| Toimik | KOMISJONI ARUANNE NÕUKOGULE JA EUROOPA PARLAMENDILE nõukogu direktiivi 2011/70/Euratom rakendamise kohta ning ülevaade ühenduse territooriumil olevate kasutatud tuumkütuse ja radioaktiivsete jäätmete kohta ja osutatud materjalide tekkimise tulevikuprognoos NELJAS ARUANNE - SWD(2026) 285, SWD(2026) 286, COM(2026) 512 |
| Juurdepääsupiirang | Avalik |
| Adressaat | |
| Saabumis/saatmisviis | |
| Vastutaja | |
| Originaal | Ava uues aknas |
| Taotle dokumendi eemaldamist või parandamist |
EN EN
EUROPEAN COMMISSION
Brussels, 29.9.2026 COM(2026) 512 final
REPORT FROM THE COMMISSION TO THE COUNCIL AND THE EUROPEAN
PARLIAMENT
on progress of implementation of Council Directive 2011/70/EURATOM and an
inventory of radioactive waste and spent fuel present in the Community's territory and
the future prospects
FOURTH REPORT
{SWD(2026) 285 final} - {SWD(2026) 286 final}
2
1 INTRODUCTION ............................................................................................................... 3
2 RADIOACTIVE WASTE AND SPENT FUEL IN THE EUROPEAN UNION ............... 4
2.1 Origin of radioactive waste and spent fuel ................................................................. 4
2.2 Inventory estimates ..................................................................................................... 4
3 SAFE AND RESPONSIBLE MANAGEMENT OF RADIOACTIVE WASTE AND
SPENT FUEL ...................................................................................................................... 5
3.1 National frameworks and programmes ...................................................................... 5
3.2 Competent authorities ................................................................................................. 6
3.3 Circularity and disposal policies ................................................................................ 6
3.4 Cost assessments and financing ................................................................................. 7
3.5 Programme monitoring and reporting ........................................................................ 7
3.6 Transparency and public participation ....................................................................... 7
4 CONCLUSIONS ................................................................................................................. 8
3
1 INTRODUCTION
Under Article 14(2) of Council Directive 2011/70/Euratom (1) on the responsible and safe
management of spent fuel (2) and radioactive waste (3) (‘the Directive’), the Commission has
to regularly submit the following to the European Parliament and Council:
• a report on progress made with the implementation of the Directive;
• an inventory of radioactive waste and spent fuel present in the European Atomic
Energy Community’s (‘the Community’) territory and the future prospects.
The information presented is based on Member States’ national reports, which are due every
three years as per Article 14(1) of the Directive; the last reporting deadline for Member States
was 23 August 2024. This fourth report covers the 2021-2023 period. The report is
accompanied by two staff working documents:
• one presenting the overall situation in the Community based on the Commission’s
analyses of the national reports;
• one presenting the Community’s inventory of radioactive waste and spent fuel and
future prospects, with a reference date of December 2023.
The Commission previously presented three progress reports – in 2017, 2019 and 2024, each
providing a comprehensive overview on the implementation of Directive. This report
describes few changes or developments compared with the situation presented in the 2024
report (4); therefore, most of Commission’s conclusions remain valid. In 2025, the
Commission launched the evaluation of the Directive, along with the evaluation of Council
Directive 2006/117/Euratom on the supervision and control of shipments of radioactive waste
and spent fuel (5).
Section 2 provides an overview of radioactive waste and spent fuel inventories in the
Community. Section 3 summarises the assessment of the current state of implementation of
national frameworks and programmes under the Directive, highlighting recent progress and
unresolved challenges.
(1) Council Directive 2011/70/Euratom of 19 July 2011 establishing a Community framework for the responsible and safe management
of spent fuel and radioactive waste (OJ L 199, 2.8.2011, p. 48, ELI: http://data.europa.eu/eli/dir/2011/70/oj). (2) Spent fuel is ‘nuclear fuel that has been irradiated in and permanently removed from a reactor core’ (Article 3(11) of the Directive)
and that is no longer usable in its current form. It is generated by the operation of nuclear reactors for power generation, research,
training and demonstration. (3) Radioactive waste is ‘radioactive material in gaseous, liquid or solid form for which no further use is foreseen or considered’
(Article 3(7) of the Directive) and which has been classified as radioactive waste. Its generation is associated with the production of
electricity in nuclear power plants or with non-power-related uses of radioactive materials for medical, research, industrial and agricultural purposes. See SWD(2026) 286 on progress on implementation of Council Directive 2011/70/Euratom for the definitions
of others important concepts set out in the Directive, such as storage and disposal. (4) Report from the Commission to the Council and the European Parliament on progress of implementation of Council Directive
2011/70/EURATOM and an inventory of radioactive waste and spent fuel present in the Community’s territory and the future prospects, Third Report, https://ec.europa.eu/transparency/documents-register/detail?ref=COM(2024)197&lang=en
(5) This evaluation process involved also Call for Evidence and Public Consultation (2026): https://ec.europa.eu/info/law/better-
regulation/have-your-say/initiatives/14619-Radioactive-Waste-Directive-and-Shipments-Directive-evaluation_en
4
2 RADIOACTIVE WASTE AND SPENT FUEL IN THE EUROPEAN UNION
2.1 Origin of radioactive waste and spent fuel
All Member States generate radioactive waste through a range of activities, from medical
applications to electricity generation. Most radioactive waste comes from nuclear power
plants and associated nuclear fuel cycle activities, while the non-power use of radioactive
materials generates smaller volumes of radioactive waste.
Each Member State determines its own electricity generation mix. In 2023, nuclear power
plants were in operation in 12 countries (6). Three others – Germany, Italy and Lithuania –
had ended their nuclear power programmes and were decommissioning their nuclear
installations.
In 2023, 101 nuclear power reactors were in operation (7), 74 nuclear power reactors had been
permanently shut down and were being decommissioned, and 3 nuclear power reactors had
been fully decommissioned. In addition, 30 research reactors were in operation in 12
countries (8).
In total, 17 Member States currently manage spent nuclear fuel on their territory.
The decommissioning of nuclear power plants is a major activity for the European nuclear
industry. Decommissioning of nuclear facilities is ongoing in a quarter of the Member States,
and the volume of radioactive waste from decommissioning is increasing.
2.2 Inventory estimates
By the end of 2023, the estimated total inventory of radioactive waste in the EU was
2 593 000 m3 (an 11% increase since the previous reporting period, corresponding to an
average yearly production of less than 65 000 m3). Table 1 shows the overview of the amount
of radioactive waste in 2023 compared with 2019. Approximately 66% (1 692 000 m3) of this
waste had been disposed of, and 34% (901 000 m3) was in storage and still required further
management. By the end of 2023, the amount of radioactive waste in the 15 Member States
with nuclear power programmes (9) accounted for 99.5% of the total volume of radioactive
waste inventory in the EU.
Most Member States have presented their radioactive waste inventories using the
classification scheme set out in the International Atomic Energy Agency (IAEA) safety guide
GSG-1 (10) or have provided matrices enabling data to be converted from their national
classification scheme into the classification scheme recommended by the IAEA. Most
(6) Belgium, Bulgaria, Czechia, Finland, France, Hungary, the Netherlands, Romania, Slovakia, Slovenia, Spain and Sweden. In
addition, although it has no nuclear power plant within its own national borders, Croatia co-owns the Krsko nuclear power plant with Slovenia
(7) See IAEA Power Reactor Information System: https://www.iaea.org/pris.
(8) See IAEA Research Reactor Database: https://nucleus.iaea.org/rrdb/home#/home.
(9) Belgium, Bulgaria, Czechia, Finland, France, Germany, Hungary, Italy, Lithuania, the Netherlands, Romania, Slovakia, Slovenia,
Spain and Sweden. (10) ‘Classification of Radioactive Waste’, General Safety Guide, IAEA, Vienna, 2009.
5
countries also used the harmonised set of data for reporting national inventories, which was
prepared jointly by the Commission, the IAEA and the OECD Nuclear Energy Agency.
Data show that in those countries where disposal routes are open for very-low-level waste
(VLLW) and low-level waste (LLW), the process from generation to disposal appears to
generally function well. This is not the case for intermediate-level waste (ILW), high-level
waste (HLW) and spent fuel, as there are currently no operational disposal facilities to handle
these categories.
Table 1: Volume of radioactive waste in the EU in 2019 and 2023.
Waste EU radioactive waste amounts (m3, rounded to thousands*)
Class Stored Disposed Total
Year 2019 2023 2019 2023 2019 2023
VLLW 233 000 303 000 462 000 558 000 695 000 861 000
LLW 353 000 381 000 1 068 000 1 109 000 1 421 000 1 491 000
ILW 191 000 211 000 22 000 25 000 213 000 236 000
HLW 4 800 5 200 0 0 4 800 5 200
Total (m3) 782 000 901 000 1 552 000 1 692 000 2 334 000 2 593 000
* Except for HLW, which is rounded to hundreds.
By the end of 2023, approximately 59 500 tHM of spent fuel was stored in the EU (an
increase of approximately 6% from 2019). All spent fuel in the EU is currently in storage, as
no civil disposal facility for spent fuel is in operation anywhere in the world. There are still
small amounts of spent fuel that are sent for reprocessing outside the EU; therefore,
radioactive waste resulting from reprocessing is expected to be returned latest in the next
decades.
3 SAFE AND RESPONSIBLE MANAGEMENT OF RADIOACTIVE WASTE AND
SPENT FUEL
3.1 National frameworks and programmes
Across the EU, national frameworks have generally continued to improve in recent years; the
self-assessments, strengthened by international peer reviews, have proven to be one of the
driving forces behind these positive developments.
One key obligation under the Directive is the development of a national programme – a
national strategic roadmap or plan setting out how national policies are being or will be
implemented. All Member States have national programmes in place and are continuously
developing them. During the reporting period, 11 Member States notified the Commission of
their updated national programmes. However, there were also cases where Member States did
not review and update national programmes as regularly as set out in their national legislation.
The steady implementation of national programmes and their prompt updating when needed
are hallmarks of responsible management of radioactive waste and spent fuel. This requires
Member States to optimise planning, commit sufficient resources, carry out the required
research and training activities and secure engagement with the public and other stakeholders.
6
There are no ongoing infringements related to transposition of the Directive and national
frameworks. However, during the previous reporting cycles, the Commission had to initiate
several procedures against some Member States regarding the implementation of the Directive
and on the compliance of their national programmes with the Directive’s requirements. By the
end of 2025, there were 16 ongoing infringement procedures (11).
3.2 Competent authorities
Competent regulatory authorities are granted technical and financial independence, based on
the information provided in national reports.
Adequate staffing of regulators is essential for the safe and effective rollout of national
programmes. The recent renewed interest and investments in nuclear energy projects means
that Member States need to anticipate strengthening their competent authorities, including for
the safe management of radioactive waste and spent fuel. The Commission has provided an
analysis of the needs related to new reactors and long-term operations in the latest nuclear
illustrative programme (PINC) (12), keeping in mind that different Member States have
different administrative approaches.
3.3 Circularity and disposal policies
The generation of radioactive waste, as well as amount of radioactive waste to be disposed
should be kept to the minimum which is reasonably practicable. The options as clearance of
materials from regulatory control and their subsequent reuse or recycling are particularly
apparent in ongoing decommissioning activities.
While most Member States plan to dispose of radioactive waste and spent fuel in their
territory, not all of them have made their final decision and some are still considering the
possibility of joint multinational disposal solutions. The Commission has carried out the pilot
project ‘Proposal for a Joint European Approach towards Radioactive Waste’ (13), involving
as many national authorities as possible in setting up a forum to discuss potential joint
solutions to waste management in Europe.
Member States with nuclear power programmes intend to dispose of their spent fuel in deep
geological facilities. Some countries are reprocessing their spent fuel, while others are
keeping that option open.
The first spent fuel disposal facility is scheduled to begin operations in Finland by 2027. In
Sweden and France, investment projects for the construction of similar facilities are under
way and expected to be completed in the next decade. Compared with the previous report,
(11) Austria, Belgium, Bulgaria, Denmark, Germany, Estonia, Ireland, Greece, Croatia, Italy, Latvia, Lithuania, Netherlands, Portugal
Romania and Slovenia. (12) Communication from the Commission, Nuclear Illustrative Programme presented under Article 40 of the Euratom Treaty – Final
(after the opinion of the EESC), COM/2026/120 final of 10.3.2026, https://eur-lex.europa.eu/legal-
content/EN/TXT/?uri=celex:52026DC0120.
(13) Based on the initiative from Members of the European Parliament, the financing was included in the EU budget.
https://energy.ec.europa.eu/document/download/b74f0a8f-ef96-45ce-8301-
5c8d86b9c5d1_en?filename=C_2023_4577_1_EN_annexe_acte_autonome_nlw_part1_v1.pdf
7
more Member States are actively working on different preparatory stages for deep geological
facilities. The envisaged dates for commissioning most deep geological repositories for high-
level waste and spent fuel currently fall between 2050 and 2075.
3.4 Cost assessments and financing
Nearly all Member States provided information on the cost assessment of their national
programmes. In 2023, the assessed total cost of management of radioactive waste and spent
fuel (14) in the EU remained around EUR 300 billion, in line with the Commission’s previous
reports.
The national estimates vary widely in terms of methodology, assumptions, completeness of
data, scope and time frames because different national circumstances require different
domestic approaches. To achieve a higher level of transparency and greater security of
funding, the Commission is working with Member States through the Nuclear Backend
Financial Aspects expert group (15) to provide guidance on reporting the costs of national
programmes for radioactive waste and spent fuel management.
Most Member States also provided information on the financing schemes for implementing
national programmes, taking into account the responsibility of spent fuel and radioactive
waste generators. There are considerable differences in these schemes, with a few Member
States relying on a fee levied on electricity generation, others on payments based on
characteristics of the waste, and some on state budget.
As expenditure is typically incurred only after the use of radioactive materials or nuclear fuel
– in some cases several decades later – back-end costs must be taken into account at an early
stage of new nuclear activities. In the PINC, the Commission pointed out that government
commitment and adequate funding from waste generators for effective decommissioning and
responsible management of radioactive waste and spent fuel is key to ensuring safety and
continued public support for the use of nuclear energy.
3.5 Programme monitoring and reporting
Several Member States have made progress in using key performance indicators to monitor
implementation of national programmes. However, challenges remain in ensuring effective
progress monitoring and performance reporting.
Reporting on the research, development and demonstration activities that are needed to
implement solutions for the management of radioactive waste and spent fuel was, in most
cases, very general. Member States are encouraged to provide more specific and targeted
information on those activities. The Commission notes positively that most Member States
make use of the ongoing European Partnership on Radioactive Waste Management (16).
(14) Estimated total cost of radioactive waste management’ means the aggregated total cost of all the EU Member States’ national
programmes covering all types of spent fuel and radioactive waste under their jurisdiction and all stages of spent fuel and radioactive
waste management from generation to disposal. (15) https://ec.europa.eu/transparency/expert-groups-register/screen/expert-groups/consult?lang=en&groupID=3777.
(16) https://www.ejp-eurad.eu/.
8
3.6 Transparency and public participation
Member States have not reported major updates on measures and approaches to transparency
and public participation. The Commission reiterates the importance of implementing the
transparency and public participation requirements effectively, including by providing
specific information on practices when reporting to the Commission.
4 CONCLUSIONS
During the reporting period radioactive waste and spent fuel were managed safely in Member
States. National frameworks and programmes are in place across the EU and were generally
set up in a transparent and participative manner. All Member States should make sure that
their national programmes are up to date. The system of self-assessments and international
peer reviews appeared consistent with the needs and is driving updates and continuous
improvement in waste management.
For the largest share of radioactive waste by volume, safe solutions for management
(including disposal) were pursued, as once again demonstrated by the increase in disposed
volumes against the decrease in stored volumes. Overall, most Member States are working to
develop disposal facilities. However, several still lack clearly defined management strategies
for radioactive waste and spent fuel, which hampers their progress.
The monitoring and funding of Member States’ national programmes remain the main
unresolved issues requiring the attention of national authorities. Cost assessments are
sometimes outdated or not comprehensive enough. This can affect the effectiveness of
financing schemes and create the risk that they will be insufficient to cover future costs,
thereby placing an undue burden on future generations. There are already ongoing activities
relating to guidance on reporting the costs of national programmes (17). However, there are
additional areas where more specific reporting criteria would support Member States in
preparing their national reports.
(17) Nuclear Back-end Financial Aspects expert group Draft the guidelines on reporting on the costs related to
the national programme on spent fuel and radioactive waste management https://ec.europa.eu/transparency/expert-groups-register/screen/expert-
groups/consult?lang=en&groupID=3777
EN EN
EUROPEAN COMMISSION
Brussels, 29.9.2026 SWD(2026) 285 final
COMMISSION STAFF WORKING DOCUMENT
Inventory of radioactive waste and spent fuel present in the Community's territory and
the future prospects
Accompanying the document
REPORT FROM THE COMMISSION TO THE COUNCIL AND THE EUROPEAN
PARLIAMENT
on progress of implementation of Council Directive 2011/70 EURATOM and an
inventory of radioactive waste and spent fuel present in the Community's territory and
the future prospects - FOURTH REPORT
{COM(2026) 512 final} - {SWD(2026) 286 final}
1
TABLE OF CONTENTS
List of abbreviations ................................................................................................................... 2
1. Introduction ........................................................................................................................ 3
2. Sources of information ....................................................................................................... 3
3. Sources of radioactive waste and spent fuel ....................................................................... 6
4. Classification of radioactive waste and spent fuel ............................................................. 7
5. Current radioactive waste and spent fuel inventory in the European Union ...................... 8
6. Projections of radioactive waste and spent fuel ............................................................... 25
Annex I: Radioactive waste and spent fuel inventory data ...................................................... 29
2
List of abbreviations
DSRS Disused sealed radioactive sources
EU European Union
HLW High-level waste
IAEA International Atomic Energy Agency
ILW Intermediate-level waste
LLW Low-level waste
NORM Naturally occurring radioactive material
RAW Radioactive waste
SF Spent fuel
tHM Tons of heavy metal
VLLW Very low-level waste
3
1. Introduction
According to Article 14(2)(b) of Council Directive 2011/70/Euratom1, which establishes a
Community framework for the responsible and safe management of spent fuel and radioactive
waste (‘the Directive’), the European Commission (‘the Commission’), on the basis of the
Member States’ reports, is to submit to the European Parliament and the Council an inventory
of radioactive waste and spent fuel present in the Community’s territory and its future
prospects.
The goal of this Staff Working Document (SWD) is to present an overview of radioactive
waste and spent fuel inventory in the European Union, as well as its future prospects,
and to provide background information to the inventory data presented in the Fourth Report
from the Commission to the Council and the European Parliament on the progress of
implementation of Council Directive 2011/70/Euratom, and an inventory of radioactive waste
and spent fuel present in the Community’s territory, along with its future prospects
(COM(2026) 512).
This fourth SWD includes inventory data as of the end of 2023, although a few Member
States reported inventory as of end-2022 or as of mid-2024 (more information on the
inventory dates are provided in Chapter 2 – Sources of information). The document provides
an overview of:
• the total radioactive waste and spent fuel inventory on EU territory as of the end of 2023;
• a forecast of the EU inventory for 2030, based on available information reported by
Member States;
• updated trends of radioactive waste and spent fuel inventory in the EU.
Updated information about the Member States’ installations generating radioactive waste and
spent fuel, national policies, programmes, concepts, plans and financing mechanisms is
summarised in the SWD(2026) 286 on the progress of the implementation of Council
Directive 2011/70/Euratom.
2. Sources of information
The European Union radioactive waste and spent fuel inventory data presented in this
document is based on the fourth national reports submitted by all Member States in 2024.
Article 14(1) of the Directive indicates that Member States can take advantage of the review
and reporting under the Joint Convention2. During previous reporting cycles, the deadlines for
submission of national reports to both legal instruments were different, resulting in a number
of Member States reporting their inventory data to the Joint Convention and to the
1 Council Directive 2011/70/Euratom of 19 July 2011 establishing a Community framework for the responsible
and safe management of spent fuel and radioactive waste; OJ L 199/48, 2.8.2011. 2 The Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste
Management.
4
Commission using different reference dates. Due to the delay caused by the COVID-19
pandemic, the deadlines for submission of the Joint Convention reports shifted in the last
cycle. For the first time, the deadlines for reporting under the Joint Convention and
submission of national reports on the implementation of the Directive to the Commission
were the same (August 2024), so all Member States have used the same radioactive waste and
spent fuel inventory data for both reporting obligations.
Twenty Member States out of 27 reported their inventory data from 2023. Three Member
States (France, Italy, and Spain) reported their inventory data as of 2022, while the remaining
four Member States have chosen to report even newer inventory data.
France, which accounts for approximately 72% of the overall EU radioactive waste volume,
reported its inventory data for 2022. However, since the submission of its report to the
Commission, France has produced and published updated inventory data for 20233. In order
to provide an overview of the latest situation and to ensure the accuracy and timeliness of the
data, the newer French inventory data (as of the end of 2023) has been used in this report.
With this change, the distribution of radioactive waste volumes by reporting year is:
• approximately 95% inventory with the reference date as of 2023;
• approximately 5% inventories with the reference dates of 2022;
• 0.003% with the reference date of 2024.
Based on this, 2023 has been chosen as the reference date for the overall EU radioactive waste
and spent fuel inventory in this document, to simplify data presentation.
For the trend analysis, inventory data from previous Commission reports is used. It should
be noted that the inventory data provided in the first and second Commission reports included
inventory information from the United Kingdom. As the United Kingdom left the European
Union on 31 January 2020, all the historical inventory data used for identification of trends
have been adjusted, i.e. the historical inventory data from 2013 and 2016 presented in this
report were adjusted to represent inventory of 27 European Union Member States.
It needs to be noted that, in preparation of this report, most of the sources of uncertainty
identified in the document SWD(2017)161 final, remained valid. In other words:
• Member States are using different radioactive waste classification schemes. For EU
inventory aggregation purposes conversion to a common reporting basis is necessary
(IAEA GSG-1 classification4; see Chapter 4 below). However, transition from one
classification scheme to another often introduces uncertainties, as the radioactive waste
classes in different national classification schemes sometimes cannot be directly matched.
In such situations, transformation is carried out on a ‘best approximation’ basis.
3 https://inventaire.andra.fr. 4 Classification of Radioactive Waste. IAEA Safety Standards No. GSG-1, 2009, Vienna.
5
• Several Member States do not have a separate VLLW class, and all VLLW radioactive
waste is included in the LLW class. This is primarily due to the planned disposal routes,
where the intention is for all short-lived radioactive waste (VLLW and LLW) to be
disposed of in the same facility. In most cases, using the same management route renders
the introduction of additional waste classes unnecessary. As a result, at the EU level,
VLLW quantities are underestimated, and LLW quantities are overestimated.
• Member States use different fundamental properties(i.e. volume, mass) to report amounts
of unconditioned waste. Conversion from mass to volume without detailed knowledge of
the radioactive waste treatment/conditioning methods used can result in significant
uncertainties5.
• Member States use different approaches to report the volume of radioactive waste; some
report volumes as the actual volume in storage, while others report estimated volumes
after conditioning for disposal. For inventory aggregation purposes, the estimated
volumes of radioactive waste to be emplaced in disposal are preferred, since this
represents the final step in management of radioactive waste. The use of actual
radioactive waste volumes in storage can lead to significant uncertainties, especially
when estimating the need for disposal capacities.
Usually, the most significant volume changes (reduction) occur as a result of liquid
radioactive waste and sludge treatment and conditioning for disposal. The same is true for
combustible and compactible radioactive waste, as well as for the treatment of metallic
waste.
In the fourth national reports, most of the Member States reported estimated disposal
volumes for unconditioned waste. This allows for the reduction of uncertainties and the
improvement of consistency and comparability of the data.
• Reporting of disused sealed radioactive sources varies from country to country. Countries
with large nuclear programmes generally integrate disused sealed radioactive sources into
other large radioactive waste streams and do not report them separately. Countries where
the disused sealed radioactive sources make up a significant part of the national inventory
report them separately from the other radioactive waste. In such cases, disused sealed
radioactive sources are reported only as number of sources.
• Knowledge of radioactive contamination of facilities subject to decommissioning plays
an important role in predicting amounts of decommissioning waste. Detailed
characterisation of a facility subject to decommissioning increases the precision in
forecasting the amount of radioactive waste, however, only when decommissioning is
well progressed will the actual categories and amounts of waste be fully known. This is
also valid for the limited knowledge of characteristics of some legacy wastes.
• Future radioactive waste inventories highly depend on various decisions introducing
additional uncertainties in the projection of future radioactive waste inventories, e.g.
o Technological decisions,such as the selection of treatment and conditioning
options, the choice between immediate or deferred decommissioning, the
decision to retrieve disposed radioactive waste, might have significant impact
5 A simple approach is to use 1 t ≡ 1 m3 equivalence.
6
on the projection of future radioactive waste inventories (e.g. volumes, waste
classes).
o Political decisions and changes in the legal/regulatory framework, such as the
development of new nuclear facilities, changes to the nuclear fuel cycle or
introduction of new radioactive waste classes.
When the development of Member States' inventories over time was assessed, the following
additional sources of uncertainties remained.
• Differences in the reference dates of Member States’ inventories. For the current
reporting period, the majority of all Member States reported inventories as of the end of
2023 and only a few Member States have chosen to report inventories with the reference
dates of 2022 or 2024.
• Change in radioactive waste status. During the reporting period, no changes were
reported in the status of previously disposed radioactive waste. However, some Member
States plan to recover previously disposed radioactive waste in the future, process it, and
re-dispose of it in existing and/or newly constructed disposal facilities. Re-disposal
activities might affect the overall radioactive waste inventory as a result of subsequent re-
treatment and re-disposal. There are already a few Member States that have taken a
decision on the remediation of disposal sites; thus, their radioactive waste is considered
as stored whilst awaiting retrieval.
3. Sources of radioactive waste and spent fuel
Radioactive waste is generated in all Member States of the European Union, although the
quantities are very small in non-nuclear power Member States compared to those Member
States operating nuclear power plants. The radioactive waste inventory in small countries
usually consists of disused sealed radioactive sources or small amounts of orphan/legacy
radioactive materials. Small volumes of radioactive waste are generated as a result of non-
power uses of radioactive materials, such as the manufacturing of radioactive materials for
use in medical and industrial applications, or research facilities like laboratories and research
reactors. Most of the Member States with research reactors have an agreement in place to
return spent fuel to the suppliers.
Most of the radioactive waste come from nuclear power plants and associated nuclear fuel
cycle activities, i.e. from conversion of uranium to fuel fabrication, to its use for electricity
generation, and the subsequent reprocessing of spent fuel. In the fourth national report, 17
Member States have declared spent fuel. Some of those Member States have chosen to
reprocess spent fuel, some Member States have chosen the once-through fuel cycle option
when spent fuel will be directly disposed in deep geological disposal. A few Member States
applied both approaches – part of their spent fuel is reprocessed and the remaining part will be
directly disposed. Currently, spent fuel is stored in specialised storage facilities until final
disposal facilities become available. In terms of activity, most of the radioactive waste is
generated during operation of nuclear facilities. However, in terms of volume, most of the
7
waste comes from decommissioning nuclear power plants and other nuclear facilities at the
end of their useful lifetime, and it is mainly low-level waste.
Few Member States manage radioactive materials from extractive industries, e.g. past
uranium mining and milling activities. In some of them, these materials are declared as
radioactive waste and reported as a part of their radioactive waste inventory, whereas in other
Member States that is not the case. Therefore, an aggregate estimate and comparison of
inventories of waste containing naturally occurring radioactive material between Member
States, or the compilation of an overall European Union inventory (including NORM waste),
are currently not possible and therefore falls outside the scope of this report.
4. Classification of radioactive waste and spent fuel
In line with Article 12(1)(c) of the Directive, Member States need to develop, as part of their
national programmes, and notify to the Commission, radioactive waste and spent fuel
inventories in accordance with an appropriate classification. Correspondingly, Member States
reported in their fourth national reports on their radioactive waste and spent fuel inventories
based on radioactive waste classifications that may differ from one Member State to another.
As in the previous report, in order to make radioactive waste and spent fuel inventories
comparable among different Member States and in order to aggregate the overall inventory on
the territory of the European Union, Member States inventories have been translated into a
common classification scheme. The IAEA GSG-1 classification system has been chosen for
that purpose in order to facilitate Member States reporting to various international
organisations (e.g. IAEA) and instruments (e.g. Joint Convention).
The categories of radioactive waste used for data aggregation are as follows.
• Very low-level waste (VLLW): waste that does not need a high level of containment and
isolation and, therefore, is suitable for disposal in near surface landfill-type facilities with
limited regulatory control.
• Low-level waste (LLW): waste that is above clearance levels, but with limited amounts
of long-lived radionuclides. Such waste requires robust isolation and containment for
periods of up to a few hundred years and is suitable for disposal in engineered near-
surface facilities. This class covers a very broad range of waste. LLW may include short-
lived radionuclides at higher levels of activity concentration, and also long-lived
radionuclides, but only at relatively low levels of activity concentration.
• Intermediate-level waste (ILW): waste that, because of its content, particularly of long-
lived radionuclides, requires a greater degree of containment and isolation than that
provided by near-surface disposal. However, ILW needs no provision, or only limited
provision, for heat dissipation during its storage and disposal. ILW may contain long-
lived radionuclides, in particular, alpha-emitting radionuclides that will not decay to a
level of activity concentration acceptable for near-surface disposal during the time for
8
which institutional controls can be relied upon. Therefore, waste in this class requires
disposal at greater depths, of the order of tens of metres to a few hundred metres.
• High-level waste (HLW): waste with levels of activity concentration high enough to
generate significant quantities of heat by the radioactive decay process or waste with
large amounts of long-lived radionuclides that need to be considered in the design of a
disposal facility for such waste. Disposal in deep, stable geological formations, usually
several hundred metres or more below the surface is the generally recognised option for
disposal of HLW.
In addition to the above-mentioned waste classes, the IAEA GSG-1 classification system lays
down the following:
• Exempt waste with concentrations of radionuclides small enough to not require
provisions for radiation protection. Such material can be cleared from regulatory control
and does not require any further consideration from a regulatory control perspective.
• Very short-lived waste containing only very short half-life radionuclides. Such waste
can be stored until the activity has fallen beneath the levels of clearance, allowing for the
cleared waste to be managed as conventional waste.
The latter two waste classes do not require future long-term management or disposal as
radioactive waste due to their short-lifetime and/or levels. This allows them to be exempted or
cleared from regulatory control. Accordingly, exempt waste and very short-lived waste are in
most cases not reported by Member States. Therefore, these waste classes have not been used
for data aggregation in the present document.
Several Member States combine VLLW and LLW, or do not have a separate VLLW class. In
the latter case, such material could be subject to clearance in accordance with the respective
national legislation. Reflecting the disposal routes, several Member States also use a
combined waste class, ‘low and intermediate-level waste’ (LILW). Where a system other than
the IAEA GSG-1 classification system is used for reporting by Member States, a conversion
provided by the Member States is applied in this report in order to achieve the transformation
from the national to the IAEA classification system.
Spent fuel (SF) is also considered in its entirety, whether it might be intended for
reprocessing or awaiting decision for future long-term management (reprocessing or
disposal).
5. Current radioactive waste and spent fuel inventory in the European Union
This Section is dedicated to the presentation and analysis of the radioactive waste and spent
fuel inventory present in the Community’s territory and its future prospects as required by
Article 14(2)(b) of the Directive. The information used to compile this Section was primarily
collected from the fourth national reports. The details on the reported national inventories are
given in Annex I of this document. The first Commission report contained information on the
9
radioactive waste disposed of at sea (Table I.8 of the Staff Working Document
SWD(2017)161 final). As such disposal practices were prohibited by the London Convention
that entered into force in 1975, and no new information has emerged since publication of the
first Commission report, information on radioactive waste disposed of at sea is excluded from
this document.
The Section is composed of two parts – the first part deals with the radioactive waste
inventory and the second part is dedicated to the spent fuel inventory.
Overall, inventory data reported in the fourth national reports are generally consistent with the
data provided in national programmes and third national reports. In most of the cases, national
reports provided sufficient information to explain non-typical changes in the inventories (e.g.
successful volume reduction programmes resulting in reduction of waste amounts without
presence of disposal activities). However, the number of sources of uncertainties previously
listed in Section 2 of this document still remains an obstacle for most complete and
comprehensive reporting of national and EU inventory.
EU radioactive waste inventory
The estimated total inventory of radioactive waste on European Union territory at the end of
2023 was 2 593 000 m3. Approximately 65% of this waste has already been disposed of
(1 692 000 m3), while 35% (901 000 m3) is still in storage and will have to be managed in the
future. Compared to the 2019 radioactive waste inventory, reported in the last Commission
report, there has been a 10% increase in total radioactive waste volumes. Between 2016 and
2019 there was a 5% total radioactive waste inventory increase. The larger increase in
radioactive waste volumes can be attributed to a longer period between inventory reports, as
well as progress in decommissioning nuclear power plants, which has resulted in larger
volumes of VLLW and LLW.
Table 1 and Figure 1 summarises the overall amounts of radioactive waste in the European
Union with comparison to previous reporting (i.e. development since 2019).
10
Table 1: Volumes of radioactive waste in the European Union in 2019 and 2023.
Waste class
EU RAW Amounts (m3, rounded to thousands)6
Stored Disposed Total
2019 2023 2019 2023 2019 2023
VLLW 233 000 303 000 462 000 558 000 695 000 861 000
LLW 353 000 385 000 1 068 000 1 113 000 1 421 000 1 497 000
ILW 191 000 208 000 22 000 21 000 213 000 229 000
HLW 4 800 5 200 0 0 4 800 5 200
Total (m3) 782 000 901 000 1 552 000 1 692 000 2 334 000 2 593 000
Figure 1: Distribution of the RAW in the EU between stored and disposed waste by waste
class at the end of 2019 and 2023.
Figure 2 and Figure 3 provides information on the distribution of radioactive waste in the
European Union by waste class and by management status. As it can be seen from those
figures, the distribution of radioactive waste by class has not changed significantly compared
6 Except for HLW, which is rounded to hundreds.
11
to 2019. As in previous reporting, VLLW and LLW together make up approximately 90% of
the overall waste amount. The share of ILW has slightly decreased and is now estimated at
8.8% (see Figure 3). HLW makes by far the smallest fraction of the overall waste volume,
accounting for less than 0.2% (all HLW is kept in storage).
Figure 2: Distribution of the total RAW in the EU between stored and disposed waste at the
end of 2019 and 2023.
Figure 3: Distribution of the total RAW in the EU by waste category at the end of 2019 and
2023.
Even though LLW dominates radioactive waste inventory, two specific points should be taken
into consideration.
• The majority of Member States without nuclear power programme and some nuclear
Member States do not have separate VLLW class as defined in the IAEA GSG-1 waste
classification scheme. In such cases all the VLLW is reported as part of LLW waste class,
meaning that for some Member States the actual fraction of disposed LLW volumes
could be significantly lower.
12
• Some Member States do not register (partially or completely) VLLW amounts in their
national inventory.
Both above-mentioned issues lead to a situation where VLLW amounts are underestimated
and LLW overestimated.
The total quantity of the disposed radioactive waste as of end-2023 equals 1 692 000 m3.
This is approximately 65% of total RAW and consists mainly of LLW, i.e. 66% of the
disposed radioactive waste is LLW. At the end of 2023, 65% of the total VLLW volume was
reported as disposed of and the amount of VLLW disposed has steadily increased. At the
same time, 74% of LLW is reported as disposed. Few Member States have reported small
amounts of ILW disposed of (1.4% of the total disposed waste). Some Member States are
considering whether to retrieve ILW and re-dispose of it in new disposal facilities.
The total reported volume of stored radioactive waste in 2023 was 901 000 m3. LLW makes
up most of this amount (42.7%), while VLLW and ILW make up 33.7% and 23.1%,
respectively. The HLW fraction in the overall radioactive waste in storage is 0.6% and it
remains unchanged since the previous report.
Radioactive waste inventory - trends in the EU
The development of the total amount of radioactive waste (Table 2), radioactive waste in
storage (Table 3) and radioactive waste which has been disposed of (Table 4) is based on the
data from the previous Commission reports published in 2017 (inventory data from 2013),
2019 (inventory data 2016), 2024 (inventory data 2019), and on the current data from the
fourth national reports (inventory data 2023).
Table 2: Development of total radioactive waste inventory since 2013.
Waste class Total amount (m3, rounded to thousands)7
2013* 2016* 2019 2023
VLLW 515 000 601 000 696 000 861 000
LLW 1 345 000 1 420 000 1 420 000 1 497 000
ILW 185 000 190 000 213 000 229 000
HLW 4 300 4 500 4 800 5 200
Total (m3) 2 049 000 2 216 000 2 334 000 2 593 000
* Inventory from 2013 and 2016 refers to 27 Member States without the United Kingdom.
7 Except for HLW, which is rounded to hundreds.
13
Figure 4 presents the development of radioactive waste inventory for the period 2013-2023.
The amounts of radioactive waste steadily increase for each waste class, with the LLW
remaining dominant waste class in terms of total volume and disposal rate.
Figure 4: Development of total radioactive waste volumes since the end of 2013
(with the percentage of waste disposed of indicated).
Development of the stored radioactive waste volumes (per waste category) is presented in
Table 3.
Table 3: Development of stored radioactive waste in the 2013-2023 period.
Waste class Stored amount (m3, rounded to thousands)8
2013* 2016* 2019 2023
VLLW 236 000 233 000 233 000 303 000
LLW 358 000 381 000 353 000 385 000
ILW 173 000 178 000 191 000 208 000
HLW 4 300 4 500 4 800 5 200
Total (m3) 771 000 797 000 782 000 901 000
* Inventory from 2013 and 2016 refers to 27 Member States without the United Kingdom.
8 Except for HLW, which is rounded to hundreds.
14
There are currently no operational deep geological disposal facilities for ILW and HLW.
Consequently, the amounts of stored ILW and HLW are steadily increasing over time. The
amounts of VLLW and LLW in storage are affected by differences in generation, treatment
and disposal rates. During different time periods, their respective amounts in storage may
therefore increase or decrease. The volume of stored VLLW and LLW is fairly stable and has
not changed significantly since 2013. This shows that the disposal rate of VLLW and LLW is
aligned with the generation rate of the radioactive waste.
Table 4 shows the development of radioactive waste disposal over time. It shows a steady
increase of disposed VLLW and LLW since 2013, confirming that the disposal system is
functioning properly.
Table 4: Development of radioactive waste disposals in the 2013-2023 period.
Waste class Disposed amount (m3, rounded to thousands)9
2013* 2016* 2019 2023
VLLW 279 000 369 000 462 000 558 000
LLW 987 000 1 039 000 1 068 000 1 113 000
ILW 12 000 12 000 22 000 21 000
HLW 0 0 0 0
Total (m3) 1 279 000 1 420 000 1 552 000 1 692 000
* Inventory from 2013 and 2016 refers to 27 Member States without the United Kingdom.
Table 4 also shows that some Member States are disposing of ILW. However, this is not yet
widespread practice. These disposals, in accordance with the IAEA classification, consist
mainly of highly active disused radioactive sealed sources containing short-lived
radionuclides. Approximately 91% of ILW is still kept in storage and pending proper disposal
facilities.
Overall, situation remains broadly the same compared to the situation described in the
previous Commission reports. Approximately 26% of the LLW amount generated is kept in
storage. There has been no systematic increase in the amounts in storage between 2013 and
2023 and the overall LLW amount of waste generated and disposed is generally in
equilibrium. LLW disposal is dominated by Member States with large LLW inventories
(primarily France), whereas a number of Member States with smaller inventories do not yet
dispose of their LLW.For ILW the situation is very different. In 2023, approximately 9% of
the total ILW volume was reported as disposed. There is a steady increase of ILW in storage.
9 Except for HLW, which is rounded to hundreds.
15
For HLW and spent fuel declared as radioactive waste, the first disposal facility is expected to
start operation soon in Finland, followed by similar facilities in Sweden (in around 2030) and
France (in around 2035).Therefore, the amounts of HLW and spent fuel in storage should be
expected to increase steadily in line with their generation.
Currently, 12 Member States10 have radioactive waste disposal facilities either in operation or
closed (nuclear power programme countries: Czechia, Finland, France, Germany, Hungary,
Lithuania, Romania, Slovakia, Spain, Sweden; non-nuclear programme countries: Latvia and
Poland). Based on the information from the national programmes and reports, several
Member States are in the process of siting or building the disposal facilities and it is expected
that more disposal facilities will become operational in the coming years.
This report presents the status of RAW inventory for all Member States. However, there are
significant differences in the amounts of managed radioactive waste between Member States
with and without nuclear power programmes. Because of this difference in scale, this
document presents the inventories for Member States with and without nuclear power
programme separately.
There are fifteen11,12 European Union Member States that operate or have operated nuclear
power plants. At aggregate level, these Member States have 100 times the amount of RAW
stored on their territory as compared with the 12 Member States without nuclear power
programme. This difference varies between RAW classes and e.g. for VLLW it is almost
5 400 times and for LLW and ILW it is 57 and 85 times, respectively. The large difference in
VLLW amounts can be clarified by the fact that the majority of the Member States without
nuclear power programmes do not use the VLLW classification and classify all their short-
lived radioactive waste as LLW. It can be clearly seen that Member States without nuclear
power programmes are contributing very little to the overall European Union radioactive
waste inventory in storage (see Figure 5).
10 Bulgaria and Lithuania categorised and using these past disposal (RADON type) facilities as storage facilities.
See Table 5 of the Staff Working Document (2024)123 on Progress of Implementation of Council
Directive 2011/70/Euratom. 11 Krško NPP is co-owned by Slovenia and Croatia. The radioactive waste and spent fuel inventory at Krško
NPP is equally owned by Slovenia and Croatia. 12 Belgium, Bulgaria, Czechia, Finland, France, Germany, Hungary, Italy, Lithuania, the Netherlands, Romania,
Slovakia, Slovenia, Spain, Sweden.
16
Figure 5: Volumes of stored radioactive waste by class in Member States with and without
nuclear power programmes, end of 2019 and 2023.
Altogether, Member States with nuclear power programmes account for 99% of the
radioactive waste inventory in the European Union. The percentage share of the total RAW in
2023 between Member States with nuclear power programme is presented in Figure 6.
Total
Total
Total
Total
With nuclear power programme
Without nuclear power programme
With nuclear power programme
Without nuclear power programme
LLW LLW ILW LW
17
Figure 6: Distribution of total volumes of radioactive waste (2 580 000 m3) in Member States
with nuclear power programmes, end of 202313.
* Hungary, The Netherlands, Finland, Romania, and Slovenia account for 2% together
Having the largest fleet of nuclear power plants, France clearly dominates with the largest
volumes of radioactive waste (72% of the total radioactive waste in Member States with
nuclear power programme). The Member State with the next-highest share is Germany, with
9.5%. The total volume of radioactive waste in those Member States is shown individually in
Figure 7 (with indicated stored and disposed amounts in 2019 and 2023).
13 Member States’ (MS) abbreviations in this report are as follows Austria (AT), Belgium (BE), Bulgaria (BG),
Croatia (HR), Cyprus (CY), Czechia (CZ), Denmark (DK), Estonia (EE), Finland (FI), France (FR),
Germany (DE), Greece (EL), Hungary (HU), Ireland (IE), Italy (IT), Latvia (LV), Lithuania (LT),
Luxembourg (LU), Malta (MT), The Netherlands (NL), Poland (PL), Portugal (PT), Romania (RO),
Slovakia (SK), Slovenia (SI), Spain (ES) and Sweden (SE).
18
Figure 7: Volumes of RAW waste in the 15 Member States with nuclear power programmes,
end of 2019 and 2023.
Twelve Member States have no nuclear programme14, although six of them are operating or
have operated research, training or demonstration nuclear reactors. The distribution of the
total volume of radioactive waste among the Member States without nuclear power
programme is shown in Figure 8 and Figure 9 with information on stored and disposed
amounts for 2019 and 2023.
14 Croatia is co-owner of the Krško nuclear power plant, but in the context of this report it is considered as not
having a nuclear power programme.
D E
S E
E S
L T
S K
B G
IT B E
C
U
I
N L
S I
Stored Disposed
19
Figure 8: Distribution of total volumes of RAW in Member States without nuclear power
programmes, end of 2023 (HR, LU, CY, IE and MT have together 0.1%).
Figure 9: Volume of RAW waste in Member States without nuclear power programmes, end of
2019 and 2023.
P L
A T
D K
E E
L
P T
E L
M T
L U
C
IE
Stored Disposed
20
Member States with nuclear power programmes are primary contributors to the overall
radioactive waste inventory of the European Union. The radioactive waste amounts are in line
with the size of their respective nuclear programmes. The amounts of stored radioactive waste
in Member States with nuclear power programmes are shown in Figure 10 for 2019 and 2023
with information on amounts of all RAW waste classes.
Figure 10: Volumes of stored RAW waste by class in Member States with nuclear power
programmes, end of 2019 and 2023.
The amounts of stored radioactive waste for Member States without nuclear power
programmes are shown in Figure 11 for 2019 and 2023 with information on the amounts of all
RAW waste classes.
D E
L T
B G
S E
IT B E
S K
E S
N L
U
I
S I
C
LLW LLW ILW LW
21
Figure 11: Volumes of stored RAW by class in MSs without nuclear power programmes, end of
2019 and 2023.
The distribution of the disposed radioactive waste is presented in Figure 12 for all 27 Member
States regardless of whether they have nuclear power programme or not, with information on
the amounts of all RAW waste classes for 2019 and 2023 for comparison. No HLW waste
was disposed of in any Member State until this reporting period.
D K
A T
E E
P L
P T
E L
L
L U
C
IE M T
LLW LLW ILW
22
Figure 12: Volumes of radioactive waste disposed of in the European Union,
end of 2019 and 2023.
Spent fuel inventory
Based on the Member State strategy, spent fuel (from power and non-power reactors) is
stored pending either disposal or reprocessing. During reprocessing, uranium and plutonium
are recovered, with additional generation of radioactive waste (mainly HLW and ILW). As
there are no operational disposal facilities for spent fuel, it is currently stored until disposal
facilities become available.
At the end of 2023, approximately 58 600 tHM of spent fuel was stored in European Union
territory (an increase of about 5% since 2019 and 17% since 2013) and slightly more than
1000 tHM of spent fuel (about 1.7%) was sent for reprocessing outside the European Union
and is currently there in storage with the expected returns of resulting radioactive waste from
reprocessing. In total this results in approximately 59 600 tHM of spent fuel.
D E
S E
E S
S K
C
I
L T
U
P L
L
LLW LLW ILW
23
Figure 13: Spent fuel in storage at the end of 2019 and 2023.
The most recent reported amounts of spent fuel stored at each Member States are shown in
Figure 13, together with values from 2019 for comparison. Some Member States have smaller
inventories of spent fuel (or none) in storage than that generated by the nuclear power plants
because part of it or all of it has been reprocessed. On the other end, countries with neither
past nor current reprocessing have comparably high spent fuel inventories. An increase in the
spent fuel mass is visible in all Member States. The percentage share of spent fuel between
Member States is presented in Figure 14.
rance
Germany
Sweden
Spain
Belgium
omania
inland
Lithuania
C echia
Bulgaria
Slovakia
ungary
Slovenia
Italy
Netherlands
Denmark
Poland
24
Figure 14: Member States’ contribution to the overall spent fuel inventory in the European
Union at the end of 2023.
France accounts for nearly 24% of all spent fuel in the EU, followed by Germany at
approximately 17%. The third and fourth countries by volume are Sweden (13%) and Spain
(10%). There is a gradual but smaller difference among the rest of Member States. Figure 15
presents the development of the total spent fuel mass for all Member States since 2013.
Given that no disposal route is currently available for spent fuel (the first disposal facility is
expected to become operational soon) and that not all Member States are reprocessing their
spent fuel, there is a continual increase in the amount of spent fuel in storage (see Figure 15).
Figure 15: Development of spent fuel in storage owned by the Member States from 2013 up to
2023.
rance .
Germany .
Sweden .
Spain .
Belgium .
omania .
inland .
Lithuania .
C echia .
Bulgaria .
Slovakia .
ungary .
Slovenia .
Italy .
Netherlands .
Denmark .
Poland .
25
6. Projections of radioactive waste and spent fuel
The Staff Working Document on the EU Inventory (SWD(2017)161) reported that projections
of radioactive waste inventories in Member States differed in the level of detail and time
frames provided. Several Member States did not provide any or sufficiently detailed estimates
of their future inventory of spent fuel and/or radioactive waste, particularly for new builds and
decommissioning. Therefore, at that time, it was not possible for the Commission to forecast
future total EU inventories.
Starting from the second national reports, Member States significantly improved their
reporting of future projections, allowing the Commission to prepare an EU radioactive waste
and spent fuel forecast for 2030.
It must be stressed that all uncertainties previously mentioned are significantly larger for
future predictions, and the indicated future EU radioactive waste volumes are indicative only.
Due to limitations in the reported inventory data, only an estimation of short-term radioactive
waste and spent fuel projections for 2030 was possible. The majority of Member States
provided estimates of their future inventories for 2050. However, due to the unavailability of
2050 inventory forecast data from some large Member States, it is still not possible to produce
an overall EU long-term inventory forecast.
The Commission’s estimate of the EU’s radioactive waste and spent fuel inventory for is
presented in Table 5. Data reported by individual Member States are provided in Annex I of
this document.
Decommissioning of nuclear power plants is becoming an increasingly important activity for
the European nuclear industry due to the ageing of the reactor fleet. This has a significant
impact on the amounts of radioactive waste generated, particularly VLLW and low-level
waste, and should therefore be considered when planning disposal and storage facilities. As
shown in Figure 16 and 17, total VLLW volumes are expected to increase by one-third by
2030 compared to current levels, and a significant increase in LLW is also anticipated. The
current VLLW volumes represent 73.5% of the projected VLLW amounts in 2030 (a 36%
increase from current levels). For LLW, current amounts account for 84% of the projected
LLW amounts in 2030 (a 19% increase from current levels). The primary contributors to this
growth are the Member States with the largest nuclear programmes.
For intermediate-level waste and high-level waste, safe and responsible management remains
challenging due to the limited availability of long-term storage capacity and the need to
develop sustainable disposal solutions. It is projected that ILW volumes will increase by
approximately 5% by 2030, with the majority of this growth stemming from
decommissioning activities. The HLW increase of about 48% will primarily result from the
reprocessing of spent fuel, particularly in France.
26
Table 5: Estimated future amounts of RAW in the EU MSs for 2030.
Future RAW and SF amount estimates (m3, rounded to
thousands)15
VLLW LLW ILW HLW SF
2023 861 000 1 491 000 236 000 5 200 59 600
2030 1 171 000 1 778 000 247 000 7 700 66 900
Figure 16: Estimation of radioactive waste generation by 2030 compared to current
inventory.
15 Except for HLW, which is rounded to hundreds.
27
Figure 17: Volumes of total radioactive waste in the European Union, end of 2023 and
forecast for 2030.
The spent fuel inventory is expected to increase from 59 600 tHM to 66 900 tHM by 2030,
representing a 12% rise. It should be noted that the majority of Member States have not yet
reported inventories from new builds. However, as some Member States proceed with spent
fuel reprocessing, this projected increase does not fully represent the actual amount of spent
fuel discharged from reactors. Part of the spent fuel is sent for reprocessing outside the
European Union, and it is expected that approximately 1100 m3 of radioactive waste from
spent fuel reprocessing will be returned to the EU by 2030.
LLW LLW ILW LW
28
Annex I: Radioactive waste and spent fuel inventory data
‘-’ in the tables below means no data were received from the Member State or no such
practice exists
‘ ’ in the table means that data with value ‘ ’ was received from the Member State
Table I.1. Overall European Union radioactive waste inventory and future prospects as
at the end of 2023
Total RAW 2023 2030 2050 Other date
MS Category Volume,
m3
Decom.
Share, m3 Volume, m3
Decom.
Share, m3 Volume, m3
Decom.
Share, m3
Volume, m3
[Date, year] Decom.
Share, m3
Austria
VLLW - - - - - - - -
LLW 2 523 1 030 3 130 1 750 3 510 1 930
3 500
[2045] 1 930
[2045]
ILW 52 30 67 50 100 50 100 [2045] 50 [2045]
HLW - - - - - - - -
Belgium
VLLW - - - - - - - -
LLW 16 880 - - - - -
57 600
[2130] -
ILW 9 351 - - - - -
10 100
[2130] -
HLW 70 - - - - - 70 [2130] -
Bulgaria
VLLW 10 364 - 42 000 - - - - -
LLW 20 767 - 90 200 - - - - -
ILW 10 - 10 - - - - -
HLW 0 - 1 100 - - - - -
Croatia
VLLW - - - - - - - -
LLW 7.53 0 - - - - - -
ILW 3.81 0 - - - - - -
HLW 0 0 - - - - - -
Cyprus
VLLW - - - - - - - -
LLW - - <1 - <1 - - -
ILW - - - - - - - -
HLW - - - - - - - -
Czechia
VLLW - - - - - - - -
LLW 15 966 - - - - - - -
ILW 10 332 - - - - - - -
HLW - - - - - - -
Denmark
VLLW - - - - - - - -
LLW 5 709
- - - - - - -
ILW - - - - - - -
HLW - - - - - - - -
Estonia VLLW - - - - - - - -
LLW 1 077 - - - - - - -
29
Total RAW 2023 2030 2050 Other date
MS Category Volume,
m3
Decom.
Share, m3 Volume, m3
Decom.
Share, m3 Volume, m3
Decom.
Share, m3
Volume, m3
[Date, year] Decom.
Share, m3
ILW 21 - - - - - - -
HLW - - - - - - - -
Finland
VLLW 869 0 - - - - - -
LLW 12 479.3 38 - - - - - -
ILW 46.7 22 - - - - - -
HLW 0 0 - - - - - -
France
VLLW 702 000 - 926 000 - - - - -
LLW 1 001 100 - 1 100 000 - - - - -
ILW 156 800 - 157 500 - - - - -
HLW 4 550 - 5 630 - - - - -
Germany
VLLW - - - - - - - -
LLW 219 592* - - - - - - -
ILW 24 399* - - - - - - -
HLW 507 - - - - - - -
Greece
VLLW 27.84 - - - - - - -
LLW 299.53** - - - - - - -
ILW 0.93 - - - - - - -
HLW - - - - - - - -
Hungary
VLLW 3 354 - 4 023 - 4 499 - - -
LLW 8 386 - 10 057 - 11 247 - - -
ILW 5 512 - 6 566 - 7 455 - - -
HLW - - - - - - - -
Ireland
VLLW - - - - - - - -
LLW - - - - - - - -
ILW - - - - - - - -
HLW - - - - - - - -
Italy
VLLW 14 642 2 674 34 395 12 034 48 787 26 427
48 787
[2065] 26 427
[2065]
LLW 8 781 2 436 22 973 10 960 34 432 22 419
34 432
[2065] 22 419
[2065]
ILW 5 261 675 9 911 3 039 13 748 6 876
13 748
[2065] 6 876
[2065]
HLW 0 - 369 - 369 - 369 [2065] -
Latvia
VLLW - - - - - - - -
LLW 839 - 2 017 - 2 032 - - -
ILW 54 - 68 - 71 - - -
HLW 0 - - - - - - -
Lithuania
VLLW 27 987 - 33 200 - 53 500 - - -
LLW 39 546 - 30 530 - 114 417 - - -
ILW 1 287 - 2 562 - 7 500 - - -
HLW - - - - - - - -
Luxem-
bourg
VLLW - - - - - - - -
LLW 0.1 - - - 0.1 - - -
ILW - - - - - - - -
HLW - - - - - - - -
30
Total RAW 2023 2030 2050 Other date
MS Category Volume,
m3
Decom.
Share, m3 Volume, m3
Decom.
Share, m3 Volume, m3
Decom.
Share, m3
Volume, m3
[Date, year] Decom.
Share, m3
Malta
VLLW - - - - - - - -
LLW - - - - - - - -
ILW - - - - - - - -
HLW - - - - - - - -
The
Netherlan
ds
VLLW - *** - - - - - - -
LLW 12 876
- 14 548
- 20 615
- 31 461
[2130]
-
ILW - - - -
HLW 100.2 - 173 - 201 - 227 [2130] -
Poland
VLLW - - - - - - - -
LLW 2819.41 - - - - - - -
ILW 1 385 - - - - - - -
HLW - - - - - - - -
Portugal
VLLW 5.2 - - - - - - -
LLW 271.8 - - - - - - -
ILW 15.9 - - - - - - -
HLW - - - - - - - -
Romania
VLLW 270 - 200 - 100 - - -
LLW 3 630.1 - 3 733.7 - 7 395.92 - - -
ILW 105.48 - 228.6 - 509.98 - - -
HLW 0.13 - 0.02 - 0.02 - - -
Slovakia
VLLW 31 813.8 - - - - - - -
LLW 28 119 - - - - - - -
ILW 45.57 - - - - - - -
HLW - - - - - - - -
Slovenia
VLLW - - - - - - - -
LLW 2 382
- 2 972
- 3 467
- 3 342
[2040]
-
ILW - - - -
HLW - - - - - - - -
Spain
VLLW 33 759 21 682 51 300 30 000 121 300 94 100
125 000
[2100] 98 700
[2100]
LLW 41 142 3 997 56 000 10 000 93 900 46 700
94 200
[2100] 46 700
[2100]
ILW 201 185 300 200 2 700 700
3 900
[2100] 700 [2100]
HLW 13 0 13 0 13 0 13 [2100] 0 [2100]
Sweden
VLLW 36 050 - 55 000 - 64 000 - - -
LLW 53 300 - 90 000 - 145 000 - - -
ILW 12 600 - 15 000 - 15 000 - - -
HLW 0 - - - - - - -
* Indicated LLW and ILW amounts include 19 503t of unconditioned non-heat generating waste. For
aggregation purposes Commission Services assumed 1t = 1m3 (numbers not verified by Germany)
** Including uncharacterised radioactive waste at NCS ‘D’ and other facilities.
*** Information on VLLW inventory as well as origin of waste amounts is not registered in the Netherlands.
31
T b I. . Sp n r d n b r S ’ rri r
SF in storage on MS territory, tHM
Country 2023 2030 2050 Other date
(Mass/date)
Austria - - - -
Belgium 4 234.4 - - 4 500 [2130]
Bulgaria* 996 1 286 - -
Croatia** - - - -
Cyprus - - - -
Czechia 2 321 - - -
Denmark 0.238 - - -
Estonia - - - -
Finland 2 488 3 154 4 169 -
France 14 328 15 125 - -
Germany 10 045 10 049 10 049 -
Greece - - - -
Hungary 1 563 2 144 3 351 -
Ireland - - - -
Italy 15.819 2.95 2.95 2.95 [2040]
Latvia - - - -
Lithuania 2 397.528 2 397.528 2 397.528 -
Luxembourg - - - -
Malta - - - -
The Netherlands*** 11.4 m3 - - -
Poland 0.341 - - -
Portugal - - - -
Romania 4 138 5 795 14 383 -
Slovakia 1 813 - - -
Slovenia** 574 685 913 842 [2040]
Spain 5 924 7 467 - -
Sweden 7 726 9 500 4 000 -
* Excluding spent fuel shipped to the Russian Federation
** Spent fuel reported by Slovenia to be shared equally by Croatia and Slovenia.
*** Spent fuel stored in COVRA is accounted in m3.
32
T b I. . C ndi i n d r di c i w r d n b r S ’ rri r
Stored conditioned RAW (Estimated volume for disposal, m3)
Country RAW 2023 2030 2050 Volume [Date]
Austria
VLLW - - - -
LLW 2 523 3 130 3 510 3 500 [2045]
ILW 52 67 100 100 [2045]
HLW - - - -
Belgium
VLLW - - - -
LLW 16 880 - - 57 600 [2130]
ILW 9 351 - - 10 100 [2130]
HLW 70 - - 70 [2130]
Bulgaria
VLLW 5 772 42 000 - -
LLW 13 786 90 200 - -
ILW 0 10 - -
HLW 0 1 100 - -
Croatia
VLLW - - - -
LLW 7.53 - - -
ILW 3.81 - - -
HLW - - - -
Cyprus
VLLW - - - -
LLW - - - -
ILW - - - -
HLW - - - -
Czechia
VLLW - - - -
LLW - - - -
ILW - - - -
HLW - - - -
Denmark
VLLW - - - -
LLW - - - -
ILW - - - -
HLW - - - -
Estonia
VLLW - - - -
LLW 1 077 - - -
ILW 21 - - -
HLW - - - -
Finland
VLLW 869 - - -
LLW 1 285.95 - - -
ILW 1.05 - - -
HLW - - - -
France
VLLW 233 000 - - -
LLW 95 100 - - -
ILW 156 800 - - -
33
Stored conditioned RAW (Estimated volume for disposal, m3)
Country RAW 2023 2030 2050 Volume [Date]
HLW 4 550 - - -
Germany
VLLW - - - -
LLW 120 861 - - -
ILW 13 429 - - -
HLW - - - -
Greece
VLLW - - - -
LLW - - - -
ILW - - - -
HLW - - - -
Hungary
VLLW - 118 131 -
LLW - 295 328 -
ILW - 182 222 -
HLW - - - -
Ireland
VLLW - - - -
LLW - - - -
ILW - - - -
HLW - - - -
Italy
VLLW 4 614.9 - - -
LLW 4 070.6 - - -
ILW 529.6 - - -
HLW - - - -
Latvia
VLLW - - - -
LLW 56 78 93 -
ILW 19 14 17 -
HLW - - - -
Lithuania
VLLW 20 335 12 200 0 -
LLW 39 546 30 530 0 -
ILW 1 287 2 562 7 500 -
HLW - - -
Luxembourg
VLLW - - - -
LLW - - - -
ILW - - - -
HLW - - - -
Malta
VLLW - - - -
LLW - - - -
ILW - - - -
HLW - - - -
The
Netherlands
VLLW - - - -
LLW 12 876 14 548 20 615 31 461 [2130]
ILW
HLW 100.2 173 201 227 [2130]
34
Stored conditioned RAW (Estimated volume for disposal, m3)
Country RAW 2023 2030 2050 Volume [Date]
Poland
VLLW - - - -
LLW 50.7 - - -
ILW 807.9 - - -
HLW - - - -
Portugal
VLLW 5.2 - - -
LLW 271.8 - - -
ILW 15.9 - - -
HLW - - - -
Romania
VLLW - - - -
LLW 13 - - -
ILW 0.44 0.44 0.66 -
HLW - - - -
Slovakia
VLLW - - - -
LLW - - - -
ILW - - - -
HLW - - - -
Slovenia
VLLW - - - -
LLW 2 419.2
- - -
ILW - - -
HLW - - - -
Spain
VLLW 8 089 6 300 11 300 0 [2100]
LLW 4 985 10 000 1 200 0 [2100]
ILW 201 300 2 700 0 [2100]
HLW 0 13 13 0 [2100]
Sweden
VLLW 5 500 3 000 1 000 -
LLW 12 700 30 000 5 000 -
ILW 12 600 15 000 10 000 -
HLW - - - -
35
Table I.4. Unconditioned radioactive waste stored on b r S ’ rri r
Stored unconditioned RAW (volume, m3 / or mass, t)16
Country Volume
RAW 2023
Storage
Estimated disposal volume
2030 2050 Volume
[Date]
Austria
VLLW - - - - -
LLW - - - - -
ILW - - - - -
HLW - - - - -
Belgium
VLLW - - - - -
LLW - - - - -
ILW - - - - -
HLW - - - - -
Bulgaria
VLLW 4 592 4 592 - - -
LLW 6 981 6 981 - - -
ILW 3 10 - - -
HLW 0 - - - -
Croatia
VLLW - - - - -
LLW - - - - -
ILW - - - - -
HLW - - - - -
Cyprus
VLLW - - - - -
LLW - - - - -
ILW - - - - -
HLW - - - - -
Czechia
VLLW - - - - -
LLW 1 366.4 m3
339 t
- - - -
ILW - - - -
HLW - - - - -
Denmark
VLLW - - - - -
LLW 5 709
- - - -
ILW - - - -
HLW - - - - -
Estonia
VLLW - - - - -
LLW - - - - -
ILW - - - - -
HLW - - - - -
Finland
VLLW - - - - -
LLW - 38 - - -
ILW 1 275 3 558.8 - - -
HLW - - - - -
16 Unless otherwise indicated, amounts without units are volumes in m3.
36
Stored unconditioned RAW (volume, m3 / or mass, t)16
Country Volume
RAW 2023
Storage
Estimated disposal volume
2030 2050 Volume
[Date]
France
VLLW - - - - -
LLW - - - - -
ILW - - - - -
HLW - - - - -
Germany
VLLW - - - - -
LLW 22 914 t - - - -
ILW 2 546 t - - - -
HLW - - - - -
Greece
VLLW 27.84 - - - -
LLW 299.53* - - - -
ILW 0.93 - - - -
HLW - - - - -
Hungary
VLLW 2 012 2 107 1 574 0 -
LLW 5 031 5 268 3 936 0 -
ILW 3 360 3 641 2 509 182 -
HLW - - - - -
Ireland
VLLW - - - - -
LLW - - - - -
ILW - - - - -
HLW - - - - -
Italy
VLLW 13 424.8 10 027.3 - - -
LLW 5 160 4 710.1 - - -
ILW 2 990 4 731.7 - - -
HLW - - - - -
Latvia
VLLW - - - - -
LLW - - - - -
ILW - - - - -
HLW - - - - -
Lithuania
VLLW - - - - -
LLW - - - - -
ILW - - - - -
HLW - - - - -
Luxembourg
VLLW - - - - -
LLW - - - - -
ILW - - - - -
HLW - - - - -
Malta
VLLW - - - - -
LLW - - - - -
ILW - - - - -
37
Stored unconditioned RAW (volume, m3 / or mass, t)16
Country Volume
RAW 2023
Storage
Estimated disposal volume
2030 2050 Volume
[Date]
HLW - - - - -
The
Netherlands
VLLW - - - - -
LLW - - - - -
ILW - - - - -
HLW - - - - -
Poland
VLLW - - - - -
LLW - - - - -
ILW - - - - -
HLW - - - - -
Portugal
VLLW - - - - -
LLW - - - - -
ILW - - - - -
HLW - - - - -
Romania
VLLW 270 m3 - - - -
LLW 1 374 m3 - 2 846.7 7 320.92 -
ILW 107.38 m3 - 226.6 506.98 -
HLW 0.13 m3 - - - -
Slovakia
VLLW 9 445.4 t 7 871 - - -
LLW
582.2 m3
5 291.4 t
7 256.6 - - -
ILW
0.85 m3
344.460 t
45.57 - - -
HLW - - - - -
Slovenia
VLLW - - - - -
LLW 31 - - - -
ILW 20.7 - - - -
HLW - - - - -
Spain
VLLW - - - - -
LLW - - - - -
ILW - - - - -
HLW - - - - -
Sweden
VLLW - - - - -
LLW - - - - -
ILW - - - - -
HLW - - - - -
* Including uncharacterised radioactive waste at NCS ‘D’ and other
facilities.
38
T b I. . Di p d r di c i w n b r S ’ rri r
Disposed RAW (Volume as disposed, m3)
Country RAW 2023 2030 2050 Other date
Austria
VLLW - - - -
LLW - - - -
ILW - - - -
HLW - - - -
Belgium
VLLW - - - -
LLW - - - -
ILW - - - -
HLW - - - -
Bulgaria
VLLW - - - -
LLW - - - -
ILW - - - -
HLW - - - -
Croatia
VLLW - - - -
LLW - - - -
ILW - - - -
HLW - - - -
Cyprus
VLLW - - - -
LLW - - - -
ILW - - - -
HLW - - - -
Czechia
VLLW - - - -
LLW 14 260.8 - - -
ILW 10 332 - - -
HLW - - - -
Denmark
VLLW - - - -
LLW - - - -
ILW - - - -
HLW - - - -
Estonia
VLLW - - - -
LLW - - - -
ILW - - - -
HLW - - - -
Finland
VLLW 0 1 400 4 600 -
LLW 9 893 16 857 19 648 -
ILW 33 82 91 -
HLW 0 - - -
France VLLW 469 000 - - -
39
Disposed RAW (Volume as disposed, m3)
Country RAW 2023 2030 2050 Other date
LLW 906 000 - - -
ILW - - - -
HLW - - - -
Germany
VLLW - - - -
LLW 76 311 - - -
ILW 8 479 - - -
HLW - - - -
Greece
VLLW - - - -
LLW - - - -
ILW - - - -
HLW - - - -
Hungary
VLLW 1 247 2 330 4 368 -
LLW 3 119 5 826 10 920 -
ILW 1 871 3 495 6 552 -
HLW - - - -
Ireland
VLLW - - - -
LLW - - - -
ILW - - - -
HLW - - - -
Italy
VLLW - - 37 073 43 385 [2065]
LLW - - 33 327 39 000 [2065]
ILW - - - -
HLW - - - -
Latvia
VLLW 0 0 - -
LLW 783 1 883 1 883 -
ILW 35 35 35 -
HLW - - - -
Lithuania
VLLW 7 651.6 21 000 53 500 -
LLW - - 114 417 -
ILW - - - -
HLW - - - -
Luxembourg
VLLW - - - -
LLW - - - -
ILW - - - -
HLW - - - -
Malta
VLLW - - - -
LLW - - - -
ILW - - - -
40
Disposed RAW (Volume as disposed, m3)
Country RAW 2023 2030 2050 Other date
HLW - - - -
The
Netherlands
VLLW - * - - -
LLW - - - -
ILW - - - -
HLW - - - -
Poland
VLLW - - - -
LLW 2 768.4 - - -
ILW 577.5 - - -
HLW - - - -
Portugal
VLLW - - - -
LLW - - - -
ILW - - - -
HLW - - - -
Romania
VLLW - - - -
LLW 2 461 - - -
ILW - - - -
HLW - - - -
Slovakia
VLLW 23 941.76 - - -
LLW 20 862.36 - - -
ILW - - - -
HLW - - - -
Slovenia
VLLW - - - -
LLW - - - -
ILW - - - -
HLW - - - -
Spain
VLLW 25 670 45 000 110 000 125 000 [2100]
LLW 36 157 46 000 90 000 94 200 [2100]
ILW - - - 3 900 [2100]
HLW - - - 13 [2100]
Sweden
VLLW 30 500 52 000 63 000 -
LLW 40 600 60 000 140 000 -
ILW 0 0 5 000 -
HLW - - - -
* No information on VLLW inventory is registered in the Netherlands.
41
Table I.6. Comparison of global European Union radioactive waste in disposal
(m3, rounded to thousands)17
Disposed 2013 2016 2019 2023 2030*
Total waste 1 279 000* 1 420 000 1 552 000 1 692 000 -
VLLW 279 000 369 000 462 000 558 000 -
LLW 987 000 1 039 000 1 067 000 1 113 000 -
ILW 12 000 12 000 22 000 21 000 -
HLW 0 0 0 0 -
* The Commission estimate is primarily based on the information reported by Member States and on the
other sources when information was not available in the fourth national reports.
17 Except for HLW, which is rounded to hundreds.
42
Table I.7. Comparison of global European Union radioactive waste and spent fuel in
storage (m3, rounded to thousands)18
Stored 2013 2016 2019 2023 2030*
Total SF 49 800 52 700 55 600 59 600 66 900
Total waste 771 000 796 000 783 000 901 000 -
VLLW 236 000 233 000 233 000 303 000 -
LLW 358 000 381 000 353 000 385 000 -
ILW 173 000 178 000 191 000 208 000 -
HLW 4 300 4 500 4 800 5 200 -
* The Commission estimate is primarily based on the information reported by Member States and on the
other sources when information was not available in the fourth national reports.
18 Except for HLW, which is rounded to hundreds.
43
Table I.8. Comparison of global European Union radioactive waste and spent fuel –
Total (m3, rounded to thousands)19
Total 2013 2016 2019 2023 2030*
Total SF 49 800 52 700 55 600 59 600 66 900
Total waste 2 050 000 2 216 000 2 334 000 2 593 000 3 204 000
VLLW 515 000 601 000 695 000 861 000 1 171 000
LLW 1 345 000 1 420 000 1 421 000 1 497 000 1 778 000
ILW 185 000 190 000 213 000 229 000 247 000
HLW 4 300 4 500 4 800 5 200 7 700
* The Commission estimate is primarily based on the information reported by Member States and on the
other sources when information was not available in the fourth national reports.
19 Except for HLW, which is rounded to hundreds.
ET ET
EUROOPA KOMISJON
Brüssel, 29.9.2026 COM(2026) 512 final
KOMISJONI ARUANNE NÕUKOGULE JA EUROOPA PARLAMENDILE
nõukogu direktiivi 2011/70/Euratom rakendamise kohta ning ülevaade ühenduse
territooriumil olevate kasutatud tuumkütuse ja radioaktiivsete jäätmete kohta ja
osutatud materjalide tekkimise tulevikuprognoos
NELJAS ARUANNE
{SWD(2026) 285 final} - {SWD(2026) 286 final}
2
1 SISSEJUHATUS ................................................................................................................. 3
2 RADIOAKTIIVSED JÄÄTMED JA KASUTATUD TUUMKÜTUS EUROOPA
LIIDUS ................................................................................................................................ 4
2.1 Radioaktiivsete jäätmete ja kasutatud tuumkütuse päritolu ....................................... 4
2.2 Ülevaates esitatud hinnangud ..................................................................................... 4
3 RADIOAKTIIVSETE JÄÄTMETE JA KASUTATUD TUUMKÜTUSE OHUTU JA
VASTUTUSTUNDLIK KÄITLEMINE............................................................................. 5
3.1 Riiklikud raamistikud ja programmid ........................................................................ 5
3.2 Pädevad asutused ........................................................................................................ 6
3.3 Ringsus- ja lõppladustamispoliitika ........................................................................... 6
3.4 Kulude hindamine ja rahastamine .............................................................................. 7
3.5 Programmi rakendamise jälgimine ja aruandlus ........................................................ 7
3.6 Läbipaistvus ja üldsuse osalemine ............................................................................. 8
4 JÄRELDUSED .................................................................................................................... 8
3
1 SISSEJUHATUS
Direktiivi 2011/70/Euratom1 (kasutatud tuumkütuse2 ja radioaktiivsete jäätmete3
vastutustundliku ja ohutu käitlemise kohta) (edaspidi „direktiiv“) artikli 14 lõike 2 alusel on
komisjon kohustatud esitama Euroopa Parlamendile ja nõukogule korrapäraselt
• aruande direktiivi rakendamisel tehtud edusammude kohta ning
• ülevaate Euroopa Aatomienergiaühenduse (edaspidi „ühendus“) territooriumil
olevate radioaktiivsete jäätmete ja kasutatud tuumkütuse kohta ning osutatud
materjalide tekkimise tulevikuprognoosi.
Esitatav teave põhineb liikmesriikide aruannetel, mis esitatakse iga kolme aasta tagant
vastavalt direktiivi artikli 14 lõikele 1; liikmesriikide viimane aruande esitamise tähtaeg oli
23. august 2024. Käesolev neljas aruanne hõlmab ajavahemikku 2021–2023. Aruandele on
lisatud kaks komisjoni talituste töödokumenti:
• ühes tutvustatakse üldist olukorda ühenduses, tuginedes komisjoni tehtud
liikmesriikide aruannete analüüsile,
• teises esitatakse ühenduse radioaktiivsete jäätmete ja kasutatud tuumkütuse ülevaade
ning tulevikuprognoos 2023. aasta detsembri seisuga.
Komisjon on juba esitanud kolm eduaruannet (2017., 2019. ja 2024. aastal), millest igaühes
antakse põhjalik ülevaade direktiivi rakendamisest. Käesolevas aruandes kirjeldatakse vaid
mõnda üksikut muutust võrreldes 2024. aasta aruandes4 kajastatud olukorraga, mistõttu jääb
enamik komisjoni järeldusi kehtima. 2025. aastal algatas komisjon kõrvuti nõukogu
direktiivi 2006/117/Euratom (radioaktiivsete jäätmete ja kasutatud tuumkütuse vedude
järelevalve ja kontrolli kohta) hindamisega direktiivi hindamise5.
2. jaos antakse ülevaade radioaktiivsete jäätmete ja kasutatud tuumkütuse varudest ühenduses.
3. jaos esitatakse kokkuvõtlik hinnang direktiivikohaste riiklike raamistike ja programmide
rakendamise hetkeseisu kohta, tuues välja hiljutised edusammud ja lahendamata probleemid.
(1) Nõukogu 19. juuli 2011. aasta direktiiv 2011/70/Euratom, millega luuakse ühenduse raamistik kasutatud tuumkütuse ja
radioaktiivsete jäätmete vastutustundlikuks ja ohutuks käitlemiseks (ELT L 199, 2.8.2011, lk 48, ELI:
http://data.europa.eu/eli/dir/2011/70/oj). (2) Kasutatud tuumkütus on „tuumkütus, mida on kiiritatud ning mis on reaktori südamikust jäädavalt eemaldatud“ (direktiivi artikli 3
punkt 11) ning mis ei ole selle praegusel kujul enam kasutatav. See tekib tuumareaktorite kasutamisel elektrienergia tootmiseks ning
teadus-, koolitus- ja tutvustamistegevuses. (3) Radioaktiivsed jäätmed on „gaasilises, vedelas või tahkes olekus radioaktiivne aine“, mille edasist kasutust ei nähta ette ega kaaluta
(direktiivi artikli 3 punkt 7) ning mis on liigitatud radioaktiivseteks jäätmeteks. Radioaktiivsed jäätmed tekivad elektrienergia
tootmisel tuumaelektrijaamades või radioaktiivsete materjalide kasutamisel muudes valdkondades kui energeetika, näiteks meditsiinis, teaduses, tööstuses või põllumajanduses. Direktiivis sätestatud muude oluliste mõistete (nt „ladustamine“ ja
„lõppladustamine“) määratlused leiab komisjoni talituste töödokumendist SWD(2026) 286 nõukogu direktiivi 2011/70/Euratom
rakendamisel tehtud edusammude kohta. (4) Komisjoni aruanne nõukogule ja Euroopa Parlamendile nõukogu direktiivi 2011/70/Euratom rakendamise kohta ning ülevaade
ühenduse territooriumil olevate kasutatud tuumkütuse ja radioaktiivsete jäätmete kohta ja osutatud materjalide tekkimise
tulevikuprognoos – kolmas aruanne, https://ec.europa.eu/transparency/documents-register/detail?ref=COM(2024)197&lang=et.
(5) Hindamisprotsess hõlmas ka tagasisidekorjet ja avalikku konsultatsiooni (2026. aastal), vt https://ec.europa.eu/info/law/better-
regulation/have-your-say/initiatives/14619-Radioaktiivsete-jaatmete-direktiiv-ja-vedude-direktiiv-hindamine_et.
4
2 RADIOAKTIIVSED JÄÄTMED JA KASUTATUD TUUMKÜTUS EUROOPA
LIIDUS
2.1 Radioaktiivsete jäätmete ja kasutatud tuumkütuse päritolu
Radioaktiivseid jäätmeid tekitavad mitmesuguse tegevusega – alates meditsiiniseadmete
kasutamisest kuni elektrienergia tootmiseni – kõik liikmesriigid. Lõviosa radioaktiivsetest
jäätmetest tekib tuumaelektrijaamades ja asjaomase tuumkütusetsükliga seotud tegevuse
käigus, väiksemas koguses radioaktiivseid jäätmeid tekib radioaktiivsete materjalide
kasutamisel muudes valdkondades kui energeetika.
Iga liikmesriik määrab ise kindlaks oma elektrienergiaallikate jaotuse. 2023. aastal tegutsesid
tuumaelektrijaamad 12 riigis6. Kolm riiki – Saksamaa, Itaalia ja Leedu – olid oma
tuumaenergiaprogrammi lõpetanud ja dekomisjoneerisid oma tuumarajatisi.
2023. aastal oli kasutusel 101 tuumareaktorit,7 74 tuumareaktorit olid lõplikult suletud ja neid
dekomisjoneeriti ning kolm tuumareaktorit olid täielikult dekomisjoneeritud. Lisaks tegutses
12 riigis8 30 uurimisreaktorit.
Kasutatud tuumkütust käitlevad praegu oma territooriumil 17 liikmesriiki.
Tuumaelektrijaamade dekomisjoneerimine on Euroopa tuumatööstuse jaoks väga oluline
tegevus. Tuumarajatisi dekomisjoneeritakse praegu veerandis liikmesriikides ja
dekomisjoneerimisel tekkivate radioaktiivsete jäätmete kogus üha suureneb.
2.2 Ülevaates esitatud hinnangud
2023. aasta lõpuks oli radioaktiivsete jäätmete hinnanguline kogus ELis 2 593 000 m3 (mis
tähendab keskmiselt alla 65 000 m3 aastas ja 11 % suurust kasvu pärast eelmist
aruandeperioodi). Ülevaade radioaktiivsete jäätmete kogusest 2023. aastal võrreldes
2019. aastaga on esitatud tabelis 1. Ligikaudu 66 % (1 692 000 m3) neist jäätmetest oli
lõppladustatud ning 34 % (901 000 m3) ladustatud ja vajas edasist käitlemist. 2023. aasta
lõpuks moodustasid 99,5 % ELi radioaktiivsete jäätmete üldkogusest tuumaenergiaprogrammi
omava 15 liikmesriigi radioaktiivsed jäätmed9.
Enamik liikmesriike esitas radioaktiivsete jäätmete ülevaate, kasutades Rahvusvahelise
Aatomienergiaagentuuri (IAEA) ohutusjuhendis GSG-1 sisalduvat klassifitseerimissüsteemi,10
või esitas maatriksid, mis võimaldavad teisendada andmed nende riiklikust
klassifikatsioonisüsteemist IAEA soovitatud klassifikatsioonisüsteemi. Samuti esitas enamik
riike oma ülevaates ühtlustatud andmeid, mille on määranud üheskoos kindlaks komisjon,
IAEA ja OECD Tuumaenergia Agentuur.
(6) Belgia, Bulgaaria, Tšehhi, Soome, Prantsusmaa, Ungari, Madalmaad, Rumeenia, Slovakkia, Sloveenia, Hispaania ja Rootsi. Peale
selle – ehkki Horvaatia enda territooriumil ühtki tuumaelektrijaama ei ole – on Horvaatia koos Sloveeniaga Krško
tuumaelektrijaama kaasomanik. (7) Vt IAEA tuumareaktorite teabesüsteem aadressil https://www.iaea.org/pris.
(8) Vt IAEA uurimisreaktorite andmebaas aadressil https://nucleus.iaea.org/rrdb/home#/home.
(9) Belgia, Bulgaaria, Tšehhi, Soome, Prantsusmaa, Saksamaa, Ungari, Itaalia, Leedu, Madalmaad, Rumeenia, Slovakkia, Sloveenia,
Hispaania ja Rootsi. (10) „Classification of Radioactive Waste. General Safety Guide“ (Radioaktiivsete jäätmete klassifikatsioon. Üldine ohutusjuhend),
IAEA, Viin, 2009.
5
Andmete põhjal tundub, et riikides, kus lõppladustatakse väga väikese radioaktiivsusega ja
madalaktiivseid radioaktiivseid jäätmeid, kulgeb protsess jäätmete tekkest kuni jäätmete
lõppladustamiseni sujuvalt. Keskmise radioaktiivsusega jäätmete, kõrgaktiivsete
radioaktiivsete jäätmete ja kasutatud tuumkütuse puhul see nii ei ole, kuna praegu puuduvad
nende käitlemiseks toimivad lõppladustamisrajatised.
Tabel 1. Radioaktiivsete jäätmete kogus ELis 2019. ja 2023. aastal
Jäätmed ELi radioaktiivsete jäätmete kogus (m3, ümardatud
tuhandeteni*)
Klass Ladustatud Lõppladustatud Kokku
Aasta 2019 2023 2019 2023 2019 2023
Väga väikese
radioaktiivsusega
jäätmed
233 000 303 000 462 000 558 000 695 000 861 000
Madalaktiivsed
radioaktiivsed
jäätmed
353 000 381 000 1 068 000 1 109 000 1 421 000 1 491 000
Keskmise
radioaktiivsusega
jäätmed
191 000 211 000 22 000 25 000 213 000 236 000
Kõrgaktiivsed
radioaktiivsed
jäätmed
4 800 5 200 0 0 4 800 5 200
Kokku (m3) 782 000 901 000 1 552 000 1 692 000 2 334 000 2 593 000
* Välja arvatud kõrgaktiivsete radioaktiivsete jäätmete kogused, mis on ümardatud sadadeni.
2023. aasta lõpuks oli ladustatud ELis ligikaudu 59 500 raskmetalli tonni kasutatud
tuumkütust (umbes 6 % rohkem kui 2019. aastal). Kogu ELi kasutatud tuumkütus on praegu
ladustatud, kuna maailmas ei tegutse ühtki tsiviilotstarbelist kasutatud tuumkütuse
lõppladustamise rajatist. Väike kogus kasutatud tuumkütust saadetakse endiselt
ümbertöötamisele väljapoole ELi, seega on oodata ümbertöötamisel tekkivate radioaktiivsete
jäätmete tagasi saatmist hiljemalt järgmistel kümnenditel.
3 RADIOAKTIIVSETE JÄÄTMETE JA KASUTATUD TUUMKÜTUSE OHUTU
JA VASTUTUSTUNDLIK KÄITLEMINE
3.1 Riiklikud raamistikud ja programmid
Riiklikud raamistikud on kõikjal ELis viimastel aastatel üldiselt jätkuvalt paranenud. Selle
positiivse arengu üheks liikumapanevaks jõuks on enesehindamine, mida tugevdab
rahvusvaheline vastastikune eksperdihindamine.
Üks peamisi direktiivist tulenevaid kohustusi on töötada välja riiklik programm – riiklik
strateegiline (tegevus)kava, milles sätestatakse, kuidas rakendatakse või hakatakse rakendama
riiklikku poliitikat. Riiklik programm on olemas kõigil liikmesriikidel ja liikmesriigid
6
arendavad neid pidevalt edasi. Aruandeperioodil teavitasid komisjoni oma ajakohastatud
riiklikust programmist 11 liikmesriiki. Paraku esines ka seda, et liikmesriik ei vaadanud oma
programmi läbi ega ajakohastanud seda nii korrapäraselt, nagu on ette nähtud tema
riigisisestes õigusaktides. Riiklike programmide pidev rakendamine ja vajaduse korral kiire
ajakohastamine on märk radioaktiivsete jäätmete ja kasutatud tuumkütuse vastutustundlikust
käitlemisest. Liikmesriigid peavad sellega seoses optimeerima planeerimist, eraldama
piisavad vahendid, viima läbi vajalikud teadusuuringud ja koolitused ning tagama üldsuse ja
muude sidusrühmade kaasamise.
Ühtki direktiivi ülevõtmise või riikliku raamistikuga seotud kestvat rikkumist praegu ei ole.
Samas tuli komisjonil algatada eelmistes aruandlustsüklites mõne liikmesriigi suhtes mitu
menetlust, mis puudutasid direktiivi rakendamist ja riikliku programmi vastavust direktiivi
nõuetele. 2025. aasta lõpus oli pooleli 16 rikkumismenetlust11.
3.2 Pädevad asutused
Riiklikes aruannetes esitatud teabest on näha, et pädevad reguleerivad asutused on tehniliselt
ja rahaliselt sõltumatud.
Riiklike programmide ohutuks ja tõhusaks rakendamiseks on oluline, et reguleerivatel
asutustelt on piisavalt töötajaid. Hiljuti taas tärganud huvi tuumaenergiaprojektide vastu ja
suurenenud investeeringud nendesse projektidesse tähendab, et liikmesriigid peavad
ennetavalt tugevdama oma pädevaid asutusi, sealhulgas radioaktiivsete jäätmete ja kasutatud
tuumkütuse ohutuks käitlemiseks. Komisjon on esitanud viimases tuumaenergia
näidisprogrammis12 uute reaktorite ja pikaajalise käitamisega seotud vajaduste analüüsi, võttes
arvesse, et liikmesriikidel on erinevad haldustavad.
3.3 Ringsus- ja lõppladustamispoliitika
Tekitatavate radioaktiivsete jäätmete ja lõppladustatavate radioaktiivsete jäätmete kogus
peaks olema nii väike kui mõistlikult võimalik. Käimasoleva dekomisjoneerimistegevuse
puhul on eriti ilmsed sellised võimalused nagu materjalide vabastamine regulatiivsest
kontrollist ja nende hilisem korduskasutamine või ringlussevõtt.
Kuigi enamik liikmesriike kavatseb lõppladustada radioaktiivseid jäätmeid ja kasutatud
tuumkütust oma territooriumil, ei ole kõik neist teinud lõplikku otsust ja mõned kaaluvad ikka
veel ühiseid rahvusvahelisi lõppladustamise lahendusi. Komisjon viis ellu katseprojekti
„Ettepanek radioaktiivsete jäätmete suhtes kohaldatava Euroopa ühise lähenemisviisi
kohta“,13 kaasates foorumi loomisse võimalikult palju riiklikke ametiasutusi, et arutada
võimalikke ühiseid jäätmekäitluslahendusi Euroopas.
(11) Austria, Belgia, Bulgaaria, Taani, Saksamaa, Eesti, Iirimaa, Kreeka, Horvaatia, Itaalia, Läti, Leedu, Madalmaade, Portugali
Rumeenia ja Sloveenia suhtes. (12) Komisjoni 10. märtsi 2026. aasta teatis „Euratomi asutamislepingu artikli 40 kohaselt esitatud tuumaenergia näidisprogramm –
lõplik versioon (pärast Euroopa Majandus- ja Sotsiaalkomitee arvamuse saamist), COM(2026) 120 final, https://eur-
lex.europa.eu/legal-content/ET/TXT/?uri=celex:52026DC0120.
(13) Euroopa Parlamendi liikmete algatusel lisati katseprojekti rahastamine ELi eelarvesse, vt
https://energy.ec.europa.eu/document/download/b74f0a8f-ef96-45ce-8301-
5c8d86b9c5d1_en?filename=C_2023_4577_1_EN_annexe_acte_autonome_nlw_part1_v1.pdf.
7
Liikmesriigid, kellel on tuumaenergiaprogramm, kavatsevad lõppladustada oma kasutatud
tuumkütuse sügaval asuvatesse geoloogilistesse rajatistesse. Mõni riik töötab oma kasutatud
tuumkütust ümber, teised on selle võimaluse endale varuks jätnud.
Esimene kasutatud tuumkütuse lõppladustamise rajatis peaks alustama tegevust Soomes
2027. aastaks. Rootsis ja Prantsusmaal on käimas sarnaste rajatiste ehitamiseks
investeerimisprojektid, mis viiakse eeldatavasti lõpule järgmisel kümnendil. Võrreldes
eelmise aruandega teeb rohkem liikmesriike aktiivselt tööd erinevates sügaval asuvate
geoloogiliste rajatiste ettevalmistamise etappides. Kõrgaktiivsete radioaktiivsete jäätmete ja
kasutatud tuumkütuse sügaval asuvate geoloogiliste hoidlate kavandatud kasutuselevõtu
kuupäevad jäävad enamjaolt vahemikku 2050–2075.
3.4 Kulude hindamine ja rahastamine
Peaaegu kõik liikmesriigid esitasid teabe oma riikliku programmi kulude hindamise kohta.
2023. aastal oli radioaktiivsete jäätmete ja kasutatud tuumkütuse käitlemise hinnanguline
kogukulu14 ELis ligikaudu 300 miljardit eurot, mis on kooskõlas komisjoni varasemate
aruannetega.
Riikide hinnangud on metoodika, eelduste, andmete täielikkuse, ulatuse ja hõlmatud
ajavahemiku poolest väga erinevad, kuna riikide erinevad olud nõuavad erinevaid
lähenemisviise. Suurema läbipaistvuse ja rahastamiskindluse saavutamiseks teeb komisjon
tuumavaldkonna lõppfaasi finantsaspektide eksperdirühma15 kaudu liikmesriikidega koostööd,
et anda suuniseid radioaktiivsete jäätmete ja kasutatud tuumkütuse käitlemise riiklike
programmide kuluaruandluse kohta.
Enamik liikmesriike esitas teavet ka riiklike programmide rakendamiseks kehtestatud
rahastamiskavade kohta, kus võetakse arvesse kasutatud tuumkütuse ja radioaktiivsete
jäätmete tekitajate vastutust. Neis kavades on märkimisväärseid erinevusi: mõni liikmesriik
tugineb elektritoodangu põhjal kogutavale tasule, mõni jäätmete omadustel põhinevatele
maksetele, mõni riigieelarvele.
Kuna kulud tekkivad tavaliselt alles pärast radioaktiivsete materjalide või tuumkütuse
kasutamist – mõnel juhul aastakümneid hiljem –, tuleb uue tuumaenergiaalase tegevuse
varajases etapis arvesse võtta lõppfaasi kulusid. Komisjon juhib tuumaenergia
näidisprogrammis tähelepanu sellele, et selleks, et tagada ohutus ja jätkuv avalik toetus
tuumaenergia kasutamisele, on väga oluline valitsuste pühendumus ning jäätmetekitajate
poolne piisav rahastamine tõhusaks dekomisjoneerimiseks ning radioaktiivsete jäätmete ja
kasutatud tuumkütuse vastutustundlikuks käitlemiseks.
3.5 Programmi rakendamise jälgimine ja aruandlus
Mitu liikmesriiki on teinud edusamme peamiste tulemusnäitajate kasutamisel riikliku
(14) „Radioaktiivsete jäätmete käitlemise hinnanguline kogukulu“ on kõigi ELi liikmesriikide selliste kulude kogusumma, mis tekivad
seoses riikliku programmiga, mis hõlmab liikmesriigi jurisdiktsiooni alla jäävat igat liiki kasutatud tuumkütust ja radioaktiivseid
jäätmeid ning nende käitlemise kõiki etappe alates tekkimisest kuni lõppladustamiseni. (15) https://ec.europa.eu/transparency/expert-groups-register/screen/expert-groups/consult?lang=en&groupID=3777.
8
programmi rakendamise jälgimiseks. Tõhusa edusammude jälgimise ja tulemusaruandluse
tagamisega on siiski endiselt probleeme.
Aruandlus radioaktiivsete jäätmete ja kasutatud tuumkütuse käitlemise lahenduste
rakendamiseks vajaliku teadus-, arendus- ja tutvustamistegevuse kohta oli enamikul juhtudel
väga üldine. Liikmesriike kutsutakse üles esitama nende tegevuste kohta täpsemat ja
sihipärasemat teavet. Komisjonil on hea meel märkida, et enamik liikmesriike kasutab
käimasolevat radioaktiivsete jäätmete käitlemise Euroopa partnerlust16.
3.6 Läbipaistvus ja üldsuse osalemine
Liikmesriigid ei ole teatanud läbipaistvust ja üldsuse osalemist käsitlevate meetmete ja
lähenemisviiside olulisest ajakohastamisest. Komisjon kordab, kui oluline on tõhusalt
rakendada läbipaistvuse ja üldsuse osalemise nõudeid, sealhulgas esitada komisjonile aru
andes konkreetset teavet tavade kohta.
4 JÄRELDUSED
Aruandeperioodil käideldi radioaktiivseid jäätmeid ja kasutatud tuumkütust liikmesriikides
ohutult. Riiklikud raamistikud ja programmid on olemas kõikjal ELis ning need on enamasti
kehtestatud läbipaistval ja kaasaval viisil. Kõik liikmesriigid peaksid tagama, et nende riiklik
programm on ajakohane. Enesehindamise ja rahvusvahelise vastastikuse eksperdihindamise
süsteem tundus vastavat vajadustele ning ajendas jäätmekäitlust ajakohastama ja pidevalt
täiustama.
Enamiku radioaktiivsete jäätmete käitlemiseks kasutati ohutuid lahendusi (sh
lõppladustamine), mida näitab taas lõppladustatud koguste suurenemine ja ladustatud koguste
vähenemine. Enamik liikmesriike teeb tööd lõppladustamisrajatiste ehitamiseks. Paraku ei ole
mitmes riigis ikka veel radioaktiivsete jäätmete ja kasutatud tuumkütuse käitlemiseks selgelt
määratletud strateegiat ning see takistab nende edusamme.
Peamine lahendamata probleem on liikmesriikide riiklike programmide rakendamise
jälgimine ja rahastamine, mis vajab riiklike ametiasutuste tähelepanu. Kuluhinnangud on
mõnikord aegunud või ei ole piisavalt põhjalikud. See võib mõjutada rahastamiskavade
tõhusust ja tekitada ohu, et neist ei piisa tulevaste kulude katmiseks, millega pannakse
tulevastele põlvkondadele põhjendamatu koormus. Suuniste koostamisega riiklike
programmide kulude aruandluse kohta juba tegeletakse17. Siiski on veel valdkondi, kus
liikmesriikidel oleks aruannete koostamisel abiks konkreetsemad aruandluskriteeriumid.
(16) https://www.ejp-eurad.eu/.
(17) Tuumavaldkonna lõppfaasi finantsaspektide eksperdirühm (https://ec.europa.eu/transparency/expert-
groups-register/screen/expert-groups/consult?lang=en&groupID=3777) töötab välja kasutatud tuumkütuse
ja radioaktiivsete jäätmete käitlemise riikliku programmiga seotud kulude aruandlust käsitlevaid
suuniseid.
EN EN
EUROPEAN COMMISSION
Brussels, 29.9.2026 SWD(2026) 286 final
COMMISSION STAFF WORKING DOCUMENT
Progress of implementation of Council Directive 2011/70 EURATOM
Accompanying the document
REPORT FROM THE COMMISSION TO THE COUNCIL AND THE EUROPEAN
PARLIAMENT
on progress of implementation of Council Directive 2011/70 EURATOM and an
inventory of radioactive waste and spent fuel present in the Community's territory and
the future prospects - FOURTH REPORT
{COM(2026) 512 final} - {SWD(2026) 285 final}
1
Contents
1. Introduction ........................................................................................................................ 3
2. National policies and frameworks for the safe and responsible management of radioactive
waste and spent fuel ................................................................................................................... 4
2.1. National policies ........................................................................................................ 4
2.1.1. General considerations ....................................................................................... 4
2.1.2. Import of radioactive waste and joint approaches towards radioactive waste
disposal 6
2.1.3. National policy developments............................................................................ 8
2.2. National programmes ................................................................................................. 8
2.3. National legal and organisational frameworks ........................................................ 13
2.4. Regulatory framework and competent regulatory authorities ................................. 13
2.5. Licence holders ........................................................................................................ 19
3. Implementation of national programmes ......................................................................... 23
3.1. Progress monitoring and key performance indicators (KPIs) .................................. 23
3.2. Implementation status .............................................................................................. 24
3.3. Self-assessments and international peer reviews ..................................................... 33
4. Cost assessments, financing mechanisms and available resources .................................. 37
5. Expertise, skills and R&D................................................................................................ 51
5.1. Expertise and skills .................................................................................................. 51
5.2. Research and development ...................................................................................... 51
6. Transparency and public participation ............................................................................. 53
2
List of abbreviations and acronyms
ARTEMIS Integrated review service for radioactive waste and spent fuel
management, decommissioning and remediation programmes
DGR Deep geological repository
DSRS Disused sealed radioactive source
ENSREG European Nuclear Safety Regulators Group
EU European Union
KPI Key performance indicators
HLW High-level waste
IAEA International Atomic Energy Agency
ILW Intermediate-level waste
IRRS International Regulatory Review Service
LILW Low- and intermediate-level waste
LLW Low-level waste
NORM Naturally occurring radioactive material
NPP Nuclear power plant
RAW Radioactive waste
SF Spent fuel
VLLW Very low-level waste
3
1. Introduction
This staff working document presents the Commission’s assessment of the European Union
(EU) Member States’ notifications on the implementation of Council Directive
2011/70/Euratom on the responsible and safe management of spent fuel and radioactive waste
(the ‘Directive’)1. The assessment is based on information derived from the national
programmes for the management of spent fuel and radioactive waste2 and national reports on
the implementation of the Directive3.
This document provides background information on the main findings, progress, challenges,
and trends presented in the Fourth Commission Report COM(2026) 512 to the Council and the
European Parliament on the progress of implementation of Council Directive 2011/70/Euratom
and an inventory of radioactive waste and spent fuel present in the Community’s territory and
future prospects.
All Member States had submitted their fourth national reports to the Commission by November
20244. For the first time, the deadlines for reporting under the Joint Convention5 and submitting
national reports on the implementation of the Directive to the Commission were the same
(23 August 2024). Two Member States took advantage of this opportunity and compiled a
single report to fulfil both reporting obligations. During the reporting period (2021-2024), 11
Member States notified the Commission of their updated national programmes.
1 Council Directive 2011/70/Euratom of 19 July 2011 establishing a Community framework for the
responsible and safe management of spent fuel and radioactive waste (OJ L 199, 2.8.2011, p. 48, ELI:
http://data.europa.eu/eli/dir/2011/70/oj). 2 Article 13(1) and Article 15(4) of the Directive. 3 Article 14(1) of the Directive. 4 As per the Directive, the deadline for submission of national report was 23 August 2024. 5 The Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste
Management. Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive
Waste Management | IAEA
4
2. National policies and frameworks for the safe and responsible
management of radioactive waste and spent fuel
The Directive’s overarching objective is to ensure the responsible and safe management of
radioactive waste and spent fuel to ‘avoid imposing undue burdens on future generations’6. To
achieve this, Member States are required to put in place and maintain national policies for the
long-term responsible and safe management of radioactive waste and spent fuel. Member States
must also put in place and maintain a national legislative, regulatory and organisational
framework for radioactive waste and spent fuel management. The framework must include the
adoption of a national programme for the implementation of national radioactive waste and
spent fuel management policies7.
2.1. National policies
2.1.1. General considerations
Each Member State bears ultimate responsibility for the management of the radioactive waste
and spent fuel it generates. It is up to the Member States to set the optimal policies based on
national circumstances and needs (e.g. whether to reprocess or dispose of spent fuel, or whether
to build a single disposal facility for all radioactive waste or several facilities for different waste
types).
All Member States have enshrined the principles set out in Article 4(3) of the Directive in their
legislation to serve as the basis of their national policies. These principles are:
• keeping the generation of radioactive waste to a minimum;
• ensuring that the interdependencies between all steps in radioactive waste and spent
fuel management are taken into account;
• ensuring the safe management of radioactive waste and spent fuel and passive safety
features for long-term safety;
• applying a graded approach to the implementation of measures for radioactive waste
and spent fuel management;
• ensuring that the costs of managing radioactive waste and spent fuel are borne by those
who generated those materials;
• applying evidence-based and documented decision-making processes at all stages of
radioactive waste and spent fuel management.
6 Article 1(1) of the Directive. 7 Article 5(1)(a) of the Directive.
5
All Member States have set out in their laws and regulations that the prime responsibility for
managing radioactive waste and spent fuel generated within their territory lies with the licence
holder. In cases where this is not feasible, such as when the licence holder has disappeared or
gone bankrupt, the Member State assumes ultimate responsibility. The practical
implementation of this principle is reflected in the obligations of licensees, including bearing
the costs of that management or setting up national waste management organisations.
Comprehensive national policies for the management of radioactive waste and spent fuel have
been put in place in most Member States. During this reporting cycle, no Member State
reported any changes its policies.
• Management of spent fuel from nuclear power plants
Nuclear fuel that has been removed from the reactor following irradiation and is no
longer usable in its present form is considered to be spent. This spent fuel requires safe
management. This typically involves initial cooling in a spent fuel pool to reduce heat
and radiation levels, followed by storage and either direct disposal or reprocessing.
Most Member States managing spent fuel have opted for a direct disposal policy, and
only a few Member States currently continue with the spent fuel reprocessing policy.
Historically, more Member States opted for reprocessing spent fuel; nevertheless, in
recent years, the trend has shifted towards direct disposal. However, despite this shift,
a few Member States have declared that they have not necessarily discarded
reprocessing as an option for the future.
Where reprocessing occurs in another country and in line with Article 4(2) of Council
Directive 2011/70/Euratom, the country of origin of the spent fuel remains responsible
for the safe and responsible disposal of the spent fuel and any resulting radioactive
waste.
• Management of spent fuel from research reactors
The most common policy for the management of spent fuel from research reactors is to
send it back to the supplier, especially in the case of highly enriched uranium fuel. When
this is not possible, spent fuel from research reactors is managed is the same way as
spent fuel from nuclear power plants.
• Management of radioactive waste
In line with international standards and practices and depending on the nature of the
radioactive waste and national circumstances, national policies for safe radioactive
waste management are centred on safe storage and disposal.
A number of countries have been exploring the possibility of putting in place joint
solutions with other countries for radioactive waste management. In 2023, the European
Parliament adopted a pilot project called a ‘Proposal for a Joint European Approach
towards Radioactive Waste’. The aim was to enable policymakers to assess, on the basis
6
of data, whether pooling European resources to deal with radioactive waste would make
sense. The Commission (Directorate-General for Energy) responded to the European
Parliament’s initiative by launching two parallel projects in 2024: (i) a compendium of
knowledge; and (ii) a consultation on a joint European approach towards radioactive
waste.
• Management of disused sealed radioactive sources
The usual policy for managing disused sealed radioactive sources is to send them back
to the supplier. When that is not possible, they are stored until suitable disposal facilities
are available or alternative management solutions are found.
Although progress is being made, there are still a few Member States that have not fully put in
place their policy to manage all their radioactive waste and spent fuel in the long term. In
general, most of those Member States have in any case taken some fundamental decisions so
that the absence of policies for some waste classes does not jeopardise the progress on their
national programmes. About half the Member States are considering the construction of new
large-scale nuclear power reactors (> 1 GWe/reactor). Notably, all countries planning to install
large-scale nuclear power reactors are also interested in small modular reactors. These planned
changes in energy policy are expected to be followed up with updates to the national
programmes.
2.1.2. Import of radioactive waste and joint approaches towards radioactive
waste disposal
Although the Directive mandates that radioactive waste be disposed of in the Member State
where it was generated, Article 4(4) of the Directive provides for exceptions under certain
conditions, which allows for disposal in another Member State or a non-EU country.
Most Member States prioritise disposing of their radioactive waste and/or spent fuel within
their own territory. However, exporting radioactive waste for disposal8 to another Member
State or a third country is an option considered by several Member States, particularly those
without a nuclear power programme or those with research reactors and relatively small
quantities of radioactive waste (RAW) and/or disused radioactive sources. While many
Member States are exploring regional or shared disposal facilities as a complementary option
to developing their own disposal solutions, approximately two thirds of Member States prohibit
the import of radioactive waste or spent fuel for disposal.
8 Disposal is defined in Article 3(3) of the Directive as ‘the emplacement of spent fuel or radioactive waste
in a facility without the intention of retrieval’.
7
Table 1 provides a broad classification of national policies on the import of radioactive waste
for disposal and the search for joint approaches to dispose of waste. These policies have
remained unchanged since the previous reporting cycle.
Table 1: Policies for radioactive waste import and joint approach towards RAW disposal9
Import for disposal(*) Joint approach towards RAW
disposal(**)
AT Not permitted Option
BE In use10 Not considered / discarded
BG Prohibited Option
HR Prohibited Option
CY Prohibited Option
CZ Prohibited Option
DK Not permitted Option
EE Prohibited Option
FI Prohibited Prohibited
FR Prohibited11 Not indicated
DE Not indicated Prohibited
EL Prohibited Option
HU Not indicated Option
IE Prohibited Prohibited
IT Not indicated Option
LV Prohibited Option
LT Prohibited Option
LU Prohibited In use10
MT Prohibited Option
NL Not permitted Not considered / discarded
PL Prohibited Option
PT Prohibited Not indicated
RO Prohibited Option
SK Prohibited Option
SI Not permitted Option
ES Not indicated Not indicated
SE Prohibited Prohibited
9 Member States’ (MS) abbreviations in this report are as follows: Austria (AT), Belgium (BE), Bulgaria
(BG), Croatia (HR), Cyprus (CY), Czechia (CZ), Denmark (DK), Estonia (EE), Finland (FI), France (FR),
Germany (DE), Greece (EL), Hungary (HU), Ireland (IE), Italy (IT), Latvia (LV), Lithuania (LT),
Luxembourg (LU), Malta (MT), The Netherlands (NL), Poland (PL), Portugal (PT), Romania (RO),
Slovakia (SK), Slovenia (SI), Spain (ES) and Sweden (SE). 10 Agreement between Luxembourg and Belgium. 11 French law prohibits the disposal of foreign radioactive waste on French territory, except for waste from
the Principality of Monaco.
8
(*) Prohibited – import for disposal explicitly prohibited by law; Not permitted – there is no explicit
prohibition, but import is still not allowed due to other regulatory or practical constraints.
(**) Option – Member State explores possibilities for joint approaches for disposal; Not considered /
discarded – Member State does not consider or discarded joint approaches for disposal.
2.1.3. National policy developments
National reports typically provide updates on the development of national policies, but
approximately one third of the reports lack detailed information on the practical
implementation of these policy principles. Furthermore, the current reporting period did not
reveal any significant changes in national policies, as indicated in the national reports.
2.2. National programmes
Member States are required to put in place national programmes for the management of
radioactive waste and spent fuel. These programmes should outline the measures, time frames
and milestones for the practical implementation of national policies. Currently, all Member
States have these national programmes.
In line with Article 11(2) of the Directive, Member States are required to regularly review and
update their national programmes. To comply with this requirement, all Member States have
set out a clear legal framework that outlines the responsibilities for reviewing, updating, and
implementing their national programmes, including specific arrangements, deadlines, and
conditions for these processes. Table 2 provides an overview of: (i) the organisations
responsible for developing national programmes in each Member State; (ii) the organisations
responsible for approving them; and (iii) the requirements for how often they need to be
reviewed and updated. However, in some cases, the same organisation is responsible for both
developing and approving the programme. This is not considered to be good practice as it may
compromise the independence and objectivity of the review process.
Approximately two thirds of Member States have incorporated a regular review cycle into their
national frameworks, specifying the time frame in which a review or update of their national
programmes should be conducted. However, despite this, some Member States have already
encountered difficulties in meeting these deadlines, primarily due to protracted or delayed
approval and adoption procedures. As of mid-2025, four Member States had failed to review
and update their national programmes within the prescribed time frame outlined in their
national legislation, highlighting the challenges in complying with prescribed schedules.
In addition to the legal requirements, infringement procedures or recommendations from
ARTEMIS peer review missions often serve as catalysts for reviewing and updating national
programmes. These review and update mechanisms play a crucial role in driving the continuous
improvement of national programmes and frameworks.
9
As regular reviews and updates of national programmes are mandatory, the Commission
expects Member States to submit their updated programmes in line with Article 13(1) of
Directive. Since 2022, 11 Member States have notified their updated national programmes (see
Figure 1), which in some cases involved changes to the overall strategy and timelines for
activities. However, in most instances, the updates resulted in the postponement of
implementation milestones by several years, largely reflecting the current delays in the
implementation of national programmes.
Some national programmes only outline activities for a specific period, typically spanning 5-
10 years. At the end of this period, Member States are expected to prepare and legally approve
an updated national programme for the subsequent period. To prevent similar issues to those
mentioned above, Member States are encouraged to optimise their planning and adoption
processes, thereby guaranteeing the continuity of their national programmes.
In general, nearly all national programmes cover all types of radioactive waste and spent fuel
generated within the Member States’ territories. Nevertheless, only about one third of the
programmes include comprehensive plans for all waste streams, from generation to disposal.
Some Member States with nuclear power plants in operation have yet to make a final decision
on the long-term management of spent fuel and continue to keep several options open, such as
shared disposal, reprocessing and direct disposal. Despite this, the default strategy for most
Member States is to proceed with the direct disposal of spent fuel.
As noted in the previous report, Member States with nuclear power programmes tend to focus
on the management of radioactive waste and spent fuel generated by the nuclear industry but
provide limited or no information on the management of institutional radioactive waste.
Unfortunately, this situation remains unchanged since the previous report, highlighting the
need for more attention to this aspect of radioactive waste management.
10
Figure 1: Timeline of releases of the latest national programmes and their expected next
reviews
Timeline in blue: as set by Member State.
Timeline in green: no period set by Member State
11
Table 2: Member State national programmes under Directive 2011/70/Euratom – Reference date: June 2023.
Organisation responsible for developing the programme Approving organisation Latest
release Review and update
AT Federal Ministry for Agriculture and Forestry, Climate and Environmental
Protection, Regions and Water Management (BMLUK)
Federal government 2022 No period set
BE Committee of the National Programme (⁕) Federal Council of Ministers 2024 No period set
BG Ministry of Energy Council of Ministers 2015 Every 5 years
HR Ministry of Interior Government 2022 No period set
CY Minister of Labour and Social Insurance (MLSI) Ministry of Industry and Trade 2015 Every 10 years
CZ Ministry of Trade and Industry Government 2019 Every 10 years
DK Danish Health Authority Ministry of the Interior and
Health
2020 No period set
EE Ministry of Climate Ministry of Climate 2019 Every 10 years
FI The Ministry of Economic Affairs and Employment and the Ministry of Social
Affairs and Health
Ministry of Economic Affairs
and Employment
2022 Every 10 years
FR Working group (GT PNGMDR) (⁕⁕⁕) Ministry of Ecological
Transition
2022 Every 5 years
DE Federal Ministry for the Environment, Nature Conservation, Nuclear Safety and
Consumer Protection
Federal Cabinet 2015 No period set
EL Greek Atomic Energy Commission (EEAE) Minister of Development and
Investments
2023 At least every 10
years
HU Ministry of Energy Government 2016 Every 5 years
IE Department of Environment, Climate and Communication Government 2021 No period set
IT Ministry of the Ecological Transition Government 2019 Every 3 years
LV Ministry of Environmental Protection and Regional Development Council of Ministers 2021 Every 7 years
LT Ministry of Energy Government 2021 Every 10 years
LU Minister of Health and Social Security Minister of Health and Social
Security
2015 No period set
MT Radiation Protection Commission Radiation Protection
Commission
2022 No period set
NL Ministry of Infrastructure and Water Management Parliament 2016 Every 10 years
12
Organisation responsible for developing the programme Approving organisation Latest
release Review and update
PL Ministry of Energy Council of Ministers 2020 Every 8 years
PT
Portuguese Environment Agency (APA) Council of Ministers 2022 First update in 5
years, then every 10
years
RO Nuclear and Radioactive Waste Agency (ANDR) Government 2022 At least every 5
years
SK National Nuclear Fund Government 2015 Every 6 years
SI Slovenian Nuclear Safety Administration (SNSA) (⁕⁕⁕⁕) National Assembly 2023 Every 10 years
ES National radioactive waste company (ENRESA) (⁕⁕) Council of Ministers 2023 No period set
SE Swedish Radiation Safety Authority (SSM) Ministry of Environment 2021 Every 10 years
(⁕) Comprised of representatives from the Federal Public Service responsible for Energy, the Belgian Agency for Radioactive Waste and Enriched Fissile Materials
(ONDRAF/NIRAS) and Synatom.
(⁕⁕) The legal basis requires the national radioactive waste company (ENRESA) to submit a draft update of the programme to the Ministry for the Environmental Transition
and the Demographic Challenge every 4 years or whenever so required by the Ministry.
(⁕⁕⁕) Led jointly by the Ministry for Energy and the French Authority for Nuclear Safety and Radiation Protection (ASNR).
(⁕⁕⁕⁕) ARAO provides the expert basis for the revision of the programme and based on this, SNSA prepares a draft national programme that is adopted by National
Assembly.
13
2.3. National legal and organisational frameworks
In line with Article 5(1) of the Directive, Member States are required to draw up and maintain
a comprehensive national legislative, regulatory, and organisational framework (the ‘national
framework’) for the management of radioactive waste and spent fuel. This framework must
clearly allocate responsibilities and provide for effective coordination between the relevant
competent bodies.
The Directive also required Member States to complete its transposition by 23 August 2013.
In the previous report12, it was noted that following a conformity assessment, the Commission
had identified five Member States with incomplete transposition. However, all these Member
States have since taken additional measures to ensure full compliance, and as a result all
infringement procedures on the incorrect transposition of the Directive have been closed.
In their fourth national reports, Member States provided an overview of the legal arrangements
and provisions that comprise their national framework, accompanied by a general summary of
the issues addressed in the updated arrangements. While some Member States provided
detailed information on the practical implementation of these legal provisions, others merely
listed new or amended legal acts without elaborating on their specific impact. For instance, it
was not always clear whether these changes affected the allocation of responsibilities or the
coordination between relevant competent bodies. Nevertheless, the national legal and
organisational frameworks in Member States with nuclear programmes are generally well-
established and advanced, likely due to the fact that relevant national laws were enacted before
the Directive.
Most Member States’ national frameworks incorporate provisions for updating and improving
the national framework, as required by Article 5(2) of the Directive, and clearly set out the
responsibilities of stakeholders. In general, the improvement of national frameworks is
primarily driven by international peer reviews.
All Member States have enacted laws or regulations that mandate the consideration of
operating experience, insights gained from decision-making processes, and advancements in
technology and research. However, despite this legal framework, most Member States failed
to provide sufficient details on how they actually integrate operating experience and research
findings into the development and review of their national frameworks in practice.
2.4. Regulatory framework and competent regulatory authorities
In line with the Directive’s requirements, Member States have established and maintain a
competent regulatory authority responsible for ensuring the safety of radioactive waste and
spent fuel management. As shown in Table 3, all Member States have designated national
12 Commission staff working document, Progress of implementation of Council Directive
2011/70/EURATOM, SWD(2024) 123 final.
14
competent authorities. While the majority of Member States have opted for a single competent
authority, others have established two or more organisations with distinct powers and
regulatory functions in different aspects of radioactive waste and spent fuel management. In
some cases, such as in Germany, regional regulatory authorities co-exist with federal or
national ones. However, the Commission has observed that the national reports lack sufficient
information on local or regional competent authorities responsible for radioactive waste
management, where applicable.
To improve regulatory supervision, four Member States have implemented changes to their
competent regulatory authorities during the reporting period. These changes include
establishing new authorities, reorganising existing ones, and consolidating functions, all aimed
at strengthening regulatory oversight.
• Functional independence
In line with Article 6 of the Directive, the regulatory Authority must maintain functional
separation from any other body or organisation involved in promoting or using nuclear
energy or radioactive material, or in managing radioactive waste and spent fuel.
Furthermore, the authority must possess legal powers, as well as sufficient human and
financial resources to discharge its obligations effectively.
Most Member States have declared the independence of their regulatory authorities
from organisations or bodies: (i) promoting or using nuclear energy; and (ii) managing
radioactive waste and spent fuel. In most cases, this functional or administrative
independence is enshrined in national law. The regulatory authority may be embedded
in a ministry or operate as an autonomous body, reporting to the national parliament,
council of ministries or government.
The majority of Member States have successfully demonstrated the functional
independence of their competent regulatory authorities. Since the previous Commission
report, two Member States have implemented specific measures to ensure and
strengthen the functional independence of their competent regulatory authorities. In
general, regulatory authorities in countries without nuclear power programmes tend to
be part of the central state administration and are typically small in size, proportionate
to the scale of the inventories of managed radioactive waste.
• Technical and financial capacity
In addition to functional and administrative independence, a regulatory authority’s
effective independence relies on its technical and financial capacity to fulfil its
responsibilities. Most Member States’ national reports provided information on the
measures in place to ensure technical and financial independence, such as guaranteeing
adequate human resources and funding through legislation, and charging fees to
licensees. However, only six Member States have provided clear or partial information
in their national reports on the actual financial resources available to their competent
15
regulatory authorities. To improve transparency and accountability, Member States are
encouraged to provide more comprehensive reporting on the financial resources
allocated to radioactive waste management in their future national reports.
• Human resources
The national reports of 23 Member States provided information on the human resources
of the competent authority, including the actual number of staff. By contrast, the other
Member States offered limited or no information, with some simply stating that
resources were sufficient without providing further details. In a few cases, Member
States only reported the number of positions allocated to the regulatory authority,
without indicating how many were filled. Despite maintaining stable overall staff
numbers since the last reporting period, a few Member States expressed concerns about
the high staff turnover rate. This creates challenges in preserving knowledge, training
new staff and building expertise.
However, staffing requirements for carrying out regulatory functions were often not
clearly specified, making it difficult to assess the adequacy of human resources on the
basis of the information provided. Furthermore, most Member States reported the total
number of staff in the regulatory authority without specifying the number of employees
directly involved in the safety of radioactive waste and spent fuel management
activities. This distinction is important, as a high overall staff number does not
necessarily guarantee sufficient human resources are allocated to these specific
activities.
During the reporting period, staff numbers remained stable or slightly increased in most
Member States. Nevertheless, these increases do not necessarily indicate an
improvement in the regulatory authority’s human resources situation, as they may have
followed staff cuts or recruitment freezes. Therefore, the actual impact of these changes
on the authority’s capacity to regulate safety effectively is unclear.
It is of note that, in several instances, the national reports submitted under the Joint
Convention provided more detailed information about the competent regulatory
authorities than the reports on the implementation of the Directive.
In summary, all Member States face challenges in maintaining adequate human resources in
the long term, a concern that has been confirmed by recent ARTEMIS peer review missions.
While progress has been made, further efforts are needed to demonstrate the technical
independence of competent regulatory authorities, particularly in Member States without
nuclear power programmes.
Most Member States (around three quarters) provided information on staff competence, the
availability of technical support organisations or expert support, and the mechanisms in place
16
to maintain staff competence. However, a few Member States did not report any information
on staff competence or the mechanisms for maintaining it. Additionally, some Member States
provided details on the appointment and dismissal processes for regulatory authority
management, aiming to demonstrate that management is shielded from undue influence in
carrying out its mission.
17
Table 3: National competent authorities for radioactive waste and spent fuel
management (⁕)
Competent authority Reporting to Staff (year)
AT
Federal Ministry for Climate Action, the
Environment, Energy, Mobility, Innovation and
Technology (BMK)
Federal government ~20 (2023)
BE Federal Agency for Nuclear Control (FANC) Minister of Internal Affairs and
Security ~150 (2024)
BG Nuclear Regulatory Agency (BNRA) Council of Ministers 114 (2024)
HR Civil Protection Directorate of Ministry of
Interior Ministry of Interior Planned 30 (2024)
CY Radiation Inspection and Control Service of
Ministry of Labour and Social Insurance Ministry of Labour and Social
Insurance 6 (2024)
CZ State Office for Nuclear Safety (SUJB) Prime Minister 218 (2023)
DK Danish Health Authority Ministry of the Interior and Health No data
Danish Emergency Management Agency Ministry of Resilience and
Preparedness
No data
EE Environmental Board Ministry of the Climate 18 (in the Radiation
Safety Department,
2024)
FI
Radiation and Nuclear Safety Authority
(STUK) Ministry of Social Affairs and
Health ~300 (189 related to
radioactive waste
and spent fuel
management, 2024)
FR French Authority for Nuclear Safety and
Radiation Protection (ASNR) Parliament 2270 (2025)
DE
Federal Office for Radiation Protection (BfS) Federal Ministry for the
Environment, Nature Conservation,
Nuclear Safety and Consumer
Protection
No data
Federal Office for the Safety of Nuclear Waste
Management (BASE) Federal Ministry for the
Environment, Nature Conservation,
Nuclear Safety and Consumer
Protection
No data
Federal states (Länder) Federal government No data
EL Greek Atomic Energy Commission (EEAE) Minister of Development 69 (2024)
HU Hungarian Atomic Energy Authority (HAEA) Prime minister 211 (2024)
IE Environmental Protection Agency (EPA) Government No data
IT National Inspectorate for Nuclear Safety and
Radiation Protection (ISIN) Government and Parliament 83 (2024)
[resources for 90]
LV Radiation Safety Centre of the State
Environmental Service (VVD RDC) Ministry of Environmental
Protection and Regional
Development
No data
LT State Nuclear Power Safety Inspectorate
(VATESI) Cabinet of Government and the
President 54 (2024)
Radiation Protection Centre (RPC) Ministry of Health 60 (2024)
18
Competent authority Reporting to Staff (year)
LU Radiation Protection Division of Ministry of
Health and Social Security (RDP) Minister of Health and Social
Security 15 (2024)
MT Radiation Protection Commission (RPC) Office of the Prime Minister 5 (2024) + 2 more
planned
NL Authority for Nuclear Safety and Radiation
Protection (ANVS) Ministry of Infrastructure and
Water Management 159 (2024)
PL National Atomic Energy Agency (PAA) Minister for Climate and
Environment 147 (2023)
[incl. 24 inspectors]
PT
Portuguese Environment Agency (APA) Ministry of Environment and
Energy 20 (2024)
General Inspection of Agriculture, Sea,
Environment and Spatial Planning
(IGAMAOT)
Direct administration exercised
jointly by Minister of the Economy
and Territorial Cohesion, Minister
of Environment and Energy,
Minister of Agriculture and
Maritime Affairs
15 (2023)
RO National Commission for Nuclear Activities
Control (CNCAN) Prime Minister 70 (2024)
SK Nuclear Regulatory Authority (ÚJD SR) Government and subsequently to
the National Council 134 (2024)
Public Health Authority (ÚVZ SR) Ministry of Health 40 (2020)
SI
Slovenian Nuclear Safety Administration
(URSJV) Ministry of Natural Resources and
Spatial Planning 43 (2024)
Slovenian Radiation Protection Administration
(URSVS) Ministry of Health No data
ES
Nuclear Safety Council (CSN) Parliament 432/210 (2023) – [Total staff / nuclear
safety and radiological
protection staff]
SE Swedish Radiation Safety Authority (SSM) Ministry of Climate and Enterprise 295 (2024)
(⁕) The data does not include staff of separate technical support organisations that exist in some Member States.
19
2.5. Licence holders
Under Article 7 of the Directive, licence holders bear primary responsibility for ensuring the
safe management of radioactive waste and spent fuel in Member States.
The national reports submitted by Member States provided limited information on the
implementation of Article 7, typically consisting of a brief summary of the relevant legal
requirements without any elaboration on their practical implementation, particularly during the
reporting period. Only the reporting on matters related to Articles 7(2) and 7(3) of the Directive
was more detailed. More than half the Member States provided information on regular safety
reviews and safety improvements, as well as on safety assessments conducted during the
reporting period.
• Human and financial resources
Most Member States reported that licence holders are legally obliged to provide and
maintain adequate financial and human resources to fulfil their safety obligations
relating to radioactive waste and spent fuel management. However, in most cases, this
information was not accompanied by details of the actual human and financial resources
available to licence holders, nor was there any information on how these resources have
evolved over time. Only a few Member States provided specific details on the status of
human resources, such as staff numbers. In some instances, general information was
provided on competence and skills management, which was often linked to Article 8,
while financial data was mostly referenced in relation to Article 12(1)(k). As a result, it
is difficult to determine whether Member States have effectively ensured that licence
holders have sufficient human and financial resources in place to meet their safety
obligations.
• Waste management organisations
A common feature among Member States is the presence of dedicated radioactive waste
management organisations, with all nuclear power and most non-nuclear power
Member States having such bodies in place. The list of radioactive waste management
organisations in the EU as of mid-2025 is provided in Table 4. These organisations are
typically public bodies, although there are some exceptions where they have been set
up by nuclear power plant operators. In both cases, the funding of radioactive waste and
spent fuel management activities is based on the ‘polluter pays’ principle, where those
who generate radioactive waste and spent fuel are responsible for covering the
associated costs. Some of these organisations also oversee the decommissioning of
shutdown nuclear installations. In certain cases, responsibility for a disposal facility is
transferred to the Member State after the facility’s closure.
The responsibilities of these waste management organisations vary across Member
States. In some cases, they are responsible for both predisposal and disposal activities,
ensuring a comprehensive approach to radioactive waste management. In other cases,
20
these organisations are only responsible for predisposal activities, such as storage and
treatment, or for disposal activities, such as operating a geological repository. Limited
responsibility for specific types of activities may be a result of a waste management
strategy that has not yet been fully developed. For example, a lack of a disposal strategy
is likely to result in responsibilities for disposal activities not clearly being assigned.
Since the publication of the third Commission report, there have been no significant
changes regarding the licence holders.
21
Table 4: Radioactive waste management organisations in the EU
Radioactive waste management organisation Type Responsibilities
AT Nuclear Engineering Seibersdorf GmbH (NES) Public/private Management of radioactive waste and decommissioning.
BE
Belgian Agency for Radioactive Waste and Enriched Fissile
Materials (ONDRAF/NIRAS)
Public Managing radioactive waste and spent fuel when declared as
radioactive waste. Responsible for establishment of long-term
solution for radioactive waste.
BG State Enterprise for Radioactive Waste (SERAW) Public Management of radioactive waste and spent fuel and
decommissioning.
CZ
Radioactive Waste Repository Authority (SÚRAO) Public Management of radioactive waste and spent fuel. Operation of LLW
disposal facilities. Development of deep geological disposal facility
for HLW and spent fuel.
DE
Federal Company for Radioactive Waste Disposal (BGE) Public/private
(⁕)
Responsible for establishment of disposal solutions.
Federal Company for Radioactive Waste Storage (BGZ) Private (†) Management of storage facilities of radioactive waste and spent fuel.
DK
Danish Decommissioning (DD) Public Management of radioactive waste and decommissioning.
Responsible for establishment of long-term solution for radioactive
waste and spent fuel.
EE
AS ALARA Public Management of radioactive waste and decommissioning.
Responsible for establishment of long-term solution for radioactive
waste.
ES
National radioactive waste company (ENRESA) Public (‡) Management of radioactive waste and spent fuel. Decommissioning
nuclear plants. Disposal of VLLW and LLW. Responsible for
establishment of disposal solution for ILW, HLW and spent fuel.
FI POSIVA Private (⁑) Responsible for disposal of spent fuel generated by its owners.
FR
National agency for management of radioactive waste
(ANDRA)
Public Management of radioactive waste and spent fuel. Disposal of VLLW
and LLW. Responsible for establishment of disposal solution for ILW
and HLW.
HR
The Fund for the Financing of the Decommissioning and Disposal
of Radioactive Waste and Spent Nuclear Fuel from Krško Nuclear
Power Plant
Public Coordination, preparation and development of the programme for
decommissioning the Krško NPP and the programme for the disposal
of radioactive waste from the Krško NPP.
HU Public Limited Company for Radioactive Waste Management
(PURAM)
Public Management of radioactive waste and spent fuel. Decommissioning
nuclear plants. Disposal of LLW and ILW.
22
Radioactive waste management organisation Type Responsibilities
IT
Company for the Nuclear Installations Management (SOGIN) Public Management of all radioactive waste and spent fuel.
Decommissioning of nuclear facilities. Responsible for establishment
of the disposal solution.
LT
State Enterprise Ignalina Nuclear Power Plant (INPP) Public Management of all radioactive waste and spent fuel.
Decommissioning of nuclear facilities. Disposal facility for VLLW.
Responsible for establishment of the disposal solution.
LV Latvian Environment, Geology and Meteorology Centre
(LEGMC)
Public Management of radioactive waste, disposal.
NL Central Organisation for Radioactive Waste (COVRA) Public Management of radioactive waste and spent fuel.
PL Radioactive Waste Management Plant (ZUOP) Public Management of radioactive waste, disposal of LLW.
PT Instituto Superiore Tecnico (IST) Public Management of radioactive waste.
RO Nuclear and Radioactive Waste Agency (ANDR) Public Coordination of the safe management of radioactive waste and spent
nuclear fuel.
SE
Swedish Nuclear Fuel and Waste Management Company (SKB) Private (⁑) Management of radioactive waste and spent fuel. Disposal of LLW.
Responsible for establishment of the disposal solution for ILW, HLW
and spent fuel.
SI
Agency for Radwaste Management (ARAO) Public Collecting, transporting, treating, storing and disposing of LLW and
ILW and for the disposal of HLW. Management of the closed uranium
mine.
SK Nuclear and Decommissioning Company (JAVYS) Public Management of radioactive waste and spent fuel. Decommissioning
of the nuclear power plants.
(⁕) Public body with private legal personality.
(†) Private law body under the sole ownership of the federal government.
(‡) State-owned company CIEMAT (80%) and SEPI (20%).
(⁑) Reactors licensees.
23
3. Implementation of national programmes
3.1. Progress monitoring and key performance indicators (KPIs)
The content of the national programme is outlined in Article 12 of the Directive, which states
that:
The national programmes shall set out how the Member States intend to implement their
national policies referred to in Article 4 for the responsible and safe management of spent fuel
and radioactive waste to secure the aims of this Directive, and shall include all of the following:
(a) the overall objectives of the Member State’s national policy in respect of spent fuel and
radioactive waste management; (b) the significant milestones and clear timeframes for the
achievement of those milestones in light of the overarching objectives of the national
programme; … (g) the responsibility for the implementation of the national programme and
the key performance indicators to monitor progress towards implementation.
The vast majority of Member States have set overall objectives for their national policies for
radioactive waste and spent fuel management. However, in several cases, the policies are
incomplete, as noted elsewhere in this document.
On milestones and clear time frames, most Member States have incorporated them into their
national programmes. Nevertheless, a few Member States have not identified any milestone,
or their time frames are vague, unrealistic or only cover the short term.
KPIs, together with objectives and milestones, to which they are closely connected but from
which they must be distinguished, are essential parts of the national programme. They enable
monitoring progress on programme implementation, on national policy implementation and,
ultimately, in achieving the Directive’s overarching objective of avoiding undue burdens on
future generations. Moreover, as KPIs enable monitoring of progress on national programme
implementation, they are also an important tool for ensuring transparency to the general
public13.
The Commission commissioned a study14 on KPIs and how they are applied in monitoring the
implementation of the national programmes. The study described the characteristics of good
KPIs, including clarity, auditability, threshold values to adopt corrective measures, and the
ability to update and reassess them. In summary, effective indicators enable effective
monitoring of national programme implementation progress.
13 Article 10 of the Directive provides that ‘Member States shall ensure that necessary information on the
management of spent fuel and radioactive waste be made available to workers and the general public. This
obligation includes ensuring that the competent regulatory authority inform the public in the fields of its
competence’. 14 European Commission, Directorate-General for Energy, Study on key performance indicators for
monitoring implementation of national programmes on safe and long-term management of spent fuel and
radioactive waste: final report, Publications Office of the European Union, 2022,
https://data.europa.eu/doi/10.2833/052078.
24
Setting and applying KPIs has been a persistent challenge for Member States since the first
report15 on the implementation of the Directive. Despite multiple reporting cycles, the
development and effective use of meaningful KPIs as a monitoring tool has continued to pose
a challenge, highlighting the need for further effort and improvement in this area.
The current situation shows little progress. Although a few countries have updated or recently
defined KPIs in their national programmes, more than half the Member States have not defined
KPIs or have defined set ones that lack the required characteristics mentioned above. In most
of these countries, progress is monitored through milestones, such as the construction of waste
storage or disposal facilities. A few countries use detailed multiannual plans for monitoring,
while others have defined KPIs but have not reported on them.
The lack of KPIs makes reporting on national programme implementation progress more
difficult and less clear. Progress is often communicated as a list of new activities, but it is
unclear how far the programmes are from their final objectives. Member States are encouraged
to identify suitable KPIs and use them more systematically to monitor and report on national
programme implementation progress.
3.2. Implementation status
With the exception of a few countries, national reports clearly indicate the progress made since
the last report. However, in some cases, information on progress is either missing or unclear.
In general, the implementation of national programmes has been delayed, ranging from a few
months to a number of years. These delays have accumulated over several reporting cycles and
are largely due to lengthy licencing procedures, changes in policy, or political decisions.
Although these delays have not compromised the population’s safety, they have hindered the
timely implementation of the programmes. Several countries have not reported clear timelines
or set out a long-term strategy, making it challenging to assess the progress of their
programmes.
Most countries have plans for storing all types of radioactive waste and disposing of short-lived
waste. However, decisions on the disposal of high-level waste and spent fuel are still pending
in most cases.
Compared with initial plans, the construction of disposal facilities has been delayed in most
countries. While there are no immediate concerns about the capacity for safe storage of existing
radioactive waste, some concerns remain about future waste generation.
15 Report from the Commission to the Council and the European Parliament on progress of implementation
of Council Directive 2011/70/Euratom and an inventory of radioactive waste and spent fuel present in the
Community’s territory and the future prospects, COM(2017) 236 final, COM(2017)236 - Register of
Commission Documents.
25
• Storage facilities
Most countries have put in place comprehensive strategies for the storage of all types
of radioactive waste and spent fuel. In line with those strategies, the construction,
modernisation, and extension of storage facilities are progressing, albeit with some
delays.
A limited number of Member States are near the maximum capacity of their existing
storage facilities for radioactive waste. In response, some of these Member States have
opted to implement waste reduction measures, rather than construct new storage
facilities or expand existing ones. These measures include the supercompaction of
waste and the application of clearance levels to release stored waste that meets the
relevant criteria, thereby freeing up space in existing storage facilities. While these
waste reduction strategies can help to optimise the use of existing storage capacity in
the short term, their effectiveness is limited in the longer term or in scenarios where
significant additional storage capacity is required to accommodate larger volumes of
waste. Therefore, it is essential for Member States to continue developing and
implementing comprehensive and sustainable strategies for the management of
radioactive waste, including the construction of new storage facilities or the expansion
of existing ones
During the reporting period, two Member States shipped spent fuel to facilities abroad
for reprocessing, in line with their national strategies for spent fuel management. In
total, six Member States are expected to receive returned waste, including vitrified
high-level waste and other by-products, from reprocessing operations (Table 5).
However, three Member States are currently facing significant challenges in
establishing suitable storage facilities to accommodate this returned waste, which is a
concern for the responsible management of radioactive waste. Furthermore, Member
States that have shipped spent fuel to the Russian Federation for reprocessing are
exposed to additional risks and uncertainties, including potential disruptions to
reprocessing services and returns of waste.
• Disposal facilities for spent fuel and/or high-level waste
Three Member States (Finland, Sweden and France) have made significant progress in
developing disposal facilities for high-level waste and/or spent fuel. Finland is on track
to start disposal operations in 202516, while Sweden is in the review phase of the
construction licence (2024). France is also making notable progress on the Cigéo site.
Although other countries with high-level waste or spent fuel have included deep
geological repositories (DGRs) in their national programmes, only four countries (in
16 Compared with initial plans, a delay of approximately four years was recorded due to licencing procedures.
Despite this, the Finnish DGR will be the first of a kind on a global scale.
26
addition to Finland, Sweden and France) have initiated research on siting. No concrete
action has been reported by other countries on this matter (Table 6).
Many Member States have chosen to keep the possibility of joint solutions with other
countries open, considering DGRs as a last resort. As a result, preparatory and siting
activities have stagnated and been pushed further into the future, with the exception of
Czechia, which has advanced the planned commissioning date for its DGR to 2050. The
planned commissioning dates for most repositories range from 2050 to 2075 (Figure 2).
Some Member States have already postponed milestones for site selection or the
commissioning of their DGR, and others plan to do so. One Member State has indicated
plans to construct a DGR but has not provided a time frame. The lack of concrete
progress on high-level waste and spent fuel disposal is a concern, particularly for
countries planning to build new reactors.
Figure 2: Planned start of operations of deep geological facilities
• Other disposal facilities
Progress with disposal facilities for other radioactive waste is proceeding according to
plans, although with some delays in most countries (Table 7). However, not all
countries have concepts and plans in place for the final disposal of radioactive waste –
some only have plans at the conceptual phase. Two countries have decided to export all
disused sources and radioactive waste to other countries, so there would be no need to
have a disposal facility on their territory. Other countries with only a very limited
amount of disused sealed sources and radioactive waste are considering similar
solutions. A few countries have delayed taking decisions on final disposal solutions,
including one with a nuclear power programme.
• Decommissioning
The decommissioning of shutdown nuclear installations is ongoing in several Member
States, and plans have been reported for operating installations. Decommissioning
generates large amounts of material, most of which released from regulatory control as
non-radioactive and then recycled or reused. The residual material is managed as
radioactive waste, primarily consisting of very-low-level and low-level waste, with
27
small quantities of intermediate-level waste. Progress in decommissioning is linked to
the availability of disposal sites for these types of waste.
In general, implementation of the national programmes is going according to schedule, with
some milestones met earlier than planned and others delayed, without jeopardising overall
implementation in the longer term.
Table 5: Return of by-products from spent fuel reprocessing to Member States
Type of material Timeframe
BG Return of HLW from spent fuel reprocessing in the Russian
Federation
After 2025
CZ Return of residual waste from highly enriched Uranium fuel
reprocessing in the Russian Federation First batch in 2024
Second batch in 2033
DE
The return of reprocessing waste from France was planned to be
completed in 2024. The completion of the return of reprocessing
waste from the UK is planned by 2026
2024 - 2026
ES Return of HLW from spent fuel reprocessing in France ~2029
IT Return of resulting waste from spent fuel reprocessing in France
and the UK
Not indicated
NL Return of HLW from spent fuel reprocessing in France At the latest in 2052
28
Table 6: Disposal facilities for high-level waste and spent fuel in the EU.
Status Siting/site Commissioning Operation
(years) Closure
Responsible
organisation Comment
BE Planned Not indicated ~2070 Minimum 100 ~2170 ONDRAF/NIRAS The licence for the geological disposal
facility is supposed to be granted by 2050.
BG Planned Dates not yet set SERAW
CZ
Planned 2030 2050 2176 SÚRAO Site selection by 2030; siting licence by
2032; building permit by 2036;
construction starting in 2038.
DE Planned By 2074 After 2094 BGE
DK Planned Not specified 2073 50 2122 Danish
Decommissioning
ES Planned 2029-2032 2074 2100 ENRESA
FI Construction Eurajoki (Olkiluoto) 2025 2120 POSIVA
FR Licence
application
Bure (Cigéo) 2035-2040 120 2155-2160 ANDRA
HR Planned 2050 (start of siting) 2068-2088 The Fund (•) Agreement with Slovenia: spent fuel
disposal continues as joint activity.
HU Planned Site selection ongoing 2063 2080s PURAM
LT Planned 2047 2058-2067 2068-2074 2075-2079 Ignalina NPP
NL Planned 2130 COVRA Decision to be taken around 2100.
PL Planned 2070 2070-2120 2120-2140 ZUOP
RO Planned 2025-2038 2055 ~100 ~2150 ANDR
SE Construction Forsmark 2034-2035 SKB AB
SI Planned 2045-2055 2065 10 2075 ARAO
SK Planned Site selection by 2030 2065 40-60 2105-2115 JAVYS
(•) Fund for Financing the Decommissioning of the Krško Nuclear Power Plant and the Disposal of Krško NPP Radioactive Waste and Spent Nuclear Fuel.
29
Table 7: Other disposal facilities in the EU
Status Site Commissioning
Planned
operation (years)
Responsible Comment
AT No decision on a disposal solution
BE Licence to construct
and operate
Dessel 2029 50 ONDRAF/NIRA
S
Near surface disposal facility for LLW
BG Construction Radiana/Kozloduy 2025 60 SERAW Disposal of LLW from nuclear facilities and nuclear
applications
HR Planned 2060 The Fund (•)
CY No decision on a disposal solution
CZ
Operation Dukovany 1995 95 SÚRAO Near surface disposal for radioactive waste from
NPPs
Closed Hostim / Beroun 1959 SÚRAO Closed in 1997
Operation Bratrstvi / Jáchymov 1974 SÚRAO Disposal facility for naturally occurring radioactive
materials (NORM) waste; closure is planned to start
in 2025
Operation Richard/Litoměřice 1964 SÚRAO Disposal facility for institutional radioactive waste
DK Planned 2073 Danish
Decommissioning
EE Planned Paldiski 2040 AS ALARA Planned near surface disposal of LLW together with
shaft for ILW
FI Operation Loviisa NPP 1998 FORTUM Intermediate depth disposal for LLW and ILW
Operation Olkiluoto NPP 1992 TVO Intermediate depth disposal for LLW and ILW
FR
Operation Centre de l’Aube 1992 ANDRA Near surface disposal for LLW
ClosedCentre de la Manche1969ANDRANear surface disposal for LLW
Operation Morvilliers-Cires 2003 ANDRA Landfill disposal for VLLW
DE Construction Konrad/Salzgitter Early 2030s 40 BGE Disposal facility (at least 800 m below the surface)
has been under construction since 2007
30
Status Site Commissioning
Planned
operation (years)
Responsible Comment
Remediation planned Wolfenbüttel, Lower
Saxony / Asse II salt
mine
1967 1978 BGE Retrieval of all disposed waste is planned
Closing Morsleben /
Endlager für
radioaktive Abfälle
Morsleben (ERAM)
1971 27 years BGE Disposal facility at least 480 m below the surface
EL
Planned ODRA, but
creation of a
waste
management
organisation is
planned
HU
Operation Püspökszilágy 1976 PURAM Near surface disposal for institutional radioactive
waste
OperationBátaapáti 2008 PURAM Intermediate depth disposal for LLW and ILW from
NPPs
IE Not planned
IT Planned SOGIN
LV
Operation Baldone 1962 Latvian
Environment,
Geology and
Meteorology
Centre
Near surface disposal for LLW and ILW
LT
Operation Ignalina 2024 Ignalina NPP Landfill disposal for VLLW
Construction Ignalina Ignalina NPP Near surface disposal for LLW
Planned Ignalina Ignalina NPP Planned conversion of the bituminous radioactive
waste storage facility into a near surface disposal
facility
LU Not planned
31
Status Site Commissioning
Planned
operation (years)
Responsible Comment
MT No decision on a disposal solution
NL
Operation Lelystad,
Middenmeer
Afvalzorg B.V. Landfill disposal for NORM waste
Operation Rotterdam Mineralz B.V Landfill disposal for NORM waste
PL
Operation Różan 1961 1961-2040 Radioactive
Waste
Management
Plant (ZUOP)
Near surface disposal for LLW
Planned 2033
2033-2152 Radioactive
Waste
Management
Plant
Near surface disposal for LLW
RO
Operation Baita Bihor 1985 55 IFIN-HH Near surface disposal for institutional radioactive
waste
Planned Saligny 2028 ANDR Near surface disposal for LLW from NPPs
SK Operation Mochovce 2001 JAVYS Near surface disposal for LLW
Operation Mochovce 2016 JAVYS Near surface disposal for VLLW
SI Construction Vrbina 2028 ARAO Near surface disposal for LLW together with shaft
for ILW
ES Operation El Cabril 1992 ENRESA Near surface disposal for LLW
Operation El Cabril 2008 ENRESA Landfill disposal for VLLW
SE
Operating Forsmark/SFR 1988
SKB AB Intermediate depth disposal for LLW
Planned SKB AB Intermediate depth disposal for ILW. Planned
application for licence in 2030
Operation Forsmark Forsmarks
Kraftgrupp AB
Landfill disposal for VLLW
Operation Oskarshamn /
Oskarshamn NPP
OKG AB Landfill disposal for VLLW
32
Status Site Commissioning
Planned
operation (years)
Responsible Comment
Operation Ringhals/Ringhals
NPP
Ringhals AB Landfill disposal for VLLW
Closed Studsvik/Studsvik
Tech Park
AB SVAFO Landfill disposal for VLLW
(•) The Fund for the Financing of the Decommissioning and Disposal of Radioactive Waste and Spent Nuclear Fuel from Krško Nuclear Power Plant
33
3.3. Self-assessments and international peer reviews
In line with Article 14(3) of the Directive, Member States are required to arrange for self-
assessments of their national framework, competent regulatory authority, national programme
and its implementation. They are also required to organise an international peer review of their
national framework, competent regulatory authority and/or national programme regularly and
at least every 10 years.
The aim of these self-assessments and international peer reviews is to ensure high safety
standards in managing radioactive waste and spent fuel. The Member States set out the scope,
timing and type of international peer reviews in line with Article 14(3) of the Directive. The
Directive had to be transposed by 2013, and subsequently, Member States had to conduct self-
assessments and invite international peer reviews for the first time by 2023. A Member State
must report the outcome of these international peer reviews to the Commission and to the other
Member States. The results may also be made publicly available, unless this would compromise
security and/or proprietary information. Most Member States only addressed regular self-
assessments and international peer reviews in a general way in their national programmes and
reports.
• Services for international peer reviews
While Member States are free to choose and devise the international peer reviews, the
International Atomic Energy Agency (IAEA) offers services in this area, which have
been the main method for carrying out international peer reviews for more than a
decade. The main advantages of carrying out reviews within the same system are the
guarantee of a higher level of consistency and the maintenance of pools of trained
experts. For these reasons, the Commission has been consistently supporting the IAEA
in setting up, developing, and maintaining these services.
• Integrated Regulatory Review Service (IRRS)17
The IRRS steers and drives Member States in strengthening and the effectiveness of
their regulatory infrastructure for nuclear, radiation, radioactive waste, and transport
safety. The IRRS is a tool to review competent regulatory authorities in a broader
context than that required by the Directive. Although the IRRS was set up before the
adoption of the Directive, it provides relevant results in line with the Directive.
In all Member States, a self-assessment of the competent authorities was carried out
through the IRRS. While the majority of Member States reported on IRRS missions,
only a few Member States provided details on the self-assessment outcomes of
radioactive waste and spent fuel management. IRRS mission reports are generally
publicly available; however, only a few Member States reported details of follow-up
action taken in response to the outcomes of these reviews in order to achieve a higher
17 https://www.iaea.org/services/review-missions/integrated-regulatory-review-service-irrs.
34
level of safety. Accordingly, compared with the previous reporting cycle, no
improvement has been noted; Member States should therefore give greater attention to
the outcomes of the peer reviews in future reports to the Commission.
• Integrated Review Service for Radioactive Waste and Spent Fuel Management,
Decommissioning and Remediation (ARTEMIS)18
When the Directive entered into force, dedicated international peer review services
were not available; therefore, since 2014 the Commission has been supporting the
IAEA in developing a self-assessment tool based on IAEA safety standards and best
practices to enable Member States to meet their self-assessment obligation
(Article 14(3) of the Directive). ARTEMIS is an integrated expert peer review service
for radioactive waste and spent fuel management, decommissioning and remediation
programmes.
As a result of intense work, all the peer review missions were carried out in a timely
manner19, and by the end of 2023, all Member States had completed the first round of
self-assessments and international peer reviews. Due to the disruptions caused by the
COVID-19 pandemic and to comply with the Directive’s requirement to have peer
review missions carried out in all EU Member States by 2023, the 18 Member States
had an ARTEMIS peer review during the reporting period. Additionally, Germany
conducted the ARTEMIS follow-up mission in 2022.
The Commission is closely following how the IAEA is developing and carrying out
ARTEMIS peer review services, not only through regular meetings with the IAEA, but
also by attending full-scope review missions as an observer.
• Synergies between international peer review services
Member States ensure compliance with Article 14(3) through IRRS and ARTEMIS
peer review missions (Table 8). Although the IAEA has worked to avoid overlaps
between ARTEMIS and IRRS review services, there are still challenges that require
further consideration.
Synergies between the ARTEMIS and IRRS missions have been explored in several
ways. The peer review mission to Spain in 2018 was the first, and so far, the only
occasion when a host country requested a joint IRRS and ARTEMIS peer review
mission. Despite some limited advantages, a number of challenges emerged in the
attempt to integrate IRRS and ARTEMIS peer reviews.
On the basis of this experience, Member States have preferred to proceed with separate
missions, with one taking place shortly after the other (preferably with the IRRS
18 https://www.iaea.org/services/review-missions/integrated-review-service-for-radioactive-waste-and-
spent-fuel-management-decommissioning-and-remediation-artemis.
19 https://www.iaea.org/services/review-missions/calendar.
35
mission followed by the ARTEMIS mission). This approach is referred to as ‘back-to-
back missions’. To avoid overlap between the missions, the IAEA has developed
additional guidance for back-to-back missions. The first back-to-back mission took
place in Slovenia in May 2022. Since then, 7 of the 14 IRRS and ARTEMIS peer review
missions requested by Member States (including Slovenia) have followed this
approach.
• Reporting
Under Article 14(3) of the Directive, Member States are required to report the outcomes
of international peer reviews of their national framework, competent regulatory
authority, and national programme to the Commission and the other Member States.
All Member States’ ARTEMIS and IRRS reports are published on the IAEA website
shortly after the completion of a mission. However, this is not considered a sufficient
means of reporting the outcomes of international peer review missions to the
Commission. Most Member States that have reported outcomes have chosen to submit
the peer review reports as a means of informing the Commission. By 2021, five Member
States had submitted their ARTEMIS peer review reports to the Commission. In the
current reporting cycle, an additional nine Member States notified the Commission of
their ARTEMIS peer review reports.
Some Member States have included a detailed presentation in their national reports of
the outcomes of the international peer review missions. However, several have not yet
reported these outcomes to the Commission. Therefore, Member States are encouraged
to do so in a timely manner in order to comply with Article 14(3).
36
Table 8: Recent and planned international peer reviews under Article 14(3) of the Directive
National programme and/or
national framework
[ARTEMIS]
Competent regulatory authority
[IRRS]
AT 2022 2018
BE 2023 (‡) 2023 (‡)
BG 2018 2024
CY 2022 2017
CZ 2023 (‡); 2027-2028 (*)(**) 2023 (‡); 2027-2028 (*)
DE 2019; 2022 (*) 2019; 2023 (*)
DK 2022 2021
EE 2019 2016; 2019 (*)
EL 2023 2012; 2017 (*)
ES 2018 (•); 2025 (*)2018 (•); 2025 (*)
FI 2022 (‡) 2022 (‡)
FR 2018 2014; 2017 (*)
HR 2023 2015; 2019 (*)
HU 2022 2015; 2018 (*)
IE 2021 2015; 2026
IT 2023 2016; 2026
LT 2022; 2027 (*) 2016; 2020 (*); 2026
LU 2018 2018
LV 2019 2019; 2024 (*)
MT 2022 2015; 2020 (*)
NL 2023 (‡) 2023 (‡)
PL 2017 2023; 2027 (*)
PT 2023 2022
RO 2022 2023
SE 2023 (‡) 2022 (‡)
SI 2022 (‡) 2022 (‡)
SK 2023 (‡) 2022 (‡); 2026 (*)
(*) Follow-up mission.
(**) Times for planned missions are in italics.
(‡) Back-to-back IRRS-ARTEMIS missions.
(•) Combined IRRS-ARTEMIS mission.
37
4. Cost assessments, financing mechanisms and available
resources
Article 9 of the Directive requires Member States to ensure adequate financial resources for
the implementation of their national programmes. In addition, Article 12(h) and (i) require each
Member State to have an estimate of the national programme costs and financing schemes in
force to ensure the financial resources.
All Member States provided information on the cost assessments of their national programmes,
although the estimates vary widely in terms of the methodology, assumptions, completeness of
data, scope and time frames (Table 9). Half the Member States (mainly those with nuclear
power programmes) have updated their cost estimates recently; however, there are several cost
estimates that have not been updated since 2015. In addition, these updates did not always
completely reflect cost developments in recent decades. Some Member States added additional
costs to their overall cost assessment but did not update the price level on which those
calculations were based; for example, in some cases the updated cost assessment was still
calculated using price levels from early 2000. As a cost estimate serves as a basis for providing
sufficient funding for the implementation of the national programme, it is important to
regularly review it and, when necessary, update it.
In the first Commission report, the total cost of radioactive waste and spent fuel management
in EU was estimated at around EUR 250 billion (2017). In the second Commission report, the
estimate was higher, at around EUR 300 billion20 (2019). This estimate remained at the same
level in the third report (2024) and has remained unchanged in the fourth review cycle.
Most Member States provided information on the financing schemes in force to implement
national programmes (Table 10). There are considerable differences in the schemes used by
different countries: a few Member States rely on a fee levied on electricity generation, others
rely on payments based on characteristics of the waste and some rely on state budget. No
changes to these financing schemes were reported during the reporting period.
More than half the Member States provided information on the status of the funds for
radioactive waste and spent fuel management, although with varying levels of detail. A few
Member States reported changes to electricity levies to ensure sufficient payments to the fund
following a cost assessment update. In most cases, Member States only applied corrective
measures (for example, by increasing payments to the fund) when it became clear that the
performance of the funds was below expectations. However, there were cases when Member
States acted proactively by regularly reviewing market conditions and adjusting payments to
the fund on the basis of these funds’ predicted future performance.
Overall, very little information was reported on the performance of the funds. The sufficient
and timely availability of funding is crucial for the implementation of the national programmes
20 These figures do not include the UK.
38
as planned. Member States are encouraged to regularly assess the performance of their funds
so they can proactively react to any changes and take corrective measures in a timely manner
when needed. Limited information was reported on the investments and management of the
funds that are required to ensure that sufficient funds will be available when needed in the
future.
The implementation of smaller national programmes (without nuclear power) is funded mainly
from the state budget. However, the national reports suggest that the required funding for
implementation of the national programmes is not always ensured, which leads to delays.
Member States that are funding their national programmes solely from the state budget are
encouraged to ensure that sufficient resources are allocated in a timely manner to support
implementation as planned.
Table 9: Estimated total cost of radioactive waste and spent fuel management based on
Member States’ programmes
Estimated total
costs
EUR million
(⁕)
(year of
estimation)
Cost of
decommissioning EUR million
Costs of
management of
radioactive waste
and spent fuel EUR million
Assumptions
AT
556 198:
Decommissioning
in Seibersdorf
18:
Decommissioning
of TRIGA reactor:
338 Costs up to 2045.
BE
17 857 (2022) 8 769 9 088 Costs up to 2150. The seven existing commercial
nuclear reactors will be in operation
for 40 years. The geological
disposal will take place between
2100 and 2110. The management of the radioactive
waste and spent fuel of future
nuclear installations is not
included.
BG
7 372 (2022) (BGN 14 455)
1 358:
Decommissioning
of Kozloduy units
1-4
1 600:
Decommissioning
of Kozloduy units
5-6
1 737:
Spent fuel
management
2 500:
Cost of the DGR
Cost assessment until 2051. Spent fuel management costs are
assessed on the assumption that
spent fuel will be reprocessed in
Russian Federation. The DGR cost estimates are
roughly based on other countries’
examples. Annual expenses by the SERAW
amount to approx. BGN 25 million
per year (BGN 1 = EUR 0.51).
HR 870.6 (2015) 192.8
The decommissioning costs will
occur after shutdown of the Krško
NPP in 2043.
39
Estimated total
costs
EUR million
(⁕)
(year of
estimation)
Cost of
decommissioning EUR million
Costs of
management of
radioactive waste
and spent fuel EUR million
Assumptions
CY 0.5 (2016)
Cost estimation is based on the cost
of repatriating disused sealed
radioactive sources (DSRSs).
CZ
5 020 (CZK 123.5
billion)
15:
Cost of manging
RAW from the
decommissioning
of NPPs and for
storing SF during
decommissioning
5:
Cost of processing
operational RAW in
the NPPs
3.3: Cost of processing
and storing
institutional RAW
14: Cost of managing
LILW, including
closure of
repositories
37.8: Cost of storing SNF
132:
Cost of constructing
and operating the
deep repository
Overall cost of implementation of
the concept for 2015-2100 (if there
are no new NPPs) (CZK 1 =
EUR 0.041).
DK
455
Cost of implementation of
Parliamentary Resolutions
B48/2003 and B90/2018: DKK 1.120 billion and DKK 2.271
billion, respectively (DKK 1 =
EUR 0.134)
EE 124
Cost for 2018-2050.
FI
2816 (2023) Cost of
decommissioning:
approx. 1 100
~ 5 000:
cost of SF disposal
~ 150:
cost of management
of operational waste
The assessment time frame is up to
~2120. Decommissioning costs cover
dismantling and disposal of the
radioactive waste in on-site disposal
facilities. Cost of spent fuel management
covers the construction, operation
and closure of the disposal facility,
R&D expenses, disposal activities
relating to the SF.
FR 110 500 (2014) 45 000 25 000:
geological disposal. Cost estimates up to 2135.
DE
66 900 (2012)
34 000:
Cost of
decommissioning
32 900 The cost of radioactive waste and
spent fuel management are up to
2080.
40
Estimated total
costs
EUR million
(⁕)
(year of
estimation)
Cost of
decommissioning EUR million
Costs of
management of
radioactive waste
and spent fuel EUR million
Assumptions
and management
(without disposal)
EL
9.95 or 10.7
(2023) Decommissioning
the research
reactor: 1.8
2.5:
Recycling DSRS and
nuclear materials
1.65: Classification of
legacy waste
1.5:
Upgrading existing
radioactive waste
management facility
Up to 1.95:
New disposal facility
1.3:
Management of
RAW until disposal
The cost will depend on the site of
the disposal.
HU
5 300 (2015) (HUF 1 650 402
million)
1 237 (2015) 4 063 (2015) Cost estimate is up to 2064. Cost estimate covers
decommissioning of 4 NPP units in
operation; decommissioning of
spent fuel interim storage facility;
radioactive waste disposal facilities;
HLW disposal facility; PURAM
operating costs, supervision fees,
fund management and support to
local governments.
(HUF 1 = EUR 0.0024 in 2024)
IE 0.6 (2022)
For 2022-2026.
IT
17 700 (2023) 7 880 for
completing the
decommissioning
of the 4 NPPs and
the nuclear fuel
cycle facilities
2030 (excluding geological
disposal).
LV
7.1 (2021) Maintenance and
decommissioning
of research reactor:
4.188
2.91:
Management and
development of
disposal facility
LT
5 323 (2016)
Cost estimate up to 2138: 2021-2030: EUR 1.001 billion,
mainly Ignalina NPP
decommissioning; 2031-2038: EUR 0.922 billion,
mainly Ignalina NPP
decommissioning;
41
Estimated total
costs
EUR million
(⁕)
(year of
estimation)
Cost of
decommissioning EUR million
Costs of
management of
radioactive waste
and spent fuel EUR million
Assumptions
2038-2138: EUR 3.4 billion, mainly
implementation of deep geological
repository and further
decommissioning activities.
LU
EUR 15 948 a
year
Up to 2029.
Only orphan sources and materials
considered. Cost of shipment to
Belgium and interim storage.
MT 0.433-0.901
Cost for 10 years.
NL
2 300 (2023) + EUR million
17.7 a year
2 300 (2023)
for the DGR.
~17.7 a year:
Cost of the above-
ground management
of radioactive waste
at COVRA: approx.
Up to 2130.
NL
2 300 (2023) +
17.7 a year
17.7:
Annual cost to
manage radioactive
waste
Up to 2130.
Deep geological repository cost
estimate: EUR million 2 300
(2023).
PL 3 680 (2018)
Up to 2152.
PT EUR 200 000 -
250 000 a year
Annual costs.
RO
EUR 4 864 + EUR 5.865
million EUR a
year
1 860 123.7 plus additional
5.7 a year:
predisposal activities
2 880 plus additional
0.165 a year:
Disposal costs
Decommissioning estimate for four
reactors.
SK
1 237 (2019)
No further details on
other SF and RAW
management costs.
No new information. These are only the total estimated
decommissioning costs for one of
the NPPs
SI
1 381 192.8 125.52, to be evenly
divided between
Slovenia and Croatia
= 62.76 each
LILW disposal costs:
136.88 in total, to be
evenly divided
between Slovenia
and Croatia = 568.44
each.
Cost of storing HLW
and SF
29.8:
Up to 2112. The immediate decommissioning
scenario. Cost of decommissioning does not
include cost of storing HLW and
SF. Costs shown for Slovenia are
half the total cost (based on the
agreements between Croatia and
Slovenia). LILW disposal construction,
operation and closure between 2024
and 2058. Cost of implementing the
programme of research,
development and demonstration
42
Estimated total
costs
EUR million
(⁕)
(year of
estimation)
Cost of
decommissioning EUR million
Costs of
management of
radioactive waste
and spent fuel EUR million
Assumptions
Costs of HLW and
SF disposal activities in the area of RAW and
SF management.
ES
28 156 (2023) of which
EUR 20 200 is
for 2024-2100.
5 787 of which
4 765 is for 2023-
2100
18 846 of which
15 453 for 2023-
2100
Estimate for 1985-2100, including
the incurred costs. Open cycle,
present fleet, closure of all
operating nuclear power plants by
2035.
SE
10 673 (2022) 659:
Costs already
incurred
2 084: future costs
3 537:
Costs already
incurred
7 117:
future costs
Reactors operating time of 60 years.
Reference takes into account
existing and planned facilities. Remaining basic costs from and
including 2024 (SEK 1 =
EUR 0.086).
(⁕) Otherwise specified.
43
Table 10: Financing mechanisms by Member State
Financing mechanisms Comments
AT
When radioactive waste is transferred to NES, the waste generator pays a fee consisting of two parts:
- a treatment fee to cover the costs of processing and interim storage by NES;
- a disposal fee (advance fee) that is collected by NES and transferred to the federal government, earmarked
specifically for financing the subsequent disposal of the waste.
However, Austria covers the cost of constructing the required management facilities and any major changes needed to
meet current technical standards.
Additionally, the federal government accepts responsibility for costs associated with the management and disposal of
radioactive waste where no other provision or funding mechanism is in place.
NES reviews their fees annually.
BE
The cost of radioactive waste and spent fuel management are financed through two main mechanisms:
- NPP operators’ financing mechanisms to cover their spent fuel and waste management activities, the
decommissioning of their installations and the transfer of waste to ONDRAF/NIRAS;
- financing mechanisms by ONDRAF/NIRAS for management of the waste it accepts, including disposal.
Three main funds below are in place.
i.A long-term fund is financed by producers every time they transfer radioactive waste to ONDRAF/NIRAS, under
a mechanism designed to ensure that ONDRAF/NIRAS can cover the fixed costs of storage and disposal, while
also meeting variable costs as they arise. ii.A medium-term fund is financed by contributions from the producers, calculated on the basis of the total
volumetric capacity of the disposal facility (surface or geological) and the total quantity of waste from each producer
intended for disposal in that facility. The obligation for producers to contribute to the fund begins as soon as the
disposal facility has received its nuclear construction and operating licence and the required non-nuclear permits.
The amount set by law must be fully established no later than three months after the disposal facility has been
authorised to start operations.
iii.An insolvency fund to finance waste management services following the bankruptcy or insolvency of the
financially liable bodies, as well as the management of orphan sources and radioactive waste. The fund is financed
by invoicing producers a reserve of 5% calculated on the costs of the transport, treatment, conditioning, storage,
and, since 2020, disposal services provided by ONDRAF/NIRAS.
The federal state is responsible for financing the management of historical waste from the specified sites.
- Every five years, ONDRAF/NIRAS
assesses whether the established and
planned provisions are in place and
sufficient to cover the management costs.
- Every three years, the Commission for
Nuclear Provisions assesses whether the
provisions for NPP operators are in place,
are sufficient and are available.
- Since 2019, fee increases related to the
long-term fund have been passed on to
producers on the basis of their full
radioactive waste production programme,
covering both waste already transferred to
ONDRAF/NIRAS and waste still to be
transferred.
BG
Kozloduy NPP covers the costs of managing radioactive waste and spent fuel before transfer to SERAW by incorporating
these costs into electricity prices.
Long-term liabilities for decommissioning nuclear power plants and managing radioactive waste by SERAW are covered
by two funds.
The financing system does not cover costs
related to deep geological disposal.
44
Financing mechanisms Comments
- The Radioactive Waste Fund covers costs of SERAW’s radioactive waste management activities, including waste
from Kozloduy NPP, nuclear applications, disused sealed radioactive sources, and legacy waste. The fund is financed
from contributions by the radioactive waste generators.
- The Nuclear Facilities Decommissioning Fund covers the decommissioning costs for Kozloduy NPP. The fund is
financed from contributions by the Kozloduy NPP. The decommissioning of units 1-4 is also supported by the
Kozloduy International Decommissioning Support Fund (KIDSF), set up to manage grants provided by the European
Commission.
Both funds are managed in separate accounts at the National Bank of Bulgaria, with financial management and supervision
carried out by the Ministry of Energy.
HR
The Fund for the Financing of the Decommissioning and Disposal of Radioactive Waste and Spent Nuclear Fuel from
Krško Nuclear Power Plant (the Fund) is the primary mechanism for financing radioactive waste and spent fuel
management. The Fund’s resources come from three main sources:
- quarterly payments from Hrvatska elektroprivreda d.d.;
- management fees paid to the Fund by generators and owners of radioactive waste and DSRS;
- payments from the Croatian state budget.
The state budget also covers the costs of the management of institutional waste already in storage, as well as the costs of
decommissioning and/or remediation of those research and storage facilities. The generators and owners of radioactive
waste and DSRS are responsible for providing resources for the management of other institutional waste and DSRS.
CY
Radioactive waste generators must bear all costs associated with managing their waste, from production to disposal,
including the cost of monitoring waste and waste storage (or in future, repositories after their closure) and the cost of the
required research and development.
The export/shipment (or in future, processing, conditioning or treatment) of radioactive waste for disposal is paid for by
the generator in the form of direct payments to the supplier/manufacturer of the sources or specialist organisations that
carry out these activities, wherever applicable.
The government is responsible for financing the management of radioactive waste where the generator no longer exists.
CZ
Funding of predisposal activities is ensured by the own resources of radioactive waste and spent fuel generators. The
costs of decommissioning, radioactive waste disposal, and spent fuel treatment and disposal are financed through the two
main mechanisms described below.
- The Nuclear Account Fund provides funding for the disposal of radioactive waste and spent fuel. The funds come
from various sources, such as fees from radioactive waste generators, revenue from financial market operations, and
interest from the nuclear account. The account is held at the Czech National Bank and administered by the Ministry
of Finance.
45
Financing mechanisms Comments
- Decommissioning reserves. Nuclear operators and facilities with significant sources of ionising radiation set up and
manage internal segregated funds, specifically intended to cover the future costs of decommissioning, thereby
ensuring that sufficient financial resources are set aside to meet these obligations.
Licensed operators authorised for the management of radioactive waste collect a fee from institutional waste generators
when the waste is delivered.
DK
The main mechanisms to finance radioactive waste and spent fuel management are the following.
- The state budget. The financial resources for implementation of the national programme come from reserve fund
allocations. These allocations are recorded as budget positions in the Financial Act, which is adopted annually by the
Danish parliament.
- Institutional waste generators are subject to management fees on delivery of waste to Danish Decommissioning.
Fees are kept at a modest level in order to preserve the incentive for delivering waste.
EE
Main mechanisms to finance radioactive waste and spent fuel management:
- the state budget, as the vast majority of the waste to be managed is legacy waste;
- institutional waste generators are subject to radioactive waste management fees on delivery of waste to
AS ALARA.
FI
Operators of nuclear facilities are responsible for financing the costs of the management of radioactive waste and spent
fuel and the decommissioning of reactors. Additional backup funds are collected in the Nuclear Waste Management Fund.
The obligation to make financial provision starts when the licence is granted for operations that produce nuclear or
radioactive waste. For new NPPs, the obligation to set assets in the Fund starts when the NPP has an operating licence
and fuel is loaded in the reactor.
Institutional waste generators are subject to radioactive waste management fees when waste is delivered for storage or
disposal.
FR
Waste generators must estimate and make financial provision for their future liabilities. Operators of basic nuclear
installations are required to maintain segregated assets, which are protected from company creditors and can only be
used to cover specific liabilities. By contrast, operators of installations classified on environmental protection
grounds that deal with radioactive waste are not required to have segregated assets, but must instead provide financial
guarantees that meet specific value and quality requirements.
DE
The main mechanisms to finance radioactive waste and spent fuel management are the following.
- The German Nuclear Waste Management Fund (KENFO) provides funding for the disposal costs of radioactive
waste from commercial nuclear power plants. The fund reimburses the federal government for the costs incurred
from the moment the disposal obligation was transferred under the Act on the Transfer of Nuclear Waste Liabilities.
The fund was created by transferring funds collected by NPP operators to the federal state.
- Provision made by nuclear power plant operators ensure funding for the decommissioning, dismantling, and
conditioning of radioactive waste in line with acceptance criteria set by BGE.
- Provisions made by nuclear fuel cycle facilities and other nuclear installations, for which waste management
costs are not covered by the KENFO.
- For post-closure financing of a disposal facility, the required funds are provided by the federal government.
46
Financing mechanisms Comments
- The financing of the decommissioning of public-sector nuclear installations and facilities, including the management
of associated radioactive waste, is ensured by the Federation and the Länder from the public budgets. The state also
bears the costs for the closure of the Morsleben repository for radioactive waste and the Asse II mine.
- Institutional waste generators pay a fee for the use of federal state collecting facilities, which ensure the long-term
management of radioactive waste. The fees are intended to cover all expenses associated with the subsequent
management of waste. A portion of these fees levied by the Land collecting facilities is related to the disposal of
radioactive waste and is forwarded directly to the Federation.
The decommissioning and associated waste management costs for the Joint Research Centre of the European Commission
in Karlsruhe are financed by the EU’s budget through a dedicated programme.
EL
Multiple sources are used to finance radioactive waste management, such as:
- the state budget;
- the deposit fund;
- the public investment programme and the Recovery and Resilience Facility.
HU
The primary mechanisms for financing decommissioning, radioactive waste management, spent fuel management, and
disposal costs is the Central Nuclear Financing Fund. Resources to this fund come from two main sources:
- annual payments from the Paks NPP for the management of radioactive waste and spent fuel generated during
operations and decommissioning;
- contributions from the state budget to cover the management of spent fuel and institutional radioactive waste from
the licence holders that are financed by the state.
Additionally, costs associated with the management of institutional waste from small waste generators are borne by the
generators themselves when the waste is transferred to the disposal facility.
IE
The costs for the disposal of radioactive waste are borne by the company responsible for generating the radioactive waste.
When the owner is unable to pay, the recovery of orphan sources or the storage of legacy sources is covered by the
Radioactive Waste Management Fund, which is financed from the state budget.
IT
Decommissioning and radioactive waste management for all publicly owned or financed nuclear installations are financed
from the state budget. By contrast, funding for the management of radioactive waste of industrial, medical, and research
origin is ensured by the waste generators themselves.
The decommissioning and waste management costs for the Joint Research Centre of the European Commission in Ispra
are financed from the EU’s budget through a dedicated programme.
LV
Radioactive waste generators are responsible for providing the financial resources for the management of their radioactive
waste. This includes covering the costs of transporting the waste to WMO, as well as the costs associated with preparing
the radioactive waste for disposal.
The state budget finances historical nuclear liabilities, including the operation of the disposal facility, and the
decommissioning of the Salaspils research reactor.
LT
The radioactive waste and spent fuel management activities are financed through the following channels.
- Decommissioning of Ignalina NPP and the management of associated radioactive waste and spent fuel are financed
from the EU budget and the state budget. These sources fund the development of all new radioactive waste
- Lithuania allocates at least EUR 3 million
annually to the Reserve (Stabilisation)
47
Financing mechanisms Comments
management facilities being built or planned as part of the Ignalina NPP decommissioning process. This process
includes the solid radioactive waste management and storage facility, the interim spent nuclear fuel storage facility,
and the landfill and near surface disposal facilities. Although the Ignalina programme’s funding is based on annual
commitments, which can be accumulated over several years to fund major radioactive waste management
infrastructure projects.
- The implementation of the deep geological repository is financed from a separate account within the Reserve
(Stabilisation) Fund. Contributions from the state budget are the main source of income.
- Institutional waste generators are responsible for paying for waste collection, transportation, treatment, storage, and
disposal services through contracts with the Ignalina NPP. The Ignalina NPP collects fees from institutional waste
producers in a separate dedicated account. The management of historical institutional waste is funded from either the
state budget or the municipal budget.
Fund, which is dedicated to collecting
funds for the DGR.
- An interinstitutional working group has
been set up to prepare proposals for
additional sources of income for the
Reserve (Stabilisation) fund and to
develop an optimised funding model for
the DGR implementation project and its
supervision.
LU
The cost of managing the radioactive waste sent to Belgium is paid by the Grand-Duchy of Luxembourg.
In addition, the Luxembourgish government covers all related transportation expenses, as well as the costs of radioactive
waste management from private individuals, public bodies, and radioactive material for which no legal holder has been
identified.
In all other cases, waste generators must bear all expenses.
MT
The licence holders are responsible for ensuring sufficient financial resources to cover radioactive waste management
costs.
The cost of the management of the country’s centralised storage facility is paid from central government funds.
NL
Radioactive waste generators are responsible for covering the cost of waste management. COVRA incorporates the
estimated cost of storage and geological disposal into the tariffs it charges to waste suppliers. A portion of the tariffs is
allocated to a fund, which is expected to grow over the storage period, ultimately covering the costs of both above-ground
storage and geological disposal.
Producers of NORM waste who wish to dispose of their waste at a designated landfill must pay a fee to the province
where the landfill is located. This fee is intended to cover the costs of operating the landfill, as well as the costs of
monitoring the site after closure. The province is responsible for the aftercare and the monitoring of landfills.
The decommissioning and associated waste management costs for the Joint Research Centre of the European Commission
in Petten are financed from the EU’s budget through a dedicated programme.
Once the tariffs are paid, the financial liability
for the waste is transferred to COVRA.
PL
Radioactive waste generators are responsible for ensuring the financing of their waste management, from generation to
disposal. The national WMO is authorised to charge fees for its services, which are reviewed annually.
Where waste has no identified owner or if the funds raised prove insufficient, the state budget will provide financing to
cover the shortfall.
PT
Radioactive waste generators are responsible for covering the costs associated with their waste management. They are
paying the fee for the delivery of the waste to the current storage facility. The difference between collected fees and actual
costs is covered by the general state budget and other Instituto Superiore Tecnico revenue.
Cost of decommissioning the research reactor will be covered by the state budget.
RO Radioactive waste and spent fuel management activities are financed through the following channels.
48
Financing mechanisms Comments
- The cost of spent fuel and radioactive waste management activities at Cernavoda NPP, including the commissioning
of the spent fuel dry storage, are covered by the operational costs.
- The decommissioning of Cernavoda NPP and the disposal of associated waste are financed from segregated accounts
at the national treasury, to which Cernavoda NPP makes an annual contribution.
- The financing of the Baita Bihor disposal facility, the decommissioning of the research reactor, and the management
of non-fuel cycle radioactive waste are primarily funded from the state budget.
SK
The primary mechanism for financing decommissioning, radioactive waste management, spent fuel management, and
disposal costs is the National Nuclear Fund. The fund ensures financing for the following activities:
- decommissioning of nuclear installations operated at the Jaslovské Bohunice site (A-1, V-1, and V-2 NPP);
- decommissioning and associated waste management of nuclear installations at the Mochovce site (Mochovce NPP
1-4);
- decommissioning of new nuclear installations commissioned after 1 January 2019, including the management of
radioactive waste from their decommissioning;
- management of nuclear materials of unknown origin and radioactive materials of unknown origin;
- implementation of disposal facilities;
- management of institutional radioactive waste.
The National Nuclear Fund’s resources are generated from mandatory contributions or payments, which are held in sub-
accounts or analytical accounts. These accounts also include income from depositing these funds and yields from financial
operations.
SI
Radioactive waste and spent fuel management activities are financed through the following channels.
- The costs of radioactive waste and spent fuel management, treatment, and storage are included in the operating costs
of the Krško NPP (NEK).
- The costs of disposing Slovenia’s share of radioactive waste and spent fuel are covered by a share of the revenue
from the sale of electricity generated by NEK. This share is paid by the direct owner of the Slovenian half of NEK,
i.e. GEN energija d.o.o., into the Fund for the Decommissioning of NEK.
- The planning of the construction and operation of the repository and disposal of half of the LILW from NEK is
financed mainly from the Fund for the Decommissioning of NEK and from the state budget. The key element that
decides how the division is to be made between the two funding sources is the proportion of waste from NEK (in
volume) and the proportion of waste from other sources (also in volume).
- The operation and decommissioning of the TRIGA Mark II research reactor, as well as the management of its
radioactive waste and spent fuel management, are financed from the state budget.
- Financing the management of institutional radioactive waste comes from the central government budget and the
payment made by users of the public service, i.e. when users deliver the waste to ARAO, the waste management
organisation.
49
Financing mechanisms Comments
- The financial resources for the operation of RŽV, d.o.o. (a public company) are provided solely through the central
government budget. The management, long-term surveillance and maintenance of both repositories will be financed
through the central government budget as part of the public utility service of radioactive waste management.
ES
The primary financing mechanism for implementing the General Radioactive Waste Plan is the Fund, which covers the
costs of managing radioactive waste and spent fuel from all facilities, as well as activities associated with the
decommissioning and dismantling of nuclear facilities. The decommissioning of other facilities is financed directly by
licensees.
The Fund is primarily financed by contributions from licence holders of nuclear and radioactive facilities, which are
legally classified as non-tax contributions to a specific-purpose public fund. The main categories of contributions are
described below.
- A non-tax public charge relating to: (i) tariffs for managing radioactive waste and spent fuel from NPPs that were
taken out of operation before 1 January 2010, and for decommissioning these facilities; (ii) future costs pertaining to
NPPs or fuel assembly manufacturing facilities that, after their operation has definitively ceased, had not been
anticipated during the operational stage; and (iii) any costs that might arise from the early shutdown of the facility
for reasons beyond the control of the licensee.
- A non-tax public charge relating to nuclear facilities still in operation. All costs incurred from 1 January 2010 in
connection with the management of radioactive waste and spent fuel generated at operating NPPs will be financed
by the NPP operators, regardless of the date on which the waste and fuel is produced, together with the costs of their
eventual decommissioning and dismantling. The amount payable by each NPP during the operation of the facility is
a charge on the electricity generated.
- A non-tax public charge relating to the manufacture of fuel elements at the Juzbado facility, intended to cover the
cost of the services provided in managing radioactive waste from fuel assembly manufacturing, including the
dismantling of fuel assembly manufacturing facilities. The amount is calculated as a rate applied to the amount of
nuclear fuel manufactured each year.
- A non-tax public charge relating to other facilities is intended to cover the management services for radioactive waste
generated at facilities other than those listed above, such as radioactive facilities (medicine, industry, agriculture and
research), Ciemat, and other companies. In each case, the costs are applied to the parties concerned at the time the
services are provided. The fee payable by the facilities is the result of multiplying the quantity or unit of waste
delivered for management by the tax rates.
The management of the Fund is entrusted to ENRESA and is governed by the principles of security, profitability and
liquidity.
SE
Radioactive waste and spent fuel management activities are financed through the following channels.
- The Nuclear Waste Fund ensures the financing of decommissioning activities for nuclear power programme
installations, as well as the management of associated radioactive waste and spent fuel, including disposal. Licence
holders pay a fee to the fund and are also required to provide guarantees in the event of premature facility closure or
to cover contingencies. If the fund’s resources are insufficient to cover costs, licence holders remain liable.
50
Financing mechanisms Comments
- Nuclear licensees, other than power reactor operators, are also required to pay fees to the Nuclear Waste Fund and
provide a financial guarantee to cover unpaid fees (the credit risk amount).
- Institutional radioactive waste generators are responsible for securing financial resources for the management of their
waste. In addition, there is a state financing scheme for the clean-up of orphan sources and other legacy waste that is
administered by Swedish Radiation Safety Authority.
51
5. Expertise, skills and R&D
5.1. Expertise and skills
All parties in Member States have ‘to make arrangements for education and training for their
staff, as well as research and development activities to cover the needs of the national
programme for radioactive waste and spent fuel management in order to obtain, maintain and
to further develop necessary expertise and skills’ (Article 8 of the Directive).
Implementation of Article 8 has shown further improvements in some Member States: nearly
all of them have set out national legal requirements for training and education of staff involved
in radioactive waste and spent fuel management. National schemes and arrangements for
education and training have remained largely unchanged and are summarised below:
• post-graduate courses at universities;
• training centres (basic and specialised, some at nuclear power plants);
• training programmes or plans (i.e. at national, facility or organisation level);
• regular self-assessments of staff and needs analysis;
• specialised, regular training for different levels of staff (e.g. on-the-job training with
experienced staff);
• specialised courses (e.g. for newcomers or experienced staff).
Some Member States reported improvements, such as the development of new training
programmes or the creation of training centres. However, other Member States still lack
detailed information on the implementation of their legal requirements. In addition, around one
fifth of Member States did not report any training and education activities for regulators or
licensees.
5.2. Research and development
Each Member State’s national programme must include ‘the research, development and
demonstration activities that are needed to implement solutions for the management of spent
fuel and radioactive waste’ (Article 12(1)(f) of the Directive).
In the fourth national reports, Member States provided very little information on their planned
research, development and demonstration activities. Research and development activities to
build national radioactive waste and spent fuel management expertise were reported by around
half the Member States. Only six Member States (mainly with large and medium nuclear
programmes) reported on the progress of their research and development
activities/programmes since the last reporting period. The other Member States did not report
any information or reported only in general terms.
52
Unsurprisingly, mainly those countries without a nuclear power programme have difficulties
in fulfilling the Directive’s research and development requirements. By contrast, Member
States with a nuclear power programme have, in general, more developed formal arrangements
for training and education, and advanced research and development activities. Member States,
particularly those without a nuclear power programme, have recognised that international
exchanges of experience through peer reviews, workshops, conferences and technical visits are
useful tools.
Most Member States with smaller nuclear programmes presented the research and development
activities and time frames for the final disposal of intermediate-level waste, high-level waste
and spent fuel in very general terms. Nearly half the Member States did not report any details
or confirmed that they had no specific research programme in place. Member States with only
disused radioactive sources in their inventories do not plan to develop specific research,
development and demonstration programmes. However, they rely on participating in or
following the results of international programmes or projects (e.g. through the IAEA and
European Commission) that are in line with their radioactive waste management needs.
Nevertheless, a few of these Member States, recognising the importance of research, plan to
conduct their own research, development and demonstration activities and to describe them in
future reviews of their national programmes.
Only a few Member States have put in place comprehensive research, development and
demonstration programmes that support implementation of their national programmes. Several
of these Member States regularly review and update their research programmes and are among
those that have made significant progress in developing deep geological disposal facilities.
These Member States typically carry out a national research programmes and actively
participate in international research initiatives, such as Euratom research programmes. In
addition, they participate, drive, and promote international cooperation and exchange forums
that have been established at European and international level. Member States with smaller
programmes also report participating in international research initiatives. Reporting is usually
limited to the list of international projects in which they take part. Member States are
encouraged to not only list international R&D projects in their national reports but also provide
information on the expected impact of those projects on the implementation of their national
programmes.
53
6. Transparency and public participation
National frameworks must include the national policy and process for transparency (Article 10
of the Directive). Member States have to ensure that the necessary information on the
management of radioactive waste spent fuel is made available to workers and the general public
(including information from the competent regulatory authority). They also must ensure that
the public is given the opportunity to participate effectively in the decision-making process for
radioactive waste and spent fuel management, in line with national legislation and international
obligations.
All Member States’ national programmes and reports contained information on the policy and
regulatory arrangements governing transparency and referred to the obligation to inform the
public as well as the consultation and participation mechanisms. Most Member States reported
no significant changes in these policy and regulatory arrangements. A few Member States
reported additional developments, improving their compliance with Article 10.
Information on activities related to radioactive waste and spent fuel management is publicly
available in all Member States. Mostly institutional websites are the primary source of
information; typically, information is found on the websites of the regulatory authorities and
waste management organisations. Key documents (including national programmes, national
reports, international evaluations, and annual reports) on strategies and their implementation
are usually public. Countries with nuclear power plants generally use a range of information
channels and techniques, that a broad audience can understand. Long-term decisions, such as
the siting and construction of geological repositories, are often accompanied by national
information campaigns.
Some Member States regularly provide information using other media or through information
or visitor centres. In a few cases, regular meetings with the general public were reported.
Several Member States reported that documents on licencing procedures for nuclear and
radioactive waste facilities are public and easily accessible on the authorities’ websites. In some
cases, every official record of the regulators activities is systematically published.
Several Member States provided descriptions or recent examples of how their transparency
policy is implemented in practice, especially effective participation practices. Member States
are encouraged to give more examples and descriptions of practical implementation of their
transparency policy.
Almost all Member States reported on consultation mechanisms set out in their national
frameworks. Public consultation is required for political decisions with environmental
implications, including those related to radioactive waste management. Consultations most
often take place as part of strategic environmental assessments, environmental impact
assessments or during the licencing of activities. In several countries, the adoption of new
legislation with an environmental impact is also subject to public consultation. Member States
are also encouraged to give more examples and descriptions of practical implementation of the
consultation mechanisms in place.
54
In several cases, national reports and national programmes either did not provide any
description of participation or only gave general explanations. The actual impact of public
participation on the decision-making process was usually not explained.
Overall, most Member States are well aware of the importance of public information and
participation relating to radioactive waste and spent fuel management and have ensured
compliance with Article 10 in their national frameworks.