| Dokumendiregister | Riigi Tugiteenuste Keskus |
| Viit | 11.1-3/26/1877-1 |
| Registreeritud | 11.09.2026 |
| Sünkroonitud | 18.09.2026 |
| Liik | Väljaminev kiri |
| Funktsioon | 11.1 Toetuste arendamine, sertifitseerimine ja järelevalve 2025- |
| Sari | 11.1-3 Euroopa majanduspiirkonna ja Norra finantsmehhanismi kirjavahetus 1.1 |
| Toimik | 11.1-3/2026 |
| Juurdepääsupiirang | Avalik |
| Adressaat | |
| Saabumis/saatmisviis | |
| Vastutaja | Liina Thalfeldt (Riigi Tugiteenuste Keskus, Peadirektori asetäitjale alluvad osakonnad, Toetuste maksete osakond, Norra ja Euroopa Majanduspiirkonna sertifitseeriv asutus) |
| Originaal | Ava uues aknas |
| Taotle dokumendi eemaldamist või parandamist |
Version 1.0 as of 10/09/2026 16:11:13 CEST 1
Interim financial report EEA Financial Mechanisms 2021-2028 Interim financial report number 1 Programme summary
Programme operator Ministry of Interior Beneficiary State Estonia Programme title Crisis Preparedness Programme code EE-PREPARED Eligible Expenditure € 16,444,235.29 Programme grant rate 100.00 % Programme grant amount € 13,992,000.00 EEA Grant Amount € 13,992,000.00 Norway Grant Amount € 0.00 Start date of eligibility 28/05/2025 Final date of eligibility 30/04/2032
Version 1.0 as of 10/09/2026 16:11:13 CEST 2
Part A - Statement of expenditure declared and interest earned/paid
Declared expenditure - summary Interim financial report number 1 Start date of declared expenditure period 28/05/2025 End date of declared expenditure period 30/06/2026
Previously declared expenditure
Declared expenditure for the period
Total declared to date
Total budget Available budget
Eligible expenditure € 0.00 € 0.00 € 0.00 € 16,444,235.29 € 16,444,235.29
EEA Grants € 0.00 € 0.00 € 0.00 € 13,992,000.00 € 13,992,000.00 Co-financing € 0.00 € 0.00 € 0.00 € 2,452,235.29 € 2,452,235.29
Declared expenditure - details Title: Programme management Brief description of declared expenditure
Eligible expenditure for the period is 1,659.19 EUR (Gender Equality training two PO advisors in BRU). The cost will be declared in the next IFR as the domestic procedure is taking longer than expected.
Eligible expenditures Eligible expenditure - EUR
€ 0.00 Total
€ 0.00
Title: Outcome 1: Strengthened institutional and societal capacity for civil protection, disaster preparedness, and resilience in safeguarding cultural heritage (EEA Grants) Brief description of declared expenditure
No payments made.
Title: Outcome 2: Strengthened resilience and inclusive participation of civil society and local communities in crisis preparedness and governance (EEA Grants) Brief description of declared expenditure
No payments made.
Title: Bilateral Outcome: Bilateral funds at programme level Brief description of declared expenditure
No payments made.
Eligible expenditures Eligible expenditure - EUR
€ 0.00 Total
€ 0.00
Interest earned Interest paid on accounts established by the Programme Operator for funds intended for regranting in the current reporting period.
EEA Grants Total € 0.00 € 0.00
Version 1.0 as of 10/09/2026 16:11:13 CEST 3
Cumulative interest generated on accounts established by the Programme Operator for funds intended for regranting.
EEA Grants Total € 0.00 € 0.00
Interest paid Interest generated on accounts established by the Programme Operator for funds intended for regranting in the current reporting period.
EEA Grants Total € 0.00 € 0.00
Cumulative interest paid on accounts established by the Programme Operator for funds intended for regranting.
EEA Grants Total € 0.00 € 0.00
Comment No payments made.
Version 1.0 as of 10/09/2026 16:11:13 CEST 4
Part B - Statement of expenditure proposed
Proposed expenditure - summary Start date of proposed expenditure period 01/01/2027 End date of proposed expenditure period 30/06/2027
Previous advance and interim payments
Proposed expenditure for the period
Total to date Total budget Available budget
Eligible expenditure € 0.00 € 764,000.00 € 764,000.00 € 16,444,235.29 € 15,680,235.29
EEA Grants € 0.00 € 653,000.00 € 653,000.00 € 13,992,000.00 € 13,339,000.00 Co-financing € 0.00 € 111,000.00 € 111,000.00 € 2,452,235.29 € 2,341,235.29
Title: Programme management Brief description of declared expenditure PO staff cost and Implenting Agency service.
Previous advance and interim payments
Proposed expenditure for the period
Total to date Total budget Available budget
Eligible expenditure € 0.00 € 90,000.00 € 90,000.00 € 694,235.29 € 604,235.29
* For management costs it is not possible to request more than € 624,811.76 of the total amount as 10.00 % is retained for the programme closure. Title: Outcome 1: Strengthened institutional and societal capacity for civil protection, disaster preparedness, and resilience in safeguarding cultural heritage (EEA Grants) Brief description of declared expenditure Planned activities of PDP 1 "Crisis Preparedness" and PDP 2 "Protection of Cultural Heritage".
Previous advance and interim payments
Proposed expenditure for the period
Total to date Total budget Available budget
Eligible expenditure € 0.00 € 400,000.00 € 400,000.00 € 12,313,064.71 € 11,913,064.71
Title: Outcome 2: Strengthened resilience and inclusive participation of civil society and local communities in crisis preparedness and governance (EEA Grants) Brief description of declared expenditure Planned activities of Outcome 2 (Strengthened resilience and inclusive participation of civil society and local communities in crisis preparedness and governance).
Previous advance and interim payments
Proposed expenditure for the period
Total to date Total budget Available budget
Eligible expenditure € 0.00 € 250,000.00 € 250,000.00 € 3,340,935.29 € 3,090,935.29
Title: Bilateral Outcome: Bilateral funds at programme level Brief description of declared expenditure Event in Norway, oct 2026.
Previous advance and interim payments
Proposed expenditure for the period
Total to date Total budget Available budget
Eligible expenditure € 0.00 € 24,000.00 € 24,000.00 € 96,000.00 € 72,000.00
Version 1.0 as of 10/09/2026 16:11:13 CEST 5
Part C - Forecast Allocation
(a)
Estimated absorption rate
(b)
Paid 2025 (c1)
Paid Jan-Jun
2026 (d)
Jul-Dec 2026 (e)
Payment current 2026
(f)=(d)+(e)
Payment 2027 (g)
Payment until the end of the FM
(h)=(i)-sum(cn)-(f)-(g)
Total forecast (i)=(a)*(b)
Total by programme € 13,992,000.00 100.00 % € 0.00 € 0.00 € 653,000.00 € 653,000.00 € 900,000.00 € 12,439,000.00 € 13,992,000.00 EEA Grants € 13,992,000.00 100.00 % € 0.00 € 0.00 € 653,000.00 € 653,000.00 € 900,000.00 € 12,439,000.00 € 13,992,000.00
Version 1.0 as of 10/09/2026 16:11:13 CEST 6
Programme operator Full legal name: Ministry of Interior (EE) Programme operator signature I certify that I am duly authorised to sign this interim financial report and that the proposed expenditure described in Part B from which this interim payment is calculated is a realistic estimate of the expenditure that will actually be required by the Programme in the period referred to in Part B. I have thoroughly reviewed the expenditure declared in Part A, and co - financing provided in Part B of this report, and confirm that the information provided is accurate. I confirm that this Programme is carried out as described in the Programme Agreement and that the declared expenditure is correctly represented. Overall implementation status (including milestones): Overall, the implementation is on track and moving forward.
Question Answer Comment
Were monitoring and verifications conducted to ensure quality and/or regularity of implementation?
N/A
No payments have been made for outcomes. Only costs have been incurred for PO management costs, which will be declared in the next IFR.
Are project-level information in Grace updated with the most recent financial data?
N/A No payments have been made for outcomes.
Are all the irregularities, their investigation and any remedies taken reported?
N/A There have been no irregularities.
Are the special conditions and programme-specific rules set out in the programme agreement fulfilled (Art 5.6.1 (x))?
No The special conditions set out in the programme agreement were not yet met in the declared expenditure period of IFR.
Do you consider the collaboration with the IPO in its role as IPO at programme level to be working well?
N/A IPOs are not foreseen in the programme.
Are you aware of any issues affecting the collaboration with the IPO(s) as partner(s) in pre-defined project(s)?
N/A IPOs are not foreseen in the programme.
For the Programme Operator
Signed in ............................. on ................
...................................................................
Version 1.0 as of 10/09/2026 16:11:13 CEST 7
Certification of expenditure declared and co-financing Interim financial report number 1 Start date of declared expenditure period 28/05/2025 End date of declared expenditure period 30/06/2026 Expenditure declared this period € 0.00 Start date of proposed expenditure period 01/01/2027 End date of proposed expenditure period 30/06/2027 Expenditure proposed this period € 764,000.00 Cumulative co-financing reported to date (part A) € 0.00 Cumulative co-financing planned (including proposed amount in part B) € 111,000.00 Interest earned (current reporting period) € 0.00 Total interest earned € 0.00 Interest paid (current reporting period) € 0.00 Total interest paid € 0.00 The Certifying Authority hereby certifies that: - for incurred expenditure and fulfilment of conditions for simplified cost options (SCOs): a. the supporting documents for incurred expenditure and fulfilment of conditions for SCOs have been examined and found to be authentic, correct and accurate; b. payments to projects have been executed as reported; c. co-financing in relation to declared expenditure has been paid; d. when relevant, that the interest to date has been reported in the relevant Interim Financial Reports; e. the expenditure included in the report have been reported within the 12 months of the end of the reporting period in which it should have been declared. - for incurred expenditure: f. the summary of eligible expenditure submitted by the Programme Operator is in full conformity with the supporting documents; g. the summary of eligible expenditure is based on verifiable accounting which is in compliance with generally accepted accounting principles and methods; h. the summary of eligible expenditure falls within eligible expenditure under the Regulation for the implementation of the EEA / Norwegian Financial Mechanisms 2021-2028; i. the summary of expenditure is incurred as part of the implementation of the Programme in accordance with the Programme Agreement; j. sufficient audit trail exists. For the Certifying Authority
Signed in ............................. on ................
...................................................................
Lisa Kontroll-leht Norra/EMP 2021-2028 programmi finantsvahearuandele
Nr:11.1-3/26/1877-1
Täitmist alustatud:11.09.2026
PO/RÜ: Siseministeerium/Riigi Tugiteenuste Keskus
Programm: EE-Crisis Preparedness
Aruandlusperiood: 28.05.2025-30.06.2026
Finantsvahearuanne nr: IFR#1
Sertifitseerimisasutusele (SA) esitamise kuupäev: 10.09.2026 GrACE sisestatud: 10.09.2026
Kesksüsteemi SFCS väljavõtted (SAP BO aruanded)1: SF08, SF17, SF19, SF110, KASSA005 genereerimise info
Programmi EE-TA (tehniline abi) kontroll2
1. PART A - juhtimiskuludeks eraldatud vahendite ja
kuludokumentide nimekirja kontroll3
JAH
EI
N/A
Märkused/ selgitused
1.1.
SFOSis juhtimiskulude kuludokumentide
nimekirjas toodud kulutuste puhul märgitud
tegevus ja selgitus on kooskõlas programmi
juhtimiskulude eelarve ja abikõlblikkuse
reeglitega.
N/A
1.2. Toodud kulud on tekkinud programmi
abikõlblikkuse perioodil. N/A
1.3. Juhtimiskulud on kajastatud finantsvahearuandes
vastavalt väljavõttele SF08. N/A
1.4. Kui tegemist on riigiasutusega on väljavõte SF19
kooskõlas SAPi andmetega. N/A
1.5.
Aruandlusperioodil tehtud finantskorrektsioonid
on kajastatud veerus adjustment kooskõlas
kesksüsteemi väljavõttega SF33
N/A
2. PART A – projektidele eraldatud vahendid4
2.1. Kesksüsteemi väljavõtte SF08 projektidele
eraldatud vahendite väljamakstud koondsumma
vastab summale, mis on tegelikult välja makstud.
Summad võivad erineda tagasinõuete ja ekslikult
kantud summade ümberpaigutamise võrra.
N/A
2.2. Kesksüsteemi väljavõte SF08 vastab outcome’ide
lõikes finantsvahearuandes kajastatud summadele;
N/A
2.3. Kesksüsteemi väljavõte SF33 vastab outcome’ide
lõikes veerus adjustments kajastatud summadele;
N/A
2.4. Toetuse määr vastab projekti lepingule N/A
2.5. Finantsvahearuandes ei ületa väljamaksete
koondsumma eelarves olevaid summasid
outcome’ide lõikes.
N/A
2.6. PO/RÜ esitatud kinnitused vastavad SA-le teada
oleva info põhjal tegelikkusele.
N/A
2.7. Perioodi 1.07-31.12 finantsvahearuandes on
kajastatud lõppenud aastal PO kontol teenitud
intressid ning info vastab e-riigikassale.
N/A
3. Kulude maha arvamine
3.1. Aruandlusperioodil tehtud finantskorrektsioonid
on kajastatud finantsvahearuandes ja on kooskõlas
SAP BO aruandega SF33
N/A
3.2. Muu saadud info alusel on sertifitseerimise
peatamised finantsvahearuandes kajastatud.
N/A
1 Elektroonne väljavõte 2 EE_TA programmis on fikseeritud kindlasummalised maksed, kontrolli IFR vs SAP BO ei teostata 3 EE_BF kahepoolsete suhete fondi puhul RKA enda kulud 4 EE_BF kahepoolsete suhete fondi puhul outcome’ide asemel asutuste lõikes
4. PART B – ettemaksu deklareerimine
4.1. Kulude ettemaksu taotlemine outcome’ide lõikes
on põhjendatud ja kooskõlas planeeritud
tegevustega.
JAH
5. PART C – prognoos
5.1. Prognoositavad toetussummad aastate lõikes on
reaalsed ja põhjendatud.
JAH
6. PO finantsvahearuande tehniline kontroll
6.1. Finantsvahearuande periood vastab esitatud
perioodile.
JAH
6.2. PO/RÜ poolt GRACE süsteemi sisestatud info
vastab SFOS-ile ja e-riigikassale.
JAH
Lõppjäreldus PO/RÜ finantsvahearuande osas: Kulusid raporteeritud ei ole. Kinnitada IFR#1PartB alusel küsitud
ettemaks EUR 764 000.00
Kontroll-lehe täitja: Liina Thalfeldt
TMO finantsspetsialist Nimi /allkirjastatud digitaalselt/
Kontroll-lehe kinnitaja: Karin Viikmaa TMO osakonnajuhataja Nimi /allkirjastatud digitaalselt/
Kontroll-lehe kinnitaja: Pärt-Eo Rannap
RTK peadirektor (SA juhataja) Nimi /allkirjastatud digitaalselt/