| Dokumendiregister | Riigikogu |
| Viit | 1-2/26-562/1 |
| Registreeritud | 21.08.2026 |
| Sünkroonitud | 29.08.2026 |
| Liik | EL dokument |
| Funktsioon | |
| Sari | |
| Toimik | Ettepanek: NÕUKOGU RAKENDUSOTSUS, millega muudetakse 13. juuli 2021. aasta rakendusotsust, millega kiidetakse heaks Itaalia taaste- ja vastupidavuskavale antud hinnang - SWD(2026) 266, COM(2026) 434 |
| Juurdepääsupiirang | Avalik |
| Adressaat | |
| Saabumis/saatmisviis | |
| Vastutaja | |
| Originaal | Ava uues aknas |
| Taotle dokumendi eemaldamist või parandamist |
EN EN
EUROPEAN COMMISSION
Brussels, 7.8.2026 COM(2026) 434 final
2026/0238 (NLE)
Proposal for a
COUNCIL IMPLEMENTING DECISION
amending the Implementing Decision of 13 July 2021 on the approval of the assessment
of the recovery and resilience plan for Italy
{SWD(2026) 266 final}
EN 1 EN
2026/0238 (NLE)
Proposal for a
COUNCIL IMPLEMENTING DECISION
amending the Implementing Decision of 13 July 2021 on the approval of the assessment
of the recovery and resilience plan for Italy
THE COUNCIL OF THE EUROPEAN UNION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EU) 2021/241 of the European Parliament and of the Council of
12 February 2021 establishing the Recovery and Resilience Facility1, and in particular
Article 20(1) thereof,
Having regard to the proposal from the European Commission,
Whereas:
(1) Following the submission of the national recovery and resilience plan (‘RRP’) by Italy
on 30 April 2021, the Commission proposed its positive assessment to the Council. On
13 July 2021, the Council approved the positive assessment by means of an
implementing decision2 (‘the Council Implementing Decision of 13 July 2021’). The
Council Implementing Decision of 13 July 2021 was amended by the Council
Implementing Decisions of 19 September 20233, of 8 December 20234, of
14 May 20245, of 18 November 20246, of 20 June 20257, of 27 November 20258, and
of 30 March 20269.
(2) On 11 June 2026, Italy made a reasoned request to the Commission to make a proposal
to amend the Council Implementing Decision of 13 July 2021 in accordance with
Article 21(1) of Regulation (EU) 2021/241 on the grounds that the RRP is partially no
longer achievable because of objective circumstances. On that basis, Italy has
submitted an amended RRP.
Amendments based on Article 21 of Regulation (EU) 2021/241
(3) The amendments to the RRP submitted by Italy because of objective circumstances
concern 118 measures.
1 OJ L 57, 18.2.2021, p. 17, ELI: https://eur-lex.europa.eu/eli/reg/2021/241/oj. 2 ST 10160/21 INIT; ST 10160/21 ADD 1 REV 2; ST 10160/21 ADD 1 REV 2 COR 1 (sk). 3 ST 12259/23 INIT. 4 ST 16051/23 INIT; ST 16051/23 ADD 1; ST 16051/23 ADD 1 REV 1 (ga). 5 ST 9399/24 INIT; ST 9399/24 ADD 1; ST 9399/24 ADD1 COR 2 (sv). 6 ST 15114/24 INIT; ST 15114 ADD 1 REV 1. 7 ST 9587/25 INIT; ST 9587/25 ADD 1. 8 ST 15106/25 INIT: ST 15106/25 ADD 1; ST 15106/25 ADD 1 COR 1 (sv). 9 ST 7138/26 INIT; ST 7138/26 ADD 1.
EN 2 EN
(4) Italy has requested that two measures be removed due to objective circumstances. This
concerns: M3C1-11 under Investment 1.3 (Diagonal connections) under Mission 3,
Component 1; M5C3-14 under Investment 1.5 (Tax Credit Scheme for Investments in
Southern Italy and the Special Economic Zone (SEZ) under Mission 5, Component 3.
The Council Implementing Decision of 13 July 2021 should be amended accordingly.
(5) Italy has explained that three measures are partially no longer achievable, because of
lack of or change in demand. This concerns M2C1-8 under Investment 2.3 (Innovation
and mechanization in the agricultural and food sectors) under Mission 2, Component
1; M2C2-45 under Investment 1.1 (Development of agri-voltaic systems) under
Mission 2, Component 2; M3C2-5bis under Investment 2.1 (Digitalisation of the
logistic chain) under Mission 3, Component 2. On this basis, Italy has requested that
those measures be amended. The Council Implementing Decision of 13 July 2021
should be amended accordingly.
(6) Italy has explained that five measures are partially no longer achievable due to
changes in market conditions, including unforeseen delays in supply affecting
procurement procedures. This concerns M1C2-15 under Investment 2 (Innovation and
technology of microelectronics) under Mission 1, Component 2; M2C1-9 under
Investment 2.2 (Agri-Solar Park) under Mission 2, Component 1; M2C2-29 under
Investment 4.3 (Installation of charging infrastructures); M7-27 under Investment 8
(Sustainable, circular and secure supply of Critical Raw Materials); M7-41 and M7-42
under Investment 15 (Transizione 5.0) under Mission 7. On this basis, Italy has
requested that those measures be amended. The Council Implementing Decision of 13
July 2021 should be amended accordingly.
(7) Italy has explained that one measure is partially no longer achievable due to technical
impediments delaying the actual implementation. This concerns M3C1-26 and M3C1-
27 under Reform 1.3 (Boosting the efficiency of railway infrastructure in Italy) under
Mission 3, Component 1. On this basis, Italy has requested that those measures be
amended. The Council Implementing Decision of 13 July 2021 should be amended
accordingly.
(8) Italy has explained that two measures are partially no longer achievable due to
inflation and operational issues of technical nature. This concerns M3C1-5 and M3C1-
6 under Investment 1.1 (High-speed railway connections in the Centre and South for
passengers and freight); M3C1-9 under Investment 1.2 (High speed lines in the North
connecting to the rest of Europe) under Mission 3, Component 1. On this basis, Italy
has requested that those measures be amended. The Council Implementing Decision of
13 July 2021 should be amended accordingly.
(9) Italy has explained that one measure is partially no longer achievable due to the
occurrence of extreme weather events triggering the adoption of a Declaration on the
State of Emergency10 in 2025 and 2026 that affected the territories of Calabria,
Sardinia and Sicily. This concerns M2C4-38 under Investment 4.4 (Investments in
sewerage and purification) under Mission 2, Component 4. On this basis, Italy has
requested that this measure be amended. The Council Implementing Decision of
13 July 2021 should be amended accordingly.
10 Deliberation of the Council of Ministers of 4 June 2025 declaring the State of Emergency for the
Metropolitan Cities of Catania and Messina; Deliberation of the Council of Ministers n. 157 of
26 January 2026 declaring the State of Emergency for the territories of Calabria, Sicily and Sardinia.
EN 3 EN
(10) Italy has explained that nine measures have been amended to implement better
alternatives in order to achieve their original ambition. This concerns M1C2-34 under
Investment 9 (Scale-up measure: Transition 4.0) under Mission 1, Component 2;
M2C2-35bis under Investment 4.4.2 (Strengthening of the regional public transport
railway fleet with zero emission trains and universal service); M2C2-43 under
Investment 5.4 (Equity injection into the Green Transition Fund (“GTF”) managed by
CDP Venture Capital SGR) under Mission 2, Component 2; M2C2-47 under
Investment 1.2 (Promotion of renewable energy sources for energy communities and
jointly acting renewables self-consumers); M2C4-39 and M2C4-40 under Investment
4.5 (Grant scheme for investments on water infrastructure) under Mission 2,
Component 4; M3C1-20 under Investment 1.8 (Upgrading railway stations) under
Mission 3, Component 1; M7-31 under Investment 11 (Scale-up: Strengthening of the
regional public transport railway fleet with zero emission trains and universal service);
M7-44 under Investment 16 (Support to SMEs for self-production from renewable
energy sources); M7-49 under Investment 17 (Financial instrument for energy
renovations of public residential housing) under Mission 7 On this basis, Italy has
requested that those measures be amended. The Council Implementing Decision of 13
July 2021 should be amended accordingly.
(11) Italy has explained that 93 measures have been amended to implement better
alternatives that allow the administrative burden to be reduced and simplify the
Council Implementing Decision, while still achieving the objectives of those
measures. This concerns: M1C1-26 under Investment 1.1 (Digital Infrastructure);
M1C1-45 under Reform 1.4 (Reform of civil justice); M1C1-46 under Reform 1.5
(Reform of criminal justice); M1C1-59ter and M1C1-63 under Reform 1.9 (Public
employment reform and simplification reform); M1C1-66 under Investment 1.9
(Provide technical assistance and strengthen capacity building for the implementation
of the Italian recovery and resilience plan); M1C1-117 under Reform 1.15 (Reform of
public accounting rules); M1C1-119 under Reform 1.14 (Reform of the subnational
fiscal framework); M1C1-121 bis under Reform 1.12 (Reform of the tax
administration); M1C1-122 under Reform 1.13 (Reform of the spending review
framework); M1C1-148 under Investment 1.4.1 (Citizen experience – Improvement of
the quality and the usability of digital public services); M1C1-151 under Investment
1.4.5 (Digitalization of public notices); M1C1-152 under Investment 1.6.1
(Digitalization of the Ministry of Interior); M1C1-155 under Investment 1.6.3
(Digitization of National Social Security Institute (INPS) and National Institute for
Insurance against Accidents at work (INAIL)) under Mission 1, Component 1; M1C2-
13bis under Reform 2 (Annual Competition Laws); M1C2-14ter under Reform 3
(Rationalization and simplification of firms’ incentives); M1C2-17, M1C2-18, M1C2-
20 and M1C2-21 under Investment 3 (Fast internet connections (Ultra-Broadband and
5G)); M1C2-23bis under Investment 4 (Satellite Technology and Space economy)
under Mission 1, Component 2; M1C3-3 under Investment 1.2 (Removal of physical
and cognitive barriers in museums, libraries, and archives to enable wider access to
and participation in culture); M1C3-16bis under Investment 2.1 (Attractiveness of
Small Historic Towns); M1C3-17 under Investment 2.2 (Protection and enhancement
of rural architecture and landscape); M1C3-19 under Investment 2.4 (Seismic safety of
places of worship, restoration of FEC heritage and shelters for artworks (Recovery
Art)); M1C3-21 under Investment 3.2 (Development of the film industry (Cinecittà
project)); M1C3-29 under Investment 4.2 (Funds for the competitiveness of tourism
enterprises); M1C3-36 under Investment 4.3 (Caput Mundi – Next Generation EU for
touristic great events) under Mission 1, Component 3; M2C1-10 under Investment 2.1
EN 4 EN
(Logistics plan for the agri-food, fishing and aquaculture, forestry, floriculture and
plant nursery sectors); M2C1-16quater under Investment 1.1 (Implementation of new
waste management plants and modernisation of existing plants and circular economy
flagship projects); M2C1-19 under Investment 3.1 (Green Islands); M2C1-21 under
Investment 3.2 (Green communities) under Mission 2, Component 1; M2C2-10 under
Investment 2.1 (Strengthening smart grids); M2C2-13 under Investment 2.2
(Interventions to increase the resilience of the power grid); M2C2-17 under
Investment 3.4 (Hydrogen testing for railway mobility and road transport); M2C2-23
under Investment 4.1 (Investment in soft mobility (National Plan of Cycle Paths));
M2C2-26 under Investment 4.2 (Development of Rapid Mass Transport systems);
M2C2-30 under Investment 4.5 (Private and light commercial vehicle fleet renewal
programme with electric vehicles); M2C2-35ter under Investment 4.4.1 (Strengthening
of the regional public transport bus fleet with zero-emission buses); M2C2-40 under
Investment 5.1 (Support to the production system for the Ecological Transition, Net
Zero Technologies, and competitiveness and resilience of strategic supply chains);
M2C2-49 under Investment 3.1 (Production of Hydrogen in brownfield sites
(Hydrogen Valleys)); M2C2-53 under Investment 5.2 (Hydrogen) under Mission 2,
Component 2; M2C3-6 under Investment 1.1 (Construction of new schools through
building replacement); M2C3-10 under Investment 3.1 (Promotion of efficient district
heating) under Mission 2, Component 3; M2C4-6bis under Investment 3.2
(Digitisation of national parks); M2C4-11bis under Investment 2.1a (Measures for
flood and hydrogeological risk reduction – Interventions in Emilia-Romagna, Toscana,
and Marche); M2C4-13 under Investment 2.1b (Measures for flood and
hydrogeological risk reduction); M2C4-20bis under Investment 3.1 (Protection and
enhancement of urban and peri-urban forests); M2C4-23 under Investment 3.3 (Re-
naturification of Po area); M2C4-25 under Investment 3.4 (Remediation of orphan-
sites soil); M2C4-29 under Investment 4.1 (Investments in primary water
infrastructures for the security of water supply); M2C4-34bis under Investment 4.3
(Investments in the resilience of the irrigation agrosystem for better management of
water resources) under Mission 2, Component 4; M3C1-14 under Investment 1.4
(European Rail Transport Management System (ERTMS)); M3C1-28 under
Investment 1.10 (Strengthening metropolitan nodes and regional railway lines) under
Mission 3, Component 1; M3C2-6 under Investment 2.2 (Digitalization of air traffic
management); M3C2-9 under Investment 1.1 (Green ports: renewable energy and
energy efficiency interventions at ports); M3C2-12 under Investment 2.3 (Cold
ironing) under Mission 3, Component 2; M4C1-14ter under Reform 2.1 (Teachers’
Recruitment); M4C1-18 under Investment 1.1 (Plan for nurseries and preschools and
early childhood education and care services); M4C1-20 under Investment 5
(Development of the tertiary vocational training system (ITS)); M4C1-21 under
Investment 1.2 (Plan for the extension of full-time); M4C1-22 under Investment 1.3
(School Sports Infrastructure Enhancement Plan); measure description of M4C1-24
under Investment 1.6 (Active orientation in school-university transition); M4C1-26
under Investment 3.3 (School building security and structural rehabilitation plan);
M4C1-30 under Reform 1.7 (Student Housing) under Mission 4, Component 1;
M4C2-9 under Investment 1.4 (Creation of “national R&D leaders” on Key Enabling
Technologies); M4C2-14 under Investment 2.3 (Technology transfer centres); M4C2-
16bis under Investment 3.1 (Research and innovation infrastructures); M4C2-18bis
under Investment 1.5 (“Innovation ecosystems for sustainability”, building “territorial
leaders of R&D”) under Mission 4, Component 2; M5C1-4bis under Reform 1
(ALMPs and Vocational Training); M5C1-7bis under Investment 1 (Strengthening
Public Employment Services (PES)); M5C1-11 under Reform 2 (Undeclared Work);
EN 5 EN
M5C1-14 under Investment 2 (Gender Equality Certification System) under Mission
5, Component 1; M5C1-16 under Investment 4 (Universal Civil Service) under
Mission 5, Component 1; the measure description under Investment 3 (Housing First
and Post Stations); M5C2-8 under Investment 2 (Autonomy Patterns for People with
Disabilities); M5C2-12 under Investment 4 (Investments in Urban Regeneration
Projects Aimed at Reducing Situations of Marginalisation and Social Degradation);
M5C2-14 and M5C2-16 under Investment 5 (Urban Integrated Plans); M5C2-20 under
Investment 6 (Innovation Programme for Housing Quality); M5C2-22 under
Investment 7 (Sport and Social Inclusion) under Mission 5, Component 2; M5C3-13
under Investment 1.4 (Infrastructural Investments for the Special Economic Zone)
under Mission 5, Component 3; M6C1-11 Investment 1.3 (Strengthening Intermediate
Healthcare and its facilities (Community Hospitals); M6C2-6 and M6C2-9 under
Investment 1.1 (Digital Update of Hospitals’ Technological Equipment); M6C2-10bis
under Investment 1.2 (Towards a Safe and Sustainable Hospital); M6C2-12 under
Investment 1.3 (Strengthening the Technological Infrastructure and the Tools for Data
Collection, Data Processing, Data Analysis and Simulation) under Mission 6,
Component 2; M6C2-16 Investment 2.2 (Development of technical-professional,
digital and managerial skills of professionals in the healthcare system); M7-3 under
Reform 1 (Streamlining permitting procedures for renewable energy at central and
local level); M7-11 under Investment 1 (Scale-up measure: Smart grids); M7-12 under
Investment 2 (Scale-up measure: Interventions to increase the resilience of power
grid); M7-13 under Investment 3 (Scale-up measure: Production of Hydrogen in
brownfield sites (Hydrogen Valleys)); M7-15 under Investment 4 (Tyrrhenian link);
M7-17 under Investment 5 (SA.CO.I.3); M7-22 under Investment 7 (Smart National
Transmission Grid); M7-37 under Investment 13 (Adriatic Line Phase 1 (Sulmona
compressor station and Sestino-Minerbio gas pipeline)); M7-39 under Investment 14
(Cross-border gas export infrastructure); M7-50 under Investment 18 (Scale-up
measure: Private and light commercial vehicle fleet renewal programme with electric
vehicles) under Mission 7. On this basis, Italy has requested that those measures be
amended. The Council Implementing Decision of 13 July 2021 should be amended
accordingly.
(12) Following the removal and decrease in the level of implementation of measures in
accordance with Article 21 of Regulation (EU) 2021/241, Italy has requested to use
the resources freed up by the removal of measures and decrease in the level of their
implementation toadd two new measures and increase the level of implementation of
eight measures. This concerns M1C2-34 under Investment 9 (Scale-up measure:
Transition 4.0) under Mission 1, Component 2; M2C2-35bis under Investment 4.4.2
(Strengthening of the regional public transport railway fleet with zero emission trains
and universal service); M2C2-47 under Investment 1.2 (Promotion of renewable
energy sources for energy communities and jointly acting renewables self-consumers);
M2C2-54 under Investment 4.6 (Diagnostic trains); M2C2-55 under Investment 5.5
(Green Tax Credit) under Mission 2, Component 2; M2C4-39 and M2C4-40 under
Investment 4.5 (Grant scheme for investments on water infrastructure) under Mission
2, Component 4; M3C1-20 under Investment 1.8 (Upgrading railway stations) under
Mission 3, Component 1; M5C1-19bis and M5C1-20 under Investment 5 (Creation of
women’s enterprises) under Mission 5, Component 1; M7-31 under Investment 11
(Scale-up: Strengthening of the regional public transport railway fleet with zero
emission trains and universal service); M7-44 and M7-45 under Investment 16
(Support to SMEs for self-production from renewable energy sources); M7-49 under
Investment 17 (Financial instrument for energy renovations of public residential
EN 6 EN
housing) under Mission 7. On this basis, Italy has requested that the level of
implementation of eight measures be increased and that two new measures be added.
The Council Implementing Decision of 13 July 2021 should be amended accordingly.
Corrections of clerical errors
(13) Two clerical errors have been identified in the text of the Council Implementing
Decision of 13 July 2021, affecting two milestones and targets in two measures under
two components. The Council Implementing Decision of 13 July 2021 should be
amended to correct these clerical errors that do not reflect the content of the RRP
submitted to the Commission on 30 April 2021, as agreed between the Commission
and Italy. Those clerical errors relate to M1C2-31 of Investment 7 (National
Connectivity Fund) under Mission 1, Component 2; M4C1-23 of Investment 3.4
(Teaching and advanced university skills) under Mission 4, Component 1. Those
corrections do not affect the implementation of the measures concerned.
Commission’s assessment
(14) The Commission has assessed the amended RRP against the assessment criteria laid
down in Article 19(3) of Regulation (EU) 2021/241.
Contribution to the REPowerEU objectives
(15) In accordance with Article 19(3), point (da), of, and criterion 2.12 of Annex V to,
Regulation (EU) 2021/241, the REPowerEU chapter is expected to effectively
contribute to a large extent (rating A) to energy security, the diversification of the
Union’s energy supply, an increase in the uptake of renewables and in energy
efficiency, an increase of energy storage capacities or the necessary reduction of
dependence on fossil fuels before 2030.
(16) The amendments concerning Reform 1 (Streamlining permitting procedures for
renewable energy at central and local level); Investment 1 (Scale-up measure: Smart
grids); Investment 2 (Scale-up measure : Interventions to increase the resilience of
power grid); Investment 3 (Scale-up measure: Production of Hydrogen in brownfield
sites (Hydrogen Valleys); Investment 4 (Tyrrhenian link); Investment 5 (SA.CO.I.3);
Investment 7 (Smart National Transmission Grid); Investment 8 (Sustainable, circular
and secure supply of Critical Raw Materials); Investment 11 (Strengthening of the
regional public transport railway fleet with zero emission trains and universal service);
Investment 13 (Adriatic Line Phase 1 (Sulmona compressor station and Sestino-
Minerbio gas pipeline); Investment 14 (Cross-border gas export infrastructure);
Investment 15 (Transizione 5.0); Investment 16 (Support to SMEs for self-production
from renewable energy sources); Investment 17 (Financial instrument for energy
renovations of public residential housing) and Investment 18 (Scale-up measure:
Private and light commercial vehicle fleet renewal program with electric vehicles) do
not change the overall assessment that implementation of the measures included in the
REPowerEU chapter are expected to contribute, in particular, to supporting the
objectives in Article 21c(3), points (a), (b), (c), (d), (e), and (f) of Regulation
2021/241. The chapter effectively contributes to a large extent to energy security, the
diversification of the Union’s energy supply, an increased uptake of renewables and
energy efficiency, and the reduction of dependence on fossil fuels before 2030.
Therefore, the amended plan effectively contributes to the objectives of Article 19(3),
point (da).
Contribution to the green transition including biodiversity
EN 7 EN
(17) In accordance with Article 19(3), point (e), of, and criterion 2.5 of Annex V to,
Regulation (EU) 2021/241, the amended RRP contains measures that contribute to a
large extent (rating A) to the green transition, including biodiversity, or to addressing
the challenges resulting therefrom. The measures supporting climate objectives
account for an amount which represents 37% of the amended RRP’s total allocation
and 71.9% of the total estimated costs of measures in the REPowerEU chapter
calculated in accordance with the methodology set out in Annex VI to Regulation
(EU) 2021/241. In accordance with Article 17 of Regulation (EU) 2021/241, the
amended RRP is consistent with the information included in the National Energy and
Climate Plan 2021-2030.
(18) The amendments to the contribution to the green transition relate to the decrease in
allocation for a number of measures across several missions and components. The
reduction was partially offset by a number of new investments and measures with an
increased level of implementation. The decrease in allocation concerned Investment
2.2 (Agri-solar Park) under Mission 2, Component 1. The increase in Investment 1.2
(Promotion of renewable energy communities and jointly acting renewables self-
consumers), together with the increase in allocation for Investment 4.4.2 (Renewal of
the regional public transport railway fleet with clean fuels trains and universal
service), Investment 5.1 (Net Zero Technologies) and the creation of Investment 4.6
(Diagnostic trains), Investment 5.5 (Green Tax Credit) and the increase in green
tagging also for Investment 5.4 (Equity injection into the Green Transition Fund
(“GTF”) managed by CDP Venture Capital SGR) more than compensated the decrease
in Investment 1.1 (Development of agri-voltaic systems) and in Investment 4.3
(Installation of charging infrastructures) under Mission 2, Component 2. An increase
in allocation concerned Investment 4.5 (Grant scheme for investments on water
infrastructures) under Mission 2, Component 4. Additionally, under Mission 3,
Component 1, the reduction in allocation for Reform 1.3 (Boosting the efficiency of
railway infrastructure in Italy) under Mission 3, Component 1 was partially offset by
an increase in allocation for Investment 1.8 (Upgrading railway stations). The decrease
in also concerned Investment 6 (Innovation Programme for Housing Quality) under
Mission 5, Component 2; and in Investment 1.1 (Community Health Houses to
improve territorial health assistance) under Mission 6, Component 1. Finally under
Mission 7, the decrease in allocation concerning the contribution to the green
transition in Investment 8 (Sustainable, circular and secure supply of Critical Raw
Materials); Investment 15 (Transizione 5.0) under Mission 7 was more than off-set by
the increase in allocation in Investment 11 (Scale-up: Strengthening of the regional
public transport railway fleet with zero emission trains and universal service);
Investment 16 (Support to SMEs for self-production from renewable energy sources);
Investment 17 (Financial instrument for energy renovations of public residential
housing).
(19) Overall, the measures in the amended RRP continue to significantly contribute to
Italy’s green transition. Due to the differing climate tagging content of the increase
measure and the decreased measures, the amendments to Italy’s RRP entail a net
decrease in the overall contribution to the climate target of the RRP by 0.1 percentage
points to 37% from 37.1%. The scope of the amendments does not change the overall
assessment of this criterion.
Contribution to the digital transition
(20) In accordance with Article 19(3), point (f), of, and criterion 2.6 of Annex V to,
Regulation (EU) 2021/241, the amended RRP contains measures that contribute to a
EN 8 EN
large extent (rating A) to the digital transition or to addressing the challenges resulting
from it. The measures supporting digital objectives account for an amount which
represents 26.4% of the amended RRP’s total allocation calculated in accordance with
the methodology set out in Annex VII to that Regulation.
(21) The decrease in allocation concerns Investment 2 (Innovation and technology of
microelectronics) under Mission 1, Component 2 and Investment 2.1 (Digitalization of
the logistic chain) under Mission 3, Component 2.
(22) Overall, the measures in the amended RRP continue to contribute to Italy’s digital
transition: due to the differing digital tagging content of the decreased measures, the
amendments to Italy’s RRP entail a net decrease of 0.1 percentage points to 26.4%
from 26.5%. The limited scope of these amendments does not change the overall
assessment of this criterion.
Costing
(23) In accordance with Article 19(3), point (i), of, and criterion 2.9 of Annex V to,
Regulation (EU) 2021/241, the justification provided in the amended RRP on the
amount of the estimated total cost of the RRP is to a medium extent (rating B)
reasonable and plausible, is in line with the principle of cost efficiency and is
commensurate to the expected national economic and social impact.
(24) The amount of the estimated total cost of the amended RRP is in line with the nature
and type of the envisaged reforms and investments. As a result, cost estimates for most
of the measures in the amended RRP are deemed reasonable and plausible. Italy has
provided sufficient information and evidence that the amount of the estimated total
cost is not covered by existing or planned Union financing. Finally, the estimated total
cost of the amended RRP is in line with the principle of cost efficiency and
commensurate with the expected national economic and social impact. Therefore, a
rating B is warranted for the amended RRP.
Any other assessment criteria
(25) The Commission considers that the amendments put forward by Italy do not affect the
positive assessment of the RRP set out in the Council Implementing Decision
10160/21 of 13 July 2021 on the approval of the assessment of the RRP for Italy
regarding the relevance, effectiveness, efficiency and coherence of the RRP against the
assessment criteria laid down in Article 19(3), points (a), (b), (c), (d), (db), (g), (h), (j)
and (k).
Positive assessment
(26) Following the positive assessment by the Commission of the amended RRP, with the
finding that the RRP satisfactorily complies with the criteria for assessment set out in
Regulation (EU) 2021/241, in accordance with Article 20(2) of and Annex V to that
Regulation, the reforms and investment projects necessary for the implementation of
the amended RRP, the relevant milestones, targets and indicators, and the amount
made available from the Union for the implementation of the amended RRP should be
set out.
Financial contribution
(27) The estimated total costs of Italy’s amended RRP is EUR 194 435 381 164. As the
amount of the estimated total cost of the amended RRP is higher than the updated
maximum financial contribution available for Italy, the financial contribution
determined in accordance with Article 4a of Regulation (EU) 2021/1755 of the
EN 9 EN
European Parliament and of the Council11, and with Article 20(4) and Article 21a(6) of
Regulation (EU) 2021/241 that is allocated for Italy’s amended RRP should be equal
to EUR 71 779 623 788. Therefore, the financial contribution made available to Italy
remains unchanged.
Loans
(28) The loan support made available to Italy amounting to EUR 122 601 810 400 remains
unchanged.
(29) The Council Implementing Decision of 13 July 2021 should therefore be amended
accordingly. For the sake of clarity, the Annex to the Council Implementing Decision
of 13 July 2021 should be replaced entirely.
(30) This Decision should be without prejudice to the outcome of any procedures relating
to the award of Union funds under any Union programme other than the Facility or to
procedures relating to distortions of the operation of the internal market that may be
undertaken, in particular under Articles 107 and 108 of the Treaty. It does not override
the requirement for Member States to notify instances of potential State aid to the
Commission under Article 108 of the Treaty,
HAS ADOPTED THIS DECISION:
Article 1
Approval of the assessment of the RRP
The assessment of the amended RRP for Italy on the basis of the criteria provided for in
Article 19(3) of Regulation (EU) 2021/241 is approved.
Article 2
Amendments
The Council Implementing Decision of 13 July 2021 on the approval of the assessment of the
recovery and resilience plan for Italy is amended as follows:
the Annex is replaced by the text set out in the Annex to this Decision.
Article 3
Addressee
This Decision is addressed to the Italian Republic.
Done at Brussels,
For the Council
The President
11 Regulation (EU) 2021/1755 of the European Parliament and of the Council of 6 October 2021
establishing the Brexit Adjustment Reserve (OJ L 357, 8.10.2021, p. 1,
ELI: http://data.europa.eu/eli/reg/2021/1755/oj).
EN EN
EUROPEAN COMMISSION
Brussels, 7.8.2026 COM(2026) 434 final
ANNEX
ANNEX
to the
Proposal for a Council Implementing Decision
amending the Implementing Decision of 13 July 2021 on the approval of the assessment
of the recovery and resilience plan for Italy
{SWD(2026) 266 final}
1
ANNEX
1. DESCRIPTION OF REFORMS AND INVESTMENTS
A. MISSION 1 COMPONENT 1
Axis 1 - Digitalization of the Public Administration: Axis 1 of component M1C1 of the Italian
recovery and resilience plan contains measures that aim to foster the digitalisation of the Italian public
administration and includes seven investments and three reforms. Investments aim in particular at: (i)
rationalising and consolidating existing digital infrastructures of the public administration; (ii)
fostering the uptake of cloud computing, (iii) with particular attention to the harmonisation and
interoperability of platforms and data services, the implementation of the ‘once-only principle’ and the
accessibility of data through a catalogue of Application Programming Interfaces (APIs); (iv)
improving the availability, efficiency and accessibility of all digital public services with the aim of
increasing the level of adoption and users’ satisfaction, (v) strengthening Italy’s defences against the
risks posed by cybercrime, (vi) fostering the digital transformation of large central administrations;
(vii) tackling the digital divide by strengthening citizens’ digital skills. Reforms under this axis aim in
particular at (i) streamlining and accelerating the procurement process for Information and
Communication Technologies (ICT) solutions by the public administration; (ii) supporting the digital
transformation of the public administration, and (iii) removing obstacles to the adoption of cloud by
public administrations and streamlining data exchange processes between public administrations.
The investments and reforms under this component shall contribute to addressing the Country-
Specific Recommendations addressed to Italy in 2020 and 2019 on the need to “improve the
effectiveness of public administration, including by investing in the skills of public employees, by
accelerating digitalisation, and by increasing the efficiency and quality of local public services”
(Country-Specific Recommendation 3, 2019), and to “focus investment on the green and digital
transition, in particular on […] reinforced digital infrastructure to ensure the provision of essential
services” (Country-Specific Recommendation 3, 2020).
Axis 2 - Justice: The performance of the Italian justice system remains far from that of other Member
States in terms of duration of proceedings, as outlined in the latest report of the European Commission
on the efficiency of justice (CEPEJ). Axis 2 of component M1C1 of the recovery and resilience plan
contains measures that aim to make the judicial system more efficient by reducing the length of
proceedings and bringing Italy closer to the EU median. This component addresses the Country-
specific recommendations addressed to Italy in 2020 and 2019 on reducing the length of civil trials
and on improving the effectiveness of the fight against corruption (Country-specific recommendations
4, 2019 and 4, 2020). Furthermore, the digitisation of the justice system is also relevant for the digital
transition.
Axis 3 – Public administration: Axis 3 of component M1C1 of the recovery and resilience plan
contains measures that aim to reform the Italian public administration and improve administrative
capacity. Italy ranks below EU-27 average both for government effectiveness and for trust in
government. Italian public administration reforms were affected by a serious implementation gap of
top-down reforms and the scarce recognition and diffusion of valuable bottom-up innovations.
Administrative capacity is very low. Efforts to strengthen the strategic planning capacity, monitoring
and evaluation mechanisms, and evidence-based policymaking instruments should continue. The main
objective of this component is to enhance the administrative capacity of the Italian public
administrations at central and local levels, both in terms of human capital (selection, competences,
and careers) and in terms of simplification of administrative procedures. This section presents the
overarching structural human resources strategy, ranging from the selection processes to career paths.
The reform includes also actions to simplify procedures. Investments in new digital toolkits and
2
strengthened actions on lifelong learning are included in Component 1 of Mission 1. This component
addresses the Country-specific recommendations addressed to Italy in 2020 and 2019 on improving
the effectiveness of public administration (Country-specific recommendation 3, 2019 and Country-
specific recommendation 4, 2020).
Axis 4 – Public procurement and payments by the administration: Axis 4 of component M1C1 of
the recovery and resilience plan contains measures that aim to reform certain key aspects of the Italian
public procurement legislative framework and to reduce late payments by public administrations at
central, regional and local, as well as regional health authorities. The main objective of the reform is
to simplify public procurement rules, increase legal certainty for businesses and accelerate the award
of public contracts while maintaining procedural guarantees in terms of transparency and equal
treatment. These reforms support therefore the timely realization of the infrastructures and projects
financed by the Plan.
Axis 5 – Fiscal-structural reforms (Taxation and public expenditure): Axis 5 of component M1C1
of the recovery and resilience includes several reforms aimed at supporting the sustainability of Italy’s
public finances (country-specific recommendation 1, 2019). On the revenue side, the reforms aim at
improving the tax collection process, encouraging tax compliance and fight tax evasion, in order to
reduce compliance costs for taxpayers and increase revenues for the general government, contributing
to improving the sustainability of public finances. On the expenditure side, the reforms aim at
improving the efficiency of public expenditure, both at the central level, by strengthening the existing
framework for yearly spending reviews, and at the subnational level, by completing the reform of
fiscal relations across different levels of government.
A.1. Description of the reforms and investments for non-repayable financial support
Axis 1- Digitalization of the Public Administration
Investment 1.1 - Digital infrastructure
The objective of this investment is to ensure that the systems, datasets and applications of the public
administration are hosted in data centres with high quality standards for security, performance,
scalability, European interoperability and energy efficiency. The investment consists in the migration
of the datasets and applications of the public administration towards the PSN or towards secure
certified public cloud providers.
Investment 1.2 - Cloud enablement for local PA
The objective of this investment is to migrate the datasets and applications of a substantial part of the
local public administration to a secure cloud infrastructure, allowing each administration the freedom
to choose within a set of certified public cloud environments.
The measure also envisages a “migration as a service” support package to administrations
encompassing: (i) the initial assessment, (ii) the procedural/administrative support needed to launch
the effort, (iii) the negotiation of the necessary external support and (iv) the overall project
management over the course of execution. A team supervised by the Ministry for Technological
Innovation and Digital Transition (MITD) is expected to identify and certify a broad list of qualified
providers and to negotiate a set of standard support packages tailored to the size of the administration
and the services involved in the migration.
Investment 1.3 - Data and interoperability
The objective of this investment is to ensure the full interoperability of key datasets and services
across central and local public administrations. The measure consists in the set up of a National
Digital Data Platform (“Piattaforma Digitale Nazionale Dati”) enabling the interoperability of datasets
3
through a catalogue of Application Programming Interfaces (APIs) shared across central and local
administrations.
Investment 1.4 - Digital services and citizen experience
The objective of this investment is to develop an integrated and citizen-oriented ecosystem of digital
public services, ensure their widespread adoption across central and local administrations and enhance
overall user experience.
The measure :
(i) defines reusable service delivery models ensuring full accessibility requirements (Investment
1.4.1 - Citizen experience - Improvement of the quality and the usability of digital public
services);
(ii) increases the accessibility of digital public services (Investment 1.4.2 - Citizen inclusion:
Accessibility improvement of digital public services);
(iii) entails the adoption of the digital application for payments between citizens and public
administrations (PagoPa) and the adoption of the “IO” app (Investment 1.4.3 - Adoption scale
up of PagoPA platform services and the “IO” app);
(iv) fosters the adoption of National Digital Identity platforms (Sistema Pubblico di Identità
Digitale, SPID and Carta d’Identità Elettronica, CIE) and of the national registry (Anagrafe
nazionale della popolazione residente, ANPR) (Investment 1.4.4 - Adoption scale up of the
National Digital Identity platforms (SPID, CIE) and the national registry (ANPR));
(v) sets up a single platform for notifications (Investment 1.4.5 - Digitization of public notices);
(vi) entails the adoption of Mobility as a Service (MaaS) (Investment 1.4.6 - Mobility as a Service
for Italy, with this last measure being financed on the basis of non-repayable financial support).
Investment 1.5 - Cybersecurity
The objective of this investment is to strengthen Italy’s defences against the risks posed by
cybercrime, notably through the implementation of a ‘National Perimeter for Cyber Security’ (PSNC),
in line with the security requirements set out in the Directive (EU) 2016/1148 on security of network
and information systems (NIS Directive), and by strengthening national cyber-defence capabilities of
technical inspection and risk monitoring.
The measure envisages the development of a state-of-the-art, integrated system, tightly
interconnecting different entities across the country and connecting internationally with partners and
trusted technology providers. This is articulated on four pillars: (i) Strengthen front line capabilities
towards the public and companies/entities to manage alerts and actual publicly recognized events; (ii)
Build/strengthen the country’s inspection and audit capabilities of hardware and software used by
subjects with essential functions to certify trustworthiness/pre-empt threats; (iii) Power up units of law
enforcement and cyber units within the Police forces in charge of investigations of criminal activities;
(iv) Strengthen significantly cyber asset and human resources in charge of national security and
response to cyber threats.
Investment 1.6 - Digital transformation of large central administrations
The objective of this investment is to increase the efficiency and simplify the procedures of the main
central administrations – including (i) the Ministry of Interior, (ii) the Ministry of Justice, (iii) the
National Social Security Institute (INPS) and National Institute for Insurance against Accidents at
work (INAIL), (iv) the Ministry of Defence, (v) the Council of State, and (vi) the Finance Police. The
investment consists of the re-engineering or the digitisation of a set of processes or activities
orservices within their remit.
4
Investment 1.7 - Basic digital skills
The objective of this investment is to reduce the share of population at risk of digital exclusion via the
provision of digital education. The measure consists of the participation of individuals in the Digital
Civil Service and in digital education and/or digital facilitation activities.
Reform 1.1 - ICT Procurement
The objective of this reform is to ensure that the public administration may procure Information and
Communication Technologies (ICT) solutions in a more timely and more efficient way by
streamlining and accelerating the procurement process for ICT services and assets.
The implementation of the reform shall consist in three lines of actions. First, a single database
containing a white list of economic operators authorized to provide goods and services to public
administrations shall be set-up and a dedicated technological infrastructure shall be introduced to
allow the certification of suppliers. Second, a simplified approach (“fast track”) to streamline ICT
purchases for PNRR projects shall be adopted. Third, a digital procurement service shall be set up,
with the aim to (i) include only certified suppliers (economic operators may request at any time to be
certified in line with art. 64 of Directive 2014/24/EU); (ii) allow to quickly identify suppliers meeting
a specified need (e.g. through a configurator); (iii) provide an intuitive user experience for
administrations (e.g. clear description of the services offered, comparative evaluation of suppliers).
This overall setup shall build on the existing capabilities of CONSIP, the Italian state entity for
procurement.
Reform 1.2 - Transformation Support
The objective of this reform is to support the digital transformation of all central and local public
administrations through the set-up of a dedicated “Digital PA transformation office”. The
transformation office shall consist in a temporary technology competent resource pool that shall
orchestrate and support the migration effort and the centralized negotiation of “packages” of certified
external support.
In addition, the measure envisages the set up a company focused on software development &
operations management to support the digital step-up of central administrations. The transformation
office shall in particular support public administration in the implementation of Investments 1.1 to 1.7
included under this component and shall also support the implementation of investments and reforms
in digitalization of healthcare included in Mission 6.
Reform 1.3 - Cloud First and interoperability
The aim of this reform is to remove the obstacles to cloud adoption and streamline the bureaucracy
that slows down the data exchange processes between public administrations by introducing a set of
incentives and obligations aimed at facilitating the migration to cloud and removing procedural
constraints to the broad adoption of digital services.
The reform shall entail three lines of action. First, as cloud solutions shall drive cost efficiency in
spending in Information and communication technology (ICT), after a predefined “grace period” (e.g.
three-years after the launch of the transformation), administrations that did not adhere to the cloud
transformation shall see a restriction in their ICT spending budget.
Second, as part of the incentives for cloud migration, the current public accounting rules for expenses
related to cloud services shall be revised. Given that the migration to the cloud currently involves a
transfer of budgets from capital expenditures to operational expenditures, public accounting rules for
5
expenses related to cloud services shall be revised in order to not disincentivize cloud migration for
public administrations.
Third, norms related to data interoperability rules shall be revised, in compliance with the provisions
on open data and processing of personal data and current procedures for data exchange between
public administrations shall be simplified to streamline procedural aspects and speed up the
implementation of interoperability between public administration databases. Furthermore, digital
domicile shall be reviewed and integrated with the national resident registry (ANPR) to allow certain
and secure digital correspondence between citizens and public administrations.
Axis 2 - Justice
Reform 1.4 - Civil justice
The objective of this reform is to shorten the length of civil proceedings and address civil courts’
backlog. The reform consists of the adoption of legislative measures to reduce the number of
incoming cases in courts, simplify existing procedures, and increase courts’ productivity.
Reform 1.5 - Criminal justice
The objective of this reform is to shorten the length of criminal proceedings. The reform consists in
the adoption of actions that simplify existing procedures and increase courts’ productivity.
Reform 1.6 - Insolvency
The reform is aimed at digitalising and enhance insolvency proceedings introducing early warning
mechanisms prior to insolvency, the specialisation of courts and pre-courts institutions to manage all
phases of insolvency proceedings more effectively including through training and specialisation for
members of the judicial and administrative authorities.
Reform 1.7 - Tax courts
The aim of the reform is to make the enforcement of tax law more effective and to decrease the high
amount of appeals at the Court of Cassation.
Reform 1.8 - Digitalisation of the justice system
The objective of this reform is to digitise civil and criminal proceedings. This reform consists of the
introduction of a mandatory electronic filing of documents, the establishment of an electronic
workflow for civil proceedings, the digitalisation of the first instance criminal proceedings, and the
creation of a database of civil law decisions.
Investment 1.8 - Recruitment procedures for civil, criminal and administrative courts
The objective of this measure is to increase the quality of justice by supporting the activities of the
administrative, civil, and criminal Courts, as well as of the territorial and central services of the
Ministry of Justice responsible for the enforcement of the RRP and the digital transition in the justice
system. The investment consists of the temporary hiring of staff for the office of the trial and of
technical and administrative personnel supporting the implementation of RRP objectives.
6
Axis 3 – Public administration
Reform 1.9 - Public employment reform and simplification reform
The objective of this reform is to reinforce the public employment framework and simplify
administrative procedures to the benefit of businesses and citizens. The reform consists of the
adoption of a number of measures removing unnecessary obligations, introducing silent-consent
mechanisms, simplifying communication, uniforming regimes shared with Regions and
municipalities, making data on Sportello Unico Attività Produttive (SUAP) and Sportello Unico
Edilizia (SUE) accessible on the digital platform www.impresainungiorno.gov.it, and defining a set of
Key Performance Indicators (KPIs) to steer organizational change in administrations.
Reform 1.9bis - Reform for accelerating the implementation of cohesion policy
The reform aims to accelerating the implementation and efficiency of cohesion policy in
complementarity with the NRRP. It shall foresee the date of the approval of the strategic plan of the
single special economic zone. The national legislation requires the opinion of the Unified Conference
before its conversion into Law as provided for in the Legislative Decree n°281/1997. In accordance
with Article 9 of Regulation (EU) 2021/241, the reform may receive support from other Union
Programmes and instruments provided that such support does not cover the same cost. The RRF does
not cover any costs of the reform.
Investment 1.9 - Provide technical assistance and strengthen capacity building for the
implementation of the Italian recovery and resilience plan
The objective of this investment is to reinforce administrative capacity for the implementation of the
Italian Recovery and Resilience Plan (RRP). The investment consists of the temporary recruitment of
a pool of experts that will provide technical assistance to administrations and reinforce their capacity
to implement specific initiatives envisaged under the RRP and includes training programmes.
Axis 4 – Public procurement and payments by public administrations
Reform 1.10 - Reform of the public procurement legislative framework
The objective of this reform is to enhance the qualification and professionalisation of contracting
authorities, increase competition, simplify and digitalize the procedures of central purchasing bodies,
and operationalise the national e-Procurement System. To this end, the reform includes the adoption
of legal acts, including amendments to the Public Procurement Code.
Reform 1.11 - Reduction of late payments by public administrations and health authorities
The objective of the reform is to address bottlenecks causing delays in the execution of payments
made by central, regional, local, and health Italian public administrations and authorities towards
businesses, notably through the adoption of structural actions and targeted legislative measures.
7
Axis 5 – Fiscal-structural reforms (Taxation and public expenditure)
Reform 1.12 - Reform of the tax administration
The objective of this reform of the tax administration is to encourage tax compliance, increase the
efficacy of audits and controls, and reduce compliance costs for taxpayers, through the adoption and
enforcement of targeted legislative and regulatory measures.
Reform 1.13 - Reform of the spending review framework
The objective of this reform is to increase the efficacy of the national spending review framework.
The reform consists in the commitment to undertake yearly spending reviews over the 2023-2025
period and to improve the practice of green and gender budgeting.
Reform 1.14 - Reform of the subnational fiscal framework
The objective of this reform is to increase the transparency of fiscal relations across the different
levels of government. The reform consists in the definition of the essential levels of services for the
“fiscal federalism” for regions with ordinary status in at least two policy areas and the adoption of
legals acts defining the “fiscal federalism” for provinces and metropolitan cities.
Reform 1.15 - Reform of public accounting rules
The objective of this reform is to implement a single accrual accounting system for the public sector,
net of State-owned companies. The reform consists in the adoption of the conceptual framework, the
set of accrual accounting standards and the multidimensional chart of accounts, as well as in the
delivery of trainings for the transition to the new accrual accounting system.
Investment 1.10 - Support to qualification and eProcurement
This investment shall, within the framework of the Public Buyers Professionalization Strategy, set up
a procurement support function dedicated to contracting authorities to fulfil the requirements of
Annex II.4 of the Public Procurement Code and to support them in the eProcurement process, backing
up the acquisition of digital skills and providing technical support in the adoption of the digitalization
of public procurement, including the use of dynamic purchasing systems.
8
A.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
M1C1-1 Reform 1.1: ICT
Procurement Milestone
Entry into force
of law decrees
for reform 1.1
‘ICT
Procurement’
Provision in the
law indicating the
entry into force of
law decree for ICT
procurement
reform
N/A N/A N/A Q4 2021
The necessary legal acts shall include
legislative interventions in the
simplifications law decree (‘Decreto Legge
Semplificazioni’). These shall stipulate:
(i) The possibility of using procedure
referred to in Article 48, paragraph 3, of
the Public Contracts Code also for
contracts above the thresholds referred to
in Article 35 of the Public Contracts Code
for purchases relating to the purchase of
computer goods and services, in particular
based on cloud technology, as well as
connectivity services, financed in whole or
in part with the resources provided for the
implementation of PNRR projects;
(ii) Interoperability between the various
databases managed by the certifying
bodies involved in the process of verifying
the requirements referred to in Article 80
of the Public Contracts Code;
(iii) The establishment of a virtual file of
economic operators in which are present
the data for the verification of the absence
of reasons for exclusion referred to in
Article 80, enabling the definition of a
white list of economic operators for whom
the verification has already been carried
out.
9
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
M1C1-2
Reform 1.3:
Cloud First and
Interoperability
Milestone
Entry into force
of law decrees
for reform 1.3
‘Cloud First and
Interoperability’
Provision in the
law indicating the
entry into force of
law decree for
cloud first and
interoperability
reform
N/A N/A N/A Q4 2021
The necessary legal acts shall include:
Implementing regulatory acts concerning
in particular (i) the Agenzia per l'Italia
digitale (AgID) regulation on Polo
Strategico Nazionale (PSN) (provided for
in art.33-septies of Law Decree 179/212)
and (ii) AgID Guidelines on interoperability
(provided for in articles 50 and 50 ter of
the Codice dell'Amministrazione Digitale
(CAD).
Amendments to art. 50 of the CAD:
(i) abolition of the obligation to enter into
framework agreements for administrations
accessing the national digital data
platform;
(ii) clarifications on the issue of privacy:
the transfer of data from one information
system to another does not change the
ownership of the data and processing,
without prejudice to the responsibilities of
the public administrations that receive and
process the data as autonomous data
controllers.
Amendments to Decreto del Presidente
della Repubblica (DPR) 445/2000
regarding access to data:
(i) repeal of the authorization required for
10
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
direct access to data;
(ii) removal of reference to framework
agreements in art. 72.
Amendments to art. 33-septies of Law
Decree 179/2012:
(i) introduce the possibility for AgID to
regulate with the Centri Elaborazione Dati
(CED) and Cloud Regulations the terms
and methods with which public
administrations must carry out CED
migrations;
(ii) introduce sanctions for failure to
comply with obligations to migrate to the
cloud.
M1C1-3
Investment 1.1:
Digital
infrastructure
Milestone
Completion of
the Polo
Strategico
Nazionale (PSN)
Cloud deployment
report, by Ministry
for Technological
Innovation and
Digital Transition
(MITD)
N/A N/A N/A Q4 2022
The full completion of the overall project
shall be reached when all the targeted
public administrations have completed the
moving of identified racks towards the
Polo Strategico Nazionale (PSN) and the
testing of four data centers is successfully
completed, which allows the start of the
migration process of the datasets and
applications of targeted public
administrations towards the PSN.
M1C1-4 Investment
1.3.1: National
Digital Data
Milestone National Digital
Data Platform
Report by Ministry
for Technological
Innovation and
N/A N/A N/A Q4 2022 The platform shall allow the agencies to:
- publish their Application Programming
11
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
Platform operational Digital Transition
(MITD)
demonstrating the
launch of the
National Digital
Data platform
Interfaces (APIs) on the Platform's API
Catalogue;
- establish and sign digital interoperability
agreements via the Platform;
- authenticate and authorize APIs access
using the Platform's functionalities;
- validate and assess the compliance with
the national interoperability framework.
M1C1-5 Investment 1.5:
Cybersecurity Milestone
Creation of the
new National
Cyber Security
Agency
Administrative
constitution act N/A N/A N/A Q4 2022
The milestone shall be achieved with (1)
the conversion into law of the Law Decree
constituting the National Cyber Security
Agency, currently under finalization; (2)
the publication in the Official Gazette of
the Prime Ministerial Decree (Decreto del
Presidente del Consiglio dei Ministri,
DPCM) containing the internal regulation
of the National Cyber Security Agency.
M1C1-6 Investment 1.5:
Cybersecurity Milestone
Initial
deployment of
the national
cybersecurity
services
Report
demonstrating the
full architecture of
the national
cybersecurity
services
N/A N/A N/A Q4 2022
The milestone shall be achieved with the
definition of the detailed architecture of
the whole ecosystem of the national
cybersecurity architecture (that is, a
national Information Sharing and Analysis
Center (ISAC), a network of Computer
emergency response teams (CERTs), a
national HyperSOC, the High
Performance Computing integrated with
the Artificial Intelligence/Machine Learning
12
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
(AI/ML) tools to analyse national level
cybersecurity incidents).
M1C1-7 Investment 1.5:
Cybersecurity Milestone
Startup of the
network of
cybersecurity
screening and
certification
laboratories
Documentation
provided
demonstrating the
identified
processes and
procedures to be
shared among
labs and reporting
provided
demonstrating the
activation of at
least one lab
N/A N/A N/A Q4 2022
The milestone shall be achieved with the:
(i) Identification by the National
Cybersecurity Agency of where the
screening and certification laboratories
and centers will be created, the experts’
profiles to be recruited, the full definition of
processes and procedures to be shared
among labs.
(ii) Activation of one lab.
The activities created to the constitution
and activation of the scrutiny labs shall be
supervised by Ministero dello Sviluppo
Economico (MISE) with the CVCN
(National cybersecurity screening and
certification laboratory) and integrated
with the Evaluation Center (CV) by the
Ministry of Interior and the Ministry of
Defence.
M1C1-8 Investment 1.5:
Cybersecurity Milestone
Activation of a
Central Audit
Unit for PSNC &
NIS security
measures
Reporting provided
demonstrating the
launch of the
Central Audit Unit
N/A N/A N/A Q4 2022
An internal unit shall be appointed within
the National Cybersecurity Agency, with
the mandate for performing the activities
of the Central Audit Unit that will account
for the PSNC & NIS Security measures.
The processes, logistics and operation
arrangements shall be formalized into
13
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
adequate documentation with specific
focus on the operating processes, i.e.
rules of engagement, auditing and
reporting procedures.
The IT tools shall gather, manage and
analyse the audit data and shall be
developed and used by the Audit Unit.
Documentation reporting the completion
of the development of the tools shall be
provided.
M1C1-9 Investment 1.5:
Cybersecurity Target
Support to the
upgrade of
security
structures T1
N/A Number 0 5 Q4 2022
At least five strengthening interventions
upgrading security structures completed in
the National Security Perimeter for Cyber
(PSNC) and Network and Information
Systems (NIS) sectors.
Intervention types include upgrades to
Security Operating Centers (SOCs),
Cyber boundary defence improvements
and Internal monitoring and control
capabilities. Interventions shall focus on
Healthcare, Energy and Environmental
(Drinking Water Supply) sectors.
M1C1-10
Reform 1.2:
Transformation
support
Milestone
Entry into force
of the setup of
Transformation
Team and
NewCo
Provision in the
legal act indicating
the entry into force
of legal act to
create the
N/A N/A N/A Q4 2022
For the setup of the Transformation office,
the necessary legal acts shall include:
- The Publication of the Law Decree “reclutamento” (already approved by the Council of Ministers n. 22 of June
14
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
Transformation
Office and entry
into force of legal
act to create the
NewCo
4th 2021 and published on the Official Journal (“Gazzetta Ufficiale”) on June 10th 2021);
- The publication of a call for expression of interest;
- The selection and conferment of the assignment to the experts (on a temporary basis for the duration of the RRF).
For the NewCo, the key steps required
shall include:
- Legislative authorization; - Decreto del Presidente del Consiglio
dei Ministri (DPCM) authorizing the establishment of the company and setting the objectives, share capital, duration and directors to the company;
- Institution of the company with notarial deed;
- Acts required to make the company operational - articles of association and various regulations.
M1C1-11
Investment
1.6.6:
Digitization of
the Finance
Police
Target
Finance Police -
Purchase of
professional
data science
services T1
N/A Number 0 5 Q1 2023
Purchase of professional data science
services by contracting with a consulting
service provider involving five human
resources in total responsible both for
designing the data architecture and for
writing the algorithms of the Big Data
Analysis unit. Publication of awarded
contract for the purchase of data science
15
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
services in compliance with the ’Do no
significant harm’ Technical Guidance
(2021/C58/01) through the use of an
exclusion list and the requirement of
compliance with the relevant EU and
national environmental legislation and
release on a nationwide scale of new tools
on the first analysis module (IT backbone).
M1C1-12
Investment
1.3.2:Single
Digital Gateway
Target Single Digital
Gateway N/A Number 0 19 Q4 2023
The 19 prioritized administrative
procedures applicable in Italy out of the 21
defined in EU Regulation 2018/1724 are
fully compliant with the requirements
defined in Article 6 of the EU Regulation
2018/1724. More specifically: (a) the
identification of users, the provision of
information and supporting evidence,
signature and final submission shall all be
carried out electronically at a distance,
through a service channel which enables
users to fulfil the requirements related to
the procedure in a user-friendly and
structured way; (b) users shall be
provided with an automatic
acknowledgement of receipt, unless the
output of the procedure is delivered
immediately; (c) the output of the
procedure shall be delivered electronically,
or where necessary to comply with
applicable Union or national law, delivered
16
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
by physical means; (d) users shall be
provided with an electronic notification of
completion of the procedure.
M1C1-13
Investment
1.4.6:
Mobility as a
Service for Italy
Milestone
Mobility as a
Service solutions
M1
Report by
Ministero delle
Infrastrutture e
della Mobilità
Sostenibili (MIMS)
in collaboration
with universities
describing the
implementation
and assessing the
results of the three
pilot projects
N/A N/A N/A Q4 2023
Three pilot projects aimed at testing
Mobility as a Service solutions in
technologically advanced metropolitan
cities have been implemented.
Each solution has been used by at least
1 000 users during the pilot period.
Each pilot project shall be open to a
minimum of 1 000 users, who shall be
able to access it on a voluntary basis and
at their own expense and give the
individual assessment, with the possibility
to choose and purchase mobility services
among those available on the platform.
The MaaS service, through a single
technological platform, shall suggest to
the citizen-user the best travel solution
based on his needs, exploiting the
integration between the different mobility
options available (local public transport,
sharing, cab, car rental) to optimize the
travel experience both in terms of
planning (intermodal route planner and
real-time information on times and
distances), and in terms of utilization
17
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
(booking and payment of services).
M1C1-14bis
Reform 1.9bis:
Reform for
accelerating the
implementation
of cohesion
policy
Milestone
Entry into force
of the national
legislation for
accelerating the
implementation
of cohesion
policy
Provision in the
law indicating the
entry into force of
the national
legislation for
accelerating the
implementation of
cohesion policy
N/A N/A N/A Q1 2024
Entry into force of national legislation that
identifies, within the framework of the
Partnership Agreement and for all the
current Programmes, the arrangements
necessary to accelerate and improve the
implementation of cohesion policy.
In order to ensure the institutional
dialogue and cooperation, as well as a
shared understanding of the necessary
actions, by 31 December 2023, the
Government shall set up a technical
working group with the managing
authorities of all regional and national
programmes within the Cabina di regia
PNRR, without prejudice to national
legislation on the Unified Conference.
The legislation shall set out the arrangements necessary to prioritise interventions in the following strategic sectors, in strict coherence with the planning documents defined for the relevant enabling conditions and to concretely implement them, including intervening specifically to strengthen administrative capacity, in these sectors: - Water; - infrastructures for hydrogeological risk and environmental protection;
18
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
- Waste; - Transport and sustainable mobility; - Energy; - Support to business development and attractiveness, also for the digital and green transitions.
M1C1-15
Investment
1.6.6:
Digitization of
the Finance
Police
Target
Finance Police -
Purchase of
professional
data science
services T2
N/A Number 5 10 Q1 2024
Purchase of professional data science
services by contracting with a consulting
service provider involving five additional
human resources (ten in total) responsible
both for designing the data architecture
and for writing the algorithms of the Big
Data Analysis unit. Publication of awarded
contract for the purchase of data science
services in compliance with the ’Do no
significant harm’ Technical Guidance
(2021/C58/01) through the use of an
exclusion list and the requirement of
compliance with the relevant EU and
national environmental legislation and
release on a nationwide scale of new tools
on the first analysis module (IT backbone).
M1C1-17
Investment 1.1:
Digital
infrastructure
Target
Migration to the
Polo Strategico
Nazionale T1
N/A Number 0 100 Q3 2024
At least 100 Central Public
Administrations and Local Healthcare
Authorities (Aziende Sanitarie
Locali/Aziende ospedaliere) shall fully
migrate at least one service of the
administration (systems, dataset and
applications included) to the infrastructure
(Polo Strategico Nazionale). Fully
19
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
migrated can imply for each institution a
mix of: not-cloud-ready in pure hosting,
lift-and-shift migrations, upgrade to
Infrastructure-as-a-Service (IaaS),
Platform-as-a-Service (Paas) or Software-
as-a-Service (SaaS). The migration to the
Polo Strategico Nazionale can be
executed in different ways according to
the state of art of on-premise software’s IT
architecture owned by each migrating
public administration. These strategies
can vary from pure hosting and lift-and-
shift migrations for not-cloud-ready
software to a migration to IaaS, PaaS or
SaaS for cloud-ready software. The PSN
shall offer to each migrating public
administration all of the migration
strategies that are eligible to consider the
target “migration to the Polo Strategico
Nazionale” achieved.
Total public administrations "in scope"
include:
• Central Public Administrations
accounting for the largest share of
Information and Communication
Technologies (ICT) spending (such as
National Institute of Social Security and
Ministry of Justice);
20
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
• Central Public Administrations hosting
data in outdated data centers as per
survey recently run on "cloud readiness";
• Local Healthcare Authorities (Aziende
Sanitarie Locali/Aziende Ospedaliere)
primarily located in Central and Southern
Italy lacking adequate infrastructure to
ensure data security.
M1C1-18
Investment
1.3.1: National
Digital Data
Platform
Target
APIs in National
Digital Data
Platform T1
N/A Number 0 3 000 Q4 2024
This target consists of reaching at least
3 000 Application Programming Interfaces
(APIs) created by the public
administrations, published in the API
catalogue and integrated with the National
Digital Data Platform. The published APIs
shall impact several areas which may
include but are not limited to:
(i) Social security and welfare services, procurement service management, or
core national registries (for example
Population Registry and Car Licence
Registry);
Each API implementation and
documentation shall comply with the
national interoperability standards. The
National Digital Data Platform framework
shall provide functionalities to assess that
compliance.
21
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
M1C1-19 Investment 1.5:
Cybersecurity Target
Support to the
upgrade of
security
structures T2
N/A Number 5 50 Q4 2024
At least 50 strengthening interventions
completed in the National Security
Perimeter for Cyber (PSNC) and Network
and Information Systems (NIS) sectors.
Intervention types include, for example,
Security Operating Centers (SOCs),
Cyber boundary defence improvements
and Internal monitoring and control
capabilities in compliance with NIS and
PSNC requirements. Interventions in the
NIS sectors shall pose particular focus on
Healthcare, Energy and Environmental
(Drinking Water Supply and waste
management) sectors.
M1C1-20 Investment 1.5:
Cybersecurity Milestone
Full deployment
of national
cybersecurity
services
Report
demonstrating the
complete
activation of the
national
cybersecurity
services
N/A N/A N/A Q4 2024
This milestone shall be completed with the
activation of territorial Computer
emergency response teams (CERTs)
which shall be interconnected with the
Italian Computer Security Incident
Response Team (CSIRT), the activation of
the Information Sharing and Analysis
Center (ISAC), the integration of at least 5
Security Operating Centers (SOCs) with
the national HyperSOC, the full operation
of the cybersecurity risk management
services, including those for supply chain
analysis and cyber risk insurance
services.
22
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
M1C1-21 Investment 1.5:
Cybersecurity Milestone
Completion of
the network of
cybersecurity
screening and
certification
laboratories,
Evaluation
Centers
Reporting
provided,
demonstrating the
full activation of at
least 10
laboratories and of
2 Evaluation
Centers (CV)
N/A N/A N/A Q4 2024 Activation of at least 10 screening and
certification laboratories and of 2
Evaluation Centers (CV).
M1C1-22 Investment 1.5:
Cybersecurity Milestone
Full operation of
the Central Audit
Unit for PSNC &
NIS security
measures with at
least 30
inspections
completed
Reporting
provided,
Inspection reports
N/A N/A N/A Q4 2024 Full operation of the Central Auditing Unit
with at least 30 inspections completed.
M1C1-23
Investment
1.4.6: Mobility as
a Service for
Italy
Milestone
Mobility as a
Service solutions
M2
Mobility as a
Service pilot
projects
N/A N/A N/A Q2 2025
Seven pilot projects, of which at least
three in the South, shall test Mobility as a
Service (MaaS) solutions.
Mobility as a Service shall provide users,
through a single technological platform,
with the best travel options based on their
needs, by integrating different mobility
options (for example, public transport,
sharing services, taxis, car rental) and
optimising travel planning and the overall
user experience.
23
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
M1C1-24 Investment
1.7.1: Digital
Civil Service
Target Individuals
participated in
the Digital Civil
Service
N/A Number 0 8 300 Q4 2025 At least 8 300 individuals participated in
the Digital Civil Service within
organizations registered in the national
register of Universal Civil Service
organizations. The Digital Civil Service
focuses on digital education and/ or digital
facilitation activities.
M1C1-25
Investment
1.6.6:
Digitization of
the Finance
Police
Milestone
Evolve the
information
systems in use
for fighting
economic crime
IT systems with
new functionalities N/A N/A N/A Q2 2025
Release of new functionalities of the
information systems in use for fighting
economic crime.
M1C1-27
Investment
1.3.1: National
Digital Data
Platform
Target
APIs in National
Digital Data
Platform T2
N/A Number 3 000 7 000 Q4 2025
This target consists of reaching at least an
additional 4 000 Application Programming
Interfaces (APIs) published in the API
catalogue (for a total of 7 000).
The published APIs shall impact several
areas which may include but are not
limited to:
(i) national data related to recruitment,
retirement, school and university enrolment
(for example, National Student Registry
and Public Administration Registry), fiscal
compliance, or national information system
for medical data and sanitary emergencies.
Each API implementation and
documentation shall comply with the
24
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
national interoperability standards. The
National Digital Data Platform framework
shall provide functionalities to assess that
compliance.
M1C1-28
Investment
1.7.2: Network of
digital facilitation
services
Target
Number of
citizens
participating in
digital education
and/or facilitation
initiatives
provided by
digital facilitation
centres
N/A Number 0 2 000 000 Q2 2026
At least 2 000 000 citizens, of which 30%
located in the South of Italy, participated in
digital education and/or facilitation
initiatives as per registration on the
‘Facilita’ platform of the Department of
Digital Transformation.
M1C1-29
Reform 1.4:
Reform of the
civil justice
Milestone
Entry into force
of enabling
legislation for the
civil Justice
reform
Provision in the
law indicating the
entry into force of
the enabling
legislation
N/A N/A N/A Q4 2021
Enabling legislation shall include at least
the following measures: i) Introduction of
simplified procedure at first instance/trial
level and strengthening the application of
'filtering procedures’ at appeal level,
including the extended use of simplified
procedures and the range of cases where
a single judge is competent to adjudicate;
ii) secure the actual implementation of
binding timeframes for procedures and a
calendar for gathering of evidence and
filing electronically any relevant act and
document; iii) reform the use of mediation
and alternative dispute resolution together
with assisted mediation, arbitration and
25
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
any other possible alternative to make
these institutes more effective in deflating
pressure on the civil justice system,
including through incentives; iv) reform the
procedure for forced execution to reduce
the existing average time including
making the enforcement of amounts
declared due faster and less expensive;
reform the current system of quantification
and recoverability of legal fees to reduce
frivolous litigations ; v) introduce a
monitoring system at Court level and
increase the productivity of civil courts
through incentives to ensure reasonable
length of proceedings and uniform
performances across courts.
M1C1-30
Reform 1.5:
Reform of
criminal justice
Milestone
Entry into force
of enabling
legislation for
criminal justice
reform
Provision in the
law indicating the
entry into force of
the enabling
legislation
N/A N/A N/A Q4 2021
Enabling legislation which shall include at
least the following measures: i) a
reviewed notification system, ii) a broader
use of simplified procedures, iii) a broader
use of electronic filing of documents, iv)
simplified rules on evidence, v) the
definition of time limits for the duration of
preliminary investigation and measures to
avoid stagnation in the investigative
phase, vi) extension of the possibility to
extinguish the crime if damages have
been repaid, vii) introduction of a
monitoring system at Court level and
26
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
increase the productivity of criminal courts
through incentives to ensure reasonable
length of proceedings and uniform
performances across courts.
M1C1-31
Reform 1.6:
Reform of
insolvency
framework
Milestone
Entry into force
of enabling
legislation for
insolvency
reform
framework
Provision in the
law indicating the
entry into force of
the enabling
legislation
N/A N/A N/A Q4 2021
The insolvency reform shall include at
least the following measures: i) review
out-of-court settlement arrangements to
identify areas in which further
improvements may be necessary in order
to incentivise the concerned parties to
make enhanced use of such proceedings;
ii) put in place early warning mechanisms
and access to information prior to the
insolvency phase; iii) shift towards
specialisation of courts (commercial law,
insolvency division/chamber) as well as
pre-court institutions to manage
insolvency proceedings in insolvency; iv)
allow secured creditors to be paid first
(before tax claims and employee claims);
v) allow businesses to grant a non-
possessory security right. As complement
to the reform of insolvency, training and
specialisation for members of the judicial
and administrative authorities dealing with
procedures concerning restructuring shall
be ensured, as well as the overall
digitalisation of restructuring and
insolvency proceedings and the creation
27
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
of an online platform for the out-of-court
resolution of disputes, particularly in the
pre-insolvency phase, the use of which
shall be incentivised to reduce the burden
of the judiciary (pre-insolvency
restructuring applications, promoting
multilateral restructurings and allowing for
pre-approved automated restructuring
procedures and resolutions for low value
cases) shall be ensured. Such an online
platform shall also ensure interoperability
with banks’ IT systems, as well as other
public authorities and databases, so as to
ensure a swift, electronic exchange of
documentation and data between debtors
and creditors. To this purpose, the
applicant (the debtor) would give consent
to exchange their personal data in
compliance with GDPR and this provision
should be included in the law. The reform
shall set up a collateral registry.
M1C1-32
Investment 1.8:
Recruitment
procedures for
civil, criminal
and
administrative
courts
Milestone
Entry into force
of special
legislation
governing
National
Recovery and
Resilience Plan
recruitment
Provision in the
law indicating the
entry into force of
the special
legislation
governing National
Recovery and
Resilience Plan
N/A N/A N/A Q4 2021
Approve special legislation governing
National Recovery and Resilience Plan
recruitment with authorisation to advertise
and recruit.
28
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
recruitment
M1C1-33
Investment 1.8:
Recruitment
procedures for
administrative
courts
Target
Start of the
recruitment
procedures for
administrative
courts
N/A Number 0 168 Q2 2022
Start the recruitment procedures of at
least 168 units of personnel for the Trial
office and Administrative Courts and place
units into service. The baseline shall be
the number of personnel in service on
31 December 2021.
M1C1-34
Investment 1.8:
Recruitment
procedures for
the office of trial
for civil and
criminal Courts
Target
Start of the
recruitment
procedures for
civil and criminal
courts
N/A Number 0 8 764 Q4 2022
Start the recruitment procedures of at
least 8 764 units of personnel for the office
of trial for civil and criminal Courts and
place units into service. The baseline shall
be the number of personnel at the end of
2021.
M1C1-35
Reform 1.7:
Reform of tax
courts
Milestone
Comprehensive
reform of tax
courts of first
and second
instance
Provision in the
law indicating the
entry into force of
the revised legal
framework
N/A N/A N/A Q4 2022
The revised legal framework shall make
the enforcement of tax law more effective
and decrease the high amount of appeals
at the Court of Cassation.
M1C1-36
Reforms 1.4, 1.5
and 1.6: Reform
of civil and
criminal justice
and insolvency
reform
Milestone
Entry into force
of delegated
acts for the civil
and criminal
justice reforms
and of the
insolvency
reform
Provision in the
delegated acts
indicating the entry
into force of the
delegated acts
N/A N/A N/A Q4 2022
Entry into force of all delegated acts
whose contents are indicated in the
enabling legislation for the civil and
criminal justice reforms and for the
insolvency reform.
29
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
M1C1-37
Reforms 1.4 and
1.5: Reform of
civil and criminal
justice
Milestone
Entry into force
of the civil and
criminal justice
reform
Provision in the
secondary acts
indicating the entry
into force of the
secondary acts
N/A N/A N/A Q2 2023
Complete the adoption of all regulations
and secondary sources of legislation
necessary for the effective application of
the enabling laws for justice reforms.
M1C1-38
Reform 1.8:
Digitalisation of
Justice
Milestone
Digitalisation of
the justice
system
Provision in the
primary and
secondary acts
indicating the entry
into force of the
corresponding acts
N/A N/A N/A Q4 2023
The mandatory electronic filing of all
documents and full electronic workflow for
civil proceedings shall be established.
First instance criminal proceedings
digitalised (excluding preliminary hearing
office). Creation of a free, fully accessible
and searchable database of civil decision
according to the legislation.
M1C1-38bis
Reform 1.8:
Digitalisation of
Justice
Milestone
Digitalisation of
the justice
system
First instance
criminal
proceedings are
digitalised and the
PNR, PDP and
APP are
interoperable
N/A N/A N/A Q4 2025
Digitalization of first instance criminal
proceedings up to the concluding act
through the “portale delle notizie di reato”
(PNR), “portale dei depositi penali” (PDP)
and “applicativo processo penale” (APP).
The platforms shall be interoperable with
each other.
M1C1-39
Investment 1.8:
Recruitment
procedures for
civil and criminal
courts
Target
Recruitment or
extension
procedures for
civil and criminal
courts and
territorial and
central services
of the Ministry of
N/A Number 0 10 000 Q2 2024
Complete the recruitment or the extension
procedures of at least 10 000 units of
personnel for the office of trial and the
technical administrative personnel and
place them in service.
Only recruitments or extension
procedures that have been completed
30
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
Justice
responsible for
the
implementation
of the RRP
since 1 January 2022 shall count towards
this target.
M1C1-40
Investment 1.8:
Recruitment
procedures for
administrative
courts
Target
Recruitment or
extension
procedures for
administrative
courts
N/A Number 0 158 Q2 2024
Complete the recruitment or the extension
procedures of at least 158 units of
personnel for the Trial office and
Administrative Courts and place units into
service. Only recruitments or extension
procedures that have been completed
since 1 January 2022 shall count towards
this target.
M1C1-41
Investment 1.8:
Recruitment
procedures for
administrative
courts
Target
Reduction of
backlog cases
for
Administrative
Regional Courts
N/A Percentage 100 75 Q2 2024
Reduce by 25% the number of pending
cases in 2019 (109 029) in Administrative
Regional Courts (administrative courts of
first instance).
M1C1-42
Investment 1.8:
Recruitment
procedures for
administrative
courts
Target
Reduction of
backlog cases
for the Council of
State
N/A Percentage 100 65 Q2 2024 Reduce by 35% the number of pending
cases in 2019 (24 010) at the Council of
State (second instance).
M1C1-43
Reform 1.4:
Reform of civil
justice
Target
Reduction of
backlog cases
for Civil Ordinary
Courts (first
N/A Percentage 100 5 Q4 2024
Reduce by 95% the number of pending
cases on 31 January 2020 (333 218) in
the Civil Ordinary Courts (first instance).
The baseline shall be the number of cases
31
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
instance) pending for more than three years in front
of the Civil Ordinary courts (on 31 January
2020).
M1C1-44
Reform 1.4:
Reform of civil
justice
Target
Reduction of
backlog cases
for the Civil
Court of Appeal
(second
instance)
N/A Percentage 100 5 Q4 2024
Reduce by 95% the number of pending
cases on 31 January 2020 (97 251) in the
Civil Courts of Appeal (second instance).
The baseline shall be the number of cases
pending for more than two years in front
the Civil Courts of Appeal (on
31 January 2020).
M1C1-37bis
Reform 1.4:
Reform of civil
justice
Milestone
Entry into force
of measures
aimed at
reducing backlog
Provision in the
law indicating the
entry into force of
primary legislation
and secondary
acts to reduce
backlog
Q1 2024
Entry into force of primary legislation and
secondary sources of legislation to allow
for the:
i. Strengthening of the trial offices, including by means of incentives, to attract and retain the units of personnel hired on the basis of the recruitment scheme for the National Recovery and Resilience Plan;
ii. Creation of incentives to: (1) support less efficient courts in reducing the civil justice backlog; (2) reward judicial offices that achieve the specific annual objectives of reducing the number of pending cases in the civil justice system.
M1C1-45 Reforms 1.4:
Reform of civil Milestone Reduction in the
length of civil
Publication of a
report by the N/A N/A N/A Q2 2026 Report by the Italian National Institute of
Statistics (ISTAT) confirming a reduction
32
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
justice proceedings Italian National
Institute of
Statistics (ISTAT)
of the disposition time by 40% of all
instances of civil and commercial litigious
cases compared to 31 December 2019
(2 512 days). The report shall be
accompanied by an Annex containing the
underlying data.
M1C1-46
Reform 1.5:
Reform of
criminal justice
Milestone
Reduction in the
length of criminal
proceedings
Publication of a
report by the
Italian National
Institute of
Statistics (ISTAT)
N/A N/A N/A Q2 2026
Report by the Italian National Institute of
Statistics (ISTAT) confirming the reduction
by 31 December 2025 of the disposition
time by 25% of all instances of criminal
cases compared to 31 December 2019
(1 398 days). The report shall be
accompanied by an Annex containing the
underlying data.
M1C1-47
Reform 1.4:
Reform of civil
justice
Target
Reduction of
backlog cases
for the Civil
Ordinary Courts
(first instance)
N/A Percentage 100 10 Q2 2026
Reduce by 90% the number of pending
cases that had been opened between
1 February 2017 and 31 December 2022
and that were still open as of
31 December 2022 in the Civil Ordinary
Courts (first instance).
M1C1-48
Reform 1.4:
Reform of civil
justice
Target
Reduction of
backlog cases
for the Civil
Court of Appeal
(second
instance)
N/A Percentage 100 10 Q2 2026
Reduce by 90% the number of pending
cases that had been opened between
1 February 2018 and 31 December 2022
and that were still open as of
31 December 2022 in the Civil Courts of
Appeal (second instance).
M1C1-49 Investment 1.8: Target Reduction of N/A Percentage 100 20 Q4 2025 Reduce by 80% the overall number of
33
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
Recruitment
procedures for
administrative
courts
backlog cases
for
Administrative
Regional Courts
(first instance)
pending cases that are still open as of
30 June 2023 across all Administrative
Regional Courts (administrative court of
first instance) (102 144).
M1C1-50
Investment 1.8:
Recruitment
procedures for
administrative
courts
Target
Reduction of
backlog cases
for the Council of
State
N/A Percentage 100 30 Q4 2025
Reduce by 70% the number of pending
cases that are still open as of
30 June 2024 in the Council of State
(second instance) (12 287).
M1C1-51
Reform 1.9:
Reform of the
public
administration
Milestone
Entry into force
of primary
legislation on the
governance of
the Italian
recovery and
resilience plan
Provision in the
law indicating the
entry into force of
the law
N/A N/A N/A Q2 2021
The primary legislation shall concern, as a
minimum:
1) Coordination and monitoring of the
Italian recovery and resilience plan
projects at central level;
2) Definition and separation of
competences and endorsement of the
relevant mandates of the different bodies
and administrations involved in the
coordination, monitoring and
implementation of the Italian recovery and
resilience plan;
3) Definition of a system for the early
detection of implementation issues;
4) Ex-ante definition of an enforcement
mechanism to solve implementation
34
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
issues and avoid delays, in particular vis-
à-vis the different levels of
administrations;
5) Definition of the staff (number and
expertise) dedicated to the coordination,
monitoring and implementation of the
Italian recovery and resilience plan in the
administrations involved;
6) The definition of technical assistance
provided to the administrations involved in
Italian recovery and resilience plan
implementation, notably at the local level,
ensuring the build-up of administrative
capacity within the public administration;
7) A delineation of “fast-track” procedures
for the implementation of the Italian
recovery and resilience plan and the
timely absorption of funds;
8) Audit and control organization and
procedures for the Italian recovery and
resilience plan.
M1C1-52
Reform 1.9:
Reform of the
public
administration
Milestone
Entry into force
of primary
legislation on
simplification of
administrative
procedures for
Provision in the
law indicating the
entry into force of
the law
N/A N/A N/A Q2 2021
The measures shall include:
1) the removal of critical bottlenecks
concerning in particular the state and
regional Environmental Impact Evaluation,
the authorization of new waste recycling
plants, the authorization procedures for
35
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
the
implementation
of the Italian
recovery and
resilience plan.
renewable energy and those necessary to
achieve energy efficiency of buildings (so
called Super Bonus) and urban
regeneration. Specific actions shall be
devoted to simplifying procedures within
the ‘Conferenza di servizi’ (a formal
agreement amongst two or more public
administrations.
M1C1-53
Investment 1.9:
Provide
technical
assistance and
strengthen
capacity building
for the
implementation
of the Italian
recovery and
resilience plan
Milestone
Entry into force
of primary
legislation to
provide technical
assistance and
strengthen
capacity building
for the
implementation
of the Italian
recovery and
resilience plan
Provision in the
law indicating the
entry into force of
the law
N/A N/A N/A Q2 2021
Measures shall include the provision to
allow for the temporary recruitment of:
i) 2 800 technical figures to strengthen the
public administrations of the South paid by
the national budget;
ii) a pool of 1 000 experts to be deployed
for three years to support administrations
in the management of the new procedures
providing technical assistance.
M1C1-54
Investment 1.9:
Provide
technical
assistance and
strengthen
capacity building
for the
implementation
Target
Completed
recruitment of
experts for the
implementation
of the Italian
recovery and
resilience plan
N/A Number 0 1 000 Q4 2021
Complete the recruitment procedures of
the pool of 1 000 experts to be deployed
for three years to support administrations
in the management of the new procedures
providing technical assistance.
36
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
of the Italian
recovery and
resilience plan
M1C1-55
Reform 1.9:
Reform of the
public
administration
Milestone
Extending the
methodology
applied to the
Italian recovery
and resilience
plan to national
budget to
increase
absorption of
investment
Provision in the
law indicating the
entry into force of
the extension of
the methodology
N/A N/A N/A Q4 2021
Set up a simplified system of milestones
and targets similar to the RRF for the
planning, execution and financing of
projects under the Complementary
Investment Fund (EUR 30,5 billion).
M1C1-56
Reform 1.9:
Reform of the
public
administration
Milestone
Entry into force
of the enabling
legislation for the
reform of public
employment
Provision in the
law indicating the
entry into force of
the law
N/A N/A N/A Q2 2022
The enabling legislation shall include the
following measures:
- define job profiles specific for the public
sector to attract the competences and
skills needed;
- creation of a single recruiting platform to
centralise public hiring procedures for all
central public administrations, with a
commitment to extend the use of the
platform also to local administrations;
- reform of the recruitment process to: i)
move from a purely knowledge-based
system to a system primarily based on
competences and appropriate aptitudes;
37
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
ii) assess competences to be performing
civil servants; iii) differentiate the
recruitment processes between entry-level
recruitment, which shall be purely
competence-based, and the recruitment of
specialised profiles, which should
combine competences with relevant work
experience and would lead to accessing
the career at a higher level. The Ministry
for Public Administration shall ensure the
consistent implementation of the new
process across the administrations;
- reform of the senior civil service to
homogenise appointment procedures
across the public administration, defining
the job profiles and the evaluation of their
performance;
- strengthen the link between life-long
learning and training opportunities for
employees and incentives to participation,
for example by envisaging rewarding
mechanisms or specific career paths, with
a particular attention to the twin
transitions;
- define or update ethics principles of
public administrations through clear rules,
codes of conduct, and training modules on
the topic;
38
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
- strengthen the commitment to gender
balance;
- overhaul the regulatory framework on
vertical mobility, reforming the career
paths to create and access middle
management positions (“quadri”), and
access senior civil positions (“dirigenti di
prima e seconda fascia”) from within the
administration. This includes the reform of
the performance evaluation system, and
the strengthening of the link between
career progression and performance
evaluation;
- overhaul the regulatory framework on
horizontal mobility to achieve an efficient
job market in public administrations
including (a) the creation of a transparent
single advertisement system for all vacant
positions across the central and local
administrations (b) the possibility to apply
for any available position anywhere, (c)
the abolition of the authorisation to
mobility from the administration of origin,
and (d) the introduction of significant
restrictions to the use of alternative means
of mobility not leading to transfers (i.e.
“comandi” and “distacchi”), to make them
exceptional and strictly time-limited.
39
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
M1C1-57
Reform 1.9:
Reform of the
public
administration
Milestone
Entry into force
of administrative
procedures for
the simplification
reform aimed at
implementing
the RRF
Provision in the
law indicating the
entry into force of
the secondary
legislation
N/A N/A N/A Q4 2022
Entry into force of all related delegated
acts, ministerial decrees. secondary
legislation, and all other regulations
necessary for the effective implementation
of the simplification including agreements
with Regions in case of exclusive and
concurrent regional competence.
M1C1-58
Reform 1.9:
Reform of the
public
administration
Milestone
Entry into force
of legal acts for
the reform of
public
employment
Provision
indicating the entry
into force of the
legal acts for the
reform of public
employment
N/A N/A N/A Q2 2023
Entry into force of all related delegated
acts, ministerial decrees, secondary
legislation, and all other regulations
necessary for the effective implementation
of the reform.
M1C1-59
Reform 1.9:
Reform of the
public
administration
Milestone
Entry into force
of strategic
human resource
management in
the Public
Administration
Provision
indicating the entry
into force of the
legislation for the
introduction of
strategic human
resource
management in
the Public
Administration
N/A N/A N/A Q4 2023
The legislation and delegated acts for the
introduction of strategic human resource
management in the Public Administration
shall include: the definition, in the context
of the Integrated Activity and Organisation
Plan (PIAO), of HR strategic plans, for
recruitment, career development and
training, for all central and regional
administrations, supported by an
integrated database with skills and
profiles; creation of a central Delivery Unit
coordinating and supporting the Human
Resource planning system. In a second
phase, HR strategic plans shall be
extended to large municipalities, while
40
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
small and medium municipalities are the
object of specific capacity building
investments.
M1C1-59BIS
Reform 1.9:
Reform of the
public
administration
Milestone
Implementation
of strategic
human resource
management in
the Public
Administration
Publication of the
first semi-annual
report on KPIs.
N/A N/A N/A Q2 2024 The first semi-annual report on KPIs shall
be published.
M1C1-59ter
Reform 1.9:
Reform of the
public
administration
Milestone
Implementation
of strategic
human resource
management in
the Public
Administration
“Toolkit HRM-
Minerva”
operational,
interoperable with
inPA, Syllabus and
with the PIAO
digital platform,
and examination of
the HR strategic
plans.
N/A N/A N/A Q2 2026
“Verifica di conformità” proving (i) that the
“Toolkit HRM-Minerva" is operational and
(ii) is interoperable with the recruitment
platform (inPA), the platform “Syllabus”
and the PIAO digital platform.
An analysis by the Department of Public
Function covering a pilot of at least 200
national and subnational administrations,
shall:(i) examine the content of the HR
strategic plans (Programma Triennale dei
Fabbisogni del Personale) included in the
PIAO,(ii) present the extent to which the
findings of the semi-annual KPI reports
have been taken into account,(iii) mention
follow-up actions recommended by the
DFP.
M1C1-60 Reform 1.9:
Reform of the Target Simplification
and/or N/A Number 0 200 Q4 2024 Simplification and/or digitalisation of
procedures shall concern at least the
41
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
public
administration
digitalization of
200 critical
procedures
affecting citizens
and business
following area:
1) Environment and energy, renewables
and green economy;
2) Construction and urban requalification;
3) Electronic communications
infrastructure;
4) Establishment and operation of
economic activities.
M1C1-62
Reform 1.9:
Reform of the
public
administration
Milestone
Increase
absorption of
investment
Publication of a
report by the
Ministry of finance
N/A N/A N/A Q2 2025 Publication of a report measuring the
absorption of resources of the
Complementary Fund allocated until 2024.
M1C1-63
Reform 1.9:
Reform of the
public
administration
Milestone
Publication of a
repository of
simplified and/or
digitalised
procedures
Publication of the
repository on the
website of the
Department of
Public Function
N/A N/A N/A Q2 2026
The repository of the simplified and/or
digitalised procedures shall be available
on the website managed by the
Department of the Public Function
(www.italiasemplice.gov.it).
Data on Sportello Unico Attività Produttive
(SUAP) and Sportello Unico Edilizia
(SUE) availability throughout the national
territory shall be accessible on the website
www.impresainungiorno.gov.it.
M1C1-66 Investment 1.9:
Provide
technical
Target Attendance
reports on
Syllabus
N/A Number 0 441 750 Q2 2026 At least 441 750 attendance reports on
the Syllabus platform.
42
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
assistance and
strengthen
capacity building
for the
implementation
of the Italian
recovery and
resilience plan
platform
M1C1-68
Reform 1.9:
Reform of the
public
administration
Milestone
Repository
system for Audit
and Controls:
information for
monitoring
implementation
of RRF
Audit report
confirming
repository system
functionalities
N/A N/A N/A Q4 2021
A repository system for monitoring the
implementation of the RRF shall be in
place and operational.
The system shall include, as a minimum,
the following functionalities:
(a) collect data and monitor the
achievement of milestones and targets;
(b) collect, store and ensure access to the
data required by Article 22(2)(d)(i) to (iii) of
the RRF Regulation.
M1C1-69
Reform 1.10:
Reform of the
public
procurement
legislative
framework
Milestone
Entry into force
of the Decree on
simplification of
the public
procurement
system
Provision in the
law indicating the
entry into force of
the law-decree to
simplify the public
procurement
system.
N/A N/A N/A Q2 2021
The Law-decree shall simplify the public
procurement system with at least the
following urgent measures:
i. Sets up targets to reduce the time
between the publication and the contract
award.
ii. Sets up targets and a monitoring
system to reduce the time between the
43
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
contract award and the completion of the
infrastructure (“fase esecutiva”).
iii. Requires that the data of all contracts is
registered in the anti-corruption database
of the national anti-corruption authority
(ANAC).
iv. Implement and incentivize the
alternative dispute resolution mechanisms
in the execution phase of public contracts.
v. Sets up dedicated offices in charge of
public procurement procedures at
Ministries, Regions and Metropolitan
Cities.
Further specifications:
- Simplification and digitalization of the
procedures of central purchasing bodies
(“centrali di committenza”);
- Implement articles 41 and 44 of the
current Public Procurement Code;
- Define how procedures should be
digitalized for all public contracts and
concessions and define interoperability
and interconnectivity requirements;
- Implement article 44 of the current Public
Procurement Code.
44
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
M1C1-70
Reform 1.10:
Reform of the
public
procurement
legislative
framework
Milestone
Entry into force
of the revision of
the Code of
Public
procurement
(D.Lgs. n.
50/2016)
Provision in the
law indicating the
entry into force of
the Law of
Delegation which
reforms the
present Code of
the Public
procurement
system (D.Lgs. n.
50/2016)
N/A N/A N/A Q2 2022
This Law shall establish all the precise
criteria and principles for the systemic
reform of the Public Procurement Code.
The law of delegation shall, at least,
dictate the following principles and criteria
to:
i. Reduce the fragmentation of contracting
authorities (1) establishing the basic
elements of the qualification system, (2)
requiring the setting of an e-platform as a
basic requirement to participate in the
nationwide evaluation of procurement
capacity (3) empowering the national anti-
corruption authority (ANAC) to review the
qualification of contracting authorities in
terms of procurement capacity (types and
volumes of purchases), (4) providing
incentives to use existing professional
central purchasing bodies.
ii. Simplify and digitalize the procedures of
central purchasing bodies (“centrali di
committenza”)
iii. Define how procedures shall be
digitalized for all public contracts and
concessions and define interoperability
and interconnectivity requirements.
iv. Reduce restrictions concerning sub-
45
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
contracting on a progressive basis.
M1C1-71
Reform 1.10:
Reform of the
public
procurement
legislative
framework
Milestone
Entry into force
of all necessary
legislation,
regulations and
implementing
acts (including
secondary
legislation) for
the public
procurement
system
Entry into force of
all necessary
legislation
regulation and
implementing acts
N/A N/A N/A Q4 2021
All necessary legislation, regulations and
implementing acts (including secondary
legislation, if necessary) shall obtain the
following results:
i. The Single Coordination Body for public
procurement policy shall have an
adequate (to be specified in the
Operational Arrangement) level of staffing
and financial resources to be fully
operational, also due to the support given
by a dedicated structure of ANAC.
ii. The Single Coordination Body for public
procurement policy adopts the
professionalization strategy (cf. linked to
Italy’s NRPP proposed reform 2.1.6)
containing the types of training at different
levels, the special tutoring and the
production of operational guidelines, with
support of ANAC and the National School
of Administration.
iii. The dynamic purchasing systems are
made available by Consip and are in line
with Public Procurement Directives.
iv. ANAC completes the exercise of
qualification of contracting authorities in
terms of procurement capacity further to
46
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
the implementation of Article 38 of the
Public Procurement Code.
v. The monitoring system for the time
between the contract award and the
completion of infrastructure works is
operational.
vi. Data of all contracts is registered in the
anti-corruption database of the national
anti-corruption authority (ANAC).
vii. All dedicated offices in charge of public
procurement procedures at Ministries,
Regions and Metropolitan Cities.
M1C1-72
Reform 1.11:
Reduction of late
payments by
public
administrations
and health
authorities
Milestone
Measures to
reduce late
payments from
the public
administration to
businesses are
approved
Provision in the
law indicating the
entry into force of
rules to reduce
late payments
from the PA to
businesses
N/A N/A N/A Q1 2023
Entry into force of new rules to reduce late
payments from the public administration to
businesses.
The measures shall include, at least, the
following key elements:
i. The System InIT shall be deployed in
the central public administration in order
to support economic and financial
accounting and the execution of public
expenditure.
ii. Late payments: the indicators based on
the database of the MoF IT system
(Commercial Credit Platform - PCC) shall
be the weighted average payment time of
47
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
public authorities to businesses and the
weighted average payment delay of public
authorities to businesses for each of the
following levels of public administration:
- central authorities (Amministrazioni dello Stato, enti pubblici nazionali e altri enti)
- regional authorities (Regioni and Province Autonome),
- local authorities (enti locali)
- public health authorities (enti del Servizio sanitario nazionale).
M1C1-72bis
Reform 1.11:
Reduction of late
payments by
public
administrations
and health
authorities
Milestone
Legislative and
specific actions
to reduce late
payments at
central/local
levels
Provision in the
legislation
indicating the entry
into force, circulars
adopted and
measures taken to
reduce late
payments from the
public
administration to
businesses
N/A N/A N/A Q1 2024
The following acts shall enter into force:
- a circular clarifying the scope of
commercial and non-commercial
transactions in line with the Late
Payments Directive;
- a circular clarifying the scope of Article
4(6) of the Late Payments Directive in line
with the latter;
- legislation to ensure that Ordinary
regions and local authorities receive funds
to face their invoices on time from the
central level;
- legislation to require public authorities to
adopt yearly cash-flow plans ensuring the
48
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
respect of the legal payment deadlines;
- legislation introducing provisions to allow
credit assignment to third parties after 30
days of silence/inaction by the public
administrations.
The following actions shall be taken at
central level:
- Entry into force of legislation identifying
the late payers at central level and
requiring the adoption of measures to
ensure that they pay within the 30 days
limits;
- Publication of the stock of arrears of the
Ministries updated quarterly;
- Setting up of task forces where required
by legislation .
The following actions shall be taken at
local level:
- Entry into force of legislation identifying
the late payers at local level and requiring
the adoption of measures to ensure that
they pay within the 30 days limits;
- Publication of the stock of arrears of
these authorities updated quarterly.
49
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
M1C1-72ter
Reform 1.11:
Reduction of late
payments by
public
administrations
and health
authorities
Milestone
Increase human
resources
dealing with
payments
Provision
indicating the entry
into force of
legislation
providing for the
possibility to
increase human
resources dealing
with payments
N/A N/A N/A Q4 2024
Entry into force of legal acts providing for
the possibility to increase human
resources dealing with payments in:
- Ministries identified as late payers that
submitted a plan of interventions in
accordance with Decree-Law No. 19 of
2 March 2024, as converted by Law No.
56 of 29 April 2024;
- municipalities above 60 000 inhabitants,
provinces and metropolitan cities
identified as late payers that submitted a
plan of interventions in accordance with
Decree-Law No. 19 of 2 March 2024, as
converted by Law No. 56 of 29 April 2024.
M1C1-
72quater
Reform 1.11:
Reduction of late
payments by
public
administrations
and health
authorities
Milestone Adoption of the
Audit Plan
Adoption of the
Audit Plan N/A N/A N/A Q4 2024
Adoption of an Audit Plan, including a
roadmap for its implementation, on the
adequacy and timeliness of the existing
payment processes of at least 130 public
administrations identified as late payers
among: (i) central level (including
territorial branches of Ministries); (ii)
municipalities; and (iii) public health
authorities.
M1C1-
72quinquies
Reform 1.11:
Reduction of late
payments by
public
administrations
Milestone
Publication of
information and
data on
payments made
by the public
Publication of
information and
data on payments
made by the public
N/A N/A N/A Q4 2025
The following information shall be
published in a dedicated webpage:
- Explanation of the regulatory framework
on payment times of commercial invoices
50
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
and health
authorities
administration administration of public administrations, including
payment deadlines and remedies
available for creditors in case of delayed
payments;
- Analyses based on the monitoring of the
payment times of the public
administration;
- Data on weighted average payment
time, weighted average payment delay,
ratio between the commercial amount
paid and the commercial amount due,
amount of commercial invoices, and
amount of non-commercial invoices,
updated quarterly, at least for spending
Ministries, Regions/Autonomous
Provinces, Municipalities, and local health
authorities;
- FAQs on payments by the public
administration.
The website of all spending Ministries
shall have a link to the dedicated
webpage.
M1C1-
72sexies
Reform 1.11:
Reduction of late
payments by
public
administrations
Milestone
Final audit
report of the
Audit Plan
Transmission of
the final audit
report of the Audit
Plan to the cabinet
of the Ministry of
N/A N/A N/A Q4 2025
Transmission of the final audit report of
the Audit Plan by the State Accountant
General to the cabinet of the Ministry of
Economy and Finance. The report shall
contain the results of the audit activities
51
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
and health
authorities
Economy and
Finance
carried out by Q4 2025, including the
corrective measures implemented by Q4
2025.
M1C1-73
Reform 1.10:
Reform of the
public
procurement
legislative
framework
Milestone
Entry into force
of the reform of
the Public
Procurement
Code
Provision in the
law indicating the
entry into force of
the Legislative-
Decree to
implement all the
previsions of the
delegation Law on
the Reform of
Public
Procurement Code
N/A N/A N/A Q1 2023
Entry into force of the Legislative-Decree
to implement all the previsions of the
delegation Law to reform the Public
Procurement Code.
M1C1-74
Reform 1.10:
Reform of the
public
procurement
legislative
framework
Milestone
Entry into force
of all necessary
implementing
measures and
secondary
legislation for the
reform on
simplification of
the public
procurement
code
Entry into force of
all necessary
implementing
measures and
secondary
legislation
N/A N/A N/A Q2 2023
Entry into force of all necessary
implementing measures and secondary
legislation for the reform/simplification of
the public procurement system (also
stemming from the revision of the Public
Procurement Code).
M1C1-73bis Reform 1.10:
Reform of the
public
Milestone Adoption of a
circular providing
guidance on the
Adoption of a
circular providing
guidance on the
N/A N/A N/A Q2 2024 Adoption, having consulted ANAC, of a
circular providing guidance on the current
applicable rules on qualification and
52
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
procurement
legislative
framework
qualification
system for
contracting
authorities
qualification
system for
contracting
authorities
centralization, to explain that qualification
and/or the use of central purchasing
bodies also for below thresholds awards
are possible and advisable
M1C1-73ter
Reform 1.10:
Reform of the
public
procurement
legislative
framework
Milestone
Incentives to
qualification and
professionalisati
on of contracting
authorities.
Analysis by the
Cabina di Regia,
publication of
results of the
participation in
training activities
and self-
assessment
exercises and
adoption of
initiatives and tools
N/A N/A N/A Q4 2024
Analysis by the Cabina di Regia (pursuant
to Art. 221 of the Public Procurement
Code), having consulted ANAC, of the
effects of the application of the Public
Procurement Code on:
- the number of qualified contracting authorities and centralised purchasing bodies;
- the number and value of the public contracts managed by qualified contracting auhorities on their own behalf and on behalf of non-qualified entities;
- the qualification exercise to improve the decision-making speed for the award of public contracts.
Publication of the results of the mapping
of the participation by non-qualified
entities to training activities and of self-
assessment exercises.
Initiatives aimed at improving the
qualification of contracting authorities, the
reduction in fragmentation and the
professionalisation of non-qualified
53
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
entities, shall be adopted.
Instruments for technical/administrative
support to contracting authorities shall be
provided.
M1C1-
73quater
Reform 1.10:
Reform of the
public
procurement
legislative
framework
Milestone
Entry into force
of guidelines on
below-EU
threshold
procurement
Entry into force of
guidelines on
below-EU
threshold
procurement
N/A N/A N/A Q4 2023
Circular on below-EU threshold
procurement adopted and published on
the Italian Official Journal. The circular
shall clarify that contracting authorities
can use open and restricted procedures
for below-EU threshold procurement.
M1C1-
73quinquies
Reform 1.10:
Reform of the
public
procurement
legislative
framework
Milestone
Entry into force
of new legal
provisions on
project financing
Provision in the
law indicating the
entry into force of
new legal
provisions
N/A N/A N/A Q4 2024
Entry into force of new legal provisions on
project financing aimed at enhancing
efficiency and competition, in particular to
increase contestability of concessions.
M1C1-75
Reform 1.10:
Reform of the
public
procurement
legislative
framework
Milestone
Full operation of
the National
eProcurement
System
Availability of the
functions defined
in the feasibility
study (to be
elaborated as
project Task 1)
N/A N/A N/A Q4 2023
The National eProcurement System shall
be operational and fully in line with EU
Public Procurement Directives and include
the full digitalization of procedures up to
the contract execution (smart
procurement), shall be interoperable with
the management systems of the public
administration, shall contain a digital
habilitation of PO, auction sessions,
machine learning to detect trends, CRMs
with chatbots, digital engagement and
54
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
status chain.
M1C1-75bis
Investment 1.10:
Support to
Qualification and
eProcurement
Milestone
Support to
Qualification and
eProcurement
Entry into service
of the procurement
support function
N/A N/A N/A Q4 2024
A procurement support function shall be
set up within the framework of the Public
Buyers Professionalization Strategy. The
procurement support function shall be
dedicated to contracting authorities to fulfil
the requirements of Annex II.4 of the
Public Procurement Code and to support
them in the eProcurement process,
backing up the acquisition of digital skills
and providing technical support in the
adoption of the digitalization of public
procurement, including the use of dynamic
purchasing systems.
M1C1-76
Reform 1.11:
Reduction of late
payments by
public
administrations
and health
authorities
Target
Average number
of days for the
central public
authorities to
pay businesses
is reduced
N/A
Weighted
average
payment time
(in days)
N/A 30 Q1 2025
Based on data from the Commercial Credit Platform (“Piattaforma Crediti Commerciali”) related to invoices issued in 2024, the following indicators for payments from central public authorities (Amministrazioni centrali) to businesses shall be:
- for the weighted average payment time (“tempo medio di pagamento ponderato”): at most 30 days;
- for the weighted average payment delay (“tempo medio di ritardo ponderato”): at most 0 days.
55
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
Furthermore, the difference between the unweighted average payment time (“tempo medio di pagamento semplice”) and the weighted average payment time shall not exceed 20 days, unless the unweighted average payment time is below 30 days.
M1C1-77
Reform 1.11:
Reduction of late
payments by
public
administrations
and health
authorities
Target
Average number
of days for the
regional public
authorities to
pay businesses
is reduced
N/A
Weighted
average
payment time
(in days)
N/A 30 Q1 2025
Based on data from the Commercial Credit Platform (“Piattaforma Crediti Commerciali”) related to invoices issued in 2024, the following indicators for payments from regional public authorities (Regioni - Province Autonome) to businesses shall be: - for the weighted average payment
payment time (“tempo medio di pagamento ponderato”): at most 30 days;
- for the weighted average payment delay (“tempo medio di ritardo ponderato”): at most 0 days.
Furthermore, the difference between the
unweighted average payment time
(“tempo medio di pagamento semplice”)
and the weighted average payment time
shall not exceed 20 days, unless the
unweighted average payment time is
below 30 days.
56
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
M1C1-78
Reform 1.11:
Reduction of late
payments by
public
administrations
and health
authorities
Target
Average number
of days for the
local public
authorities to
pay businesses
is reduced
N/A
Weighted
average
payment time
(in days)
N/A 30 Q1 2025
Based on data from the Commercial
Credit Platform (“Piattaforma Crediti
Commerciali”) related to invoices issued in
2024, the following indicators for
payments from local public authorities
(enti locali) to businesses shall be:
- For the weighted average payment time (“tempo medio di pagamento ponderato”): at most 30 days;
- for the weighted average payment delay (“tempo medio di ritardo ponderato”): at most 0 days.
Furthermore, the difference between the
unweighted average payment time
(“tempo medio di pagamento semplice”)
and the weighted average payment time
shall not exceed 20 days, unless the
unweighted average payment time is
below 30 days.
M1C1-79
Reform 1.11:
Reduction of late
payments by
public
administrations
and health
authorities
Target
Average number
of days for public
health
authorities to
pay businesses
is reduced
N/A
Weighted
average
payment time
(in days)
N/A 60 Q1 2025
Based on data from the Commercial
Credit Platform (“Piattaforma Crediti
Commerciali”) related to invoices issued in
2024, the following indicators for
payments from public health authorities
(enti del Servizio sanitario nazionale) to
businesses shall be:
- for the weighted average payment time
57
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
(“tempo medio di pagamento ponderato”):
at most 60 days;
- for the weighted average payment delay
(“tempo medio di ritardo ponderato”): at
most 0 days;
Furthermore, the difference between the
unweighted average payment time
(“tempo medio di pagamento semplice”)
and the weighted average payment time
shall not exceed 30 days, unless the
unweighted average payment time is
below 60 days.
M1C1-84
Reform 1.10:
Reform of the
public
procurement
legislative
framework
Target
Average time
between the
publication and
the contract
award
N/A Number 139 100 Q4 2023
Based on the methods adopted by the EU
Official Journal (TED database), using
data from IT National database for public
contracts (BDNCP), managed by ANAC,
the average time between the deadline for
the submission of tenders and the
contract award shall be reduced to less
than 100 days for contracts above the
thresholds of the EU public procurement
directives.
M1C1-84bis
Reform 1.10:
Reform of the
public
procurement
Milestone
Measures to
improve decision
speed in
contract award
Adoption of
measures related
to decision speed
N/A N/A N/A Q4 2024 The Cabina di regia, pursuant to article.
221 of the Code of Public Contracts,
having consulted ANAC, shall adopt:
58
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
legislative
framework
of contracting
authorities -an analysis evaluating the impact of the
eProcurement on the timeline for contract
award, from the deadline for the
submission of tenders to the signature of
the contract;
-a report on the 2024 data for the TED
indicator “Decision speed”; “Decision
speed” means the time between the
deadline for the submission of tenders
and the date of signature of the contract;
- a report on contracting authorities’ best
practices aimed at shortening contract
award timeline and on the initiatives to
reduce the decision speed time.
Qualified contracting authorities whose
average decision-making speed is greater
than 160 days in TED shall be required to
implement corrective actions.
M1C1-85
Reform 1.10:
Reform of the
public
procurement
legislative
framework
Target
Average time
between the
contract award
and the
realization of the
infrastructure
N/A Percentage 100 90 Q2 2024
The average time between the award of
the contract and the realization of the
infrastructure (‘executive phase’) shall be
reduced by at least 10% on the basis of a
comparison between (i) the works
awarded between 1 January and
31 December 2019, and concluded by
59
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
30 June 2021, and (ii) the works awarded
between 1 July 2021 and 30 June 2022,
and concluded by 31 December 2023.
M1C1-86
Reform 1.10:
Reform of the
public
procurement
legislative
framework
Target
Civil servants
trained through
the Public
Buyers
Professionalizati
on Strategy
N/A Number 0 20 000 Q4 2023 At least 20 000 civil servants have been
trained through the Public Buyers
Professionalization Strategy.
M1C1-87
Reform 1.10:
Reform of the
public
procurement
legislative
framework
Target
Contracting
authorities using
dynamic
purchasing
systems
N/A Percentage 0 15 Q4 2023
At least 15% of contracting authorities are
using dynamic purchasing systems as per
EU Directive 2014/24 (two years
observation timeframe and taking into
account that in Italy the use of the DPS is
mainly targeted at above the threshold
purchases, given that the below-the-
threshold ones are mainly performed
using eMarketplaces). The target refers to
Central Government Contracting
Authorities (250 PA as registered per 30
April 2021 to the National e-Procurement
System managed by Consip on behalf of
the MEF).
M1C1-88
Reform 1.11:
Reduction of late
payments by
public
administrations
Target
Average number
of days for the
central public
authorities to
pay businesses
N/A
Weighted
average
payment time
(in days)
N/A 30 Q1 2026
Based on data from the Commercial
Credit Platform (“Piattaforma Crediti
Commerciali”) related to invoices issued in
2025, the following indicators for
payments from central public authorities
60
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
and health
authorities
is reduced (Amministrazioni centrali) to businesses
shall be:
- for the weighted average payment time
(“tempo medio di pagamento ponderato”):
at most 30 days;
- for the weighted average payment delay
(“tempo medio di ritardo ponderato”): at
most 0 days;
Furthermore, the difference between the
unweighted average payment time
(“tempo medio di pagamento semplice”):
and the weighted average payment time
shall not exceed 15 days, unless the
unweighted average payment time is
below 30 days.
M1C1-89
Reform 1.11:
Reduction of late
payments by
public
administrations
and health
authorities
Target
Average number
of days for the
regional public
authorities to
pay businesses
is reduced
N/A
Weighted
average
payment time
(in days)
N/A 30 Q1 2026
Based on the data from the Commercial
Credit Platform (”Piattaforma Crediti
Commerciali”) related to invoices issued in
2025, the following indicators for
payments from regional public authorities
(Regioni - Province Autonome) to
businesses shall be:
- for the weighted average payment time (“tempo medio di pagamento ponderato”): at most 30 days;
- for the weighted average payment
61
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
delay (“tempo medio di ritardo ponderato”): at most 0 days.
Furthermore, the difference between the
unweighted average payment time
(“tempo medio di pagamento semplice”)
and the weighted average payment time
shall not exceed 15 days, unless the
unweighted average payment time is
below 30 days.
M1C1-90
Reform 1.11:
Reduction of late
payments by
public
administrations
and health
authorities
Target
Average number
of days for the
local public
authorities to
pay businesses
is reduced
N/A
Weighted
average
payment time
(in days)
N/A 30 Q1 2026
Based on the data from the Commercial
Credit Platform (”Piattaforma Crediti
Commerciali”) related to invoices issued in
2025, the following indicators for
payments from local public authorities
(enti locali) to businesses shall be:
- for the weighted average payment time (“tempo medio di pagamento ponderato”): at most 30 days;
- for the weighted average payment delay (“tempo medio di ritardo ponderato”): at most 0 days.
Furthermore, the difference between the
unweighted average payment time
(“tempo medio di pagamento semplice”)
and the weighted average payment time
shall not exceed 15 days, unless the
unweighted average payment time is
62
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
below 30 days.
M1C1-91
Reform 1.11:
Reduction of late
payments by
public
administrations
and health
authorities
Target
Average number
of days for public
health
authorities to
pay businesses
is reduced
N/A
Weighted
average
payment time
(jn days)
N/A 60 Q1 2026
Based on the data from the Commercial
Credit Platform (“Piattaforma Crediti
Commerciali”) related to invoices issued in
2025, the following indicators for
payments from public health authorities
(enti del Servizio sanitario nazionale) to
businesses shall be:
- for the weighted average payment time
(“tempo medio di pagamento ponderato”):
at most 60 days;
- for the weighted average payment delay
(“tempo medio di ritardo ponderato”): at
most 0 days;
Furthermore, the difference between the
unweighted average payment time
(“tempo medio di pagamento semplice”)
and the weighted average payment time
shall not exceed 20 days, unless the
unweighted average payment time is
below 60 days.
M1C1-96
Reform 1.10:
Reform of the
public
procurement
Target
Average time
between the
time limit for
receipt of
N/A Percentage 100 80 Q4 2025
Based on the data extracted from the
ANAC’s Banca Dati Nazionale Contratti
Pubblici, as IT national eSender, the
average time between the time limit for
63
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
legislative
framework
tenders and the
date of signature
of the contract
receipt of tenders and the date of
signature of the contract over a 12-month
period taking as reference the date of
signature of the contract starting not
earlier than 1st September 2024, shall be
reduced of at least 20 per cent compared
to 2018 decision speed indicator as
published on the EU single market
scoreboard for contracts above the
threshold of the EU public procurement
directives.
M1C1-97ter
Reform 1.10:
Reform of the
public
procurement
legislative
framework
Milestone
Measures
related to
execution speed
Adoption of
measures related
to execution speed
N/A N/A N/A Q4 2025
a) Publication on Agenzia per l’Italia Digitale (AGID)’s website of new technical rules enabling the collection of information for the digital monitoring of the execution of public contracts.
b) Signature of a memorandum of understanding between the Ministry of the Economy and Finance and Autorità Nazionale Anticorruzione (ANAC) introducing technical rules on the interoperability of data relating to public finances and public works payments with the ANAC’s database (Banca Dati Nazionale dei Contratti Pubblici).
c) Entry into force of legal acts allowing contracting authorities to foresee and
64
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
use the savings resulting from awards below the base price to finance bonuses for early completion of the works.
d) Publication on Ministry of Infrastructures and Transport (MIT)’s website of guidelines, adopted by MIT having consulted ANAC, on early- completion bonuses clauses and on templated content of cooperation agreements pursuant to article 82bis of Legislative Decree 36/2023 (Public Procurement Code), to reduce works’ completion time.
e) Publication on MIT’s website of guidelines to support contracting authorities in the use of the Building Information Modeling (BIM) for public works.
M1C1-98
Reform 1.10:
Reform of the
public
procurement
legislative
framework
Target
Civil servants
trained through
the Public
Buyers
Professionalizati
on Strategy
N/A Number 20 000 40 000 Q4 2024 At least 40 000 civil servants have been
trained through the Public Buyers
Professionalization Strategy.
M1C1-98bis Reform 1.10:
Reform of the
public
Target Civil servants
trained through
the Public
N/A Number 40 000 60 000 Q2 2025 At least 60 000 civil servants have been
trained through the Public Buyers
Professionalization Strategy. The total
65
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
procurement
legislative
framework
Buyers
Professionalizati
on Strategy
number may include civil servants who
have already been trained in previous
years and whose training has been
reported for the M1C1-86 and M1C1-98
targets, only if they have obtained a
higher-level, specialized or advanced
training
M1C1-99
Reform 1.10:
Reform of the
public
procurement
legislative
framework
Target
Contracting
authorities using
dynamic
purchasing
systems
Percentage of
Central
Government
Contracting
Authorities using
dynamic
purchasing
systems as per EU
Directive 2014/24
Percentage 15 20 Q2 2024
At least 20% of contracting authorities are
using dynamic purchasing systems as per
Directive 2014/24 (observation timeframe
starting from 1 January 2022). The Central
Government Contracting Authorities are
250 Public Administrations (as registered
per 30 April 2021 to the National e-
Procurement System managed by Consip
on behalf of the MEF).
M1C1-100
Reform 1.13:
Reform of the
spending review
framework
Milestone
Entry into force
of legislative
provisions
improving the
effectiveness of
the spending
review -
Reinforcement
of Finance
Ministry
Provision in the
law indicating the
entry into force of
the law
N/A N/A N/A Q4 2021
The revised framework for spending
reviews in central state administrations
(Ministries) shall improve its effectiveness
by reinforcing the role of the Ministry of
Economy and Finance. In particular, it
shall provide for a reinforced role of the
Ministry of Economy and Finance in the
ex-ante evaluation, monitoring processes
and ex-post evaluation, allowing to
enforce the thoroughly execution of the
reviews and the achievement of the
intended goals.
66
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
M1C1-101
Reform 1.12:
Reform of the
tax
administration
Milestone
Adoption of a
review of
possible actions
to reduce tax
evasion
Publication of the
review N/A N/A N/A Q4 2021
Adopt a report to inform government
actions for reducing tax evasion from
omitted invoicing, especially in the sectors
most exposed to tax evasion, including
through targeted incentives to consumers.
M1C1-102
Reform 1.13:
Reform of the
spending review
framework
Milestone
Adoption of a
report on the
effectiveness of
practices used
by selected
public
administrations
for formulating
and
implementing
saving plans
Publication of the
report N/A N/A N/A Q4 2022
The report shall be prepared by the
Accounting Department of the Finance
Ministry in cooperation with selected
administrations to:
- Assess their practices in the formulation and implementation of saving plans.
- Define guidelines for all public administrations.
M1C1-103
Reform 1.12:
Reform of the
tax
administration
Milestone
Entry into force
of primary and
secondary
legislation and
regulatory
provisions and
completion of
administrative
processes for
encouraging tax
compliance and
improving audits
Provisions in the
law and regulatory
provisions
indicating the entry
into force
N/A N/A N/A Q2 2022
The provisions shall include:
i) full operationalisation of the database
and the dedicated IT infrastructure for the
release of pre-populated VAT tax return,
as provided for by art. 4, paragraph 1, of
the legislative decree n. 127/2015.
(ii) the database used for the “compliance
letters” (providing early communications to
taxpayers for which anomalies are
detected) is enhanced with a view of
reducing the incidence of false-positive
67
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
and controls and increasing the number of
communications sent out to taxpayers.
(iii) entry into force of reformed legislation
in order to ensure effective administrative
sanctions in case of refusal of private
providers to accept electronic payments
(original article 23 of decree-law
124/2019, which had been abrogated
upon conversion into law, represents a
reference).
(iv) Completion of the process of data
pseudonymization provided for by art. 1,
paragraphs 681-686, of the law
n.160/2019 and set up of digital
infrastructure for the analysis of big data
generated through the interoperability of
databases fully pseudonymized, with a
view to increase the effectiveness of the
risk analysis underlying the selection
process.
(v) Entry into force of primary and
secondary legislation implementing
additional effective actions based on the
findings of the review of possible
measures to reduce tax evasion from
omitted invoicing.
M1C1-104 Reform 1.13:
Reform of the Milestone Adoption of
savings targets
Quantitative
savings target for N/A N/A N/A Q2 2022 On the basis of the decree-laws 90 and 93
of 2016 and law 163/2016, set targets in
68
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
spending review
framework
for spending
reviews for the
years 2023-2025
the aggregate
central state
administrations
defined in the
Document of
Economy and
Finance - in euro
the Economic Financial Document for
yearly spending reviews for the aggregate
central state administrations for the years
2023, 2024, 2025. The saving targets
shall reflect an adequate level of ambition.
M1C1-105
Reform 1.12:
Reform of the
tax
administration
Target
Higher number
of "compliance
letters"
N/A Number 2 150 908 2 581 090 Q4 2022
The number of “compliance letters”,
providing early communication to
taxpayers for which anomalies are
detected, shall be increased by at least
20% compared to 2019.
M1C1-106
Reform 1.12:
Reform of the
tax
administration
Target
Reducing the
number of false
positive
"compliance
letters”
N/A Number 126 500 132 825 Q4 2022
The number of false-positive “compliance
letters” (providing an early communication
to taxpayers for which anomalies are
detected, but for which no frauds are
detected ex post) shall be reduced by at
least 5% with respect to 2019.
M1C1-107
Reform 1.12:
Reform of the
tax
administration
Target
Increase in the
tax revenue
generated by
"compliance
letters"
N/A Euro 2 130 000 000 2 449 500 000 Q4 2022 Tax revenue generated by “compliance
letters” shall increase by 15% with respect
to 2019.
M1C1-108
Reform 1.15:
Reform of public
accounting rules
Milestone
Approval of the
Conceptual
framework, the
Set of accrual
Resolution of the
Accounting
Department of the
Finance Ministry
N/A N/A N/A Q2 2024
Completion of a conceptual framework as
reference for the accrual accounting
system according to the qualitative
features defined by Eurostat (EPSAS
69
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
accounting
standards and
the
Multidimensional
Chart of
Accounts
approving the
Accrual
Accounting
Governance
Structure
Working Group);
Setting of accrual accounting standards
based on IPSAS;
Design a multidimensional and multi-level
chart of accounts.
M1C1-109
Reform 1.12:
Reform of the
tax
administration
Target
Sending first
pre-populated
VAT tax returns
N/A Number 0 2 300 000 Q2 2023 At least 2 300 000 taxpayers shall receive
pre-populated VAT tax returns for the tax
year 2022.
M1C1-110
Reform 1.13:
Reform of the
spending review
framework
Milestone
Re-classification
of the general
State budget,
with reference to
the
environmental
expenditure and
to the
expenditure that
promotes gender
equality
Inclusion of the re-
classification of the
general State
budget with
reference to the
environmental
expenditure and to
the expenditure
that promotes
gender equality in
the 2024 Budget
Law
N/A N/A N/A Q4 2023
The 2024 Budget Law shall provide the
Parliament with a Sustainable
Development Budget consisting in the
classification of the general State budget
with reference to the environmental
expenditure and to the expenditure that
promotes gender equality. The
classification shall be consistent with the
criteria underlying the definition of
Sustainable Development Goals and the
targets of the Agenda 2030.
M1C1-111
Reform 1.13:
Reform of the
spending review
framework
Milestone
Completion of
the yearly
spending review
for 2023, with
reference to the
Adoption of the
Finance Ministry
report on the
spending review in
2023, certifying the
N/A N/A N/A Q2 2024
The Finance Ministry report to be
transmitted to the Council of Ministers as
provided for by decree-laws 90 and 93 of
2016 and law 163/2016 shall:
70
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
saving target set
in 2022 for 2023
completion of the
process and the
achievement of the
target.
-certify the completion of the spending
review process for 2023 in respect of the
provision for the spending review
framework.
-certify the achievement of the target set
in 2022.
M1C1-112
Reform 1.12:
Reform of the
tax
administration
Target
Improve the
operational
capacity of the
tax
administration in
line with the
hiring objectives
of the
“Performance
plan 2021-2023”
of the Revenue
Agency
N/A Number of
hirings 0 4 113 Q2 2024
4 113 new staff units shall be hired by the
Revenue Agency in line with the hiring
objectives of the “Performance plan 2021-
2023”.
M1C1-113
Reform 1.12:
Reform of the
tax
administration
Target
Higher number
of "compliance
letters"
N/A Number 2 150 908 3 011 271 Q4 2023
The number of “compliance letters”,
providing early communication to
taxpayers for which anomalies are
detected, shall be increased by at least
40% compared to 2019.
M1C1-114
Reform 1.12:
Reform of the
tax
administration
Target
Increase in the
tax revenue
generated by
"compliance
N/A Euro 2 130 000 000 2 769 000 000 Q4 2023 Tax revenue generated by “compliance
letters” shall increase by 30% with respect
to 2019.
71
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
letters"
M1C1-115
Reform 1.13:
Reform of the
spending review
framework
Milestone
Completion of
the yearly
spending review
for 2024, with
reference to the
saving target set
in 2022 and
2023 for 2024
Adoption of the
Finance Ministry
report on the
spending review in
2024, certifying the
completion of the
process and the
achievement of the
target.
N/A N/A N/A Q2 2025
The Finance Ministry report to be
transmitted to the Council of Ministers as
provided for by decree-laws 90 and 93 of
2016 and law 163/2016 shall:
- certify the completion of the spending
review process for 2024 in respect of the
provision for the spending review
framework.
- certify the achievement of the target set
in 2022 and 2023.
M1C1-116
Reform 1.12:
Reform of the
tax
administration
Target
Reduction of tax
evasion as
defined by the
indicator
"propensity to
evade"
N/A Percentage 0 -10 Q4 2025
The updated government report on the
shadow economy published in 2025
pursuant to art. 2 of the legislative decree
n. 160/2015 shall certify a 10% reduction
on average in 2022-2023 in the
“Propensity to evade” in all taxes
excluding property taxes (“Imposta
Municipale Unica”) and excises compared
to 2019.
M1C1-117
Reform 1.15:
Reform of public
accounting rules
Target
Representatives
of public entities
trained on the
new accrual
accounting
system
N/A Percentage 0 90 Q1 2026
Based on data from the central digital
platform for trainings on the new
accounting system, the basic training on
the new accrual accounting system shall
be completed by representatives of public
sector entities covering at least 90% of
primary expenditure of the whole public
72
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
sector (net of State-owned companies).
M1C1-118
Reform 1.15:
Reform of public
accounting rules
Milestone
Issuance of
financial
statements and
entry into force
of the legislative
act on the
accrual
accounting
reform for public
sector entities
covering at least
90% of the
primary
expenditure of
the whole public
sector, net of
State-owned
companies.
Provision in the
legislative act
indicating the entry
into force of the
legislative act.
N/A N/A N/A Q2 2026
As a pilot phase for the legislative act of
public accounting rules, public
administration financial statements for
public sector entities covering at least
90% of the primary expenditure of the
whole public sector, net of State-owned
companies, shall be prepared.
Furthermore, a legislative act shall enter
into force and contain provisions
mandating the adoption of the new
accrual accounting system by 2030
(financial year) by public sector entities
covering at least 90% of the primary
expenditure of the whole public sector, net
of State-owned companies. The legislative act shall also require the
organisation of training programmes for
the transition to the new accrual
accounting system.
Additionally, guidelines for the application
of each accounting standard shall be
published on the website of the Ministry of
Economy and Finance.
M1C1-119
Reform 1.14:
Reform of the
subnational
Milestone Definition of the
parameters for
the regional
Entry into force of
primary legislation N/A N/A N/A Q2 2026
Entry into force of primary legislation that
shall define the essential levels of
services (“livelli essenziali delle
73
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
fiscal framework fiscal federalism prestazioni”) for the fiscal federalism for
regions with ordinary status in at least two
policy areas, pursuant to legislative
decree n. 68 of 6 May 2011.
M1C1-120
Reform 1.14:
Reform of the
subnational
fiscal framework
Milestone
Entry into force
of the legal acts
defining the
fiscal federalism
for provinces
and metropolitan
cities.
Entry into force of
the legal acts
defining the fiscal
federalism for
provinces and
metropolitan cities.
N/A N/A N/A Q2 2026
Entry into force of legal acts defining the
fiscal federalism for provinces and
metropolitan cities.
M1C1-121
bis
Reform 1.12:
Reform of the
tax
administration
Milestone
Entry into force
of legal act(s) for
improving tax
collection
Provisions in legal
act(s) indicating
the entry into force
N/A N/A N/A Q2 2026
Entry into force of legal act(s) providing
that:
1. Data from electronic invoicing shall be
made available to the Agency responsible
for collecting unpaid tax liability (“Agenzia
Entrate Riscossione”);
2. Tax offsettings shall be only allowed in
case unpaid tax liabilities do not exceed
EUR 50 000.
3. The Revenue Agency shall be allowed
to send communications to taxpayers in
case electronic invoices were issued but
no VAT declaration were presented for the
same period.
74
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
M1C1-122
Reform 1.13:
Reform of the
spending review
framework
Milestone
Completion of
the yearly
spending review
for 2025, with
reference to the
saving target set
in 2022, 2023
and 2024 for
2025.
Transmission to
the Council of
Ministers of the
Finance Ministry
report on the
spending review in
2025
N/A N/A N/A Q2 2026
The Finance Ministry report to be
transmitted to the Council of Ministers as
provided for by decree-laws 90 and 93 of
2016 and law 163/2016 shall:
- certify the conclusion of the spending
review process for 2025 in respect of the
provision for the spending review
framework.
- certify the achievement of the target set
in 2022, 2023 and 2024.
M1C1-144
Investment 1.4.2
- Citizen
inclusion -
Accessibility
improvement of
digital public
services
Target
Increased
accessibility of
digital public
services/interven
tions
implemented
N/A Number 0 55 Q4 2025
Final reports confirming that at least 55
public administrations have implemented
actions envisaged under legal agreements
between each of them and Agenzia per
l’Italia Digitale (AgID) to i) reduce the
types of errors identified on at least 2
digital services, and ii) provide assistive
technologies to PA workers with
disabilities.
M1C1-147
Investment 1.2 -
Cloud
enablement for
local PA
Target
Cloud
enablement for
local Public
Administration
T2
N/A Number 4 083 12 464 Q2 2026
The migration of 12 464 Local Public
Administrations towards certified cloud
environments shall be considered
achieved when the testing of all the
systems, datasets and applications’
migration included in each migration plan
are successful.
75
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
M1C1-148
Investment 1.4.1
- Citizen
experience -
Improvement of
the quality and
the usability of
digital public
services
Target
Increase in the
quality and the
usability of
digital public
services T2
N/A Percentage 40 80 Q2 2026
Administrations (municipalities, primary
and secondary of 1st and 2nd grade
educational institutions) shall adhere to a
common model and design system for
websites and digital services, simplifying
user interaction and easing maintenance.
Municipalities contributing to the target
shall adhere to the common model and
design system for at least 3.5 services on
average.
M1C1-149
Investment 1.4.3
- Adoption scale
up of PagoPA
platform services
and the “IO” app
Target
Adoption scale
up of PagoPA
platform services
T2
N/A Number 11 450 14 100 Q2 2026
At least 14 100 public administrations
shall be present on the PagoPA platform,
offering a number of services: on average
35 services for municipalities, 15 for
Regions, 15 for health authorities and 8
for schools and universities.
M1C1-151
Investment 1.4.5
- Digitization of
public notices
Target
Adoption of the
Digital
Notification
Platform T2
N/A Number 800 6 400 Q2 2026
At least 6 400 public administrations shall
use the Digital Notification Platform (DNP)
to send legally binding digital notices to
addressees.
M1C1-150
Investment 1.4.3
- Adoption scale
up of PagoPA
platform services
and the “IO” app
Target Adoption scale
up of “IO” app T2 N/A Number 7 000 14 100 Q2 2026
At least 14 100 public administrations
shall be present on the “IO" app, offering a
number of services: on average 35
services for municipalities, 15 for regions,
15 for health authorities and 8 for schools
and universities.
76
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
M1C1-152
Investment 1.6.1
- Digitization of
the Ministry of
the Interior
Target
Ministry of
Interior - re-
engineered or
digitized
processes or
services T2
N/A Number 7 45 Q2 2026 Processes or services of the Ministry of
the Interior are re-engineered or digitized.
M1C1-153
Investment 1.6.2
- Digitization of
the Ministry of
Justice
Target Digitized judicial
files T2 N/A Number 3 500 000 7 750 000 Q4 2025
Digitalization of 7 750 000 judicial files
pertaining to the last 20 years (01/01/2006
- 30/06/2026) related to completed or
ongoing trials of judicial courts.
M1C1-154
Investment 1.6.2
- Digitization of
the Ministry of
Justice
Target
Justice Data
Lake knowledge
systems T2
N/A Number 0 6 Q2 2026
Implementation of six new Data Lake
knowledge systems:
1) Anonymization system of civil and criminal sentences
2) Integrated management system 3) Management and analysis system for
civil trials 4) Management and analysis system for
criminal trials 5) Advanced statistics system on civil
and criminal trials 6) Automated system for identification
of victim-offender relationship.
M1C1-155
Investment 1.6.3
- Digitization of
National Social
Security Institute
(INPS) and
Target
INAIL - Re-
engineered/
digitized
processes/servic
es T2
N/A Number 53 82 Q2 2026 82 INAIL processes or services are re-
engineered/digitized.
77
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
National Institute
for Insurance
against
Accidents at
work (INAIL)
78
A.3. Description of the reforms and investments for the loan
Investment 1.1 - Digital infrastructure
The objective of this investment is to ensure that the systems, datasets and applications of the public
administration are hosted in data centres with high quality standards for security, performance, scalability,
European interoperability and energy efficiency. The investment consists in the migration of the datasets and
applications of the public administration towards the PSN or towards secure certified public cloud providers.
Investment 1.2 - Cloud enablement for local PA
The objective of this investment is to migrate the datasets and applications of a substantial part of the local
public administration to a secure cloud infrastructure, allowing each administration the freedom to choose
within a set of certified public cloud environments.
The measure also envisages a “migration as a service” support package to administrations encompassing: (i)
the initial assessment, (ii) the procedural/administrative support needed to launch the effort, (iii) the
negotiation of the necessary external support and (iv) the overall project management over the course of
execution. A team supervised by the Ministry for Technological Innovation and Digital Transition (MITD) is
expected to identify and certify a broad list of qualified providers and to negotiate a set of standard support
packages tailored to the size of the administration and the services involved in the migration.
Investment 1.4 - Digital services and citizen experience
The objective of this investment is to develop an integrated and citizen-oriented ecosystem of digital public
services, ensure their widespread adoption across central and local administrations and enhance overall user
experience.
The measure:
(vii) defines reusable service delivery models ensuring full accessibility requirements (Investment 1.4.1 -
Citizen experience - Improvement of the quality and the usability of digital public services);
(viii) increases the accessibility of digital public services (Investment 1.4.2 - Citizen inclusion: Accessibility
improvement of digital public services);
(ix) entails the adoption of the digital application for payments between citizens and public administrations
(PagoPa) and the adoption of the “IO” app (Investment 1.4.3 - Adoption scale up of PagoPA platform
services and the “IO” app);
(x) fosters the adoption of National Digital Identity platforms (Sistema Pubblico di Identità Digitale, SPID
and Carta d’Identità Elettronica, CIE) and of the national registry (Anagrafe nazionale della
popolazione residente, ANPR) (Investment 1.4.4 - Adoption scale up of the National Digital Identity
platforms (SPID, CIE) and the national registry (ANPR));
(xi) sets up a single platform for notifications (Investment 1.4.5 - Digitization of public notices);
(xii) entails the adoption of Mobility as a Service (MaaS) (Investment 1.4.6 - Mobility as a Service for
Italy, with this last measure being financed on the basis of non-repayable financial support).
Investment 1.6 - Digital transformation of large central administrations
The objective of this investment is to increase the efficiency and simplify the procedures of the main central
administrations – including (i) the National Social Security Institute (INPS) and National Institute for
Insurance against Accidents at work (INAIL), (ii) the Judicial system, (iii) the Ministry of Defence, (iv) the
Ministry of Interior, (v) the Finance Police. The investment consists of the re-engineering and the digitisation
of a set of priority processes, activities, and services within their remit.
79
A.4. Milestones, targets, indicators, and timetable for monitoring and implementation for the loan Sequential
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
M1C1-14
Investment 1.6.5:
Digitization of the
Council of State
Target
Council of State - Court
documents available for
analysis in data
warehouse T1
N/A Number 0 800 000 Q4 2023
Number of court documents
related to administrative
jurisdiction system (such as
sentences, opinions and
decrees) for which metadata is
fully available in data
warehouse.
M1C1-16
Investment 1.6.5:
Digitization of the
Council of State
Target
Council of State - Court
documents available for
analysis in data
warehouse T2
N/A Number 800 000 2 500 000 Q4 2023
Number of court documents
related to administrative
jurisdiction system (such as
judgments, opinions and
decrees) for which metadata is
fully available in data
warehouse.
M1C1-123
Investment 1.6.3 -
Digitization of National
Social Security Institute
(INPS) and National
Institute for Insurance
against Accidents at
work (INAIL)
Target
INPS - "One click by
design" services/contents
T1
N/A Number 0 35 Q4 2022
35 additional services deployed
on INPS' institutional web site
(www.inps.it)
The services shall be accessible
on the institutional site through
appropriate profiling logics (the
system will suggest services of
possible interest based on age,
work characteristics, perceived
80
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
benefits, and user history).
The 35 services are related to
the following INPS institutional
areas:
•Pensions benefits
•Social Shock Absorbers
•Unemployment benefits
•Disability benefits
•Redemptions
•Company collection of
contribution
•Agriculture workers services
•Anti-fraud, corruption and
transparency services
In the listed institutional areas,
the services that shall be
implemented will concern the
digital submission of requests for
services, the check of the
requirements for the benefit, the
status monitoring of the practice
by users, the proactive proposal
of services based on user's
needs, the automatic renewal of
benefits without the need for new
81
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
applications.
Finally, there shall be monitoring
dashboards that allow both the
monitoring by INPS of the
benefits provided and data
driven support to policy makers’
decisions.
M1C1-124
Investment 1.6.3 -
Digitization of National
Social Security Institute
(INPS) and National
Institute for Insurance
against Accidents at
work (INAIL)
Target
INPS - Employees with
improved Information and
Communication
Technologies (ICT) skills
T1
N/A Number 0 4 250 Q4 2022
At least 4 250 INPS employees
assessed with regards to their
Information and with certified
improved skills in the following
areas of the European e-
Competence Framework:
(i) Plan; (ii) Build; (iii) Run
(iv) Enable; (v) Manage.
The areas for improvement of
competences will be identified
according to the target group of
learners.
M1C1-125 Investment 1.2 - Cloud
enablement for local PA Milestone
Award of (all) public calls
for Cloud enablement for
local Public Administration
tenders
Notification of the
award of (all) public
contracts for Cloud
enablement for local
Public Administration
tenders
N/A N/A N/A Q1 2023
Notification of the award of (all)
public calls for each type of
Public Administration involved
(Municipalities, Schools, local
healthcare agencies) to collect
and assess migration plans. The
82
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
issuance of three dedicated calls
shall allow the Ministry for
Technological Innovation and
Digital Transition to assess the
very specific needs of each type
of Public Administration involved.
Tenders awarded (i.e. publication
of the list of public
administrations admitted to
receive funding) related to three
public calls for proposal
respectively for Municipalities,
Schools, and local healthcare
agencies, to collect and assess
migration plans, in compliance
with the ’Do no significant harm’
Technical Guidance
(2021/C58/01) through the use
of an exclusion list and the
requirement of compliance with
the relevant EU and national
environmental legislation.
M1C1-126
Investment 1.4.3 -
Adoption scale up of
PagoPA platform
services and the “IO”
Target
Adoption scale up of
PagoPA platform services
T1
N/A Number 9 000 11 450 Q4 2023
Ensure an increase in the
number of services integrated in
the platform for:
- public administrations already
83
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
app in the baseline (9 000 entities)
- new public administrations
joining the platform (2 450 new
entities).
In both cases, the total number
of services of the public
administrations joining the
platform shall have to increase
by at least 20% compared to the
2021 services baseline
(31.03.2021). The number of
services that shall be integrated
depend on the type of
administration (the final 2026
goal is to have an average of 35
services for Municipalities, 15
services for Regions, 15 services
for health authorities, 8 services
for schools and universities).
M1C1-127
Investment 1.4.3 -
Adoption scale up of
PagoPA platform
services and the “IO”
app
Target Adoption scale up of “IO”
app T1 N/A Number 2 700 7 000 Q4 2023
Ensure an increase in the
number of services integrated in
“IO “app for:
- public administrations already
in the baseline (2 700 entities)
- new public administrations
84
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
joining the platform (4 300 new
entities).
In both cases, the total number
of services of the public
administrations joining the
platform shall have to increase
by at least 20% compared to the
2021 services baseline
(31.03.2021). The number of
services that shall be integrated
depend on the type of
administration (the final 2026
goal is to have an average of 35
services for Municipalities, 15
services for Regions, 15 services
for health authorities, 8 services
for schools and universities).
M1C1-128
Investment 1.4.5 -
Digitization of public
notices
Target Adoption scale up of
digital public notices T1 N/A Number 0 800 Q4 2023
At least 800 Central Public
Administrations and
Municipalities, with respect to
Digital Notification Platform
(DNP), shall provide digital
legally-binding notices to
citizens, legal entities,
associations and any other
public or private entities.
85
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
M1C1-129
Investment 1.6.1 -
Digitization of the
Ministry of the Interior
Target
Ministry of the Interior -
Fully re-engineered and
digitized processes T1
N/A Number 0 7 Q4 2023
Internal procedures and
processes fully re-engineered (7
processes in total until
31 December 2023) and that can
be entirely completed online
(such as office automation,
mobility services and e-learning).
M1C1-130
Investment 1.6.2 -
Digitization of the
Ministry of Justice
Target Digitized judicial files T1 N/A Number 0 3 500 000 Q4 2023
Digitalization of 3 500 000
judicial files pertaining to the last
20 years (01/01/2006 -
30/06/2026) related to completed
or ongoing trials of judicial
courts.
M1C1-131
Investment 1.6.2 -
Digitization of the
Ministry of Justice
Milestone Justice Data Lake
knowledge systems T1
Report testifying the
start of execution of
the contract
N/A N/A N/A Q4 2023
Start of execution of the contract
for the realization of six new
Data Lake knowledge systems:
1) Anonymization system of civil and criminal sentences
2) Integrated management system
3) Management and analysis system for civil trials
4) Management and analysis system for criminal trials
5) Advanced statistics system on civil and criminal trials
86
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
6) Automated system for identification of victim-guilty relationship.
The execution of every public
contract starts by a specific
administrative act of the
responsible of the procedure,
named “starting execution”.
M1C1-132
Investment 1.6.3 -
Digitization of National
Social Security Institute
(INPS) and National
Institute for Insurance
against Accidents at
work (INAIL)
Target
INPS - “One click by
design” services/contents
T2
N/A Number 35 70 Q4 2023
35 additional services deployed
on Inps's institutional web site
(www.inps.it)
The services shall be accessible
on the institutional site through
appropriate profiling logics (the
system shall suggest services of
possible interest based on age,
work characteristics, perceived
benefits, and user history).
The 35 services are related to
the following INPS institutional
areas:
•Pensions benefits
•Social Shock Absorbers
87
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
•Unemployment benefits
•Disability benefits
•Redemptions
•Company collection of
contribution
•Agriculture workers services
•Anti-fraud, corruption and
transparency services
In the listed institutional areas,
the services that shall be
implemented shall concern the
digital submission of request of
services, the check of the
requirements for the benefit, the
status monitoring of the practice
by users, the proactive proposal
of services based on user's
needs, the automatic renewal of
benefits without the need for new
applications.
Finally, there shall be monitoring
dashboards that allow both the
monitoring by INPS of the
88
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
benefits provided and data
driven support to policy makers’
decisions.
M1C1-133
Investment 1.6.3 -
Digitization of National
Social Security Institute
(INPS) and National
Institute for Insurance
against Accidents at
work (INAIL)
Target
INPS - Employees with
improved Information and
Communication
Technologies (ICT) skills
T2
N/A Number 4 250 8 500 Q4 2023
Additional 4 250 INPS
employees assessed with
certified improved skills in the
following areas of the European
e-Competence Framework:
(i) Plan; (ii) Build; (iii) Run
(iv) Enable; (v) Manage.
The areas for improvement of
competences shall be identified
according to the target group of
learners.
M1C1-134
Investment 1.6.3 -
Digitization of National
Social Security Institute
(INPS) and National
Institute for Insurance
against Accidents at
Target
INAIL - Fully re-
engineered and digitized
processes/services T1
N/A Number 29 53 Q4 2023
The target is to achieve 53
(52%) re-engineered institutional
processes and services in order
to make them fully digitized.
The involved areas of INAIL are:
Insurance, Social and Health
services, Prevention and safety
89
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
work (INAIL) work, Certifications and
verifications.
In particular, the expected target
for each area is expressed
above:
• Insurance: 8 (25%);
• Social and health services: 18 (50%);
• Prevention and safety work: 9 (80%);
• Certifications and verifications: 18 (80%).
M1C1-135
Investment 1.6.4 -
Digitization of the
Ministry of Defence
Target
Ministry of Defence -
Digitalisation of
procedures T1
N/A Number 4 15 Q4 2023
Digitization, revision, and
automation of 15 procedures
related to management of
Defence’s personnel (such as
recruiting, employment and
retirement, employees' health)
starting from a baseline of four
already digitized procedures.
M1C1-136
Investment 1.6.4 -
Digitization of the
Ministry of Defence
Target
Ministry of Defence -
Digitalisation of certificates
T1
N/A
Number of
digitized
certificates
190 000 450 000 Q4 2023
Number of digitized identity
certificates (450 000) issued by
the Ministry of Defence and
running onto the infrastructure
complemented by a disaster
recovery site starting from a
90
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
baseline of 190 000 already
digitized certificates.
M1C1-137
Investment 1.6.4 -
Digitization of the
Ministry of Defence
Milestone
Ministry of Defence -
Commissioning of
institutional web portals
and intranet portals
Institutional web
portals and intranet
web portals fully
operational
N/A N/A N/A Q4 2023
Development and
implementation of (i) institutional
web portals and (ii) intranet
portals for specific needs of
internal communication.
M1C1-138
Investment 1.6.4 -
Digitization of the
Ministry of Defence
Target
Ministry of Defence -
Migration of non-mission
critical applications into
Solution for Complete
Information Protection by
Infrastructure Openness
(S.C.I.P.I.O.) T1
N/A Number 0 10 Q4 2023
Initial migration and operational
availability of non-mission critical
applications to new open-source
infrastructure. This encompasses
hardware environment
implementation, installation of
middleware open-source
components, and the re-
engineering of applications.
M1C1-139 Investment 1.2 - Cloud
enablement for local PA Target
Cloud enablement for local
Public Administration T1 N/A Number 0 4 083 Q3 2024
The migration of 4 083 Local
Public Administrations towards
certified cloud environments
shall be considered achieved
when the testing of all the
systems, datasets and
applications’ migration included
in each migration plan are
successful.
91
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
M1C1-140
Investment 1.4.1 -
Citizen experience -
Improvement of the
quality and the usability
of digital public services
Target
Improvement of the quality
and the usability of digital
public services T1
N/A Percentage 0 40 Q4 2024
Administrations (municipalities,
primary and secondary of 1st
and 2nd grade educational
institutions and specific piloted
health care and cultural heritage
entities) adhering to a common
model and design system,
simplifying user interaction and
easing maintenance for the
years to come.
Adherence to the common
design/model of
websites/services components
shall consist of:
(1) Evaluation of projects
submitted;
(2) Assessment of project
completion on key usability
metrics (digital usability scores),
through dedicated platform
already available.
M1C1-141
Investment 1.6.4 -
Digitization of the
Ministry of Defence
Target
Digitalisation of
procedures of the Ministry
of Defence T2
N/A Number 15 20 Q4 2024
Digitization, revision, and
automation of 20 procedures
related to management of
Defence’s personnel (such as
92
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
recruiting, employment and
retirement, employees' health),
starting from a baseline of fifteen
already digitized procedures with
target 1.
M1C1-142
Investment 1.6.4 -
Digitization of the
Ministry of Defence
Target
Digitalisation of certificates
of the Ministry of Defence
T2
N/A
Number of
digitized
certificates
450 000 750 000 Q4 2024
Number of digitized identity
certificates (750 000) issued by
the Ministry of Defence and
running onto the infrastructure
complemented by a disaster
recovery site, starting from a
baseline of 450 000 already
digitized certificates with
target 1.
M1C1-143
Investment 1.6.4 -
Digitization of the
Ministry of Defence
Target
Ministry of Defence -
Migration of mission
critical and non-mission
critical applications into
Solution for Complete
Information Protection by
Infrastructure Openness
(S.C.I.P.I.O.) T2
N/A Number 10 15 Q4 2024
Final migration of four mission
critical and eleven non-mission
critical applications to new open-
source infrastructure
encompassing hardware
environment implementation,
installation of middleware open
source components, re-
engineering of applications,
starting from a baseline of ten
already migrated with target 1.
93
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
M1C1-145
Investment 1.4.4 -
Adoption scale up of the
National Digital Identity
platforms (SPID, CIE)
and the national registry
(ANPR)
Target
National Digital Identity
platform (CIE) and the
national registry (ANPR)
N/A Number 9 700 000 42 300 000 Q4 2025
42 300 000 individuals with valid
digital identities are registered on
the national digital identity
platform (CIE).
M1C1-146
Investment 1.4.4 -
Adoption scale up of the
National Digital Identity
platforms (SPID, CIE)
and the national registry
(ANPR)
Target National Digital Identity
platforms (SPID) N/A Number 0 10 217 Q2 2025
10 217 entities adopted the
electronic identification (eID) via
the Public Digital Identity System
(SPID) after 3 December 2021.
M1C1-26 Investment 1.1: Digital
infrastructure Target
Migration to the Polo
Strategico Nazionale or to
a secure, certified public
cloud environment
N/A Number 100 280 Q2 2026
At least 280 Central Public
Administrations and Local
Healthcare Authorities (Aziende
Sanitarie Locali/Aziende
Ospedaliere) migrated to “Polo
Strategico Nazionale” (PSN) or
to a secure, certified public cloud
environment according to the
migration plan as approved by
the Department for Digital
Transformation.
The migration can be executed
in different ways according to the
94
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
state of art of on-premises
software’s IT architecture owned
by each migrating public
administration.
These strategies can vary from
pure hosting and lift-and-shift
migrations for not-cloud-ready
software to a migration to
Infrastructure-as-a-Service
(IaaS), Platform-as-a-Service
(PaaS) or Software-as-a-Service
(SaaS) for cloud-ready software.
At least 40% of the migrated
services shall be implemented
through either IaaS, PaaS or
SaaS solutions.
95
B. MISSION 1 COMPONENT 2:
Axis 1 - Digitalization, Innovation and Competitiveness of the Production System
Axis 1 of Mission 1 Component 2 of the Italian recovery and resilience plan concerns investments and
reforms mainly aimed at (i) supporting the digital transition and the innovation of the production
system through incentives to investments in technologies, research, development and innovation; (ii)
deploying ultra-fast broadband and 5G networks to reduce the digital divide as well as satellite
constellations and services; (iii) promoting the development of strategic value chains and supporting
the competitiveness of companies, with a focus on SMEs.
Measures under this component aim to address gaps emerging from the Digital Economy and Society
Index (DESI) 2020 as regards the digital transformation of businesses and the shortcomings in
connectivity, with a view to strengthen the social and economic resilience of the country.
The investments and reforms under this component shall contribute to addressing the Country-
Specific Recommendations addressed to Italy in 2020 and 2019 on the need to “strengthen distance
learning and skills, including digital ones” (Country-Specific Recommendation 2, 2020), to “promote
private investment to foster the economic recovery” (Country-Specific Recommendation 3, 2020), to
“focus investment on the green and digital transition, in particular on […] reinforced digital
infrastructure to ensure the provision of essential services” (Country-Specific Recommendation 3,
2020), to “foster upskilling, including by strengthening digital skills (Country-Specific
Recommendation 2, 2019), to “focus investment-related economic policy on research and innovation,
and the quality of infrastructure, considering also regional disparities” (Country-Specific
Recommendation 3, 2019) and, to some extent, to “support non-bank access to finance for innovative
and smaller firms” (Country-Specific Recommendation 5, 2019).
It is expected that no measure in this component does significant harm to environmental objectives
within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description of
the measures and the mitigating steps set out in the recovery and resilience plan in accordance with
the ‘Do no significant harm’ Technical Guidance (2021/C58/01).
Axis 2 – Improving business environment and competition
The main objective of the axis 2 of Mission 1 Component 2 is to improve the business environment to
facilitate entrepreneurship, and the framework conditions for competition to favour a more efficient
allocation of resources and productivity gains. The main tool to reach these goals is the Annual
Competition Law, to be adopted each year.
The investments and reforms under this component shall contribute to addressing the Country-
Specific Recommendations addressed to Italy in 2019 on the need to “address restrictions to
competition […], also through a new annual competition law” (Country-Specific Recommendation 3,
2019).
B.1. Description of the reforms and investments for non-repayable financial support
Axis 1 - Digitalization, Innovation and Competitiveness of the Production System
Investment 1: Transition 4.0
The objective of the measure is to support the digital transformation of businesses by incentivising
private investment in assets and activities supporting digitalisation. The measure consists of a tax
credit scheme.
Reform 1: Reform of the Industrial Property System
96
The main objective of the reform is to adapt the industrial property system to modern challenges and
ensure that the innovation potential contributes to the country’s recovery and resilience. Specifically,
it aims to pursue the following objectives: enhancing the industrial property protection system;
encouraging industrial property use and dissemination, especially by SMEs; facilitating access to and
sharing of intangible assets, while ensuring a fair return on investments; guaranteeing a more rigorous
respect for industrial property; and strengthening Italy's role in European and international fora on
industrial property.
The measure concerns the reform of the Italian industrial property code, covering at least the
following areas: (i) review the regulatory framework to strengthen the protection of industrial
property rights and simplify procedures, (ii) strengthen the support to companies and research
institutions, (iii) enhance skills and competences development, (iv) facilitate knowledge transfer, and
(v) strengthen innovative services promotion.
Investment 6: Investment in the Industrial Property System
The objective of the investment is to support the industrial property system and accompany its reform,
as envisaged under Reform 1 of this component. The measure includes financial support for industrial
property-related projects of companies and research bodies, for the following: patent-related measures
(Brevetti+), Proof of Concept (POC) programs and the strengthening of technology transfer offices
(TTOs).
Axis 2 – Improving business environment and competition
Reform 2: Annual Competition Laws for 2022, 2023, 2024 and 2025
The Competition Law shall be adopted each year, increasing competitive procedures to award public
service contracts for local public services (including water, waste and local public transport), avoiding
the unjustified prolongation of concessions to incumbent operators in many sectors, including ports,
highways, hydropower and regional transport, providing for the proper regulation of public services
contracts revising the rules on aggregation and applying the general principle of proportionality in the
length and proper compensation of public service contracts. The Competition Laws shall support
competition and the improvement of the efficiency of the management and of quality of services in
regional transport, as well as increase incentives for Regions to tender their public services contracts
for regional rail services.
The annual Competition Laws shall include pro-competitive sector-specific measures in several areas
including energy (electricity, gas and water), waste management, transport (ports, rail and highways)
and health, which shall complement the investments and reforms under Missions 2, 3 and 6. Flanking
measures to ensure the uptake of competition in electricity retail markets shall enter into force at the
latest on 31st December 2022. The Annual Competition Law 2022 shall notably adopt the Electricity
Network Development Plan and promote the installation of 2nd generation smart electricity meters,
which shall increase by at least 17 million units throughout Italy by 31st December 2025. Pro-
competitive measures shall also be introduced for electric charging stations.
Moreover, the Laws shall contribute to the improvement of the business environment at least through:
(i) the alignment of merger control rules with EU law, (ii) the consolidation, digitalisation and
professionalisation of market surveillance authorities;(iii) a reform to simplify and facilitate the set up
of start-ups and venture capital activites, as well as to promote a national strategy for technology
transfer (iv) the reduction of the time of accreditation for providing information about employees
from seven to four days to reduce the number of days to set up a business.
Reform 3: Framework for the simplification and streamlining of firms’ incentives
97
The reform aims to set up a framework for the review, simplification, and streamlining of the system
of national incentives for firms, thereby paving the ground for Italy’s commitment in its medium-term
fiscal-structural plan to rationalise and simplify firm incentives. The reform consists in the entry into
force of legal acts as well as in the activation of additional functionalities for (a) the RNA (National
registry of State aids) and (b) the incentivi.gov.it Platform. The rationalisation of incentives is a
further step that is not linked to the milestones and targets in the Council Implementing Decision.
98
B.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
M1C2-1 Investment 1:
Transition 4.0 Milestone
Entry into force of
legal acts to make
Transition 4.0 tax
credits available
to potential
beneficiaries and
establishment of
the Scientific
Committee
Provision in the law
indicating the entry
into force of the
budgetary law
enabling the tax
credits and provision
in the related
implementing acts
indicating their entry
into force
N/A N/A N/A Q4 2021
The legal acts shall make
Transition 4.0 tax credits available
to potential beneficiaries. These are
tax credits for (i) 4.0 (that is to say,
technologically advanced) tangible
capital goods, (ii) 4.0 intangible
capital goods, (iii) standard
intangible capital goods, (iv)
research, development and
innovation activities, and (v)
training activities.
The tax credit codes shall be
defined by a resolution of the
Revenues Agency to allow
beneficiaries to use the tax credits
with the F24 payment model. A
Scientific Committee including
experts from the Ministry Economy
and finance, the Ministry of
Economic Development and the
Bank of Italy shall be established
through the adoption of a
ministerial decree to assess the
economic impact of Transition 4.0
tax credits.
99
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
M1C2-2 Investment 1:
Transition 4.0 Target
Transition 4.0 tax
credits granted to
firms based on tax
returns presented
in 2021-2022
N/A Number 0 69 900 Q2 2024
At least 69 900 Transition 4.0 tax
credits have been granted to firms
in relation to 4.0 tangible capital
goods, 4.0 intangible capital goods,
standard intangible capital goods,
research, development and
innovation activities, or training
activities. A tax credit shall be
considered granted with the
presentation of a tax return. Tax
returns shall be presented between
1 January 2021 and
31 December 2022. For firms
whose tax year does not
correspond to the calendar year,
the end of the relevant period for
the presentation of the tax returns
related to all the above-listed tax
credits shall be extended from
31 December 2022 to
30 November 2023.
M1C2-3 Investment 1:
Transition 4.0 Target
Transition 4.0 tax
credits granted to
firms based on tax
returns presented
in 2021-2023
N/A Number 69 900 111 700 Q2 2025
At least 111 700 Transition 4.0 tax
credits have been granted to firms
in relation to 4.0 tangible capital
goods, 4.0 intangible capital goods,
standard intangible capital goods,
research, development and
innovation activities, or training
activities. A tax credit shall be
100
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
considered granted with the
presentation of a tax return. Tax
returns shall be presented between
1 January 2021 and
31 December 2023. For firms
whose tax year does not
correspond to the calendar year,
the end of the considered period for
the presentation of the tax returns
related to all the above-listed tax
credits shall be extended from 31
December 2023 to
30 November 2024.
The baseline refers to the number
of Transition 4.0 tax credits that
have been granted to firms, based
on tax returns presented between
1 January 2021 and 31
December 2022 for 4.0 tangible
capital goods, 4.0 intangible capital
goods, and standard intangible
goods and based on tax returns
presented between 1 January and
31 December 2022 for research,
development and innovation
activities, and training activities. For
firms whose tax year does not
correspond to the calendar year,
also tax returns presented up to
101
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
30 November 2023 shall be
included in the baseline for all the
above-listed tax credits.
No firms operating in sectors of
activity identified by ATECO codes
05, 06, 07 and 09 shall be
considered for the target. In
addition, concerning investments in
4.0 tangible capital goods as well
as in development and innovation
activities, no firms operating in
sectors of activity identified by
ATECO codes 30. 22, 29, 38, 41,
42, 43, 17, 01, 50, 19, 20, 51, 24,
49, 23 and 35 shall be considered
for the target.
M1C2-4
Reform 1:
Reform of the
Industrial
Property
System
Milestone
Entry into force of
a Legislative
Decree aimed at
reforming the
Italian industrial
property code and
the relevant
implementing acts
Provision in the law
indicating the entry
into force of the new
Industrial property
code and provision in
the related
implementing acts
indicating their entry
into force
N/A N/A N/A Q3 2023
The new Legislative Decree shall
amend the Italian industrial
property code (Legislative Decree
n. 30 of 10 February 2005) and
cover the following areas as a
minimum: (i) review of the
regulatory framework to strengthen
the protection of industrial property
rights and simplify procedures, (ii)
strengthen the support to
companies and research
institutions, (iii) enhance skills and
102
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
competences development, (iv)
facilitate knowledge transfer, (v)
strengthen innovative services
promotion.
M1C2-5
Investment 6:
Investment in
the Industrial
Property
System
Target
Final
activities/project
reports for at least
254 projects
related to
Industrial Property
and research.
N/A Number 0 254 Q4 2025
Final activities/project reports
signed by the beneficiary entities
have been provided for at least 254
projects.
M1C2-6
Reform 2:
Annual
Competition
Laws
Milestone
Entry into force of
the Annual
Competition Law
2021
Provision indicating
the entry into force of
the Annual
Competition Law
2021.
N/A N/A N/A Q4 2022
The Annual Competition Law shall
include, at least, the following key
elements, whose implementing
measures and secondary
legislation (if necessary) shall be
adopted and enter into force no
later than 31 December 2022.
It shall concern: - Antitrust enforcement - Local public services - Energy - Transport - Waste - Starting a business - Market surveillance
103
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
Antitrust enforcement:
i. Remove additional hurdles to
merger-control by further aligning
the Italian merger-control rules with
EU law.
Local public services:
ii. Strengthen and make more
widespread use of the principle of
competition for local public services
contracts, in particular in waste and
local public transport.
iii. Limit direct awards by requiring
local public authorities to justify any
deviation from the tendering of
public service contracts (as per
Article 192 of the Public
Procurement Code).
iv. Provide for the proper regulation
of public service contracts by
implementing article 19 of Law
124/2015 as a single text on local
public services, in particular in
waste management.
v. Rules and aggregation
mechanisms incentivize
municipalities’ unions in order to
reduce the number of entities and
104
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
contracting authorities by linking
them to the optimal territorial
aggregations (“ambiti territoriali
ottimali”) and the areas and
adequate levels of local and
regional public transport services
(“bacini e livelli adeguati di servizi
di trasporto pubblico locale e
regionale”) of at least 350 000
inhabitants.
The legal act on local public
services that implements Article 19
of Law 124/2015 shall at least:
- define public services based on
EU law criteria;
- provides for general principles of
provision, regulation and
management of local public
services;
- establish a general principle of
proportionality in the length of
public service contracts;
- clearly separate the functions of
regulation and control and the
management of public service
contracts;
- ensure that local public authorities
105
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
justify their increase in shares of
participated companies for in-
house awards;
- provide for proper compensation
of public service contracts, based
on costing overseen by an
independent regulators (e.g.
ARERA for energy or ART for
transport);
- limit the average duration of in-
house contracts and reduce and
harmonize across tendering entities
the standard length of tendered
contracts, provided that the
duration ensures the economic and
financial equilibrium of the
contracts, also based on the criteria
set forth by the Transports
Authority.
Energy:
vi. Make the tendering of
concessions contracts mandatory
for hydropower and define the
regulatory framework for
hydropower concessions.
vii. Make the tendering of
concessions contracts mandatory
106
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
for gas distribution.
viii. Establish transparent and non-
discriminatory requirements for the
assignment of public spaces for
electric charging or for the selection
charging point/station operators.
ix. Remove regulated tariffs for
electricity supply for electric vehicle
charging.
The competition framework for
hydropower concessions shall at
least:
- Require that important
hydropower facilities should be
regulated by general and uniform
criteria at central level.
- Require Regions to define the
economic criteria that underpin the
duration of concession contracts.
-Phase out the possibility to extend
contracts (as already ruled by the
Italian Constitutional Court).
- Require Regions to harmonise the
access criteria to the tendering
criteria (to create a predictable
business environment).
107
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
Transport:
x. Establish clear, non-
discriminatory and transparent
criteria for the award for port
concessions.
xi. Remove barriers for port
concessionaires to merge port
concession activities in several big
and medium-sized ports.
xii. Remove barriers that prevent
concessionaires from providing
some of the port services
themselves and using their own
equipment, without prejudice to the
safety of workers, provided that the
relevant conditions required to
protect safety of workers are
necessary and proportionate to the
objective of ensuring safety in the
port areas.
xiii. Simplify the revision of the
procedures for the revision of the
ports’ authorization plans.
xiv. Implement article 27 comma 2
d) of Decree-Law 50/2017, which
provides incentives for regions to
tender out their regional railway
108
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
contracts.
Waste:
xv. Simplify authorization
procedures for waste treatment
facilities.
Starting a business:
xvi. Reduce the time of
accreditation for providing
information about employees, from
seven to four days to reduce the
number of days to set up a
business.
Market surveillance:
xvii. Consolidation of national
market surveillance authorities in
not more than ten agencies located
in the main regions of Italy, each of
them covering all product groups
and reporting to the single liaison
officer set up according to
Regulation 2019/1020 (“Goods
Package”).
xviii. Require national market
surveillance authorities to conduct
digitalized product inspections and
data collection, to apply artificial
109
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
intelligence to trace dangerous and
illicit products and to identify trends
and risks in the single market.
xix. Require national market
surveillance authorities to include
training and the use of the
Information and Communication
System for the pan-European
market surveillance.
xx. Establish new accredited
laboratories for product testing for
all product groups. These
laboratories shall conduct testing of
e-commerce, physical laboratory
testing, joint actions
(customs/market surveillance
authorities; two or more national
market surveillance authorities,
national and EU market
authorities).
M1C2-7
Reform 2:
Annual
Competition
Laws
Milestone
Entry into force of
all energy-related
implementing
measures and
secondary
legislation (if
necessary)
Entry into force of all
energy-related
implementing
measures and
secondary legislation
(if necessary)
N/A N/A N/A Q4 2022
Entry into force of all energy-
related implementing measures
and secondary legislation (if
necessary) to:
i. Phase out regulated prices for
micro-enterprises and households
as from 1 January 2023.
110
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
ii. Adopt flanking measures to
support the uptake of competition
in electricity retail markets.
The flanking measures to ensure
the uptake of competition in
electricity retail markets shall
provide at least the following:
- Auction the customer base to
level the playing field for new
entrants.
- Fix a ceiling as a maximum
market share available to each
supplier;
- Allow Italian consumers to ask
their energy supplier to disclose
their billing data to a third-party
providers;
- Increase transparency on the
electricity bill by giving consumers
access to the sub-components of
the “spesi per oneri di sistema”;
- Remove the requirement for
suppliers to collect charges
unrelated to the energy sector.
M1C2-8 Reform 2:
Annual Milestone Entry into force of
all implementing
Entry into force of all
secondary legislation, N/A N/A N/A Q4 2022 Entry into force of all implementing
measures (included secondary
111
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
Competition
Laws
measures
(included
secondary
legislation, if
necessary) for the
effective
implementation
and application of
the measures
stemming from
the 2021 Annual
Competition Law
including all
necessary regulations
for measures
stemming from the
2021 Annual
Competition Law
legislation, if necessary) for the
effective implementation and
application of the measures
stemming from the 2021 Annual
Competition Law.
M1C2-9
Reform 2:
Annual
Competition
Laws
Milestone
Entry into force of
the Annual
Competition Law
2022
Provision indicating
the entry into force of
the Annual
Competition Law
2022.
N/A N/A N/A Q4 2023
Entry into force of the 2022 Annual
Competition Law The Annual competition law shall
include, at least, the following key
elements, whose implementing
measures and secondary
legislation (if necessary) shall be
adopted and enter into force no
later than 31 December 2023.
It shall:
i) Establish a clear procedure for
the adoption, within predetermined
deadlines and in any event by 31
December of the relevant period
(every two years)(*), of the
Electricity Network Development
112
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
Plan for the next decade which
ensures completion of the
procedure and simplifying the
approval process.
(*) The 2021 Electricity Network
Development Plan shall be adopted
by 31 December 2023.
ii) promote the deployment of 2nd
generation smart electricity meters;
Antitrust:
iii) increase the duration for the
assessment by the Italian
Competition Authority (Autorità
Garante della Concorrenza e del
Mercato) of concentrations that
may significantly impede effective
competition pursuant to Article 6 of
Law 287/1990, from 45 days to 90
days.
Retail:
iv) simplification of authorization
procedures for promotional sales
by undertakings holding outlets in
different municipalities.
Pharmaceuticals:
113
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
v) ensure proportionality of
authorization requirements for the
sale of galenic pharmaceuticals.
M1C2-10
Reform 2:
Annual
Competition
Laws
Milestone
Entry into force of
all implementing
measures
(included
secondary
legislation, if
necessary) for the
effective
implementation
and application of
the measures
stemming from
the 2022 Annual
Competition Law
Entry into force of all
secondary legislation,
including all
necessary regulations
for measures
stemming from the
2022 Annual
Competition Law
N/A N/A N/A Q4 2023
Entry into force of all secondary
legislation (if necessary), including
all necessary regulations for the
effective implementation and
application of all the
aforementioned measures
stemming from the 2022 Annual
Competition Law.
M1C2-11
Reform 2:
Annual
Competition
Laws
Milestone
Entry into force of
the Annual
Competition Law
2023
Provision indicating
the entry into force of
the Annual
Competition Law
2023.
N/A N/A N/A Q4 2024
Entry into force of the 2023 Annual
Competition Law. The Annual
competition Law shall include, at
least, the following key elements,
whose implementing measures and
secondary legislation (if necessary)
shall be adopted and enter into
force no later than 31 December
2024.
It shall include at least the following
114
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
measures:
Highways:
i) on access to concessions and
termination of contract, the Annual
Competition Law shall at least:
- make the tendering of
concessions contracts
mandatory for highways,
without prejudice for in house
providing within the limits
established by the EU law(*);
- improve the efficiency of
decisional administrative
procedures related to the
concession contracts;
- require a detailed and
transparent description of the
subject matter of the
concession contract
-require concession authorities
to designate concessions for
highway sections, assigned by
public procedure, taking into
account the estimates of scale
efficiency and the cost of
highway concessionaires
developed by the regulatory
115
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
authority (Autorità di
Regolazione dei Trasporti -
ART);
- reinforce controls by the
Ministry of Infrastructure on
the costs and execution of
highways infrastructures;
- prevent the automatic
renewal of concession
contracts, improve the
technical and administrative
procedures related to the
periodical updating of
economic and financial plans
and the annual implementation
of these plans, and prohibit the
use of the procedures
regulated by article 193 of the
Public Procurement Code as a
means of awarding expired or
expiring highway concession
contracts;
- simplify/clarify the regulation
of the contract termination and
cancellation conditions, also
with a view to preserve an
adequate level of the service;
- for the termination of the
116
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
contract in the public interest,
the law shall at least provide
for an adequate compensation
to enable the concessionaire
to recoup investments that
have not been fully amortised.
ii) on charging regulatory model,
the Annual Competition Law shall
at least:
- ensure timely and full
implementation of ART’s
charging regulatory model,
based on a price cap
methodology, taking into
account the periodical updates
of the multi-annual economic
and financial planning of the
concessionaires (as approved
by the competent regulator),
and the annual roll-out of
these plans.
iii) on users’ rights, the Annual
Competition Law shall:
- ensure full and timely
implementation of ART’s
117
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
regulatory framework related
to safeguard of users’ rights
and provision of adequate
service levels.
iv) on outsourcing of construction
works, the Annual Competition Law
shall at least:
- According to Article 186(2) of
Legislative Decree no.
36/2023, establish the
obligation for highway
concessionaires to entrust
third parties, by public
evidence procedures, between
50% and 60% of contracts for
works, services and supplies.
The shares shall be calculated
according to the amounts of
the economic and financial
plans annexed to the
concession documents.
(*) as far as in-house entrustments,
the law shall:
- require a mandatory ex ante
verification of the legality of in-
house entrustment and forbid
the launch of the tender
procedure or the in-house
118
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
entrustments without this
verification;
- entrust the Authority for the
Regulation of Transport (ART)
with adequate instruments and
powers to perform the above
mentioned verifications, and
the (legal) support of the
National Anti-Corruption
Authority (ANAC);
- require that the installation of
electric charging points and
the implementation of
adequate parking and rest
areas for operators of freight
transport are carried out in full
compliance with the regulatory
framework devised by ART.
Insurance:
v) Entry into force of the necessary
acts to enable the portability of data
for car black boxes between
insurers;
Starting a business:
vi) Review and update of
legislation concerning innovative
start-ups and venture capital (e.g.
119
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
Start Up Act 2012) in order to
rationalise existing legislation,
review the definition of start-ups
and promote investment in venture
capital by private and institutional
investors.
M1C2-12
Reform 2:
Annual
Competition
Laws
Milestone
Entry into force of
implementing
measures
(including
secondary
legislation, if
necessary) for the
implementation
and application of
the measures
established in the
2023 Annual
Competition Law
and other primary
legislation
Entry into force of
secondary legislation,
including all
necessary regulations
for the implementation
and application of
measures established
in the 2023 Annual
Competition Law and
other primary
legislation
N/A N/A N/A Q4 2024
Entry into force of secondary
legislation (if necessary), including
the necessary regulations for the
implementation and application of
the relevant measures established
in the 2023 Annual Competition
Law.
Entry into force of secondary
legislation on cold ironing and lists
of retail sellers of natural gas, as
follows:
For cold ironing:
Entry into force of regulatory
incentives to use cold ironing
services in ports.
For the list of retail sellers of
natural gas:
Entry into force of secondary
legislation defining the criteria and
120
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
requirements on access and
permanence of undertakings in the
list of retail sellers of natural gas
established by Article 17 of
legislative decree no. 164/2000
aimed at enhancing transparency
and supporting the choice of
consumers in competitive markets.
M1C2-13
Reform 2:
Annual
Competition
Laws
Milestone
Entry into force of
the Annual
Competition Law
for 2025
Provision indicating
the entry into force of
the Annual
Competition Law for
2025.
N/A N/A N/A Q4 2025
Entry into force of the Annual
Competition Law for 2025.
Primary and secondary legislation
(including implementing acts, if
necessary) shall be approved and
shall enter into force by 4Q 2025.
The Annual Competition Law shall:
I - on Local Public Services:
- Introduce corrective measures
and sanctions for non-
adoption, non-publication or
incompleteness of the
monitoring required by Article
30 of Legislative Decree
201/2022.
- Introduce corrective measures
in case of unsatisfactory
121
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
management* of the local
public service. Such measures
shall include, at least, the
adoption of plans to improve
quality, cost efficiency, and
meet all contractual
objectives. The reform shall
foresee that the corrective
measures are required by the
contracting authorities within
fixed deadlines.
- Introduce transparency
obligations regarding the
above-mentioned corrective
measures, ensure and where
necessary strengthen the
monitoring and enforcement
powers of the competent
regulators/authorities and
require the competent
authority to issue annually a
report to the Parliament on the
status of implementation of
the corrective measures.
* Unsatisfactory management shall
be defined as to cover, at least, the
situations in which the operator has
122
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
incurred in significant losses,
capable of putting at risk its
economic and financial viability, or
when the quality of the service is
significantly below sectorial
benchmarks or the performance is
appreciably below contractual
targets.
II - on Regional transport:
- Extend to Regional Public
Transport (including to the
“internal operators” pursuant
to Regulation (EC) no
1370/2007) the applicability of
Articles 14 paras. 2 and 3, 17,
30 and 31 of Legislative
Decree 201/2022, as reformed
above.
- Revise Art. 9 of the Annual
Competition Law no. 118/2022
in order to provide for the
requirement for the Ministry of
Infrastructures and Transport
(MIT) to publish, on an annual
basis and starting in 2026, a
suitably staggered calendar of
123
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
the award procedures of all
expiring railways contracts.
- Require ART to launch by Q2
2026 a public consultation in
view of the adoption of
guidelines for the
standardization of award
procedures for regional
transport services.
III - on Electric charging stations:
- Ensure that the award of
concessions for electric
recharging points promotes
competition by encouraging a
plurality of suppliers in the
market.
IV - on Health:
- Establish common criteria for
contractual agreements to
ensure the effective
implementation of Articles 8-
quater and 8-quinquies of
Legislative Decree 502/1992, as
amended by Law 118/2022, on
the accreditation of private
124
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
companies to the Public Health
System, and to ensure the
implementation of rules
providing for open and
transparent selection
procedures.
V. - Technology transfer:
- Require the Ministry of
Enterprises and Made in Italy
and the Ministry of University
and Research to adopt by Q2
2026 a national strategy for
technology transfer and
knowledge valorisation,
making the allocation of
available resources more
efficient, promoting a
coordinated strategy between
the various Foundations and
other institutional subjects
operating in the field of
technology transfer. The
initiative shall support and
rationalise technology transfer
offices also by promoting
federative initiatives or other
125
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
policies to enhance efficiency.
VI - on Regulated Professions:
- Simplify the requirements for
incorporation and registration of
professional companies.
M1C2-13bis
Reform 2:
Annual
Competition
Laws
Milestone
Entry into force of
legal act(s) on
Regional
Railways and
Technology
Transfer
Provision indicating
the entry into force of
legal act(s)on
Regional Railways
and Technology
Transfer
N/A N/A N/A Q2 2026
Entry into force of legal act(s) on
Regional Railways and Technology
Transfer.
These shall include:
- A Directorial Decree
providing a template for
the submission of the
calendar of tenders and
for the required
infromation/procedural
steps
- the Inter-Ministerial
decree approving the
National Strategy on
Technology Transfer.
M1C2-14
Reform 2:
Annual
Competition
Laws
Target
Millions of 2G
smart meters
installed
N/A Number 16 33 Q4 2025
At least 17 million 2G smart meters
shall be installed since March
2021.
126
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
M1C2-14bis
Reform 3:
rationalization
and
simplification
of incentives
for firms.
Milestone Entry into force of
an enabling act
Entry into force of an
enabling act for the
reform of firms’
incentives
N/A N/A N/A Q2 2025
Entry into force of an enabling act
(legge delega) mandating the
government to revise the firms’
incentives system.
M1C2-14ter
Reform 3:
Framework for
simplification
and
streamlining
of incentives
for firms.
Milestone Entry into force of
primary legislation
Entry into force of
primary legislation for
the reform of firms
incentives
N/A N/A N/A Q2 2026
Entry into force of primary
legislation introducing a legal
framework for the planning and
design of new incentives, and the
evaluation of existing ones.
127
B.3. Description of the reforms and investments for the loan
Investment 2: Innovation and technology of microelectronics
The objective of the investment is to support the development of the strategic value chain of microelectronics
by investing in Silicon Carbide substrates. The investment consists of the installation of theoretical
production capacity of 8-inch Silicon Carbide substrates.
Investment 3: Fast internet connections (Ultra Broadband and 5G)
The objective of the investment is to complete the national ultra-fast and 5G telecommunications network
throughout the national territory, contributing to the objectives of the digital transition and to reduce the
digital divide in Italy. The investment encompasses five faster connection projects:
1. “Italia a 1 Giga”, enabling at least 1 Gigabit/s in download and 200 Mbit/s in upload connectivity in
next generation access (NGA) market failure areas, as identified by the mapping exercise carried out
by Infratel in 2021 complemented by the results of the field verification activities carried out in
2023;
2. “Italia 5G”, enabling or providing 5G connections in market failure areas, as identified in the
mapping exercise carried out by Infratel in June 2021;
3. “Connected schools”, providing school premises with 1 Gigabit/s broadband connectivity;
4. “Connected health care facilities”, which shall provide 1 Gigabit/s broadband connectivity to public
health care facilities;
5. “Connected smaller islands”, providing ultra-broadband connectivity to selected smaller islands
lacking fiber links to the continent.
Investment 4: Satellite technology and space economy
The objective of the investment is to develop satellite connections in view of the digital and green transition
and to contribute to the development of the space sector. The investment consists in four projects:
1. Satcom,
2. Earth Observation (EO),
3. Space Factory,
4. In-Orbit Economy.
It is envisaged that the investment does not have military or defence objectives and implications.
Investment 5: Industrial supply chain policies and internationalization
The objective of the investment is to strengthen industrial supply chains, in particular by facilitating access to
funding, and to promote the competitiveness of enterprises (notably SMEs), in particular by supporting their
internationalisation and strengthening their resilience after the COVID-19 crisis.
The investment consists of two lines of intervention:
1. Refinancing of Fund 394/81 managed by SIMEST. It consists of the re-financing of an existing
Fund currently managed by public agency SIMEST, providing for financial support to
enterprises, notably SMEs, to support their internationalisation through various tools such as
programs to access foreign markets and development of e-commerce.
2. Competitiveness and resilience of supply chains. It consists of financial support to enterprises,
through the instrument of the Development Contract, for projects related to key strategic value
chains, such as industrial development programs, environmental protection development
programs, sustainable mobility and tourism activities.
The above interventions shall be conducted according to investment policies in line with the objectives of
Regulation (EU) 2021/241, including in relation to the application of the principle of ‘Do no significant
harm’, as further specified in the ‘Do no significant harm’ Technical Guidance (2021/C58/01).
128
In order to ensure that the measure complies with the ‘Do no significant harm’ Technical Guidance
(2021/C58/01), the legal agreement between Italy and the entrusted entity or the financial intermediary in
charge of the financial instrument and the subsequent investment policy of the financial instrument shall:
i. require the application of the Commission’s technical guidance on sustainability proofing for the
InvestEU Fund; and
ii. exclude the following list of activities and assets from eligibility: (i) activities and assets related to
fossil fuels, including downstream use1; (ii) activities and assets under the EU Emission Trading
System (ETS) achieving projected greenhouse gas emissions that are not lower than the relevant
benchmarks2; (iii) activities and assets related to waste landfills, incinerators3 and mechanical
biological treatment plants4; and (iv) activities and assets where the long-term disposal of waste may
cause harm to the environment; and
iii. require the verification of legal compliance with the relevant EU and national environmental
legislation of the projects by the entrusted entity or financial intermediary for all transactions,
including those exempted from sustainability proofing.
Investment 7: National Connectivity Fund
This measure shall consist of a public investment in a Grant Scheme “National Connectivity Fund”, in order
to incentivise private investment and improve access to finance in Italy’s ultra-broadband network
infrastructure sector. The Scheme shall operate by providing grants directly to the private sector.
The Scheme shall be managed by Invitalia S.p.A. as the implementing partner. The Scheme shall include the
following product line:
• A viability gap grant requiring at least 30% of private co-financing on the overall cost of the project.
In order to implement the investment into the Scheme, Italy and Invitalia S.p.A. shall sign an Implementing
Agreement that shall include the following content:
1. Description of the decision-making process of the Scheme: The final award decision of the Scheme
shall be taken by an investment committee or other relevant equivalent governing body and
approved by a majority of votes from members who are independent from the government.
2. Key requirements of the associated grant policy,which shall include:
a) The description of the grants provided and eligible final beneficiaries.
b) The requirement that all investments supported are economically viable.
c) The requirement to comply with the ‘Do no significant harm’ (DNSH) principle as set out in
the DNSH Technical Guidance (2021/C58/01): In particular, the grant policy shall exclude the
following list of activities and assets from eligibility: (i) activities and assets related to fossil
1 Except projects under this measure in power and/or heat generation, as well as related transmission and distribution
infrastructure, using natural gas, that are compliant with the conditions set out in Annex III of the ‘Do no significant
harm’ Technical Guidance (2021/C58/01). 2 Where the activity supported achieves projected greenhouse gas emissions that are not significantly lower than the
relevant benchmarks an explanation of the reasons why this is not possible should be provided. Benchmarks established for free allocation for activities falling within the scope of the Emissions Trading System, as set out in the Commission
Implementing Regulation (EU) 2021/447. 3 This exclusion does not apply to actions under this measure in plants exclusively dedicated to treating non-recyclable
hazardous waste, and to existing plants, where the actions under this measure are for the purpose of increasing energy
efficiency, capturing exhaust gases for storage or use or recovering materials from incineration ashes, provided such
actions under this measure do not result in an increase of the plants’ waste processing capacity or in an extension of the
lifetime of the plants; for which evidence is provided at plant level. 4 This exclusion does not apply to actions under this measure in existing mechanical biological treatment plants, where
the actions under this measure are for the purpose of increasing energy efficiency or retrofitting to recycling operations
of separated waste to compost bio-waste and anaerobic digestion of bio-waste, provided such actions under this measure
do not result in an increase of the plants’ waste processing capacity or in an extension of the lifetime of the plants; for
which evidence is provided at plant level.
129
fuels, including downstream use5, (ii) activities and assets under the EU Emission Trading
System (ETS) achieving projected greenhouse gas emissions that are not lower than the
relevant benchmarks6, (iii) activities and assets related to waste landfills, incinerators7 and
mechanical biological treatment plants8.
d) The requirement that final beneficiaries of the Scheme shall not receive support from other
Union instruments to cover the same cost.
3. The amount covered by the Implementing Agreement, the fee structure for the Implementing Partner
and the requirement to use any unused proceeds of the scheme, including beyond 2026, for the same
policy purposes.
4. Monitoring, audit, and control requirements, including:
1. The description of the implementing partner’s monitoring system to report on the grants
mobilized.
2. The description of the implementing partner’s procedures that will ensure the prevention,
detection and correction of fraud, corruption, and conflicts of interests.
3. The obligation to verify the eligibility of every operation in accordance with the
requirements laid out in the Implementing Agreement before awarding a grant to an
operation.
4. The obligation of carrying out risk-based ex-post audits in accordance with an audit plan of
Invitalia S.p.A. These audits shall verify i) that the control systems are effective, including
the detection of fraud, corruption, and conflict of interests; ii) compliance with the DNSH
principle, the State Aid rules; and iii) that the requirement that final beneficiaries of the
Scheme have not received support from other Union instruments to cover the same cost is
respected. The audits shall also verify the legality of the transactions and that the conditions
of the applicable Implementing Agreement and Grant Agreements are being respected.
Investment 8: InvestEU Member State Compartment
This measure shall consist of a public investment in the InvestEU Member State compartment in order to
incentivise private investment and improve access to finance in sectors that may include but are not limited
to manufacturing and construction. The contribution to the InvestEU Member State Compartment shall be
used to enhance the competitiveness of SMEs, other companies and the Italian economy at large, supporting
for example social and sustainable infrastructure projects, as well as initiatives in research, innovation and
5 Except for (a) assets and activities in power and/or heat generation, as well as related transmission and distribution
infrastructure, using natural gas, that are compliant with the conditions set out in Annex III of the ‘Do no significant
harm’ Technical Guidance (2021/C58/01) and (b) activities and assets under point (ii) for which the use of fossil fuels is
temporary and technically unavoidable for the timely transition towards a fossil fuel free operation. 6 Where the activity supported achieves projected greenhouse gas emissions that are not significantly lower than the
relevant benchmarks, an explanation of the reasons why this is not possible shall be provided. Benchmarks established
for free allocation for activities falling within the scope of the Emissions Trading System, as set out in the Commission
Implementing Regulation (EU) 2021/447. 7 This exclusion does not apply to actions under this measure in plants exclusively dedicated to treating non-recyclable
hazardous waste, and to existing plants, where the actions under this measure are for the purpose of increasing energy
efficiency, capturing exhaust gases for storage or use or recovering materials from incineration ashes, provided such
actions under this measure do not result in an increase of the plants’ waste processing capacity or in an extension of the
lifetime of the plants; for which evidence is provided at plant level. 8 This exclusion does not apply to actions under this measure in existing mechanical biological treatment plants, where
the actions under this measure are for the purpose of increasing energy efficiency or retrofitting to recycling operations
of separated waste to compost bio-waste and anaerobic digestion of bio-waste, provided such actions under this measure
do not result in an increase of the plants’ waste processing capacity or in an extension of the lifetime of the plants; for
which evidence is provided at plant level.
130
digitalisation. This financial product shall operate by providing, for example, guarantees, loans and equity
directly or through intermediaries to the private sector, as well as to public sector entities engaged in similar
activities.
A guarantee agreement between the Commission and one (or several) implementing partner(s), selected in
accordance with the relevant provisions of Regulation (EU) 2021/523 of the European Parliament and of the
Council of 24 March 2021 establishing the InvestEU Programme and amending Regulation (EU) 2015/1017,
shall enter into force.
Italy shall sign a contribution agreement with the European Commission that shall include:
- The proposed Implementing Partner(s).
- The requirement of compliance with the DNSH Technical Guidance (2023/C111). If necessary, the
amended Guarantee Agreements shall exclude the following list of activities and assets from
eligibility: (i) activities and assets related to fossil fuels, including downstream use9; (ii) activities
and assets under the EU Emission Trading System (ETS) achieving projected greenhouse gas
emissions that are not lower than the relevant benchmarks10; (iii) activities and assets related to waste
landfills, incinerators11 and mechanical biological treatment plants12 .
- The description of the monitoring system to be used to report on the funds being mobilized.
Investment 9: Scale-up measure: Transition 4.0
The objective of the measure is to support the digital transformation of businesses by incentivising private
investment in assets and activities supporting digitalisation. The measure consists of a tax credit scheme.
9Except for (a) projects in power and/or heat generation, as well as related transmission and distribution infrastructure,
using natural gas, that are compliant with the conditions set out in Annex III of the ‘Do no significant harm’ Technical
Guidance (2021/C58/01) and (b) activities and assets under point (ii) for which the use of fossil fuels is temporary and
technically unavoidable for the timely transition towards a fossil fuel free operation. 10 Where the activity supported achieves projected greenhouse gas emissions that are not significantly lower than the
relevant benchmarks, an explanation of the reasons why this is not possible shall be provided. Benchmarks established
for free allocation for activities falling within the scope of the Emissions Trading System, as set out in the Commission
Implementing Regulation (EU) 2021/447. 11 This exclusion does not apply to actions in plants exclusively dedicated to treating non-recyclable hazardous waste,
and to existing plants, where the actions are for the purpose of increasing energy efficiency, capturing exhaust gases for
storage or use or recovering materials from incineration ashes, provided such actions do not result in an increase of the
plants’ waste processing capacity or in an extension of the lifetime of the plants; for which evidence is provided at plant
level. 12 This exclusion does not apply to actions in existing mechanical biological treatment plants, where the actions are for
the purpose of increasing energy efficiency or retrofitting to recycling operations of separated waste to compost bio-
waste and anaerobic digestion of bio-waste, provided such actions do not result in an increase of the plants’ waste
processing capacity or in an extension of the lifetime of the plants; for which evidence is provided at plant level.
131
B.4. Milestones, targets, indicators, and timetable for monitoring and implementation for the loan
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and
target
Unit of
measure Baseline Goal Quarter Year
M1C2-15
Investment 2:
Innovation and
technology of
microelectronics
Milestone
Production
capacity of
Silicon
Carbide
substrates
Installed
theoretical
production
capacity of 8-
inch Silicon
Carbide
substrates
N/A N/A N/A Q2 2026
Installed theoretical production capacity
of at least 197 028 8-inch Silicon Carbide
substrates/year.
M1C2-16
Investment 3: Fast
internet connections
(Ultra-Broadband and
5G)
Milestone
Award of all
public
contracts for
faster
connection
projects
Notification of
the award of
all public
contracts for
faster
connection
projects
N/A N/A N/A Q2 2022
Notification of the award of all public
contracts for faster connection projects,
which shall consist of (i) “Italia a 1 Giga”,
(ii) “Italia 5G”, (iii) “Connected schools”,
(iv) “Connected healthcare facilities”; and
(v) “Connected smaller islands”.
M1C2-17
Investment 3: Fast
internet connections
(Ultra-Broadband and
5G)
Target
House
numbers
enabled with 1
Gbps
connectivity
N/A Number 0 2 692 905 Q2 2026
At least 2 692 905 house numbers in
next generation access (NGA) market
failure areas (among which at least
266 782 located in scattered houses
areas as defined according to the 2011
ISTAT census) enabled with at least 1
Gbps connectivity via Fiber-to-the-
home/building (FTTH/B) or Fixed
Wireless Access (FWA).
132
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and
target
Unit of
measure Baseline Goal Quarter Year
M1C2-18
Investment 3: Fast
internet connections
(Ultra-Broadband and
5G)
Target
School
premises and
healthcare
facilities
provided with
1 Gbps
connectivity
N/A Number 0 17 700 Q2 2026
At least 17 700 fast broadband
connections (i.e. with at least 1 Gbps
connectivity) shall be provided, of which
at least 9 000 concerning school
premises and at least 8 700 concerning
public healthcare facilities.
M1C2-19
Investment 3: Fast
internet connections
(Ultra-Broadband and
5G)
Target
Islands
provided with
ultra-
broadband
connectivity
N/A Number 0 18 Q4 2024
At least additional 18 islands lacking fiber
links to the continent provided with ultra-
broadband connectivity trough new
optical backhaul.
M1C2-20
Investment 3: Fast
internet connections
(Ultra-Broadband and
5G)
Target
Extra-urban
roads and
TEN-T
corridors
enabled with
5G coverage
N/A Number 0 12 600 Q2 2026
A total of at least 12 600 km of extra-
urban roads and TEN-T corridors
enabled with 5G coverage.
M1C2-21
Investment 3: Fast
internet connections
(Ultra-Broadband and
5G)
Target
Market failure
areas enabled
or provided
with 5G
coverage
N/A Number 0 1 400 Q2 2026
At least 1 400 sqkm of market failure
areas enabled with 5G coverage, out of
which, at least 500 sqkm provided with
5G coverage.
133
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and
target
Unit of
measure Baseline Goal Quarter Year
M1C2-22
Investment 4: Satellite
Technology and Space
economy
Milestone
Award of all
public
contracts for
satellite
technology
and space
projects
Notification of
the award of
all public
contracts for
satellite
technology
and space
projects
N/A N/A N/A Q1 2023
Notification of the award of all public
contracts for satellite technology and
space projects, which shall consist of (i)
Satcom, (ii) Earth Observation, (iii)
Space Factory, and (iv) In-Orbit
economy.
M1C2-23 bis
Investment 4: Satellite
Technology and Space
economy
Milestone
Satellite
technology
and space
projects
Final reports
for satellite
technology
and space
projects and
payment
orders issued
to the
implementing
bodies
N/A N/A N/A Q2 2026
A total value of at least
EUR 1 340 000 000 of payment orders
shall be issued to the implementing
bodies (Italian Space Agency and
European Space Agency).
Final reports from the implementing
bodies are delivered for the following
activities:
1. Satcom: creation of dual-use
technologies and systems to be used
for the provision of highly secure
satellite communication services for
governmental use.
2. Earth Observation (EO), which
consists of (i) upstream activities:
including specification, design,
manufacturing of a multisensor
constellation of constellations for
134
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and
target
Unit of
measure Baseline Goal Quarter Year
remote sensing (Synthetic Aperture
Radar (SAR), hyperspectral, optical)
and the procurement of launches
focused on monitoring land, sea and
atmosphere; at least one
constellation or proof of concept of
constellations is in orbit (ii)
downstream activities: CyberItaly
Project, Marketplace and related
services.
3. Space Factory, consisting of two
sub-projects: (i) Space Factory 4.0:
(integrated lines for Manufacturing,
Assembly, Integration and Testing
(M-AIT) of small satellites); (ii)
Access to Space: R&D and
prototyping for the realization of
green technologies for future
generation of thrusters and
launchers.
4. In-Orbit Economy: activities for a
demonstrator for in orbit servicing
technologies; the increase of the
national Space Surveillance and
Tracking (SST) capacity; design and
manufacturingof assets for the
acquisition and management and
provision of the data service in
135
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and
target
Unit of
measure Baseline Goal Quarter Year
support of Space Traffic
Management activities.
M1C2-26
Investment 5.1:
Refinancing and
remodelling of Fund
394/81 managed by
SIMEST
Milestone
Entry into
force of the
re-financing of
Fund 394/81
and adoption
of the
investment
policy
Provision in
the law
indicating the
entry into
force of the
Law
Decree(s)
refinancing
the grant and
loan
component of
Fund 394/81
Approval of
Decision of
the Board
establishing
the selection
criteria of the
projects to be
financed
N/A N/A N/A Q3 2021
The Law Decree(s) shall provide for the
refinancing of the grant and loan
component of Fund 394/81. The Board of
the Fund shall approve a Decision
establishing the investment policy.
The investment policy linked to the
refinancing of Fund 394/81 shall define
as a minimum: (i) the nature and scope
of the projects supported, which shall be
in line with the objectives of Regulation
(EU) 2021/241; the terms of reference
shall include eligibility criteria to ensure
compliance with the ‘Do no significant
harm’ Technical Guidance (2021/C58/01)
of supported projects under this measure
through the use of sustainability proofing,
an exclusion list, and the requirement of
compliance with the relevant EU and
national environmental legislation, (ii) the
type of operations supported, (iii) the
targeted beneficiaries, with a prevalence
of SMEs, and their eligibility criteria, (iv)
provisions to re-invest potential reflows
for similar policy objectives, also beyond
2026, in case they are not re-used to re-
136
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and
target
Unit of
measure Baseline Goal Quarter Year
pay interest rates stemming from loans
provided under Regulation (EU)
2021/241.
The contractual agreement with the
entrusted entity or financial intermediary
shall require the use of the ‘Do no
significant harm’ Technical Guidance
(2021/C58/01).
M1C2-27
Investment 5.1:
Refinancing and
remodelling of Fund
394/81 managed by
SIMEST
Target
SMEs that
received
support from
Fund 394/81
N/A Number 0 4 000 Q4 2021
At least additional 4 000 SMEs received
support from Fund 394/81 starting from 1
January 2021.
M1C2-28
Investment 5.2:
Competitiveness and
resilience of supply
chains
Milestone
Entry into
force of a
decree
including the
investment
policy of the
Development
Contracts
Provision in
the law
indicating the
entry into
force of the
decree
N/A N/A N/A Q1 2022
The investment policy of the
Development Contracts shall define as a
minimum: (i) the nature and scope of the
projects supported, which shall be in line
with the objectives of Regulation (EU)
2021/241; the terms of reference shall
include eligibility criteria to ensure
compliance with the ‘Do no significant
harm’ Technical Guidance (2021/C58/01)
of supported projects under this measure
through the use of sustainability proofing,
an exclusion list, and the requirement of
compliance with the relevant EU and
137
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and
target
Unit of
measure Baseline Goal Quarter Year
national environmental legislation, (ii) the
type of operations supported, (iii) the
targeted beneficiaries and their eligibility
criteria, (iv) provisions to re-invest
potential reflows for similar policy
objectives, also beyond 2026, in case
they are not re-used to re-pay interest
rates stemming from loans provided
under Regulation (EU) 2021/241.
The contractual agreement with the
entrusted entity or financial intermediary
shall require the use of the ‘Do no
significant harm’ Technical Guidance
(2021/C58/01).
M1C2-29
Investment 5.2:
Competitiveness and
resilience of supply
chains
Target
Development
Contracts
approved
N/A Number 0 40 Q4 2023
At least 40 Development Contracts
approved, in line with their investment
policy. The satisfactory fulfilment of the
target also depends on the activation of
at least EUR 1 500 million of
investments.
M1C2-30 Investment 7: National
Connectivity Fund Milestone
Implementing
Agreement
Entry into
force of the
Implementing
Agreement
N/A N/A N/A Q4 2025
Entry into force of the Implementing
Agreement.
138
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and
target
Unit of
measure Baseline Goal Quarter Year
M1C2-31 Investment 7: National
Connectivity Fund Milestone
Legal
agreements
signed with
final
beneficiaries
Legal
agreements
signed and
certificate of
transfer
N/A N/A N/A Q2 2026
Invitalia S.p.A. shall have entered into legal grant agreements with final beneficiaries for an amount necessary to use 100% of the RRF investment into the Scheme (taking into account management fees).
Italy shall transfer EUR 733 402 818 to
Invitalia S.p.A. for the Facility.
M1C2-32
Investment 8: InvestEU
Member State
Compartment
Milestone
Signature of
the
Contribution
Agreement
between the
government of
Italy and the
European
Commission
Signature of
the
Contribution
Agreement
N/A N/A N/A Q1 2026
Signature of the Contribution Agreement between the government of Italy and the European Commission for an amount of EUR 500 000 000.
M1C2-33
Investment 8: InvestEU
Member State
Compartment
Target
Financing or
investment
operations
approved by
the InvestEU
Investment
Committee.
N/A Percentage 0 100 Q2 2026
Financing or investment operations amounting to 100% of the total amount of RRF resources allocated to the instrument shall have been approved by the InvestEU Investment Committee.
M1C2-34 Investment 9: Scale-up Target Transition 4.0 N/A Number 0 53 110 Q2 2026 At least 53 110 Transition 4.0 tax credits
have been granted to firms in relation to
139
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and
target
Unit of
measure Baseline Goal Quarter Year
measure: Transition 4.0 tax credits
granted to
firms based
on documents
presented in
2021-2026
4.0 tangible capital goods, 4.0 intangible
capital goods, standard intangible capital
goods, research, development and
innovation activities. A tax credit shall be
considered granted with the presentation
of a tax return or with the presentation to
the Gestore Servizi Energetici (“GSE”) of
completion forms for the years 2024 and
2025. Tax returns shall be presented
between 1 January 2021 and 31
December 2024. For firms whose tax
year does not correspond to the calendar
year, the end of the considered period for
the presentation of the tax returns related
to all the above-listed tax credits shall be
extended from 31 December 2024 to
30 November 2025.
Completion forms shall be presented to
GSE by 31 March 2026.
No tax returns or communication to GSE with a credit related to sectors of activity identified by ATECO codes 05, 06, 07 and 09 shall be considered for the target. In addition, concerning investments in 4.0 tangible capital goods as well as in development and innovation activities, no tax returns or communication to GSE with a credit related to sectors of activity
140
Sequential
Number Measure
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and
target
Unit of
measure Baseline Goal Quarter Year
identified by ATECO codes 30, 08, 22, 29, 38, 41, 42, 43, 17, 01, 50, 19, 20, 51, 24, 49, 23 and 35 shall be considered for the target.
141
C. MISSION 1 COMPONENT 3: Tourism and Culture 4.0.
This component of the Italian recovery and resilience plan focuses on relaunching two sectors heavily
hit by the Covid crisis: culture and tourism. The measures related to the culture sector aim at making
cultural sites more accessible both digitally and physically, more energy efficient and safer with
respect to natural disasters, at supporting the recovery of the cultural and creative sectors, including
by supporting the attractiveness of small cultural sites and rural architecture as also to enhance
territorial cohesion. Three sets of measures are envisaged: i) interventions to develop the cultural
heritage for the next generation, including investment for the digital transition and to improve the
energy efficiency of cultural sites, ii) culture-led regeneration of small historical sites, religious and
rural heritage; iii) interventions for cultural and creative industries 4.0. Measures related to tourism
aim at enhancing the competitiveness of the sector, including by reducing the fragmentation of the
sector and enhancing the economies of scale, improving and upgrading the standards of the hospitality
sector, encouraging digital innovation and the use of new technologies by operators, and support the
green transition of the sector. In this respect, measures are envisaged to support firms, including
SMEs, working in the tourism sector and tourist operators, including through investment in digital
tools.
The investments and reforms under this component shall contribute addressing the Country- Specific
Recommendations addressed to Italy, in particular on the need to “promote private investment to
foster the economic recovery and focus investment on the green and digital transition” (Country
Specific Recommendation 3, 2020). They also support social and territorial cohesion and the
competitiveness of the Italian economy, while promoting the digitalisation and sustainability of the
tourism sector.
C.1. Description of the reforms and investments for non-repayable financial support
Investment 1.1 Digital Strategy and Platforms of Culture Heritage
The objective of this measure is to digitise the Italian cultural heritage and provide access to cultural
resources and digital services. The measure consists in creating a digital infrastructure to collect,
integrate and retain digital resources, making them available for public use through dedicated
platforms.
Investment 1.2: Removal of physical and cognitive barriers in museums, libraries and archives
to enable wider access and participation in culture
The objective of this measure is to enable physical and cognitive access to a number of Italian cultural
institutions. The measure consists in removing architectural and cognitive barriers in Italian cultural
institutions.
Investment 1.3: Improve energy efficiency, in cinema, theatres and museums
The objective of this measure is to increase the energy efficiency of cultural and creative premises,
such as public and private museums, cinemas, and theatres. The measure consists of energy efficiency
interventions in cultural and creative premises.
Reform 3.1: Adoption of minimum environmental criteria for cultural events
The aim of the reform is to improve the ecological footprint of cultural events (such as exhibitions,
festivals, cultural events and musical events) by including social and environmental criteria in public
procurement for cultural events funded, promoted or organised by the public authority.
Investment 3.3: Capacity building for culture operators to manage the digital and green
transition
142
The overall objective of the investment is to support the recovery of the cultural and creative sectors.
This consists of two interventions.
The first intervention (Supporting the recovery of cultural activities by encouraging innovation and
the use of digital technology throughout the value chain) aims to support cultural and creative
operators to implement digital strategies and to increase their management capacities.
The second intervention (Promoting a green approach throughout the cultural and creative chain) aims
to encourage an environmentally sustainable approach throughout the chain, reducing the ecological
footprint, promoting innovative and inclusive eco-design, including in the context of the circular
economy, in order to steer the public towards more responsible environmental behaviour.
In order to ensure that the measure complies with the ‘Do no significant harm’ Technical Guidance
(2021/C58/01), the eligibility criteria contained in terms of reference for upcoming calls for projects
shall exclude the following list of activities: (i) activities related to fossil fuels, including downstream
use13; (ii) activities under the EU Emission Trading System (ETS) achieving projected greenhouse gas
emissions that are not lower than the relevant benchmarks14; (iii) activities related to waste landfills,
incinerators15 and mechanical biological treatment plants16; and (iv) activities where the long-term
disposal of waste may cause harm to the environment. The terms of reference shall additionally
require that only activities that comply with relevant EU and national environmental legislation may
be selected.
Investment 4.1: Digital Tourism Hub
The objective of this measure is to enable the entire tourism ecosystem to increase, integrate, and
disseminate its own offer. The measure consists of the creation of a Digital Tourism Hub, accessible
via a dedicated web platform.
Reform 4.1: Regulation ordering of the professions of tourist guides
The investment in the Digital Tourism Hub is complemented by a reform to streamline the touristic
guides regulations. The measure provides, with due regard for local regulation, a professional
organisation for tourist guides and their area of origin. The systematic and uniform application of the
reform would make it possible to regulate the fundamental principles of the profession and to
13 Except for (a) projects under this measure in power and/or heat generation, as well as related transmission and
distribution infrastructure, using natural gas, that are compliant with the conditions set out in Annex III of the
‘Do no significant harm’ Technical Guidance (2021/C58/01) and (b) activities and assets under point (ii) for
which the use of fossil fuels is temporary and technically unavoidable for the timely transition towards a fossil
fuel free operation. 14 Where the activity supported achieves projected greenhouse gas emissions that are not significantly lower
than the relevant benchmarks an explanation of the reasons why this is not possible should be provided.
Benchmarks established for free allocation for activities falling within the scope of the Emissions Trading
System, as set out in the Commission Implementing Regulation (EU) 2021/447. 15 This exclusion does not apply to actions under this measure in plants exclusively dedicated to treating non-
recyclable hazardous waste, and to existing plants, where the actions under this measure are for the purpose of
increasing energy efficiency, capturing exhaust gases for storage or use or recovering materials from
incineration ashes, provided such actions under this measure do not result in an increase of the plants’ waste
processing capacity or in an extension of the lifetime of the plants; for which evidence is provided at plant level. 16 This exclusion does not apply to actions under this measure in existing mechanical biological treatment
plants, where the actions under this measure are for the purpose of increasing energy efficiency or retrofitting to
recycling operations of separated waste to compost bio-waste and anaerobic digestion of bio-waste, provided
such actions under this measure do not result in an increase of the plants’ waste processing capacity or in an
extension of the lifetime of the plants; for which evidence is provided at plant level.
143
standardize the levels of service provision throughout the national territory, with a positive effect on
the market. The reform shall include training and further training in order to best support the offer.
144
C.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Sequential
Number Measure
Milestone
/ Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
M1C3-2
Investment - 1.1
Digital Strategy and
Platforms for
Cultural Heritage
Target Published digital
media resources N/A Number 0 65 000 000 Q4 2025
At least 65 000 000 digital media resources
shall be published.
M1C3-3
Investment - 1.2
Removal of physical
and cognitive
barriers in
museums, libraries
and archives to
enable wider access
to and participation
in culture
Target
Interventions in
museums,
monuments,
archaeological
areas and parks,
archives and
libraries
N/A Number 0 617 Q2 2026
The certificates of completion of works and/or
services shall be issued for a total of at least
617 museums, monuments, archaeological
areas and parks, archives and libraries.
M1C3-4
Investment - 1.3
Improve energy
efficiency in cinema,
theatres and
museums
Target
Interventions on
State museums
and cultural sites,
theatrical halls
and cinemas
concluded (first
batch)
N/A Number 0 80 Q3 2023
The indicator refers to the number of
interventions concluded as proved by the
certification of regular execution of the works.
The type of interventions to be completed
include:
- technical and economic-financial planning,
energy audits, initial environmental
analyses, environmental impact
assessment, reliefs and assessments
aimed at identifying critical issues,
identification of the consequent
145
Sequential
Number Measure
Milestone
/ Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
interventions for the improvement of
energy performance;
- interventions on the building envelope;
- interventions of replacement/acquisition of
equipment, tools, systems, devices, digital
application software, as well as accessory
instrumentation for their operation, the
acquisition of patents, licenses and know-
how;
- installation of intelligent systems for remote
control, regulation, management,
monitoring and optimisation of energy
consumption (smart buildings) and
polluting emissions also through the use of
technological mixes.
M1C3-5
Investment – 1.3
Improve energy
efficiency in cinema,
theatres and
museums
Target
Interventions on
State museums
and cultural sites,
theatrical halls
and cinemas are
concluded
(second batch)
N/A Number 80 420 Q4 2025
The certificates of completion of works shall be
issued for at least 340 interventions, including
for:
1. technical and economic-financial
planning, energy audits, initial
environmental analyses,
environmental impact assessment,
reliefs and assessments aimed at
identifying critical issues,
identification of the consequent
146
Sequential
Number Measure
Milestone
/ Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
interventions for the improvement of
energy performance;
2. interventions on the building
envelope;
3. interventions of
replacement/acquisition of
equipment, tools, systems, devices,
digital application software, as well as
accessory instrumentation for their
operation, the acquisition of patents,
licenses and know-how;
4. installation of intelligent systems for
remote control, regulation,
management, monitoring and
optimisation of energy consumption
(smart buildings) and polluting
emissions also through the use of
technological mixes.
M1C3-6
Reform – 3.1
Minimum
Environmental
Criteria for Cultural
events
Milestone
Entry into force a
decree defining
social and
environmental
criteria in public
procurement
tenders
concerning
cultural events
Provision in
the decree
mentioning
the entry into
force of
decree for the
adoption of
minimum
environmenta
l criteria for
N/A N/A N/A Q4 2022
Criteria shall be adopted for the following
aspects: reduction in the use of paper and
prints, use of eco-friendly materials, stage set-
up made with recycled and reused materials
and sustainable furnishings, low environmental
impact gadgets, selection of the location based
on the protection of biodiversity, low
environmental impact catering services,
transport to reach the event and transport of
materials, energy consumption for the
147
Sequential
Number Measure
Milestone
/ Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
publicly financed cultural
events
organization of the event.
Social criteria promoting accessibility and
inclusion shall include : the promotion of
accessibility for persons with disabilities; the
promotion of opportunities for youth
employment, for the long-term unemployed, for
people belonging to disadvantaged groups
(such as migrant workers and ethnic minorities)
and for people with disabilities ; to ensure equal
access to procurement for businesses whose
owners or employees belong to ethnic or
minority groups, such as cooperatives, social
enterprises and non-profit organizations; the
promotion of “decent work” understood as the
right to productive and freely chosen work, to
fundamental principles and rights at work, to
decent wages, social protection and social
dialogue.
The reform shall cover cultural events such as
exhibitions, festivals and performing arts
events.
M1C3-7
Investment – 3.3
Capacity building for
culture operators to
manage the digital
and green
Milestone
Award of all public
contracts with the
implementing
organisation/bene
ficiaries for all
interventions to
Notification of
the award of
all public
contracts for
the
organisations
N/A N/A N/A Q4 2023
The selected implementing bodies shall be
specialized organizations or networks that
possess skills and experience both in the field
of training and in the field of cultural production,
environment, cultural management and
148
Sequential
Number Measure
Milestone
/ Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
transition. manage the digital
and green
transition of
cultural operators
and networks
that shall be
in charge of
the realization
of the
capacity
building
activities
training.
Notification of the award of all public contracts
for projects selected under the competitive calls
for proposals, shall be in compliance with the
’Do no significant harm’ Technical Guidance
(2021/C58/01) through the use of an exclusion
list and the requirement of compliance with the
relevant EU and national environmental
legislation
M1C3-8 Investment – 4.1
Digital Tourism Hub Milestone
Award of the
contracts for the
development of
the Digital Tourism
Portal
Notification of
the award of
all public
contracts for
the
development
of the Digital
Tourism
Portal
N/A N/A N/A Q4 2021
Notification of the award of (all) public contracts
for the development of the Digital Tourism
Portal.
The Digital Tourism Portal shall upgrade the
current Italia.it portal through the
implementation of a cloud and open
architecture, greatly favouring interconnection
with the ecosystem. The upgraded portal shall
include: the creation of a new front-end
interface and navigation tree; the review of the
layout, structure and functionalities of the
sections, pages and articles; the introduction of
maps; multilingual management (at the time of
the switch, the portal will be presented in Italian
and English). The integration of the other,
currently supported, languages is expected in
the months that immediately follow the
149
Sequential
Number Measure
Milestone
/ Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
commissioning.
Award of the contracts to the projects selected
under the competitive calls for proposals, in
compliance with the ’Do no significant harm’
Technical Guidance (2021/C58/01) through the
use of an exclusion list and the requirement of
compliance with the relevant EU and national
environmental legislation.
M1C3-9 Investment 4.1
Digital Tourism Hub Target
Registration of
tourism operators
in the Digital
Tourism Hub
N/A Number 0 20 000 Q2 2024
The number of tourism operators registered in
the hub (which may include, but it is not limited
to, hotel, tour operator, and firms as defined by
ATECO codes 55.00.00; 56.00.00; 79.00.00
and other structures belonging to the sector)
shall be at least 20 000.
Al least 7 400 tourism operators (that is, 37% of
20 000) shall be located in the South.
M1C3-10
Reform 4.1
Regulation ordering
of the professions of
tourist guides.
Milestone
Definition of a
national standard
for tourist guides
The definition
of the
minimum
national
standard shall
not imply the
creation of a
new
regulated
N/A N/A N/A Q2 2024
The definition of the minimum national standard
shall not imply the creation of a new regulated
profession.
The reform shall also provide for training and
professional updating in order to better support
the offer. The reform shall qualify as a method
for the acquisition of a unique professional
qualification adopted with uniform standards at
national level through a National Law and
150
Sequential
Number Measure
Milestone
/ Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
profession subsequent implementing Ministerial Decrees
of Understanding State Regions.
M1C3-11
Investment 1.3 –
Improve energy
efficiency in cinema,
theatres and
museums
Milestone
Entry into force of
the Ministry of
Culture decree for
the allocation of
resources:
to improve energy
efficiency in
places of culture
Provision in
the decree
indicating the
entry into
force of the
Ministry of
Culture (MIC)
decree for the
allocation of
resources to
improve
energy
efficiency in
places of
culture
N/A N/A N/A Q2 2022
Places of culture refers to cinemas, theatres
and museums.
(Inv. 1.3) For museums and places of culture to
improve energy efficiency, the intervention is
implemented through a recognition of the
project proposals at State cultural sites Ministry
of Culture (MiC) in the Objective 1 case.
Otherwise, the identification of non-state
institutions, in Objective 2 and 3 cases, shall be
carried out through calls for tenders.
The award of the contracts to the projects
selected under the competitive calls for
proposals, shall be in compliance with the ’Do
no significant harm’ Technical Guidance
(2021/C58/01) through the use of an exclusion
list and the requirement of compliance with the
relevant EU and national environmental
legislation.
151
C3. Description of the reforms and investments for the loan
Investment 4.1: Digital Tourism Hub
The objective of this measure is to enable the entire tourism ecosystem to increase, integrate, and
disseminate its own offer. The measure consists of the creation of a Digital Tourism Hub, accessible via a
dedicated web platform.
Investment 2.1: Attractiveness of Small Historic Towns
The objective of this measure is to support the economic and social development of disadvantaged areas
based on the cultural regeneration of small towns and the growth of local economies and tourism in
particular. The investment consists in supporting cultural, social and tourism-related infrastructure, services
and activities.
Investment 2.2: Protection and enhancement of rural architecture and landscape
The objective of this measure is to improve rural and countryside surroundings. The measure consists in
supporting protection and enhancement of rural architecture and landscape.
Investment 2.3: Programmes to preserve and refurbish historical parks and gardens
The objective of this measure is to preserve and refurbish historical parks and gardens, including by restoring
architectural or vegetation components, ensuring safety and accessibility, upgrading technical systems, and
acquiring innovative digital tools for education and visitor assistance. The measure consists in refurbishing
historical parks and gardens.
Investment 2.4: Seismic safety of places of worship, restoration of FEC heritage and shelters for art
works (Recovery Art)
The objective of this measure is to reduce seismic risk on worship places. The investment consists in putting
in place an anti-seismic preventive action plan, in the execution of seismic retrofitting of worship buildings,
in the restoration of FEC (Fondo Edifici di Culto) heritage assets, and the construction of shelters for art
works.
Investment 4.2: Funds for the competitiveness of tourism enterprises
The measure aims at supporting firms operating in the tourism sector. It includes a tax credit for works aimed
at improving accommodation facilities, a guarantee fund to facilitate access to credit for firms in the sector
(through a dedicated section of the SMEs Guarantee Fund), the activation of the EIB Thematic Fund for
Tourism to support innovative investment in the sector, an equity fund (National Tourism Fund) for the
redevelopment of properties with high tourist potential. An additional financial instrument (FRI - Fondo
Rotativo), shall complement the abovementioned measures to support firms operating in the tourism sector.
The above interventions shall be conducted according to investment policies in line with the objectives of
Regulation (EU) 2021/241, including in relation to the application of the principle of ‘do no significant
harm’, as further specified in the Technical guidance on the application of ‘do no significant harm’ under the
Recovery and Resilience Facility Regulation (2021/C58/01).
In order to ensure that the measure complies with the ‘Do no significant harm’ Technical Guidance
(2021/C58/01), the legal agreement and the subsequent investment policy of the financial instruments shall
i. require the application of the Commission’s technical guidance on sustainability proofing for the
InvestEU Fund; and
152
ii. exclude the following list of activities: (i) activities related to fossil fuels, including downstream use17;
(ii) activities under the EU Emission Trading System (ETS) achieving projected greenhouse gas
emissions that are not lower than the relevant benchmarks18; (iii) activities related to waste landfills,
incinerators19 and mechanical biological treatment plants20; and (iv) activities where the long-term
disposal of waste may cause harm to the environment; and
iii. require the verification of legal compliance with the relevant EU and national environmental
legislation of the projects by the entrusted entity or financial intermediary for all transactions,
including those exempted from sustainability proofing.
Investment 3.2: Development of the film industry (Cinecittà project)
The objective of this measure is to enhance the Italian film and audiovisual sector. The investment consists in
renovating studios and building new ones, improving production activities. This may include but it is not
limited to conservation and digitalisation of the audiovisual heritage at the Experimental Centre for
Cinematography, as well as strengthening professional profiles and skills in the sector through training
activities carried out by Cinecittà and the Experimental Centre for Cinematography.
Investment 4.3: Caput Mundi Next Generation EU for touristic great events.
The objective of this measure is to improve the experience of tourist great events and the sustainability of
tourism through the renovation of monuments, the creation of tourist and cultural alternatives with respect to
crowded areas, the digitisation of cultural and tourism services, and the enhancement of green areas. The
investment consists in the adoption and implementation of the “Caput Mundi” programme.
17 Except for (a) projects under this measure in power and/or heat generation, as well as related transmission and
distribution infrastructure, using natural gas, that are compliant with the conditions set out in Annex III of the ‘Do no
significant harm’ Technical Guidance (2021/C58/01) and (b) activities and assets under point (ii) for which the use of
fossil fuels is temporary and technically unavoidable for the timely transition towards a fossil fuel free operation. 18 Where the activity supported achieves projected greenhouse gas emissions that are not significantly lower than the
relevant benchmarks an explanation of the reasons why this is not possible should be provided. Benchmarks established
for free allocation for activities falling within the scope of the Emissions Trading System, as set out in the Commission
Implementing Regulation (EU) 2021/447. 19 This exclusion does not apply to actions under this measure in plants exclusively dedicated to treating non-recyclable
hazardous waste, and to existing plants, where the actions under this measure are for the purpose of increasing energy
efficiency, capturing exhaust gases for storage or use or recovering materials from incineration ashes, provided such
actions under this measure do not result in an increase of the plants’ waste processing capacity or in an extension of the
lifetime of the plants; for which evidence is provided at plant level. 20 This exclusion does not apply to actions under this measure in existing mechanical biological treatment plants, where
the actions under this measure are for the purpose of increasing energy efficiency or retrofitting to recycling operations
of separated waste to compost bio-waste and anaerobic digestion of bio-waste, provided such actions under this measure
do not result in an increase of the plants’ waste processing capacity or in an extension of the lifetime of the plants; for
which evidence is provided at plant level.
153
C.4. Milestones, targets, indicators, and timetable for monitoring and implementation for the loan
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
M1C3-9bis
Investment 4.1
Digital Tourism
Hub
Target
Registration of
enterprises,
including
individual
operators, in the
Digital Tourism
Hub and
accessibility of
services in the
Digital Tourism
Hub
N/A Number 20 000 35 000 Q4 2025
At least 35 000 enterprises, including
individual operators, shall be registered
in the Hub.
The following services shall be
accessible in the Digital Tourism Hub:
• Communication services for
enterprises, including
individual operators, to
propose their offer;
• Data analysis tools and
predictive models to support
data-driven decision making;
• Training for upskilling and
reskilling;
• Services for SMEs to support
innovation.
M1C3-12
Investment 2.1 –
Attractiveness of
small historic town
Milestone
Entry into force of
the Ministry of
Culture decree for
the allocation of
resources to
municipalities for
the attractiveness
of Small Historic
Towns
Provision in the
decree indicating
the entry into force
of the Ministry of
Culture decree for
the allocation of
resources to
municipalities for
the attractiveness
N/A N/A N/A Q2 2022
The Ministry of Culture decree shall
allocate resources to municipalities for
the attractiveness of Small Historic
Towns.
The municipalities involved to enhance
the attractiveness of small historic town
refer to the 250 municipalities/villages
that have transmitted to the Ministry of
154
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
of Small Historic
Towns
Culture the intervention programs
The criteria for the selection of the 250
villages (Inv. 2.1) shall be shared by
MiC, Regions, ANCI and Internal Areas
which; preliminarily they shall identify the
territorial areas eligible for (Inv2.1) due
to the complementarities between the
various programs. Following, the
selection of the villages shall be made
on the basis of a) territorial, economic
and social criteria (statistical indicators)
b) the capacity of the project to impact
on tourist attractiveness and to increase
cultural participation. The statistical
indicators taken into consideration are:
demographic size (municipalities with
pop. < 5 000 inhab.) and trend; tourist
flows, museum visitors; the consistency
of the tourist offer (hotels and other
hotels, B&Bs, rooms and rental
accommodation .); the demographic
trend of the municipality; the degree of
cultural participation of the population;
the consistency of cultural, creative and
tourism enterprises (profit and non-
profit) and related employees.
The award of the contracts to the
projects selected under the competitive
calls for proposals, shall include the
155
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
following:
a) Eligibility criteria that ensure that the
selected projects comply with the ‘Do no
significant harm’ Technical Guidance
(2021/C58/01) through the use of an
exclusion list and the requirement of
compliance with the relevant EU and
national environmental legislation.
b) Commitment that the climate
contribution of the investment as per the
methodology in Annex VI of the
Regulation (EU) 2021/241 shall account
for at least 25% of the total cost of the
investment supported by the RRF.
c) Commitment to report on the
implementation of the measure halfway
through the life of the scheme and the
end of the scheme.
M1C3-13
Investment 2.2 –
Protection and
enhancement of
rural architecture
and landscape
Milestone
Entry into force of
the Ministry of
Culture decree for
the allocation of
resources for the
protection and
enhancement of
rural architecture
and landscape
Provision in the
decree indicating
the entry into force
of the Ministry of
Culture (MIC)
decree for the
allocation of
resources for the
protection and
N/A N/A N/A Q2 2022
The Ministry of Culture decree shall
allocate the resources for the protection
and enhancement of rural architecture
and landscape.
For the protection and enhancement of
rural architecture and landscape (Inv
2.2) the selection of the assets to be
recovered shall privilege the
investment’s ability to generate effects
156
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
enhancement of
rural architecture
and landscape
on the conservation objectives of
landscape values. Priority shall be given:
- to assets located in territorial areas of
high landscape value (assets located in
areas of landscape interest or of notable
public interest (art.142-139 of DLgs
42/2004), to the landscapes subject to
UNESCO recognition, FAO GIAHS;
- to assets already available for public
use or that the owner agrees to be
accessible including within local and
integrated circuits and networks;
- to “area projects”, presented by
aggregated subjects, able to ensure
more effectively the achievement of
landscape redevelopment objectives;
- projects located in areas that enhance
the integrations and synergies with other
candidates for the PNRR and other
plans / projects of a territorial nature
supported by the programming national
(Ministry of Culture).
For the purposes of defining the types of
rural architecture subject to the
intervention, the Decree of the MiBAC 6
October 2005 (in implementation of the
Law of 24 December 2003, n.378 –
157
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
protection and enhancement of rural
architecture), may be of reference.
Preliminarily, the criteria may concern:
the state of conservation of the assets,
the levels of use, the role that these
assets play in territorial and urban
contexts.
The award of the contracts to the
projects selected under the competitive
calls for proposals, shall be in
compliance with the ’Do no significant
harm’ Technical Guidance
(2021/C58/01) through the use of an
exclusion list and the requirement of
compliance with the relevant EU and
national environmental legislation.
M1C3-14
Investment 2.3 –
Programmes to
enhance the
identity of places,
parks and historic
gardens
Milestone
Entry into force of
the Ministry of
Culture decree for
the allocation of
resources: for
projects to
enhance the
identity of places,
parks and historic
gardens
Provision in the
decree indicating
the entry into force
of the Ministry of
Culture decree for
the allocation of
resources for
projects to
enhance the
identity of places,
parks and historic
gardens
N/A N/A N/A Q2 2022
The Ministry of Culture decree shall
assign the resources to the responsible
administrations for projects to enhance
the identity of places, parks and historic
gardens.
The historic parks and gardens (Inv. 2.3)
subject to intervention are exclusively
protected cultural assets, for which
artistic or historical interest has been
declared. They may belong to both state
Ministry of Culture (MiC) and non-state
assets. The selection shall be made on
158
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
the basis of criteria that shall be defined
by a technical-scientific coordination
group, composed by representatives of
MiC, University, ANCI, sectorial
Associations.
The award of the contracts to the
projects selected under the competitive
calls for proposals, shall be in
compliance with the ’Do no significant
harm’ Technical Guidance
(2021/C58/01) through the use of an
exclusion list and the requirement of
compliance with the relevant EU and
national environmental legislation.
M1C3-15
Investment 2.4 –
Seismic safety of
place of places of
worship,
restoration of FEC
heritage and
shelters for art
works
Milestone
Entry into force of
the Ministry of
Culture decree for
the allocation of
resources for
seismic safety in
place of worship
and FEC (Fondo
Edifici di Culto)
heritage
restoration
Provision in the
decree indicating
the entry into force
of the Ministry of
Culture decree for
the allocation of
resources for
seismic safety in
place of worship
and FEC (Fondo
Edifici di Culto)
heritage
restoration
N/A N/A N/A Q2 2022
The Ministry of Culture decree shall
determine the implementing entity and
the eligibility and financing of buildings
undergoing interventions and typology.
(Inv 2.4) The seismic prevention and
safety measures of places of worship
concern the areas affected by several
earthquakes which hit Regions of Italy
from 2009 onwards (Abruzzo, Lazio,
Marche and Umbria).
The interventions of the FEC (Fondo
Edifici di Culto) are selected on the basis
of the state of conservation of the assets
159
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
of the FEC (Fondo Edifici di Culto)
heritage.
The award of the contracts to the
projects selected under the competitive
calls for proposals, shall be in
compliance with the ’Do no significant
harm’ Technical Guidance
(2021/C58/01) through the use of an
exclusion list and the requirement of
compliance with the relevant EU and
national environmental legislation.
M1C3-16
Investment – 2.1
Attractiveness of
Small Historic
Towns
Milestone
Adoption of
decree(s) listing
firms awarded
support in Small
Historic Towns
Adoption of
decree(s) listing
firms awarded
supported
N/A N/A N/A Q2 2025
Adoption of decree(s) listing at least
1 800 firms awarded support in Small
Historic Towns.
M1C3-16bis
Investment – 2.1
Attractiveness of
Small Historic
Towns
Target Interventions
carried out N/A Number 0 3 250 Q2 2026
At least 3 250 interventions, of which
400 under Line A, shall be carried out
M1C3-17
Investment – 2.2
Protection and
enhancement of
rural architecture
and landscape
Target Interventions
carried out N/A Number 0 3 900 Q2 2026
Administrative certificates confirming
that interventions have been carried out
on at least 3 900 assets.
M1C3-18 Investment 2.3
Programmes to Target Number of
historical parks N/A Number 0 100 Q4 2025 Certificates of completion of works for
the refurbishment of at least 100
160
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
preserve and
refurbish historical
parks and gardens
and gardens
refurbished
historical parks and gardens shall be
issued.
M1C3-19
Investment - 2.4
Seismic safety of
places of worship,
restoration of FEC
(Fondo Edifici di
Culto) heritage
and shelters for
art works
(Recovery Art)
Target Interventions
carried out N/A Number 0 700 Q2 2026
At least 700 interventions have been
carried out, of which one shelter for art
works and two storage lots for art works.
M1C3-20
Investment - 3.2
Development of
the film industry
(Cinecittà project)
Milestone
Signature of the
contracts between
the implementing
entity Cinecittà
SPA and the
companies in
relation to the
construction of
nine studios
Signature of the
contracts N/A N/A N/A Q2 2023
Signature of the contracts between the
implementing body, Cinecittà SPA and
the companies in relation to the
construction of nine studios.
This intervention includes the
construction of new studios, recovery of
existing studios, investments in new
digital technologies, systems and
services aimed at strengthening the
Cinecittà film studios managed by
Cinecittà SPA.
The contract between the implementing
entity Cinecittà SPA and the companies
shall contain selection/eligibility criteria
for compliance with the DNSH Technical
161
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
Guidance (2021/C58/01) of supported
assets/activities and/or companies.
Commitment/target to invest 20% in
assets/activities and/or companies
compliant with the selection criteria for
digital tagging and 70% with selection
criteria for climate tracking.
M1C3-21
Investment - 3.2
Development of
the film industry
(Cinecittà project)
Target
Construction
and/or renovation
of studios and
delivery of
services for the
Centre for
Experimental
Cinematography
N/A Number 0 9 Q2 2026
Certificates of completion of works
and/or certificates of delivery of
services/supplies for the construction
and/or renovation of at least 9 studios.
Certificates confirming the delivery of
goods and/or services and/or works for
the Centre for Experimental
Cinematography in the following lines: (i) creation of a virtual live set; (ii) e-
learning platform for cinematography;
(iii) digitalization of learning and teaching
activities; (iv) digitalization and
conservation of the audiovisual
patrimony.
M1C3-22
Investment 4.2
Funds for the
competitiveness of
tourism enterprise
Milestone
Investment policy
for the European
Investment Bank
Thematic Fund
Adoption of the
investment policy N/A N/A N/A Q4 2021
The investment policy shall define as a
minimum: the nature, scope and the
operations supported, the targeted
beneficiaries, the eligibility criteria of
financial beneficiaries and their selection
through an open call; and provisions to
re-invest potential reflows for the same
162
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
policy objectives.
The investment policy shall envisage
that 50% of the fund is dedicated to
energy efficiency measures.
The investment policy shall include
selection criteria to ensure compliance
with the ‘Do no significant harm’
Technical Guidance (2021/C58/01) of
supported transactions under this
measure through the use of
sustainability proofing, an exclusion list,
and the requirement of compliance with
the relevant EU and national
environmental legislation.
M1C3-23
Investment 4.2:
Funds for the
competitiveness of
tourism
enterprises
Milestone
Investment policy
for the National
Tourism Fund
Adoption of the
investment policy N/A N/A N/A Q4 2021
The fund is dedicated to the purchase,
restructuring and requalification of Italian
real estate properties to support tourism
development in the areas most affected
by the crisis or marginal areas (coastal
areas, minor islands, ultra-peripheral
regions and rural and mountain areas).
The investment policy shall include
selection criteria to ensure compliance
with the ‘Do no significant harm’
Technical Guidance (2021/C58/01) of
supported transactions under this
measure through the use of
sustainability proofing, an exclusion list,
163
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
and the requirement of compliance with
the relevant EU and national
environmental legislation.
M1C3-24
Investment 4.2
Funds for the
competitiveness of
tourism
enterprises
Milestone
Investment policy
for the: SME
Guarantee Fund,
Adoption of the
investment policy N/A N/A N/A Q4 2021
The investment policy shall envisage
that 50% of the fund is dedicated to
energy efficiency measures.
The investment policy shall include
selection criteria to ensure compliance
with the ‘Do no significant harm’
Technical Guidance (2021/C58/01) of
supported transactions under this
measure through the use of
sustainability proofing, an exclusion list,
and the requirement of compliance with
the relevant EU and national
environmental legislation.
M1C3-25
Investment 4.2:
Funds for the
competitiveness of
tourism
enterprises
Milestone
Investment policy
for the Fondo
Rotativo
Adoption of the
investment policy N/A N/A N/A Q4 2021
The investment policy shall envisage
that 50% of the fund is dedicated to
energy efficiency measures.
The investment policy shall include
selection criteria to ensure compliance
with the ‘Do no significant harm’
Technical Guidance (2021/C58/01) of
supported transactions under this
measure through the use of
sustainability proofing, an exclusion list,
and the requirement of compliance with
the relevant EU and national
164
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
environmental legislation.
M1C3-26
Investment 4.2:
Funds for the
competitiveness of
tourism
enterprises
Milestone
Entry into force of
the implementing
decree for the Tax
credit for the
redevelopment of
accommodation
facilities.
Provision in the
law indicating the
entry into force of
the budgetary law
enabling the tax
credits and
provision in the
related
implementing acts
indicating their
entry into force
N/A N/A N/A Q4 2021
The reference legislation for the granting
of the tax credit is Law No. 83 of May
31, 2014 introduced the recognition of a
tax credit for interventions of
redevelopment of tourist
accommodations.
Selection/eligibility criteria for
compliance with the DNSH Technical
Guidance (2021/C58/01) of supported
assets/activities and beneficiaries,
requiring at least the use of an exclusion
list and compliance with relevant EU and
national environmental acquis of the
supported assets/activities and
beneficiaries, and ensuring compliance.
M1C3-27
Investment- 4.3
Caput Mundi-Next
Generation EU for
touristic great
events
Target
Number of cultural
and touristic sites
whose
requalification
reached, on
average, 50% of
Stato
Avanzamento
Lavori (SAL)(first
batch)
N/A Number 0 100 Q4 2024
The target shall be achieved when the
average requalification progress of 100
cultural and touristic sites reaches 50%
of the advancement status indicated in
the Stato Avanzamento Lavori (SAL).
M1C3-28 Investment 4.2: Target Decree(s) N/A Number 0 2 700 Q4 2025 Decree(s) awarding the tax credit and/or
165
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
Funds for the
competitiveness of
tourism
enterprises
awarding the tax
credit and/or the
grant and receipts
of the request for
disbursement
the grant to at least 2 700 enterprises
that have invested in infrastructures
and/or services, as demonstrated by
receipts of the request for disbursement.
M1C3-29
Investment 4.2:
Funds for the
competitiveness of
tourism
enterprises
Target
Number of
projects to be
supported through
the European
Investment Bank
Thematic Funds
N/A Number 0 70 Q2 2026
The selected financial intermediaries
shall have entered into legal financing
agreements with final beneficiaries for
the support, through the EIB Thematic
Funds, of at least 70 projects.
M1C3-30
Investment 4.2:
Funds for the
competitiveness of
tourism
enterprises
Target
European
Investment Bank
Thematic Funds:
Disbursement to
the Fund of total
of EUR
350 000 000
N/A Number 0 350 000 000 Q4 2022
The disbursement shall be in line with
the investment policy defined in the
Milestone.
M1C3-31
Investment 4.2:
Funds for the
competitiveness of
tourism
enterprises
Target
National Tourism
Fund:
Disbursement to
the Fund of total
of EUR
150 000 000 for
equity support
N/A Number 0 150 000 000 Q4 2022
The disbursement shall be in line with
the investment policy defined in the
Milestone.
M1C3-32 Investment 4.2:
Funds for the Target Number of
enterprises to be N/A Number 0 1 000 Q4 2025 The outcome letter granting the
guarantee shall be issued in favour of at
166
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
competitiveness of
tourism
enterprises
supported through
the SME’s
Guarantee Fund
least 1 000 enterprises.
M1C3-33
Investment 4.2
Funds for the
competitiveness of
tourism
enterprises
Target
Fondo Rotativo: Legal agreements
signed with final
beneficiaries
N/A Number 0 300 Q4 2025
Legal financing agreements signed for
the support, through the Fondo Rotativo,
of at least 300 enterprises.
M1C3-35
– Investment - 4.3
Caput Mundi-Next
Generation EU for
touristic great
events
Milestone
Signing of each
Agreement for six
Projects between
a Ministry of
Tourism and
beneficiaries/imple
menting bodies
Publication of the
programme
Agreement
between the
Ministry of
Tourism, the
Municipality of
Rome Capital and
the other actors
involved
N/A N/A N/A Q2 2022
The agreements shall be signed for the
6 projects: 1) Roman Cultural Heritage for EU-Next
Generation; 2) From Pagan Rome to
Christian Rome - Jubilee paths; 3)
#Lacittàcondivisa; 4) #Mitingodiverde; 5)
Roma 4.0; 6) #Amanotesa
The list of beneficiaries/implementing
bodies shall include: Rome Capital City;
Archaeological Superintendence for
Cultural, Environmental and Landscape
Heritage of Rome (MIC); Archaeological
Park of the Colosseum; Archaeological
Park of the Appia Antica; Diocese of
Rome; Ministry of Tourism; Region
Lazio.
Before the call for tenders the criteria for
the selection and the award and the
projects specificities shall be defined
167
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
with the related resources.
The award of the contracts to the
projects selected under the competitive
calls for proposals, shall be in
compliance with the ’Do no significant
harm’ Technical Guidance
(2021/C58/01) through the use of an
exclusion list and the requirement of
compliance with the relevant EU and
national environmental legislation.
M1C3-36
Investment - 4.3
Caput Mundi-Next
Generation EU for
touristic great
events
Target
Certificates of
completion of
works or services
N/A Number 0 200 Q2 2026
The certificates of completion of works
or services shall be issued for at least
200 interventions listed in the Caput
Mundi programme.
168
D. MISSION 2 COMPONENT 1: Circular economy, agri-food and green transition
This component of the Italian recovery and resilience plan covers investments and reforms in waste
management, circular economy, support for agri-food value chains and green transition. These
reforms and investments are complemented by reforms to increase competition in waste management
and local public services in the “business environment” reform component and improve water
consumption for agriculture. This component responds to the country-specific recommendations to
focus investment in the green transition, including in the circular economy. The investments and reforms under this component shall contribute addressing the country- specific
recommendations addressed to Italy in 2020 and 2019 on the need to “focus investment on the green
and digital transition, in particular on […] waste and water management” (CSR 3, 2020) and to “focus
investment-related economic policy on […], and the quality of infrastructure, considering also
regional disparities” (country- specific recommendation 3, 2019). It is expected that no measure in this component does significant harm to environmental objectives
within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description of
the measures and the mitigating steps set out in the recovery and resilience plan in accordance with
the DNSH Technical Guidance (2021/C58/01).
D.1. Description of the reforms and investments for non-repayable financial support
Circular Economy
Reform 1.1 – National Strategy for Circular Economy This reform consists in the adoption of a broad National Strategy for the Circular Economy covering a
new digital waste traceability system, tax incentives to support recycling activities and the use of
secondary raw materials, a revision of environmental taxation, the right to reuse and repair, the reform
of the EPR (Extended Producer Responsibility) and Consortia system, support for existing regulatory
tools (such as End of Waste legislation and Minimum Environmental Criteria under Green public
procurement) and support to industrial symbiosis project. The reform of the EPR and Consortia
system shall also address the need for a more efficient use of the environmental contribution to assure
the application of transparent and non-discriminatory criteria. A specific supervisory body with the
aim of monitoring the functioning and the effectiveness of the Consortia systems, under the
presidency of Ministry of Ecological Transition (MITE) shall be created. The measure shall address
all the Consortia (not only CONAI packaging system).
Reform 1.3 – Technical support for local authorities This reform consists in technical support to local authorities by the government for the
implementation of environmental EU and national regulation, the development of plans and projects
regarding waste management and on tendering procedures. The support on tendering procedures shall
ensure that concessions in waste management are granted in a transparent and non-discriminatory way
increasing competitive processes to achieve better standards for public services. This reform supports
therefore the implementation of the waste management reforms proposed in the business environment
reform component. Technical support shall also cover green public procurement.
Investment 2.1 – Logistics plan for the agri-food, fishing and aquaculture, forestry,
floriculture and plant nursery sectors The objective of this investment is to encourage the reduction of emissions in the transportation and
logistics phases in the agri-food sector, boosting the digitalization of the sector and the utilisation of
renewable energy. This measure consists in the granting of support to tangible and intangible
investments.
169
Investment 2.2 – Agri-solar Park The objective of this investment is to increase the sustainability and competitiveness of the
agricultural sector. This measure consists in the granting of support to investments on structures of the
agricultural, livestock and agro-industrial sector to install solar panels, as well as complementary
interventions.
Investment 2.3 – Innovation and mechanization in the agricultural and food sectors The objective of this investment is to drive innovation within the agricultural and food sectors. This
measure consists in the granting of support to investments in tangible and intangible assets.
Investment 3.3 - Culture and awareness on environmental topics and challenges This objective of this investment is the design and production of digital content to raise awareness of
environmental and climate challenges. The investment consists in the creation of an online
subscription-free platform to create a repository of educational and recreational materials on
environment-related topics.
170
D.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Sequential Number
Related Measure (Reform or
Investment)
Milestone / Target
Name Qualitative indicators
(for milestones)
Quantitative indicators (for targets)
Indicative timeline for completion Description of each milestone and
target Unit of measure
Baseline Goal Quarter Year
M2C1-1
Reform 1.1 - National Strategy
for Circular Economy
Milestone
Entry into force of the Ministerial Decree for
the adoption of the National Strategy for Circular Economy
Provision in the Ministerial Decree
indicating the entry into force
N/A N/A N/A Q2 2022
The Ministerial Decree for the adoption of the National Strategy for Circular Economy, shall contain at least the following measures:
• a new digital waste traceability system that shall support on one hand the development of secondary market for raw materials (by giving a clear framework of the supply of secondary raw materials) on the other hand the control authorities in preventing and tackling illegal management of waste.
• tax incentives to support the recycling activities and the use of secondary raw materials;
• a revision of environmental taxation system on waste in order to make recycling more convenient than landfilling and incineration across the national territory;
• right to reuse and repair;
• reform of the EPR (Extended Producer Responsibility) and Consortia system in order to support the achievement of EU targets through the
171
Sequential Number
Related Measure (Reform or
Investment)
Milestone / Target
Name Qualitative indicators
(for milestones)
Quantitative indicators (for targets)
Indicative timeline for completion Description of each milestone and
target Unit of measure
Baseline Goal Quarter Year
creation of a specific supervisory body, under the presidency of MITE, with the aim of monitoring the functioning and the effectiveness of the Consortia systems;
• support to the existing regulatory tools: End of Waste legislation (national and regional), Minimum Environmental Criteria (CAM) under Green Public Procurement. The development/update of EOW and CAM shall address specifically construction, textile, plastics, Waste Electrical and Electronic Equipment (WEEE)
• support to industrial symbiosis project through regulatory and financial instruments.)
M2C1-2
Reform 1.3 - Technical support
for Local Authorities
Milestone
Approval of agreement for the development of the Building capacity action plan to support
local public authorities
Publication of the approved agreement on
the website of the Ministry
N/A N/A N/A Q2 2022
The agreement for the development of the Building capacity action plan to support local public authorities in implementing inside the tender procedures the Minimum Environmental Criteria (CAM) set by Law (Legislative Decree n. 50/2016 on public tender) under the Green Public Procurement (GPP) and starting of the Support Action shall be approved.
172
Sequential Number
Related Measure (Reform or
Investment)
Milestone / Target
Name Qualitative indicators
(for milestones)
Quantitative indicators (for targets)
Indicative timeline for completion Description of each milestone and
target Unit of measure
Baseline Goal Quarter Year
Technical support to Local Authorities (Regions, Provinces, and Municipalities) shall be assured by the Government (Ministry for the Ecological Transition, Ministry for the Economic Development and other relevant) through the in house companies. The technical support shall cover the following:
• technical assistance for the implementation of environmental EU and national regulation;
• support for the development of plans and projects regarding waste management;
• support for tender procedures, also in order to ensure that concessions in waste management are granted in a transparent and non-discriminatory way increasing competitive processes to achieve better standards for public services.
The Ministry for the Ecological Transition shall develop a specific building capacity action plan in order to support local public authorities and professional public buyers in applying to tender procedures the Minimum
173
Sequential Number
Related Measure (Reform or
Investment)
Milestone / Target
Name Qualitative indicators
(for milestones)
Quantitative indicators (for targets)
Indicative timeline for completion Description of each milestone and
target Unit of measure
Baseline Goal Quarter Year
Environmental Criteria (CAM) set by Law (Legislative Decree n. 50/2016 on public tender) under the Green Public Procurement (GPP).
M2C1-3
Investment 2.1: Logistics plan for
the agri-food, fishing and
aquaculture, forestry, floriculture and plant nursery
sectors
Milestone
Publication of final ranking under the Logistic incentive
scheme
Publication on website of the Ministry or any
other support channel N/A N/A N/A Q4 2022
The Decree of approval shall define the final ranking. The logistic incentive scheme shall include the following: a) Eligibility criteria that ensure that the selected projects comply with the ‘Do no significant harm’ Technical Guidance (2021/C58/01) through the use of an exclusion list and the requirement of compliance with the relevant EU and national environmental legislation. b) Commitment that the climate contribution of the investment as per the methodology in Annex VI of the Regulation (EU) 2021/241 shall account for at least 32% of the total cost of the investment supported by the RRF. c) Commitment that the digital contribution of the investment as per the methodology in Annex VII of the Regulation (EU) 2021/241 shall account for at least 27% of the total cost of the investment supported by the RRF. d) Commitment to report on the implementation of the measure halfway through the life of the scheme and the end of the scheme.
174
Sequential Number
Related Measure (Reform or
Investment)
Milestone / Target
Name Qualitative indicators
(for milestones)
Quantitative indicators (for targets)
Indicative timeline for completion Description of each milestone and
target Unit of measure
Baseline Goal Quarter Year
M2C1-4 Investment 2.2: Agri-solar Park
Target
Allocation of resources to the beneficiaries as % of the total financial resources assigned to
the investment
N/A Percentage 0 30 Q4 2022
Identification of beneficiary projects whose total value amount at least 30% of the total financial resources assigned to the investment. The investment shall be implemented through two different procedures that already exist and shall be refinanced. These procedures provide for the disbursement of loans to companies that meet the requirements and submit the application.
M2C1-5 Investment 2.2: Agri-solar Park
Target
Allocation of resources to the beneficiaries as % of the total financial resources assigned to
the investment
N/A Percentage 19 32 Q4 2023
The beneficiary projects whose total value amount at least 32% of the total financial resources assigned to the investment shall be identified. The award procedure provides for the disbursement of grants or other incentives to companies that meet the requirements and submit the application.
M2C1-6 Investment 2.2: Agri-solar Park
Target
Allocation of resources to the beneficiaries as % of the total financial resources assigned to
the investment
N/A Percentage 32 63.5 Q2 2024
Identification of beneficiary projects whose total value amount at least 63.5% of the total financial resources assigned to the investment. The award procedure shall provide for the disbursement of grants or other incentives to companies that meet the requirements and submit the application
M2C1-6bis Investment 2.2: Agri-solar Park
Target
Allocation of resources to the beneficiaries as % of the total financial resources assigned to
the investment
N/A Percentage 63.5 100 Q4 2024
Identification of beneficiary projects whose total value amount at least 100% of the additional financial resources assigned to the investment. The award procedure provides for the
175
Sequential Number
Related Measure (Reform or
Investment)
Milestone / Target
Name Qualitative indicators
(for milestones)
Quantitative indicators (for targets)
Indicative timeline for completion Description of each milestone and
target Unit of measure
Baseline Goal Quarter Year
disbursement of grants or other incentives to companies that meet the requirements and submit the application
M2C1-7
Investment 2.3: Innovation and
mechanization in the agricultural and
food sectors
Target
Publication of final rankings with
identification of the final recipients.
N/A Number 0 10 000 Q4 2024
Identification of at least 10 000 final recipients for investment in innovation in the circular economy and bio- economy. The investments shall regard at least one of the following: - Replacement of more polluting off-road vehicles - Introduction of precision Farming and machinery for agriculture 4.0 - Replacement of more obsolete facilities for olive mills In order to comply with Do-No- Significant-Harm principle, off-road vehicles shall be zero-emission or run solely on biomethane, which shall comply with the criteria set out in Directive 2018/2001 (RED II Directive). Biofuel and biomethane gas and biofuel producers shall have to provide certificates (Proof of Sustainability) issued by independent evaluators, as provided for in Directive 2018/2001. The operator shall purchase guarantee of origin certificates commensurate to the expected fuel use.
176
Sequential Number
Related Measure (Reform or
Investment)
Milestone / Target
Name Qualitative indicators
(for milestones)
Quantitative indicators (for targets)
Indicative timeline for completion Description of each milestone and
target Unit of measure
Baseline Goal Quarter Year
M2C1-8
Investment 2.3: Innovation and
mechanization in the agricultural and
food sectors
Target Projects carried out N/A Number 0 9608 Q2 2026
Administrative act(s) confirming that at least 9608 projects in one or more of the following areas have been carried out: - Replacement of more polluting off- road vehicles - Introduction of precision farming, including innovation in irrigation systems and water management - Replacement of more obsolete facilities for olive mills. In order to comply with Do-No- Significant-Harm principle, off-road vehicles shall be zero-emission or run solely on biomethane, which shall comply with the criteria set out in Directive 2018/2001 (RED II Directive) Biofuel and biomethane gas and biofuel producers shall have to provide certificates (Proof of Sustainability) issued by independent evaluators, as provided for in Directive 2018/2001. The operator shall purchase guarantee of origin certificates commensurate to the expected fuel use.
M2C1-9 Investment 2.2: Agri-solar Park
Target Solar power
generation capacity installed
N/A kW 0 1 470 000 Q2 2026 At least 1 470 000 kW of solar power generation capacity installed.
M2C1-11
Investment 3.3: Culture and
awareness on environmental
topics and challenges
Milestone Launch of web
platform and contracts with authors
Notification of signature of contract with content
producers N/A N/A N/A Q2 2022
Public launch of the web platform and final agreements signature with "content producers". The projects aim at the development of at least 180 podcasts, school-specific video lessons and video contents produced and
177
Sequential Number
Related Measure (Reform or
Investment)
Milestone / Target
Name Qualitative indicators
(for milestones)
Quantitative indicators (for targets)
Indicative timeline for completion Description of each milestone and
target Unit of measure
Baseline Goal Quarter Year
available on the web platform on the environmental transition.
M2C1-12
Investment 3.3: Culture and
awareness on environmental
topics and challenges
Target Podcasts on
environmental transition
N/A Number 0 180 Q2 2025 At least 180 podcasts published on the web platform.
178
D.3. Description of the reforms and investments for the loan
Reform 1.2 – National Programme for Waste Management This reform consists in the adoption of a broad National Programme for Waste Management aiming the
highest levels of preparation for reuse, recycling and recovery of waste, adapting the network of installations
necessary for integrated waste management, minimizing final disposal as the ultimate and residual option,
establishing monitoring systems, preventing the opening of new infringement procedures against Italy,
tackling low collection of waste, discouraging landfilling and ensuring complementarity with regional waste
programmes, enabling the achievement of European and national waste legislation objectives and tackling
illegal waste dumping and open-air burning.
Investment 1.1 – Implementation of new waste management plants and modernization of
existing plants and circular economy ‘’flagship projects’’ This objective of this investment is to improve waste management and support the circular economy. The
investment consists of financing projects to build new treatment/recycling plants or modernize existing ones
as well as to support and digitalize separate collection for different waste streams.
Investment 2.1 – Logistics plan for the agri-food, fishing and aquaculture, forestry,
floriculture and plant nursery sectors The objective of this investment is to encourage the reduction of emissions in the transportation and logistics
phases in the agri-food sector, boosting the digitalization of the sector and the utilisation of renewable
energy. This measure consists in the granting of support to tangible and intangible investments.
Investment 3.1 - Green islands
The objective of this measure is to support the green transition in 19 non-interconnected Small Islands in
Italy. This investment consists in financing and implementing projects in energy (which may include, but is
not limited to renewables, grid or energy efficiency), water (which may include, but is not limited to
desalination), transport (which may include, but is not limited to cycling paths, zero-emission buses or boats)
and waste (which may include, but is not limited to separation of waste) in the 19 Small Islands.
Investment 3.2 - Green communities
The objective of this investment is to support the green transition in rural and mountain territories (so-called
“Green Communities”). This investment consists in supporting projects in the “Green Communities”.
Investment 3.4 – Fondo Rotativo Contratti di Filiera (FCF) to support supply-chains
contracts for the agri-food, fishing and aquaculture, forestry, floriculture and plant nursery
sectors This measure shall consist of a public investment in a Facility, the Fondo Rotativo Contratti di Filiera (FCF),
in order to incentivise private investment and improve access to finance in Italy’s the agri-food, fishing and
aquaculture, forestry, floriculture and plant nursery sectors. The Facility shall operate by providing grants
and subsidised loans directly through ISMEA (Istituto di Servizi per il Mercato Agricolo Alimentare). The Facility shall be managed by ISMEA as the implementing partner. The Facility shall include the
following product lines: • Support enterprises, groups of enterprises or agricultural producer associations as well as
research and knowledge-dissemination organisations, in the agri-food, fishing and aquaculture,
forestry, floriculture and plant nursery sectors by improving production processes by including a
mix of activities amongst the following:
o Improve the environmental sustainability of production processes with investments
in tangible and intangible assets to substantially increase the efficiency in energy, water
and resources consumption of the targeted production processes;
o Investments in knowledge, training, research and innovation, technology transfer and
development projects, which may also support the reorganisation of relations between
179
the various actors in the supply chain, to enhance the sustainability of production
processes;
o Investments in the digitalisation of enterprises, including e-commerce and emerging
technologies;
o Installation of photovoltaic and solar panels
The objective of the measure is to reduce greenhouse gas emissions, food waste and the use of pesticides and
antimicrobials, improving energy efficiency and increasing the production and use of renewable energy. In order to implement the investment into the Facility, the Ministry and ISMEA shall sign an Implementing
Agreement that shall include the following content: 1. Description of the decision-making process of the Facility: The final investment decision of
the Facility shall be taken by an investment committee or other relevant equivalent governing
body and approved by a majority of votes from members who are independent from the
government.
2. Key requirements of the associated investment policy, which shall include:
a. The description of the financial product(s) and eligible final beneficiaries.
b. The requirement that all investments supported are economically viable.
c. The requirement to comply with the ‘Do no significant harm’ (DNSH) principle as
set out in the DNSH Technical Guidance (2021/C58/01). In particular, the investment
policy shall exclude the following list of activities and assets from eligibility: (i)
activities and assets related to fossil fuels, including downstream use21, (ii) activities and
assets under the EU Emission Trading System (ETS) achieving projected greenhouse
gas emissions that are not lower than the relevant benchmarks22, (iii) activities and assets
related to waste landfills, incinerators23 and mechanical biological treatment plants24.
d. The requirement that final beneficiaries of the Facility shall not receive support from
other Union instruments to cover the same cost.
3. The amount covered by the Implementing Agreement, the fee structure for the Implementing
Partner and the requirement to reinvest any reflows according to the investment policy of the
Facility.
4. Monitoring, audit, and control requirements, including:
a. The description of the implementing partner’s monitoring system to report on the
investment mobilized.
b. The description of the implementing partner’s procedures that shall ensure the
prevention, detection and correction of fraud, corruption, and conflicts of interests.
c. The obligation to verify the eligibility of every operation in accordance with the
requirements laid out in the Implementing Agreement before committing to finance an
operation.
21 Except for (a) assets and activities in power and/or heat generation, as well as related transmission and distribution
infrastructure, using natural gas, that are compliant with the conditions set out in Annex III of the ‘Do no significant
harm’ Technical Guidance (2021/C58/01) and (b) activities and assets under point (ii) for which the use of fossil fuels is
temporary and technically unavoidable for the timely transition towards a fossil fuel free operation. 22 Where the activity supported achieves projected greenhouse gas emissions that are not significantly lower than the
relevant benchmarks, an explanation of the reasons why this is not possible shall be provided. Benchmarks established
for free allocation for activities falling within the scope of the Emissions Trading System, as set out in the Commission
Implementing Regulation (EU) 2021/447. 23 This exclusion does not apply to actions under this measure in plants exclusively dedicated to treating non-recyclable
hazardous waste, and to existing plants, where the actions under this measure are for the purpose of increasing energy
efficiency, capturing exhaust gases for storage or use or recovering materials from incineration ashes, provided such
actions under this measure do not result in an increase of the plants’ waste processing capacity or in an extension of the
lifetime of the plants; for which evidence is provided at plant level. 24 This exclusion does not apply to actions under this measure in existing mechanical biological treatment plants, where
the actions under this measure are for the purpose of increasing energy efficiency or retrofitting to recycling operations
of separated waste to compost bio-waste and anaerobic digestion of bio-waste, provided such actions under this measure
do not result in an increase of the plants’ waste processing capacity or in an extension of the lifetime of the plants; for
which evidence is provided at plant level.
180
d. The obligation of carrying out risk-based ex-post audits in accordance with an audit
plan of ISMEA. These audits shall verify i) that the control systems are effective,
including the detection of fraud, corruption, and conflict of interests; ii) compliance with
the DNSH principle, the State Aid rules, the climate and digital target requirements in
accordance with Annex VI to the RRF Regulation and with Annex VII to the RRF
Regulation; and iii) that the requirement that final beneficiaries of the Facility have not
received support from other Union instruments to cover the same cost is respected. The
audits shall also verify the legality of the transactions and that the conditions of the
applicable Implementing Agreement and Funding Agreements are being respected.
5. Requirements for climate investments carried out by the implementing partner: at least
EUR 1 848 000 000.00 of the RRF investment into the Facility shall contribute to the climate
change objectives in accordance with Annex VI to the RRF Regulation.25
Investment 4 - Agri-Solar Park Facility This measure shall consist of a public investment in a Grant Scheme, the Agri-Solar Park Facility, in order to
incentivise private investment and improve access to finance in Italy’s agro-industrial sector. The Scheme
shall operate by providing grants directly to the private sector. The Scheme shall be managed by Gestore Servizi Energetici S.p.A. (GSE) as the implementing partner. The
scheme shall support investments in structures of the agricultural, livestock and agro-industrial sector, to
install solar panels, as well as complementary interventions. Membership of the “rete del lavoro agricolo di
qualità” network will be positively considered in the assessment of project proposals. In order to implement the investment into the Scheme, Italy and GSE shall sign an Implementing Agreement
that shall include the following content: 1. Description of the decision-making process of the Scheme: The final award decision of the
Scheme shall be taken by an investment committee or other relevant equivalent governing body and
approved by a majority of votes from members who are independent from the government.
2. Key requirements of the associated grant policy,which shall include:
a. The description of the grants provided and eligible final beneficiaries.
b. The requirement that all investments supported are economically viable.
c. The requirement to comply with the ‘Do no significant harm’ (DNSH) principle as set out in
the DNSH Technical Guidance (2021/C58/01). In particular, the grant policy shall exclude the
following list of activities and assets from eligibility: (i) activities and assets related to fossil
fuels, including downstream use26, (ii) activities and assets under the EU Emission Trading
System (ETS) achieving projected greenhouse gas emissions that are not lower than the
relevant benchmarks27, (iii) activities and assets related to waste landfills, incinerators28 and
mechanical biological treatment plants29.
25 Final beneficiaries associated to specific projects shall be required to provide a justification of the selected
intervention field for each project supported, together with a description of the project, for the purpose of the
computation of the climate contribution. For the purpose of the computation of the climate contribution, final
beneficiaries from equity, quasi-equity, corporate bonds or equivalent instruments not targeted to specific projects shall
provide a justification for the selected intervention field(s). The implementing partner shall also be required to provide
to the Member State a semi-annual report on the implementation of each project/activity. 26 Except for (a) assets and activities in power and/or heat generation, as well as related transmission and distribution
infrastructure, using natural gas, that are compliant with the conditions set out in Annex III of the ‘Do no significant
harm’ Technical Guidance (2021/C58/01) and (b) activities and assets under point (ii) for which the use of fossil fuels is
temporary and technically unavoidable for the timely transition towards a fossil fuel free operation. 27 Where the activity supported achieves projected greenhouse gas emissions that are not significantly lower than the
relevant benchmarks, an explanation of the reasons why this is not possible shall be provided. Benchmarks established
for free allocation for activities falling within the scope of the Emissions Trading System, as set out in the Commission
Implementing Regulation (EU) 2021/447. 28 This exclusion does not apply to actions under this measure in plants exclusively dedicated to treating non-recyclable
hazardous waste, and to existing plants, where the actions under this measure are for the purpose of increasing energy
efficiency, capturing exhaust gases for storage or use or recovering materials from incineration ashes, provided such
181
d. The requirement that final beneficiaries of the Scheme shall not receive support from other
Union instruments to cover the same cost.
3. The amount covered by the Implementing Agreement, the fee structure for the Implementing
Partner and the requirement to use any unused proceeds of the scheme, including beyond 2026, for
the same policy purposes.
4. Monitoring, audit, and control requirements, including:
1. The description of the implementing partner’s monitoring system to report on the
grants mobilized.
2. The description of the implementing partner’s procedures that will ensure the
prevention, detection and correction of fraud, corruption, and conflicts of interests.
3. The obligation to verify the eligibility of every operation in accordance with the
requirements laid out in the Implementing Agreement before awarding a grant to an
operation.
4. The obligation of carrying out risk-based ex-post audits in accordance with an audit
plan of the GSE. These audits shall verify i) that the control systems are effective,
including the detection of fraud, corruption, and conflict of interests; ii) compliance with
the DNSH principle, the State Aid rules, the climate target requirements; and iii) that the
requirement that final beneficiaries of the Scheme have not received support from other
Union instruments to cover the same cost is respected. The audits shall also verify the
legality of the transactions and that the conditions of the applicable Implementing
Agreement Grant Agreements are being respected.
5. Requirements for climate investments carried out by the implementing partner: at least
EUR 633 000 000 of the RRF investment into the Scheme shall contribute to the climate change
objectives in accordance with Annex VI to the RRF Regulation30.
actions under this measure do not result in an increase of the plants’ waste processing capacity or in an extension of the
lifetime of the plants; for which evidence is provided at plant level. 29 This exclusion does not apply to actions under this measure in existing mechanical biological treatment plants, where
the actions under this measure are for the purpose of increasing energy efficiency or retrofitting to recycling operations
of separated waste to compost bio-waste and anaerobic digestion of bio-waste, provided such actions under this measure
do not result in an increase of the plants’ waste processing capacity or in an extension of the lifetime of the plants; for
which evidence is provided at plant level. 30 Final beneficiaries associated to specific projects shall be required to provide a justification of the selected
intervention field for each project supported, together with a description of the project, for the purpose of the
computation of the climate contribution. For the purpose of the computation of the climate contribution, final
beneficiaries from equity, quasi-equity, corporate bonds or equivalent instruments not targeted to specific projects shall
provide a justification for the selected intervention field(s). The implementing partner shall also be required to provide
to the Member State a semi-annual report on the implementation of each project/activity.
182
D.4. Milestones, targets, indicators, and timetable for monitoring and implementation for the loan
Sequential Number
Related Measure (Reform or
Investment)
Milestone / Target
Name Qualitative indicators
(for milestones)
Quantitative indicators (for targets)
Indicative timeline for completion Description of each milestone and target
Unit of measure
Baseline Goal Quarter Year
M2C1-13
Reform 1.2 - National Program
for Waste Management
Milestone
Entry into force the Ministerial Decree for the National Program
for Waste Management
Provision in the law indicating the entry
into force N/A N/A N/A Q2 2022
The Ministerial Decree for the National Program for Waste Management shall include at least the following objectives: to achieve the highest levels of preparing for reuse, recycling and recovery of waste, achieving at least the objectives set out in art. 181 of Legislative Decree 152/06 and also taking into account the extended producer responsibility schemes;
i.to adapt the network of installations necessary for integrated waste management - with a view to developing the circular economy - ensuring the necessary capacities to achieve the objectives set out in point a) and, consequently, minimizing final disposal as the ultimate and residual option, in accordance with the proximity principle and taking into account the prevention objectives defined in the context of the national waste prevention planning provided by art. 180 of Legislative Decree 152/06;
ii.to establish an adequate monitoring of the implementation of the Program to allow the constant verification of compliance with its objectives and the eventual necessity to adopt corrective tools for the achievement of the planned actions;
iii.to prevent the opening of new
183
Sequential Number
Related Measure (Reform or
Investment)
Milestone / Target
Name Qualitative indicators
(for milestones)
Quantitative indicators (for targets)
Indicative timeline for completion Description of each milestone and target
Unit of measure
Baseline Goal Quarter Year
infringement procedures against the Republic of Italy for failure to implement European regulations on waste cycle planning;
iv.to tackle low collection of waste and to discourage landfilling (see also National Strategy on Circular Economy);
v.the regional waste management plant shall be complementary to the national programme for waste management;
vi.to bridge the waste management gaps and regional divide, regarding installations capacity and quality standards existing between the different regions and areas of the national territory, with the objective to recover delays;
vii.to achieve the current and new objectives provided for by European and national legislation;
viii.to tackle illegal waste dumping and open- air burning (e.g. in Terra dei Fuochi area) through measures, included the introduction of a new Waste traceability system, supported Global Monitoring System to face illegal dumping shall be developed using satellites, drones ad artificial intelligence (AI) technologies
M2C1-14 Investment 1.1 -
Implementation of new waste
Milestone Entry into force of the Ministerial Decree.
Adoption of the Ministerial Decree for
the approval of the
Publication in the Gazzetta
Ufficiale N/A N/A Q3 2021
The Ministerial Decree of approval of criteria for the selection of projects proposed by Municipalities shall enter into force.
184
Sequential Number
Related Measure (Reform or
Investment)
Milestone / Target
Name Qualitative indicators
(for milestones)
Quantitative indicators (for targets)
Indicative timeline for completion Description of each milestone and target
Unit of measure
Baseline Goal Quarter Year
management plants and
modernization of existing plants; Investment 1.2 -
Circular economy “flagship” projects
selection criteria of the projects proposed by
Municipalities.
The Ministerial Decree shall lay down that the projects are selected among the following criteria:
• Coherence with EU and national legislation and European Action Plan on Circular Economy,
• Expected improvement of recycle objectives
• Consistency with regional and national planning instruments,
• Contribution to solving EU infringements, synergies with other sectorial planning (e.g. PNIEC) and/or other components of the plan, innovative technologies basing on full-scale experiences,
• Technical quality of the proposal.
• Consistency and complementarity with cohesion policy programmes and similar projects funded through other EU and national instruments
The interventions shall not include investments in landfills, disposal facilities, Mechanical Biological Treatment /Mechanical Treatment plants or incinerators, in compliance with the DNSH principle.
M2C1-15
Reform 1.2 National Program
for Waste Management
Target Reduction of irregular
landfills (T1) N/A Number 33 11 Q2 2024
Reduction of irregular landfills included in the infringement procedure NIF 2003/2077 from 33 to 11 (i.e. of at least 66%).
185
Sequential Number
Related Measure (Reform or
Investment)
Milestone / Target
Name Qualitative indicators
(for milestones)
Quantitative indicators (for targets)
Indicative timeline for completion Description of each milestone and target
Unit of measure
Baseline Goal Quarter Year
M2C1-15bis
Reform 1.2 National Program
for Waste Management:
Target Reduction of irregular
landfills (T2) N/A Number 34 14 Q4 2023
Reduction of irregular landfills included in the infringement procedure 2011/2215 from 34 to 14 (i.e. of at least 60%).
M2C1-15ter
Investment 1.1 - Implementation of
new waste management
plants and modernization of existing plants
Target Reduction of regional
differences in separate collection
N/A Percentage
points 22.8 20 Q4 2023
The difference between the national average and the worst performing region in separate collection rates is reduced to 20 percentage points.
M2C1-15 quater
Investment 1.1 - Implementation of
new waste management
plants and modernization of existing plants
Milestone Entry into force of Bio-
waste separate collection obligation
Provision in the law indicating the entry
into force N/A N/A N/A Q4 2023
The bio-waste separate collection obligation is operational by 31 December 2023, in accordance with EU Circular Economy Action Plan
M2C1-16
Reform 1.2 National Program
for Waste Management
Target Irregular landfills N/A Number 11 0 Q2 2026 Reduction of irregular landfills included in the infringement procedure 2003/2077 from 11 to 0.
M2C1-16bis
Reform 1.2 National Program
for Waste Management
Target Irregular landfills N/A Number 14 9 Q2 2024 Reduction of irregular landfills included in the infringement procedure 2011/2215 from 14 to 9 (i.e. at least 75%)
M2C1-16ter
Investment 1.1 -
Implementation of new waste
management
Target Regional differences in
separate collection rates
N/A Percentage
points 28,4 20 Q4 2024
The difference in separate waste collections between the average of the three best-performing regions (Veneto, Trentino, Sardegna) and the average of the worst-performing regions (Basilicata, Calabria and Sicilia) indicated in the
186
Sequential Number
Related Measure (Reform or
Investment)
Milestone / Target
Name Qualitative indicators
(for milestones)
Quantitative indicators (for targets)
Indicative timeline for completion Description of each milestone and target
Unit of measure
Baseline Goal Quarter Year
plants and modernization of existing plants
2020 ISPRA report is reduced to 20 percentage points. The satisfactory fulfilment of the target also requires the national average and the average of the three best-performing regions indicated in the 2020 ISPRA report (Veneto, Trentino, Sardegna) in terms of separate waste collection to increase compared to the data included in the 2020 ISPRA report
M2C1-16quater
Investment 1.1 - Implementation of
new waste management
plants and modernization of
existing plants and circular economy
‘’flagship’’ projects
Target Projects carried out N/A Number 0 584 Q2 2026 At least 584 projects have been carried out, of which at least 90 shall concern projects for waste plants.
M2C1-10
Investment 2.1: Logistics plan for
the agri-food, fishing and
aquaculture, forestry, floriculture and plant nursery
sectors
Target
Tangible and intangible investments
in agri-food, fishing and aquaculture,
forestry, floriculture and plant nursery
sectors.
N/A Number 0 72 Q2 2026
At least 72 tangible and intangible investments in the agri-food, fishing and aquaculture, forestry, floriculture and plant nursery sectors have been carried out.
M2C1-18 Investment 3.1: Green islands
Milestone Entry into force of the
Directorial decree
Provision in the Decree indicating the entry into force of the
law
N/A N/A N/A Q3 2022
The Directorial decree shall approve the ranking of projects relating to the results of the public notice. The selection procedure shall include the following:
187
Sequential Number
Related Measure (Reform or
Investment)
Milestone / Target
Name Qualitative indicators
(for milestones)
Quantitative indicators (for targets)
Indicative timeline for completion Description of each milestone and target
Unit of measure
Baseline Goal Quarter Year
a) Eligibility criteria that ensure that the selected projects comply with the ‘Do no significant harm’ Technical Guidance (2021/C58/01) through the use of an exclusion list and the requirement of compliance with the relevant EU and national environmental legislation. b) Commitment that the climate contribution of the investment as per the methodology in Annex VI of the Regulation (EU) 2021/241 shall account for at least 37% of the total cost of the investment supported by the RRF. c) Commitment to report on the implementation of the measure halfway through the life of the scheme and the end of the scheme. The possible areas of interventions are: • the integrated and certified management of the agro-forestry heritage ("also through the exchange of credits deriving from the capture of carbon dioxide, the management of biodiversity and the certification of the wood supply chain");
• the integrated and certified management of water resources;
• the production of energy from local renewable sources, such as micro hydroelectric plants, biomass, biogas, wind, cogeneration and bio-methane;
• the development of sustainable tourism ("capable of enhancing local products");
• the construction and sustainable management of the building stock and infrastructure of a modern mountain;
188
Sequential Number
Related Measure (Reform or
Investment)
Milestone / Target
Name Qualitative indicators
(for milestones)
Quantitative indicators (for targets)
Indicative timeline for completion Description of each milestone and target
Unit of measure
Baseline Goal Quarter Year
• energy efficiency and intelligent integration of plants and networks;
• the sustainable development of production activities (zero waste production);
• the integration of mobility services;
• the development of a sustainable farm model ("which is also energy independent through the production and use of energy from renewable sources in the electrical, thermal and transport sectors").
The bio-methane shall comply with the sustainability and greenhouse gas emission savings criteria set out in Articles 29-31 and the rules on food and feed based biofuels set out in Article 26 of the Renewable Energy Directive 2018/2001/EU (REDII), and related implementing and delegated acts in order to allow the measure to comply with Do-No-Significant-Harm principle and with the relevant requirements of footnote 8 of Annex VI of the Regulation (EU) 2021/241
M2C1-19 Investment 3.1: Green islands
Target Administrative act(s) for interventions in
small islands N/A
Number of projects
0 57 Q2 2026
Administrative act(s) are issued confirming that interventions are carried out under each of the 57 projects in 19 small islands, involving at least one project per island. The eligible projects are: • energy efficiency;
• creating and/or upgrading collective mobility services and charging infrastructures; buses and boats powered by electricity; shelters for public transport services; car sharing, bike sharing, scooter sharing;
• construction and/or adaptation of cycle routes,
189
Sequential Number
Related Measure (Reform or
Investment)
Milestone / Target
Name Qualitative indicators
(for milestones)
Quantitative indicators (for targets)
Indicative timeline for completion Description of each milestone and target
Unit of measure
Baseline Goal Quarter Year
construction of sheltering areas;
• separate collection with enhancement of collection systems;
• construction/modernisation of ecological islands with associated re-use centre;
• desalination systems;
• water efficiency, which may include, but are not limited to the construction of new drinking water treatment systems;
• renewable energies plants for the electricity, which may include, but are not limited to photovoltaic, wind offshore or marine renewable energy (for example, wave or tidal power);
• energy efficiency measures aimed at reducing electricity demand;
• projects on the electricity grid and related infrastructures, which may include, but are not limited to storage devices, integration of the electricity system with the island's water system, smart grids, innovative energy management or monitoring systems.
M2C1-20 Investment 3.2:
Green Communities
Milestone
Award of (all) public contracts for the
selection of Green Communities
Notification of the award of (all) public
contracts for the selection of Green
Communities
N/A N/A N/A Q3 2022
Notification of the awarding procedure for the grants, which should include eligibility criteria that ensure that the selected projects comply with the ‘Do no significant harm’ Technical Guidance (2021/C58/01) through the use of an exclusion list and the requirement of compliance with the relevant EU and national environmental legislation.
190
Sequential Number
Related Measure (Reform or
Investment)
Milestone / Target
Name Qualitative indicators
(for milestones)
Quantitative indicators (for targets)
Indicative timeline for completion Description of each milestone and target
Unit of measure
Baseline Goal Quarter Year
M2C1-21 Investment 3.2:
Green Communities
Target
Administrative certificates on the
finalisation of projects in the Green Communities
N/A Number of
projects 0 410 Q2 2026
Administrative certificates confirming that at least 410 projects in the Green Communities have been carried out. Projects shall be in at least one of the following fields: • the integrated and certified management
of the agro-forestry heritage;
• the integrated and certified management of water resources;
• the production of energy from local renewable sources, such as micro hydroelectric plants, biomass, biogas, wind, cogeneration and biomethane;
• the development of sustainable tourism;
• the construction and sustainable management of the building stock and infrastructure of a modern mountain;
• energy efficiency and intelligent integration of plants and networks;
• the sustainable development of production activities (zero waste production);
• the integration of mobility services;
• the development of a sustainable farm model.
M2C1-22
Investment 3.4: Fondo Contratti di
Filiera (FCF) to support supply- chains contracts for the agri-food,
Milestone Implementing Agreement
Entry into force of the Implementing Agreement
N/A N/A N/A Q2 2024 Entry into force of the Implementing Agreement.
191
Sequential Number
Related Measure (Reform or
Investment)
Milestone / Target
Name Qualitative indicators
(for milestones)
Quantitative indicators (for targets)
Indicative timeline for completion Description of each milestone and target
Unit of measure
Baseline Goal Quarter Year
fishing and aquaculture,
forestry, floriculture and plant nursery
sectors
M2C1-23
Investment 3.4: Fondo Contratti di
Filiera (FCF) to support supply- chains contracts for the agri-food,
fishing and aquaculture,
forestry, floriculture and plant nursery
sectors
Milestone
Resources transferred to ISMEA and
amendment of the implementing agreement
Certificate of transfer and amendment of the
implementing agreement
N/A N/A N/A Q4 2025
Italy shall transfer additional EUR 2 000 000 000.00 to ISMEA for the Facility. Amendment of the total funding and management fee of the implementing agreement.
M2C1-24
Investment 3.4: Fondo Contratti di
Filiera (FCF) to support supply- chains contracts for the agri-food,
fishing and aquaculture,
forestry, floriculture and plant nursery
sectors
Target Legal agreements with
final beneficiaries N/A Percentage 0 100 Q2 2026
ISMEA shall have entered into legal financing agreements with final beneficiaries for an amount necessary to use 100% of the RRF investment into the Facility (taking into account management fees). ISMEA shall produce a report detailing the percentage of this financing that contributes to climate objectives using the methodology in Annex VI.
M2C1-25
Investment 3.4: Fondo Contratti di
Filiera (FCF) to support supply-
Milestone Ministry has
transferred the overall amount of resources
Certificate of transfer N/A N/A N/A Q4 2024 Italy shall transfer EUR 1 960 000 000.00 to ISMEA for the Facility.
192
Sequential Number
Related Measure (Reform or
Investment)
Milestone / Target
Name Qualitative indicators
(for milestones)
Quantitative indicators (for targets)
Indicative timeline for completion Description of each milestone and target
Unit of measure
Baseline Goal Quarter Year
chains contracts for the agri-food,
fishing and aquaculture,
forestry, floriculture and plant nursery
sectors
M2C1-26 Investment 4: Agri- Solar Park Facility
Milestone Implementing
Agreement
Entry into force of the Implementing
Agreement N/A N/A N/A Q4 2025 Entry into force of the Implementing Agreement.
M2C1-27 Investment 4: Agri- Solar Park Facility
Milestone
Legal agreements signed with final beneficiaries and
investment completion
Legal agreements signed and certificate
of transfer N/A N/A N/A Q2 2026
GSE shall have entered into legal grant agreements with final beneficiaries for an amount necessary to use 100% of the RRF investment into the Scheme (taking into account management fees). At least 633 000 000 of this financing shall contribute to climate objectives using the methodology in Annex VI of the RRF Regulation. Italy shall transfer EUR 789 000 000 to the GSE for the Facility.
193
E. MISSION 2 COMPONENT 2: Energy transition and sustainable mobility
This component of the Italian recovery and resilience plan covers investments and reforms in energy
transition. It includes reforms to facilitate the permitting of projects of renewable energy sources. The
component contains investments in renewables supply chain, hydrogen power, bio-methane facilities
and smart grids. These reforms and investments are complemented by reforms to increase competition
in the electricity market in the “business environment” reform component.
This component also covers investments and reforms in sustainable mobility. It includes reforms to
facilitate the permitting of projects of sustainable mobility. The component contains investments to
build cycling paths and metro/tram/bus rapid transit infrastructures and to procure zero-emission
buses, rolling stock, firefighting and airport vehicles. These reforms and investments are
complemented by reforms to remove regulated prices for electric charging and increase competition in
charging point concessions, regional railways and local public transport in the “business environment”
reform component.
The investments and reforms under this component shall contribute addressing the country- specific
recommendations addressed to Italy in 2020 and 2019 on the need to “focus investment on the green
and digital transition, in particular on […] clean and efficient production and use of energy […]
sustainable public transport” (CSR 3, 2020) and to “focus investment-related economic policy on
[…], and the quality of infrastructure, considering also regional disparities” (country- specific
recommendation 3, 2019).
The component supports the guidelines issued to Italy on the implementation of its National Energy
and Climate Plan (SWD(2020) 911 final), that were inviting Italy to promoting, revamping and
repowering existing renewable installations, in particular existing wind power plants and to explore
innovative offshore energy across the Mediterranean.
It is expected that no measure in this component does significant harm to environmental objectives
within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description of
the measures and the mitigating steps set out in the recovery and resilience plan in accordance with
the DNSH Technical Guidance (2021/C58/01).
E.1. Description of the reforms and investments for non-repayable
financial support
Reform 1 - Simplification of authorization procedures for renewable onshore and offshore
plants and new legal framework to sustain the production from renewable sources and time and
eligibility extension of the current support schemes
This reform consists in:
- the entry into force of simplification measures for renewable energy source installations and the
repowering and revamping of existing plants, in coherence with the provisions of Decree law
No. 76 of 17 July 2020 ‘’the Simplifications Decree’’;
- the enactment of a decree, agreed with the Regions and the other State Administrations concerned,
aimed at defining criteria for the identification of the areas suitable and not suitable for the
installation of renewable energy plants for an additional renewable energy production capacity of
at least 73 GW, in coherence with the updated version of the PNIEC, for the achievement of the
objectives of development of renewable sources;
- the completion of the RES support mechanism also for additional non-mature or with high
operating cost technologies and the extension of the auction run period for the so called RES1
mechanism, while maintaining the principle of competitive access;
194
- provisions to promote investment in storage systems, in the legislative decree transposing
Directive (EU) 2019/944 on common rules for the internal market in electricity.
Reform 2- New legislation to promote renewable gas production and consumption
This reform consists in reinforcing support for clean bio-methane by adopting legislation to increase
the scope of bio-methane projects eligible for support and extend the period of time for the
availability of grants. The biomethane shall comply with criteria set out in Renewable Energy
Directive 2018/2001/EU (REDII) in order to allow the measure to comply with Do-No-Significant-
Harm principle and with the relevant requirements of footnote 8 of Annex VI of the Regulation (EU)
2021/241.
Reform 3 - Administrative simplification and reduction of regulatory barriers to hydrogen
deployment
This reform consists in the entry into force of a legislative framework to promote hydrogen as a
renewable source of energy. This legislative framework shall contain:
- Technical safety regulations on production, transport, (technical and regulatory criteria for the
introduction of hydrogen into the natural gas network), storage and use of hydrogen;
- A fast-track authorization procedure with a one stop shop procedure to obtain the authorisation to
build and operate a small scale hydrogen production plant (for electrolyser facilities of less than
1-5 MW; the storage threshold shall be defined in the aforementioned technical safety regulations
of hydrogen).
- Regulation of the participation of hydrogen production plants in network services. The Energy
Regulator (ARERA) shall be tasked to issue a specific regulatory measure upon consultation of
the stakeholders.
- A system of guarantees of origin for renewable hydrogen in order to give price signals to
consumers.
- Procedures and/or criteria to define the selected refuelling areas along the motorways for the
optimisation of the location of the refuelling stations to create H2 corridors for trucks, starting
from the Northern Italian Regions as far as the Po Valley and logistic hubs and the main highways
along the peninsula.
- The coordination of the 10-year Development plan of the national Transmission System Operator
(TSO) with the plans of other European TSOs aimed at the development of common standards for
hydrogen transport by means of existing gas pipelines or dedicated pipelines.
Reform 4 - Measures to promote hydrogen competitiveness
This reform consists in adopting tax measures to incentivise the production and/or utilisation of
hydrogen, in line with EU rules about taxation, and transposing RED II Directive. This measure shall
support hydrogen production based on electrolysis using renewable energy sources as defined in the
Directive (EU) 2018/2001 (renewable Directive) or grid electricity.
Reform 5 - Smarter procedures for project evaluation in the local public transport systems
sector with fixed installations and in the rapid mass transport sector
This reform consists in adopting a legislation assigning clearly responsibilities in the approval of local
public transport projects and a simplification of the payment procedure.
Investment 2.1 - Strengthening smart grids
The objective of this investment is the infrastructural upgrade and digitalisation of the electricity
distribution grid. The investment consists in providing grants to grid operators to finance interventions
195
that increase the hosting capacity of the grid as well as the maximum power delivered for
consumption by the grid to households.
Investment 2.2 - Interventions to increase the resilience of the power grid
The objective of this investment is to increase the resilience of the transmission and distribution grid
to extreme weather events, hence reducing the probability of prolonged interruptions of electricity
supply. The investment consists in providing grants to grid operators for interventions corresponding
to increased resilience of the grid.
Investment 4.1 - Investment in soft mobility (National Plan of Cycle Path)
The objective of this investment is to build cycle paths to facilitate commuting between locations in
metropolitan areas or cities hosting universities, and touristic cycle paths mainly in rural areas. This
investment consists in building at least 1 261 km of cycling lanes in metropolitan areas and of tourist
cycle paths.
Investment 4.3 – Installation of charging infrastructures
The objective of this investment is to support the decarbonisation of the transport sector. This
investment consists in financing the installation of charging infrastructure points on freeways or in
urban areas.
Investment 4.4.1 - Strengthening of the regional public transport zero- emission bus fleet
The objective of the investment is to reduce greenhouse gases emissions and modernise the public
buses fleet. This investment consists in the procurement of zero-emission buses and the installation of
charging stations.
Investment 4.4.3 – Renewal fleet for the National fire brigade command
The objective of the investment is to reduce greenhouse gases emissions and modernise the fire-
brigade fleet. This investment consists in the procurement of at least 3 800 vehicles for the National
Fire Brigade.
Investment 4.5 - Private and light commercial vehicle fleet renewal program with electric
vehicles
This investment aims at reducing greenhouse gases and air pollution caused by road transport in urban
areas. This investment consists in purchasing zero-emission vehicles and scrapping thermal vehicles.
Investment 5.4 – Equity injection into the Green Transition Fund (“GTF”) managed by CDP
Venture Capital SGR
This measure aims at supporting the growth potential of the Italian economy by incentivizing private
investments, improving access to finance for start-ups involved in the green transition, and developing
the venture capital market in this sector. The measure shall consist of an equity injection of
EUR 250 000 000 into the Green Transition Fund (“GTF”) managed by CDP Venture Capital SGR.
CDP Venture Capital SGR shall adopt an investment policy for the use of the equity. The investment
policy shall include the description of the financial product(s) with the expected type of eligible final
beneficiaries that the equity is expected to support, including the expected timeline for the
implementation of 15 years and the management fee of maximum 13%.31 The GTF shall operate by
31 In particular, the13% maximum cap does not include carried interested, performance fees related to GTF and
all costs and management fees related to third party funds.
196
providing equity, quasi equity, debt or quasi debt support, directly or indirectly.32 CDP Venture
Capital SGR shall adopt the audit and control system described in the guidelines “Linee Guida per le
attività di rendicontazione e controllo dei Fondi DTF e GTF” for the use of the equity. The Investment
Policy shall require that financial product(s) that the equity supports comply with the ‘Do no
significant harm’ (DNSH) principle as set out in the DNSH Technical Guidance (2021/C58/01). In
particular, in the case of general support to start ups, the investment policy shall exclude companies
with a substantial focus33 in the following sectors: (i) fossil fuel-based energy production and related
activities34; (ii) energy-intensive and/or high CO2-emitting industries35; (iii) production, rental, or sale
of polluting vehicles36; (iv) waste collection, waste treatment and disposal37, (v) processing of nuclear
fuel, production of nuclear energy. Moreover, the investment policy shall require compliance with the
relevant EU and national environmental legislation.
Investment 5.5. Green tax credit
The objective of this investment is to support the transition towards energy efficient, sustainable and
renewable-based production models for firms. The investment consists in granting a tax credit to firms
commensurate with eligible expenses incurred between 1 January 2024 and 31 December 2025, and
namely digital assets (4.0 tangible capital goods, 4.0 intangible capital goods38), and training staff in
skills for the green transition.
32 In particular, in case of direct investments, the GTF shall operate by providing equity or quasi equity support;
in case of indirect investments, the GTF shall operate by financing third party funds which shall operate by
providing at least one of the following: equity, or quasi-equity, or debt, or quasi-debt instruments.
33 It is considered that a Final Beneficiary has a “substantial focus” on a sector or business activity if such sector
or activity is identified as being an essential part of the business activity of the Final Beneficiary respectively in
relation to the gross revenue, profit, or client base of the Final Beneficiary. The gross revenue generated from
the restricted sector or activity shall, in any case, not exceed 50% of the gross revenue.
34 Except for (a) assets and activities in power and/or heat generation, as well as related transmission and
distribution infrastructure, using natural gas, that are compliant with the conditions set out in Annex III of the
‘Do no significant harm’ Technical Guidance (2021/C58/01) and (b) activities and assets under point (ii) for
which the use of fossil fuels is temporary and technically unavoidable for the timely transition towards a fossil
fuel free operation.
35 Including activities and assets under the EU Emission Trading System (ETS) achieving projected greenhouse
gas emissions that are not lower than the relevant benchmarks. Where the activity supported achieves projected
greenhouse gas emissions that are not significantly lower than the relevant benchmarks, an explanation of the
reasons why this is not possible shall be provided. Benchmarks established for free allocation for activities
falling within the scope of the Emissions Trading System, as set out in the Commission Implementing
Regulation (EU) 2021/447.
36 Polluting vehicles are defined as non-zero-emission vehicles.
37 This exclusion does not apply to actions in plants exclusively dedicated to treating non-recyclable hazardous
waste, and to existing plants, where the actions under this measure are for the purpose of increasing energy
efficiency, capturing exhaust gases for storage or use or recovering materials from incineration ashes, provided
such actions under this measure do not result in an increase of the plants’ waste processing capacity or in an
extension of the lifetime of the plants; for which evidence is provided at plant level. 38 In particular, the scheme refers to annexes A and B of law 11 December 2016, n. 232.
197
E.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and target Unit of
measure Baseline Goal Quarter Year
M2C2-6
Reform 1
Simplification of
authorization
procedures for
renewable onshore
and offshore plants
and new legal
framework to
sustain the
production from
renewable sources
and time and
eligibility extension
of the current
support schemes
Milestone
Entry into force
of a legal
framework for
the
simplification of
the
authorisation
procedures for
building-up
structures for
onshore and
off-shore
renewable
energies
Provision in the
law indicating
the entry into
force of the law
N/A N/A N/A Q1 2024
The legal framework shall include the following
objectives:
● the entry into force of simplification measures for renewable energy source installations and the repowering and revamping of existing plants, in coherence with the provisions of Decree law No. 76 of 17 July 2020 ‘’the Simplifications Decree’’;
● the enactment of a decree, agreed with the Regions and the other State Administrations concerned, aimed at defining criteria for the identification of the areas suitable and not suitable for the installation of renewable energy plants for an additional renewable energy production capacity of at least 73 GW, in coherence with the updated version of the PNIEC, for the achievement of the objectives of development of renewable sources;
● the completion of the RES support mechanism also for additional non-mature or with high operating cost technologies and the extension of the auction run period for the so called RES1 mechanism, while maintaining the principle of competitive access;
● provisions to promote investment in storage systems, in the legislative decree transposing Directive (EU) 2019/944 on
198
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and target Unit of
measure Baseline Goal Quarter Year
common rules for the internal market in electricity.
M2C2-7
Reform 2 New
legislation to
promote renewable
gas production and
consumption
Milestone
Entry into force
of a Legislative
Decree to
promote the
use of
renewable gas
for the use of
biomethane in
the transport,
industrial and
residential
sectors and an
Implementing
Decree setting
out the
conditions and
criteria in
relation to its
use and the
new incentive
system.
Provision in the
law indicating
the entry into
force of the law
N/A N/A N/A Q4 2021
The legislative decree shall include, in
particular:
1-legislative amendment for a simplified
authorization process and modification of the
current grants mechanism in order (i) to widen
the eligibility perimeter and (ii) to extend the
grants availability period and (iii) foresee the
feed in tariff mechanism and the Guarantee of
Origin for renewable gas
2-The transposition of the REDII directive by
legislative decree
3-The general coordination would be
accomplished by Ministero della Transizione
Ecologica (MiTE), with the support of the other
Administrations with advisory functions:
Ministry of Agriculture (MIPAAF), Ministry of
Economics and Finance (MEF) and Gestore
Servizi Energetici.
M2C2-8
Investment 2.1
Strengthening
smart grids
Milestone
Award of (all)
public contracts
for to increase
the network
Notification of
the award of
(all) public
contracts for
N/A N/A N/A Q4 2022
Notification of the award of (all) public contracts
to increase the network capacity for the
distribution of renewable energy and for the
electrification of energy consumption
199
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and target Unit of
measure Baseline Goal Quarter Year
capacity
M2C2-10
Investment 2.1
Strengthening
smart grids
Milestone
Increase in the
network hosting
capacity and
maximum
power delivered
forconsumption
Interventions
carried out N/A N/A N/A Q2 2026
Independent engineer report(s) certifying that
interventions have been carried out resulting in:
-an increase of the network hosting capacity by
at least 4 000 MW,
-an increase in the maximum power delivered
for consumption by the grid for a number of
Points Of Delivery corresponding to at least 1
500 000 inhabitants.
M2C2-12
Investment 2.2
Interventions to
increase the
resilience of power
grid
Milestone
Award of the
projects to
increase the
resilience of the
electricity
system network
Notification of
the award of
the projects
N/A N/A N/A Q4 2022
Award of the projects to increase the resilience
of at least 4 000 km in the electricity system
network so as to reduce the frequency and
duration of energy cuts arising from extreme
weather conditions.
M2C2-13
Investment 2.2
Interventions to
increase the
resilience of power
grid
Milestone
Increase the
resilience of
theelectric grid
Interventions
carried out N/A N/A N/A Q2 2026
Independent engineer report(s) certifying that
interventions have been carried out
corresponding to an increase in the resilience
of at least 4 000 km of electric grid.
M2C2-14
Investment 3.3
Hydrogen testing
for road transport
Milestone
Award of (all)
public contracts
for the
development of
re-charging
Notification of
the award of
(all) public
contracts for
the
N/A N/A N/A Q1 2023
Notification of the award of (all) public contracts
for the development of at least 40 re-charging
stations based on hydrogen in line with
Directive 2014/94/EU on Alternative Fuels
Infrastructure.
200
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and target Unit of
measure Baseline Goal Quarter Year
stations based
on hydrogen
development of
at least 40 re-
charging
stations based
on hydrogen
M2C2-16
Investment 3.4
Hydrogen testing
for railway mobility
Milestone
Allocation of
resources for
hydrogen
testing for
railway mobility
Notification of
the allocation of
resources
N/A N/A N/A Q1 2023
Allocation of resources according to the
procedures and criteria established to build ten
refuelling stations for railway based on
hydrogen along six railway lines.
M2C2-18
Investment 3.5
Hydrogen Research
and Development
Milestone
Award of all
public R&D
contracts to
research
projects on
hydrogen
Notification of
the award of
the contracts
on hydrogen
research and
development
N/A N/A N/A Q2 2022
Notification of the award of R&D contracts,
which shall aim to improve knowledge of the
implementation of the hydrogen vector in the
production, storage and distribution phases.
The contracts shall develop at least four
dimensions of research:
a) Green and Clean Hydrogen production
b) Innovative technologies for hydrogen
storage, transport and transformation into
derivates and e-fuels
c) Fuel Cells for stationary and mobility
application
d) Integrated smart management systems to
increase the resilience and reliability of
intelligent hydrogen-based infrastructures
201
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and target Unit of
measure Baseline Goal Quarter Year
This measure shall support hydrogen
production based on electrolysis using
renewable energy sources as defined in the
Directive (EU) 2018/2001 (renewable Directive)
or grid electricity, or hydrogen activities that
comply with the life-cycle GHG emissions
savings requirement of 73.4% for hydrogen
resulting in life-cycle GHG emissions lower
than 3tCO2e/tH2 and 70% for hydrogen-based
synthetic fuels relative to a fossil fuel
comparator of 94g CO2e/MJ in analogy to the
approach set out in Article 25(2) of and Annex
V to Directive (EU) 2018/2001.
M2C2-20
Reform 3
Administrative
simplification and
reduction of
regulatory barriers
to hydrogen
deployment
Milestone
Entry into force
of the
necessary
legislative
actions
Provision in the
law indicating
the entry into
force of the law
N/A N/A N/A Q1 2023
The necessary legislative actions shall set out
(i) security provisions in relation to the
production, transport and storage of hydrogen,
(ii) simplify procedures for the build-up of small
structures for the production of green hydrogen
and (iii) measures in relation to the conditions
to build re-charging stations based on
hydrogen.
This measure shall only support hydrogen
activities that comply with life cycle GHG
emissions savings requirement of 73.4 % for
hydrogen resulting in 3 tCO2eq/tH2.
M2C2-21 Reform 4 Measures
to promote
hydrogen
Milestone Entry into force
of fiscal
Provision in the
law indicating
the entry into
N.A N/A N/A Q2 2022 The law shall set out fiscal incentives to
support the production of green hydrogen and
to favour the consumption of green hydrogen
202
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and target Unit of
measure Baseline Goal Quarter Year
competitiveness incentives force of the law by the transport sector.
This measure shall only support hydrogen
activities that comply with life cycle GHG
emissions savings requirement of 73.4 % for
hydrogen resulting in 3 tCO2eq/tH2.
M2C2-22
Investment 4.1
Investment in soft
mobility (National
Plan of Cycle Path)
Target: Cycling lanes
T1 N/A Km 0 200 Q4 2023
Completion of at least 200 km of cycling lanes
in metropolitan areas, as defined in the
description of the measure or cities hosting
universities.
M2C2-23
Investment 4.1
Investment in soft
mobility (National
Plan of Cycle Path)
Target
Administrative
certificates for
the construction
of cycling lanes
N/A Km 200 1 261 Q2 2026
Administrative certificates confirming that works
for the construction of at least 1 261 km of
cycling lanes in metropolitan areas and of
tourist cycle paths have been carried out.
M2C2-27
Investment 4.3
Installation of
charging
infrastructures
Milestone
Award of all
public contracts
for the
installation of
charging
infrastructures
M1
Notification of
the award of all
the public
contracts for
the installation
of charging
infrastructures
N/A N/A N/A Q2 2023
Notification of the award of all public contracts
to build at least 4 700 re-charging stations in
urban areas (all municipalities).
The project may also include pilot re-charging
stations aimed at storing energy.
M2C2-28
Investment 4.3
Installation of
charging
infrastructures
Milestone
Award of public
contracts for
the installation
of charging
infrastructures
Award of public
contracts for
the installation
of charging
infrastructures
N/A N/A N/A Q4 2024 Award of the contracts to build at least 2 100
fast public charging infrastructure points along
freeways and at least 9 900 in urban areas.
203
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and target Unit of
measure Baseline Goal Quarter Year
M2C2-29
Investment 4.3
Installation of
charging
infrastructures
Target
Number of
charging
infrastructure
points
N/A Number 0 7 028 Q2 2026
Certificates of installation and acceptance of
the connection costs estimate by the developer
are provided for at least 7 028 charging
infrastructure points for electric vehicles either
along freeways or urban areas.
The charging infrastructure for electric vehicles
shall be of at least 175kW in freeways and
90kw in urban areas.
M2C2-30
Investment 4.5 -
Private and light
commercial vehicle
fleet renewal
program with
electric vehicles
Target
Number of
vehicles
purchased
N/A Number 0 30 830 Q2 2026
Signature of contracts for purchase of at least
30 830 zero-emission vehicles.
For each vehicle purchased, a scrapping
certificate demonstrating the scrapping of a
thermal vehicle shall also be provided.
M2C2-33
Investment 4.4.2:
Strengthening of
the regional public
transport railway
fleet with zero
emission trains and
universal service
Milestone
Award of all
public contracts
for the
strengthening
of regional
public transport
railway fleet
with zero
emission trains
and universal
Notification of
the award of all
the contracts
for the regional
public transport
railway fleet
with zero
emission trains
and universal
service
N/A N/A N/A Q2 2023 Notification of the award of all public contracts
for the acquisition of zero emission trains39.
39 In line with intervention field 72 bis of Annex VI to the Regulation (EU) 2021/241, it also applies to bi-mode trains.
204
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and target Unit of
measure Baseline Goal Quarter Year
service
M2C2-35
Investment 4.4.1:
Strengthening of
the regional public
transport bus fleet
with zero-emission
buses
Target
Number of
zero- emission
buses registred
T2
N/A Number 800 3 000 Q2 2026
Registration of at least 3 000 zero-emission
buses.
Eligible buses belong to the M2 and M3
category of vehicles according to UNECE
standards and are either electric or hydrogen
fuel cell.
M2C2-35
ter
Investment 4.4.1:
Strengthening of
the regional public
transport bus fleet
with zero-emission
buses
Target
Number of
charging points
for zero-and
low emissions
buses
N/A Number 0 1 000 Q2 2026
Administrative certificates confirming the
installation and acceptance of the connection
costs estimate by the developer for at least
1 000 charging points.
M2C2-36
Investment 4.4.3:
Renewal fleet for
the National fire
brigade command
Target
Number of
clean vehicles
for the renewal
fleet for the
National fire
brigade
command
N/A Number 0 3 800 Q4 2025
Registration of at least 3 800 clean vehicles for
the renewal fleet for the National fire brigade
command.
At least 3 500 vehicles shall be 100% electric
while the rest shall run on biofuel or
biomethane.
Biofuel producers shall have to provide
certificate(s) (Proof of Sustainability) issued by
independent evaluator(s), that are part of
voluntary schemes recognized by the
Commission or national schemes, in line with
Art. 30(1), 30(4) or 30(6) of Directive
205
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and target Unit of
measure Baseline Goal Quarter Year
2018/2001.
Moreover, the contract signed with the
biomethane supplier shall specify that the
operator shall purchase guarantee of origin
certificates for the expected fuel use.
Vehicles running on biofuel shall be type-
approved for B100.
M2C2-37
Reform 5: Smarter
procedures for
project evaluation in
the local public
transport systems
sector with fixed
installations and in
the rapid mass
transport sector
Milestone
Entry into force
of a Decree
Law
Provision in the
law indicating
the entry into
force of the
Decree law
N/A N/A N/A Q4 2021
The Decree Law shall simplify the evaluation
criteria for projects in relation to local public
transport and accelerate the design and
authorisation process
M2C2-38
Investment 5.1:
Renewables and
batteries
Milestone
Entry into force
of a Ministerial
Decree
Provision in the
law indicating
the entry into
force of the
Ministerial
Decree
N/A N/A N/A Q2 2022
The Ministerial Decree shall identify the amount
of available resources, the access
requirements of the beneficiaries, the eligibility
conditions for programs and projects, the
eligible expenses and the form and intensity of
aid for the development of high-efficiency PV
panels and for the development of batteries.
M2C2-41 Investment 5.3:
Electric buses Milestone
Entry into force
of a Ministerial
Decree which
Provision in the
Ministerial
Decree
N/A N/A N/A Q4 2021 The Ministerial Decree shall identify the amount
of available resources to implement of
approximately 45 industrial transformation
206
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and target Unit of
measure Baseline Goal Quarter Year
identifies the
amount of
available
resources for
reaching the
purpose of
intervention
(busses supply
chain)
indicating the
entry into force
projects through “Development contracts
M2C2-42
Investment 5.4:
Equity injection into
the Green
Transition Fund
(“GTF”)
Milestone
Signature of the
financial
Agreement
Notification of
the signature of
the financial
Agreement
N/A N/A N/A Q2 2022
The Financial Agreement shall set out the
indirect investment into finance VC fund
managers with investment and enterprises/start
up in line with green transition objectives, to
expand the capital available to researchers and
start-ups, to strengthen the action of active VC
funds, to develop new and innovative ventures
in partnership with corporates.
The financial agreement shall include:
- an investment policy, - eligibility criteria, compliance with the ‘Do no significant harm’
Technical Guidance (2021/C58/01) of
supported transactions under this measure
through the use of sustainability proofing, an
exclusion list, and the requirement of
compliance with the relevant EU and national
environmental legislation.
207
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and target Unit of
measure Baseline Goal Quarter Year
M2C2-55 Investment 5.5:
Green tax credit Target
Tax credits
granted to firms
based on
documents
presented in
2024-2025
N/A
Amount of
granted
resources
(EUR)
0 721 000 000 Q2 2026
Notification of the granting of all RRF resources
earmarked for this investment.
At least EUR 288 400 000 of the investment
shall contribute to the climate change
objectives in accordance with Annex VI to the
RRF Regulation.
208
E.3. Description of the reforms and investments for the loan
Investment 1.1 - Development of agri-voltaic systems
This measure shall consist of a public investment in a grant Scheme in order to incentivise private investment
and improve access to finance in Italy’s agricultural and renewable energy sector. The scheme shall operate
by providing grants directly to the private sector.
The Scheme shall be managed by Gestore Servizi Energetici S.p.A. (GSE) as the implementing partner. The
Scheme shall provide a grant covering a portion of the projects’ cost. The scheme shall support the
construction of agri-voltaic systems, consisting of the installation of photovoltaic plants on agricultural land
along with measuring instruments to monitor the underlying agricultural activity40.
In order to implement the investment into the Scheme, Italy and GSE shall sign an Implementing Agreement
that shall include the following content:
1. Description of the decision-making process of the Scheme: The final award decision of the
Scheme shall be taken by an investment committee or other relevant equivalent governing body
and approved by a majority of votes from members who are independent from the government.
2. Key requirements of the associated grant policy,which shall include:
a. The description of the grants provided and eligible final beneficiaries.
b. The requirement that all investments supported are economically viable.
c. The requirement to comply with the ‘Do no significant harm’ (DNSH) principle as set out in the
DNSH Technical Guidance (2021/C58/01). In particular, the grant policy shall exclude the
following list of activities and assets from eligibility: (i) activities and assets related to fossil fuels,
including downstream use41, (ii) activities and assets under the EU Emission Trading System
(ETS) achieving projected greenhouse gas emissions that are not lower than the relevant
benchmarks42, (iii) activities and assets related to waste landfills, incinerators43 and mechanical
biological treatment plants44.
40 Final beneficiaries associated to specific projects shall be required to provide a justification of the selected
intervention field for each project supported, together with a description of the project, for the purpose of the
computation of the climate contribution. For the purposeof the computation of the climate contribution, final
beneficiaries from equity, quasi-equity, corporate bonds orequivalent instruments not targeted to specific projects shall
provide a justification for the selected intervention field(s). The implementing partner shall also be required to provide
to the Member State a semi-annual report on the implementation of each project/activity. 41 Except for (a) assets and activities in power and/or heat generation, as well as related transmission and distribution
infrastructure, using natural gas, that are compliant with the conditions set out in Annex III of the ‘Do no significant
harm’ Technical Guidance (2021/C58/01) and (b) activities and assets under point (ii) for which the use of fossil fuels is
temporary and technically unavoidable for the timely transition towards a fossil fuel free operation. 42 Where the activity supported achieves projected greenhouse gas emissions that are not significantly lower than the
relevant benchmarks, an explanation of the reasons why this is not possible shall be provided. Benchmarks established
for free allocation for activities falling within the scope of the Emissions Trading System, as set out in the Commission
Implementing Regulation (EU) 2021/447. 43 This exclusion does not apply to actions under this measure in plants exclusively dedicated to treating non-recyclable
hazardous waste, and to existing plants, where the actions under this measure are for the purpose of increasing energy
efficiency, capturing exhaust gases for storage or use or recovering materials from incineration ashes, provided such
actions under this measure do not result in an increase of the plants’ waste processing capacity or in an extension of the
lifetime of the plants; for which evidence is provided at plant level. 44 This exclusion does not apply to actions under this measure in existing mechanical biological treatment plants, where
the actions under this measure are for the purpose of increasing energy efficiency or retrofitting to recycling operations
of separated waste to compost bio-waste and anaerobic digestion of bio-waste, provided such actions under this measure
do not result in an increase of the plants’ waste processing capacity or in an extension of the lifetime of the plants; for
which evidence is provided at plant level.
209
d. The requirement that final beneficiaries of the Scheme shall not receive support from other Union
instruments to cover the same cost.
3. The amount covered by the Implementing Agreement, the fee structure for the Implementing
Partner and the requirement to use any unused proceeds of the scheme, including beyond 2026, for
the same policy purposes.
4. Monitoring, audit, and control requirements, including:
1. The description of the implementing partner’s monitoring system to report on the subsidies
mobilized.
2. The description of the implementing partner’s procedures that will ensure the prevention,
detection and correction of fraud, corruption, and conflicts of interests.
3. The obligation to verify the eligibility of every operation in accordance with the
requirements laid out in the Implementing Agreement before awarding a subsidy to an
operation.
4. The obligation of carrying out risk-based ex-post audits in accordance with an audit plan of
the GSE. These audits shall verify:
i) that the control systems are effective, including the detection of fraud, corruption, and
conflict of interests;
ii) compliance with the DNSH principle, the State Aid rules, the climate target requirements;
and
iii) that the requirement that final beneficiaries of the Scheme have not received support
from other Union instruments to cover the same cost is respected. The audits shall also
verify the legality of the transactions and that the conditions of the applicable Implementing
Agreement and grant agreements are being respected.
Investment 1.2 - Promotion of RES for energy communities and jointly acting renewables self-
consumers
This measure shall consist of a public investment in a Grant Scheme in order to incentivise private
investment and improve access to finance in Italy to support the installation of new power generation
capacity for collective configurations and renewable energy communities located in municipalities with
population below 50 000 inhabitans45. The Scheme shall operate by providing grants directly to the private
sector as well as to public sector entities engaged in similar activities.
The Scheme shall be managed by Gestore dei Servizi Energetiche S.p.A. [hereafter referred to as GSE] as the
implementing partner. The Scheme shall include the following product line:
• Grant covering maximum 40% of the project costs for the construction of renewable energy sources
and production plants, possibly coupled to energy storage.
In order to implement the investment into the Scheme, Italy and the GSE shall sign an Implementing
Agreement that shall include the following content:
45 Final beneficiaries associated to specific projects shall be required to provide a justification of the selected
intervention field for each project supported, together with a description of the project, for the purpose of the
computation of the climate contribution. For the purpose of the computation of the climate contribution, final
beneficiaries from equity,quasi-equity, corporate bonds or equivalent instruments not targeted to specific projects shall
provide a justification for the selected intervention field(s). The implementing partner shall also be required to provide
to the Member State a semi-annual report on the implementation of each project/activity.
210
1. Description of the decision-making process of the Scheme: The final award decision of the Scheme
shall be taken by an investment committee or other relevant equivalent governing body and
approved by a majority of votes from members who are independent from the government.
2. Key requirements of the associated grant policy,which shall include:
a. The description of the grants provided and eligible final beneficiaries.
b. The requirement that all investments supported are economically viable.
c. The requirement to comply with the ‘Do no significant harm’ (DNSH) principle as set out in the
DNSH Technical Guidance (2021/C58/01). In particular, the grant policy shall exclude the
following list of activities and assets from eligibility: (i) activities and assets related to fossil fuels,
including downstream use46, (ii) activities and assets under the EU Emission Trading System
(ETS) achieving projected greenhouse gas emissions that are not lower than the relevant
benchmarks47, (iii) activities and assets related to waste landfills, incinerators48 and mechanical
biological treatment plants49.
d. The requirement that final beneficiaries of the Scheme shall not receive support from other Union
instruments to cover the same cost.
3. The amount covered by the Implementing Agreement, the fee structure for the Implementing Partner
and the requirement to use any unused proceeds of the scheme, including beyond 2026, for the same
policy purposes.
4. Monitoring, audit, and control requirements, including:
1. The description of the implementing partner’s monitoring system to report on the grants
mobilized.
2. The description of the implementing partner’s procedures that will ensure the prevention,
detection and correction of fraud, corruption, and conflicts of interests.
3. The obligation to verify the eligibility of every operation in accordance with the
requirements laid out in the Implementing Agreement before awarding a grant to an
operation.
4. The obligation of carrying out risk-based ex-post audits in accordance with an audit plan of
the GSE. These audits shall verify i) that the control systems are effective, including the
detection of fraud, corruption, and conflict of interests; ii) compliance with the DNSH
principle, the State Aid rules; and iii) that the requirement that final beneficiaries of the
Scheme have not received support from other Union instruments to cover the same cost is
46 Except for (a) assets and activities in power and/or heat generation, as well as related transmission and distribution
infrastructure, using natural gas, that are compliant with the conditions set out in Annex III of the ‘Do no significant
harm’ Technical Guidance (2021/C58/01) and (b) activities and assets under point (ii) for which the use of fossil fuels is
temporary and technically unavoidable for the timely transition towards a fossil fuel free operation. 47 Where the activity supported achieves projected greenhouse gas emissions that are not significantly lower than the
relevant benchmarks, an explanation of the reasons why this is not possible shall be provided. Benchmarks established
for free allocation for activities falling within the scope of the Emissions Trading System, as set out in the Commission
Implementing Regulation (EU) 2021/447. 48 This exclusion does not apply to actions under this measure in plants exclusively dedicated to treating non-recyclable
hazardous waste, and to existing plants, where the actions under this measure are for the purpose of increasing energy
efficiency, capturing exhaust gases for storage or use or recovering materials from incineration ashes, provided such
actions under this measure do not result in an increase of the plants’ waste processing capacity or in an extension of the
lifetime of the plants; for which evidence is provided at plant level. 49 This exclusion does not apply to actions under this measure in existing mechanical biological treatment plants, where
the actions under this measure are for the purpose of increasing energy efficiency or retrofitting to recycling operations
of separated waste to compost bio-waste and anaerobic digestion of bio-waste, provided such actions under this measure
do not result in an increase of the plants’ waste processing capacity or in an extension of the lifetime of the plants; for
which evidence is provided at plant level.
211
respected. The audits shall also verify the legality of the transactions and that the conditions
of the applicable Implementing Agreement and Grant Agreements are being respected.
Investment 1.4 - Development of bio-methane, according to criteria for promoting the circular
economy
This measure shall consist of a public investment in a grant Scheme in order to incentivise private investment
and improve access to finance in Italy’s biomethane production. The Scheme shall operate by providing
grants directly to the private sector50.
The Scheme shall be managed by Gestore dei Servizi Energetici (GSE) as the implementing partner. The
Scheme shall include at least one of the following product lines:
• Support for the construction of new plants for the production of bio-methane.
• Reconverting and improving the efficiency of existing agricultural biogas plants (including Organic
Fraction of Urban Solid Waste – OFUSW) towards the production of biomethane for transport,
industry and heating.
• Replacement of obsolete and low-efficiency mechanical vehicles with vehicles powered by
biomethane.
• Support of environmentally sustainable practices in biogas production, including reduced soil
disturbance practices (minimum tillage) and the deployment of low-emission systems for digestate
application.
• Increasing the efficiency of existing biogas production plants, including on-site heat recovery and
emissions reduction.
In order to implement the investment into the Scheme, Italy and GSE shall sign an Implementing Agreement
that shall include the following content:
1. Description of the decision-making process of the Scheme: The final award decision of the Scheme
shall be taken by an investment committee or other relevant equivalent governing body and
approved by a majority of votes from members who are independent from the government.
2. Key requirements of the associated grant policy,which shall include:
a. The description of the grants provided and eligible final beneficiaries.
b. The requirement that all investments supported are economically viable.
c. The requirement to comply with the ‘Do no significant harm’ (DNSH) principle as set out in the
DNSH Technical Guidance (2021/C58/01). In particular, the grant policy shall exclude the
following list of activities and assets from eligibility: (i) activities and assets related to fossil fuels,
including downstream use51, (ii) activities and assets under the EU Emission Trading System
(ETS) achieving projected greenhouse gas emissions that are not lower than the relevant
50 Final beneficiaries associated to specific projects shall be required to provide a justification of the selected
intervention field for each project supported, together with a description of the project, for the purpose of the
computation of the climate contribution. For the purpose of the computationof the climate contribution, final
beneficiaries from equity, quasi-equity, corporate bonds or equivalent instruments not targeted to specific projects shall
provide a justification for the selected intervention field(s). The implementing partner shall also be required to provide
to the Member State a semi-annual report on the implementation of each project/activity. 51Except for (a) assets and activities in power and/or heat generation, as well as related transmission and distribution
infrastructure, using natural gas, that are compliant with the conditions set out in Annex III of the ‘Do no significant
harm’ Technical Guidance (2021/C58/01) and (b) activities and assets under point (ii) for which the use of fossil fuels is
temporary and technically unavoidable for the timely transition towards a fossil fuel free operation.
212
benchmarks52, (iii) activities and assets related to waste landfills, incinerators53 and mechanical
biological treatment plants54. The biomethane and biogas shall comply with the criteria set out in
Directive 2018/2001 (RED II Directive) and with the relevant requirements of footnote 8 of
Annex VI of the Regulation (EU) 2021/241. Moreover, for vehicles running on biomethane, the
legal agreement with the operator shall specify that the operator shall purchase guarantee of origin
certificates for the expected fuel use.
d. The requirement that final beneficiaries of the Scheme shall not receive support from other Union
instruments to cover the same cost.
3. The amount covered by the Implementing Agreement, the fee structure for the Implementing Partner
and the requirement to use any unused proceeds of the scheme, including beyond 2026, for the same
policy purposes.
4. Monitoring, audit, and control requirements, including:
1. The description of the implementing partner’s monitoring system to report on the subsidies
mobilized.
2. The description of the implementing partner’s procedures that will ensure the prevention,
detection and correction of fraud, corruption, and conflicts of interests.
3. The obligation to verify the eligibility of every operation in accordance with the
requirements laid out in the Implementing Agreement before awarding a subsidy to an
operation.
4. The obligation of carrying out risk-based ex-post audits in accordance with an audit plan of
the GSE. These audits shall verify i) that the control systems are effective, including the
detection of fraud, corruption, and conflict of interests; ii) compliance with the DNSH
principle, the State Aid rules, the climate target requirements; and iii) that the requirement
that final beneficiaries of the Scheme have not received support from other Union
instruments to cover the same cost is respected. The audits shall also verify the legality of
the transactions and that the conditions of the applicable Implementing Agreement grant
agreements are being respected.
Investment 2.1 - Strengthening smart grids
The objective of this investment is the infrastructural upgrade and digitalisation of the electricity distribution
grid. The investment consists in providing grants to grid operators to finance interventions that increase the
hosting capacity of the grid as well as the maximum power delivered for consumption by the grid.
Investment 2.2 - Interventions to increase the resilience of the power grid
The objective of this investment is to increase the resilience of the transmission and distribution grid to
extreme weather events, hence reducing the probability of prolonged interruptions of electricity supply. The
investment consists in providing grants to grid operators for works increasing the resilience of the power
grid.
52 Where the activity supported achieves projected greenhouse gas emissions that are not significantly lower than the
relevant benchmarks, an explanation of the reasons why this is not possible shall be provided. Benchmarks established
for free allocation for activities falling within the scope of the Emissions Trading System, as set out in the Commission
Implementing Regulation (EU) 2021/447. 53 This exclusion does not apply to actions under this measure in plants exclusively dedicated to treating non-recyclable
hazardous waste, and to existing plants, where the actions under this measure are for the purpose of increasing energy
efficiency, capturing exhaust gases for storage or use or recovering materials from incineration ashes, provided such
actions under this measure do not result in an increase of the plants’ waste processing capacity or in an extension of the
lifetime of the plants; for which evidence is provided at plant level. 54 This exclusion does not apply to actions under this measure in existing mechanical biological treatment plants, where
the actions under this measure are for the purpose of increasing energy efficiency or retrofitting to recycling operations
of separated waste to compost bio-waste and anaerobic digestion of bio-waste, provided such actions under this measure
do not result in an increase of the plants’ waste processing capacity or in an extension of the lifetime of the plants; for
which evidence is provided at plant level.
213
Investment 3.1 - Production of Hydrogen in brownfield sites (Hydrogen Valleys)
The objective of this investment is to create new hydrogen valleys, that is local production and use of
renewable hydrogen in industry, SMEs, and local transport in abandoned industrial areas. The investment
consists in providing grants to carry out projects to create hydrogen valleys.
Investment 3.2 - Hydrogen Use in hard-to-abate industry
This investment consists in supporting R&D&I on industrial processes to develop initiatives to use hydrogen
in industrial sectors that use methane as an energy source for thermal energy (cement, paper mills, ceramic,
glass industries, etc.). The fossil fuel sector such as oil refineries shall not be eligible. This measure shall
support hydrogen production based on electrolysis using renewable energy sources as defined in the
Directive (EU) 2018/2001 (renewable Directive) or grid electricity.
In order to ensure that the measure complies with the ‘Do no significant harm’ principle under the Recovery
and Resilience Facility as set out in the DNSH Technical Guidance (2021/C58/01), the eligibility criteria in
upcoming calls shall exclude activities under the EU Emission Trading System (ETS) achieving projected
greenhouse gas emissions that are not lower than the relevant benchmarks. Where the activity achieves
projected greenhouse gas emissions that are not significantly lower, but still lower than the relevant
benchmarks, an explanation of the reasons why this is not possible shall be provided. Benchmarks
established for free allocation for activities falling within the scope of the Emissions Trading System, as set
out in the Commission Implementing Regulation (EU) 2021/447.
Investment 3.4 - Hydrogen testing for railway mobility and road transport
The objective of this investment is to contribute to the use of hydrogen for refuelling purposes.
This investment consists in building refuelling stations for railway based on hydrogen to be preferably
located near local renewable hydrogen production sites and/or motorway hydrogen refuelling stations, and
hydrogen-based refuelling stations for road transport.
Investment 3.5 - Hydrogen Research and Development
The objective of this investment is to support research and development across the hydrogen value chain.
The investment consists in supporting hydrogen R&D projects concerning green hydrogen production,
hydrogen storage, transport and transformation into derivates and e-fuels, fuel cells, and integrated smart
management systems for hydrogen-based infrastructure.
Investment 4.2 - Development of Rapid Mass Transport systems
The objective of the measure is to increase rapid mass transport system ridership, favouring a modal shift
from car transport to public transport. This investment consists in the construction of new and the extension
of existing lines of rapid mass transport systems, the upgrade of the infrastructure of rapid mass transport
systems, and the purchase of zero-emission rolling stock for rapid mass transport systems.
Investment 4.4.1 - Strengthening of the regional public transport zero- emission bus fleet
The objective of the investment is to reduce greenhouse gases emissions and modernise the public buses
fleet. This investment consists in the procurement of zero-emission buses and the installation of charging
stations.
Investment 4.4.2 – Strengthening of the regional public transport railway fleet with zero emission
trains and universal service
The objective of the investment is to reduce greenhouse gases emissions of railway transport and modernise
the railway fleet. This investment consists in the procurement of at least 118 zero emission passengers’ trains.
214
Investment 4.4.3 – Renewal fleet for the National fire brigade command
The objective of the investment is to reduce greenhouse gases emissions and modernise the fire-brigade fleet.
This investment consists in the procurement of at least 3 800 vehicles for the National Fire Brigade.
Investment 4.6 - Diagnostic trains
The measure aims at strengthening the fleet of diagnostic trains. The measure consists in the purchase of at
least 7 diagnostic trains and in the equipment of at least 2 diagnostic trains.
Investment 5.1 – Support to the production system for the Ecological Transition, Net Zero
Technologies, and competitiveness and resilience of strategic supply chains
This measure shall consist of two sub-investments.
Sub-investment 1:
This sub-investment shall consist of a public investment in a Facility, “Net Zero Technologies”, in order to
incentivise private investment and improve access to finance in the fields of energy efficiency, renewable
generation for auto-consumption, and sustainable transformation of the production process.
The investment shall support:
i) the ecological transition of the national production system at various levels by supporting
investments about the strengthening of production chains for devices and their direct and indirect
components relevant to the ecological transition (for example battery and energy storage, solar and
wind technologies, heat pumps and geothermal energy technologies, hydrogen technologies, and
devices for carbon capture and storage),
ii) the energy efficiency of production processes (also through the production for self-consumption of
electricity from renewable sources, with the exclusion of biomass),
iii) the sustainability of production processes, also with a view to the circular economy and more
efficient use of resources.
The investment i) shall include the following product lines:
- The first one focuses on the manufacturing of photovoltaic or wind technologies.
- The second one focuses on the manufacturing of batteries..
The Facility shall operate by providing non-repayable grants, subsidised loans, and interest subsidies directly
to the private sector.
The Facility shall be managed by Invitalia S.p.A. as the implementing partner. The Facility shall include the
following financial instruments:
• Development Contract which shall support Net Zero Technologies projects larger than
EUR 20 000 000 by providing grants, interest rate subsidies, and subsidised loans.
• Fund for the Industrial Transformation which shall support projects between EUR 3 000 000 and
EUR 20 000 000, by providing grants.
In order to implement the investment into the Facility, Italy and Invitalia S.p.A. shall sign an Implementing
Agreement that shall include the following content:
1. Description of the decision-making process of the Facility: The final investment and award decisions
of the Facility shall be taken by an investment committee or other relevant equivalent governing
body and approved by a majority of votes from members who are independent from the government.
2. Key requirements of the associated investment policy, which shall include:
a. The description of the financial products and eligible final beneficiaries.
b. The requirement that all investments supported are economically viable.
c. The requirement to comply with the ‘Do no significant harm’ (DNSH) principle as set out in
the DNSH Technical Guidance (2021/C58/01). In particular, the investment policy shall
215
exclude the following list of activities and assets from eligibility: (i) activities and assets
related to fossil fuels, including downstream use55, (ii) activities and assets under the EU
Emission Trading System (ETS) achieving projected greenhouse gas emissions that are not
lower than the relevant benchmarks56, (iii) activities and assets related to waste landfills,
incinerators57 and mechanical biological treatment plants58.
d. The requirement that final beneficiaries of the Facility shall not receive support from other
Union instruments to cover the same cost.
3. The amount covered by the Implementing Agreement, the fee structure for the Implementing Partner
and the requirement to reinvest any reflows according to the investment policy of the Facility.
4. Monitoring, audit, and control requirements, including:
a. The description of the implementing partner’s monitoring system to report on the investment
mobilized.
b. The description of the implementing partner’s procedures that shall ensure the prevention,
detection and correction of fraud, corruption, and conflicts of interests.
c. The obligation to verify the eligibility of every operation in accordance with the requirements
laid out in the Implementing Agreement before committing to finance an operation.
d. The obligation of carrying out risk-based ex-post audits in accordance with an audit plan of
the Invitalia S.p.A. These audits shall verify:
i. that the control systems are effective, including the detection of fraud, corruption, and
conflict of interests;
ii. compliance with the DNSH principle, the State Aid rules, the climate target
requirements; and
iii. that the requirement that final beneficiaries of the Facility have not received support
from other Union instruments to cover the same cost is respected. The audits shall also
verify the legality of the transactions and that the conditions of the applicable
Implementing Agreement are being respected.
5. Requirements for climate investments carried out by the implementing partner: at least EUR 660 000 000
of the RRF investment into the Facility shall contribute to the climate change objectives in accordance with
Annex VI to the RRF Regulation59.
55 Except for (a) assets and activities in power and/or heat generation, as well as related transmission and distribution
infrastructure, using natural gas, that are compliant with the conditions set out in Annex III of the ‘Do no significant
harm’ Technical Guidance (2021/C58/01) and (b) activities and assets under point (ii) for which the use of fossil fuels is
temporary and technically unavoidable for the timely transition towards a fossil fuel free operation. 56 Where the activity supported achieves projected greenhouse gas emissions that are not significantly lower than the
relevant benchmarks, an explanation of the reasons why this is not possible shall be provided. Benchmarks established
for free allocation for activities falling within the scope of the Emissions Trading System, as set out in the Commission
Implementing Regulation (EU) 2021/447. 57 This exclusion does not apply to actions under this measure in plants exclusively dedicated to treating non-recyclable
hazardous waste, and to existing plants, where the actions under this measure are for the purpose of increasing energy
efficiency, capturing exhaust gases for storage or use or recovering materials from incineration ashes, provided such
actions under this measure do not result in an increase of the plants’ waste processing capacity or in an extension of the
lifetime of the plants; for which evidence is provided at plant level. 58 This exclusion does not apply to actions under this measure in existing mechanical biological treatment plants, where
the actions under this measure are for the purpose of increasing energy efficiency or retrofitting to recycling operations
of separated waste to compost bio-waste and anaerobic digestion of bio-waste, provided such actions under this measure
do not result in an increase of the plants’ waste processing capacity or in an extension of the lifetime of the plants; for
which evidence is provided at plant level. 59 Final beneficiaries associated to specific projects shall be required to provide a justification of the selected
intervention field for each project supported, together with a description of the project, for the purpose of the
computation of the climate contribution. For the purpose of the computation of the climate contribution, final
beneficiaries from equity,quasi-equity, corporate bonds or equivalent instruments not targeted to specific projects shall
provide a justification for the selected intervention field(s). The implementing partner shall also be required to provide
to the Member State a semi-annual report on the implementation of each project/activity.
216
217
Sub-investment 2:
This sub-investment shall consist of a public investment in a Facility, “Competitiveness and resilience of
strategic supply chains”, in order to incentivise private investment and improve access to finance to
strengthen industrial supply chains.
The investment shall support projects related to key strategic value chains, such as industrial development
programs and environmental protection development programs.
The Facility shall operate by providing non-repayable grants, subsidised loans, and interest subsidies directly
to the private sector.
The Facility shall be managed by Invitalia S.p.A. as the implementing partner.
In order to implement the investment into the Facility, Italy and Invitalia shall sign an Implementing
Agreement that shall include the following content:
1. Description of the decision-making process of the Facility: The final investment and award decisions
of the Facility shall be taken by an investment committee or other relevant equivalent governing
body and approved by a majority of votes from members who are independent from the government.
2. Key requirements of the associated investment policy, which shall include:
i) The description of the financial product(s) and eligible final beneficiaries.
ii) The requirement that all investments supported are economically viable.
iii) The requirement to comply with the ‘Do no significant harm’ (DNSH) principle as set out in the
DNSH Technical Guidance (2021/C58/01). In particular, the investment policy shall exclude the
following list of activities and assets from eligibility: (i) activities and assets related to fossil
fuels, including downstream use60, (ii) activities and assets under the EU Emission Trading
System (ETS) achieving projected greenhouse gas emissions that are not lower than the relevant
benchmarks61, (iii) activities and assets related to waste landfills, incinerators62 and mechanical
biological treatment plants63.
iv) The requirement that final beneficiaries of the Facility shall not receive support from other
Union instruments to cover the same cost.
3. The amount covered by the Implementing Agreement, the fee structure for the Implementing Partner
and the requirement to reinvest any reflows according to the investment policy of the Facility.
4. Monitoring, audit, and control requirements, including:
a. The description of the implementing partner’s monitoring system to report on the investment
mobilized.
60 Except for (a) assets and activities in power and/or heat generation, as well as related transmission and distribution
infrastructure, using natural gas, that are compliant with the conditions set out in Annex III of the ‘Do no significant
harm’ Technical Guidance (2021/C58/01) and (b) activities and assets under point (ii) for which the use of fossil fuels is
temporary and technically unavoidable for the timely transition towards a fossil fuel free operation. 61 Where the activity supported achieves projected greenhouse gas emissions that are not significantly lower than the
relevant benchmarks, an explanation of the reasons why this is not possible shall be provided. Benchmarks established
for free allocation for activities falling within the scope of the Emissions Trading System, as set out in the Commission
Implementing Regulation (EU) 2021/447. 62 This exclusion does not apply to actions under this measure in plants exclusively dedicated to treating non-recyclable
hazardous waste, and to existing plants, where the actions under this measure are for the purpose of increasing energy
efficiency, capturing exhaust gases for storage or use or recovering materials from incineration ashes, provided such
actions under this measure do not result in an increase of the plants’ waste processing capacity or in an extension of the
lifetime of the plants; for which evidence is provided at plant level. 63 This exclusion does not apply to actions under this measure in existing mechanical biological treatment plants, where
the actions under this measure are for the purpose of increasing energy efficiency or retrofitting to recycling operations
of separated waste to compost bio-waste and anaerobic digestion of bio-waste, provided such actions under this measure
do not result in an increase of the plants’ waste processing capacity or in an extension of the lifetime of the plants; for
which evidence is provided at plant level.
218
b. The description of the implementing partner’s procedures that shall ensure the prevention,
detection and correction of fraud, corruption, and conflicts of interests.
c. The obligation to verify the eligibility of every operation in accordance with the
requirements laid out in the Implementing Agreement before committing to finance an
operation.
d. The obligation of carrying out risk-based ex-post audits in accordance with an audit plan of
the Invitalia SPA. These audits shall verify:
i. that the control systems are effective, including the detection of fraud, corruption,
and conflict of interests;
ii. compliance with the DNSH principle, the State Aid rules, the climate target
requirements; and
iii. that the requirement that final beneficiaries of the Facility have not received support
from other Union instruments to cover the same cost is respected. The audits shall
also verify the legality of the transactions and that the conditions of the applicable
Implementing Agreement are being respected.
Investment 5.2 - Development of an international, industrial and R&D leadership in hydrogen
The objective of this investment is to support the development of hydrogen in Italy. This investment consists
in financing projects for the manufacturing of electrolysers.
Investment 5.3 – Development of an international, industrial and R&D leadership in electric buses
This investment consists in supporting about 45 projects that can promote the digital and green
transformation of bus industry to product electric and connected buses. This investment is also expected to
support investments on the renewal of the electric bus fleet (without covering hybrid buses).
Investment 5.4 – Equity injection into the Green Transition Fund (“GTF”) managed by CDP Venture
Capital SGR
This measure aims at supporting the growth potential of the Italian economy by incentivizing private
investments, improving access to finance for start-ups involved in the green transition, and developing the
venture capital market in this sector. The measure shall consist of an equity injection of EUR 250 000 000
into the Green Transition Fund (“GTF”) managed by CDP Venture Capital SGR.
CDP Venture Capital SGR shall adopt an investment policy for the use of the equity. The investment policy
shall include the description of the financial product(s) with the expected type of eligible final beneficiaries
that the equity is expected to support, including the expected timeline for the implementation of 15 years and
the management fee of maximum 13%.64 The GTF shall operate by providing equity, quasi equity, debt or
quasi debt support, directly or indirectly.65 CDP Venture Capital SGR shall adopt the audit and control
system described in the guidelines “Linee Guida per le attività di rendicontazione e controllo dei Fondi DTF
e GTF” for the use of the equity. The Investment Policy shall require that financial product(s) that the equity
supports comply with the ‘Do no significant harm’ (DNSH) principle as set out in the DNSH Technical
Guidance (2021/C58/01). In particular, in the case of general support to start ups, the investment policy shall
exclude companies with a substantial focus66 in the following sectors: (i) fossil fuel-based energy production
64 In particular, the13% maximum cap does not include carried interested, performance fees related to GTF and all costs
and management fees related to third party funds. 65 In particular, in case of direct investments, the GTF shall operate by providing equity or quasi equity support; in case
of indirect investments, the GTF shall operate by financing third party funds which shall operate by providing at least
one of the following: equity, or quasi-equity, or debt, or quasi-debt instruments.
66 It is considered that a Final Beneficiary has a “substantial focus” on a sector or business activity if such sector or
activity is identified as being an essential part of the business activity of the Final Beneficiary respectively in relation to
the gross revenue, profit, or client base of the Final Beneficiary. The gross revenue generated from the restricted sector
or activity shall, in any case, not exceed 50% of the gross revenue.
219
and related activities67; (ii) energy-intensive and/or high CO2-emitting industries68; (iii) production, rental, or
sale of polluting vehicles69; (iv) waste collection, waste treatment and disposal70, (v) processing of nuclear
fuel, production of nuclear energy. Moreover, the investment policy shall require compliance with the
relevant EU and national environmental legislation.
67 Except for (a) assets and activities in power and/or heat generation, as well as related transmission and distribution
infrastructure, using natural gas, that are compliant with the conditions set out in Annex III of the ‘Do no significant
harm’ Technical Guidance (2021/C58/01) and (b) activities and assets under point (ii) for which the use of fossil fuels is
temporary and technically unavoidable for the timely transition towards a fossil fuel free operation.
68 Including activities and assets under the EU Emission Trading System (ETS) achieving projected greenhouse gas
emissions that are not lower than the relevant benchmarks. Where the activity supported achieves projected greenhouse
gas emissions that are not significantly lower than the relevant benchmarks, an explanation of the reasons why this is
not possible shall be provided. Benchmarks established for free allocation for activities falling within the scope of the
Emissions Trading System, as set out in the Commission Implementing Regulation (EU) 2021/447.
69 Polluting vehicles are defined as non-zero-emission vehicles.
70 This exclusion does not apply to actions in plants exclusively dedicated to treating non-recyclable hazardous waste,
and to existing plants, where the actions under this measure are for the purpose of increasing energy efficiency,
capturing exhaust gases for storage or use or recovering materials from incineration ashes, provided such actions under
this measure do not result in an increase of the plants’ waste processing capacity or in an extension of the lifetime of the
plants; for which evidence is provided at plant level.
220
E.4. Milestones, targets, indicators, and timetable for monitoring and implementation for the loan
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone
/ Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
M2C2-5
Investment 1.4
Development of
biomethane,
according to
criteria for
promoting the
circular economy
Milestone
Implementing
agreement,
legal
agreements
signed with
final
beneficiaries
and
investment
completion
Entry into force of
implementing
agreement, legal
agreements
signed and
certificate of
transfer
N/A N/A N/A Q2 2026
Entry into force of the implementing
agreement.
Italy shall transfer EUR 2 236 020 000 to the
GSE for the facility.
The GSE shall have entered into legal grant
agreements with final beneficiaries for an
amount necessary to use 100% of the RRF
investment into the Scheme (taking into
account management fees).
M2C2-9
Investment 2.1
Strengthening
smart grids
Target
Smart grids-
Increase
network
capacity for
the
distribution of
renewable
energies
N/A Number 0 1 000 Q4 2024
Increase the network capacity for the
distribution of renewable energies by at least
1 000 MW
M2C2-17
Investment 3.4
Hydrogen testing
for railway
mobility and road
transport
Target
Number of
hydrogen
refuelling
stations built
N/A Number 0 29 Q2 2026
Works for the construction of at least 8
refuelling stations for railway based on
hydrogen along at least five railway lines and
for at least 21 hydrogen-based refuelling
stations for road transport, have been carried
out.
221
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone
/ Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
M2C2-19
Investment 3.5
Hydrogen
Research and
Development
Target
Number of
projects for
research and
development
on hydrogen
N/A Number 0 10 Q2 2026
Reports of completion of research activities
issued for at least 10 R&D projects in the
following areas;
a) Green hydrogen production
b) Hydrogen storage, transport and
transformation into derivates and e-fuels
c) Fuel cells
d) Integrated smart management for
intelligent hydrogen-based infrastructures
M2C2-24
Investment 4.2
Development of
Rapid Mass
Transport
systems
Milestone
Award of all
public
contracts for
the build-up of
infrastructure
for rapid mass
transport
systems
Notification of the
award of all public
contracts
N/A N/A N/A Q4 2023
Notification of the award of all public
contracts for the build-up of infrastructure
projects as defined in the description of the
measure.
M2C2-25
Investment 4.2
Development of
Rapid Mass
Transport
systems
Milestone
Award of all
public
contracts for
the purchase
of zero-
emission
rolling stock
and
Notification of the
award of all public
contracts
N/A N/A N/A Q3 2024
Notification of the award of all public
contracts for the purchase of at least 85 units
of rolling stock and at least 5 interventions
for the upgrade of the infrastructure of rapid
mass transport systems, as defined in the
measure description.
222
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone
/ Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
interventions
for the
upgrade of the
infrastructure
of rapid mass
transport
systems
M2C2-26
Investment 4.2
Development of
Rapid Mass
Transport
systems
Milestone
Public
infrastructure
and rolling
stock for rapid
mass
transport
Certificates issued N/A N/A N/A Q2 2026
- Administrative certificates issued for at least 186 km of public transport infrastructure in functional urban areas.
- Certificate of delivery or confirmation of acceptance accompanied by certificate of conformity for a least 311 units of zero-emission rolling stock (tramway, metro, trolleybus and bus) for mass rapid transport in functional urban areas.
- Administrative certificates issued for at least 10 upgrading interventions for the rapid mass transport infrastructure which may include their digitalisation. These interventions may include the upgrade of metro stations and of metro track infrastructure, signalling systems for railway or tramway, and public transit depots.
The investment shall not involve the
construction or upgrade of roads beyond the
223
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone
/ Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
scope of the intervention, unless these are
integral parts of the infrastructure enabling
the operation of zero-emission rolling stock.
M2C2-31
Investment 4.4.3:
Renewal fleet for
the National fire
brigade
command
Milestone
Award of all
public
contracts for
the renewal
fleet for the
National fire
brigade
command
Notification of the
award of all the
contracts for the
renewal fleet for
the National fire
brigade command
N/A N/A N.A Q2 2024
Notification of the award of all public
contracts for the acquisition of national fire
brigade vehicles.
M2C2-32
Investment 4.4.1:
Strengthening of
the regional
public transport
bus fleet with
zero-emission
low-floor buses
Milestone
Award of all
public
contracts for
the
strengthening
of the regional
public
transport bus
fleet with
zero-emission
low-floor
buses
Notification of the
award of all the
contracts
N/A N/A N/A Q4 2023
Notification of the award of public contracts
for the acquisition of at least 3 000 zero-
emission low-floor buses.
M2C2-34 Investment 4.4.1:
Strengthening of
the regional
Target Number of
zero-emission
low-floor
N/A Number 0 800 Q4 2024
Registration of at least 800 zero-emission
low-floor buses procured under M2C2-32 for
the strengthening of the respective fleet.
224
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone
/ Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
public transport
bus fleet with
zero-emission
low-floor buses
buses
registred T1
M2C2-34bis
Investment 4.4.2:
Strengthening of
the regional
public transport
railway fleet with
zero emission
trains and
universal service
Target
Number of
Zero Emission
trains
N/A Number 0 25 Q4 2024 Delivery of at least 25 Zero Emission trains.
M2C2-35
bis
Investment 4.4.2:
Strengthening of
the regional
public transport
railway fleet with
zero emission
trains and
universal service
Target
Number of
trains
procured
N/A Number 25 118 Q2 2026
Procurement or confirmation of acceptance
accompanied by the Declaration of
Conformity of at least 118 zero emission
trains. Eligible trains are electric, hydrogen
fuel cell and up to 20 bi-modal trains.
M2C2-38bis Investment 5.1.
Support to the
production
Milestone Implementing
Agreement Entry into force of
the Implementing N/A N/A N/A Q4 2024
Entry into force of the Implementing
Agreement.
225
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone
/ Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
system for the
Ecological
Transition, Net
Zero
Technologies,
and
competitiveness
and resilience of
strategic supply
chains
Agreement
M2C2-54 Investment 4.6 -
Diagnostic trains Target
Diagnostic
trains N/A Number 0 9 Q2 2026 Procurement of at least 7 diagnostic trains.
Equipment of at least 2 diagnostic trains.
M2C2-39
Investment 5.1
Support to the
production
system for the
Ecological
Transition, Net
Zero
Technologies,
and
competitiveness
and resilience of
strategic supply
chains
Milestone
The Ministry
of Enterprises
and Made in
Italy has
completed the
transfer of
funds to
Invitalia S.p.A
Certificate of
transfer N/A N/A N/A Q4 2024 Italy shall transfer EUR 3 500 000 000 to
Invitalia for the Facility.
M2C2-40 Investment 5.1. Milestone Amendment Entry into force of N/A 0 100 Q2 2026 Amendment of the implementing
226
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone
/ Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
Support to the
production
system for the
Ecological
Transition, Net
Zero
Technologies,
and
competitiveness
and resilience of
strategic supply
chains
implementing
agreement,
award
decision for
final
beneficiaries
and
investment
completion
amended
implementing
agreement,award
decision for final
beneficiaries and
certificate of
transfer
agreement.Italy shall transfer
EUR 227 000 000 to Invitalia for the Facility.
Invitalia shall have issued the award
decisions for an amount necessary to use
100% of the EUR 3 727 000 000 of RRF
investment (taking into account management
fees). At least 660 million EUR of this
financing shall contribute to climate
objectives using the methodology in Annex
VI of the RRF Regulation.
In particular:
-At least EUR 700 000 000 shall be allocated
to sub investment 1 Net Zero Technologies;
-The remaining RRF investment shall be
allocated to sub investment 2
Competitiveness and resilience of strategic
supply chains, including semi-conductor
projects. A maximum of EUR 400 000 000
under sub-investment 2 shall be allocated to
the agro-industrial and agri-food sectors.
M2C2-42bis
Investment 5.4 –
Equity injection
into the Green
Transition Fund
(“GTF”)
Milestone
Equity
injection into
the Green
Transition
Fund
Certificate of
transfer N/A N/A N/A Q4 2024
Italy shall transfer EUR 250 000 000 to the
GTF.
Moreover, the investment policy (“Accordo Finanziario”) shall be in line with the measure description.
227
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone
/ Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
M2C2-43
Investment 5.4:
Equity injection
into the Green
Transition Fund
(“GTF”)
Milestone Adoption of a
report
Adoption of a
report N/A N/A N/A Q2 2026
Italy shall transmit a report outlining the
actions taken by GTF to implement the
investment policy, including the steps taken
for the implementation of the financial
products that the equity is expected to
support, as well as the expected steps to be
taken for further implementing those
products.
The report shall also indicate the amounts
invested in direct/indirect manner and in
each financial product.
The Fund’s regulation shall be modified to
ensure that the investments of the Fund shall
be dedicated to green investments, aligned
with the intervention fields assigned a 100%
climate coefficient under Annex VI of
Regulation (EU) 2021/241.
M2C2-44
Investment 1.1
Development of
agri-voltaic
systems
Milestone
Award of all
public
contracts for
the installation
of photovoltaic
solar panels in
agri-voltaic
systems
Publication of the
admission
decrees with the
awarding
(assignment) of all
public contracts
for the installation
of photovoltaic
solar panels in
agri-voltaic
N/A N/A N/A Q4 2024
Publication of the admission decrees with the
awarding (assingment) of all public contracts
for the installation of photovoltaic solar
panels and measuring instruments in agri-
voltaic systems.
228
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone
/ Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
systems
M2C2-45
Investment 1.1
Development of
agri-voltaic
systems
Milestone
Implementing
agreement,
legal
agreements
signed with
final
beneficiaries
and
investment
completion
Entry into force of
implementing
agreement, legal
agreements
signed, certificate
of transfer
N/A N/A N/A Q2 2026
Entry into force of the implementing
agreement.
Italy shall transfer EUR 999 000 000 to the
GSE for the Facility.
The GSE shall have entered into legal grant
agreements with final beneficiaries for an
amount necessary to use 100% of the RRF
investment into the Scheme (taking into
account management fees).
M2C2-47
Investment 1.2
Promotion of
RES for energy
communities and
jointly acting
renewables self-
consumers
Milestone
Implementing
agreement,
legal
agreements
signed with
final
beneficiaries
and
investment
completion
Entry into force of
implementing
agreement, legal
agreements
signed and
certificate of
transfer
N/A N/A N/A Q2 2026
Entry into force of the implementing
agreement.
Italy shall transfer EUR 1 041 500 000 to the
GSE for the facility.
The GSE shall have entered into legal grants
agreements with the final beneficiaries for an
amount necessary to use at least 100% of
the RRF investment into the scheme (taking
in account management fees).
M2C2-48
Investment 3.1
Production of
Hydrogen in
brownfield sites
(Hydrogen
Milestone
Award of all
public contract
for the
projects the
production of
Notification of the
award of all the
public contracts
for the production
of hydrogen in
N/A N/A N/A Q1 2023
Award of the projects for the production of
hydrogen in abandoned industrial areas
centres. Funding shall be given to the
production of green hydrogen with less than
3 tCO2eq/tH2 to get the best result in terms
229
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone
/ Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
Valleys) hydrogen in
abandoned
industrial
areas centres
abandoned
industrial areas
centres
of decarbonisation This measure shall
support hydrogen production based on
electrolysis using renewable energy sources
as defined in the Directive (EU) 2018/2001
(renewable Directive) or grid electricity
M2C2-49
Investment 3.1
Production of
Hydrogen in
brownfield sites
(Hydrogen
Valleys)
Target Electrolysers
installed N/A Number 0 10 Q2 2026
Installation of 10 electrolysers of a capacity
of at least 1 MW each, within 10 hydrogen
valley projects.
Connection cost estimates accepted or paid
by the developer are issued for the
electrolysers requiring grid connection.
M2C2-50
Investment 3.2
Hydrogen Use in
hard-to-abate
industry
Milestone
Agreement to
promote the
transition from
methane to
green
hydrogen
Signature of the
agreement N/A N/A N/A Q1 2023
Signature of the agreement with the selected
project owners to promote the transition from
methane to green hydrogen. The projects
shall be in part dedicated to the R&D&I
process to develop and in part shall be
dedicated to the realisation and testing of an
industrial prototype, using hydrogen. This
measure shall support hydrogen production
based on electrolysis using renewable
energy sources as defined in the Directive
(EU) 2018/2001 (renewable Directive) or grid
electricity
M2C2-52 Investment 5.2
Hydrogen Milestone
Production of
electrolysers
Notification of the
publication of all
public contracts
N/A N/A N/A Q2 2022 Award of the contract to build an industrial
plant for the production of electrolysers.
230
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone
/ Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
M2C2-53 Investment 5.2
Hydrogen Target
Industrial
plant(s) built N/A Number 0 1 Q2 2026
Works for the construction of at least one
industrial plant for the production of
electrolysers or modular stack have been
carried out. The total aggregated
manufacturing capacity of the plant(s) shall
reach at least 890 MW/year.
231
F. MISSION 2 COMPONENT 3- Energy efficiency and requalification of buildings
Energy efficiency is the cornerstone of this component, which is organised across three main pillars.
• The first pillar is the introduction of a temporary incentive for energy and anti-seismic renovation
of private real estate, through a tax deduction of the costs incurred for the interventions. The
eligible interventions are those which increase the energy performance of the dwelling by at least
by two categories of the Energy Certificate, achieving on average an improvement in energy
consumption above 30%.
• The second pillar of this component is the improvement of the efficiency and safety of public
schools and judicial citadels.
• The third pillar is aimed at stimulating construction and expansion of efficient district heating
networks in urban areas.
In addition, there are a number of reforms to simplify and accelerate the implementation of projects
aimed at improving the energy efficiency of buildings.
This component is expected to strongly contribute to the achievement of Italy’s climate and energy
targets for 2030 as the civil sector is responsible for almost a half of total energy consumption in Italy.
Most buildings were built before the adoption of the criteria for energy saving and the entry into force
of the corresponding legislation, and so the needs in terms in terms of energy efficiency and
adaptation to seismic risks are significant.
This component addresses part of the 2020 country-specific recommendation 3 by which the Council
recommended Italy to take action to ‘Focus investment on the green and digital transition, in
particular on […] water management as well as reinforced digital infrastructure to ensure the
provision of essential services’. It also addresses parts the 2019 country-specific recommendations 3
(‘Focus investment-related economic policy on the quality of infrastructure, taking into account
regional disparities. […] and improve the effectiveness of public administration […] by accelerating
digitalisation, and by increasing the efficiency and quality of local public services’).
It is expected that no measure in this component does significant harm to environmental objectives
within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description of
the measures and the mitigating steps set out in the recovery and resilience plan in accordance with
the DNSH Technical Guidance (2021/C58/01).
F.1. Description of the reforms and investments for non-repayable financial support
Investment 2.1: Strengthening of the Ecobonus for energy efficiency
The objective of this measure is to support the energy renovation of residential buildings. The
measure consists in providing support in the form of a tax deduction or, as an alternative to the
instrument of tax deduction, in the form of financial instruments (so-called “credit transfer” and
“invoice discount”), to specific categories of organisations and households.
Reform 1.1- Simplification and acceleration of procedures for energy efficiency interventions
This reform aims to simplify and accelerate the procedures for the implementation of interventions
related to energy efficiency. It consists of four major actions:
• Launching of the national portal for the energy efficiency of buildings: The Portal shall
support citizens and operators in managing energy efficiency projects and shall be an easy source
for accessing information for decision-makers. It shall contain information on the energy
performance of the national building stock, which is expected to help firms and citizens in their
decisions of improving the energy performance of their property. A one-stop shop shall be set-up
to provide assistance and all useful information to citizens and businesses relating to energy
232
mapping of buildings, compliance with sector regulations, evaluation of the potential for
efficiency and selection of priorities for action, including redevelopment plans in stages, the
selection of the most appropriate promotional tools for the purpose, and the training of
professional skills.
• Strengthening of the activities of the information and training plan aimed at the civil sector -
The Information and Training Plan shall take into account the need to develop both specific
initiatives aimed at filling the information gap of end users in the residential sector, and
appropriate training activities on incentives and on the most effective interventions for companies
that offer energy services, that carry out interventions and for condominium administrators. The
Plan shall be developed taking into account the needs resulting from the Superbonus measure, in
order to maximize its effectiveness and lay the foundations for a lasting culture of efficiency in
construction.
• Updating and strengthening of the National Fund for energy efficiency: With the revision of
the regulations for the establishment and management of the National Energy Efficiency Fund
(Article 15 of Legislative Decree 102/2014, and Interministerial Decree of December 22, 2017)
amendments shall enter into force to foster the enhancement and greater use of available
resources.
• Accelerating the implementation phase of projects financed by the Central Public
Redevelopment Programme EPAC program: A regulatory review shall be carried out aimed at
promoting a more efficient management of resources specifically allocated to the Building
Requalification Programme of the Central Public Administration (PREPAC).
233
F.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Sequential Number
Related Measure (Reform or
Investment)
Milestone / Target
Name Qualitative
indicators (for milestones)
Quantitative indicators (for targets) Indicative timeline
for completion Description of each milestone and target
Unit of measure
Baseline Goal Quarter Year
M2C3-1
Investment 2.1- Strengthening of the Ecobonus for energy
efficiency
Milestone Entry into force of the
extension of the Superbonus
Provision in the legal act(s) indicating the
entry into force N/A N/A N/A Q4 2021
The legal act(s) shall extend the Ecobonus and ismabonus benefits until 31 December 2022 for condominiums and 30 June 2023 for social housing (IACP).
M2C3-2
Investment 2.1- Strengthening of the Ecobonus for energy
efficiency
Target Building renovation
Superbonus T1 N/A Number 0 17 000 000 Q2 2023
Complete building renovation for, (at least 17 000 000 square meters which result in primary energy savings of at least 40% and increasing at least two categories in the energy efficiency certificate.
M2C3-3
Investment 2.1- Strengthening of the Ecobonus for energy
efficiency
Target Building renovation
Superbonus T2 N/A Number 17 000 000 35 800 000 Q4 2025
Certifications (‘’asseverazioni’’) attesting building renovation for at least 35 800 000 square meters which result in primary energy savings of at least 40% increasing at least two categories in the energy efficiency certificate (Energy Performance Certification as defined by Decree 63/2013) shall be issued. In cases where gas-condensing boilers are installed as the chosen replacement of existing inefficient gas, coal and oil-based boilers, they shall have an A performance. The cost of installing gas-condensing boilers shall represent at most 20% of the overall renovation programme cost. The overall estimated energy saving generated by interventions amount to at least 191 Ktoe.
234
Sequential Number
Related Measure (Reform or
Investment)
Milestone / Target
Name Qualitative
indicators (for milestones)
Quantitative indicators (for targets) Indicative timeline
for completion Description of each milestone and target
Unit of measure
Baseline Goal Quarter Year
M2C3-4
Reform 1.1: Simplification and
acceleration of procedures for
energy efficiency interventions
Milestone
Simplification and acceleration of
procedures for energy efficiency interventions
Provision in the legal act(s) indicating the
entry into force N/A N/A N/A Q2 2022
The legal act(s) shall simplify and accelerate procedures for energy efficiency interventions by,
• Launching a national portal for the energy
efficiency of buildings
• Strengthening the activities of the
information and training plan aimed at the
civil sector
• Updating and strengthening the National
Fund for energy efficiency
• Accelerating the implementation phase of
projects financed by the PREPAC program
235
F.3. Description of the reforms and investments for the loan
Investment 1.1: Construction of new schools through building replacement
The objective of the measure is to create modern and sustainable school structures, in particular by reducing
energy consumption and increasing seismic safety. This measure consists in the construction of new schools.
Investment 1.2- Requalification of public real estate assets partly or wholly used by the administration
of justice
The objective of the measure is to requalify and modernise buildings partly or wholly used by the
administration of justice. The measure consists in the execution of renovation and requalifaction works in
real estate assets located in several Italian municipalities, including but not limited to energy efficiency
interventions.
Investment 3.1: Promotion of efficient district heating
The objective of the measure is to expand the use of efficient district heating, based on the distribution of
heat generated from renewable sources, from waste heat or cogenerated in high-performance plants. The
measure consists in financing projects relating to the construction of new, or the extension of existing, district
heating networks.
236
F.4. Milestones, targets, indicators, and timetable for monitoring and implementation for the loan
Sequential Number
Related Measure (Reform or
Investment)
Milestone / Target
Name Qualitative
indicators (for milestones)
Quantitative indicators (for targets) Indicative timeline
for completion Description of each milestone and target
Unit of measure
Baseline Goal Quarter Year
M2C3-5
Investment 1.1: Construction of new
schools through building replacement
Milestone
Award of all public contracts for the
construction of new schools through building replacement to upgrade
energy in school buildings, following a
public tendering procedure
Notification of the award of all public
contracts following a public tendering
procedure
N/A N/A N/A Q3 2023
Notification of the award of all public contracts on new schools building replacement eligible for funding formalised by local authorities equivalent to a total surface of at least 400 000 square meters
M2C3-6
Investment 1.1: Construction of new
schools through building replacement
Target Construction of new
schools N/A Number 0 166 Q2 2026
At least 166 new schools are built. The primary energy consumption of the 166 new schools shall be at least 20% lower than the Nearly Zero Energy Buildings requirement.
M2C3-7
Investment 1.2- Construction of
buildings, requalification and
strengthening of real estate assets of the
administration of justice
Milestone
Award of all public contracts to construct
new buildings, requalify and strengthen real estate assets of the
administration of justice are signed by the
contracting authority following a public
tendering procedure
Notification of the award of all public
contracts following a public tendering
procedure
N/A N/A N/A Q4 2023
Notification of the award of all public contracts on the construction of buildings, requalification and strengthening of real estate assets of the administration of justice.
M2C3-8
Investment 1.2- Requalification of public real estate assets partly or
wholly used by the administration of
justice
Target
Works for at least 289 000 square meters
of public real estate assets carried out
N/A Number 0 289 000 Q2 2026
Certificates of completion of works for at least 289 000 square meters of public real estate assets partly or wholly used by the administration of justice are issued.
237
Sequential Number
Related Measure (Reform or
Investment)
Milestone / Target
Name Qualitative
indicators (for milestones)
Quantitative indicators (for targets) Indicative timeline
for completion Description of each milestone and target
Unit of measure
Baseline Goal Quarter Year
M2C3-9 Investment 3.1:
Promotion of efficient district heating
Milestone
Contracts to improve the heating networks are
awarded by the Ministry of Ecological Transition
following a public tendering procedure
Notification of award of all public contracts
following a public tendering procedure
N/A N/A N/A Q4 2022
Award of all public contracts for the construction of new district heating networks or the extension of existing district heating networks, which should include the requirement of reducing energy consumption. Award of the contracts to the projects selected under the competitive calls for proposals in compliance with the ’Do no significant harm’ Technical Guidance (2021/C58/01) through the use of an exclusion list and the requirement of compliance with the relevant EU and national environmental legislation.
M2C3-10 Investment 3.1:
Promotion of efficient district heating
Target
Build or extension of networks for district
heating to reduce energy consumption
N/A KTOE 0 30 Q2 2026
Independent engineer report(s) issued certifying that
interventions have been carried out for the
construction of new networks for district heating, or
the extension of existing ones allowing for an energy
consumption reduction of at least 30 KTOE per year.
The investment shall comply with the conditions set
out in footnote (9) of the Annex VI of Regulation
241/2021/EU on the Recovery and Resilience Facility
To be eligible, district heating systems shall use heat generated from renewable sources, from waste heat or cogenerated in high performance plants as the main heat source. Fossil fuels shall solely be used as a back up.
238
G. MISSION 2 COMPONENT 4- Territorial planning and water resources
The aim of this component of the Italian recovery and resilience plan is to address a number of long-
lasting weaknesses related to the management of water resources and hydrogeological risks in Italy
and to adopt a number of measures aimed at preserving biodiversity. This is to be achieved through a
significant and balanced combination of reforms and investments in those various dimensions.
On the reforms side, the component proposes a set of measures aimed principally at improving the
efficiency in the management of water resources by reducing the fragmentation of the sector, by
establishing an adequate pricing policy and by setting a number of incentives to tackle the existing
problems related to wastewater management. Reforms in this component also include a set of
measures to simplify the design and implementation of projects related to water infrastructure and to
the management and reduction of hydrological risks.
The investments associated to this component shall contribute to mitigate and better manage the
hydrogeological risk in Italy, both from a prevention and adaptation perspective and shall aim to make
the infrastructure related to water more resilient. In addition, they aim to significantly improve the
management of water resources through better wastewater management and a significant reduction of
water leakages, including in the agricultural sector. The investments shall strengthen the digitalisation
of those sectors and shall make them more energy efficient and better adapted to climate change. This
component also incorporates a set of measures aimed at preserving biodiversity and green areas in line
with the EU 2030 “Biodiversity Strategy”.
This component addresses part of the 2 020 country-specific recommendation 3 by which the Council
of the European Union recommended Italy to take action to ‘Focus investment on the green and
digital transition, in particular on […] water managemnt as well as reinforced digital infrastructure to
ensure the provision of essential services’. It also addresses parts the 2019 country-specific
recommendation 3 (‘Focus investment-related economic policy on the quality of infrastructure, taking
into account regional disparities. […] and improve the effectiveness of public administration […] by
accelerating digitalisation, and by increasing the efficiency and quality of local public services’).
It is expected that no measure in this component does significant harm to environmental objectives
within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description of
the measures and the mitigating steps set out in the recovery and resilience plan in accordance with
the DNSH Technical Guidance (2021/C58/01).
G.1. Description of the reforms and investments for non-repayable financial support
Reform 2.1- Simplification and acceleration of the procedures for implementing interventions
against hydrogeological instability
The aim of this reform is to overcome the existing weaknesses in the governance of hydrogeological
risks highlighted by the Italian Court of Auditors. It shall consist of simplifying and accelerating
procedures for the implementation of projects in this area, including establishing maximum deadlines
for each phase; prioritising interventions in line with the National Risk Assessment and with Article 6
of the Decision 1313/2013 EU and Risk Management Capability Assessment and the Do No
Significant Harm principle; setting a plan to increase the administrative capacity of the entities
responsible for the implementation of these projects and reinforcing the coordination between the
various levels of government involved, including by streamlining the information flows.
Reform 2- Reform of the legal framework for a better management and a sustainable use of
water
This reform shall aim to address the long-lasting problems of the water sector in Italy, reflected in
many ongoing infringement procedures for non-compliance with the Council Directive 91/271/EEC,
in an excessive fragmentation of the sector and in the absence of adequate incentives and pricing
policies. The measures envisaged are expected to significantly reduce the fragmentation of the sector
239
by reducing the number of operators and encouraging economies of scale, setting incentives to reduce
water leakages and the excessive consumption of water by the agricultural sector and establishing
adequate pricing policies for a more sustainable consumption of water.
A set of Memoranda of Understanding (MoU) shall be signed with the regions Campania, Calabria,
Molise and Sicilia to reduce fragmentation in the number of operators providing water services. The
MoU shall set objectives in terms of setting Local Government Bodies, reducing the number of
operators and achieving economies of scale with a view to setting single operators for at least each
40 000 inhabitants within the two years following the signature of those MoU.
Reform 4.2 “Measures to ensure full managerial capacities for Integrated water services”
This reform aims to address major problems in the management of water resources and make the
system more efficient.
The system is expected to reduce the existing fragmentation in the number of operators, which
currently hinders an efficient use of water resources in some parts of the country. The reform is also
expected to set the right incentives for a better use of water resources in the agricultural sector, to
introduce a system of penalties for the illegal extraction of water and to introduce a system of prices
which reflects better and is more in line with the polluter-pays principle while avoiding the expansion
of existing irrigation systems. The measures shall be adopted in cooperation with the regions where
the management of water resources is more problematic at present.
Investment 3.2- Digitization of national parks and marine protected areas
The objective of the measure is to modernize and digitize procedures related to the functioning of
national parks and marine protected areas. The measure consists of digital services to visitors and
interventions in nature conservation and monitoring of natural resources.
Investment 4.2. Reduction of losses in water distribution networks, including digitization and
monitoring of networks
The objective of this investment is to reduce loss of drinking water. The measure consists in the
disctricting of water distribution networks.
Investment 3.1: Protection and enhancement of urban and peri-urban forests
The objective of this measure is to protect green areas and increase their number with the
objective of both preserving and enhancing biodiversity and increasing the quality of life of
the inhabitants of those areas. The measure consists in planting forest reproductive material
(seeds or plants) for at least 4 500 000 trees or shrubs and in transplanting at least 3 500 000
trees or shrubs, in 13 metropolitan areas of Italy.
240
G.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Sequential
Number
Related Measure
(Reform or Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
M2C4-1
Reform 2.1. Simplification
and acceleration of the
procedures for
implementing
interventions against
hydrogeological instability
Milestone
Entry into force of the
simplification of the
legal framework for a
better management of
hydrological risks
Provision in the
relevant legal
act(s) indicating
the entry into
force
N/A N/A N/A Q2 2022
The new legal framework shall (as
a minimum):
- Prioritise prevention
interventions in line with the
National Risk Assessment and with
Article 6 of the Decision 1313/2013
EU and Risk Management
Capability Assessment and the Do
No Significant Harm principle;
- Accelerate the procedures for
project design and set general
principles to simplify project
implementation and financing
procedures and hydrological risk
projects;
- Harmonise and streamline the
information flows to reduce
redundancy in reporting between
the various information systems of
the State and develop a system of
indicators for a better identification
of hydrological risks, in line with the
recommendations of the Italian
Court of Auditors.
241
Sequential
Number
Related Measure
(Reform or Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
- Reinforce the coordination of
interventions among different
government levels in line with the
recommendations of the Italian
Court of Auditors;
- Create joint databases on
incidents (‘dissesto’), in line with
the recommendations of the Italian
Court of Auditors;
- Establish maximum timelines
for each phase.
- Set a plan to strengthen the
capacity of the relevant entities.
M2C4-2
Reform 4.2 “Measures to
ensure full managerial
capacities for Integrated
water services”
Milestone
Entry into force of the
reform to ensure full
managerial capacities
for Integrated water
services
Provision in the
relevant legal
act(s) indicating
the entry into
force
N/A N/A N/A Q3 2022
The general Law / Regulations on
water services for their sustainable
use and incentivise investment in
water infrastructure, which at least
shall:
- Reduce fragmentation of
entities through rules and
aggregation mechanisms to
incentivise currently autonomous
managing operators to be
integrated into the unique operator
for the entire Ambito Territoriale
242
Sequential
Number
Related Measure
(Reform or Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
Ottimale;
- Provide for incentives for a
sustainable use of water in
agriculture. notably to support the
use of the common monitoring
system for water uses (SIGRIAN)
for collective and self-supply
irrigation uses;
- Set a system of regulated
prices that takes adequately into
account environmental resource
use and pollution in accordance
with the polluter-pays principle
M2C4-3
Reform 4.2 “Measures to
ensure full managerial
capacities for Integrated
water services”
Milestone
Reform of the legal
framework for a better
management and a
sustainable use of
water
Entry into force of
the Memoranda of
Understanding
(MoU)
N/A N/A N/A Q4 2021
Signature of Memoranda of
Understading (MoU) by the Ministry
of Ecological Transition with the
regions Campania, Calabria,
Molise and Sicilia to reduce
fragmentation in the number of
operators providing water services.
The MoU should set objectives in
terms of setting Local Government
Bodies, reducing the number of
operators and achieving
economies of scale with a view to
establish single operators for at
243
Sequential
Number
Related Measure
(Reform or Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
least each 40 000 inhabitants
M2C4-4
Reform 4.2 “Measures to
ensure full managerial
capacities for Integrated
water services
Milestone
Entry into force of
the new legal
framework of irrigation
purposes
Provision in the
relevant piece of
legislation
indicating the
entry into force
N/A N/A N/A Q2 2022
The revised legal framework shall
as a minimum,
-Establish a system of penalties for
the illegal extraction of water
Require an impact assessment as
in Article 4 (7) of the Water
Framework Directive to assess the
(possibly cumulative) impact on all
potentially affected water bodies.
-Ensure that that expansion of
existing irrigation system (including
through increased use of water, i.e.
not only physical expansion), even
via more efficient methods, is
avoided where the concerned
water bodies (surface or ground
waters) are, or projected (in the
context of intensifying climate
change) to be in less than good
status or potentially good status.
M2C4-5
Investment 3.2:
Digitization of national
parks
Milestone
Entry into force of the
administrative
simplification and
development of digital
services to visitors to
Provision in the
Ministerial Decree
on the entry into
force
N/A N/A N/A Q1 2022
The Ministerial Decree shall
mandate the development of digital
services for visitors to national
parks and marine protected areas.
244
Sequential
Number
Related Measure
(Reform or Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
national parks and
marine protected areas
M2C4-32
Investment 4.2. Reduction
of losses in water
distribution networks,
including digitization and
monitoring of networks
Milestone Districting in water
distribution networks
Monitoring reports
countersigned by
the independent
regulatory
authority ARERA
N/A N/A N/A Q4 2025
At least 35 monitoring reports
countersigned by the independent
regulatory authority ARERA have
been issued, confirming the
districting of at least 45 000
kilometres of water distribution
networks. Those monitoring reports
shall include the monitoring reports
issued for the fulfilment of M2C4-
31.
M2C4-20bis
Investment. 3.1:
Protection and
enhancement of urban
and peri-urban forests
Target Transplant trees or
shrubs T3 N/A Number 0 3 500 000 Q2 2026
Transplanting at least 3 500 000
trees or shrubs
245
G.3. Description of the reforms and investments for the loan
Reform 3.1 Adoption of national programs on air pollution control
The reform aims to align national and regional legislation, and to introduce related measures for the
reduction of emissions of air pollutants (in accordance with targets set by Directive 2016/2284 on national
emission ceilings and altering climate gases).
Investment 1.1: Implementation of an advanced and integrated monitoring and forecast system
The objective of this investment is to identify and predict risks stemming from climate change impact and
inadequate spatial planning, and to provide information for risk prevention plans. This investment consists in
the set-up of a monitoring system enabling the remote control of large territorial areas and the identification
of illegal disposal of waste.
Investment 2.1: Measures for flood and hydrogeological risk reduction
The objective of this measure is to tackle the hydrogeological instability in the Italian territory. The measure
consists in two lines of action, with Protezione Civile and“Commissioner of Emergency for the
reconstruction in the territories of Emilia Romagna, Tuscany, and Marche” affected by the May 2023 floods
(Commissario per la ricostruzione nel territorio della regione Emilia Romagna, Toscana e Marche), as
responsible Administration, respectively: the first line of action concerns a set of interventions to restore
damaged public structures and infrastructures (type E interventions) and reduce residual risk strictly
connected to the event and aimed primarily at protecting public and private safety (type D interventions); the
second line of action concerns interventions to restore waterways and increase protection against floods and
landslides and rehabilitation interventions of the transport network in the territories affected by the May 2023
floods.
Investment 3.1: Protection and enhancement of urban and peri-urban forests
The objective of this measure is to protect green areas and increase their number with the objective of both
preserving and enhancing biodiversity and increasing the quality of life of the inhabitants of those areas. The
measure consists in planting forest reproductive material (seeds or plants) for at least 4 500 000 trees or
shrubs and in transplanting at least 3 500 000trees or shrubs, in 13 metropolitan areas of Italy.
Investment 3.2- Digitization of national parks and marine protected areas
The objective of this measure is to modernize and digitize procedures related to the functioning of national
parks and marine protected areas. The measure consists of digital services to visitors and interventions in
nature conservation and monitoring of natural resources.
Investment 3.3- Re-naturification of the Po area
The objective of this measure is to reactivate natural processes and encourage the recovery of biodiversity in
the Po river area. The measure consists of the execution of interventions to reduce riverbed artificiality.
Investment 3.4: Remediation of orphan sites
The objective of this intervention is to reduce the environmental impact of ’orphan sites’ thus indirectly
promoting the circular economy. This investment consists in the adoption of an Action Plan for the
identification and revitalisation of orphan sites across Italian regions and autonomous provinces, as well as
the execution of specific interventions to restore them.
246
Investment 3.5: Restoration and protection of seabed and marine habitats
The objective of this measure is to contribute to reversing the degradation of seabed and marine habitats. The
measure consists in supporting projects mapping seafloor habitats and environmental monitoring, planning
and large-scale restoration and protection measures, and enhancing marine observation platforms.
Reform 4.1 Simplification of legislation and strengthening of governance for the implementation of
investments in the water supply infrastructures
The current regulatory framework and the existing fragmentation in the management has a negative impact
on the capacity for planning and implementing investments in water supply infrastructures.
The objective of this reform is to simplify and make more effective the legal framework and provide
assistance when necessary to the implementing bodies with insufficient capacity to undertake and complete
those investments within the timelines set originally.
The main measures planned to achieve those objectives are mainly through (i) the establishment of a central
public financing instrument for investments in the water sector which unifies resources which are rather
scattered at present; (ii) simplifying the procedures for reporting and monitoring of the investments financed,
(iii) further involving of the Regulator in the planning of the investments to be undertaken and in possible
revisions to the plan.
The Ministry of Infrastructure and Transport shall present the reform proposal relating to the water supply
sector.
Investment 4.1 Primary water infrastructure for the security of water supply
The aim of this measure is to ensure the security of water supply for important urban areas and large irrigated
areas, to increase safety and resilience of the network also with regard to transport capacity of water. The
measure consists in works on primary water infrastructure throughout the entire national territory.
Investment 4.2. Reduction of losses in water distribution networks, including digitization and
monitoring of networks
The objective of this investment is to reduce loss of drinking water. The measure consists in the distrcting of
water distribution networks.
Investment 4.3. Investments in the resilience of the irrigation agrosystem for better management of
water resources
The objective of this measure is to increase efficiency of irrigation systems through digitalisation and
infrastructural interventions for a more sustainable and climate change resilient agricultural sector.
Investment 4.4. Sewerage and purification
The objective of this measure is to reduce the weakness of the Italian water systems on sewerage and
purification of wastewater, as well as the number of agglomerations with weak sewerage and purification
systems. The measure consists in interventions concerning the sewerage and urban waste-water treatment
systems throughout the national territory.
Investment 4.5. Grant scheme for investments on water infrastructures
This measure shall consist of a public investment in a Grant Scheme, in order to incentivise private
investment and improve access to finance in Italy’s water management sector. The Scheme shall operate by
providing viability gap grants directly to the private sector as well as to public sector entities engaged in
similar activities.
The Scheme shall be managed by Invitalia S.p.A. as the implementing partner. The Scheme shall include the
following product line:
247
• A viability gap grant designed to cover the projects’ funding gap of the infrastructural projects in the
water management sector. The grant shall subsidize a portion of the overall investment, in order to
ensure the project’s bankability. The design of grant structure shall incentivize the rationalization and
aggregation of water service providers by putting in place a reward mechanism.
In order to implement the investment into the Scheme, Italy and Invitalia S.p.A. shall sign an Implementing
Agreement that shall include the following content:
1. Description of the decision-making process of the Scheme: The final award decision of the Scheme shall
be taken by an investment committee or other relevant equivalent governing body and approved by a
majority of votes from members who are independent from the government.
2. Key requirements of the associated grant policy,which shall include:
a. The description of the grants provided and eligible final beneficiaries. Final beneficiaries shall be,
in principle, companies with private participation. In line with the principle of non-discrimination,
public entities that are engaged in similar activities as the private entities benefiting from the
scheme could also be accepted as final beneficiaries.
b. The requirement that all investments supported are economically viable.
c. The requirement to comply with the ‘Do no significant harm’ (DNSH) principle as set out in the
DNSH Technical Guidance (2021/C58/01). In particular, the grant policy shall exclude the
following list of activities and assets from eligibility: activities and assets related to fossil fuels,
including downstream use71. Moreover, the associated grant policy shall include the requirement
to exclude from the financing: investments involving the construction of new dams; investments
in the scope of article 4(7) of Directive 2000/60 of the European Parliament and of the Council of
23 October 2000 establishing a framework for Community action in the field of water policy.
d. The requirement that final beneficiaries of the Scheme shall not receive support from other Union
instruments to cover the same cost.
3. The amount covered by the Implementing Agreement, the fee structure for the Implementing Partner and
the requirement to use any unused proceeds of the scheme, including beyond 2026, for the same policy
purposes.
4. Monitoring, audit, and control requirements, including:
a. The description of the implementing partner’s monitoring system to report on the grants mobilized.
b. The description of the implementing partner’s procedures that will ensure the prevention, detection
and correction of fraud, corruption, and conflicts of interests.
c. The obligation to verify the eligibility of every operation in accordance with the requirements laid
out in the Implementing Agreement before awarding a grant to an operation.
d. The obligation of carrying out risk-based ex-post audits in accordance with an audit plan of
Invitalia S.p.A. These audits shall verify i) that the control systems are effective, including the
detection of fraud, corruption, and conflict of interests; ii) compliance with the DNSH principle, the
State Aid rules, the climate target requirements; and iii) that the requirement that final beneficiaries
of the Scheme have not received support from other Union instruments to cover the same cost is
respected. The audits shall also verify the legality of the transactions and that the conditions of the
applicable Implementing Agreement and Grant Agreements are being respected.
71 Except for (a) assets and activities in power and/or heat generation, as well as related transmission and distribution
infrastructure, using natural gas, that are compliant with the conditions set out in Annex III of the ‘Do no significant
harm’ Technical Guidance (2021/C58/01).
248
5. Requirements for climate investments carried out by the implementing partner: at least
EUR 630 516 880,25 of the RRF investment into the Scheme shall contribute to the climate
change objectives in accordance with Annex VI to the RRF Regulation.72
72 Final beneficiaries associated to specific projects shall be required to provide a justification of the selected
intervention field for each project supported, together with a description of the project, for the purpose of the
computation of the climate contribution. For the purpose of the computation of the climate contribution, final
beneficiaries from equity, quasi-equity, corporate bonds or equivalent instruments not targeted to specific projects shall
provide a justification for the selected intervention field(s). The implementing partner shall also be required to provide
to the Member State a semi-annual report on the implementation of each project/activity.
249
G.4. Milestones, targets, indicators, and timetable for monitoring and implementation for the loan
Seq Number
Related Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators
(for milestones)
Quantitative indicators
(for targets)
Indicative
timeline for
completion Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
M2C4-6 Investment 3.2:
Digitization of national parks
Target
Development of digital services to visitors to national parks and marine protected areas
N/A Percentage 0 70 Q2 2024
At least 70% of national parks and marine protected areas have developed digital services for visitors to national parks and marine protected areas (at least two among: the connection to the Naturitalia.IT portal; an application for administrative procedures or a sustainable mobility app).
M2C4-6bis Investment 3.2:
Digitization of national parks
Milestone
Interventions related to nature
conservation and monitoring activities
Certificates issued
N/A N/A N/A Q2 2026
Conformity verification certificates issued for at
least 6 lots of nature conservation and/or
monitoring activities equipment, which shall
amount to a total of at least 12 000 equipment
items;
Administrative certificates confirming that at least 7 services for scientific and/or on-field monitoring activities have been carried out in natural parks and/or marine protected areas.
M2C4-7 Reform 3.1: Adoption of national programs
on air pollution control Milestone
Entry into force of a national air pollution control programme
Provision in the DPCM
indicating the entry into force
N/A N.A N/A Q4 2021
The Decree of the President of the Council of Minister (DPCM) shall set out a national air pollution control programme which introduces appropriate measures for the reduction of air pollution in line with the EU Directive 2016/2284 and the legislative decree 30 May 2018, n. 81, transposing that Directive.
M2C4-8
Investment 1.1. Implementation of an
advanced and integrated monitoring
and forecasting system
Milestone
Operational Plan for an advanced and
integrated monitoring and forecast system
to identify hydrological risks
Provision in the Ministerial
Decree indicating the
entry into force
N/A N/A N/A Q3 2021
The Ministerial Decree shall approve an
operational plan for the implementation of an
advanced and integrated monitoring and
forecasting system to identify hydrological risks.
It shall as a minimum:
Envisage remote sensing applications and data
250
Seq Number
Related Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators
(for milestones)
Quantitative indicators
(for targets)
Indicative
timeline for
completion Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
field sensors;
Develop a communication system which allows
coordinator and interoperability between the
various operators in the Control Rooms;
Set up Central and Regional Control Rooms;
Develop Cyber-security systems and services
M2C4-9
Investment 1.1. Implementation of an
advanced and integrated monitoring
and forecasting system
Milestone The monitoring and forecast system is
accessible
System accessible
online N/A N/A N/A Q2 2025
The monitoring and forecasting system to identify hydrological risks and illegal disposal of waste is accessible online.
M2C4-11
Investment 2.1.a. Measures for flood
and hydrogeological risk reduction –
Interventions in Emilia Romagna, Toscana
and Marche
Milestone
Identification of the interventions by
ordinance(s) of the Commissioner of
Emergency
Ordinance(s) of the
Commissioner of Emergency
Q3 2024
One or more ordinances by the Commissioner of Emergency shall identify the exact list of interventions to restore waterways and increase protection from floods and landslides, the interventions to restore public buildings, including public houses and health centres, and the total number of km of the transport network to be rehabilitated. The value of the total number of interventions shall amount to at least EUR 1.2 billion.
M2C4-11bis
Investment 2.1.a. Measures for flood
and hydrogeological risk reduction –
Interventions in Emilia Romagna, Toscana
and Marche
Target Interventions carried
out N/A Number 0 190 Q2 2026
Administrative certificates are issued confirming that at least 190 interventions to restore waterways and increase protection against floods and landslides, as well as rehabilitation interventions of the transport network, as identified by the Ordinances of the Commissioner of Emergency, have been carried out.
251
Seq Number
Related Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators
(for milestones)
Quantitative indicators
(for targets)
Indicative
timeline for
completion Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
M2C4-12
Investment 2.1.b. Measures for flood
and hydrogeological risk reduction
Milestone
Entry into force of the revised legal framework for
interventions against flood and
hydrogeological risks
Provisions in the Ordinances indicating the
entry into force
N/A N/A N/A Q4 2021
The decrees approving the first intervention and investment plan in the respective area (Commissioner delegate/ Region / Autonomous Province) for flood and hydrogeological risk reduction shall aim to restore the starting of the original conditions and ensure the resilience of the territories to natural disasters
M2C4-13
Investment 2.1b- Measures for flood
and hydrogeological risk reduction
Target Type D and type E
interventions carried out
N/A Percentage 0 90 Q2 2026
Administrative certificates are issued confirming that at least 90% of type E and type D interventions aimed at restoring damaged public structures as identified by approval acts of the National Civil Protection Service have been carried out.
M2C4-18
Investment. 3.1: Protection and
enhancement of urban and peri-urban forests
Milestone
Entry into force of the revised legal
changes for the protection and
valorisation of urban and peri-urban green
areas
Provision in the relevant pieces
of legislation indicating the
adoption of the urban
forestation plan
N/A N/A N/A Q4 2021
The urban forestation plan shall be in line with
the objectives of the law of 12 December 2019,
141 (‘climate law’) and following a planning
phase to be carried out by the metropolitan
cities. The plan should set as a minimum the
following objectives:
Preserve and enhance diffuse biodiversity in
line with the European Biodiversity Strategy,
Contribute to the reduction of air pollution in
metropolitan areas,
Reduce air quality infringement procedures;
Recover man-made landscapes and improve
protected areas present in the immediate
vicinity of metropolitan areas;
Curb soil consumption and restore useful soils.
M2C4-19 Investment. 3.1: Protection and
Target Plant trees for the
protection and N/A Number 0 1 650 000 Q4 2022 Plant at least 1 650 000 trees for reforestation
of urban and peri-urban areas pursuant to
252
Seq Number
Related Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators
(for milestones)
Quantitative indicators
(for targets)
Indicative
timeline for
completion Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
enhancement of urban and peri-urban forests
valorisation of urban and peri-urban green
areas T1
article 4 of the law of 12 December 2019, 141 (so-called climate law).
M2C4-20
Investment. 3.1: Protection and
enhancement of urban and peri-urban forests
Target
Plant trees for the protection and
valorisation of urban and peri-urban green
areas T2
N/A Number 1 650 000 4 500 000 Q4 2024
Planting of forest reproductive material (seeds or plants) for at least 4 500 000 trees and shrubs for reforestation of urban and peri-urban areas pursuant to article 4 of the law of 12 December 2019, 141 (so-called climate law).
M2C4-21 Investment 3.3 Re- naturification of Po
area Milestone
Revision of the legal framework for
interventions for the re-naturification of
the Po area
Provision in the relevant piece of legislation indicating the
entry into force
N/A N/A N/A Q2 2023
Entry into force of relevant legislation with the objective of recovering the ecological corridor represented by the riverbed, including natural reforestation and interventions for the restoration and reactivation of lateral branches and oxbows.
M2C4-22 Investment 3.3 Re- naturification of Po
area Target
Reduction of riverbed artificiality for the re- naturification of the
Po area T1
N/A Number 0 13 Q4 2024 Reduce riverbed artificiality by at least 13 km along the axis of the Po.
M2C4-23 Investment 3.3 Re- naturification of Po
area Target
Reduction of riverbed artificiality for the re- naturification of the
Po area T2
N/A Number 13 37 Q2 2026
Administrative certificates confirming the
reduction of riverbed artificiality by at least 37
km along the axis of the Po.
Administrative certificates confirming reforestation actions covering at least 337 hectares of riparian woodlands.
M2C4-24 Investment 3.4. Remediation of
“orphan-sites soil” Milestone
Legal framework for the remediation of
orphan sites
Provision in the relevant piece of legislation indicating the
adoption of the Action Plan
N/A N/A N/A Q4 2022
The Action Plan for the revitalisation of orphan
sites shall reduce land take and enhance urban
regeneration. It shall include as a minimum:
The identification of orphan sites in all 21
Regions and/or Autonomous Provinces
The specific interventions to be made in every
253
Seq Number
Related Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators
(for milestones)
Quantitative indicators
(for targets)
Indicative
timeline for
completion Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
orphan site to reduce land take and enhance urban regeneration
M2C4-25 Investment 3.4. Remediation of
“orphan-sites soil” Target
Revitalisation of orphan sites
N/A Number 0 4 441 544 Q2 2026
Act(s) certifying the conclusion of soil remediation procedures (as specified in art.5, comma 3 of the Action Plan) issued for at least 4 441 544 square meters of orphan sites listed in the Action Plan.
M2C4-26
Investment 3.5. Restoration and protection of the
seabed and marine habitats
Target Restoration and
protection of seabed and marine habitats
N/A Number 0 10 Q2 2025
The following 10 activities have been carried
out:
Oyster restoration sites have been placed in at
least one site for each of the following regions:
Friuli Venezia Giulia and Emilia Romagna;
Seabed and marine vegetation has been
planted in at least one site for each of the
following regions: Lazio, Campania, Calabria,
Sicilia;
Mooring fields equipped with buoys have been
installed in the areas of the Western, Central
and Southern Mediterranean;
Ghost nets have been removed in a total of at
least 15 sites located across Sicily, Campania,
Lazio, Puglia, Marche and Emilia Romagna;
Coastal radial stations have been maintained or
installed or equipped with elaboration software
in at least 9 locations, and a Mobile
Oceanographic Research Unit has been
purchased;
At least 12 wave measuring buoys have been
launched;
Maintenance or installation of new sensors has
254
Seq Number
Related Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators
(for milestones)
Quantitative indicators
(for targets)
Indicative
timeline for
completion Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
taken place in at least 25 tide gauge network
stations;
Installation of at least 3 new marine weather
stations and maintenance of at least 25 marine-
weather stations in the Venice Lagoon area;
At least 10 fixed stations for continuous
monitoring of chemical-physical and trophic
parameters in lagoons have been installed;
At least 5 observation software systems for the
monitoring of marine and coastal habitats have
produced data.
Any purchase of ships or vessels shall be of the best available technology with the lowest environmental impacts in the sector.
M2C4-27
Reform 4.1. Simplification of legislation and
strengthening of governance for the implementation of investments in the
water supply infrastructures
Milestone
Entry into force of the simplification of legislation for
interventions in primary water
infrastructure for the security of water
supply
Provision(s) in the relevant piece(s) of legislation
indicating the entry into force
N/A N/A N/A Q1 2022
The revised legislation shall strengthen the
governance and simplify the implementation of
investments in water supply infrastructure. The
new legal framework should as a minimum,
- Make the National Plan for interventions in the
water sector the central financing instrument for
investments in the water sector.
- Seek the opinion and actively involve the
Regulator (‘Autorità di Regolazione per Energia
Reti e Ambiente’) in any change or update to
the Plan.
- Provide support and accompanying measures
for implementing bodies not able to carry out
investments relating to primary procurement
within the foreseen time frame.
- Simplify procedures for reporting and
255
Seq Number
Related Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators
(for milestones)
Quantitative indicators
(for targets)
Indicative
timeline for
completion Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
monitoring the investments financed in the water sector.
M2C4-28
Investment 4.1. Investments in primary water infrastructures
for the security of water supply
Milestone
Award of funding to all projects for investments in primary water
infrastructure and for the security of water
supply
Publication of decree(s)
N/A N/A N/A Q3 2023
Publication of the admission decree(s) with the
awarding (assignment) of funding to projects for
investments in primary water infrastructure and
on the security of water supply.
The scope of the contracts shall be the
following,
Water supply security of important urban areas;
Structural works to increase safety and
resilience of the network, including adaptation
to climate change (excluding dams);
Increase of the transport capacity of water.
Selection criteria shall ensure that the
investment shall fully contribute to the climate
change objectives with a 40 % climate
coefficient, in accordance with Annex VI to the
Recovery and Resilience Facility Regulation
(EU) 2021/241.
M2C4-29
Investment 4.1. Investments in primary water infrastructures
for the security of water supply
Target
Administrative certificatesfor
interventions in water systems
N/A Number 0 45 Q1 2026
Administrative certificates have been issued
confirming that works have been completed for
interventions in at least 45 water systems (both
complex and elementary) of which at least 32
complex water systems.
M2C4-30
Investment 4.2. Reduction of losses in
water distribution networks, including
digitization and monitoring of networks
Milestone
Award of funding to all projects for
interventions in water distribution networks, including digitization
and monitoring of networks
Publication of decree(s)
N/A N/A N/A Q3 2023
Publication of the admission decree(s) with the
awarding (assignment) of funding to projects for
interventions for the modernization and
efficiency of the water distribution networks.
The scope of the contracts shall be the
following:
256
Seq Number
Related Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators
(for milestones)
Quantitative indicators
(for targets)
Indicative
timeline for
completion Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
Interventions to reduce losses in networks for
drinking water;
Increase the resilience of water systems to
climate change;
Strengthen the digitization of networks, for an optimal management of water resources, reduce waste and limit inefficiencies
M2C4-31
Investment 4.2. Reduction of losses in
water distribution networks, including
digitization and monitoring of networks
Target
Interventions in water distribution networks, including digitization
and monitoring of networks T1
N/A Number 0 14 000 Q4 2024 Districting at least 14 000 kilometres of water network
M2C4-33
Investment 4.3 Investments in the
resilience of the irrigation agrosystem
for better management of water resources
Milestone
Award of funding to all projects for the resilience of the
irrigation agrosystem for the better
management of water resources
Publication of decree(s).
N/A N/A N/A Q4 2023
Publication of the admission decree(s) with the
awarding (assignment) of funding to projects for
the interventions on the networks and irrigation
systems and on the related digitalisation and
monitoring system.
The scope of the contracts shall be the
following:
Encourage the measurement and monitoring of
uses on collective networks (through the
installation of meters and remote-control
systems), including the transition from self-
supply to collective uses as a prerequisite for
completing the introduction of water pricing
policy based on the water volumes for an
efficient use of water resources in agriculture
and as a consequence stimulating the
reduction of illegal water withdrawals in rural
areas.
257
Seq Number
Related Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators
(for milestones)
Quantitative indicators
(for targets)
Indicative
timeline for
completion Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
Irrigation investment should aim at making
existing irrigation more efficient, even if the
concerned water body is in good status.
It is expected that this measure does not do
significant harm to environmental objectives
within the meaning of Article 17 of Regulation
(EU) 2020/852, taking into account the
description of the measure and the mitigating
steps set out in the recovery and resilience plan
in accordance with the Do No Significant Harm
Technical Guidance
(2021/C58/01). In particular, for each
subinvestment, full compliance with the
requirements of EU law, including the Water
Framework Directive, shall be ensured before,
during and after the commencement of the
construction works.
Further, interventions, when applicable according to national law, shall be subject to an Environmental Impact Assessment (EIA) pursuant to Directive 2011/92/EU, as well as relevant assessments in the context of Directive 2000/60/EC and Directive 92/43/EEC, including the implementation of required mitigation measures.
M2C4-34
Investment 4.3 Investments in the
resilience of the irrigation agrosystem
for better management
Target
Interventions for the resilience of the
irrigation agrosystem for the better
management of
N/A Number 0 40 Q4 2024
At least 40 withdrawal sources (listed in
SIGRIAN) linked to water concession
(concessione di derivazione) with a capacity of
at least 100 l/s flow rate shall be equipped with
meters.
258
Seq Number
Related Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators
(for milestones)
Quantitative indicators
(for targets)
Indicative
timeline for
completion Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
of water resources water resources T1 The overall network efficiency interventions
shall also include the installation of:
300 third level meters;
10 000 fourth level meters;
Digitalisation and network improvements.
M2C4-34bis
Investment 4.3 Investments in the
resilience of the irrigation agrosystem
for better management of water resources
Target
Interventions for the resilience of the
irrigation agrosystem for the better
management of water resources T1.2
N/A Number 40 105 Q2 2026
At least 105 withdrawal sources (listed in
SIGRIAN) linked to water concession
(concessione di derivazione) with a capacity of
at least 100 l/s flow rate shall be equipped with
meters.
The overall network efficiency interventions
shall benefit at least 422 407 hectares of
irrigated area and include:
The installation of 750 third level meters;
The installation of 25 000 fourth level meters.
M2C4-35
Investment 4.3 Investments in the
resilience of the irrigation agrosystem
for better management of water resources
Target
Interventions for the resilience of the
irrigation agrosystem for the better
management of water resources T2
N/A Hectares 0 96 390 Q4 2024 At least 96 390 hectares of irrigated area shall benefit from an efficient use of irrigation resources.
M2C4-36
Investment 4.4 Investments in sewerage and
purification
Milestone Award of funding to
projects for sewerage and purification
Publication of a decree
N/A N/A N/A Q4 2023
Publication of the admission decree with the
awarding (assignment) of funding to the project
proposals.
The interventions shall,
Make the purification of wastewater discharged
into marine and inland waters more effective,
also by means of technological innovation;
Transform where possible some purification
plants into “green factories”, which reuse
259
Seq Number
Related Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators
(for milestones)
Quantitative indicators
(for targets)
Indicative
timeline for
completion Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
purified wastewater for irrigation and industrial
purposes.
This measure shall not do significant harm to environmental objectives within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description of the measure and the mitigating steps set out in the recovery and resilience plan in accordance with the DNSH Technical Guidance (2021/C58/01). In particular, the incineration of sludge shall not be eligible.
M2C4-38
Investment 4.4 Investments in sewerage and
purification
Target
Interventions for sewerage and urban
waste-water treatment
N/A Number 0 145 Q2 2026
Administrative certificates have been issued confirming that at least 145 interventions for sewerage and urban waste-water treatment have been carried out.
M2C4-39
Investment 4.5 Grant scheme for
investments on water infrastructures
Milestone Implementing
Agreement
Entry into force of the
Implementing Agreement
N/A N/A N/A Q2 2026 Entry into force of the Implementing Agreement.
M2C4-40
Investment 4.5 Grant scheme for
investments on water infrastructures
Target
Legal agreements signed with final beneficiaries and completion of the
investment
N/A Percentage
(%) 0% 100% Q2 2026
Invitalia S.p.A. shall have entered into legal
grant agreements with final beneficiaries for an
amount necessary to use 100% of the RRF
investment into the Scheme (taking into
account management fees). At least 40% of
this financing shall contribute to climate
objectives using the methodology in Annex VI
of the RRF Regulation.
Italy shall transfer EUR 1 576 292 200,62 to Invitalia S.p.A. for the Facility.
260
H. MISSION 3 COMPONENT 1: Sustainable transport infrastructure
H.1. Description of the reforms and investments for non-repayable financial support
N/A
H.2. Milestones, targets, indicators, and timetable for monitoring and
implementation for non-repayable financial support
N/Aa
H.3. Description of the reforms and investments for the loan
The investments in this component support the deployment of railway infrastructure (high-speed,
freight, regional railways, European Railways Traffic Management System). They are accompanied
by reforms to accelerate railway infrastructure investments and to improve the quality of road
infrastructure. The business environment reform component contains a measure creating additional
incentives for Regions to tender out their regional railway public service contracts. This component
contains measures to develop the use of hydrogen in railways.
This component support addressing the 2019 country-specific recommendation 3 urging Italy to
‘Focus investment-related economic policy on […] the quality of infrastructure taking into account
regional disparities’ and the 2020 country-specific recommendation 3 on ‘Front-load mature public
investment projects’ and to ‘Focus investment on the green and digital transition, in particular on
clean and efficient production and use of energy, research and innovation, sustainable public transport,
waste and water management as well as reinforced digital infrastructure to ensure the provision of
essential services’.
It is expected that no measure in this component does significant harm to environmental objectives
within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description of
the measures and the mitigating steps set out in the recovery and resilience plan in accordance with
the DNSH Technical Guidance (2021/C58/01).
Reform 1.1 - Acceleration of the approval process of the Contract between the Ministry of
Infrastructure and Transport (MIT) and the railway infrastructure manager Rete Ferroviaria
Italiana
This reform consists in removing the requirement that Parliamentary Commissions express an opinion
on the list of investments of the Contratti di Programma (CdP) of the railway infrastructure manager
Rete Ferroviaria Italiana. The Parliamentary Commissions shall express an opinion on the strategic
programme of investments.
Reform 1.2 - Acceleration of the authorization process of projects
This reform consists in adopting legislation allowing to anticipate the indication of the place of works
at the time of the “Economic Technical Feasibility Project” (PFTE), instead of waiting for the
definitive project design phase. Additional authorizations, which cannot be acquired on the PFTE,
would be obtained in subsequent project design phases, without convening the “Conferenza dei
Servizi”, as an exception to Law no. 241/1990. These changes shall reduce the authorisation time of
projects from 11 to 6 months.
Reform 1.3 - Boosting the efficiency of railway infrastructure in Italy
This reform aims at promoting an increase in competition in regional and intercity railway transport
markets, including by paving the way for a timely launch – in accordance with legislation – of the
tender for the Intercity public service contract, to improve the infrastructural planning for railway
261
lines and networks, and to introduce performance measurement of railway infrastructural management
and investments. The reform consists in the entry into force of legislation and/or legal act(s).
Investment 1.1 - High-speed railway lines in the Centre and South
The objective of this investment is to expand the Italian railway infrastructure. This investment
consists in carrying out railway works on the high-speed railway infrastructure for passengers and
freight on the Napoli-Bari, Salerno-Reggio Calabria, Palermo-Catania, Orte-Falconara and Taranto-
Metaponto-Potenza-Battipaglia lines.
Investment 1.2 - High-speed lines in the North
The objective of this investment is to expand the Italian railway infrastructure. This investment
consists in carrying out railway works on the high-speed railway infrastructure for passengers and
freight on the Brescia-Verona-Vicenza-Padova, and Liguria-Alpi lines.
Investment 1.4 - European Rail Transport Management System (ERTMS)
The objective of this investment is to contribute to the adaptation of the Italian railway infrastructure
to European interoperability standards. This investment consists in equipping 2 785 km of railway
lines with the European Rail Transport Management System (ERTMS) at an infrastructural and/or
technological level.
Investment 1.8 - Upgrading railway stations
The objective of this investment is to make railway stations more accessible for persons with
disabilities and persons with reduced mobility. This investment consists in upgrading 73 railway
stations.
Investment 1.10 - Strengthening metropolitan nodes and regional railway lines
The objective of this investment is to ameliorate the quality of the Italian inter-regional, and regional
railway lines. This investment consists in upgrading at least 3 309 km of railway lines, including
1 162 km in the South. Projects belonging to this measure may receive support from other European
programmes.
Reform 2.1 - Adoption of “Guidelines for the classification and management of risks, the
evaluation of security and the monitoring of existing bridges”
This reform consists in adopting guidelines for the classification and management of risks, the
evaluation of security and the monitoring of existing bridges. The adoption of "Guidelines", which
shall allow the application of common standards and methodologies on the entire national road
network.
Reform 2.2 - Transfer the property of the bridges and viaducts from the lower level ranking
roads to the higher ranking ones
This reform consists in the transfer of the ownership of the bridges, viaducts and overpasses from the
lower type roads to the higher type roads (motorways and main suburban roads) allowing an increase
in the overall safety of the road network, as the bridges, viaducts and overpasses shall be maintained
by ANAS and/or the motorway concessionaires, who have better planning and maintenance capacities
than the individual municipalities or provinces.
262
H.4. Milestones, targets, indicators, and timetable for monitoring and implementation for the loan
Seq
Number
Related Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators
(for milestones)
Quantitative indicators
(for targets) Indicative timeline
for completion Description of each milestone and target Unit of
measure Baseline Goal Quarter Year
M3C1-1
Reform 1.1 - Acceleration of the approval process of the Contract between the MIT and RFI
Milestone
Entry into force of a legislative amendment on the approval process of the Contratti di Programma (CdP)
Provision in the law indicating the entry into force of the legislative amendment on the approval process of Contratti di Programma
N/A N/A N/A Q4 2021 The legislative amendment shall reduce the time for the approval process of the Contratti di Programma (CdP) of the railway infrastructure manager Rete Ferroviaria Italiana
M3C1-2
Reform 1.2 - Acceleration of the authorization process of projects
Milestone
Entry into force of a regulatory change that reduces the authorisation time of projects from 11 to six months
Provision in the law indicating the entry into force of the regulatory change that reduces the authorisation time from 11 to six months.
N/A N/A N/A Q4 2021 The regulatory change shall reduce the authorisation time of projects from 11 to six months
M3C1-3
Investment 1.1 - High- speed railway connections to the South for passengers and freight
Milestone
Award of the contract (s) to build high-speed railway in the lines Napoli-Bari, and Palermo-Catania
Notification of the award of all public contracts to build high-speed railway in the lines Napoli- Bari and Palermo- Catania
N/A N/A N/A Q4 2022
Notification of the award of all public contracts to build high-
speed railway in the lines Napoli-Bari, and Palermo-Catania
in full compliance with the public procurement rules
The contract (s) shall refer to the following parts of those
lines:
Napoli-Bari line: Orsara- Bovino
Palermo-Catania line: Catenanuova - Dittaino and Dittaino – Enna
M3C1-4
Investment 1.1 - High- speed railway connections to the South for passengers
Milestone
Award of the contract to build high-speed railway in the lines
Notification of the award of the multidisciplinary contract to build
N/A N/A N/A Q4 2023 Notification of the award of the multidisciplinary contract to
build high-speed railway in the line Salerno Reggio
263
Seq
Number
Related Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators
(for milestones)
Quantitative indicators
(for targets) Indicative timeline
for completion Description of each milestone and target Unit of
measure Baseline Goal Quarter Year
and freight Salerno Reggio Calabria
high-speed railway in the line Salerno- Reggio Calabria
Calabria.
The contract shall refer to the following parts of this line: Battipaglia - Romagnano
M3C1-6
Investment 1.1 - High- speed railway lines in the Centre and South
Target
High-speed rail in the lines Napoli- Bari, Salerno- Reggio Calabria, Palermo-Catania, Orte-Falconara Taranto- Metaponto- Potenza- Battipaglia.
N/A Number 0 97.5 Q2 2026
Certificates confirming thecompletion of works for the
construction of 67.5 km of high-speed rail.
For railway lots Bicocca-Catenanuova (Palermo-Catania
line), Cancello-Frasso (Napoli-Bari line) and Napoli-
Cancello (Napoli-Bari line), only kilometres for which works
have been carried out after 30 September 2023, according
to the WBS methodology shall be considered.
Certificates confirming that, according to the WBS
methodology, additional 30 km of civil works have reached
100% of work progress.
The assessment and authorisation of each relevant project/investment shall respect all the rules and procedures set in Articles 6.3 and 6.4 of the EU Directive 92/43/CEE and follow the national guidelines for Impact Assessment published in the Official Gazzette of the Italian Republic N°303 of 28 December 2019.
M3C1-9
Investment 1.2 - High- speed lines in the North
Target
High-speed rail in the lines Brescia- Verona-Vicenza- Padova; Liguria- Alpi.
N/A Number 0 137.5 Q2 2026
Certificates confirming thecompletion of works for the
construction of 108,6 km of high-speed rail.
Certificatesconfirming that, according to the WBS
methodology, additional 28.9 km of civil works have
reached 100% of work progress.
The assessment and authorisation of each relevant
project/investment shall respect all the rules and
procedures set in Articles 6.3 and 6.4 of the EU Directive
264
Seq
Number
Related Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators
(for milestones)
Quantitative indicators
(for targets) Indicative timeline
for completion Description of each milestone and target Unit of
measure Baseline Goal Quarter Year
92/43/EEC and follow the national guidelines for Impact
Assessment published in the Official Gazzette of the Italian
Republic N°303 of 28 December 2019.
M3C1-10 Investment 1.3 - Diagonal connections
Milestone
Award of the contract (s) to build the connections in the lines Orte- Falconara and Taranto - Metaponto- Potenza- Battipaglia
Notification of the award of the multidisciplinary contract to build high-speed railway in the lines Orte- Falconara and Taranto - Metaponto- Potenza-Battipaglia
N/A N/A N/A Q1 2024
Notification of the award of the multidisciplinary contract to
build the connections in the lines Orte-Falconara and
Taranto -Metaponto-Potenza-Battipaglia.
The contract (s) shall refer to the following lines:
Orte-Falconara
Taranto -Metaponto-Potenza-Battipaglia
M3C1-12
Investment 1.4 - Introducing the European Rail Transport Management System (ERTMS)
Milestone
Award of the contracts for the European Rail Transport Management System
Notification of the award of all public contracts to introduce the European Rail Transport Management System
N/A N/A N/A Q4 2022 Notification of the award of all public contracts to introduce the European Rail Transport Management System (ERTMS)
M3C1-14
Investment 1.4 - Introducing the European Rail Transport Management System (ERTMS)
Target
2785 km of railways equipped with the European Rail Transport Management System at an infrastructural and/or technological level.
N/A Number 0 2 785 Q2 2026 Certificates confirming that 2 785 km of railways are equipped with the European Rail Transport Management System at an infrastructural and/or technological level.
265
Seq
Number
Related Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators
(for milestones)
Quantitative indicators
(for targets) Indicative timeline
for completion Description of each milestone and target Unit of
measure Baseline Goal Quarter Year
M3C1-15
Investment 1.5- Strengthening metropolitan nodes and key national links
Target
700 km of upgraded line sections built on metropolitan nodes and key national links
N/A Number 0 700 Q4 2024 At least 700 km of upgraded line sections built on metropolitan nodes and key national links, ready for authorisation and operational phases.
M3C1-17
Investment 1.7 - Upgrading, electrification and resilience of railways in the South
Target
172 km of works completed related to the resilience of railways in the South, ready for the authorisation and operational phases.
N/A Number 0 172 Q4 2023
Completion of works for at least 172 km, related to the
resilience of southern railways, ready for the authorisation
and operational phases.
The 172 km refer the following lines:
• Paola- Reggio Calabria;
• Lentini Diramazione-Gela;
• Messina – Catania – Siracusa;
• Caserta – Battipaglia;
• Roma – Napoli; and
• Bari – Brindisi.
The target shall be achieved through CLPs (i.e. “Codice Locale Progetto”) that are not supported by EU funds other than the RRF.
M3C1-19
Investment 1.8 - Upgrading railway stations (RFI management; in South)
Target Upgraded and accessible railway stations
N/A Number 0 10 Q4 2024 Ten railway stations are upgraded and accessible in line with Commission Regulation 1300/2014.
M3C1-20 Investment 1.8 - Upgrading railway
Target Upgraded railway stations
N/A Number 10 73 Q2 2026 Certificates confirming the upgrade of 73 railway stations.
266
Seq
Number
Related Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators
(for milestones)
Quantitative indicators
(for targets) Indicative timeline
for completion Description of each milestone and target Unit of
measure Baseline Goal Quarter Year
stations
M3C1-21
Reform 2.1 - Implementation of the recent “Decree Simplification” (converted into Law n.120 dated 11 September 2020) by issuing a decree concerning the adoption of “Guidelines for the classification and management of risks, the evaluation of security and the monitoring of existing bridges”
Milestone
Entry into force of “Guidelines for the classification and management of risks, the evaluation of security and the monitoring of existing bridges”
Provision in the decree indicating the entry into force of the decree adopting the “Guidelines for the classification and management of risks, the evaluation of security and the monitoring of existing bridges”
N/A N/A N/A Q4 2021
The “Guidelines” shall set common standards and methodologies on the entire national road network for the classification and management of risks, the evaluation of security and the monitoring of existing bridges.
M3C1-22
Reform 2.2 - Transfer the property of the bridges and viaducts from the lower level ranking roads to the higher ranking ones
Milestone
Transfer the ownership of the bridges, viaducts and overpasses from the lower level ranking roads to the higher ranking ones (highways and main national roads)
Provision in the relevant legal act referring to the entry into force of the transfer of ownership of the bridges, viaducts and overpasses from the lower level ranking roads to the higher ranking ones (highways and main national roads)
N/A N/A N/A Q4 2021
The transfer of ownership of the works of art shall have to take place within six months of the entry into force of Law 120/20. It is expected to be completed according to the rules of the Codice della Strada (Legislative Decree 285/1992) and its Regulations (Presidential Decree 495/92), which dictate provisions on the transfer of ownership between road-owning entities.
267
Seq
Number
Related Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators
(for milestones)
Quantitative indicators
(for targets) Indicative timeline
for completion Description of each milestone and target Unit of
measure Baseline Goal Quarter Year
M3C1-26
Reform 1.3 – Boosting the efficiency of railway infrastructure in Italy
Milestone
Entry into force of legislation and/or legal act(s)
Provision(s) in the legislation and/or legal act(s) referring to the entry into force
N/A N/A N/A Q2 2026
Entry into force of legislation and, where necessary, other
legal act(s), as specified below.
Part 1 - Efficiency and performance of public investment:
The legislation shall envisage the adoption of a multi-annual
strategic document by the Ministry of Infrastructure and
Transport to steer Italy’s multi-annual infrastructural
planning for at least 10 years. The document shall promote
multimodal transport, and fully integrate the industrial needs
of the corporate sector into infrastructural planning (for
example, by prioritizing investments which link key
industrial areas and logistic hubs to the transport network).
The reform provides for the review of the infrastructural
planning documents. More specifically, the legislation shall:
o Ensure that the Contratto di Programma, the rail
infrastructure development strategy and the
infrastructural manager’s business plan are drafted in
line with the objectives of the Ministry of Infrastructure
and Transport’s multi-annual strategic document and
are compliant with the Directive 34/2012/EU.
o Introduce as a part of the Contratto di Programma
approval process an opinion - according to the national
law - of the regulatory body (Autorità di regolazione dei
trasporti, ART) on the Mobility Strategic Document
(Documento strategico della mobilità ferroviaria di
passeggeri e merci) (as defined by the Italian law. no.
233 of 2021 - Art. 5 comma 1, lett. a). The opinion
shall also assess the consistency of planned
investments with market needs gathered with the
coordination mechanisms referred to in article 7e of
268
Seq
Number
Related Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators
(for milestones)
Quantitative indicators
(for targets) Indicative timeline
for completion Description of each milestone and target Unit of
measure Baseline Goal Quarter Year
Directive 2012/34/EU.
o Introduce for the new Contratto di Programma a
system of milestones and targets and corresponding
deadlines, as well as performance indicators and
quality criteria. Indicators and quality criteria shall be
set in accordance with Annex V of Directive
2012/34/EU. The bonus identification system for the
managers of Rete Ferroviaria Italiana (RFI) shall be
compliant with article 7 (4) of Directive 2012/34/EU
and must take into consideration the achievement of
milestones and targets and the results obtained with
respect to performance indicators included in the
Contratto di Programma.
o Empower the regulatory body (ART) with the
identification, in agreement with MIT, of the
performance indicators that shall be attached to the
Contratto di Programma.
o Empower the regulatory body (ART) to monitor the
achievement of the milestones and targets, and the
fulfilment of performance indicators contained in the
Contratto di Programma
Require the Ministry of Infrastructure and Transport to carry
out an in-depth cost benefit analysis of major investments
(investments larger than EUR 50 million) included in the
Contratto di Programma. The unit costs used in the analysis
shall be benchmarked against international benchmarks for
different categories of infrastructural railway investments
and shall be in line with the EU and national guidelines on
cost benefit analysis. The results of the analysis shall be
open for consultation of interested parties before the
adoption of the contractual agreements, and shall be
269
Seq
Number
Related Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators
(for milestones)
Quantitative indicators
(for targets) Indicative timeline
for completion Description of each milestone and target Unit of
measure Baseline Goal Quarter Year
published once adopted.
Part 2 - Competition:
The legislation shall strengthen the powers of the regulatory
body (ART) as regards public service contracts in the
railways sector. ART shall be empowered to monitor and
issue opinions on the scoping and awards (for direct and in-
house awards and awards to internal operators) of public
service contracts in the railways sector, including as
regards the identification of the optimal dimension of
efficient lots within and between Regional borders.
The legislation shall extend the application of Article 9 of
Law 118/2022 (Competition Law), including conformity with
ART regulatory acts, and of Article 27, par. 2, let c) of
Decree-Law n. 50 of 24/04/2017 to all direct and in-house
awards and awards to internal operators according to
Regulation 1370/2007. For intercity services, in case of
direct or in-house awards and awards to internal operators
according to Regulation 1370/2007, the legislation shall
extend the principles included in Articles 17, 30 and 31 of
Legislative Decree n. 201/2022. The legislation shall
establish that any decision to prolong Public Service
Obligations (PSO) contracts, properly reasoned in
compliance with Regulation 1370/ 2007, shall be subject to
principles of transparency obligations for in house awards
included in Article 31 of Legislative Decree n. 201/2022.
The legislation shall envisage the start of the competitive
tender of the intercity public service contract(s). The
legislation shall envisage that the tender shall include a
redefinition of its scope in line with the methodology
270
Seq
Number
Related Measure
(Reform or
Investment)
Milestone/
Target Name
Qualitative
indicators
(for milestones)
Quantitative indicators
(for targets) Indicative timeline
for completion Description of each milestone and target Unit of
measure Baseline Goal Quarter Year
established by the rail regulatory body following a market
test as explained in section 2.2.3 of the Commission
Interpretative Guidelines on Regulation 1370/2007. The
legislation shall also require that the contract shall be
divided into appropriate, contestable lots based on the
relevant criteria indicated by ART.
For the intercity service, the legislation shall require the
Ministry of Infrastructure and Transport to make rolling
stock owned by the State available to incoming operators
selected through competitive tendering procedures, under
transparent and non-discriminatory access conditions.
For regional railway services, the legislation shall require
regions to transmit to the Ministry of Infrastructure and
Transport updated and complete data and information
concerning the rolling stock available for public service
contracts for rail transport, including the related state of
maintenance. The legislation shall also envisage the
publication of a yearly report by the Ministry of
Infrastructure and Transport on the rolling stock available to
the regional administrations.
The legislation shall encourage the carve-out and the
competitive tendering of sub-lots from existing contracts (to
the extent possible based on existing provisions in ongoing
contracts).
M3C1-28
Investment 1.10 Strengthening metropolitan nodes, inter-regional and regional railway lines
Target 3 309 km of upgraded railway lines
N/A Number 872 3 309 Q2 2026
Certificates confirming the upgrade of at least 3 309 km for
the railway lines indicated in the Interministerial Decree
MIT/MEF 23 May 2024, n. 148.
271
272
MISSION 3 COMPONENT 2- Intermodality and integrated logistics
The objective of this component of the Italian recovery and resilience plan is to make Italian ports
more efficient and competitive, more energy efficient and better integrated to the logistic chain. It also
aims to digitalise the air traffic management system.
For that purpose, it includes on one hand important reforms to simplify processes, to update the port
planning and to make concessions in Italian ports more competitive. On the other some investments
designed to ensure intermodality with the broad lines of European communication developing links
with ocean and inter-Mediterranean trafficking, increasing dynamism and the competitiveness of the
Italian port system, also with a view to reducing greenhouse emissions. The investments linked to this
component are expected to substantially increase passenger and freight volumes in Italian ports with a
positive effect on the stimulating economic activities in the respective areas and on the national
economy as a whole.
On the other hand, this component relates to the digitalisation of logistics systems, including airport
systems. It is expected to make these sectors more competitive by using innovative technological
solutions to make the system more efficient and also to reduce their environmental impact.
This component addresses the 2019 country-specific recommendation 3 urging Italy to ‘Focus
investment-related economic policy on the quality of infrastructure’ and the 2020 country-specific
recommendation 3 recommending to ‘Focus investment on the green and digital transition, in
particular on clean and efficient production and use of energy, research and innovation, sustainable
public transport, waste and water management as well as reinforced digital infrastructure to ensure the
provision of essential services’.
It is expected that no measure in this component does significant harm to environmental objectives
within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description of
the measures and the mitigating steps set out in the recovery and resilience plan in accordance with
the DNSH Technical Guidance (2021/C58/01).
I.1. Description of the reforms and investments for non-repayable
financial support
Reform 1.1- Simplification of procedures for the strategic planning process
This measure envisages the update of port planning to ensure a strategic vision of the Italian ports
system. The reform shall regulate as a minimum the (i) the development objectives of the port system
authorities; (ii) the areas identified and outlined intended for strictly port and rear-port functions, (iii)
the last-mile infrastructural connections of road and rail with ports, (iv) the criteria followed in
identifying the contents of the planning and (v) it shall make an unambiguous identification of the
guidelines, the rules and the procedures for the preparation of the port regulatory plans.
Reform 1.2- Competitive award of concessions in Italian ports
The aim of this measure is to define conditions relating to the duration of the concession, the
supervisory and control powers of the granting authorities, the renewal procedures, the transfer of the
facilities to the new concessionaire at the end of the concession and the identification of the minimum
limits of the fees charged to the concessionaires.
Reform 1.3- Simplification of authorisations for procedures of authorisation of cold ironing in
Italian ports
273
This measure is expected to simplify and reduce the authorization procedure concerning construction
of the National Electricity Transmission Network plants to power the distribution systems for the
supply of electricity to ships (cold ironing).
The Ministry of Infrastructure and Transport shall make a proposal to streamline the authorization
process. In particular, it shall be proposed to have the cold ironing projects evaluated by the territorial
offices that report to the Ministry of Economic Development, which could, in a shorter time, study the
projects and consequently authorize them. Moreover, in terms a regulatory intervention shall be
envisaged to identify a single authorization process for projects involving a voltage higher than 132
kV and the rest, in order to exploit the process synergies.
Reform 2.1: Implementation of a Single Customs Window (“Sportello Unico Doganale”)
The objective is to create a dedicated portal for the Single Control Desk, which shall enable
interoperability with national databases and coordination of control activities by customs.
Investment 2.1: Digitalisation of the logistic chain
The objective of this investment is to increase the competitiveness of the national logistics by
simplifying procedures, processes and controls and focusing on the de-materialisation of documents
and the exchange of data and information. This investment consists in the creation of an interoperable
digital system between public and private actors for freight and logistics.
Investment 2.3: Cold ironing
The objective of this investment is to reduce greenhouse gas emissions of the maritime sector. This
investment consists in building cold ironing infrastructure for the supply of electricity in ports and the
related connection infrastructure to the national transmission grid.
274
I.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone
/ Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline for
completion
Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
M3C2-1
Reform 1.1-
Simplification of
procedures for
the strategic
planning
process
Milestone
Entry into force
of legislative
modifications
related to the
simplification of
the procedures
for the strategic
planning
process
Provision in the
legal act(s)
indicating the
entry into force of
the legislative
modifications
related to the
simplification of
the procedures
for the strategic
planning process
N/A N/A N/A Q4 2022
The revised legislative framework shall set out
that,
- All port authorities shall adopt their System
Strategic Planning Documents (DPSS) and
their Port Regulatory Plans (PRP) fully taking
into account the reform of Italian ports
systems of 2016 as approved by the
Legislative Decree N° 169 of 4 August 2016.
The DPSS shall as a minimum regulate the
following elements:
-The development of the objectives of the port
system authorities;
-The areas identified and outlined intended for
strictly port and rear-port functions,
-The last-mile infrastructural connections of
road and rail with ports,
-The criteria followed in identifying the
contents of the planning,
-Make an unambiguous identification of the
guidelines, the rules and the procedures for
the preparation of the port regulatory plans.
275
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone
/ Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline for
completion
Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
M3C2-2
Reform 1.2-
Competitive
award of
concessions in
Italian ports
Milestone
Entry into force
of the
Regulation on
port
concessions
Provision in the
Regulation
indicating the
entry into force of
the Regulation on
port concessions
N/A N/A N/A Q4 2022
The new Regulation shall define the
framework conditions for the award of the
concessions in ports. The Regulation shall set
out as a minimum:
-The conditions relating to the duration of the
concession;
-The supervisory and control powers of the
granting authorities;
-The methods of renewal;
-The transfer of the plants to the new
concession holder at the end of the
concession;
-The limits minimum fees to be paid by
licensees.
M3C2-3
Reform 2.1-
Implementation
of a Single
Customs
Window
(“Sportello
Unico
Doganale”)
Milestone
Entry into force of the Decree on the Single
Customs Desk (Sportello
Unico
Doganale)
Provision in the
Decree indicating
the entry into
force of the
Decree on the
Single Customs
Desk (Sportello
Unico Doganale)
N/A N/A N/A Q4 2021
The Decree shall define the methods and
specifications of the Single Customs Desk in
compliance with Regulation (EU) 1239/2019
on the implementation of the European
Maritime Single Window and with the
Regulation (EU) 2020/1056 of the European
Parliament and of the Council of 15 July 2020
on electronic freight transport information
(eFTI).
276
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone
/ Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline for
completion
Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
M3C2-4
Reform 1.3-
Simplification of
authorisation
procedures for
cold ironing
plants
Milestone
Entry into force
of the
simplification of
authorisation
procedures for
cold ironing
plants
Legal provision
indicating the
entry into force of
the simplification
of authorisation
procedures for
cold ironing
plants
N/A N/A N/A Q4 2022
Streamline the authorisation process to
reduce the authorisation time to a maximum
of 12 months for the construction of energy
transport infrastructures aimed at supplying
electricity from land to ships during the
mooring phase (in case of interventions not
subjected to environmental assessment)
M3C2-5
Investment 2.1-
Digitalisation of
the logistic
chain
Target
Digitalisation of
the logistic
chain
N/A Number 0 12 Q2 2024
At least 12 of the 16 Port System Authorities
shall be equipped with Port Community
Systems (PCS) services interoperable with
Comando Generale delle Capitanerie di Porto
and/or Agenzia delle Dogane e dei Monopoli
and compatible with the new PLN
(Piattaforma Logistica Nazionale). A Port
System Authority shall be considered
equipped with Port Community Systems
(PCS) services if at least one port of that Port
System Authority has been equipped with the
Port Community Systems (PCS).
M3C2-7 Investment 2.3:
Cold ironing Milestone
Award of all
public contracts
Publication of the
call for tender
and award of all
public contracts
for the
construction of at
N/A N/A N/A Q3 2024
Publication of the call for tender and award of
all contracts for the construction of at least 15
cold ironing plants providing electrical power
in at least 10 ports.
277
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone
/ Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline for
completion
Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
least 15 cold
ironing plants
M3C2-12 Investment 2.3:
Cold ironing Target
Completion of
works and
acceptance of
connection cost
estimates by
the developer
for cold ironing
infrastructures.
Number 0 15 Q2 2026
Certificates of completion of works and
acceptance of connection cost estimates by
the developer for at least 15 cold ironing
infrastructures in at least 10 ports.
278
I.3. Description of the reforms and investments for the loan
Investment 1.1: Green ports: renewable energy and energy efficiency interventions at ports
The objective of this measure is to reduce greenhouse gas emissions and improve air quality in ports and port
cities. This investment consists in supporting initiatives which may include but are not limited to energy
efficiency interventions, renewable energy development as well as the purchase of zero-emission vehicles
and service boats or the transformation of fossil fuel vehicles and service boats into zero-emission ones.
Investment 2.1: Digitalisation of the logistic chain
The objective of this investment is to increase the competitiveness of the national logistics by simplifying
procedures, processes and controls and focusing on the de-materialisation of documents and the exchange of
data and information. This investment consists in the creation of an interoperable digital system between
public and private actors for freight and logistics.
Investment 2.2: Digitalization of air traffic management.
This investment aims at developing new tools for the digitisation of aeronautical information and
implementing unmanned aircraft platforms and services. The investment consists in the development and
connectivity of the Unmanned Traffic Management System (UTMS), the digitalisation of aeronautical
information and the definition of a new maintenance model.
Reform 2.2: Establishment of a National Digital Logistics Platform in order to introduce the
digitalization of freight and/or passenger services
The aim of the reform is to make the Port Community Systems of individual Port System Authorities
interoperable with the National Digital Logistics Platform.
279
I.4. Milestones, targets, indicators, and timetable for monitoring and implementation for the loan
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
M3C2-8
Investment 1.1:
Green ports:
renewable energy
and energy
efficiency
interventions at
ports
Target
Green ports:
assignment of
works
N/A Number 0 7 Q4 2022
Assignment of the works to at least seven Port
System Authorities. The selection procedure for the
assignment of works shall include the following:
a) Eligibility criteria that ensure that the works
comply with the ‘Do no significant harm’ Technical
Guidance (2021/C58/01) and with the relevant EU
and national environmental legislation.
b) Commitment that the climate contribution of the
investment as per the methodology in Annex VI of
the Regulation (EU) 2021/241 shall account for at
least 79% of the total cost of the investment
supported by the RRF.
c) Commitment to report on the implementation of
the measure halfway through the life of the scheme
and the end of the scheme.
M3C2-5bis
Investment 2.1-
Digitalisation of
the logistic chain
Target
Digitalisation
of the logistic
chain
N/A Number 0 3 Q2 2026
The following 3 interventions shall be carried out:
1) Log-IN Center: A digital platform (Piattaforma
Logistica Nazionale - PLN) is available online and
accessible to relevant operators (which may
include, but are not limited to, Port System
Authorities, freight villages, and freight and logistics
280
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
enterprises).
2) Ports network and freight villages:
All of the 16 Port System Authorities shall have
PCS (Port Community System) services compatible
with the Piattaforma Logistica Nazionale (PLN). A
Port System Authority shall be considered
equipped with Port Community Systems (PCS)
services if at least one port of that Port System
Authority has been equipped with the Port
Community Systems (PCS). These PCS services
shall be operational for all core ports as identified
by Regulation (EU) 1679/2024.
At least 12 national freight villages shall have a
Freight Village System (FVS) compatible with the
PLN.
3) Log-IN Business: transfer of resources to at least
887 enterprises to acquire or set-up digital
systems or digital infrastructures compliant, where
applicable, with the national eFTI platform and
supportive of the rollout of eCMR technology.
M3C2-6 Investment 2.2:
Digitalization of air Milestone Digitalisation
of air traffic
Final reports
accepted by N/A N/A Q1 2026
Final reports are accepted by the
Administration for the following 3 projects:
281
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
traffic
management
management the
Administration
N/A a) New maintenance model for traffic management
systems
b) Digitalised Aeronautical Information
c) Unmanned Traffic Management System and
connectivity (UTMS).
M3C2-9
Investment 1.1:
Green ports:
renewable energy
and energy
efficiency
interventions at
ports
Target
Delivery of
goods, works
and services
N/A Number 0 75 Q2 2026 Delivery of goods, works and services related to at
least 75 projects.
M3C2-10
Reform 2.2:
Establishment of
a National Digital
Logistics Platform,
in order to
introduce the
digitalization of
freight and/or
passenger
services
Milestone
National
Digital
Logistics
Platform
Provision in
the legal act
indicating the
entry into force
of the legal act
N/A N/A N/A Q2 2024
Entry into force of legal act that shall ensure the
interoperability of the Port Community Systems
with the National Digital Logistics Platform.
In addition, the legal act shall provide that Port
System Authorities are equipped with PCS
standard services (port community system)
interoperable with public administrations involved
and compatible with the EU Regulation 1056/2020
and with the National Digital Logistics Platform.
282
J. MISSION 4 COMPONENT 1: Strengthening the provision of education services:
from nurseries to universities
This component of the Italian recovery and resilience plan includes four intervention areas: i) Quality
improvement and quantitative expansion of education and training services – from kindergartens to
university; ii) Reform of the teaching profession, particularly concerning recruitment and training
processes, with the scope of increasing teaching staff’s skills and addressing territorial mismatching;
iii) Upskilling and upgrading of infrastructure to enhance digital, science, technology, engineering and
mathematics (STEM) and multilingualism teaching while improving school buildings’ security and
energy efficiency; iv) Reform of degree groups, enabling degrees and Ph.D programmes with the aim
to boost applied research and extending the number of Ph.D scholarships. Measures under this
component aim at addressing the weaknesses of the Italian education, training and research system
with the goal of improving educational outcome and employability of Italian students. The
investments and reforms under this component shall contribute addressing the country specific
recommendations addressed to Italy in 2020 and 2019 on the need to “support women’s participation
in the labour market through a comprehensive strategy, including through access to quality childcare”
(country specific recommendation 2, 2019), to “improve educational outcomes, also through adequate
and targeted investment, and foster upskilling, including by strengthening digital skills” (country
specific recommendation 2, 2019), to “foster research and innovation” (country specific
recommendation 3, 2019), to “strengthen distance learning and skills, including digital ones” (country
specific recommendation 2, 2020) and to “focus investment on research and innovation” (country
specific recommendation 3, 2020).
J.1. Description of the reforms and investments for non-repayable financial support
Investment 1.1: Plan for nurseries and preschools and early childhood education and care
services
The objective of this investment is to increase and enhance educational facilities for children aged 0-
6. The investment consists in building, and/or converting, and/or renovating childcare
facilitiesInvestment 1.3: School Sports Infrastructure Enhancement Plan
The objective of this measure is to promote sport activities in schools. This measure consists in
renovating and/or constructing sports facilities for school use.
Investment 1.4: Extraordinary intervention aimed at the reduction of territorial gaps in I and II
cycles of secondary school and at tackling school drop-out
The measure aims to tackle existing gaps in students’ basic skills. The investment consists in
mentoring and training activities for students at risk of early school leaving and young people who
have already dropped out, also with the support of a national digital portal.
283
Reform 1.1: Reform of Technical and Professional Institutes
The reform aims to align the curricula of technical and professional institutes with competences
needed by the Italian production system, including at local level. In particular, the reform shall make
technical and vocational education consistent with Industry 4.0 and embracing digital innovation.
Reform 1.2: Reform of the tertiary vocational training (ITS)
The reform aims at strengthening the tertiary vocational training system by simplifying ITS
governance in order to increase the number of institutes and enrolments with a view to the local
territory. The reform is expected to bridge the mismatch between labour supply and demand.
Investment 1.5: Development of the tertiary vocational training system (ITS)
The objective of this measure is to increase the role of vocational training institutes (ITS) in the Italian
education system. The investment consists in expanding student enrolment in ITSs and boosting
enterprise involvement in education through the launch of a national digital platform that better
connects training with the labour market.
Reform 1.3: Reorganisation of the school system
The objective of the reform is twofold:
1) Adjustment of the number of pupils per class.
The number of teaching staff shall be set at the same level as in the 2020/2021 school year, in view of
the population decline and in order to reduce the number of pupils per class and gradually improve the
ratio between the number of pupils and the number of teachers on common positions. The
implementation of the intervention shall not increment the number of buildings available. The
initiative shall give personalised attention to individual pupils, particula ly to the most vulnerable and
certainly pupils with disabilities. The improvement of the pupil/teacher ratio is expected to benefit
teaching quality and the availability of resources for school buildings. Reviewing the rules on the size
of school buildings. The regional school population shall be adopted as the "effective parameter" for
identifying the educational institutions with a headmaster and a headmistress, rather than the
population of the individual school, as provided for by current legislation.
Reform 1.4: Reform of the “Orientation" system
The reform aims at introducing orientation modules (at least 30 hours per year) for the fourth and fifth
classes of upper secondary school. The main objective is to support students in taking an informed
choice between continuing their studies or further vocational training (ITS), prior to their integration
into the labour market. The reform also envisages the creation of a digital orientation platform, related
to the tertiary educational offer of Universities and Vocational Training Institutes (ITS).
Investment 1.6: Active orientation in school-university transition
The objective of this measure is to facilitate the transition from upper secondary school to university .
This measure consists in providing orientation courses to students in upper secondary school to
support them in the choice of tertiary education.
284
Investment 1.7: Scholarships for University access
The objective of this measure is to enhance equality in tertiary education access, by supporting
students in socio-economic difficulties. The measure consists in increasing the number ofscholarships
provided to university students.
Reform 1.5: University Degree groups reforms
The reform envisages the update of university curricula, reducing the existing rigid boundaries which
severely limit the possibility of creating cross-disciplinary paths. The reform is also expected to
expand the possibility to implement vocational training programs by introducing innovative job-
oriented degree classes.
Reform 1.6: Enabling University Degree Reform
The reform envisages the simplification of the procedure for accessing professions which require the
enrolment on professional orders through a dedicated professional exam. The measure shall contribute
to harmonize each degree’s final national examination with the corresponding professional order
exam, thereby providing general and clear rules and substitution.
Reform 2.1: Teachers’ recruitment
The objective of this reform is to boost educational outcomes by refining teachers’ qualification,
recruiting, career, training and evaluation systems. This measure consists in the recruitment of
teachers within the reformed recruitment system.
Reform 2.2: Tertiary advanced school and compulsory training for school managers, teachers,
administrative and technical staff
The reform aims at building a quality training system for school staff for the continuous professional
and career development. It envisages the establishment of a qualified body in charge of releasing
guidelines in line with European standards and of the selection and coordination of training initiatives,
possibly linking them to career progressions, as provided for in the recruitment reform – the Reform
2.1: Teachers’ recruitment, included in the plan.
Investment 2.1: Integrated digital teaching and training on the digital transformation for school
staff
The objective of this measure is to establish a permanent system for fostering digital teaching skills
among school staff. The investment consists in the training of school managers, teachers and
administrative staff.
Investment 3.1: New skills and new languages
The objective of this measure is to enhance multilanguage, STEM, digital and innovation skills across
all school levels. The measure consists in activating interdisciplinary STEM guidance projects in
schools and widening Erasmus+ program.
Investment 3.2: School 4.0: innovative schools, wiring, new classrooms and workshops
The objective of this measure is to transform school facilities to allow digital learning. This measure
consists in equipping at least 8000 primary and secondary schools with digital tools, covering at least
100 000 classrooms.
Investment 3.4: Teaching and advanced university skills
The objective of this measure is to qualify and innovate university programs, including Ph.D studies,
to reinforce digital skills and enhance higher education’s global engagement. The investment consists
285
of awarding doctoral scholarships, creating networks of higher education institutions, establishing
Digital Education Hubs, and boosting international cooperation and projects.
Reform 4.1: Ph.D. Programmes Reform
The reform aims at updating the regulation on Ph.D. programmes, simplifying the procedures for the
involvement of companies, research centres, in Ph.D. programmes, and strengthening applied
research. The proposed reform has integrations with all the investments related to Ph.D. programmes
in the target domain “Education and research”.
Investment 4.1: Extension in number and career opportunities of PhDs (Research-oriented,
Public Administration and Cultural Heritage)
The measure aims at increasing the stock of human capital dedicated to research-oriented activities, to
public administration and cultural heritage. The investment envisages the allocation to students, by
Universities and AFAM Institutions, of at least 3 600 general doctoral scholarships, at least 3 000
doctoral scholarships in the field of public administration, and at least 600 new doctoral scholarships
dedicated to cultural heritage.
286
J.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
M4C1-1
Reform 1.5: University
degree groups reform;
Reform 1.6: Enabling
university degrees
reform; Reform 4.1:
Ph.D. Programmes
Reform
Milestone
Entry into force of
the reforms of the
tertiary education
system to improve
educational
outcomes (primary
legislation) on: a)
enabling university
degrees; b)
university degree
groups; c) reform of
PhD programs
Provision in the
law indicating the
entry into force of
the reforms
N/A N/A N/A Q4 2021
The reforms shall include at least
the following key elements: i) Initiatives to reform the
university degree groups
introducing a higher degree of
flexibility to meet the evolving
skills demand of the labour
market; ii) Initiatives to reform the enabling
university degrees, to simplify and
speed up the access to
professions; iii) Initiatives to reform the PHD
programmes to better involve
firms and boost applied research; Measures to reform the tertiary
vocational training system,
including strengthening links and
possible transitions with
professional degrees (lauree
professionalizzanti), to meet the
labour market demand for
technical competences
M4C1-2
Investment 1.7:
Scholarships for
University access
Milestone
Entry into force of
ministerial decrees
for reform on
scholarships to
enhance access to
Provision in the
law indicating the
entry into force of
the reform
N/A N/A N/A Q4 2021
The ministerial decrees adopted
by the Ministry of University and
Research on the reform on
scholarships shall enhance
access to tertiary education for
287
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
tertiary education talented students in socio-
economic difficulties, Increase the
amount of the scholarships and
the number of beneficiaries until
31 December 2024. These
students are identified based on
the ISEE – Indicatore della
Situazione Economica
Equivalente.
M4C1-3 Reform 2.1: Teachers’
recruitment Milestone
Entry into force of
the reform on
teaching profession.
Provision in the
law indicating the
entry into force of
the reform
N/A N/A N/A Q2 2022
The revised legal framework shall
attract, recruit and motivate
quality teachers, in particular
through: i) improving the recruitment
system ii) introducing higher qualification
in teaching to access the
profession in secondary school ; iii) limiting excessive teacher
mobility (in the interest of teaching
continuity); iv) setting a career progression
clearly linked to the performance
evaluation and continuous
professional development.
M4C1-4
Investment 3.2:
School 4.0: innovative
schools, wiring, new
classrooms and
Milestone
School 4.0 Plan to
foster the digital
transition of the
Italian school
Ministry of
Education -
Decree adopting
the School 4.0
N/A N/A N/A Q2 2022 The "School 4.0" plan adopted by
the Ministry of Education to foster
the digital transition of the Italian
288
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
workshops system is adopted plan school system shall include:
a) transformation of 100 000
classrooms into innovative
learning environments
b) creation of laboratories for the
new digital professions in all high
schools.
Action a) shall transform school
spaces intended for traditional
classrooms into innovative,
adaptive and flexible learning
environments, connected,
integrated with digital, physical
and virtual technologies together.
The investment in school facilities
shall bring the most innovative
teaching technologies (coding and
robotics devices, virtual reality
devices, advanced digital devices
for inclusive education, etc. to at
least 100 000 classrooms of
primary and secondary schools
used for lessons).
Action b) shall establish at least
one laboratory for digital
professions in every high school,
a laboratory strictly interconnected
with companies and innovative
289
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
start-ups for the creation of new
jobs in the sector of new digital
professions (such as artificial
intelligence, robotics, big data,
and cybersecurity, blue and green
economy).
At least 40% of the beneficiary
schools shall be located in the
South of Italy.
M4C1-5
Reform 1.3:
Reorganisation of the
school system;
Reform 1.2: Reform of
the tertiary vocational
training system (ITS);
Reform 1.1: Reform of
Technical and
Professional
Institutes; Reform 1.4:
Reform of the
“Orientation” system
Milestones
Entry into force of
the reforms of the
primary and
secondary
education system to
improve educational
outcomes
Provision in the
law indicating the
entry into force of
the reforms
N/A N/A N/A Q4 2022
The primary legislation reforms of
the primary and secondary
education system to improve
educational outcomes (by mean
of primary legislation) shall
include at least the following key
elements: i) Initiatives to reform the
organisation of the education
system to adapt to demographic
developments (such as number of
schools and pupils/teachers ratio) ii) Initiatives to reform the
orientation system to minimise the
drop-out rate in tertiary education; iii) Initiatives to strengthen
secondary vocational education
(Istituti tecnico-professionali)
including adoption of the new
curriculum and their orientation
290
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
towards the innovation output of
the National Industry 4.0 Plan
(Ministero dello Sviluppo
economico, Decreto 26 Maggio
2020); iv) Initiatives for the training of
school managers, teachers and
administrative/technical staff and
the creation of the Tertiary
Advanced School for training to
improve teaching quality; v) Initiatives for the for the
integration of activities,
methodologies and contents
aimed at developing and
strengthening Science,
Technology, Engineering and
Mathematics (STEM) curricula,
digital and innovation skills, in all
cycles of education, from
kindergarten to upper secondary
school, with the aim to boost
enrolment in tertiary STEM
curricula, particularly for women.
In order to satisfactory fulfil the
milestone, the legislation shall
include mandatory deadlines for
the issuance of the secondary
legislation, guidelines and all
291
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
necessary regulatory provisions
(monitoring by the Ministry of
Education Database) to ensure a
smooth implementation.
M4C1-6
Reform 2.2: Tertiary
advanced school and
continuous training for
school managers,
teachers,
administrative and
technical staff
Milestone
Entry into force of
legislation aimed at
building a quality
training system for
school.
Provision in the
law indicating the
entry into force of
the legislation.
N/A N/A N/A Q4 2022
The legislation shall include
provisions aimed at building a
quality training system for school
staff in line with continuous
professional and career
development, the establishment of
a qualified body in charge of
school staff training guidelines,
the selection and coordination of
training initiatives, and shall link
them to career progressions, as
provided for in the recruitment
reform. The implementation of a
system of initial and continuous
training should make it possible to
overcome the current
fragmentation of training paths,
which currently lack a unified
national strategy.
M4C1-7
Investment 1.4:
Extraordinary
intervention aimed at
the reduction of
territorial gaps in I and
II cycles of secondary
Target
Students or young
people who have
participated in
mentoring activities
or training courses
N/A Number 0 820 000 Q3 2025
Certificates of attendance for
mentoring and training activities
delivered to at least 820 000
beneficiaries, shall be issued. The gap in drop-out rate in
292
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
school and at tackling
school drop-out
secondary education is reduced to
reach the EU average 2019
(10,2%), as evidenced by ISTAT.
M4C1-8
Investment 1.3:
School Sports
Infrastructure
Enhancement Plan
Milestone
Award of contracts
for interventions to
build and renovate
sports facilities and
gyms for school use
Notification of the
award of public
contracts for the
eligible
interventions
N/A N/A N/A Q1 2024
Award of contracts for the
interventions to build and
renovate sports facilities and
gyms for school use, following a
public tendering procedure.
M4C1-9
Investment 1.1: Plan
for nurseries and
preschools and early
childhood education
and care services
Milestone
Award of contracts
for building,
renovating and
ensuring the safety
of nurseries,
preschools and
early childhood
education and care
services
Notification by the
local authorities
beneficiaries of
the financing of
the award of
public contracts
for the first set of
eligible
interventions
N/A N/A N/A Q2 2023
Award of contracts and territorial
distribution, for the nursery,
preschool, early childhood
education and care services. The
award shall be done in
compliance with the “Do no
significant harm” Technical
Guidance (2021/C58/01) through
the use of an exclusion list and
the requirement of compliance
with the relevant EU and national
environmental legislation.
M4C1-10
Reform 2.1: Teachers’
recruitment; Reform
1.3: Reorganisation of
the school system;
Reform 1.2: Reform of
the tertiary vocational
training system (ITS);
Reform 1.4: Reform of
Milestone
Entry into force of
regulations for the
effective
implementation and
application of all the
measures
concerning the
reforms of primary,
Provision in the
law indicating the
entry into force of
the regulations.
N/A N/A N/A Q4 2023
The secondary legislation shall
include all necessary regulations
for the effective implementation
and application of all the
measures concerning the reforms
of primary, secondary and tertiary
education:
293
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
the “Orientation”
system; Reform 1.5:
University degree
groups reform;
Reform 1.6: Enabling
university degrees
reform
secondary and
tertiary education,
where needed
- The reforms of the tertiary
education system to improve
educational outcomes (primary
legislation) on: a) enabling
university degrees; b) university
degree groups; c) reform of PhD
programs;
- The ministerial decrees for
reform on scholarships to
enhance access to tertiary
education;
- The reform on teaching
profession;
- The reforms of the primary and
secondary education system to
improve educational outcomes;
- The legislation aimed at building
a quality training system for
school.
M4C1-10 bis
Reform 1.1: Reform of
technical and
professional Institutes
Milestone
Entry into force of
the secondary
legislation.
Provision in the
law indicating the
entry into force of
the secondary
legislation.
N/A N/A N/A Q4 2024
The secondary legislation on the
reform of technical and
professional Institutes entered into
force.
M4C1-11 Investment 1.7:
Scholarships for Target University
scholarship N/A Number 0 55 000 Q4 2023 At least 55 000 students are
awarded with scholarships
294
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
University access awarded financed exclusively by RRF
funds.
M4C1-12
Investment 4.1:
Extension in number
and career
opportunities of PhDs
(Research-oriented,
Public Administration
and Cultural Heritage)
Target
PhD fellowships
programmes
awarded
N/A Number 0 7 200 Q4 2024
At least 3 600 general doctoral
scholarships, at least 3 000
doctoral scholarships in the field
of public administration, and at
least 600 doctoral scholarships on
cultural heritage are awarded over
three years.
M4C1-13
Investment 2.1:
Integrated digital
teaching and training
on the digital
transformation for
school staff
Target
Training of school
managers, teachers
and administrative
staff
N/A Number 0 650 000 Q4 2025
Certificates of attendance for
training courses on digital
teaching and digital
transformation delivered to at
least 650 000 beneficiaries shall
be issued.
M4C1-14
Reform 2.1: Teachers’
recruitment Target
Teachers recruited
with the reformed
recruitment system
N/A Number 0 20 000 Q4 2024
At least 20 000 teachers recruited
with the reformed recruitment
system
M4C1-14 bis Reform 2.1: Teachers’
recruitment Target
Teachers recruited
within the reformed
recruitment system
N/A Number 0 20 000 Q3 2025
At least 20 000 teachers recruited
within the reformed recruitment
system
M4C1-14ter Reform 2.1: Teachers’
recruitment Milestone
Decrees approving
teachers public
competition lists
Adoption of
decrees
approving
teachers public
N/A N/A N/A Q2 2026
Decrees approving the lists for at
least 70 000 candidates who have
successfully passed the public
competition to become teachers
following the reformed recruitment
295
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
competition lists system, including 40 000 teachers
hired under targets M4C1-14 and
M4C1-14bis.
M4C1-15
Investment 1.7:
Scholarships for
University access
Target
Scholarships for
university access
awarded
N/A Number 0 55 000 Q4 2024
At least 55 000 students are
awarded with scholarships
financed exclusively by RRF
funds
M4C1-15 bis
Investment 1.7:
Scholarships for
University access
Target
Scholarships for
university access
awarded
N/A Number 0 83 000 Q2 2026
At least 83 000 students are
awarded with scholarships
financed exclusively by RRF
funds.
M4C1-16
Investment 3.1: New
skills and new
languages
Milestone
Adoption of grant
award decision(s)
for the activation of
STEM projects
Adoption of grant
award decision(s) N/A N/A N/A Q2 2025
Adoption of grant award
decision(s) for the activation of
STEM projects in at least 8 000
schools.
M4C1-17
Investment 3.1: New
skills and new
languages
Milestone New Skills Adoption of grant
award decision(s) N/A N/A N/A Q2 2025
Adoption of grant award
decision(s) for:
i. The activation of language and/or methodological courses, destined to school staff, in at least 8 000 schools.
ii. The strengthening of the Erasmus+ program, addressed to students and/or school staff, for the
296
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
years 2023, 2024, and 2025.
M4C1-19
Investment 3.2:
School 4.0: innovative
schools, wiring, new
classrooms and
workshops
Milestone
Adoption of grant
award decision(s)
for the purchase of
digital devices
and/or the creation
of digital
laboratories
Adoption of grant
award decision(s) N/A N/A N/A Q2 2025
Adoption of grant award
decision(s) for the transformation
of classrooms into innovative
environments and/or the creation
of digital laboratories in at least
8 000 schools.
M4C1-20
Investment 1.5:
Development of the
tertiary vocational
training system (ITS)
Target
Number of students
enrolled in
vocational training
system (ITS)
N/A Number 0 11 000 Q1 2026
At least 11 000 students enrolled
in the ITS Academy National
Registry for the vocational training
system in school years 2024/2025
and 2025/2026. The national
digital platform of the ITS system
is online and accessible as
confirmed by the “Verbale di
collaudo”.
M4C1-22
Investment 1.3:
School Sports
Infrastructure
Enhancement Plan
Target
Construction or
renovation of sports
facilities for school
use
N/A Number 0 300 Q2 2026
Administrative certificates
confirming the construction or
renovation of at least 300 sports
facilities for school use.
297
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
M4C1-23
Investment 3.4:
Teaching and advanced
university skills
Milestone
Actions to qualify
and innovate
secondary
schools and
university
programmes,
including PhDs.
Decree,
agreements,
partnerships
N/A N/A N/A Q2 2026
Awarding decree for at least 500 new
PhDs in programmes activated by
Universities focused on digital and
environmental transitions.
The agreements (‘Atti d’obbligo’) to
financially support 3 Digital Education
Hubs (DEH) shall be signed.
The agreements (‘Atti d’obbligo’) for 3
networks of higher education institutions
shall be signed.
At least 10 partnerships evidenced by
the “Atti d’obbligo” establishing
transnational educational initiatives shall
be signed.
The agreements (“Atti d’obbligo”) to
financially support at least 15
internationalisation projects of AFAM
institutions shall be signed.
M4C1-24
Investment 1.6: Active
orientation in school-
university transition.
Target
Attendance
certificates that
have been issued
for school-
university
transition courses
N/A Number 0 1 000 000 Q2 2026
At least 1 000 000 attendance
certificates have been issued for school-
university transition courses to
secondary school students enrolled in
academic school years from 2022/2023
to 2025/2026.
298
J.3. Description of the reforms and investments for the loan
Reform 1.7: Reform of student housing regulation and investment in student housing
The reform aims to increase university students’ accommodations by encouraging private and public
investments in facilities, with the contribution of the Ministry of University and Research.
The investment consists in providing additional students accommodations.
Investment 1.1: Plan for nurseries and preschools and early childhood education and care services
The objective of this investment is to increase and enhance educational facilities for children aged 0-6. The
investment consists in building, and/or converting, and/or renovating childcare facilities. Investment 1.2:
Plan for the extension of full-time
The objective of this measure is to enable school facilities to extend school hours by refurbishing or building
apposite infrastructures. The investment consists in renovating or building canteen spaces in school facilities.
Investment 3.3: School building security and structural rehabilitation plan
The objective of the measure is to increase the safety and energy performance of school buildings and/or
facilities. This measure consists in interventions aimed at increasing the safety or energy efficiency of school
buildings and/or facilities.
Investment 5: Student housing fund
This measure shall consist of a public investment in a Grant Scheme, in order to incentivise private
investment and improve access to finance in Italy in the student housing sector. The Scheme shall operate by
providing grants directly to the private sector as well as to public sector entities engaged in similar activities.
The Scheme shall be managed by Cassa Depositi e Prestiti S.p.A. (CDP S.p.A.) as the implementing partner.
The Scheme shall include the following product line:
• A lump sum grant of maximum EUR 20 000 for student bed created.
In order to implement the investment into the Scheme, Italy and CDP S.p.A. shall sign an Implementing
Agreement that shall include the following content:
1. Description of the decision-making process of the Scheme: The final award decision of the
Scheme shall be taken by an investment committee or other relevant equivalent governing body
and approved by a majority of votes from members who are independent from the government.
2. Key requirements of the associated grant policy,which shall include:
a. The social requirements of the investment including:
i. The requirement that the rental fee for university students shall be set, at least, at a 15%
below local market prices.
ii. The requirement that 30% of the new places shall be reserved for students facing socio-
economic difficulties as defined by “Diritto allo Studio” organizations (right to study
organizations).
iii. The requirement that existing accommodations used for student housing purposes at the time
of the launch of the relative call for projects cannot be financed.
b. The description of the grants provided and eligible final beneficiaries.
c. The requirement that all investments supported are economically viable.
299
d. The requirement to comply with the ‘Do no significant harm’ (DNSH) principle as set out in the
DNSH Technical Guidance (2021/C58/01). In particular, the grant policy shall exclude the
following list of activities and assets from eligibility: (i) activities and assets related to fossil fuels,
including downstream use73, (ii) activities and assets under the EU Emission Trading System
(ETS) achieving projected greenhouse gas emissions that are not lower than the relevant
benchmarks74, (iii) activities and assets related to waste landfills, incinerators75 and mechanical
biological treatment plants76. For the avoidance of doubt, gas boilers shall not be eligible for
support under this measure.
e. The requirement that final beneficiaries of the Scheme shall not receive support from other Union
instruments to cover the same cost.
3. The amount covered by the Implementing Agreement, the fee structure for the Implementing
Partner and the requirement to use any unused proceeds of the scheme, including beyond 2026, for
the same policy purposes.
4. Monitoring, audit, and control requirements, including:
1. The description of the implementing partner’s monitoring system to report on the
grants mobilized.
2. The description of the implementing partner’s procedures that will ensure the
prevention, detection and correction of fraud, corruption, and conflicts of interests.
3. The obligation to verify the eligibility of every operation in accordance with the
requirements laid out in the Implementing Agreement before awarding a grant to
an operation.
4. The obligation of carrying out risk-based ex-post audits in accordance with an
audit plan of CDP S.p.A. These audits shall verify i) that the control systems are
effective, including the detection of fraud, corruption, and conflict of interests;
ii) compliance with the DNSH principle, the State Aid rules; and iii) that the
requirement that final beneficiaries of the Scheme have not received support from
other Union instruments to cover the same cost is respected. The audits shall also
verify the legality of the transactions and that the conditions of the applicable
Implementing Agreement Grant Agreements are being respected.
73 Except for (a) assets and activities in power and/or heat generation, as well as related transmission and distribution
infrastructure, using natural gas, that are compliant with the conditions set out in Annex III of the ‘Do no significant
harm’ Technical Guidance (2021/C58/01) and (b) activities and assets under point (ii) for which the use of fossil fuels is
temporary and technically unavoidable for the timely transition towards a fossil fuel free operation. 74 Where the activity supported achieves projected greenhouse gas emissions that are not significantly lower than the
relevant benchmarks, an explanation of the reasons why this is not possible shall be provided. Benchmarks established
for free allocation for activities falling within the scope of the Emissions Trading System, as set out in the Commission
Implementing Regulation (EU) 2021/447. 75 This exclusion does not apply to actions under this measure in plants exclusively dedicated to treating non-recyclable
hazardous waste, and to existing plants, where the actions under this measure are for the purpose of increasing energy
efficiency, capturing exhaust gases for storage or use or recovering materials from incineration ashes, provided such
actions under this measure do not result in an increase of the plants’ waste processing capacity or in an extension of the
lifetime of the plants; for which evidence is provided at plant level. 76 This exclusion does not apply to actions under this measure in existing mechanical biological treatment plants, where
the actions under this measure are for the purpose of increasing energy efficiency or retrofitting to recycling operations
of separated waste to compost bio-waste and anaerobic digestion of bio-waste, provided such actions under this measure
do not result in an increase of the plants’ waste processing capacity or in an extension of the lifetime of the plants; for
which evidence is provided at plant level.
300
J.4. Milestones, targets, indicators, and timetable for monitoring and implementation for the loan
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
M4C1-18
Investment 1.1:
Plan for nurseries
and preschools and
early childhood
education and care
services
Target
Places for early
childhood education
and care for children
aged 0-6.
N/A Number 0 150 480 Q2 2026
At least 150 480 places are newly built,
renovated or resulting from change of
use, building expansions, or demolitions
and reconstructions, in early childhood
education and care services for children
aged 0-6, of which a maximum of 35 000
places resulting from demolition and
reconstruction of existing places. The
investment shall not include the
procurement of natural gas boilers.
M4C1-21
Investment 1.2:
Plan for the
extension of full-
time
Target
Construction and/or
renovation of canteen
in schools
N/A Number 0 1 000 Q2 2026
Administrative certificates confirming that
constructions and/or renovations of at
least 1 000 canteens in schools have
been carried out.
M4C1-26
Investment 3.3:
School building
security and
structural
rehabilitation plan
Target
Interventions
enhancing the safety
and/or energy
efficiency
N/A Number 0 1 400 Q2 2026
Administrative certificates confirming that
interventions enhancing the safety
and/or energy efficiency in at least 1 400
school buildings and/or facilities have
been carried out. The investment shall
not include the procurement of natural
gas boilers.
M4C1-27
Reform 1.7: Reform
of student housing
regulation and
investment in
Milestone
Entry into force of
legislation to amend
the current rules for
student housing.
Provision in the
law indicating the
entry into force of
the legislation.
N/A N/A N/A Q4 2021
The revised legislation shall: Amend the current rules for student
housing (law 338/2000 and the
Legislative Decree 68/2012) in order to:
301
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
student housing (1). Fostering the restructuring and
renovation of structures instead of new
green-field buildings (with a greater
percentage of cofounding, currently at
50%), with the highest environmental
standard to be ensured by the presented
projects;
(2). Simplify, also thanks to the
digitalization, the presentation and
selection of projects and, therefore, the
implementation timing;
(3) Provide by law for a derogation from
the criteria set out in Law no. 338/2000
with regard to the percentage of co-
financing that can be Granted.
A reform will be implemented, by
introducing in the Italian regulatory
framework for student housing financing
the following major changes:
1. Opening up the participation to the
funding also to private investors
(according to the scheme described in
the implementation), also allowing
public-private partnerships where the
university will make use of the available
funding to support the financial
equilibrium in real-estate investments for
302
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
student housing;
2. Ensuring the long-term sustainability
of the private investments by
guaranteeing a change in the taxation
scheme from the one applied for hotel
services to the one applied for social
housing, by constraining the use of the
new accommodations for student
housing purposes during the Academic
Year, but allowing the use of the
structures when they are not needed for
student hospitality. This will, in turn, help
the supply of a new range of
accommodation at affordable rents.
Conditioning the funding as well as
additional tax allowances (e.g. the equal
treatment with the social housing) on the
use of the new accommodations for
student housing during the overall
investment horizon and the compliance
with the agreed upper bound in the rents
charged to students even beyond the
expiration of special funding schemes
that my contribute to trigger the
investment by the private operators.
Redefining the standards for student
accommodations, by redetermining the
law requirements regarding the common
303
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
space per student available in the
buildings in exchange for better
equipped (single) rooms.
M4C1-28
Reform 1.7: Reform
of student housing
regulation and
investment in
student housing
Milestone
Awards of initial
contracts for the
creation of additional
sleeping
accommodation units
(beds)
Publication of the
awards in the
Ministry’s website
N/A N/A N/A Q2 2023
Awards of initial contracts for the
creation of additional sleeping
accommodation units (beds)’;
M4C1-29
Reform 1.7: Reform
of student housing
regulation and
investment in
student housing
Milestone
Entry into force of the
reform on student
housing legislation.
Provision in the
law indicating the
entry into force of
the reform.
N/A N/A N/A Q4 2022
The reform shall include: (1) Opening up
the participation to the funding also to
private investors, also allowing public-
private partnerships where the university
will make use of the available funding to
support the financial equilibrium in real-
estate investments for student housing;
(2). Ensuring the long-term sustainability
of the private investments by
guaranteeing a change in the taxation
scheme from the one applied for hotel
services to the one applied for social
housing, by constraining the use of the
new accommodations for student
housing purposes during the Academic
Year, but allowing the use of the
structures when they are not needed for
student hospitality ; (3). Conditioning the
funding as well as additional tax
304
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
allowances (such as the equal treatment
with the social housing) on the use of the
new accommodations for student
housing during the overall investment
horizon and the compliance with the
agreed upper bound in the rents charged
to students even beyond the expiration
of special funding schemes that my
contribute to trigger the investment by
the private operators; (4). Redefining the
standards for student accommodations,
by redetermining the law requirements
regarding the common space per student
available in the buildings in exchange for
better equipped (single) rooms.
M4C1-30
Reform 1.7: Reform
of student housing
regulation and
investment in
student housing
Target
Student sleeping
accommodation units
created
N/A Number 0 30 000 Q2 2026
Certificates of completion of works issued in compliance with Ministerial Decree No. 481 of 26 February 2024, as amended by Ordinance No. 10 of 21 May 2026, confirming that at least 30 000 newly sleeping accommodation units have been created. At the time of the launch of the related call for projects, existing accommodations used for student housing purposes cannot be accounted toward the target. The 2024 call shall require that 30% of
305
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
the new places shall be reserved for students facing socio-economic difficulties, as defined by “Diritto allo Studio” organizations (right to study organizations). This call shall also require that rental fees for university students shall be set at least, at a 15% below local market prices. The investment shall not include the procurement of natural gas boilers.
M4C1-31 Investment 5:
Student housing
fund
Milestone Implementing
Agreement
Entry into force of
the Implementing
Agreement
N/A N/A N/A Q4 2025 Entry into force of the Implementing Agreement.
M4C1-32 Investment 5:
Student housing
fund
Milestone Legal agreements
signed with final
beneficiaries and
investment
completion
Legal agreements
signed and
certificate of
transfer
N/A N/A N/A Q2 2026 Cassa Depositi e Prestiti S.p.A. shall have entered into legal grant agreements with final beneficiaries for an amount necessary to use 100% of the RRF investment into the Scheme (taking into account management fees).
Italy shall transfer EUR 599 000 000 to the Cassa Depositi e Prestiti S.p.A. for the Facility.
306
K. MISSION 4 COMPONENT 2: From research to business
This component of the Italian recovery and resilience plan aims to support investment in research and
innovation, to promote innovation and technology diffusion, to strengthen skills, and supporting the
transition to a knowledge-based economy. It provides support to the public research system,
researcher’s skills and mobility as well as public-private cooperation at national and EU level. It is
built on three main pillars: (i) Improved science base; (ii) Strong business-science links (knowledge
and technology transfers; (iii) Support for business innovation (notably SMEs, start-ups).
The investments and reforms under this component shall contribute addressing the country- specific
recommendations addressed to Italy in 2020 and 2019 on the need to “focus investment-related
economic policy on research and innovation, and the quality of infrastructure” (country- specific
recommendation 3, 2019), to “promote private investment to foster the economic recovery” (country-
specific recommendation 3, 2020), to “focus investment on the green and digital transition,
particularly on research and innovation” (country- specific recommendation 3, 2020).
K.1. Description of the reforms and investments for non-repayable financial support
Investment 1.2: Funding projects presented by young researchers
The objective of this investment is to retain young researchers in Italy. The measure consists in
supporting the research activities of young researchers.
Investment 2.2bis: Innovation Agreements
The objective of this measure is to boost innovation. The measure consists in the definition of
research, development and innovation projects (so-called ‘’Innovation Agreements’’) , in areas
coherent with the II pillar of Horizon Europe programme, as per Regulation (EU) 2021/695.
Investment 3.3: Award of PhD scholarships in collaboration with enterprises
The objective of this measure is to enhance high-level skills, including in the areas of Key Enabling
Technologies.
The measure consists in awardingPhD scholarships by Universities and AFAM institutions, with input
and involvement of companies. Specifically, the measure, implemented by the MUR – Ministry of
University and Research, provides for the award of a total of 6 000 doctoral grants in 3 years, with
private co-financing
Reform 1.1: Implementation of R & I support measures to promote simplification and mobility
The reform shall be implemented by the Ministry of University and Research (MUR) and the Ministry
of Economic Development (MiSE) through the creation of an inter-ministerial steering board and the
issuing of two ministerial decrees: i) to increase and support mobility (through incentives) of high-
profile individuals ( such as: researchers and managers) between universities, research infrastructures
and companies, and ii) to simplify the management of research funds, iii) reform career path of
researchers to increase their focus on research activities.
307
The reform shall move to a more systemic approach to R&D activities, going beyond the current logic
of reallocating resources by favouring a sharing approach and shall focus on simplifying red tape in
the management of funds dedicated to public-private research activities, generating a significant
impact through avoiding dispersion and fragmentation of priorities, also supported by the first
component of the Mission. Public research bodies (EPR) shall play a key role both as possible project
leaders for Partnerships, National Campaigns and Territorial Ecosystems, and as potential participants
in calls for proposals on the PNR Fund and the Infrastructure Fund.
Reform 1.2: Three-year plan for the financing of research activities
The reform aims at improving the planning and predictability of research funding. It consists in the
entry into force of primary legislation setting out the legal framework for the adoption of a three-year
plan for the financing of research activities.
308
K.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each
milestone and target Unit of
measure Baseline Goal Quarter Year
M4C2-1
Investment
1.2: Funding
projects
presented by
young
researchers
Target
Number of
students
awarded of a
research grant
N/A Number 50 300 Q4 2022
Award of at least 300 research
grants to students. The
selection procedure for the
awarding shall include eligibility
criteria that ensure that the
selected projects comply with
the ‘Do no significant harm’
Technical Guidance
(2021/C58/01) through the use
of an exclusion list and the
requirement of compliance with
the relevant EU and national
environmental legislation.
The satisfactory fulfilment of
the target will also take into
consideration that at least 300
of young researchers are
contracted.
M4C2-1bis
Investment 1.2:
Funding
projects
presented by
young
researchers
Milestone
Publication of
the decree(s)
awarding the
funding to
young
researchers
Publication of
the decree(s) N/A N/A N/A Q2 2025
Publication of the decree(s)
awarding the funding to support
at least 550 young researchers.
Young researchers shall
respect the following
conditions: being aged up to 40
years old at the date when the
call was lanched (profiles that
are 40 years old at the date of
309
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each
milestone and target Unit of
measure Baseline Goal Quarter Year
the publication of the call for
projects are eligible until
turning 41 years old) or, for
profiles aged between 41 years
old and 45 years old having
completed the PhD maximum 7
years earlier (profiles that are
45 years old at the date of the
publication of the call for
projects are eligible up until
turning 46 years old).
M4C2-2bis
Investment 2.2
bis: Innovation
Agreements
Target
Innovation
Agreements
for which the
Ministry of
Enterprises
and Made in
Italy has
confirmed
acceptance of
the
transmission
of final reports
by
beneficiaries
N/A Number 0 32 Q4 2025
Confirmation from the Ministry
of Enterprises and Made in
Italy accepting the transmission
of the final reports by
beneficiaries for at least 32
Innovation Agreements
covering at least one of the
following intervention areas:
o manufacturing
technologies;
o key digital technologies,
including quantum
technologies;
o emerging enabling
technologies;
310
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each
milestone and target Unit of
measure Baseline Goal Quarter Year
o advanced materials;
o artificial intelligence and
robotics;
o circular industries;
o low carbon and clean
industries;
o non-communicable and
rare diseases;
o infectious diseases,
including poverty-related
and neglected diseases;
o tools, technologies and
digital solutions for
health and care,
including personalised
medicine;
o industrial facilities in
energy transition;
o industrial
competitiveness in
transport;
o clean, safe and
accessible transport and
311
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each
milestone and target Unit of
measure Baseline Goal Quarter Year
mobility;
o smart mobility;
o energy storage;
o food systems;
o bio-based innovation
systems in the Union's
bioeconomy;
o circular systems.
The Innovation Agreements for
which the Ministry of
Enterprises and Made in Italy
confirmed acceptance of the
transmission of final reports by
beneficiaries shall comply with
the ‘Do no significant harm’
Technical Guidance
(2021/C58/01).
M4C2-3
Investment 3.3:
Award of PhD
scholarships in
collaboration
with enterprises
and promote
the hiring of
researchers by
Target
Number of
PhDs
scholarships
awarded
N/A Number 0 6 000 Q4 2024
Award of at least 6 000 Ph.D
scholarships, by Universities and AFAM institutions.
Critical requirements for the award of PhDs include:
a) provide for periods of study and research in the company from a minimum of six (6)
312
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each
milestone and target Unit of
measure Baseline Goal Quarter Year
companies months to a maximum of eighteen (18) months;
b) provide for periods of study and research abroad from a minimum of six (6) months to a maximum of eighteen (18) months;
c) provide for the involvement of companies in defining the training course also in the context of wider collaborations with the University and AFAM Institutions.
M4C2-4
Reform 1.1:
Implementation
of R&D support
measures to
foster
simplification
and mobility
Milestone
Entry into
force of
Ministerial
Decrees on
R&D
simplification
and mobility
linked to the
ordinary
financing fund.
Provision in the
decree
indicating the
entry into force
of the law
N/A N/A Q2 2022
The Ministerial Decrees shall
include the following key
elements:
i) move to more systemic
approach to R&D activities
through a new simplified model
aimed at generating a
significant impact through
avoiding dispersion and
fragmentation of priorities; ii)
reform legislation to increase
mobility of high-profile figures
(such as researchers and
managers) among Universities,
Research infrastructures and
companies; iii) simplification of
funds management; iv) reform
313
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each
milestone and target Unit of
measure Baseline Goal Quarter Year
career path of researchers to
increase their focus on
research activities.
M4C2-4bis
Reform 1.2:
Three-year
plan for the
financing of
research
activities
Milestone
Primary
legislation for
the adoption of
the three-year
plan for the
financing of
research
activities
Entry into force
of primary
legislation
setting out the
three-year plan
for the
financing of
research
activities
N/A N/A N/A Q4 2025
The reform requires the entry in
force of primary legislation
setting out the legal framework
for the adoption of a three-year
plan for the financing of reserch
activities.
The legal framework shall:
1) Set-up a fund to merge different financing instruments ;
2) require the adoption of the
three-year plan for the
financing of research
activites of universities,
research entities and
AFAM istitutions;
3) Require the adoption of a
timeline
(‘’cronoprogramma’’) for
the launch of calls for
projects and for the
conclusion of their
selection procedures.
4) Include a specific budget
item for the financing of
PRIN projects.
314
K.3. Description of the reforms and investments for the loan
Investment 1.1: Research Projects of Significant National Interest (PRIN)
The objective of this measure is to support research activities. The measure consists in financing research
projects of major national interest (PRIN) entailing the collaboration among university research units and
research bodies and the hiring of fixed-term researchers.
Investment 1.3: Partnerships extended to universities, research centres, companies and
funding of basic research projects
The measure aims to establish networks of universities, research organisations and other stakeholders, foster
technology transfer and support research-based start-ups and spin-offs. The measure consists in financing at
least 14 major basic research programmes carried out by networks of public and private subjects.
Investment 1.4: Creation of “national R&D leaders” on some Key Enabling Technologies
The objective of this measure is to create national R&D leaders. The measure consists in financing five
national research centres focused on research in key technologies areas which may include, but are not
limited to high-performance computing, agritech, genetherapy and RNA-based drug development,
sustainable mobility, bio-diversity
Investment 1.5: "Innovation ecosystems for sustainability", building "territorial leaders of R&D".
The objective ot this measure is to boost innovation. The measure consists in financing existing or new
innovation ecosystems.
Investment 2.1: Important Project of Common European Interest (IPCEI)
The objective of this measure is to supplement the current IPCEI fund, referred to in Article 1 (232) of the
2020 Budget Law The measure consits in supporting the IPCEI fund with additional resources.
Investment 2.3: Technology transfer centres
The objective of this measure is to support a network of centres (Competence Centres, European Digital
Innovation Hub, Seal of Excellence, National Digital Innovation Centres) responsible for at least one of the
following: project development, the provision of advanced technological services to companies and public
administrations and technology transfer services.
The RRF finances at least 32 centres exclusively, without any support from other EU sources. The RRF and
the Digital Europe Programme co-finance 13 European Digital Innovation Hubs (EDIHs). The operation of
each of these EDIHs shall be structured into work packages. The RRF finances certain work packages
exclusively, while the remaining work packages are financed by the Digital Europe Programme.
Investment 3.1: Research and innovation infrastructures
The objective of the measure is to support the creation or modernization of research and innovation
infrastructures linking industry and academia, or to support the existing ones. The investment consists in
financing existing or new infrastructure projects with a research manager for each infrastructure.
Investment 3.2: Equity injection into the Digital Transition Fund (“DTF”) managed by CDP Venture
Capital SGR
This measure aims at supporting the growth potential of the Italian economy by incentivizing private
investments, improving access to finance for start-ups, and developing the venture capital market in this
sector. The measure shall consist of an equity injection of EUR 400 000 000 into the Digital Transition Fund
(“DTF”) managed by CDP Venture Capital SGR.
CDP Venture Capital SGR shall adopt an investment policy for the use of the equity. The investment policy
shall include the description of the financial product(s) with the expected type of eligible final beneficiaries
315
that the equity is expected to support, including the expected timeline for the implementation of 15 years and
the management fee of maximum 13%.77 The DTF shall operate by providing equity, quasi equity, debt or
quasi debt support, directly or indirectly.78 CDP Venture Capital SGR shall adopt the audit and control
system described in the guidelines “Linee Guida per le attività di rendicontazione e controllo dei Fondi DTF
e GTF” for the use of the equity. The Investment Policy shall require that financial product(s) that the equity
supports comply with the ‘Do no significant harm’ (DNSH) principle as set out in the DNSH Technical
Guidance (2021/C58/01). In particular, in the case of general support to start ups, the investment policy shall
exclude companies with a substantial focus79 in the following sectors: (i) fossil fuel-based energy production
and related activities80; (ii) energy-intensive and/or high CO2-emitting industries81; (iii) production, rental, or
sale of polluting vehicles82; (iv) waste collection, waste treatment and disposal83, (v) processing of nuclear
fuel, production of nuclear energy. Moreover, the investment policy shall require compliance with the
relevant EU and national environmental legislation.
77 In particular, the13% maximum cap does not include carried interested, performance fees related to DTF and
all costs and management fees related to indirect investments / third party funds.
78 In particular, in case of direct investments, the DTF shall operate by providing equity or quasi equity support;
in case of indirect investments, the DTF shall operate by financing third party funds which shall operate by providing at
least one of the following: equity, or quasi-equity, or debt, or quasi-debt instruments.
79 It is considered that a Final Beneficiary has a “substantial focus” on a sector or business activity if such sector or
activity is identified as being an essential part of the business activity of the Final Beneficiary respectively in relation to
the gross revenue, profit, or client base of the Final Beneficiary. The gross revenue generated from the restricted sector
or activity shall, in any case, not exceed 50% of the gross revenue.
80 Except for (a) assets and activities in power and/or heat generation, as well as related transmission and distribution
infrastructure, using natural gas, that are compliant with the conditions set out in Annex III of the ‘Do no significant
harm’ Technical Guidance (2021/C58/01) and (b) activities and assets under point (ii) for which the use of fossil fuels is
temporary and technically unavoidable for the timely transition towards a fossil fuel free operation.
81 Including activities and assets under the EU Emission Trading System (ETS) achieving projected greenhouse gas
emissions that are not lower than the relevant benchmarks. Where the activity supported achieves projected greenhouse
gas emissions that are not significantly lower than the relevant benchmarks, an explanation of the reasons why this is
not possible shall be provided. Benchmarks established for free allocation for activities falling within the scope of the
Emissions Trading System, as set out in the Commission Implementing Regulation (EU) 2021/447.
82 Polluting vehicles are defined as non-zero-emission vehicles.
83 This exclusion does not apply to actions in plants exclusively dedicated to treating non-recyclable hazardous waste,
and to existing plants, where the actions under this measure are for the purpose of increasing energy efficiency,
capturing exhaust gases for storage or use or recovering materials from incineration ashes, provided such actions under
this measure do not result in an increase of the plants’ waste processing capacity or in an extension of the lifetime of the
plants; for which evidence is provided at plant level.
316
K.4. Milestones, targets, indicators, and timetable for monitoring and implementation for the loan
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each
milestone and target Unit of
measure Baseline Goal Quarter Year
M4C2-5
Investment 1.1:
Research
Projects of
Significant
National
Interest (PRIN)
Target
Number of
research
projects
awarded
N/A Number 0 3 150 Q4 2023
Award of at least 3 150
Progetti di Ricerca di Interesse
Nazionale research projects.
The award of the contracts to
the projects selected under
the competitive calls for
proposals shall be made in
compliance with the ’Do no
significant harm’ Technical
Guidance (2021/C58/01)
through the use of an
exclusion list and the
requirement of compliance
with the relevant EU and
national environmental
legislation.
M4C2-6
Investment 1.1:
Research
Projects of
Significant
National
Interest (PRIN)
Milestone
Publication of
the decree(s)
awarding the
projects
Publication of the
decree(s) N/A N/A N/A Q2 2025
Publication of the decree(s)
awarding at least 5 350
Research Projects of National
Interest (Progetti di Ricerca di
Interesse Nazionale).
The calls for projects shall
specify that the duration of the
317
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each
milestone and target Unit of
measure Baseline Goal Quarter Year
project shall be at least two
years, and require the
collaboration among university
research units and research
bodies.
M4C2-7
Investment 1.1:
Research
Projects of
Significant
National
Interest (PRIN)
Target
Number of fixed-
term
researchers
hired
N/A Number 0 900 Q2 2025
At least 900 fixed-term
researchers shall be hired.
Hired researchers activities
shall concern topics coherent
with the six clusters of the
European Framework
Programme for Research and
Innovation 2021-2027.
M4C2-8
Investment 1.3:
Partnerships
extended to
universities,
research
centers,
companies and
funding of basic
research
projects
Target
Number of
research
partnerships
signed
N/A Number 0 14 Q2 2025
Signature of the agreements (‘’atto d’obbligo’’) for at least 14 research partnerships. The calls for programmes shall require: a) each partnership to hire at least 100 fixed-term researchers; b) Commitment that the climate contribution of the investment as per the methodology in Annex VI of the Regulation (EU) 2021/241 shall account for at least 42%
318
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each
milestone and target Unit of
measure Baseline Goal Quarter Year
of the total cost of the investment supported by the RRF.
M4C2-9
Investment 1.4:
Creation of
“national R&D
leaders” on
some Key
Enabling
Technologies
Target
National Centres
for which an
activity report
has been issued
N/A Number 0 5 Q2 2026
Activities report for each of the
5 National Centres shall be
issued.
M4C2-10 Investment 2.1:
IPCEI Milestone
Launch of the
call for
expression of
interest for the
identification of
the national
projects,
including
projects on
IPCEI
microelectronic
The call for
expression of
interest is
published
N/A N/A N/A Q2 2021
The IPCEI projects that shall
be supported are expected to
be updated depending on the
actual progress stage of the
national IPCEI procedures
currently on going and the
progress stage of the state aid
notification procedure.
The chosen IPCEI shall regard
specific industrial innovative
sectors in line with the
European value chains
already identified.
319
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each
milestone and target Unit of
measure Baseline Goal Quarter Year
This intervention includes both
already approved IPCEIs and
future ones, such as cloud,
health, row materials, and
cybersecurity.
The terms of the call shall
include the following:
a) Eligibility criteria that ensure that the selected projects comply with the ‘Do no significant harm’ Technical Guidance (2021/C58/01) through the use of an exclusion list and the requirement of compliance with the relevant EU and national environmental legislation. b) Commitment that the climate contribution of the investment as per the methodology in Annex VI of the Regulation (EU) 2021/241 shall account for at least 40% of the total cost of the investment supported by the RRF.
320
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each
milestone and target Unit of
measure Baseline Goal Quarter Year
c) Commitment that the digital contribution of the investment as per the methodology in Annex VII of the Regulation (EU) 2021/241 shall account for at least 60% of the total cost of the investment supported by the RRF. d) Commitment to report on the implementation of the measure halfway through the life of the scheme and at the end of the scheme.
M4C2-11 Investment 2.1:
IPCEI Milestone
Entry into force
of national legal
act allocating
the necessary
funding to
provide support
to project
participants.
Provision in the
National Legal Act
indicating the
entry into force of
the act
N/A N/A N/A Q2 2022
The National Legal Act shall
indicate the procedures and
deadlines for submitting
projects, as well as the access
requirements of potential
beneficiaries.
M4C2-12 Investment 2.1:
IPCEI Milestone
The list of
participants to
IPCEI projects is
finalised by
30/06/2023
Publication of the
list of participants N/A N/A N/A Q2 2023
The list shall include the
admitted subjects participating
in the IPCEI projects, following
the verifications and
evaluations on the projects
presented that shall be made
321
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each
milestone and target Unit of
measure Baseline Goal Quarter Year
in compliance with the ’Do no
significant harm’ Technical
Guidance (2021/C58/01)
through the use of an
exclusion list and the
requirement of compliance
with the relevant EU and
national environmental.
M4C2-14
Investment 2.3:
Technology
transfer centres
Target
Disbursement of
financial value of
EUR
309 000 000
N/A EUR 0 309 000 000 Q2 2026
A total value of at least
EUR 309 000 000 of payment
orders shall be issued to at
least 45 hubs for which the
Ministry has signed financial
agreements with.
The agreements with the 13
European Digital Innovation
hubs co-funded by the Digital
Europe Programme shall
specify the work packages
financed by the RRF.
For the 13 European Digital
Innovation Hubs, The
payments orders shall concern
work packages financed
322
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each
milestone and target Unit of
measure Baseline Goal Quarter Year
exclusively by the RRF.
Confirmation shall be issued
from the Ministry of
Enterprises and Made in Italy
accepting the transmission of
the final completion reports by
beneficiaries for at least 45
hubs.
M4C2-16
Investment 3.1:
Research and
innovation
infrastructures
Target
Number of
infrastructures
funded
N/A Number 0 30 Q2 2023
At least 30 infrastructures
funded for the integrated
system of research and
innovation infrastructure. The innovation infrastructure
shall include multi-purposes
infrastructures able to cover at
least three topic fields as: (i)
quantum, (ii) advanced
materials, (iii) photonics, (iv)
life-sciences, (v) artificial
intelligences, (vi) energy
transition.
The satisfactory fulfilment of
the target also depends on the
hiring of at least 30 research
managers for the integrated
323
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each
milestone and target Unit of
measure Baseline Goal Quarter Year
system of research and
innovation infrastructure.
M4C2-16 bis
Investment 3.1:
Research and
innovation
infrastructures
Target
Research and
innovation
infrastructures
for which an
activity report
has been issued
N.A. Number 0 30 Q2 2026
Activities reports for at least
30 projects of research (IR) or
innovation (ITEC)
infrastructures shall be issued.
M4C2-17
Investment 3.1:
Fund for
construction of
an integrated
system of
research and
innovation
infrastructures;
Investment
Milestone
Award of
contracts for the
projects
concerning: a)
integrated
system of
research and
innovation
infrastructures
Notification of the
award of contracts N/A N/A N/A Q2 2022
Notification of the award of the
contracts to the projects
selected under the competitive
calls for proposals, in
compliance with the ’Do no
significant harm’ Technical
Guidance (2021/C58/01)
through the use of an
exclusion list and the
requirement of compliance
with the relevant EU and
national environmental
legislation.
Proposals shall be selected
based on the following criteria:
scientific/technological/innovat
ion leadership, their innovation
324
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each
milestone and target Unit of
measure Baseline Goal Quarter Year
potential (both in terms of
open innovation/open data
and for proprietary
developments), their
compliance with the thematic
areas or for novel disruptive
developments, their
translational and innovation
plans, the support from
industry as a partner for open-
innovation and/or as users,
the strength of the business
development activities, IP
generation, clear rules for
distinguishing open and
protected output and licensing
plans, their ability to develop
and host industrial doctorates,
links with the venture or other
types of funds to facilitate the
development of new start-ups.
The selection procedure shall
require a DNSH evaluation,
and, where applicable a
Strategic Environmental
Assessment (SEA) in case the
325
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each
milestone and target Unit of
measure Baseline Goal Quarter Year
project shall be expected to
produce a consistent impact
on the territory.
M4C2-18
Invesment1.5:
Establishing
and
strengthening of
“innovation
ecosystems for
sustainability",
building
“territorial
leaders of R&D”
Milestone
Award of
contracts for
projects
concerning
innovation
ecosystems;
Notification of the
award of contracts N/A N/A N/A Q2 2022
Notification of the award of the
contracts to the projects
selected under the competitive
calls for proposals, in
compliance with the ’Do no
significant harm’ Technical
Guidance (2021/C58/01)
through the use of an
exclusion list and the
requirement of compliance
with the relevant EU and
national environmental
legislation.
The selection procedure shall
require a DNSH evaluation,
and, where applicable, a
Strategic Environmental
Assessment (SEA) in case the
project shall be expected to
produce a consistent impact
on the territory.
The National Centres (NCs)
326
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each
milestone and target Unit of
measure Baseline Goal Quarter Year
shall be created following a
competitive call by merging
existing world-leading
laboratories already present in
Universities, and public and
private research centres, as
well as by setting up new
bespoke infrastructure.
M4C2-18 Bis
Invesment 1.5:
“Innovation
ecosystems for
sustainability",
building
“territorial
leaders of R&D”
Target
Innovation
ecosystems for
which an activity
report has been
issued
N.A. Number 0 10 Q2 2026
Activities reports for at least
10 innovation ecosystems
shall be issued.
M4C2-19
Investment 1.4:
Strengthening
research
structures and
supporting the
creation of
“national R&D
leaders” on
some Key
Enabling
Milestone
Award of
contracts for
projects
concerning
national R&D
leaders on key
enabling
technologies
Notification of the
award of contracts N/A N/A N Q2 2022
Notification of the award of the
contracts to the projects
selected under the competitive
calls for proposals, in
compliance with the ’Do no
significant harm’ Technical
Guidance (2021/C58/01)
through the use of an
exclusion list and the
requirement of compliance
with the relevant EU and
327
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each
milestone and target Unit of
measure Baseline Goal Quarter Year
Technologies national environmental
legislation.
The projects shall be selected
for 30% of the resources as
interventions “Research and
innovation processes,
technology transfer and
cooperation between
enterprises focusing on the
low carbon economy,
resilience and adaptation to
climate change” (IF022), and
for 15% of the resources as
interventions “Research and
innovation processes,
technology transfer and
cooperation between
enterprises focusing on
circular economy” (IF023).
Projects shall be assessed
taking into account their
feasibility, sustainability,
cofounding from other sources
(such as. regional funds),
involvement of the productive
sector, quality of the partners,
328
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each
milestone and target Unit of
measure Baseline Goal Quarter Year
and impact on social and
environmental sustainability.
The call for projects to be
financed as innovation
ecosystems. The selection
procedure shall require a
DNSH evaluation, and, where
applicable, a Strategic
Environmental Assessment
(SEA) in case the project is
expected to produce a
consistent impact on the
territory.
M4C2-20
Investment 3.2:
Equity injection
into the Digital
Transition Fund
(“DTF”)
Milestone
The agreement
between IT
government and
the
implementing
partner Cassa
Depositi e
Prestiti (CDP)
establishing the
financial
instrument
signed
The agreement is
signed by Italian
Government and
Cassa Depositi e
Prestiti
N/A N/A N/A Q2 2022
The elements that shall be
included in Financial
Instrument’s investment
policy/strategy are:
- Investment targets (fund
size, number of operations,
amounts to be supported
over time differentiated by
beneficiary such as SMEs
and mid-caps/large
companies)
- Scope and eligible
329
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each
milestone and target Unit of
measure Baseline Goal Quarter Year
beneficiaries
- Eligible financial
intermediaries and selection
process
- Type of support provided
(such as guarantees, loans,
equity and quasi-equity)
- Targeted risk/returns for
each type of investor
- Risk policy and AML policy
- Governance (partners, fund
managers, Board,
Investment Committee, role
and responsibilities)
- Diversification and
concentration limits
- Equity policy including exit
strategy for equity
investments
- DNSH and sustainability
proofing policy and
330
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each
milestone and target Unit of
measure Baseline Goal Quarter Year
exclusion list
- Lending policy for debt
investment, including
required guarantees and
collateral
- Timeline for fund raising
and for implementation
M4C2-21bis Investment 3.2
Equity injection
into the Digital
Transition Fund
(“DTF”)
Milestone Equity injection
into the Digital
Transition Fund
Certificate of
transfer
N/A N/A N/A Q4 2024 Italy shall transfer
EUR 400 000 000 to the DTF.
Moreover, the investment
policy (“Accordo Finanziario”)
shall be in line with the
measure description.
M4C2-21 Investment 3.2
Equity injection
into the Digital
Transition Fund
(“DTF”)
Milestone Adoption of a
report
Adoption of a
report
N/A N/A N/A Q2 2026 Italy shall transmit a report
outlining the actions taken by
DTF to implement the
investment policy, including
the steps taken for the
implementation of the financial
products that the equity is
expected to support, as well
as the expected steps to be
taken for further implementing
331
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each
milestone and target Unit of
measure Baseline Goal Quarter Year
those products.
The report shall also indicate
the amounts invested in
direct/indirect manner and in
each financial product.
M4C2-22 Investment 2.1:
IPCEI Target
Number of
projects
supported
N/A Number 0 20 Q2 2025
Award concession decrees
are issued by Ministry of
Enterprises and Made in Italy
to support at least 20 IPCEI
projects.
332
L. MISSION 5 COMPONENT 1: Employment policy
The measures under this component of the Italian recovery and resilience plan introduce a
comprehensive and integrated reform of active labour market policies (ALMPs) and vocational
training. Strengthening ALMPs and improving the capacity building of public employment services
(PES), including their integration with education and training providers and private operators, are
expected to increase services’ efficacy. In addition, the measures of this component aim at reducing
social vulnerabilities to shocks, in particular by tackling undeclared work in all its forms and sectors
by setting more effective sanctions along with stronger incentives to work legally. Furthermore, this
component promotes gender equality (equal pay) through the gender equality certification system. It
also invests in young people by increasing the quantity and quality of training programmes, for
instance, through the participation to the Universal Civil Service programme.
The implementation of these measures is expected to contribute addressing the challenges covered by
the 2020 country-specific recommendation 2 on labour market urging Italy to “Mitigate the
employment impact of the crisis, including through […] active support to employment”, the 2020
country-specific recommendation 2 to “support skills (…) including digital ones”, the 2019 country-
specific recommendation 2 to “step up efforts to tackle undeclared work, ensure that active labour
market and social policies (…) reach out notably to young people and vulnerable groups. Support
women’s participation to the labour market”, and the 2019 country-specific recommendation 2 to
“foster up-skilling, including by strengthening digital skills”.
L.1. Description of the reforms and investments for non-repayable
financial support
Reform 1 - The Active Labour Market Policies (ALMPs) and Vocational Training
The objective of this reform is to support the active labour market system to provide personalised
plans that include employment, training and social services. This measure consists in the creation of a
National Programme for the Guaranteed Employability of Workers (GOL), supporting in particular
the most vulnerable categories (women, long-term unemployed, young and older workers and people
with disabilities), and in carrying out training programmes for adult learning.
Investment 1 - Strengthening Public Employment Services (PES)
The objective of this investment is to allow the efficient delivery of employment and training services.
The measure consists in the Public Employment Services carrying out activities, including for
example: infrastructural investments, establishment of regional observatories of local labour markets,
upgrade of the IT system, professional training of staff, and institutional communication and outreach.
Reform 2 - National Plan tackling undeclared work
The objective of this measure is to support the job quality and working conditions by preventing and
tackling undeclared work, labour exploitation (so called “caporalato”), and other forms of irregular
work. This measure consists in legislative and non-legislative actions including: reinforcing labour
inspections and sanctions, providing incentives to regular work, training job centre operators,
delivering a national information campaign, improving the governance to combat undeclared work, as
well as specific actions to address labour exploitation in agriculture.
333
Investment 2 - Gender Equality Certification System
The objective of this measure is to increase women’s participation in the labour market and contribute
to improving women’s working conditions. This investment consists in the creation of the national
gender equality certification system and in the provision of the gender equality certification to at least
3000 undertakings. .
Investment 3 - Strengthening the Dual System
The objective of this measure is to support young people and adults without secondary education in
accessing employment opportunities. This investment consists in expanding participation in the “dual
system” for students in formal and vocational education and training (VET), including through
apprenticeships.
Investment 4 - Strengthening of the Universal Civil Service
The objective of this measure is to increase the number of young people involved in non-formal
learning, and increase their knowledge and skills. This investment consists in ameliorating the
Universal Civil Service programme and increase the number of participants.
334
L.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
M5C1-1
Reform 1- ALMPs
and Vocational
Training
Milestone
Entry into force of
the Inter-
Ministerial Decree
establishing a
National
programme for the
Guaranteed
Employability of
Workers (GOL)
and an Inter-
Ministerial Decree
establishing a
National Plan for
New Skills
Provision in the
Inter-Ministerial
Decrees
indicating the
entry into force
of the two inter-
ministerial
decrees,
following
agreements at
the State-
Regions
Conference on
the Programme
GOL and
National Plan for
New Skills
N/A N/A N/A Q4 2021
The acts for GOL shall as a
minimum: (i) define the essential
elements and their standards of
Public Employment Services (PES),
including skills forecasting,
personalised training plans,
guidance and job coaching, to
ensure the effective provision of
personalised employment services
according to common and uniform
standards throughout the national
territory, (ii) ensure that upskilling
and reskilling training activities
provided by Public Employment
Services (PES) are fully in line with
the National Plan for New Skills,
including digital skills, (iii) ensure
that Public Employment Services
(PES) are targeted to the needs of
recipients, (iv) ensure that Public
Employment Services (PES) target
as priority the most vulnerable; (v)
set up a target of a minimum of
25% of beneficiaries of the
Guaranteed Employability of
Workers programmes as recipients
of relevant training, with a particular
335
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
focus on digital skills and with a
priority for the most vulnerable; (vi)
set new mechanisms which
strengthen and make structural the
cooperation between public and
private systems, including in
relation to the identification of the
relevant skill needs and the
provision of job offers. The Decree
establishes that recipients of social
safety nets shall access the
services provided under the
National Programme Guaranteed
Employability of Workers within 4
months from the moment in which
they mature the right to social
safety nets. The acts for the
National Plan for New Skills shall as
a minimum: (i) defines common
standards and essential levels of
vocational training throughout the
national territory, (ii) targets both
employed and unemployed and
persons with the goal to enhance
their digital skills and encourage
lifelong learning. (iii) Identify skills
and relevant standards based on a
cooperation between the public and
private systems, (iv) take into
336
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
account the different needs of the
target groups considered which, as
a minimum, shall include the most
vulnerable, (v) encompass all
relevant sectoral strategies as to
have a comprehensive approach,
including the national strategic plan
for adult competencies.(vi)
incorporate the provision for the
development a forecasting system
for new competencies needed in
the short-medium term within the
labour market.
M5C1-2
Reform 1 -
ALMPs and
Vocational
Training
Milestone
Entry into force at
the Regional level
of all plans for the
Public
Employment
Services (PES)
Provision
indicating the
entry into force
of the plans
adopted by the
Regions and
activities
executed
N/A N/A N/A Q4 2022
The national regulation of the
Guaranteed Employability of
Workers (GOL) Programme shall
envisage the definition at regional
level of the necessary operational
activities to implement the
Programme. In order to ensure
coherence between the national
regulation and the regional
implementation, regional Plans for
the Public Employment Services
(PES) shall be adopted.
In addition to adopting the Plans,
Regions execute the activities
based on the Plans, reaching at
337
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
least 10% of the envisaged
beneficiaries of the Programme
(final target 3 000 000 people).
The entry into force of the Plans for
the Public Employment Services
(PES) shall allow to fully implement
the Guaranteed Employability of
Workers (GOL) Programme.
M5C1-3
Reform 1 -
ALMPs and
Vocational
Training
Target
People benefitting
from the
Guaranteed
Employability of
Workers (GOL)
programme
N/A Number 0 3 000 000 Q4 2025
At least 3 000 000 people shall
benefit from the Guaranteed Employability of Workers (GOL) programme.
Furthermore, the essential levels of services (‘Livelli essenziali delle prestazioni’), as defined in the GOL programme, shall be available in at least 80% of Public Employment Services (PES).
M5C1-4
Reform 1 -
ALMPs and
Vocational
Training
Target
People
participating in
training
programmes
N/A Number 0 600 000 Q4 2025
At least 600 000 among the
beneficiaries of the GOL programme shall participate in training, of which at least
300 000 shall participate in training
on digital skills.
Lists of selected beneficiaries of the training programmes “Progetto per l’autoimpiego” and “Fondo nuove
338
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
competenze” shall be published.
M5C1-4bis
Reform 1 -
ALMPs and
Vocational
Training
Target
People
participating in
training
N/A Number 600 000 800 000 Q2 2026
At least 799 900 people shall
participate in training through the
GOL programme.Training under the
GOL programme may also be
provided via the “Educazione
Digitale per l’Occupazione” (EDO)
platform.
Furthermore, at least 100 people
shall participate in training through
“Fondo nuove competenze” or
“Progetto per l’autoimpiego”.
M5C1-6
Investment 1 -
Strengthening
Public
Employment
Services (PES)
Target
Public
Employment
Services (PES)
are implementing
the activities
envisaged in the
Strengthening
Plan over the
three years period
2021-2023
N/A Number 0 250 Q4 2022
At least 250 Public Employment
Services (PES) have completed at
least 50% of the activities
envisaged in the ‘Strengthening
Plan’ over the three years period
2021-2023.
These activities are in line with the
central Strengthening Plan and
further defined at regional level, on
the basis of a need analysis and
allocated resources.
These activities include: (I)
renovation and refurbishment of
current locations of Public
339
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
Employment Services (PES) and
purchase of new ones; (II) further
implementation of the IT system, in
the perspective of a national
interoperability; (III) professional
training of staff; (IV) institution of
regional observatories of local
labour markets; (V) institutional
communication and outreach.
Infrastructural activities are not
included in this target.
Equal balance is ensured on the
achievement of the target in terms
of territorial distribution (North,
Centre, and South).
M5C1-7
Investment 1 -
Strengthening
Public
Employment
Services (PES)
Target
Public
Employment
Services (PES)
have finalised the
activities
envisaged in the
Strengthening
Plan
N/A Number 0 326 Q4 2025
At least 326 Public Employment
Services (PES) and regional
agencies have finalised the
activities envisaged in the regional
plans for strengthening public
employment centres (Piani regionali
di potenziamento dei centri per
l’impiego), including for example: IT
upgrades, staff training,
establishment of regional
observatories of local labour
markets and communication
340
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
campaigns.
M5C1-7bis
Investment 1 -
Strengthening
Public
Employment
Services (PES)
Target
Infrastructural
activities in Public
Employment
Services (PES)
N/A Number 0 270 Q2 2026
At least 270 Public Employment
Services (PES) and regional
agencies premises have undergone
renovation and/or refurbishment or
have been acquired, as envisaged
in the regional plans for
strengthening public employment
centres (Piani regionali di
potenziamento dei centri per
l’impiego).
341
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
M5C1-8 Reform 2 -
Undeclared Work Milestone
Entry into force of
a National Plan
and
implementation
Road Map to fight
undeclared work
across all
economic sectors
Provisions in the
law indicating
the entry into
force of the
National Plan
and
establishment of
the inter-
institutional
working group
that will be
responsible for
the creation of
the National Plan
and
Implementation
Road Map
N/A N/A N/A Q4 2022
Adoption of a National Plan and
time-bound (one year)
Implementation Road Map to fight
undeclared work across all
economic sectors. The National
Plan shall build upon the general
strategy to combat undeclared work
and on the multi-agency approach
used to adopt the National Plan
against Labour Exploitation in the
agriculture sector - “Piano triennale
di contrasto allo sfruttamento
lavorativo in agricoltura e al
caporalato (2020-2022)”. The
National Plan and the Road Map for
Implementation shall include at
least the following: (I) measures to improve the
production, collection and timely
distribution of granular data on
undeclared work; (II) introducing direct and indirect
measures to transform undeclared
into declared work by ensuring that
benefits of operating in the declared
economy outweigh the costs of
working in the undeclared economy.
For instance, (a) deterrent
measures, such as strengthening
342
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
inspection and sanctions, and
preventive measures to promote
declared work, such as targeted
financial incentives, also through a
review and rationalising of existing
ones; (b) strengthening the link with
employment and social policy; (III) a national information campaign
on the “disvalue” of undeclared
work, addressed to employers and
workers, with the active
involvement of social partners; (IV) a governance structure to
ensure effective implementation of
actions;
(V) measures to overcome illegal
settlements to fight labour
exploitation in agriculture.
M5C1-9 Reform 2 -
Undeclared Work Milestone
Carry out actions
to fight undeclared
work
Actions carried
out N/A N/A N/A Q1 2024
The following actions shall be
carried out:
(I) Introduce measure(s) to improve
the collection of granular data on
undeclared work;
(II) Introduce measures to transform
undeclared into declared work:
343
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
a) deterrent measure(s) which may
include, but are not limited to,
strengthening inspections and
sanctions, as well as preventive
measure(s) to promote declared
work which may include, but are not
limited to, targeted financial
incentives;
b) measure(s) to strengthen the link
with active labour market policy
which may include, but are not
limited to, training of job centre
operators;
(III) Deliver a national information
campaign on the “disvalue” of
undeclared work;
(IV) Start of the works of the
governance structure to combat
undeclared work;
(V) Introduce measure(s) to
address labour exploitation in
agriculture.
M5C1-10 Reform 2 -
National Plan
tackling
Target
Increased number
of labour
inspections and
membership of the
N/A Number 0 102 895 Q4 2025
The average number of annual
inspections registered on the IT
systems of the National Labour
Inspectorate and of the ‘Carabinieri’
344
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
undeclared work network ‘rete del
lavoro agricolo di
qualità’
between 1 January 2023 and
31 December 2025 shall reach at
least 102 895. Moreover, 2 000
additional firms compared to June
2024 shall be included in the
membership list of the network ‘rete
del lavoro agricolo di qualità’
published on the INPS website.
M5C1-11 Reform 2 -
Undeclared Work Milestone
Carry out actions
to fight undeclared
work
Actions carried
out N/A N/A N/A Q1 2026
The following actions shall be
carried out:
- a study on the ‘Indici Sintetici di
Affidabilità Contributiva’ (ISAC
indicators) in 6 economic sectors;
- sending at least 12 000
compliance letters to firms identified
through ISAC indicators;
- publication of a study assessing
the impact of ‘PrestO’ and ‘Libretto
Famiglia’ vouchers on undeclared
work.
M5C1-12
Investment 2 -
Gender equality
certification
system
Milestone
Entry into force of
gender equality
certification
system and
accompanying
Provisions in the
law indicating
the entry into
force of the
Legislative acts
N/A N/A N/A Q4 2022
The gender equality certification
system and accompanying
incentive mechanisms for
companies shall cover at least the
following dimensions: growth
345
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
incentive
mechanisms for
companies
and
implementing
measures
governing the
definition of the
certification
system
opportunities for women, equal pay
for equal work, management
policies for gender diversity,
maternity protection.
Definition of the incentive
mechanisms for organisations that
undertake the certification process
and of the technical guidance.
Including: (I) elaboration of the
technical standards of the Gender
Certification System for companies;
(II) identification of the incentive
mechanism; (III) the measure shall
be accompanied by the set-up of an
IT system.
M5C1-14
Investment 2 -
Gender equality
certification
system
Target
Undertakings have
obtained the
gender equality
certification
N/A Number 0 3 000 Q2 2026
At least 3 000 undertakings have
obtained the gender equality
certification. Out of these, at least
1800 shall be SMEs, of which 500
have been granted technical
assistance and/or certification
services.
M5C1-15
Investment 3 -
Strengthening the
dual system
Target
Certificates issued
through the dual
education system
N/A Number 0 90 000 Q2 2025
At least 90 000 participation
certificates issued for years 2020-
2021, 2021-2022, 2022-2023,
2023-2024 or 2024-2025 to
346
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
students combining formal
education and learning experience
in the workplace.
M5C1-15bis
Investment 4 -
Universal Civil
Service
Milestone
Carry out actions
to increase the
participation of
young people,
simplify
procedures and
improve the quality
of the Universal
Civil Service
(UCS) projects
Actions carried
out N/A N/A N/A Q4 2024
The following actions shall be carried out:
1. Introduce measures to increase the participation of young people in the Universal Civil Service (UCS) programme;
2. Introduce measures to simplify procedures to reduce the administrative burden for the implementation of the Universal Civil Service (UCS) programme;
3. Introduce measures to improve the quality of Universal Civil Service (UCS) projects.
The actions carried out shall take into account the results of the TSI project (20IT06 – “Supporting design and implementation of the Universal Civil Service (UCS) RRP Project, to unlock youth employment opportunities”).
M5C1-16 Investment 4 -
Universal Civil Target
Certificates issued
for the Universal
Civil Service
N/A Number 0 166 670 Q2 2026 At least 166 670 certificates of
participation in the Universal Civil
Service issued for projects
347
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone
and target Unit of
measure Baseline Goal Quarter Year
Service projects launched in the four-year period
between 31 December 2020 and
31 December 2024
348
L.3. Description of the reforms and investments for the loan
Investment 5 - Creation of women’s enterprises
This measure shall consist of a public investment in a Facility, in order to incentivise private investment and
improve access to finance in Italy for the creation and growth of women’s enterprises in Italy through project
funding, mentoring, communication activities and entrepreneurial education services. The Facility shall
operate by providing subsidies and loans directly to the private sector.
The Facility shall be managed by Invitalia as the implementing partner. The Facility shall include the
following product lines:
• Fondo a sostegno dell’impresa femminile, which supports female-led business initiatives through
grants and interest-free loans; it also finances communication and training initiatives targeted to
female students and young women, as well as educational services aimed at disseminating women’s
entrepreneurial culture;
• Nuove imprese a tasso zero (NITO-ON), which is dedicated to the creation and growth of micro and
small businesses led mainly or entirely by young people or women financed through grants and
interest-free loans;
• Smart & Start Italia, which aims to foster innovative, technology-driven start-ups, particularly those
with strong digital or research-based elements, financed through loans; for start-ups located in
central and southern Italy a percentage of the loan can be converted into a non-repayable grant.
In order to implement the investment into the Facility, Italy and Invitalia shall sign an Implementing
Agreement that shall include the following content:
1. Description of the decision-making process of the Facility: The final investment decision of the
Facility shall be taken by an investment committee or other relevant equivalent governing body and
approved by a majority of votes from members who are independent from the government.
2. Key requirements of the associated investment policy, which shall include:
a) The description of the financial products and eligible final beneficiaries.
b) The requirement that all investments supported are economically viable.
c) The requirement to comply with the ‘Do no significant harm’ (DNSH) principle as set out in the
DNSH Technical Guidance (2021/C58/01). In particular, the investment policy shall exclude the
following list of activities and assets from eligibility: (i) activities and assets related to fossil
fuels, including downstream use84, (ii) activities and assets under the EU Emission Trading
System (ETS) achieving projected greenhouse gas emissions that are not lower than the relevant
benchmarks85, (iii) activities and assets related to waste landfills, incinerators86 and mechanical
biological treatment plants87.
84 Except for (a) assets and activities in power and/or heat generation, as well as related transmission and distribution
infrastructure, using natural gas, that are compliant with the conditions set out in Annex III of the ‘Do no significant
harm’ Technical Guidance (2021/C58/01) and (b) activities and assets under point (ii) for which the use of fossil fuels is
temporary and technically unavoidable for the timely transition towards a fossil fuel free operation. 85 Where the activity supported achieves projected greenhouse gas emissions that are not significantly lower than the
relevant benchmarks, an explanation of the reasons why this is not possible shall be provided. Benchmarks established
for free allocation for activities falling within the scope of the Emissions Trading System, as set out in the Commission
Implementing Regulation (EU) 2021/447. 86 This exclusion does not apply to actions under this measure in plants exclusively dedicated to treating non-recyclable
hazardous waste, and to existing plants, where the actions under this measure are for the purpose of increasing energy
349
d) The requirement that final beneficiaries of the Facility shall not receive support from other
Union instruments to cover the same cost.
3. The amount covered by the Implementing Agreement, the fee structure for the Implementing Partner
and the requirement to reinvest any reflows according to the investment policy of the Facility.
4. Monitoring, audit, and control requirements, including:
1. The description of the implementing partner’s monitoring system to report on the investment
mobilised.
2. The description of the implementing partner’s procedures that will ensure the prevention,
detection and correction of fraud, corruption, and conflicts of interests.
3. The obligation to verify the eligibility of every operation in accordance with the requirements
laid out in the Implementing Agreement before committing to finance an operation.
4. The obligation of carrying out risk-based ex-post audits in accordance with an audit plan of
Invitalia. These audits shall verify i) that the control systems are effective, including the
detection of fraud, corruption, and conflict of interests; ii) compliance with the DNSH principle,
and the State Aid rules; and iii) that the requirement that final beneficiaries of the Facility have
not received support from other Union instruments to cover the same cost is respected. The
audits shall also verify the legality of the transactions and that the conditions of the applicable
Implementing Agreement are being respected.
efficiency, capturing exhaust gases for storage or use or recovering materials from incineration ashes, provided such
actions under this measure do not result in an increase of the plants’ waste processing capacity or in an extension of the
lifetime of the plants; for which evidence is provided at plant level. 87 This exclusion does not apply to actions under this measure in existing mechanical biological treatment plants, where
the actions under this measure are for the purpose of increasing energy efficiency or retrofitting to recycling operations
of separated waste to compost bio-waste and anaerobic digestion of bio-waste, provided such actions under this measure
do not result in an increase of the plants’ waste processing capacity or in an extension of the lifetime of the plants; for
which evidence is provided at plant level.
350
L.4. Milestones, targets, indicators, and timetable for monitoring and implementation for the loan
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
M5C1-17
Investment 5 -
Creation of
women's
enterprises
Milestone
The Fund to support
women’s
entrepreneurship is
adopted
Ministerial Decree
for the
establishment of
the "Fondo Impresa
Donna" is approved
N/A N/A N/A Q3 2021
The Fund to support women’s
entrepreneurship is adopted by mean
of Ministerial Decree, which shall
establish a set of eligibility criteria in
line with the RRF objectives, including
the DNSH principle and signature of
the funding agreement and
operational agreements with the
financial intermediary(ies).
These funds shall constitute the "Fondo Impresa Donna", which shall implement the specific measure designed to support female entrepreneurship. Implementing measures shall be pre-agreed upon by the Ministry of Economic Development and the PCM- Department for Equal Opportunities, aiming at:
- strengthening the existing measures already managed by in-house bodies of Ministry of Economic Development (such as NITO-ON, Smart & Start) through a capital injection which shall be reserved only to women’s businesses; - providing for a top-up of the Female
Entrepreneurship Fund established
351
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
by 2021 Budget Law (from Q3 2022
on);
- designing accompanying measures,
monitoring and communication
campaigns. The PCM-Department for
Equal Opportunities shall implement a
multi-year information campaign to
promote female entrepreneurship, for
vocational guidance activities for
women of every age and female
students in universities towards
subjects and professions in which
women are underrepresented and the
creation of a communication platform.
M5C1-18
Investment 5 -
Creation of
women's
enterprises
Target
Financial support to
enterprises has been
committed
N/A Number 0 700 Q2 2023
Financial support has been
committed to at least 700 additional
enterprises compared to the baseline.
The implementation of support to
female entrepreneurship is
undertaken through instruments
already active (NITO-ON, Smart &
Start) and the new fund established
by the Budget Law for 2021 (women’s
enterprises supported until November
2020 by existing financial instruments
as the baseline).
352
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
M5C1-19bis
Investment 5 -
Creation of
women’s
enterprises
Milestone Implementing
Agreement
Entry into force of
the Implementing
Agreement
N/A N/A N/A Q4 2025 Entry into force of the Implementing
Agreement.
M5C1-20
Investment 5 -
Creation of
women’s
enterprises
Target
Transfer to Invitalia
and legal agreements
signed with final
beneficiaries
N/A Percentage
(%) 0 100 Q2 2026
Italy shall transfer
EUR 399 099 241,07 to Invitalia for
the Facility.
Invitalia shall have entered into legal
financing agreements with final
beneficiaries for an amount
necessary to use 100% of the RRF
investment into the Facility (taking
into account management and fees
for communication and educational
services).
Italy shall amend the implementing
agreement indicating the total
envelope of EUR 399 099 241,07
353
M. MISSION 5 COMPONENT 2: Social infrastructures, families,
communities and third sector
The planned reforms and investments included in this component aim at strengthening resilience by
supporting the integration and inclusion of the most vulnerable, along individual, family and social
dimensions. This component provides a national strategy for the active inclusion of vulnerable
population groups. The objectives of this component are: (I) strengthening the role for integrated
social services to support families, minors and adolescents, to support parenting skills and protect
vulnerable families as well as persons with disabilities, including through the enhancement of social
infrastructures involving the third sector; (II) improving the autonomy of people with disabilities, by
providing community and home-based social and health services and removing barriers to accessing
housing and job opportunities; (III) improving the inclusion of people in extreme marginalization and
housing deprivation (e.g. homeless people) through a wider offer of temporary accommodation
assistance facilities and services, personalized paths towards autonomy and personal resilience; (IV)
strengthening the availability of more affordable public and private housing and urban and territorial
regeneration; (V) developing the resilience capacity of the most vulnerable through the dissemination
of the culture of sport and the setup of sports infrastructures through the creation of urban parks where
sports activities may be combined with entertainment activities for the benefit of the communities.
The implementation of these measures is expected to contribute addressing the challenges covered by
the 2019 country-specific recommendations 2 on social policy urging Italy to “ensure that […] social
policies are effectively integrated and reach out notably to young people and vulnerable groups” and
by the 2020 country-specific recommendations 2 to “provide adequate (…) access to social
protection”.
M.1. Description of the reforms and investments for non-repayable financial support
Reform 1 - Framework Law for Disability
The main objective of the reform is to modify the legislation on disabilities and promote the de-
institutionalization (i.e., transfer from public or private institutions to their families or into
community-based homes) and autonomy of people with disabilities. This shall entail (I) strengthening
the offer of social services, (II) simplifying access to social and health services, (III) reforms of
disability assessments, (IV) promoting independent living projects, (V) promoting the work of teams
of experts that may support people with disabilities with multidimensional needs.
Reform 2 - Reform for non-self-sufficient elderly persons
The objective of this measure is to reform social services and improving the living conditions of non-
self-sufficient elderly people. This reform shall include: (I) simplifying older people’s access to
services through the creation of single points of social and health access, (II) identifying ways of
recognizing non-self-sufficiency based on the need for assistance, (III) providing a multidimensional
assessment, (IV) defining individualized projects that promote de-institutionalization. This reform is
anticipated by specific interventions envisaged by the Plan, included both in the health mission (M6),
with reference to projects that strengthen local health services and home care, and in this component,
with specific reference to the investment 1, intervention II aimed at the de-institutionalisation.
Investment 1 - Supporting vulnerable people and preventing institutionalization
The objective of this measure is to support vulnerable people and prevent institutionalisation. This
measure consists of interventions for vulnerable families and children, elderly people and social
workers in at least 85% of the Italian social districts.
354
Investment 2 - Autonomy patterns for people with disabilities
The objective of this measure is to increase the autonomy of people with disabilities, accelerating the
process of de-institutionalisation. The measure consists in providing access to housing or home-based
solutions, as well as digital technology and trainings.
Investment 3 - Housing First and Post Stations
The objective of this measure is to protect and support the inclusion of marginalised people. The
measure consists in two types of arrangements: the ‘housing first’ solutions, which involve
municipalities providing tailored projects and accommodation to individuals, small groups or families
up to 24 months; and the ‘post stations’ solutions, which consist of service and inclusion centres for
homeless people, offering essential services such as basic goods and mail distribution, meals and
healthcare.
355
M.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
M5C2-1
Reform 1-
Framework law
for disability
Milestone
Entry into force of the
Framework Law to
strengthen the
autonomy of people
with disabilities
Provision in the
law indicating
the entry into
force of the
Framework Law
N/A N/A N/A Q4 2021
The Framework Law, which consists
of a delegation law, shall strengthen
the autonomy of people with
disabilities, according to the
principles of UNCRPD and European
Strategy 2021-2030 for the rights of
persons with disabilities, which shall
as a minimum include: (i) the
comprehensive definition and
enhancement of the offer of social
services for disabled people together
with the promotion of de-
institutionalisation and independent
living, (ii) the simplification of
procedures for access to health and
social services, and (iii) the review of
procedures for assessing the
condition of disability, towards a
multidimensional evaluation of the
condition of every person.
People with disabilities are those
defined according to the principles of
the UN CRPD, by the Law n.
104/1992. In Italy the assessment
process is under competence of the
Regions and the person is evaluated
by the Local Health Services or by
356
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
the National Institute of Social
Welfare.
The law shall be proposed by the
Minister for the Disabilities for the
approval by the Council of Ministers,
according to the set road map.
The adoption of the Framework Law
shall be followed up by the
reorganization of local social
services, the definition of quality
standards and by providing ICT
platform to enhance and make more
efficient the services.
M5C2-2
Reform 1-
Framework law
for disability
Milestone
Entry into force of the
legislative decrees
developing the
provisions set out by
the Framework Law
to strengthen the
autonomy of people
with disabilities
Provisions in
the law
indicating the
entry into force
of the legislative
Decrees
N/A N/A N/A Q2 2024
The legislative decrees shall develop
the provisions set out by the
Framework Law to strengthen the
autonomy of people with disabilities:
(I) strengthening the offer of social
services, (II) simplifying access to
social and health services, (III)
reforms of disability assessments,
(IV) promoting independent living
projects, (V) promoting the work of
teams of experts that may support
people with disabilities with
multidimensional needs.
357
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
M5C2-3
Reform 2 -
Reform for non-
self-sufficient
elderly persons
Milestone
Entry into force of a
Framework Law
which strengthens
the actions in favour
of non self-
sufficiency elderly
people
Provisions in
the law
indicating the
entry into force
of the
Framework Law
which
strengthens the
actions in
favour of non
self-sufficiency
elderly people
N/A N/A N/A Q1 2023
The Framework Law proposed by the
Government shall strengthen the
actions in favour of non self-sufficient
elderly people. The law shall simplify
and provide Points of Single Contact
for social and health services, review
the procedures for assessing the
condition of non self-sufficient elderly
person, and increase the set of social
and health care services that may be
provided at home. The law shall also
identify the necessary financial
resources.
M5C2-4
Reform 2- Reform
for non-self-
sufficient elderly
persons
Milestone
Entry into force of the
legislative decree
that develops the
provisions set out by
the Framework Law
to strengthen the
actions in favour of
non self-sufficiency
elderly people
Provisions in
the law
indicating the
entry into force
of the legislative
Decree
N/A N/A N/ A Q1 2024
The legislative decree shall
concretize the provisions set out by
the Framework Law to strengthen the
actions in favour of non self-sufficient
elderly people, implementing the
different measures.
M5C2-5
Investment 1 -
Supporting
vulnerable people
and preventing
institutionalization
Milestone Entry into force of the
operational Plan
Provisions in
the law
indicating the
entry into force
of the
Operational
N/A N/A N/A Q4 2021
The operational plan shall define the
requirements of projects that may be
presented by local entities, which
relate to four dimensions: (i) support
to parents of children aged 0 to 17
years, (ii) support to elderly
358
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
plan of
interventions
autonomy, (iii) home services to
elderly, and (iv) support to social
workers.
The action ‘Support to parents’ shall
consist, as a minimum, of providing
support to recipient families for at
least 18 months with (i) a pre-
assessment of the family
environment and children situation,
(ii) an assessment of the situation
made a multidisciplinary team of
qualified professionals and (iii)
provide at least one of the following
services: home services,
participation to support groups for
parents and children; cooperation
among schools, families and social
services and/or shared family care
services.
The action ‘elderly autonomy’ shall
consist, as a minimum, of
reconverting retirement homes for
elderly people in groups of
autonomous apartments, equipped
with all necessary facilities and
services, including home automation,
telemedicine and remote monitoring.
359
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
The action ‘home services to elderly’
is aimed at providing specific training
to professionals for home services to
elderly people.
The action ‘support to social workers’
shall consist of supporting social
operators and reinforcing their
professionalism and sharing
competences, mainly by introducing
instruments for sharing competences
and provide supervision services to
operators to support the work of
operators
M5C2-7
Investment 2 -
Autonomy
patterns for
people with
disabilities
Target
Social districts have
delivered at least one
project in relation to
the renovation of
home spaces and/or
provision of ICT
devices to disabled
people, accompanied
by training on digital
skills
N/A Number 0 500 Q4 2022
At least 500 projects in relation to the
renovation of home spaces and/or
provision of ICT devices to disabled
people, accompanied by training on
digital skills is delivered by social
districts.
The satisfactory fulfilment of the
target also depends on the
satisfactory fulfilment of a secondary
target: at least 500 social districts
have delivered at least one project in
relation to the renovation of home
spaces and/or provision of ICT
devices to disabled people,
360
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
accompanied by training on digital
skills.
Delivery of at least one project from
at least 500 social districts, which
have participated in the non-
competitive procedure.
M5C2-9 Investment 3 -
Housing First and
Post Stations
Milestone
Entry into force of the
operational Plan
regarding projects on
Housing First and
Post Stations,
defining the
requirements of
projects that can be
presented by local
entities, and launch
of call for proposal
Provisions in
the law
indicating the
entry into force
of the
Operational
plan of
interventions
N/A N/A N/A Q1 2022
The operational Plan regarding
projects on Housing First and Post
Stations, shall define the
requirements of projects that may be
presented by local entities, and
launch of call for proposal.
Projects on Housing First envisage
that local entities make flats available
for single individuals, small groups or
families up to 24 months, preferably
through buildings’ refurbishment and
renovation of State property. This
shall be complemented by
development and autonomy
programmes.
Projects on Post Stations envisage
the development of service and
inclusion centres for homeless
people. This shall be complemented
by job placement programmes, in
collaboration with employment
361
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
centres.
362
M.3. Description of the reforms and investments for the loan
Investment 1 - Supporting vulnerable people and preventing institutionalization
The objective of this measure is to support vulnerable people and prevent institutionalisation. This measure
consists of interventions for vulnerable families and children, elderly people and social workers in at least
498 of the Italian social districts.
Investment 2 - Autonomy patterns for people with disabilities
The objective of this measure is to increase the autonomy of people with disabilities, accelerating the process
of de-institutionalisation. The measure consists in providing access to housing, and/or digital technology and
training.
Investment 3 - Housing First and Post Stations
The objective of this measure is to protect and support the inclusion of marginalised people. The measure
consists in two types of arrangements: the ‘housing first’ solutions, which involve municipalities providing
tailored projects and accommodation to individuals, small groups or families up to 24 months; and the ‘post
stations’ solutions, which consist of service and inclusion centres for people experiencing conditions that
may include but are not limited to severe material deprivation or homelessness, or in conditions of extreme
marginalization, offering essential services such as basic goods and mail distribution, meals and healthcare.
Investment 4 - Investments in projects of urban regeneration, aimed at reducing situations of
marginalization and social degradation
The objective of this measure is to reduce marginalisation and social degradation by increasing the social and
environmental quality of municipalities, as well as access to social and cultural services. The investment
consists in supporting projects of urban regeneration which may include but are not limited to interventions
in public areas, buildings, or for sustainable mobility..
Investment 5 - Urban Integration Plans (general projects and Overcoming illegal settlements to fight
labour exploitation in agriculture)
The objective of this measure is to regenerate large degraded urban areas. This investment entails three types
of interventions: (I) urban integrated plan projects , ; (II) housing solutions to overcome illegal settlements;
(III) a thematic fund (Fund of Funds), in collaboration with the EIB, to encourage private investment in
urban regeneration initiatives that support the climate and digital transitions.
Investment 6 - Innovative Plan for Housing Quality
The objective of this measure is to increase the quality or the quantity of public housing and to renovate
degraded areas. The investment consists in: (I) renovation (including energy efficiency interventions) and
expansion of public housing; (II) regeneration of urban spaces and public and private properties.
Investment 7 - Sport and Social Inclusion
The objective of this measure is to regenerate sport facilities and their sorroundings in urban areas. The
investment consists in supporting the construction or renovation of sport facilities.
363
M.4. Milestones, targets, indicators, and timetable for monitoring and implementation for the loan
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets) Indicative timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
M5C2-6
Investment 1 -
Supporting
vulnerable people
and preventing
institutionalization
Target
Actions to
support
vulnerable
people in
social districts
N/A Number 0 498 Q2 2026
At least 498 social districts shall finalise
at least one of the following actions: (I)
supporting vulnerable families and
children; (II) supporting autonomous
living of elderly people; (III) provision of
home social services to guarantee early
supported discharge and prevent
hospitalisation; (IV) supporting social
workers.
M5C2-8
Investment 2 -
Autonomy
patterns for
people with
disabilities
Target
Beneficiaries
have been
provided
access to
housing and/or
ICT devices
accompanied
by training on
digital skills
N/A Number 0 3 120 Q2 2026
At least 3 120 beneficiaries have been
provided access to housing and/or ICT
devices. The beneficiaries receiving ICT
devices shall also participate in training
on digital skills.
M5C2-10
Investment 3 -
Housing First and
Post Stations
Target
Housing First
and Post
Stations
projects
N/A Number 0 12 364 Q2 2026
For housing first, 1 318 signed
individualised projects (‘progetto
personalizzato’) attesting that temporary
accommodation was provided for a
minimum of 6 and a maximum of 24
months. In addition, for each
beneficiary, a certificate of completion of
works for the infrastructure of the
364
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets) Indicative timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
relative project shall also be provided.
For post stations, 11 046 signed
individualised projects (‘progetto
personalizzato’) attesting that the
service was provided. For each
beneficiary, a certificate of completion of
works for the infrastructure of the
relative project shall also be provided.
M5C2-11
Investment 4 -
Investments in
projects of urban
regeneration,
aimed at
reducing
situations of
marginalization
and social
degradation
Milestone
Award of all
public
contracts for
investments in
urban
regeneration to
reduce
situations of
marginalisation
and social
degradation,
with projects in
line with the
RRF
objectives
including the
DNSH
principle
Notification of
all public
contracts for
investments in
urban
regeneration to
reduce
situations of
marginalisation
and social
degradation,
with projects in
line with the
RRF
objectives
including the
DNSH
principle
N/A N/A N/A Q1 2022
Notification of all public contracts awarded to at least 300 municipalities of
more than 15 000 inhabitants for
investments in urban regeneration to reduce situations of marginalisation and social degradation, with projects in line with the RRF objectives including the DNSH principle.
The grants are awarded to
municipalities of more than 15 000
inhabitants which are not the provincial capitals, the provincial capital municipalities or the metropolitan city headquarters.
Projects of urban generation shall consist of at least one of the following interventions:
• Reuse and re-functionalization of
public areas and existing public
building structures for purposes of
365
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets) Indicative timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
public interest, including the
demolition of abusive works carried
out by private individuals in the
absence or total discrepancy from
the building permit and the
arrangement of the relevant areas;
• Improvement of the quality of the
urban landscape and of the social
and environmental fabric, including
through building renovation of
public buildings, with particular
reference to the development of
social and cultural, educational and
didactic services;
• Green, sustainable and smart
transport projects.
The maximum amounts per municipality
are the following:
EUR 5 000 000 for municipalities with
populations ranging from 15 000 to
49 999 inhabitants;
EUR 10 000 000 for municipalities with
a population of between 50 000 and
100 000 inhabitants;
366
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets) Indicative timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
EUR 20 000 000 for municipalities with
a population greater than 100 000
inhabitants and for municipalities that
are provincial capitals or metropolitan
cities.
M5C2-12
Investment 4 -
Investments in
projects of urban
regeneration,
aimed at
reducing
situations of
marginalization
and social
degradation
Target Projects
carried out N/A Number 0 1 080 Q2 2026
Administrative certificates confirming
that at least 1 080 projects, covering at
least 1 000 000 square meters, have
been carried out.
M5C2-13
Investment 5 -
Urban Integrated
Plans - general
projects
Milestone
Entry into force
of the
investment
Plan for urban
regeneration
projects in
metropolitan
areas
Provision of
the law
indicating the
entry into force
of the Plan for
urban
regeneration
projects in
metropolitan
areas
N/A N/A N/A Q4 2022
The investment Plan shall establish set
of criteria in line with the RRF
objectives, including the DNSH
principle. The projects shall refer to the
following type of interventions:
a) Maintenance for the reuse and re-
operation of public areas.
b) Improvement of the quality of urban
décor and the social and environmental
fabric.
c) Improvement of the environmental
quality and digital profile of the urban
367
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets) Indicative timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
areas.
M5C2-14
Investment 5 -
Urban Integrated
Plans - general
projects
Target Projects
carried out N/A Number 0 300 Q2 2026
Administrative certificates confirming
that at least 300 urban integrated plan
projects in 14 metropolitan cities,
covering a total area of at least
3 000 000 square meters, have been
carried out
M5C2-15
Investment 5 -
Urban Integrated
Plans -
Overcoming
illegal
settlements to
fight labour
exploitation in
agriculture
Milestone
Entry into force
of the
Ministerial
Decree setting
out the
mapping of
illegal
settlements is
adopted by the
“Tavolo di
contrasto allo
sfruttamento
lavorativo in
agricoltura”
and the
ministerial
decree to
allocate
resources is
adopted
Provision in
the law
indicating the
entry into force
of the
Ministerial
Decree
N/A N/A N/A Q1 2022
The Ministerial Decree shall allocate
resources on the basis of the mapping
of illegal settlements realised by the
“Tavolo di contrasto allo sfruttamento
lavorativo in agricoltura”. Standard of
temporary and long-term housing
solutions shall be defined.
368
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets) Indicative timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
M5C2-16
Investment 5 -
Urban Integrated
Plans -
overcoming
illegal
settlements to
fight labour
exploitation in
agriculture
Target
Projects on
housing and
set-up of
Platform
N/A 0 9 Q2 2026
9 projects are implemented in
compliance with the number of beds
and housing standards defined in the
agreements signed by the implementing
authoritiese.
The digital platform on labour
exploitation in agriculture (‘Sistema
informativo per il contrasto al
caporalato’) shall be set-up and allow
the use of the interactive dashboard.
M5C2-17
Investment 5 -
Urban Integrated
Plans - EIB Fund-
Of-Fund
Milestone
The Fund’s
investment
strategy is
approved by
the Ministry of
Finance (MEF)
Fund’s
Investment
Strategy is
approved by
the Ministry of
Finance (MEF)
N/A N/A N/A Q3 2022
The Fund’s investment strategy shall
define as a minimum: (i) the nature and
scope of the investments supported,
which shall promote sustainable urban
regeneration and development projects
and be in line with the RRF objectives,
including in relation to compliance with
the Do No Significant Harm principle, as
further specified in the Commission
guidance note of 12 February 2021, (ii)
the operations supported, (iii) the
targeted beneficiaries, which shall be
private promoters of financially self-
sustainable projects for which public
support is justified by a market failure or
the risk profile, and their eligibility
criteria, (iv) the eligibility criteria of
financial beneficiaries and their
selection through an open call; (v) the
369
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets) Indicative timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
inclusion of a specific line for decent
housing solutions for the workers in the
agriculture and industrial sector, and (vi)
provisions to re-invest potential reflows
for the same policy objectives, also
beyond 2026.
The contractual agreement with
entrusted entity requiring shall require
the use of the DNSH guidance.
M5C2-18
Investment 5 -
Urban Integrated
Plans - EIB Fund-
Of-Fund
Target
Legal
agreements
signed with
final
beneficiaries
for an
investment
value of
underlying
projects of at
least EUR
545 000 000
N/A EUR 0 545 000 000 Q4 2025
The selected financial intermediaries
shall have entered into legal financing
agreements with final beneficiaries for
an investment value of underlying
projects of at least EUR 545 000 000
(including RRF and private funding).
The Ministry of Economy and Finance
shall have completed the transfer of
EUR 272 000 000 to the European
Investment Bank.
M5C2-19
Investment 6 -
Innovation
Programme for
Housing Quality
Milestone
Regions and
Autonomous
Provinces
(including
municipalities
and/or
metropolitan
Agreements
with local
authorities are
signed
N/A N/A N/A Q1 2022
At least 15 Regions and Autonomous
Provinces (including municipalities
and/or metropolitan cities located in
those territories) signed the agreements
to redevelop and increase social
housing.
370
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets) Indicative timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
cities located
in those
territories)
signed the
agreements to
redevelop and
increase social
housing
Agreements signed with at least 15
Regions and Autonomous Provinces
involved in projects.
Building: new public housing
accommodations to:
- redevelop, reorganize and increase
the assets intended for public housing;
- re-functionalize areas, spaces and
public and private properties also
through the regeneration of the urban
and socio-economic fabric;
- improve the accessibility and safety of
urban areas and the provision of
services and urban-local infrastructures;
- regenerate areas and spaces already
built, increasing environmental quality
and improving climate resilience to
climate change also by means of
operations with impacts on urban
densification;
- identify and use innovative
management and inclusion models and
tools, social and urban welfare, as well
as participatory processes.
Housing units and public spaces
supported shall be intended as
371
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets) Indicative timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
benefitting from the activities described
in the related milestone.
M5C2-20
Investment 6 -
Innovation
Programme for
Housing Quality
Target
Number of
housing units
built,
purchased or
renovated
N/A Number 0 10 000 Q2 2026
At least 10 000 housing units shall be
built, purchased or renovated, and at
least 1 800 000 square meters of public
spaces shall be renovated.
At least EUR 100 million of RRF support
to the investment cost shall be
dedicated to energy efficiency
renovation of existing housing stock or
public infrastructure or to the
construction of buildings with a primary
energy consumption at least 20% lower
than the Nearly Zero Energy Buildings
requirement.
At least EUR 350 million shall be
dedicated to energy efficiency
renovation of existing housing stock or
public infrastructure resulting in primary
energy savings of at least 30%.
372
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets) Indicative timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
M5C2-21
Investment 7 -
The Sport and
Social Inclusion
project
Milestone
Award of all
public
contracts for
projects on
sport and
social inclusion
following a
public call for
proposal
Notification of
the award of
all public
contracts for
projects on
sport and
social inclusion
N/A N/A N/A Q1 2023
Notification of the award of public
contracts, which shall consist of at least
one of the following elements:
1. construction of new sport facilities,
located in the disadvantaged areas of
the country;
2. provision of sports equipment,
including the application of technology
to sport);
3. requalification and adaptation of
existing sports facilities (for example:
removal of architectural barriers, energy
efficiency, etc).
The project aims to ensure the
regeneration of urban areas through a
focus on sport facilities, in order to
promote social inclusion and integration,
especially in the most deprived areas of
Italy.
Selection criteria shall guarantee that at
least 50% of the investment shall be
allocated to new constructions,
compliant with the relevant
requirements of footnote 5 of Annex VI
of the Regulation (EU) 2021/241.
M5C2-22 Investment 7 - Target Administrattive N/A Number 0 100 Q2 2026 Administrative certificates confirming
373
Sequential
Number
Related
Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets) Indicative timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
Sport and Social
Inclusion
certificates for
interventions
related to the
construction or
renovation of
sport facilities
that at least 100 interventions related to
construction or renovation of sport
facilities covering a total area of at least
200 000 square meters have been
carried out
374
N. MISSION 5 COMPONENT 3: Special interventions for territorial cohesion
This component of the recovery and resilience plan includes two intervention areas: i) Plan for the resilience
of internal, peripheral and mountain areas; ii) Projects for the development of the South, including
investments to tackle educational poverty, to consolidate rural pharmacies as local health services, the
enhancement of assets confiscated from organised crime and infrastructural investment in Special Economic
Zones. These measures aim at tackling the territorial divide in three domains: demographics and services;
skill development; investment.
The investments and the reforms under this component shall contribute addressing the country specific
recommendations addressed to Italy in 2019 and 2020 on the need to “Focus investment-related economic
policy on research and innovation, and the quality of infrastructure, taking into account regional disparities”
(country specific recommendation 2019.3); “improve educational outcomes” (country specific
recommendation 2019.2); “Strengthen the resilience and capacity of the health system […]” (country
specific recommendation 2020.1); “ensure adequate […] and access to social protection” (country specific
recommendation 2020.2).
N.1. Description of the reforms and investments for non-repayable financial support
Investment 1.1. Inner Areas – 1: Enhancement of community social services and infrastructures
The intervention aims at tackling the issues of social exclusion and marginalisation, by intensifying the
provision of services through the increase of funds for public services delivered by the local authorities (the
delivery mechanism consists in providing grants to the municipalities). Financed projects may concern:
home care services for the elderly; community nurses and midwives; strengthening of small hospitals (those
without first aid) or some basic services (i.e. radiology, cardiology, gynaecology) and outpatient centres;
infrastructures for helicopter rescue; strengthening centres for the disabled; counselling centres, cultural
services, sports services and migrant reception. The intervention shall envisage either the creation of new
services and infrastructures or the improvement of existing ones through an increase in the number of
recipients or in the quality of supply.
In order to ensure that the measure complies with the ‘Do no significant harm’ Technical Guidance
(2021/C58/01), the eligibility criteria contained in terms of reference for upcoming calls for projects shall
exclude the following list of activities: (i) activities related to fossil fuels, including downstream use88; (ii)
activities under the EU Emission Trading System (ETS) achieving projected greenhouse gas emissions that
are not lower than the relevant benchmarks89; (iii) activities related to waste landfills, incinerators90 and
mechanical biological treatment plants91; and (iv) activities where the long-term disposal of waste may cause
88 Except projects under this measure in power and/or heat generation, as well as related transmission and distribution
infrastructure, using natural gas, that are compliant with the conditions set out in Annex III of the ‘Do no significant
harm’ Technical Guidance (2021/C58/01). 89 Where the activity supported achieves projected greenhouse gas emissions that are not significantly lower than the
relevant benchmarks an explanation of the reasons why this is not possible should be provided. Benchmarks established
for free allocation for activities falling within the scope of the Emissions Trading System, as set out in the Commission
Implementing Regulation (EU) 2021/447. 90 This exclusion does not apply to actions under this measure in plants exclusively dedicated to treating non-recyclable
hazardous waste, and to existing plants, where the actions under this measure are for the purpose of increasing energy
efficiency, capturing exhaust gases for storage or use or recovering materials from incineration ashes, provided such
actions under this measure do not result in an increase of the plants’ waste processing capacity or in an extension of the
lifetime of the plants; for which evidence is provided at plant level. 91 This exclusion does not apply to actions under this measure in existing mechanical biological treatment plants, where
the actions under this measure are for the purpose of increasing energy efficiency or retrofitting to recycling operations
of separated waste to compost bio-waste and anaerobic digestion of bio-waste, provided such actions under this measure
375
harm to the environment. The terms of reference shall additionally require that only activities that comply
with relevant EU and national environmental legislation may be selected.
Investment 1.1.2: Territorial Proximity health facilities
The objective of the measure is to reinforce the role of rural pharmacies in the provision of health services to
the local population, for example integrated home assistance and patient monitoring, in turn facilitating the
interaction between the patient and the national healthcare system. The investment consists in the provision
of financial support to rural pharmacies.
Investment 1.3: Structured socio-educational interventions to combat educational poverty in the South
supporting the Third Sector
The objective of this measure is to supply socio-educational services to minors, increase access to childcare,
educational opportunities, and prevent school dropout and early school leaving. The investment consists in
educational support activities led by third sector organisations.
do not result in an increase of the plants’ waste processing capacity or in an extension of the lifetime of the plants; for
which evidence is provided at plant level.
376
N.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative timeline for
completion
Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
M5C3-1
Investment 1.1.1:
Inner Areas-
Enhancement of
community social
services and
infrastructures
Milestone
Award of the tender for
the interventions to
improve social services
and infrastructures in
Inner Areas and for the
support to pharmacies
in municipalities of less
than 3 000 inhabitants
Notification of
the award of all
public contracts
for the
interventions
N/A N/A N/A Q4 2022
The intervention shall create new services
and infrastructures or shall improve the
existing ones through an increase in the
number of recipients or in the quality of
supply.
The launch of all competitive calls shall be
done with terms of reference including
eligibility criteria that ensure that the
selected projects comply with the ‘Do no
significant harm’ Technical Guidance
(2021/C58/01) through the use of an
exclusion list and the requirement of
compliance with the relevant EU and
national environmental legislation.
Inner Areas are those identified in the
Strategia Nazionale Aree Interne; Rural
Pharmacies are defined on the basis of Law.
27 March 1968, n.221.
M5C3-3
Investment 1.1.2:
Territorial
proximity health
facilities
Target
Support to rural
pharmacies in
municipalities, hamlets
or settlements of less
than 5 000 inhabitants
N/A Number 0 500 Q4 2023
At least 500 rural pharmacies in
municipalities, hamelets or settlements of
less than 5 000 inhabitants shall benefit from
the intervention.
377
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative timeline for
completion
Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
(first batch)
M5C3-8
Investment 1.3:
Structured socio-
educational
interventions to
combat
educational
poverty in the
South supporting
the Third Sector
Target Educational support to
minors (first batch) N/A Number 0 20 000 Q2 2023
At least 20 000 minors aged up to 17 years
shall receive educational support. The
projects of educational support shall focus
on one of the following areas:
• Interventions for children aged zero to six
aimed at strengthening the conditions of
access to nursery and kindergarten services
and at supporting parenthood;
• Interventions for children aged five to ten
aimed at guaranteeing effective educational
opportunities and early prevention of school
dropout, bullying and other phenomena of
distress;
• Interventions for children aged 11-17,
which aim at improving education supply
and preventing the phenomenon of early
school leaving.
Key elements of the tender:
- Public notices shall account for at least
EUR 50 000 000 each - The third sector entities projects shall last
at least one year and up to two years.
378
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative timeline for
completion
Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
The actions shall take place in the regions of
Abruzzo, Basilicata, Campania, Calabria,
Molise, Puglia, Sardegna and Sicilia.
M5C3-9
Investment1.3:
Structured socio-
educational
interventions to
combat
educational
poverty in the
South supporting
the Third Sector
Target Educational support to
minors (second batch) N/A Number 20 000 44 000 Q4 2025
Registration forms and enrolment
confirmations for at least 44 000 minors
aged from zero to 17 years who are
provided with educational support.
379
N.3. Description of the reforms and investments for the loan
Reform 1: Simplification of the procedures and strengthening of the Commissioner in the Special
Economic Zones
The reform shall contribute to the simplification of the governance system and streamline the
implementation time of interventions in the Special Economic Zones. The reform shall establish the Digital
One Stop Shop for the Special Economic Zones and strengthening of the Commissarial Role.
Investment 1.1.2: Territorial Proximity health facilities
The objective of the measure is to reinforce the role of rural pharmacies in the provision of health services to
the local population, for example integrated home assistance and patient monitoring, in turn facilitating the
interaction between the patient and the national healthcare system. The investment consists in the provision
of financial support to rural pharmacies.
Investment 1.4: Infrastructural investments for the Special Economic Zones (SEZ)
The investment aims to ensure the impact of the reform introducing the Special Economic Zones (SEZ). The
investment consists in supporting infrastructural interventions around port areas (“Last mile” links; digital
logistics, urbanization or energy and environmental efficiency; ports’ infrastructures).
380
N.4. Milestones, targets, indicators, and timetable for monitoring and implementation for the loan
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
M5C3-10
Reform1:
Simplification of the
procedures and
strengthening of the
Commissioner in
the Special
Economic Zones
Milestone
Entry into force
of the regulation
to simply the
procedures and
strengthen the
role of the
Commissioner
in the Special
Economic
Zones
Provision in the
regulation for the
entry into force of
the regulation to
simply the
procedures and
strengthen the role
of the
Commissioner in
the Special
Economic Zones
N/A N/A N/A Q4 2021
The regulation shall include: the
establishment of the Digital One Stop Shop for
the Special Economic Zones for the
simplification of procedures; provisions to
strengthen the role of the Commissioner in
ZES.
Special Economic Zones are specific areas
defined by the Law Decree 91/2017
(publication in the Official Journal 141/2017)
converted into law by the L. 123/2017
(published in the official Journal Mezzogiorno
188/2017).
M5C3-11
Investment 1.4:
Infrastructural
investments for the
Special Economic
Zone
Milestone
Entry into force
of Ministry
Decrees
approving
operational
plans for all
eight Special
Economic
Zones
Provision in the law
of indicating the
entry into force the
Ministry decrees.
N/A N/A N/A Q4 2021
The decree shall allocate resources to the
subjects responsible for implementation and
define specific conditions to avoid any
environmental impact of interventions.
The launch of all competitive calls shall be
done with terms of reference including
eligibility criteria that ensure that the selected
projects comply with the ‘Do no significant
harm’ Technical Guidance (2021/C58/01)
through the use of an exclusion list and the
requirement of compliance with the relevant
EU and national environmental legislation.
381
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
M5C3-12
Investment 1.4:
Infrastructural
investments for the
Special Economic
Zone
Target
Start of works
for
infrastructural
projects in the
Special
Economic Zone
N/A Number 0 53 Q4 2024
The infrastructural projects shall be uniquely
identified by their Codice Locale di Progetto
(CLP).
The works for at least 53 projects established
by the Decree allocating resources shall have
started.
M5C3-13
Investment 1.4:
Infrastructural
investments for the
Special Economic
Zone
Target
Finalisation of
infrastructural
projects in the
Special
Economic Zone
N/A Number 0 46 Q2 2026
Administrative certificates confirming that
projects have been carried out shall be issued
for at least 46 projects established by the
Decree allocating resources and uniquely
identified by their Codice Unico di Progetto
(CUP) and/or Codice Locale di Progetto
(CLP).The list of projects completed shall
include the following:
- Porto di Salerno. Area portuale. Consolidamento ed adeguamento funzionale di alcuni moli e banchine (CLP: G51B21003170006)
- Porto di Napoli. Area portuale. Prolungamento e rafforzamento della diga Duca D’Aosta (CUP: G65F20001560006)
- Porto di Salerno. Dragaggio del porto commerciale di Salerno e del canale di ingresso – fase 2 - Molo di ponente (CLP: G51B21003160006)
- Porto Canale Di Cagliari. Area portuale. Avamporti: realizzazione di nuovi
382
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
banchinamenti per l’ormeggio di navi traghetto roll-on roll-off, ro-ro (CLP: D21G06000020003)
M5C3-4
Investment 1.1.2:
Territorial proximity
health facilities
Milestone
Support to rural
pharmacies in
municipalities,
hamlets or
settlements of
less than 5 000
inhabitants
(second batch)
Adoption of decrees
authorising the final
disbursement
N/A N/A N/A Q2 2026
Decrees authorizing the final disbursement
towards at least 1 500 rural pharmacies in
municipalities, hamlets or settlements of less
than 5 000 inhabitants.
383
O. MISSION 6 COMPONENT 1: Proximity networks, facilities and
telemedicine for territorial healthcare assistance
The objective of this component is to strengthen the Italian National Health Service (NHS) by inter
alia enhancing the protection against environmental and climate-change related health risks and better
responding to the communities’ needs regarding local care and assistance. Local healthcare assistance
is fragmented and subject to regional disparities that result in different levels of healthcare provisions
and health outcomes across regions. The provision of integrated home care services is considered to
be low, and the different healthcare and social service providers are considered to be only weakly
integrated. Moreover, the capacity of the Italian National Health Service (NHS) to address health risks
related to environmental exposure and climate change has been tested by several environmental crisis
and emergencies that highlighted the challenges due to a lack of sufficient prevention actions. The
objective of this component of the Italian recovery and resilience plan is to strengthen the Italian
National Health Service (NHS) by inter alia enhancing the protection against environmental and
climate-change related health risks and better responding to the communities’ needs regarding local
care and assistance.
The investments and reforms of this component shall contribute addressing the country-specific
recommendations addressed to Italy in 2019 and 2020 on the need to “focus investment-related
economic policy on research and innovation, and the quality of infrastructure, taking into account
regional disparities (country-specific recommendation 3, 2019), “strengthen the resilience and
capacity of the health system, in the areas of health workers, critical medical products and
infrastructure” (country-specific recommendation 1, 2020) and to “focus investment on the green and
digital transition, in particular on […] reinforced digital infrastructure to ensure the provision of
essential services” (country-specific recommendation 3, 2020).
O.1. Description of the reforms and investments for non-repayable financial support
N/A
O.2. Milestones, targets, indicators, and timetable for monitoring and
implementation for non-repayable financial support
N/A
384
O.3. Description of the reforms and investments for the loan
Reform 1: Definition of a new organisational model for Territorial healthcare assistance
network.
The reform constitutes a preparatory element for the investments of the component. It shall establish a
new model of territorial healthcare assistance and create a new institutional structure of Health-
Environment-Climate prevention. This shall be achieved through:
1. Establishment of a new organisational model for the territorial healthcare assistance network
through the definition of a regulatory framework which identifies structural, technological and
organisational standards.
2. Definition of a new institutional structure of Health-Environment-Climate prevention, following
an integrated approach (“One Health”) and a holistic vision (“Planetary Health”).
Investment 1.1: Community Health Houses to improve territorial health assistance.
The objective of the measure is to establish Community Health Houses.
The investment consists in activating and aggregating primary care services as well as implementing
(energy efficient) assistance delivery centres for an integrated response to care needs.
Investment 1.2: Home as the first place of care and telemedicine
The objective of the measure is to boost home care and the large-scale adoption of telemedicine
solutions and supporting healthcare innovation.
The investment consists of hardware and increased service provision, the establishment of Territorial
Coordination Centres (“Centrali Operative Territoriali”), financing projects for diagnostics and
monitoring, creating a national platform for screening telemedicine projects, and ad-hoc research
initiatives on digital health and care technologies.
Investment 1.3: Strengthening Intermediate Healthcare and its facilities (Community Hospitals)
The objective of the measure is to increase the number of intermediate healthcare facilities.
The investment consist in activating care services in community hospitals, healthcare facilities for
patients who, following an episode of minor acuity or the relapse of chronic pathologies, require low-
intensity and short-term clinical interventions.
385
O.4. Milestones, targets, indicators, and timetable for monitoring and implementation for the loan
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
M6C1-1
Reform 1: Definition
of a new
organisational
model for Territorial
healthcare
assistance network
Milestone
Entry into force
of the
secondary
legislation
(Ministerial
Decree)
envisaging the
reform of the
organisation of
healthcare.
Provision in the
law indicating
the entry into
force of the
legislation l
N/A N/A N/A Q2 2022
Entry into force of the secondary legislation
(Ministerial Decree) providing for:
- Definition of a new organizational model of
the territorial healthcare assistance network,
through the definition of a regulatory
framework which identifies structural,
technological and organizational standards
across regions; definition of a new institutional
structure of Health-Environment-Climate
prevention, according to the "One-Health"
approach.
M6C1-2
Investment 1.1:
Community Health
Houses to improve
territorial health
assistance
Milestone
Approval of an
Institutional
Development
Contract
Notification of
the approval by
Ministry of
Health and
regions
N/A N/A N/A Q2 2022
Approval of an Institutional Development
Contract (Contratto Istituzionale di Sviluppo),
with the Italian Ministry of Health as the
responsible and implementing Authority and
the participation of regional Administrations
together with the other entities concerned for
Community health houses:
The Institutional Development Contract is a
governance tool that shall list all the suitable
parties identified for the implementation of the
Community Health House to Improve territorial
health assistance. The contract shall also
identify obligations that each Italian region will
assume to guarantee the achievement of the
386
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
expected results concerning Community
Health House.
The contract aimed at supporting territorial
cohesion, development and economic growth,
and at accelerating the implementation of
complex interventions. The Institutional
Development Contract is particularly useful for
major projects or investments articulated in
individual interventions functionally connected
to each other, which require an integrated
approach and the use of European investment
structural funds and national funds also
included in plans and operational programmes
funded from national and European resources.
M6C1-3
Investment 1.1:
Community Health
Houses to improve
territorial health
assistance
Target
Community
Health Houses’
services are
activated
N/A Number 0 1 038 Q2 2026
Independent expert reports confirming the
activation of services, according to the
standards defined by the mandatory items of
Table 4 in Annex 1 Section 5 of DM 23 May
2022 n.77 in at least 1038 Community Health
Houses.
At least 40% of the RRF support to the
investment cost shall be dedicated to the
construction of new buildings (Intervention field
025 ter) compliant with the requirements of
footnote 5 of Annex VI of the Regulation (EU)
2021/241 or to the energy-efficiency
renovation of buildings (Intervention field 026)
387
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
as certified by the independent expert.
M6C1-4 Investment 1.2:
Home as the first
place of care and
telemedicine
Milestone Approval of the
Guidelines
containing the
digital model for
the
implementation
of Home Care
Guidelines
approved by
Ministry of
Health
N/A N/A N/A Q2 2022 The guidelines shall streamline the processes
necessary to enhance home care through the
development of remote monitoring techniques
and home automation.
M6C1-5
Investment 1.2:
Home as the first
place of care and
telemedicine
Milestone
Institutional
Development
Contract
approved by
Ministry of
Health and
regions
Notification of
the approved
contract
N/A N/A N/A Q2 2022
Approval of an Institutional Development
Contract (Contratto Istituzionale di Sviluppo),
with the Italian Ministry of Health as the
responsible and implementing Authority and
the participation of regional Administrations
together with the other entities concerned for
Home Care.
The Institutional Development Contract shall
establish for each intervention or category of
interventions, the time schedule, the
responsibilities of the contractors, the
evaluation and monitoring criteria and the
sanctions for any non-compliance. It also
defines the conditions of potential partial
defunding of interventions or the allocation of
the relevant resources to another level of
government, in compliance with the principle of
subsidiarity.
388
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
M6C1-6
Investment 1.2:
Home as the first
place of care and
telemedicine
Target Home care
treatment N/A Number 645 590 1 487 590 Q2 2025
Delivery of home care treatment for people
over 65 shall reach an annual value of at least
1 487 590 as measured by the SIAD05bis
indicator – “Over 65s Treated in SIAD
(Sistema informativo Assistenza domiciliare) in
Relation to the Elderly Population” in the
Agenas dashboard.
M6C1-7
Investment 1.2:
Home as the first
place of care and
telemedicine
Target
Coordination
Centres fully
operational
(second batch)
N/A Number 0 480 Q4 2024
The crucial point of this intervention is the
entry in operation of at least 480 Territorial
Coordination Centres (“Centrali Operative
Territoriali”) with the function of coordinating
and linking the various territorial, social-health
and hospital health services, as well as the
emergency-urgency network, in order to
ensure continuity, accessibility and integration
of care.
M6C1-8
Investment 1.2:
Home as the first
place of care and
telemedicine
Target
At least one
telemedicine
project assigned
to each region
(considering
both projects
that will be
implemented in
the individual
region and
those that may
N/A Number 0 20 Q4 2023
The national telemedicine strategy shall
promote and finance the development and
scale-up of new telemedicine projects and
solutions within regional healthcare systems,
and as such it represents a key (technological)
enabler for the implementation of the
enhanced remote care approach to health,
with a particular focus on chronic patients.
389
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
be developed
as part of
consortia
among regions)
M6C1-9
Investment 1.2:
Home as the first
place of care and
telemedicine
Target
Assistance by
telemedicine
tools
N/A Number 0 300 000 Q2 2026
The indicator on assistance by telemedicine
tools, based on National Telemedicine
Platform’s (PNT) indicators and monitored
through the Agenas dashboard, shall reach a
value of at least 300 000 people.
M6C1-10
Investment 1.3:
Strengthening
Intermediate
Healthcare and its
facilities
(Community
Hospitals)
Milestone
Approval of an
Institutional
Development
Contract
(Contratto
Istituzionale di
Sviluppo)
Notification of
the approval of
the Institutional
Development
Contract
N/A N/A N/A Q2 2022
Approval of an Institutional Development
Contract (Contratto Istituzionale di Sviluppo),
with the Italian Ministry of Health as the
responsible and implementing Authority and
the participation of regional Administrations
together with the other entities concerned for
Community hospitals.
The Institutional Development Contract shall
list all suitable sites identified for the
investments, as well as the obligations that
each region shall assume to guarantee the
achievement of the envisaged result. In case
of breach by any region the Ministry of Health
shall proceed to the commissioner “ad acta”.
With regards to the technology park of the
facilities, i.e. all the tools, licences and
interconnections, preference shall be given to
390
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone /
Target Name
Qualitative
indicators (for
milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
aggregate procurement methods
M6C1-11
Investment 1.3:
Strengthening
Intermediate
Healthcare and its
facilities
(Community
Hospitals)
Target
Community
Hospitals’
services are
activated
N/A Number 0 307 Q2 2026
Independent expert reports confirming the
activation of services according to the
standards defined by Annex 1 Section 11 of
DM 23 May 2022 n.77 in at least 307
Community Hospitals.
391
P. MISSION 6 COMPONENT 2: Innovation, research and digitalisation of national
healthcare service
This component of the Italian recovery and resilience plan aims at ensuring the necessary enabling
conditions for greater resilience of the national healthcare service through: (i) replacement of obsolete
healthcare technologies in hospitals; (ii) the development of a significant structural improvement in the
safety of hospital buildings; (iii) the improvement of the health information systems and digital tools; (iv) the
promotion and strengthening of the scientific research sector; (v) the enhancement of human resources.
The investments and reforms under this component shall contribute addressing the country-specific
recommendations addressed to Italy in 2020 and 2019 on the need to “strengthen the resilience and capacity
of the health system in the areas of health workers, critical medical products and infrastructure” (country-
specific recommendation 1, 2020), to “focus investment on the green and digital transition, in particular on
[…] reinforced digital infrastructure to ensure the provision of essential services” (country-specific
recommendation 3, 2020), and to “focus investment-related economic policy on research and innovation, and
the quality of infrastructure, considering also regional disparities” (country-specific recommendation 3,
2019).
P.1. Description of the reforms and investments for non-repayable financial support
Reform 1: Revise and update the current legal framework of the Scientific Institutes for
Hospitalisation and Care (IRCCS)
The reform aims to reorganize the network of Scientific Institutes for Hospitalisation and Care (IRCCS) to (i)
improve the quality of the national health system (NHS), (ii) improving the relationship between Health and
Research and (iii) revisiting the legal regime of the IRCCS and the research policies within the competence
of the Italian Ministry of Health.
The reform shall improve the governance of the public IRCCSs by (i) enhancing the strategic management,
(ii) better defining the powers and areas of competence and (iii) comprehensively define the rules on the
status of the Scientific Director of the public IRCCSs and of research staff.
Lastly, a specific sub-measure differentiating IRCCSs on the basis of their activity (single-specialist or
generalist), creating an integrated network of IRCCSs and facilitating the exchange of expertise between the
IRCCSs themselves and the other structures of the Italian NHS.
Investment 2.1: Strengthening and enhancement of the NHS biomedical research
The objective of the measure is to increase the financing of the biomedical research system.
The investment consists in financing of Proof of Concept (PoC) projects, as well as the funding of research
initiatives in the field of rare diseases, rare cancers and other diseases with a high impact on health.
Investment 2.2: Development of technical-professional, digital and managerial skills of professionals in
the healthcare system
This measure has the objective of boosting the investment in training and skills related to the healthcare
system. This investment consists in increasing scholarships for the specific course in general medicine;
increasing the number of awarded medical specialist training contracts; trainings on managerial or digital
skills for employees of the NHS as well as trainings on safety in terms of hospital infections for employees
of the NHS.
392
P.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Sequential
Number
Related Measure
(Reform or Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and
target
Unit of
measure Baseline Goal Quarter Year
M6C2-1
Reform 1: Revise and
update the current legal
framework of the
Scientific Institutes for
Hospitalisation and Care
(IRCCS) and research
policies of the Ministry of
Health to strengthen the
link between research,
innovation and healthcare
Milestone
Entry into force of the
legislative decree
envisaging the
reorganisation of the
regulations governing
the Scientific institutes
for hospitalisation and
care (IRCSS)
Provision in the
decree indicating
the entry into force
N/A N/A N/A Q4 2022
The reform shall reorganize the
network of IRCCS to improve NHS
quality and excellence, improving the
relationship between Health and
Research, revisiting the legal regime
of the IRCCS and the research
policies within the competence of the
Italian Ministry of Health
The reform includes measures to: i)
strengthen the link between research,
innovation and healthcare; ii) improve
the governance of the public IRCCSs
by enhancing the strategic
management and better defining the
powers and areas of competence.
M6C2-2
Investment 2.1:
Strengthening and
enhancement of the NHS
biomedical research
Target
Research projects
funded on PoC (Proof of
Concept) and rare
cancers and diseases
N/A Number 0 200 Q2 2025
Award of funding to research projects
in the field of rare diseases and rare
cancers and Proof of Concept (PoC). Granting of funding for research
projects PoC and on rare diseases
and rare cancers shall be undertaken
through a public tender procedure.
At least 200 research projects shall
have received a first tranche of
393
Sequential
Number
Related Measure
(Reform or Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and
target
Unit of
measure Baseline Goal Quarter Year
financing.
M6C2-3
Investment 2.1:
Strengthening and
enhancement of the NHS
biomedical research
Target
Research projects
funded on diseases with
a high impact on health
N/A Number 0 324 Q2 2025
Award of funding to research projects
in diseases with a high impact on
health. Granting of funding for research
projects on diseases with a high
impact on health shall be undertaken
through a public tender procedure.
At least 324 research projects shall
have received a first tranche of
financing.
M6C2-16
Investment 2.2:
Development of technical-
professional, digital and
managerial skills of
professionals in the
healthcare system
Target
Trainings on managerial
and digital skills as well
as trainings on safety in
terms of hospital
infections for employees
of the National Health
Service
N/A Number 0 4 500 Q2 2026
Certificates of attendance in training
courses on managerial or digital skills
for 4 500 employees of the National
Health Service.
Publication of a list of at least 290 000
employees of the National Health
Service that have been enrolled for
trainings on safety in terms of hospital
infections.
M6C2-17
Investment 2.2:
Development of technical-
professional, digital and
managerial skills of
professionals in the
Target
Award of medical
specialist training
contracts
N/A Number 0 4 200 Q4 2025 Award of 4 200 medical specialist
training contracts.
394
Sequential
Number
Related Measure
(Reform or Investment)
Milestone /
Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and
target
Unit of
measure Baseline Goal Quarter Year
healthcare system
395
P.3. Description of the reforms and investments for the loan
Investment 1.1: Digital update of hospitals’ technological equipment
The objective of the measure is to enhance health staff productivity, improve the quality of processes,
ensuring patient safety and high-quality service delivery.
The investment consists in the modernisation of healthcare equipment, the informatisation of the processes of
hospitals with a first and second level Emergency Department (“Dipartimenti Emergenza e Accettazione”,
DEA), and the provision or conversion of beds in intensive care units and semi-intensive care in National
Health Service hospitals.
Investment 1.2: Toward a safe and sustainable hospital
The objective of this measure is to increase hospital safety or modernization of healthcare facilities. The
measure consists in anti-seismic interventions or interventions under Article 20 of Law 67/88 in healthcare
facilities.
Investment 1.3: Strengthening of the technological infrastructure and of the tools for data collection,
data processing, data analysis and simulation
The objective of this measure is to enhance care delivery, healthcare analytics and predictive capacity of the
Italian NHS. The investment consists in increasing the usage of the existing Electronic Health Records
(EHR) and reinforcing the technological and analytics infrastructure of the Ministry of Health.
Investment 2.2: Development of technical-professional, digital and managerial skills of professionals in
the healthcare system
This measure has the objective of boosting the investment in training and skills related to the healthcare
system. This investment consists in increasing scholarships for the specific course in general medicine;
increasing the number of awarded medical specialist training contracts; trainings on managerial or digital
skills for employees of the NHS as well as trainings on safety in terms of hospital infections for employees
of the NHS.
396
P.4. Milestones, targets, indicators, and timetable for monitoring and implementation for the loan
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/ Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
M6C2-4
Investment 1.1:
Digital update of
hospitals’
technological
equipment
Milestone
Reorganization
plan approved by
Ministry of
Health/Italian
Regions
Notification of the
approval N/A N/A N/A Q4 2021
Approval of the reorganization plan to
strengthen the capacity of the NHS hospitals
to adequately address pandemic
emergencies by increasing the number of
beds in intensive and sub-intensive care
units.
The hospital reorganization plan shall
increase the number of beds available in the
intensive and semi-intensive care units in
NHS hospitals.
M6C2-5
Investment 1.1:
Digital update of
hospitals’
technological
equipment
Milestone
Approval of the
Institutional
Development
Contract
Notification of the
signature of the
Institutional
Development
Contract by Ministry
of Health and Italian
Regions
N/A N/A N/A Q2 2022
Approval of an Institutional Development
Contract (Contratto Istituzionale di
Sviluppo), with the Italian Ministry of Health
as the responsible and implementing
Authority and the participation of regional
Administrations and other key stakeholders.
The Institutional Development Contract is
the tool identified by current national
legislation (combined provisions of art. 1 and
art. 6 of Legislative Decree no. 88 of May
31, 2011, and art. 7 of Legislative Decree
no. 91 of June 20, 2017, by Law no. 123 of
August 3, 2017) to accelerate the
implementation of strategic projects,
397
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/ Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
functionally connected to each other. The
Institutional Development Contract shall list
all the suitable sites identified for the
iinvestments, as well as the obligations that
each region shall assume to guarantee the
achievement of the expected result. In case
of breach by any region the Ministry of
Health shall proceed to the commissioner
“ad acta”.
M6C2-6
Investment 1.1:
Digital update of
hospitals’
technological
equipment
Target
Proof of delivery or
testing for 3 100
items of diagnostic
equipment
N/A Number 0 3 100 Q2 2026
Proof of delivery or testing (which may
include, but are not limited to, Verbale di
Collaudo, Test Certificates, and
Authorisation for use certificates) for 3 100
items of diagnostic equipment. At least 290
items shall be from the following categories:
NMR - nuclear magnetic resonance - at 1.5
T or more or linear Accelerators or PET/CT -
positron emission tomography/computer
tomography.
The remaining items of diagnostic
equipment may include, but are not limited
to, ultrasound, mammography, and CT –
Computer tomography.
M6C2-7 Investment 1.1:
Digital update of
hospitals’
Milestone Award of all public
contracts Notification of all
awarded public N/A N/A N/A Q4 2022
Publication of tendering procedures (Consip
framework agreement) and conclusion of
contracts with service providers and
398
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/ Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
technological
equipment
contracts. digitisation of hospitals classed as DEA I
and II level)
Contracts shall include the purchase of: a)
Data Processing Centre (DPC), including
ICT and any ancillary works, necessary to
achieve the computerization of the entire
hospital structure b) acquisition of hardware
and / or software information technology,
electromedical technologies, as well as
additional technologies and any ancillary
works, necessary to achieve
computerization of hospital departments.
The assessment of the current digitizing
level, preliminary to the implementation of
the intervention, shall allow to fine-tune this
evaluation, according to the real needs of
each region/hospital.
M6C2-8
Investment 1.1:
Digital update of
hospitals’
technological
equipment
Target
Hospitals are
digitized (DEA -
Emergency and
Admission
Departments -
Level I and
Level II)
N/A Number 0 280 Q4 2025
The target shall be achieved when the
digitization of the 280 first- and second-level
Emergency and Acceptance Department
(DEA) has been elevated by at least one
stage, according to the Electronic Medical
Record Adoption Model (EMRAM) as
attested by a digital maturity certificate from
the Healthcare Information and
Management Systems Society (HIMSS),
reaching stage two or more of the maturity
399
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/ Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
scale for at least 50 DEAs.
For the purpose of achieving this target,
procurements other than those made under
the contracts concluded for achieving M6C2-
7 may be taken into account, as well as
purchases made on the Electronic Market of
Public Administration (Mepa) or Public
Administration Dynamic Acquisition System
(SDAPA).
M6C2-9
Investment 1.1:
Digital update of
hospitals’
technological
equipment
Target
Beds provided or
converted in ICUs
and semi-intensive
care
N/A Number 0 5 922 Q2 2026
Administrative certificates attesting
completion of interventions to ensure the
provision or conversion of at least 5 922
beds in intensive care units and in semi
intensive care. The number of intensive care
beds shall be at least 2368.
M6C2-10
Investment 1.2:
Toward a safe and
sustainable
hospital
Target
Anti-seismic
interventions in
hospitals facilities
are completed
N/A Number 0 84 Q2 2026
Report on completed structure or Static test
certificate issued for at least 84 anti-seismic
interventions in hospitals facilities.
M6C2-10bis
Investment 1.2:
Toward a safe and
sustainable
hospital
Target
Payment(s) for
interventions under
Art. 20 of Law
67/88
N/A Number 0 225 000 000 Q2 2026 Proof of payment(s) of EUR 225 000 000 for
f interventions under Article 20 of Law 67/88.
400
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/ Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
M6C2-11
Investment 1.3:
Strengthening of
the technological
infrastructure and
of the tools for
data collection,
data processing,
data analysis and
simulation
Target
General
practitioners
feeding the
Electronic Health
Record.
N/A Percentage 0 85 Q4 2025
General Practitioners (MMG/PLS) using the
Electronic Health Record reaching (EHR) at
least 85% of the total. The target is achieved
through the verification on the EHR
monitoring dashboard of the value at
national level of indicator 2 referred to in
Annex 2 of the Decree of August 8, 2022,
and amendments.
M6C2-12
Investment 1.3:
Strengthening of
the technological
infrastructure and
of the tools for
data collection,
data processing,
data analysis and
simulation
Milestone
Testing of the
components of the
Health Insurance
card system, of the
infrastructure for
the interoperability
of the Electronic
Health Record, and
of the “Ecosistema
Dati Sanitari”
Administrative
certificates
confirming the
testing of the
components of the
Health Insurance
card system, of the
infrastructure for the
interoperability of
the EHR, and of the
“Ecosistema Dati
Sanitari”.
N/A N/A N/A Q2 2026
Administrative certificates confirming the
testing of:
i) the components of the Health
Insurance card system, including
the reengineering of the electronic
medical prescription process;
ii) the components of the
Infrastructure for the
interoperability of the Electronic
Health Record, including the
national registry of patients
dashboard, the EHR dashboard
(for subsidiary regions); and
iii) the components of the
“Ecosistema Dati Sanitari” (EDS),
including the data module, the
EDS broker, and the Gateway.
401
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/ Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
M6C2-13
Investment 1.3:
Strengthening of
the technological
infrastructure and
of the tools for
data collection,
data processing,
data analysis and
simulation
Target
The Electronic
Health Record is
being used for the
majority of health
records
N/A Percentage 0 90 Q2 2026
The production of native EHR documents
out of total documents shall reach 90%. The
target is achieved through the verification on
the EHR monitoring dashboard, of the value,
at national level, of indicator 1 referred to in
Annex 2 of the Decree of August 8, 2022,
and amendments, at least with respect to
the following documents: Hospital discharge
letter; emergency room report; laboratory
report; radiology report; pathological
anatomy report.
M6C2-14
Investment 2.2:
Development of
technical-
professional,
digital and
managerial skills
of professionals in
the healthcare
system
Target
Scholarships for
specific training in
general medical
practice are
awarded.
N/A Number 0 1 800 Q2 2023
This investment shall increase scholarships
for the specific course in general medicine,
guaranteeing the completion of 3 three-year
training cycles.
M6C2-15
Investment 2.2:
Development of
technical-
professional,
digital and
managerial skills
Target
Additional
scholarships for
specific training in
general medical
practice are
N/A Number 1 800 2 700 Q2 2024
This investment shall increase scholarships
for the specific course in general medicine,
guaranteeing the completion of 3 three-year
training cycles.
402
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/ Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative timeline
for completion
Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
of professionals in
the healthcare
system
awarded.
403
Q.MISSION 7: REPowerEU
The REPowerEU chapter aims at strengthening distribution transmission and distribution networks,
including those related to gas; accelerating renewable energy production, reducing energy demand,
increasing energy efficiency and creating the skills in the public and private sectors for the green
transition; promoting renewable energy and hydrogen value chains through measures facilitating
access to credit and tax credits.
The component addresses the country-specific recommendations addressed to Italy in 2022 and 2023.
Notably, it aims to accelerate the deployment of additional renewable energy capacity by investing in
major electricity interconnections projects (namely, two interconnectors connecting Sardinia and
Sicily to the mainland), upgrading the national transmission grid and streamlining permitting
procedures. It contributes to increasing the capacity for internal gas transmission to overcome
bottlenecks, diversify energy imports and strengthen the security of supply. It promotes sustainable
mobility by reducing environmentally harmful subsidies and strengthening the railway fleet. It helps
reducing the reliance on fossil fuels by electrifying the consumption of households and increasing the
resilience of the network. It contributes to increasing energy efficiency in the residential and corporate
sectors, including through targeted incentive schemes and financial instruments. Finally, it includes
reforms and investments to improve the provision and acquisition of the skills needed for the green
transition – both in the private and in the public sectors.
Nine projects have a cross-border dimension. Two of them have a direct cross-border impact: 1) an
investment contributing to the construction of an electric interconnection between Sardinia, Corsica
and Tuscany; 2) an investment in a compressor station that shall increase gas export towards Central
Europe. Other projects indirectly benefit cross-border Member states by addressing internal energy
transmission and distribution bottlenecks and increasing the efficiency and resilience of the grid.
It is expected that no measure in this component does significant harm to environmental objectives
within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description of
the measures and the mitigating steps set out in the recovery and resilience plan in accordance with
the ‘Do no significant harm’ Technical Guidance (C(2023) 6454 final), whereas the principle of “do
no significant harm” does not apply to investment 13 - Adriatic Line Phase 1 (Sulmona compressor
station and Sestino-Minerbio gas pipeline) and investment 14 - Cross-border gas export infrastructure,
in accordance with Article 21c(6) pf Regulation (EU) 2021/241.
Q.1. Description of the reforms and investments for non-repayable financial support
Reform 1. Streamlining permitting procedures for renewable energy at central and local level
The objective of this reform is to consolidate and streamline the existing legislation and provisions
regulating the permitting of renewable energy sources. The reform consists in the adoption and entry
into force of a legal act (also known as Testo Unico) collecting, compiling, and consolidating the
norms regulating the permitting of renewables, and superseding past legislation on that matter. The
reform also aims to set out the legal framework for the identification of “renewable acceleration
areas’’ and to establish a digital platform enabling the submission and/or the collection – when
introduced via other platforms – of authorization requests at national and sub-national level to install
renewable energy plants as well as the submission of the communication on plants installed under
Edilizia Libera.
Reform 2. Reduction of Environmental Harmful Subsidies
The objective of this reform is to lead to a reduction of Environmentally Harmful Subsidies, based on
the 2022 Catalogue of Environmentally Harmful Subsidies published by MASE. The reform consists
in the adoption of a stakeholders consultation report and of legal acts.
404
Reform 3. Reduction of the costs of connection to the gas network of biomethane
The reform aims to facilitate the inclusion of biomethane into the energy system and energy market
and to create new sustainable biomethane production capacity in line with Directive (EU) 2018/2001
(Renewable Directive) and its delegated acts, and in particular to favour the flexibility and efficiency
of the natural gas network by facilitating a conversion to biomethane. The reform consists in the entry
into force of legal acts to reduce the connection costs of sustainable biomethane production plants,
and encourage investments targeting the uptake of sustainable biomethane in natural gas networks.
Reform 4. Mitigation of financial risk associated with renewable PPAs (Power Purchase
Agreements)
The objective of the reform is to establish a system of guarantees mitigating the financial risk
associated with renewable Power Purchase Agreements with a duration of at least three years.
The reform shall:
i) require for each operator to guarantee partial coverage of the countervalue of the Power
Purchase Agreements by means of guarantee instruments provided on the electricity
market;
ii) introduce measures to mitigate the risk of default, including requirements and constraints
on the bidder and regulatory sanctions in the event of the producer’s default;
iii) identify an institutional entity to take on the role of seller/buyer of last resort, who would
take over from the failing counterpart and ensure the fulfilment of the obligations
assumed vis-à-vis the performing counterpart.
Reform 5. Plan for new Skills – Transitions
The objective of the reform is to better align training programmes to labour market needs to combat
skills mismatch, with specific attention to green and digital skills. This reform consists in the adoption
and entry into force of legal acts at national level updating the New Skills Plan (“Piano Nuove
Competenze – Transizioni”) and regional legal acts.
Investment 1. Scale-up measure: Smart grids
The objective of this investment is to digitalise the electricity distribution grid as a scale up of
Investment 2.1 (Strengthening smart grids) in Mission 2 Component 2. The investment consists in
providing grants to grid operators to finance interventions corresponding to an increased maximum
power delivered for consumption by the grid for more inhabitants than what is already envisaged by
the M2C2 measure.
Investment 2. Scale-up measure: Interventions to increase the resilience of power grid
The objective of this investment is to increase the resilience of the transmission and distribution grid
to extreme weather events as a scale up of Investment 2.2 in Mission 2 Component 2. The investment
consists in providing grants to grid operators for interventions corresponding to increased resilience of
the grid on top of what is already envisaged by the M2C2 measure.
Investment 3. Scale-up measure: Production of Hydrogen in brownfield sites (Hydrogen Valleys)
The objective of this investment is to create new hydrogen valleys, that is local production and use of
renewable hydrogen in industry, SMEs, and local transport in abandoned industrial areas, as a scale-
up of Investment 3.1 in Mission 2 Component 2. The scale-up investment consists in carrying out 2
additional projects to create hydrogen valleys compared to those envisaged by Investment 3.1 in
Mission 2 Component 2.
Investment 4. Tyrrhenian link
The objective of this investment is to increase the integration of the South of Italy in the national
transmission grid. This investment consists in the construction of the “East interconnection line” of
405
the Tyrrhenian link between Sicily and Campania, particularly the installation of the point-to-point
direct current (HVDC) cable(s).
Investment 5. SA.CO.I.3
The objective of this investment is to modernise the electricity transmission infrastructure connecting
Sardinia to the rest of Italy, via Corsica, and to increase its integration into the national transmission
grid. This investment consists in the construction of the shells (external infrastructure) of the
conversion stations in Codrongianos and Suvereto for the “Sardinian-Corsica-Italy 3” interconnection
project.
Investment 7. Smart National Transmission Grid
The objective of this investment is to digitalise the national transmission grid and improve the
management and control system operated by the transmission system operator. The investment
consists in the installation of secure protocol 104 and 5G equipment or ICT architecture in electrical
stations, as well as of monitoring systems on electricity pylons.
Investment 8. Sustainable, circular and secure supply of Critical Raw Materials
The objective of this investment is to support the recovery and recycling of critical raw materials
(CRM), and thereby the value chains in CRM and technologies linked to the green transition. The
investment consists in analysing future CRM needs and the potential of eco-design to reduce their
demand as well as in supporting the creation of a geographic information system platform for
identifying recyclable materials in urban environments and waste in abandoned or closed mines. It
also consists in equipping laboratories to create a single hub for Urban Mining and Eco-design.
Investment 10. Pilot project on skills “Crescere Green”
The objective of this investment is to foster green skills with the involvement of the private sector.
The measure consists in delivering short training interventions focusing on green skills.
Investment 11. Strengthening of the regional public transport railway fleet with zero emission
trains and universal service
The objective of the investment is to reduce greenhouse gases emissions of railway transport and
modernise the railway fleet. This investment consists in the procurement of at least 79 zero emission
passengers’ trains.
Investment 18 – Scale-up measure: Private and light commercial vehicle fleet renewal program
with electric vehicles
This investment aims at reducing greenhouse gases and air pollution caused by road transport in urban
areas. This investment consists in purchasing zero-emission vehicles and scrapping thermal vehicles.
406
Q.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/ Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
M7-1
Reform 1:
Streamlining
permitting procedures
for renewable energy
Milestone
Legal framework
for the
identification of
“renewable
acceleration
areas”
Provision in the
law indicating the
entry into force of
the legal
framework for the
identification of
renewable
acceleration areas
Q4 2024
Entry into force of primary legislation setting
out the legal framework for the identification of
“renewable acceleration areas”.
The legal framework shall:
1) require the mapping of renewable
energy potential across the country;
2) based on the mapping, establish a
first set of areas, setting a minimum set for the
future identification of renewable acceleration
areas;
3) based on the minimum set of areas,
require regions and autonomous provinces to
identify renewable acceleration areas by 21
February 2026;
4) entitle the central government to
exert substitutive powers in case regions or
autonomous provinces fail to identify
renewable acceleration areas by 21 February
2026;
5) require the identification of off-shore
areas for renewables deployment in
coherence with maritime spatial plans.
M7-2 Reform 1:
Streamlining Milestone Entry into force
of the legal act
Provision in the
law indicating the Q2 2025 Entry into force of a legal act (Testo Unico)
collecting, compiling and consolidating the
407
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/ Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
permitting procedures
for renewable energy
(Testo Unico) entry into force of
the legal act
norms regulating the permitting of renewables,
and superseding past legislation on that
matter.
The Testo Unico shall also set out “ceiling
rules” on permitting such that regions cannot
implement stricter rules than those set out in
national legislation.
M7-3
Reform 1:
Streamlining
permitting procedures
for renewable energy
Milestone
Establishment of
the digital
platform for
authorizations
related to
renewables
Establishment of
the digital platform
for authorization
related to
renewables
Q2 2026
The digital platform is online and shall enable
the submission and/or the collection – when
introduced via other platforms - of
authorization requests related to the
installation of renewable energy plants at
national and sub-national level
(Autorizzazione Unica, Procedura Abilitativa
Semplificata) as well as the submission of the
communication on plants installed under
Edilizia Libera.
M7-4
Reform 2: Reduction
of Environmental
Harmful Subsidies
Milestone
Adoption of a
government
report,
presenting the
outcome of a
government
consultation with
stakeholders to
reduce
environmentally
harmful
Adoption of
government report Q4 2024
A report shall outline the actions taken to
consult relevant stakeholders on the reform of
environmentally harmful subsidies, including
the input received by stakeholders. Consulted
stakeholders shall include relevant public
bodies and private stakeholders.
408
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/ Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
subsidies.
M7-5
Reform 2: Reduction
of Environmental
Harmful Subsidies
Milestone Entry into force
of legal act(s)
Provision in the
law indicating the
entry into force of
the legal act(s)
Q4 2025
Entry into force of legal acts providing for the
reduction of environmentally harmful subsidies
of at least EUR 4.5 billion in 2026.
M7-6
Reform 3: Reduction
of the costs of
connection to the gas
network of biomethane
Milestone
Entry into force
of legal acts to
reduce the costs
of connection to
the gas network
of biomethane
production
plants
Provision in the
law indicating the
entry into force of
legal acts
Q3 2025
The legal acts shall:
• Reduce the costs of connection to the gas network of biomethane production plants for the producer.
• Provide regulatory incentives to invest in the gas network to increase the integration of renewable gases.
• Facilitate the integration between transmission and distribution network, also through mechanisms for sharing the costs of investments in grid connection.
M7-7
Reform 4: Mitigation of
financial risk
associated with
renewable PPAs
(Power Purchase
Agreements)
Milestone
Entry into force
of primary and
secondary
legislation
Provision in the
law indicating the
entry into force of
the law
Q4 2024
Entry into force of primary and secondary
legislation.
The primary legislation shall provide for the adoption of secondary legislation implementing the requisites i), ii) and iii) below.
The secondary legislation shall:
I) require for each operator to guarantee partial coverage of the countervalue of the Power Purchase Agreements by means of guarantee
409
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/ Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
instruments provided on the electricity market;
II) introduce measures to mitigate the risk of default, including requirements and constraints on the bidder and regulatory sanctions in the event of producer’s default;
III) identify an institutional entity to take on the role of seller/buyer of last resort, who would take over from the failing counterpart and ensure the fulfilment of the obligations assumed vis-à-vis the performing counterpart.
M7-9 Reform 5: Plan for
new Skills - Transitions Milestone
Adoption and
publication of the
New Skills Plan
– Transitions
and of the Road
Map for
implementation
Adoption of the
plan and roadmap Q1 2024
The “Piano Nuove Competenze” adopted by Decree of 14 December 2021and published in Gazzetta ufficiale n.307 of 28 December 2021 is amended and the new Transitions skills plan enters into force. The plan includes the general principles to be further specified by regional laws, which shall include:
i) greater involvement of the private sector in training provision,
ii) improved recognition of on-the-job training and micro-credentials,
iii) greater ex-ante labour market analysis and monitoring of occupational effects of training.
An implementation roadmap is also adopted.
M7-10 Reform 5: Plan for Milestone Entry into force Provision(s) in Q3 2025 Entry into force of legal act(s) including
410
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/ Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
new Skills - Transitions of legal act(s) for
regions and
autonomous
province(s)
legal acts provisions to:
i. ensure that the planning of training activities: a) Involves private sector stakeholders,
and/or b) is based on the use of skills
intelligence tools to respond to the medium and long-term skills needs, and/or
c) has a focus on the skills needed for the green and digital transitions;
and/or
ii. Validate training and their outcomes through the release of certificates, according to common minimum standards, for:
a) in-company training, and/or b) micro-credentials.
The legal acts shall enter into force for all the Italian Regions and Autonomous Province(s), excluding Bolzano and Valle d’Aosta.
M7-11
Investment 1: Scale-
up measure: Smart
grids
Milestone
Increase in
maximum power
delivered for
consumption by
the grid
Interventions
carried out N/A N/A N/A Q2 2026
Independent engineer report(s) certifying that interventions have been carried out resulting in an increase in the maximum power delivered for consumption by the grid for a number of Points Of Delivery corresponding to at least 230 000 inhabitants on top of the 1 500 000 inhabitants under M2C2-10.
411
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/ Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
M7-12
Investment 2: Scale-
up measure:
Interventions to
increase the resilience
of power grid
Milestone
Increase the
resilience of the
electric grid
Interventions
carried out N/A N/A N/A Q2 2026
Independent engineer report(s) certifying that interventions have been carried out corresponding to an increase in resilience of at least 648 km of electric grid on top of the 4 000 km under M2C2-13).
M7-13
Investment 3: Scale-
up measure:
Production of
Hydrogen in
brownfield sites
(Hydrogen Valleys)
Target Electrolysers
installed Number 10 12 Q2 2026
Installation of 12 electrolysers of a capacity of
at least 1 MW each within 12 hydrogen valley
projects.
Connection cost estimates accepted or paid
by the developer are issued for the
electrolysers requiring grid connection.
M7-14 Investment 4:
Tyrrhenian link Milestone
Award of
contracts
Notification of the
award of contracts Q3 2024
Notification of the award of all the contracts for
the works necessary for the laying of 511 km
of cables connecting Caracoli to Eboli.
M7-15 Investment 4:
Tyrrhenian link Milestone
Cable(s) laid
down Works carried out N/A N/A N/A Q2 2026
Works for laying down the East link Pole 1
cable(s) connecting Sicily to Campania and
ensuring a nominal capacity of 500 MW have
been carried out.
M7-16 Investment 5:
SA.CO.I.3 Milestone
Award of
contracts Award of contracts Q4 2024
Award of all the contracts for the works
necessary for the completion of shells of the
conversion stations of Sardinia and Tuscany.
M7-17 Investment 5:
SA.CO.I.3 Milestone
Construction of
the shells of the
conversion
stations in
Sardinia
Works carried out N/A N/A N/A Q2 2026
Works for the construction of the shells of the
conversion stations of Sardinia
(Codrongianos) and Tuscany (Suvereto) have
been carried out.
412
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/ Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
(Codrongianos)
and Tuscany
(Suvereto)
M7-22
Investment 7: Smart
National Transmission
Grid
Milestone
Installation of 5G
equipment,
information
communication
technology
architecture,
secure protocol
104 in electric
stations and
monitoring
systems in
electricity pylons
Interventions
carried out N/A N/A N/A Q2 2026
Independent engineer report(s) certifying that
interventions have been carried out resulting
in the installation of:
-5G equipment or information communication
technology architecture in at least 40 stations.
-Secure protocol 104 (International Electrotechnical Commission 62 351 protocol) in at least 250 electric stations.
- Monitoring systems in at least 1 500
electricity pylons.
M7-25
Investment 8:
Sustainable, circular
and secure supply of
Critical Raw Materials
Milestone Publication of
the report on the
future needs for
CRM and the
potential of eco-
design
Publication of the
report N/A N/A N/A Q2 2025
Publication of a report analysing the future
needs for critical raw materials and the
potential of eco-design to reduce the demand
for critical raw materials.
M7-26
Investment 8:
Sustainable, circular
and secure supply of
Critical Raw Materials
Milestone Geographical
Information
system platform
available online
Geographic
information system
platform available
online
N/A N/A N/A Q4 2025
A geographic information system platform is
available online, identifying recyclable
materials in urban environments and waste in
abandoned or closed mines.
M7-27 Investment 8:
Sustainable, circular Milestone Equipment of
laboratories on
Equipment of at
least 6 laboratories N/A N/A N/A Q2 2026 Delivery and acceptance reports for the
equipment of at least 6 laboratories of the
413
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/ Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
and secure supply of
Critical Raw Materials
Urban mining
and eco-design
of the
technological hub
for urban mining
and eco-design
delivered
Technological hub for Urban Mining and Eco- design.
M7-30
Investment 10: Pilot
project on skills
“Crescere Green”
Target Training
certificates Number 0 20 000 Q4 2025
Training certificates issued for at least 20 000
beneficiaries of the pilot project. The pilot
project shall cover at least two regions, and it
shall concern green skills, as defined by the
ESCO database.
M7-31
Investment 11:
Strengthening of the
regional public
transport railway fleet
with zero emission
trains and universal
service
Target Number of trains
procured N/A Number 0 79 Q2 2026
Registration or confirmation of acceptance
accompanied by the Declaration of Conformity
of at least 79 zero-emission (electric or
hydrogen fuel cell) trains on top of the rolling
stock referred to under Investment 4.4.2 of
Mission 2 Component 2
M7-32
Investment 12
Financial Instrument
for the development of
an international,
industrial and R&D
leadership in zero-
emission buses
Milestone Implementing
Agreement
Entry into force of
the Implementing
Agreement
Q1 2024 Entry into force of the Implementing
Agreement.
M7-50 Investment 18 - Scale-
up measure: Private
and light commercial
Target
Number of
vehicles
purchased
N/A Number 30 830 46 500 Q2 2026
Signature of contracts for purchase of at least
46 500 zero-emission vehicles.
For each vehicle purchased, a scrapping
414
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/ Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and target
Unit of
measure Baseline Goal Quarter Year
vehicle fleet renewal
program with electric
vehicles
certificate demonstrating the scrapping of a thermal vehicle shall also be provided.
415
Q.3. Description of the reforms and investments for the loan
Investment 13. Adriatic Line Phase 1 (Sulmona compressor station and Sestino-Minerbio gas pipeline)
The objective of this investment is to increase and diversify security of supply for gas, including liquefied
natural gas. The measure consists in the construction of a compressor station in Sulmona and a gas pipeline
connecting the nodes of Sestino and Minerbio, as part of the Adriatic Line.
Investment 14. Cross-border gas export infrastructure
The objective of this investment is to increase and diversify security of supply for gas, including liquified
natural gas. This investment consists in upgrading the existing gas infrastructure allowing for the export of
natural gas via the Tarvisio exit point, in particular through the construction of a new electric compression
unit in the Poggio Renatico compressor station.
Investment 15. Transizione 5.0
The objective of this investment is to support the transition towards energy efficient, sustainable and
renewable-based production models for firms. The investment consists in granting a tax credit to firms
commensurate with eligible expenses incurred between 1 January 2024 and 31 December 2025, and namely
digital assets (4.0 tangible capital goods, 4.0 intangible capital goods92), assets necessary for self-production
and self-consumption from renewable sources (with the exclusion of biomass), and training staff in skills for
the green transition. The investment also consists in setting-up an IT support platform and related activities
for management, monitoring, and control purposes provided by GSE – Gestore Servizi Energetici.
Investment 16. Support to SMEs for self-production from renewable energy sources
This measure shall consist of a public investment in a Grant Scheme the “Support to SMEs for self-
production from renewable energy sources” in order to incentivise private investment and improve access to
finance in Italy’s self-production of energy from renewable sources (RES).
The Scheme aims to support micro, small and medium-sized enterprises (SMEs) in the implementation of
investment programs aimed at the self-production of energy from renewable sources93.
The scheme shall operate by providing grants directly to the private sector.
The Scheme shall be managed by Invitalia SpA as the implementing partner. The Scheme shall include the
following product lines:
- non-repayable contributions amounting to at least 30% of the total investment - for the purchase of
systems and related digital technologies, which allow the direct production of energy from renewable
sources for immediate self-consumption or through accumulation/storage systems.
In order to implement the investment into the Scheme, Italy and Invitalia SpA shall sign an Implementing
Agreement that shall include the following content:
1. Description of the decision-making process of the Scheme: The final investment decision of the
Scheme shall be taken by an investment committee or other relevant equivalent governing body
and approved by a majority of votes from members who are independent from the government.
2. Key requirements of the associated investment policy,which shall include:
a) The description of the type of support provided and eligible final beneficiaries.
b) The requirement that all investments supported are economically viable.
a. The requirement to comply with the ‘Do no significant harm’ (DNSH) principle as set out in
the DNSH Technical Guidance (2021/C58/01). In particular, in the case of general support to
92 In particular, the scheme refers to annexes A and B of law 11 December 2016, n. 232. 93 Final beneficiaries associated to specific projects shall be required to provide a justification of the selected
intervention field for each project supported, together with a description of the project, for the purpose of the
computation of the climate contribution. The implementing partner shall also be required to provide to the Member
State a semi-annual report on the implementation of each project/activity.
416
corporates, the investment policy shall exclude companies with a substantial focus94 in the
following sectors: (i) fossil fuel-based energy production and related activities95; (ii) energy-
intensive and/or high CO2-emitting industries96; (iii) production, rental, or sale of polluting
vehicles97; (iv) waste collection, waste treatment and disposal98, (v) processing of nuclear
fuel, production of nuclear energy. Furthermore, the investment policy shall require
compliancewith the relevant EU and national environmental legislation of the final
beneficiaries of the Scheme.
c) The requirement that final beneficiaries of the Scheme shall not receive support from other
Union instruments to cover the same cost.
3. The amount covered by the Implementing Agreement, the fee structure for the Implementing
Partner and the requirement to invest any unused proceeds of the scheme, including beyond 2026,
for the same policy purposes.
4. Monitoring, audit, and control requirements, including:
i) The description of the implementing partner’s monitoring system to report on the investment
mobilized.
ii) The description of the implementing partner’s procedures that shall ensure the prevention,
detection and correction of fraud, corruption, and conflicts of interests.
iii) The obligation to verify the eligibility of every operation in accordance with the
requirements laid out in the Implementing Agreement before committing to finance an
operation.
iv) The obligation of carrying out risk-based ex-post audits in accordance with an audit plan of
Invitalia SpA. These audits shall verify i) that the control systems are effective, including the
detection of fraud, corruption, and conflict of interests; ii) compliance with the DNSH
principle, the State Aid rules, the climate target requirements; and iii) that the requirement
that final beneficiaries of the Scheme have not received support from other Union
instruments to cover the same cost is respected. The audits shall also verify the legality of
the transactions and that the conditions of the applicable Implementing Agreement are being
respected.
94 It is considered that a Final Beneficiary has a “substantial focus” on a sector or business activity if such sector or
activity is identified as being an essential part of the business activity of the Final Beneficiary respectively in relation to
the gross revenue, profit, or client base of the Final Beneficiary. The gross revenue generated from the restricted sector
or activity shall, in any case, not exceed 50% of the gross revenue. 95 Except for (a) assets and activities in power and/or heat generation, as well as related transmission and distribution
infrastructure, using natural gas, that are compliant with the conditions set out in Annex III of the ‘Do no significant
harm’ Technical Guidance (2021/C58/01) and (b) activities and assets under point (ii) for which the use of fossil fuels is
temporary and technically unavoidable for the timely transition towards a fossil fuel free operation. 96 Including activities and assets under the EU Emission Trading System (ETS) achieving projected greenhouse gas
emissions that are not lower than the relevant benchmarks. Where the activity supported achieves projected greenhouse
gas emissions that are not significantly lower than the relevant benchmarks, an explanation of the reasons why this is
not possible shall be provided. Benchmarks established for free allocation for activities falling within the scope of the
Emissions Trading System, as set out in the Commission Implementing Regulation (EU) 2021/447. 97 Polluting vehicles are defined as non-zero-emission vehicles. 98 This exclusion does not apply to actions in plants exclusively dedicated to treating non-recyclable hazardous waste,
and to existing plants, where the actions under this measure are for the purpose of increasing energy efficiency,
capturing exhaust gases for storage or use or recovering materials from incineration ashes, provided such actions under
this measure do not result in an increase of the plants’ waste processing capacity or in an extension of the lifetime of the
plants; for which evidence is provided at plant level.
417
Investment 17. Financial instrument for energy renovations of public residential housing
The objective of the measure is to support renovation of public residential housing. This measure shall
consist of a public investment in a Facility, the “Financial instrument to alleviate energy poverty”, in order to
incentivise private investment and improve access to finance. The instrument shall target energy renovations
in public residential housing achieving on average at least a 30% of primary energy demand reduction99.
The Facility shall be managed by two Implementing Partners.
• The Gestore Servizi Energetici (GSE Spa) as technical partner responsible for the grant component;
• Cassa Depositi e Prestiti (CDP Spa) as financial partner and responsible for the (optional) loan
component.
The facility shall provide financial support in the form of grants and/or loans for the energy renovation of
public residential housing, achieving on average at least a 30% of primary energy demand reduction.
The Facility shall include the following product lines to support public residential housing:
· A grant component provided by the technical partner Gestore Servizi Energetici Spa covering a
maximum of 65% of total costs;
· An optional loan component covering 35% of total costs. The loan component can be provided by
the financial partner Cassa Depositi e Prestiti
In order to implement the investment into the Facility, Italy and the Implementing Partner(s) shall sign
Implementing Agreement(s) that shall include the following content:
1. Description of the decision-making process of the Facility: The final investment decision of the
Facility shall be taken by an investment committee or other relevant equivalent governing body and
approved by a majority of votes from members who are independent from the government.
2. Key requirements of the associated investment policy,which shall include:
a. The description of the financial product(s) and eligible final beneficiaries.
b. The requirement that all investments supported are economically viable.
c. The requirement to comply with the ‘Do no significant harm’ (DNSH) principle as set out in
the DNSH Technical Guidance (2021/C58/01). In particular, the investment policy shall
exclude the following list of activities and assets from eligibility: (i) activities and assets
related to fossil fuels, including downstream use100, (ii) activities and assets under the EU
Emission Trading System (ETS) achieving projected greenhouse gas emissions that are not
lower than the relevant benchmarks101, (iii) activities and assets related to waste landfills,
incinerators102 and mechanical biological treatment plants103.
99 Final beneficiaries associated to specific projects shall be required to provide a justification of the selected
intervention field for each project supported, together with a description of the project, for the purpose of the
computation of the climate contribution. The implementing partner shall also be required to provide to the Member
State a semi-annual report on the implementation of each project/activity. 100 Except for (a) assets and activities in power and/or heat generation, as well as related transmission and distribution
infrastructure, using natural gas, that are compliant with the conditions set out in Annex III of the ‘Do no significant
harm’ Technical Guidance (2021/C58/01) and (b) activities and assets under point (ii) for which the use of fossil fuels is
temporary and technically unavoidable for the timely transition towards a fossil fuel free operation. 101 Where the activity supported achieves projected greenhouse gas emissions that are not significantly lower than the
relevant benchmarks, an explanation of the reasons why this is not possible shall be provided. Benchmarks established
for free allocation for activities falling within the scope of the Emissions Trading System, as set out in the Commission
Implementing Regulation (EU) 2021/447. 102 This exclusion does not apply to actions under this measure in plants exclusively dedicated to treating non-recyclable
hazardous waste, and to existing plants, where the actions under this measure are for the purpose of increasing energy
efficiency, capturing exhaust gases for storage or use or recovering materials from incineration ashes, provided such
418
d. The requirement that final beneficiaries of the Facility shall not receive support from other
Union instruments to cover the same cost. The financial support provided via the loan
component of the instrument shall not cover the same cost supported by the grant component
of this instrument.
3. The amount covered by the Implementing Agreement, the fee structure for the Implementing Partner
and the requirement to reinvest any reflows according to the investment policy of the Facility unless
they are used to service loan repayments of the Recovery and Resilience Facility.
4. Monitoring, audit, and control requirements, including:
a. The description of the implementing partner’s monitoring system to report on the investment
mobilized.
b. The description of the implementing partner’s procedures that shall ensure the prevention,
detection and correction of fraud, corruption, and conflicts of interests.
c. The obligation to verify the eligibility of every operation in accordance with the
requirements laid out in the Implementing Agreement before committing to finance an
operation.
d. The obligation of carrying out risk-based ex-post audits in accordance with an audit plan of
Gestore dei Servizi Energetici (GSE), and of Cassa Depositi e Prestiti (CDP) . These audits
shall verify i) that the control systems are effective, including the detection of fraud,
corruption, and conflict of interests; ii) compliance with the DNSH principle, the State Aid
rules, the climate target requirements; and iii) that the requirement that final beneficiaries of
the Facility have not received support from other Union instruments to cover the same cost
is respected. The audits shall also verify the legality of the transactions and that the
conditions of the applicable Implementing Agreement are being respected.
actions under this measure do not result in an increase of the plants’ waste processing capacity or in an extension of the
lifetime of the plants; for which evidence is provided at plant level. 103 This exclusion does not apply to actions under this measure in existing mechanical biological treatment plants, where
the actions under this measure are for the purpose of increasing energy efficiency or retrofitting to recycling operations
of separated waste to compost bio-waste and anaerobic digestion of bio-waste, provided such actions under this measure
do not result in an increase of the plants’ waste processing capacity or in an extension of the lifetime of the plants; for
which evidence is provided at plant level.
419
Q.4. Milestones, targets, indicators, and timetable for monitoring and implementation for the loan
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/ Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
M7-35
Investment 13:
Adriatic Line
Phase 1 (Sulmona
compressor station
and Sestino-
Minerbio gas
pipeline)
Milestone
Adoption and
update of
relevant
environmental
impact
assessments
(VIncA)
SSCOs identified
and VincA revised
and adopted
accordingly
Q1 2024
The Italian authorities shall:
• Establish the site-specific conservation objectives (SSCOs) for the Natura 2 000 sites affected by the project according to the methodology adopted by the Ministry of Environment and Energy Security in 2021 and 2023.
• Verify the appropriate assessments already carried out under the Habitats Directive (VINCAs) in the light of the newly established SSCOs.
• Update (if needed) of the appropriate assessments (VINCAs) already carried out under the Habitats Directive in line with the national guidelines of 28 December 2019 and ensure their integration into the overall environmental impact assessment procedure.
M7-36
Investment 13:
Adriatic Line
Phase 1 (Sulmona
compressor station
and Sestino-
Minerbio gas
Milestone Award of
contracts
Notification of the
award of contracts Q2 2024
Notification of the award of all contracts for
the works necessary for the construction of
the Sulmona compressor station and
Sestino-Minerbio gas pipeline.
420
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/ Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
pipeline)
M7-37
Investment 13:
Adriatic Line
Phase 1 (Sulmona
compressor station
and Sestino-
Minerbio gas
pipeline)
Milestone
Works on the
Sulmona
compression
station and
Sestino Minerbio
gas pipeline
carried out
Works carried out Q2 2026
Works on the Sulmona compressor station
and Sestino-Minerbio gas pipeline for an
increase in the technical capacity of gas
transport of 14 mcm/day have been carried
out.
M7-38
Investment 14:
Cross-border gas
export
infrastructure
Milestone Award of
contracts
Notification of the
award of contracts Q2 2024
Notification of the award of all the
contracts for the works necessary for the
completion of the Poggio Renatico
compressor station
M7-39
Investment 14:
Cross-border gas
export
infrastructure
Milestone
Works on the
Poggio Renatico
compression
station carried
out
Works carried out Q2 2026
Works on the compression unit in the
Poggio Renatico compressor station for an
increase in technical capacity of gas export
via the Tarvisio Exit Point by 8 bcm/y have
been carried out.
M7-40 Investment 15:
Transizione 5.0 Milestone
Entry into force
of the legal act
establishing the
criteria of eligible
interventions
Provision in the law
indicating the entry
into force of the law
Q1 2024
The legal act shall make Transition 5.0 tax
credits available to potential recipients,
determining the eligibility criteria, also in
terms of minimum energy savings, and the
maximum expenditure cap for the
measure.
421
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/ Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
M7-41 Investment 15:
Transizione 5.0 Target
Tax credits
granted to firms
based on
documents
presented in
2024-2025
N/A
Amount of
granted
resources
(EUR)
0 2 500 000 000 Q2 2026
Notification of the granting of all RRF
resources earmarked for this investment.
At least EUR 1 000 000 000 of the
investment shall contribute to the climate
change objectives in accordance with
Annex VI to the RRF Regulation.
Report by GSE (Gestore Servizi
Energetici) outilining the total energy
efficiency savings in final energy
consumptions generated in the period
2024-2026.
M7-43
Investment 16:
Support to SMEs
for self-production
from renewable
energy sources
Milestone Implementing
Agreement
Entry into force of
the Implementing
Agreement
Q4 2024 Entry into force of the Implementing
Agreement.
M7-44
Investment 16:
Support to SMEs
for self-production
from renewable
energy sources
Milestone
The Ministry of
Enterprises and
Made in Italy has
completed the
transfer of funds
to Invitalia
Certificate of transfer Q4 2024 Italy shall transfer EUR 186 651 988,92 to
Invitalia for the Facility.
M7-45 Investment 16:
Support to SMEs Target Legal
agreements with N/A Percentage(%) 0 100% Q2 2026 Invitalia S.p.A. shall have entered into
legal agreements with final beneficiaries
422
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/ Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
for self-production
from renewable
energy sources
final
beneficiaries
for an amount necessary to use 100% of
the RRF investment into the Scheme
(taking into account management fees).
M7-46
Investment 17:
Financial
instrument for
energy renovations
of public residential
housing
Milestone
Definition of the
target of the
terms of
reference
Entry into force of
the act with the
definition of the
terms of reference of
the financial
instrument
Q3 2024
Define the terms of reference of the
financial instrument, which shall target
energy renovations in public residential
housing.
M7-47
Investment 17:
Financial
instrument for
energy renovations
of public residential
housing
Milestone Implementing
Agreement
Entry into force of
the Implementing
Agreement
Q2 2025
Entry into force of the Implementing
Agreement(s) in line with the requirements
specified in the description of the measure.
In particular the Implementing
Agreement(s) shall include eligibility
criteria concerning the minimum energy
efficiency improvement that the instrument
shall achieve (on average at least 30% of
primary energy demand reduction).
The selection criteria shall also prioritize
interventions with highest returns in term of
energy efficiency.
M7-48
Investment 17:
Financial
instrument for
energy renovations
Milestone
Ministry has
completed the
investment
Certificate of transfer N/A N/A Q2 2025
Italy shall transfer EUR 1 381 000 000 to
the Implementing Partner(s) for the
Facility.
423
Sequential
Number
Related Measure
(Reform or
Investment)
Milestone
/ Target Name
Qualitative
indicators (for milestones)
Quantitative indicators (for targets)
Indicative
timeline for
completion Description of each milestone and
target Unit of
measure Baseline Goal Quarter Year
of public residential
housing
M7-49
Investment 17:
Financial
instrument for
energy renovations
of public residential
housing
Target
Legal
agreements
signed with final
beneficiaries
Percentage
(%) 0% 100% Q2 2026
Italy shall transfer additional
EUR 200 000 000 to the Implementing
Partner(s) for the Facility.
The Implementing Partner(s) shall have
entered into legal financing agreements
with final beneficiaries for an amount
necessary to use 100% of the RRF
investment into the Facility (taking into
account management fees).
424
2. ESTIMATED TOTAL COST OF THE RECOVERY AND RESILIENCE PLAN
The estimated total cost of the recovery and resilience plan of Italy is EUR 194 435 381 164.
The estimated total cost of the REPowerEU chapter is EUR 7 212 200 000. In particular, the
estimated total costs of the measures referred to in Article 21c(3), point (a) of Regulation
(EU)2023/435 is EUR 420 000 000whilst the costs of the other measures in the REPowerEU chapter
is EUR 6 792 200 000.
SECTION 2: FINANCIAL SUPPORT
1. Financial contribution
The instalments referred to in Article 2(2) shall be organised in the following manner:
1.1. First Instalment (non-repayable support):
Sequential
Number Related Measure
(Reform or Investment) Milestone /
Target Name
M1C1-51 Reform 1.9: Reform of
the public administration Milestone
Entry into force of primary legislation on the
governance of the Italian recovery and resilience plan
M1C1-52 Reform 1.9: Reform of
the public administration Milestone
Entry into force of primary legislation on
simplification of administrative procedures for the
implementation of the Italian recovery and resilience
plan.
M1C1-53
Investment 1.9: Provide
technical assistance and
strengthen capacity
building for the
implementation of the
Italian recovery and
resilience plan
Milestone
Entry into force of peirimary legislation to provide
technical assistance and strengthen capacity building
for the implementation of the Italian recovery and
resilience plan
M1C1-69 Reform 1.10: Reform of
the public procurement
legislative framework Milestone
Entry into force of the Decree on simplification of the
public procurement system
M1C1-1 Reform 1.1: ICT
Procurement Milestone
Entry into force of law decrees for reform 1.1 ‘ICT
Procurement’
M1C1-2 Reform 1.3: Cloud First
and Interoperability Milestone
Entry into force of law decrees for reform 1.3 ‘Cloud
First and Interoperability’
M1C1-29 Reform 1.4: Reform of
the civil justice Milestone
Entry into force of enabling legislation for the civil
Justice reform
M1C1-30 Reform 1.5: Reform of
criminal justice Milestone
Entry into force of enabling legislation for criminal
justice reform
M1C1-31 Reform 1.6: Reform of
insolvency framework Milestone
Entry into force of enabling legislation for insolvency
reform framework
M1C1-32
Investment 1.8:
Recruitment procedures
for civil, criminal and
administrative courts
Milestone Entry into force of special legislation governing
National Recovery and Resilience Plan recruitment
M1C1-54 Investment 1.9: Provide Target Completed recruitment of experts for the
425
Sequential
Number Related Measure
(Reform or Investment) Milestone /
Target Name
technical assistance and
strengthen capacity
building for the
implementation of the
Italian recovery and
resilience plan
implementation of the Italian recovery and resilience
plan
M1C1-55 Reform 1.9: Reform of
the public administration Milestone
Extending the methodology applied to the Italian
recovery and resilience plan to national budget to
increase absorption of investment
M1C1-68 Reform 1.9: Reform of
the public administration Milestone
Repository system for Audit and Controls:
information for monitoring implementation of RRF
M1C1-71 Reform 1.10: Reform of
the public procurement
legislative framework Milestone
Entry into force of all necessary legislation,
regulations and implementing acts (including
secondary legislation) for the public procurement
system
M1C1-100 Reform 1.13: Reform of
the spending review
framework Milestone
Entry into force of legislative provisions improving
the effectiveness of the spending review -
Reinforcement of Finance Ministry
M1C1-101 Reform 1.12: Reform of
the tax administration Milestone
Adoption of a review of possible actions to reduce tax
evasion
M1C2-1 Investment 1: Transition
4.0 Milestone
Entry into force of legal acts to make Transition 4.0
tax credits available to potential beneficiaries and
establishment of the Scientific Committee
M1C3-8 Investment – 4.1 Digital
Tourism Hub Milestone
Award of the contracts for the development of the
Digital Tourism Portal
M2C2-7
Reform 2 New
legislation to promote
renewable gas
production and
consumption
Milestone
Entry into force of a Legislative Decree to promote
the use of renewable gas for the use of biomethane in
the transport, industrial and residential sectors and an
Implementing Decree setting out the conditions and
criteria in relation to its use and the new incentive
system.
M2C2-37
Reform 5: Smarter
procedures for project
evaluation in the local
public transport systems
sector with fixed
installations and in the
rapid mass transport
sector
Milestone Entry into force of a Decree Law
M2C2-41 Investment 5.3: Electric
buses Milestone
Entry into force of a Ministerial Decree which
identifies the amount of available resources for
reaching the purpose of intervention (busses supply
chain)
M2C3-1
Investment 2.1-
Strengthening of the
Ecobonus for energy
efficiency
Milestone Entry into force of the extension of the Superbonus
M2C4-3
Reform 4.2 “Measures to
ensure full managerial
capacities for Integrated
water services”
Milestone Reform of the legal framework for a better
management and a sustainable use of water
M3C2-3 Reform 2.1-
Implementation of a Milestone
Entry into force of the Decree on the Single Customs
Desk (Sportello Unico Doganale)
426
Sequential
Number Related Measure
(Reform or Investment) Milestone /
Target Name
Single Customs Window
(“Sportello Unico
Doganale”)
M4C1-1
Reform 1.5: University
degree groups reform;
Reform 1.6: Enabling
university degrees
reform; Reform 4.1:
Ph.D. Programmes
Reform
Milestone
Entry into force of the reforms of the tertiary
education system to improve educational outcomes
(primary legislation) on: a) enabling university
degrees; b) university degree groups; c) reform of
PhD programs
M4C1-2 Investment 1.7:
Scholarships for
University access Milestone
Entry into force of ministerial decrees for reform on
scholarships to enhance access to tertiary education
M5C1-1 Reform 1- ALMPs and
Vocational Training Milestone
Entry into force of the Inter-Ministerial Decree
establishing a National programme for the Guaranteed
Employability of Workers (GOL) and an Inter-
Ministerial Decree establishing a National Plan for
New Skills
M5C2-1 Reform 1- Framework
law for disability Milestone
Entry into force of the Framework Law to strengthen
the autonomy of people with disabilities.
M5C2-5
Investment 1 -
Supporting vulnerable
people and preventing
institutionalization
Milestone Entry into force of the operational Plan
Instalment
Amount EUR 11 494 252 874
1.2. Second Instalment (non-repayable support):
Sequential
Number
Related Measure
(Reform or Investment) Milestone /
Target Name
M2C4-5 Investment 3.2:
Digitization of national
parks Milestone
Entry into force of the administrative simplification
and development of digital services to visitors to
national parks and marine protected areas
M5C2-9 Investment 3 - Housing
First and Post Stations Milestone
Entry into force of the operational Plan regarding
projects on Housing First and Post Stations, defining
the requirements of projects that can be presented by
local entities, and launch of call for proposal
M1C1-33 Investment 1.8:
Recruitment procedures
for administrative courts Target
Start of the recruitment procedures for administrative
courts
M1C1-56 Reform 1.9: Reform of
the public administration Milestone
Entry into force of the enabling legislation for the
reform of public employment
M1C1-70 Reform 1.10: Reform of
the public procurement
legislative framework Milestone
Entry into force of the revision of the Code of Public
procurement (D.Lgs. n. 50/2016)
M1C1-103 Reform 1.12: Reform of
the tax administration Milestone
Entry into force of primary and secondary legislation
and regulatory provisions and completion of
administrative processes for encouraging tax
compliance and improving audits and controls
427
Sequential
Number
Related Measure
(Reform or Investment) Milestone /
Target Name
M1C1-104 Reform 1.13: Reform of
the spending review
framework Milestone
Adoption of savings targets for spending reviews for
the years 2023-2025
M1C3-11
Investment 1.3 –
Improve energy
efficiency in cinema,
theatres and museums
Milestone Entry into force of the Ministry of Culture decree for
the allocation of resources: to improve energy
efficiency in places of culture
M2C1-1 Reform 1.1 - National
Strategy for Circular
Economy Milestone
Entry into force of the Ministerial Decree for the
adoption of the National Strategy for Circular
Economy
M2C1-2 Reform 1.3 - Technical
support for Local
Authorities Milestone
Approval of agreement for the development of the
Building capacity action plan to support local public
authorities
M2C1-11
Investment 3.3: Culture
and awareness on
environmental topics and
challenges
Milestone Launch of web platform and contracts with authors
M2C2-18 Investment 3.5 Hydrogen
Research and
Development Milestone
Award of all public R&D contracts to research
projects on hydrogen
M2C2-21 Reform 4 Measures to
promote hydrogen
competitiveness Milestone Entry into force of fiscal incentives
M2C2-38 Investment 5.1:
Renewables and batteries Milestone Entry into force of a Ministerial Decree
M2C2-42 Investment 5.4: Equity
injection into the Green
Transition Fund (“GTF”) Milestone Signature of the financial Agreement
M2C3-4
Reform 1.1:
Simplification and
acceleration of
procedures for energy
efficiency interventions
Milestone Simplification and acceleration of procedures for
energy efficiency interventions
M2C4-1
Reform 2.1.
Simplification and
acceleration of the
procedures for
implementing
interventions against
hydrogeological
instability
Milestone Entry into force of the simplification of the legal
framework for a better management of hydrological
risks
M2C4-4
Reform 4.2 “Measures to
ensure full managerial
capacities for Integrated
water services
Milestone Entry into force of the new legal framework of
irrigation purposes
M4C1-3 Reform 2.1: Teachers’
recruitment Milestone Entry into force of the reform on teaching profession.
M4C1-4
Investment 3.2: School
4.0: innovative schools,
wiring, new classrooms
and workshops
Milestone School 4.0 Plan to foster the digital transition of the
Italian school system is adopted
M4C2-4 Reform 1.1:
Implementation of R&D Milestone
Entry into force of Ministerial Decrees on R&D
simplification and mobility linked to the ordinary
428
Sequential
Number
Related Measure
(Reform or Investment) Milestone /
Target Name
support measures to
foster simplification and
mobility
financing fund.
Instalment
Amount EUR 11 494 252 874
1.3. Third Instalment (non-repayable support):
Sequential
Number Related Measure (Reform or
Investment) Milestone /
Target Name
M2C4-2 Reform 4.2 “Measures to ensure full
managerial capacities for Integrated
water services” Milestone
Entry into force of the reform to
ensure full managerial capacities for
Integrated water services
M1C1-3 Investment 1.1: Digital infrastructure Milestone Completion of the Polo Strategico
Nazionale (PSN)
M1C1-4 Investment 1.3.1: National Digital Data
Platform Milestone
National Digital Data Platform
operational
M1C1-5 Investment 1.5: Cybersecurity Milestone Creation of the new National Cyber
Security Agency
M1C1-6 Investment 1.5: Cybersecurity Milestone Initial deployment of the national
cybersecurity services
M1C1-7 Investment 1.5: Cybersecurity Milestone Startup of the network of
cybersecurity screening and
certification laboratories
M1C1-8 Investment 1.5: Cybersecurity Milestone Activation of a Central Audit Unit
for PSNC & NIS security measures
M1C1-9 Investment 1.5: Cybersecurity Target Support to the upgrade of security
structures T1
M1C1-10 Reform 1.2: Transformation support Milestone Entry into force of the setup of
Transformation Team and NewCo
M1C1-34 Investment 1.8: Recruitment procedures
for the office of trial for civil and
criminal Courts Target
Start of the recruitment procedures
for civil and criminal courts
M1C1-35 Reform 1.7: Reform of tax courts Milestone Comprehensive reform of tax courts
of first and second instance
M1C1-36 Reforms 1.4, 1.5 and 1.6: Reform of civil
and criminal justice and insolvency
reform Milestone
Entry into force of delegated acts for
the civil and criminal justice
reforms and of the insolvency
reform
M1C1-57 Reform 1.9: Reform of the public
administration Milestone
Entry into force of administrative
procedures for the simplification
reform aimed at implementing the
RRF
M1C1-102 Reform 1.13: Reform of the spending
review framework Milestone
Adoption of a report on the
effectiveness of practices used by
selected public administrations for
formulating and implementing
saving plans
M1C1-105 Reform 1.12: Reform of the tax
administration Target
Higher number of "compliance
letters"
429
Sequential
Number Related Measure (Reform or
Investment) Milestone /
Target Name
M1C1-106 Reform 1.12: Reform of the tax
administration Target
Reducing the number of false
positive "compliance letters”
M1C1-107 Reform 1.12: Reform of the tax
administration Target
Increase in the tax revenue
generated by "compliance letters"
M1C2-6 Reform 2: Annual Competition Laws Milestone Entry into force of the Annual
Competition Law 2021
M1C2-7 Reform 2: Annual Competition Laws Milestone Entry into force of all energy-related
implementing measures and
secondary legislation (if necessary)
M1C2-8 Reform 2: Annual Competition Laws Milestone
Entry into force of all implementing
measures (included secondary
legislation, if necessary) for the
effective implementation and
application of the measures
stemming from the 2021 Annual
Competition Law
M1C3-6 Reform – 3.1 Minimum Environmental
Criteria for Cultural events Milestone
Entry into force a decree defining
social and environmental criteria in
public procurement tenders
concerning cultural events publicly
financed
M2C1-3
Investment 2.1: Logistics plan for the
agri-food, fishing and aquaculture,
forestry, floriculture and plant nursery
sectors
Milestone Publication of final ranking under
the Logistic incentive scheme
M2C1-4 Investment 2.2: Agri-solar Park Target
Allocation of resources to the
beneficiaries as % of the total
financial resources assigned to the
investment
M2C2-8 Investment 2.1 Strengthening smart grids Milestone Award of (all) public contracts for to
increase the network capacity
M2C2-12 Investment 2.2 Interventions to increase
the resilience of power grid Milestone
Award of the projects to increase the
resilience of the electricity system
network
M3C2-1 Reform 1.1- Simplification of procedures
for the strategic planning process Milestone
Entry into force of legislative
modifications related to the
simplification of the procedures for
the strategic planning process
M3C2-2 Reform 1.2- Competitive award of
concessions in Italian ports Milestone
Entry into force of the Regulation
on port concessions
M3C2-4 Reform 1.3- Simplification of
authorisation procedures for cold ironing
plants Milestone
Entry into force of the simplification
of authorisation procedures for cold
ironing plants
M4C1-5
Reform 1.3: Reorganisation of the school
system; Reform 1.2: Reform of the
tertiary vocational training system (ITS);
Reform 1.1: Reform of Technical and
Professional Institutes; Reform 1.4:
Reform of the “Orientation” system
Milestones
Entry into force of the reforms of
the primary and secondary
education system to improve
educational outcomes
M4C1-6
Reform 2.2: Tertiary advanced school
and continuous training for school
managers, teachers, administrative and
technical staff
Milestone Entry into force of legislation aimed
at building a quality training system
for school.
430
Sequential
Number Related Measure (Reform or
Investment) Milestone /
Target Name
M4C2-1 Investment 1.2: Funding projects
presented by young researchers Target
Number of students awarded of a
research grant
M5C1-2 Reform 1 - ALMPs and Vocational
Training Milestone
Entry into force at the Regional
level of all plans for the Public
Employment Services (PES)
M5C1-6 Investment 1 - Strengthening Public
Employment Services (PES) Target
Public Employment Services (PES)
are implementing the activities
envisaged in the Strengthening Plan
over the three years period 2021-
2023
M5C1-8 Reform 2 - Undeclared Work Milestone
Entry into force of a National Plan
and implementation Road Map to
fight undeclared work across all
economic sectors.
M5C1-12 Investment 2 - Gender equality
certification system Milestone
Entry into force of gender equality
certification system and
accompanying incentive
mechanisms for companies
M5C2-7 Investment 2 - Autonomy patterns for
people with disabilities Target
Social districts have delivered at
least one project in relation to the
renovation of home spaces and/or
provision of ICT devices to disabled
people, accompanied by training on
digital skills
M5C3-1 Investment 1.1.1: Inner Areas-
Enhancement of community social
services and infrastructures Milestone
Award of the tender for the
interventions to improve social
services and infrastructures in Inner
Areas and for the support to
pharmacies in municipalities of less
than 3 000 inhabitants
M6C2-1
Reform 1: Revise and update the current
legal framework of the Scientific
Institutes for Hospitalisation and Care
(IRCCS) and research policies of the
Ministry of Health to strengthen the link
between research, innovation and
healthcare
Milestone
Entry into force of the legislative
decree envisaging the reorganisation
of the regulations governing the
Scientific institutes for
hospitalisation and care (IRCSS)
Instalment
Amount EUR 11 494 252 874
1.4. Fourth Instalment (non-repayable support):
Sequential
Number
Related Measure (Reform or
Investment) Milestone /
Target Name
M1C1-11 Investment 1.6.6: Digitization of the
Finance Police Target
Finance Police - Purchase of
professional data science services
T1
M1C1-72 Reform 1.11: Reduction of late payments
by public administrations and health
authorities Milestone
Measures to reduce late payments
from the public administration to
businesses are approved
431
Sequential
Number
Related Measure (Reform or
Investment) Milestone /
Target Name
M1C1-73 Reform 1.10: Reform of the public
procurement legislative framework Milestone
Entry into force of the reform of the
Public Procurement Code
M2C2-14 Investment 3.3 Hydrogen testing for road
transport Milestone
Award of (all) public contracts for
the development of re-charging
stations based on hydrogen
M2C2-16 Investment 3.4 Hydrogen testing for
railway mobility Milestone
Allocation of resources for
hydrogen testing for railway
mobility
M2C2-20 Reform 3 Administrative simplification
and reduction of regulatory barriers to
hydrogen deployment Milestone
Entry into force of the necessary
legislative actions
M5C2-3 Reform 2 - Reform for non-self-
sufficient elderly persons Milestone
Entry into force of a Framework
Law which strengthens the actions
in favour of non self-sufficiency
elderly people
M1C1-37 Reforms 1.4 and 1.5: Reform of civil and
criminal justice Milestone
Entry into force of the civil and
criminal justice reform
M1C1-58 Reform 1.9: Reform of the public
administration Milestone
Entry into force of legal acts for the
reform of public employment
M1C1-74 Reform 1.10: Reform of the public
procurement legislative framework Milestone
Entry into force of all necessary
implementing measures and
secondary legislation for the reform
on simplification of the public
procurement code
M1C1-109 Reform 1.12: Reform of the tax
administration Target
Sending first pre-populated VAT
tax returns
M2C2-27 Investment 4.3 Installation of charging
infrastructures Milestone
Award of all public contracts for
the installation of charging
infrastructures M1
M2C2-33
Investment 4.4.2: Strengthening of the
regional public transport railway fleet
with zero emission trains and universal
service
Milestone
Award of all public contracts for
the strengthening of regional public
transport railway fleet with zero
emission trains and universal
service
M2C3-2 Investment 2.1- Strengthening of the
Ecobonus for energy efficiency Target Building renovation Superbonus T1
M4C1-9 Investment 1.1: Plan for nurseries and
preschools and early childhood education
and care services Milestone
Award of contracts for building,
renovating and ensuring the safety
of nurseries, preschools and early
childhood education and care
services
M5C3-8
Investment 1.3: Structured socio-
educational interventions to combat
educational poverty in the South
supporting the Third Sector
Target Educational support to minors (first
batch)
Instalment
Amount EUR 2 315 646 882
432
1.5. Fifth Instalment (non-repayable support):
Sequential
Number Related Measure (Reform or
Investment) Milestone /
Target Name
M1C2-4 Reform 1: Reform of the Industrial
Property System Milestone
Entry into force of a Legislative
Decree aimed at reforming the
Italian industrial property code and
the relevant implementing acts
M1C3-4 Investment - 1.3 Improve energy
efficiency in cinema, theatres and
museums Target
Interventions on State museums
and cultural sites, theatrical halls
and cinemas concluded (first batch)
M1C1-12 Investment 1.3.2: Single Digital Gateway Target Single Digital Gateway
M1C1-13 Investment 1.4.6: Mobility as a Service
for Italy Milestone Mobility as a Service solutions M1
M1C1-38 Reform 1.8: Digitalisation of Justice Milestone Digitalisation of the justice system
M1C1-59 Reform 1.9: Reform of the public
administration Milestone
Entry into force of strategic human
resource management in the Public
Administration M1C1-
73quater Reform 1.10: Reform of the public
procurement legislative framework Milestone
Entry into force of guidelines on
below-EU threshold procurement
M1C1-75 Reform 1.10: Reform of the public
procurement legislative framework Milestone
Full operation of the National
eProcurement System
M1C1-84 Reform 1.10: Reform of the public
procurement legislative framework Target
Average time between the
publication and the contract award
M1C1-86 Reform 1.10: Reform of the public
procurement legislative framework Target
Civil servants trained through the
Public Buyers Professionalization
Strategy
M1C1-87 Reform 1.10: Reform of the public
procurement legislative framework Target
Contracting authorities using
dynamic purchasing systems
M1C1-110 Reform 1.13: Reform of the spending
review framework Milestone
Re-classification of the general
State budget, with reference to the
environmental expenditure and to
the expenditure that promotes
gender equality
M1C2-9 Reform 2: Annual Competition Laws Milestone Entry into force of the Annual
Competition Law 2022
M1C2-10 Reform 2: Annual Competition Laws Milestone
Entry into force of all implementing
measures (included secondary
legislation, if necessary) for the
effective implementation and
application of the measures
stemming from the 2022 Annual
Competition Law
M1C3-7 Investment – 3.3 Capacity building for
culture operators to manage the digital
and green transition. Milestone
Award of all public contracts with
the implementing
organisation/beneficiaries for all
interventions to manage the digital
and green transition of cultural
operators
M2C1-5 Investment 2.2: Agri-solar Park Target
Allocation of resources to the
beneficiaries as % of the total
financial resources assigned to the
investment
433
Sequential
Number Related Measure (Reform or
Investment) Milestone /
Target Name
M2C2-22 Investment 4.1 Investment in soft
mobility (National Plan of Cycle Path) Target: Cycling lanes T1
M4C1-10
Reform 2.1: Teachers’ recruitment;
Reform 1.3: Reorganisation of the school
system; Reform 1.2: Reform of the
tertiary vocational training system (ITS);
Reform 1.4: Reform of the “Orientation”
system; Reform 1.5: University degree
groups reform; Reform 1.6: Enabling
university degrees reform
Milestone
Entry into force of regulations for
the effective implementation and
application of all the measures
concerning the reforms of primary,
secondary and tertiary education,
where needed
M4C1-11 Investment 1.7: Scholarships for
University access Target University scholarship awarded
M5C3-3 Investment 2: Territorial proximity health
facilities Target
Support to rural pharmacies in
municipalities, hamlets or
settlements of less than 5 000
inhabitants (first batch)
M1C1-113 Reform 1.12: Reform of the tax
administration Target
Higher number of "compliance
letters"
M1C1-114 Reform 1.12: Reform of the tax
administration Target
Increase in the tax revenue
generated by "compliance letters"
Instalment
Amount EUR 3 621 492 701
1.6. Sixth Instalment (non-repayable support):
Sequential
Number
Related Measure (Reform or
Investment) Milestone /
Target Name
M1C1-14bis Reform 1.9bis: Reform for accelerating
the implementation of cohesion policy Milestone
Entry into force of the national
legislation for accelerating the
implementation of cohesion policy
M1C1-15 Investment 1.6.6: Digitization of the
Finance Police Target
Finance Police - Purchase of
professional data science services T2
M1C1-37bis Reform 1.4: Reform of civil justice Milestone Entry into force of measures aimed
at reducing backlog
M1C1-72bis Reform 1.11: Reduction of late payments
by public administrations and health
authorities Milestone
Legislative and specific actions to
reduce late payments at central/local
levels
M1C1-85 Reform 1.10: Reform of the public
procurement legislative framework Target
Average time between the contract
award and the realization of the
infrastructure
M1C1-99 Reform 1.10: Reform of the public
procurement legislative framework Target
Contracting authorities using
dynamic purchasing systems
M2C2-6
Reform 1 Simplification of authorization
procedures for renewable onshore and
offshore plants and new legal framework
to sustain the production from renewable
sources and time and eligibility
extension of the current support schemes
Milestone
Entry into force of a legal
framework for the simplification of
the authorisation procedures for
building-up structures for onshore
and off-shore renewable energies
434
Sequential
Number
Related Measure (Reform or
Investment) Milestone /
Target Name
M4C1-8 Investment 1.3: School Sports
Infrastructure Enhancement Plan Milestone
Award of contracts for interventions
to build and renovate sports facilities
and gyms for school use
M5C1-9 Reform 2 - Undeclared Work Milestone Carry out actions to fight undeclared
work
M5C2-4 Reform 2- Reform for non-self-sufficient
elderly persons Milestone
Entry into force of the legislative
decrees that develop the provisions
set out by the Framework Law to
strengthen the actions in favour of
non self-sufficiency elderly people
M7-9 Reform 5: Plan for new Skills -
Transitions Milestone
Adoption and publication of the New
Skills Plan – Transitions and of the
Road Map for implementation
M7-32
Investment 12 Financial Instrument for
the development of an international,
industrial and R&D leadership in zero-
emission buses
Milestone Implementing Agreement
M1C1-39 Investment 1.8: Recruitment procedures
for civil and criminal courts Target
Conclusion of the recruitment
procedures for civil and criminal
courts and territorial and central
services of the Ministry of Justice
responsible for the implementation
of the RRP
M1C1-40 Investment 1.8: Recruitment procedures
for administrative courts Target
Conclusion of recruitment
procedures for administrative courts
M1C1-41 Investment 1.8: Recruitment procedures
for administrative courts Target
Reduction of backlog cases for
Administrative Regional Courts
M1C1-42 Investment 1.8: Recruitment procedures
for administrative courts Target
Reduction of backlog cases for the
Council of State
M1C1- 59 BIS Reform 1.9: Reform of the public
administration Milestone
Implementation of strategic human
resource management in the Public
Administration
M1C1-73bis Reform 1.10: Reform of the public
procurement legislative framework Milestone
Adoption of a circular providing
guidance on the qualification system
for contracting authorities
M1C1-108 Reform 1.15: Reform of public
accounting rules Milestone
Approval of the Conceptual
framework, the Set of accrual
accounting standards and the
Multidimensional Chart of Accounts
M1C1-111 Reform 1.13: Reform of the spending
review framework Milestone
Completion of the yearly spending
review for 2023, with reference to
the saving target set in 2022 for 2023
M1C1-112 Reform 1.12: Reform of the tax
administration Target
Improve the operational capacity of
the tax administration in line with
the hiring objectives ofas indicated
in the “Performance plan 2021-
2023” of the Revenue Agency
M1C2-2 Investment 1: Transition 4.0 Target Transition 4.0 tax credits granted to
firms based on tax returns presented
in 2021-2022
M1C3-9 Investment 4.1 Digital Tourism Hub Target Involvement of touristic operators in
the Digital Tourism Hub
M1C3-10 Reform 4.1 Regulation ordering of the Milestone Definition of a national standard for
435
Sequential
Number
Related Measure (Reform or
Investment) Milestone /
Target Name
professions of tourist guides. tourist guides
M2C1-6 Investment 2.2: Agri-solar Park Target
Allocation of resources to the
beneficiaries as % of the total
financial resources assigned to the
investment
M3C2-5 Investment 2.1- Digitalisation of the
logistic chain Target Digitalisation of the logistic chain
M5C2-2 Reform 1- Framework law for disability Milestone
Entry into force of the legislative
decrees developing the provisions
set out by the Framework Law to
strengthen the autonomy of people
with disabilities
Instalment
Amount EUR 2 053 579 667
1.7. Seventh Instalment (non-repayable support):
Sequential
Number Related Measure (Reform or
Investment) Milestone /
Target Name
M1C1-17 Investment 1.1: Digital infrastructure Target Migration to the Polo Strategico
Nazionale T1
M7-7 Reform 4: Mitigation of financial risk
associated with renewable PPAs (Power
Purchase Agreements) Milestone
Entry into force of primary and
secondary legislation
M7-14 Investment 4: Tyrrhenian link Milestone Award of contracts
M3C2-7 Investment 2.3: Cold ironing Milestone Award of all public contracts
M1C1-18 Investment 1.3.1: National Digital Data
Platform Target
APIs in National Digital Data
Platform T1
M1C1-19 Investment 1.5: Cybersecurity Target Support to the upgrade of security
structures T2
M1C1-20 Investment 1.5: Cybersecurity Milestone Full deployment of national
cybersecurity services
M1C1-21 Investment 1.5: Cybersecurity Milestone
Completion of the network of
cybersecurity screening and
certification laboratories,
Evaluation Centers
M1C1-22 Investment 1.5: Cybersecurity Milestone
Full operation of the Central Audit
Unit for PSNC & NIS security
measures with at least 30
inspections completed
M1C1-43 Reform 1.4: Reform of civil justice Target Reduction of backlog cases for
Civil Ordinary Courts (first
instance)
M1C1-44 Reform 1.4: Reform of civil justice Target Reduction of backlog cases for the
Civil Court of Appeal (second
instance)
M1C1-60 Reform 1.9: Reform of the public
administration Target
Simplification and/or digitalization
of 200 critical procedures affecting
citizens and business
436
Sequential
Number Related Measure (Reform or
Investment) Milestone /
Target Name
M1C1-72ter Reform 1.11: Reduction of late payments
by public administrations and health
authorities Milestone
Increase human resources dealing
with payments
M1C1-
72quater
Reform 1.11: Reduction of late payments
by public administrations and health
authorities Milestone Adoption of the action plan
M1C1-73ter Reform 1.10: Reform of the public
procurement legislative framework Milestone
Incentives to qualification and
professionalisation of contracting
authorities. M1C1-
73quinquies Reform 1.10: Reform of the public
procurement legislative framework Milestone
Entry into force of new legal
provisions on project financing
M1C1-75bis Investment 1.10: Support to
Qualification and eProcurement Milestone
Support to Qualification and
eProcurement
M1C1-84bis Reform 1.10: Reform of the public
procurement legislative framework Milestone
Measures to improve decision
speed in contract award of
contracting authorities
M1C1-98 Reform 1.10: Reform of the public
procurement legislative framework Target
Civil servants trained through the
Public Buyers Professionalization
Strategy
M1C2-11 Reform 2: Annual Competition Laws Milestone Entry into force of the Annual
Competition Law 2023
M1C2-12 Reform 2: Annual Competition Laws Milestone
Entry into force of implementing
measures (including secondary
legislation, if necessary) for the
implementation and application of
the measures established in 2023
Annual Competition Law and other
primary legislations
M2C1-6bis Investment 2.2: Agri-solar Park Target
Allocation of resources to the
beneficiaries as % of the total
financial resources assigned to the
investment
M2C1-7 Investment 2.3: Innovation and
mechanization in the agricultural and
food sectors Target
Publication of final rankings with
identification of the final recipients.
M2C2-28 Investment 4.3 Installation of charging
infrastructures Milestone
Award of public contracts for the
installation of charging
infrastructures
M4C1-12
Investment 4.1: Extension in number and
career opportunities of PhDs (Research-
oriented, Public Administration and
Cultural Heritage)
Target PhD fellowships programmes
granted per year (over three years)
M4C1-14 Reform 2.1: Teachers’ recruitment Target Teachers recruited with the
reformed recruitment system
M4C1-15 Investment 1.7: Scholarships for
University access Target
Scholarships for university access
awarded
M4C2-3
Investment 3.3: Award of PhD
scholarships in collaboration with
enterprises and promote the hiring of
researchers by companies
Target Number of PhDs scholarships
awarded
M5C1-15bis Investment 4 - Universal Civil Service Milestone Carry out actions to increase the
participation of young people,
437
Sequential
Number Related Measure (Reform or
Investment) Milestone /
Target Name
simplify procedures and improve
the quality of the Universal Civil
Service (UCS) projects,
M7-1 Reform 1: Streamlining permitting
procedures for renewable energy Milestone
Identification of “renewables
acceleration areas”
M7-4 Reform 2: Reduction of Environmental
Harmful Subsidies Milestone
Adoption of a government report,
presenting the outcome of a
government consultation with
stakeholders to define the roadmap
to reduce environmentally harmful
subsidies.
M7-16 Investment 5: SA.CO.I.3 Milestone Award of contracts
M4C1-10 bis Reform 1.1: Reform of technical and
professional Institutes Milestone
Entry into force of the secondary
legislation.
Instalment
Amount EUR 5 294 563 760
1.8. Eighth Instalment (non-repayable support):
Sequential
Number Related Measure (Reform or
Investment) Milestone /
Target Name
M1C1-23 Investment 1.4.6: Mobility as a Service
for Italy Milestone
Implementation of seven pilot
projects
M1C1-76 Reform 1.11: Reduction of late payments
by public administrations and health
authorities Target
Average number of days for the
central public authorities to pay
businesses is reduced
M1C1-77 Reform 1.11: Reduction of late payments
by public administrations and health
authorities Target
Average number of days for the
regional public authorities to pay
businesses is reduced
M1C1-78 Reform 1.11: Reduction of late payments
by public administrations and health
authorities Target
Average number of days for the
local public authorities to pay
businesses is reduced
M1C1-79 Reform 1.11: Reduction of late payments
by public administrations and health
authorities Target
Average number of days forpublic
health authorities to pay businesses
is reduced
M1C1-25 Investment 1.6.6: Digitization of the
Finance Police Milestone
Evolve the information systems in
use for fighting economic crime
M1C1-62 Reform 1.9: Reform of the public
administration Milestone Increase absorption of investment
M1C1-115 Reform 1.13: Reform of the spending
review framework Milestone
Completion of the yearly spending
review for 2024, with reference to
the saving target set in 2022 and
2023 for 2024
M1C2-3 Investment 1: Transition 4.0 Target Transition 4.0 tax credits granted to
firms based on tax returns
presented in 2021-2023
M4C1-16 Investment 3.1: New skills and new
languages Milestone
Adoption of grant award
decision(s) for the activation fo
STEM projects
438
Sequential
Number Related Measure (Reform or
Investment) Milestone /
Target Name
M4C1-17 Investment 3.1: New skills and new
languages Milestone New Skills
M4C2-1 bis Investment 1.2: Funding projects
presented by young researchers Milestone
Publication of the decree(s)
awarding the funding to young
researchers
M6C2-2
Investment 2.1: Strengthening and
enhancement of the NHS biomedical
research
Target
Research projects funded on PoC
(Proof of Concept) and rare cancers
and diseases
M6C2-3
Investment 2.1: Strengthening and
enhancement of the NHS biomedical
research
Target
Research projects funded on
diseases with a high impact on
health
M7-2 Reform 1: Streamlining permitting
procedures for renewable energy Milestone
Entry into force of the legal act
(Testo Unico)
M7-25 Investment 8: Sustainable, circular and
secure supply of Critical Raw Materials Milestone
Publication of the report on the
future needs for CRM and the
potential of eco-design
M1C2-14bis Reform 3: Rationalization and
simplification of incentives for firms. Milestone
Publication of the report evaluation
all incentives for firms
M5C1-15 Investment 3 - Strengthening the dual
system Target
Certificates issued through the dual
education system
M2C1-12 Investment 3.3: Culture and awareness
on environmental topics and challenges Target
Podcasts on environmental
transition
M4C1-19
Investment 3.2: School 4.0: innovative
schools, wiring, new classrooms and
workshops
Milestone
Adoption of grant award
decision(s) for the purchase of
digital devices and/or the creation
of digital laboratories
M1C1-98bis Reform 1.10: Reform of the public
procurement legislative framework Target
Civil servants trained through the
Public Buyers Professionalization
Strategy
Instalment
Amount EUR 3 541 589 877
1.9. Ninth Instalment (non-repayable support):
Sequential
Number Related Measure (Reform or
Investment) Milestone /
Target Name
M4C1-7
Investment 1.4: Extraordinary
intervention aimed at the reduction of
territorial gaps in I and II cycles of
secondary school and at tackling school
drop-out
Target Students or young people who have
participated mentoring activities or
training courses
M4C1-14 bis Reform 2.1: Teachers’ recruitment Target Teachers recruited within the
reformed recruitment system
M7-6 Reform 3: Reduction of the costs of
connection to the gas network of
biomethane Milestone
Entry into force of legal acts to
reduce the costs of connection to
the gas network of biomethane
production plants
M7-10 Reform 5: Plan for new Skills -
Transitions Milestone
Entry into force of legal act(s) for
regions and autonomous province(s)
439
Sequential
Number Related Measure (Reform or
Investment) Milestone /
Target Name
M1C1-24 Investment 1.7.1: Digital Civil Service Target Individuals participated in the
Digital Civil Service
M1C1-49 Investment 1.8: Recruitment procedures
for administrative courts Target
Reduction of backlog cases for
Administrative Regional Courts
(first instance)
M1C1-50 Investment 1.8: Recruitment procedures
for administrative courts Target
Reduction of backlog cases for the
Council of State
M1C1-96 Reform 1.10: Reform of the public
procurement legislative framework Target
Average time between the
submission of tenders and the
contract award
M1C1-116 Reform 1.12: Reform of the tax
administration Target
Reduction of tax evasion as defined
by the indicator "propensity to
evade"
M1C2-5 Investment 6: Investment in the
Industrial Property System Target
Provision of final activities report
for at least 254 projects related to
Industrial Property and research
M1C2-13 Reform 2: Annual Competition Laws Milestone Entry into force of the Annual
Competition Law 2025
M1C2-14 Reform 2: Annual Competition Laws Target Millions of 2G smart meters
installed
M1C3-2 Investment - 1.1 Digital Strategy and
Platforms for Cultural Heritage Target
Published digital and media
resources
M1C3-5 Investment – 1.3 Improve energy
efficiency in cinema, theatres and
museums Target
Interventions on State museums and
cultural sites, theatrical halls and
cinemas are concluded (second
batch)
M2C3-3 Investment 2.1- Strengthening of the
Ecobonus for energy efficiency Target Building renovation Superbonus T2
M4C1-13 Investment 2.1: Integrated digital
teaching and training on the digital
transformation for school staff ; Target
Training of school managers,
teachers and administrative staff
M4C2-2bis Investment 2.2 bis: Innovation
Agreements Target
Innovation Agreements for which
the Ministry of Enterprises and
Made in Italy has confirmed
acceptance of the transmission of
final reports by beneficiaries
M5C1-3 Reform 1 - ALMPs and Vocational
Training Target
People benefitting from the
Guaranteed Employability of
Workers (GOL) Programme
M5C1-4 Reform 1 - ALMPs and Vocational
Training Target
People participated in training
programmes
M5C1-7 Investment 1 - Strengthening Public
Employment Services (PES) Target
Public Employment Services (PES)
have finalised the activities
envisaged in the Strengthening Plan
M5C1-10 Reform 2 - National Plan tackling
undeclared work Target
Increased number of labour
inspections and membership of the
network ‘rete del lavoro agricolo di
qualità’
M5C3-9
Investment1.3: Structured socio-
educational interventions to combat
educational poverty in the South
Target Educational support to minors
(second batch)
440
Sequential
Number Related Measure (Reform or
Investment) Milestone /
Target Name
supporting the Third Sector
M7-5 Reform 2: Reduction of Environmental
Harmful Subsidies Milestone Entry into force of legal act(s)
M7-26 Investment 8: Sustainable, circular and
secure supply of Critical Raw Materials Milestone
Geographical Information system
platform available online
M1C1-38bis Reform 1.8: Digitalisation of Justice Milestone Digitalisation of the justice system
M1C1-
72quinquies
Reform 1.11: Reduction of late payments
by public administrations and health
authorities Milestone
Publication of information and data
on payments made by the public
administration
M1C1-
72sexies
Reform 1.11: Reduction of late payments
by public administrations and health
authorities Milestone Final audit report of the Audit Plan
M1C1-27 Investment 1.3.1: National Digital Data
Platform Target
APIs in National Digital Data
Platform T2
M1C1-97ter
Reform 1.10 : Reform of the public
procurement legislative framework Milestone
Measures to improve execution
speed
M4C2-4bis
Reform 1.2: Three-year plan for the
financing of research activities Milestone
Primary legislation for the adoption
of the three-year plan for the
financing of research activities
M7-30
Investment 10: Pilot project on skills
“Crescere Green” Target Training certificates
M1C1-144
Investment 1.4.2 - Citizen inclusion -
Accessibility improvement of digital
public services/interventions
implemented
Target
Increased accessibility of digital
public services/interventions
implemented
M2C2-36
Investment 4.4.3: Renewal fleet for the
National fire brigade command Target
Number of clean vehicles for the
renewal fleet for the National fire
brigade command
M2C4-32
Investment 4.2. Reduction of losses in
water distribution networks, including
digitization and monitoring of networks
Milestone Districting in water distribution
networks
M1C1-153
Investment 1.6.2 - Digitization of the
Ministry of Justice Target Digitized judicial files T2
M6C2-17
Investment 2.2: Development of
technical-professional, digital and
managerial skills of professionals in the
healthcare system
Target Award of medical
specialist training contracts
Instalment
Amount EUR 7 670 089 282
1.10. Tenth Instalment (non-repayable support):
Sequential
Number
Related Measure (Reform or
Investment) Milestone /
Target Name
M1C1-88 Reform 1.11: Reduction of late
payments by public administrations Target
Average number of days for the
central public authorities to pay
441
Sequential
Number
Related Measure (Reform or
Investment) Milestone /
Target Name
and health authorities businesses is reduced
M1C1-89 Reform 1.11: Reduction of late
payments by public administrations
and health authorities Target
Average number of days for the
regional public authorities to pay
businesses is reduced
M1C1-90 Reform 1.11: Reduction of late
payments by public administrations
and health authorities Target
Average number of days for the
local public authorities to pay
businesses is reduced
M1C1-91 Reform 1.11: Reduction of late
payments by public administrations
and health authorities Target
Average number of days for public
health authorities to pay businesses
is reduced
M1C1-117 Reform 1.15: Reform of public
accounting rules Target
Representatives of public entities
trained on the new accrual
accounting system
M1C1-119 Reform 1.14: Reform of the
subnational fiscal framework Milestone
Definition of the parameters for the
regional fiscal federalism
M1C1-120 Reform 1.14: Reform of the
subnational fiscal framework Milestone
Entry into force of the legal acts
defining the fiscal federalism for
provinces and metropolitan cities.
M5C1-11 Reform 2 - Undeclared Work Milestone Carry out actions to fight
undeclared work
M3C2-12 Investment 2.3: Cold ironing Target
Completion of works and
acceptance of connection cost
estimates by the developer for cold
ironing infrastructures
M1C1-28 Investment 1.7.2: Network of digital
facilitation services Target
Number of citizens participating in
digital education and/or facilitation
initiatives provided by digital
facilitation centres
M1C1-45 Reform 1.4: Reform of civil justice Milestone Reduction in the length of civil
proceedings
M1C1-46 Reform1.5: Reform of criminal justice Milestone Reduction in the length of criminal
proceedings
M1C1-47 Reform 1.4: Reform of civil justice Target Reduction of backlog cases for the
Civil Ordinary Courts (first
instance)
M1C1-48 Reform 1.4: Reform of civil justice Target Reduction of backlog cases for the
Civil Court of Appeal (second
instance)
M1C1-59ter Reform 1.9: Reform of the public
administration Milestone
Implementation of strategic human
resource management in the Public
Administration
M1C1-63 Reform 1.9: Reform of the public
administration Milestone
Publication of a repository of
simplified and/or digitalised
procedures
M1C1-66
Investment 1.9: Provide technical
assistance and strengthen capacity
building for the implementation of the
Italian recovery and resilience plan
Target Attendance reports on Syllabus
platform
M1C1-118 Reform 1.15: Reform of public
accounting rules Milestone
Issuance of financial statements and
entry into force of the legislative act
on the accrual accounting reform
for public sector entities covering at
least 90% of the primary
442
Sequential
Number
Related Measure (Reform or
Investment) Milestone /
Target Name
expenditure of the whole public
sector, net of State-owned
companies.
M1C1-122 Reform 1.13: Reform of the spending
review framework Milestone
Completion of the yearly spending
review for 2025, with reference to
the saving target set in 2022, 2023
and 2024 for 2025.
M1C2-13bis Reform 2: Annual Competition Laws Milestone
Entry into force of legal act(s) on
Regional Railways and Technology
Transfer
M1C3-3
Investment - 1.2 Removal of physical
and cognitive barriers in museums,
libraries and archives to enable wider
access to and participation in culture
Target Interventions in museums,
monuments, archeological areas and
parks, archives and libraries
M2C1-8 Investment 2.3: Innovation and
mechanization in the agricultural and
food sectors Target Projects carried out
M2C1-9 Investment 2.2: Agri-solar Park Target Solar power generation capacity
installed
M2C2-23 Investment 4.1 Investment in soft
mobility (National Plan of Cycle Path) Target
Administrative certificates for the
construction of cycling lanes
M4C1-20
Investment 1.5: Development of the
tertiary vocational training system
(ITS)
Target Number of students enrolled in
vocational training system (ITS)
M4C1-22 Investment 1.3: School Sports
Infrastructure Enhancement Plan Target
Construction or renovation of sport
facilities for school use
M4C1-23 Investment 3.4: Teaching and advanced
university skills Milestone
Actions to qualify and innovate
secondary schools and university
programmes, including PhDs.
M4C1-24 Investment 1.6: Active orientation in
school-university transition. Target
Attendance certificates that have
been issued for school-university
transition courses
M5C1-7bis Investment 1 - Strengthening Public
Employment Services (PES) Target
Infrastructural activities in Public
Employment Services (PES)
M5C1-14 Investment 2 - Gender equality
certification system Target
Undertakings have obtained the
gender equality certification
M5C1-16 Investment 4 - Universal Civil Service Target Certificates issued for the Universal
Civil Service projects
M7-3 Reform 1: Streamlining permitting
procedures for renewable energy Milestone
Establishment of the digital
platform for authorizations related
to renewables
M7-11 Investment 1: Scale-up measure: Smart
grids Milestone
Increase in maximum power
delivered for consumption by the
grid
M7-12 Investment 2: Scale-up measure:
Interventions to increase the resilience
of power grid Milestone
Increase the resilience of the
electric grid
M7-13 Investment 3: Scale-up measure:
Production of Hydrogen in brownfield
sites (Hydrogen Valleys) Target Electrolysers installed
M7-15 Investment 4: Tyrrhenian link Milestone Cable(s) laid down
M7-17 Investment 5: SA.CO.I.3 Milestone Construction of the shells of the
conversion stations in Sardinia
443
Sequential
Number
Related Measure (Reform or
Investment) Milestone /
Target Name
(Codrongianos) and Tuscany
(Suvereto)
M7-22 Investment 7: Smart National
Transmission Grid Milestone
Installation of 5G equipment, ICT
architecture, information
communication technology
architecture, secure protocol 104 in
electric stations and monitoring
systems in electricity pylons
M7-27 Investment 8: Sustainable, circular and
secure supply of Critical Raw Materials Milestone
Equipment of laboratories on Urban
mining and eco-design
M7-31
Investment 11: Strengthening of the
regional public transport railway fleet
with zero emission trains and universal
service
Target Number of trains procured
M2C2-30 Investment 4.5 - Private and light
commercial vehicle fleet renewal
program with electric vehicles
Target Number of vehicles purchased
M1C2-14ter Reform 3: Framework for
simplification of incentives for firms. Milestone
Entry into force of primary
legislation
M4C1-14ter Reform 2.1: Teachers’ recruitment Milestone Decrees approving teachers public
competition lists M1C1-
121bis
Reform 1.12: Reform of the tax
administration Milestone
Entry into force of legal act(s) for
improving tax collection
M2C2-29 Investment 4.3 Installation of charging
infrastructures Target
Number of fast rcharging stations
infrastructure points
M4C1-15bis Investment 1.7: Scholarships for
University access Target
Scholarships for university access
awarded
M5C1-4bis Reform 1 - ALMPs and Vocational
Training Target People participating in training
M1C1-147 Investment 1.2 - Cloud enablement for
local PA Target
Cloud enablement for local Public
Administration T2
M1C1-148
Investment 1.4.1 - Citizen experience -
Improvement of the quality and the
usability of digital public services
Target
Increase in the quality and the
usability of digital public services
T2
M2C2-10 Investment 2.1 Strengthening smart
grids Milestone
Increase in the network hosting
capacity and maximum power
delivered for consumption
M2C2-13 Investment 2.2 Interventions to
increase the resilience of power grid Milestone
Increase the resilience of the
electric grid
M2C2-35
Investment 4.4.1: Strengthening of the
regional public transport bus fleet with
zero-emission buses
Target Number of zero- emission buses
registered T2
M2C2-35 ter
Investment 4.4.1: Strengthening of the
regional public transport bus fleet with
zero-emission buses
Target Number of charging points for zero-
and low emissions buses
M6C2-16
Investment 2.2: Development of
technical-professional, digital and
managerial skills of professionals in the
healthcare system
Target
Trainings on managerial and digital
skills as well as trainings on safety
in terms of hospital infections for
employees of the National Health
Service
M1C1-149
Investment 1.4.3 - Adoption scale up of
PagoPA platform services and the “IO”
app
Target Adoption scale up of PagoPA
platform services T2
444
Sequential
Number
Related Measure (Reform or
Investment) Milestone /
Target Name
M1C1-150
Investment 1.4.3 - Adoption scale up of
PagoPA platform services and the “IO”
app
Target Adoption scale up of “IO” app T2
M1C1-152 Investment 1.6.1 - Digitization of the
Ministry of the Interior Target
Ministry of Interior - re-engineered
or digitized processes or services T2
M1C1-154 Investment 1.6.2 - Digitization of the
Ministry of Justice Target
Justice Data Lake knowledge
systems T2
M7-50
Investment 18 - Scale-up measure:
Private and light commercial vehicle
fleet renewal program with electric
vehicles
Target Number of vehicles purchased
M1C1-151 Investment 1.4.5 - Digitization of
public notices Target
Adoption of the Digital Notification
Platform T2
M1C1-155
Investment 1.6.3 - Digitization of
National Social Security Institute
(INPS) and National Institute for
Insurance against Accidents at work
(INAIL)
Target INAIL - Re-engineered and
digitized processes/services T2
M2C2-55 Investment 5.5 - Green tax credit Target Tax credits granted to firms based
on documents presented in 2024-
2025
M2C4-20bis
Investment. 3.1: Protection and
enhancement of urban and peri-urban
forests
Target Transplant trees or shrubs T3
Instalment
Amount EUR 12 799 902 997
445
2. Loan support
The instalments referred to in Article 3(2) shall be organised in the following manner:
2.1.First Instalment (loan support):
Sequential
Number Related Measure (Reform or
Investment) Milestone /
Target Name
M4C2-10 Investment 2.1: IPCEI Milestone
Launch of the call for expression
of interest for the identification of
the national projects, including
projects on IPCEI microelectronic
M1C2-26 Investment 5.1: Refinancing and
remodelling of Fund 394/81 managed by
SIMEST Milestone
Entry into force of the re-
financing of Fund 394/81 and
adoption of the investment policy
M2C1-14
Investment 1.1 - Implementation of new
waste management plants and
modernization of existing plants;
Investment 1.2 - Circular economy
“flagship” projects
Milestone Entry into force of the Ministerial
Decree.
M2C4-8 Investment 1.1. Implementation of an
advanced and integrated monitoring and
forecasting system Milestone
Operational Plan for an advanced
and integrated monitoring and
forecast system to identify
hydrological risks
M5C1-17 Investment 5 - Creation of women's
enterprises Milestone
The Fund to support women’s
entrepreneurship is adopted
M1C2-27 Investment 5.1: Refinancing and
remodelling of Fund 394/81 managed by
SIMEST Target
SMEs that received support from
Fund 394/81
M1C3-22 Investment 4.2 Funds for the
competitiveness of tourism enterprise Milestone
Investment policy for the: the
European Investment Bank
Thematic Fund;
M1C3-23 Investment 4.2: Funds for the
competitiveness of tourism enterprises Milestone
Investment policy for the
National Tourism Fund,
M1C3-24 Investment 4.2 Funds for the
competitiveness of tourism enterprises Milestone
Investment policy for the: SME
Guarantee Fund,
M1C3-25 Investment 4.2: Funds for the
competitiveness of tourism enterprises Milestone
Investment policy for the Fondo
Rotativo
M1C3-26 Investment 4.2: Funds for the
competitiveness of tourism enterprises Milestone
Entry into force of the
implementing decree for the Tax
credit for the redevelopment of
accommodation facilities.
M2C4-7 Reform 3.1: Adoption of national
programs on air pollution control Milestone
Entry into force of a national air
pollution control programme
M2C4-12 Investment 2.1.b. Measures for flood and
hydrogeological risk reduction Milestone
Entry into force of the revised
legal framework for interventions
against flood and hydrogeological
risks
M2C4-18 Investment. 3.1: Protection and
enhancement of urban and peri-urban
forests Milestone
Entry into force of the revised
legal changes for the protection
and valorisation of urban and
peri-urban green areas
M3C1-1 Reform 1.1 - Acceleration of the
approval process of the Contract between Milestone
Entry into force of a legislative
amendment on the approval
446
Sequential
Number Related Measure (Reform or
Investment) Milestone /
Target Name
the MIT and RFI process of the Contratti di
Programma (CdP)
M3C1-2 Reform 1.2 - Acceleration of the
authorization process of projects Milestone
Entry into force of a regulatory
change that reduces the
authorisation time of projects
from 11 to six months
M3C1-21
Reform 2.1 - Implementation of the
recent “Decree Simplification”
(converted into Law n.120 dated 11
September 2020) by issuing a decree
concerning the adoption of “Guidelines
for the classification and management of
risks, the evaluation of security and the
monitoring of existing bridges”
Milestone
Entry into force of “Guidelines
for the classification and
management of risks, the
evaluation of security and the
monitoring of existing bridges”
M3C1-22 Reform 2.2 - Transfer the property of the
bridges and viaducts from the lower level
ranking roads to the higher ranking ones Milestone
Transfer the ownership of the
bridges, viaducts and overpasses
from the lower level ranking
roads to the higher ranking ones
(highways and main national
roads)
M4C1-27 Reform 1.7: Reform of student housing
regulation and investment in student
housing Milestone
Entry into force of legislation to
amend the current rules for
student housing.
M5C3-10
Reform1: Simplification of the
procedures and strengthening of the
Commissioner in the Special Economic
Zones
Milestone
Entry into force of the regulation
to simply the procedures and
strengthen the role of the
Commissioner in the Special
Economic Zones
M5C3-11 Investment 1.4: Infrastructural
investments for the Special Economic
Zone Milestone
Entry into force of Ministry
Decrees approving operational
plans for all eight Special
Economic Zones
M6C2-4 Investment 1.1: Digital update of
hospitals’ technological equipment Milestone
Reorganization plan approved by
Ministry of Health/Italian
Regions
Instalment
Amount EUR 12 643 678 161
447
2.2.Second Instalment (loan support):
Sequential
Number Related Measure (Reform
or Investment) Milestone /
Target Name
M1C2-28 Investment 5.2:
Competitiveness and
resilience of supply chains Milestone
Entry into force of a decree including the
investment policy of the Development Contracts
M2C4-27
Reform 4.1. Simplification
of legislation and
strengthening of governance
for the implementation of
investments in the water
supply infrastructures
Milestone Entry into force of the simplification of legislation
for interventions in primary water infrastructure for
the security of water supply
M5C2-11
Investment 4 - Investments
in projects of urban
regeneration, aimed at
reducing situations of
marginalization and social
degradation
Milestone
Award of all public contracts for investments in
urban regeneration to reduce situations of
marginalisation and social degradation, with
projects in line with the RRF objectives including
the DNSH principle
M5C2-15
Investment 5 - Urban
Integrated Plans -
Overcoming illegal
settlements to fight labour
exploitation in agriculture
Milestone
Entry into force of the Ministerial Decree setting out
the mapping of illegal settlements is adopted by the
“Tavolo di contrasto allo sfruttamento lavorativo in
agricoltura” and the ministerial decree to allocate
resources is adopted
M5C2-19 Investment 6 - Innovation
Programme for Housing
Quality Milestone
Regions and Autonomous Provinces (including
municipalities and/or metropolitan cities located in
those territories) signed the agreements to redevelop
and increase social housing
M1C2-16 Investment 3: Fast internet
connections (Ultra-
Broadband and 5G) Milestone
Award of all public contracts for faster connection
projects
M1C3-12 Investment 2.1 –
Attractiveness of small
historic town Milestone
Entry into force of the Ministry of Culture decree
for the allocation of resources to municipalities for
the attractiveness of Small Historic Towns
M1C3-13 Investment 2.2 – Protection
and enhancement of rural
architecture and landscape Milestone
Entry into force of the Ministry of Culture decree
for the allocation of resources: for the protection
and enhancement of rural architecture and landscape
M1C3-14
Investment 2.3 –
Programmes to enhance the
identity of places, parks and
historic gardens
Milestone
Entry into force of the Ministry of Culture decree
for the allocation of resources: for projects to
enhance the identity of places, parks and historic
gardens
M1C3-15
Investment 2.4 – Seismic
safety of place of places of
worship, restoration of FEC
heritage and shelters for art
works
Milestone
Entry into force of the Ministry of Culture decree
for the allocation of resources: for seismic safety in
place of worship and FEC (Fondo Edifici di Culto)
heritage restoration
M1C3-35 – Investment - 4.3 Caput
Mundi-Next Generation EU
for touristic great events Milestone
Signing of each Agreement for six Projects between
a Ministry of Tourism and
beneficiaries/implementing bodies
M2C1-13 Reform 1.2 - National
Program for Waste
Management Milestone
Entry into force the Ministerial Decree for the
National Program for Waste Management
M2C2-52 Investment 5.2 Hydrogen Milestone Production of electrolysers
448
Sequential
Number Related Measure (Reform
or Investment) Milestone /
Target Name
M4C2-11 Investment 2.1: IPCEI Milestone Entry into force of national legal act allocating the
necessary funding to provide support to project
participants.
M4C2-17
Investment 3.1: Fund for
construction of an integrated
system of research and
innovation infrastructures;
Investment
Milestone Award of contracts for the projects concerning: a)
integrated system of research and innovation
infrastructures
M4C2-18
Invesment1.5: Establishing
and strengthening of
“innovation ecosystems for
sustainability", building
“territorial leaders of R&D”
Milestone Award of contracts for projects concerning
innovation ecosystems;
M4C2-19
Investment 1.4:
Strengthening research
structures and supporting the
creation of “national R&D
leaders” on some Key
Enabling Technologies
Milestone Award of contracts for projects concerning national
R&D leaders on key enabling technologies
M4C2-20 Investment 3.2: Equity
injection into the Digital
Transition Fund (“DTF”) Milestone
The agreement between IT government and the
implementing partner Cassa Depositi e Prestiti
(CDP) establishing the financial instrument signed
M6C1-1
Reform 1: Definition of a
new organisational model
for Territorial healthcare
assistance network
Milestone Entry into force of the secondary legislation
(Ministerial Decree) envisaging the reform of the
organisation of healthcare.
M6C1-2 Investment 1.1: Community
Health Houses to improve
territorial health assistance Milestone Approval of an Institutional Development Contract
M6C1-4 Investment 1.2: Home as the
first place of care and
telemedicine Milestone
Approval of the Guidelines containing the digital
model for the implementation of Home Care
M6C1-5 Investment 1.2: Home as the
first place of care and
telemedicine Milestone
Institutional Development Contract approved by
Ministry of Health and regions
M6C1-10
Investment 1.3:
Strengthening Intermediate
Healthcare and its facilities
(Community Hospitals)
Milestone Approval of an Institutional Development Contract
(Contratto Istituzionale di Sviluppo)
M6C2-5 Investment 1.1: Digital
update of hospitals’
technological equipment Milestone Approval of the Institutional Development Contract
Instalment
Amount EUR 12 643 678 161
2.3. Third Instalment (loan support):
Sequential
Number Related Measure (Reform or
Investment) Milestone
/ Target Name
M2C1-18 Investment 3.1: Green islands Milestone Entry into force of the Directorial
449
Sequential
Number Related Measure (Reform or
Investment) Milestone
/ Target Name
decree
M2C1-20 Investment 3.2: Green Communities Milestone Award of (all) public contracts for the
selection of Green Communities
M5C2-17 Investment 5 - Urban Integrated Plans -
EIB Fund-Of-Fund Milestone
The Fund’s investment strategy is
approved by the Ministry of Finance
(MEF)
M1C1-123
Investment 1.6.3 - Digitization of National
Social Security Institute (INPS) and
National Institute for Insurance against
Accidents at work (INAIL)
Target INPS - "One click by design"
services/contents T1
M1C1-124
Investment 1.6.3 - Digitization of National
Social Security Institute (INPS) and
National Institute for Insurance against
Accidents at work (INAIL)
Target INPS - Employees with improved
Information and Communication
Technologies (ICT) skills T1
M1C3-30 Investment 4.2: Funds for the
competitiveness of tourism enterprises Target
European Investment Bank Thematic
Funds: Disbursement to the Fund of
total of EUR 350 000 000.
M1C3-31 Investment 4.2: Funds for the
competitiveness of tourism enterprises Target
National Tourism Fund: Disbursement
to the Fund of total of
EUR 150 000 000 for equity support.
M2C3-9 Investment 3.1: Promotion of efficient
district heating Milestone
Contracts to improve the heating
networks are awarded by the Ministry
of Ecological Transition following a
public tendering procedure
M2C4-19 Investment. 3.1: Protection and
enhancement of urban and peri-urban
forests Target
Plant trees for the protection and
valorisation of urban and peri-urban
green areas T1
M2C4-24 Investment 3.4. Remediation of “orphan-
sites soil” Milestone
Legal framework for the remediation of
orphan sites
M3C1-3 Investment 1.1 - High-speed railway
connections to the South for passengers
and freight Milestone
Award of the contract (s) to build high-
speed railway in the lines Napoli-Bari,
and Palermo-Catania
M3C1-12 Investment 1.4 - Introducing the European
Rail Transport Management System
(ERTMS) Milestone
Award of the contracts for the European
Rail Transport Management System
M3C2-8 Investment 1.1: Green ports: renewable
energy and energy efficiency interventions
at ports Target Green ports: assignment of works
M4C1-29 Reform 1.7: Reform of student housing
regulation and investment in student
housing Milestone
Entry into force of the reform on
student housing legislation.
M5C2-13 Investment 5 - Urban Integrated Plans -
general projects Milestone
Entry into force of the investment Plan
for urban regeneration projects in
metropolitan areas
M6C2-7 Investment 1.1: Digital update of
hospitals’ technological equipment Milestone Award of all public contracts
Instalment
Amount EUR 9 825 328 389
450
2.4.Fourth Instalment (loan support):
Sequential
Number Related Measure (Reform or
Investment) Milestone /
Target Name
M1C1-125 Investment 1.2 - Cloud enablement
for local PA Milestone
Award of (all) public calls for Cloud
enablement for local Public
Administration tenders
M1C2-22 Investment 4: Satellite Technology
and Space economy Milestone
Award of all public contracts for satellite
technology and space projects
M2C2-48 Investment 3.1 Production of
Hydrogen in brownfield sites
(Hydrogen Valleys) Milestone
Award of all public contract for the
projects the production of hydrogen in
abandoned industrial areas centres
M2C2-50 Investment 3.2 Hydrogen Use in
hard-to-abate industry Milestone
Agreement to promote the transition from
methane to green hydrogen
M5C2-21 Investment 7 - The Sport and Social
Inclusion project Milestone
Award of all public contracts for projects
on sport and social inclusion following a
public call for proposal
M1C3-20 Investment - 3.2 Development of the
film industry (Cinecittà project) Milestone
Signature of the contracts between the
implementing entity Cinecittà SPA and the
companies in relation to the construction
of nine studios
M2C4-21 Investment 3.3 Re-naturification of
Po area Milestone
Revision of the legal framework for
interventions for the re-naturification of
the Po area
M4C1-28 Reform 1.7: Reform of student
housing regulation and investment
in student housing Milestone
Awards of initial contracts for the creation
of additional sleeping accommodation
units (beds)
M4C2-12 Investment 2.1: IPCEI Milestone The list of participants to IPCEI projects is
finalised by 30/06/2023
M4C2-16 Investment 3.1 Research and
innovation infrastructures Target Number of infrastructures funded
M5C1-18 Investment 5 - Creation of women's
enterprises Target
Financial support to enterprises has been
committed
M6C2-14
Investment 2.2: Development of
technical-professional, digital and
managerial skills of professionals in
the healthcare system
Target Scholarships for specific training in
general medical practice are awarded.
Instalment
Amount EUR 16 611 453 220
2.5.Fifth Instalment (loan support):
Sequential
Number Related Measure (Reform or
Investment) Milestone /
Target Name
M2C3-5 Investment 1.1: Construction of
new schools through building
replacement Milestone
Award of all public contracts for the
construction of new schools through building
replacement to upgrade energy in school
buildings, following a public tendering
procedure
451
Sequential
Number Related Measure (Reform or
Investment) Milestone /
Target Name
M2C4-28 Investment 4.1. Investments in
primary water infrastructures
for the security of water supply Milestone
Award of funding to all projects (for
investments in primary water infrastructure and
for the security of water supply
M2C4-30
Investment 4.2. Reduction of
losses in water distribution
networks, including digitization
and monitoring of networks
Milestone
Award of funding to all projects for
interventions in water distribution networks,
including digitization and monitoring of
networks
M1C1-14 Investment 1.6.5: Digitization
of the Council of State Target
Council of State - Court documents available
for analysis in data warehouse T1
M1C1-16 Investment 1.6.5: Digitization
of the Council of State Target
Council of State - Court documents available
for analysis in data warehouse T2
M1C1-126 Investment 1.4.3 - Adoption
scale up of PagoPA platform
services and the “IO” app Target
Adoption scale up of PagoPA platform services
T1
M1C1-127 Investment 1.4.3 - Adoption
scale up of PagoPA platform
services and the “IO” app Target Adoption scale up of “IO” app T1
M1C1-128 Investment 1.4.5 - Digitization
of public notices Target Adoption scale up of digital public notices T1
M1C1-129 Investment 1.6.1 - Digitization
of the Ministry of the Interior Target
Ministry of the Interior - Fully re-engineered
and digitized processes T1
M1C1-130 Investment 1.6.2 - Digitization
of the Ministry of Justice Target Digitized judicial files T1
M1C1-131 Investment 1.6.2 - Digitization
of the Ministry of Justice Milestone Justice Data Lake knowledge systems T1
M1C1-132
Investment 1.6.3 - Digitization
of National Social Security
Institute (INPS) and National
Institute for Insurance against
Accidents at work (INAIL)
Target INPS - “One click by design” services/contents
T2
M1C1-133
Investment 1.6.3 - Digitization
of National Social Security
Institute (INPS) and National
Institute for Insurance against
Accidents at work (INAIL)
Target INPS - Employees with improved Information
and Communication Technologies (ICT) skills
T2
M1C1-134
Investment 1.6.3 - Digitization
of National Social Security
Institute (INPS) and National
Institute for Insurance against
Accidents at work (INAIL)
Target INAIL - Fully re-engineered and digitized
processes/services T1
M1C1-135 Investment 1.6.4 - Digitization
of the Ministry of Defence Target
Ministry of Defence - Digitalisation of
procedures T1
M1C1-136 Investment 1.6.4 - Digitization
of the Ministry of Defence Target
Ministry of Defence - Digitalisation of
certificates T1
M1C1-137 Investment 1.6.4 - Digitization
of the Ministry of Defence Milestone
Ministry of Defence - Commissioning of
institutional web portals and intranet portals
M1C1-138 Investment 1.6.4 - Digitization
of the Ministry of Defence Target
Ministry of Defence - Migration of non-mission
critical applications into Solution for Complete
Information Protection by Infrastructure
Openness (S.C.I.P.I.O.) T1
M1C2-29 Investment 5.2:
Competitiveness and resilience
of supply chains Target Development Contracts approved
452
Sequential
Number Related Measure (Reform or
Investment) Milestone /
Target Name
M2C1-15bis
Reform 1.2 National Program
for Waste Management:
Investment 1.1 -
Implementation of new waste
management plants and
modernization of existing
plants
Target Reduction of irregular landfills (T2)
M2C1-15ter
Reform 1.2 National Program
for Waste Management:
Investment 1.1 -
Implementation of new waste
management plants and
modernization of existing
plants
Target Regional differences in separate collection
M2C1-15
quater
Investment 1.1 -
Implementation of new waste
management plants and
modernization of existing
plants
Milestone Entry into force of Bio-waste separate
collection obligation
M2C2-24 Investment 4.2 Development of
Rapid Mass Transport systems Milestone
Award of all public contracts for the build-up of
metros, tramways, trolleybus and cableway
metropolitan areas
M2C2-32
Investment 4.4.1:
Strengthening of the regional
public transport bus fleet with
zero-emission buses
Milestone Award of all public contracts for the
strengthening of the regional public transport
bus fleet with zero-emission low-floor buses
M2C3-7
Investment 1.2- Construction
of buildings, requalification
and strengthening of real estate
assets of the administration of
justice
Milestone
Award of all public contracts to construct new
buildings, requalify and strengthen real estate
assets of the administration of justice are signed
by the contracting authority following a public
tendering procedure
M2C4-33
Investment 4.3 Investments in
the resilience of the irrigation
agrosystem for better
management of water resources
Milestone Award of funding to all projects for the
resilience of the irrigation agrosystem for the
better management of water resources
M2C4-36 Investment 4.4 Investments in
sewerage and purification Milestone
Award of all public contracts for sewerage and
purification
M3C1-4
Investment 1.1 - High-speed
railway connections to the
South for passengers and
freight
Milestone Award of the contract to build high-speed
railway in the lines Salerno Reggio Calabria
M3C1-17 Investment 1.7 - Upgrading,
electrification and resilience of
railways in the South Target
150 km of works completed related to the
upgrading, electrification and resilience of
railways in the South, ready for the
authorisation and operational phases.
M4C2-5 Investment 1.1: Research
Projects of Significant National
Interest (PRIN) Target Number of research projects awarded
M6C1-8 Investment 1.2: Home as the
first place of care and
telemedicine Target
At least one telemedicine project assigned to
each region (considering both projects that will
be implemented in the individual region and
those that may be developed as part of
consortia among regions)
453
Sequential
Number Related Measure (Reform or
Investment) Milestone /
Target Name
Instalment
Amount EUR 9 030 593 086
2.6.Sixth Instalment (loan support):
Sequential
Number Related Measure (Reform or Investment)
Milestone
/ Target Name
M3C1-10 Investment 1.3 - Diagonal connections Milestone
Award of the contract (s) to build
the connections in the lines Orte-
Falconara and Taranto -
Metaponto-Potenza-Battipaglia
M7-35 Investment 13: Adriatic Line Phase 1 (Sulmona
compressor station and Sestino-Minerbio gas
pipeline) Milestone
Adoption and update of relevant
environmental impact
assessments (VIncA)
M7-40 Investment 15: Transizione 5.0 Milestone Entry into force of the legal act
establishing the criteria of
eligible interventions
M2C1-15 Reform 1.2 National Program for Waste
Management Target
Reduction of irregular landfills
(T1) M2C1-
16bis
Reform 1.2 National Program for Waste
Management Target Irregular landfills
M2C1-22
Investment 3.4: Fondo Contratti di Filiera (FCF)
to support supply-chains contracts for the agri-
food, fishing and aquaculture, forestry,
floriculture and plant nursery sectors
Milestone Implementing Agreement
M2C2-31 Investment 4.4.3: Renewal fleet for the National
fire brigade command Milestone
Award of all public contracts for
the renewal fleet for the National
fire brigade command
M2C4-6 Investment 3.2: Digitization of national parks Target
Administrative simplification
and development of digital
services to visitors to national
parks and marine protected areas
M3C2-10 Reform 2.2: Establishment of a National Digital
Logistics Platform, in order to introduce the
digitalization of freight and/or passenger services Milestone
National Digital Logistics
Platform
M6C2-15 Investment 2.2: Development of technical-
professional, digital and managerial skills of
professionals in the healthcare system Target
Additional scholarships for
specific training in general
medical practice are awarded.
M7-36 Investment 13: Adriatic Line Phase 1 (Sulmona
compressor station and Sestino-Minerbio gas
pipeline) Milestone Award of contracts
M7-38 Investment 14: Cross-border gas export
infrastructure Milestone Award of contracts
Instalment
Amount EUR 7 908 481 227
454
2.7.Seventh Instalment (loan support):
Sequential
Number Related Measure (Reform or
Investment) Milestone
/ Target Name
M1C1-139 Investment 1.2 - Cloud enablement for
local PA Target
Cloud enablement for local Public
Administration T1
M2C2-25 Investment 4.2 Development of Rapid
Mass Transport systems Milestone
Award of all public contracts for the
purchase of zero-emission rolling stock
and interventions for the upgrade of the
infrastructure of rapid mass transport
systems
M2C4-11
Investment 2.1.a. Measures for flood and
hydrogeological risk reduction –
Interventions in Emilia Romagna, Toscana
and Marche
Milestone Identification of the interventions by
ordinance(s) of the Commissioner of
Emergency
M7-46 Investment 17: Financial instrument for
energy renovations of public residential
housing Milestone
Definition of the target of the terms of
reference
M1C1-140 Investment 1.4.1 - Citizen experience -
Improvement of the quality and the
usability of digital public services Target
Improvement of the quality and the
usability of digital public services T1
M1C1-141 Investment 1.6.4 - Digitization of the
Ministry of Defence Target
Digitalisation of procedures of the
Ministry of Defence T2
M1C1-142 Investment 1.6.4 - Digitization of the
Ministry of Defence Target
Digitalisation of certificates of the
Ministry of Defence T2
M1C1-143 Investment 1.6.4 - Digitization of the
Ministry of Defence Target
Ministry of Defence - Migration of
mission critical and non-mission critical
applications into Solution for Complete
Information Protection by Infrastructure
Openness (S.C.I.P.I.O.) T2
M1C2-19 Investment 3: Fast internet connections
(Ultra-Broadband and 5G) Target
Islands provided with ultra-broadband
connectivity
M1C3-27 Investment- 4.3 Caput Mundi-Next
Generation EU for touristic great events Target
Number of cultural and touristic sites
whose requalification reached, on
average, 50% of Stato Avanzamento
Lavori (SAL)(first batch)
M2C1-
16ter
Investment 1.1 - Implementation of new
waste management plants and
modernization of existing plants Target
Regional differences in separate
collection rates
M2C1-25
Investment 3.4: Fondo Contratti di Filiera
(FCF) to support supply-chains contracts
for the agri-food, fishing and aquaculture,
forestry, floriculture and plant nursery
sectors
Milestone Ministry has transferred the overall
amount of resources
M2C2-9 Investment 2.1 Strengthening smart grids Target Smart grids- Increase network capacity
for the distribution of renewable
energies
M2C2-34 Investment 4.4.1: Strengthening of the
regional public transport bus fleet with
zero-emission buses Target
Number of zero-emission low-floor
buses registered T1
M2C2-
34bis
Investment 4.4.2: Strengthening of the
regional public transport railway fleet
with zero emission trains and universal
Target Number of Zero Emission trains
455
Sequential
Number Related Measure (Reform or
Investment) Milestone
/ Target Name
service
M2C2-
38bis
Investment 5.1: Support to the production
system for the Ecological Transition, Net
Zero Technologies, and competitiveness
and resilience of strategic supply chains
Milestone Implementing Agreement
M2C2-39
Investment 5.1. Support to the production
system for the Ecological Transition, Net
Zero Technologies, and competitiveness
and resilience of strategic supply
Milestone The Ministry of Enterprises and Made
in Italy has completed the transfer of
funds to Invitalia S.p.A
M2C2-
42bis
Investment 5.4 – Equity injection into the
Green Transition Fund (“GTF”) Milestone
Equity injection into the Green
Transition Fund
M2C2-44 Investment 1.1 Development of agri-
voltaic systems Milestone
Award of all public contracts for the
installation of photovoltaic solar panels
in agri-voltaic systems
M2C4-22 Investment 3.3 Re-naturification of Po
area Target
Reduction of riverbed artificiality for
the re-naturification of the Po area T1
M2C4-31 Investment 4.2. Reduction of losses in
water distribution networks, including
digitization and monitoring of networks Target
Interventions in water distribution
networks, including digitization and
monitoring of networks T1
M2C4-34 Investment 4.3 Investments in the
resilience of the irrigation agrosystem for
better management of water resources Target
Interventions for the resilience of the
irrigation agrosystem for the better
management of water resources T1
M2C4-35 Investment 4.3 Investments in the
resilience of the irrigation agrosystem for
better management of water resources Target
Interventions for the resilience of the
irrigation agrosystem for the better
management of water resources T1
M3C1-15 Investment 1.5-Strengthening
metropolitan nodes and key national links Target
700 km of upgraded line sections built
on metropolitan nodes and key national
links
M3C1-19 Investment 1.8 - Upgrading railway
stations (RFI management; in South) Target
Upgraded and accessible railway
stations M4C2-
21bis Investment 3.2 – Equity injection into the
Digital Transition Fund (“DTF”) Milestone
Equity injection into the Digital
Transition Fund
M5C3-12
Investment 1.4: Infrastructural
investments for the Special Economic
Zone
Target
Start of works for infrastructural
interventions projects in the Special
Economic Zones
M6C1-7 Investment 1.2: Home as the first place of
care and telemedicine Target
Coordination Centres fully operational
(second batch)
M7-43 Investment 16: Support to SMEs for self-
production from renewable energy
sources Milestone Implementing Agreement
M7-44 Investment 16: Support to SMEs for self-
production from renewable energy
sources Milestone
The Ministry of Enterprises and Made
in Italy has completed the transfer of
funds to Invitalia
M2C4-20 Investment. 3.1: Protection and
enhancement of urban and peri-urban
forests Target
Plant trees for the protection and
valorisation of urban and peri-urban
green areas T2
Instalment
Amount EUR 15 715 972 025
456
2.8.Eighth Instalment (loan support):
Sequential
Number Related Measure (Reform or Investment)
Milestone /
Target Name
M7-47 Investment 17: Financial instrument for
energy renovations of public residential
housing Milestone Implementing Agreement
M7-48 Investment 17: Financial instrument for
energy renovations of public residential
housing Milestone
Ministry has completed the
investment
M1C1-146
Investment 1.4.4 - Adoption scale up of the
National Digital Identity platforms (SPID,
CIE) and the national registry (ANPR)
Target National Digital Identity platform
(CIE)
M1C3-16 Investment – 2.1 Attractiveness of Small
Historic Towns Milestone
Adoption of Decree(s) listing
firms supported in Small Historic
Towns
M2C4-9 Investment 1.1. Implementation of an
advanced and integrated monitoring and
forecasting system Milestone
The monitoring and forecast
system is accessible
M2C4-26 Investment 3.5. Restoration and protection
of the seabed and marine habitats Target
Restoration and protection of
seabed and marine habitats
M4C2-6 Investment 1.1: Research Projects of
Significant National Interest (PRIN) Milestone
Publication of the decree(s)
awarding the projects
M4C2-7 Investment 1.1: Research Projects of
Significant National Interest (PRIN) Target
Number of fixed-term researchers
hired
M4C2-8 Investment 1.3: Partnerships extended to
universities, research centers, companies
and funding of basic research projects Target
Number of research partnerships
signed
M4C2-22 Investment 2.1: IPCEI Target Number of projects supported
M6C1-6 Investment 1.2: Home as the first place of
care and telemedicine Target Home care treatment
Instalment
Amount EUR 11 184 566 013
2.9.Ninth Instalment (loan support):
Sequential
Number Related Measure (Reform or
Investment) Milestone /
Target Name
M1C1-145
Investment 1.4.4 -Adoption scale up of
the National Digital Identity platform
(SPID, CIE) and the national registry
(ANPR)
Target National Digital Identity platform
(CIE) and the national registry
(ANPR)
M1C3-28 Investment 4.2: Funds for the
competitiveness of tourism enterprises Target
Decree(s) awarding the tax credit
and/or the grant and receipts of the
request for disbursement
M1C3-32 Investment 4.2: Funds for the
competitiveness of tourism enterprises Target
Number of enterprises to be
supported through the SME’s
Guarantee Fund
457
Sequential
Number Related Measure (Reform or
Investment) Milestone /
Target Name
M6C2-8 Investment 1.1: Digital update of
hospitals’ technological equipment Target
Hospitals are digitized (DEA -
Emergency and Admission
Departments - Level I and Level II)
M6C2-11
Investment 1.3: Strengthening of the
technological infrastructure and of the
tools for data collection, data processing,
data analysis and simulation
Target General practitioners feeding the
Electronic Health Record.
M1C3-33 Investment 4.2 Funds for the
competitiveness of tourism enterprises Target
Fondo Rotativo: Legal agreement
signed with final beneficiaries
M1C3-9bis Investment 4.1 Digital Tourism Hub Target
Registration of enterprises, including
individual operators, in the Digital
Tourism Hub and access to the
services provided by the Hub and
accessibility of services in the Digital
Tourism Hub
M1C3-18
Investment 2.3 Programmes to preserve
and refurbish historical parks and
gardens
Target Number of historical parks and
gardens refurbished
M2C1-23
Investment 3.4: Fondo Contratti di
Filiera (FCF) to support supply-chains
contracts for the agri-food, fishing and
aquaculture, forestry, floriculture and
plant nursery sectors
Milestone Resources transferred to ISMEA and
amendment of the implementing
agreement
M4C1-31 Investment 5: Student housing fund Milestone Implementing Agreement
M5C1-
19bis
Investment 5 - Creation of women's
enterprises Milestone
Implementing Agreement and
transfer to Invitalia
M1C2-30 Investment 7 – National Connectivity
Fund Milestone Implementing Agreement
M2C1-26 Investment 4: Agri-Solar Park Facility Milestone Implementing Agreement
M5C2-18 Investment 5 - Urban Integrated Plans -
EIB Fund-Of-Fund Target
Legal agreements signed with final
beneficiaries for an investment value
of underlying projects of at least
EUR 545 000 000
Instalment
Amount EUR 7 118 464 154
2.10. Tenth Instalment (loan support):
Sequential
Number Related Measure (Reform or
Investment) Milestone
/ Target Name
M1C1-26 Investment 1.1: Digital infrastructure Target
Migration to the Polo Strategico
Nazionale or to a secure, certified
public cloud environment
M2C3-6 Investment 1.1: Construction of new
schools through building replacement Target Construction of new schools
M2C3-8 Investment 1.2- Requalification of
public real estate assets partly or wholly
used by the administration of justice
Target Works for at least 289 000 square
meters of public real estate assets
carried out
M2C3-10 Investment 3.1: Promotion of efficient Target Build or extension of networks for
458
Sequential
Number Related Measure (Reform or
Investment) Milestone
/ Target Name
district heating district heating to reduce energy
consumption
M2C4-23 Investment 3.3 Re-naturification of Po
area Target
Reduction of riverbed artificiality for
the re-naturification of the Po area T2
M2C4-25 Investment 3.4. Remediation of
“orphan-sites soil” Target Revitalisation of orphan sites
M2C4-29 Investment 4.1. Investments in primary
water infrastructures for the security of
water supply Target
Administrative certificates for
interventions in water systems
M2C4-38 Investment 4.4 Investments in sewerage
and purification Target
Interventions for sewerage and urban
waste-water treatment
M5C2-20 Investment 6 - Innovation Programme
for Housing Quality Target
Number of housing units built,
purchased or renovated
M1C2-15 Investment 2: Innovation and
technology of microelectronics Milestone
Production capacity of Silicon Carbide
substrates
M1C2-17 Investment 3: Fast internet connections
(Ultra-Broadband and 5G) Target
House numbers enabled with 1 Gbps
connectivity
M1C2-18 Investment 3: Fast internet connections
(Ultra-Broadband and 5G) Target
School premises and healthcare
facilities provided with 1 Gbps
connectivity
M1C2-20 Investment 3: Fast internet connections
(Ultra-Broadband and 5G) Target
Extra-urban roads and TEN-T corridors
enabled with 5G coverage
M1C2-21 Investment 3: Fast internet connections
(Ultra-Broadband and 5G) Target
Market failure areas enabled or
provided with 5G coverage
M1C3-21 Investment - 3.2 Development of the
film industry (Cinecittà project) Target
Construction and/or renovation of
studios and delivery of services for the
Centre for
Experimental Cinematography
M1C3-36 –Investment - 4.3 Caput Mundi-Next
Generation EU for touristic great events Target
Certificates of completion of works or
services
M2C1-16 Reform 1.2
National Program for Waste
Management Target Irregular landfills
M2C1-19 Investment 3.1: Green islands Target Administrative act(s) for interventions
in small islands
M2C1-21 Investment 3.2: Green Communities Target Administrative certificates on the
finalisation of projects in the Green
Communities
M2C1-24
Investment 3.4: Fondo Contratti di
Filiera (FCF) to support supply-chains
contracts for the agri-food, fishing and
aquaculture, forestry, floriculture and
plant nursery sectors
Target Legal agreements with final
beneficiaries
M2C2-5 Investment 1.4 Development of
biomethane, according to criteria for
promoting the circular economy Milestone
Implementing agreement, legal
agreements signed with final
beneficiaries and investment
completion
M2C2-17 Investment 3.4 Hydrogen testing for
railway mobility and road transport Target
Number of hydrogen refuelling stations
built
M2C2-19 Investment 3.5 Hydrogen Research and
Development Target
Number of projects for research and
development on hydrogen
459
Sequential
Number Related Measure (Reform or
Investment) Milestone
/ Target Name
M2C2-26 Investment 4.2 Development of Rapid
Mass Transport systems Milestone
Public infrastructure and rolling stock
for rapid mass transport
M2C2-35
bis
Investment 4.4.2: Strengthening of the
regional public transport railway fleet
with zero emission trains and universal
service
Target Number of trains procured
M2C2-40
Investment 5.1. Support to the
production system for the Ecological
Transition, Net Zero Technologies, and
competitiveness and resilience of
strategic supply chains
Target
Amendment implementing agreement,
award decision for final beneficiaries
and investment completion
M2C2-43 Investment 5.4 – Equity injection into
the Green Transition Fund (“GTF”) Milestone Adoption of a report
M2C2-47 Investment 1.2 Promotion of RES for
energy communities and jointly acting
renewables self-consumers Milestone
Implementing agreement, legal
agreements signed with final
beneficiaries and investment
completion
M2C2-49 Investment 3.1 Production of Hydrogen
in brownfield sites (Hydrogen Valleys) Target Electrolysers installed
M2C2-53 Investment 5.2 Hydrogen Target Industrial plant(s) built
M2C4-6bis Investment 3.2: Digitization of national
parks Milestone
Interventions related to nature
coservation and monitoring activities
M2C4-11bis
Investment 2.1.a. Measures for flood
and hydrogeological risk reduction –
Interventions in Emilia Romagna,
Toscana and Marche
Target Interventions carried out
M2C4-13 Investment 2.1b- Measures for flood
and hydrogeological risk reduction Target
Type D and type E interventions
carried out
M2C4-34bis
Investment 4.3 Investments in the
resilience of the irrigation agrosystem
for better management of water
resources
Target Interventions for the resilience of the
irrigation agrosystem for the better
management of water resources T1.2
M3C2-5bis Investment 2.1- Digitalisation of the
logistic chain Target Digitalisation of the logistic chain
M3C2-6 Investment 2.2: Digitalization of air
traffic management Milestone Digitalisation of air traffic management
M3C1-6 Investment 1.1 - High-speed railway
lines in the Centre and South Target
High-speed rail in the lines Napoli-
Bari, Salerno-Reggio Calabria,
Palermo-Catania, Orte-Falconara,
Taranto-Metaponto-Potenza-
Battipaglia.
M3C1-9 Investment 1.2 - High-speed lines in the
North Target
High-speed rail in the lines Brescia-
Verona-Vicenza-Padova; Liguria-Alpi.
M3C1-14 Investment 1.4 - Introducing the
European Rail Transport Management
System (ERTMS) Target
2 785km of railways equipped with the
European Rail Transport Management
System at an infrastructural and/or
technological level.
M3C1-20 Investment 1.8 - Upgrading railway
stations Target Upgraded railway stations
M3C1-26 Reform 1.3 – Boosting the efficiency of Milestone Entry into force of legal act(s)
460
Sequential
Number Related Measure (Reform or
Investment) Milestone
/ Target Name
railway infrastructure in Italy
M4C1-30 Reform 1.7: Reform of student housing
regulation and investment in student
housing Target
Student sleeping accommodation units
created
M4C2-9 Investment 1.4: Creation of “national
R&D leaders” on some Key Enabling
Technologies Target
National Centres for which an activity
report has been issued
M4C2-14 Investment 2.3: Technology transfer
centres Target
Disbursement of financial value of
EUR 309 000 000.
M4C2-16
bis Investment 3.1: Research and
innovation infrastructures Target
Research and innovation infrastructures
for which an activity report has been
issued
M4C2-18
bis
Invesment 1.5: “Innovation ecosystems
for sustainability", building “territorial
leaders of R&D” Target
Innovation ecosystems for which an
activity report has been issued
M4C2-21 Investment 3.2 Equity injection into the
Digital Transition Fund (“DTF”) Milestone Adoption of a report
M5C2-12
Investment 4 - Investments in projects
of urban regeneration, aimed at
reducing situations of marginalization
and social degradation
Target Projects carried out
M5C2-14 Investment 5 - Urban Integrated Plans -
general projects Target Projects carried out
M5C2-16
Investment 5 - Urban Integrated Plans -
Overcoming illegal settlements to fight
labour exploitation in agriculture
Target Projects on housing and set-up of
Platform
M5C2-22 Investment 7 - Sport and Social
Inclusion Target
Administrative certificates for
interventions related to the construction
or renovation of sport facilities
M5C3-4 Investment 1.1.2: Territorial proximity
health facilities Milestone
Support to rural pharmacies in
municipalities, hamlets or settlements
of less than 5 000 inhabitants (second
batch)
M5C3-13 Investment 1.4: Infrastructural
investments for the Special Economic
Zone Target
Finalisation of infrastructural projects
in the Special Economic Zone
M6C1-3 Investment 1.1: Community Health
Houses to improve territorial health
assistance Target
Community Health Houses’ services
are activated
M6C1-9 Investment 1.2: Home as the first place
of care and telemedicine Target Assistance by telemedicine tools
M6C1-11 Investment 1.3: Strengthening
Intermediate Healthcare and its
facilities (Community Hospitals) Target
Community Hospitals’ services are
activated
M6C2-6 Investment 1.1: Digital update of
hospitals’ technological equipment Target
Proof of delivery or testing for 3 100
items of diagnostic equipment
M6C2-9 Investment 1.1: Digital update of
hospitals’ technological equipment Target
Beds provided or converted in ICUs
and semi-intensive care
M6C2-10 Investment 1.2: Toward a safe and
sustainable hospital Target
Anti-seismic interventions in hospitals
facilities are completed
461
Sequential
Number Related Measure (Reform or
Investment) Milestone
/ Target Name
M6C2-10
bis Investment 1.2: Toward a safe and
sustainable hospital Target
Payment(s) for interventions under Art.
20 of Law 67/88
M6C2-12
Investment 1.3: Strengthening of the
technological infrastructure and of the
tools for data collection, data
processing, data analysis and simulation
Milestone
Testing of the components of the
Health Insurance card system, of the
infrastructure for the interoperability of
the Electronic Health Record, and of
the “Ecosistema Dati Sanitari”.
M6C2-13
Investment 1.3: Strengthening of the
technological infrastructure and of the
tools for data collection, data
processing, data analysis and simulation
Target The Electronic Health Record is being
used for the majority of health records
M7-37 Investment 13: Adriatic Line Phase 1
(Sulmona compressor station and
Sestino-Minerbio gas pipeline) Milestone
Works on the Sulmona compression
station and Sestino Minerbio gas
pipelines carried out
M7-39 Investment 14: Cross-border gas export
infrastructure Milestone
Works on the Poggio Renatico
compression station carried out
M7-41 Investment 15: Transizione 5.0 Target Tax credits granted to firms based on
documents presented in 2024-2025
M7-45 Investment 16: Support to SMEs for
self-production from renewable energy
sources Target
Legal agreements with final
beneficiaries
M7-49 Investment 17: Financial instrument for
energy renovations of public residential
housing Target
Legal agreements signed with final
beneficiaries
M1C3-29 Investment 4.2: Funds for the
competitiveness of tourism enterprises Target
Number of projects to be supported
through the European Investment Bank
Thematic Funds
M3C2-9 Investment 1.1: Green ports: renewable
energy and energy efficiency
interventions at ports Target Delivery of goods, works and services
M1C2-23bis Investment 4: Satellite Technology and
Space economy Milestone Satellite technology and space projects
M1C3-16bis Investment-2.1: Attractiveness of Small
Historic Towns Target Interventions carried out
M1C3-17
Investment – 2.2 Protection and
enhancement of rural architecture and
landscape
Target Interventions carried out
M1C3-19
Investment - 2.4 Seismic safety of
places of worship, restoration of FEC
(Fondo Edifici di Culto) heritage and
shelters for art works (Recovery Art)
Target Interventions carried out
M2C1-10
Investment 2.1: Logistics plan for the
agri-food, fishing and aquaculture,
forestry, floriculture and plant nursery
sectors
Target
Tangible and intangible investments in
agri-food, fishing and aquaculture,
forestry, floriculture and plant nursery
sectors.
M2C1-
16quater
Investment 1.1 – Implementation of
new waste management plants and
modernization of existing plants and
circular economy “flagship” projects
Target Project carried out
462
Sequential
Number Related Measure (Reform or
Investment) Milestone
/ Target Name
M2C2-45 Investment 1.1: Development of agri-
voltaic systems Milestone
Implementing agreement, legal
agreements signed with final
beneficiaries and investment
completion
M4C1-18
Investment 1.1: Plan for nurseries and
preschools and early childhood
education and care services
Target Places for early childhood education
and care for children aged 0-6.
M4C1-21 Investment 1.2: Plan for the extension
of full-time Target
Construction and/or renovation of
canteen in schools
M4C1-26
Investment 3.3: School building
security and structural rehabilitation
plan
Target Interventions enhancing the safety
and/or energy efficiency
M4C1-32 Investment 5: Student housing fund Milestone
Legal agreements signed with final
beneficiaries and investment
completion
M5C1-20 Investment 5 - Creation of women’s
enterprises Target
Transfer to Invitalia and legal
agreements signed with final
beneficiaries
M5C2-6
Investment 1 - Supporting vulnerable
people and preventing
institutionalization
Target Actions to support vulnerable people
finalised in social districts
M5C2-8 Investment 2 - Autonomy patterns for
people with disabilities Target
Beneficiaries have been provided
access to housing and/or ICT devices
accompanied by training on digital
skills
M5C2-10 Investment 3 - Housing First and Post
Stations Target
People living in severely material
deprivation taken in charge by projects
on Housing First for at least six months
and Post stations
M1C2-31 Investment 7 – National Connectivity
Fund Milestone
Legal agreements signed with final
beneficiaries and investment
completion
M1C2-32 Investment 8 – InvestEU Member State
Compartment Milestone
Signature of the Contribution
Agreement between the Government of
Italy and the European Commission
M1C2-33 Investment 8 – InvestEU Member State
Compartment Target
Financing or investment operations
approved by the InvestEU Investment
Committee
M3C1-28
Investment 1.10 - Strengthening
metropolitan nodes, interregional and
regional railway lines
Target 3 309 km of upgraded line sections
built
M2C4-40 Investment 4.5 – Grant scheme for
investments on water infrastructures Target
Legal agreements signed with final
beneficiaries and completion of the
investment.
M1C2-34 Investment 9 – Transition 4.0 – scale-up Target
Transition 4.0 tax credits granted to
firms based on documents presented in
2021-2026
M2C1-27 Investment 4: Agri-Solar Park Facility Milestone
Legal agreements signed with final
beneficiaries and investment
completion
M2C4-39 Investment 4.5 – Grant scheme for Milestone Entry into force of the Implementing
463
Sequential
Number Related Measure (Reform or
Investment) Milestone
/ Target Name
investment on water infrastructure Agreement
M2C2-54 Investment 4.6 - Diagnostic trains Target Diagnostic trains
Instalment
Amount EUR 19 919 595 964
464
SECTION 3: ADDITIONAL ARRANGEMENTS
1. Arrangements for monitoring and implementation of the recovery and resilience plan
The monitoring and implementation of the recovery and resilience plan of Italy shall take place in
accordance with the following arrangements.
As provided under Decree-Law No. 77 of 31 May 2021 as amended by Decree-Law No. 13 of 24
February 2023, a number of coordinating structures are created for the monitoring and
implementation of the plan. These include in particular: (i) a high-level steering committee (“cabina di
regia”) established at the Presidency of the Council of Ministers, with the main task to steer and
coordinate the implementation of the plan; (ii) a mission structure established at the Presidency of the
Council of Ministers, at least for the duration of the plan, empowered to act as a central coordination
structure for the implementation and monitoring of the plan; (iii) a technical structure at the Ministry
of Economy and Finance, performing the operational monitoring of the implementation of plan, the
control of the regularity of procedures and expenses and the reporting, and the technical and
operational support to the implementation phase. The mission structure at the Presidency of the
Council of Ministers acts as a single point of contact at national level for the European Commission.
The Ministry of Economy and Finance ensures the evaluation of the results of the plan. Social
partners and other stakeholders participate to dedicated meetings of “cabina di regia” to ensure their
involvement in the implementation of the plan. Moreover, coordination structures are identified at the
level of each central administration responsible for measures included in the plan, tasked with the
management, monitoring, reporting and control on the relevant interventions, including in relation to
the supervision of implementation and progress towards the achievement of milestones and targets.
Finally, enforcement mechanisms in case of implementation issues, including through the activation
of substitution powers vis-à-vis the administrations responsible for the measures of the plan, are
envisaged with the aim to guarantee a timely and effective delivery of projects and ex-ante
mechanisms for the resolution of conflicts are put in place.
In order to strengthen administrative capacity for the monitoring and implementation, the recruitment
of temporary personnel is envisaged, including in relation to central administrations responsible for
plan’s interventions and the Ministry of Economy and Finance (including concerning the central
coordinating structure and the State Accounting Department), as provided under Decree Law of 9
June 2021, n. 80, as well as in relation to administrations of the South of Italy, which are expected to
reinforce human capital involved in the planning and spending of EU funds, as provided in particular
under Law n. 178 of 2020. In addition, resources are allocated to the mission structure established at
the Presidency of the Council of Ministers to ensure its effective functioning, as provided under
Decree-Law No. 13 of 24 February 2023. Finally, technical and operational support to central and
local administrations is envisaged in the implementation of projects, including through the use of
public capital companies, a pool of experts for technical assistance, and the possibility to resort to
external expertise. These actions shall be accompanied by the implementation of measures to cut red
tape and simplify administrative procedures, as provided for under Decree Law No. 77 of
31 May 2021 and Decree-Law No. 13 of 24 February 2023.
The arrangements also provide for the use of an integrated IT system (“ReGiS”). The existing audit
service Inspectorate General for Financial Relations with the European Union (IGRUE), within the
Ministry of Economy and Finance, is tasked with the coordination of the audit systems and
conducting the controls with the support of the State Territorial Accounts Office (RTS). Enhanced
arrangements with Guardia di Finanza and relevant independent authorities such as the national anti-
corruption agency ANAC shall remain in place, thus reinforcing the role that the Italian legal system
already attributes to these authorities in relation to the protection of public finances, including those
from the EU.
465
2. Arrangements for providing full access by the Commission to the underlying data
In order to provide full access to the Commission to the underlying relevant data, Italy shall have in
place the following arrangements.
The Ministry of Economy and Finance acts as a technical structure for monitoring, including on
progress on milestones and targets, and, where appropriate, implementing control and audit activities,
and for providing reporting and requests for payments. It coordinates the reporting of milestones and
targets, relevant indicators, but also qualitative financial information and other data, such as on final
recipients. The data encoding is taking place at the level of the central administrations responsible for
the plan’s measures, which shall report the required data to the Ministry of Economy and Finance. In
accordance with Article 24(2) of Regulation (EU) 2021/241, upon completion of the relevant agreed
milestones and targets in Section 2.1 of this Annex, Italy shall submit to the Commission a duly
justified request for payment of the financial contribution and, where relevant, of the loan. Italy shall
ensure that, upon request, the Commission has full access to the underlying relevant data that supports
the due justification of the request for payment, both for the assessment of the request for payment in
accordance with Article 24(3) of Regulation (EU) 2021/241 and for audit and control purposes.
EN EN
EUROPEAN COMMISSION
Brussels, 7.8.2026 SWD(2026) 266 final
COMMISSION STAFF WORKING DOCUMENT
Updated Climate tracking and digital tagging of the recovery and resilience plan of Italy
Accompanying the document
Proposal for a COUNCIL IMPLEMENTING DECISION
amending the Implementing Decision of 13 July 2021 on the approval of the assessment
of the recovery and resilience plan for Italy
{COM(2026) 434 final}
1
Updated Climate tracking and digital tagging of the recovery and resilience plan of Italy
The table below presents the detailed application of the climate tracking and digital tagging
methodologies set out respectively in Annexes VI and VII to Regulation (EU) 2021/241 in the
modified Italian recovery and resilience plan.
Int. Field = intervention field.
Coeff. = Coefficient for the calculation of support to climate change objectives and to digital
transition, on the basis of Annex VI and Annex VII of the RRF Regulation.
New or revised measures are marked in yellow to distinguish them from the unchanged
measures in the RRP.
Climate Digital
Measure/Sub-
Measure ID Measure/Sub-Measure Name
Budget
(EUR m)
Int.
Field
Coeff.
% Int. Field
Coeff.
%
M1C1.I1.1 Digital infrastructure 900.0 - 055 100%
M1C1.I1.2 Cloud enablement for local PA 1 000.0 - 011 100%
M1C1.I1.3.1 National Digital Data Platform 556.0 - 011 100%
M1C1.I1.3.2 Single Digital Gateway 90.0 - 011 100%
M1C1.I1.4.1
Citizen experience - Improvement
of the quality and the usability of
digital public services
813.0 - 011 100%
M1C1.I1.4.2
Citizen inclusion - Accessibility
improvement of digital public
services
80.0 - 011 100%
M1C1.I1.4.3
Adoption scale up of PagoPA
platform services and the “IO” app ;
1.4.5 - Digitization of public
notices
361.7 - 011 100%
M1C1.I1.4.4
Adoption scale up of the National
Digital Identity platforms (SPID,
CIE) and the national registry
(ANPR)
285.0 - 011ter 100%
M1C1.I1.4.5 Digitization of public notices 245.0 - 011 100%
M1C1.I1.4.6 Mobility as a Service for Italy 40.0 - 011 100%
M1C1.I1.5 Cybersecurity 623.0 - 021quinquies 100%
M1C1.I1.6.1 Digitization of the Ministry of the
Interior 107.0 - 011 100%
M1C1.I1.6.2 Digitization of the Ministry of
Justice 133.2 - 011quater 100%
M1C1.I1.6.3
Digitization of National Social
Security Institute (INPS) and
National Institute for Insurance
against Accidents at work (INAIL)
296.0 - 011 100%
M1C1.I1.6.4 Digitization of the Ministry of
Defence 42.5 - 011 100%
M1C1.I1.6.5 Digitization of the Council of State 7.5 - 011 100%
M1C1.I1.6.6 Digitization of the Finance Police 25.0 - 011 100%
M1C1.I1.7.1 Digital Civic Service 60.0 - 108 100%
M1C1.I1.7.2 Network of digital facilitation
services 135.0 - 108 100%
2
Climate Digital
Measure/Sub-
Measure ID Measure/Sub-Measure Name
Budget
(EUR m)
Int.
Field
Coeff.
% Int. Field
Coeff.
%
M1C1.R1.2 Transformation support 155.0 - 011 100%
M1C1.I1.8.1a
Hiring of human capital to
strengthen the Judicial Office and
overcome the disparities between
the different judicial offices_digital
part
907.2 - 011quater 100%
M1C2.I1.1
Transition 4.0 - Tax credit for
tangible 4.0 capital goods (Annex
A)
8 868.0 - 010 100%
M1C2.I1.2
Transition 4.0 - Tax credit for
intangible 4.0 capital goods (Annex
B)
1 913.9 - 010 100%
M1C2.I1.5 Tax credit for training activities 300.0 - 108 100%
M1C2.I2 Innovation and technology of
microelectronics 292.5 - 021quater 100%
M1C2.I3.1 Plan Italia 1 Gbps 2 985.4 - 051 100%
M1C2.I3.2 Italia 5G 1 115.8 - 051 100%
M1C2.I3.3 Connected Schools 261.0 - 051 100%
M1C2.I3.4 Connected Health care facilities 335.2 - 051 100%
M1C2.I3.5 Connected smaller islands 60.5 - 051 100%
M1C2.I4.1 SatCom Initiative 210.0 - 055bis 100%
M1C2.I4.2 Earth Observation 797.0 - 055bis 100%
M1C2.I4.3 Space Factory 180.0 - 009bis 100%
M1C2.I4.4 In-Orbit Economy 300.0 - 009bis 100%
M1C2.I5.1 Refinancing and remodelling of
Fund 394/81 managed by SIMEST 1 200.0 - 015 40%
M1C2.I5.2 Competitiveness and resilience of
supply chains 750.0 - 015 40%
M1C2.I7 National Connectivity Fund 733.4 051 100%
M1C2.I9.1
Scale-up measure: Transition 4.0 -
Tax credit for tangible 4.0 capital
goods (Annex A)
3 500.0 010 100%
M1C2.I9.2
Scale-up measure: Transition 4.0 -
Tax credit for intangible 4.0 capital
goods (Annex b)
30.0 010 100%
M1C3.I1.1 Digital Strategy and Platforms for
Cultural Heritage 500.0 - 011 100%
M1C3.I1.3.a
Improve energy efficiency in
cinema, theatres and
museums_energy efficiency
210.0 026 40% -
M1C3.I2.1.a
Attractiveness of small historic
towns_energy efficiency of public
buildings
560.0 026 40% -
M1C3.I2.1.b Attractiveness of small historic
towns_energy efficiency of SMEs 100.0 024 40% -
M1C3.I2.3 Programs to enhance the identity of
places: parks and historic gardens 300.0 050 40% -
M1C3.I3.2.a
Development of the film industry
(Cinecittà project)_digital
component
61.0 - 011 100%
3
Climate Digital
Measure/Sub-
Measure ID Measure/Sub-Measure Name
Budget
(EUR m)
Int.
Field
Coeff.
% Int. Field
Coeff.
%
M1C3.I3.2.b
Development of the film industry
(Cinecittà project)_construction of
energy efficient studios
95.2 025ter 40% -
M1C3.I3.2.c
Development of the film industry
(Cinecittà project)_energy
efficiency renovations
64.9 026 40% -
M1C3.I3.3
Capacity building for culture
operators to manage the digital and
green transition.
155.0 - 021bis 100%
M1C3.I4.1 Digital Tourism Hub 114.0 - 011bis 100%
M1C3.I4.2.a
Funds for the competitiveness of
tourism enterprise_energy
efficiency
509.0 025 40% -
M2C1.I1.1
Implementation of new waste
management plants and
modernization of existing plants
1 764.0 042 40% -
M2C1.I2.1.a
Logistics plan for the agri-food,
fishing and aquaculture, forestry,
floriculture and plant nursery
sectors_innovative technologies in
agro-industrial production
220.8 047 40% -
M2C1.I2.1.b
Logistics plan for the agri-food,
fishing and aquaculture, forestry,
floriculture and plant nursery
sectors_digital solutions for
logistics
149.0 - 010 100%
M2C1.I2.1.c
Logistics plan for the agri-food,
fishing and aquaculture, forestry,
floriculture and plant nursery
sectors_zero emission transport
solutions
127.0 079 40% -
M2C1.I2.1.d
Logistics plan for the agri-food,
fishing and aquaculture, forestry,
floriculture and plant nursery
sectors_reduction of waste
27.6 047 40% -
M2C1.I2.1.e
Logistics plan for the agri-food,
fishing and aquaculture, forestry,
floriculture and plant nursery
sectors_renewable energy
27.6 029 100% -
M2C1.I3.4.b
Fondo Rotativo Contratti di Filiera
(FCF) to support supply-chains
contracts for the agri-food, fishing
and aquaculture, forestry,
floriculture and plant nursery
sectors_SMEs
3 120.0 047 40% -
M2C1.I3.4.c
Fondo Rotativo Contratti di Filiera
(FCF) to support supply-chains
contracts for the agri-food, fishing
and aquaculture, forestry,
floriculture and plant nursery
sectors_solar
200.0 029 100% -
M2C1.I3.4.d
Fondo Rotativo Contratti di Filiera
(FCF) to support supply-chains
contracts for the agri-food, fishing
and aquaculture, forestry,
200.0 - 010 100%
4
Climate Digital
Measure/Sub-
Measure ID Measure/Sub-Measure Name
Budget
(EUR m)
Int.
Field
Coeff.
% Int. Field
Coeff.
%
floriculture and plant nursery
sectors_digitisation
M2C1.I3.4.e
Fondo Rotativo Contratti di Filiera
(FCF) to support supply-chains
contracts for the agri-food, fishing
and aquaculture, forestry,
floriculture and plant nursery
sectors_R&D climate change
400.0 022 100% -
M2C1.I2.2.a Agri-solar Park_solar panels 1 482.6 029 100% -
M2C1.I2.2.b Agri-solar Park_energy efficient
renovations 518.6 024 40% -
M2C1.I2.2.c Agri-solar Park_energy efficient
cooling systems 222.3 024 40% -
M2C1.I2.3.b
Innovation and mechanization in
the agricultural and food sectors_oil
sector
100.0 047 40% -
M2C1.I3.1.a Green islands_energy efficiency 34.0 026 40% -
M2C1.I3.1.b Green islands_zero emission 6.0 072bis 100% -
M2C1.I3.1.c Green islands_waste management 10.0 042 40% -
M2C1.I3.1.d Green islands_solar energy 50.0 029 100% -
M2C1.I3.3
Culture and awareness on
environmental topics and
challenges
30.0 027 100% 021bis 100%
M2C1.I4.a Agri-solar Park Facility_solar panel 540.0 029 100%
M2C1.I4.b
Agri-solar Park Facility_energy
efficient renovations/cooling
systems
233.0 024 40%
M2C2.I1.1 Development of agri-voltaic
systems 999.0 029 100% -
M2C2.I1.2
Promotion of renewable energy
sources for energy communities and
jointly acting renewables self-
consumers
1 041.5 029 100% -
M2C2.I1.4.1
Development of biomethane,
according to criteria for promoting
the circular economy_renewable
energy
2 236.0 030bis 100% -
M2C2.I2.1 Strengthening smart grids 3 610.0 033 100% 033 40%
M2C2.I2.2 Interventions to increase the
resilience of power grid 500.0 037 100% -
M2C2.I3.1.a
Production of Hydrogen in
brownfield sites (Hydrogen
Valleys)_production
350.0 032 100% -
M2C2.I3.1.b
Production of Hydrogen in
brownfield sites (Hydrogen
Valleys)_R&D
150.0 022 100% -
M2C2.I3.4 Hydrogen testing for railway
mobility and road transport 345.4 077 100% -
M2C2.I3.5.a Hydrogen Research and
Development 160.0 022 100% -
M2C2.I3.5.b Hydrogen Research and
Development 140.0 022 100% -
5
Climate Digital
Measure/Sub-
Measure ID Measure/Sub-Measure Name
Budget
(EUR m)
Int.
Field
Coeff.
% Int. Field
Coeff.
%
M2C2.I4.1 Investment in soft mobility
(National Plan of Cycle Path) 449.6 075 100% -
M2C2.I4.2
Development of Rapid Mass
Transport systems (metro, streetcar,
bus rapid transit)_infrastructure
3 046.0 073 100% -
M2C2.I4.2
Development of Rapid Mass
Transport systems (metro, streetcar,
bus rapid transit)_rolling stock
275.0 074 100% -
M2C2.I4.3 Installation of charging
infrastructures 86.0 077 100% -
M2C2.I4.4.1.a
Renewal of the regional public
transport bus fleet with clean fuels
vehicles_rolling stock
1 650.0 074 100% -
M2C2.I4.4.1.b
Renewal of the regional public
transport bus fleet with clean fuels
vehicles_infrastructure
765.0 073 100% -
M2C2.I4.4.2
Renewal of the regional public
transport railway fleet with clean
fuels trains and universal service
963.5 072bis 100% -
M2C2.I4.4.3.a Renewal fleet for the National fire
brigade command_vehicles 122.5 n.a.1 100% -
M2C2.I4.4.3.b Renewal fleet for the National fire
brigade command_recharging 17.5 077 100% -
M2C2.I4.5
Private and light commercial
vehiclefleet renewal program with
electric vehicles
457.3 n.a.1 100% -
M2C2.I4.6 Diagnostic trains 89.5 072bis 100% -
M2C2.I5.1.1a Net Zero Technologies_supply
chain 600.0 027 100% -
M2C2.I5.1.1b Net Zero Technologies_energy
efficiency 150.0 024 40% -
M2C2.I5.2 Hydrogen 259.9 022 100% -
M2C2.I5.4a
Equity injection into the Green
Transition Fund (“GTF”)
managed by CDP Venture
Capital SGR_climate change
237.5 022 100% -
M2C2.I5.4b
Equity injection into the Green
Transition Fund (“GTF”)
managed by CDP Venture
Capital SGR_recycling
6.3 045bis 100% -
M2C2.I5.4c
Equity injection into the Green
Transition Fund (“GTF”)
managed by CDP Venture
Capital SGR_wind
6.2 028 100% -
1 The ‘Methodology for climate tracking’ annexed to the Recovery and Resilience Facility Regulation does not set out
intervention fields that would allow for climate or environmental tracking of electric vehicles or plug-in hybrid vehicles, except
for vehicles for urban transport falling under intervention field 074. According to Article 18(4)(e) of the Regulation, the
methodology should however ‘be used accordingly for measures that cannot be directly assigned to an intervention field listed
in Annex VI’. In this context, the Commission has applied a 100% climate contribution coefficient for zero-emission vehicles
of all categories (this includes battery electric and fuel cell/hydrogen-powered vehicles); a 40% climate contribution coefficient
for plug-in hybrid light-duty vehicles; and, in line with the criteria under the Taxonomy Regulation, a 100% climate coefficient
for low-emission heavy-duty vehicles.
6
Climate Digital
Measure/Sub-
Measure ID Measure/Sub-Measure Name
Budget
(EUR m)
Int.
Field
Coeff.
% Int. Field
Coeff.
%
M2C2.I5.5 Green Tax Credit 721 024 40%
M2C3.I1.1 Construction of new schools
through building replacement 1 006.0 025ter 40% -
M2C3.I1.2.a
Construction of buildings,
requalification and strengthening of
real estate assets of the
administration of justice_energy
efficiency
113.8 026 40% -
M2C3.I2.1.a
Strengthening of the Ecobonus and
Sismabonus for energy efficiency
and building safety_energy
efficiency
1 3950.0 025bis 100% -
M2C3.I3.1 Promotion of efficient district
heating 118.0 034bis0 100% -
M2C4.I1.1
Implementation of an advanced and
integrated monitoring and
forecasting system
500.0 035 100% -
M2C4.I2.1.a Measures for flood and
hydrogeological risk reduction 81.6 035 100% -
M2C4.I2.1.b Measures for flood and
hydrogeological risk reduction 1 200.0 035 100% -
M2C4.I3.1 Protection and enhancement of
urban and peri-urban forests 210.0 050 40% -
M2C4.I3.2.a
Digitization of national parks.
Nature conservation - monitoring of
pressures and threats on species and
habitats and climate change
82.0 050 40% -
M2C4.I3.2.b
Digitization of national parks.
Digital services to visitors to
national parks and marine protected
areas
14.0 - 054 100%
M2C4.I3.2.c
Digitization of national parks.
Administrative simplification -
Digitisation and simplification of
procedures for services provided by
Parks and Marine Protected Areas
4.0 - 011 100%
M2C4.I3.3 Re-naturification of Po area 357.0 050 40% -
M2C4.I3.5 Restoration and protection of the
seabed and marine habitats 400.0 049 40% -
M2C4.I4.1
Investments in primary water
infrastructures for the security of
water supply
1 624.8 040 40% -
M2C4.I4.2
Reduction of losses in water
distribution networks, including
digitization and monitoring of
networks
1 924.0 039bis 40% -
M2C4.I4.3
Investments in the resilience of the
irrigation agrosystem for better
management of water resources
880.0 040 40% -
M2C4.I4.5 Grant scheme investments on water
infrastructure 1 576.3 040 40%
M3C1.I1.1.a
High-speed railway connections in
the centre and South for passengers
and freight (Napoli - Bari)
2 188.3 064 100% -
7
Climate Digital
Measure/Sub-
Measure ID Measure/Sub-Measure Name
Budget
(EUR m)
Int.
Field
Coeff.
% Int. Field
Coeff.
%
M3C1.I1.1.b
High-speed railway connections in
the centre and South for passengers
and freight (Palermo-Catania)
1 282.1 064 100% -
M3C1.I1.1.c
High-speed railway connections in
the centre and South for passengers
and freight (Salerno - Reggio
Calabria)
889.8 064 100% -
M3C1.I1.1.d
High-speed railway connections in
the centre and South for passengers
and freight (Orte-Falconara)
215.7 068 100% -
M3C1.I1.1.e
High-speed railway connections in
the centre and South for passengers
and freight (Taranto-Metaponto-
Potenza-Battipaglia)
84.1 065 100% -
M3C1.I1.2.a
High-speed lines in the North
connecting to the rest of Europe
(Brescia-Verona-Padova)
4 591.0 064 100% -
M3C1.I1.2.b
High-speed lines in the North
connecting to the rest of Europe
(Liguria-Alpi)
4 139.0 064 100% -
M3C1.I1.4
Introducing the European Rail
Transport Management System
(ERTMS)
2 466.0 071 40% 071 100%
M3C1.I1.8 Upgrading railway stations (RFI
management; in South) 525 069 40% -
M3C1.I1.10.a Strengthening metropolitan nodes
and regional railway lines_TEN-T 2 970.4 068 100%
M3C1.I1.10.b
Strengthening metropolitan nodes
and regional railway lines_other
railways
3 620.0 069 40%
M3C2.I2.1.a Digitalization of the logistic
chain_LogIN Center 40.0 - 084 100%
M3C2.I2.1.b
Digitalization of the logistic
chain_Network of ports and freight
terminals
50.0 - 084 100%
M3C2.I2.1.c Digitalization of the logistic
chain_LogIN Business 102.2 - 084 100%
M3C2.I2.2.a Digitalization of air traffic
management_optimization 16.0 - 084 100%
M3C2.I2.2.b Digitalization of air traffic
management_digitisation 18.0 - 084 100%
M3C2.I2.3 Cold ironing 400.0 077 100% -
M4C1.I2.1
Integrated digital teaching and
training on the digital
transformation for school staff;
800.0 - 108 100%
M4C1.I3.2
School 4.0: innovative schools,
wiring, new classrooms and
workshops
2 100.0 - 012 100%
M4C1.I3.4 Teaching and advanced university
skills 272.1 - 108 100%
M4C1.I4.1
Extension in number and career
opportunities of PhDs (Research-
oriented, Public Administration and
Cultural Heritage)
504.0 - 016 40%
8
Climate Digital
Measure/Sub-
Measure ID Measure/Sub-Measure Name
Budget
(EUR m)
Int.
Field
Coeff.
% Int. Field
Coeff.
%
M4C2.I1.3.a
Partnerships extended to
universities, research centers,
companies and funding of basic
research projects_R&D climate
change
483.0 022 100% -
M4C2.I1.3.b
Partnerships extended to
universities, research centers,
companies and funding of basic
research projects_R&D circular
economy
483.0 023 40% -
M4C2.I1.4.a
Strengthening research structures
and supporting the creation of
“national R&D leaders” on some
Key Enabling Technologies_R&D
climate change
480.0 022 100% -
M4C2.I1.4.b
Strengthening research structures
and supporting the creation of
“national R&D leaders” on some
Key Enabling Technologies_R&D
circular economy
240.0 023 40% -
M4C2.I1.4.c
Strengthening research structures
and supporting the creation of
“national R&D leaders” on some
Key Enabling Technologies_R&D
digital
240.0 - 009bis 100%
M4C2.I1.5
Establishing and strengthening of
“innovation ecosystems for
sustainability”, building “territorial
leaders of R&D”
1 242.8 - 019 40%
M4C2.I2.1.a IPCEI_digital 900.0 - 021quater 100%
M4C2.I2.1.b IPCEI_green 600.0 022 100% -
M4C2.I2.3
Strengthening and sectorial/
territorial extension of technology
transfer centres by industry
segments
350.0 - 010 100%
M4C2.I3.1
Fund for construction of an
integrated system of research and
innovation infrastructures
1 578.1 - 055 100%
M4C2.I3.3 Award of PhD scholarships in
collaboration with enterprises 360.0 - 016 40%
M5C1.R1 ALMPs and Vocational Training 4 577.8 - 016 40%
M5C1.I3 Strengthening the dual system. 600.0 - 016 40%
M5C1.I4 Universal Civil Service 950.0 - 099 40%
M5C2.I2.a Autonomy patterns for people with
disabilities_digital 108.5 - 012 100%
M5C2.I6.d Innovation Programme for Housing
Quality_energy efficiency 65 025 40%
M5C2.I6.e
Innovation Programme for Housing
Quality_energy efficiency public
buildings
35.0 026 40%
M5C2.I6.f
Innovation Programme for Housing
Quality_energy efficiency stricter
criteria
350.0 025bis 100%
9
Climate Digital
Measure/Sub-
Measure ID Measure/Sub-Measure Name
Budget
(EUR m)
Int.
Field
Coeff.
% Int. Field
Coeff.
%
M5C2.I7.b The Sport and Social Inclusion
project_efficient constructions 350.0 025ter 40% -
M5C3.I1.4 Infrastructural investments for the
Special Economic Zone 888.8 078 40% -
M6C1.I1.1.a
Community Health Houses to
improve territorial health
assistance_energy efficient new
constr
300.0 025ter 40% -
M6C1.I1.1.c
Community Health Houses to
improve territorial health
assistance_energy efficiency renov
500.0 026 40% -
M6C1.I1.2.a Home as the first place of care and
telemedicine_digital 1 780.0 - 013 100%
M6C2.I1.1.a Digital update of hospitals’
technological equipment_digital 1 450.1 - 095 100%
M6C2.I1.3
Strengthening of the technological
infrastructure and of the tools for
data collection, data processing,
data analysis and simulation
1 672.5 - 095 100%
M7.I1 Scale-up measure: Strengthening
smart grids 450.0 033 100% - 40%
M7.I2
Scale-up measure: Interventions to
increase the resilience of power
grid
63.2 037 100% -
M7.I3
Scale-up measure: Production of
Hydrogen in brownfield sites
(Hydrogen Valleys)
90.0 032 100% -
M7.I4 Tyrrhenian link 500.0 033 100% -
M7.I5 HVDC Connection Sardinia-
Corsica-Italy (SA.CO.I 3) 200.0 033 100% -
M7.I7 Smart National Transmission Grid 140.0 033 100% - 40%
M7.I8 Sustainable, circular and secure
supply of Critical Raw Materials 23.5 023 40% -
M7.I10 Pilot projects on skills “Crescere
Green” 100.0 01 100% -
M7.I11
Strenghtening of the regional public
transport railway fleet with zero-
emission trains and universal
service
949.5 072bis 100% -
M7.I15.a Transition 5.0 Green_energy
efficiency 2 500.0 024 40% -
M7.I15.b Transition 5.0 Green_self-
consumption and self-production 200.0 032 100% -
M7.I15.c Transition 5.0 Green_training 25.0 01 100% -
M7.I16
Support to SMEs for self-
production from renewable energy
sources
186.7 032 100% -
M7.I17
Financial instrument for energy
renovations public and social
housing
1 581.0 025bis 100% -
M7.I18
Private and light commercial
vehiclefleet renewal program with
electric vehicles
240.0 n.a.1 100%
10
While the estimated cost of Italy’s recovery and resilience plan exceeds the total allocation of non-
repayable financial support to Italy, Italy will ensure that all spending related to the measures mentioned
in this table as contributing to climate objectives are fully financed by the funds from the Recovery and
Resilience Facility.
* Reforms and investments in the REPowerEU chapter are not taken into account when calculating the
plan’s contribution to the digital target requirement set by Regulation (EU) 2021/241.
ET ET
EUROOPA KOMISJON
Brüssel, 7.8.2026 COM(2026) 434 final
2026/0238 (NLE)
Ettepanek:
NÕUKOGU RAKENDUSOTSUS,
millega muudetakse 13. juuli 2021. aasta rakendusotsust, millega kiidetakse heaks
Itaalia taaste- ja vastupidavuskavale antud hinnang
{SWD(2026) 266 final}
ET 1 ET
2026/0238 (NLE)
Ettepanek:
NÕUKOGU RAKENDUSOTSUS,
millega muudetakse 13. juuli 2021. aasta rakendusotsust, millega kiidetakse heaks
Itaalia taaste- ja vastupidavuskavale antud hinnang
EUROOPA LIIDU NÕUKOGU,
võttes arvesse Euroopa Liidu toimimise lepingut,
võttes arvesse Euroopa Parlamendi ja nõukogu 12. veebruari 2021. aasta määrust
(EL) 2021/241, millega luuakse taaste- ja vastupidavusrahastu,1 eriti selle artikli 20 lõiget 1,
võttes arvesse Euroopa Komisjoni ettepanekut
ning arvestades järgmist:
(1) Pärast seda, kui Itaalia oli 30. aprillil 2021 esitanud oma riikliku taaste- ja
vastupidavuskava (edaspidi „taaste- ja vastupidavuskava“ ja „kava“), tegi komisjon
nõukogule ettepaneku anda sellele positiivne hinnang. Nõukogu kiitis 13. juulil 2021
positiivse hinnangu rakendusotsusega (edaspidi „nõukogu 13. juuli 2021. aasta
rakendusotsus“)2 heaks. Nõukogu 13. juuli 2021. aasta rakendusotsust on muudetud
nõukogu 19. septembri 2023. aasta,3 8. detsembri 2023. aasta,4 14. mai 2024. aasta,5
18. novembri 2024. aasta,6 20 juuni 2025. aasta,7 27. novembri 2025. aasta8 ja 30.
märtsi 2026. aasta9 rakendusotsustega.
(2) Itaalia esitas 11. juunil 2026 komisjonile põhjendatud taotluse, milles ta tegi
ettepaneku muuta nõukogu 13. juuli 2021. aasta rakendusotsust vastavalt määruse
(EL) 2021/241 artikli 21 lõikele 1, sest taaste- ja vastupidavuskava ei ole objektiivsete
asjaolude tõttu enam võimalik teatud osas täita. Eelnevat arvesse võttes on Itaalia
esitanud muudetud taaste- ja vastupidavuskava.
Taaste- ja vastupidavuskavas vastavalt määruse (EL) 2021/241 artiklile 21 tehtud
muudatused
(3) Itaalia taaste- ja vastupidavuskavas objektiivsete asjaolude tõttu tehtud muudatused
puudutavad 118 meedet.
1 ELT L 57, 18.2.2021, lk 17, ELI:. https://eur-lex.europa.eu/eli/reg/2021/241/oj. 2 ST 10160/21 INIT; ST 10160/21 ADD 1 REV 2; ST 10160/21 ADD 1 REV 2 COR 1 (sk). 3 ST 12259/23 INIT. 4 ST 16051/23 INIT; ST 16051/23 ADD 1; ST 16051/23 ADD 1 REV 1 (ga). 5 ST 9399/24 INIT; ST 9399/24 ADD 1; ST 9399/24 ADD1 COR 2 (sv). 6 ST 15114/24 INIT; ST 15114 ADD 1 REV 1. 7 ST 9587/25 INIT; ST 9587/25 ADD 1. 8 ST 15106/25 INIT: ST 15106/25 ADD 1; ST 15106/25 ADD 1 COR 1 (sv). 9 ST 7138/26 INIT; ST 7138/26 ADD 1.
ET 2 ET
(4) Itaalia on taotlenud kahe meetme väljajätmist objektiivsete asjaolude tõttu. See
puudutab järgmist: ülesande 3 komponendi 1 raames investeeringu 1.3
(diagonaalühendused) sihti M3C1-11; ülesande 5 komponendi 3 raames investeeringu
1.5 (maksusoodustuste kava investeeringutele Lõuna-Itaalias ja erimajandustsoonides)
sihti M5C3-14. Nõukogu 13. juuli 2021. aasta rakendusotsust tuleks vastavalt muuta.
(5) Itaalia on selgitanud, et kolm meedet ei ole enam osaliselt rakendatavad nõudluse
puudumise või muutumise tõttu. See puudutab ülesande 2 komponendi 1 raames
investeeringu 2.3 (innovatsioon ja mehhaniseerimine põllumajandus- ja
toiduainesektoris) sihti M2C1-8; ülesande 2 komponendi 2 raames investeeringu 1.1
(põllumajanduses kasutatavate päikeseenergiasüsteemide arendamine) sihti M2C2-45:
ülesande 3 komponendi 2 raames investeeringu 2.1 (logistikaahela digiteerimine) sihti
M3C2-5bis. Selle põhjal on Itaalia taotlenud kõnealuste meetmete muutmist. Nõukogu
13. juuli 2021. aasta rakendusotsust tuleks vastavalt muuta.
(6) Itaalia on selgitanud, et viit meedet ei saa enam täielikult rakendada muutunud
turutingimuste, sealhulgas ettenägematute hankemenetlusi mõjutavate tarneviivituste
tõttu. See puudutab ülesande 1 komponendi 2 raames investeeringu 2
(mikroelektroonika innovatsioon ja tehnoloogia) sihti M1C2-15; ülesande 2
komponendi 1 raames investeeringu 2.2 (põllumajanduslik päikesepark) sihti M2C1-9;
investeeringu 4.3 (laadimistaristute paigaldamine) sihti M2C2-29; investeeringu 8
(kestlik, ringluspõhine ja turvaline varustamine kriitilise tähtsusega toorainetega) sihti
M7-27; ülesande 7 raames investeeringu 15 (Transizione 5.0) sihte M7-41 ja M7-42.
Selle põhjal on Itaalia taotlenud kõnealuste meetmete muutmist. Nõukogu 13. juuli
2021. aasta rakendusotsust tuleks vastavalt muuta.
(7) Itaalia on selgitanud, et üks meede ei ole osaliselt enam saavutatav tehniliste takistuste
tõttu, mis aeglustavad tegelikku rakendamist. See puudutab ülesande 3 komponendi 1
raames reformi 1.3 (Itaalia raudteetaristu tõhususe suurendamine) sihte M3C1-26 ja
M3C1-27. Selle põhjal on Itaalia taotlenud kõnealuste meetmete muutmist. Nõukogu
13. juuli 2021. aasta rakendusotsust tuleks vastavalt muuta.
(8) Itaalia on selgitanud, et kaks meedet ei ole inflatsiooni ja tehnilist laadi
tegevusprobleemide tõttu osaliselt enam saavutatavad. See puudutab investeeringu 1.1
(reisijate ja kauba kiirrongiühendused riigi kesk- ja lõunaossa) sihte M3C1-5 ja
M3C1-6; ülesande 3 komponendi 1 raames investeeringu 1.2 (riigi põhjaosa ülejäänud
Euroopaga ühendavad kiirraudteeliinid) sihti M3C1-9; Selle põhjal on Itaalia taotlenud
kõnealuste meetmete muutmist. Nõukogu 13. juuli 2021. aasta rakendusotsust tuleks
vastavalt muuta.
(9) Itaalia on selgitanud, et üks meede ei ole osaliselt enam saavutatav äärmuslike
ilmastikunähtuste tõttu, mis tingisid eriolukorra väljakuulutamise10 2025. ja 2026.
aastal ning mõjutasid Calabria, Sardiinia ja Sitsiilia territooriume. See puudutab
ülesande 2 komponendi 4 raames investeeringu 4.4 (investeeringud kanalisatsiooni ja
veepuhastussüsteemidesse) siht M2C4-38. Selle põhjal on Itaalia taotlenud kõnealuse
meetme muutmist. Nõukogu 13. juuli 2021. aasta rakendusotsust tuleks vastavalt
muuta.
10 Ministrite nõukogu 4. juuni 2025. aasta arutelu Catania ja Messina suurlinnapiirkondade eriolukorra
väljakuulutamise üle; ministrite nõukogu 26. jaanuari 2026. aasta arutelu nr 157, millega kuulutatakse
Calabria, Sitsiilia ja Sardiinia territooriumidel välja eriolukord.
ET 3 ET
(10) Itaalia on selgitanud, et meetmete algse eesmärgi saavutamiseks on üheksat meedet
muudetud, et rakendada paremaid alternatiive. See puudutab ülesande 1 komponendi 2
raames investeeringu 9 (laiendatud meede: üleminek 4.0) sihti M1C2-34;
investeeringu 4.4.2 (piirkondliku ühistranspordi raudteeveeremi parandamine
heitevabade rongide kasutuselevõtu ja universaalteenuse osutamisega) sihti M2C2-
35bis; ülesande 2 komponendi 2 raames investeeringu 5.4 (omakapitalisisend
rohepöörde fondi, mida haldab CDP Venture Capital SGR) sihti M2C2-43;
investeeringu 1.2 (taastuvenergia edendamine energiakogukondades ja koos
omatarbeks toodetud taastuvenergia tarbijatega) sihti M2C2-47; ülesande 2
komponendi 4 raames investeeringu 4.5 (toetuskava veetaristuinvesteeringute jaoks)
sihte M2C4-39 ja M2C4-40; ülesande 3 komponendi 1 raames investeeringu 1.8
(raudteejaamade ajakohastamine) sihti M3C1-20; investeeringu 11 (laiendatud meede:
piirkondliku ühistranspordi raudteeveeremi parandamine heitevabade rongide
kasutuselevõtu ja universaalteenuse osutamisega) sihti M7-31; investeeringu 16
(taastuvatest energiaallikatest oma tarbeks tootvate VKEde toetamine) sihti M7-44;
ülesande 7 raames investeeringu 17 (avaliku sektori elamute energiatõhusaks
renoveerimise rahastamisvahend) sihti M7-49. Selle põhjal on Itaalia taotlenud
kõnealuste meetmete muutmist. Nõukogu 13. juuli 2021. aasta rakendusotsust tuleks
vastavalt muuta.
(11) Itaalia on selgitanud, et 93 meedet on muudetud, et rakendada paremaid alternatiive,
mis võimaldavad vähendada halduskoormust ja lihtsustada nõukogu rakendusotsust,
ent saavutada samal ajal kõnealuste meetmete eesmärgid. See puudutab järgmist:
investeeringu 1.1 (digitaristu) sihti M1C1-26; reformi 1.4 (tsiviilõiguse reform) sihti
M1C1-45; reformi 1.5 (kriminaalõiguse reform) sihti M1C1-46; reformi 1.9 (avaliku
sektori tööhõivereform ja lihtsustamise reform) sihte M1C1-59ter ja M1C1-63;
investeeringu 1.9. (tehnilise abi andmine ja suutlikkuse suurendamine Itaalia taaste- ja
vastupidavuskava rakendamiseks) sihti M1C1-66; reformi 1.15 (avaliku sektori
raamatupidamiseeskirjade reform) sihti M1C1-117; reformi 1.14 (madalama kui riigi
tasandi eelarveraamistiku reform) sihti M1C1-119; reformi 1.12 (maksuhalduse
reform) sihti M1C1-121bis; reformi 1.13 (kulude läbivaatamise raamistiku reform)
sihti M1C1-122; investeeringu 1.4.1 (kodanike kogemused – digitaalsete avalike
teenuste kvaliteedi ja kasutajasõbralikkuse parandamine) sihti M1C1-148;
investeeringu 1.4.5 (avalike teadete digitaliseerimine) sihti M1C1-151; investeeringu
1.6.1 (siseministeeriumi digitaliseerimine) sihti M1C1-152; ülesande 1 komponendi 1
raames investeeringu 1.6.3 (riikliku sotsiaalkindlustusameti (INPS) ja riikliku
tööõnnetuste vastu kindlustamise instituudi (INAIL) digitaliseerimine) sihti M1C1-
155; reformi 2 (iga-aastased konkurentsiseadused) sihti M1C2-13bis; reformi 3
(ettevõtete stiimulite ratsionaliseerimine ja lihtsustamine) sihti M1C2-14ter;
investeeringu 3 (kiire internetiühendus (Ultra lairibaühendus ja 5G)) sihte M1C2-17,
M1C2-18, M1C2-20 ja M1C2-21; ülesande 1 komponendi 2 raames investeeringu 4
(satelliittehnoloogia ja kosmosemajandus) sihti M1C2-23bis; investeeringu 1.2
(füüsiliste ja kognitiivsete tõkete eemaldamine muuseumides, raamatukogudes ja
arhiivides, et võimaldada kultuurile laiemat juurdepääsu ja selles osalemist) sihti
M1C3-3; investeeringu 2.1 (väikeste ajalooliste linnade atraktiivsus) sihti M1C3-
16bis; investeeringu 2.2 (maaeluarhitektuuri ja maastike kaitse ja edendamine) sihti
M1C3-17: investeeringu 2.4 (pühapaikade seismiline ohutus, FEC (Fondo Edifici di
Culto) pärandi ja kunstiteoste varjupaikade taastamine (taastekunst)) sihti M1C3-19;
investeeringu 3.2 (filmitööstuse arendamine (Cinecittà projekt)) sihti M1C3-21;
investeeringu 4.2 (vahendid turismiettevõtjate konkurentsivõime suurendamiseks) sihti
M1C3-29; ülesande 1 komponendi 3 raames investeeringu 4.3 (Caput Mundi – Next
ET 4 ET
Generation EU turismialastele suurüritustele) sihti M1C3-36; investeeringu 2.1
(põllumajandusliku toidutööstuse, kalanduse ja vesiviljeluse, metsanduse,
lillekasvatuse ja taimekasvatussektori logistikakava) sihti M2C1-10; investeeringu 1.1
(uute jäätmekäitlusrajatiste rakendamine ja olemasolevate rajatiste moderniseerimine
ning ringmajanduse juhtalgatused) sihti M2C1-16quater; investeeringu 3.1 (rohelised
saared) sihti M2C1-19; ülesande 2 komponendi 1 raames investeeringu 3.2 (rohelised
kogukonnad) sihti M2C1-21; investeeringu 2.1 (arukate võrkude tugevdamine) sihti
M2C2-10; investeeringu 2.2 (meetmed elektrivõrgu vastupidavuse suurendamiseks)
sihti M2C2-13; investeeringu 3.4 (vesinikukatsed raudtee- ja maanteetranspordi
valdkonnas) sihti M2C2-17; investeeringu 4.1 (investeerimine kergliiklusse (riiklik
rattateede kava)) sihti M2C2-23; investeeringu 4.2 (kiirtranspordisüsteemide
arendamine) sihti M2C2-26; investeeringu 4.5 (era- ja väikeste tarbesõidukite pargi
elektrisõidukitega uuendamise programm) sihti M2C2-30; investeeringu 4.4.1 (heiteta
bussidega piirkondliku ühistranspordi bussipargi uuendamine) sihti M2C2-35ter;
investeeringu 5.1 (ökoloogilise ülemineku tootmissüsteemi, nullnetotehnoloogia ning
strateegiliste tarneahelate konkurentsivõime ja vastupidavuse toetamine) sihti M2C2-
40; investeeringu 3.1 (vesiniku tootmine mahajäetud tööstusaladel (Hydrogen
Valleys)) sihti M2C2-49; ülesande 2 komponendi 2 raames investeeringu 5.2 (vesinik)
sihti M2C2-53; investeeringu 1.1 (uute koolide ehitamine hoonete asendamise teel)
sihti M2C3-6; ülesande 2 komponendi 3 raames investeeringu 3.1 (tõhusa kaugkütte
edendamine) sihti M2C3-10: investeeringu 3.2 (digitehnoloogia kasutuselevõtt
rahvusparkides) sihti M2C4-6bis; investeeringu 2.1a (üleujutusriski ja
hüdrogeoloogilise riski vähendamise meetmed – sekkumised Emilia Romagnas,
Toscanas ja Marches) sihti M2C4-11bis; investeeringu 2.1b (üleujutusriski ja
hüdrogeoloogilise riski vähendamise meetmed) sihti M2C4-13; investeeringu 3.1
(linna- ja linnalähedaste metsade kaitse ja edendamine) sihti M2C4-20bis;
investeeringu 3.3 (Po piirkonnas looduskeskkonna taastamine) sihti M2C4-23;
investeeringu 3.4 (harva kasutatavate alade mulla tervendamine) sihti M2C4-25;
investeeringu 4.1 (investeeringud põhiveetaristusse veevarustuse kindluse tagamiseks)
sihti M2C4-29; ülesande 2 komponendi 4 raames investeeringu 4.3 (investeeringud
niisutuspõllumajandussüsteemi vastupidavusse veevarude paremaks majandamiseks)
sihti M2C4-34bis; investeeringu 1.4 (Euroopa raudteetranspordi juhtimissüsteem
(ERTMS)) sihti M3C1-14; ülesande 3 komponendi 1 raames investeeringu 1.10
(suurlinnade transpordisõlmede ja piirkondlike raudteeühenduste tugevdamine) sihti
M3C1-28; investeeringu 2.2 (lennuliikluse korraldamise digitaliseerimine) sihti
M3C2-6; investeeringu 1.1 (rohelised sadamad: taastuvenergia kasutuse laiendamine
ja energiatõhususe suurendamine sadamates) sihti M3C2-9; ülesande 3 komponendi 2
raames investeeringu 2.3 (elektriühendused kail) sihti M3C2-12; reformi 2.1 (õpetajate
värbamine) sihti M4C1-14ter; investeeringu 1.1 (lasteaedu, eelkoole ning alusharidust
ja lastehoiuteenuseid käsitlev kava) sihti M4C1-18; investeeringu 5 (kolmanda taseme
kutseõppesüsteemi arendamine) sihti M4C1-20; investeeringu 1.2 (täistööajaga
töötamise pikendamise kava) sihti M4C1-21; investeeringu 1.3 (koolispordi
infrastruktuuri edendamise kava) sihti M4C1-22; investeeringu 1.6 (aktiivne
kutseorientatsioon koolist ülikooli minejatele) sihi M4C1-24 meetme kirjeldust;
investeeringu 3.3 (koolide ehitamise turvalisuse ja struktuurilise taastamise kava) sihti
M4C1-26; ülesande 4 komponendi 1 raames investeeringu 1.7 (üliõpilaste eluasemed)
sihti M4C1-30; investeeringu 1.4 (riiklike teadus- ja arendustegevuse juhtivate
ettevõtete loomine peamiste progressi võimaldavate tehnoloogiate valdkonnas) sihti
M4C2-9; investeeringu 2.3 (tehnoloogiasiirdekeskused) sihti M4C2-14; investeeringu
3.1 (teadus- ja innovatsioonitaristu) sihti M4C2-16bis; ülesande 4 komponendi 2
raames investeeringu 1.5 (kestliku innovatsiooni ökosüsteemid, teadus- ja
ET 5 ET
arendustegevuse territoriaalsete juhtivate ettevõtete väljakujundamine) sihti M4C2-
18bis; reformi 1 (aktiivne tööturupoliitika ja kutseõpe) sihti M5C1-4bis; investeeringu
1 (avalike tööturuasutuste tugevdamine) sihti M5C1-7bis; reformi 2 (deklareerimata
töö) sihti M5C1-11; ülesande 5 komponendi 1 raames investeeringu 2 (soolise
võrdõiguslikkuse sertifitseerimise süsteem) sihti M5C1-14; ülesande 5 komponendi 1
raames investeeringu 4 (avalik teenistus) sihti M5C1-16; investeeringu 3 („Housing
First“ ja tugikeskused) meetme kirjeldust; investeeringu 2 (autonoomsusmustrid
puuetega inimeste jaoks) sihti M5C2-8; investeeringu 4 (investeeringud linnade
taaselustamise projektidesse, et vähendada marginaliseerumist ja sotsiaalse olukorra
halvenemist) sihti M5C2-12; investeeringu 5 (linnade integratsioonikavad) sihte
M5C2-14 ja M5C2-16; investeeringu 6 (eluasemekvaliteedi innovatsiooniprogramm)
sihti M5C2-20; ülesande 5 komponendi 2 raames investeeringu 7 (sport ja sotsiaalne
kaasatus) sihti M5C2-22; ülesande 5 komponendi 3 raames investeeringu 1.4
(taristuinvesteeringud erimajandustsoonides) sihti M5C3-13; investeeringu 1.3
(vahetasandi tervishoiu ja selle rajatiste tugevdamine (kogukonnahaiglad)) sihti
M6C1-11; investeeringu 1.1 (haiglate tehnoloogiliste seadmete digitaalne
ajakohastamine) sihte M6C2-6 ja M6C2-9; investeeringu 1.2 (ohutud ja kestlikud
haiglad) sihti M6C2-10bis; ülesande 6 komponendi 2 raames investeeringu 1.3
(tehnilise taristu ning andmete kogumise, töötlemise, analüüsimise ja modelleerimise
vahendite tugevdamine) sihti M6C2-12; investeeringu 2.2 (tervishoiusüsteemi
spetsialistide tehniliste, kutsealaste, digitaalsete ja juhtimisoskuste arendamine) sihti
M6C2-16; reformi 1 (taastuvenergia loamenetluste lihtsustamine kesk- ja kohalikul
tasandil) eesmärki M7-3; investeeringu 1 (laiendatud meede: arukad võrgud) sihti M7-
11; investeeringu 2 (laiendatud meede: meetmed elektrivõrgu vastupidavuse
suurendamiseks) sihti M7-12; investeeringu 3 (laiendatud meede: vesiniku tootmine
mahajäetud tööstusaladel (Hydrogen Valleys)) sihti M7-13; investeeringu 4 (Türreeni
ühendus) sihti M7-15; investeeringu 5 (SA.CO.I.3) sihti M7-17; investeeringu 7
(riiklik tark ülekandevõrk) sihti M7-22; investeeringu 13 (Aadria mere torujuhtme 1.
etapp (Sulmona kompressorjaam ja Sestino-Minerbio gaasijuhe)) sihti M7-37;
investeeringu 14 (gaasi piiriülene eksporditaristu) sihti M7-39; ülesande 7 raames
investeeringu 18 (laiendatud meede: era- ja väikeste tarbesõidukite pargi
elektrisõidukite abil uuendamise programm) sihti M7-50. Selle põhjal on Itaalia
taotlenud kõnealuste meetmete muutmist. Nõukogu 13. juuli 2021. aasta
rakendusotsust tuleks vastavalt muuta.
(12) Pärast meetmete väljajätmist ja nende rakendamise taseme alandamist vastavalt
määruse (EL) 2021/241 artiklile 21 on Itaalia esitanud taotluse võtta kasutusele
vahendid, mis vabanesid meetmete väljajätmise ja nende rakendamise taseme
alandamise tulemusel, ninglisada kaks uut meedet ja tõsta kaheksa meetme
rakendamise taset. See puudutab ülesande 1 komponendi 2 raames investeeringu 9
(laiendatud meede: üleminek 4.0) sihti M1C2-34; investeeringu 4.4.2 (piirkondliku
ühistranspordi raudteeveeremi parandamine heitevabade rongide kasutuselevõtu ja
universaalteenuse osutamisega) sihti M2C2-35bis; investeeringu 1.2 (taastuvenergia
edendamine energiakogukondades ja koos omatarbeks toodetud taastuvenergia
tarbijatega) sihti M2C2-47; investeeringu 4.6 (diagnostikarongid) sihti M2C2-54;
ülesande 2 komponendi 2 raames investeeringu 5.5 (roheline maksukrediit) sihti
M2C2-55; ülesande 2 komponendi 4 raames investeeringu 4.5 (toetuskava
veetaristuinvesteeringute jaoks) sihte M2C4-39 ja M2C4-40; ülesande 3 komponendi
1 raames investeeringu 1.8 (raudteejaamade ajakohastamine) sihti M3C1-20; ülesande
5 komponendi 1 raames investeeringu 5 (naistele kuuluvate ettevõtete loomine) sihte
M5C1-19bis ja M5C1-20; investeeringu 11 (laiendatud meede: piirkondliku
ET 6 ET
ühistranspordi raudteeveeremi parandamine heitevabade rongide kasutuselevõtu ja
universaalteenuse osutamisega) sihti M7-31; investeeringu 16 (taastuvatest
energiaallikatest oma tarbeks tootvate VKEde toetamine) sihte M7-44 ja M7-45;
ülesande 7 raames investeeringu 17 (avaliku sektori elamute energiatõhusaks
renoveerimise rahastamisvahend) sihti M7-49. Seda arvesse võttes on Itaalia taotlenud
kaheksa meetme rakendamise taseme tõstmist ja kahe uue meetme lisamist. Nõukogu
13. juuli 2021. aasta rakendusotsust tuleks vastavalt muuta.
Tehniliste vigade parandamine
(13) Nõukogu 13. juuli 2021. aasta rakendusotsuse tekstist on leitud kolm tehnilist viga,
mis mõjutavad kaht eesmärki ja sihti kahe komponendi kahe meetme all. Nõukogu 13.
juuli 2021. aasta rakendusotsust tuleks muuta, et parandada need tehnilised vead, mis
ei kajasta komisjonile 30. aprillil 2021 esitatud taaste- ja vastupidavuskava sisu nii,
nagu komisjon ja Itaalia selles kokku leppisid. Need tehnilised vead on seotud
ülesande 1 komponendi 2 raames investeeringu 7 (riiklik ühenduvusfond) sihiga
M1C2-31 ja ülesande 4 komponendi 1 raames investeeringu 3.4 (õpetamise ja
ülikoolihariduse edendamine) sihiga M4C1-23. Paranduste tegemine ei mõjuta
nimetatud meetmete rakendamist.
Komisjoni hinnang
(14) Komisjon andis määruse (EL) 2021/241 artikli 19 lõikes 3 sätestatud
hindamiskriteeriumidest lähtudes muudetud taaste- ja vastupidavuskavale oma
hinnangu.
Panus REPowerEU eesmärkide saavutamisse
(15) Vastavalt määruse (EL) 2021/241 artikli 19 lõike 3 punktile da ja V lisa
kriteeriumile 2.12 peaks REPowerEU peatükk suures ulatuses (hinne A) tulemuslikult
kaasa aitama energiajulgeolekule, liidu energiavarustuse mitmekesistamisele,
taastuvate energiaallikate kasutuselevõtu, energiatõhususe ja energiasalvestusvõimsuse
suurendamisele või fossiilkütustest sõltuvuse vajalikule vähendamisele enne
2030. aastat.
(16) Muudatused, mis käsitlevad reformi 1 (taastuvenergia loamenetluste lihtsustamine
kesk- ja kohalikul tasandil); investeeringut 1 (laiendatud meede: arukad võrgud);
investeeringut 2 (laiendatud meede: meetmed elektrivõrgu vastupidavuse
suurendamiseks); investeeringut 3 (laiendatud meede: vesiniku tootmine mahajäetud
tööstusaladel (Hydrogen Valleys)); investeeringut 4 (Türreeni ühendus);
investeeringut 5 (SA.CO.I.3); investeeringut 7 (riiklik tark ülekandevõrk);
investeeringut 8 (kestlik, ringluspõhine ja turvaline varustamine kriitilise tähtsusega
toorainetega); investeeringut 11 (piirkondliku ühistranspordi raudteeveeremi
parandamine heitevabade rongide kasutuselevõtu ja universaalteenuse osutamisega);
investeeringut 13 (Aadria mere torujuhtme 1. etapp (Sulmona kompressorjaam ja
Sestino-Minerbio gaasijuhe)); investeeringut 14 (gaasi piiriülene eksporditaristu);
investeeringut 15 (Transizione 5.0); investeeringut 16 (taastuvatest energiaallikatest
oma tarbeks tootvate VKEde toetamine); investeeringut 17 (avaliku sektori elamute
energiatõhusaks renoveerimise rahastamisvahend) ja investeeringut 18 (laiendatud
investeering: era- ja väikeste tarbesõidukite pargi elektrisõidukite abil uuendamise
programm), ei muuda üldhinnangut, mille kohaselt REPowerEU peatükis sisalduvate
meetmete rakendamine peaks aitama eelkõige toetada määruse (EL) 2021/241 artikli
21c lõike 3 punktides a, b, c, d, e ja f sätestatud eesmärke. Peatükk aitab tõhusalt kaasa
energiajulgeolekule, liidu energiavarustuse mitmekesistamisele, taastuvate
ET 7 ET
energiaallikate suuremale kasutuselevõtule ja energiatõhususele ning fossiilkütustest
sõltuvuse vähendamisele enne 2030. aastat. Seega aitab muudetud kava tõhusalt kaasa
artikli 19 lõike 3 punkti da eesmärkide saavutamisele.
Rohepöörde, sealhulgas elurikkuse toetamine
(17) Vastavalt määruse (EL) 2021/241 artikli 19 lõike 3 punktile e ja V lisa
kriteeriumile 2.5 sisaldab muudetud taaste- ja vastupidavuskava (all)meetmeid, mis
aitavad suures ulatuses (hinne A) kaasa rohepöördele, sealhulgas elurikkusele, või
sellest tulenevate probleemide lahendamisele. Kliimaeesmärkide saavutamist toetavad
meetmed moodustavad 37 % muudetud taaste- ja vastupidavuskava kogueraldisest ja
71,9 % REPowerEU peatükis sisalduvate meetmete hinnangulisest kogukulust, mis on
arvutatud vastavalt määruse (EL) 2021/241 VI lisas esitatud metoodikale. Vastavalt
määruse (EL) 2021/241 artiklile 17 on muudetud taaste- ja vastupidavuskava
kooskõlas riiklikus energia- ja kliimakavas (2021–2030) sisalduva teabega.
(18) Rohepöördesse antava panuse muudatused on seotud mitme eri ülesandeid ja
komponente hõlmava meetme jaoks tehtava eraldise vähenemisega. Osaliselt
tasakaalustasid seda vähenemist mitmed uued investeeringud ja meetmed, mida
rakendati jõulisemalt. Eraldise vähenemine puudutas ülesande 2 komponendi 1 raames
investeeringut 2.2 (põllumajanduslik päikesepark). Investeeringu 1.2 (taastuvenergia
edendamine energiakogukondade ja ühiselt oma tarbeks toodetava taastuvenergia
tarbijate jaoks) suurendamine koos investeeringu 4.4.2 (piirkondliku ühistranspordi
raudteeveeremi parandamine heitevabade rongide kasutuselevõtu ja universaalteenuse
osutamisega) ja investeeringu 5.1 (nullnetotehnoloogia) eraldise suurendamisega,
investeeringu 4.6 (diagnostikarongid) ja investeeringu 5.5 (roheline maksukrediit)
loomisega ning rohemärgistuse suurendamisega ka investeeringu 5.4
(omakapitalisisend rohepöörde fondi, mida haldab CDP Venture Capital SGR) puhul
kompenseeris enam kui küllaldaselt investeeringu 1.1 (põllumajanduses kasutatavate
päikeseenergiasüsteemide arendamine) ja investeeringu 4.3 (laadimistaristute
paigaldamine) vähendamise ülesande 2 komponendi 2 raames. Eraldise suurenemine
puudutas ülesande 2 komponendi 4 raames investeeringut 4.5 (toetuskava
veetaristuinvesteeringute jaoks). Lisaks tasakaalustas ülesande 3 komponendi 1
raames reformile 1.3 (Itaalia raudteetaristu tõhususe suurendamine) eraldatud
vahendite vähendamist osaliselt investeeringule 1.8 (raudteejaamade ajakohastamine)
eraldatud vahendite suurendamine. Samuti puudutas eraldise vähenemine ülesande 5
komponendi 2 raames investeeringut 6 (eluasemekvaliteedi innovatsiooniprogramm);
ning ülesande 6 komponendi 1 raames investeeringut 1.1 (kogukondlikud
tervishoiukojad kodulähedase terviseabi toetamiseks). Ülesande 7 raames
rohepöördesse panustamise eraldiste vähenemist investeeringu 8 (kestlik,
ringluspõhine ja turvaline varustamine kriitilise tähtsusega toorainetega) ja ülesande 7
raames investeeringu 15 (Transizione 5.0) puhul tasakaalustas enam kui täielikult
eraldise suurenemine investeeringu 11 (laiendatud meede: piirkondliku ühistranspordi
raudteeveeremi parandamine heitevabade rongide kasutuselevõtu ja universaalteenuse
osutamisega), investeeringu 16 (taastuvatest energiaallikatest oma tarbeks tootvate
VKEde toetamine) ja investeeringu 17 (avaliku sektori elamute energiatõhusaks
renoveerimise rahastamisvahend) puhul.
(19) Üldiselt aitavad muudetud taaste- ja vastupidavuskava meetmed jätkuvalt
märkimisväärselt kaasa Itaalia rohepöördele. Tulenevalt suurendatud meetme ja
vähendatud meetmete erinevast kliimamärgistusest toovad Itaalia taaste- ja
vastupidavuskava muudatused kaasa kava kliimaeesmärgi saavutamisse antava üldise
ET 8 ET
panuse 0,1 % netokahanemise (37,1 %-lt 37 %-le). Nende muudatuste ulatus ei muuda
üldist hinnangut kõnealusele kriteeriumile.
Panus digipöördesse
(20) Vastavalt määruse (EL) 2021/241 artikli 19 lõike 3 punktile f ja V lisa
kriteeriumile 2.6 sisaldab muudetud taaste- ja vastupidavuskava meetmeid, mis
aitavad suures ulatuses (hinne A) kaasa digipöördele või sellest tulenevate
probleemide lahendamisele. Digieesmärkide saavutamist toetavad meetmed
moodustavad 26,4 % muudetud taaste- ja vastupidavuskava kogueraldisest, mis on
arvutatud vastavalt kõnealuse määruse VII lisas esitatud metoodikale.
(21) Eraldise vähenemine puudutab ülesande 1 komponendi 2 raames investeeringut 2
(mikroelektroonika innovatsioon ja tehnoloogia) ja ülesande 3 komponendi 2 raames
investeeringut 2.1 (logistikaahela digitaliseerimine).
(22) Üldiselt aitavad muudetud taaste- ja vastupidavuskava meetmed jätkuvalt kaasa Itaalia
digipöördele. Tulenevalt vähendatud meetmete erinevast digimärgistusest toovad
Itaalia taaste- ja vastupidavuskava muudatused kaasa 0,1 % netokahanemise (26,5 %-lt
26,4 %-le). Nende muudatuste piiratud ulatus ei anna põhjust muuta kõnealusele
kriteeriumile antud üldist hinnangut.
Kulud
(23) Vastavalt määruse (EL) 2021/241 artikli 19 lõike 3 punktile i ja V lisa
kriteeriumile 2.9 on muudetud taaste- ja vastupidavuskavas esitatud põhjendused
taaste- ja vastupidavuskava hinnangulise kogukulu summa kohta mõõdukas ulatuses
(hinne B) mõistlikud ja põhjendatud, kooskõlas kulutõhususe põhimõttega ja
vastavuses riigis eeldatava majandusliku ja sotsiaalmõjuga.
(24) Muudetud taaste- ja vastupidavuskava hinnangulised kogukulud on kooskõlas
kavandatud reformide ja investeeringute laadi ja liigiga. Seega peetakse enamiku
muudetud taaste- ja vastupidavuskava meetmete kuluprognoose mõistlikeks ja
realistlikeks. Itaalia on esitanud piisavalt teavet ja tõendeid selle kohta, et
hinnanguline kogukulu ei ole kaetud liidult juba saadud või saadava rahasummaga.
Muudetud taaste- ja vastupidavuskava hinnanguline kogukulu on kooskõlas
kulutõhususe põhimõttega ja vastavuses riigis eeldatava majandusliku ja
sotsiaalmõjuga. Seepärast antakse muudetud taaste- ja vastupidavuskavale hinne B.
Muud hindamiskriteeriumid
(25) Komisjon leiab, et Itaalia esitatud muudatused ei mõjuta nõukogu 13. juuli 2021. aasta
rakendusotsuses 10160/21 (Itaalia taaste- ja vastupidavuskavale antud hinnangu
heakskiitmise kohta) antud positiivset hinnangut taaste- ja vastupidavuskava
asjakohasusele, tulemuslikkusele, tõhususele ja sidususele artikli 19 lõike 3
punktides a, b, c, d, db, g, h, j ja k sätestatud hindamiskriteeriumide alusel.
Positiivne hinnang
(26) Pärast seda, kui komisjon on andnud muudetud taaste- ja vastupidavuskavale
positiivse hinnangu ja leidnud, et kava vastab rahuldavalt määruses (EL) 2021/241
sätestatud hindamiskriteeriumidele, tuleks kooskõlas kõnealuse määruse artikli 20
lõikega 2 ja V lisaga ette näha muudetud taaste- ja vastupidavuskava rakendamiseks
vajalikud reformid ja investeerimisprojektid, asjakohased eesmärgid, sihid ja näitajad
ning summa, mille liit teeb muudetud taaste- ja vastupidavuskava rakendamiseks
kättesaadavaks.
ET 9 ET
Rahaline toetus
(27) Itaalia muudetud taaste- ja vastupidavuskava kogukulu on hinnanguliselt
194 435 381 164 eurot. Kuna muudetud taaste- ja vastupidavuskava hinnanguline
kogukulu on suurem kui Itaalia jaoks ette nähtud ajakohastatud maksimaalne rahaline
toetus, peaks Itaalia muudetud taaste- ja vastupidavuskava jaoks eraldatud, Euroopa
Parlamendi ja nõukogu määruse (EL) 2021/175511 artikli 4a, määruse (EL) 2021/241
artikli 20 lõike 4 ja artikli 21a lõike 6 kohaselt arvutatud rahaline toetus olema võrdne
71 779 623 788 euroga. Seepärast Itaalia jaoks ette nähtud rahalist toetust ei muudeta.
Laenud
(28) Itaaliale kättesaadavaks tehtud laenutoetus summas 122 601 810 400 eurot jääb
samaks.
(29) Nõukogu 13. juuli 2021. aasta rakendusotsust tuleks seetõttu vastavalt muuta. Selguse
huvides tuleks 13. juuli 2021. aasta nõukogu rakendusotsuse lisa täielikult asendada,
(30) Käesolev otsus ei tohiks mõjutada selliste menetluste tulemust, mis on seotud liidu
vahendite eraldamisega muude kui rahastu kohaste liidu programmide raames, ega
selliseid menetlusi, mis on seotud siseturu toimimise moonutamisega ja mida võidakse
algatada eelkõige ELi toimimise lepingu artiklite 107 ja 108 alusel. See ei vabasta
liikmesriike aluslepingu artikli 108 kohasest kohustusest teavitada komisjoni
võimalikest riigiabi juhtudest,
ON VASTU VÕTNUD KÄESOLEVA OTSUSE:
Artikkel 1
Taaste- ja vastupidavuskavale antud hinnangu heakskiitmine
Itaalia muudetud taaste- ja vastupidavuskavale määruse (EL) 2021/241 artikli 19 lõikes 3
sätestatud kriteeriumide alusel antud hinnang kiidetakse heaks.
Artikkel 2
Muudatused
Nõukogu 13. juuli 2021. aasta rakendusotsust, millega kiidetakse heaks Itaalia taaste- ja
vastupidavuskavale antud hinnang, muudetakse järgmiselt:
lisa asendatakse käesoleva otsuse lisas esitatud tekstiga.
Artikkel 3
Adressaat
Käesolev otsus on adresseeritud Itaalia Vabariigile.
Brüssel,
Nõukogu nimel
eesistuja
11 Euroopa Parlamendi ja nõukogu 6. oktoobri 2021. aasta määrus (EL) 2021/1755, millega luuakse
Brexitiga kohanemise reserv (ELT L 357, 8.10.2021, lk 1,
ELI: http://data.europa.eu/eli/reg/2021/1755/oj).
ET ET
EUROOPA KOMISJON
Brüssel, 7.8.2026 COM(2026) 434 final
ANNEX
LISA
järgmise dokumendi juurde:
Ettepanek: NÕUKOGU RAKENDUSOTSUS,
millega muudetakse 13. juuli 2021. aasta rakendusotsust, millega kiidetakse heaks
Itaalia taaste- ja vastupidavuskavale antud hinnang
{SWD(2026) 266 final}
1
LISA
1. REFORMIDE JA INVESTEERINGUTE KIRJELDUS
A. ÜLESANDE 1 KOMPONENT 1
Telg – Avaliku halduse digitaliseerimine: Itaalia taaste- ja vastupidavuskava komponendi M1C1 1.
telg sisaldab meetmeid, mille eesmärk on edendada Itaalia avaliku halduse digitaliseerimist, ning
seitset investeeringut ja kolme reformi. Investeeringute eesmärk on eelkõige: i) avaliku halduse
olemasolevate digitaristute ratsionaliseerimine ja konsolideerimine; ii) edendada pilvandmetöötluse
kasutuselevõttu, iii) pöörates erilist tähelepanu platvormide ja andmeteenuste ühtlustamisele ja
koostalitlusvõimele, ühekordsuse põhimõtte rakendamisele ja andmete kättesaadavusele
rakendusliideste kataloogi kaudu; iv) parandada kõigi digitaalsete avalike teenuste kättesaadavust,
tõhusust ja juurdepääsetavust, et suurendada nende kasutuselevõttu ja kasutajate rahulolu, v)
tugevdada Itaalia kaitset küberkuritegevusest tulenevate ohtude eest, vi) edendada suurte
keskvalitsuste digiüleminekut; vii) võideldakse digilõhe vastu, tugevdades kodanike digioskusi. Selle
telje reformide eesmärk on eelkõige i) ühtlustada ja kiirendada avaliku halduse info- ja
kommunikatsioonitehnoloogia (IKT) lahenduste hankeprotsessi; ii) toetada avaliku halduse
digiüleminekut ning iii) kõrvaldada takistused, mis ei lase haldusasutustel pilvandmetöötlust
kasutusele võtta, ja ühtlustada haldusasutuste vahelisi andmevahetusprotsesse.
Selle komponendi raames tehtavad investeeringud ja reformid aitavad täita 2020. ja 2019. aastal
Itaaliale esitatud riigipõhiseid soovitusi vajaduse kohta „parandada avaliku halduse tulemuslikkust,
sealhulgas investeerides avaliku sektori töötajate oskustesse, kiirendades digitaliseerimist ning
suurendades kohalike avalike teenuste tõhusust ja kvaliteeti“ (riigipõhine soovitus 3, 2019) ning
„keskenduda investeeringutele rohe- ja digipöördesse, eelkõige tugevdatud digitaristusse, et tagada
oluliste teenuste osutamine“ (riigipõhine soovitus 3, 2020).
Telg – Õigusküsimused: Nagu on märgitud Euroopa Komisjoni viimases aruandes õigusemõistmise
tõhususe kohta, on Itaalia kohtusüsteemi tulemuslikkus menetluste kestuse poolest teiste
liikmesriikide omast kaugel. Taaste- ja vastupidavuskava komponendi M1C1 telg 2 sisaldab
meetmeid, mille eesmärk on muuta kohtusüsteem tõhusamaks, lühendades menetluste kestust ja tuues
Itaalia ELi mediaanile lähemale. Selles komponendis käsitletakse 2020. ja 2019. aastal Itaaliale
esitatud riigipõhiseid soovitusi tsiviilkohtumenetluste kestuse lühendamise ja korruptsioonivastase
võitluse tulemuslikkuse parandamise kohta (riigipõhised soovitused 4, 2019 ja 4, 2020). Lisaks on
kohtusüsteemi digiteerimine oluline ka digiülemineku seisukohast.
Telg – Avalik haldus: Taaste- ja vastupidavuskava komponendi M1C1 telg 3 sisaldab meetmeid,
mille eesmärk on reformida Itaalia avalikku haldust ja parandada haldussuutlikkust. Itaalia on alla EL
27 keskmise nii valitsuse tõhususe kui ka usalduse poolest valitsuse vastu. Itaalia avaliku halduse
reforme mõjutas suur mahajäämus ülalt alla suunatud reformide rakendamisel ning väärtuslike alt üles
suunatud uuenduste vähene tunnustamine ja levitamine. Haldussuutlikkus on väga väike. Jätkata
tuleks jõupingutusi strateegilise planeerimise suutlikkuse, järelevalve- ja hindamismehhanismide ning
tõenduspõhiste poliitikakujundamise vahendite tugevdamiseks. Selle komponendi peamine eesmärk
on suurendada Itaalia kesk- ja kohaliku tasandi haldusasutuste haldussuutlikkust nii inimkapitali
(valik, pädevus ja karjäär) kui ka haldusmenetluste lihtsustamise osas. Selles osas tutvustatakse üldist
struktuurset personalistrateegiat, mis ulatub valikuprotsessidest karjäärivõimalusteni. Reform hõlmab
ka meetmeid menetluste lihtsustamiseks. Investeeringud uutesse digitaalsetesse töövahenditesse ja
tugevdatud meetmed elukestva õppe valdkonnas sisalduvad 1. ülesande 1. komponendis. Selle
komponendiga täidetakse 2020. ja 2019. aastal Itaaliale esitatud riigipõhiseid soovitusi avaliku
halduse tulemuslikkuse parandamise kohta (riigipõhised soovitused 3, 2019 ja 4, 2020).
2
Telg – Riigihanked ja administratsiooni maksed: Taaste- ja vastupidavuskava komponendi M1C1
telg 4 sisaldab meetmeid, mille eesmärk on reformida Itaalia riigihangete õigusraamistiku teatavaid
põhiaspekte ning vähendada kesk-, piirkondliku ja kohaliku tasandi haldusasutuste ning piirkondlike
tervishoiuasutuste hilinenud makseid. Reformi peamine eesmärk on lihtsustada riigihanke-eeskirju,
suurendada ettevõtjate õiguskindlust ja kiirendada riigihankelepingute sõlmimist, säilitades samal ajal
menetluslikud tagatised läbipaistvuse ja võrdse kohtlemise osas. Need reformid toetavad seega kavast
rahastatavate taristute ja projektide õigeaegset elluviimist.
Telg – Eelarve- ja struktuurireformid (maksustamine ja avaliku sektori kulutused): Taaste ja
vastupidavuse rahastamisvahendi komponendi M1C1 telg 5 hõlmab mitut reformi, mille eesmärk on
toetada Itaalia riigi rahanduse jätkusuutlikkust (riigipõhine soovitus 1, 2019). Tulude poolel on
reformide eesmärk parandada maksude kogumise protsessi, soodustada maksukuulekust ja võidelda
maksudest kõrvalehoidumise vastu, et vähendada maksumaksjate nõuete täitmisega seotud kulusid ja
suurendada valitsemissektori tulusid, aidates kaasa riigi rahanduse jätkusuutlikkuse parandamisele.
Kulude poolel on reformide eesmärk parandada avaliku sektori kulutuste tõhusust nii kesktasandil,
tugevdades olemasolevat iga-aastase kulude läbivaatamise raamistikku, kui ka piirkondlikul tasandil,
viies lõpule eri valitsustasandite eelarvesuhete reformi.
A.1. Tagastamatu rahalise toetusega seotud reformide ja investeeringute kirjeldus
Telg – Avaliku halduse digitaliseerimine
Investeering 1.1 – Digitaristu
Selle investeeringu eesmärk on tagada, et avaliku halduse süsteeme, andmekogumeid ja rakendusi
majutatakse andmekeskustes, mis vastavad kõrgetele turvalisuse, jõudluse, skaleeritavuse, Euroopa
koostalitlusvõime ja energiatõhususe kvaliteedistandarditele. Investeering seisneb avaliku halduse
andmekogumite ja rakenduste üleviimises avaliku teenuse võrgule või turvalistele sertifitseeritud
avaliku pilveteenuse osutajatele.
Investeering 1.2 – Pilvandmetöötluse võimaldamine kohaliku omavalitsuse jaoks
Selle investeeringu eesmärk on viia olulise osa kohalike haldusasutuste andmekogumid ja rakendused
üle turvalisse pilvetaristusse, mis annab igale haldusasutusele vabaduse valida sertifitseeritud avalike
pilvekeskkondade vahel.
Meetmega nähakse ette ka haldusasutustele suunatud rände kui teenuse toetuspakett, mis hõlmab
järgmist: i) esialgne hindamine, ii) jõupingutuste käivitamiseks vajalik menetluslik/halduslik tugi, iii)
läbirääkimised vajaliku välistoe üle ja iv) projekti üldine juhtimine selle elluviimise ajal.
Tehnoloogiliste uuenduste ja digiülemineku ministeeriumi (MITD) järelevalve all tegutsev meeskond
peaks tegema kindlaks ja sertifitseerima suure hulga kvalifitseeritud teenuseosutajaid ning pidama
läbirääkimisi standardsete toetuspakettide üle, mis on kohandatud haldusasutuste ja üleminekuga
seotud teenuste suurusele.
Investeering 1.3 – Andmed ja koostalitlusvõime
Selle investeeringu eesmärk on tagada peamiste andmekogumite ja teenuste täielik koostalitlusvõime
kesk- ja kohalike haldusasutuste vahel. Meede seisneb riikliku digitaalse andmeplatvormi
(Piattaforma Digitale Nazionale Dati) loomises, mis võimaldab andmekogumite koostalitlusvõimet
kesk- ja kohalike haldusasutuste vahel jagatavate rakendusliideste kataloogi kaudu.
Investeering 1.4 – Digiteenused ja kodanike kogemused
Selle investeeringu eesmärk on töötada välja digitaalsete avalike teenuste integreeritud ja kodanikele
suunatud ökosüsteem, tagada nende laialdane kasutuselevõtt kesk- ja kohalikes haldusasutustes ning
suurendada üldist kasutajakogemust.
3
Abinõu:
i) määratakse kindlaks korduskasutatavate teenuste osutamise mudelid, millega tagatakse
täielikud ligipääsetavusnõuded (investeering 1.4.1 – Kodanike kogemused – digitaalsete
avalike teenuste kvaliteedi ja kasutatavuse parandamine);
ii) suurendab digitaalsete avalike teenuste kättesaadavust (investeering 1.4.2 – Kodanike
kaasamine: Digitaalsete avalike teenuste juurdepääsetavuse parandamine);
iii) hõlmab kodanike ja haldusasutuste vaheliste maksete digitaalse rakenduse (PagoPa) ja
rakenduse „IO“ kasutuselevõttu (investeering 1.4.3 – PagoPA platvormiteenuste ja rakenduse
„IO“ kasutuselevõtt);
iv) toetab riiklike digiidentiteedi platvormide (Sistema Pubblico di Identità Digitale, SPID ja Carta
d’Identità Elettronica, CIE) ja riikliku registri (Anagrafe nazionale della popolazione residente,
ANPR) kasutuselevõttu (investeering 1.4.4 – riiklike digiidentiteedi platvormide (SPID, CIE) ja
riikliku registri (ANPR) ulatuslikum kasutuselevõtt);
v) luuakse ühtne teatamisplatvorm (investeering 1.4.5 – avalike teadaannete digitaliseerimine);
vi) hõlmab liikuvuse kui teenuse kasutuselevõttu (investeering 1.4.6 – Liikuvus kui Itaalia teenus,
kusjuures viimast meedet rahastatakse tagastamatust rahalisest toetusest).
Investeering 1.5 – Küberturvalisus
Selle investeeringu eesmärk on tugevdada Itaalia kaitset küberkuritegevusest tulenevate riskide eest,
eelkõige rakendades riiklikku küberturvalisuse perimeetrit kooskõlas võrgu- ja infosüsteemide
turvalisust käsitlevas direktiivis (EL) 2016/1148 (küberturvalisuse direktiiv) sätestatud turvanõuetega
ning tugevdades riiklikku küberkaitsesuutlikkust tehnilise kontrolli ja riskiseire valdkonnas.
Meetmega nähakse ette tipptasemel integreeritud süsteemi arendamine, mis ühendab tihedalt eri
üksusi kogu riigis ning ühendab rahvusvahelisel tasandil partnereid ja usaldusväärseid
tehnoloogiapakkujaid. See põhineb neljal sambal: i) tugevdada üldsuse ja ettevõtete/üksuste eesliini
suutlikkust hallata hoiatusi ja tegelikke avalikult tunnustatud sündmusi; ii) luua/tugevdada riigi
kontrolli- ja auditisuutlikkust riist- ja tarkvara puhul, mida kasutavad isikud, kellel on olulised
funktsioonid usaldusväärsuse/ennetavate ohtude tõendamiseks; iii) tugevdada politseijõudude
õiguskaitse- ja küberüksusi, kes vastutavad kuritegude uurimise eest; iv) Tugevdada märkimisväärselt
kübervara ja inimressursse, kes vastutavad riikliku julgeoleku ja küberohtudele reageerimise eest.
Investeering 1.6 – Suurte keskvalitsuste digiüleminek
Selle investeeringu eesmärk on suurendada peamiste keskasutuste – sealhulgas i) siseministeeriumi,
ii) justiitsministeeriumi, iii) riikliku sotsiaalkindlustusinstituudi (INPS) ja riikliku
tööõnnetuskindlustuse instituudi (INAIL), iv) kaitseministeeriumi, v) riiginõukogu ja vi)
finantspolitsei – tõhusust ja lihtsustada nende menetlusi. Investeering seisneb nende pädevusse
kuuluvate protsesside, tegevuste või teenuste kogumi ümberkujundamises või digiteerimises.
Investeering 1.7 – Põhilised digioskused
Selle investeeringu eesmärk on vähendada digiõppe pakkumise kaudu nende inimeste osakaalu, keda
ohustab digitaalne tõrjutus. Meede seisneb üksikisikute osalemises digitaalses avalikus teenistuses
ning digiõppes ja/või digitaalses hõlbustamises.
Reform 1.1 – IKT-hanked
Reformi eesmärk on tagada, et avalik haldus saaks hankida info- ja kommunikatsioonitehnoloogia
(IKT) lahendusi õigeaegsemalt ja tõhusamalt, ühtlustades ja kiirendades IKT-teenuste ja -varade
hankeprotsessi.
4
Reformi rakendamine koosneb kolmest tegevussuunast. Esiteks luuakse ühtne andmebaas, mis
sisaldab valget nimekirja ettevõtjatest, kellel on õigus pakkuda kaupu ja teenuseid haldusasutustele,
ning luuakse spetsiaalne tehnoloogiline taristu, et võimaldada tarnijate sertifitseerimist. Teiseks
võetakse vastu lihtsustatud lähenemisviis (kiirmenetlus) info- ja kommunikatsioonitehnoloogia ostude
ühtlustamiseks broneeringuinfo projektide puhul. Kolmandaks luuakse digitaalne hanketeenus, mille
eesmärk on i) hõlmata ainult sertifitseeritud tarnijaid (ettevõtjad võivad igal ajal taotleda
sertifitseerimist kooskõlas direktiivi 2014/24/EL artikliga 64); ii) võimaldavad kiiresti kindlaks teha
konkreetsele vajadusele vastavad tarnijad (nt konfiguraatori kaudu); iii) pakkuda haldusasutustele
intuitiivset kasutajakogemust (nt pakutavate teenuste selge kirjeldus, tarnijate võrdlev hindamine).
See üldine ülesehitus tugineb Itaalia riigihangetega tegeleva riigiasutuse CONSIP olemasolevale
suutlikkusele.
Reform 1.2 – Üleminekutoetus
Reformi eesmärk on toetada kõigi kesk- ja kohalike haldusasutuste digipööret spetsiaalse digitaalse
avaliku halduse ümberkujundamise büroo loomise kaudu. Ümberkujundamisbüroo koosneb ajutisest
tehnoloogia valdkonnas pädevast ressursireservist, mis korraldab ja toetab migratsioonialaseid
jõupingutusi ning tsentraliseeritud läbirääkimisi sertifitseeritud välistoetuse „pakettide“ üle.
Lisaks nähakse meetmega ette tarkvaraarendusele ja operatiivjuhtimisele keskenduva ettevõtte
loomine, et toetada keskvalitsuste digitaalset kasvu. Ümberkujundamisbüroo toetab eelkõige avalikku
haldust selle komponendi alla kuuluvate investeeringute 1.1–1.7 rakendamisel ning toetab ka 6.
missiooni alla kuuluvate tervishoiu digiülemineku investeeringute ja reformide rakendamist.
Reform 1.3 – „Kõigepealt pilvandmetöötlus ja koostalitlusvõime“
Reformi eesmärk on kõrvaldada takistused pilvandmetöötluse kasutuselevõtult ja ühtlustada
bürokraatiat, mis aeglustab haldusasutuste vahelisi andmevahetusprotsesse, kehtestades stiimulid ja
kohustused, mille eesmärk on hõlbustada üleminekut pilvandmetöötlusele ja kõrvaldada
menetluslikud piirangud digiteenuste laialdasel kasutuselevõtul.
Reform hõlmab kolme tegevussuunda. Esiteks, kuna pilvelahendused suurendavad info- ja
kommunikatsioonitehnoloogia (IKT) kulutuste kulutõhusust pärast eelnevalt kindlaks määratud
ajapikendust (nt kolm aastat pärast ümberkujundamise algust), peavad haldusasutused, kes ei järginud
pilvandmetöötluse ümberkujundamist, nägema oma IKT kulutuste eelarves piiranguid.
Teiseks vaadatakse pilvandmetöötlusele ülemineku stiimulite osana läbi kehtivad avaliku sektori
raamatupidamiseeskirjad pilvteenustega seotud kulude kohta. Arvestades, et pilvandmetöötlusele
üleminek hõlmab praegu eelarvete ülekandmist kapitalikuludelt tegevuskuludele, vaadatakse läbi
avaliku sektori raamatupidamiseeskirjad pilveteenustega seotud kulude kohta, et mitte pärssida
avaliku halduse asutuste jaoks pilvandmetöötlusele üleminekut.
Kolmandaks vaadatakse läbi andmete koostalitlusvõime eeskirjadega seotud normid kooskõlas
avaandmeid ja isikuandmete töötlemist käsitlevate sätetega ning lihtsustatakse kehtivaid
haldusasutustevahelise andmevahetuse menetlusi, et ühtlustada menetluslikke aspekte ja kiirendada
haldusasutuste andmebaaside koostalitlusvõime rakendamist. Lisaks vaadatakse läbi digitaalne
asukoht ja integreeritakse see riiklikusse elanikeregistrisse (ANPR), et võimaldada teatavat ja turvalist
digitaalset suhtlust kodanike ja haldusasutuste vahel.
Telg – Õigusküsimused
Reform 1.4 – Tsiviilõigus
5
Reformi eesmärk on lühendada tsiviilkohtumenetluste kestust ja vähendada tsiviilkohtute
mahajäämust. Reform seisneb seadusandlike meetmete vastuvõtmises, et vähendada sissetulevate
kohtuasjade arvu, lihtsustada olemasolevaid menetlusi ja suurendada kohtute tootlikkust.
Reform 1.5 – Kriminaalõigus
Reformi eesmärk on lühendada kriminaalmenetluste kestust. Reform seisneb meetmete võtmises, mis
lihtsustavad olemasolevaid menetlusi ja suurendavad kohtute tootlikkust.
Reform 1.6 – Maksejõuetus
Reformi eesmärk on digitaliseerida ja tõhustada maksejõuetusmenetlusi, võttes kasutusele varajase
hoiatamise mehhanismid enne maksejõuetust, kohtute ja kohtueelsete asutuste spetsialiseerumise
maksejõuetusmenetluste kõigi etappide tõhusamaks haldamiseks, sealhulgas kohtu- ja haldusasutuste
liikmete koolitamise ja spetsialiseerumise kaudu.
Reform 1.7 – Maksukohtud
Reformi eesmärk on tõhustada maksuõiguse jõustamist ja vähendada kassatsioonikohtule esitatavate
apellatsioonkaebuste suurt arvu.
Reform 1.8 – Kohtusüsteemi digitaliseerimine
Reformi eesmärk on digiteerida tsiviil- ja kriminaalmenetlused. Reform hõlmab dokumentide
kohustusliku elektroonilise esitamise kehtestamist, tsiviilkohtumenetluste elektroonilise töövoo
loomist, esimese astme kriminaalmenetluste digiteerimist ja tsiviilõiguslike otsuste andmebaasi
loomist.
Investeering 1.8 – Tsiviil-, kriminaal- ja halduskohtute värbamismenetlused
Meetme eesmärk on parandada õigusemõistmise kvaliteeti, toetades haldus-, tsiviil- ja
kriminaalkohtute ning justiitsministeeriumi territoriaalsete ja kesktalituste tegevust, kes vastutavad
taaste- ja vastupidavuskava täitmise tagamise ja kohtusüsteemi digiülemineku eest. Investeering
seisneb kohtukantselei töötajate ning taaste- ja vastupidavuskava eesmärkide rakendamist toetavate
tehniliste ja haldustöötajate ajutises töölevõtmises.
6
Telg – Avalik haldus
Reform 1.9 – Riikliku tööhõive reform ja lihtsustamisreform
Reformi eesmärk on tugevdada riiklikku tööhõiveraamistikku ja lihtsustada haldusmenetlusi
ettevõtjate ja kodanike hüvanguks. Reform seisneb mitme meetme vastuvõtmises, millega kaotatakse
tarbetud kohustused, võetakse kasutusele vaikiva nõusoleku mehhanismid, lihtsustatakse
teabevahetust, ühtlustatakse piirkondade ja omavalitsustega jagatavat korda, tehakse Sportello Unico
Attività Produttive (SUAP) ja Sportello Unico Edilizia (SUE) andmed kättesaadavaks digiplatvormil
www.impresainungiorno.gov.it ning määratakse kindlaks peamised tulemusnäitajad, et suunata
organisatsioonilisi muutusi haldusasutustes.
Reform 1.9a – Reform ühtekuuluvuspoliitika rakendamise kiirendamiseks
Reformi eesmärk on kiirendada ühtekuuluvuspoliitika rakendamist ja tõhusust vastastikuses
täiendavuses riiklike taaste- ja vastupidavuskavadega. Selles nähakse ette ühtse erimajandustsooni
strateegilise kava heakskiitmise kuupäev. Siseriiklike õigusaktide kohaselt on enne ühtse konverentsi
seaduseks muutmist vaja selle arvamust, nagu on sätestatud seadusandlikus dekreedis nr 281/1997.
Vastavalt määruse (EL) 2021/241 artiklile 9 võib reform saada toetust muudest liidu programmidest ja
vahenditest, tingimusel et sellise toetusega ei kaeta samu kulusid. Taaste- ja vastupidavusrahastust ei
kaeta reformiga seotud kulusid.
Investeering 1.9 – Tehnilise abi andmine ja suutlikkuse suurendamine Itaalia taaste- ja
vastupidavuskava rakendamiseks
Selle investeeringu eesmärk on tugevdada haldussuutlikkust Itaalia taaste- ja vastupidavuskava
rakendamiseks. Investeering seisneb ekspertide reservi ajutises värbamises, et anda haldusasutustele
tehnilist abi ja suurendada nende suutlikkust rakendada taaste- ja vastupidavuskava raames
kavandatud konkreetseid algatusi, ning hõlmab koolitusprogramme.
Telg – Riigihanked ja riigiasutuste maksed
Reform 1.10 – Riigihangete õigusraamistiku reform
Reformi eesmärk on parandada avaliku sektori hankijate kvalifikatsiooni ja professionaalsust,
suurendada konkurentsi, lihtsustada ja digitaliseerida kesksete hankijate menetlusi ning võtta
kasutusele riiklik e-riigihangete süsteem. Selleks hõlmab reform õigusaktide vastuvõtmist, sealhulgas
riigihangete seadustiku muutmist.
Reform 1.11 – Haldus- ja tervishoiuasutuste hilinenud maksete vähendamine
Reformi eesmärk on kõrvaldada kitsaskohad, mis põhjustavad viivitusi Itaalia kesk-, piirkondliku,
kohaliku ja tervishoiuvaldkonna haldusasutuste ja ametiasutuste poolt ettevõtjatele tehtavate maksete
tegemisel, eelkõige struktuurimeetmete ja sihipäraste seadusandlike meetmete vastuvõtmise kaudu.
7
Telg – Eelarve- ja struktuurireformid (maksustamine ja avaliku sektori kulutused)
Reform 1.12 – Maksuhalduse reform
Selle maksuhalduse reformi eesmärk on soodustada maksukuulekust, suurendada auditite ja
kontrollide tõhusust ning vähendada maksumaksjate nõuete täitmisega seotud kulusid sihipäraste
seadusandlike ja regulatiivsete meetmete vastuvõtmise ja jõustamise kaudu.
Reform 1.13 – Kulude läbivaatamise raamistiku reform
Reformi eesmärk on suurendada riiklike kulutuste läbivaatamise raamistiku tõhusust. Reform seisneb
kohustuses vaadata ajavahemikul 2023–2025 igal aastal kulud läbi ning parandada rohelise ja
sooteadliku eelarvestamise tava.
Reform 1.14 – Kohaliku ja piirkondliku eelarveraamistiku reform
Reformi eesmärk on suurendada eelarvesuhete läbipaistvust eri valitsustasanditel. Reform hõlmab
„fiskaalföderalismi“ teenuste oluliste tasemete määratlemist piirkondades, millel on tavaline staatus
vähemalt kahes poliitikavaldkonnas, ning selliste õigusaktide vastuvõtmist, milles määratletakse
„fiskaalföderalism“ provintside ja suurlinnade jaoks.
Reform 1.15 – Avaliku sektori raamatupidamiseeskirjade reform
Reformi eesmärk on rakendada avaliku sektori jaoks ühtne tekkepõhine raamatupidamissüsteem,
millest on maha arvatud riigi omanduses olevad ettevõtted. Reform seisneb kontseptuaalse raamistiku,
tekkepõhise raamatupidamisarvestuse standardite ja mitmemõõtmelise kontoplaani vastuvõtmises
ning uuele tekkepõhisele raamatupidamissüsteemile üleminekuks koolituste korraldamises.
Investeering 1.10 – Kvalifikatsiooni ja e-riigihangete toetamine
Selle investeeringuga luuakse avaliku sektori hankijate kutseliseks muutmise strateegia raames
hangete tugifunktsioon, mis on ette nähtud avaliku sektori hankijatele, et täita riigihankeseadustiku II
lisa punkti 4 nõudeid ja toetada neid e-riigihangete protsessis, toetades digioskuste omandamist ja
pakkudes tehnilist tuge riigihangete digitaliseerimise vastuvõtmisel, sealhulgas dünaamiliste
hankesüsteemide kasutamisel.
8
A.2. Tagastamatu rahalise toetuse eesmärgid, sihid, näitajad ning seire ja rakendamise ajakava
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
M1C1–1 Reform 1.1: IKT-
hanked Eesmärk
Reformi 1.1 „IKT
hanked“
käsitlevate
dekreet-
seaduste
jõustumine
Seaduse säte, mis
viitab IKT hangete
reformi käsitleva
dekreetseaduse
jõustumisele
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2021
Vajalikud õigusaktid hõlmavad
seadusandlikke sekkumisi lihtsustusi
käsitlevasse dekreeti (Decreto Legge
Semplificazioni). Nendes sätestatakse:
i) Võimalus kasutada riigihankelepingute
seadustiku artikli 48 lõikes 3 osutatud
menetlust ka riigihankelepingute puhul,
mis ületavad riigihankelepingute
seadustiku artiklis 35 osutatud
piirmäärasid, ostude puhul, mis on seotud
eelkõige pilvetehnoloogial põhinevate
arvutikaupade ja -teenuste ning
ühenduvusteenuste ostmisega, mida
rahastatakse täielikult või osaliselt
broneeringuinfo määruse projektide
rakendamiseks ette nähtud vahenditest;
ii) Koostalitlusvõime erinevate
andmebaaside vahel, mida haldavad
sertifitseerimisasutused, kes osalevad
riigihangete seadustiku artiklis 80
osutatud nõuete kontrollimise protsessis;
iii) Sellise ettevõtjate virtuaalse toimiku
loomine, milles on esitatud andmed artiklis
80 osutatud kõrvalejätmise põhjuste
puudumise kontrollimiseks, mis võimaldab
koostada valge nimekirja ettevõtjatest,
keda on juba kontrollitud.
9
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
M1C1–2
Reform 1.3:
Pilvandmetöötlu
se esikohale
seadmine ja
koostalitlusvõim
e
Eesmärk
Reformi 1.3
„Kõigepealt
pilvandmetöötlus
ja
koostalitlusvõim
e“ käsitlevate
dekreet-
seaduste
jõustumine
Seaduse säte, mis
viitab esimese
pilvandmetöötluse
ja
koostalitlusvõime
reformi käsitleva
dekreetseaduse
jõustumisele
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2021
Vajalikud õigusaktid hõlmavad järgmist:
Rakendusaktid, mis käsitlevad eelkõige i)
Agenzia per l’Italia digitale (AgID) määrust
Polo Strategico Nazionale (PSN) kohta
(sätestatud dekreetseaduse 179/212
artiklis 33-septies) ja ii) AgID suuniseid
koostalitlusvõime kohta (sätestatud
Codice dell’Amministrazione Digitale
(CAD) artiklites 50 ja 50b).
CAD artikli 50 muudatused:
i) riiklikele digitaalsetele
andmeplatvormidele juurdepääsu
omavate asutuste raamlepingute
sõlmimise kohustuse kaotamine;
ii) selgitused eraelu puutumatuse kohta:
andmete edastamine ühest infosüsteemist
teise ei muuda andmete omandiõigust
ega töötlemist, ilma et see piiraks
andmeid vastu võtvate ja töötlevate
haldusasutuste kohustusi sõltumatute
vastutavate töötlejatena.
Decreto del Presidente della Repubblica
(DPR) 445/2000 muudatused seoses
andmetele juurdepääsuga:
i) andmetele otsese juurdepääsu
saamiseks nõutava loa kehtetuks
10
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
tunnistamine;
ii) artiklis 72 jäetakse välja viide
raamlepingutele.
Dekreetseaduse 179/2012 artikli 33-
septies muudatused:
i) anda AgIDile võimalus reguleerida
Centri Elaborazione Dati (CED) ja Cloud
Regulations’iga tingimusi ja meetodeid,
millega haldusasutused peavad CED-le
üle minema;
ii) kehtestada karistused pilvele ülemineku
kohustuste täitmata jätmise eest.
M1C1–3 Investeering 1.1:
Digitaristu Eesmärk
Polo Strategico
Nazionale (PSN)
programmi
lõpuleviimine
Tehnoloogiliste
uuenduste ja
digiülemineku
ministeeriumi
(MITD) aruanne
pilvandmetöötluse
kasutuselevõtu
kohta
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2022
Kogu projekt on täielikult lõpule viidud, kui
kõik sihtrühma kuuluvad haldusasutused
on lõpetanud kindlaksmääratud riiulite
liikumise Polo Strategico Nazionale (PSN)
suunas ja nelja andmekeskuse testimine
on edukalt lõpule viidud, mis võimaldab
alustada sihtrühma kuuluvate
haldusasutuste andmekogumite ja
rakenduste migreerimist PSNi.
M1C1–4
Investeering
1.3.1: Riiklik
digitaalne
andmeplatvorm
Eesmärk
Toimib riiklik
digitaalne
andmeplatvorm
Tehnoloogilise
innovatsiooni ja
digiülemineku
ministeeriumi
(MITD) aruanne,
mis näitab riikliku
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2022
Platvorm võimaldab asutustel:
– avaldama oma rakendusliidesed
platvormi rakendusliideste kataloogis;
– koostab ja allkirjastab platvormi kaudu
11
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
digiandmeplatvorm
i käivitamist
digitaalse koostalitlusvõime lepingud;
– autendib rakendusliidesed ja annab
neile juurdepääsu platvormi funktsioonide
abil;
– valideerida ja hinnata vastavust riiklikule
koostalitlusvõime raamistikule.
M1C1–5
Investeering 1.5:
Küberturvalisuse
ni
Eesmärk
Uue riikliku
küberturvalisuse
ameti loomine
Halduslik
põhiseadus PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2022
Vahe-eesmärk saavutatakse 1) riikliku
küberturvalisuse ameti moodustava
dekreetseaduse (mis on praegu
viimistlemisel) muutmisega seaduseks; 2)
riigi ametlikus väljaandes avaldatakse
peaministri dekreet (Decreto del
Presidente del Consiglio dei Ministri,
DPCM), mis sisaldab riikliku
küberturvalisuse ameti sise-eeskirju.
M1C1–6
Investeering 1.5:
Küberturvalisuse
ni
Eesmärk
Riiklike
küberturvalisuse
teenuste
esialgne
kasutuselevõtt
Aruanne, mis
näitab riiklike
küberturvalisuse
teenuste täielikku
ülesehitust
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2022
Vahe-eesmärgi saavutamiseks
määratakse kindlaks riikliku
küberturvalisuse arhitektuuri kogu
ökosüsteemi üksikasjalik ülesehitus (st
riiklik teabe jagamise ja analüüsimise
keskus (ISAC), infoturbeintsidentidega
tegelevate rühmade (CERTid) võrgustik,
riiklik HyperSOC, kõrgjõudlusega
andmetöötlus, mis on integreeritud
tehisintellekti/masinõppe vahenditega, et
analüüsida riikliku tasandi
küberturvalisuse intsidente).
12
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
M1C1–7
Investeering 1.5:
Küberturvalisuse
ni
Eesmärk
Küberturvalisuse
kontrolli- ja
sertifitseerimisla
borite võrgustiku
käivitamine
Esitatud
dokumendid, mis
tõendavad
kindlaksmääratud
protsesse ja
menetlusi, mida
jagatakse laborite
vahel, ning
esitatud aruanded,
mis tõendavad
vähemalt ühe
labori aktiveerimist
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2022
Vahe-eesmärk saavutatakse:
i) Riiklik küberturvalisuse amet määrab
kindlaks, kus sõeluuringu- ja
sertifitseerimislaborid ja -keskused
luuakse, värvatavate ekspertide profiilid
ning laborite vahel jagatavate protsesside
ja menetluste täieliku määratluse.
ii) Ühe labori aktiveerimine.
Kontrollilaborite loomiseks ja
aktiveerimiseks loodud tegevuste üle teeb
järelevalvet Ministero dello Sviluppo
Economico (MISE) koos CVCNiga (riiklik
küberturvalisuse kontrolli ja
sertifitseerimise labor) ning
siseministeerium ja kaitseministeerium
integreerivad need hindamiskeskusega
(CV).
M1C1–8
Investeering 1.5:
Küberturvalisuse
ni
Eesmärk
PSNC ja võrgu-
ja infoturbe
turvameetmete
auditi
kesküksuse
aktiveerimine
Esitatud aruanded,
mis tõendavad
auditi kesküksuse
tegevuse
alustamist
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2022
Riikliku küberturvalisuse ameti juurde
määratakse siseüksus, kellel on volitused
täita PSNC ja võrgu- ja infoturbe
turbemeetmete eest vastutava auditi
kesküksuse ülesandeid.
Protsessid, logistika ja tegevuskord
vormistatakse asjakohaste
dokumentidena, pöörates erilist
tähelepanu tegevusprotsessidele, st
kaasamis-, auditeerimis- ja
13
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
aruandluskorrale.
IT-vahendid koguvad, haldavad ja
analüüsivad auditiandmeid ning need
töötab välja ja neid kasutab auditiüksus.
Esitatakse dokumendid, milles antakse
aru vahendite väljatöötamise
lõpuleviimisest.
M1C1–9
Investeering 1.5:
Küberturvalisuse
ni
Siht
Turvastruktuurid
e
ajakohastamise
toetamine T1
PUUDUVAD Number 0 5 4. kv 2022
Vähemalt viis tugevdavat sekkumist,
millega ajakohastatakse riikliku
küberturbeala (PSNC) ning võrgu- ja
infosüsteemide (NIS) sektorites lõpule
viidud turvastruktuure.
Sekkumisliigid hõlmavad turvakeskuste
ajakohastamist, küberpiiride kaitse
parandamist ning siseseire- ja
kontrollisuutlikkust. Sekkumised
keskenduvad tervishoiu-, energeetika- ja
keskkonnasektorile (joogiveevarustus).
M1C1–10
Reform 1.2:
Ümberkujundami
stoetus
Eesmärk
Ümberkujundami
srühma ja uue
koordineerimisük
suse loomise
jõustumine
Õigusakti säte,
milles osutatakse
ümberkujundamisa
meti loomist
käsitleva õigusakti
jõustumisele ja
uue
tegevusjuhendi
loomist käsitleva
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2022
Ümberkujundamisbüroo loomiseks
vajalikud õigusaktid hõlmavad järgmist:
- Dekreet-seaduse „reclutamento“ avaldamine (juba ministrite nõukogu poolt 4. juunil 2021 heaks kiidetud ja 10. juunil 2021 Euroopa Liidu Teatajas (Gazzetta Ufficiale) avaldatud);
14
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
õigusakti
jõustumisele
- Osalemiskutse avaldamine;
- Ekspertide valimine ja määramine (ajutiselt taaste- ja vastupidavusrahastu kestuse ajaks).
Uue tegevusjuhendi puhul on vajalikud
järgmised põhietapid:
- Seadusandlik luba;
- Decreto del Presidente del Consiglio dei Ministri (DPCM), millega antakse luba äriühingu asutamiseks ning määratakse kindlaks äriühingu eesmärgid, aktsiakapital, kestus ja juhatuse liikmed;
- Notariaalselt tõestatud äriühingu asutus;
- Äriühingu toimimiseks vajalikud aktid – põhikiri ja mitmesugused eeskirjad.
M1C1–11
Investeering
1.6.6:
Finantspolitsei
digiteerimine
Siht
Finantspolitsei –
erialaste
andmeteadustee
nuste ostmine
T1
PUUDUVAD Number 0 5 1. kv 2023
Professionaalsete andmeteadusteenuste
ostmine, sõlmides lepingu
konsultatsiooniteenuse osutajaga, kes
hõlmab kokku viit töötajat, kes vastutavad
nii suurandmete analüüsi üksuse
andmearhitektuuri kavandamise kui ka
algoritmide kirjutamise eest.
Andmeteadusteenuste ostmiseks sõlmitud
lepingu avaldamine kooskõlas põhimõtte
„ei kahjusta oluliselt“ tehniliste suunistega
(2021/C58/01), kasutades
15
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
välistamisnimekirja ning nõuet järgida
asjakohaseid ELi ja riiklikke
keskkonnaalaseid õigusakte, ning
esimese analüüsimooduli (IT-tuumik) uute
vahendite avaldamine kogu riigis.
M1C1–12
Investeering
1.3.2:Ühtne
digivärav
Siht Ühtne digivärav PUUDUVAD Number 0 19 4. kv 2023
Itaalias kohaldatavad 19 prioriteetset
haldusmenetlust 21st, mis on määratletud
ELi määruses (EL) 2018/1724, vastavad
täielikult ELi määruse (EL) 2018/1724
artiklis 6 sätestatud nõuetele. Täpsemalt:
a) kasutajate tuvastamine, teabe ja
täiendavate tõendite esitamine,
allkirjastamine ja lõplik esitamine toimub
elektrooniliselt vahemaa tagant
teenusekanali kaudu, mis võimaldab
kasutajatel täita menetlusega seotud
nõudeid kasutajasõbralikul ja
struktureeritud viisil; b) kasutajatele
antakse automaatne vastuvõtuteatis, välja
arvatud juhul, kui menetluse tulemus
edastatakse viivitamata; C) menetluse
tulemus edastatakse elektrooniliselt või
kui see on vajalik kohaldatava liidu või
liikmesriigi õiguse järgimiseks, siis
füüsiliselt; d) kasutajatele edastatakse
elektrooniline teade menetluse
lõpuleviimise kohta.
M1C1–13 Investeering Eesmärk Liikuvus kui
teenuselahendu
Ministero delle
Infrastrutture e PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2023 Ellu on viidud kolm katseprojekti, mille
eesmärk on katsetada liikuvust kui
16
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
1.4.6:
Liikuvus kui
Itaalia teenus
sed M1 della Mobilità
Sostenibili (MIMS)
aruanne koostöös
ülikoolidega, milles
kirjeldatakse
kolme
katseprojekti
rakendamist ja
hinnatakse nende
tulemusi
teenuselahendust tehnoloogiliselt
arenenud suurlinnades.
Iga lahendust on katseperioodil kasutanud
vähemalt 1 000 kasutajat.
Iga katseprojekt on avatud vähemalt
1 000 kasutajale, kellel on sellele
juurdepääs vabatahtlikkuse alusel ja oma
kulul ning kes annavad individuaalse
hinnangu koos võimalusega valida ja osta
liikuvusteenuseid platvormil
kättesaadavate teenuste hulgast.
MaaSi teenus pakub ühtse tehnoloogilise
platvormi kaudu kodanikust kasutajale
tema vajadustel põhinevat parimat
reisilahendust, kasutades ära erinevate
olemasolevate liikuvusvõimaluste (kohalik
ühistransport, ühiskasutus, kabiin,
autorent) integreerimist, et optimeerida
reisikogemust nii planeerimise
(ühendveomarsruutide planeerija ning
reaalajas teave aegade ja vahemaade
kohta) kui ka kasutamise (teenuste
broneerimine ja maksmine) seisukohast.
M1C1–14a
Reform 1.9a:
Reform
ühtekuuluvuspoli
itika
rakendamise
Eesmärk
Ühtekuuluvuspol
iitika
rakendamise
kiirendamist
käsitlevate
Seaduse säte, mis
viitab siseriiklike
õigusaktide
jõustumisele, et
kiirendada
PUUDUVAD PUUDUVAD PUUDUVAD 1. kv 2024
Selliste siseriiklike õigusaktide jõustumine,
milles määratakse partnerluslepingu ja
kõigi praeguste programmide raames
kindlaks ühtekuuluvuspoliitika
rakendamise kiirendamiseks ja
17
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
kiirendamiseks siseriiklike
õigusaktide
jõustumine
ühtekuuluvuspoliiti
ka rakendamist
parandamiseks vajalik kord.
Selleks et tagada institutsiooniline dialoog
ja koostöö ning ühine arusaam vajalikest
meetmetest, moodustab valitsus 31.
detsembriks 2023 kõigi Cabina di regia
PNRRi piirkondlike ja riiklike programmide
korraldusasutustega tehnilise töörühma,
ilma et see piiraks ühtset konverentsi
käsitlevate siseriiklike õigusaktide
kohaldamist.
Õigusaktides sätestatakse järgmistes strateegilistes sektorites sekkumiste prioriseerimiseks vajalik kord, mis on rangelt kooskõlas asjaomaste eeltingimuste jaoks kindlaks määratud planeerimisdokumentidega, ning nende konkreetne rakendamine, sealhulgas sekkumine konkreetselt haldussuutlikkuse tugevdamiseks nendes sektorites: – Vee – hüdrogeoloogilise riski ja keskkonnakaitse taristud; – Jäätmed; – Transport ja säästev liikuvus; – Energiatööstus, – Ettevõtluse arendamise ja atraktiivsuse toetamine, sealhulgas digi- ja rohepöörde jaoks.
M1C1–15 Investeering
1.6.6: Siht Finantspolitsei –
erialaste PUUDUVAD Number 5 10 1. kv 2024 Professionaalsete andmeteadusteenuste
ostmine, sõlmides lepingu
18
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
Finantspolitsei
digiteerimine
andmeteadustee
nuste ostmine
T2
konsultatsiooniteenuse osutajaga, kes
hõlmab viit täiendavat inimressurssi
(kokku kümmet), kes vastutavad nii
suurandmete analüüsi üksuse
andmearhitektuuri kavandamise kui ka
algoritmide kirjutamise eest.
Andmeteadusteenuste ostmiseks sõlmitud
lepingu avaldamine kooskõlas põhimõtte
„ei kahjusta oluliselt“ tehniliste suunistega
(2021/C58/01), kasutades
välistamisnimekirja ning nõuet järgida
asjakohaseid ELi ja riiklikke
keskkonnaalaseid õigusakte, ning
esimese analüüsimooduli (IT-tuumik) uute
vahendite avaldamine kogu riigis.
M1C1–17 Investeering 1.1:
Digitaristu Siht
Migratsioon Polo
Strategico
Nazionalesse T1
PUUDUVAD Number 0 100 3. kv 2024
Vähemalt 100 avaliku halduse
keskasutust ja kohalikku tervishoiuasutust
(Aziende Sanitarie Locali/Aziende
ospedaliere) viivad vähemalt ühe
haldusteenuse (süsteemid, andmekogum
ja rakendused kaasa arvatud) täielikult üle
taristusse (Polo Strategico Nazionale).
Täielikult migreerumine võib tähendada,
et iga institutsioon koosneb järgmistest
osadest: ei ole pilvandmetöötluseks
valmis üksnes majutuse, lifti ja
vahetusega seotud üleminekute, taristu
kui teenuse (IaaS), platvormi kui teenuse
(Paas) või tarkvara kui teenuse (SaaS)
19
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
ajakohastamise puhul. Üleminek Polo
Strategico Nazionalelele võib toimuda eri
viisidel vastavalt kohapealse tarkvara IT-
arhitektuuri tehnika tasemele, mis kuulub
igale üleminevale avalikule haldusele.
Need strateegiad võivad ulatuda
pilvevalmiduseta tarkvara puhtalt
majutusest ning üles- ja
ümbersuunamistest kuni pilvevalmidusega
tarkvara üleminekuni IaaSile, PaaSile või
SaaSile. PSN pakub igale rändavale
avalikule haldusele kõiki
rändestrateegiaid, mille puhul võib
eeldada, et eesmärk „migratsioon Polo
Strategico Nazionalesse“ on saavutatud.
Kohaldamisalasse kuuluvad
haldusasutused kokku hõlmavad järgmist:
• Avaliku halduse keskasutused (näiteks
riiklik sotsiaalkindlustusamet ja
justiitsministeerium), kelle arvele langeb
suurim osa info- ja
kommunikatsioonitehnoloogia (IKT)
kulutustest;
• Avaliku halduse keskasutused, kes
majutavad andmeid aegunud
andmekeskustes vastavalt hiljuti
pilvevalmiduse kohta tehtud uuringule;
20
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
• Peamiselt Kesk- ja Lõuna-Itaalias
asuvad kohalikud tervishoiuasutused
(Aziende Sanitarie Locali/Aziende
Ospedaliere), kellel puudub piisav taristu
andmeturbe tagamiseks.
M1C1–18
Investeering
1.3.1: Riiklik
digitaalne
andmeplatvorm
Siht
Rakendusliidese
d riiklikul
digitaalsel
andmeplatvormil
T1
PUUDUVAD Number 0 3 000 4. kv 2024
Eesmärk on jõuda vähemalt 3 000
rakendusliideseni, mille on loonud
haldusasutused ja mis on avaldatud
rakendusliideste kataloogis ja
integreeritud riikliku
digiandmeplatvormiga. Avaldatud
rakendusliidesed mõjutavad mitut
valdkonda, mis võivad hõlmata muu
hulgas järgmist:
i) Sotsiaalkindlustus- ja
hoolekandeteenused, hanketeenuste
haldamine või riiklikud põhiregistrid (nt
rahvastikuregister ja autolubade register);
Iga rakendusliidese rakendamine ja
dokumentatsioon peab vastama riiklikele
koostalitlusvõime standarditele. Riikliku
digiandmeplatvormi raamistik pakub
funktsioone selle vastavuse hindamiseks.
M1C1–19
Investeering 1.5:
Küberturvalisuse
ni
Siht
Toetus T2
turvastruktuuride
ajakohastamisek
s
PUUDUVAD Number 5 50 4. kv 2024
Vähemalt 50 tugevdavat sekkumist riikliku
küberturbeperimeetri ning võrgu- ja
infosüsteemide valdkonnas.
Sekkumisliikide hulka kuuluvad näiteks
21
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
turvakeskused, küberpiiride kaitse
parandamine ning siseseire ja -kontrolli
suutlikkus kooskõlas võrgu- ja infoturbe
ning füüsilise julgeoleku ja koostöö
võrgustiku nõuetega. Sekkumised võrgu-
ja infoturbe sektorites keskenduvad
eelkõige tervishoiu-, energeetika- ja
keskkonnasektorile (joogiveevarustus ja
jäätmekäitlus).
M1C1–20
Investeering 1.5:
Küberturvalisuse
ni
Eesmärk
Riiklike
küberturvalisuse
teenuste täielik
kasutuselevõtt
Aruanne, mis
tõendab riiklike
küberturvalisuse
teenuste täielikku
aktiveerimist
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2024
Selle vahe-eesmärgi saavutamiseks
aktiveeritakse territoriaalsed
infoturbeintsidentidega tegelevad rühmad
(CERTid), mis ühendatakse Itaalia
küberturbe intsidentide lahendamise
üksusega (CSIRT), aktiveeritakse teabe
jagamise ja analüüsimise keskus (ISAC),
integreeritakse vähemalt viis
infoturbekeskust riikliku HyperSOCiga
ning tagatakse küberturvalisuse
riskijuhtimisteenuste, sealhulgas
tarneahela analüüsi ja küberriski
kindlustusteenuste täielik toimimine.
M1C1–21
Investeering 1.5:
Küberturvalisuse
ni
Eesmärk
Küberturvalisuse
kontrolli- ja
sertifitseerimisla
borite võrgustiku
ja
hindamiskeskust
e
Esitatud aruanded,
mis tõendavad
vähemalt kümne
labori ja kahe
hindamiskeskuse
täielikku
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2024 Aktiveeritakse vähemalt 10 sõeluuringu- ja
sertifitseerimislaborit ning 2
hindamiskeskust.
22
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
väljakujundamin
e
aktiveerimist
M1C1–22
Investeering 1.5:
Küberturvalisuse
ni
Eesmärk
PSNC ja võrgu-
ja infoturbe
turvameetmete
auditi
kesküksuse
täielik toimimine,
kusjuures lõpule
on viidud
vähemalt 30
kontrolli
Esitatud aruanded,
kontrolliaruanded PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2024
Auditi kesküksuse täielik toimimine,
kusjuures lõpule on viidud vähemalt 30
kontrolli.
M1C1–23
Investeering
1.4.6: Liikuvus
kui Itaalia teenus
Eesmärk
Liikuvus kui
teenuselahendu
sed M2
Liikuvus kui
teenuste
katseprojekt
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2025
Seitse katseprojekti, millest vähemalt kolm
on lõunapoolsed, katsetavad liikuvuse kui
teenuse (MaaS) lahendusi.
Liikuvus kui teenus pakub kasutajatele
ühtse tehnoloogilise platvormi kaudu
nende vajadustel põhinevaid parimaid
reisimisvõimalusi, integreerides erinevaid
liikuvusvõimalusi (nt ühistransport,
jagamisteenused, taksod, autorent) ning
optimeerides reisiplaneerimist ja üldist
kasutajakogemust.
M1C1–24 Investeering
1.7.1: Digitaalne
avalik teenistus
Siht Üksikisikud
osalesid
digitaalses
avalikus
PUUDUVAD Number 0 8 300 4. kv 2025 Digitaalses avalikus teenistuses osales
vähemalt 8 300 isikut organisatsioonides,
mis on registreeritud universaalse avaliku
teenistuse organisatsioonide riiklikus
23
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
teenistuses registris. Digitaalne avalik teenistus
keskendub digiõppele ja/või digitaalsele
hõlbustamisele.
M1C1–25
Investeering
1.6.6:
Finantspolitsei
digiteerimine
Eesmärk
Arendada
majanduskuriteg
evuse vastu
võitlemiseks
kasutatavaid
infosüsteeme
Uute
funktsioonidega IT-
süsteemid
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2025
Majanduskuritegevuse vastu võitlemiseks
kasutatavate infosüsteemide uute
funktsioonide väljalase.
M1C1–27
Investeering
1.3.1: Riiklik
digitaalne
andmeplatvorm
Siht
Rakendusliidese
d riiklikul
digitaalsel
andmeplatvormil
T2
PUUDUVAD Number 3 000 7 000 4. kv 2025
See eesmärk seisneb selles, et API
kataloogis avaldatakse veel vähemalt
4 000 rakendusliidest (kokku 7 000).
Avaldatud rakendusliidesed mõjutavad
mitut valdkonda, mis võivad hõlmata muu
hulgas järgmist:
i) riiklikud andmed, mis on seotud
värbamise, pensionile jäämise, koolis ja
ülikoolis registreerimise (nt riiklik üliõpilaste
register ja avaliku halduse register),
maksukuulekuse või riikliku terviseandmete
ja sanitaarhädaolukordade infosüsteemiga.
Iga rakendusliidese rakendamine ja
dokumentatsioon peab vastama riiklikele
koostalitlusvõime standarditele. Riikliku
digiandmeplatvormi raamistik pakub
funktsioone selle vastavuse hindamiseks.
24
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
M1C1–28
Investeering
1.7.2:
Digitaalsete
lihtsustusteenust
e võrgustik
Siht
Digiõppe
hõlbustamise
keskuste
pakutavates
digiõppe ja/või -
hõlbustusalgatus
tes osalevate
kodanike arv
PUUDUVAD Number 0 2 000 000 2. kv 2026
Vähemalt 2 000 000 kodanikku, kellest
30 % asusid Lõuna-Itaalias, osalesid
digiõppe ja/või hõlbustamise algatustes
vastavalt digiülemineku ministeeriumi
platvormil „Facilita“ registreerimisele.
M1C1–29
Reform 1.4:
Tsiviilõiguse
reform
Eesmärk
Tsiviilõiguse
reformi
võimaldavate
õigusaktide
jõustumine
Seaduse säte, mis
viitab volitust
andva õigusakti
jõustumisele
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2021
Võimaldav õigusakt sisaldab vähemalt
järgmisi meetmeid: i) lihtsustatud
menetluse kasutuselevõtmine esimese
astme/kohtumenetluse tasandil ja
filtreerimismenetluste kohaldamise
tugevdamine apellatsiooni tasandil,
sealhulgas lihtsustatud menetluste
laialdasem kasutamine ja selliste
kohtuasjade ring, milles on pädev
lahendama üksainus kohtunik; ii) tagada
menetluste siduvate ajakavade ning
tõendite kogumise ja asjakohaste aktide ja
dokumentide elektroonilise esitamise
ajakava tegelik rakendamine; iii) reformida
vahenduse ja vaidluste kohtuvälise
lahendamise kasutamist koos toetatud
vahenduse, vahekohtu ja muude
võimalike alternatiividega, et muuta need
instituudid tsiviilkohtusüsteemile
avaldatava surve vähendamisel
tõhusamaks, sealhulgas stiimulite kaudu;
25
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
iv) reformida sundtäitmise menetlust, et
vähendada olemasolevat keskmist aega,
sealhulgas muuta sissenõutavaks
tunnistatud summade sissenõudmine
kiiremaks ja odavamaks; reformida
praegust õigusabikulude kvantifitseerimise
ja sissenõutavuse süsteemi, et
vähendada põhjendamatuid kohtuvaidlusi;
v) võtta kohtu tasandil kasutusele
järelevalvesüsteem ja suurendada
tsiviilkohtute tootlikkust stiimulite abil, et
tagada menetluste mõistlik kestus ja
ühetaoline tulemuslikkus kõigis kohtutes.
M1C1–30
Reform 1.5:
Kriminaalõiguse
reform
Eesmärk
Kriminaalõigusre
formi
võimaldavate
õigusaktide
jõustumine
Seaduse säte, mis
viitab volitust
andva õigusakti
jõustumisele
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2021
Võimaldavad õigusaktid, mis hõlmavad
vähemalt järgmisi meetmeid: i)
läbivaadatud teatamissüsteem, ii)
lihtsustatud menetluste laialdasem
kasutamine, iii) dokumentide elektroonilise
esitamise laiem kasutamine, iv)
lihtsustatud tõendamiseeskirjad, v)
eeluurimise kestuse ja uurimisetapis
stagneerumise vältimise meetmete
kindlaksmääramine, vi) kuriteo lõpetamise
võimaluse laiendamine, kui kahju on
tagasi makstud, vii) järelevalvesüsteemi
kasutuselevõtt kohtu tasandil ja
kriminaalkohtute tootlikkuse
suurendamine stiimulite abil, et tagada
menetluste mõistlik kestus ja ühetaoline
26
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
toimimine kohtutes.
M1C1–31
Reform 1.6:
Maksejõuetusra
amistiku reform
Eesmärk
Maksejõuetusref
ormi raamistikku
võimaldavate
õigusaktide
jõustumine
Seaduse säte, mis
viitab volitust
andva õigusakti
jõustumisele
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2021
Maksejõuetusreform hõlmab vähemalt
järgmisi meetmeid: i) vaadata läbi
vaidluste kohtuvälise lahendamise kord, et
teha kindlaks valdkonnad, kus võib olla
vaja teha täiendavaid parandusi, et
motiveerida asjaomaseid pooli selliseid
menetlusi rohkem kasutama; ii)
kehtestama varajase hoiatamise
mehhanismid ja juurdepääsu teabele
enne maksejõuetusetappi; iii) üleminek
kohtute spetsialiseerumisele (äriõigus,
maksejõuetusosakond/-koda) ning
kohtueelsetele institutsioonidele
maksejõuetusmenetluste haldamiseks; iv)
võimaldada kõigepealt maksta tagatud
nõuetega võlausaldajatele (enne
maksunõudeid ja töötajate nõudeid); v)
võimaldada ettevõtetel anda
mittepositiivse tagatisega seotud õigus.
Lisaks maksejõuetuse reformile tagatakse
restruktureerimismenetlustega tegelevate
õigus- ja haldusasutuste liikmete
koolitamine ja spetsialiseerumine, samuti
restruktureerimis- ja
maksejõuetusmenetluste üldine
digitaliseerimine ning vaidluste
kohtuvälise lahendamise veebiplatvormi
loomine, eelkõige maksejõuetuseelses
27
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
etapis, mille kasutamist stimuleeritakse, et
vähendada kohtusüsteemi koormust
(maksejõuetuseelse restruktureerimise
taotlused, mitmepoolsete
restruktureerimiste edendamine ning
eelnevalt heaks kiidetud automatiseeritud
restruktureerimismenetluste ja väikese
väärtusega juhtumite lahendamise
võimaldamine). Selline digiplatvorm tagab
ka koostalitlusvõime pankade IT-
süsteemide ning muude avaliku sektori
asutuste ja andmebaasidega, et tagada
dokumentide ja andmete kiire ja
elektrooniline vahetamine võlgnike ja
võlausaldajate vahel. Selleks annab
taotleja (võlgnik) nõusoleku oma
isikuandmete vahetamiseks kooskõlas
isikuandmete kaitse üldmäärusega ja see
säte tuleks lisada seadusesse. Reformiga
luuakse tagatiste register.
M1C1–32
Investeering 1.8:
Tsiviil-,
kriminaal- ja
halduskohtute
värbamismenetl
used
Eesmärk
Riiklike taaste- ja
vastupidavuskav
ade värbamist
reguleerivate
eriõigusaktide
jõustumine
Seaduse säte, mis
viitab riikliku
taaste- ja
vastupidavuskava
ga ette nähtud
värbamist
reguleerivate
eriõigusaktide
jõustumisele
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2021
Kiita heaks eriõigusaktid, millega
reguleeritakse riikliku taaste- ja
vastupidavuskava alusel töölevõtmist
koos loaga kuulutada välja ja värvata
töötajaid.
28
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
M1C1–33
Investeering 1.8:
Halduskohtute
värbamismenetl
used
Siht
Halduskohtute
värbamismenetl
uste alustamine
PUUDUVAD Number 0 168 2. kv 2022
Alustada menetlusi vähemalt 168
personaliüksuse töölevõtmiseks
kohtukantseleisse ja halduskohtutesse
ning võtta üksused tööle. Võrdlusaluseks
on 31. detsembri 2021. aasta seisuga
teenistuses olnud töötajate arv.
M1C1–34
Investeering 1.8:
Tsiviil- ja
kriminaalkohtute
kohtukantseleiss
e töölevõtmise
kord
Siht
Tsiviil- ja
kriminaalkohtute
värbamismenetl
uste algus
PUUDUVAD Number 0 8 764 4. kv 2022
Alustada vähemalt 8 764 töötaja
värbamismenetlust tsiviil- ja
kriminaalkohtute kohtukantseleisse ning
võtta üksused tööle. Võrdlusaluseks on
töötajate arv 2021. aasta lõpus.
M1C1–35
Reform 1.7:
Maksukohtute
reform
Eesmärk
Esimese ja teise
astme
maksukohtute
põhjalik reform
Seaduse säte, mis
viitab läbivaadatud
õigusraamistiku
jõustumisele
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2022
Läbivaadatud õigusraamistik muudab
maksuõiguse jõustamise tõhusamaks ja
vähendab kassatsioonikohtule esitatavate
apellatsioonkaebuste suurt arvu.
M1C1–36
Reformid 1.4,
1.5 ja 1.6: Tsiviil-
ja
kriminaalõiguse
reform ning
maksejõuetusref
orm
Eesmärk
Tsiviil- ja
kriminaalõiguse
reforme ning
maksejõuetusref
ormi käsitlevate
delegeeritud
õigusaktide
jõustumine
Delegeeritud
õigusaktide
jõustumisele viitav
säte delegeeritud
õigusaktides
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2022
Kõigi selliste delegeeritud õigusaktide
jõustumine, mille sisu on märgitud tsiviil-
ja kriminaalõiguse reforme ning
maksejõuetusreformi võimaldavates
õigusaktides.
M1C1–37 Reformid 1.4 ja
1.5: Tsiviil- ja
kriminaalõiguse
Eesmärk Tsiviil- ja
kriminaalõiguse
reformi
Teiseste
õigusaktide
jõustumisele viitav
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2023 Viia lõpule kõigi selliste määruste ja
teiseste õigusaktide allikate vastuvõtmine,
mis on vajalikud kohtureforme
29
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
reform jõustumine säte teisestes
õigusaktides
võimaldavate seaduste tõhusaks
kohaldamiseks.
M1C1–38
Reform 1.8:
Õigusemõistmis
e digipööre
Eesmärk Kohtusüsteemi
digitaliseerimine
Esmaste ja
teiseste
õigusaktide sätted,
mis osutavad
vastavate
õigusaktide
jõustumisele
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2023
Tsiviilkohtumenetluses kehtestatakse kõigi
dokumentide kohustuslik elektrooniline
esitamine ja täielik elektrooniline töövoog.
Esimese astme kriminaalmenetlus
digitaliseeriti (v.a eelistungi büroo). Tasuta,
täielikult juurdepääsetava ja otsitava
tsiviilõiguslike otsuste andmebaasi
loomine vastavalt õigusaktidele.
M1C1–38a
Reform 1.8:
Õigusemõistmis
e digipööre
Eesmärk Kohtusüsteemi
digitaliseerimine
Esimese astme
kriminaalmenetlus
ed on digiteeritud
ning
broneeringuinfo,
eraelu
puutumatuse
kaitse ja
varaostukava on
koostalitlusvõimeli
sed
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2025
Esimese astme kriminaalmenetluse
digiteerimine kuni menetluse lõpetamiseni
„portale delle notizie di reato“ (PNR),
„portale dei depositi penali“ (PDP) ja
„applicativo processo penale“ (APP)
kaudu. Platvormid on omavahel
koostalitlusvõimelised.
M1C1–39
Investeering 1.8:
Tsiviil- ja
kriminaalkohtute
värbamismenetl
used
Siht
Taaste- ja
vastupidavuskav
a rakendamise
eest vastutavate
justiitsministeeri
umi tsiviil- ja
kriminaalkohtute
PUUDUVAD Number 0 10 000 2. kv 2024
Viia lõpule vähemalt 10 000 töötaja ja
tehnilise halduspersonali värbamis- või
pikendamismenetlused ning võtta nad
teenistusse.
Selle eesmärgi saavutamisel võetakse
arvesse üksnes värbamis- või
30
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
ning
territoriaalsete ja
kesktalituste
värbamis- või
pikendamismene
tlused
pikendamismenetlusi, mis on lõpule viidud
alates 1. jaanuarist 2022.
M1C1–40
Investeering 1.8:
Halduskohtute
värbamismenetl
used
Siht
Halduskohtute
värbamis- või
pikendamismene
tlused
PUUDUVAD Number 0 158 2. kv 2024
Viia lõpule vähemalt 158 töötaja
töölevõtmise või ametiaja pikendamise
menetlused kohtukantseleis ja
halduskohtutes ning võtta üksused
kasutusele. Selle eesmärgi saavutamisel
võetakse arvesse üksnes värbamis- või
pikendamismenetlusi, mis on lõpule viidud
alates 1. jaanuarist 2022.
M1C1–41
Investeering 1.8:
Halduskohtute
värbamismenetl
used
Siht
Liidumaade
halduskohtute
kuhjunud
kohtuasjade
arvu
vähendamine
PUUDUVAD Protsent 100 75 2. kv 2024
Vähendada 2019. aastal 25 %
pooleliolevate kohtuasjade arvu (109 029)
liidumaa halduskohtutes (esimese astme
halduskohtud).
M1C1–42
Investeering 1.8:
Halduskohtute
värbamismenetl
used
Siht
Riiginõukogu
kohtuasjade
kuhjumise
vähendamine
PUUDUVAD Protsent 100 65 2. kv 2024 Vähendada riiginõukogus (teine aste)
2019. aastal pooleliolevate kohtuasjade
arvu (24 010) 35 % võrra.
M1C1–43 Reform 1.4:
Tsiviilõiguse Siht
Tsiviilkohtute
(esimene aste)
kuhjunud
PUUDUVAD Protsent 100 5 4. kv 2024 Vähendada 31. jaanuari 2020. aasta
seisuga tsiviilkohtutes (esimene aste)
pooleliolevate kohtuasjade arvu (333 218)
31
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
reform kohtuasjade
vähendamine
95 % võrra. Lähtealuseks on
tsiviilkohtutes üle kolme aasta
pooleliolevate kohtuasjade arv (31.
jaanuari 2020. aasta seisuga).
M1C1–44
Reform 1.4:
Tsiviilõiguse
reform
Siht
Kohtuasjade
kuhjumise
vähendamine
tsiviilapellatsioon
ikohtus (teine
aste)
PUUDUVAD Protsent 100 5 4. kv 2024
Vähendada tsiviilkohtute
apellatsioonikohtutes (teine aste)
pooleliolevate kohtuasjade arvu 31.
jaanuari 2020. aasta seisuga (97 251)
95 % võrra.
Lähtealuseks on
tsiviilapellatsioonikohtutes rohkem kui
kaks aastat pooleli olnud kohtuasjade arv
(31. jaanuari 2020. aasta seisuga).
M1C1–37a
Reform 1.4:
Tsiviilõiguse
reform
Eesmärk
Kuhjumise
vähendamise
meetmete
jõustumine
Seaduse säte, mis
viitab esmaste
õigusaktide ja
teiseste
õigusaktide
jõustumisele, et
vähendada
mahajäämust
1. kv 2024
Esmaste õigusaktide ja teiseste
õigusaktide allikate jõustumine, et
võimaldada:
i. Kohtuasutuste tugevdamine, sealhulgas stiimulite abil, et meelitada ligi ja hoida tööl riikliku taaste- ja vastupidavuskava värbamiskava alusel tööle võetud personaliühikuid;
ii. Stiimulite loomine, et: 1) toetada vähem tõhusaid kohtuid kohtuasjade kuhjumise vähendamisel tsiviilasjades; 2) premeerida kohtuasutusi, kes saavutavad konkreetsed iga-aastased eesmärgid vähendada pooleliolevate
32
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
kohtuasjade arvu tsiviilkohtusüsteemis.
M1C1–45
Reformid 1.4:
Tsiviilõiguse
reform
Eesmärk
Tsiviilkohtumene
tluse kestuse
lühendamine
Itaalia riikliku
statistikainstituudi
(ISTAT) aruande
avaldamine
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2026
Itaalia riikliku statistikainstituudi (ISTAT)
aruanne, milles kinnitatakse, et tsiviil- ja
kaubandusvaidluste lahendamise aega on
vähendatud 40 % võrreldes 31.
detsembriga 2019 (2512 päeva).
Aruandele lisatakse alusandmeid sisaldav
lisa.
M1C1–46
Reform 1.5:
Kriminaalõiguse
reform
Eesmärk
Kriminaalmenetl
use kestuse
lühendamine
Itaalia riikliku
statistikainstituudi
(ISTAT) aruande
avaldamine
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2026
Itaalia riikliku statistikaameti (ISTAT)
aruanne, milles kinnitatakse, et 31.
detsembriks 2025 lüheneb otsusele
jõudmiseks kuluv aeg kõigi
kriminaalasjade puhul 25 % võrreldes 31.
detsembriga 2019 (1398 päeva).
Aruandele lisatakse alusandmeid sisaldav
lisa.
M1C1–47
Reform 1.4:
Tsiviilõiguse
reform
Siht
Tsiviilkohtute
kohtuasjade
kuhjumise
vähendamine
(esimene aste)
PUUDUVAD Protsent 100 10 2. kv 2026
Vähendada 90 % nende pooleliolevate
kohtuasjade arvu, mis olid avatud 1.
veebruarist 2017 kuni 31. detsembrini
2022 ja mis olid 31. detsembri 2022. aasta
seisuga tsiviilkohtutes (esimeses astmes)
veel pooleli.
M1C1–48
Reform 1.4:
Tsiviilõiguse
reform
Siht
Kohtuasjade
kuhjumise
vähendamine
tsiviilapellatsioon
ikohtus (teine
PUUDUVAD Protsent 100 10 2. kv 2026
Vähendada 90 % nende pooleliolevate
kohtuasjade arvu, mis olid algatatud
ajavahemikul 1. veebruarist 2018 kuni 31.
detsembrini 2022 ja mis olid 31. detsembri
2022. aasta seisuga tsiviilasjade
33
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
aste) apellatsioonikohtutes (teine aste) veel
pooleli.
M1C1–49
Investeering 1.8:
Halduskohtute
värbamismenetl
used
Siht
Liidumaade
halduskohtute
kohtuasjade
kuhjumise
vähendamine
(esimene aste)
PUUDUVAD Protsent 100 20 4. kv 2025
Vähendada 30. juuni 2023. aasta seisuga
kõigis liidumaade halduskohtutes
(esimese astme halduskohus)
pooleliolevate kohtuasjade koguarvu
(102 144) 80 % võrra.
M1C1–50
Investeering 1.8:
Halduskohtute
värbamismenetl
used
Siht
Riiginõukogu
kohtuasjade
kuhjumise
vähendamine
PUUDUVAD Protsent 100 30 4. kv 2025
Vähendada 70 % nende pooleliolevate
kohtuasjade arvu, mis on 30. juuni 2024.
aasta seisuga riiginõukogus (teine aste)
veel pooleli (12 287).
M1C1–51
Reform 1.9:
Avaliku halduse
reform
Eesmärk
Itaalia taaste- ja
vastupidavuskav
a juhtimist
käsitlevate
esmaste
õigusaktide
jõustumine
Seaduse
jõustumisele viitav
õigusnorm
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2021
Esmased õigusaktid käsitlevad vähemalt
järgmist:
1) Itaalia taaste- ja vastupidavuskava
projektide koordineerimine ja järelevalve
kesktasandil;
2) Itaalia taaste- ja vastupidavuskava
koordineerimises, järelevalves ja
rakendamises osalevate eri organite ja
haldusasutuste pädevuste määratlemine
ja lahusus ning asjaomaste volituste
kinnitamine;
3) rakendusprobleemide varajase
avastamise süsteemi määratlemine;
4) jõustamismehhanismi eelnev
34
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
kindlaksmääramine, et lahendada
rakendamisega seotud probleemid ja
vältida viivitusi, eelkõige seoses eri
haldustasanditega;
5) Itaalia taaste- ja vastupidavuskava
koordineerimise, järelevalve ja
rakendamisega tegelevate töötajate (arv
ja eksperditeadmised) kindlaksmääramine
asjaomastes haldusasutustes;
6) Itaalia taaste- ja vastupidavuskava
rakendamises osalevatele
haldusasutustele eelkõige kohalikul
tasandil antava tehnilise abi määratlus,
millega tagatakse avaliku halduse
haldussuutlikkuse suurendamine;
Itaalia taaste- ja vastupidavuskava
rakendamise ning rahaliste vahendite
õigeaegse kasutuselevõtu kiirmenetluste
kirjeldus;
8) Itaalia taaste- ja vastupidavuskava
auditi- ja kontrollikorraldus ning -
menetlused.
M1C1–52
Reform 1.9:
Avaliku halduse
reform
Eesmärk
Itaalia taaste- ja
vastupidavuskav
a rakendamise
haldusmenetlust
e lihtsustamist
Seaduse
jõustumisele viitav
õigusnorm
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2021
Kõnealused meetmed hõlmavad:
1) kriitiliste kitsaskohtade kõrvaldamine,
eelkõige seoses riikliku ja piirkondliku
keskkonnamõju hindamisega, uutele
jäätmete ringlussevõtu tehastele loa
35
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
käsitlevate
esmaste
õigusaktide
jõustumine.
andmisega, taastuvenergiale loa andmise
menetlustega ning hoonete
energiatõhususe (nn Super Bonus) ja
linnade taaselustamise saavutamiseks
vajalike menetlustega. Erimeetmeid
võetakse menetluste lihtsustamiseks
„Conferenza di servizi“ raames (ametlik
kokkulepe kahe või enama haldusasutuse
vahel).
M1C1–53
Investeering 1.9:
Anda tehnilist
abi ja tugevdada
suutlikkuse
suurendamist
Itaalia taaste- ja
vastupidavuskav
a rakendamiseks
Eesmärk
Jõustuvad
esmased
õigusaktid,
millega antakse
tehnilist abi ja
tugevdatakse
suutlikkust
Itaalia taaste- ja
vastupidavuskav
a rakendamiseks
Seaduse
jõustumisele viitav
õigusnorm
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2021
Meetmed hõlmavad sätet, mis võimaldab
ajutiselt värvata:
i) 2 800 tehnilist näitajat lõunapoolsete
riikide avaliku halduse tugevdamiseks,
mida rahastatakse riigieelarvest;
ii) 1 000 eksperdist koosnev reserv, mis
lähetatakse kolmeks aastaks, et toetada
haldusasutusi uute tehnilist abi pakkuvate
menetluste haldamisel.
M1C1–54
Investeering 1.9:
Anda tehnilist
abi ja tugevdada
suutlikkuse
suurendamist
Itaalia taaste- ja
vastupidavuskav
a rakendamiseks
Siht
Lõpule viidud
ekspertide
värbamine
Itaalia taaste- ja
vastupidavuskav
a rakendamiseks
PUUDUVAD Number 0 1 000 4. kv 2021
Viia lõpule värbamismenetlused, mis
hõlmavad 1 000 eksperti, kes lähetatakse
kolmeks aastaks, et toetada haldusasutusi
uute tehnilist abi pakkuvate menetluste
haldamisel.
36
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
M1C1–55
Reform 1.9:
Avaliku halduse
reform
Eesmärk
Itaalia taaste- ja
vastupidavuskav
a suhtes
kohaldatava
metoodika
laiendamine
riigieelarvele, et
suurendada
investeeringute
kasutamist
Seaduse säte, mis
viitab metoodika
laiendamise
jõustumisele
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2021
Luua taaste- ja vastupidavusrahastuga
sarnane eesmärkide ja sihtide lihtsustatud
süsteem projektide kavandamiseks,
elluviimiseks ja rahastamiseks täiendava
investeerimisfondi raames (30,5 miljardit
eurot).
M1C1–56
Reform 1.9:
Avaliku halduse
reform
Eesmärk
Avaliku sektori
tööhõive reformi
võimaldavate
õigusaktide
jõustumine
Seaduse
jõustumisele viitav
õigusnorm
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2022
Võimaldav õigusakt sisaldab järgmisi
meetmeid:
– määratleda avalikule sektorile omased
ametiprofiilid, et meelitada ligi vajalikke
pädevusi ja oskusi;
– ühtse värbamisplatvormi loomine, et
tsentraliseerida avalikud
värbamismenetlused kõigi kesksete
haldusasutuste jaoks, kohustudes
laiendama platvormi kasutamist ka
kohalikele omavalitsustele;
– värbamisprotsessi reform, et: i) minna
puhtalt teadmistepõhiselt süsteemilt üle
süsteemile, mis põhineb peamiselt
pädevustel ja asjakohastel võimetel; ii)
hinnata riigiteenistujate pädevust; iii)
eristada värbamisprotsesse algtasemel
värbamisest, mis on puhtalt
37
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
pädevuspõhine, ja eriprofiilidega
värbamisest, mis peaks ühendama
pädevused asjakohase töökogemusega ja
viima karjääri alustamiseni kõrgemal
tasandil. Avaliku halduse ministeerium
tagab uue protsessi järjepideva
rakendamise kõigis haldusasutustes;
– kõrgema avaliku teenistuse reform, et
ühtlustada ametisse nimetamise
menetlusi kogu avalikus halduses,
määratledes ametiprofiilid ja hinnates
nende tulemuslikkust;
– tugevdada seost töötajate elukestva
õppe ja koolitusvõimaluste ning osalemise
stiimulite vahel, näiteks nähes ette
premeerimismehhanismid või konkreetsed
karjäärivõimalused, pöörates erilist
tähelepanu kaksiküleminekule;
– määratleda või ajakohastada
haldusasutuste eetikapõhimõtteid selgete
eeskirjade, käitumisjuhendite ja
teemakohaste koolitusmoodulite abil;
– tugevdada pühendumist soolisele
tasakaalule;
– uuendada vertikaalset liikuvust
käsitlevat õigusraamistikku, reformides
karjäärivõimalusi keskastme juhtide
38
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
ametikohtade (quadri) loomiseks ja neile
juurdepääsuks ning kõrgematele
tsiviilametikohtadele (dirigenti di prima e
seconda fascia) pääsemiseks
administratsioonist. See hõlmab
tulemuslikkuse hindamise süsteemi
reformimist ning karjääri edenemise ja
tulemuslikkuse hindamise vahelise seose
tugevdamist;
– vaadata läbi horisontaalset liikuvust
käsitlev õigusraamistik, et saavutada
haldusasutustes tõhus tööturg, sealhulgas
a) luua läbipaistev ühtne reklaamisüsteem
kõigi vabade ametikohtade jaoks kesk- ja
kohalikes haldusasutustes, b) võimalus
kandideerida mis tahes vabale
ametikohale, c) päritoluasutusest liikuvuse
loa kaotamine ja d) oluliste piirangute
kehtestamine alternatiivsete
liikuvusvahendite kasutamisele, mis ei too
kaasa üleviimisi (st „comandi“ ja
„distacchi“), et muuta need erandlikuks ja
rangelt ajaliselt piiratud.
M1C1–57
Reform 1.9:
Avaliku halduse
reform
Eesmärk
Taaste- ja
vastupidavusrah
astu
rakendamiseks
mõeldud
lihtsustamisrefor
Seaduse säte, mis
viitab teiseste
õigusaktide
jõustumisele
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2022
Kõigi seonduvate delegeeritud
õigusaktide, ministri dekreetide, teiseste
õigusaktide ja kõigi muude lihtsustamise
tõhusaks rakendamiseks vajalike
määruste jõustumine, sealhulgas
kokkulepped piirkondadega ainupädevuse
39
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
miga seotud
haldusmenetlust
e jõustumine
ja samaaegse piirkondliku pädevuse
korral.
M1C1–58
Reform 1.9:
Avaliku halduse
reform
Eesmärk
Avaliku sektori
tööhõive reformi
käsitlevate
õigusaktide
jõustumine
Säte, mis viitab
avaliku sektori
tööhõive reformi
käsitlevate
õigusaktide
jõustumisele
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2023
Kõigi seotud delegeeritud õigusaktide,
ministri dekreetide, teiseste õigusaktide ja
kõigi muude reformi tõhusaks
rakendamiseks vajalike määruste
jõustumine.
M1C1–59
Reform 1.9:
Avaliku halduse
reform
Eesmärk
Strateegilise
personalijuhtimis
e jõustumine
avalikus
halduses
Säte, mis viitab
avaliku halduse
strateegilise
personalijuhtimise
kasutuselevõttu
käsitlevate
õigusaktide
jõustumisele
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2023
Õigusaktid ja delegeeritud õigusaktid
strateegilise personalijuhtimise
kasutuselevõtmiseks avalikus halduses
hõlmavad järgmist: personalipoliitika
strateegiliste kavade määratlemine
integreeritud tegevus- ja
organisatsioonikava (PIAO) raames kõigi
kesk- ja piirkondlike haldusasutuste
töötajate värbamiseks, karjääri
arendamiseks ja koolitamiseks, mida
toetab oskuste ja profiilidega integreeritud
andmebaas; personaliplaneerimise
süsteemi koordineeriva ja toetava keskse
rakendusüksuse loomine. Teises etapis
laiendatakse personalistrateegia kavasid
suurtele omavalitsustele, samal ajal kui
väikeste ja keskmise suurusega
omavalitsuste jaoks tehakse konkreetseid
suutlikkuse suurendamise investeeringuid.
40
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
M1C1–
59BIS
Reform 1.9:
Avaliku halduse
reform
Eesmärk
Strateegilise
personalijuhtimis
e rakendamine
avalikus
halduses
Avaldatakse
esimene
poolaastaaruanne
peamiste
tulemusnäitajate
kohta.
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2024 Avaldatakse esimene poolaastaaruanne
peamiste tulemusnäitajate kohta.
M1C1–59b
Reform 1.9:
Avaliku halduse
reform
Eesmärk
Strateegilise
personalijuhtimis
e rakendamine
avalikus
halduses
HRM-Minerva
töövahend, mis on
koostalitlusvõimeli
ne partnerluse
rahastamisvahendi
, Syllabusi ja PIAO
digiplatvormiga,
ning personali
strateegiakavade
läbivaatamine.
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2026
„Verifica di conformità“, mis tõendab, et i)
„Toolkit HRM-Minerva“ toimib ja ii) on
koostalitlusvõimeline värbamisplatvormiga
(makseasutuses), platvormiga „Syllabus“
ja digiplatvormiga PIAO.
Avaliku teenistuse osakonna analüüsis,
mis hõlmab vähemalt 200 riikliku ja
piirkondliku haldusasutuse katseprojekti, i)
uuritakse PIAOs sisalduvate personali
strateegiakavade (Programma Triennale
dei Fabbisogni del Personale) sisu, ii)
kirjeldatakse, mil määral on poolaasta
peamiste tulemusnäitajate aruannete
järeldusi arvesse võetud, iii) mainitakse
andmekaitse peadirektoraadi soovitatud
järelmeetmeid.
M1C1–60
Reform 1.9:
Avaliku halduse
reform
Siht
200 kodanikke ja
ettevõtjaid
mõjutava
kriitilise
PUUDUVAD Number 0 200 4. kv 2024 Menetluste lihtsustamine ja/või
digitaliseerimine hõlmab vähemalt
järgmist valdkonda:
41
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
tähtsusega
menetluse
lihtsustamine
ja/või
digitaliseerimine
1) keskkond ja energeetika, taastuvad
energiaallikad ja keskkonnahoidlik
majandus;
2) ehitus ja linnade
ümberkvalifitseerimine;
3) elektroonilise side taristu;
4) Majandustegevuse alustamine ja
korraldamine.
M1C1–62
Reform 1.9:
Avaliku halduse
reform
Eesmärk
Suurendada
investeeringute
kasutamist
Rahandusministee
riumi aruande
avaldamine
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2025 Avaldatakse aruanne, milles mõõdetakse
kuni 2024. aastani eraldatud lisafondi
vahendite kasutamist.
M1C1–63
Reform 1.9:
Avaliku halduse
reform
Eesmärk
Lihtsustatud
ja/või digiteeritud
menetluste
andmekogu
avaldamine
Hoidla avaldamine
avaliku teenistuse
osakonna
veebisaidil
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2026
Lihtsustatud ja/või digiteeritud menetluste
andmekogu on kättesaadav avaliku
teenistuse osakonna hallataval veebisaidil
(www.italiasemplice.gov.it).
Andmed Sportello Unico Attività Produttive
(SUAP) ja Sportello Unico Edilizia (SUE)
kättesaadavuse kohta kogu riigi
territooriumil on kättesaadavad veebisaidil
www.impresainungiorno.gov.it.
M1C1–66
Investeering 1.9:
Anda tehnilist
abi ja tugevdada
suutlikkuse
suurendamist
Siht
Syllabusi
platvormil
osalemise
aruanded
PUUDUVAD Number 0 441 750 2. kv 2026 Vähemalt 441 750 osalemisaruannet
Syllabusi platvormil.
42
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
Itaalia taaste- ja
vastupidavuskav
a rakendamiseks
M1C1–68
Reform 1.9:
Avaliku halduse
reform
Eesmärk
Auditi ja kontrolli
andmekogu
süsteem: teave
taaste- ja
vastupidavusrah
astu
rakendamise
järelevalveks
Auditiaruanne,
milles kinnitatakse
hoidlasüsteemi
funktsioone
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2021
Taaste- ja vastupidavusrahastu
rakendamise seireks peab olema sisse
seatud ja toimima hoidlasüsteem.
Süsteem peab sisaldama vähemalt
järgmisi funktsioone:
a) koguda andmeid ning jälgida vahe-
eesmärkide ja sihtide saavutamist;
b) koguda, säilitada ja tagada juurdepääs
taaste- ja vastupidavusrahastu määruse
artikli 22 lõike 2 punkti d alapunktides i-iii
nõutud andmetele.
M1C1–69
Reform 1.10:
Riigihangete
õigusraamistiku
reform
Eesmärk
Riigihangete
süsteemi
lihtsustamist
käsitleva
dekreedi
jõustumine
Seadusesäte, mis
viitab
dekreetseaduse
jõustumisele, et
lihtsustada
riigihangete
süsteemi.
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2021
Dekreetseadusega lihtsustatakse
riigihangete süsteemi vähemalt järgmiste
kiireloomuliste meetmetega:
i. Eesmärgid avaldamise ja lepingu
sõlmimise vahelise aja lühendamiseks.
ii. Kehtestatakse eesmärgid ja
järelevalvesüsteem, et lühendada lepingu
sõlmimise ja taristu valmimise vahelist
aega (fase esecutiva).
iii. Nõuab, et kõigi lepingute andmed
registreeritaks riikliku korruptsioonivastase
võitluse ameti (ANAC)
43
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
korruptsioonivastases andmebaasis.
iv. Rakendada ja stimuleerida
alternatiivseid vaidluste lahendamise
mehhanisme riigihankelepingute täitmise
etapis.
v. loob ministeeriumides, piirkondades ja
suurlinnades riigihankemenetluste eest
vastutavad spetsiaalsed bürood.
Täiendavad täpsustused:
– Kesksete hankijate (centrali di
committenza) menetluste lihtsustamine ja
digitaliseerimine;
– Rakendada kehtiva riigihangete
seadustiku artikleid 41 ja 44;
– Määrata kindlaks, kuidas tuleks
menetlused kõigi riigihankelepingute ja
kontsessioonide puhul digitaliseerida, ning
määrata kindlaks koostalitlusvõime ja
omavahelise ühendatuse nõuded;
– Rakendada kehtiva riigihangete
seadustiku artiklit 44.
M1C1–70
Reform 1.10:
Riigihangete
õigusraamistiku
reform
Eesmärk
Riigihangete
seadustiku
muutmise
jõustumine
(D.Lgs. nr
Seaduse säte, mis
viitab
delegeerimisseadu
se jõustumisele,
millega
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2022
Käesoleva seadusega kehtestatakse kõik
riigihangete seadustiku süsteemse reformi
täpsed kriteeriumid ja põhimõtted.
Delegeerimisseaduses nähakse ette
44
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
50/2016) reformitakse
praegust
riigihangete
süsteemi
seadustikku
(D.Lgs. n.
50/2016)
vähemalt järgmised põhimõtted ja
kriteeriumid:
i. Vähendada avaliku sektori hankijate
killustatust, 1) kehtestades
kvalifitseerimissüsteemi põhielemendid, 2)
nõudes e-platvormi loomist põhinõudena,
et osaleda kogu riiki hõlmavas
hankesuutlikkuse hindamises, 3) andes
riiklikule korruptsioonivastasele asutusele
(ANAC) volitused vaadata läbi avaliku
sektori hankijate kvalifitseerimine seoses
hankesuutlikkusega (ostude liigid ja
mahud), 4) pakkudes stiimuleid
olemasolevate kutseliste kesksete
hankijate kasutamiseks.
ii. Lihtsustada ja digitaliseerida kesksete
hankijate (centrali di committenza)
menetlusi
iii. Määrata kindlaks, kuidas digiteeritakse
menetlused kõigi riigihankelepingute ja
kontsessioonide puhul, ning määrata
kindlaks koostalitlusvõime ja omavahelise
ühendatuse nõuded.
iv. Vähendada järk-järgult allhangetega
seotud piiranguid.
M1C1–71 Reform 1.10:
Riigihangete Eesmärk Kõigi
riigihankesüstee
Kõigi vajalike
õigusaktide, PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2021 Kõik vajalikud õigusaktid, määrused ja
rakendusaktid (sealhulgas vajaduse korral
45
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
õigusraamistiku
reform
mi jaoks vajalike
õigusaktide,
määruste ja
rakendusaktide
(sealhulgas
teiseste
õigusaktide)
jõustumine
määruste ja
rakendusaktide
jõustumine
teisesed õigusaktid) peavad andma
järgmised tulemused:
i. Riigihankepoliitika ühtsel
koordineerimisasutusel peab olema
piisavalt töötajaid ja rahalisi vahendeid
(mis täpsustatakse tegevuskokkuleppes),
et ta oleks täielikult toimiv, muu hulgas
tänu ANACi spetsiaalse struktuuri
toetusele.
ii. Riigihankepoliitika ühtne
koordineerimisasutus võtab ANACi ja
riikliku halduskooli toetusel vastu
kutseliseks muutmise strateegia (vrd
Itaalia riikliku ja piirkondliku partnerluse
kava kavandatud reformiga 2.1.6), mis
sisaldab eri tasandite koolitusliike,
spetsiaalset juhendamist ja
tegevussuuniste koostamist.
iii. Dünaamilised hankesüsteemid teeb
kättesaadavaks Consip ja need on
kooskõlas riigihankedirektiividega.
iv. ANAC viib lõpule avaliku sektori
hankijate kvalifitseerimise seoses
hankesuutlikkusega vastavalt riigihangete
seadustiku artiklile 38.
v. Lepingu sõlmimise ja
infrastruktuuritööde lõpetamise vahelise
46
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
aja järelevalvesüsteem toimib.
vi. Kõigi lepingute andmed
registreeritakse riikliku
korruptsioonivastase võitluse ameti
(ANAC) korruptsioonivastase võitluse
andmebaasis.
vii. Kõik ministeeriumide, piirkondade ja
suurlinnade riigihankemenetluste eest
vastutavad bürood.
M1C1–72
Reform 1.11:
Riigiasutuste ja
tervishoiuasutust
e hilinenud
maksete
vähendamine
Eesmärk
Kiidetakse heaks
meetmed
riigiasutuste
poolt
ettevõtetele
tehtavate
hilinenud
maksete
vähendamiseks
Õigusakti säte, mis
viitab
makseasutuse
poolt ettevõtjatele
tehtavate hilinenud
maksete
vähendamise
eeskirjade
jõustumisele
PUUDUVAD PUUDUVAD PUUDUVAD 1. kv 2023
Uute eeskirjade jõustumine, et vähendada
riigiasutuste hilinenud makseid
ettevõtetele.
Meetmed hõlmavad vähemalt järgmisi
põhielemente:
i. Süsteemi InIT võetakse kasutusele
keskses avalikus halduses, et toetada
majandus- ja finantsarvestust ning avaliku
sektori kulutuste tegemist.
ii. Hilinenud maksmine:
rahandusministeeriumi IT-süsteemi
(ärilaenude platvorm – PCC) andmebaasil
põhinevad näitajad on avaliku sektori
asutuste kaalutud keskmine makseaeg
ettevõtjatele ja avaliku sektori asutuste
kaalutud keskmine makseviivitus
ettevõtjatele igal järgmisel avaliku halduse
47
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
tasandil:
- keskasutused (Amministrazioni dello Stato, enti pubblici nazionali e altri enti)
- piirkondlikud omavalitsused (Regioni ja Provints Autonome),
- kohalikud omavalitsused (enti locali)
- riiklikud tervishoiuasutused (enti del Servizio sanitario nazionale).
M1C1–72a
Reform 1.11:
Riigiasutuste ja
tervishoiuasutust
e hilinenud
maksete
vähendamine
Eesmärk
Seadusandlikud
ja erimeetmed
hilinenud
maksete
vähendamiseks
kesk-/kohalikul
tasandil
Õigusakti säte,
milles on märgitud
jõustumine,
vastuvõetud
ringkirjad ja
meetmed, mis on
võetud
riigiasutuste poolt
ettevõtjatele
tehtavate hilinenud
maksete
vähendamiseks
PUUDUVAD PUUDUVAD PUUDUVAD 1. kv 2024
Jõustuvad järgmised õigusaktid:
– ringkiri, milles selgitatakse äriliste ja
mitteäriliste tehingute ulatust kooskõlas
hilinenud maksete direktiiviga;
– ringkiri, milles selgitatakse hilinenud
maksete direktiivi artikli 4 lõike 6
kohaldamisala kooskõlas viimati
nimetatud direktiiviga;
– õigusaktid, millega tagatakse, et
tavapiirkonnad ja kohalikud omavalitsused
saavad rahalisi vahendeid, et tasuda oma
arved kesktasandilt õigeaegselt;
– õigusaktid, millega nõutakse, et avaliku
sektori asutused võtaksid vastu iga-
aastased rahavoogude kavad, millega
tagatakse seadusjärgsetest
48
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
maksetähtaegadest kinnipidamine;
– õigusakt, millega kehtestatakse sätted,
mis võimaldavad krediidi loovutamist
kolmandatele isikutele pärast 30 päeva
möödumist ametiasutuste
vaikimisest/tegevusetusest.
Kesktasandil võetakse järgmised
meetmed:
– Selliste õigusaktide jõustumine, millega
määratakse kindlaks hilinenud maksjad
kesktasandil ja nõutakse meetmete
võtmist, et tagada nende maksmine 30
päeva jooksul;
– Avaldatakse ministeeriumide
võlgnevuste seis, mida ajakohastatakse
kord kvartalis;
– Rakkerühmade loomine, kui see on
õigusaktidega nõutav.
Kohalikul tasandil võetakse järgmised
meetmed:
– Selliste õigusaktide jõustumine, millega
määratakse kindlaks hilinenud maksjad
kohalikul tasandil ja nõutakse meetmete
võtmist, et tagada nende maksmine 30
päeva jooksul;
49
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
– Avaldatakse nende asutuste
võlgnevuste seis, mida ajakohastatakse
kord kvartalis.
M1C1–72b
Reform 1.11:
Riigiasutuste ja
tervishoiuasutust
e hilinenud
maksete
vähendamine
Eesmärk
Suurendada
maksetega
tegelevaid
inimressursse
Säte, mis osutab
selliste õigusaktide
jõustumisele,
millega nähakse
ette võimalus
suurendada
maksetega
tegelevaid
inimressursse
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2024
Selliste õigusaktide jõustumine, millega
nähakse ette võimalus suurendada
maksetega tegelevaid inimressursse
järgmistes valdkondades:
Ministeeriumid, kes on tuvastatud
hilinenud maksjatena ja kes on esitanud
sekkumiskava kooskõlas 2. märtsi 2024.
aasta dekreetseadusega nr 19, mis
muudeti 29. aprilli 2024. aasta seaduseks
nr 56;
– üle 60 000 elanikuga omavalitsused,
provintsid ja suurlinnad, mis on
määratletud hilinenud maksjatena, kes
esitasid sekkumiskava kooskõlas 2. märtsi
2024. aasta dekreetseadusega nr 19, mis
kinnitati seadusena 29. aprilli 2024. aasta
seadusega nr 56.
M1C1–
72quater
Reform 1.11:
Riigiasutuste ja
tervishoiuasutust
e hilinenud
maksete
vähendamine
Eesmärk Auditikava
vastuvõtmine
Auditikava
vastuvõtmine PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2024
Auditikava, sealhulgas selle rakendamise
tegevuskava vastuvõtmine olemasolevate
makseprotsesside piisavuse ja
õigeaegsuse kohta vähemalt 130 avaliku
halduse asutuse puhul, keda peetakse
hilinenud maksjateks, sealhulgas: i)
kesktasand (sealhulgas ministeeriumide
territoriaalsed harud); ii)
50
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
omavalitsusüksused; ning iii)
rahvaterviseasutused.
M1C1–
72quinquies
Reform 1.11:
Riigiasutuste ja
tervishoiuasutust
e hilinenud
maksete
vähendamine
Eesmärk
Avaliku halduse
asutuste tehtud
makseid
käsitleva teabe
ja andmete
avaldamine
Avaliku halduse
asutuste tehtud
makseid käsitleva
teabe ja andmete
avaldamine
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2025
Spetsiaalsel veebilehel avaldatakse
järgmine teave:
– Haldusasutuste faktuurarvete
maksetähtaegu käsitleva õigusraamistiku
selgitus, sealhulgas maksetähtajad ja
võlausaldajatele kättesaadavad
õiguskaitsevahendid maksete hilinemise
korral;
– Avaliku halduse maksetähtaegade
jälgimisel põhinevad analüüsid;
– Andmed kaalutud keskmise makseaja,
kaalutud keskmise makseviivituse,
makstud kaubandusliku summa ja
tasumisele kuuluva kaubandusliku summa
suhte, faktuurarvete summa ja
mittefaktuurarvete summa kohta, mida
ajakohastatakse kord kvartalis vähemalt
kulutusi tegevate ministeeriumide,
piirkondade/autonoomsete provintside,
omavalitsuste ja kohalike
tervishoiuasutuste puhul;
– Korduma kippuvad küsimused avaliku
halduse asutuste maksete kohta.
Kõigi kulutusi tegevate ministeeriumide
51
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
veebisaidil on link vastavale veebilehele.
M1C1–
72soolised
Reform 1.11:
Riigiasutuste ja
tervishoiuasutust
e hilinenud
maksete
vähendamine
Eesmärk Auditikava lõplik
auditiaruanne
Auditikava lõpliku
auditiaruande
edastamine
majandus- ja
rahandusministeeri
umi kabinetile
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2025
Riigi pearaamatupidaja edastab
auditikava lõpliku auditiaruande
majandus- ja rahandusministeeriumi
kantseleile. Aruanne sisaldab 2025. aasta
neljandaks kvartaliks tehtud auditite
tulemusi, sealhulgas 2025. aasta
neljandaks kvartaliks rakendatud
parandusmeetmeid.
M1C1–73
Reform 1.10:
Riigihangete
õigusraamistiku
reform
Eesmärk
Riigihangete
seadustiku
reformi
jõustumine
Seaduse säte, mis
viitab
seadusandliku
dekreedi
jõustumisele,
millega
rakendatakse kõik
riigihangete
seadustiku reformi
käsitleva
delegeerimisseadu
se sätted
PUUDUVAD PUUDUVAD PUUDUVAD 1. kv 2023
Seadusandliku dekreedi jõustumine, et
rakendada kõik riigihangete seadustiku
reformimist käsitleva
delegeerimisseaduse sätted.
M1C1–74
Reform 1.10:
Riigihangete
õigusraamistiku
reform
Eesmärk
Riigihankeseadu
stiku
lihtsustamise
reformi kõigi
vajalike
rakendusmeetm
ete ja teiseste
Kõigi vajalike
rakendusmeetmet
e ja teiseste
õigusaktide
jõustumine
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2023
Kõigi riigihankesüsteemi
reformiks/lihtsustamiseks vajalike
rakendusmeetmete ja teiseste õigusaktide
jõustumine (samuti tulenevalt
riigihankeseadustiku läbivaatamisest).
52
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
õigusaktide
jõustumine
M1C1–73a
Reform 1.10:
Riigihangete
õigusraamistiku
reform
Eesmärk
Ringkirja
vastuvõtmine,
milles antakse
avaliku sektori
hankijatele
suuniseid
kvalifitseerimissü
steemi kohta
Ringkirja
vastuvõtmine,
milles antakse
avaliku sektori
hankijatele
suuniseid
kvalifitseerimissüst
eemi kohta
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2024
Pärast ANACiga konsulteerimist võetakse
vastu ringkiri, milles antakse suuniseid
kehtivate kohaldatavate kvalifitseerimis- ja
tsentraliseerimiseeskirjade kohta, et
selgitada, et kvalifitseerimine ja/või
kesksete hankijate kasutamine on
võimalik ja soovitatav ka künnisest
allapoole jäävate lepingute puhul.
M1C1–73b
Reform 1.10:
Riigihangete
õigusraamistiku
reform
Eesmärk
Stiimulid avaliku
sektori hankijate
kvalifitseerimisek
s ja kutseliseks
muutmiseks.
Cabina di Regia
analüüs,
koolitustegevuses
ja
enesehindamises
osalemise
tulemuste
avaldamine ning
algatuste ja
vahendite
vastuvõtmine
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2024
Pärast ANACiga konsulteerimist Cabina di
Regia (vastavalt riigihangete seadustiku
artiklile 221) analüüs riigihangete
seadustiku kohaldamise mõju kohta:
- kvalifitseeritud avaliku sektori hankijate ja kesksete hankijate arv;
- nende riigihankelepingute arv ja maksumus, mida haldavad kvalifitseeritud hankijad enda ja kvalifitseerimata üksuste nimel;
- kvalifitseerimine, et kiirendada otsuste tegemist riigihankelepingute sõlmimisel.
Mittekvalifitseeritud üksuste
koolitustegevuses osalemise
kaardistamise ja enesehindamise
tulemuste avaldamine.
53
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
Võetakse vastu algatused, mille eesmärk
on parandada avaliku sektori hankijate
kvalifikatsiooni, vähendada killustatust ja
muuta kvalifitseerimata üksused
professionaalsemaks.
Tagatakse vahendid avaliku sektori
hankijate tehniliseks/haldusalaseks
toetamiseks.
M1C1–
73quater
Reform 1.10:
Riigihangete
õigusraamistiku
reform
Eesmärk
ELi piirmäärast
allapoole jäävaid
hankeid
käsitlevate
suuniste
jõustumine
ELi piirmäärast
allapoole jäävaid
hankeid
käsitlevate
suuniste
jõustumine
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2023
Itaalia ametlikus väljaandes vastu võetud
ja avaldatud ringkiri ELi piirmäärast
allapoole jäävate hangete kohta.
Ringkirjas selgitatakse, et avaliku sektori
hankijad võivad kasutada ELi piirmäärast
allapoole jäävate hangete puhul avatud ja
piiratud hankemenetlusi.
M1C1–
73nquies
Reform 1.10:
Riigihangete
õigusraamistiku
reform
Eesmärk
Projektide
rahastamist
käsitlevate uute
õigusnormide
jõustumine
Seaduse säte, mis
viitab uute
õigusnormide
jõustumisele
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2024
Projektide rahastamist käsitlevate uute
õigusnormide jõustumine, mille eesmärk
on suurendada tõhusust ja konkurentsi,
eelkõige kontsessioonide konkurentsile
avatust.
M1C1–75
Reform 1.10:
Riigihangete
õigusraamistiku
reform
Eesmärk
Riikliku e-
riigihangete
süsteemi täielik
toimimine
Teostatavusuuring
us määratletud
funktsioonide
kättesaadavus
(täiendatakse
projekti 1.
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2023
Riiklik e-riigihangete süsteem toimib ja on
täielikult kooskõlas ELi
riigihankedirektiividega ning hõlmab
menetluste täielikku digiteerimist kuni
lepingu täitmiseni (arukas hange), on
koostalitlusvõimeline avaliku halduse
54
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
ülesandena) juhtimissüsteemidega, hõlmab
tootjaorganisatsiooni digitaalset haldamist,
enampakkumisi, masinõpet suundumuste
tuvastamiseks, kriitilise tähtsusega
toorainete kasutamist juturobotitega,
digitaalset kaasamist ja staatuseahelat.
M1C1–75a
Investeering
1.10:
Kvalifikatsiooni
ja e-riigihangete
toetamine
Eesmärk
Kvalifikatsiooni
ja e-riigihangete
toetamine
Hanke
tugifunktsiooni
kasutuselevõtmine
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2024
Avaliku sektori hankijate kutseliseks
muutmise strateegia raames luuakse
hankeid toetav funktsioon. Hangete
tugifunktsioon on ette nähtud avaliku
sektori hankijatele, et täita
riigihankeseadustiku II lisa punkti 4
nõudeid ja toetada neid e-riigihangete
protsessis, toetades digioskuste
omandamist ja pakkudes tehnilist tuge
riigihangete digitaliseerimise
kasutuselevõtmisel, sealhulgas
dünaamiliste hankesüsteemide
kasutamisel.
M1C1–76
Reform 1.11:
Riigiasutuste ja
tervishoiuasutust
e hilinenud
maksete
vähendamine
Siht
Vähendatakse
keskmist
päevade arvu,
mille jooksul
avaliku sektori
keskasutused
peavad
ettevõtjatele
makse maksma
PUUDUVAD
Kaalutud
keskmine
makseaeg
(päevades)
PUUDUVAD 30 1. kv 2025
Kommertskrediidi platvormi (Piattaforma Crediti Commerciali) andmete põhjal, mis on seotud 2024. aastal väljastatud arvetega, on avaliku sektori keskasutuste (Amministrazioni centrali) poolt ettevõtjatele tehtavate maksete puhul järgmised näitajad:
– kaalutud keskmise makseaja (tempo medio di pagamento ponderato) puhul:
55
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
kuni 30 päeva;
– kaalutud keskmine makseviivitus („tempo medio di ritardo ponderato“): maksimaalselt 0 päeva.
Peale selle ei tohi kaalumata keskmise makseaja (tempo medio di pagamento semplice) ja kaalutud keskmise makseaja vahe ületada 20 päeva, välja arvatud juhul, kui kaalumata keskmine makseaeg on alla 30 päeva.
M1C1–77
Reform 1.11:
Riigiasutuste ja
tervishoiuasutust
e hilinenud
maksete
vähendamine
Siht
Piirkondlike
ametiasutuste
keskmine
päevade arv,
mille jooksul nad
maksavad
ettevõtjatele, on
väiksem
PUUDUVAD
Kaalutud
keskmine
makseaeg
(päevades)
PUUDUVAD 30 1. kv 2025
Kommertskrediidi platvormi (Piattaforma Crediti Commerciali) andmete põhjal, mis on seotud 2024. aastal väljastatud arvetega, on piirkondlikelt avaliku sektori asutustelt (regioni– provintsi autonoomne piirkond) ettevõtjatele tehtavate maksete puhul järgmised näitajad:
- kaalutud keskmine makseaeg („tempo medio di pagamento ponderato“): kuni 30 päeva;
- kaalutud keskmine makseviivitus („tempo medio di ritardo ponderato“): maksimaalselt 0 päeva.
Peale selle ei tohi kaalumata keskmise
makseaja (tempo medio di pagamento
semplice) ja kaalutud keskmise makseaja
vahe ületada 20 päeva, välja arvatud
56
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
juhul, kui kaalumata keskmine makseaeg
on alla 30 päeva.
M1C1–78
Reform 1.11:
Riigiasutuste ja
tervishoiuasutust
e hilinenud
maksete
vähendamine
Siht
Kohalike
ametiasutuste
keskmine
päevade arv,
mille jooksul nad
maksavad
ettevõtjatele, on
väiksem
PUUDUVAD
Kaalutud
keskmine
makseaeg
(päevades)
PUUDUVAD 30 1. kv 2025
Kommertskrediidi platvormi (Piattaforma
Crediti Commerciali) andmete põhjal, mis
on seotud 2024. aastal väljastatud
arvetega, on kohalikelt avaliku sektori
asutustelt (enti locali) ettevõtjatele
tehtavate maksete puhul järgmised
näitajad:
- Kaalutud keskmine makseaeg („tempo medio di pagamento ponderato“): kuni 30 päeva;
- kaalutud keskmine makseviivitus („tempo medio di ritardo ponderato“): maksimaalselt 0 päeva.
Peale selle ei tohi kaalumata keskmise
makseaja (tempo medio di pagamento
semplice) ja kaalutud keskmise makseaja
vahe ületada 20 päeva, välja arvatud
juhul, kui kaalumata keskmine makseaeg
on alla 30 päeva.
M1C1–79
Reform 1.11:
Riigiasutuste ja
tervishoiuasutust
e hilinenud
maksete
Siht
Vähendatakse
keskmist
päevade arvu,
mille jooksul
riiklikud
PUUDUVAD
Kaalutud
keskmine
makseaeg
(päevades)
PUUDUVAD 60 1. kv 2025
Kommertskrediidi platvormi (Piattaforma
Crediti Commerciali) andmete põhjal, mis
on seotud 2024. aastal väljastatud
arvetega, on tervishoiuasutuste (enti del
Servizio sanitario nazionale) poolt
57
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
vähendamine tervishoiuasutus
ed maksavad
ettevõtjatele
ettevõtjatele tehtavate maksete puhul
järgmised näitajad:
– kaalutud keskmise makseaja (tempo
medio di pagamento ponderato) puhul:
maksimaalselt 60 päeva;
– kaalutud keskmine makseviivitus
(„tempo medio di ritardo ponderato“):
maksimaalselt 0 päeva;
Peale selle ei tohi kaalumata keskmise
makseaja (tempo medio di pagamento
semplice) ja kaalutud keskmise makseaja
vahe ületada 30 päeva, välja arvatud
juhul, kui kaalumata keskmine makseaeg
on alla 60 päeva.
M1C1–84
Reform 1.10:
Riigihangete
õigusraamistiku
reform
Siht
Avaldamise ja
lepingu
sõlmimise
vaheline
keskmine aeg
PUUDUVAD Number 139 100 4. kv 2023
Võttes aluseks Euroopa Liidu Teatajas
(andmebaas TED) vastu võetud meetodid
ja kasutades ANACi hallatava IT riikliku
riigihangete andmebaasi (BDNCP)
andmeid, vähendatakse pakkumuste
esitamise tähtaja ja lepingu sõlmimise
vahelist keskmist aega vähem kui 100
päevani lepingute puhul, mis ületavad ELi
riigihankedirektiivides sätestatud
piirmäärasid.
M1C1–84a Reform 1.10: Eesmärk Meetmed, mille Otsuste tegemise PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2024 Cabina di regia vastavalt artiklile
58
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
Riigihangete
õigusraamistiku
reform
eesmärk on
kiirendada
otsuste tegemist
avaliku sektori
hankijatega
lepingute
sõlmimisel
kiirusega seotud
meetmete
vastuvõtmine
Riigihankelepingute seadustiku artiklis
221 võetakse pärast ANACiga
konsulteerimist vastu:
–analüüs, milles hinnatakse e-riigihangete
mõju lepingu sõlmimise ajakavale alates
pakkumuste esitamise tähtajast kuni
lepingu allkirjastamiseni;
aruanne TEDi näitaja „Otsuse tegemise
kiirus“ 2024. aasta andmete kohta;
„Otsuse tegemise kiirus“ – ajavahemik
pakkumuste esitamise tähtaja ja lepingu
allkirjastamise kuupäeva vahel;
– aruanne avaliku sektori hankijate
parimate tavade kohta, mille eesmärk on
lühendada lepingute sõlmimise ajakava, ja
algatuste kohta, mille eesmärk on
lühendada otsuste tegemise kiirust.
Kvalifitseeritud avaliku sektori hankijad,
kelle keskmine otsuste tegemise aeg on
TEDis üle 160 päeva, peavad võtma
parandusmeetmeid.
M1C1–85 Reform 1.10:
Riigihangete
õigusraamistiku
Siht
Keskmine aeg
lepingu
sõlmimise ja
taristu rajamise
PUUDUVAD Protsent 100 90 2. kv 2024
Lepingu sõlmimise ja taristu rajamise
vahelist keskmist aega (edaspidi
„rakendusetapp“) vähendatakse vähemalt
10 %, võrreldes i) ajavahemikul 1.
59
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
reform vahel jaanuarist kuni 31. detsembrini 2019
tehtud ja 30. juuniks 2021 lõpetatud töid
ning ii) ajavahemikul 1. juulist 2021 kuni
30. juunini 2022 tehtud ja 31. detsembriks
2023 lõpetatud töid.
M1C1–86
Reform 1.10:
Riigihangete
õigusraamistiku
reform
Siht
Avaliku sektori
hankijate
kutseliseks
muutmise
strateegia
raames
koolitatud
ametnikud
PUUDUVAD Number 0 20 000 4. kv 2023 Avaliku sektori hankijate kutseliseks
muutmise strateegia raames on koolitatud
vähemalt 20000 ametnikku.
M1C1–87
Reform 1.10:
Riigihangete
õigusraamistiku
reform
Siht
Dünaamilisi
hankesüsteeme
kasutavad
avaliku sektori
hankijad
PUUDUVAD Protsent 0 15 4. kv 2023
Vähemalt 15 % avaliku sektori hankijatest
kasutab dünaamilisi hankesüsteeme
vastavalt ELi direktiivile 2014/24
(kaheaastane vaatlusperiood ja võttes
arvesse, et Itaalias kasutatakse DHSi
peamiselt piirmäära ületavate hangete
puhul, kuna piirmäärast allapoole jäävate
hangete puhul kasutatakse peamiselt e-
turge). Eesmärk on seotud keskvalitsuste
tasandi avaliku sektori hankijatega (250
makseasutust, mis registreeriti 30. aprilli
2021. aasta seisuga riiklikus e-
riigihangete süsteemis, mida haldab
Consip MEFi nimel).
60
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
M1C1–88
Reform 1.11:
Riigiasutuste ja
tervishoiuasutust
e hilinenud
maksete
vähendamine
Siht
Vähendatakse
keskmist
päevade arvu,
mille jooksul
avaliku sektori
keskasutused
peavad
ettevõtjatele
makse maksma
PUUDUVAD
Kaalutud
keskmine
makseaeg
(päevades)
PUUDUVAD 30 1. kv 2026
Kommertskrediidi platvormi (Piattaforma
Crediti Commerciali) andmete põhjal, mis
on seotud 2025. aastal väljastatud
arvetega, on avaliku sektori keskasutuste
(Amministrazioni centrali) poolt
ettevõtjatele tehtavate maksete puhul
järgmised näitajad:
– kaalutud keskmise makseaja (tempo
medio di pagamento ponderato) puhul:
kuni 30 päeva;
– kaalutud keskmine makseviivitus
(„tempo medio di ritardo ponderato“):
maksimaalselt 0 päeva;
Peale selle on kaalumata keskmise
makseaja („tempo medio di pagamento
semplice“) erinevus: ja kaalutud keskmine
makseaeg ei ületa 15 päeva, välja arvatud
juhul, kui kaalumata keskmine makseaeg
on alla 30 päeva.
M1C1–89
Reform 1.11:
Riigiasutuste ja
tervishoiuasutust
e hilinenud
maksete
vähendamine
Siht
Piirkondlike
ametiasutuste
keskmine
päevade arv,
mille jooksul nad
maksavad
ettevõtjatele, on
PUUDUVAD
Kaalutud
keskmine
makseaeg
(päevades)
PUUDUVAD 30 1. kv 2026
Tuginedes kommertskrediidi platvormi
(Piattaforma Crediti Commerciali)
andmetele 2025. aastal väljastatud arvete
kohta, on piirkondlike ametiasutuste
(regioni– provintsi autonoomne piirkond)
poolt ettevõtjatele tehtavate maksete
61
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
väiksem puhul järgmised näitajad:
- kaalutud keskmine makseaeg („tempo medio di pagamento ponderato“): kuni 30 päeva;
- kaalutud keskmine makseviivitus („tempo medio di ritardo ponderato“): maksimaalselt 0 päeva.
Peale selle ei tohi kaalumata keskmise
makseaja (tempo medio di pagamento
semplice) ja kaalutud keskmise makseaja
erinevus ületada 15 päeva, välja arvatud
juhul, kui kaalumata keskmine makseaeg
on alla 30 päeva.
M1C1–90
Reform 1.11:
Riigiasutuste ja
tervishoiuasutust
e hilinenud
maksete
vähendamine
Siht
Kohalike
ametiasutuste
keskmine
päevade arv,
mille jooksul nad
maksavad
ettevõtjatele, on
väiksem
PUUDUVAD
Kaalutud
keskmine
makseaeg
(päevades)
PUUDUVAD 30 1. kv 2026
Tuginedes kommertskrediidiplatvormi
(Piattaforma Crediti Commerciali)
andmetele 2025. aastal väljastatud arvete
kohta, on kohalikelt avaliku sektori
asutustelt (enti locali) ettevõtjatele
tehtavate maksete puhul järgmised
näitajad:
- kaalutud keskmine makseaeg („tempo medio di pagamento ponderato“): kuni 30 päeva;
- kaalutud keskmine makseviivitus („tempo medio di ritardo ponderato“): maksimaalselt 0 päeva.
Peale selle ei tohi kaalumata keskmise
62
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
makseaja (tempo medio di pagamento
semplice) ja kaalutud keskmise makseaja
erinevus ületada 15 päeva, välja arvatud
juhul, kui kaalumata keskmine makseaeg
on alla 30 päeva.
M1C1–91
Reform 1.11:
Riigiasutuste ja
tervishoiuasutust
e hilinenud
maksete
vähendamine
Siht
Vähendatakse
keskmist
päevade arvu,
mille jooksul
riiklikud
tervishoiuasutus
ed maksavad
ettevõtjatele
PUUDUVAD
Kaalutud
keskmine
makseaeg (jn
päeva)
PUUDUVAD 60 1. kv 2026
Tuginedes kommertskrediidi platvormi
(Piattaforma Crediti Commerciali)
andmetele 2025. aastal väljastatud arvete
kohta, on tervishoiuasutuste (enti del
Servizio sanitario nazionale) poolt
ettevõtjatele tehtavate maksete puhul
järgmised näitajad:
– kaalutud keskmise makseaja (tempo
medio di pagamento ponderato) puhul:
maksimaalselt 60 päeva;
– kaalutud keskmine makseviivitus
(„tempo medio di ritardo ponderato“):
maksimaalselt 0 päeva;
Peale selle ei tohi kaalumata keskmise
makseaja (tempo medio di pagamento
semplice) ja kaalutud keskmise makseaja
vahe ületada 20 päeva, välja arvatud
juhul, kui kaalumata keskmine makseaeg
on alla 60 päeva.
63
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
M1C1–96
Reform 1.10:
Riigihangete
õigusraamistiku
reform
Siht
Pakkumuste
vastuvõtmise
tähtaja ja lepingu
allkirjastamise
kuupäeva
vaheline
keskmine aeg
PUUDUVAD Protsent 100 80 4. kv 2025
Itaalia riikliku e-saatja (ANAC) Banca Dati
Nazionale Contratti Pubblici andmetest
saadud andmete põhjal vähendatakse
pakkumuste vastuvõtmise tähtaja ja
lepingu allkirjastamise kuupäeva vahelist
keskmist aega 12 kuu jooksul, võttes
aluseks lepingu allkirjastamise kuupäeva,
mis algab mitte varem kui 1. septembril 2024,
vähemalt 20 % võrreldes 2018. aasta
otsuse kiiruse näitajaga, mis on avaldatud
ELi ühtse turu tulemustabelis lepingute
kohta, mis ületavad ELi
riigihankedirektiivide künnist.
M1C1–97b
Reform 1.10:
Riigihangete
õigusraamistiku
reform
Eesmärk
Täitmise
kiirusega seotud
meetmed
Täitmise kiirusega
seotud meetmete
vastuvõtmine
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2025
a) Agenzia per l’Italia Digitale (AGID) veebisaidil avaldatakse uued tehnilised eeskirjad, mis võimaldavad koguda teavet riigihankelepingute täitmise digitaalseks järelevalveks.
b) Majandus- ja rahandusministeeriumi ning Autorità Nazionale Anticorruzione (ANAC) vahelise vastastikuse mõistmise memorandumi allkirjastamine, millega kehtestatakse tehnilised eeskirjad riigi rahanduse ja riiklike ehitustööde maksetega seotud andmete koostalitlusvõime kohta ANACi andmebaasiga (Banca Dati
64
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
Nazionale dei Contratti Pubblici).
c) Selliste õigusaktide jõustumine, mis võimaldavad avaliku sektori hankijatel ette näha ja kasutada baashinnast madalama hinnaga lepingute sõlmimisest tulenevat kokkuhoidu, et rahastada preemiaid ehitustööde varajase lõpetamise eest.
d) Taristu- ja transpordiministeeriumi veebisaidil avaldatakse suunised, mille taristu- ja transpordiministeerium võttis vastu pärast ANACiga konsulteerimist ja mis käsitlevad varase lõpetamise preemiaklausleid ja koostöölepingute vormilist sisu vastavalt seadusandliku dekreedi 36/2023 (riigihangete seadustik) artiklile 82a, et lühendada tööde lõpuleviimise aega.
e) Avaldatakse taristu- ja transpordiministeeriumi veebisaidil suunised, et toetada avaliku sektori hankijaid ehitusteabe modelleerimise (BIM) kasutamisel riiklike ehitustööde
65
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
puhul.
M1C1–98
Reform 1.10:
Riigihangete
õigusraamistiku
reform
Siht
Avaliku sektori
hankijate
kutseliseks
muutmise
strateegia
raames
koolitatud
ametnikud
PUUDUVAD Number 20 000 40 000 4. kv 2024 Avaliku sektori hankijate kutseliseks
muutmise strateegia raames on koolitatud
vähemalt 40 000 ametnikku.
M1C1–98a
Reform 1.10:
Riigihangete
õigusraamistiku
reform
Siht
Avaliku sektori
hankijate
kutseliseks
muutmise
strateegia
raames
koolitatud
ametnikud
PUUDUVAD Number 40 000 60 000 2. kv 2025
Avaliku sektori hankijate kutseliseks
muutmise strateegia raames on koolitatud
vähemalt 60 000 ametnikku. Koguarv võib
hõlmata riigiteenistujaid, kes on
varasematel aastatel juba koolitatud ja
kelle koolitusest on teatatud M1C1–86 ja
M1C1–98 eesmärkide puhul, üksnes
juhul, kui nad on läbinud kõrgema taseme,
eri- või täienduskoolituse.
M1C1–99
Reform 1.10:
Riigihangete
õigusraamistiku
reform
Siht
Dünaamilisi
hankesüsteeme
kasutavad
avaliku sektori
hankijad
Dünaamilist
hankesüsteemi
kasutavate
keskvalitsuse
hankijate protsent
vastavalt ELi
direktiivile 2014/24
Protsent 15 20 2. kv 2024
Vähemalt 20 % avaliku sektori hankijatest
kasutab direktiivi 2014/24 kohaseid
dünaamilisi hankesüsteeme
(vaatlusperiood algab 1. jaanuaril 2022).
Keskvalitsuse hankijad on 250 avalikku
haldust (registreeritud 30. aprilli 2021.
aasta seisuga riiklikus e-riigihangete
süsteemis, mida haldab Consip MEFi
nimel).
66
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
M1C1–100
Reform 1.13:
Kulude
läbivaatamise
raamistiku
reform
Eesmärk
Kulude
läbivaatamise
tulemuslikkust
parandavate
õigusnormide
jõustumine –
rahandusministe
eriumi
tugevdamine
Seaduse
jõustumisele viitav
õigusnorm
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2021
Keskvalitsuse (ministeeriumide) kulutuste
läbivaatamise läbivaadatud raamistik
parandab selle tõhusust, tugevdades
majandus- ja rahandusministeeriumi rolli.
Eelkõige nähakse sellega ette majandus-
ja rahandusministeeriumi suurem roll
eelhindamises, järelevalveprotsessides ja
järelhindamises, mis võimaldab tagada
läbivaatamiste põhjaliku läbiviimise ja
kavandatud eesmärkide saavutamise.
M1C1–101
Reform 1.12:
Maksuhalduse
reform
Eesmärk
Maksudest
kõrvalehoidumis
e vähendamise
võimalike
meetmete
läbivaatamise
vastuvõtmine
Ülevaate
avaldamine PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2021
Võtta vastu aruanne, et anda teavet
valitsuse meetmete kohta, mille eesmärk
on vähendada maksudest
kõrvalehoidumist, mis tuleneb arvete
esitamata jätmisest, eelkõige sektorites,
kus maksudest kõrvalehoidumise oht on
kõige suurem, sealhulgas tarbijatele
suunatud stiimulite kaudu.
M1C1–102
Reform 1.13:
Kulude
läbivaatamise
raamistiku
reform
Eesmärk
Valitud
haldusasutuste
poolt
säästukavade
koostamisel ja
rakendamisel
kasutatavate
tavade tõhusust
käsitleva
aruande
Aruande
avaldamine PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2022
Aruande koostab rahandusministeeriumi
raamatupidamisosakond koostöös valitud
ametiasutustega, et:
- Hindama nende tavasid säästukavade koostamisel ja rakendamisel.
- Määrata kindlaks suunised kõigile haldusasutustele.
67
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
vastuvõtmine
M1C1–103
Reform 1.12:
Maksuhalduse
reform
Eesmärk
Esmaste ja
teiseste
õigusaktide ja
õigusnormide
jõustumine ning
maksukuulekust
soodustavate
ning auditeid ja
kontrolle
parandavate
haldusmenetlust
e lõpuleviimine
Jõustumisele
viitavad õigus- ja
haldusnormid
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2022
Need sätted hõlmavad järgmist:
i) andmebaasi ja spetsiaalse IT-taristu
täielik kasutuselevõtt eelnevalt täidetud
käibedeklaratsiooni väljastamiseks, nagu
on sätestatud seadusandliku dekreedi nr
127/2015 artikli 4 lõikes 1.
ii) nõuetele vastavuse kirjade puhul
kasutatavat andmebaasi (varajane
teabevahetus maksumaksjatega, kelle
puhul avastatakse kõrvalekaldeid)
täiustatakse, et vähendada
valepositiivsete teadete arvu ja
suurendada maksumaksjatele
saadetavate teadete arvu.
iii) reformitud õigusaktide jõustumine, et
tagada tõhusad halduskaristused juhul,
kui eraõiguslikud teenuseosutajad
keelduvad elektroonilisi makseid vastu
võtmast (viide on dekreetseaduse
124/2019 algne artikkel 23, mis tunnistati
seaduseks muutmisel kehtetuks).
iv) Seaduse nr 160/2019 artikli 1 lõigetes
681–686 sätestatud andmete
pseudonüümimise protsessi lõpuleviimine
ja digitaristu loomine täielikult
pseudonüümitud andmebaaside
68
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
koostalitlusvõime kaudu loodud
suurandmete analüüsimiseks, et
suurendada valikumenetluse aluseks
oleva riskianalüüsi tõhusust.
v) Selliste esmaste ja teiseste õigusaktide
jõustumine, millega rakendatakse
täiendavaid tõhusaid meetmeid, mis
põhinevad selliste võimalike meetmete
läbivaatamise tulemustel, mille eesmärk
on vähendada maksudest
kõrvalehoidumist arvete esitamata jätmise
korral.
M1C1–104
Reform 1.13:
Kulude
läbivaatamise
raamistiku
reform
Eesmärk
Kulude
läbivaatamise
säästueesmärkid
e vastuvõtmine
aastateks 2023–
2025
Majandus- ja
rahandusdokumen
dis määratletud
keskvalitsuse
kogukulude
vähendamise
kvantitatiivne
eesmärk (eurodes)
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2022
Seadsid 2016. aasta dekreet-seaduste 90
ja 93 ning seaduse 163/2016 alusel
majandus- ja finantsdokumendis
eesmärgid keskvalitsuse koondkulude iga-
aastaseks läbivaatamiseks 2023., 2024. ja
2025. aastal. Säästueesmärgid peavad
olema piisavalt ambitsioonikad.
M1C1–105
Reform 1.12:
Maksuhalduse
reform
Siht Vastavuskirjade
suurem arv PUUDUVAD Number 2 150 908 2 581 090 4. kv 2022
Nõuete täitmist kinnitavate kirjade arvu,
millega teavitatakse varakult
maksumaksjaid, kelle puhul avastatakse
kõrvalekaldeid, suurendatakse 2019.
aastaga võrreldes vähemalt 20 %.
M1C1–106 Reform 1.12:
Maksuhalduse Siht Valepositiivsete
vastavuskirjade PUUDUVAD Number 126 500 132 825 4. kv 2022 Valepositiivsete „vastavuskirjade“ (millega
teavitatakse maksumaksjaid varakult
69
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
reform arvu
vähendamine
avastatud kõrvalekalletest, kuid mille
puhul ei avastata pettusi tagantjärele)
arvu vähendatakse 2019. aastaga
võrreldes vähemalt 5 %.
M1C1–107
Reform 1.12:
Maksuhalduse
reform
Siht
Vastavuskirjades
t tuleneva
maksutulu
suurenemine
PUUDUVAD Euro 2 130 000 000 2 449 500 000 4. kv 2022 Vastavuskirjadest saadav maksutulu
suureneb 2019. aastaga võrreldes 15 %.
M1C1–108
Reform 1.15:
Avaliku sektori
raamatupidamis
eeskirjade
reform
Eesmärk
Kontseptuaalse
raamistiku,
tekkepõhise
raamatupidamis
arvestuse
standardite
kogumi ja
mitmemõõtmelis
e kontoplaani
heakskiitmine
Rahandusministee
riumi
raamatupidamisos
akonna otsus
tekkepõhise
raamatupidamise
juhtimisstruktuuri
heakskiitmise
kohta
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2024
Tekkepõhise raamatupidamisarvestuse
süsteemi aluseks oleva kontseptuaalse
raamistiku väljatöötamine vastavalt
Eurostati määratletud kvalitatiivsetele
omadustele (EPSASe töörühm);
Rahvusvahelistel avaliku sektori
raamatupidamise standarditel (IPSAS)
põhinevate tekkepõhiste
raamatupidamisstandardite kehtestamine;
Mitmemõõtmelise ja mitmetasandilise
kontoplaani koostamine.
M1C1–109
Reform 1.12:
Maksuhalduse
reform
Siht
Esimeste
eeltäidetud
käibemaksudekl
aratsioonide
saatmine
PUUDUVAD Number 0 2 300 000 2. kv 2023 Vähemalt 2 300 000 maksumaksjat
saavad 2022. maksustamisaasta kohta
eelnevalt täidetud käibedeklaratsioonid.
70
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
M1C1–110
Reform 1.13:
Kulude
läbivaatamise
raamistiku
reform
Eesmärk
Riigieelarve
ümberliigitamine
keskkonnakulutu
ste ja soolist
võrdõiguslikkust
edendavate
kulutuste alusel
Riigieelarve
ümberliigitamise
lisamine 2024.
aasta
eelarveseadusess
e seoses
keskkonnakulude
ja soolist
võrdõiguslikkust
edendavate
kuludega
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2023
2024. aasta eelarveseadusega nähakse
parlamendile ette kestliku arengu eelarve,
mis koosneb riigieelarve liigitamisest
keskkonnakulude ja soolist
võrdõiguslikkust edendavate kulude
alusel. Liigitus peab olema kooskõlas
kestliku arengu eesmärkide ja kestliku
arengu tegevuskava 2030 eesmärkide
määratlemise aluseks olevate
kriteeriumidega.
M1C1–111
Reform 1.13:
Kulude
läbivaatamise
raamistiku
reform
Eesmärk
2023. aasta
kulude
läbivaatamise
lõpuleviimine
seoses 2022.
aastal 2023.
aastaks seatud
säästueesmärgi
ga
Rahandusministee
riumi 2023. aasta
kulude
läbivaatamise
aruande
vastuvõtmine,
millega
tõendatakse
protsessi
lõpuleviimist ja
eesmärgi
saavutamist.
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2024
Rahandusministri aruanne, mis
edastatakse ministrite nõukogule vastavalt
2016. aasta dekreet-seadustele nr 90 ja
93 ning seadusele nr 163/2016, peab:
–kinnitada 2023. aasta kulude
läbivaatamise protsessi lõpuleviimist
seoses kulude läbivaatamise raamistiku
sätetega.
–tõendada 2022. aastal seatud eesmärgi
saavutamist.
M1C1–112
Reform 1.12:
Maksuhalduse
reform
Siht
Parandada
maksuhalduri
tegevussuutlikku
st kooskõlas
maksuameti
PUUDUVAD Tööle võetud
töötajate arv 0 4 113 2. kv 2024
Maksuhaldur võtab tööle 4 113 uut
personaliüksust kooskõlas 2021.–2023.
aasta tulemuslikkuse kava
värbamiseesmärkidega.
71
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
2021.–2023.
aasta
tulemuslikkuse
kava
värbamiseesmär
kidega
M1C1–113
Reform 1.12:
Maksuhalduse
reform
Siht Vastavuskirjade
suurem arv PUUDUVAD Number 2 150 908 3 011 271 4. kv 2023
Nõuete täitmist kinnitavate kirjade arvu,
millega teavitatakse varakult
maksumaksjaid, kelle puhul avastatakse
kõrvalekaldeid, suurendatakse 2019.
aastaga võrreldes vähemalt 40 %.
M1C1–114
Reform 1.12:
Maksuhalduse
reform
Siht
Vastavuskirjades
t tuleneva
maksutulu
suurenemine
PUUDUVAD Euro 2 130 000 000 2 769 000 000 4. kv 2023 Vastavuskirjadest saadav maksutulu
suureneb 2019. aastaga võrreldes 30 %.
M1C1–115
Reform 1.13:
Kulude
läbivaatamise
raamistiku
reform
Eesmärk
2024. aasta
kulude
läbivaatamise
lõpuleviimine
seoses 2022. ja
2023. aastal
2024. aastaks
seatud
säästueesmärgi
ga
Rahandusministee
riumi 2024. aasta
kulude
läbivaatamise
aruande
vastuvõtmine,
millega
tõendatakse
protsessi
lõpuleviimist ja
eesmärgi
saavutamist.
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2025
Rahandusministri aruanne, mis
edastatakse ministrite nõukogule vastavalt
2016. aasta dekreet-seadustele nr 90 ja
93 ning seadusele nr 163/2016, peab:
– kinnitada, et 2024. aasta kulude
läbivaatamise protsess on kulude
läbivaatamise raamistiku sätete osas
lõpule viidud.
– tõendada 2022. ja 2023. aastal seatud
eesmärgi saavutamist.
72
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
M1C1–116
Reform 1.12:
Maksuhalduse
reform
Siht
Maksudest
kõrvalehoidumis
e vähendamine,
nagu on
määratletud
näitajaga
„Kindlustus
maksudest
kõrvale hoiduda“
PUUDUVAD Protsent 0 –10 4. kv 2025
Valitsuse ajakohastatud aruandes
varimajanduse kohta, mis avaldatakse
2025. aastal vastavalt seadusandliku
dekreedi nr 160/2015 artiklile 2,
kinnitatakse, et aastatel 2022–2023
vähendatakse kõigi maksude, välja
arvatud omandimaksud (Imposta
Municipale Unica) ja aktsiisid, maksmisest
kõrvalehoidmise tõenäosust keskmiselt
10% võrreldes 2019. aastaga.
M1C1–117
Reform 1.15:
Avaliku sektori
raamatupidamis
eeskirjade
reform
Siht
Uue tekkepõhise
raamatupidamis
süsteemi alase
koolituse läbinud
avaliku sektori
asutuste
esindajad
PUUDUVAD Protsent 0 90 1. kv 2026
Uut raamatupidamissüsteemi käsitlevate
koolituste keskselt digiplatvormilt saadud
andmete põhjal viivad uue tekkepõhise
raamatupidamissüsteemi põhikoolituse
läbi avaliku sektori asutuste esindajad,
kes katavad vähemalt 90 % kogu avaliku
sektori (v.a riigile kuuluvad ettevõtted)
esmastest kuludest.
M1C1–118
Reform 1.15:
Avaliku sektori
raamatupidamis
eeskirjade
reform
Eesmärk
Finantsaruannet
e avaldamine ja
avaliku sektori
asutuste
tekkepõhise
raamatupidamis
arvestuse
reformi käsitleva
seadusandliku
akti jõustumine,
Seadusandliku akti
säte, mis viitab
seadusandliku akti
jõustumisele.
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2026
Avaliku sektori raamatupidamiseeskirju
käsitleva seadusandliku akti katseetapina
koostatakse avaliku sektori asutuste kohta
avaliku halduse finantsaruanded, mis
katavad vähemalt 90 % kogu avaliku
sektori esmastest kuludest, v.a riigi
omanduses olevad äriühingud.
Lisaks jõustub seadusandlik akt, mis
sisaldab sätteid, millega volitatakse
avaliku sektori asutusi võtma 2030.
73
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
mis katab
vähemalt 90 %
kogu avaliku
sektori
esmastest
kuludest, v.a
riigile kuuluvad
ettevõtted.
aastaks (majandusaastaks) vastu uus
tekkepõhine raamatupidamissüsteem, mis
katab vähemalt 90 % kogu avaliku sektori
esmastest kuludest, v.a riigi omanduses
olevad äriühingud. Seadusandliku aktiga nõutakse ka
koolitusprogrammide korraldamist uuele
tekkepõhisele raamatupidamissüsteemile
üleminekuks.
Lisaks avaldatakse iga
raamatupidamisstandardi kohaldamise
suunised majandus- ja
rahandusministeeriumi veebisaidil.
M1C1–119
Reform 1.14:
Riigi tasandist
madalama
tasandi
eelarveraamistik
u reform
Eesmärk
Piirkondliku
fiskaalföderalism
i parameetrite
määratlemine
Esmaste
õigusaktide
jõustumine
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2026
Selliste esmaste õigusaktide jõustumine,
millega määratletakse fiskaalföderalismi
jaoks olulised teenuste tasemed („livelli
essenziali delle prestazioni“) vähemalt
kahes poliitikavaldkonnas tavastaatusega
piirkondades vastavalt 6. mai 2011. aasta
seadusandlikule dekreedile nr 68.
M1C1–120
Reform 1.14:
Riigi tasandist
madalama
tasandi
eelarveraamistik
u reform
Eesmärk
Provintside ja
suurlinnade
fiskaalföderalism
i määratlevate
õigusaktide
jõustumine.
Provintside ja
suurlinnade
fiskaalföderalismi
määratlevate
õigusaktide
jõustumine.
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2026
Provintside ja suurlinnade
fiskaalföderalismi määratlevate
õigusaktide jõustumine.
74
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
M1C1–121a
Reform 1.12:
Maksuhalduse
reform
Eesmärk
Maksude
kogumise
parandamist
käsitleva(te)
õigusakti(de)
jõustumine
Jõustumisele
viitava(te)
õigusakti(de)
sätted
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2026
Jõustub (jõustuvad) õigusakt(id), milles on
sätestatud, et:
1. E-arveldamisel saadud andmed
tehakse kättesaadavaks tasumata
maksukohustuse sissenõudmise eest
vastutavale ametile (Agenzia Entrate
Riscossione);
2. Maksude tasaarvestused on lubatud
ainult juhul, kui tasumata
maksukohustused ei ületa 50 000 eurot.
3. Maksuametil on lubatud saata
maksumaksjatele teateid, kui
elektroonilised arved on väljastatud, kuid
sama ajavahemiku kohta ei ole esitatud
käibedeklaratsiooni.
M1C1–122
Reform 1.13:
Kulude
läbivaatamise
raamistiku
reform
Eesmärk
2025. aasta
kulude
läbivaatamise
lõpuleviimine,
võttes arvesse
2022., 2023. ja
2024. aastal
2025. aastaks
seatud
säästueesmärki.
2025. aasta kulude
läbivaatamise
aruande
edastamine
rahandusministeeri
umi ministrite
nõukogule
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2026
Rahandusministri aruanne, mis
edastatakse ministrite nõukogule vastavalt
2016. aasta dekreet-seadustele nr 90 ja
93 ning seadusele nr 163/2016, peab:
– kinnitada 2025. aasta kulude
läbivaatamise protsessi lõpuleviimist
seoses kulude läbivaatamise raamistiku
sättega.
– tõendada 2022., 2023. ja 2024. aastal
seatud eesmärgi saavutamist.
75
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
M1C1–144
Investeering
1.4.2 – Kodanike
kaasamine –
digitaalsete
avalike teenuste
juurdepääsetavu
se parandamine
Siht
Digitaalsete
avalike
teenuste/sekkum
iste parem
kättesaadavus
PUUDUVAD Number 0 55 4. kv 2025
Lõpparuanded, milles kinnitatakse, et
vähemalt 55 haldusasutust on
rakendanud meetmeid, mis on ette nähtud
nende ja Agenzia per l’Italia Digitale
(AgID) vahelistes õiguslikes kokkulepetes,
et i) vähendada vähemalt kahe
digiteenuse puhul tuvastatud vigade liike
ja ii) pakkuda puuetega Palestiina
omavalitsuse töötajatele tugitehnoloogiat.
M1C1–147
Investeering 1.2
–
Pilvandmetöötlu
se võimaldamine
kohaliku
omavalitsuse
jaoks
Siht
Pilvandmetöötlu
se võimaldamine
kohalikule
avalikule
haldusele T2
PUUDUVAD Number 4 083 12 464 2. kv 2026
12 464 kohaliku haldusasutuse
migratsioon sertifitseeritud pilvekeskkonda
loetakse saavutatuks, kui kõigi igas
migratsioonikavas sisalduvate
süsteemide, andmekogumite ja
rakenduste migratsioon on edukalt
testitud.
M1C1–148
Investeering
1.4.1 – Kodanike
kogemused –
digitaalsete
avalike teenuste
kvaliteedi ja
kasutatavuse
parandamine
Siht
Digitaalsete
avalike teenuste
kvaliteedi ja
kasutatavuse
parandamine T2
PUUDUVAD Protsent 40 80 2. kv 2026
Haldusasutused (omavalitsused, alg- ja
keskkoolid, 1. ja 2. klassi
haridusasutused) järgivad veebisaitide ja
digiteenuste ühtset mudelit ja
disainisüsteemi, lihtsustades kasutajate
suhtlust ja lihtsustades hooldust.
Eesmärgi saavutamisse panustavad
omavalitsused järgivad ühist mudelit ja
disainisüsteemi keskmiselt vähemalt 3,5
teenuse puhul.
76
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
M1C1–149
Investeering
1.4.3 – PagoPA
platvormiteenust
e ja rakenduse
„IO“
kasutuselevõtt
Siht
PagoPA
platvormiteenust
e T2
kasutuselevõtu
suurendamine
PUUDUVAD Number 11 450 14 100 2. kv 2026
PagoPA platvormil peab olema vähemalt
14 100 haldusasutust, kes pakuvad
mitmeid teenuseid: keskmiselt 35 teenust
omavalitsustele, 15 piirkondadele, 15
tervishoiuasutustele ning 8 koolidele ja
ülikoolidele.
M1C1–151
Investeering
1.4.5 – Avalike
teadaannete
digitaliseerimine
Siht
Digitaalse
teavitusplatvormi
T2 vastuvõtmine
PUUDUVAD Number 800 6 400 2. kv 2026
Vähemalt 6 400 haldusasutust kasutavad
adressaatidele õiguslikult siduvate
digiteadete saatmiseks digitaalset
teavitusplatvormi.
M1C1–150
Investeering
1.4.3 – PagoPA
platvormiteenust
e ja rakenduse
„IO“
kasutuselevõtt
Siht
Rakenduse „IO“
T2
kasutuselevõtu
suurendamine
PUUDUVAD Number 7 000 14 100 2. kv 2026
Rakenduses „IO“ peab olema vähemalt
14 100 haldusasutust, kes pakuvad
mitmeid teenuseid: keskmiselt 35 teenust
omavalitsustele, 15 piirkonnale, 15
tervishoiuasutustele ning 8 koolidele ja
ülikoolidele.
M1C1–152
Investeering
1.6.1 –
Siseministeeriu
mi
digitaliseerimine
Siht
Siseministeeriu
m –
ümberprojekteeri
tud või
digiteeritud
protsessid või
teenused T2
PUUDUVAD Number 7 45 2. kv 2026 Siseministeeriumi protsessid või teenused
kujundatakse ümber või digiteeritakse.
M1C1–153 Investeering
1.6.2 –
Justiitsministeeri
Siht Digiteeritud
kohtutoimikud T2 PUUDUVAD Number 3 500 000 7 750 000 4. kv 2025
Viimase 20 aasta jooksul (1. jaanuar
2006–30.6.2026) lõpetatud või
pooleliolevate kohtumenetlustega seotud
77
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaari
um Eesmärk Nõuded Aasta
umi
digitaliseerimine
7 750 000 kohtutoimiku digiteerimine.
M1C1–154
Investeering
1.6.2 –
Justiitsministeeri
umi
digitaliseerimine
Siht
Õigusteabe järve
teadmussüstee
mid T2
PUUDUVAD Number 0 6 2. kv 2026
Kuue uue andmejärve käsitleva
teadmussüsteemi rakendamine:
1) Tsiviil- ja kriminaalkaristuste anonüümimise süsteem
2) Integreeritud juhtimissüsteem 3) Tsiviilmenetluste juhtimis- ja
analüüsisüsteem 4) Kriminaalmenetluste juhtimis- ja
analüüsisüsteem 5) Tsiviil- ja kriminaalmenetluste
täiustatud statistikasüsteem 6) Automatiseeritud süsteem ohvri ja
kuriteo toimepanija vahelise suhte kindlakstegemiseks.
M1C1–155
Investeering
1.6.3 – Riikliku
sotsiaalkindlustu
sinstituudi
(INPS) ja riikliku
tööõnnetuskindlu
stuse instituudi
(INAIL)
digitaliseerimine
Siht
INAIL –
ümberehitatud/di
giteeritud
protsessid/teenu
sed T2
PUUDUVAD Number 53 82 2. kv 2026 82 INAILi protsessi või teenust
kujundatakse ümber/digiteeritakse.
78
A.3. Laenuga seotud reformide ja investeeringute kirjeldus
Investeering 1.1 – Digitaristu
Selle investeeringu eesmärk on tagada, et avaliku halduse süsteeme, andmekogumeid ja rakendusi
majutatakse andmekeskustes, mis vastavad kõrgetele turvalisuse, jõudluse, skaleeritavuse, Euroopa
koostalitlusvõime ja energiatõhususe kvaliteedistandarditele. Investeering seisneb avaliku halduse
andmekogumite ja rakenduste üleviimises avaliku teenuse võrgule või turvalistele sertifitseeritud avaliku
pilveteenuse osutajatele.
Investeering 1.2 – Pilvandmetöötluse võimaldamine kohaliku omavalitsuse jaoks
Selle investeeringu eesmärk on viia olulise osa kohalike haldusasutuste andmekogumid ja rakendused üle
turvalisse pilvetaristusse, mis annab igale haldusasutusele vabaduse valida sertifitseeritud avalike
pilvekeskkondade vahel.
Meetmega nähakse ette ka haldusasutustele suunatud rände kui teenuse toetuspakett, mis hõlmab järgmist: i)
esialgne hindamine, ii) jõupingutuste käivitamiseks vajalik menetluslik/halduslik tugi, iii) läbirääkimised
vajaliku välistoe üle ja iv) projekti üldine juhtimine selle elluviimise ajal. Tehnoloogiliste uuenduste ja
digiülemineku ministeeriumi (MITD) järelevalve all tegutsev meeskond peaks tegema kindlaks ja
sertifitseerima suure hulga kvalifitseeritud teenuseosutajaid ning pidama läbirääkimisi standardsete
toetuspakettide üle, mis on kohandatud haldusasutuste ja üleminekuga seotud teenuste suurusele.
Investeering 1.4 – Digiteenused ja kodanike kogemused
Selle investeeringu eesmärk on töötada välja digitaalsete avalike teenuste integreeritud ja kodanikele
suunatud ökosüsteem, tagada nende laialdane kasutuselevõtt kesk- ja kohalikes haldusasutustes ning
suurendada üldist kasutajakogemust.
Abinõu:
vii) määratakse kindlaks korduskasutatavate teenuste osutamise mudelid, millega tagatakse täielikud
ligipääsetavusnõuded (investeering 1.4.1 – Kodanike kogemused – digitaalsete avalike teenuste
kvaliteedi ja kasutatavuse parandamine);
viii) suurendab digitaalsete avalike teenuste kättesaadavust (investeering 1.4.2 – Kodanike kaasamine:
Digitaalsete avalike teenuste juurdepääsetavuse parandamine);
ix) hõlmab kodanike ja haldusasutuste vaheliste maksete digitaalse rakenduse (PagoPa) ja rakenduse „IO“
kasutuselevõttu (investeering 1.4.3 – PagoPA platvormiteenuste ja rakenduse „IO“ kasutuselevõtt);
x) toetab riiklike digiidentiteedi platvormide (Sistema Pubblico di Identità Digitale, SPID ja Carta
d’Identità Elettronica, CIE) ja riikliku registri (Anagrafe nazionale della popolazione residente,
ANPR) kasutuselevõttu (investeering 1.4.4 – riiklike digiidentiteedi platvormide (SPID, CIE) ja
riikliku registri (ANPR) ulatuslikum kasutuselevõtt);
xi) luuakse ühtne teatamisplatvorm (investeering 1.4.5 – avalike teadaannete digitaliseerimine);
xii) hõlmab liikuvuse kui teenuse kasutuselevõttu (investeering 1.4.6 – Liikuvus kui Itaalia teenus,
kusjuures viimast meedet rahastatakse tagastamatust rahalisest toetusest).
Investeering 1.6 – Suurte keskvalitsuste digiüleminek
Selle investeeringu eesmärk on suurendada peamiste keskasutuste, sealhulgas i) riikliku
sotsiaalkindlustusinstituudi (INPS) ja riikliku tööõnnetuskindlustuse instituudi (INAIL), ii) kohtusüsteemi,
iii) kaitseministeeriumi, iv) siseministeeriumi ja v) finantspolitsei tõhusust ja lihtsustada nende menetlusi.
Investeering hõlmab nende pädevusse kuuluvate prioriteetsete protsesside, tegevuste ja teenuste
ümberkorraldamist ja digiteerimist.
79
A.4. Laenu vahe-eesmärgid, sihid, näitajad ning seire ja rakendamise ajakava
Järjekorra-
number
Seotud meede (reform
või investeering)
Eesmärk
/Siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaa
rium Eesmärk Nõuded Aasta
M1C1–14
Investeering 1.6.5:
Riiginõukogu
digiteerimine
Siht
Riiginõukogu –
kohtudokumendid on
analüüsimiseks
kättesaadavad
andmehoidlas T1
PUUDUVAD Number 0 800 000 4. kv 2023
Selliste halduskohtute
süsteemiga seotud
kohtudokumentide (nt
kohtuotsused, arvamused ja
dekreedid) arv, mille
metaandmed on andmelaos
täielikult kättesaadavad.
M1C1–16
Investeering 1.6.5:
Riiginõukogu
digiteerimine
Siht
Riiginõukogu –
kohtudokumendid on
analüüsimiseks
kättesaadavad
andmehoidlas T2
PUUDUVAD Number 800 000 2 500 000 4. kv 2023
Selliste halduskohtute
süsteemiga seotud
kohtudokumentide (nagu
kohtuotsused, arvamused ja
dekreedid) arv, mille
metaandmed on andmelaos
täielikult kättesaadavad.
M1C1–123
Investeering 1.6.3 –
Riikliku
sotsiaalkindlustusinstitu
udi (INPS) ja riikliku
tööõnnetuskindlustuse
instituudi (INAIL)
digitaliseerimine
Siht
INPS – „Üks
sisseprojekteeritud klõps“
teenused/sisu T1
PUUDUVAD Number 0 35 4. kv 2022
INPde institutsioonilisel
veebisaidil (www.inps.it ) on
kasutusele võetud 35
lisateenust.
Teenused peavad olema
institutsiooni veebisaidil
kättesaadavad asjakohaste
profiilianalüüsi loogikate kaudu
(süsteem soovitab teenuseid,
mis võivad pakkuda huvi vanuse,
80
Järjekorra-
number
Seotud meede (reform
või investeering)
Eesmärk
/Siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaa
rium Eesmärk Nõuded Aasta
tööomaduste, tajutava kasu ja
kasutajate ajaloo alusel).
35 teenust on seotud järgmiste
INPSi institutsiooniliste
valdkondadega:
•Pensionihüvitised
•Sotsiaalsed kiirabiautod
•Töötushüvitised
•Invaliidsushüvitised
•Tagasiostud
•Ettevõtete panuste kogumine
•Põllumajandustöötajate
teenused
•Pettusevastased,
korruptsioonivastased ja
läbipaistvusteenused
Loetletud institutsioonilistes
valdkondades rakendatavad
teenused on seotud teenuste
taotluste digitaalse esitamisega,
kasu saamise nõuete
kontrollimisega, kasutajate
tegevuse olukorra jälgimisega,
kasutajate vajadustel põhinevate
teenuste proaktiivse
81
Järjekorra-
number
Seotud meede (reform
või investeering)
Eesmärk
/Siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaa
rium Eesmärk Nõuded Aasta
pakkumisega, hüvitiste
automaatse uuendamisega ilma
vajaduseta uute rakenduste
järele.
Lisaks on olemas seiretabelid,
mis võimaldavad INPSil jälgida
nii saadavat kasu kui ka
andmepõhist tuge
poliitikakujundajate otsustele.
M1C1–124
Investeering 1.6.3 –
Riikliku
sotsiaalkindlustusinstitu
udi (INPS) ja riikliku
tööõnnetuskindlustuse
instituudi (INAIL)
digitaliseerimine
Siht
INPS – täiustatud info- ja
kommunikatsioonitehnoloo
gia (IKT) oskustega
töötajad T1
PUUDUVAD Number 0 4 250 4. kv 2022
Vähemalt 4 250 INPSi töötajat,
keda on hinnatud seoses nende
teabega ja kellel on tõendatud
paremad oskused järgmistes
Euroopa e-pädevuste raamistiku
valdkondades: i) kava; ii) ehitus;
iii) Run (iv) Enable
(võimaldatav); v) haldamine.
Pädevuste parandamise
valdkonnad määratakse kindlaks
vastavalt õppijate sihtrühmale.
M1C1–125
Investeering 1.2 –
Pilvandmetöötluse
võimaldamine kohaliku
omavalitsuse jaoks
Eesmärk
(Kõikide)
pilvandmetöötluse
võimaldamise avalike
hangete lepingute
sõlmimine kohaliku avaliku
Teade (kõikide)
riigihankelepingute
sõlmimise kohta
seoses
pilvandmetöötluse
PUUDUVAD PUUDUVAD PUUDUVAD 1. kv 2023
Teade (kõikide) avalike
projektikonkursside korraldamise
kohta iga kaasatud avaliku
halduse liigi (omavalitsused,
koolid, kohalikud
82
Järjekorra-
number
Seotud meede (reform
või investeering)
Eesmärk
/Siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaa
rium Eesmärk Nõuded Aasta
halduse hangete jaoks võimaldamisega
kohaliku avaliku
halduse hangeteks
tervishoiuasutused) jaoks, et
koguda ja hinnata rändekavasid.
Kolme sihtotstarbelise
projektikonkursi väljakuulutamine
võimaldab tehnoloogilise
innovatsiooni ja digiülemineku
ministeeriumil hinnata iga
asjaomase avaliku halduse liigi
väga spetsiifilisi vajadusi.
Sõlmitud pakkumused (st
rahastamisloa saanud
haldusasutuste loetelu
avaldamine) olid seotud kolme
avaliku projektikonkursiga, mis
olid suunatud vastavalt
omavalitsustele, koolidele ja
kohalikele tervishoiuasutustele,
et koguda ja hinnata
rändekavasid kooskõlas
põhimõtte „ei kahjusta oluliselt“
tehniliste suunistega
(2021/C58/01), kasutades
välistamisnimekirja ning nõuet
järgida asjakohaseid ELi ja
riiklikke keskkonnaalaseid
õigusakte.
83
Järjekorra-
number
Seotud meede (reform
või investeering)
Eesmärk
/Siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaa
rium Eesmärk Nõuded Aasta
M1C1–126
Investeering 1.4.3 –
PagoPA
platvormiteenuste ja
rakenduse „IO“
kasutuselevõtt
Siht
PagoPA platvormiteenuste
T1 kasutuselevõtu
suurendamine
PUUDUVAD Number 9 000 11 450 4. kv 2023
Tagada platvormi integreeritud
teenuste arvu suurenemine:
– haldusasutused juba
lähtestsenaariumis (9 000
üksust)
– platvormiga ühinevad uued
haldusasutused (2 450 uut
üksust).
Mõlemal juhul peab platvormiga
ühinevate haldusasutuste
teenuste koguarv suurenema
vähemalt 20 % võrreldes 2021.
aasta teenuste lähtetasemega
(31.3.2021). Integreeritavate
teenuste arv sõltub haldusliigist
(2026. aasta lõppeesmärk on
pakkuda omavalitsustele
keskmiselt 35 teenust,
piirkondadele 15 teenust,
tervishoiuasutustele 15 teenust,
koolidele ja ülikoolidele 8
teenust).
M1C1–127 Investeering 1.4.3 –
PagoPA
platvormiteenuste ja
Siht Rakenduse „IO“ T1
kasutuselevõtu PUUDUVAD Number 2 700 7 000 4. kv 2023
Tagada, et info- ja
kommunikatsioonitehnoloogia
rakendusse „Taotleda:
84
Järjekorra-
number
Seotud meede (reform
või investeering)
Eesmärk
/Siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaa
rium Eesmärk Nõuded Aasta
rakenduse „IO“
kasutuselevõtt
suurendamine – haldusasutused juba
lähtestsenaariumis (2 700
üksust)
– platvormiga ühinevad uued
haldusasutused (4 300 uut
üksust).
Mõlemal juhul peab platvormiga
ühinevate haldusasutuste
teenuste koguarv suurenema
vähemalt 20 % võrreldes 2021.
aasta teenuste lähtetasemega
(31.3.2021). Integreeritavate
teenuste arv sõltub haldusliigist
(2026. aasta lõppeesmärk on
pakkuda omavalitsustele
keskmiselt 35 teenust,
piirkondadele 15 teenust,
tervishoiuasutustele 15 teenust,
koolidele ja ülikoolidele 8
teenust).
M1C1–128
Investeering 1.4.5 –
Avalike teadaannete
digitaliseerimine
Siht
Digitaalsete avalike
teadaannete T1
kasutuselevõtu
laiendamine
PUUDUVAD Number 0 800 4. kv 2023
Vähemalt 800 avaliku halduse
keskasutust ja omavalitsust
esitavad seoses digitaalse
teavitusplatvormiga kodanikele,
juriidilistele isikutele,
ühendustele ja muudele avaliku
85
Järjekorra-
number
Seotud meede (reform
või investeering)
Eesmärk
/Siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaa
rium Eesmärk Nõuded Aasta
või erasektori üksustele
digitaalseid õiguslikult siduvaid
teateid.
M1C1–129
Investeering 1.6.1 –
Siseministeeriumi
digitaliseerimine
Siht
Siseministeerium –
täielikult ümberkujundatud
ja digiteeritud protsessid
T1
PUUDUVAD Number 0 7 4. kv 2023
Täielikult ümberkujundatud
sisemenetlused ja -protsessid
(kuni 31. detsembrini 2023 kokku
seitse protsessi), mida saab
täielikult lõpule viia veebis (nt
bürooautomaatika,
liikuvusteenused ja e-õpe).
M1C1–130
Investeering 1.6.2 –
Justiitsministeeriumi
digitaliseerimine
Siht Digiteeritud kohtutoimikud
T1 PUUDUVAD Number 0 3 500 000 4. kv 2023
Viimase 20 aasta jooksul (1.
jaanuar 2006–30.6.2026)
lõpetatud või pooleliolevate
kohtumenetlustega seotud
3 500 000 kohtutoimiku
digiteerimine.
M1C1–131
Investeering 1.6.2 –
Justiitsministeeriumi
digitaliseerimine
Eesmärk Õigusteabe järve
teadmussüsteemid T1
Lepingu täitmise
algust tõendav
aruanne
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2023
Kuue uue andmejärve
teadmussüsteemi
väljaarendamise lepingu täitmise
algus:
1) Tsiviil- ja kriminaalkaristuste anonüümimise süsteem
2) Integreeritud juhtimissüsteem
3) Tsiviilmenetluste juhtimis- ja analüüsisüsteem
86
Järjekorra-
number
Seotud meede (reform
või investeering)
Eesmärk
/Siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaa
rium Eesmärk Nõuded Aasta
4) Kriminaalmenetluste juhtimis- ja analüüsisüsteem
5) Tsiviil- ja kriminaalmenetluste täiustatud statistikasüsteem
6) Automatiseeritud süsteem ohvri-süüdistuse suhte tuvastamiseks.
Iga riigihankelepingu täitmine
algab menetluse eest vastutava
isiku konkreetse haldusaktiga,
mida nimetatakse „täitmise
alustamiseks“.
M1C1–132
Investeering 1.6.3 –
Riikliku
sotsiaalkindlustusinstitu
udi (INPS) ja riikliku
tööõnnetuskindlustuse
instituudi (INAIL)
digitaliseerimine
Siht
INPS – „Üks
sisseprojekteeritud klõps“
teenused/sisu T2
PUUDUVAD Number 35 70 4. kv 2023
Inpsi institutsiooni veebisaidil
(www.inps.it) on kasutusele
võetud 35 lisateenust.
Teenused peavad olema
institutsiooni veebisaidil
kättesaadavad asjakohaste
profiilianalüüsi loogikate kaudu
(süsteem peab soovitama
teenuseid, mis võivad pakkuda
huvi vanuse, tööomaduste,
tajutava kasu ja kasutajate
ajaloo alusel).
87
Järjekorra-
number
Seotud meede (reform
või investeering)
Eesmärk
/Siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaa
rium Eesmärk Nõuded Aasta
35 teenust on seotud järgmiste
INPSi institutsiooniliste
valdkondadega:
•Pensionihüvitised
•Sotsiaalsed kiirabiautod
•Töötushüvitised
•Invaliidsushüvitised
•Tagasiostud
•Ettevõtete panuste kogumine
•Põllumajandustöötajate
teenused
•Pettusevastased,
korruptsioonivastased ja
läbipaistvusteenused
Loetletud institutsioonilistes
valdkondades rakendatavad
teenused on seotud teenuste
taotluse digitaalse esitamisega,
kasu saamise nõuete
kontrollimisega, kasutajate
tegevuse olukorra jälgimisega,
88
Järjekorra-
number
Seotud meede (reform
või investeering)
Eesmärk
/Siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaa
rium Eesmärk Nõuded Aasta
teenuste proaktiivse
pakkumisega vastavalt
kasutajate vajadustele, hüvitiste
automaatse uuendamisega ilma
vajaduseta uute rakenduste
järele.
Lisaks on olemas seiretabelid,
mis võimaldavad INPSil jälgida
nii saadavat kasu kui ka
andmepõhist tuge
poliitikakujundajate otsustele.
89
Järjekorra-
number
Seotud meede (reform
või investeering)
Eesmärk
/Siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaa
rium Eesmärk Nõuded Aasta
M1C1–133
Investeering 1.6.3 –
Riikliku
sotsiaalkindlustusinstitu
udi (INPS) ja riikliku
tööõnnetuskindlustuse
instituudi (INAIL)
digitaliseerimine
Siht
INPS – paremate info- ja
kommunikatsioonitehnoloo
giaalaste oskustega
töötajad T2
PUUDUVAD Number 4 250 8 500 4. kv 2023
Veel 4 250 INPSi töötajat, kellel
on tõendatud paremad oskused
järgmistes Euroopa e-pädevuste
raamistiku valdkondades: i)
kava; ii) ehitus; iii) Run (iv)
Enable (võimaldatav); v)
haldamine.
Pädevuse parandamise
valdkonnad määratakse kindlaks
vastavalt õppijate sihtrühmale.
M1C1–134
Investeering 1.6.3 –
Riikliku
sotsiaalkindlustusinstitu
udi (INPS) ja riikliku
tööõnnetuskindlustuse
instituudi (INAIL)
digitaliseerimine
Siht
INAIL – täielikult
ümberprojekteeritud ja
digiteeritud
protsessid/teenused T1
PUUDUVAD Number 29 53 4. kv 2023
Eesmärk on saavutada 53
(52 %) ümberkujundatud
institutsioonilist protsessi ja
teenust, et need täielikult
digiteerida.
Asjaomased INAILi piirkonnad
on: Kindlustus, sotsiaal- ja
tervishoiuteenused, ennetus- ja
ohutustöö, sertifitseerimine ja
kontroll.
90
Järjekorra-
number
Seotud meede (reform
või investeering)
Eesmärk
/Siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaa
rium Eesmärk Nõuded Aasta
Eelkõige on eespool esitatud iga
valdkonna eeldatav eesmärk:
• Kindlustus: 8 (25 %);
• Sotsiaal- ja tervishoiuteenused: 18 (50 %);
• Ennetus- ja ohutustöö: 9 (80 %);
• Sertifitseerimine ja kontroll: 18 (80 %).
M1C1–135
Investeering 1.6.4 –
Kaitseministeeriumi
digitaliseerimine
Siht
Kaitseministeerium –
protseduuride T1
digitaliseerimine
PUUDUVAD Number 4 15 4. kv 2023
Kaitsepersonali juhtimisega
seotud 15 menetluse (nt
värbamine, tööhõive ja
pensionile jäämine, töötajate
tervis) digiteerimine,
läbivaatamine ja
automatiseerimine, alustades
neljast juba digiteeritud
menetlusest.
M1C1–136
Investeering 1.6.4 –
Kaitseministeeriumi
digitaliseerimine
Siht
Kaitseministeerium –
sertifikaatide T1
digiteerimine
PUUDUVAD
Digiteeritud
sertifikaatide
arv
190 000 450 000 4. kv 2023
Kaitseministeeriumi välja antud
ja taristus kasutatavate
digiteeritud isikut tõendavate
dokumentide arv (450 000), mida
täiendab avariitaastekoht,
alustades lähtetasemest, milleks
on 190 000 juba digiteeritud
91
Järjekorra-
number
Seotud meede (reform
või investeering)
Eesmärk
/Siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaa
rium Eesmärk Nõuded Aasta
tõendit.
M1C1–137
Investeering 1.6.4 –
Kaitseministeeriumi
digitaliseerimine
Eesmärk
Kaitseministeerium –
institutsiooniliste
veebiportaalide ja
intranetiportaalide
kasutuselevõtmine
Institutsioonilised
veebiportaalid ja
intraneti
veebiportaalid
toimivad täielikult
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2023
i) institutsiooniliste
veebiportaalide ja ii) sisesuhtluse
erivajadustele vastavate
intranetiportaalide väljatöötamine
ja rakendamine.
M1C1–138
Investeering 1.6.4 –
Kaitseministeeriumi
digitaliseerimine
Siht
Kaitseministeerium –
missiooniväliste kriitilise
tähtsusega rakenduste
migratsioon taristu
avatusest lähtuva täieliku
teabekaitse lahendusse
(S.C.I.P.I.O.) T1
PUUDUVAD Number 0 10 4. kv 2023
Heiteta elutähtsate rakenduste
esialgne migratsioon ja
operatiivne kättesaadavus uude
avatud lähtekoodiga taristusse.
See hõlmab riistvarakeskkonna
rakendamist, vahevara avatud
lähtekoodiga komponentide
paigaldamist ja rakenduste
ümberkujundamist.
M1C1–139
Investeering 1.2 –
Pilvandmetöötluse
võimaldamine kohaliku
omavalitsuse jaoks
Siht
Pilvandmetöötluse
võimaldamine kohalikule
avalikule haldusele T1
PUUDUVAD Number 0 4 083 3. kv 2024
4 083 kohaliku haldusasutuse
migratsioon sertifitseeritud
pilvekeskkonda loetakse
saavutatuks, kui kõigi igas
üleminekukavas sisalduvate
süsteemide, andmekogumite ja
rakenduste migratsioon on
edukalt testitud.
M1C1–140 Investeering 1.4.1 –
Kodanike kogemused – Siht Digitaalsete avalike
teenuste T1 kvaliteedi ja PUUDUVAD Protsent 0 40 4. kv 2024 Haldusasutused (omavalitsused,
esimese ja teise astme
92
Järjekorra-
number
Seotud meede (reform
või investeering)
Eesmärk
/Siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaa
rium Eesmärk Nõuded Aasta
digitaalsete avalike
teenuste kvaliteedi ja
kasutatavuse
parandamine
kasutatavuse
parandamine
haridusasutuste põhi- ja
keskkoolid ning konkreetsed
katselised tervishoiu- ja
kultuuripärandiüksused), mis
järgivad ühist mudeli- ja
disainisüsteemi, lihtsustades
kasutajate suhtlust ja
lihtsustades hooldust järgnevatel
aastatel.
Veebisaitide/teenuste
komponentide ühise
disaini/mudeli järgimine hõlmab
järgmist:
1) Esitatud projektide hindamine;
2) Projekti lõpuleviimise
hindamine peamiste
kasutatavuse parameetrite
(digitaalse kasutatavuse hinded)
alusel spetsiaalse platvormi
kaudu, mis on juba kättesaadav.
M1C1–141
Investeering 1.6.4 –
Kaitseministeeriumi
digitaliseerimine
Siht
Kaitseministeeriumi
menetluste
digitaliseerimine T2
PUUDUVAD Number 15 20 4. kv 2024
Kaitsepersonali juhtimisega
seotud 20 menetluse (nt
värbamine, tööhõive ja
pensionile jäämine, töötajate
tervis) digiteerimine,
93
Järjekorra-
number
Seotud meede (reform
või investeering)
Eesmärk
/Siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaa
rium Eesmärk Nõuded Aasta
läbivaatamine ja
automatiseerimine, alustades 15
juba digiteeritud menetlusest,
mille eesmärk on 1.
M1C1–142
Investeering 1.6.4 –
Kaitseministeeriumi
digitaliseerimine
Siht
Kaitseministeeriumi
tõendite digitaliseerimine
T2
PUUDUVAD
Digiteeritud
sertifikaatide
arv
450 000 750 000 4. kv 2024
Taristus kasutatavate ja
kaitseministeeriumi välja antud
digiteeritud isikut tõendavate
dokumentide (750 000) arv, mida
täiendab avariitaastekoht,
alustades lähtetasemest, milleks
on 450 000 juba digiteeritud
tõendit eesmärgiga 1.
M1C1–143
Investeering 1.6.4 –
Kaitseministeeriumi
digitaliseerimine
Siht
Kaitseministeerium –
missiooni jaoks kriitilise
tähtsusega ja
mittekriitiliste rakenduste
migratsioon taristu
avatuse kaudu täieliku
teabekaitse lahendusse
(S.C.I.P.I.O.) T2
PUUDUVAD Number 10 15 4. kv 2024
Nelja missiooni jaoks kriitilise
tähtsusega ja üheteistkümne
missioonivälise kriitilise
tähtsusega rakenduse lõplik
migratsioon uude avatud
lähtekoodiga taristusse, mis
hõlmab riistvarakeskkonna
rakendamist, vahevara avatud
lähtekoodiga komponentide
paigaldamist, rakenduste
ümberkujundamist, alustades
lähtetasemest, milleks on
kümme rakendust, mis on juba
1. sihiga üle viidud.
94
Järjekorra-
number
Seotud meede (reform
või investeering)
Eesmärk
/Siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaa
rium Eesmärk Nõuded Aasta
M1C1–145
Investeering 1.4.4 –
Riiklike digiidentiteedi
platvormide (SPID, CIE)
ja riikliku registri
(ANPR) kasutuselevõtu
laiendamine
Siht
Riiklik digiidentiteedi
platvorm (CIE) ja riiklik
register (ANPR)
PUUDUVAD Number 9 700 000 42 300 000 4. kv 2025
Riiklikul digiidentiteedi platvormil
on registreeritud 42 300 000
isikut, kellel on kehtiv
digiidentiteet.
M1C1–146
Investeering 1.4.4 –
Riiklike digiidentiteedi
platvormide (SPID, CIE)
ja riikliku registri
(ANPR) kasutuselevõtt
Siht Riiklikud digiidentiteedi
platvormid (SPID) PUUDUVAD Number 0 10 217 2. kv 2025
10 217 üksust võttis e-identimise
(eID) kasutusele avaliku
digiidentiteedi süsteemi (SPID)
kaudu pärast 3. detsembrit 2021.
M1C1–26 Investeering 1.1:
Digitaristu Siht
Migratsioon Polo
Strategico Nazionalesse
või turvalisse
sertifitseeritud avalikku
pilvekeskkonda
PUUDUVAD Number 100 280 2. kv 2026
Vähemalt 280 avaliku halduse
keskasutust ja kohalikku
tervishoiuasutust (Aziende
Sanitarie Locali/Aziende
Ospedaliere) on läinud üle
platvormile „Polo Strategico
Nazionale“ (PSN) või turvalisse
sertifitseeritud avalikku
pilvekeskkonda vastavalt
üleminekukavale, mille on heaks
kiitnud digipöörde osakond.
Migratsioon võib toimuda eri
viisidel vastavalt kohapealse
tarkvara IT-arhitektuuri tehnika
95
Järjekorra-
number
Seotud meede (reform
või investeering)
Eesmärk
/Siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaa
rium Eesmärk Nõuded Aasta
tasemele, mis kuulub igale
migreeruvale avalikule
haldusele.
Need strateegiad võivad
varieeruda puhtmajutusest ning
pilvevalmiduseta tarkvara üles-
ja väljavahetamisest kuni
üleminekuni teenusena toimivale
taristule (IaaS), teenusena
toimivale platvormile (PaaS) või
teenusena toimivale tarkvarale
(SaaS).
Vähemalt 40 % migreeritud
teenustest rakendatakse kas
IaaSi, PaaSi või SaaSi
lahenduste kaudu.
96
B. ÜLESANDE 1 KOMPONENT 2:
Telg – Tootmissüsteemi digitaliseerimine, innovatsioon ja konkurentsivõime
Itaalia taaste- ja vastupidavuskava 1. ülesande 2. komponendi 1. telg puudutab investeeringuid ja
reforme, mille peamine eesmärk on i) toetada digipööret ja tootmissüsteemi innovatsiooni
tehnoloogiasse, teadus- ja arendustegevusse ning innovatsiooni investeerimise stiimulite kaudu; ii)
võtta kasutusele ülikiired lairiba- ja 5G-võrgud, et vähendada digitaalset lõhet, ning satelliitide
kogumid ja teenused; iii) strateegiliste väärtusahelate arendamise edendamine ja ettevõtete
konkurentsivõime toetamine, keskendudes VKEdele.
Selle komponendi meetmete eesmärk on kõrvaldada 2020. aasta digitaalmajanduse ja -ühiskonna
indeksist (DESI) tulenevad puudujäägid ettevõtete digipöördes ja ühenduvuses, et tugevdada riigi
sotsiaalset ja majanduslikku vastupanuvõimet.
Selle komponendi raames tehtavad investeeringud ja reformid aitavad täita 2020. ja 2019. aastal
Itaaliale esitatud riigipõhiseid soovitusi vajaduse kohta „tugevdada kaugõpet ja -oskusi, sealhulgas
digioskusi“ (riigipõhine soovitus 2, 2020), „edendada erasektori investeeringuid majanduse taastumise
soodustamiseks“ (riigipõhine soovitus 3, 2020), „keskenduda investeeringute tegemisel rohe- ja
digipöördele, eelkõige [...] tugevdatud digitaristule, et tagada oluliste teenuste osutamine“ (riigipõhine
soovitus 3, 2020), „edendada oskuste täiendamist, sealhulgas digioskuste tugevdamise kaudu“
(riigipõhine soovitus 2, 2019), „keskenduda investeeringutega seotud majanduspoliitikas
teadusuuringutele ja innovatsioonile ning taristu kvaliteedile, võttes arvesse ka piirkondlikke
erinevusi“ (riigipõhine soovitus 3, 2019) ning teataval määral „toetada uuenduslike ja väiksemate
ettevõtete pangavälist juurdepääsu rahastamisele“ (riigipõhine soovitus 5, 2019).
Lähtudes meetmete kirjeldusest taaste- ja vastupidavuskavas ja võttes arvesse põhimõtte „Ei kahjusta
oluliselt“ tehniliste suuniste (2021/C58/01) kohaseid leevendavaid samme, mis kavas on sätestatud,
võib eeldada, et ükski selle komponendi meede ei kahjusta määruse (EL) 2020/852 artikli 17
tähenduses oluliselt keskkonnaeesmärke.
Telg – Ärikeskkonna ja konkurentsi parandamine
Ülesande 1 komponendi 2 2. telje peamine eesmärk on parandada ettevõtluskeskkonda, et hõlbustada
ettevõtlust, ning konkurentsi raamtingimusi, et soodustada ressursside tõhusamat jaotamist ja
tootlikkuse kasvu. Peamine vahend nende eesmärkide saavutamiseks on iga-aastane
konkurentsiseadus, mis võetakse vastu igal aastal.
Selle komponendi raames tehtavad investeeringud ja reformid aitavad järgida 2019. aastal Itaaliale
esitatud riigipõhiseid soovitusi vajaduse kohta „käsitleda konkurentsipiiranguid [...], muu hulgas uue
iga-aastase konkurentsiseaduse kaudu“ (riigipõhine soovitus 3, 2019).
B.1. Tagastamatu rahalise toetusega seotud reformide ja investeeringute kirjeldus
Telg – Tootmissüsteemi digitaliseerimine, innovatsioon ja konkurentsivõime
Investeering 1: Üleminek 4.0
Meetme eesmärk on toetada ettevõtete digipööret, stimuleerides erainvesteeringuid digiteerimist
toetavatesse varadesse ja tegevustesse. Meede koosneb maksukrediidi kavast.
Reform 1: Tööstusomandi süsteemi reform
Reformi peamine eesmärk on kohandada tööstusomandi süsteem tänapäevaste probleemidega ning
tagada, et innovatsioonipotentsiaal aitab kaasa riigi taastumisele ja vastupanuvõimele. Täpsemalt on
selle eesmärk saavutada järgmised eesmärgid: tööstusomandi kaitse süsteemi tõhustamine;
97
tööstusomandi kasutamise ja levitamise soodustamine, eelkõige VKEde poolt; immateriaalsele varale
juurdepääsu ja selle jagamise hõlbustamine, tagades samal ajal õiglase investeeringutasuvuse;
tööstusomandi rangema austamise tagamine; ning Itaalia rolli tugevdamine tööstusomandit
käsitlevatel Euroopa ja rahvusvahelistel foorumitel.
Meede käsitleb Itaalia tööstusomandi seadustiku reformi, mis hõlmab vähemalt järgmisi valdkondi: i)
vaadata läbi õigusraamistik, et tugevdada tööstusomandi õiguste kaitset ja lihtsustada menetlusi, ii)
tugevdada toetust ettevõtetele ja teadusasutustele, iii) edendada oskuste ja pädevuste arendamist, iv)
hõlbustada teadmussiiret ning v) tugevdada uuenduslike teenuste edendamist.
Investeering 6: Investeeringud tööstusomandi süsteemi
Investeeringu eesmärk on toetada tööstusomandi süsteemi ja toetada selle reformi, nagu on ette
nähtud selle komponendi 1. reformiga. Meede hõlmab rahalist toetust ettevõtete ja teadusasutuste
tööstusomandiga seotud projektidele järgmistel eesmärkidel: patentidega seotud meetmed (Brevetti+),
kontseptsiooni tõestamise programmid ja tehnosiirdekeskuste tugevdamine.
Telg – Ärikeskkonna ja konkurentsi parandamine
Reform 2: 2022., 2023., 2024. ja 2025. aasta konkurentsiseadused
Igal aastal võetakse vastu konkurentsiseadus, millega laiendatakse konkurentsipõhiseid menetlusi
avaliku teenindamise lepingute sõlmimiseks kohalike avalike teenuste (sealhulgas vesi, jäätmed ja
kohalik ühistransport) osutamiseks, vältides kontsessioonide põhjendamatut pikendamist turgu
valitsevatele ettevõtjatele paljudes sektorites, sealhulgas sadamates, maanteedel, hüdroenergias ja
piirkondlikus transpordis, nähes ette avaliku teenindamise lepingute nõuetekohase reguleerimise,
vaadates läbi liitmise eeskirjad ja kohaldades üldist proportsionaalsuse põhimõtet avaliku
teenindamise lepingute kestuse ja nõuetekohase hüvitamise suhtes. Konkurentsiseadused toetavad
konkurentsi ja piirkondlike transporditeenuste juhtimise tõhususe ja kvaliteedi parandamist ning
suurendavad piirkondade motivatsiooni korraldada pakkumismenetlusi oma piirkondlike
raudteeteenuste riigihankelepingute sõlmimiseks.
Iga-aastased konkurentsiseadused sisaldavad konkurentsi soodustavaid sektoripõhiseid meetmeid
mitmes valdkonnas, sealhulgas energeetika (elekter, gaas ja vesi), jäätmekäitlus, transport (sadamad,
raudteed ja maanteed) ja tervishoid, mis täiendavad 2., 3. ja 6. missiooni raames tehtavaid
investeeringuid ja reforme. Kõrvalmeetmed, millega tagatakse konkurentsi kasutuselevõtt elektri
jaeturgudel, jõustuvad hiljemalt 31. detsembril 2022. 2022. aasta konkurentsiseadusega võetakse
eelkõige vastu elektrivõrgu arengukava ja edendatakse 2. tootmise arukate elektriarvestite
paigaldamist, mida suurendatakse 31. detsembriks 2025 kogu Itaalias vähemalt 17 miljoni ühiku
võrra. Konkurentsi soodustavad meetmed kehtestatakse ka elektrisõidukite laadimisjaamade suhtes.
Lisaks aitavad seadused kaasa ettevõtluskeskkonna parandamisele vähemalt järgmise kaudu: i)
ühinemiskontrolli eeskirjade vastavusse viimine ELi õigusega, ii) turujärelevalveasutuste
konsolideerimine, digitaliseerimine ja professionaalsemaks muutmine, iii) reform idufirmade ja
riskikapitalitegevuste loomise lihtsustamiseks ja hõlbustamiseks ning tehnosiirde riikliku strateegia
edendamiseks, iv) töötajate teavitamise akrediteerimise aja lühendamine seitsmelt päevalt neljale, et
vähendada ettevõtte asutamiseks kuluvate päevade arvu.
Reform 3: Äriühingute stiimulite lihtsustamise ja ühtlustamise raamistik
Reformi eesmärk on luua raamistik ettevõtetele mõeldud riiklike stiimulite süsteemi läbivaatamiseks,
lihtsustamiseks ja ühtlustamiseks, sillutades sellega teed Itaalia keskpika perioodi eelarve- ja
struktuurikavas võetud kohustusele ratsionaliseerida ja lihtsustada kindlaid stiimuleid. Reform seisneb
õigusaktide jõustumises ning a) RNA (riigiabi riiklik register) ja b) incentivi.gov.it platvormi
98
lisafunktsioonide aktiveerimises. Stiimulite ratsionaliseerimine on järgmine samm, mis ei ole seotud
nõukogu rakendusotsuses sätestatud eesmärkide ja sihtidega.
99
B.2. Tagastamatu rahalise toetuse eesmärgid, sihid, näitajad ning seire ja rakendamise ajakava
Järjekorra-
number
Seotud
meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaariu
m Eesmärk Nõuded Aasta
M1C2–1
Investeering
1: Üleminek
4.0
Eesmärk
Selliste
õigusaktide
jõustumine,
millega tehakse
ülemineku 4.0
maksusoodustuse
d võimalikele
toetusesaajatele
kättesaadavaks,
ja teaduskomitee
loomine
Seaduse säte, mis
osutab maksukrediiti
võimaldava
eelarveseaduse
jõustumisele, ja
sellega seotud
rakendusaktide säte,
mis osutab nende
jõustumisele
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2021
Õigusaktidega tehakse ülemineku
4.0 maksusoodustused võimalikele
toetusesaajatele kättesaadavaks.
Need on maksu ümberarvutused i)
4.0 (st tehnoloogiliselt arenenud)
materiaalsete kapitalikaupade, ii)
4.0 immateriaalsete
kapitalikaupade, iii) standardsete
immateriaalsete kapitalikaupade,
iv) teadus- ja arendustegevuse
ning innovatsiooni ja v)
koolitustegevuse puhul.
Maksukrediidi koodid määratakse
kindlaks maksuameti otsusega, et
võimaldada toetusesaajatel
kasutada F24 maksemudeliga
maksukrediiti. Ministeeriumi
dekreediga luuakse teaduskomitee,
kuhu kuuluvad majandus- ja
rahandusministeeriumi,
majandusarengu ministeeriumi ja
Itaalia Panga eksperdid, et hinnata
ülemineku 4.0 maksukrediidi
majanduslikku mõju.
M1C2–2 Investeering
1: Üleminek Siht Üleminekuperiood
i 4.0 PUUDUVAD Number 0 69 900 2. kv 2024
Ettevõtetele on antud vähemalt
69 900 ülemineku 4.0 maksukrediiti
100
Järjekorra-
number
Seotud
meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaariu
m Eesmärk Nõuded Aasta
4.0 maksusoodustuse
d, mida antakse
ettevõtetele
2021.–2022.
aastal esitatud
maksudeklaratsio
onide alusel
seoses 4.0 materiaalsete
kapitalikaupade, 4.0
immateriaalsete kapitalikaupade,
standardsete immateriaalsete
kapitalikaupade, teadus-, arendus-
ja innovatsioonitegevuse või
koolitustegevusega. Maksu
ümberarvutus loetakse antuks koos
maksudeklaratsiooni esitamisega.
Maksudeklaratsioonid esitatakse
ajavahemikul 1. jaanuarist 2021
kuni 31. detsembrini 2022.
Äriühingute puhul, kelle
maksuaasta ei vasta
kalendriaastale, pikendatakse kõigi
eespool loetletud
maksukrediitidega seotud
maksudeklaratsioonide esitamise
asjaomase perioodi lõppu 31.
detsembrist 2022 kuni 30.
novembrini 2023.
M1C2–3
Investeering
1: Üleminek
4.0
Siht
Üleminekuperiood
i 4.0
maksusoodustuse
d, mida antakse
ettevõtetele
2021.–2023.
aastal esitatud
PUUDUVAD Number 69 900 111 700 2. kv 2025
Ettevõtetele on antud vähemalt
111 700 ülemineku 4.0
maksukrediiti seoses 4.0
materiaalsete kapitalikaupade, 4.0
immateriaalsete kapitalikaupade,
standardsete immateriaalsete
kapitalikaupade, teadus-, arendus-
ja innovatsioonitegevuse või
101
Järjekorra-
number
Seotud
meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaariu
m Eesmärk Nõuded Aasta
maksudeklaratsio
onide alusel
koolitustegevusega. Maksu
ümberarvutus loetakse antuks koos
maksudeklaratsiooni esitamisega.
Maksudeklaratsioonid esitatakse
ajavahemikul 1. jaanuarist 2021
kuni 31. detsembrini 2023.
Äriühingute puhul, kelle
maksuaasta ei vasta
kalendriaastale, pikendatakse kõigi
eespool loetletud
maksukrediitidega seotud
maksudeklaratsioonide esitamise
asjaomase perioodi lõppu 31.
detsembrist 2023 kuni 30.
novembrini 2024.
Lähtestsenaarium viitab
ettevõtetele antud ülemineku 4.0
maksukrediitide arvule, mis
põhineb 1. jaanuarist 2021 kuni 31.
detsembrini 2022 esitatud
maksudeklaratsioonidel 4.0
materiaalse kapitalikauba, 4.0
immateriaalse kapitalikauba ja
standardse immateriaalse vara
kohta ning 1. jaanuarist kuni 31.
detsembrini 2022 esitatud
maksudeklaratsioonidel teadus-,
arendus- ja innovatsioonitegevuse
ning koolitustegevuse kohta.
102
Järjekorra-
number
Seotud
meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaariu
m Eesmärk Nõuded Aasta
Äriühingute puhul, kelle
maksuaasta ei vasta
kalendriaastale, võetakse kõigi
eespool loetletud maksukrediitide
lähtetaseme arvutamisel arvesse
ka kuni 30. novembrini 2023
esitatud maksudeklaratsioone.
Sihtettevõtjana ei käsitata
äriühinguid, kes tegutsevad ATECO
koodide 05, 06, 07 ja 09 alla
kuuluvates tegevusvaldkondades.
Lisaks, mis puudutab
investeeringuid 4.0
materiaalsetesse
kapitalikaupadesse ning arendus-
ja innovatsioonitegevusse, siis
ATECO koodidega 30 kindlaks
määratud tegevusvaldkondades ei
tegutse ühtegi äriühingut. Eesmärgi
puhul võetakse arvesse 22, 29, 38,
41, 42, 43, 17, 01, 50, 19, 20, 51,
24, 49, 23 ja 35.
M1C2–4
Reform 1:
Tööstusoman
di süsteemi
reform
Eesmärk
Seadusandliku
dekreedi
jõustumine, mille
eesmärk on
reformida Itaalia
tööstusomandi
Seaduse säte, mis
osutab uue
tööstusomandi
seadustiku
jõustumisele, ja
sellega seotud
PUUDUVAD PUUDUVAD PUUDUVAD 3. kv 2023
Uue seadusandliku dekreediga
muudetakse Itaalia tööstusomandi
seadustikku (10. veebruari 2005.
aasta seadusandlik dekreet nr 30)
ja see hõlmab vähemalt järgmisi
valdkondi: i) õigusraamistiku
103
Järjekorra-
number
Seotud
meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaariu
m Eesmärk Nõuded Aasta
seadustikku, ja
asjaomased
rakendusaktid
rakendusaktide säte,
mis osutab nende
jõustumisele
läbivaatamine, et tugevdada
tööstusomandi õiguste kaitset ja
lihtsustada menetlusi, ii)
ettevõtetele ja teadusasutustele
antava toetuse tugevdamine, iii)
oskuste ja pädevuste arendamise
edendamine, iv) teadmussiirde
hõlbustamine, v) uuenduslike
teenuste edendamise
tugevdamine.
M1C2–5
Investeering
6:
Investeeringu
d
tööstusomand
i süsteemi
Siht
Vähemalt 254
tööstusomandi ja
teadusuuringuteg
a seotud projekti
lõplikud tegevus-
/projektiaruanded.
PUUDUVAD Number 0 254 4. kv 2025
Vähemalt 254 projekti kohta on
esitatud toetust saavate üksuste
allkirjastatud lõplikud tegevus-
/projektiaruanded.
M1C2–6
Reform 2: Iga-
aastased
konkurentsise
adused
Eesmärk
2021. aasta
konkurentsiseadu
se jõustumine
Säte, mis viitab 2021.
aasta
konkurentsiseaduse
jõustumisele.
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2022
Iga-aastane konkurentsiseadus
sisaldab vähemalt järgmisi
põhielemente, mille
rakendusmeetmed ja teisesed
õigusaktid (vajaduse korral)
võetakse vastu ja jõustuvad
hiljemalt 31. detsembril 2022.
See hõlmab järgmist: – Konkurentsieeskirjade täitmise
tagamine – Kohalikud avalikud teenused
104
Järjekorra-
number
Seotud
meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaariu
m Eesmärk Nõuded Aasta
– Energia – Transport – Jäätmed – Ettevõtte asutamine – Turujärelevalve
Konkurentsieeskirjade jõustamine:
i. Eemaldada täiendavad takistused
ühinemiskontrollile, viies Itaalia
ühinemiskontrolli eeskirjad veelgi
enam kooskõlla ELi õigusega.
Kohalikud avalikud teenused:
ii. Tugevdada ja laialdasemalt
kasutada konkurentsi põhimõtet
kohalike avalike teenuste
hankelepingute puhul, eelkõige
jäätmete ja kohaliku ühistranspordi
valdkonnas.
iii. Piirata otselepingute sõlmimist,
nõudes kohalikelt ametiasutustelt
avaliku teenindamise lepingute
pakkumismenetlustest
kõrvalekaldumise põhjendamist
(vastavalt riigihankeseadustiku
artiklile 192).
iv. Näha ette avaliku teenindamise
lepingute nõuetekohane
reguleerimine, rakendades
105
Järjekorra-
number
Seotud
meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaariu
m Eesmärk Nõuded Aasta
seaduse 124/2015 artiklit 19 ühtse
tekstina kohalike avalike teenuste
kohta, eelkõige jäätmekäitluses.
v. Eeskirjad ja liitmismehhanismid
stimuleerivad omavalitsuste liite, et
vähendada üksuste ja avaliku
sektori hankijate arvu, sidudes nad
optimaalsete territoriaalsete
ühendustega (ambiti territoriali
ottimali) ning vähemalt 350 000
elanikuga kohalike ja piirkondlike
ühistransporditeenuste (bacini e
livelli adeguati di servizi di trasporto
pubblico locale e regionale)
piirkondade ja piisava tasemega.
Kohalikke avalikke teenuseid
käsitlev õigusakt, millega
rakendatakse seaduse 124/2015
artiklit 19, peab vähemalt:
– määratleda avalikud teenused
ELi õiguse kriteeriumide alusel;
– sätestatakse kohalike avalike
teenuste osutamise, reguleerimise
ja haldamise üldpõhimõtted;
– kehtestada avaliku teenindamise
lepingute kestuse
106
Järjekorra-
number
Seotud
meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaariu
m Eesmärk Nõuded Aasta
proportsionaalsuse üldpõhimõte;
– selgelt eraldada avaliku
teenindamise lepingute
reguleerimise, kontrolli ja
haldamise ülesanded;
– tagada, et kohalikud
ametiasutused põhjendaksid oma
osaluse suurendamist
sisetehingutes osalevates
äriühingutes;
– näha ette avaliku teenindamise
lepingute nõuetekohane
hüvitamine, mis põhineb
sõltumatute reguleerivate asutuste
(nt ARERA energia või ART
transpordi valdkonnas) järelevalve
all tehtaval kuluarvestusel;
– piirata siselepingute keskmist
kestust ning vähendada ja
ühtlustada pakkumismenetluses
olevate lepingute standardpikkust
hankeüksuste vahel, tingimusel et
kestus tagab lepingute
majandusliku ja finantstasakaalu,
tuginedes ka transpordiameti
kehtestatud kriteeriumidele.
Energia:
107
Järjekorra-
number
Seotud
meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaariu
m Eesmärk Nõuded Aasta
vi. Muuta kontsessioonilepingute
pakkumismenetlus hüdroenergia
puhul kohustuslikuks ja määrata
kindlaks hüdroenergia
kontsessioonide õigusraamistik.
vii. Muuta kontsessioonilepingute
pakkumismenetlus gaasi
jaotamiseks kohustuslikuks.
viii. Kehtestada läbipaistvad ja
mittediskrimineerivad nõuded
avalike kohtade eraldamiseks
elektrisõidukite laadimiseks või
laadimispunktide/jaamade käitajate
valimiseks.
ix. Kaotada elektritoite reguleeritud
tariifid elektrisõidukite laadimiseks.
Hüdroenergiakontsessioonide
konkurentsiraamistik peab
vähemalt:
– Nõuda, et olulisi
hüdroelektrijaamu reguleeritaks
kesktasandil üldiste ja ühtsete
kriteeriumidega.
– Nõuda piirkondadelt
kontsessioonilepingute kestuse
aluseks olevate majanduslike
108
Järjekorra-
number
Seotud
meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaariu
m Eesmärk Nõuded Aasta
kriteeriumide määratlemist.
Kaotada järk-järgult lepingute
pikendamise võimalus (nagu Itaalia
konstitutsioonikohus on juba
otsustanud).
– Nõuda piirkondadelt
hankekriteeriumidele juurdepääsu
kriteeriumide ühtlustamist (et luua
prognoositav ettevõtluskeskkond).
Transport:
x. Kehtestada selged,
mittediskrimineerivad ja
läbipaistvad kriteeriumid
sadamakontsessioonide
andmiseks.
xi. Kõrvaldada takistused, mis ei
lase sadamakontsessionääridel
ühendada sadama
kontsessioonitegevust mitmes
suures ja keskmise suurusega
sadamas.
xii. Kõrvaldama tõkked, mis
takistavad kontsessionääridel
osutada mõningaid
sadamateenuseid ise ja kasutada
oma seadmeid, ilma et see piiraks
töötajate ohutust, tingimusel et
109
Järjekorra-
number
Seotud
meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaariu
m Eesmärk Nõuded Aasta
töötajate ohutuse kaitseks vajalikud
asjakohased tingimused on
vajalikud ja proportsionaalsed
sadamaaladel ohutuse tagamise
eesmärgiga.
xiii. Lihtsustada sadamate
loakavade läbivaatamise
menetluste läbivaatamist.
xiv. Rakendada dekreet-seaduse nr
50/2017 artikli 27 koma lõike 2
punkti d, millega nähakse
piirkondadele ette stiimulid
korraldada oma piirkondlike
raudteelepingute sõlmimiseks
hankemenetlus.
Jäätmed:
xv. Lihtsustada
jäätmekäitluskohtadele loa
andmise menetlusi.
Ettevõtte loomine:
xvi. Lühendada töötajate
teavitamise akrediteerimise aega
seitsmelt päevalt neljale päevale, et
vähendada ettevõtte asutamiseks
kuluvate päevade arvu.
Turujärelevalve:
110
Järjekorra-
number
Seotud
meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaariu
m Eesmärk Nõuded Aasta
xvii. Riiklike turujärelevalveasutuste
koondamine mitte rohkem kui
kümnesse Itaalia peamistes
piirkondades asuvasse asutusse,
millest igaüks hõlmab kõiki
tooterühmi ja annab aru määruse
2019/1020 (kaupade pakett)
kohaselt loodud ühtsele
kontaktametnikule.
xviii. Nõuda, et riiklikud
turujärelevalveasutused teeksid
digiteeritud tootekontrolle ja
koguksid andmeid, rakendaksid
tehisintellekti ohtlike ja
ebaseaduslike toodete jälgimiseks
ning teeksid kindlaks suundumused
ja riskid ühtsel turul.
xix. Nõuda riiklikelt
turujärelevalveasutustelt koolitust
ning info- ja teavitussüsteemi
kasutamist üleeuroopaliseks
turujärelevalveks.
xx. Luua uued akrediteeritud
laborid kõigi tooterühmade toodete
katsetamiseks. Need laborid
teevad e-kaubanduse katseid,
füüsilisi laborikatseid ja
ühismeetmeid
111
Järjekorra-
number
Seotud
meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaariu
m Eesmärk Nõuded Aasta
(toll/turujärelevalveasutused; kaks
või enam riiklikku
turujärelevalveasutust, riiklikud ja
ELi turujärelevalveasutused).
M1C2–7
Reform 2: Iga-
aastased
konkurentsise
adused
Eesmärk
Kõigi energiaga
seotud
rakendusmeetmet
e ja teiseste
õigusaktide
jõustumine
(vajaduse korral)
Kõigi energiaga
seotud
rakendusmeetmete ja
teiseste õigusaktide
jõustumine (vajaduse
korral)
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2022
Kõigi energiaga seotud
rakendusmeetmete ja (vajaduse
korral) teiseste õigusaktide
jõustumine, et:
i. Mikroettevõtete ja
kodumajapidamiste reguleeritud
hindade järkjärguline kaotamine
alates 1. jaanuarist 2023.
ii. Võtta vastu kõrvalmeetmed, et
toetada konkurentsi
kasutuselevõttu elektri jaeturgudel.
Kõrvalmeetmetega, millega
tagatakse konkurentsi
kasutuselevõtt elektri jaeturgudel,
nähakse ette vähemalt järgmine:
– Müüa kliendibaas
enampakkumisel, et tagada uutele
turuletulijatele võrdsed võimalused.
– Kehtestada igale tarnijale
maksimaalse turuosa ülemmäär;
– Võimaldada Itaalia tarbijatel
paluda oma energiatarnijal
112
Järjekorra-
number
Seotud
meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaariu
m Eesmärk Nõuded Aasta
avaldada arvetel esitatud andmed
kolmandatest isikutest tarnijatele;
– Suurendada elektriarve
läbipaistvust, andes tarbijatele
juurdepääsu spesi per oneri di
sistema alakomponentidele;
– Kaotada nõue, et tarnijad
koguksid tasusid, mis ei ole seotud
energiasektoriga.
M1C2–8
Reform 2: Iga-
aastased
konkurentsise
adused
Eesmärk
Kõigi
rakendusmeetmet
e (sh vajaduse
korral teiseste
õigusaktide)
jõustumine 2021.
aasta
konkurentsiseadu
sest tulenevate
meetmete
tõhusaks
rakendamiseks ja
kohaldamiseks
Kõigi teiseste
õigusaktide,
sealhulgas kõigi 2021.
aasta
konkurentsiseadusest
tulenevate meetmete
jaoks vajalike
määruste jõustumine
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2022
Kõigi rakendusmeetmete (sh
vajaduse korral teiseste
õigusaktide) jõustumine 2021.
aasta konkurentsiseadusest
tulenevate meetmete tõhusaks
rakendamiseks ja kohaldamiseks.
M1C2–9
Reform 2: Iga-
aastased
konkurentsise
adused
Eesmärk
2022. aasta
konkurentsiseadu
se jõustumine
Säte, mis viitab 2022.
aasta
konkurentsiseaduse
jõustumisele.
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2023
2022. aasta konkurentsiseaduse
jõustumine Iga-aastane konkurentsiseadus
sisaldab vähemalt järgmisi
põhielemente, mille
113
Järjekorra-
number
Seotud
meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaariu
m Eesmärk Nõuded Aasta
rakendusmeetmed ja teisesed
õigusaktid (vajaduse korral)
võetakse vastu ja jõustuvad
hiljemalt 31. detsembril 2023.
See teeb järgmist:
i) kehtestada selge menetlus
järgmise kümnendi elektrivõrgu
arengukava vastuvõtmiseks
eelnevalt kindlaksmääratud
tähtaegade jooksul ja igal juhul
asjaomase ajavahemiku 31.
detsembriks (iga kahe aasta
tagant)(*), mis tagab menetluse
lõpuleviimise ja lihtsustab
heakskiitmisprotsessi.
(*) 2021. aasta elektrivõrgu
arengukava võetakse vastu 31.
detsembriks 2023.
ii) edendada teise põlvkonna
arukate elektriarvestite
kasutuselevõttu;
Monopolidevastane võitlus:
iii) pikendada ajavahemikku, mille
jooksul Itaalia konkurentsiamet
(Autorità Garante della
Concorrenza e del Mercato) hindab
114
Järjekorra-
number
Seotud
meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaariu
m Eesmärk Nõuded Aasta
koondumisi, mis võivad seaduse
287/1990 artikli 6 kohaselt tõhusat
konkurentsi märkimisväärselt
takistada, 45 päevalt 90 päevale.
Jaemüük:
iv) eri omavalitsusüksustes
müügipunkte omavate ettevõtjate
soodusmüügi loamenetluste
lihtsustamine.
Ravimid:
v) tagada galeeniliste ravimite
müügi loanõuete
proportsionaalsus.
M1C2–10
Reform 2: Iga-
aastased
konkurentsise
adused
Eesmärk
Kõigi
rakendusmeetmet
e (sh vajaduse
korral teiseste
õigusaktide)
jõustumine 2022.
aasta
konkurentsiseadu
sest tulenevate
meetmete
tõhusaks
rakendamiseks ja
Kõigi teiseste
õigusaktide,
sealhulgas kõigi 2022.
aasta
konkurentsiseadusest
tulenevate meetmete
jaoks vajalike
määruste jõustumine
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2023
Kõigi teiseste õigusaktide
jõustumine (vajaduse korral),
sealhulgas kõik vajalikud määrused
kõigi 2022. aasta
konkurentsiseadusest tulenevate
eespool nimetatud meetmete
tõhusaks rakendamiseks ja
kohaldamiseks.
115
Järjekorra-
number
Seotud
meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaariu
m Eesmärk Nõuded Aasta
kohaldamiseks
M1C2–11
Reform 2: Iga-
aastased
konkurentsise
adused
Eesmärk
2023. aasta
konkurentsiseadu
se jõustumine
Säte, mis viitab 2023.
aasta
konkurentsiseaduse
jõustumisele.
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2024
2023. aasta konkurentsiseaduse
jõustumine. Iga-aastane
konkurentsiseadus sisaldab
vähemalt järgmisi põhielemente,
mille rakendusmeetmed ja teisesed
õigusaktid (vajaduse korral)
võetakse vastu ja jõustuvad
hiljemalt 31. detsembril 2024.
See peab hõlmama vähemalt
järgmisi meetmeid:
Kiirteed:
i) kontsessioonidele juurdepääsu ja
lepingu lõpetamise kohta
sätestatakse iga-aastases
konkurentsiseaduses vähemalt
järgmine:
– muuta
kontsessioonilepingute
pakkumismenetlus maanteede
puhul kohustuslikuks, ilma et
see piiraks in house teenuste
osutamist ELi õigusega
kehtestatud piirides(*);
– tõhustada
kontsessioonilepingutega
116
Järjekorra-
number
Seotud
meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaariu
m Eesmärk Nõuded Aasta
seotud otsuste tegemise
haldusmenetlusi;
– nõuda kontsessioonilepingu
eseme üksikasjalikku ja
läbipaistvat kirjeldust;
–nõuab, et kontsessiooni
andvad asutused määraksid
maanteelõikude
kontsessioonid, mis antakse
avaliku menetluse teel, võttes
arvesse reguleeriva asutuse
(Autorità di Regolazione dei
Trasporti – ART) koostatud
mastaabitõhususe ja
maanteekontsessionääride
kulude prognoose;
– tugevdada
infrastruktuuriministeeriumi
kontrolli maanteede
infrastruktuuri kulude ja
elluviimise üle;
– takistada
kontsessioonilepingute
automaatset uuendamist,
parandada tehnilisi ja
haldusmenetlusi, mis on
seotud majandus- ja
finantskavade korrapärase
117
Järjekorra-
number
Seotud
meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaariu
m Eesmärk Nõuded Aasta
ajakohastamise ja nende
kavade iga-aastase
rakendamisega, ning keelata
riigihangete seadustiku
artikliga 193 reguleeritud
menetluste kasutamine
aegunud või lõppevate
kiirteede
kontsessioonilepingute
sõlmimise vahendina;
– lihtsustada/selgitada lepingu
lõpetamise ja tühistamise
tingimuste reguleerimist, muu
hulgas selleks, et säilitada
teenuse piisav tase;
– lepingu lõpetamiseks
avalikes huvides nähakse
seadusega ette vähemalt
piisav hüvitis, mis võimaldab
kontsessionääril saada tagasi
investeeringud, mis ei ole
täielikult amortiseerunud.
ii) tasude reguleerimismudeli kohta
sätestatakse iga-aastases
konkurentsiseaduses vähemalt
järgmine:
– tagada ARTi hinnakujunduse
118
Järjekorra-
number
Seotud
meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaariu
m Eesmärk Nõuded Aasta
regulatiivse mudeli õigeaegne
ja täielik rakendamine,
tuginedes hinnalae
metoodikale, võttes arvesse
kontsessionääride
mitmeaastase majandus- ja
finantsplaneerimise perioodilisi
ajakohastusi (mille on heaks
kiitnud pädev reguleeriv
asutus) ning nende kavade
iga-aastast kasutuselevõttu.
iii) kasutajate õigusi käsitlevas iga-
aastases konkurentsiseaduses:
– tagada ARTi õigusraamistiku
täielik ja õigeaegne
rakendamine, mis on seotud
kasutajate õiguste kaitsmise ja
piisava teenusetaseme
pakkumisega.
iv) ehitustööde allhangete puhul
peab iga-aastane
konkurentsiseadus vähemalt:
– Seadusandliku dekreedi nr
36/2023 artikli 186 lõike 2
kohaselt kehtestatakse
maanteede
119
Järjekorra-
number
Seotud
meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaariu
m Eesmärk Nõuded Aasta
kontsessionääridele kohustus
usaldada kolmandatele
isikutele avalike tõendite
esitamise menetluse teel 50–
60 % ehitustööde, teenuste ja
asjade hankelepingute
mahust. Osad arvutatakse
vastavalt
kontsessioonidokumentidele
lisatud majandus- ja
finantskavade summadele.
(*) kui tegemist on asutusesiseste
ülesannetega, peab seadus:
– nõuda asutusesisese
delegeerimise õiguspärasuse
kohustuslikku eelkontrolli ja
keelata pakkumismenetluse
algatamine või asutusesiseste
ülesannete andmine ilma
sellise kontrollita;
– anda transpordi
reguleerimise ametile (ART)
piisavad vahendid ja volitused
eespool nimetatud kontrollide
tegemiseks ning riikliku
korruptsioonivastase ameti
(ANAC) (õiguslik) toetus;
– nõuda, et elektrisõidukite
120
Järjekorra-
number
Seotud
meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaariu
m Eesmärk Nõuded Aasta
laadimispunktide paigaldamine
ning piisavate parkimis- ja
puhkealade rajamine
kaubaveoettevõtjatele toimuks
täielikus kooskõlas ARTiga
välja töötatud
õigusraamistikuga.
Kindlustus:
v) vajalike õigusaktide jõustumine,
et võimaldada autode mustade
kastide andmete ülekantavust
kindlustusandjate vahel;
Ettevõtte loomine:
vi) Uuenduslikke idufirmasid ja
riskikapitali käsitlevate õigusaktide
läbivaatamine ja ajakohastamine
(nt 2012. aasta idufirmade seadus),
et ratsionaliseerida kehtivaid
õigusakte, vaadata läbi idufirmade
määratlus ning edendada era- ja
institutsionaalsete investorite
investeeringuid riskikapitali.
M1C2–12
Reform 2: Iga-
aastased
konkurentsise
adused
Eesmärk
2023. aasta
konkurentsiseadu
ses ja muudes
esmastes
Teiseste õigusaktide,
sealhulgas kõigi 2023.
aasta
konkurentsiseaduses
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2024
Teiseste õigusaktide jõustumine
(vajaduse korral), sealhulgas 2023.
aasta konkurentsiseaduses
sätestatud asjakohaste meetmete
121
Järjekorra-
number
Seotud
meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaariu
m Eesmärk Nõuded Aasta
õigusaktides
sätestatud
meetmete
rakendamiseks ja
kohaldamiseks
vajalike
rakendusmeetmet
e (sealhulgas
vajaduse korral
teiseste
õigusaktide)
jõustumine
ja muudes esmastes
õigusaktides
sätestatud meetmete
rakendamiseks ja
kohaldamiseks
vajalike määruste
jõustumine
rakendamiseks ja kohaldamiseks
vajalikud määrused.
Külma triikimist käsitlevate teiseste
õigusaktide jõustumine ja
maagaasi jaemüüjate nimekirjad:
Külmtriikimine:
Sadamates külmtriikimise teenuste
kasutamist reguleerivate stiimulite
jõustumine.
Maagaasi jaemüüjate loetelu:
Selliste teiseste õigusaktide
jõustumine, millega määratakse
kindlaks seadusandliku dekreedi nr
164/2000 artikliga 17 kehtestatud
maagaasi jaemüüjate nimekirja
kantud ettevõtjate juurdepääsu ja
püsivuse kriteeriumid ja nõuded
ning mille eesmärk on suurendada
läbipaistvust ja toetada tarbijate
valikut konkurentsiturgudel.
M1C2–13
Reform 2: Iga-
aastased
konkurentsise
adused
Eesmärk
2025. aasta
konkurentsiseadu
se jõustumine
Säte, mis viitab 2025.
aasta
konkurentsiseaduse
jõustumisele.
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2025
2025. aasta konkurentsiseaduse
jõustumine.
Esmased ja teisesed õigusaktid
(sealhulgas vajaduse korral
rakendusaktid) kiidetakse heaks ja
122
Järjekorra-
number
Seotud
meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaariu
m Eesmärk Nõuded Aasta
need jõustuvad 2025. aasta
neljandaks kvartaliks.
Iga-aastane konkurentsiseadus:
I – Kohalikud avalikud teenused:
- Kehtestada
parandusmeetmed ja
karistused seadusandliku
dekreedi 201/2022 artiklis 30
nõutud järelevalve
vastuvõtmata jätmise,
avaldamata jätmise või
mittetäielikkuse eest.
- Võtta parandusmeetmeid
kohaliku avaliku teenistuse
mitterahuldava juhtimise*
korral. Sellised meetmed
hõlmavad vähemalt selliste
kavade vastuvõtmist, mille
eesmärk on parandada
kvaliteeti ja kulutõhusust ning
täita kõik lepingulised
eesmärgid. Reformiga
nähakse ette, et avaliku
sektori hankijad nõuavad
parandusmeetmeid
kindlaksmääratud tähtaegade
123
Järjekorra-
number
Seotud
meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaariu
m Eesmärk Nõuded Aasta
jooksul.
- Kehtestada
läbipaistvuskohustused
seoses eespool nimetatud
parandusmeetmete
võtmisega, tagada ja vajaduse
korral tugevdada pädevate
reguleerivate asutuste
järelevalve- ja
jõustamisvolitusi ning nõuda,
et pädev asutus esitaks
parlamendile igal aastal
aruande parandusmeetmete
rakendamise seisu kohta.
* Mitterahuldav juhtimine
määratletakse nii, et see hõlmab
vähemalt olukordi, kus ettevõtja on
kandnud märkimisväärset kahju,
mis võib ohustada tema
majanduslikku ja rahalist
elujõulisust, või kui teenuse
kvaliteet on oluliselt madalam
sektoripõhistest võrdlusalustest või
tulemuslikkus on märkimisväärselt
madalam lepingulistest
eesmärkidest.
124
Järjekorra-
number
Seotud
meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaariu
m Eesmärk Nõuded Aasta
II – Piirkondlik transport:
- Laiendada artikli 14 lõigete
kohaldatavust piirkondlikule
ühistranspordile (sealhulgas
sõltuvatele
teenusepakkujatele vastavalt
määrusele (EÜ) nr
1370/2007). Seadusandliku
dekreedi 201/2022 (muudetud
eespool) artiklid 2 ja 3, 17, 30
ja 31.
- Vaadata läbi iga-aastase
konkurentsiseaduse nr
118/2022 artikkel 9, et
kehtestada taristu- ja
transpordiministeeriumile
nõue avaldada alates 2026.
aastast igal aastal kõigi
lõppevate raudteelepingute
sõlmimise menetluste sobivalt
ajastatud ajakava.
- Nõuda, et ART algataks 2026.
aasta teiseks kvartaliks
avaliku konsultatsiooni, et
võtta vastu suunised
piirkondlike transporditeenuste
125
Järjekorra-
number
Seotud
meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaariu
m Eesmärk Nõuded Aasta
pakkumismenetluste
standardimiseks.
III – Elektrilaadimisjaamade
kohta:
- Tagada, et elektrisõidukite
laadimispunktide
kontsessioonide andmine
edendaks konkurentsi,
soodustades turul tarnijate
paljusust.
IV – Tervishoid:
- Kehtestada lepinguliste
kokkulepete ühised kriteeriumid,
et tagada seadusandliku
dekreedi 502/1992 (mida on
muudetud seadusega 118/2022)
artiklite 8quater ja 8quinquies
tõhus rakendamine seoses
eraettevõtjate akrediteerimisega
riiklikku tervishoiusüsteemi ning
tagada avatud ja läbipaistvaid
valikumenetlusi sätestavate
eeskirjade rakendamine.
V. Tehnoloogiasiire:
- Nõuda, et ettevõtlus- ja
126
Järjekorra-
number
Seotud
meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaariu
m Eesmärk Nõuded Aasta
Itaalias valmistatud toodete
ministeerium ning ülikooli- ja
teadusministeerium võtaksid
2026. aasta teiseks kvartaliks
vastu tehnosiirde ja teadmiste
väärindamise riikliku
strateegia, muutes
olemasolevate ressursside
jaotamise tõhusamaks,
edendades kooskõlastatud
strateegiat tehnosiirde
valdkonnas tegutsevate eri
sihtasutuste ja muude
institutsiooniliste subjektide
vahel. Algatusega toetatakse
ja ratsionaliseeritakse
tehnosiirde büroosid,
edendades ka föderatiivseid
algatusi või muid poliitikaid
tõhususe suurendamiseks.
VI – Reguleeritud kutsealade
kohta:
- Lihtsustada kutseühingute
asutamise ja registreerimise
nõudeid.
127
Järjekorra-
number
Seotud
meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaariu
m Eesmärk Nõuded Aasta
M1C2–13a
Reform 2: Iga-
aastased
konkurentsise
adused
Eesmärk
Piirkondlikku
raudteed ja
tehnosiiret
käsitleva(te)
õigusakti(de)
jõustumine
Säte, mis viitab
piirkondlikku raudteed
ja tehnosiiret
käsitleva(te)
õigusakti(de)
jõustumisele
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2026
Piirkondlikku raudteed ja tehnosiiret
käsitleva(te) õigusakti(de)
jõustumine.
Kõnealused eeskirjad hõlmavad:
- Direktori käskkiri, milles
esitatakse pakkumuste
kalendri esitamise ja
nõutavate sisend-
/menetlusetappide vorm
- ministeeriumidevaheline
dekreet, millega
kiidetakse heaks riiklik
tehnosiirde strateegia.
M1C2–14
Reform 2: Iga-
aastased
konkurentsise
adused
Siht
Paigaldatud on
miljoneid 2G
nutiarvesteid
PUUDUVAD Number 16 33 4. kv 2025
Alates 2021. aasta märtsist
paigaldatakse vähemalt 17 miljonit
2G nutiarvestit.
M1C2–14a
Reform 3:
ettevõtete
stiimulite
ratsionaliseeri
mine ja
lihtsustamine.
Eesmärk Volitusakti
jõustumine
Ettevõtete stiimulite
reformi võimaldava
õigusakti jõustumine
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2025
Jõustub volitusakt (legge delega),
millega volitatakse valitsust
ettevõtete stiimulite süsteemi läbi
vaatama.
M1C2–14b Reform 3:
Raamistik
ettevõtete
Eesmärk Esmaste
õigusaktide
Esmaste õigusaktide
jõustumine ettevõtete
stiimulite
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2026 Jõustuvad esmased õigusaktid,
millega kehtestatakse
õigusraamistik uute stiimulite
128
Järjekorra-
number
Seotud
meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaariu
m Eesmärk Nõuded Aasta
stiimulite
lihtsustamisek
s ja
ühtlustamisek
s.
jõustumine reformimiseks kavandamiseks ja kujundamiseks
ning olemasolevate stiimulite
hindamiseks.
129
B.3. Laenuga seotud reformide ja investeeringute kirjeldus
Investeering 2: Mikroelektroonika innovatsioon ja tehnoloogia
Investeeringu eesmärk on toetada mikroelektroonika strateegilise väärtusahela arendamist, investeerides
ränikarbiidi substraatidesse. Investeering seisneb kaheksatolliste ränikarbiidi põhimike teoreetilise
tootmisvõimsuse paigaldamises.
Investeering 3: Kiire internetiühendus (ülilairibaühendus ja 5G)
Investeeringu eesmärk on viia lõpule riikliku ülikiire ja 5G telekommunikatsioonivõrgu väljaehitamine kogu
riigi territooriumil, aidates kaasa digipöörde eesmärkide saavutamisele ja digilõhe vähendamisele Itaalias.
Investeering hõlmab viit kiiremat ühendusprojekti:
1. „Italia a 1 Giga“, mis võimaldab alla laadida vähemalt 1 gigabiti sekundis ja üles laadida 200 Mbit/s
ühenduvust järgmise põlvkonna juurdepääsuvõrgu turutõrgete piirkondades, nagu tehti kindlaks
Infrateli 2021. aasta kaardistamise käigus, mida täiendasid 2023. aastal tehtud kohapealse kontrolli
tulemused;
2. „Italia 5G“, mis võimaldab või pakub 5G-ühendusi turutõrgete piirkondades, nagu tehti kindlaks
Infrateli 2021. aasta juunis tehtud kaardistamise käigus;
3. „Ühendatud koolid“, mis pakuvad kooliruumidele 1 gigabiti/s lairibaühendust;
4. „Ühendatud tervishoiuasutused“, mis pakuvad riiklikele tervishoiuasutustele 1 gigabiti/s
lairibaühendust;
5. „Ühendatud väikesaared“, mis pakuvad ülilairibaühendust valitud väikesaartele, millel puuduvad
kiudoptilised ühendused Euroopaga.
Investeering 4: Satelliittehnoloogia ja kosmosemajandus
Investeeringu eesmärk on arendada digi- ja rohepööret silmas pidades satelliitühendusi ning aidata kaasa
kosmosesektori arendamisele. Investeering koosneb neljast projektist:
1. SATCOM,
2. Maa seire (EO),
3. Kosmosetehas,
4. Orbiidil majandus.
Eeldatakse, et investeeringul puuduvad sõjalised või kaitsealased eesmärgid või mõju.
Investeering 5: Tööstuse tarneahela poliitika ja rahvusvahelistumine
Investeeringu eesmärk on tugevdada tööstuse tarneahelaid, eelkõige hõlbustades juurdepääsu rahastamisele,
ning edendada ettevõtete (eelkõige VKEde) konkurentsivõimet, eelkõige toetades nende rahvusvahelistumist
ja tugevdades nende vastupanuvõimet pärast COVID-19 kriisi.
Investeering koosneb kahest sekkumisliinist:
1. SIMESTi hallatava fondi 394/81 refinantseerimine. See hõlmab sellise olemasoleva fondi
refinantseerimist, mida praegu haldab avalik-õiguslik asutus SIMEST ja millega antakse rahalist
toetust ettevõtetele, eelkõige VKEdele, et toetada nende rahvusvahelistumist mitmesuguste
vahendite abil, nagu programmid välisturgudele pääsemiseks ja e-kaubanduse arendamine.
2. Tarneahelate konkurentsivõime ja vastupanuvõime. See hõlmab arengulepingu vahendi kaudu
ettevõtjatele antavat rahalist toetust projektide jaoks, mis on seotud peamiste strateegiliste
väärtusahelatega, nagu tööstusarengu programmid, keskkonnakaitse arenguprogrammid, kestlik
liikuvus ja turismitegevus.
Eespool nimetatud sekkumised viiakse läbi kooskõlas investeerimispoliitikaga, mis on kooskõlas määruse
(EL) 2021/241 eesmärkidega, sealhulgas seoses põhimõtte „ei kahjusta oluliselt“ kohaldamisega, nagu on
täpsustatud põhimõtte „ei kahjusta oluliselt“ tehnilistes suunistes (2021/C58/01).
130
Selleks et tagada meetme vastavus põhimõtte „ei kahjusta oluliselt“ tehnilistele suunistele (2021/C58/01),
tehakse Itaalia ning rahastamisvahendi eest vastutava volitatud üksuse või finantsvahendaja vahelises
õiguslikus kokkuleppes ja rahastamisvahendi edasises investeerimispoliitikas järgmist:
i. nõuet, et InvestEU fondi kestlikkuskontrolli suhtes kohaldataks komisjoni tehnilist suunist; ja
ii. jätta rahastamiskõlblikkuse alt välja järgmised tegevused ja varad: i) fossiilkütustega seotud tegevus
ja varad, sealhulgas allkasutus1; ii) ELi heitkogustega kauplemise süsteemi (HKS) alla kuuluvad
tegevused ja varad, millega saavutatakse prognoositud kasvuhoonegaaside heide, mis ei ole
asjaomastest võrdlusalustest väiksem2; iii) prügilate, jäätmepõletustehaste ja mehaanilis-bioloogilise
töötlemise jaamadega seotud tegevus3 ja varad4; tegevus ja varad, mille puhul jäätmete pikaajaline
kõrvaldamine võib kahjustada keskkonda; ja
iii. nõuda, et volitatud üksus või finantsvahendaja kontrolliks projektide vastavust asjakohastele ELi ja
riiklikele keskkonnaalastele õigusaktidele kõigi tehingute, sealhulgas kestlikkuskontrollist
vabastatud tehingute puhul.
Investeering 7: Riiklik ühendatuse fond
See meede hõlmab avaliku sektori investeeringut toetuskavasse „Riiklik ühenduvusfond“, et stimuleerida
erainvesteeringuid ja parandada juurdepääsu rahastamisele Itaalia ultralairibavõrgu taristu sektoris. Kava
toimib toetuste andmise kaudu otse erasektorile.
Kava haldab rakenduspartnerina Invitalia S.p.A. Kava hõlmab järgmist tooteseeriat:
• Elujõulisuse puudujääkide toetus, mis nõuab erasektori kaasrahastamist vähemalt 30 % ulatuses
projekti üldkuludest.
Kavasse tehtava investeeringu rakendamiseks allkirjastavad Itaalia ja Invitalia S.p.A. rakenduslepingu, mis
sisaldab järgmist:
1. Kava otsustusprotsessi kirjeldus: Kava lõpliku rahastamisotsuse teeb investeerimiskomitee või muu
asjakohane samaväärne juhtorgan ja see kiidetakse heaks valitsusest sõltumatute liikmete
häälteenamusega.
2. Seotud toetuspoliitika põhinõuded,mis hõlmavad järgmist:
a) Antud toetuste ja rahastamiskõlblike lõplike abisaajate kirjeldus.
b) Nõue, et kõik toetatavad investeeringud peavad olema majanduslikult elujõulised;
c) Nõue järgida põhimõtet „ei kahjusta oluliselt“, nagu on sätestatud põhimõtte „ei kahjusta
oluliselt“ tehnilistes suunistes (2021/C58/01): Eelkõige jäetakse toetuspõhimõtetega
rahastamiskõlblikkuse alt välja järgmised tegevused ja varad: i) fossiilkütustega seotud tegevus
1 Välja arvatud käesoleva meetme kohased elektri- ja/või soojusenergia tootmise ning maagaasi ülekande- ja
jaotustaristuga seotud projektid, mis vastavad põhimõtte „Ei kahjusta oluliselt“ tehniliste suuniste (2021/C58/01) III
lisas sätestatud tingimustele. 2 Kui toetatava tegevuse prognoositav kasvuhoonegaaside heide ei ole asjaomasest võrdlusalusest oluliselt madalam,
tuleks esitada selgitus põhjuste kohta, miks see ei ole võimalik. Saastekvootide tasuta eraldamise võrdlusalused
saastekvootidega kauplemise süsteemi kohaldamisalasse kuuluvate tegevuste jaoks on sätestatud komisjoni
rakendusmääruses (EL) 2021/447. 3 Välistamist ei kohaldata meetme tegevuste suhtes, mis toimuvad üksnes ringlussevõetamatute ohtlike jäätmete
töötlemisega tegelevates jaamades, ega olemasolevate jaamade suhtes, kui meetme tegevuste eesmärk on suurendada
energiatõhusust, koguda heitgaase ladustamiseks või kasutamiseks või taaskasutada põletustuhas leiduvaid materjale,
tingimusel et need tegevused ei suurenda jaamade jäätmetöötlusvõimsust ega pikenda nende kasutusiga; tõendid selle
kohta tuleb esitada iga jaama kohta eraldi.
4 Välistamist ei kohaldata meetme tegevuste suhtes, mis toimuvad olemasolevates mehhaanilis-bioloogilise töötlemise
jaamades, kus nende tegevuste eesmärk on suurendada energiatõhusust või moderniseerida eraldatud jäätmete
ringlussevõttu biojäätmete kompostimiseks ja biojäätmete anaeroobseks lagundamiseks, tingimusel et need tegevused ei
suurenda jaamade jäätmetöötlusvõimsust ega pikenda nende kasutusiga; tõendid selle kohta tuleb esitada iga jaama
kohta eraldi.
131
ja varad, sealhulgas allkasutus, ii) ELi heitkogustega kauplemise süsteemi5 (HKS) alla
kuuluvad tegevused ja varad, millega saavutatakse prognoositud kasvuhoonegaaside heide, mis
ei ole asjaomastest võrdlusalustest väiksem,6 iii) prügilate, jäätmepõletustehaste ja mehaanilis-
bioloogilise töötlemise jaamadega seotud tegevus7 ja varad8.
d) Nõue, et kava lõplikud abisaajad ei tohi samade kulude katmiseks saada toetust muudest liidu
vahenditest.
3. Rakenduslepinguga hõlmatud summa, rakenduspartneri tasude struktuur ja nõue kasutada kava
kasutamata tulu, sealhulgas pärast 2026. aastat, samadel poliitilistel eesmärkidel.
4. Seire-, auditi- ja kontrollinõuded, sealhulgas:
1. Rakenduspartneri kasutatud toetustest aruandmise järelevalvesüsteemi kirjeldus.
2. Rakenduspartneri selliste menetluste kirjeldus, millega tagatakse pettuste, korruptsiooni ja
huvide konfliktide ennetamine, avastamine ja kõrvaldamine.
3. Kohustus kontrollida enne tegevuse jaoks toetuse andmist iga tegevuse
rahastamiskõlblikkust kooskõlas rakenduslepingus sätestatud nõuetega.
4. Kohustus teha riskipõhiseid järelauditeid kooskõlas Invitalia S.p.A. auditikavaga. Nende
audititega kontrollitakse i) kontrollisüsteemide tõhusust, sealhulgas pettuste, korruptsiooni ja
huvide konflikti avastamist; ii) põhimõtte „ei kahjusta oluliselt“ järgimine, riigiabi eeskirjad;
ning iii) järgitakse nõuet, et kava lõplikud abisaajad ei tohi olla saanud samade kulude
katmiseks toetust muudest liidu vahenditest. Auditite käigus kontrollitakse ka tehingute
seaduslikkust ning kohaldatava rakendus- ja toetuslepingu tingimuste täitmist.
Investeering 8: InvestEU liikmesriigi osa
See meede hõlmab avaliku sektori investeeringut InvestEU liikmesriigi osasse, et stimuleerida
erainvesteeringuid ja parandada juurdepääsu rahastamisele sektorites, mis võivad hõlmata muu hulgas
tootmist ja ehitust. InvestEU liikmesriigi osasse antavat toetust kasutatakse VKEde, muude ettevõtete ja
Itaalia majanduse konkurentsivõime suurendamiseks üldiselt, toetades näiteks sotsiaalseid ja kestlikke
taristuprojekte ning teadusuuringute, innovatsiooni ja digiülemineku algatusi. Selle finantstoote toimimiseks
antakse näiteks tagatisi, laene ja omakapitali otse või vahendajate kaudu erasektorile ja sarnase tegevusega
tegelevatele avaliku sektori asutustele.
5 Välja arvatud a) varad ja tegevused maagaasi kasutavas elektri- ja/või soojusenergia tootmises ning sellega seotud
ülekande- ja jaotustaristus, mis vastavad põhimõtte „ei kahjusta oluliselt“ tehniliste suuniste (2021/C58/01) III lisas
sätestatud tingimustele, ning b) alapunktis ii osutatud tegevused ja varad, mille puhul fossiilkütuste kasutamine on
fossiilkütustevabale käitamisele õigeaegseks üleminekuks ajutine ja tehniliselt vältimatu. 6 Kui toetatava tegevusega saavutatakse prognoositud kasvuhoonegaaside heide, mis ei ole asjaomastest võrdlusalustest
oluliselt väiksem, esitatakse selgitus selle kohta, miks see ei ole võimalik. Saastekvootide tasuta eraldamise
võrdlusalused saastekvootidega kauplemise süsteemi kohaldamisalasse kuuluvate tegevuste jaoks on sätestatud
komisjoni rakendusmääruses (EL) 2021/447. 7 Välistamist ei kohaldata meetme tegevuste suhtes, mis toimuvad üksnes ringlussevõetamatute ohtlike jäätmete
töötlemisega tegelevates jaamades, ega olemasolevate jaamade suhtes, kui meetme tegevuste eesmärk on suurendada
energiatõhusust, koguda heitgaase ladustamiseks või kasutamiseks või taaskasutada põletustuhas leiduvaid materjale,
tingimusel et need tegevused ei suurenda jaamade jäätmetöötlusvõimsust ega pikenda nende kasutusiga; tõendid selle
kohta tuleb esitada iga jaama kohta eraldi. 8 Välistamist ei kohaldata meetme tegevuste suhtes, mis toimuvad olemasolevates mehhaanilis-bioloogilise töötlemise
jaamades, kus nende tegevuste eesmärk on suurendada energiatõhusust või moderniseerida eraldatud jäätmete
ringlussevõttu biojäätmete kompostimiseks ja biojäätmete anaeroobseks lagundamiseks, tingimusel et need tegevused ei
suurenda jaamade jäätmetöötlusvõimsust ega pikenda nende kasutusiga; tõendid selle kohta tuleb esitada iga jaama
kohta eraldi.
132
Jõustub tagatisleping komisjoni ja ühe (või mitme) rakenduspartneri vahel, kes on valitud vastavalt Euroopa
Parlamendi ja nõukogu 24. märtsi 2021. aasta määruse (EL) 2021/523 (millega luuakse programm
„InvestEU“ ja millega muudetakse määrust (EL) 2015/1017) asjakohastele sätetele.
Itaalia allkirjastab Euroopa Komisjoniga rahalist toetust käsitleva lepingu, mis hõlmab järgmist:
- Kavandatav(ad) rakenduspartner(id).
- Põhimõtte „ei kahjusta oluliselt“ tehniliste suuniste järgimise nõue (2023/C111). Vajaduse korral
jäetakse muudetud tagatislepingutega rahastamiskõlblikkuse alt välja järgmised tegevused ja varad:
i) fossiilkütustega seotud tegevus ja varad, sealhulgas allkasutus9; ii) ELi heitkogustega kauplemise
süsteemi (HKS) alla kuuluvad tegevused ja varad, millega saavutatakse prognoositud
kasvuhoonegaaside heide, mis ei ole asjaomastest võrdlusalustest väiksem10; iii) prügilate,
jäätmepõletustehaste ja mehaanilis-bioloogilise töötlemise jaamadega seotud tegevus11 ja varad12.
- Kaasatud vahendite kohta aru andmiseks kasutatava järelevalvesüsteemi kirjeldus.
Investeering 9: Võimendatud meede: Üleminek 4.0
Meetme eesmärk on toetada ettevõtete digipööret, stimuleerides erainvesteeringuid digiteerimist toetavatesse
varadesse ja tegevustesse. Meede koosneb maksukrediidi kavast.
9Välja arvatud a) maagaasi kasutavad elektri- ja/või soojusenergia tootmise projektid ning nendega seotud ülekande- ja
jaotustaristu, mis vastavad põhimõtte „ei kahjusta oluliselt“ tehniliste suuniste (2021/C58/01) III lisas sätestatud
tingimustele, ning b) alapunktis ii osutatud tegevused ja varad, mille puhul fossiilkütuste kasutamine on
fossiilkütustevabale käitamisele õigeaegseks üleminekuks ajutine ja tehniliselt vältimatu. 10 Kui toetatava tegevusega saavutatakse prognoositud kasvuhoonegaaside heide, mis ei ole asjaomastest võrdlusalustest
oluliselt väiksem, esitatakse selgitus selle kohta, miks see ei ole võimalik. Saastekvootide tasuta eraldamise
võrdlusalused saastekvootidega kauplemise süsteemi kohaldamisalasse kuuluvate tegevuste jaoks on sätestatud
komisjoni rakendusmääruses (EL) 2021/447. 11 Seda erandit ei kohaldata meetmete suhtes, mida võetakse tehastes, mis on ette nähtud üksnes ringlussevõetamatute
ohtlike jäätmete töötlemiseks, ja olemasolevates tehastes, kui meetmete eesmärk on suurendada energiatõhusust,
koguda heitgaase ladustamiseks või kasutamiseks või taaskasutada materjale põletustuhast, tingimusel et sellised
meetmed ei suurenda tehaste jäätmetöötlusvõimsust ega pikenda nende kasutusiga; tõendid selle kohta tuleb esitada iga
jaama kohta eraldi. 12 Seda erandit ei kohaldata meetmete suhtes, mida võetakse olemasolevates mehaanilis-bioloogilise töötlemise
jaamades, kui meetmete eesmärk on suurendada energiatõhusust või moderniseerida eraldatud jäätmete ringlussevõtu
toiminguid, et kompostida biojäätmeid ja biojäätmete anaeroobset kääritamist, tingimusel et sellised meetmed ei
suurenda jaamade jäätmetöötlusvõimsust ega pikenda jaamade kasutusiga; tõendid selle kohta tuleb esitada iga jaama
kohta eraldi.
133
B.4. Laenu eesmärgid, sihid, näitajad ning seire ja rakendamise ajakava
Järjekorra-
number
Seotud meede (reform
või investeering) Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
M1C2–15
Investeering 2:
Mikroelektroonika
innovatsioon ja
tehnoloogia
Eesmärk
Ränikarbiidi
substraatide
tootmisvõimsu
s
8-tolliste
ränikarbiidi
põhimike
installeeritud
teoreetiline
tootmisvõimsu
s
PUUDUVAD PUUDUVAD PUUDUV
AD 2. kv 2026
Paigaldatud teoreetiline tootmisvõimsus
vähemalt 1 970 288 tollist ränikarbiidi
substraati aastas.
M1C2–16
Investeering 3: Kiire
internetiühendus
(ülilairibaühendus ja
5G)
Eesmärk
Kõigi
riigihankelepin
gute
sõlmimine
kiiremate
ühendusproje
ktide jaoks
Teade kõigi
riigihankelepin
gute
sõlmimise
kohta
kiiremate
ühendusproje
ktide jaoks
PUUDUVAD PUUDUVAD PUUDUV
AD 2. kv 2022
Teade kõigi kiirema ühenduse projektide
riigihankelepingute sõlmimise kohta, mis
hõlmab i) „Italia a 1 Giga“, ii) „Italia 5G“,
iii) „Ühendatud koolid“, iv) „Ühendatud
tervishoiuasutused“; ning v) „Ühendatud
väikesaared“.
M1C2–17
Investeering 3: Kiire
internetiühendus
(ülilairibaühendus ja
5G)
Siht
Majanumbrid
on
aktiveeritud
1 Gbit/s
ühendusega
PUUDUVAD Number 0 2 692 905 2. kv 2026
Vähemalt 2 692 905 majanumbrit
järgmise põlvkonna juurdepääsuvõrgu
(NGA) turutõrgete piirkondades (millest
vähemalt 266 782 asuvad hajutatud
elamupiirkondades, nagu on määratletud
ISTATi 2011. aasta rahvaloenduse
kohaselt), mis on varustatud vähemalt
1 Gbit/s ühendusega Fiber-to-the-
home/buildingi (FTTH/B) või paikse
134
Järjekorra-
number
Seotud meede (reform
või investeering) Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
traadita juurdepääsuvõrgu (FWA) kaudu.
M1C2–18
Investeering 3: Kiire
internetiühendus
(ülilairibaühendus ja
5G)
Siht
1 Gbit/s
ühendusega
kooliruumid ja
tervishoiuasut
used
PUUDUVAD Number 0 17 700 2. kv 2026
Pakutakse vähemalt 17 700 kiiret
lairibaühendust (st ühenduvust vähemalt
1 Gbit/s), millest vähemalt 9 000 on
seotud kooliruumidega ja vähemalt 8 700
riiklike tervishoiuasutustega.
M1C2–19
Investeering 3: Kiire
internetiühendus
(ülilairibaühendus ja
5G)
Siht
Ülilairibaühen
dusega
saared
PUUDUVAD Number 0 18 4. kv 2024
Vähemalt veel 18 saart, millel puuduvad
kiudoptilised ühendused mandriga, on
varustatud ultralairibaühendusega uue
optilise tagasiühenduse kaudu.
M1C2–20
Investeering 3: Kiire
internetiühendus
(ülilairibaühendus ja
5G)
Siht
5G-võrguga
kaetud
linnavälised
teed ja TEN-T
koridorid
PUUDUVAD Number 0 12 600 2. kv 2026
Kokku vähemalt 12 600 km linnaväliseid
teid ja TEN-T koridore, millel on 5G
leviala.
M1C2–21
Investeering 3: Kiire
internetiühendus
(ülilairibaühendus ja
5G)
Siht
Turutõrgete
piirkonnad,
kus 5G leviala
on
aktiveeritud
või tagatud
PUUDUVAD Number 0 1 400 2. kv 2026
Vähemalt 1 400 ruutkilomeetrit
turutõrgetest kaetud 5G-võrguga, millest
vähemalt 500 ruutkilomeetrit on kaetud
5G-võrguga.
M1C2–22 Investeering 4:
Satelliittehnoloogia ja Eesmärk Kõigi
riigihankelepin
Teade kõigi
satelliittehnolo PUUDUVAD PUUDUVAD
PUUDUV
AD 1. kv 2023 Teade kõigi riigihankelepingute
sõlmimise kohta satelliittehnoloogia ja
135
Järjekorra-
number
Seotud meede (reform
või investeering) Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
kosmosemajandus gute
sõlmimine
satelliittehnolo
ogia ja
kosmoseproje
ktide jaoks
ogia ja
kosmoseproje
ktide
riigihankelepin
gute
sõlmimise
kohta
kosmoseprojektide puhul, mis hõlmavad
i) satelliitsidet, ii) Maa seiret, iii)
kosmosetehast ja iv) orbiidil toimuvat
majandust.
M1C2–23 bis
Investeering 4:
Satelliittehnoloogia ja
kosmosemajandus
Eesmärk
Satelliittehnol
oogia ja
kosmoseproje
ktid
Satelliittehnol
oogia ja
kosmoseproje
ktide
lõpparuanded
ning
rakendusasut
ustele
väljastatud
maksekorrald
used
PUUDUVAD PUUDUVAD PUUDUV
AD 2. kv 2026
Rakendusasutustele (Itaalia
Kosmoseagentuur ja Euroopa
Kosmoseagentuur) väljastatakse
maksekorraldusi kogusummas vähemalt
1 340 000 000 eurot.
Rakendusasutuste lõpparuanded
esitatakse järgmiste tegevuste kohta:
1. SATCOM: selliste kahesuguse
kasutusega tehnoloogiate ja
süsteemide loomine, mida
kasutatakse valitsuse jaoks
üliturvaliste satelliitsideteenuste
osutamiseks.
2. Maa seire, mis koosneb i) eelneva
etapi tegevustest: sealhulgas
kaugseire (sünteetiline apertuurradar
(SAR), hüperspektraalne, optiline)
mitme anduriga kogumite
spetsifikatsioon, projekteerimine ja
136
Järjekorra-
number
Seotud meede (reform
või investeering) Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
tootmine ning maismaa, mere ja
atmosfääri seirele keskenduvate
startide hankimine; orbiidil on
vähemalt üks kogum või tõend
kogumite kontseptsiooni kohta; ii)
järgmise etapi tegevus: CyberItaly
projekt, Marketplace ja sellega
seotud teenused.
3. Kosmosetehas, mis koosneb kahest
allprojektist: i) kosmosetehas 4.0:
(väikesatelliitide tootmise,
kokkupaneku, integreerimise ja
katsetamise integreeritud liinid (M-
AIT)); ii) juurdepääs kosmosele:
Teadus- ja arendustegevus ning
prototüüpide loomine, et viia ellu
keskkonnahoidlikke tehnoloogiaid
tulevase põlvkonna tõmbemasinate
ja kanderakettide jaoks.
4. Orbiidil majandus: orbiidil
teenindustehnoloogia
näidisprojektiga seotud tegevus;
riikliku kosmose jälgimise ja seire
(SST) suutlikkuse suurendamine;
kosmoseliikluse korraldamisega
seotud tegevust toetavate
andmeteenuste omandamiseks,
haldamiseks ja osutamiseks vajalike
137
Järjekorra-
number
Seotud meede (reform
või investeering) Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
varade projekteerimine ja tootmine.
M1C2–26
Investeering 5.1:
SIMESTi hallatava fondi
394/81
refinantseerimine ja
ümberkorraldamine
Eesmärk
Fondi 394/81
refinantseerim
ise jõustumine
ja
investeerimisp
oliitika
vastuvõtmine
Seaduse säte,
mis viitab
fondi 394/81
toetus- ja
laenukompon
endi
refinantseerim
ist
käsitleva(te)
dekreet-
seaduse(te)
jõustumisele
Juhatuse
otsuse
heakskiitmine,
millega
kehtestatakse
rahastatavate
projektide
valikukriteeriu
mid
PUUDUVAD PUUDUVAD PUUDUV
AD 3. kv 2021
Dekreetseadus(t)ega nähakse ette fondi
394/81 toetus- ja laenukomponendi
refinantseerimine. Fondi nõukogu kiidab
heaks investeerimispoliitika kehtestamise
otsuse.
Fondi 394/81 refinantseerimisega seotud
investeerimispoliitikas määratletakse
vähemalt järgmine: i) toetatavate
projektide laad ja ulatus, mis on
kooskõlas määruse (EL) 2021/241
eesmärkidega; tingimused sisaldavad
rahastamiskõlblikkuse kriteeriume, et
tagada käesoleva meetme alusel
toetatavate projektide vastavus
põhimõtte „ei kahjusta oluliselt“
tehnilistele suunistele (2021/C58/01),
kasutades kestlikkuskontrolli,
välistamisnimekirja ning nõuet järgida
asjakohaseid ELi ja riiklikke
keskkonnaalaseid õigusakte, ii)
toetatavate tegevuste liiki, iii) sihtrühma
kuuluvaid toetusesaajaid, kellest enamik
on VKEd, ja nende
rahastamiskõlblikkuse kriteeriume, iv)
sätteid võimalike tagasisaadavate
vahendite reinvesteerimiseks sarnaste
138
Järjekorra-
number
Seotud meede (reform
või investeering) Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
poliitikaeesmärkide saavutamiseks ka
pärast 2026. aastat, juhul kui neid ei
kasutata uuesti määruse (EL) 2021/241
alusel antud laenudest tulenevate
intressimäärade tagasimaksmiseks.
Volitatud üksuse või finantsvahendajaga
sõlmitavas lepingus nõutakse põhimõtte
„ei kahjusta oluliselt“ tehniliste suuniste
kasutamist (2021/C58/01).
M1C2–27
Investeering 5.1:
SIMESTi hallatava fondi
394/81
refinantseerimine ja
ümberkorraldamine
Siht
Fondist
394/81 toetust
saanud VKEd
PUUDUVAD Number 0 4 000 4. kv 2021
Alates 1. jaanuarist 2021 sai fondist
394/81 toetust veel vähemalt 4 000
VKEd.
M1C2–28
Investeering 5.2:
Tarneahelate
konkurentsivõime ja
vastupanuvõime
Eesmärk
Arendusleping
ute
investeerimisp
oliitikat
sisaldava
dekreedi
jõustumine
Seaduse säte,
mis viitab
dekreedi
jõustumisele
PUUDUVAD PUUDUVAD PUUDUV
AD 1. kv 2022
Arengulepingute investeerimispoliitikas
määratakse kindlaks vähemalt järgmine:
i) toetatavate projektide laad ja ulatus,
mis on kooskõlas määruse (EL)
2021/241 eesmärkidega; tingimused
sisaldavad rahastamiskõlblikkuse
kriteeriume, et tagada käesoleva meetme
alusel toetatavate projektide vastavus
põhimõtte „ei kahjusta oluliselt“
tehnilistele suunistele (2021/C58/01),
kasutades kestlikkuskontrolli,
välistamisnimekirja ning nõuet järgida
139
Järjekorra-
number
Seotud meede (reform
või investeering) Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
asjakohaseid ELi ja riiklikke
keskkonnaalaseid õigusakte, ii)
toetatavate tegevuste liiki, iii) sihtrühma
kuuluvaid toetusesaajaid ja nende
rahastamiskõlblikkuse kriteeriume, iv)
sätteid võimalike tagasisaadavate
vahendite reinvesteerimiseks sarnaste
poliitikaeesmärkide saavutamiseks ka
pärast 2026. aastat, juhul kui neid ei
kasutata uuesti määruse (EL) 2021/241
alusel antud laenudest tulenevate
intressimäärade tagasimaksmiseks.
Volitatud üksuse või finantsvahendajaga
sõlmitavas lepingus nõutakse põhimõtte
„ei kahjusta oluliselt“ tehniliste suuniste
kasutamist (2021/C58/01).
M1C2–29
Investeering 5.2:
Tarneahelate
konkurentsivõime ja
vastupanuvõime
Siht
Arendusleping
ud heaks
kiidetud
PUUDUVAD Number 0 40 4. kv 2023
Vähemalt 40 heakskiidetud
arenduslepingut kooskõlas nende
investeerimispoliitikaga. Eesmärgi
rahuldav täitmine sõltub ka vähemalt
1 500 miljoni euro suuruste
investeeringute käivitamisest.
M1C2–30 Investeering 7: Riiklik
ühendatuse fond Eesmärk
Rakenduskok
kulepe.
Rakenduskok
kuleppe
jõustumine
PUUDUVAD PUUDUVAD PUUDUV
AD 4. kv 2025
Rakenduskokkuleppe jõustumine.
140
Järjekorra-
number
Seotud meede (reform
või investeering) Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
M1C2–31 Investeering 7: Riiklik
ühendatuse fond Eesmärk
Lõplike
abisaajatega
sõlmitud
õiguslikud
kokkulepped
Allkirjastatud
õiguslikud
kokkulepped
ja üleandmise
tõend
PUUDUVAD PUUDUVAD PUUDUV
AD 2. kv 2026
Invitalia S.p.A. peab olema sõlminud lõplike toetusesaajatega seaduslikud toetuslepingud summas, mis on vajalik, et kasutada 100 % taaste- ja vastupidavusrahastu investeeringust kavasse (võttes arvesse haldustasusid).
Itaalia kannab rahastu jaoks üle
733 402 818 eurot äriühingule Invitalia
S.p.A.
M1C2–32
Investeering 8:
InvestEU liikmesriigi
osa
Eesmärk
Itaalia
valitsuse ja
Euroopa
Komisjoni
vahelise
toetuslepingu
allkirjastamine
Toetuslepingu
allkirjastamine PUUDUVAD PUUDUVAD
PUUDUV
AD 1. kv 2026
Itaalia valitsuse ja Euroopa Komisjoni vahelise toetuslepingu allkirjastamine summas 500 000 000 eurot.
M1C2–33
Investeering 8:
InvestEU liikmesriigi
osa
Siht
InvestEU
investeeringut
e komitee
poolt heaks
kiidetud
rahastamis-
või
investeerimist
oimingud.
PUUDUVAD Protsent 0 100 2. kv 2026
InvestEU investeeringute komitee peab heaks kiitma rahastamis- või investeerimistoimingud, mis moodustavad 100 % rahastamisvahendile eraldatud taaste- ja vastupidavusrahastu vahendite kogusummast.
141
Järjekorra-
number
Seotud meede (reform
või investeering) Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
M1C2–34
Investeering 9:
Võimendatud meede:
Üleminek 4.0
Siht
Üleminekuperi
oodi 4.0
maksusoodust
used, mida
antakse
ettevõtetele
aastatel
2021–2026
esitatud
dokumentide
alusel
PUUDUVAD Number 0 53 110 2. kv 2026
Ettevõtetele on antud vähemalt 53 110
ülemineku 4.0 maksukrediiti seoses 4.0
materiaalsete kapitalikaupade, 4.0
immateriaalsete kapitalikaupade,
standardsete immateriaalsete
kapitalikaupade ning teadus-, arendus- ja
innovatsioonitegevusega. Maksu
ümberarvutus loetakse antuks, kui
Gestore Servizi Energeticile ( edaspidi
„GSE“) esitatakse 2024. ja 2025. aasta
kohta maksudeklaratsioon või täidetud
blanketid. Maksudeklaratsioonid
esitatakse ajavahemikul 1. jaanuarist
2021 kuni 31. detsembrini 2024.
Äriühingute puhul, kelle maksuaasta ei
vasta kalendriaastale, pikendatakse kõigi
eespool loetletud maksukrediitidega
seotud maksudeklaratsioonide esitamise
asjaomase perioodi lõppu 31.
detsembrist 2024 kuni 30. novembrini
2025.
Täitmisvormid esitatakse GSE-le 31.
märtsiks 2026.
Sihtettevõtja ei võta arvesse maksudeklaratsioone ega GSE teavitamist seoses ATECO koodide 05, 06, 07 ja 09 alla kuuluvate tegevusvaldkondadega seotud
142
Järjekorra-
number
Seotud meede (reform
või investeering) Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
krediidiga. Lisaks ei võeta 4.0 materiaalsetesse kapitalikaupadesse ning arendus- ja innovatsioonitegevusse tehtavate investeeringute puhul arvesse maksudeklaratsioone ega GSE teavitamist seoses ATECO koodide 30, 08, 22, 29, 38, 41, 42, 43, 17, 01, 50, 19, 20, 51, 24, 49, 23 ja 35 alla kuuluvate tegevusvaldkondadega seotud krediidiga.
143
C. LÄHETUSE 1 KOMPONENT 3: Turism ja kultuur 4.0.
See Itaalia taaste- ja vastupidavuskava komponent keskendub COVID-19 kriisist rängalt mõjutatud
kahe sektori taaskäivitamisele: kultuur ja turism. Kultuurisektoriga seotud meetmete eesmärk on
muuta kultuuriobjektid juurdepääsetavamaks nii digitaalselt kui ka füüsiliselt, energiatõhusamaks ja
loodusõnnetuste suhtes ohutumaks, toetada kultuuri- ja loomesektori taastumist, sealhulgas toetades
väikeste kultuuriobjektide ja maapiirkondade arhitektuuri atraktiivsust, et suurendada ka territoriaalset
ühtekuuluvust. Ette on nähtud kolm meetmete kogumit: i) sekkumised järgmise põlvkonna
kultuuripärandi arendamiseks, sealhulgas investeeringud digiüleminekusse ja kultuuriobjektide
energiatõhususe parandamisse, ii) väikeste ajalooliste paikade, usu- ja maapiirkondade pärandi
kultuuripõhine taaselustamine; iii) kultuuri- ja loomemajanduse sekkumised 4.0. Turismiga seotud
meetmete eesmärk on suurendada sektori konkurentsivõimet, sealhulgas vähendades sektori
killustatust ja suurendades mastaabisäästu, parandades ja ajakohastades majutus- ja toitlustussektori
standardeid, soodustades digitaalset innovatsiooni ja uute tehnoloogiate kasutamist ettevõtjate poolt,
ning toetada sektori rohepööret. Sellega seoses on kavandatud meetmed turismisektoris tegutsevate
ettevõtete, sealhulgas VKEde ja turismiettevõtjate toetamiseks, sealhulgas digivahenditesse
investeerimise kaudu.
Selle komponendi raames tehtavad investeeringud ja reformid aitavad täita Itaaliale esitatud
riigipõhiseid soovitusi, eelkõige seoses vajadusega „edendada erainvesteeringuid, et edendada
majanduse taastumist ning suunata investeeringud rohe- ja digipöördesse“ (riigipõhine soovitus 3,
2020). Samuti toetavad need sotsiaalset ja territoriaalset ühtekuuluvust ning Itaalia majanduse
konkurentsivõimet, edendades samal ajal turismisektori digitaliseerimist ja kestlikkust.
C.1. Tagastamatu rahalise toetusega seotud reformide ja investeeringute kirjeldus
Investeering 1.1 – Kultuuripärandi digistrateegia ja -platvormid
Meetme eesmärk on digiteerida Itaalia kultuuripärand ning tagada juurdepääs kultuuriressurssidele ja
digiteenustele. Meede hõlmab digitaristu loomist digiressursside kogumiseks, integreerimiseks ja
säilitamiseks, tehes need sihtotstarbeliste platvormide kaudu avalikuks kasutamiseks kättesaadavaks.
Investeering 1.2: Füüsiliste ja kognitiivsete tõkete kõrvaldamine muuseumides, raamatukogudes
ja arhiivides, et võimaldada laiemat juurdepääsu kultuurile ja selles osalemist
Meetme eesmärk on võimaldada füüsilist ja kognitiivset juurdepääsu mitmele Itaalia
kultuuriasutusele. Meede seisneb arhitektuuriliste ja kognitiivsete tõkete kõrvaldamises Itaalia
kultuuriasutustes.
Investeering 1.3: Parandada energiatõhusust kinodes, teatrites ja muuseumides
Meetme eesmärk on suurendada kultuuri- ja loomeruumide, näiteks avalike ja eramuuseumide, kinode
ja teatrite energiatõhusust. Meede hõlmab energiatõhususe meetmeid kultuuri- ja loomeruumides.
Reform 3.1: Kultuuriürituste minimaalsete keskkonnakriteeriumide vastuvõtmine
Reformi eesmärk on parandada kultuuriürituste (nt näitused, festivalid, kultuuriüritused ja
muusikaüritused) ökoloogilist jalajälge, lisades sotsiaalsed ja keskkonnakriteeriumid avaliku sektori
asutuse rahastatavate, edendatavate või korraldatavate kultuuriürituste riigihangetesse.
Investeering 3.3: Kultuurivaldkonnas tegutsejate suutlikkuse suurendamine digi- ja rohepöörde
juhtimiseks
Investeeringu üldeesmärk on toetada kultuuri- ja loomesektori taastumist. See koosneb kahest
sekkumisest.
144
Esimese sekkumise (kultuuritegevuse taastumise toetamine, soodustades innovatsiooni ja
digitehnoloogia kasutamist kogu väärtusahelas) eesmärk on toetada kultuuri- ja loomemajanduses
tegutsejaid digistrateegiate rakendamisel ja nende juhtimissuutlikkuse suurendamisel.
Teise sekkumise (keskkonnahoidliku lähenemisviisi edendamine kogu kultuuri- ja loomeahelas)
eesmärk on soodustada keskkonnakestlikku lähenemisviisi kogu ahelas, vähendades ökoloogilist
jalajälge, edendades uuenduslikku ja kaasavat ökodisaini, sealhulgas ringmajanduse kontekstis, et
suunata üldsust vastutustundlikuma keskkonnakäitumise poole.
Tagamaks, et meede vastab „ei kahjusta oluliselt“ tehnilistele suunistele (2021/C58/01), jäetakse
tulevaste projektikonkursside juhendites sisalduvatest rahastamiskõlblikkuse kriteeriumidest välja
järgmised tegevused: i) fossiilkütustega seotud tegevus, sealhulgas allkasutus13; ii) ELi heitkogustega
kauplemise süsteemi (HKS) raames toimuv tegevus, millega saavutatakse prognoositud
kasvuhoonegaaside heide, mis ei ole asjaomastest võrdlusalustest väiksem14; iii) tegevus, mis on
seotud prügilate, jäätmepõletustehaste15 ja mehaanilis-bioloogilise töötlemise jaamadega16; ning iv)
tegevused, mille puhul pikaajaline jäätmete kõrvaldamine võib keskkonda kahjustada. Peale selle
peab rahastamiskõlblikkuse kriteeriumides olema sätestatud tingimus, et valida võib ainult tegevusi,
mis vastavad asjakohastele ELi ja riiklikele keskkonnaalastele õigusaktidele.
Investeering 4.1: Digitaalse turismi keskus
Meetme eesmärk on võimaldada kogu turismi ökosüsteemil oma pakkumist suurendada, integreerida
ja levitada. Meede seisneb digitaalse turismi keskuse loomises, millele pääseb juurde spetsiaalse
veebiplatvormi kaudu.
Reform 4.1: Giidikutsete tellimise reguleerimine
Investeeringut digitaalse turismi keskusse täiendab reform, mille eesmärk on ühtlustada giidide
eeskirju. Meetmega nähakse kohalikke eeskirju arvesse võttes ette giidide ja nende päritolupiirkonna
kutseorganisatsioon. Reformi süstemaatiline ja ühetaoline kohaldamine võimaldaks reguleerida
kutseala aluspõhimõtteid ja ühtlustada teenuste osutamise taset kogu riigi territooriumil, millel oleks
positiivne mõju turule. Reform hõlmab koolitust ja täiendkoolitust, et pakkumist kõige paremini
toetada.
13 Välja arvatud a) käesoleva meetme kohased maagaasil põhinevad elektri- ja/või soojusenergia tootmise
projektid ning nendega seotud ülekande- ja jaotustaristu, mis vastavad põhimõtte „ei kahjusta oluliselt“
tehniliste suuniste (2021/C58/01) III lisas sätestatud tingimustele, ning b) alapunktis ii osutatud tegevused ja
varad, mille puhul fossiilkütuste kasutamine on fossiilkütustevabale käitamisele õigeaegseks üleminekuks
ajutine ja tehniliselt vältimatu. 14 Kui toetatava tegevuse prognoositav kasvuhoonegaaside heide ei ole asjaomasest võrdlusalusest oluliselt
madalam, tuleks esitada selgitus põhjuste kohta, miks see ei ole võimalik. Saastekvootide tasuta eraldamise
võrdlusalused saastekvootidega kauplemise süsteemi kohaldamisalasse kuuluvate tegevuste jaoks on sätestatud
komisjoni rakendusmääruses (EL) 2021/447. 15 Välistamist ei kohaldata meetme tegevuste suhtes, mis toimuvad üksnes ringlussevõetamatute ohtlike jäätmete
töötlemisega tegelevates jaamades, ega olemasolevate jaamade suhtes, kui meetme tegevuste eesmärk on
suurendada energiatõhusust, koguda heitgaase ladustamiseks või kasutamiseks või taaskasutada põletustuhas
leiduvaid materjale, tingimusel et need tegevused ei suurenda jaamade jäätmetöötlusvõimsust ega pikenda nende
kasutusiga; tõendid selle kohta tuleb esitada iga jaama kohta eraldi. 16 Välistamist ei kohaldata meetme tegevuste suhtes, mis toimuvad olemasolevates mehhaanilis-bioloogilise
töötlemise jaamades, kus nende tegevuste eesmärk on suurendada energiatõhusust või moderniseerida eraldatud
jäätmete ringlussevõttu biojäätmete kompostimiseks ja biojäätmete anaeroobseks lagundamiseks, tingimusel et
need tegevused ei suurenda jaamade jäätmetöötlusvõimsust ega pikenda nende kasutusiga; tõendid selle kohta
tuleb esitada iga jaama kohta eraldi.
145
C.2. Tagastamatu rahalise toetuse eesmärgid, sihid, näitajad ning seire ja rakendamise ajakava
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/
siht Nimetus
Kvalitatiivse
d näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaa
rium Eesmärk Nõuded Aasta
M1C3–2
Investeeringud – 1.1
Kultuuripärandi
digistrateegia ja -
platvormid
Siht
Avaldatud
digitaalmeedia
materjalid
PUUDUVAD Number 0 65 000 000 4. kv 2025 Avaldatakse vähemalt 65 000 000
digitaalmeediaressurssi.
M1C3–3
Investeeringud – 1.2
Füüsiliste ja
kognitiivsete tõkete
kõrvaldamine
muuseumides,
raamatukogudes ja
arhiivides, et
võimaldada laiemat
juurdepääsu
kultuurile ja selles
osalemist
Siht
Sekkumised
muuseumidesse,
mälestistesse,
arheoloogilistesse
piirkondadesse ja
parkidesse,
arhiividesse ja
raamatukogudess
e
PUUDUVAD Number 0 617 2. kv 2026
Tööde ja/või teenuste lõpetamise tõendid
antakse välja kokku vähemalt 617 muuseumile,
mälestisele, arheoloogilisele alale ja pargile,
arhiivile ja raamatukogule.
M1C3–4
Investeeringud – 1.3
Energiatõhususe
parandamine
kinodes, teatrites ja
muuseumides
Siht
Lõpule viidud
sekkumised
riigimuuseumide
ja
kultuuriobjektide,
teatrisaalide ja
kinode osas
(esimene osa)
PUUDUVAD Number 0 80 3. kv 2023
Näitaja viitab lõpuleviidud sekkumiste arvule,
mida tõendab ehitustööde korrapärase
teostamise tõendamine.
Sekkumisliigid, mis tuleb lõpule viia, on
järgmised:
- tehniline ning majanduslik ja
finantsplaneerimine, energiaauditid,
esialgsed keskkonnaanalüüsid,
keskkonnamõju hindamine, leevendused ja
146
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/
siht Nimetus
Kvalitatiivse
d näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaa
rium Eesmärk Nõuded Aasta
hindamised, mille eesmärk on teha
kindlaks kriitilised küsimused, sellest
tulenevad sekkumised energiatõhususe
parandamiseks;
- hoonete välispiiretega seotud sekkumised;
- seadmete, tööriistade, süsteemide, seadmete,
digitaalse rakendustarkvara ning nende
toimimiseks vajalike abiseadmete
väljavahetamine/omandamine, patentide,
litsentside ja oskusteabe omandamine;
- arukate süsteemide paigaldamine
energiatarbimise (arukad hooned) ja
saasteainete heite kaugjuhtimiseks,
reguleerimiseks, juhtimiseks, seireks ja
optimeerimiseks ka tehnoloogiliste
kombinatsioonide kasutamise kaudu.
M1C3–5
Investeeringud – 1.3
Energiatõhususe
parandamine
kinodes, teatrites ja
muuseumides
Siht
Riigimuuseumide
ja
kultuuriobjektide,
teatrisaalide ja
kinodega seotud
sekkumised on
lõpule viidud
(teine osa)
PUUDUVAD Number 80 420 4. kv 2025
Tööde lõpetamise tõendid antakse välja
vähemalt 340 sekkumise kohta, sealhulgas:
1. tehniline ning majanduslik ja
finantsplaneerimine, energiaauditid,
esialgsed keskkonnaanalüüsid,
keskkonnamõju hindamine,
leevendused ja hindamised, mille
eesmärk on teha kindlaks kriitilised
küsimused, sellest tulenevad
147
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/
siht Nimetus
Kvalitatiivse
d näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaa
rium Eesmärk Nõuded Aasta
sekkumised energiatõhususe
parandamiseks;
2. hoonete välispiiretega seotud
sekkumised;
3. seadmete, tööriistade, süsteemide,
seadmete, digitaalse
rakendustarkvara ning nende
toimimiseks vajalike abiseadmete
väljavahetamine/omandamine,
patentide, litsentside ja oskusteabe
omandamine;
4. arukate süsteemide paigaldamine
energiatarbimise (arukad hooned) ja
saasteainete heite kaugjuhtimiseks,
reguleerimiseks, juhtimiseks, seireks
ja optimeerimiseks ka tehnoloogiliste
kombinatsioonide kasutamise kaudu.
M1C3–6
Reform 3.1 –
Kultuurisündmuste
minimaalsed
keskkonnakriteeriu
mid
Eesmärk
Jõustub dekreet,
millega
määratakse
kindlaks
sotsiaalsed ja
keskkonnakriteeri
umid avalikest
vahenditest
rahastatavate
kultuuriüritustega
seotud
Dekreedi
säte, milles
mainitakse
kultuuriüritust
e
minimaalsete
keskkonnakrit
eeriumide
vastuvõtmist
käsitleva
dekreedi
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2022
Vastu võetakse kriteeriumid järgmiste
aspektide kohta: paberi ja trükiste kasutamise
vähendamine, keskkonnasõbralike materjalide
kasutamine, ringlussevõetud ja
korduskasutatud materjalidest ning säästvast
sisustusest tehtud lavakujundus, väikese
keskkonnamõjuga meened, asukoha valimine
bioloogilise mitmekesisuse kaitse alusel,
väikese keskkonnamõjuga toitlustusteenused,
transport üritusele jõudmiseks ja materjalide
transport, energiatarbimine ürituse
148
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/
siht Nimetus
Kvalitatiivse
d näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaa
rium Eesmärk Nõuded Aasta
riigihankemenetlu
stes
jõustumist korraldamiseks.
Juurdepääsetavust ja kaasamist edendavad
sotsiaalsed kriteeriumid hõlmavad järgmist:
puuetega inimeste juurdepääsu edendamine;
noorte, pikaajaliste töötute, ebasoodsas
olukorras olevatesse rühmadesse kuuluvate
inimeste (nt võõrtöötajad ja etnilised
vähemused) ja puuetega inimeste
tööhõivevõimaluste edendamine; tagada
võrdne juurdepääs hangetele ettevõtetele, mille
omanikud või töötajad kuuluvad etnilistesse või
vähemusrühmadesse, nagu ühistud,
sotsiaalsed ettevõtted ja
mittetulundusühendused; inimväärse töö
edendamine, mida mõistetakse õigusena
tootlikule ja vabalt valitud tööle, tööalastele
aluspõhimõtetele ja põhiõigustele, inimväärsele
palgale, sotsiaalkaitsele ja sotsiaaldialoogile.
Reform hõlmab kultuuriüritusi, nagu näitused,
festivalid ja etenduskunstiüritused.
M1C3–7
Investeeringud – 3.3
Kultuurivaldkonnas
tegutsejate
suutlikkuse
suurendamine digi-
ja rohepöörde
Eesmärk
Kõigi selliste
riigihankelepingut
e sõlmimine
rakendusorganisa
tsiooni/toetusesaa
jatega, mis on
seotud
Teade kõigi
riigihankelepi
ngute
sõlmimise
kohta
organisatsioo
nide ja
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2023
Valitud rakendusasutused on spetsialiseerunud
organisatsioonid või võrgustikud, kellel on
oskused ja kogemused nii koolituse kui ka
kultuuriloome, keskkonna, kultuurihalduse ja -
koolituse valdkonnas.
Teade kõigi riigihankelepingute sõlmimise
149
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/
siht Nimetus
Kvalitatiivse
d näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaa
rium Eesmärk Nõuded Aasta
juhtimiseks. kultuurivaldkonna
s tegutsejate digi-
ja rohepöörde
juhtimisega
võrgustikega,
kes
vastutavad
suutlikkuse
suurendamis
e meetmete
elluviimise
eest
kohta projektikonkursside alusel välja valitud
projektide puhul peab olema kooskõlas
põhimõtte „ei kahjusta oluliselt“ tehniliste
suunistega (2021/C58/01), kasutades
välistamisnimekirja ning nõuet järgida
asjakohaseid ELi ja riiklikke keskkonnaalaseid
õigusakte.
M1C3–8 Investeeringud – 4.1
Digiturismi keskus Eesmärk
Lepingute
sõlmimine
digitaalse turismi
portaali
arendamiseks
Teade kõigi
digiturismi
portaali
arendamiseks
sõlmitud
riigihankelepi
ngute
sõlmimise
kohta
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2021
Teade (kõigi) riigihankelepingute sõlmimise
kohta digitaalse turismi portaali arendamiseks.
Digiturismi portaal ajakohastab praegust Italia.it
portaali pilvandmetöötluse ja avatud
arhitektuuri rakendamise kaudu, soodustades
oluliselt ühendamist ökosüsteemiga.
Ajakohastatud portaal sisaldab järgmist: uue
front-end-liidese ja navigeerimispuu loomine;
jaotiste, lehekülgede ja artiklite kujunduse,
struktuuri ja funktsioonide läbivaatamine;
kaartide kasutuselevõtmine; mitmekeelne
haldamine (ülemineku ajal esitletakse portaali
itaalia ja inglise keeles). Teiste, praegu
toetatavate keelte integreerimist oodatakse
kuudel, mis järgnevad vahetult käikulaskmisele.
Lepingute sõlmimine projektikonkursside alusel
välja valitud projektidega kooskõlas põhimõtte
„ei kahjusta oluliselt“ tehniliste suunistega
(2021/C58/01), kasutades välistamisnimekirja
150
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/
siht Nimetus
Kvalitatiivse
d näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaa
rium Eesmärk Nõuded Aasta
ning nõuet järgida asjakohaseid ELi ja riiklikke
keskkonnaalaseid õigusakte.
M1C3–9 Investeering 4.1 –
Digiturismi keskus Siht
Turismiettevõtjate
registreerimine
digitaalse turismi
keskuses
PUUDUVAD Number 0 20 000 2. kv 2024
Sõlmpunktis registreeritud turismiettevõtjate arv
(mis võib muu hulgas hõlmata hotelli,
reisikorraldajat ja ATECO koodidega 55.00.00
määratletud ettevõtjaid; 56.00.00; 79.00.00 ja
muud sektorisse kuuluvad struktuurid) peab
olema vähemalt 20 000.
Vähemalt 7 400 turismiettevõtjat (st 37 %
20 000-st) peavad asuma lõunas.
M1C3–10
Reform 4.1 –
giidikutsete tellimise
reguleerimine.
Eesmärk
Giidide suhtes
kohaldatava
riikliku standardi
määratlemine
Riikliku
miinimumstan
dardi
määratlus ei
tähenda uue
reguleeritud
kutseala
loomist.
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2024
Riikliku miinimumstandardi määratlus ei
tähenda uue reguleeritud kutseala loomist.
Reformiga nähakse ette ka koolitus ja
kutsealane ajakohastamine, et pakkumist
paremini toetada. Reform kvalifitseerub
ainulaadse kutsekvalifikatsiooni omandamise
meetodiks, mis on riigi tasandil vastu võetud
ühtsete standardite alusel riikliku seaduse ja
sellele järgnenud ministrite dekreetidega,
millega rakendatakse riigipiirkondade
vastastikuse mõistmise memorandumit.
M1C3–11
Investeering 1.3 –
Energiatõhususe
parandamine
kinodes, teatrites ja
Eesmärk
Jõustub
kultuuriministeeriu
mi dekreet
vahendite
Kultuuriminist
eeriumi
dekreedi
jõustumise
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2022
Kultuurikohad on kinod, teatrid ja muuseumid.
(INV. 1.3) Muuseumide ja kultuuriasutuste
puhul, mille eesmärk on parandada
energiatõhusust, toimub sekkumine
151
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/
siht Nimetus
Kvalitatiivse
d näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaa
rium Eesmärk Nõuded Aasta
muuseumides eraldamise kohta:
parandada
energiatõhusust
kultuuripaikades
dekreedi säte
vahendite
eraldamise
kohta
energiatõhus
use
parandamise
ks
kultuuripaikad
es
projektiettepanekute tunnustamise kaudu
riiklike kultuuriobjektide ministeeriumis
eesmärgi 1 juhtumi puhul. Vastasel juhul
tehakse eesmärkide 2 ja 3 puhul mitteriiklikud
asutused kindlaks pakkumismenetluse teel.
Lepingute sõlmimine projektikonkursside alusel
välja valitud projektidega peab olema
kooskõlas põhimõtte „ei kahjusta oluliselt“
tehniliste suunistega (2021/C58/01), kasutades
välistamisnimekirja ning nõuet järgida
asjakohaseid ELi ja riiklikke keskkonnaalaseid
õigusakte.
152
C3. Laenuga seotud reformide ja investeeringute kirjeldus
Investeering 4.1: Digitaalse turismi keskus
Meetme eesmärk on võimaldada kogu turismi ökosüsteemil oma pakkumist suurendada, integreerida ja
levitada. Meede seisneb digitaalse turismi keskuse loomises, millele pääseb juurde spetsiaalse
veebiplatvormi kaudu.
Investeering 2.1: Väikeste ajalooliste linnade atraktiivsus
Meetme eesmärk on toetada ebasoodsas olukorras olevate piirkondade majanduslikku ja sotsiaalset arengut,
mis põhineb väikelinnade kultuurilisel taaselustamisel ning kohaliku majanduse ja eelkõige turismi kasvul.
Investeering seisneb kultuuri-, sotsiaal- ja turismitaristu, -teenuste ja -tegevuse toetamises.
Investeering 2.2: Maapiirkondade arhitektuuri ja maastiku kaitse ja parandamine
Meetme eesmärk on parandada maa- ja paikkonna olukorda. Meede seisneb maapiirkondade arhitektuuri ja
maastiku kaitse ja edendamise toetamises.
Investeering 2.3: Ajalooliste parkide ja aedade säilitamise ja renoveerimise programmid
Meetme eesmärk on säilitada ja renoveerida ajaloolisi parke ja aedu, sealhulgas taastada arhitektuuri- või
taimkattekomponendid, tagada ohutus ja juurdepääsetavus, ajakohastada tehnilisi süsteeme ning omandada
uuenduslikke digivahendeid hariduse ja külastajate abistamise jaoks. Meede hõlmab ajalooliste parkide ja
aedade renoveerimist.
Investeering 2.4: Pühakodade seismiline ohutus, FEC pärandi restaureerimine ja kunstiteoste
varjupaigad (taastuskunst)
Meetme eesmärk on vähendada pühakodade maavärinaohtu. Investeering seisneb maavärinate ennetamise
tegevuskava koostamises, pühakodade maavärinakindlaks muutmises, FEC (Fondo Edifici di Culto)
pärandvarade taastamises ja kunstiteostele varjualuste ehitamises.
Investeering 4.2: Turismiettevõtete konkurentsivõime fondid
Meetme eesmärk on toetada turismisektoris tegutsevaid ettevõtteid. See hõlmab maksusoodustust
majutusvõimaluste parandamiseks tehtavate tööde puhul, tagatisfondi, et hõlbustada sektori ettevõtete
juurdepääsu laenudele (VKEde tagatisfondi spetsiaalse osa kaudu), EIP turismi teemafondi aktiveerimist, et
toetada uuenduslikke investeeringuid sektorisse, omakapitalifondi (riiklik turismifond) suure
turismipotentsiaaliga kinnisvara ümberehitamiseks. Täiendav rahastamisvahend (FRI – Fondo Rotativo)
täiendab eespool nimetatud meetmeid turismisektoris tegutsevate ettevõtete toetamiseks. Eespool nimetatud
sekkumised viiakse läbi kooskõlas investeerimispoliitikaga, mis on kooskõlas määruse (EL) 2021/241
eesmärkidega, sealhulgas seoses põhimõtte „ei kahjusta oluliselt“ kohaldamisega, nagu on täpsustatud taaste-
ja vastupidavusrahastu määruse kohastes tehnilistes suunistes põhimõtte „ei kahjusta oluliselt“ kohaldamise
kohta (2021/C58/01).
Selleks et tagada meetme vastavus põhimõtte „ei kahjusta oluliselt“ tehnilistele suunistele (2021/C58/01),
tuleb rahastamisvahendite õiguslikus kokkuleppes ja sellele järgnevas investeerimispoliitikas
i. nõuet, et InvestEU fondi kestlikkuskontrolli suhtes kohaldataks komisjoni tehnilist suunist; ja
ii. jätta välja järgmine tegevuste loetelu: i) fossiilkütustega seotud tegevus, sealhulgas allkasutus17; ii)
ELi heitkogustega kauplemise süsteemi (HKS) raames toimuv tegevus, millega saavutatakse
17 Välja arvatud a) käesoleva meetme kohased maagaasil põhinevad elektri- ja/või soojusenergia tootmise projektid ning
nendega seotud ülekande- ja jaotustaristu, mis vastavad põhimõtte „ei kahjusta oluliselt“ tehniliste suuniste
(2021/C58/01) III lisas sätestatud tingimustele, ning b) alapunktis ii osutatud tegevused ja varad, mille puhul
fossiilkütuste kasutamine on fossiilkütustevabale käitamisele õigeaegseks üleminekuks ajutine ja tehniliselt vältimatu.
153
prognoositud kasvuhoonegaaside heide, mis ei ole asjaomastest võrdlusalustest väiksem18; iii) tegevus,
mis on seotud prügilate, jäätmepõletustehaste19 ja mehaanilis-bioloogilise töötlemise jaamadega20;
ning iv) tegevused, mille puhul jäätmete pikaajaline kõrvaldamine võib kahjustada keskkonda; ja
iii. nõuda, et volitatud üksus või finantsvahendaja kontrolliks projektide vastavust asjakohastele ELi ja
riiklikele keskkonnaalastele õigusaktidele kõigi tehingute, sealhulgas kestlikkuskontrollist vabastatud
tehingute puhul.
Investeering 3.2: Filmitööstuse arendamine (Cinecittà projekt)
Meetme eesmärk on edendada Itaalia filmi- ja audiovisuaalsektorit. Investeering hõlmab stuudiote
renoveerimist ja uute ehitamist, tootmistegevuse parandamist. See võib muu hulgas hõlmata
audiovisuaalpärandi säilitamist ja digiteerimist kinematograafia eksperimentaalkeskuses ning sektori
ametiprofiilide ja oskuste tugevdamist Cinecittà ja kinematograafia eksperimentaalkeskuse koolitustegevuse
kaudu.
Investeering 4.3: Caput Mundi Next Generation EU turismialasteks suurüritusteks.
Meetme eesmärk on parandada turismi suursündmuste kogemust ja turismi kestlikkust mälestiste
renoveerimise, rahvarohkete piirkondadega võrreldes turismi- ja kultuurialternatiivide loomise, kultuuri- ja
turismiteenuste digiteerimise ning rohealade edendamise kaudu. Investeering seisneb programmi „Caput
Mundi“ vastuvõtmises ja rakendamises.
18 Kui toetatava tegevuse prognoositav kasvuhoonegaaside heide ei ole asjaomasest võrdlusalusest oluliselt madalam,
tuleks esitada selgitus põhjuste kohta, miks see ei ole võimalik. Saastekvootide tasuta eraldamise võrdlusalused
saastekvootidega kauplemise süsteemi kohaldamisalasse kuuluvate tegevuste jaoks on sätestatud komisjoni
rakendusmääruses (EL) 2021/447. 19 Välistamist ei kohaldata meetme tegevuste suhtes, mis toimuvad üksnes ringlussevõetamatute ohtlike jäätmete
töötlemisega tegelevates jaamades, ega olemasolevate jaamade suhtes, kui meetme tegevuste eesmärk on suurendada
energiatõhusust, koguda heitgaase ladustamiseks või kasutamiseks või taaskasutada põletustuhas leiduvaid materjale,
tingimusel et need tegevused ei suurenda jaamade jäätmetöötlusvõimsust ega pikenda nende kasutusiga; tõendid selle
kohta tuleb esitada iga jaama kohta eraldi. 20 Välistamist ei kohaldata meetme tegevuste suhtes, mis toimuvad olemasolevates mehhaanilis-bioloogilise töötlemise
jaamades, kus nende tegevuste eesmärk on suurendada energiatõhusust või moderniseerida eraldatud jäätmete
ringlussevõttu biojäätmete kompostimiseks ja biojäätmete anaeroobseks lagundamiseks, tingimusel et need tegevused ei
suurenda jaamade jäätmetöötlusvõimsust ega pikenda nende kasutusiga; tõendid selle kohta tuleb esitada iga jaama
kohta eraldi.
154
C.4. Laenu eesmärgid, sihid, näitajad ning seire ja rakendamise ajakava
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
M1C3–9a Investeering 4.1 –
Digiturismi keskus Siht
Ettevõtete,
sealhulgas
üksikettevõtjate
registreerimine
digitaalse turismi
keskuses ja
teenuste
kättesaadavus
digitaalse turismi
keskuses
PUUDUVAD Number 20 000 35 000 4. kv 2025
Keskuses registreeritakse vähemalt
35 000 ettevõtet, sealhulgas
üksikoperaatorit.
Digitaalse turismi keskuses on
kättesaadavad järgmised teenused:
• Sideteenused ettevõtetele,
sealhulgas
üksikoperaatoritele, et
pakkuda oma pakkumist;
• Andmeanalüüsi vahendid ja
prognoosimudelid, et toetada
andmepõhist otsuste tegemist;
• Täiendus- ja ümberõppe
koolitus;
• VKEdele innovatsiooni
toetamiseks osutatavad
teenused.
M1C3–12
Investeering 2.1 –
Ajaloolise
väikelinna
atraktiivsus
Eesmärk
Kultuuriministeeriu
mi määruse
jõustumine, mis
käsitleb vahendite
eraldamist
omavalitsustele
väikeste
Kultuuriministeeriu
mi määruse
jõustumise
dekreedi säte
vahendite
eraldamise kohta
omavalitsustele
PUUDUVA
D
PUUDUVA
D PUUDUVAD 2. kv 2022
Kultuuriministeeriumi dekreediga
eraldatakse omavalitsustele vahendeid
väikeste ajalooliste linnade atraktiivsuse
suurendamiseks.
Ajaloolise väikelinna atraktiivsuse
suurendamisega seotud
omavalitsusüksused on 250
155
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
ajalooliste linnade
atraktiivsuse
suurendamiseks
väikeste
ajalooliste linnade
atraktiivsuse
suurendamiseks
omavalitsusüksust/küla, mis on
edastanud kultuuriministeeriumile
sekkumisprogrammid.
250 küla valimise kriteeriumid (Inv. 2.1)
jagatakse MiCi, piirkondade, ANCI ja
sisealade vahel, mis; esialgu määravad
nad kindlaks toetuskõlblikud
territooriumid (Inv2.1) eri programmide
vastastikuse täiendavuse tõttu. Seejärel
valitakse külad välja a) territoriaalsete,
majanduslike ja sotsiaalsete
kriteeriumide (statistilised näitajad)
alusel, b) projekti suutlikkuse alusel
mõjutada turismi atraktiivsust ja
suurendada kultuurielus osalemist.
Arvesse on võetud järgmisi statistilisi
näitajaid: demograafiline suurus
(poegadega omavalitsusüksused. Ja
5 000 inimelu) ja suundumused; turistide
vood, muuseumikülastajad;
turismipakkumise järjepidevus (hotellid
ja muud hotellid, B & B-d, toad ja
üürimajutus); omavalitsusüksuse
demograafiline suundumus; elanikkonna
kultuurielus osalemise määr; kultuuri-,
loome- ja turismiettevõtete
(tulunduslikud ja mittetulunduslikud) ning
156
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
nendega seotud töötajate järjepidevus.
Lepingute sõlmimine projektikonkursside
alusel välja valitud projektidega hõlmab
järgmist:
a) rahastamiskõlblikkuse kriteeriumid,
millega tagatakse, et valitud projektid
vastavad põhimõtte „ei kahjusta oluliselt“
tehnilistele suunistele (2021/C58/01),
kasutades välistamisnimekirja ning
nõuet järgida asjakohaseid ELi ja
riiklikke keskkonnaalaseid õigusakte.
b) Kohustus, et investeeringu
kliimapanus vastavalt määruse (EL)
2021/241 VI lisas esitatud metoodikale
moodustab vähemalt 25 % taaste- ja
vastupidavusrahastust toetatavate
investeeringute kogukuludest.
C) kohustus esitada aruanne meetme
rakendamise kohta kava kehtivusaja
keskel ja kava lõppedes.
M1C3–13
Investeering 2.2 –
Maapiirkondade
arhitektuuri ja
maastiku kaitse ja
parandamine
Eesmärk
Kultuuriministeeriu
mi määruse
jõustumine
vahendite
eraldamise kohta
maapiirkondade
Kultuuriministeeriu
mi määruse
jõustumise
dekreedi säte
vahendite
eraldamise kohta
PUUDUVA
D
PUUDUVA
D PUUDUVAD 2. kv 2022
Kultuuriministeeriumi dekreediga
eraldatakse vahendid maapiirkondade
arhitektuuri ja maastiku kaitseks ja
parandamiseks.
Maapiirkondade arhitektuuri ja maastiku
157
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
arhitektuuri ja
maastiku kaitseks
ja parandamiseks
maapiirkondade
arhitektuuri ja
maastiku kaitseks
ja parandamiseks
kaitsmiseks ja parandamiseks (Inv 2.2)
tuleb tagasinõutavate varade valimisel
eelistada investeeringu võimet avaldada
mõju maastikuväärtuste kaitse-
eesmärkidele. Eelistatakse:
– suure maastikuväärtusega
territooriumidel asuvatele varadele
(maastikule huvi pakkuvatel või
märkimisväärset avalikku huvi
pakkuvatel aladel asuvad varad
(dekreetseaduse nr 42/2004 artiklid
142–139), UNESCO tunnustuse all
olevatele maastikele, FAO GIAHSile;
– varade suhtes, mis on juba üldsusele
kättesaadavad või millele juurdepääsu
omanik nõustub, sealhulgas kohalikes ja
integraallülitustes ja -võrkudes;
– „pindalaprojektidele“, mis on esitatud
koondteemade kaupa ja mis suudavad
tõhusamalt tagada maastiku
ümberkujundamise eesmärkide
saavutamise;
– projektid, mis asuvad piirkondades,
mis suurendavad integratsiooni ja
koostoimet teiste broneeringuinfo
määruse kandidaatidega, ning muud
territoriaalse iseloomuga
158
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
kavad/projektid, mida toetatakse
riiklikust programmitööst
(kultuuriministeerium).
Sekkumise esemeks oleva
maaarhitektuuri liikide
kindlaksmääramisel võib lähtuda MiBACi
6. oktoobri 2005. aasta dekreedist (24.
detsembri 2003. aasta seaduse nr 378
„Maaarhitektuuri kaitse ja parandamine“
rakendamiseks). Esialgu võivad
kriteeriumid hõlmata järgmist: varade
säilimise olukord, kasutamise tase,
nende varade roll territoriaalses ja
linnakontekstis.
Lepingute sõlmimine projektikonkursside
alusel välja valitud projektidega peab
olema kooskõlas põhimõtte „ei kahjusta
oluliselt“ tehniliste suunistega
(2021/C58/01), kasutades
välistamisnimekirja ning nõuet järgida
asjakohaseid ELi ja riiklikke
keskkonnaalaseid õigusakte.
M1C3–14
Investeering 2.3 –
Programmid
kohtade, parkide
ja ajalooliste
aedade identiteedi
Eesmärk
Jõustub
kultuuriministeeriu
mi dekreet
vahendite
eraldamise kohta:
Kultuuriministeeriu
mi määruse
jõustumise
dekreedi säte
vahendite
PUUDUVA
D
PUUDUVA
D PUUDUVAD 2. kv 2022
Kultuuriministeeriumi dekreediga
eraldatakse vahendid vastutavatele
haldusasutustele projektide jaoks, mille
eesmärk on tugevdada kohtade, parkide
159
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
edendamiseks projektid, mille
eesmärk on
suurendada
kohtade, parkide
ja ajalooliste
aedade identiteeti
eraldamise kohta
projektidele, mille
eesmärk on
tugevdada
kohtade, parkide
ja ajalooliste
aedade identiteeti
ja ajalooliste aedade identiteeti.
Ajaloolised pargid ja aiad (Inv. 2.3)
sekkumise objektiks on üksnes kaitstud
kultuuriväärtused, mille puhul on
deklareeritud kunstiline või ajalooline
huvi. Need võivad kuuluda nii riigi
kultuuriministeeriumile kui ka riigivara
hulka mittekuuluvale varale. Valik
tehakse kriteeriumide alusel, mille
määrab kindlaks tehnika- ja
teadusvaldkonna koordineerimisrühm,
kuhu kuuluvad MiC, University, ANCI ja
valdkondlike ühenduste esindajad.
Lepingute sõlmimine projektikonkursside
alusel välja valitud projektidega peab
olema kooskõlas põhimõtte „ei kahjusta
oluliselt“ tehniliste suunistega
(2021/C58/01), kasutades
välistamisnimekirja ning nõuet järgida
asjakohaseid ELi ja riiklikke
keskkonnaalaseid õigusakte.
M1C3–15
Investeering 2.4 –
kultuskohtade
seismiline ohutus,
energia
lõpptarbimise
pärandi
Eesmärk
Jõustub
kultuuriministeeriu
mi dekreet
vahendite
eraldamise kohta
seismilise ohutuse
Dekreedi säte, mis
viitab
kultuuriministeeriu
mi dekreedi
jõustumisele, mis
käsitleb vahendite
PUUDUVA
D
PUUDUVA
D PUUDUVAD 2. kv 2022
Kultuuriministeeriumi dekreediga
määratakse kindlaks rakendusüksus
ning sekkumise ja tüpoloogia objektiks
olevate hoonete rahastamiskõlblikkus ja
rahastamine.
160
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
restaureerimine ja
kunstiteoste
varjualused
tagamiseks
pühakodade ja
FEC (Fondo
Edifici di Culto)
pärandi
taastamise
asemel
eraldamist kultuse
ja FEC (Fondo
Edifici di Culto)
pärandi
restaureerimise
asemel seismilise
ohutuse
tagamiseks
(INV 2.4) Jõudluspaikade maavärinate
ennetamise ja ohutuse meetmed
puudutavad piirkondi, mida mõjutasid
mitmed maavärinad, mis tabasid Itaalia
piirkondi alates 2009. aastast (Abruzzo,
Lazio, Marche ja Umbria).
FECi (Fondo Edifici di Culto)
sekkumised valitakse välja FECi (Fondo
Edifici di Culto) pärandi varade
kaitsestaatuse alusel.
Lepingute sõlmimine projektikonkursside
alusel välja valitud projektidega peab
olema kooskõlas põhimõtte „ei kahjusta
oluliselt“ tehniliste suunistega
(2021/C58/01), kasutades
välistamisnimekirja ning nõuet järgida
asjakohaseid ELi ja riiklikke
keskkonnaalaseid õigusakte.
M1C3–16
Investeeringud –
2.1 Väikeste
ajalooliste linnade
atraktiivsus
Eesmärk
Väikestes
ajaloolistes
linnades toetust
saanud ettevõtete
loetlemist
käsitleva(te)
määruse(te)
vastuvõtmine
Dekreedi
(dekreetide)
vastuvõtmine,
milles loetletakse
toetatavad
ettevõtted
PUUDUVA
D
PUUDUVA
D PUUDUVAD 2. kv 2025
Võetakse vastu määrus(ed), milles
loetletakse vähemalt 1 800 ettevõtet,
kes said toetust väikestes ajaloolistes
linnades.
161
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
M1C3–16a
Investeeringud –
2.1 Väikeste
ajalooliste linnade
atraktiivsus
Siht Läbiviidud
sekkumised PUUDUVAD Number 0 3 250 2. kv 2026
Viiakse läbi vähemalt 3 250 sekkumist,
millest 400 real A.
M1C3–17
Investeeringud –
2.2
Maapiirkondade
arhitektuuri ja
maastiku kaitse ja
parandamine
Siht Läbiviidud
sekkumised PUUDUVAD Number 0 3 900 2. kv 2026
Haldustõendid, mis kinnitavad, et
sekkumisi on tehtud vähemalt 3 900
vara suhtes.
M1C3–18
Investeering 2.3 –
Ajalooliste parkide
ja aedade
säilitamise ja
renoveerimise
programmid
Siht
Renoveeritud
ajalooliste parkide
ja aedade arv
PUUDUVAD Number 0 100 4. kv 2025
Väljastatakse tõendid vähemalt 100
ajaloolise pargi ja aia renoveerimise
tööde lõpuleviimise kohta.
M1C3–19
Investeering 2.4 –
Päritolupaikade
turve, Fondo
Edifici di Culto
pärandi ja
kunstiteoste
varjupaikade
restaureerimine
(taastuskunst)
Siht Läbiviidud
sekkumised PUUDUVAD Number 0 700 2. kv 2026
Läbi on viidud vähemalt 700 sekkumist,
millest üks on mõeldud kunstiteostele ja
kaks kunstiteoste ladustamiseks.
M1C3–20 Investeering 3.2: Eesmärk Rakendusüksuse Lepingute PUUDUVA PUUDUVA PUUDUVAD 2. kv 2023 Rakendusüksuse Cinecittà SPA ja
162
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
Filmitööstuse
arendamine
(Cinecittà projekt)
Cinecittà SPA ja
äriühingute
vaheliste lepingute
allkirjastamine
üheksa stuudio
ehitamiseks
allkirjastamine D D äriühingute vahel üheksa stuudio
ehitamiseks sõlmitud lepingute
allkirjastamine.
See sekkumine hõlmab uute stuudiote
ehitamist, olemasolevate stuudiote
taastamist, investeeringuid uude
digitehnoloogiasse, süsteemidesse ja
teenustesse, mille eesmärk on
tugevdada Cinecittà SPA hallatavaid
Cinecittà filmstuudioid.
Rakendusüksuse Cinecittà SPA ja
äriühingute vaheline leping sisaldab
toetatavate varade/tegevuste ja/või
äriühingute DNSH tehnilistele suunistele
(2021/C58/01) vastavuse valiku-
/kõlblikkuskriteeriume.
Kohustus/eesmärk investeerida 20 %
varadesse/tegevustesse ja/või
ettevõtetesse, mis vastavad digitaalse
märgistamise valikukriteeriumidele ja
70 % kliimamuutustega seotud kulutuste
jälgimise valikukriteeriumidele.
M1C3–21
Investeering 3.2:
Filmitööstuse
arendamine
(Cinecittà projekt)
Siht
Stuudiote
ehitamine ja/või
renoveerimine
ning
PUUDUVAD Number 0 9 2. kv 2026
Tööde lõpetamise tõendid ja/või
teenuste osutamise/asjade tarnimise
tõendid vähemalt üheksa stuudio
ehitamiseks ja/või renoveerimiseks.
163
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
eksperimentaalse
kinematograafia
keskuse teenuste
osutamine
Tõendid eksperimentaalse
kinematograafia keskusele tarnitud
kaupade ja/või osutatud teenuste ja/või
tehtud tööde kohta järgmistel ridadel: i) virtuaalse reaalajas komplekti loomine;
ii) kinematograafia e-õppe platvorm; iii)
õppe- ja õpetamistegevuse
digitaliseerimine; iv) digiteerimine ja
audiovisuaalse pärandi säilitamine.
M1C3–22
Investeering 4.2 –
Turismiettevõtete
konkurentsivõime
fondid
Eesmärk
Euroopa
Investeerimispang
a temaatilise fondi
investeerimispoliiti
ka
Investeerimispoliiti
ka vastuvõtmine
PUUDUVA
D
PUUDUVA
D PUUDUVAD 4. kv 2021
Investeerimispoliitikas määratakse
kindlaks vähemalt järgmine: toetatavate
tegevuste laad, ulatus ja tegevused,
sihtrühma kuuluvad toetusesaajad,
finantstoetuse saajate
rahastamiskõlblikkuse kriteeriumid ja
nende valimine avaliku projektikonkursi
kaudu; ning sätted võimalike
tagasisaadavate vahendite
reinvesteerimiseks samade
poliitikaeesmärkide saavutamiseks.
Investeerimispoliitikas nähakse ette, et
50 % fondist eraldatakse
energiatõhususe meetmetele.
Investeerimispoliitika sisaldab
valikukriteeriume, millega tagatakse
käesoleva meetme raames toetatavate
tehingute vastavus põhimõtte „ei
164
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
kahjusta oluliselt“ tehnilistele suunistele
(2021/C58/01), kasutades
kestlikkuskontrolli, välistamisnimekirja
ning nõuet järgida asjakohaseid ELi ja
riiklikke keskkonnaalaseid õigusakte.
M1C3–23
Investeering 4.2:
Turismiettevõtete
konkurentsivõime
fondid
Eesmärk
Riikliku
turismifondi
investeerimispoliiti
ka
Investeerimispoliiti
ka vastuvõtmine
PUUDUVA
D
PUUDUVA
D PUUDUVAD 4. kv 2021
Fond on ette nähtud Itaalia kinnisvara
ostmiseks, ümberkorraldamiseks ja
ümberkvalifitseerimiseks, et toetada
turismi arengut kriisist kõige enam
mõjutatud piirkondades või äärealadel
(rannikualad, väikesaared,
äärepoolseimad piirkonnad ning maa- ja
mägipiirkonnad).
Investeerimispoliitika sisaldab
valikukriteeriume, millega tagatakse
käesoleva meetme raames toetatavate
tehingute vastavus põhimõtte „ei
kahjusta oluliselt“ tehnilistele suunistele
(2021/C58/01), kasutades
kestlikkuskontrolli, välistamisnimekirja
ning nõuet järgida asjakohaseid ELi ja
riiklikke keskkonnaalaseid õigusakte.
M1C3–24
Investeering 4.2 –
Turismiettevõtete
konkurentsivõime
fondid
Eesmärk
Investeerimispoliiti
ka järgmistes
valdkondades:
VKEde
tagatisfond,
Investeerimispoliiti
ka vastuvõtmine
PUUDUVA
D
PUUDUVA
D PUUDUVAD 4. kv 2021
Investeerimispoliitikas nähakse ette, et
50 % fondist eraldatakse
energiatõhususe meetmetele.
Investeerimispoliitika sisaldab
valikukriteeriume, millega tagatakse
165
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
käesoleva meetme raames toetatavate
tehingute vastavus põhimõtte „ei
kahjusta oluliselt“ tehnilistele suunistele
(2021/C58/01), kasutades
kestlikkuskontrolli, välistamisnimekirja
ning nõuet järgida asjakohaseid ELi ja
riiklikke keskkonnaalaseid õigusakte.
M1C3–25
Investeering 4.2:
Turismiettevõtete
konkurentsivõime
fondid
Eesmärk
Fondo Rotativo
investeerimispoliiti
ka
Investeerimispoliiti
ka vastuvõtmine
PUUDUVA
D
PUUDUVA
D PUUDUVAD 4. kv 2021
Investeerimispoliitikas nähakse ette, et
50 % fondist eraldatakse
energiatõhususe meetmetele.
Investeerimispoliitika sisaldab
valikukriteeriume, millega tagatakse
käesoleva meetme raames toetatavate
tehingute vastavus põhimõtte „ei
kahjusta oluliselt“ tehnilistele suunistele
(2021/C58/01), kasutades
kestlikkuskontrolli, välistamisnimekirja
ning nõuet järgida asjakohaseid ELi ja
riiklikke keskkonnaalaseid õigusakte.
M1C3–26
Investeering 4.2:
Turismiettevõtete
konkurentsivõime
fondid
Eesmärk
Majutusasutuste
ümberkorraldamis
e
maksusoodustuse
rakendusmääruse
jõustumine.
Seaduse säte, mis
osutab
maksukrediiti
võimaldava
eelarveseaduse
jõustumisele, ja
sellega seotud
rakendusaktide
PUUDUVA
D
PUUDUVA
D PUUDUVAD 4. kv 2021
Maksusoodustuse andmise aluseks olev
õigusakt on 31. mai 2014. aasta seadus
nr 83, millega kehtestati
maksusoodustuse tunnustamine
majutusettevõtete ümberkorraldamise
sekkumiste puhul.
Toetatavate varade/tegevuste ja
toetusesaajate põhimõtte „ei kahjusta
166
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
säte, mis osutab
nende
jõustumisele
oluliselt“ tehnilistele suunistele
(2021/C58/01) vastavuse valiku-
/rahastamiskõlblikkuse kriteeriumid,
millega nõutakse vähemalt
kõrvalejätmisloetelu kasutamist ning
toetatavate varade/tegevuste ja
toetusesaajate vastavust asjakohasele
ELi ja riiklikule keskkonnaalasele
acquis’le ning vastavuse tagamist.
M1C3–27
Investeering 4.3 –
Caput Mundi-Next
Generation EU
turismialasteks
suurüritusteks
Siht
Nende kultuuri- ja
turismiobjektide
arv, mille
ümberkvalifitseeri
mine jõudis
keskmiselt 50 %ni
Stato
Avanzamento
Lavorist (SAL)
(esimene partii)
PUUDUVAD Number 0 100 4. kv 2024
Eesmärk saavutatakse, kui 100 kultuuri-
ja turismiobjekti keskmine
ümberkvalifitseerimise edenemine
saavutab 50 % Stato Avanzamento
Lavori (SAL) kõrgemale palgaastmele
tõusmise staatusest.
M1C3–28 Investeering 4.2:
Turismiettevõtete
konkurentsivõime
fondid
Siht Dekreet/dekreedid
maksu
ümberarvutuse
ja/või
väljamaksetaotlus
e rahuldamise ja
laekumise kohta
PUUDUVAD Number 0 2 700 4. kv 2025 Dekreet (dekreedid), millega antakse
maksukrediit ja/või
toetus vähemalt 2 700 ettevõtjale, kes
on investeerinud taristusse ja/või
teenustesse, mida tõendavad
väljamaksetaotluse laekumised.
167
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
M1C3–29
Investeering 4.2:
Turismiettevõtete
konkurentsivõime
fondid
Siht
Euroopa
Investeerimispang
a temaatiliste
fondide kaudu
toetatavate
projektide arv
PUUDUVAD Number 0 70 2. kv 2026
Valitud finantsvahendajad peavad olema
sõlminud seaduslikud
rahastamislepingud lõplike abisaajatega,
et toetada EIP temaatiliste fondide
kaudu vähemalt 70 projekti.
M1C3–30
Investeering 4.2:
Turismi
konkurentsivõime
fondid
ettevõtted
Siht
Euroopa
Investeerimispang
a temaatilised
fondid:
Väljamaksed
fondile
kogusummas
350000000 eurot
PUUDUVAD Number 0 350 000 000 4. kv 2022
Väljamaksed peavad olema kooskõlas
vahe-eesmärgis määratletud
investeerimispoliitikaga.
M1C3–31
Investeering 4.2:
Turismiettevõtete
konkurentsivõime
fondid
Siht
Riiklik turismifond:
Kokku
150 000 000 euro
suurune
väljamakse fondi
omakapitalitoetus
eks
PUUDUVAD Number 0 150 000 000 4. kv 2022
Väljamaksed peavad olema kooskõlas
vahe-eesmärgis määratletud
investeerimispoliitikaga.
M1C3–32
Investeering 4.2:
Turismiettevõtete
konkurentsivõime
fondid
Siht
VKEde
tagatisfondist
toetatavate
ettevõtete arv
PUUDUVAD Number 0 1 000 4. kv 2025 Garantii andmise lõplik kiri väljastatakse
vähemalt 1 000 ettevõttele.
168
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
M1C3–33
Investeering 4.2 –
Turismiettevõtete
konkurentsivõime
fondid
Siht
Fondo Rotativo: Lõplike
abisaajatega
sõlmitud
õiguslikud
kokkulepped
PUUDUVAD Number 0 300 4. kv 2025
Sõlmitud on õiguslikud
rahastamislepingud, et toetada Fondo
Rotativo kaudu vähemalt 300 ettevõtet.
M1C3–35
– Investeeringud –
4.3 Caput Mundi-
Next Generation
EU turismialasteks
suurüritusteks
Eesmärk
Iga lepingu
allkirjastamine
kuue projekti
puhul
turismiministeeriu
mi ja
toetusesaajate/rak
endusasutuste
vahel
Turismiministeeriu
mi, Rooma
pealinna
omavalitsuse ja
teiste asjaosaliste
vahelise
programmilepingu
avaldamine
PUUDUVA
D
PUUDUVA
D PUUDUVAD 2. kv 2022
Lepingud allkirjastatakse kuue projekti
kohta: 1) Rooma kultuuripärand ELi järgmise
põlvkonna jaoks; 2) Pagan-Roomast
kristliku Roomani – Jubilee teed; 3)
#Lacittàcondivisa; 4) #Mitingodiverde; 5)
roma 4,0; 6) #Amanotesa
Toetusesaajate/rakendusasutuste
loetelu sisaldab järgmist: Rooma
pealinn; Rooma kultuuri-, keskkonna- ja
maastikupärandi arheoloogiline
järelevalve (MIC); Colosseumi
arheoloogiapark; Appia Antica
arheoloogiapark; Rooma piiskopkond;
Turismiministeerium Lazio maakond.
Enne pakkumiskutset määratakse
kindlaks valiku- ja lepingu sõlmimise
kriteeriumid ning projektide eripärad
koos asjaomaste ressurssidega.
Lepingute sõlmimine projektikonkursside
alusel välja valitud projektidega peab
169
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
olema kooskõlas põhimõtte „ei kahjusta
oluliselt“ tehniliste suunistega
(2021/C58/01), kasutades
välistamisnimekirja ning nõuet järgida
asjakohaseid ELi ja riiklikke
keskkonnaalaseid õigusakte.
M1C3–36
Investeeringud –
4.3 Caput Mundi-
Next Generation
EU turismialasteks
suurüritusteks
Siht
Ehitustööde või
teenuste
lõpetamise
tõendid
PUUDUVAD Number 0 200 2. kv 2026
Tööde või teenuste lõpetamise tõendid
antakse välja vähemalt 200 Caput Mundi
programmis loetletud sekkumise kohta.
170
D. LÄHETUSE 2 KOMPONENT 1: Ringmajandus, põllumajanduslik toidutööstus ja
rohepööre
See Itaalia taaste- ja vastupidavuskava komponent hõlmab investeeringuid ja reforme jäätmekäitluse,
ringmajanduse, põllumajandusliku toidutööstuse väärtusahelate toetamise ja rohepöörde valdkonnas.
Neid reforme ja investeeringuid täiendavad reformid, mille eesmärk on suurendada konkurentsi
jäätmekäitluse ja kohalike avalike teenuste valdkonnas ettevõtluskeskkonna reformi komponendi
raames ning parandada veetarbimist põllumajanduses. See komponent vastab riigipõhistele
soovitustele suunata investeeringud rohepöördesse, sealhulgas ringmajandusse. Selle komponendi raames tehtavad investeeringud ja reformid aitavad täita 2020. ja 2019. aastal
Itaaliale esitatud riigipõhiseid soovitusi vajaduse kohta „keskenduda investeeringute tegemisel rohe-
ja digipöördele, eelkõige [...] jäätme- ja veemajandusele“ (riigipõhine soovitus 3, 2020) ning
„keskenduda investeeringutega seotud majanduspoliitikas [...]-le ja taristu kvaliteedile, võttes arvesse
ka piirkondlikke erinevusi“ (riigipõhine soovitus 3, 2019). Lähtudes meetmete kirjeldusest taaste- ja vastupidavuskavas ja võttes arvesse põhimõtte „Ei kahjusta
oluliselt“ tehniliste suuniste (2021/C58/01) kohaseid leevendavaid samme, mis kavas on sätestatud,
võib eeldada, et ükski selle komponendi meede ei kahjusta määruse (EL) 2020/852 artikli 17
tähenduses oluliselt keskkonnaeesmärke.
D.1. Tagastamatu rahalise toetusega seotud reformide ja investeeringute kirjeldus
Ringmajandus
Reform 1.1 – Riiklik ringmajanduse strateegia See reform seisneb laiapõhjalise riikliku ringmajanduse strateegia vastuvõtmises, mis hõlmab uut
jäätmete digitaalse jälgitavuse süsteemi, maksusoodustusi ringlussevõtu ja teiseste toorainete
kasutamise toetamiseks, keskkonnamaksude läbivaatamist, õigust korduskasutada ja parandada,
laiendatud tootjavastutuse (laiendatud tootjavastutus) ja konsortsiumide süsteemi reformi,
olemasolevate regulatiivsete vahendite (nt jäätmete kõrvaldamist käsitlevad õigusaktid ja
keskkonnahoidliku riigihanke minimaalsed keskkonnakriteeriumid) toetamist ning tööstussümbioosi
projekti toetamist. Laiendatud tootjavastutuse ja konsortsiumide süsteemi reformimisel käsitletakse ka
vajadust keskkonnapanuse tõhusama kasutamise järele, et tagada läbipaistvate ja
mittediskrimineerivate kriteeriumide kohaldamine. Ökoloogilise ülemineku ministeeriumi (MITE)
juhtimisel luuakse spetsiaalne järelevalveasutus, mille eesmärk on jälgida konsortsiumisüsteemide
toimimist ja tõhusust. Meede on suunatud kõigile konsortsiumidele (mitte ainult CONAI
pakendamissüsteemile).
Reform 1.3 – Tehniline tugi kohalikele omavalitsustele Reform seisneb selles, et valitsus pakub kohalikele omavalitsustele tehnilist tuge ELi ja riiklike
keskkonnaalaste õigusaktide rakendamiseks, jäätmekäitlust ja hankemenetlusi käsitlevate kavade ja
projektide väljatöötamiseks. Pakkumismenetluste toetamisega tagatakse, et jäätmekäitluse
kontsessioone antakse läbipaistval ja mittediskrimineerival viisil, suurendades konkurentsiprotsesse,
et saavutada avalike teenuste paremad standardid. See reform toetab seega ettevõtluskeskkonna
reformi komponendis kavandatud jäätmekäitlusreformide rakendamist. Tehniline tugi hõlmab ka
keskkonnahoidlikke riigihankeid.
Investeering 2.1 – Põllumajandusliku toidutööstuse, kalanduse ja vesiviljeluse,
metsanduse, lillekasvatuse ja taimekasvatuse sektori logistikakava Selle investeeringu eesmärk on soodustada heitkoguste vähendamist põllumajandusliku toidutööstuse
transpordi- ja logistikaetapis, edendades sektori digitaliseerimist ja taastuvenergia kasutamist. Meede
171
seisneb toetuse andmises materiaalsetesse ja immateriaalsetesse varadesse tehtavatele
investeeringutele.
Investeering 2.2 – Põllumajanduslik päikesepark Selle investeeringu eesmärk on suurendada põllumajandussektori kestlikkust ja konkurentsivõimet.
Meede seisneb toetuse andmises investeeringuteks põllumajandus-, loomakasvatus- ja
agrotööstussektori struktuuridesse päikesepaneelide paigaldamiseks ning täiendavateks sekkumisteks.
Investeering 2.3 – Innovatsioon ja mehhaniseerimine põllumajandus- ja toidusektoris Selle investeeringu eesmärk on edendada innovatsiooni põllumajandus- ja toidusektoris. Meede
seisneb toetuse andmises investeeringuteks materiaalsesse ja immateriaalsesse varasse.
Investeering 3.3 – Kultuur ning teadlikkus keskkonnateemadest ja -probleemidest Selle investeeringu eesmärk on kavandada ja toota digitaalset infosisu, et suurendada teadlikkust
keskkonna- ja kliimaprobleemidest. Investeering seisneb veebipõhise tellimisvaba platvormi
loomises, et luua keskkonnaga seotud teemasid käsitlevate õppe- ja meelelahutusmaterjalide hoidla.
172
D.2. Tagastamatu rahalise toetuse eesmärgid, sihid, näitajad ning seire ja rakendamise ajakava
Järjekorra- number
Seotud meede (reform või
investeering) Eesmärk/siht Nimetus
Kvalitatiivsed näitajad
(vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
M2C1–1 Reform 1.1 – Riiklik
ringmajanduse strateegia
Eesmärk
Riikliku ringmajanduse strateegia
vastuvõtmist käsitleva ministri käskkirja
jõustumine
Ministri käskkirja säte jõustumise kohta
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2022
Ministri dekreet riikliku ringmajanduse strateegia vastuvõtmise kohta sisaldab vähemalt järgmisi meetmeid:
• uus digitaalne jäätmete jälgitavuse süsteem, mis toetab ühelt poolt toorainete järelturu arendamist (luues selge raamistiku teisese toorme tarnimiseks) ja teiselt poolt kontrolliasutusi ebaseadusliku jäätmekäitluse ennetamisel ja selle vastu võitlemisel.
• maksusoodustused ringlussevõtu ja teisese toorme kasutamise toetamiseks;
• jäätmete keskkonnamaksusüsteemi läbivaatamine, et muuta ringlussevõtt mugavamaks kui prügilasse ladestamine ja põletamine kogu riigi territooriumil;
• õigus korduskasutamisele ja parandamisele;
• laiendatud tootjavastutuse (laiendatud tootjavastutus) ja konsortsiumide süsteemi reform, et toetada ELi eesmärkide saavutamist,
173
Järjekorra- number
Seotud meede (reform või
investeering) Eesmärk/siht Nimetus
Kvalitatiivsed näitajad
(vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
luues MITE juhtimisel spetsiaalse järelevalveasutuse, mille eesmärk on jälgida konsortsiumide süsteemide toimimist ja tõhusust;
• olemasolevate regulatiivsete vahendite toetamine: Jäätmealased õigusaktid (riiklikud ja piirkondlikud), minimaalsed keskkonnakriteeriumid keskkonnahoidlike riigihangete raames. EOW ja CAM arendamisel/ajakohastamise l keskendutakse eelkõige ehitusele, tekstiilile, plastile ning elektri- ja elektroonikaseadmete jäätmetele.
• tööstussümbioosi projekti toetamine regulatiivsete ja rahastamisvahendite kaudu.)
M2C1–2
Reform 1.3 – Tehniline tugi
kohalikele omavalitsustele
Eesmärk
Kohalike ametiasutuste
toetamiseks mõeldud suutlikkuse
suurendamise tegevuskava
väljatöötamise kokkuleppe
heakskiitmine
Heakskiidetud lepingu avaldamine
ministeeriumi veebisaidil
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2022
Kiidetakse heaks kokkulepe töötada välja suutlikkuse suurendamise tegevuskava, et toetada kohalikke ametiasutusi seaduses (seadusandlik dekreet nr 50/2016 riigihangete kohta) sätestatud minimaalsete keskkonnakriteeriumide rakendamisel hankemenetlustes keskkonnahoidlike riigihangete raames ja toetusmeetme
174
Järjekorra- number
Seotud meede (reform või
investeering) Eesmärk/siht Nimetus
Kvalitatiivsed näitajad
(vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
alustamisel. Tehnilise toe kohalikele omavalitsustele (piirkonnad, provintsid ja omavalitsused) tagab valitsus (ökoloogilise ülemineku ministeerium, majandusarengu ministeerium ja muu asjakohane ministeerium) asutusesiseste ettevõtete kaudu. Tehniline tugi hõlmab järgmist:
• tehniline abi ELi ja riiklike keskkonnaalaste õigusaktide rakendamiseks;
• jäätmekäitlusega seotud kavade ja projektide väljatöötamise toetamine;
• pakkumismenetluste toetamine, muu hulgas selleks, et tagada jäätmekäitluse kontsessioonide andmine läbipaistval ja mittediskrimineerival viisil, suurendades konkurentsiprotsesse, et saavutada avalike teenuste paremad standardid.
Ökoloogilise ülemineku ministeerium töötab välja spetsiaalse suutlikkuse suurendamise tegevuskava, et toetada kohalikke ametiasutusi ja kutselisi avaliku sektori hankijaid seaduses (seadusandlik dekreet nr 50/2016 riigihangete kohta) sätestatud
175
Järjekorra- number
Seotud meede (reform või
investeering) Eesmärk/siht Nimetus
Kvalitatiivsed näitajad
(vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
minimaalsete keskkonnakriteeriumide kohaldamisel hankemenetlustes keskkonnahoidlike riigihangete raames.
M2C1–3
Investeering 2.1: Põllumajandusliku
toidutööstuse, kalanduse ja vesiviljeluse, metsanduse,
lillekasvatuse ja taimekoolide sektori
logistikakava
Eesmärk
Lõpliku paremusjärjestuse
avaldamine loogiliste stiimulite kava
raames
Avaldamine ministeeriumi
veebisaidil või muus tugikanalis
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2022
Lõplik järjestus määratakse kindlaks heakskiitmisdekreediga. Logistiliste stiimulite kava hõlmab järgmist: a) rahastamiskõlblikkuse kriteeriumid, millega tagatakse, et valitud projektid vastavad põhimõtte „ei kahjusta oluliselt“ tehnilistele suunistele (2021/C58/01), kasutades välistamisnimekirja ning nõuet järgida asjakohaseid ELi ja riiklikke keskkonnaalaseid õigusakte. b) Kohustus, et investeeringu kliimapanus vastavalt määruse (EL) 2021/241 VI lisas esitatud metoodikale moodustab vähemalt 32 % taaste- ja vastupidavusrahastust toetatavate investeeringute kogukuludest. C) Kohustus, et investeeringu digipanus vastavalt määruse (EL) 2021/241 VII lisas esitatud metoodikale moodustab vähemalt 27 % taaste- ja vastupidavusrahastust toetatava investeeringu kogukuludest. d) kohustus esitada aruanne meetme rakendamise kohta kava kehtivusaja keskel ja kava lõppedes.
M2C1–4 Investeering 2.2: Põllumajandus-
Siht Vahendite eraldamine
toetusesaajatele PUUDUVAD Protsent 0 30 4. kv 2022
Selliste toetust saavate projektide kindlaksmääramine, mille koguväärtus
176
Järjekorra- number
Seotud meede (reform või
investeering) Eesmärk/siht Nimetus
Kvalitatiivsed näitajad
(vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
päikesepark protsendina investeeringule
eraldatud rahaliste vahendite
kogusummast
moodustab vähemalt 30 % investeeringule eraldatud rahaliste vahendite kogusummast. Investeering tehakse kahe erineva menetluse kaudu, mis on juba olemas ja mis refinantseeritakse. Nende menetlustega nähakse ette laenude väljamaksmine nõuetele vastavatele ja taotluse esitanud äriühingutele.
M2C1–5 Investeering 2.2: Põllumajandus-
päikesepark Siht
Vahendite eraldamine toetusesaajatele
protsendina investeeringule
eraldatud rahaliste vahendite
kogusummast
PUUDUVAD Protsent 19 32 4. kv 2023
Määratakse kindlaks toetust saavad projektid, mille koguväärtus moodustab vähemalt 32 % investeeringule eraldatud rahaliste vahendite kogusummast. Toetuse andmise menetlusega nähakse ette toetuste või muude stiimulite väljamaksmine ettevõtjatele, kes vastavad nõuetele ja esitavad taotluse.
M2C1–6 Investeering 2.2: Põllumajandus-
päikesepark Siht
Vahendite eraldamine toetusesaajatele
protsendina investeeringule
eraldatud rahaliste vahendite
kogusummast
PUUDUVAD Protsent 32 63.5 2. kv 2024
Selliste toetust saavate projektide kindlaksmääramine, mille koguväärtus moodustab vähemalt 63,5 % investeeringuks eraldatud rahaliste vahendite kogusummast. Toetuse andmise menetluses nähakse ette toetuste või muude stiimulite väljamaksmine nõuetele vastavatele ja taotluse esitanud äriühingutele.
M2C1–6a Investeering 2.2: Põllumajandus-
päikesepark Siht
Vahendite eraldamine toetusesaajatele
protsendina investeeringule
eraldatud rahaliste vahendite
PUUDUVAD Protsent 63.5 100 4. kv 2024
Selliste toetust saavate projektide kindlaksmääramine, mille koguväärtus on vähemalt 100 % investeeringule eraldatud täiendavatest rahalistest vahenditest. Toetuse andmise menetlusega nähakse ette toetuste
177
Järjekorra- number
Seotud meede (reform või
investeering) Eesmärk/siht Nimetus
Kvalitatiivsed näitajad
(vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
kogusummast või muude stiimulite väljamaksmine ettevõtjatele, kes vastavad nõuetele ja esitavad taotluse.
M2C1–7
Investeering 2.3: Innovatsioon ja
mehhaniseerimine põllumajandus- ja
toidusektoris
Siht
Lõplike pingeridade avaldamine koos lõplike vahendite
saajate identifitseerimisega.
PUUDUVAD Number 0 10 000 4. kv 2024
Tehakse kindlaks vähemalt 10 000 lõplikku vahendite saajat, kes investeerivad innovatsiooni ringmajanduses ja biomajanduses. Investeeringute puhul võetakse arvesse vähemalt ühte järgmistest: – Rohkemate asendamine saastavad maastikusõidukid – Täppispõllumajanduse ja -masinate kasutuselevõtt põllumajanduses 4.0 – Oliiviveskite vananenud rajatiste väljavahetamine Et järgida põhimõtet „Ei ole lubatud“. „Olulise kahju“ põhimõte, maastikusõidukid peavad olema heitevabad või sõitma üksnes biometaaniga, mis peab vastama direktiivis 2018/2001 (II taastuvenergia direktiiv) sätestatud kriteeriumidele. Biokütuse ja biometaani ning gaasi ja biokütuse tootjad peavad esitama sõltumatute hindajate väljastatud sertifikaadid (kestlikkuse tõendamine), nagu on sätestatud direktiivis 2018/2001. Käitaja ostab päritolutagatise sertifikaadid, mis vastavad eeldatavale kütusekasutusele.
178
Järjekorra- number
Seotud meede (reform või
investeering) Eesmärk/siht Nimetus
Kvalitatiivsed näitajad
(vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
M2C1–8
Investeering 2.3: Innovatsioon ja
mehhaniseerimine põllumajandus- ja
toidusektoris
Siht Elluviidud projektid PUUDUVAD Number 0 9608 2. kv 2026
Haldusakt(id), millega kinnitatakse, et ellu on viidud vähemalt 9 608 projekti ühes või mitmes järgmises valdkonnas: – Saastavamate maastikusõidukite väljavahetamine Täppispõllumajanduse kasutuselevõtt, sealhulgas innovatsioon niisutussüsteemides ja veemajanduses – Oliiviveskite vananenud rajatiste väljavahetamine. Olulise kahju ärahoidmise põhimõtte järgimiseks peavad maastikusõidukid olema heitevabad või sõitma üksnes biometaaniga, mis vastab direktiivis 2018/2001 (II taastuvenergia direktiiv) sätestatud kriteeriumidele. Biokütuse ja biometaani ning gaasi ja biokütuse tootjad peavad esitama sõltumatute hindajate väljastatud sertifikaadid (kestlikkuse tõendamine), nagu on sätestatud direktiivis 2018/2001. Käitaja ostab päritolutagatise sertifikaadid, mis vastavad eeldatavale kütusekasutusele.
M2C1–9 Investeering 2.2: Põllumajandus-
päikesepark Siht
Paigaldatud päikeseenergia tootmisvõimsus
PUUDUVAD kW 0 1 470 000 2. kv 2026 Paigaldatud on vähemalt 1 470 000 kW päikeseenergia tootmisvõimsust.
M2C1–11
Investeering 3.3: Kultuur ja teadlikkus keskkonnateemadest
ja -probleemidest
Eesmärk Veebiplatvormi käivitamine ja
lepingud autoritega
Teade sisutootjatega sõlmitud lepingu
allkirjastamise kohta PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2022
Veebiplatvormi avalik käivitamine ja lõplike lepingute allkirjastamine „sisutootjatega“. Projektide eesmärk on töötada välja vähemalt 180
179
Järjekorra- number
Seotud meede (reform või
investeering) Eesmärk/siht Nimetus
Kvalitatiivsed näitajad
(vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
netisaadet, koolipõhist videot ja videosisu, mis on koostatud ja kättesaadavad keskkonnaalase ülemineku veebiplatvormil.
M2C1–12
Investeering 3.3: Kultuur ja teadlikkus keskkonnateemadest
ja -probleemidest
Siht Netisaated
keskkonnaalase ülemineku kohta
PUUDUVAD Number 0 180 2. kv 2025 Vähemalt 180 netisaadet, mis on avaldatud veebiplatvormil.
180
D.3. Laenuga seotud reformide ja investeeringute kirjeldus
Reform 1.2 – Jäätmekäitluse riiklik programm See reform seisneb ulatusliku riikliku jäätmekäitlusprogrammi vastuvõtmises, mille eesmärk on saavutada
jäätmete korduskasutamiseks, ringlussevõtuks ja taaskasutamiseks ettevalmistamise kõrgeim tase,
integreeritud jäätmekäitluseks vajalike rajatiste võrgustiku kohandamises, lõppladustamise kui lõpliku ja
jääkvariandi minimeerimises, järelevalvesüsteemide loomises, Itaalia vastu uute rikkumismenetluste
algatamise vältimises, jäätmete vähese kogumise vastu võitlemises, prügilasse ladestamise takistamises ja
piirkondlike jäätmeprogrammide vastastikuse täiendavuse tagamises, Euroopa ja riiklike jäätmealaste
õigusaktide eesmärkide saavutamise võimaldamises ning jäätmete ebaseadusliku ladestamise ja
vabaõhupõletamise vastu võitlemises.
Investeering 1.1 – Uute jäätmekäitlusrajatiste rakendamine ning olemasolevate rajatiste
ajakohastamine ja ringmajanduse juhtprojektid Selle investeeringu eesmärk on parandada jäätmekäitlust ja toetada ringmajandust. Investeering seisneb uute
käitlus-/ringlussevõtujaamade ehitamise või olemasolevate ajakohastamise projektide rahastamises ning eri
jäätmevoogude liigiti kogumise toetamises ja digitaliseerimises.
Investeering 2.1 – Põllumajandusliku toidutööstuse, kalanduse ja vesiviljeluse, metsanduse,
lillekasvatuse ja taimekasvatuse sektori logistikakava Selle investeeringu eesmärk on soodustada heitkoguste vähendamist põllumajandusliku toidutööstuse
transpordi- ja logistikaetapis, edendades sektori digitaliseerimist ja taastuvenergia kasutamist. Meede seisneb
toetuse andmises materiaalsetesse ja immateriaalsetesse varadesse tehtavatele investeeringutele.
Investeering 3.1 – Rohelised saared
Meetme eesmärk on toetada rohepööret 19 omavahel ühendamata väikesaarel Itaalias. See investeering
hõlmab energeetika (mis võib hõlmata muu hulgas taastuvaid energiaallikaid, võrku või energiatõhusust),
vee (mis võib hõlmata magestamist, kuid ei piirdu sellega), transpordi (mis võib hõlmata jalgrattateid, heiteta
busse või laevu) ja jäätmete (mis võivad hõlmata jäätmete eraldamist, kuid ei piirdu sellega) projektide
rahastamist ja rakendamist 19 väikesaarel.
Investeering 3.2 – Rohelised kogukonnad
Selle investeeringu eesmärk on toetada rohepööret maa- ja mägipiirkondades (nn rohelised kogukonnad). See
investeering seisneb roheliste kogukondade projektide toetamises.
Investeering 3.4 – Fondo Rotativo Contratti di Filiera (FCF), et toetada tarneahelalepinguid
põllumajandusliku toidutööstuse, kalanduse ja vesiviljeluse, metsanduse, lillekasvatuse ja
taimekasvatuse sektoris See meede hõlmab avaliku sektori investeeringut rahastusse Fondo Rotativo Contratti di Filiera (FCF), et
stimuleerida erainvesteeringuid ja parandada juurdepääsu rahastamisele Itaalia põllumajanduslikus
toidutööstuses, kalanduses ja vesiviljeluses, metsanduses, lillekasvatuses ja taimekoolides. Rahastu toimib
toetuste ja subsideeritud laenude andmise kaudu otse ISMEA (Istituto di Servizi per il Mercato Agricolo
Alimentare) kaudu. Rahastut haldab rakenduspartnerina ISMEA. Rahastu hõlmab järgmisi tooteliike:
• Toetada ettevõtteid, ettevõtete rühmi või põllumajandustootjate ühendusi ning teadus- ja
teadmiste levitamise organisatsioone põllumajandusliku toidutööstuse, kalanduse ja
vesiviljeluse, metsanduse, lillekasvatuse ja taimekoolide sektoris, parandades tootmisprotsesse,
lisades järgmiste tegevuste hulka:
o Parandada tootmisprotsesside keskkonnasäästlikkust, investeerides materiaalsesse ja
immateriaalsesse varasse, et oluliselt suurendada sihipäraste tootmisprotsesside energia-,
vee- ja ressursitarbimise tõhusust;
181
o Investeeringud teadmistesse, koolitusse, teadusuuringutesse ja innovatsiooni,
tehnosiirdesse ja arendusprojektidesse, mis võivad toetada ka tarneahela eri osalejate
vaheliste suhete ümberkorraldamist, et suurendada tootmisprotsesside kestlikkust;
o Investeeringud ettevõtete digitaliseerimisse, sealhulgas e-kaubandusse ja
kujunemisjärgus tehnoloogiatesse;
o Fotogalvaaniliste ja päikesepaneelide paigaldamine
Meetme eesmärk on vähendada kasvuhoonegaaside heidet, toidujäätmeid ning pestitsiidide ja
antimikroobikumide kasutamist, parandada energiatõhusust ning suurendada taastuvenergia tootmist ja
kasutamist. Rahastusse tehtava investeeringu rakendamiseks allkirjastavad ministeerium ja ISMEA rakenduslepingu, mis
sisaldab järgmist: 1. Rahastu otsustusprotsessi kirjeldus: Rahastu lõplikud investeerimisotsused teeb
investeeringute komitee või muu vastav samaväärne juhtorgan ning need kiidetakse heaks
valitsusest sõltumatute liikmete häälteenamusega.
2. Seotud investeerimispoliitika põhinõuded, mis hõlmavad järgmist:
a. Finantstoote/finantstoodete ja rahastamiskõlblike lõplike abisaajate kirjeldus;
b. Nõue, et kõik toetatavad investeeringud peavad olema majanduslikult elujõulised;
c. Nõue järgida põhimõtet „ei kahjusta oluliselt“, nagu on sätestatud põhimõtte „ei
kahjusta oluliselt“ tehnilistes suunistes (2021/C58/01). Eelkõige jäetakse
investeerimispoliitikaga rahastamiskõlblikkuse alt välja järgmised tegevused ja varad: i)
fossiilkütustega seotud tegevus ja varad, sealhulgas allkasutus, ii) ELi heitkogustega
kauplemise süsteemi21 (HKS) alla kuuluvad tegevused ja varad, millega saavutatakse
prognoositud kasvuhoonegaaside heide, mis ei ole asjaomastest võrdlusalustest
väiksem,22 iii) prügilate, jäätmepõletustehaste ja mehaanilis-bioloogilise töötlemise
jaamadega seotud tegevus23 ja varad24.
d. Nõue, et rahastu lõplikud toetusesaajad ei saa samade kulude katmiseks toetust
muudest liidu vahenditest.
3. Rakenduslepinguga hõlmatud summa, rakenduspartneri tasude struktuur ja nõue
reinvesteerida mis tahes tagasisaadavad vahendid vastavalt rahastu investeerimispoliitikale.
4. Seire-, auditi- ja kontrollinõuded, sealhulgas:
a. Rakenduspartneri järelevalvesüsteemi kirjeldus, et anda aru kaasatud investeeringute
kohta.
b. Rakenduspartneri selliste menetluste kirjeldus, millega tagatakse pettuste,
korruptsiooni ja huvide konfliktide ennetamine, avastamine ja kõrvaldamine.
c. Kohustus kontrollida iga tehingu puhul enne rahastamiskohustuse võtmist tehingu
rahastamiskõlblikkust kooskõlas rakenduslepingus sätestatud nõuetega;
21 Välja arvatud a) varad ja tegevused maagaasi kasutavas elektri- ja/või soojusenergia tootmises ning sellega seotud
ülekande- ja jaotustaristus, mis vastavad põhimõtte „ei kahjusta oluliselt“ tehniliste suuniste (2021/C58/01) III lisas
sätestatud tingimustele, ning b) alapunktis ii osutatud tegevused ja varad, mille puhul fossiilkütuste kasutamine on
fossiilkütustevabale käitamisele õigeaegseks üleminekuks ajutine ja tehniliselt vältimatu. 22 Kui toetatava tegevusega saavutatakse prognoositud kasvuhoonegaaside heide, mis ei ole asjaomastest võrdlusalustest
oluliselt väiksem, esitatakse selgitus selle kohta, miks see ei ole võimalik. Saastekvootide tasuta eraldamise
võrdlusalused saastekvootidega kauplemise süsteemi kohaldamisalasse kuuluvate tegevuste jaoks on sätestatud
komisjoni rakendusmääruses (EL) 2021/447. 23 Välistamist ei kohaldata meetme tegevuste suhtes, mis toimuvad üksnes ringlussevõetamatute ohtlike jäätmete
töötlemisega tegelevates jaamades, ega olemasolevate jaamade suhtes, kui meetme tegevuste eesmärk on suurendada
energiatõhusust, koguda heitgaase ladustamiseks või kasutamiseks või taaskasutada põletustuhas leiduvaid materjale,
tingimusel et need tegevused ei suurenda jaamade jäätmetöötlusvõimsust ega pikenda nende kasutusiga; tõendid selle
kohta tuleb esitada iga jaama kohta eraldi. 24 Välistamist ei kohaldata meetme tegevuste suhtes, mis toimuvad olemasolevates mehhaanilis-bioloogilise töötlemise
jaamades, kus nende tegevuste eesmärk on suurendada energiatõhusust või moderniseerida eraldatud jäätmete
ringlussevõttu biojäätmete kompostimiseks ja biojäätmete anaeroobseks lagundamiseks, tingimusel et need tegevused ei
suurenda jaamade jäätmetöötlusvõimsust ega pikenda nende kasutusiga; tõendid selle kohta tuleb esitada iga jaama
kohta eraldi.
182
d. Kohustus teha riskipõhiseid järelauditeid kooskõlas ISMEA auditikavaga. Auditite
käigus veendutakse, et i) kontrollisüsteemid on tõhusad, muu hulgas pettuste,
korruptsiooni ja huvide konfliktide avastamisel, ii) põhimõtte „ei kahjusta oluliselt“
järgimine, riigiabi eeskirjad ning kliima- ja digieesmärkide nõuded kooskõlas taaste- ja
vastupidavusrahastu määruse VI lisaga ning taaste- ja vastupidavusrahastu määruse VII
lisaga; ning iii) järgitakse nõuet, et rahastu lõplikud toetusesaajad ei tohi olla saanud
samade kulude katmiseks toetust muudest liidu vahenditest. Auditite käigus
kontrollitakse ka tehingute seaduslikkust ning kohaldatavate rakendus- ja
rahastamislepingute tingimuste täitmist.
5. Rakenduspartneri tehtavatele kliimainvesteeringutele esitatavad nõuded: vähemalt
1 848 000 000,00 eurot taaste- ja vastupidavusrahastu investeeringutest rahastusse aitab kaasa
kliimamuutustega seotud eesmärkide saavutamisele kooskõlas taaste- ja vastupidavusrahastu
määruse VI lisaga25.
Investeering 4 – Põllumajandus-päikesepargi rajatis Meede hõlmab avaliku sektori investeeringut toetuskavasse, põllumajandus-päikesepargi rahastusse, et
stimuleerida erainvesteeringuid ja parandada rahastamisvõimalusi Itaalia agrotööstussektoris. Kava toimib
toetuste andmise kaudu otse erasektorile. Kava haldab rakenduspartnerina Gestore Servizi Energetici S.p.A. (GSE). Kavaga toetatakse investeeringuid
põllumajandus-, loomakasvatus- ja agrotööstussektori struktuuridesse päikesepaneelide paigaldamiseks ning
täiendavaid sekkumisi. Projektiettepanekute hindamisel võetakse positiivselt arvesse kuulumist võrgustikku
„rete del lavoro agricolo di qualità“. Kavasse tehtava investeeringu rakendamiseks allkirjastavad Itaalia ja GSE rakenduskokkuleppe, mis sisaldab
järgmist: 1. Kava otsustusprotsessi kirjeldus: Kava lõpliku rahastamisotsuse teeb investeerimiskomitee
või muu asjakohane samaväärne juhtorgan ja see kiidetakse heaks valitsusest sõltumatute liikmete
häälteenamusega.
2. Seotud toetuspoliitika põhinõuded,mis hõlmavad järgmist:
a. Antud toetuste ja rahastamiskõlblike lõplike abisaajate kirjeldus.
b. Nõue, et kõik toetatavad investeeringud peavad olema majanduslikult elujõulised.
c. Nõue järgida põhimõtet „ei kahjusta oluliselt“, nagu on sätestatud põhimõtte „ei kahjusta
oluliselt“ tehnilistes suunistes (2021/C58/01). Eelkõige jäetakse toetuspõhimõtetega
rahastamiskõlblikkuse alt välja järgmised tegevused ja varad: i) fossiilkütustega seotud tegevus
ja varad, sealhulgas allkasutus, ii) ELi heitkogustega kauplemise süsteemi26 (HKS) alla
kuuluvad tegevused ja varad, millega saavutatakse prognoositud kasvuhoonegaaside heide, mis
ei ole asjaomastest võrdlusalustest väiksem,27 iii) prügilate, jäätmepõletustehaste ja mehaanilis-
bioloogilise töötlemise jaamadega seotud tegevus28 ja varad29.
25 Konkreetsete projektidega seotud lõplikud toetusesaajad peavad kliimaalase panuse arvutamiseks esitama iga
toetatava projekti kohta valitud sekkumisvaldkonna põhjenduse koos projekti kirjeldusega. Kliimaalase panuse
arvutamiseks peavad lõplikud abisaajad omakapitalist, kvaasiomakapitalist, äriühingu võlakirjadest või samaväärsetest
vahenditest, mis ei ole suunatud konkreetsetele projektidele, valitud sekkumisvaldkonda(sid) põhjendama.
Rakenduspartner peab samuti esitama liikmesriigile poolaastaaruande iga projekti/tegevuse rakendamise kohta. 26 Välja arvatud a) varad ja tegevused maagaasi kasutavas elektri- ja/või soojusenergia tootmises ning sellega seotud
ülekande- ja jaotustaristus, mis vastavad põhimõtte „ei kahjusta oluliselt“ tehniliste suuniste (2021/C58/01) III lisas
sätestatud tingimustele, ning b) alapunktis ii osutatud tegevused ja varad, mille puhul fossiilkütuste kasutamine on
fossiilkütustevabale käitamisele õigeaegseks üleminekuks ajutine ja tehniliselt vältimatu. 27 Kui toetatava tegevusega saavutatakse prognoositud kasvuhoonegaaside heide, mis ei ole asjaomastest võrdlusalustest
oluliselt väiksem, esitatakse selgitus selle kohta, miks see ei ole võimalik. Saastekvootide tasuta eraldamise
võrdlusalused saastekvootidega kauplemise süsteemi kohaldamisalasse kuuluvate tegevuste jaoks on sätestatud
komisjoni rakendusmääruses (EL) 2021/447. 28 Välistamist ei kohaldata meetme tegevuste suhtes, mis toimuvad üksnes ringlussevõetamatute ohtlike jäätmete
töötlemisega tegelevates jaamades, ega olemasolevate jaamade suhtes, kui meetme tegevuste eesmärk on suurendada
energiatõhusust, koguda heitgaase ladustamiseks või kasutamiseks või taaskasutada põletustuhas leiduvaid materjale,
183
d. Nõue, et kava lõplikud abisaajad ei tohi samade kulude katmiseks saada toetust muudest
liidu vahenditest.
3. Rakenduslepinguga hõlmatud summa, rakenduspartneri tasude struktuur ja nõue kasutada
kava kasutamata tulu, sealhulgas pärast 2026. aastat, samadel poliitilistel eesmärkidel.
4. Seire-, auditi- ja kontrollinõuded, sealhulgas:
1. Rakenduspartneri kasutatud toetustest aruandmise järelevalvesüsteemi kirjeldus.
2. Rakenduspartneri selliste menetluste kirjeldus, millega tagatakse pettuste,
korruptsiooni ja huvide konfliktide ennetamine, avastamine ja kõrvaldamine.
3. Kohustus kontrollida enne tegevuse jaoks toetuse andmist iga tegevuse
rahastamiskõlblikkust kooskõlas rakenduslepingus sätestatud nõuetega.
4. Kohustus teha riskipõhiseid järelauditeid kooskõlas GSE auditikavaga. Auditite
käigus veendutakse, et i) kontrollisüsteemid on tõhusad, muu hulgas pettuste,
korruptsiooni ja huvide konfliktide avastamisel, ii) põhimõtte „ei kahjusta oluliselt“
järgimine, riigiabi eeskirjad, kliimaeesmärgi nõuded; ning iii) järgitakse nõuet, et kava
lõplikud abisaajad ei tohi olla saanud samade kulude katmiseks toetust muudest liidu
vahenditest. Auditite käigus kontrollitakse ka tehingute seaduslikkust ja kohaldatavate
rakenduslepingu toetuslepingute tingimuste täitmist.
5. Rakenduspartneri tehtavatele kliimainvesteeringutele esitatavad nõuded: vähemalt
633 000 000 eurot taaste- ja vastupidavusrahastu investeeringutest kavasse aitab kaasa
kliimamuutustega seotud eesmärkide saavutamisele kooskõlas taaste- ja vastupidavusrahastu
määruse VI lisaga30.
tingimusel et need tegevused ei suurenda jaamade jäätmetöötlusvõimsust ega pikenda nende kasutusiga; tõendid selle
kohta tuleb esitada iga jaama kohta eraldi. 29 Välistamist ei kohaldata meetme tegevuste suhtes, mis toimuvad olemasolevates mehhaanilis-bioloogilise töötlemise
jaamades, kus nende tegevuste eesmärk on suurendada energiatõhusust või moderniseerida eraldatud jäätmete
ringlussevõttu biojäätmete kompostimiseks ja biojäätmete anaeroobseks lagundamiseks, tingimusel et need tegevused ei
suurenda jaamade jäätmetöötlusvõimsust ega pikenda nende kasutusiga; tõendid selle kohta tuleb esitada iga jaama
kohta eraldi. 30 Konkreetsete projektidega seotud lõplikud toetusesaajad peavad kliimaalase panuse arvutamiseks esitama iga
toetatava projekti kohta valitud sekkumisvaldkonna põhjenduse koos projekti kirjeldusega. Kliimaalase panuse
arvutamiseks peavad lõplikud abisaajad omakapitalist, kvaasiomakapitalist, äriühingu võlakirjadest või samaväärsetest
vahenditest, mis ei ole suunatud konkreetsetele projektidele, valitud sekkumisvaldkonda(sid) põhjendama.
Rakenduspartner peab samuti esitama liikmesriigile poolaastaaruande iga projekti/tegevuse rakendamise kohta.
184
D.4. Laenu eesmärgid, sihid, näitajad ning seire ja rakendamise ajakava
Järjekorra- number
Seotud meede (reform või investeering)
Eesmärk/siht Nimetus Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
M2C1–13 Reform 1.2 – Riiklik
jäätmekäitlusprogramm Eesmärk
Riiklikku jäätmekäitlusprogrammi
käsitleva ministri käskkirja jõustumine
Seaduse jõustumisele viitav säte
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2022
Ministri käskkiri riikliku jäätmekäitlusprogrammi kohta sisaldab vähemalt järgmisi eesmärke: saavutada jäätmete korduskasutamiseks ettevalmistamise, ringlussevõtu ja taaskasutamise kõrgeim tase, saavutades vähemalt seadusandliku dekreedi 152/06 artiklis 181 sätestatud eesmärgid ning võttes arvesse ka laiendatud tootjavastutuse süsteeme;
i.kohandada ringmajanduse arendamiseks integreeritud jäätmekäitluseks vajalike rajatiste võrku, tagades punktis a sätestatud eesmärkide saavutamiseks vajaliku suutlikkuse ja seega minimeerides lõplikku kõrvaldamist kui lõplikku ja jääkvõimalust kooskõlas läheduse põhimõttega ja võttes arvesse seadusandliku dekreedi 152/06 artiklis 180 sätestatud jäätmetekke vältimise riikliku planeerimise raames määratletud jäätmetekke vältimise eesmärke;
ii.kehtestada piisav järelevalve programmi rakendamise üle, et võimaldada pidevalt kontrollida selle eesmärkide täitmist ja võimalikku vajadust võtta
185
Järjekorra- number
Seotud meede (reform või investeering)
Eesmärk/siht Nimetus Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
kavandatud meetmete saavutamiseks vastu korrigeerivad vahendid;
iii.hoida ära uute rikkumismenetluste algatamine Itaalia Vabariigi vastu, kes ei ole rakendanud jäätmetsüklite kavandamist käsitlevaid Euroopa määrusi;
iv.võidelda jäätmete vähese kogumise vastu ja vältida prügilasse ladestamist (vt ka riiklik ringmajanduse strateegia);
v.piirkondlik jäätmekäitlustehas täiendab riiklikku jäätmekäitlusprogrammi;
vi.ületada jäätmekäitluse puudujäägid ja piirkondlik lõhe seoses rajatiste võimsuse ja kvaliteedistandarditega riigi territooriumi eri piirkondade ja alade vahel, et taastada viivitused;
vii.saavutada Euroopa ja siseriiklikes õigusaktides sätestatud praegused ja uued eesmärgid;
viii.selleks et võidelda jäätmete ebaseadusliku kaadamise ja põletamise vastu (nt Terra dei Fuochi piirkonnas) meetmete abil, mis hõlmavad uue jäätmete jälgitavuse süsteemi kasutuselevõttu, töötatakse satelliitide, droonide ja
186
Järjekorra- number
Seotud meede (reform või investeering)
Eesmärk/siht Nimetus Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
tehisintellekti tehnoloogiate abil välja toetatud ülemaailmne seiresüsteem ebaseadusliku kaadamise vastu võitlemiseks.
M2C1–14
Investeering 1.1 – Uute jäätmekäitlusrajatiste
rakendamine ja olemasolevate rajatiste
moderniseerimine; Investeering 1.2 – Ringmajanduse
juhtprojektid
Eesmärk Ministri käskkirja
jõustumine.
Ministrite dekreedi vastuvõtmine kohalike omavalitsuste esitatud
projektide valikukriteeriumide heakskiitmiseks.
Avaldamine väljaandes Gazzetta Ufficiale
PUUDUVAD PUUDUVAD 3. kv 2021
Jõustub ministri dekreet omavalitsuste esitatud projektide valikukriteeriumide heakskiitmise kohta. Ministri dekreedis sätestatakse, et projektid valitakse järgmiste kriteeriumide hulgast:
• Kooskõla ELi ja riiklike õigusaktidega ning Euroopa ringmajanduse tegevuskavaga,
• Ringlussevõtu eesmärkide eeldatav paranemine
• Kooskõla piirkondlike ja riiklike planeerimisvahenditega,
• Panus ELi rikkumiste lahendamisse, koostoime muude valdkondlike kavadega (nt PNIEC) ja/või kava muude komponentidega, uuenduslikud tehnoloogiad, mis põhinevad täiemahulistel kogemustel;
• Ettepaneku tehniline kvaliteet.
• Kooskõla ja vastastikune täiendavus ühtekuuluvuspoliitika programmide ja sarnaste projektidega, mida rahastatakse muudest ELi ja riiklikest vahenditest
Sekkumised ei hõlma investeeringuid
187
Järjekorra- number
Seotud meede (reform või investeering)
Eesmärk/siht Nimetus Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
prügilatesse, kõrvaldamisrajatistesse, mehaanilis-bioloogilise töötlemise rajatistesse/mehaanilis-mehaanilistesse töötlemisrajatistesse või jäätmepõletustehastesse kooskõlas põhimõttega „ei kahjusta oluliselt“.
M2C1–15 Reform 1.2
Riiklik jäätmekäitlusprogramm
Siht Ebaseaduslike
prügilate vähendamine (T1)
PUUDUVAD Number 33 11 2. kv 2024 Rikkumismenetlusega NIF 2003/2077 hõlmatud ebaseaduslike prügilate arvu vähendamine 33-lt 11-le (st vähemalt 66 %).
M2C1–15a Reform 1.2
Riiklik jäätmekäitlusprogramm:
Siht Ebaseaduslike prügilate arvu
vähendamine (T2) PUUDUVAD Number 34 14 4. kv 2023
Rikkumismenetlusega 2011/2215 hõlmatud ebaseaduslike prügilate arvu vähendamine 34-lt 14-le (st vähemalt 60 %).
M2C1–15b
Investeering 1.1 – Uute jäätmekäitlusrajatiste
rakendamine ja olemasolevate rajatiste
moderniseerimine
Siht Liigiti kogumise
piirkondlike erinevuste vähendamine
PUUDUVAD Protsendi punktid
22.8 20 4. kv 2023 Liigiti kogumise määrade erinevus riigi keskmise ja halvimate näitajatega piirkonna vahel väheneb 20 protsendipunktini.
M2C1–15 quater
Investeering 1.1 – Uute jäätmekäitlusrajatiste
rakendamine ja olemasolevate rajatiste
moderniseerimine
Eesmärk Biojäätmete liigiti
kogumise kohustuse jõustumine
Seaduse jõustumisele viitav säte
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2023 Biojäätmete liigiti kogumise kohustus kehtib 31. detsembriks 2023 vastavalt ELi ringmajanduse tegevuskavale.
M2C1–16 Reform 1.2
Riiklik jäätmekäitlusprogramm
Siht Ebaseaduslikud
prügilad PUUDUVAD Number 11 0 2. kv 2026
Rikkumismenetlusega 2003/2077 hõlmatud ebaseaduslike prügilate arvu vähendamine 11-lt 0-le.
M2C1–16a Reform 1.2
Riiklik jäätmekäitlusprogramm
Siht Ebaseaduslikud
prügilad PUUDUVAD Number 14 9 2. kv 2024
Rikkumismenetlusega 2011/2215 hõlmatud ebaseaduslike prügilate arvu vähendamine 14-lt 9-le (st vähemalt 75 %)
M2C1–16b
Investeering 1.1 – Uute jäätmekäitlusrajatiste
rakendamine ja
Siht Liigiti kogumise
määrade piirkondlikud erinevused
PUUDUVAD Protsendi punktid
28,4 20 4. kv 2024
Kolme kõige paremaid tulemusi saavutanud piirkonna (Veneto, Trentino, Sardegna) keskmise ja ISPRA 2020. aasta aruandes esitatud halvimate tulemustega piirkondade
188
Järjekorra- number
Seotud meede (reform või investeering)
Eesmärk/siht Nimetus Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
olemasolevate rajatiste moderniseerimine
(Basilicata, Calabria ja Sicilia) keskmise jäätmekogumise erinevus väheneb 20 protsendipunktini. Eesmärgi rahuldavaks täitmiseks on vaja suurendada ka ISPRA 2020. aasta aruandes esitatud jäätmete liigiti kogumise riigi keskmist ja kolme kõige paremaid tulemusi saavutanud piirkonna (Veneto, Trentino, Sardegna) keskmist võrreldes ISPRA 2020. aasta aruandes esitatud andmetega.
M2C1– 16quater
Investeering 1.1 – Uute jäätmekäitlusrajatiste
rakendamine ning olemasolevate rajatiste
ajakohastamine ja ringmajanduse juhtprojektid
Siht Lõpetatud projektid PUUDUVAD Number 0 584 2. kv 2026 Ellu on viidud vähemalt 584 projekti, millest vähemalt 90 on seotud jäätmejaamade projektidega.
M2C1–10
Investeering 2.1: Põllumajandusliku
toidutööstuse, kalanduse ja vesiviljeluse, metsanduse,
lillekasvatuse ja taimekoolide sektori
logistikakava
Siht
Materiaalsed ja immateriaalsed investeeringud
põllumajandusliku toidutööstuse, kalanduse ja vesiviljeluse, metsanduse,
lillekasvatuse ja taimekoolide sektorisse.
PUUDUVAD Number 0 72 2. kv 2026
Põllumajandusliku toidutööstuse, kalanduse ja vesiviljeluse, metsanduse, lillekasvatuse ja taimekasvatuse sektoris on tehtud vähemalt 72 materiaalset ja immateriaalset investeeringut.
M2C1–18 Investeering 3.1:
Rohelised saared Eesmärk
Direktori käskkirja jõustumine
Määruse säte, mis viitab seaduse jõustumisele
PUUDUVAD PUUDUVAD PUUDUVAD 3. kv 2022 Direktori käskkirjaga kinnitatakse avaliku teadaande tulemustega seotud projektide paremusjärjestus. Valikumenetlus hõlmab
189
Järjekorra- number
Seotud meede (reform või investeering)
Eesmärk/siht Nimetus Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
järgmist: a) rahastamiskõlblikkuse kriteeriumid, millega tagatakse, et valitud projektid vastavad põhimõtte „ei kahjusta oluliselt“ tehnilistele suunistele (2021/C58/01), kasutades välistamisnimekirja ning nõuet järgida asjakohaseid ELi ja riiklikke keskkonnaalaseid õigusakte. b) Kohustus, et investeeringu kliimapanus vastavalt määruse (EL) 2021/241 VI lisas esitatud metoodikale moodustab vähemalt 37 % taaste- ja vastupidavusrahastust toetatavate investeeringute kogukuludest. c) kohustus esitada aruanne meetme rakendamise kohta kava kehtivusaja keskel ja kava lõppedes. Võimalikud sekkumisvaldkonnad on järgmised: • agrometsanduspärandi integreeritud ja sertifitseeritud haldamine („ka süsinikdioksiidi kogumisest saadud arvestusühikute vahetamise, bioloogilise mitmekesisuse haldamise ja puidu tarneahela sertifitseerimise kaudu“);
• veevarude integreeritud ja sertifitseeritud majandamine;
• energia tootmine kohalikest taastuvatest energiaallikatest, nagu mikrohüdroelektrijaamad, biomass, biogaas, tuuleenergia, koostootmine ja biometaan;
• säästva turismi arendamine
190
Järjekorra- number
Seotud meede (reform või investeering)
Eesmärk/siht Nimetus Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
(„võimaldab väärtustada kohalikke tooteid“);
• moodsa mägede hoonefondi ja taristu ehitamine ja säästev majandamine;
• energiatõhusus ning jaamade ja võrkude arukas integreerimine;
• tootmistegevuse kestlik areng (jäätmevaba tootmine);
• liikuvusteenuste integreerimine;
• säästva põllumajandusmudeli väljatöötamine („mis on energiasõltumatu ka taastuvatest energiaallikatest energia tootmise ja kasutamise kaudu elektri-, soojus- ja transpordisektoris“).
Biometaan peab vastama kestlikkuse ja kasvuhoonegaaside heite vähendamise kriteeriumidele, mis on sätestatud artiklites 29–31, ning toidu- ja söödapõhiseid biokütuseid käsitlevatele normidele, mis on sätestatud taastuvenergia direktiivi (EL) 2018/2001 (REDII) artiklis 26 ning sellega seotud rakendusaktides ja delegeeritud õigusaktides, et meede vastaks olulise kahju ärahoidmise põhimõttele ja määruse (EL) 2021/241 VI lisa joonealuse märkuse 8 asjakohastele nõuetele.
M2C1–19 Investeering 3.1:
Rohelised saared Siht
Haldusakt(id) sekkumiseks väikesaartel
PUUDUVAD Projektide arv 0 57 2. kv 2026
Antakse välja haldusakt(id), millega kinnitatakse, et 19 väikesaarel viiakse iga 57 projekti puhul läbi sekkumine, mis hõlmab vähemalt ühte projekti saare kohta. Abikõlblikud projektid on: • energiatõhusus;
191
Järjekorra- number
Seotud meede (reform või investeering)
Eesmärk/siht Nimetus Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
• kollektiivse liikuvuse teenuste ja laadimistaristute loomine ja/või ajakohastamine; elektri jõul töötavad bussid ja paadid; varjualused ühistransporditeenuste jaoks; autode ühiskasutus, jalgrataste ühiskasutus, motorollerite ühiskasutus;
• jalgrattateede ehitamine ja/või kohandamine, varjupaigaalade ehitamine;
• liigiti kogumine koos kogumissüsteemide täiustamisega;
• ökoloogiliste saarte ehitamine/moderniseerimine koos sellega seotud korduskasutuskeskusega;
• magestamissüsteemid;
• veekasutuse tõhusus, mis võib hõlmata muu hulgas uute joogiveepuhastussüsteemide ehitamist;
• taastuvenergiajaamad elektrienergia tootmiseks, mis võivad muu hulgas hõlmata fotogalvaanilist, avamere tuuleenergiat või mere taastuvenergiat (nt laine- või tõusu-mõõnaenergiat);
• energiatõhususe meetmed, mille eesmärk on vähendada elektrinõudlust;
• elektrivõrgu ja sellega seotud taristu projektid, mis võivad muu hulgas hõlmata salvestusseadmeid, elektrisüsteemi integreerimist saare
192
Järjekorra- number
Seotud meede (reform või investeering)
Eesmärk/siht Nimetus Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
veesüsteemiga, arukaid võrke, uuenduslikke energiajuhtimis- või seiresüsteeme.
M2C1–20 Investeering 3.2:
Rohelised kogukonnad Eesmärk
(Kõigi) riigihankelepingute sõlmimine roheliste
kogukondade valimiseks
Teade (kõigi) riigihankelepingute
sõlmimise kohta roheliste
kogukondade valimiseks
PUUDUVAD PUUDUVAD PUUDUVAD 3. kv 2022
Teade toetuste andmise menetluse kohta, mis peaks sisaldama rahastamiskõlblikkuse kriteeriume, millega tagatakse, et valitud projektid vastavad põhimõtte „ei kahjusta oluliselt“ tehnilistele suunistele (2021/C58/01), kasutades välistamisnimekirja ning nõuet järgida asjakohaseid ELi ja riiklikke keskkonnaalaseid õigusakte.
M2C1–21 Investeering 3.2:
Rohelised kogukonnad Siht
Haldustõendid projektide lõpuleviimise
kohta rohelistes kogukondades
PUUDUVAD Projektide arv 0 410 2. kv 2026
Haldustõendid, mis kinnitavad, et rohelistes kogukondades on ellu viidud vähemalt 410 projekti. Projektid peavad olema vähemalt ühes järgmistest valdkondadest: • agrometsanduspärandi
integreeritud ja sertifitseeritud haldamine;
• veevarude integreeritud ja sertifitseeritud majandamine;
• energia tootmine kohalikest taastuvatest energiaallikatest, nagu mikrohüdroelektrijaamad, biomass, biogaas, tuuleenergia, koostootmine ja biometaan;
• säästva turismi arendamine;
• moodsa mägede hoonefondi ja taristu ehitamine ja säästev majandamine;
• energiatõhusus ning jaamade ja
193
Järjekorra- number
Seotud meede (reform või investeering)
Eesmärk/siht Nimetus Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
võrkude arukas integreerimine;
• tootmistegevuse kestlik areng (jäätmevaba tootmine);
• liikuvusteenuste integreerimine;
• jätkusuutliku põllumajandusmudeli väljatöötamine.
M2C1–22
Investeering 3.4: Fondo Contratti di Filiera (FCF), et toetada
tarneahelalepinguid põllumajandusliku
toidutööstuse, kalanduse ja vesiviljeluse, metsanduse,
lillekasvatuse ja taimekoolide sektoris
Eesmärk Rakenduskokkulepe. Rakenduskokkuleppe
jõustumine PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2024 Rakenduskokkuleppe jõustumine.
M2C1–23
Investeering 3.4: Fondo Contratti di Filiera (FCF), et toetada
tarneahelalepinguid põllumajandusliku
toidutööstuse, kalanduse ja vesiviljeluse, metsanduse,
lillekasvatuse ja taimekoolide sektoris
Eesmärk
ISMEA-le ülekantud vahendid ja
rakenduslepingu muutmine
Üleandmise tõend ja rakenduslepingu
muutmine PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2025
Itaalia kannab ISMEA-le rahastu jaoks üle täiendavad 2 000 000 000,00 eurot. Rakenduslepingu kogu rahastamis- ja haldustasu muutmine.
M2C1–24
Investeering 3.4: Fondo Contratti di Filiera (FCF), et toetada
tarneahelalepinguid
Siht Õiguslikud kokkulepped
lõplike abisaajatega PUUDUVAD Protsent 0 100 2. kv 2026
ISMEA on sõlminud lõplike toetusesaajatega seaduslikud rahastamislepingud summas, mis on vajalik, et kasutada 100 % taaste- ja vastupidavusrahastu investeeringust
194
Järjekorra- number
Seotud meede (reform või investeering)
Eesmärk/siht Nimetus Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
põllumajandusliku toidutööstuse, kalanduse ja vesiviljeluse, metsanduse,
lillekasvatuse ja taimekoolide sektoris
rahastusse (võttes arvesse haldustasusid). ISMEA koostab VI lisas esitatud metoodikat kasutades aruande, milles kirjeldatakse üksikasjalikult, kui suur osa sellest rahastamisest aitab kaasa kliimaeesmärkide saavutamisele.
M2C1–25
Investeering 3.4: Fondo Contratti di Filiera (FCF), et toetada
tarneahelalepinguid põllumajandusliku
toidutööstuse, kalanduse ja vesiviljeluse, metsanduse,
lillekasvatuse ja taimekoolide sektoris
Eesmärk Ministeerium on
vahendite kogusumma ümber paigutanud
Üleviimistunnistus PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2024 Itaalia kannab ISMEA-le rahastu jaoks üle 1 960 000 000,00 eurot.
M2C1–26 Investeering 4: Põllumajandus-
päikesepargi rajatis Eesmärk Rakenduskokkulepe.
Rakenduskokkuleppe jõustumine
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2025 Rakenduskokkuleppe jõustumine.
M2C1–27 Investeering 4: Põllumajandus-
päikesepargi rajatis Eesmärk
Lõplike abisaajatega sõlmitud juriidilised
lepingud ja investeeringute lõpuleviimine
Allkirjastatud õiguslikud
kokkulepped ja üleandmise tõend
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2026
GSE peab olema sõlminud lõplike toetusesaajatega seaduslikud toetuslepingud summas, mis on vajalik, et kasutada 100 % taaste- ja vastupidavusrahastu investeeringust kavasse (võttes arvesse haldustasusid). Vähemalt 633 000 000 sellest rahastamisest aitab kaasa kliimaeesmärkide saavutamisele, kasutades taaste- ja vastupidavusrahastu määruse VI lisas esitatud metoodikat.
195
Järjekorra- number
Seotud meede (reform või investeering)
Eesmärk/siht Nimetus Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
Itaalia kannab GSEsse rahastu jaoks üle 789 000 000 eurot.
196
E. LÄHETUS 2 KOMPONENT 2: Energiasüsteemi ümberkujundamine ja
kestlik liikuvus
See Itaalia taaste- ja vastupidavuskava komponent hõlmab investeeringuid ja reforme energiasüsteemi
ümberkujundamiseks. See hõlmab reforme, et hõlbustada taastuvenergiaprojektidele loa andmist.
Komponent hõlmab investeeringuid taastuvate energiaallikate tarneahelasse, vesinikuenergiasse,
biometaani rajatistesse ja arukatesse võrkudesse. Neid reforme ja investeeringuid täiendavad
reformid, mille eesmärk on suurendada konkurentsi elektriturul ettevõtluskeskkonna reformi
komponendi raames.
See komponent hõlmab ka investeeringuid ja reforme kestliku liikuvuse valdkonnas. See hõlmab
reforme, et hõlbustada säästva liikuvuse projektidele loa andmist. Komponent sisaldab
investeeringuid jalgrattateede ja metroo/trammi/bussi kiirtransiiditaristu ehitamiseks ning heiteta
busside, veeremi, tuletõrje- ja lennujaamasõidukite hankimiseks. Neid reforme ja investeeringuid
täiendavad reformid, mille eesmärk on kaotada elektrisõidukite reguleeritud hinnad ja suurendada
konkurentsi laadimispunktide kontsessioonide, piirkondlike raudteede ja kohaliku ühistranspordi
valdkonnas ettevõtluskeskkonna reformi komponendi raames.
Selle komponendi raames tehtavad investeeringud ja reformid aitavad täita 2020. ja 2019. aastal
Itaaliale esitatud riigipõhiseid soovitusi vajaduse kohta „keskenduda investeeringute tegemisel rohe-
ja digipöördele, eelkõige [...] puhtale ja tõhusale energiatootmisele ja -kasutusele [...] säästvale
ühistranspordile“ (riigipõhine soovitus 3, 2020) ning „keskenduda investeeringutega seotud
majanduspoliitikale [...] ja taristu kvaliteedile, võttes arvesse ka piirkondlikke erinevusi“ (riigipõhine
soovitus 3, 2019).
Komponendiga toetatakse Itaaliale riikliku energia- ja kliimakava rakendamise kohta antud suuniseid
(SWD(2020) 911 final), milles kutsuti Itaaliat üles edendama, uuendama ja ajakohastama
olemasolevaid taastuvenergiarajatisi, eelkõige olemasolevaid tuuleelektrijaamu, ning uurima
uuenduslikke avamereenergia võimalusi kogu Vahemere piirkonnas.
Lähtudes meetmete kirjeldusest taaste- ja vastupidavuskavas ja võttes arvesse põhimõtte „Ei kahjusta
oluliselt“ tehniliste suuniste (2021/C58/01) kohaseid leevendavaid samme, mis kavas on sätestatud,
võib eeldada, et ükski selle komponendi meede ei kahjusta määruse (EL) 2020/852 artikli 17
tähenduses oluliselt keskkonnaeesmärke.
E.1. Tagastamatu rahalise toetusega seotud reformide ja investeeringute
kirjeldus
Reform 1 – maismaal ja avamerel asuvatele taastuvenergiajaamadele loa andmise menetluste
lihtsustamine ning uus õigusraamistik taastuvatest energiaallikatest tootmise säilitamiseks ning
praeguste toetuskavade ajaline pikendamine ja rahastamiskõlblikkuse pikendamine
Reform koosneb järgmistest osadest:
- taastuvaid energiaallikaid kasutavate käitiste suhtes kohaldatavate lihtsustamismeetmete
jõustumine ning olemasolevate käitiste ajakohastamine ja uuendamine kooskõlas 17. juuli 2020.
aasta dekreetseaduse nr 76 (edaspidi „lihtsustamisdekreet“) sätetega;
- piirkondade ja teiste asjaomaste riigiasutustega kokku lepitud dekreedi vastuvõtmine, mille
eesmärk on määratleda kriteeriumid, mille alusel määrata kindlaks alad, mis sobivad ja ei sobi
taastuvenergiajaamade rajamiseks täiendava taastuvenergia tootmisvõimsusega vähemalt 73 GW
kooskõlas PNIECi ajakohastatud versiooniga, et saavutada taastuvate energiaallikate arendamise
eesmärgid;
197
- taastuvate energiaallikate toetusmehhanismi lõpuleviimine ka täiendavate mitteküpsete või kõrge
käitamiskuluga tehnoloogiate puhul ning nn RES1 mehhanismi enampakkumisperioodi
pikendamine, säilitades samal ajal konkurentsipõhise juurdepääsu põhimõtte;
- sätted, millega edendatakse investeeringuid salvestussüsteemidesse, seadusandlikus dekreedis,
millega võetakse üle direktiiv (EL) 2019/944 elektrienergia siseturu ühiste normide kohta.
Reform 2 – Uued õigusaktid taastuvatest energiaallikatest toodetud gaasi tootmise ja tarbimise
edendamiseks
See reform seisneb puhta biometaani toetuse suurendamises, võttes vastu õigusaktid, et suurendada
rahastamiskõlblike biometaani projektide ulatust ja pikendada toetuste kättesaadavuse perioodi.
Biometaan peab vastama taastuvenergia direktiivis (EL) 2018/2001 (REDII) sätestatud
kriteeriumidele, et meede vastaks põhimõttele „ei kahjusta oluliselt“ ja määruse (EL) 2021/241 VI lisa
joonealuse märkuse 8 asjakohastele nõuetele.
Reform 3 – halduskorra lihtsustamine ja vesiniku kasutuselevõttu takistavate regulatiivsete
tõkete vähendamine
See reform seisneb õigusraamistiku jõustumises, et edendada vesinikku kui taastuvat energiaallikat.
See õigusraamistik sisaldab järgmist:
- Tehnilised ohutuseeskirjad vesiniku tootmise, transpordi (tehnilised ja regulatiivsed kriteeriumid
vesiniku lisamiseks maagaasivõrku), hoiustamise ja kasutamise kohta;
- Loa andmise kiirmenetlus koos ühtse kontaktpunkti menetlusega, et saada luba väikese
vesinikutootmisjaama ehitamiseks ja käitamiseks (elektrolüüsiseadmete puhul võimsusega alla 1–
5 MW; hoiustamise künnis määratakse kindlaks eespool nimetatud vesiniku tehnilistes
ohutuseeskirjades).
- Vesinikutootmisjaamade võrguteenustes osalemise reguleerimine. Energeetikasektorit
reguleerivale asutusele (ARERA) tehakse ülesandeks võtta pärast sidusrühmadega konsulteerimist
vastu konkreetne reguleeriv meede.
- Taastuvallikatest toodetud vesiniku päritolutagatiste süsteem, et anda tarbijatele hinnasignaale.
- Menetlused ja/või kriteeriumid kiirteede ääres asuvate valitud tankimisalade
kindlaksmääramiseks, et optimeerida tanklate asukohta ja luua veoautodele H2 koridorid alates
Põhja-Itaalia piirkondadest kuni Po jõe oruni ja logistikakeskusteni ning poolsaarel asuvate
peamiste kiirteedeni.
- Riikliku põhivõrguettevõtja kümneaastase arengukava kooskõlastamine teiste Euroopa
põhivõrguettevõtjate kavadega, mille eesmärk on töötada välja ühised standardid vesiniku
transportimiseks olemasolevate gaasijuhtmete või spetsiaalsete torujuhtmete kaudu.
Reform 4 – Vesiniku konkurentsivõime edendamise meetmed
Reform seisneb maksumeetmete vastuvõtmises, et stimuleerida vesiniku tootmist ja/või kasutamist
kooskõlas maksustamist käsitlevate ELi õigusnormidega, ning II taastuvenergia direktiivi
ülevõtmises. Selle meetmega toetatakse elektrolüüsil põhinevat vesinikutootmist, kasutades direktiivis
(EL) 2018/2001 (taastuvenergia direktiiv) määratletud taastuvaid energiaallikaid, või võrguelektrit.
Reform 5 – arukam projektide hindamise kord kohalike ühistranspordisüsteemide sektoris, kus
on paigaldised, ja kiire ühistranspordi sektoris
Reformi käigus võetakse vastu õigusakt, millega määratakse selgelt kindlaks vastutus kohaliku
ühistranspordi projektide heakskiitmisel, ning lihtsustatakse maksemenetlust.
198
Investeering 2.1 – Arukate võrkude tugevdamine
Selle investeeringu eesmärk on elektrijaotusvõrgu taristu ajakohastamine ja digitaliseerimine.
Investeering seisneb toetuste andmises võrguettevõtjatele, et rahastada sekkumisi, mis suurendavad
võrgu vastuvõtuvõimsust ja maksimaalset elektrit, mida võrk kodumajapidamistele tarbimiseks tarnib.
Investeering 2.2 – Sekkumised elektrivõrgu vastupidavuse suurendamiseks
Selle investeeringu eesmärk on suurendada ülekande- ja jaotusvõrgu vastupidavust äärmuslikele
ilmastikunähtustele, vähendades seega elektrivarustuse pikaajaliste katkestuste tõenäosust.
Investeering seisneb toetuste andmises võrguettevõtjatele sekkumisteks, mis vastavad võrgu
suuremale vastupidavusele.
Investeering 4.1 – Investeeringud pehmesse liikuvusse (riiklik jalgrattateede kava)
Selle investeeringu eesmärk on ehitada jalgrattateid, et hõlbustada pendelrännet suurlinnapiirkondade
või ülikoole võõrustavate linnade asukohtade vahel, ning turismi jalgrattateid peamiselt
maapiirkondades. See investeering hõlmab vähemalt 1 261 km jalgrattateede ehitamist
suurlinnapiirkondadesse ja turismi jalgrattateede ehitamist.
Investeering 4.3 – Laadimistaristu paigaldamine
Selle investeeringu eesmärk on toetada transpordisektori CO2 heite vähendamist. Selle
investeeringuga rahastatakse laadimispunktide rajamist kiirteedele või linnapiirkondadesse.
Investeering 4.4.1 – Piirkondliku ühistranspordi heiteta bussipargi tugevdamine
Investeeringu eesmärk on vähendada kasvuhoonegaaside heidet ja ajakohastada ühistranspordi
bussiparki. See investeering hõlmab heiteta busside hankimist ja laadimisjaamade paigaldamist.
Investeering 4.4.3 – Riikliku tuletõrjeteenistuse laevastiku uuendamine
Investeeringu eesmärk on vähendada kasvuhoonegaaside heidet ja ajakohastada tuletõrjeautoparki.
See investeering hõlmab vähemalt 3 800 sõiduki hankimist riikliku tuletõrjebrigaadi jaoks.
Investeering 4.5 – Erasõidukite ja väikeste tarbesõidukite pargi elektrisõidukitega uuendamise
programm
Selle investeeringu eesmärk on vähendada maanteetranspordist tulenevat kasvuhoonegaaside ja
õhusaastet linnapiirkondades. See investeering hõlmab heiteta sõidukite ostmist ja diiselsõidukite
lammutamist.
Investeering 5.4 – omakapitalisüst rohepöörde fondi (GTF), mida haldab CDP Venture Capital
SGR
Meetme eesmärk on toetada Itaalia majanduse kasvupotentsiaali, stimuleerides erainvesteeringuid,
parandades rohepöördes osalevate idufirmade juurdepääsu rahastamisele ja arendades
riskikapitaliturgu selles sektoris. Meede seisneb 250 000 000 euro suuruses omakapitalisüstis
rohepöörde fondi, mida haldab CDP Venture Capital SGR.
CDP Venture Capital SGR võtab vastu omakapitali kasutamise investeerimispoliitika.
Investeerimispoliitika sisaldab finantstoode(t)e kirjeldust koos rahastamiskõlblike lõplike abisaajate
eeldatava liigiga, mida omakapitalist eeldatavasti toetatakse, sealhulgas rakendamise eeldatavat 15-
aastast ajakava ja maksimaalselt 13 % suurust haldustasu.31 GTF tegutseb omakapitali,
31 Eelkõige ei hõlma 13 % ülempiir teenitud huvi, GTFiga seotud tulemustasusid ega kõiki kolmandate isikute
vahenditega seotud kulusid ja haldustasusid.
199
kvaasiomakapitali, võla või kvaasivõla otsese või kaudse toetamise kaudu32. CDP Venture Capital
SGR võtab omakapitali kasutamiseks vastu auditi- ja kontrollisüsteemi, mida on kirjeldatud suunistes
„Linee Guida per le attività di rendicontazione e controllo dei Fondi DTF e GTF“.
Investeerimispoliitikas nõutakse, et finantstoode (-tooted), mida omakapitaliga toetatakse, vastaks
olulise kahju ärahoidmise põhimõttele, nagu on sätestatud põhimõtte „ei kahjusta oluliselt“ tehnilistes
suunistes (2021/C58/01). Eelkõige idufirmade üldise toetamise korral jäetakse investeerimispoliitikast
välja äriühingud, kes keskenduvad peamiselt33 järgmistele sektoritele: i) fossiilkütustel põhinev
energiatootmine ja sellega seotud tegevus34; ii) energiamahukad ja/või suure CO2-heitega
tööstusharud35; iii) saastavate sõidukite tootmine, rentimine või müük36; iv) jäätmete kogumine,
töötlemine ja37 kõrvaldamine, v) tuumkütuse töötlemine, tuumaenergia tootmine. Lisaks nõutakse
investeerimispoliitikas vastavust asjakohastele ELi ja riiklikele keskkonnaalastele õigusaktidele.
Investeering 5.5. Roheline maksukrediit
Selle investeeringu eesmärk on toetada ettevõtete üleminekut energiatõhusatele, säästvatele ja
taastuvenergial põhinevatele tootmismudelitele. Investeering seisneb ettevõtjatele maksukrediidi
andmises, mis vastab ajavahemikul 1. jaanuarist 2024 kuni 31. detsembrini 2025 kantud
rahastamiskõlblikele kuludele, nimelt digivarale (4,0 materiaalset kapitalikaupa, 4,0 immateriaalset
kapitalikaupa38) ja töötajate koolitamisele rohepöördeks vajalike oskuste valdkonnas.
32 Eelkõige otseinvesteeringute puhul tegutseb GTF omakapitali või kvaasiomakapitali toetuse andmise kaudu;
kaudsete investeeringute korral rahastab GTF kolmandate isikute fonde, mis toimivad, pakkudes vähemalt ühte
järgmistest: omakapital või kvaasiomakapital või võlainstrumendid või kvaasivõlainstrumendid.
33 Lõplikul abisaajal on „oluline fookus“ sektorile või äritegevusele, kui seda sektorit või tegevust peetakse
lõpliku abisaaja äritegevuse oluliseks osaks vastavalt seoses lõpliku abisaaja brutotulu, kasumi või
kliendibaasiga. Piiratud sektorist või tegevusest saadav brutotulu ei tohi mingil juhul ületada 50 % brutotulust.
34 Välja arvatud a) varad ja tegevused maagaasi kasutavas elektri- ja/või soojusenergia tootmises ning sellega
seotud ülekande- ja jaotustaristus, mis vastavad põhimõtte „ei kahjusta oluliselt“ tehniliste suuniste
(2021/C58/01) III lisas sätestatud tingimustele, ning b) alapunktis ii osutatud tegevused ja varad, mille puhul
fossiilkütuste kasutamine on fossiilkütustevabale käitamisele õigeaegseks üleminekuks ajutine ja tehniliselt
vältimatu.
35 Sealhulgas ELi heitkogustega kauplemise süsteemi (HKS) alla kuuluvad tegevused ja varad, millega
saavutatakse prognoositud kasvuhoonegaaside heide, mis ei ole asjaomastest võrdlusalustest väiksem. Kui
toetatava tegevusega saavutatakse prognoositud kasvuhoonegaaside heide, mis ei ole asjaomastest
võrdlusalustest oluliselt väiksem, esitatakse selgitus selle kohta, miks see ei ole võimalik. Saastekvootide tasuta
eraldamise võrdlusalused saastekvootidega kauplemise süsteemi kohaldamisalasse kuuluvate tegevuste jaoks on
sätestatud komisjoni rakendusmääruses (EL) 2021/447.
36 Saastavad sõidukid on määratletud heiteta sõidukitena.
37 Seda erandit ei kohaldata meetmete suhtes, mida võetakse tehastes, mis on ette nähtud üksnes
ringlussevõetamatute ohtlike jäätmete töötlemiseks, ja olemasolevates tehastes, kui käesoleva meetme kohaste
meetmete eesmärk on suurendada energiatõhusust, koguda heitgaase ladustamiseks või kasutamiseks või
taaskasutada põletustuhast saadud materjale, tingimusel et sellised käesoleva meetme kohased meetmed ei
suurenda tehaste jäätmetöötlusvõimsust ega pikenda nende kasutusiga; tõendid selle kohta tuleb esitada iga
jaama kohta eraldi. 38 Eelkõige viidatakse kavas 11. detsembri 2016. aasta seaduse nr 232 A ja B lisale.
200
E.2. Tagastamatu rahalise toetuse eesmärgid, sihid, näitajad ning seire ja rakendamise ajakava
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
M2C2–6
Reform 1
„Taastuvenergia
maismaa- ja
avamerejaamadele
loa andmise
menetluste
lihtsustamine ning
uus õigusraamistik
taastuvatest
energiaallikatest
tootmise
säilitamiseks ning
praeguste
toetuskavade
ajaline pikendamine
ja
rahastamiskõlblikku
se pikendamine“
Eesmärk
Maismaa ja
avamere
taastuvenergia
rajatiste
ehitamiseks loa
andmise
menetluste
lihtsustamise
õigusraamistiku
jõustumine
Seaduse
jõustumisele
viitav
õigusnorm
PUUDUVAD PUUDUV
AD PUUDUVAD 1. kv 2024
Õigusraamistik sisaldab järgmisi eesmärke:
● taastuvaid energiaallikaid kasutavate käitiste suhtes kohaldatavate lihtsustamismeetmete jõustumine ning olemasolevate käitiste ajakohastamine ja uuendamine kooskõlas 17. juuli 2020. aasta dekreetseaduse nr 76 (edaspidi „lihtsustamisdekreet“) sätetega;
● piirkondade ja teiste asjaomaste riigiasutustega kokku lepitud dekreedi vastuvõtmine, mille eesmärk on määratleda kriteeriumid, mille alusel määrata kindlaks alad, mis sobivad ja ei sobi taastuvenergiajaamade rajamiseks täiendava taastuvenergia tootmisvõimsusega vähemalt 73 GW kooskõlas PNIECi ajakohastatud versiooniga, et saavutada taastuvate energiaallikate arendamise eesmärgid;
● taastuvate energiaallikate toetusmehhanismi lõpuleviimine ka täiendavate mitteküpsete või kõrge käitamiskuluga tehnoloogiate puhul ning nn RES1 mehhanismi enampakkumisperioodi pikendamine, säilitades samal ajal konkurentsipõhise juurdepääsu põhimõtte;
● sätted, millega edendatakse investeeringuid salvestussüsteemidesse,
201
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
seadusandlikus dekreedis, millega võetakse üle direktiiv (EL) 2019/944 elektrienergia siseturu ühiste normide kohta.
M2C2–7
Reform 2 – Uued
õigusaktid
taastuvatest
energiaallikatest
toodetud gaasi
tootmise ja
tarbimise
edendamiseks
Eesmärk
Jõustub
seadusandlik
dekreet, millega
edendatakse
taastuvatest
energiaallikates
t toodetud gaasi
kasutamist
biometaani
kasutamiseks
transpordi-,
tööstus- ja
elamusektoris,
ning
rakendusmääru
s, milles
sätestatakse
selle
kasutamise
tingimused ja
kriteeriumid
ning uus
stiimulite
Seaduse
jõustumisele
viitav
õigusnorm
PUUDUVAD PUUDUV
AD PUUDUVAD 4. kv 2021
Seadusandlik dekreet sisaldab eelkõige
järgmist:
Ühe seadusandliku muudatusega
lihtsustatakse lubade andmise menetlust ja
muudetakse praegust toetuste andmise
mehhanismi, et i) laiendada abikõlblikkuse
ulatust ja ii) pikendada toetuste kättesaadavuse
perioodi ning iii) näha ette
soodustariifimehhanism ja taastuvatest
energiaallikatest toodetud gaasi päritolutagatis.
II taastuvenergia direktiivi ülevõtmine
seadusandliku dekreediga
Üldist koordineerimist teostaks Ministero della
Transizione Ecologica (MiTE), keda toetaksid
teised nõuandva funktsiooniga asutused:
Põllumajandusministeerium (MIPAAF),
majandus- ja rahandusministeerium (MEF) ning
Gestore Servizi Energetici.
202
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
süsteem.
M2C2–8
Investeering 2.1 –
Arukate võrkude
tugevdamine
Eesmärk
(Kõikide)
riigihankeleping
ute sõlmimine
võrgu
läbilaskevõime
suurendamisek
s
(Kõikide)
riigihankeleping
ute sõlmimisest
teatamine
PUUDUVAD PUUDUV
AD PUUDUVAD 4. kv 2022
Teade (kõigi) riigihankelepingute sõlmimise
kohta, mille eesmärk on suurendada võrgu
võimsust taastuvenergia jaotamiseks ja
energiatarbimise elektrifitseerimiseks
M2C2–10
Investeering 2.1 –
Arukate võrkude
tugevdamine
Eesmärk
Võrgu
vastuvõtuvõims
use
suurendamine
ja maksimaalne
tarbitav
võimsus
Läbiviidud
sekkumised PUUDUVAD
PUUDUV
AD PUUDUVAD 2. kv 2026
Sõltumatu inseneri aruanne (aruanded), mis
tõendab (kinnitavad), et on tehtud sekkumisi,
mille tulemuseks on:
–võrgu vastuvõtuvõimsuse suurendamine
vähemalt 4 000 MW võrra;
–võrgust tarbimiseks tarnitava
maksimumvõimsuse suurendamine mitme
tarnepunkti puhul, mis vastavad vähemalt
1 500 000 elanikule.
M2C2–12
Investeering 2.2 –
Sekkumised
elektrivõrgu
vastupidavuse
suurendamiseks
Eesmärk
Toetuse
andmine
projektidele,
mille eesmärk
on suurendada
elektrisüsteemi
võrgu
Teade projektile
toetuse
andmise kohta
PUUDUVAD PUUDUV
AD PUUDUVAD 4. kv 2022
Toetuse andmine projektidele, mille eesmärk
on suurendada elektrisüsteemi võrgu
vastupidavust vähemalt 4 000 km võrra, et
vähendada äärmuslikest ilmastikutingimustest
tulenevate energiakatkestuste sagedust ja
kestust.
203
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
vastupidavust
M2C2–13
Investeering 2.2 –
Sekkumised
elektrivõrgu
vastupidavuse
suurendamiseks
Eesmärk
Suurendada
elektrivõrgu
vastupidavust
Läbiviidud
sekkumised PUUDUVAD
PUUDUV
AD PUUDUVAD 2. kv 2026
Sõltumatu inseneri aruanne (aruanded), milles
tõendatakse, et on tehtud sekkumisi, mis
vastavad elektrivõrgu vastupidavuse
suurenemisele vähemalt 4 000 km võrra.
M2C2–14
Investeering 3.3 –
Vesinikukatsed
maanteetranspordis
Eesmärk
(Kõigi)
riigihankeleping
ute sõlmimine
vesinikul
põhinevate
laadimisjaamad
e arendamiseks
Teade (kõigi)
riigihankeleping
ute sõlmimise
kohta vähemalt
40 vesinikul
põhineva
laadimisjaama
arendamiseks
PUUDUVAD PUUDUV
AD PUUDUVAD 1. kv 2023
Teade (kõigi) riigihankelepingute sõlmimise
kohta vähemalt 40 vesinikul põhineva
laadimisjaama arendamiseks kooskõlas
direktiiviga 2014/94/EL alternatiivkütuste taristu
kohta.
M2C2–16
Investeering 3.4
Vesinikukatsed
raudteetranspordi
valdkonnas
Eesmärk
Vahendite
eraldamine
vesiniku
katsetamiseks
raudteetranspor
di valdkonnas
Vahendite
eraldamisest
teatamine
PUUDUVAD PUUDUV
AD PUUDUVAD 1. kv 2023
Vahendite eraldamine vastavalt menetlustele ja
kriteeriumidele, mis on kehtestatud kümne
vesinikutankla ehitamiseks kuuel raudteeliinil.
M2C2–18
Investeering 3.5 –
Vesinikualane
teadus- ja
arendustegevus
Eesmärk
Kõigi riiklike
teadus- ja
arenduslepingut
e sõlmimine
Teade
vesinikualase
teadus- ja
arendustegevu
PUUDUVAD PUUDUV
AD PUUDUVAD 2. kv 2022
Teatis teadus- ja arenduslepingute sõlmimise
kohta, mille eesmärk on parandada teadmisi
vesinikuvektori rakendamise kohta tootmis-,
hoiustamis- ja jaotusetapis. Lepingud peavad
hõlmama vähemalt nelja teadusuuringute
204
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
vesinikualaste
teadusprojektid
ega
se lepingute
sõlmimise
kohta
mõõdet:
a) Rohelise ja saastevaba vesiniku tootmine
b) Vesiniku hoiustamise, transpordi ning
derivaatideks ja e-kütusteks muundamise
uuenduslikud tehnoloogiad
c) Paiksete ja liikuvusrakenduste
kütuseelemendid
d) Integreeritud arukad juhtimissüsteemid, et
suurendada arukate vesinikupõhiste taristute
vastupidavust ja usaldusväärsust
Selle meetmega toetatakse vesiniku tootmist
elektrolüüsi teel, kasutades direktiivis (EL)
2018/2001 (taastuvenergia direktiiv)
määratletud taastuvaid energiaallikaid või
võrguelektrit, või vesinikuga seotud tegevusi,
mis vastavad vesiniku olelusringi jooksul
tekkiva kasvuhoonegaaside heite vähendamise
nõudele 73,4 %, mille tulemusel on
kasvuhoonegaaside heide olelusringi jooksul
väiksem kui 3 tCO2e/tH2, ja vesinikupõhiste
sünteetiliste kütuste puhul 70 % võrreldes
fossiilkütusega, mille võrdlusväärtus on 94 g
CO2e/MJ, analoogselt direktiivi (EL) 2018/2001
artikli 25 lõikes 2 ja V lisas sätestatud
lähenemisviisiga.
205
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
M2C2–20
Reform 3
„Halduskorra
lihtsustamine ja
vesiniku
kasutuselevõttu
takistavate
regulatiivsete tõkete
vähendamine“
Eesmärk
Vajalike
seadusandlike
meetmete
jõustumine
Seaduse
jõustumisele
viitav
õigusnorm
PUUDUVAD PUUDUV
AD PUUDUVAD 1. kv 2023
Vajalike seadusandlike meetmetega nähakse
ette i) vesiniku tootmise, transpordi ja
hoiustamisega seotud turvasätted, ii)
saastevaba vesiniku tootmiseks väikeste
struktuuride ehitamise menetluste lihtsustamine
ja iii) vesinikul põhinevate laadimisjaamade
ehitamise tingimustega seotud meetmed.
Selle meetmega toetatakse üksnes vesinikuga
seotud tegevusi, mis vastavad vesiniku
olelusringi jooksul tekkiva kasvuhoonegaaside
heite vähendamise nõudele 73,4 %, mille
tulemuseks on 3 CO2 ekvivalenttonni/tH2.
M2C2–21
Reform 4 –
Vesiniku
konkurentsivõime
edendamise
meetmed
Eesmärk Maksusoodustu
ste jõustumine
Seaduse
jõustumisele
viitav
õigusnorm
EI
KOHALDATA
PUUDUV
AD PUUDUVAD 2. kv 2022
Seaduses sätestatakse maksusoodustused, et
toetada saastevaba vesiniku tootmist ja
soodustada saastevaba vesiniku tarbimist
transpordisektoris.
Selle meetmega toetatakse üksnes vesinikuga
seotud tegevusi, mis vastavad vesiniku
olelusringi jooksul tekkiva kasvuhoonegaaside
heite vähendamise nõudele 73,4 %, mille
tulemuseks on 3 CO2 ekvivalenttonni/tH2.
M2C2–22
Investeering 4.1 –
Investeeringud
pehmesse
liikuvusse (riiklik
jalgrattateede kava)
Siht: Jalgrattateed
T1 PUUDUVAD Km 0 200 4. kv 2023
Meetme kirjelduses määratletud
suurlinnapiirkondades või ülikoole
võõrustavates linnades peab olema rajatud
vähemalt 200 km jalgrattateid.
206
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
M2C2–23
Investeering 4.1 –
Investeeringud
pehmesse
liikuvusse (riiklik
jalgrattateede kava)
Siht
Haldussertifikaa
did
jalgrattateede
ehitamiseks
PUUDUVAD Km 200 1 261 2. kv 2026
Haldustõendid, mis kinnitavad, et on tehtud
tööd vähemalt 1 261 km jalgrattateede
ehitamiseks suurlinnapiirkondadesse ja turismi
jalgrattateede ehitamiseks.
M2C2–27
Investeering 4.3
Laadimistaristu
paigaldamine
Eesmärk
Kõigi
riigihankeleping
ute sõlmimine
laadimistaristut
e
paigaldamiseks
M1
Kõigi
laadimistaristut
e paigaldamist
käsitlevate
riigihankeleping
ute sõlmimise
kohta
teatamine
PUUDUVAD PUUDUV
AD PUUDUVAD 2. kv 2023
Kõigi vähemalt 4 700 elektrisõidukite
kiirlaadimisjaama linnapiirkondadesse (kõik
omavalitsused) ehitamist käsitlevate
riigihankelepingute sõlmimise kohta teatamine.
Projekt võib hõlmata ka energia salvestamiseks
mõeldud katselaadimisjaamu.
M2C2–28
Investeering 4.3
Laadimistaristu
paigaldamine
Eesmärk
Riigihankelepin
gute sõlmimine
laadimistaristut
e
paigaldamiseks
Riigihankelepin
gute sõlmimine
laadimistaristut
e
paigaldamiseks
PUUDUVAD PUUDUV
AD PUUDUVAD 4. kv 2024
Lepingute sõlmimine vähemalt 2 100
üldkasutatava kiirlaadimistaristu punkti
ehitamiseks kiirteede ääres ja vähemalt 9 900 punkti ehitamiseks linnapiirkondades.
M2C2–29
Investeering 4.3
Laadimistaristu
paigaldamine
Siht Laadimistaristu
punktide arv PUUDUVAD Number 0 7 028 2. kv 2026
Vähemalt 7 028 elektrisõidukite laadimistaristu
punkti kohta, mis asuvad vabateedel või
linnapiirkondades, on esitatud
paigaldamissertifikaadid ja arendaja kinnitus
ühenduskulude kohta.
Elektrisõidukite laadimistaristu peab olema
vähemalt 175 kW vabateedel ja 90 kW
207
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
linnapiirkondades.
M2C2–30
Investeering 4.5 –
Erasõidukite ja
väikeste
tarbesõidukite pargi
elektrisõidukitega
uuendamise
programm
Siht Ostetud
sõidukite arv PUUDUVAD Number 0 30 830 2. kv 2026
Lepingute allkirjastamine vähemalt 30 830
heiteta sõiduki ostmiseks.
Iga ostetud sõiduki kohta tuleb esitada ka
vanametalliks lammutamise tõend, mis tõendab
termilise sõiduki vanametalliks lammutamist.
M2C2–33
Investeering 4.4.2:
Piirkondliku
ühistranspordi
raudteepargi
tugevdamine
heitevabade
rongide ja
universaalteenuse
abil
Eesmärk
Kõigi
riigihankeleping
ute sõlmimine
piirkondliku
ühistranspordi
raudteepargi
tugevdamiseks
heitevabade
rongidega ja
universaalteenu
se osutamiseks
Kõigi
piirkondliku
ühistranspordi
raudteepargi
heitevabasid
ronge ja
universaalteen
ust käsitlevate
riigihankeleping
ute sõlmimise
kohta
teatamine
PUUDUVAD PUUDUV
AD PUUDUVAD 2. kv 2023
Teade kõigi riigihankelepingute sõlmimise
kohta heiteta rongide ostmiseks39.
M2C2–35 Investeering 4.4.1:
Piirkondliku
ühistranspordi
Siht
Registreeritud
heiteta busside
arv T2
PUUDUVAD Number 800 3 000 2. kv 2026
Vähemalt 3 000 heiteta bussi registreerimine.
Nõuetele vastavad bussid kuuluvad ÜRO
Euroopa Majanduskomisjoni standardite
39 Kooskõlas määruse (EL) 2021/241 VI lisa sekkumisvaldkonnaga 72a kohaldatakse seda ka kaherežiimiliste rongide suhtes.
208
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
bussipargi
tugevdamine
heiteta bussidega
kohaselt M2- ja M3-kategooria sõidukite hulka
ning on kas elektri- või
vesinikkütuseelemendiga.
M2C2–35
ter
Investeering 4.4.1:
Piirkondliku
ühistranspordi
bussipargi
tugevdamine
heiteta bussidega
Siht
Heiteta ja
vähese heitega
busside
laadimispunktid
e arv
PUUDUVAD Number 0 1 000 2. kv 2026
Haldussertifikaadid, mis kinnitavad
liitumiskulude hinnangu paigaldamist ja
aktsepteerimist arendaja poolt vähemalt 1 000
laadimispunkti puhul.
M2C2–36
Investeering 4.4.3:
Riikliku tuletõrje
juhtimise alla
kuuluva laevastiku
uuendamine
Siht
Keskkonnasõbr
alike sõidukite
arv riikliku
tuletõrjemeesko
nna koosseisu
uuendamiseks
PUUDUVAD Number 0 3 800 4. kv 2025
Vähemalt 3 800 keskkonnasõbraliku sõiduki
registreerimine riikliku tuletõrjemeeskonna
koosseisu uuendamiseks.
Vähemalt 3 500 sõidukit peavad olema 100 %
elektrilised, ülejäänu peab töötama biokütusel
või biometaanil.
Biokütuse tootjad peavad esitama
sõltumatu(te) hindaja(te) väljastatud
sertifikaadi(d) (kestlikkuse tõendamine), mis on
osa komisjoni tunnustatud vabatahtlikest
kavadest või riiklikest kavadest kooskõlas
direktiivi 2018/2001 artikli 30 lõigetega 1, 4 või
6.
Lisaks täpsustatakse biometaani tarnijaga
sõlmitud lepingus, et käitaja ostab
päritolutagatise sertifikaadid eeldatava
209
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
kütusekasutuse jaoks.
Biokütusel töötavatele sõidukitele antakse
tüübikinnitus B100 jaoks.
M2C2–37
Reform 5:
Arukamad
menetlused
projektide
hindamiseks
kohalike
ühistranspordisüste
emide sektoris, kus
on paigaldised, ja
kiire ühistranspordi
sektoris
Eesmärk
Dekreet-
seaduse
jõustumine
Seaduse säte,
mis viitab
dekreet-
seaduse
jõustumisele
PUUDUVAD PUUDUV
AD PUUDUVAD 4. kv 2021
Dekreet-seadusega lihtsustatakse kohaliku
ühistranspordiga seotud projektide
hindamiskriteeriume ning kiirendatakse
kavandamis- ja loamenetlust.
M2C2–38
Investeering 5.1:
Taastuvad
energiaallikad ja
akud
Eesmärk
Ministri
käskkirja
jõustumine
Seaduse säte,
mis viitab
ministri
dekreedi
jõustumisele
PUUDUVAD PUUDUV
AD PUUDUVAD 2. kv 2022
Ministri käskkirjas määratakse kindlaks
olemasolevate vahendite summa, abisaajate
juurdepääsunõuded, programmide ja projektide
rahastamiskõlblikkuse tingimused,
rahastamiskõlblikud kulud ning suure
tõhususega päikesepaneelide ja akude
arendamiseks antava abi vorm ja osatähtsus.
M2C2–41 Investeering 5.3:
Elektribussid Eesmärk
Jõustub ministri
dekreet, millega
määratakse
kindlaks
Ministri
käskkirja säte
jõustumise
kohta
PUUDUVAD PUUDUV
AD PUUDUVAD 4. kv 2021
Ministri käskkirjas määratakse kindlaks
olemasolevate vahendite summa ligikaudu 45
tööstuse ümberkujundamise projekti
rakendamiseks „Arengulepingute“ kaudu.
210
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
sekkumise
eesmärgi
saavutamiseks
kasutada
olevad
vahendid
(busside
tarneahel).
M2C2–42
Investeering 5.4:
Omakapitalisüst
rohepöörde fondi
(GTF)
Eesmärk
Rahastamislepi
ngu
allkirjastamine
Rahastamislepi
ngu
allkirjastamisest
teatamine
PUUDUVAD PUUDUV
AD PUUDUVAD 2. kv 2022
Rahastamislepingus sätestatakse kaudsed
investeeringud riskikapitalifondide valitsejate
rahastamisse koos investeeringute ja
ettevõtetega/alustavate ettevõtetega kooskõlas
rohepöörde eesmärkidega, et laiendada
teadlastele ja idufirmadele kättesaadavat
kapitali, tugevdada tegutsevate
riskikapitalifondide tegevust ning arendada uusi
ja uuenduslikke ettevõtteid partnerluses
äriühingutega.
Rahastamisleping sisaldab järgmist:
- investeerimispoliitika, - abikõlblikkuse kriteeriumid, käesoleva meetme raames toetatavate
tehingute vastavus põhimõtte „ei kahjusta
oluliselt“ tehnilistele suunistele (2021/C58/01),
kasutades kestlikkuskontrolli,
välistamisnimekirja ning nõuet järgida
asjakohaseid ELi ja riiklikke keskkonnaalaseid
211
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
õigusakte.
M2C2–55
Investeering 5.5:
Roheline
maksukrediit
Siht
Ettevõtetele
2024.–2025.
aastal esitatud
dokumentide
alusel antud
maksukrediidid
PUUDUVAD
Eraldatud
vahendite
summa
(eurodes)
0 721 000 000 2. kv 2026
Teade kõigi taaste- ja vastupidavusrahastu
vahendite eraldamise kohta, mis on selleks
investeeringuks ette nähtud.
Vähemalt 288 400 000 euro suurune
investeering aitab kaasa kliimamuutustega
seotud eesmärkide saavutamisele kooskõlas
taaste- ja vastupidavusrahastu määruse VI
lisaga.
212
E.3. Laenuga seotud reformide ja investeeringute kirjeldus
Investeering 1.1 – Põllumajandusliku päikeseenergia süsteemide arendamine
See meede hõlmab avaliku sektori investeeringut toetuskavasse, et stimuleerida erainvesteeringuid ja
parandada juurdepääsu rahastamisele Itaalia põllumajandus- ja taastuvenergiasektoris. Kava toimib toetuste
andmise kaudu otse erasektorile.
Kava haldab rakenduspartnerina Gestore Servizi Energetici S.p.A. (GSE). Kava raames antakse toetust, mis
katab osa projekti kuludest. Kavaga toetatakse põllumajandusega seotud päikeseenergiasüsteemide ehitamist,
mis hõlmab fotogalvaaniliste seadmete paigaldamist põllumajandusmaale koos mõõtevahenditega, et jälgida
aluseks olevat põllumajanduslikku tegevust40.
Kavasse tehtava investeeringu rakendamiseks allkirjastavad Itaalia ja GSE rakenduskokkuleppe, mis sisaldab
järgmist:
1. Kava otsustusprotsessi kirjeldus: Kava lõpliku rahastamisotsuse teeb investeerimiskomitee või
muu asjakohane samaväärne juhtorgan ja see kiidetakse heaks valitsusest sõltumatute liikmete
häälteenamusega.
2. Seotud toetuspoliitika põhinõuded,mis hõlmavad järgmist:
a. Antud toetuste ja rahastamiskõlblike lõplike abisaajate kirjeldus.
b. Nõue, et kõik toetatavad investeeringud peavad olema majanduslikult elujõulised.
c. Nõue järgida põhimõtet „ei kahjusta oluliselt“, nagu on sätestatud põhimõtte „ei kahjusta
oluliselt“ tehnilistes suunistes (2021/C58/01). Eelkõige jäetakse toetuspõhimõtetega
rahastamiskõlblikkuse alt välja järgmised tegevused ja varad: i) fossiilkütustega seotud tegevus ja
varad, sealhulgas allkasutus, ii) ELi heitkogustega kauplemise süsteemi41 (HKS) alla kuuluvad
tegevused ja varad, millega saavutatakse prognoositud kasvuhoonegaaside heide, mis ei ole
asjaomastest võrdlusalustest väiksem,42 iii) prügilate, jäätmepõletustehaste ja mehaanilis-
bioloogilise töötlemise jaamadega seotud tegevus43 ja varad44.
40 Konkreetsete projektidega seotud lõplikud toetusesaajad peavad kliimaalase panuse arvutamiseks esitama iga
toetatava projekti kohta valitud sekkumisvaldkonna põhjenduse koos projekti kirjeldusega. Kliimaalase panuse
arvutamiseks peavad lõplikud abisaajad omakapitalist, kvaasiomakapitalist, äriühingu võlakirjadest või samaväärsetest
vahenditest, mis ei ole suunatud konkreetsetele projektidele, valitud sekkumisvaldkonda(sid) põhjendama.
Rakenduspartner peab samuti esitama liikmesriigile poolaastaaruande iga projekti/tegevuse rakendamise kohta. 41 Välja arvatud a) varad ja tegevused maagaasi kasutavas elektri- ja/või soojusenergia tootmises ning sellega seotud
ülekande- ja jaotustaristus, mis vastavad põhimõtte „ei kahjusta oluliselt“ tehniliste suuniste (2021/C58/01) III lisas
sätestatud tingimustele, ning b) alapunktis ii osutatud tegevused ja varad, mille puhul fossiilkütuste kasutamine on
fossiilkütustevabale käitamisele õigeaegseks üleminekuks ajutine ja tehniliselt vältimatu. 42 Kui toetatava tegevusega saavutatakse prognoositud kasvuhoonegaaside heide, mis ei ole asjaomastest võrdlusalustest
oluliselt väiksem, esitatakse selgitus selle kohta, miks see ei ole võimalik. Saastekvootide tasuta eraldamise
võrdlusalused saastekvootidega kauplemise süsteemi kohaldamisalasse kuuluvate tegevuste jaoks on sätestatud
komisjoni rakendusmääruses (EL) 2021/447. 43 Välistamist ei kohaldata meetme tegevuste suhtes, mis toimuvad üksnes ringlussevõetamatute ohtlike jäätmete
töötlemisega tegelevates jaamades, ega olemasolevate jaamade suhtes, kui meetme tegevuste eesmärk on suurendada
energiatõhusust, koguda heitgaase ladustamiseks või kasutamiseks või taaskasutada põletustuhas leiduvaid materjale,
tingimusel et need tegevused ei suurenda jaamade jäätmetöötlusvõimsust ega pikenda nende kasutusiga; tõendid selle
kohta tuleb esitada iga jaama kohta eraldi. 44 Välistamist ei kohaldata meetme tegevuste suhtes, mis toimuvad olemasolevates mehhaanilis-bioloogilise töötlemise
jaamades, kus nende tegevuste eesmärk on suurendada energiatõhusust või moderniseerida eraldatud jäätmete
ringlussevõttu biojäätmete kompostimiseks ja biojäätmete anaeroobseks lagundamiseks, tingimusel et need tegevused ei
suurenda jaamade jäätmetöötlusvõimsust ega pikenda nende kasutusiga; tõendid selle kohta tuleb esitada iga jaama
kohta eraldi.
213
d. Nõue, et kava lõplikud abisaajad ei tohi samade kulude katmiseks saada toetust muudest liidu
vahenditest.
3. Rakenduslepinguga hõlmatud summa, rakenduspartneri tasude struktuur ja nõue kasutada kava
kasutamata tulu, sealhulgas pärast 2026. aastat, samadel poliitilistel eesmärkidel.
4. Seire-, auditi- ja kontrollinõuded, sealhulgas:
1. Rakenduspartneri kasutatud toetustest aruandmise järelevalvesüsteemi kirjeldus.
2. Rakenduspartneri selliste menetluste kirjeldus, millega tagatakse pettuste, korruptsiooni ja
huvide konfliktide ennetamine, avastamine ja kõrvaldamine.
3. Kohustus kontrollida enne toimingule toetuse andmist iga toimingu abikõlblikkust vastavalt
rakenduslepingus sätestatud nõuetele.
4. Kohustus teha riskipõhiseid järelauditeid kooskõlas GSE auditikavaga. Nende auditite
käigus kontrollitakse järgmist:
i) kontrollisüsteemide tõhusus, sealhulgas pettuste, korruptsiooni ja huvide konflikti
avastamine;
ii) põhimõtte „ei kahjusta oluliselt“ järgimine, riigiabi eeskirjad, kliimaeesmärgi nõuded; ja
iii) järgitakse nõuet, et kava lõplikud abisaajad ei ole saanud samade kulude katmiseks
toetust muudest liidu vahenditest. Auditite käigus kontrollitakse ka tehingute seaduslikkust
ning kohaldatava rakenduslepingu ja toetuslepingute tingimuste täitmist.
Investeering 1.2 – Taastuvate energiaallikate edendamine energiakogukondade ja ühiselt oma tarbeks
toodetud taastuvenergia tarbijate jaoks
See meede hõlmab avaliku sektori investeeringut toetuskavasse, et stimuleerida erainvesteeringuid ja
parandada juurdepääsu rahastamisele Itaalias, et toetada uue elektritootmisvõimsuse paigaldamist
kollektiivsete konfiguratsioonide ja taastuvenergiakogukondade jaoks, mis asuvad alla 50 000 elanikuga
omavalitsustes45. Abikava raames antakse toetusi otse erasektorile ja sarnase tegevusega tegelevatele avaliku
sektori asutustele.
Kava haldab rakenduspartnerina Gestore dei Servizi Energetiche S.p.A. (edaspidi „GSE“). Kava hõlmab
järgmist tooteseeriat:
• Toetus, mis katab maksimaalselt 40 % projekti kuludest taastuvate energiaallikate ja tootmisrajatiste
ehitamiseks, võimaluse korral koos energia salvestamisega.
Kavasse tehtava investeeringu rakendamiseks allkirjastavad Itaalia ja GSE rakenduskokkuleppe, mis sisaldab
järgmist:
1. Kava otsustusprotsessi kirjeldus: Kava lõpliku rahastamisotsuse teeb investeerimiskomitee või muu
asjakohane samaväärne juhtorgan ja see kiidetakse heaks valitsusest sõltumatute liikmete
häälteenamusega.
2. Seotud toetuspoliitika põhinõuded,mis hõlmavad järgmist:
a. Antud toetuste ja rahastamiskõlblike lõplike abisaajate kirjeldus.
45 Konkreetsete projektidega seotud lõplikud toetusesaajad peavad kliimaalase panuse arvutamiseks esitama iga
toetatava projekti kohta valitud sekkumisvaldkonna põhjenduse koos projekti kirjeldusega. Kliimaalase panuse
arvutamiseks esitavad lõplikud abisaajad, kes saavad toetust omakapitali, kvaasiomakapitali, äriühingu võlakirjade või
samaväärsete vahendite kaudu, mis ei ole suunatud konkreetsetele projektidele, valitud sekkumisvaldkonna (-
valdkondade) kohta põhjenduse. Rakenduspartner peab samuti esitama liikmesriigile poolaastaaruande iga
projekti/tegevuse rakendamise kohta.
214
b. Nõue, et kõik toetatavad investeeringud peavad olema majanduslikult elujõulised;
c. Nõue järgida põhimõtet „ei kahjusta oluliselt“, nagu on sätestatud põhimõtte „ei kahjusta
oluliselt“ tehnilistes suunistes (2021/C58/01). Eelkõige jäetakse toetuspõhimõtetega
rahastamiskõlblikkuse alt välja järgmised tegevused ja varad: i) fossiilkütustega seotud tegevus ja
varad, sealhulgas allkasutus, ii) ELi heitkogustega kauplemise süsteemi46 (HKS) alla kuuluvad
tegevused ja varad, millega saavutatakse prognoositud kasvuhoonegaaside heide, mis ei ole
asjaomastest võrdlusalustest väiksem,47 iii) prügilate, jäätmepõletustehaste ja mehaanilis-
bioloogilise töötlemise jaamadega seotud tegevus48 ja varad49.
d. Nõue, et kava lõplikud abisaajad ei tohi samade kulude katmiseks saada toetust muudest liidu
vahenditest.
3. Rakenduslepinguga hõlmatud summa, rakenduspartneri tasude struktuur ja nõue kasutada kava
kasutamata tulu, sealhulgas pärast 2026. aastat, samadel poliitilistel eesmärkidel.
4. Seire-, auditi- ja kontrollinõuded, sealhulgas:
1. Rakenduspartneri kasutatud toetustest aruandmise järelevalvesüsteemi kirjeldus.
2. Rakenduspartneri selliste menetluste kirjeldus, millega tagatakse pettuste, korruptsiooni ja
huvide konfliktide ennetamine, avastamine ja kõrvaldamine.
3. Kohustus kontrollida enne tegevuse jaoks toetuse andmist iga tegevuse
rahastamiskõlblikkust kooskõlas rakenduslepingus sätestatud nõuetega.
4. Kohustus teha riskipõhiseid järelauditeid kooskõlas GSE auditikavaga. Auditite käigus
veendutakse, et i) kontrollisüsteemid on tõhusad, muu hulgas pettuste, korruptsiooni ja
huvide konfliktide avastamisel, ii) põhimõtte „ei kahjusta oluliselt“ järgimine, riigiabi
eeskirjad; ning iii) järgitakse nõuet, et kava lõplikud abisaajad ei tohi olla saanud samade
kulude katmiseks toetust muudest liidu vahenditest. Auditite käigus kontrollitakse ka
tehingute seaduslikkust ning kohaldatava rakendus- ja toetuslepingu tingimuste täitmist.
Investeering 1.4 – Biometaani arendamine vastavalt ringmajanduse edendamise kriteeriumidele
See meede hõlmab avaliku sektori investeeringut toetuskavasse, et stimuleerida erainvesteeringuid ja
parandada juurdepääsu rahastamisele Itaalia biometaani tootmises. Abikava raames antakse toetusi otse
erasektorile50.
46 Välja arvatud a) varad ja tegevused maagaasi kasutavas elektri- ja/või soojusenergia tootmises ning sellega seotud
ülekande- ja jaotustaristus, mis vastavad põhimõtte „ei kahjusta oluliselt“ tehniliste suuniste (2021/C58/01) III lisas
sätestatud tingimustele, ning b) alapunktis ii osutatud tegevused ja varad, mille puhul fossiilkütuste kasutamine on
fossiilkütustevabale käitamisele õigeaegseks üleminekuks ajutine ja tehniliselt vältimatu. 47 Kui toetatava tegevusega saavutatakse prognoositud kasvuhoonegaaside heide, mis ei ole asjaomastest võrdlusalustest
oluliselt väiksem, esitatakse selgitus selle kohta, miks see ei ole võimalik. Saastekvootide tasuta eraldamise
võrdlusalused saastekvootidega kauplemise süsteemi kohaldamisalasse kuuluvate tegevuste jaoks on sätestatud
komisjoni rakendusmääruses (EL) 2021/447. 48 Välistamist ei kohaldata meetme tegevuste suhtes, mis toimuvad üksnes ringlussevõetamatute ohtlike jäätmete
töötlemisega tegelevates jaamades, ega olemasolevate jaamade suhtes, kui meetme tegevuste eesmärk on suurendada
energiatõhusust, koguda heitgaase ladustamiseks või kasutamiseks või taaskasutada põletustuhas leiduvaid materjale,
tingimusel et need tegevused ei suurenda jaamade jäätmetöötlusvõimsust ega pikenda nende kasutusiga; tõendid selle
kohta tuleb esitada iga jaama kohta eraldi. 49 Välistamist ei kohaldata meetme tegevuste suhtes, mis toimuvad olemasolevates mehhaanilis-bioloogilise töötlemise
jaamades, kus nende tegevuste eesmärk on suurendada energiatõhusust või moderniseerida eraldatud jäätmete
ringlussevõttu biojäätmete kompostimiseks ja biojäätmete anaeroobseks lagundamiseks, tingimusel et need tegevused ei
suurenda jaamade jäätmetöötlusvõimsust ega pikenda nende kasutusiga; tõendid selle kohta tuleb esitada iga jaama
kohta eraldi. 50 Konkreetsete projektidega seotud lõplikud toetusesaajad peavad kliimaalase panuse arvutamiseks esitama iga
toetatava projekti kohta valitud sekkumisvaldkonna põhjenduse koos projekti kirjeldusega. Kliimaalase panuse
arvutamiseks esitavad lõplikud abisaajad omakapitalist, kvaasiomakapitalist, äriühingu võlakirjadest või samaväärsetest
vahenditest, mis ei ole suunatud konkreetsetele projektidele, valitud sekkumisvaldkonna (-valdkondade) kohta
215
Kava haldab rakenduspartnerina Gestore dei Servizi Energetici (GSE). Kava hõlmab vähemalt ühte
järgmistest tootesarjadest:
• Toetus uute biometaani tootmise tehaste ehitamiseks.
• Olemasolevate põllumajanduslike biogaasitehaste (sealhulgas tahkete olmejäätmete orgaaniline
fraktsioon) ümberkorraldamine ja nende tõhususe parandamine, et toota biometaani transpordi,
tööstuse ja kütte jaoks.
• Vananenud ja vähetõhusate mehaaniliste sõidukite asendamine biometaaniga töötavate sõidukitega.
• Biogaasi tootmise keskkonnasäästlike tavade toetamine, sealhulgas mulla häirimise tavade
vähendamine (minimaalne maaharimine) ja vähese heitega süsteemide kasutuselevõtt
kääritussaaduste kasutamiseks.
• Olemasolevate biogaasitehaste tõhususe suurendamine, sealhulgas kohapealne soojuse
taaskasutamine ja heitkoguste vähendamine.
Kavasse tehtava investeeringu rakendamiseks allkirjastavad Itaalia ja GSE rakenduskokkuleppe, mis sisaldab
järgmist:
1. Kava otsustusprotsessi kirjeldus: Kava lõpliku rahastamisotsuse teeb investeerimiskomitee või muu
asjakohane samaväärne juhtorgan ja see kiidetakse heaks valitsusest sõltumatute liikmete
häälteenamusega.
2. Seotud toetuspoliitika põhinõuded,mis hõlmavad järgmist:
a. Antud toetuste ja rahastamiskõlblike lõplike abisaajate kirjeldus.
b. Nõue, et kõik toetatavad investeeringud peavad olema majanduslikult elujõulised;
c. Nõue järgida põhimõtet „ei kahjusta oluliselt“, nagu on sätestatud põhimõtte „ei kahjusta
oluliselt“ tehnilistes suunistes (2021/C58/01). Eelkõige jäetakse toetuspõhimõtetega
rahastamiskõlblikkuse alt välja järgmised tegevused ja varad: i) fossiilkütustega seotud tegevus ja
varad, sealhulgas allkasutus, ii) ELi heitkogustega kauplemise süsteemi51 (HKS) alla kuuluvad
tegevused ja varad, millega saavutatakse prognoositud kasvuhoonegaaside heide, mis ei ole
asjaomastest võrdlusalustest väiksem,52 iii) prügilate, jäätmepõletustehaste ja mehaanilis-
bioloogilise töötlemise jaamadega seotud tegevus53 ja varad54. Biometaan ja biogaas peavad
põhjenduse. Rakenduspartner peab samuti esitama liikmesriigile poolaastaaruande iga projekti/tegevuse rakendamise
kohta. 51Välja arvatud a) varad ja tegevused maagaasi kasutavas elektri- ja/või soojusenergia tootmises ning sellega seotud
ülekande- ja jaotustaristus, mis vastavad põhimõtte „ei kahjusta oluliselt“ tehniliste suuniste (2021/C58/01) III lisas
sätestatud tingimustele, ning b) alapunktis ii osutatud tegevused ja varad, mille puhul fossiilkütuste kasutamine on
fossiilkütustevabale käitamisele õigeaegseks üleminekuks ajutine ja tehniliselt vältimatu. 52 Kui toetatava tegevusega saavutatakse prognoositud kasvuhoonegaaside heide, mis ei ole asjaomastest võrdlusalustest
oluliselt väiksem, esitatakse selgitus selle kohta, miks see ei ole võimalik. Saastekvootide tasuta eraldamise
võrdlusalused saastekvootidega kauplemise süsteemi kohaldamisalasse kuuluvate tegevuste jaoks on sätestatud
komisjoni rakendusmääruses (EL) 2021/447. 53 Välistamist ei kohaldata meetme tegevuste suhtes, mis toimuvad üksnes ringlussevõetamatute ohtlike jäätmete
töötlemisega tegelevates jaamades, ega olemasolevate jaamade suhtes, kui meetme tegevuste eesmärk on suurendada
energiatõhusust, koguda heitgaase ladustamiseks või kasutamiseks või taaskasutada põletustuhas leiduvaid materjale,
tingimusel et need tegevused ei suurenda jaamade jäätmetöötlusvõimsust ega pikenda nende kasutusiga; tõendid selle
kohta tuleb esitada iga jaama kohta eraldi. 54 Välistamist ei kohaldata meetme tegevuste suhtes, mis toimuvad olemasolevates mehhaanilis-bioloogilise töötlemise
jaamades, kus nende tegevuste eesmärk on suurendada energiatõhusust või moderniseerida eraldatud jäätmete
ringlussevõttu biojäätmete kompostimiseks ja biojäätmete anaeroobseks lagundamiseks, tingimusel et need tegevused ei
suurenda jaamade jäätmetöötlusvõimsust ega pikenda nende kasutusiga; tõendid selle kohta tuleb esitada iga jaama
kohta eraldi.
216
vastama direktiivis 2018/2001 (II taastuvenergia direktiiv) sätestatud kriteeriumidele ja määruse
(EL) 2021/241 VI lisa joonealuse märkuse 8 asjakohastele nõuetele. Lisaks täpsustatakse
biometaanil töötavate sõidukite puhul käitajaga sõlmitud õiguslikus kokkuleppes, et käitaja ostab
eeldatava kütusekasutuse kohta päritolutagatise sertifikaadid.
d. Nõue, et kava lõplikud abisaajad ei tohi samade kulude katmiseks saada toetust muudest liidu
vahenditest.
3. Rakenduslepinguga hõlmatud summa, rakenduspartneri tasude struktuur ja nõue kasutada kava
kasutamata tulu, sealhulgas pärast 2026. aastat, samadel poliitilistel eesmärkidel.
4. Seire-, auditi- ja kontrollinõuded, sealhulgas:
1. Rakenduspartneri kasutatud toetustest aruandmise järelevalvesüsteemi kirjeldus.
2. Rakenduspartneri selliste menetluste kirjeldus, millega tagatakse pettuste, korruptsiooni ja
huvide konfliktide ennetamine, avastamine ja kõrvaldamine.
3. Kohustus kontrollida enne toimingule toetuse andmist iga toimingu abikõlblikkust vastavalt
rakenduslepingus sätestatud nõuetele.
4. Kohustus teha riskipõhiseid järelauditeid kooskõlas GSE auditikavaga. Auditite käigus
veendutakse, et i) kontrollisüsteemid on tõhusad, muu hulgas pettuste, korruptsiooni ja
huvide konfliktide avastamisel, ii) põhimõtte „ei kahjusta oluliselt“ järgimine, riigiabi
eeskirjad, kliimaeesmärgi nõuded; ning iii) järgitakse nõuet, et kava lõplikud abisaajad ei
tohi olla saanud samade kulude katmiseks toetust muudest liidu vahenditest. Auditite käigus
kontrollitakse ka tehingute seaduslikkust ja kohaldatavate rakenduslepingu toetuslepingute
tingimuste täitmist.
Investeering 2.1 – Arukate võrkude tugevdamine
Selle investeeringu eesmärk on elektrijaotusvõrgu taristu ajakohastamine ja digitaliseerimine. Investeering
seisneb toetuste andmises võrguettevõtjatele, et rahastada sekkumisi, mis suurendavad võrgu
vastuvõtuvõimsust ja maksimaalset elektrit, mida võrk tarbimiseks tarnib.
Investeering 2.2 – Sekkumised elektrivõrgu vastupidavuse suurendamiseks
Selle investeeringu eesmärk on suurendada ülekande- ja jaotusvõrgu vastupidavust äärmuslikele
ilmastikunähtustele, vähendades seega elektrivarustuse pikaajaliste katkestuste tõenäosust. Investeering
seisneb toetuste andmises võrguettevõtjatele töödeks, mis suurendavad elektrivõrgu vastupidavust.
Investeering 3.1 – Vesiniku tootmine mahajäetud tööstusaladel (Hydrogen Valleys)
Selle investeeringu eesmärk on luua uued vesinikuorud, st taastuvallikatest toodetud vesiniku kohalik
tootmine ja kasutamine tööstuses, VKEdes ja kohalikus transpordis mahajäetud tööstuspiirkondades.
Investeering seisneb toetuste andmises vesinikuorgude loomise projektide elluviimiseks.
Investeering 3.2 – Vesiniku kasutamine tööstuses, kus heidet on raske vähendada
See investeering seisneb tööstusprotsessidega seotud teadus- ja arendustegevuse ning innovatsiooni
toetamises, et töötada välja algatused vesiniku kasutamiseks tööstussektorites, mis kasutavad metaani
soojusenergia energiaallikana (tsement, paberivabrikud, keraamika- ja klaasitööstus jne). Fossiilkütuste
sektor, näiteks naftatöötlemistehased, ei ole rahastamiskõlblik. Selle meetmega toetatakse elektrolüüsil
põhinevat vesinikutootmist, kasutades direktiivis (EL) 2018/2001 (taastuvenergia direktiiv) määratletud
taastuvaid energiaallikaid, või võrguelektrit.
Tagamaks, et meede vastab olulise kahju ärahoidmise põhimõttele taaste- ja vastupidavusrahastu raames,
nagu on sätestatud põhimõtte „ei kahjusta oluliselt“ tehnilistes suunistes (2021/C58/01), jäetakse tulevaste
projektikonkursside rahastamiskõlblikkuse kriteeriumidest välja ELi heitkogustega kauplemise süsteemi
raames toimuv tegevus, millega saavutatakse prognoositud kasvuhoonegaaside heide, mis ei ole asjaomastest
võrdlusalustest väiksem. Kui tegevusega saavutatakse prognoositud kasvuhoonegaaside heide, mis ei ole
oluliselt väiksem, kuid siiski väiksem kui asjaomased võrdlusalused, esitatakse selgitus selle kohta, miks see
217
ei ole võimalik. Saastekvootide tasuta eraldamise võrdlusalused saastekvootidega kauplemise süsteemi
kohaldamisalasse kuuluvate tegevuste jaoks on sätestatud komisjoni rakendusmääruses (EL) 2021/447.
Investeering 3.4 – Vesinikukatsed raudtee- ja maanteetranspordis
Selle investeeringu eesmärk on aidata kaasa vesiniku kasutamisele tankimiseks.
See investeering hõlmab vesinikul põhinevate raudteetanklate ehitamist eelistatavalt kohalike
taastuvallikatest toodetud vesiniku tootmiskohtade ja/või kiirteede vesinikutanklate lähedale ning vesinikul
põhinevate tanklate ehitamist maanteetranspordi jaoks.
Investeering 3.5 – Vesinikualane teadus- ja arendustegevus
Selle investeeringu eesmärk on toetada teadus- ja arendustegevust kogu vesiniku väärtusahelas. Investeering
seisneb saastevaba vesiniku tootmist, vesiniku ladustamist, transporti ning derivaatideks ja e-kütusteks
muundamist, kütuseelemente ja vesinikupõhise taristu integreeritud arukaid juhtimissüsteeme käsitlevate
vesinikualase teadus- ja arendustegevuse projektide toetamises.
Investeering 4.2 – Kiirtranspordisüsteemide arendamine
Meetme eesmärk on suurendada ühistranspordisüsteemi kiiret kasutamist, soodustades üleminekut
autotranspordilt ühistranspordile. See investeering hõlmab uute kiirtranspordisüsteemide liinide ehitamist ja
olemasolevate laiendamist, kiirtranspordisüsteemide taristu ajakohastamist ning heiteta veeremi ostmist
kiirtranspordisüsteemide jaoks.
Investeering 4.4.1 – Piirkondliku ühistranspordi heiteta bussipargi tugevdamine
Investeeringu eesmärk on vähendada kasvuhoonegaaside heidet ja ajakohastada ühistranspordi bussiparki.
See investeering hõlmab heiteta busside hankimist ja laadimisjaamade paigaldamist.
Investeering 4.4.2 – Piirkondliku ühistranspordi raudteepargi tugevdamine heitevabade rongide ja
universaalteenusega
Investeeringu eesmärk on vähendada raudteetranspordi kasvuhoonegaaside heidet ja ajakohastada
raudteeparki. See investeering hõlmab vähemalt 118 heiteta reisirongi hankimist.
Investeering 4.4.3 – Riikliku tuletõrjeteenistuse laevastiku uuendamine
Investeeringu eesmärk on vähendada kasvuhoonegaaside heidet ja ajakohastada tuletõrjeautoparki. See
investeering hõlmab vähemalt 3 800 sõiduki hankimist riikliku tuletõrjebrigaadi jaoks.
Investeering 4.6 – Diagnostikarongid
Meetme eesmärk on tugevdada diagnostikarongide veeremit. Meede hõlmab vähemalt seitsme
diagnostikarongi ostmist ja vähemalt kahe diagnostikarongi seadmete ostmist.
Investeering 5.1 – Ökoloogilise ülemineku tootmissüsteemi, nullnetotehnoloogia ning strateegiliste
tarneahelate konkurentsivõime ja vastupidavuse toetamine
See meede koosneb kahest allinvesteeringust.
Allinvesteering 1:
See allinvesteering koosneb avaliku sektori investeeringust rahastusse „nullnetotehnoloogia“, et stimuleerida
erainvesteeringuid ja parandada juurdepääsu rahastamisele energiatõhususe, oma tarbeks taastuvenergia
tootmise ja tootmisprotsessi kestliku ümberkujundamise valdkonnas.
Investeeringuga toetatakse järgmist:
218
i) riikliku tootmissüsteemi ökoloogiline üleminek eri tasanditel, toetades investeeringuid ökoloogilise
üleminekuga seotud seadmete ning nende otseste ja kaudsete komponentide (nt aku- ja
energiasalvestus, päikese- ja tuuleenergia tehnoloogiad, soojuspumbad ja maapõueenergia
tehnoloogiad, vesinikutehnoloogiad ning süsinikdioksiidi kogumise ja säilitamise seadmed)
tootmisahelate tugevdamisse;
ii) tootmisprotsesside energiatõhusus (ka taastuvatest energiaallikatest omatarbeks elektri tootmise
kaudu, välja arvatud biomass);
iii) tootmisprotsesside kestlikkus, pidades silmas ka ringmajandust ja ressursside tõhusamat kasutamist.
Investeering i hõlmab järgmisi tootesarju:
- Esimene neist keskendub fotogalvaanilise või tuuleenergia tehnoloogia tootmisele.
- Teises keskendutakse patareide ja akude tootmisele.
Rahastu toimib tagastamatute toetuste, subsideeritud laenude ja intressitoetuste andmise kaudu otse
erasektorile.
Rahastut haldab rakenduspartnerina Invitalia S.p.A. Rahastu hõlmab järgmisi rahastamisvahendeid:
• Arendusleping, millega toetatakse üle 20 000 000 euro suurusi nullnetotehnoloogia projekte, andes
toetusi, intressitoetusi ja subsideeritud laene.
• Tööstuse ümberkujundamise fond, millest toetatakse 3 000 000 kuni 20 000 000 euro suuruseid
projekte , andes toetusi.
Rahastusse tehtava investeeringu rakendamiseks allkirjastavad Itaalia ja Invitalia S.p.A. rakenduslepingu,
mis sisaldab järgmist:
1. Rahastu otsustusprotsessi kirjeldus: Rahastu lõplikud investeerimis- ja rahastamisotsused võtab vastu
investeerimiskomitee või muu asjakohane samaväärne juhtorgan ning need kiidetakse heaks
valitsusest sõltumatute liikmete häälteenamusega.
2. Seotud investeerimispoliitika põhinõuded, mis hõlmavad järgmist:
a. Finantstoodete ja rahastamiskõlblike lõplike abisaajate kirjeldus.
b. Nõue, et kõik toetatavad investeeringud peavad olema majanduslikult elujõulised;
c. Nõue järgida põhimõtet „ei kahjusta oluliselt“, nagu on sätestatud põhimõtte „ei kahjusta
oluliselt“ tehnilistes suunistes (2021/C58/01). Eelkõige jäetakse investeerimispoliitikaga
rahastamiskõlblikkuse alt välja järgmised tegevused ja varad: i) fossiilkütustega seotud
tegevus ja varad, sealhulgas allkasutus, ii) ELi heitkogustega kauplemise süsteemi55 (HKS)
alla kuuluvad tegevused ja varad, millega saavutatakse prognoositud kasvuhoonegaaside
heide, mis ei ole asjaomastest võrdlusalustest väiksem,56 iii) prügilate, jäätmepõletustehaste ja
mehaanilis-bioloogilise töötlemise jaamadega seotud tegevus57 ja varad58.
55 Välja arvatud a) varad ja tegevused maagaasi kasutavas elektri- ja/või soojusenergia tootmises ning sellega seotud
ülekande- ja jaotustaristus, mis vastavad põhimõtte „ei kahjusta oluliselt“ tehniliste suuniste (2021/C58/01) III lisas
sätestatud tingimustele, ning b) alapunktis ii osutatud tegevused ja varad, mille puhul fossiilkütuste kasutamine on
fossiilkütustevabale käitamisele õigeaegseks üleminekuks ajutine ja tehniliselt vältimatu. 56 Kui toetatava tegevusega saavutatakse prognoositud kasvuhoonegaaside heide, mis ei ole asjaomastest võrdlusalustest
oluliselt väiksem, esitatakse selgitus selle kohta, miks see ei ole võimalik. Saastekvootide tasuta eraldamise
võrdlusalused saastekvootidega kauplemise süsteemi kohaldamisalasse kuuluvate tegevuste jaoks on sätestatud
komisjoni rakendusmääruses (EL) 2021/447. 57 Välistamist ei kohaldata meetme tegevuste suhtes, mis toimuvad üksnes ringlussevõetamatute ohtlike jäätmete
töötlemisega tegelevates jaamades, ega olemasolevate jaamade suhtes, kui meetme tegevuste eesmärk on suurendada
energiatõhusust, koguda heitgaase ladustamiseks või kasutamiseks või taaskasutada põletustuhas leiduvaid materjale,
tingimusel et need tegevused ei suurenda jaamade jäätmetöötlusvõimsust ega pikenda nende kasutusiga; tõendid selle
kohta tuleb esitada iga jaama kohta eraldi. 58 Välistamist ei kohaldata meetme tegevuste suhtes, mis toimuvad olemasolevates mehhaanilis-bioloogilise töötlemise
jaamades, kus nende tegevuste eesmärk on suurendada energiatõhusust või moderniseerida eraldatud jäätmete
ringlussevõttu biojäätmete kompostimiseks ja biojäätmete anaeroobseks lagundamiseks, tingimusel et need tegevused ei
219
d. Nõue, et rahastu lõplikud toetusesaajad ei saa samade kulude katmiseks toetust muudest liidu
vahenditest.
3. Rakenduslepinguga hõlmatud summa, rakenduspartneri tasude struktuur ja nõue reinvesteerida mis
tahes tagasisaadavad vahendid vastavalt rahastu investeerimispoliitikale.
4. Seire-, auditi- ja kontrollinõuded, sealhulgas:
a. Rakenduspartneri järelevalvesüsteemi kirjeldus, et anda aru kaasatud investeeringute kohta.
b. Rakenduspartneri selliste menetluste kirjeldus, millega tagatakse pettuste, korruptsiooni ja
huvide konfliktide ennetamine, avastamine ja kõrvaldamine.
c. Kohustus kontrollida iga tehingu puhul enne rahastamiskohustuse võtmist tehingu
rahastamiskõlblikkust kooskõlas rakenduslepingus sätestatud nõuetega;
d. Kohustus teha riskipõhiseid järelauditeid kooskõlas Invitalia S.p.A. auditikavaga. Nende
auditite käigus kontrollitakse järgmist:
i. kontrollisüsteemide tõhusus, sealhulgas pettuste, korruptsiooni ja huvide konflikti
avastamine;
ii. järgitud on põhimõtet „ei kahjusta oluliselt“, riigiabi eeskirju ja kliimaeesmärgi
nõudeid. ja
iii. järgitakse nõuet, et rahastu lõplikud toetusesaajad ei ole saanud samade kulude
katmiseks toetust muudest liidu vahenditest. Auditite käigus kontrollitakse ka
tehingute seaduslikkust ja kohaldatava rakenduskokkuleppe tingimuste täitmist.
5. Rakenduspartneri tehtavatele kliimainvesteeringutele esitatavad nõuded: vähemalt 660 000 000 eurot
taaste- ja vastupidavusrahastu investeeringutest rahastusse aitab kaasa kliimamuutustega seotud eesmärkide
saavutamisele kooskõlas taaste- ja vastupidavusrahastu määruse VI lisaga59.
suurenda jaamade jäätmetöötlusvõimsust ega pikenda nende kasutusiga; tõendid selle kohta tuleb esitada iga jaama
kohta eraldi. 59 Konkreetsete projektidega seotud lõplikud toetusesaajad peavad kliimaalase panuse arvutamiseks esitama iga
toetatava projekti kohta valitud sekkumisvaldkonna põhjenduse koos projekti kirjeldusega. Kliimaalase panuse
arvutamiseks esitavad lõplikud abisaajad, kes saavad toetust omakapitali, kvaasiomakapitali, äriühingu võlakirjade või
samaväärsete vahendite kaudu, mis ei ole suunatud konkreetsetele projektidele, valitud sekkumisvaldkonna (-
valdkondade) kohta põhjenduse. Rakenduspartner peab samuti esitama liikmesriigile poolaastaaruande iga
projekti/tegevuse rakendamise kohta.
220
Allinvesteering 2:
See allinvesteering koosneb avaliku sektori investeeringust rahastusse „Strateegiliste tarneahelate
konkurentsivõime ja vastupanuvõime“, et stimuleerida erainvesteeringuid ja parandada juurdepääsu
rahastamisele, et tugevdada tööstuslikke tarneahelaid.
Investeeringuga toetatakse projekte, mis on seotud peamiste strateegiliste väärtusahelatega, nagu
tööstusarengu programmid ja keskkonnakaitse arenguprogrammid.
Rahastu toimib tagastamatute toetuste, subsideeritud laenude ja intressitoetuste andmise kaudu otse
erasektorile.
Rahastut haldab rakenduspartnerina Invitalia S.p.A.
Rahastusse investeerimiseks allkirjastavad Itaalia ja Invitalia rakenduskokkuleppe, mis sisaldab järgmist:
1. Rahastu otsustusprotsessi kirjeldus: Rahastu lõplikud investeerimis- ja rahastamisotsused võtab vastu
investeerimiskomitee või muu asjakohane samaväärne juhtorgan ning need kiidetakse heaks
valitsusest sõltumatute liikmete häälteenamusega.
2. Seotud investeerimispoliitika põhinõuded, mis hõlmavad järgmist:
i) Finantstoote/finantstoodete ja rahastamiskõlblike lõplike abisaajate kirjeldus;
ii) Nõue, et kõik toetatavad investeeringud peavad olema majanduslikult elujõulised;
iii) Nõue järgida põhimõtet „ei kahjusta oluliselt“, nagu on sätestatud põhimõtte „ei kahjusta
oluliselt“ tehnilistes suunistes (2021/C58/01). Eelkõige jäetakse investeerimispoliitikaga
rahastamiskõlblikkuse alt välja järgmised tegevused ja varad: i) fossiilkütustega seotud tegevus
ja varad, sealhulgas allkasutus, ii) ELi heitkogustega kauplemise süsteemi60 (HKS) alla kuuluvad
tegevused ja varad, millega saavutatakse prognoositud kasvuhoonegaaside heide, mis ei ole
asjaomastest võrdlusalustest väiksem,61 iii) prügilate, jäätmepõletustehaste ja mehaanilis-
bioloogilise töötlemise jaamadega seotud tegevus62 ja varad63.
iv) Nõue, et rahastu lõplikud toetusesaajad ei saa samade kulude katmiseks toetust muudest liidu
vahenditest.
3. Rakenduslepinguga hõlmatud summa, rakenduspartneri tasude struktuur ja nõue reinvesteerida mis
tahes tagasisaadavad vahendid vastavalt rahastu investeerimispoliitikale.
4. Seire-, auditi- ja kontrollinõuded, sealhulgas:
a. Rakenduspartneri järelevalvesüsteemi kirjeldus, et anda aru kaasatud investeeringute kohta.
b. Rakenduspartneri selliste menetluste kirjeldus, millega tagatakse pettuste, korruptsiooni ja
huvide konfliktide ennetamine, avastamine ja kõrvaldamine.
60 Välja arvatud a) varad ja tegevused maagaasi kasutavas elektri- ja/või soojusenergia tootmises ning sellega seotud
ülekande- ja jaotustaristus, mis vastavad põhimõtte „ei kahjusta oluliselt“ tehniliste suuniste (2021/C58/01) III lisas
sätestatud tingimustele, ning b) alapunktis ii osutatud tegevused ja varad, mille puhul fossiilkütuste kasutamine on
fossiilkütustevabale käitamisele õigeaegseks üleminekuks ajutine ja tehniliselt vältimatu. 61 Kui toetatava tegevusega saavutatakse prognoositud kasvuhoonegaaside heide, mis ei ole asjaomastest võrdlusalustest
oluliselt väiksem, esitatakse selgitus selle kohta, miks see ei ole võimalik. Saastekvootide tasuta eraldamise
võrdlusalused saastekvootidega kauplemise süsteemi kohaldamisalasse kuuluvate tegevuste jaoks on sätestatud
komisjoni rakendusmääruses (EL) 2021/447. 62 Välistamist ei kohaldata meetme tegevuste suhtes, mis toimuvad üksnes ringlussevõetamatute ohtlike jäätmete
töötlemisega tegelevates jaamades, ega olemasolevate jaamade suhtes, kui meetme tegevuste eesmärk on suurendada
energiatõhusust, koguda heitgaase ladustamiseks või kasutamiseks või taaskasutada põletustuhas leiduvaid materjale,
tingimusel et need tegevused ei suurenda jaamade jäätmetöötlusvõimsust ega pikenda nende kasutusiga; tõendid selle
kohta tuleb esitada iga jaama kohta eraldi. 63 Välistamist ei kohaldata meetme tegevuste suhtes, mis toimuvad olemasolevates mehhaanilis-bioloogilise töötlemise
jaamades, kus nende tegevuste eesmärk on suurendada energiatõhusust või moderniseerida eraldatud jäätmete
ringlussevõttu biojäätmete kompostimiseks ja biojäätmete anaeroobseks lagundamiseks, tingimusel et need tegevused ei
suurenda jaamade jäätmetöötlusvõimsust ega pikenda nende kasutusiga; tõendid selle kohta tuleb esitada iga jaama
kohta eraldi.
221
c. Kohustus kontrollida iga tehingu puhul enne rahastamiskohustuse võtmist tehingu
rahastamiskõlblikkust kooskõlas rakenduslepingus sätestatud nõuetega;
d. Kohustus teha riskipõhiseid järelauditeid kooskõlas Invitalia erikaitseala auditikavaga.
Nende auditite käigus kontrollitakse järgmist:
i. kontrollisüsteemide tõhusus, sealhulgas pettuste, korruptsiooni ja huvide konflikti
avastamine;
ii. järgitud on põhimõtet „ei kahjusta oluliselt“, riigiabi eeskirju ja kliimaeesmärgi
nõudeid. ja
iii. järgitakse nõuet, et rahastu lõplikud toetusesaajad ei ole saanud samade kulude
katmiseks toetust muudest liidu vahenditest. Auditite käigus kontrollitakse ka
tehingute seaduslikkust ja kohaldatava rakenduskokkuleppe tingimuste täitmist.
Investeering 5.2 – Rahvusvahelise juhtpositsiooni arendamine vesiniku valdkonnas tööstuses ning
teadus- ja arendustegevuses
Selle investeeringu eesmärk on toetada vesiniku arendamist Itaalias. See investeering seisneb
elektrolüüsiseadmete tootmise projektide rahastamises.
Investeering 5.3 – Elektribusside rahvusvahelise, tööstusliku ning teadus- ja arendustegevuse alase
juhtpositsiooni arendamine
Selle investeeringuga toetatakse ligikaudu 45 projekti, mis võivad edendada bussitööstuse digi- ja rohepööret
elektrilisteks ja ühendatud bussideks. See investeering peaks toetama ka investeeringuid elektribussipargi
uuendamisse (ilma et see hõlmaks hübriidbusse).
Investeering 5.4 – omakapitalisüst rohepöörde fondi (GTF), mida haldab CDP Venture Capital SGR
Meetme eesmärk on toetada Itaalia majanduse kasvupotentsiaali, stimuleerides erainvesteeringuid,
parandades rohepöördes osalevate idufirmade juurdepääsu rahastamisele ja arendades riskikapitaliturgu
selles sektoris. Meede seisneb 250 000 000 euro suuruses omakapitalisüstis rohepöörde fondi, mida haldab
CDP Venture Capital SGR.
CDP Venture Capital SGR võtab vastu omakapitali kasutamise investeerimispoliitika. Investeerimispoliitika
sisaldab finantstoode(t)e kirjeldust koos rahastamiskõlblike lõplike abisaajate eeldatava liigiga, mida
omakapitalist eeldatavasti toetatakse, sealhulgas rakendamise eeldatavat 15-aastast ajakava ja maksimaalselt
13 % suurust haldustasu64. GTF tegutseb omakapitali, kvaasiomakapitali, võla või kvaasivõla otsese või
kaudse toetamise kaudu65. CDP Venture Capital SGR võtab omakapitali kasutamiseks vastu auditi- ja
kontrollisüsteemi, mida on kirjeldatud suunistes „Linee Guida per le attività di rendicontazione e controllo
dei Fondi DTF e GTF“. Investeerimispoliitikas nõutakse, et finantstoode (-tooted), mida omakapitaliga
toetatakse, vastaks olulise kahju ärahoidmise põhimõttele, nagu on sätestatud põhimõtte „ei kahjusta
oluliselt“ tehnilistes suunistes (2021/C58/01). Eelkõige idufirmade üldise toetamise korral jäetakse
investeerimispoliitikast välja äriühingud, kes keskenduvad peamiselt66 järgmistele sektoritele: i)
fossiilkütustel põhinev energiatootmine ja sellega seotud tegevus67; ii) energiamahukad ja/või suure CO2-
64 Eelkõige ei hõlma 13 % ülempiir teenitud huvi, GTFiga seotud tulemustasusid ega kõiki kolmandate isikute
vahenditega seotud kulusid ja haldustasusid. 65 Eelkõige otseinvesteeringute puhul tegutseb GTF omakapitali või kvaasiomakapitali toetuse andmise kaudu; kaudsete
investeeringute korral rahastab GTF kolmandate isikute fonde, mis toimivad, pakkudes vähemalt ühte järgmistest:
omakapital või kvaasiomakapital või võlainstrumendid või kvaasivõlainstrumendid.
66 Lõplikul abisaajal on „oluline fookus“ sektorile või äritegevusele, kui seda sektorit või tegevust peetakse lõpliku
abisaaja äritegevuse oluliseks osaks vastavalt seoses lõpliku abisaaja brutotulu, kasumi või kliendibaasiga. Piiratud
sektorist või tegevusest saadav brutotulu ei tohi mingil juhul ületada 50 % brutotulust.
67 Välja arvatud a) varad ja tegevused maagaasi kasutavas elektri- ja/või soojusenergia tootmises ning sellega seotud
ülekande- ja jaotustaristus, mis vastavad põhimõtte „ei kahjusta oluliselt“ tehniliste suuniste (2021/C58/01) III lisas
sätestatud tingimustele, ning b) alapunktis ii osutatud tegevused ja varad, mille puhul fossiilkütuste kasutamine on
fossiilkütustevabale käitamisele õigeaegseks üleminekuks ajutine ja tehniliselt vältimatu.
222
heitega tööstusharud68; iii) saastavate sõidukite tootmine, rentimine või müük69; iv) jäätmete kogumine,
töötlemine ja70 kõrvaldamine, v) tuumkütuse töötlemine, tuumaenergia tootmine. Lisaks nõutakse
investeerimispoliitikas vastavust asjakohastele ELi ja riiklikele keskkonnaalastele õigusaktidele.
68 Sealhulgas ELi heitkogustega kauplemise süsteemi (HKS) alla kuuluvad tegevused ja varad, millega saavutatakse
prognoositud kasvuhoonegaaside heide, mis ei ole asjaomastest võrdlusalustest väiksem. Kui toetatava tegevusega
saavutatakse prognoositud kasvuhoonegaaside heide, mis ei ole asjaomastest võrdlusalustest oluliselt väiksem,
esitatakse selgitus selle kohta, miks see ei ole võimalik. Saastekvootide tasuta eraldamise võrdlusalused
saastekvootidega kauplemise süsteemi kohaldamisalasse kuuluvate tegevuste jaoks on sätestatud komisjoni
rakendusmääruses (EL) 2021/447.
69 Saastavad sõidukid on määratletud heiteta sõidukitena.
70 Seda erandit ei kohaldata meetmete suhtes, mida võetakse tehastes, mis on ette nähtud üksnes ringlussevõetamatute
ohtlike jäätmete töötlemiseks, ja olemasolevates tehastes, kui käesoleva meetme kohaste meetmete eesmärk on
suurendada energiatõhusust, koguda heitgaase ladustamiseks või kasutamiseks või taaskasutada põletustuhast saadud
materjale, tingimusel et sellised käesoleva meetme kohased meetmed ei suurenda tehaste jäätmetöötlusvõimsust ega
pikenda nende kasutusiga; tõendid selle kohta tuleb esitada iga jaama kohta eraldi.
223
E.4. Laenu eesmärgid, sihid, näitajad ning seire ja rakendamise ajakava
S
järjekorran
umber
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
M2C2–5
Investeering 1.4
– Biometaani
arendamine
vastavalt
ringmajanduse
edendamise
kriteeriumidele
Eesmärk
Rakenduslepi
ng, lõplike
abisaajatega
sõlmitud
õiguslikud
lepingud ja
investeeringut
e
lõpuleviimine
Rakenduslepingu
jõustumine,
allkirjastatud
õiguslikud
kokkulepped ja
üleandmise tõend
PUUDUV
AD
PUUDUV
AD
PUUDUV
AD 2. kv 2026
Rakenduslepingu jõustumine.
Itaalia kannab GSE-le rahastu jaoks üle
2 236 020 000 eurot.
GSE peab olema sõlminud lõplike
toetusesaajatega seaduslikud toetuslepingud
summas, mis on vajalik, et kasutada 100 %
taaste- ja vastupidavusrahastu
investeeringust kavasse (võttes arvesse
haldustasusid).
M2C2–9
Investeering 2.1
– Arukate
võrkude
tugevdamine
Siht
Arukad
võrgud –
võrgu
võimsuse
suurendamine
taastuvenergi
a jaotamiseks
PUUDUVAD Number 0 1 000 4. kv 2024 Suurendada taastuvenergia jaotamise võrgu
võimsust vähemalt 1 000 MW võrra
M2C2–17
Investeering 3.4
– Vesinikukatsed
raudtee- ja
maanteetranspor
dis
Siht
Ehitatud
vesinikutankla
te arv
PUUDUVAD Number 0 29 2. kv 2026
Tehtud on tööd vähemalt kaheksa
vesinikupõhise raudteetankla ehitamiseks
vähemalt viiele raudteeliinile ja vähemalt 21
vesinikupõhise maanteetransporditankla
ehitamiseks.
M2C2–19 Investeering 3.5
– Vesinikualane
teadus- ja
Siht Vesinikualase
teadus- ja
arendustegev
PUUDUVAD Number 0 10 2. kv 2026 Teadusuuringute lõpetamise aruanded, mis
on väljastatud vähemalt kümne teadus- ja
arendusprojekti kohta järgmistes
224
S
järjekorran
umber
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
arendustegevus use projektide
arv
valdkondades;
a) Keskkonnahoidliku vesiniku tootmine
b) Vesiniku ladustamine, transport ja
muundamine derivaatideks ja e-kütusteks
c) Kütuseelemendid
d) Aruka vesinikupõhise taristu integreeritud
arukas haldamine
M2C2–24
Investeering 4.2
Kiirtranspordisüst
eemide
arendamine
Eesmärk
Kõigi
riigihankelepin
gute
sõlmimine
kiirete
massitranspor
disüsteemide
taristu
rajamiseks
Teade kõigi
riigihankelepingut
e sõlmimise kohta
PUUDUV
AD
PUUDUV
AD
PUUDUV
AD 4. kv 2023
Teade kõigi riigihankelepingute sõlmimise
kohta taristuprojektide ülesehitamiseks, nagu
on määratletud meetme kirjelduses.
M2C2–25
Investeering 4.2
Kiirtranspordisüst
eemide
arendamine
Eesmärk
Kõigi
riigihankelepin
gute
sõlmimine
heiteta
veeremi
ostmiseks ja
sekkumised
kiirtranspordis
Teade kõigi
riigihankelepingut
e sõlmimise kohta
PUUDUV
AD
PUUDUV
AD
PUUDUV
AD 3. kv 2024
Teade kõigi riigihankelepingute sõlmimise
kohta vähemalt 85 veeremiühiku ostmiseks
ja vähemalt viie sekkumise kohta
kiirtranspordisüsteemide taristu
ajakohastamiseks, nagu on määratletud
meetme kirjelduses.
225
S
järjekorran
umber
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
üsteemide
taristu
ajakohastamis
eks
M2C2–26
Investeering 4.2
Kiirtranspordisüst
eemide
arendamine
Eesmärk
Avalik taristu
ja veerem
kiireks
massitranspor
diks
Väljaantud
sertifikaadid
PUUDUV
AD
PUUDUV
AD
PUUDUV
AD 2. kv 2026
- Haldussertifikaadid, mis on välja antud vähemalt 186 km ühistransporditaristu kohta funktsionaalsetes linnapiirkondades.
- Tarnesertifikaat või vastuvõtmise kinnitus koos vastavussertifikaadiga vähemalt 311 heiteta veeremiühiku (trammi-, metroo-, trollibussi- ja bussiveerem) kohta kiireks massiliseks transpordiks funktsionaalsetes linnapiirkondades.
- Haldussertifikaadid, mis on välja antud vähemalt kümnele kiirtransporditaristu ajakohastamise meetmele, mis võivad hõlmata nende digiteerimist. Need sekkumised võivad hõlmata metroojaamade ja metrootaristu ajakohastamist, raudtee või trammi signaalimissüsteeme ning avalikke transiididepoosid.
Investeering ei hõlma selliste teede ehitamist
või ajakohastamist, mis jäävad väljapoole
sekkumise kohaldamisala, välja arvatud
juhul, kui need on heitevaba veeremi
226
S
järjekorran
umber
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
käitamist võimaldava taristu lahutamatud
osad.
M2C2–31
Investeering
4.4.3: Riikliku
tuletõrje juhtimise
alla kuuluva
laevastiku
uuendamine
Eesmärk
Kõigi riigi
tuletõrjemees
konna
koosseisu
uuendamise
riigihankelepin
gute
sõlmimine
Teade kõigi
lepingute
sõlmimise kohta
riikliku
tuletõrjeautopargi
uuendamiseks
PUUDUV
AD
PUUDUV
AD
EI
KOHALDA
TA
2. kv 2024 Teade kõigi riigihankelepingute sõlmimise
kohta riiklike tuletõrjeautode ostmiseks.
M2C2–32
Investeering
4.4.1:
Piirkondliku
ühistranspordi
bussipargi
tugevdamine
heiteta madala
põrandaga
bussidega
Eesmärk
Kõigi
riigihankelepin
gute
sõlmimine
piirkondliku
ühistranspordi
bussipargi
tugevdamisek
s heiteta ja
madala
põrandaga
bussidega
Teade kõigi
lepingute
sõlmimise kohta
PUUDUV
AD
PUUDUV
AD
PUUDUV
AD 4. kv 2023
Teade riigihankelepingute sõlmimise kohta
vähemalt 3 000 heiteta madala põrandaga
bussi ostmiseks.
M2C2–34
Investeering
4.4.1:
Piirkondliku
ühistranspordi
Siht
Registreeritud
heiteta
madala
põrandaga
PUUDUVAD Number 0 800 4. kv 2024
Vähemalt 800 heiteta madala põrandaga
bussi registreerimine, mis on hangitud
meetme M2C2–32 raames, et tugevdada
vastavat sõidukiparki.
227
S
järjekorran
umber
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
bussipargi
tugevdamine
heiteta madala
põrandaga
bussidega
busside arv
T1
M2C2–34a
Investeering
4.4.2:
Piirkondliku
ühistranspordi
raudteepargi
tugevdamine
heitevabade
rongide ja
universaalteenus
e abil
Siht Heitevabade
rongide arv PUUDUVAD Number 0 25 4. kv 2024
Vähemalt 25 heitevaba rongi
kohaletoimetamine.
M2C2–35
bis
Investeering
4.4.2:
Piirkondliku
ühistranspordi
raudteepargi
tugevdamine
heitevabade
rongide ja
universaalteenus
e abil
Siht Hangitud
rongide arv PUUDUVAD Number 25 118 2. kv 2026
Hankimine või vastuvõtmise kinnitus koos
vähemalt 118 heitevaba rongi
vastavusdeklaratsiooniga. Abikõlblikud
rongid on elektrirongid,
vesinikkütuseelemendiga rongid ja kuni 20
kaheliigilist rongi.
228
S
järjekorran
umber
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
M2C2–38a
Investeering 5.1.
Ökoloogilise
ülemineku ja
nullnetotehnoloo
gia
tootmissüsteemi
ning strateegiliste
tarneahelate
konkurentsivõime
ja vastupidavuse
toetamine
Eesmärk Rakenduskok
kulepe.
Rakenduskokkule
ppe jõustumine
PUUDUV
AD
PUUDUV
AD
PUUDUV
AD 4. kv 2024 Rakenduskokkuleppe jõustumine.
M2C2–54
Investeering 4.6
–
Diagnostikarongi
d
Siht Diagnostikaro
ngid PUUDUVAD Number 0 9 2. kv 2026
Vähemalt seitsme diagnostikarongi
hankimine. Vähemalt kahe diagnostikarongi
seadmed.
M2C2–39
Investeering 5.1
Ökoloogilise
ülemineku
tootmissüsteemi,
nullnetotehnoloo
gia ning
strateegiliste
tarneahelate
konkurentsivõime
ja vastupidavuse
toetamine
Eesmärk
Itaalia
Ettevõtlus- ja
Made in Italy
ministeerium
on viinud
lõpule
rahaliste
vahendite
ülekandmise
äriühingule
Invitalia S.p.A.
Üleviimistunnistus PUUDUV
AD
PUUDUV
AD
PUUDUV
AD 4. kv 2024 Itaalia kannab rahastu jaoks Invitaliasse üle
3 500 000 000 eurot.
229
S
järjekorran
umber
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
M2C2–40 Investeering 5.1.
Ökoloogilise
ülemineku ja
nullnetotehnoloo
gia
tootmissüsteemi
ning strateegiliste
tarneahelate
konkurentsivõime
ja vastupidavuse
toetamine
Eesmärk Rakenduslepi
ngu
muutmine,
lõplikele
toetusesaajat
ele toetuse
andmise otsus
ja
investeeringut
e
lõpuleviimine
Muudetud
rakenduslepingu
jõustumine,
lõplike abisaajate
lepingu sõlmimise
otsus ja
üleandmise tõend
PUUDUV
AD
0 100 2. kv 2026 Rakenduslepingu muudatus. Itaalia kannab
rahastu jaoks Invitaliasse üle 227 000 000
eurot.
Invitalia on teinud rahastamisotsuse
summas, mis on vajalik, et kasutada 100 %
taaste- ja vastupidavusrahastu
3 727 000 000 euro suurusest
investeeringust (võttes arvesse
haldustasusid). Vähemalt 660 miljonit eurot
sellest rahastusest aitab kaasa
kliimaeesmärkide saavutamisele, kasutades
taaste- ja vastupidavusrahastu määruse VI
lisas esitatud metoodikat.
Eelkõige:
–Allinvesteeringule 1 „Nullnetotehnoloogiad“
eraldatakse vähemalt 700 000 000 eurot;
–Taaste- ja vastupidavusrahastu ülejäänud
investeeringud eraldatakse 2.
allinvesteeringule „Strateegiliste
tarneahelate, sealhulgas pooljuhtide
projektide konkurentsivõime ja
vastupanuvõime“. Allinvesteeringu 2 raames
eraldatakse agrotööstus- ja
põllumajanduslikule toidutööstusele kuni
40 0000 000 eurot.
M2C2–42a Investeering 5.4 Eesmärk Omakapitalisü Üleviimistunnistus PUUDUV PUUDUV PUUDUV 4. kv 2024 Itaalia kannab GTFi üle 250 000 000 eurot.
230
S
järjekorran
umber
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
–
Omakapitalisüst
rohepöörde fondi
(GTF)
st rohepöörde
fondi
AD AD AD Lisaks peab investeerimispoliitika („Accordo Finanziario“) olema kooskõlas meetme kirjeldusega.
M2C2–43
Investeering 5.4:
Omakapitalisüst
rohepöörde fondi
(GTF)
Eesmärk Raporti
vastuvõtmine
Raporti
vastuvõtmine
PUUDUV
AD
PUUDUV
AD
PUUDUV
AD 2. kv 2026
Itaalia esitab aruande, milles kirjeldatakse
meetmeid, mida GTF on võtnud
investeerimispoliitika rakendamiseks,
sealhulgas meetmeid, mida on võetud
selliste finantstoodete rakendamiseks, mida
omakapital peaks toetama, ning meetmeid,
mida kavatsetakse võtta nende toodete
edasiseks rakendamiseks.
Aruandes märgitakse ka otsesel/kaudsel
viisil ja igasse finantstootesse investeeritud
summad.
Fondi määrust muudetakse tagamaks, et
fondi investeeringud on suunatud
keskkonnahoidlikele investeeringutele, mis
on kooskõlas sekkumisvaldkondadega,
millele on määruse (EL) 2021/241 VI lisa
kohaselt määratud 100 % kliimakoefitsient.
M2C2–44
Investeering 1.1
–
Põllumajanduslik
u päikeseenergia
süsteemide
Eesmärk
Kõigi
riigihankelepin
gute
sõlmimine
päikesepaneel
ide
Vastuvõtumäärust
e avaldamine
koos kõigi
riigihankelepingut
e sõlmimisega
(loovutamisega)
PUUDUV
AD
PUUDUV
AD
PUUDUV
AD 4. kv 2024
Vastuvõtumääruste avaldamine koos kõigi
riigihankelepingute sõlmimisega
(asutamislepingute sõlmimisega)
päikesepaneelide ja mõõtevahendite
paigaldamiseks põllumajandusega seotud
231
S
järjekorran
umber
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
arendamine paigaldamisek
s
põllumajandus
es
kasutatavates
se
päikeseenergi
asüsteemides
se
päikesepaneelide
paigaldamiseks
põllumajandusega
seotud
päikeseenergiasü
steemidesse
päikeseenergiasüsteemidesse.
M2C2–45
Investeering 1.1
–
Põllumajanduslik
u päikeseenergia
süsteemide
arendamine
Eesmärk
Rakenduslepi
ng, lõplike
abisaajatega
sõlmitud
õiguslikud
lepingud ja
investeeringut
e
lõpuleviimine
Rakenduslepingu
jõustumine,
allkirjastatud
õiguslepingud,
üleandmise tõend
PUUDUV
AD
PUUDUV
AD
PUUDUV
AD 2. kv 2026
Rakenduslepingu jõustumine.
Itaalia kannab GSEsse rahastu jaoks üle
999 000 000 eurot.
GSE peab olema sõlminud lõplike
toetusesaajatega seaduslikud toetuslepingud
summas, mis on vajalik, et kasutada 100 %
taaste- ja vastupidavusrahastu
investeeringust kavasse (võttes arvesse
haldustasusid).
M2C2–47
Investeering 1.2
– Taastuvate
energiaallikate
edendamine
energiakogukond
ade ja ühiselt
oma tarbeks
toodetud
Eesmärk
Rakenduslepi
ng, lõplike
abisaajatega
sõlmitud
õiguslikud
lepingud ja
investeeringut
e
Rakenduslepingu
jõustumine,
allkirjastatud
õiguslikud
kokkulepped ja
üleandmise tõend
PUUDUV
AD
PUUDUV
AD
PUUDUV
AD 2. kv 2026
Rakenduslepingu jõustumine.
Itaalia kannab GSE-le rahastu jaoks üle
1 041 500 000 eurot.
GSE peab olema sõlminud lõplike
toetusesaajatega õiguslike toetuste lepingud
summas, mis on vajalik, et kasutada
vähemalt 100 % taaste- ja
232
S
järjekorran
umber
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
taastuvenergia
tarbijate jaoks
lõpuleviimine vastupidavusrahastu investeeringust
kavasse (võttes arvesse haldustasusid).
M2C2–48
Investeering 3.1
– Vesiniku
tootmine
mahajäetud
tööstusaladel
(Hydrogen
Valleys)
Eesmärk
Kõigi selliste
riigihangete
sõlmimine,
mis käsitlevad
vesiniku
tootmise
projekte
mahajäetud
tööstuspiirkon
dades
asuvates
keskustes
Teade kõigi
riigihankelepingut
e sõlmimise kohta
vesiniku
tootmiseks
mahajäetud
tööstuspiirkondad
es asuvates
keskustes
PUUDUV
AD
PUUDUV
AD
PUUDUV
AD 1. kv 2023
Toetuste andmine vesiniku tootmise
projektidele mahajäetud tööstuspiirkondades
asuvates keskustes. Rahastatakse
saastevaba vesiniku tootmist vähem kui 3
CO2 ekvivalenttonni/tH2, et saavutada CO2
heite vähendamisel parim tulemus. Meede
toetab vesiniku tootmist elektrolüüsi teel,
kasutades direktiivis (EL) 2018/2001
(taastuvenergia direktiiv) määratletud
taastuvaid energiaallikaid, või võrguelektrit.
M2C2–49
Investeering 3.1
– Vesiniku
tootmine
mahajäetud
tööstusaladel
(Hydrogen
Valleys)
Siht
Paigaldatud
elektrolüüsise
admed
PUUDUVAD Number 0 10 2. kv 2026
Kümne vesinikuorgude projekti raames
paigaldatakse 10 elektrolüüsiseadet, millest
igaühe võimsus on vähemalt 1 MW.
Võrguühendust vajavatele
elektrolüüsiseadmetele antakse välja
liitumiskulude hinnangud, mille arendaja on
heaks kiitnud või mille eest ta on tasunud.
M2C2–50
Investeering 3.2
– Vesiniku
kasutamine
tööstuses, kus
heidet on raske
Eesmärk
Kokkulepe
edendada
üleminekut
metaanilt
saastevabale
Lepingu
allkirjastamine
PUUDUV
AD
PUUDUV
AD
PUUDUV
AD 1. kv 2023
Valitud projektiomanikega sõlmitava lepingu
allkirjastamine, et edendada üleminekut
metaanilt saastevabale vesinikule. Projektid
on osaliselt pühendatud väljatöötatavale
teadus- ja arendustegevuse ning
233
S
järjekorran
umber
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
vähendada vesinikule innovatsiooni protsessile ning osaliselt
vesiniku abil tööstusliku prototüübi
väljatöötamisele ja katsetamisele. Selle
meetmega toetatakse elektrolüüsil põhinevat
vesinikutootmist, kasutades direktiivis (EL)
2018/2001 (taastuvenergia direktiiv)
määratletud taastuvaid energiaallikaid või
võrguelektrit.
M2C2–52 Investeering 5.2
– Vesinik Eesmärk
Elektrolüüsise
admete
tootmine
Teade kõigi
riigihankelepingut
e avaldamise
kohta
PUUDUV
AD
PUUDUV
AD
PUUDUV
AD 2. kv 2022
Lepingu sõlmimine elektrolüüsiseadmete
tootmiseks mõeldud tööstusrajatise
ehitamiseks.
M2C2–53 Investeering 5.2
– Vesinik Siht
Ehitatud
tööstusettevõt
e
(tööstusettevõ
tted)
PUUDUVAD Number 0 1 2. kv 2026
Tehtud on tööd vähemalt ühe
tööstusettevõtte ehitamiseks
elektrolüüsiseadmete või moodulvirna
tootmiseks. Tehase (tehaste) summaarne
tootmisvõimsus peab olema vähemalt
890 MW aastas.
234
F. KONTROLL 2 – Energiatõhusus ja hoonete ümberkvalifitseerimine
Energiatõhusus on selle kolme põhisamba vahel jaotatud komponendi nurgakivi.
• Esimene sammas on ajutise stiimuli kehtestamine erakinnisvara energiatõhusaks ja
maavärinakindlaks renoveerimiseks, mis seisneb sekkumisega seotud kulude mahaarvamises
maksudest. Abikõlblikud sekkumised on need, mis suurendavad eluruumi energiatõhusust
vähemalt kahe energiamärgise kategooria võrra, saavutades energiatarbimise keskmise
paranemise üle 30 %.
• Selle komponendi teine sammas on riigikoolide ja kohtunike tsitadellide tõhususe ja ohutuse
parandamine.
• Kolmanda samba eesmärk on stimuleerida tõhusate kaugküttevõrkude ehitamist ja laiendamist
linnapiirkondades.
Lisaks on tehtud mitmeid reforme, et lihtsustada ja kiirendada hoonete energiatõhususe parandamisele
suunatud projektide rakendamist.
Eeldatakse, et see komponent aitab oluliselt kaasa Itaalia 2030. aasta kliima- ja energiaeesmärkide
saavutamisele, kuna tsiviilsektor vastutab peaaegu poole kogu energiatarbimise eest Itaalias. Enamik
hooneid ehitati enne energiasäästu kriteeriumide vastuvõtmist ja vastavate õigusaktide jõustumist ning
seega on energiatõhususe ja seismiliste riskidega kohanemise vajadused märkimisväärsed.
See komponent on osa 2020. aasta riigipõhisest soovitusest nr 3, millega nõukogu soovitas Itaalial
võtta meetmeid, et suunata investeeringud rohe- ja digipöördesse, eelkõige [...] veemajandusse ja
tugevdatud digitaristusse, et tagada oluliste teenuste osutamine. Samuti käsitletakse selles 2019. aasta
riigipõhiste soovituste nr 3 („Investeeringutega seotud majanduspoliitika suunamine taristu
kvaliteedile, võttes arvesse piirkondlikke erinevusi“) osi. [...] ning parandada avaliku halduse
tulemuslikkust, kiirendades digitaliseerimist ning suurendades kohalike avalike teenuste tõhusust ja
kvaliteeti).
Lähtudes meetmete kirjeldusest taaste- ja vastupidavuskavas ja võttes arvesse põhimõtte „Ei kahjusta
oluliselt“ tehniliste suuniste (2021/C58/01) kohaseid leevendavaid samme, mis kavas on sätestatud,
võib eeldada, et ükski selle komponendi meede ei kahjusta määruse (EL) 2020/852 artikli 17
tähenduses oluliselt keskkonnaeesmärke.
F.1. Tagastamatu rahalise toetusega seotud reformide ja investeeringute kirjeldus
Investeering 2.1: Energiatõhususe ökoboonuse tugevdamine
Meetme eesmärk on toetada eluhoonete energiatõhusaks renoveerimist. Meede seisneb toetuse
andmises teatavatele organisatsioonide ja kodumajapidamiste kategooriatele maksuvähenduse vormis
või alternatiivina maksuvähenduse vahendile rahastamisvahendite vormis (nn kreeditkorraldus ja arve
allahindlus).
Reform 1.1 – Energiatõhususmeetmete menetluste lihtsustamine ja kiirendamine
Reformi eesmärk on lihtsustada ja kiirendada energiatõhususega seotud sekkumiste rakendamise
menetlusi. See koosneb neljast peamisest meetmest:
• Hoonete energiatõhususe riikliku portaali käivitamine: Portaal toetab kodanikke ja ettevõtjaid
energiatõhususe projektide juhtimisel ning on otsustajate jaoks lihtne teabeallikas. See sisaldab
teavet riigi hoonefondi energiatõhususe kohta, mis peaks aitama ettevõtetel ja kodanikel teha
otsuseid oma kinnisvara energiatõhususe parandamise kohta. Luuakse ühtne kontaktpunkt, et
pakkuda kodanikele ja ettevõtjatele abi ja kogu kasulikku teavet seoses hoonete
energiakaardistamise, valdkondlike eeskirjade järgimise, tõhususe potentsiaali hindamise ja
tegevusprioriteetide valimisega, sealhulgas etapiviisilised ümberehituskavad, selleks kõige
sobivamate müügiedendusvahendite valimine ja kutseoskuste koolitus.
235
• Tsiviilsektorile suunatud teabe- ja koolituskava tegevuste tugevdamine – Teavitus- ja
koolituskavas võetakse arvesse vajadust töötada välja nii konkreetsed algatused, mille eesmärk on
täita eluasemesektori lõppkasutajate teabelünk, kui ka asjakohane koolitus stiimulite ja kõige
tõhusamate sekkumiste kohta energiateenuseid pakkuvatele ettevõtetele, kes viivad ellu
sekkumisi, ja kondomiiniumihalduritele. Kava väljatöötamisel võetakse arvesse Superbonuse
meetmest tulenevaid vajadusi, et maksimeerida selle tulemuslikkust ja panna alus püsivale
tõhususkultuurile ehituses.
• Riikliku energiatõhususe fondi ajakohastamine ja tugevdamine: Riikliku energiatõhususe
fondi loomist ja haldamist käsitlevate määruste läbivaatamisega (seadusandliku dekreedi
102/2014 artikkel 15 ja 22. detsembri 2017. aasta ministeeriumidevaheline dekreet) jõustuvad
muudatused, et edendada olemasolevate ressursside tõhustamist ja ulatuslikumat kasutamist.
• Avaliku sektori arengu keskse programmi EPAC raames rahastatavate projektide rakendusetapi
kiirendamine: Viiakse läbi õiguslik läbivaatamine, mille eesmärk on edendada keskvalitsuse
hoonete ümberkvalifitseerimise programmile (PREPAC) eraldatud vahendite tõhusamat
haldamist.
236
F.2. Tagastamatu rahalise toetuse eesmärgid, sihid, näitajad ning seire ja rakendamise ajakava
Järjekorra- number
Seotud Meede (reform või
investeering) Eesmärk/siht Nimetus
Kvalitatiivsed näitajad
(eesmärkide puhul)
Kvantitatiivsed näitajad (sihtide puhul) Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse naarium
Eesmärk Nõuded Aasta
M2C3–1
Investeering 2.1 – Energiatõhususe
ökoboonuse tugevdamine
Eesmärk Superbonuse pikenduse
jõustumine
Õigusakti(de) jõustumisele viitav
säte PUUDUVAD
PUUDUVA D
PUUDUVAD 4. kv 2021
Õigusaktiga (õigusaktidega) pikendatakse Ecobonuse ja ismabonuse soodustusi kondomiiniumite puhul kuni 31. detsembrini 2022 ja sotsiaaleluruumide puhul kuni 30. juunini 2023.
M2C3–2
Investeering 2.1 – Energiatõhususe
ökoboonuse tugevdamine
Siht Hoonete renoveerimine
Superbonus T1 PUUDUVAD Number 0 17 000 000 2. kv 2023
Hoonete täielik renoveerimine (vähemalt 17 000 000 ruutmeetrit, mis annab primaarenergia säästu vähemalt 40 % ja suurendab energiamärgisel vähemalt kahte kategooriat).
M2C3–3
Investeering 2.1 – Energiatõhususe
ökoboonuse tugevdamine
Siht Hoonete renoveerimine
Superbonus T2 PUUDUVAD Number 17 000 000 35 800 000 4. kv 2025
Väljastatakse sertifikaadid („asseverazioni“), mis tõendavad hoonete renoveerimist vähemalt 35 800 000 ruutmeetri ulatuses, mille tulemuseks on vähemalt 40 % primaarenergia sääst, mis suurendab vähemalt kahte energiatõhususe sertifikaadi kategooriat (energiatõhususe sertifikaat, nagu on määratletud dekreedis 63/2013). Kui olemasolevate ebatõhusate gaasi-, söe- ja naftapõhiste katelde asemele paigaldatakse gaasikondensatsioonikatlad, peab nende tõhusus olema A. Gaasikondensatsioonikatelde paigaldamise kulud moodustavad kõige rohkem 20 % renoveerimisprogrammi kogukuludest. Sekkumistega saavutatud üldine hinnanguline energiasääst on vähemalt 191 Ktoe.
237
Järjekorra- number
Seotud Meede (reform või
investeering) Eesmärk/siht Nimetus
Kvalitatiivsed näitajad
(eesmärkide puhul)
Kvantitatiivsed näitajad (sihtide puhul) Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse naarium
Eesmärk Nõuded Aasta
M2C3–4
Reform 1.1: Energiatõhususega seotud sekkumiste
menetluste lihtsustamine ja
kiirendamine
Eesmärk
Energiatõhususega seotud sekkumiste
menetluste lihtsustamine ja kiirendamine
Õigusakti(de) jõustumisele viitav
säte PUUDUVAD
PUUDUVA D
PUUDUVAD 2. kv 2022
Õigusakt(id) lihtsustab (lihtsustavad) ja kiirendab (kiirendavad) energiatõhususega seotud sekkumismenetlusi järgmiselt:
• Hoonete energiatõhususe riikliku portaali
käivitamine
• Tsiviilsektorile suunatud teabe- ja
koolituskava tegevuse tugevdamine
• Riikliku energiatõhususe fondi
ajakohastamine ja tugevdamine
• PREPAC-programmist rahastatavate
projektide rakendusetapi kiirendamine
238
F.3. Laenuga seotud reformide ja investeeringute kirjeldus
Investeering 1.1: Uute koolide ehitamine hoonete asendamise teel
Meetme eesmärk on luua tänapäevased ja jätkusuutlikud koolistruktuurid, eelkõige vähendades
energiatarbimist ja suurendades seismilist ohutust. Meede hõlmab uute koolide ehitamist.
Investeering 1.2 – Osaliselt või täielikult õigusemõistmises kasutatava avaliku sektori kinnisvara
ümberkvalifitseerimine
Meetme eesmärk on osaliselt või täielikult õigusemõistmiseks kasutatavate hoonete ümberkvalifitseerimine
ja moderniseerimine. Meede hõlmab renoveerimis- ja rekvalifitseerimistöid mitmes Itaalia omavalitsuses
asuvas kinnisvaras, sealhulgas, kuid mitte ainult, energiatõhususega seotud sekkumisi.
Investeering 3.1: Tõhusa kaugkütte edendamine
Meetme eesmärk on laiendada tõhusa kaugkütte kasutamist, mis põhineb taastuvatest energiaallikatest,
heitsoojusest või suure võimsusega käitistes koostoodetud soojuse jaotamisel. Meede seisneb uute
kaugküttevõrkude ehitamise või olemasolevate laiendamisega seotud projektide rahastamises.
239
F.4. Laenu eesmärgid, sihid, näitajad ning seire ja rakendamise ajakava
Järjekorra- number
Seotud Meede (reform või
investeering) Eesmärk/siht Nimetus
Kvalitatiivsed näitajad
(eesmärkide puhul)
Kvantitatiivsed näitajad (sihtide puhul) Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse naarium
Eesmärk Nõuded Aasta
M2C3–5
Investeering 1.1: Uute koolide
ehitamine hoonete asendamise teel
Eesmärk
Kõigi riigihankelepingute sõlmimine uute koolide ehitamiseks hoonete
väljavahetamise teel, et ajakohastada
koolihoonete energiat, pärast avalikku hankemenetlust
Teade kõigi riigihankelepingute
sõlmimise kohta avaliku
pakkumismenetluse teel
PUUDUVAD PUUDUVA
D PUUDUVAD 3. kv 2023
Teade kõigi selliste riigihankelepingute sõlmimise kohta, mis on sõlmitud kohalike omavalitsuste poolt ametlikult vormistatud rahastamiskõlblike uute koolide hoonete asendamiseks, mille kogupindala on vähemalt 400 000 ruutmeetrit
M2C3–6
Investeering 1.1: Uute koolide
ehitamine hoonete asendamise teel
Siht Uute koolide ehitamine PUUDUVAD Number 0 166 2. kv 2026
Ehitatakse vähemalt 166 uut kooli. 166 uue kooli primaarenergia tarbimine peab olema vähemalt 20 % väiksem kui liginullenergiahoonete nõue.
M2C3–7
Investeering 1.2 – Hoonete ehitamine,
kinnisvara ümberkvalifitseerimin
e ja tugevdamine õigusemõistmise
käigus
Eesmärk
Kõigi uute hoonete ehitamise,
ümberkvalifitseerimise ja õigusemõistmise
kinnisvara tugevdamise riigihankelepingute sõlmimisele kirjutab
avaliku sektori hankija alla pärast avalikku
hankemenetlust.
Teade kõigi riigihankelepingute
sõlmimise kohta avaliku
pakkumismenetluse teel
PUUDUVAD PUUDUVA
D PUUDUVAD 4. kv 2023
Teade kõigi riigihankelepingute sõlmimise kohta, mis käsitlevad hoonete ehitamist, ümberkvalifitseerimist ja kinnisvara tugevdamist õigusemõistmise eesmärgil.
M2C3–8
Investeering 1.2 – Osaliselt või täielikult
õigusemõistmises kasutatava avaliku sektori kinnisvara
ümberkvalifitseerimin e
Siht Tööd vähemalt 289000
ruutmeetri avaliku sektori kinnisvaraga
PUUDUVAD Number 0 289 000 2. kv 2026
Väljastatakse tõendid tööde lõpetamise kohta vähemalt 289 000 ruutmeetrile avalikule kinnisvarale, mida kasutatakse osaliselt või täielikult õigusemõistmiseks.
240
Järjekorra- number
Seotud Meede (reform või
investeering) Eesmärk/siht Nimetus
Kvalitatiivsed näitajad
(eesmärkide puhul)
Kvantitatiivsed näitajad (sihtide puhul) Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse naarium
Eesmärk Nõuded Aasta
M2C3–9 Investeering 3.1:
Tõhusa kaugkütte edendamine
Eesmärk
Küttevõrkude täiustamise lepingud sõlmib ökoloogilise
ülemineku ministeerium pärast avalikku
hankemenetlust.
Teade kõigi riigihankelepingute
sõlmimise kohta pärast avalikku
pakkumismenetlust
PUUDUVAD PUUDUVA
D PUUDUVAD 4. kv 2022
Kõigi riigihankelepingute sõlmimine uute kaugküttevõrkude ehitamiseks või olemasolevate kaugküttevõrkude laiendamiseks, mis peaks hõlmama energiatarbimise vähendamise nõuet. Lepingute sõlmimine projektidega, mis on välja valitud konkurentsipõhiste projektikonkursside alusel kooskõlas põhimõtte „ei kahjusta oluliselt“ tehniliste suunistega (2021/C58/01), kasutades välistamisnimekirja ning nõuet järgida asjakohaseid ELi ja riiklikke keskkonnaalaseid õigusakte.
M2C3–10 Investeering 3.1:
Tõhusa kaugkütte edendamine
Siht
Kaugküttevõrkude ehitamine või laiendamine
energiatarbimise vähendamiseks
PUUDUVAD KTOE 0 30 2. kv 2026
Välja antud sõltumatu(te) inseneri(de) aruanne
(aruanded), milles tõendatakse, et on võetud
meetmeid uute kaugküttevõrkude ehitamiseks või
olemasolevate laiendamiseks, mis võimaldab
vähendada energiatarbimist vähemalt 30 KTOE võrra
aastas.
Investeering peab vastama määruse 241/2021/EL
(taaste- ja vastupidavusrahastu kohta) VI lisa
joonealuses märkuses 9 sätestatud tingimustele.
Toetuse saamiseks kasutavad kaugküttesüsteemid peamise soojusallikana taastuvatest energiaallikatest, heitsoojusest või suure võimsusega käitistes koostoodetud soojust. Fossiilkütuseid kasutatakse üksnes varukütusena.
241
G. KONTROLL 2 – Territoriaalne planeerimine ja veevarud
Itaalia taaste- ja vastupidavuskava selle komponendi eesmärk on kõrvaldada mitu pikaajalist puudust,
mis on seotud veevarude majandamise ja hüdrogeoloogiliste riskidega Itaalias, ning võtta vastu mitu
meedet, mille eesmärk on säilitada elurikkus. See tuleb saavutada reformide ja investeeringute
märkimisväärse ja tasakaalustatud kombineerimise kaudu nendes eri mõõtmetes.
Reformide poolel pakutakse komponendis välja meetmete kogum, mille peamine eesmärk on
parandada veevarude majandamise tõhusust, vähendades sektori killustatust, kehtestades asjakohase
hinnapoliitika ja mitu stiimulit reoveekäitlusega seotud olemasolevate probleemide lahendamiseks.
Selle komponendi reformid hõlmavad ka meetmeid veetaristuga ning hüdroloogiliste riskide juhtimise
ja vähendamisega seotud projektide kavandamise ja rakendamise lihtsustamiseks.
Selle komponendiga seotud investeeringud aitavad leevendada ja paremini juhtida hüdrogeoloogilist
riski Itaalias nii ennetamise kui ka kohanemise seisukohast ning nende eesmärk on muuta veega
seotud taristu vastupidavamaks. Lisaks on nende eesmärk märkimisväärselt parandada veevarude
majandamist reovee parema käitlemise ja veelekete märkimisväärse vähendamise kaudu, sealhulgas
põllumajandussektoris. Investeeringutega tugevdatakse nende sektorite digitaliseerimist ning
muudetakse need energiatõhusamaks ja kliimamuutustega paremini kohandatuks. See komponent
hõlmab ka meetmeid, mille eesmärk on säilitada elurikkust ja rohealasid kooskõlas ELi elurikkuse
strateegiaga aastani 2030.
See komponent on osa 2020. aasta riigipõhisest soovitusest nr 3, millega Euroopa Liidu Nõukogu
soovitas Itaalial võtta meetmeid, et suunata investeeringud rohe- ja digipöördesse, eelkõige [...]
veemajandusse ja tugevdatud digitaristusse, et tagada oluliste teenuste osutamine. Samuti käsitletakse
selles 2019. aasta riigipõhise soovituse nr 3 („Investeeringutega seotud majanduspoliitika suunamine
taristu kvaliteedile, võttes arvesse piirkondlikke erinevusi“) osi. [...] ning parandada avaliku halduse
tulemuslikkust, kiirendades digitaliseerimist ning suurendades kohalike avalike teenuste tõhusust ja
kvaliteeti).
Lähtudes meetmete kirjeldusest taaste- ja vastupidavuskavas ja võttes arvesse põhimõtte „Ei kahjusta
oluliselt“ tehniliste suuniste (2021/C58/01) kohaseid leevendavaid samme, mis kavas on sätestatud,
võib eeldada, et ükski selle komponendi meede ei kahjusta määruse (EL) 2020/852 artikli 17
tähenduses oluliselt keskkonnaeesmärke.
G.1. Tagastamatu rahalise toetusega seotud reformide ja investeeringute kirjeldus
Reform 2.1 – Hüdrogeoloogilise ebastabiilsuse vastaste meetmete rakendamise korra
lihtsustamine ja kiirendamine
Reformi eesmärk on kõrvaldada olemasolevad puudused hüdrogeoloogiliste riskide juhtimises,
millele juhtis tähelepanu Itaalia kontrollikoda. See hõlmab kõnealuse valdkonna projektide
rakendamise menetluste lihtsustamist ja kiirendamist, sealhulgas iga etapi maksimumtähtaegade
kehtestamist; prioriseerida sekkumisi kooskõlas riikliku riskihindamisega ja otsuse 1313/2013/EL
artikliga 6 ning riskijuhtimissuutlikkuse hindamise ja olulise kahju ärahoidmise põhimõttega;
koostada kava nende projektide rakendamise eest vastutavate üksuste haldussuutlikkuse
suurendamiseks ja tugevdada koordineerimist erinevate asjaomaste valitsustasandite vahel, sealhulgas
teabevoogude ühtlustamise kaudu.
Reform 2 – Õigusraamistiku reform vee paremaks majandamiseks ja säästvaks kasutamiseks
Reformi eesmärk on lahendada Itaalia veesektori pikaajalised probleemid, mis kajastuvad paljudes
käimasolevates rikkumismenetlustes seoses nõukogu direktiivi 91/271/EMÜ mittejärgimisega, sektori
liigses killustumises ning piisavate stiimulite ja hinnapoliitika puudumises. Kavandatud meetmed
peaksid märkimisväärselt vähendama sektori killustatust, vähendades ettevõtjate arvu ja soodustades
mastaabisäästu, luues stiimulid veelekete ja liigse veetarbimise vähendamiseks põllumajandussektoris
ning kehtestades asjakohase hinnapoliitika vee säästvamaks tarbimiseks.
242
Campania, Calabria, Molise ja Sitsiilia piirkondadega allkirjastatakse vastastikuse mõistmise
memorandumid, et vähendada veevarustusteenuseid osutavate ettevõtjate arvu killustatust.
Vastastikuse mõistmise memorandumis seatakse eesmärgid seoses kohalike omavalitsuste asutuste
loomisega, ettevõtjate arvu vähendamisega ja mastaabisäästu saavutamisega, et luua kahe aasta
jooksul pärast vastastikuse mõistmise memorandumi allkirjastamist vähemalt iga 40000 elaniku kohta
üks ettevõtja.
Reform 4.2 „Meetmed integreeritud veeteenuste täieliku juhtimissuutlikkuse tagamiseks“
Reformi eesmärk on tegeleda veevarude majandamise peamiste probleemidega ja muuta süsteem
tõhusamaks.
Süsteem peaks vähendama ettevõtjate arvu praegust killustatust, mis praegu takistab veevarude
tõhusat kasutamist riigi mõnes osas. Reformiga loodetakse luua ka õiged stiimulid veevarude
paremaks kasutamiseks põllumajandussektoris, kehtestada karistuste süsteem vee ebaseadusliku
ammutamise eest ning kehtestada hinnasüsteem, mis kajastab paremini ja on rohkem kooskõlas
põhimõttega „saastaja maksab“, vältides samal ajal olemasolevate niisutussüsteemide laiendamist.
Meetmed võetakse vastu koostöös piirkondadega, kus veevarude majandamine on praegu
problemaatilisem.
Investeering 3.2 – rahvusparkide ja merekaitsealade digitaliseerimine
Meetme eesmärk on ajakohastada ja digiteerida rahvusparkide ja merekaitsealade toimimisega seotud
menetlusi. Meede hõlmab külastajatele osutatavaid digiteenuseid ning sekkumist looduskaitsesse ja
loodusvarade seiresse.
Investeering 4.2. Veejaotusvõrkude kadude vähendamine, sealhulgas võrkude digiteerimine ja
seire
Selle investeeringu eesmärk on vähendada joogivee kadu. Meede seisneb veejaotusvõrkude
eristamises.
Investeering 3.1: Linna- ja linnalähedaste metsade kaitse ja edendamine
Meetme eesmärk on kaitsta haljasalasid ja suurendada nende arvu, et säilitada ja suurendada
elurikkust ning parandada nende alade elanike elukvaliteeti. Meede seisneb
kultiveerimismaterjali (seemned või taimed) istutamises vähemalt 4 500 000 puule või
põõsale ning vähemalt 3 500 000 puu või põõsa ümberistutamises Itaalia 13
suurlinnapiirkonnas.
243
G.2. Tagastamatu rahalise toetuse eesmärgid, sihid, näitajad ning seire ja rakendamise ajakava
Järjekorra-
number
Seotud meede (reform
või investeering) Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
M2C4–1
Reform 2.1.
Hüdrogeoloogilise
ebastabiilsuse vastaste
meetmete rakendamise
menetluste lihtsustamine
ja kiirendamine
Eesmärk
Hüdroloogiliste riskide
parema juhtimise
õigusraamistiku
lihtsustamise
jõustumine
Asjaomas(t)e
õigusakti(de)
jõustumisele viitav
säte
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2022
Uues õigusraamistikus tuleb
(vähemalt):
- Seadma prioriteediks
ennetavad sekkumised kooskõlas
riikliku riskihindamise ja otsuse
1313/2013/EL artikliga 6 ning
riskijuhtimissuutlikkuse hindamise
ja olulise kahju ärahoidmise
põhimõttega;
- Kiirendada projektide
kavandamise menetlusi ja
kehtestada üldpõhimõtted
projektide rakendamise ja
rahastamise menetluste ning
hüdroloogilise riski projektide
lihtsustamiseks;
- Ühtlustada ja ühtlustada
teabevooge, et vähendada liiasust
riigi eri infosüsteemide vahelises
aruandluses, ning töötada välja
näitajate süsteem hüdroloogiliste
riskide paremaks
kindlakstegemiseks kooskõlas
Itaalia kontrollikoja soovitustega.
244
Järjekorra-
number
Seotud meede (reform
või investeering) Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
- Tugevdada sekkumiste
koordineerimist eri
valitsustasandite vahel kooskõlas
Itaalia kontrollikoja soovitustega;
- Luua kooskõlas Itaalia
kontrollikoja soovitustega
intsidentide ühised andmebaasid
(dissesto);
- Kehtestada iga etapi jaoks
maksimaalne ajakava.
- Koostada kava asjaomaste
üksuste suutlikkuse
suurendamiseks.
M2C4–2
Reform 4.2 „Meetmed
integreeritud veeteenuste
täieliku
juhtimissuutlikkuse
tagamiseks“
Eesmärk
Integreeritud
veeteenuste täieliku
juhtimissuutlikkuse
tagamise reformi
jõustumine
Asjaomas(t)e
õigusakti(de)
jõustumisele viitav
säte
PUUDUVAD PUUDUVAD PUUDUVAD 3. kv 2022
Üldine seadus/üldised määrused
veeteenuste kohta nende
säästvaks kasutamiseks ja
veetaristusse investeerimise
stimuleerimiseks, mis vähemalt:
- Vähendada üksuste killustatust
eeskirjade ja
koondamismehhanismide abil, et
motiveerida praegu autonoomseid
käitajaid integreerima end kogu
Ambito Territoriale Ottimale
ainulaadsesse käitajasse;
245
Järjekorra-
number
Seotud meede (reform
või investeering) Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
- Pakkuda stiimuleid vee
säästvaks kasutamiseks
põllumajanduses, eelkõige selleks,
et toetada ühise veekasutuse
seiresüsteemi (SIGRIAN)
kasutamist kollektiivseks ja
omatarbeks niisutamiseks;
- Kehtestada reguleeritud
hindade süsteem, milles võetakse
asjakohaselt arvesse
keskkonnaressursside kasutamist
ja saastet kooskõlas põhimõttega,
et saastaja maksab
M2C4–3
Reform 4.2 „Meetmed
integreeritud veeteenuste
täieliku
juhtimissuutlikkuse
tagamiseks“
Eesmärk
Vee parema
majandamise ja säästva
kasutamise
õigusraamistiku reform
Vastastikuse
mõistmise
memorandumite
jõustumine
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2021
Vastastikuse mõistmise
memorandumi allkirjastamine
ökoloogilise ülemineku
ministeeriumi poolt Campania,
Calabria, Molise ja Sitsiilia
piirkondadega, et vähendada
veevarustusteenuseid osutavate
ettevõtjate killustatust.
Vastastikuse mõistmise
memorandumis tuleks seada
eesmärgid seoses kohalike
omavalitsuste loomisega,
246
Järjekorra-
number
Seotud meede (reform
või investeering) Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
ettevõtjate arvu vähendamisega ja
mastaabisäästu saavutamisega, et
luua üksikettevõtjad vähemalt iga
40 000 elaniku kohta.
M2C4–4
Reform 4.2 „Meetmed
integreeritud veeteenuste
täieliku
juhtimissuutlikkuse
tagamiseks“
Eesmärk
Niisutamise uue
õigusraamistiku
jõustumine
Asjakohase õigusakti
jõustumisele viitav
säte
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2022
Muudetud õigusraamistik sisaldab
vähemalt järgmist:
–Kehtestada karistuste süsteem
vee ebaseadusliku ammutamise
eest
Nõuda veepoliitika raamdirektiivi
artikli 4 lõike 7 kohast
mõjuhinnangut, et hinnata
(võimalik, et kumulatiivset) mõju
kõigile potentsiaalselt mõjutatud
veekogudele.
–Tagada, et olemasoleva
niisutussüsteemi laiendamist
(sealhulgas vee suurema
kasutamise kaudu, st mitte ainult
füüsilise laiendamise kaudu) isegi
tõhusamate meetodite abil
välditakse, kui asjaomaste
veekogude (pinna- või põhjavesi)
seisund on või prognoositakse
(kliimamuutuste süvenemise
247
Järjekorra-
number
Seotud meede (reform
või investeering) Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
kontekstis) alla hea või
potentsiaalselt hea.
M2C4–5
Investeering 3.2:
Rahvusparkide
digiteerimine
Eesmärk
Rahvusparkide ja
merekaitsealade
külastajatele
osutatavate
digiteenuste
halduskorra
lihtsustamise ja
arendamise jõustumine
Jõustumist käsitleva
ministri dekreedi säte PUUDUVAD PUUDUVAD PUUDUVAD 1. kv 2022
Ministri käskkirjaga antakse volitus
töötada välja digiteenused
rahvusparkide ja merekaitsealade
külastajatele.
M2C4–32
Investeering 4.2.
Veejaotusvõrkude kadude
vähendamine, sealhulgas
võrkude digiteerimine ja
seire
Eesmärk Ringkond
veejaotusvõrkudes
Järelevalvearuanded,
millele on alla
kirjutanud sõltumatu
reguleeriv asutus
ARERA
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2025
Välja on antud vähemalt 35
seirearuannet, millele on alla
kirjutanud sõltumatu reguleeriv
asutus ARERA ja mis kinnitavad
vähemalt 45 000 kilomeetri
suuruste veevarustusvõrkude
piirkonda. Need seirearuanded
sisaldavad meetme M2C4–31
täitmiseks koostatud
seirearuandeid.
M2C4–20bis
Investeeringud. 3.1:
Linna- ja linnalähedaste
metsade kaitse ja
edendamine
Siht Ümberistutatavad puud
või põõsad T3 PUUDUVAD Number 0 3 500 000 2. kv 2026
Vähemalt 3 500 000 puu või põõsa
ümberistutamine
248
G.3. Laenuga seotud reformide ja investeeringute kirjeldus
Reform 3.1 – õhusaaste kontrolli riiklike programmide vastuvõtmine
Reformi eesmärk on ühtlustada riiklikke ja piirkondlikke õigusakte ning kehtestada nendega seotud meetmed
õhusaasteainete heitkoguste vähendamiseks (kooskõlas eesmärkidega, mis on sätestatud direktiivis (EL)
2016/2284, mis käsitleb heitkoguste riiklikke ülemmäärasid ja kliimagaaside muutmist).
Investeering 1.1: Täiustatud ja integreeritud seire- ja prognoosisüsteemi rakendamine
Selle investeeringu eesmärk on teha kindlaks ja prognoosida kliimamuutuste mõjust ja ebapiisavast
ruumilisest planeerimisest tulenevaid riske ning anda teavet riskiennetuskavade jaoks. See investeering
seisneb seiresüsteemi loomises, mis võimaldab suurte territooriumide kaugkontrolli ja jäätmete
ebaseadusliku kõrvaldamise tuvastamist.
Investeering 2.1: Üleujutusriski ja hüdrogeoloogilise riski vähendamise meetmed
Meetme eesmärk on vähendada hüdrogeoloogilist ebastabiilsust Itaalia territooriumil. Meede koosneb kahest
tegevussuunast: Protezione Civile ja„Emilia Romagna, Toscana ja Marche territooriumi ülesehitamise
erakorraline volinik“, keda mõjutasid 2023. aasta mai üleujutused (Commissario per la ricostruzione nel
territorio della regione Emilia Romagna, Toscana e Marche), on vastutavad haldusasutused: esimene
tegevussuund on seotud sekkumiste kogumiga, mille eesmärk on taastada kahjustatud avalikud struktuurid ja
taristud (E-tüüpi sekkumised) ning vähendada üritusega rangelt seotud jääkriski ja mille peamine eesmärk on
kaitsta avalikku ja eraturvalisust (D-tüüpi sekkumised); teine tegevussuund on seotud meetmetega, mille
eesmärk on taastada veeteed ning suurendada kaitset üleujutuste ja maalihete eest, ning transpordivõrgu
taastamismeetmetega 2023. aasta mai üleujutustest mõjutatud territooriumidel.
Investeering 3.1: Linna- ja linnalähedaste metsade kaitse ja edendamine
Meetme eesmärk on kaitsta haljasalasid ja suurendada nende arvu, et säilitada ja suurendada elurikkust ning
parandada nende alade elanike elukvaliteeti. Meede seisneb kultiveerimismaterjali (seemned või taimed)
istutamises vähemalt 4 500 000 puule või põõsale ning vähemalt 3500 000 puu või põõsa ümberistutamises
Itaalia 13 suurlinnapiirkonnas.
Investeering 3.2 – rahvusparkide ja merekaitsealade digitaliseerimine
Meetme eesmärk on ajakohastada ja digiteerida rahvusparkide ja merekaitsealade toimimisega seotud
menetlusi. Meede hõlmab külastajatele osutatavaid digiteenuseid ning sekkumist looduskaitsesse ja
loodusvarade seiresse.
Investeering 3.3 – Po piirkonna taasloomine
Meetme eesmärk on taasaktiveerida looduslikud protsessid ja soodustada bioloogilise mitmekesisuse
taastamist Po jõe piirkonnas. Meede seisneb sekkumiste elluviimises jõesängi kunstlikkuse vähendamiseks.
Investeering 3.4: Omanikuta paikade tervendamine
Selle sekkumise eesmärk on vähendada nn omanikuta alade keskkonnamõju, edendades seeläbi kaudselt
ringmajandust. See investeering seisneb Itaalia piirkondades ja autonoomsetes provintsides orbude
kindlakstegemise ja taaselustamise tegevuskava vastuvõtmises ning konkreetsete sekkumiste elluviimises
nende taastamiseks.
249
Investeering 3.5: Merepõhja ja mereelupaikade taastamine ja kaitse
Meetme eesmärk on aidata kaasa merepõhja ja mereelupaikade seisundi halvenemise peatamisele. Meetmega
toetatakse projekte, millega kaardistatakse merepõhja elupaiku ja keskkonnaseiret, planeerimist ning
ulatuslikke taastamis- ja kaitsemeetmeid, ning tõhustatakse merevaatlusplatvorme.
Reform 4.1 Õigusaktide lihtsustamine ja juhtimise tugevdamine veevarustustaristusse tehtavate
investeeringute rakendamiseks
Praegune õigusraamistik ja majandamise praegune killustatus avaldavad negatiivset mõju
veevarustustaristusse tehtavate investeeringute kavandamise ja rakendamise suutlikkusele.
Reformi eesmärk on lihtsustada ja tõhustada õigusraamistikku ning anda vajaduse korral abi
rakendusasutustele, kellel ei ole piisavat suutlikkust teha ja lõpule viia neid investeeringuid algselt
kehtestatud tähtaegade jooksul.
Peamised kavandatud meetmed nende eesmärkide saavutamiseks on peamiselt järgmised: i) veesektori
investeeringute jaoks keskse riikliku rahastamisvahendi loomine, mis ühtlustab praegu üsna hajutatud
ressursid; ii) rahastatavate investeeringute aruandlus- ja järelevalvemenetluste lihtsustamine, iii) reguleeriva
asutuse täiendav kaasamine tehtavate investeeringute kavandamisse ja kava võimalikku läbivaatamisse.
Infrastruktuuri- ja transpordiministeerium esitab veevarustussektoriga seotud reformiettepaneku.
Investeering 4.1 – Esmane veetaristu veevarustuse kindluse tagamiseks
Meetme eesmärk on tagada oluliste linnapiirkondade ja suurte niisutatud alade veevarustuskindlus, et
suurendada võrgu ohutust ja vastupidavust ka seoses vee transpordivõimsusega. Meede hõlmab töid kogu
riigi territooriumil asuvas primaarveetaristus.
Investeering 4.2. Veejaotusvõrkude kadude vähendamine, sealhulgas võrkude digiteerimine ja seire
Selle investeeringu eesmärk on vähendada joogivee kadu. Meede seisneb veejaotusvõrkude hajutamises.
Investeering 4.3. Investeeringud niisutussüsteemi vastupanuvõimesse veevarude paremaks
majandamiseks
Meetme eesmärk on suurendada niisutussüsteemide tõhusust digitaliseerimise ja taristumeetmete kaudu, et
muuta põllumajandussektor kestlikumaks ja kliimamuutustele vastupanuvõimelisemaks.
Investeering 4.4. Kanalisatsioon ja puhastamine
Meetme eesmärk on vähendada Itaalia kanalisatsiooni- ja reoveepuhastussüsteemide nõrkust ning nõrkade
kanalisatsiooni- ja puhastussüsteemidega linnastute arvu. Meede koosneb sekkumistest, mis on seotud
kanalisatsiooni ja asulareovee puhastamise süsteemidega kogu riigi territooriumil.
Investeering 4.5. Veetaristusse tehtavate investeeringute toetuskava
See meede hõlmab avaliku sektori investeeringut toetuskavasse, et stimuleerida erainvesteeringuid ja
parandada juurdepääsu rahastamisele Itaalia veemajandussektoris. Abikava raames antakse elujõulisuse
puudumise toetusi otse erasektorile ja sarnase tegevusega tegelevatele avaliku sektori asutustele.
Kava haldab rakenduspartnerina Invitalia S.p.A. Kava hõlmab järgmist tooteseeriat:
• Elujõulisuse puudujääkide toetus, mille eesmärk on katta veemajandussektori taristuprojektide
rahastamispuudujääk. Toetusega subsideeritakse osa koguinvesteeringust, et tagada projekti
pangakõlblikkus. Toetusstruktuuri ülesehitus stimuleerib veeteenuse osutajate ratsionaliseerimist ja
koondamist, kehtestades premeerimismehhanismi.
Kavasse tehtava investeeringu rakendamiseks allkirjastavad Itaalia ja Invitalia S.p.A. rakenduslepingu, mis
sisaldab järgmist:
250
1. Kava otsustusprotsessi kirjeldus: Kava lõpliku rahastamisotsuse teeb investeerimiskomitee või muu
asjakohane samaväärne juhtorgan ja see kiidetakse heaks valitsusest sõltumatute liikmete häälteenamusega.
2. Seotud toetuspoliitika põhinõuded,mis hõlmavad järgmist:
a. Antud toetuste ja rahastamiskõlblike lõplike abisaajate kirjeldus. Lõplikud abisaajad on
põhimõtteliselt eraosalusega äriühingud. Kooskõlas mittediskrimineerimise põhimõttega võib
lõplike abisaajatena aktsepteerida ka avalik-õiguslikke üksusi, kes tegelevad kavast kasu saavate
eraõiguslike üksustega sarnase tegevusega.
b. Nõue, et kõik toetatavad investeeringud peavad olema majanduslikult elujõulised.
c. Nõue järgida põhimõtet „ei kahjusta oluliselt“, nagu on sätestatud põhimõtte „ei kahjusta
oluliselt“ tehnilistes suunistes (2021/C58/01). Eelkõige jäetakse toetuspõhimõtetega
rahastamiskõlblikkuse alt välja järgmised tegevused ja varad: fossiilkütustega seotud tegevus ja
varad, sealhulgas allkasutus71. Lisaks sisaldab asjaomane toetuspoliitika nõuet jätta rahastamisest
välja: investeeringud, mis hõlmavad uute tammide ehitamist; investeeringud, mis kuuluvad
Euroopa Parlamendi ja nõukogu 23. oktoobri 2000. aasta direktiivi 2000/60, millega kehtestatakse
ühenduse veepoliitika alane tegevusraamistik, artikli 4 lõike 7 kohaldamisalasse.
d. Nõue, et kava lõplikud abisaajad ei tohi samade kulude katmiseks saada toetust muudest liidu
vahenditest.
3. Rakenduslepinguga hõlmatud summa, rakenduspartneri tasude struktuur ja nõue kasutada kava kasutamata
tulu, sealhulgas pärast 2026. aastat, samadel poliitilistel eesmärkidel.
4. Seire-, auditi- ja kontrollinõuded, sealhulgas:
a. Rakenduspartneri kasutatud toetustest aruandmise järelevalvesüsteemi kirjeldus.
b. Rakenduspartneri selliste menetluste kirjeldus, millega tagatakse pettuste, korruptsiooni ja huvide
konfliktide ennetamine, avastamine ja kõrvaldamine.
c. Kohustus kontrollida enne tegevuse jaoks toetuse andmist iga tegevuse rahastamiskõlblikkust
kooskõlas rakenduslepingus sätestatud nõuetega.
d. Kohustus teha riskipõhiseid järelauditeid kooskõlas Invitalia S.p.A. auditikavaga. Nende audititega
kontrollitakse i) kontrollisüsteemide tõhusust, sealhulgas pettuste, korruptsiooni ja huvide konflikti
avastamist; ii) põhimõtte „ei kahjusta oluliselt“ järgimine, riigiabi eeskirjad, kliimaeesmärgi
nõuded; ning iii) järgitakse nõuet, et kava lõplikud abisaajad ei tohi olla saanud samade kulude
katmiseks toetust muudest liidu vahenditest. Auditite käigus kontrollitakse ka tehingute
seaduslikkust ning kohaldatava rakendus- ja toetuslepingu tingimuste täitmist.
5. Rakenduspartneri tehtavatele kliimainvesteeringutele esitatavad nõuded: vähemalt 630 516 880,25
eurot taaste- ja vastupidavusrahastu investeeringutest kavasse aitab kaasa kliimamuutustega seotud
eesmärkide saavutamisele kooskõlas taaste- ja vastupidavusrahastu määruse VI lisaga.72
71 Välja arvatud a) maagaasi kasutavad varad ja tegevused elektri- ja/või soojusenergia tootmises ning nendega seotud
ülekande- ja jaotustaristus, mis vastavad põhimõtte „ei kahjusta oluliselt“ tehniliste suuniste (2021/C58/01) III lisas
sätestatud tingimustele. 72 Konkreetsete projektidega seotud lõplikud toetusesaajad peavad kliimaalase panuse arvutamiseks esitama iga
toetatava projekti kohta valitud sekkumisvaldkonna põhjenduse koos projekti kirjeldusega. Kliimaalase panuse
arvutamiseks peavad lõplikud abisaajad omakapitalist, kvaasiomakapitalist, äriühingu võlakirjadest või samaväärsetest
vahenditest, mis ei ole suunatud konkreetsetele projektidele, valitud sekkumisvaldkonda(sid) põhjendama.
Rakenduspartner peab samuti esitama liikmesriigile poolaastaaruande iga projekti/tegevuse rakendamise kohta.
251
G.4. Laenu eesmärgid, sihid, näitajad ning seire ja rakendamise ajakava
Järjekorranu
mber
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad
(vahe-
eesmärgid)
Kvantitatiivsed näitajad
(sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsena
arium Eesmärk Nõuded Aasta
M2C4–6 Investeering 3.2: Rahvusparkide digiteerimine
Siht
Rahvusparkide ja merekaitsealade
külastajatele mõeldud digiteenuste
arendamine
PUUDUVAD Protsent 0 70 2. kv 2024
Vähemalt 70 % rahvusparkidest ja merekaitsealadest on välja töötanud digiteenused rahvusparkide ja merekaitsealade külastajatele (vähemalt kaks järgmistest: ühendus portaaliga Naturitalia.IT; haldusmenetluste taotlus või kestliku liikuvuse rakendus).
M2C4–6bis Investeering 3.2: Rahvusparkide digiteerimine
Eesmärk Looduskaitse ja seirega seotud
sekkumised
Väljaantud sertifikaadid
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2026
Vastavustõendamise sertifikaadid, mis on välja
antud vähemalt kuuele looduskaitse- ja/või
seireseadmete partiile, mis kokku moodustavad
vähemalt 12 000 seadet;
Haldussertifikaadid, mis kinnitavad, et loodusparkides ja/või merekaitsealadel on osutatud vähemalt seitset teadus- ja/või kohapealse seire teenust.
M2C4–7
Reform 3.1: Õhusaaste kontrolli riiklike programmide
vastuvõtmine
Eesmärk Riikliku õhusaaste kontrolli programmi
jõustumine
DPCM säte, milles on märgitud
jõustumine
PUUDUVAD EI
KOHALDAT A
PUUDUVAD 4. kv 2021
Ministrite nõukogu esimehe dekreediga kehtestatakse riiklik õhusaaste kontrolli programm, millega kehtestatakse asjakohased meetmed õhusaaste vähendamiseks kooskõlas ELi direktiiviga 2016/2284 ja 30. mai 2018. aasta seadusandliku dekreediga nr 81, millega see direktiiv üle võetakse.
M2C4–8
Investeering 1.1. Täiustatud ja
integreeritud seire- ja prognoosisüsteemi
rakendamine
Eesmärk
Täiustatud ja integreeritud seire- ja prognoosisüsteemi
tegevuskava hüdroloogiliste riskide kindlakstegemiseks
Ministri käskkirja säte
jõustumise kohta
PUUDUVAD PUUDUVAD PUUDUVAD 3. kv 2021
Ministri käskkirjaga kiidetakse heaks
tegevusplaan täiustatud ja integreeritud seire-
ja prognoosisüsteemi rakendamiseks, et teha
kindlaks hüdroloogilised riskid. See peab
vähemalt:
Kavandada kaugseirerakendusi ja
andmeväljaandureid;
252
Järjekorranu
mber
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad
(vahe-
eesmärgid)
Kvantitatiivsed näitajad
(sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsena
arium Eesmärk Nõuded Aasta
Töötama välja sidesüsteemi, mis võimaldab
juhtimisruumide eri operaatorite vahelist
koordineerimist ja koostalitlusvõimet;
Luua kesksed ja piirkondlikud kontrolliruumid;
Küberjulgeoleku süsteemide ja teenuste arendamine
M2C4–9
Investeering 1.1. Täiustatud ja
integreeritud seire- ja prognoosisüsteemi
rakendamine
Eesmärk Seire- ja
prognoosisüsteem on kättesaadav
Süsteem on veebis
kättesaadav PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2025
Seire- ja prognoosisüsteem hüdroloogiliste riskide ja jäätmete ebaseadusliku kõrvaldamise kindlakstegemiseks on kättesaadav internetis.
M2C4–11
Investeering 2.1.a. Üleujutus- ja
hüdrogeoloogilise ohu vähendamise meetmed –
Sekkumised Emilia Romagnas, Toscanas
ja Marches
Eesmärk
Sekkumiste kindlaksmääramine
hädaolukorra voliniku käskkirja(de)ga
Hädaolukorra voliniku
määrus(ed) 3. kv 2024
Hädaolukorra voliniku ühes või mitmes määruses määratakse kindlaks veeteede taastamise ning üleujutuste ja maalihete eest kaitsmise meetmete täpne loetelu, üldkasutatavate hoonete, sealhulgas üldkasutatavate majade ja tervisekeskuste taastamise meetmed ning taastatava transpordivõrgu kilomeetrite koguarv. Sekkumiste koguväärtus on vähemalt 1,2 miljardit eurot.
M2C4–11a
Investeering 2.1.a. Üleujutus- ja
hüdrogeoloogilise ohu vähendamise meetmed –
Sekkumised Emilia Romagnas, Toscanas
ja Marches
Siht Läbiviidud
sekkumised PUUDUVAD Number 0 190 2. kv 2026
Antakse välja haldustõendid, milles kinnitatakse, et on toimunud vähemalt 190 sekkumist veeteede taastamiseks ning üleujutuste ja maalihete vastase kaitse suurendamiseks, samuti transpordivõrgu taastamisega seotud sekkumist, nagu on kindlaks määratud hädaolukorra voliniku määrustes.
M2C4–12 Investeering 2.1.b.
Üleujutus- ja Eesmärk
Üleujutus- ja hüdrogeoloogiliste
Määruste sätted jõustumise
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2021 Dekreetidega, millega kiidetakse heaks esimene üleujutus- ja hüdrogeoloogilise ohu
253
Järjekorranu
mber
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad
(vahe-
eesmärgid)
Kvantitatiivsed näitajad
(sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsena
arium Eesmärk Nõuded Aasta
hüdrogeoloogilise riski vähendamise
meetmed
riskidega seotud sekkumisi käsitleva
läbivaadatud õigusraamistiku
jõustumine
kohta vähendamise sekkumis- ja investeerimiskava vastavas piirkonnas (voliniku delegaat/piirkond/autonoomne provints), püütakse taastada algsed tingimused ja tagada territooriumide vastupanuvõime loodusõnnetustele.
M2C4–13
Investeering 2.1b – Üleujutus- ja
hüdrogeoloogilise riski vähendamise
meetmed
Siht Rakendatud D- ja E-
tüüpi sekkumised PUUDUVAD Protsent 0 90 2. kv 2026
Antakse välja haldustõendid, mis kinnitavad, et vähemalt 90 % E- ja D-tüüpi sekkumistest, mille eesmärk on taastada kahjustatud avalikud rajatised, mis on kindlaks määratud riikliku kodanikukaitseteenistuse heakskiitmisaktides, on ellu viidud.
M2C4–18
Investeeringud. 3.1: Linna- ja
linnalähedaste metsade kaitse ja
edendamine
Eesmärk
Linna- ja linnalähedaste
rohealade kaitset ja väärtustamist
käsitlevate läbivaadatud
õiguslike muudatuste jõustumine
Asjaomaste õigusaktide
säte, mis viitab linna
metsastamiskav a
vastuvõtmisele
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2021
Linna metsastamiskava peab olema kooskõlas
12. detsembri 2019. aasta seaduse 141
(edaspidi „kliimaseadus“) eesmärkidega ja
järgima suurlinnade teostatavat
planeerimisetappi. Kavas tuleks seada
vähemalt järgmised eesmärgid:
Säilitada ja suurendada hajusat bioloogilist
mitmekesisust kooskõlas Euroopa bioloogilise
mitmekesisuse strateegiaga;
Aidata kaasa õhusaaste vähendamisele
suurlinnapiirkondades,
Vähendada õhukvaliteediga seotud
rikkumismenetlusi;
Taastada inimtekkelisi maastikke ja parandada
suurlinnapiirkondade vahetus läheduses
asuvaid kaitsealasid;
Piirata mulla tarbimist ja taastada kasulik muld.
254
Järjekorranu
mber
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad
(vahe-
eesmärgid)
Kvantitatiivsed näitajad
(sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsena
arium Eesmärk Nõuded Aasta
M2C4–19
Investeeringud. 3.1: Linna- ja
linnalähedaste metsade kaitse ja
edendamine
Siht
Puude istutamine linna- ja
linnalähedaste rohealade
kaitsmiseks ja väärtustamiseks T1
PUUDUVAD Number 0 1 650 000 4. kv 2022
Istutada vähemalt 1 650 000 puud linna- ja linnalähedaste piirkondade taasmetsastamiseks vastavalt 12. detsembri 2019. aasta seaduse 141 (nn kliimaseadus) artiklile 4.
M2C4–20
Investeeringud. 3.1: Linna- ja
linnalähedaste metsade kaitse ja
edendamine
Siht
Puude istutamine linna- ja
linnalähedaste rohealade kaitseks ja väärtustamiseks T2
PUUDUVAD Number 1 650 000 4 500 000 4. kv 2024
Kultiveerimismaterjali (seemned või taimed) istutamine vähemalt 4 500 000 puule ja põõsale linna- ja linnalähedaste piirkondade taasmetsastamiseks vastavalt 12. detsembri 2019. aasta seaduse 141 (nn kliimaseadus) artiklile 4.
M2C4–21 Investeering 3.3 Po
piirkonna taasväärtustamine
Eesmärk
Po piirkonna taasloodustamise
sekkumiste õigusraamistiku läbivaatamine
Asjakohase õigusakti
jõustumisele viitav säte
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2023
Selliste asjakohaste õigusaktide jõustumine, mille eesmärk on taastada jõesängi ökoloogiline koridor, sealhulgas looduslik taasmetsastamine ning sekkumised külgharude ja okste taastamiseks ja taasaktiveerimiseks.
M2C4–22 Investeering 3.3 Po
piirkonna taasväärtustamine
Siht
Jõesängi kunstlikkuse
vähendamine Po piirkonna T1
taasloomiseks
PUUDUVAD Number 0 13 4. kv 2024 Vähendada jõesängi kunstlikkust vähemalt 13 km võrra piki Po telge.
M2C4–23 Investeering 3.3 Po
piirkonna taasväärtustamine
Siht
Jõesängi kunstlikkuse
vähendamine Po piirkonna T2
taasloomiseks
PUUDUVAD Number 13 37 2. kv 2026
Haldussertifikaadid, mis kinnitavad jõesängi
kunstlikkuse vähenemist vähemalt 37 km võrra
piki Po telge.
Haldussertifikaadid, mis kinnitavad taasmetsastamismeetmeid, mis hõlmavad vähemalt 337 hektarit kaldaäärseid metsamaid.
M2C4–24 Investeering 3.4.
Omanikuta maa-alade mulla tervendamine
Eesmärk Orbude tervendamise
õigusraamistik
Asjaomase õigusakti säte,
mis viitab PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2022
Omanikuta alade taaselustamise
tegevuskavaga vähendatakse maa hõivamist ja
tõhustatakse linnade taaselustamist. See peab
255
Järjekorranu
mber
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad
(vahe-
eesmärgid)
Kvantitatiivsed näitajad
(sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsena
arium Eesmärk Nõuded Aasta
tegevuskava vastuvõtmisele
sisaldama vähemalt järgmist:
Omanikuta alade kindlakstegemine kõigis 21
piirkonnas ja/või autonoomses provintsis
Konkreetsed meetmed, mida tuleb võtta igal omanikuta maa-alal, et vähendada maa hõivamist ja edendada linnade taaselustamist
M2C4–25 Investeering 3.4.
Omanikuta maa-alade mulla tervendamine
Siht Omanikuta paikade
taaselustamine PUUDUVAD Number 0 4 441 544 2. kv 2026
Akt(id), millega kinnitatakse mulla tervendamismenetluste lõpuleviimist (nagu on täpsustatud tegevuskava artikli 5 lõikes 3), mis on välja antud vähemalt 4 441 544 ruutmeetrile tegevuskavas loetletud omanikuta aladele.
M2C4–26
Investeering 3.5. Merepõhja ja
mereelupaikade taastamine ja kaitse
Siht Merepõhja ja
mereelupaikade taastamine ja kaitse
PUUDUVAD Number 0 10 2. kv 2025
Ellu on viidud järgmised 10 tegevust:
Austrite taastamise kohad on paigutatud
vähemalt ühte kohta iga järgmise piirkonna
kohta: Friuli-Venezia Giulia ja Emilia Romagna;
Merepõhi ja meretaimestik on istutatud
vähemalt ühte kohta iga järgmise piirkonna
kohta: Lazio, Campania, Calabria, Sitsiilia;
Vahemere lääne-, kesk- ja lõunapiirkonna
aladele on paigaldatud poidega varustatud
sildumisväljad;
Varivõrgud on eemaldatud kokku vähemalt 15
kohas Sitsiilias, Campanias, Lazios, Apuulias,
Marches ja Emilia Romagnas;
Ranniku radiaaljaamu on hooldatud või
paigaldatud või varustatud arendustarkvaraga
vähemalt üheksas asukohas ning ostetud on
liikuv okeanograafiliste uuringute üksus;
Kasutusele on võetud vähemalt 12
lainemõõtmispoid;
256
Järjekorranu
mber
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad
(vahe-
eesmärgid)
Kvantitatiivsed näitajad
(sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsena
arium Eesmärk Nõuded Aasta
Vähemalt 25 loodete gabariidiga võrgujaamas
on hooldatud või paigaldatud uusi andureid;
Vähemalt kolme uue mereilmajaama
paigaldamine ja vähemalt 25 mereilmajaama
hooldamine Veneetsia laguuni piirkonnas;
Paigaldatud on vähemalt 10 paikset seirejaama
laguunide keemiliste, füüsikaliste ja troofiliste
parameetrite pidevaks seireks;
Andmeid on saadud vähemalt viiest mere- ja
rannikuelupaikade seire tarkvarasüsteemist.
Laevade või laevade ostmine peab toimuma parima võimaliku tehnoloogia abil, millel on sektoris kõige väiksem keskkonnamõju.
M2C4–27
Reform 4.1. Õigusaktide
lihtsustamine ja juhtimise tugevdamine veevarustustaristusse
tehtavate investeeringute rakendamiseks
Eesmärk
Veevarustuse kindluse tagamiseks primaarveetaristusse sekkumist käsitlevate
õigusaktide lihtsustamise jõustumine
Asjaomas(t)e õigusakti(de) sätted, mis
viitavad jõustumisele
PUUDUVAD PUUDUVAD PUUDUVAD 1. kv 2022
Läbivaadatud õigusaktidega tugevdatakse
juhtimist ja lihtsustatakse veevarustustaristusse
tehtavate investeeringute rakendamist. Uus
õigusraamistik peaks sisaldama vähemalt
järgmist:
– Muuta riiklik veesektorisse sekkumise kava
veesektori investeeringute keskseks
rahastamisvahendiks.
– Küsida arvamust ja kaasata reguleeriv asutus
(Autorità di Regolazione per Energia Reti e
Ambiente) aktiivselt kava mis tahes muutmisse
või ajakohastamisse.
– Pakkuda toetust ja kaasnevaid meetmeid
rakendusasutustele, kes ei suuda ettenähtud
aja jooksul teha esmaste hangetega seotud
investeeringuid.
– Lihtsustada veesektoris rahastatud
257
Järjekorranu
mber
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad
(vahe-
eesmärgid)
Kvantitatiivsed näitajad
(sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsena
arium Eesmärk Nõuded Aasta
investeeringute aruandlus- ja järelevalvemenetlusi.
M2C4–28
Investeering 4.1. Investeeringud
veevarustuse kindlust tagavatesse esmastesse
veeinfrastruktuuridess e
Eesmärk
Rahaliste vahendite eraldamine kõigile
projektidele, mis on seotud
investeeringutega primaarveetaristusse
ja veevarustuse kindlusesse
Dekreetide avaldamine
PUUDUVAD PUUDUVAD PUUDUVAD 3. kv 2023
Vastuvõtmisdekreedi(de) avaldamine koos
rahaliste vahendite eraldamisega
(eraldamisega) projektidele, mille eesmärk on
investeerida primaarveetaristusse ja
veevarustuse kindlusse.
Lepingute reguleerimisala on järgmine:
Oluliste linnapiirkondade veevarustuse kindlus;
Struktuuritööd võrgu ohutuse ja vastupidavuse
suurendamiseks, sealhulgas kliimamuutustega
kohanemine (v.a tammid);
Vee transpordivõimsuse suurendamine.
Valikukriteeriumidega tagatakse, et
investeering aitab täielikult kaasa
kliimamuutustega seotud eesmärkide
saavutamisele 40 % kliimakoefitsiendiga
vastavalt taaste- ja vastupidavusrahastu
määruse (EL) 2021/241 VI lisale.
M2C4–29
Investeering 4.1. Investeeringud
veevarustuse kindlust tagavatesse esmastesse
veeinfrastruktuuridess e
Siht Haldussertifikaadid
sekkumiseks veesüsteemides
PUUDUVAD Number 0 45 1. kv 2026
Väljastatud on haldussertifikaadid, mis
kinnitavad, et tööd on lõpetatud sekkumisteks
vähemalt 45 veesüsteemis (nii kompleks- kui
ka lihtveesüsteemis), millest vähemalt 32 on
keerukad veesüsteemid.
M2C4–30
Investeering 4.2. Veejaotusvõrkude
kadude vähendamine, sealhulgas võrkude
digiteerimine ja seire
Eesmärk
Rahaliste vahendite eraldamine kõigile projektidele, mis
käsitlevad sekkumist veejaotusvõrkudesse
Dekreetide avaldamine
PUUDUVAD PUUDUVAD PUUDUVAD 3. kv 2023
Vastuvõtudekreedi(de) avaldamine koos
rahaliste vahendite eraldamisega
(eraldamisega) projektidele, mis on seotud
sekkumistega veevarustusvõrkude
ajakohastamiseks ja tõhustamiseks.
258
Järjekorranu
mber
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad
(vahe-
eesmärgid)
Kvantitatiivsed näitajad
(sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsena
arium Eesmärk Nõuded Aasta
, sealhulgas võrkude digiteerimist ja seiret
Lepingute reguleerimisala on järgmine:
Sekkumised joogiveevõrkude kadude
vähendamiseks;
Suurendada veesüsteemide vastupanuvõimet
kliimamuutustele;
Tugevdada võrkude digiteerimist, et tagada veevarude optimaalne majandamine, vähendada jäätmeid ja vähendada ebatõhusust
M2C4–31
Investeering 4.2. Veejaotusvõrkude
kadude vähendamine, sealhulgas võrkude
digiteerimine ja seire
Siht
Sekkumine veejaotusvõrkudesse , sealhulgas võrkude T1 digiteerimine ja
seire
PUUDUVAD Number 0 14 000 4. kv 2024 Ringkond, kus on vähemalt 14 000 kilomeetrit veevõrku
M2C4–33
Investeering 4.3 Investeeringud
niisutussüsteemi vastupanuvõimesse veevarude paremaks
majandamiseks
Eesmärk
Rahaliste vahendite eraldamine kõigile niisutussüsteemi vastupanuvõime
projektidele veevarude paremaks
majandamiseks
Dekreetide avaldamine.
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2023
Vastuvõtudekreedi(de) avaldamine koos
rahaliste vahendite eraldamisega
(eraldamisega) projektidele, mis on seotud
sekkumistega võrkudes ja niisutussüsteemides
ning nendega seotud digiteerimis- ja
seiresüsteemis.
Lepingute reguleerimisala on järgmine:
Soodustada ühisvõrkudes kasutamise
mõõtmist ja seiret (arvestite ja
kaugjuhtimissüsteemide paigaldamise kaudu),
sealhulgas üleminekut omavarustatuselt
ühiskasutusele, mis on eeltingimus
veehinnapoliitika kehtestamise lõpuleviimiseks,
mis põhineb veemahtudel veevarude tõhusaks
kasutamiseks põllumajanduses ja mille
tulemusena stimuleeritakse ebaseadusliku
veevõtu vähendamist maapiirkondades.
Niisutusinvesteeringute eesmärk peaks olema
259
Järjekorranu
mber
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad
(vahe-
eesmärgid)
Kvantitatiivsed näitajad
(sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsena
arium Eesmärk Nõuded Aasta
olemasoleva niisutuse tõhustamine, isegi kui
asjaomane veekogu on heas seisundis.
Eeldatakse, et see meede ei kahjusta oluliselt
keskkonnaeesmärke määruse (EL) 2020/852
artikli 17 tähenduses, võttes arvesse meetme
kirjeldust ning taaste- ja vastupidavuskavas
sätestatud leevendavaid meetmeid kooskõlas
põhimõtte „ei kahjusta oluliselt“ tehniliste
suunistega.
(2021/C58/01). Eelkõige tagatakse iga
allinvesteeringu puhul täielik vastavus ELi
õiguse, sealhulgas veepoliitika raamdirektiivi
nõuetele enne ehitustööde algust, nende ajal ja
pärast neid.
Lisaks tuleb sekkumiste puhul, kui see on liikmesriigi õiguse kohaselt kohaldatav, teha direktiivi 2011/92/EL kohane keskkonnamõju hindamine ning asjakohased hindamised direktiivi 2000/60/EÜ ja direktiivi 92/43/EMÜ kontekstis, sealhulgas nõutavate leevendusmeetmete rakendamine.
M2C4–34
Investeering 4.3 Investeeringud
niisutussüsteemi vastupanuvõimesse veevarude paremaks
majandamiseks
Siht
Sekkumised niisutussüsteemi vastupanuvõime
suurendamiseks, et parandada veevarude
majandamist T1
PUUDUVAD Number 0 40 4. kv 2024
Vähemalt 40 veevõtuallikat (loetletud
SIGRIANis), mis on seotud veekontsessiooniga
(concessione di derivazione) ja mille voolukiirus
on vähemalt 100 l/s, peavad olema varustatud
arvestitega.
Võrgu tõhususega seotud üldine sekkumine
hõlmab ka järgmiste seadmete paigaldamist:
300 kolmanda taseme arvestit;
10 000 neljanda taseme arvestit;
260
Järjekorranu
mber
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad
(vahe-
eesmärgid)
Kvantitatiivsed näitajad
(sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsena
arium Eesmärk Nõuded Aasta
Digitaliseerimine ja võrgu täiustamine.
M2C4–34a
Investeering 4.3 Investeeringud
niisutussüsteemi vastupanuvõimesse veevarude paremaks
majandamiseks
Siht
Sekkumised niisutussüsteemi vastupanuvõime
suurendamiseks, et parandada veevarude
majandamist T1.2
PUUDUVAD Number 40 105 2. kv 2026
Vähemalt 105 veevõtuallikat (loetletud
SIGRIANis), mis on seotud vee
kontsessiooniga (concessione di derivazione)
võimsusega vähemalt 100 l/s, peavad olema
varustatud arvestitega.
Võrgu tõhususega seotud sekkumistest peab
saama kasu vähemalt 422 407 hektarit
niisutatud ala ja need hõlmavad järgmist:
750 kolmanda taseme arvesti paigaldamine;
Paigaldatakse 25 000 neljanda taseme arvestit.
M2C4–35
Investeering 4.3 Investeeringud
niisutussüsteemi vastupanuvõimesse veevarude paremaks
majandamiseks
Siht
Sekkumised niisutussüsteemi vastupanuvõime
suurendamiseks, et parandada veevarude
majandamist T2
PUUDUVAD Hektarites 0 96 390 4. kv 2024 Niisutusressursside tõhusast kasutamisest peab kasu saama vähemalt 96 390 hektarit niisutatud ala.
M2C4–36
Investeering 4.4 – Investeeringud
kanalisatsiooni ja puhastusse
Eesmärk
Vahendite eraldamine
kanalisatsiooni- ja puhastusprojektidele
Dekreedi avaldamine
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2023
Vastuvõtmismääruse avaldamine koos
projektiettepanekute rahastamisega
(eraldamisega).
Sekkumised:
Tõhustada mere- ja siseveekogudesse juhitava
reovee puhastamist, muu hulgas tehnoloogilise
innovatsiooni abil;
Muuta võimaluse korral mõned
puhastusjaamad keskkonnahoidlikeks
tehasteks, kus taaskasutatakse puhastatud
reovett niisutamiseks ja tööstuslikel
eesmärkidel.
261
Järjekorranu
mber
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad
(vahe-
eesmärgid)
Kvantitatiivsed näitajad
(sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsena
arium Eesmärk Nõuded Aasta
See meede ei kahjusta oluliselt keskkonnaeesmärkide saavutamist määruse (EL) 2020/852 artikli 17 tähenduses, võttes arvesse meetme kirjeldust ja leevendusmeetmeid, mis on sätestatud taaste- ja vastupidavuskavas kooskõlas põhimõtte „ei kahjusta oluliselt“ tehniliste suunistega (2021/C58/01). Eelkõige ei ole abikõlblik reoveesetete põletamine.
M2C4–38
Investeering 4.4 – Investeeringud
kanalisatsiooni ja puhastusse
Siht
Kanalisatsiooni ja asulareovee
puhastamisega seotud sekkumised
PUUDUVAD Number 0 145 2. kv 2026
Välja on antud haldussertifikaadid, mis kinnitavad, et kanalisatsiooni ja asulareovee puhastamise valdkonnas on tehtud vähemalt 145 sekkumist.
M2C4–39
Investeering 4.5 Veetaristusse
tehtavate investeeringute
toetuskava
Eesmärk Rakenduskokkulepe. Rakenduskokku
leppe jõustumine
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2026
Rakenduskokkuleppe jõustumine.
M2C4–40
Investeering 4.5 Veetaristusse
tehtavate investeeringute
toetuskava
Siht
Lõplike abisaajatega sõlmitud juriidilised
lepingud ja investeeringu lõpuleviimine
PUUDUVAD Protsendimää
r (%) 0 % 100 % 2. kv 2026
Invitalia S.p.A. peab olema sõlminud lõplike
toetusesaajatega seaduslikud toetuslepingud
summas, mis on vajalik, et kasutada 100 %
taaste- ja vastupidavusrahastu investeeringust
kavasse (võttes arvesse haldustasusid).
Vähemalt 40 % sellest rahastusest peab aitama
kaasa kliimaeesmärkide saavutamisele,
kasutades taaste- ja vastupidavusrahastu
määruse VI lisas esitatud metoodikat.
Itaalia kannab rahastu jaoks üle 1 576 292 200,62 eurot äriühingule Invitalia S.p.A.
262
H. ÜLESANDE 3 KOMPONENT 1: Kestlik transporditaristu
H.1. Tagastamatu rahalise toetusega seotud reformide ja investeeringute kirjeldus
PUUDUVAD
H.2. Tagastamatu rahalise toetuse eesmärgid, sihid, näitajad ning seire ja rakendamise
ajakava
Ei kohaldata
H.3. Laenuga seotud reformide ja investeeringute kirjeldus
Selle komponendi raames tehtavate investeeringutega toetatakse raudteetaristu (kiirraudtee,
kaubaraudtee, piirkondlikud raudteed, Euroopa raudteeliikluse juhtimissüsteem) kasutuselevõttu.
Nendega kaasnevad reformid raudteetaristusse tehtavate investeeringute kiirendamiseks ja
maanteetaristu kvaliteedi parandamiseks. Ettevõtluskeskkonna reformi komponent sisaldab meedet,
millega luuakse piirkondadele lisastiimulid oma piirkondlike raudtee avaliku teenindamise lepingute
pakkumismenetluse korraldamiseks. See komponent sisaldab meetmeid vesiniku kasutamise
arendamiseks raudteedel.
Selle komponendiga toetatakse 2019. aasta riigipõhise soovituse nr 3 (milles kutsuti Itaaliat üles
keskenduma investeeringutega seotud majanduspoliitikas taristu kvaliteedile, võttes arvesse
piirkondlikke erinevusi) ja 2020. aasta riigipõhise soovituse nr 3 (küpsete avaliku sektori
investeerimisprojektide kiirendamine) täitmist ning suunama investeeringud rohe- ja digipöördesse,
eelkõige puhtasse ja tõhusasse energiatootmisse ja -kasutusse, teadusuuringutesse ja innovatsiooni,
kestlikku ühistransporti, jäätmekäitlusse ja veemajandusse ning tugevdatud digitaristusse, et tagada
oluliste teenuste osutamine.
Lähtudes meetmete kirjeldusest taaste- ja vastupidavuskavas ja võttes arvesse põhimõtte „Ei kahjusta
oluliselt“ tehniliste suuniste (2021/C58/01) kohaseid leevendavaid samme, mis kavas on sätestatud,
võib eeldada, et ükski selle komponendi meede ei kahjusta määruse (EL) 2020/852 artikli 17
tähenduses oluliselt keskkonnaeesmärke.
Reform 1.1 – Infrastruktuuri- ja transpordiministeeriumi (MIT) ning raudteeinfrastruktuuri-
ettevõtja Rete Ferroviaria Italiana vahelise lepingu heakskiitmisprotsessi kiirendamine
Selle reformiga kaotatakse nõue, et parlamendikomisjonid esitaksid arvamuse raudteeinfrastruktuuri-
ettevõtja Rete Ferroviaria Italiana Contratti di Programma (CdP) investeeringute loetelu kohta.
Parlamendikomisjonid esitavad oma arvamuse strateegilise investeerimisprogrammi kohta.
Reform 1.2 – Projektidele loa andmise protsessi kiirendamine
See reform seisneb selliste õigusaktide vastuvõtmises, mis võimaldavad prognoosida tööde asukohta
majandusliku tehnilise teostatavuse projekti (PFTE) ajal, selle asemel et oodata projekti lõplikku
kavandamisetappi. Täiendavad load, mida täistööaja ekvivalendil ei ole võimalik saada, saadakse
projekti kavandamise järgmistes etappides, ilma et erandina seadusest nr 241/1990 kutsutaks kokku
„Conferenza dei Servizi“. Nende muudatustega lühendatakse projektidele loa andmise aega 11 kuult 6
kuule.
Reform 1.3 – Itaalia raudteetaristu tõhususe suurendamine
Reformi eesmärk on edendada konkurentsi piirkondlikel ja linnadevahelistel
raudteetransporditurgudel, sealhulgas sillutades teed Intercity avaliku teenindamise lepingu
hankemenetluse õigeaegsele algatamisele kooskõlas õigusaktidega, et parandada raudteeliinide ja -
263
võrkude taristu planeerimist ning võtta kasutusele raudteetaristu majandamise ja investeeringute
tulemuslikkuse mõõtmine. Reform seisneb õigusaktide ja/või õigusakti(de) jõustumises.
Investeering 1.1 – Kesk- ja lõunapiirkonna kiirraudteeliinid
Selle investeeringu eesmärk on laiendada Itaalia raudteetaristut. See investeering seisneb raudteetööde
teostamises reisijate- ja kaubaveoks kasutatavas kiirraudteetaristus Napoli-Bari, Salerno-Reggio
Calabria, Palermo-Catania, Orte-Falconara ja Taranto-Metaponto-Potenza-Battipaglia liinidel.
Investeering 1.2 – Kiirliinid põhjaosas
Selle investeeringu eesmärk on laiendada Itaalia raudteetaristut. See investeering seisneb raudteetööde
teostamises reisijate- ja kaubaveoks kasutatavas kiirraudteetaristus Brescia-Verona-Vicenza-Padova ja
Liguuria-Alpi liinidel.
Investeering 1.4 – Euroopa raudteetranspordi juhtimissüsteem (ERTMS)
Selle investeeringu eesmärk on aidata kaasa Itaalia raudteeinfrastruktuuri kohandamisele Euroopa
koostalitlusvõime standarditega. See investeering seisneb 2 785 km raudteeliinide varustamises
Euroopa raudteetranspordi juhtimissüsteemiga (ERTMS) taristu ja/või tehnoloogia tasandil.
Investeering 1.8 – Raudteejaamade ajakohastamine
Selle investeeringu eesmärk on muuta raudteejaamad puuetega inimestele ja piiratud liikumisvõimega
isikutele kättesaadavamaks. See investeering seisneb 73 raudteejaama ajakohastamises.
Investeering 1.10 – Suurlinnatranspordisõlmede ja piirkondlike raudteeliinide tugevdamine
Selle investeeringu eesmärk on parandada Itaalia piirkondadevaheliste ja piirkondlike raudteeliinide
kvaliteeti. See investeering seisneb raudteeliinide ajakohastamises vähemalt 3 309 km ulatuses,
sealhulgas 1 162 km lõunas. Selle meetme alla kuuluvad projektid võivad saada toetust muudest
Euroopa programmidest.
Reform 2.1 – Riskide liigitamise ja juhtimise, turvalisuse hindamise ning olemasolevate sildade
järelevalve suuniste vastuvõtmine
See reform seisneb riskide liigitamise ja juhtimise suuniste vastuvõtmises, turvalisuse hindamises ja
olemasolevate sildade järelevalves. Suuniste vastuvõtmine, mis võimaldab kohaldada ühiseid
standardeid ja meetodeid kogu riigi teedevõrgus.
Reform 2.2 – sildade ja viaduktide omandi üleviimine madalama astme teedelt kõrgema astme
teedele
Reform seisneb sildade, viaduktide ja ülesõitude omandiõiguse üleminekus madalamat tüüpi teedelt
kõrgemat tüüpi teedele (kiirteed ja peamised linnalähiteed), mis võimaldab suurendada teedevõrgu
üldist ohutust, kuna sildu, viadukte ja ülesõite hooldavad ANAS ja/või kiirteede kontsessionäärid,
kellel on parem planeerimis- ja hooldussuutlikkus kui üksikutel omavalitsusüksustel või provintsidel.
264
H.4. Laenu eesmärgid, sihid, näitajad ning seire ja rakendamise ajakava
Järjekorra
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad
(vahe-eesmärgid)
Kvantitatiivsed näitajad
(sihtide puhul) Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium
Eesmär
k Nõuded Aasta
M3C1–1
Reform 1.1 – taristu- ja transpordiministeeriu mi ning raudteetaristu- ettevõtja vahelise lepingu heakskiitmisprotsessi kiirendamine
Eesmärk
Contratti di Programma (CdP) heakskiitmisprots essi käsitleva õigusakti muudatuse jõustumine
Seaduse säte, mis viitab Contratti di Programma heakskiitmismenetlu st käsitleva seadusemuudatuse jõustumisele
PUUDUV AD
PUUDUV AD
PUUDU VAD
4. kv 2021 Seadusandliku muudatusega lühendatakse raudteeinfrastruktuuri-ettevõtja Rete Ferroviaria Italiana Contratti di Programma (CdP) heakskiitmisprotsessi aega.
M3C1–2
Reform 1.2 – Projektidele loa andmise protsessi kiirendamine
Eesmärk
Sellise regulatiivse muudatuse jõustumine, millega lühendatakse projektidele loa andmise aega 11 kuult kuuele kuule
Õigusakti säte, mis viitab regulatiivse muudatuse jõustumisele, millega lühendatakse loa andmise aega 11 kuult kuuele kuule.
PUUDUV AD
PUUDUV AD
PUUDU VAD
4. kv 2021 Regulatiivse muudatusega lühendatakse projektidele loa andmise aega 11 kuult kuuele kuule.
M3C1–3
Investeering 1.1 – Lõunasuunalised kiirrongiühendused reisijate- ja kaubaveoks
Eesmärk
Lepingu(te) sõlmimine kiirraudtee ehitamiseks Napoli-Bari ja Palermo-Catania liinidel
Teade kõigi riigihankelepingute sõlmimise kohta kiirraudtee ehitamiseks Napoli- Bari ja Palermo- Catania liinidel
PUUDUV AD
PUUDUV AD
PUUDU VAD
4. kv 2022
Teade kõigi riigihankelepingute sõlmimise kohta kiirraudtee
ehitamiseks Napoli-Bari ja Palermo-Catania liinidel täielikus
kooskõlas riigihanke-eeskirjadega
Leping(ud) peab (peavad) viitama nende liinide järgmistele
osadele:
Napoli-Bari liin: Orsara-Bovino
Palermo-Catania liin: Catenanuova – Dittaino ja Dittaino – Enna
265
Järjekorra
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad
(vahe-eesmärgid)
Kvantitatiivsed näitajad
(sihtide puhul) Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium
Eesmär
k Nõuded Aasta
M3C1–4
Investeering 1.1 – Lõunasuunalised kiirrongiühendused reisijate- ja kaubaveoks
Eesmärk
Lepingu sõlmimine kiirraudtee ehitamiseks Salerno Reggio Calabria liinidel
Teade Salerno- Reggio Calabria liinil kiirraudtee ehitamise multidistsiplinaarse lepingu sõlmimise kohta
PUUDUV AD
PUUDUV AD
PUUDU VAD
4. kv 2023
Teade Salerno Reggio Calabria liinil kiirraudtee ehitamise
multidistsiplinaarse lepingu sõlmimise kohta.
Lepingus viidatakse selle rea järgmistele osadele: Battipaglia – Romagnano
M3C1–6
Investeering 1.1 – Kesk- ja lõunapiirkonna kiirraudteeliinid
Siht
Kiirraudteeliinid Napoli-Bari, Salerno-Reggio Calabria, Palermo-Catania, Orte-Falconara Taranto- Metaponto- Potenza- Battipaglia.
PUUDUVAD Number 0 97.5 2. kv 2026
Tõendid 67,5 km kiirraudtee ehitamise töödelõpetamise
kohta.
Bicocca-Catenanuova (Palermo-Catania liin), Cancello-
Frasso (Napoli-Bari liin) ja Napoli-Cancello (Napoli-Bari liin)
raudteepartiide puhul võetakse arvesse ainult kilomeetreid,
mille puhul on WBSi metoodika kohaselt tehtud tööd pärast
30. septembrit 2023.
Tõendid, mis kinnitavad, et WBSi metoodika kohaselt on
täiendavad 30 km ehitustöid jõudnud 100 %ni tööde
edenemisest.
Iga asjaomase projekti/investeeringu hindamisel ja sellele loa andmisel järgitakse kõiki ELi direktiivi 92/43/EMÜ artikli 6 lõigetes 3 ja 4 sätestatud eeskirju ja menetlusi ning 28. detsembri 2019. aasta Itaalia Vabariigi ametlikus väljaandes nr 303 avaldatud riiklikke mõjuhindamise suuniseid.
M3C1–9 Investeering 1.2 – Kiirliinid põhjaosas
Siht
Kiirraudtee Brescia-Verona- Vicenza-Padova liinil; Liguuria-Alpi.
PUUDUVAD Number 0 137.5 2. kv 2026
Tõendid 108,6 km kiirraudtee ehitamise töödelõpetamise
kohta.
Tõendid,mis kinnitavad, et WBSi metoodika kohaselt on
täiendavad 28,9 km ehitustöid jõudnud 100 %ni tööde
edenemisest.
266
Järjekorra
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad
(vahe-eesmärgid)
Kvantitatiivsed näitajad
(sihtide puhul) Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium
Eesmär
k Nõuded Aasta
Iga asjaomase projekti/investeeringu hindamisel ja sellele
loa andmisel järgitakse kõiki ELi direktiivi 92/43/EMÜ artikli
6 lõigetes 3 ja 4 sätestatud eeskirju ja menetlusi ning 28.
detsembri 2019. aasta Itaalia Vabariigi ametlikus
väljaandes nr 303 avaldatud riiklikke mõjuhindamise
suuniseid.
M3C1–10 Investeering 1.3 – Diagonaalühendused
Eesmärk
Lepingu sõlmimine ühenduste ehitamiseks Orte- Falconara ja Taranto- Metaponto- Potenza- Battipaglia liinidel
Teade valdkondadevahelis e lepingu sõlmimise kohta kiirraudtee ehitamiseks Orte- Falconara ja Taranto-Metaponto- Potenza-Battipaglia liinidel
PUUDUV AD
PUUDUV AD
PUUDU VAD
1. kv 2024
Teade mitut valdkonda hõlmava lepingu sõlmimise kohta
ühenduste ehitamiseks Orte-Falconara ja Taranto-
Metaponto-Potenza-Battipaglia liinidel.
Leping(ud) peab (peavad) viitama järgmistele ridadele:
Orte-Falconara
Taranto-Metaponto-Potenza-Battipaglia
M3C1–12
Investeering 1.4 – Euroopa raudteetranspordi juhtimissüsteemi (ERTMS) kasutuselevõtmine
Eesmärk
Euroopa raudteetranspordi juhtimissüsteemi hankelepingute sõlmimine
Teade kõigi selliste riigihankelepingute sõlmimise kohta, millega võetakse kasutusele Euroopa raudteetranspordi juhtimissüsteem
PUUDUV AD
PUUDUV AD
PUUDU VAD
4. kv 2022 Teade kõigi selliste riigihankelepingute sõlmimise kohta, millega võetakse kasutusele Euroopa raudteetranspordi juhtimissüsteem (ERTMS)
M3C1–14
Investeering 1.4 – Euroopa raudteetranspordi juhtimissüsteemi (ERTMS) kasutuselevõtmine
Siht
2 785 km raudteed, mis on taristu ja/või tehnoloogia tasandil varustatud Euroopa raudteetranspordi juhtimissüsteemig
PUUDUVAD Number 0 2 785 2. kv 2026 Sertifikaadid, mis kinnitavad, et 2 785 km raudteid on taristu ja/või tehnoloogia tasandil varustatud Euroopa raudteetranspordi juhtimissüsteemiga.
267
Järjekorra
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad
(vahe-eesmärgid)
Kvantitatiivsed näitajad
(sihtide puhul) Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium
Eesmär
k Nõuded Aasta
a.
M3C1–15
Investeering 1.5 – Suurlinnatranspordisõ lmede ja peamiste riiklike ühenduste tugevdamine
Siht
700 km ajakohastatud liinilõiku, mis on ehitatud suurlinnatranspor disõlmedele ja peamistele riiklikele ühendustele
PUUDUVAD Number 0 700 4. kv 2024 Vähemalt 700 km ajakohastatud liinilõiku, mis on ehitatud suurlinnatranspordisõlmedele ja peamistele riiklikele ühendustele, on valmis loa saamiseks ja kasutusetapiks.
M3C1–17
Investeering 1.7 – Lõuna-Euroopa raudteede ajakohastamine, elektrifitseerimine ja vastupidavus
Siht
Lõpule on viidud 172 km lõunas asuvate raudteede vastupidavusega seotud töid, mis on valmis loa saamiseks ja kasutusetapiks.
PUUDUVAD Number 0 172 4. kv 2023
Lõuna-raudteede vastupidavusega seotud tööde
lõpuleviimine vähemalt 172 km ulatuses, mis on valmis loa
saamiseks ja kasutusetapiks.
172 km pikkused vahemaad tähistavad järgmisi liine:
• Paola-Reggio Calabria;
• Lentini Diramazione-Gela;
• Messina – Catania – Siracusa;
• Caserta – Battipaglia;
• Romad – Napoli; ja
• Bari – Brindisi.
Eesmärk saavutatakse CLP-määrusega (Codice Locale Progetto), mida ei toetata muudest ELi fondidest kui taaste- ja vastupidavusrahastu.
M3C1–19 Investeering 1.8 – Raudteejaamade ajakohastamine (RFI
Siht Ajakohastatud ja juurdepääsetavad
PUUDUVAD Number 0 10 4. kv 2024 Kümmet raudteejaama ajakohastatakse ja need on juurdepääsetavad kooskõlas komisjoni määrusega (EL) nr
268
Järjekorra
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad
(vahe-eesmärgid)
Kvantitatiivsed näitajad
(sihtide puhul) Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium
Eesmär
k Nõuded Aasta
juhtimine; lõunas) raudteejaamad 1300/2014.
M3C1–20
Investeering 1.8 – Raudteejaamade ajakohastamine
Siht Ajakohastatud raudteejaamad
PUUDUVAD Number 10 73 2. kv 2026 73 raudteejaama ajakohastamist kinnitavad sertifikaadid.
M3C1–21
Reform 2.1 – Hiljutise „dekreedi lihtsustamise“ (mis muudeti 11. septembri 2020. aasta seaduseks nr 120) rakendamine, andes välja dekreedi, mis käsitleb riskide liigitamise ja juhtimise, turvalisuse hindamise ja olemasolevate sildade järelevalve suuniste vastuvõtmist
Eesmärk
Riskide liigitamise ja juhtimise, turvalisuse hindamise ning olemasolevate sildade järelevalve suuniste jõustumine
Dekreedi säte, mis viitab dekreedi jõustumisele, millega võetakse vastu riskide liigitamise ja juhtimise, turvalisuse hindamise ja olemasolevate sildade järelevalve suunised
PUUDUV AD
PUUDUV AD
PUUDU VAD
4. kv 2021
Suunistega kehtestatakse kogu riiklikku teedevõrku hõlmavad ühised standardid ja meetodid riskide liigitamiseks ja juhtimiseks, turvalisuse hindamiseks ja olemasolevate sildade jälgimiseks.
M3C1–22
Reform 2.2 – sildade ja viaduktide omandi üleviimine madalama astme teedelt kõrgema astme teedele
Eesmärk
Sildade, viaduktide ja tunnelite omandiõiguse üleminek madalama astme teedelt kõrgema astme teedele (maanteed ja riigi põhimaanteed)
Asjakohase õigusakti säte, milles osutatakse silla, viadukti ja tunneli omandiõiguse ülemineku jõustumisele madalama tasandi maanteedelt kõrgema tasandi maanteedele
PUUDUV AD
PUUDUV AD
PUUDU VAD
4. kv 2021
Kunstiteoste omandiõigus tuleb üle anda kuue kuu jooksul alates seaduse 120/20 jõustumisest. See viiakse eeldatavasti lõpule vastavalt seadusandlikule dekreedile 285/1992 (Codice della Strada) ja selle määrustele (presidendi dekreet 495/92), millega nähakse ette sätted omandiõiguse ülemineku kohta teeomanike vahel.
269
Järjekorra
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad
(vahe-eesmärgid)
Kvantitatiivsed näitajad
(sihtide puhul) Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium
Eesmär
k Nõuded Aasta
(maanteed ja riigi põhimaanteed)
M3C1–26
Reform 1.3 – Itaalia raudteetaristu tõhususe suurendamine
Eesmärk Õigusakti(de) jõustumine
Jõustumisele viitav(ad) õigusakt(id) ja/või õigusakt(id)
PUUDUV AD
PUUDUV AD
PUUDU VAD
2. kv 2026
Õigusakti ja vajaduse korral muu(de) õigusakti(de)
jõustumine, nagu on täpsustatud allpool.
Osa. Avaliku sektori investeeringute tõhusus ja
tulemuslikkus:
Õigusaktides nähakse ette, et infrastruktuuri- ja
transpordiministeerium võtab vastu mitmeaastase
strateegilise dokumendi, et juhtida Itaalia mitmeaastast
infrastruktuuri planeerimist vähemalt kümne aasta jooksul.
Dokumendiga edendatakse mitmeliigilist transporti ja
integreeritakse ettevõtlussektori tööstuslikud vajadused
täielikult taristu planeerimisse (näiteks eelistades
investeeringuid, mis ühendavad peamisi tööstuspiirkondi ja
logistikasõlmi transpordivõrguga).
Reformiga nähakse ette taristu planeerimise dokumentide
läbivaatamine. Täpsemalt peavad õigusaktid:
o Tagama, et Contratto di Programma, raudteetaristu
arendamise strateegia ja taristuettevõtja äriplaan on
koostatud kooskõlas taristu- ja transpordiministeeriumi
mitmeaastase strateegilise dokumendi eesmärkidega
ning on kooskõlas direktiiviga 34/2012/EL.
o Võtta Contratto di Programma heakskiitmisprotsessi
osana vastavalt riigisisesele õigusele kasutusele
reguleeriva asutuse (Autorità di regolazione dei
trasporti, ART) arvamus liikuvuse strateegilise
dokumendi (Documento strategico della mobilità
ferroviaria di passeggeri e merci) kohta (nagu on
270
Järjekorra
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad
(vahe-eesmärgid)
Kvantitatiivsed näitajad
(sihtide puhul) Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium
Eesmär
k Nõuded Aasta
määratletud Itaalia 2021. aasta seaduse nr 233 artikli
5 koma 1 punktis a). Arvamuses hinnatakse ka
kavandatud investeeringute kooskõla turuvajadustega,
mis on kogutud direktiivi 2012/34/EL artiklis 7e
osutatud koordineerimismehhanismide abil.
o Võtta uue Contratto di Programma jaoks kasutusele
vahe-eesmärkide ja sihtide ning vastavate tähtaegade
süsteem, samuti tulemusnäitajad ja
kvaliteedikriteeriumid. Näitajad ja kvaliteedikriteeriumid
kehtestatakse kooskõlas direktiivi 2012/34/EL V lisaga.
Rete Ferroviaria Italiana (RFI) juhtide boonuste
kindlaksmääramise süsteem peab olema kooskõlas
direktiivi 2012/34/EL artikli 7 lõikega 4 ning selles tuleb
arvesse võtta vahe-eesmärkide ja sihtide saavutamist
ning Contratto di Programma tulemusnäitajatega
seoses saadud tulemusi.
o Anda reguleerivale asutusele (ART) volitused määrata
kokkuleppel taristu- ja transpordiministeeriumiga
kindlaks tulemuslikkuse näitajad, mis lisatakse
Contratto di Programmale.
o Anda reguleerivale asutusele (ART) volitused jälgida
vahe-eesmärkide ja sihtide saavutamist ning Contratto
di Programmas sisalduvate tulemusnäitajate täitmist
Nõuda, et taristu- ja transpordiministeerium viiks läbi
põhjaliku kulude-tulude analüüsi Contratto di Programmaga
hõlmatud suurte investeeringute (üle 50 miljoni euro
suurused investeeringud) kohta. Analüüsis kasutatud
ühikuhindu võrreldakse raudteetaristu investeeringute eri
kategooriate rahvusvaheliste võrdlusalustega ning need
peavad olema kooskõlas kulude-tulude analüüsi käsitlevate
ELi ja riiklike suunistega. Analüüsi tulemused avatakse
271
Järjekorra
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad
(vahe-eesmärgid)
Kvantitatiivsed näitajad
(sihtide puhul) Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium
Eesmär
k Nõuded Aasta
huvitatud isikutele konsulteerimiseks enne lepingute
vastuvõtmist ja avaldatakse pärast vastuvõtmist.
Osa – Konkurss:
Õigusaktidega tugevdatakse reguleeriva asutuse (ART)
volitusi seoses avaliku teenindamise lepingutega
raudteesektoris. Kunstil on õigus teostada järelevalvet ja
esitada arvamusi avaliku teenindamise lepingute ulatuse
kindlaksmääramise ja sõlmimise kohta (otse- ja
siselepingute ning sõltuvate teenusepakkujatega
sõlmitavate lepingute puhul) raudteesektoris, sealhulgas
seoses tõhusate osade optimaalse mõõtme
kindlaksmääramisega piirkondlikes piirides ja nende vahel.
Õigusaktiga laiendatakse seaduse 118/2022
(konkurentsiseadus) artikli 9 kohaldamist, sealhulgas
vastavust ART õigustloovatele aktidele, ning 24. aprilli
2017. aasta dekreetseaduse nr 50 artikli 27 lõike 2 punkti c
kohaldamist kõigile otse- ja siselepingutele ning sõltuva
teenusepakkujaga sõlmitavatele lepingutele vastavalt
määrusele 1370/2007. Linnadevaheliste teenuste puhul, kui
lepingud sõlmitakse otse või asutusesiseselt ja sõltuva
teenusepakkujaga vastavalt määrusele 1370/2007,
laiendatakse õigusaktidega seadusandliku dekreedi nr
201/2022 artiklites 17, 30 ja 31 sätestatud põhimõtteid.
Õigusaktidega nähakse ette, et avaliku teenindamise
kohustuste lepingute pikendamise otsuste suhtes, mis on
kooskõlas määrusega 1370/2007 nõuetekohaselt
põhjendatud, kohaldatakse in house lepingute
läbipaistvuskohustusi, mis on sätestatud seadusandliku
dekreedi nr 201/2022 artiklis 31.
272
Järjekorra
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad
(vahe-eesmärgid)
Kvantitatiivsed näitajad
(sihtide puhul) Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium
Eesmär
k Nõuded Aasta
Õigusaktidega nähakse ette linnadevahelise avaliku
teenindamise lepingu või lepingute võistupakkumise
alustamine. Õigusaktidega nähakse ette, et
pakkumismenetlus hõlmab selle kohaldamisala uuesti
määratlemist kooskõlas metoodikaga, mille
raudteevaldkonda reguleeriv asutus on kehtestanud pärast
turutesti, nagu on selgitatud komisjoni määruse 1370/2007
tõlgendamise suuniste punktis 2.2.3. Õigusaktidega
nähakse samuti ette, et leping tuleb jaotada asjakohasteks
vaidlustatavateks osadeks ARTis osutatud asjakohaste
kriteeriumide alusel.
Linnadevahelise teenuse puhul nõutakse õigusaktides, et
taristu- ja transpordiministeerium teeks riigile kuuluva
veeremi läbipaistvatel ja mittediskrimineerivatel
juurdepääsutingimustel kättesaadavaks saabuvatele
ettevõtjatele, kes on välja valitud võistleva
pakkumismenetluse teel.
Piirkondlike raudteeteenuste puhul nõutakse õigusaktides,
et piirkonnad edastaksid taristu- ja
transpordiministeeriumile ajakohastatud ja täielikud andmed
ja teabe raudteetranspordi avaliku teenindamise lepingute
alusel kättesaadava veeremi, sealhulgas sellega seotud
hooldusseisundi kohta. Õigusaktides nähakse samuti ette,
et infrastruktuuri- ja transpordiministeerium avaldab igal
aastal aruande piirkondlikele ametiasutustele kättesaadava
veeremi kohta.
Õigusaktidega soodustatakse olemasolevatest lepingutest
osapartiide eraldamist ja võistupakkumist (niivõrd kui see
on võimalik kehtivate lepingute kehtivate sätete alusel).
273
Järjekorra
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad
(vahe-eesmärgid)
Kvantitatiivsed näitajad
(sihtide puhul) Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium
Eesmär
k Nõuded Aasta
M3C1–28
Investeering 1.10 – Suurlinnatranspordisõ lmede, piirkondadevaheliste ja piirkondlike raudteeliinide tugevdamine
Siht 3 309 km ajakohastatud raudteeliine
PUUDUVAD Number 872 3 309 2. kv 2026
Sertifikaadid, mis kinnitavad ministeeriumidevahelises 23.
mai 2024. aasta dekreedis MIT/MEF nr 148 osutatud
raudteeliinide uuendamist vähemalt 3 309 km võrra.
274
Ülesanne 3 – KONTROLL 2 – Intermodaalsus ja integreeritud logistika
Itaalia taaste- ja vastupidavuskava selle komponendi eesmärk on muuta Itaalia sadamad tõhusamaks
ja konkurentsivõimelisemaks, energiatõhusamaks ning logistikaahelasse paremini integreerituks.
Samuti on selle eesmärk digitaliseerida lennuliikluse korraldamise süsteem.
Selleks hõlmab see ühelt poolt olulisi reforme, et lihtsustada protsesse, ajakohastada sadamate
planeerimist ja muuta kontsessioonid Itaalia sadamates konkurentsivõimelisemaks. Teisest küljest
mõned investeeringud, mille eesmärk on tagada ühendatus Euroopa teabevahetuse põhisuundadega,
arendades sidemeid ookeani- ja Vahemere-ülese salakaubaveoga, suurendades Itaalia sadamasüsteemi
dünaamilisust ja konkurentsivõimet, pidades silmas ka kasvuhoonegaaside heitkoguste vähendamist.
Selle komponendiga seotud investeeringud peaksid märkimisväärselt suurendama reisijate- ja
kaubaveo mahtu Itaalia sadamates, avaldades positiivset mõju stimuleerivale majandustegevusele
asjaomastes piirkondades ja riigi majandusele tervikuna.
Teisest küljest on see komponent seotud logistikasüsteemide, sealhulgas lennujaamasüsteemide
digitaliseerimisega. Eeldatakse, et see muudab need sektorid konkurentsivõimelisemaks, kasutades
uuenduslikke tehnoloogilisi lahendusi, et muuta süsteem tõhusamaks ja vähendada ka nende
keskkonnamõju.
Selle komponendiga täidetakse 2019. aasta riigipõhist soovitust nr 3, milles kutsuti Itaaliat üles
keskenduma investeeringutega seotud majanduspoliitikas taristu kvaliteedile, ning 2020. aasta
riigipõhist soovitust nr 3, milles soovitati suunata investeeringud rohe- ja digipöördesse, eelkõige
puhtasse ja tõhusasse energiatootmisse ja -kasutusse, teadusuuringutesse ja innovatsiooni, kestlikku
ühistransporti, jäätmekäitlusse ja veemajandusse ning tugevdatud digitaristusse, et tagada oluliste
teenuste osutamine.
Lähtudes meetmete kirjeldusest taaste- ja vastupidavuskavas ja võttes arvesse põhimõtte „Ei kahjusta
oluliselt“ tehniliste suuniste (2021/C58/01) kohaseid leevendavaid samme, mis kavas on sätestatud,
võib eeldada, et ükski selle komponendi meede ei kahjusta määruse (EL) 2020/852 artikli 17
tähenduses oluliselt keskkonnaeesmärke.
I.1. Tagastamatu rahalise toetusega seotud reformide ja investeeringute
kirjeldus
Reform 1.1 – Strateegilise planeerimise menetluste lihtsustamine
Selle meetmega nähakse ette sadamate planeerimise ajakohastamine, et tagada Itaalia sadamasüsteemi
strateegiline visioon. Reformiga reguleeritakse vähemalt i) sadamasüsteemi asutuste arengueesmärke;
ii) kindlaks määratud ja kavandatud alad, mis on ette nähtud üksnes sadama ja tagasadama
funktsioonide täitmiseks, iii) maanteede ja raudteede viimase kilomeetri taristuühendused sadamatega,
iv) planeerimise sisu kindlaksmääramisel järgitud kriteeriumid ning v) sadama reguleerimiskavade
koostamise suunised, eeskirjad ja menetlused tuleb üheselt kindlaks määrata.
Reform 1.2 – Kontsessioonilepingute sõlmimine Itaalia sadamates
Meetme eesmärk on määrata kindlaks tingimused, mis on seotud kontsessiooni kehtivusajaga,
kontsessiooni andvate asutuste järelevalve- ja kontrollivolitustega, uuendamismenetlustega, rajatiste
üleandmisega uuele kontsessionäärile kontsessiooni lõppedes ning kontsessionääridelt võetavate
tasude miinimummäärade kindlaksmääramisega.
Reform 1.3 – Itaalia sadamates külmtriikimise lubade andmise korra lihtsustamine
275
See meede peaks lihtsustama ja vähendama lubade andmise menetlust seoses riiklike elektripõhivõrgu
jaamade ehitamisega laevade elektriga varustamise jaotusvõrkude toiteks (külmtriikimine).
Taristu- ja transpordiministeerium teeb ettepaneku loa andmise menetluse lihtsustamiseks. Eelkõige
tehakse ettepanek lasta külmtriikimise projekte hinnata piirkondlikel büroodel, kes annavad aru
majandusarengu ministeeriumile, kes võiks lühema aja jooksul projekte uurida ja seejärel need heaks
kiita. Lisaks nähakse ette regulatiivne sekkumine, et määrata kindlaks ühtne loa andmise menetlus
projektidele, mis hõlmavad üle 132 kV pinget ja ülejäänut, et kasutada ära protsessi koostoimet.
Reform 2.1: Ühtse tolliliidese („Sportello Unico Doganale“) rakendamine
Eesmärk on luua spetsiaalne ühtse kontrollikeskuse portaal, mis võimaldab koostalitlust riiklike
andmebaasidega ja tolli kontrollitegevuse koordineerimist.
Investeering 2.1: Logistikaahela digiteerimine
Selle investeeringu eesmärk on suurendada riikliku logistika konkurentsivõimet, lihtsustades
menetlusi, protsesse ja kontrolle ning keskendudes dokumentide elektroonilisele kujule ning andmete
ja teabe vahetamisele. See investeering seisneb koostalitlusvõimelise digitaalse süsteemi loomises
avaliku ja erasektori osalejate vahel kaubaveo ja logistika valdkonnas.
Investeering 2.3: Külmtriikimine
Selle investeeringu eesmärk on vähendada merendussektori kasvuhoonegaaside heidet. See
investeering seisneb sadamates elektriga varustamiseks vajaliku külmtriikimise taristu ja sellega
seotud riikliku ülekandevõrguga ühendamise taristu ehitamises.
276
I.2. Tagastamatu rahalise toetuse eesmärgid, sihid, näitajad ning seire ja rakendamise ajakava
Järjekor
ra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaar
ium Eesmärk Nõuded
Aast
a
M3C2–1
Reform 1.1 –
Strateegilise
planeerimise
menetluste
lihtsustamine
Eesmärk
Strateegilise
planeerimise
menetluste
lihtsustamisega
seotud
seadusandlike
muudatuste
jõustumine
Õigusakti(de) säte,
milles osutatakse
strateegilise
planeerimise
protsessi
menetluste
lihtsustamisega
seotud
seadusandlike
muudatuste
jõustumisele
PUUDUV
AD PUUDUVAD
PUUDUV
AD 4. kv 2022
Läbivaadatud õigusraamistikus
sätestatakse, et:
– Kõik sadamavaldajad võtavad
vastu oma süsteemi strateegilise
planeerimise dokumendid ja
sadamate reguleerimiskavad, võttes
täielikult arvesse Itaalia
sadamasüsteemide 2016. aasta
reformi, mis kiideti heaks 4. augusti
2016. aasta seadusandliku
dekreediga nr 169.
DHSiga reguleeritakse vähemalt
järgmisi elemente:
Sadamasüsteemi haldurite
eesmärkide väljatöötamine;
Kindlaksmääratud ja piiritletud alad,
mis on ette nähtud üksnes sadama-
ja tagasadamafunktsioonide
täitmiseks,
Maanteede ja raudteede viimase
kilomeetri infrastruktuuriühendused
sadamatega,
277
Järjekor
ra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaar
ium Eesmärk Nõuded
Aast
a
Planeerimise sisu
kindlaksmääramisel järgitavad
kriteeriumid,
–Määrata üheselt kindlaks sadama
reguleerimiskavade koostamise
suunised, eeskirjad ja menetlused.
M3C2–2
Reform 1.2 –
Kontsessioonilepin
gute sõlmimine
Itaalia sadamates
Eesmärk
Sadamakontsessi
oone käsitleva
määruse
jõustumine
Määruse säte
sadamakontsessio
onide määruse
jõustumise kohta
PUUDUV
AD PUUDUVAD
PUUDUV
AD 4. kv 2022
Uues määruses määratakse kindlaks
sadamates kontsessioonide andmise
raamtingimused. Määruses
sätestatakse vähemalt järgmine:
–Kontsessiooni kestusega seotud
tingimused;
–Toetust andvate asutuste
järelevalve- ja kontrollivolitused;
–Uuendamismeetodid;
Tehaste üleandmine uuele
kontsessionäärile kontsessiooni
lõppemisel;
–Piirab litsentsisaajate makstavaid
miinimumtasusid.
M3C2–3 Reform 2.1 –
Ühtse tolliliidese Eesmärk
Ühtset tolli käsitleva määruse
jõustumine
Ühtset tollipunkti
(Sportello Unico
PUUDUV
AD PUUDUVAD
PUUDUV
AD 4. kv
2021
Dekreedis määratakse kindlaks
ühtse tollipunkti meetodid ja
278
Järjekor
ra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaar
ium Eesmärk Nõuded
Aast
a
(„Sportello Unico
Doganale“)
rakendamine
Laud (Sportello
Unico Doganale)
Doganale)
käsitleva dekreedi
jõustumisele viitav
säte
kirjeldused kooskõlas määrusega
(EL) 1239/2019 Euroopa merenduse
ühtsete kontaktpunktide
rakendamise kohta ning Euroopa
Parlamendi ja nõukogu 15. juuli
2020. aasta määrusega (EL)
2020/1056 elektroonilise
kaubaveoteabe (eFTI) kohta.
M3C2–4
Reform 1.3 –
Külmtriikimistehast
e loamenetluste
lihtsustamine
Eesmärk
Külmtriikimistehas
te loamenetluste
lihtsustamise
jõustumine
Õigusnorm, mis
viitab
külmtriikimistehaste
loamenetluste
lihtsustamise
jõustumisele
PUUDUV
AD PUUDUVAD
PUUDUV
AD 4. kv 2022
Ühtlustada loamenetlust, et
lühendada maksimaalselt 12 kuuni
loa andmise aega selliste
energiatransporditaristute
ehitamiseks, mille eesmärk on
tarnida sildumisetapis laevadele
maismaalt elektrit (sekkumiste korral,
mille suhtes ei kohaldata
keskkonnamõju hindamist)
M3C2–5
Investeering 2.1 –
Logistikaahela
digitaliseerimine
Siht Logistikaahela
digiteerimine PUUDUVAD Number 0 12 2. kv 2024
Vähemalt 12 sadamasüsteemi
asutust 16st varustatakse
sadamakogukonna teabesüsteemi
teenustega, mis on
koostalitlusvõimelised Comando
Generale delle Capitanerie di Porto
ja/või Agenzia delle Dogane e dei
Monopoliga ning ühilduvad uue
Poola zlotiga (Piattaforma Logistica
279
Järjekor
ra-
number
Seotud meede
(reform või
investeering)
Eesmärk/s
iht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaar
ium Eesmärk Nõuded
Aast
a
Nazionale). Sadamasüsteemide
amet loetakse varustatuks
sadamateabesüsteemide
teenustega, kui vähemalt üks selle
sadamateabesüsteemi ameti sadam
on varustatud
sadamateabesüsteemidega.
M3C2–7 Investeering 2.3:
Külmtriikimine Eesmärk
Kõigi
riigihankelepingut
e sõlmimine
Pakkumiskutse
avaldamine ja kõigi
riigihankelepingute
sõlmimine
vähemalt 15
külmtriikimistehase
ehitamiseks
PUUDUV
AD PUUDUVAD
PUUDUV
AD 3. kv 2024
Pakkumiskutse avaldamine ja kõigi
lepingute sõlmimine vähemalt 15
sellise külmtriikimistehase
ehitamiseks, mis varustavad
elektrienergiaga vähemalt 10
sadamat.
M3C2–
12
Investeering 2.3:
Külmtriikimine Siht
Tööde
lõpuleviimine ja
ühenduskulude
prognooside
aktsepteerimine
arendaja poolt
külmtriikimise
taristute puhul.
Number 0 15 2. kv 2026
Vähemalt kümnes sadamas
vähemalt 15 külmtriikimise taristu
ehitustööde lõpetamise tõendid ja
liitumiskulude prognooside
aktsepteerimine arendaja poolt.
280
I.3. Laenuga seotud reformide ja investeeringute kirjeldus
Investeering 1.1: Rohelised sadamad: taastuvenergia ja energiatõhususega seotud sekkumised
sadamates
Meetme eesmärk on vähendada kasvuhoonegaaside heidet ja parandada õhukvaliteeti sadamates ja
sadamalinnades. See investeering seisneb selliste algatuste toetamises, mis võivad muu hulgas hõlmata
energiatõhususega seotud sekkumisi, taastuvenergia arendamist ning heiteta sõidukite ja teenistuspaatide
ostmist või fossiilkütustel töötavate sõidukite ja teenistuspaatide muutmist heiteta sõidukiteks.
Investeering 2.1: Logistikaahela digiteerimine
Selle investeeringu eesmärk on suurendada riikliku logistika konkurentsivõimet, lihtsustades menetlusi,
protsesse ja kontrolle ning keskendudes dokumentide elektroonilisele kujule ning andmete ja teabe
vahetamisele. See investeering seisneb koostalitlusvõimelise digitaalse süsteemi loomises avaliku ja
erasektori osalejate vahel kaubaveo ja logistika valdkonnas.
Investeering 2.2: Lennuliikluse korraldamise digitaliseerimine.
Selle investeeringu eesmärk on töötada välja uued vahendid aeronavigatsiooniteabe digiteerimiseks ning
mehitamata õhusõidukite platvormide ja teenuste rakendamiseks. Investeering hõlmab mehitamata
liikluskorraldussüsteemi (UTMS) arendamist ja ühenduvust, aeronavigatsiooniteabe digiteerimist ja uue
hooldusmudeli määratlemist.
Reform 2.2: Riikliku digitaalse logistika platvormi loomine kauba- ja/või reisijateveoteenuste
digiteerimiseks
Reformi eesmärk on muuta üksikute sadamasüsteemi asutuste sadamakogukonna teabesüsteemid
koostalitlusvõimeliseks riikliku digitaalse logistika platvormiga.
281
I.4. Laenu eesmärgid, sihid, näitajad ning seire ja rakendamise ajakava
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
M3C2–8
Investeering 1.1:
Rohelised
sadamad:
taastuvenergia ja
energiatõhususeg
a seotud
sekkumised
sadamates
Siht
Rohelised
sadamad:
tööde
üleandmine
PUUDUVAD Number 0 7 4. kv 2022
Tööde määramine vähemalt seitsmele
sadamasüsteemi asutusele. Ehitustööde
üleandmise valikumenetlus hõlmab järgmist:
a) rahastamiskõlblikkuse kriteeriumid, millega
tagatakse, et tööd vastavad põhimõtte „ei kahjusta
oluliselt“ tehnilistele suunistele (2021/C58/01) ning
asjakohastele ELi ja riiklikele keskkonnaalastele
õigusaktidele.
b) Kohustus, et investeeringu kliimapanus vastavalt
määruse (EL) 2021/241 VI lisas esitatud
metoodikale moodustab vähemalt 79 % taaste- ja
vastupidavusrahastust toetatavate investeeringute
kogukuludest.
C) kohustus esitada aruanne meetme rakendamise
kohta kava kehtivusaja keskel ja kava lõppedes.
M3C2–5bis
Investeering 2.1 –
Logistikaahela
digitaliseerimine
Siht Logistikaahela
digiteerimine PUUDUVAD Number 0 3 2. kv 2026
Viiakse läbi järgmised kolm sekkumist:
1) Logi-INi keskus: Digiplatvorm (Piattaforma
Logistica Nazionale – PLN) on veebis kättesaadav
ja juurdepääsetav asjaomastele ettevõtjatele
(sealhulgas sadamasüsteemi asutustele,
kaubaküladele ning kaubaveo- ja
282
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
logistikaettevõtjatele).
2) sadamate võrgustik ja kaubakülad:
Kõigil 16 sadamasüsteemi haldajal peavad olema
sadamateabesüsteemi teenused, mis ühilduvad
Piattaforma Logistica Nazionale (PLN) teenustega.
Sadamasüsteemide amet loetakse varustatuks
sadamateabesüsteemide teenustega, kui vähemalt
üks selle sadamateabesüsteemi ameti sadam on
varustatud sadamateabesüsteemidega. Need
arvutipõhise ettetellimissüsteemi teenused toimivad
kõigis põhisadamates, mis on kindlaks määratud
määruses (EL) 1679/2024.
Vähemalt 12 riigi kaubakülas peab olema Poola
zlotiga ühilduv kaubaveokülasüsteem.
3) Logi-IN äritegevus: ressursside ülekandmine
vähemalt 887 ettevõttele, et omandada või luua
digisüsteeme või digitaristuid, mis vastavad
kohaldataval juhul riiklikule eFTI platvormile ja
toetavad eCMR-tehnoloogia kasutuselevõttu.
M3C2–6 Investeering 2.2:
Lennuliikluse
korraldamise
Eesmärk Lennuliikluse
korraldamise
digitaliseerimi
Administratsio
oni poolt
heaks kiidetud
PUUDUV
AD PUUDUVAD
PUUDUV
1. kv 2026 Administratsioon kiidab heaks lõpparuanded
järgmise kolme projekti kohta:
283
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
digitaliseerimine ne lõpparuanded AD a) Liikluskorraldussüsteemide uus hooldusmudel
b) Digiteeritud lennundusteave
c) mehitamata liikluskorraldussüsteem ja -ühendus
(UTMS).
M3C2–9
Investeering 1.1:
Rohelised
sadamad:
taastuvenergia ja
energiatõhususeg
a seotud
sekkumised
sadamates
Siht
Kaupade
tarnimine,
ehitustööd ja
teenuste
osutamine
PUUDUVAD Number 0 75 2. kv 2026 Vähemalt 75 projektiga seotud kaupade tarnimine,
ehitustööde tegemine ja teenuste osutamine.
M3C2–10
Reform 2.2:
Riikliku digitaalse
logistika platvormi
loomine kauba-
ja/või
reisijateveoteenus
te digiteerimiseks
Eesmärk
Riiklik
digitaallogistik
a platvorm
Õigusakti säte,
mis viitab
õigusakti
jõustumisele
PUUDUV
AD PUUDUVAD
PUUDUV
AD 2. kv 2024
Sellise õigusakti jõustumine, millega tagatakse
sadamakogukonna süsteemide koostalitlusvõime
riikliku digitaalse logistika platvormiga.
Lisaks sätestatakse õigusaktis, et sadamasüsteemi
asutused on varustatud PCS standardteenustega
(sadamakogukonna süsteem), mis on
koostalitlusvõimelised asjaomaste
haldusasutustega ning kooskõlas ELi määrusega
1056/2020 ja riikliku digitaalse logistika
platvormiga.
284
J. 4. ÜLESANDE 1. KOMPONENT: Haridusteenuste osutamise tugevdamine:
lasteaedadest ülikoolideni
See Itaalia taaste- ja vastupidavuskava komponent hõlmab nelja sekkumisvaldkonda: i) haridus- ja
koolitusteenuste kvaliteedi parandamine ja kvantitatiivne laiendamine – alates lasteaedadest kuni
ülikoolideni; ii) õpetajaameti reform, eelkõige seoses värbamis- ja koolitusprotsessidega, et
suurendada õpetajate oskusi ja tegeleda territoriaalse mittevastavuse probleemiga; iii) taristu
täiendamine ja ajakohastamine, et edendada digi-, loodusteaduste, tehnoloogia, inseneriteaduste ja
matemaatika (STEM) ning mitmekeelsuse õpetamist, parandades samal ajal koolihoonete turvalisust
ja energiatõhusust; iv) kraadiõpperühmade reformimine, võimaldades kraadi- ja
doktoriõppeprogramme, et edendada rakendusuuringuid ja suurendada doktoriõppe stipendiumide
arvu. Selle komponendi meetmete eesmärk on kõrvaldada Itaalia haridus-, koolitus- ja teadussüsteemi
puudused, et parandada Itaalia õpilaste haridustulemusi ja tööalast konkurentsivõimet. Selle
komponendi raames tehtavad investeeringud ja reformid aitavad täita 2020. ja 2019. aastal Itaaliale
esitatud riigipõhiseid soovitusi vajaduse kohta „toetada naiste osalemist tööturul tervikliku strateegia
kaudu, sealhulgas kvaliteetse lapsehoiu kättesaadavuse kaudu“ (riigipõhine soovitus 2, 2019),
„parandada haridustulemusi, sealhulgas piisavate ja sihipäraste investeeringute kaudu, ning edendada
oskuste täiendamist, sealhulgas digioskuste tugevdamise kaudu“ (riigipõhine soovitus 2, 2019),
„edendada teadusuuringuid ja innovatsiooni“ (riigipõhine soovitus 3, 2019), „tugevdada kaugõpet ja -
oskusi, sealhulgas digioskusi“ (riigipõhine soovitus 2, 2020) ning „keskenduda investeeringutele
teadusuuringutesse ja innovatsiooni“ (riigipõhine soovitus 3, 2020).
J.1. Tagastamatu rahalise toetusega seotud reformide ja investeeringute kirjeldus
Investeering 1.1: Lasteaedu, eelkoole ning alusharidust ja lastehoiuteenuseid käsitlev kava
Selle investeeringu eesmärk on suurendada ja parandada 0–6aastaste laste haridusvõimalusi.
Investeering hõlmab lastehoiuasutuste ehitamist ja/või ümberehitamist ja/või renoveerimist.
Koolispordi infrastruktuuri parandamise kava
Meetme eesmärk on edendada sporditegevust koolides. Meede hõlmab koolis kasutatavate
spordirajatiste renoveerimist ja/või ehitamist.
Investeering 1.4: Erakorraline sekkumine, mille eesmärk on vähendada territoriaalseid
erinevusi keskkooli I ja II õppetsüklis ning võidelda koolist väljalangemise vastu
Meetme eesmärk on kõrvaldada lüngad õpilaste põhioskustes. Investeering hõlmab mentorlust ja
koolitustegevust haridussüsteemist varakult lahkumise ohus olevatele õpilastele ja noortele, kes on
juba koolist välja langenud, muu hulgas riikliku digiportaali toel.
285
Reform 1.1: Tehnika- ja kutseinstituutide reform
Reformi eesmärk on viia tehniliste ja kutseinstituutide õppekavad kooskõlla pädevustega, mida Itaalia
tootmissüsteem vajab, sealhulgas kohalikul tasandil. Eelkõige viiakse reformiga tehniline ja
kutseharidus kooskõlla tööstuse 4.0 ja digitaalse innovatsiooniga.
Reform 1.2: Kolmanda taseme kutseõppe reform
Reformi eesmärk on tugevdada kolmanda taseme kutseõppe süsteemi, lihtsustades intelligentsete
transpordisüsteemide juhtimist, et suurendada instituutide ja sisseastujate arvu, pidades silmas
kohalikku territooriumi. Reform peaks kaotama ebakõla tööjõu pakkumise ja nõudluse vahel.
Investeering 1.5: Kolmanda taseme kutseõppesüsteemi arendamine
Meetme eesmärk on suurendada kutseõppeasutuste rolli Itaalia haridussüsteemis. Investeering seisneb
üliõpilaste intelligentsetes transpordisüsteemides osalemise laiendamises ja ettevõtete hariduses
osalemise suurendamises, käivitades riikliku digiplatvormi, mis ühendab koolituse paremini
tööturuga.
Reform 1.3: Koolisüsteemi ümberkorraldamine
Reformil on kaks eesmärki:
1) Õpilaste arvu kohandamine klassi kohta.
Võttes arvesse rahvastiku vähenemist ja selleks, et vähendada õpilaste arvu klassi kohta ning järk-
järgult parandada õpilaste arvu ja ühistel ametikohtadel töötavate õpetajate arvu suhet, määratakse
õpetajate arv kindlaks samal tasemel kui 2020/2021. õppeaastal. Sekkumise rakendamine ei suurenda
olemasolevate hoonete arvu. Algatuses pööratakse individuaalset tähelepanu konkreetsetele õpilastele,
eelkõige kõige haavatavamatele ja kindlasti puuetega õpilastele. Õpilaste ja õpetajate suhtarvu
paranemine peaks parandama õpetamise kvaliteeti ja vahendite kättesaadavust koolihoonete jaoks.
Koolihoonete suurust käsitlevate eeskirjade läbivaatamine. Piirkondlik koolielanikkond võetakse
kasutusele „tõhusa parameetrina“ selliste haridusasutuste kindlaksmääramisel, millel on koolidirektor
ja koolidirektor, mitte konkreetse kooli elanikkond, nagu on sätestatud kehtivates õigusaktides.
Reform 1.4: „Suunamise“ süsteemi reform
Reformi eesmärk on võtta keskkooli neljanda ja viienda klassi jaoks kasutusele tutvustavad moodulid
(vähemalt 30 tundi aastas). Peamine eesmärk on toetada õppureid teadliku valiku tegemisel õpingute
jätkamise või täiendkutseõppe vahel enne nende tööturule integreerimist. Reformiga nähakse ette ka
digitaalse orientatsiooniplatvormi loomine, mis on seotud ülikoolide ja kutseõppeasutuste kolmanda
taseme hariduse pakkumisega.
Investeering 1.6: Aktiivne suunitlus kooli ja ülikooli vahelisel üleminekul
Meetme eesmärk on hõlbustada üleminekut keskkoolist ülikooli. Meede seisneb
gümnaasiumiõpilastele orientatsioonikursuste pakkumises, et toetada neid kolmanda taseme hariduse
valikul.
286
Investeering 1.7: Stipendiumid ülikooli pääsemiseks
Meetme eesmärk on suurendada võrdsust kolmanda taseme haridusele juurdepääsul, toetades sotsiaal-
majanduslikes raskustes õpilasi. Meede seisneb üliõpilastele antavate stipendiumide arvu
suurendamises.
Reform 1.5: Ülikoolidiplomi rühmade reformid
Reformiga nähakse ette ülikoolide õppekavade ajakohastamine, vähendades olemasolevaid jäiku piire,
mis piiravad tõsiselt võimalust luua valdkondadevahelisi teid. Samuti peaks reform laiendama
kutseõppeprogrammide rakendamise võimalust, võttes kasutusele uuenduslikud töösuunitlusega
kraadiõppekursused.
Reform 1.6: Ülikoolikraadireformi võimaldamine
Reformiga nähakse ette juurdepääsu lihtsustamine kutsealadele, mis nõuavad kutsealaste tellimuste
täitmist spetsiaalse kutseeksami kaudu. Meede aitab ühtlustada iga kraadi riikliku lõpueksami vastava
kutsejärjestuse eksamiga, sätestades seeläbi üldised ja selged eeskirjad ning asendades need.
Reform 2.1: Õpetajate värbamine
Reformi eesmärk on parandada haridustulemusi, täiustades õpetajate kvalifikatsiooni, värbamis-,
karjääri-, koolitus- ja hindamissüsteeme. See meede hõlmab õpetajate värbamist reformitud
värbamissüsteemi raames.
Reform 2.2: Kolmanda taseme hariduse ülemine aste ning koolijuhtide, õpetajate, haldus- ja
tehnilise personali kohustuslik koolitus
Reformi eesmärk on luua koolitöötajate jaoks kvaliteetne koolitussüsteem pidevaks kutsealaseks ja
karjäärialaseks arenguks. Selles nähakse ette kvalifitseeritud asutuse loomine, kes vastutab suuniste
avaldamise eest kooskõlas Euroopa standarditega ning koolitusalgatuste valimise ja koordineerimise
eest, sidudes need võimaluse korral karjääri edenemisega, nagu on ette nähtud värbamisreformis
(reform 2.1: Õpetajate värbamine, mis on lisatud kavasse.
Investeering 2.1: Integreeritud digitaalne õpetamine ja koolitöötajate koolitamine
digiülemineku valdkonnas
Meetme eesmärk on luua alaline süsteem digiõppeoskuste edendamiseks koolitöötajate seas.
Investeering seisneb koolijuhtide, õpetajate ja haldustöötajate koolitamises.
Investeering 3.1: Uued oskused ja uued keeled
Meetme eesmärk on parandada mitmekeelseid, loodusteaduste, tehnoloogia, inseneriteaduste ja
matemaatika valdkonna, digi- ja innovatsioonioskusi kõigil koolitasanditel. Meede seisneb
interdistsiplinaarsete loodusteaduste, tehnoloogia, inseneriteaduste ja matemaatika valdkonna
nõustamisprojektide käivitamises koolides ja programmi „Erasmus+“ laiendamises.
Investeering 3.2: Kool 4.0: innovaatilised koolid, juhtmestik, uued klassiruumid ja õpikojad
Selle meetme eesmärk on muuta koolirajatisi, et võimaldada digiõpet. Selle meetme raames
varustatakse vähemalt 8 000 alg- ja keskkooli digivahenditega, mis hõlmavad vähemalt 100 000
klassiruumi.
Investeering 3.4: Õpetamine ja kõrgtasemel ülikoolioskused
Selle meetme eesmärk on kvalifitseerida ja uuendada ülikooliprogramme, sealhulgas doktoriõpet, et
tugevdada digioskusi ja suurendada kõrghariduse ülemaailmset kaasatust. Investeering seisneb
287
doktoriõppe stipendiumide andmises, kõrgharidusasutuste võrgustike loomises, digiõppe keskuste
loomises ning rahvusvahelise koostöö ja projektide edendamises.
Reform 4.1: Doktorikraadiga programmide reform
Reformi eesmärk on ajakohastada doktoriõppe programme käsitlevat määrust, lihtsustada menetlusi
ettevõtete ja uurimiskeskuste kaasamiseks doktoriõppe programmidesse ning tugevdada
rakendusuuringuid. Kavandatud reform on seotud kõigi investeeringutega, mis on seotud doktoriõppe
programmidega sihtvaldkonnas „Haridus ja teadusuuringud“.
Investeering 4.1: Doktorikraadide arvu ja karjäärivõimaluste suurendamine (teadusuuringutele
orienteeritud, avalik haldus ja kultuuripärand)
Meetme eesmärk on suurendada teadusuuringutele, avalikule haldusele ja kultuuripärandile suunatud
inimkapitali hulka. Investeeringuga nähakse ette, et ülikoolid ja AFAM-i asutused eraldavad
üliõpilastele vähemalt 3 600 üldist doktoristipendiumi, vähemalt 3 000 doktoristipendiumi avaliku
halduse valdkonnas ja vähemalt 600 uut kultuuripärandile pühendatud doktoristipendiumi.
288
J.2. Tagastamatu rahalise toetuse eesmärgid, sihid, näitajad ning seire ja rakendamise ajakava
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaa
rium Eesmärk Nõuded Aasta
M4C1–1
Reform 1.5: Ülikooli
kraadiõppe rühmade
reform; Reform 1.6:
Ülikoolikraadide
reformi võimaldamine;
Reform 4.1:
Doktorikraadiga
programmide reform
Eesmärk
Kolmanda taseme
haridussüsteemi
reformide
jõustumine
haridustulemuste
parandamiseks
(esmased
õigusaktid)
järgmistes
valdkondades: a)
võimaldada
akadeemilist kraadi;
b) akadeemilise
kraadi rühmad; C)
doktoriõppeprogram
mide reform
Seaduse säte,
mis viitab
reformide
jõustumisele
PUUDUVAD PUUDUVAD PUUDUV
AD 4. kv 2021
Reformid hõlmavad vähemalt
järgmisi põhielemente: i) algatused ülikoolikraadi
rühmade reformimiseks, millega
nähakse ette suurem paindlikkus,
et vastata tööturu muutuvale
nõudlusele oskuste järele; ii) algatused, mille eesmärk on
reformida võimaldavaid
akadeemilisi kraade, et
lihtsustada ja kiirendada
juurdepääsu kutsealadele; iii) algatused rahvatervise
programmide reformimiseks, et
ettevõtteid paremini kaasata ja
edendada rakendusuuringuid; Meetmed kolmanda taseme
kutseõppesüsteemi
reformimiseks, sealhulgas
sidemete ja võimalike üleminekute
tugevdamine kutsekraadidega
(lauree professionalizzanti), et
rahuldada tööturu nõudlust
tehniliste pädevuste järele
M4C1–2
Investeering 1.7:
Stipendiumid ülikooli
pääsemiseks
Eesmärk
Ministri määruste
jõustumine, millega
reformitakse
stipendiume, et
Seaduse säte,
mis viitab reformi
jõustumisele
PUUDUVAD PUUDUVAD PUUDUV
AD 4. kv 2021
Ülikooli- ja teadusministeeriumi
poolt stipendiumide reformi kohta
vastu võetud ministri
käskkirjadega parandatakse
289
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaa
rium Eesmärk Nõuded Aasta
parandada
juurdepääsu
kolmanda taseme
haridusele
sotsiaal-majanduslikes raskustes
olevate andekate üliõpilaste
juurdepääsu kolmanda taseme
haridusele, suurendatakse
stipendiumide summat ja
toetusesaajate arvu kuni 31.
detsembrini 2024. Need õpilased
tuvastatakse ISEE – Indicatore
della Situazione Economica
Equivalente põhjal.
M4C1–3 Reform 2.1: Õpetajate
värbamine Eesmärk
Õpetajaameti
reformi jõustumine.
Seaduse säte,
mis viitab reformi
jõustumisele
PUUDUVAD PUUDUVAD PUUDUV
AD 2. kv 2022
Läbivaadatud õigusraamistik
meelitab ligi, värbab ja motiveerib
kvaliteetseid õpetajaid, eelkõige
järgmise kaudu: i) värbamissüsteemi parandamine ii) kõrgema kvalifikatsiooni
kasutuselevõtt õpetamises, et
asuda tööle keskkoolis; iii) õpetajate liigse liikuvuse
piiramine (õppe järjepidevuse
huvides); iv) karjääri edendamine, mis on
selgelt seotud tulemuslikkuse
hindamise ja pideva kutsealase
arenguga.
M4C1–4
Investeering 3.2: Kool
4.0: innovaatilised
koolid, juhtmestik,
uued klassiruumid ja
Eesmärk
Kool 4.0 Itaalia
koolisüsteemi
digiülemineku
edendamise kava
Haridusministeeri
um – käskkiri,
millega võetakse
vastu kooli 4.0
PUUDUVAD PUUDUVAD PUUDUV
AD 2. kv 2022
Haridusministeeriumi poolt vastu
võetud kava „School 4.0“, mille
eesmärk on edendada Itaalia
koolisüsteemi digiüleminekut,
290
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaa
rium Eesmärk Nõuded Aasta
õpikojad on vastu võetud kava sisaldab järgmist:
a) 100 000 klassiruumi muutmine
uuenduslikuks õpikeskkonnaks
b) laborite loomine uute
digitaalvaldkonna kutsealade
jaoks kõigis keskkoolides.
Meetmega a muudetakse
traditsioonilistele klassiruumidele
mõeldud kooliruumid
uuenduslikuks,
kohanemisvõimeliseks ja
paindlikuks õpikeskkonnaks, mis
on ühendatud ning ühendatud
digitaalse, füüsilise ja virtuaalse
tehnoloogiaga. Investeeringud
koolirajatistesse toovad kaasa
kõige uuenduslikuma
õpetamistehnoloogia (kodeerimis-
ja robootikaseadmed,
virtuaalreaalsuse seadmed,
kaasava hariduse jaoks mõeldud
täiustatud digiseadmed jne)
vähemalt 100 000 alg- ja
keskkooli klassiruumi, mida
kasutatakse õppetundideks.
Meetmega b luuakse igas
keskkoolis vähemalt üks
digivaldkonna kutsealade labor,
291
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaa
rium Eesmärk Nõuded Aasta
mis on tihedalt seotud ettevõtete
ja uuenduslike idufirmadega, et
luua uusi töökohti uute
digivaldkonna kutsealade sektoris
(nt tehisintellekt, robootika,
suurandmed ja küberturvalisus,
sinine ja roheline majandus).
Vähemalt 40 % toetust saavatest
koolidest peavad asuma Lõuna-
Itaalias.
M4C1–5
Reform 1.3:
Koolisüsteemi
ümberkorraldamine;
Reform 1.2:
Kolmanda taseme
kutseõppesüsteemi
reform; Reform 1.1:
Tehniliste ja
kutseinstituutide
reform; Reform 1.4:
„Suunitluse“ süsteemi
reform
Vahe-eesmärgid
Alg- ja
keskharidussüstee
mi reformide
jõustumine
haridustulemuste
parandamiseks
Seaduse säte,
mis viitab
reformide
jõustumisele
PUUDUVAD PUUDUVAD PUUDUV
AD 4. kv 2022
Esmaste õigusaktide reformid alg-
ja keskharidussüsteemis
haridustulemuste parandamiseks
(esmasete õigusaktide kaudu)
hõlmavad vähemalt järgmisi
põhielemente: i) algatused haridussüsteemi
korralduse reformimiseks, et
kohaneda demograafiliste
muutustega (nt koolide arv ning
õpilaste/õpetajate suhtarv) ii) algatused
orientatsioonisüsteemi
reformimiseks, et vähendada
koolist väljalangemise määra
kolmanda taseme hariduses; iii) algatused kutsekeskhariduse
tugevdamiseks (Istituti tecnico-
professionali), sealhulgas uue
292
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaa
rium Eesmärk Nõuded Aasta
õppekava vastuvõtmine ja nende
suunamine riikliku tööstuse 4.0
kava innovatsioonitulemustele
(Ministero dello Sviluppo
economico, Decreto 26 Maggio
2020); iv) algatused koolijuhtide,
õpetajate ning haldus- ja tehniliste
töötajate koolitamiseks ning
kolmanda taseme hariduse
edasijõudnute kooli loomine, et
parandada õpetamise kvaliteeti; v) Algatused selliste tegevuste,
meetodite ja sisu
integreerimiseks, mille eesmärk
on arendada ja tugevdada
teaduse, tehnoloogia, inseneeria
ja matemaatika (STEM)
valdkonna õppekavasid ning digi-
ja innovatsioonioskusi kõigis
haridustsüklites alates lasteaiast
kuni keskkoolini, et suurendada
eelkõige naiste osalemist STEM-
valdkonna kolmanda taseme
õppekavades.
Eesmärgi rahuldavaks täitmiseks
peavad õigusaktid sisaldama
kohustuslikke tähtaegu teiseste
õigusaktide, suuniste ja kõigi
293
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaa
rium Eesmärk Nõuded Aasta
vajalike õigusnormide
(haridusministeeriumi andmebaasi
järelevalve) väljaandmiseks, et
tagada sujuv rakendamine.
M4C1–6
Reform 2.2:
Kolmanda taseme
haridus ja jätkuõpe
koolijuhtidele,
õpetajatele, haldus- ja
tehnilistele töötajatele
Eesmärk
Selliste õigusaktide
jõustumine, mille
eesmärk on luua
kooli jaoks
kvaliteetne
koolitussüsteem.
Seaduse säte,
mis viitab
õigusakti
jõustumisele.
PUUDUVAD PUUDUVAD PUUDUV
AD 4. kv 2022
Õigusaktid sisaldavad sätteid,
mille eesmärk on luua
koolitöötajate jaoks kvaliteetne
koolitussüsteem, mis on
kooskõlas pideva kutsealase ja
karjääriarenguga, luua
koolitöötajate koolitamise suuniste
eest vastutav kvalifitseeritud
asutus, valida ja koordineerida
koolitusalgatusi ning siduda need
karjääri edenemisega, nagu on
ette nähtud värbamisreformis.
Esma- ja täiendusõppe süsteemi
rakendamine peaks võimaldama
üle saada koolitusvõimaluste
praegusest killustatusest, millel
praegu puudub ühtne riiklik
strateegia.
M4C1–7
Investeering 1.4:
Erakorraline
sekkumine, mille
eesmärk on
vähendada
territoriaalseid
erinevusi keskkooli I
Siht
Üliõpilased või
noored, kes on
osalenud
mentorlustegevuses
või koolituskursustel
PUUDUVAD Number 0 820 000 3. kv 2025
Vähemalt 820 000 toetusesaajale
antakse välja mentorlus- ja
koolitustegevuses osalemise
tõend. Keskhariduses väheneb koolist
väljalangemise määr, jõudes
2019. aastal ELi keskmisele
294
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaa
rium Eesmärk Nõuded Aasta
ja II õppetsüklis ning
võidelda koolist
väljalangemise vastu
tasemele (10,2 %), nagu näitab
ISTAT.
M4C1–8
Investeering 1.3:
Koolispordi
infrastruktuuri
parandamise kava
Eesmärk
Lepingute
sõlmimine
sekkumisteks koolis
kasutatavate
spordirajatiste ja
võimlate
ehitamiseks ja
renoveerimiseks
Teade
rahastamiskõlblik
e sekkumistega
seotud
riigihankelepingut
e sõlmimise kohta
PUUDUVAD PUUDUVAD PUUDUV
AD 1. kv 2024
Lepingute sõlmimine
spordirajatiste ja koolides
kasutatavate spordisaalide
ehitamiseks ja renoveerimiseks
pärast avalikku
pakkumismenetlust.
M4C1–9
Investeering 1.1:
Lasteaedu, eelkoole
ning alusharidust ja
lastehoiuteenuseid
käsitlev kava
Eesmärk
Lasteaedade ja
eelkoolide ning
alushariduse ja
lastehoiuteenuste
ehitamist,
renoveerimist ja
nende turvalisuse
tagamist käsitlevate
lepingute sõlmimine
Kohalike
omavalitsuste
toetusesaajate
teavitamine
riigihankelepingut
e sõlmimise
rahastamisest
esimese
rahastamiskõlblik
e sekkumiste
kogumi puhul
PUUDUVAD PUUDUVAD PUUDUV
AD 2. kv 2023
Lasteaedu ja eelkoole ning
alusharidust ja lastehoiuteenuseid
käsitlevate lepingute sõlmimine ja
territoriaalne jaotus Lepingud
sõlmitakse kooskõlas „ei kahjusta
oluliselt“ tehniliste suunistega
(2021/C58/01), kasutades
välistamisnimekirja ning nõuet
järgida asjaomaseid ELi ja riiklikke
keskkonnaalaseid õigusakte.
M4C1–10
Reform 2.1: Õpetajate
töölevõtmine; Reform
1.3: Koolisüsteemi
ümberkorraldamine;
Reform 1.2:
Kolmanda taseme
Eesmärk
Määruste
jõustumine kõigi
põhi-, kesk- ja
kolmanda taseme
hariduse reforme
käsitlevate
Seaduse säte,
mis viitab
määruste
jõustumisele.
PUUDUVAD PUUDUVAD PUUDUV
AD 4. kv 2023
Teisesed õigusaktid sisaldavad
kõiki vajalikke eeskirju, et tõhusalt
rakendada ja kohaldada kõiki
meetmeid, mis on seotud alg-,
kesk- ja kolmanda taseme
295
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaa
rium Eesmärk Nõuded Aasta
kutseõppesüsteemi
reform; Reform 1.4:
„Suunamise“
süsteemi reform;
Reform 1.5: Ülikooli
kraadiõppe rühmade
reform; Reform 1.6:
Ülikoolikraadide
reformi võimaldamine
meetmete tõhusaks
rakendamiseks ja
kohaldamiseks, kui
see on vajalik
hariduse reformidega:
– Kolmanda taseme
haridussüsteemi reformid
haridustulemuste parandamiseks
(esmased õigusaktid) järgmistes
valdkondades: a) võimaldada
akadeemilist kraadi; b)
akadeemilise kraadi rühmad; C)
doktoriõppeprogrammide reform;
– Ministri dekreedid stipendiumide
reformimiseks, et parandada
juurdepääsu kolmanda taseme
haridusele;
– Õpetajakutse reform;
– Põhi- ja keskharidussüsteemi
reformid haridustulemuste
parandamiseks;
– Õigusaktide eesmärk oli luua
koolidele kvaliteetne
koolitussüsteem.
M4C1–10 bis
Reform 1.1: Tehnika-
ja kutseinstituutide
reform
Eesmärk Teiseste õigusaktide
jõustumine.
Seaduse säte,
mis viitab teiseste
õigusaktide
jõustumisele.
PUUDUVAD PUUDUVAD PUUDUV
AD 4. kv 2024
Jõustusid teisesed õigusaktid
tehniliste ja kutseinstituutide
reformi kohta.
M4C1–11 Investeering 1.7:
Stipendiumid ülikooli Siht Ülikoolistipendium PUUDUVAD Number 0 55 000 4. kv 2023 Vähemalt 55 000 üliõpilasele
antakse stipendiume, mida
296
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaa
rium Eesmärk Nõuded Aasta
pääsemiseks rahastatakse üksnes taaste- ja
vastupidavusrahastu vahenditest.
M4C1–12
Investeering 4.1:
Doktorikraadide arvu
ja karjäärivõimaluste
suurendamine
(teadusuuringutele
orienteeritud, avalik
haldus ja
kultuuripärand)
Siht
Doktoriõppe
stipendiumiprogram
mid
PUUDUVAD Number 0 7 200 4. kv 2024
Kolme aasta jooksul antakse
vähemalt 3 600 üldist
doktoristipendiumi, vähemalt
3 000 doktoristipendiumi avaliku
halduse valdkonnas ja vähemalt
600 kultuuripärandiga seotud
doktoristipendiumi.
M4C1–13
Investeering 2.1:
Integreeritud
digitaalne õpetamine
ja koolitöötajate
koolitamine
digiülemineku
valdkonnas
Siht
Koolijuhtide,
õpetajate ja
haldustöötajate
koolitamine
PUUDUVAD Number 0 650 000 4. kv 2025
Digiõpet ja digiüleminekut
käsitlevatel koolituskursustel
osalemise tunnistused antakse
välja vähemalt 650 000
toetusesaajale.
M4C1–14
Reform 2.1: Õpetajate
värbamine Siht
Reformitud
värbamissüsteemig
a tööle võetud
õpetajad
PUUDUVAD Number 0 20 000 4. kv 2024
Reformitud värbamissüsteemis on
tööle võetud vähemalt 20 000
õpetajat
M4C1–14a Reform 2.1: Õpetajate
värbamine Siht
Reformitud
värbamissüsteemi
raames värvatud
õpetajad
PUUDUVAD Number 0 20 000 3. kv 2025
Reformitud värbamissüsteemis
võetakse tööle vähemalt 20 000
õpetajat
M4C1–14b Reform 2.1: Õpetajate Eesmärk Dekreedid, millega
kiidetakse heaks
Õpetajate avalike
konkursside PUUDUVAD PUUDUVAD PUUDUV 2. kv 2026 Dekreedid, millega kiidetakse
heaks nimekirjad vähemalt 70 000
297
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaa
rium Eesmärk Nõuded Aasta
värbamine õpetajate avalike
konkursside
nimekirjad
nimekirju
kinnitavate
dekreetide
vastuvõtmine
AD kandidaadile, kes on edukalt
läbinud avaliku konkursi, et saada
õpetajateks pärast reformitud
värbamissüsteemi, sealhulgas
40 000 õpetajale, kes on tööle
võetud sihtmärkide M4C1–14 ja
M4C1–14a raames.
M4C1–15
Investeering 1.7:
Stipendiumid ülikooli
pääsemiseks
Siht
Ülikooli
pääsemiseks
antavad
stipendiumid
PUUDUVAD Number 0 55 000 4. kv 2024
Vähemalt 55 000 üliõpilasele
antakse stipendiume, mida
rahastatakse üksnes taaste- ja
vastupidavusrahastu vahenditest
M4C1–15a
Investeering 1.7:
Stipendiumid ülikooli
pääsemiseks
Siht
Ülikooli
pääsemiseks
antavad
stipendiumid
PUUDUVAD Number 0 83 000 2. kv 2026
Vähemalt 83 000 üliõpilasele
antakse stipendiume, mida
rahastatakse üksnes taaste- ja
vastupidavusrahastu vahenditest.
M4C1–16
Investeering 3.1:
Uued oskused ja
uued keeled
Eesmärk
Teaduse,
tehnoloogia,
inseneeria ja
matemaatika
(STEM) projektide
aktiveerimiseks
toetuse andmise
otsuse(te)
vastuvõtmine
Toetuse andmise
otsuse(te)
vastuvõtmine
PUUDUVAD PUUDUVAD PUUDUV
AD 2. kv 2025
Toetuse andmise otsuse(te)
vastuvõtmine STEM-projektide
käivitamiseks vähemalt 8 000
koolis.
M4C1–17
Investeering 3.1:
Uued oskused ja
uued keeled
Eesmärk Uued oskused
Toetuse andmise
otsuse(te)
vastuvõtmine
PUUDUVAD PUUDUVAD PUUDUV
AD 2. kv 2025
Toetuse andmise otsuse(te)
vastuvõtmine:
i. Koolitöötajatele mõeldud
298
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaa
rium Eesmärk Nõuded Aasta
keele- ja/või metoodiliste kursuste aktiveerimine vähemalt 8 000 koolis.
ii. Üliõpilastele ja/või koolitöötajatele suunatud programmi „Erasmus+“ tugevdamine 2023., 2024. ja 2025. aastal.
M4C1–19
Investeering 3.2: Kool
4.0: innovaatilised
koolid, juhtmestik,
uued klassiruumid ja
õpikojad
Eesmärk
Digiseadmete
ostmiseks ja/või
digilaborite
loomiseks toetuse
andmise otsuse(te)
vastuvõtmine
Toetuse andmise
otsuse(te)
vastuvõtmine
PUUDUVAD PUUDUVAD PUUDUV
AD 2. kv 2025
Toetuse andmise otsuse(te)
vastuvõtmine klassiruumide
muutmiseks uuenduslikuks
keskkonnaks ja/või digitaalsete
laborite loomiseks vähemalt 8000
koolis.
M4C1–20
Investeering 1.5:
Kolmanda taseme
kutseõppesüsteemi
arendamine
Siht
Kutseõppesüsteemi
s osalevate õpilaste
arv
PUUDUVAD Number 0 11 000 1. kv 2026
Vähemalt 11 000 õpilast, kes on
kantud ITSi akadeemia
kutseõppesüsteemi riiklikku
registrisse 2024/2025. ja
2025/2026. õppeaastal.
Intelligentsete
transpordisüsteemide riiklik
digiplatvorm on veebipõhine ja
juurdepääsetav, nagu on
kinnitanud Verbale di collaudo.
M4C1–22
Investeering 1.3:
Koolispordi
infrastruktuuri
parandamise kava
Siht
Koolis kasutatavate
spordirajatiste
ehitamine või
renoveerimine
PUUDUVAD Number 0 300 2. kv 2026
Haldustõendid, mis kinnitavad
vähemalt 300 koolis kasutatava
spordirajatise ehitamist või
renoveerimist.
299
Järjekorra-
number
Seotud meede (reform
või investeering) Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
M4C1–23
Investeering 3.4:
Õpetamine ja
kõrgtasemel
ülikoolioskused
Eesmärk
Meetmed
keskkoolide ja
ülikooliprogrammi
de, sealhulgas
doktorikraadi
omandamiseks ja
uuendamiseks.
Dekreet,
lepingud,
partnerlused
PUUDUVAD PUUDUVAD PUUDUV
AD 2. kv 2026
Dekreedi andmine vähemalt 500 uue
doktorikraadi omandamiseks ülikoolide
käivitatud programmides, mis
keskenduvad digi- ja keskkonnaalasele
üleminekule.
Allkirjastatakse lepingud (Atti d’obbligo)
kolme digiõppe keskuse (DEH)
rahaliseks toetamiseks.
Kolme kõrgkoolide võrgustiku lepingud
(„Atti d’obbligo“) allkirjastatakse.
Allkirjastatakse vähemalt kümme
partnerlust, mida tõendab „Atti
d’obbligo“, millega luuakse
riikidevahelisi haridusalgatusi.
Allkirjastatakse lepingud (Atti d’obbligo),
millega toetatakse rahaliselt vähemalt
15 AFAMi asutuste rahvusvahelistumise
projekti.
M4C1–24
Investeering 1.6:
Aktiivne orienteerumine
kooli ja ülikooli
vahelisele üleminekule.
Siht
Kooli-ülikooli
üleminekukursust
e jaoks välja
antud
osalemistunnistu
sed
PUUDUVAD Number 0 1 000 000 2. kv 2026
Keskkooliõpilastele, kes on
registreeritud õppeaastatel 2022/2023–
2025/2026, on välja antud vähemalt
1 000 000 kooliõpingutes osalemise
tunnistust.
300
J.3. Laenuga seotud reformide ja investeeringute kirjeldus
Reform 1.7: Üliõpilaste eluasemete reguleerimise reform ja investeeringud üliõpilaste
eluasemetesse
Reformi eesmärk on ülikooli- ja teadusministeeriumi toetusel suurendada üliõpilaste majutusvõimalusi,
soodustades era- ja avaliku sektori investeeringuid rajatistesse.
Investeering seisneb üliõpilastele täiendavate majutusvõimaluste pakkumises.
Investeering 1.1: Lasteaedu, eelkoole ning alusharidust ja lastehoiuteenuseid käsitlev kava
Selle investeeringu eesmärk on suurendada ja parandada 0–6aastaste laste haridusvõimalusi. Investeering
hõlmab lastehoiuasutuste ehitamist ja/või ümberehitamist ja/või renoveerimist.
Investeering 1.2: Täistööajaga töötamise pikendamise kava
Meetme eesmärk on võimaldada koolidel pikendada koolitunde, renoveerides või ehitades sobivaid taristuid.
Investeering seisneb kooliruumides sööklaruumide renoveerimises või ehitamises.
Investeering 3.3: Koolihoonete turvalisuse ja struktuurilise rehabilitatsiooni kava
Meetme eesmärk on suurendada koolihoonete ja/või -rajatiste ohutust ja energiatõhusust. Meede hõlmab
sekkumisi, mille eesmärk on suurendada koolihoonete ja/või -rajatiste ohutust või energiatõhusust.
Investeering 5: Üliõpilaste eluasemefond
See meede hõlmab avaliku sektori investeeringut toetuskavasse, et stimuleerida erainvesteeringuid ja
parandada Itaalias üliõpilaste eluasemesektori juurdepääsu rahastamisele. Abikava raames antakse toetusi
otse erasektorile ja sarnase tegevusega tegelevatele avaliku sektori asutustele.
Skeemi haldab rakenduspartnerina Cassa Depositi e Prestiti S.p.A. (CDP S.p.A.). Kava hõlmab järgmist
tooteseeriat:
• Üliõpilase voodikoha jaoks luuakse kuni 20 000 euro suurune kindlasummaline toetus.
Kavasse tehtava investeeringu rakendamiseks allkirjastavad Itaalia ja CDP S.p.A. rakenduslepingu, mis
sisaldab järgmist:
1. Kava otsustusprotsessi kirjeldus: Kava lõpliku rahastamisotsuse teeb investeerimiskomitee või
muu asjakohane samaväärne juhtorgan ja see kiidetakse heaks valitsusest sõltumatute liikmete
häälteenamusega.
2. Seotud toetuspoliitika põhinõuded,mis hõlmavad järgmist:
a. Investeeringu sotsiaalsed nõuded, sealhulgas:
i. Nõue, et üliõpilaste renditasu peab olema vähemalt 15 % madalam kohaliku turu hindadest.
ii. Nõue, et 30 % uutest kohtadest tuleb reserveerida üliõpilastele, kellel on sotsiaal-
majanduslikke raskusi, nagu on määratlenud organisatsioonid „Diritto allo Studio“ (õigus
õppida organisatsioonidel).
iii. Nõuet, et asjaomase projektikonkursi väljakuulutamise ajal üliõpilaste eluasemeks
kasutatavaid olemasolevaid majutuskohti ei saa rahastada.
b. Antud toetuste ja rahastamiskõlblike lõplike abisaajate kirjeldus.
c. Nõue, et kõik toetatavad investeeringud peavad olema majanduslikult elujõulised.
301
d. Nõue järgida põhimõtet „ei kahjusta oluliselt“, nagu on sätestatud põhimõtte „ei kahjusta
oluliselt“ tehnilistes suunistes (2021/C58/01). Eelkõige jäetakse toetuspõhimõtetega
rahastamiskõlblikkuse alt välja järgmised tegevused ja varad: i) fossiilkütustega seotud tegevus ja
varad, sealhulgas allkasutus, ii) ELi heitkogustega kauplemise süsteemi73 (HKS) alla kuuluvad
tegevused ja varad, millega saavutatakse prognoositud kasvuhoonegaaside heide, mis ei ole
asjaomastest võrdlusalustest väiksem,74 iii) prügilate, jäätmepõletustehaste ja mehaanilis-
bioloogilise töötlemise jaamadega seotud tegevus75 ja varad76. Kahtluste vältimiseks ei ole
gaasikatlad käesoleva meetme alusel toetuskõlblikud.
e. Nõue, et kava lõplikud abisaajad ei tohi samade kulude katmiseks saada toetust muudest liidu
vahenditest.
3. Rakenduslepinguga hõlmatud summa, rakenduspartneri tasude struktuur ja nõue kasutada kava
kasutamata tulu, sealhulgas pärast 2026. aastat, samadel poliitilistel eesmärkidel.
4. Seire-, auditi- ja kontrollinõuded, sealhulgas:
1. Rakenduspartneri kasutatud toetustest aruandmise järelevalvesüsteemi kirjeldus.
2. Rakenduspartneri selliste menetluste kirjeldus, millega tagatakse pettuste,
korruptsiooni ja huvide konfliktide ennetamine, avastamine ja kõrvaldamine.
3. Kohustus kontrollida enne tegevuse jaoks toetuse andmist iga tegevuse
rahastamiskõlblikkust kooskõlas rakenduslepingus sätestatud nõuetega.
4. Kohustus teha riskipõhiseid järelauditeid kooskõlas CDP strateegilise arengukava
auditikavaga. Nende audititega kontrollitakse i) kontrollisüsteemide tõhusust,
sealhulgas pettuste, korruptsiooni ja huvide konflikti avastamist; ii) põhimõtte „ei
kahjusta oluliselt“ järgimine, riigiabi eeskirjad; ning iii) järgitakse nõuet, et kava
lõplikud abisaajad ei tohi olla saanud samade kulude katmiseks toetust muudest
liidu vahenditest. Auditite käigus kontrollitakse ka tehingute seaduslikkust ja
kohaldatavate rakenduslepingu toetuslepingute tingimuste täitmist.
73 Välja arvatud a) varad ja tegevused maagaasi kasutavas elektri- ja/või soojusenergia tootmises ning sellega seotud
ülekande- ja jaotustaristus, mis vastavad põhimõtte „ei kahjusta oluliselt“ tehniliste suuniste (2021/C58/01) III lisas
sätestatud tingimustele, ning b) alapunktis ii osutatud tegevused ja varad, mille puhul fossiilkütuste kasutamine on
fossiilkütustevabale käitamisele õigeaegseks üleminekuks ajutine ja tehniliselt vältimatu. 74 Kui toetatava tegevusega saavutatakse prognoositud kasvuhoonegaaside heide, mis ei ole asjaomastest võrdlusalustest
oluliselt väiksem, esitatakse selgitus selle kohta, miks see ei ole võimalik. Saastekvootide tasuta eraldamise
võrdlusalused saastekvootidega kauplemise süsteemi kohaldamisalasse kuuluvate tegevuste jaoks on sätestatud
komisjoni rakendusmääruses (EL) 2021/447. 75 Välistamist ei kohaldata meetme tegevuste suhtes, mis toimuvad üksnes ringlussevõetamatute ohtlike jäätmete
töötlemisega tegelevates jaamades, ega olemasolevate jaamade suhtes, kui meetme tegevuste eesmärk on suurendada
energiatõhusust, koguda heitgaase ladustamiseks või kasutamiseks või taaskasutada põletustuhas leiduvaid materjale,
tingimusel et need tegevused ei suurenda jaamade jäätmetöötlusvõimsust ega pikenda nende kasutusiga; tõendid selle
kohta tuleb esitada iga jaama kohta eraldi. 76 Välistamist ei kohaldata meetme tegevuste suhtes, mis toimuvad olemasolevates mehhaanilis-bioloogilise töötlemise
jaamades, kus nende tegevuste eesmärk on suurendada energiatõhusust või moderniseerida eraldatud jäätmete
ringlussevõttu biojäätmete kompostimiseks ja biojäätmete anaeroobseks lagundamiseks, tingimusel et need tegevused ei
suurenda jaamade jäätmetöötlusvõimsust ega pikenda nende kasutusiga; tõendid selle kohta tuleb esitada iga jaama
kohta eraldi.
302
J.4. Laenu eesmärgid, sihid, näitajad ning seire ja rakendamise ajakava
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium
Eesmär
k Nõuded Aasta
M4C1–18
Investeering 1.1:
Lasteaedu, eelkoole
ning alusharidust ja
lastehoiuteenuseid
käsitlev kava
Siht
Alushariduse ja
lapsehoiu kohad 0–
6aastastele lastele.
PUUDUVAD Number 0 150 480 2. kv 2026
0–6aastastele lastele mõeldud
alusharidus- ja lapsehoiuteenuste
raames on ehitatud, renoveeritud või
kasutusotstarbe muutmisest, hoonete
laiendamisest või lammutamisest ja
rekonstrueerimisest tulenevalt vähemalt
150 480 uut kohta, millest kuni 35 000
kohta tuleneb olemasolevate kohtade
lammutamisest ja rekonstrueerimisest.
Investeering ei hõlma maagaasikatelde
hankimist.
M4C1–21
Investeering 1.2:
Täistööajaga
töötamise
pikendamise kava
Siht
Söökla ehitamine
ja/või renoveerimine
koolides
PUUDUVAD Number 0 1 000 2. kv 2026
Haldustõendid, mis kinnitavad, et
koolides on ehitatud ja/või renoveeritud
vähemalt 1 000 sööklat.
M4C1–26
Investeering 3.3:
Koolihoonete
turvalisuse ja
struktuurilise
rehabilitatsiooni
kava
Siht
Ohutust ja/või
energiatõhusust
suurendavad
sekkumised
PUUDUVAD Number 0 1 400 2. kv 2026
Haldussertifikaadid, mis kinnitavad, et on
võetud meetmeid vähemalt 1 400
koolihoone ja/või -rajatise ohutuse ja/või
energiatõhususe suurendamiseks.
Investeering ei hõlma maagaasikatelde
hankimist.
M4C1–27
Reform 1.7:
Üliõpilaste
eluasemete
reguleerimise
reform ja
Eesmärk
Üliõpilaste majutust
käsitlevate kehtivate
eeskirjade muutmist
käsitlevate
õigusaktide
Seaduse säte, mis
viitab õigusakti
jõustumisele.
PUUDUVAD PUUDUVAD PUUDU
VAD 4. kv 2021
Muudetud õigusaktis: Muuta kehtivaid üliõpilaste eluaseme
eeskirju (seadus 338/2000 ja
seadusandlik dekreet 68/2012), et:
303
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium
Eesmär
k Nõuded Aasta
investeeringud
üliõpilaste
eluasemetesse
jõustumine. (1). Hoonete ümberstruktureerimise ja
renoveerimise edendamine uute
hoonestamata hoonete asemel
(kuhjamise osakaal on suurem, praegu
50 %), mille puhul tagatakse esitatud
projektidega kõrgeimad
keskkonnastandardid;
(2). Lihtsustada, muu hulgas tänu
digitaliseerimisele, projektide esitamist ja
valikut ning seega ka rakendamise
ajastust;
(3) Sätestada õigusaktiga erand
seaduses nr 338/2000 sätestatud
kriteeriumidest seoses kaasrahastamise
protsendimääraga, mida võib anda.
Viiakse ellu reform, millega lisatakse
Itaalia üliõpilaste eluaseme rahastamist
käsitlevasse õigusraamistikku järgmised
olulised muudatused:
1. Rahastamises osalemise
võimaldamine ka erainvestoritele
(vastavalt rakendamises kirjeldatud
kavale), võimaldades ka avaliku ja
erasektori partnerlusi, kus ülikool
kasutab olemasolevaid rahalisi
vahendeid üliõpilaste eluasemetesse
tehtavate kinnisvarainvesteeringute
304
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium
Eesmär
k Nõuded Aasta
finantstasakaalu toetamiseks;
2. Erainvesteeringute pikaajalise
jätkusuutlikkuse tagamine, tagades
maksustamiskava muutmise
hotelliteenuste suhtes kohaldatavalt
kavalt sotsiaaleluruumide suhtes
kohaldatavale kavale, piirates uute
majutuskohtade kasutamist üliõpilaste
majutuse eesmärgil akadeemilisel aastal,
kuid lubades kasutada struktuure, kui
need ei ole üliõpilaste majutuseks
vajalikud. See omakorda aitab pakkuda
taskukohase üüriga uut liiki majutust.
Seada rahastamise ja täiendavate
maksusoodustuste (nt võrdne kohtlemine
sotsiaaleluruumidega) tingimuseks uute
majutuskohtade kasutamine üliõpilaste
eluasemete jaoks kogu
investeerimisperioodi jooksul ja
üliõpilastelt nõutava üüri kokkulepitud
ülempiiri järgimine isegi pärast selliste
spetsiaalsete rahastamiskavade
kehtivuse lõppemist, mis aitavad kaasa
eraettevõtjate investeeringute
käivitamisele. Üliõpilaste majutuse
standardite ümbermääratlemine,
määrates uuesti kindlaks seadusest
tulenevad nõuded seoses ühisruumiga
305
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium
Eesmär
k Nõuded Aasta
õpilase kohta hoonetes vastutasuks
paremini varustatud (ühtsete) ruumide
eest.
M4C1–28
Reform 1.7:
Üliõpilaste
eluasemete
reguleerimise
reform ja
investeeringud
üliõpilaste
eluasemetesse
Eesmärk
Täiendavate
majutuskohtade
(voodikohad) loomist
käsitlevate esialgsete
lepingute sõlmimine
Lepingute
avaldamine
ministeeriumi
veebisaidil
PUUDUVAD PUUDUVAD PUUDU
VAD 2. kv 2023
Täiendavate magamiskohtade
(voodikohtade) loomiseks esialgsete
lepingute sõlmimine“;
M4C1–29
Reform 1.7:
Üliõpilaste
eluasemete
reguleerimise
reform ja
investeeringud
üliõpilaste
eluasemetesse
Eesmärk
Üliõpilaste
eluasemeid
käsitlevate
õigusaktide reformi
jõustumine.
Seaduse säte, mis
viitab reformi
jõustumisele.
PUUDUVAD PUUDUVAD PUUDU
VAD 4. kv 2022
Reform hõlmab järgmist: 1)
rahastamises osalemise avamine ka
erainvestoritele, võimaldades ka avaliku
ja erasektori partnerlusi, kus ülikool
kasutab olemasolevaid rahalisi
vahendeid üliõpilaste eluasemetesse
tehtavate kinnisvarainvesteeringute
finantstasakaalu toetamiseks; (2).
Erainvesteeringute pikaajalise
jätkusuutlikkuse tagamine, tagades
maksustamiskava muutmise
hotelliteenuste suhtes kohaldatavalt
kavalt sotsiaaleluruumide suhtes
kohaldatavale kavale, piirates uute
majutuskohtade kasutamist üliõpilaste
majutuse eesmärgil akadeemilisel aastal,
kuid lubades kasutada struktuure, kui
306
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium
Eesmär
k Nõuded Aasta
need ei ole üliõpilaste majutuseks
vajalikud; (3). Seada rahastamise ja
täiendavate maksusoodustuste (nt
võrdne kohtlemine sotsiaaleluruumidega)
tingimuseks uute majutuskohtade
kasutamine üliõpilaste eluasemete jaoks
kogu investeerimisperioodi jooksul ja
üliõpilastelt nõutava üüri kokkulepitud
ülempiiri järgimine isegi pärast
spetsiaalsete rahastamiskavade
aegumist, mis aitavad kaasa
eraettevõtjate investeeringute
käivitamisele; (4). Üliõpilaste majutuse
standardite ümbermääratlemine,
määrates uuesti kindlaks seadusest
tulenevad nõuded seoses ühisruumiga
õpilase kohta hoonetes vastutasuks
paremini varustatud (ühtsete) ruumide
eest.
M4C1–30
Reform 1.7:
Üliõpilaste
eluasemete
reguleerimise
reform ja
investeeringud
üliõpilaste
eluasemetesse
Siht
Loodud on üliõpilaste
magamisasemeüksus
ed
PUUDUVAD Number 0 30 000 2. kv 2026
Tööde lõpetamise tõendid, mis on välja antud kooskõlas ministri 26. veebruari 2024. aasta dekreediga nr 481, mida on muudetud 21. mai 2026. aasta korraldusega nr 10, milles kinnitatakse, et loodud on vähemalt 30 000 uut magamisasemeüksust. Asjaomase projektikonkursi väljakuulutamise ajal ei saa üliõpilaste
307
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium
Eesmär
k Nõuded Aasta
eluasemeks kasutatavaid olemasolevaid majutuskohti eesmärgi saavutamisel arvesse võtta. 2024. aasta konkursikutses nõutakse, et 30 % uutest kohtadest reserveeritakse üliõpilastele, kellel on sotsiaal- majanduslikke raskusi, nagu on määratlenud organisatsioonid „Diritto allo Studio“ (õigus õppida organisatsioonidel). Kõnealuses konkursikutses nõutakse ka, et üliõpilastele kehtestataks renditasu, mis on vähemalt 15 % madalam kohaliku turu hindadest. Investeering ei hõlma maagaasikatelde hankimist.
M4C1–31 Investeering 5:
Üliõpilaste
eluasemefond
Eesmärk Rakenduskokkulepe. Rakenduskokkule
ppe jõustumine
PUUDUVAD
PUUDUVAD PUUDU
VAD
4. kv 2025 Rakenduskokkuleppe jõustumine.
M4C1–32 Investeering 5:
Üliõpilaste
eluasemefond
Eesmärk Lõplike abisaajatega
sõlmitud juriidilised
lepingud ja
investeeringute
lõpuleviimine
Allkirjastatud
õiguslikud
kokkulepped ja
üleandmise tõend
PUUDUVAD PUUDUVAD PUUDU
VAD
2. kv 2026 Cassa Depositi e Prestiti S.p.A. peab olema sõlminud lõplike toetusesaajatega seaduslikud toetuslepingud summas, mis on vajalik, et kasutada 100 % taaste- ja vastupidavusrahastu investeeringust kavasse (võttes arvesse haldustasusid).
Itaalia kannab rahastu jaoks üle 599 000 000 eurot ettevõttele Cassa Depositi e Prestiti S.p.A.
308
K. MISSIOON 4 KOMPONENT 2: Teadusuuringutest ettevõteteni
Selle Itaalia taaste- ja vastupidavuskava komponendi eesmärk on toetada investeeringuid
teadusuuringutesse ja innovatsiooni, edendada innovatsiooni ja tehnoloogia levikut, tugevdada oskusi
ning toetada üleminekut teadmistepõhisele majandusele. Sellega toetatakse riiklikku teadussüsteemi,
teadlaste oskusi ja liikuvust ning avaliku ja erasektori koostööd riiklikul ja ELi tasandil. See tugineb
kolmele peamisele sambale: i) parem teadusbaas; ii) tugevad äri- ja teadussidemed (teadmiste ja
tehnoloogiasiire; iii) Äriinnovatsiooni toetamine (eelkõige VKEd, idufirmad).
Selle komponendi raames tehtavad investeeringud ja reformid aitavad täita 2020. ja 2019. aastal
Itaaliale esitatud riigipõhiseid soovitusi vajaduse kohta „keskenduda investeeringutega seotud
majanduspoliitikas teadusuuringutele ja innovatsioonile ning taristu kvaliteedile“ (riigipõhine soovitus
3, 2019), „edendada erainvesteeringuid majanduse taastumise soodustamiseks“ (riigipõhine soovitus
3, 2020), „keskenduda investeeringutes rohe- ja digipöördele, eelkõige teadusuuringutele ja
innovatsioonile“ (riigipõhine soovitus 3, 2020).
K.1. Tagastamatu rahalise toetusega seotud reformide ja investeeringute kirjeldus
Investeering 1.2: Noorte teadlaste esitatud projektide rahastamine
Selle investeeringu eesmärk on hoida noori teadlasi Itaalias. Meede seisneb noorte teadlaste
teadustegevuse toetamises.
Investeering 2.2a: Innovatsioonilepingud
Meetme eesmärk on edendada innovatsiooni. Meede hõlmab teadus-, arendus- ja
innovatsiooniprojektide määratlemist (nn innovatsioonilepingud) valdkondades, mis on kooskõlas
programmi „Euroopa horisont“ II sambaga, nagu on sätestatud määruses (EL) 2021/695.
Investeering 3.3: Doktoriõppe stipendiumide andmine koostöös ettevõtetega
Meetme eesmärk on parandada kõrgetasemelisi oskusi, sealhulgas peamiste progressi võimaldavate
tehnoloogiate valdkonnas.
Meede hõlmab doktoriõppestipendiumide andmist ülikoolide ja AFAMi asutuste poolt, millesse on
kaasatud ettevõtted. Täpsemalt nähakse meetmega, mida rakendab MUR – ülikooli- ja
teadusministeerium, ette kokku 6 000 doktoriõppetoetuse andmine kolme aasta jooksul koos
erasektori kaasrahastamisega.
Reform 1.1: Teadusuuringute ja innovatsiooni toetusmeetmete rakendamine lihtsustamise ja
liikuvuse edendamiseks
Reformi viivad ellu ülikoolide ja teadusuuringute ministeerium (MUR) ning majandusarengu
ministeerium (MiSE), luues ministeeriumidevahelise juhtnõukogu ja andes välja kaks ministri
dekreeti: i) suurendada ja toetada kõrgetasemeliste isikute liikuvust (stiimulitega) (näiteks: teadlased
ja juhtivtöötajad) ülikoolide, teadustaristute ja ettevõtete vahel ning ii) lihtsustada teadusfondide
haldamist, iii) reformida teadlaste karjäärivõimalusi, et suurendada nende keskendumist
teadustegevusele.
309
Reformiga minnakse üle süsteemsemale lähenemisviisile teadus- ja arendustegevusele, minnes
kaugemale praegusest ressursside ümberjaotamise loogikast, eelistades jagamisel põhinevat
lähenemisviisi, ning keskendutakse bürokraatia lihtsustamisele avaliku ja erasektori teadusuuringutele
eraldatud vahendite haldamisel, avaldades märkimisväärset mõju prioriteetide hajutamise ja
killustumise vältimise kaudu, mida toetab ka missiooni esimene komponent. Riiklikel teadusasutustel
on oluline roll nii partnerluste, riiklike kampaaniate ja territoriaalsete ökosüsteemide võimalike
projektijuhtidena kui ka võimalike osalejatena broneeringuinfo fondi ja infrastruktuurifondi
projektikonkurssidel.
Reform 1.2: Teadusuuringute rahastamise kolmeaastane kava
Reformi eesmärk on parandada teadusuuringute rahastamise kavandamist ja prognoositavust. See
tähendab, et jõustuvad esmased õigusaktid, millega kehtestatakse õigusraamistik teadusuuringute
rahastamise kolmeaastase kava vastuvõtmiseks.
310
K.2. Tagastamatu rahalise toetuse eesmärgid, sihid, näitajad ning seire ja rakendamise ajakava
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi
kirjeldus
Mõõtühik Lähtestsenaariu
m Eesmärk Nõuded
Aast
a
M4C2–1
Investeering 1.2:
Noorte teadlaste
esitatud projektide
rahastamine
Siht
Teadusstipendiumi
saanud üliõpilaste
arv
PUUDUVAD Number 50 300 4. kv 2022
Üliõpilastele antakse
vähemalt 300
teadusstipendiumi.
Valikumenetlus hõlmab
rahastamiskõlblikkuse
kriteeriume, millega
tagatakse, et valitud
projektid vastavad
põhimõtte „ei kahjusta
oluliselt“ tehnilistele
suunistele (2021/C58/01),
kasutades
välistamisnimekirja ning
nõuet järgida asjakohaseid
ELi ja riiklikke
keskkonnaalaseid
õigusakte.
Eesmärgi rahuldaval
täitmisel võetakse arvesse
ka seda, et tööle võetakse
vähemalt 300 noort
teadlast.
M4C2–1a
Investeering 1.2:
Noorte teadlaste
esitatud projektide
rahastamine
Eesmärk
Noortele teadlastele
toetuse andmist
käsitleva(te)
määruse(te)
avaldamine
Dekreetide
avaldamine
PUUDUVA
D PUUDUVAD PUUDUVAD 2. kv 2025
Avaldatakse dekreet
(dekreedid), millega
eraldatakse rahalisi
vahendeid vähemalt 550
noore teadlase toetamiseks.
311
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi
kirjeldus
Mõõtühik Lähtestsenaariu
m Eesmärk Nõuded
Aast
a
Noored teadlased järgivad
järgmisi tingimusi: vanus
kuni 40 aastat
konkursikutse avaldamise
kuupäeval (profiilid, mis on
projektikonkursi avaldamise
kuupäeval 40 aastat vanad,
on rahastamiskõlblikud kuni
41aastaseks saamiseni) või
41–45aastaste profiilide
puhul, mis on läbinud
doktorikraadi kuni seitse
aastat tagasi (profiilid, mis
on projektikonkursi
avaldamise kuupäeval 45
aastat vanad, on
rahastamiskõlblikud kuni
46aastaseks saamiseni).
M4C2–2bis
Investeering 2.2a:
Innovatsioonileping
ud
Siht
Innovatsioonileping
ud, mille puhul
ettevõtjate ja
Itaalias valmistatud
toodete
ministeerium on
kinnitanud, et
toetusesaajad on
lõpparuannete
edastamisega nõus
PUUDUVAD Number 0 32 4. kv 2025
Ettevõtluse ja Itaalias
valmistatud toodete
ministeeriumi kinnitus selle
kohta, et toetusesaajad on
nõus esitama lõpparuanded
vähemalt 32
innovatsioonilepingu kohta,
mis hõlmavad vähemalt
ühte järgmistest
sekkumisvaldkondadest:
o tootmistehnoloogia;
312
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi
kirjeldus
Mõõtühik Lähtestsenaariu
m Eesmärk Nõuded
Aast
a
o peamised
digitehnoloogiad,
sealhulgas
kvanttehnoloogiad;
o progressi
võimaldavad
kujunemisjärgus
tehnoloogiad;
o kõrgtehnoloogilised
materjalid;
o tehisintellekt ja
robootika;
o ringtööstus;
o vähese CO2-heitega
ja keskkonnasõbralik
tööstus;
o mittenakkuslikud ja
harvikhaigused;
o nakkushaigused,
sealhulgas
vaesusega seotud ja
unarhaigused;
o tervise- ja
hooldusvaldkonna
313
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi
kirjeldus
Mõõtühik Lähtestsenaariu
m Eesmärk Nõuded
Aast
a
töövahendid,
tehnoloogiad ja
digilahendused,
kaasa arvatud
personaalmeditsiin;
o tööstusrajatised
energiasüsteemi
ümberkujundamisel;
o tööstuse
konkurentsivõime
transpordisektoris;
o keskkonnasõbralik,
ohutu ja kättesaadav
transport ja liikuvus;
o arukas liikuvus;
o energia
salvestamine;
o toidusüsteemid;
o bioressursipõhised
innovatsioonisüstee
mid liidu
biomajanduses;
o ringsüsteemid.
314
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi
kirjeldus
Mõõtühik Lähtestsenaariu
m Eesmärk Nõuded
Aast
a
Innovatsioonilepingud, mille
puhul ettevõtjate ja Itaalias
valmistatud toodete
ministeerium on kinnitanud,
et toetusesaajad nõustuvad
lõpparuannete
edastamisega, peavad
olema kooskõlas põhimõtte
„ei kahjusta oluliselt“
tehniliste suunistega
(2021/C58/01).
M4C2–3
Investeering 3.3:
Doktoriõppe
stipendiumide
andmine koostöös
ettevõtetega ja
teadlaste
töölevõtmise
edendamine
ettevõtetes
Siht Doktoriõppe
stipendiumide arv PUUDUVAD Number 0 6 000 4. kv 2024
Vähemalt 6 000 doktoriõppestipendiumi andmine ülikoolide ja AFAMi asutuste poolt.
Doktorikraadi andmise olulised nõuded on järgmised:
a) nägema ettevõttes ette õppe- ja teadustöö perioodid minimaalselt kuuest (6) kuust kuni maksimaalselt kaheksateistkümne (18) kuuni;
b) ette näha õppe- ja teadustöö perioodid välismaal vähemalt kuuest (6) kuust kuni maksimaalselt
315
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi
kirjeldus
Mõõtühik Lähtestsenaariu
m Eesmärk Nõuded
Aast
a
kaheksateistkümne (18) kuuni;
c) näha ette ettevõtete kaasamine koolituskursuse määratlemisse ka ülikoolide ja AFAMi asutustega tehtava laiema koostöö kontekstis.
M4C2–4
Reform 1.1:
Teadus- ja
arendustegevust
toetavate
meetmete
rakendamine
lihtsustamise ja
liikuvuse
edendamiseks
Eesmärk
Jõustub ministri
dekreet teadus- ja
arendustegevuse
lihtsustamise ja
liikuvuse kohta, mis
on seotud
tavapärase
rahastamisfondiga.
Määruse säte,
mis viitab
seaduse
jõustumisele
PUUDUVA
D PUUDUVAD 2. kv 2022
Ministri käskkirjad
sisaldavad järgmisi
põhielemente:
i) minna üle süsteemsemale
lähenemisviisile teadus- ja
arendustegevusele uue
lihtsustatud mudeli abil,
mille eesmärk on saavutada
märkimisväärne mõju,
vältides prioriteetide
hajutamist ja killustumist; ii)
reformida õigusakte, et
suurendada
kõrgetasemeliste isikute (nt
teadlased ja juhid) liikuvust
ülikoolide, teadustaristute ja
ettevõtete vahel; iii) fondide
haldamise lihtsustamine; iv)
reformida teadlaste
karjäärivõimalusi, et
suurendada nende
keskendumist
316
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi
kirjeldus
Mõõtühik Lähtestsenaariu
m Eesmärk Nõuded
Aast
a
teadustegevusele.
M4C2–4bis
Reform 1.2:
Teadusuuringute
rahastamise
kolmeaastane kava
Eesmärk
Esmased
õigusaktid
teadusuuringute
rahastamise
kolmeaastase kava
vastuvõtmiseks
Teadusuuringu
te rahastamise
kolmeaastase
kava
sätestavate
esmaste
õigusaktide
jõustumine
PUUDUVA
D PUUDUVAD PUUDUVAD 4. kv 2025
Reformiga nõutakse, et
jõustuksid esmased
õigusaktid, millega
kehtestatakse
õigusraamistik, et võtta
vastu kolmeaastane kava
edasiarendamistegevuse
rahastamiseks.
Õigusraamistikuga:
1) Luua fond eri rahastamisvahendite ühendamiseks;
2) nõuda ülikoolide,
teadusüksuste ja
AFAMi asutuste
teadustegevuse
rahastamise
kolmeaastase kava
vastuvõtmist;
3) Nõuda
projektikonkursside
algatamise ja nende
valikumenetluste
lõpuleviimise ajakava
(„cronoprogramma“)
vastuvõtmist.
4) Lisada eraldi
eelarvepunkt PRIN-
projektide
317
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi
kirjeldus
Mõõtühik Lähtestsenaariu
m Eesmärk Nõuded
Aast
a
rahastamiseks.
318
K.3. Laenuga seotud reformide ja investeeringute kirjeldus
Investeering 1.1: Olulist riiklikku huvi pakkuvad teadusprojektid (PRIN)
Meetme eesmärk on toetada teadustegevust. Meede seisneb suurt riiklikku huvi pakkuvate teadusprojektide
(PRIN) rahastamises, mis hõlmab ülikoolide uurimisüksuste ja teadusasutuste vahelist koostööd ning
tähtajalise lepinguga teadlaste palkamist.
Investeering 1.3: Ülikoolidele, uurimiskeskustele ja ettevõtetele laiendatud partnerlused ning
alusuuringute projektide rahastamine
Meetme eesmärk on luua ülikoolide, teadusorganisatsioonide ja muude sidusrühmade võrgustikke, edendada
tehnosiiret ning toetada teaduspõhiseid idufirmasid ja võrsefirmasid. Meetme raames rahastatakse vähemalt
14 suurt alusuuringute programmi, mida viivad läbi avalik-õiguslikud ja eraõiguslikud võrgustikud.
Investeering 1.4: „Riiklike teadus- ja arendustegevuse liidrite“ loomine mõnede peamiste progressi
võimaldavate tehnoloogiate valdkonnas
Selle meetme eesmärk on luua riiklikud teadus- ja arendustegevuse juhid. Meetme raames rahastatakse viit
riiklikku teaduskeskust, mis keskenduvad teadusuuringutele peamistes tehnoloogiavaldkondades, mis võivad
muu hulgas hõlmata kõrgjõudlusega andmetöötlust, põllumajandustehnoloogiat, geeniteraapiat ja RNA-
põhiste ravimite väljatöötamist, kestlikku liikuvust ja bioloogilist mitmekesisust.
Investeering 1.5: „Jätkusuutlikkust toetavad innovatsiooni ökosüsteemid“, millega luuakse „teadus- ja
arendustegevuse territoriaalsed liidrid“.
Selle meetme eesmärk on edendada innovatsiooni. Meede seisneb olemasolevate või uute innovatsiooni
ökosüsteemide rahastamises.
Investeering 2.1: Üleeuroopalist huvi pakkuvad tähtsad projektid
Meetme eesmärk on täiendada praegust üleeuroopalist huvi pakkuvate tähtsate projektide fondi, millele on
osutatud 2020. aasta eelarveseaduse artikli 1 lõikes 232. Meetme eesmärk on toetada üleeuroopalist huvi
pakkuvate tähtsate projektide fondi lisavahenditega.
Investeering 2.3: Tehnosiirde keskused
Meetme eesmärk on toetada keskuste võrgustikku (pädevuskeskused, Euroopa digitaalse innovatsiooni
keskus, kvaliteedimärgis, riiklikud digitaalse innovatsiooni keskused), mis vastutab vähemalt ühe järgmise
eest: projektide arendamine, kõrgtehnoloogiliste teenuste osutamine ettevõtetele ja haldusasutustele ning
tehnosiirde teenused.
Taaste- ja vastupidavusrahastust rahastatakse ainult vähemalt 32 keskust ilma toetuseta muudest ELi
allikatest. Taaste- ja vastupidavusrahastust ning programmist „Digitaalne Euroopa“ kaasrahastatakse 13
Euroopa digitaalse innovatsiooni keskust. Iga Euroopa digitaalse innovatsiooni keskuse tegevus
struktureeritakse tööpakettideks. Taaste- ja vastupidavusrahastust rahastatakse ainult teatavaid tööpakette,
samas kui ülejäänud tööpakette rahastatakse programmist „Digitaalne Euroopa“.
Investeering 3.1: Teadusuuringute ja innovatsiooni taristud
Meetme eesmärk on toetada tööstust ja akadeemilisi ringkondi ühendavate teadus- ja innovatsioonitaristute
loomist või ajakohastamist või toetada olemasolevaid taristuid. Investeering seisneb olemasolevate või uute
taristuprojektide rahastamises koos teadusjuhiga iga taristu puhul.
Investeering 3.2: Omakapitalisüst digipöörde fondi, mida haldab CDP Venture Capital SGR
Meetme eesmärk on toetada Itaalia majanduse kasvupotentsiaali, stimuleerides erainvesteeringuid,
parandades idufirmade juurdepääsu rahastamisele ja arendades riskikapitaliturgu selles sektoris. Meede
319
seisneb 400 000 000 euro suuruses omakapitalisüstis digipöörde fondi, mida haldab CDP Venture Capital
SGR.
CDP Venture Capital SGR võtab vastu omakapitali kasutamise investeerimispoliitika. Investeerimispoliitika
sisaldab finantstoode(t)e kirjeldust koos rahastamiskõlblike lõplike abisaajate eeldatava liigiga, mida
omakapitalist eeldatavasti toetatakse, sealhulgas rakendamise eeldatavat 15-aastast ajakava ja maksimaalselt
13 % suurust haldustasu77. DTF tegutseb omakapitali, kvaasiomakapitali, võla või kvaasivõla otsese või
kaudse toetamise kaudu78. CDP Venture Capital SGR võtab omakapitali kasutamiseks vastu auditi- ja
kontrollisüsteemi, mida on kirjeldatud suunistes „Linee Guida per le attività di rendicontazione e controllo
dei Fondi DTF e GTF“. Investeerimispoliitikas nõutakse, et finantstoode (-tooted), mida omakapitaliga
toetatakse, vastaks olulise kahju ärahoidmise põhimõttele, nagu on sätestatud põhimõtte „ei kahjusta
oluliselt“ tehnilistes suunistes (2021/C58/01). Eelkõige idufirmade üldise toetamise korral jäetakse
investeerimispoliitikast välja äriühingud, kes keskenduvad peamiselt79 järgmistele sektoritele: i)
fossiilkütustel põhinev energiatootmine ja sellega seotud tegevus80; ii) energiamahukad ja/või suure CO2-
heitega tööstusharud81; iii) saastavate sõidukite tootmine, rentimine või müük82; iv) jäätmete kogumine,
töötlemine ja83 kõrvaldamine, v) tuumkütuse töötlemine, tuumaenergia tootmine. Lisaks nõutakse
investeerimispoliitikas vastavust asjakohastele ELi ja riiklikele keskkonnaalastele õigusaktidele.
77 Eelkõige ei hõlma 13 % ülempiir teenitud huvi, DTFiga seotud tulemustasusid ja
kõik kaudsete investeeringute/kolmandate isikute vahenditega seotud kulud ja haldustasud. 78 Eelkõige otseinvesteeringute puhul tegutseb DTF omakapitali või kvaasiomakapitali toetuse andmise kaudu;
kaudsete investeeringute korral rahastab DTF kolmandate isikute fonde, mis toimivad, pakkudes vähemalt ühte
järgmistest: omakapital või kvaasiomakapital või võlainstrumendid või kvaasivõlainstrumendid. 79 Lõplikul abisaajal on „oluline fookus“ sektorile või äritegevusele, kui seda sektorit või tegevust peetakse lõpliku
abisaaja äritegevuse oluliseks osaks vastavalt seoses lõpliku abisaaja brutotulu, kasumi või kliendibaasiga. Piiratud
sektorist või tegevusest saadav brutotulu ei tohi mingil juhul ületada 50 % brutotulust. 80 Välja arvatud a) varad ja tegevused maagaasi kasutavas elektri- ja/või soojusenergia tootmises ning sellega seotud
ülekande- ja jaotustaristus, mis vastavad põhimõtte „ei kahjusta oluliselt“ tehniliste suuniste (2021/C58/01) III lisas
sätestatud tingimustele, ning b) alapunktis ii osutatud tegevused ja varad, mille puhul fossiilkütuste kasutamine on
fossiilkütustevabale käitamisele õigeaegseks üleminekuks ajutine ja tehniliselt vältimatu. 81 Sealhulgas ELi heitkogustega kauplemise süsteemi (HKS) alla kuuluvad tegevused ja varad, millega saavutatakse
prognoositud kasvuhoonegaaside heide, mis ei ole asjaomastest võrdlusalustest väiksem. Kui toetatava tegevusega
saavutatakse prognoositud kasvuhoonegaaside heide, mis ei ole asjaomastest võrdlusalustest oluliselt väiksem,
esitatakse selgitus selle kohta, miks see ei ole võimalik. Saastekvootide tasuta eraldamise võrdlusalused
saastekvootidega kauplemise süsteemi kohaldamisalasse kuuluvate tegevuste jaoks on sätestatud komisjoni
rakendusmääruses (EL) 2021/447. 82 Saastavad sõidukid on määratletud heiteta sõidukitena. 83 Seda erandit ei kohaldata meetmete suhtes, mida võetakse tehastes, mis on ette nähtud üksnes ringlussevõetamatute
ohtlike jäätmete töötlemiseks, ja olemasolevates tehastes, kui käesoleva meetme kohaste meetmete eesmärk on
suurendada energiatõhusust, koguda heitgaase ladustamiseks või kasutamiseks või taaskasutada põletustuhast saadud
materjale, tingimusel et sellised käesoleva meetme kohased meetmed ei suurenda tehaste jäätmetöötlusvõimsust ega
pikenda nende kasutusiga; tõendid selle kohta tuleb esitada iga jaama kohta eraldi.
320
K.4. Laenu eesmärgid, sihid, näitajad ning seire ja rakendamise ajakava
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
M4C2–5
Investeering
1.1: Olulist
riiklikku huvi
pakkuvad
teadusprojektid
(PRIN)
Siht
Toetust saanud
teadusprojektide
arv
PUUDUVAD Number 0 3 150 4. kv 2023
Vähemalt 3 150 teadusprojekti
„Progetti di Ricerca di
Interesse Nazionale “ auhind.
Lepingud konkurentsipõhiste
projektikonkursside alusel
välja valitud projektidega
sõlmitakse kooskõlas
põhimõtte „ei kahjusta
oluliselt“ tehniliste suunistega
(2021/C58/01), kasutades
välistamisnimekirja ning nõuet
järgida asjakohaseid ELi ja
riiklikke keskkonnaalaseid
õigusakte.
M4C2–6
Investeering
1.1: Olulist
riiklikku huvi
pakkuvad
teadusprojektid
(PRIN)
Eesmärk
Projektide
väljavalimist
käsitleva(te)
dekreeti(de)
avaldamine
Dekreetide
avaldamine PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2025
Avaldatakse dekreet
(dekreedid), millega
määratakse vähemalt 5 350 riiklikku huvi pakkuvat
teadusprojekti (Progetti di
Ricerca di Interesse
Nazionale).
Projektikonkurssides
täpsustatakse, et projekti
321
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
kestus on vähemalt kaks
aastat ning see nõuab
ülikoolide teadusüksuste ja
teadusasutuste vahelist
koostööd.
M4C2–7
Investeering
1.1: Olulist
riiklikku huvi
pakkuvad
teadusprojektid
(PRIN)
Siht
Tööle võetud
tähtajalise
lepinguga
teadlaste arv
PUUDUVAD Number 0 900 2. kv 2025
Tööle võetakse vähemalt 900
tähtajalise lepinguga teadlast.
Palgatud teadlaste tegevus
hõlmab teemasid, mis on
kooskõlas Euroopa
teadusuuringute ja
innovatsiooni raamprogrammi
(2021–2027) kuue
teemavaldkonnaga.
M4C2–8
Investeering
1.3:
Ülikoolidele,
teaduskeskustel
e ja ettevõtetele
laiendatud
partnerlused
ning
alusuuringute
projektide
rahastamine
Siht
Sõlmitud
teaduspartnerlus
te arv
PUUDUVAD Number 0 14 2. kv 2025
Lepingute allkirjastamine („atto d’obbligo“) vähemalt 14 teaduspartnerluse puhul. Konkursikutsetes nõutakse järgmist: a) iga partnerlus, mille raames võetakse tööle vähemalt 100 tähtajalise lepinguga teadlast; b) Kohustus, et investeeringu kliimapanus vastavalt määruse (EL) 2021/241 VI lisas esitatud metoodikale moodustab vähemalt 42 %
322
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
taaste- ja vastupidavusrahastust toetatavate investeeringute kogukuludest.
M4C2–9
Investeering
1.4: „Riiklike
teadus- ja
arendustegevus
e liidrite“
loomine
mõnede
peamiste
progressi
võimaldavate
tehnoloogiate
valdkonnas
Siht
Riiklikud
keskused, mille
kohta on
väljastatud
tegevusaruanne
PUUDUVAD Number 0 5 2. kv 2026 Iga viie riikliku keskuse kohta
esitatakse tegevusaruanne.
M4C2–10
Investeering
2.1:
ÜLEEUROOPA
LIST HUVI
PAKKUV
TÄHTIS
PROJEKT
Eesmärk
Osalemiskutse
avaldamine
riiklike
projektide,
sealhulgas
üleeuroopalist
huvi pakkuvate
tähtsate
projektide
Osalemiskutse on
avaldatud PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2021
Toetust saavaid üleeuroopalist
huvi pakkuvaid tähtsaid
projekte ajakohastatakse
eeldatavasti sõltuvalt
käimasolevate riiklike
üleeuroopalist huvi pakkuvate
tähtsate projektide menetluste
tegelikust arenguetapist ja
riigiabist teatamise menetluse
323
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
mikroelektroonik
a projektide
kindlaksmääram
iseks
arenguetapist.
Valitud üleeuroopalist huvi
pakkuvas tähtsas projektis
käsitletakse konkreetseid
innovatiivseid tööstussektoreid
kooskõlas juba kindlaks
määratud Euroopa
väärtusahelatega.
See sekkumine hõlmab nii
juba heaks kiidetud
üleeuroopalist huvi pakkuvaid
tähtsaid projekte kui ka
tulevasi projekte, nagu
pilvandmetöötlus, tervishoid,
reamaterjalid ja
küberturvalisus.
Konkursikutse tingimused
sisaldavad järgmist:
a) rahastamiskõlblikkuse kriteeriumid, millega tagatakse, et valitud projektid vastavad põhimõtte „ei kahjusta oluliselt“ tehnilistele suunistele (2021/C58/01), kasutades välistamisnimekirja
324
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
ning nõuet järgida asjakohaseid ELi ja riiklikke keskkonnaalaseid õigusakte. b) Kohustus, et investeeringu kliimapanus vastavalt määruse (EL) 2021/241 VI lisas esitatud metoodikale moodustab vähemalt 40 % taaste- ja vastupidavusrahastust toetatavate investeeringute kogukuludest. c) Kohustus, et investeeringu digipanus vastavalt määruse (EL) 2021/241 VII lisas esitatud metoodikale moodustab vähemalt 60 % taaste- ja vastupidavusrahastust toetatava investeeringu kogukuludest. d) kohustus esitada aruanne meetme rakendamise kohta kava kehtivusaja keskel ja kava lõppedes.
M4C2–11
Investeering
2.1:
ÜLEEUROOPA
LIST HUVI
Eesmärk
Jõustub riiklik
õigusakt, millega
eraldatakse
vajalikud
Siseriikliku
õigusakti säte, mis
viitab õigusakti
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2022
Siseriiklikus õigusaktis
sätestatakse projektide
esitamise kord ja tähtajad ning
võimalike toetusesaajate
325
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
PAKKUV
TÄHTIS
PROJEKT
rahalised
vahendid
projektis
osalejate
toetamiseks.
jõustumisele juurdepääsunõuded.
M4C2–12
Investeering
2.1:
ÜLEEUROOPA
LIST HUVI
PAKKUV
TÄHTIS
PROJEKT
Eesmärk
Üleeuroopalist
huvi pakkuvate
tähtsate
projektide
osalejate
nimekiri valmib
30. juuniks
2023.
Osalejate
nimekirja
avaldamine
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2023
Loetelu sisaldab lubatud
isikuid, kes osalevad
üleeuroopalist huvi
pakkuvates tähtsates
projektides pärast esitatud
projektide kontrollimist ja
hindamist, mis viiakse läbi
kooskõlas põhimõtte „ei
kahjusta oluliselt“ tehniliste
suunistega (2021/C58/01),
kasutades välistamisnimekirja
ning nõuet järgida
asjakohaseid ELi ja riiklikke
keskkonnanõudeid.
M4C2–14
Investeering
2.3: Tehnosiirde
keskused
Siht
Väljamaksed
rahalise
väärtusega
309000000
eurot
PUUDUVAD EUR 0 309 000 000 2. kv 2026
Vähemalt 45 keskusele,
kellega ministeerium on
sõlminud rahastamislepingud,
väljastatakse maksekorraldusi
kogusummas vähemalt
309 000 000 eurot.
326
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
Lepingutes 13 Euroopa
digitaalse innovatsiooni
keskusega, mida
kaasrahastatakse
programmist „Digitaalne
Euroopa“, täpsustatakse
taaste- ja
vastupidavusrahastust
rahastatavad tööpaketid.
13 Euroopa digitaalse
innovatsiooni keskuse puhul
puudutavad
maksekorraldused tööpakette,
mida rahastatakse üksnes
taaste- ja
vastupidavusrahastust.
Ettevõtluse ja Itaalias
valmistatud toodete
ministeerium annab kinnituse,
et abisaajad on nõus lõplike
valmimisaruannete
edastamisega vähemalt 45
keskuse kohta.
M4C2–16 Investeering
3.1: Siht Rahastatud PUUDUVAD Number 0 30 2. kv 2023 Vähemalt 30 infrastruktuuri,
mida rahastatakse teadus- ja
327
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
Teadusuuringut
e ja
innovatsiooni
taristud
taristute arv innovatsioonitaristu
integreeritud süsteemi jaoks. Innovatsioonitaristu hõlmab
mitmeotstarbelisi taristuid, mis
suudavad hõlmata vähemalt
kolme teemavaldkonda: i)
kvanttehnoloogia, ii)
kõrgtehnoloogilised materjalid,
iii) fotoonika, iv) bioteadused,
v) tehisintellekt, vi)
energiasüsteemi
ümberkujundamine.
Eesmärgi rahuldav täitmine
sõltub ka sellest, kas teadus-
ja innovatsioonitaristu
integreeritud süsteemi jaoks
võetakse tööle vähemalt 30
teadusjuhti.
M4C2–16 bis
Investeering
3.1:
Teadusuuringut
e ja
innovatsiooni
taristud
Siht
Teadusuuringute
ja innovatsiooni
infrastruktuurid,
mille kohta on
koostatud
tegevusaruanne
PUUDUVAD Number 0 30 2. kv 2026
Vähemalt 30 teadus- või
innovatsioonitaristu projekti
kohta esitatakse
tegevusaruanded.
328
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
M4C2–17
Investeering
3.1: Teadus- ja
innovatsioonitar
istu
integreeritud
süsteemi
loomise fond;
Investeerimisek
s
Eesmärk
Lepingute
sõlmimine
projektide puhul,
mis käsitlevad:
a) Teadus- ja
innovatsioonitari
stute
integreeritud
süsteem
Lepingute
sõlmimisest
teatamine
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2022
Teade lepingute sõlmimise
kohta projektikonkursside
alusel välja valitud
projektidega kooskõlas
põhimõtte „ei kahjusta
oluliselt“ tehniliste suunistega
(2021/C58/01), kasutades
välistamisnimekirja ning nõuet
järgida asjakohaseid ELi ja
riiklikke keskkonnaalaseid
õigusakte.
Taotlused valitakse välja
järgmiste kriteeriumide alusel:
juhtpositsioon
teaduses/tehnoloogias/innovat
sioonis, nende
innovatsioonipotentsiaal (nii
avatud innovatsiooni/avatud
andmete kui ka
ettevõttesisese arengu
seisukohast), nende vastavus
teemavaldkondadele või
uudsetele murrangulistele
arengutele, nende
translatiivsed ja
innovatsioonikavad, tööstuse
329
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
kui avatud innovatsiooni
partneri ja/või kasutaja toetus,
äritegevuse arendamise
meetmete tugevus,
intellektuaalomandi loomine,
selged eeskirjad avatud ja
kaitstud tootmis- ja
litsentsimiskavade
eristamiseks, nende suutlikkus
töötada välja ja võtta vastu
tööstusdoktorantuure,
sidemed ühisettevõttega või
muud liiki fondid, et
hõlbustada uute idufirmade
arengut.
Valikumenetluses nõutakse
põhimõtte „ei kahjusta
oluliselt“ hindamist ja vajaduse
korral keskkonnamõju
strateegilist hindamist, kui
eeldatakse, et projektil on
territooriumile järjepidev mõju.
M4C2–18
Ülevõtmine1.5:
„Jätkusuutlikkus
t toetavate
innovatsiooni
Eesmärk
Hankelepingute
sõlmimine
innovatsiooni
ökosüsteeme
Lepingute
sõlmimisest
teatamine
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2022
Teade lepingute sõlmimise
kohta projektikonkursside
alusel välja valitud
projektidega kooskõlas
330
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
ökosüsteemide“
loomine ja
tugevdamine,
„teadus- ja
arendustegevus
e territoriaalsete
liidrite“ loomine
käsitlevate
projektide puhul;
põhimõtte „ei kahjusta
oluliselt“ tehniliste suunistega
(2021/C58/01), kasutades
välistamisnimekirja ning nõuet
järgida asjakohaseid ELi ja
riiklikke keskkonnaalaseid
õigusakte.
Valikumenetluses nõutakse
põhimõtte „ei kahjusta
oluliselt“ hindamist ja vajaduse
korral keskkonnamõju
strateegilist hindamist, kui
eeldatakse, et projektil on
territooriumile järjepidev mõju.
Riiklikud keskused luuakse
konkurentsipõhise
projektikonkursi alusel,
ühendades ülikoolides juba
olemasolevad maailma
juhtivad laborid ning avaliku ja
erasektori teaduskeskused,
samuti luues uue
sihtotstarbelise taristu.
M4C2–18 Bis Ülevõtmine 1.5:
„Jätkusuutlikkus Siht Innovatsiooni
ökosüsteemid, PUUDUVAD Number 0 10 2. kv 2026 Esitatakse tegevusaruanded
vähemalt kümne innovatsiooni
331
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
t toetavad
innovatsiooni
ökosüsteemid“,
millega luuakse
„teadus- ja
arendustegevus
e territoriaalsed
liidrid“
mille kohta on
koostatud
tegevusaruanne
ökosüsteemi kohta.
M4C2–19
Investeering
1.4:
Teadusstruktuur
ide
tugevdamine
ning riiklike
teadus- ja
arendustegevus
e liidrite loomise
toetamine
mõnede
peamiste
progressi
võimaldavate
tehnoloogiate
osas
Eesmärk
Lepingute
sõlmimine
peamiste
progressi
võimaldavate
tehnoloogiate
alaste riiklike
teadus- ja
arendustegevus
e liidritega
seotud
projektide puhul
Lepingute
sõlmimisest
teatamine
PUUDUVAD PUUDUVAD N 2. kv 2022
Teade lepingute sõlmimise
kohta projektikonkursside
alusel välja valitud
projektidega kooskõlas
põhimõtte „ei kahjusta
oluliselt“ tehniliste suunistega
(2021/C58/01), kasutades
välistamisnimekirja ning nõuet
järgida asjakohaseid ELi ja
riiklikke keskkonnaalaseid
õigusakte.
Projektid valitakse välja 30 %
ulatuses sekkumistena
„Teadus- ja
innovatsiooniprotsessid,
tehnosiire ja
ettevõtjatevaheline koostöö,
mis keskendub vähese CO2-
332
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
heitega majandusele,
vastupanuvõimele ja
kliimamuutustega
kohanemisele“ (IF022) ning
15 % ulatuses sekkumistena
„Teadus- ja
innovatsiooniprotsessid,
tehnosiire ja
ettevõtjatevaheline koostöö,
mis keskendub
ringmajandusele“ (IF023).
Projektide hindamisel
võetakse arvesse nende
teostatavust, jätkusuutlikkust,
muudest allikatest (nt
regionaalfondidest)
pärinemist, tootmissektori
kaasamist, partnerite kvaliteeti
ning mõju sotsiaalsele ja
keskkonnaalasele
jätkusuutlikkusele.
Projektikonkurss, mida
rahastatakse innovatsiooni
ökosüsteemidena.
Valikumenetluses nõutakse
põhimõtte „ei kahjusta
333
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
oluliselt“ hindamist ja
asjakohasel juhul
keskkonnamõju strateegilist
hindamist, kui projektil on
eeldatavasti territooriumile
järjepidev mõju.
M4C2–20
Investeering
3.2:
Omakapitalisüst
digipöörde fondi
(DTF)
Eesmärk
IT-valitsuse ja
rakenduspartner
i Cassa Depositi
e Prestiti (CDP)
vaheline leping,
millega luuakse
allkirjastatud
rahastamisvahe
nd
Lepingule
kirjutavad alla
Itaalia valitsus ja
Cassa Depositi e
Prestiti
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2022
Rahastamisvahendi
investeerimispoliitikasse/-
strateegiasse lisatakse
järgmised elemendid:
- Investeerimiseesmärgid
(fondi suurus, toimingute
arv, aja jooksul toetatavad
summad, mis on eristatud
toetusesaajate kaupa, nagu
VKEd ja keskmise
turukapitalisatsiooniga
ettevõtjad/suurettevõtjad)
- Kohaldamisala ja
abikõlblikud toetusesaajad
- Rahastamiskõlblikud
finantsvahendajad ja
valikuprotsess
- Antava toetuse liik (nt
334
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
tagatised, laenud,
omakapital ja
kvaasiomakapital)
- Suunatud risk/tulud igat liiki
investorite puhul
- Riskipoliitika ja
rahapesuvastane poliitika
- Juhtimine (partnerid,
fondivalitsejad, juhatus,
investeeringute komitee, roll
ja kohustused)
- Riskide hajutamine ja
kontsentratsiooni
piirmäärad
- Omakapitalipoliitika,
sealhulgas
omakapitaliinvesteeringute
väljumisstrateegia
- Põhimõtte „ei kahjusta
oluliselt“ järgimise ja
kestlikkuskontrolli poliitika ja
menetlusest kõrvalejätmise
335
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
kriteeriumide loetelu
- Laenupoliitika
võlainvesteeringuteks,
sealhulgas nõutavad
garantiid ja tagatised
- Rahaliste vahendite
kogumise ja rakendamise
ajakava
M4C2–21a Investeering 3.2
–
Digiüleminekufo
ndi tehtav
omakapitalisüst
Eesmärk Omakapitalisüst
digipöörde fondi
Üleviimistunnistus PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2024 Itaalia kannab DTFile üle
400 000 000 eurot.
Lisaks peab
investeerimispoliitika
(„Accordo Finanziario“) olema
kooskõlas meetme
kirjeldusega.
M4C2–21 Investeering 3.2
–
Digiüleminekufo
ndi tehtav
omakapitalisüst
Eesmärk Raporti
vastuvõtmine
Raporti
vastuvõtmine
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2026 Itaalia esitab aruande, milles
kirjeldatakse meetmeid, mida
DTF on võtnud
investeerimispoliitika
rakendamiseks, sealhulgas
meetmeid, mida on võetud
selliste finantstoodete
rakendamiseks, mida
omakapital peaks toetama,
336
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
ning meetmeid, mida
kavatsetakse võtta nende
toodete edasiseks
rakendamiseks.
Aruandes märgitakse ka
otsesel/kaudsel viisil ja igasse
finantstootesse investeeritud
summad.
M4C2–22
Investeering
2.1:
ÜLEEUROOPA
LIST HUVI
PAKKUV
TÄHTIS
PROJEKT
Siht Toetatud
projektide arv PUUDUVAD Number 0 20 2. kv 2025
Kontsessiooni andmise
dekreete annab välja
ettevõtlusministeerium ja
algatus „Made in Italy“, et
toetada vähemalt 20
üleeuroopalist huvi pakkuvat
tähtsat projekti.
337
L. LÄHETUS 5 KOMPONENT 1: Tööhõivepoliitika
Itaalia taaste- ja vastupidavuskava selle komponendi meetmetega viiakse ellu aktiivse tööturupoliitika
ja kutseõppe põhjalik ja integreeritud reform. Aktiivse tööturupoliitika tugevdamine ja avalike
tööturuasutuste suutlikkuse suurendamine, sealhulgas nende integreerimine haridus- ja
koolitusteenuse osutajate ning eraettevõtjatega, peaks suurendama teenuste tõhusust. Lisaks on selle
komponendi meetmete eesmärk vähendada sotsiaalset haavatavust šokkide suhtes, eelkõige võideldes
deklareerimata töö vastu kõigis selle vormides ja sektorites, kehtestades tõhusamad sanktsioonid koos
tugevamate stiimulitega seaduslikuks töötamiseks. Lisaks edendatakse selle komponendiga soolist
võrdõiguslikkust (võrdne palk) soolise võrdõiguslikkuse sertifitseerimise süsteemi kaudu. Samuti
investeeritakse noortesse, suurendades koolitusprogrammide hulka ja parandades nende kvaliteeti,
näiteks osaledes universaalse avaliku teenistuse programmis.
Nende meetmete rakendamine peaks aitama lahendada probleeme, mida on käsitletud 2020. aasta
riigipõhises soovituses nr 2 tööturu kohta, milles kutsuti Itaaliat üles vähendama kriisi mõju
tööhõivele, sealhulgas tööhõive aktiivse toetamise kaudu, 2020. aasta riigipõhises soovituses nr 2
oskuste, sealhulgas digioskuste toetamise kohta, 2019. aasta riigipõhises soovituses nr 2 suurendada
jõupingutusi deklareerimata töö vastu võitlemiseks ning tagada, et aktiivne tööturu- ja sotsiaalpoliitika
(...) jõuaks eelkõige noorte ja haavatavate rühmadeni. Toetada naiste osalemist tööturul“ ja 2019. aasta
riigipõhist soovitust nr 2 „edendada oskuste täiendamist, sealhulgas digioskuste tugevdamise kaudu“.
L.1. Tagastamatu rahalise toetusega seotud reformide ja investeeringute
kirjeldus
Reform 1 – Aktiivne tööturupoliitika ja kutseõpe
Reformi eesmärk on toetada aktiivset tööturusüsteemi, et pakkuda personaalseid kavasid, mis
hõlmavad tööhõivet, koolitust ja sotsiaalteenuseid. See meede seisneb töötajate garanteeritud tööalase
konkurentsivõime riikliku programmi loomises, toetades eelkõige kõige haavatavamaid rühmi
(naised, pikaajalised töötud, noored ja eakad töötajad ning puuetega inimesed), ning
täiskasvanuhariduse koolitusprogrammide läbiviimises.
Investeering 1 – Riiklike tööturuasutuste tugevdamine
Selle investeeringu eesmärk on võimaldada tööhõive- ja koolitusteenuste tõhusat osutamist. Meede
hõlmab riiklike tööturuasutuste tegevust, mis hõlmab näiteks järgmist: taristuinvesteeringud, kohalike
tööturgude piirkondlike vaatluskeskuste loomine, IT-süsteemi ajakohastamine, töötajate kutsealane
koolitus ning institutsiooniline teabevahetus ja teavitustegevus.
Reform 2 – deklareerimata töö vastu võitlemise riiklik kava
Meetme eesmärk on toetada töökohtade kvaliteeti ja töötingimusi, ennetades deklareerimata tööd,
tööalast ärakasutamist (nn Caporalato) ja muid ebaseadusliku töö vorme ning võideldes nende vastu.
See meede koosneb seadusandlikest ja muudest kui seadusandlikest meetmetest, sealhulgas:
tööinspektsioonide ja -sanktsioonide tugevdamine, stiimulite pakkumine korrapäraseks tööks,
tööhõivekeskuste käitajate koolitamine, riikliku teavituskampaania korraldamine, deklareerimata töö
vastase võitluse juhtimise parandamine ning konkreetsed meetmed tööalase ärakasutamise vastu
võitlemiseks põllumajanduses.
338
Investeering 2 – Soolise võrdõiguslikkuse sertifitseerimise süsteem
Meetme eesmärk on suurendada naiste osalemist tööturul ja aidata parandada naiste töötingimusi. See
investeering seisneb riikliku soolise võrdõiguslikkuse sertifitseerimise süsteemi loomises ja soolise
võrdõiguslikkuse sertifitseerimise pakkumises vähemalt 3 000 ettevõtjale. .
Investeering 3 – Kaheosalise süsteemi tugevdamine
Meetme eesmärk on toetada keskhariduseta noori ja täiskasvanuid töövõimalustele juurdepääsul. See
investeering seisneb formaal- ja kutsehariduses ning -koolituses osalevate õpilaste osalemise
laiendamises duaalses süsteemis, sealhulgas õpipoisiõppe kaudu.
Investeering 4 –Üldise avaliku teenistuse tugevdamine
Meetme eesmärk on suurendada mitteformaalses õppes osalevate noorte arvu ning parandada nende
teadmisi ja oskusi. See investeering seisneb universaalse avaliku teenistuse programmi parandamises
ja osalejate arvu suurendamises.
339
L.2. Tagastamatu rahalise toetuse eesmärgid, sihid, näitajad ning seire ja rakendamise ajakava
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
M5C1–1
Reform 1 –
aktiivsed
tööturumeetmed
ja kutseõpe
Eesmärk
Jõustub
ministeeriumideva
heline dekreet,
millega
kehtestatakse
töötajate
garanteeritud
tööalase
konkurentsivõime
riiklik programm, ja
ministeeriumideva
heline dekreet,
millega
kehtestatakse uute
oskuste riiklik kava
Ministeeriumidev
aheliste
dekreetide säte,
milles
osutatakse kahe
ministeeriumidev
ahelise dekreedi
jõustumisele
pärast riigi ja
piirkondade
vahelisel
konverentsil
saavutatud
kokkuleppeid
programmi
„GOL“ ja uute
oskuste riikliku
kava kohta
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2021
Soli nimel tehtavad toimingud
peavad vähemalt: i) määrata
kindlaks avalike tööturuasutuste
olulised elemendid ja standardid,
sealhulgas oskuste prognoosimine,
individuaalsed koolituskavad,
juhendamine ja tööalane
juhendamine, et tagada
individuaalsete tööturuasutuste
teenuste tulemuslik osutamine
vastavalt ühistele ja ühtsetele
standarditele kogu riigi
territooriumil, ii) tagada, et avalike
tööturuasutuste pakutav täiendus-
ja ümberõpe on täielikult kooskõlas
uute oskuste, sealhulgas
digioskuste riikliku kavaga, iii)
tagada, et avalikud tööturuasutused
on suunatud toetusesaajate
vajadustele, iv) tagada, et avalikud
tööturuasutused on esmajärjekorras
suunatud kõige haavatavamatele;
v) seada eesmärgiks, et vähemalt
25 % töötajate garanteeritud
tööalase konkurentsivõime
programmide toetusesaajatest
oleksid asjakohase koolituse
340
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
saajad, pöörates erilist tähelepanu
digioskustele ja seades esikohale
kõige haavatavamad; vi) luua uued
mehhanismid, mis tugevdavad ja
struktureerivad avaliku ja erasektori
süsteemide vahelist koostööd,
sealhulgas seoses asjakohaste
oskuste vajaduste kindlakstegemise
ja tööpakkumiste pakkumisega.
Dekreedis on sätestatud, et
sotsiaalsete turvavõrkude
kasutajatel on juurdepääs riikliku
tagatud tööalase konkurentsivõime
programmi raames osutatavatele
teenustele nelja kuu jooksul alates
hetkest, mil neil tekib õigus
sotsiaalsetele turvavõrkudele. Uute
oskuste riiklikku kava käsitlevad
õigusaktid peavad vähemalt: i)
määrab kindlaks ühised standardid
ja kutseõppe olulised tasemed kogu
riigi territooriumil, ii) on suunatud nii
töötajatele ja töötutele kui ka
isikutele, et parandada nende
digioskusi ja soodustada elukestvat
õpet. iii) teha kindlaks oskused ja
asjakohased standardid, tuginedes
avaliku ja erasektori süsteemide
vahelisele koostööle, iv) võtta
341
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
arvesse asjaomaste sihtrühmade
erinevaid vajadusi, mis hõlmavad
vähemalt kõige haavatavamaid, v)
hõlmata kõiki asjakohaseid
valdkondlikke strateegiaid, et
saavutada terviklik lähenemisviis,
sealhulgas täiskasvanuhariduse
riiklikku strateegilist kava. vi) lisada
säte tööturul lühikeses ja keskpikas
perspektiivis vajalike uute
pädevuste prognoosisüsteemi
väljatöötamiseks.
M5C1–2
Reform 1 –
aktiivsed
tööturumeetmed
ja kutseõpe
Eesmärk
Kõigi avalike
tööturuasutuste
kavade jõustumine
piirkondlikul
tasandil
Säte, milles
osutatakse
piirkondade
vastuvõetud
kavade
jõustumisele ja
elluviidud
tegevustele
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2022
Töötajate garanteeritud tööalase
konkurentsivõime (GOL) programmi
siseriiklikes õigusaktides nähakse
ette programmi rakendamiseks
vajalike operatiivtegevuste
kindlaksmääramine piirkondlikul
tasandil. Riikliku reguleerimise ja
piirkondliku rakendamise vahelise
sidususe tagamiseks võetakse
vastu riiklike tööturuasutuste
piirkondlikud kavad.
Lisaks kavade vastuvõtmisele
viivad piirkonnad ellu kavadel
põhinevaid tegevusi, jõudes
vähemalt 10 %ni programmi
kavandatud toetusesaajatest
342
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
(lõppeesmärk on 3 000 000
inimest).
Riiklike tööturuasutuste kavade
jõustumine võimaldab täielikult
rakendada töötajate garanteeritud
tööalase konkurentsivõime
programmi.
M5C1–3
Reform 1 –
aktiivsed
tööturumeetmed
ja kutseõpe
Siht
Inimesed, kes
saavad kasu
töötajate
garanteeritud
tööalase
konkurentsivõime
programmist
(GOL)
PUUDUVAD Number 0 3 000 000 4. kv 2025
Töötajate garanteeritud tööalase konkurentsivõime programmist (GOL) saab kasu vähemalt 3 000 000 inimest.
Lisaks peavad GOL-programmis määratletud olulised teenuste tasemed („Livelli essenziali delle prestazioni“) olema kättesaadavad vähemalt 80 % avalikest tööturuasutustest.
M5C1–4
Reform 1 –
aktiivsed
tööturumeetmed
ja kutseõpe
Siht
Koolitusprogrammi
des osalevad
inimesed
PUUDUVAD Number 0 600 000 4. kv 2025
Koolitusel osaleb vähemalt 600 000 GOL-programmi toetusesaajat, kellest vähemalt 300 000 osaleb digioskuste koolitusel.
Koolitusprogrammide „Progetto per l’autoimpiego“ ja „Fono nuove competenze“ valitud toetusesaajate nimekirjad avaldatakse.
343
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
M5C1–4a
Reform 1 –
aktiivsed
tööturumeetmed
ja kutseõpe
Siht Koolitusel
osalevad inimesed PUUDUVAD Number 600 000 800 000 2. kv 2026
Programmis GOL osaleb koolitusel
vähemalt 799 900 inimest.
Programmi GOL raames võib
koolitust pakkuda ka platvormi
Educazione Digitale per
l’Occupazione (EDO) kaudu.
Lisaks osaleb koolitustel vähemalt
100 inimest Fondo nuove
competenze või Progetto per
l’autoimpiego kaudu.
M5C1–6
Investeering 1 –
Riiklike
tööturuasutuste
tugevdamine
Siht
Riiklikud
tööturuasutused
rakendavad
tugevdamise
kavas kavandatud
meetmeid kolme
aasta jooksul
(2021–2023).
PUUDUVAD Number 0 250 4. kv 2022
Vähemalt 250 riiklikku
tööturuasutust on viinud kolme
aasta jooksul (2021–2023) lõpule
vähemalt 50 % tugevdamiskavas
kavandatud tegevustest.
Need tegevused on kooskõlas
keskse tugevdamise kavaga ja
need määratletakse täpsemalt
piirkondlikul tasandil, tuginedes
vajaduste analüüsile ja eraldatud
ressurssidele.
Need tegevused hõlmavad järgmist:
i) riiklike tööturuasutuste praeguste
asukohtade renoveerimine ja
remont ning uute asukohtade
ostmine; ii) IT-süsteemi edasine
344
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
rakendamine riikliku
koostalitlusvõime seisukohast; iii)
töötajate kutsealane koolitus; iv)
kohalike tööturgude piirkondlike
vaatluskeskuste institutsioon; v)
institutsiooniline teabevahetus ja
teavitustegevus.
See eesmärk ei hõlma taristuga
seotud tegevust.
Territoriaalse jaotuse (Põhja-, Kesk-
ja Lõuna-Euroopa) eesmärgi
saavutamisel tagatakse võrdne
tasakaal.
M5C1–7
Investeering 1 –
Riiklike
tööturuasutuste
tugevdamine
Siht
Riiklikud
tööturuasutused
on viinud lõpule
tugevdamise
kavas kavandatud
tegevused
PUUDUVAD Number 0 326 4. kv 2025
Vähemalt 326 riiklikku
tööturuasutust ja piirkondlikku
asutust on viinud lõpule
piirkondlikes kavades kavandatud
meetmed riiklike tööhõivekeskuste
tugevdamiseks (Piani regionali di
potenziamento dei centri per
l’impiego), sealhulgas näiteks: IT-
süsteemide ajakohastamine,
töötajate koolitamine, kohalike
tööturgude piirkondlike
vaatluskeskuste loomine ja
teavituskampaaniad.
345
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
M5C1–7a
Investeering 1 –
Riiklike
tööturuasutuste
tugevdamine
Siht
Riiklike
tööturuasutuste
taristuga seotud
tegevus
PUUDUVAD Number 0 270 2. kv 2026
Vähemalt 270 riiklike
tööturuasutuste ja piirkondlike
asutuste ruumi on renoveeritud
ja/või renoveeritud või omandatud,
nagu on ette nähtud piirkondlikes
kavades riiklike tööhõivekeskuste
tugevdamiseks (Piani regionali di
potenziamento dei centri per
l’impiego).
346
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
M5C1–8
Reform 2 –
Deklareerimata
töö
Eesmärk
Deklareerimata
töö vastu
võitlemise riikliku
kava ja selle
rakendamise
tegevuskava
jõustumine kõigis
majandussektorite
s
Seaduse sätted,
milles
osutatakse
riikliku kava
jõustumisele ja
institutsioonidev
ahelise
töörühma
loomisele, kes
vastutab riikliku
kava ja
rakendamise
tegevuskava
koostamise eest
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2022
Riikliku kava ja tähtajalise
(üheaastase) rakenduskava
vastuvõtmine, et võidelda
deklareerimata töö vastu kõigis
majandussektorites. Riiklik kava
tugineb deklareerimata töö vastu
võitlemise üldstrateegiale ja mitut
asutust hõlmavale lähenemisviisile,
mida kasutati
põllumajandussektoris tööjõu
kasutamise vastase riikliku kava
„Piano triennale di contrasto allo
sfruttamento lavorativo in
agricoltura e al caporalato (2020–
2022)“ vastuvõtmiseks. Riiklik kava
ja rakendamise tegevuskava
sisaldavad vähemalt järgmist: i) meetmed deklareerimata tööd
käsitlevate üksikasjalike andmete
koostamise, kogumise ja õigeaegse
levitamise parandamiseks; ii) otseste ja kaudsete meetmete
kehtestamine deklareerimata töö
muutmiseks deklareeritud tööks,
tagades, et deklareeritud
majanduses tegutsemisest saadav
kasu kaalub üles deklareerimata
majanduses töötamise kulud.
Näiteks a) hoiatavad meetmed,
347
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
nagu kontrolli ja sanktsioonide
tugevdamine, ning ennetavad
meetmed deklareeritud töö
edendamiseks, nagu sihipärased
rahalised stiimulid, muu hulgas
olemasolevate stiimulite
läbivaatamise ja ratsionaliseerimise
kaudu; b) tugevdada seost
tööhõive- ja sotsiaalpoliitikaga; iii) riiklik teavituskampaania
deklareerimata töö väärtuse
vähenemise kohta, mis on
suunatud tööandjatele ja töötajatele
ning milles osalevad aktiivselt
sotsiaalpartnerid; iv) juhtimisstruktuur meetmete
tõhusa rakendamise tagamiseks;
v) meetmed ebaseaduslike
asunduste ületamiseks, et võidelda
tööalase ärakasutamise vastu
põllumajanduses.
M5C1–9
Reform 2 –
Deklareerimata
töö
Eesmärk
Võtta meetmeid
deklareerimata töö
vastu võitlemiseks
Elluviidud
tegevused PUUDUVAD PUUDUVAD PUUDUVAD 1. kv 2024
Rakendatakse järgmisi meetmeid:
i) Võtta meetmeid deklareerimata
tööd käsitlevate üksikasjalike
andmete kogumise parandamiseks;
ii) Võtta meetmeid deklareerimata
348
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
töö muutmiseks deklareeritud
tööks:
a) heidutav(ad) meede (meetmed),
mis võivad muu hulgas hõlmata
kontrollide ja sanktsioonide
tugevdamist, ning ennetusmeede (-
meetmed) deklareeritud töö
edendamiseks, mis võivad muu
hulgas hõlmata sihipäraseid rahalisi
stiimuleid;
b) meede (meetmed), millega
tugevdatakse seost aktiivse
tööturupoliitikaga, mis võib muu
hulgas hõlmata tööhõivekeskuste
töötajate koolitamist;
iii) Korraldada riiklik
teavituskampaania deklareerimata
töö väärtuse vähenemise kohta;
iv) Deklareerimata töö vastu
võitlemise juhtimisstruktuuri töö
alustamine;
v) Võtta meetmeid tööjõu
ekspluateerimise vastu võitlemiseks
põllumajanduses.
M5C1–10 Reform 2 – Siht Tööinspektsioonid PUUDUVAD Number 0 102 895 4. kv 2025 Riikliku tööinspektsiooni ja
349
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
deklareerimata
töö vastu
võitlemise riiklik
kava
e arvu
suurenemine ja
võrgustiku „rete
del lavoro agricolo
di qualità“
liikmesus
Carabinieri IT-süsteemides
ajavahemikul 1. jaanuarist 2023
kuni 31. detsembrini 2025
registreeritud iga-aastaste
kontrollide keskmine arv peab
olema vähemalt 102 895. Lisaks
lisatakse INPSi veebisaidil
avaldatud võrgustiku „rete del
lavoro agricolo di qualità“ liikmete
nimekirja veel 2 000 ettevõtet
võrreldes 2024. aasta juuniga.
M5C1–11
Reform 2 –
Deklareerimata
töö
Eesmärk
Võtta meetmeid
deklareerimata töö
vastu võitlemiseks
Elluviidud
tegevused PUUDUVAD PUUDUVAD PUUDUVAD 1. kv 2026
Rakendatakse järgmisi meetmeid:
– uuring „Indici Sintetici di
Affidabilità Contributiva“ (ISACi
näitajad) kohta kuues
majandussektoris;
saata vähemalt 12 000
vastavuskirja ISACi näitajate alusel
kindlaks tehtud äriühingutele;
– avaldati uuring, milles hinnati
„PrestO“ ja „Libretto Famiglia“
vautšerite mõju deklareerimata
tööle.
M5C1–12 Investeering 2 –
Soolise Eesmärk Soolise
võrdõiguslikkuse
Sertifitseerimissü
steemi PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2022 Soolise võrdõiguslikkuse
sertifitseerimise süsteem ja sellega
350
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
võrdõiguslikkuse
sertifitseerimise
süsteem
sertifitseerimise
süsteemi ja
sellega seotud
stimuleerimismehh
anismide
jõustumine
ettevõtjate jaoks
määratlemist
reguleerivate
õigusaktide ja
rakendusmeetm
ete jõustumist
käsitlevad
seadusesätted
kaasnevad äriühingutele suunatud
stimuleerimismehhanismid
hõlmavad vähemalt järgmisi
mõõtmeid: naiste kasvuvõimalused,
võrdne tasu võrdse töö eest,
soolise mitmekesisusega seotud
juhtimispoliitika, emaduse kaitse.
Sertifitseerimisprotsessi läbiviivate
organisatsioonide
stimuleerimismehhanismide ja
tehniliste suuniste määratlus.
Sealhulgas: i) äriühingute soolise
sertifitseerimise süsteemi tehniliste
standardite väljatöötamine; ii)
stiimulite mehhanismi
kindlaksmääramine; iii) meetmega
kaasneb IT-süsteemi loomine.
M5C1–14
Investeering 2 –
Soolise
võrdõiguslikkuse
sertifitseerimise
süsteem
Siht
Ettevõtjad on
saanud soolise
võrdõiguslikkuse
sertifikaadi
PUUDUVAD Number 0 3 000 2. kv 2026
Soolise võrdõiguslikkuse tõendi on
saanud vähemalt 3 000 ettevõtjat.
Neist vähemalt 1 800 on VKEd,
kellest 500 on saanud tehnilist abi
ja/või sertifitseerimisteenuseid.
M5C1–15
Investeering 3 –
duaalse süsteemi
tugevdamine
Siht
Duaalse
haridussüsteemi
kaudu välja antud
tunnistused
PUUDUVAD Number 0 90 000 2. kv 2025
Aastateks 2020–2021, 2021–2022,
2022–2023, 2023–2024 või 2024–
2025 antakse välja vähemalt
90 000 osalemistunnistust
õpilastele, kes kombineerivad
351
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
formaalharidust ja õpikogemust
töökohal.
M5C1–15a
Investeering 4 –
Universaalne
avalik teenistus
Eesmärk
Võtta meetmeid
noorte osaluse
suurendamiseks,
menetluste
lihtsustamiseks ja
üldise avaliku
teenistuse
projektide
kvaliteedi
parandamiseks
Elluviidud
tegevused PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2024
Rakendatakse järgmisi meetmeid:
1. Võtta meetmeid noorte osaluse suurendamiseks universaalses avaliku teenistuse programmis;
2. Võtta meetmeid menetluste lihtsustamiseks, et vähendada üldist avalikku teenistust käsitleva programmi rakendamisega seotud halduskoormust;
3. Võtta meetmeid üldise avaliku teenistuse projektide kvaliteedi parandamiseks.
Võetavate meetmete puhul võetakse arvesse tehnilise toe instrumendi projekti (20IT06 – „Üldise avaliku teenistuse taaste- ja vastupidavuskava projekti kavandamise ja rakendamise toetamine, et luua noortele tööhõivevõimalusi“) tulemusi.
M5C1–16
Investeering 4 –
Universaalne
avalik teenistus
Siht
Universaalse
avaliku teenistuse
projektidele
väljastatud tõendid
PUUDUVAD Number 0 166 670 2. kv 2026
Nelja aasta jooksul (31. detsembrist
2020 kuni 31. detsembrini 2024)
käivitatud projektidele on välja
antud vähemalt 166 670 tunnistust
universaalses avalikus teenistuses
352
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
osalemise kohta
353
L.3. Laenuga seotud reformide ja investeeringute kirjeldus
Investeering 5 – Naistele kuuluvate ettevõtete loomine
See meede hõlmab avaliku sektori investeeringut rahastusse, et stimuleerida erainvesteeringuid ja parandada
juurdepääsu rahastamisele Itaalias naisettevõtete loomiseks ja kasvuks projektide rahastamise, mentorluse,
kommunikatsioonitegevuse ja ettevõtlushariduse teenuste kaudu. Rahastu toimib toetuste ja laenude andmise
kaudu otse erasektorile.
Rahastut haldab rakenduspartnerina Invitalia. Rahastu hõlmab järgmisi tooteliike:
• Fondo a sostegno dell’impresa femminile, mis toetab naiste juhitud ettevõtlusalgatusi toetuste ja
intressivabade laenude kaudu; sellest rahastatakse ka naisüliõpilastele ja -noortele suunatud teavitus-
ja koolitusalgatusi ning haridusteenuseid, mille eesmärk on levitada naiste ettevõtluskultuuri;
• Nuove imprese a tasso null (NITO-ON), mis on pühendatud peamiselt või täielikult noorte või naiste
juhitavate mikro- ja väikeettevõtete loomisele ja kasvule, mida rahastatakse toetuste ja
intressivabade laenude kaudu;
• Smart & Start Italia, mille eesmärk on edendada uuenduslikke tehnoloogiapõhiseid idufirmasid,
eelkõige tugevate digi- või teaduspõhiste elementidega idufirmasid, mida rahastatakse laenudest;
Kesk- ja Lõuna-Itaalias asuvate idufirmade puhul võib teatava osa laenust konverteerida
tagastamatuks toetuseks.
Rahastusse investeerimiseks allkirjastavad Itaalia ja Invitalia rakenduskokkuleppe, mis sisaldab järgmist:
1. Rahastu otsustusprotsessi kirjeldus: Rahastu lõplikud investeerimisotsused teeb investeeringute
komitee või muu vastav samaväärne juhtorgan ning need kiidetakse heaks valitsusest sõltumatute
liikmete häälteenamusega.
2. Seotud investeerimispoliitika põhinõuded, mis hõlmavad järgmist:
a) Finantstoodete ja rahastamiskõlblike lõplike abisaajate kirjeldus.
b) Nõue, et kõik toetatavad investeeringud peavad olema majanduslikult elujõulised;
c) Nõue järgida põhimõtet „ei kahjusta oluliselt“, nagu on sätestatud põhimõtte „ei kahjusta
oluliselt“ tehnilistes suunistes (2021/C58/01). Eelkõige jäetakse investeerimispoliitikaga
rahastamiskõlblikkuse alt välja järgmised tegevused ja varad: i) fossiilkütustega seotud tegevus
ja varad, sealhulgas allkasutus, ii) ELi heitkogustega kauplemise süsteemi84 (HKS) alla
kuuluvad tegevused ja varad, millega saavutatakse prognoositud kasvuhoonegaaside heide, mis
ei ole asjaomastest võrdlusalustest väiksem,85 iii) prügilate, jäätmepõletustehaste ja mehaanilis-
bioloogilise töötlemise jaamadega seotud tegevus86 ja varad87.
84 Välja arvatud a) varad ja tegevused maagaasi kasutavas elektri- ja/või soojusenergia tootmises ning sellega seotud
ülekande- ja jaotustaristus, mis vastavad põhimõtte „ei kahjusta oluliselt“ tehniliste suuniste (2021/C58/01) III lisas
sätestatud tingimustele, ning b) alapunktis ii osutatud tegevused ja varad, mille puhul fossiilkütuste kasutamine on
fossiilkütustevabale käitamisele õigeaegseks üleminekuks ajutine ja tehniliselt vältimatu. 85 Kui toetatava tegevusega saavutatakse prognoositud kasvuhoonegaaside heide, mis ei ole asjaomastest võrdlusalustest
oluliselt väiksem, esitatakse selgitus selle kohta, miks see ei ole võimalik. Saastekvootide tasuta eraldamise
võrdlusalused saastekvootidega kauplemise süsteemi kohaldamisalasse kuuluvate tegevuste jaoks on sätestatud
komisjoni rakendusmääruses (EL) 2021/447. 86 Välistamist ei kohaldata meetme tegevuste suhtes, mis toimuvad üksnes ringlussevõetamatute ohtlike jäätmete
töötlemisega tegelevates jaamades, ega olemasolevate jaamade suhtes, kui meetme tegevuste eesmärk on suurendada
energiatõhusust, koguda heitgaase ladustamiseks või kasutamiseks või taaskasutada põletustuhas leiduvaid materjale,
tingimusel et need tegevused ei suurenda jaamade jäätmetöötlusvõimsust ega pikenda nende kasutusiga; tõendid selle
kohta tuleb esitada iga jaama kohta eraldi.
354
d) Nõue, et rahastu lõplikud toetusesaajad ei saa samade kulude katmiseks toetust muudest liidu
vahenditest.
3. Rakenduslepinguga hõlmatud summa, rakenduspartneri tasude struktuur ja nõue reinvesteerida mis
tahes tagasisaadavad vahendid vastavalt rahastu investeerimispoliitikale.
4. Seire-, auditi- ja kontrollinõuded, sealhulgas:
1. Rakenduspartneri järelevalvesüsteemi kirjeldus, et anda aru kaasatud investeeringute kohta.
2. Rakenduspartneri selliste menetluste kirjeldus, millega tagatakse pettuste, korruptsiooni ja
huvide konfliktide ennetamine, avastamine ja kõrvaldamine.
3. Kohustus kontrollida iga tehingu puhul enne rahastamiskohustuse võtmist tehingu
rahastamiskõlblikkust kooskõlas rakenduslepingus sätestatud nõuetega;
4. Kohustus teha riskipõhiseid järelauditeid kooskõlas Invitalia auditikavaga. Auditite käigus
veendutakse, et i) kontrollisüsteemid on tõhusad, muu hulgas pettuste, korruptsiooni ja huvide
konfliktide avastamisel, ii) põhimõtte „ei kahjusta oluliselt“ järgimine ja riigiabi eeskirjad; ning
iii) järgitakse nõuet, et rahastu lõplikud toetusesaajad ei tohi olla saanud samade kulude
katmiseks toetust muudest liidu vahenditest. Auditite käigus kontrollitakse ka tehingute
seaduslikkust ja kohaldatava rakenduskokkuleppe tingimuste täitmist.
87 Välistamist ei kohaldata meetme tegevuste suhtes, mis toimuvad olemasolevates mehhaanilis-bioloogilise töötlemise
jaamades, kus nende tegevuste eesmärk on suurendada energiatõhusust või moderniseerida eraldatud jäätmete
ringlussevõttu biojäätmete kompostimiseks ja biojäätmete anaeroobseks lagundamiseks, tingimusel et need tegevused ei
suurenda jaamade jäätmetöötlusvõimsust ega pikenda nende kasutusiga; tõendid selle kohta tuleb esitada iga jaama
kohta eraldi.
355
L.4. Laenu eesmärgid, sihid, näitajad ning seire ja rakendamise ajakava
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtests
enaarium Eesmärk Nõuded Aasta
M5C1–17
Investeering 5 –
Naistele
kuuluvate
ettevõtete
loomine
Eesmärk
Võetakse vastu
naiste ettevõtluse
toetamise fond
Ministri dekreet
„Fondo Impresa
Donna“ asutamise
kohta on heaks
kiidetud
PUUDUVA
D
PUUDUV
AD PUUDUVAD 3. kv 2021
Naiste ettevõtluse toetamise fond
võetakse vastu ministri käskkirjaga,
millega kehtestatakse
rahastamiskõlblikkuse kriteeriumid
kooskõlas taaste- ja
vastupidavusrahastu eesmärkidega,
sealhulgas põhimõttega „ei kahjusta
oluliselt“, ning allkirjastatakse
rahastamisleping ja tegevuslepingud
finantsvahendaja(te)ga.
Need fondid moodustavad Fondo Impresa Donna, mis rakendab naisettevõtluse toetamiseks mõeldud erimeedet. Rakendusmeetmetes lepivad eelnevalt kokku majandusarengu ministeerium ja PCM võrdsete võimaluste osakond ning nende eesmärk on:
– tugevdada olemasolevaid meetmeid, mida juba haldavad majandusarengu ministeeriumi asutusesisesed organid (nt NITO-ON, Smart & Start), kapitalisüstiga, mis on ette nähtud üksnes naisettevõtjatele; – 2021. aasta eelarveseadusega
loodud naisettevõtlusfondi täiendav
rahastamine (alates 2022. aasta
356
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtests
enaarium Eesmärk Nõuded Aasta
kolmandast kvartalist);
– kaasnevate meetmete, järelevalve-
ja teavituskampaaniate kavandamine.
PCM võrdsete võimaluste osakond
viib läbi mitmeaastase
teavituskampaania, et edendada
naisettevõtlust, pakkuda igas vanuses
naistele ja ülikoolide naisüliõpilastele
kutsenõustamist valdkondades ja
kutsealadel, kus naised on
alaesindatud, ning luua
teabevahetusplatvorm.
M5C1–18
Investeering 5 –
Naistele
kuuluvate
ettevõtete
loomine
Siht Ettevõtetele on
antud finantstoetust PUUDUVAD Number 0 700 2. kv 2023
Võrreldes lähteväärtusega on rahalist
toetust antud vähemalt veel 700
ettevõttele.
Naisettevõtlust toetatakse juba
toimivate vahendite (NITO-ON, Smart
& Start) ja 2021. aasta
eelarveseadusega loodud uue fondi
kaudu (naisettevõtted, mida
toetatakse kuni 2020. aasta
novembrini lähtealusena
olemasolevatest
rahastamisvahenditest).
M5C1–19a Investeering 5 –
Naistele
kuuluvate
Eesmärk Rakenduskokkulepe. Rakenduskokkulep
pe jõustumine
PUUDUVA
D
PUUDUV
AD PUUDUVAD 4. kv 2025 Rakenduskokkuleppe jõustumine.
357
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtests
enaarium Eesmärk Nõuded Aasta
ettevõtete
loomine
M5C1–20
Investeering 5 –
Naistele
kuuluvate
ettevõtete
loomine
Siht
Üleviimine
Invitaliasse ja lõplike
abisaajatega
sõlmitud õiguslikud
kokkulepped
PUUDUVAD Protsendim
äär (%) 0 100 2. kv 2026
Itaalia kannab rahastu jaoks
Invitaliasse üle 399 099 241,07 eurot.
Invitalia peab olema sõlminud lõplike
toetusesaajatega seaduslikud
rahastamislepingud summas, mis on
vajalik, et kasutada 100 % taaste- ja
vastupidavusrahastu
investeeringutest rahastusse (võttes
arvesse kommunikatsiooni- ja
haridusteenuste haldamist ja tasusid).
Itaalia muudab rakenduslepingut,
märkides rahastamispaketi
kogusummaks 399 099 241,07 eurot.
358
M. MISSIOON 5 KOMPONENT 2: Sotsiaalne taristu, perekonnad,
kogukonnad ja kolmas sektor
Selles komponendis sisalduvate kavandatud reformide ja investeeringute eesmärk on tugevdada
vastupanuvõimet, toetades kõige haavatavamate inimeste integreerimist ja kaasamist individuaalses,
perekondlikus ja sotsiaalses mõõtmes. Selle komponendiga nähakse ette haavatavate
elanikkonnarühmade aktiivse kaasamise riiklik strateegia. Selle komponendi eesmärgid on järgmised:
i) tugevdada integreeritud sotsiaalteenuste rolli, et toetada perekondi, alaealisi ja noorukeid, toetada
lapsevanemaks olemise oskusi ning kaitsta haavatavaid perekondi ja puuetega inimesi, sealhulgas
kolmanda sektoriga seotud sotsiaalse taristu tõhustamise kaudu; ii) parandada puuetega inimeste
autonoomiat, pakkudes kogukonna- ja kodupõhiseid sotsiaal- ja tervishoiuteenuseid ning kõrvaldades
eluasemele ja töövõimalustele juurdepääsu takistused; iii) parandada äärmuslikus marginaliseerumises
ja halbades tingimustes elavate inimeste (nt kodutud) kaasamist, pakkudes rohkem ajutise majutuse
abivahendeid ja -teenuseid ning individuaalseid võimalusi autonoomia ja isikliku vastupanuvõime
saavutamiseks; iv) taskukohasemate avaliku ja erasektori eluasemete kättesaadavuse parandamine
ning linnade ja piirkondade taaselustamine; v) kõige haavatavamate inimeste vastupanuvõime
suurendamine spordikultuuri levitamise ja sporditaristu loomise kaudu, luues linnaparke, kus sporti
saab kogukondade hüvanguks kombineerida meelelahutustegevusega.
Nende meetmete rakendamine peaks aitama lahendada probleeme, mida käsitletakse 2019. aasta
riigipõhistes soovitustes nr 2 sotsiaalpoliitika kohta, milles kutsutakse Itaaliat üles „tagama, et
sotsiaalpoliitika oleks tõhusalt integreeritud ning jõuaks eelkõige noorte ja haavatavate rühmadeni“,
ning 2020. aasta riigipõhistes soovitustes nr 2 „tagada piisav juurdepääs sotsiaalkaitsele“.
M.1. Tagastamatu rahalise toetusega seotud reformide ja investeeringute kirjeldus
Reform 1 – puuetega inimesi käsitlev raamseadus
Reformi peamine eesmärk on muuta puuetega inimesi käsitlevaid õigusakte ning edendada puuetega
inimeste deinstitutsionaliseerimist (st üleviimist avaliku või erasektori asutustest nende
perekondadesse või kogukondlikesse kodudesse) ja autonoomiat. See hõlmab i) sotsiaalteenuste
pakkumise suurendamist, ii) sotsiaal- ja tervishoiuteenustele juurdepääsu lihtsustamist, iii) puuete
hindamise reforme, iv) iseseisva elu projektide edendamist, v) selliste eksperdirühmade töö
edendamist, kes võivad toetada mitmemõõtmeliste vajadustega puuetega inimesi.
Reform 2 – reform seoses eakate inimestega, kes ei suuda end ise ülal pidada
Selle meetme eesmärk on reformida sotsiaalteenuseid ja parandada nende eakate elutingimusi, kes ei
suuda end ise ülal pidada. Reform hõlmab järgmist: i) lihtsustada eakate juurdepääsu teenustele, luues
ühtsed juurdepääsupunktid sotsiaal- ja tervishoiuteenustele, ii) teha kindlaks viisid, kuidas tunnistada
abivajadusel põhinevat iseseisvuse puudumist, iii) anda mitmemõõtmeline hinnang, iv) määratleda
individuaalsed projektid, mis edendavad deinstitutsionaliseerimist. See reform on kavandatud kavas
ette nähtud konkreetsete sekkumistega, mis sisalduvad nii tervishoiumissioonis (M6) seoses
projektidega, millega tugevdatakse kohalikke tervishoiuteenuseid ja koduhooldust, kui ka selles
komponendis, eelkõige seoses 1. investeeringuga, II sekkumisega, mille eesmärk on
deinstitutsionaliseerimine.
Investeering 1 – Haavatavate inimeste toetamine ja institutsionaliseerimise ennetamine
Selle meetme eesmärk on toetada haavatavaid inimesi ja vältida institutsionaliseerimist. Meede
hõlmab meetmeid, mis on suunatud haavatavatele peredele ja lastele, eakatele ja sotsiaaltöötajatele
vähemalt 85 % Itaalia sotsiaalpiirkondadest.
359
Investeering 2 – Puuetega inimeste iseseisvuse mustrid
Selle meetme eesmärk on suurendada puuetega inimeste iseseisvust, kiirendades
deinstitutsionaliseerimise protsessi. Meede seisneb juurdepääsu pakkumises eluasemele või kodustele
lahendustele, samuti digitehnoloogiale ja koolitustele.
Investeering 3 – Esmalt eluase ja postijaamad
Selle meetme eesmärk on kaitsta ja toetada tõrjutud inimeste kaasamist. Meede koosneb kahte liiki
kokkulepetest: lahendused „Esmalt eluase“, mis hõlmavad omavalitsusi, kes pakuvad üksikisikutele,
väikestele rühmadele või peredele kohandatud projekte ja majutust kuni 24 kuuks; ning postjaamade
lahendused, mis koosnevad kodututele mõeldud teenindus- ja kaasamiskeskustest, mis pakuvad
selliseid olulisi teenuseid nagu esmatarbekaubad ja posti jaotamine, toitlustamine ja tervishoid.
360
M.2. Tagastamatu rahalise toetuse eesmärgid, sihid, näitajad ning seire ja rakendamise ajakava
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
M5C2–1
Reform 1 –
puuetega inimesi
käsitlev
raamseadus
Eesmärk
Puuetega inimeste
autonoomia
tugevdamise
raamseaduse
jõustumine
Seaduse säte,
mis viitab
raamseaduse
jõustumisele
PUUDUVA
D
PUUDUV
AD
PUUDUV
AD 4. kv 2021
Raamseadusega, mis koosneb
delegeerimisseadusest,
tugevdatakse puuetega inimeste
autonoomiat kooskõlas ÜRO
puuetega inimeste õiguste
konventsiooni ja puuetega inimeste
õiguste Euroopa strateegia (2021–
2030) põhimõtetega, mis hõlmavad
vähemalt järgmist: i) puuetega
inimestele pakutavate
sotsiaalteenuste põhjalik
määratlemine ja tõhustamine koos
deinstitutsionaliseerimise ja iseseisva
elu edendamisega, ii) tervishoiu- ja
sotsiaalteenustele juurdepääsu korra
lihtsustamine ning iii) puude seisundi
hindamise korra läbivaatamine, et
hinnata iga inimese seisundit
mitmemõõtmeliselt.
Puuetega inimesed on määratletud
ÜRO puuetega inimeste õiguste
konventsiooni põhimõtete kohaselt
seaduses nr 104/1992. Itaalias
kuulub hindamisprotsess piirkondade
pädevusse ja isikut hindab kohalik
tervishoiuteenistus või riiklik
361
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
sotsiaalhoolekande instituut.
Seaduse ettepaneku esitab puuetega
inimeste minister ministrite
nõukogule heakskiitmiseks vastavalt
kehtestatud tegevuskavale.
Raamseaduse vastuvõtmisele
järgneb kohalike sotsiaalteenuste
ümberkorraldamine,
kvaliteedistandardite määratlemine
ning IKT-platvormi pakkumine
teenuste tõhustamiseks ja
tõhustamiseks.
M5C2–2
Reform 1 –
puuetega inimesi
käsitlev
raamseadus
Eesmärk
Jõustuvad
seadusandlikud
dekreedid, millega
arendatakse edasi
raamseaduse
sätteid, et tugevdada
puuetega inimeste
autonoomiat
Seaduse
sätted, mis
viitavad
seadusandlike
dekreetide
jõustumisele
PUUDUVA
D
PUUDUV
AD
PUUDUV
AD 2. kv 2024
Seadusandlike dekreetidega
töötatakse välja raamseaduse sätted,
et tugevdada puuetega inimeste
autonoomiat: i) sotsiaalteenuste
pakkumise suurendamine, ii)
sotsiaal- ja tervishoiuteenustele
juurdepääsu lihtsustamine, iii) puuete
hindamise reformid, iv) iseseisva elu
projektide edendamine, v) selliste
eksperdirühmade töö edendamine,
kes võivad toetada
mitmemõõtmeliste vajadustega
puuetega inimesi.
362
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
M5C2–3
Reform 2 – reform
seoses eakate
inimestega, kes ei
suuda end ise ülal
pidada
Eesmärk
Sellise raamseaduse
jõustumine, millega
tugevdatakse
meetmeid, mille
eesmärk on toetada
vanemaid inimesi,
kes ei suuda end ise
ülal pidada
Seaduse
sätted, mis
viitavad
raamseaduse
jõustumisele,
millega
tugevdatakse
meetmeid
eakate inimeste
toetamiseks,
kes ei suuda
end ise ülal
pidada
PUUDUVA
D
PUUDUV
AD
PUUDUV
AD 1. kv 2023
Valitsuse esildatud raamseadusega
tugevdatakse meetmeid, mille
eesmärk on toetada eakaid, kes ei
suuda end ise ülal pidada.
Seadusega lihtsustatakse sotsiaal- ja
tervishoiuteenuste ühtseid
kontaktpunkte ja tagatakse nende
olemasolu, vaadatakse läbi
majanduslikult mittevarustava
vanemaealise isiku seisundi
hindamise menetlused ning
suurendatakse sotsiaal- ja
tervishoiuteenuste hulka, mida võib
osutada kodus. Seaduses
määratakse kindlaks ka vajalikud
rahalised vahendid.
M5C2–4
Reform 2 –
reform, mis
käsitleb
mittesõltumatuid
eakaid inimesi
Eesmärk
Jõustub
seadusandlik
dekreet, millega
arendatakse edasi
raamseaduse
sätteid, et tugevdada
meetmeid eakate
inimeste
toetamiseks, kes ei
suuda end ise ülal
pidada
Seaduse
sätted, mis
viitavad
seadusandliku
dekreedi
jõustumisele
PUUDUVA
D
PUUDUV
AD
PUUDUV
AD 1. kv 2024
Seadusandliku dekreediga
täpsustatakse raamseaduse sätteid,
et tugevdada meetmeid, mille
eesmärk on toetada eakaid, kes ei
suuda end ise ülal pidada,
rakendades erinevaid meetmeid.
363
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
M5C2–5
Investeering 1 –
Haavatavate
inimeste
toetamine ja
institutsionaliseeri
mise ennetamine
Eesmärk Tegevusplaani
jõustumine
Seaduse
sätted, mis
viitavad
sekkumiste
tegevuskava
jõustumisele
PUUDUVA
D
PUUDUV
AD
PUUDUV
AD 4. kv 2021
Operatsiooniplaanis määratakse
kindlaks nõuded projektidele, mida
võivad esitada kohalikud üksused ja
mis on seotud nelja mõõtmega: i) 0–
17-aastaste laste vanemate
toetamine, ii) eakate iseseisvuse
toetamine, iii) eakate koduteenused
ja iv) sotsiaaltöötajate toetamine.
Meede „Lapsevanemate toetamine“
hõlmab vähemalt toetust saavate
perede toetamist vähemalt 18 kuu
jooksul i) perekeskkonna ja laste
olukorra eelhindamisega, ii) olukorra
hindamisega, mille käigus
moodustati valdkondadevaheline
kvalifitseeritud spetsialistidest
koosnev meeskond, ning iii)
vähemalt ühe järgmise teenuse
osutamisega: koduteenused,
osalemine lapsevanemate ja laste
tugirühmades; koolide, perede ja
sotsiaalteenuste ja/või ühiste
perehooldusteenuste vaheline
koostöö.
Eakate iseseisvuse meede hõlmab
vähemalt eakate hooldekodude
ümberkujundamist autonoomsete
korterite rühmadeks, mis on
364
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
varustatud kõigi vajalike rajatiste ja
teenustega, sealhulgas
koduautomaatika, telemeditsiin ja
kaugseire.
Eakatele mõeldud koduteenuste
meetme eesmärk on pakkuda
spetsialistidele erikoolitust eakatele
mõeldud koduteenuste kohta.
Meede „sotsiaaltöötajate toetamine“
seisneb sotsiaalettevõtjate
toetamises ning nende
professionaalsuse ja pädevuste
jagamise tugevdamises, peamiselt
võttes kasutusele vahendid
pädevuste jagamiseks ja pakkudes
ettevõtjatele järelevalveteenuseid, et
toetada ettevõtjate tööd.
M5C2–7
Investeering 2 –
Puuetega
inimeste
iseseisvuse
mustrid
Siht
Sotsiaalpiirkonnad
on ellu viinud
vähemalt ühe
projekti, mis on
seotud kodude
renoveerimise ja/või
puuetega inimestele
IKT-seadmete
pakkumisega,
millega kaasneb
PUUDUVAD Number 0 500 4. kv 2022
Sotsiaalpiirkonnad viivad ellu
vähemalt 500 projekti, mis on seotud
kodude renoveerimise ja/või
puuetega inimestele IKT-seadmete
pakkumisega ning millega kaasneb
digioskuste alane koolitus.
Eesmärgi rahuldav täitmine sõltub ka
teisese eesmärgi rahuldavast
täitmisest: vähemalt 500
365
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
digioskuste alane
koolitus
sotsiaalpiirkonnas on ellu viidud
vähemalt üks projekt, mis on seotud
kodude renoveerimise ja/või IKT-
seadmete pakkumisega puuetega
inimestele, millega kaasneb
digioskuste alane koolitus.
Vähemalt ühe projekti elluviimine
vähemalt 500 sotsiaalpiirkonnas, mis
on osalenud konkurentsivälises
menetluses.
M5C2–9 Investeering 3 –
Esmalt eluase ja
postijaamad
Eesmärk
Tegevusplaani
jõustumine seoses
projektidega „Esmalt
eluase“ ja
postijaamadega,
milles määratakse
kindlaks nõuded
projektidele, mida
võivad esitada
kohalikud üksused,
ning projektikonkursi
algatamine
Seaduse
sätted, mis
viitavad
sekkumiste
tegevuskava
jõustumisele
PUUDUVA
D
PUUDUV
AD
PUUDUV
AD 1. kv 2022
Tegevuskavas, mis käsitleb projekte
„Esmalt eluase“ ja postijaamade
kohta, määratakse kindlaks nõuded
projektidele, mida võivad esitada
kohalikud üksused, ning
projektikonkursi algatamine.
Projektides „Esmalt eluase“ nähakse
ette, et kohalikud üksused teevad
korterid kättesaadavaks
üksikisikutele, väikestele rühmadele
või peredele kuni 24 kuuks,
eelistatavalt hoonete renoveerimise
ja riigivara renoveerimise kaudu.
Seda täiendavad arengu- ja
autonoomiaprogrammid.
Postijaamu käsitlevates projektides
nähakse ette kodututele mõeldud
366
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
teenindus- ja kaasamiskeskuste
arendamine. Seda täiendavad
tööhõiveprogrammid koostöös
tööhõivekeskustega.
367
M.3. Laenuga seotud reformide ja investeeringute kirjeldus
Investeering 1 – Haavatavate inimeste toetamine ja institutsionaliseerimise ennetamine
Selle meetme eesmärk on toetada haavatavaid inimesi ja vältida institutsionaliseerimist. See meede hõlmab
sekkumisi haavatavatele peredele ja lastele, eakatele inimestele ja sotsiaaltöötajatele vähemalt 498 Itaalia
sotsiaalpiirkonnas.
Investeering 2 – Puuetega inimeste iseseisvuse mustrid
Selle meetme eesmärk on suurendada puuetega inimeste iseseisvust, kiirendades deinstitutsionaliseerimise
protsessi. Meede seisneb juurdepääsu võimaldamises eluasemele ja/või digitehnoloogiale ja -koolitusele.
Investeering 3 – Esmalt eluase ja postijaamad
Selle meetme eesmärk on kaitsta ja toetada tõrjutud inimeste kaasamist. Meede koosneb kahte liiki
kokkulepetest: lahendused „Esmalt eluase“, mis hõlmavad omavalitsusi, kes pakuvad üksikisikutele,
väikestele rühmadele või peredele kohandatud projekte ja majutust kuni 24 kuuks; ning „postijaamade“
lahendused, mis koosnevad teenindus- ja kaasamiskeskustest inimestele, kes elavad tingimustes, mis võivad
hõlmata suurt materiaalset puudust või kodutust, kuid ei piirdu nendega, või äärmusliku marginaliseerumise
tingimustes, pakkudes olulisi teenuseid, nagu esmatarbekaupade ja posti jaotamine, toitlustamine ja
tervishoid.
Investeering 4 – Investeeringud linnade taaselustamise projektidesse, mille eesmärk on vähendada
marginaliseerumist ja sotsiaalset degradeerumist
Meetme eesmärk on vähendada marginaliseerumist ja sotsiaalset degradeerumist, parandades omavalitsuste
sotsiaalset ja keskkonnakvaliteeti ning juurdepääsu sotsiaal- ja kultuuriteenustele. Investeering seisneb
linnade taaselustamise projektide toetamises, mis võivad hõlmata sekkumist avalikesse piirkondadesse,
hoonetesse või säästvasse liikuvusse, kuid ei piirdu sellega.
Investeering 5 – Linnade integreerimise kavad (üldprojektid ja ebaseaduslike asunduste ületamine, et
võidelda tööalase ärakasutamise vastu põllumajanduses)
Meetme eesmärk on taastada suured kahjustatud linnapiirkonnad. See investeering hõlmab kolme liiki
sekkumisi: i) integreeritud linnaplaneeringu projektid; ii) eluasemelahendused ebaseaduslike asunduste
ületamiseks; iii) temaatiline fond (fondifond) koostöös EIPga, et soodustada erainvesteeringuid linnade
taaselustamise algatustesse, mis toetavad kliima- ja digipööret.
Investeering 6 – Eluasemekvaliteedi innovatiivne kava
Meetme eesmärk on parandada sotsiaaleluruumide kvaliteeti või kvantiteeti ning renoveerida kahjustatud
piirkondi. Investeering koosneb järgmisest: i) renoveerimine (sealhulgas energiatõhususe meetmed) ja
sotsiaaleluruumide laiendamine; ii) linnaruumi ning avaliku ja eraomandi taaselustamine.
Investeering 7 – Sport ja sotsiaalne kaasatus
Meetme eesmärk on taastada linnapiirkondades spordirajatised ja nende kaadrid. Investeering seisneb
spordirajatiste ehitamise või renoveerimise toetamises.
368
M.4. Laenu eesmärgid, sihid, näitajad ning seire ja rakendamise ajakava
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (eesmärkide
puhul)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi
kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
M5C2–6
Investeering 1 –
Haavatavate inimeste
toetamine ja
institutsionaliseerimise
ennetamine
Siht
Meetmed haavatavate
inimeste toetamiseks
sotsiaalsetes
piirkondades
PUUDUVAD Number 0 498 2. kv 2026
Vähemalt 498
sotsiaalpiirkonda viivad
lõpule vähemalt ühe
järgmistest meetmetest:
i) haavatavate
perekondade ja laste
toetamine; ii) eakate
iseseisva elu toetamine;
iii) koduste
sotsiaalteenuste
osutamine, et tagada
varajane ja toetatud
haiglast väljakirjutamine
ning vältida haiglaravi;
iv) sotsiaaltöötajate
toetamine.
M5C2–8
Investeering 2 –
Puuetega inimeste
iseseisvuse mustrid
Siht
Toetusesaajatele on
antud juurdepääs
eluasemele ja/või IKT-
seadmetele, millega
kaasneb digioskuste
alane koolitus
PUUDUVAD Number 0 3 120 2. kv 2026
Vähemalt 3 120
toetusesaajale on antud
juurdepääs eluasemele
ja/või IKT-seadmetele.
IKT-seadmeid saavad
toetusesaajad osalevad
ka digioskuste
koolitusel.
M5C2–10 Investeering 3 –
Esmalt eluase ja Siht Esmaeluaseme- ja PUUDUVAD Number 0 12 364 2. kv 2026 Esimesena eluaseme
puhul allkirjastasid
369
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (eesmärkide
puhul)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi
kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
postijaamad postijaamade projektid 1 318 individuaalset
projekti ( progetto
personalizzato), mis
tõendasid, et ajutist
majutust pakuti
minimaalselt 6 ja
maksimaalselt 24
kuuks. Lisaks tuleb iga
toetusesaaja kohta
esitada ka tõend
asjaomase projekti
infrastruktuuriga seotud
tööde lõpetamise kohta.
Postijaamade puhul
allkirjastati 11 046
individuaalset projekti (
progetto
personalizzato), mis
tõendavad teenuse
osutamist. Iga
toetusesaaja kohta
esitatakse ka tõend
asjaomase projekti
taristuga seotud tööde
lõpuleviimise kohta.
M5C2–11
Investeering 4 –
Investeeringud linnade
taaselustamise
projektidesse, mille
Eesmärk
Kõigi
riigihankelepingute
sõlmimine
investeeringuteks
Kõigist
riigihankelepingutest
teatamine
investeeringuteks
PUUDUVAD PUUDUVAD PUUDUVAD 1. kv 2022
Kõigist riigihankelepingutest teatamine, mis on sõlmitud vähemalt 300
370
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (eesmärkide
puhul)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi
kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
eesmärk on
vähendada
marginaliseerumist ja
sotsiaalset
degradeerumist
linnade
taaselustamisse, et
vähendada
marginaliseerumist ja
sotsiaalset
degradeerumist, koos
projektidega, mis on
kooskõlas taaste- ja
vastupidavusrahastu
eesmärkidega,
sealhulgas
põhimõttega „ei
kahjusta oluliselt“
linnade
taaselustamisse, et
vähendada
marginaliseerumist ja
sotsiaalset
degradeerumist, koos
projektidega, mis on
kooskõlas taaste- ja
vastupidavusrahastu
eesmärkidega,
sealhulgas
põhimõttega „ei
kahjusta oluliselt“
üle 15 000 elanikuga omavalitsusega investeeringute tegemiseks linnade taaselustamisse, et vähendada marginaliseerumist ja sotsiaalset degradeerumist, koos projektidega, mis on kooskõlas taaste- ja vastupidavusrahastu eesmärkidega, sealhulgas põhimõttega „ei kahjusta oluliselt“.
Toetusi antakse üle 15 000 elanikuga omavalitsustele, mis ei ole provintside pealinnad, provintside pealinnad ega suurlinnade peakorterid.
Linnapõlvkonna projektid hõlmavad vähemalt ühte järgmistest sekkumistest:
• Avalike alade ja
olemasolevate
avalike
371
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (eesmärkide
puhul)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi
kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
ehituskonstruktsioo
nide
korduskasutamine
ja
taasfunktsionaalse
ks muutmine
avaliku huvi
eesmärgil,
sealhulgas
eraisikute
kuritahtlike teoste
lammutamine
ehitusloa
puudumise või
täieliku lahknevuse
korral ehitusloast ja
asjaomaste alade
korraldusest;
• Linnamaastiku ning
sotsiaalse ja
keskkonnastruktuu
ri kvaliteedi
parandamine,
sealhulgas
üldkasutatavate
hoonete
renoveerimise
kaudu, pöörates
372
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (eesmärkide
puhul)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi
kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
erilist tähelepanu
sotsiaal- ja kultuuri-
, haridus- ja
didaktiliste
teenuste
arendamisele;
• Keskkonnahoidliku,
säästva ja aruka
transpordi
projektid.
Maksimumsummad
omavalitsuse kohta on
järgmised:
5000000 eurot omavalitsusüksustele,
mille elanike arv jääb
vahemikku 15 000 kuni
49 999;
10 000 000 eurot
omavalitsusüksuste
puhul, mille elanike arv
on 50 000 kuni 100 000;
20 000 000 eurot
omavalitsusüksuste
puhul, mille elanike arv
on suurem kui 100 000,
ja omavalitsusüksuste
373
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (eesmärkide
puhul)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi
kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
puhul, mis on
provintsipealinnad või
suurlinnad.
M5C2–12
Investeering 4 –
Investeeringud linnade
taaselustamise
projektidesse, mille
eesmärk on
vähendada
marginaliseerumist ja
sotsiaalset
degradeerumist
Siht Elluviidud projektid PUUDUVAD Number 0 1 080 2. kv 2026
Haldustõendid, mis
kinnitavad, et ellu on
viidud vähemalt 1 080
projekti, mis hõlmavad vähemalt 1 000 000
ruutmeetrit.
M5C2–13
Investeering 5 –
Linnade integreeritud
kavad – üldprojektid
Eesmärk
Suurlinnapiirkondade
linnade taaselustamise
projektide
investeerimiskava
jõustumine
Seaduse säte, mis
viitab
suurlinnapiirkondade
linnade taaselustamise
projektide kava
jõustumisele
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2022
Investeerimiskavaga
kehtestatakse
kriteeriumid, mis on
kooskõlas taaste- ja
vastupidavusrahastu
eesmärkidega,
sealhulgas põhimõttega
„ei kahjusta oluliselt“.
Projektid on seotud
järgmiste
sekkumisliikidega:
a) hooldus
üldkasutatavate
ruumide
taaskasutamiseks ja
uuesti kasutamiseks.
374
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (eesmärkide
puhul)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi
kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
b) Linnade décor’i ning
sotsiaalse ja
keskkonnaalase
struktuuri kvaliteedi
parandamine.
c) linnapiirkondade
keskkonnakvaliteedi ja
digitaalse profiili
parandamine.
M5C2–14
Investeering 5 –
Linnade integreeritud
kavad – üldprojektid
Siht Elluviidud projektid PUUDUVAD Number 0 300 2. kv 2026
Haldustõendid, mis
kinnitavad, et 14
suurlinnas on ellu viidud
vähemalt 300
integreeritud
linnaplaneeringu
projekti, mille
kogupindala on
vähemalt 3 000 000
ruutmeetrit.
M5C2–15
Investeering 5 –
Linnade integreeritud
kavad – ebaseaduslike
asunduste ületamine,
et võidelda tööalase
ärakasutamise vastu
põllumajanduses
Eesmärk
Ebaseaduslike
asunduste
kaardistamist käsitleva
ministri käskkirja
jõustumiseks on vastu
võetud „Tavolo di
contrasto allo
sfruttamento lavorativo
in agricoltura“ ja
Seaduse säte, mis
viitab ministri dekreedi
jõustumisele
PUUDUVAD PUUDUVAD PUUDUVAD 1. kv 2022
Ministri dekreediga
eraldatakse vahendeid
„Tavolo di contrasto allo
sfruttamento lavorativo
in agricoltura“
ebaseaduslike
asunduste
kaardistamise alusel.
Määratakse kindlaks
375
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (eesmärkide
puhul)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi
kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
ressursside eraldamist
käsitlev ministri
käskkiri.
ajutiste ja pikaajaliste
eluasemelahenduste
standard.
M5C2–16
Investeering 5 –
Linnade integreeritud
kavad – ebaseaduslike
asunduste ületamine,
et võidelda tööalase
ärakasutamise vastu
põllumajanduses
Siht Eluasemeprojektid ja
platvormi loomine PUUDUVAD 0 9 2. kv 2026
Üheksa projekti viiakse
ellu kooskõlas
voodikohtade arvu ja
eluasemestandarditega,
mis on kindlaks
määratud
rakendusasutuste
allkirjastatud lepingutes.
Luuakse
põllumajanduses tööjõu
ekspluateerimist
käsitlev digiplatvorm
(Sistema informativo
per il contrasto al
caporalato), mis
võimaldab kasutada
interaktiivset töölauda.
M5C2–17
Investeering 5 –
Linnade integreeritud
kavad – EIP fond
Eesmärk
Fondi
investeerimisstrateegia
on heaks kiitnud
rahandusministeerium.
Fondi
investeerimisstrateegia
on heaks kiitnud
rahandusministeerium
PUUDUVAD PUUDUVAD PUUDUVAD 3. kv 2022
Fondi
investeerimisstrateegias
määratakse kindlaks
vähemalt järgmine: i)
toetatavate
investeeringute laad ja
ulatus, millega
edendatakse linnade
376
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (eesmärkide
puhul)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi
kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
kestlikku taaselustamist
ja arenguprojekte ning
mis on kooskõlas
taaste- ja
vastupidavusrahastu
eesmärkidega,
sealhulgas seoses
põhimõtte „ei kahjusta
oluliselt“ järgimisega,
nagu on täpsustatud
komisjoni 12. veebruari
2021. aasta suunises, ii)
toetatavad tegevused,
iii) sihtrühma kuuluvad
toetusesaajad, kes on
selliste rahaliselt
isemajandavate
projektide erasektori
arendajad, mille puhul
avaliku sektori toetust
õigustab turutõrge või
riskiprofiil, ja nende
rahastamiskõlblikkuse
kriteeriumid, iv)
toetusesaajate
rahastamiskõlblikkuse
kriteeriumid ja nende
valimine avaliku
projektikonkursi kaudu;
v) eraldi eelarverea
377
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (eesmärkide
puhul)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi
kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
lisamine põllumajandus-
ja tööstussektori
töötajate inimväärsete
eluasemelahenduste
jaoks ning vi) sätted
võimalike
tagasisaadavate
vahendite
reinvesteerimiseks
samade
poliitikaeesmärkide
saavutamiseks ka
pärast 2026. aastat.
Volitatud üksusega
sõlmitavas lepingus,
milles nõutakse
põhimõtte „ei kahjusta
oluliselt“ kohaste
suuniste kasutamist.
M5C2–18
Investeering 5 –
Linnade integreeritud
kavad – EIP fond
Siht
Lõplike abisaajatega
sõlmitud juriidilised
lepingud, mille aluseks
olevate projektide
investeerimisväärtus
on vähemalt
545000000 eurot
PUUDUVAD EUR 0 545 000
000 4. kv 2025
Valitud
finantsvahendajad
peavad olema sõlminud
lõplike toetusesaajatega
seaduslikud
rahastamislepingud,
mille aluseks olevate
projektide
investeerimisväärtus on
vähemalt 545 000 000
378
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (eesmärkide
puhul)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi
kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
eurot (sealhulgas
taaste- ja
vastupidavusrahastu
ning erasektori
rahalised vahendid).
Majandus- ja
rahandusministeerium
on viinud lõpule
272 000 000 euro
ülekandmise Euroopa
Investeerimispangale.
M5C2–19
Investeering 6 –
Eluasemekvaliteedi
innovatsiooniprogramm
Eesmärk
Piirkonnad ja
autonoomsed
provintsid (sealhulgas
nendel territooriumidel
asuvad omavalitsused
ja/või suurlinnad)
allkirjastasid lepingud
sotsiaaleluruumide
ümberkujundamiseks
ja suurendamiseks.
Lepingud kohalike
omavalitsustega
allkirjastatakse
PUUDUVAD PUUDUVAD PUUDUVAD 1. kv 2022
Vähemalt 15 piirkonda
ja autonoomset
provintsi (sealhulgas
nendel territooriumidel
asuvad omavalitsused
ja/või suurlinnad)
allkirjastasid lepingud
sotsiaaleluruumide
ümberkujundamiseks ja
suurendamiseks.
Lepingud on
allkirjastatud vähemalt
15 projekti kaasatud
piirkonna ja
autonoomse
provintsiga.
379
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (eesmärkide
puhul)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi
kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
Hoone: uued
sotsiaaleluruumid, et:
– kujundama ümber,
reorganiseerima ja
suurendama
sotsiaaleluruumideks
mõeldud varasid;
– taaskasutada alasid,
ruume ning avalikku ja
eraomandit ka linna- ja
sotsiaal-majandusliku
struktuuri
taaselustamise kaudu;
– parandada
linnapiirkondade
juurdepääsetavust ja
ohutust ning teenuste ja
linna-kohaliku taristu
pakkumist;
– taastada juba ehitatud
alad ja alad,
parandades
keskkonnakvaliteeti ja
parandades
kliimamuutustele
vastupanu võimet ka
tegevuse kaudu, mis
mõjutab linnade
380
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (eesmärkide
puhul)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi
kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
asustustihedust;
– teha kindlaks ja
kasutada uuenduslikke
juhtimis- ja
kaasamismudeleid ja -
vahendeid, sotsiaalset
ja linnade heaolu ning
osalusprotsesse.
Toetatavad
elamuüksused ja avalik
ruum peavad saama
kasu asjaomase vahe-
eesmärgi all kirjeldatud
tegevustest.
M5C2–20
Investeering 6 –
Eluasemekvaliteedi
innovatsiooniprogramm
Siht
Ehitatud, ostetud või
renoveeritud
elamuüksuste arv
PUUDUVAD Number 0 10 000 2. kv 2026
Ehitatakse, ostetakse
või renoveeritakse
vähemalt 10 000
elamuüksust ning
renoveeritakse
vähemalt 1 800 000
ruutmeetrit avalikku
ruumi.
Vähemalt 100 miljonit
eurot taaste- ja
vastupidavusrahastu
toetusest
investeerimiskuludele
381
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (eesmärkide
puhul)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi
kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
eraldatakse
olemasoleva elamufondi
või avaliku taristu
energiatõhusaks
renoveerimiseks või
selliste hoonete
ehitamiseks, mille
primaarenergia
tarbimine on vähemalt
20 % väiksem kui
liginullenergiahoonete
nõue.
Vähemalt 350 miljonit
eurot eraldatakse
olemasoleva elamufondi
või avaliku taristu
energiatõhusaks
renoveerimiseks, mille
tulemuseks on vähemalt
30 % primaarenergia
sääst.
382
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (eesmärkide
puhul)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi
kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
M5C2–21
Investeering 7 – Spordi
ja sotsiaalse kaasatuse
projekt
Eesmärk
Kõigi
riigihankelepingute
sõlmimine spordi ja
sotsiaalse kaasamise
projektide jaoks pärast
avalikku
projektikonkurssi
Teade kõigi
riigihankelepingute
sõlmimise kohta spordi
ja sotsiaalse
kaasamise projektide
puhul
PUUDUVAD PUUDUVAD PUUDUVAD 1. kv 2023
Riigihankelepingute
sõlmimise teade, mis
sisaldab vähemalt ühte
järgmistest
elementidest:
1. uute spordirajatiste
ehitamine riigi
ebasoodsas olukorras
olevatesse
piirkondadesse;
2. spordivarustuse
tarnimine, sealhulgas
tehnoloogia
rakendamine spordis);
3. Olemasolevate
spordirajatiste
ümberkvalifitseerimine
ja kohandamine
(näiteks: arhitektuuriliste
tõkete kõrvaldamine,
energiatõhusus jne).
Projekti eesmärk on
tagada linnapiirkondade
taaselustamine,
keskendudes
spordirajatistele, et
edendada sotsiaalset
kaasatust ja
383
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (eesmärkide
puhul)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi
kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
integratsiooni, eelkõige
Itaalia enim puudust
kannatavates
piirkondades.
Valikukriteeriumidega
tagatakse, et vähemalt
50 % investeeringust
eraldatakse uutele
ehitistele, mis vastavad
määruse (EL) 2021/241
VI lisa joonealuses
märkuses 5 esitatud
asjakohastele nõuetele.
M5C2–22 Investeering 7 – Sport
ja sotsiaalne kaasatus Siht
Haldustõendid
spordirajatiste
ehitamise või
renoveerimisega
seotud sekkumiste
kohta
PUUDUVAD Number 0 100 2. kv 2026
Haldussertifikaadid, mis
kinnitavad, et
spordirajatiste ehitamise
või renoveerimisega
seoses on tehtud
vähemalt 100
sekkumist, mille
kogupindala on
vähemalt 200 000
ruutmeetrit
384
ÜLESANDE 5 KOMPONENT 3: Territoriaalse ühtekuuluvuse erisekkumised
Taaste- ja vastupidavuskava see komponent hõlmab kahte sekkumisvaldkonda: i) sise-, ääre- ja
mägipiirkondade vastupanuvõime kava; ii) projektid lõunapoolsete riikide arendamiseks, sealhulgas
investeeringud haridusliku vaesuse vastu võitlemiseks, maapiirkondade apteekide kui kohalike
tervishoiuteenuste konsolideerimiseks, organiseeritud kuritegevusest konfiskeeritud varade suurendamiseks
ja taristuinvesteeringuteks erimajandustsoonides. Nende meetmete eesmärk on vähendada territoriaalset
lõhet kolmes valdkonnas: demograafia ja teenused; oskuste arendamine; investeeringud.
Käesoleva rahastamisvahendi raames tehtavad investeeringud ja reformid aitavad täita 2019. ja 2020. aastal
Itaaliale esitatud riigipõhiseid soovitusi vajaduse kohta keskenduda investeeringutega seotud
majanduspoliitikas teadusuuringutele ja innovatsioonile ning taristu kvaliteedile, võttes arvesse piirkondlikke
erinevusi (riigipõhine soovitus 2019.3); „parandada haridustulemusi“ (riigipõhine soovitus
2019.2); „Tugevdada tervishoiusüsteemi vastupanuvõimet ja suutlikkust [...]“ (riigipõhine soovitus
2020.1); „tagada piisav [...] ja juurdepääs sotsiaalkaitsele“ (riigipõhine soovitus 2020.2).
N.1. Tagastamatu rahalise toetusega seotud reformide ja investeeringute kirjeldus
Investeering 1.1. Sisealad – 1: Kogukonna sotsiaalteenuste ja -taristute tõhustamine
Sekkumise eesmärk on tegeleda sotsiaalse tõrjutuse ja marginaliseerumise küsimustega, tõhustades teenuste
osutamist, suurendades kohalike omavalitsuste osutatavate avalike teenuste jaoks ette nähtud rahalisi
vahendeid (rakendamismehhanism seisneb toetuste andmises omavalitsustele). Rahastatavad projektid
võivad hõlmata järgmist: eakate koduhooldusteenused; kogukonnaõed ja ämmaemandad; tugevdada
väikehaiglaid (ilma esmaabita) või mõningaid põhiteenuseid (nt radioloogia, kardioloogia, günekoloogia) ja
ambulatoorseid keskusi; kopterite päästetööde infrastruktuurid; puuetega inimestele mõeldud keskuste
tugevdamine; nõustamiskeskused, kultuuriteenused, sporditeenused ja rändajate vastuvõtmine. Sekkumisega
nähakse ette kas uute teenuste ja taristute loomine või olemasolevate parandamine teenusesaajate arvu või
pakkumise kvaliteedi suurendamise kaudu.
Tagamaks, et meede vastab „ei kahjusta oluliselt“ tehnilistele suunistele (2021/C58/01), jäetakse tulevaste
projektikonkursside juhendites sisalduvatest rahastamiskõlblikkuse kriteeriumidest välja järgmised
tegevused: i) fossiilkütustega seotud tegevus, sealhulgas allkasutus88; ii) ELi heitkogustega kauplemise
süsteemi (HKS) raames toimuv tegevus, millega saavutatakse prognoositud kasvuhoonegaaside heide, mis ei
ole asjaomastest võrdlusalustest väiksem89; iii) tegevus, mis on seotud prügilate, jäätmepõletustehaste90 ja
mehaanilis-bioloogilise töötlemise jaamadega91; ning iv) tegevused, mille puhul pikaajaline jäätmete
kõrvaldamine võib keskkonda kahjustada. Peale selle peab rahastamiskõlblikkuse kriteeriumides olema
88 Välja arvatud käesoleva meetme kohased elektri- ja/või soojusenergia tootmise ning maagaasi ülekande- ja
jaotustaristuga seotud projektid, mis vastavad põhimõtte „Ei kahjusta oluliselt“ tehniliste suuniste (2021/C58/01) III
lisas sätestatud tingimustele. 89 Kui toetatava tegevuse prognoositav kasvuhoonegaaside heide ei ole asjaomasest võrdlusalusest oluliselt madalam,
tuleks esitada selgitus põhjuste kohta, miks see ei ole võimalik. Saastekvootide tasuta eraldamise võrdlusalused
saastekvootidega kauplemise süsteemi kohaldamisalasse kuuluvate tegevuste jaoks on sätestatud komisjoni
rakendusmääruses (EL) 2021/447. 90 Välistamist ei kohaldata meetme tegevuste suhtes, mis toimuvad üksnes ringlussevõetamatute ohtlike jäätmete
töötlemisega tegelevates jaamades, ega olemasolevate jaamade suhtes, kui meetme tegevuste eesmärk on suurendada
energiatõhusust, koguda heitgaase ladustamiseks või kasutamiseks või taaskasutada põletustuhas leiduvaid materjale,
tingimusel et need tegevused ei suurenda jaamade jäätmetöötlusvõimsust ega pikenda nende kasutusiga; tõendid selle
kohta tuleb esitada iga jaama kohta eraldi. 91 Välistamist ei kohaldata meetme tegevuste suhtes, mis toimuvad olemasolevates mehhaanilis-bioloogilise töötlemise
jaamades, kus nende tegevuste eesmärk on suurendada energiatõhusust või moderniseerida eraldatud jäätmete
ringlussevõttu biojäätmete kompostimiseks ja biojäätmete anaeroobseks lagundamiseks, tingimusel et need tegevused ei
suurenda jaamade jäätmetöötlusvõimsust ega pikenda nende kasutusiga; tõendid selle kohta tuleb esitada iga jaama
kohta eraldi.
385
sätestatud tingimus, et valida võib ainult tegevusi, mis vastavad asjakohastele ELi ja riiklikele
keskkonnaalastele õigusaktidele.
Investeering 1.1.2: Territoriaalse läheduse tervishoiuasutused
Meetme eesmärk on tugevdada maapiirkondade apteekide rolli tervishoiuteenuste osutamisel kohalikule
elanikkonnale, näiteks integreeritud koduabi ja patsientide jälgimise valdkonnas, mis omakorda hõlbustab
patsiendi ja riikliku tervishoiusüsteemi vahelist suhtlust. Investeering seisneb maapiirkondade apteekide
rahalises toetamises.
Investeering 1.3: Struktureeritud sotsiaal-haridusmeetmed haridusvaesuse vastu võitlemiseks lõunas,
millega toetatakse kolmandat sektorit
Meetme eesmärk on pakkuda alaealistele sotsiaalharidusteenuseid, parandada juurdepääsu lapsehoiule ja
haridusvõimalustele ning vältida koolist väljalangemist ja haridussüsteemist varakult lahkumist. Investeering
koosneb kolmanda sektori organisatsioonide juhitavast haridusalasest toetustegevusest.
386
N.2. Tagastamatu rahalise toetuse eesmärgid, sihid, näitajad ning seire ja rakendamise ajakava
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
M5C3–1
Investeering 1.1.1:
Sisevaldkonnad –
Kogukonna
sotsiaalteenuste ja
-taristu
tõhustamine
Eesmärk
Hankemenetluse
sõlmimine
sekkumisteks, mille
eesmärk on parandada
sotsiaalteenuseid ja -
taristut sisepiirkondades
ning toetada apteeke
alla 3000 elanikuga
omavalitsusüksustes
Teade kõigi
sekkumistega
seotud
riigihankelepingute
sõlmimise kohta
PUUDUVAD PUUDUVAD PUUDUV
AD 4. kv 2022
Sekkumisega luuakse uusi
teenuseid ja taristuid või
parandatakse olemasolevaid
teenusesaajate arvu või
pakkumise kvaliteedi
suurendamise kaudu.
Kõik projektikonkursid
kuulutatakse välja vastavalt
pädevusele, sealhulgas
rahastamiskõlblikkuse
kriteeriumidele, millega
tagatakse, et valitud projektid
vastavad põhimõtte „ei kahjusta
oluliselt“ tehnilistele suunistele
(2021/C58/01), kasutades
välistamisnimekirja ning nõuet
järgida asjakohaseid ELi ja
riiklikke keskkonnaalaseid
õigusakte.
Sisealad on määratletud
Strategia Nazionale Aree
Interne’is; Maapiirkondade
apteegid määratletakse seaduse
alusel. 27. märts 1968, nr 212.
387
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
M5C3–3
Investeering 1.1.2:
Territoriaalse
lähedusega
tervishoiuasutused
Siht
Toetus maapiirkondade
apteekidele alla 5000
elanikuga
omavalitsusüksustes,
külades või asulates
(esimene partii)
PUUDUVAD Number 0 500 4. kv 2023
Sekkumisest saavad kasu
vähemalt 500 apteeki
omavalitsusüksustes, asulates
või asulates, kus on alla 5 000
elaniku.
M5C3–8
Investeering 1.3:
Struktureeritud
sotsiaal-
haridusmeetmed
haridusvaesuse
vastu võitlemiseks
lõunas, millega
toetatakse
kolmandat sektorit
Siht
Alaealistele mõeldud
haridustoetus (esimene
osa)
PUUDUVAD Number 0 20 000 2. kv 2023
Haridustoetust antakse vähemalt
20 000 kuni 17aastasele
alaealisele. Projektid
keskenduvad ühele järgmistest
valdkondadest:
• 0–6aastastele lastele suunatud
sekkumised, mille eesmärk on
parandada lasteaia- ja
lasteaiateenustele juurdepääsu
tingimusi ning toetada
lapsevanemaks olemist;
• 5–10-aastastele lastele
suunatud meetmed, mille
eesmärk on tagada tõhusad
haridusvõimalused ning varakult
ennetada koolist väljalangemist,
kiusamist ja muid stressinähtusi;
• 11–17-aastastele lastele
suunatud meetmed, mille
388
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik ajakava
Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsenaarium Eesmärk Nõuded Aasta
eesmärk on parandada hariduse
pakkumist ja ennetada
haridussüsteemist varakult
lahkumist.
Pakkumuse põhielemendid:
– Avalike teadaannete
maksumus on vähemalt
50 000 000 eurot – Kolmanda sektori üksuste
projektid kestavad vähemalt ühe
aasta ja kuni kaks aastat.
Meetmed võetakse Abruzzo,
Basilicata, Campania, Calabria,
Molise, Apuulia, Sardiinia ja
Sitsiilia piirkonnas.
M5C3–9
Investeering 1.3:
Struktureeritud
sotsiaal-
haridusmeetmed
haridusvaesuse
vastu võitlemiseks
lõunas, millega
toetatakse
kolmandat sektorit
Siht Hariduslik tugi
alaealistele (teine rühm) PUUDUVAD Number 20 000 44 000 4. kv 2025
Registreerimisvormid ja
registreerimiskinnitused
vähemalt 44 000 alaealisele
vanuses 0–17 aastat, kellele
pakutakse haridusalast tuge.
389
390
N.3. Laenuga seotud reformide ja investeeringute kirjeldus
Reform 1: Menetluste lihtsustamine ja voliniku tugevdamine erimajandustsoonides
Reform aitab kaasa juhtimissüsteemi lihtsustamisele ja erimajandustsoonides sekkumiste rakendamise aja
ühtlustamisele. Reformiga luuakse erimajandustsoonide jaoks digitaalne ühtne kontaktpunkt ja tugevdatakse
komissari rolli.
Investeering 1.1.2: Territoriaalse läheduse tervishoiuasutused
Meetme eesmärk on tugevdada maapiirkondade apteekide rolli tervishoiuteenuste osutamisel kohalikule
elanikkonnale, näiteks integreeritud koduabi ja patsientide jälgimise valdkonnas, mis omakorda hõlbustab
patsiendi ja riikliku tervishoiusüsteemi vahelist suhtlust. Investeering seisneb maapiirkondade apteekide
rahalises toetamises.
Investeering 1.4: Taristuinvesteeringud erimajandustsoonides
Investeeringu eesmärk on tagada erimajandustsoonide loomise reformi mõju. Investeering seisneb
taristumeetmete toetamises sadamapiirkondade ümber („viimase miili“ ühendused; digitaalne logistika,
linnastumine või energia- ja keskkonnatõhusus; sadamataristud).
391
N.4. Laenu eesmärgid, sihid, näitajad ning seire ja rakendamise ajakava
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
M5C3–10
Reform 1:
Menetluste
lihtsustamine ja
voliniku
tugevdamine
erimajandustsoonid
es
Eesmärk
Määruse
jõustumine, et
lihtsustada
menetlusi ja
tugevdada
voliniku rolli
erimajandustso
onides
Määruse jõustumise
säte, millega
lihtsustatakse
menetlusi ja
tugevdatakse
voliniku rolli
erimajandustsoonid
es
PUUDUVAD PUUDUV
AD PUUDUVAD 4. kv 2021
Määrus sisaldab järgmist: asjaomase
erimajandustsoonide jaoks digitaalse ühtse
kontaktpunkti loomine menetluste
lihtsustamiseks; sätted voliniku rolli
tugevdamiseks ZESis.
Erimajandustsoonid on eripiirkonnad, mis on
määratletud dekreetseaduses 91/2017
(avaldatud ametlikus väljaandes 141/2017),
mis muudeti seaduseks seadusega L.
123/2017 (avaldatud ametlikus väljaandes
Mezzogiorno 188/2017).
M5C3–11
Investeering 1.4:
Taristuinvesteeringu
d
erimajandustsoonis
Eesmärk
Kõigi kaheksa
erimajandustso
oni tegevuskavu
heaks kiitvate
ministeeriumide
dekreetide
jõustumine
Seaduse säte, mis
viitab ministeeriumi
dekreetide
jõustumisele.
PUUDUVAD PUUDUV
AD PUUDUVAD 4. kv 2021
Dekreediga eraldatakse vahendid
rakendamise eest vastutavatele isikutele ja
määratakse kindlaks eritingimused, et vältida
sekkumiste keskkonnamõju.
Kõik projektikonkursid kuulutatakse välja
vastavalt pädevusele, sealhulgas
rahastamiskõlblikkuse kriteeriumidele, millega
tagatakse, et valitud projektid vastavad
põhimõtte „ei kahjusta oluliselt“ tehnilistele
suunistele (2021/C58/01), kasutades
välistamisnimekirja ning nõuet järgida
asjakohaseid ELi ja riiklikke keskkonnaalaseid
õigusakte.
392
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
M5C3–12
Investeering 1.4:
Taristuinvesteeringu
d
erimajandustsoonis
Siht
Infrastruktuuripr
ojektidega
seotud tööde
alustamine
erimajandustso
onis
PUUDUVAD Number 0 53 4. kv 2024
Infrastruktuuriprojektid identifitseerib üheselt
nende Codice Locale di Progetto (CLP).
Alustatud on vähemalt 53 projektiga, mis on
kehtestatud vahendite eraldamise dekreediga.
M5C3–13
Investeering 1.4:
Taristuinvesteeringu
d
erimajandustsoonis
Siht
Erimajandustso
oni
taristuprojektide
lõpuleviimine
PUUDUVAD Number 0 46 2. kv 2026
Haldussertifikaadid, mis kinnitavad, et
projektid on ellu viidud, väljastatakse vähemalt
46 projektile, mis on kehtestatud vahendite
eraldamise dekreediga ja mille on üheselt
identifitseerinud Codice Unico di Progetto
(CUP) ja/või Codice Locale di Progetto (CLP).
Lõpetatud projektide loetelu sisaldab järgmist:
- Porto di Salerno. Piirkonna portaal. Consolidamento ed adeguamento funzionale di alcuni moli e banchine (CLP: G51B21003170006)
- Porto di Napoli. Piirkonna portaal. Prolungamento e rafforzamento della diga Duca D’Aosta (CUP: G65F20001560006)
- Porto di Salerno. Dragaggio del porto commerciale di Salerno e del canale di ingresso – fase 2 – Molo di ponente (CLP: G51B21003160006)
- Porto Canale Di Cagliari. Piirkonna portaal. Avamporti: realizzazione di nuovi banchinamenti per l’ormeggio di navi
393
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
Traghetto ro-ro (CLP: D21G06000020003)
M5C3–4
Investeering 1.1.2:
Territoriaalse
lähedusega
tervishoiuasutused
Eesmärk
Toetus
maapiirkondade
apteekidele alla
5000 elanikuga
omavalitsusüks
ustes, külades
või asulates
(teine partii)
Viimast väljamakset
lubavate dekreetide
vastuvõtmine
PUUDUVAD PUUDUV
AD PUUDUVAD 2. kv 2026
Dekreedid, millega antakse luba teha lõplik
väljamakse vähemalt 1 500 apteegile alla
5 000 elanikuga omavalitsusüksustes, külades
või asulates.
394
O. MISSIOON 6 KOMPONENT 1: Lähivõrgud, ruumid ja telemeditsiin
territoriaalseks tervishoiuabiks
Selle komponendi eesmärk on tugevdada Itaalia riiklikku tervishoiuteenistust, muu hulgas tõhustades
kaitset keskkonna ja kliimamuutustega seotud terviseriskide eest ning vastates paremini kogukondade
vajadustele seoses kohaliku hoolduse ja abiga. Kohalik tervishoiuabi on killustatud ja sõltub
piirkondlikest erinevustest, mille tulemuseks on tervishoiuteenuste osutamise ja tervisenäitajate erinev
tase piirkonniti. Integreeritud koduhooldusteenuste pakkumist peetakse väikeseks ning erinevaid
tervishoiu- ja sotsiaalteenuste osutajaid peetakse ainult nõrgalt integreerituks. Lisaks on Itaalia riikliku
tervishoiuteenistuse (NHS) suutlikkust tegeleda keskkonnaga kokkupuutest ja kliimamuutustest
tulenevate terviseriskidega katsetanud mitu keskkonnakriisi ja hädaolukorda, mis tõid esile piisavate
ennetusmeetmete puudumisest tulenevad probleemid. Itaalia taaste- ja vastupidavuskava selle
komponendi eesmärk on tugevdada Itaalia riiklikku tervishoiuteenistust, muu hulgas tõhustades
kaitset keskkonna ja kliimamuutustega seotud terviseriskide eest ning vastates paremini kogukondade
vajadustele seoses kohaliku hoolduse ja abiga.
Selle komponendi investeeringud ja reformid aitavad täita 2019. ja 2020. aastal Itaaliale esitatud
riigipõhiseid soovitusi vajaduse kohta „keskenduda investeeringutega seotud majanduspoliitikas
teadusuuringutele ja innovatsioonile ning taristu kvaliteedile, võttes arvesse piirkondlikke erinevusi
(riigipõhine soovitus 3, 2019), „tugevdada tervishoiusüsteemi vastupanuvõimet ja suutlikkust
tervishoiutöötajate, elutähtsate meditsiinitoodete ja taristu valdkonnas“ (riigipõhine soovitus 1, 2020)
ning „keskenduda investeeringutes rohe- ja digipöördele, eelkõige [...] tugevdatud digitaristule, et
tagada elutähtsate teenuste osutamine“ (riigipõhine soovitus 3, 2020).
O.1. Tagastamatu rahalise toetusega seotud reformide ja investeeringute kirjeldus
PUUDUVAD
O.2. Tagastamatu rahalise toetuse eesmärgid, sihid, näitajad ning seire ja rakendamise
ajakava
PUUDUVAD
395
O.3. Laenuga seotud reformide ja investeeringute kirjeldus
Reform 1: Territoriaalse tervishoiu abivõrgustiku uue organisatsioonilise mudeli määratlemine.
Reform on komponendi investeeringute ettevalmistav element. Sellega kehtestatakse territoriaalse
tervishoiuabi uus mudel ja luuakse tervise-, keskkonna- ja kliimaennetuse uus institutsiooniline
struktuur. See saavutatakse järgmiste meetmete abil:
1. Territoriaalse tervishoiuabi võrgustiku uue organisatsioonilise mudeli loomine, määratledes
reguleeriva raamistiku, milles määratakse kindlaks struktuurilised, tehnoloogilised ja
organisatsioonilised standardid.
2. Tervise, keskkonna ja kliimaga seotud ennetustegevuse uue institutsioonilise struktuuri
määratlemine, järgides integreeritud lähenemisviisi (ühtne tervis) ja terviklikku visiooni
(rahvatervis).
Investeering 1.1: Kogukonna tervisemajad territoriaalse tervishoiuabi parandamiseks.
Meetme eesmärk on luua kogukonna tervisemajad.
Investeering seisneb esmatasandi tervishoiuteenuste aktiveerimises ja koondamises ning
(energiatõhusate) abiandmiskeskuste rajamises, et reageerida integreeritud viisil hooldusvajadustele.
Investeering 1.2: Kodu kui esimene hoolduskoht ja telemeditsiin
Meetme eesmärk on edendada koduhooldust ja telemeditsiini lahenduste ulatuslikku kasutuselevõttu
ning toetada tervishoiualast innovatsiooni.
Investeering koosneb riistvarast ja suuremast teenuste osutamisest, territoriaalsete
koordineerimiskeskuste (Centrali Operative Territoriali) loomisest, diagnostika- ja seireprojektide
rahastamisest, telemeditsiiniprojektide sõeluuringute riikliku platvormi loomisest ning digitaalsete
tervishoiu- ja hooldustehnoloogiate ad hoc teadusalgatustest.
Investeering 1.3: Tugevdada vahetasandi tervishoidu ja selle rajatisi (kogukonnahaiglad)
Meetme eesmärk on suurendada vahetasandi tervishoiuasutuste arvu.
Investeering seisneb hooldusteenuste aktiveerimises kogukonnahaiglates, tervishoiuasutustes
patsientidele, kes vajavad pärast kerget tüsistust või krooniliste haiguste taastekkimist
väheintensiivseid ja lühiajalisi kliinilisi sekkumisi.
396
O.4. Laenu eesmärgid, sihid, näitajad ning seire ja rakendamise ajakava
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtests
enaarium Eesmärk Nõuded Aasta
M6C1–1
Reform 1:
Territoriaalse
tervishoiu
abivõrgustiku uue
organisatsioonilise
mudeli
määratlemine
Eesmärk
Tervishoiu
korralduse
reformi
käsitlevate
teiseste
õigusaktide
(ministri
dekreet)
jõustumine.
Seaduse säte,
mis viitab
õigusakti
jõustumisele
PUUDUV
AD
PUUDUV
AD
PUUDUV
AD 2. kv 2022
Teiseste õigusaktide (ministri dekreet)
jõustumine, millega nähakse ette:
– Määratleda territoriaalse tervishoiuabi
võrgustiku uus organisatsiooniline mudel,
määratledes õigusraamistiku, milles
määratakse kindlaks struktuurilised,
tehnoloogilised ja organisatsioonilised
standardid kõigis piirkondades; tervise,
keskkonna ja kliimaga seotud
ennetustegevuse uue institutsioonilise
struktuuri määratlemine vastavalt
terviseühtsuse põhimõttele.
M6C1–2
Investeering 1.1:
Kogukonna
tervisemajad
territoriaalse
tervishoiuabi
parandamiseks
Eesmärk
Institutsioonilise
arengu lepingu
heakskiitmine
Tervishoiu- ja
regioonide
ministeeriumi
teade
heakskiitmise
kohta
PUUDUV
AD
PUUDUV
AD
PUUDUV
AD 2. kv 2022
Institutsioonilise arengu lepingu (Contratto
Istituzionale di Sviluppo) heakskiitmine, mille
puhul vastutav ja rakendav asutus on Itaalia
tervishoiuministeerium ning milles osalevad
piirkondlikud haldusasutused koos teiste
ühenduse tervishoiuasutuste asjaomaste
üksustega:
Institutsioonilise arengu leping on
juhtimisvahend, milles loetletakse kõik sobivad
isikud, kes on kindlaks määratud ühenduse
tervisemaja rakendamiseks, et parandada
territoriaalset tervishoiuabi. Lepingus
määratakse kindlaks ka kohustused, mida iga
397
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtests
enaarium Eesmärk Nõuded Aasta
Itaalia piirkond võtab, et tagada kogukonna
tervisemajaga seotud oodatavate tulemuste
saavutamine.
Lepingu eesmärk oli toetada territoriaalset
ühtekuuluvust, arengut ja majanduskasvu ning
kiirendada keerukate sekkumiste rakendamist.
Institutsioonilise arengu leping on eriti kasulik
suurprojektide või investeeringute puhul, mis
on seotud omavahel funktsionaalselt seotud
individuaalsete sekkumistega, mis nõuavad
integreeritud lähenemisviisi ning Euroopa
investeeringute struktuurifondide ja riiklike
fondide kasutamist, mis sisalduvad ka riiklikest
ja Euroopa vahenditest rahastatavates
kavades ja rakenduskavades.
M6C1–3
Investeering 1.1:
Kogukonna
tervisemajad
territoriaalse
tervishoiuabi
parandamiseks
Siht
Aktiveeritakse
kogukonna
tervisemajade
teenused
PUUDUVAD Number 0 1 038 2. kv 2026
Sõltumatute ekspertide aruanded, mis
kinnitavad teenuste aktiveerimist vastavalt DM
23. mai 2022. aasta otsuse nr 77 I lisa 5. jao
tabeli 4 kohustuslikes punktides määratletud
standarditele vähemalt 1038 kogukonna
tervishoiuasutuses.
Vähemalt 40 % taaste- ja vastupidavusrahastu
investeerimiskulude toetusest eraldatakse
määruse (EL) 2021/241 VI lisa joonealuse
märkuse 5 nõuetele vastavate uute hoonete
ehitamiseks (sekkumisvaldkond 025b) või
hoonete energiatõhusaks renoveerimiseks
398
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtests
enaarium Eesmärk Nõuded Aasta
(sekkumisvaldkond 026), mille on kinnitanud
sõltumatu ekspert.
M6C1–4 Investeering 1.2:
Kodu kui esimene
hoolduskoht ja
telemeditsiin
Eesmärk Koduhoolduse
rakendamise
digitaalset
mudelit
sisaldavate
suuniste
heakskiitmine
Tervishoiuminis
teeriumi
heakskiidetud
suunised
PUUDUV
AD
PUUDUV
AD
PUUDUV
AD
2. kv 2022 Suunistega ühtlustatakse protsesse, mis on
vajalikud koduhoolduse tõhustamiseks
kaugseiremeetodite ja koduautomaatika
arendamise kaudu.
M6C1–5
Investeering 1.2:
Kodu kui esimene
hoolduskoht ja
telemeditsiin
Eesmärk
Tervishoiuminist
eeriumi ja
regioonide poolt
heaks kiidetud
institutsioonilise
arengu leping
Teade
heakskiidetud
lepingu kohta
PUUDUV
AD
PUUDUV
AD
PUUDUV
AD 2. kv 2022
Institutsioonilise arengu lepingu (Contratto
Istituzionale di Sviluppo) heakskiitmine,
kusjuures vastutav ja rakendav asutus on
Itaalia tervishoiuministeerium ning selles
osalevad piirkondlikud haldusasutused koos
teiste koduhooldusega seotud üksustega.
Institutsioonilise arengu lepingus määratakse
iga sekkumise või sekkumiskategooria jaoks
kindlaks ajakava, töövõtjate kohustused,
hindamis- ja järelevalvekriteeriumid ning
sanktsioonid mis tahes mittevastavuse korral.
Samuti määratakse selles kooskõlas
subsidiaarsuse põhimõttega kindlaks
sekkumiste rahastamise võimaliku osalise
lõpetamise või asjakohaste vahendite
eraldamise tingimused teisele
valitsustasandile.
399
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtests
enaarium Eesmärk Nõuded Aasta
M6C1–6
Investeering 1.2:
Kodu kui esimene
hoolduskoht ja
telemeditsiin
Siht Koduhooldus PUUDUVAD Number 645 590 1 487 590 2. kv 2025
Üle 65-aastastele inimestele
koduhooldusteenuste osutamise aastane
väärtus peab olema vähemalt 1 487 590,
mõõdetuna näitajaga SIAD05bis – „Üle 65-
aastaste puue SIADis (Sistema informativo
Assistenza domiciliare) seoses eakate
elanikkonnaga“ Agenase töölaual.
M6C1–7
Investeering 1.2:
Kodu kui esimene
hoolduskoht ja
telemeditsiin
Siht
Täielikult
toimivad
koordineerimisk
eskused (teine
pakett)
PUUDUVAD Number 0 480 4. kv 2024
Selle sekkumise oluline punkt on vähemalt 480
territoriaalse koordineerimiskeskuse (Centrali
Operative Territoriali) tööleasumine, mille
ülesanne on koordineerida ja ühendada
erinevaid territoriaalseid, sotsiaal- ja
tervishoiuteenuseid ning haiglate
tervishoiuteenuseid, samuti erakorralise
meditsiini võrgustikku, et tagada ravi
järjepidevus, kättesaadavus ja integreerimine.
M6C1–8
Investeering 1.2:
Kodu kui esimene
hoolduskoht ja
telemeditsiin
Siht
Vähemalt üks
telemeditsiini
projekt
määratakse
igale piirkonnale
(võttes arvesse
nii konkreetses
piirkonnas
rakendatavaid
projekte kui ka
projekte, mida
PUUDUVAD Number 0 20 4. kv 2023
Riikliku telemeditsiini strateegiaga
edendatakse ja rahastatakse uute
telemeditsiini projektide ja lahenduste
väljatöötamist ja laiendamist piirkondlikes
tervishoiusüsteemides ning seega on see
peamine (tehnoloogiline) võimaldaja
tõhustatud kaughoolduse lähenemisviisi
rakendamiseks tervishoius, pöörates erilist
tähelepanu kroonilistele patsientidele.
400
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtests
enaarium Eesmärk Nõuded Aasta
võidakse
arendada
piirkondadevah
eliste
konsortsiumide
osana)
M6C1–9
Investeering 1.2:
Kodu kui esimene
hoolduskoht ja
telemeditsiin
Siht
Abi
telemeditsiini
vahendite abil
PUUDUVAD Number 0 300 000 2. kv 2026
Telemeditsiini vahendite abil antava abi
näitaja, mis põhineb riikliku telemeditsiini
platvormi (PNT) näitajatel ja mida jälgitakse
Agenase tulemustabeli kaudu, peab jõudma
väärtuseni, mis on vähemalt 300 000 inimest.
M6C1–10
Investeering 1.3:
Tugevdada
vahetasandi
tervishoidu ja selle
rajatisi
(kogukonnahaiglad)
Eesmärk
Institutsioonilise
arengu lepingu
(Contratto
Istituzionale di
Sviluppo)
heakskiitmine
Teatis
institutsioonilis
e arengu
lepingu
heakskiitmise
kohta
PUUDUV
AD
PUUDUV
AD
PUUDUV
AD 2. kv 2022
Institutsioonilise arengu lepingu (Contratto
Istituzionale di Sviluppo) heakskiitmine,
kusjuures vastutav ja rakendav asutus on
Itaalia tervishoiuministeerium ning selles
osalevad piirkondlikud haldusasutused koos
teiste ühenduse haiglatega seotud üksustega.
Institutsioonilise arengu lepingus loetletakse
kõik investeeringuteks sobivad alad ning
kohustused, mida iga piirkond võtab
kavandatud tulemuse saavutamise
tagamiseks. Mis tahes piirkonna rikkumise
korral pöördub tervishoiuministeerium voliniku
poole „ad acta“. Rajatiste tehnoloogiapargi, st
kõigi vahendite, litsentside ja omavaheliste
ühenduste puhul eelistatakse hankemeetodite
401
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/si
ht Nimetus
Kvalitatiivsed
näitajad (vahe-
eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtests
enaarium Eesmärk Nõuded Aasta
koondamist.
M6C1–11
Investeering 1.3:
Tugevdada
vahetasandi
tervishoidu ja selle
rajatisi
(kogukonnahaiglad)
Siht
Kogukonnahaigl
ate teenused on
aktiveeritud
PUUDUVAD Number 0 307 2. kv 2026
Sõltumatute ekspertide aruanded, mis
kinnitavad teenuste aktiveerimist vastavalt 23.
mai 2022. aasta korralduse nr 77 1. lisa
punktis 11 määratletud standarditele vähemalt
307 kogukonnahaiglas.
402
P. MISSIOON 6 KOMPONENT 2: Riiklike tervishoiuteenuste innovatsioon,
teadusuuringud ja digitaliseerimine
Itaalia taaste- ja vastupidavuskava selle komponendi eesmärk on tagada vajalikud eeltingimused riikliku
tervishoiuteenuse suurema vastupanuvõime tagamiseks järgmise kaudu: i) aegunud tervishoiutehnoloogiate
asendamine haiglates; ii) haiglahoonete ohutuse oluline struktuurne parandamine; iii) tervise infosüsteemide
ja digivahendite täiustamine; iv) teadusuuringute sektori edendamine ja tugevdamine; v) inimressursside
suurendamine.
Selle komponendi raames tehtavad investeeringud ja reformid aitavad täita 2020. ja 2019. aastal Itaaliale
esitatud riigipõhiseid soovitusi vajaduse kohta „tugevdada tervishoiusüsteemi vastupanuvõimet ja suutlikkust
tervishoiutöötajate, elutähtsate meditsiinitoodete ja -taristu valdkonnas“ (riigipõhine soovitus 1, 2020),
„keskenduda investeeringutele rohe- ja digipöördesse, eelkõige [...] tugevdatud digitaristusse, et tagada
elutähtsate teenuste osutamine“ (riigipõhine soovitus 3, 2020), ning „keskenduda investeeringutega seotud
majanduspoliitikas teadusuuringutele ja innovatsioonile ning taristu kvaliteedile, võttes arvesse ka
piirkondlikke erinevusi“ (riigipõhine soovitus 3, 2019).
P.1. Tagastamatu rahalise toetusega seotud reformide ja investeeringute kirjeldus
Reform 1: Vaadata läbi ja ajakohastada haiglaravi ja hooldust käsitlevate teadusinstituutide (IRCCS)
praegune õigusraamistik
Reformi eesmärk on korraldada ümber haiglaravi ja hoolduse teadusinstituutide võrgustik (IRCCS), et i)
parandada riikliku tervishoiusüsteemi kvaliteeti, ii) parandada tervishoiu ja teadusuuringute vahelist seost
ning iii) vaadata läbi IRCCSi õiguskord ja Itaalia tervishoiuministeeriumi pädevusse kuuluv teaduspoliitika.
Reformiga parandatakse riiklike IRCCSide juhtimist, i) tõhustades strateegilist juhtimist, ii) määratledes
paremini volitused ja pädevusvaldkonnad ning iii) määratledes põhjalikult eeskirjad riiklike IRCCSide
teadusdirektori ja teadustöötajate staatuse kohta.
Lõpuks konkreetne alameede, millega eristatakse IRCCS-e nende tegevuse alusel (üks spetsialist või
üldspetsialist), luuakse IRCCS-ide integreeritud võrgustik ning hõlbustatakse oskusteabe vahetamist IRCCS-
ide endi ja Itaalia NHS-i muude struktuuride vahel.
Investeering 2.1: NHSi biomeditsiiniliste uuringute tugevdamine ja tõhustamine
Meetme eesmärk on suurendada biomeditsiiniliste uuringute süsteemi rahastamist.
Investeering hõlmab kontseptsiooni tõestamise projektide toetamist ning teadusalgatuste rahastamist
haruldaste haiguste, haruldaste vähivormide ja muude tervisele suurt mõju avaldavate haiguste valdkonnas.
Investeering 2.2: Tervishoiusüsteemi spetsialistide tehniliste, kutsealaste, digi- ja juhtimisoskuste
arendamine
Selle meetme eesmärk on suurendada investeeringuid tervishoiusüsteemiga seotud koolitusse ja oskustesse.
See investeering seisneb stipendiumide suurendamises üldmeditsiini erikursuse jaoks; sõlmitud eriarsti
koolituslepingute arvu suurendamine; koolitused NHS-i töötajate juhtimis- või digioskuste kohta ning
koolitused NHS-i töötajate ohutuse kohta seoses haiglanakkustega.
403
P.2. Tagastamatu rahalise toetuse eesmärgid, sihid, näitajad ning seire ja rakendamise ajakava
Järjekorra-
number
Seotud meede (reform või
investeering) Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium
Eesmär
k
Nõude
d Aasta
M6C2–1
Reform 1: Vaadata läbi ja
ajakohastada haiglaravi ja
hoolduse teadusinstituutide
(IRCCS) praegune
õigusraamistik ning
tervishoiuministeeriumi
teaduspoliitika, et
tugevdada teadusuuringute,
innovatsiooni ja tervishoiu
vahelist seost
Eesmärk
Haiglaravi ja
hoolduse
teadusinstituute
(IRCSS)
reguleerivate
eeskirjade
ümberkorraldamist
käsitleva
seadusandliku
dekreedi jõustumine
Määruse säte
jõustumise kohta
PUUDUV
AD
PUUDUVA
D
PUUDU
VAD 4. kv 2022
Reformiga korraldatakse ümber
IRCCSi võrgustik, et parandada NHSi
kvaliteeti ja tipptaset, parandades
tervishoiu ja teadusuuringute vahelisi
suhteid, vaadates läbi IRCCSi
õiguskorra ja Itaalia
tervishoiuministeeriumi pädevusse
kuuluva teaduspoliitika.
Reform hõlmab meetmeid, mille
eesmärk on: i) tugevdada
teadusuuringute, innovatsiooni ja
tervishoiu vahelist seost; ii)
parandada riiklike IRCCSide juhtimist,
tõhustades strateegilist juhtimist ning
määratledes paremini volitused ja
pädevusvaldkonnad.
M6C2–2
Investeering 2.1: NHSi
biomeditsiiniliste uuringute
tugevdamine ja
tõhustamine
Siht
Kontseptsiooni
tõestamise ning
harvaesinevate
vähivormide ja
haiguste valdkonnas
rahastatud
teadusprojektid
PUUDUVAD Number 0 200 2. kv 2025
Haruldaste haiguste ja
harvaesinevate vähivormide
valdkonna teadusprojektidele
rahaliste vahendite eraldamine ja
kontseptsiooni tõestamine. Programmi „PoC“ ning harvikhaigusi
ja haruldasi vähivorme käsitlevate
teadusprojektide rahastamine toimub
avaliku pakkumismenetluse kaudu.
404
Järjekorra-
number
Seotud meede (reform või
investeering) Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium
Eesmär
k
Nõude
d Aasta
Esimese osamakse on saanud
vähemalt 200 teadusprojekti.
M6C2–3
Investeering 2.1: NHSi
biomeditsiiniliste uuringute
tugevdamine ja
tõhustamine
Siht
Suure tervisemõjuga
haigustega seotud
teadusprojektid
PUUDUVAD Number 0 324 2. kv 2025
Rahaliste vahendite eraldamine
tervist oluliselt mõjutavate haigustega
seotud teadusprojektidele. Suure tervisemõjuga haigusi
käsitlevate teadusprojektide
rahastamine toimub avaliku
pakkumismenetluse kaudu.
Vähemalt 324 teadusprojekti on
saanud esimese osamakse.
M6C2–16
Investeering 2.2:
Tervishoiusüsteemi
spetsialistide tehniliste,
kutsealaste, digi- ja
juhtimisoskuste arendamine
Siht
Riikliku
tervishoiuteenistuse
töötajate juhtimis- ja
digioskuste
koolitused ning
haiglanakkuste
ohutuse alased
koolitused
PUUDUVAD Number 0 4 500 2. kv 2026
Tõendid riikliku tervishoiuteenistuse
4 500 töötaja osalemise kohta
juhtimis- või digioskuste alastel
koolitustel.
Avaldatakse nimekiri vähemalt
290 000 riikliku tervishoiuteenistuse
töötajast, kes on registreerunud
haiglanakkuste ohutuse alasele
koolitusele.
M6C2–17
Investeering 2.2:
Tervishoiusüsteemi
spetsialistide tehniliste,
kutsealaste, digi- ja
Siht
Eriarstide
koolituslepingute
sõlmimine
PUUDUVAD Number 0 4 200 4. kv 2025 4 200 eriarstikoolituse lepingu
sõlmimine.
405
Järjekorra-
number
Seotud meede (reform või
investeering) Eesmärk/siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium
Eesmär
k
Nõude
d Aasta
juhtimisoskuste arendamine
406
P.3. Laenuga seotud reformide ja investeeringute kirjeldus
Investeering 1.1: Haiglate tehnoloogiliste seadmete digitaalne ajakohastamine
Meetme eesmärk on suurendada tervishoiutöötajate tootlikkust, parandada protsesside kvaliteeti, tagada
patsientide ohutus ja kvaliteetsete teenuste osutamine.
Investeering hõlmab tervishoiuseadmete ajakohastamist, haiglate protsesside informeerimist koos esimese ja
teise tasandi erakorralise meditsiini osakonnaga (Dipartimenti Emergenza e Accettazione, DEA) ning
voodikohtade pakkumist või ümberehitamist intensiivraviüksustes ja poolintensiivset ravi riiklikes
tervishoiuasutuste haiglates.
Investeering 1.2: Ohutu ja jätkusuutliku haigla suunas
Meetme eesmärk on suurendada haiglate ohutust või ajakohastada tervishoiuasutusi. Meede hõlmab
antisemitismivastaseid sekkumisi või seaduse 67/88 artikli 20 kohaseid sekkumisi tervishoiuasutustes.
Investeering 1.3: Tehnoloogilise taristu ning andmekogumise, andmetöötluse, -analüüsi ja -
simulatsiooni vahendite tugevdamine
Meetme eesmärk on parandada Itaalia riikliku tervishoiusüsteemi tervishoiuteenuste osutamist,
tervishoiuanalüüsi ja prognoosivõimet. Investeering seisneb olemasolevate digitaalsete terviselugude
kasutamise suurendamises ning tervishoiuministeeriumi tehnoloogilise ja analüüsitaristu tugevdamises.
Investeering 2.2: Tervishoiusüsteemi spetsialistide tehniliste, kutsealaste, digi- ja juhtimisoskuste
arendamine
Selle meetme eesmärk on suurendada investeeringuid tervishoiusüsteemiga seotud koolitusse ja oskustesse.
See investeering seisneb stipendiumide suurendamises üldmeditsiini erikursuse jaoks; sõlmitud eriarsti
koolituslepingute arvu suurendamine; koolitused NHS-i töötajate juhtimis- või digioskuste kohta ning
koolitused NHS-i töötajate ohutuse kohta seoses haiglanakkustega.
407
P.4. Laenu eesmärgid, sihid, näitajad ning seire ja rakendamise ajakava
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/
siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
M6C2–4
Investeering 1.1:
Haiglate
tehnoloogiliste
seadmete
digitaalne
ajakohastamine
Eesmärk
Reorganiseerimise
kava on heaks
kiitnud
tervishoiuministeeri
um/Itaalia
piirkonnad
Heakskiitmisest
teatamine PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2021
Reorganiseerimise kava heakskiitmine, et
tugevdada NHS-i haiglate suutlikkust
pandeemiaga seotud hädaolukordadele
asjakohaselt reageerida, suurendades
voodikohtade arvu intensiivravi- ja
allintensiivraviüksustes.
Haigla reorganiseerimise kavaga
suurendatakse voodikohtade arvu NHS-i
haiglate intensiiv- ja poolintensiivravi
üksustes.
M6C2–5
Investeering 1.1:
Haiglate
tehnoloogiliste
seadmete
digitaalne
ajakohastamine
Eesmärk
Institutsioonilise
arengu lepingu
heakskiitmine
Tervishoiuministeeri
umi ja Itaalia
regioonide
ministeeriumi teade
institutsioonilise
arengu lepingu
allkirjastamise kohta
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2022
Institutsioonilise arengu lepingu (Contratto
Istituzionale di Sviluppo) heakskiitmine,
kusjuures vastutav ja rakendav asutus on
Itaalia tervishoiuministeerium ning selles
osalevad piirkondlikud haldusasutused ja
muud peamised sidusrühmad.
Institutsioonilise arengu leping on vahend,
mis on kindlaks määratud kehtivates
riigisisestes õigusaktides (31. mai 2011.
aasta seadusandliku dekreedi nr 88 artiklid 1
ja 6 koosmõjus 20. juuni 2017. aasta
seadusandliku dekreedi nr 91 artikliga 7 3.
augusti 2017. aasta seadusega nr 123), et
kiirendada omavahel funktsionaalselt seotud
408
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/
siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
strateegiliste projektide rakendamist.
Institutsioonilise arengu lepingus loetletakse
kõik sobivad investeerimisobjektid ning
kohustused, mida iga piirkond võtab
oodatava tulemuse saavutamise
tagamiseks. Mis tahes piirkonna rikkumise
korral pöördub tervishoiuministeerium
voliniku poole „ad acta“.
M6C2–6
Investeering 1.1:
Haiglate
tehnoloogiliste
seadmete
digitaalne
ajakohastamine
Siht
Tõend 3100
diagnostikaseadme
kohaletoimetamise
või katsetamise
kohta
PUUDUVAD Number 0 3 100 2. kv 2026
Tõend 3 100 diagnostikaseadme
kohaletoimetamise või katsetamise kohta
(mis võib muu hulgas hõlmata Verbale di
Collaudot, testimistõendeid ja kasutusloa
sertifikaate). Vähemalt 290 kirjet peavad
kuuluma järgmistesse kategooriatesse:
NMR – tuumamagnetresonants – 1,5 T või
rohkem või lineaarkiirendid või PET/CT –
positronemissioontomograafia/arvutitomogra
afia.
Ülejäänud diagnostikaseadmete hulka
võivad muu hulgas kuuluda ultraheli-,
mammograafia- ja
kompuutertomograafiaseadmed.
M6C2–7 Investeering 1.1:
Haiglate
tehnoloogiliste
Eesmärk
Kõigi
riigihankelepingute
sõlmimine
Kõikidest sõlmitud
riigihankelepingutes
t teatamine.
PUUDUVAD PUUDUVAD PUUDUVAD 4. kv 2022 Hankemenetluste avaldamine (Consipi
raamleping) ja teenuseosutajatega lepingute
sõlmimine ning DEA I ja II taseme haiglate
409
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/
siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
seadmete
digitaalne
ajakohastamine
digiteerimine
Lepingud hõlmavad järgmiste toodete
ostmist: a) Andmetöötluskeskus, sealhulgas
info- ja kommunikatsioonitehnoloogia ning
kõik sellega seotud tööd, mis on vajalikud
kogu haigla struktuuri arvutiseerimiseks; b)
riistvara ja/või tarkvara soetamine,
infotehnoloogia, elektromeditsiinilised
tehnoloogiad, samuti lisatehnoloogiad ja
kõik sellega seotud tööd, mis on vajalikud
haigla osakondade arvutiseerimiseks.
Praeguse digiteerimistaseme hindamine,
mis eelneb sekkumise rakendamisele,
võimaldab seda hindamist viimistleda
vastavalt iga piirkonna/haigla tegelikele
vajadustele.
M6C2–8
Investeering 1.1:
Haiglate
tehnoloogiliste
seadmete
digitaalne
ajakohastamine
Siht
Haiglad
digiteeritakse (DEA
– Hädaabi- ja
vastuvõtuosakonna
d – I ja II aste)
PUUDUVAD Number 0 280 4. kv 2025
Eesmärk saavutatakse, kui 280 esimese ja
teise tasandi hädaolukorra ja vastuvõtu
osakonna digiteerimist on suurendatud
vähemalt ühe astme võrra vastavalt
elektrooniliste terviseandmete vastuvõtmise
mudelile (EMRAM), mida tõendab tervishoiu
teabe- ja juhtimissüsteemide ühingu
(HIMSS) digitaalse küpsuse tunnistus ja mis
jõuab vähemalt 50 otsese elektroonilise
juurdepääsu puhul küpsusastmete skaala
410
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/
siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
teise või enamasse etappi.
Selle eesmärgi saavutamiseks võib arvesse
võtta muid hankeid kui need, mis on tehtud
M6C2–7 saavutamiseks sõlmitud lepingute
alusel, samuti hankeid, mis on tehtud
avaliku halduse elektroonilisel turul (Mepa)
või avaliku halduse dünaamilises
hankesüsteemis (SDAPA).
M6C2–9
Investeering 1.1:
Haiglate
tehnoloogiliste
seadmete
digitaalne
ajakohastamine
Siht
Intensiivravis ja
poolintensiivses
hoolduses
pakutavad või
teisendatud
voodikohad
PUUDUVAD Number 0 5 922 2. kv 2026
Haldustõendid, mis tõendavad sekkumiste
lõpuleviimist, et tagada vähemalt 5 922
voodikoha pakkumine või ümberehitamine
intensiivraviüksustes ja poolintensiivravis.
Intensiivravi voodikohtade arv peab olema
vähemalt 2 368.
M6C2–10
Investeering 1.2:
Ohutu ja
jätkusuutliku
haigla suunas
Siht
Antiseismiline
sekkumine
haiglates on lõpule
viidud
PUUDUVAD Number 0 84 2. kv 2026
Haiglarajatistes vähemalt 84 antiseismilise
sekkumise korral väljastatud aruanne
valminud struktuuri- või staatilise testi kohta.
M6C2–10a
Investeering 1.2:
Ohutu ja
jätkusuutliku
haigla suunas
Siht
Seaduse 67/88
artikli 20 kohaste
sekkumistega
seotud toetus(ed)
PUUDUVAD Number 0 225 000 000 2. kv 2026
Tõend(id) 225 000 000 euro suuruse(te)
makse(te) kohta seaduse 67/88 artikli 20
kohaste sekkumiste puhul.
M6C2–11 Investeering 1.3: Siht Üldarstid, kes PUUDUVAD Protsent 0 85 4. kv 2025 Üldarstid (MMG/PLS), kes kasutavad
411
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/
siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
Tehnoloogilise
taristu ning
andmekogumise,
andmetöötluse, -
analüüsi ja -
simulatsiooni
vahendite
tugevdamine
sisestavad
digitaalseid
terviselugusid.
elektroonilisi terviselugusid, mis
moodustavad vähemalt 85 % kõigist
terviselugudest. Eesmärk saavutatakse,
kontrollides tervisevaldkonna infosüsteemi
seirepaneelil 8. augusti 2022. aasta
dekreedi 2. lisas ja selle muudatustes
osutatud näitaja 2 väärtust riigi tasandil.
M6C2–12
Investeering 1.3:
Tehnoloogilise
taristu ning
andmekogumise,
andmetöötluse, -
analüüsi ja -
simulatsiooni
vahendite
tugevdamine
Eesmärk
Ravikindlustuskaar
disüsteemi,
elektroonilise
terviseloo
koostalitlusvõime
taristu ja
„Ecosistema Dati
Sanitari“
komponentide
katsetamine
Haldustõendid, mis
kinnitavad
ravikindlustuskaardi
süsteemi
komponentide,
digitaalse terviseloo
koostalitlusvõime
taristu ja
„Ecosistema Dati
Sanitari“
katsetamist.
PUUDUVAD PUUDUVAD PUUDUVAD 2. kv 2026
Haldussertifikaadid, mis kinnitavad järgmiste
testide tegemist:
i) ravikindlustuskaardi süsteemi
komponendid, sealhulgas e-
retseptide protsessi
ümberkujundamine;
ii) digitaalse terviseloo
koostalitlusvõime taristu
komponendid, sealhulgas riiklik
patsientide töölaud, digitaalse
terviseloo töölaud (allpiirkondade
puhul); ja
iii) „Ecosistema Dati Sanitari“ (EDS)
komponendid, sealhulgas
andmemoodul, EDS-maakler ja
lüüs.
M6C2–13 Investeering 1.3: Siht Digitaalset PUUDUVAD Protsent 0 90 2. kv 2026 Kohalike digitaalsete tervise infosüsteemide
412
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk/
siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestsen
aarium Eesmärk Nõuded Aasta
Tehnoloogilise
taristu ning
andmekogumise,
andmetöötluse, -
analüüsi ja -
simulatsiooni
vahendite
tugevdamine
terviselugu
kasutatakse
enamiku
terviselugude
puhul
dokumentide osakaal kõigist dokumentidest
peab olema 90 %. Eesmärk saavutatakse,
kontrollides tervisevaldkonna infosüsteemi
seirepaneelil 8. augusti 2022. aasta
dekreedi 2. lisas osutatud näitaja 1 väärtust
riigi tasandil ja selle muudatusi vähemalt
seoses järgmiste dokumentidega: Haiglast
väljakirjutamise kiri; erakorralise meditsiini
osakonna aruanne; laboriaruanne;
radioloogiaaruanne; patoloogilise anatoomia
aruanne.
M6C2–14
Investeering 2.2:
Tervishoiusüstee
mi spetsialistide
tehniliste,
kutsealaste, digi-
ja juhtimisoskuste
arendamine
Siht
Antakse
stipendiume
üldarsti
erikoolituseks.
PUUDUVAD Number 0 1 800 2. kv 2023
Selle investeeringuga suurendatakse
stipendiume üldmeditsiini erikursuse jaoks,
tagades kolme kolmeaastase koolitustsükli
läbimise.
M6C2–15
Investeering 2.2:
Tervishoiusüstee
mi spetsialistide
tehniliste,
kutsealaste, digi-
ja juhtimisoskuste
arendamine
Siht
Antakse
täiendavaid
stipendiume
üldarsti
erikoolituseks.
PUUDUVAD Number 1 800 2 700 2. kv 2024
Selle investeeringuga suurendatakse
stipendiume üldmeditsiini erikursuse jaoks,
tagades kolme kolmeaastase koolitustsükli
läbimise.
413
KÜSIMUS 7. Kava „REPowerEU“
REPowerEU peatüki eesmärk on tugevdada jaotus-, ülekande- ja jaotusvõrke, sealhulgas gaasiga
seotud võrke; taastuvenergia tootmise kiirendamine, energianõudluse vähendamine, energiatõhususe
suurendamine ning rohepöördeks vajalike oskuste loomine avalikus ja erasektoris; taastuvenergia ja
vesiniku väärtusahelate edendamine krediidile ja maksukrediidile juurdepääsu hõlbustavate meetmete
kaudu.
Komponendis käsitletakse 2022. ja 2023. aastal Itaaliale esitatud riigipõhiseid soovitusi. Eelkõige on
selle eesmärk kiirendada täiendava taastuvenergiavõimsuse kasutuselevõttu, investeerides suurtesse
elektriühenduste projektidesse (nimelt kahte Sardiiniat ja Sitsiiliat mandriga ühendavasse
võrkudevahelisse ühendusse), ajakohastades riiklikku ülekandevõrku ja lihtsustades loamenetlusi. See
aitab suurendada gaasi riigisisese ülekande võimsust, et ületada kitsaskohad, mitmekesistada
energiaimporti ja tugevdada varustuskindlust. Sellega edendatakse säästvat liikuvust, vähendades
keskkonnakahjulikke toetusi ja tugevdades raudteeparki. See aitab vähendada sõltuvust
fossiilkütustest, elektrifitseerides kodumajapidamiste tarbimist ja suurendades võrgu
vastupanuvõimet. See aitab suurendada energiatõhusust elamu- ja ettevõtlussektoris, sealhulgas
sihipäraste stimuleerimiskavade ja rahastamisvahendite kaudu. Lisaks hõlmab see reforme ja
investeeringuid, et parandada rohepöördeks vajalike oskuste pakkumist ja omandamist nii era- kui ka
avalikus sektoris.
Üheksal projektil on piiriülene mõõde. Kahel neist on otsene piiriülene mõju: 1) investeering, mis
aitab ehitada elektriühendust Sardiinia, Korsika ja Toscana vahel; 2) investeering kompressorjaama,
mis suurendab gaasi eksporti Kesk-Euroopasse. Muud projektid toovad kaudset kasu piiriülestele
liikmesriikidele, kõrvaldades riigisisese energiaülekande ja -jaotuse kitsaskohad ning suurendades
võrgu tõhusust ja vastupidavust.
Eeldatakse, et ükski selle komponendi meede ei kahjusta oluliselt keskkonnaeesmärke määruse (EL)
2020/852 artikli 17 tähenduses, võttes arvesse taaste- ja vastupidavuskavas sätestatud meetmete ja
leevendusmeetmete kirjeldust kooskõlas põhimõtte „ei kahjusta oluliselt“ tehniliste suunistega ( C
(2023) 6454 final), samas kui olulise kahju ärahoidmise põhimõtet ei kohaldata investeeringu 13 –
Aadria mere torujuhtme 1. etapi (Sulmona kompressorjaam ja Sestino-Minerbio gaasijuhe) ja
investeeringu 14 – piiriülese gaasiekspordi taristu suhtes vastavalt määruse (EL) 2021/241 artikli 21c
lõikele 6.
KÜSIMUS 1. Tagastamatu rahalise toetusega seotud reformide ja
investeeringute kirjeldus
Reform 1. Taastuvenergia loamenetluste lihtsustamine kesk- ja kohalikul tasandil
Reformi eesmärk on konsolideerida ja ühtlustada kehtivaid õigusakte ja sätteid, mis reguleerivad
taastuvate energiaallikate lubamist. Reform seisneb õigusakti (tuntud ka kui Testo Unico)
vastuvõtmises ja jõustumises, millega kogutakse, koostatakse ja konsolideeritakse taastuvate
energiaallikate lubamist reguleerivad normid ning asendatakse varasemad selleteemalised õigusaktid.
Reformi eesmärk on ka kehtestada õigusraamistik „taastuvenergia eelisarendusalade“
kindlakstegemiseks ja luua digiplatvorm, mis võimaldab esitada ja/või koguda (kui see võetakse
kasutusele muude platvormide kaudu) riiklikul ja piirkondlikul tasandil loataotlusi
taastuvenergiajaamade paigaldamiseks ning esitada teatise Edilizia Libera alusel paigaldatud jaamade
kohta.
Reform 2. Keskkonnakahjulike toetuste vähendamine
Reformi eesmärk on vähendada keskkonnakahjulikke subsiidiume, tuginedes MASE avaldatud 2022.
aasta keskkonnakahjulike subsiidiumide kataloogile. Reform seisneb sidusrühmadega konsulteerimise
aruande ja õigusaktide vastuvõtmises.
414
Reform 3. Biometaani gaasivõrguga liitumise kulude vähendamine
Reformi eesmärk on hõlbustada biometaani lisamist energiasüsteemi ja energiaturule ning luua uus
kestliku biometaani tootmisvõimsus kooskõlas direktiiviga (EL) 2018/2001 (taastuvenergia direktiiv)
ja selle delegeeritud õigusaktidega ning eelkõige soodustada maagaasivõrgu paindlikkust ja tõhusust,
hõlbustades üleminekut biometaanile. Reform seisneb õigusaktide jõustumises, et vähendada kestlike
biometaanitehaste ühenduskulusid ja soodustada investeeringuid, mis on suunatud kestliku biometaani
kasutuselevõtule maagaasivõrkudes.
Reform 4. Taastuvelektri ostulepingutega seotud finantsriskide maandamine
Reformi eesmärk on luua tagatiste süsteem, mis maandab vähemalt kolmeaastase kestusega
taastuvenergia ostulepingutega seotud finantsriski.
Reformiga:
i) nõuda, et iga ettevõtja tagaks elektriostulepingute vastuväärtuse osalise katmise
elektriturul pakutavate tagatisvahenditega;
ii) kehtestada meetmed kohustuste täitmata jätmise riski maandamiseks, sealhulgas nõuded
ja piirangud pakkujale ning regulatiivsed karistused tootja kohustuste täitmata jätmise
korral;
iii) teha kindlaks institutsionaalne üksus, kes võtab üle viimasena vastutava müüja/ostja rolli,
kes võtab maksejõuetult vastaspoolelt üle ja tagab tema suhtes võetud kohustuste täitmise.
Reform 5. Uute oskuste kava – Üleminek
Reformi eesmärk on viia koolitusprogrammid paremini kooskõlla tööturu vajadustega, et võidelda
oskuste nõudlusele mittevastavuse vastu, pöörates erilist tähelepanu rohe- ja digioskustele. Reformi
käigus võetakse riiklikul tasandil vastu ja jõustatakse õigusaktid, millega ajakohastatakse uut oskuste
kava („Piano Nuove Competenze – Transizioni“) ja piirkondlikke õigusakte.
Investeering 1. Võimendatud meede: Arukad võrgud
Selle investeeringu eesmärk on digitaliseerida elektrijaotusvõrk, suurendades ülesande 2 komponendi
2 investeeringu 2.1 (arukate võrkude tugevdamine) mahtu. Investeering seisneb toetuste andmises
võrguettevõtjatele, et rahastada sekkumisi, mis vastavad suuremale maksimaalsele elektrikogusele,
mida võrk annab tarbimiseks rohkematele elanikele, kui on juba ette nähtud meetmega M2C2.
Investeering 2. Võimendatud meede: Sekkumised elektrivõrgu vastupidavuse suurendamiseks
Selle investeeringu eesmärk on suurendada ülekande- ja jaotusvõrgu vastupidavust äärmuslikele
ilmastikunähtustele, suurendades ülesande 2 komponendi 2 investeeringut 2.2. Investeering seisneb
võrguettevõtjatele toetuste andmises sekkumisteks, mis vastavad võrgu suuremale vastupidavusele
lisaks sellele, mis on juba ette nähtud meetmega M2C2.
Investeering 3. Võimendatud meede: Vesiniku tootmine mahajäetud tööstusaladel
(vesinikuorud)
Selle investeeringu eesmärk on luua uued vesinikuorud, st taastuvallikatest toodetud vesiniku kohalik
tootmine ja kasutamine tööstuses, VKEdes ja kohalikus transpordis mahajäetud tööstuspiirkondades,
laiendades 2. ülesande 2. komponendi investeeringut 3.1. Laiendamisinvesteering seisneb kahe
täiendava projekti elluviimises vesinikuorgude loomiseks võrreldes nendega, mis on ette nähtud
ülesande 2 komponendi 2 investeeringuga 3.1.
Investeering 4. Türreeni ühendus
Selle investeeringu eesmärk on suurendada Lõuna-Itaalia integreerimist riiklikku ülekandevõrku. See
investeering seisneb Sitsiilia ja Campania vahelise Türreeni ühenduse idapoolse ühendusliini
ehitamises, eelkõige alalisvoolukaabli(te) paigaldamises.
415
Investeering 5. SA.CO.I.3
Selle investeeringu eesmärk on ajakohastada elektrienergia ülekandetaristut, mis ühendab Sardiiniat
Korsika kaudu ülejäänud Itaaliaga, ja suurendada selle integreerimist riiklikku ülekandevõrku. See
investeering seisneb Codrongianose ja Suvereto ümberehitusjaamade kestade (väline taristu)
ehitamises Sardiinia-Korsika-Itaalia 3 ühendusprojekti jaoks.
Investeering 7. Arukas riiklik ülekandevõrk
Selle investeeringu eesmärk on digitaliseerida riiklik ülekandevõrk ning parandada põhivõrguettevõtja
hallatavat juhtimis- ja kontrollisüsteemi. Investeering hõlmab turvaliste protokolli nr 104 ja 5G
seadmete või IKT-arhitektuuri paigaldamist elektrijaamadesse ning elektrimastide seiresüsteemide
paigaldamist.
Investeering 8. Kriitilise tähtsusega toorainete kestlik, ringluspõhine ja turvaline tarnimine
Selle investeeringu eesmärk on toetada kriitilise tähtsusega toorainete taaskasutamist ja ringlussevõttu
ning seeläbi kriitilise tähtsusega toorainete väärtusahelaid ja rohepöördega seotud tehnoloogiaid.
Investeering seisneb kriitilise tähtsusega toorainete tulevaste vajaduste analüüsimises ja ökodisaini
potentsiaali analüüsimises nende nõudluse vähendamiseks ning geograafilise teabe süsteemi platvormi
loomise toetamises, et teha kindlaks ringlussevõetavad materjalid linnakeskkonnas ning jäätmed
mahajäetud või suletud kaevandustes. See hõlmab ka laborite varustamist, et luua linnakaevandamise
ja ökodisaini ühtne keskus.
Investeering 10. Oskuste katseprojekt „Crescere Green“
Selle investeeringu eesmärk on edendada keskkonnahoidlikke kutseoskusi erasektori osalusel. Meede
hõlmab lühikesi koolitusmeetmeid, mis keskenduvad keskkonnahoidlikele oskustele.
Investeering 11. Piirkondliku ühistranspordi raudteepargi tugevdamine heitevabade rongide ja
universaalteenuse abil
Investeeringu eesmärk on vähendada raudteetranspordi kasvuhoonegaaside heidet ja ajakohastada
raudteeparki. See investeering hõlmab vähemalt 79 heiteta reisirongi hankimist.
Investeering 18 – Laiendamismeede: Era- ja väikeste tarbesõidukite pargi elektrisõidukitega
uuendamise programm
Selle investeeringu eesmärk on vähendada maanteetranspordist tulenevat kasvuhoonegaaside ja
õhusaastet linnapiirkondades. See investeering hõlmab heiteta sõidukite ostmist ja diiselsõidukite
lammutamist.
416
KÜSIMUS 2. Tagastamatu rahalise toetuse eesmärgid, sihid, näitajad ning seire ja rakendamise ajakava
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk
/Siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
M7–1
Reform 1:
Taastuvenergia
loamenetluste
lihtsustamine
Eesmärk
Õigusraamistik
„taastuvenergia
eelisarendusalad
e“
kindlakstegemis
eks
Seaduse säte, mis
viitab
taastuvenergia
eelisarendusalade
kindlaksmääramis
e õigusraamistiku
jõustumisele
4. kv 2024
Selliste esmaste õigusaktide jõustumine,
millega kehtestatakse õigusraamistik
„taastuvenergia eelisarendusalade“
kindlakstegemiseks.
Õigusraamistikuga:
1) nõuda taastuvenergia potentsiaali
kaardistamist kogu riigis;
2) määrata kaardistamise põhjal
kindlaks esimesed alad, kehtestades
taastuvenergia eelisarendusalade tulevaseks
kindlaksmääramiseks miinimumkogumi;
3) nõuab, et piirkonnad ja
autonoomsed provintsid määraksid
miinimumpindala põhjal 21. veebruariks 2026
kindlaks taastuvenergia eelisarendusalad;
4) anda keskvalitsusele õigus kasutada
asendusvolitusi, kui piirkonnad või
autonoomsed provintsid ei suuda 21.
veebruariks 2026 taastuvenergia
eelisarendusalasid kindlaks teha;
5) nõuda avamerealade
kindlaksmääramist taastuvenergia
kasutuselevõtuks kooskõlas mereruumi
planeeringutega.
417
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk
/Siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
M7–2
Reform 1:
Taastuvenergia
loamenetluste
lihtsustamine
Eesmärk
Õigusakti (Testo
Unico)
jõustumine
Seaduse säte, mis
viitab õigusakti
jõustumisele
2. kv 2025
Jõustub õigusakt (Testo Unico), millega
kogutakse, koondatakse ja konsolideeritakse
taastuvate energiaallikate lubade andmist
reguleerivad normid ning asendatakse
varasemad selleteemalised õigusaktid.
Testo Unico kehtestab ka lubade andmise
„ülemmäära eeskirjad“, nii et piirkonnad ei saa
rakendada rangemaid eeskirju, kui on
sätestatud siseriiklikes õigusaktides.
M7–3
Reform 1:
Taastuvenergia
loamenetluste
lihtsustamine
Eesmärk
Taastuvenergiag
a seotud lubade
andmise
digiplatvormi
loomine
Taastuvenergiaga
seotud lubade
andmise
digiplatvormi
loomine
2. kv 2026
Digiplatvorm on veebipõhine ning võimaldab
esitada ja/või koguda (kui see võetakse
kasutusele muude platvormide kaudu)
loataotlusi, mis on seotud
taastuvenergiajaamade rajamisega riiklikul ja
piirkondlikul tasandil (Autorizzazione Unica,
Procedura Abilitativa Semplificata), ning
esitada teatist Edilizia Libera alusel
paigaldatud jaamade kohta.
M7–4
Reform 2:
Keskkonnakahjulike
toetuste vähendamine
Eesmärk
Võetakse vastu
valitsuse
aruanne, milles
esitatakse
keskkonnakahjul
ike toetuste
vähendamiseks
sidusrühmadega
peetud valitsuse
konsultatsioonid
Valitsuse aruande
vastuvõtmine 4. kv 2024
Aruandes kirjeldatakse meetmeid, mida on
võetud asjaomaste sidusrühmadega
konsulteerimiseks keskkonnakahjulike
toetuste reformi üle, sealhulgas
sidusrühmadelt saadud teavet.
Konsulteeritavate sidusrühmade hulka
kuuluvad asjaomased avalik-õiguslikud
asutused ja erasektori sidusrühmad.
418
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk
/Siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
e tulemused.
M7–5
Reform 2:
Keskkonnakahjulike
toetuste vähendamine
Eesmärk Õigusakti(de)
jõustumine
Õigusakti(de)
jõustumisele viitav
õigusnorm
4. kv 2025
Jõustuvad õigusaktid, millega nähakse ette
keskkonnakahjulike toetuste vähendamine
2026. aastal vähemalt 4,5 miljardi euro võrra.
M7–6
Reform 3: Biometaani
gaasivõrguga liitumise
kulude vähendamine
Eesmärk
Selliste
õigusaktide
jõustumine,
millega
vähendatakse
biometaani
tootvate
jaamade
gaasivõrguga
liitumise kulusid
Seaduse säte, mis
viitab õigusaktide
jõustumisele
3. kv 2025
Õigusaktidega:
• Vähendada biometaani tootmisjaamade gaasivõrguga liitumise kulusid tootja jaoks.
• Pakkuda regulatiivseid stiimuleid gaasivõrku investeerimiseks, et suurendada taastuvatest energiaallikatest toodetud gaaside lõimimist.
• Hõlbustada põhi- ja jaotusvõrgu lõimimist, muu hulgas võrguühendusse tehtavate investeeringute kulude jagamise mehhanismide kaudu.
M7–7
Reform 4:
Taastuvelektri
ostulepingutega
seotud finantsriskide
maandamine
Eesmärk
Esmaste ja
teiseste
õigusaktide
jõustumine
Seaduse
jõustumisele viitav
õigusnorm
4. kv 2024
Esmaste ja teiseste õigusaktide jõustumine.
Esmaste õigusaktidega nähakse ette teiseste õigusaktide vastuvõtmine, millega rakendatakse allpool esitatud nõudeid i, ii ja iii.
Teiseste õigusaktidega:
i) nõuda, et iga ettevõtja tagaks elektriostulepingute vastuväärtuse osalise katmise elektriturul pakutavate tagatisvahenditega;
ii) kehtestada meetmed kohustuste
419
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk
/Siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
täitmata jätmise riski maandamiseks, sealhulgas nõuded ja piirangud pakkujale ning regulatiivsed karistused tootja kohustuste täitmata jätmise korral;
iii) teha kindlaks institutsionaalne üksus, kes võtab üle viimasena vastutava müüja/ostja rolli, kes võtab maksejõuetult vastaspoolelt üle ja tagab tema suhtes võetud kohustuste täitmise.
M7–9
Reform 5: Uute
oskuste kava –
Üleminek
Eesmärk
Uue oskuste
kava
(üleminekud) ja
rakendamise
tegevuskava
vastuvõtmine ja
avaldamine
Kava ja
tegevuskava
vastuvõtmine
1. kv 2024
14. detsembri 2021. aasta dekreediga vastu võetud ja 28. detsembri 2021. aasta väljaandes Gazzetta ufficiale n.307 avaldatud kava „Piano Nuove Competenze“ muudetakse ja jõustub uus üleminekuoskuste kava. Kava sisaldab üldpõhimõtteid, mida täpsustatakse piirkondlikes seadustes ja mis hõlmavad järgmist:
i) erasektori suurem kaasamine koolitusse; ii) töökohapõhise õppe ja
mikrokvalifikatsioonitunnistuste parem tunnustamine;
iii) põhjalikum tööturu eelanalüüs ja koolituse tööalase mõju jälgimine.
Samuti võetakse vastu rakendamise tegevuskava.
M7–10 Reform 5: Uute
oskuste kava – Eesmärk Õigusakti(de)
jõustumine Õigusaktide 3. kv 2025 Õigusakti(de) jõustumine, sealhulgas sätted,
420
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk
/Siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
Üleminek piirkondade ja
autonoomse(te)
provintsi(de)
jaoks
sätted millega:
i. tagama, et koolitustegevuse kavandamine: a) Kaasab erasektori sidusrühmi ja/või b) põhineb oskuste prognoosimise
vahendite kasutamisel, et vastata keskpikas ja pikas perspektiivis vajaminevatele oskustele, ja/või
c) keskendub rohe- ja digipöördeks vajalikele oskustele;
ja/või
ii. Valideerida koolitus ja selle tulemused, väljastades vastavalt ühistele miinimumstandarditele sertifikaadid järgmise kohta:
a) ettevõttesisene koolitus ja/või
b) mikrokvalifikatsioonitunnistused.
Õigusaktid jõustuvad kõigi Itaalia piirkondade ja autonoomsete provintside suhtes, välja arvatud Bolzano ja Valle d’Aosta.
M7–11
Investeering 1:
Võimendatud meede:
Arukad võrgud
Eesmärk
Võrgust
tarbimiseks
tarnitava
maksimaalse
võimsuse
suurenemine
Läbiviidud
sekkumised PUUDUVAD
PUUDUVA
D
PUUDUVA
D 2. kv 2026
Sõltumatu insener-tehniline aruanne (sõltumatud inseneriaruanded), mis tõendab (kinnitavad), et on tehtud sekkumisi, mille tulemusel on suurenenud võrgu poolt tarbimiseks tarnitud maksimaalne võimsus mitme tarnepunkti puhul, mis vastab vähemalt 230 000 elanikule lisaks 1 500 000 elanikule meetme M2C2–10 raames.
421
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk
/Siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
M7–12
Investeering 2:
Võimendatud meede:
Sekkumised
elektrivõrgu
vastupidavuse
suurendamiseks
Eesmärk
Suurendada
elektrivõrgu
vastupidavust
Läbiviidud
sekkumised PUUDUVAD
PUUDUVA
D
PUUDUVA
D 2. kv 2026
Sõltumatu inseneri aruanne (aruanded), milles tõendatakse, et on võetud meetmeid, mis vastavad elektrivõrgu vastupidavuse suurendamisele vähemalt 648 km võrra lisaks M2C2–13 alla kuuluvale 4 000 km-le.
M7–13
Investeering 3:
Võimendatud meede:
Vesiniku tootmine
mahajäetud
tööstusaladel
(vesinikuorud)
Siht
Paigaldatud
elektrolüüsisead
med
Number 10 12 2. kv 2026
12 vesinikuoru projekti raames paigaldatakse
12 elektrolüüsiseadet võimsusega vähemalt
1 MW.
Võrguühendust vajavatele
elektrolüüsiseadmetele antakse välja
liitumiskulude hinnangud, mille arendaja on
heaks kiitnud või mille eest ta on tasunud.
M7–14 Investeering 4:
Türreeni ühendus Eesmärk
Lepingute
sõlmimine
Lepingute
sõlmimisest
teatamine
3. kv 2024
Teade kõigi hankelepingute sõlmimise kohta,
mis on seotud 511 km Caracoli ja Eboli
vaheliste kaablite paigaldamisega.
M7–15 Investeering 4:
Türreeni ühendus Eesmärk
C-kategooriasse
kuuluv(ad)
seade(d)
Tehtud tööd PUUDUVAD PUUDUVA
D
PUUDUVA
D 2. kv 2026
Tehtud on tööd Sitsiiliat Campaniaga
ühendavate 1. kaabelühenduse
(kaabelühenduste) rajamiseks ja 500 MW
nimivõimsuse tagamiseks.
M7–16 Investeering 5:
SA.CO.I.3 Eesmärk
Lepingute
sõlmimine
Lepingute
sõlmimine 4. kv 2024
Kõigi Sardiinia ja Toscana
ümberehitusjaamade karpide valmimiseks
vajalike ehitustööde hankelepingute
sõlmimine.
M7–17 Investeering 5:
SA.CO.I.3 Eesmärk Muundamisjaam
ade karpide Tehtud tööd PUUDUVAD
PUUDUVA
D
PUUDUVA
D 2. kv 2026 Sardiinia (Codrongianos) ja Toscana
(Suvereto) ümberehitusjaamade kestade
422
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk
/Siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
ehitamine
Sardiinias
(Codrongianos)
ja Toscanas
(Suvereto)
ehitamiseks on tehtud töid.
M7–22 Investeering 7: Arukas
riiklik ülekandevõrk Eesmärk
5G-seadmete
paigaldamine,
info- ja
kommunikatsioo
nitehnoloogia
arhitektuur,
turvaline
protokoll 104
elektrijaamades
ja
seiresüsteemid
elektrimastides
Läbiviidud
sekkumised PUUDUVAD
PUUDUVA
D
PUUDUVA
D 2. kv 2026
Sõltumatu inseneri aruanne (aruanded), mis
tõendab (tõendavad), et on tehtud sekkumisi,
mille tulemusena paigaldati:
–5G-seadmed või info- ja
kommunikatsioonitehnoloogia arhitektuur
vähemalt 40 jaamas.
–Turvaprotokoll 104 (Rahvusvahelise Elektrotehnikakomisjoni 62 351 protokoll) vähemalt 250 elektrijaamas.
– Seiresüsteemid vähemalt 1 500 elektrimastis.
M7–25
Investeering 8:
Kriitilise tähtsusega
toorainete kestlik,
ringluspõhine ja
turvaline tarnimine
Eesmärk Aruande
avaldamine
kriitilise
tähtsusega
toorainete
tulevaste
vajaduste ja
ökodisaini
potentsiaali
kohta
Aruande
avaldamine PUUDUVAD
PUUDUVA
D
PUUDUVA
D 2. kv 2025
Avaldatakse aruanne, milles analüüsitakse
tulevasi vajadusi kriitilise tähtsusega
toorainete järele ja ökodisaini potentsiaali
vähendada nõudlust kriitilise tähtsusega
toorainete järele.
423
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk
/Siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
M7–26
Investeering 8:
Kriitilise tähtsusega
toorainete kestlik,
ringluspõhine ja
turvaline tarnimine
Eesmärk Geograafilise
informatsiooni
süsteemi
veebiplatvorm
Geoinfosüsteemi
platvorm on veebis
kättesaadav
PUUDUVAD PUUDUVA
D
PUUDUVA
D 4. kv 2025
Internetis on kättesaadav geoinfosüsteemi
platvorm, kus tehakse kindlaks
ringlussevõetavad materjalid linnakeskkonnas
ja jäätmed mahajäetud või suletud
kaevandustes.
M7–27
Investeering 8:
Kriitilise tähtsusega
toorainete kestlik,
ringluspõhine ja
turvaline tarnimine
Eesmärk
Linnakaevanda
mise ja
ökodisaini
laborite
seadmed
Tarnitud on
vähemalt kuue
linnakaevandamis
e ja ökodisaini
tehnoloogiakeskus
e labori seadmed
PUUDUVAD PUUDUVA
D
PUUDUVA
D 2. kv 2026
Tarne- ja vastuvõtuaruanded vähemalt kuue linnakaevandamise ja ökodisaini tehnoloogiakeskuse labori seadmete kohta.
M7–30
Investeering 10:
Oskuste katseprojekt
„Crescere Green“
Siht Koolitustunnistus
ed Number 0 20 000 4. kv 2025
Koolitustunnistused, mis on välja antud
vähemalt 20 000 katseprojektis osalejale.
Katseprojekt hõlmab vähemalt kahte piirkonda
ja puudutab ESCO andmebaasis määratletud
rohelisi kutseoskusi.
M7–31
Investeering 11:
Piirkondliku
ühistranspordi
raudteepargi
tugevdamine
heitevabade rongide ja
universaalteenuse abil
Siht Hangitud
rongide arv PUUDUVAD Number 0 79 2. kv 2026
Registreerimine või vastuvõtmise kinnitus
koos vastavusdeklaratsiooniga vähemalt 79
heitevaba (elektri- või
vesinikkütuseelemendiga) rongi peale
veeremi, millele on osutatud ülesande 2
komponendi 2 investeeringus 4.4.2
M7–32
Investeering 12
„Rahastamisvahend
rahvusvahelise
juhtpositsiooni
Eesmärk Rakenduskokkul
epe.
Rakenduskokkulep
pe jõustumine 1. kv 2024 Rakenduskokkuleppe jõustumine.
424
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk
/Siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
arendamiseks
tööstuses ning teadus-
ja arendustegevuses
heiteta busside
valdkonnas“
M7–50
Investeering 18 –
Laiendamismeede:
Era- ja väikeste
tarbesõidukite pargi
elektrisõidukitega
uuendamise
programm
Siht Ostetud
sõidukite arv PUUDUVAD Number 30 830 46 500 2. kv 2026
Lepingute allkirjastamine vähemalt 46 500
heiteta sõiduki ostmiseks.
Iga ostetud sõiduki kohta tuleb esitada ka vanametalliks lammutamise tõend, mis tõendab termilise sõiduki vanametalliks lammutamist.
425
KÜSIMUS 3. Laenuga seotud reformide ja investeeringute kirjeldus
Investeering 13. Aadria mere torujuhtme 1. etapp (Sulmona kompressorjaam ja Sestino-Minerbio
gaasijuhe)
Selle investeeringu eesmärk on suurendada ja mitmekesistada gaasi, sealhulgas veeldatud maagaasi
varustuskindlust. Meetme raames ehitatakse Sulmonasse kompressorjaam ja gaasijuhe, mis ühendab Sestino
ja Minerbio transpordisõlmi Aadria mere liini osana.
Investeering 14. Piiriülene gaasiekspordi infrastruktuur
Selle investeeringu eesmärk on suurendada ja mitmekesistada gaasi, sealhulgas veeldatud maagaasi
varustuskindlust. See investeering seisneb olemasoleva gaasitaristu ajakohastamises, et võimaldada maagaasi
eksporti Tarvisio väljalaskepunkti kaudu, eelkõige uue elektrikompressorüksuse ehitamise kaudu Poggio
Renatico kompressorjaama.
Investeering 15. Transizione 5.0
Selle investeeringu eesmärk on toetada ettevõtete üleminekut energiatõhusatele, säästvatele ja taastuvenergial
põhinevatele tootmismudelitele. Investeering seisneb ettevõtjatele maksukrediidi andmises, mis vastab
ajavahemikul 1. jaanuarist 2024 kuni 31. detsembrini 2025 kantud rahastamiskõlblikele kuludele, nimelt
digivarale (4,0 materiaalset kapitalikaupa, 4,0 immateriaalset kapitalikaupa92), taastuvatest energiaallikatest
omatootmiseks ja -tarbimiseks vajalikule varale (v.a biomass) ning töötajate koolitamisele rohepöördeks
vajalike oskuste valdkonnas. Investeering seisneb ka GSE – Gestore Servizi Energetici pakutava IT-
tugiplatvormi loomises ja sellega seotud juhtimis-, seire- ja kontrollitegevuses.
Investeering 16. Toetus VKEdele taastuvatest energiaallikatest omatarbeks toodetud energia
tootmiseks
See meede hõlmab avaliku sektori investeeringut toetuskavasse „VKEde toetamine taastuvatest
energiaallikatest omatarbeks toodetud energia tootmisel“, et stimuleerida erainvesteeringuid ja parandada
rahastamisvõimalusi Itaalia taastuvatest energiaallikatest omatarbeks toodetud energia tootmisel.
Kava eesmärk on toetada mikro-, väikeseid ja keskmise suurusega ettevõtjaid (VKEd) taastuvatest
energiaallikatest energia omatootmisele suunatud investeerimisprogrammide rakendamisel93.
Kava toimib toetuste andmise kaudu otse erasektorile.
Kava haldab rakenduspartnerina Invitalia SpA. Kava hõlmab järgmisi tootesarju:
- tagastamatud toetused, mis moodustavad vähemalt 30 % koguinvesteeringust – selliste süsteemide ja
nendega seotud digitehnoloogiate ostmiseks, mis võimaldavad taastuvatest energiaallikatest otse
toota energiat koheseks omatarbeks või akumulatsiooni-/salvestussüsteemide kaudu.
Kavasse tehtava investeeringu rakendamiseks allkirjastavad Itaalia ja Invitalia SpA rakenduskokkuleppe, mis
sisaldab järgmist:
1. Kava otsustusprotsessi kirjeldus: Kava lõpliku investeerimisotsuse teeb investeerimiskomitee või
muu asjakohane samaväärne juhtorgan ja see kiidetakse heaks valitsusest sõltumatute liikmete
häälteenamusega.
2. Seotud investeerimispoliitika põhinõuded,mis hõlmavad järgmist:
a) Antud toetuse liigi ja rahastamiskõlblike lõplike toetusesaajate kirjeldus.
b) Nõue, et kõik toetatavad investeeringud peavad olema majanduslikult elujõulised.
a. Nõue järgida põhimõtet „ei kahjusta oluliselt“, nagu on sätestatud põhimõtte „ei kahjusta
oluliselt“ tehnilistes suunistes (2021/C58/01). Eelkõige äriühingutele antava üldise toetuse
92 Eelkõige viidatakse kavas 11. detsembri 2016. aasta seaduse nr 232 A ja B lisale. 93 Konkreetsete projektidega seotud lõplikud toetusesaajad peavad kliimaalase panuse arvutamiseks esitama iga
toetatava projekti kohta valitud sekkumisvaldkonna põhjenduse koos projekti kirjeldusega. Rakenduspartner peab
samuti esitama liikmesriigile poolaastaaruande iga projekti/tegevuse rakendamise kohta.
426
puhul jäetakse investeerimispoliitikast välja äriühingud, kes keskenduvad peamiselt94
järgmistele sektoritele: i) fossiilkütustel põhinev energiatootmine ja sellega seotud tegevus95;
ii) energiamahukad ja/või suure CO2-heitega tööstusharud96; iii) saastavate sõidukite
tootmine, rentimine või müük97; iv) jäätmete kogumine, töötlemine ja98 kõrvaldamine, v)
tuumkütuse töötlemine, tuumaenergia tootmine. Lisaks nõutakse investeerimispoliitikas, et
kava lõplikud abisaajadjärgiksid asjakohaseid ELi ja riiklikke keskkonnaalaseid õigusakte.
c) Nõue, et kava lõplikud abisaajad ei tohi samade kulude katmiseks saada toetust muudest
liidu vahenditest.
3. Rakenduslepinguga hõlmatud summa, rakenduspartneri tasude struktuur ja nõue investeerida kava
kasutamata tulu, sealhulgas pärast 2026. aastat, samadel poliitilistel eesmärkidel.
4. Seire-, auditi- ja kontrollinõuded, sealhulgas:
i) Rakenduspartneri järelevalvesüsteemi kirjeldus, et anda aru kaasatud investeeringute kohta.
ii) Rakenduspartneri selliste menetluste kirjeldus, millega tagatakse pettuste, korruptsiooni ja
huvide konfliktide ennetamine, avastamine ja kõrvaldamine.
iii) Kohustus kontrollida iga tehingu puhul enne rahastamiskohustuse võtmist tehingu
rahastamiskõlblikkust kooskõlas rakenduslepingus sätestatud nõuetega;
iv) Kohustus teha riskipõhiseid järelauditeid vastavalt Invitalia SpA auditikavale. Auditite
käigus veendutakse, et i) kontrollisüsteemid on tõhusad, muu hulgas pettuste, korruptsiooni
ja huvide konfliktide avastamisel, ii) põhimõtte „ei kahjusta oluliselt“ järgimine, riigiabi
eeskirjad, kliimaeesmärgi nõuded; ning iii) järgitakse nõuet, et kava lõplikud abisaajad ei
tohi olla saanud samade kulude katmiseks toetust muudest liidu vahenditest. Auditite käigus
kontrollitakse ka tehingute seaduslikkust ja kohaldatava rakenduskokkuleppe tingimuste
täitmist.
94 Lõplikul abisaajal on „oluline fookus“ sektorile või äritegevusele, kui seda sektorit või tegevust peetakse lõpliku
abisaaja äritegevuse oluliseks osaks vastavalt seoses lõpliku abisaaja brutotulu, kasumi või kliendibaasiga. Piiratud
sektorist või tegevusest saadav brutotulu ei tohi mingil juhul ületada 50 % brutotulust. 95 Välja arvatud a) varad ja tegevused maagaasi kasutavas elektri- ja/või soojusenergia tootmises ning sellega seotud
ülekande- ja jaotustaristus, mis vastavad põhimõtte „ei kahjusta oluliselt“ tehniliste suuniste (2021/C58/01) III lisas
sätestatud tingimustele, ning b) alapunktis ii osutatud tegevused ja varad, mille puhul fossiilkütuste kasutamine on
fossiilkütustevabale käitamisele õigeaegseks üleminekuks ajutine ja tehniliselt vältimatu. 96 Sealhulgas ELi heitkogustega kauplemise süsteemi (HKS) alla kuuluvad tegevused ja varad, millega saavutatakse
prognoositud kasvuhoonegaaside heide, mis ei ole asjaomastest võrdlusalustest väiksem. Kui toetatava tegevusega
saavutatakse prognoositud kasvuhoonegaaside heide, mis ei ole asjaomastest võrdlusalustest oluliselt väiksem,
esitatakse selgitus selle kohta, miks see ei ole võimalik. Saastekvootide tasuta eraldamise võrdlusalused
saastekvootidega kauplemise süsteemi kohaldamisalasse kuuluvate tegevuste jaoks on sätestatud komisjoni
rakendusmääruses (EL) 2021/447. 97 Saastavad sõidukid on määratletud heiteta sõidukitena. 98 Seda erandit ei kohaldata meetmete suhtes, mida võetakse tehastes, mis on ette nähtud üksnes ringlussevõetamatute
ohtlike jäätmete töötlemiseks, ja olemasolevates tehastes, kui käesoleva meetme kohaste meetmete eesmärk on
suurendada energiatõhusust, koguda heitgaase ladustamiseks või kasutamiseks või taaskasutada põletustuhast saadud
materjale, tingimusel et sellised käesoleva meetme kohased meetmed ei suurenda tehaste jäätmetöötlusvõimsust ega
pikenda nende kasutusiga; tõendid selle kohta tuleb esitada iga jaama kohta eraldi.
427
Investeering 17. Rahastamisvahend avaliku sektori elamute energiatõhusaks renoveerimiseks
Meetme eesmärk on toetada avaliku sektori elamute renoveerimist. See meede koosneb avaliku sektori
investeeringutest rahastusse, mis on energiaostuvõimetuse leevendamise rahastamisvahend, et stimuleerida
erainvesteeringuid ja parandada juurdepääsu rahastamisele. Vahend on suunatud avaliku sektori elamute
energiatõhusaks renoveerimisele, millega saavutatakse primaarenergia nõudluse vähendamine keskmiselt
vähemalt 30 %99.
Rahastut haldavad kaks rakenduspartnerit.
• Gestore Servizi Energetici (GSE Spa) kui toetuskomponendi eest vastutav tehniline partner;
• Cassa Depositi e Prestiti (CDP Spa) on finantspartner ja vastutab (vabatahtliku) laenukomponendi
eest.
Rahastust antakse toetuste ja/või laenudena rahalist toetust avaliku sektori elamute energiatõhusaks
renoveerimiseks, millega saavutatakse primaarenergia nõudluse vähenemine keskmiselt vähemalt 30 %.
Rahastu hõlmab järgmisi tootesarju, et toetada munitsipaaleluasemeid:
· Tehnilise partneri Gestore Servizi Energetici Spa pakutav toetus, mis katab maksimaalselt 65 %
kogukuludest;
· Vabatahtlik laenukomponent, mis katab 35 % kogukuludest. Laenukomponendi võib pakkuda
finantspartner Cassa Depositi e Prestiti
Rahastusse tehtava investeeringu rakendamiseks allkirjastavad Itaalia ja rakenduspartner(id)
rakenduslepingu(d), mis sisaldab (sisaldavad) järgmist:
1. Rahastu otsustusprotsessi kirjeldus: Rahastu lõplikud investeerimisotsused teeb investeeringute
komitee või muu vastav samaväärne juhtorgan ning need kiidetakse heaks valitsusest sõltumatute
liikmete häälteenamusega.
2. Seotud investeerimispoliitika põhinõuded,mis hõlmavad järgmist:
a. Finantstoote/finantstoodete ja rahastamiskõlblike lõplike abisaajate kirjeldus;
b. Nõue, et kõik toetatavad investeeringud peavad olema majanduslikult elujõulised.
c. Nõue järgida põhimõtet „ei kahjusta oluliselt“, nagu on sätestatud põhimõtte „ei kahjusta
oluliselt“ tehnilistes suunistes (2021/C58/01). Eelkõige jäetakse investeerimispoliitikaga
rahastamiskõlblikkuse alt välja järgmised tegevused ja varad: i) fossiilkütustega seotud
tegevus ja varad, sealhulgas allkasutus, ii) ELi heitkogustega kauplemise süsteemi100 (HKS)
alla kuuluvad tegevused ja varad, millega saavutatakse prognoositud kasvuhoonegaaside
heide, mis ei ole asjaomastest võrdlusalustest väiksem,101 iii) prügilate,
jäätmepõletustehaste ja mehaanilis-bioloogilise töötlemise jaamadega seotud tegevus102 ja
varad103.
99 Konkreetsete projektidega seotud lõplikud toetusesaajad peavad kliimaalase panuse arvutamiseks esitama iga
toetatava projekti kohta valitud sekkumisvaldkonna põhjenduse koos projekti kirjeldusega. Rakenduspartner peab
samuti esitama liikmesriigile poolaastaaruande iga projekti/tegevuse rakendamise kohta. 100 Välja arvatud a) varad ja tegevused maagaasi kasutavas elektri- ja/või soojusenergia tootmises ning sellega seotud
ülekande- ja jaotustaristus, mis vastavad põhimõtte „ei kahjusta oluliselt“ tehniliste suuniste (2021/C58/01) III lisas
sätestatud tingimustele, ning b) alapunktis ii osutatud tegevused ja varad, mille puhul fossiilkütuste kasutamine on
fossiilkütustevabale käitamisele õigeaegseks üleminekuks ajutine ja tehniliselt vältimatu. 101 Kui toetatava tegevusega saavutatakse prognoositud kasvuhoonegaaside heide, mis ei ole asjaomastest
võrdlusalustest oluliselt väiksem, esitatakse selgitus selle kohta, miks see ei ole võimalik. Saastekvootide tasuta
eraldamise võrdlusalused saastekvootidega kauplemise süsteemi kohaldamisalasse kuuluvate tegevuste jaoks on
sätestatud komisjoni rakendusmääruses (EL) 2021/447. 102 Välistamist ei kohaldata meetme tegevuste suhtes, mis toimuvad üksnes ringlussevõetamatute ohtlike jäätmete
töötlemisega tegelevates jaamades, ega olemasolevate jaamade suhtes, kui meetme tegevuste eesmärk on suurendada
428
d. Nõue, et rahastu lõplikud toetusesaajad ei saa samade kulude katmiseks toetust muudest liidu
vahenditest. Rahastamisvahendi laenukomponendi kaudu antav rahaline toetus ei kata samu
kulusid, mida toetatakse rahastamisvahendi toetuskomponendist.
3. Rakenduslepinguga hõlmatud summa, rakenduspartneri tasude struktuur ja nõue reinvesteerida mis
tahes tagasisaadavad vahendid vastavalt rahastu investeerimispoliitikale, välja arvatud juhul, kui neid
kasutatakse taaste- ja vastupidavusrahastu laenude tagasimaksete teenindamiseks.
4. Seire-, auditi- ja kontrollinõuded, sealhulgas:
a. Rakenduspartneri järelevalvesüsteemi kirjeldus, et anda aru kaasatud investeeringute kohta.
b. Rakenduspartneri selliste menetluste kirjeldus, millega tagatakse pettuste, korruptsiooni ja
huvide konfliktide ennetamine, avastamine ja kõrvaldamine.
c. Kohustus kontrollida iga tehingu puhul enne rahastamiskohustuse võtmist tehingu
rahastamiskõlblikkust kooskõlas rakenduslepingus sätestatud nõuetega;
d. Kohustus teha riskipõhiseid järelauditeid vastavalt Gestore dei Servizi Energetici (GSE) ja
Cassa Depositi e Prestiti (CDP) auditikavale. Auditite käigus veendutakse, et i)
kontrollisüsteemid on tõhusad, muu hulgas pettuste, korruptsiooni ja huvide konfliktide
avastamisel, ii) põhimõtte „ei kahjusta oluliselt“ järgimine, riigiabi eeskirjad, kliimaeesmärgi
nõuded; ning iii) järgitakse nõuet, et rahastu lõplikud toetusesaajad ei tohi olla saanud
samade kulude katmiseks toetust muudest liidu vahenditest. Auditite käigus kontrollitakse ka
tehingute seaduslikkust ja kohaldatava rakenduskokkuleppe tingimuste täitmist.
energiatõhusust, koguda heitgaase ladustamiseks või kasutamiseks või taaskasutada põletustuhas leiduvaid materjale,
tingimusel et need tegevused ei suurenda jaamade jäätmetöötlusvõimsust ega pikenda nende kasutusiga; tõendid selle
kohta tuleb esitada iga jaama kohta eraldi. 103 Välistamist ei kohaldata meetme tegevuste suhtes, mis toimuvad olemasolevates mehhaanilis-bioloogilise töötlemise
jaamades, kus nende tegevuste eesmärk on suurendada energiatõhusust või moderniseerida eraldatud jäätmete
ringlussevõttu biojäätmete kompostimiseks ja biojäätmete anaeroobseks lagundamiseks, tingimusel et need tegevused ei
suurenda jaamade jäätmetöötlusvõimsust ega pikenda nende kasutusiga; tõendid selle kohta tuleb esitada iga jaama
kohta eraldi.
429
KÜSIMUS 4. Laenu eesmärgid, sihid, näitajad ning seire ja rakendamise ajakava
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk
/Siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
M7–35
Investeering 13:
Aadria mere
torujuhtme 1.
etapp (Sulmona
kompressorjaam ja
Sestino-Minerbio
gaasijuhe)
Eesmärk
Asjakohaste
keskkonnamõju
hindamiste
(VIncA)
vastuvõtmine ja
ajakohastamine
SSCOd on kindlaks
määratud ning VincA
on vastavalt läbi
vaadanud ja vastu
võtnud
1. kv 2024
Itaalia ametiasutused:
• Kehtestada projektist mõjutatud Natura 2000 alade jaoks alapõhised kaitse-eesmärgid vastavalt keskkonna- ja energiajulgeoleku ministeeriumi poolt 2021. ja 2023. aastal vastu võetud metoodikale.
• Kontrollida elupaikade direktiivi alusel juba tehtud asjakohaseid hindamisi, võttes arvesse hiljuti loodud olulisi ohutustegureid.
• Ajakohastada (vajaduse korral) elupaikade direktiivi alusel juba tehtud asjakohaseid hindamisi (VINCAd) kooskõlas 28. detsembri 2019. aasta riiklike suunistega ning tagada nende integreerimine üldisesse keskkonnamõju hindamise menetlusse.
M7–36
Investeering 13:
Aadria mere
torujuhtme 1.
etapp (Sulmona
kompressorjaam ja
Sestino-Minerbio
Eesmärk Lepingute
sõlmimine
Lepingute
sõlmimisest
teatamine
2. kv 2024
Teade kõigi Sulmona kompressorjaama ja
Sestino-Minerbio gaasijuhtme ehitamiseks
vajalike ehitustööde lepingute sõlmimise
kohta.
430
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk
/Siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
gaasijuhe)
M7–37
Investeering 13:
Aadria mere
torujuhtme 1.
etapp (Sulmona
kompressorjaam ja
Sestino-Minerbio
gaasijuhe)
Eesmärk
Sulmona
kompressorjaam
a ja Sestino
Minerbio
gaasijuhtme
ehitustööd
Tehtud tööd 2. kv 2026
Sulmona kompressorjaamas ja Sestino-
Minerbio gaasijuhtmes on tehtud töid
gaasitranspordi tehnilise võimsuse
suurendamiseks 14 miljoni kuupmeetri
võrra päevas.
M7–38
Investeering 14:
Piiriülene
gaasiekspordi
infrastruktuur
Eesmärk Lepingute
sõlmimine
Lepingute
sõlmimisest
teatamine
2. kv 2024
Teade kõigi Poggio Renatico
kompressorjaama valmimiseks vajalike
ehitustööde lepingute sõlmimise kohta
M7–39
Investeering 14:
Piiriülene
gaasiekspordi
infrastruktuur
Eesmärk
Poggio Renatico
kompressorjaam
as tehtud tööd
Tehtud tööd 2. kv 2026
Tehtud on tööd Poggio Renatico
kompressorjaama kompressorüksusega,
et suurendada Tarvisio väljumispunkti
kaudu gaasi eksportimise tehnilist
võimsust 8 miljardi kuupmeetri võrra
aastas.
M7–40 Investeering 15:
Transizione 5.0 Eesmärk
Rahastamiskõlbli
ke sekkumiste
kriteeriume
kehtestava
õigusakti
jõustumine
Seaduse
jõustumisele viitav
õigusnorm
1. kv 2024
Õigusaktiga tehakse ülemineku 5.0
maksukrediidid võimalikele
toetusesaajatele kättesaadavaks,
määrates kindlaks rahastamiskõlblikkuse
kriteeriumid, sealhulgas minimaalse
energiasäästu ja meetme kulude
431
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk
/Siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
ülemmäära.
M7–41 Investeering 15:
Transizione 5.0 Siht
Ettevõtetele
2024.–2025.
aastal esitatud
dokumentide
alusel antud
maksukrediidid
PUUDUVAD
Eraldatud
vahendite
summa
(eurodes)
0 2 500 000 000 2. kv 2026
Teade kõigi taaste- ja vastupidavusrahastu
vahendite eraldamise kohta, mis on selleks
investeeringuks ette nähtud.
Vähemalt 1 000 000 000 euro suurune
investeering aitab kaasa kliimamuutustega
seotud eesmärkide saavutamisele
kooskõlas taaste- ja vastupidavusrahastu
määruse VI lisaga.
GSE (Gestore Servizi Energetici) aruanne,
milles tõendatakse ajavahemikul 2024–
2026 energia lõpptarbimises saavutatud
energiatõhususe kogusäästu.
M7–43
Investeering 16:
Toetus VKEdele
taastuvatest
energiaallikatest
omatarbeks
toodetud energia
tootmiseks
Eesmärk Rakenduskokkul
epe.
Rakenduskokkulepp
e jõustumine 4. kv 2024 Rakenduskokkuleppe jõustumine.
M7–44
Investeering 16:
Toetus VKEdele
taastuvatest
energiaallikatest
Eesmärk
Itaalia Ettevõtlus-
ja Made in Italy
on viinud lõpule
rahaliste
Üleviimistunnistus 4. kv 2024 Itaalia kannab rahastu jaoks Invitaliasse
üle 186 651 988,92 eurot.
432
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk
/Siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
omatarbeks
toodetud energia
tootmiseks
vahendite
ülekandmise
Invitaliale
M7–45
Investeering 16:
Toetus VKEdele
taastuvatest
energiaallikatest
omatarbeks
toodetud energia
tootmiseks
Siht
Õiguslikud
kokkulepped
lõplike
abisaajatega
PUUDUVAD Protsent (%) 0 100 % 2. kv 2026
Invitalia S.p.A. peab olema sõlminud
lõplike toetusesaajatega õiguslikud
kokkulepped summas, mis on vajalik
taaste- ja vastupidavusrahastust kavasse
tehtud investeeringu 100 % kasutamiseks
(võttes arvesse haldustasusid).
M7–46
Investeering 17:
Rahastamisvahend
avaliku sektori
elamute
energiatõhusaks
renoveerimiseks
Eesmärk
Volituste
eesmärgi
määratlemine
Õigusakti jõustumine
koos
rahastamisvahendi
pädevuse
määratlusega
3. kv 2024
Määrata kindlaks rahastamisvahendi
tingimused, mis on suunatud avaliku
sektori elamute energiatõhusaks
renoveerimisele.
M7–47
Investeering 17:
Rahastamisvahend
avaliku sektori
elamute
energiatõhusaks
renoveerimiseks
Eesmärk Rakenduskokkul
epe.
Rakenduskokkulepp
e jõustumine 2. kv 2025
Rakenduskokkuleppe (te) jõustumine
kooskõlas meetme kirjelduses täpsustatud
nõuetega.
Eelkõige peab (peavad)
rakenduskokkulepe(ed) sisaldama
rahastamiskõlblikkuse kriteeriume seoses
energiatõhususe parandamise
miinimumtasemega, mille instrument peab
saavutama (keskmiselt vähemalt 30 %
433
Järjekorra-
number
Seotud meede
(reform või
investeering)
Eesmärk
/Siht Nimetus
Kvalitatiivsed
näitajad (vahe-eesmärgid)
Kvantitatiivsed näitajad (sihtide puhul)
Lõpuleviimise
soovituslik
ajakava Iga eesmärgi ja sihi kirjeldus
Mõõtühik Lähtestse
naarium Eesmärk Nõuded Aasta
primaarenergia nõudluse vähendamisest).
Valikukriteeriumides seatakse esikohale ka
sekkumised, mis annavad
energiatõhususe seisukohast suurimat
kasu.
M7–48
Investeering 17:
Rahastamisvahend
avaliku sektori
elamute
energiatõhusaks
renoveerimiseks
Eesmärk
Ministeerium on
investeeringu
lõpule viinud
Üleviimistunnistus PUUDUVA
D PUUDUVAD 2. kv 2025
Itaalia kannab rahastu
rakenduspartneri(te)le üle 1 381 000 000
eurot.
M7–49
Investeering 17:
Rahastamisvahend
avaliku sektori
elamute
energiatõhusaks
renoveerimiseks
Siht
Lõplike
abisaajatega
sõlmitud
õiguslikud
kokkulepped
Protsendimäär
(%) 0 % 100 % 2. kv 2026
Itaalia kannab rahastu
rakenduspartneri(te)le üle täiendavalt
200 000 000 eurot.
Rakenduspartner(id) peab (peavad) olema
sõlminud lõplike toetusesaajatega
seaduslikud rahastamislepingud summas,
mis on vajalik, et kasutada 100 % taaste-
ja vastupidavusrahastu investeeringust
rahastusse (võttes arvesse haldustasusid).
434
2. TAASTE- JA VASTUPIDAVUSKAVA HINNANGULINE KOGUKULU
Itaalia taaste- ja vastupidavuskava hinnanguline kogukulu on 194 435 381 164 eurot.
REPowerEU peatüki hinnanguline kogumaksumus on 7 212 200 000 eurot. Eelkõige on määruse (EL)
2023/435 artikli 21c lõike 3 punktis a osutatud meetmete hinnanguline kogukulu 420 000 000 eurot,
samas kui REPowerEU peatüki muude meetmetekulud on 6 792 200 000 eurot.
LÕIK 2: RAHALINE TOETUS
1. Rahalised sissemaksed
Artikli 2 lõikes 2 osutatud osamaksed korraldatakse järgmiselt.
1.1. Esimene osamakse (tagastamatu toetus):
Järjekorra-
number
Seotud meede (reform
või investeering)
Eesmärk/si
ht Nimetus
M1C1–51 Reform 1.9: Avaliku
halduse reform Eesmärk
Itaalia taaste- ja vastupidavuskava juhtimist
käsitlevate esmaste õigusaktide jõustumine
M1C1–52 Reform 1.9: Avaliku
halduse reform Eesmärk
Itaalia taaste- ja vastupidavuskava rakendamise
haldusmenetluste lihtsustamist käsitlevate esmaste
õigusaktide jõustumine.
M1C1–53
Investeering 1.9: Anda
tehnilist abi ja tugevdada
suutlikkuse suurendamist
Itaalia taaste- ja
vastupidavuskava
rakendamiseks
Eesmärk
Itaalia taaste- ja vastupidavuskava rakendamiseks
tehnilise abi andmist ja suutlikkuse suurendamist
käsitlevate esmaste õigusaktide jõustumine
M1C1–69
Reform 1.10:
Riigihangete
õigusraamistiku reform
Eesmärk Riigihangete süsteemi lihtsustamist käsitleva dekreedi
jõustumine
M1C1–1 Reform 1.1: IKT-hanked Eesmärk Reformi 1.1 „IKT hanked“ käsitlevate dekreet-
seaduste jõustumine
M1C1–2
Reform 1.3:
Pilvandmetöötluse
esikohale seadmine ja
koostalitlusvõime
Eesmärk
Reformi 1.3 „Kõigepealt pilvandmetöötlus ja
koostalitlusvõime“ käsitlevate dekreet-seaduste
jõustumine
M1C1–29 Reform 1.4:
Tsiviilõiguse reform Eesmärk
Tsiviilõiguse reformi võimaldavate õigusaktide
jõustumine
M1C1–30 Reform 1.5:
Kriminaalõiguse reform Eesmärk
Kriminaalõigusreformi võimaldavate õigusaktide
jõustumine
M1C1–31
Reform 1.6:
Maksejõuetusraamistiku
reform
Eesmärk Maksejõuetusreformi raamistikku võimaldavate
õigusaktide jõustumine
M1C1–32
Investeering 1.8: Tsiviil-,
kriminaal- ja
halduskohtute
värbamismenetlused
Eesmärk Riiklike taaste- ja vastupidavuskavade värbamist
reguleerivate eriõigusaktide jõustumine
M1C1–54 Investeering 1.9: Anda Siht Lõpule viidud ekspertide värbamine Itaalia taaste- ja
435
Järjekorra-
number
Seotud meede (reform
või investeering)
Eesmärk/si
ht Nimetus
tehnilist abi ja tugevdada
suutlikkuse suurendamist
Itaalia taaste- ja
vastupidavuskava
rakendamiseks
vastupidavuskava rakendamiseks
M1C1–55 Reform 1.9: Avaliku
halduse reform Eesmärk
Itaalia taaste- ja vastupidavuskava suhtes kohaldatava
metoodika laiendamine riigieelarvele, et suurendada
investeeringute kasutamist
M1C1–68 Reform 1.9: Avaliku
halduse reform Eesmärk
Auditi ja kontrolli andmekogu süsteem: teave taaste-
ja vastupidavusrahastu rakendamise järelevalveks
M1C1–71
Reform 1.10:
Riigihangete
õigusraamistiku reform
Eesmärk
Kõigi riigihankesüsteemi jaoks vajalike õigusaktide,
määruste ja rakendusaktide (sealhulgas teiseste
õigusaktide) jõustumine
M1C1–100
Reform 1.13: Kulude
läbivaatamise raamistiku
reform
Eesmärk
Kulude läbivaatamise tulemuslikkust parandavate
õigusnormide jõustumine – rahandusministeeriumi
tugevdamine
M1C1–101 Reform 1.12:
Maksuhalduse reform Eesmärk
Maksudest kõrvalehoidumise vähendamise võimalike
meetmete läbivaatamise vastuvõtmine
M1C2–1 Investeering 1: Üleminek
4.0 Eesmärk
Selliste õigusaktide jõustumine, millega tehakse
ülemineku 4.0 maksusoodustused võimalikele
toetusesaajatele kättesaadavaks, ja teaduskomitee
loomine
M1C3–8 Investeeringud – 4.1
Digiturismi keskus Eesmärk
Lepingute sõlmimine digitaalse turismi portaali
arendamiseks
M2C2–7
Reform 2 – Uued
õigusaktid taastuvatest
energiaallikatest
toodetud gaasi tootmise
ja tarbimise
edendamiseks
Eesmärk
Jõustub seadusandlik dekreet, millega edendatakse
taastuvatest energiaallikatest toodetud gaasi
kasutamist biometaani kasutamiseks transpordi-,
tööstus- ja elamusektoris, ning rakendusmäärus,
milles sätestatakse selle kasutamise tingimused ja
kriteeriumid ning uus stiimulite süsteem.
M2C2–37
Reform 5: Arukamad
menetlused projektide
hindamiseks kohalike
ühistranspordisüsteemide
sektoris, kus on
paigaldised, ja kiire
ühistranspordi sektoris
Eesmärk Dekreet-seaduse jõustumine
M2C2–41 Investeering 5.3:
Elektribussid Eesmärk
Jõustub ministri dekreet, millega määratakse kindlaks
sekkumise eesmärgi saavutamiseks kasutada olevad
vahendid (busside tarneahel).
M2C3–1
Investeering 2.1 –
Energiatõhususe
ökoboonuse
tugevdamine
Eesmärk Superbonuse pikenduse jõustumine
M2C4–3
Reform 4.2 „Meetmed
integreeritud veeteenuste
täieliku
juhtimissuutlikkuse
tagamiseks“
Eesmärk Vee parema majandamise ja säästva kasutamise
õigusraamistiku reform
M3C2–3
Reform 2.1 – Ühtse
tolliliidese („Sportello
Unico Doganale“)
rakendamine
Eesmärk Ühtse tollipunkti (Sportello Unico Doganale) määruse
jõustumine
436
Järjekorra-
number
Seotud meede (reform
või investeering)
Eesmärk/si
ht Nimetus
M4C1–1
Reform 1.5: Ülikooli
kraadiõppe rühmade
reform; Reform 1.6:
Ülikoolikraadide reformi
võimaldamine; Reform
4.1: Doktorikraadiga
programmide reform
Eesmärk
Kolmanda taseme haridussüsteemi reformide
jõustumine haridustulemuste parandamiseks (esmased
õigusaktid) järgmistes valdkondades: a) võimaldada
akadeemilist kraadi; b) akadeemilise kraadi rühmad;
C) doktoriõppeprogrammide reform
M4C1–2
Investeering 1.7:
Stipendiumid ülikooli
pääsemiseks
Eesmärk
Ministri määruste jõustumine, millega reformitakse
stipendiume, et parandada juurdepääsu kolmanda
taseme haridusele
M5C1–1
Reform 1 – aktiivsed
tööturumeetmed ja
kutseõpe
Eesmärk
Jõustub ministeeriumidevaheline dekreet, millega
kehtestatakse töötajate garanteeritud tööalase
konkurentsivõime riiklik programm, ja
ministeeriumidevaheline dekreet, millega
kehtestatakse uute oskuste riiklik kava
M5C2–1
Reform 1 – puuetega
inimesi käsitlev
raamseadus
Eesmärk Puuetega inimeste iseseisvust tugevdava raamseaduse
jõustumine.
M5C2–5
Investeering 1 –
Haavatavate inimeste
toetamine ja
institutsionaliseerimise
ennetamine
Eesmärk Tegevusplaani jõustumine
Osamakse
summa 11 494 252 874 EUROT
1.2. Teine osamakse (tagastamatu toetus):
Järjekorra-
number
Seotud meede (reform
või investeering)
Eesmärk/si
ht Nimetus
M2C4–5
Investeering 3.2:
Rahvusparkide
digiteerimine
Eesmärk
Rahvusparkide ja merekaitsealade külastajatele
osutatavate digiteenuste halduskorra lihtsustamise ja
arendamise jõustumine
M5C2–9 Investeering 3 – Esmalt
eluase ja postijaamad Eesmärk
Tegevusplaani jõustumine seoses projektidega
„Esmalt eluase“ ja postijaamadega, milles
määratakse kindlaks nõuded projektidele, mida
võivad esitada kohalikud üksused, ning
projektikonkursi algatamine
M1C1–33
Investeering 1.8:
Halduskohtute
värbamismenetlused
Siht Halduskohtute värbamismenetluste alustamine
M1C1–56 Reform 1.9: Avaliku
halduse reform Eesmärk
Avaliku sektori tööhõive reformi võimaldavate
õigusaktide jõustumine
M1C1–70
Reform 1.10:
Riigihangete
õigusraamistiku reform
Eesmärk Riigihangete seadustiku muutmise jõustumine
(D.Lgs. nr 50/2016)
M1C1–103 Reform 1.12:
Maksuhalduse reform Eesmärk
Esmaste ja teiseste õigusaktide ja õigusnormide
jõustumine ning maksukuulekust soodustavate ning
auditeid ja kontrolle parandavate haldusmenetluste
lõpuleviimine
437
Järjekorra-
number
Seotud meede (reform
või investeering)
Eesmärk/si
ht Nimetus
M1C1–104
Reform 1.13: Kulude
läbivaatamise raamistiku
reform
Eesmärk Kulude läbivaatamise säästueesmärkide
vastuvõtmine aastateks 2023–2025
M1C3–11
Investeering 1.3 –
Energiatõhususe
parandamine kinodes,
teatrites ja muuseumides
Eesmärk
Jõustub kultuuriministeeriumi dekreet vahendite
eraldamise kohta: parandada energiatõhusust
kultuuripaikades
M2C1–1 Reform 1.1 – Riiklik
ringmajanduse strateegia Eesmärk
Riikliku ringmajanduse strateegia vastuvõtmist
käsitleva ministri käskkirja jõustumine
M2C1–2
Reform 1.3 – Tehniline
tugi kohalikele
omavalitsustele
Eesmärk
Kohalike ametiasutuste toetamiseks mõeldud
suutlikkuse suurendamise tegevuskava
väljatöötamise kokkuleppe heakskiitmine
M2C1–11
Investeering 3.3: Kultuur
ja teadlikkus
keskkonnateemadest ja -
probleemidest
Eesmärk Veebiplatvormi käivitamine ja lepingud autoritega
M2C2–18
Investeering 3.5 –
Vesinikualane teadus- ja
arendustegevus
Eesmärk Kõigi riiklike teadus- ja arenduslepingute sõlmimine
vesinikualaste teadusprojektidega
M2C2–21
Reform 4 – Vesiniku
konkurentsivõime
edendamise meetmed
Eesmärk Maksusoodustuste jõustumine
M2C2–38
Investeering 5.1:
Taastuvad energiaallikad
ja akud
Eesmärk Ministri käskkirja jõustumine
M2C2–42
Investeering 5.4:
Omakapitalisüst
rohepöörde fondi (GTF)
Eesmärk Rahastamislepingu allkirjastamine
M2C3–4
Reform 1.1:
Energiatõhususega
seotud sekkumiste
menetluste lihtsustamine
ja kiirendamine
Eesmärk Energiatõhususega seotud sekkumiste menetluste
lihtsustamine ja kiirendamine
M2C4–1
Reform 2.1.
Hüdrogeoloogilise
ebastabiilsuse vastaste
meetmete rakendamise
menetluste lihtsustamine
ja kiirendamine
Eesmärk Hüdroloogiliste riskide parema juhtimise
õigusraamistiku lihtsustamise jõustumine
M2C4–4
Reform 4.2 „Meetmed
integreeritud veeteenuste
täieliku
juhtimissuutlikkuse
tagamiseks“
Eesmärk Niisutamise uue õigusraamistiku jõustumine
M4C1–3 Reform 2.1: Õpetajate
värbamine Eesmärk Õpetajaameti reformi jõustumine.
M4C1–4
Investeering 3.2: Kool
4.0: innovaatilised
koolid, juhtmestik, uued
klassiruumid ja õpikojad
Eesmärk Kool 4.0 Itaalia koolisüsteemi digiülemineku
edendamise kava on vastu võetud
M4C2–4
Reform 1.1: Teadus- ja
arendustegevust
toetavate meetmete
Eesmärk
Jõustub ministri dekreet teadus- ja arendustegevuse
lihtsustamise ja liikuvuse kohta, mis on seotud
tavapärase rahastamisfondiga.
438
Järjekorra-
number
Seotud meede (reform
või investeering)
Eesmärk/si
ht Nimetus
rakendamine
lihtsustamise ja liikuvuse
edendamiseks
Osamakse
summa 11 494 252 874 EUROT
1.3. Kolmas osamakse (tagastamatu toetus):
Järjekorra-
number
Seotud meede (reform või
investeering)
Eesmärk/si
ht Nimetus
M2C4–2
Reform 4.2 „Meetmed integreeritud
veeteenuste täieliku juhtimissuutlikkuse
tagamiseks“
Eesmärk
Integreeritud veeteenuste täieliku
juhtimissuutlikkuse tagamise
reformi jõustumine
M1C1–3 Investeering 1.1: Digitaristu Eesmärk Polo Strategico Nazionale (PSN)
programmi lõpuleviimine
M1C1–4 Investeering 1.3.1: Riiklik digitaalne
andmeplatvorm Eesmärk
Toimib riiklik digitaalne
andmeplatvorm
M1C1–5 Investeering 1.5: Küberturvalisuseni Eesmärk Uue riikliku küberturvalisuse ameti
loomine
M1C1–6 Investeering 1.5: Küberturvalisuseni Eesmärk Riiklike küberturvalisuse teenuste
esialgne kasutuselevõtt
M1C1–7 Investeering 1.5: Küberturvalisuseni Eesmärk
Küberturvalisuse kontrolli- ja
sertifitseerimislaborite võrgustiku
käivitamine
M1C1–8 Investeering 1.5: Küberturvalisuseni Eesmärk
PSNC ja võrgu- ja infoturbe
turvameetmete auditi kesküksuse
aktiveerimine
M1C1–9 Investeering 1.5: Küberturvalisuseni Siht Turvastruktuuride ajakohastamise
toetamine T1
M1C1–10 Reform 1.2: Ümberkujundamistoetus Eesmärk
Ümberkujundamisrühma ja uue
koordineerimisüksuse loomise
jõustumine
M1C1–34
Investeering 1.8: Tsiviil- ja
kriminaalkohtute kohtukantseleisse
töölevõtmise kord
Siht Tsiviil- ja kriminaalkohtute
värbamismenetluste algus
M1C1–35 Reform 1.7: Maksukohtute reform Eesmärk Esimese ja teise astme
maksukohtute põhjalik reform
M1C1–36
Reformid 1.4, 1.5 ja 1.6: Tsiviil- ja
kriminaalõiguse reform ning
maksejõuetusreform
Eesmärk
Tsiviil- ja kriminaalõiguse reforme
ning maksejõuetusreformi
käsitlevate delegeeritud õigusaktide
jõustumine
M1C1–57 Reform 1.9: Avaliku halduse reform Eesmärk
Taaste- ja vastupidavusrahastu
rakendamiseks mõeldud
lihtsustamisreformiga seotud
haldusmenetluste jõustumine
M1C1–102 Reform 1.13: Kulude läbivaatamise
raamistiku reform Eesmärk
Valitud haldusasutuste poolt
säästukavade koostamisel ja
rakendamisel kasutatavate tavade
tõhusust käsitleva aruande
vastuvõtmine
439
Järjekorra-
number
Seotud meede (reform või
investeering)
Eesmärk/si
ht Nimetus
M1C1–105 Reform 1.12: Maksuhalduse reform Siht Vastavuskirjade suurem arv
M1C1–106 Reform 1.12: Maksuhalduse reform Siht Valepositiivsete vastavuskirjade
arvu vähendamine
M1C1–107 Reform 1.12: Maksuhalduse reform Siht Vastavuskirjadest tuleneva
maksutulu suurenemine
M1C2–6 Reform 2: Iga-aastased
konkurentsiseadused Eesmärk
2021. aasta konkurentsiseaduse
jõustumine
M1C2–7 Reform 2: Iga-aastased
konkurentsiseadused Eesmärk
Kõigi energiaga seotud
rakendusmeetmete ja teiseste
õigusaktide jõustumine (vajaduse
korral)
M1C2–8 Reform 2: Iga-aastased
konkurentsiseadused Eesmärk
Kõigi rakendusmeetmete (sh
vajaduse korral teiseste õigusaktide)
jõustumine 2021. aasta
konkurentsiseadusest tulenevate
meetmete tõhusaks rakendamiseks
ja kohaldamiseks
M1C3–6 Reform 3.1 – Kultuurisündmuste
minimaalsed keskkonnakriteeriumid Eesmärk
Jõustub dekreet, millega määratakse
kindlaks sotsiaalsed ja
keskkonnakriteeriumid avalikest
vahenditest rahastatavate
kultuuriüritustega seotud
riigihankemenetlustes
M2C1–3
Investeering 2.1: Põllumajandusliku
toidutööstuse, kalanduse ja vesiviljeluse,
metsanduse, lillekasvatuse ja
taimekoolide sektori logistikakava
Eesmärk
Lõpliku paremusjärjestuse
avaldamine loogiliste stiimulite
kava raames
M2C1–4 Investeering 2.2: Põllumajandus-
päikesepark Siht
Vahendite eraldamine
toetusesaajatele protsendina
investeeringule eraldatud rahaliste
vahendite kogusummast
M2C2–8 Investeering 2.1 – Arukate võrkude
tugevdamine Eesmärk
(Kõikide) riigihankelepingute
sõlmimine võrgu läbilaskevõime
suurendamiseks
M2C2–12
Investeering 2.2 – Sekkumised
elektrivõrgu vastupidavuse
suurendamiseks
Eesmärk
Toetuse andmine projektidele, mille
eesmärk on suurendada
elektrisüsteemi võrgu vastupidavust
M3C2–1 Reform 1.1 – Strateegilise planeerimise
menetluste lihtsustamine Eesmärk
Strateegilise planeerimise
menetluste lihtsustamisega seotud
seadusandlike muudatuste
jõustumine
M3C2–2 Reform 1.2 – Kontsessioonilepingute
sõlmimine Itaalia sadamates Eesmärk
Sadamakontsessioone käsitleva
määruse jõustumine
M3C2–4 Reform 1.3 – Külmtriikimistehaste
loamenetluste lihtsustamine Eesmärk
Külmtriikimistehaste loamenetluste
lihtsustamise jõustumine
M4C1–5
Reform 1.3: Koolisüsteemi
ümberkorraldamine; Reform 1.2:
Kolmanda taseme kutseõppesüsteemi
reform; Reform 1.1: Tehniliste ja
kutseinstituutide reform; Reform 1.4:
„Suunitluse“ süsteemi reform
Vahe-
eesmärgid
Alg- ja keskharidussüsteemi
reformide jõustumine
haridustulemuste parandamiseks
M4C1–6 Reform 2.2: Kolmanda taseme haridus ja
jätkuõpe koolijuhtidele, õpetajatele, Eesmärk
Selliste õigusaktide jõustumine,
mille eesmärk on luua kooli jaoks
440
Järjekorra-
number
Seotud meede (reform või
investeering)
Eesmärk/si
ht Nimetus
haldus- ja tehnilistele töötajatele kvaliteetne koolitussüsteem.
M4C2–1 Investeering 1.2: Noorte teadlaste
esitatud projektide rahastamine Siht
Teadusstipendiumi saanud
üliõpilaste arv
M5C1–2 Reform 1 – aktiivsed tööturumeetmed ja
kutseõpe Eesmärk
Kõigi avalike tööturuasutuste
kavade jõustumine piirkondlikul
tasandil
M5C1–6 Investeering 1 – Riiklike tööturuasutuste
tugevdamine Siht
Riiklikud tööturuasutused
rakendavad tugevdamise kavas
kavandatud meetmeid kolme aasta
jooksul (2021–2023).
M5C1–8 Reform 2 – Deklareerimata töö Eesmärk
Riikliku kava ja selle rakendamise
tegevuskava jõustumine, et võidelda
deklareerimata töö vastu kõigis
majandussektorites.
M5C1–12
Investeering 2 – Soolise
võrdõiguslikkuse sertifitseerimise
süsteem
Eesmärk
Soolise võrdõiguslikkuse
sertifitseerimise süsteemi ja sellega
seotud stimuleerimismehhanismide
jõustumine ettevõtjate jaoks
M5C2–7 Investeering 2 – Puuetega inimeste
iseseisvuse mustrid Siht
Sotsiaalpiirkonnad on ellu viinud
vähemalt ühe projekti, mis on
seotud kodude renoveerimise ja/või
puuetega inimestele IKT-seadmete
pakkumisega, millega kaasneb
digioskuste alane koolitus
M5C3–1
Investeering 1.1.1: Sisevaldkonnad –
Kogukonna sotsiaalteenuste ja -taristu
tõhustamine
Eesmärk
Hankemenetluse sõlmimine
sekkumisteks, mille eesmärk on
parandada sotsiaalteenuseid ja -
taristut sisepiirkondades ning
toetada apteeke alla 3 000 elanikuga
omavalitsusüksustes
M6C2–1
Reform 1: Vaadata läbi ja ajakohastada
haiglaravi ja hoolduse teadusinstituutide
(IRCCS) praegune õigusraamistik ning
tervishoiuministeeriumi teaduspoliitika,
et tugevdada teadusuuringute,
innovatsiooni ja tervishoiu vahelist seost
Eesmärk
Haiglaravi ja hoolduse
teadusinstituute (IRCSS)
reguleerivate eeskirjade
ümberkorraldamist käsitleva
seadusandliku dekreedi jõustumine
Osamakse
summa 11 494 252 874 EUROT
1.4. Neljas osamakse (tagastamatu toetus):
Järjekorra-
number
Seotud meede (reform või
investeering)
Eesmärk/si
ht Nimetus
M1C1–11 Investeering 1.6.6: Finantspolitsei
digiteerimine Siht
Finantspolitsei – erialaste
andmeteadusteenuste ostmine T1
M1C1–72
Reform 1.11: Riigiasutuste ja
tervishoiuasutuste hilinenud maksete
vähendamine
Eesmärk
Kiidetakse heaks meetmed
riigiasutuste poolt ettevõtetele
tehtavate hilinenud maksete
vähendamiseks
M1C1–73 Reform 1.10: Riigihangete Eesmärk Riigihangete seadustiku reformi
441
Järjekorra-
number
Seotud meede (reform või
investeering)
Eesmärk/si
ht Nimetus
õigusraamistiku reform jõustumine
M2C2–14 Investeering 3.3 – Vesinikukatsed
maanteetranspordis Eesmärk
(Kõigi) riigihankelepingute
sõlmimine vesinikul põhinevate
laadimisjaamade arendamiseks
M2C2–16 Investeering 3.4 Vesinikukatsed
raudteetranspordi valdkonnas Eesmärk
Vahendite eraldamine vesiniku
katsetamiseks raudteetranspordi
valdkonnas
M2C2–20
Reform 3 „Halduskorra lihtsustamine ja
vesiniku kasutuselevõttu takistavate
regulatiivsete tõkete vähendamine“
Eesmärk Vajalike seadusandlike meetmete
jõustumine
M5C2–3
Reform 2 – reform seoses eakate
inimestega, kes ei suuda end ise ülal
pidada
Eesmärk
Sellise raamseaduse jõustumine,
millega tugevdatakse meetmeid,
mille eesmärk on toetada vanemaid
inimesi, kes ei suuda end ise ülal
pidada
M1C1–37 Reformid 1.4 ja 1.5: Tsiviil- ja
kriminaalõiguse reform Eesmärk
Tsiviil- ja kriminaalõiguse reformi
jõustumine
M1C1–58 Reform 1.9: Avaliku halduse reform Eesmärk Avaliku sektori tööhõive reformi
käsitlevate õigusaktide jõustumine
M1C1–74 Reform 1.10: Riigihangete
õigusraamistiku reform Eesmärk
Riigihankeseadustiku lihtsustamise
reformi kõigi vajalike
rakendusmeetmete ja teiseste
õigusaktide jõustumine
M1C1–109 Reform 1.12: Maksuhalduse reform Siht
Esimeste eeltäidetud
käibemaksudeklaratsioonide
saatmine
M2C2–27 Investeering 4.3 Laadimistaristu
paigaldamine Eesmärk
Kõigi riigihankelepingute
sõlmimine laadimistaristute
paigaldamiseks M1
M2C2–33
Investeering 4.4.2: Piirkondliku
ühistranspordi raudteepargi tugevdamine
heitevabade rongide ja universaalteenuse
abil
Eesmärk
Kõigi riigihankelepingute
sõlmimine piirkondliku
ühistranspordi raudteepargi
tugevdamiseks heitevabade
rongidega ja universaalteenuse
osutamiseks
M2C3–2 Investeering 2.1 – Energiatõhususe
ökoboonuse tugevdamine Siht
Hoonete renoveerimine Superbonus
T1
M4C1–9
Investeering 1.1: Lasteaedu, eelkoole
ning alusharidust ja lastehoiuteenuseid
käsitlev kava
Eesmärk
Lasteaedade ja eelkoolide ning
alushariduse ja lastehoiuteenuste
ehitamist, renoveerimist ja nende
turvalisuse tagamist käsitlevate
lepingute sõlmimine
M5C3–8
Investeering 1.3: Struktureeritud sotsiaal-
haridusmeetmed haridusvaesuse vastu
võitlemiseks lõunas, millega toetatakse
kolmandat sektorit
Siht Alaealistele mõeldud haridustoetus
(esimene osa)
Osamakse
summa 2 315 646 882 EUROT
442
1.5. Viies osamakse (tagastamatu toetus):
Järjekorra-
number
Seotud meede (reform või
investeering)
Eesmärk/si
ht Nimetus
M1C2–4 Reform 1: Tööstusomandi süsteemi
reform Eesmärk
Seadusandliku dekreedi jõustumine,
mille eesmärk on reformida Itaalia
tööstusomandi seadustikku, ja
asjaomased rakendusaktid
M1C3–4
Investeeringud – 1.3 Energiatõhususe
parandamine kinodes, teatrites ja
muuseumides
Siht
Lõpule viidud sekkumised
riigimuuseumide ja
kultuuriobjektide, teatrisaalide ja
kinode osas (esimene osa)
M1C1–12 Investeering 1.3.2: Ühtne digivärav Siht Ühtne digivärav
M1C1–13 Investeering 1.4.6: Liikuvus kui Itaalia
teenus Eesmärk Liikuvus kui teenuselahendused M1
M1C1–38 Reform 1.8: Õigusemõistmise digipööre Eesmärk Kohtusüsteemi digitaliseerimine
M1C1–59 Reform 1.9: Avaliku halduse reform Eesmärk Strateegilise personalijuhtimise
jõustumine avalikus halduses
M1C1–
73quater
Reform 1.10: Riigihangete
õigusraamistiku reform Eesmärk
ELi piirmäärast allapoole jäävaid
hankeid käsitlevate suuniste
jõustumine
M1C1–75 Reform 1.10: Riigihangete
õigusraamistiku reform Eesmärk
Riikliku e-riigihangete süsteemi
täielik toimimine
M1C1–84 Reform 1.10: Riigihangete
õigusraamistiku reform Siht
Avaldamise ja lepingu sõlmimise
vaheline keskmine aeg
M1C1–86 Reform 1.10: Riigihangete
õigusraamistiku reform Siht
Avaliku sektori hankijate
kutseliseks muutmise strateegia
raames koolitatud ametnikud
M1C1–87 Reform 1.10: Riigihangete
õigusraamistiku reform Siht
Dünaamilisi hankesüsteeme
kasutavad avaliku sektori hankijad
M1C1–110 Reform 1.13: Kulude läbivaatamise
raamistiku reform Eesmärk
Riigieelarve ümberliigitamine
keskkonnakulutuste ja soolist
võrdõiguslikkust edendavate
kulutuste alusel
M1C2–9 Reform 2: Iga-aastased
konkurentsiseadused Eesmärk
2022. aasta konkurentsiseaduse
jõustumine
M1C2–10 Reform 2: Iga-aastased
konkurentsiseadused Eesmärk
Kõigi rakendusmeetmete (sh
vajaduse korral teiseste
õigusaktide) jõustumine 2022. aasta
konkurentsiseadusest tulenevate
meetmete tõhusaks rakendamiseks
ja kohaldamiseks
M1C3–7
Investeeringud – 3.3 Kultuurivaldkonnas
tegutsejate suutlikkuse suurendamine
digi- ja rohepöörde juhtimiseks.
Eesmärk
Kõigi selliste riigihankelepingute
sõlmimine
rakendusorganisatsiooni/toetusesaaj
atega, mis on seotud
kultuurivaldkonnas tegutsejate digi-
ja rohepöörde juhtimisega
M2C1–5 Investeering 2.2: Põllumajandus-
päikesepark Siht
Vahendite eraldamine
toetusesaajatele protsendina
investeeringule eraldatud rahaliste
vahendite kogusummast
M2C2–22 Investeering 4.1 – Investeeringud Siht: Jalgrattateed T1
443
Järjekorra-
number
Seotud meede (reform või
investeering)
Eesmärk/si
ht Nimetus
pehmesse liikuvusse (riiklik
jalgrattateede kava)
M4C1–10
Reform 2.1: Õpetajate töölevõtmine;
Reform 1.3: Koolisüsteemi
ümberkorraldamine; Reform 1.2:
Kolmanda taseme kutseõppesüsteemi
reform; Reform 1.4: „Suunamise“
süsteemi reform; Reform 1.5: Ülikooli
kraadiõppe rühmade reform; Reform 1.6:
Ülikoolikraadide reformi võimaldamine
Eesmärk
Määruste jõustumine kõigi põhi-,
kesk- ja kolmanda taseme hariduse
reforme käsitlevate meetmete
tõhusaks rakendamiseks ja
kohaldamiseks, kui see on vajalik
M4C1–11 Investeering 1.7: Stipendiumid ülikooli
pääsemiseks Siht Ülikoolistipendium
M5C3–3 Investeering 2: Territoriaalse lähedusega
tervishoiuasutused Siht
Toetus maapiirkondade apteekidele
alla 5 000 elanikuga
omavalitsusüksustes, külades või
asulates (esimene partii)
M1C1–113 Reform 1.12: Maksuhalduse reform Siht Vastavuskirjade suurem arv
M1C1–114 Reform 1.12: Maksuhalduse reform Siht Vastavuskirjadest tuleneva
maksutulu suurenemine
Osamakse
summa 3 621 492 701 EUROT
1.6. Kuues osamakse (tagastamatu toetus):
Järjekorra-
number
Seotud meede (reform või
investeering)
Eesmärk/si
ht Nimetus
M1C1–14a
Reform 1.9a: Reform
ühtekuuluvuspoliitika rakendamise
kiirendamiseks
Eesmärk
Ühtekuuluvuspoliitika rakendamise
kiirendamist käsitlevate siseriiklike
õigusaktide jõustumine
M1C1–15 Investeering 1.6.6: Finantspolitsei
digiteerimine Siht
Finantspolitsei – erialaste
andmeteadusteenuste ostmine T2
M1C1–37a Reform 1.4: Tsiviilõiguse reform Eesmärk Kuhjumise vähendamise meetmete
jõustumine
M1C1–72a
Reform 1.11: Riigiasutuste ja
tervishoiuasutuste hilinenud maksete
vähendamine
Eesmärk
Seadusandlikud ja erimeetmed
hilinenud maksete vähendamiseks
kesk-/kohalikul tasandil
M1C1–85 Reform 1.10: Riigihangete
õigusraamistiku reform Siht
Keskmine aeg lepingu sõlmimise ja
taristu rajamise vahel
M1C1–99 Reform 1.10: Riigihangete
õigusraamistiku reform Siht
Dünaamilisi hankesüsteeme
kasutavad avaliku sektori hankijad
M2C2–6
Reform 1 „Taastuvenergia maismaa- ja
avamerejaamadele loa andmise
menetluste lihtsustamine ning uus
õigusraamistik taastuvatest
energiaallikatest tootmise säilitamiseks
ning praeguste toetuskavade ajaline
pikendamine ja rahastamiskõlblikkuse
pikendamine“
Eesmärk
Maismaa ja avamere taastuvenergia
rajatiste ehitamiseks loa andmise
menetluste lihtsustamise
õigusraamistiku jõustumine
444
Järjekorra-
number
Seotud meede (reform või
investeering)
Eesmärk/si
ht Nimetus
M4C1–8 Investeering 1.3: Koolispordi
infrastruktuuri parandamise kava Eesmärk
Lepingute sõlmimine sekkumisteks
koolis kasutatavate spordirajatiste ja
võimlate ehitamiseks ja
renoveerimiseks
M5C1–9 Reform 2 – Deklareerimata töö Eesmärk Võtta meetmeid deklareerimata töö
vastu võitlemiseks
M5C2–4 Reform 2 – reform, mis käsitleb
mittesõltumatuid eakaid inimesi Eesmärk
Selliste seadusandlike dekreetide
jõustumine, millega arendatakse
edasi raamseaduse sätteid, et
tugevdada meetmeid eakate inimeste
toetamiseks, kes ei suuda end ise ülal
pidada
M7–9 Reform 5: Uute oskuste kava – Üleminek Eesmärk
Uue oskuste kava (üleminekud) ja
rakendamise tegevuskava
vastuvõtmine ja avaldamine
M7–32
Investeering 12 „Rahastamisvahend
rahvusvahelise juhtpositsiooni
arendamiseks tööstuses ning teadus- ja
arendustegevuses heiteta busside
valdkonnas“
Eesmärk Rakenduskokkulepe.
M1C1–39 Investeering 1.8: Tsiviil- ja
kriminaalkohtute värbamismenetlused Siht
Taaste- ja vastupidavuskava
rakendamise eest vastutavate
justiitsministeeriumi tsiviil- ja
kriminaalkohtute ning territoriaalsete
ja kesktalituste värbamismenetluste
lõpuleviimine
M1C1–40 Investeering 1.8: Halduskohtute
värbamismenetlused Siht
Halduskohtute värbamismenetluste
lõpuleviimine
M1C1–41 Investeering 1.8: Halduskohtute
värbamismenetlused Siht
Liidumaade halduskohtute kuhjunud
kohtuasjade arvu vähendamine
M1C1–42 Investeering 1.8: Halduskohtute
värbamismenetlused Siht
Riiginõukogu kohtuasjade
kuhjumise vähendamine
M1C1–59A Reform 1.9: Avaliku halduse reform Eesmärk Strateegilise personalijuhtimise
rakendamine avalikus halduses
M1C1–73a Reform 1.10: Riigihangete
õigusraamistiku reform Eesmärk
Ringkirja vastuvõtmine, milles
antakse avaliku sektori hankijatele
suuniseid kvalifitseerimissüsteemi
kohta
M1C1–108 Reform 1.15: Avaliku sektori
raamatupidamiseeskirjade reform Eesmärk
Kontseptuaalse raamistiku,
tekkepõhise
raamatupidamisarvestuse standardite
kogumi ja mitmemõõtmelise
kontoplaani heakskiitmine
M1C1–111 Reform 1.13: Kulude läbivaatamise
raamistiku reform Eesmärk
2023. aasta kulude läbivaatamise
lõpuleviimine seoses 2022. aastal
2023. aastaks seatud
säästueesmärgiga
M1C1–112 Reform 1.12: Maksuhalduse reform Siht
Parandada maksuhalduri
tegevussuutlikkust kooskõlas
maksuameti 2021.–2023. aasta
tulemuslikkuse kavas esitatud
värbamiseesmärkidega
M1C2–2 Investeering 1: Üleminek 4.0 Siht Üleminekuperioodi 4.0
445
Järjekorra-
number
Seotud meede (reform või
investeering)
Eesmärk/si
ht Nimetus
maksusoodustused, mida antakse
ettevõtetele 2021.–2022. aastal
esitatud maksudeklaratsioonide
alusel
M1C3–9 Investeering 4.1 – Digiturismi keskus Siht Turismiettevõtjate kaasamine
digitaalse turismi keskusse
M1C3–10 Reform 4.1 – giidikutsete tellimise
reguleerimine. Eesmärk
Giidide suhtes kohaldatava riikliku
standardi määratlemine
M2C1–6 Investeering 2.2: Põllumajandus-
päikesepark Siht
Vahendite eraldamine
toetusesaajatele protsendina
investeeringule eraldatud rahaliste
vahendite kogusummast
M3C2–5 Investeering 2.1 – Logistikaahela
digitaliseerimine Siht Logistikaahela digiteerimine
M5C2–2 Reform 1 – puuetega inimesi käsitlev
raamseadus Eesmärk
Jõustuvad seadusandlikud dekreedid,
millega arendatakse edasi
raamseaduse sätteid, et tugevdada
puuetega inimeste autonoomiat
Osamakse
summa 2 053 579 667 EUROT
1.7. Seitsmes osamakse (tagastamatu toetus):
Järjekorra-
number
Seotud meede (reform või
investeering)
Eesmärk/si
ht Nimetus
M1C1–17 Investeering 1.1: Digitaristu Siht Migratsioon Polo Strategico
Nazionalesse T1
M7–7 Reform 4: Taastuvelektri ostulepingutega
seotud finantsriskide maandamine Eesmärk
Esmaste ja teiseste õigusaktide
jõustumine
M7–14 Investeering 4: Türreeni ühendus Eesmärk Lepingute sõlmimine
M3C2–7 Investeering 2.3: Külmtriikimine Eesmärk Kõigi riigihankelepingute
sõlmimine
M1C1–18 Investeering 1.3.1: Riiklik digitaalne
andmeplatvorm Siht
Rakendusliidesed riiklikul
digitaalsel andmeplatvormil T1
M1C1–19 Investeering 1.5: Küberturvalisuseni Siht Toetus T2 turvastruktuuride
ajakohastamiseks
M1C1–20 Investeering 1.5: Küberturvalisuseni Eesmärk Riiklike küberturvalisuse teenuste
täielik kasutuselevõtt
M1C1–21 Investeering 1.5: Küberturvalisuseni Eesmärk
Küberturvalisuse kontrolli- ja
sertifitseerimislaborite võrgustiku
ja hindamiskeskuste
väljakujundamine
M1C1–22 Investeering 1.5: Küberturvalisuseni Eesmärk
PSNC ja võrgu- ja infoturbe
turvameetmete auditi kesküksuse
täielik toimimine, kusjuures lõpule
on viidud vähemalt 30 kontrolli
M1C1–43 Reform 1.4: Tsiviilõiguse reform Siht Tsiviilkohtute (esimene aste)
kuhjunud kohtuasjade vähendamine
M1C1–44 Reform 1.4: Tsiviilõiguse reform Siht Kohtuasjade kuhjumise
vähendamine
446
Järjekorra-
number
Seotud meede (reform või
investeering)
Eesmärk/si
ht Nimetus
tsiviilapellatsioonikohtus (teine
aste)
M1C1–60 Reform 1.9: Avaliku halduse reform Siht
200 kodanikke ja ettevõtjaid
mõjutava kriitilise tähtsusega
menetluse lihtsustamine ja/või
digitaliseerimine
M1C1–72b
Reform 1.11: Riigiasutuste ja
tervishoiuasutuste hilinenud maksete
vähendamine
Eesmärk Suurendada maksetega tegelevaid
inimressursse
M1C1–
72quater
Reform 1.11: Riigiasutuste ja
tervishoiuasutuste hilinenud maksete
vähendamine
Eesmärk Tegevuskava vastuvõtmine
M1C1–73b Reform 1.10: Riigihangete
õigusraamistiku reform Eesmärk
Stiimulid avaliku sektori hankijate
kvalifitseerimiseks ja kutseliseks
muutmiseks.
M1C1–
73nquies
Reform 1.10: Riigihangete
õigusraamistiku reform Eesmärk
Projektide rahastamist käsitlevate
uute õigusnormide jõustumine
M1C1–75a Investeering 1.10: Kvalifikatsiooni ja e-
riigihangete toetamine Eesmärk
Kvalifikatsiooni ja e-riigihangete
toetamine
M1C1–84a Reform 1.10: Riigihangete
õigusraamistiku reform Eesmärk
Meetmed, mille eesmärk on
kiirendada otsuste tegemist avaliku
sektori hankijatega lepingute
sõlmimisel
M1C1–98 Reform 1.10: Riigihangete
õigusraamistiku reform Siht
Avaliku sektori hankijate
kutseliseks muutmise strateegia
raames koolitatud ametnikud
M1C2–11 Reform 2: Iga-aastased
konkurentsiseadused Eesmärk
2023. aasta konkurentsiseaduse
jõustumine
M1C2–12 Reform 2: Iga-aastased
konkurentsiseadused Eesmärk
2023. aasta konkurentsiseaduses ja muudes esmastes õigusaktides
sätestatud meetmete rakendamiseks
ja kohaldamiseks vajalike
rakendusmeetmete (sealhulgas
vajaduse korral teiseste
õigusaktide) jõustumine
M2C1–6a Investeering 2.2: Põllumajandus-
päikesepark Siht
Vahendite eraldamine
toetusesaajatele protsendina
investeeringule eraldatud rahaliste
vahendite kogusummast
M2C1–7
Investeering 2.3: Innovatsioon ja
mehhaniseerimine põllumajandus- ja
toidusektoris
Siht
Lõplike pingeridade avaldamine
koos lõplike vahendite saajate
identifitseerimisega.
M2C2–28 Investeering 4.3 Laadimistaristu
paigaldamine Eesmärk
Riigihankelepingute sõlmimine
laadimistaristute paigaldamiseks
M4C1–12
Investeering 4.1: Doktorikraadide arvu ja
karjäärivõimaluste suurendamine
(teadusuuringutele orienteeritud, avalik
haldus ja kultuuripärand)
Siht
Doktoriõppe
stipendiumiprogrammid aastas
(kolme aasta jooksul)
M4C1–14 Reform 2.1: Õpetajate värbamine Siht Reformitud värbamissüsteemiga
tööle võetud õpetajad
M4C1–15 Investeering 1.7: Stipendiumid ülikooli
pääsemiseks Siht
Ülikooli pääsemiseks antavad
stipendiumid
447
Järjekorra-
number
Seotud meede (reform või
investeering)
Eesmärk/si
ht Nimetus
M4C2–3
Investeering 3.3: Doktoriõppe
stipendiumide andmine koostöös
ettevõtetega ja teadlaste töölevõtmise
edendamine ettevõtetes
Siht Doktoriõppe stipendiumide arv
M5C1–15a Investeering 4 – Universaalne avalik
teenistus Eesmärk
Võtta meetmeid noorte osaluse
suurendamiseks, menetluste
lihtsustamiseks ja üldise avaliku
teenistuse projektide kvaliteedi
parandamiseks;
M7–1 Reform 1: Taastuvenergia loamenetluste
lihtsustamine Eesmärk
„Taastuvenergia eelisarendusalade“
kindlaksmääramine
M7–4 Reform 2: Keskkonnakahjulike toetuste
vähendamine Eesmärk
Võetakse vastu valitsuse aruanne,
milles esitatakse
keskkonnakahjulike toetuste
vähendamise tegevuskava
kindlaksmääramiseks
sidusrühmadega peetud valitsuse
konsultatsioonide tulemused.
M7–16 Investeering 5: SA.CO.I.3 Eesmärk Lepingute sõlmimine
M4C1–10 bis Reform 1.1: Tehnika- ja kutseinstituutide
reform Eesmärk Teiseste õigusaktide jõustumine.
Osamakse
summa 5 294 563 760 EUROT
1.8. Kaheksas osamakse (tagastamatu toetus):
Järjekorra-
number
Seotud meede (reform või
investeering)
Eesmärk/si
ht Nimetus
M1C1–23 Investeering 1.4.6: Liikuvus kui Itaalia
teenus Eesmärk Seitsme katseprojekti rakendamine
M1C1–76
Reform 1.11: Riigiasutuste ja
tervishoiuasutuste hilinenud maksete
vähendamine
Siht
Vähendatakse keskmist päevade
arvu, mille jooksul avaliku sektori
keskasutused peavad ettevõtjatele
makse maksma
M1C1–77
Reform 1.11: Riigiasutuste ja
tervishoiuasutuste hilinenud maksete
vähendamine
Siht
Piirkondlike ametiasutuste
keskmine päevade arv, mille
jooksul nad maksavad ettevõtjatele,
on väiksem
M1C1–78
Reform 1.11: Riigiasutuste ja
tervishoiuasutuste hilinenud maksete
vähendamine
Siht
Kohalike ametiasutuste keskmine
päevade arv, mille jooksul nad
maksavad ettevõtjatele, on väiksem
M1C1–79
Reform 1.11: Riigiasutuste ja
tervishoiuasutuste hilinenud maksete
vähendamine
Siht
Vähendatakse keskmist päevade
arvu, mille jooksul riiklikud
tervishoiuasutused peavad
ettevõtetele maksma
M1C1–25 Investeering 1.6.6: Finantspolitsei
digiteerimine Eesmärk
Arendada majanduskuritegevuse
vastu võitlemiseks kasutatavaid
infosüsteeme
M1C1–62 Reform 1.9: Avaliku halduse reform Eesmärk Suurendada investeeringute
448
Järjekorra-
number
Seotud meede (reform või
investeering)
Eesmärk/si
ht Nimetus
kasutamist
M1C1–115 Reform 1.13: Kulude läbivaatamise
raamistiku reform Eesmärk
2024. aasta kulude läbivaatamise
lõpuleviimine seoses 2022. ja 2023.
aastal 2024. aastaks seatud
säästueesmärgiga
M1C2–3 Investeering 1: Üleminek 4.0 Siht
Üleminekuperioodi 4.0
maksusoodustused, mida antakse
ettevõtetele 2021.–2023. aastal
esitatud maksudeklaratsioonide
alusel
M4C1–16 Investeering 3.1: Uued oskused ja uued
keeled Eesmärk
Teaduse, tehnoloogia, inseneeria ja
matemaatika (STEM) projektide
aktiveerimiseks toetuse andmise
otsuse(te) vastuvõtmine
M4C1–17 Investeering 3.1: Uued oskused ja uued
keeled Eesmärk Uued oskused
M4C2–1 bis Investeering 1.2: Noorte teadlaste
esitatud projektide rahastamine Eesmärk
Noortele teadlastele toetuse
andmist käsitleva(te) määruse(te)
avaldamine
M6C2–2 Investeering 2.1: NHSi biomeditsiiniliste
uuringute tugevdamine ja tõhustamine Siht
Kontseptsiooni tõestamise ning
harvaesinevate vähivormide ja
haiguste valdkonnas rahastatud
teadusprojektid
M6C2–3 Investeering 2.1: NHSi biomeditsiiniliste
uuringute tugevdamine ja tõhustamine Siht
Suure tervisemõjuga haigustega
seotud teadusprojektid
M7–2 Reform 1: Taastuvenergia loamenetluste
lihtsustamine Eesmärk Õigusakti (Testo Unico) jõustumine
M7–25
Investeering 8: Kriitilise tähtsusega
toorainete kestlik, ringluspõhine ja
turvaline tarnimine
Eesmärk
Aruande avaldamine kriitilise
tähtsusega toorainete tulevaste
vajaduste ja ökodisaini potentsiaali
kohta
M1C2–14a Reform 3: Ettevõtete stiimulite
ratsionaliseerimine ja lihtsustamine. Eesmärk
Aruande avaldamine, milles
hinnatakse kõiki ettevõtetele
suunatud stiimuleid
M5C1–15 Investeering 3 – duaalse süsteemi
tugevdamine Siht
Duaalse haridussüsteemi kaudu
välja antud tunnistused
M2C1–12 Investeering 3.3: Kultuur ja teadlikkus
keskkonnateemadest ja -probleemidest Siht
Netisaated keskkonnaalase
ülemineku kohta
M4C1–19
Investeering 3.2: Kool 4.0: innovaatilised
koolid, juhtmestik, uued klassiruumid ja
õpikojad
Eesmärk
Digiseadmete ostmiseks ja/või
digilaborite loomiseks toetuse
andmise otsuse(te) vastuvõtmine
M1C1–98a Reform 1.10: Riigihangete
õigusraamistiku reform Siht
Avaliku sektori hankijate
kutseliseks muutmise strateegia
raames koolitatud ametnikud
Osamakse
summa 3 541 589 877 EUROT
449
1.9. Üheksas osamakse (tagastamatu toetus):
Järjekorra-
number
Seotud meede (reform või
investeering)
Eesmärk/si
ht Nimetus
M4C1–7
Investeering 1.4: Erakorraline
sekkumine, mille eesmärk on vähendada
territoriaalseid erinevusi keskkooli I ja II
õppetsüklis ning võidelda koolist
väljalangemise vastu
Siht
Üliõpilased või noored, kes on
osalenud mentorlustegevuses või
koolituskursustel
M4C1–14a Reform 2.1: Õpetajate värbamine Siht Reformitud värbamissüsteemi
raames värvatud õpetajad
M7–6 Reform 3: Biometaani gaasivõrguga
liitumise kulude vähendamine Eesmärk
Selliste õigusaktide jõustumine,
millega vähendatakse biometaani
tootvate jaamade gaasivõrguga
liitumise kulusid
M7–10 Reform 5: Uute oskuste kava – Üleminek Eesmärk
Õigusakti(de) jõustumine
piirkondade ja autonoomse(te)
provintsi(de) jaoks
M1C1–24 Investeering 1.7.1: Digitaalne avalik
teenistus Siht
Üksikisikud osalesid digitaalses
avalikus teenistuses
M1C1–49 Investeering 1.8: Halduskohtute
värbamismenetlused Siht
Liidumaade halduskohtute
kohtuasjade kuhjumise
vähendamine (esimene aste)
M1C1–50 Investeering 1.8: Halduskohtute
värbamismenetlused Siht
Riiginõukogu kohtuasjade
kuhjumise vähendamine
M1C1–96 Reform 1.10: Riigihangete
õigusraamistiku reform Siht
Pakkumuste esitamise ja lepingu
sõlmimise vaheline keskmine aeg
M1C1–116 Reform 1.12: Maksuhalduse reform Siht
Maksudest kõrvalehoidumise
vähendamine, nagu on määratletud
näitajaga „Kindlustus maksudest
kõrvale hoiduda“
M1C2–5 Investeering 6: Investeeringud
tööstusomandi süsteemi Siht
Lõpparuande esitamine vähemalt
254 tööstusomandi ja
teadusuuringutega seotud projekti
kohta
M1C2–13 Reform 2: Iga-aastased
konkurentsiseadused Eesmärk
2025. aasta konkurentsiseaduse
jõustumine
M1C2–14 Reform 2: Iga-aastased
konkurentsiseadused Siht
Paigaldatud on miljoneid 2G
nutiarvesteid
M1C3–2 Investeeringud – 1.1 Kultuuripärandi
digistrateegia ja -platvormid Siht Avaldatud digi- ja meediaressursid
M1C3–5
Investeeringud – 1.3 Energiatõhususe
parandamine kinodes, teatrites ja
muuseumides
Siht
Riigimuuseumide ja
kultuuriobjektide, teatrisaalide ja
kinodega seotud sekkumised on
lõpule viidud (teine osa)
M2C3–3 Investeering 2.1 – Energiatõhususe
ökoboonuse tugevdamine Siht
Hoonete renoveerimine Superbonus
T2
M4C1–13
Investeering 2.1: Integreeritud digitaalne
õpetamine ja koolitöötajate koolitamine
digiülemineku teemal;
Siht Koolijuhtide, õpetajate ja
haldustöötajate koolitamine
M4C2–2bis Investeering 2.2a: Innovatsioonilepingud Siht
Innovatsioonilepingud, mille puhul
ettevõtjate ja Itaalias valmistatud
toodete ministeerium on kinnitanud,
450
Järjekorra-
number
Seotud meede (reform või
investeering)
Eesmärk/si
ht Nimetus
et toetusesaajad on lõpparuannete
edastamisega nõus
M5C1–3 Reform 1 – aktiivsed tööturumeetmed ja
kutseõpe Siht
Inimesed, kes saavad kasu töötajate
garanteeritud tööalase
konkurentsivõime programmist
(GOL)
M5C1–4 Reform 1 – aktiivsed tööturumeetmed ja
kutseõpe Siht
Inimesed osalesid
koolitusprogrammides
M5C1–7 Investeering 1 – Riiklike tööturuasutuste
tugevdamine Siht
Riiklikud tööturuasutused on viinud
lõpule tugevdamise kavas
kavandatud tegevused
M5C1–10 Reform 2 – deklareerimata töö vastu
võitlemise riiklik kava Siht
Tööinspektsioonide arvu
suurenemine ja võrgustiku „rete del
lavoro agricolo di qualità“
liikmesus
M5C3–9
Investeering 1.3: Struktureeritud sotsiaal-
haridusmeetmed haridusvaesuse vastu
võitlemiseks lõunas, millega toetatakse
kolmandat sektorit
Siht Hariduslik tugi alaealistele (teine
rühm)
M7–5 Reform 2: Keskkonnakahjulike toetuste
vähendamine Eesmärk Õigusakti(de) jõustumine
M7–26
Investeering 8: Kriitilise tähtsusega
toorainete kestlik, ringluspõhine ja
turvaline tarnimine
Eesmärk Geograafilise informatsiooni
süsteemi veebiplatvorm
M1C1–38a Reform 1.8: Õigusemõistmise digipööre Eesmärk Kohtusüsteemi digitaliseerimine
M1C1–
72quinquies
Reform 1.11: Riigiasutuste ja
tervishoiuasutuste hilinenud maksete
vähendamine
Eesmärk
Avaliku halduse asutuste tehtud
makseid käsitleva teabe ja andmete
avaldamine
M1C1–
72soolised
Reform 1.11: Riigiasutuste ja
tervishoiuasutuste hilinenud maksete
vähendamine
Eesmärk Auditikava lõplik auditiaruanne
M1C1–27 Investeering 1.3.1: Riiklik digitaalne
andmeplatvorm Siht
Rakendusliidesed riiklikul
digitaalsel andmeplatvormil T2
M1C1–97b
Reform 1.10: Riigihangete
õigusraamistiku reform Eesmärk
Täitmise kiiruse parandamise
meetmed
M4C2–4bis
Reform 1.2: Teadusuuringute
rahastamise kolmeaastane kava Eesmärk
Esmased õigusaktid
teadusuuringute rahastamise
kolmeaastase kava vastuvõtmiseks
M7–30
Investeering 10: Oskuste katseprojekt
„Crescere Green“ Siht Koolitustunnistused
M1C1–144
Investeering 1.4.2 – Kodanike kaasamine
– digitaalsete avalike
teenuste/sekkumiste juurdepääsetavuse
parandamine
Siht
Digitaalsete avalike
teenuste/sekkumiste parem
kättesaadavus
M2C2–36
Investeering 4.4.3: Riikliku tuletõrje
juhtimise alla kuuluva laevastiku
uuendamine
Siht
Keskkonnasõbralike sõidukite arv
riikliku tuletõrjemeeskonna
koosseisu uuendamiseks
M2C4–32
Investeering 4.2. Veejaotusvõrkude
kadude vähendamine, sealhulgas Eesmärk Ringkond veejaotusvõrkudes
451
Järjekorra-
number
Seotud meede (reform või
investeering)
Eesmärk/si
ht Nimetus
võrkude digiteerimine ja seire
M1C1–153
Investeering 1.6.2 – Justiitsministeeriumi
digitaliseerimine Siht Digiteeritud kohtutoimikud T2
M6C2–17
Investeering 2.2: Tervishoiusüsteemi
spetsialistide tehniliste, kutsealaste, digi-
ja juhtimisoskuste arendamine
Siht Meditsiinilise abi andmine
erikoolituse lepingud
Osamakse
summa 7 670 089 282 EUROT
1.10. Kümnes osamakse (tagastamatu toetus):
Järjekorra-
number
Seotud meede (reform või
investeering) Eesmärk/siht Nimetus
M1C1–88
Reform 1.11: Riigiasutuste ja
tervishoiuasutuste hilinenud maksete
vähendamine
Siht
Vähendatakse keskmist päevade
arvu, mille jooksul avaliku sektori
keskasutused peavad ettevõtjatele
makse maksma
M1C1–89
Reform 1.11: Riigiasutuste ja
tervishoiuasutuste hilinenud maksete
vähendamine
Siht
Piirkondlike ametiasutuste
keskmine päevade arv, mille jooksul
nad maksavad ettevõtjatele, on
väiksem
M1C1–90
Reform 1.11: Riigiasutuste ja
tervishoiuasutuste hilinenud maksete
vähendamine
Siht
Kohalike ametiasutuste keskmine
päevade arv, mille jooksul nad
maksavad ettevõtjatele, on väiksem
M1C1–91
Reform 1.11: Riigiasutuste ja
tervishoiuasutuste hilinenud maksete
vähendamine
Siht
Vähendatakse keskmist päevade
arvu, mille jooksul riiklikud
tervishoiuasutused maksavad
ettevõtjatele
M1C1–117 Reform 1.15: Avaliku sektori
raamatupidamiseeskirjade reform Siht
Uue tekkepõhise
raamatupidamissüsteemi alase
koolituse läbinud avaliku sektori
asutuste esindajad
M1C1–119 Reform 1.14: Riigi tasandist madalama
tasandi eelarveraamistiku reform Eesmärk
Piirkondliku fiskaalföderalismi
parameetrite määratlemine
M1C1–120 Reform 1.14: Riigi tasandist madalama
tasandi eelarveraamistiku reform Eesmärk
Provintside ja suurlinnade
fiskaalföderalismi määratlevate
õigusaktide jõustumine.
M5C1–11 Reform 2 – Deklareerimata töö Eesmärk Võtta meetmeid deklareerimata töö
vastu võitlemiseks
M3C2–12 Investeering 2.3: Külmtriikimine Siht
Tööde lõpuleviimine ja
ühenduskulude prognooside
aktsepteerimine arendaja poolt
külmtriikimise taristute puhul
M1C1–28 Investeering 1.7.2: Digitaalsete
lihtsustusteenuste võrgustik Siht
Digiõppe hõlbustamise keskuste
pakutavates digiõppe ja/või -
hõlbustusalgatustes osalevate
kodanike arv
452
Järjekorra-
number
Seotud meede (reform või
investeering) Eesmärk/siht Nimetus
M1C1–45 Reform 1.4: Tsiviilõiguse reform Eesmärk Tsiviilkohtumenetluse kestuse
lühendamine
M1C1–46 Reform 1.5: Kriminaalõiguse reform Eesmärk Kriminaalmenetluse kestuse
lühendamine
M1C1–47 Reform 1.4: Tsiviilõiguse reform Siht
Tsiviilkohtute kohtuasjade
kuhjumise vähendamine (esimene
aste)
M1C1–48 Reform 1.4: Tsiviilõiguse reform Siht
Kohtuasjade kuhjumise
vähendamine
tsiviilapellatsioonikohtus (teine
aste)
M1C1–59b Reform 1.9: Avaliku halduse reform Eesmärk Strateegilise personalijuhtimise
rakendamine avalikus halduses
M1C1–63 Reform 1.9: Avaliku halduse reform Eesmärk Lihtsustatud ja/või digiteeritud
menetluste andmekogu avaldamine
M1C1–66
Investeering 1.9: Anda tehnilist abi ja
tugevdada suutlikkuse suurendamist
Itaalia taaste- ja vastupidavuskava
rakendamiseks
Siht Syllabusi platvormil osalemise
aruanded
M1C1–118 Reform 1.15: Avaliku sektori
raamatupidamiseeskirjade reform Eesmärk
Finantsaruannete avaldamine ja
avaliku sektori asutuste tekkepõhise
raamatupidamisarvestuse reformi
käsitleva seadusandliku akti
jõustumine, mis katab vähemalt
90 % kogu avaliku sektori esmastest
kuludest, v.a riigile kuuluvad
ettevõtted.
M1C1–122 Reform 1.13: Kulude läbivaatamise
raamistiku reform Eesmärk
2025. aasta kulude läbivaatamise
lõpuleviimine, võttes arvesse 2022.,
2023. ja 2024. aastal 2025. aastaks
seatud säästueesmärki.
M1C2–13a Reform 2: Iga-aastased
konkurentsiseadused Eesmärk
Piirkondlikku raudteed ja
tehnosiiret käsitleva(te)
õigusakti(de) jõustumine
M1C3–3
Investeeringud – 1.2 Füüsiliste ja
kognitiivsete tõkete kõrvaldamine
muuseumides, raamatukogudes ja
arhiivides, et võimaldada laiemat
juurdepääsu kultuurile ja selles
osalemist
Siht
Sekkumised muuseumidesse,
mälestistesse, arheoloogilistesse
piirkondadesse ja parkidesse,
arhiividesse ja raamatukogudesse
M2C1–8
Investeering 2.3: Innovatsioon ja
mehhaniseerimine põllumajandus- ja
toidusektoris
Siht Elluviidud projektid
M2C1–9 Investeering 2.2: Põllumajandus-
päikesepark Siht
Paigaldatud päikeseenergia
tootmisvõimsus
M2C2–23
Investeering 4.1 – Investeeringud
pehmesse liikuvusse (riiklik
jalgrattateede kava)
Siht Haldussertifikaadid jalgrattateede
ehitamiseks
M4C1–20 Investeering 1.5: Kolmanda taseme
kutseõppesüsteemi arendamine Siht
Kutseõppesüsteemis osalevate
õpilaste arv
M4C1–22 Investeering 1.3: Koolispordi
infrastruktuuri parandamise kava Siht
Koolis kasutatavate spordirajatiste
ehitamine või renoveerimine
M4C1–23 Investeering 3.4: Õpetamine ja Eesmärk Meetmed keskkoolide ja
453
Järjekorra-
number
Seotud meede (reform või
investeering) Eesmärk/siht Nimetus
kõrgtasemel ülikoolioskused ülikooliprogrammide, sealhulgas
doktorikraadi omandamiseks ja
uuendamiseks.
M4C1–24
Investeering 1.6: Aktiivne
orienteerumine kooli ja ülikooli
vahelisele üleminekule.
Siht
Kooli-ülikooli üleminekukursuste
jaoks välja antud
osalemistunnistused
M5C1–7a Investeering 1 – Riiklike
tööturuasutuste tugevdamine Siht
Riiklike tööturuasutuste taristuga
seotud tegevus
M5C1–14
Investeering 2 – Soolise
võrdõiguslikkuse sertifitseerimise
süsteem
Siht Ettevõtjad on saanud soolise
võrdõiguslikkuse sertifikaadi
M5C1–16 Investeering 4 – Universaalne avalik
teenistus Siht
Universaalse avaliku teenistuse
projektidele väljastatud tõendid
M7–3 Reform 1: Taastuvenergia
loamenetluste lihtsustamine Eesmärk
Taastuvenergiaga seotud lubade
andmise digiplatvormi loomine
M7–11 Investeering 1: Võimendatud meede:
Arukad võrgud Eesmärk
Võrgust tarbimiseks tarnitava
maksimaalse võimsuse suurenemine
M7–12
Investeering 2: Võimendatud meede:
Sekkumised elektrivõrgu vastupidavuse
suurendamiseks
Eesmärk Suurendada elektrivõrgu
vastupidavust
M7–13
Investeering 3: Võimendatud meede:
Vesiniku tootmine mahajäetud
tööstusaladel (vesinikuorud)
Siht Paigaldatud elektrolüüsiseadmed
M7–15 Investeering 4: Türreeni ühendus Eesmärk Paigaldatud kaabel(id)
M7–17 Investeering 5: SA.CO.I.3 Eesmärk
Muundamisjaamade karpide
ehitamine Sardiinias
(Codrongianos) ja Toscanas
(Suvereto)
M7–22 Investeering 7: Arukas riiklik
ülekandevõrk Eesmärk
5G-seadmete, IKT-arhitektuuri,
info- ja
kommunikatsioonitehnoloogia
arhitektuuri, turvalise protokolli 104
paigaldamine elektrijaamadesse ja
elektrimastide seiresüsteemidesse
M7–27
Investeering 8: Kriitilise tähtsusega
toorainete kestlik, ringluspõhine ja
turvaline tarnimine
Eesmärk Linnakaevandamise ja ökodisaini
laborite seadmed
M7–31
Investeering 11: Piirkondliku
ühistranspordi raudteepargi
tugevdamine heitevabade rongide ja
universaalteenuse abil
Siht Hangitud rongide arv
M2C2–30
Investeering 4.5 – Erasõidukite ja
väikeste tarbesõidukite pargi
elektrisõidukitega uuendamise
programm
Siht Ostetud sõidukite arv
M1C2–14b Reform 3: Ettevõtetele pakutavate
stiimulite lihtsustamise raamistik. Eesmärk Esmaste õigusaktide jõustumine
M4C1–14b Reform 2.1: Õpetajate värbamine Eesmärk
Dekreedid, millega kiidetakse heaks
õpetajate avalike konkursside
nimekirjad
M1C1–121a Reform 1.12: Maksuhalduse reform Eesmärk
Maksude kogumise parandamist
käsitleva(te) õigusakti(de)
jõustumine
454
Järjekorra-
number
Seotud meede (reform või
investeering) Eesmärk/siht Nimetus
M2C2–29 Investeering 4.3 Laadimistaristu
paigaldamine Siht
Kiirlaadimisjaamade taristupunktide
arv
M4C1–15a Investeering 1.7: Stipendiumid ülikooli
pääsemiseks Siht
Ülikooli pääsemiseks antavad
stipendiumid
M5C1–4a Reform 1 – aktiivsed tööturumeetmed
ja kutseõpe Siht Koolitusel osalevad inimesed
M1C1–147
Investeering 1.2 – Pilvandmetöötluse
võimaldamine kohaliku omavalitsuse
jaoks
Siht Pilvandmetöötluse võimaldamine
kohalikule avalikule haldusele T2
M1C1–148
Investeering 1.4.1 – Kodanike
kogemused – digitaalsete avalike
teenuste kvaliteedi ja kasutatavuse
parandamine
Siht
Digitaalsete avalike teenuste
kvaliteedi ja kasutatavuse
parandamine T2
M2C2–10 Investeering 2.1 – Arukate võrkude
tugevdamine Eesmärk
Võrgu vastuvõtuvõimsuse ja
tarbimiseks tarnitava
maksimumvõimsuse suurendamine
M2C2–13
Investeering 2.2 – Sekkumised
elektrivõrgu vastupidavuse
suurendamiseks
Eesmärk Suurendada elektrivõrgu
vastupidavust
M2C2–35
Investeering 4.4.1: Piirkondliku
ühistranspordi bussipargi tugevdamine
heiteta bussidega
Siht Registreeritud heiteta busside arv
T2
M2C2–35
ter
Investeering 4.4.1: Piirkondliku
ühistranspordi bussipargi tugevdamine
heiteta bussidega
Siht Heiteta ja vähese heitega busside
laadimispunktide arv
M6C2–16
Investeering 2.2: Tervishoiusüsteemi
spetsialistide tehniliste, kutsealaste,
digi- ja juhtimisoskuste arendamine
Siht
Riikliku tervishoiuteenistuse
töötajate juhtimis- ja digioskuste
koolitused ning haiglanakkuste
ohutuse alased koolitused
M1C1–149
Investeering 1.4.3 – PagoPA
platvormiteenuste ja rakenduse „IO“
kasutuselevõtt
Siht PagoPA platvormiteenuste T2
kasutuselevõtu suurendamine
M1C1–150
Investeering 1.4.3 – PagoPA
platvormiteenuste ja rakenduse „IO“
kasutuselevõtt
Siht Rakenduse „IO“ T2 kasutuselevõtu
suurendamine
M1C1–152 Investeering 1.6.1 – Siseministeeriumi
digitaliseerimine Siht
Siseministeerium –
ümberprojekteeritud või digiteeritud
protsessid või teenused T2
M1C1–154 Investeering 1.6.2 –
Justiitsministeeriumi digitaliseerimine Siht
Õigusteabe järve teadmussüsteemid
T2
M7–50
Investeering 18 – Laiendamismeede:
Era- ja väikeste tarbesõidukite pargi
elektrisõidukitega uuendamise
programm
Siht Ostetud sõidukite arv
M1C1–151 Investeering 1.4.5 – Avalike
teadaannete digitaliseerimine Siht
Digitaalse teavitusplatvormi T2
vastuvõtmine
M1C1–155
Investeering 1.6.3 – Riikliku
sotsiaalkindlustusinstituudi (INPS) ja
riikliku tööõnnetuskindlustuse
instituudi (INAIL) digitaliseerimine
Siht INAIL – ümberprojekteeritud ja
digiteeritud protsessid/teenused T2
M2C2–55 Investeering 5.5 – Roheline
maksukrediit Siht Ettevõtetele 2024.–2025. aastal
esitatud dokumentide alusel antud
455
Järjekorra-
number
Seotud meede (reform või
investeering) Eesmärk/siht Nimetus
maksukrediidid
M2C4–20bis
Investeeringud. 3.1: Linna- ja
linnalähedaste metsade kaitse ja
edendamine
Siht Ümberistutatavad puud või põõsad
T3
Osamakse
summa 12 799 902 997 EUROT
456
2. Laenutoetus
Artikli 3 lõikes 2 osutatud osamaksed korraldatakse järgmiselt.
2.1.Esimene osamakse (laenutoetus):
Järjekorra-
number
Seotud meede (reform või
investeering) Eesmärk/siht Nimetus
M4C2–10 Investeering 2.1: ÜLEEUROOPALIST
HUVI PAKKUV TÄHTIS PROJEKT Eesmärk
Osalemiskutse avaldamine
riiklike projektide, sealhulgas
üleeuroopalist huvi pakkuvate
tähtsate projektide
mikroelektroonika projektide
kindlaksmääramiseks
M1C2–26
Investeering 5.1: SIMESTi hallatava
fondi 394/81 refinantseerimine ja
ümberkorraldamine
Eesmärk
Fondi 394/81 refinantseerimise
jõustumine ja
investeerimispoliitika
vastuvõtmine
M2C1–14
Investeering 1.1 – Uute
jäätmekäitlusrajatiste rakendamine ja
olemasolevate rajatiste
moderniseerimine; Investeering 1.2 –
Ringmajanduse juhtprojektid
Eesmärk Ministri käskkirja jõustumine.
M2C4–8
Investeering 1.1. Täiustatud ja
integreeritud seire- ja prognoosisüsteemi
rakendamine
Eesmärk
Täiustatud ja integreeritud seire-
ja prognoosisüsteemi tegevuskava
hüdroloogiliste riskide
kindlakstegemiseks
M5C1–17 Investeering 5 – Naistele kuuluvate
ettevõtete loomine Eesmärk
Võetakse vastu naiste ettevõtluse
toetamise fond
M1C2–27
Investeering 5.1: SIMESTi hallatava
fondi 394/81 refinantseerimine ja
ümberkorraldamine
Siht Fondist 394/81 toetust saanud
VKEd
M1C3–22 Investeering 4.2 – Turismiettevõtete
konkurentsivõime fondid Eesmärk
Investeerimispoliitika järgmistes
valdkondades: Euroopa
Investeerimispanga temaatiline
fond;
M1C3–23 Investeering 4.2: Turismiettevõtete
konkurentsivõime fondid Eesmärk
Riikliku turismifondi
investeerimispoliitika,
M1C3–24 Investeering 4.2 – Turismiettevõtete
konkurentsivõime fondid Eesmärk
Investeerimispoliitika järgmistes
valdkondades: VKEde
tagatisfond,
M1C3–25 Investeering 4.2: Turismiettevõtete
konkurentsivõime fondid Eesmärk
Fondo Rotativo
investeerimispoliitika
M1C3–26 Investeering 4.2: Turismiettevõtete
konkurentsivõime fondid Eesmärk
Majutusasutuste
ümberkorraldamise
maksusoodustuse
rakendusmääruse jõustumine.
M2C4–7 Reform 3.1: Õhusaaste kontrolli riiklike
programmide vastuvõtmine Eesmärk
Riikliku õhusaaste kontrolli
programmi jõustumine
M2C4–12
Investeering 2.1.b. Üleujutus- ja
hüdrogeoloogilise riski vähendamise
meetmed
Eesmärk
Üleujutus- ja hüdrogeoloogiliste
riskidega seotud sekkumisi
käsitleva läbivaadatud
õigusraamistiku jõustumine
457
Järjekorra-
number
Seotud meede (reform või
investeering) Eesmärk/siht Nimetus
M2C4–18
Investeeringud. 3.1: Linna- ja
linnalähedaste metsade kaitse ja
edendamine
Eesmärk
Linna- ja linnalähedaste
rohealade kaitset ja väärtustamist
käsitlevate läbivaadatud õiguslike
muudatuste jõustumine
M3C1–1
Reform 1.1 – taristu- ja
transpordiministeeriumi ning
raudteetaristu-ettevõtja vahelise lepingu
heakskiitmisprotsessi kiirendamine
Eesmärk
Contratti di Programma (CdP)
heakskiitmisprotsessi käsitleva
õigusakti muudatuse jõustumine
M3C1–2 Reform 1.2 – Projektidele loa andmise
protsessi kiirendamine Eesmärk
Sellise regulatiivse muudatuse
jõustumine, millega lühendatakse
projektidele loa andmise aega 11
kuult kuuele kuule
M3C1–21
Reform 2.1 – Hiljutise „dekreedi
lihtsustamise“ (mis muudeti 11.
septembri 2020. aasta seaduseks nr 120)
rakendamine, andes välja dekreedi, mis
käsitleb riskide liigitamise ja juhtimise,
turvalisuse hindamise ja olemasolevate
sildade järelevalve suuniste vastuvõtmist
Eesmärk
Riskide liigitamise ja juhtimise,
turvalisuse hindamise ning
olemasolevate sildade järelevalve
suuniste jõustumine
M3C1–22
Reform 2.2 – sildade ja viaduktide
omandi üleviimine madalama astme
teedelt kõrgema astme teedele
Eesmärk
Sildade, viaduktide ja tunnelite
omandiõiguse üleminek
madalama astme teedelt kõrgema
astme teedele (maanteed ja riigi
põhimaanteed)
M4C1–27
Reform 1.7: Üliõpilaste eluasemete
reguleerimise reform ja investeeringud
üliõpilaste eluasemetesse
Eesmärk
Üliõpilaste majutust käsitlevate
kehtivate eeskirjade muutmist
käsitlevate õigusaktide
jõustumine.
M5C3–10
Reform 1: Menetluste lihtsustamine ja
voliniku tugevdamine
erimajandustsoonides
Eesmärk
Määruse jõustumine, et
lihtsustada menetlusi ja
tugevdada voliniku rolli
erimajandustsoonides
M5C3–11 Investeering 1.4: Taristuinvesteeringud
erimajandustsoonis Eesmärk
Kõigi kaheksa erimajandustsooni
tegevuskavu heaks kiitvate
ministeeriumide dekreetide
jõustumine
M6C2–4 Investeering 1.1: Haiglate tehnoloogiliste
seadmete digitaalne ajakohastamine Eesmärk
Reorganiseerimise kava on heaks
kiitnud
tervishoiuministeerium/Itaalia
piirkonnad
Osamakse
summa 12 643 678 161 EUROT
458
2.2.Teine osamakse (laenutoetus):
Järjekorra
-number
Seotud meede (reform või
investeering)
Eesmärk/s
iht Nimetus
M1C2–28
Investeering 5.2:
Tarneahelate
konkurentsivõime ja
vastupanuvõime
Eesmärk Arenduslepingute investeerimispoliitikat sisaldava
dekreedi jõustumine
M2C4–27
Reform 4.1. Õigusaktide
lihtsustamine ja juhtimise
tugevdamine
veevarustustaristusse
tehtavate investeeringute
rakendamiseks
Eesmärk
Veevarustuse kindluse tagamiseks
primaarveetaristusse sekkumist käsitlevate
õigusaktide lihtsustamise jõustumine
M5C2–11
Investeering 4 –
Investeeringud linnade
taaselustamise projektidesse,
mille eesmärk on vähendada
marginaliseerumist ja
sotsiaalset degradeerumist
Eesmärk
Kõigi riigihankelepingute sõlmimine
investeeringuteks linnade taaselustamisse, et
vähendada marginaliseerumist ja sotsiaalset
degradeerumist, koos projektidega, mis on
kooskõlas taaste- ja vastupidavusrahastu
eesmärkidega, sealhulgas põhimõttega „ei kahjusta
oluliselt“
M5C2–15
Investeering 5 – Linnade
integreeritud kavad –
ebaseaduslike asunduste
ületamine, et võidelda
tööalase ärakasutamise vastu
põllumajanduses
Eesmärk
Ebaseaduslike asunduste kaardistamist käsitleva
ministri käskkirja jõustumiseks on vastu võetud
„Tavolo di contrasto allo sfruttamento lavorativo in
agricoltura“ ja ressursside eraldamist käsitlev
ministri käskkiri.
M5C2–19
Investeering 6 –
Eluasemekvaliteedi
innovatsiooniprogramm
Eesmärk
Piirkonnad ja autonoomsed provintsid (sealhulgas
nendel territooriumidel asuvad omavalitsused ja/või
suurlinnad) allkirjastasid lepingud
sotsiaaleluruumide ümberkujundamiseks ja
suurendamiseks.
M1C2–16
Investeering 3: Kiire
internetiühendus
(ülilairibaühendus ja 5G)
Eesmärk Kõigi riigihankelepingute sõlmimine kiiremate
ühendusprojektide jaoks
M1C3–12 Investeering 2.1 – Ajaloolise
väikelinna atraktiivsus Eesmärk
Kultuuriministeeriumi määruse jõustumine, mis
käsitleb vahendite eraldamist omavalitsustele
väikeste ajalooliste linnade atraktiivsuse
suurendamiseks
M1C3–13
Investeering 2.2 –
Maapiirkondade arhitektuuri
ja maastiku kaitse ja
parandamine
Eesmärk
Jõustub kultuuriministeeriumi dekreet vahendite
eraldamise kohta: maapiirkondade arhitektuuri ja
maastiku kaitseks ja parandamiseks
M1C3–14
Investeering 2.3 –
Programmid kohtade,
parkide ja ajalooliste aedade
identiteedi edendamiseks
Eesmärk
Jõustub kultuuriministeeriumi dekreet vahendite
eraldamise kohta: projektid, mille eesmärk on
suurendada kohtade, parkide ja ajalooliste aedade
identiteeti
M1C3–15
Investeering 2.4 –
kultuskohtade seismiline
ohutus, energia
lõpptarbimise pärandi
restaureerimine ja
kunstiteoste varjualused
Eesmärk
Jõustub kultuuriministeeriumi dekreet vahendite
eraldamise kohta: kultuse asemel seismiline ohutus
ja FEC (Fondo Edifici di Culto) pärandi
restaureerimine
459
Järjekorra
-number
Seotud meede (reform või
investeering)
Eesmärk/s
iht Nimetus
M1C3–35
– Investeeringud – 4.3 Caput
Mundi-Next Generation EU
turismialasteks
suurüritusteks
Eesmärk
Iga lepingu allkirjastamine kuue projekti puhul
turismiministeeriumi ja
toetusesaajate/rakendusasutuste vahel
M2C1–13 Reform 1.2 – Riiklik
jäätmekäitlusprogramm Eesmärk
Riiklikku jäätmekäitlusprogrammi käsitleva ministri
käskkirja jõustumine
M2C2–52 Investeering 5.2 – Vesinik Eesmärk Elektrolüüsiseadmete tootmine
M4C2–11
Investeering 2.1:
ÜLEEUROOPALIST HUVI
PAKKUV TÄHTIS
PROJEKT
Eesmärk
Jõustub riiklik õigusakt, millega eraldatakse
vajalikud rahalised vahendid projektis osalejate
toetamiseks.
M4C2–17
Investeering 3.1: Teadus- ja
innovatsioonitaristu
integreeritud süsteemi
loomise fond;
Investeerimiseks
Eesmärk
Lepingute sõlmimine projektide puhul, mis
käsitlevad: a) Teadus- ja innovatsioonitaristute
integreeritud süsteem
M4C2–18
Ülevõtmine1.5:
„Jätkusuutlikkust toetavate
innovatsiooni
ökosüsteemide“ loomine ja
tugevdamine, „teadus- ja
arendustegevuse
territoriaalsete liidrite“
loomine
Eesmärk Hankelepingute sõlmimine innovatsiooni
ökosüsteeme käsitlevate projektide puhul;
M4C2–19
Investeering 1.4:
Teadusstruktuuride
tugevdamine ning riiklike
teadus- ja arendustegevuse
liidrite loomise toetamine
mõnede peamiste progressi
võimaldavate tehnoloogiate
osas
Eesmärk
Lepingute sõlmimine peamiste progressi
võimaldavate tehnoloogiate alaste riiklike teadus- ja
arendustegevuse liidritega seotud projektide puhul
M4C2–20
Investeering 3.2:
Omakapitalisüst digipöörde
fondi (DTF)
Eesmärk
IT-valitsuse ja rakenduspartneri Cassa Depositi e
Prestiti (CDP) vaheline leping, millega luuakse
allkirjastatud rahastamisvahend
M6C1–1
Reform 1: Territoriaalse
tervishoiu abivõrgustiku uue
organisatsioonilise mudeli
määratlemine
Eesmärk Tervishoiu korralduse reformi käsitlevate teiseste
õigusaktide (ministri dekreet) jõustumine.
M6C1–2
Investeering 1.1: Kogukonna
tervisemajad territoriaalse
tervishoiuabi parandamiseks
Eesmärk Institutsioonilise arengu lepingu heakskiitmine
M6C1–4
Investeering 1.2: Kodu kui
esimene hoolduskoht ja
telemeditsiin
Eesmärk Koduhoolduse rakendamise digitaalset mudelit
sisaldavate suuniste heakskiitmine
M6C1–5
Investeering 1.2: Kodu kui
esimene hoolduskoht ja
telemeditsiin
Eesmärk Tervishoiuministeeriumi ja regioonide poolt heaks
kiidetud institutsioonilise arengu leping
M6C1–10
Investeering 1.3: Tugevdada
vahetasandi tervishoidu ja
selle rajatisi
(kogukonnahaiglad)
Eesmärk Institutsioonilise arengu lepingu (Contratto
Istituzionale di Sviluppo) heakskiitmine
M6C2–5 Investeering 1.1: Haiglate Eesmärk Institutsioonilise arengu lepingu heakskiitmine
460
Järjekorra
-number
Seotud meede (reform või
investeering)
Eesmärk/s
iht Nimetus
tehnoloogiliste seadmete
digitaalne ajakohastamine
Osamakse
summa 12 643 678 161 EUROT
2.3. Kolmas osamakse (laenutoetus):
Järjekorr
a-number Seotud meede (reform või investeering)
Eesmärk/s
iht Nimetus
M2C1–18 Investeering 3.1: Rohelised saared Eesmärk Direktori käskkirja jõustumine
M2C1–20 Investeering 3.2: Rohelised kogukonnad Eesmärk (Kõigi) riigihankelepingute sõlmimine
roheliste kogukondade valimiseks
M5C2–17 Investeering 5 – Linnade integreeritud
kavad – EIP fond Eesmärk
Fondi investeerimisstrateegia on heaks
kiitnud rahandusministeerium.
M1C1–123
Investeering 1.6.3 – Riikliku
sotsiaalkindlustusinstituudi (INPS) ja
riikliku tööõnnetuskindlustuse instituudi
(INAIL) digitaliseerimine
Siht INPS – „Üks sisseprojekteeritud klõps“
teenused/sisu T1
M1C1–124
Investeering 1.6.3 – Riikliku
sotsiaalkindlustusinstituudi (INPS) ja
riikliku tööõnnetuskindlustuse instituudi
(INAIL) digitaliseerimine
Siht
INPS – täiustatud info- ja
kommunikatsioonitehnoloogia (IKT)
oskustega töötajad T1
M1C3–30 Investeering 4.2: Turismiettevõtete
konkurentsivõime fondid Siht
Euroopa Investeerimispanga
temaatilised fondid: Väljamaksed fondi
kogusummas 350 000 000 eurot.
M1C3–31 Investeering 4.2: Turismiettevõtete
konkurentsivõime fondid Siht
Riiklik turismifond: Fondile tehakse
omakapitalitoetuse väljamakseid kogusummas 150 000 000 eurot.
M2C3–9 Investeering 3.1: Tõhusa kaugkütte
edendamine Eesmärk
Küttevõrkude täiustamise lepingud
sõlmib ökoloogilise ülemineku
ministeerium pärast avalikku
hankemenetlust.
M2C4–19
Investeeringud. 3.1: Linna- ja
linnalähedaste metsade kaitse ja
edendamine
Siht
Puude istutamine linna- ja
linnalähedaste rohealade kaitsmiseks ja
väärtustamiseks T1
M2C4–24 Investeering 3.4. Omanikuta maa-alade
mulla tervendamine Eesmärk Orbude tervendamise õigusraamistik
M3C1–3
Investeering 1.1 – Lõunasuunalised
kiirrongiühendused reisijate- ja
kaubaveoks
Eesmärk
Lepingu(te) sõlmimine kiirraudtee
ehitamiseks Napoli-Bari ja Palermo-
Catania liinidel
M3C1–12
Investeering 1.4 – Euroopa
raudteetranspordi juhtimissüsteemi
(ERTMS) kasutuselevõtmine
Eesmärk
Euroopa raudteetranspordi
juhtimissüsteemi hankelepingute
sõlmimine
M3C2–8
Investeering 1.1: Rohelised sadamad:
taastuvenergia ja energiatõhususega seotud
sekkumised sadamates
Siht Rohelised sadamad: tööde üleandmine
M4C1–29
Reform 1.7: Üliõpilaste eluasemete
reguleerimise reform ja investeeringud
üliõpilaste eluasemetesse
Eesmärk Üliõpilaste eluasemeid käsitlevate
õigusaktide reformi jõustumine.
461
Järjekorr
a-number Seotud meede (reform või investeering)
Eesmärk/s
iht Nimetus
M5C2–13 Investeering 5 – Linnade integreeritud
kavad – üldprojektid Eesmärk
Suurlinnapiirkondade linnade
taaselustamise projektide
investeerimiskava jõustumine
M6C2–7 Investeering 1.1: Haiglate tehnoloogiliste
seadmete digitaalne ajakohastamine Eesmärk Kõigi riigihankelepingute sõlmimine
Osamakse
summa 9 825 328 389 EUROT
462
2.4.Neljas osamakse (laenutoetus):
Järjekorra-
number
Seotud meede (reform või
investeering)
Eesmärk/si
ht Nimetus
M1C1–125
Investeering 1.2 –
Pilvandmetöötluse võimaldamine
kohaliku omavalitsuse jaoks
Eesmärk
(Kõikide) pilvandmetöötluse
võimaldamise avalike hangete lepingute
sõlmimine kohaliku avaliku halduse
hangete jaoks
M1C2–22 Investeering 4: Satelliittehnoloogia
ja kosmosemajandus Eesmärk
Kõigi riigihankelepingute sõlmimine
satelliittehnoloogia ja kosmoseprojektide
jaoks
M2C2–48
Investeering 3.1 – Vesiniku tootmine
mahajäetud tööstusaladel (Hydrogen
Valleys)
Eesmärk
Kõigi selliste riigihangete sõlmimine, mis
käsitlevad vesiniku tootmise projekte
mahajäetud tööstuspiirkondades asuvates
keskustes
M2C2–50
Investeering 3.2 – Vesiniku
kasutamine tööstuses, kus heidet on
raske vähendada
Eesmärk Kokkulepe edendada üleminekut metaanilt
saastevabale vesinikule
M5C2–21 Investeering 7 – Spordi ja sotsiaalse
kaasatuse projekt Eesmärk
Kõigi riigihankelepingute sõlmimine
spordi ja sotsiaalse kaasamise projektide
jaoks pärast avalikku projektikonkurssi
M1C3–20 Investeering 3.2: Filmitööstuse
arendamine (Cinecittà projekt) Eesmärk
Rakendusüksuse Cinecittà SPA ja
äriühingute vaheliste lepingute
allkirjastamine üheksa stuudio ehitamiseks
M2C4–21 Investeering 3.3 Po piirkonna
taasväärtustamine Eesmärk
Po piirkonna taasloodustamise sekkumiste
õigusraamistiku läbivaatamine
M4C1–28
Reform 1.7: Üliõpilaste eluasemete
reguleerimise reform ja
investeeringud üliõpilaste
eluasemetesse
Eesmärk
Täiendavate majutuskohtade (voodikohad)
loomist käsitlevate esialgsete lepingute
sõlmimine
M4C2–12
Investeering 2.1:
ÜLEEUROOPALIST HUVI
PAKKUV TÄHTIS PROJEKT
Eesmärk
Üleeuroopalist huvi pakkuvate tähtsate
projektide osalejate nimekiri valmib 30.
juuniks 2023.
M4C2–16 Investeering 3.1 – Teadusuuringute
ja innovatsiooni taristud Siht Rahastatud taristute arv
M5C1–18 Investeering 5 – Naistele kuuluvate
ettevõtete loomine Siht Ettevõtetele on antud finantstoetust
M6C2–14
Investeering 2.2: Tervishoiusüsteemi
spetsialistide tehniliste, kutsealaste,
digi- ja juhtimisoskuste arendamine
Siht Antakse stipendiume üldarsti
erikoolituseks.
Osamakse
summa 16 611 453 220 EUROT
2.5.Viies osamakse (laenutoetus):
Järjekorra-
number
Seotud meede (reform või
investeering)
Eesmärk/si
ht Nimetus
M2C3–5 Investeering 1.1: Uute koolide
ehitamine hoonete asendamise Eesmärk
Kõigi riigihankelepingute sõlmimine uute
koolide ehitamiseks hoonete väljavahetamise
463
Järjekorra-
number
Seotud meede (reform või
investeering)
Eesmärk/si
ht Nimetus
teel teel, et ajakohastada koolihoonete energiat,
pärast avalikku hankemenetlust
M2C4–28
Investeering 4.1.
Investeeringud veevarustuse
kindlust tagavatesse esmastesse
veeinfrastruktuuridesse
Eesmärk
Rahaliste vahendite eraldamine kõigile
projektidele (esmaveetaristusse
investeerimiseks ja veevarustuse kindluse
tagamiseks)
M2C4–30
Investeering 4.2.
Veejaotusvõrkude kadude
vähendamine, sealhulgas
võrkude digiteerimine ja seire
Eesmärk
Rahaliste vahendite eraldamine kõigile
projektidele, mis käsitlevad sekkumist
veejaotusvõrkudesse, sealhulgas võrkude
digiteerimist ja seiret
M1C1–14 Investeering 1.6.5:
Riiginõukogu digiteerimine Siht
Riiginõukogu – kohtudokumendid on
analüüsimiseks kättesaadavad andmehoidlas T1
M1C1–16 Investeering 1.6.5:
Riiginõukogu digiteerimine Siht
Riiginõukogu – kohtudokumendid on
analüüsimiseks kättesaadavad andmehoidlas T2
M1C1–126
Investeering 1.4.3 – PagoPA
platvormiteenuste ja rakenduse
„IO“ kasutuselevõtt
Siht PagoPA platvormiteenuste T1 kasutuselevõtu
suurendamine
M1C1–127
Investeering 1.4.3 – PagoPA
platvormiteenuste ja rakenduse
„IO“ kasutuselevõtt
Siht Rakenduse „IO“ T1 kasutuselevõtu
suurendamine
M1C1–128 Investeering 1.4.5 – Avalike
teadaannete digitaliseerimine Siht
Digitaalsete avalike teadaannete T1
kasutuselevõtu laiendamine
M1C1–129
Investeering 1.6.1 –
Siseministeeriumi
digitaliseerimine
Siht Siseministeerium – täielikult ümberkujundatud
ja digiteeritud protsessid T1
M1C1–130
Investeering 1.6.2 –
Justiitsministeeriumi
digitaliseerimine
Siht Digiteeritud kohtutoimikud T1
M1C1–131
Investeering 1.6.2 –
Justiitsministeeriumi
digitaliseerimine
Eesmärk Õigusteabe järve teadmussüsteemid T1
M1C1–132
Investeering 1.6.3 – Riikliku
sotsiaalkindlustusinstituudi
(INPS) ja riikliku
tööõnnetuskindlustuse
instituudi (INAIL)
digitaliseerimine
Siht INPS – „Üks sisseprojekteeritud klõps“
teenused/sisu T2
M1C1–133
Investeering 1.6.3 – Riikliku
sotsiaalkindlustusinstituudi
(INPS) ja riikliku
tööõnnetuskindlustuse
instituudi (INAIL)
digitaliseerimine
Siht
INPS – paremate info- ja
kommunikatsioonitehnoloogiaalaste oskustega
töötajad T2
M1C1–134
Investeering 1.6.3 – Riikliku
sotsiaalkindlustusinstituudi
(INPS) ja riikliku
tööõnnetuskindlustuse
instituudi (INAIL)
digitaliseerimine
Siht INAIL – täielikult ümberprojekteeritud ja
digiteeritud protsessid/teenused T1
M1C1–135
Investeering 1.6.4 –
Kaitseministeeriumi
digitaliseerimine
Siht Kaitseministeerium – protseduuride T1
digitaliseerimine
M1C1–136 Investeering 1.6.4 – Siht Kaitseministeerium – sertifikaatide T1
464
Järjekorra-
number
Seotud meede (reform või
investeering)
Eesmärk/si
ht Nimetus
Kaitseministeeriumi
digitaliseerimine
digiteerimine
M1C1–137
Investeering 1.6.4 –
Kaitseministeeriumi
digitaliseerimine
Eesmärk
Kaitseministeerium – institutsiooniliste
veebiportaalide ja intranetiportaalide
kasutuselevõtmine
M1C1–138
Investeering 1.6.4 –
Kaitseministeeriumi
digitaliseerimine
Siht
Kaitseministeerium – missiooniväliste kriitilise
tähtsusega rakenduste migratsioon taristu
avatusest lähtuva täieliku teabekaitse
lahendusse (S.C.I.P.I.O.) T1
M1C2–29
Investeering 5.2: Tarneahelate
konkurentsivõime ja
vastupanuvõime
Siht Arenduslepingud heaks kiidetud
M2C1–15a
Reform 1.2 Riiklik
jäätmekäitlusprogramm:
Investeering 1.1 – Uute
jäätmekäitlusrajatiste
rakendamine ja olemasolevate
rajatiste moderniseerimine
Siht Ebaseaduslike prügilate arvu vähendamine (T2)
M2C1–15b
Reform 1.2 Riiklik
jäätmekäitlusprogramm:
Investeering 1.1 – Uute
jäätmekäitlusrajatiste
rakendamine ja olemasolevate
rajatiste moderniseerimine
Siht Liigiti kogumise piirkondlikud erinevused
M2C1–15
quater
Investeering 1.1 – Uute
jäätmekäitlusrajatiste
rakendamine ja olemasolevate
rajatiste moderniseerimine
Eesmärk Biojäätmete liigiti kogumise kohustuse
jõustumine
M2C2–24
Investeering 4.2
Kiirtranspordisüsteemide
arendamine
Eesmärk
Kõigi riigihankelepingute sõlmimine
suurlinnapiirkondade metroode, trammiteede,
trollibusside ja köisteede ehitamiseks
M2C2–32
Investeering 4.4.1: Piirkondliku
ühistranspordi bussipargi
tugevdamine heiteta bussidega
Eesmärk
Kõigi riigihankelepingute sõlmimine
piirkondliku ühistranspordi bussipargi
tugevdamiseks heiteta ja madala põrandaga
bussidega
M2C3–7
Investeering 1.2 – Hoonete
ehitamine, kinnisvara
ümberkvalifitseerimine ja
tugevdamine õigusemõistmise
käigus
Eesmärk
Kõigi uute hoonete ehitamise,
ümberkvalifitseerimise ja õigusemõistmise
kinnisvara tugevdamise riigihankelepingute
sõlmimisele kirjutab avaliku sektori hankija alla
pärast avalikku hankemenetlust.
M2C4–33
Investeering 4.3 Investeeringud
niisutussüsteemi
vastupanuvõimesse veevarude
paremaks majandamiseks
Eesmärk
Rahaliste vahendite eraldamine kõigile
niisutussüsteemi vastupanuvõime projektidele
veevarude paremaks majandamiseks
M2C4–36
Investeering 4.4 –
Investeeringud kanalisatsiooni
ja puhastusse
Eesmärk Kõigi kanalisatsiooni- ja puhastusteenuste
riigihankelepingute sõlmimine
M3C1–4
Investeering 1.1 –
Lõunasuunalised
kiirrongiühendused reisijate- ja
kaubaveoks
Eesmärk Lepingu sõlmimine kiirraudtee ehitamiseks
Salerno Reggio Calabria liinidel
M3C1–17 Investeering 1.7 – Lõuna-
Euroopa raudteede Siht
Lõpule on viidud 150 km töid, mis on seotud
lõunas asuvate raudteede ajakohastamise,
465
Järjekorra-
number
Seotud meede (reform või
investeering)
Eesmärk/si
ht Nimetus
ajakohastamine,
elektrifitseerimine ja
vastupidavus
elektrifitseerimise ja vastupidavusega ning on
valmis loa saamiseks ja kasutusetapiks.
M4C2–5
Investeering 1.1: Olulist
riiklikku huvi pakkuvad
teadusprojektid (PRIN)
Siht Toetust saanud teadusprojektide arv
M6C1–8
Investeering 1.2: Kodu kui
esimene hoolduskoht ja
telemeditsiin
Siht
Vähemalt üks telemeditsiini projekt määratakse
igale piirkonnale (võttes arvesse nii konkreetses
piirkonnas rakendatavaid projekte kui ka
projekte, mida võidakse arendada
piirkondadevaheliste konsortsiumide osana)
Osamakse
summa 9 030 593 086 EUROT
2.6.Kuues osamakse (laenutoetus):
Järjekorra
-number Seotud meede (reform või investeering)
Eesmärk/
siht Nimetus
M3C1–10 Investeering 1.3 – Diagonaalühendused Eesmärk
Lepingu sõlmimine ühenduste
ehitamiseks Orte-Falconara ja
Taranto-Metaponto-Potenza-
Battipaglia liinidel
M7–35
Investeering 13: Aadria mere torujuhtme 1. etapp
(Sulmona kompressorjaam ja Sestino-Minerbio
gaasijuhe)
Eesmärk
Asjakohaste keskkonnamõju
hindamiste (VIncA)
vastuvõtmine ja ajakohastamine
M7–40 Investeering 15: Transizione 5.0 Eesmärk
Rahastamiskõlblike sekkumiste
kriteeriume kehtestava õigusakti
jõustumine
M2C1–15 Reform 1.2 Riiklik jäätmekäitlusprogramm Siht Ebaseaduslike prügilate
vähendamine (T1)
M2C1–16a Reform 1.2 Riiklik jäätmekäitlusprogramm Siht Ebaseaduslikud prügilad
M2C1–22
Investeering 3.4: Fondo Contratti di Filiera
(FCF), et toetada tarneahelalepinguid
põllumajandusliku toidutööstuse, kalanduse ja
vesiviljeluse, metsanduse, lillekasvatuse ja
taimekoolide sektoris
Eesmärk Rakenduskokkulepe.
M2C2–31 Investeering 4.4.3: Riikliku tuletõrje juhtimise
alla kuuluva laevastiku uuendamine Eesmärk
Kõigi riigi tuletõrjemeeskonna
koosseisu uuendamise
riigihankelepingute sõlmimine
M2C4–6 Investeering 3.2: Rahvusparkide digiteerimine Siht
Halduskorra lihtsustamine ja
digitaalteenuste arendamine
rahvusparkide ja merekaitsealade
külastajatele
M3C2–10
Reform 2.2: Riikliku digitaalse logistika
platvormi loomine kauba- ja/või
reisijateveoteenuste digiteerimiseks
Eesmärk Riiklik digitaallogistika platvorm
M6C2–15 Investeering 2.2: Tervishoiusüsteemi
spetsialistide tehniliste, kutsealaste, digi- ja Siht
Antakse täiendavaid stipendiume
üldarsti erikoolituseks.
466
Järjekorra
-number Seotud meede (reform või investeering)
Eesmärk/
siht Nimetus
juhtimisoskuste arendamine
M7–36
Investeering 13: Aadria mere torujuhtme 1. etapp
(Sulmona kompressorjaam ja Sestino-Minerbio
gaasijuhe)
Eesmärk Lepingute sõlmimine
M7–38 Investeering 14: Piiriülene gaasiekspordi
infrastruktuur Eesmärk Lepingute sõlmimine
Osamakse
summa 7 908 481 227 EUROT
2.7.Seitsmes osamakse (laenutoetus):
Järjekorr
a-number Seotud meede (reform või investeering)
Eesmärk/
siht Nimetus
M1C1–139
Investeering 1.2 – Pilvandmetöötluse
võimaldamine kohaliku omavalitsuse
jaoks
Siht Pilvandmetöötluse võimaldamine
kohalikule avalikule haldusele T1
M2C2–25 Investeering 4.2 Kiirtranspordisüsteemide
arendamine Eesmärk
Kõigi riigihankelepingute sõlmimine
heiteta veeremi ostmiseks ja sekkumised
kiirtranspordisüsteemide taristu
ajakohastamiseks
M2C4–11
Investeering 2.1.a. Üleujutus- ja
hüdrogeoloogilise ohu vähendamise
meetmed – Sekkumised Emilia
Romagnas, Toscanas ja Marches
Eesmärk Sekkumiste kindlaksmääramine
hädaolukorra voliniku käskkirja(de)ga
M7–46
Investeering 17: Rahastamisvahend
avaliku sektori elamute energiatõhusaks
renoveerimiseks
Eesmärk Volituste eesmärgi määratlemine
M1C1–140
Investeering 1.4.1 – Kodanike kogemused
– digitaalsete avalike teenuste kvaliteedi
ja kasutatavuse parandamine
Siht Digitaalsete avalike teenuste T1
kvaliteedi ja kasutatavuse parandamine
M1C1–141 Investeering 1.6.4 – Kaitseministeeriumi
digitaliseerimine Siht
Kaitseministeeriumi menetluste
digitaliseerimine T2
M1C1–142 Investeering 1.6.4 – Kaitseministeeriumi
digitaliseerimine Siht
Kaitseministeeriumi tõendite
digitaliseerimine T2
M1C1–143 Investeering 1.6.4 – Kaitseministeeriumi
digitaliseerimine Siht
Kaitseministeerium – missiooni jaoks
kriitilise tähtsusega ja mittekriitiliste
rakenduste migratsioon taristu avatuse
kaudu täieliku teabekaitse lahendusse
(S.C.I.P.I.O.) T2
M1C2–19 Investeering 3: Kiire internetiühendus
(ülilairibaühendus ja 5G) Siht Ülilairibaühendusega saared
M1C3–27
Investeering 4.3 – Caput Mundi-Next
Generation EU turismialasteks
suurüritusteks
Siht
Nende kultuuri- ja turismiobjektide arv,
mille ümberkvalifitseerimine jõudis
keskmiselt 50 %ni Stato Avanzamento
Lavorist (SAL) (esimene partii)
M2C1–16b
Investeering 1.1 – Uute
jäätmekäitlusrajatiste rakendamine ja
olemasolevate rajatiste moderniseerimine
Siht Liigiti kogumise määrade piirkondlikud
erinevused
M2C1–25 Investeering 3.4: Fondo Contratti di Eesmärk Ministeerium on vahendite kogusumma
467
Järjekorr
a-number Seotud meede (reform või investeering)
Eesmärk/
siht Nimetus
Filiera (FCF), et toetada
tarneahelalepinguid põllumajandusliku
toidutööstuse, kalanduse ja vesiviljeluse,
metsanduse, lillekasvatuse ja taimekoolide
sektoris
ümber paigutanud
M2C2–9 Investeering 2.1 – Arukate võrkude
tugevdamine Siht
Arukad võrgud – võrgu võimsuse
suurendamine taastuvenergia
jaotamiseks
M2C2–34
Investeering 4.4.1: Piirkondliku
ühistranspordi bussipargi tugevdamine
heiteta bussidega
Siht Registreeritud heiteta madala põrandaga
busside arv T1
M2C2–34a
Investeering 4.4.2: Piirkondliku
ühistranspordi raudteepargi tugevdamine
heitevabade rongide ja universaalteenuse
abil
Siht Heitevabade rongide arv
M2C2–38a
Investeering 5.1: Ökoloogilise ülemineku
ja nullnetotehnoloogia tootmissüsteemi
ning strateegiliste tarneahelate
konkurentsivõime ja vastupidavuse
toetamine
Eesmärk Rakenduskokkulepe.
M2C2–39
Investeering 5.1. Ökoloogilise ülemineku
tootmissüsteemi, nullnetotehnoloogia ning
strateegiliste tarnete konkurentsivõime ja
vastupidavuse toetamine
Eesmärk
Itaalia Ettevõtlus- ja Made in Italy
ministeerium on viinud lõpule rahaliste
vahendite ülekandmise äriühingule
Invitalia S.p.A.
M2C2–42a Investeering 5.4 – Omakapitalisüst
rohepöörde fondi (GTF) Eesmärk Omakapitalisüst rohepöörde fondi
M2C2–44 Investeering 1.1 – Põllumajandusliku
päikeseenergia süsteemide arendamine Eesmärk
Kõigi riigihankelepingute sõlmimine
päikesepaneelide paigaldamiseks
põllumajanduses kasutatavatesse
päikeseenergiasüsteemidesse
M2C4–22 Investeering 3.3 Po piirkonna
taasväärtustamine Siht
Jõesängi kunstlikkuse vähendamine Po
piirkonna T1 taasloomiseks
M2C4–31
Investeering 4.2. Veejaotusvõrkude
kadude vähendamine, sealhulgas võrkude
digiteerimine ja seire
Siht
Sekkumine veejaotusvõrkudesse,
sealhulgas võrkude T1 digiteerimine ja
seire
M2C4–34
Investeering 4.3 Investeeringud
niisutussüsteemi vastupanuvõimesse
veevarude paremaks majandamiseks
Siht
Sekkumised niisutussüsteemi
vastupanuvõime suurendamiseks, et
parandada veevarude majandamist T1
M2C4–35
Investeering 4.3 Investeeringud
niisutussüsteemi vastupanuvõimesse
veevarude paremaks majandamiseks
Siht
Sekkumised niisutussüsteemi
vastupanuvõime suurendamiseks, et
parandada veevarude majandamist T1
M3C1–15
Investeering 1.5 –
Suurlinnatranspordisõlmede ja peamiste
riiklike ühenduste tugevdamine
Siht
700 km ajakohastatud liinilõiku, mis on
ehitatud suurlinnatranspordisõlmedele ja
peamistele riiklikele ühendustele
M3C1–19 Investeering 1.8 – Raudteejaamade
ajakohastamine (RFI juhtimine; lõunas) Siht
Ajakohastatud ja juurdepääsetavad
raudteejaamad
M4C2–21a Investeering 3.2 – Digiüleminekufondi
tehtud omakapitalisüst Eesmärk Omakapitalisüst digipöörde fondi
M5C3–12 Investeering 1.4: Taristuinvesteeringud
erimajandustsoonis Siht
Infrastruktuuri sekkumisprojektidega
seotud tööde alustamine
erimajandustsoonides
M6C1–7 Investeering 1.2: Kodu kui esimene
hoolduskoht ja telemeditsiin Siht
Täielikult toimivad
koordineerimiskeskused (teine pakett)
468
Järjekorr
a-number Seotud meede (reform või investeering)
Eesmärk/
siht Nimetus
M7–43
Investeering 16: Toetus VKEdele
taastuvatest energiaallikatest omatarbeks
toodetud energia tootmiseks
Eesmärk Rakenduskokkulepe.
M7–44
Investeering 16: Toetus VKEdele
taastuvatest energiaallikatest omatarbeks
toodetud energia tootmiseks
Eesmärk
Itaalia Ettevõtlus- ja Made in Italy on
viinud lõpule rahaliste vahendite
ülekandmise Invitaliale
M2C4–20
Investeeringud. 3.1: Linna- ja
linnalähedaste metsade kaitse ja
edendamine
Siht
Puude istutamine linna- ja
linnalähedaste rohealade kaitseks ja
väärtustamiseks T2
Osamakse
summa 15 715 972 025 EUROT
469
2.8.Kaheksas osamakse (laenutoetus):
Järjekorra-
number Seotud meede (reform või investeering)
Eesmärk/si
ht Nimetus
M7–47
Investeering 17: Rahastamisvahend avaliku
sektori elamute energiatõhusaks
renoveerimiseks
Eesmärk Rakenduskokkulepe.
M7–48
Investeering 17: Rahastamisvahend avaliku
sektori elamute energiatõhusaks
renoveerimiseks
Eesmärk Ministeerium on investeeringu
lõpule viinud
M1C1–146
Investeering 1.4.4 – Riiklike digiidentiteedi
platvormide (SPID, CIE) ja riikliku registri
(ANPR) kasutuselevõtt
Siht Riiklik digiidentiteedi platvorm
(CIE)
M1C3–16 Investeeringud – 2.1 Väikeste ajalooliste
linnade atraktiivsus Eesmärk
Väikestes ajaloolistes linnades
toetust saavate ettevõtete
nimekirja käsitleva(te)
käskkirja(de) vastuvõtmine
M2C4–9 Investeering 1.1. Täiustatud ja integreeritud
seire- ja prognoosisüsteemi rakendamine Eesmärk
Seire- ja prognoosisüsteem on
kättesaadav
M2C4–26 Investeering 3.5. Merepõhja ja
mereelupaikade taastamine ja kaitse Siht
Merepõhja ja mereelupaikade
taastamine ja kaitse
M4C2–6 Investeering 1.1: Olulist riiklikku huvi
pakkuvad teadusprojektid (PRIN) Eesmärk
Projektide väljavalimist
käsitleva(te) dekreeti(de)
avaldamine
M4C2–7 Investeering 1.1: Olulist riiklikku huvi
pakkuvad teadusprojektid (PRIN) Siht
Tööle võetud tähtajalise lepinguga
teadlaste arv
M4C2–8
Investeering 1.3: Ülikoolidele,
teaduskeskustele ja ettevõtetele laiendatud
partnerlused ning alusuuringute projektide
rahastamine
Siht Sõlmitud teaduspartnerluste arv
M4C2–22 Investeering 2.1: ÜLEEUROOPALIST
HUVI PAKKUV TÄHTIS PROJEKT Siht Toetatud projektide arv
M6C1–6 Investeering 1.2: Kodu kui esimene
hoolduskoht ja telemeditsiin Siht Koduhooldus
Osamakse
summa 11 184 566 013 EUROT
2.9.Üheksas osamakse (laenutoetus):
Järjekorra
-number
Seotud meede (reform või
investeering)
Eesmärk/si
ht Nimetus
M1C1–145
Investeering 1.4.4 – Riikliku
digiidentiteedi platvormi (SPID, CIE) ja
riikliku registri (ANPR) kasutuselevõtu
laiendamine
Siht Riiklik digiidentiteedi platvorm (CIE)
ja riiklik register (ANPR)
M1C3–28 Investeering 4.2: Turismiettevõtete
konkurentsivõime fondid Siht
Dekreet/dekreedid maksu
ümberarvutuse ja/või
väljamaksetaotluse rahuldamise ja
laekumise kohta
470
Järjekorra
-number
Seotud meede (reform või
investeering)
Eesmärk/si
ht Nimetus
M1C3–32 Investeering 4.2: Turismiettevõtete
konkurentsivõime fondid Siht
VKEde tagatisfondist toetatavate
ettevõtete arv
M6C2–8 Investeering 1.1: Haiglate tehnoloogiliste
seadmete digitaalne ajakohastamine Siht
Haiglad digiteeritakse (DEA –
Hädaabi- ja vastuvõtuosakonnad – I
ja II aste)
M6C2–11
Investeering 1.3: Tehnoloogilise taristu
ning andmekogumise, andmetöötluse, -
analüüsi ja -simulatsiooni vahendite
tugevdamine
Siht Üldarstid, kes sisestavad digitaalseid
terviselugusid.
M1C3–33 Investeering 4.2 – Turismiettevõtete
konkurentsivõime fondid Siht
Fondo Rotativo: Lõplike abisaajatega
sõlmitud õiguslik kokkulepe
M1C3–9a Investeering 4.1 – Digiturismi keskus Siht
Ettevõtete, sealhulgas
üksikettevõtjate registreerimine
digitaalse turismi keskuses ning
juurdepääs keskuse osutatavatele
teenustele ja teenuste kättesaadavus
digitaalse turismi keskuses
M1C3–18
Investeering 2.3 – Ajalooliste parkide ja
aedade säilitamise ja renoveerimise
programmid
Siht Renoveeritud ajalooliste parkide ja
aedade arv
M2C1–23
Investeering 3.4: Fondo Contratti di
Filiera (FCF), et toetada
tarneahelalepinguid põllumajandusliku
toidutööstuse, kalanduse ja vesiviljeluse,
metsanduse, lillekasvatuse ja
taimekoolide sektoris
Eesmärk ISMEA-le ülekantud vahendid ja
rakenduslepingu muutmine
M4C1–31 Investeering 5: Üliõpilaste eluasemefond Eesmärk Rakenduskokkulepe.
M5C1–19a Investeering 5 – Naistele kuuluvate
ettevõtete loomine Eesmärk
Rakendusleping ja üleandmine
Invitaliale
M1C2–30 Investeering 7 – Riiklik ühenduvusfond Eesmärk Rakenduskokkulepe.
M2C1–26
Investeering 4: Põllumajandus-
päikesepargi rajatis Eesmärk Rakenduskokkulepe.
M5C2–18 Investeering 5 – Linnade integreeritud
kavad – EIP fond Siht
Lõplike abisaajatega sõlmitud
juriidilised lepingud, mille aluseks
olevate projektide
investeerimisväärtus on vähemalt
545 000 000 eurot
Osamakse
summa 7 118 464 154 EUROT
2.10. Kümnes osamakse (laenutoetus):
Järjekorra-
number
Seotud meede (reform või
investeering)
Eesmärk/s
iht Nimetus
M1C1–26 Investeering 1.1: Digitaristu Siht
Migratsioon Polo Strategico
Nazionalesse või turvalisse
sertifitseeritud avalikku
pilvekeskkonda
M2C3–6 Investeering 1.1: Uute koolide Siht Uute koolide ehitamine
471
Järjekorra-
number
Seotud meede (reform või
investeering)
Eesmärk/s
iht Nimetus
ehitamine hoonete asendamise teel
M2C3–8
Investeering 1.2 – Osaliselt või
täielikult õigusemõistmises kasutatava
avaliku sektori kinnisvara
ümberkvalifitseerimine
Siht Tööd vähemalt 289 000 ruutmeetri
avaliku sektori kinnisvaraga
M2C3–10 Investeering 3.1: Tõhusa kaugkütte
edendamine Siht
Kaugküttevõrkude ehitamine või
laiendamine energiatarbimise
vähendamiseks
M2C4–23 Investeering 3.3 Po piirkonna
taasväärtustamine Siht
Jõesängi kunstlikkuse vähendamine Po
piirkonna T2 taasloomiseks
M2C4–25 Investeering 3.4. Omanikuta maa-alade
mulla tervendamine Siht Omanikuta paikade taaselustamine
M2C4–29
Investeering 4.1. Investeeringud
veevarustuse kindlust tagavatesse
esmastesse veeinfrastruktuuridesse
Siht Haldussertifikaadid sekkumiseks
veesüsteemides
M2C4–38 Investeering 4.4 – Investeeringud
kanalisatsiooni ja puhastusse Siht
Kanalisatsiooni ja asulareovee
puhastamisega seotud sekkumised
M5C2–20 Investeering 6 – Eluasemekvaliteedi
innovatsiooniprogramm Siht
Ehitatud, ostetud või renoveeritud
elamuüksuste arv
M1C2–15 Investeering 2: Mikroelektroonika
innovatsioon ja tehnoloogia Eesmärk
Ränikarbiidi substraatide
tootmisvõimsus
M1C2–17 Investeering 3: Kiire internetiühendus
(ülilairibaühendus ja 5G) Siht
Majanumbrid on aktiveeritud 1 Gbit/s
ühendusega
M1C2–18 Investeering 3: Kiire internetiühendus
(ülilairibaühendus ja 5G) Siht
1 Gbit/s ühendusega kooliruumid ja
tervishoiuasutused
M1C2–20 Investeering 3: Kiire internetiühendus
(ülilairibaühendus ja 5G) Siht
5G-võrguga kaetud linnavälised teed ja
TEN-T koridorid
M1C2–21 Investeering 3: Kiire internetiühendus
(ülilairibaühendus ja 5G) Siht
Turutõrgete piirkonnad, kus 5G leviala
on aktiveeritud või tagatud
M1C3–21 Investeering 3.2: Filmitööstuse
arendamine (Cinecittà projekt) Siht
Stuudiote ehitamine ja/või
renoveerimine ning eksperimentaalse
kinematograafia keskuse teenuste
osutamine
M1C3–36
–Investeering – 4.3 Caput Mundi-Next
Generation EU turismialasteks
suurüritusteks
Siht Ehitustööde või teenuste lõpetamise
tõendid
M2C1–16 Reform 1.2
Riiklik jäätmekäitlusprogramm Siht Ebaseaduslikud prügilad
M2C1–19 Investeering 3.1: Rohelised saared Siht Haldusakt(id) sekkumiseks väikesaartel
M2C1–21 Investeering 3.2: Rohelised kogukonnad Siht Haldustõendid projektide lõpuleviimise
kohta rohelistes kogukondades
M2C1–24
Investeering 3.4: Fondo Contratti di
Filiera (FCF), et toetada
tarneahelalepinguid põllumajandusliku
toidutööstuse, kalanduse ja
vesiviljeluse, metsanduse, lillekasvatuse
ja taimekoolide sektoris
Siht Õiguslikud kokkulepped lõplike
abisaajatega
M2C2–5
Investeering 1.4 – Biometaani
arendamine vastavalt ringmajanduse
edendamise kriteeriumidele
Eesmärk
Rakendusleping, lõplike abisaajatega
sõlmitud õiguslikud lepingud ja
investeeringute lõpuleviimine
472
Järjekorra-
number
Seotud meede (reform või
investeering)
Eesmärk/s
iht Nimetus
M2C2–17 Investeering 3.4 – Vesinikukatsed
raudtee- ja maanteetranspordis Siht Ehitatud vesinikutanklate arv
M2C2–19 Investeering 3.5 – Vesinikualane
teadus- ja arendustegevus Siht
Vesinikualase teadus- ja
arendustegevuse projektide arv
M2C2–26 Investeering 4.2
Kiirtranspordisüsteemide arendamine Eesmärk
Avalik taristu ja veerem kiireks
massitranspordiks
M2C2–35
bis
Investeering 4.4.2: Piirkondliku
ühistranspordi raudteepargi
tugevdamine heitevabade rongide ja
universaalteenuse abil
Siht Hangitud rongide arv
M2C2–40
Investeering 5.1. Ökoloogilise
ülemineku ja nullnetotehnoloogia
tootmissüsteemi ning strateegiliste
tarneahelate konkurentsivõime ja
vastupidavuse toetamine
Siht
Rakenduslepingu muutmine, lõplikele
toetusesaajatele toetuse andmise otsus
ja investeeringute lõpuleviimine
M2C2–43 Investeering 5.4 – Omakapitalisüst
rohepöörde fondi (GTF) Eesmärk Raporti vastuvõtmine
M2C2–47
Investeering 1.2 – Taastuvate
energiaallikate edendamine
energiakogukondade ja ühiselt oma
tarbeks toodetud taastuvenergia
tarbijate jaoks
Eesmärk
Rakendusleping, lõplike abisaajatega
sõlmitud õiguslikud lepingud ja
investeeringute lõpuleviimine
M2C2–49
Investeering 3.1 – Vesiniku tootmine
mahajäetud tööstusaladel (Hydrogen
Valleys)
Siht Paigaldatud elektrolüüsiseadmed
M2C2–53 Investeering 5.2 – Vesinik Siht Ehitatud tööstusettevõte
(tööstusettevõtted)
M2C4–6bis Investeering 3.2: Rahvusparkide
digiteerimine Eesmärk
Looduse kaitse ja seirega seotud
sekkumised
M2C4–11a
Investeering 2.1.a. Üleujutus- ja
hüdrogeoloogilise ohu vähendamise
meetmed – Sekkumised Emilia
Romagnas, Toscanas ja Marches
Siht Läbiviidud sekkumised
M2C4–13
Investeering 2.1b – Üleujutus- ja
hüdrogeoloogilise riski vähendamise
meetmed
Siht Rakendatud D- ja E-tüüpi sekkumised
M2C4–34a
Investeering 4.3 Investeeringud
niisutussüsteemi vastupanuvõimesse
veevarude paremaks majandamiseks
Siht
Sekkumised niisutussüsteemi
vastupanuvõime suurendamiseks, et
parandada veevarude majandamist T1.2
M3C2–5bis Investeering 2.1 – Logistikaahela
digitaliseerimine Siht Logistikaahela digiteerimine
M3C2–6 Investeering 2.2: Lennuliikluse
korraldamise digitaliseerimine Eesmärk
Lennuliikluse korraldamise
digitaliseerimine
M3C1–6 Investeering 1.1 – Kesk- ja
lõunapiirkonna kiirraudteeliinid Siht
Kiirraudteeliinid Napoli-Bari, Salerno-
Reggio Calabria, Palermo-Catania,
Orte-Falconara, Taranto-Metaponto-
Potenza-Battipaglia.
M3C1–9 Investeering 1.2 – Kiirliinid põhjaosas Siht Kiirraudtee Brescia-Verona-Vicenza-
Padova liinil; Liguuria-Alpi.
M3C1–14 Investeering 1.4 – Euroopa
raudteetranspordi juhtimissüsteemi Siht
2 785 km raudteed, mis on taristu
ja/või tehnoloogia tasandil varustatud
473
Järjekorra-
number
Seotud meede (reform või
investeering)
Eesmärk/s
iht Nimetus
(ERTMS) kasutuselevõtmine Euroopa raudteetranspordi
juhtimissüsteemiga.
M3C1–20 Investeering 1.8 – Raudteejaamade
ajakohastamine Siht Ajakohastatud raudteejaamad
M3C1–26 Reform 1.3 – Itaalia raudteetaristu
tõhususe suurendamine Eesmärk Õigusakti(de) jõustumine
M4C1–30
Reform 1.7: Üliõpilaste eluasemete
reguleerimise reform ja investeeringud
üliõpilaste eluasemetesse
Siht Loodud on üliõpilaste
magamisasemeüksused
M4C2–9
Investeering 1.4: „Riiklike teadus- ja
arendustegevuse liidrite“ loomine
mõnede peamiste progressi
võimaldavate tehnoloogiate valdkonnas
Siht Riiklikud keskused, mille kohta on
väljastatud tegevusaruanne
M4C2–14 Investeering 2.3: Tehnosiirde keskused Siht Väljamakse rahalise väärtusega
309 000 000 eurot .
M4C2–16
bis
Investeering 3.1: Teadusuuringute ja
innovatsiooni taristud Siht
Teadusuuringute ja innovatsiooni
infrastruktuurid, mille kohta on
koostatud tegevusaruanne
M4C2–18
bis
Ülevõtmine 1.5: „Jätkusuutlikkust
toetavad innovatsiooni ökosüsteemid“,
millega luuakse „teadus- ja
arendustegevuse territoriaalsed liidrid“
Siht Innovatsiooni ökosüsteemid, mille
kohta on koostatud tegevusaruanne
M4C2–21 Investeering 3.2 – Digiüleminekufondi
tehtav omakapitalisüst Eesmärk Raporti vastuvõtmine
M5C2–12
Investeering 4 – Investeeringud linnade
taaselustamise projektidesse, mille
eesmärk on vähendada
marginaliseerumist ja sotsiaalset
degradeerumist
Siht Elluviidud projektid
M5C2–14 Investeering 5 – Linnade integreeritud
kavad – üldprojektid Siht Elluviidud projektid
M5C2–16
Investeering 5 – Linnade integreeritud
kavad – ebaseaduslike asunduste
ületamine, et võidelda tööalase
ärakasutamise vastu põllumajanduses
Siht Eluasemeprojektid ja platvormi
loomine
M5C2–22 Investeering 7 – Sport ja sotsiaalne
kaasatus Siht
Haldussertifikaadid spordirajatiste
ehitamise või renoveerimisega seotud
sekkumisteks
M5C3–4 Investeering 1.1.2: Territoriaalse
lähedusega tervishoiuasutused Eesmärk
Toetus maapiirkondade apteekidele alla
5 000 elanikuga omavalitsusüksustes,
külades või asulates (teine partii)
M5C3–13 Investeering 1.4: Taristuinvesteeringud
erimajandustsoonis Siht
Erimajandustsooni taristuprojektide
lõpuleviimine
M6C1–3
Investeering 1.1: Kogukonna
tervisemajad territoriaalse tervishoiuabi
parandamiseks
Siht Aktiveeritakse kogukonna
tervisemajade teenused
M6C1–9 Investeering 1.2: Kodu kui esimene
hoolduskoht ja telemeditsiin Siht Abi telemeditsiini vahendite abil
M6C1–11 Investeering 1.3: Tugevdada
vahetasandi tervishoidu ja selle rajatisi Siht
Kogukonnahaiglate teenused on
aktiveeritud
474
Järjekorra-
number
Seotud meede (reform või
investeering)
Eesmärk/s
iht Nimetus
(kogukonnahaiglad)
M6C2–6
Investeering 1.1: Haiglate
tehnoloogiliste seadmete digitaalne
ajakohastamine
Siht
Tõend 3 100 diagnostikaseadme
kohaletoimetamise või katsetamise
kohta
M6C2–9
Investeering 1.1: Haiglate
tehnoloogiliste seadmete digitaalne
ajakohastamine
Siht
Intensiivravis ja poolintensiivses
hoolduses pakutavad või teisendatud
voodikohad
M6C2–10 Investeering 1.2: Ohutu ja jätkusuutliku
haigla suunas Siht
Antiseismiline sekkumine haiglates on
lõpule viidud
M6C2–10
bis
Investeering 1.2: Ohutu ja jätkusuutliku
haigla suunas Siht
Seaduse 67/88 artikli 20 kohaste
sekkumistega seotud toetus(ed)
M6C2–12
Investeering 1.3: Tehnoloogilise taristu
ning andmekogumise, andmetöötluse, -
analüüsi ja -simulatsiooni vahendite
tugevdamine
Eesmärk
Ravikindlustuskaardisüsteemi
komponentide, elektroonilise terviseloo
koostalitlusvõime taristu ja
„Ecosistema Dati Sanitari“
katsetamine.
M6C2–13
Investeering 1.3: Tehnoloogilise taristu
ning andmekogumise, andmetöötluse, -
analüüsi ja -simulatsiooni vahendite
tugevdamine
Siht Digitaalset terviselugu kasutatakse
enamiku terviselugude puhul
M7–37
Investeering 13: Aadria mere
torujuhtme 1. etapp (Sulmona
kompressorjaam ja Sestino-Minerbio
gaasijuhe)
Eesmärk Sulmona kompressorjaama ja Sestino
Minerbio gaasijuhtmete ehitustööd
M7–39 Investeering 14: Piiriülene
gaasiekspordi infrastruktuur Eesmärk
Poggio Renatico kompressorjaamas
tehtud tööd
M7–41 Investeering 15: Transizione 5.0 Siht
Ettevõtetele 2024.–2025. aastal esitatud
dokumentide alusel antud
maksukrediidid
M7–45
Investeering 16: Toetus VKEdele
taastuvatest energiaallikatest
omatarbeks toodetud energia tootmiseks
Siht Õiguslikud kokkulepped lõplike
abisaajatega
M7–49
Investeering 17: Rahastamisvahend
avaliku sektori elamute energiatõhusaks
renoveerimiseks
Siht Lõplike abisaajatega sõlmitud
õiguslikud kokkulepped
M1C3–29 Investeering 4.2: Turismiettevõtete
konkurentsivõime fondid Siht
Euroopa Investeerimispanga
temaatiliste fondide kaudu toetatavate
projektide arv
M3C2–9
Investeering 1.1: Rohelised sadamad:
taastuvenergia ja energiatõhususega
seotud sekkumised sadamates
Siht Kaupade tarnimine, ehitustööd ja
teenuste osutamine
M1C2–23a Investeering 4: Satelliittehnoloogia ja
kosmosemajandus Eesmärk
Satelliittehnoloogia ja
kosmoseprojektid
M1C3–16a Investeering 2.1: Väikeste ajalooliste
linnade atraktiivsus Siht Läbiviidud sekkumised
M1C3–17
Investeeringud – 2.2 Maapiirkondade
arhitektuuri ja maastiku kaitse ja
parandamine
Siht Läbiviidud sekkumised
M1C3–19 Investeering 2.4 – Päritolupaikade Siht Läbiviidud sekkumised
475
Järjekorra-
number
Seotud meede (reform või
investeering)
Eesmärk/s
iht Nimetus
turve, Fondo Edifici di Culto pärandi ja
kunstiteoste varjupaikade
restaureerimine (taastuskunst)
M2C1–10
Investeering 2.1: Põllumajandusliku
toidutööstuse, kalanduse ja
vesiviljeluse, metsanduse, lillekasvatuse
ja taimekoolide sektori logistikakava
Siht
Materiaalsed ja immateriaalsed
investeeringud põllumajandusliku
toidutööstuse, kalanduse ja
vesiviljeluse, metsanduse,
lillekasvatuse ja taimekoolide
sektorisse.
M2C1–
16quater
Investeering 1.1 – Uute
jäätmekäitlusrajatiste rakendamine ning
olemasolevate rajatiste ajakohastamine
ja ringmajanduse juhtprojektid
Siht Elluviidud projekt
M2C2–45
Investeering 1.1: Põllumajandusega
seotud päikeseenergiasüsteemide
arendamine
Eesmärk
Rakendusleping, lõplike abisaajatega
sõlmitud õiguslikud lepingud ja
investeeringute lõpuleviimine
M4C1–18
Investeering 1.1: Lasteaedu, eelkoole
ning alusharidust ja lastehoiuteenuseid
käsitlev kava
Siht Alushariduse ja lapsehoiu kohad 0–
6aastastele lastele.
M4C1–21 Investeering 1.2: Täistööajaga
töötamise pikendamise kava Siht
Söökla ehitamine ja/või renoveerimine
koolides
M4C1–26
Investeering 3.3: Koolihoonete
turvalisuse ja struktuurilise
rehabilitatsiooni kava
Siht Ohutust ja/või energiatõhusust
suurendavad sekkumised
M4C1–32 Investeering 5: Üliõpilaste
eluasemefond Eesmärk
Lõplike abisaajatega sõlmitud
juriidilised lepingud ja investeeringute
lõpuleviimine
M5C1–20 Investeering 5 – Naistele kuuluvate
ettevõtete loomine Siht
Üleviimine Invitaliasse ja lõplike
abisaajatega sõlmitud õiguslikud
kokkulepped
M5C2–6
Investeering 1 – Haavatavate inimeste
toetamine ja institutsionaliseerimise
ennetamine
Siht
Sotsiaalsetes piirkondades lõpule
viidud haavatavate inimeste toetamise
meetmed
M5C2–8 Investeering 2 – Puuetega inimeste
iseseisvuse mustrid Siht
Toetusesaajatele on antud juurdepääs
eluasemele ja/või IKT-seadmetele,
millega kaasneb digioskuste alane
koolitus
M5C2–10 Investeering 3 – Esmalt eluase ja
postijaamad Siht
Suures materiaalses puuduses elavad
inimesed, kes on projekti „Esmalt
eluase“ ja postijaamade eest vastutanud
vähemalt kuus kuud
M1C2–31 Investeering 7 – Riiklik ühenduvusfond Eesmärk
Lõplike abisaajatega sõlmitud
juriidilised lepingud ja investeeringute
lõpuleviimine
M1C2–32 Investeering 8 – InvestEU liikmesriigi
osa Eesmärk
Itaalia valitsuse ja Euroopa Komisjoni
vahelise toetuslepingu allkirjastamine
M1C2–33 Investeering 8 – InvestEU liikmesriigi
osa Siht
InvestEU investeeringute komitee poolt
heaks kiidetud rahastamis- või
investeerimistoimingud
M3C1–28 Investeering 1.10 –
Suurlinnatranspordisõlmede ning Siht 3 309 km ümberehitatud liinilõiku
476
Järjekorra-
number
Seotud meede (reform või
investeering)
Eesmärk/s
iht Nimetus
piirkondadevaheliste ja piirkondlike
raudteeliinide tugevdamine
M2C4–40 Investeering 4.5 – Veetaristusse
tehtavate investeeringute toetuskava Siht
Lõplike abisaajatega sõlmitud
juriidilised lepingud ja investeeringu
lõpuleviimine.
M1C2–34 Investeering 9 – Üleminek 4.0 –
laiendamine Siht
Üleminekuperioodi 4.0
maksusoodustused, mida antakse
ettevõtetele aastatel 2021–2026
esitatud dokumentide alusel
M2C1–27 Investeering 4: Põllumajandus-
päikesepargi rajatis Eesmärk
Lõplike abisaajatega sõlmitud
juriidilised lepingud ja investeeringute
lõpuleviimine
M2C4–39 Investeering 4.5 – Veetaristusse
tehtavate investeeringute toetuskava Eesmärk Rakenduskokkuleppe jõustumine
M2C2–54 Investeering 4.6 – Diagnostikarongid Siht Diagnostikarongid
Osamakse
summa 19 919 595 964 EUROT
477
LÕIK 3: TÄIENDAV TÕLKIMINE
1. Taaste- ja vastupidavuskava seire ja rakendamise kord
Itaalia taaste- ja vastupidavuskava seire ja rakendamine toimub järgmise korra kohaselt.
24. veebruari 2023. aasta dekreetseadusega nr 13 muudetud 31. mai 2021. aasta dekreetseaduse nr 77
kohaselt luuakse kava seireks ja rakendamiseks mitu koordineerimisstruktuuri. Nende hulka kuuluvad
eelkõige: i) ministrite nõukogu eesistumise ajal loodud kõrgetasemeline juhtkomitee (cabina di regia),
mille peamine ülesanne on juhtida ja koordineerida kava rakendamist; ii) ministrite nõukogu eesistuja
juures vähemalt kava kehtivusajaks loodud missiooni struktuur, mis on volitatud tegutsema kava
rakendamise ja järelevalve keskse koordineerimisstruktuurina; iii) majandus- ja
rahandusministeeriumi tehniline struktuur, mis teostab kava rakendamise operatiivjärelevalvet,
kontrollib menetluste ja kulude korrektsust ja aruandlust ning pakub rakendusetapile tehnilist ja
operatiivtuge. Ministrite nõukogu eesistumise juures moodustatud missiooni struktuur toimib riiklikul
tasandil Euroopa Komisjoni ühtse kontaktpunktina. Majandus- ja finantsministeerium tagab kava
tulemuste hindamise. Sotsiaalpartnerid ja muud sidusrühmad osalevad cabina di regia sihtpärastel
kohtumistel, et tagada nende osalemine kava rakendamises. Lisaks määratakse iga kavas sisalduvate
meetmete eest vastutava keskasutuse tasandil kindlaks koordineerimisstruktuurid, mille ülesandeks on
asjaomaste sekkumiste juhtimine, seire, aruandlus ja kontroll, sealhulgas hõlmates rakendamise
järelevalvet ning eesmärkide ja sihtide saavutamisel tehtud edusamme. Samuti on ette nähtud
jõustamismehhanismid rakendamisprobleemide puhuks, sealhulgas asendusvolituste aktiveerimine
kava meetmete eest vastutavate asutuste suhtes, et tagada projektide õigeaegne ja tõhus elluviimine
ning eelmehhanismid konfliktide lahendamiseks.
Seireks ja rakendamiseks vajaliku haldussuutlikkuse tugevdamiseks kavandatakse ajutiste töötajate
töölevõtmist, sealhulgas seoses kava rakendamise eest vastutavate keskasutuste ning majandus- ja
rahandusministeeriumiga (sealhulgas seoses keskse koordineerimisstruktuuri ja riigi
raamatupidamisarvestuse osakonnaga), nagu on sätestatud 9. juuni 2021. aasta dekreetseaduses nr 80,
ning seoses Lõuna-Itaalia ametiasutustega, mis eeldatavasti suurendavad töötajate arvu, kes tegelevad
ELi vahendite kavandamise ja kasutamisega, nagu on sätestatud eelkõige 2020. aasta seaduses nr 178.
Lisaks eraldatakse vahendeid ministrite nõukogu eesistumise juures moodustatud missiooni
struktuurile, et tagada tõhus toimimine vastavalt 24. veebruari 2023. aasta dekreet-seaduses nr 13
sätestatule. Lisaks on projektide rakendamisel kesksetele ja kohalikele ametiasutustele ette nähtud
tehniline ja operatiivtugi, sealhulgas kasutades avaliku sektori kapitaliühinguid, tehnilise abi eksperte
ja vajaduse korral välisekspertide abi. Nende meetmetega kaasneb halduskoormust vähendavate ja
haldusmenetlusi lihtsustavate meetmete rakendamine, nagu on sätestatud 31. mai 2021. aasta
dekreetseaduses nr 77 ja 24. veebruari 2023. aasta dekreet-seaduses nr 13.
Korraldusega nähakse ette ka integreeritud IT-süsteemi („Regis“) kasutamine. Majandus- ja
rahandusministeeriumi juures tegutseva Euroopa Liiduga finantssuhete arendamise peainspektsiooni
(IGRUE) ülesandeks on koordineerida auditisüsteeme ja teostada kontrolle riigi territoriaalse
arvepidamise büroo (RTS) toel. Guardia di Finanza ja asjaomaste sõltumatute asutustega, nagu riiklik
korruptsioonivastane amet ANAC sõlmitud tõhustatud kokkulepped jäävad kehtima, tugevdades seega
rolli, mille Itaalia õigussüsteem kõnealustele asutustele seoses riigi rahanduse, sealhulgas EList pärit
rahastuse kaitsega juba omistab.
478
2. Komisjoni jaoks alusandmetele täieliku juurdepääsu andmise kord
Selleks et anda komisjonile täielik juurdepääs asjakohastele alusandmetele, kehtestab Itaalia järgmise
korra.
Majandus- ja rahandusministeerium tegutseb tehnilise struktuurina, mis teostab seiret, sealhulgas
eesmärkide ja sihtide saavutamisel tehtud edusammude üle, ning vajaduse korral rakendab kontrolli-
ja auditeerimistegevust, ning esitab aruandeid ja maksetaotlusi. Ta koordineerib aruandlust
eesmärkide ja sihtide, asjakohaste näitajate, aga ka kvalitatiivse finantsteabe ja muude andmete,
näiteks toetuse lõplike saajate kohta. Andmed kodeeritakse kava meetmete eest vastutavate
keskasutuste tasandil, kes esitavad nõutud andmed majandus- ja rahandusministeeriumile. Kooskõlas
määruse (EL) 2021/241 artikli 24 lõikega 2 esitab Itaalia pärast käesoleva lisa punktis 2.1 esitatud
asjakohaste kokkulepitud eesmärkide ja sihtide saavutamist komisjonile nõuetekohaselt põhjendatud
taotluse rahalise toetuse ja vajaduse korral laenu saamiseks. Itaalia tagab, et komisjonil on taotluse
korral täielik juurdepääs asjakohastele alusandmetele, mis toetavad maksetaotluse nõuetekohast
põhjendust, nii maksetaotluse hindamiseks vastavalt määruse (EL) 2021/241 artikli 24 lõikele 3 kui ka
auditi ja kontrolli eesmärgil.