| Dokumendiregister | Riigikogu |
| Viit | 1-2/26-805/1 |
| Registreeritud | 20.11.2026 |
| Sünkroonitud | 21.11.2026 |
| Liik | EL dokument |
| Funktsioon | |
| Sari | |
| Toimik | Ettepanek - COM(2026) 636 |
| Juurdepääsupiirang | Avalik |
| Adressaat | |
| Saabumis/saatmisviis | |
| Vastutaja | |
| Originaal | Ava uues aknas |
| Taotle dokumendi eemaldamist või parandamist |
EN EN
EUROPEAN COMMISSION
Brussels, 18.11.2026 COM(2026) 636 final
2026/0363 (COD)
Proposal for a
REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL
on the establishment of the Instrument for Coordinated Support to Ukraine for 2027
and amending Regulations (EU) 2024/792 and (EU) 2024/2773
EN 1 EN
EXPLANATORY MEMORANDUM
1. CONTEXT OF THE PROPOSAL
• Reasons for and objectives of the proposal
The EU is steadfast in its support to Ukraine, whose future lies within the EU. The EU
supports Ukraine’s independence, sovereignty and territorial integrity within its
internationally recognised borders and is unwavering in its commitment to provide political,
financial, economic, humanitarian, military and diplomatic support1. In light of the escalating
Russian aggression, it is necessary to act swiftly to ensure Ukraine has access to the resources
it urgently needs. This proposal is designed to ensure the establishment of a new instrument to
address those urgent needs, by providing Union assistance to Ukraine in the form of a loan to
be repaid by reparations due by Russia.
The large-scale invasion by Russia of Ukraine, which began on 24 February 2022, has had a
profoundly damaging impact on the country and its citizens. Despite diplomatic efforts by the
US and Europe to achieve a peaceful resolution, and Ukraine’s readiness to engage in
dialogue to end the war, Russia has intensified its attacks on Ukraine, deliberately targeting
civilians and critical infrastructures. This escalation has further exacerbated the humanitarian
crisis, caused immense suffering for the Ukrainian people and raised the colossal human and
financial cost of this unprovoked and unjustified military aggression. Russia’s illegal war of
aggression is a blatant violation of the territorial integrity, sovereignty and independence of
Ukraine, as well as a violation of the prohibition on the use of force enshrined in Article 2(4)
of the United Nations (UN) Charter, which is a peremptory rule of international law, and of
the other principles of the UN Charter. The unwavering determination and courage shown by
Ukrainians in defending their homeland is a testament to their strength and warrants deep
admiration and appreciation.
However, Russia’s intensified aggression has increased Ukraine’s financing needs and calls
for urgent investment in the Ukrainian Defence Technological and Industrial Base. It is now
clear that additional sources of funding both from the EU and the international community are
necessary. Ukraine’s financing needs for 2027 are set to surpass existing projections by the
International Monetary Fund (IMF), whose first review of the IMF Programme underlines
that risks and uncertainty remain exceptionally high. The IMF’s ability to continue this
programme is contingent upon receiving sufficient financing assurances from partners,
including the Union.
Ukraine’s recently assessed financing strategy for 2027, based on the draft 2027 State budget
that was developed in cooperation with the IMF, projects defence and security expenditure of
EUR 150.1 billion, supported by EUR 21.1 billion of in-kind military assistance and EUR
31.7 billion from the Ukraine Support Loan. Given the negative impact of the war on
Ukraine’s economy, that strategy projects that, in addition to the necessary in-kind assistance,
EUR 40.9 billion of international military aid is needed. Ukraine’s economy is already
vulnerable due to damage to key infrastructure, labour shortages, and the ongoing
displacement and mobilisation of people. It is further at risk of additional negative shocks due
to increasing attacks that may lead to increased expenditure needs and reduced tax revenues.
Swift financial assistance is vital to help Ukraine maintain essential state functions, ensure
macroeconomic stability, rehabilitate critical energy infrastructures, and invest into its
1 European Council Conclusions, 16 October 2026; EUCO 14/26.
EN 2 EN
Defence Technological and Industrial Base. These needs come on top of significant
requirements for medium-term recovery and reconstruction.
In its conclusions of 27 June 2024, 17 October 2024, 19 December 2024 and 23 October
2025, the European Council has stated that, subject to Union law, Russia’s assets should
remain immobilised until Russia ceases its war of aggression against Ukraine and
compensates it for the damage caused by this war. Additionally, Council Regulation (EU)
2025/26002 temporarily prohibits the transfer of assets or reserves of the Central Bank of
Russia until Russia ceases its war of aggression against Ukraine, Russia provides reparations
to Ukraine to the extent necessary to allow for reconstruction without adverse economic or
financial consequences for the Union, and Russia’s actions in the context of its war of
aggression against Ukraine have objectively ceased to pose a serious risk of severe difficulties
to the economy of the Union and its Member States.
Against this background, it is proposed to establish a new support instrument for Ukraine of
up to EUR 45 billion in loans guaranteed by the EU budget headroom, which Ukraine would
only repay once it receives reparations from Russia (the ‘Instrument for Coordinated Support
to Ukraine’). In order for the Union to work with like-minded partners in the implementation
of the Instrument for Coordinated Support to Ukraine to address Ukraine’s financing needs, it
is further proposed to (a) amend Regulation (EU) 2024/27733, which, inter alia, established
the Ukraine Loan Cooperation Mechanism to facilitate the implementation of the G7
‘Extraordinary Revenue Acceleration Loans for Ukraine’ initiative, to support G7 members in
providing new loans to Ukraine (‘second-generation ERA loans’) and (b) amend Regulation
(EU) 2024/792 establishing the Ukraine Facility4 to enable certain third-countries to provide
financial guarantees to the Union to allow the mobilisation of up to EUR 5 billion in
additional loans.
An Instrument for Coordinated Support to Ukraine
Ukraine’s debt to GDP ratio has drastically expanded since the start of the war, jumping from
less than 50% of GDP at end 2021 to 90% of GDP in 2026 (more than 135% of GDP
including ERA loans and Ukraine Support Loan financing). Given the significant destruction
that the war has had on productivity and the on-going drag that the war has on growth
dynamics, the significant financing needs of Ukraine are not possible to be addressed by
Ukraine taking on further debt.
At the same time, Member State’s finances are still recovering from a succession of crises
during the last decade, including the significant expenses generated by Russia’s war in
Ukraine and Russia’s hybrid campaign against the Union. The mobilisation of additional
significant resources by Member States to be able to finance Ukraine would constitute an
important economic challenge.
In this context of difficult debt dynamics of Ukraine due to the on-going Russian aggression
and the challenges associated with Member States finances, including as of Russia’s actions,
2 Council Regulation (EU) 2025/2600 of 12 December 2025 on emergency measures addressing the
serious economic difficulties caused by Russia’s actions in the context of the war of aggression against
Ukraine (OJ L, 2025/2600, 13.12.2025, ELI: http://data.europa.eu/eli/reg/2025/2600/oj). 3 Regulation (EU) 2024/2773 of the European Parliament and of the Council of 24 October 2024
establishing the Ukraine Loan Cooperation Mechanism and providing exceptional macro-financial
assistance to Ukraine (OJ L, 2024/2773, 28.10.2024, ELI: http://data.europa.eu/eli/reg/2024/2773/oj). 4 Regulation (EU) 2024/792 of the European Parliament and of the Council of 29 February 2024
establishing the Ukraine Facility (OJ L, 2024/792, 29.2.2024, ELI:
http://data.europa.eu/eli/reg/2024/792/oj).
EN 3 EN
it is appropriate to develop an innovative solution that is not expected to place a financial
burden on either Ukraine or Member States.
In line with the International Law Commission’s Draft Articles on the Responsibility of States
for Internationally Wrongful Acts (ARSIWA)5 and customary international law, Russia – as
the responsible state – is under an obligation to make full reparation for the injury caused by
its war of aggression against Ukraine. In particular, Articles 30 – 32 of ARSIWA provide that
“The State responsible for the internationally wrongful act is under an obligation: (a) to
cease that act, if it is continuing; [...]; “The responsible State is under an obligation to make
full reparation for the injury caused by the internationally wrongful act.” “Injury includes
any damage, whether material or moral, caused by the internationally wrongful act of a
State.”
In the context of this legal obligation on Russia to make reparations for the damage that it has
caused through its illegal war of aggression, it is appropriate for the Union to provide the
Instrument for Coordinated Support to Ukraine as a limited recourse loan that will become
due and payable when Ukraine receives from Russia cash or non-monetary assets as war
reparations, indemnities or any financial settlement from Russia, other than territory.
Use of funds
Given Ukraine’s financing needs and the considerable uncertainty on the future of the war, it
is critical that the Instrument for Coordinated Support to Ukraine is designed in a flexible
manner that is reactive to the situation. There should be flexibility to use the money towards
the most pressing financing needs, whether driven by the current war situation or also to
support reconstruction should peace prevail.
This proposal provides for a Instrument for Coordinated Support to Ukraine that will be
delivered in a predictable, continuous, orderly, flexible and timely manner with a view to
supporting Ukraine in covering its financing and defence needs in 2027, in particular those
resulting from Russia’s war of aggression. Specifically, the Instrument for Coordinated
Support to Ukraine should provide financial and economic assistance to Ukraine and ease its
external financing constraints, whether driven by war or by reconstruction, and support
Ukraine’s defence industrial capacities through economic, financial and technical cooperation.
To provide financial and economic assistance to Ukraine and ease its external financing
constraints, the proposal creates multiple options via which the funds can be channelled to
support Ukraine, where support would be able to be provided through macro-financial
assistance and through the Ukraine Facility. Under both instruments, disbursements will be
linked to preconditions and policy conditions. For macro-financial assistance, those
conditions would be set out in a memorandum of understanding (MoU) between the
Commission and Ukraine including conditions to strengthen revenue mobilisation, tackle root
causes of corruption, improving the sustainability and quality of public expenditure and
enhance the efficiency, transparency and accountability of the public finance management
systems. For the Ukraine Facility, the Ukraine Plan should be updated to reflect these
additional amounts, including measures to strengthen the rule of law and the fight against
corruption, measures to accelerate Ukraine’s accession to the Union and, where necessary,
measures to strengthen defence industrial cooperation and the integration of Ukraine’s
defense industrial capacities into the European Defence Technological and Industrial Base.
Regulation (EU) 2024/792 establishing the Ukraine Facility should therefore be amended
5 Articles on Responsibility of States for Internationally Wrongful Acts, 2001, International Law
Commission.
EN 4 EN
accordingly in order to allow for the budget assistance stemming from the Instrument for
Coordinated Support to Ukraine to be utilised through the Ukraine Facility.
To support Ukraine’s defence industrial capacities through economic, financial and technical
cooperation, the proposal provides for assistance that aims at enabling Ukraine to carry out
urgent and major public investments in support of the Ukrainian defence industry and its
integration into the European defence industry in response to and following the current crisis
situation. In order to urgently reinforce the Ukrainian defence industrial base in an efficient
and autonomous manner, eligibility criteria should be structured in a manner that directs the
activities, expenditures and measures to support Ukraine’s defence industrial capacities
towards the reconstruction, recovery and modernisation of the Ukrainian Defence
Technological and Industrial Base, taking into account its gradual future integration into the
European Defence Technological and Industrial Base. Furthermore, in order to allow Ukraine
to use the financial and economic assistance in the way that is the most adapted to the
circumstances, it is appropriate to allow it to employ the funds to support Ukraine’s defence
industrial capacities by different implementation methods that reflect the diversity of the
needs.
Amendment to Regulation (EU) 2024/2773
The G7 Leaders, in their Communiqué adopted on 14 June 2024 in Apulia, reaffirmed their
unwavering support for Ukraine and their strong commitment to helping Ukraine meet its
urgent short-term financing needs, as well as to supporting its long-term recovery and
reconstruction priorities. To that end, G7 Leaders agreed on 25 October 2024 on the
‘Extraordinary Revenue Acceleration Loans for Ukraine’ (‘ERA Loans’) initiative, in order to
make available approximately USD 50 billion in additional funding for Ukraine’s military,
budget and reconstruction needs. That financing is being serviced and repaid by flows of
extraordinary revenues stemming from the immobilisation of Russian sovereign assets held in
the Union and other relevant jurisdictions.
Regulation (EU) 2024/2773 established the Ukraine Loan Cooperation Mechanism and
provided exceptional macro-financial assistance to Ukraine. That Ukraine Loan Cooperation
Mechanism collects and distributes extraordinary revenues stemming from the immobilisation
of Russian sovereign assets held in the Union to support Ukraine in repaying ERA Loans, but
currently does not provide for what will happen to inflows into that Mechanism once all
initial ERA Loans are repaid.
To that end, Regulation (EU) 2024/2773 should be amended to support G7 members in
providing new loans to Ukraine (‘second-generation ERA loans’). Such new loans would be
repaid from future flows of extraordinary revenues stemming from the immobilisation of
Russian sovereign assets held in the Union and other relevant jurisdictions once the initially
supported loans have been repaid.
Amendment to Regulation (EU) 2024/792
To further address Ukraine’s financing needs, and to ensure maximum coordination and
consistency across international partners and donors, Regulation (EU) 2024/792 should be
amended to enable third countries of high credit quality to provide irrevocable, unconditional
and on-demand financial guarantees to the Union. These guarantees would allow the
mobilisation of up to EUR 5 billion in additional loans to Ukraine under Pillar I of the
Ukraine Facility, while limiting the risk for the Union budget. The Ukraine Plan should be
amended to reflect such additional budget assistance.
EN 5 EN
The guarantees should provide the Union with financial safeguards for this additional budget
assistance. To that end, Regulation (EU) 2024/792 should be amended to establish
provisioning for the additional loans. Considering the high credit quality of the third countries
that provide guarantees, the provisioning is supported by an appropriate contribution from the
guaranteeing third country.
• Consistency with existing policy provisions in the policy area
The support under the Instrument for Coordinated Support to Ukraine will be consistent with
and complementary to the support provided through Regulation (EU) 2026/4676, Regulation
(EU) 2024/792, Regulation (EU) 2021/9477, Regulation (EC) No 1257/968, Regulation (EC)
No 2024/2773 and Regulation (EU) 2025/11069, and is in line with the respective objectives,
intervention logic and rules of these instruments.
In particular, the Instrument for Coordinated Support to Ukraine comes in addition and is
complementary to the support provided by the EU under the Ukraine Support Loan and the
Ukraine Facility. Specific attention is paid to the consistency and mutual reinforcement of the
Instrument for Coordinated Support to Ukraine and the implementation of defence policies,
provided under the SAFE Regulation and Regulation (EU) 2025/264310 (‘EDIP Regulation’).
• Consistency with other Union Policies
The support under the Instrument for Coordinated Support to Ukraine initiative is consistent
with the application of restrictive measures (sanctions) against Russia and complementary to
the European Peace Facility.
Furthermore, the candidate status granted by the European Council on 23 June 2022 and the
decision of the 14-15 December 2023 European Council to open accession negotiations with
Ukraine anchors Ukraine firmly on its European path. For this reason, the whole EU response
in support of Ukraine’s resilience and recovery – including through the Instrument for
Coordinated Support to Ukraine, which will in turn be consistent with and supporting the
implementation of the Ukraine Facility – will also contribute to Ukraine’s accession process.
6 Regulation (EU) 2026/467 of the European Parliament and of the Council of 24 February 2026
implementing enhanced cooperation on the establishment of the Ukraine Support Loan for 2026 and
2027 (OJ L, 2026/467, 26.2.2026, ELI: http://data.europa.eu/eli/reg/2026/467/oj). 7 Regulation (EU) 2021/947 of the European Parliament and of the Council of 9 June 2021 establishing
the Neighbourhood, Development and International Cooperation Instrument – Global Europe,
amending and repealing Decision No 466/2014/EU of the European Parliament and of the Council and
repealing Regulation (EU) 2017/1601 of the European Parliament and of the Council and Council
Regulation (EC, Euratom) No 480/2009 (Text with EEA relevance) (OJ L 209, 14.6.2021, p. 1, ELI:
http://data.europa.eu/eli/reg/2021/947/2021-06-14). 8 Council Regulation (EC) No 1257/96 of 20 June 1996 concerning humanitarian aid (OJ L 163,
2.7.1996, p. 1, ELI: http://data.europa.eu/eli/reg/1996/1257/2019-07-26). 9 Council Regulation (EU) 2025/1106 of 27 May 2025 establishing the Security Action for Europe
(SAFE) through the Reinforcement of the European Defence Industry Instrument (OJ L, 2025/1106,
28.5.2025, ELI: http://data.europa.eu/eli/reg/2025/1106/oj). 10 Regulation (EU) 2025/2643 of the European Parliament and of the Council of 16 December 2025
establishing the European Defence Industry Programme and a framework of measures to ensure the
timely availability and supply of defence products (‘EDIP Regulation’) (Text with EEA relevance) (OJ
L, 2025/2643, 29.12.2025, ELI: http://data.europa.eu/eli/reg/2025/2643/oj).
EN 6 EN
2. LEGAL BASIS, SUBSIDIARITY AND PROPORTIONALITY
• Legal basis
Article 212 TFEU is an appropriate legal basis for financial assistance programmes granted by
the Union for third countries, which are not developing countries.
• Subsidiarity (for non-exclusive competence)
The subsidiarity principle is respected as the need for a common response in providing
support to Ukraine on adequate scale cannot be sufficiently achieved by the Member States
alone and, by reasons of its scale and effect, can be better achieved by the EU. The main
reasons are the fiscal capacity and budgetary constraints faced at the national level and the
need for strong donor coordination in order to maximise the scale and effectiveness of the
support, while limiting the burden on the administrative capacity of Ukrainian authorities,
which is very stretched in the current circumstances. The EU is in a unique position to deliver
external assistance to Ukraine to provide support in covering urgent budgetary needs in a
predictable, continuous, orderly and timely manner, including those linked to supporting
Ukraine’s defence industrial capacities.
• Proportionality
The continued unprovoked and unjustified military aggression by Russia requires granting
additional financial assistance to Ukraine in line with the objectives and modalities described
under this proposal.
The proposed financial support to Ukraine is considered adequate in size for 2027, based on
the elevated funding needs and best estimates of Ukraine’s defence needs submitted by the
national authorities, while taking into account the high uncertainty of the war circumstances.
Such support does not go beyond what is necessary for the sought purpose to provide
structured support to Ukraine and its related financing.
The proposal is proportionate to the scale and gravity of the addditional needs that have been
identified, including the need to provide budget support to Ukraine, and the need to carry out
urgent and major public investments in support of the Ukrainian Defence Technological and
Industrial Base and its integration into the European Defence Technological and Industrial
Base. The proposal respects the limits of possible Union intervention under the Treaties.
• Choice of the instrument
A Regulation of the European Parliament and of the Council is the appropriate instrument as
it provides directly applicable rules for the implementation of the Instrument for Coordinated
Support to Ukraine.
3. RESULTS OF EX-POST EVALUATIONS, STAKEHOLDER
CONSULTATIONS AND IMPACT ASSESSMENTS
• Ex-post evaluations/fitness checks of existing legislation
The proposal follows a series of macro-financial assistance operations provided to Ukraine
since 2015. Past ex-post evaluations of previous macro-financial assistance operations to
Ukraine have shown that in general they were highly relevant in terms of their objectives,
financial envelope and policy conditions. In particular, macro-financial assistance operations
proved crucial to support Ukraine in addressing its balance-of-payment problems and
implementing key structural reforms to stabilise the economy and enhance the sustainability
of its external position. They allowed for fiscal savings and financial benefits and acted as a
catalyst for additional financial support and investor confidence. The conditionality attached
EN 7 EN
to the macro-financial assistance operations was found complementary to the related IMF
programmes. It created a politically reinforcing effect that contributed to the mobilisation of
the Ukrainian authorities around essential reforms, especially in structural policy areas that
are less covered by other international donor programmes.
• Stakeholder consultations
In the preparation of this proposal, the Commission services have consulted with international
financial institutions and other bilateral (including Member States and G7 members) and
multilateral donors. The Commission is also in regular contact with the Ukrainian authorities.
Due to the urgency of preparing the proposal for timely adoption by the co-legislators and
ensuring its operational status by early 2027, a formal stakeholder consultation could not be
conducted. This approach aims to address the emerging and escalating defence and budgetary
demands resulting from Russia’s war of aggression. These needs encompass efforts related to
recovery and reconstruction. The European Union will ensure adequate communication and
visibility regarding the objectives and actions implemented under the scope of the Instrument
for Coordinated Support to Ukraine, both within Ukraine, across the Union, and
internationally.
• Collection and use of expertise
The proposal builds on decades long experience with macro-financial assistance as well as on
experience with the Union’s external action support, including the Ukraine Facility since 2024
and the Ukraine Support Loan since 2026.
The Commission based this proposal on a careful analysis, also building on inputs from
international financial institutions and other competent international institutions, of the
defence needs and broader macro-economic situation of Ukraine. This includes discussions on
a regular basis of the latest projections of Ukraine’s funding needs within international fora,
such as the G7 and the IMF, as well as continuous direct contact with the Ukrainian
authorities.
• Impact assessment
As for previous proposals designed to provide urgent assistance to a country at war, no impact
assessment is carried out. The ex-ante assessment of needs proposed to be covered by the
Instrument for Coordinated Support to Ukraine, inter alia, draws upon recent data from the
IMF and Ukrainian authorities. The support under the Instrument for Coordinated Support to
Ukraine builds on the lessons learned and achievements of recent support initiatives, such as
the G7 ERA Loans initiative and the Ukraine Support Loan.
• Regulatory fitness and simplification
The proposal is not linked to regulatory fitness and simplification.
• Fundamental rights
A precondition for granting support under the Instrument for Coordinated Support to Ukraine
is that Ukraine continues to uphold and respect effective democratic mechanisms and its
institutions, including a multi-party parliamentary system, and the rule of law, and to
guarantee respect for human rights, including those of persons belonging to minorities.
Upholding and respecting the rule of law should include the fight against corruption.
The reform-commitment and political will by the Ukrainian authorities is a positive sign, in
particular as evidenced by the European Council granting candidate status to Ukraine in June
2022 and the European Council decision of December 2023 to open accession negotiations
EN 8 EN
with Ukraine, by the renewed successful completion of the structural policy conditionality
attached to the recent macro-financial assistance operations to Ukraine and the continuing
implementation of the Ukraine Plan. On 14 May 2025, Ukraine adopted roadmaps on (among
others) the rule of law, public administration reform and on the functioning of democratic
institutions. Bilateral screening meetings were completed in September 2025. Since the
Russian aggression, the Ukrainian authorities have shown an impressive degree of resilience
and have remained committed to pursue these reforms in a transparent manner and working
towards EU standards and in line with the country’s path towards EU integration.
In view of this, the precondition for the Instrument for Coordinated Support to Ukraine is
considered to be met at present. Concurrently, the continuous adherence to this precondition
will be further ensured by specific conditions before disbursements. A similar precondition
for support is applicable to the implementation of the Ukraine Plan and the Ukraine Support
Loan.
4. BUDGETARY IMPLICATIONS
The Instrument for Coordinated Support to Ukraine will take the form of a limited recourse
loan to Ukraine of up to EUR 45 billion to be repaid by reparations due by Russia. The loan
will be based on EU borrowing on the capital markets backed by the EU budget headroom.
With a view to providing support to Ukraine on highly concessional basis, the Union may
decide to provide a subsidy for the costs in respect of funds borrowed in capital markets for
this loan to Ukraine. These costs are expected to start being invoiced as of the next
multiannual financial framework, starting in 2028, and should be financed over and above the
MFF ceilings through a dedicated special instrument.
Details on the budgetary implications are provided in the Legislative Financial Statement
attached to this proposal.
5. OTHER ELEMENTS
• Implementation plans and monitoring, evaluation and reporting arrangements
The Instrument for Coordinated Support to Ukraine will be for a maximum amount of EUR
45 billion.
To receive financial and economic assistance under the Instrument for Coordinated Support to
Ukraine, Ukraine will submit to the Commission a duly justified request for funds, which may
be submitted by Ukraine to the Commission, in principle, six times a year.
Furthermore, the Commission will submit to the European Parliament and to the Council a
report on the implementation of the Instrument for Coordinated Support to Ukraine
Regulation in the preceding year, which will include an evaluation of that implementation.
Additionally, by 30 June 2029, the Commission will submit to the European Parliament and
to the Council an evaluation report, assessing the results and efficiency of the Instrument for
Coordinated Support to Ukraine provided under the Instrument for Coordinated Support to
Ukraine Regulation and the extent to which it has contributed to the aims of the assistance.
Finally, in order to enhance the dialogue between the Union institutions, in particular the
European Parliament, the Council and the Commission, and to ensure greater transparency
and accountability, the competent committee of the European Parliament may invite the
Commission to discuss the implementation of this Regulation.
• Detailed explanation of the specific provisions of the proposal
Chapter I of the Regulation concerns its general provisions.
EN 9 EN
Article 1 provides the subject matter of the Regulation, which is the establishment of the
Instrument for Coordinated Support to Ukraine.
Article 2 defines the general and specific objectives of the Instrument for Coordinated
Support to Ukraine, which are to provide financial and economic assistance to Ukraine in a
predictable, continuous manner, through supporting Ukraine’s macro-financial stability and
defence industrial capacities.
Article 3 provides the definitions applicable under the Regulation.
Article 4 sets the available assistance under the Instrument for Coordinated Support to
Ukraine.
Article 5 prescribes the preconditions for assistance under the Instrument for Coordinated
Support to Ukraine.
Article 6 provides for the close cooperation between the Commission, Ukraine, Member
States, relevant international bodies and donors to Ukraine to ensure a coherent and consistent
approach to address Ukraine’s financial and economic assistance needs.
Chapter II of the Regulation concerns the Macro-Financial Assistance.
Article 7 provides for the purpose of macro-financial assistance, notably to contribute to
covering Ukraine’s financing gap as identified in a positively assessed Ukrainian Financing
Strategy.
Article 8 sets out that the Commission shall agree with Ukraine on the policy conditions to
which the support is to be linked, which shall be described in a memorandum of
understanding.
Chapter III of the Regulation concerns assistance to support Ukraine’s Defence Industrial
Capacities.
Article 9 provides for the purpose of the assistance to support Ukraine’s defence industrial
capacities, notably to carry out urgent and major public investments in support of the
Ukrainian defence industry and its integration into the European defence industry.
Article 10 defines the eligibility conditions for the activities, expenditures and measures to
support Ukraine’s defence industrial capacities.
Article 11 requires Ukraine to produce a schedule for each activity, expenditure or measure
related to a defence product or other product for defence purposes for which it intends to
request assistance.
Article 12 prescribes the establishment of the Ukraine’s Defence Industrial Capacities Expert
Group.
Article 13 provides for the opening of special accounts for the sole purpose of the
management of the financial and economic assistance received by Ukraine to support its
defence industrial capacities.
Article 14 sets out the monitoring requirements for the assistance provided to support
Ukraine’s defence industrial capacities.
Article 15 defines the conditions for the modification of an existing framework agreement or
contract for defence products.
Article 16 allows for Member States, for the sole purpose of the Regulation, to request an
economic operator on its territory, to prioritise certain order of defence products.
EN 10 EN
Chapter IV of the Regulation concerns the financing and implementation of the Instrument for
Coordinated Support to Ukraine.
Article 17 stipulates that the detailed financial terms of the Instrument for Coordinated
Support to Ukraine shall be laid down in the Instrument for Coordinated Support to Ukraine
Agreement and sets out certain mandatory requirements.
Article 18 sets out that in order for Ukraine to receive financial and economic assistance, it
shall submit to the Commission a duly justified request for funds.
Article 19 provides for a borrowing cost subsidy for the Instrument for Coordinated Support
to Ukraine.
Article 20 prescribes the requirements on the Commission for making a decision to release an
instalment under the Instrument for Coordinated Support to Ukraine.
Article 21 empowers the Commission to borrow the necessary funds, on behalf of the Union,
to finance the Instrument for Coordinated Support to Ukraine.
Article 22 lays out the rules on classified information and sensitive information.
Chapter V concerns final provisions.
Article 23 empowers the Commission to adopt delegated acts, subject to conditions.
Article 24 regulates the governance through committee procedures.
Article 25 provides for a Instrument for Coordinated Support to Ukraine dialogue, which
foresees to enhance communication between the Union institutions, in particular the European
Parliament, the Council and the Commission.
Article 26 prescribes the provision of information to the European Parliament and to the
Council.
Article 27 provides for the necessary amendments to Regulation (EU) 2024/792.
Article 28 provides for the necessary amendments to Regulation (EU) 2024/2773.
Article 29 regulates the entry into force.
EN 1 EN
2026/0363 (COD)
Proposal for a
REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL
on the establishment of the Instrument for Coordinated Support to Ukraine for 2027
and amending Regulations (EU) 2024/792 and (EU) 2024/2773
THE EUROPEAN PARLIAMENT AND THE COUNCIL OF THE EUROPEAN UNION,
Having regard to the Treaty on the Functioning of the European Union, and in particular
Article 212 thereof,
Having regard to the proposal from the Commission,
After transmission of the draft legislative act to the national parliaments,
Acting in accordance with the ordinary legislative procedure,
Whereas:
(1) On 24 February 2022, the President of the Russian Federation announced a ‘special
military operation’ in Ukraine, and Russia’s armed forces began an unprovoked and
unjustified war of aggression against Ukraine. That illegal war of aggression is a
blatant violation of the territorial integrity, sovereignty and independence of Ukraine,
as well as a violation of the prohibition on the use of force enshrined in Article 2(4) of
the United Nations Charter, which is a peremptory rule of international law, and of the
other principles of the United Nations Charter.
(2) Since the beginning of Russia’s unprovoked and unjustified war of aggression against
Ukraine, the Union, its Member States and European financial institutions have
mobilised unprecedented support for Ukraine’s economic, social, financial and
defence resilience. That support combines support from the Union budget, including
exceptional macro-financial assistance and support from the European Investment
Bank and the European Bank for Reconstruction and Development, fully or partially
guaranteed by the Union budget, as well as further financial support from Member
States.
(3) Decision (EU) 2022/31311, Decision (EU) 2022/120112, Decision (EU) 2022/162813
and Regulation (EU) 2022/246314 of the European Parliament and the Council
11 Decision (EU) 2022/313 of the European Parliament and of the Council of 24 February 2022 providing
macro-financial assistance to Ukraine (OJ L 55, 28.2.2022, p. 4, ELI:
http://data.europa.eu/eli/dec/2022/313/oj). 12 Decision (EU) 2022/1201 of the European Parliament and of the Council of 12 July 2022 providing
exceptional macro-financial assistance to Ukraine (OJ L 186, 13.7.2022, p. 1, ELI:
http://data.europa.eu/eli/dec/2022/1201/oj). 13 Decision (EU) 2022/1628 of the European Parliament and of the Council of 20 September 2022
providing exceptional macro-financial assistance to Ukraine, reinforcing the common provisioning fund
by guarantees by Member States and by specific provisioning for some financial liabilities related to
Ukraine guaranteed under Decision No 466/2014/EU, and amending Decision (EU) 2022/1201 (OJ
L 245, 22.9.2022, p. 1, ELI: http://data.europa.eu/eli/dec/2022/1628/oj).
EN 2 EN
collectively made available EUR 25 200 000 000 of macro-financial assistance to
Ukraine throughout 2022 and 2023. That support constituted a major contributing
factor to Ukraine’s macroeconomic and financial resilience at a critical time.
(4) Regulation (EU) 2024/792 of the European Parliament and of the Council15
established the Ukraine Facility as an exceptional medium-term instrument that brings
together the bilateral support provided by the Union to Ukraine, ensuring coordination
and efficiency (the ‘Ukraine Facility’). Over the period from 2024 to 2027, the
Ukraine Facility helps to address Ukraine’s financing needs and contributes to its
recovery, reconstruction and modernisation needs, while at the same time supporting
Ukraine’s reform effort as part of its path towards accession to the Union.
(5) Regulation (EU) 2024/2773 of the European Parliament and the Council16 established
the Ukraine Loan Cooperation Mechanism and provided exceptional macro-financial
assistance to Ukraine. That assistance was the Union’s contribution as part of the G7
‘Extraordinary Revenue Acceleration Loans for Ukraine’ (‘ERA Loans’) initiative,
which collectively assisted in addressing Ukraine’s financing gap for 2025.
(6) Regulation (EU) 2026/467 of the European Parliament and of the Council17
established the Ukraine Support Loan to provide financial and economic assistance to
Ukraine in a predictable, continuous, orderly, flexible and timely manner with a view
to supporting Ukraine in covering its financing needs resulting particularly from
Russia’s war of aggression against Ukraine and Russia’s non-payment of reparations
due (the ‘Ukraine Support Loan’). Over 2026 and 2027, the Ukraine Support Loan
provides up to EUR 90 000 000 000 to support macro-financial stability via the easing
of Ukraine’s external and internal financing constraints and to support Ukraine’s
defence industrial capacities through economic, financial and technical cooperation.
(7) Russia’s war of aggression against Ukraine has caused tremendous damage in
Ukraine, with estimated recovery and reconstruction costs of EUR 530 000 000 000 as
of 31 December 2025. Moreover, Ukraine has lost access to international financial
markets and experienced a significant drop in public revenue, while public expenditure
has increased substantially. Against that background, it can be envisaged that Ukraine
will have substantive funding needs in the coming years.
(8) On 26 February 2026, the International Monetary Fund (IMF) approved a new
programme for Ukraine to cover additional financing needs from 2026 to 2029. The
IMF’s ability to continue the new programme is contingent upon receiving sufficient
financing assurances from other partners, including the Union.
(9) Despite ongoing international efforts to broker a peaceful resolution to the conflict, the
prolongation of Russia’s war of aggression against Ukraine has resulted in significant
14 Regulation (EU) 2022/2463 of the European Parliament and of the Council of 14 December 2022
establishing an instrument for providing support to Ukraine for 2023 (macro-financial assistance +) (OJ
L 322, 16.12.2022, p. 1, ELI: http://data.europa.eu/eli/reg/2022/2463/oj). 15 Regulation (EU) 2024/792 of the European Parliament and of the Council of 29 February 2024
establishing the Ukraine Facility (OJ L, 2024/792, 29.2.2024,
ELI: http://data.europa.eu/eli/reg/2024/792/oj). 16 Regulation (EU) 2024/2773 of the European Parliament and of the Council of 24 October 2024
establishing the Ukraine Loan Cooperation Mechanism and providing exceptional macro-financial
assistance to Ukraine (OJ L, 2024/2773, 28.10.2024, ELI: http://data.europa.eu/eli/reg/2024/2773/oj). 17 Regulation (EU) 2026/467 of the European Parliament and of the Council of 24 February 2026
implementing enhanced cooperation on the establishment of the Ukraine Support Loan for 2026 and
2027 (OJ L, 2026/467, 26.2.2026, ELI: http://data.europa.eu/eli/reg/2026/467/oj).
EN 3 EN
damage to Ukraine’s critical defence, civilian and energy infrastructure, necessitating
the mobilisation of substantial additional resources to address Ukraine’s immediate
financing needs.
(10) Russia’s war of aggression against Ukraine represents a strategic geopolitical threat to
the Union as a whole and requires Member States to stand strong and united. It is
therefore essential for Union support to be deployed rapidly and to be able to adapt
flexibly for immediate relief and short-term rehabilitation on the way to future
reconstruction.
(11) In line with the Articles on the Responsibility of States for Internationally Wrongful
Acts, adopted in 2001 by the United Nations’ International Law Commission at its
fifty-third session, and taken note of by the United Nations General Assembly in
Resolution 56/83, and customary international law, Russia – as the responsible state –
is under an obligation to make full reparation for the injury caused by its war of
aggression against Ukraine.
(12) Council Decision (CFSP) 2022/33518 and Council Regulation (EU) 2022/33419
prohibit transactions related to the management of reserves as well as of assets of the
Central Bank of Russia, including transactions with any legal person, entity or body
acting on behalf of, or at the direction of, the Central Bank of Russia. In its
conclusions of 27 June 2024, 17 October 2024 and 19 December 2024, the European
Council has stated that, subject to Union law, Russia’s assets should remain
immobilised until Russia ceases its war of aggression against Ukraine and
compensates it for the damage caused by that war.
(13) In addition, Council Regulation (EU) 2025/260020 prohibits the transfer of assets or
reserves of the Central Bank of Russia on a temporary basis until Russia ceases its war
of aggression against Ukraine, Russia provides reparations to Ukraine to the extent
necessary to allow for reconstruction without adverse economic or financial
consequences for the Union and Russia’s actions in the context of its war of
aggression against Ukraine have objectively ceased to pose a serious risk of severe
difficulties to the economy of the Union and its Member States.
(14) In its conclusions of 19 June 2026 and 16 October 2026, the European Council stated
that the Union will continue to provide, in coordination with like-minded partners and
allies, comprehensive political, financial, economic, humanitarian, military and
diplomatic support to Ukraine and its people. Furthermore, in those conclusions of 16
October 2026, the European Council stated that it remains committed to addressing
Ukraine’s pressing financing needs, together with international partners.
(15) Given the financing position of Ukraine, the critical need for Ukraine to have the
resources to counter Russia’s aggression and, where possible, to reconstruct, it is
appropriate that the Union provide additional support to address Ukraine’s urgent
18 Council Decision (CFSP) 2022/335 of 28 February 2022 amending Decision 2014/512/CFSP
concerning restrictive measures in view of Russia’s actions destabilising the situation in Ukraine (OJ
L 57, 28.2.2022, p. 4, ELI: http://data.europa.eu/eli/dec/2022/335/oj). 19 Council Regulation (EU) 2022/334 of 28 February 2022 amending Council Regulation (EU)
No 833/2014 concerning restrictive measures in view of Russia’s actions destabilising the situation in
Ukraine (OJ L 57, 28.2.2022, p. 1, ELI: http://data.europa.eu/eli/reg/2022/334/oj). 20 Council Regulation (EU) 2025/2600 of 12 December 2025 on emergency measures addressing the
serious economic difficulties caused by Russia’s actions in the context of the war of aggression against
Ukraine (OJ L, 2025/2600, 13.12.2025, ELI: http://data.europa.eu/eli/reg/2025/2600/oj).
EN 4 EN
financing requirements and facilitate the implementation of the IMF programme. To
that end, it is appropriate to establish an instrument for providing Union support to
Ukraine in 2027 in the form of a loan to be repaid by reparations due by Russia (the
‘Instrument for Coordinated Support to Ukraine’).
(16) The Instrument for Coordinated Support to Ukraine should provide financial
assistance to Ukraine in a predictable, continuous, orderly, flexible and timely manner
with a view to supporting Ukraine in covering its financing and defence needs, in
particular those resulting from Russia’s war of aggression against Ukraine.
Specifically, the Instrument for Coordinated Support to Ukraine should support
macro-financial stability in Ukraine and ease its external financing and support
Ukraine’s defence industrial capacities through economic, financial and technical
cooperation, thereby contributing to providing Ukraine a qualitative military edge.
(17) The Instrument for Coordinated Support to Ukraine should, subject to conditions,
provide support to Ukraine in the form of a loan of up to EUR 45 000 000 000. In
view of the principle of sound financial management, the Instrument for Coordinated
Support to Ukraine should be made available by the Commission to Ukraine in
instalments, which may be disbursed in one or more tranches.
(18) The support to Ukraine under the Instrument for Coordinated Support to Ukraine
should be made available under the precondition that Ukraine continues to uphold and
respect effective democratic mechanisms, including a multi-party parliamentary
system and the rule of law, and to guarantee respect for human rights, including those
of persons belonging to minorities. Upholding and respecting the rule of law should
include the fight against corruption.
(19) Given the significant scale of Ukraine’s needs for both budget assistance and
assistance for defence industrial capacities, as well as the constraints that some
external partners have on the provision of their support, it is appropriate to establish an
indicative allocation of the Instrument for Coordinated Support to Ukraine between
those two financing needs. Whilst ensuring that Ukraine’s financing needs as
calculated by the IMF for 2027 are fully addressed, that distribution should be
indicative in order to reflect changing circumstances that may have an impact on
Ukraine’s financing needs and to ensure that those needs continue to be addressed in a
predictable, continuous, orderly, flexible and timely manner.
(20) Financial and economic assistance in the form of budget assistance should be made
available with a view to supporting Ukraine in covering its financing needs. The
financial and economic assistance under this Regulation should provide important
input into Ukraine’s post-war economic recovery, long-term growth and prosperity all
of which will have an important role to play in a future peace agreement. To ensure
flexibility in addressing those needs, it is appropriate to use multiple means of
delivery, where support should be able to be provided through macro-financial
assistance and through a loan to be implemented pursuant to Chapter III of Regulation
(EU) 2024/792.
(21) The Ukraine Facility is a medium-term instrument that has the objective to support
Ukraine’s recovery and reconstruction, gradual integration into the internal market, as
well as, inter alia, the adoption and implementation of the political, institutional, legal,
administrative, social and economic reforms required to align to Union values and to
progressively align to Union rules, standards, policies and practices (the ‘acquis’) with
a view to future Union membership, thereby contributing to mutual stability, security,
peace, prosperity and sustainability. It is therefore appropriate to provide for amounts
EN 5 EN
stemming from the Instrument for Coordinated Support to Ukraine to be utilised
through the Ukraine Facility. Regulation (EU) 2024/792 should therefore be amended
accordingly. Chapter III of Regulation (EU) 2024/792 provides for financing to
Ukraine upon satisfactory fulfilment of the conditions laid down in the Ukraine Plan,
which sets out the reform and investment agenda of Ukraine. The Ukraine Plan should
be updated to reflect that additional budget assistance, including measures to
strengthen the rule of law and the fight against corruption, measures to accelerate
Ukraine’s accession to the Union and, where necessary, measures to strengthen
defence industrial cooperation and the integration of Ukraine’s defense industrial
capacities into the European Defence Technological and Industrial Base.
(22) Macro-financial assistance should be linked to policy conditions to be set out in a
Memorandum of Understanding (MoU). The MoU should include robust and
ambitious reform commitments by Ukraine, including those to strengthen revenue
mobilisation to support Ukraine’s financing needs and tackle the root causes of
corruption in public finances, including via improving the sustainability and quality of
public expenditure and enhancing the efficiency, transparency and accountability of
the public finance management systems. It should be possible for such macro-financial
assistance to be used by Ukraine to assist in the financing of compensation, as a form
of reparation, to those individuals who have suffered damage from the illegal actions
of Russia, including through the Claims Commission for Ukraine established under the
auspices of the Council of Europe. In view of the principle of sound financial
management and to facilitate the Ukrainian authorities’ liquidity management and
ensure predictability, there should, in principle, be a maximum of four instalments of
that macro-financial assistance.
(23) In order to ensure uniform conditions for the implementation of this Regulation, and
for reasons of efficiency, the Commission should be empowered to negotiate
conditions for the macro-financial assistance with the Ukrainian authorities under the
supervision of the committee of representatives of the Member States (the
‘committee’) in accordance with Regulation (EU) No 182/2011 of the European
Parliament and of the Council21. Considering the potentially significant impact of
assistance, it is appropriate that the examination procedure as specified in Regulation
(EU) No 182/2011 be used. Taking into consideration the amount of the Instrument for
Coordinated Support to Ukraine, the examination procedure should apply to the
adoption of the MoU and to any reduction or cancellation of the Instrument for
Coordinated Support to Ukraine.
(24) The Instrument for Coordinated Support to Ukraine should provide financial and
economic assistance to Ukraine as a country at war, the financial stability of which is
intrinsically linked to and depends on its ability to defend itself against Russia’s
aggression. That justifies a specific amount of the financial and economic assistance to
Ukraine being used to increase Ukraine’s capacity to cope with budgetary needs in
relation to the capacity of Ukraine to strengthen its defence and military capabilities,
thereby contributing to providing Ukraine with a qualitative military edge. That
financial and economic assistance should aim to enable Ukraine to carry out urgent
and major public investments in support of the Ukrainian defence industry and to
21 Regulation (EU) No 182/2011 of the European Parliament and of the Council of 16 February 2011
laying down the rules and general principles concerning mechanisms for control by the Member States
of the Commission’s exercise of implementing powers (OJ L 55, 28.2.2011, p. 13, ELI:
http://data.europa.eu/eli/reg/2011/182/oj).
EN 6 EN
facilitate its integration into the European defence industry in response to and
following the current crisis situation. That financial and economic assistance should
contribute, in particular, to the reconstruction, recovery and modernisation of the
Ukrainian Defence Technological and Industrial Base, with a view to increasing its
defence industrial readiness, taking into account its gradual future integration into the
European Defence Technological and Industrial Base as well as the objectives and
measures included in the Letter of Intent on a strategic defence industrial partnership
between the European Commission and Ukraine of 15 July 2026 and through support
for the timely availability of defence products and other products for defence
purposes, through cooperation between the Union and Ukraine.
(25) Financial and economic assistance to support Ukraine’s defence industrial capacities
should be made available for activities, expenditures and measures related to defence
products or other products for defence purposes that meet certain eligibility criteria. In
order to urgently reinforce the Ukrainian Defence Technological and Industrial Base
in an efficient and autonomous manner, those eligibility criteria should be structured
in a manner that directs the activities, expenditures and measures to support Ukraine’s
defence industrial capacities towards the reconstruction, recovery and modernisation
of the Ukrainian Defence Technological and Industrial Base, taking into account its
gradual future integration into the European Defence Technological and Industrial
Base. In that context, when examining whether manufacturers are controlled by third
countries or third-country entities, control should be understood as the ability to
exercise a decisive influence over a legal entity, directly or indirectly, through one or
more intermediate legal entities.
(26) In order to allow Ukraine to use the financial and economic assistance in a way that is
the most adapted to the circumstances, it is appropriate to allow it to employ the funds
to support Ukraine’s defence industrial capacities by different implementation
methods that reflect the diversity of the needs. The funds may also contribute to the
Ukraine Support Instrument established by Regulation (EU) 2025/2643 of the
European Parliament and of the Council22, the Ukraine Investment Framework
established by Regulation (EU) 2024/792 for dual-use goods or other Union
programmes. Moreover, the funds should allow Ukraine to engage in a massive
intervention in the demand for defence products in order to create suitable conditions
to incentivise massive investments in the ramp up of the production capacity and in the
development of new products. For that purpose, Ukraine should be allowed to use the
funds to launch massive procurements of defence products made from the Ukrainian
Defence Technological and Industrial Base and the European Defence Technological
and Industrial Base via procurements under the Security Action for Europe Instrument
(the ‘SAFE instrument’) established by Council Regulation (EU) 2025/110623 or,
subject to validations, under other implementation methods.
(27) For certain defence products whose underlying technologies are not widely available
in the Union and which may be difficult to substitute at a large scale, such as air and
22 Regulation (EU) 2025/2643 of the European Parliament and of the Council of 16 December 2025
establishing the European Defence Industry Programme and a framework of measures to ensure the
timely availability and supply of defence products (‘EDIP Regulation’) (OJ L, 2025/2643, 29.12.2025,
ELI: http://data.europa.eu/eli/reg/2025/2643/oj). 23 Council Regulation (EU) 2025/1106 of 27 May 2025 establishing the Security Action for Europe
(SAFE) through the Reinforcement of the European Defence Industry Instrument (OJ L, 2025/1106,
28.5.2025, ELI: http://data.europa.eu/eli/reg/2025/1106/oj).
EN 7 EN
missile defence systems and strategic enablers, additional conditions should be
required in order to ensure that Ukraine’s armed forces have freedom related to those
products without limitations imposed by third countries. Therefore, for such defence
products, the manufacturer should have the ability to decide, without any restriction
being imposed by third countries or third-country entities, on the definition, adaptation
or evolution of the design of the defence products procured, including the legal
authority to substitute or remove those components that are subject to restrictions
imposed by third countries or by third-country entities.
(28) To ensure the smooth implementation of this Regulation in conjunction with the SAFE
instrument, it is appropriate to apply similar eligibility conditions. The SAFE
instrument supports the procurement of defence products as identified in Regulation
(EU) 2025/1106. The list of products being part of Categories 1 and 2 has been agreed
by the Council, and that list has proven to be comprehensive enough to allow support
for the procurement of products needed by Member States, including air platforms.
Given the constantly evolving situation on the battlefield, it is essential to avoid that
the existence of a list of products that can be supported constrains Ukraine in getting
the assistance it needs. Taking into account the fact that Ukraine is a country at war
whose capacity to defend its territory might depend on the availability of a given
product in the very short term, Ukraine should be allowed to procure products which
do not comply with those eligibility conditions where either no equivalent product is
available by procurement or where there is an urgent need for the delivery of a
product. That may include but is not limited to air and missile defence systems,
including interceptors, and fighter aircraft ammunition and spare parts and deep-strike
capabilities. For any derogation, the time for delivery of the product should be
commensurate with the urgency of the situation and Ukraine’s immediate operational
needs. To that end, Ukraine should provide to the Commission the information
reasonably available to it to demonstrate that a derogation is necessary, because whilst
the war is ongoing, and Ukraine’s needs are as such urgent, Ukraine should not be
required to undertake extensive market research. In order to ensure uniform conditions
for the implementation of this Regulation, and for reasons of efficiency, the
Commission should be empowered to examine such requests for derogations under the
supervision of the committee in accordance with Regulation (EU) No 182/2011.
Considering the potentially significant impact of the assistance, it is appropriate that
the examination procedure as specified in Regulation (EU) No 182/2011 be used. Due
to the exceptional situation caused by Russia’s war of aggression against Ukraine and
the necessity for the timely availability of defence products, it is appropriate that the
duly justified case referred to in Article 3(3) of Regulation (EU) No 182/2011 be
invoked to allow for an opinion of the committee within a time limit which the chair of
the committee may lay down according to the urgency of the matter. Where necessary,
the written procedure referred to in Article 3(5) of that Regulation should be used.
(29) To allow third countries to contribute to the assistance to Ukraine while at the same
time safeguarding the Union’s and Member States’ security and defence interests and
taking into account the existing agreements under the SAFE instrument, it is
appropriate to provide for the possibility to extend the eligibility criteria to third
countries other than Ukraine and EEA EFTA States that do not contravene the security
and defence interests of the Union and its Member States, provided that those third
countries have concluded an agreement with the Union in accordance with Article 17
of Regulation (EU) 2025/1106 or, where they have not concluded such an agreement,
provided that such countries have entered into a Security and Defence Partnership with
the Union, are providing significant financial and military support to Ukraine, and are
EN 8 EN
providing a fair and proportionate financial contribution, respecting the principle that
any agreement with a third country must be based on a balance of rights and
obligations and a third country should not have the same rights nor enjoy the same
benefits as a Member State. Such a possibility, therefore, should be limited to specific
defence products taking into account the immediate operational needs of Ukraine,
focusing, in particular, on air and missile defence systems, ammunition and missiles,
drones and related anti-drone systems, artillery systems, including deep precision
strike capabilities, strategic enablers such as, but not limited to, strategic airlift, air-to-
air refuelling, C4ISTAR systems as well as space assets and services.
(30) As regards third countries that have concluded an agreement with the Union in
accordance with Article 17 of Regulation (EU) 2025/1106, the Commission should be
empowered to adopt delegated acts in accordance with Article 290 of the Treaty on the
Functioning of the European Union (TFEU) to supplement this Regulation. It is of
particular importance that the Commission carry out appropriate consultations during
its preparatory work, including at expert level, and that those consultations be
conducted in accordance with the principles laid down in the Interinstitutional
Agreement of 13 April 2016 on Better Law-Making24. In particular, to ensure equal
participation in the preparation of delegated acts, the European Parliament and the
Council receive all documents at the same time as Member States’ experts, and their
experts systematically have access to meetings of Commission expert groups dealing
with the preparation of delegated acts.
(31) In view of the importance of the financial effects of the measures imposed and to
ensure the consistency between the different areas of Union external action,
implementing powers should be conferred on the Council which should act on the
basis of a Commission proposal regarding the possibility to extend the eligibility rules
to third countries that have not concluded an agreement with the Union in accordance
with Article 17 of Regulation (EU) 2025/1106. The Council should act by means of an
implementing decision, which it should endeavour to adopt without undue delay. That
implementing decision should determine, in respect of each third country, which
defence products are to be made accessible to Ukraine, taking into account the amount
of the financial contribution made by the third country in question and the degree of
financial and military support to Ukraine.
(32) This Regulation is without prejudice to applicable international law prohibiting the
use, development or production of certain defence products and technologies.
(33) The implementation of the assistance to support Ukraine’s defence industrial
capacities should be carried out in line with the principles of sound financial
management ensuring the protection of the financial interests of the Union as set out in
Article 223(4) of Regulation (EU, Euratom) 2024/2509 of the European Parliament
and the Council25. Detailed requirements in this respect might be entered into in an
arrangement to be signed between the Commission and Ukraine. Furthermore, for the
management of the financial and economic assistance received to support Ukraine’s
defence industrial capacities, Ukraine should open accounts via which to manage that
assistance, and the Commission should be able to monitor those accounts.
24 OJ L 123, 12.5.2016, p. 1, ELI: http://data.europa.eu/eli/agree_interinstit/2016/512/oj. 25 Regulation (EU, Euratom) 2024/2509 of the European Parliament and of the Council of 23 September
2024 on the financial rules applicable to the general budget of the Union (OJ L, 2024/2509, 26.9.2024,
ELI: http://data.europa.eu/eli/reg/2024/2509/oj).
EN 9 EN
(34) To support the implementation of assistance to support Ukraine’s defence industrial
capacities, the Commission should establish the Ukraine’s Defence Industrial
Capacities Expert Group. That Expert Group should advise the Commission on
matters related to the assistance to support Ukraine’s defence industrial capacities.
(35) The Commission should monitor the implementation of assistance to support
Ukraine’s defence industrial capacities, including particularly the delivery of products.
To that end, various monitoring arrangements should be established to reflect the
different methods of implementation. Should the Commission be notified by Ukraine
of the non-implementation of a contract or agreement or become aware of the non-
delivery of products or the non-use of funds in the accounts in which the assistance is
managed, the Commission should engage with Ukraine to repurpose those funds in
accordance with this Regulation, including where necessary after the availability
period for the loan.
(36) Directive 2009/81/EC of the European Parliament and of the Council26 concerns,
amongst other things, the establishment of an appropriate legislative framework on the
coordination of procurement procedures for the award of contracts to meet the security
requirements of Member States and the obligations arising from the TFEU. To achieve
that aim, Directive 2009/81/EC caters, in particular, for addressing crisis situations,
particularly by providing specific provisions applicable in cases of urgency resulting
from a crisis, such as shortening periods for the receipt of tenders and the possibility to
use the negotiated procedure without prior publication of a contract notice. However,
in certain cases of urgency, those rules might be insufficient, especially where the
urgency resulting from the crisis can be addressed only by having Ukraine and at least
one Member State engaging in a common procurement. In those cases, often the only
solution that ensures the security interests of those countries is to open an existing
framework agreement or contract of a Member State to contracting authorities of
Ukraine, even where Ukraine was not originally party to it and even though that
possibility had not been provided for in the original framework agreement or contract.
As those possibilities are not foreseen in Directive 2009/81/EC at the time of the entry
into force of this Regulation, this Regulation provides for the possibility to
complement or derogate from that Directive in the current crisis situation stemming
from Russia’s war of aggression against Ukraine, provided that the agreement of the
undertaking which concluded the framework agreement or contract is obtained. With
respect to additional quantities for Ukraine, Ukrainian contracting authorities should
enjoy the same conditions as the original contracting authority that concluded the
original framework agreement or contract. In addition, appropriate transparency
measures should be taken to ensure that all potentially interested parties are informed.
(37) The SAFE instrument provides financial assistance to Member States, enabling them
to carry out urgent and major public investments in support of the European defence
industry in response to the crisis situation resulting from the stark deterioration in the
Union’s security context. With that instrument, the Union started to support Member
States so that they can place orders rapidly, incentivising the defence industrial sector
to invest, in the very short term, in the strengthening of production capacities in order
26 Directive 2009/81/EC of the European Parliament and of the Council of 13 July 2009 on the
coordination of procedures for the award of certain works contracts, supply contracts and service
contracts by contracting authorities or entities in the fields of defence and security, and amending
Directives 2004/17/EC and 2004/18/EC (OJ L 216, 20.8.2009, p. 76, ELI:
http://data.europa.eu/eli/dir/2009/81/oj).
EN 10 EN
to be able to serve Member States’ needs by 2030. In addition, this Regulation should
support the placement of Ukrainian orders with the European Defence Technological
and Industrial Base in order to support the cooperation between the European Defence
Technological and Industrial Base and the Ukrainian Defence Technological and
Industrial Base. Such an exceptionally high demand for a wide range of defence
products carries an imminent risk of a severe negative impact on the proper
functioning of the internal market. In order to address that risk and in view of the
objective of this Regulation, taking into account the specific situation of Ukraine,
prioritisation measures at Union level that aim to ensure the availability of the defence
products concerned could prove to be indispensable in ensuring the proper functioning
of the internal market for defence products and its supply chains. In that respect, the
Commission should be able to use, upon a request of a Member State, priority-rated
requests for facilitating the supply of defence products to meet the objective of this
Regulation.
(38) Priority-rated requests should consist of requests by the Commission, upon an
initiative of a Member State, to relevant economic operators established in the Union
to accept or to prioritise orders of crisis-relevant products. Only to be used when
necessary and proportionate for the purpose of ensuring that defence supply chains can
operate normally, those priority-rated requests should be aimed at supporting Ukraine
which faces severe difficulties either in the placing of an order or in the execution of a
contract for the supply of defence products. Economic operators should have the
possibility to refuse to be subject to a priority-rated request. A priority-rated request
should be taken based on objective, factual, measurable and substantiated data. It
should have regard for the legitimate interests of the undertakings and the cost and
effort required for any change in production sequence. When accepted, the obligation
to perform the priority-rated request should take precedence over performance
obligations under private or public law. In light of the importance of ensuring the
supply of defence products, which are indispensable to the correct functioning of the
internal market and its supply chains, compliance with the obligation to perform a
priority-rated request should not entail liability to third parties for damages that might
result from any breach of contractual obligations governed by the law of a Member
State, to the extent that the breach of contractual obligations was necessary for
compliance with the mandated prioritisation. Where the economic operator has
expressly accepted a priority-rated request and the Commission has adopted an
implementing act following such an acceptance, the economic operator should comply
with all the conditions of that implementing act. Non-compliance by the economic
operator with the conditions laid down in the implementing act should result in a loss
of the benefit of a waiver of contractual liability. Where the non-compliance is
intentional or attributable to gross negligence, the Commission should be able to
impose on the economic operator concerned a fine, subject to the proportionality
principle.
(39) Given that specific amounts should be made available for budget assistance and
assistance to support Ukraine’s defence industrial capacities, coherence and
complementarity should be ensured in their respective implementation.
(40) This Regulation should apply without prejudice to the specific character of the security
and defence policy of certain Member States.
(41) The Instrument for Coordinated Support to Ukraine Agreement to be concluded
between the Commission and the Ukrainian authorities should contain provisions
aligned with the rights, responsibilities and obligations provided for in the Framework
EN 11 EN
Agreement under the Ukraine Facility referred to in Article 9 of Regulation (EU)
2024/792 signed between the Union and Ukraine that entered into force on 20 June
2024. Those provisions will ensure that the Union’s financial interests linked to the
Instrument for Coordinated Support to Ukraine are protected efficiently, providing the
appropriate measures relating to the prevention of, and fight against, fraud, corruption
and any other irregularities linked to the assistance. The Instrument for Coordinated
Support to Ukraine Agreement will also, in accordance with Regulation (EU,
Euratom) 2024/2509, grant the necessary rights and access to the Commission, OLAF,
the Court of Auditors and, where applicable, the EPPO, including from third parties
involved in the implementation of Union funds during and after the availability period
of the Instrument for Coordinated Support to Ukraine. Ukraine should also report
irregularities in relation to the use of the funds to the Commission, in line with the
procedures provided for in the Framework Agreement under the Ukraine Facility.
(42) Given Ukraine’s difficult situation caused by Russia’s war of aggression against it and
in order to support Ukraine in its long-term stability path, it is appropriate for the
Union to provide the Instrument for Coordinated Support to Ukraine as a limited
recourse loan that is to become due and payable when Ukraine receives cash or non-
monetary assets as war reparations, indemnities or any financial settlement, other than
territory, from Russia.
(43) The release of funds under the Instrument for Coordinated Support to Ukraine should
be contingent on the positive assessment by the Commission of a request for funds
submitted by Ukraine. For the macro-financial assistance, the assessment of the
conditions should be without prejudice to the assessment of the fulfilment of
conditions under other Union programmes and instruments. For the assistance to
support Ukraine’s defence industrial capacities, the release of funds should be linked
to contracts or agreements for activities, expenditures and measures to support
Ukraine’s defence industrial capacities related to defence products or other products
for defence purposes.
(44) This Regulation should lay down appropriate provisions for the financing of the
Instrument for Coordinated Support to Ukraine.
(45) In the context of Ukraine’s financing needs, it is appropriate to organise the financial
assistance under the diversified funding strategy provided for in Article 224 of
Regulation (EU, Euratom) 2024/2509.
(46) The Instrument for Coordinated Support to Ukraine should be repaid by Ukraine once
reparations from Russia are received, and the Union reserves its right to make use of
the Russian assets immobilised in the Union to repay the loan, in full accordance with
Union and international law.
(47) By way of derogation from Article 31(3) of Regulation (EU) 2021/947 of the
European Parliament and of the Council27, the financial liability from loans under this
Regulation should not be supported by the External Action Guarantee, established by
that Regulation. Support in the form of loans under this Regulation should constitute
27 Regulation (EU) 2021/947 of the European Parliament and of the Council of 9 June 2021 establishing
the Neighbourhood, Development and International Cooperation Instrument – Global Europe,
amending and repealing Decision No 466/2014/EU of the European Parliament and of the Council and
repealing Regulation (EU) 2017/1601 of the European Parliament and of the Council and Council
Regulation (EC, Euratom) No 480/2009 (OJ L 209, 14.6.2021, p. 1, ELI:
http://data.europa.eu/eli/reg/2021/947/oj).
EN 12 EN
financial assistance within the meaning of Article 223(1) of Regulation (EU, Euratom)
2024/2509. In considering the financial risks and the presence of guarantees, no
provisioning should be constituted for the support in the form of loans under this
Regulation, to be guaranteed over and above the ceilings, and, by way of derogation
from Article 214(1) of Regulation (EU, Euratom) 2024/2509, no provisioning rate
should be set.
(48) Given the situation of Ukraine, caused by Russia’s war of aggression against Ukraine
and to support it on its long-term stability path, it is appropriate to derogate from
Article 223(4), point (e), of Regulation (EU, Euratom) 2024/2509 in order to allow the
Union the possibility to provide a borrowing costs subsidy to cover the costs that
would otherwise be borne by Ukraine. Those costs comprise debt service costs (cost of
funding and cost of liquidity management) and related administrative costs. The
borrowing costs subsidy to be granted is deemed appropriate to ensure the
effectiveness of the support under the Instrument for Coordinated Support to Ukraine
within the meaning of Article 223(1) of Regulation (EU, Euratom) 2024/2509,
particularly to avoid adding pressure on Ukraine’s public finances.
(49) Union support to Ukraine under this Regulation should be managed by the
Commission.
(50) The assistance to Ukraine under the Instrument for Coordinated Support to Ukraine
should be additional and complementary to the Union support provided under the
Ukraine Facility. The Commission should, wherever possible, seek to minimise the
administrative and reporting burden on Ukraine.
(51) In the context of Russia’s war of aggression, which is grossly violating international
law and the principles of the UN Charter and undermining European and global
security and stability, it is appropriate for the Union to continue working with others in
the international community that provide support to Ukraine. In addition to ensuring
coordination and complementarity of support, it is appropriate for the Union to work
with like-minded partners in the implementation of the Instrument for Coordinated
Support to Ukraine to address Ukraine’s financing needs. To that end, the Union
should further develop its possibilities to work with third countries.
(52) As a first possibility, Regulation (EU) 2024/2773, which, inter alia, established the
Ukraine Loan Cooperation Mechanism to facilitate the implementation of the G7
‘Extraordinary Revenue Acceleration Loans for Ukraine’ (‘ERA loans’) initiative,
should be amended to support G7 members in providing new loans to Ukraine
(‘second-generation ERA loans’). Such new loans would be repaid from future flows
of extraordinary revenues stemming from the immobilisation of Russian sovereign
assets held in the Union and other relevant jurisdictions once the initially supported
loans have been repaid.
(53) Support under the Ukraine Loan Cooperation Mechanism should be available to cover
the repayment of the second-generation ERA loans, as well as the Ukraine Support
Loan and the Instrument for Coordinated Support to Ukraine. Once an initially
supported loan has been repaid, the allocation of support under the Ukraine Loan
Cooperation Mechanism should be adjusted to include any eligible second-generation
ERA loan from that same lender. Until such time as eligible second-generation ERA
loans replace the MFA Loan or eligible bilateral loans in the allocation of support,
they should not be considered in the allocation.
EN 13 EN
(54) In order to ensure that second-generation ERA loans provided by bilateral lenders can
swiftly and efficiently be supported by the Mechanism, the Commission should assess,
and where relevant approve for support, the second-generation ERA loans to be
provided by bilateral lenders. Where second-generation ERA loan agreements are in
draft form or have not yet entered into force, the Commission should monitor their
entry into force. In order to ensure a timely disbursement of second-generation ERA
loans to Ukraine, second-generation ERA loan agreements should enter into force by
30 June 2028.
(55) As a second possibility, to further address Ukraine’s financing needs and to ensure
maximum coordination and consistency across international partners and donors, it is
appropriate to enable third countries of high credit quality, that is to say benefitting
from the highest possible rating (AAA or equivalent) from at least two Credit Rating
Agencies registered in the European Union in accordance with Regulation (EC)
1060/200928 at the moment of entry into force of this Regulation, to provide
irrevocable, unconditional and on demand financial guarantees to the Union to allow
the mobilisation of up to EUR 5 billion in additional loans under Pillar I of the
Ukraine Facility while limiting the risk for the Union budget.
(56) These guarantees should provide the Union with financial safeguards for these
additional loans to Ukraine. It is appropriate to establish provisioning for these
guarantees in the Common Provisioning Fund. Taking into account the high credit
quality of those countries, it is appropriate to derogate from Article 214(2) of the
Financial Regulation, which would require coverage of losses under the loan
supported by those guarantees by global provisioning established in advance to cover
the net expected losses and, in addition, an adequate safety buffer. Instead, the
provisioning should be supported by an appropriate contribution by the guaranteeing
third country, equal to the equivalent of the annual exposures of the Union budget to
the reimbursement by Ukraine of the principal, interests and any amount on the loan
guaranteed by the third country. The third country should also commit to provide a
contribution to cover the borrowing costs subsidy when awarded by the Union to
Ukraine. In view of the availability of provisioning and to facilitate invoicing, it
should be possible to derogate from Article 111(2) of Regulation (EU, Euratom)
2024/2509 and adopt the legal commitment for the coverage of such borrowing costs
without prior making of the budgetary commitment.
(57) The Ukraine Plan should be amended to reflect such additional budget assistance,
stemming from contributions by third countries in the form of guarantees and in the
form of contributions to the provisioning.
(58) Regulation (EU) 2024/792 provides that the final qualitative and quantitative steps
under the Ukraine Plan are to be completed no later than 31 December 2027. It also
provides that, where the conditions for payment are not fulfilled in accordance with
the indicative timetable, the corresponding amounts may be withheld and subsequently
disbursed during the next payment window and up to 12 months after the original
deadline, provided that those conditions are fulfilled. In that context, it is appropriate,
for amounts made accessible pursuant to this Regulation to extend the loan availability
period until 30 June 2028 to ensure that the provisions of Regulation (EU) 2024/792
28 Regulation (EC) No 1060/2009 of the European Parliament and of the Council of 16 September 2009
on credit rating agencies (Text with EEA relevance) (OJ L 302, 17.11.2009, p.1 ELI:
http://data.europa.eu/eli/reg/2009/1060/oj).
EN 14 EN
on the rules on payments, withholding and reduction of non-repayable financial
support and loans can apply to those amounts and that Ukraine can exercise its right in
respect of those amounts.
(59) The Commission should duly take into account Council Decision 2010/427/EU29 and
the role of the European External Action Service, where appropriate.
(60) The competent committee of the European Parliament should be able to invite the
Commission to discuss in the Instrument for Coordinated Support to Ukraine dialogue
matters that concern the implementation of this Regulation. The Commission should
take into account elements arising from the views expressed through the Instrument
for Coordinated Support to Ukraine dialogue, including resolutions of the European
Parliament, if provided.
(61) In order to ensure that the European Parliament and the Council are able to follow the
implementation of this Regulation, the Commission should regularly inform them of
developments relating to Union assistance to Ukraine under this Regulation and
provide them with the relevant documents.
(62) In order to ensure the continued effectiveness of the arrangements established by this
Regulation, the Commission should regularly review their adequacy and report to the
European Parliament and to the Council thereon, thereby guaranteeing transparency
and accountability.
(63) In order to ensure uniform conditions for the implementation of this Regulation,
implementing powers should be conferred on the Commission. Those powers should
be exercised in accordance with Regulation (EU) No 182/2011.
(64) Since the objective of this Regulation, namely to provide financial and economic
assistance to Ukraine for 2027 in a predictable, continuous, orderly and timely manner
with a view to supporting Ukraine in covering its financing needs resulting from
Russia’s war of aggression against Ukraine, cannot be sufficiently achieved by the
Member States but can rather, by reason of its scale and effects, be better achieved at
Union level, the Union may adopt measures, in accordance with the principle of
subsidiarity as set out in Article 5 TEU. In accordance with the principle of
proportionality as set out in that Article, this Regulation does not go beyond what is
necessary in order to achieve those objective.
(65) In view of the urgency entailed by the exceptional circumstances caused by Russia’s
unprovoked and unjustified war of aggression against Ukraine, it is considered to be
appropriate to invoke the exception to the eight-week period provided for in Article 4
of Protocol No 1 on the role of national Parliaments in the European Union, annexed
to the TEU, to the TFEU and to the Treaty establishing the European Atomic Energy
Community.
(66) In light of the situation in Ukraine, this Regulation should enter into force as a matter
of urgency on the day following that of its publication in the Official Journal of the
European Union,
29 Council Decision 2010/427/EU of 26 July 2010 establishing the organisation and functioning of the
European External Action Service (OJ L 201, 3.8.2010, p. 30, ELI:
http://data.europa.eu/eli/dec/2010/427/oj).
EN 15 EN
HAVE ADOPTED THIS REGULATION:
CHAPTER I
GENERAL PROVISIONS
Article 1
Subject matter
1. This Regulation establishes an instrument for providing Union assistance to Ukraine for
2027 in the form of a loan to be repaid by reparations due by Russia (the ‘Instrument for
Coordinated Support to Ukraine’).
2. It lays down the objective of the Instrument for Coordinated Support to Ukraine, its
financing, the forms of Union funding under it and the rules for providing such funding.
Article 2
Objectives of the Instrument for Coordinated Support to Ukraine
1. The general objective of the Instrument for Coordinated Support to Ukraine shall be to
provide financial and economic assistance to Ukraine in a predictable, continuous,
orderly, flexible and timely manner with a view to supporting Ukraine in covering its
financing needs resulting particularly from Russia’s war of aggression against Ukraine
and Russia’s non-payment of reparations due.
2. To achieve the general objective referred to in paragraph 1, the specific objectives of the
Instrument for Coordinated Support to Ukraine shall be:
a. to support macro-financial stability via the easing of Ukraine’s external and internal
financing constraints; and
b. to support Ukraine’s defence industrial capacities through economic, financial and
technical cooperation.
Article 3
Definitions
For the purposes of this Regulation the following definitions apply:
(1) ‘defence product’ means goods, services and works that fall within the scope of
Directive 2009/81/EC, as set out in Article 2 thereof;
(2) ‘EEA EFTA State’ means a Member of the European Free Trade Association
which is a member of the European Economic Area;
(3) ‘ERA Loans’ means eligible bilateral loans and the Union’s macro-financial
assistance loan pursuant to Regulation (EU) 2024/2773;
EN 16 EN
(4) ‘other products for defence purposes’ means any good, service and work other
than those falling within the scope of Directive 2009/81/EC, as set out in
Article 2 thereof, which are necessary for or aimed at defence purposes.
Article 4
Available assistance under the Instrument for Coordinated Support to Ukraine
1. The Instrument for Coordinated Support to Ukraine shall be for a maximum amount of
EUR 45 000 000 000. That amount shall be made available to Ukraine in accordance
with the following indicative allocation:
a. EUR 10 000 000 000 for budget assistance in the form of a loan to be implemented
pursuant to Chapter III of Regulation (EU) 2024/792;
b. EUR 10 000 000 000 for macro-financial assistance granted for the purpose set out
in Chapter II this Regulation;
c. EUR 25 000 000 000 to support Ukraine’s defence industrial capacities in
accordance with Chapter III of this Regulation.
2. The Instrument for Coordinated Support to Ukraine shall be available until 30 June 2028.
It shall be made available by the Commission in instalments, which may be disbursed to
Ukraine in one or more tranches. The disbursement of all such tranches shall take place
by 31 December 2028.
3. If the financing needs of Ukraine decrease fundamentally during the period of
availability of the Instrument for Coordinated Support to Ukraine, including in the event
of a settlement by Russia of Ukraine’s war damages, the Commission, acting in
accordance with the examination procedure referred to in Article 24(3), may reduce the
undisbursed amount of the Instrument for Coordinated Support to Ukraine or cancel it.
4. If the financing needs of Ukraine change during the period of availability of the
Instrument for Coordinated Support to Ukraine and a need to reallocate amounts between
budget assistance in the form of a loan to be implemented under the Ukraine Facility
pursuant to Chapter III of Regulation (EU) 2024/792, macro-financial assistance in
accordance with Chapter II of this Regulation, and support to Ukraine’s defence
industrial capacities in accordance with Chapter III of this Regulation materialises, the
Commission, acting in accordance with the examination procedure referred to in Article
24(3), may deviate from the indicative allocation in paragraph 1 by up to 20% of each
EN 17 EN
amount, whilst respecting the maximum amount of the Instrument for Coordinated
Support to Ukraine.
Article 5
Preconditions for assistance under the Instrument for Coordinated Support to Ukraine
A precondition for granting the assistance under the Instrument for Coordinated Support to
Ukraine shall be that Ukraine continue to uphold and respect effective democratic
mechanisms, including a multi-party parliamentary system and the rule of law, and to
guarantee respect for human rights, including the rights of persons belonging to minorities.
Upholding and respecting the rule of law shall include the fight against corruption.
The Commission and the European External Action Service (EEAS) shall monitor the
fulfilment of the precondition set out in paragraph 1 of this Article, in particular before the
release of funds referred to in Article 20. Furthermore, that monitoring shall take into account
the relevant recommendations of international bodies, such as the Council of Europe and its
Venice Commission. The Commission shall inform the European Parliament and the Council
of its monitoring.
Article 6
Complementarity and coordination
1. In the implementation of the Instrument for Coordinated Support to Ukraine, the
Commission shall act in close cooperation with Ukraine, Member States, relevant
international bodies and donors to Ukraine, particularly through the Ukraine Donor
Platform and the Ukraine Defence Contact Group, to ensure a coherent and consistent
approach from those supporting Ukraine to address Ukraine’s financial and economic
assistance needs. In doing so, the Commission shall draw on the expertise of the EEAS.
2. Articles 5, 10, 11 and 12 and Article 20(1), point (b), of this Regulation shall apply in
accordance with Decision 2010/427/EU.
CHAPTER II
BUDGET ASSISTANCE IN THE FORM OF MACRO-FINANCIAL
ASSISTANCE
EN 18 EN
Article 7
Purpose
1. The macro-financial assistance shall contribute to covering Ukraine’s financing gap for
2027.
2. The release of the macro-financial assistance shall be managed by the Commission on
the basis of its assessment of the precondition set out in Article 5(1) and of the
satisfactory fulfilment of the policy conditions included in the Memorandum of
Understanding referred to in Article 8.
Article 8
Memorandum of Understanding
1. In respect of the amounts of macro-financial assistance as referred to in Article 4(1)
point (b), the Commission shall agree with Ukraine on policy conditions to which the
macro-financial assistance is to be linked. Those policy conditions shall be set out in a
Memorandum of Understanding (MoU).
2. The policy conditions shall include robust and ambitious reform commitments, including
those that aim, in particular, to strengthen revenue mobilisation to support Ukraine’s
financing needs and to tackle the root causes of corruption in public finances, including
via improving the sustainability and quality of public expenditure and enhancing the
efficiency, transparency and accountability of the public finance management systems.
Where relevant, those commitments shall be consistent with any programme that
Ukraine has with the IMF whilst going further where appropriate. Progress in attaining
the commitments shall be regularly monitored by the Commission.
3. The Commission shall approve the signature of the MoU, and of amendments to the
MoU, by means of implementing acts. Those implementing acts shall be adopted in
accordance with the examination procedure referred to in Article 24(3).
CHAPTER III
ASSISTANCE TO SUPPORT UKRAINE’S DEFENCE INDUSTRIAL
CAPACITIES
EN 19 EN
Article 9
Purpose
1. The assistance to support Ukraine’s defence industrial capacities shall aim to enable
Ukraine to carry out urgent and major public investments in support of the Ukrainian
defence industry and its integration into the European defence industry in response to
and following the current crisis situation. That assistance shall contribute, in particular,
to the reconstruction, recovery and modernisation of the Ukrainian Defence
Technological and Industrial Base, with a view to increasing its defence industrial
readiness, taking into account its gradual future integration into the European Defence
Technological and Industrial Base and through support for the timely availability of
defence products and other products for defence purposes, through cooperation between
the Union and Ukraine.
2. The activities, expenditures and measures to support Ukraine’s defence industrial
capacities shall be related to defence products or other products for defence purposes and
shall aim to:
a. speed up the adjustment of the Ukrainian defence industry to structural changes,
including through the creation and ramp-up of its manufacturing capacities as well
as related supporting activities;
b. improve the timely availability of defence products or other products for defence
purposes for Ukraine, including through the reduction of their delivery lead time,
reservation of manufacturing slots or stockpiling of defence products or other
products for defence purposes, intermediate products or raw materials; or
c. enhance cross-border cooperation between the European Defence Technological
and Industrial Base and the Ukrainian Defence Technological and Industrial Base,
taking into account the defence industrial reinforcement and defence procurement
needs of Ukraine, allowing for interchangeability of defence products or other
products for defence purposes manufactured by the Ukrainian defence industry and
the European defence industry.
EN 20 EN
Article 10
Eligibility
1. The activities, expenditures and measures to support Ukraine’s defence industrial
capacities related to defence products and other products for defence purposes shall be
eligible for assistance provided that they comply with the eligibility conditions set out in
this Article.
2. Defence products shall belong to one of the following categories:
a. category one: ammunition and missiles; artillery systems, including deep precision
strike capabilities; ground combat capabilities and their support systems, including
soldier equipment and infantry weapons; small drones (NATO class 1) and related
anti-drone systems; critical infrastructure protection; cyber; and military mobility
including counter-mobility;
b. category two: air and missile defence systems; maritime surface and underwater
capabilities; drones other than small drones (NATO classes 2 and 3) and related
anti-drone systems; strategic enablers such as, but not limited to, strategic airlift,
air-to-air refuelling, C4ISTAR systems as well as space assets and services; space
assets protection; artificial intelligence and electronic warfare.
3. The activities, expenditures and measures to support Ukraine’s defence industrial
capacities related to defence products or other products for defence purposes shall not
contravene the security and defence interests of the Union and its Member States as
established in the framework of the common foreign and security policy (CFSP)
pursuant to Title V of the TEU, including respect for the principle of good neighbourly
relations, or the objectives set out in Article 2 of this Regulation.
4. Defence products shall be produced in compliance with the following conditions:
a. manufacturers and subcontractors involved in the production of the defence
products shall be established and have their executive management structures in the
Union, in an EEA EFTA State or in Ukraine. They shall not be subject to control by
a third country which is not an EEA EFTA State or Ukraine or by another third-
country entity which is not established in the Union, in an EEA EFTA State or in
Ukraine;
EN 21 EN
b. by way of derogation from point (a), in order to take into account industrial
cooperation with non-EU partners, defence products that involve a subcontractor
involved in the production which is allocated between 15 % and 35 % of the value
of the contract, and that is not established or does not have its executive
management structures in the Union, in an EEA EFTA State or in Ukraine, shall be
eligible provided that at least one of the following conditions are met:
i. a direct contractual relationship related to the defence product has been
established between the manufacturer and that subcontractor prior to 28 May
2025; or
ii. the manufacturer commits to studying, within two years, the feasibility of
replacing the input provided by that subcontractor with an alternative,
restriction-free input originating in the Union, in an EEA EFTA State or in
Ukraine, and meeting technical and time requirements;
c. by way of derogation from point (a) of this paragraph, defence products involving
manufacturers or subcontractors established in the Union and controlled by another
third country which is not an EEA EFTA State or Ukraine or by another third-
country entity which is not established in the Union, in an EEA EFTA State or in
Ukraine shall be eligible if that manufacturer or subcontractor has been subject to
screening within the meaning of Regulation (EU) 2019/452 of the European
Parliament and of the Council (30) and, where necessary, to appropriate mitigation
measures, or if that manufacturer or subcontractor provides guarantees in
accordance with point (d) of this paragraph, verified by the Member State in which
it is established;
d. the guarantees referred to in point (c) of this paragraph shall provide assurances that
the involvement of the manufacturer or subcontractor in the production of the
defence product does not contravene the security and defence interests of the Union
and its Member States as established in the framework of the CFSP pursuant to
Title V of the TEU. Those guarantees shall in particular substantiate that, for the
purposes of activities, expenditures and measures, measures are in place to ensure
that:
30 Regulation (EU) 2019/452 of the European Parliament and of the Council of 19 March 2019 establishing a framework for
the screening of foreign direct investments into the Union (OJ L 79 I, 21.3.2019, p. 1, ELI:
http://data.europa.eu/eli/reg/2019/452/oj).
EN 22 EN
i. control over the manufacturer or subcontractor is not exercised in a manner
that restrains or restricts its ability to carry out the activities, expenditures and
measures supported; and
ii. access by a non-associated third country or by a non-associated third-country
entity to classified or sensitive information relating to the defence product
produced is prevented and the employees or other persons involved in the
production of the defence product have national security clearance issued by a
Member State, where appropriate, in accordance with national laws and
regulations;
e. the infrastructure, facilities, assets and resources of the manufacturers and
subcontractors involved in the production of the defence products shall be located in
the territory of a Member State, an EEA EFTA State or Ukraine. Where
manufacturers or subcontractors involved in the production of the defence products
have no readily available alternatives or relevant infrastructure, facilities, assets and
resources in the territory of a Member State, an EEA EFTA State or Ukraine, they
may use their infrastructure, facilities, assets and resources which are located or
held outside those territories, provided that such use does not contravene the
security and defence interests of the Union and its Member States;
f. manufacturers and subcontractors involved in the production of the defence
products may be considered to fulfil the eligibility conditions referred to in this
paragraph where they have fulfilled equivalent conditions under Regulations (EU)
2018/1092 (31), (EU) 2021/697 (32), (EU) 2023/1525 (33), or (EU) 2023/2418 (34) of
the European Parliament and of the Council or under Regulation (EU) 2025/1106
31 Regulation (EU) 2018/1092 of the European Parliament and of the Council of 18 July 2018 establishing the European
Defence Industrial Development Programme aiming at supporting the competitiveness and innovation capacity of the
Union’s defence industry (OJ L 200, 7.8.2018, p. 30, ELI: http://data.europa.eu/eli/reg/2018/1092/oj).
32 Regulation (EU) 2021/697 of the European Parliament and of the Council of 29 April 2021 establishing the European
Defence Fund and repealing Regulation (EU) 2018/1092 (OJ L 170, 12.5.2021, p. 149, ELI:
http://data.europa.eu/eli/reg/2021/697/oj).
33 Regulation (EU) 2023/1525 of the European Parliament and of the Council of 20 July 2023 on supporting ammunition
production (ASAP) (OJ L 185, 24.7.2023, p. 7, ELI: http://data.europa.eu/eli/reg/2023/1525/oj).
34 Regulation (EU) 2023/2418 of the European Parliament and of the Council of 18 October 2023 on establishing an
instrument for the reinforcement of the European defence industry through common procurement (EDIRPA) (OJ L,
2023/2418, 26.10.2023, ELI: http://data.europa.eu/eli/reg/2023/2418/oj).
EN 23 EN
and provided that no subsequent changes call into question the fulfilment of those
conditions;
g. the cost of components originating outside the Union, EEA EFTA States and
Ukraine shall not be higher than 35 % of the estimated cost of the components of
the defence product. No component shall be sourced from a third country that
contravenes the security and defence interests of the Union and its Member States;
h. for defence products related to category two as referred to in paragraph 2, point (b),
of this Article, manufacturers shall have the ability to decide, without restrictions
imposed by third countries or by third-country entities, on the definition, adaptation
and evolution of the design of the defence product procured, including the legal
authority to substitute or remove components that are subject to restrictions imposed
by third countries or by third-country entities.
For the purposes of the first subparagraph of this paragraph, ‘subcontractors involved in
the production of the defence products’ means any legal entity which provides critical
inputs that possess unique attributes essential for the functioning of the defence product,
which is allocated at least 15 % of the value of the contract, and which needs access to
classified information for the performance of the contract.
5. By way of derogation from paragraphs 2 and 4 and in full respect of paragraph 3, where
there is an urgent need for the delivery of a given defence product stemming from
Russia’s war of aggression against Ukraine, the procurement of a defence product which
does not comply with one or more of the conditions set out in paragraphs 2 and 4 shall be
eligible for financial assistance under this Chapter provided that:
a. there is no equivalent product that responds to that urgent need which complies with
the conditions set out in paragraphs 2 and 4 or it is not available at the required
scale and whose delivery lead time is commensurate with the urgency of the
situation and Ukraine’s immediate operational needs; or
b. the delivery lead time for such defence product is significantly shorter than for a
defence product which would comply with the conditions set out in paragraphs 2
and 4 of this Article, even if that defence product was subject to a priority-rated
request as referred to in Article 16.
In such a case, Ukraine shall provide the information reasonably available to it
demonstrating that the conditions for the application of this derogation are met. That
EN 24 EN
information shall be checked by the Commission after consultation with the Expert
Group referred to in Article 12 without undue delay.
The procurement of defence products from manufacturers established in third countries
other than EEA EFTA States and Ukraine shall be made only where there are no other
alternatives available in the Union, EEA EFTA States and Ukraine under the conditions
set out in the first subparagraph, points (a) and (b). In the context of the first
subparagraph, points (a) and (b), that information shall include a legal commitment on
compliance with the delivery lead time.
The Commission shall approve the derogations referred to in this paragraph by means of
implementing acts, acting in accordance with the examination procedure referred to in
Article 24(3).
6. Where applicable, Member States shall ensure that the procurement procedures and
contracts for other products for defence purposes resulting from procurements receiving
support under the Instrument for Coordinated Support to Ukraine contain appropriate
eligibility conditions to protect the security and defence interests of the Union and its
Member States.
7. By way of derogation from paragraph 4, contributions in accordance with paragraph 8,
point (e), shall be utilised in line with the eligibility conditions of the Union programme
concerned.
8. Activities, expenditures and measures related to defence products or other products for
defence purposes shall be implemented in accordance with one of the following methods
of implementation:
a. procurements by Ukraine, subject to the procurement and delivery being validated
by the Commission or Member States. Ukraine shall be responsible for such
procurements in accordance with Ukrainian law, where validations by the
Commission or Member States shall include, on a sample basis, checks on
contractual documentation, invoices and delivery certificates, physical inspections
to suppliers and physical verification of deliveries;
b. procurements by Ukraine that are a common procurement in accordance with
Regulation (EU) 2025/1106;
c. agreements between Ukraine and Member States or the European Defence Agency
(EDA);
EN 25 EN
d. procurement agreements between Ukraine and international or intergovernmental
organisations; or
e. contributions by Ukraine to the Ukraine Support Instrument established by
Regulation (EU) 2025/2643, the Ukraine Investment Framework established by
Regulation (EU) 2024/792 for dual-use goods or other Union programmes.
Activities, expenditures and measures related to other products for defence purposes may
also be implemented by procurements by Ukraine for procurements below EUR 7 000
000, provided that sound financial management and the protection of the financial
interest of the Union are ensured.
9. Contracts entered into by Ukraine relating to procurements, agreements or contributions
referred to in paragraph 8 shall be eligible if signed after [Date of adoption of the
Commission proposal] provided that they comply with this Article.
10. The Commission is empowered to adopt delegated acts in accordance with Article 23 to
supplement this Regulation by extending eligibility to third countries other than EEA
EFTA States and Ukraine that do not contravene the security and defence interests of the
Union and its Member States, provided that those third countries have concluded an
agreement with the Union in accordance with Article 17 of Regulation (EU) 2025/1106.
Each delegated act shall specify, for each of the third countries concerned, to which of
the defence products this provision shall apply. Upon entry into force of a delegated act,
the third country shall be considered to be included among the EEA EFTA States and
Ukraine for the purpose of Article 10(4) as regards those defence products.
11. Notwithstanding paragraph 10, the Council, acting on a proposal from the Commission,
may adopt an implementing act to determine that a third country other than EEA EFTA
States and Ukraine that does not contravene the security and defence interests of the
Union and its Member States and that has not concluded an agreement with the Union in
accordance with Article 17 of Regulation (EU) 2025/1106, fulfils the following
cumulative conditions:
a. the third country has committed to provide a fair and proportionate financial
contribution to the costs arising from borrowing, commensurate with the value of
contracts awarded to entities established in that third country. Such contribution
shall take the form of cash to the borrowing costs subsidy on the basis of a
contribution agreement between the third country and the Union. It shall constitute
EN 26 EN
external assigned revenue in accordance with Article 21(2), point (e), of Regulation
(EU, Euratom) 2024/2509;
b. the third country has entered into a Security and Defence Partnership with the
Union; and
c. the third country is providing financial and military support to Ukraine in a
significant manner.
The Council implementing act shall specify, for each of the third countries concerned, to
which defence products this provision is to apply, taking into account the conditions of
this paragraph.
Upon entry into force of the Council implementing act, the third country shall be
considered to be included among the EEA EFTA States and Ukraine for the purpose of
Article 10(4) as regards those defence products.
The Council, acting by qualified majority, may amend the Commission’s proposal and
adopt the amended text by means of an implementing decision.
Article 11
Product schedules
1. In respect of the amounts of assistance to support Ukraine’s defence industrial capacities
as referred to in Article 4(1), point (c), Ukraine shall draw up a schedule for each
activity, expenditure or measure related to a defence product or other product for defence
purposes for which it intends to request assistance. That schedule shall set out:
a. a description of the defence product or other product for defence purposes; and
b. information on compliance with Article 10.
2. Ukraine shall consult the schedule with the Commission with a view to ensuring
compliance with Article 10 and the achievement of the objectives of the Regulation, in
particular enhancing cooperation between the European Defence Technological and
Industrial Base and the Ukrainian Defence Technological and Industrial Base. Should
Ukraine not identify a method of implementation in accordance with Article 10(8) or
should the Commission consider that an alternative method of implementation is more
economical, efficient or effective, the Commission may propose a method of
implementation to Ukraine. When proposing to Ukraine the most appropriate method of
EN 27 EN
implementation, the Commission shall take into consideration the timeliness of delivery
of the relevant defence product or other product for defence purposes, activity,
expenditure or measure, further enhancement of cooperation between the European
Defence Technological and Industrial Base and the Ukrainian Defence Technological
and Industrial Base, the prices available, the past experience with that method of
implementation and, where warranted, past experience with manufacturers under that
method of implementation. In determining whether an alternative method of
implementation is more economical or when considering the prices available, the
Commission shall take into consideration any co-financing that is to be provided by
Member States.
3. In the context of the consultation referred to in paragraph 2, the Commission may also
propose alternative activities, expenditures and measures that would enable to further
enhance cooperation between the European Defence Technological and Industrial Base
and the Ukrainian Defence Technological and Industrial Base.
4. By derogation from paragraph 1 of this Article, Ukraine shall not be required to draw up
a schedule for implementation in accordance with Article 10(8), first subparagraph, point
(e).
Article 12
Ukraine’s Defence Industrial Capacities Expert Group
1. To support the implementation of assistance to support Ukraine’s defence industrial
capacities, the Commission shall establish Ukraine’s Defence Industrial Capacities
Expert Group.
2. In addition to representatives of the Commission, the EEAS and the EDA, Ukraine’s
Defence Industrial Capacities Expert Group shall include representatives of Member
States and the EEA EFTA States. Third countries referred to in Article 10(10) shall be
permitted to nominate representatives. Ukraine shall be invited to the meetings of
Ukraine’s Defence Industrial Capacities Expert Group as appropriate.
3. Ukraine’s Defence Industrial Capacities Expert Group shall provide advice, expertise
and support on the defence products and other products for defence purposes, on the
method of implementation, on the derogations under Article 10(5) and on the product
schedules, including on the compliance with Article 10(3).
EN 28 EN
Article 13
Administration of the assistance to support Ukraine’s defence industrial capacities
Ukraine shall open one or more special accounts for the sole purpose of the management
of the financial and economic assistance received to support Ukraine’s defence industrial
capacities. The following rules shall apply in relation to those accounts:
a. all payments of the contracts or agreements that are requested for assistance to
support Ukraine’s defence industrial capacities shall be paid from those accounts;
b. the Commission shall be granted monitoring rights of those accounts;
c. Ukraine shall provide the Commission with a monthly report, to be submitted
within 10 working days of the end of each month, containing the following
information:
i. the date and amount of each payment made from the accounts during the
preceding month;
ii. the name of the recipient of each payment;
iii. a description of the purpose of each payment and how it relates to the contracts
or agreements submitted in requests for funds;
iv. any other information as may be reasonably requested by the Commission.
Article 14
Monitoring of implementation
1. The Commission shall monitor the implementation of assistance to support Ukraine’s
defence industrial capacities, including particularly the delivery of products, in
accordance with this Article.
2. For procurements by Ukraine in accordance with Article 10(8), first subparagraph, point
(a), that are validated by the Commission, the Commission shall utilise the validation
process therein.
3. For procurements by Ukraine in accordance with Article 10(8), first subparagraph, point
(a), that are validated by Member States, the Member State shall monitor the
implementation of the procurement and the delivery in accordance with that provision
and report to the Commission.
EN 29 EN
4. For procurements by Ukraine in accordance with Article 10(8), first subparagraph, point
(b), the Member States that are part of such a common procurement shall monitor the
implementation of the procurement and the delivery and report to the Commission.
5. For agreements between Ukraine and Member States in accordance with Article 10(8),
first subparagraph, point (c), the Member State shall monitor the implementation of the
agreement and the delivery and report to the Commission.
6. For agreements between Ukraine and the EDA in accordance with Article 10(8), first
subparagraph, point (c), the EDA shall monitor the implementation of the agreement and
the delivery and report to the Commission.
7. For procurement agreements between Ukraine and international or intergovernmental
organisations in accordance with Article 10(8), first subparagraph, point (d), Ukraine
shall include in such procurement agreements obligations on the respective international
or intergovernmental organisations to monitor the implementation of the procurement
and the delivery and to report to the Commission.
8. Paragraphs 1 to 7 of this Article shall not apply to procurements by Ukraine in
accordance with Article 10(8) regarding activities, expenditures and measures related to
other products for defence purposes below EUR 7 000 000. However, Ukraine shall
regularly report to the Commission on how it monitors the implementation of these
procurements and delivery. The Commission shall undertake risk-based controls.
9. Should the Commission be notified by Ukraine of the non-implementation of a contract
or agreement in accordance with Article 17(2), point (g), or become aware of the non-
delivery of products under this Article or the non-use of funds in the accounts referred to
in Article 13, the Commission shall engage with Ukraine to repurpose those funds in
accordance with this Regulation.
Article 15
Modification of framework agreements or contracts
1. Where activities, expenditures and measures related to defence products are implemented
through the methods referred to in Article 10(8), first subparagraph, point (b) or point
(c), within the Union, the rules provided for in paragraphs 2 to 4 of this Article shall
apply to an existing framework agreement or contract that has as its object the purchase
of defence products, which is used in that implementation method, and which does not
EN 30 EN
provide for the possibility to substantially amend it. When applying paragraphs 2 and 3
of this Article, the contracting authority that concluded the framework agreement or
contract shall obtain the prior agreement of the undertaking with which it has concluded
that framework agreement or contract.
2. A contracting authority of a Member State may modify an existing framework agreement
or contract for defence products, where that framework agreement or contract has been
concluded with an undertaking complying with criteria equivalent to those laid down in
Article 10(4) and (5) of this Regulation, in order to add Ukraine as a party to that
framework agreement or contract.
3. By way of derogation from Article 29(2), third subparagraph, of Directive 2009/81/EC, a
contracting authority of a Member State may make substantial amendments to the
quantities set out in a framework agreement or contract, with an estimated value above
the thresholds laid down in Article 8 of Directive 2009/81/EC, where that framework
agreement or contract has been concluded with an undertaking that complies with criteria
equivalent to those laid down in Article 10(4) and (5) of this Regulation, and insofar as
the modification is strictly necessary for the application of paragraph 2 of this Article.
4. For the purpose of calculating the value referred to in paragraph 3, the updated value
shall be the reference point when the contract includes an indexation clause.
5. A contracting authority which has modified a framework agreement or contract in the
cases referred to in paragraph 2 or paragraph 3 of this Article shall publish a notice to
that effect in the Official Journal of the European Union in accordance with Article 32 of
Directive 2009/81/EC.
6. In the cases referred to in paragraphs 2 and 3, the principle of equal rights and
obligations shall apply between the contracting authorities which are party to the
framework agreement or contract, in particular regarding the cost of additional quantities
procured.
Article 16
Voluntary prioritisation of defence products
1. For the sole purpose of this Regulation and where Ukraine is confronted with severe
difficulties in the placing or in the execution of a contract for the supply of defence
products that are urgently needed and meet the eligibility requirements set out in Article
EN 31 EN
10(4) or (5), an economic operator together with the Member State on the territory of
which its production site is located may jointly submit a request to the Commission to
issue a prioritisation measure to prioritise a certain order of such products manufactured
by that economic operator.
2. The joint request referred to in paragraph 1 shall include the following elements:
a. the initial request from Ukraine;
b. the list of products to be subject to the prioritisation measure, their specifications
and the quantities in which they are to be supplied;
c. the time limits within which the delivery of the defence products is to be completed;
d. evidence that the economic operator cannot meet the request from Ukraine referred
to in point (a) without a prioritisation measure; and
e. an indication of a fair and reasonable price at which the prioritisation measure could
be placed as well as elements substantiating that price.
3. Upon receipt of a request as referred to in paragraph 1, the Commission shall assess that
request without undue delay.
4. The Commission shall base the assessment referred to in paragraph 3 on objective,
factual, measurable and substantiated data, with the aim of determining whether such
prioritisation is indispensable in order to address the severe difficulties referred to in
paragraph 1.
5. Where the assessment referred to in paragraph 3 concludes that the prioritisation is
indispensable, the Commission shall, by means of an implementing act, adopt a
prioritisation measure setting out:
a. the legal basis of the priority-rated request to be complied with by the economic
operator;
b. the list of products subject to the priority-rated request, their specifications and the
quantities in which they are to be supplied;
c. the time limits within which the priority-rated request is to be completed;
d. the beneficiaries of the priority-rated request;
e. the scope of contractual obligations over which the priority-rated request shall have
precedence;
EN 32 EN
f. the waiver of contractual liability under the conditions laid down in paragraph 7;
and
g. the penalties provided for in paragraphs 12 to 18 for non-compliance with the
obligations stemming from that implementing act.
The implementing act referred to in the first subparagraph of this paragraph shall be
adopted in accordance with the examination procedure referred to in Article 24(3).
6. The prioritisation measure referred to in paragraph 5 shall:
a. be placed at a fair and reasonable price, adequately taking into account the
economic operator’s opportunity costs when fulfilling the prioritisation measure as
compared to existing contractual obligations; and
b. take precedence over any contractual obligations under private or public law related
to the defence products subject to the prioritisation measure, under the conditions
laid down in the implementing act referred to in paragraph 5.
7. The economic operator subject to a prioritisation measure pursuant to paragraph 5 shall
not be liable for any breach of contractual obligation that is governed by the law of a
Member State, provided that:
a. the breach of contractual obligation is strictly necessary for compliance with the
required prioritisation;
b. the implementing act referred to in paragraph 5 has been complied with; and
c. the request referred to in paragraph 1 did not have the sole purpose of unduly
avoiding a prior performance obligation under private or public law.
8. The economic operator subject to a prioritisation measure may request the Commission
to amend the implementing act referred to in paragraph 5 where it considers it to be duly
justified based on one of the following grounds:
a. the economic operator is unable to perform the prioritisation measure on account of
insufficient production capability or production capacity, even under preferential
treatment of the request;
b. completion of the prioritisation measure would place an unreasonable economic
burden on, and entail particular hardship for, the economic operator.
EN 33 EN
9. The economic operator shall provide all relevant and substantiated information to allow
the Commission to assess the merits of the request for amendment referred to in
paragraph 8.
10. Based on the examination of the reasons and evidence provided by the economic
operator, the Commission may, after consultation and prior agreement of the Member
State on the territory of which the relevant production site of the economic operator
concerned is located, amend its implementing act to release, partially or in totality, the
economic operator concerned from its obligations under this Article.
11. Where an economic operator, after having expressly accepted to prioritise the orders
requested by the Commission, intentionally or through gross negligence does not comply
with the obligation to prioritise those orders, it shall be subject to fines set out in
paragraphs 12 to 18, except where:
a. the economic operator is unable to perform the priority-rated request on account of
insufficient production capability or production capacity, or on technical grounds;
or
b. performance or completion of the request would place an unreasonable economic
burden on, and entail particular hardship for, the economic operator, including
substantial risks relating to business continuity.
The revenue from the fines shall constitute external assigned revenue within the meaning
of Article 21(5) of Regulation (EU, Euratom) 2024/2509 to an external assistance
programme under which Ukraine is eligible.
12. Where it deems it to be necessary and proportionate, the Commission may, by means of
implementing acts, impose on the economic operators fines not exceeding EUR 300 000
where the economic operator, intentionally or through gross negligence, does not comply
with the obligation to perform the priority-rated request pursuant to this Article.
The implementing acts referred to in the first subparagraph of this paragraph shall be
adopted in accordance with the examination procedure referred to in Article 24(3).
13. Before taking a decision pursuant to paragraph 12, the Commission shall provide an
opportunity for the economic operator concerned to be heard in accordance with
paragraph 15. The Commission shall take into account any duly reasoned justification
presented by the economic operator for the purpose of determining whether fines are
deemed necessary and proportionate.
EN 34 EN
14. In fixing the amount of the fine, the Commission shall take into consideration the nature,
gravity and duration of the infringement, including whether the economic operator has
partially complied with the priority-rated order or the priority-rated request.
15. Before taking a decision pursuant to paragraph 12, the Commission shall ensure that the
economic operators concerned have been given the opportunity to submit observations
on:
a. the preliminary findings of the Commission, including any matter in relation to
which the Commission has raised objections;
b. the measures that the Commission may intend to take in view of the preliminary
findings pursuant to point (a) of this paragraph.
16. The economic operators concerned may submit to the Commission their observations on
the Commission’s preliminary findings within a time limit which shall be fixed by the
Commission in its preliminary findings, and which may not be less than 14 working
days.
17. The Commission shall base its imposition of fines only on objections on which the
economic operators concerned have been able to comment.
18. Where the Commission has informed the economic operators concerned of its
preliminary findings as referred to in paragraph 15, it shall give access, if so requested,
to the Commission’s file under the terms of a negotiated disclosure, subject to the
legitimate interest of economic operators in the protection of their business secrets, or in
order to preserve business secrets or other confidential information of any person. The
right of access to the file shall not extend to confidential information and internal
documents of the Commission or the authorities of the Member States, in particular to
correspondence between the Commission and the authorities of the Member States. This
paragraph shall not prevent the Commission from disclosing and using information
necessary to prove an infringement.
19. This Article is without prejudice to the rights of the Member States to protect their
essential security interests in accordance with Article 346(1), point (b), TFEU.
CHAPTER IV
FINANCING AND IMPLEMENTATION
EN 35 EN
Article 17
Instrument for Coordinated Support to Ukraine Agreement
1. The detailed financial terms of the Instrument for Coordinated Support to Ukraine shall
be laid down in the Instrument for Coordinated Support to Ukraine Agreement.
2. In addition to the elements laid down in Article 223(4) of Regulation (EU, Euratom)
2024/2509, the Instrument for Coordinated Support to Ukraine Agreement shall require
that:
a. the Instrument for Coordinated Support to Ukraine is to be a limited recourse loan
that becomes due and payable upon the occurrence of a repayment trigger as
defined in subparagraph (j);
b. Ukraine provides the Union with a security interest over its claim on Russia for
reparations as security for the Instrument for Coordinated Support to Ukraine. The
value of that security interest shall at any given time be equal to the value of
disbursed funds under the Instrument for Coordinated Support to Ukraine;
c. the rights, responsibilities and obligation provided for in the Framework Agreement
under the Ukraine Facility referred to in Article 9 of Regulation (EU) 2024/792
apply to the Instrument for Coordinated Support to Ukraine Agreement and the
funds therein;
d. the amount of assistance referred to in Article 4(1), point (a), of this Regulation is to
be implemented in accordance with Chapter III of Regulation (EU) 2024/792, with
the exception of rules on the duration and repayment of the loan, including the
borrowing costs subsidy, as referred to in Article 19, which are to be governed by
this Regulation;
e. Ukraine utilises the same management and control systems as proposed in the
Ukraine Plan established under Regulation (EU) 2024/792, including beyond the
availability period referred to in Article 6(2) of that Regulation;
f. the Commission has the right to monitor activities, expenditures and measures
under Chapter III of this Regulation that are carried out by the Ukrainian authorities,
along the whole project cycle;
EN 36 EN
g. Ukraine is to immediately notify the Commission should a draft contract or
agreement financed through the Instrument for Coordinated Support to Ukraine not
be implemented;
h. Ukraine continues to respect the precondition set out in Article 5(1);
i. Ukraine does not reverse any measure taken under any other current or previous
instruments of support provided by the Union or IMF concerning anti-corruption;
j. Ukraine is to be liable for the repayment of the principal of the Instrument for
Coordinated Support to Ukraine within 30 days, if any of the following conditions
are fulfilled, each constituting a repayment trigger for the purposes of this
Regulation:
i. the receipt of cash by Ukraine for war reparations, indemnities or any financial
settlement from Russia, up to the amount of such settlement;
ii. 90 days from the receipt of non-monetary assets by Ukraine for war
reparations, indemnities or any financial settlement from Russia, except
territory, up to the amount of such settlement which is to be determined by an
independent valuation. Upon request of Ukraine, the Commission may grant an
extension of this timeframe if strictly warranted;
iii. that Ukraine is in breach of point (h); or
iv. it has been established that, in relation to the management of the Instrument for
Coordinated Support to Ukraine, Ukraine has engaged in any act of fraud,
corruption or any other illegal activity detrimental to the financial interests of
the Union.
k. Ukraine is liable to repay the Instrument for Coordinated Support to Ukraine:
i. where the conditions set out in point (j)(i) and (ii) are fulfilled, for an amount
of the monetary value of the war reparations, indemnities or any financial
settlement from Russia equal to the proportion of the Instrument for
Coordinated Support to Ukraine outstanding against the sum of the value of the
Instrument for Coordinated Support to Ukraine outstanding, the value of the
loan provided for in Regulation (EU) 2026/467 outstanding, any outstanding
reparations loans provided by G7 members, any outstanding liabilities under
EN 37 EN
ERA Loans and any outstanding liabilities under loans approved by the
Commission in accordance with Article 6a of Regulation (EU) 2024/2773;
ii. where the condition set out in point (j)(iii) is fulfilled, for the total outstanding
amount of the Instrument for Coordinated Support to Ukraine;
iii. where the condition set out in point (j)(iv) is fulfilled, for the value of fraud,
corruption or any other illegal activity detrimental to the financial interests of
the Union.
l. any amounts of the Instrument for Coordinated Support to Ukraine not covered by
the liability referred to in point (k) are to remain in place until future repayment
trigger events occur;
m. in the case of payments or recoveries, Ukraine is to indicate the relevant payments
from the Instrument for Coordinated Support to Ukraine that are being repaid or
recovered;
n. the Union has the right to make use of Russian assets immobilised in the Union to
repay the loan, in full accordance with Union and international law;
o. amounts made available for the Instrument for Coordinated Support to Ukraine
pursuant to Regulation (EU) 2024/2773 shall be utilised to reduce the principal of
the loan;
p. Ukraine is to ensure that the procurement procedures and contracts for other
products for defence purpose resulting from procurement receiving support under
the Instrument for Coordinated Support to Ukraine contain appropriate eligibility
conditions to protect the security and defence interests of the Union and its Member
States;
q. for assistance to support Ukraine’s defence industrial capacities, Ukraine shall not
submit the same activities, expenditures and measures under different Union
support programmes.
The Instrument for Coordinated Support to Ukraine Agreement shall also include any
other requirements needed for the implementation of the Instrument for Coordinated
Support to Ukraine, including those necessary to implement Article 14 of this
Regulation.
EN 38 EN
3. Non-compliance with the terms of the Instrument for Coordinated Support to Ukraine
Agreement shall constitute a ground for the Commission to suspend or cancel, in full or
in part, the release of the instalment or tranches. Non-compliance with repayment terms
of the Instrument for Coordinated Support to Ukraine Agreement shall additionally
constitute a ground for the total or part of the outstanding amount of the Instrument for
Coordinated Support to Ukraine to become due and payable.
4. The Instrument for Coordinated Support to Ukraine Agreement shall be made available,
upon request, simultaneously to the European Parliament and to the Council.
Article 18
Request for funds
1. To receive financial and economic assistance, Ukraine shall submit to the Commission a
duly justified request for funds. Such a request for funds may be submitted by Ukraine to
the Commission, in principle, six times per year.
2. For budget assistance in the form of a loan to be implemented pursuant to Chapter III of
Regulation (EU) 2024/792, the request for funds shall be submitted in accordance with
Chapter III of Regulation (EU) 2024/792.
3. For macro-financial assistance in accordance with Chapter II of this Regulation, the
request for funds shall be accompanied by a report in accordance with the provisions of
the MoU.
4. For assistance to support Ukraine’s defence industrial capacities in accordance with
Chapter III of this Regulation:
a. the request for funds may cover multiple products. For each covered product, the
request for funds shall contain a contract or agreement in compliance with Article
10 and a schedule in accordance with Article 11. Such contracts or agreements may
be signed or in a finalised draft form;
b. if the request for funds requests funding for an amount greater than 20 % of the
amount of assistance to support Ukraine’s defence industrial capacities as referred
to in Article 4(1), point (c), Ukraine shall provide a detailed justification, including
on the impact for future requests for funds under that implementing decision.
EN 39 EN
Article 19
Borrowing costs subsidy
1. By way of derogation from Article 223(4), point (e), of Regulation (EU, Euratom)
2024/2509 and subject to available resources, the Union may bear the costs arising from
the borrowing for a loan to Ukraine that would otherwise be borne by Ukraine
(‘borrowing costs subsidy’). Those costs comprise service costs (cost of funding, cost of
liquidity management, and cost of service for administrative overheads related to the
borrowing and lending).
2. Ukraine may request the borrowing costs subsidy each year. The Commission may
award the borrowing costs subsidy for an amount not exceeding the limits of the
appropriations made available in the context of the budgetary procedure.
Article 20
Decision on the release of assistance
1. The Commission shall decide on the release of assistance subject to its assessment of the
following requirements:
a. for macro-financial assistance:
i. compliance with the precondition set out in Article 5(1);
ii. the satisfactory fulfilment of the policy conditions set out in the MoU; and
iii. compliance with the Instrument for Coordinated Support to Ukraine
Agreement referred to in Article 17;
b. for assistance to support Ukraine’s defence industrial capacities:
i. compliance with the precondition set out in Article 5(1);
ii. confirmation that the contracts or agreements are for products in compliance
with Article 10 and that the Commission does not object to the methods of
implementation;
EN 40 EN
iii. confirmation that Ukraine broadly respects the qualitative and quantitative
steps contained in the Annex to Council Implementing Decision (EU)
2024/1447 (35) and any amendments thereto;
iv. compliance with the obligations referred to in Article 13 and the Instrument for
Coordinated Support to Ukraine Agreement referred to in Article 17; and
v. to the extent necessary, the adequacy of the detailed justification of Ukraine,
taking into account the situation in Ukraine and the committed and expected
external financing available.
For budget assistance in the form of a loan to be implemented pursuant to Chapter III of
Regulation (EU) 2024/792, the release of assistance shall be implemented in accordance
with Chapter III of Regulation (EU) 2024/792.
2. Subject to compliance with the allocation referred to in Article 4(1), where the
Commission makes a positive assessment of the request for funds, it shall adopt, without
undue delay, a decision authorising the disbursement of the Instrument for Coordinated
Support to Ukraine. For assistance to support Ukraine’s defence industrial capacities,
that amount to be disbursed shall not exceed the value of the contracts or agreements
included in the request for funds.
3. The Commission may proceed with the decision referred to in paragraph 2 for paragraph
1, points (a) and (b), collectively or individually.
4. Where the Commission has sufficient information to partially positively assess the
request for funds and is seeking further justification from Ukraine on the remaining part,
the Commission may proceed with a partial positive assessment of the request for funds
and withhold the release of the remaining part of the instalment until such further
justification is provided.
5. Where the Commission gives a negative assessment to the request for funds, it shall,
without undue delay, inform Ukraine, giving reasons for its assessment. A negative
assessment shall not prevent Ukraine from submitting a new request for funds.
35 Regulation (EU) 2023/2418 of the European Parliament and of the Council of 18 October 2023 on establishing an
instrument for the reinforcement of the European defence industry through common procurement (EDIRPA) (OJ L, 2023/2418, 26.10.2023, ELI: http://data.europa.eu/eli/reg/2023/2418/oj).
EN 41 EN
Article 21
Financing of the Instrument for Coordinated Support to Ukraine
1. In order to finance the assistance under the Instrument for Coordinated Support to
Ukraine, the Commission shall be empowered, on behalf of the Union, to borrow the
necessary funds on the capital markets or from financial institutions under the diversified
funding strategy referred to in Article 224 of Regulation (EU, Euratom) 2024/2509.
2. The borrowing and lending operations for the Instrument for Coordinated Support to
Ukraine shall be carried out in euro.
3. By way of derogation from Article 31(3), second sentence, of Regulation (EU) 2021/947,
the financial assistance provided to Ukraine under the Instrument for Coordinated
Support to Ukraine shall not be supported by the External Action Guarantee. No
provisioning for the Instrument for Coordinated Support to Ukraine shall be constituted
and, by way of derogation from Article 214(1) of Regulation (EU, Euratom) 2024/2509,
no provisioning rate shall be set.
Article 22
Application of the rules on classified information and sensitive information
1. Classified information that is created, handled, stored, exchanged or shared under this
Regulation shall be protected in accordance with, as applicable:
a. the security rules set out in Commission Decision (EU, Euratom) 2015/44436;
b. the Agreement between the Member States of the European Union, meeting within
the Council, regarding the protection of classified information exchanged in the
interests of the Union; or
c. the applicable security agreements and its implementing arrangements, between the
Union and Ukraine.
2. The Commission shall use a secured exchange system in order to facilitate the exchange
of classified information and sensitive information between the Commission and Ukraine
and, where appropriate, with the Member States.
36 Commission Decision (EU, Euratom) 2015/444 of 13 March 2015 on the security rules for protecting EU classified
information (OJ L 72, 17.3.2015, p. 53, ELI: http://data.europa.eu/eli/dec/2015/444/oj).
EN 42 EN
3. The Commission shall have access to information, including classified information,
necessary for the tasks assigned to it under this Regulation, in particular for the purpose
of verifying the conditions for disbursement of payments and carrying out the checks,
reviews, audits, investigations, reports as well as the controls and audits, as referred to in
Article 17.
4. Information received as a result of the application of this Regulation shall be used only
for the purpose for which it was requested.
5. The Commission and Member States shall ensure the protection of trade and business
secrets and other sensitive information acquired and generated in application of this
Regulation in accordance with Union law and respective national law.
CHAPTER V
FINAL PROVISIONS
Article 23
Exercise of the delegation
1. The power to adopt delegated acts is conferred on the Commission subject to the
conditions laid down in this Article.
2. The power to adopt delegated acts referred to in Article 10(10) shall be conferred on the
Commission for an indeterminate period of time from [SEVEN DAYS AFTER THE
ENTRY INTO FORCE OF THIS REGULATION].
3. The delegation of power referred to in Article 10(10) may be revoked at any time by the
European Parliament or by the Council. A decision to revoke shall put an end to the
delegation of the power specified in that decision. It shall take effect on the day
following the publication of the decision in the Official Journal of the European Union
or at a later date specified therein. It shall not affect the validity of any delegated acts
already in force.
4. Before adopting a delegated act, the Commission shall consult experts designated by
each Member State in accordance with the principles laid down in the Interinstitutional
Agreement of 13 April 2016 on Better Law-Making.
EN 43 EN
5. As soon as it adopts a delegated act, the Commission shall notify it simultaneously to the
European Parliament and to the Council.
6. A delegated act adopted pursuant to Article 10(10) shall enter into force only if no
objection has been expressed either by the European Parliament or by the Council within
a period of two months of notification of that act to the European Parliament and the
Council or if, before the expiry of that period, the European Parliament and the Council
have both informed the Commission that they will not object. That period shall be
extended by two months at the initiative of the European Parliament or of the Council.
Article 24
Committee procedure
1. The Commission shall be assisted by a committee of representatives of the Member
States. That committee shall be a committee within the meaning of Regulation (EU) No
182/2011.
2. The EDA shall be invited to provide its views and expertise to the committee as an
observer. The EEAS shall also be invited to assist in the work of the committee.
3. Where reference is made to this paragraph, Article 5 of Regulation (EU) No 182/2011
shall apply.
Article 25
Instrument for Coordinated Support to Ukraine dialogue
1. In order to enhance the dialogue between the Union institutions, in particular the
European Parliament, the Council and the Commission, and to ensure greater
transparency and accountability, the competent committee of the European Parliament
may invite the Commission to discuss the implementation of this Regulation.
2. The European Parliament may express its views in resolutions as regards the Instrument
for Coordinated Support to Ukraine.
3. The Commission shall take into account any elements arising from the views expressed
through the Instrument for Coordinated Support to Ukraine dialogue, including
resolutions from the European Parliament if provided.
EN 44 EN
Article 26
Information to the European Parliament and to the Council
1. The Commission shall regularly review the management and implementation of the loan
and shall inform the European Parliament and the Council of developments regarding the
implementation of this Regulation, including Article 4(3), Article 4(4), Article 8(3),
Article 17(3) and Article 20(2), and shall provide the European Parliament and the
Council with the relevant documents without undue delay. Information transmitted by
the Commission to the Council in the context of this Regulation or its implementation
shall simultaneously be made available to the European Parliament, subject to
confidentiality arrangements if necessary.
2. By 30 December 2028, the Commission shall submit to the European Parliament and to
the Council a report on the implementation of this Regulation, including an evaluation of
that implementation. That report shall:
a. examine progress made in implementing the Instrument for Coordinated Support to
Ukraine;
b. provide information on the monitoring referred to in Article 14; and
c. assess the economic situation and prospects of Ukraine, as well as progress made in
implementing the policy conditions referred to in Article 8(1).
3. By 30 December 2029, the Commission shall submit to the European Parliament and to
the Council an evaluation report, assessing the results and efficiency of the Instrument
for Coordinated Support to Ukraine provided under this Regulation and the extent to
which it has contributed to the aims of the assistance.
Article 27
Amendments to Regulation (EU) 2024/792
Regulation (EU) 2024/792 is amended as follows:
1. Article 6 is amended as follows:
a. in paragraph 2 the following subparagraph is added:
‘Additional financial support pursuant to Chapter III in the form of a loan benefitting from a
financial guarantee pursuant to Article 7(4) shall be progressively available for an amount of
up to EUR 5 billion for the period from 1 January 2024 to 30 June 2028, as guarantees by
EN 45 EN
third countries referred to in Article 8a enter into force in accordance with Article 7(6) and
after the amount referred to in Article 8a(1), point (e), has been in full received by the
Commission, while never exceeding the principal amounts covered by those guarantee
agreements.’;
b. paragraph 3 is replaced by the following:
‘3. The sum of the resources made available pursuant to paragraph 1 and to the first
subparagraph of paragraph 2 shall not exceed EUR 50 000 000 000 for the period 2024 to
2027.’
c. in paragraph 4, the second subparagraph is replaced by the following:
‘Amounts made accessible pursuant to Article 4(1) of Regulation (EU) 2026/467 (*1) and
Article 4(1) of Regulation (EU) [Instrument for Coordinated Support to Ukraine
Regulation](*2) shall be implemented as additional financial support pursuant to Chapter III
of this Regulation in the form of loans. Those amounts shall be in addition to the amounts
referred to in paragraphs 2 and 3 of this Article. Amounts made accessible pursuant to Article
4(1) of Regulation (EU) [Instrument for Coordinated Support to Ukraine] shall be available
until 30 June 2028;’
(*1) Regulation (EU) 2026/467 of the European Parliament and of the Council of 24 February 2026 implementing
enhanced cooperation on the establishment of the Ukraine Support Loan for 2026 and 2027 (OJ L, 2026/467,
26.2.2026, ELI: http://data.europa.eu/eli/reg/2026/467/oj).
(*2) Regulation (EU)… of the European Parliament and of the Council of… on … OJ…’
2. In Article 7, the following paragraphs are added:
‘4. Subject to paragraph 6 of this Article, third countries being provided the highest possible
rating from two or more Credit Rating Agencies registered in the European Union in
accordance with Regulation (EC) 1060/2009, on the date of entry into force of this Regulation
which are listed in the Annex to this Regulation, may provide guarantees in respect of the loan
amount referred to in the second subparagraph of Article 6(2). Such guarantees shall cover in
full the principal, interest and any other amounts, including recovery costs, due by Ukraine
until all liabilities from those loan amounts have been repaid and any amounts related to the
loan amounts covered by the guarantors.
5. Where contributions from third countries are made in accordance with paragraph 4 of this
Article, they shall be provided in the form of irrevocable, unconditional and on demand
EN 46 EN
guarantees by way of a guarantee agreement concluded with the Commission in accordance
with Article 8a.
6. The guarantees shall become effective in respect of each third country as of the date of
entry into force of the guarantee agreement, referred to in Article 8a, between the
Commission and the third country concerned.
7. Where additional loans amounts are available to Ukraine pursuant to second subparagraph
of Article 6(2) and where amounts are made accessible pursuant to Article 4(1) of Regulation
(EU) 2026/467 and Article 4(1) of Regulation (EU) [Instrument for Coordinated Support to
Ukraine], the Ukraine Plan shall be amended in accordance with Article 20 to reflect those
additional amounts. Those amounts may be linked to qualitative and quantitative steps already
included in the Ukraine Plan.
8. Each amount paid to the Commission as a result of a guarantee call on a guarantee provided
under paragraph 4 of this Article and pursuant to Article 8a(1), points (e) and (f), shall
constitute external assigned revenue in accordance with Article 21(2), point (e) of Regulation
(EU, Euratom) 2024/2509 and shall be used, respectively, for the repayment of financial
liabilities arising from the loan subject of the relevant financial guarantee, for the provisioning
and for the borrowing costs subsidy in respect of the loan referred to in the second
subparagraph of Article 6(2).’;
3. The following Article 8a is added:
‘Article 8a – Guarantee agreements
1. The Commission shall conclude a guarantee agreement with each third country (guarantor)
that provides a financial guarantee referred to in Article 7(4). That agreement shall set out the
rules governing the financial guarantee, including:
(a) the obligation to honour guarantee calls made by the Commission in respect of the
principal, interest and other amounts in respect of the relevant loan;
(b) the application of the guarantee to any non-payment by Ukraine, including where the
repayment schedule is changed or a non-payment is expected;
(c) the obligation of the guarantor to remain liable to honour a call even in the event of failure
to honour a previous call;
(d) the reimbursement to the guarantor of amounts subsequently recovered from Ukraine and
attributable to previous guarantee calls;
EN 47 EN
(e) the obligation of the guarantor to pay to the Union provisioning corresponding to the
estimated annual repayment of principal, interest and other amounts outstanding without
undue delay after the entry into force of the guarantee agreement and that any outstanding part
of that amount shall only be repaid by the Union to the third country after all liabilities and
costs from the loan referred to in the second subparagraph of Article 6(2) have been repaid;
(f) if the Union awards, at its sole discretion, the borrowing costs subsidy pursuant to Article
23, the guarantor shall provide contribution fully covering such costs in respect of the loan
amounts referred to in the second subparagraph of Article 6(2) that are covered by its
guarantee, without having the right to reimbursement and recovery of such amounts pursuant
to point (d) of this paragraph;
(g) other payment conditions.
2. The Commission shall inform the European Parliament and the Council simultaneously and
without delay of the guarantee agreements concluded.’;
4. In Article 19, paragraph 2 point (f) is replaced by the following:
‘(f) the indicative time limit, which shall expire no later than 31 December 2027, by which the
final qualitative and quantitative steps for both investment projects and reforms must be
completed, without prejudice to Article 26;’;
5. Article 22 is amended as follows:
a. in paragraph 2, the second subparagraph is replaced by the following:
‘Upon adoption of the Council implementing decision referred to in Article 19(1) of this
Regulation in respect of the amounts referred to in second subparagraph of Article 6(4) of this
Regulation, the Commission shall enter into an amendment or addendum to the loan
agreement with Ukraine referred to in the first subparagraph of this paragraph with the
purpose of ensuring the implementation of the amounts pursuant to Chapter III of this
Regulation, with the exception of rules on the duration and repayment of the loan, including
borrowing cost subsidy, which shall be governed by Regulation (EU) 2026/467 and
Regulation (EU) [Instrument for Coordinated Support to Ukraine Regulation] for the
respective amounts.’;
b. paragraph 4 is replaced by the following:
EN 48 EN
‘4. In respect of the loan amount referred to in the first subparagraph of Article 6(2) of this
Regulation, no provisioning shall be constituted and by way of derogation from Article 214(1)
of Regulation (EU, Euratom) 2024/2509, no provisioning rate as a percentage shall be set.
In respect of the loan amount referred to in the second subparagraph of Article 6(2) of this
Regulation, by derogation from Article 214(2) of Regulation (EU, Euratom) 2024/2509,
provisioning corresponding to the estimated annual repayment of principal, interest and other
amounts outstanding shall be kept in the Common Provisioning Fund. Such provisioning shall
be constituted from the contribution referred to in Article 8a(1), point (e), and shall solely be
used in respect of that loan.’;
c. paragraph 6 is added:
‘6. For loans benefiting from a financial guarantee provided pursuant to Article 7(4), the
Commission shall conclude a separate loan agreement with Ukraine or enter into an
amendment or addendum to the loan agreement with Ukraine referred to in the first
subparagraph of paragraph 2 with the purpose of ensuring the implementation of the amounts
pursuant to Chapter III of this Regulation. In the case of such an amendment or addendum,
the additional amount shall be made available to Ukraine subject to the entry into force of the
guarantee agreements referred to in Article 8a, and subject to limits set out in Article 6(2).’;
6. In Article 23, paragraph 1 is replaced by the following:
‘1. By way of derogation from Article 223(4) of Regulation (EU, Euratom) 2024/2509 and
subject to available resources, the Facility may bear the cost of funding, cost of liquidity
management, and cost of service for administrative overheads related to the borrowing and
lending (“borrowing costs subsidy”), except for costs related to early repayment of the loan
and except for amounts made accessible pursuant to Article 4(1) of Regulation (EU) 2026/467
and Article 4(1) of Regulation (EU) [Instrument for Coordinated Support to Ukraine
Regulation]. For the period from 1 January 2024 to 31 December 2027, the borrowing costs
subsidy shall be covered under Chapter V of this Regulation.
By derogation from Article 111(2) of Regulation (EU, Euratom) 2024/2509, the legal
commitment for the coverage of borrowing costs of the loan amounts referred to in the second
subparagraph of Article 6(2) may be taken without prior making of the budgetary
commitment, provided that the amounts of provisioning paid pursuant to Article 8a(e) are
sufficient to cover those costs.’.
7. The following Annex is added:
EN 49 EN
‘ANNEX
Third countries eligible to provide guarantees pursuant to Article 7(4):
- Australia
- Canada
- Liechtenstein
- Norway
- Singapore
- Switzerland’
Article 28
Amendments to Regulation (EU) 2024/2773
Regulation (EU) 2024/2773 is amended as follows:
1. Article 2 is amended as follows:
(a) the following points are inserted:
‘(3a) ‘eligible second-generation ERA loan’ means a second-generation ERA loan approved
as eligible under the Mechanism by the Commission, the Ukraine Support Loan and the
Instrument for Coordinated Support to Ukraine;
(3b) ‘Instrument for Coordinated Support to Ukraine’ means the loan provided by the Union
to Ukraine pursuant to Regulation (EU) [Instrument for Coordinated Support to Ukraine
Regulation];
(3c) ‘second-generation ERA loan’ means a loan given directly or indirectly by a third
country as a bilateral lender to the benefit of Ukraine, where that bilateral lender had
previously provided an eligible bilateral loan under the auspices of the G7 ‘Extraordinary
Revenue Acceleration Loans for Ukraine’ initiative;
(b) the following point is added:
(7) ‘Ukraine Support Loan’ means the loan provided by the Union to Ukraine pursuant to
Regulation (EU) 2026/467.’;
2. Article 3 is replaced by the following:
‘Article 3
EN 50 EN
Purpose
The purpose of the Mechanism shall be to provide Ukraine with non-repayable financial
support with a view to assisting Ukraine to repay the MFA Loan, eligible bilateral loans and
eligible second-generation ERA loans. To achieve that purpose, the Mechanism shall receive
resources and disburse them on a regular basis to Ukraine to cover the principal, interest and
any other related costs of the MFA Loan and eligible bilateral loans and the principal of
eligible second-generation ERA loans. In its operations, the Mechanism shall ensure equal
access both for bilateral lenders and for the Union.’;
3. Article 5 is replaced by the following:
‘Article 5
Available support
1. The non-repayable financial support under the Mechanism shall be available under the
conditions set out in Articles 6, 6a, 7 and 8 to assist Ukraine to repay:
a. the principal, interest and any other related costs of:
i. the MFA Loan; and
ii. eligible bilateral loans.
b. the principal of eligible second-generation ERA loans.
2. The non-repayable financial support under the Mechanism shall be allocated to assist
Ukraine to repay the MFA Loan and eligible bilateral loans referred to in paragraph 1 in
proportion to the principal of each loan expressed in euro against the sum of the principal
of the MFA Loan and all eligible bilateral loans expressed in euro.
That allocation shall be adjusted:
a. once the MFA Loan has been fully repaid by Ukraine, including interest and any
other related costs, where the non-repayable financial support under the Mechanism
shall be allocated to assist Ukraine to repay the Ukraine Support Loan and
Instrument for Coordinated Support to Ukraine, jointly replacing the MFA Loan in
the allocation. For the purposes of the allocation, the principal of the MFA loan
shall continue to determine the share which shall be allocated for the repayment of
Ukraine Support Loan and Instrument for Coordinated Support to Ukraine jointly;
and
EN 51 EN
b. once an eligible bilateral loan has been fully repaid by Ukraine, including interest
and any other related costs, where the non-repayable financial support under the
Mechanism shall be allocated to assist Ukraine to repay any eligible second-
generation ERA loan, replacing the eligible bilateral loan provided by the same
bilateral lender in the allocation. For the purposes of the allocation, the principal of
the eligible bilateral loan provided by the same bilateral lender as set out in the
Commission implementing decision referred to in Article 6(5), point (b), shall
continue to determine the share which shall be allocated for the repayment of
eligible second-generation ERA loan.
Once the MFA Loan or an eligible bilateral loan has been fully repaid by Ukraine,
including interest and any other related costs, and, where relevant, any eligible second
generation ERA loan as a replacement thereof in the allocation in accordance with this
paragraph has been fully repaid, its allocation shall be redistributed so that any future
resources under the Mechanism are allocated to remaining loans. For this purpose, the
shares in the allocation to be redistributed shall be determined using the principal amount
of the:
a. MFA loan and eligible bilateral loans until all such loans are fully repaid;
b. eligible second-generation ERA loans after the MFA loan and all eligible bilateral
loans have been fully repaid.
3. The Commission shall adopt a decision establishing the allocation provided for in
paragraph 2 of this Article between the MFA Loan and eligible bilateral loans. The
Commission shall use the principal of each eligible bilateral loan expressed in euro as
referred to in Article 6(5), point (b). The Commission shall without delay amend that
decision to include each bilateral loan upon the entry into force of that loan. The
Commission may amend that decision to proportionally reduce the allocation to a
bilateral loan should that bilateral loan not be fully disbursed by 31 December 2027 and
shall amend that decision if the allocation is adjusted in accordance with paragraph 2.
4. The overall amount of the principal of the MFA Loan and eligible bilateral loans referred
to in paragraph 1 shall not exceed EUR 45 billion.
5. The non-repayable financial support under the Mechanism shall be carried out in euro.
6. All payments shall be subject to the availability of the resources referred to in Article
4(1).
EN 52 EN
7. The Union shall not assume any liability for the repayment of eligible bilateral loans or
eligible second-generation ERA loans approved as eligible under the Mechanism by the
Commission.’;
4. the following Article 6a is inserted:
‘Article 6a
Commission implementing decision on the eligibility of the second-generation ERA loans
1. If Ukraine wishes to request support under the Mechanism to assist it to repay a second-
generation ERA loan, it shall submit the text of the relevant bilateral loan agreement to
the Commission.
2. The Commission shall without delay assess the eligibility of second-generation ERA
loans under the Mechanism in accordance with the following criteria:
a. the second-generation ERA loan is a loan that is concessional towards Ukraine to a
degree materially similar to the Instrument for Coordinated Support to Ukraine;
b. the second-generation ERA loan is of an amount that ensures fair burden sharing
between the Union and the bilateral lender;
c. the counterparty to the second-generation ERA loan had previously provided an
eligible bilateral loan acting under the auspices of the G7 ‘Extraordinary Revenue
Acceleration Loans for Ukraine’ initiative; and
d. the second-generation ERA loan is to be fully disbursed to the benefit of Ukraine
before 31 December 2028; such disbursements may be linked to the completion of
policy conditions.
For the purposes of the assessment, the Commission may seek additional information
from Ukraine.
3. A suspensive condition in a second-generation ERA loan agreement that provides that
such agreement does not enter into force before the approval by the Commission of the
eligibility of the second-generation ERA loan shall not prevent a positive assessment by
the Commission of the second-generation ERA loan.
4. The Commission shall approve the eligibility of a second-generation ERA loan by means
of an implementing decision.
EN 53 EN
5. The Commission implementing decision referred to in paragraph 4 of this Article shall
set out:
a. the bilateral lender;
b. the principal of the second-generation ERA loan expressed in euro; to the extent
necessary, the principal of the second-generation ERA loan shall also be expressed
in the currency of the respective second-generation ERA loan;
c. the justification for the positive assessment of the second-generation ERA loan.
6. The Commission may repeal the implementing decision referred to in paragraph 4 of this
Article if the relevant second-generation ERA loan agreement does not enter into force
by 30 June 2028.
7. In the case of a negative assessment of the second-generation ERA loan, the Commission
shall communicate that assessment to Ukraine, giving reasons for its assessment.’;
5. In Article 7, paragraph 2 is replaced by the following:
‘2. The ULCM Agreement shall contain in particular the following elements:
a. the obligation of Ukraine to use the non-repayable financial support under the
Mechanism for the repayment of the principal, interest and any other related costs of
the MFA Loan or eligible bilateral loans and the principal of the eligible second-
generation ERA loans;
b. the bank account details of all bilateral lenders to which payments of the non-
repayable financial support under the Mechanism related to their respective bilateral
loans and second-generation ERA loans shall be made by the Commission;
c. for payments of the non-repayable financial support under the Mechanism related to
the MFA Loan, Ukraine Support Loan and Instrument for Coordinated Support to
Ukraine, provisions ensuring that the Union shall use those amounts to directly
repay those loans;
d. dedicated provisions reflecting Article 5(7) and ensuring that the Union shall not be
held liable for any damage caused by Ukraine or by any third parties in the
implementation of eligible bilateral loans or eligible second-generation ERA loans,
including as a consequence of the implementation of the Mechanism, and
specifically where the amounts referred to in Article 4(1) vary over time or cease;
EN 54 EN
e. the obligation of Ukraine to obtain from the bilateral lenders and provide, without
delay, the Commission with proof of:
i. the entry into force of each bilateral loan agreement and second-generation
ERA agreement; and
ii. the discharge of each repayment obligation, including, to the extent necessary,
the applicable conversion rate used;
f. the obligation of Ukraine to agree with each bilateral lender that any amounts
provided by Ukraine to a bilateral lender to repay the bilateral loan that do not
immediately discharge repayment obligations, shall remain available until such time
as the repayment obligations fall due, with any interest accrued on that amount also
available to be used to discharge obligations under the bilateral loan agreement;
g. the obligation of Ukraine to accompany each payment request with:
i. details of the remaining amounts due under each bilateral loan agreement and
second-generation ERA loan agreement; and
ii. details of the amounts that are available to discharge repayment obligations
referred to in point (f);
h. an express authorisation for bilateral lenders to exceptionally make a request for
payment pursuant to Article 8(6), provided that the information referred to in point
(g) of this paragraph is submitted by the bilateral lenders; and
i. any other requirements needed for the implementation of the Mechanism.’;
6. in Article 8, paragraphs 1, 2 and 3 are replaced by the following:
‘1. Ukraine may submit to the Commission twice a year a request for non-repayable
financial support under the Mechanism in respect of the MFA Loan, eligible
bilateral loans and eligible second-generation ERA loans.’;
‘2. The Commission shall assess Ukraine’s request for non-repayable financial
support under the Mechanism on the basis of the following requirements:
(a) compliance with the precondition set out in Article 11(1), which shall only be
applicable as regards the MFA Loan, Ukraine Support Loan and Instrument for
Coordinated Support to Ukraine;
EN 55 EN
(b) confirmation that the total value of disbursements in respect of the MFA Loan
or each eligible bilateral loan, together with any interest accrued thereon, or eligible
second-generation ERA loan, does not exceed the total amount due to that bilateral
lender; and
(c) compliance with the obligations of the ULCM Agreement.’;
‘3. Subject to the availability of the resources referred to in Article 4(1), where the
Commission makes a positive assessment of the request for non-repayable financial
support under the Mechanism, it shall adopt without undue delay a decision
authorising the disbursement of the non-repayable financial support under the
Mechanism, including the amount disbursed to support the repayment of each loan
covered by the Mechanism. The amount disbursed under the Mechanism shall equal
the amount of resources available on the basis of Article 4(1). That amount
disbursed shall be allocated in accordance with the Commission decision referred to
in Article 5(3).’;
7. Article 17 is amended as follows:
a. paragraph 1 is replaced by the following:
‘1. The Commission shall inform the European Parliament and the Council of
developments regarding the implementation of this Regulation, including Article
5(3), Article 6(4) and (8), Article 6a(4) and (8), Article 7(1), Article 8(3) and (5),
Article 11(2) and (5), Article 13(2) and Article 15(1), disbursements under the
Mechanism and the MFA Loan, and shall provide those institutions with the
relevant documents in due time. That information shall be provided in accordance
with the interinstitutional arrangements agreed under the Ukraine Facility, including
the Ukraine Facility Dialogue.’;
b. in paragraph 2, the second subparagraph is replaced by the following:
‘Where appropriate, in particular after the MFA Loan, all eligible bilateral loan
agreements and all eligible second-generation ERA loan agreements have expired,
the Commission shall include in the report referred to in the first subparagraph a
review of the adequacy of the arrangements contained in this Regulation.’.
EN 56 EN
Article 29
Entry into force
This Regulation shall enter into force on the day following that of its publication in the
Official Journal of the European Union.
This Regulation shall be binding in its entirety and directly applicable in the Member
States in accordance with the Treaties.
Done at Brussels,
For the European Parliament For the Council
The President The President
EN 57 EN
LEGISLATIVE FINANCIAL AND DIGITAL STATEMENT
1. FRAMEWORK OF THE PROPOSAL/INITIATIVE ................................................. 3
1.1. Title of the proposal/initiative ...................................................................................... 3
1.2. Policy area(s) concerned .............................................................................................. 3
1.3. Objective(s) .................................................................................................................. 3
1.3.1. General objective(s) ..................................................................................................... 3
1.3.2. Specific objective(s) ..................................................................................................... 3
1.3.3. Expected result(s) and impact ...................................................................................... 3
1.3.4. Indicators of performance ............................................................................................ 3
1.4. The proposal/initiative relates to: ................................................................................. 4
1.5. Grounds for the proposal/initiative .............................................................................. 4
1.5.1. Requirement(s) to be met in the short or long term including a detailed timeline for
roll-out of the implementation of the initiative ............................................................ 4
1.5.2. Added value of EU involvement (it may result from different factors, e.g.
coordination gains, legal certainty, greater effectiveness or complementarities). For
the purposes of this section 'added value of EU involvement' is the value resulting
from EU action, that is additional to the value that would have been otherwise
created by Member States alone. ................................................................................. 4
1.5.3. Lessons learned from similar experiences in the past .................................................. 4
1.5.4. Compatibility with the multiannual financial framework and possible synergies with
other appropriate instruments ....................................................................................... 5
1.5.5. Assessment of the different available financing options, including scope for
redeployment ................................................................................................................ 5
1.6. Duration of the proposal/initiative and of its financial impact .................................... 6
1.7. Method(s) of budget implementation planned ............................................................. 6
2. MANAGEMENT MEASURES................................................................................... 8
2.1. Monitoring and reporting rules .................................................................................... 8
2.2. Management and control system(s) ............................................................................. 8
2.2.1. Justification of the budget implementation method(s), the funding implementation
mechanism(s), the payment modalities and the control strategy proposed .................. 8
2.2.2. Information concerning the risks identified and the internal control system(s) set up
to mitigate them............................................................................................................ 8
2.2.3. Estimation and justification of the cost-effectiveness of the controls (ratio between
the control costs and the value of the related funds managed), and assessment of the
expected levels of risk of error (at payment & at closure) ........................................... 8
2.3. Measures to prevent fraud and irregularities ................................................................ 9
3. ESTIMATED FINANCIAL IMPACT OF THE PROPOSAL/INITIATIVE ............ 10
3.1. Heading(s) of the multiannual financial framework and expenditure budget line(s)
affected ....................................................................................................................... 10
EN 58 EN
3.2. Estimated financial impact of the proposal on appropriations ................................... 12
3.2.1. Summary of estimated impact on operational appropriations.................................... 12
3.2.1.1. Appropriations from voted budget ............................................................................. 12
3.2.1.2. Appropriations from external assigned revenues ....................................................... 17
3.2.2. Estimated output funded from operational appropriations......................................... 22
3.2.3. Summary of estimated impact on administrative appropriations ............................... 24
3.2.3.1. Appropriations from voted budget .............................................................................. 24
3.2.3.2. Appropriations from external assigned revenues ....................................................... 24
3.2.3.3. Total appropriations ................................................................................................... 24
3.2.4. Estimated requirements of human resources.............................................................. 25
3.2.4.1. Financed from voted budget....................................................................................... 25
3.2.4.2. Financed from external assigned revenues ................................................................ 26
3.2.4.3. Total requirements of human resources ..................................................................... 26
3.2.5. Overview of estimated impact on digital technology-related investments ................ 28
3.2.6. Compatibility with the current multiannual financial framework.............................. 28
3.2.7. Third-party contributions ........................................................................................... 28
3.3. Estimated impact on revenue ..................................................................................... 29
4. DIGITAL DIMENSIONS .......................................................................................... 29
4.1. Requirements of digital relevance .............................................................................. 30
4.2. Data ............................................................................................................................ 30
4.3. Digital solutions ......................................................................................................... 31
4.4. Interoperability assessment ........................................................................................ 31
4.5. Measures to support digital implementation .............................................................. 32
EN 59 EN
1. FRAMEWORK OF THE PROPOSAL/INITIATIVE
1.1. Title of the proposal/initiative
Proposal for a Regulation of the European Parliament and of the Council on the
establishment of the Instrument for Coordinated Support to Ukraine for 2027 and
amending Regulations (EU) 2024/792 and (EU) 2024/2773.
1.2. Policy area(s) concerned
Economic and Financial Affairs as well as support to the Defence Industry.
1.3. Objective(s)
1.3.1. General objective(s)
To establish the Instrument for Coordinated Support to Ukraine and make available
to Ukraine financial and economic assistance with a view to supporting Ukraine in
covering its financing needs for 2027 notably resulting from Russia’s war of
aggression and Russia’s non-payment of reparations due. The Instrument for
Coordinated Support to Ukraine shall provide financial and economic assistance to
Ukraine in a predictable, continuous, orderly, flexible and timely manner.
Furthermore, to work with like-minded partners in the implementation of the
Instrument for Coordinated Support to Ukraine to address Ukraine’s financing needs.
1.3.2. Specific objective(s)
To support macro-financial stability in Ukraine by easing its external and internal
financing constraints, and to support Ukraine’s defence industrial capacities through
economic, financial and technical cooperation.
1.3.3. Expected result(s) and impact
Specify the effects which the proposal/initiative should have on the beneficiaries/groups targeted.
Ukraine will be provided with sufficient and continuous financial support for 2027 in
response to and following the worsening needs. The Instrument for Coordinated
Support to Ukraine is expected to help support Ukraine’s budgetary and defence
needs for the immediate future. The amendments to the Ukraine Loan Cooperation
Mechanism are expected to support Ukraine in the repayment of the loan provided
under this Regulation and other eligible second-generation ERA loans. The
amendments to the Ukraine Facility are expected to result in an addition EUR 5
billion of support to Ukraine.
1.3.4. Indicators of performance
Specify the indicators for monitoring progress and achievements.
The authorities of Ukraine will be required to regularly report on the implementation
of previously granted assistance under the Instrument for Coordinated Support to
Ukraine. The Commission services will remain in close contact with the Ukraine
Donor Platform to benefit from insights from ongoing activities of the respective
donors.
As regards the objective on easing financing constraints, the authorities of Ukraine
will be required to provide a report on the compliance with the agreed policy
conditions ahead of the disbursement of the instalment of the macro-financial
assistance. The Commission services will continue to monitor public finance
EN 60 EN
management, following the operational assessment of the financial circuits and
administrative procedures in Ukraine, which was delivered in March 2026.
An annual report on the implementation of this Regulation to the European
Parliament and Council is foreseen. An ex-post evaluation of the Instrument for
Coordinated Support to Ukraine will be carried out by the Commission.
1.4. The proposal/initiative relates to:
☒a new action
¨a new action following a pilot project / preparatory action37
¨the extension of an existing action
¨a merger or redirection of one or more actions towards another/a new action
1.5. Grounds for the proposal/initiative
1.5.1. Requirement(s) to be met in the short or long term including a detailed timeline for
roll-out of the implementation of the initiative
For the implementation of the Instrument for Coordinated Support to Ukraine, the
Commission will enter into a Instrument for Coordinated Support to Ukraine
Agreement with Ukraine detailing the financial terms of the Instrument for
Coordinated Support to Ukraine.
Once the Instrument for Coordinated Support to Ukraine Agreement is in place, for
budget assistance, a memorandum of understanding (MoU) must be agreed between
the Commission and the authorities of Ukraine for macro-financial assistance and the
Ukraine Plan updated under the Ukraine Facility. Disbursements will then be
conditional upon relevant conditions for both budget assistance and assistance to
support Ukraine’s defence industrial capacities.
The Instrument for Coordinated Support to Ukraine will be managed by the
Commission. Specific provisions on the prevention of fraud and other irregularities,
consistent with the Financial Regulation, are applicable, including the relevant
provisions on ensuring the Union’s financial interest as laid down in the Framework
Agreement under Regulation (EU) 2024/792. The Commission and the Ukrainian
authorities would agree on the MoU setting out reporting requirements.
1.5.2. Added value of EU involvement (it may result from different factors, e.g.
coordination gains, legal certainty, greater effectiveness or complementarities). For
the purposes of this section 'added value of EU involvement' is the value resulting
from EU action, that is additional to the value that would have been otherwise
created by Member States alone.
Reasons for action at EU level (ex-ante): This proposal responds to the need for a
common response in providing support to Ukraine on an adequate scale, which
cannot be sufficiently achieved by the Member States alone and can be better
achieved by the EU. The main reasons are the fiscal capacity and budgetary
constraints faced at the national level and the need for strong coordination in order to
maximise the scale and effectiveness of the support, while limiting the burden on the
37 As referred to in Article 58(2), point (a) or (b) of the Financial Regulation.
EN 61 EN
administrative capacity of Ukrainian authorities, which is very stretched in the
current circumstances.
The initiative is part of the EU’s objective to provide support to Ukraine and
reinforces actions by the Union for economic and defence support, as well as the
Union’s initiatives to coordinate multilateral actions.
Expected generated EU added value (ex-post): The expected EU added value,
notably in comparison to other EU instruments, is to swiftly support macro-financial
stability via easing Ukraine’s external and internal financing constraints and to
support Ukraine’s defence industrial capacities - within an appropriate framework for
reporting requirements.
1.5.3. Lessons learned from similar experiences in the past
Previous macro-financial assistance operations to Ukraine are subject to ex-post
evaluation. Past ex-post evaluations of previous macro-financial assistance
operations to Ukraine have shown that in general they were highly relevant in terms
of its objectives, budget and policy objectives. They proved crucial to support
Ukraine in addressing its balance-of-payment problems and implementing key
structural reforms to stabilise the economy and enhance the sustainability of its
external position. They allowed for fiscal savings and financial benefits, as well as
acted as a catalyst for additional financial support and investor confidence.
1.5.4. Compatibility with the multiannual financial framework and possible synergies with
other appropriate instruments
The resources for the Instrument for Coordinated Support to Ukraine will be
financed by borrowing under the diversified funding strategy referred to in Article
224 of Regulation (EU, Euratom) 2024/2509. In considering the financial risks and
the budgetary coverage, no provisioning should be constituted for the support in the
form of loans under this Regulation, to be guaranteed over and above the ceilings,
and, by way of derogation from Article 214(1) of Regulation (EU, Euratom)
2024/2509, no provisioning rate should be set.
With a view to providing support to Ukraine on a highly concessional basis, the
Union may decide to provide a subsidy for the costs in respect of the funds borrowed
in capital markets for loans to Ukraine. These costs include debt service costs (cost
of funding and costs of issuing and managing liquidity) and the associated
administrative costs. These costs are expected to start being invoiced as of the next
multiannual financial framework, starting in 2028, and should be financed over and
above the MFF ceilings through a dedicated special instrument.
The amendments to the Ukraine Facility are expected to result in up to EUR 5 billion
of additional support to Ukraine in the form of loans. The third countries
provisioning, which shall be kept in the Common Provisioning Fund, and the
contribution to cover the borrowing cost subsidy, in case the Union awards it, shall
constitute external assigned revenue.
1.5.5. Assessment of the different available financing options, including scope for
redeployment
By using loans, this operation increases the effectiveness of the EU budget through
the leverage effect and provides for the best cost-efficient option. The Commission
would be empowered to borrow funds from capital markets on behalf of both the
European Union and Euratom using the guarantee of the EU budget. The aim is to
EN 62 EN
obtain funds from the market at the best available rates due to the Union’s top credit
status.
Further pressure on a strained EU budget due to provisioning requirements and
complex arrangements, involving a multitude of ad hoc national guarantees, should
be avoided. Therefore, the loan would be guaranteed over and above the MFF
ceilings. A unified and efficient system to secure the best borrowing conditions and
extend market access for loan support has major advantages in the current market
context.
EN 63 EN
1.6. Duration of the proposal/initiative and of its financial impact
☒limited duration
– ☒ financial impact for 2027 for commitment appropriations and from 2027 to
2028 for payment appropriations.
In addition, the Union may decide to provide a subsidy for the costs in respect
of the funds borrowed in capital markets for this loan to Ukraine. These costs
are expected to start being invoiced as of the next multiannual financial
framework, starting in 2028, and should be financed over and above the MFF
ceilings through a dedicated special instrument.
unlimited duration
1.7. Method(s) of budget implementation planned
☒Direct management by the Commission
– ☒ by its departments, including by its staff in the Union delegations;
– by the executive agencies
Shared management with the Member States
Indirect management by entrusting budget implementation tasks to:
– third countries or the bodies they have designated
– international organisations and their agencies (to be specified)
– the European Investment Bank and the European Investment Fund
– bodies referred to in Articles 70 and 71 of the Financial Regulation
– public law bodies
– bodies governed by private law with a public service mission to the extent that
they are provided with adequate financial guarantees
– bodies governed by the private law of a Member State that are entrusted with
the implementation of a public-private partnership and that are provided with
adequate financial guarantees
– bodies or persons entrusted with the implementation of specific actions in the
common foreign and security policy pursuant to Title V of the Treaty on
European Union, and identified in the relevant basic act
– bodies established in a Member State, governed by the private law of a
Member State or Union law and eligible to be entrusted, in accordance with
sector-specific rules, with the implementation of Union funds or budgetary
guarantees, to the extent that such bodies are controlled by public law bodies or
by bodies governed by private law with a public service mission, and are provided
with adequate financial guarantees in the form of joint and several liability by the
controlling bodies or equivalent financial guarantees and which may be, for each
action, limited to the maximum amount of the Union support.
Comments
N/A
EN 64 EN
2. MANAGEMENT MEASURES
2.1. Monitoring and reporting rules
The monitoring and reporting obligations under Regulation (EU, Euratom)
2024/2509 apply.
The monitoring of the action by the Commission services will take place based on
the implementation of previously granted assistance under the Instrument for
Coordinated Support to Ukraine.
Furthermore, the monitoring of the action will take into consideration the specific
measures to be agreed with the Ukrainian authorities in the MoU. The Commission
will verify the fulfilment of the policy conditions set out in the MoU. The
Commission will inform the European Parliament and the Council about the results
of that verification.
Finally, the monitoring of the action will take into consideration the engagement with
the Ukrainian authorities, including the respective requests for funds and the
information contained therein, regarding the assistance to support Ukraine’s defence
industrial capacities.
In order to ensure that the European Parliament and the Council are able to follow
the implementation of this Regulation, the Commission should regularly inform them
of developments relating to Union assistance to Ukraine under this Regulation and
provide them with the relevant documents.
The Commission should regularly review the adequacy of such reporting and
monitoring requirements and report to the European Parliament and to the Council
thereon, thereby guaranteeing transparency and accountability.
No later than 30 June 2029, the Commission will submit to the European Parliament
and to the Council an ex-post evaluation report, assessing the results and efficiency
of the Instrument for Coordinated Support to Ukraine provided under this Regulation
and the extent to which it has contributed to the aims of the assistance.
2.2. Management and control system(s)
2.2.1. Justification of the budget implementation method(s), the funding implementation
mechanism(s), the payment modalities and the control strategy proposed
The actions to be financed under this proposal will be implemented under direct
management by the Commission. The financial support under the Instrument for
Coordinated Support to Ukraine will be made available by the Commission. The
release of funds can be organised swiftly to start in the course of 2027 and be
completed in 2028 at the latest.
2.2.2. Information concerning the risks identified and the internal control system(s) set up
to mitigate them
The Commission shall have access to information, including classified information,
strictly necessary for the tasks assigned to it under this Regulation, in particular for
the purpose of verifying the conditions for disbursement of payments and carrying
out the checks, reviews, audits, investigations, reports as well as the controls and
audits, as referred to in Article 17.
EN 65 EN
To protect the Union’s financial interests linked to the Instrument for Coordinated
Support to Ukraine, the Instrument for Coordinated Support to Ukraine Agreement to
be concluded between the Commission and the Ukrainian authorities should contain
provisions aligned with the rights, responsibilities and obligations provided for in the
framework agreement under the Ukraine Facility. Ukraine will utilise the same
management and control systems as proposed in the Ukraine Plan established under
Regulation (EU) 2024/792.
Ukraine will be required to provide monthly reports providing information covering
all payments. It will open special accounts for the sole purpose of the management of
the financial and economic assistance received to support Ukraine’s defence
industrial capacities. All payments of the contracts or agreements that are requested
for assistance to support Ukraine’s defence industrial capacities will be paid from
these accounts. The Commission will be granted monitoring rights of these accounts.
Additionally, if it has been established that Ukraine has engaged in acts of fraud,
corruption or other illegal activity with respect to the management of the Instrument
for Coordinated Support to Ukraine, to the detriment of the Union’s financial
interests, the Union can demand early repayment of the Instrument for Coordinated
Support to Ukraine.
In order to address the risks related to information confidentiality, classified
information that is created, handled, stored, exchanged or shared under this
Regulation should be protected in accordance with the security rules set out in
Commission Decision (EU, Euratom) 2015/444, the Agreement between the Member
States of the European Union, meeting within the Council, regarding the protection
of classified information exchanged in the interests of the European Union or the
applicable security agreements and its implementing arrangements, between the
Union and Ukraine, as appropriate. The Commission should use a secured exchange
system in order to facilitate the exchange of classified information and sensitive
information between the Commission and Ukraine and, where appropriate, with the
Member States.
2.2.3. Estimation and justification of the cost-effectiveness of the controls (ratio
between the control costs and the value of the related funds managed), and
assessment of the expected levels of risk of error (at payment & at closure)
The control systems in place have ensured an effective error rate for the macro-
financial assistance type of payments so far of 0%. There are no known cases of
fraud, corruption or illegal activity. Operations have a clear intervention logic, one
that allows the Commission to evaluate their impact. The controls enable the
confirmation of assurance and of attainment of policy objectives and priorities.
Measures to prevent fraud and irregularities
The Instrument for Coordinated Support to Ukraine Agreement to be concluded
between the Commission and the Ukrainian authorities will require that Ukraine
utilises the same management and control systems as proposed in the Ukraine Plan
established under Regulation (EU) 2024/792 that entered into force on 20 June 2024
to ensure that the Union’s financial interests linked to the Instrument for Coordinated
Support to Ukraine are protected efficiently, providing the appropriate measures
relating to the prevention of, and fight against, fraud, corruption and any other
irregularities linked to the assistance. It will also, in accordance with the Financial
Regulation, grant the necessary rights and access to the Commission, the European
EN 66 EN
Anti-Fraud Office (OLAF), the European Court of Auditors and, where applicable,
the European Public Prosecutor’s Office, including from third parties involved in the
implementation of Union funds during and after the availability period of the
Instrument for Coordinated Support to Ukraine. Ukraine should also report
irregularities in relation to the use of the funds to the Commission, in line with the
procedures provided for in the framework agreement under the Ukraine Facility.
EN 67 EN
3. ESTIMATED FINANCIAL IMPACT OF THE PROPOSAL/INITIATIVE
3.1. Heading(s) of the multiannual financial framework and expenditure budget
line(s) affected
• Existing budget lines
In order of multiannual financial framework headings and budget lines.
Heading of
multiannual
financial
framework
Budget line Type of
expenditure Contribution
Number
Diff./Non-
diff.38
from
EFTA
countries 39
from
candidate
countries
and
potential
candidates 40
From
other
third
countries
other assigned
revenue
2.2 Support expenditure for borrowing and
debt management activities of the
European Union
Non-diff. NO NO NO NO
• New budget lines requested
In order of multiannual financial framework headings and budget lines.
Over and
above MFF
ceilings
Budget line Type of
expenditure Contribution
Number
Diff./Non-
diff.
from
EFTA
countries
from
candidate
countries
and
potential
candidates
from
other
third
countries
other assigned
revenue
O Instrument for Coordinated Support to
Ukraine Diff. NO NO NO YES
O Debt service cost of Instrument for
Coordinated Support to Ukraine Diff. NO NO NO YES
38 Diff. = Differentiated appropriations / Non-diff. = Non-differentiated appropriations. 39 EFTA: European Free Trade Association. 40 Candidate countries and, where applicable, potential candidates from the Western Balkans.
EN 68 EN
3.2. Estimated financial impact of the proposal on appropriations
3.2.1. Summary of estimated impact on operational appropriations
– The proposal/initiative does not require the use of operational appropriations
– The proposal/initiative requires the use of operational appropriations, as explained below
3.2.1.1. Appropriations from voted budget
EUR million (to three decimal places)
Heading of multiannual financial framework Number
DG: <…….> Year Year Year Year TOTAL MFF
2021-2027 2024 2025 2026 2027
Operational appropriations
Budget line Commitments (1a) 0.000
Payments (2a) 0.000
Budget line Commitments (1b) 0.000
Payments (2b) 0.000
Appropriations of an administrative nature financed from the envelope of specific programmes 16 01 06 03 Support expenditure for the
Ukraine Facility (3) 0.138 0.138
TOTAL appropriations
for DG <…….>
Commitments =1a+1b+3 0.000 0.000 0.138 0.138
Payments =2a+2b+3 0.000 0.000 0.138 0.138
Year Year Year Year TOTAL MFF
2021-2027 2024 2025 2026 2027
TOTAL operational appropriations
Commitments (4) 0.000
Payments (5) 0.000
EN 69 EN
TOTAL appropriations of an administrative nature financed
from the envelope for specific programmes (6) 0.000 0.000 0.138 0.138
TOTAL appropriations under
HEADING <….> Commitments =4+6 0.000 0.000 0.138 0.138
of the multiannual financial framework Payments =5+6 0.000 0.000 0.138 0.138
Year Year Year Year TOTAL MFF
2021-2027 2024 2025 2026 2027
• TOTAL operational appropriations (all
operational headings)
Commitments (4) 0.000 0.000 0.000 0.000 0.000
Payments (5) 0.000 0.000 0.000 0.000 0.000
• TOTAL appropriations of an administrative nature financed
from the envelope for specific programmes (all operational
headings)
(6) 0.000 0.000 0.000 0.138 0.138
TOTAL appropriations Under
Heading 1 to 6 Commitments =4+6 0.000 0.000 0.000 0.138 0.138
of the multiannual financial framework
(Reference amount) Payments =5+6 0.000 0.000 0.000 0.138 0.138
Heading of multiannual financial framework 7 ‘Administrative expenditure’
Year Year Year Year TOTAL
MFF 2021-
2027 2024 2025 2026 2027
Human resources 0.000 0.000 5.466 5.466
Other administrative expenditure 0.000 0.000
TOTAL Appropriations 0.000 0.000 5.4665.466
EN 70 EN
TOTAL appropriations under HEADING 7 of the multiannual financial
framework
(Total
commitments
= Total
payments)
0.000 0.000 5.4665.466
EUR million (to three decimal places)
Year Year Year Year TOTAL MFF
2021-2027 2024 2025 2026 2027
TOTAL appropriations under HEADINGS 1 to 7 Commitments 0.000 0.000 0.000 5.6045.604
of the multiannual financial framework Payments 0.000 0.000 0.000 5.6045.604
3.2.1.2. Appropriations from external assigned revenues
EUR million (to three decimal places)
Heading of multiannual financial framework Number
DG: <…….> Year Year Year Year TOTAL MFF
2021-2027 2024 2025 2026 2027
Operational appropriations
Budget line Commitments (1a) 0.000
Payments (2a) 0.000
Budget line Commitments (1b) 0.000
Payments (2b) 0.000
Appropriations of an administrative nature financed from the envelope of specific programmes
Budget line (3) 0.000
TOTAL appropriations
for DG <…….>
Commitments =1a+1b+3 0.000 0.000 0.000 0.000 0.000
Payments =2a+2b+3 0.000 0.000 0.000 0.000 0.000
Year Year Year Year TOTAL MFF
EN 71 EN
2024 2025 2026 2027 2021-2027
TOTAL operational appropriations
Commitments (4) 0.000 0.000 0.000 0.000 0.000
Payments (5) 0.000 0.000 0.000 0.000 0.000
TOTAL appropriations of an administrative nature financed
from the envelope for specific programmes (6) 0.000 0.000 0.000 0.000 0.000
TOTAL appropriations under
HEADING <….> Commitments =4+6 0.000 0.000 0.000 0.000 0.000
of the multiannual financial framework Payments =5+6 0.000 0.000 0.000 0.000 0.000
Year Year Year Year TOTAL MFF
2021-2027 2024 2025 2026 2027
TOTAL operational appropriations
Commitments (4) 0.000 0.000 0.000 0.000 0.000
Payments (5) 0.000 0.000 0.000 0.000 0.000
TOTAL appropriations of an administrative nature financed
from the envelope for specific programmes (6) 0.000 0.000 0.000 0.000 0.000
TOTAL appropriations under
HEADING <….> Commitments =4+6 0.000 0.000 0.000 0.000 0.000
of the multiannual financial framework Payments =5+6 0.000 0.000 0.000 0.000 0.000
Year Year Year Year TOTAL MFF
2021-2027 2024 2025 2026 2027
• TOTAL operational appropriations (all
operational headings)
Commitments (4) 0.000 0.000 0.000 0.000 0.000
Payments (5) 0.000 0.000 0.000 0.000 0.000
EN 72 EN
• TOTAL appropriations of an administrative nature financed
from the envelope for specific programmes (all operational
headings)
(6) 0.000 0.000 0.000 0.000 0.000
TOTAL appropriations under Headings 1
to 6 Commitments =4+6 0.000 0.000 0.000 0.000 0.000
of the multiannual financial framework (Reference
amount) Payments =5+6 0.000 0.000 0.000 0.000 0.000
Heading of multiannual financial framework 7 ‘Administrative expenditure’
EUR million (to three decimal places)
DG: <…….> Year Year Year Year TOTAL
MFF 2021-
2027 2024 2025 2026 2027
Human resources 0.000 0.000 0.000 0.000 0.000
Other administrative expenditure 0.000 0.000 0.000 0.000 0.000
TOTAL DG <…….>Appropriations 0.000 0.000 0.000 0.000 0.000
TOTAL appropriations under HEADING 7 of the multiannual
financial framework
(Total
commitments
= Total
payments)
0.000 0.000 0.000 0.000 0.000
EUR million (to three decimal places)
Year Year Year Year TOTAL MFF
2021-2027 2024 2025 2026 2027
TOTAL appropriations under HEADINGS 1 to 7 Commitments 0.000 0.000 0.000 0.000 0.000
of the multiannual financial framework Payments 0.000 0.000 0.000 0.000 0.000
EN 73 EN
3.2.2. Estimated output funded from operational appropriations (not to be completed for decentralised agencies)
Commitment appropriations in EUR million (to three decimal places)
Indicate
objectives and
outputs
Year 2024
Year 2025
Year 2026
Year 2027
Enter as many years as necessary to show the
duration of the impact (see Section1.6) TOTAL
OUTPUTS
Type41
Avera
ge
cost
N o
Cost N o
Cost N o
Cost N o
Cost N o
Cost N o
Cost N o
Cost Total
No
Total
cost
SPECIFIC OBJECTIVE No 142…
- Output
- Output
- Output
Subtotal for specific objective No 1
SPECIFIC OBJECTIVE No 2 ...
- Output
Subtotal for specific objective No 2
TOTALS
41 Outputs are products and services to be supplied (e.g. number of student exchanges financed, number of km of roads built, etc.). 42 As described in Section 1.3.2. ‘Specific objective(s)’
EN 1 EN
3.2.3. Summary of estimated impact on administrative appropriations
– The proposal/initiative does not require the use of appropriations of an
administrative nature
– The proposal/initiative requires the use of appropriations of an administrative
nature, as explained below
3.2.3.1. Appropriations from voted budget
VOTED APPROPRIATIONS Year Year Year Year TOTAL
2021 - 2027 2024 2025 2026 2027
HEADING 7
Human resources 0.000 0.000 0.000 5.466 5.466
Other administrative expenditure 0.000 0.000
Subtotal HEADING 7 0.000 0.000 5.4665.466
Outside HEADING 7
Human resources 0.000 0.000 0.000 0.138 0.138
Other expenditure of an administrative nature 0.000 0.000 0.000 0.000 0.000
Subtotal outside HEADING 7 0.000 0.000 0.000 0.1380.138
TOTAL 0.000 0.000 5.6045.604
3.2.3.2. Appropriations from external assigned revenues
EXTERNAL ASSIGNED REVENUES Year Year Year Year TOTAL
2021 - 2027 2024 2025 2026 2027
HEADING 7
Human resources 0.000 0.000 0.000 0.000 0.000
Other administrative expenditure 0.000 0.000 0.000 0.000 0.000
Subtotal HEADING 7 0.000 0.000 0.000 0.000 0.000
Outside HEADING 7
Human resources 0.000 0.000 0.000 0.000 0.000
Other expenditure of an administrative nature 0.000 0.000 0.000 0.000 0.000
Subtotal outside HEADING 7 0.000 0.000 0.000 0.000 0.000
TOTAL 0.000 0.000 0.000 0.000 0.000
3.2.3.3. Total appropriations
TOTAL
VOTED APPROPRIATIONS
+
EXTERNAL ASSIGNED REVENUES
Year Year Year Year TOTAL
2021 - 2027 2024 2025 2026 2027
HEADING 7
Human resources 0.000 0.000 0.000 5.466 5.466
Other administrative expenditure 0.000 0.000 0.000 0.000 0.000
Subtotal HEADING 7 0.000 0.000 0.000 5.4665.466
Outside HEADING 7
Human resources 0.000 0.000 0.000 0.138 0.138
EN 2 EN
Other expenditure of an administrative nature 0.000 0.000 0.000 0.000 0.000
Subtotal outside HEADING 7 0.000 0.000 0.000 0.1380.138
TOTAL 0.000 0.000 0.000 5.6045.604
The appropriations required for human resources and other expenditure of an administrative nature
will be met by redeployment within Heading 7, within the allocation which may be granted to the
managing DGs under the annual allocation procedure and in the light of budgetary constraints, with
the exception of the costs for the 10 SNEs to be deployed on the ground, for which additional
budgetary resources will be requested to the budgetary authority.
3.2.4. Estimated requirements of human resources
– The proposal/initiative does not require the use of human resources
– The proposal/initiative requires the use of human resources, as explained
below
3.2.4.1. Financed from voted budget
Estimate to be expressed in full-time equivalent units (FTEs)
VOTED APPROPRIATIONS Year Year Year Year
2024 2025 2026 2027
Establishment plan posts (officials and temporary staff)
20 01 02 01 (Headquarters and Commission’s Representation Offices) 0 0 0 15
20 01 02 03 (EU Delegations) 0 0 0 0
01 01 01 01 (Indirect research) 0 0 0 0
01 01 01 11 (Direct research) 0 0 0 0
Other budget lines (20 03 17 OLAF in Delegations) 0 0 0 1
• External staff (inFTEs)
20 02 01 (AC, END from the ‘global envelope’) 0 0 0 0
20 02 03 (AC, AL, END and JPD in the EU Delegations) 0 0 0 0
Admin. Support
line [XX.01.YY.YY]
- at Headquarters 0 0 0 0
- in EU Delegations 0 0 0 0
01 01 01 02 (AC, END - Indirect research) 0 0 0 0
01 01 01 12 (AC, END - Direct research) 0 0 0 0
Other budget lines (20 03 17 OLAF END in Delegations) - Heading 7 0 0 0 10
Other budget lines (16 01 06 03) - Outside Heading 7 0 0 0 1
TOTAL 0 0 0 27
3.2.4.2. Financed from external assigned revenues
EXTERNAL ASSIGNED REVENUES Year Year Year Year
2024 2025 2026 2027
Establishment plan posts (officials and temporary staff)
20 01 02 01 (Headquarters and Commission’s Representation Offices) 0 0 0 0
20 01 02 03 (EU Delegations) 0 0 0 0
EN 3 EN
01 01 01 01 (Indirect research) 0 0 0 0
01 01 01 11 (Direct research) 0 0 0 0
Other budget lines (specify) 0 0 0 0
• External staff (in full time equivalent units)
20 02 01 (AC, END from the ‘global envelope’) 0 0 0 0
20 02 03 (AC, AL, END and JPD in the EU Delegations) 0 0 0 0
Admin. Support line
[XX.01.YY.YY]
- at Headquarters 0 0 0 0
- in EU Delegations 0 0 0 0
01 01 01 02 (AC, END - Indirect research) 0 0 0 0
01 01 01 12 (AC, END - Direct research) 0 0 0 0
Other budget lines (specify) - Heading 7 0 0 0 0
Other budget lines (specify) - Outside Heading 7 0 0 0 0
TOTAL 0 0 0 0
The Commission currently operates under stable staffing and budgetary envelopes principles.
Additional workload and costs, including under operational programmes, would require redeployment
within existing resources, including agencies where relevant, without prejudging staffing and funding
decisions under the next MFF. However, given the need for effective reinforcement of OLAF’s
investigative capacity in relation to Ukraine and the lack of possibility to apply redeployment for the
10 Seconded National Experts which will be deployed on the ground, the 10 FTEs will be requested
above stable staffing.
3.2.4.3. Total requirements of human resources
TOTAL VOTED APPROPRIATIONS
+
EXTERNAL ASSIGNED REVENUES
Year Year Year Year
2024 2025 2026 2027
Establishment plan posts (officials and temporary staff)
20 01 02 01 (Headquarters and Commission’s Representation Offices) 0 0 15
20 01 02 03 (EU Delegations) 0 0 0 0
01 01 01 01 (Indirect research) 0 0 0 0
01 01 01 11 (Direct research) 0 0 0 0
Other budget lines (20 03 17) 0 0 0 1
• External staff (in full time equivalent units)
20 02 01 (AC, END from the ‘global envelope’) 0 0 0 0
20 02 03 (AC, AL, END and JPD in the EU Delegations) 0 0 0 0
Admin. Support
line
[XX.01.YY.YY]
- at Headquarters 0 0 0 0
- in EU Delegations 0 0 0 0
01 01 01 02 (AC, END - Indirect research) 0 0 0 0
01 01 01 12 (AC, END - Direct research) 0 0 0 0
Other budget lines (20 03 17) - Heading 7 0 0 0 10
Other budget lines (16 01 06 03) - Outside Heading 7 0 0 0 1
TOTAL 0 0 0 27
16 posts (15 posts within the Commission establishment plan and 1 post within the OLAF
establishment plan) and 1 FTE will come from redeployments from the limited Commission
redeployment pool. The posts will be financed from Heading 7, while the external staff would be
EN 4 EN
financed from the UA Facility administrative support expenditure. Additionally, a team of 10
Seconded National Experts, financed by additional allocations from Heading 7, will be deployed on
the ground to ensure the EU budget is well protected by strengthening OLAF’s anti-fraud capacity in
UA in the most cost-effective option.
The staff required to implement the proposal (in FTEs):
To be covered by
current staff
available in the
Commission
services
Exceptional additional staff*
To be financed
under Heading 7
or Research
To be financed
from BA line
To be financed
from fees
Establishment
plan posts
16 posts (15 posts
within the
Commission
establishment plan
and 1 post within
the OLAF
establishment plan)
N/A
External staff
(CA, SNEs, INT)
1 Local Agent 10 SNEs
Description of tasks to be carried out by:
Officials and temporary staff 16 officials and temporary staff to work on:
• Borrowing and budgetary sustainability: handling of additional
borrowing volumes; strengthened relations and communication with
market operators; oversight of budget exposures to Ukraine and
overall assessment of budgetary sustainability including of the
headroom; management of windfall revenues from immobilised frozen
assets; management of the Common Provisioning Fund – in relation to
third country guarantees; legal drafting and preparation of guarantee
agreements with third countries, including calibration of the
contribution to the provisioning of the Common Provisioning Fund;
preparation of contribution agreements from third countries to the
instrument.
• Implementation of the loan: increased funds that would be used for
macro-financial assistance; implementation of the new instrument
work in parallel to the Ukraine Support Loan; assessing the eligibility
of requests against UASL Regulation (in particular Art. 13) and UASL
Loan Agreement with very short deadlines; physical inspections to
suppliers (production lines) and physical verification of deliveries on a
sample basis; monitoring of financial transactions to confirm that
payments are made only to pre-approved contractors (in Product
Schedules) for validated contracts (under request for payments).
• Accounting: analyse and determine the accounting treatment for these
specific loans under the international accounting standards and ensure
robust documentation of these loans for accounting and audit
EN 5 EN
purposes. Present the accounting approach and annual reports to
external auditors.
• Annual budget follow-up: manage impact of the borrowing cost for the
budget with annual and multiannual point of view.
• Audit: adequate protection of the financial interests of the Union, in
particular a system audit is necessary to understand whether the
systems and process that the Defence Procurement Agency and UA
Ministry of Defence have put in place to implement UASL are
adequate to ensure sound financial management and compliance with
Regulation and Loan Agreement.
• Anti-Fraud: OLAF Liaison Officer to strengthen anti-fraud
capacity in Ukraine.
External staff 1 FTE (Local Agent) for direct support to the OLAF Liaison Officer.
10 SNEs will be deployed on the ground to strengthen OLAF’s anti-fraud
capacity in Ukraine.
3.2.5. Overview of estimated impact on digital technology-related investments
Compulsory: the best estimate of the digital technology-related investments entailed
by the proposal/initiative should be included in the table below.
Exceptionally, when required for the implementation of the proposal/initiative, the
appropriations under Heading 7 should be presented in the designated line.
The appropriations under Headings 1-6 should be reflected as “Policy IT expenditure
on operational programmes”. This expenditure refers to the operational budget to be
used to re-use/ buy/ develop IT platforms/ tools directly linked to the implementation
of the initiative and their associated investments (e.g. licences, studies, data storage
etc). The information provided in this table should be consistent with details
presented under Section 4 “Digital dimensions”.
TOTAL Digital and IT appropriations
Year Year Year Year TOTAL
MFF
2021 -
2027 2024 2025 2026 2027
HEADING 7
IT expenditure (corporate) 0.000 0.000 0.000 0.000 0.000
Subtotal HEADING 7 0.000 0.000 0.000 0.000 0.000
Outside HEADING 7
Policy IT expenditure on operational programmes
0.000 0.000 0.000 0.000 0.000
Subtotal outside HEADING 7 0.000 0.000 0.000 0.000 0.000
TOTAL 0.000 0.000 0.000 0.000 0.000
3.2.6. Compatibility with the current multiannual financial framework
The proposal/initiative:
– can be fully financed through redeployment within the relevant heading of the
multiannual financial framework (MFF)
EN 6 EN
– requires use of the unallocated margin under the relevant heading of the MFF
and/or use of the special instruments as defined in the MFF Regulation
– requires a revision of the MFF
3.2.7. Third-party contributions
The proposal/initiative:
– ☒does not provide for co-financing by third parties
– provides for the co-financing by third parties estimated below.
Appropriations in EUR million (to three decimal places)
Year 2024
Year 2025
Year 2026
Year 2027
Total
Specify the co-financing body
TOTAL appropriations co-
financed
3.3. Estimated impact on revenue
– The proposal/initiative has no financial impact on revenue.
– The proposal/initiative has the following financial impact:
– on own resources
– on other revenue
– please indicate, if the revenue is assigned to expenditure lines
EUR million (to three decimal places)
Budget revenue line:
Appropriations
available for the
current financial
year
Impact of the proposal/initiative43
Year 2024 Year 2025 Year 2026 Year 2027
Budget line
For assigned revenue, specify the budget expenditure line(s) affected.
Other remarks (e.g. method/formula used for calculating the impact on revenue or
any other information).
4. DIGITAL DIMENSIONS
4.1. Requirements of digital relevance
The initiative provides support to a third country and does not establish new EU-level
43 As regards traditional own resources (customs duties, sugar levies), the amounts indicated must be net
amounts, i.e. gross amounts after deduction of 20% for collection costs.
EN 7 EN
digital public services for natural or legal persons inside the Union. Nonetheless, digital
elements are supportive for the Instrument for Coordinated Support to Ukraine where
financial assistance management, defence industrial capability support, and loan initiatives
require information exchange, verification, storage and also provision of information to the
Council and European Parliament where applicable.
R1 – Digital processes for financing and implementation (Chapter IV and in particular
Article 22)
Description: transmission of reports, statements or supporting documents electronically
using secure channels and Commission systems for workflows such as requests,
verification, implementing decision or disbursements.
Stakeholders: Commission services and Council; beneficiary authorities, and EEAS for
monitoring the preconditions defined in Article 5.
Processes: Reporting, monitoring, financial management, information exchange.
R2 – Administration of defence-industrial capability support (Chapter III, in particular
Article 13)
Description: Beneficiary authorities must transmit digital documentation demonstrating
progress on supported defence-industrial capabilities, following Commission standard
templates enabling automated verification.
Stakeholders: Beneficiary authorities; Commission services.
Processes: Monitoring of the implementation and validation of procurements in accordance
with the Regulation.
R3 – Exchange with the European Parliament and the Council, including audit-relevant
information (in particular Chapter V Articles 25 and 26)
Description: The Commission must provide the European Parliament and Council with
reports and sensitive information through secure systems, where necessary.
Stakeholders: Commission services; European Parliament; Council; beneficiary authorities
(upstream).
Processes: Reporting; audit information exchange; transmission of classified/sensitive
documents.
4.2. Data
For R1–R3, the data includes financial figures, disbursement documentation, defence-
industrial capability data, and other information (including potentially sensitive/classified
material).
Data exchanges are purpose-bound, minimal, interoperable and carried out through existing
secure EU systems, avoiding duplicate data collection, aligning with the European Data
Strategy.
Existing Commission datasets and reporting channels will get reused and the aim is that
data already submitted for disbursement or monitoring is not requested again, in-line with
the once-only principle.
Providers: Beneficiary authorities (R1–R2).
EN 8 EN
Recipients: Commission services; European Parliament and Council for reporting (R3).
Triggers: Reporting cycles, disbursement requests, guarantee notifications, audit
requirements.
Frequency: Periodic (e.g. monthly, or as otherwise defined in the Regulation), and ad hoc
for financial or audit needs.
4.3. Digital solutions
4.4. Interoperability assessment
4.5. Measures to support digital implementation
Concerning all relevant requirements of digital relevance (R1-3), the Commission shall use
a secured exchange system and data templates in order to facilitate the exchange of
classified information and sensitive information between the Commission and Ukraine and,
where appropriate, with the Member States.
Responsibility: Commission services and beneficiary authorities or Member States or third
countries, where appropriate.
AI: No AI functionality is mandated.
Compliance: All systems shall comply with the EU cybersecurity framework, eIDAS, data-
protection rules, and Commission rules on handling classified information.
Reusability: All digital solutions build on existing Commission infrastructure.
The Regulation requires secure exchange of classified/sensitive information, access by the
Commission to all necessary data for obligations laid down in the Regulation, including
verification, and protection of data. All obligations are planned to be met using existing
Commission secure systems without interoperability gaps. This supports R1–R3.
As the Commission already provides assistance to the beneficiary country under existing
financial and operational support frameworks, no additional digital implementation
measures are required for R1 and R3.For defence-industrial capability reporting (R2), the
Commission may, at service level, provide guidance and clarification on the digital
templates and secure exchange procedures to ensure readiness and consistent use by the
involved parties.