| Dokumendiregister | Riigikantselei |
| Viit | 26-01081-1 |
| Registreeritud | 26.05.2026 |
| Sünkroonitud | 27.05.2026 |
| Liik | Protokolli märgitava otsuse eelnõu |
| Funktsioon | |
| Sari | 02 Vabariigi Valitsuse istungite ja nõupidamiste ettevalmistamine ja korraldamine/2-5 Vabariigi Valitsuse otsuste alusdokumendid |
| Toimik | |
| Juurdepääsupiirang | Avalik |
| Adressaat | Rahandusministeerium |
| Saabumis/saatmisviis | Rahandusministeerium |
| Vastutaja | |
| Originaal | Ava uues aknas |
Council of the European Union
Brussels, 2026
(OR. en)
Interinstitutional File:
2026/0056 (NLE)
NOTE
From: General Secretariat of the Council
ADD 1
ECOFIN UEM FIN
ECB EIB
To: Delegations
Subject: ANNEX to the COUNCIL IMPLEMENTING DECISION amending the Implementing Decision of 29 October 2021 on the approval of the assessment of the recovery and resilience plan for Estonia
6468/26 ADD 1 1
ECOFIN 1A EN
ANNEX
SECTION 1: REFORMS AND INVESTMENTS UNDER THE RECOVERY AND
RESILIENCE PLAN
1. Description of Reforms and Investments
A. COMPONENT 1: DIGITAL TRANSFORMATION OF ENTERPRISES
The objective of this component of the Estonian recovery and resilience plan is to foster the digital
transformation of Estonian companies and their competitiveness, in particular on export markets. It
shall provide financial support to companies of all sectors, with a focus on SMEs and
microenterprises, at different stages of their digital transformation, as well as specific contributions
to the adoption and deployment of digital solutions in the construction and road freight transport
sectors. Moreover, the component shall address the key issue of digital skills, through awareness-
raising of SME managers and support to the upskilling and retraining of specialists in information
and communication technologies (ICT).
Actions aimed at supporting the identification of export opportunities and the promotion of
Estonian companies abroad shall be carried out in synergy with the activities of Enterprise Estonia.
The component supports addressing the Country Specific Recommendations on investment in the
digital transition (Country Specific Recommendation 3 in 2020) and on skills shortages (Country
Specific Recommendation 2 in 2019).
It is expected that no measure in this component does significant harm to environmental objectives
within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description
of the measures and the mitigating steps set out in the recovery and resilience plan in accordance
with the‘Dono significant harm’ Technical Guidance (2021/C58/01).
A.1. Description of the reforms and investments for non-repayable financial support
1.1. Investment: Digital transformation in enterprises
The objective of the measure is to foster the digital transformation of businesses with a particular
focus on SMEs and micro-enterprises.
The measure consists in providing financial support to companies including SMEs and micro-
enterprises located in Estonia for their digital transformation.
1.2. Investment: Development of e-construction
The objective of the measure is to contribute to the acceleration of the digital transformation of the
construction sector.
The measure consists in the publication online describing the construction data classification system
and online database of average emission factors of materials; and the support to projects linked to
the use of digital construction tools by private and public entities.
6468/26 ADD 1 2
ANNEX ECOFIN 1A EN
1.3. Investment: Development of digital waybills services
The objective of the measure is to support the digitalisation of the exchange of information in road
freight transport.
The measure consists in supporting service providers in the establishment of eFTI platforms, and
enterprises to be connected to eFTI platforms.
1.4. Reform: Skills reform for the digital transformation of businesses
The objective of the reform is to increase the digital capacity of businesses and to ensure the
availability of ICT professionals.
The measure consists of the support for ICT skills for businesses.
1.5. Reform: Supporting the competitiveness of enterprises in foreign markets
The objective of the measure is to increase the export capacity and competitiveness of Estonian
companies, including notably those of the ICT sector.
The measure consists of the development of export strategies aimed at specific countries or regions;
the opening of business centres located in key export markets and the organisation of missions with
global impact groups.
6468/26 ADD 1 3
ANNEX ECOFIN 1A EN
A.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Sequential
Number
Related Measure (Reform or
Investment)
Milestone
/Target Name
Qualitative indicators (for
milestones)
Quantitative indicators (for
targets)
Indicative
timeline for
completion Description of each milestone and
target Unit of
measure
Baseline Goal Quarter Year
1 1.1 Digital
transformation in
enterprises
Milestone Call for proposals
with award criteria
and award
conditions
Publication of the
notice of the call
for proposals
Q2 2022 A call for proposals to support the digital
transformation of businesses, together with the
award criteria, shall be published by the
Ministry of Economic Affairs and
Communications.
The evaluation criteria and the conditions for
granting support shall be defined on the basis
of an analysis of the needs of Estonian
companies and the expected impact of the
measure.
Eligibility criteria shall also ensure that the
selected projects comply with the ‘Dono
significant harm’ Technical Guidance (2021/C58/01) through the use of an exclusion
list and the requirement of compliance with
the relevant EU and national environmental
legislation.
2 1.1 Digital
transformation in
enterprises
Target Award of grants Number of
enterprises
being
awarded a
grant
0 110 Q4 2023 Number of enterprises to which grants shall be
awarded by the Ministry of Economic Affairs
and Communications to support their digital
transformation in accordance with the call for
proposals.
3 1.1 Digital
transformation in
enterprises
Target Award of grants Number of
grant award
decisions
110 230 Q4 2025 Number of grant award decisions done by EIS,
Estonian Business and Innovation Agency,
following the call for proposals under
milestone 1.
6468/26 ADD 1 4
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure (Reform or
Investment)
Milestone
/Target Name
Qualitative indicators (for
milestones)
Quantitative indicators (for
targets)
Indicative
timeline for
completion Description of each milestone and
target Unit of
measure
Baseline Goal Quarter Year
4 1.2 Development
of e-construction
Milestone Introduction of a
construction data
classification system
Publication of
guidelines and
online database
Q4 2024 Published guidelines shall describe the
construction data classification system. A
database of average emission factors of
materials shall be available online.
Building permits and design specifications,
and building registry (logbook) shall be
accessible from the e-construction platform.
6 1.2 Development
of e-construction
Target Projects for digital
construction tools
Number of
confirmations
from
authorities
accepting the
final reports
0 102 Q4 2025 At least 102 confirmations by the authorities
accepting the final project implementation
report for projects on digital construction tools
of private and public entities, selected through
an open call for proposals
7 1.3 Development of digital waybills
services
Target eFTI (electronic
Freight Transport
Information)
platforms
development
Number of
projects
launched
0 5 Q2 2023 Number of projects developing an eFTI
platform which have received a positive grant
decision.
9 1.3 Development of digital waybills
services
Target Confirmations from
authorities accepting
the final reports
Number of
confirmations
from
authorities
accepting the
final reports
0 205 Q1 2026 At least 205 confirmations by the authorities
accepting the final project implementation
reports for projects on digital waybills.
6468/26 ADD 1 5
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure (Reform or
Investment)
Milestone
/Target Name
Qualitative indicators (for
milestones)
Quantitative indicators (for
targets)
Indicative
timeline for
completion Description of each milestone and
target Unit of
measure
Baseline Goal Quarter Year
11 1.4 Skills reform
for the digital
transformation of
businesses
Milestone Entry into force of
secondary legislation
setting out the terms
of support for the
development of
digital skills
Entry into force of secondary
legislation
Q2 2022 The secondary legislation necessary for the
application and allocation of support shall
enter into force. The conditions for support
shall be established through a ministerial
decree, which shall be coordinated with the
Ministry of Finance and the State Shared
Service Centre.
The ministerial decree shall consist of the
following elements:
- objective of the measure,
- description of supported activities,
- beneficiaries and target groups,
- conditions for implementation, eligible
costs and used simplifications,
- conditions for payments,
- conditions for reporting and
monitoring.
12 1.4 Skills reform
for the digital
transformation of
businesses
Target Enrolment in
training activities
Number of
participants
0 500 Q4 2023 Number of people enrolled in training
activities supported under this measure,
consisting of awareness-raising for SME
managers, and upskilling and retraining for
ICT specialists. A minimum of 35% of
participants enrolled in these training activities
shall be women.
13 1.4 Skills reform
for the digital
transformation of
businesses
Target The participation
in training
activities
Number of
confirmed
participatio
ns
0 1818 Q2 2026 Number of confirmed participations in training activities supported under this measure.
6468/26 ADD 1 6
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure (Reform or
Investment)
Milestone
/Target Name
Qualitative indicators (for
milestones)
Quantitative indicators (for
targets)
Indicative
timeline for
completion Description of each milestone and
target Unit of
measure
Baseline Goal Quarter Year
14 1.4 Skills reform
for the digital
transformation of
businesses
Target Number of
curriculums of
training registered and
qualification
standards for ICT
specialists registered
Number of
curriculums
registered
and
qualification
standards
registered
0 10 Q4 2024 Five curriculums of training shall be registered
in Estonia’s Adult training information system
(JUHAN). Five new or updated qualification standards
for ICT specialists shall be registered in the
national register of qualification standards.
16 1.5 Supporting the
competitiveness of
enterprises in
foreign markets
Milestone Preparation of the
development of
strategies
Completion of
preparatory tasks
Q2 2022 The preparatory tasks needed to draw up
export strategies shall be completed.
These tasks include:
- an analysis of which external markets
are important to develop strategies,
- an analysis of the interests of
businesses,
- a mapping of the needs of exporting
enterprises to increase their competitiveness
on export markets, the ranking of the needs.
17 1.5 Supporting the
competitiveness of
enterprises in
foreign markets
Milestone Procurement of
studies
Signature of
contracts
Q2 2024 Tenders for drawing up strategies and product
packages with a view to obtaining detailed
market information on foreign markets shall be carried out by the Ministry of Foreign Affairs.
The corresponding contracts shall be signed.
18 1.5 Supporting the
competitiveness of
enterprises in
foreign markets
Target Strategies published
and missions carried
out
Number of
strategies
published and
missions
carried out
0 27 Q2 2026 At least 13 national and/or regional export
strategies shall be published and at least 14
missions carried out.
6468/26 ADD 1 7
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure (Reform or
Investment)
Milestone
/Target Name
Qualitative indicators (for
milestones)
Quantitative indicators (for
targets)
Indicative
timeline for
completion Description of each milestone and
target Unit of
measure
Baseline Goal Quarter Year
19 1.5 Supporting the
competitiveness of
enterprises in
foreign markets
Milestone Preparatory analysis
to define the content
and the locations of
business centres
Delivery of a
preparatory
analysis
Q2 2022 A preparatory analysis allowing the definition of the content and the locations of the business
centres shall be prepared by the Ministry of
Foreign Affairs. The analysis shall reveal
where to set up business centres to increase
demand for Estonian-made products and
services in export markets.
20 1.5 Supporting the
competitiveness of
enterprises in
foreign markets
Target Number of business
centres opened
Number of
business
centres
0 7 Q2 2026 Number of business centres opened in foreign countries that are important export markets.
21 1.5 Supporting the
competitiveness of
enterprises in
foreign markets
Milestone Setting-up of impact
groups and selection
of destinations for
global digital
missions
Decisions on the
composition of the
impact groups and
the destinations of
the global digital
missions
Q2 2022 Based on an analysis, the Ministry of Foreign
Affairs shall select global digital mission
destinations and impact groups to increase the
added value of Estonian digital services
exports, increase the export capacity of
Estonian companies, among which ICT
companies in particular, and attract additional
foreign investments for innovation.
6468/26 ADD 1 8
ANNEX ECOFIN 1A EN
B. COMPONENT 2: ACCELERATING THE GREEN TRANSITION IN ENTERPRISES
B.1. Description of the reforms and investments for non-repayable financial support
The objective of the component of the Estonian recovery and resilience plan is to speed up the
green transition in the business sector in Estonia and to seize the business opportunities it
represents. The component consists of two reforms and six investments and aims to support the
development of green technologies, increase green R&D and innovation capabilities and resource
efficiency, introduce new business models and improve skills and expertise in fields related to the
green transition. The measures under this component aim for a comprehensive approach to the
green transition addressing key market failures and facilitating the technological and behavioural
breakthrough to increase the competitiveness of the business sector. The measures also support
further development of the capital market and business environment.
The component supports addressing the Country Specific Recommendations on supporting the
innovation capacity of small and medium-sized enterprises and focussing investment on the green
transition, ensuring sufficient access to finance (Country Specific Recommendation 3 in 2020), on
skills shortages (Country Specific Recommendation 2 in 2019) and reducing reliance on fossil fuels
(Country Specific Recommendation 4 in 2022).
It is expected that no measure in this component does significant harm to environmental objectives
within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description
of the measures and the mitigating steps set out in the recovery and resilience plan in accordance
with the‘Dono significant harm’ Technical Guidance (2021/C58/01).
2.1. Reform: Green transition of enterprises
The objective of the reform is to improve the green transition in the business sector, which is
expected to have economic, environmental and social benefits by making existing businesses more
efficient and environmentally friendly (resource efficiency, new green transition certificates and
market authorisations for products) and by supporting the emergence of new green technology
companies (development and deployment of green technologies, new opportunities for the
valorisation of bio-resources).
The reform shall consist of the set-up of a broad-based Green Transition Task Force to foster
cooperation between the green technology stakeholders and the adoption of legislation necessary
for the implementation of the five complementary investments: 1. Green skills to support the green
transition of companies; 2. Green technology development programmes; 3 Modernisation of the
business models in manufacturing companies; 4. Resource efficient green technologies; and 5.
Green Fund.
The reform is interlinked with Component 1 as digitalisation and automation are contributing to the
development of green technologies and green transition in the business sector.
The implementation of the reform shall be completed by 31 December 2022.
2.2. Investment: Green skills to support the green transition of enterprises
The objective of the investment is to ensure the availability of skilled adults for the green transition
in enterprises.
6468/26 ADD 1 9
ANNEX ECOFIN 1A EN
The investment consists of the introduction of green skills upskilling and retraining programmes for
adults.
2.3. Investment: Green technologies development programme
The objective of the investment is to contribute to the green transition of companies.
The investment consists of support to start-ups and development clusters with a focus on integrated
green technology solutions through various services.
2.4. Investment: Modernisation of the business models in manufacturing companies
The objective of the investment is to support the change of business models in manufacturing to
facilitate the compliance of Estonian products with environmental and climate objectives.
The measure consists of support to projects modernising the business models of manufacturing
companies related to climate and environmental objectives.
2.5. Investment: Resource-efficient green technologies
The objective of the investment is to support the resource efficiency of companies, including energy
efficiency, with a particular focus on the valorisation of underutilised bio-resources.
The measure consists of support to projects for resource-efficient green technologies; and for the
valorisation of bio-resources.
2.6. Investment: Green Fund
The objective of the investment is to provide capital for the development of new green technologies in
strategic areas such as energy, agriculture, food industry, transport and logistics, materials and
chemical industries. The Green Fund shall provide funding for companies and sectors whose
products, services or processes are characterised by research-intensive green technologies and
whose activities contribute to solving environmental problems, developing new products, services
or technologies that reduce or capture greenhouse gas emissions or are driven by eco-design
requirements.
The measure aims to be implemented as a financial instrument. The Green Fund shall consist of a
public investment in a Facility, the SmartCap Green Fund, in order to incentivise private investment
and improve access to finance in Republic of Estonia. On the basis of the RRF investment, the
Facility aims at initially providing at least EUR 90 million of financing.
The Facility shall be managed by AS SmartCap as the implementing partner. The Facility shall
include the following product lines:
• direct equity investments in early to expansion stage (including late growth and maturity
stage and infrastructure) innovative and/or research-intensive green technology companies by
acquiring equity instruments, in particular new ordinary or preferred shares of a private
or public limited company or other equivalent rights that represent a holding issued by the
target undertaking;
• investments in investment funds that make equity investments that focus on: a) initial or
seed phase investments to ensure market activation and the generation of transaction flows
based on new technologies through business accelerators and intensive programs for the
development of innovative and/or research-intensive companies; b) early-stage investments
6468/26 ADD 1 10
ANNEX ECOFIN 1A EN
to finance the market introduction of new technologies; and/or early growth or expansion
stage (including late growth and maturity stage and infrastructure) investments to finance
the rapid growth and expansion of companies on the market, including international
expansion and export of products, services or technology.
In order to implement the investment into the Facility, the Estonian Ministry of Economic Affairs
and Communication and AS SmartCap shall sign an Implementing Agreement that shall include the
following content:
1. Description of the decision-making process of the Facility: The final investment decision of the Facility shall be taken by an investment committee or other relevant equivalent
governing body and approved by a majority of votes from members who are independent
from the government.
2. Key requirements of the associated investment policy shall be specified:
a. The description of the financial product(s) and eligible final beneficiaries.
b. The requirement that all investments supported are economically viable.
c. The requirement to comply with t h e ‘ Do no significant harm’ Technical Guidance
(2021/C58/01). The legal agreement signed between Estonia and SmartCap and the
subsequent investment policy of the Green Fund shall:
i. require the application of the Commission’s technical guidance on
sustainability proofing for the InvestEU Fund; and
ii. require companies that derived more than 50% of their revenues during the
preceding financial year from the following activities and/or assets to adopt
and publish green transition plans: (i) activities and assets related to fossil
fuels, including downstream use1; (ii) activities and assets under the EU
Emission Trading System (ETS) achieving projected greenhouse gas
emissions that are not lower than the relevant benchmarks2; (iii) activities and
assets related to waste landfills, incinerators3 and mechanical biological
treatment plants4; and (iv) activities and assets where the long-term disposal
of waste may cause harm to the environment; and
iii. require the verification of legal compliance with the relevant EU and national
environmental legislation of the beneficiary by SmartCap for all transactions,
including those exempted from sustainability proofing.
1 Except projects under this measure in power and/or heat generation, as well as related transmission and distribution
infrastructure, using natural gas, that are compliant with the conditions set out in Annex III of the‘Dono significant
harm’ Technical Guidance (2021/C58/01). 2 Where the activity supported achieves projected greenhouse gas emissions that are not significantly lower than the
relevant benchmarks an explanation of the reasons why this is not possible should be provided. Benchmarks
established for free allocation for activities falling within the scope of the Emissions Trading System, as set out in
the Commission Implementing Regulation (EU) 2021/447. 3 This exclusion does not apply to actions under this measure in plants exclusively dedicated to treating non-
recyclable hazardous waste, and to existing plants, where the actions under this measure are for the purpose of
increasing energy efficiency, capturing exhaust gases for storage or use or recovering materials from incineration
ashes, provided such actions under this measure do not result in an increase of the plants’ waste processing capacity
or in an extension of the lifetime of the plants; for which evidence is provided at plant level. 4 This exclusion does not apply to actions under this measure in existing mechanical biological treatment plants,
where the actions under this measure are for the purpose of increasing energy efficiency or retrofitting to recycling
operations of separated waste to compost bio-waste and anaerobic digestion of bio-waste, provided such actions
under this measure do not result in an increase of the plants’ waste processing capacity or in an extension of the
lifetime of the plants; for which evidence is provided at plant level.
6468/26 ADD 1 11
ANNEX ECOFIN 1A EN
3. Monitoring, audit, and control requirements, including:
1. The description of the SmartCap monitoring system to report on the investment
mobilized.
2. The description of the SmartCap procedures that will ensure the prevention,
detection and correction of fraud, corruption, and conflicts of interests.
3. The obligation to verify the eligibility of every operation in accordance with the
requirements laid out in the Implementing Agreement before committing to finance
an operation.
4. The obligation of carrying out risk-based ex-post audits in accordance with an audit
plan of the AS SmartCap. These audits shall verify i) that the control systems are
effective, including the detection of fraud, corruption, and conflict of interests; ii)
compliance with the DNSH principle, the State Aid rules, the climate target
requirements;
The audits shall also verify the legality of the transactions and that the conditions of
the applicable Implementing Agreement and Funding Agreements are being
respected
4. Requirements for selecting financial intermediaries: AS SmartCap shall select
financial intermediaries in an open, transparent, and non-discriminatory manner. Controls
for the absence of conflict of interests on financial intermediaries shall take place and be
conducted ex-ante for all financial actors involved.
5. Requirement to sign Funding Agreements: AS SmartCap shall sign Funding
Agreements with the financial intermediaries in line with key requirements that shall be
provided as an annex of the Implementing Agreement. The key requirements of the Funding
Agreement shall include all the requirements under which the Facility operates, including:
1. The obligation of the financial intermediary to take its decisions in
compliance mutatis mutandis with the decision making and investment policy
requirements specified above, including related to respect of the DNSH
principle.
2. The description of the monitoring and audit and control framework that the
financial intermediary shall put in place, which mutatis mutandis shall be
subject to all the monitoring, audit and control requirements specified above.
2.7. Investment: Creating opportunities for the uptake of renewables-based green hydrogen
technologies
The objective of the investment is to support the 1st phase of the launch and piloting of hydrogen
integrated value chains from energy production and supply solutions to final consumption in
different application areas.
The measure consists of support for projects in renewable-based green hydrogen technologies.
6468/26 ADD 1 12
ANNEX ECOFIN 1A EN
2.8. Investment: Supply Security Investment Support
The objective of the investment is to support the transition of companies from fossil energy sources
to alternative energy supply sources.
The measure consists of support to investment projects for the transition of companies from fossil
energy sources to alternative energy supply.
6468/26 ADD 1 13
ANNEX ECOFIN 1A EN
B.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Sequential
Number
Related Measure (Reform or Investment)
Milestone
/Target Name
Qualitative
indicators (for Unit of
measure
Quantitative
indicators
(for targets)
Indicative timeline
for completion Description of each milestone and
target
milestones) Baseli ne
Goal Quarter Year 23 2.1 Green
transition of
enterprises
Milestone Creation of a Green
Transition Task Force
to implement and
monitor the green
transition
Set up of a task
force and
working groups
Q4 2021 The Ministry of the Environment shall
reform the existing Working Group on
Green Technology (set up in 2020) into
the RRP’s Green Transition Task Force
to coordinate the measures on the green
transition of companies and improve
cooperation and exchange of
information among the public sector,
stakeholders and interest groups. The
necessary working groups shall be set up
for specific measures.
24 2.1 Green
transition of
enterprises
Milestone Adoption of the
Circular Economy
Action Plan by the
Green Transition Task
Force
Circular
Economy Action
Plan adopted
Q4 2022 The Green Transition Task Force shall
review the existing Circular Economy
activities and different action plans into
a single Circular Economy Action Plan
that will lead the Estonian transition to
Circular Economy.
25 2.2 Green skills to
support the green
transition of
enterprises
Milestone Entry into force of
secondary legislation
setting out the terms of
support for the
development of green
skills
Entry into force of secondary
legislation
Q2 2022 The secondary legislation necessary for
the application and allocation of
support shall enter into force. It shall
contain provisions ensuring that any
action supported under this measure is
focused on areas contributing to the
reduction of greenhouse gas emissions
or the adaptation to climate change.
27 2.2 Green skills to
support the green
transition of
enterprises
Target Confirmed participati
ons
Number of
confirmed
participations
0 2 830 Q2 2026 Number of confirmed participations in
training activities supported under this
measure.
6468/26 ADD 1 14
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure (Reform or Investment)
Milestone
/Target Name
Qualitative
indicators (for Unit of
measure
Quantitative
indicators (for
targets)
Indicative timeline
for completion Description of each milestone and
target
milestones) Baseline Goal Quarter Year 28 2.3 Green
technologies
development
programme
Milestone Establishment of a
working group to plan
and set up the
development
programme
Recruitment of a
project manager
and set up of a
working group
Q4 2021 A project manager shall be recruited
and a broad-based group of
stakeholders shall be set up to
coordinate investment planning and
implementation. The role of the project
manager shall be set out to gather
information from market participants and
design the necessary support measures
and procurement. The working group
shall be composed of parties involved in
the development of entrepreneurship
and shall undertake to meet at least three
times a year to take stock of
developments in investment- related
activities and provide
recommendations for further action.
The working group shall draw up
provisions related to the selection of
actions to be supported under the
development programme in such a way
that it is ensured that each action
directly contributes either to lowering
greenhouse gas emissions or supporting
adaptation to climate change.
6468/26 ADD 1 15
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure (Reform or Investment)
Milestone
/Target Name
Qualitative
indicators (for Unit of
measure
Quantitative
indicators (for
targets)
Indicative timeline
for completion Description of each milestone and
target
milestones) Baseline Goal Quarter Year 29 2.3 Green
technologies
development
programme
Milestone Set up of the Green
Technologies
Development
Programme
Contracts signed
for all
development
clusters and
support measures
designed and
opened
Q2 2024 The public procurement processes for at
least 5 development clusters shall be
completed and the contracts shall be
awarded to the winning parties.
Support measures shall be designed and
their first rounds shall be opened to at
least 10 start-ups.
The selection processes shall ensure
that each supported action directly
contributes either to lowering
greenhouse gas emissions or supporting
adaptation to climate change.
31 2.3 Green
technologies
development
programme
Target Number of clusters and startups supported
through the Green
Technology
Development
Programme
Number of
clusters and
startups
supported
0 15 Q2 2026 Confirmations by the authorities accepting the final report for at least 5 clusters and at least 10 start-ups from the development programme.
6468/26 ADD 1 16
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure (Reform or Investment)
Milestone
/Target Name
Qualitative
indicators (for Unit of
measure
Quantitative
indicators (for
targets)
Indicative timeline
for completion Description of each milestone and
target
milestones) Baseline Goal Quarter Year 32 2.4 Modernisation
of the business
models in
manufacturing
companies
Milestone Entry into force of the
ministerial decree
setting out the terms
and conditions of grant
eligibility
Entry into force of the ministerial
decree
Q2 2022 The conditions for granting support
shall be enacted by a decree of the
responsible minister. The requirements
set shall include eligibility criteria to
ensure that the selected projects comply
with the ‘Dono significant
harm’Technical Guidance (2021/C58/01)
by means of an exclusion list and
compliance with relevant EU and
national environmental legislation. The
selection/eligibility criteria shall
specify that the supported activities
and/or enterprises contribute to a
climate-neutral economy, resilience and
climate change adaptation including
circular economy objectives such as in-
house implementation of circular
economy principles, transfer of
transport and storage of companies to
new foundations.
33 2.4 Modernisation of the business
models in
manufacturing
companies
Target Confirmations by
authorities accepting
the final project
reports
Number of
confirmations
by authorities
accepting the
final project
reports
0 70 Q2 2026 At least 70 confirmations by the
authorities accepting the final project
implementation reports following the
call for proposals from milestone 32.
6468/26 ADD 1 17
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure (Reform or Investment)
Milestone
/Target Name
Qualitative
indicators (for Unit of
measure
Quantitative
indicators (for
targets)
Indicative timeline
for completion Description of each milestone and
target
milestones) Baseline Goal Quarter Year 34 2.5 Resource
efficient green
technologies
Milestone Publication of call for
proposals for grants
Publication of the
notice for calls
for proposals for
grants
Q2 2022 Call for proposals to support resource-
efficient green technologies and the
valorisation of bio-resources shall be
published and open for applications,
including eligibility criteria to ensure that
the selected projects comply with
the‘Dono significant harm’ Technical
Guidance (2021/C58/01) by means of an
exclusion list and compliance with
relevant EU and national environmental
legislation. The selection/eligibility
criteria shall specify that the supported
activities and/or enterprises contribute
to a climate-neutral economy, resilience
and climate change adaptation
35 2.5 Resource
efficient green
technologies
Target Number of projects
awarded grants
following the call for
proposals
Number of
projects
0 36 Q4 2023 Award of grants to 36 projects selected
under the competitive call for
proposals, for green technologies for
industrial plants and for valorisation of
bioresources, in compliance with the terms
of reference.
36 2.5 Resource
efficient green
technologies
Target Confirmations from
authorities accepting
the final reports
Number of
confirmations
from
authorities
accepting the
final reports
0 36 Q2 2026 At least 36 confirmations from the
authorities accepting the final project
implementation reports following the
call for proposals from milestone 34.
6468/26 ADD 1 18
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure (Reform or Investment)
Milestone
/Target Name
Qualitative
indicators (for Unit of
measure
Quantitative
indicators (for
targets)
Indicative timeline
for completion Description of each milestone and
target
milestones) Baseline Goal Quarter Year 37 2.6 Green Fund Milestone Signature of
contractual agreement
between the Ministry
of Economic Affairs
and Communications
and SmartCap
Signature of
contractual
agreement
Q4 2021 A contractual agreement shall be signed
between the Ministry of Economic
Affairs and Communications and
SmartCap to manage the Green Fund,
which shall contain:
- Investment objectives to invest in enterprises and activities contributing to a climate-neutral
economy and to improving resilience to
climate change, including awareness-
raising measures,
- Eligibility criteria for
compliance with the‘Dono significant
harm’ Technical Guidance
(2021/C58/01) of supported
beneficiaries through the use of
sustainability proofing, an exclusion list and the requirement of compliance with
the relevant EU and national environmental legislation.
6468/26 ADD 1 19
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure (Reform or Investment)
Milestone
/Target Name
Qualitative
indicators (for Unit of
measure
Quantitative
indicators (for
targets)
Indicative timeline
for completion Description of each milestone and
target
milestones) Baseline Goal Quarter Year 38 2.6 Green Fund Milestone Adoption of the
investment policy
document by
SmartCap
Investment
policy document
adopted by
SmartCap
Q4 2021 SmartCap shall adopt the investment
policy for the Green Fund, in line with
the contractual agreement signed
between the Ministry of Economic
Affairs and Communications and
SmartCap, including the investment
objectives and the eligibility criteria to
ensure compliance with the ‘Dono
significant harm’ Technical Guidance (2021/C58/01) of supported
beneficiaries under this measure
through the use of sustainability
proofing, the requirement of compliance
with the relevant EU and national
environmental legislation, and the
requirement for beneficiaries that
derived more than 50% of their
revenues during the preceding financial
year from activities or assets in the
exclusion list to adopt and publish
green transition plans.
39a 2.6 Green Fund Milestone Completion of the
investment by the
Ministry of Economic
Affairs and
Communication
Transfer Q3 2025 Estonia shall transfer EUR 100 million
to AS SmartCap for the Facility. The
transfer shall be conditional upon the
inclusion of the requirements of the
measure description in the relevant
contractual agreements.
40a 2.6 Green Fund Target Legal financing
agreements signed
with equity/venture
capital funds
Percentage
(%)
0 100 Q2 2026 AS SmartCap shall have entered into
legal financing agreements with equity
investments /venture capital funds for an
amount necessary to use 100% of the
RRF investment into the Facility
(taking into account operational
expenditures).
6468/26 ADD 1 20
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure (Reform or Investment)
Milestone
/Target Name
Qualitative
indicators (for Unit of
measure
Quantitative
indicators (for
targets)
Indicative timeline
for completion Description of each milestone and
target
milestones) Baseline Goal Quarter Year 41 2.7 Creating
opportunities for
the uptake of
renewables-based
green hydrogen
technologies
Milestone Entry into force of the
ministerial decree
setting out the terms and
conditions for
granting support
Entry into force of the ministerial
decree
Q4 2022 Development of project selection
criteria, and entry into force of the
ministerial decree on the conditions for
granting support for projects related to
integrated green hydrogen
technologies. The terms of reference for
this support shall include eligibility
criteria that ensure that the objectives
of the selected projects comply with
the‘Dono significant harm’ Technical
Guidance (2021/C58/01) through the
use of an exclusion list and the
requirement of compliance with the
relevant EU and national environmental
legislation.
43 2.7 Creating opportunities for
the uptake of
renewables-based
green hydrogen
technologies
Target Grant agreements
signed for projects in
renewables-based
green hydrogen
technologies
EUR 0 11 550 000 Q3 2025 Grant agreements signed for projects in
renewables-based green hydrogen
technologies under this measure,
representing at least EUR 11 million
6468/26 ADD 1 21
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure (Reform or Investment)
Milestone
/Target Name
Qualitative
indicators (for Unit of
measure
Quantitative
indicators (for
targets)
Indicative timeline
for completion Description of each milestone and
target
milestones) Baseline Goal Quarter Year 43a 2.8 Supply security
investment support
Milestone Publication of the call
for proposals for
grants
Publication of the
notice for call for
proposals for
grants
Q4 2023 A call for proposals to support
investment projects for the transition of
companies from fossil energy sources
to alternative energy supply sources
shall be published and open for
applications, including eligibility
criteria to ensure that the selected
projects comply with the ‘Dono
significant harm’ Technical Guidance (2021/C58/01) by means of
requirements related to supported
eligible alternative energy sources and
supported activities as set out in the
measure description and compliance
with relevant EU and national
environmental legislation.
43c 2.8 Supply security
investment support
Target Confirmations from
authorities accepting
the final reports
Number of
confirmations
from
authorities
accepting the
final reports
0 70 Q2 2026 At least 70 confirmations from the
authorities accepting the final project
implementation reports following the
call for proposals from milestone 43a.
6468/26 ADD 1 22
ANNEX ECOFIN 1A EN
C. COMPONENT 3: DIGITAL STATE
Building on the successful deployment of digital technologies for the delivery of public services in
Estonia over the last years, this component of the Estonian recovery and resilience plan aims at
upgrading the digital government services further, in particular in terms of user-centricity and
resilience (including in light of the growing cybersecurity threats). The component features
measures allowing to take advantage of the opportunities offered by the latest technologies,
especially artificial intelligence, but also significant redesigns of both front-end and back-end
services. They shall benefit both citizens and businesses. Specific actions are foreseen in order to
reinforce the country’s capacities to combat money laundering. The support to the deployment of
very high capacity networks in rural areas is also expected to ensure wider access to online services
and, more generally, contribute to the further digital transformation of the country.
The component supports addressing the Country Specific Recommendations on investment in the
digital transition (Country Specific Recommendation 3 in 2020) and on the anti-money laundering
framework (Country Specific Recommendation 1 in 2019 and Country Specific Recommendation 4
in 2020).
It is expected that no measure in this component does significant harm to environmental objectives
within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description
of the measures and the mitigating steps set out in the recovery and resilience plan in accordance
with the‘Dono significant harm’ Technical Guidance (2021/C58/01).
C.1. Description of the reforms and investments for non-repayable financial support
3.1. Reform: Creation and development of a centre of excellence for data governance and
open data
The objective of the measure is to foster a better management of the data collected and held by the
Estonian public authorities.
The measure consists of the creation of a data management team within Statistics Estonia; and
publication of datasets.
3.2. Reform: Development of event services for individuals
The objective of the measure is to support the efficiency of the delivery of public services and
reduce the administrative burden for citizens.
The measure consists of providing life event services for citizens online.
3.3. Reform: Development of event services and digital gateway for entrepreneurs
The objectives of the measure are to support the efficiency and the quality of the delivery of public
services and reduce the administrative burden for entrepreneurs.
The measure consists of IT developments related to the business event services and/or gateway for
entrepreneurs.
3.4. Investment: #Bürokratt programme (national virtual assistant)
The objective of the measure is to support the user-friendliness and accessibility of public services
6468/26 ADD 1 23
ANNEX ECOFIN 1A EN
in Estonia.
The measure consists of developing a virtual assistant for the access to online public services which
builds on pilot projects carried out in 2020 and 2021.
3.5. Investment: Reconfiguration of basic digital services and safe transition to cloud
infrastructure
The objective of the measure is to increase the resilience, the security and the reliability of the IT
systems and services of the Estonian public authorities.
The measure consists of:
- the creation of a new public body in charge of the central management of the IT basic services
and infrastructures of public institutions,
- the procurement of private cloud infrastructure resources,
- the migration of existing information systems to the private cloud,
- the testing of information systems used by public authorities by the Estonian Information
System Authority (RIA),
- the extension of the private cloud to the data embassy.
3.6. Reform: The strategic analysis of money laundering and terrorist financing in Estonia
The objective of the reform is to increase the capacity of the Financial Intelligence Unit to identify
money laundering schemes and channels at an early stage.
The measure consists of establishing a Centre for Strategic Analysis within the Financial
Intelligence Unit.
3.7. Investment: Information system for strategic analysis of money laundering and terrorist
financing
The objective of the measure is to enable the exploitation of data available from different authorities
and the identification of possible money laundering schemes and channels.
The measure consists of developing an IT system.
3.8. Investment: Construction of very high capacity broadband networks
The objective of the investment is to support the access to very high capacity broadband networks
(VHCN), which offer a connection of at least 100 Mbps.
The measure consists of providing financial support to projects for the construction of very high
capacity broadband networks.
6468/26 ADD 1 24
ANNEX ECOFIN 1A EN
C.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for
targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
44 3.1 Creation and
development of a centre
of excellence for data
governance and open
data
Milestone Setting up a data
management team
in the Statistical
Office, the
Ministry of
Economic Affairs
and
Communications
and the State
Information
System Authority
Establishment of the
necessary
organisational
structure for
coordinating data
management
Q4 2021 Creation of a Data Management
Team in Statistics Estonia through the
recruitment of expert staff tasked
with coordinating the data
governance framework and
supporting other public authorities. In
addition, posts shall be created at the
Ministry of Economic Affairs and
Communications and at the State
Information System Agency
to carry out development projects.
By the end of 2021, at least five
people shall be recruited across the
three entities.
46 3.1 Creation and
development of a centre
of excellence for data
governance and open
data
Target Publication of
datasets
Number of
published
datasets
706 2 600 Q4 2025 The number of datasets published
shall be increased from 706 on 13
August 2021 to 2 600.
6468/26 ADD 1 25
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for
targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
47 3.2 Development of
event services for
individuals
Target Launch of personal
life event services
and/or proactive
services
Number of
services
which are
operational
0 2 Q4 2022 Number of citizen life event
services and/or proactive services
launched online.
The corresponding IT solutions
enabling the provision of the
services shall be operational at least
in the basic parts of a given service
and are subject to a further
development during the
implementation of the measure.
The selection of concerned services
shall be based on the development
plan for personal life event and
proactive services.
48 3.2 Development of
event services for
individuals
Target Online personal life
event services
Number of
services
online
2 10 Q4 2025 Number of citizen life event
services online, providing at least
the basic parts of a given service.
6468/26 ADD 1 26
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for
targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
49 3.3 Development of
event services and
digital gateway for
entrepreneurs
Target Deployment of IT
developments
contributing to the
implementation of
the business event
services and
gateway
Number of
projects that
have
successfully
deployed new
developments
online
0 1 Q4 2022 Number of IT development projects
contributing to the implementation
of the business event services and
gateway that have successfully
deployed new developments online.
These development projects shall be
either directly related to the
development of the digital gateway
for entrepreneurs or to the
development of business-event
services, which additionally include
the development of various related
systems for interfacing with the
digital gateway. As a result of each
development project, at least a
minimally functional IT solution
shall be completed (i.e., the IT
solution shall be operational at least
in the basic parts for the end users
(entrepreneurs) and shall be able to
provide feedback for further
development needs during the
reform implementation period or
afterwards).
50 3.3 Development of
event services and
digital gateway for
entrepreneurs
Target IT developments
online
Number of IT
developments
online
1 10 Q4 2025 Number of IT developments related
to the business event services and/or
gateway that are available online.
6468/26 ADD 1 27
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for
targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
51 3.4 #Bürokratt
programme (national
virtual)
Target Access to digital
public services
through the virtual
assistant platform
Number of
public digital
services
accessible
through the
virtual
assistant
0 1 Q2 2022 Number of digital public services
available through the platform of
the virtual assistant.
52 3.4 #Bürokratt
programme (national
virtual)
Target Bürokratt virtual
assistant on public
authorities’website
s
Number of
websites
0 18 Q4 2025 Number of public authority
websites in which the virtual
assistant provides services.
54 3.5 Reconfiguration of
basic digital services and
safe transition to cloud
infrastructure
Milestone Development of
centrally
delivered/shared IT
base services
Opening of shared server hosting and computer
workstation services
to public authorities
Q3 2022 Basic IT services provided/shared
centrally shall open for subscription
by new users (ministries and other
authorities).
55 3.5 Reconfiguration of
basic digital services and
safe transition to cloud
infrastructure
Target Deployment of
national private
cloud
infrastructure by
public authorities
Number of
information
systems
migrated to
the national
private cloud
0 10 Q4 2023 Number of information systems for
which the migration to the private
cloud infrastructure shall be
completed.
56 3.5 Reconfiguration of
basic digital services and
safe transition to cloud
infrastructure
Milestone Extension of the
cloud
infrastructure to
the data embassy
Completion of the
extension of the
national private
cloud to the
infrastructure of
Estonia’s data
embassy
Q4 2023 It shall become possible to host and operate information systems
migrated to the private cloud from
the data embassy. New hardware and
licenses shall be acquired and set
up for this purpose.
6468/26 ADD 1 28
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for
targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
58 3.5 Reconfiguration of
basic digital services and
safe transition to cloud
infrastructure
Target Security testing by
the Information
System Authority
Number of
tests
0 16 Q4 2024 Number of security tests carried out
by the Information System
Authority.
The test results shall be summarised
in security testing reports.
59 3.6 The strategic
analysis of money
laundering and terrorist
financing in Estonia
Milestone Entry into force of
legal act(s)
Entry into force of
legal act(s)
Q4 2024 Legal act(s) shall have entered into force to allow the Centre for
Strategic Analysis to access and
process data relevant to the detection and prevention of money
laundering and terrorist financing:
(1) the statute of the Financial
Intelligence Unit shall enter into
force establishing the Centre for
Strategic Analysis.
(2) an amendment of the Money
Laundering and Terrorist Financing
Prevention Act shall enter into
force.
60 3.7 Information system
for strategic analysis of
money laundering and
terrorist financing
Milestone ICT system for
strategic analysis
ICT system available
for use by the
Financial
Intelligence Unit
Q2 2026 The ICT system for strategic
analysis of money laundering shall be
available for use by the Financial
Intelligence Unit.
6468/26 ADD 1 29
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for
targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
62 3.8 Construction of very
high capacity broadband
networks
Target Number of very
high capacity
broadband network
projects confirmed
Number of
projects
0 100 Q4 2025 Number of projects confirmed by
the Consumer Protection and
Technical Regulatory Authority
(TTJA) to be respecting the
requirements of the ministerial
Regulation on the conditions and
procedure for the support measure
for the construction of a VHCN.
The ministerial Regulation shall
define the VHCN using the end
users' download speed of at least
100 Mbps.
6468/26 ADD 1 30
ANNEX ECOFIN 1A EN
D. COMPONENT 4: ENERGY AND ENERGY EFFICIENCY
This component of the Estonian recovery and resilience plan addresses the challenge of
decarbonising the energy sector. The objectives of the component are to reduce the dependency on
oil shale, incentivise uptake of renewable energy and improve the energy efficiency of buildings.
The component supports addressing the Country Specific Recommendation to focus investments on
energy infrastructure and on resource and energy efficiency, contributing to the progressive
decarbonisation of the economy (Country Specific Recommendation 3 in 2019 and in 2020).
Upgraded and new measures support addressing the Country Specific Recommendation on reducing
reliance on fossil fuels through facilitating the deployment of renewable energy sources and
increasing energy efficiency (Country Specific Recommendation 4 in 2022).
It is expected that no measure in this component does significant harm to environmental objectives
within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description
of the measures and the mitigating steps set out in the recovery and resilience plan in accordance
with the‘Dono significant harm’ Technical Guidance (2021/C58/01).
D.1. Description of the reforms and investments for non-repayable financial support
4.1. Reform: Energy efficiency promotion
The objective of the reform is to reduce the administrative barriers to energy efficient renovations.
The measure consists of setting up a regional advisory network and training of technical consultants
in order to provide the necessary information and incentivise renovations.
4.2. Investment: Support for the renovation of multi-apartment buildings
The objective of the measure is to boost renovations of multi-apartment buildings in order to
increase energy efficiency.
The measure consists of support for energy efficiency renovations of multi-apartment buildings
achieving an average level of primary energy savings of at least 30%.
4.3. Investment: Support for the renovation of small residential buildings
The objective of the measure is to boost renovations of small residential buildings in order to
increase energy efficiency.
The measure consists of support for energy efficiency renovations of small residential buildings.
4.4. Reform: Boosting the green transition in the energy economy
The objective of the measure is to contribute to decarbonising energy in Estonia.
The measure consists of updating the National Development Plan of the Energy Sector and
adopting legislation to accelerate the installation of renewable electricity production capacity.
4.5. Investment: Programme to increase the capacity of the electricity transmission network
The objective of this measure is to enable the connection of additional renewable energy production
to the transmission network.
The measure consists of an increase in the capacity of the electricity transmission network.
6468/26 ADD 1 31
ANNEX ECOFIN 1A EN
4.6. Investment: Programme to boost energy production in industrial areas
The objective of the measure is to incentivise the production of electricity close to consumption.
The measure consists of supporting additional connection capacity for renewable electricity
production in or near industrial sites.
4.7. Investment: Pilot Energy Storage Programme
The objective of the measure is to carry out a pilot programme on renewable energy storage in
Estonia.
The investment consists of grants to companies investing in heat and electricity storage capacity.
4.8. Investment: Boosting offshore wind farms development
The objective of this measure is to make it possible for offshore wind turbines, regardless of their
height, to operate in the Gulf of Riga and Estonian islands Hiiumaa, Saaremaa and Vormsi.
The measure consists of the signature of contracts on designing air surveillance radars and passive
radar systems, construction works for radar buildings and the removal of height restriction on
offshore wind turbines.
6468/26 ADD 1 32
ANNEX ECOFIN 1A EN
D.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Sequential
Number
Related Measure (Reform or
Investment)
Milestone
/Target Name
Qualitative indicators (for
milestones)
Quantitative indicators (for
targets)
Indicative
timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
63 4.1 Energy
efficiency
promotion
Milestone Conclusion of the
cooperation agreement
stipulating conditions
for cooperation between
SA KredEx/Enterprise
Estonia and county
development centers
Conclusion of the
cooperation
agreement
between SA
KredEx/
Enterpise Estonia
and county
development
centers
Q4 2022 Conclusion of a cooperation agreement by
SA KredEx/Enterpise Estonia with county
development centers by which in each
county of Estonia SA KredEx/Enterpise
Estonia shall provide at least one trained
specialist in the county development
centre who shall provide advice on
renovation.
65 4.2 Support for the
renovation of
multi-apartment
buildings
Milestone Publication of calls for
applications for
residential apartment
buildings renovation
grants
Publication of
calls for housing
renovation grants
Q2 2022 SA KredEx/Enterprise Estonia shall
publish calls for applications aimed at
improving the energy efficiency of
residential apartment buildings. The
support shall be differentiated between
regions on the basis of the value of the
real estate, with a higher rate of support
in regions with low average property
value.
Support shall be granted to renovation
projects that achieve an improvement of at
least one energy efficiency class or, in the
case of complete renovations, at least the
energy efficiency class C. The
renovations shall correspond to at least
medium-depth renovations representing an
average level of primary energy savings
of at least 30% as set out in European
Commission Recommendation (EU)
2019/786. The results shall be certified
by ex-ante and ex-post Energy
Performance Certificates.
6468/26 ADD 1 33
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure (Reform or
Investment)
Milestone
/Target Name
Qualitative indicators (for
milestones)
Quantitative indicators (for
targets)
Indicative
timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
66 4.2 Support for the
renovation of
multi-apartment
buildings
Target Multi-apartment
buildings with improved
energy performance
Number of
multi-
apartment
buildings
0 80 Q2 2026 The renovations of at least 80 multi-
apartment buildings shall result in an
average level of primary energy savings
of at least 30%. The results shall be
certified by ex-ante and ex post
(calculated) Energy Performance
Certificates of the building.
68 4.3 Support for the
renovation of small
residential
buildings
Milestone Published calls for
renovation grant
Publication of
calls
Q2 2022 SA KredEx/Enterprise Estonia shall
publish calls for applications aimed at
improving the energy efficiency of
private residential buildings. The support
shall be differentiated between regions
on the basis of the value of the real
estate, with a higher rate of support in
regions with low average property value.
Support shall be granted to renovation
projects that achieve an improvement of
energy efficiency or, in the case of
complete renovations, at least the energy
efficiency class C. The results shall be
certified by ex-ante and ex-post SA
KredEx Energy Performance
calculations. 69a 4.3 Support for the
renovation of small
residential
buildings
Target Small residential
buildings with improved
energy performance
Number of
small
residential
buildings
0 900 Q1 2026 At least 900 small residential buildings
shall be renovated and achieve an
increase in energy efficiency or, in the
case of complete renovations, at least the
energy efficiency class C. The results
shall be certified by ex-ante and ex-post
KredEx Energy Performance
calculations.
6468/26 ADD 1 34
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure (Reform or
Investment)
Milestone
/Target Name
Qualitative indicators (for
milestones)
Quantitative indicators (for
targets)
Indicative
timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
70 4.4 Boosting the
green transition in
the energy
economy
Milestone Government decision on
investments needed to
alleviate the defence
related height
restrictions on wind
parks
Adoption of the
decision of the
Government
Q2 2021 The Government shall adopt a decision on making the necessary investments to
alleviate the defence related height
restrictions on wind parks.
71 4.4 Boosting the
green transition in
the energy
economy
Milestone Adoption of the decision of the Government on
the initiation of the
preparation process of
the National
Development Plan of the
Energy Sector, the
designation of those
responsible and
deadlines
Adoption of the
decision of the
Government
Q4 2021 Government decision on initiating the
preparation process of the National
Development Plan of the Energy Sector
shall be approved, defining the
responsible entity (ies) and setting the
relevant deadlines. The development plan
shall address, inter alia, the objectives of
increasing renewable energy production,
energy efficiency and maintaining and
improving security of supply, as well as the
cessation of the use of oil shale for
electricity production in 2035 and the
phasing out of shale oil production by
2040.
72 4.4 Boosting the
green transition in
the energy
economy
Milestone Entry into force of legal
acts
Legal act entered
into force
Q4 2024 Legal acts shall enter into force to
remove the barriers to installation of
renewable energy generation and storage
facilities for example streamlining
permitting procedures.
6468/26 ADD 1 35
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure (Reform or
Investment)
Milestone
/Target Name
Qualitative indicators (for
milestones)
Quantitative indicators (for
targets)
Indicative
timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
73 4.4 Boosting the
green transition in
the energy
economy
Milestone Adoption of the
National Development
Plan of the Energy
Sector by the
Government
Document
adopted by the
Government
Q4 2025 The National Development Plan of the
Energy Sector shall be adopted by the
Government. The plan shall include the
actions related to the phase-out of direct
burning of oil shale for electricity
production by 2035 with an exception for
out-of-market oil shale for potential
strategic reserve needs in case of
deviation from the reliability standard. The
plan shall include actions related to the
phase-out of the use of shale oil in
domestic heat production by 2040. It
shall also include targets for electricity
generation capacity to be replaced with
renewable energy and other clean energy
technologies.
74 4.5 Programme to
increase the capacity of the
electricity
transmission network
Milestone Signature of network
investment co-financing
contract with
transmission system
operator
Signature of a
contract with the
transmission
system operator
Q1 2022 A co-financing agreement for electricity
network investments shall be concluded
between the Ministry of Economic
Affairs and Communications and Elering
AS. The contract shall set out the
expected results and deadlines.
75 4.5 Programme to
increase the
capacity of the
electricity
transmission
network
Target Additional grid capacity Additional
grid
capacity
(MW)
0 310 Q2 2026 Increase in the capacity of the Estonian
electricity transmission network by at
least 310 MW.
6468/26 ADD 1 36
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure (Reform or
Investment)
Milestone
/Target Name
Qualitative indicators (for
milestones)
Quantitative indicators (for
targets)
Indicative
timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
76 4.6 Programme to
boost energy
production in
industrial areas
Milestone Publication of a call for
proposals for projects
boosting energy
production in industrial
sites
Call for
proposals
published
Q4 2022 An open call shall be published by the
Environmental Investment Centre to
support the grid connection costs of
companies producing electricity from
renewable sources in industrial sites. The
call shall be based on project selection
criteria and award conditions that ensure
that the selected projects comply with
the‘Dono significant harm’ Technical
Guidance (2021/C58/01) through the use
of an exclusion list and the requirement of compliance with the relevant EU and
national environmental legislation.
77 4.6 Programme to
boost energy
production in
industrial areas
Target Additional connection
capacity for renewable
electricity production
Connection
capacity
created
(MW)
0 28 Q2 2026 Additional connection capacity for
renewable electricity production in or
near industrial sites constructed for at
least 28 MW as specified in the
confirmation letter from the network
company.
6468/26 ADD 1 37
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure (Reform or
Investment)
Milestone
/Target Name
Qualitative indicators (for
milestones)
Quantitative indicators (for
targets)
Indicative
timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
78 4.7 Pilot Energy
Storage
Programme
Milestone Publication of a call for
proposals for a pilot
energy storage
programme
Call for
proposals
published
Q4 2022 An open call for proposals shall be
published by the Environmental
Investment Centre to support energy
storage projects.
The call shall be based on project
selection criteria and award conditions
that ensure that the selected projects
comply with the‘Dono significant
harm’Technical Guidance
(2021/C58/01) through the use of an
exclusion list and the requirement of
compliance with the relevant EU and
national environmental legislation. The
selection/eligibility criteria shall specify
that the supported activities and/or
enterprises contribute to climate-neutral
economy, climate resilience and climate
change adaptation, including circular
economy objectives. 80 4.7 Pilot Energy
Storage
Programme
Milestone Additional heat and
electricity storage
capacity resulting from
investment support
Additional
energy storage
capacity
Q2 2026 The investment support scheme shall
result in the installation of at least 23 600
m³ heat storage capacity and at least 10
MW of electricity storage capacity.
80a 4.8 Boosting offshore wind
farms development
Milestone Contractors for the radar
and passive radar
systems selected and
contracts signed
Contracts signed Q4 2024 Contracts signed for the detailed design of air surveillance radar, passive radar
systems and construction works for radar
buildings.
80c 4.8 Boosting offshore wind
farms development
Milestone Removal of the height
restriction on offshore
wind turbines in the Gulf
of Riga and Estonian
islands Hiiumaa,
Saaremaa, Vormsi
Notice Q2 2026 Notice issued by the Ministry of
Defence, stating that the height
restrictions on offshore wind turbines have
been lifted in the Gulf of Riga and
Estonian islands of Hiiumaa, Saaremaa
and Vormsi.
6468/26 ADD 1 38
ANNEX ECOFIN 1A EN
E. COMPONENT 5: SUSTAINABLE TRANSPORT
The component of the Estonian recovery and resilience plan aims at addressing the challenge of
decarbonising the transport sector. The objectives of the component are to reduce emissions and
incentivise the uptake of sustainable modes of transport.
The reform and investments of the component support the development of the cross-border Rail
Baltic project, connecting the three Baltic capitals and countries with Poland and the rest of the
Union. The measures in the component aim at connecting the Rail Baltic with other national
railways and other TEN-T hubs (Tallinn Airport and Old Port) and facilitating access to its local
stops on foot or by bicycle.
The component supports addressing the Country Specific Recommendation to focus investments on
resource efficiency and sustainable transport contributing to decarbonisation of the economy
(Country Specific Recommendation 3 in 2019 and in 2020). The new measures also correspond to
the Country Specific Recommendation to intensify efforts to improve the sustainability of the
transport system, including through electrification of the rail network and by increasing incentives
to encourage sustainable and less polluting transport (Country Specific Recommendation 4 in
2022).
It is expected that no measure in this component does significant harm to environmental objectives
within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description
of the measures and the mitigating steps set out in the recovery and resilience plan in accordance
with the‘Dono significant harm’ Technical Guidance (2021/C58/01).
E.1. Description of the reforms and investments for non-repayable financial support
5.1. Reform: Safe, green, competitive, needs-based and sustainable transport and energy
infrastructure
The objective of the reform is to reduce the CO2 emissions of the transport sector and incentivise
the uptake of sustainable modes of transport.
The measure consists of the adoption of the new Transport and Mobility Development Plan and the
related Implementation Plan to reduce the CO2 emissions and reach a share of renewables in the
energy consumed in the transport sector of 24% by 2035.
5.2. [deleted]
5.2.a Investment: Multifunctional work vessel
The objective of the investment is to ensure the safety and condition of the waterways necessary for
the operation of maritime transport, enable anti-pollution operations to be carried out and increase
research capacity for environmental studies.
The investment consists in building a low-emission vessel.
5.3.a Investment: Construction of the Rail Baltic viaducts and terminal
The objective of the measure is to increase the share of sustainable mobility in Estonia and to
contribute to the Rail Baltic project, which connects the three Baltic States.
The investment consists of the construction of four viaducts and one tunnel, as well as construction
of the Rail Baltic Ülemiste terminal.
6468/26 ADD 1 39
ANNEX ECOFIN 1A EN
The RRF shall support part of the costs of this investment. This investment may also receive
support from other Union programmes or instruments for costs that are not supported by the RRF.
5.3.b Investment: Renovation of a section of the railway from Rapla to Lelle
The objective of the measure is to increase the lifespan of Estonia’s sustainable mobilty network.
The investment consists of renovating the railway superstructure of a 23 km long section of existing
railway from Rapla to Lelle.
5.4. Investment: Construction of the Tallinn Old Port tram line
The objective of the measure is to increase the share of sustainable mobility in the Tallinn region.
The investment consists of constructing a new tramline.
5.5 Investment: Municipalities’ investments in bike- and walkways
The objective of the measure is to reduce car dependency and increase sustainable mobility in areas
outside the three major urban centres (Tallinn, Tartu, Pärnu).
The investment consists of construction works for bike- and walkways.
6468/26 ADD 1 40
ANNEX ECOFIN 1A EN
E.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Sequential
Number
Related Measure (Reform or
Investment)
Milestone
/Target Name
Qualitative indicators (for
milestones)
Quantitative indicators (for
targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
81 5.1 Safe, green,
competitive, needs-
based and
sustainable transport
and energy
infrastructure
Milestone Adoption of the
Transport and
Mobility
Development Plan
2021-2035 by the
Government
Adoption of the
Transport and
Mobility
Development Plan
2021-2035
Q1 2022 The Transport and Mobility
Development Plan 2021-2035 shall be
approved by the Government. It shall
include the creation of the Tallinn
capital region common transport
system, actions to facilitate uptake of
local biomethane, actions to develop
sustainable and active urban
mobility in bigger towns following
the logic of integrated transport
corridors, planning multimodal
infrastructure, increasing the
connections, speed and safety of rail,
making the maritime transport sector
more competitive and greener and
connect it multimodally, developing
faster and safer road transport.
The plan shall include a target to
reduce CO2 emissions by 700 000
tons (or 30%) compared to 2018
levels and reach a share of
renewables in the energy consumed
in the transport sector of 24% by
2035.
6468/26 ADD 1 41
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure (Reform or
Investment)
Milestone
/Target Name
Qualitative indicators (for
milestones)
Quantitative indicators (for
targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
82 5.1 Safe, green,
competitive, needs-
based and
sustainable transport
and energy
infrastructure
Milestone Adoption of the
Implementation Plan
for green sustainable
public transport
development of the
Transport and
Mobility
Development Plan
2021-2035
Adoption of the
Implementation Plan
Q4 2022 The implementation plan shall be
approved by the Steering Committee
of the Transport and Mobility Development Plan 2021-2035. It
shall include the creation of the
Tallinn capital region common
transport system, actions to facilitate
uptake of local biomethane, actions to
develop sustainable and active urban
mobility in bigger towns following
the logic of integrated transport
corridors, planning multimodal
infrastructure, increasing the
connections, speed and safety of rail,
making the maritime transport sector
more competitive, greener and
connect it multimodally, developing
faster and safer road transport. The
implementation plan shall include an
annual reporting obligation on the
responsible minister to the
Government.
84a 5.2.a Multifunctional
work vessel
Milestone Contract signed for
building of the vessel
Contract signed Q1 2024 The contract for the building of the
multifunctional work vessel shall be
signed by the contractor and the
National Fleet (Riigilaevastik). The
contract shall include a specification
of the fuel to be used by the vessel in
line with‘DoNo Significant
Harm’requirements set out in the
description of the investment.
85a 5.2.a Multifunctional
work vessel
Milestone Multifunctional work
vessel built
Vessel built Q2 2026 The multifunctional work vessel
shall be built.
6468/26 ADD 1 42
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure (Reform or
Investment)
Milestone
/Target Name
Qualitative indicators (for
milestones)
Quantitative indicators (for
targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
86a 5.3.a Construction of
the Rail Baltic
viaducts and
terminal
Milestone Works contracts for
the construction of
Rail Baltic viaducts
Works contracts
signed
Q3 2023 Works contracts signed for the
following Rail Baltic viaducts:
Kangru viaduct, Raudalu viaduct,
Raku viaduct, Männiku light traffic
viaduct and Männiku light traffic
tunnel.
87a 5.3.a. Construction of the Rail Baltic
viaducts and
terminal
Milestone Viaducts constructed
and disbursement
made for
construction work of
terminal
Acceptance
certificates issued for
the construction of
the viaducts and
disbursement made
Q2 2026 Certificates of acceptance shall be
issued for the construction of the
Kangru viaduct, Raudalu viaduct,
Raku viaduct, Männiku light traffic
viaduct and Männiku light traffic
tunnel.
At least EUR 8.84 million shall be paid
towards the construction of
theÜlemiste terminal. Any amounts
provided by other Union
programmes or instruments shall not
be counted towards this amount.
88b 5.3b Renovation of a
section of the
railway from Rapla
to Lelle
Milestone Renovation of
railway section
Certificate of
acceptance
Q1 2026 Certificate of acceptance for the
renovation of 23 km of railway in the
section Rapla to Lelle.
89 5.4 Construction of
the Tallinn Old Port
tram line
Milestone Completion of the
tramway
construction project
design
Approval of the
project design
Q4 2021 Tallinn Urban Planning and Utilities
Board shall adopt the design of the
tramway construction project.
90 5.4 Construction of
the Tallinn Old Port
tram line
Milestone Award of works
contract
Contract signed for
the construction of
the tramway line
Q2 2022 Works contract concluded between
Tallinn Urban Planning and Utilities
Board and the contractor for the
construction of the tramway line
between Gonsiori street and Põhja
Puiestee.
6468/26 ADD 1 43
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure (Reform or
Investment)
Milestone
/Target Name
Qualitative indicators (for
milestones)
Quantitative indicators (for
targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
91 5.4 Construction of
the Tallinn Old Port
tram line
Milestone New tramway line New tramway line in
operation
Q4 2025 New 2 500m section of tramway line
in operation as confirmed by the
permit to operate.
92 5.5
Municipalities’invest
ments in bike- and
walkways
Milestone Call for proposals for
grants
Publication of the
notice for call for
proposals for grants
Q4 2022 An open call for investment by
municipalities in bike- and walkways
shall be published.
93 5.5 Municipalities’ investments in bike-
and walkways
Target Construction works on bike- and
walkways delivered
Construction
works
0 18 Q4 2025 At least 18 construction works of
bike and walkways shall be
delivered.
6468/26 ADD 1 44
ANNEX ECOFIN 1A EN
F. COMPONENT 6: HEALTHCARE AND SOCIAL PROTECTION
This component of the Estonian recovery and resilience plan aims to address the challenges related
to the resilience of and access to the health care system, the adequacy of the social safety net,
accessibility of social services and youth unemployment. The objectives of the measures included in
the component are to: address workforce shortages in the health sector, strengthen primary and
hospital care, extend the duration of the unemployment insurance benefit in periods of high
unemployment, improve access to social services, address youth unemployment and reduce the
gender pay gap.
The component supports addressing the Country Specific Recommendation, on improving the
accessibility and resilience of the health system, including by addressing the shortages of health
workers, strengthening primary care and ensuring the supply of critical medical products (Country
Specific Recommendation 1 in 2020), on improving the social safety net, increasing access to social
services in an integrated way (Country Specific Recommendation 2 in 2019, Country Specific
Recommendation 2 in 2020 and Country Specific Recommendation 3 in 2022) and on reducing the
gender pay gap, including by improving wage transparency (Country Specific Recommendation 2
in 2019).
It is expected that no measure in this component does significant harm to environmental objectives
within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description
of the measures and the mitigating steps set out in the recovery and resilience plan in accordance
with the‘Dono significant harm’ Technical Guidance (2021/C58/01).
F.1. Description of the reforms and investments for non-repayable financial support
6.1. Reform: A comprehensive change in the organisation of health care in Estonia
The objective of the reform is to support the resilience of the Estonian health system, including for
coping with crises, thus ensuring that people have access to high-quality, integrated healthcare
throughout Estonia.
The measure consists of reforms
a. to consolidate the hospital network,
b. to outline the provision of health services in the various health sectors,
c. to incentivise doctors, nurses and pharmacists to work in remote areas, and
d. to increase the admission in medical professions with shortages.
6.2. [deleted]
6.2.a Investment: Construction of TERVIKUM
The objective of the investment is to contribute to improving the access to health care as well as the
provision of health and social care in an integrated way.
The investment consists of building a new health centre in the city of Viljandi.
6.3. Reform: Strengthening primary health care
The objective of the reform is to ensure access to general medical care, improve the continuity of
treatment and make provision of primary health care more flexible and human-centred. The reform
consists of three sub-measures. First, in order to improve access to specialist care the use of e-
consultation in primary care was extended on 30 September 2020 allowing patients to be advised by a
specialist without having to consult them face-to-face. Second, legislation entered into force on 31
6468/26 ADD 1 45
ANNEX ECOFIN 1A EN
March 2021 improving access to health care by increasing the level of support for general
practitioners and by modifying the funding model for general medical care with a view to making
working in primary health centres in remote areas more attractive. Third, the Health Services
Organisation Act shall be amended as regards the management of the list of patients, ensuring
continuity of primary care and extending the rights of nurses to prescribe medicines to patients.
The implementation of the reform shall be completed by 31 March 2023.
6.4. Reform: Renewal of the eHealth Governance
The objective of the reform is to update the governance framework for eHealth with a view to better
responding to the needs of the health system and ensure the development of digital solutions to
support a sustainable health system in Estonia. The reform consists of adopting a revised national
governance model for information and communication technology of the current health system to
provide a forward-looking new eHealth governance model and promote a common understanding
among partners of the division of roles and responsibilities in eHealth.
The implementation of the reform shall be completed by 30 June 2023.
6.5. [deleted]
6.6. Investment: Providing labour market measures to reduce youth unemployment
The objective of the investment is to help young people get into employment.
The measure consists of a legislation on the renewed“Myfirst job” (M1T) scheme; support for the
enrolement in labour market related measures, and a reinforced Youth Guarantee Action Plan.
6.7. Reform: Extending the duration of unemployment insurance benefits
The objective of the reform is to address the long-standing challenge of improving the adequacy of
the social safety net. The reform consists of the establishment of a mechanism to activate the
extension of the period of the unemployment insurance benefits by 60 days, notably when the
registered unemployment rate exceeds the non-accelerating inflation/wage rate of unemployment
(NAIRU/NAWRU) by a significant margin. The mechanism of prolongation and the margin, which
shall not be higher than 2%, shall be agreed upon in dialogue with the social partners. The measure
aims at helping people to bridge a longer period of unemployment in difficult labour market
conditions.
The reform shall be implemented by 30 June 2023.
6.8. Reform: Long-term care
The objective of the reform is to support the provision of long-term care.
The reform consists of legislative amendments to define the concept of long-term care, to provide
for the modernisation and integration of services for children with higher care needs, and an Action
plan for integrated social and health care.
6.9. Reform: Reducing gender pay gap
The objective of the reform is to reduce the gender pay gap. The reform consists of the adoption of
the Welfare Development Plan for 2023-2030 and its implementation and the roll out of a digital
gender pay gap tool. The Welfare Development Plan shall be adopted by 31 March 2024 and it shall
6468/26 ADD 1 46
ANNEX ECOFIN 1A EN
lay down the strategic objectives of reducing social inequalities and poverty, ensuring gender
equality and greater social inclusion, and promoting equal treatment of persons belonging to
minority groups. The Development Plan shall outline measures to reduce the gender pay gap, in
particular by increasing wage transparency, reducing the prevalence and negative impact of gender
stereotypes on the lives and decisions of women and men, including concerning educational and
career choices and carrying the care burden, and supporting a more effective implementation of the
Gender Equality Act. A digital gender pay gap tool shall be rolled out by 31 March 2024 which
shall offer employers a simple and easy tool to receive and analyse data and information concerning
the gender pay gap and its possible reasons in their organisations and thereby supporting them in
making informed decisions and taking effective action to implement the principle of equal pay and
to reduce the gender pay gap.
The implementation of the reform shall be completed by 31 March 2024.
6468/26 ADD 1 47
ANNEX ECOFIN 1A EN
F.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Sequential
Number
Related Measure (Reform or Investment)
Milestone
/Target Name
Qualitative indicators (for
milestones)
Quantitative indicators (for targets) Indicative timeline for
completion Description of each
milestone and target Unit of
measure Baseline Goal Quarter Year
94 6.1 A comprehensive
change in the
organisation of health
care in Estonia
Milestone Entry into force of
the Government
Order on the
Hospital network
development
roadmap
Entry into force of
the Government
Order
Q4 2024 Entry into force of the
Government Order which shall
lay down:
- the list of regional, central,
local and rehabilitation hospitals
in order to ensure equal access to
health care services;
- objectives and steps to be taken
for consolidating the hospital
network;
- the necessary investments for
the construction and renovation
of the hospitals included in the
list of hospitals.
95 6.1 A comprehensive
change in the
organisation of health
care in Estonia
Milestone Approval of the
Strategic Framework
for addressing health
workforce shortages
Approval of the
Strategic
Framework for
addressing health
workforce
shortages by the
Minister of Health
and Labour
Q4 2022 The Strategic Framework for
addressing health workforce
shortages shall outline:
- measures on the organisation of
health care services in the
different health sectors, in
particular specialised care,
- allocation of physical and
human resources to ensure the
provision of health care
throughout the territory,
- financing, governance and
information exchange
mechanisms that ensure
performance throughout the
country.
6468/26 ADD 1 48
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure (Reform or Investment)
Milestone
/Target Name
Qualitative indicators (for
milestones)
Quantitative indicators (for targets) Indicative timeline for
completion Description of each
milestone and target Unit of
measure Baseline Goal Quarter Year
96 6.1 A comprehensive
change in the
organisation of health
care in Estonia
Milestone Entry into force of
the Decrees of the
Minister of Health
and Labour
amending the
reimbursement
system for doctors
and pharmacists
Entry into force of
the Decrees of the
Minister of Health
and Labour
Q1 2023 Entry into force of the Decrees of the Minister of Health and
Labour which shall improve the
reimbursement system for
doctors and pharmacists to
incentivise the health workforce
to work in remote areas.
96a 6.1 A comprehensive
change in the
organisation of health
care in Estonia
Milestone Entry into force of the
Decree of the Minister
of Health and Labour
and the amendment to
the Health Services
Organisations Act
establishing the
reimbursement
system for nurses
Entry into force of
the Decree of the
Minister of Health
and Labour and of
the amendment to the
Health Services
Organisations Act
Q2 2024 Entry into force of the Decree of the Minister of Health and
Labour and the amendment to the
Health Services Organisations
Act which shall establish the
reimbursement system for
nurses to incentivise them to
work in remote areas. This
reimbursement system shall
cover general and advanced
practice nurses, in primary
health care and hospitals.
97 6.1 A comprehensive
change in the
organisation of health
care in Estonia
Target Admission to
nursing training
Percentage
increase in the
number of
persons
admitted to
nursing training
0 5 Q4 2023 The admission of persons to
nursing training has been
increased by 5% compared to
2020.
6468/26 ADD 1 49
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure (Reform or Investment)
Milestone
/Target Name
Qualitative indicators (for
milestones)
Quantitative indicators (for targets) Indicative timeline for
completion Description of each
milestone and target Unit of
measure Baseline Goal Quarter Year
98 6.1 A comprehensive
change in the
organisation of health
care in Estonia
Milestone Entry into force of
the Ministerial
Regulation
amending the
agreement between
the Ministry of
Social Affairs and the
University of
Tartu on the shortage of doctors in certain
specialisations
Entry into force of
the Ministerial
Regulation and
agreement between
the Ministry of
Social Affairs and
the University of
Tartu
Q2 2026 Entry into force of the
Ministerial Regulation
amending the agreement
between the Ministry of Social
Affairs and the University of
Tartu which shall lay down the
requirements for the gradual
increase of admission in medical
professions with shortages.
99a 6.2.a Construction of
TERVIKUM
Milestone Signature of the
contract for the
construction of
TERVIKUM
Signature of the
contract
Q2 2023 The Riigi Kinnisvara AS (the
representative of the Viljandi
Haigla) and the contractor shall
sign a contract for the
construction of TERVIKUM,
including the installation of the
technical building systems, in
particular the technical
equipment for heating, cooling,
ventilation, hot water, lighting
and electricity production,
measurement, monitoring and
control systems and interior
works.
100a 6.2.a Construction of
TERVIKUM
Milestone TERVIKUM
constructed
TERVIKUM
constructed
Q4 2025 The TERVIKUM, consisting of
a general hospital and health
care centre, shall be
constructed.
6468/26 ADD 1 50
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure (Reform or Investment)
Milestone
/Target Name
Qualitative indicators (for
milestones)
Quantitative indicators (for targets) Indicative timeline for
completion Description of each
milestone and target Unit of
measure Baseline Goal Quarter Year
106 6.3 Strengthening
primary health care
Milestone Entry into force of the
Decree of the
Government, which
amends the list of
health care services
of the Estonian
Health Insurance
Fund on access to
specialised medical
care
Entry into force of
legislative
amendments to the
Decree of the
Government
Q3 2020 Entry into force of legislative
amendments which shall
improve the access to
specialised care by extending the
use of e-consultation in primary
care allowing patients to be
advised by a specialist without
having to consult them face-to-
face.
107 6.3 Strengthening
primary health care
Milestone Entry into force of
amendments to the
Decree of the
Government which
amends the list of
health care services
of the Estonian
Health Insurance
Fund on costs and
services of general
practitioners
Entry into force of
the legislative
amendments to the
Decree of the
Government
Q1 2021 Legislative amendments shall
enter into force providing for the
financing of fixed costs and
services for general
practitioners in order to increase
the allocation of resources to
primary medical practice
outside metropolitan areas,
especially in remote areas, and to increase patients’ access to
diagnostic and screening services.
108 6.3 Strengthening
primary health care
Milestone Entry into force of
amendments to the
Health Services
Organisation Act
Provision in the law
indicating the entry
into force of the
law
Q1 2023 Entry into force of the
amendments to Health Services
Organisation Act which shall
amend the management of the list
of patients, ensure continuity of
primary care and extend the
rights of nurses to prescribe
medicines to patients.
6468/26 ADD 1 51
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure (Reform or Investment)
Milestone
/Target Name
Qualitative indicators (for
milestones)
Quantitative indicators (for targets) Indicative timeline for
completion Description of each
milestone and target Unit of
measure Baseline Goal Quarter Year
109 6.4 Renewal of the
eHealth Governance
Milestone Approval of the
eHealth Governance
Framework and its
implementation
roadmap
Approval of the
proposal on the
eHealth
Governance
Framework and
implementation
roadmap by the
Steering
Committee of
the“Eesti tervise
IKT juhtimise
raamistik”
Q2 2023 Approval of the proposal on the
Governance Framework and
implementation roadmap which
shall update the governance
framework for eHealth and the
coordination of the
development of eHealth
services.
113 6.6 Providing labour
market measures to
reduce youth
unemployment
Milestone Entry into force of
the Decree of the
Minister of Health
and Labour to
strengthen the “My
First Job” scheme
Entry into force of
the Decree of the
Minister of Health
and Labour
Q1 2022 Entry into force of the Decree of the Minister of Health and
Labour which shall define the
characteristics of the scheme
and the conditions for its
implementation, including
financing and target group. The
aim of the scheme shall be to
enable young people without
work experience or with little
work experience to gain work
experience and to improve their
skills to participate in the labour
market.
6468/26 ADD 1 52
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure (Reform or Investment)
Milestone
/Target Name
Qualitative indicators (for
milestones)
Quantitative indicators (for targets) Indicative timeline for
completion Description of each
milestone and target Unit of
measure Baseline Goal Quarter Year
114 6.6 Providing labour
market measures to
reduce youth youth
unemployment
Milestone Youth Guarantee
Action Plan
Adoption of the
reinforced Youth
Guarantee Action
Plan by the
Government
Q2 2022 The Government shall adopt an
amended Youth Guarantee
Action Plan to support youth
employment. This action plan
shall
- include measures to improve
the skills of young people,
- define actions to prevent and
address youth unemployment,
including outreach and
prevention of NEET-situation -
define key parties and their
roles of preventing and dealing
with youth unemployment.
115 6.6 Providing labour
market measures to
reduce youth
unemployment
Target Number of young
people enrolled in
labour market related
measures
Number of
participants
0 3 178 Q4 2025 At least 3 178 young people
aged 15-29 have been enrolled
in labour market related
measures, of which at least
2 000 in the“MyFirst
Job”scheme.
6468/26 ADD 1 53
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure (Reform or Investment)
Milestone
/Target Name
Qualitative indicators (for
milestones)
Quantitative indicators (for targets) Indicative timeline for
completion Description of each
milestone and target Unit of
measure Baseline Goal Quarter Year
116 6.7 Extending the
duration of
unemployment
insurance benefits
Milestone Entry into force of
the amendments to
the Unemployment
Services and
Benefits Act and the
Unemployment
Insurance Act
Entry into force of
the legislative
amendments
Q2 2023 Entry into force of the
amendments to the Act which
shall lay down a permanent
mechanism to activate the
extension of the duration of
unemployment insurance
benefits by 60 days, notably
when the registered
unemployment rate exceeds the
non-accelerating inflation/wage
rate of unemployment by a
significant margin. The
mechanism of prolongation and
the margin, which shall not be
higher than 2%, shall be agreed
upon in dialogue with the social
partners.
117 6.8 Long-term care Milestone Entry into force of
amendments to the
Social Welfare Act
Entry into force of
legislative
amendments
Q2 2022 Entry into force of legislative amendments to the Social
Welfare Act which shall lay
down the concept of long-term
care and require local
authorities to take into account
the principle that a person must
be able to live as long as
possible in his or her home, in his
or her usual environment, with
sufficient quality services
available.
6468/26 ADD 1 54
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure (Reform or Investment)
Milestone
/Target Name
Qualitative indicators (for
milestones)
Quantitative indicators (for targets) Indicative timeline for
completion Description of each
milestone and target Unit of
measure Baseline Goal Quarter Year
118 6.8 Long-term care Milestone Action Plan on an
integrated care
model
Adoption of the
Action Plan
Q4 2022 The Ministry of Social Affairs
shall adopt an Action Plan that
provides for the establishment
of an integrated care model
throughout Estonia and the
roles and responsibilities of the
actors involved in the future
financing model of the system.
120 6.8 Long-term care Milestone Entry into force of
the legislative
amendments of the
support system for
children with higher
care needs
Entry into force of
the legislative
amendments
Q1 2025 Entry into force of the legal act
which shall provide for the
modernisation and integration
of services for children with
higher care needs. In particular,
- services in the health,
education, social protection and
employment areas shall be
integrated in order to provide
support for families under care
burden, and
- the current support system
shall be simplified and the
assessment of care needs
consolidated.
121 6.9 Reducing gender
pay gap
Milestone Adoption of the
Welfare
Development Plan
2023-2030 by the
government
Adoption of the
Welfare
Development Plan
Q1 2024 The Plan shall outline the
measures to reduce the gender
pay gap.
6468/26 ADD 1 55
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure (Reform or Investment)
Milestone
/Target Name
Qualitative indicators (for
milestones)
Quantitative indicators (for targets) Indicative timeline for
completion Description of each
milestone and target Unit of
measure Baseline Goal Quarter Year
122 6.9 Reducing gender
pay gap
Milestone Digital gender pay
gap tool
Developing a
prototype of a
gender pay gap
tool
Q4 2022 A prototype of a gender pay gap
tool for employers shall be
developed with the aim of
providing them with data and
information concerning the
gender pay gap and its possible
reasons in their organisations
and thereby supporting making
informed decisions and taking
effective action in order to
implement the principle of
equal pay and to reduce the
gender pay gap.
123 6.9 Reducing gender
pay gap
Milestone Digital gender pay
gap tool
Roll-out of a
digital gender pay
gap tool
Q1 2024 The digital gender pay gap tool
shall be available to employers
with the aim of providing them
with data and information
concerning the gender pay gap
and its possible reasons in their
organisations and thereby
supporting making informed
decisions and taking effective
action in order to implement the
principle of equal pay and to
reduce the gender pay gap.
6468/26 ADD 1 56
ANNEX ECOFIN 1A EN
G. AUDIT AND CONTROL
G.1. DESCRIPTION OF THE REFORMS AND INVESTMENTS FOR NON-REPAYABLE FINANCIAL
SUPPORT
The objective of the reform is to set the legal framework for the implementation and monitoring of
the recovery and resilience plan. It shall define the roles played by relevant public entities in the
implementation of the plan and how these bodies shall carry out their tasks.
The implementation of the reform shall be completed by 31 December 2021.
6468/26 ADD 1 57
ANNEX ECOFIN 1A EN
G.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Sequential
Number
Related Measure (Reform or
Investment)
Milestone
/Target Name
Qualitative indicators (for
milestones)
Quantitative indicators (for targets) Indicative
timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
124 Monitoring and
implementation of
the plan
Milestone Entry into force of the
Government
Regulation on the legal
framework for the
implementation and
monitoring of the
recovery and
resilience plan of
Estonia.
Entry into force of
government
regulation
Q4 2021 Entry into force of the regulation
establishing the legal framework for the
implementation and monitoring of the
recovery and resilience plan of Estonia
before the first payment request is
made. The regulation shall at least
define the authorities involved in the
implementation of the recovery and
resilience plan of Estonia and their
tasks including the tasks of the Ministry of Finance, the sectoral ministries and
the State Shared Service Center.
6468/26 ADD 1 58
ANNEX ECOFIN 1A EN
H. COMPONENT 8: REPOWEREU
The REPowerEU chapter addresses the challenge of reducing reliance on fossil fuels. The objectives of the component are to facilitate the deployment of renewable energy sources; to
facilitate decarbonising selected economic sectors; to increase the capacity of the electricity
distribution network; to boost the uptake of sustainable biomethane and to accelerate the integration
of renewable energy sources.
The REPowerEU chapter supports addressing the Country Specific Recommendation to reduce overall reliance on fossil fuels by accelerating the deployment of renewables, including through
further streamlining of permitting procedures and strengthening the domestic electricity network
(Country Specific Recommendation 4 in 2022).
It is expected that no measure in this component does significant harm to environmental objectives
within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description
of the measures and the mitigating steps set out in the recovery and resilience plan in accordance
with the‘Dono significant harm’ Technical Guidance (2021/C58/01).
The implementation of the measure facilitating the deployment of renewable energy sources, the
measure to increase the access of renewable energy production to the electricity distribution
network and the measure increasing production and uptake of sustainable biomethane are all
expected to contribute to reducing dependency on fossil fuels. Increasing the share of renewable
energy sources has a cross-border or multi-country dimension, especially in the Baltic region and
Finland, because it contributes to securing the energy supply in the Union as a whole. Less
dependency on imported fossil fuels will also create European added value as it will free up supply
for other Member States, in the current situation of natural gas supply constraints, and until other
Member States succeed in reducing their dependency on fossil fuels.
H.1. Description of the reforms and investments for non-repayable financial support
8.1 Reform: Facilitating the development of renewable energy sources
The objective of the reform is to facilitate the development of renewable energy sources, notably
wind energy.
The reform consists of legislative amendments to streamline planning, permitting and
environmental impact assessment processes for wind energy projects; the establishment of wind
priority development areas; support to local authorities to improve administrative procedures,
including permitting, for wind energy development.
8.2. Investment: Programme to increase the access of renewable energy production to the
electricity distribution network
The objective of the investment is to facilitate the use/development of electricity from renewable
energy sources.
The investment consists of works in the electricity network to increase its capacity.
8.3. Investment: Increasing production and uptake of sustainable biogas and biomethane
The objective of this measure is to boost the uptake of sustainable biogas and sustainable
biomethane and to accelerate the integration of renewable energy sources.
6468/26 ADD 1 59
ANNEX ECOFIN 1A EN
The investment consists of an action plan for increasing the production and use of sustainable
biogas and sustainable biomethane, and support for the uptake of sustainable biomethane.
6468/26 ADD 1 60
ANNEX ECOFIN 1A EN
H.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Sequential
Number
Related Measure (Reform or
Investment)
Milestone
/Target Name
Qualitative indicators (for
milestones)
Quantitative indicators (for targets) Indicative
timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
125 8.1 Facilitating the
development of
renewable energy
sources
Milestone Publication of the call
for proposals to
support local
authorities
Publication of the
call for proposals
Q3 2023 A call for proposals shall be published
to support local authorities to hire
experts or procure services aimed at
improving administrative procedures,
including permitting, for wind energy
development.
126 8.1 Facilitating the
development of
renewable energy
sources
Milestone Entry into force of
the amendments to
the relevant laws
streamlining
permitting, planning and environmental
impact assessment
processes
Entry into force of
the amendments
Q2 2024 Legislative amendments to streamline
permitting, planning and environmental
impact assessment processes for wind
energy projects shall enter into force.
These shall include amending the
following laws to the extent necessary:
the Building Code, the Water Act, the
Planning Act, the Environmental
Impact Assessment and Environmental
Management System Act, the
Environmental Charges Act and the
Forest Act.
127 8.1 Facilitating the
development of
renewable energy
sources
Milestone Governmental
decision establishing
priority development
areas for wind
energy
Governmental
decision adopted
Q3 2024 The government shall adopt a decision
establishing priority areas for wind
energy development. The government
shall adopt the decision on the basis of
a technical report.
128 8.1 Facilitating the
development of
renewable energy
sources
Target Support to local
authorities
Number of
local authorities
supported
0 20 Q1 2025 Following the call for proposals set out
in milestone 125 or through the use of
centrally procured services, 20 local
authorities shall have received support to
improve administrative procedures,
including permitting, for wind energy
development.
6468/26 ADD 1 61
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure (Reform or
Investment)
Milestone
/Target Name
Qualitative indicators (for
milestones)
Quantitative indicators (for targets) Indicative
timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
129 8.2 Programme to
increase the access
of renewable
energy production to the electricity
distribution
network
Milestone Signature of the co-
financing agreement
for electricity
distribution network
works
Signed agreement Q1 2024 Signature of the co-financing
agreement, for electricity distribution
network works, between the Ministry
of Economic Affairs and
Communications and Elering AS for
the purpose of increasing the capacity
of the electricity distribution network
by 160 MW.
130 8.2 Programme to
increase the access
of renewable
energy production
to the electricity
distribution
network
Target Additional 160 MW
capacity available
MW of
additional
capacity
available
0 160 Q1 2026 Electricity distribution network works
shall result in an increase in the
capacity of the electricity distribution
network of 160 MW.
131 8.3 Increasing production and
uptake of sustainable biogas
and biomethane
Milestone Call for applications
for grants to support
the uptake of
biomethane
Call for
applications
published
Q2 2024 Publication of a call for applications for
grants to support the uptake of sustainable biomethane in line with the
Renewable Energy Directive (RED II). The call shall contain, among the
selection criteria, the requirement set
out in the description of the investment.
133 8.3 Increasing production and
uptake of sustainable biogas
and biomethane
Milestone Action plan for the
production and use
of biogas and
biomethane
Approved plan Q2 2025 The Minister of Climate and the
Minister of Regional Affairs and Agriculture shall approve the action
plan for the production and use of sustainable biogas and sustainable
biomethane.
6468/26 ADD 1 62
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure (Reform or
Investment)
Milestone
/Target Name
Qualitative indicators (for
milestones)
Quantitative indicators (for targets) Indicative
timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
134 8.3 Increasing
production and
uptake of
sustainable biogas
and biomethane
Target Installation of new
biomethane
production capacity
Increase in
installed
production
capacity of
sustainable
biomethane in
cubic metres
0 4 000 000 Q2 2026 Installed capacity for the production of
sustainable biomethane shall increase by
at least 4 000 000 cubic metres under
the support scheme as demonstrated in
the final project implementation
reports.
6468/26 ADD 1 63
ANNEX ECOFIN 1A EN
2. Estimated total cost of the recovery and resilience plan
The estimated total cost of the modified RRP including the REPowerEU chapter of Estonia is
EUR 953 380 000.
The estimated total cost of the REPowerEU chapter is EUR 90 040 000. In particular, the estimated
total costs of the measures referred to in Article 21c(3), point (a) of Regulation (EU) 2023/435 is
EUR 0 whilst the costs of the other measures in the REPowerEU chapter is EUR 90 040 000.
SECTION 2: FINANCIAL SUPPORT
1. Financial contribution
The instalments referred to in Article 2(2) shall be organised in the following manner:
First Instalment (non-repayable support):
Sequential
Number
Related Measure
(Reform or Investment) Milestone
/Target Name
23 2.1. Green transition of
enterprises Milestone
Creation of a Green Transition Task Force to implement
and monitor the green transition
28 2.3. Green technology
development programme Milestone
Establishment of a working group to plan and set up the
development programme
37 2.6. Green Fund Milestone Signature of contractual agreement between the
Ministry of Economic Affairs and Communications and
SmartCap
38 2.6. Green Fund Milestone Adoption of the investment policy document by
SmartCap
44
3.1. Creation and
development of a centre of
excellence for data
governance and open data
Milestone
Setting up a data management team in the Statistical
Office, the Ministry of Economic Affairs and
Communications and the State Information System
Authority
70 4.4. Boosting the green
transition in the energy
economy
Milestone Government decision on investments needed to alleviate
the defence related height restrictions on wind parks
71
4.4. Boosting the green
transition in the energy
economy Milestone
Adoption of the decision of the Government on the
initiation of the preparation process of the National
Development Plan of the Energy Sector, the designation
of those responsible and deadlines
74 4.5. Programme to increase the
capacity of the electricity
transmission network
Milestone Signature of network investment co-financing contract
with transmission system operator
81
5.1. Safe, green, competitive,
needs-based and sustainable
transport and energy
infrastructure
Milestone Adoption of the Transport and Mobility Development
Plan 2021-2035 by the Government
89 5.4. Construction of the
Tallinn Old Port tram line Milestone Completion of the tramway construction project design
106 6.3. Strengthening primary
health care Milestone
Entry into force of the Decree of the Government,
which amends the list of health care services of the
Estonian Health Insurance Fund on access to specialised
medical care
6468/26 ADD 1 64
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure
(Reform or Investment) Milestone
/Target Name
107 6.3. Strengthening primary
health care Milestone
Entry into force of amendments to the Decree of the
Government which amends the list of health care
services of the Estonian Health Insurance Fund on costs
and services of general practitioners
113 6.6. Providing labour market
measures to reduce youth
unemployment
Milestone Entry into force of the Decree of the Minister of Health
and Labour to strengthen the“MyFirst Job” scheme
124 Audit and Control Milestone Entry into force of the Government Regulation on the
legal framework for the implementation and monitoring
of the recovery and resilience plan of Estonia.
Instalment
Amount EUR 142 977 720
Second Instalment (non-repayable support):
Sequential
Number
Related Measure (Reform
or Investment) Milestone
/Target Name
1 1.1. Digital transformation in
enterprises Milestone
Call for proposals with award criteria and award
conditions
11 1.4. Skills reform for the
digital transformation of
businesses
Milestone Entry into force of secondary legislation setting out the
terms of support for the development of digital skills
16
1.5 Supporting the
competitiveness of
enterprises in foreign
markets
Milestone Preparation of the development of strategies
19
1.5 Supporting the
competitiveness of
enterprises in foreign
markets
Milestone Preparatory analysis to define the content and the
locations of business centres
21
1.5 Supporting the
competitiveness of
enterprises in foreign
markets
Milestone Setting-up of impact groups and selection of
destinations for global digital missions
25 2.2. Green skills to support
the green transition of
enterprises
Milestone Entry into force of secondary legislation setting out the
terms of support for the development of green skills
32 2.4. Modernisation of the
business models in
manufacturing companies
Milestone Entry into force of the ministerial decree setting out the
terms and conditions of grant eligibility
34 2.5. Resource efficient green
technologies Milestone Publication of call for proposals for grants
51 3.4. #Bürokratt programme
(national virtual assistant) Target
Access to digital public services through the virtual
assistant platform
54
3.5. Reconfiguration of basic
digital services and safe
transition to cloud
infrastructure
Milestone Development of centrally delivered/shared IT base
services
65 4.2. Support for the
renovation of multi-
apartment buildings
Milestone Publication of calls for applications for residential
apartment buildings renovation grants
68 4.3. Support for the
renovation of small
residential buildings
Milestone Published calls for renovation grant
90 5.4. Construction of the
Tallinn Old Port tram line Milestone Award of works contract
6468/26 ADD 1 65
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure (Reform
or Investment) Milestone
/Target Name
114 6.6. Providing labour market
measures to reduce youth
unemployment
Milestone Youth Guarantee Action Plan
117 6.8. Long-term care Milestone Entry into force of amendments to the Social Welfare
Act
Instalment
Amount EUR 142 977 720
Third Instalment (non-repayable support):
Sequential
Number
Related Measure (Reform
or Investment) Milestone /
Target Name
7 1.3. Development of digital
waybills services Target
eFTI (electronic Freight Transport Information)
platforms development
24 2.1. Green transition of
enterprises Milestone
Adoption of the Circular Economy Action Plan by the
Green Transition Task Force
41
2.7. Creating opportunities
for the uptake of renewables-
based green hydrogen
technologies
Milestone Entry into force of the ministerial decree setting out the
terms and conditions for granting support
47 3.2. Development of event
services for individuals Target
Launch of personal life event services and/or pro-active
services
49 3.3. Development of event
services and digital gateway
for entrepreneurs
Target Deployment of IT developments contributing to the
implementation of the business event services and
gateway
63 4.1. Energy efficiency
promotion Milestone
Conclusion of the cooperation agreement stipulating
conditions for cooperation between SA
KredEx/Enterprise Estonia and county development
centers
76 4.6. Programme to boost
energy production in
industrial areas
Milestone Publication of a call for proposals for projects boosting
energy production in industrial sites
78 4.7. Pilot Energy Storage
Programme Milestone
Publication of a call for proposals for a pilot energy
storage programme
82
5.1. Safe, green, competitive,
needs-based and sustainable
transport and energy
infrastructure
Milestone
Adoption of the Implementation Plan for green
sustainable public transport development of the
Transport and Mobility Development Plan 2021-2035
92 5.5.
Municipalities’investmen
ts in bike- and walkways
Milestone Call for proposals for grants
95 6.1. A comprehensive change in the organisation of
health care in Estonia
Milestone Approval of the Strategic Framework for addressing
health workforce shortages
96 6.1. A comprehensive change in the organisation of
health care in Estonia
Milestone Entry into force of the Decrees of the Minister of Health
and Labour amending the reimbursement system for
doctors and pharmacists
99a 6.2.a Construction of
TERVIKUM Milestone
Signature of the contract for the construction of
TERVIKUM
108 6.3. Strengthening primary
health care Milestone
Entry into force of amendments to the Health Services
Organisation Act
109 6.4. Renewal of the eHealth
Governance Milestone
Approval of the eHealth Governance Framework and its
implementation roadmap
116 6.7. Extending the duration of unemployment insurance
benefits
Milestone Entry into force of the amendments to the
Unemployment Services and Benefits Act and the
Unemployment Insurance Act
118 6.8. Long-term care Milestone Action Plan on an integrated care model
6468/26 ADD 1 66
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure (Reform
or Investment) Milestone /
Target Name
122 6.9. Reducing gender pay
gap Milestone Digital gender pay gap tool
Instalment
Amount EUR 142 977 720
Fourth Instalment (non-repayable support):
Sequential
Number
Related Measure (Reform
or Investment) Milestone
/Target Name
2 1.1. Digital transformation in
enterprises Target Award of grants
12
1.4. Skills reform for the
digital transformation of
businesses Target Enrolment in training activities
17
1.5 Supporting the
competitiveness of
enterprises in foreign
markets
Milestone Procurement of studies
29 2.3. Green technology
development programme Milestone
Set up of the Green Technologies Development
Programme
35 2.5. Resource efficient green
technologies Target
Number of projects awarded grants following the call for
proposals
43a 2.8 Supply security
investment support Milestone Publication of the call for proposals for grants
55
3.5. Reconfiguration of basic
digital services and safe
transition to cloud
infrastructure
Target Deployment of national private cloud infrastructure by
public authorities
56
3.5. Reconfiguration of basic
digital services and safe
transition to cloud
infrastructure
Milestone Extension of the cloud infrastructure to the data embassy
84a 5.2.a Multifunctional work
vessel Milestone Contract signed for building of the vessel
86a 5.3.a Construction of the
Rail Baltic viaducts and
terminal
Milestone Works contracts for the construction of Rail Baltic
viaducts
96a
6.1 A comprehensive change
in the organisation of health
care in Estonia Milestone
Entry into force of the Decree of the Minister of Health and
Labour and the amendment to the Health Services
Organisations Act establishing the reimbursement system
for nurses
97 6.1. A comprehensive change in the organisation of
health care in Estonia
Target Admission to nursing training
121 6.9. Reducing gender pay
gap Milestone
Adoption of the Welfare Development Plan 2023-2030 by
the government
123 6.9. Reducing gender pay
gap Milestone Digital gender pay gap tool
125 8.1 Facilitating the
development of renewable
energy sources
Milestone Publication of the call for proposals to support local
authorities
126 8.1 Facilitating the
development of renewable
energy sources
Milestone Entry into force of the amendments to the relevant laws
streamlining permitting, planning and environmental
impact assessment processes
6468/26 ADD 1 67
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure (Reform
or Investment) Milestone
/Target Name
129
8.2 Programme to increase
the access of renewable
energy production to the
electricity distribution
network
Milestone Signature of the co-financing agreement for electricity
distribution network
131 8.3 Increasing production
and uptake of sustainable
biogas and biomethane
Milestone Call for applications for grants to support the uptake of
biomethane
Instalment
Amount EUR 142 977 720
Fifth Instalment (non-repayable support):
Sequential
Number
Related Measure (Reform
or Investment)
Milestone
/Target Name
4 1.2. Development of e-
construction Milestone
Adoption of international standards and best practices for
the use of digital technologies in construction
6 1.2 Development of e-
construction Target Projects for digital construction tools
14 1.4. Skills reform for the
digital transformation of
businesses
Target Number of curriculums of training registered and
qualification standards for ICT specialists registered
39a 2.6 Green Fund Milestone Completion of the investment by the Ministry of
Economic Affairs and Communication
43
2.7 Creating opportunities for
the uptake of renewables-
based green hydrogen
technologies
Target Grant agreements signed for projects in renewables-based
green hydrogen technologies
43c 2.8 Supply security
investment support Target Confirmations from authorities accepting the final reports
46
3.1 Creation and development of a centre of excellence for
data governance and open data Target Publication of datasets
50 3.3 Development of event
services and digital gateway
for entrepreneurs
Target IT developments online
58
3.5. Reconfiguration of basic
digital services and safe
transition to cloud
infrastructure
Target Security testing by the Information System Authority
59 3.6. The strategic analysis of
money laundering and
terrorist financing in Estonia
Milestone Entry into force of legal act(s)
72 4.4. Boosting the green
transition in the energy
economy
Milestone Entry into force of legal acts
80a 4.8 Boosting offshore wind
farms development Milestone
Contractors for the radar and passive radar system/sensors
selected and contracts signed
91 5.4 Construction of the
Tallinn Old Port tram line Milestone New tramway line
93 5.5.
Municipalities’investmen
ts in bike- and walkways
Target Construction works on bike- and walkways delivered
94 6.1. A comprehensive change
in the organisation of health
care in Estonia
Milestone Entry into force of the Government Order on the Hospital
network development roadmap
6468/26 ADD 1 68
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure (Reform
or Investment) Milestone
/Target Name
100a 6.2.a Construction of
TERVIKUM Milestone TERVIKUM constructed
115 6.6 Providing labour market
measures to reduce youth
unemployment
Target Number of young people enrolled in labour market related
measures
120 6.8. Long-term care Milestone Entry into force of the legislative amendments of the
support system for children with higher care needs
127 8.1 Facilitating the
development of renewable
energy sources
Milestone Governmental decision establishing priority development
areas for wind energy
128 8.1 Facilitating the
development of renewable
energy sources
Target Support to local authorities
133 8.3 Increasing production and
uptake of sustainable biogas
and biomethane
Milestone Action plan for the production and use of biogas and
biomethane
Instalment
Amount EUR 190 636 960
Sixth Instalment (non-repayable support):
Sequential
Number
Related Measure
(Reform or Investment) Milestone
/Target Name
3 1.1. Digital transformation in
enterprises Target Award of grants
9 1.3. Development of digital
waybills services Target Confirmations from authorities accepting the final reports
13 1.4 Skills reform for the
digital transformation of
businesses
Target Participation in training activities
18 1.5 Supporting the
competitiveness of
enterprises in foreign markets
Target Strategies published and missions carried out
20 1.5 Supporting the
competitiveness of
enterprises in foreign markets
Target Number of business centres opened
27 2.2 Green skills to support
the green transition of
enterprises
Target Training certificates issued
31 2.3 Green technologies
development programme Target
Number of clusters and startups supported through the
Green Technology Development Programme
33 2.4. Modernisation of the
business models in
manufacturing companies
Target Number of projects supported
36 2.5 Resource efficient green
technologies Target Confirmations from authorities accepting the final reports
40a 2.6 Green Fund Target Legal financing agreements signed with equity/venture
capital funds
48 3.2 Development of event
services for individuals Target Online personal life event services
52 3.4. #Bürokratt programme
(national virtual assistant) Target Bürokratt virtual assistant on public authorities’ websites
60
3.7 Information system for
strategic analysis of money
laundering and terrorist
financing
Milestone ICT system for strategic analysis
6468/26 ADD 1 69
ANNEX ECOFIN 1A EN
Sequential
Number
Related Measure
(Reform or Investment) Milestone
/Target Name
62 3.8. Construction of very
high capacity broadband
networks
Target Number of very high capacity broadband network projects
confirmed
66 4.2 Support for the
renovation of multi-
apartment buildings
Target Multi-apartment buildings with improved energy
performance
69a 4.3 Support for the
renovation of small
residential buildings
Target Small residential buildings with improved energy
performance
73 4.4. Boosting the green
transition in the energy
economy
Milestone Adoption of the National Development Plan of the Energy
Sector by the Government
75 4.5 Programme to increase the
capacity of the electricity
transmission network
Target Additional grid capacity
77 4.6 Programme to boost
energy production in
industrial areas
Target Additional connection capacity for renewable electricity
production
80 4.7 Pilot Energy Storage
Programme Target
Additional heat and electricity storage capacity resulting
from investment support
80c 4.8 Boosting offshore wind
farms development Milestone
Removal of the height restriction on offshore wind turbines in the Gulf of Riga and Estonian islands Hiiumaa,
Saaremaa, Vormsi
85a 5.2.a Multifunctional work
vessel Milestone Multifunctional work vessel built
87a 5.3.a Construction of the Rail
Baltic viaducts and terminal Milestone
Viaducts constructed and disbursement made for
construction work of terminal
88b 5.3.b Renovation of a section of the railway from Rapla to
Lelle
Milestone Renovation of railway section
98
6.1 A comprehensive change
in the organisation of health
care in Estonia Milestone
Entry into force of the Ministerial Regulation amending the
agreement between the Ministry of Social Affairs and the
University of Tartu on the shortage of doctors in certain
specialisations
130
8.2 Programme to increase the access of renewable
energy production to the electricity distribution
network
Target Additional 160 MW capacity available
134 8.3 Increasing production and
uptake of sustainable biogas
and biomethane
Target Installation of new biomethane production capacity
Instalment
Amount EUR 190 636 960
6468/26 ADD 1 70
ANNEX ECOFIN 1A EN
SECTION 3: ADDITIONAL ARRANGEMENTS
1. Arrangements for monitoring and implementation of the recovery and resilience plan
The monitoring and implementation of the Estonian recovery and resilience plan shall take place in
accordance with the following arrangements:
The Ministry of Finance as the lead ministry and the State Shared Service Center shall ensure overall coordination, monitoring and implementation of the recovery and resilience plan. The State
Shared Service Center shall perform the functions of the managing authority. The State Budget
Department in the Ministry of Finance in cooperation with the State Shared Service Center shall
carry out the tasks related to monitoring and evaluation.
Sectoral ministries and agencies shall perform the responsibilities assigned to them, related to the
implementation of the plan. Their services shall also support the monitoring of the progress of the
projects under their competency and maintain close cooperation with the State Shared Service
Center and the Ministry of Finance. To this end, the existing Structural Funds Operating System
(SFOS) shall be used to record all the data related to implementation and monitoring of the plan.
The Financial Control Department of the Ministry of Finance, the audit authority, shall carry out
regular audits of the management and control systems put in place. It shall also prepare a summary
of the audits carried out for requests for payments. The Audit Authority shall also host the Anti-
Fraud Co-ordinating Service.
All national and external sources shall be budgeted together in sector-specific programmes allowing
transparent monitoring of sectoral funding and allowing the identification of risks and prevention of
double funding.
2. Arrangements for providing full access by the Commission to the underlying data
The State Shared Service Center as the managing authority shall hold the responsibility for
submitting requests for payment to the European Commission and for drawing up the management
declaration by which it certifies that the funds have been used for their intended purpose, that the
information is complete, accurate and reliable and that the control system provides the necessary
assurance. In addition, monitoring and evaluation shall also be ensured by the Ministry of Finance
in cooperation with the State Shared Service Center.
Data related to the implementation and monitoring of the plan shall be stored in the existing
integrated information system, the Structural Funds Operating System (SFOS). The SFOS is
adapted to the requirements under Regulation (EU) 2021/241 for data collection, progress reports
and requests for payment, including to collect indicators and other information necessary to
demonstrate and report the achievement of milestones and targets. The SFOS shall be used by all
actors involved in the implementation of the plan. The information in the SFOS shall continuously
be updated on the progress and results of the plan including deficiencies identified and all corrective
actions taken.
6468/26 ADD 1 71
ANNEX ECOFIN 1A EN
In accordance with Article 24(2) of Regulation (EU) 2021/241, upon completion of the relevant
agreed milestones and targets in Section 2.1 of this Annex, Estonia shall submit to the Commission a
duly justified request for payment of the financial contribution. Estonia shall ensure that, upon
request, the Commission has full access to the underlying relevant data that supports the due
justification of the request for payment, both for the assessment of the request for payment in
accordance with Article 24(3) of Regulation (EU) 2021/241 and for audit and control purposes.
6468/26 ADD 1 72
ANNEX ECOFIN 1A EN
EN 1 EN
ADDENDUM TO THE RECOVERY AND RESILIENCE PLAN
Contents
PART 1: INTRODUCTION TO THE ADDENDUM ........................................................................................ 2
1. General objective ........................................................................................................................ 2
2. Justification for the addendum ................................................................................................... 2
PART 2: DESCRIPTION OF ADDITIONAL AND MODIFIED REFORMS AND INVESTMENTS ........................ 2
Name of the modified component ......................................................................................................... 2
PART 3: COMPLEMENTARITY AND IMPLEMENTATION OF THE PLAN .................................................... 4
1. Consistency with other initiatives ............................................................................................... 5
2. Complementarity of funding ....................................................................................................... 5
3. Effective implementation ........................................................................................................... 5
4. Consultation process of stakeholders ......................................................................................... 5
5. Control and audit ........................................................................................................................ 5
6. Communication ........................................................................................................................... 5
PART 4: OVERALL COHERENCE AND IMPACT OF THE PLAN ................................................................... 5
1. Coherence: .................................................................................................................................. 5
2. Gender equality and equal opportunities for all: ....................................................................... 5
3. Strengthening economic, social and institutional resilience: ..................................................... 5
4. Comparison with the investment baseline: ................................................................................ 5
EN 2 EN
PART 1: INTRODUCTION TO THE ADDENDUM
1. General objective
Following the latest amendment of the Estonian RRP, the reforms and investments
implemented by the Estonia continue to be affected by the rapid pace of technological change,
including the widespread adoption of new tools such as artificial intelligence, which has
rendered parts of the training content outdated. Furthermore, the needs and expectations of
participants have evolved significantly, with a stronger preference for more flexible, tailored,
and practical learning formats. As a result, participation interest in the existing training
programmes has declined, limiting their intended impact and necessitating minor revisions.
2. Justification for the addendum
Article [21]: an amendment or submission of a new plan due to the plan, including relevant
milestones and targets, being no longer achievable because of objective circumstances.
PART 2: DESCRIPTION OF ADDITIONAL AND MODIFIED
REFORMS AND INVESTMENTS
Name of the modified component
Investment/ reform CID
reference
Reform 1.4
Investment/ reform name Skills reform for the digital transformation of
businesses
Type of change compared to
CID
modified
Legal base of the change
(select at least one) ☐ Article 14(2) – loan request
☐ Article 18(2) – update of the maximum financial
contribution
☒ Article 21 – amendment due to objective circumstances
☐ [Article 21a – REPowerEU resources]
☐ [Article 21b – new transfers]
☐ None of the above, correction of clerical error
Elements modified (only for
modified measures)
☐ Component / Measure description
☒Milestones and targets
☐ Estimated cost
☐ Green and digital tagging
☐ DNSH self-assessment
EN 3 EN
Description and justification of the change
Within the RRF reform - Skills reform for the digital transformation of businesses measure,
it has become evident that the participation in training activities target is currently not
achievable.
Compared to the period when the measure was originally designed, significant changes have
occurred in both the economic environment and the ICT sector.
The economic backdrop of 2023–2024 has been exceptionally challenging, leading
companies to prioritise short-term operational continuity over staff development. Many
firms, particularly in manufacturing and industry, responded by cutting jobs or freezing
hiring; for example, manufacturing employment declined by approximately 6% from its
2022 peak by early 2024. Under these conditions, SMEs and larger employers alike have
limited capacity to release employees for lengthy training programmes, even when the
training itself is provided free of charge. Lowering the participation target therefore reflects
a temporary but material absorption constraint and aligns expectations with what companies
can realistically support under current economic stress.
At the same time, developments in the ICT sector have diverged from earlier forecasts.
According to OSKA ICT sector monitoring, the previously projected growth in demand for
ICT specialists has not materialised to the expected extent, and demand has instead
stabilised. This has reduced both individual and employer-driven interest in further training
and large-scale retraining programmes.
In practice, participation rates in the training programmes have remained below the procured
training volume, pointing to saturation in the training market.
Similar training opportunities targeting the same audience are currently offered in Estonia
through multiple funding sources and measures (ESF/ERDF, Recovery and Resilience
Facility, and Just Transition Fund measures), which further limits effective uptake.
The rapid emergence and diffusion of AI has also influenced employer behaviour. While this
has been flexibly considered during project implementation, many companies have begun
adopting AI solutions based on their own company-specific needs. As a result, employers
increasingly prefer their employees to participate in internal company-specific AI training
and development activities tailored to their specific business context over external,
standardised training programmes.
Finally, completion rates in ICT training have been highly variable, with dropout rates
ranging from 3% to 37%. The reasons for discontinuation vary: the ICT field is demanding,
and participants have often underestimated the level of commitment required for long-term
retraining programmes. These trainings were intentionally designed to include intensive and
in-depth learning pathways, reflecting the programme’s focus on meaningful and sustainable
skill transitions into specialist roles rather than maximising completion figures alone.
Maintaining a clear quality threshold with regard to training scope, duration and completion
therefore remains essential, and a reduced participation target supports this objective.
Due to the reasons outlined above, we propose as a solution to reduce the target goal from
2000 to 1818.
Modified elements Current version Amended version
Component and / or
measure
description
- -
EN 4 EN
Milestones and
targets
T13
Name: The participation in
training activities
Quantitative indicator for
T13: Training certificates
Goal:
2000
Description of T13: Number of certificates of
graduation or certificates of
participation issued for
training activities supported
under this measure capacity.
T13
Name: The participation in
training activities
Quantitative indicator for T13:
Number of confirmed
participations
Goal:
1818
Description of T13: Number of confirmed participations
in training activities supported
under this measure.
Estimated cost - -
Green and digital
tagging
- -
DNSH self-
assessment )
- -
CID reference for the affected
Measures Component 1 (investment 1.5); Component 2 (investment 2.2;
2.3); Component 3 (reform 3.6); Component 6 (reform 6.1)
Legal base of the change (select at
least one)
Article 14(2) – loan request
☐ Article 18(2) – update of the maximum financial contribution
☒ Article 21 – amendment due to objective circumstances
☐ Article 21a – REPowerEU non-repayable financial support (ETS
revenue)
☐ Article 21b (2) – BAR transfers
☒ None of the above, correction of clerical error
Elements modified (only for
modified measures)
☐ Component / Measure description
☒Milestones and targets
☐ Estimated cost
☐ Green and digital tagging (potentially relevant, because there is a
substantive change to the underlying measure)
☐ DNSH self-assessment
PART 3: COMPLEMENTARITY AND IMPLEMENTATION OF THE
PLAN
EN 5 EN
1. Consistency with other initiatives
2. Complementarity of funding
3. Effective implementation
4. Consultation process of stakeholders
5. Control and audit
6. Communication
The previous indications remain unchanged.
PART 4: OVERALL COHERENCE AND IMPACT OF THE PLAN
1. Coherence:
2. Gender equality and equal opportunities for all:
3. Strengthening economic, social and institutional resilience:
4. Comparison with the investment baseline:
The previous indications remain unchanged.
Suur-Ameerika 1 / 10122 Tallinn / 611 3558 / [email protected] / www.rahandusministeerium.ee
registrikood 70000272
Riigikantselei
„Taaste- ja vastupidavuskava lisa“
ja toetuse riigisisese väljamaksete
korra kinnitamine
Austatud härra riigisekretär
Esitame Vabariigi Valitsuse istungile eelnõu „„Taaste- ja vastupidavuskava lisa“ ja toetuse
riigisisese väljamaksete korra kinnitamine“.
Taastekava koostati esmakordselt 2021.a. sügisel, kui lepiti Euroopa Komisjoniga kokku
reformid ja investeeringud koos siduvate eesmärkide ja ajakavaga RRF toetuse kasutamiseks.
2023.a. alguses tehti seoses rahastu mahu vähendamise ja REPowerEU toetuse lisandumisega
kavale muudatuste lisa, mis kiideti Euroopa Liidu Nõukogu poolt heaks mais 2023.a. 2025.a.
sügisel ning 2026.a. algul muudeti Taastekava seoses muutunud olude – sõja, inflatsiooni ja
majanduslanguse – mõjuga ning Euroopa Komisjoni 2025. a juunis antud lihtsustamisjuhiste
rakendamiseks. Kuna Taastekava elluviimise ja tulemuste Euroopa Komisjonile
raporteerimise lõpptähtaeg on august 2026.a., siis on tarvilik Taastekava veelkord täiendavalt
korrigeerida, et kõik kavas sisalduvad siduvad kokkulepped ja tulemused oleks võimalik
tähtaegselt saavutada ning tagada sellega Eestile kogu RRF toetuse väljamaksmine Euroopa
Komisjoni poolt 2026.a. lõpuks.
RRF on tulemuspõhine rahastamisinstrument, mille kohaselt teeb Euroopa Komisjon
väljamakseid liikmesriikidele üksnes Taastekavas kokkulepitud investeeringute/reformide
tulemuste (vahe-eesmärgid ja sihid) saavutamise alusel. Euroopa Komisjonilt laekub toetus
rahastamiskokkuleppes määratud kindlasummaliste maksetena, mis ei ole otseses vastavuses
riigisiseselt investeeringute/reformide rakendamisel tekkinud tegelike kuludega. Kuna Eestile
on laekumas Euroopa Komisjonilt 2026.a. lõpus veel viimased kaks makset ning RRF-i
rakendamise lõpptähtaeg on peagi saabumas, peame perioodi lõppedes tagama riigisiseselt
tulude ja kulude vastavuse riigisiseses väljamaksete korras.
Lugupidamisega
(allkirjastatud digitaalselt)
Jürgen Ligi
rahandusminister
Meie 25.05.2026 nr 1.1-10.1/2254-1
2
Lisad:
1. Protokolli kantava otsuse „„Taaste- ja vastupidavuskava lisa“ ja toetuse riigisisese
väljamakse korra kinnitamine“ eelnõu
2. Protokolli kantava otsuse „„Taaste- ja vastupidavuskava lisa“ ja toetuse riigisisese
väljamakse korra kinnitamine“ eelnõu seletuskiri
3. Protokolli kantava otsuse „„Taaste- ja vastupidavuskava lisa“ ja toetuse riigisisese
väljamakse korra kinnitamine“ eelnõu lisa „Addendum to the Recovery and Resilience Plan“
4. Protokolli kantava otsuse „„Taaste- ja vastupidavuskava lisa“ ja toetuse riigisisese
väljamakse korra kinnitamine“ eelnõu lisa „Nõukogu rakendusotsuse (CID) lisa“
Rita Tubarik 5464 0212
Lisa 2 Taaste- ja vastupidavuskava alusel laekuva toetuse riigisisene väljamaksete kord
# Meetme nimi
R/
I
M/
T # Eesmärk/ siht Q a
Siseriiklik
hind (al.
28.05.26)*
MKM 1.1 Investeering
arengusihtide
saavutamisse
I M 1 Projektikonkursi
ettevalmistamine
koos
hindamiskriteeriu
mide ja toetuse
andmise
tingimustega
Q2 2022 11 600 000
MKM 1.1 Investeering
arengusihtide
saavutamisse
T 2 Toetuste
määramine
Q4 2023 23 200 000
MKM 1.1 Investeering
arengusihtide
saavutamisse
T 3 Toetuste
määramine
Q4 2025 23 200 000
KLIM 1.2 E-ehituse
arendamine
I M 4 Ehituse andmete
klassifitseerimiss
üsteemi
juurutamine
Q4 2024 2 250 000
KLIM 1.2 E-ehituse
arendamine
M 5 Avalike teenuste
kättesaadavus e-
ehituse
platvormil
Q4 2025 0
KLIM 1.2 E-ehituse
arendamine
T 6 Digitaalse
ehitustarkvara
projektid
Q4 2025 6 750 000
MKM 1.3 E-veoselehe
teenuse
arendamine
I T 7 Elektroonilise
kaubaveoteabe
(eFTI)
platvormide
arendamine
Q2 2023 1 500 000
MKM 1.3 E-veoselehe
teenuse
arendamine
T 8 E-veoselehe
(eCMR) liidese
arendustööd
Q4 2024 0
MKM 1.3 E-veoselehe
teenuse
arendamine
T 9 Lõpparuannete
vastuvõtmist
kinnitanud
asutuste arv
Q2 2026 4 500 000
MKM 1.3 E-veoselehe
teenuse
arendamine
M 10 E-veoselehtede
väljatöötamise ja
kasutuselevõtu
järelhindamine
Q2 2026 0
HTM 1.4 Oskuste reform
ettevõtete
digipöördeks
R M 11 Digioskuste
arendamise
toetamise
tingimusi
sisaldavate
teiseste
õigusaktide
jõustumine
Q2 2022 2 000 000
HTM 1.4 Oskuste reform
ettevõtete
digipöördeks
T 12 Koolitustele
registreerumine
Q4 2023 2 000 000
*meetme lõpptulemuse eest tehtava toetuse väljamakse suuruseks on reformi/investeeringu eelarve
piires 31.08.2026 seisuga tekkinud seni laekumata nõuete maht.
HTM 1.4 Oskuste reform
ettevõtete
digipöördeks
T 13 Osavõtt
koolitustest
Q2 2026 2 000 000
HTM 1.4 Oskuste reform
ettevõtete
digipöördeks
T 14 Registreeritud
IKT-
spetsialistide
koolitusprogram
mide ja
kvalifikatsioonist
andardite arv
Q4 2024 4 000 000
HTM 1.4 Oskuste reform
ettevõtete
digipöördeks
T 15 IKT-
spetsialistide
kvalifikatsioonist
a
ndardite
läbivaatamine
Q4 2024 0
VÄM 1.5
.1
Ettevõtete
konkurentsivõime
toetamine
välisturgudel-
katusreform
R M 16 Strateegiate
väljatöötamise
ettevalmistamine
Q2 2022 3 500 000
VÄM 1.5
.1
Ettevõtete
konkurentsivõime
toetamine
välisturgudel-
katusreform
M 17 Uuringute
tellimine
Q2 2024 3 500 000
VÄM 1.5
.1
Ettevõtete
konkurentsivõime
toetamine
välisturgudel-
katusreform
T 18 Riigi- ja
regioonipõhiste
ekspordistrateegi
ate arv
Q2 2026 11 085 000
VÄM 1.5
.2
Ettevõtete
konkurentsivõime
toetamine
välisturgudel-
katusreform
R M 19 Ettevalmistav
analüüs
ettevõtluskeskust
e sisustuse ja
asukoha
kindlaksmäärami
seks
Q2 2022 5 500 000
VÄM 1.5
.2
Ettevõtete
konkurentsivõime
toetamine
välisturgudel-
katusreform
T 20 Avatud
ettevõtluskeskust
e arv
Q2 2026 5 500 000
VÄM 1.5
.3
Ettevõtete
konkurentsivõime
toetamine
välisturgudel-
katusreform
R M 21 Löögirühmade
loomine ja
sihtkohtade
valimine
ülemaailmsete
digilähetuste
jaoks
Q2 2022 4 085 000
VÄM 1.5
.3
Ettevõtete
konkurentsivõime
toetamine
välisturgudel-
katusreform
T 22 Globaalsete
löögirühmade
lähetuste arv ja
nende
suurürituste arv,
kus Eesti on
virtuaallavade
kaudu esindatud
Q2 2026 0
KLIM 2.1 Ettevõtete
rohepööre
R M 23 Rakkerühma ja
töörühmade
loomine
Q4 2021 0
KLIM 2.1 Ettevõtete
rohepööre
R M 24 Ringmajanduse
tegevuskava
vastuvõtmine
rohepöörde
rakkerühmas
Q4 2022 0
HTM 2.2 Roheoskused
ettevõtete
rohepöörde
toetamiseks
I M 25 Teiseste
õigusaktide
jõustumine
Q2 2022 3 000 000
HTM 2.2 Roheoskused
ettevõtete
rohepöörde
toetamiseks
T 26 Oskuste
täiendamise ja
ümberõppemood
ulite arv
Q4 2024 0
HTM 2.2 Roheoskused
ettevõtete
rohepöörde
toetamiseks
T 27 Koolitustunnistus
ed
Q2 2026 12 000 000
KLIM 2.3 Rohetehnoloogiate
arendusprogrammi
d
I M 28 Arendusprogram
mi kavandamise
ja koostamise
töörühma
moodustamine
Q4 2021 2 095 000
KLIM 2.3 Rohetehnoloogiate
arendusprogrammi
d
M 29 Rohetehnoloogia
te
arendusprogram
mi
käivitamine
Q2 2024 2 095 000
KLIM 2.3 Rohetehnoloogiate
arendusprogrammi
d
T 30 Rohetehnoloogia
te
arendusprogram
mi
kaudu toetatavate
klastrite arv
Q2 2026 0
KLIM 2.3 Rohetehnoloogiate
arendusprogrammi
d
T 31 Rohetehnoloogia
arendusprogram
mi raames
toetatud klastrite
ja idufirmade arv
Q2 2026 4 190 000
MKM 2.4 Tootmisettevõtete
ärimudeli
muutused
I M 32 Toetuse andmise
tingimusi
sätestava ministri
käskkirja
jõustumine
Q2 2022 1 800 000
MKM 2.4 Tootmisettevõtete
ärimudeli
muutused
T 33 Lõpparuannete
vastuvõtmist
kinnitanud
asutuste arv
Q2 2026 7 200 000
KLIM 2.5 Tööstusettevõtete
ressursitõhusate
rohetehnoloogiate
edendamine
I 34 34 Konkursikutse
avaldamine
Q2 2022 4 800 000
REM 2.5 Bioressurside
väärindamine
I M 34 Konkursikutse
avaldamine
Q2 2022 5 760 000
KLIM 2.5 Tööstusettevõtete
ressursitõhusate
T 35 Projektikonkursi
tulemusel
Q4 2023 9 600 000
rohetehnoloogiate
edendamine
sõlmitud
lepingute arv
REM 2.5 Bioressurside
väärindamine
T 35 Projektikonkursi
tulemusel
sõlmitud
lepingute arv
Q4 2023 11 520 000
KLIM 2.5 Tööstusettevõtete
ressursitõhusate
rohetehnoloogiate
edendamine
T 36 Lõpparuannete
vastuvõtmist
kinnitanud
asutuste arv
Q2 2026 9 600 000
REM 2.5 Bioressurside
väärindamine
T 36 Projektide arv Q2 2026 6 520 000
MKM 2.6 Rohefond I M 37 MKM ning
SmartCapi
vahelise lepingu
allakirjutamine
Q4 2021 100 000 000
MKM 2.6 Rohefond M 38 Investeerimispoli
itika dokumendi
vastuvõtmine
SmartCapi poolt
Q4 2021 x
MKM 2.6 Rohefond T 39a Investeeringu
elluviimine
Majandus- ja
Kommunikatsioo
niministeeriumi
poolt
Q3 2025 x
MKM 2.6 Rohefond T 40a Õiguslikud
finantseerimislep
ingud, mis on
sõlmitud
omakapitali-
/riskikapitalifond
idega
Q2 2026 x
KLIM 2.7 Vesiniku
terviktehnoloogiat
e kasutuselevõtu
edendamine
I M 41 Toetuse andmise
tingimusi
sätestava
ministri käskkirja
jõustumine
Q4 2022 12 500 000
KLIM 2.7 Vesiniku
terviktehnoloogiat
e kasutuselevõtu
edendamine
M 42 Tehnoloogiad ja
seadmed
terviklike
rohevesiniku
väärtusahelate
loomiseks
Q3 2025 0
KLIM 2.7 Vesiniku
terviktehnoloogiat
e kasutuselevõtu
edendamine
T 43 Toetuste
lepingud
allkirjastatud
projektide jaoks
vähemalt 11
miljoni euro
Q2 2026 0
MKM 2.8 Varustuskindluse
investeeringute
toetusmeede
I M 43a toetuse andmise
tingimuste
avaldamine
Q4 2023 4 000 000
MKM 2.8 Varustuskindluse
investeeringute
toetusmeede
T 43b avatud vooru
tulemusel toetust
saanud projektide
arv
Q4 2024 0
MKM 2.8 Varustuskindluse
investeeringute
toetusmeede
T 43c Lõpparuannete
vastuvõtmist
kinnitavate
asutuste arv
Q2 2026 16 000 000
JDM 3.1 Andmehalduse ja
avaandmete
oivakeskuse
loomine ja
väljaarendamine
R M 44 Andmehaldusme
eskonna
moodustamine
statistikaametis,
MKMis ning
Riigi
Infosüsteemi
Ametis
Q4 2021 3 570 000
JDM 3.1 Andmehalduse ja
avaandmete
oivakeskuse
loomine ja
väljaarendamine
T 45 Andmekvaliteedi
parandamise
projektide
lõpuleviimine
Q2 2025 0
JDM 3.1 Andmehalduse ja
avaandmete
oivakeskuse
loomine ja
väljaarendamine
T 46 Andmekogude
avaldamine
Q4 2025 8 320 000
JDM 3.2 Eraisikutele
sündmusteenuste
ja etteaimavate
teenuste
väljaarendamine
R T 47 Eraisikute
elusündmusteenu
ste ja/või
etteaimavate
teenuste
käivitamine
Q4 2022 2 456 000
JDM 3.2 Eraisikutele
sündmusteenuste
ja etteaimavate
teenuste
väljaarendamine
T 48 Veebipõhised
teenused isiklike
eluürituste jaoks
Q4 2025 9 824 000
MKM 3.3 Ettevõtja
sündmusteenuste
ja digivärava
väljaarendamine
R T 49 Ärisündmustel
põhinevate
teenuste ja
digivärava
rakendamisele
kaasa aitavate
IT-arenduste
kasutuselevõtt
Q4 2022 2 080 000
MKM 3.3 Ettevõtja
sündmusteenuste
ja digivärava
väljaarendamine
T 50 IT arendused
veebis
Q4 2025 18 720 000
JDM 3.4 #Bürokrati
programm (riikliku
virtuaalassistendi
platvorm ja
ökosüsteem)
I T 51 Juurdepääs
digitaalsetele
avalikele
teenustele
virtuaalassistendi
platvormi kaudu
Q2 2022 3 493 333
JDM 3.4 #Bürokrati
programm (riikliku
virtuaalassistendi
platvorm ja
ökosüsteem)
T 52 Bürokratt –
virtuaalne
assistent avaliku
sektori
veebisaitidel
Q4 2025 5 736 667
JDM 3.4 #Bürokrati
programm (riikliku
virtuaalassistendi
T 53 Juurdepääs
digitaalsetele
avalikele
teenustele
Q4 2025 0
platvorm ja
ökosüsteem)
virtuaalassistendi
platvormi
kaudu
JDM 3.5 Digiriigi
baasteenuste
ümberkorraldamin
e ning turvaline
pilvetaristule
üleminek
I M 54 Keskselt osutatud
/ jagatud
ITbaasteenuste
väljaarendamine
Q3 2022 10 707 500
JDM 3.5 Digiriigi
baasteenuste
ümberkorraldamin
e ning turvaline
pilvetaristule
üleminek
T 55 Riikliku
privaatpilvetarist
u kasutuselevõtt
avaliku sektori
asutuste poolt
Q4 2023 7 138 333
JDM 3.5 Digiriigi
baasteenuste
ümberkorraldamin
e ning turvaline
pilvetaristule
üleminek
M 56 Pilvetaristu
laiendamine
andmesaatkonnal
e
Q4 2023 10 707 500
JDM 3.5 Digiriigi
baasteenuste
ümberkorraldamin
e ning turvaline
pilvetaristule
üleminek
T 57 Elutähtsate
süsteemide
üleviimine
pilvelahendusega
andmesaatkonda
Q4 2024 0
JDM 3.5 Digiriigi
baasteenuste
ümberkorraldamin
e ning turvaline
pilvetaristule
üleminek
T 58 Riigiasutuste
infosüsteemide
keskne
turvatestimine
Q4 2024 10 776 666
RM 3.6 Rahapesu ja
terrorismi
rahastamise
strateegilise
analüüsi uuele
tasemele viimine
Eestis
R M 59 Õigusaktide
muudatuste
jõustumine
Q4 2024 400 000
RM 3.7 Rahapesu ja
terrorismi reaalaja
strateegilise
analüüsi süsteem
I M 60 Strateegilise
analüüsi IKT-
süsteem
Q2 2026 3 500 000
JDM 3.8 Väga suure
läbilaskevõimega
lairibavõrkude
ehitamine
I T 61 Väga suure
läbilaskevõimega
lairibavõrgu
kasutuselevõtt
uutes kohtades
Q4 2024 0
JDM 3.8 Väga suure
läbilaskevõimega
lairibavõrkude
ehitamine
T 62 Väga suure
võimsusega
lairibaühenduse
projektide
kinnitatud arv
Q4 2025 24 290 000
KLIM 4.1 Energiatõhustamis
e ja tervikliku
rekonstrueerimise
soodustamine
R M 63 Koostöölepingu
sõlmimine, et
sätestada SA
Kredex /
Enterprise Eesti
ja maakondlike
Q4 2022 0
arenduskeskuste
vahelise koostöö
tingimused.
KLIM 4.1 Energiatõhustamis
e ja tervikliku
rekonstrueerimise
soodustamine
R M 64 Kasutusele on
võetud
digitaalsed
vahendid,
millega
hõlbustada
juurdepääsu
rekonstrueerimist
käsitlevale
teabele,
sealhulgas
visualiseerida
rekonstrueerimis
e tulemusi ja
hinnata
rekonstrueerimis
kulusid.
Q4 2024 0
KLIM 4.2 Korterelamute
rekonstrueerimise
toetamine
I M 65 Korterelamute
rekonstrueerimist
oetuse
projektikonkurssi
de
väljakuulutamine
Q2 2022 8 934 000
KLIM 4.2 Korterelamute
rekonstrueerimise
toetamine
T 66 Suurema
energiatõhususeg
a korterelamud
Q2 2026 35 736 000
KLIM 4.2 Korterelamute
rekonstrueerimise
toetamine
T 67 Kasvuhoonegaasi
de heite
hinnanguline
vähenemine
aastas
Q2 2026 0
KLIM 4.3 Väikeelamute
rekonstrueerimise
toetamine
I M 68 Renoveerimistoet
use
projektikonkurssi
de
väljakuulutamine
Q2 2022 6 260 000
KLIM 4.3 Väikeelamute
rekonstrueerimise
toetamine
T 69 Suurema
energiatõhususeg
a väikeelamud
Q4 2024 0
KLIM 4.3 Väikeelamute
rekonstrueerimise
toetamine
T 69a Suurema
energiatõhususeg
a väikeelamud
Q1 2026 25 040 000
KLIM 4.4 Energiamajanduse
s rohepöörde
hoogustamine
R M 70 Valitsuse otsus
investeeringute
kohta, mis on
vajalikud
tuuleparkide
riigikaitseliste
kõrgusepiirangut
e tühistamiseks.
Q2 2021 0
KLIM 4.4 Energiamajanduse
s rohepöörde
hoogustamine
R M 71 Valitsuse otsuse
vastuvõtmine, et
kiita heaks
energiamajandus
e arengukava
koostamine ning
määrata kindlaks
Q4 2021 0
vastutajad ja
tähtajad.
KLIM 4.4 Energiamajanduse
s rohepöörde
hoogustamine
R M 72 Õigusaktide
muudatuste
jõustumine
Q4 2024 0
KLIM 4.4 Energiamajanduse
s rohepöörde
hoogustamine
R M 73 Energiamajandus
e arengukava
vastuvõtmine
valitsuses
Q4 2025 0
KLIM 4.5 Elektrivõrgu
tugevdamise
programm
I M 74 Võrguinvesteerin
gute
kaasrahastamise
lepingu
allkirjastamine
põhivõrguettevõt
jaga
Q1 2022 7 240 000
KLIM 4.5 Elektrivõrgu
tugevdamise
programm
T 75 Täiendav
taastuvenergia
liitumisvõimsus
Q2 2026 28 960 000
KLIM 4.6 Tööstusalades
taastuvelektri
tootmisseadmete
kasutuselevõtu
hoogustamise
programm
I M 76 Projektikonkursi
väljakuulutamine
tööstusaladel
energiatootmise
hoogustamiseks
Q4 2022 1 820 000
KLIM 4.6 Tööstusalades
taastuvelektri
tootmisseadmete
kasutuselevõtu
hoogustamise
programm
T 77 Taastuvenergia
tootmise jaoks on
elektrivõrgus
loodud täiendav
liitumisvõimsus.
Q2 2026 2 720 524
KLIM 4.7 Energia salvestuse
pilootprogramm
I M 78 Energiasalvestus
e
pilootprogrammi
projektikonkursi
väljakuulutamine
Q4 2022 1 920 000
KLIM 4.7 Energia salvestuse
pilootprogramm
T 79 Täiendav soojus-
ja elektrienergia
salvestusvõimsus
Q2 2026 7 680 000
KLIM 4.7 Energia salvestuse
pilootprogramm
T 80 Investeeringutoet
usest tulenev
täiendav
elektrisalvestusv
õimsus
Q2 2026 0
KAM 4.8 Avamere
tuuleparkide
arendamine
I M 80a Radari ja
passivradari
süsteemi
pakkujad välja
valitud ja
lepingud
sõlmitud
Q4 2024 13 360 000
KAM 4.8 Avamere
tuuleparkide
arendamine
M 80b radar ja
passivradar ning
andurid on
kasutusse võetud
Q1 2026 0
KAM 4.8 Avamere
tuuleparkide
arendamine
M 80c kõrguspiirang
avamere
tuulegeneraatorit
Q1 2026 53 440 000
ele Riia lahes ja
Eesti saarte
Hiiumaa,
Saaremaa ja
Vormsi
piirkonnas on
eemaldatud
KLIM 5.1 Võtame kasutusele
ohutu,
keskkonnahoidliku
,
konkurentsivõimel
ise, vajaduspõhise
ja jätkusuutliku
transpordi- ja
energiataristu
R M 81 Transpordi ja
liikuvuse
arengukava
(2021–2035)
vastuvõtmine
valitsuses
Q1 2022 0
KLIM 5.1 Võtame kasutusele
ohutu,
keskkonnahoidliku
,
konkurentsivõimel
ise, vajaduspõhise
ja jätkusuutliku
transpordi- ja
energiataristu
R M 82 Transpordi ja
liikuvuse
arengukava
(2021–2035)
keskkonnasõbrali
ku ja säästliku
transpordi
arendamise
rakendusplaani
vastuvõtmine
Q4 2022 0
KLIM 5.1 Võtame kasutusele
ohutu,
keskkonnahoidliku
,
konkurentsivõimel
ise, vajaduspõhise
ja jätkusuutliku
transpordi- ja
energiataristu
R M 83 Transpordi ja
liikuvuse
arengukava
(2021–2035)
rakendamine
Q2 2026 0
KLIM 5.2
.a
Multifunktsinaalne
töölaev
I M 84a leping töölaeva
ehitamiseks
allkirjastatud
Q1 2024 3 600 000
KLIM 5.2
.a
Multifunktsinaalne
töölaev
T 85a töölaev üle antud Q2 2026 18 959 476
KLIM 5.3
.a
Rail Baltic
viaduktid ja
Ülemiste terminali
osalised ehitustööd
I T 86a Rail Balticu
viaduktide
esitamiseks
vajalikud
lepingud on
sõlmitud
Q3 2023 6 210 000
KLIM 5.3
.a
Rail Baltic
viaduktid ja
Ülemiste terminali
osalised ehitustööd
T 87a viaduktid on
valminud
Q1 2026 32 819 987
KLIM 5.3
b
Rapla-Lelle
raudteelõigu
ümberehitus
I M 88 b Tööde
üleandmis-
vastuvõtu aktid –
renoveeritud on
vähemalt 23km
Q1 2026 29 570 103
KLIM 5.4 Tallinna
Vanasadama
trammiliini
rajamine
I M 89 Trammiteede
ehitusprojekti
lõpuleviimine
Q4 2021 7 300 000
KLIM 5.4 Tallinna
Vanasadama
trammiliini
rajamine
M 90 Ehituslepingu
sõlmimine
Q2 2022 7 300 000
KLIM 5.4 Tallinna
Vanasadama
trammiliini
rajamine
T 91 Uus trammiliin Q4 2025 21 900 000
REM 5.5 KOVide
investeeringud
jalgratta- ja/või
jalgteedesse
I M 92 Konkurss toetuse
saamiseks
Q4 2022 1 000 000
REM 5.5 KOVide
investeeringud
jalgratta- ja/või
jalgteedesse
T 93 Valminud
jalgratta- ja
jalgteede
projektid
Q4 2025 4 000 000
SOM 6.1 Eesti
tervishoiukorraldu
se terviklik
muutmine
R M 94 Haiglavõrgu
arengukava
käsitleva
valitsuse määruse
jõustumine
Q4 2024 0
SOM 6.1 Eesti
tervishoiukorraldu
se terviklik
muutmine
R M 95 Tervishoiutöötaja
te nappuse
leevendamise
strateegilise
raamistiku
heakskiitmine
Q4 2022 0
SOM 6.1 Eesti
tervishoiukorraldu
se terviklik
muutmine
R M 96 Tervishoiuteenus
te korraldamise
seadust käsitleva
tervise- ja
tööministri
käskkirja
jõustumine, et
parandada arstide
ja proviisorite
kulude
hüvitamise
süsteemi.
Q1 2023 0
SOM 6.1 Eesti
tervishoiukorraldu
se terviklik
muutmine
R M 96a Tervishoiuteenus
te korraldamise
seadust käsitleva
tervise- ja
tööministri
käskkirja
jõustumine, et
parandada õdede
kulude
hüvitamise
süsteemi.
Q2 2024 0
SOM 6.1 Eesti
tervishoiukorraldu
se terviklik
muutmine
R T 97 Vastuvõtt
õenduse erialale
Q4 2023 0
SOM 6.1 Eesti
tervishoiukorraldu
se terviklik
muutmine
R M 98 Jõustub ministri
määrus, millega
muudetakse
sotsiaalministeeri
umi ja Tartu
Ülikooli vahelist
Q2 2026 0
lepingut arstide
nappuse kohta
teatavatel
erialadel.
SOM 6.2
.a
TERVIKUMI
rajamine
I M 99a TERVIKUMI
ehitamiseks
hankeleping
sõlmitud
Q2 2023 25 200 000
SOM 6.2
.a
TERVIKUMI
rajamine
M 100
a
TERVIKUM
valminud
Q4 2025 46 800 000
SOM 6.3 Tervishoiu
esmatasandi
tugevdamine
R M 106 Eesti haigekassa
tervishoiuteenust
e
loetelu
eriarstiabile
juurdepääsu osa
muutva valitsuse
akti jõustumine.
Q3 2020 0
SOM 6.3 Tervishoiu
esmatasandi
tugevdamine
R M 107 Jõustuvad
valitsuse akti
muudatused,
millega
muudetakse Eesti
haigekassa
tervishoiuteenust
e loetelu
perearstide
kulusid ja -
teenuseid
käsitlevat osa.
Q1 2021 0
SOM 6.3 Tervishoiu
esmatasandi
tugevdamine
R M 108 Tervishoiuteenus
te korraldamise
seaduse
muudatuste
jõustumine
Q1 2023 0
SOM 6.4 E-tervise
valitsemisraamisti
ku uuendamine
R M 109 E-tervise
valitsemisraamist
iku ja selle
rakenduskava
heakskiitmine
Q2 2023 0
MKM 6.6 Noorte tööpuudust
vähendavate
tööturumeetmete
pakkumine
I M 113 Meedet „Minu
esimene töökoht“
tugevdava
terviseja
tööministri
käskkirja
jõustumine.
Q1 2022 2 000 000
MKM 6.6 Noorte tööpuudust
vähendavate
tööturumeetmete
pakkumine
M 114 Noortegarantii
tegevuskava
Q2 2022 2 000 000
MKM 6.6 Noorte tööpuudust
vähendavate
tööturumeetmete
pakkumine
T 115 Tööjõuturuga
seotud
meetmetes
registreeritud
noorte arv
Q4 2025 6 000 000
MKM 6.7 Töötuskindlustush
üvitiste
pikendamine
R M 116 Tööturuteenuste
ja -toetuste
seaduse ning
Q2 2023 0
töötuskindlustuse
seaduse
muudatuste
jõustumine
SOM 6.8 Pikaajaline
hooldus
R M 117 Sotsiaalhoolekan
de seaduse
muudatuste
jõustumine
Q2 2022 0
SOM 6.8 Pikaajaline
hooldus
R M 118 Integreeritud
sotsiaal- ja
tervishoiuteenust
e osutamise
tegevuskava
Q4 2022 0
SOM 6.8 Pikaajaline
hooldus
R M 119 Sotsiaalkaitsemin
istri käskkirja
jõustumine
Q4 2024 0
SOM 6.8 Pikaajaline
hooldus
R M 120 Suure
hooldusvajaduse
ga laste
toetussüsteemi
parandamist
käsitlevate
seadusemuudatus
te jõustumine
Q1 2025 0
MKM 6.9 Soolise palgalõhe
vähendamine
R M 121 Heaolu
arengukava
(2023–2030)
vastuvõtmine
valitsuses
Q1 2024 0
MKM 6.9 Soolise palgalõhe
vähendamine
R M 122 Digitaalne
soolise palgalõhe
töövahend
Q4 2022 0
MKM 6.9 Soolise palgalõhe
vähendamine
R M 123 Digitaalne
soolise palgalõhe
töövahend
Q1 2024 0
RM 7.1 Taastekava
juhtimis- ja
kontrollisüsteemi
kehtestamine
R M 124 Jõustub valitsuse
määrus, millega
on kehtestatud
õigusraamistik
Eesti taaste- ja
vastupidavuskav
a rakendamiseks
ja järelevalveks.
Q4 2021 0
REM 8.1 Taastuvenergia
arendamise
kiirendamine
R M 125 avatud vooru
avamine
kohalikele
omavalitsustele
Q3 2023 2 000 000
KLIM 8.1 Taastuvenergia
arendamise
kiirendamine
R M 126 lubade
väljastamise,
planeerimise ja
keskkonnamõjud
e hindamisega
seotud protsesse
puudutavate
seadusemuudatus
te jõustamine
Q2 2024 13 419 323
KLIM 8.1 Taastuvenergia
arendamise
kiirendamine
M 127 tuuleenergia
arendamiseks
sobivate
eelisarendusalade
Q3 2024 13 419 323
kehtestamine
valitsuse
otsusega
KLIM 8.2 Taastuvenergia
tootmise võrku
integreerimise
võimekus
I M 129 Elektrijaotusvõrg
u tööde
rahastamisleping
u allkirjastamine
Q1 2024 7 600 000
KLIM 8.2 Taastuvenergia
tootmise võrku
integreerimise
võimekus
T 130 Täiendav 160
MW võrgumahtu
saadaval
Q1 2026 30 400 000
KLIM 8.3 Biogaasi ja
biometaani
tootmise ja
kasutamise
suurendamine
I M 132 Uuringu
läbiviimine, mis
tuvastab
vajalikud
regulatiivsed,
organisatsioonilis
ed ja rahalised
sekkumised
Q4 2024 0
KLIM 8.3 Biogaasi ja
biometaani
tootmise ja
kasutamise
suurendamine
M 133 Biogaasi ja
biometaani
tootmise ja
kasutuselevõtu
tegevuskava
koostamine
Q2 2025 200 000
REM 8.3 Biogaasi ja
biometaani
tootmise ja
kasutamise
suurendamine
I T 134 Täiendava
biometaani
tootmisvõimsuse
loomine
Q2 2026 16 000 000
Protokolli kantava otsuse „„Taaste- ja vastupidavuskava lisa“ ja toetuse riigisisese
väljamaksete korra kinnitamine“
eelnõu seletuskiri
1. Sissejuhatus
Taaste- ja vastupidavusrahastu (edaspidi RRF) rakendamiseks on „Taaste- ja
vastupidavuskavas“ (edaspidi taastekava) kokku lepitud reformid ja investeeringud ning
tulemused (eesmärgid ja sihid) koos tähtaegadega.
Eelnõuga kiidetakse Euroopa Parlamendi ja nõukogu määruse (EL) nr 2021/241, millega
luuakse taaste- ja vastupidavusrahastu (ELT L 57, 18.02.2021, lk 17-75), artikli 21 lõike 1 ja
Vabariigi Valitsuse 29. novembri 2021 määruse nr 108 „Taaste- ja vastupidavuskava
elluviimise korraldus ja toetuse andmise üldtingimused“ § 4 lõike 1 alusel heaks „Taaste- ja
vastupidavuskava lisa“ muudatus.
Taastekava koostati esmakordselt 2021.a. sügisel, kui lepiti Euroopa Komisjoniga kokku
reformid ja investeeringud koos siduvate eesmärkide ja ajakavaga RRF toetuse kasutamiseks.
2023.a. alguses tehti seoses rahastu mahu vähendamise ja REPowerEU toetuse lisandumisega
kavale muudatuste lisa, mis kiideti Euroopa Liidu Nõukogu poolt heaks mais 2023.a. 2025.a.
sügisel ning 2026.a. algul muudeti Taastekava seoses muutunud olude – sõja, inflatsiooni ja
majanduslanguse – mõjuga ning Euroopa Komisjoni 2025. a juunis antud lihtsustamisjuhiste
rakendamiseks. Kuna Taastekava elluviimise ja tulemuste Euroopa Komisjonile raporteerimise
lõpptähtaeg on august 2026.a., siis on tarvilik Taastekava veelkord täiendavalt korrigeerida, et
kõik kavas sisalduvad siduvad kokkulepped ja tulemused oleks võimalik tähtaegselt saavutada
ning tagada sellega Eestile kogu RRF toetuse väljamaksmine Euroopa Komisjoni poolt 2026.a.
lõpuks. Kavandatav muudatus on mitteametlikult läbi räägitud ka Euroopa Komisjoniga.
RRF on tulemuspõhine rahastamisinstrument, mille kohaselt teeb Euroopa Komisjon
väljamakseid liikmesriikidele üksnes Taastekavas kokkulepitud investeeringute/reformide
tulemuste (vahe-eesmärgid ja sihid) saavutamise alusel. Euroopa Komisjonilt laekub toetus
rahastamiskokkuleppes määratud kindlasummaliste maksetena, mis ei ole otseses vastavuses
riigisiseselt investeeringute/reformide rakendamisel tekkinud tegelike kuludega. Kuna Eestile
on laekumas Euroopa Komisjonilt veel viimased kaks makset ning RRF-i rakendamise
lõpptähtaeg on peagi saabumas, peame perioodi lõppedes tagama riigisiseselt tulude ja kulude
vastavuse riigisiseses väljamaksete korras.
Seletuskirja koostas Rahandusministeeriumi riigieelarve osakonna nõunik Rita Tubarik
([email protected], telefon 54640212); eelnõu juriidilise ekspertiisi tegi
Rahandusministeeriumi personali- ja õigusosakonna õigusloome valdkonna juht Virge
Aasa ([email protected], telefon 58851493).
2. Eelnõu eesmärk
Eelnõuga kinnitatakse Euroopa Parlamendi ja nõukogu määruse (EL) nr 2021/241, millega
luuakse taaste- ja vastupidavusrahastu(ELT L 57, 18.02.2021, lk 17-75), artikli 21 lõike 1 ja
Vabariigi Valitsuse 29. novembri 2021 määruse nr 108 „Taaste- ja vastupidavuskava
elluviimise korraldus ja toetuse andmise üldtingimused“ § 4 lõike 1 alusel „Taaste- ja
vastupidavuskava lisa“ muudatus.
Eelnõuga kinnitatakse Taastekava alusel laekuva toetuse riigisisese väljamaksete korra
muudatus.
3. Eelnõu sisu
3.1. Eelnõu otsusepunktiga 1 kinnitab Vabariigi Valitsus taaste- ja vastupidavuskava lisa.
Taastekava muudatused
Seoses RRF-i rakendamise lõpptähtaja peatse saabumisega 2026.a. augustis võimaldab
Euroopa Komisjon liikmesriikidel Taastekavasid veel viimast korda muuta kuni 31.05.2026, et
tagada kava edukas ja tähtaegne rakendamine ning kindlustada 2026.a. lõpuks rahastu
väljamaksed täismahus.
Eelmise Eesti Taastekava muudatusega 2026.a algul tehti vajalikud korrektuurid ära, kuid
pärast vastavat kava muudatust ilmnes Haridus- ja Teadusministeeriumi investeeringutes
asjaolusid, mis vajaksid kava muudatuse kaudu fikseerimist, et kindlustada Eestile kõik RRF-i
väljamaksed 2026.a. lõpuks.
Haridus- ja Teadusministeeriumi vastutusalas oleva reformi Oskuste reform ettevõtete
digipöördeks rakendamise raames on ilmnenud, et koolitustegevustes osalemise sihttaset ei ole
praegustes tingimustes võimalik saavutada. Võrreldes ajaga, mil meede algselt kavandati, on
nii majanduskeskkonnas kui ka IKT-sektoris toimunud märkimisväärsed muutused.
Majandusraskused, IKT-sektori nõudluse stabiliseerumine, koolitusturu küllastumine ning
ettevõtete kasvav eelistus ettevõttesiseste AI-koolituste suhtes on vähendanud nii tööandjate
kui ka osalejate huvi pikkade ümberõppeprogrammide vastu. Seetõttu tehakse ettepanek
vähendada osalejate sihttaset 2000-lt 1818-le, säilitades samal ajal koolituste kvaliteedi ja
sisulise mõju. Ühtlasi on vajalik muuta Haridus- ja Teadusministeeriumi koolitustegevusega
seotud tulemuste kirjeldust, selleks, et tulemuste saavutamise tõendamine oleks Eesti
süsteemide vaates korrektne.
Lisaks välja toodud muudatusele muudetakse Euroopa Komisjoni juhisele tuginedes osade
Nõukogu rakendusotsuses (CID) välja toodud tulemuste kirjeldusi, eesmärgiga lihtsustada
Taastekava rakendamist ja tulemuste tõendamist lihtsustada ning teha rahastu sulgemine
2026.a. sujuvamaks. Võttes arvesse Euroopa Komisjoni lihtsustamise juhiseid, muudetakse
järgmiste Taastekava investeeringute/reformide sh tulemuste kirjeldusi ja/või esitatavat
tõendusmaterjali:
T13; T20; T27; T31; M98
Uuendustega CID-projekt, mis esitatakse pärast Taastekava muudatuste ametlikku
heakskiitmist Euroopa Komisjoni poolt Euroopa Liidu Nõukogule kinnitamiseks, on esitatud
käesoleva eelnõu lisas.
3.2. Eelnõu otsusepunktiga 2 kinnitab Vabariigi Valitsus Taaste- ja vastupidavuskava
alusel laekuva toetuse riigisisene väljamaksete korra.
Seoses RRF-i rakendamisperioodi lõppemise ja viimaste arveldustega, on vajalik muuta ka
Euroopa Komisjonilt laekuva toetuse riigisisest väljamaksete korda ministeeriumide vahel.
Muudatus on vajalik, et tagada Euroopa Komisjonilt laekuva toetuse korrektne ja läbipaistev
jaotamine vastutavate ministeeriumide vahel ning vältida olukorda, kus jaotus ei vasta tehtud
kuludele ega võimalda perioodi lõpus tulude ja kulude tasakaalustamist.
Arvestades, et kõik RRF-i raames kokkulepitud tulemused peavad olema saavutatud hiljemalt
2026. aasta augusti lõpuks ning pärast seda tähtaega Euroopa Komisjon tulemusi enam arvesse
ei võta, on oluline, et riigisisene väljamaksete kord arvestaks rakendamise lõppfaasi eripärasid,
sealhulgas kulude abikõlblikkuse perioodi lõppemist ning väljamaksete ajastust.
Vabariigi Valitsuse 29. novembri 2021 määruse nr 108 „Taaste- ja vastupidavuskava
elluviimise korraldus ja toetuse andmise üldtingimused“ § 2 lõike 13 järgi tuleb abikõlblikkuse
perioodil tekkinud kulud tasuda hiljemalt 30. oktoobriks 2026. a. Pärast nimetatud tähtaega
tasutud kulud toetusest hüvitamisele ei kuulu.
Kui ministeeriumid on abikõlblikud kulud 30.oktoobriks 2026.a. ära teinud ning Euroopa
Komisjonilt laekuvad Eestile viimased toetuse väljamaksed, siis tehakse ministeeriumidele
viimased maksed vastavalt reformi/investeeringu eelarve piires 31.08.2026 seisuga tekkinud
seni laekumata nõuete mahule.
3.3. Eelnõu otsusepunkti 3 kohaselt esitab Rahandusministeerium taastekava lisa
Euroopa Komisjonile heakskiitmiseks.
Tulenevalt Euroopa Parlamendi ja nõukogu määrusest (EL) 2021/241, millega luuakse taaste-
ja vastupidavusrahastu (ELT L 57, 18.2.2021, lk 17–75) tuleb liikmesriigil Taastekava
muutmiseks esitada pärast mitteametlikke läbirääkimisi ametlik ettepanek Euroopa
Komisjonile, kellel on Taastekava muudatuse heakskiitmiseks aega kaks kuud, misjärel on
Euroopa Liidu Nõukogul aega neli nädalat Taastekava muudatuse alusel rakendusotsuse
tegemiseks. Muudatused jõustuvad pärast Euroopa Liidu Nõukogu rakendusotsuse tegemist.
Kuna Taastekava ellu viimiseks on jäänud vaid pool aastat, siis lubatakse koos Taastekava
muudatuse heakskiitmisega Vabariigi Valitsuse poolt ministeeriumitel jätkata kõikide
tegevustega muudetud Taastekava lisa alusel ära ootamata nõukogu rakendusotsust, et
saavutada kõik uuendatud kavas fikseeritud tulemused hiljemalt augusti lõpuks 2026. aastal.
3.4. Eelnõu otsusepunkti 4 kohaselt esitab Rahandusministeerium Taastekava lisa Riigi
Tugiteenuste Keskusele Taaste- ja vastupidavusrahastu veebilehel avaldamiseks peale
selle kinnitamist Euroopa Liidu Nõukogu poolt.
Taaste- ja vastupidavusrahastu ning Taastekava materjalid, aga ka rakendamist puudutav
jooksev ülevaade on avaldatud Riigi Tugiteenuste Keskuse veebilehel aadressil
https://rtk.ee/toetused-taotlemine/taaste-ja-vastupidavusrahastu-rrf, kuhu lisatakse ka
käesoleva kava muudatusega seotud materjalid.
4. Eelnõu vastavus Euroopa Liidu ja Eesti õigusele
Eelnõu on valmistatud ette kooskõlas Euroopa Parlamendi ja nõukogu määrusega (EL)
2021/241, millega luuakse taaste- ja vastupidavusrahastu (ELT L 57, 18.2.2021, lk 17–75), ning
Euroopa Parlamendi ja nõukogu määrusega (EL) 2023/435, millega muudetakse määrust (EL)
2021/241 seoses REPowerEU peatüki lisamisega taaste- ja vastupidavuskavadesse ning millega
muudetakse määruseid (EL) nr 1303/2013, (EL) 2021/1060, (EL) 2021/1755 ja direktiivi
2003/87/EÜ, samuti kooskõlas Vabariigi Valitsuse 29. novembri 2021. a määrusega nr 108
„Taaste- ja vastupidavuskava elluviimise korraldus ja toetuse andmise üldtingimused“.
5. Eelnõu mõju
Taaste- ja vastupidavusrahastu kogumaht Eestile on 953 184 800 eurot ning sellest 627 mln on
tänaseks 65 saavutatud ja raporteeritud tulemuse eest laekunud. 2026.aasta kevadeks jääb
saavutada veel 48 tulemust ning nendega seotud väljamaksed teeb Euroopa Komisjon hiljemalt
2026.a. lõpuks. Eelnõuga heaks kiidetavas Taastekava lisas ja EL Nõukogu rakendusotsuse
projektis välja toodud muudatuste eesmärk on tagada 2026. aasta lõpuks Eestile RRF-i
väljamaksed täismahus.
6. Eelnõu jõustumine
Vabariigi Valitsuse kinnitamise järel esitab Rahandusministeerium Taastekava Euroopa
Komisjonile heakskiitmiseks.
7. Eelnõu kooskõlastamine
Taastekava lisa on sõnastatud koostöös Haridus- ja Teadusministeeriumiga ning Euroopa
Komisjoniga mitteametlikult läbi räägitud.
EELNÕU
2026
VABARIIGI VALITSUS
ISTUNGI PROTOKOLL
Tallinn, Stenbocki maja 2026 nr Päevakorrapunkt nr „Taaste- ja vastupidavuskava lisa“ ja toetuse riigisisese väljamaksete korra kinnitamine 1. Kinnitada „Taaste- ja vastupidavuskava lisa“.
2. Kinnitada Taaste- ja vastupidavuskava alusel laekuva toetuse riigisisene väljamaksete kord.
3. Rahandusministeeriumil avaldada punktis 1 nimetatud dokument taaste- ja
vastupidavusrahastu veebilehel pärast seda, kui Euroopa Liidu Nõukogu on muudatused
heaks kiitnud.
4. Rahandusministeeriumil esitada Taastekava lisa Euroopa Komisjonile heakskiitmiseks.
Kristen Michal
Peaminister
Keit Kasemets
Riigisekretär