EN EN
EUROPEAN COMMISSION
Brussels, 25.11.2026 COM(2026) 965 final
2026/0365 (COD)
Proposal for a
REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL
on a framework of measures for strengthening the Union's quantum ecosystem (Quantum Act)
{SEC(2026) 966 final} - {SWD(2026) 965 final} - {SWD(2026) 966 final} - {SWD(2026) 967 final}
(Text with EEA relevance)
EN 1 EN
EXPLANATORY MEMORANDUM
1. CONTEXT OF THE PROPOSAL • Reasons for and objectives of the proposal Quantum technologies use the principles of quantum mechanics to provide certain capabilities beyond those of conventional technologies or to complement such capabilities. They are generally grouped into three main areas: quantum computing and simulation, quantum communication, and quantum sensing and metrology. Quantum technologies are currently transitioning from primarily research-driven activities to real-world applications and early- stage commercialisation, amid accelerating global competition. Given the new opportunities that quantum technologies are expected to create in strategic sectors, developing and deploying quantum technologies is essential to strengthen the Union’s competitiveness, technological sovereignty and resilience and to reduce critical dependencies. The Draghi report on the future of European competitiveness1 describes quantum technologies as ‘the next trailblazing innovation in the computing field, which could open new opportunities for the EU’s industrial competitiveness and technological sovereignty’. Quantum technologies also create new security and resilience challenges. A sufficiently capable quantum computer could compromise widely used cryptographic algorithms or systems, with implications for public administrations, critical infrastructures, sensitive governmental communications, digital identities and financial services. At the same time, quantum value chains depend on specialised materials, components, software, equipment and services, some of which are supplied by a limited number of providers. While the growing scale of international competition reflects the strategic importance of quantum technologies, the coming years will determine whether the Union becomes a quantum industrial power or remains primarily a source of excellent research and technologies commercialised outside of the Union. Announced public quantum funding for up to 2025 is estimated at around EUR 8.6 billion in the Union, compared with EUR 5.3 billion in the US and estimates point at twice as much in China2. However, when it comes to private financing, quantum start-ups in the US received around EUR 7 billion in investment in 2025, compared with only EUR 1.1 billion in the Union. Major US technology companies are also investing directly in quantum technologies, while large-scale corporate investment remains much more limited in Europe3. The Union has laid strong foundations to position Europe as a leading continent in the development and uptake of quantum technologies, notably through the Quantum Europe strategy4.Around one third of the world’s quantum companies are based in the Union, and the Union holds strong positions in research, specialised talent, quantum infrastructures and enabling technologies, including in areas such as cryogenics5 and photonics. However, these strengths have not yet translated into comparable levels of private investment,industrial deployment or market scale.
1 The future of European competitiveness. Part A, A competitiveness strategy for Europe (‘the Draghi
report’), September 2024, https://data.europa.eu/doi/10.2872/9356120. 2 Public-support estimates are based on announced commitments and are not directly comparable with
actual expenditure because scope, periods and instruments differ across jurisdictions. 3 OECD, An Overview of National Strategies and Policies for Quantum Technologies, p. 28. 4 Communication from the Commission to the European Parliament and the Council Quantum Europe
Strategy: Quantum Europe in a Changing World, COM/2025/363 final. 5 Cryogenics is the science and engineering of very low temperatures. Some quantum devices, such as
superconducting quantum processors, need these temperatures to operate.
EN 2 EN
The Union holds a leading position in quantum research and innovation, but it continues to face structural weaknesses. The impact assessment identifies three key structural problems: (1) the Union struggles to translate scientific results into products and services for market uptake; (2) while the Union has a large and dynamic start-up ecosystem, companies struggle to reach industrial scale, and early demand remains too shallow and fragmented to provide predictable revenue streams or reference customers; (3) the Union relies on concentrated and, in some cases, non-EU sources for specialised components and enabling technologies, with limited visibility of and mitigation measures for these dependencies. The Union therefore needs to accelerate efforts to translate its research strengths into durable industrial and strategic capabilities. Without substantial investment in research and manufacturing capacity, Europe will remain structurally vulnerable. The Quantum Act, as the first legislative instrument on quantum technologies in Europe, offers the most appropriate response to the issues outlined above. The Act adds value by setting up a comprehensive enabling framework that aligns Union priorities, coordinates action and builds a critical mass that individual Member States cannot achieve alone. By addressing the cross-border nature of these challenges, the Act facilitates access across the Union to capabilities, infrastructure, suppliers, investors and users. It strengthens coordination, ensures continuity from research to deployment, improves the match between supply and demand and helps identify and mitigate critical dependencies. The Act is intended to strengthen the Union’s competitiveness and resilience in the global quantum ecosystem. Against this background, the proposal pursues two mutually reinforcing general objectives: (1) To sustain the Union’s scientific and technological leadership and strengthen its
competitiveness and industrial deployment capacity. It aims to improve the coordination of research and innovation (R&I) priorities, access to infrastructures, scale-up finance, specialised skills and links with first buyers and users. This would help quantum technologies and companies mature, reach the market and scale up in Europe.
(2) To improve the Union’s resilience, trusted and quantum-safe deployment and economic security in strategically relevant quantum value chains and infrastructures. The objective is to reduce exposure to critical dependencies, supply disruptions and security risks by improving the visibility of strategic dependencies and chokepoints, supporting diversification, strengthening trusted deployment and enhancing preparedness for the transition to quantum-safe solutions, particularly post-quantum cryptography6.
Together, these objectives aim to strengthen Europe's competitiveness, technological sovereignty and resilience while maintaining an open and internationally connected quantum ecosystem. • Consistency with existing policy provisions in the policy area The Quantum Act complements existing Union instruments by providing a common framework to coordinate quantum research, infrastructure and deployment activities. It is a key legislative measure implementing the quantum Europe strategy and is designed to ensure
6 Commission Recommendation (EU) 2024/1101 on a coordinated implementation roadmap for the
transition to post-quantum cryptography; (OJ L, 2024/1101, 12.4.2024, ELI: http://data.europa.eu/eli/reco/2024/1101/oj), NIS Cooperation Group, A Coordinated Implementation Roadmap for the Transition to Post-Quantum Cryptography, June 2025.
EN 3 EN
consistency with the existing Chips Act7 and the proposals for the Chips Act 2.08 and the Cloud and AI Development Act9. While those instruments address semiconductor manufacturing, cloud and AI infrastructure, the Quantum Act focuses on quantum-specific research, industrialisation, deployment and strategic resilience. It promotes synergies and complementarity while avoiding duplication of responsibilities and funding. The Quantum Act will also complement, without duplicating, the actions set out in the proposed European Biotech Act10, including as regards AI testing environments, data quality accelerators and interoperability. The procurement provisions of the Quantum Act complement the existing Union public procurement framework under Directives 2014/23/EU, 2014/24/EU and 2014/25/EU, as well as the proposed Public Procurement Act11 intended to replace them. The sector-specific measures are aligned with the objectives of the general procurement framework, particularly as regards security and resilience, while avoiding unnecessary regulatory duplication. The Quantum Act does not overlap with the proposed European Innovation Act12 since it does not contain specific provisions on research procurement including pre-commercial procurement. The Quantum Act sets out rules for procurement by Member States, both as regards procurement of quantum technology as well as regarding the post-quantum safety of products with digital elements, while for Union institutions, agencies and bodies the procurement rules are governed exclusively by the Financial Regulation13. Nevertheless, the principles of the Quantum Act should also be followed by the Commission when implementing support of quantum measures from the Union budget. The proposal also provides for an equity investment vehicle for the financial support of sovereign technologies. Existing business-support initiatives, such as the Enterprise Europe
7 Regulation (EU) 2023/1781 of the European Parliament and of the Council of 13 September 2023
establishing a framework of measures for strengthening Europe's semiconductor ecosystem and amending Regulation (EU) 2021/694 (‘Chips Act’) (OJ L, 2023/1781, 18.9.2023, ELI: http://data.europa.eu/eli/reg/2023/1781/oj).
8 Proposal for a Regulation of the European Parliament and of the Council on a framework of measures for strengthening the Union's semiconductor ecosystem, repealing Regulation (EU) 2023/1781 (‘Chips Act 2.0’) (COM(2026) 504 final, 3.6.2026, 2026/0139 (COD), available at: https://eur- lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:52026PC0504 ).
9 Proposal for a Regulation of the European Parliament and of the Council establishing a framework of measures for strengthening Europe's cloud and AI ecosystem (‘Cloud and AI Development Act’) (COM(2026) 502 final, 3.6.2026, 2026/0138 (COD), available at: EUR-Lex - 52026PC0502 - EN - EUR-Lex).
10 Proposal for a Regulation of the European Parliament and of the Council on establishing a framework of measures for strengthening Union’s biotechnology and biomanufacturing sectors particularly in the area of health and amending Regulations (EC) No 178/2002, (EC) No 1394/2007, (EU) No 536/2014, (EU) 2019/6, (EU) 2024/795 and (EU) 2024/1938 (European Biotech Act), COM/2025/1022 final, 16.12.2025, available at: https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=celex:52025PC1022).
11 Proposal for a Regulation of the European Parliament and of the Council on public procurement and concessions,repealing Directives 2014/23/EU, 2014/24/EU and 2014/25/EU, and amending Regulations (EC) No 1370/2007, (EU) 2023/1542, (EU) 2024/1157, (EU) 2024/1252, (EU) 2024/1735, (EU) 2024/1781, (EU) 2024/2847, (EU) 2024/3110 and (EU) 2025/40, and Directives 2008/98/EC, (EU) 2019/882, (EU) 2022/2381, (EU) 2023/1791 and (EU) 2024/1760 (‘Public Procurement Act’) (COM(2026) 590 final, 9.9.2026, available at: https://eur-lex.europa.eu/legal- content/EN/TXT/?uri=CELEX:52026PC0590 ).
12 Proposal for a Regulation of the European Parliament and the of the Council establishing a framework of measures for strengthening the Union innovation ecosystem and amending Regulation (EU) 2017/1001 (European Innovation Act), COM (2026) 567 final, available at https://eur- lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:52026PC0567 ).
13 Regulation (EU, Euratom) 2024/2509 of the European Parliament and of the Council of 23 September 2024 on the financial rules applicable to the general budget of the Union (OJ L, 2024/2509, 26.9.2024, ELI: http://data.europa.eu/eli/reg/2024/2509/oj).
EN 4 EN
Network (EEN)14, could help connect quantum capabilities with industry by identifying potential use cases and/or signposting SMEs to relevant technical, testing and financing support. This proposal responds to the risks identified in the economic security risk assessment performed following Commission Recommendation (EU) 2023/211315 on critical technology areas for the Union’s economic security, which identified quantum technologies as one of the four areas presenting immediate risks to technology security and leakage. It complements the Union's cybersecurity framework by supporting coordinated preparedness for the transition to post-quantum cryptography. It builds on the existing Coordinated Implementation Roadmap for the Transition to Post-Quantum Cryptography, adopted following Commission Recommendation (EU) 2024/1101 and cybersecurity cooperation structures, while avoiding unnecessary duplication of reporting arrangements. In terms of implementation, the Quantum Act will build on existing implementing bodies and programmes. The EuroHPC Joint Undertaking16, or its successor, will continue to implement Union-level quantum research, innovation and infrastructure activities falling within its mandate across quantum computing and simulation, communication, sensing and metrology. The proposal complements the adopted Chips Act, and the Chips Act 2.0 proposal. Quantum hardware depends on semiconductor design, fabrication, packaging, materials and pilot-line capabilities. To avoid overlaps, quantum-chip activities within the scope of the Chips Act and the Chips Joint Undertaking17 remain there. The Chips Joint Undertaking, or its successor, will continue to support quantum-chip design, pilot lines, prototyping, testing and validation. The EuroHPC Joint Undertaking, or its successor, will have to ensure dedicated governance arrangements reflecting the separate specific needs and independent decision-making between the high-performance computing and quantum areas. A programme Board for quantum with a separate advisory committee and with responsibility to oversee the quantum-specific part of the budget within the Joint Undertaking may be considered. The Quantum Act is designed in line with Union programmes and financing instruments proposed under the multiannual financial framework (MFF)18 for the period 2028-2034,
14 The Enterprise Europe Network is the largest business support in the world for SMEs with international
ambitions (https://een.ec.europa.eu/). 15 Commission Recommendation (EU) 2023/2113 of 3 October 2023 on critical technology areas for the
EU’s economic security for further risk assessment with Member States, OJ L, 2023/2113, ELI: http://data.europa.eu/eli/reco/2023/2113/oj; European Commission and High Representative of the Union for Foreign Affairs and Security Policy, Joint Communication to the European Parliament, the European Council and the Council on “European Economic Security Strategy”, JOIN(2023) 20 final, Brussels, 20 June 2023.
16 Council Regulation (EU) 2021/1173 of 13 July 2021 on establishing the European High-Performance Computing Joint Undertaking and repealing Regulation (EU) 2018/1488 (OJ L 256, 19.7.2021, p. 3), OJ L 256, 19.7.2021, pp. 3–51 (ELI: http://data.europa.eu/eli/reg/2021/1173/oj, as amended, most recently, by Council Regulation (EU) 2026/150 of 16 January 2026 amending Regulation (EU) 2021/1173 on establishing the European High-Performance Computing Joint Undertaking (OJ L, 2026/150, 19.1.2026, ELI: http://data.europa.eu/eli/reg/2026/150/oj).
17 Council Regulation (EU) 2021/2085 of 19 November 2021 establishing the Joint Undertakings under Horizon Europe and repealing Regulations (EC) No 219/2007, (EU) No 557/2014, (EU) No 558/2014, (EU) No 559/2014, (EU) No 560/2014, (EU) No 561/2014 and (EU) No 642/2014 (OJ L 427, 30.11.2021, p. 17), ELI: http://data.europa.eu/eli/reg/2021/2085/oj, as amended by Council Regulation (EU) 2023/1782 of 25 July 2023 amending Regulation (EU) 2021/2085 establishing the Joint Undertakings under Horizon Europe, as regards the Chips Joint Undertaking (OJ L 229, 18.9.2023, p. 55), ELI: http://data.europa.eu/eli/reg/2023/1782/oj.
18 Communication from the Commission to the European Parliament, the European Council, the Council, the European Economic and Social Committee and the Committee of the Regions, ‘A dynamic EU Budget for the priorities of the future – The Multiannual Financial Framework 2028-2034’, COM(2025)
EN 5 EN
including the proposed European Competitiveness Fund (ECF)19, and the successor to Horizon Europe20. The Quantum Act also builds on relevant activities under the digital Europe programme21, InvestEU22, the European Innovation Council and the European Investment Bank Group. Funding and investment decisions will remain subject to the applicable programme legislation, financial rules and budgetary procedures. The equity investment vehicle for the financial support of sovereign technologies, including equity and other forms of repayable support, will be implemented in accordance with the legal act governing the instruments and with the applicable financial rules. • Consistency with other Union policies The Quantum Europe Framework Initiative, laid down in this Regulation, is designed to boost EU’s R&I excellence and translate it into industrial deployment and commercialisation. By doing so, it directly supports the Union’s competitiveness agenda by creating the conditions under which European scientific excellence can be turned into industrial value, productive investment, high-quality jobs and globally competitive companies. It responds to the competitiveness challenge identified in the Draghi report and reiterated in the Competitiveness Compass23. Europe must improve its ability to scale up breakthrough technologies, deepen the Single Market for innovative products and mobilise private capital around strategic capabilities, taking into account research security considerations24.
The Quantum Europe Framework Initiative should also build on existing transnational research funding initiatives, in particular QuantERA and its successors, to help coordinate national and regional research programmes and joint calls for proposals. The framework should also consider co-funded actions under Horizon Europe, such as Regional Innovation Valleys, coordinating less and more innovative regions to bring research to market via interregional cascade calls in strategic areas, including quantum and photonics.
In addition, the proposal incorporates measures that bolster the Union’s preparedness, security and defence objectives, recognising the civilian and dual-use nature of quantum technologies25. As outlined in the European Economic Security Strategy, the 2026 FDI
570 final/2, 16.7.2025; Proposal for a Council Regulation laying down the multiannual financial framework for the years 2028 to 2034, COM(2025) 571 final, 16.7.2025.
19 Proposal for a Regulation of the European Parliament and of the Council on establishing the European Competitiveness Fund ('ECF’), including the specific programme for defence research and innovation activities, repealing Regulations (EU) 2021/522, (EU) 2021/694, (EU) 2021/697, (EU) 2021/783, repealing provisions of Regulations (EU) 2021/696, (EU) 2023/588, and amending Regulation (EU) [EDIP], COM(2025) 555, 16.7.2025.
20 Regulation (EU) 2021/695 of the European Parliament and of the Council of 28 April 2021 establishing Horizon Europe – the Framework Programme for Research and Innovation, laying down its rules for participation and dissemination, and repealing Regulations (EU) No 1290/2013 and (EU) No 1291/2013 (OJ L 170, 12.5.2021, p. 1 ELI: http://data.europa.eu/eli/reg/2021/695/oj).
21 Regulation (EU) 2021/694 of the European Parliament and of the Council of 29 April 2021 establishing the Digital Europe Programme and repealing Decision (EU) 2015/2240 (OJ L 166, 11.5.2021, p. 1, ELI: http://data.europa.eu/eli/reg/2021/694/oj).
22 Regulation (EU) 2021/523 of the European Parliament and of the Council of 24 March 2021 establishing the InvestEU Programme and amending Regulation (EU) 2015/1017 (OJ L 107, 26.3.2021, p. 30 ELI: http://data.europa.eu/eli/reg/2021/523/oj).
23 Communication from the Commission to the European Parliament, the European Council, the Council, the European Economic and Social Committee and the Committee of the Regions, A Competitiveness Compass for the EU, COM(2025) 30 final, Brussels, 29.01.2025.
24 Council Recommendation of 23 May 2024 on ‘enhancing research security’, C/2024/3510, https://eur- lex.europa.eu/legal-content/EN/TXT/PDF/?uri=OJ:C_202403510.
25 For instance, Quantum sensing can support navigation and situational awareness; and future quantum computing may affect cryptography, materials and optimisation.
EN 6 EN
Regulation26, the Niinistö report27 and the White Paper for European Defence28, quantum technologies have a strategic dimension, mainly as regards their dual-use aspect, including in navigation, cryptography and sensing. Accordingly, the Regulation establishes provisions to boost both research and the transition to post-quantum cryptographic systems, to foster trusted international cooperation, as well as mechanisms to monitor dependencies and critical components in the quantum domain.
The Quantum Act also addresses cohesion objectives by ensuring distributed access to strategic technologies across the Union. Cross-border access, specialisation and distributed user-support capacity are provided through the establishment of first-level access points in each Member State. They are either operated nationally or through a joint arrangement and are called quantum competence and acceleration centres. This network of centres will enable first-level access points within each local quantum ecosystem for technical and business support, advice on applications and use cases, and information on infrastructures or public procurement opportunities, among other things. In line with the Joint Communication of the Commission and the High Representative setting out ‘An International Digital Strategy for the European Union’29, which aims to promote a high level of security for the Union and its partners, international cooperation in quantum technologies should be consistent with the Union’s objectives of technological sovereignty and economic security. Such cooperation should contribute to fostering reliable suppliers of dual-use technologies, advancing common standards and promoting the development and deployment of quantum applications. Skills and talent development are essential to strengthening the European quantum ecosystem in the broader context of the Union of Skills and the Pact for Skills. The Regulation complements existing Union initiatives in education and training, including the Commission Communications ‘The Union of Skills’30 and ‘A STEM Education Strategic Plan: skills for competitiveness and innovation’31; research, advanced digital skills and talent mobility by supporting quantum-specific training, upskilling, reskilling and cooperation between academia and industry. These measures aim to attract talent, address skills shortages and facilitate the development, industrialisation and uptake of quantum technologies across the Union.
26 Regulation (EU) 2026/1386 of the European Parliament and of the Council of 17 June 2026 on the
screening of foreign investments in the Union and repealing Regulation (EU) 2019/452, OJ L, 2026/1386, 26.6.2026, ELI: http://data.europa.eu/eli/reg/2026/1386/oj.
27 S. Niinistö, Safer Together – Strengthening Europe’s Civilian and Military Preparedness and Readiness, available at: Safer Together – Strengthening Europe’s Civilian and Military Preparedness and Readiness | European Commission, 2024.
28 Joint White Paper for European Defence Readiness 2030, JOIN (2025) 120 final. 29 Joint Communication to the European Parliament and the Council, An International Digital Strategy for
the European Union, JOIN(2025) 140 final. 30 Communication from the Commission to the European Parliament, the European Council, the Council,
the European Economic and Social Committee and the Committee of the Regions, The Union of Skills, COM(2025) 90 final.
31 Communication from the Commission to the European Parliament, the European Council, the Council, the European Economic and Social Committee and the Committee of the Regions, A STEM Education Strategic Plan: skills for competitiveness and innovation, COM(2025) 89 final.
EN 7 EN
2. LEGAL BASIS, SUBSIDIARITY AND PROPORTIONALITY • Legal basis The Quantum Act is an enabling framework supporting the translation of Union’s excellence in quantum research and innovation activities across the Union into leadership in quantum science and technology into industrial capabilities and the scale-up and market uptake of innovative quantum technologies and solutions. Article 173(3) TFEU is the main legal basis, as it allows the Union to support Member State action in pursuing industrial-policy objectives. In particular, this Regulation aims to strengthen the competitiveness, economic security and resilience of the Union’s quantum technological and industrial base by reinforcing research, innovation and industrial capacities, reducing strategic dependencies on third countries, and facilitating the development, deployment and commercialisation of quantum technologies based on research results, without entailing the harmonisation of national laws and regulations. To that end, the Regulation establishes the Quantum Europe Framework Initiative to bridge the gap between scientific excellence and industrial exploitation and to coordinate Union and national strategies, programmes and investments, alongside measures to strengthen the security and resilience of quantum supply chains. Article 114 TFEU provides the legal basis for targeted measures intended to limit fragmentation and improve the functioning of the internal market. In particular, the proposal includes provisions as regards Articles 20, 21, 24 and 25 of this Regulation, concerning the procurement of quantum technologies and post-quantum cryptography solutions, and the coordinated transition to post-quantum cryptography. • Subsidiarity: necessity of Union Action The initiative concerns industrial policy, an area in which the Union may support, coordinate or supplement Member State action under Article 6(b) TFEU. To the extent that it includes internal-market measures based on Article 114 TFEU, it would also concern an area of shared competence under Article 4(2)(a) TFEU. The principle of subsidiarity therefore applies. The three structural problems referred to in the introduction have a significant cross-border dimension. Member State action therefore remains necessary but is insufficient on its own to address the scale, cross-border effects and coordination failures identified. Union action is necessary to complement national measures where objectives require critical mass, shared infrastructure, cross-border market formation or aggregated supply-chain visibility. • Subsidiarity: added value of Union Action Union action can add value in four main ways. First, alignment: by aligning Union and national priorities to focus resources where European scale is required, while allowing Member States to support areas that reflect their scientific and industrial strengths. Second, economies of scale: by enabling specialisation and shared access to costly infrastructure (e.g. pilot lines, testbeds), especially for start-ups, SMEs and users located in Member States lacking such facilities. Third, market leverage: by coordinating procurement and strengthening links between companies, users and investors, Union action can create stronger demand and give companies a larger home market in which to scale up, while strengthening the Union’s collective position32. Fourth, identifying and managing strategic dependencies: by aggregating information across companies, infrastructures and Member States, Union
32 European Investment Bank, , Investment Report 2025/26: Capitalising on Europe’s strengths, , pp. 7
and 254.
EN 8 EN
action can reveal concentration risks and chokepoints that would not be visible from a national perspective and facilitate coordinated diversification. • Proportionality The preferred option has been designed to limit legal and administrative obligations to what is necessary to achieve the objectives. Under the preferred option, participation by private actors is generally voluntary. Requirements apply mainly to the Commission, Member States and actors seeking designation or receiving specific Union support. Information obligations are targeted, risk-based and proportionate and apply only in clearly defined circumstances. Existing information must be reused wherever lawful and technically possible, using common definitions, interoperable digital formats and once-only reporting to avoid duplication. SMEs should benefit from simplified procedures, technical assistance and proportionate thresholds. The proposal follows a ‘reuse before new capacity’ principle. Existing laboratories, testbeds, pilot lines, competence structures and programme bodies will be used first. Upgrades or new specialised capacity should be supported only where mapping demonstrates a relevant gap or unmet demand. This reduces the risk of duplicative investment and technology lock-in in a field characterised by rapid change and competing technological approaches. The proposal also preserves technology neutrality. It does not select a single quantum computing architecture, communication technology or sensing platform as the Union standard. Quantum grand challenges, infrastructure designations, procurement measures and strategic projects are expected to use transparent criteria, competitive selection and stage gates, helping firms to adapt to technological progress. For security-sensitive applications or dependencies, safeguards on confidentiality, purpose limitation, procedural rights and the protection of commercially sensitive information apply. The procurement-related measures are limited to what is necessary to address critical dependencies in quantum technologies and ensure quantum preparedness. In particular, the introduction of non-price award criteria is intended to promote innovation, while remaining subject to the applicable Union public procurement rules. The measures do not go beyond what is necessary to achieve the objectives of this Regulation and preserve the discretion of contracting authorities within the applicable legal framework. • Choice of the instrument A regulation is the most suitable instrument as the proposal sets up a Union-level enabling framework for strategic coordination, designation of European projects and facilities, common governance, monitoring and cross-border implementation, for which directly applicable conditions are necessary. A regulation is also appropriate because many of the proposal’s measures operate through existing Union programmes and bodies and require common procedures, definitions and interfaces across Member States. A directive would risk divergent transposition of designation criteria, governance arrangements and monitoring requirements, thereby undermining the objective of creating a coherent European quantum ecosystem. At the same time, a regulation preserves national discretion over budgetary, programme and procurement decisions where harmonisation is neither necessary nor legally justified.
EN 9 EN
3. RESULTS OF EX-POST EVALUATIONS, STAKEHOLDER CONSULTATIONS AND IMPACT ASSESSMENTS • Stakeholder consultations In line with the Better Regulation Guidelines, the Commission carried out a comprehensive stakeholder consultation process to collect reliable information using a range of methods, consulted parties and tools. The consultation process combined an open call for evidence with targeted evidence- gathering. The English-language call for evidence ran between 29 October and 26 November 2025; translated versions remained open until 17 December 2025. In total, 228 responses were received, comprising 216 portal submissions and 12 additional papers. Respondents included businesses, industry associations, academic and research organisations, the public, civil- society organisations, public authorities, technical networks and other organisations. The open call for evidence was complemented by 32 targeted interviews, an industry survey with 41 responses from organisations in 13 Member States, exchanges with Member State authorities and targeted discussions with stakeholders in the areas of research, infrastructure, cybersecurity, finance and standards. The evidence-gathering process was also informed by exchanges with relevant scientific and technical advisory bodies, including the Top-Level Board on Quantum Technologies33, the European Quantum Industry Consortium (QuIC), and the advisory structures of the EuroHPC Joint Undertaking, particularly its Quantum Technologies Advisory Group. Of the industry survey responses, 33 – approximately 80% – came from micro, small or medium-sized organisations. The consultation channels helped identify the three structural problems and the seven problem drivers identified in the impact assessment. Stakeholders repeatedly pointed to fragmented Union and national action, limited continuity between research and industrialisation, growth- stage financing gaps, difficulties in accessing suitable testbeds and pilot lines, skills constraints, weak demand and procurement pathways, incomplete standards and concerns about dependence on non-EU suppliers. They also emphasised that the policy response should avoid unnecessary duplication and should make better use of existing structures. • Impact assessment In line with the Better Regulation Guidelines, this regulatory proposal is accompanied by a comprehensive impact assessment that analyses the problem and the subproblems related to the need to strengthen the competitiveness of the Union’s quantum ecosystem. The impact assessment identifies possible policy options to address the problem drivers and assesses their likely impacts. The impact assessment examined three alternative policy options against the dynamic baseline – i.e. the current situation and its expected evolution if no action were to be undertaken – and the extent to which reach of those policy options would tackle the three problems identified. The three policy options retained were assessed for their effectiveness, efficiency, coherence, subsidiarity, proportionality, legal and operational feasibility, administrative burden and budgetary implications. The second policy option (PO2) was identified as the preferred option as: it provides structured Union–Member State governance and delivery arrangements while relying primarily on existing Union and national implementation bodies. It provides greater continuity and more secure results across research, industrialisation, finance, demand, skills and resilience while limiting obligations to specified actors and activities. It relies on existing implementation structures, allows phased deployment, uses technology-neutral and stage-gated approaches and preserves flexibility in future budgetary decisions.
33 European Commission, Register of Commission Expert Groups and Other Similar Entities, Group 4007.
EN 10 EN
The Regulatory Scrutiny Board issued a positive opinion with reservations on 25 September 2026. It asked the lead service to rectify four shortcomings: the assessment of the problem and its drivers; the comprehensiveness of the dynamic baseline, including future technological developments; the detail of the measures, their implementation modalities and synergies; and the analysis of coherence with other actions. It also asked that assumptions that are not self- explanatory be substantiated and that the calculations of costs and cost savings be reported in sufficient detail. The impact assessment was modified accordingly. The description of the problems, particularly on the position of the Union against its main competitors, the US and China, was improved; as well as the explanation of policy measures, their implementation, synergies and interactions. The description and quantification of the baseline scenario was strengthened, including the interactions of quantum technologies with other technologies, specifically AI. The risk of technological lock-in and the method for choosing among competing technological pathways in quantum grand challenges, strategic projects and infrastructures were also addressed. • Regulatory fitness and simplification The preferred policy option (PO2) delivers simplification in different ways. The framework will: (i) use common definitions and templates, and digital and interoperable procedures; (ii) reuse existing information; and (iii) use once-only submission wherever legally possible. Reporting will be consolidated and proportionate to the measure, the actor’s strategic role, the public support received and the sensitivity of the information. Additionally, the preferred option does not introduce a horizontal mandatory certification regime or general reporting obligation for the wider quantum ecosystem. The proposal is expected to reduce fragmentation costs for companies and public authorities by creating common entry points, access principles and project frameworks. Monitoring will track actual burdens by company size, activity and measure so that templates, thresholds and frequencies can be adjusted if costs exceed expectations. • Fundamental rights The proposal respects the Charter of Fundamental Rights of the European Union, in particular the freedom of the arts and sciences (Article 13), the freedom to conduct a business (Article 16), the right to property (Article 17), the right to good administration (Article 41) and the right to an effective remedy (Article 47). The framework preserves scientific freedom, relies on transparent and objective criteria for access to support and designation decisions, and respects the applicable safeguards for the protection of confidential information and personal data. It does not set general reporting obligations for quantum undertakings. Any processing of personal data remains subject to applicable Union and national data protection rules.
4. BUDGETARY IMPLICATIONS The proposal does not create an automatic entitlement to Union funding. The administrative and implementation resources required to operate the framework are analytically distinct from the programme resources that may be mobilised through future Union and national budgetary decisions. Funding decisions will continue to be taken under the applicable programmes and relevant financial instruments. The central cost model estimates approximately EUR 105.92 million in societal resource costs, expressed in present-value terms for the preferred option over 2028–2037. Most of these costs fall to the public and implementation side, i.e. the Commission and other EU services, Member State authorities, and implementing bodies. Business-facing costs are
EN 11 EN
concentrated on applicants, beneficiaries and designated strategic projects; they do not apply to the general business population. Evidenced monetised savings under PO2 amount to approximately EUR 13.59 million, comprising savings for Member State authorities, businesses and implementing bodies. Separately, the impact assessment provides an indicative estimation of financing needs over the coming years of EUR 12.9-18.1 billion in 2028-2034, which may be covered by the Union’s budget under the next MFF, Member State financing as well as private financing. The human-resource implications concern strategic coordination, coordination with Member States and consultation of quantum stakeholders, the designation and review of projects and infrastructures, strategic intelligence and dependency monitoring, oversight of common monitoring, international cooperation and coordination with implementing bodies. The proposal is designed to reuse existing administrative capacity where possible and to phase in implementation in line with available resources and technological maturity. Further details will be set out in the Legislative, Financial and Digital Statement accompanying the proposal.
5. OTHER ELEMENTS • Implementation plans and monitoring, evaluation and reporting arrangements The Commission will have overall responsibility for monitoring implementation and its impacts. The monitoring framework will distinguish direct outputs from results and longer-term impacts. Broader market outcomes will not be attributed solely to the Quantum Act because they will also depend on technological breakthroughs, macroeconomic conditions, national investment, other Union instruments, private investor and buyer responses, and international developments. This distinction is important in a fast-moving sector where quantitative forecasts are subject to significant uncertainty. Monitoring will use a limited set of indicators aligned with the seven operational objectives set out in Article 4, drawing wherever possible on existing monitoring arrangements. These indicators will cover: (i) participation in supported initiatives: (ii) access to and use of quantum infrastructures; (iii) finance mobilised; (iv) innovation procurement and uptake of quantum technologies; (v) skills development; (vi) progress in post-quantum cryptography preparedness; and (vii) risks affecting critical quantum components and supply chains. The Commission will evaluate the Regulation five years after its entry into force, in accordance with Article 36. The evaluation will draw on monitoring indicators and information provided by the Quantum Strategy Board, Member States and national competent authorities. The Commission will submit a public evaluation report to the European Parliament and the Council. • Detailed explanation of the specific provisions of the proposal 1. Chapter I – General Provisions Chapter I lays out the subject matter and objectives of the Regulation and sets out the definitions used throughout the text. 2. Chapter II – Leadership in Quantum Chapter II (‘Leadership in Quantum’) encompasses provisions on quantum research excellence and industrialisation and deployment under the umbrella of a Quantum Europe Framework Initiative. The Chapter is composed of Section 1 (Leadership in Quantum Science and Technology) which addresses the aims of sustaining the Union’s scientific and
EN 12 EN
technological leadership, as well as Sections 2 (Quantum infrastructures) and Section 3 (Accelerating industrialisation and deployment of quantum technologies) which address the objectives of strengthening the Union’s industrial deployment capacity. Together, the two pillars aim to support the development of quantum technologies across the technology life cycle, from R&I to industrial scale-up and deployment, while strengthening the EU’s technological leadership, competitiveness and resilience. Chapter II sets up the Quantum Europe Framework Initiative as a Union framework (Article 3) to steer a common Union-wide strategy for research, innovation and industrialisation in quantum technologies. Member States are required to bring their national quantum strategies into alignment with the priorities and measures set out in that Framework Initiative. The general objective of the Quantum Europe Framework Initiative is to support quantum research and innovation activities to consolidate European excellence across the Union and enable the Union to lead in quantum science and technology and industrial scale- up, and to transform Europe into a quantum industrial powerhouse and a global market leader in quantum technologies (Article 4). To achieve this, the Initiative sets out seven operational objectives: (1) to secure the Union’s leadership in quantum science and technology; (2) to overcome critical technological and engineering bottlenecks; (3) to build and operate large- scale strategic quantum infrastructures; (4) to bring mature quantum solutions to market; (5) to accelerate the uptake of quantum technologies across the Union; (6) to attract and develop a strong quantum talent base, and (7) to fast-track post-quantum cryptography research, testing and deployment. Section 1 (Leadership in Quantum Science and Technology) sets out the measures to sustain and advance quantum R&I excellence. To secure the Union’s leadership in quantum science and technology, the first objective, a Quantum Excellence Network is established (Article 5). This network gathers leading quantum institutes, university laboratories and research organisations to identify and jointly address major scientific challenges, create synergies, facilitate researcher mobility and improve access to essential quantum infrastructure. The Section also sets out quantum grand challenges (Article 6), which should be strategic measures for solving major bottlenecks in high-impact quantum technologies. Addressing these challenges jointly reduces overlaps between leading centres and creates the critical mass necessary to overcome such challenges. The next revolutionary quantum solution may be merely a breakthrough away, and it is precisely this outcome that the challenges are intended to achieve. Their implementation will follow a stage-gate review model, allowing them to continue or be halted if the results do not meet the set objectives, thereby avoiding technological lock-in. Lastly, Section 1 states that the Commission will support R&I activities in post-quantum cryptography (Article 7), a key field for security and technological sovereignty. Sections 2 and 3 focus on the deployment and industrialisation of quantum technologies, as they aim to support the transition from research to industrial-scale production and commercialisation. Section 2 sets out the measures regarding the deployment and improved access to Quantum Infrastructures. It establishes the creation of the European Quantum Service Platform for Science and Industry (Article 8), which offers a common interface to quantum computing resources across the Union. This provides and facilitates a single access point for institutions, firms and users. Building on this, the Regulation supports the development and establishment of strategic quantum infrastructures (Article 9),which contribute to strengthening European quantum capabilities, industrialisation and deployment of quantum solutions.These infrastructures can be newly established or reuse existing quantum infrastructures. They will be identified according to criteria regarding their strategic relevance and added value to the
EN 13 EN
Union, current and expected needs of the quantum ecosystem, and potential cross-border use. The Section also lays out how the areas for these infrastructures are to be identified (Article 10). Section 3 lays out the measures for Accelerating industrialisation and deployment of Quantum Technologies. It establishes the basis for the recognition and designation of strategic projects (Articles 11–13). These projects contribute directly to operational objective 4 (deploying quantum technologies) by designating projects that contribute to addressing capacity gaps, boosting industrial capabilities, supporting innovation, deployment and market uptake of quantum technologies. They may also contribute to improving the resilience and autonomy of the quantum value chain. Section 3 sets out measures to support the scale-up of European quantum companies, including the establishment of specialised Quantum Technology and Innovation Hubs (Article 14) to facilitate access to infrastructure, testing, talent and skills. These will function as expertise nodes, covering several areas of quantum technology, where preferential access or reduced fees may be provided to small and medium enterprises, start-ups, universities and research organisations active in the quantum ecosystem. Article 17 requires each Member State to establish at least one Quantum Competence and Acceleration Centre. Centres may also be established jointly with other Member States or partner countries. These centres will serve as a first level access point for companies in the Union. Their geographical distribution contributes to ensuring easy and direct access for local quantum stakeholders to support in identifying applications, obtaining technical and business advice, accessing infrastructures, skills, and to provide information on finance, suppliers and procurement opportunities. When designating such centres, Member States may decide to build them based on existing national, regional or sectoral structures, with the possibility of a structure being designated both a Centre and a Hub. Thus, these two networks work horizontally to spread access to quantum support (Centres) and vertically, providing access to technical insight and resources through the specialised Hubs. Section 3 enables the designation of European Quantum Regions of Excellence (Article 15) to boost the development and visibility of the regions awarded that label. Article 16 establishes a Network of European Quantum Regions of Excellence, which organises its work autonomously, to encourage coordination, exchange of best practices, and promote synergies, among others. Quantum technologies are still an emerging market, and Section 3 sets out measures to help them grow and mature. It empowers the Commission to support standardisation, benchmarking and interoperability activities in the field of quantum technologies (Article 18); and it enables the take up of voluntary labelling schemes (Article 19). Both actions contribute to a trusted, interoperable and market-ready European quantum-technology ecosystem. The different measures set up by this Regulation do not operate in isolation but are an integral part of implementing a life-cycle approach. For instance, a medical quantum sensor for early diagnosis or patient monitoring in an early research stage could benefit from research cooperation within the Quantum Science and Technology Excellence Network. Once the technology has demonstrated its viability, the developers could receive practical support with technical implementation, prototyping, testing and validation from a Quantum Technology and Innovation Hub, with additional guidance and referrals from a Quantum Competence and Acceleration Centre. Common terminology, measurement methods, benchmarks and test procedures would help to demonstrate that the medical quantum sensor functions reliably and can be deployed in real-world settings. If the technology achieves sufficient industrial maturity, an initiative to scale up its production could qualify as a strategic project, subject to
EN 14 EN
the applicable designation criteria. To promote early market uptake, procurement of innovation could help ensure that the sensor finds its first use cases in hospitals or the public health sector and that the transition from pilot projects to repeat procurement under applicable procurement rules is successful. Another key synergic interaction is around the innovation chain. Quantum grand challenges support upstream research and engineering to overcome major quantum technological bottlenecks. Quantum infrastructures and projects help bring the most promising results towards validation, scale-up and deployment, through strategic quantum infrastructures (that validate technologies in operational environments, for example Q-MRI34) and strategic projects that would address more mature industrialisation and deployment needs of European relevance. Procurement of innovation supports downstream market uptake by using innovation procurement to create lead markets, provide an initial customer base and accelerate the adoption of quantum solutions. For example, a Q-MRI solution validated under a strategic project could later be deployed through using the procurement of innovation instrument for its first operational deployment. In this way, results from quantum grand challenges can feed into strategic projects, and outputs from the latter can be taken up under procurement of innovation, creating a virtuous feedback loop from frontier research to strategic implementation. Section 4 (Articles 20 and 21) introduces procurement-related measures for quantum technologies, public procurement of innovation and specific requirements for the procurement of post-quantum cryptography solutions. Section 5 sets out the implementation arrangements for the Quantum Europe Framework Initiative (Article 22). Implementation will take place through actions under the EuroHPC Joint Undertaking or its successor, in accordance with its legal mandate and the relevant Union programmes and instruments, without affecting the activities entrusted to other competent implementing bodies. Article 23 allows the Initiative to be supported by an equity investment vehicle for financial support to sovereign technologies, in alignment with relevant programmes. This should complement existing financial instruments such as the European Innovation Council Fund35 and the Scaleup Europe Fund36, primarily for companies larger than scale-ups and by investing in large-scale tickets in tech infrastructure. The European Innovation Council Fund can invest up to EUR 30 million per operation and has developed an extensive portfolio of some 35 quantum investments, raising four of the five largest investment rounds in quantum in the EU in 2025 and catalysing rounds representing nearly 45% of all funding raised in the EU in 2025. The recent Scaleup Europe Fund can invest up to EUR 300 million and beyond per operation in technology leading companies including in quantum. 3. Chapter III – Strengthening the Union's Quantum Resilience
34 Q-MRI (Quantum Magnetic Resonance Imaging) refers to quantum-enhanced medical imaging using
quantum sensors to measure magnetic signals at molecular level. 35 Council Decision (EU) 2021/764 of 10 May 2021 establishing the Specific Programme implementing
Horizon Europe – the Framework Programme for Research and Innovation, and repealing Decision 2013/743/EU (OJ L 167 I, 12.5.2021, p. 1, ELI: http://data.europa.eu/eli/dec/2021/764/oj).
36 Commission Implementing Decision C(2026) 2051 final of 26 March 2026 amending Implementing Decision C(2025) 7410 on the financing of the European Innovation Council component of the Specific Programme implementing Horizon Europe – the Framework Programme for Research and Innovation (2021-2027) and on the adoption of the Work Programme for 2026 as regards the introduction of the contribution of the EIC to Scaleup Europe Fund; Commission Decision C(2026) 5688 final of 3 August 2026 on establishing the Scaleup Europe Fund (SEF) compartment of the European Innovation Council (EIC) Fund.
EN 15 EN
Chapter III introduces measures to strengthen the Union’s preparedness, economic security and resilience in relation to quantum technologies. It comprises measures supporting the transition to post-quantum cryptography and a framework for strategic intelligence, dependency monitoring and the resilience of the Union quantum value chain. Section 1 introduces measures supporting the coordinated transition to post-quantum cryptography. Article 24 addresses monitoring and preparedness, Article 25 supports coordinated implementation and resilience exercises, and Article 26 concerns standardisation, benchmarking and interoperability. These measures build on existing Union cybersecurity structures and the Coordinated Implementation Roadmap for the Transition to Post-Quantum Cryptography. Specific procurement requirements are addressed separately in Article 21. The life-cycle approach also applies to the transition to post-quantum cryptography (PQC). This transition involves identifying cryptographic dependencies and risks, developing and validating interoperable and crypto-agile solutions, integrating PQC requirements into procurement, and progressively migrating existing systems towards quantum-resistant cryptography. Ensuring the Union’s technological sovereignty also requires action concerning dependencies and supply chains. To improve the visibility of the key bottlenecks and dependencies of quantum value chains, Section 2 sets out a strategic intelligence and dependency monitoring function (Article 27) to be carried out by the Commission. This Section also enables critical quantum components to be identified and monitored (Article 28), including related supply- chain and skills risks, and allows for the development of a market-intelligence platform where appropriate. This mapping of capabilities, supply chains, dependencies and vulnerabilities seeks to improve the Union’s intelligence in this area, as well as to support early warning, preparedness and risk assessment activities in relation to disruptions affecting the quantum technology sector. 4. Chapter IV – Governance Chapter IV, Section 1, sets up the Quantum Strategy Board (Articles 29 and 30), composed of high-level Member States representatives and chaired by the Commission. The Board will advise and assist the Commission on Union quantum policy, support the consistent implementation of the Regulation, facilitate coordination between Union and national quantum policies and promote cooperation and the exchange of information among Member States. In this way it tackles the fundamental issue of fragmentation of efforts and resources across the Union. Section 2 lays out the Board’s role in supporting the Commission on strategic priorities across the quantum ecosystem, including in international cooperation and strategic partnerships (Article 31). The Board will advise the Commission on reducing dependencies, addressing shortages and securing critical suppliers through reciprocal cooperation with non-EU countries. Finally, Section 3 sets up the European Quantum Alliance (Article 32), composed mainly of representatives of the Union quantum industry, as well as other stakeholders. It will serve as a stakeholder consultation mechanism that maintains a regular strategic dialogue with the Quantum Strategy Board and the Commission. This will create a structured channel for the industry, the Board and the Commission to exchange views on geopolitical, technological, market and industrial developments, as well as dependencies, gaps and opportunities across the quantum value chain. 5. Chapter V – Delegation of Power and Committee Procedure Chapter V sets out the rules and conditions governing the exercise of delegated powers and the committee procedure (Articles 33 and 34).
EN 16 EN
6. Chapter VI – Final Provisions Lastly, Chapter VI (Articles 35 to 37) provides for rules for the confidential treatment of information and an evaluation and review of the Regulation five years after its entry into force, in accordance with Article 37. For this purpose, the Commission is required to prepare and submit a report to the European Parliament and to the Council.
EN 17 EN
2026/0365 (COD)
Proposal for a
REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL
on a framework of measures for strengthening the Union's quantum ecosystem (Quantum Act)
(Text with EEA relevance)
THE EUROPEAN PARLIAMENT AND THE COUNCIL OF THE EUROPEAN UNION, Having regard to the Treaty on the Functioning of the European Union, and in particular Article 173(3) and Article 114 thereof in relation to Articles 20, 21, 24 and 25 of this Regulation, Having regard to the proposal from the European Commission, After transmission of the draft legislative act to the national parliaments, Having regard to the opinion of the European Economic and Social Committee37, Having regard to the opinion of the Committee of the Regions38, Acting in accordance with the ordinary legislative procedure, Whereas: (1) The Union is committed to become a global leader in quantum technologies. To fully
harness the benefits of quantum computing and simulation, communication, sensing and metrology across strategic sectors, the Union should act with ambition and foresight, strengthening its technological sovereignty, competitiveness, and resilience, while advancing its innovation capabilities and security of supply. To that end, it should reinforce its scientific and technological excellence, accelerate the translation of research results into industrial capabilities, support the scaling-up of undertakings, and stimulate demand for quantum technologies while strengthening the Union's preparedness for the transition to post-quantum cryptography.
(2) In accordance with Article 173(3) of the Treaty on the Functioning of the European Union (TFEU), it is necessary to adopt measures to build capacity and strengthen the quantum ecosystem of the Union, without entailing the harmonisation of national laws and regulations. The Union should reinforce the competitiveness, economic security and resilience of its quantum technological and industrial base, whilst strengthening the research, innovation and industrial capabilities of its quantum ecosystem, reducing strategic dependencies on third countries, and increasing its capacity to develop, deploy and commercialise quantum technologies. In accordance with Article 173(3) TFEU, it is necessary to adopt measures to build capacity and help strengthen the quantum ecosystem of the Union, without entailing the harmonisation of national laws and regulations. In particular, to support those aims and bridge the gap between (i) the Union’s scientific and technological excellence and innovation capabilities and (ii)
37 OJ C , , p. . 38 OJ C , , p. .
EN 18 EN
their industrial exploitation, it is necessary to establish a common Union Framework Initiative for Quantum Research, Innovation and Industrialisation (‘Quantum Europe Framework Initiative’). The Quantum Europe Framework Initiative should provide a common framework for coordination between Union and national strategies, programmes and investments around shared strategic priorities. Moreover, the framework for strengthening the security and resilience of quantum supply chains referred to in this Regulation, should contribute to reinforcing the competitiveness and economic security of the Union’s quantum technological and industrial base.
(3) Article 114 TFEU provides an appropriate legal basis for (i) the adoption of common procurement requirements for quantum technologies and post-quantum cryptography solutions, and (ii) for coordinated monitoring and precautionary measures aimed at preventing fragmentation of the internal market. Article 114 TFEU is also an appropriate legal basis for the adoption of rules on interoperability and labelling, insofar as such rules help improve the functioning of the internal market. The associated governance and cooperation arrangements support the uniform implementation of such measures across the Union.
(4) Quantum technologies and devices offer significant potential across a wide range of civilian applications, including civil security, and are relevant to national security and defence, and to preserve international security. As recognised in the EU Defence Industry Transformation Roadmap39, quantum is a key emerging technology for defence capabilities. The security and defence ecosystem should be able to access trusted Union infrastructures and tap into civil research advances where large investments are made into quantum technologies. In particular, quantum-enabled sensing, secure communications and cryptographic resilience can strengthen situational awareness, maritime domain awareness and the protection of critical infrastructure in the Union, including in its eastern border regions through synergies with initiatives such as the Black Sea Maritime Security flagship initiative. The strategic importance of quantum technologies and devices is further underlined by the inclusion of certain quantum technologies within the common minimum scope of foreign investment screening under Article 4(15), point (c) of Regulation (EU) 2026/1386, and by the export controls applicable to certain quantum-related dual-use items listed in Annex I to Regulation (EU) 2021/82140. This Regulation should apply to quantum technologies with both civilian and military applications, while excluding quantum systems specifically designed and intended exclusively for military or defence purposes. This is without prejudice to applicable Union rules on export controls and foreign investment screening. That exclusion should apply regardless of whether a public authority or a private contractor develops or uses the technology. At the same time, research and innovation activities under this Regulation should also benefit the security and defence sectors, without prejudice to the rules and requirements applicable under Union programmes and instruments supporting the defence industry, and in a manner complementary to and consistent with them. Synergies should be promoted with relevant Union initiatives in the field of civil security, in accordance with applicable Union law and with full respect for fundamental rights.
39 Communication from the Commission to the European Parliament and the Council, ‘EU Defence
Industry Transformation Roadmap: Unleashing Disruptive Innovation for Defence Readiness’, COM(2025) 845 final, 19 November 2025.
40 Regulation (EU) 2021/821 of the European Parliament and of the Council of 20 May 2021 setting up a Union regime for the control of exports, brokering, technical assistance, transit and transfer of dual-use items (OJ L, 2021/821, 11.6.2021, ELI: http://data.europa.eu/eli/reg/2021/821/oj).
EN 19 EN
(5) Quantum technologies may contribute to more secure communications, enhanced sensing and detection capabilities, and improved analytical and operational tools for law enforcement and other competent public authorities. Synergies should be promoted with relevant Union initiatives in the field of civil security, in accordance with applicable Union law and with full respect for fundamental rights.
(6) While bringing potential benefits to different areas of society, quantum technologies can also allow the breaking of currently widely deployed cryptographic schemes. It is essential for the Union to anticipate evolving threats to cryptographic systems and to ensure the resilience of technologies designed to withstand quantum-enabled attacks, including risks emerging from advances in frontier artificial intelligence. The ProtectEU Internal Security Strategy41 recognises the transition to post-quantum cryptography as a strategic priority for strengthening the Union's internal security preparedness. In line with these strategies, the timely development and deployment of post-quantum cryptography should contribute to strengthening the security and resilience of communication systems, digital services and critical infrastructure, while protecting the information exchange and sensitive data of public authorities against emerging quantum-enabled threats. Synergies should also be promoted between post- quantum cryptography and quantum communication infrastructures, as well as between post-quantum cryptography and relevant Union initiatives in the field of internal security, while ensuring complementarity with actions in the field of defence and full respect for fundamental rights.
(7) While Member States have developed substantial quantum research and innovation activities, such national efforts cannot provide a comprehensive approach to ensure the scale, continuity and coordination required to compete internationally in the quantum area. Fragmented priorities, uneven access to infrastructures and insufficient links between research, industrial development and market demand limit the ability of the Union to translate its existing scientific excellence into industrial leadership. The Quantum Europe Framework Initiative should therefore provide a common framework for coordinating Union and national actions and, under that framework, aligning priorities and capabilities across the quantum technology lifecycle. The Quantum Europe Framework Initiative should promote capacity building across the quantum technology lifecycle4, from research and technological development to industrialisation. Without establishing any funding programme, it should build on existing programmes, or where applicable, their successors, and implementing bodies, to create the conditions necessary to build the critical mass needed for large-scale technological and industrial development.
(8) To strengthen scientific excellence and strategic cooperation, and to address the absence of a stable Union mechanism for sustaining scientific cooperation around common quantum priorities across Member States, a Union-wide quantum science and technology excellence network (‘quantum excellence network’) should be established. It should bring together leading national quantum institutes and centres of excellence, including universities, research laboratories and research and technology organisations and foster sustained cooperation, researcher mobility, communication, and outreach, while providing access to enabling infrastructure. In terms of organisation of work, the quantum excellence network should have flexibility in establishing its own working arrangements. The quantum excellence network should be supported for Union
41 Communication from the Commission to the European Parliament, the Council, the European
Economic and Social Committee and the Committee of the Regions, ProtectEU: a European Internal Security Strategy, COM (2025) 148 final, 1 April 2025.
EN 20 EN
funding by the EuroHPC Joint Undertaking, subject to applicable funding decisions and should be selected through an open call for applications.
(9) To strengthen the Union’s industrial competitiveness in quantum technologies, quantum grand challenges should be introduced under the Quantum Europe Framework Initiative. Those quantum grand challenges should bring together relevant stakeholders from the public and private research and industrial sectors to address major technological and engineering bottlenecks in the further development of quantum technologies. Indicative priority areas identified in an Annex to this Regulation should guide those actions. The implementation and financing of quantum grand challenges should remain subject to the applicable Union programme rules. Where appropriate, quantum grand challenges should also encourage the development and reuse of interoperable open-source quantum software and tools, while respecting intellectual property rights and security requirements.
(10) To ensure transparency, quantum grand challenges should be implemented through open, transparent and competitive procedures under the applicable Union programme. Each grand challenge should be based on milestone-based funding and on a technology roadmap setting out clearly measurable objectives and milestones. An independent expert peer review should assess progress in accordance with the applicable programme procedures and against the predefined milestones and provide recommendations on continuation, redirection or termination. The Commission and the Governing Board of the EuroHPC Joint Undertaking established by Council Regulation (EU) 2021/1173, or its successor, should ensure that the quantum grand challenges are coordinated with relevant Union programmes and initiatives, including Horizon Europe – the Framework Programme for Research and Innovation, the European Competitiveness Fund42, the InvestEU Programme43, the Scaleup Europe Fund, the European Innovation Council Fund44, the Digital Europe Programme45, the European Defence Fund46, and the Union Space Programme47 or, where applicable, with their successors. Additionally, with a view to leveraging existing capabilities and avoiding duplication of efforts, quantum grand challenges should build on grand challenges established pursuant to Regulation (EU) 2026/XXX [insert reference to Chips Act 2.0 once adopted], to Regulation (EU) 202X/XXXX [insert reference to the Cloud and AI Development Act (CADA) once adopted], and priority challenges established under the Council Recommendation on Advanced materials [insert reference to COM(2026) 833 final once adopted].
42 Proposal for a Regulation of the European Parliament and of the Council (COM(2025) 555 final/2). 43 Regulation (EU) 2021/523 of the European Parliament and of the Council of 24 March 2021
establishing the InvestEU Programme and amending Regulation (EU) 2015/1017 (OJ L 107, 26.3.2021, p. 30, ELI: http://data.europa.eu/eli/reg/2021/523/oj).
44 Council Decision (EU) 2021/764 of 10 May 2021 establishing the Specific Programme implementing Horizon Europe – the Framework Programme for Research and Innovation, and repealing Decision 2013/743/EU (OJ L 167 I, 12.5.2021, p. 1, ELI: http://data.europa.eu/eli/dec/2021/764/oj).
45 Regulation (EU) 2021/694 of the European Parliament and of the Council of 29 April 2021 establishing the Digital Europe Programme and repealing Decision (EU) 2015/2240 (OJ L 166, 11.5.2021, p. 1, ELI: http://data.europa.eu/eli/reg/2021/694/oj).
46 Regulation (EU) 2021/697 of the European Parliament and of the Council of 29 April 2021 establishing the European Defence Fund and repealing Regulation (EU) 2018/1092 (OJ L 170, 12.5.2021, pp.149- 1477, ELI: http://data.europa.eu/eli/reg/2021/697/oj).
47 Regulation (EU) 2021/696 of the European Parliament and of the Council of 28 April 2021 establishing the Union Space Programme and the European Union Agency for the Space Programme and repealing Regulations (EU) No 912/2010, (EU) No 1285/2013 and (EU) No 377/2014 and Decision No 541/2014/EU (OJ L 170, 12.5.2021, p. 69, ELI: http://data.europa.eu/eli/reg/2021/696/oj).
EN 21 EN
(11) The transition to post-quantum cryptography requires continued Union research and innovation in secure cryptographic algorithms, implementations, as well as testing and validation. To that effect, Union support should strengthen Union capabilities, promote cryptographic agility and facilitate the development of trustworthy solutions. For that purpose of such support, priority areas should be identified in an Annex to this Regulation.
(12) Quantum computers are essential tools for developing, testing and validating scientific, public-sector and industrial applications. Therefore, a European Quantum Service Platform for Science and Industry (the ‘Quantum Platform’) should be established to contribute to and help foster a “think quantum” approach across the Union, enabling researchers, businesses, developers and public-sector users to explore the potential of quantum computing in their respective areas of activity, and to develop the skills and capabilities necessary for the future adoption of quantum technologies. To that end, the Quantum Platform should provide a common interface to the Union’s quantum computing infrastructure and dedicated software tools and services, building in particular on the infrastructure made available through the EuroHPC Joint Undertaking. Access to EuroHPC quantum computing resources should remain subject to the applicable access conditions and allocation procedures of the EuroHPC Joint Undertaking. The Quantum Platform should complement existing infrastructures and services and be capable of evolving so as to accommodate additional quantum computing services. Specifically, the Quantum Platform could gradually facilitate access to other quantum infrastructures and services, including quantum communication networks, future quantum internet services, and quantum sensing and metrology facilities, in cooperation with the relevant infrastructure operators.
(13) To promote the testing, validation, deployment and use of quantum technologies in the Union, support should be provided for the establishment, development, operation and, where relevant, expansion of strategic quantum infrastructures. Such infrastructures have the potential to strengthen the Union’s scientific and technological capabilities, industrial competitiveness and technological sovereignty by providing capacities that cannot efficiently be developed or maintained by individual actors or Member States. They could generate significant Union added value through cross-border use, shared access and complementarities between existing capacities. The implementation of Union-supported strategic quantum infrastructures should take place through open, transparent and competitive procedures in accordance with the rules applicable to the relevant Union programmes and funding instruments. The identification of areas for the deployment of strategic quantum infrastructures should take into account emerging scientific and technological needs, developments across the quantum value chain and the Union quantum ecosystem. An indicative list of priority technological areas for the establishment of strategic quantum infrastructures should be established in an Annex to this Regulation. Finally, to ensure the protection of the Union's strategic interests, security, defence and technological autonomy, access to strategic quantum infrastructures should be restricted to Member States and third countries associated with the relevant Union programme, provided that such third countries are also members of the EuroHPC Joint Undertaking, where the activities concerned fall within its remit. Access should be provided on open, transparent and non-discriminatory terms.
EN 22 EN
(14) In June 2019, Member States signed the European Quantum Communication Infrastructure (EuroQCI) Declaration48, agreeing to work together with the Commission and with the support of the European Space Agency (ESA) towards the development and deployment of a quantum communication infrastructure throughout the Union. EuroQCI seeks to strengthen the security and resilience of communications across the Union by developing a trusted European quantum communication capability. Regulation (EU) 2023/588 of the European Parliament and of the Council49 establishing the Union Secure Connectivity Programme, provides for the development and gradual integration of EuroQCI into the secure connectivity system. In order to take into account future developments in the applicable legal and regulatory framework, it is necessary to ensure the continuity of the development and deployment of EuroQCI within the framework established by this Regulation, by making it a priority area for strategic quantum infrastructures. This should enable the Union to continue supporting the advancement and deployment of secure quantum communication technologies, while strengthening Union industrial capacity and fostering the development of a competitive market for quantum communication technologies and services.
(15) To strengthen the Union’s technological sovereignty, resilience, competitiveness and prosperity in the quantum field, it is necessary to identify and support projects of strategic importance across the quantum value chain. Such strategic projects should provide a common Union framework for recognising major industrial investments and deployment initiatives addressing critical capacity and capability gaps, strategic dependencies and opportunities for Union industrial leadership. Priority technological areas should be established in an Annex to this Regulation and should be treated as indicative, to guide identification of such projects, taking into account technological maturity, infrastructure gaps and deployment needs. Strategic projects should be selected following an open call for applications, on the basis of their strategic relevance, Union added value, their contribution to strengthening the Union’s capacity in the field of quantum technologies in one or more strategic areas, their level of technical maturity or feasibility and their expected industrialisation within a reasonable time frame, or their contribution to the resilience of the Union’s quantum value chain. A proposal for a project selected for funding by the EuroHPC Joint Undertaking following such open call should be considered to be designated as a strategic project. However, the Commission may also decide to designate proposals that have not been selected for Union funding by the EuroHPC Joint Undertaking as strategic projects, to allow them to benefit from the recognition. Quantum projects that have been designated as strategic projects under this Regulation should also be considered as strategic projects within the meaning of Article 8(4) Regulation (EU) 202X/XXX [European Competitiveness Fund] and should be granted the Competitiveness Seal where they fulfil the conditions set out in Regulation (EU) 202X/XXX [establishing the European Competitiveness Fund], as high-quality projects contributing to the objectives of the European Competitiveness Fund, notably by strengthening the Union’s quantum research, innovation and industrial capacities, fostering the development and deployment of quantum technologies and enhancing the
48 European Declaration on Quantum Communication Infrastructure (EuroQCI), Digital Assembly 2019,
available at: https://digital-strategy.ec.europa.eu/en/policies/european-quantum-communication- infrastructure-euroqci .
49 Regulation (EU) 2023/588 of the European Parliament and of the Council of 15 March 2023 establishing the Union Secure Connectivity Programme for the period 2023-2027 (OJ L 79, 17.3.2023, p. 1, ELI: http://data.europa.eu/eli/reg/2023/588/oj).
EN 23 EN
competitiveness and resilience of the Union quantum ecosystem. The Commission should be able to withdraw a designation where the applicable criteria are no longer met or where the designation was based on incorrect or false information.
(16) Where public support by Member States for projects and activities under that Regulation may amount to State aid, the relevant rules apply. When planning such support measures, Member States should, where applicable, make use of the relevant frameworks for providing public support. Strategic projects should address a market failure in a proportionate manner, without duplicating or crowding out private financing, while ensuring clear Union added value.
(17) To accelerate the development, testing, validation, qualification, and market introduction of strategic quantum technologies throughout the Union, a limited number of specialised Quantum Technology and Innovation Hubs should be established at Union level. Those hubs should provide specialised knowledge, engineering expertise and skills to help start-ups and SMEs overcome critical technological and engineering bottlenecks in developing market-ready quantum solutions and products. Those hubs should be supported for Union funding by the EuroHPC Joint Undertaking, subject to applicable funding decisions. They should be selected through open calls for applications on the basis of selection criteria such as scientific and technological competence relevant to the area or areas concerned, the capability to contribute to the Union quantum ecosystem and generate Union added value, or the capacity to provide effective access for SMEs and start-ups and the potential to support industrial uptake. Geographical balance across the Union should also be considered, where appropriate, when determining the location of those hubs. To ensure efficiency, avoid unnecessary duplication, and make the best possible use of public investment, the hubs should, wherever possible, build on existing facilities, capacities and structures in the Member States. Those hubs should also cooperate with existing SME support networks, including the Enterprise Europe Network (EEN)50, to raise awareness of their services and facilitate referrals of SMEs seeking specialised technical expertise or access to experimentation and testing facilities.
(18) Where development of innovative quantum technologies or solutions might face specific regulatory challenges, regulatory sandboxes, that constitute controlled environments enabling the development, validation and testing of innovative solutions under regulatory oversight, resulting evidence-based regulatory learning, could, where appropriate, contribute to their timely market introduction.. The competent authorities of the Member States could consider making use of existing regulatory sandboxes or, where justified, explore establishing new ones in accordance with national law. Such regulatory sandboxes for time-limited experimentation may draw on the technical expertise, testing facilities and other support provided by the Quantum Technology and Innovation Hubs, while being distinct from these hubs.
(19) Quantum innovations rely on strong regional ecosystems that bring together research organisations, industry, start-ups, skills providers (such as universities, training institutions, etc.), skilled workers, infrastructures, investors and users. Strong regional ecosystems can accelerate the translation of research excellence and innovation into industrial growth and market applications. The recognition of European Quantum Regions of Excellence should therefore increase the visibility of such regional
50 The Enterprise Europe Network is the largest business support in the world for SMEs with international
ambitions (https://een.ec.europa.eu/).
EN 24 EN
ecosystems, promote cooperation across regions and help attract investment and talent, thereby strengthening the competitiveness of the Union’s quantum sector.
(20) Unequal access to quantum infrastructures, expertise and resources can lead to growing inequalities in the ability to develop and benefit from quantum technologies. SMEs, start-ups, public-sector entities, and undertakings in sectors with limited quantum expertise, often lack the capacity to identify viable use cases and navigate fragmented access routes to expertise, infrastructures, skills, finance and procurement opportunities. Quantum competence and acceleration centres should therefore be established to provide first-level user general support to facilitate broader participation in the quantum ecosystem and to promote cross-border access to relevant capacities and expertise. To fulfil their purpose, such centres should be established in every Member State or jointly by Member States, be locally accessible in each Member State and be organised within a coordinated Union-wide network. Quantum competence and acceleration centres should use common referral agreements to connect users with Quantum Technology and Innovation Hubs, pilot lines, testing facilities, and other relevant support providers. Quantum competence and acceleration centres should be supported for Union funding by the EuroHPC Joint Undertaking, subject to applicable funding decisions.
(21) Member States and the Commission should promote synergies between quantum competence and acceleration centres with existing clusters and centres established under other Union initiatives, including the European Digital Innovation Hubs established pursuant to Regulation (EU) 2021/694 of the European Parliament and of the Council51 and the European network of competence centres in semiconductors established pursuant to Regulation (EU) 202X/XXX [insert reference to Chips Act 2.0 once adopted]. Such synergies should seek to build on existing expertise, avoid duplication and facilitate access to complementary support services across the Union.
(22) To foster a competitive and interoperable Union quantum ecosystem and facilitate the market uptake and trustworthy deployment of quantum technologies, including open access tools, the Union should support standardisation, benchmarking and interoperability activities. Standards and benchmarks should be developed in light of practical needs, building on existing Union and international initiatives and promoting coordination among relevant bodies. The Commission may request the development of European standards or European standardisation deliverables, as set out in Regulation 202X/XXX on European standardisation [insert reference to Standardisation Regulation once adopted] in support of the objectives of this Regulation. Standardisation and benchmarking measures should be technology-neutral, proportionate and reflect technological maturity.
(23) All activities carried out under the European Quantum Alliance, including the Demand Forum, as well as under the Quantum competence and acceleration centres, the European Quantum Service Platform for Science and Industry and the European Quantum Regions of Excellence should be implemented in full compliance with Union competition law and other relevant provisions of Union law, ensuring that cooperation between undertakings does not lead to distortions of competition notably through the exchange of commercially sensitive information.
51 Regulation (EU) 2021/694 of the European Parliament and of the Council of 29 April 2021 establishing
the Digital Europe Programme and repealing Decision (EU) 2015/2240 (OJ L 166, 11.5.2021, p. 1, ELI: http://data.europa.eu/eli/reg/2021/694/oj).
EN 25 EN
(24) Voluntary Union technology labels for quantum devices, systems, products and services could facilitate their identification by buyers, their traceability and, where relevant, interoperability of such technologies, components and products. Such labels should only be introduced once certain conditions regarding technical maturity, proportionality, and the risk of technological lock-in have been met. The Commission should support industry-led and other credible labelling schemes that ensure transparent and non-discriminatory access to the market for all undertakings. Where appropriate, their requirements should be based on relevant standards and standardisation deliverables and should not unduly favour any particular technical solution. Such labelling schemes should not duplicate or conflict with certification or traceability requirements under Union law.
(25) The procurement-related measures established under this Regulation should complement Regulation (EU) 202X/XXX [insert reference to Public Procurement Act once adopted] as well as the provisions concerning public procurement of innovation and research and development procurement established under Regulation (EU) 202X/XXX [insert reference to European Innovation Act once adopted]. Given the specific characteristics of the quantum sector, including the limited maturity of certain markets, dependencies on specialised infrastructures, and security considerations, targeted measures are necessary to address sector-specific challenges and facilitate the procurement and deployment of innovative quantum technologies and post-quantum cryptography solutions. The Union legal framework on public procurement provides for the possibility to use quality criteria for the award of contracts other than price- related criteria. To enable further development of the Union’s quantum ecosystem, it is necessary to set mandatory criteria for the procurement of quantum technology products and services. It is therefore necessary to include requirements relating to security of supply, interoperability and lifecycle support in all procurement procedures of quantum technology products and services, in line with the objectives of competitiveness, security and resilience set out in the Union legal framework on public procurement.
(26) In addition, given the possible impact of quantum technologies on security and the Union’s strategic interests and technological autonomy, it is necessary to restrict the relevant procurement procedures to products and services that are provided by Union- controlled entities or entities from third countries authorised to participate under the provisions on international cooperation in this Regulation. In this respect, qualification as a Union-controlled entity should not necessarily require majority ownership by Union shareholders. Non-controlling shares held by third-country investors, including in listed companies with widely dispersed shares should not in themselves prevent the qualification as Union-controlled. In that context, control should be understood as the ability to exercise a decisive influence on a legal entity directly, or indirectly through one or more intermediate legal entities, as defined by Article 2(8) Regulation (EU) 2025/2643. It should be clarified that an entity is deemed to provide a quantum technology product, system or service if it performs substantial development, manufacturing or processing of the product, system or service. It may furthermore be necessary to require that also certain critical components of such procured quantum technology product, system or service are provided by Union-controlled entities, or authorised entities from third countries respectively. These require identification through a flexible mechanism that allows to consider the list of critical quantum components established under this Regulation and their availability thereof in the Union.
EN 26 EN
(27) Public procurement can play a key role in stimulating demand for innovative quantum technologies, accelerating their market uptake and strengthening the Union's technological sovereignty and security of supply. Regulation (EU) XX/XX [European Innovation Act] strengthens the role of public procurement as a driver of innovation and lays down common rules for the procurement of research and development services (‘R&D procurement’), including pre-commercial procurement. These rules provide a comprehensive framework to stimulate R&D procurement for quantum technologies. For what concerns public procurement of innovation, Regulation (EU) XX/XX [Public Procurement Act] already allows public buyers to take innovation objectives into consideration when procuring certain supplies, work or services that are not research and development services. However, to foster innovation in the area of quantum technologies, it is necessary to additionally provide that, as regards the procurement of innovative quantum technology products and services, contracting entities (‘public buyers’) should apply appropriate non-price award criteria reflecting the contribution of tenders to the development of the Union quantum ecosystem. Since a basic requirement underlying this Regulation is that all essential elements of the quantum value chain are sufficiently represented within the Union quantum ecosystem, compliance with that requirement should be taken into account in award decisions. Decisions on the award of individual contracts should remain with the public buyers concerned, in accordance with applicable Union and national law.
(28) Completing the transition to post-quantum cryptography is especially important for critical sectors because they combine (i) a high level of impact in the event of compromise, (ii) valuable long-lived data, (iii) slow and complex upgrade cycles, and (iv) a strong reliance on the trust of the whole digital infrastructure. Therefore, it is necessary to take measures to foster the uptake of solutions that support post-quantum cryptography. Public procurement of certain products or services with digital elements procured by public administration entities, as defined in Article 6(35) of Directive (EU) 2022/2555, which are in the scope of that Directive pursuant to Article 2(2), point (f), or Article 2(5), point (a), thereof, should be limited to products that support post-quantum cryptography and crypto-agility. The relevant products or services should be identified based on the criticality of the systems concerned, in line with the risk-based approach of Directive (EU) 2022/2555. The Commission should set out the technical requirements under which products or services can be deemed to support post-quantum cryptography and crypto-agility. Considering the evolving technical feasibility, it should be possible to provide derogations where suitable post-quantum cryptographic solutions are not ready or where crypto-agility is not technically feasible. With a view to strengthening the security and resilience of critical sectors, reducing strategic dependencies and supporting the development of post-quantum cryptography capabilities, Member States should encourage all entities in sectors of high criticality listed in Annex I to Directive (EU) 2022/2555, and in other critical sectors listed in Annex II to that Directive to implement those procurement limitations. To promote secure and interoperable critical communications and technological preparedness of critical communication infrastructures across the Union, post-quantum cryptography solutions developed and deployed under this Regulation should, where appropriate, ensure interoperability with the European Union Critical Communication System (EUCCS), as envisaged in Regulation (EU) 2026/XXX [insert reference to EUCCS once adopted]52.
52 Proposal for a Regulation of the European Parliament and of the Council establishing the European
Union Critical Communication System (EUCCS), COM (2026) 1010.
EN 27 EN
(29) Implementation of the Quantum Europe Framework Initiative should be entrusted to the EuroHPC Joint Undertaking, or its successor, as the competent body for quantum- related activities in accordance with Regulation (EU) 2021/1173 and the applicable work programme or other Union programmes and instruments. Taking into account the extension of the EuroHPC Joint Undertaking mandate to cover quantum technologies since January 2026, and in view of a potential successor during the Multiannual Financial Framework 2028-2034, the future implementation arrangements as regards the Quantum Europe Framework Initiative should ensure access to the scientific, technical, industrial and financial expertise needed. That should be without prejudice to the mandate of the Chips Joint Undertaking, or its successor, in accordance with its work programme to contribute to quantum-chip design, pilot lines, prototyping, testing and validation. The provisions of this Regulation should be applied in a manner that ensures complementarity and coherence with the rules governing Union programmes. In the event of a conflict between those provisions and the rules applicable to Union programmes, the latter should prevail to the extent of that conflict.
(30) The deep-tech innovation continuum requires innovative ways of financing to ensure the Union’s technological sovereignty. In that regard, the Quantum Europe Framework Initiative, Regulation (EU) 202X/XX [insert reference to Chips Act 2.0 once adopted] and Regulation (EU) 202X/XX [insert reference to CADA once adopted] are interlinked. As highlighted in the Communication of 3 June 2026 on European Technological Sovereignty and the EU Open-Source Strategy53, further action is needed to support start-ups, scale-ups and strategic companies, including through sustained financial investment capacity and mobilisation, at unprecedented scale, of both public and private capital. Such action should also ensure coherence with the Union’s Economic Security Strategy54 by supporting investment in critical technologies and infrastructure in strategic sectors essential to the Union’s technological sovereignty, economic security and competitiveness. As further underlined in the Action Plan on Cybersecurity and Artificial Intelligence55, the development of sovereign frontier capabilities requires investments of hundreds of billions of euro and calls for urgent crowding-in of private investment, including risk capital and equity, in order to develop and scale innovative European solutions. The Union faces a structural shortage of strategic growth capital and equity, resulting in dependence on third-country capital for the scaling of strategic companies and projects, despite the existence of abundant private capital that does not flow sufficiently to home-grown innovation. Therefore, the Union should urgently develop new ways to use public and private funds to invest in the most promising European start-ups and companies. This calls for coordinated Union action through public funding in the form of direct equity or quasi-equity, to catalyse private investment into large strategic Union technology ventures. To this end, innovative funding instruments, combining strategic oversight by public investors with market driven investment decisions, may be established in line with the rules of the European
53 European Commission, Communication on European Tech Sovereignty, COM(2026) 503 final
(Brussels, 3 June 2026); Commission Decision C(2020) 7149 final of 21 October 2020 on the Open Source Software Strategy 2020–2023 – "Think Open".
54 European Commission and High Representative of the Union for Foreign Affairs and Security Policy, Joint Communication to the European Parliament, the European Council and the Council on “European Economic Security Strategy”, JOIN(2023) 20 final, Brussels, 20 June 2023.
55 European Commission, Action Plan on Cybersecurity and Artificial Intelligence, COM(2026) 450 final (Brussels, 7 July 2026).
EN 28 EN
Competitiveness Fund and complementing existing financial instruments such as the European Innovation Council and the Scaleup Europe Fund56 primarily for companies larger than scale-ups and by investing in large-scale tickets in tech infrastructure. To this aim, the Union should be able to establish and implement an equity investment vehicle (the ‘Sovereign Tech Equity Fund’) for the financial support of technologies which are essential for the Union’s technological sovereignty and economic security. This should include support to the implementation of the Quantum Europe Framework Initiative and of Regulation (EU) 202X/XXX [insert reference to Chips Act 2.0 once adopted] and Regulation (EU) 202X/XXX [insert reference to the Cloud and AI Development Act (CADA) once adopted]. The vehicle should be established and implemented in accordance with the rules of Regulation (EU, Euratom) of the European Parliament and of the Council 2024/2509 (‘Financial Regulation’)57, and during the period of the MFF 2028-2034, with the rules of the ECF InvestEU Instrument established in Regulation (EU) [202X/XXX] [insert reference to ECF once adopted]. The Union should be able to participate in the vehicle as a shareholder together with the Member States and other public or private investors. With a view to increasing the leverage effect of the Union contribution, the vehicle could be established in line with the requirements to become an implementing partner of the ECF InvestEU Instrument. Member States should be able to support the equity investment vehicle, including through contributions from relevant Union programmes, subject to the rules of the relevant programmes. Appropriate governance and operational arrangements should be put in place through non-legislative acts, to underpin the ability of the vehicle to match public-sector steer with professional investment decision making and draw in private capital, andto ensure that the operations of the vehicle comply with Union law, including State aid rules, and relevant Union policies.
(31) The transition to post-quantum cryptography is essential to strengthen the cybersecurity and resilience of the Union's digital infrastructures and services against emerging quantum threats. Commission Recommendation (EU) 2024/110158 called for a coordinated approach to this transition, followed by work undertaken within the Cooperation Group (‘NIS Cooperation Group’) established pursuant to Directive (EU) 2022/2555, which led to the publication of the Coordinated Implementation Roadmap for the Transition to Post-Quantum Cryptography in June 2025 (the ‘roadmap’). The roadmap specifically recommends that Member States establish national transition plans by the end of 2026, complete the transition for high-risk use cases by the end of 2030, and by the end of 2035 for medium-risk, and, as much as feasible, for low-risk use cases. In order to ensure a coordinated approach of Union institutions, bodies, offices and agencies to post-quantum cryptography preparedness across the Union,
56 Commission Implementing Decision C(2026) 2051 final of 26 March 2026 amending Implementing
Decision C(2025) 7410 on the financing of the European Innovation Council component of the Specific Programme implementing Horizon Europe – the Framework Programme for Research and Innovation (2021-2027) and on the adoption of the Work Programme for 2026 as regards the introduction of the contribution of the EIC to Scaleup Europe Fund; Commission Decision C(2026) 5688 final of 3 August 2026 on establishing the Scaleup Europe Fund (SEF) compartment of the European Innovation Council (EIC) Fund.
57 Regulation (EU, Euratom) 2024/2509 of the European Parliament and of the Council of 23 September 2024 on the financial rules applicable to the general budget of the Union (OJ L, 2024/2509, 26.9.2024, ELI: http://data.europa.eu/eli/reg/2024/2509/oj).
58 Commission Recommendation (EU) 2024/1101 of 11 April 2024 on a Coordinated Implementation Roadmap for the transition to Post-Quantum Cryptography, (OJ L, 2024/1101, 12.4.2024, ELI: http://data.europa.eu/eli/reco/2024/1101/oj).
EN 29 EN
account should be taken of the ongoing work carried out by the Interinstitutional Cybersecurity Board (IICB), established by Regulation (EU, Euratom) 2023/2841 of the European Parliament and the Council59, in particular through its dedicated working group on post-quantum cryptography. That work aims to facilitate cooperation and the exchange of knowledge and best practices among Union institutions, bodies, offices and agencies, with a view to developing common standards, implementation and migration guidelines, and awareness-raising initiatives. To ensure continuity and avoid duplication of reporting requirements, Union institutions, bodies, offices and agencies should notify the Interinstitutional Cybersecurity Board (IICB), in accordance with Regulation (EU, Euratom) 2023/2841, of their level of preparedness with regard to the transition to post-quantum cryptography, while Member States should report on their preparedness to the Commission in accordance with this Regulation.
(32) Building on those efforts, this Regulation should further strengthen the preparedness of the Union for the timely and coordinated transition to post-quantum cryptography. Member States should ensure the timely implementation of their commitments in accordance with the roadmap. In addition, the Commission should monitor the preparedness of Member States for the transition, which should rely as far as possible on existing cybersecurity cooperation and reporting structures. The Commission should assess progress towards achieving the objectives and milestones of the roadmap, and, where it deems necessary, should adopt delegated acts supplementing by setting binding milestones and timelines for implementing the transition to post- quantum cryptography. This is without prejudice to the adoption of implementing acts pursuant to Article 20(5) of Directive (EU) 2022/2555 regarding measures for essential and important entities with regard to the use of post-quantum cryptography. Moreover, the Commission should monitor the research and technological developments in post-quantum cryptography, quantum and classical cryptanalysis and developments in quantum computing technologies, to inform initiatives at Union level and the transition to post-quantum cryptography in the Union.
(33) To strengthen the resilience of the Union quantum ecosystem, it is important to enhance the monitoring of quantum supply chains. Emerging quantum technologies vary considerably in their technological maturity, potential applications and associated opportunities and risks. Given the pace of their development, the Union should adopt a forward-looking approach to identify emerging opportunities, strategic dependencies and vulnerabilities at an early stage, while avoiding premature preference for specific technological pathways or unnecessary restrictions on innovation. To that end, the Commission should carry out strategic intelligence and dependency monitoring, including through the European Skills Observatory60, in close cooperation with Member States through the Quantum Strategy Board, to support early warning and the adjustment of priorities in light of technological developments. The risks identified through such market intelligence should, where appropriate, inform the application of existing Union and national instruments, including those relating to financing, procurement and economic security. To that end, where appropriate, the Commission should be empowered to establish, by means of implementing acts, common
59 Regulation (EU, Euratom) 2023/2841 of the European Parliament and of the Council of 13 December
2023 laying down measures for a high common level of cybersecurity at the institutions, bodies, offices and agencies of the Union (OJ L, 2023/2841, 18.12.2023, ELI: http://data.europa.eu/eli/reg/2023/2841/oj).
60 European Commission, European Skills Observatory, available at: https://employment-social- affairs.ec.europa.eu/policies-and-activities/skills-and-qualifications/union-skills/european-skills- observatory_en .
EN 30 EN
provisions for a digital twin of the quantum supply chain, serving as a market intelligence platform to support supply chain mapping, risk assessment and informed policy decisions. Additionally, in order to promote synergies and cooperation between Union initiatives, avoid duplication and ensure the efficient use of resources, the market intelligence platform, provided for in this Regulation, should, where appropriate and technically feasible, be capable of being integrated with the Business- to-Business Supply Chain Platform established by Regulation (EU) 202X/XXX [insert reference to Chips Act 2.0 once adopted].
(34) To achieve the objectives set out in this Regulation in a coordinated and efficient manner, a governance mechanism should be established at Union level. It is therefore necessary to set up a Quantum Strategy Board, composed of representatives of Member States and chaired by the Commission. The Quantum Strategy Board should assist the Commission by facilitating a smooth, effective and harmonised cooperation among Member States, providing strategic advice on common priorities and gaps. The Quantum Strategy Board should also closely follow progress in the implementation of the different components of the Quantum Europe Framework Initiative, identify new areas for strategic quantum infrastructures and strategic projects, based on the expertise, capabilities and priorities of Member States and advise on matters related to post-quantum cryptography. Furthermore, the Governing Board of the EuroHPC Joint Undertaking should retain responsibility for work programmes, calls and financing decisions under the applicable legal and budgetary framework. The Quantum Strategy Board should not take any financing decisions under the respective work programme.
(35) To receive important advice on specific matters, the Chair of the Quantum Strategy Board, in close cooperation with its members, may establish sub-groups of the Quantum Strategy Board to work on dedicated topics, such as standards, skills, or post-quantum cryptography, and invite experts to participate in the meetings on an ad hoc basis, or invite stakeholders, in particular organisations representing the interests of the Union quantum industry, including the European Quantum Alliance, to participate in its sub-groups as observers.
(36) The bodies and instruments established by this Regulation should be without prejudice to the instruments and governance mechanisms established in the defence and space sectors, including the relevant programme committees and the Observatory of Critical Technologies.
(37) Given the strategic importance of quantum technologies for the Union’s long-term security, resilience, and technological leadership, reciprocal cooperation or partnerships with third countries should be pursued only where this is consistent with the Union’s strategic interests and with the need to safeguard the Union’s technological sovereignty, security, and public order. Such cooperation or partnerships should in any case be subject to appropriate safeguards that protect the Union's technological interests, the protection of sensitive knowledge, intellectual property, and security-related capabilities, in particular against undue dependencies or information leaks without prejudice to the applicable eligibility rules of Union programmes and funding instruments. Subject to these safeguards, participation by entities established in third countries in activities under this Regulation may be based on association to the relevant Union funding programme or on a strategic partnership providing for reciprocal participation. The mutually beneficial partnerships, including
EN 31 EN
with emerging markets and developing countries, should be established in coherence with the Global Gateway Strategy61 and International Digital Strategy62.
(38) In the field of public procurement, reciprocity should not be inferred solely from the formal eligibility of Union-controlled entities to submit tenders. It should require genuine opportunities to compete for and obtain contracts under transparent, objective and non-discriminatory conditions. The Commission should therefore consider not only the applicable legal framework but also actual procurement practices and award decisions, including evidence of systematic or recurrent unjustified disadvantages for Union-controlled entities. Existing international market-access commitments and the competences of the authorities responsible for the relevant procurement procedures should remain unaffected.
(39) The work of the Quantum Strategy Board should be complemented by the creation of a European Quantum Alliance which should constitute a platform for stakeholder engagement and facilitate the exchange of expertise and industry perspectives. More specifically, to foster coordination and stakeholder consultation within the Union’s quantum ecosystem, set up a demand forum to promote market uptake, and collect relevant technical, industrial and market input, the European Quantum Alliance should act as an open forum involving research organisations, industry, start-ups and SMEs, users, investors and relevant public authorities, entities or organisations. The Alliance should not have any decision-making powers. The Alliance should engage in a regular strategic dialogue with the Quantum Strategy Board to facilitate the exchange of expertise and information, ensure that industry perspectives are taken into account and contribute to the alignment of the Union’s quantum policy priorities with the needs of the Union quantum ecosystem.
(40) In view of the growing demand for quantum-related skills, efforts to strengthen the Union’s quantum talent base and the competitiveness of its quantum ecosystem should seek to encourage broader participation in quantum education, training and skills development. The implementation of this Regulation should be guided by excellence- based and merit-based selection criteria, with due regard, where appropriate, to equal opportunities, including gender balance.
(41) To ensure flexibility and to reflect technological development and evolving market needs in the quantum and post-quantum cryptography ecosystem, the power to adopt acts in accordance with Article 290 TFEU should be delegated to the Commission in respect of amending Annex I to update the list of priority areas for quantum grand challenges, amending Annex II to update the list of priority areas for post-quantum cryptography, amending Annex III to update the priority areas for strategic quantum infrastructures, amending Annex IV to update the priority areas for strategic projects and of supplementing this Regulation by establishing specific milestones and timelines for the transition to post-quantum cryptography. It is of particular importance that the Commission carries out appropriate consultations during its preparatory work, including at expert level, and that those consultations are conducted in accordance with the principles set out in the Interinstitutional Agreement of 13 April 2016 on
61 Joint Communication to the European Parliament, the Council, the European Economic and Social
Committee, the Committee of the Regions and the European Investment Bank - The Global Gateway (JOIN(2021) 30 final).
62 European Commission: Directorate-General for Communications Networks, Content and Technology, An international digital strategy for the European Union, European Commission, 2025, https://data.europa.eu/doi/10.2759/4019528.
EN 32 EN
Better Law-Making63. In particular, to ensure equal participation in the preparation of delegated acts, the European Parliament and the Council should receive all documents at the same time as Member States’ experts, and their experts should systematically have access to meetings of Commission expert groups dealing with the preparation of delegated acts.
(42) In order to ensure uniform conditions for the implementation of Article 15(1) and 22(2), implementing powers should be conferred on the Commission.
(43) The implementing acts powers relating to Article 20(4) and 27(3) should be exercised in accordance with Regulation (EU) No 182/2011 of the European Parliament and of the Council64.
(44) In order to ensure trustful and constructive cooperation of competent authorities at Union and national level, all parties involved in the application of this Regulation should respect the confidentiality, authenticity and integrity of information and data obtained in carrying out their tasks to protect in particular intellectual property rights, sensitive business information and trade secrets.
(45) This Regulation should be without prejudice to the application of Articles 101 and 102 TFEU, and to the enforcement powers of competition authorities. If any of the measures provided for by this Regulation constitute State aid, the provisions concerning such measures should be without prejudice to the application of Articles 107 and 108 TFEU.
(46) Since the objectives of this Regulation cannot be sufficiently achieved by the Member States, but can rather, by reason of the scale or effects of the action, be better achieved at Union level, the Union may adopt measures, in accordance with the principle of subsidiarity as set out in Article 5 of the Treaty on European Union. In accordance with the principle of proportionality, as set out in that Article, this Regulation does not go beyond what is necessary in order to achieve those objectives.
HAVE ADOPTED THIS REGULATION:
Chapter I
General Provisions
Article 1 Subject matter and scope
1. This Regulation lays down: (a) a framework of measures for strengthening the Union quantum ecosystem,
promoting the competitiveness and industrial deployment of quantum technologies, and improving the functioning of the single market by ensuring
63 Interinstitutional Agreement between the European Parliament, the Council of the European Union and
the European Commission on Better Law-Making (OJ L 123, 12.5.2016, p. 1, ELI: http://data.europa.eu/eli/agree_interinstit/2016/512/oj).
64 Regulation (EU) No 182/2011 of the European Parliament and of the Council of 16 February 2011 laying down the rules and general principles concerning mechanisms for control by Member States of the Commission’s exercise of implementing powers, (OJ L 55, 28.2.2011, p. 13, ELI: http://data.europa.eu/eli/reg/2011/182/oj).
EN 33 EN
economic security and resilience in strategically relevant quantum value chains and infrastructures; and
(b) provisions to establish an equity investment vehicle to support quantum technologies and the full-stack technologies that are essential for the Union’s technological sovereignty and economic security, including those technologies under the scope of Regulation (EU) XX/XX [insert reference to Chips Act 2.0 once adopted] and of Regulation (EU) XX/XX [insert reference to CADA once adopted].
2. For the purposes of paragraph 1, point (a), this Regulation establishes: (a) a common European quantum research and innovation framework which
strengthens the Union’s capacity in quantum research and technological development, and supports large-scale initiatives addressing strategic scientific, technological and engineering challenges;
(b) measures to support the scale-up of companies and market uptake of innovative quantum technologies and solutions by accelerating industrial deployment across the Union, facilitating engagement with users, promoting the procurement of those solutions, and increasing access to finance;
(c) measures to strengthen the quantum value-chain resilience, in particular by enabling strategic dependencies to be identified and to prevent supply-chain disruptions and support preparedness for the transition towards quantum-safe infrastructures and solutions;
(d) a coordination framework which supports the strategic development and oversight of Union action in the field of quantum technologies.
3. This Regulation shall not affect the specific procurement procedures and conditions applicable in the defence sector referred to in Articles 9, 11, 15, 52 and 53 of Regulation (EU) 2025/264365 and in Council Regulation (EU) 2025/110666, or their successor programmes.
Article 2 Definitions
For the purposes of this Regulation, the following definitions apply: (1) ‘quantum value chain’ means the system of activities, actors, and technologies
relating to the research, development, design, manufacturing, integration, deployment, commercialisation and operation of quantum technologies and their enabling components, systems and applications;
(2) ‘quantum components’ means physical and functional building blocks of quantum technologies designed to create, control, transmit, process or measure quantum states and systems;
65 Regulation (EU) 2025/2643 of the European Parliament and of the Council of 16 December 2025
establishing the European Defence Industry Programme and a framework of measures to ensure the timely availability and supply of defence products (‘EDIP Regulation’) (OJ L, 2025/2643, 29.12.2025, ELI: http://data.europa.eu/eli/reg/2025/2643/oj).
66 Council Regulation (EU) 2025/1106 of 27 May 2025 establishing the Security Action for Europe (SAFE) through the Reinforcement of the European Defence Industry Instrument (OJ L, 2025/1106, 28.5.2025, ELI: http://data.europa.eu/eli/reg/2025/1106/oj).
EN 34 EN
(3) ‘critical quantum components’ means quantum-specific or enabling components, materials, devices or software that are indispensable for the development, manufacturing, integration, deployment or operation of quantum technologies, and whose limited availability or disruption would significantly impair the resilience, security or competitiveness of the quantum value chain of the Union;
(4) ‘quantum technologies’ means technologies that exploit a combination of quantum- mechanical properties, including quantised states, superposition, entanglement or interference, to enable different applications, including quantum computing and simulation, quantum communications, quantum sensing and quantum metrology;
(5) ‘quantum computing’ means a computing technology that employs quantum- mechanical states and operations for the processing, storage or transmission of information;
(6) ‘quantum communication’ means the sharing of information using the principles of quantum mechanics;
(7) ‘quantum sensing’ means the use of systems exploiting absolute, unchangeable atomic or molecular properties to perform measurements of physical quantities, such as magnetic fields, gravity, and time, with minimum calibration requirements;
(8) ‘quantum metrology’ means the science and practice of reliable, standardised and comparable measurement with accuracy boosted by quantum entanglement and coherence;
(9) ‘quantum communication infrastructure’ means an infrastructure enabling the provision of quantum communication services;
(10) ‘small and medium-sized enterprises’ or ‘SMEs’ means small or medium-sized enterprises as defined in the Annex to Commission Recommendation 2003/361/EC67;
(11) ‘start-up’ means an undertaking meeting the criteria for an innovative start-up set out in point 3 of the Annex to Commission Recommendation (EU) 2026/72068;
(12) ‘EuroHPC Joint Undertaking’ means the joint undertaking established by Council Regulation (EU) 2021/1173 and any successor entity or initiative established under Union law;
(13) ‘Chips Joint Undertaking’ means the joint undertaking established by Council Regulation (EU) 2021/208569 and any successor entity or initiative established under Union law;
(14) ‘standard’ means a technical specification as defined in Article 2, point (1), of Regulation 202X/XXX on European standardisation [insert reference to Standardisation Regulation once adopted];
67 Commission Recommendation of 6 May 2003 concerning the definition of micro, small and medium
sized enterprises (OJ L 124, 20.5.2003, p. 36, ELI: http://data.europa.eu/eli/reco/2003/361/oj). 68 Commission Recommendation (EU) 2026/720 of 18.3.2026 on the definition of innovative enterprises,
innovative startups and innovative scaleups, OJ L, 2026/720, 24.3.2026, ELI: http://data.europa.eu/eli/reco/2026/720/oj.
69 Council Regulation (EU) 2021/2085 of 19 November 2021 establishing the Joint Undertakings under Horizon Europe and repealing Regulations (EC) No 219/2007, (EU) No 557/2014, (EU) No 558/2014, (EU) No 559/2014, (EU) No 560/2014, (EU) No 561/2014 and (EU) No 642/2014 (OJ L 427, 30.11.2021, p. 17, ELI: http://data.europa.eu/eli/reg/2021/2085/oj).
EN 35 EN
(15) ‘European Quantum Communication Infrastructure’ or ‘EuroQCI’ means a certified secure end-to-end quantum communication infrastructure composed of space based and terrestrial-based solutions, enabling information and data to be transmitted and stored securely and capable of linking critical public communication assets throughout the Union;
(16) ‘post-quantum cryptography’ means cryptography based on algorithms designed to be resistant to attacks by both classical and quantum computers;
(17) ‘crypto-agility’ means the ability to replace or adjust cryptographic algorithms across systems and components, including protocols, applications, software, hardware, firmware, and infrastructure, without compromising security and with no or minimal disruption to ongoing operations;
(18) ‘contract’ means a public contract as defined in Article 6(18), a supply, works or service contract as defined in Article 6, points (21), (22) and (1) and a concession contract as defined in Article 115(1) of Regulation (EU) 202X/XXX [insert reference to Public Procurement Act once adopted];
(19) ‘contracting authority’ means, a contracting authority as defined in Article 7 of Regulation (EU) 202X/XXX [insert reference to Public Procurement Act once adopted];
(20) ‘contracting entity’ means a contracting entity as defined in Article 8 of Regulation (EU) 202X/XXX [insert reference to Public Procurement Act once adopted];
(21) ‘Union-controlled entity’ means any entity set up under the law of a Member State and having its registered office or central administration within the Union that is active in the quantum value chain and is not subject to control by a third country, a legal entity established in a third country or a natural person who is not a national of a Member State;
(22) ‘control’ means control as defined in Article 2, point (8), of Regulation (EU) 2025/2643 of the European Parliament and of the Council70;
(23) ‘trade secret’ means a trade secret as defined in Article 2, point (1), of Directive (EU) 2016/943 of the European Parliament and of the Council71.
70 Regulation (EU) 2025/2643 of the European Parliament and of the Council of 16 December 2025
establishing the European Defence Industry Programme and a framework of measures to ensure the timely availability and supply of defence products (‘EDIP Regulation’), OJ L, 2025/2643, 29.12.2025, ELI: http://data.europa.eu/eli/reg/2025/2643/oj).
71 Directive (EU) 2016/943 of the European Parliament and of the Council of 8 June 2016 on the protection of undisclosed know-how and business information (trade secrets) against their unlawful acquisition, use and disclosure, OJ L 157, 15.6.2016, p. 1, ELI: http://data.europa.eu/eli/dir/2016/943/oj.
EN 36 EN
Chapter II
Leadership in Quantum
Article 3 Quantum Europe Framework Initiative
1. A common Union Framework Initiative for Quantum Research, Innovation and Industrialisation (the ‘Quantum Europe Framework Initiative’) is established.
2. Member States shall adopt national strategies on quantum technologies (‘national strategies’) which are aligned with the agreed priorities and measures of the Quantum Europe Framework Initiative or shall align their existing national strategies accordingly.
3. Member States shall notify the Commission of national strategies adopted or aligned in accordance with paragraph 2 by [OP: to complete six months as of entry into force of this Regulation]. The Commission shall monitor the Member States’ adoption and alignment of their national strategies referred to in paragraph 2. Member States shall notify the Commission of any subsequent changes thereof within six months of their adoption.
4. The Commission shall assess whether a national strategy is consistent with the priorities and measures of the Quantum Europe Framework Initiative. Where that is not the case, the Commission shall provide the Member State concerned with concrete recommendations for the purpose of revising that national strategy. The Member State concerned shall submit a revised version of its national strategy to the Commission within a reasonable period of time.
5. The Commission shall monitor the implementation of the measures of the Quantum Europe Framework Initiative and report on its progress annually to the Quantum Strategy Board referred to in Article 29.
Article 4 General objective and operational objectives of the Quantum Europe Framework Initiative 1. The Quantum Europe Framework Initiative shall support quantum research and
innovation activities by consolidating excellence across the Union to lead in quantum science and technology and industrial scale-up and transform the Union into a quantum industrial powerhouse and global market leader in quantum.
2. The Quantum Europe Framework Initiative shall have at least the following operational objectives: (a) operational objective 1 – lead quantum: leadership in quantum science and
technology; (b) operational objective 2 – grow quantum systems: breakthroughs in the Union’s
critical quantum technological and engineering bottlenecks; (c) operational objective 3 – roll out quantum: build and deploy large-scale
strategic quantum infrastructures;
EN 37 EN
(d) operational objective 4 – deploy quantum: bringing mature quantum technologies to deployment and market;
(e) operational objective 5 – think and adopt quantum: accelerating quantum growth and adoption in the Union;
(f) operational objective 6 – unlock skills for quantum: attracting and strengthening the quantum talent base of the Union;
(g) operational objective 7 – make the Union quantum-safe: accelerating the research, testing, validation and deployment of post-quantum cryptography.
3. When appropriate, the operational objectives referred to in paragraph 2 shall be implemented by applying an iterative approach supporting the development and uptake of quantum technologies across interconnected stages of their development, from research and scientific discovery, through engineering, testing, validation and demonstration, to industrialisation, scale-up, deployment and market uptake (‘technology lifecycle approach’).
SECTION 1
LEADERSHIP IN QUANTUM SCIENCE AND TECHNOLOGY
Article 5 Quantum excellence network
1. For the purposes of operational objective 1 set out in Article 4(2), point (a) (‘lead quantum’), a quantum science and technology excellence network (the ‘quantum excellence network’) is established.
2. The quantum excellence network shall be composed of leading national quantum institutes and centres of excellence, including universities, research laboratories and research and technology organisations active in quantum science and technology.
3. The members of the quantum excellence network shall jointly define and address major scientific challenges in quantum research. For that purpose, they shall create synergies to tackle the scientific challenges, and facilitate cooperation, including through mobility of the researchers involved, outreach and communication.
4. The members of the quantum excellence network shall have access to infrastructures essential for addressing those challenges referred to in paragraph 3, in accordance with the applicable access conditions.
5. The members of the quantum excellence network shall be selected by means of open, transparent and competitive procedures, based on their scientific and technological excellence and on the complementarity of relevant expertise and capacities.
6. The members of the quantum excellence network shall establish internal working arrangements for the organisation, coordination and promotion of their joint activities.
EN 38 EN
Article 6 Quantum grand challenges
1. For the purposes of operational objective 2 set out in Article 4(2), point (b) (‘grow quantum systems’), quantum grand challenges shall be launched, consisting of strategic actions supporting research and technology initiatives aimed at addressing major technological and engineering bottlenecks in the further development of quantum technologies (‘quantum grand challenges’). Such actions may, where appropriate, support the development of interoperable open-source quantum software and tools, without prejudice to applicable intellectual property rights and security requirements. Quantum grand challenges may concern the indicative areas set out in Annex I.
2. The Commission shall be empowered to adopt delegated acts in accordance with Article 33 to amend the list of indicative areas for quantum grand challenges set out in Annex I in order to reflect emerging or new technological and engineering bottlenecks, and market developments relevant to the quantum sector
3. Quantum grand challenges shall be coordinated with grand challenges established pursuant to Regulation (EU) 202X/XXXX [insert reference to Chips Act 2.0 once adopted], pursuant to Regulation (EU) 202X/XXXX [insert reference to the Cloud and AI Development Act (CADA) once adopted], and, where appropriate, with priority challenges established under Council Recommendation XX on Advanced materials [insert reference to (COM(2026) 833 final once adopted].
4. Strategic actions implementing quantum grand challenges shall be selected by means of open, transparent and competitive procedures. Such actions shall be implemented through a technology roadmap setting the detailed implementation approach and major milestones to be achieved by each quantum grand challenge.
Article 7 Research and innovation in post-quantum cryptography
1. For the purposes of operational objective 7 set out in Article 4(2), point (g) (‘make the Union quantum-safe’), the Commission shall support research and innovation activities in post-quantum cryptography through relevant Union programmes, with a view to contributing to security and resilience in the context of advances in quantum technologies.
2. The activities referred to in paragraph 1 shall contribute, in particular, to the development, testing and validation of secure, interoperable, crypto-agile and deployable post-quantum cryptographic solutions, including tools and methods facilitating their integration into existing and future digital systems and infrastructures. Those activities may address the priority areas set out in Annex II, without prejudice to other priorities identified under the relevant Union programmes
3. The Commission shall be empowered to adopt delegated acts in accordance with Article 33 to amend the priority areas set out in Annex II in order to reflect emerging technology changes and market developments relevant to post-quantum cryptography.
EN 39 EN
SECTION 2
QUANTUM INFRASTRUCTURES
Article 8 European Quantum Service Platform for Science and Industry
1. A European Quantum Service Platform (the ‘Quantum Platform’) is established as a coordinated service mechanism to support scientific research, technological development and industrial innovation.
2. The Quantum Platform shall provide a common interface for researchers, research organisations, undertakings, including start-ups and SMEs, and public authorities to access the Union’s quantum computing infrastructure including quantum emulation, simulation, and physical quantum computing resources, as well as related services.
3. The Quantum Platform shall carry out the following activities: (a) provide information on available quantum computing resources and on their
capabilities and access conditions, and facilitate access through existing allocation procedures;
(b) facilitate access to a common, interoperable quantum software stack, and interfaces supporting different quantum computing technologies;
(c) promote interoperability with cloud services, including those provided by cloud service providers established in the Union;
(d) provide access to relevant technical guidance and support services, in coordination with the Quantum Technology and Innovation Hubs referred to in Article 14 and the quantum competence and acceleration centres referred to in Article 17.
Article 9 Strategic quantum infrastructures
1. For the purposes of operational objective 3 set out in Article 4(2), point (c) (‘roll out quantum’), the Commission shall support the establishment and development of infrastructures that help facilitate the development, testing, validation, demonstration, deployment and use of quantum technologies (‘strategic quantum infrastructures’).
2. Strategic quantum infrastructures shall include one of the following: (a) existing quantum infrastructures established or supported under Union
programmes or initiatives, where their continued implementation, operation, or development contributes to the purpose referred to in paragraph 1;
(b) new quantum infrastructures established or developed to contribute to the purpose referred to in paragraph 1.
3. Strategic quantum infrastructures shall be located within the territory of the Union. 4. Access to strategic quantum infrastructures shall be limited to Union-controlled
entities. By way of derogation, other entities may be granted access where such access is provided under a partnership concluded by the Union in accordance with Article 31(4) and (6), subject to Article 31(5), and (7).
EN 40 EN
5. Strategic quantum infrastructures shall be implemented through open, transparent and competitive procedures, in accordance with the applicable rules governing the relevant Union programmes and funding instruments.
Article 10 Identification of areas for strategic quantum infrastructures
1. The quantum infrastructures concerning the priority areas set out in Annex III shall be considered as strategic quantum infrastructures.
2. The Commission shall be empowered to adopt delegated acts in accordance with Article 33 to amend the priority areas listed in Annex III in order to reflect technological advances or emerging infrastructure needs and gaps in Union capacities relevant to the quantum sector.
SECTION 3
ACCELERATING INDUSTRIALISATION AND DEPLOYMENT OF QUANTUM TECHNOLOGIES
Article 11 Strategic projects
1. For the purposes of operational objective 4 set out in Article 4(2), point (d) (‘deploy quantum’), the Commission shall designateprojects that help achieve the strategic objectives of the Union in quantum technologies by addressing critical capacity gaps, strengthening and building industrial capabilities, supporting innovation, deployment and market uptake of quantum technologies, or enhancing the resilience, security and autonomy of the quantum value chain (‘strategic projects’).
2. Only projects located within the territory of the Union may be designated as strategic projects that contribute to the achievement of the objectives referred to in paragraph 1.
3. Participation in projects that contribute to the achievement of the strategic objectives referred to in paragraph 1 shall be limited to Union-controlled entities and other entities under a partnership concluded by the Union in line with Article 31(4) and (6), subject to Article 31(7).
Article 12 Identification of areas for strategic projects
1. Strategic projects may include projects concerning the priority areas set out in Annex IV.
2. The Commission shall be empowered to adopt delegated acts in accordance with Article 33 to amend the list of priority areas set out in Annex IV in order to reflect technological change, capacity gaps in industrial Union capabilities or market developments, relevant to the quantum sector.
EN 41 EN
Article 13 Designation of strategic projects
1. Strategic projects shall be selected by the EuroHPC Joint Undertaking following an open call for applications. A proposal for a project which is selected for funding by the EuroHPC Joint Undertaking following this call shall be considered to be designated as a strategic project within the meaning of Article 8(4) of Regulation (EU) 202X/XXX on the European Competitiveness Fund (ECF) [insert reference to ECF once adopted].
2. Subject to the consent of the applicant, the Commission may adopt a decision designating as strategic projects proposals not selected for funding by the EuroHPC Joint Undertaking, where they meet the applicable evaluation requirements laid down in the relevant call referred to in paragraph 1. That call and related application procedures shall clearly indicate the possibility of obtaining such designation. Each strategic project shall have an operator.
3. The operator of a strategic project may request the Commission to review the duration of the designation or to approve modifications to the operator’s implementation plans, where the operator considers such a review duly justified by unforeseen external circumstances. On the basis of such a review, the Commission may revise the duration of the status of a strategic project granted or accept the modifications to the implementation plans.
4. Without prejudice to any suspension or termination of funding agreements between the operator and the EuroHPC Joint Undertaking, as applicable, where the Commission finds that a proposal designated as a strategic project in accordance with paragraph 1 or 2 no longer fulfils the requirements in the call for applications, or that the designation was based on incorrect information affecting compliance with those criteria, it may withdraw the designation by means of a decision.
5. Before adopting a decision pursuant to paragraph 4, the Commission shall inform the operator of the reasons for the envisaged withdrawal and shall give that operator the opportunity to submit observations within an appropriate time limit. The Commission shall take due account of those observations.
Article 14 Quantum Technology and Innovation Hubs
1. For the purposes of operational objective 2 set out in Article 4(2), point (b) (‘grow quantum systems’), a limited number of Quantum Technology and Innovation Hubs shall be established in the Union.
2. To support the development of SMEs active in the quantum field and of individual innovators, the Quantum Technology and Innovation Hubs shall provide: (a) specialised technical or engineering expertise and services, which enable SMEs
to address their major technological and engineering bottlenecks; (b) access to the quantum infrastructures necessary for their activities, including
for testing and experimentation facilities and specialised equipment and tools; (c) access to dedicated talent and skills, and deliver specialised engineering
training, as well as adoption and integration support linked to those facilities and infrastructures.
EN 42 EN
3. Services and access to relevant facilities and infrastructures shall be made available to users which are Union-controlled entities. The conditions of access shall ensure the protection of confidential information, trade secrets and intellectual property rights. Preferential access or reduced fees may be provided to SMEs, start-ups, universities and research organisations active in the quantum field.
4. Quantum Technology and Innovation Hubs shall be selected through open, transparent and competitive procedures. The call for applications shall identify the technological or application areas in which those hubs are to be established, to cover complementary domains and address identified capability gaps.
5. The Quantum Technology and Innovation Hubs shall form a coordinated Union network and shall coordinate their services, as well as with the services provided by the quantum competence and acceleration centres referred to in Article 17.
Article 15 European Quantum Regions of Excellence
1. The Commission may, by means of implementing acts, designate a European Quantum Region of Excellence and award a label, upon application by a regional authority, subject to endorsement by the respective Member State.
2. The application shall include a development plan for the candidate Quantum Region of Excellence setting out a strategic vision for the further development of the regional quantum ecosystem. The development plan shall describe the strengths and complementarities of the existing regional quantum ecosystem and its potential for further development, in particular with regard to the following: (a) quantum research and innovation; (b) added value for quantum enterprises and relevant industrial capabilities; (c) the availability of skills and capacity to attract talent; (d) the existence of Quantum Technology and Innovation Hubs or testing and
experimentation infrastructures. 3. The Commission shall assess the application on the basis of the coherence and
credibility of the development plan for the candidate Quantum Region of Excellence, the strength of the existing regional quantum ecosystem, and the commitment to further development.
4. The label referred to in paragraph 1 shall be granted for a period of five years and may be renewed where the region still meets the conditions set out in this Article, taking into account progress in implementing the development plan.
5. The Commission shall publish the list of designated European Quantum Regions of Excellence and may promote their visibility through relevant Union initiatives. Without prejudice to the applicable rules governing Union programmes and instruments, the label may be taken into account when assessing and selecting operations proposed under Union funding programmes.
Article 16 Network of European Quantum Regions of Excellence
1. A Network of European Quantum Regions of Excellence (‘the Quantum Regions Network’) is established.
EN 43 EN
2. The Quantum Regions Network shall organise its work autonomously. It may establish its own working methods, including organising meetings, the designation of a Chair on a rotating basis among participating regions, and the adoption of informal arrangements to facilitate cooperation and information exchange.
3. The Quantum Regions Network shall bring together regions awarded the European Quantum Regions of Excellence label pursuant to Article 15. Participation in the Quantum Regions Network shall follow automatically from the award of that label, without a separate selection procedure. The Quantum Regions Network shall have the following objectives: (a) to facilitate cooperation and exchange of best practices among quantum regions
of excellence; (b) to promote the Quantum Regions Network and its activities among member
and non-member regions through outreach, communication and dissemination activities to increase visibility and participation;
(c) to promote synergies and complementarities between regional quantum ecosystems, including across different segments of the value chain;
(d) to enhance the visibility and attractiveness of European Quantum Regions of Excellence for private investment and international partnerships;
(e) to facilitate cooperation, where relevant, with the quantum excellence network referred to in Article 5, the Quantum Technology and Innovation Hubs referred to in Article 14, and the quantum competence and acceleration centres referred to in Article 17, in particular to support the transfer of scientific and technological knowledge into regional industrial ecosystems.
4. The Commission may organise meetings of the Quantum Regions Network, workshops or other activities to support information exchange and cooperation among participating regions.
Article 17 Quantum competence and acceleration centres
1. For the purposes of operational objective 5 set out in Article 4(2), point (e) (‘think and adopt quantum’), each Member State shall establish at least one quantum competence and acceleration centre (‘acceleration centre’) through an open and transparent call for applications. Each Member State may establish acceleration centres jointly with other Member States and partner countries.
2. The acceleration centres shall be established as a first-level access point for private and public sector entities. The acceleration centres shall support such entities in identifying relevant applications, finding suitable providers of technical and business support, and providing information on accessing quantum infrastructures, skills, and on finance, suppliers and procurement opportunities. This information shall be provided on an equal and non-discriminatory basis.
3. The acceleration centres shall perform at least the following activities to the benefit of the relevant stakeholders and in close cooperation with them, across the quantum value chain: (a) provide information on available private and public investment opportunities
and financial support mechanisms;
EN 44 EN
(b) facilitating access to initial technical and business support necessary for the assessment, development and deployment of quantum technologies, and providing general technical information on such support;
(c) promoting synergies with innovation ecosystems and helping users by referring them to the Quantum Technology and Innovation Hubs referred to in Article 14, where applicable;
(d) supporting the development of quantum skills and talent in the Union through education, training and adoption support, upskilling and reskilling, especially for early adopters of quantum technologies and SMEs, and strengthening links between students, workers, education and training institutions, and quantum entities.
4. Member States shall designate candidate acceleration centres in accordance with their national procedures. When designating such centres, Member States may decide to base them on existing national, regional or sectoral structures.
Article 18 Standardisation, benchmarking and interoperability for quantum technologies
1. The Commission may support European and international standardisation, benchmarking and interoperability activities in the field of quantum technologies, taking into account existing Union and international activities and roadmaps. Such support shall address emerging needs and priorities, promote interoperability, and trustworthy deployment, and facilitate common terminology, interfaces, reference architectures, testing and validation methods, performance metrics, and technical specifications.
2. The European Quantum Alliance referred to in Article 32 may provide input to the standardisation, benchmarking and interoperability activities and their prioritisation.
Article 19 Voluntary quantum technology labelling scheme
1. The Commission shall encourage the development and uptake of voluntary labelling schemes intended for use across the Union for quantum technologies, components, products, services or systems. The schemes shall enable economic operators to provide reliable and verifiable information on the provenance, traceability and, where relevant, interoperability of such technologies, components and products.
2. The voluntary labelling scheme referred to in paragraph 1 may be developed, operated and governed by manufacturers, suppliers or other economic operators involved in the quantum value chain, individually or through organisations representing them, or by relevant metrology, testing or other bodies, including in cooperation with the relevant industry. The entities responsible for a scheme shall determine the applicable criteria, governance arrangements and verification mechanisms.
3. The voluntary labelling scheme referred to in paragraph 1 shall be based on clear, transparent and verifiable criteria, taking into account relevant standards and standardisation deliverables, available technical solutions and industry best practices. It shall be proportionate to the characteristics and maturity of the technologies and supply chains concerned.
EN 45 EN
SECTION 4
PROCUREMENT
Article 20 Procurement-related measures for quantum technologies
1. In public procurement procedures covered by Regulation (EU) 202X/XXX [Public Procurement Act] and concerning quantum technology products and services contracting authorities and contracting entities shall include requirements relating to the security of supply, interoperability, and lifecycle support of the tendered products or services, using, as appropriate, technical specifications, award criteria or contract performance conditions.
2. Public procurement procedures referred to in paragraph 1 shall be restricted to quantum technology products and services provided by Union-controlled entities and entities authorised to participate pursuant to Article 31. The same requirements shall apply to subcontractors and groups of economic operators. In the case of groups of economic operators, the majority of their members shall be Union-controlled entities.
3. For the purposes of this Regulation, an entity shall be deemed to provide a quantum technology product or service if it performs substantial development, manufacturing or processing of the product or service.
4. The Commission may, by means of implementing acts, further specify that certain quantum components which are critical for security interests of a quantum technology product or service shall be provided exclusively by Union-controlled entities. Such critical quantum components shall be identified based on the list established pursuant to Article 28 and on their availability in the Union. These implementing acts shall be adopted in accordance with the examination procedure referred to in Article 34(2).
5. In addition to the requirements referred to in paragraph 2 of this Article, for public procurement of innovation within the meaning of Article 60 of Regulation (EU) 202X/XXX [Public Procurement Act] that relates to quantum technology products and services, contracting authorities and contracting entities shall include, among the award criteria relating to quality, criteria to assess the tenderer's contribution to the development of the Union quantum ecosystem.
Article 21 Procurement of post-quantum cryptography solutions
1. Public administration entities, as defined in Article 6(35) of Directive (EU) 2022/2555, which are in the scope of that Directive pursuant to Article 2(2), point (f), or Article 2(5), point (a), thereof, shall ensure that, in procurement procedures initiated on or after [OP: please insert the date falling six months after the entry into force of this Regulation], concerning products or services with digital elements identified in accordance with the criteria set out in paragraph 3, contracts are awarded only for products and services that support post-quantum cryptography and crypto-agility.
EN 46 EN
2. The Commission shall adopt implementing acts that set out the technical requirements under which products or services can be deemed to support post- quantum cryptography and crypto-agility. These implementing acts shall take into account the list of cryptographic mechanisms entitled “Agreed Cryptographic Mechanisms”, drawn up by the European Cybersecurity Certification Group, Sub- group on Cryptography and published by the European Union Agency for Cybersecurity (‘ENISA’).
3. Products or services referred to in paragraph 1 shall be identified in accordance with the criticality of the systems of which they form part, based on the following criteria: (a) the sensitivity of the handled data, their importance for the performance of the
relevant functions of the entity and their potential value to malicious actors; (b) time and effort required for migration of the system concerned; and (c) the potential societal and economic impact of a compromise of the system
concerned. 4. Where suitable post-quantum cryptographic solutions are not yet available for a
specific function, contracts may be awarded only if the products and services support crypto-agility and include a documented migration plan.
5. Where crypto-agility is not technically feasible for specific components or functions, the contracting authority or entity may grant a limited exception on the basis of a documented technical and security-risk assessment demonstrating that no suitable secure alternative exists. Such exceptions shall be limited to the components or functions affected and shall require compensating security measures and, where relevant, time-bound milestones for upgrading or replacement, without waiving applicable post-quantum cryptography requirements. Cost considerations alone shall not justify the exceptional award of a contract.
6. Member States shall take measures to encourage public administration entities other than those referred to in paragraph 1 to restrict procurements to products or services which support post-quantum cryptography and crypto-agility.
7. Post-quantum cryptography solutions developed and deployed pursuant to this Regulation shall, where appropriate, be interoperable with the European Union Critical Communication System (EUCCS), referred to in Regulation (EU) 202X/XXX [insert reference to EUCCS once adopted].
SECTION 5
IMPLEMENTATION
Article 22 Implementation
1. The Quantum Europe Framework Initiative referred to in Article 4 of this Regulation shall be implemented by the EuroHPC Joint Undertaking, in accordance with Regulation (EU) 2021/1173, unless otherwise provided for in this Regulation or, where the Commission decides to implement the relevant actions directly or to entrust their implementation to other bodies responsible for implementing relevant Union programmes and instruments, in accordance with the applicable legal
EN 47 EN
framework. That implementation shall not affect the implementation of actions related to quantum set out in Regulation (EU) 202X/XXX [insert reference to Chips Act 2.0 once adopted] through the Chips Joint Undertaking.
2. The Quantum Europe Framework Initiative shall be implemented at Union level, where necessary, in consultation with the Quantum Strategy Board.
3. The Quantum Europe Framework Initiative shall be funded by relevant Union programmes supporting quantum and post-quantum technologies. Such funding may be complemented by contributions from Member States and by other public and private sources, in accordance with applicable Union and national law.
4. Article 9(4), Article 11(3) and Article 20(2) shall apply in a complementary and coherent manner with the rules governing Union programmes, without prejudice to the specific provisions applicable to those programmes. In the event of a conflict between Article 9(4), Article 11(3) or Article 20(2) and a provision applicable to the relevant Union programme or programme, the latter shall prevail to the extent of that conflict.
Article 23 Equity investment vehicle for financial support to sovereign technologies – Sovereign Tech
Equity Fund 1. The Union may establish and implement an equity investment vehicle for the
financial support of technologies referred to in Article 1(1), point (b) (the ‘vehicle’). The vehicle shall be established and implemented in accordance with the rules of Regulation (EU) 2024/2509, and during the period of the MFF 2028-2034, with the rules of the ECF InvestEU Instrument established in section 2 of Chapter I of Regulation (EU) 202X/XXX [insert reference to ECF once adopted] in complementarity with existing financial support instruments. The Union may participate in the vehicle as a shareholder together with the Member States and other public or private investors. The vehicle may be established in line with the requirements to be an implementing partner of the ECF InvestEU Instrument.
2. Member States shall be able to support the vehicle, including through contributions from relevant Union programmes, subject to the rules of the relevant programmes.
Chapter III Strengthening the Union’s Quantum Resilience
SECTION 1
POST-QUANTUM CRYPTOGRAPHY
Article 24 Monitoring and preparedness for post-quantum cryptography
1. Member States shall ensure the timely implementation of their commitments in accordance with the coordinated implementation roadmap on post-quantum cryptography.
EN 48 EN
2. The Commission shall monitor such progress by using existing cooperation structures and the ongoing work relating to the coordinated implementation roadmap on post-quantum cryptography.
3. Member States shall notify the Commission of their level of preparedness with regard to the transition to post-quantum cryptography. Member States and their national competent authorities shall provide the Commission with relevant information on such preparedness for assessment by [six months from the date of entry into force of this Regulation] and annually thereafter.
4. The Commission shall monitor research and technological developments in post- quantum cryptography, quantum and classical cryptanalysis and quantum computing to inform Union initiatives and the transition to post-quantum cryptography in the Union.
5. Where the Commission, based on its findings pursuant to paragraphs 2 to 4, concludes that binding requirements are necessary to ensure a timely and coordinated transition to post-quantum cryptography across the Union, in particular in light of significant delays in the deployment of available post-quantum cryptographic solutions and changes in the security level of cryptographic schemes, it may adopt delegated acts in accordance with Article 33 to supplement this Regulation by establishing specific milestones and timelines for that transition. Those delegated acts shall take into account the criticality of the systems concerned, and the time required for migration.
Article 25 Measures in support of the transition to post-quantum cryptography
The Commission shall, through existing national structures and arrangements, facilitate coordination among entities in sectors of high criticality listed in Annex I to Directive (EU) 2022/2555 and in other critical sectors listed in Annex II to that Directive to meet the objectives and milestones set out in the coordinated implementation roadmap for the transition to post-quantum cryptography, or any successor instrument.
Article 26 Standardisation, benchmarking and interoperability for post-quantum cryptography
The Commission may support European and international standardisation, benchmarking and interoperability activities in the field of post-quantum cryptography, taking into account Union and international initiatives and roadmaps.
SECTION 2
MONITORING AND RESILIENCE
Article 27 Strategic intelligence and dependency monitoring
1. The Commission shall carry out strategic intelligence and dependency monitoring for the purposes of this Regulation. That monitoring shall consist of the following activities:
EN 49 EN
(a) identifying and mapping the capabilities, activities and technological maturity of the entities active in the Union quantum value chain;
(b) identifying the most relevant quantum supply and value chains; (c) monitoring the roles of the entities referred to in point (a) across the quantum
value and supply chain; (d) identifying dependencies, bottlenecks, and other vulnerabilities affecting the
development, scale-up, deployment and uptake of quantum technologies in the Union;
(e) supporting early warning, preparedness and risk assessment activities in relation to disruptions affecting the quantum technology sector.
2. In carrying out the monitoring activities referred to in paragraph 1, the Commission shall cooperate with the Member States and shall involve relevant stakeholders, including providers and users of quantum technologies, contracting authorities and contracting entities, system integrators, research and technology organisations, SMEs and start-ups.
3. Where the Commission concludes that the Union’s quantum ecosystem would benefit from the establishment of a digital twin of the quantum supply chain, it may adopt implementing acts laying down harmonised provisions for establishing a market intelligence platform. The implementing acts referred to in the first subparagraph of this paragraph shall be adopted in accordance with the examination procedure referred to in Article 34(2).
4. Where appropriate and technically feasible, and without prejudice to the specific objectives of Regulation (EU) 202X/XXX [insert reference to Chips Act 2.0 Regulation once adopted], the market intelligence platform referred to in paragraph 3 of this Article may be integrated with the Business-to-Business Supply Chain Platform referred to in Article 33 of Regulation (EU) 202X/XXX [insert reference to Chips Act 2.0 Regulation once adopted].
Article 28 Critical quantum components and entities
1. The Commission shall establish and regularly update a list of critical quantum components and entities that are of strategic importance for the Union’s quantum capacities and capabilities and that are at risk of supply disruption.
2. Where necessary and proportionate, the list referred to in paragraph 1 shall be used for the following purposes: (a) monitoring dependencies and vulnerabilities in the quantum supply-chain; (b) establishing early warning and alert arrangements; (c) carrying out risk assessments, scenario exercises and contingency planning; (d) supporting the diversification of sources of supply; (e) identifying investment priorities; (f) identifying certain critical components for which specific requirements for
public procurements shall be introduced pursuant to Article 20(4).
EN 50 EN
3. The Commission shall identify shortages in labour and expertise and to support actions in the areas of education, training, reskilling and talent development. For those purposes, the Commission shall monitor the skills needs relating to the critical quantum components and entities referred to in paragraph 1.
4. Critical quantum components referred to in paragraph 1 shall be identified on the basis of an assessment of their importance for the Union’s quantum value and supply chains, taking into account their availability, substitutability and concentration of supply and, where relevant, the capabilities or position of entities involved in their development, manufacturing or supply. Such assessment may include risks arising from acquisitions by third-country entities or the relocation of relevant activities outside the Union.
Chapter IV
Governance
SECTION 1
QUANTUM STRATEGY BOARD
Article 29 Establishment and tasks of the Quantum Strategy Board
1. A Quantum Strategy Board is established. 2. The Quantum Strategy Board shall provide the Commission with advice and
assistance on measures to strengthen the Union’s quantum ecosystem and on Union quantum policy. It shall also facilitate coordination and support the consistent and effective application of this Regulation, in particular by carrying out the following tasks: (a) facilitating cooperation among Member States and exchange of information on
issues relating to this Regulation; (b) providing advice on a strategy on the Union quantum policy; (c) providing advice on matters in this Regulation, including on the Quantum
Europe Framework Initiative and the operational objectives set out in Article 4; (d) advising the Commission on post-quantum cryptography, interoperability,
testing, standardisation, and labelling for quantum technologies; (e) identifying new areas for strategic quantum infrastructures referred to in
Article 9 and strategic projects referred to in Article 11; (f) advising the Commission on international cooperation and strategic
partnerships related to quantum technologies referred to in Article 31. 3. The Quantum Strategy Board shall ensure structured cooperation with the NIS
Cooperation Group, ENISA, the European Cybersecurity Certification Group
EN 51 EN
established by Article 62 of Regulation (EU) 2019/881 of the European Parliament and of the Council72, and, where appropriate, other relevant cybersecurity bodies.
Article 30 Structure and operation of the Quantum Strategy Board
1. The Quantum Strategy Board shall be composed of high-level representatives from all Member States and shall be chaired by a representative of the Commission. The Commission shall provide administrative and secretariat support for the activities of the Quantum Strategy Board.
2. The Quantum Strategy Board may establish standing or temporary sub-groups for the purpose of examining specific questions. Member States shall nominate appropriate representatives with specific relevant technical expertise in accordance with the specific mandate of the sub-group.
3. The Quantum Strategy Board shall adopt its rules of procedure on a proposal from the Chair by simple majority of its members. The rules of procedure shall govern the convening of meetings, the preparation of agendas, the decision-making process, and the functioning of sub-groups.
SECTION 2
INTERNATIONAL COOPERATION ON QUANTUM TECHNOLOGIES
Article 31 International cooperation and strategic partnerships on quantum technologies
1. The Quantum Strategy Board shall advise the Commission on matters relating to international cooperation with partner countries and in multilateral forums in the field of quantum technologies, and shall, for that purpose, periodically discuss, in particular, the following topics: (a) the extent to which the international cooperation of the Union in the field of
quantum technologies including strategic partnerships on quantum technologies, including in international forums contributes to the following objectives: (i) reducing strategic dependencies and strengthening the security of supply
and resilience of the Union quantum supply chain; (ii) enhancing cooperation along the quantum value chain between the Union
and partner countries, including in the field of research and innovation; (iii) addressing shortages and mismatches in knowledge and skills by
attracting, mobilising and retaining talent in the Union; (b) the coherence and potential synergies between, bilateral cooperation between
Member States, partner countries and multilateral organisations, on the one hand, and actions carried out by the Union in the context of international
72 Regulation (EU) 2019/881 of the European Parliament and of the Council of 17 April 2019 on ENISA
(the European Union Agency for Cybersecurity) and on information and communications technology cybersecurity certification and repealing Regulation (EU) No 526/2013 (Cybersecurity Act) (OJ L 151, 7.6.2019, p. 15, ELI: http://data.europa.eu/eli/reg/2019/881/oj).
EN 52 EN
cooperation in the field of quantum technologies, including strategic partnerships on quantum technologies, on the other hand;
(c) the partner countries to be prioritised for partnerships on quantum technologies.
2. The Commission shall facilitate and support the cooperation between the Quantum Strategy Board and other relevant coordination forums, including those established under the Global Gateway framework.
3. Member States and the Commission shall strengthen bilateral cooperation with partner countries and the Union’s international cooperation in the field of quantum technologies, including non-binding strategic partnerships. Member States shall also support the Commission in the implementation of measures adopted in that context.
4. Where a partner country is associated with a Union funding programme providing financing for quantum activities, including strategic projects, and the applicable association agreement provides for reciprocal participation of Union-controlled entities in comparable activities, entities established in that partner country may be eligible to participate in the activities concerned, subject to the conditions and restrictions laid down in the association agreement.
5. The eligibility to participate referred to in paragraph 4 of this Article shall be without prejudice to the restrictions laid down in the applicable Union programme rules, including Regulation (EU) 202X/XXX [FP10 proposal] and Regulation (EU) 202X/XXX [ECF proposal]. Where permitted by the applicable Union programme rules and subject to the applicable association agreement, the Commission may restrict participation in or access to specific activities, impose additional requirements on such participation or access, or exclude entities from that third country from those activities, where strictly necessary to protect the Union’s security or essential strategic interests.
6. For strategic quantum infrastructures referred to in Article 9, access by entities established in third countries shall be subject to the relevant Union programme and, where relevant, the rules governing the EuroHPC Joint Undertaking. In accordance with those rules, access to specific activities may be restricted where strictly necessary to protect the Union’s security or essential strategic interests.
7. Where a partner country is not covered by paragraph 4 or 6, but the Union has established or participates in a strategic partnership with a third country in the field of quantum technologies, and such partnership provides for the possibility of reciprocal participation in quantum activities, the Commission may authorise entities established in that third country, or entities that do not qualify as Union-controlled entities, to have access to strategic quantum infrastructures or to participate in strategic projects. Such access or participation may be authorised where all the following conditions are fulfilled: (a) it is in the Union’s interest and provides clear added value to the activity
concerned; (b) it does not pose a risk to the security, resilience or technological interests of the
Union; and
EN 53 EN
(c) it is subject, where necessary, to conditions concerning access to results, intellectual property, security of information, supply-chain resilience and exploitation of results in the Union.
8. Where the Union has made or makes relevant commitments to a partner country under an agreement in the area of public procurement which cover the provision of quantum technology products, systems and services, legal entities established and controlled in that partner country shall be entitled to participate in the respective public procurement procedures. Such participation shall be without prejudice to the use of exceptions provided for under the applicable agreement or other applicable justifications for restrictions, in particular relating to the protection of security interests. Where no such commitments exist or apply, the reciprocal participation in procurement activities related to quantum technology may be authorised on the basis of the strategic partnerships referred to in paragraph 7, subject to appropriate safeguards.
SECTION 3
EUROPEAN QUANTUM ALLIANCE
Article 32 European Quantum Alliance
1. A European Quantum Alliance (the ‘Alliance’) is established. 2. The Alliance shall bring together relevant stakeholders and shall assist the
Commission and the Member States on matters relevant to the quantum industry of the Union and to identify current geopolitical, technological, market and industry developments in quantum technologies.
3. The Alliance shall engage in a regular strategic dialogue with the Quantum Strategy Board. The Quantum Strategy Board may request input from the Alliance on matters falling within its tasks.
4. In carrying out its tasks referred to in paragraph 2, the Alliance shall in particular: (a) identify dependencies, gaps and opportunities across the quantum value chain,
including as regards critical components or entities; (b) set up a demand forum to promote market uptake and cross border
cooperations, industrial partnerships and pilot deployments. 5. The demand forum referred to in paragraph 4, point (b), shall in particular have the
following tasks: (a) facilitate the showcasing of quantum technologies and the matchmaking
between providers of quantum technologies, quantum technology facilities or strategic projects and potential public and private users and purchasers;
(b) identify user needs, expected demand, and obstacles of a factual or economic nature affecting end-user demand, market uptake and public procurement, on the basis of aggregated or industry-wide information, without facilitating the exchange of commercially sensitive information or the coordination of the commercial strategies of undertakings.
EN 54 EN
6. The Commission shall appoint the members of the Alliance. The members of the Alliance shall be representatives of the quantum value and supply chain in the Union, including developers, manufacturers, suppliers and users of quantum technologies, and shall fulfil all the following criteria: (a) they have demonstrated experience, knowledge and capabilities in quantum
technologies, including, where relevant, in their development, production, deployment or use;
(b) they have a relevant presence in the Union or have committed to establishing such a presence in the Union; and
(c) where relevant, they contribute, or have committed to contribute, to the resilience of the quantum value chain.
7. A representative of the Commission shall chair the Alliance. 8. The Alliance shall adopt its rules of procedure on a proposal from the Chair by
simple majority of its members. The rules of procedure shall govern the convening of meetings, the preparation of agendas, the decision-making process and the functioning of the standing or temporary working groups
9. The Alliance shall meet in plenary assembly at least once a year. It may hold extraordinary meetings at the request of its Chair. The Chair shall convene the meetings and draw up the agenda in accordance with the rules of procedure of the Alliance and with its tasks pursuant to this Article.
10. The Alliance may establish, standing or temporary working groups to examine specific questions. The establishment of such working groups shall be subject to the approval of the Chair.
Chapter V Delegation of Power and Committee Procedure
Article 33 Exercise of the delegation
1. The power to adopt delegated acts is conferred on the Commission subject to the conditions laid down in this Article.
2. The power to adopt delegated acts referred to in Article 6(2), Article 7(3), Article 10(2), Article 12(2), and Article 24(5) shall be conferred on the Commission for an indeterminate period of time from [OP: insert date of entry into force].
3. The delegation of power referred to in Article 6(2), Article 7(3), Article 10(2), Article 12(2), and Article 24(5) may be revoked at any time by the European Parliament or by the Council. A decision to revoke shall terminate the delegation of the power specified in that decision. It shall take effect on the day following that of its publication in the Official Journal of the European Union or at a later date specified therein. It shall not affect the validity of any delegated acts already in force.
4. Before adopting a delegated act, the Commission shall consult experts designated by each Member State in accordance with the principles laid down in the Interinstitutional Agreement of 13 April 2016 on Better Law-Making. As soon as it adopts a delegated act, the Commission shall notify it simultaneously to the European Parliament and to the Council.
EN 55 EN
5. A delegated act adopted pursuant to Article 6(2), Article 7(3), Article 10(2), Article 12(2), and Article 24(5) shall enter into force only if no objection has been expressed either by the European Parliament or by the Council within a period of two months of notification of that act to the European Parliament and the Council or if, before the expiry of that period, the European Parliament and the Council have both informed the Commission that they will not object. That period shall be extended by two months at the initiative of the European Parliament or of the Council.
Article 34 Committee procedure
1. The Commission shall be assisted by a committee. The Committee shall be a committee within the meaning of Regulation (EU) No 182/2011.
2. Where reference is made to this paragraph, Article 5 of Regulation (EU) No 182/2011 shall apply.
Chapter VI Final Provisions
Article 35 Treatment of confidential information
1. The Commission and the Member States, and any other natural or legal person involved in the application of this Regulation shall ensure the confidentiality of information and data obtained in carrying out their tasks. In particular, they shall protect personal data, intellectual property rights and commercially sensitive information or trade secrets.
2. The information collected pursuant to this Regulation shall be made accessible to national statistical authorities and to Eurostat for the sole purpose of compiling European statistics in accordance with Regulation (EC) 223/2009 of the European Parliament and Council73, ensuring statistical confidentiality.
Article 36 Evaluation and review
1. By [OP: insert date for five years after date of entry into force of this Regulation], the Commission shall submit a report on the evaluation and review of this Regulation to the European Parliament and to the Council. The report shall be made public.
2. For the purposes of the evaluation and review of this Regulation, the Quantum Strategy Board, the Member States and national competent authorities shall provide the Commission with information upon request.
73 Regulation (EC) No 223/2009 of the European Parliament and of the Council of 11 March 2009 on
European statistics and repealing Regulation (EC, Euratom) No 1101/2008 of the European Parliament and of the Council on the transmission of data subject to statistical confidentiality to the Statistical Office of the European Communities, Council Regulation (EC) No 322/97 on Community Statistics, and Council Decision 89/382/EEC, Euratom establishing a Committee on the Statistical Programmes of the European Communities (OJ L 87, 31.3.2009, pp. 164–173, ELI: http://data.europa.eu/eli/reg/2009/223/oj).
EN 56 EN
3. In carrying out the evaluation and review of this Regulation the Commission shall take into account the positions and findings of the Quantum Strategy Board, of the European Parliament, of the Council, and of other relevant bodies or sources.
Article 37 Entry into force
This Regulation shall enter into force on the twentieth day following that of its publication in the Official Journal of the European Union. This Regulation shall be binding in its entirety and directly applicable in all Member States. Done at Brussels,
For the European Parliament For the Council The President The President
EN 1 EN
LEGISLATIVE FINANCIAL AND DIGITAL STATEMENT 1. FRAMEWORK OF THE PROPOSAL/INITIATIVE ................................................. 3
1.1. Title of the proposal/initiative ...................................................................................... 3
1.2. Policy area(s) concerned .............................................................................................. 3
1.3. Objective(s) .................................................................................................................. 3
1.3.1. General objective(s) ..................................................................................................... 3
1.3.2. Specific objective(s) ..................................................................................................... 3
1.3.3. Expected result(s) and impact ...................................................................................... 3
1.3.4. Indicators of performance ............................................................................................ 3
1.4. The proposal/initiative relates to: ................................................................................. 4
1.5. Grounds for the proposal/initiative .............................................................................. 4
1.5.1. Requirement(s) to be met in the short or long term including a detailed timeline for roll-out of the implementation of the initiative ............................................................ 4
1.5.2. Added value of EU involvement (it may result from different factors, e.g. coordination gains, legal certainty, greater effectiveness or complementarities). For the purposes of this section 'added value of EU involvement' is the value resulting from EU action, that is additional to the value that would have been otherwise created by Member States alone. ................................................................................. 4
1.5.3. Lessons learned from similar experiences in the past .................................................. 4
1.5.4. Compatibility with the multiannual financial framework and possible synergies with other appropriate instruments ....................................................................................... 5
1.5.5. Assessment of the different available financing options, including scope for redeployment ................................................................................................................ 5
1.6. Duration of the proposal/initiative and of its financial impact .................................... 6
1.7. Method(s) of budget implementation planned ............................................................. 6
2. MANAGEMENT MEASURES .................................................................................. 8
2.1. Monitoring and reporting rules .................................................................................... 8
2.2. Management and control system(s) ............................................................................. 8
2.2.1. Justification of the budget implementation method(s), the funding implementation mechanism(s), the payment modalities and the control strategy proposed .................. 8
2.2.2. Information concerning the risks identified and the internal control system(s) set up to mitigate them............................................................................................................ 8
2.2.3. Estimation and justification of the cost-effectiveness of the controls (ratio between the control costs and the value of the related funds managed), and assessment of the expected levels of risk of error (at payment & at closure) ........................................... 8
2.3. Measures to prevent fraud and irregularities ................................................................ 9
3. ESTIMATED FINANCIAL IMPACT OF THE PROPOSAL/INITIATIVE ............ 10
3.1. Heading(s) of the multiannual financial framework and expenditure budget line(s) affected ....................................................................................................................... 10
EN 2 EN
3.2. Estimated financial impact of the proposal on appropriations ................................... 12
3.2.1. Summary of estimated impact on operational appropriations .................................... 12
3.2.1.1. Appropriations from voted budget ............................................................................. 12
3.2.1.2. Appropriations from external assigned revenues ....................................................... 17
3.2.2. Estimated output funded from operational appropriations ......................................... 22
3.2.3. Summary of estimated impact on administrative appropriations ............................... 24
3.2.3.1. Appropriations from voted budget .............................................................................. 24
3.2.3.2. Appropriations from external assigned revenues ....................................................... 24
3.2.3.3. Total appropriations ................................................................................................... 24
3.2.4. Estimated requirements of human resources.............................................................. 25
3.2.4.1. Financed from voted budget....................................................................................... 25
3.2.4.2. Financed from external assigned revenues ................................................................ 26
3.2.4.3. Total requirements of human resources ..................................................................... 26
3.2.5. Overview of estimated impact on digital technology-related investments ................ 28
3.2.6. Compatibility with the current multiannual financial framework.............................. 28
3.2.7. Third-party contributions ........................................................................................... 28
3.3. Estimated impact on revenue ..................................................................................... 29
4. DIGITAL DIMENSIONS .......................................................................................... 29
4.1. Requirements of digital relevance .............................................................................. 30
4.2. Data ............................................................................................................................ 30
4.3. Digital solutions ......................................................................................................... 31
4.4. Interoperability assessment ........................................................................................ 31
4.5. Measures to support digital implementation .............................................................. 32
EN 3 EN
1. FRAMEWORK OF THE PROPOSAL/INITIATIVE 1.1. Title of the proposal/initiative
Regulation of the European Parliament and of the Council on a framework of measures for strengthening the Union’s quantum ecosystem (Quantum Act)
1.2. Policy area(s) concerned
A new plan for the Union’s sustainable prosperity and competitiveness, research and innovation, infrastructures, economic security and resilience.
1.3. Objective(s) 1.3.1. General objective(s)
The Quantum Act has two general objectives, as specified in the Explanatory Memorandum: First, to sustain the Union’s scientific and technological leadership and strengthen its competitiveness and industrial deployment capacity in quantum technologies by translating research excellence into manufacturable and deployable technologies, scaled Union’s firms and competitive products and services. Second, to improve the Union’s resilience, trusted and quantum-safe deployment, and economic security in strategically relevant quantum value chains and infrastructures.
1.3.2. Specific objective(s)
Specific objective No 1 Support quantum research and innovation activities for consolidating Union’s excellence across the Union to lead in quantum science and technology and transform the Union into a quantum industrial powerhouse and a global market leader in quantum technologies. Specific objective No 2 Support the scale-up and market uptake of innovative quantum technologies and solutions by strengthening access to finance, facilitating engagement with users, promoting public and private procurement, and accelerating industrial deployment across the Union. Specific objective No 3 Strengthen quantum value chain resilience, in particular by enabling the identification of strategic dependencies to prevent supply-chain disruptions, and support preparedness for the transition towards quantum-safe infrastructures and solutions.
1.3.3. Expected result(s) and impact Specify the effects which the proposal/initiative should have on the beneficiaries/groups targeted.
The competitiveness of the Union’s quantum ecosystem will improve and the ultimate goal is the reduction of strategic dependencies. The Union’s quantum industry should benefit from support to large-scale technological capacity building in emerging quantum technologies that will reinforce
EN 4 EN
the capabilities of the Union in industrial deployment. Industry should benefit as well from strategic projects in design and manufacturing. The Union’s quantum users in all sectors should benefit from increased security of supply of quantum technologies without disruptions and from efforts to promote closer relations with the quantum industry. In addition, critical sectors should benefit from enhanced security of supply of quantum technologies and preparedness for the transition to post-quantum cryptography (PQC).
1.3.4. Indicators of performance Specify the indicators for monitoring progress and achievements.
The measurable indicators to monitor the implementation of the Regulation towards the achievement of its general and specific objectives are the following: - EU–Member State programming/review cycles and follow-up to agreed priorities - Facility participation and utilisation; SME and cross-border access; progression to validation/qualification - Progress in the establishment of strategic quantum infrastructures - Companies financed; public/private capital mobilised; follow-on financing and progress of strategic projects - Reference deployments; progression from pilots to repeat procurement - People trained; mobility; users supported; skills-gap indicators - Common benchmarks/testing methods used; standards uptake; PQC implementation-coordination outputs - Critical inputs assessed; alternative suppliers qualified; mitigation actions; supply timeliness
1.4. The proposal/initiative relates to: a new action
a new action following a pilot project / preparatory action74
the extension of an existing action
a merger or redirection of one or more actions towards another/a new action 1.5. Grounds for the proposal/initiative 1.5.1. Requirement(s) to be met in the short or long term including a detailed timeline for
roll-out of the implementation of the initiative
The Regulation enters into force on the twentieth day following its publication in the Official Journal. Specific provisions set additional deadlines for certain measures, including those relating to PQC procurement. The indicative financial estimates in Section 3 assume a gradual implementation phase in 2028–2029, with the planned operational capacity reached from 2030. This does not affect the legal deadlines established by the Regulation.
74 As referred to in Article 58(2), point (a) or (b) of the Financial Regulation.
EN 5 EN
The Commission performs the governance, coordination, designation and monitoring tasks assigned to it. The Framework Initiative is implemented through the EuroHPC Joint Undertaking (JU), without prejudice to the responsibilities of Member States and subject to the JU's applicable legal mandate.
1.5.2. Added value of EU involvement (it may result from different factors, e.g. coordination gains, legal certainty, greater effectiveness or complementarities). For the purposes of this section 'added value of EU involvement' is the value resulting from EU action, that is additional to the value that would have been otherwise created by Member States alone.
Union action can add value in four main ways. First, alignment: by aligning Union and national priorities to focus resources where European scale is required, while allowing Member States to support areas reflecting their scientific and industrial strengths. Second, economies of scale: by enabling specialisation and shared access to costly infrastructure (e.g., pilot lines, testbeds), especially for start-ups, SMEs and users located in Member States lacking such facilities. Third, market leverage: by coordinating procurement and strengthening links between firms, users and investors, Union action can create stronger demand and give firms a larger home market in which to scale, while strengthening the Union’s collective position. Fourth, identifying and managing strategic dependencies: by aggregating information across firms, infrastructures and Member States, Union action can reveal concentration and chokepoints that would not be visible from a national perspective and facilitate coordinated diversification.
1.5.3. Lessons learned from similar experiences in the past
This is the first legislative instrument aiming to regulate quantum technologies at Union level. Union action is necessary to tackle fragmentation of national efforts and to complement national measures where objectives require critical mass, shared infrastructure, cross-border market formation or aggregated supply-chain visibility.
1.5.4. Compatibility with the multiannual financial framework and possible synergies with other appropriate instruments
The implementation of the Quantum Act would be entrusted to existing bodies, the mandate of which already covers quantum aspects. In particular, the EuroHPC JU, or its successor under the next Multiannual Financial Framework (MFF), would implement the quantum R&I and infrastructure actions falling within its legal and budgetary mandate. The initiative needs to be also seen in the context of the preparation of the next MFF, the proposed European Competitiveness Fund and the next Research Framework Programme. In particular, the Quantum Act would not create automatic funding entitlements but any planning ranges would be subject to the future MFF, programme legislation and individual funding decisions.
EN 6 EN
1.5.5. Assessment of the different available financing options, including scope for redeployment
Without prejudice to the outcome of negotiations on the next MFF, appropriations and staffing from 2028 onwards are indicative. The revised resource scenario differentiates ongoing responsibilities from new duties under the Quantum Act. The Commission staffing scenario comprises 25 FTEs. Existing staff would continue to support ongoing quantum research and innovation activities, established EuroHPC governance and programmes, EuroQCI and ongoing policy coordination. The additional statutory duties will be addressed through prioritisation and internal reallocation within constant Commission resources. EuroHPC JU staffing requirements are assessed separately.
EN 7 EN
1.6. Duration of the proposal/initiative and of its financial impact limited duration
– Limited duration dates: not applicable. – Limited duration financial period: not applicable.
unlimited duration – Implementation with a start-up period from 2028 to 2029, – followed by full-scale operation from 2030. Financial tables cover 2028-2034. The IA uses a separate 2028–2037 analytical horizon; it does not establish appropriations after 2034. Payments on existing commitments may continue after 2034 under the applicable agreements. 1.7. Method(s) of budget implementation planned
Direct management by the Commission – by its departments, including by its staff in the Union delegations; – by the executive agencies
Shared management with the Member States Indirect management by entrusting budget implementation tasks to:
– third countries or the bodies they have designated – international organisations and their agencies (to be specified) – the European Investment Bank and the European Investment Fund – bodies referred to in Articles 70 and 71 of the Financial Regulation – public law bodies – bodies governed by private law with a public service mission to the extent that they are provided with adequate financial guarantees – bodies governed by the private law of a Member State that are entrusted with the implementation of a public-private partnership and that are provided with adequate financial guarantees – bodies or persons entrusted with the implementation of specific actions in the common foreign and security policy pursuant to Title V of the Treaty on European Union, and identified in the relevant basic act – bodies established in a Member State, governed by the private law of a Member State or Union law and eligible to be entrusted, in accordance with sector-specific rules, with the implementation of Union funds or budgetary guarantees, to the extent that such bodies are controlled by public law bodies or by bodies governed by private law with a public service mission, and are provided with adequate financial guarantees in the form of joint and several liability by the controlling bodies or equivalent financial guarantees and which may be, for each action, limited to the maximum amount of the Union support. Comments
Quantum research, quantum grand challenges, quantum strategic infrastructures, hub and other funding actions may be implemented by the EuroHPC Joint Undertaking or its successor under indirect management only within its applicable mandate and programme legislation. The Joint Undertaking manages calls, awards, contracts and project monitoring
EN 8 EN
entrusted to it; it does not take the Commission's statutory strategic project designation decisions. The Commission retains direct responsibility for national-strategy alignment, Commission designation and withdrawal decisions on strategic projects, the Quantum Strategy Board and Alliance, monitoring and preparedness for post-quantum cryptography, strategic intelligence, critical-component assessment and oversight of implementation. Delegated acts and implementing acts are to be prepared only where the Quantum Act Proposal confers the relevant powers. Routine individual decisions and programme implementation should use existing procedures where legally possible.
EN 9 EN
2. MANAGEMENT MEASURES 2.1. Monitoring and reporting rules
This Statement includes expenditure for Commission staff and incremental implementation support. Standard expenditure rules apply. The Commission will report annually on Framework Initiative implementation and submit a public evaluation and review report five years after entry into force, in accordance with the proposal. Additionally, as a Union body, the EuroHPC Joint Undertaking functions under strict monitoring rules. Monitoring is performed through: - its own internal audit capacity and the audit service of the Commission; - the supervision of the Governing Board. The Executive Director will supervise the Joint Undertaking’s operations internally; - mid-term and final evaluations of the programme by external experts, under the supervision of the Commission; - the Joint Undertaking’s Work Programme and its Annual Activity Report. It can be expected that similar rules would apply to any successor, where relevant.
2.2. Management and control system(s) 2.2.1. Justification of the budget implementation method(s), the funding implementation
mechanism(s), the payment modalities and the control strategy proposed
The Regulation establishes a new policy framework for strengthening the Union quantum ecosystem and for enhancing the competitiveness and industrial deployment of quantum technologies, and strengthening economic security and resilience in strategically relevant quantum value chains and infrastructures. These objectives require reinforced Union-level coordination and operational capacity, which in turn require targeted and proportionate budgetary resources. The proposal introduces proportionate changes, establishing a governance coordination scheme with new Union-level tasks, while ensuring that decision-making remains at the most efficient level. The chosen governance model aims to build on existing structures and mandates, and allowing the budget to be implemented through established administrative and financial arrangements, ensuring cost effectiveness and predictability of expenditures. Commission implementation is based on 25 FTEs. These resources will in principle stem from internal redeployment within the DG, following a reprioritisation of existing activities. Payments follow the Financial Regulation, applicable funding agreements and annual budgets within the MFF ceilings. No fee financing is assumed. Expenditure is subject to ex ante checks, risk-based ex post controls, performance monitoring and reporting under the Commission and implementing-body internal control frameworks. For other parts, indirect management is justified because the EuroHPC Joint Undertaking is a public-private partnership with part of the co-financing brought in via contributions from Participating States and via in-kind contributions by private
EN 10 EN
members. Each year, the decision on the Union contribution to the EuroHPC Joint Undertaking will be taken by virtue of the Union budget adopted for that year. A Framework Financial Partnership Agreement signed between the European Commission and the EuroHPC Joint Undertaking will indicate that for the tasks to be carried out each year the Commission will pay a contribution upon conclusion of a contribution agreement with the EuroHPC Joint Undertaking, and the issuing, by the Joint Undertaking, of corresponding payment requests to the members other than the Union. The Commission will ensure that the rules applicable to the EuroHPC Joint Undertaking fully comply with the requirements of the Financial Regulation. In compliance with Article 71 of Regulation (EU, Euratom) 2024/2509, the Joint Undertaking will respect the principle of sound financial management. The EuroHPC Joint Undertaking shall also comply with the provisions of the Model Financial Regulation applicable to the Joint Undertaking. Any departure from this Model Financial Regulation, required for the purpose of the Joint Undertaking’s specific needs, shall be subject to the Commission’s prior consent. Oversight through Union representation in the competent governing bodies, applicable contribution agreements, annual activity reporting and audit arrangements supports Commission accountability to the College and Budgetary Authority. Each implementing body follows its own basic act.
2.2.2. Information concerning the risks identified and the internal control system(s) set up to mitigate them
This proposal is accompanied by an impact assessment report, which provides the analytics underpinning the chosen policy approach. The preparation of the initiative also drew on a public consultation as well as targeted consultations with industry stakeholders, Member States and trade associations, which ensured the collection of relevant data, information, and feedback. Nonetheless, unintentional consequences or unforeseen impacts may still occur during implementation. These will be identified through the monitoring procedures set out in the Regulation, allowing the Commission to address them in an appropriate and timely manner. Additionally, various measures have been established to mitigate the inherent risk of conflict of interest within the EuroHPC Joint Undertaking, especially: - conflict-of-interest prevention and management under the applicable basic act and financial rules; - documented approval and oversight of work programmes by the competent bodies; - separation of independent evaluation, funding decisions and beneficiary interests; - selection of the Executive Director by the Governing Board based on a proposal by the Commission, - independence of staff, - evaluations by independent experts based on published evaluation criteria together with appeal mechanisms and full declarations of any interests, - a requirement for the Governing Board to adopt rules for the prevention, avoidance and management of conflicts of interest in the Joint Undertaking in accordance with the financial rules of the Joint Undertaking and with the Staff Regulations in respect of staff.
EN 11 EN
The continuation of existing ethical and organisational values will be one of the key roles of the Joint Undertaking and will be monitored by the Commission. The Executive Director, as Authorising Officer, establishes a cost-effective internal control system and reports on its operation under the applicable financial rules. The Commission will monitor the risk of non-compliance through the reporting system that it will develop, as well as by following the results of ex post audits on the recipients of Union funds from the EuroHPC Joint Undertaking, as part of ex post audits covering the whole of the successor of Horizon Europe and the European Competitiveness Fund. There is a clear need to manage the budget in an efficient and effective manner, and to prevent fraud and waste. However, the control system needs to strike a fair balance between attaining an acceptable error rate and the control burden required and avoid lowering the attractiveness of the Union’s programmes.
2.2.3. Estimation and justification of the cost-effectiveness of the controls (ratio between the control costs and the value of the related funds managed), and assessment of the expected levels of risk of error (at payment & at closure)
Controls use the systems of the financing programmes and implementing bodies. No additional Quantum Act-specific control structure is created. Control-cost ratios and error estimates are monitored through annual activity reporting; no independent numerical rate is assumed before the future programme rules and portfolio are established. Risk-based controls will balance assurance with beneficiary burden.
2.3. Measures to prevent fraud and irregularities
The Commission will ensure that procedures to fight against fraud at all stages of the management process are applied by the EuroHPC Joint Undertaking. The Commission will ensure that appropriate measures are in place to ensure that, when actions financed under this Regulation are implemented, the financial interest of the Union is protected by the application of preventive measures against fraud, corruption and any other illegal activities, by effective checks and, if irregularities are detected, by the recovery of the amounts wrongly paid and, where appropriate, by effective, proportionate and deterrent penalties. The Court of Auditors shall have the power of audit, on the basis of documents and on-the-spot checks, over all grant beneficiaries, contractors and subcontractors who have received Union funds under the Programme. The European Anti-fraud Office (OLAF) may carry out on-the-spot checks and inspections on economic operators concerned directly or indirectly by such funding in accordance with the procedures laid down in Regulation (Euratom, EC) No 2185/96 with a view to establishing whether there has been fraud, corruption or any other illegal activity affecting the financial interests of the Union in connection with a grant agreement or grant decision or a contract concerning Union funding. The Joint Undertakings will also need to accede to the Interinstitutional Agreement of 25 May 1999 between the European Parliament, the Council of the European Union and the Commission of the European Communities concerning internal investigations by the European Anti- fraud Office (OLAF). The European Public Prosecutor’s Office may carry out investigations in accordance with the provisions and procedures laid down in Council
EN 12 EN
Regulation (EU) 2017/1939, with a view to investigating criminal offences affecting the financial interests of the Union.
EN 13 EN
3. ESTIMATED FINANCIAL IMPACT OF THE PROPOSAL/INITIATIVE The estimated impact on expenditure and staffing for 2028 and beyond is added for illustrative purposes only and does not pre-judge the next Multiannual Financial Framework. The source of financing and scope of Union financial commitment in the post-2027 period remain subject to the outcome of interinstitutional negotiations on the MFF 2028-2034 and thereafter shall be determined through the annual budgetary procedure. All appropriations and staffing allocations as of 2028 are indicative.
3.1. Heading(s) of the multiannual financial framework and expenditure budget line(s) affected
• Existing budget lines: no specific 2028–2034 identifiers are available at this stage. Budget nomenclature and line allocations remain subject to confirmation under the next MFF.
• New budget lines requested, no standalone Quantum Act line is presumed. The table identifies prospective programme allocations; future line numbers and third-country contributions follow the applicable budget nomenclature and programme association rules.
Heading of multiannual
financial framework
Budget line Type of expenditure Contribution
Number
Diff./Non- diff.
from EFTA
countries
from candidate countries
and potential
candidates
from other third
countries
other assigned revenue
ECF Diff. Program me rules
Programm e rules
Program me rules NO
FP 10
Diff. Program me rules
Programm e rules
Program me rules NO
EN 14 EN
3.2. Estimated financial impact of the proposal on appropriations 3.2.1. Summary of estimated impact on operational appropriations
The tables below quantify indicative gross implementation expenditure carried forward from the submitted LFDS: shared-capacity services, digital functions implementing-body delivery support. They are not the financing envelope for the entire Quantum Europe Framework Initiative. Wider research, quantum grand challenges, strategic quantum infrastructure, strategic projects, deployment, skills and horizontal actions are financed under the applicable Union programmes, work programmes and individual awards. Programme- resource planning ranges are reported separately in section 3.2.6 and are not mechanically added to these implementation estimates.
– The proposal/initiative does not require the use of operational appropriations – The proposal/initiative requires the use of operational appropriations, as explained below, as explained below.
3.2.1.1. Appropriations from voted budget EUR million (to three decimal places)
Heading of multiannual financial framework 2
DG CNECT Year Year Year Year Year Year Year TOTAL
MFF 2028- 2034
2028 2029 2030 2031 2032 2033 2034
Operational appropriations ECF
Commitments (1a) 1,500 1,500 4,000 2,500 2,500 2,500 2,500 17,000
Payments (2a) 1,125 1,350 3,375 2,625 2,650 2,500 3,375 17,000
FP10 Commitments (1b) 0,800 1,300 0,600 3,100 0,600 0,600 0,600 7,600
Payments (2b) 0,600 1,095 0,725 2,545 0,975 0,850 0,810 7,600
Appropriations of an administrative nature financed from the envelope of specific programmes Research staff BL (3) 2,379 2,379 2,379 2,379 2,379 2,379 2,379 16,653 TOTAL
appropriations Commitments =1a+1b+3 4,679 5,179 6,979 7,979 5,479 5,479 5,479 41,253
For DG <CONNECT…….>
Payments =2a+2b+3 4,104 4,824 6,479 7,549 6,004 5,729 6,564 41,253
EN 15 EN
EuroHPC JU Year Year Year Year Year Year Year TOTAL
2028-2034 2028 2029 2030 2031 2032 2033 2034 Staff expenditure 1,552 1,552 1,552 1,552 1,552 1,552 1,552 10,864
Infrastructure and operating expenditure
0,000
Operational expenditure 1,029 1,029 1,029 1,029 1,029 1,029 1,029 7,203
TOTAL of appropriations covered by the EU budget 2,581 2,581 2,581 2,581 2,581 2,581 2,581 18,067
An indicative amount of EUR 7.203 million over 2028–2034 (EUR 1.029 million annually) is envisaged for operational implementation support through the EuroHPC Joint Undertaking, subject to its applicable mandate and future programme and budgetary decisions. The separate requirement for eight additional JU FTEs and its associated staffing costs remains subject to confirmation. Year Year Year Year Year Year Year TOTAL
MFF 2028-2034
2028 2029 2030 2031 2032 2033 2034
TOTAL operational appropriations (including contribution to JU )
Commitments (4) 4,881 5,381 7,181 8,181 5,681 5,681 5,681 42,667
Payments (5) 4,306 5,026 6,681 7,751 6,206 5,931 6,766 42,667
TOTAL appropriations of an administrative nature financed from the envelope for specific programmes
(6) 2,379 2,379 2,379 2,379 2,379 2,379 2,379 16,653
TOTAL appropriations under HEADING <2….>
Commitments =4+6 7,260 7,760 9,560 10,560 8,060 8,060 8,060 59,320
of the multiannual financial framework Payments =5+6 6,685 7,405 9,060 10,130 8,585 8,310 9,145 59,320
EN 16 EN
Heading of multiannual financial framework 4 ‘Administrative expenditure’75
DG: CNECT Year Year Year Year Year Year Year TOTAL
MFF 2028-2034 2028 2029 2030 2031 2032 2033 2034
Human resources 1,676 1,676 1,676 1,676 1,676 1,676 1,676 11,732 Other administrative expenditure
TOTAL DG CNECT Appropriations
TOTAL appropriations under HEADING 4 of the multiannual financial framework
(Total commitments = Total payments)
1,676 1,676 1,676 1,676 1,676 1,676 1,676 11,732
EUR million (to three decimal places)
Year Year Year Year Year Year Year TOTAL
MFF 2028- 2034 2028 2029 2030 2031 2032 2033 2034
TOTAL appropriations under
HEADINGS 1 to 4 Commitments 71,072
of the multiannual financial framework Payments 8,361 9,081 10,736 11,806 10,261 9,986 10,821 71,072
The EUR 7.203 million (operational credits JU) delivery-support provision is EUR 1.029 million per year for tasks entrusted to existing implementing bodies: network and facility-service coordination; processing and quality assurance of implementation data; monitoring of funded actions; stakeholder and user support; and operational reporting. It is retained as a provisional aggregate provision from the submitted LFDS, not converted into an unsupported headcount estimate. It excludes Commission staff costed under Heading 4,
75 The necessary appropriations should be determined using the annual average cost figures available on the appropriate BUDGpedia webpage.
EN 17 EN
hub/centre service grants under the EUR 17.000 million line, and platform IT development and maintenance under the EUR 7.600 million line. Actual financing and cost categories follow programme allocations and the relevant contribution or service agreements. Annual commitments and payments are presented on the same-year basis used in the submitted LFDS. This is a simplifying implementation-cost assumption, not a forecast of pre-financing or settlement under individual agreements. Actual payments follow delivery milestones and applicable grant, contract or contribution terms; outstanding liabilities will be honoured beyond 2034 where necessary. All totals are calculated for the stated seven-year costing period. This provision is intended to cover operational implementation services, including coordination of shared facilities, technical support for calls and monitoring, data validation and user assistance. The annual amount remains provisional and will be validated against the expected volume of activities, required deliverables and eligible service costs. This operational provision excludes additional EuroHPC JU staff costs, which are assessed separately.
3.2.1.2. Appropriations from external assigned revenues
No assigned revenue is assumed for the quantified implementation-support scenario: EUR 0.000 million. 3.2.2. Estimated output funded from operational appropriations (not to be completed for decentralised agencies)
The table identifies outputs of the quantified support tranche. Shared quantum capacity contributes to Specific Objectives 1 and 2, while the Quantum Service Platform contributes primarily to Specific Objective 2. The remaining IA objectives are implemented through Commission tasks and relevant programme actions. Output counts describe costing assumptions, not legal selection of facilities or projects. The EUR 17 million estimate comprises 25 hub-years at EUR 0.5 million per hub-year and 15 centre-support tranches at EUR 0.3 million each. These are illustrative costing assumptions, not limits on the number of facilities or centres supported under the Regulation.
Commitment appropriations in EUR million (to three decimal places)
Indicate objectives and outputs
Year 2028
Year 2029
Year 2030
Year 2031 Years 2032, 2033 and 2034 TOTAL
OUTPUTS
EN 18 EN
Ty pe 76
Avera ge
cost
N o Cost N o Cost N o Cost N o Cost
N o
20 32
Cos t
203 2 N
o 20
33
Cost 2033
N o
20 34
Cost 2034
Total No
Total cost
Specific Objectives 1 and 2. Shared quantum capacity
and user support
- Technology and innovation hubs in
operation
Hu b- yr
0.500
– – – – 5 2.500 5 2.500 5 2.50 0
5 2.500 5 2.500 25 12.500
- Competence and acceleration centres
connected
Ce ntr e
0.300 5 1.500 5 1.500 5 1.500 – – – – – – – – 15 4.500
Subtotal for specific Objectives 1 and 2 1.500 1.500 4.000 2.500 2.50 0
2.500 2.500 17.000
Specific Objectives 1 and 2. Shared quantum capacity
and user support
Quantum- related digital
services, including Article 8 platform functions
(provisional scope and costs)
Pla tfo rm
n.a. 1 0.800 1 1.300 1 0.600 1 3.100 1 0.60 0
1 0.600 1 0.600 1 7.600
Subtotal for specific Objectives 1 and 2 0.800 1.300 0.600 3.100 0.60 0.600 0.600 7.600
76 Outputs are products and services to be supplied (e.g. number of student exchanges financed, number of km of roads built, etc.).
EN 19 EN
0
TOTALS 2.300 2.800 4.600 5.600 3.10 0
3.100 3.100 24.600
EN 20 EN
3.2.3. Summary of estimated impact on administrative appropriations – The proposal/initiative does not require the use of appropriations of an administrative nature – The proposal/initiative requires the use of appropriations of an administrative nature, as explained below 3.2.3.1. Appropriations from voted budget
VOTED APPROPRIATIONS Year Year Year Year Year Year Year TOTAL
2028 - 2034 2028 2029 2030 2031 2032 2033 2034
HEADING 4
Human resources 1,676 1,676 1,676 1,676 1,6761,6761,676 11,732
Other administrative expenditure 0,000 0,000 0,000 0,000 0,0000,0000,000 0,000
Subtotal HEADING 4 1,676 1,676 1,676 1,676 1,676 1,676 1,676 11,732 Outside HEADING 4
Human resources 2,379 2,379 2,379 2,379 2,3792,3792,379 16,653 Other expenditure of an administrative nature 0,000 0,000 0,000 0,000 0,0000,0000,000 0,000
Subtotal outside HEADING 4 2,379 2,379 2,379 2,379 2,379 2,379 2,379 16,653
TOTAL 4,055 4,055 4,055 4,055 4,055 4,055 4,055 28,385
The estimated impact on expenditure and staffing for 2028 and beyond is added for illustrative purposes only and does not pre-judge the next Multiannual Financial Framework. The source of financing and scope of Union financial commitment in the post-2027 period remain subject to the outcome of interinstitutional negotiations on the MFF 2028-2034 and thereafter shall be determined through the annual budgetary procedure. All appropriations and staffing allocations as of 2028 are indicative.
The appropriations required for human resources and other expenditure of an administrative nature will be met by appropriations from the DG that are already assigned to management of the action and/or have been redeployed within the DG, together, if necessary, with any additional allocation which may be granted to the managing DG under the annual allocation procedure and in the light of budgetary constraints.
3.2.3.2. Appropriations from external assigned revenues Administrative expenditure from assigned revenue: EUR 0.000 million 3.2.3.3. Total appropriations
TOTAL VOTED APPROPRIATIONS
+ EXTERNAL ASSIGNED
REVENUES
Year Year Year Year Year Year Year TOTAL 2028 - 2034 2028 2029 2030 2031 2032 2033 2034
HEADING 4
Human resources 1,676 1,676 1,676 1,676 1,6761,6761,676 11,732
Other administrative expenditure 0,000 0,000 0,000 0,000 0,0000,0000,000 0,000
Subtotal HEADING 4 1,676 1,676 1,676 1,676 1,676 1,676 1,676 11,732 Outside HEADING 4
Human resources 2,379 2,379 2,379 2,379 2,3792,3792,379 16,653 Other expenditure of an administrative nature 0,000 0,000 0,000 0,000 0,0000,0000,000 0,000
EN 21 EN
Subtotal outside HEADING 4 2,379 2,379 2,379 2,379 2,379 2,379 2,379 16,653
TOTAL 4,055 4,055 4,055 4,055 4,055 4,055 4,055 28,385
3.2.4. Estimated requirements of human resources – The proposal/initiative does not require the use of human resources – The proposal/initiative requires the use of human resources, as explained below 3.2.4.1. Financed from voted budget
Estimate to be expressed in full-time equivalent units (FTEs)
VOTED APPROPRIATIONS Year Year Year Year Year Year Year 2028 2029 2030 2031 2032 2033 2034
Establishment plan posts (officials and temporary staff)
Headquarters and Commission representations - line to be confirmed
7 7 7 7 7 7 7
Budget line to be confirmed (EU Delegations) – – – – – – –
(Indirect research) 9 9 9 9 9 9 9
(Direct research) – – – – – – –
Other budget lines (specify) – – – – – – –
External staff (inFTEs)
Contract agents - line to be confirmed 3 3 3 3 3 3 3 Budget line to be confirmed (AC, AL, END and JPD in the
EU Delegations) – – – – – – –
Admin. Support line
Programme support
line
at Headquarters – – – – – – –
in EU Delegations – – – – – – –
(AC, END - Indirect research) 6 6 6 6 6 6 6
(AC, END - Direct research) – – – – – – –
Other budget lines (specify) - Heading 4 – – – – – – –
Other budget lines (specify) - Outside Heading 4 – – – – – – –
TOTAL 25 25 25 25 25 25 25
The estimated impact on expenditure and staffing for 2028 and beyond is added for illustrative purposes only and does not pre-judge the next Multiannual Financial Framework. The source of financing and scope of Union financial commitment in the post-2027 period remain subject to the outcome of interinstitutional negotiations on the MFF 2028-2034 and thereafter shall be determined through the annual budgetary procedure. All appropriations and staffing allocations as of 2028 are indicative. The staff required to implement the proposal (in FTEs):
To be covered by current staff available
in the Commission services
Exceptional additional staff*
EN 22 EN
To be financed under Heading 4
or Research
To be financed from BA line
To be financed from fees
Establishment plan posts
142N/A
External staff (CA, SNEs, INT)
6 3
Considering the overall strained situation in Heading 4, in terms of both staffing and the level of appropriations, the human resources required will be met by staff from the DG who are already assigned to the management of the action and/or have been redeployed within the DG or other Commission services. EuroHPC JU staffing requirements are assessed separately.
Description of tasks to be carried out by the Commission:
Officials and temporary staff Existing responsibilities in relation to quantum technologies are undertaken by 20 FTEs, split across official/temporary-agent and contract-agent roles: ongoing quantum research and innovation activities; established EuroHPC governing/programme coordination; EuroQCI policy and deployment liaison; existing stakeholder, Member State, strategic and inter-service coordination. The additional statutory duties will be addressed through prioritisation and internal reallocation within constant Commission resources. Additional tasks under the Quantum Act include ensuring alignment between the Quantum Europe Framework Initiative and national/regional strategies and monitoring of relevant implementation, preparedness and monitoring for post-quantum cryptography; assessment and designation of quantum strategic projects; strategic quantum infrastructure and oversight of the activities of the implementing body; coordination of quantum grand challenges, including monitoring of milestones and deliverables, Quantum Technology and Innovation Hubs and competence and acceleration centres; Quantum Service Platform for Science and Industry and digital means to communicate information for these activities support governance mechanisms, including the Quantum Strategy Board and the European Quantum Alliance, international cooperation and setting up strategic partnerships with third countries; strategic-dependency monitoring; legal and financial supervision; and support for industrial uptake, standards, and skills, providing technical and legal guidance for procurement of systems integrating innovative quantum solutions and/or post-quantum cryptography solutions. Detailed allocations remain subject to workload validation.
External staff Idem
3.2.4.2. Financed from external assigned revenues Not applicable.
3.2.4.3. Total requirements of human resources Estimate to be expressed in full-time equivalent units (FTEs)
EN 23 EN
VOTED APPROPRIATIONS Year Year Year Year Year Year Year 2028 2029 2030 2031 2032 2033 2034
Establishment plan posts (officials and temporary staff)
Headquarters and Commission representations - line to be confirmed
7 7 7 7 7 7 7
Budget line to be confirmed (EU Delegations) – – – – – – –
(Indirect research) 9 9 9 9 9 9 9
(Direct research) – – – – – – –
Other budget lines (specify) – – – – – – –
External staff (inFTEs)
Contract agents - line to be confirmed 3 3 3 3 3 3 3 Budget line to be confirmed (AC, AL, END and JPD in the
EU Delegations) – – – – – – –
Admin. Support line
Programme support
line
at Headquarters – – – – – – –
in EU Delegations – – – – – – –
(AC, END - Indirect research) 6 6 6 6 6 6 6
(AC, END - Direct research) – – – – – – –
Other budget lines (specify) - Heading 4 – – – – – – –
Other budget lines (specify) - Outside Heading 4 – – – – – – –
TOTAL 25 25 25 25 25 25 25
3.2.5. Overview of estimated impact on digital technology-related investments The EUR 7.600 million policy IT estimate is an indicative provision for quantum-related digital services. Its functional scope, allocation between the European Quantum Service Platform under Article 8 and other relevant digital functions, and the proposed enhancement in 2031 remain subject to technical validation. The estimate will be revised as necessary to reflect the final scope, implementation arrangements and cost assumptions, while maximising reuse of existing EuroHPC and Commission infrastructure and avoiding duplication of expenditure.
TOTAL Digital and IT appropriations Year Year Year Year Year Year Year
TOTAL MFF 2028 – 2034
2028 2029 2030 2031 2032 2033 2034
IT expenditure (corporate) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Subtotal HEADING 4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Outside HEADING 4
Policy IT expenditure on operational programmes 0.800 1.300 0.600 3.100 0.600 0.600 0.600 7.600
Subtotal outside HEADING 4 0.800 1.300 0.600 3.100 0.600 0.600 0.600 7.600
TOTAL 0.800 1.300 0.600 3.100 0.600 0.600 0.600 7.600
EN 24 EN
3.2.6. Compatibility with the current multiannual financial framework The proposal/initiative: – The current 2021–2027 MFF is not affected by the estimates presented here.
Financing from 2028 follows the next MFF and programme decisions; no use of current unallocated margins, special instruments or revision of the current MFF is assumed.
The successor of Horizon Europe and the European Competitiveness Fund are prospective financing sources for Framework Initiative implementation, subject to the next MFF and programme legislation. The implementation-support scenario retains EUR 24.600 million in operational support and EUR 18.067 million in provisional implementing-body delivery support, plus EUR 28.385 million in gross Commission staff costs. The total is EUR 71.052 million over 2028–2034, not the financing envelope for substantive Quantum Act programmes. The EUR 18.067 million delivery-support provision remains subject to validation and must not duplicate Commission staff costs or other programme delivery expenditure.
Estimation sources and reconciliation: The Commission staffing estimates originate with the updated Impact Assessment Annex 4 (Tables 4.13–4.14) and the supporting CBA model v8.0. The detailed staff categories, budgetary costing and annual phasing over 2028–2034 remain subject to validation with the relevant HR and budget services. The illustrative funding tranches for hubs and centres in Section 3.2.2 do not establish limits on the number of facilities supported under the Regulation.
3.2.7. Third-party contributions The proposal/initiative:
– does not provide for co-financing by third parties – provides for the co-financing by third parties estimated below:
Appropriations in EUR million (to three decimal places)
Year 2028
Year 2029
Year 2030
Year 2031
Year 2032
Year 2033
Year 2034 Total
Participating States of the implementing Joint Undertakings (EuroHPC JU, Chips JU) - matching contributions under the JU basic acts.
p.m. p.m. p.m. p.m. p.m. p.m. p.m. p.m.
Private members of the implementing Joint Undertakings
p.m. p.m. p.m. p.m. p.m. p.m. p.m. p.m.
Member States and host entities technology and innovation hubs competence and acceleration centres
p.m. p.m. p.m. p.m. p.m. p.m. p.m. p.m.
EN 25 EN
TOTAL appropriations co- financed
p.m. p.m. p.m. p.m. p.m. p.m. p.m. p.m.
Co-financing may arise under the applicable programme rules, implementing-body basic acts and individual financing decisions. The Quantum Act does not fix an aggregate matching contribution for all measures. EuroHPC and Chips Joint Undertaking contributions must be identified separately by action and instrument. No additional Chips Joint Undertaking resources are assumed without a documented task allocation and costing. 3.3. Estimated impact on revenue – The proposal/initiative has no financial impact on revenue. – The proposal/initiative has the following financial impact: 4. DIGITAL DIMENSIONS
Detailed PQC migration and procurement costs for Union institutions and bodies will be assessed through their cybersecurity and IT planning. Any additional costs attributable specifically to this Regulation should be distinguished from expenditure already required under the existing cybersecurity framework. No separate migration appropriation is established in this Statement.
4.1. Requirements of digital relevance
Reference to requirement Requirement description Actors affected High-level processes Categories
R1 -Article 3 National strategy notifications and Framework Initiative monitoring. Member States notify adoption and changes of national strategies; the Commission monitors alignment and reports annually to the Quantum Strategy Board.
Member States; Commission; Quantum Strategy Board
Notification, validation, alignment review and annual monitoring
Data; digital public service
R2 -Articles 11–13
Strategic project designation and related records. Funding selection and possible designation of non-selected proposals follow draft Article 11–13; record decisions, evidence and any withdrawal. Application volumes and annual compliance reporting in the earlier LFDS are analytical assumptions, not statutory requirements.
Applicants and project operators; Member States; Commission; EuroHPC JU
Selection/designation, decision recording and withdrawal
Data; digital public service
EN 26 EN
R3 -Articles 27–28
Strategic intelligence, capability mapping and critical quantum entities and components. The Commission monitors dependencies in cooperation with Member States and stakeholders, and establishes and updates the list of critical quantum components and entities. The current draft does not establish mandatory reporting duty for undertakings.
Commission; Member States; quantum suppliers and users; research bodies; procurers
Mapping, data validation, dependency analysis, early warning and list updates
Data; digital public service
R4 - Article 27(3)– (4); optional
Optional quantum supply- chain market intelligence platform or digital twin. The Commission may establish it by implementing act after consulting the Board and may integrate it with the Chips supply-chain platform. The current draft does not establish a separate mandatory Quantum market intelligence platform or a fixed 2031 delivery deadline.
Commission; Quantum Strategy Board; suppliers, users and investors; potential platform operator
Conditional establishment, scenario analysis and controlled information exchange
Data; digital solution; digital public service
R5 – Article 21 PQC procurement evidence and verification under applicable procurement requirements. No additional general grant-reporting obligation.
Contracting authorities and relevant suppliers
Procurement compliance checks and evidence management
Data; digital public service
R6 -Article 24– 26
PQC monitoring, preparedness and coordination. The Commission will build on existing cybersecurity cooperation structures for monitoring the transition to post-quantum cryptography, facilitating coordination and supporting procurement implementation. Existing
Commission; Member States; Union institutions; bodies, where covered by the final provisions; relevant cybersecurity structures
Preparedness assessment/reporting, coordination, exercises
Data; digital public service
EN 27 EN
reporting arrangements will be reused wherever possible.
R7 - Article 8 Federated access to quantum computing, simulation, emulation and related software services, using existing EuroHPC and other eligible infrastructures.
Commission, EuroHPC JU, researchers, industry and service providers
Service discovery, access coordination and user support
Digital solution; digital public service
4.2. Data
Type of data Reference to the requirement(s)
Standard and/or specification (if applicable)
National-strategy notifications and Framework monitoring information
R1 National-strategy identifiers and notification metadata; Core Organisation/Location Vocabularies where applicable; DCAT-AP for dataset catalogue descriptions.
Designation records and compliance evidence for Strategic Projects
R2 Stable project and decision identifiers; Core Business/Organisation Vocabulary where applicable; documented evidence schema and retention rules.
Critical quantum components and entities list supporting taxonomy and strategic-dependency indicators
R3 Domain taxonomy and component identifiers to be agreed; NACE and Combined Nomenclature where appropriate; DCAT-AP for catalogue metadata only.
Information for the optional quantum market intelligence platform, if established
R4 Reuse component taxonomy and supplier identifiers; documented JSON/CSV exchange schemas; DCAT- AP for catalogue metadata.
PQC procurement and compliance evidence
R5 Possible reuse of existing procurement, formats; evidence requirements follow the applicable procurement rules and Article 21.
PQC preparedness information R6 Possible aggregate preparedness indicators and reporting templates, to be agreed with the relevant
EN 28 EN
cybersecurity structures within Article 24(2)’s information requirements. The Act does not require transmission of detailed cryptographic inventories.
Alignment with the European Data Strategy Technical formats, semantic assets and data-management practices described in Sections 4.2–4.5 are possible implementation choices. They create no additional legal obligations or reporting duties; applicable legal requirements remain governed by the Act and other relevant legislation. Structured data and metadata will support authorised reuse and avoid parallel collection. Non-confidential datasets may be published in reusable formats. Confidential business information, security-sensitive supply-chain information and personal data will be protected under Article 35 and the applicable data-protection rules. No automatic connection to a common European data space is assumed. Alignment with the once-only principle Implementation will prioritise reuse of Commission programme data and existing national and cybersecurity reporting arrangements, with lawful access and purpose limitation. Additional collection will be limited to information necessary for the final provisions. The IA estimates business administrative burdens at EUR 3.55 million NPV over 2028–2037, equivalent to approximately EUR 0.405 million annually; this is an analytical estimate and must be reconciled with the final legal scope, particularly PQC and the absence of a general undertaking-reporting duty. Where datasets are used, implementation should provide stable identifiers, clear ownership, versioned schemas, metadata, validation rules and documented update schedules. Catalogue metadata may use DCAT-AP where suitable; entity descriptions may reuse relevant Core Vocabularies. Access will be role-based for restricted data. Public outputs will contain only cleared non-confidential information; data quality checks, provenance and correction procedures will support reliable reuse. Data flows
Type of data
Requirement s
Provider Receiver Trigger Frequency
National strategies and changes; Framework progress
R1 Member States; Commissio n for annual report
Commission ; Quantum Strategy Board
Adoption or change of strategy; annual monitoring cycle
On adoption/change; annual Commission progress report
Capability and dependency information
R3 Member States and relevant stakeholder s
Commission and authorised implementin g bodies
Necessary mapping or monitoring under Articles 27-28; existing
As necessary; no blanket annual undertaking duty
EN 29 EN
sources first
Designation records
R2 Applicants; EuroHPC JU; Commissio n
Commission ; applicants; public for cleared decisions
Funding selection; designation request/decisio n; withdrawal
Event-based; additional reporting only where lawfully required
Dependenc y analysis and cleared public outputs
R1, R3, R4 Commissio n
Board; Member States; public for cleared outputs
Validation and confidentiality review
Article 3 annual progress; other outputs as needed
PQC preparednes s information
R6 Member States; relevant Union institutions and bodies, where applicable
Commission ; relevant cybersecurit y structures, subject to applicable rules
Reporting or assessment under Article 24(2)
Subject to the final Article 24(2); reuse existing reporting arrangements
Procuremen t evidence
R5, R6 Bidders and contractors
Contracting authorities and entities
Relevant tender and contract milestones
Per procedure/contra ct
Optional platform information
R4 Participants and authorised data sources
Platform operator; authorised users
Establishment of platform and authorised participation
To be specified if the platform is established
The Article 8 Platform is provided for by the Act; the Article 27 market intelligence platform remains optional. Other entries below describe administrative support through existing tools and workflows, not separate mandatory systems.
4.3. Digital solutions
Digital solution
Reference(s ) to the
requiremen t(s)
Main mandated functionali
ties
Responsib le body
How is accessibil
ity catered
for?
How is reusability considered
?
Use of AI technolog
ies (if applicabl
e)
European Quantum Service Platform for Science
R7
Common access interface for quantum
Commissi on, in cooperatio n with EuroHPC
Accessibl e interfaces in accordanc
Reuse existing EuroHPC access systems and
No mandatory AI functionali
EN 30 EN
and Industry (Article 8)
computing, simulation, emulation and related services
JU and relevant infrastruct ure operators
e with applicable Union requireme nts
Commissio n components
ty
Optional quantum market intelligence platform
R4 Supply- chain scenarios and controlled market intelligence under Article 27(3)– (4), if established. Reuse or integration with the Chips platform will be assessed before a separate build.
The Commissi on (DG CNECT), with operation capable of being entrusted to an implement ing body.
Accessibl e web interfaces and document s; EN 301 549 and WCAG criteria used in design, procurem ent and testing, as applicable ; accessible alternativ es and user support.
The platform builds on existing Union enterprise and innovation portals rather than creating a parallel registry.
No mandatory AI use. Any optional AI functionali ty requires design- stage legal classificati on, data safeguards and human oversight; no automated designatio n or funding decision.
Administra tive support for capability mapping and dependenc y analysis
R3 Capability mapping, component list and dependency analysis under Articles 27–28; authorised collection, quality checks and early warning. No mandatory 45- undertaking
The Commissi on (DG CNECT), supported by implement ing bodies for collection and quality assurance.
Accessibl e web interfaces and document s; EN 301 549 and WCAG criteria used in design, procurem ent and testing, as applicable ; accessible alternativ
Reuse existing programme data, shared entity identifiers, documented schemas and Commissio n components ; modular implementa tion and controlled interfaces.
No mandatory AI use. Any optional AI functionali ty requires design- stage legal classificati on, data safeguards and human oversight; no automated
EN 31 EN
annual return assumed.
es and user support.
designatio n or funding decision.
Strategic- project designation records and workflows
R2 Application intake, assessment workflow, designation records, monitoring under the applicable rules, and withdrawal.
The Commissi on (DG CNECT)
Accessibl e web interfaces and document s; EN 301 549 and WCAG criteria used in design, procurem ent and testing, as applicable ; accessible alternativ es and user support.
Built on existing Commissio n grant and designation workflows rather than as a standalone system.
No mandatory AI use. Any optional AI functionali ty requires design- stage legal classificati on, data safeguards and human oversight; no automated designatio n or funding decision.
Shared policy alignment for the digital solutions listed above - scope and responsibilities to be verified separately for each deployed module.
Applicable policy Alignment
AI Act Any use of AI systems in the context of the digital solutions above will be done in compliance with Regulation (EU) 2024/1689 (AI Act). To that end, it will be assessed whether such AI system is subject to any rules under the AI Act already at the design stage.
Cybersecurity Commission/Union-entity systems follow Regulation (EU, Euratom) 2023/2841 and applicable Commission security rules; national actors follow NIS2 where in scope. PQC readiness and crypto-agility follow the final Act, applicable roadmap and system risk assessment.
EN 32 EN
eIDAS Reuse EU Login and appropriate assurance levels; assess eIDAS and EU Digital Identity Wallet integration where applicable.
Single Digital Gateway and IMI
Assess Regulation (EU) 2018/1724 applicability per procedure. Neither SDG nor IMI integration is presumed; use only where the relevant legal scope and functionality justify it.
Data protection and interoperability
Apply Regulation (EU) 2018/1725 to Commission personal- data processing and GDPR where applicable to other actors. Document minimisation, lawful access, retention and security. Assess Regulation (EU) 2024/903 applicability for each cross- border service and binding requirement.
4.4. Interoperability assessment
Digital public service/category Description Requirements Interoperable
Europe Solutions
Other solutions
Quantum coordination and monitoring service
Proposed common service for national strategy notifications, Framework progress and dependency information. Shared access, identity and data exchange support Commission– Member State cooperation; PQC preparedness uses a segregated interface or existing cybersecurity channels where appropriate. Consolidation is an implementation recommendation,
R1, R3, R6 Core Vocabularies and DCAT- AP where applicable
EU Login; documented interfaces; eDelivery if justified; reuse existing programme/cybersecurity reporting. OOTS only if its legal and technical scope is met.
EN 33 EN
not a new statutory service. Existing Commission tools, such as CIRCABC or Futurium, may also support coordination between the Science Network, hubs, acceleration centres, Board and Alliance.
Federated quantum service access
Service discovery and access coordination for quantum computing, simulation and emulation
R7 Core Vocabularies and DCAT- AP, where applicable
Reuse existing EuroHPC access systems and interfaces
Strategic project and procurement procedures; optional market intelligence service
Reuse grant/designation and procurement systems for cross-border applications and evidence. Assess the optional market intelligence service if established. Business-facing services are not automatically excluded from cross-border interoperability assessment.
R2, R4, R5, R6
Relevant Core Vocabularies; DCAT-AP for published dataset catalogues
Existing funding/tender portals and identity services; documented schemas and APIs. Assess interoperability separately if a distinct service or binding requirement is introduced.
Impact of the requirement(s) as per digital public service on cross-border interoperability Digital public services - legal organisational semantic and technical assessment
EN 34 EN
Assessment level Measures Potential remaining barriers
Legal
Coordination and monitoring: Article 35 govern the relevant information and confidentiality arrangements. Federated access: Article 8 and the applicable infrastructure access and allocation rules apply. Designation: Articles 11–13; PQC procurement: Article 24 and the applicable procurement rules. Any market intelligence platform remains conditional under Article 27(3)–(4). Assess relevant binding cross- border requirements under the Interoperable Europe Act; protect lawful access, purpose limitation and confidentiality
Different eligibility, allocation and procurement rules may constrain cross-border procedures. Sensitive PQC and supply-chain information requires restricted exchange; lawful access remains limited by purpose, confidentiality and applicable data- protection rules.
Organisational
Coordination and monitoring: the Commission works with national contact points and existing cybersecurity structures. Federated access: the Commission, EuroHPC JU and infrastructure operators coordinate discovery, access and user support within their mandates. Designation uses the competent Commission and implementing- body workflows; procurement remains with the relevant contracting authorities. Any optional platform operator and service arrangements would be determined if established. Define access roles and correction and escalation procedures through implementation arrangements.
National capacities, infrastructure allocation calendars, procurement workflows and support levels differ. Responsibilities and service levels depend on the applicable mandates and implementation arrangements; the optional platform’s operator remains undecided.
Semantic
Possible semantic support includes common descriptions and identifiers for national strategies, quantum capabilities and components; resource descriptions and access conditions for federated services; project and decision identifiers for designation; and consistent descriptions of procurement evidence. Any platform data model would depend on its establishment and design. Suitable existing vocabularies and catalogue
National data, resource descriptions, component classifications and procurement- evidence formats differ. Shared mappings may be needed; the Act
EN 35 EN
metadata may be reused; none of these technical choices creates an additional reporting duty.
does not impose a mandatory common vocabulary or a general business reporting return.
Technical
Prioritise existing Commission, cybersecurity, EuroHPC, funding and procurement systems. For federated access, assess compatibility of identity services, interfaces and resource schedulers. For designation and procurement, reuse suitable secure document and evidence workflows. For any optional platform, assess reuse or integration with the Chips supply-chain platform before a separate build. Apply accessibility and risk-based security and test cross-border exchange; particular APIs and schemas remain implementation choices.
Legacy systems, authentication methods, interfaces and resource schedulers differ. Security restrictions and heterogeneous evidence formats may limit automated exchange. The optional platform’s design and integration remain undecided.
4.5. Measures to support digital implementation
Measure Requirements Commission role
Actors
Timeline
Critical-component list and monitoring arrangements
R3 Establish/update the list under Article 28; organise proportionate monitoring under Article 27. Do not presume an implementing act power or compulsory undertaking reporting beyond applicable provisions.
Member States; Board; industry; research bodies
Establishment 2028–2029 assumed; legal deadlines prevail
Taxonomy and data specifications
R1, R3, R4 Agree versioned schemas and access rules; publish cleared reusable specifications.
Member States; DIGIT; JRC; relevant standards bodies
Design 2028– 2029 assumed
EN 36 EN
Strategic project procedures
R2 Define guidance and decision workflow within Articles 11–13; reuse funding- selection records.
EuroHPC JU; Member States; applicants
Before first applicable call/designation
Strategic quantum infrastructure coordination
Articles 8–9 Coordinate implementation, access arrangements and monitoring with relevant implementing bodies
EuroHPC JU, Member States and infrastructure operators
During establishment and operation
National notification and progress-report templates
R1 Provide strategy- notification and annual monitoring arrangements; reuse available funding data.
Member States; national funding bodies; Board
Set-up; annual Commission report under Article 3
Optional market intelligence platform
R4 Consult the Board; assess benefits, reuse and cost; decide on any implementing act under Article 27(3)– (4); commission development only if established.
DIGIT; Chips platform operator; businesses; implementing bodies
Conditional; subject to a separate decision and cost assessment. No standalone platform expenditure is assumed in this LFDS.
PQC preparedness and procurement support
R5, R6 Use existing cybersecurity cooperation structures; monitor PQC preparedness under Article 24(2), facilitate coordination under Article 25 and support procurement implementation under Article 21.
Member States; Union entities; institutions, bodies, offices and agencies; relevant cybersecurity structures; procurers
Preparedness reporting and assessment in accordance with the final Article 24(2); procurement according to Article 21.
Verification, R1–R7 Validate quality Member Ongoing
EN 37 EN
exercises and evaluation
and implementation progress; coordinate relevant scenarios/exercises; evaluate the Act under Article 36.
States; Board; implementing bodies; relevant cybersecurity structures; external evaluators
monitoring; exercises as needed; evaluation five years after entry into force
EN EN
EUROPEAN COMMISSION
Brussels, 25.11.2026 COM(2026) 965 final
ANNEXES 1 to 4
ANNEXES
to the
Proposal for a Regulation of the European Parliament and of the Council
on a framework of measures for strengthening the Union's quantum ecosystem
(Quantum Act)
{SEC(2026) 966 final} - {SWD(2026) 965 final} - {SWD(2026) 966 final} -
{SWD(2026) 967 final}
EN 1 EN
ANNEX I Indicative areas for quantum grand challenges
The following areas identify initial priorities for quantum grand challenges. They address
major scientific, technological and engineering bottlenecks and may be updated in line with
technological progress, strategic needs and market developments. Inclusion in this Annex
does not require all challenges to be launched simultaneously.
Each grand challenge should follow an ambitious, measurable technology roadmap with
milestones and stage gates. Competing approaches may be supported in parallel until evidence
supports selection. Promising results may feed into quantum infrastructures, strategic projects,
innovation procurement, industrial deployment or private investment. The EuroHPC Joint
Undertaking has already initiated a call on grand challenges in quantum computing and
inertial navigation. Further actions under the Quantum Europe Framework Initiative should
build on these efforts.
1. Fault-tolerant quantum computing – making reliable calculations possible
Quantum computers remain vulnerable to noise and errors, limiting the calculations they can
perform reliably. Fault tolerance requires protecting quantum information through error
correction and integrating high-quality processors, controls and software into scalable,
reliable and energy-efficient systems. Qubit counts alone say little about what a machine can
reliably do.
The grand challenge should support competing Union architectures, including logical qubits,
error correction, modular processors and interconnects, control electronics, cryogenic or other
enabling technologies, compilers and software integrated with high-performance computing.
AI-based methods may also support quantum-system calibration, control, error correction and
decoding. Technological neutrality should be preserved, with evidence-based selection of
promising approaches.
By 2030, Union teams should aim to demonstrate sustained error-corrected operation and
credible routes towards useful scientific or industrial workloads. Progress should be judged by
physical and logical error rates, quality and duration of operations, logical qubit number in
relation with logical error rates, scalability, availability, energy use and workload
performance, and according to standardised benchmarks as they become available. Consistent
with the Quantum Europe Strategy, the ambition is to reach approximately 100 error-
corrected logical qubits per system by 2030 or soon after, scaling towards thousands per
platform by 2035.
2. Quantum navigation and timing – when satellite signals fail
Union transport, energy networks and critical services depend on positioning, navigation and
timing, yet satellite signals can be obstructed, degraded, jammed or spoofed. Quantum
gyroscopes, accelerometers, atomic interferometers and advanced clocks could complement
conventional navigation when satellite positioning is unavailable.
The grand challenge will aim to develop deployable, integrated Union quantum systems for
aircraft, ships, autonomous systems, underground and underwater operations, emergency
services and space. Work should cover sensor performance alongside miniaturization, weight,
power, calibration, robustness, manufacturability, cost and integration with classical
navigation. This development shall take into account the dual-use dimension of Inertial
Navigation Systems and adopt necessary safeguards accordingly.
The next step is to test systems in representative GNSS-denied or degraded environments by
2030 and benchmark their performance against leading conventional solutions for navigation
EN 2 EN
accuracy, stability, duration, reliability and practical deployability. The longer-term aim is to
reduce dependence on any single source of positioning and timing.
3. Quantum memories and repeaters – connecting quantum devices
Future quantum computers, networks and distributed sensors will need to exchange quantum
states and entanglement, moving beyond isolated devices. This demands high-fidelity, long-
lived and multiplexed quantum memories, repeaters and interfaces between different
technological platforms.
The grand challenges should advance storage and retrieval, frequency conversion, matter–
photon interfaces, entanglement generation and distribution, photonic or other interconnects,
and interoperability across quantum computing and communication systems. Additional areas
of work include network control, routing, resource allocation, synchronization, link
monitoring and verification.
By 2030, trials should demonstrate interoperable quantum memories, repeaters and interfaces
in multi-node systems, with progressively longer entanglement links and connections between
different devices. Towards 2035, these technologies should support more reliable inter-
metropolitan quantum networks, modular quantum computing and the progressive
development of the Quantum Internet at Union level, with performance assessed through
fidelity, storage time, transmission distance and interoperability.
4. Quantum sensing and imaging -detecting faint signals
Quantum sensors can measure minute changes in magnetic fields, gravity, acceleration and
time, opening opportunities in medical diagnostics, navigation, climate monitoring, civil
engineering and resource mapping.
The grand challenge should turn laboratory sensitivity into compact, reliable and affordable
instruments that work outside the laboratory. Such instruments should bring measurable
advantages in biomagnetic and medical imaging, gravimetry, magnetometry, inertial sensing,
optical and photonic imaging, microscopy and spectroscopy while also addressing tough
engineering, packaging, miniaturization, and signal processing and calibration issues.
By 2031–2032, the aim should be to demonstrate industrially relevant systems ready for
further testing, validation and, where appropriate, deployment in hospitals, industrial
facilities, transport environments or the field. Their performance should be compared with
conventional technologies for sensitivity, resolution, robustness, usability and cost. Medical
uses should follow applicable clinical, medical-device, safety and data-protection
requirements.
5. Quantum machine learning – demonstrating potential advantages
Grand challenges should investigate whether quantum computing can provide measurable
advantages for selected artificial intelligence and machine-learning tasks, including training,
inference, generative modelling and optimisation. Activities should explore hybrid quantum-
classical learning, quantum data pre-processing and selected quantum learning models,
including supervised, unsupervised and reinforcement learning, while addressing data
encoding and loading, trainability, noise, scalability, resource requirements and integration
with Union HPC and AI capabilities.
Priority should be given to well-defined use cases and independently reproducible, end-to-end
benchmarks against leading classical AI methods, assessing accuracy, execution time,
training-data requirements, energy consumption and total classical and quantum resources.
Milestones should distinguish near-term hybrid demonstrations from longer-term fault-
tolerant approaches and establish whether quantum methods deliver practical advantages.
EN 3 EN
6. Quantum for discovering advanced materials or medicines
Understanding molecules, advanced materials and complex physical and biological processes
is essential for medicines, batteries, catalysts, chemicals, energy technologies and
manufacturing. Conventional simulation can become prohibitively difficult, while quantum
computing and simulation may offer new tools where they address a concrete scientific or
industrial need.
Grand challenges should pair quantum developers with leading Union scientists and industrial
users to tackle defined problems in discovering new pharmaceuticals, new stable advanced
materials and safer chemicals, while further improving and optimizing chemical processes
and sustainable manufacturing. Quantum methods should be combined with HPC, AI and
experiments when appropriate. Where appropriate, such grand challenges will be set in
coordination with the grand challenges under Council Recommendation XX on advanced
materials [please insert correct reference to COM(2026) 833 final once adopted] ensuring
coordination and complementarity with priority challenges in the area of advanced materials.
By 2031/32, selected grand challenges should demonstrate quantum-enabled workflows
addressing important scientific or industrial problems, with rigorous benchmarking against
leading conventional approaches. Progress should be measured through computational
accuracy, performance, resource requirements and the potential for practical advantage.
Promising applications should progress towards industrial validation and adoption as the
underlying technologies mature.
7. Full-stack quantum systems – more than a processor
A quantum processor is not yet a usable quantum system. Competitive products depend on the
complete stack, from processors, control and cryogenics to interconnects, error correction,
operating systems, compilers, middleware, applications and user access. Weakness in any
layer can undermine otherwise excellent Union technology.
Grand challenges should support the co-design of Union hardware and software into modular,
interoperable and scalable systems, with portable interfaces and integration into HPC, AI and
cloud environments. Work may include automated operation, workload management, energy
efficiency and architectures that allow components to be upgraded without rebuilding the
system. Where appropriate, activities may also support the development of interoperable
open-source components and a Union open-source quantum software stack, alongside other
software solutions.
Demonstrators towards 2030 should show hardware, control, error correction, software and
applications working together through documented interfaces, with movement between
simulation, emulation and physical resources where feasible. Results should support Union
products and services that can be deployed and scaled.
EN 4 EN
ANNEX II Priority areas for post-quantum cryptography
Post-quantum cryptography is essential to protect the Union's digital infrastructure,
communications and sensitive information against quantum-enabled attacks. Priority actions
should strengthen Union capabilities in cryptanalysis and the development of secure
cryptographic solutions, including digital signatures, key establishment, threshold
cryptography, privacy-preserving schemes and low-complexity cryptographic methods.
Research should assess the security of existing approaches against classical and quantum
attacks, explore new cryptographic methods and improve their efficiency, with particular
attention to long-term security and Union technological capabilities.
Turning research into trusted solutions will be equally important. Actions should support the
development and industrialisation of secure, efficient and verifiable cryptographic
implementations. Particular attention should be given to formal verification and high-
assurance cryptographic implementations, cryptographic agility, migration tools, trusted
hardware supporting fundamental cryptographic functions and technologies enabling secure
computation on encrypted data. Cooperation between researchers, industry and certification
stakeholders should facilitate the deployment of reliable Union solutions and their integration
into existing digital systems.
The Union should also strengthen its capacity to independently test and validate post-quantum
cryptographic technologies. Shared testing facilities and capabilities should support the
assessment of software and hardware security, including side-channel analysis, fault-injection
testing and hardware vulnerability assessments, with the aim of making trusted hardware
foundations more transparent, verifiable and reusable. These activities should contribute to
common testing methodologies, industrial-grade security tools and certification processes
where applicable. By 2030, the aim should be to strengthen Union research in cryptography
and the role of the Union in driving agreements on new schemes at international level,
ensuring secure physical implementations, hardware development capabilities, efficient
implementations reaching the computing edge, and stronger capabilities in high-assurance
tools and practical testing services supporting a secure, coordinated and risk-based transition
to post-quantum cryptography.
EN 5 EN
ANNEX III Priority areas for quantum infrastructures
Under the Quantum Europe Framework Initiative, quantum infrastructures should give
researchers, firms and public users shared Union capacity for testing, validation, integration,
demonstration and deployment. They should build on existing Union and national
investments, avoid duplication and enable cross-border access on transparent and appropriate
conditions. Where relevant, these infrastructures should also support independent
benchmarking and verification, using common performance metrics and reproducible testing
procedures. The following are initial priority areas.
1. European Quantum Service Platform for Science and Industry
The European Quantum Service Platform should provide researchers, companies and public
users with federated access to quantum computing, simulation, emulation and related software
services. It should build on existing EuroHPC and national infrastructures, without
duplicating their facilities or altering applicable access conditions.
Quantum simulation is the use of a controllable quantum system to mimic the properties or
behaviours of another quantum system. Quantum emulation is the use of a classical
computing system to simulate the properties or behaviours of a specific quantum target
system.
2. EuroQCI – secure communications across Europe
Governments, critical infrastructures and strategic industries need resilient and highly secure
communications. The European Quantum Communication Infrastructure (EuroQCI) combines
terrestrial and space-based capabilities to support trusted cross-border services and strengthen
Union cybersecurity and connectivity. EuroQCI was launched in 2021, with first Member
States’ deployments started as of 2023. Since then, Member States have advanced the
deployment of national terrestrial quantum communication networks, including cross-border
preparations and real-world quantum key distribution (QKD) pilots. Activities also include
secure communications demonstrations for public authorities and critical infrastructure,
development of Union components and testing facilities, and preparations for satellite-based
QKD.
EuroQCI should progressively link national quantum networks with Union space capabilities
and gradually provide quantum key distribution (QKD) as a service, complemented where
appropriate by post-quantum cryptography (PQC) and conventional end-to-end security
measures. It should support public authorities, interoperability, testing, certification and
integration with existing networks, while allowing sector-specific commercial services to
emerge.
By 2031, the ambition is to establish the first interconnected experimental Union terrestrial
and space-based quantum communication network, linking national infrastructures and
capable of delivering experimental QKD services across the Union. During 2031–2035,
EuroQCI should progressively move towards certified, reliable and interoperable operational
services, including integration of relevant governmental capabilities into IRIS²1 as they
mature. Commercial applications should also be supported through eligible Strategic Projects
(see Annex IV), building on European quantum communication technologies and services.
3. Building the Quantum Internet
Quantum Internet means a network of interconnected quantum devices, including quantum
computers, sensors and quantum memories, that enables the transmission of quantum
1IRIS² | EU Space Policy
EN 6 EN
information and the distribution of entanglement between distant nodes through quantum
communication links. Supported by classical communication and control systems, such
networks may enable distributed quantum computing, networked quantum sensing and
advanced quantum communication applications.
A future Quantum Internet could link quantum computers, sensors and other devices through
the distribution of quantum states and entanglement, potentially enabling distributed
computing, coordinated sensing and new secure communication functions. Such networks
will depend on quantum memories, repeaters, entanglement distribution, quantum-compatible
interfaces and dedicated network-control software. Experimental metropolitan networks will
test the reliable distribution of entanglement between different quantum devices, maintaining
the necessary quantum coherence and interoperability.
Union research has already demonstrated entanglement between independently operated
quantum-network nodes connected by approximately 10 km of optical fibre. Progress has also
been made on quantum repeater components and networking software. These remain
experimental results rather than an operational Quantum Internet.
The next target is to demonstrate, by 2030, the first interoperable metropolitan quantum
networks, with first-generation pilot facilities operating over distances of up to approximately
50 km, subject to technological readiness.
Towards 2035, Europe should aim to extend these capabilities to inter-metropolitan networks,
targeting connections of around 200 km, and demonstrate applications beyond quantum key
distribution, including distributed quantum computing and networked sensing.
The longer-term ambition (2040+) is a federated Union Quantum Internet, progressively
developed as reliability, interoperability and industrial readiness improve.
4. Union quantum gravimetry – perceiving what lies well below
Quantum gravimeters can detect small variations in gravity that may help characterise
subsurface features at depths of up to several tens of kilometres, depending on geological and
measurement conditions. One important application is monitoring groundwater resources and
aquifer depletion, helping Europe respond to climate change, environmental and
infrastructural challenges, such as droughts and increasing pressure on water supplies.
Other potential applications include detecting geological structures, monitoring volcanic
activity and magma chambers, mineral exploration, archaeology and critical infrastructure.
Potential dual-use applications, including in defence and security, could include detecting
underground structures and future maritime sensing capabilities, although these would require
extensive testing and validation.
Union research has already developed quantum-gravimeter prototypes tested outside
laboratories. The next step is to establish a distributed network of ground-based and mobile
instruments across Europe, with interoperable measurements and validated services towards
2030. A space-based gravimetry pathfinder could complement these capabilities beyond 2030.
5. Union quantum medical imaging – towards clinical validation
Union research has already demonstrated the principles of quantum-enhanced medical
imaging and highly sensitive magnetic measurements. These technologies could help doctors
detect diseases earlier, including certain cardiovascular, cancers and neurological conditions,
and enable more precise and personalised diagnostics.
Further research, engineering and clinical validation are needed before routine medical use.
As a first step, a Union Q-MRI pilot infrastructure should be supported to help hospitals,
EN 7 EN
research centres and industry validate these technologies, with the longer-term objective of
bringing reliable quantum-imaging devices into everyday clinical practice.
The infrastructure should build on quantum-enhanced and metabolic MRI and accommodate
other mature applications, including biomagnetic sensing, neurological and cardiovascular
measurements, microscopy and AI-assisted analysis. It should connect accredited hospitals,
clinical researchers, industry, and patients drawing on relevant Union Q-MRI research and
pilot activities where appropriate.
By 2030–2031, the subsequent aim would be to move selected systems from prototypes to
multi-site clinical validation and, where feasible, deployment, and placing on the market, in
compliance with relevant Union law regulating medical devices and data protection. Priority
should go to technologies with clear potential benefit for patients and clinically meaningful
evidence.
6. Union quantum clocks – securing Union's time
The Union's economy depends on precise and reliable time measurement. Electricity grids,
telecommunications, financial transactions, navigation and space systems all rely on accurate
synchronisation. Disruptions to satellite-based timing could affect several critical services
simultaneously. Quantum clocks offer the prospect of more accurate, resilient and Union-
controlled timing capabilities, strengthening technological sovereignty and security.
The Union already has strong scientific capabilities in atomic and optical clocks, but these
remain largely concentrated in specialised laboratories. A Union quantum timing
infrastructure should connect leading metrology facilities, distribute precise time and
frequency signals across borders, and develop compact, transportable clocks for practical
applications. It should also contribute to the development of future Galileo capabilities and
resilient alternatives when satellite timing is unavailable.
By 2030, Europe should aim to demonstrate a cross-border quantum timing network,
providing highly accurate and traceable time signals and testing applications with
telecommunications, energy, financial and space users. Beyond 2030, the objective should be
to deploy robust Union quantum clocks in critical infrastructures, creating new industrial
opportunities and reducing strategic dependencies.
EN 8 EN
ANNEX IV Priority areas for strategic projects
Strategic projects should address identifiable Union capacity gaps through industrialization,
scale-up and deployment, or through services that bring clear Union added value. They should
complement, not duplicate, grand challenges and quantum infrastructures. Designation itself
does not grant an entitlement to funding. Priority areas may overlap and projects may cover
several of priority areas.
Projects should follow measurable milestones reflecting their technological maturity and
industrial readiness, with priority given to those offering credible pathways towards Union
production, deployment, commercial uptake and reduced strategic dependencies. Indicative
timelines should remain sufficiently flexible to accommodate technological developments and
market needs. Strategic projects could cover priority areas such as:
(1) Building fully operational Union quantum computers – bringing reliable
systems to users
The Union needs the ability to design, build and operate quantum computers that can serve
users beyond the laboratory. Strategic projects should help Union providers move from
experimental processors to fully deployable systems and commercially useful computing
services, including through quantum providers and cloud service operators.
Strategic projects may cover industrial-scale processors and simulators, modular or distributed
systems, data-centre installation, control and orchestration, hybrid quantum–HPC or
quantum–AI systems and cloud-accessible quantum services, including those offered by
providers established in the Union.
Priority towards 2030 should go to systems with credible industrial production, operation,
maintenance and end-user pathways, strengthening Union suppliers and allowing researchers,
businesses and administrations to access competitive quantum services.
(2) Industrial quantum applications – bringing quantum capabilities to users
Strategic projects could support large industrial applications built on Union quantum
hardware and software capabilities, transforming technological advances into solutions
addressing concrete industrial and public-sector needs.
For example, strategic projects could develop and deploy applications in pharmaceuticals,
safer chemicals, materials, energy, manufacturing, transport, finance, telecommunications,
water infrastructure and critical infrastructure, combining quantum technologies with HPC
and AI where appropriate.
Strategic projects could also support the development, industrialisation, integration, validation
and deployment of quantum technologies that strengthens the security, resilience and
technological autonomy of the Union in strategically exposed border and maritime regions.
Priority should be given to applications demonstrating measurable advantages, credible users,
sustainable business models and clear pathways towards industrial validation, procurement
and commercial uptake.
(3) Quantum manufacturing – taking European Union designs into production
Research excellence will not create industrial leadership unless quantum components and
systems can be manufactured repeatedly, reliably and at scale. Quantum production involves
specialised photonic, superconducting, cryogenic, atomic and other processes not always
covered by conventional semiconductor facilities.
EN 9 EN
Strategic projects can support quantum design centres, quantum foundries, specialised pilot-
to-industrial production sites, dedicated equipment and tools for quantum chip manufacturing,
as well as chip fabrication, integration, packaging, characterization, qualification and
manufacturing methods that improve yield, reproducibility and cost. They should complement
quantum-chip pilot lines and activities within the Chips JU mandate, avoiding double
financing.
Towards 2030, projects should strengthen Union quantum pilot production and design
capabilities, demonstrating repeatable manufacturing processes, component qualification and
improved production yields. During 2030–2035, priority should shift towards industrial-scale
production, commercially viable quantum foundries and reliable Union supply chains,
building on successful pilot lines and demonstrated market demand.
(4) Critical quantum components – reducing supply vulnerabilities
A single specialised component can determine whether an entire quantum system can be built
and maintained in Europe. Limited availability of lasers, photonic sources and detectors,
cryogenics, control electronics, materials or precision equipment can create strategic
dependence.
Strategic projects could support the industrialisation and commercialisation of these
technologies, including quantum key distribution equipment, entanglement sources, quantum
memories, repeaters, network nodes and interfaces, microwave and radio-frequency systems,
vacuum equipment, substrates, packaging, connectors and testing instruments. Priority should
go to components with few suppliers, strategic supply risks or major scale-up barriers and to
technologies useful across several quantum domains.
By 2032–2033, projects should work towards commercially viable Union production, better
supplier diversity and secure availability of critical inputs for computing, communication,
sensing and metrology.
(5) Quantum sensing and metrology – precision ready for industry
Quantum sensing is among the fields closest to market uptake, with applications in healthcare,
navigation, climate, industrial inspection and infrastructure monitoring. The challenge is to
convert promising prototypes into qualified systems and repeatable services.
Strategic projects could support the miniaturisation and scaling-up of production of quantum
gravimeters, accelerometers, gyroscopes, clocks, magnetometers, imaging and biomagnetic
systems, spectroscopy and environmental or space sensors. They may include production,
integration, testing, qualification and operational deployment, including sensors used in
advanced manufacturing.
Towards 2030, priority should go to field validation and industrial qualification of quantum
sensing technologies that demonstrate measurable advantages over conventional solutions. By
2035, selected technologies should progress towards commercially available products and
operational services, with the aim of reaching technology readiness levels 7–9 where
appropriate. Size, weight, power consumption, calibration, reliability and cost should remain
central to industrial readiness assessments.
(6) Quantum technologies for health – evidence before deployment
Quantum technologies may improve diagnosis, medical research and discovery of medicines,
but clinical value must be demonstrated before deployment. Europe should help promising
healthcare technologies progress beyond research prototypes.
EN 10 EN
Strategic projects may support the development and industrialisation of quantum-enhanced
MRI and other imaging, biomagnetic measurements, specialised medical detectors, AI-
assisted clinical analysis and quantum simulation for molecular and pharmaceutical research.
They may industrialise systems emerging from Union clinical validation facilities.
Towards 2030–2031, priority should go to technologies progressing towards clinical
validation, regulatory approval, industrial manufacture or commercial services, with clear
benefits for clinicians or patients and full respect for clinical, safety and data-protection
requirements.
(7) Quantum communication and networking – from secure links to the Quantum
Internet
The Union needs a competitive industry capable of developing secure quantum
communication products and technologies for future quantum networks. Strategic projects
could support the industrialisation and commercial deployment of quantum key distribution
systems, terrestrial and space-based equipment, quantum repeaters, entanglement sources,
network nodes and interfaces between quantum devices.
Projects may also support system integration, networking software, interoperability, testing,
certification and the provision of services. They should complement, rather than duplicate,
EuroQCI and Union Quantum Internet infrastructures.
Towards 2030 and beyond, priority should go to commercially viable Union quantum
communication products and services. During 2030–2035, projects could support
interoperable technologies for larger quantum networks and emerging applications in
distributed quantum computing and sensing.
EN EN
EUROPEAN COMMISSION
Brussels, 25.11.2026 SWD(2026) 967 final
COMMISSION STAFF WORKING DOCUMENT
Subsidiarity Grid
Accompanying the document
Proposal for a Regulation of the European Parliament and of the Council
on a framework of measures for strengthening the Union's quantum ecosystem
(Quantum Act)
{COM(2026) 965 final} - {SEC(2026) 966 final} - {SWD(2026) 965 final} -
{SWD(2026) 966 final}
1
Subsidiarity Grid
1. Can the Union act? What is the legal basis and competence of the Unions’ intended action?
1.1 Which article(s) of the Treaty are used to support the legislative proposal or policy initiative?
Article 173(3) TFEU is the main legal basis. It allows the Union to support Member State action to strengthen industrial competitiveness, including by improving access to quantum facilities and helping firms bring research results to market. Article 114 TFEU provides the basis for targeted internal market measures on quantum procurement and post-quantum cryptography, where divergent national approaches could create barriers.
1.2 Is the Union competence represented by this Treaty article exclusive, shared or supporting in nature?
The Union has supporting competence for industry under Article 6(b) TFEU and shared competence for the internal market under Article 4(2)(a) TFEU. Article 173(3) TFEU excludes harmonisation of national laws under the industrial policy basis. Subsidiarity applies to both parts of the proposal.
Subsidiarity does not apply for policy areas where the Union has exclusive competence as defined in Article 3 TFEU1. It is the specific legal basis which determines whether the proposal falls under the subsidiarity control mechanism. Article 4 TFEU2 sets out the areas where competence is shared between the Union and the Member States. Article 6 TFEU3 sets out the areas for which the Unions has competence only to support the actions of the Member States.
2. Subsidiarity Principle: Why should the EU act?
2.1 Does the proposal fulfil the procedural requirements of Protocol No. 24:
Has there been a wide consultation before proposing the act? Yes. The open call for evidence received 228 contributions, comprising 216 portal submissions and 12 additional papers. The Commission also conducted 32 targeted interviews, received 41 industry survey responses from 13 Member States and held exchanges with national authorities and scientific and industry bodies.
Is there a detailed statement with qualitative and, where possible, quantitative indicators allowing an appraisal of whether the action can best be achieved at Union level? Yes. Section 2 of the explanatory memorandum and Chapter 3 of the impact assessment explain the need for Union action and its added value, as summarised in point 2.2. Chapter 2 provides evidence on national investment, infrastructure gaps and supply dependencies. Chapter 6 estimates the costs and savings of the policy options.
2.2 Does the explanatory memorandum (and any impact assessment) accompanying the Commission’s proposal contain an adequate justification regarding the conformity with the principle of subsidiarity?
Yes. National measures can support research and firms within each Member State. Achieving critical mass across research, fabrication and testing requires access to facilities across borders.
1 https://eur-lex.europa.eu/legal-content/EN/TXT/HTML/?uri=CELEX:12008E003&from=EN 2 https://eur-lex.europa.eu/legal-content/EN/TXT/HTML/?uri=CELEX:12008E004&from=EN 3 https://eur-lex.europa.eu/LexUriServ/LexUriServ.do?uri=CELEX:12008E006:EN:HTML 4 https://eur-lex.europa.eu/legal-content/EN/TXT/HTML/?uri=CELEX:12016E/PRO/02&from=EN
2
Coordinating procurement gives suppliers access to a larger early market, while pooling supply-chain information reveals dependencies that individual Member States cannot identify alone.
2.3 Based on the answers to the questions below, can the objectives of the proposed action be achieved sufficiently by the Member States acting alone (necessity for EU action)?
No. Member States can finance facilities, support firms and purchase quantum technologies. Acting alone, they cannot secure access to facilities elsewhere in the Union, bring together demand from buyers in several countries or assess dependencies across the European supply chain.
(a) Are there significant/appreciable transnational/cross-border aspects to the problems being tackled? Have these been quantified?
Yes. Specialised facilities, suppliers and buyers are distributed across borders. The impact assessment quantifies selected dependencies. For example, it identified no EU-based supplier for 9 of 47 inputs examined. It gives no aggregate estimate of cross-border effects.
(b) Would national action or the absence of the EU level action conflict with core objectives of the Treaty5 or significantly damage the interests of other Member States?
Divergent national procurement or post-quantum cryptography requirements could make it harder for suppliers to serve several Member States, impairing the functioning of the internal market. The assessment identifies this risk without establishing significant damage to a particular Member State.
(c) To what extent do Member States have the ability or possibility to enact appropriate measures?
Member States can adopt quantum strategies, fund research and infrastructure, develop skills and act as first buyers. By July 2026, 14 Member States had adopted a quantum-specific strategy and four were preparing one. However, few are able to invest significant amounts to reach a breakthrough.
(d) How does the problem and its causes (e.g. negative externalities, spill-over effects) vary across the national, regional and local levels of the EU?
Research facilities, specialist staff and industrial partners are concentrated in established clusters. Firms and research teams in regions with fewer facilities depend more heavily on access to pilot lines and testbeds elsewhere to validate their technologies. Access to quantum capabilities remains uneven throughout the Union.
(e) Is the problem widespread across the EU or limited to a few Member States?
It is widespread, although its intensity varies. Fragmented demand and dependence on external suppliers affect the Union market as a whole. Limited access to specialised facilities is more acute in Member States with smaller quantum sectors. Similarly, not all Member States have a sufficient budget to fund quantum research and deployment initiatives.
(f) Are Member States overstretched in achieving the objectives of the planned measure?
The evidence does not establish that Member States are generally overstretched. They accounted for approximately EUR 9 billion of the more than EUR 11 billion invested or committed by the Union
5 https://europa.eu/european-union/about-eu/eu-in-brief_en
3
and its Member States over five years. The practical constraint is that the cost of a specialised facility may exceed what demand in one country can sustain.
(g) How do the views/preferred courses of action of national, regional and local authorities differ across the EU?
Consultation feedback highlighted the need for better coordination and greater use of existing facilities. The available evidence does not establish systematic differences in preferences between Member States or between national, regional and local authorities.
2.4 Based on the answer to the questions below, can the objectives of the proposed action be better achieved at Union level by reason of scale or effects of that action (EU added value)?
Yes. A pilot line in one Member State can serve firms in several others. Public buyers can bring demand together, and authorities can pool information to identify suppliers on which several Member States depend. Research-wise, joining efforts between leading centres can build the sufficient critical mass to achieve a breakthrough and avoid duplications and overlaps of very costly research. Lastly, better monitoring of supply chain risks at the EU-level can streamline a coordinated international cooperation for quantum and mitigate dependencies.
(a) Are there clear benefits from EU level action?
Yes. Firms gain access to facilities and potential first buyers beyond their home market. Authorities gain a more complete picture of critical dependencies and possible alternative suppliers. Research centres join efforts to solve critical scientific and technological bottlenecks and avoid duplication.
(b) Are there economies of scale? Can the objectives be met more efficiently at EU level (larger benefits per unit cost)? Will the functioning of the internal market be improved?
Yes. Shared pilot lines and testbeds spread fixed costs across more users and reduce the need for duplicate investment. Coordinated procurement can combine orders that would individually be too small to support early deployment and make it easier for suppliers to reach buyers across the Union. Quantum is highly capital-intensive, yet this needs to be patient capital. The private pool of capital in the EU is shallower than its competitors, making it crucial to pool resources around common projects and firms to eventually scale up and deploy quantum solutions.
(c) What are the benefits in replacing different national policies and rules with a more homogenous policy approach?
Common conditions for EU designation and access make it easier for firms and research teams to participate in projects and use facilities across borders. National programmes can continue to reflect each Member State’s scientific and industrial strengths.
(d) Do the benefits of EU-level action outweigh the loss of competence of the Member States and the local and regional authorities (beyond the costs and benefits of acting at national, regional and local levels)?
Yes. The benefits of shared facilities and cross-border procurement justify common conditions for those activities. National and regional authorities retain discretion over their investment priorities, and contracting authorities remain responsible for individual procurement decisions under the applicable rules.
(e) Will there be improved legal clarity for those having to implement the legislation?
4
Yes. Common designation criteria and access conditions clarify which requirements apply to project applicants, facility operators and implementing authorities across the Union.
3. Proportionality: How the EU should act
3.1 Does the explanatory memorandum (and any impact assessment) accompanying the Commission’s proposal contain an adequate justification regarding the proportionality of the proposal and a statement allowing appraisal of the compliance of the proposal with the principle of proportionality?
Yes. Section 2 of the explanatory memorandum and Sections 7.6 and 8 of the impact assessment explain why voluntary coordination is insufficient and why more extensive obligations would impose additional costs. Private participation is generally voluntary. The proposal targets obligations at public authorities, actors seeking designation or support, and defined cases where supply-chain information is necessary. Existing facilities and information are to be reused wherever possible.
3.2 Based on the answers to the questions below and information available from any impact assessment, the explanatory memorandum or other sources, is the proposed action an appropriate way to achieve the intended objectives?
Yes. A regulation provides common conditions for cross-border activities while relying primarily on existing authorities, facilities and programmes. It preserves national budgetary choices and limits administrative obligations to the actors and activities concerned.
(a) Is the initiative limited to those aspects that Member States cannot achieve satisfactorily on their own, and where the Union can do better?
Yes. It concentrates on cross-border infrastructure access, coordination of early demand and Union- wide supply dependencies. Member States retain responsibility for their national quantum strategies and programmes.
(b) Is the form of Union action (choice of instrument) justified, as simple as possible, and coherent with the satisfactory achievement of, and ensuring compliance with the objectives pursued (e.g. choice between regulation, (framework) directive, recommendation, or alternative regulatory methods such as co-legislation, etc.)?
Yes. A regulation allows authorities to apply the same designation criteria, access conditions and governance procedures directly. A directive would require separate national transposition, while a recommendation would leave the continuity of cross-border arrangements uncertain.
(c) Does the Union action leave as much scope for national decision as possible while achieving satisfactorily the objectives set? (e.g. is it possible to limit the European action to minimum standards or use a less stringent policy instrument og approach?)
Yes. Member States retain discretion over national budgets, programmes and investments. Contracting authorities continue to make procurement decisions within the applicable rules. Common procedures are limited to matters requiring consistent cross-border implementation.
(d) Does the initiative create financial or administrative cost for the Union, national governments, regional or local authorities, economic operators or citizens? Are these costs commensurate with the objective to be achieved?
Yes. The impact assessment estimates EUR 105.92 million in total societal costs and EUR 13.59 million in monetised savings over 2028–2037, in present-value terms. Most costs fall on public
5
authorities and implementing bodies. The estimated administrative burden on businesses is EUR 3.55 million over the period. Citizens face no direct obligations. The assessment considers the costs commensurate in view of the expected gains in infrastructure access, industrial capacity and supply- chain resilience, most of which could not be monetised.
(e) While respecting the Union law, have special circumstances applying in individual Member States been taken into account?
Yes. Firms in Member States without specialised facilities can benefit from access to facilities elsewhere in the Union. Existing capacity is to be used first, with upgrades or new facilities supported where mapping demonstrates a gap or unmet demand. This accommodates differences in national and regional infrastructure and industrial capacity.
EUROPEAN COMMISSION
Brussels, 25.9.206
SEC(2026) 966 final
REGULATORY SCRUTINY BOARD OPINION
Proposal for a Regulation of the European Parliament and of the Council on a
framework of measures for strengthening the Union’s quantum ecosystem
(Quantum Act)
{COM(2026) 965 final}
{SWD(2026) 965 final}
{SWD(2026) 966 final}
{SWD(2026) 967 final}
Commission européenne, B-1049 Bruxelles / Europese Commissie, B-1049 Brussel - Belgium [email protected]
EUROPEAN COMMISSION REGULATORY SCRUTINY BOARD Chair
Brussels, 25 September 2026 RSB/LR/cdd – rsb(2026)9611810
NOTE FOR THE ATTENTION OF MR ROBERTO VIOLA, DIRECTOR-GENERAL OF DG CNECT
Subject: Submission of the Staff Working Document on the Quantum Act Impact Assessment
Please find in annex the positive opinion with reservations of the Regulatory Scrutiny Board on the draft impact assessment report on the above-mentioned subject. The report should be adjusted in accordance with the recommendations of the Board prior to launching the interservice consultation.
Please note that the impact assessment report and the Board's opinion should be added to the corresponding initiative as it goes into the inter-service consultation (ISC) and as it is presented to the College. Detailed instructions on which documents need to be uploaded in Decide when launching the ISC are available on GoPro.
Once the College has adopted the corresponding initiative, the Board’s opinion will be published centrally by Secretariat-General on the Register of Commission Documents together with the related impact assessment report.
Leopoldo Rubinacci
Encl. Opinion of the Regulatory Scrutiny Board
c.c.: B. Seibert, J. Petkova (President's Cabinet) A. Timonen (Cabinet of Executive Vice-President Virkunnen) M. Hager, D. Denning (Cabinet of Commissioner Dombrovskis)
J. Jakubová, W. Wijsmuller, T. Skordas, M. Figwer, K. Gross, L. Jugel, F. Bismarck, O. Diez, L. Olislager, A. Gamito Guijarro, K. Pyrgaki, P. Kleij, P. Ganoti, M. Vieira Cortada (CNECT)
I. Juhansone, P. Leardini, N. Behrndt, E. Roller, M. Wimmer, I. Gligor, A. Cipollone, I. C. Condurat, M. Weiler (SG) D. Givord-Strassel, M. Havrda, R. Höijer, A. Vannini, A. Gemberg-Wiesike, E. Maincent, R. Schindler (RSB)
ve_cnect.c.2 (CNECT) ve_cnect.c (CNECT)
Electronically signed
Electronically signed on 25/09/2026 15:54 (UTC+02) in accordance with Article 11 of Commission Decision (EU) 2021/2121
________________________________
This opinion concerns a draft impact assessment which may differ from the final version.
Commission européenne/Europese Commissie, 1049 Bruxelles/Brussel, BELGIQUE/BELGIË - Tel. +32 22991111 [email protected]
EUROPEAN COMMISSION REGULATORY SCRUTINY BOARD
Brussels, RSB
Opinion
Title: Impact assessment / Quantum Act
Overall opinion: POSITIVE WITH RESERVATIONS
(A) Policy context The Quantum Act aims to sustain the Union's scientific and technological leadership, strengthen its competitiveness and industrial deployment capacity in quantum technologies, and improve EU resilience, trusted and quantum-safe deployment and economic security.
(B) Key issues The Board notes the additional information provided and commitments to make changes to the report. However, the report still contains significant shortcomings. The Board gives a positive opinion with reservations because it expects the lead Service to rectify the following aspects: (1) The problem and their drivers are not sufficiently assessed. (2) The baseline is not comprehensive and does not sufficiently consider future
technological developments. (3) The measures, their implementation modalities and potential synergies are not
described in sufficient detail. (4) The analysis of coherence with other actions is insufficient.
(C) What to improve (1) The assessment of the problem and its drivers should be further strengthened based
on a comparative analysis of main global competitors, by combining relevant data and information already presented in various parts of the report and the annexes. The report should build more on the evidence gathered during the preparation of the Impact Assessment to provide more detail on the evolution and maturity of different quantum domains and technological approaches. The report should further analyse
2
the drivers of the scaling-up gap and the potential for public intervention to address them.
(2) The dynamic baseline should take into account all relevant national and EU level policies and measures. The baseline should consider future technological developments and how they may impact quantum technologies, in particular related to AI.
(3) The synergies and coherence with recent or forthcoming EU initiatives, such as the European Innovation Act, the Public Procurement Act, the Chips Act 2 and ERA Act, should be analysed.
(4) The report should better describe how (competing) research and development pathways, including key scientific and technological bottlenecks and milestones, will be defined and updated. The description of the proposed measures should be expanded, providing clear information on the roles and responsibilities. The report should demonstrate how synergies among the measures will be ensured and fragmentation of the intervention is avoided. This concerns in particular the relationship between Quantum Grand Challenges (PM3), the Strategic Pilot Quantum Infrastructures and Strategic Quantum Projects (PM5), and Innovation Procurement (PM7). Similarly, the report should explain how services of different support structures (PM4, PM6, PM10, PM12, PM16) will interact and whether there will be a one-stop shop for EU firms and quantum science labs. The report should better explain to what extent existing structures, bodies and functions will be reused for the proposed measures. Further synergies between the envisaged measures should be explored to lower the number of distinct structures that would be established by the initiative.
(5) Assumptions which are not self-explanatory should be substantiated (e.g. ‘voluntary participation share’). The annex should report the calculations of costs and cost savings with sufficient detail.
Some more technical comments have been sent directly to the author Service.
(D) Conclusion The lead Service may proceed with the initiative. The lead Service must revise the report and its executive summary in accordance with the Board’s findings before launching the interservice consultation. Full title Quantum Act
Reference number PLAN/2024/2881
Submitted to RSB on 3 September 2026
Date of RSB meeting 23 September 2026
Electronically signed on 25/09/2026 15:54 (UTC+02) in accordance with Article 11 of Commission Decision (EU) 2021/2121
EN EN
EUROPEAN COMMISSION
Brussels, 25.11.2026 SWD(2026) 965 final
PART 1/2
COMMISSION STAFF WORKING DOCUMENT
IMPACT ASSESSMENT REPORT
Accompanying the document
Proposal for a Regulation of the European Parliament and of the Council
on a framework of measures for strengthening the Union's quantum ecosystem
(Quantum Act)
{COM(2026) 965 final} - {SEC(2026) 966 final} - {SWD(2026) 966 final} -
{SWD(2026) 967 final}
1
Contents
1. Introduction: Political and legal context ............................................................................ 3
1.1. Quantum in Europe and in the world ......................................................................... 4
1.2. Relevant EU policy framework, legislation and initiatives ....................................... 6
2. Problem definition ........................................................................................................... 10
2.1 What are the problems? ........................................................................................... 10
2.3. What are the problem drivers? ................................................................................. 17
2.4. How likely are the problems to persist? ................................................................... 26
3. Why should the EU act? .................................................................................................. 27
3.1 Legal basis ..................................................................................................................... 27
3.2. Subsidiarity: necessity of EU action ........................................................................ 27
3.3. Subsidiarity: added value of Union action ............................................................... 28
4. Objectives: What is to be achieved? ................................................................................ 28
4.1. General objectives .................................................................................................... 28
4.2. Specific objectives ................................................................................................... 28
5. What are the available policy options? ............................................................................ 29
5.1. What is the baseline from which the options are assessed? ..................................... 29
5.2. Description of the policy options ............................................................................. 34
5.3. Options and measure designs discarded at an early stage ........................................ 46
6. What are the impacts of the Policy Options? ................................................................... 48
6.1. Overview of the principal expected effects.............................................................. 48
6.2. Economic impacts .................................................................................................... 49
6.3. Competitiveness, innovation, market development and SMEs ............................... 50
6.4. Social and territorial impacts ................................................................................... 54
6.5. Governance and implementation feasibility ............................................................ 55
6.6. Uncertainty and sensitivity ...................................................................................... 56
7. How do the options compare? .......................................................................................... 56
7.1. Effectiveness in achieving the specific objectives ................................................... 56
7.2. Efficiency ................................................................................................................. 57
7.3. Coherence ................................................................................................................ 58
7.4. Trade-offs and synergies .......................................................................................... 58
7.5. Uncertainty and sensitivity ...................................................................................... 59
7.6. Subsidiarity, proportionality and overall comparison .............................................. 59
2
8. Preferred option ............................................................................................................... 60
8.1. Content of the preferred option ................................................................................ 60
8.2. Legal framework and implementation ..................................................................... 61
8.3. Main impacts of the preferred option....................................................................... 61
8.4. Budgetary implications ............................................................................................ 62
8.5. Simplification and improved efficiency ................................................................... 62
8.6. Application of the ‘one in, one out’ approach .......................................................... 62
9. How will actual impacts be monitored and evaluated? ................................................... 62
9.1. Monitoring arrangements ......................................................................................... 62
9.2. Core monitoring indicators ...................................................................................... 63
9.3. Evaluation ................................................................................................................ 63
3
1. INTRODUCTION: POLITICAL AND LEGAL CONTEXT
Quantum is widely recognised as a transformative technology breakthrough capable of solving
problems and performing tasks far beyond the capabilities of classical technologies. Quantum
technologies are mainly divided into three areas: quantum computing and simulation, quantum
communication, and quantum sensing and metrology1.
Quantum has the potential to revolutionise multiple economic and societal sectors, much like
the internet and more recently, artificial intelligence (AI). The Draghi report2 describes
quantum as “the next trailblazing innovation in the computing field, which could open new
opportunities for the EU’s industrial competitiveness and technological sovereignty”. While
many quantum technologies remain in the research or early commercialisation phase, their
impact is expected across many critical sectors including healthcare, energy, security, defence,
finance, manufacturing, or scientific research, among others. With uses ranging from quantum
magnetic resonance imaging (MRI) scanners, advanced sensing (e.g. for geophysics or
navigation) and secure communications to quantum computing solutions for sectors such as
logistics and finance, these technologies offer significant industrial and dual-use benefits,
making them essential for competitiveness, economic security, and the protection of critical
infrastructure. Ensuring that quantum technologies deployed in the EU align with European
standards and values is of strategic importance.
However, quantum technologies also pose significant security risks. Powerful quantum
computers could break widely used encryption, threatening data, communications, digital
identities – from critical infrastructure, through banking to government systems. The “harvest
now, decrypt later” threat further highlights the need to prepare for future quantum-enabled
decryption.
These emerging quantum technologies are developing faster than previously expected,
with a rapidly growing yet still nascent ecosystem. The field is at a critical inflection point,
where disruptions could occur at any time. Some technologies are transitioning from
research-driven development to early industrialisation, deployment, and market formation.
This shift is unlikely to follow a linear path: a scientific or engineering breakthrough, combined
with sufficient investment and industrial capacity, could rapidly reshape both technological
and competitive landscapes. In quantum computing, the real-world problems where a practical
advantage will first appear remain uncertain. Competing hardware approaches are still under
development, and progress depends not only on scaling hardware but also on advances in error
correction, algorithms, and integration with classical computing3.
Any assessment must reflect this complexity. The sector’s nascent nature means that
comparable data remain limited, with differences in definitions, samples, geographical
coverage, and reporting periods across sources, while quantum-specific trade and usage data
are largely unavailable. To address these gaps, the assessment triangulates programme data,
external mappings, stakeholder evidence, and selected quantitative indicators. Where evidence
is sufficient, impacts are estimated in monetary terms; otherwise, they are assessed using ranges
and qualitative scenarios. Dataset coverage and limitations are detailed in Annex 44; 5.
1 See Annex 7 for more details about quantum technologies. 2 Mario Draghi, The Future of European Competitiveness, Part A, September 2024, pp. 25, 31 and 58. 3 Geneva Science Diplomacy Anticipator (GESDA) & Open Quantum Institute (OQI), Intelligence Report on
Quantum Diplomacy in Action 2025–2026, Third Edition, Geneva, October 2025, pp. 4–5. 4 Quantum Europe Strategy, COM (2025) 363 final. 5 OECD and European Patent Office (EPO), Mapping the Global Quantum Ecosystem: A Comprehensive Analysis
Based on Innovation, Firm, Investment, Skills, Trade and Policy Data, 2025.
4
1.1. Quantum in Europe and in the world
Recognising the transformative and strategic importance of quantum technologies, the
Quantum Europe Strategy4 adopted in 2025 aims to position Europe as a global leader in the
field by 2030. Europe enters this new era with a strong foundation. It is the home to
groundbreaking discoveries and numerous Nobel Prize laureates – from Max Planck, Albert
Einstein, Niels Bohr, and Erwin Schrödinger to contemporary pioneers like Theodor Haensch,
Albert Fert, Serge Haroche, Anton Zeilinger, Alain Aspect, and Anne L’Huillier.
Today, around one-third of the world’s quantum companies are based in the EU, which also
boasts significant strengths in research, specialised talent, quantum infrastructures, and key
enabling technologies. Although nascent, European quantum companies show strong
commercial capabilities delivering roughly half of all procured machines in the world
(approximately 150). Europe also holds some key control-points in the quantum supply-chain
(e.g. any quantum computer installed worldwide includes European cryogenics or photonics).
Over the five years leading up to the Quantum Europe Strategy, the EU and its Member States
invested more than EUR 11 billion in quantum technologies, with research increasingly
producing breakthroughs with strong industrial and market potential.
However, Europe’s leadership in scientific excellence and its thriving start-up ecosystem have
not yet translated into comparable private-scale investment or industrial deployment.
As noted in the Quantum Europe Strategy, EU quantum companies attract only about 5% of
global private quantum investment, while US companies secure substantially more, enabling
them to scale faster and strengthen their global market position. The OECD-EPO mapping6
also highlights that the US benefits from a broader financing mix, including stronger later-stage
investment, whereas the European ecosystem remains reliant on early-stage funding. This
points to a conversion gap: Europe has strong scientific and entrepreneurial assets but lacks
sufficient later-stage finance, industrial capacity, and predictable early demand to scale
quantum technologies effectively.
Europe’s efforts must also be viewed in the context of global developments. As recognised in
the Quantum Europe Strategy, several major economies, in particular the US and China, but
also Australia, Canada, Japan, South Korea and the UK, are making substantial investments in
6 Idem, pp. 80–89. The analysis found that US-based investors represented on average 52% of global investment
in core quantum companies over 2016–2024.
Figure 1.1 Europe’s position in quantum technologies.
5
quantum technologies and strengthening their national quantum capabilities7. Key regions are
increasingly combining research support with industrial infrastructure, public procurement,
supply-chain measures, skills development and security policies8. By October 2025,
governments worldwide had announced an estimated USD 55.7 billion in quantum-related
commitments since 20139; 10.
As quantum adoption and commercialisation accelerate, the future clear winners are expected
to emerge within the next 5-8 years. The window of opportunity for Europe is narrowing, with
the US and China leading the race for the moment. The sector is now at a turning point, as
major global efforts seek to industrialise scientific and technological (S&T) results and bring
concrete products to market. The US benefits from deeper private capital, major investment by
Big Tech companies, public support and strong access to knowledge and skills; while China
relies more heavily on public investment and state-coordinated support. The global quantum
market –covering computing, communication and sensing– remains nascent. Valued at around
USD 5 bn in 2025, it could reach up to USD 97 bn by 2035, with quantum computing
accounting for the largest share11.
The differences in the public and private support are already reflected in available financing
indicators. Announced public quantum support up to 2025 is estimated at around EUR 8.6
billion in the EU, compared with EUR 5.3 billion in the US and estimates point at twice as
much in China, although these figures cover different periods, instruments and stages of
implementation and are therefore not directly comparable12.
Private financing shows a different picture: in 2025, quantum start-ups received around EUR
7 billion in investment in the US compared with EUR 1.1 billion in the EU. Major US
technology firms, such as IBM, Google, Microsoft and Amazon, are also investing directly in
quantum, while large-scale corporate investment remains far more limited in Europe.
Comparable data for China are not available, although evidence points to substantial state-led
investment and significant activity in quantum computing and quantum communication,
including Quantum Key Distribution (QKD)13.
Indicator EU US China
Quantum Venture Capital, 2012-2024 EUR 0.862
bn
EUR 2.9 bn n/a on comparable
basis
Investment in quantum start-ups, 2025 EUR 1.10 bn EUR 7.10
bn
n/a on comparable
basis
Announced public quantum support to
2025
EUR 8.6 bn EUR 5.3 bn EUR 13.6 bn
Table 1.1. Public support estimates are based on announced commitments
and are not directly comparable with actual expenditure because scope,
periods and instruments differ across jurisdictions.
Recent US measures also point to increased public support for the development and
commercialisation of quantum technologies. These include the 2026 Department of Commerce
7 See the national strategies and the analysis referenced in the Quantum Europe Strategy. 8 GESDA and OQI, Intelligence Report on Quantum Diplomacy in Action 2025–2026, 2025, chapter 2. 9 These figures should be interpreted cautiously because they include different time periods, instruments, and
stages of implementation. 10 OECD Publishing, Overview of National Strategies & Policies for Quantum Technologies, 2025. 11 McKinsey Quantum Technology Monitor 2026 12 Public-support estimates are based on announced commitments and are not directly comparable with actual
expenditure because scope, periods and instruments differ across jurisdictions. 13 OECD, An Overview of National Strategies and Policies for Quantum Technologies, pp. 28.
6
announcement of USD 2 billion in proposed federal incentives for quantum companies14 and
Executive Orders 14413 and 14412 of 22 June 2026, which respectively call for an updated US
quantum strategy and accelerate the transition of sensitive federal systems to post-quantum
cryptography.15. The Executive Order 14413 establishes a whole-of-government effort
covering quantum computing, sensing and networks. It marks a shift from fragmented research
support to coordinated policies aimed at building critical mass, industrial capabilities and
market demand16. Moreover, the US is tackling the issue of fragmentation through centralising
quantum efforts under the Genesis Mission, which aims to develop and deploy a scientifically
relevant, fault-tolerant quantum-computing capability17.
China too has pursued sustained, state-coordinated support for quantum technologies18. China
has an integrated quantum-communication network of around 4,600 km serving more than 150
users19. Chinese applicants accounted for 16,285 quantum patent families between 2005 and
2024, although only 5.8% of them were international20. By comparison, the US accounted for
around 6,400 patent families, member states of the European Patent Convention (EPC)21
collectively for 2,690, Japan for 2,636 and Korea for 1,608. While these figures point to China’s
considerable scale, differences in definitions, reporting practices, data coverage and the degree
of patent internationalisation limit direct comparison with the EU22.
The developments outlined above provide the broader context for assessing whether further
action at the Union level may be warranted. The problem analysis below identifies the main
challenges that could hinder the Union’s ability to achieve its strategic objectives in quantum
technologies.
1.2. Relevant EU policy framework, legislation and initiatives
The 2025 Quantum Europe Strategy serves as the immediate policy baseline for this
initiative. It outlines actions across five key areas—research and innovation; quantum
infrastructures; strengthening the quantum ecosystem; space and dual-use quantum
technologies; and quantum skills—and announces a future Quantum Act as a principal
implementation step4.
The Quantum Act initiative aligns with the Union’s broader competitiveness agenda. The
Draghi Report identifies quantum computing as a major emerging digital innovation,
highlighting Europe’s weaker position in private investment, company scale-up and access to
critical quantum technologies and components2. Building on that diagnosis, the
14 The proposed funding would provide $1 billion to IBM, $375 million to GlobalFoundries, $100 million each to
Atom Computing, D-Wave, Infleqtion, PsiQuantum, Quantinuum and Rigetti, and up to $38 million to Diraq. 15 Executive Order 14413 of 22 June 2026, Ushering in the Next Frontier of Quantum Innovation; Executive Order
14412 of 22 June 2026, Securing the Nation Against Advanced Cryptographic Attacks. 16 Executive Order 14413, Ushering in the Next Frontier of Quantum Innovation, 2026. It calls for an updated
national strategy, specifications and partnership models for a science-enabling quantum computer, as well as
potential advance market commitments, priority sensor projects, strengthened domestic manufacturing and supply
chains, new user facilities, workforce developments and ties to national-security applications. 17 U.S. Department of Energy, Energy Department Announces Initiative to Create and Deploy the World’s First
Scientifically Relevant, Fault-Tolerant Quantum Computers, 23 June 2026. 18 Ivezic, M., “China’s Quantum Networking and QKD — World’s Most Ambitious Quantum Communication
Program”, Post-Quantum, 7 April 2026. 19 OECD, An Overview of National Strategies and Policies for Quantum Technologies, pp. 28; Y.-A. Chen, Q.
Zhang, T.-Y. Chen et al., An integrated space-to-ground quantum communication network over 4,600 kilometres,
Nature 589, 214–219 (2021). 20 OECD and EPO, Mapping the Global Quantum Ecosystem, 2025, sections 3.3.1 and 3.3.4. 21 The EPO comprises all 27 EU Member States and 13 additional non-EU countries. 22 It is essential to point out that raw patent-family counts are not directly comparable indicators of technological
leadership, particularly given differences in internationalisation and filing practices.
7
Competitiveness Compass reaffirmed quantum as strategic for Europe’s future competitiveness
and announced the Quantum Strategy and a possible Quantum Act to address fragmentation,
align Union and national programmes and support investment in pan-European quantum
infrastructures23.
This initiative also fits within the Union’s economic-security, preparedness and defence
framework. Following the European Economic Security Strategy24, Commission
Recommendation (EU) 2023/211325 identifies quantum technologies as one of four areas
presenting immediate risks to technology security and leakage. Likewise, the Union’s foreign-
direct-investment (FDI) screening and dual-use export-control frameworks26 address specific
risks – for instance, the 2026 FDI Regulation27 identifies quantum as a critical technology
potentially subject to the mandatory investment screening under the relevant national control
mechanism. The Niinistö Report28 and the White Paper for European Defence29 further
emphasise the importance of critical and dual-use technologies for civilian and military
preparedness. The European Defence Fund invests in quantum technologies for navigation,
cryptography, and sensing to boost the military capabilities of EU armed forces30;31. The
initiative needs to be also seen in the context of the preparation of the next Multiannual
Financial Framework (MFF), the proposed European Competitiveness Fund32 and the next
Research Framework Programme.
Several regulatory initiatives already touch on quantum technologies, including the Chips Act
and the mandates of the Chips Joint Undertaking (Chips JU) and the EuroHPC Joint
Undertaking (EuroHPC JU)33. The Chips JU (or its successor) will continue to support
quantum-chip design, pilot lines, prototyping, testing and validation, while the EuroHPC JU
(or its successor) will continue to implement Union-level quantum R&I and infrastructure
activities across quantum computing and simulation, communication, sensing and metrology.
Additionally, the 2024 Critical Raw Materials Act34 secures sustainable EU supplies of
rare‑earths, high‑purity silicon and other key minerals needed for quantum chips and sensors.
The Quantum Act would not replace existing funding mechanisms or determine funding for
individual projects. Instead, it would provide cross-cutting strategic coordination and connect
these capabilities to the wider industrialisation pathway.
A quantum-specific initiative, touching also upon Post-Quantum Cryptography (PQC) would
need to complement existing cybersecurity and economic-security instruments and avoid
23 A Competitiveness Compass for the EU, COM (2025) 30 final. 24 European Economic Security Strategy, JOIN (2023) 20 final. 25 Commission Recommendation (EU) 2023/2113 on critical technology areas for the EU’s economic security for
further risk assessment with Member States. 26 Regulation (EU) 2019/452 and Regulation (EU) 2021/821. 27 Regulation (EU) 2026/1386 on the screening of foreign investments in the Union. 28 S. Niinistö, Safer Together Strengthening Europe’s Civilian and Military Preparedness & Readiness, 2024. 29 White Paper for European Defence Readiness 2030, JOIN (2025) 120 final. 30 EU Defence Industry Transformation Roadmap, COM(2025) 845 final. The Roadmap includes quantum
technologies among the disruptive technologies relevant to defence transformation. 31 European Commission, ‘From AI to Quantum: How the European Defence Fund shapes the future of EU
Defence Technologies’, News article, 15 December 2025. 32 European Commission, ‘The 2028–2034 EU budget for a stronger Europe’. 33 Existing Union instruments already cover parts of the quantum landscape, notably the Chips Act (Regulation
(EU) 2023/1781), the Chips JU (Regulation (EU) 2023/1782) and EuroHPC JU (Regulation (EU) 2026/150). The
amended EuroHPC mandate covers the full quantum ecosystem and implementation of the Union’s quantum-
technology agenda, including activities previously financed under HE and the Quantum Flagship. Any quantum-
specific initiative should complement these instruments and avoid duplication. 34 Regulation (EU) 2024/1252.
8
duplication. The NIS2 directive35 and the Cyber Resilience Act36 would continue to govern
cybersecurity risk-management and product requirements, while the Cybersecurity Act37
would remain the Union framework for cybersecurity certification. The Commission
Recommendation and subsequent Member State roadmap on PQC38; 39 would continue to
coordinate the transition towards quantum-resistant cryptography. For financial entities, the
Digital Operational Resilience Act remains the sector-specific framework for ICT risk
management, digital operational resilience testing, ICT-related incident reporting and critical
ICT third-party risk40. This Impact Assessment (IA) assesses whether quantum-specific
coordination, monitoring or referral arrangements are needed for this framework by addressing
quantum specific coordination and preparedness needs, without creating parallel supervisory
powers or duplicating reporting obligations. Lastly, ProtectEU Internal Security Strategy
identifies quantum technologies, the transition to PQC, the European Quantum Communication
Infrastructure (EuroQCI), Quantum Key Distribution (QKD), and quantum sensing as relevant
to internal-security preparedness41.
Existing instrument Contribution relevant to quantum
Quantum Europe Strategy Common political direction and actions across R&I,
infrastructure, ecosystem development, dual use and skills
EuroHPC JU
Union-level quantum R&I, quantum-computing
infrastructure, integration with high-performance computing
(HPC) and coordination with participating states
Chips Act / Chips JU Quantum-chip design, pilot lines, prototyping, testing and
validation
EuroQCI, CEF and IRIS² Terrestrial and space components of EuroQCI
European Defence Fund,
EDIP/EDPC42
Supports collaborative defence R&I and capability
development, thereby helping to translate emerging
technologies into deployable defence capabilities
EU Inc. Framework43
Tackles fragmentation in company law by creating an
optional EU-wide corporate regime, easing the establishment
and scale-up of European companies.
European Innovation Act44 Improves horizontal framework conditions for public
procurement of innovation.
Public Procurement Act45 Horizontal rules for public procurement.
35 Directive (EU) 2022/2555. 36 Regulation (EU) 2024/2847 (Cyber Resilience Act). 37 Regulation (EU) 2019/881 (Cybersecurity Act). 38 Commission Recommendation (EU) 2024/1101 on a Coordinated Implementation Roadmap for the transition
to Post-Quantum Cryptography. 39 A Coordinated Implementation Roadmap for the Transition to Post-Quantum Cryptography, June 2025. The
roadmap calls for Member States to begin the transition by the end of 2026 and for critical infrastructures to
transition no later than the end of 2030. 40 Regulation (EN) 2022/2554 on digital operational resilience for the financial sector. 41 ProtectEU: a European Internal Security Strategy, COM (2025) 148 final. 42 Defence/space-specific quantum activities remain subject to the priorities, work programmes, funding and
implementation arrangements of the relevant Union Defence instruments and the competent authorities. 43 European Commission, Proposal for a Regulation of the European Parliament and of the Council on the 28th
Regime Corporate Legal Framework – ‘EU Inc.’, COM(2026) 321 final, 18 March 2026.
44 European Commission, Proposal for a Regulation of the European Parliament and of the Council establishing a
framework of measures for strengthening the Union innovation ecosystem and amending Regulation (EU)
2017/1001 (European Innovation Act), COM(2026) 567 final, 9 September 2026. 45 European Commission, Proposal for a Regulation of the European Parliament and of the Council on public
contracts and concessions (Public Procurement Act), COM(2026) 590 final, 9 September 2026.
9
Strategic Tech for Europe
Platform (STEP)46
Horizontal framework that prioritises support available under
existing Union funding programmes and promotes
synergies.
Chips Act 2.047 / Cloud and AI
Development Act (CADA)48
These provide relevant digital infrastructures and
semiconductor pilot-line support mechanisms
EIC / InvestEU / Future
ECF/FP10
Improve access to finance, have general advisory functions
and funding
European Research Area Act49
Horizontal framework to strengthen the European Research
Area, including coordination of EU and national R&I policies
and investment, researcher mobility and knowledge
circulation.
Cybersecurity50, PQC and
standardisation frameworks
Cybersecurity requirements, certification structures, PQC51
transition coordination and quantum standards
FDI screening and dual-use
export controls
Screening of certain investments and control of listed dual-
use items and technologies
Union space instruments41 Space R&I, and space-related deployment
Table 1.2. Existing Union instruments and their contribution to quantum technologies.
The above mapping shows that the initiative would operate within an already extensive Union
policy landscape rather than create a parallel framework. Existing instruments would retain
their respective functions: EuroHPC JU and the relevant R&I programmes would implement
quantum R&I and infrastructures; the Chips framework would address semiconductor-related
capabilities; horizontal innovation, procurement and financing instruments would continue to
govern innovation support, public procurement and access to finance; and the relevant
cybersecurity, standardisation, economic-security, defence and space frameworks would retain
their existing competences. The Quantum Act would therefore reuse these instruments and add
quantum-specific arrangements only where residual coordination or delivery gaps remain.
This division of functions also applies to recent and forthcoming horizontal initiatives. The
European Innovation Act, Public Procurement Act and European Research Area Act are
expected to improve the general conditions for innovation, procurement and coordination of
R&I, while Chips Act 2.0 and CADA strengthen relevant semiconductor and digital
infrastructure frameworks. These initiatives can address part of the underlying barriers faced
by quantum actors, but do not by themselves provide an integrated quantum-specific approach
to EU–Member State coordination, links between research and industrial deployment, cross-
46 European Commission, Strategic Technologies for Europe Platform (STEP), available at: https://strategic-
technologies.europa.eu/index_en 47 European Commission, Proposal for a Regulation of the European Parliament and of the Council on a
framework of measures for strengthening the Union’s semiconductor ecosystem, repealing Regulation (EU)
2023/1781 (Chips Act 2.0), COM(2026) 504 final, 3 June 2026, 2026/0139(COD) 48 European Commission, Proposal for a Regulation of the European Parliament and of the Council establishing
a framework of measures for strengthening Europe’s cloud and AI ecosystem (Cloud and AI Development Act),
COM(2026) 502 final, 3 June 2026, 2026/0138(COD) 49 European Commission, Directorate-General for Research and Innovation, European Research Area (ERA) Act,
European Research Area Platform. 50 The Commission's 2026 proposal for a revised Cybersecurity Act also addresses post-quantum cryptography.
Its final content remains subject to the legislative process. 51 In this IA, PQC means classical public-key cryptography designed to resist quantum and classical attacks;
quantum communication uses quantum signals, with QKD as one application. PQC and QKD are distinct;
“quantum-safe” refers here to PQC.
10
domain infrastructure and testing, strategic project coordination, financing and first-buyer
pathways, or quantum-specific dependency intelligence.
This distinction is carried through into the dynamic baseline and the assessment of the policy
options, so that effects already expected from existing or forthcoming frameworks are not
attributed to the Quantum Act. Consequently, the initiative does not start from a blank page.
The landscape already comprises a range of programmes, infrastructures, regulatory
frameworks and policy initiatives addressing quantum-related aspects, although this is not their
primary objective. The IA assesses whether additional EU action is needed to strengthen links
between these instruments, pool resources around common priorities, facilitate the transition
from research to industrial deployment and reduce strategic dependencies, while avoiding
duplication and fully respecting the competences and functions of existing structures.
2. PROBLEM DEFINITION
2.1 What are the problems?
The evidence collected for this IA identifies three interrelated structural problems that hinder
the Union’s ability to translate its scientific strengths in quantum technologies into industrial,
market and resilience outcomes52; 53; 54. Section 2.1 outlines these problems, their scale and the
stakeholders affected. Section 2.2 analyses their root causes, while Section 2.3 examines their
likely evolution without further Union intervention. The three problems are:
• Slow conversion of research excellence into deployable quantum technologies (P1):
Fragmented efforts between the EU and Member States mean that research results and
prototypes do not consistently progress into validated, manufacturable and operational
products and services.
• Insufficient conditions for European quantum firms to scale and for early markets to
develop (P2): While the Union has a large and dynamic start-up ecosystem, firms struggle
to reach industrial scale, and early demand remains too shallow and fragmented to provide
predictable revenue streams or reference customers.
• Strategic dependencies and insufficient resilience in quantum value chains (P3): The
Union relies on concentrated and, in some cases, non-EU sources for specialised
components and enabling technologies, with limited visibility and mitigation of these
dependencies.
These problems have a clear cross-border dimension. Research programmes, firms,
infrastructures, investors, buyers and suppliers operate across national borders, while
capabilities, finance and demand are unevenly distributed among Member States. As a result,
fragmented coordination, discontinuities between research and deployment, limited scale-up
conditions and dependencies in critical value chains can affect projects, firms and users across
the Union55.
52 Lewis et al., Future Directions for Quantum Technology in Europe, 2025; EIB, Investment Report 2025/26, pp.
139, 254; OECD and EPO, Mapping the Global Quantum Ecosystem, 2025, pp. 124, 127; QuIC, Response to the
Call for Evidence on the EU Quantum Act, 2025, pp. 5–7. See these sources on fragmented markets, scale-up
finance, infrastructure access and discontinuities between R&I and deployment. 53 Idem, pp. 124, 127, identifying weaker EU translation of innovation into market opportunities and a policy shift
towards adoption, commercialisation, and experimentation. 54 QuIC, Response to the Call for Evidence on the EU Quantum Act, 2025, pp. 5–7, calling for continuity from
R&D to industrialisation through grants, equity, strategic procurement, and mitigation tools. 55 Regulation (EU) 2024/2847 (Cyber Resilience Act); see also Sections 2.1 and 2.2; see Annex 4 for the evidence
concerning the cross-border operation of research programmes, infrastructures, firms, supply chains and users.
11
Figure 2.1. Intervention Framework.
2.2.1. P1 – Slow conversion of research excellence into deployable quantum
technologies
The first problem is that the EU strengths outlined in Chapter 1 do not yet consistently translate
into technologies that can be manufactured, integrated, qualified and deployed in operational
environments.
EU programme data show progress towards higher Technology Readiness Level (TRL)56
activities. Of the 283 quantum-related projects mapped under Horizon 2020 and Horizon
Europe, 83 (29.3%) were classified as higher-TRL actions. Among concluded projects, this
share increased from 21% in 2023 to 45% in 2025, indicating that the shift towards validation
and deployment has accelerated since 2023. Separately, among the subset of validated EU
quantum technologies, an estimated 65-70% has progressed to a market product, suggesting
that the main bottleneck lies earlier in the innovation pipeline, between research and industrial
validation57. This interpretation is consistent with both OECD/EPO and industry evidence that
Europe combines strong quantum innovation capabilities with weaker translation into market
opportunities. Discontinuities between R&D, industrialisation and deployment are a constraint
to European scale-up58. Evidence on patents and value-capture relevant to firm scale-up is only
beginning to emerge and is examined under P259. In the lack of sufficient comparable
international evidence demonstrating that EU quantum technologies are generally at lower
TRLs than comparable technologies in other regions, the available evidence suggests that
industrial validation remains uneven.
Technological maturity varies substantially across quantum domains and technological
approaches, from specialised applications already on the market to technologies still in early
56 ESA - Technology Readiness Levels (TRL) measure a technology's maturity on a scale from 1 to 9, progressing
from basic scientific research (TRL 1) to fully proven operational use (TRL 9). 57 See Annex 11, on quantum technologies initiated by EU projects that have led to revenue generation. 58 OECD and EPO, Mapping the Global Quantum Ecosystem, 2025, pp. 124 and 127; QuIC, Response to the Call
for Evidence on the EU Quantum Act, 2025, pp. 5–7. 59 See Annex 11, section 2.1 on EU-funded quantum R&I projects and section 2.2 on patent activity in quantum
technologies .
12
industrial, R&I or pilot stages. As quantum technologies are still emerging and evolving
rapidly, the indicators below provide an indicative picture of technological and commercial
maturity across the three domains. The global market estimates provide a complementary
indication of the current and expected commercial scale of each domain, although market size
should not be interpreted as a direct measure of technological maturity.
Domain Current maturity / market evidence Global
market60
Quantum
computing
Current quantum computers remain largely prototypes or early
commercial systems, based on different competing hardware
platforms61. Key challenges are fault tolerance, error correction
and scalability. Commercial revenues are emerging, while fault-
tolerant quantum computing remains a longer-term objective.
2024: USD
650–750 mln
2025: > USD 1
bn
2035: USD 43–
71 bn
Quantum
communicatio
n
QKD and Quantum Random Number Generators (QRNG) are
already deployed in specialised applications, while quantum
repeaters, entanglement distribution and advanced quantum
networks remain at earlier R&I and pilot stages.
2024: USD 1.3–
1.6 bn
2035: USD 11–
15 bn
Quantum
sensing
Quantum clocks are already deployed and QRNGs are
commercially available. Next-generation applications in
gravimetry, navigation, industrial and medical sensing are
moving from prototypes towards deployment. Europe remains in
the race.
2024: USD 2.8–
3.1 bn
2035: USD 7–
10 bn
Table 2.1. Comparison of maturity and market evidence across quantum domains.
This domain-level picture is completed by firm-level evidence on commercialisation. Evidence
gathered by the JRC from a sample of 140 EU-based quantum companies indicates that
approximately 72 % currently market products, while 21 % do not and the status of the
remaining 7% is uncertain. Commercial readiness varies considerably across domains. QKD
and PQC are the most market ready, with 80 % and 85 % of firms, respectively, already
commercialising products. By contrast, quantum sensing and quantum computing are the least
market ready: only 61 % of firms in the quantum sensing segment, 68 % in the quantum
computing software segment, and 71 % in the quantum computing hardware segment currently
market products62. Standardisation also differs across quantum domains. Around 70% of 165
quantum standardisation mapping concerned quantum communication and PQC, while around
20% concerned quantum computing and sensing63.
Every domain in quantum technology faces overarching challenges that are reflected in the
problem drivers below. Across the three domains, there is a mismatch between investment and
results: significant investment has not yet been translated into industrial scale and broad market
adoption commensurate with Europe’s scientific and technological strengths, nor the disruptive
effect quantum technologies are expected to have. Supply chain vulnerabilities, as well as talent
bottlenecks are also observed across all TRLs of quantum technologies. Each domain also faces
specific challenges, albeit these are mostly scientific and engineering challenges and less
related to policy and economic conditions.64
60 McKinsey & Company, Quantum Technology Monitor 2026: A commercial tipping point, 2026 61 These include superconducting circuits, trapped-ion, neutral-atom, photonic systems, and semiconductor/spin-
based approaches. These approaches remain competing technological pathways at different levels of maturity,
and no single approach has yet emerged as the definitive route towards scalable fault-tolerant quantum computing. 62 See Annex 11, section 4.1, on the commercialisation status of EU quantum companies. 63 See Annex 11, section 3, on standardisation. 64 For instance, Quantum Computing is entering the early fault-tolerant era but still requires millions of physical
qubits to generate thousands of logical, error-corrected qubits, which still remains a significant engineering
13
The relevant gap is therefore not a uniform failure to reach a single TRL, but rather the absence
of sufficiently continuous pathways tailored to the maturity and industrial requirements of each
technology. The actors most directly affected by this gap include research teams seeking to
move results beyond the project stage; start-ups and SMEs unable to finance specialised
facilities internally; research and technology organisations operating shared infrastructure;
industrial or public users seeking validated solutions.
The observable outcome is a longer and less predictable progression from research results to
demonstrators, products, or operational services. This reduces the cumulative industrial return
from European research and increases the risk that promising technologies are industrialised
elsewhere. Therefore, the initiative cannot eliminate the important constraint of scientific and
engineering uncertainty as such, particularly for technologies like large-scale fault-tolerant
quantum computing. Therefore, the assessment focuses on policy-addressable conditions (e.g.
coordination, access to infrastructure, finance, demand, skills, and assurance) that determine
whether sufficiently mature results progress efficiently to validation and deployment.
The causes of this problem, including dispersed prioritisation, limited continuity between
funding stages, uneven access to shared infrastructure and shortages of industrial engineering
skills, are examined under Problem Drivers PD1, PD2 and PD3 in Section 2.2.
2.2.2. P2 – Insufficient conditions for European quantum firms to scale and for
early markets to develop
The Union has one of the world’s largest and youngest populations of quantum companies. A
Joint Research Centre (JRC) mapping65 identified 141 EU-based firms out of 441 in a global
sample, with around 60% of these EU firms established after 2018. However, the age profile
of firms alone does not demonstrate whether they subsequently progress to industrial scale.
Between 2020 and 2025, EU27 quantum companies raised around EUR 509 million in early-
stage venture capital, compared with EUR 302 million for US firms. At later stages, by contrast,
US firms raised around EUR 2.2 billion, 4.5 times the EUR 493 million raised by EU27 firms66.
This later-stage financing gap is consistent with the EU’s more limited pool of private scale-
up capital compared with the US. The observed problem is therefore not a lack of
entrepreneurial creation, but the limited progression of firms from start-up and prototype stages
to sustained industrial scale within the Union.
Scaling a quantum firm requires more than successful R&I. It requires a clear path from
prototype to industrial production, including access to patient later-stage capital, specialised
testing infrastructure, skilled technical and commercial teams, effective intellectual property
management, and lead customers that can turn pilots into reference deployments and repeat
demand. In the Union, these conditions remain insufficiently connected: financing is
concentrated at earlier stages, industrial capabilities and support are dispersed across
programmes and Member States, European patenting activity is dispersed across many actors,
and early demand remains narrow and unpredictable.
These weaknesses are mutually reinforcing, making it harder for firms to industrialise and
reach sustained scale in Europe67. The financing evidence illustrates this discontinuity.
challenge. In Quantum Communications, quantum signals cannot be amplified using traditional signal boosters,
thus being still limited to a couple hundred kilometres of reach. Lastly, a key bottleneck in Quantum Sensing
concerns isolating extremely precise sensors from ambient background noise, thermal drift and mechanical
vibrations that come when tested in the real-world environment. 65 Lewis et al., Future Directions for Quantum Technology in Europe, 2025. 66 See Annex 11, section 4.2, on venture capital investment by finance stage. 67 See OECD and EPO, Mapping the Global Quantum Ecosystem, 2025, pp. 80–89, 124–127; EIB, Investment
Report 2025/26, pp. 139, 254; QuIC, Response to the Call for Evidence on the EU Quantum Act, 2025.
14
Between 2012 and 2024, EU quantum firms raised approximately EUR 862 million in venture
capital, compared with EUR 2.9 billion for US firms68. The later-stage comparison above
shows that this difference is particularly pronounced as firms move beyond early-stage
financing. This financing gap increases the risk that promising EU quantum companies look
abroad for growth capital.
According to the 2026 McKinsey Quantum Technology Monitor, government and institutional
funding accounted for 19% of global quantum start-up investment in 2022, but only 3% in
2025, as private capital became dominant. It also reports that the top 10 financing or investment
transactions involving quantum companies in 2025 totalled EUR 6.6 billion. Of these, eight
involved companies headquartered in the US, one in the UK and one in Canada. No EU-
headquartered company appeared in the top 1069. Furthermore, only 6 EU quantum companies
have secured growth rounds exceeding EUR 100 million, compared with 28 globally.
In the EU, limited private scale-up finance makes public instruments especially important for
quantum start-ups and scale-ups, notably the EIC Fund and the EIC STEP Scale Up70.
However, support usually amounts to only a few million or low tens of millions per company
and remains fragmented across EU and national programmes. This spreads resources across
priorities too thinly rather than targeting key technological bottlenecks, while forcing
companies to spend time navigating multiple competitive calls instead of focusing on
industrialisation. In addition, fragmented national public funding further weakens Europe’s
position, as Member States (MS) invest in different priorities and there is insufficient joint
programming at EU level. At the same time, US firms benefit from deeper private capital
markets and substantial investment by major technology companies. Comparable private-
financing data for China are not sufficiently transparent, although available evidence points to
substantial state-led investment and significant activity in quantum computing and quantum
communication.
As commercialisation gains traction, revenue gaps highlight the EU challenges of industrial
scale-up and market development. McKinsey estimates that quantum computing revenues
exceeded EUR 0.9 billion in 2025 and are projected to grow to EUR 2.8–3.8 billion by 202871.
Patent evidence offers a complementary perspective on scale-up and value-capture conditions.
An ad hoc EPO analysis covering more than 31,700 published quantum-related patent families
(2005-2024) finds that the European patenting area (the 40 contracting states of the European
Patent Convention), has a substantial and diversified inventive base, ranking second only to
the US in applicants and international patent families. However, European activity is dispersed
across firms and public research organisations, while the largest portfolios are concentrated
among a limited number of non-European applicants. This does not indicate weaker patent
quality or market power but suggests that smaller European actors may struggle to finance
international protection, participate in standardisation activities or negotiate licensing or cross-
licensing arrangements as technologies mature72. The methodology, definitions and limitations
68 Ibid, p. 54. 69 McKinsey & Company, Quantum Technology Monitor 2026: A commercial tipping point, 2026, p. 37. 70 Between 2021 and 2024, the EIC dedicated around EUR 350 million to quantum-technology start-ups. EIC
STEP Scale Up investments can reach up to EUR 30 million per company. 71 McKinsey & Company (2026), Quantum Technology Monitor 2026, p. 8. 72 EPO, ad hoc patent analysis prepared for the Quantum Act IA, 2026, unpublished supporting evidence; OECD
and EPO, Mapping the Global Quantum Ecosystem, 2025. Patent counts indicate inventive activity and protection
strategies; they do not directly measure technological quality, commercialisation, freedom to operate or market
power.
15
of this analysis are detailed in Annex 4, with supporting tables in Annex 11.
Beyond scientific and technical expertise, suppliers and users increasingly require enterprise
capabilities, such as product management, business development, communication of use cases,
procurement and technology adoption. This reflects the gradual commercialisation of quantum
technologies and the need to translate technical capabilities into products, services and
demonstrable user value.
The early market remains narrow. Global quantum-computing revenue exceeded just EUR 0.9
billion in 202573, with activity focused mainly on public, research and specialised early-adopter
markets rather than broad commercial deployment. Within the EU, public investment has
created important demonstrators and infrastructures, including the EuroHPC JU quantum-
computing procurements74. However, the early stage of technology and these early purchases
and pilots have yet to develop into a predictable, repeatable Union-wide demand pipeline75.
This situation affects several groups:
• quantum start-ups and scale-ups, which face uncertain revenue, limited reference
customers and difficulty financing industrial expansion;
• industrial and public users, which encounter uncertain business cases, integration costs
and limited access to comparable and validated solutions;
• investors, which grapple with technological uncertainty and weak visibility over future
demand;
• public procurers, which face technological uncertainty, limited reference deployments
and insufficiently comparable performance information.
The resulting risk is that the Union finances the creation and early development of quantum
firms but captures a smaller share of their subsequent growth, manufacturing, employment and
intellectual-property value. This may incentivise firms to seek capital, customers, listings,
industrial partners or ownership outside the Union. At the same time, weak supplier scale and
weak domestic demand reinforce one another, slowing adoption by European businesses and
public authorities.
The causes of this combined scale-up and market-formation problem are examined under PD2
73 McKinsey & Company, Quantum Technology Monitor, 2026. 74 The EuroHPC JU: Up to now, the EuroHPC JU has procured six quantum computers and co-funded two more.
See Quantum Europe Strategy, table 1 for a global overview of quantum computers installed. 75 See Annex 11, section 4.4, on demand-side support and public procurement. Demand remains concentrated in
public, research and specialised early-adopter markets and that pilots do not yet consistently convert into repeat
procurement.
Figure 2.2 EU quantum entrepreneurship and scale-up indicators. Indicators come
from different samples.
16
to PD6 in Section 2.2.
2.2.3. P3 – Strategic dependencies and insufficient resilience in quantum value
chains
Quantum technologies rely on specialised materials, components, equipment, software, and
services.76 International sourcing is not inherently problematic, and full self-sufficiency would
be neither realistic nor economically desirable. However, a dependency becomes strategically
relevant where supply is concentrated, substitution is difficult or slow, and disruption could
materially affect deployment or security-sensitive applications.
The supporting study77 mapped 47 critical components and sub-components used in selected
quantum-computing modalities78 and shared control systems79. It assessed whether EU-based
suppliers or alternative sourcing options could be identified. Nine components or sub-
components had no identified EU-based supplier, while only half of the mapped sub-
components had an identified dual-sourcing option. The most acute gaps were found at the sub-
component level, particularly in control electronics and specialised materials. Since some
inputs are used across multiple quantum modalities, disruptions could simultaneously affect
several technology pathways80. Programme and stakeholder evidence also highlighted
dependencies involving specialised photonic and control components, proprietary non-EU
design tools, hardware and cloud services. The mapping is indicative: it covers selected
technologies and identifies supplier presence but does not fully assess production capacity,
substitutability, ownership, inventories or the probability of disruption. Nevertheless, it
demonstrates that concentrated dependencies exist and that their visibility and mitigation
require more systematic monitoring81.
Dependencies may also arise through foreign ownership or investment relationships and be
reinforced by the absence of common benchmarks needed to qualify alternative components.
These forms of dependency can create technical and commercial lock-in, even where nominal
alternative suppliers exist. These dependencies already have operational consequences. Supply
constraints are already affecting project delivery79.
The actors most directly affected include quantum equipment and component manufacturers,
start-ups integrating externally sourced inputs, research infrastructures, public procurers and
operators of critical or security-sensitive systems. Public authorities are also affected, as no
single firm or Member State has full visibility over cross-border, multi-tier supplier
dependencies.
76 Examples include specialised materials and gases, cryogenics, lasers and photonics, detectors, vacuum
equipment, control electronics, RF components, design tools and cloud/computing access. 77 PPMI and d-fine Commission Study for strengthening the evidence on the IA for the European Quantum Act,
Final Report, June 2026. See Annex 11, section 6, on supply chain dependencies and vulnerabilities. 78 Modalities refer to various technological platforms and associated architectures for quantum computing. 79 In the documented sample, supply issues accounted for 73% of project extensions; eight affected projects had
average delays of 191 days. The sample is illustrative, not representative. Around EUR 747 million of EUR 3.68
billion in mapped EU quantum funding supports domestic capabilities, pilot lines and component suppliers;
replacement of critical components can exceed 12 months. See Annex 11, section 6.3 and Annex 2 for more
information on the targeted industry survey. 80 Quantum-specific imports cannot be robustly isolated from broader customs categories; dependency is therefore
assessed using supplier location, alternative sourcing, substitutability, lead times and documented delays. Recent
ownership changes involving European quantum capabilities are illustrative only., Annex 11. 81 Documented examples include changes in supply conditions for specialised components, reliance on proprietary
non-EU design tools and cloud services, and reduced transparency following the acquisition of a quantum-
communication supplier. These cases are illustrative and not representative estimates for the sector. See Annexes
2 and 11, tabs 66, 68, 70, 84; Section 2.2.7.
17
These vulnerabilities cannot be effectively addressed through isolated national action and
therefore require coordinated efforts at Union level. Moreover, public authorities are directly
concerned in their role as procurers and operators of critical and security-sensitive systems
where supply disruptions can undermine service continuity and security.
The resulting problem is insufficient resilience. Supplier concentration, limited substitutability
and incomplete visibility create uncertainty and chokepoint risks. Disruptions, changes in
export conditions, acquisitions, supplier exits or technical lock-in may delay projects, increase
substitution costs and deepen dependence on non-EU technologies. These consequences are
not purely prospective: quantum technologies and quantum-enabled components are already
used in established applications such as medical imaging, precision timing and sensing, and
are increasingly deployed in communications, navigation, defence and space systems. The
consequences could become more significant as deployment expands into further critical
infrastructure and other security-sensitive systems. The underlying causes are examined under
PD7 in Section 2.2.7.
2.2.4. What are the main consequences?
The scale and timing of further quantum breakthroughs remain uncertain, but this uncertainty
does not reduce the potential impact of the problems identified above on the private and public
sectors. Given existing applications and the potential for rapid, non-linear progress, these
problems may increase the likelihood of four main types of consequences during the
assessment period:
• Lower industrial value capture and competitiveness. Excellent European research does
not automatically translate into EU market uptake; public investment is thus likely to
generate smaller returns, fewer scaled suppliers, manufacturing activities, and deployable
products than would be expected from the Union’s scientific and entrepreneurial base. This
could prevent Europe from translating these strengths into sustained industrial leadership
and market share, while increasing dependencies.
• Slower uptake and foregone benefits for users. Businesses and public authorities will
have access to fewer validated European solutions, face higher integration costs and
experience slower diffusion of potentially useful quantum applications.
• Greater strategic and security exposure. Dependence on concentrated non-EU inputs
and platforms may increase the risk of disruption, lock-in and loss of control in sensitive
or dual-use applications.
• Reduced attractiveness for capital and specialised talent. Limited scale, uncertain
demand and delayed deployment may make stronger ecosystems abroad increasingly
attractive to investors, companies and highly skilled personnel.
These consequences could reinforce one another. Limited deployment may weaken the
revenues of quantum firms and reduce investor confidence; weaker firms may be less able to
diversify their suppliers or support users, while continued external dependence may further
reduce the Union’s capacity to capture industrial value and remain or become leader in this
field.
2.3. What are the problem drivers?
The three problems identified in Section 2.1 stem from seven underlying drivers: coordination
failures, limited access to shared infrastructure, human-capital constraints, financing
conditions, weak early demand, information gaps and trust mechanisms, and the management
of strategic dependencies.
These drivers are reinforced by structural features of the global quantum sector, including high
technological uncertainty, long development cycles and intensifying international competition.
18
However, the analysis does not consider these factors as the Union or Member State action
cannot realistically influence them.
The drivers are also closely interlinked. Limited access to test and validation infrastructure, for
example, raises both technological and financing risk; incomplete standards and benchmarks
make procurement and supplier substitution harder; and weak demand undermines firms’
ability to attract growth capital. The following subsections set out the main causal mechanism
and evidence for each driver.
The evidence base is uneven across problem driver areas. It is strongest for mapped firms,
financing rounds, infrastructures, procurement schemes and selected quantum-computing
components; it is weaker for infrastructure utilisation, conversion from pilots to procurement,
quantum communication and sensing supply chains, user-side adoption and quantum-specific
trade flows. As most quantum components fall under broader customs and product
classifications, robust estimates of quantum-specific imports are not possible.
2.3.1. PD1 – Insufficient alignment of public priorities and investment
Public support for quantum technologies in Europe is high, but it is spread across many separate
EU, national and regional programmes. In the last five years, more than EUR 11 billion has
been invested or committed by the EU and its Member States, of which around EUR 9 billion
came from Member States82. As of March 2026, 14 Member States had a quantum-specific
strategy in place and four more were preparing one83.
This decentralised model is not a problem, because Member States have different strengths and
priorities, but separate decisions do not always result in an efficient Union-wide allocation of
effort, funding and skills. Additionally, no single authority has the mandate and the full
overview to optimise a combined EU and national portfolio. The absence of efficient
coordination can lead to an inefficient use of resources and hinders the achievement of common
technology targets that require immense investment.
Similar technologies and infrastructures may be funded in parallel, while other areas may
remain under-supported or lack continuity and scale. The targeted consultation evidence points
to parallel calls addressing similar technologies, different programme conditions and multiple
reporting requirements for projects receiving both Union and national support. These examples
show the coordination problem even if not all parallel activities are an unnecessary duplication.
The evidence suggests extensive parallel support across all three main quantum domains and
across major technology platforms using atoms, ions, superconductors, semiconductors,
photons or vacancy centres. In quantum computing and simulation alone, 92 national-level
actions were identified alongside 34 EU-level actions, with similar patterns in sensing and
metrology, communication and enabling technologies84. This underlines the need for better
visibility and coordination across the full funding landscape.
Existing mechanisms have until recently not provided a regular way to compare Union and
national priorities, investments and implementation milestones. The expanded EuroHPC JU
mandate now offers a common EU-level implementation platform for many quantum activities.
However, because the amended Regulation does not require alignment of all EU and national
82 The Quantum Europe Strategy reports more than EUR 11 billion of Union and Member State investment
whereas the external mapping identified EUR 7.6 billion of commitments in the Member States covered. 83 Czechia, Denmark, Germany, Ireland, Spain, France, Italy, Luxembourg, the Netherlands, Austria, Romania,
Slovenia, Finland and Sweden. A further four Member States were preparing one: Bulgaria, Greece, Poland and
Slovakia. See Annex 11, section 1, on the National Quantum Policy Measures. 84 PPMI/d-fine mapped 92 national/34 EU-level actions in quantum computing and simulation, 43/18 in sensing
and metrology, 24/9 in quantum communication and 11/10 in enabling technologies. See Annex 11.
19
strategies, programmes or budgets, important coordination gaps are likely to remain. These
coordination gaps are reinforced by the structure of funding itself. EU quantum funding is
fragmented across many relatively small commitments and is mainly focused on academia
rather than industry. This matters because EU firms have fewer alternative private funding
sources. The mapped collaboration ecosystem reflects this imbalance: 61% of collaborations
are research-to-research, while only 9.6% involve industry. Funding is also less concentrated
within established quantum clusters than in the US or China, making it harder to bring together
talent, infrastructure, industrial partners and co-investment at the scale needed for
commercialisation85;86.
Overall, PD1 contributes to two core problems: to P1, because dispersed priority-setting
weakens the sustained concentration of resources needed to move quantum technologies
through successive stages of development; and to P2, because fragmented instruments and
funding conditions make it harder to build cross-border projects, combine financing sources
and support companies consistently from research to industrial scale-up.
2.3.2. PD2 – Limited and uneven access to quantum industrialisation
infrastructure
Quantum industrialisation requires more than proof of concept. Depending on the technology,
firms and research teams need access to specialised infrastructure, such as fabrication and
cleanrooms facilities, packaging, cryogenic or vacuum environments, advanced testing and
experimentation tools, calibration methods, metrology, system integration, security evaluation
and technology and system qualification facilities.
Because many of these facilities are expensive and highly specialised, individual start-ups and
SMEs cannot finance and operate them alone, making shared access essential. The evidence
does not point to a general shortage requiring many new facilities but rather to limited visibility
of existing capabilities, uneven access, insufficient user support, weak links between facilities
and company development pathways and in some areas missing capability or excess demand.
Additional or upgraded capacity would be justified only where European mapping shows a
clear gap.
The supporting PPMI/d-fine study shows that only 18 of the 91 mapped testbeds and 8 of the
27 mapped pilot lines were identified as open to start-ups87. Where data were available, average
waiting times were about six months for Qu-Test88 testbeds and 3-4 months for mapped
quantum-communication testbeds. While not representative for all Union facilities, these
figures support stakeholder concerns that timely access can be a bottleneck.
Stakeholders also report practical barriers to access, including unclear or project-specific
eligibility criteria, limited capacity, waiting times, costs, IP conditions and insufficient
technical support for smaller firms. These barriers vary across facilities and Member States and
should not be treated as uniform across the EU.
85 Industry participation in quantum collaborations (EU 9.6%, US 23%, Japan 28%). Source: Erixon, F., Dugo, A.,
Pandya, D. and Sisto, E. (2025), Mapping the Quantum Ecosystems: How Are Economies Positioning Themselves
for Innovation Success, ECIPE Occasional Paper No. 08/2025, European Centre for International Political
Economy, Brussels, pp. 21–22, Figure 7. 2.2. 86 Geographic concentration of quantum funding (EU 77%, US 98%, China 99%). Source: Erixon, F., Dugo, A.,
Pandya, D. and Sisto, E. (2025), Quantum Clusters: Ranking the World’s Deep-Tech Epicentres, ECIPE
Occasional Paper No. 15/2025, European Centre for International Political Economy, Brussels, p. 45, Annex 2,
Figure 15. 87 See Annex 11, section 5 on the mapping of testbeds and pilot lines. 88 Qu-Test is a multi-partner project funded under Horizon Europe since 2023 aiming to develop and provide
infrastructure for testing and experimentation for quantum technologies in Europe.
20
Existing EU initiatives partly address this driver. The EuroHPC JU provides access to
quantum-computing systems integrated with supercomputers; the EuroQCI initiative supports
communication infrastructures and test environments; and the six quantum pilot lines currently
under development under the Chips JU will expand fabrication and validation capacity for
quantum chips. Despite these activities, the fundamental issues mentioned above remain.
PD2 contributes to P1 by slowing technological maturation and validation. It contributes to P2
because firms that cannot demonstrate reproducible performance, meet customer requirements
or qualify production processes face higher financing risk and greater difficulty securing
customers.
2.3.3. PD3 – Shortages of industrial, deployment and user-side skills
Quantum industrialisation demands skills far beyond academic quantum science: engineers,
technicians, software developers, systems integrators, product specialists, cybersecurity
experts and business-development professionals who can bridge quantum knowledge with
industrial disciplines. Users and public procurers also need expertise to assess claims, identify
use cases, manage procurement and integrate quantum technologies into existing systems.
Europe boasts a strong scientific and doctoral talent with around 40 specialised master’s
programmes in quantum technologies. However, graduate output is projected to fall short of
industrial demand, especially in engineering, software, systems integration and deployment-
oriented profiles89. There is also growing demand for business and commercialisation skills,
such as product management, business development, user engagement or the ability to
communicate quantum use cases90. The targeted industry survey reinforces this finding: 29 of
41 respondents (71%) considered specialised skills and talent mobility a significant barrier,
with gaps in cryogenics, nanofabrication, photonics, control systems, systems engineering and
interdisciplinary hardware-software profiles. As the survey was targeted and not statistically
representative, these results should be treated as evidence of stakeholder experience rather than
an EU-wide estimate91.
A major challenge is the to keep the education and training offers up to date with the rapid
evolution of skill demands. Start-ups and SMEs often lack resources to invest in broadly
transferable training, and education providers may not have timely insights and flexibility to
constantly adapt to emerging industrial needs. Similar issues affect user-side training.
Mobility and talent retention further strain the supply of experienced personnel. Targeted
consultations92 indicate that better-funded ecosystems and large non-EU technology companies
may offer more attractive career prospects. Complementary job-posting evidence also reveals
an asymmetry: 7.7% of EU-based quantum vacancies in the study were posted by US-
headquartered firms, compared with 1.3% of US-based vacancies posted by EU-headquartered
firms, indicating a stronger recruitment presence of US-headquartered companies in the EU
quantum labour market.93.
PD3 contributes to P1 where shortages in engineering and technical profiles delay technology
development, processes and products, and the operation of shared infrastructure. It contributes
89 Strategic Research and Industry Agenda 2030, 2024 (SRIA), p. 168; OECD and EPO, Mapping the Global
Quantum Ecosystem, 2025, Chapter 6, on evolving and cross-disciplinary quantum skill requirements; QuIC,
'Response to the Call for Evidence on the EU Quantum Act', 2025, pp. 14–16. 90 Sydney Quantum Academy, National Quantum Industry and Workforce Development Review, 2023. 91 See Annex 4 and the corresponding source worksheet in Annex 11, tab 84 on the EU indicators. 92 More information on the targeted consultation: Annex 3, specifically in sections 3.5, 3.6 and 3.10. 93 Goorney, S. et al., The Quantum Technology Job Market: Data-driven Analysis of 3,641 Job Posts, EPJ Quantum
Technology, 2026. The dataset covered vacancies collected between March 2023 and June 2024.
21
to P2 where suppliers cannot scale their teams and potential users lack the expertise needed to
become customers or move to deployment.
2.3.4. PD4 – Insufficient later-stage risk capital and financing continuity
Quantum companies face long development cycles, high technological uncertainty and
significant upfront costs for equipment, engineering and validation before generating
predictable revenues. This creates an information asymmetry between firms and investors, who
must assess complex technical claims and finance companies over extended periods with
unclear commercial outcomes. The gap is especially critical during scale-up, when financing
needs grow but technical and market risks remain high. Private investors also fail to capture all
societal benefits of quantum investment, such as knowledge spillovers, workforce development
and economic-security benefits. IP management, patent portfolios, and freedom-to-operate
assessments also affect company valuation and investor confidence, particularly for start-ups,
spin-offs and research-intensive SMEs.
This dynamic aligns with observed financing patterns described in Section 2.1. EU firms raised
significantly less venture capital than US firms between 2012 and 2024, participating in only
35 of the 188 mapped funding rounds above EUR 25 million. The disparity is most evident in
later-stage growth and public-market financing, where EU firms remain underrepresented
despite global investment growth in 202594. For firms with a recorded Series A round, EU
companies took an average of 4.53 years to reach this stage, compared to 3.76 years for non-
EU firms—though this difference should be interpreted cautiously due to sample variations95.
While existing instruments support early-stage R&I, technology development and selected
infrastructure, a critical gap emerges for post grant-funded R&I and prototype development,
when firms need substantial, repeated financing for engineering, qualification, production and
market entry—amid uncertain revenues. EU initiatives of the European Innovation Council
(EIC), InvestEU and EIB Group can help, but do not guarantee a continuous quantum-specific
pathway or adequate coverage of capital-intensive later-stage needs.
Indicative bottom-up estimates suggest that the European quantum sector could require around
EUR 50–60 billion in financing, mainly equity, to support start-up growth, scale-up and major
industrial-capacity investments96.
This imbalance is compounded by the EU’s limited private capital. McKinsey reports that in
2022, government and institutional funding accounted for 19% of global quantum investment,
dropping to 3% in 2025 as private capital dominated. In the EU, however, public funding
continued to represent the majority of inflows, reflecting a shallower private capital pool97.
Corporate investment in EU quantum start-ups also lagged: in 2025, EU firms received
approximately USD 148 million, compared to USD 1 billion for US firms98. This gap is
widened by US public support, such as the 2026 Department of Commerce announcement of
94 Average later-stage venture-capital round sizes increased by 233% between 2024 and 2025, while average
reverse-merger and SPAC round sizes increased by 314%. Capital-market transactions, including IPOs, SPACs
and PIPEs, accounted for 44% of global private quantum investment. None of the public-market transactions
identified among the largest quantum investment transactions of 2025 involved an EU-headquartered company.
EU firms received approximately USD 148 million in corporate investment, compared with around USD 1 billion
for US firms. 95 For more information, see Annex 4. 96 Commission-services bottom-up planning estimate; see Annex 4 for assumptions and limitations. 97 McKinsey & Company, Quantum Technology Monitor 2026: A commercial tipping point, 2026, p. 36. 98 Ibid, p. 39.
22
USD 2 billion in proposed federal incentives for quantum companies99.
Targeted stakeholder consultations highlighted concerns about the accessibility and suitability
of existing financial instruments for capital-intensive quantum firms, including eligibility
conditions, continuity between funding stages and the assessment of projects with long
commercialisation horizon. These findings are presented in detail in Annex 3.
The financing gap may also restrict European investors’ ability to participate in strategically
important transactions. A related industrial-policy concern may therefore arise where a
strategically important European quantum company lacks viable European financing
alternatives and risks relocation or acquisition, potentially reducing Europe’s capacity to
develop and scale critical quantum capabilities100. Foreign investment is not inherently
problematic. Where a transaction is subject to FDI screening, any assessment remains governed
by the applicable Union and national criteria relating to security or public order. These criteria
pursue a distinct objective and do not necessarily address broader industrial-policy concerns,
such as preserving European scale-up capacity or strategically important technological
capabilities where no security or public-order concern arises.
PD4 directly contributes to P2 by limiting firms’ ability to finance industrial teams, production
capacity, qualification, market entry and international expansion within the Union.
2.3.5. PD5 – Weak demand pull and fragmented pathways to first buyers
Early-stage quantum markets face a coordination challenge: suppliers need customers,
operational feedback and reference deployments to refine their products and attract investment.
At the same time potential users hesitate due to uncertain performance, unclear business cases,
integration costs and the risk of backing an immature supplier or technology. This creates a
first-buyer externality: early adopters bear most of the cost and risk, but successful validation
benefits the broader market by generating information, reference value and confidence. As a
result, individual public authorities or companies may rationally delay adoption, even if earlier
purchasing would benefit the wider ecosystem.
Current demand stems mainly from research infrastructures, specialised industrial users and
public purchasers. EU programmes have funded pilots, demonstrators and the first EuroHPC
JU quantum-computing procurements. Moreover, lead demand via procurement has proven
useful to the ecosystem with the procurement of several quantum computers by the EuroHPC
JU. However, there is no systematic Union-wide pathway for successful pilots to progress to
reference deployment and repeat procurement. Stakeholders highlight limited anchor
customers, fragmented procurement and insufficient end-user involvement in technology-
development projects. The mapping of existing quantum procurement schemes and
deployments carried out in support of this IA identified only 12 buyers for quantum-computer
prototypes and 33 for quantum-communication infrastructure101, suggesting a narrow buyer
base rather than a broad first-buyer market.
Since most EU activities are still early-stage and procurement processes are ongoing102, it is
not yet possible to calculate how many EU pilots progress to deployment. This driver is
especially relevant to public authorities and critical-infrastructure operators, which may have
99 U.S. Department of Commerce, “Department of Commerce Announces Letters of Intent With 9 Companies for
$2 Billion to Accelerate U.S. Leadership in Quantum Computing”, 21 May 2026. 100 Regulation (EU) 2019/452 establishing a framework for the screening of FDI into the Union. 101 See Annex 11, section 4. 102 At the analytical cut-off, the six Chips JU quantum pilot lines had only recently entered implementation.
EuroHPC had procured six quantum systems and co-funded two further systems through HPCQS. The evidence
period is therefore too short to calculate a representative pilot-to-repeat-procurement rate.
23
use cases in secure communications, sensing, navigation, healthcare or computing but may lack
the in-house expertise to define requirements, assess offers or compare suppliers using agreed
metrics. SMEs on the user side also struggle due to limited resources for evaluating and
integrating uncertain technologies.
Comparable firm-level data on access to first customers in the EU, US, and China is
unavailable. In the US, Executive Order 14413 aims to coordinate public demand by
prioritising quantum-sensing projects, expanding user facilities, and considering advance
market commitments for a science-enabling quantum computer—though its impact depends on
funding and implementation. Information for China is less available. Thus, while public-
demand mechanisms can be compared, no general conclusion can be drawn about easier
customer acquisition in either market.
PD5 directly contributes to P2. Weak demand limits revenues, reference customers and
investor confidence, while undercapitalised firms reinforce buyer concerns, creating a two-
sided coordination failure that hinders both market formation and scale-up.
2.3.6. PD6 – Incomplete standards, benchmarks and assurance pathways
Buyers and investors need reliable information to compare quantum technologies, assess
performance and security, and determine integration potential. Suppliers, in turn, need common
methods to demonstrate these characteristics. Without agreed terminology, measurement
methods, benchmarks, interoperability profiles and assurance pathways, each transaction
requires additional technical due diligence and bespoke validation.
This creates a dual challenge: information asymmetry and a collective standard-setting
problem. Individual suppliers may push performance metrics that favour their own
technologies, while buyers cannot unilaterally establish benchmarks or interoperability
requirements that the broader market will adopt. Common methods thus require coordination
among suppliers, users, research organisations, metrology bodies and standardisation
organisations.
The CEN/CENELEC quantum standardisation roadmap103 confirms that many international
initiatives are underway, but highlights overlaps and significant gaps. It also notes varying
maturity across quantum domains: early standardisation can support market development in
some areas, while premature standardisation could stifle innovation in others. The issue is
twofold: the absence of comprehensive standards for emerging quantum technologies and the
lack of agreed reference methods and assurance pathways for more mature technologies ready
for procurement and deployment.
A standardisation mapping identified 165 quantum-related items, including published
standards, technical specifications and works in progress. Approximately 70% focused on
quantum communication or PQC, with around 30% being published formal standards102. The
methodology, organisations covered and classification of work in progress are set out in Annex
4. As standards evolve, the interaction between patents and standardisation—including access
to licensing—may become relevant. Fragmented patent portfolios could disadvantage smaller
European actors.
Stakeholder evidence points to practical consequences, such as the need for bespoke test
arrangements, difficulties comparing component data, uncertainty about future security-
evaluation or certification pathways. Several respondents expressed concerns about the
103 CEN/CENELEC JTC 22, Standardization Roadmap on Quantum Technologies, Release 1.1, June 2025; See
also Annex 11, section 3 regarding standardization in Quantum Technologies.
24
maturity and practical applicability of existing specifications particularly for QKD.
The international dimension is also important. Strong EU participation in international
standard-setting can promote interoperability, mutual recognition and the adoption of European
technologies. Stakeholders warn that insufficient European standardisation capacity could
increase reliance on external technologies and standards.
PD6 contributes to P2 by increasing the cost and risk of purchasing, integration and supplier
substitution. It also contributes to P3, as the lack of comparable specifications and qualification
methods can create de facto dependence on incumbent suppliers, even where technical
alternatives exist.
2.3.7. PD7 – Limited visibility and insufficient incentives to mitigate critical
dependencies
Quantum supply chains are technically complex and multi-tiered. System developers may
know their immediate suppliers but often lack visibility into the origin, concentration and
substitutability of sub-components, materials, software and services further upstream.
While the evidence does not confirm a general market failure across the entire quantum
sector—still in its early commercialisation stage—it does highlight a collective information
and coordination gap in strategically relevant supply chains. Limited visibility in this context
refers to insufficient EU-level data on quantum-specific dependencies at component, sub-
component and supplier levels. Available information is fragmented across companies, projects
and programmes, making it difficult to identify shared dependencies or assess concentration,
substitutability and disruption risks across firms and Member States. Firms typically have
information about their direct suppliers, but no single actor has a comprehensive EU-wide view
across supplier tiers, projects and Member States. Additionally, commercially sensitive
information is not routinely shared across firms or with public authorities.
Existing mapping exercises already point to supply gaps and long response times, highlighting
the importance of earlier identification and coordinated mitigation (see Table 2.1)104.
Stakeholder evidence also points to vulnerabilities in areas such as specialised amplifiers,
cryogenics, control electronics, proprietary design tools and cloud services105. Limited
visibility can therefore delay the identification of emerging chokepoints and result in
diversification and supplier qualification taking place only once risks have materialised. It can
also make it more difficult for public authorities to target mitigation, procurement, financing
or international partnerships towards the most material risks. The component mapping and
documented project delays indicate that these gaps are already impacting R&I and early
deployment, even before broad commercial markets emerge.
Key findings (Table 2.2) show that sourcing alternatives are materially weaker at the sub-
component level, and supply issues have already caused notable delays in a small, documented
sample. The selective mapping covers 31 main components and 16 sub-components across five
quantum-computing platforms and shared control systems. Dependency risk is influenced not
only by supplier location but also by concentration, substitutability, lead times, and redesign
or qualification requirements.
104 PPMI/d-fine dependency and resilience mapping for the IA. See Table 2.1, Annex 4 for the underlying evidence,
methodology and limitations and Annex 11 tabs 42, 55, 56 and 67, while also see Annex 7, section 9 on
Dependencies, enabling technologies and resilience”; Annex 8, Table 8.3; and Annex 10, Table 10.3 105 See Annex 2 for more information on the stakeholder consultation.
25
Indicator Evidence Main interpretation
Components and
sub-components
mapped
31 main components and 16
sub-components
Selective mapping of strategically
relevant inputs; not an exhaustive
inventory
Inputs without an
identified EU-based
supplier
9 of 47 mapped inputs,
approximately 19%
Specific gaps were identified in the
selective mapping; this is not an estimate
that 19% of the entire quantum value
chain lacks an EU supplier
Inputs with an
identified alternative
source
87.1% of main components;
50% of sub-components
Sourcing vulnerability is materially
greater at sub-component level
Documented
operational effects
Supply issues associated with
73% of documented extensions;
8 affected projects delayed by
an average of 191 days
Supply constraints already affect
projects, but the sample is too small for
sector-wide extrapolation
Table 2.2. Evidence on sourcing concentration and documented supply-chain effects
in selected quantum-computing inputs. Source: external-support component
and programme mapping conducted for this IA. Coverage, definitions,
supplier-verification methodology and limitations are provided in Annex 4.
A security externality arises when continuity of supply or control over a technology is essential
for the functioning of critical infrastructure, defence, space-related applications or secure
communications. Firms typically assess dependencies based on their own risk assessments,
often overlooking broader consequences like disruption, technology leakage or the loss of a
strategically relevant supplier for other European users.
Existing frameworks address parts of the risk but serve different purposes:
• FDI screening evaluates specified inbound investments and acquisitions but does not
continuously map component-level supply dependencies;
• Dual-use export controls regulate outbound transfers but do not provide early warnings of
third-country supplier restrictions;
• The Critical Raw Materials Act covers certain materials but not manufactured components,
software, or services where many mapped quantum dependencies exist;
• Programme and project reporting offers operational insights but lacks a unified quantum
supply-chain monitoring system.
Stakeholder evidence highlights risks, including delays due to changes in export conditions for
specialised amplifiers, concentration in cryogenic and control-electronics supply, reliance on
proprietary non-EU design tools and cloud services, as well as reduced transparency in supply
conditions after a change in ownership of a European quantum-communication supplier. These
cases illustrate how dependency risks can arise, but do not represent a sector-wide estimate106.
Foreign investment is not inherently a dependency or negative outcome—it can provide
essential capital, commercial networks and industrial expertise. The risk arises when
acquisitions, exclusive investment relationships or transfers of decision-making control reduce
access to strategically important capabilities for European users or create unacceptable security
exposures. Assessments must therefore distinguish between beneficial international investment
and transactions posing concrete economic-security risks.
106 Evidence concerning changes in export conditions, foreign acquisitions and dependencies on specialised
components, proprietary software and cloud services is based on documented stakeholder examples. These cases
are illustrative and should not be interpreted as representative estimates for the quantum sector.
26
PD7 directly contributes to P3. The lack of shared visibility delays identifying chokepoints and
leaves mitigation largely to individual firms and projects. The relevant issue is therefore
resilience and risk-aware diversification, not self-sufficiency or indiscriminate preference for
EU suppliers.
2.4. How likely are the problems to persist?
Under the dynamic baseline described in Section 5.1, the Quantum Europe Strategy, the
expanded EuroHPC JU mandate, the Chips JU pilot lines, EuroQCI, existing financial
instruments and the coordinated PQC roadmap39 are expected to improve parts of the European
quantum ecosystem. However, these measures are at varying implementation stages, and do
not collectively address all structural drivers identified in Section 2.2. Thus, the three core
problems are likely to persist beyond 2030, though their intensity will vary across technologies
and Member States.
P1 – Slow conversion of research excellence into deployable technologies. Quantum
activities under the EuroHPC JU, the quantum-chip pilot lines and existing testing and
deployment infrastructures will increase available capacity. However, as Union, national and
regional programmes will continue to operate under separate planning and funding cycles,
access to fabrication, testing, integration and qualification facilities is likely to remain uneven
across quantum domains and among stakeholders. Given the long development and
qualification cycles involved, discontinuities between research, engineering and deployment
may continue to disperse teams, knowledge and industrial partnerships before technologies
reach maturity107. Although the share of concluded Horizon Europe quantum actions classified
as higher-TRL increased from 21% in 2023 to 45% in 2025, indicating progress towards
validation and deployment, the period remains too short to conclude that the structural
discontinuity between research-to-deployment has been resolved108.
P2 – Insufficient conditions for firms to scale and early markets to develop. Existing
financial instruments and public procurements will continue to support individual firms and
projects but they do not create a continuous pathway from research grants and prototypes to
later-stage finance, reference deployments and repeat procurement. Investors may wait for
customer and revenue evidence, while users may delay adoption until suppliers achieve greater
scale and maturity. Some European firms will grow but the gap between company creation and
industrial scale is unlikely to close by 2030109.
P3 – Strategic dependencies and insufficient resilience. Many of the identified dependencies
relate to specialised materials, components, software and services supplied by a limited number
of providers. Switching to alternative sources may require redesign, qualification and
investment and may therefore not be achievable in the short term. Existing frameworks,
including FDI screening, export controls, critical raw materials, and programme reporting,
address specific risks but they do not provide a continuously updated EU-wide view of
component-level dependencies. As deployment expands across communications, space,
defence and critical infrastructure, the operational consequences of concentrated or hard-to-
replace supply are likely to increase110.
The problems are interconnected: interruptions in industrialisation make firms harder to
finance; weak scale and demand reduce investment in facilities and skills; and a fragmented
107 See Sections 2.1.1 and 2.2, PD1–PD2. 108 See Annex 11, section 1 and 2 for funding programmes, section 2 on the Project development periods and
higher-/lower-TRL classification and section 5on the quantum support infrastructures in the EU. 109 See Sections 2.1.2 and 2.2, PD4–PD5. 110 See Sections 2.1.3 and 2.2, PD7 and Annex 11, section 6.
27
industrial base has less capacity to identify and mitigate dependencies. Existing measures will
generate progress but are unlikely to resolve the underlying research-to-deployment
discontinuities, scale-up and market-formation challenges, or resilience risks within the
assessment period.
If these problems persist, the consequences outlined in Subsection 2.1.4 will continue to
generate lower European industrial value capture, slower uptake of quantum solutions, greater
exposure to supply and security risks, and reduced attractiveness for private capital and
specialised talent. These consequences would remain mutually reinforcing, as weak
deployment reduces revenues and investment, while limited industrial scale constrains the
capacity to diversify suppliers and support users.
3. WHY SHOULD THE EU ACT?
3.1 Legal basis
The initiative’s main objective is to strengthen the competitiveness and resilience of the
Union’s quantum-technology industrial ecosystem.
Article 173(3) TFEU is the main legal basis, as it allows the Union to support Member State
action in pursuing industrial-policy objectives. Measures on strategic coordination, shared
industrialisation capabilities, access to infrastructure, industrial scale-up, ecosystem
development and supply-chain resilience may therefore be based on Article 173(3), provided
that they support or complement Member State action and do not harmonise Member States’
laws or regulations.
Article 114 TFEU may also be used for measures approximating national rules where this is
necessary to prevent or remove concrete obstacles to the cross-border deployment of quantum
products and services or appreciable distortions of competition in the internal market. This
could cover, where justified, common requirements relating to interoperability, conformity
assessment, technical documentation or information obligations. Its use should remain limited
to provisions for which actual or likely internal-market barriers are demonstrated in the
problem definition and impact analysis.
For the initiative assessed in this IA, Article 173(3) TFEU is the main legal basis. Article 114
TFEU should be used only if the final proposal contains clearly separable provisions
approximating national rules to address proven internal-market obstacles or distortions of
competition. Otherwise, the initiative should rely solely on Article 173(3) TFEU.
3.2. Subsidiarity: necessity of EU action
The initiative concerns industrial policy, an area in which the Union may support, coordinate
or supplement Member State action under Article 6(b) TFEU. To the extent that it includes
internal-market measures based on Article 114 TFEU, it would also concern an area of shared
competence under Article 4(2)(a) TFEU. The principle of subsidiarity therefore applies.
The three problems identified in Chapter 2 have a significant cross-border dimension111. As
regards P1, Member States may finance national research programmes and infrastructures, but
national action alone cannot ensure that the European ecosystem reaches critical mass or
provides coherent pathways across research, fabrication, testing, qualification and deployment.
As regards P2, national finance, procurement and business-support measures may assist
individual firms and local ecosystems but cannot in themselves create an integrated European
scale-up and early-market environment. As regards P3, national supply chain monitoring and
111 Evidence supporting the Union-wide and cross-border dimension is set out in Sections 2.1 and 2.2, and Annex
11. See, for example, footnotes 65, 66 and 69, and Section 2.1.3 for the critical component mapping study.
28
mitigation measures, where available, cannot in themselves provide a complete picture of EU-
level exposure or coordinate responses when the relevant capabilities and alternative suppliers
are distributed across the Union.
Member State action therefore remains necessary but is insufficient on its own to address the
scale, cross-border effects and coordination failures identified. Union action is necessary to
complement national measures where objectives require critical mass, shared infrastructure,
cross-border market formation or aggregated supply-chain visibility.
3.3. Subsidiarity: added value of Union action
Union action can add value in four main ways. First, alignment: by aligning Union and national
priorities to focus resources where European scale is required, while allowing Member States
to support areas reflecting their scientific and industrial strengths. Second, economies of scale:
by enabling specialisation and shared access to costly infrastructure (e.g., pilot lines, testbeds),
especially for start-ups, SMEs and users located in Member States lacking such facilities.
Third, market leverage: by coordinating procurement and strengthening links between firms,
users and investors, Union action can create stronger demand and give firms a larger home
market in which to scale, while strengthening the Union’s collective position112. Fourth,
identifying and managing strategic dependencies: by aggregating information across firms,
infrastructures and Member States, Union action can reveal concentration and chokepoints that
would not be visible from a national perspective and facilitate coordinated diversification.
4. OBJECTIVES: WHAT IS TO BE ACHIEVED?
The objectives translate the three problems and seven problem drivers identified in Chapter 2
into the outcomes that the initiative aims to achieve.
4.1. General objectives
The initiative has two mutually reinforcing general objectives:
General Objective 1 (GO-1) – Sustain the Union’s scientific and technological leadership
and strengthen its competitiveness and industrial deployment capacity in quantum
technologies. GO-1 aims to sustain and further develop the Union’s quantum scientific and
technological (S&T) leadership and turn these strengths into manufacturable and deployable
quantum technologies, stronger industrial capabilities, scaled European firms and competitive
products and services in global markets. It requires stronger links across the innovation chain
so that European quantum breakthroughs can mature and be commercialised.
General Objective 2 (GO-2) – Improve EU resilience, trusted and quantum-safe
deployment, and economic security in strategically relevant quantum value chains and
infrastructures. GO-2 aims to improve the conditions for trusted and secure deployment,
reduce exposure to critical dependencies, disruptions and technology leakage, and strengthen
the Union’s capacity to anticipate and mitigate risks affecting strategically relevant quantum
technologies. It includes preparedness for the security implications of quantum technologies,
notably the transition towards quantum-safe solutions where relevant.
Together, these objectives would strengthen the Union’s technological sovereignty in quantum
technologies.
4.2. Specific objectives
The initiative pursues seven specific objectives:
112 European Investment Bank, Investment Report 2025/26: Capitalising on Europe’s strengths, pp. 7 and 254.
29
SO-A – Improve EU-Member State R&I alignment and delivery to sustain S&T
excellence. Establish one coherent EU-Member State quantum R&I programming framework
based on common priorities, with regular alignment and review of relevant Union and national
strategies, programmes, investments and implementation milestones.
SO-B – Reduce lab-to-fab bottlenecks and improve access to shared industrialisation
infrastructures. Improve continuity from research to industrial deployment by developing or
upgrading missing European capabilities, broadening cross-border access to existing
infrastructures, and providing the technical support needed to use them.
SO-C – Improve scale-up conditions through de-risking and financing continuity.
Improve access to suitable financing and continuity between early-stage public support, private
investment and later industrial financing, enabling European quantum firms to enter markets
and scale up in Europe.
SO-D – Strengthen demand pull and support pathways to first buyers and wider
deployment. Increase the involvement of industrial and public users, improve progression
from pilots to reference deployments and repeat procurement, and support early-market
formation where EU-level action adds value.
SO-E – Improve targeted skills and user support for deployment. Increase the availability
and mobility of the industrial, engineering, software, technical, operational, procurement and
user-side skills needed to develop, assess, integrate, operate and adopt quantum technologies.
SO-F – Improve trusted and quantum-safe deployment through standards,
benchmarking, testing and implementation support. Improve the comparability,
interoperability, security and trustworthiness of quantum technologies through common
terminology, measurement methods, performance benchmarks, testing and assurance
approaches suited to technological maturity. Support timely and risk-based implementation of
the existing PQC transition roadmap.
SO-G – Improve visibility, early warning and mitigation of critical dependencies.
Strengthen the Union’s capacity to identify, assess and respond to strategically relevant
dependencies, supplier concentration, chokepoints and related economic-security risks
affecting quantum value chains and deployment, while maintaining open and diversified
international supply relationships.
A description of the baseline of the objectives can be found in Annex 8, Section 4.
5. WHAT ARE THE AVAILABLE POLICY OPTIONS?
This chapter defines the dynamic baseline and presents the policy options for assessment. The
options, derived from the problems, drivers and objectives in Chapters 2 and 4, stakeholder
evidence and a screening of possible policy measures, vary in legal force and implementation
intensity. Detailed measure fiches, analytical assumptions and costs are set out in Annex 4.
5.1.What is the baseline from which the options are assessed?
5.1.1. Scope of the dynamic baseline
The dynamic baseline or business as usual (BAU) projects the evolution of the European
quantum ecosystem without adoption of the Quantum Act, while existing and already planned
Union and Member State legislation, strategies, programmes and measures continue to develop
and be implemented. It therefore includes the foreseeable contribution of horizontal and sector-
specific initiatives relevant to quantum technologies. It includes the foreseeable effects of
30
existing legislation, strategies, programmes and measures113. Additionally, it includes potential
synergies and interactions with enabling and complementary technologies, such as AI. Actions
that emerge from the Quantum Europe Strategy pillars are summarised below, while the further
contribution of the Quantum Act PMs to each of those pillars is listed in Annex 9. Effects
accounted for in the baseline are not double counted as benefits of the policy options.
Actions/initiatives under the Quantum Europe Strategy
• The expanded EuroHPC JU114 (Union-level quantum R&I, development and operation of
quantum infrastructures for computing and simulation, communication, sensing and
metrology activities);
• The Chips Act and the Chips JU115(quantum-chip design, pilot-lines, prototyping, testing
and validation activities);
• The EuroQCI initiative (terrestrial and space components and integration in IRIS2;116);
• Quantum-related activities under Horizon Europe, the Digital Europe Programme, the
Connecting Europe Facility, the European Defence Fund, cohesion-policy instruments
and relevant national programmes (e.g., Quantum Flagship R&I actions, dual-use R&I
and regional support);
• European Quantum Skills Academy, the Quantum Apprenticeship Programme and related
fellowship, mobility, training and talent actions announced in the Quantum Europe
Strategy;
• Financing via the EIC, InvestEU, the EIB Group, national institutions, private investors
and relevant successor instruments117, as well as relevant horizontal initiatives supporting
private investment, including the Savings and Investments Union;
• European and international quantum standardisation and pre-standardisation activities;
Other actions/initiatives
• Relevant recent and forthcoming horizontal and sector-specific initiatives, including the
European Innovation Act, Public Procurement Act, European Research Area Act, EU
Inc. framework, STEP, Chips Act 2.0 and Cloud and AI Development Act (CADA). These
initiatives are expected to improve general framework conditions for innovation and
company scale-up, R&I coordination, public procurement, financing, semiconductor
capabilities and digital infrastructure, while not providing quantum-specific coordination
across the full research-to-deployment pathway.
• The Commission Recommendation and coordinated PQC transition roadmap;
• Member State quantum strategies, programmes, investments and infrastructures;
• Existing Union cybersecurity, critical-entity-resilience, economic-security, foreign-
113 European Commission, Better Regulation Guidelines, SWD (2021) 305 final, 3 November 2021, Chapter 3;
European Commission, Better Regulation Toolbox, 2025, Tool #16, “How to identify policy options”. 114 The EuroHPC amendment is treated as a material improvement to the baseline, but not as evidence that all
Member State programmes, investments and infrastructures are already subject to common planning or review.
This distinction is consistent with the problem analysis in Section 2.1.1 and Annex 4. 115 Chips JU work-programme and implementation documentation. The Chips Act and Chips JU support quantum-
chip design, prototyping, testing and pilot production, but not the full quantum system stack. 116 Regulation (EU) 2021/1153 establishing the Connecting Europe Facility; Regulation (EU) 2023/588
establishing the Union Secure Connectivity Programme; European Commission documentation on the European
Quantum Communication Infrastructure. 117 References to future programmes reflect proposals available at the analytical cut-off and do not prejudge the
outcome of legislative or budgetary negotiations.
31
investment-screening, export control and critical-raw-material frameworks118.
The baseline includes national measures adopted or sufficiently advanced by 19 July 2026. For
example, under its national quantum strategy, France is combining public procurement of
quantum computers with access to hybrid quantum and high-performance computing facilities
for researchers and industrial users through the France Hybrid HPC Quantum Initiative. In the
Netherlands, the Quantum Delta NL programme supports research and innovation, investment
in shared facilities, skills development and support for SMEs. These measures were already
under way at the analytical cut-off and are expected to contribute to the development and use
of quantum technologies in the absence of the Quantum Act.
References to successor programmes or implementing bodies do not presuppose their
establishment, extension of mandate or additional budget needs. References to forthcoming
initiatives likewise do not prejudge their adoption, final design or the outcome of ongoing
legislative or budgetary negotiations. The quantitative baseline includes only measures adopted
or sufficiently advanced by the analytical cut-off date of 19 July 2026, as specified in Annex
9. Initiatives proposed after the analytical cut-off are considered qualitatively for coherence
and additionality but are not included in the quantitative baseline assumptions It also reflects
foreseeable technological progress, private investment, industrial consolidation, procurement
activity and international competitive developments although their timing, scale and
distribution remain uncertain. In particular, horizontal initiatives are expected to improve the
general framework for R&I, innovation, company scale-up, access to finance, public
procurement and digital and semiconductor infrastructure. These developments are
incorporated into the baseline to the extent relevant. However, they do not in themselves
establish quantum-specific mechanisms for aligning Union and national priorities, connecting
activities across the quantum technology stack and research-to-deployment pathway,
coordinating strategic projects and infrastructures, aggregating quantum-specific demand or
monitoring quantum-specific dependencies. The policy options are therefore assessed only
against these residual quantum-specific coordination and delivery gaps.
The additionality of the Quantum Act, as an enabling legislative framework, would lie in the
binding implementation and governance mechanisms it could introduce. The need for
additional measures under the Act does not stem from a lack of Strategy commitments, but
from the fact that these commitments alone do not address fragmentation between the Member
States and the EU programmes. The principal implementation and programming period is
2028-2034 (next MFF). Costs are modelled over 2028-2037 to capture preparatory, start-up
and recurrent implementation costs over a 10-year period. Longer-term effects are assessed
qualitatively or via scenarios where robust forecasting is not possible.
Potential interactions with enabling and complementary technologies
The three domains of quantum technologies (computing, communications and sensing) depend
on common enabling technologies, including photonics, semiconductors, lasers, cryogenics,
control electronics and software. Advances in these technologies, including AI, can benefit
multiple quantum domains.
Developments in semiconductors, photonics and advanced materials can create new
118 Regulation (EU) 2021/695 of 28 April 2021 establishing the Horizon Europe Framework Programme, laying
down its rules for participation and dissemination, and repealing Regulations (EU) No 1290/2013 and (EU)
No 1291/2013; Regulation (EU) 2021/694 of 29 April 2021 establishing the Digital Europe Programme and
repealing Decision (EU) 2015/2240; Regulation (EU) 2021/697 of 29 April 2021 establishing the European
Defence Fund and repealing Regulation (EU) 2018/1092; Regulation (EU) 2021/523 of 24 March 2021
establishing the InvestEU Programme and amending Regulation (EU) 2015/1017.
32
opportunities to strengthen European quantum capabilities, reduce lab-to-fab bottlenecks and
improve competitiveness, but may also create new dependencies or alter the strategic
importance of parts of the quantum value chain. Advances in HPC are particularly relevant, as
quantum computing is expected to operate as part of hybrid quantum-classical computing
architectures, with classical HPC handling tasks such as pre- and post-processing, optimisation
and error correction. Progress in semiconductor fabrication, photonic integration and advanced
materials can improve scalability and manufacturability of quantum devices.
AI and other enabling technological developments are expected to increasingly influence the
development, industrialisation and deployment of quantum technologies119. The relationship is
increasingly bidirectional: quantum and hybrid quantum-classical approaches can contribute to
AI machine learning and optimisation, although a quantum advantage for mainstream AI
workloads has not yet been demonstrated, for example through quantum computing for selected
optimisation, simulation and machine-learning tasks. At the same time, AI can accelerate
quantum development and industrialisation; AI is already used in quantum for circuit
optimisation and quantum error mitigation, the design of novel quantum algorithms, sensor
calibration and signal processing, the optimisation of quantum communication networks, and
quantum-device control.
5.1.2. Expected development and residual gaps
Existing and announced measures will drive some progress. Public investment, infrastructure
deployment and gradual market development are expected to increase R&I activity, early
deployment, specialised employment and demand for quantum-related skills.Recent and
forthcoming horizontal initiatives are also expected to improve the general conditions under
which quantum firms, researchers, investors and public buyers operate. However, these efforts
will not resolve the structural problems identified in Chapter 2 the assessment period.
As national programmes are implemented, more researchers and firms are expected to gain
access to facilities where they can test quantum technologies. National procurement is also
expected to generate initial orders for suppliers and give public buyers experience in specifying
and using quantum systems. The pace and reach of these developments will depend on the
facilities, priorities and procurement timetables of the Member States concerned. Existing
cooperation, including through the EuroHPC Joint Undertaking, can extend the benefits of
individual investments across borders, while decisions on access to nationally funded facilities
and the timing of national purchases will continue to depend on the arrangements for each
programme.
The evidence assessed in Chapters 1 and 2 indicates that significant residual gaps are likely to
remain within the assessment period, as summarised in Table 5.1.
Intervention
dimension
Expected development under the
baseline
Principal residual gap
Strategic
coordination
and delivery
The Quantum Strategy and EuroHPC JU
strengthen Union-level direction and
implementation. By July 2026, 14 Member
States had adopted a quantum-specific
strategy and four were preparing one.
Alignment of Union and national
priorities, investments and
implementation remains
incomplete and uneven. No
horizontal initiative provides an
integrated mechanism for
coordinating quantum priorities,
programmes infrastructures and
deployment pathways across the
119 Quantum Flagship, Artificial Intelligence and Quantum Computing white paper (2025), prepared by AI and
quantum-technology experts.
33
ecosystem.
Research,
industrialisation
and
infrastructure
At the analytical cut-off date,
implementation arrangements differed
across quantum domains (computing,
communication, sensing). The baseline
reflects the expected implementation of the
expanded EuroHPC JU mandate120 without
assuming that all existing EU projects or
infrastructures will be transferred to the JU.
Chips Act 2.0 and CADA are expected to
strengthen relevant semiconductor and
digital infrastructure capabilities.
Access conditions, capacity,
technical support and links
between research projects and
industrialisation facilities remain
unclear and uneven. Residual gaps
concern in particular the
connection of full quantum
systems, non-semiconductor
enabling technologies and cross-
domain testing with industrial
validation and deployment.
Scale-up
finance
EIC, InvestEU, the EIB Group, potential
future EU support programmes and
national instruments continue to support
firms and consortia. STEP, EU Inc. and
other horizontal initiatives are expected to
improve general financing, visibility and
company scale-up conditions.
Technical and financial continuity
remains weak between grants,
validation, later-stage finance,
private co-investment and
deployment revenue. Horizontal
instruments do not specifically
address the capital intensity, long
development cycles and
specialized infrastructure needs of
quantum firms.
Demand and
first buyers
Union and national procurement and
deployment initiatives continue, including
EuroHPC JU and EuroQCI-related actions.
The European Innovation Act and Public
Procurement Act are expected to improve
the horizontal framework for innovation
procurement and public purchasing.
Demand remains concentrated
among a relatively narrow buyer
base, while progression from
pilots to reference deployment and
repeat procurement remains
limited and uneven. The
horizontal frameworks do not
themselves identify or coordinate
quantum-specific strategic
demand or connect technology
validation systematically with first
buyer and reference deployment
opportunities.
Skills and user
capabilities
Existing education, training and mobility
initiatives continue. Europe has a strong
scientific base and around 40 specialised
quantum master’s programmes121.
Horizontal R&I and mobility initiatives are
expected to improve general conditions for
researchers and knowledge circulation.
Training remains insufficiently
connected to industrial
engineering, systems integration,
deployment, procurement and
user-side needs.
Standards and
trusted
deployment
European and international standardisation
activities, benchmarks and PQC
implementation continue to develop.
Existing cybersecurity and standardisation
frameworks continue to provide the
horizontal structures for cybersecurity
requirements, certifications and formal
standard-setting.
Standards, benchmarks, testing
and assurance remain unevenly
connected to procurement and
deployment, while
implementation readiness and
PQC migration progress vary
across Member States and critical
sectors39.
120 The expanded mandate covers the Union’s Horizon Europe quantum-technology activities. 121 Quantum Flagship, Strategic Research and Industry Agenda 2030, 2024 (SRIA), section 2.3. The Agenda
identified around 40 specialised master’s programmes in quantum technologies or quantum engineering in Europe
and concluded that expected graduate output would remain insufficient for anticipated industrial needs.
34
Dependencies
and resilience
FDI screening, export controls, project
monitoring and other horizontal
frameworks including the Economic
Security Strategy continue to address
individual risks and transactions. Existing
Union and Member State quantum-related
international partnerships and dialogues
also continue. The Chips Act 2.0
framework and other horizontal resilience
initiatives are expected to address relevant
semiconductor, raw-material and
economic- security risks within their
respective scopes.
Visibility of strategically relevant
dependencies remains incomplete,
and identified supply-chain risks
are not consistently translated into
timely and proportionate
mitigation122. In particular, no
existing horizontal framework
provides systematic quantum
specific visibility across
specialized components,
equipment, software and services
throughout the wider quantum
value chain.
Table 5.1. Dynamic baseline and residual gaps. Source: Commission services, based on the Quantum
Europe Strategy and PPMI/d-fine mappings of Member State strategies, infrastructures, finance,
procurement, standardisation and critical components.
Definitions, coverage and limitations are provided in Annexes 4, 5, 8 and 9123.
In summary, progress is expected to remain gradual, uneven and insufficient to address the
identified structural problems within the assessment period, notably: (i) discontinuities
between research and deployment, (ii) insufficient conditions for firm scale-up and early
market development, and (iii) strategic dependencies with insufficient resilience. The baseline
therefore does not assume that horizontal initiatives have no effect; rather, it incorporates their
expected contribution and isolates the quantum-specific gaps that remain. This ensures that
only effects additional to the baseline are attributed to the policy options. The detailed
assumptions underpinning the baseline scenario, together with the impacts of the policy
options, are set out in Annexes 3, 4 and 8, and Chapter 6.
5.2. Description of the policy options
5.2.1. Construction and overview of the options
The residual gaps (Table 5.1) were used to screen potential policy measures for their
effectiveness, EU added value, legal and operational feasibility, proportionality, coherence
with existing instruments, and administrative and budgetary implications. The selected
measures were then grouped into three policy options differing mainly in legal force, coverage
and delivery intensity. To address the problems identified, there are three key intervention
areas: (i) sustaining and advancing Europe’s quantum R&I excellence; (ii) accelerating
industrialisation and deployment of quantum technologies and solutions; and (iii)
strengthening security and resilience of quantum supply chains, including by monitoring
and mitigating critical dependencies.
122 Alternative EU-based suppliers were identified for 27 of 31 main-component categories and 8 of 16 sub-
component categories. This does not establish technical interchangeability, sufficient capacity or rapid
substitutability. See Annex 11, tabs 66–74. 123 The residual gaps are expressed in functional terms and do not imply a particular instrument, governance model
or policy option; alternative approaches to addressing them are assessed in Section 5.2.
35
All three policy options address the same intervention
areas but differ in legal force, coverage and delivery
intensity. PO1 relies on voluntary coordination and
market facilitation; PO2 introduces structured
governance and delivery arrangements with targeted
obligations; and PO3 retains the PO2 architecture while
applying higher-intensity variants in selected areas.
Detailed design principles and safeguards for each of
these three policy options are set out in Annex 4.
The options follow the technology lifecycle approach
introduced by the Quantum Europe Strategy, covering the
progression from research, engineering and validation to
industrial scale-up, market deployment and resilient
operation, with measures able to operate in parallel. All
options build on the dynamic baseline, use existing Union
bodies and instruments where possible, and are designed
to be technology-neutral and proportionate to
technological maturity. Table 5.2 summarises the
intervention logic of each option.
Scenario /
policy
option
Intervention logic Main content
PO1 –
Voluntary
horizontal
framework
Non-legislative, ecosystem-
wide and market-enabling
approach based on
voluntary participation of
Member States and other
involved stakeholders.
Voluntary cooperation across the three
intervention areas: R&I excellence;
industrialisation, scale-up, deployment and
demand; and security and resilience of quantum
value chains. PO1 would not create new legal
obligations, formal designations, reserved
finance or mandatory reporting.
PO2 –
Enabling
Quantum
Framework
Act
Enabling legislative
framework establishing
structured EU-Member
State governance and
delivery arrangements,
while relying mainly on
existing implementing
bodies.
A Regulation would establish structured
arrangements across the three intervention areas.
Obligations would fall mainly on the
Commission, Member States and designated or
Union-supported actors, while participation by
other firms and users would generally remain
voluntary. It would create neither a new Union
agency nor an automatic entitlement to funding.
PO3 – High-
intensity
targeted
framework
PO2 architecture combined
with stronger, binding
variants in a limited number
of areas where greater
implementation certainty
may be necessary.
PO3 would retain the PO2 governance and
delivery framework and apply higher-intensity
variants to selected measures across the three
intervention areas. All other measures would
operate as under PO2.
Table 5.2. Overview of the policy options.
5.2.2. Policy measures and their configuration across the options
For each of the three main intervention areas outlined above, detailed policy measures have
been developed. The 16 policy-measures (PMs) retained for the construction of the policy
options are described below. They were retained because they address the identified problem
drivers and passed an initial screening of Union added value, legal and operational feasibility,
proportionality, coherence and administrative and budgetary implications.
Figure 5.1. Indicative lifecycle and
interaction of the Quantum Act
policy measures.
36
Discarded alternatives are summarised in Section 5.3. The full screening and detailed measure
fiches are set out in Annexes 4 and 8.
Intervention area 1: Sustaining and advancing Europe’s quantum R&I excellence
PM1: Common programming framework PO1. PM1a. Provides a voluntary exchange of information on EU and Member State
programmes, and voluntary alignment on common priorities, reinforcing coordination
compared with the dynamic baseline.
PO2. PM1b. Provides a common EU-Member State framework for developing a shared
quantum strategy and aligning EU and national programmes around agreed priorities,
identified gaps and coordinated implementation timelines. Funding and budgetary decisions
would remain with the competent EU and national authorities.
PO3. PM1csame as PM1b.
The Common Programming Framework would be coordinated by the Commission, in
consultation with the Quantum Strategy Board (see PM15 below). Its research goals would be
implemented through PhDs and post-doctorates in the fields established in the Programme.
PM2: Quantum Science and Technology (S&T) Excellence Network
PO1. PM2a: Strengthens links across the Quantum Flagship community and European
Research Area networks by establishing a voluntary network of quantum labs across Europe
that would promote cooperation, including by working on commonly agreed major quantum
S&T challenges.
PO2. PM2b: Statutory establishment of a distributed European network of leading and
emerging quantum labs, universities, and RTOs to cooperate on commonly agreed S&T
challenges, researcher mobility and access to relevant capabilities.
PO3. PM2c same as PM2b.
Under PO2 and PO3, the network would be open, dynamic and based on excellence, rather
than a closed club composed of a fixed set of quantum science labs. Participation would be
based on an open call for proposals, within the common programming framework (PM1).
Selection would be carried out based on transparent criteria covering scientific excellence and
relevant capabilities. Appropriate membership modalities will be designed to ensure
participation of the best entities. The network would consist of already existing labs,
universities, RTOs and infrastructures. The network would provide light coordination between
leading centres for quantum, notably under the umbrella of the Common Programming
Framework (PM1). Among the advantages of the network would be cooperation around
common S&T challenges or facilitating researcher and PhD mobility.
PM3: Quantum Grand Challenges
PO1. PM3a: Voluntary mapping and alignment on grand challenges, which address
ambitious objectives for accelerating quantum technology development and system
engineering. They would be identified through appropriate stakeholder consultation (e.g.
through the European Quantum Alliance – see PM16).
PO2. PM3b: As in PM3a, grand challenges would be identified through stakeholder
consultations, and cooperation with Member States (e.g., the Quantum Strategy Board – see
PM15). They would then be selected competitively on predefined proposal evaluation criteria.
PO3. PM3c same as PM3b.
A list of potential Grand Challenges would be identified by the Commission, taking into
consideration key technological and engineering bottlenecks, available technology roadmaps,
stakeholder evidence and international developments. The candidate Grand Challenges would
be assessed through a defined procedure, in consultation with the Quantum Strategy Board (see
PM15) and the Quantum Alliance (see PM16). The final decision on which Grand Challenge
to launch would remain with the Commission. The Governing Board of EuroHPC JU (or its
37
successor) would take the relevant financing decisions, and the challenges would be
implemented through the EuroHPC JU. Implementation would take place through open and
competitive calls under the applicable programme. Each Grand Challenge would have a clearly
measurable objective, milestones and stage gates. Independent expert review under the
applicable programme procedures would assess progress against the predefined milestones and
stage gates and provide recommendations on continuation, redirection or termination124.
Successful Grand Challenges could potentially be followed up by becoming a Strategic Project
(PM5).
Intervention area 2: Accelerating industrialisation and deployment of quantum technologies
and solutions
PM4: Technology and Innovation Hubs PO1. PM4a.Voluntary creation of a limited number of specialised Technology and
Innovation Hubs. They would focus on start-ups and SMEs, bringing together the expertise,
services and infrastructure needed for accelerating their technological development. They
would also provide access to infrastructure and test and experimentation facilities.
PO2. PM4b. Statutory designation of a limited number of specialised hubs as described in
PM4a. Existing facilities would be used first.
PO3. PM4c same as PM4b.
Under PO2 and PO3, a limited number of specialised Quantum Technology and Innovation
Hubs would provide engineering expertise, testing, validation, qualification and access to
specialised infrastructures, particularly for start-ups and SMEs. Existing facilities, capacities
and structures would be used first, avoiding unnecessary duplication.
PM5: Strategic Quantum Infrastructures and Strategic Quantum Projects
PM5.1 – Strategic Quantum Infrastructures
PO1. PM5.1a. Supporting, on a voluntary basis, the development of existing or new large-
scale Strategic Infrastructures to validate quantum technologies at European scale before wider
deployment. Examples include the European Quantum Communication Infrastructure
(EuroQCI) for quantum secure communications, quantum-enhanced medical imaging, a full-
scale European quantum computer, the quantum internet or quantum sensing and gravimetry.
PO2. PM5.1b. A statutory Union framework for identifying and coordinating Strategic
Quantum Infrastructures, including the continued development of existing infrastructures and,
where justified, new infrastructures, based on Union added value, cross-border relevance,
technological maturity and deployment needs. Funding, procurement and access arrangements
would remain under the relevant programmes and competent bodies.
PO3. PM5.1c same as PM5.1b.
PM5.2 –Strategic Quantum Projects
PO1. PM5.2a. Voluntary identification and coordination of major industrial projects of
European relevance, such as quantum foundries, or other strategic industrial capabilities.
PO2. PM5.2b. The Commission would designate Strategic Quantum Projects through an
open process based on predefined criteria, including Union added value, cross-border
relevance, strategic importance and implementation maturity, with input from the Quantum
Strategy Board (see PM15). Designation would not automatically confer funding or State aid
approval.
PO3. PM5.2c same as PM5.2b.
Strategic Quantum Infrastructures would support the development, testing, validation,
demonstration and deployment of quantum technologies. Existing infrastructures could be
developed or expanded, while new infrastructures would be supported where justified by
124 At an early stage, PM3 may support several credible pathways in parallel where this is justified by uncertainty
and the strategic value of alternative solutions. One possible implementation route under PM3 is pre-commercial
procurement, using phased development with predefined technological targets and milestones per phase.
38
strategic relevance, identified needs and Union added value, including cross-border use.
For Strategic Projects, the added value of designation as such could include Union-level
recognition helping projects access relevant Union and national funding instruments. Priorities
would be set based on clear criteria125, developed with advice from the Quantum Strategy
Board (see PM15 below), and where appropriate, followed by calls for expressions of interest.
Technology pathways for such projects will be assessed against transparent criteria, including
expected impact, scientific and technical merit, scalability, time-to-deployment, cost-
effectiveness, and contribution to EU policy objectives. The Projects would have a staged,
technology-neutral approach to avoid technological lock-in and ensure an optimal choice
among competing technologies.
PM6: Competence and Acceleration Centres
PO1. PM6a. A network of distributed voluntary Competence and Acceleration Centres
across the Member States that would provide a first entry point to quantum technologies and
promote quantum deployment. These centres would support start-ups, SMEs, public authorities
and other users in identifying relevant use cases and obtaining initial technical and business
support as well as referrals to Technology and Innovation Hubs. They would help reduce
quantum adoption barriers without duplicating the specialised engineering role of the Hubs.
PO2. PM6b. The centres, as described in PM6a, would be created with the aim to fulfil a
formal role within the support ecosystem. They would ensure the creation of at least one first-
level access point (Centre) in each Member State, which may be established nationally or
through a joint cross-border arrangement. Centres may be supported under the relevant
programmes subject to the applicable funding decisions.
PO3. PM6c same as PM6b.
Under PO2 and PO3, Member States would ensure at least one locally accessible first-level
Quantum Competence and Acceleration Centre in each Member State, established nationally
or jointly with other countries. Building primarily on existing structures, these Centres would
help companies and other users identify quantum applications, access technical and business
advice, and obtain referrals to relevant infrastructures, specialised Hubs, skills, financing and
procurement opportunities.
PM7: Innovation Procurement
PO1. PM7a. Provide a structured pathway from concept to market, helping public buyers
identify promising solutions and prepare for possible future procurement. It would provide for
voluntary buyer groups, market consultations, supplier-user matchmaking, model procurement
documents and technical guidance.
PO2. PM7b. The Commission and the Member States126 would coordinate pre-commercial
procurement (PCP), public procurement of innovative (PPI) solutions and reference
deployments based on common use cases and functional specifications. The measure would
strengthen buyer capacity and support progression from experimentation to operational
deployment and repeat demand. Procurement decisions would remain with the competent
contracting authorities.
PO3. PM7c. PM7b measures combined with common eligibility or sourcing conditions in
predefined strategic procurement categories. These would apply where justified by reasons of
security of supply, with market-availability tests, proportionate exceptions, trusted-partner
participation and compliance with Union and international procurement rules.
125 Selection criteria may include, but is not limited to, strategic relevance for Europe, the need for upstream S&T
advances, potential impact across the quantum ecosystem, European added value, feasibility and structuring
effects. 126 And tentatively international partners, with the appropriate safeguards and reciprocity, pending political steer
at the QSB (see PM15).
39
PM8: Standards and benchmarking
PO1. PM8a. Support for pre-standardisation, measurement, benchmarking and voluntary
technical cooperation.
PO2. PM8b. As in PM8a but with financial support to achieve common terminology,
measurement methods, performance benchmarks, interoperability profiles and testing
procedures.
PO3. PM8c. Same as PM8b.
The Commission would support pre-standardisation, measurement, benchmarking,
interoperability and testing activities, building on existing European and international bodies.
Formal standards would remain within the recognised European standardisation system.
Testing approaches would be introduced only where the technology and assessment methods
are sufficiently mature127. The European Quantum Alliance (PM16) would contribute to
identifying and regularly updating European industry priorities.
PM9: Skills and mobility
PO1. PM9a. Voluntary mapping and exchange on skills needs, training offers, mobility and
user-support services.
PO2. PM9b. Coordinated skills intelligence, training, mobility and reskilling activities
linked to the common programming framework, infrastructures, Hubs, Grand Challenges,
Strategic Projects and existing Quantum Skills Academy. Building on existing frameworks and
initiatives, this would allow to address demonstrated skills shortages, while respecting Member
States’ responsibility for education policy.
PO3. PM9c same as PM9b.
The Commission would identify and address skills shortages through Union-level action, in
cooperation with Member States and relevant stakeholders. This could cover training, mobility,
skilling and reskilling, supported by relevant Union and national programmes, to strengthen
the availability and mobility of the industrial, engineering, technical, operational, procurement
and user-side skills needed for the development, assessment, integration, operation and uptake
of quantum technologies.
Intervention Area 3: Strengthening security and resilience of quantum supply chains,
including by monitoring and mitigating critical dependencies
PM10: Quantum Investment Service Desk
PO1. PM10a. Voluntary investment-readiness guidance and referrals to existing Union,
national and private financing instruments.
PO2. PM10b. A Commission-coordinated service desk to help quantum firms and consortia
access relevant Union, national and private financing by providing them with advice on existing
investment opportunities, connecting them with suitable investors and financial instruments and
supporting co-investment. In justified cases, it could facilitate coordination among relevant
public and private financing actors where acquisition, relocation or loss of control could
materially affect access to a strategically important quantum capability. It would not entail a
new financial institution, and investment decisions would remain with the competent financial
bodies.
PO3. PM10c. Retains PM10b and adds a dedicated quantum investment mandate or capacity
within existing or future Union or national financial instruments, providing greater risk-bearing
and rapid-response support for scale-up and strategic capabilities.
Under PO2, the Quantum Investment Service Desk would provide targeted advice and
127 Sufficient maturity would not necessarily require full technological or market maturity. It would rather mean
that results are sufficiently stable, consistent and reproducible, including across laboratories, and linked to
recognised references or standards. The Commission would assess maturity of an area, drawing on independent
technical expertise where needed.
40
investment-readiness support to quantum firms, particularly start-ups and SMEs, facilitating
access to existing Union, national and private financing opportunities. It would build on
relevant existing advisory structures and would not assess individual investments or take
financing decisions, which would remain the responsibility of competent financing institutions.
The higher-intensity investment-capacity variant is assessed separately under PM10c (PO3).
PM11: Strategic intelligence and dependency monitoring
PO1. PM11a. Collection of information on European quantum supply chains based on public
information, and information, which is supplied on a voluntary basis.
PO2. PM11b. Commission to establish a mapping, monitoring and early warning system
involving the Member States via the Quantum Strategy Board (see PM15), to identify critical
quantum components, suppliers, concentration, substitutability and disruption risks. Identified
risks would be referred to existing finance, procurement, supplier-qualification, diversification
and economic-security instruments.
PO3. PM11c. PM11b mapping combined with default mandatory information requests for
designated projects, infrastructure operators and actors in predefined critical value-chain
categories. Identified risks would be referred to existing finance, procurement, supplier-
qualification, diversification and economic-security instruments.
Under PO2, the Commission would monitor strategic dependencies across quantum supply
chains, including critical components, supplier concentration, technological bottlenecks and
disruption risks, in cooperation with Member States and the Quantum Strategy Board (see
PM15). Existing information would be reused wherever possible, with additional information
requested only where necessary and proportionate, subject to appropriate confidentiality
safeguards. PO3 would provide for more extensive mandatory information requirements for
defined critical categories.
PM12: Quantum Business Platform
PO1. PM12a. Voluntary participation in a light-touch platform providing company
visibility, ad hoc matchmaking and information on capabilities and needs.
PO2. PM12b. An EU-supported platform bringing together quantum companies, users,
investors and public buyers for matchmaking, market intelligence and visibility of
capabilities, needs and partnership opportunities. Participation in the platform will remain
voluntary.
PO3. PM12c same as PM12b.
The operation of the Quantum Business Platform could be contracted to an external or
ecosystem operator. Information would be reused where lawful and appropriate, while
respecting confidentiality and applicable safeguards. The Platform should connect directly with
the Competence and Acceleration Centres and the Quantum Investment Service Desk. The
Platform may share non-sensitive data and technical infrastructure with PM11 (Strategic
Monitoring) but should remain functionally distinct: participation in the Business Platform is
voluntary and market-facing, whereas strategic-intelligence information may be commercially
sensitive and, in limited justified cases, subject to proportionate information requests.
PM13: Quantum-safe preparedness
PO1. PM13a. No additional measure beyond the dynamic baseline.
PO2. PM13b. Structured cooperation on PQC between the Commission, Member States and
relevant bodies (e.g. the Quantum Strategy Board (see PM15), the NIS Cooperation Group and
the European Cybersecurity Certification Group), to coordinate the implementation of the PQC
roadmap39, and monitor its progress.
PO3. PM13c. Make binding the implementation of the PQC roadmap through time-bound
migration requirements.
Implementation would build on the existing EU PQC roadmap and cybersecurity governance.
Under PO2, the Commission would facilitate regular cooperation with Member States and
41
relevant Union bodies to monitor implementation, exchange technical guidance and identify
bottlenecks, without introducing additional migration deadlines or certification obligations.
Under PO3, time-bound requirements would apply to the defined addressees in accordance
with the scope established by the initiative and existing Union cybersecurity legislation.
PM14: Strategic international cooperation
PO1. PM14a. Existing partnerships and dialogues would continue, supported by voluntary
coordination and information exchange.
PO2. PM14b. Through the Quantum Strategy Board (see PM15), coordination of trusted and
reciprocal cooperation with third countries covering research, standards, skills,
reciprocal infrastructure and market access, use cases and supply diversification.
PO3. PM14c same as PM14b.
To be implemented by Commission, with advice from the Quantum Strategy Board (see
PM15). They may discuss international cooperation on quantum technologies, reducing
dependencies, knowledge and skills shortages, and which international partners should be
prioritised for strategic partnerships on quantum technologies.
PM15: Quantum Strategy Board
PO1. PM15a: Advisory group bringing together the Commission, Member States and
relevant national implementing bodies. It will strengthen the informal EU-Member State
coordination of the dynamic baseline, while participation, exchange of information and
alignment would remain voluntary.
PO2. PM15b: A high-level advisory body comprising the Commission and the Member
States as a permanent coordination platform. It would support coordination of Union and
national quantum strategies, facilitate agreement on common priorities, monitor
implementation and identify investment, infrastructure and capability gaps.
PO3. PM15csame as PM15b.
Under PM15b, PM15c, the Board would be composed of high-level representatives from all
Member States and chaired by a representative from the Commission. The Board would be
able to establish other standing or temporary sub-groups for specific topics. Examples include:
a group on standards, or a group on skills.
PM16: European Quantum Alliance
PO1. PM16a: Voluntary stakeholder platform bringing together industry, start-ups, research
organisations, RTOs, users, investors and standards communities. It would provide evidence
and implementation feedback, and structured stakeholder inputs as compared to the informal
research and industry networks of the dynamic baseline.
PO2. PM16b same as PM16a, with the Alliance being formally established and linked to the
Quantum Strategy Board for the functions detailed in PM16a.
PO3. PM16c same as PM16b.
The Commission would appoint members of the European Quantum Alliance, which should
represent the industry across the quantum value and supply chain in the Union. There will be
specific criteria for such selection. A representative of the Commission would chair the
Alliance. The Alliance would be in regular dialogue with the Quantum Strategy Board and may
establish standing or temporary working groups for specific matters – always subject to
approval of the Chair.
Figure 5.2 below illustrates the logic and relationship between different PMs and shows how
they contribute to the process from research to the adoption of quantum technologies. Detailed
descriptions of the PMs can be found in section 4.1.9 of Annex 4.
42
Figure 5.2. Relations between PMs, intervention areas, and research-adoption process.
The different PMs are designed as connected following the full quantum technology lifecycle
approach (cf. section 5.2.1), from early-stage research to market uptake. However, this is not
an automatic linear chain: measures may operate in parallel and participation in one instrument
does not confer entitlement to another.
All the measures have been designed to be complementary and to address needs across the
quantum supply chain, thereby creating strong synergies between them. For example, a
quantum scale-up facing technical and engineering bottlenecks could seek support from a
specialised Innovation Hub (PM4); for market deployment and access to end users, from a
Competence and Acceleration Centre (PM6); and where looking for financing possibilities,
from the Investment Service Desk (PM10), which would orient it to existing Union, national
or private funding.
Another key synergy is around the innovation chain. Grand Challenges (PM3) support
upstream research and engineering to overcome major quantum technological bottlenecks.
Strategic Quantum Infrastructures and Projects (PM5) help bring the most promising results
towards validation, scale-up and deployment, through strategic pilot infrastructures (that
validate technologies in operational environments, for example Q-MRI128) and Strategic
quantum Projects that would address more mature industrialisation and deployment needs of
European relevance. Innovation Procurement (PM7) supports downstream market uptake by
using innovation procurement to create lead markets, provide an initial customer base and
accelerate the adoption of quantum solutions. For example, a Q-MRI solution validated under
PM5 could later be deployed through PM7 using the innovation procurement instrument for its
first operational deployment. In this way, results from PM3 can feed into PM5, and outputs
from PM5 can be taken up under PM7, creating a virtuous feedback loop from frontier research
128 Q-MRI (Quantum Magnetic Resonance Imaging) refers to quantum-enhanced medical imaging using quantum
sensors to measure magnetic signals at molecular level.
43
to strategic implementation.
Stakeholders broadly supported stronger coordination, improved access to cross-border
infrastructure, continuity of financing, first-buyer support, skills development and standards.
The Top-Level Specialists in the Quantum Technologies group129 endorsed an integrated
pathway combining scientific cooperation, specialised Innovation Hubs, distributed user-
access points, Grand Challenges and stronger first-buyer mechanisms. It also stressed that
SMEs should not be required to form consortia or disclose commercially sensitive information
unless strictly necessary. Views were more divided on the creation of new institutional
structures, dedicated financial capacity, binding reporting requirements and broader
procurement preferences. These views informed both the design of the options and the
alternatives screened out in Section 5.3130.
The following subsections summarise each option. They do not introduce additional measures;
the detailed configuration of each PM under PO1-PO3 is set out above.
5.2.3. Policy Option 1 - Voluntary horizontal framework
PO1 would be a voluntary horizontal, market-enabling approach to improve the framework
conditions for the quantum ecosystem through coordination, shared information, common
tools, skills, infrastructure access and standards support, as well as improved use of existing
Union and national instruments. It avoids mandatory requirements and does not set up
systematic structures; so its effectiveness would depend on participation by Member States,
implementing bodies and stakeholders.
(i) Sustaining and advancing Europe’s quantum R&I excellence. PO1 would establish an
informal but regular Commission-Member State dialogue (PM1a), and a voluntary European
Quantum S&T Excellence Network (PM2a). These arrangements would facilitate bringing
together all relevant public and private stakeholders to exchange on priorities, identify
complementarities and define non-binding roadmaps. However, participation and follow-up
would remain voluntary, and no new common funding or implementation commitment would
be created131.
(ii) Accelerating industrialisation and deployment of quantum technologies and solutions.
PO1 would establish voluntary structures that would connect companies, facilities, investors,
financial institutions, public buyers and potential users. All funding, investment, procurement
and expenditure decisions would remain with the competent bodies. A skills-intelligence
function (PM9a), building on existing Union and national skills initiatives, would map
emerging industrial and user needs, relevant curricula, training offers and mobility actions. Pre-
standardisation research, measurement methods, performance benchmarks and interoperability
profiles would be supported where technological maturity permitted (PM8a).
(iii) Strengthening security and resilience of quantum supply chains, including by
monitoring and mitigating critical dependencies. Under PO1, the Commission would collect
and analyse publicly available and voluntarily supplied information to create and maintain an
overview of European quantum supply chains and their dependencies (PM11a). A voluntary
Quantum Business Platform (PM12a) would provide visibility and matchmaking along the
129 Draft Second Report on Quantum Act Priorities, July 2026, produced by the Top-Level Specialists in Quantum
Technologies Commission expert group. 130 See Annex 2, Stakeholder Consultation Synopsis Report. Consultation evidence was used to assess the
problems, feasibility and proportionality of alternative designs and was not treated as an opinion poll. 131 Strategic Research and Industry Agenda 2030, 2024 (SRIA). The existing Union implementation framework
and expected benefits are part of the baseline. The SRIA identifies the need for coordination between research,
industrial roadmaps and shared infrastructure, including links to the Chips Act.
44
value chain and would remain separate from regulatory reporting or funding eligibility.
International cooperation (PM14a) would continue through existing partnerships and
dialogues. Investor coordination would be supported through voluntary pipeline meetings and
referrals among Union, national and private actors (PM10a). Public buyer coordination would
be improved through market consultation, training, matchmaking and common model
procurement documents. Neither arrangement would reserve funding or bind investment or
procurement decisions.
Delivery characteristics and limitations. PO1 could be implemented via recommendations and
communications, work programmes, and voluntary cooperation, without creating binding
participation, designation, funding or reporting obligations.
5.2.4. Policy Option 2 - Enabling Quantum Framework Act
PO2 would introduce an enabling legislative framework to address coordination,
industrialisation, scale-up, deployment and resilience gaps. It would legally anchor a common
EU-Member State approach, linking existing Union and national instruments into a continuous
pathway from research to industrialisation and deployment. Requirements would primarily
apply to the Commission, Member States and designated or Union-supported actors, while
participation for private actors would remain voluntary.
(i) Sustaining and advancing Europe’s quantum R&I excellence. PO2 would establish a
common EU-Member State quantum programme with agreed Union priorities and
proportionate national quantum chapters (PM1b). PO2 would formally establish a distributed
European Quantum S&T Excellence Network (PM2b) and a portfolio of competitively
selected, Quantum Grand Challenges (PM3b).
(ii) Accelerating industrialisation and deployment of quantum technologies and solutions.
PO2 would designate a limited number of Technology and Innovation Hubs (PM4b), establish
a network of Competence and Acceleration Centres (PM6b) and provide a statutory framework
for identifying and coordinating Strategic Quantum Infrastructures (PM5.1b) and a procedure
for designating Strategic Quantum Projects (PM5.2b). Together with the PMs in (i), these
arrangements would provide support to and connect scientific cooperation, engineering,
testing, user support and large cross-border projects using existing capacity first. Designation
would not guarantee funding, State aid approval, regulatory exemptions or priority access132.
PO2 would also coordinate public buyers around common use cases, pre-commercial
procurement, public procurement of innovative solutions and reference deployments (PM7b).
Procurement decisions would remain with the contracting authorities. It would support
common terminology, measurement methods, benchmarks, interoperability profiles and shared
testing references, while formal standards would continue to be developed through the
recognised standardisation system (PM8b). It would also provide technical advice and
implementation support for the PQC roadmap without creating additional migration deadlines
or certification obligations. PO2 would connect skills intelligence, training, mobility and user
support (PM9b) with infrastructures, Grand Challenges, Strategic Projects and procurement
activities133.
(iii) Strengthening security and resilience of quantum supply chains, including by
monitoring and mitigating critical dependencies. A high-level Quantum Strategy Board
(PM15b) would set common priorities, monitor implementation and identify investment,
132 See Annex 4.1.8-4.1.9, fiches PM2–PM6, for the detailed functions, selection criteria, access arrangements and
safeguards. 133 See Annex 4.1.8-4.1.9., fiches PM8 and PM9 for more information.
45
infrastructure and capability gaps – unlike in PO1, it would constitute a mandatory cooperation
framework. A European Quantum Alliance (PM16b) would provide structured advice from
stakeholders, including investors. PO2 would also establish structured cooperation on PQC
between the Commission, the Member States and relevant bodies, through Commission-
facilitated regular exchanges to coordinate implementation and monitor progress under the
existing PQC roadmap (PM13b).
PO2 would also establish a Quantum Investment Service Desk (PM10) to address the
fragmented financing pathway between grants, scale-up and deployment. It would provide
advice to stakeholders for access to finance and connect them with the EIC, InvestEU, the
Scaleup Europe Fund, the envisaged Strategic Technologies for Europe Facility (STEF)134, the
EIB Group’s financial instruments, national financial institutions and private investors. Lastly,
PO2 would also introduce risk-based mapping and early warning for critical quantum
components, suppliers and value-chain categories (PM11b), using existing information first
and requesting additional information only where necessary and proportionate, subject to
confidentiality, data minimisation, secure handling and once-only reuse135. Identified risks
would be referred to existing finance, procurement, supplier-diversification and economic-
security instruments. The Commission and Member States would coordinate cooperation with
relevant third countries on research, standards, skills, infrastructure and market access through
the Quantum Strategy Board (PM14b).
Scope and delivery. PO2 would be implemented mainly through existing Union and national
bodies, without creating a new Union agency, fund or general obligations for all quantum
companies.
5.2.5. Policy Option 3 - High-intensity intervention
PO3 would build on PO2’s core architecture but introduce higher-intensity measures, including
investment capacity, strategic procurement, and PQC preparedness.
(i) Sustaining and advancing Europe’s quantum R&I excellence. Same as under PO2.
(ii) Accelerating industrialisation and deployment of quantum technologies and solutions.
Procurement (PM7c) would include a minimum level of EU value creation or sourcing as a
common eligibility condition for predefined strategic procurement categories, justified by
security of supply or resilience, with market-availability tests, proportionate exceptions,
trusted-partner participation and compliance with Union and international procurement rules.
(iii) Strengthening security and resilience of quantum supply chains, including by
monitoring and mitigating critical dependencies. PO3 would provide a dedicated mandate or
capacity within existing or future instruments (PM10c) offering greater risk-bearing and rapid-
response support for scale-up and strategic capabilities, with reinforced oversight. It would also
make binding the implementation of the PQC roadmap through time-bound migration
requirements. (PM13c). Any such obligations would be implemented and supervised through
the competent authorities under the applicable cybersecurity and sectoral frameworks, with
coordination with critical-entity resilience authorities where relevant; no parallel Quantum Act
supervisory structure would be created. PO3 would also extend PM11b by making information
contributions mandatory by default for designated projects, infrastructure operators and actors
in predefined critical value-chain categories, subject to necessity, proportionality,
134 COM (2026) 503; page 14. A new strategic investment facility that was announced in the technology
sovereignty package of the Union aiming at investing mostly in equity – with a focus on critical technologies,
including digital (AI, chips, etc.), energy and biotech. 135 See Annex 4.1.9, fiches PM11 and PM14. Information requests would be subject to necessity, proportionality,
confidentiality and trade-secret safeguards.
46
confidentiality and data-minimisation safeguards.
These elements would increase administrative, supervisory and compliance costs. Their
impacts and proportionality are assessed in Chapters 6 and 7. All other measures would operate
as under PO2.
5.2.6. Implementation arrangements and reuse of structures
The implementation of the Quantum Act would be entrusted to existing bodies, the mandate of
which already covers quantum aspects. In particular, the EuroHPC JU, or its successor under
the next MFF, would implement the quantum R&I and infrastructure actions falling within its
legal and budgetary mandate. The Quantum Act is without prejudice to the current
EuroHPC regulation and its governance136. The Chips JU, or its successor under the next
MFF, would remain responsible for quantum-chip pilot lines and related semiconductor and
photonics capabilities. Decisions on funding, investment, procurement, State aid and regulation
would remain with the institutions and bodies competent under the applicable legal bases.
The Quantum Strategy Board would identify common priorities, monitor implementation and
issue recommendations for coordinated action. This configuration would ensure visible
quantum governance while respecting existing mandates and avoiding institutional duplication.
Under PO2 and PO3, the Quantum Investment Service Desk would facilitate access to existing
or future Union and national financing instruments. It would not constitute a new financial
institution, and investment decisions would remain with the competent financial bodies, such
as the EIB/EIF, EIC and Invest EU. Likewise, standard-setting would remain with recognised
standardisation bodies; and PQC-related cybersecurity activities with ENISA, the NIS
Cooperation Group and existing cybersecurity authorities. New functions under the Quantum
Act will be limited to gaps not covered by existing structures, notably cross-ecosystem
coordination (PM15), strategic designation (PM5) and quantum-specific dependency
intelligence (PM11).
None of the options involve the creation of a new Union body or agency. Expenditure would
remain subject to the applicable MFF, programme legislation and budgetary procedures.
Detailed responsibilities, staffing assumptions and institutional interfaces are set out in Annex
4.
5.3. Options and measure designs discarded at an early stage
The option-building process considered alternative policy packages and individual measure
designs beyond those retained in Section 5.2.2. These were screened against effectiveness,
coherence with the intervention logic, EU added value, legal and operational feasibility,
proportionality, administrative burden and budgetary implications137.
An approach was discarded at an early stage only where it was manifestly unlikely to address
the identified problems, substantially duplicated existing instruments, lacked sufficient
evidence of necessity or raised clearly disproportionate legal, administrative, or financial risks.
More intensive measures constituting credible alternatives, including strategic procurement
conditions, dependency reporting and binding PQC-preparedness duties, were retained under
PO3 for assessment. An economy-wide mandatory certification or assurance regime was not
136 Any possible change of the Quantum content and governance could be introduced in the framework of the
envisaged revision of the EuroHPC regulation or its successor under the next MFF. 137 European Commission, Better Regulation Guidelines, SWD(2021) 305 final, Chapter 3; Better Regulation
Toolbox, 2025, Tool 16. Options or measures may be discarded if manifestly ineffective, technically or legally
infeasible, incoherent with Union law or clearly disproportionate, provided the reasons are transparently
explained.
47
retained because the available evidence does not demonstrate its necessity or proportionality.
5.3.1. Alternative policy packages not retained
Alternative package Reason for not retaining it
Additional funding
without governance or
delivery reform
Additional resources alone, without changes to coordination or
delivery arrangements would not address fragmented programming,
discontinuities between research and deployment, uneven access to
industrialisation capacity, weak demand, or limited visibility of
dependencies. It could instead reinforce existing fragmentation and
duplication.
Immediate full
centralisation in a new
Quantum JU or Union
agency
A new body could duplicate or disrupt responsibilities of EuroHPC
JU, Chips JU, the Commission and financial institutions, while adding
establishment, transition and institutional-complexity costs. Future
decisions on Union implementation bodies would be taken separately
under the relevant legal and budgetary framework and are not
prejudged by this IA138.
Separate instruments for
computing,
communication, sensing
and quantum-safe
deployment
Separate domain-specific acts would duplicate common provisions on
governance, finance, skills, infrastructure and monitoring and could
create inconsistent requirements across technologies that increasingly
share components, facilities and users.
Table 5.3. Alternative policy packages screened out.
The retained set of options therefore reflects the three levels of intervention identified through
the screening: a predominantly voluntary framework under PO1, a targeted legislative
framework under PO2 and a higher-intensity framework under PO3 testing only those stronger
variants considered sufficiently necessary, feasible and proportionate for full assessment.
5.3.2. Individual measure designs screened out
Measure design Reason for not retaining it
Unconditional
economy-wide fixed-
date PQC migration
and procurement
obligations
This measure was not retained because technological maturity,
legacy-system complexity and sectoral risk differ substantially and
the coordinated PQC roadmap already forms part of the baseline.
PO1 adds no PQC-specific measure beyond the baseline, while PO2
provides structured cooperation to support implementation and
monitor progress under the existing PQC roadmap. By contrast, PO3
makes implementation of the existing PQC roadmap binding through
time-bound migration requirements. Scope and timing would be
aligned with the existing roadmap and applicable frameworks139.
A closed statutory list
of third countries
eligible to participate
in, receive support
under or access
relevant Quantum Act
actions
A fixed country list would be insufficiently adaptable to
technological, security and geopolitical developments and could
unnecessarily restrict beneficial cooperation. The retained approach
instead relies on transparent criteria, reciprocity and the protection
of Union interests.
Broad stockpiling or
general crisis-
intervention powers
Available evidence supports strategic mapping, early warning and
targeted mitigation, but does not demonstrate the necessity of broad
emergency powers across the emerging quantum ecosystem.
138 The assessment of institutional alternatives and interfaces with existing bodies is provided in Annex 8. 139 Commission Recommendation (EU) 2024/1101 (Coordinated Implementation Roadmap for the transition to
Post-Quantum Cryptography Directive); (EU) 2022/2555 (NIS 2 Directive); Regulation (EU) 2024/2847 (Cyber
Resilience Act); Regulation (EU) 2019/881 (Cybersecurity Act).
48
A separate quantum-
specific FDI-screening
or export-control
regime
Existing Union frameworks already apply to relevant investments
and dual-use technologies. The Quantum Act may provide evidence,
monitoring and coordination interfaces but should not duplicate the
competent authorities or decision-making procedures established
under those frameworks27.
Automatic statutory
step-in, matching or
change-of-control
rights
Case-by-case European equity investment, co-investment or support
for coordinated counteroffers through the Quantum Investment
Service Desk provides a more proportionate alternative, subject to
independent due diligence and the applicable financial, State aid and
competition rules.
Table 5.4. Specific measure designs screened out.
Strategic procurement conditions, dependency reporting and binding PQC implementation
requirements form part of PO3 and are assessed in Chapters 6 and 7. Horizontal economy-wide
certification or assurance requirements do not form part of any retained option.
Other proposals extending beyond the scope of the initiative, including Union-wide measures
concerning taxation, company law, legal migration or general accelerated permitting are
documented in the full screening matrix but were not developed as measures. The detailed
screening scores, evidence, legal considerations and three screening-only variants excluded
from the option totals are presented in Annex 4140.
6. WHAT ARE THE IMPACTS OF THE POLICY OPTIONS?
This chapter assesses the incremental economic, social, environmental, fundamental-rights and
implementation impacts of PO1, PO2 and PO3 against the dynamic baseline in Section 5.1.
Effects already expected from existing Union and national measures are included in the
baseline and are not attributed to the policy options.
In assessing the options, the analysis therefore includes the capacity, skills and initial demand
expected from national measures. For example, where a national programme has already
provided for a quantum facility or placed an order for a quantum system, the baseline includes
the expected use of that facility or the demand generated by that order. The additional effect of
an option would arise only to the extent that it enables further use, for example by giving firms
in other Member States access they would otherwise lack, or brings together purchases that
public buyers would otherwise undertake separately.
Monetisation is limited to impacts supported by sufficiently robust evidence. The assessment
distinguishes between regulatory and implementation costs, programme resources subject to
future budgetary decisions, and broader economic and societal effects. Results remain
indicative rather than predictive, given limited granular data and strong dependencies on
technological breakthroughs, competition, and future budgets. These outcomes depend heavily
on technological progress, global competition, private investment and future Union and
national budgets. Detailed assumptions, calculations and sensitivity analysis are provided in
Annex 4. The Competitiveness Check and SME Check are provided in Annexes 5 and 6
respectively.
6.1. Overview of the principal expected effects
The three policy options differ in legal force, scope, and in their respective expected benefits,
costs and risks. PO1 entails lower costs and fewer adverse effects but depends on voluntary
140 See Annex 4, full policy-option screening matrix and policy-measure variant assessment. The three screened
high-intensity variants excluded from the option totals are: a full-service user-support Centre, unconditional fixed-
date quantum-safe obligations and a closed statutory list of international partners.
49
participation. PO2 provides greater continuity and more secured results across research,
industrialisation, finance, demand, skills and resilience, while limiting obligations to specific
actors and activities. PO3 extends formal coverage in key areas, but entails higher
administrative, compliance, budgetary, competition and proportionality risks (Subsection
6.3.1). Detailed measure-level attribution is provided in Annex 4 Annex 8.
Quantum technologies may generate wider benefits for productivity, innovation, health,
security, resilience and the environment, while also creating risks related to cybersecurity, dual
use, resource consumption and skills. These broader effects depend primarily on technological
development and uptake and cannot be attributed solely to the Quantum Act; the policy options
may influence their timing, scale and the Union’s ability to capture their benefits. A more
detailed analysis is provided in Section 7.2 of Annex 8.
6.2. Economic impacts
6.2.1. Regulatory, administrative and indirect costs
The three policy options generate different levels of incremental implementation,
administrative and adjustment costs. PO1 has the lowest costs because it relies mainly on
voluntary coordination and information tools. PO2 entails moderate additional public-sector
and targeted business costs linked to structured planning, delivery, procurement coordination
and dependency monitoring. PO3 is the costliest option because its higher-intensity finance,
procurement and reporting measures increase public-sector, business and compliance costs.
Detailed cost-bearer allocations and assumptions are provided in Annex 4.
Cost dimension PO1 PO2 PO3
Administrative and
implementation
costs
Lowest Moderate Highest
Business burden No
administrative
burden
Limited and targeted
administrative burden
Substantially higher burden
Programme-
resource needs
Primarily based
on existing
instruments
Additional resources,
subject to future
programme and
budget decisions
Greater and more predictable
resources, including dedicated
financial capacity
Main efficiency
risk
Low take-up may
reduce value for
money
Coordination
complexity or
insufficient
implementation
resources may limit
effectiveness
Higher programme-resource
requirements may reduce
flexibility, increase costs and
risk crowding out alternative
priorities or technological
approaches.
Total societal cost,
NPV 28-37
EUR 41.44
million
EUR 105.92 million EUR 163.56 million
Evidenced cost
savings (excludes
hub/centre service
value)
EUR 5.39
million
EUR 13.59 million EUR 14.04 million
Net modelled cost
after savings
EUR 36.05
million
EUR 92.34 million EUR 149.52 million
Table 6.1. Qualitative analysis and quantitative overview of costs.
Under PO2, costs fall predominantly on public authorities and implementation actors, while
business-facing costs are concentrated on applicants, beneficiaries, designated Strategic
Projects and actors subject to specifically defined information obligations. New business
50
administrative burden is estimated at EUR 5.46 million NPV over 2028–2037, equivalent to
approximately EUR 0.621 million per year; the corresponding estimate is EUR 0 for PO1 and
EUR 14.38 million NPV for PO3. Detailed calculations are provided in Annexes 3 and 4.
The monetary assessment is deliberately partial and should not be interpreted as a full welfare
balance. Most expected impacts on innovation, industrial capacity, firm growth, skills,
resilience, security and productivity cannot be monetised robustly. PO3 is materially more
costly than PO2 because of its additional administrative, adjustment and supervisory
requirements. Detailed calculations and sensitivity ranges are provided in Annex 4.
6.2.2. Public-budget and programme-resource implications
The public-sector costs reported in Table 6.1 are analytically separate from programme
expenditure, such as grants, infrastructure investment, procurement and financial-instrument
capital. Programme expenditure depends on future budgetary and investment decisions and is
not treated as a societal cost or monetised benefit. Detailed assumptions on the programme-
resource estimates, including the Union, Member State and industry contributions, are provided
in Annex 4, Sections 4.1.7, 4.4.3, 4.4.4 and 4.4.9.
PO1 would rely mainly on existing instruments, and no separate programme-resource envelope
is estimated. For PO2, the indicative Union contribution is estimated at EUR 5.2–6.1 billion
over 2028–2034, corresponding to approximately EUR 12.9–18.1 billion in total direct
programme resources including Member State and industry contributions. PO3 would be
expected to require higher resources for its more intensive measures, but no separate envelope
is quantified because this would depend on future programme, financing and budgetary
decisions. These figures are indicative planning ranges, not funding commitments or
entitlements, and remain subject to the future MFF, programme legislation and individual
funding, procurement and investment decisions. For context, the broader financing needs of
the European quantum ecosystem are estimated at around EUR 50–60 billion, mainly equity;
this is separate from the programme-resource estimates. These figures are further detailed in
Annex 4 (Sections 4.1.7, 4.4.3, 4.4.4, 4.4.9).
6.3. Competitiveness, innovation, market development and SMEs
6.3.1. Start-ups and SMEs
Start-ups and SMEs make up most of the mapped European quantum companies. Their main
constraints concern access to specialised facilities, later-stage finance, customers and
procurement opportunities. The initiative is therefore considered highly relevant for SMEs.
PO1 would impose the lowest burden and could improve information and matchmaking.
However, its limited delivery capacity would leave most access, finance and demand
constraints unchanged. PO2 would support SMEs through first-level user support, shared
facilities, staged procurement, investor preparation, templates and once-only information
reuse. Business obligations would arise principally where a firm chose to apply for or receive
support, participated in a designated project or fell within a narrowly defined critical reporting
category. PO3 could provide stronger financial and procurement support but would extend
dependency-reporting requirements to a wider, although still defined, population. The
reporting and compliance costs stemming from the measures may weigh more heavily on
smaller firms. Scope thresholds, simplified procedures, exemptions, technical assistance and
once-only reuse of information would therefore be necessary141.
141 Annex 6, SME Check, covering SME prevalence, disproportionate fixed costs, access to facilities and finance,
procurement, simplified reporting and avoidance of SME-threshold cliff effects.
51
The SME check and detailed model indicate that the initiative is overall beneficial for SMEs.
Business-facing costs remain limited and targeted under PO2 but rise under PO3 because of its
procurement and wider dependency-reporting requirement. Within the partial monetary
perimeter, PO2 business costs are broadly offset by evidenced administrative and transaction-
cost savings, whereas PO3 produces a substantially less favourable result. Aggregate values,
cost-bearer breakdowns and SME-specific limitations are provided in Annexes 4 and 6.
6.3.2. Competition and market structure
The options may affect competition through access to infrastructures, procurement, standards,
financing and support for strategic capabilities.
PO1 is expected to have limited effects on market structure, while improved information and
access could modestly lower barriers to entry. PO2 could strengthen competition by improving
cross-border access to facilities, finance and public buyers, particularly for start-ups and SMEs.
However, concentration of support in a limited number of projects, and premature
standardisation could reduce the number of suppliers, reinforce incumbents or create
technological lock-in. These risks would be mitigated through open and transparent selection,
technology-neutral and proportionate criteria, market-availability tests, interoperability and
access requirements, and periodic review. PO3 would create higher competition risks because
broader procurement conditions and stronger strategic intervention could further restrict
supplier participation or crowd out alternative technologies and private investment.
6.3.3. Research, innovation and industrialisation
The main economic effects on research and industrialisation would arise from improved
coordination, better access to specialised infrastructure and stronger pathways from research
to deployment. PO1 would mainly lower information and search costs and improve use of
existing capacity. However, its impact would likely remain limited due to its voluntary
participation. PO2 could deliver stronger economic effects by improving access to prototyping,
testing, validation and qualification facilities, reducing gaps between R&I and industrial
deployment, while strengthening technology transfer and increasing the utilisation of facilities.
PO3 would preserve the benefits of PO2 while potentially providing greater certainty of
implementation through its higher-intensity measures. These additional gains would, however,
require careful design and governance to ensure that stronger intervention does not unduly
reduce flexibility, concentrate market power or lock in technology choices too early.
Effects on productivity, market share and aggregate value added cannot be estimated robustly.
They depend on whether supported technologies outperform classical alternatives, how quickly
markets develop and the scale of future investment142. More specifically, continued advances
in classical AI and high-performance computing, including for science discovery, could reduce
or shift the relative advantage of quantum computing for some applications, raise the
performance threshold quantum systems must surpass and influence which quantum use cases
become commercially relevant first. Improvements in processors, specialised accelerators,
algorithms, HPC architectures and AI could extend the range of problems that can be solved
efficiently with classical systems, potentially narrowing the economically relevant niche for
quantum computing in some use cases. The assessment of quantum competitiveness and
impacts should therefore remain dynamic and account for the evolving performance, cost and
142 Quantum technologies may create financial-sector transition risks, notably from cryptographic migration,
operational disruption and dependence on critical providers, while also offering opportunities in secure
communications and advanced analytics. As these effects cannot be robustly quantified, they are assessed
qualitatively and should be monitored with the relevant Commission services, European Supervisory Authorities
and competent authorities.
52
energy efficiency of both quantum and classical computing.
6.3.4. Technological lock-in
Given that quantum technologies are still emerging and only a limited number have reached a
high level of maturity, the risk of technological lock-in must be taken into account when
investing too early in a specific technological approach. The PMs presented are technology-
neutral and designed to mitigate this risk as far as possible.
PO1 entails a relatively low risk of technological lock-in, given the voluntary nature of its
measures and the absence of ring-fenced financing or mandatory requirements. As a result, this
option is unlikely to force the selection of one technology over another, thereby reducing the
risk of lock-in.
PO2 increases this risk because it formally establishes initiatives such as Grand Challenges
(PM3) and Strategic Projects (PM5), which require choices to be made between competing
technological approaches. However, the risks associated with these PMs are mitigated by
design: they would rely on regular portfolio reviews, milestone-based assessments and
independent expert advice to compare progress across different pathways and determine
whether support should continue, be expanded, merged, reoriented or discontinued, in line with
Horizon Europe practice.
PO3 is broadly similar to PO2 in this respect, but it introduces a somewhat higher risk due to
PM10, which includes a dedicated quantum investment fund (ring-fenced financing). This may
increase the likelihood of concentrating resources on a technological pathway that does not
deliver the expected results or sufficient added value. To mitigate this risk, eligibility for
financial support would be assessed against criteria such as expected results, track record and
European added value, among others.
Lastly, more features of PMs to mitigate technological lock-in risk across all options include
prioritising open standards and interoperability, in order to reduce the cost of switching systems
if one fails to meet the established goals. They also include factoring future migration and
disposal costs into the initial financial analysis of options, for instance, for Grand Challenges
or Strategic Projects, so as to avoid becoming unintentionally locked into expensive
maintenance for years.
6.3.5. Scale-up finance and strategic-capability support
The main scale-up-finance effects arise mainly from PM10, supported by PM5.2 and PM12,
through investment readiness, project visibility and access to relevant public and private
finance.
PO1 would improve investor awareness, finance readiness and referral, but would not change
the volume or risk profile of available capital nor create a structured response to strategically
significant transactions. PO2 would establish a Quantum Investment Service Desk providing
advisory services on access to grants, equity, quasi-equity, guarantees, debt, procurement and
private co-investment through relevant existing or future Union and national instruments. In
justified cases, it could facilitate European co-investment or coordinated counteroffers where
acquisition, relocation or loss of control could materially affect a strategically important
quantum capability143. PO3 would add a dedicated mandate within the envelope of existing or
future instruments and stronger rapid-response capacity. This could improve visibility and
responsiveness for capital-intensive scale-up and strategic-capability cases but would require
143 The mobilisation range of 1.5–3.5 times Union risk-bearing finance is an illustrative scenario and is deliberately
lower than some historical leverage ratios for comparable instruments. It should not be treated as a forecast or
added to other benefit scenarios.
53
greater public risk-bearing and could crowd out other priorities or private investment.
Compared with PO2, it could improve visibility and speed, but the incremental financing effect
remains uncertain and would depend on additionality, independent due diligence and private-
risk sharing.
6.3.6. Demand and procurement
Demand effects arise mainly from PM7, supported by PM5.1, PM6 and PM12, via buyer
coordination, reference deployments and progression towards follow-on procurement.
PO1 would improve buyer awareness, identification of use cases and supplier-buyer contacts.
It would not create a coordinated procurement pipeline or ensure progression from pilots to
repeat demand. PO2 would support coordinated PCP/PPI, reference deployments and follow-
on demand. This could give firms customer validation and early revenues, while allowing
public buyers to share technical expertise and procurement risk. PO3 would create stronger and
more predictable demand through broader procurement-preference requirements. This could
strengthen the revenue base of European suppliers but with higher expected procurement
premiums and risks of reduced competition, retaliation or supply constraints.
6.3.7. Standards, trusted deployment and resilience
PO1 would support voluntary pre-standardisation and benchmarking but would add no PQC-
specific measure beyond the dynamic baseline. The substantive PQC transition and related
technical migration costs remain part of the dynamic baseline. PO2 would add structured
cooperation between the Commission, Member States and relevant bodies and other relevant
existing cybersecurity structures, including monitoring of implementation progress. PO3
would retain this coordination layer and additionally make implementation of the existing PQC
roadmap binding through time-bound migration requirements. These conditions could
strengthen security of supply and European industrial capabilities where suitable suppliers
exist, but may increase prices, reduce bidder participation or limit access to necessary non-
European technologies. Market-availability tests, proportionality and appropriate exceptions
would therefore be required.
No differentiated avoided-security-loss benefit is included in the central monetary comparison
as probability, exposure and causal contribution cannot be estimated with sufficient confidence.
No separate substantive PQC migration costs are attributed to PO3, as these implementation
costs are already part of the dynamic baseline. Any further avoided-loss effect is treated only
as a low-confidence scenario.
6.3.8. Trade and investment
The options may also affect international competitiveness, trade and investment through
infrastructure and market access, procurement conditions, standards, financing, dependency
mitigation and international cooperation. PO1 would have limited direct effects. PO2 could
strengthen the ability of European firms to scale and compete internationally while preserving
openness to international investment and diversified supply. PO3 could entail greater risks of
restricting supplier participation, raising input costs or triggering reciprocal measures because
of its stronger procurement and strategic-intervention conditions. Any such measures would
therefore need to be targeted, proportionate and consistent with applicable Union and
international obligations.
6.3.9. Fraud and impacts on consumers
No material direct impacts on consumers or consumer prices are expected, as the options do
not impose obligations on citizens or consumers. No specific fraud risks beyond those
addressed through existing Union financial-control, procurement and anti-fraud frameworks
54
have been identified.
6.4. Social and territorial impacts
A more detailed analysis of social and territorial impacts is in Section 7 of Annex 8.
6.4.1. Social impacts
The main social impacts arise from PM6 and PM9, supported by training and user-capability
inputs under Grand Challenges, Hubs, Strategic Projects and procurement actions in PM3-PM5
and PM7.
PO1 would improve information on training and mobility but have limited direct effects on the
supply of industrial, engineering and user skills. PO2 would connect training, mobility and user
support to infrastructures, Grand Challenges, Strategic Projects and procurement. PO3 would
retain the same skills and user-support arrangements as PO2. Any additional employment
effects under PO3 would therefore arise indirectly from its higher-intensity finance,
procurement and resilience measures and would depend on actual investment and deployment.
Available global evidence from a survey also points to participation and retention barriers for
women and some marginalised groups in quantum144; 145. Skills development and mobility
measures should therefore include inclusive outreach and, where proportionate, monitor
participation and completion by sex146.
It is also to be noted that quantum applications, often combined with AI, will support public
services in areas such as e.g. health diagnostics, drugs discovery, infrastructure and
environmental monitoring and secure communications. However, these benefits will depend
on affordability, successful deployment and demonstrated performance advantages over
classical alternatives. Therefore, they should not be attributed solely to the initiative.
The options would not impose obligations on citizens or consumers and are not expected to
have material direct effects on consumer prices or income distribution.
6.4.2. Territorial impacts
Territorial impacts arise mainly from the Hubs and Competence and Acceleration Centres
(PM4 and PM6). PO1 would improve information on existing capabilities but would not
materially change their geographical accessibility. PO2 would combine first-level user support,
aiming at one access point per Member State with specialised capability-based Hubs serving
users across borders. PO3 would retain the same territorial architecture. Benefits may initially
concentrate in established quantum clusters, but cross-border access to specialised Hubs and
first-level support across Member States could broaden participation and diffusion.
Transparent selection and access conditions and targeted outreach should mitigate geographical
concentration. No robust regional employment or investment forecast can be made before
future programme design and budgets are known.
6.4.3. Environmental impacts
Direct environmental impacts arise mainly from infrastructure and deployment activities. PO1
would have minimal direct effects, while PO2 could increase electricity and cooling demand,
144 Key Inclusion Indicators for Quantum Technologies in Europe, April 2025, p. 5: women represented 24% of
project leaders/principal investigators in EU-funded quantum technology projects in 2024. 145 Propp et al., Meeting the Needs of the Global Quantum Science Community, 2025: half of surveyed
marginalised quantum scientists had considered leaving the field, vs small minority of non-marginalised. 146 GESDA and OQI, Intelligence Report on Quantum Diplomacy in Action 2025–2026, 2025, pp. 10–13; Propp,
T. B. et al., “Meeting the Needs of the Global Quantum Science Community: A Call to Action”, 2026. Global,
non-representative evidence.
55
cleanroom activity, specialist-material use and equipment waste. In the central design, PO3
uses the same core infrastructure as PO2 and would have a higher footprint only if additional
deployment were financed. The Climate Law consistency check does not identify a significant
inconsistency with the Union’s climate-neutrality objective. No significant environmental
harm is expected at framework level; project-level impacts remain subject to applicable
environmental requirements, including the do-no-significant-harm principle where relevant.
Environmental effects147 may arise from the production, operation and end-of-life treatment of
quantum hardware and facilities, as well as from downstream applications. Quantum
technologies could support the green transition through advances in materials and energy
technologies, logistics and energy-system optimisation, climate modelling and environmental
and infrastructure sensing148. Quantum computing could require substantially less
electrical power than today’s most powerful classical supercomputers. While leading
exascale systems consume tens of megawatts, some energy-efficient quantum-computing
architectures are expected to have system-level power requirements two to three orders of
magnitude lower, potentially reducing operating costs and pressure on electricity infrastructure.
6.4.4. Impacts on fundamental rights
Quantum technologies can affect fundamental rights depending on their use and level of
maturity. Quantum computing could weaken existing encryption, creating risks for privacy and
the protection of personal data, while quantum sensing and dual-use applications may raise
surveillance and misuse concerns. Existing Union frameworks on cybersecurity, data
protection, AI and research security already address part of these risks. The Quantum Act
would not authorise specific uses of quantum technologies but would improve preparedness
and establish conditions for support.
PO1 would add no PQC-specific measure beyond the dynamic baseline. For PO2 and PO3, the
main initiative-specific implications arise from Strategic Project designation, procurement,
standards and testing, targeted dependency-information requests and PQC preparedness. PO2
could support the freedom to conduct an improved access to infrastructure, finance, testing and
standards, while PQC preparedness could strengthen protection of personal data and digital
privacy. At the same time, information requests and support measures may affect
confidentiality, trade secrets, intellectual property and procedural rights. Safeguards should
therefore ensure necessity and proportionality, purpose limitation, confidentiality, protection
of trade secrets and effective procedural rights. PO3 would entail greater fundamental-rights
implications because of its binding PQC requirements and broader dependency-reporting
obligations149. Impacts would mainly concern specific actors and public authorities rather than
the wider quantum ecosystem.
6.5. Governance and implementation feasibility
Governance would build on existing mandates: the Quantum Strategy Board would provide
advice and support coordination, while implementation would rely on the Commission,
relevant Union bodies, including the EuroHPC and Chips JUs within their mandates, and
147 Environmental assessment covers only the additional footprint of capacity supported by the intervention,
including quantum integrated with HPC/AI infrastructure; it does not attribute the overall energy footprint of
AI/datacentres to the initiative. 148 Root, D., Quantum Technologies in the Context of Climate Change, NanoEthics 19 (2025); Auffèves, A.,
Quantum Technologies Need a Quantum Energy Initiative, PRX Quantum 3 (2022); kiutra & CIRCULAR
REPUBLIC, Circularity in the Quantum Industry, 2026. 149 Charter of Fundamental Rights of the European Union, in particular Articles 8, 13, 16, 17, 41 and 47;
Regulation (EU) 2016/679; Directive (EU) 2016/943.
56
Member States.
Feasibility differs across options. PO1 would be readily feasible, but its effectiveness would
depend on voluntary uptake. PO2’s feasibility is high since it would be implemented through
existing bodies. The main challenge would be securing sufficient administrative capacity and
coordination arrangements. PO3 is more complex, as it would require broader planning, a
dedicated financial capacity, a broader strategic procurement framework, digital by default
implementation, and significantly greater resources, especially at Member State level. Detailed
staffing assumptions and peak-resource estimates are provided in Annex 4. Implementation
would be digital by default, using interoperable procedures and reusing information in line with
the once-only principle where legally possible, thereby limiting additional reporting and
administrative burden.
6.6. Uncertainty and sensitivity
As mentioned above, this assessment is subject to significant uncertainty (technology progress,
resources, likelihood of supply disruptions, etc.). The values used in the analysis in Annex 4
are scenarios, not statistical confidence intervals. They show how results change under
plausible assumptions and should not be read as forecasts. Benefits expressed in different units
are not aggregated150.The sensitivity analysis in Annex 4 confirms that PO2 is most affected
by assumptions on resources required for Hub services, adaptation of existing competence
centres, programme implementation and its uptake. PO3 is additionally sensitive to the scope
of wider dependency-reporting requirements, procurement costs and the effectiveness of
additional risk-bearing finance. The low, central, high and full-build scenarios, together with
the probabilistic analysis, are presented in Annex 4.
7. HOW DO THE OPTIONS COMPARE?
This chapter compares PO1, PO2 and PO3 against the dynamic baseline in terms of
effectiveness, efficiency and coherence, while also considering trade-offs, uncertainty,
subsidiarity, proportionality, implementation feasibility and fundamental rights151.
The options are alternative packages differing in legal force, scope and delivery. Ratings are
reasoned judgements based on Chapters 2, 5 and 6 and Annex 4, not forecasts or aggregated
scores. Effectiveness is rated as: 0 no material change; + limited; ++ substantial; +++
significant positive effect. Costs and burdens are assessed separately.
7.1. Effectiveness in achieving the specific objectives
150 European Commission, Better Regulation Toolbox, Tool #65; Annex 4 assumptions and sensitivity tests. 151 European Commission, Better Regulation Guidelines, SWD (2021) 305 final, Chapter 3, 2025.
57
Table 7.1. Effectiveness against the specific objectives.
BAU is rated 0 for all objectives, as it represents the baseline against which additional effects
are assessed. PO1 would improve framework conditions across all objectives but remain
limited by voluntary participation, with no common access conditions, added risk-bearing
capacity, coordinated procurement or complete dependency information. PO2 would deliver
substantial effects across all objectives through common governance, structured delivery and
targeted obligations, with broader coverage and continuity than PO1. PO3 would retain PO2’s
core arrangements while adding stronger finance, procurement, quantum-safe deployment and
dependency reporting. It would therefore be more effective mainly for SO-C, SO-F, SO-G, but
with higher costs, complexity and proportionality risks.
7.2. Efficiency
Efficiency compares expected effects with administrative, implementation and indirect costs;
monetised estimates cover only effects that can be quantified reliably. PO1 is least costly but
leaves key gaps unresolved. PO3 is materially more costly than PO2 and would require
significantly greater benefits to justify its higher burdens, which the evidence does not establish
with sufficient confidence. PO2 combines moderate costs and targeted burdens with coherent
delivery across all seven objectives through existing institutions. Overall, it offers the best
balance of effects, costs and implementation risks. Detailed estimates are provided in Annex
4.
Efficiency
dimension
PO1 PO2 PO3
Societal costs Lowest Moderate Highest
Business burden Non-compulsory Limited, targeted Substantially higher
Programme
resources
Limited Material Substantially higher
Main risk Low
participation
Complexity / under-
resourcing
Premiums, crowding out and
lock-in
Overall Low cost, but
gaps remain
Best balance of
effect, cost and
feasibility
Added coverage does not
generally justify higher costs
and risks
Table 7.2. Efficiency of policy options. Detailed quantitative estimates, assumptions
Specific objective PO1 / PO2 /
PO3
Main reason
SO-A – Coordination
and delivery
+ / ++ / ++ Voluntary alignment under PO1; structured
planning and review under PO2/PO3.
SO-B – Lab-to-fab
and infrastructure
access
+ / ++ / ++ Mapping/referral under PO1; targeted hubs,
infrastructures and centres under PO2/PO3.
SO-C – Scale-up
finance
+ / ++ / +++ Finance readiness under PO1; structured
pipeline under PO2; dedicated capacity under
PO3.
SO-D – Demand and
first buyers
+ / ++ / ++ PO2/PO3 strengthen demand; PO3 preferences
may constrain competition and availability.
SO-E – Skills and
user support
+ / ++ / ++ PO2/PO3 integrate skills and user support with
delivery measures.
SO-F – Trusted and
quantum-safe
deployment
+ / ++ / +++ Voluntary support under PO1; coordinated
standards/PQC support under PO2; binding PQC
implementation under PO3.
SO-G – Dependencies
and resilience
+ / ++ / +++ Voluntary visibility under PO1; targeted
requests/referrals under PO2; mandatory
requests for critical categories under PO3.
58
and sensitivity ranges are set out in Annex 4.
7.3. Coherence
Coherence assesses the consistency of each option with Union instruments, the internal market
and international commitments.
PO1 is broadly coherent and preserves openness, but it does not provide a complete pathway
from priority setting to industrialisation, finance, procurement and deployment. PO2 offers the
strongest coherence by integrating these elements while complementing existing EU
instruments and using targeted resilience, dependency-monitoring and PQC measures. PO3
remains broadly coherent but its wider intervention increases risks of overlap, market
distortion, fragmentation and tensions with competition and international commitments.
Overall, PO2 provides the best balance of integration, complementarity, resilience and
openness.
7.4. Trade-offs and synergies
Trade-offs and synergies mainly arise from how the measures work together within each policy
option.
PO1 has a broad horizontal logic: most measures are designed to improve information flows
(PM1, PM15, PM16), but also visibility (PM11), networking (PM2), skills intelligence (PM9),
investor contacts (PM10, PM12), public buyer coordination (PM7, PM12), standards support
(PM8) and supply-chain mapping (PM11). This creates some internal synergies, but they are
mostly soft synergies, because they rely on voluntary take-up and do not create a structured
implementation chain. For example, PM11a (voluntary mapping), PM12a, and PM14a can
collectively improve visibility on dependencies and external cooperation opportunities.
However, these synergies have limits, notably because the policy measures are not tied together
through binding governance, systematic steering and priority setting mechanisms. As a result,
the risk of fragmentation remains largely intact across all dimensions: between Member States,
in funding, inn procurement and in the visibility and mitigation of supply-chain risks. In short,
PO1 maintains high flexibility and a low administrative burden, but creates fewer synergies
because coordination, infrastructure access, finance and procurement remain voluntary.
PO2 creates the strongest synergies by connecting programming, infrastructure, finance, skills,
standards and procurement, while adding obligations only in specific cases. It shows the
strongest internal synergies in a balanced sense, as it establishes a structured chain from
research to industrialisation, deployment, finance, procurement, skills and resilience, while still
relying mainly on existing bodies and instruments. Its core strength lies in fact that the
measures are not isolated: rather, they form a coherent system architecture. For example, PO2
creates strong synergies in terms of strategic governance and coordinated implementation:
through PM1, PM15 and PM16, it establishes a governance triangle involving strategic
alignment, oversight and stakeholder input. This differs from PO1, where dialogue exists but
lacks structured follow-through. Nevertheless, PO2 still relies on voluntary private sector
participation and implementation continues to depend on existing programmes and national
budgets. In addition, the benefits of PO2 may be concentrated, private investment could be
crowded out, procurement may become more costly, and standards could be set too early.
PO3 could improve certainty and resilience in some areas, but it also entails greater risks, such
as higher costs, reduced supplier choice, increased administrative burden and constraints on
openness. In addition to the synergies already present in PO2, it introduces stronger synergies
in strategic and security-sensitive components, namely investment capacity (PM10), strategic
procurement (PM7) and binding PQC preparedness (PM13). These measures can be mutually
reinforcing: binding PQC migration requirements (PM13c) create predictable demand for
59
secure solutions; strategic procurement (PM7c) channels that demand towards trusted and
resilient suppliers; and dedicated investment capacity (PM10c) enables those suppliers to scale.
Overall, while PO3 could reduce fragmentation to a greater extent than PO2 in certain areas, it
also creates new risks of fragmentation. In particular, if EU value-creation conditions are too
restrictive or too difficult to apply, markets could split between strategic and commercial
segments. In addition, smaller firms or less mature actors may face difficulties in meeting
compliance, reporting, or procurement eligibility requirements. These points complement the
assessment set out in sections 7.1 to 7.3.
7.5. Uncertainty and sensitivity
The policy options differ in how uncertain they are. As explained in Section 6.6, each option
is affected by different risks: PO1 depends heavily on voluntary participation. If few
join, coverage and effectiveness fall, while coordination costs stay broadly the same. PO2
depends on available programme resources, use of shared facilities and user-support services,
and the size of coordinated procurement and investment plans. PO3 is most uncertain, as it
depends on administrative capacity, procurement costs, how well risk-bearing
finance works and the scope and cost of wider dependency reporting.
The illustrative multi-criteria assessment ranks PO2 first under the central, equal-weight,
efficiency-heavy and security-heavy weight sets tested. Under the security-heavy test, the gap
between PO2 and PO3 narrows substantially but the ranking is not reversed. The assessment
should therefore be interpreted as decision support rather than as a mechanical decision rule.
Detailed scores, weights, sensitivity tests and switching thresholds are presented in Annex
4. The probabilistic analysis likewise highlights the limit of the monetised perimeter
and should not be used mechanically to determine the preferred option. Complete distributions
and methodological qualifications are set out in the Annex 4.
7.6. Subsidiarity, proportionality and overall comparison
As detailed in Chapter 3, the cross-border nature of quantum research, infrastructures,
finance, procurement, and value chains justifies action at Union level.
PO1 generates Union added value through voluntary coordination. However, it relies largely
on already existing initiatives and remains voluntary in nature, resulting in more limited
impacts than the baseline. PO2 introduces additional functions requiring action at Union
level, notably common review mechanisms, access to cross-border infrastructure, Strategic
Quantum Infrastructures, coordinated procurement and financing, the designation of Strategic
Projects and targeted monitoring of dependencies. PO3 also meets the subsidiarity test for
certain measures. However, the need or its broader centralisation and more far-
reaching obligations is demonstrated less clearly.
From a proportionality perspective, PO1 is the least intrusive option, but it is not sufficiently
effective to address the identified needs. PO2 confines binding measures to areas where
voluntary coordination is unlikely to ensure adequate coverage, continuity, or
effectiveness. By contrast, PO3 would impose more far-reaching obligations, including
binding implementation of the existing PQC roadmap, stronger procurement conditions,
targeted mandatory dependency reporting and increased public risk-bearing. The available
evidence does not demonstrate that this additional intervention intensity is necessary or
proportionate.
Criterion PO1 PO2 PO3
Effectiveness Limited Substantial Highest formal coverage
60
Efficiency Moderate Highest Moderate to low
Coherence High, but limited
additionality
Highest Moderate
Implementation
feasibility
Easy to put in
place but results
are less certain
because
participation is
voluntary
Easy to implement and
more likely to deliver
results, because it uses
existing structures, with
some targeted binding
rules.
Harder to implement
because it needs a
stronger regulatory
framework and more
resources.
Business and
admin burden
Lowest Targeted Highest
Union added
value
Positive but
limited
Strong Strong for selected
measures
Proportionality
and rights
Least intrusive
but insufficient
Targeted and
manageable with
safeguards
Higher risks
Robustness Vulnerable to low
participation
Highest Vulnerable to higher costs
and slower market
maturity
Overall Does not address
all residual gaps
Best overall balance Additional effects
generally do not justify
additional costs and risks
Table 7.3. Overall comparison policy options.
Overall, PO2 is materially more effective than PO1 while remaining more targeted, adaptable
and feasible to implement than PO3. It contributes to all seven specific objectives, limits
obligations to those actors and activities for which EU intervention is justified and relies
primarily on existing competent bodies and instruments. PO2 therefore performs best overall in
terms of effectiveness, efficiency, coherence, subsidiarity, proportionality,
implementation feasibility and robustness. Chapter 8 presents the preferred option and its
detailed components.
8. PREFERRED OPTION
The preferred option is PO2 – Enabling Quantum Framework Act. PO2 addresses all seven
specific objectives more effectively than PO1, while avoiding the additional costs, burdens,
and implementation risks of PO3. PO1 remains dependent on voluntary participation and would
not provide sufficient continuity and implementation certainty across programming,
industrialisation, finance, demand and dependency monitoring. By contrast, PO2 provides a
binding coordination framework and structured supply-chain monitoring, giving greater
continuity and implementation certainty while keeping obligations targeted and relying mainly
on existing Union and national structures. PO3 could provide greater certainty in selected areas,
but the available evidence does not demonstrate that its additional binding requirements,
stronger procurement conditions, broader dependency reporting and greater public risk-bearing
would generate benefits commensurate with their higher costs and proportionality risks. PO2
therefore provides the best overall balance of effectiveness, efficiency, coherence, subsidiarity,
proportionality, and implementation feasibility. Its implementation and results would be
monitored against the specific objectives in Chapter 4 and the monitoring framework in
Chapter 9.
8.1. Content of the preferred option
PO2 would establish structured EU-Member State governance and programming; formalise the
S&T Excellence Network, Grand Challenges, Hubs, Strategic Quantum Infrastructures,
61
Strategic Projects and Competence and Acceleration Centres; coordinate access to finance,
innovation procurement, skills, standards and PQC implementation; and introduce risk-based
dependency monitoring, a business platform and structured international cooperation. Detailed
measure design is set out in Section 5.2 and Annex 4.
Area Main elements Implementation
Governance and
programming
Quantum Strategy Board,
European Quantum Alliance,
and common EU–Member State
programming framework
Commission and Member States align
priorities and review implementation;
programme and budget decisions remain
with the competent authorities.
Research and
industrialisation
S&T Excellence Network, Grand
Challenges, Technology and
Innovation Hubs, Strategic
Quantum Infrastructures,
Strategic Quantum Projects and
Competence and Acceleration
Centres
Primarily implemented through existing
programmes, bodies, and facilities; new
or upgraded capacity only where
justified by identified European gaps or
demand.
Finance and
market
deployment
Quantum Investment Service
Desk and coordinated innovation
procurement, reference
deployments and first-buyer
support
Commission coordinates access to
relevant financial instruments and
procurement cooperation; investment
and procurement decisions remain with
the competent financial institutions and
contracting authorities.
Skills, standards
and PQC
preparedness
Skills and mobility actions,
standards, benchmarking and
testing support, and structured
cooperation on implementation
of the existing PQC roadmap
Delivered through relevant programmes,
standardisation structures and existing
cybersecurity cooperation mechanisms.
Dependencies,
business
platform and
international
cooperation
Risk-based dependency
monitoring and early warning,
Quantum Business Platform and
structured international
cooperation
Commission coordinates monitoring and
cooperation with Member States;
targeted information requests only where
necessary and proportionate;
international cooperation through
existing frameworks.
Table 8.1. Operational design of the preferred option.
8.2. Legal framework and implementation
PO2 would rely primarily on existing Union and national implementation structures. The
Commission would exercise the functions assigned by the Regulation, with strategic input from
the QSB and, where relevant, the European Quantum Alliance. Funding, procurement, and
investment decisions would remain with the competent programmes, implementing bodies,
contracting authorities and financial institutions.
Implementation would be phased, starting with governance, common procedures and support
functions, followed by networks, procurement preparation, infrastructures and Strategic
Projects, with subsequent review and adjustment based on implementation evidence and
technological maturity.
8.3. Main impacts of the preferred option
Under the central scenario, PO2 has an estimated societal cost of EUR 105.92 million NPV
over 2028–2037 and evidenced monetised savings of EUR 13.59 million, giving a net modelled
cost of around EUR 92.34 million. Most costs fall on public authorities and implementing
actors, while business-facing costs are limited and targeted. There are no direct obligations on
citizens or consumers. Chapter 6 and Annex 4 provide the detailed impact assessment. Beyond
62
the monetised perimeter, PO2 is expected to improve research-to-deployment pathways, firm
scale-up, early demand, skills, and supply-chain resilience, while its main risks concern
implementation capacity, concentration of support and the resource use associated with
infrastructure and deployment.
8.4. Budgetary implications
PO2 would not create automatic funding entitlements. The indicative Union programme
contribution is estimated at EUR 5.2–6.1 billion over 2028–2034, corresponding to
approximately EUR 12.9–18.1 billion in total direct programme resources when Member State
and industry contributions are included. These are planning ranges, subject to the future MFF,
programme legislation and individual funding decisions. For context, the broader financing
needs of the European quantum ecosystem are estimated at around EUR 50–60 billion, mainly
equity; this is a separate sector financing-needs estimate, not a funding commitment and not
part of the EUR 12.9–18.1 billion direct programme-resource range. Detailed assumptions are
provided in Annex 4.
8.5. Simplification and improved efficiency
The preferred option creates an enabling framework that mainly places obligations on public
authorities and designated or EU-supported actors, with targeted information requests only
where necessary. It does not introduce broad reporting or certification duties for the wider
quantum ecosystem.
To reduce burdens, the framework would use common definitions and templates, digital and
interoperable procedures; reuse existing information; allow information to be submitted only
once where legally possible; apply proportionate reporting thresholds; consolidate reporting;
and provide simpler procedures and technical assistance for SMEs. It would also involve no
participation fee, no horizontal mandatory certification and no general reporting obligation for
the wider quantum ecosystem.
8.6. Application of the ‘one in, one out’ approach
New administrative burdens on businesses are estimated at EUR 5.46 million NPV over 2028-
2037, corresponding to an equivalent annual administrative burden of approximately EUR
0.621 million. Detailed calculations are provided in Annexes 3 and 4.
9. HOW WILL ACTUAL IMPACTS BE MONITORED AND EVALUATED?
9.2. Monitoring arrangements
Monitoring and evaluation will assess whether the preferred option is implemented as intended,
meets the seven specific objectives, and remains efficient, proportionate, and coherent with
related Union instruments. The Commission, supported by the QSB, will use a common
framework with harmonised definitions, reporting and data-quality rules, relying mainly on
existing EU, national and programme data and minimising new reporting through digital,
interoperable and once-only data reuse.
Results and headline KPIs will be updated annually. The QSB will assess progress, gaps,
burdens, and unintended effects and may propose corrective action. A public report will be
issued at least every two years, using aggregated data where necessary to protect sensitive
information and explaining relevant data or methodological limitations.
63
9.3. Core monitoring indicators
Specific objective Core indicators
SO-A – Coordination and
delivery
EU–Member State programming/review cycles and follow-up to
agreed priorities
SO-B – Lab-to-fab and
infrastructure access
Facility participation and utilisation; SME and cross-border
access; progression to validation/qualification
SO-C – Scale-up finance Firms financed; public/private capital mobilised; follow-on
financing and Strategic Project progress
SO-D – Demand and first
buyers
PCP/PPI actions; reference deployments; progression from pilots
to repeat procurement
SO-E – Skills and user support People trained; mobility; users supported; skills-gap indicators
SO-F – Trusted and quantum-
safe deployment
Common benchmarks/testing methods used; standards uptake;
PQC implementation-coordination outputs
SO-G – Dependencies and
resilience
Critical inputs assessed; alternative suppliers qualified;
mitigation actions and supply-related delays
Table 9.1. Core indicators. Source: Commission-services evidence and external-support
mappings. Detailed baselines, milestones, definitions, and methodological specifications
are provided in Annex 10. Where robust numerical targets are not yet available,
they will be established during the first monitoring cycle.
Monitoring will cover: (i) administrative burden, against the ex-ante estimate of
approximately EUR 0.621 million per year; (ii) SME participation in facilities, projects,
finance and procurement; (iii) environmental performance, including relevant resource use
and end-of-life effects; and (iv) procedural safeguards, including complaints, review
requests, confidentiality incidents and delays.
9.4. Evaluation
A full evaluation will be carried out five years after the main provisions begin to apply,
assessing effectiveness, efficiency, relevance, coherence, EU added value, proportionality and
key economic, social and environmental impacts, including impacts on fundamental rights,
SMEs and competition152. It will compare results against the baseline, focusing on costs,
facility access and use, private investment, procurement, firm growth, dependencies, supply
delays and the continued necessity of obligations.
Relevant stakeholders will be consulted. Findings will inform future programme, budget and
legislative decisions, including whether measures should be maintained, simplified, expanded
or discontinued.
152 EC, Better Regulation Guidelines, SWD (2021) 305 final, Chapter 3; 2025, Tools 43–47.
EN EN
EUROPEAN COMMISSION
Brussels, 25.11.2026 SWD(2026) 965 final
PART 2/2
COMMISSION STAFF WORKING DOCUMENT
IMPACT ASSESSMENT REPORT
Accompanying the document
Proposal for a Regulation of the European Parliament and of the Council
on a framework of measures for strengthening the Union's quantum ecosystem
(Quantum Act)
{COM(2026) 965 final} - {SEC(2026) 966 final} - {SWD(2026) 966 final} -
{SWD(2026) 967 final}
Table of contents
GLOSSARY ................................................................................................................................................... 2
ANNEX 1: PROCEDURAL INFORMATION .............................................................................................. 9
ANNEX 2: STAKEHOLDER CONSULTATION (SYNOPSIS REPORT) ................................................ 14
ANNEX 3: WHO IS AFFECTED AND HOW? .......................................................................................... 21
ANNEX 4: ANALYTICAL METHODS ..................................................................................................... 27
ANNEX 5: COMPETITIVENESS CHECK ................................................................................................ 77
ANNEX 6: SME CHECK ............................................................................................................................ 78
ANNEX 7: KEY TECHNICAL CONCEPTS .............................................................................................. 86
ANNEX 8: DETAILED IMPLEMENTATION AND IMPACTS ............................................................... 93
ANNEX 9: COHERENCE WITH EXISTING EU LEGISLATION AND INITIATIVES (ACQUIS
MAPPING) ....................................................................................................................................... 117
ANNEX 10: MONITORING AND EVALUATION FRAMEWORK ...................................................... 126
ANNEX 11: SUPPORTING DATA AND ANALYTICAL EVIDENCE .................................................. 134
2
GLOSSARY
1. INSTITUTIONAL, PROGRAMME AND ANALYTICAL TERMS
Term or acronym Meaning or definition
BRBetter Regulation: the European Commission Better Regulation
Guidelines and Toolbox.
CfECall for Evidence.
IAImpact Assessment.
SWDStaff Working Document.
RSBRegulatory Scrutiny Board.
ISGInter-Service Group coordinating preparation of the Impact
Assessment across Commission services; sometimes referred to as
the Inter-Service Coordination Group.
EC / CommissionEuropean Commission.
EU / UnionEuropean Union.
MSMember State(s).
SMEMicro, small or medium-sized enterprise, as defined in
Commission Recommendation 2003/361/EC.
R&IResearch and innovation.
RTOResearch and technology organisation.
JUJoint Undertaking: a Union body implementing programmes or
initiatives with Member States and, where applicable, industry or
other partners.
EuroHPC JUEuropean High-Performance Computing Joint Undertaking. Its
amended mandate covers the Union quantum-technology agenda
across quantum computing and simulation, communication,
sensing and metrology, in addition to high-performance
computing.
Chips JUChips Joint Undertaking, responsible for implementing relevant
semiconductor research, innovation, design and pilot-line
activities, including quantum-chip capabilities.
Horizon EuropeUnion Framework Programme for Research and Innovation for
2021–2027.
Digital Europe
Programme / DEP
Union programme supporting the deployment of strategic digital
capacities, advanced digital skills and access to digital
technologies.
CEFConnecting Europe Facility.
EICEuropean Innovation Council.
EIB / EIFEuropean Investment Bank / European Investment Fund.
3
InvestEUUnion investment-support programme providing guarantees and
financial instruments through implementing partners.
STEPStrategic Technologies for Europe Platform.
ECFProposed European Competitiveness Fund for the post-2027
Multiannual Financial Framework. References in the Impact
Assessment are subject to the outcome of the legislative and
budgetary process.
ENISAEuropean Union Agency for Cybersecurity.
NIS2Directive (EU) 2022/2555 on measures for a high common level
of cybersecurity across the Union.
CRACyber Resilience Act: Regulation (EU) 2024/2847 on horizontal
cybersecurity requirements for products with digital elements.
CEN / CENELEC /
ETSI
Recognised European standardisation organisations: European
Committee for Standardization, European Committee for
Electrotechnical Standardization and European
Telecommunications Standards Institute.
SCMStandard Cost Model: methodology used to estimate
administrative and adjustment costs arising from information and
procedural requirements.
CBACost-benefit analysis.
NPVNet present value: the present value of future costs or benefits after
discounting.
MCDAMulti-criteria decision analysis. A decision-support technique
combining several qualitative or quantitative criteria; it is not used
as a mechanical decision rule in this Impact Assessment.
OIOOOne-In, One-Out approach for examining administrative burdens
and burden offsets.
Restricted Evidence
Pack
Non-public supporting file containing commercially confidential,
company-level, supplier-level or security-sensitive evidence.
Public documents present the relevant findings in aggregated form.
Implementation
modality
Institutional or operational arrangement used to deliver the
selected policy package. It is analytically separate from the choice
of substantive policy option.
Shared-services /
split-governance
model
Possible implementation arrangement in which corporate services
are shared, while governance and Member State representation
follow separate policy tracks. It is a delivery variant, not a separate
substantive policy option.
2. QUANTUM-TECHNOLOGY TERMS
Term or acronym Meaning or definition
4
Quantum
technologies / QT /
QTs
Technologies exploiting quantum-mechanical phenomena to
provide capabilities unavailable to, or significantly
complementing, conventional technologies. The principal domains
are quantum computing and simulation, quantum communication,
and quantum sensing and metrology.
Quantum
computing and
simulation / QC
Use of quantum systems to perform computations or simulations.
Potential advantages are expected for particular classes of
problems rather than for all computational tasks.
Quantum
communication /
QComm
Technologies enabling the transmission, distribution or networking
of quantum information, including quantum key distribution and
longer-term quantum-network capabilities.
Quantum sensing
and metrology / QS
Quantum-based measurement technologies capable of improved
sensitivity or precision, including applications in timing, gravity,
inertial navigation and electromagnetic-field measurement.
QubitBasic unit of quantum information.
QPUQuantum processing unit: hardware that executes quantum
operations or circuits on qubits.
NISQNoisy Intermediate-Scale Quantum: current or near-term quantum
systems with limited scale and significant noise, normally without
full fault tolerance.
QECQuantum error correction: methods for detecting and correcting
errors in quantum information.
FTQCFault-tolerant quantum computing: quantum computing using error
correction and fault-tolerant architectures to perform reliable large-
scale computation.
Quantum advantageDemonstrated capability or performance advantage of a quantum
approach over the best relevant classical alternative for a defined
task, taking account of factors such as speed, accuracy, energy or
cost.
QKDQuantum key distribution: use of quantum principles to establish
or distribute cryptographic keys with the ability to detect certain
forms of interception under defined assumptions.
PQCPost-quantum cryptography: classical cryptographic algorithms
designed to remain secure against attacks using sufficiently capable
quantum computers.
Quantum-safe
preparedness
Organisational and technical preparation for cryptographic risks
created by future quantum capabilities, including awareness,
inventories, crypto-agility, testing, preparedness assessments and
exercises, technical advice and implementation monitoring under
existing cybersecurity frameworks.
Crypto-agilityCapacity of an organisation or system to identify, replace and
manage cryptographic algorithms, protocols and keys without
disproportionate disruption.
5
EuroQCIEuropean Quantum Communication Infrastructure initiative,
supporting the deployment and interconnection of terrestrial and
space-based quantum-secure communication infrastructure in
Europe.
IRIS²Union Secure Connectivity Programme, relevant inter alia to the
space-based dimension of secure connectivity and EuroQCI.
Quantum InternetLong-term vision of advanced quantum networks enabling
capabilities beyond point-to-point QKD, potentially including
distributed quantum computing, networked sensing and quantum-
information services.
QIAQuantum Internet Alliance: research and stakeholder initiative
supporting development of the European quantum-internet
ecosystem. It is distinct from the proposed European Quantum
Alliance under the Quantum Act.
TRLTechnology Readiness Level: scale used to describe the maturity
of a technology from basic research to demonstration in an
operational environment.
Lab-to-fabProgression from research or laboratory prototypes towards
engineering, fabrication, integration, validation, qualification and
industrial deployment.
Dual-use potentialPotential for a technology to have both civilian and security or
defence applications. It does not imply that the technology is
necessarily a listed dual-use item under Regulation (EU) 2021/821.
NISTUnited States National Institute of Standards and Technology. It
publishes technical standards and guidance, including standards
relevant to PQC.
FIPS 203 / 204 / 205NIST Federal Information Processing Standards specifying
selected post-quantum cryptographic algorithms. They may be
used as technical references, without displacing applicable Union
or European standardisation processes.
3. POLICY OPTIONS
Term or acronym Meaning or definition
Dynamic baseline
(BAU)
Counterfactual scenario in which no Quantum Act is adopted,
while existing and already planned Union and Member State
strategies, programmes, legislation, infrastructures and market
developments continue to evolve.
Policy options /
PO1–PO3
PO1, PO2 and PO3 are mutually exclusive appraisal packages.
They share certain building blocks, and PO3 retains the PO2
variant where no credible and proportionate stronger design was
identified. PO2 is not mechanically PO1 plus additional measures,
and PO3 is not mechanically PO2 plus further measures.
PO1 - Horizontal
framework
conditions
Option relying principally on voluntary cooperation,
recommendations, guidance, mapping, common tools, technical
assistance and improved use of existing instruments. It does not
introduce mandatory requirements under the initiative.
6
PO2 - Enabling
Quantum
Framework Act
Targeted legislative and delivery framework establishing
structured EU–Member State governance, research-to-deployment
arrangements, Strategic Projects, finance and first-buyer pathways
and targeted resilience measures. PO2 is the preferred option.
PO3 - High-
intensity
intervention
PO3 retains the PO2 architecture and applies higher-intensity
variants only to PM7 (strategic procurement conditions), PM10
(dedicated mandate or risk-bearing financial capacity), PM11
(wider targeted mandatory dependency information requirements)
and PM13 (binding PQC-preparedness duties for defined critical
public authorities and operators). All other Policy Measure
families use the PO2 variant
Cumulative optionsPO1 adds voluntary enabling and framework-condition measures
to the dynamic baseline. PO2 retains those measures and adds
targeted legislative and delivery mechanisms. PO3 retains the PO2
architecture and adds, or substitutes selected higher-intensity
variants. The three options remain mutually exclusive alternatives
for appraisal.
Conditionality
through existing
vehicles
Use of work programmes, calls, grant agreements, procurement
conditions or financial-instrument rules to apply common delivery
requirements to supported activities, without establishing a
separate general enforcement regime.
4. POLICY MEASURES AND DELIVERY STRUCTURES
Term or acronym Meaning or definition
Policy measure / PMBuilding block used to construct the policy options. The final
architecture comprises PM1–PM16. The complete measure
names, option variants, addressees, implementation
responsibilities and cost assumptions are presented in Annex 4.
Simplification by design is a cross-cutting principle applied to
every measure and is not a separate costed policy measure.
Quantum Strategy
Board
Proposed high-level Commission–Member State body providing
strategic direction, common priority review and implementation
coordination. It would not replace the operational functions of
existing programme or Joint Undertaking bodies.
European Quantum
Alliance
Light stakeholder interface bringing together industry, research,
RTOs, users, investors and relevant standards communities. It
provides input but does not exercise formal funding, certification
or enforcement functions.
Common Quantum
Europe R&I
Programme
Coordinated European programming logic linking Union priorities
with national quantum chapters or equivalent structured national
inputs. It does not transfer national budgetary authority to the
Union.
National quantum
chapter
Structured presentation of a Member State’s relevant priorities,
programmes, infrastructures and planned contributions for the
purposes of European coordination and review.
7
European
Quantum Science
and Technology
Excellence
Network
Distributed network of leading European quantum research
capabilities supporting shared scientific priorities, researcher
cooperation and Grand Challenges.
Quantum Grand
Challenge
Mission-driven, competitively selected research or technology
challenge with defined objectives, milestones, benchmarks and
review points.
Quantum Entry
Point / user-support
Centre
User-facing first access point helping firms, public authorities and
other users identify potential quantum applications and obtain
access to expertise, infrastructures, finance, training or suppliers.
“Think Quantum Competence Centre” may be used as the public-
facing name.
Technology and
Innovation Hub
Specialised European-level capability supporting quantum firms
through engineering, prototyping, integration, testing, validation
and qualification in a defined technology area.
Three-layer delivery
model
Functional architecture connecting: (1) scientific excellence; (2)
technology maturation and ecosystem growth; and (3) user access,
adoption and diffusion. The layers do not necessarily require
separate legal entities.
Pilot Quantum
Infrastructures
Infrastructure identified on the basis of Union added value, cross-
border relevance, technological maturity and deployment needs,
supporting the testing, demonstration or early deployment of
advanced quantum technologies. Identification does not
automatically confer funding or determine procurement or access
arrangements, which remain under the relevant programmes and
competent bodies.
Strategic Quantum
Project of European
Relevance /
Strategic Project
Project designated on the basis of transparent criteria, European
added value and measurable milestones. Designation does not
automatically confer funding, State-aid approval, procurement
preference or regulatory exemption.
Quantum
Investment Service
Desk
Coordinated scale-up finance and strategic-capability support
operating through relevant existing or future Union and national
financial instruments. Under PO1, it provides finance-readiness
and referral support. Under PO2, it combines a structured
investment pipeline, investment-readiness support, access to
appropriate financial products and private co-investment. In
justified cases, it may facilitate European co-investment or
coordinated counteroffers where loss of control could materially
affect a strategically important quantum capability. Under PO3, it
operates through a dedicated mandate or capacity within existing
or future instruments’ envelope with stronger risk-bearing
capacity. Investment, valuation and risk decisions remain with the
competent financial institutions.
Quantum Business
Platform
Voluntary digital platform supporting matchmaking among firms,
users and investors and, subject to safeguards, aggregated
ecosystem intelligence. Participation should not automatically
create regulatory obligations.
8
Minimum access
conditions / Access
Charter
Common service and access principles for supported facilities,
including transparent service catalogues, application processes,
access rules and proportionate reporting of utilisation and
outcomes.
Stage-gate modelMilestone-based progression in which continuation or additional
support depends on meeting predefined technical, operational or
deployment criteria.
Lead marketMarket in which coordinated public or private demand supports
early adoption, reference customers and progression towards
repeat deployment.
Reference
deployment
Operational or near-operational deployment intended to
demonstrate performance, provide a customer reference and
support later adoption or procurement.
Regulatory sandboxControlled framework for testing an innovative application with
the involvement of the competent sectoral authority. It does not
suspend applicable law unless an existing legal framework
expressly allows a derogation.
PCP / PPIPre-Commercial Procurement / Public Procurement of Innovative
Solutions: procurement approaches used to support development,
testing and early deployment of innovative products or services.
Monitoring and
early warning
Structured collection and analysis of indicators to identify delivery
bottlenecks, dependency exposure or supply risks and support
proportionate follow-up or mitigation.
Trusted deploymentDeployment using appropriate performance, interoperability,
security and assurance safeguards, particularly in sensitive, critical
or operational contexts.
Critical components
/ dependencies
Components, sub-components, equipment, materials, software or
services for which limited suppliers, concentration, lack of
substitution or other chokepoints may create strategic
vulnerability.
Targeted
information request
Proportionate request addressed to clearly defined actors for
information necessary for a specified monitoring or resilience
purpose and unavailable from existing sources.
Trusted partnershipInternational cooperation based on strategic value, reciprocity
where relevant, protection of Union interests, research-security
safeguards and resilient supply relationships.
Once-only principlePrinciple under which information already submitted to a
competent public authority or programme should be reused, where
lawful and technically possible, rather than requested again.
9
ANNEX 1: PROCEDURAL INFORMATION
5. LEAD DG, DECIDE PLANNING/CWP REFERENCES
The lead service for the initiative is the Directorate-General for Communications Networks,
Content and Technology, Unit C2 Quantum Technologies.
The initiative was validated in DECIDE as a politically sensitive and important new
legislative initiative requiring an impact assessment. The envisaged instrument is a proposal
for a Regulation of the European Parliament and of the Council establishing an EU Quantum
Act.
The initiative was announced in the Competitiveness Compass and constitutes the principal
legislative follow-up to the Quantum Europe Strategy, adopted by the Commission on 2 July
2025. It is included in Annex I, policy objective 3 “Research and Innovation”, of the
Commission Work Programme 2026, which lists the Quantum Act as a legislative initiative
with an indicative legal basis under Articles 173, 180 and 184 TFEU and an indicative
adoption date in the fourth quarter of 2026.
The DECIDE planning reference is PLAN/2024/2881.
As this is a new initiative, no evaluation of an existing Quantum Act was available. In
accordance with the evaluate-first principle, the assessment draws on available evaluations,
implementation evidence and administrative data concerning the relevant Union
programmes and instruments, including EuroHPC, the Chips Joint Undertaking, Horizon
Europe, the Digital Europe Programme, EuroQCI, Union financial instruments and
cybersecurity and economic-security frameworks.
6. ORGANISATION AND TIMING
The preparation of the impact assessment began in 2025. An Inter-Service Group was
established under the coordination of DG CNECT.
The services involved included the Secretariat-General, the Legal Service, DG BUDG, DG
COMP, DG DEFIS, DG FISMA, DG GROW, DG HOME, DG REGIO, DG RTD, DG
SANTE, DG TRADE and the Joint Research Centre. DG ENER, DG HR and other services
were consulted where their responsibilities were directly relevant to particular measures or
impacts.
The first Inter-Service Group meeting took place on 24 September 2025. The Group was
subsequently consulted through meetings, written exchanges and review of the consultation
material, evidence-gathering activities, intervention logic, policy measures, cost
assumptions and draft Impact Assessment Report.
The draft Impact Assessment and policy options were presented to the Inter-Service Group
on 17 July 2026. The draft minutes and the consolidated Impact Assessment Report were
circulated for written comments on 22 July 2026, with a deadline of 10 August 2026.
Comments received through the Inter-Service Group were assessed and reflected in the
package before submission to the Regulatory Scrutiny Board.
6.0. CONSULTATION ARRANGEMENTS
An exception from the standard twelve-week public-consultation process was approved by
the Secretariat-General. The consultation strategy combined:
• a four-week Call for Evidence;
• targeted consultations with Member States, industry, research organisations,
infrastructure operators, financial actors, public users and technical experts;
10
• interviews, surveys and evidence-gathering activities conducted as part of the
external support study; and
• stakeholder contributions and position papers submitted outside the Have Your Say
portal.
The English-language Call for Evidence opened on 29 October 2025 and closed on 26
November 2025. Translated language versions remained open until 17 December 2025.
The shortened consultation approach reflected the technical and specialised nature of the
initiative and the need to obtain detailed input from the organisations directly involved in
quantum research, industrialisation, deployment, finance, standardisation, cybersecurity and
supply chains. The approved exception and the measures taken to ensure transparency,
accessibility and representation are further described in Annex 2.
The exception was approved by the Secretariat-General on the 7th of March 2025.
6.1. PRINCIPAL PROCEDURAL MILESTONES
Milestone Date
Establishment and first meeting of the Inter-Service Group 24 September 2025
Opening of the Call for Evidence 29 October 2025
Closure of the Call for Evidence 15 December 2025
Inter-Service Group meeting on the draft IA 17 July 2026
Circulation of the draft IA and minutes for written comments 22 July 2026
Deadline for Inter-Service Group written comments 10 August 2026
Submission of the draft IA to the Regulatory Scrutiny Board 03 September 2026
Regulatory Scrutiny Board meeting 23 September 2026
Regulatory Scrutiny Board opinion (Ref.
Ares(2026)9080263) 25 September 2026
Table 1.1. Principal procedural measures
The Regulatory Scrutiny Board dates are those recorded in the Board's opinion (meeting of
23 September 2026; opinion signed on 25 September 2026).
7. CONSULTATION OF THE REGULATORY SCRUTINY BOARD
The draft Impact Assessment Report, its executive summary, the public annexes, the minutes
of the final Inter-Service Group meeting and the relevant underlying analytical material
were submitted to the Regulatory Scrutiny Board.
Where necessary, commercially confidential or security-sensitive supporting evidence were
transmitted separately through an appropriate secure channel.
The Board met on 23 September 2026 and delivered a positive opinion with reservations
on 25 September 2026.
Table 1.2 sets out how the Board’s recommendations have been addressed in the Impact
Assessment Report and its annexes.
Board
recommendation
Changes made Location
C(1) Problem and
drivers: comparative
analysis of main
competitors; evolution
and maturity of
quantum domains;
drivers of the scale-up
The updated problem definition compares the
EU with its main competitors, in particular the
US and China, on public support, private
financing and recent policy measures. It sets out
the technological and market maturity of each
quantum domain and its expected evolution,
with firm-level evidence on commercialisation
Main Report: Sections 1.1 (Table
1.1), 2.1 (Table 2.1), 2.3, 2.4, 3.2
and 3.3
Annex 7: From lab to fab (Figure
7.3)
Annex 11: Tables 11.1–11.21
11
gap and scope for
public intervention
and on the later-stage financing gap that limits
scale-up. The updated problem drivers identify
the market and coordination failures that justify
public intervention, such as information
asymmetry in later-stage finance and the first-
buyer and security externalities, and the extent
to which existing instruments address them.
Annex 7 now explains better the maturity, the
lab-to-fab gap and stage gates; Annex 11
provides the supporting data.
C(2) Dynamic
baseline: all relevant
national and EU
measures; future
technological
developments, in
particular AI
The dynamic baseline covers the actions under
the Quantum Europe Strategy, recent and
forthcoming horizontal initiatives, and national
strategies, programmes and infrastructures
adopted or sufficiently advanced, as illustrated
for France and the Netherlands. Initiatives
proposed or adopted up to 30 September 2026
are considered qualitatively. Interactions with
enabling technologies, in particular AI, are
assessed, and the expected developments and
residual gaps are set out by intervention
dimension. Only effects additional to the
baseline are attributed to the options; a stronger
baseline and lower and higher participation are
tested in the sensitivity analysis.
Main Report: Sections 5.1.1 and
5.1.2 (Table 5.1)
Annex 4 Part A: Dynamic baseline
and attribution; Analytical
boundary and treatment of the
baseline
Annex 4 Part C: Table 4.27
Annex 9: Purpose and scope
C(3) Coherence and
synergies with the
European Innovation
Act, the Public
Procurement Act,
Chips Act 2 and the
ERA Act
The four initiatives are mapped, together with
the Cloud and AI Development Act, EU Inc.
and STEP, among the existing Union
instruments, with the division of functions: they
improve the general conditions for innovation,
procurement, R&I coordination and
semiconductor and digital infrastructure, but do
not provide an integrated quantum-specific
approach. Their expected effects form part of
the dynamic baseline and are not attributed to
the Quantum Act. For each initiative, Annex 9
sets out the residual issue, the complementary
measures (PM7 for innovation procurement;
PM1–PM3 and PM9 for R&I coordination;
PM4–PM6 for semiconductor, cloud and AI
capabilities) and the non-duplication safeguard.
Main Report: Sections 1.2 (Table
1.2) and 5.1 (Table 5.1)
Annex 9: Table 9.1; Interfaces
requiring coordinated
implementation
C(4) Pathways,
bottlenecks and
milestones; roles and
responsibilities;
synergies between
PM3, PM5 and PM7
and between the
support structures
PM4, PM6, PM10,
PM12 and PM16;
one-stop shop; reuse
of existing structures
Each measure is now better described with its
content, the bodies responsible and its links to
other measures. Grand Challenges (PM3) target
key technological and engineering bottlenecks,
with measurable objectives, milestones and
stage gates. Figure 5.2 and the accompanying
text set out the pathway from research to
adoption and the synergies along the innovation
chain (PM3, PM5, PM7) and between the
support structures. The Centres (PM6) are the
first entry point for users in each Member State
and refer them to infrastructures, the Hubs
(PM4), financing, including through the
Investment Service Desk (PM10), skills and
procurement opportunities; the Business
Platform (PM12) connects with the Centres and
the Service Desk, and the Alliance (PM16) is
linked to the Quantum Strategy Board.
Implementation relies on existing bodies, with
no new Union body or agency, and the
Commission’s role is set out by function.
Main Report: Sections 5.2.2
(Figure 5.2), 5.2.6 and 7.4
Annex 4: Tables 4.4–4.6; Table
4.15
Annex 7: Stage-gates (Figure 7.3)
Annex 8: Tables 8.1 and 8.12
Annex 9: Interfaces requiring
coordinated implementation
12
C(5) Substantiate
assumptions that are
not self-explanatory
(e.g. the voluntary
participation share);
report cost and saving
calculations in
sufficient detail
Each material assumption is now registered with
its definition, denominator, low, central and
high values, source and use, including the 55%
voluntary-participation share and the 64%
coordination-adoption share. Commission and
Member State staffing is set out by option, and
Commission staffing by measure and by
function, with the basis of each estimate. Every
monetised saving line is shown with its
calculation and a worked example, and every
cost line is calculated by option and reconciled
with the totals and with the distribution by
bearer. The material assumptions, including the
participation shares, are tested through scenario,
switching-value and probabilistic analysis.
Annex 4 Part B: Tables 4.7–4.18
Annex 4 Part C: Tables 4.19–4.30
Annex 3: Tables 3.3 and 3.4
Table 1.2. How the Board’s recommendations have been addressed
8. EVIDENCE, SOURCES AND QUALITY
The Impact Assessment draws on five principal categories of evidence:
1. Stakeholder consultation evidence, including the Call for Evidence, targeted
consultations, interviews, workshops, surveys and position papers. The consultation
methodology and results are presented in Annex 2.
2. External analytical support, including the study undertaken by PPMI/d-fine in
support of the Quantum Act Impact Assessment. The study provided evidence and
analytical support concerning the quantum ecosystem, infrastructures, investment,
procurement, skills, standards, supply chains and policy impacts.
3. Union and national administrative and programme data, including information
from Horizon Europe, the Digital Europe Programme, EuroHPC, the Chips Joint
Undertaking, EuroQCI, relevant financial instruments and Member State strategies
and programmes.
4. Targeted Commission-services analysis, including mapping of infrastructures,
firms, financing rounds, procurement and deployment schemes, standardisation
activities, skills, critical components and documented supply-chain effects.
5. Published research and market evidence, including the Quantum Europe Strategy,
the Strategic Research and Industry Agenda 2030, JRC, OECD/EPO and EIB
analyses, academic literature and market-monitoring sources.
The Cost-Benefit Analysis (CBA) workbook provides the quantitative basis for the Main
Report and Annexes 3, 4 and 8. The model uses real 2024 prices, a 3% real discount rate
and a 2028–2037 assessment period. It distinguishes societal resource costs, administrative
burdens, budget appropriations, programme envelopes and transfers and scenario-only
effects to avoid double counting.
The evidence was triangulated across sources wherever possible. The assessment
distinguishes between:
• observed data;
• stakeholder evidence;
• proxies;
• modelling assumptions;
• illustrative scenarios; and
• analytical judgements.
Evidence quality differs across the quantum domains. Company, investment and
procurement databases are not exhaustive; infrastructure-access information does not
necessarily measure actual utilisation or available capacity; standardisation activity includes
13
both published standards and work in progress; and supplier and dependency information
may be incomplete or commercially sensitive.
The Impact Assessment therefore avoids aggregating datasets with different scopes and
reference periods and does not present scenario estimates as forecasts. Low, central and high
assumptions are used where robust point estimates are unavailable. Detailed methodologies,
formulas, assumptions, limitations and sensitivity analysis are presented in Annex 4 and in
the supporting calculation workbook. Structure of the Impact Assessment documentation
The Impact Assessment package comprises two substantive public Staff Working
Documents, a separate executive-summary Staff Working Document, two supporting
analytical workbooks and one restricted evidence pack.
Document Status Content
Quantum Act IA – Executive
Summary
Normal/public Reader-friendly summary of the problem, objectives,
options, principal impacts, preferred option and
monitoring arrangements.
Quantum Act IA – Main
Report
Normal/public Problems, objectives, options, impacts, comparison,
preferred option and monitoring.
Quantum Act IA – Annexes Normal/public Annexes 1–10: procedural information; stakeholder
consultation; who is affected and how; analytical
methods and cost model; competitiveness check; SME
check; key technical concepts; detailed implementation
and impacts; coherence with existing EU legislation
and initiatives; monitoring and evaluation framework.
Quantum datasets workbook Supporting
analytical file /
Annex 11
Datasets supporting the problem definition, dynamic
baseline and impact analysis, with stable worksheet
names or identifiers used in the public documents.
Restricted Evidence Pack Limited circulation Commercially confidential, company-level, supplier-
level or security-sensitive supporting evidence
transmitted through an appropriate secure channel.
Table 1.3. Document packages description
Annex numbering runs continuously across the public annex documents. Annexes 1–10
appear in the document titled “Annexes”. The supporting quantum datasets constitute Annex
11.
The Restricted Evidence Pack is not part of the public Staff Working Documents. It contains
only evidence whose disclosure could prejudice commercial interests, reveal security-
sensitive supply-chain information, identify confidential consultation participants or
undermine the purpose of the analysis.
The public documents present aggregated findings, methodologies, limitations and
sufficient information to understand how restricted evidence was used. References to
restricted material use stable evidence identifiers without reproducing confidential content.
Access is limited to authorised Commission services and, where required for scrutiny, the
Regulatory Scrutiny Board.
14
ANNEX 2: STAKEHOLDER CONSULTATION (SYNOPSIS REPORT)
9. PURPOSE AND CONSULTATION OBJECTIVES
This annex summarises the stakeholder consultation activities conducted in preparation of
the Impact Assessment for the EU Quantum Act. It describes the consultation strategy,
participants and analytical methods; presents the principal findings and divergent views; and
explains how the evidence influenced the problem definition, policy options and design of
the preferred option.
The consultation sought to:
• test the Commission’s understanding of the problems affecting the European
quantum ecosystem;
• collect evidence on fragmentation, lab-to-fab barriers, infrastructure access, scale-
up finance, demand, skills, standards, quantum-safe preparedness and strategic
dependencies;
• assess the feasibility, expected benefits, costs and risks of possible Union action;
• identify differences between quantum-computing, communication, sensing and
enabling-technology ecosystems;
• examine the appropriate balance between voluntary coordination and targeted
obligations; and
• identify proposals that should not be pursued because of insufficient evidence,
disproportionate burdens, overlap with existing instruments or legal and
implementation constraints.
Stakeholder evidence informed the Impact Assessment but was not treated as a
representative opinion poll. Consultation findings were assessed together with programme
data, market and company mappings, infrastructure and supply-chain evidence, published
research and Commission-services analysis.
10. CONSULTATION STRATEGY AND ACTIVITIES
10.0. CONSULTATION APPROACH AND MINIMUM STANDARDS
An exception from the standard twelve-week public-consultation process was approved by
the Secretariat-General. The consultation strategy combined a four-week Call for Evidence
with targeted interviews, an industry survey, exchanges with Member States and
stakeholders, and the analysis of position papers.
This approach reflected the specialised and partly pre-commercial nature of quantum
technologies. Many of the relevant questions concerned technical infrastructure, investment,
procurement, standards, cryptographic migration and commercially sensitive supply chains.
Targeted activities were therefore necessary to complement the open feedback mechanism
and obtain sufficiently detailed operational evidence.
The main Better Regulation consultation principles were respected:
• transparency: the Call for Evidence explained the problems, possible measures,
expected impacts and consultation approach;
• accessibility: the Call for Evidence was published through the Have Your Say portal
and made available in the Union’s official languages;
• openness: individuals and organisations could submit feedback and supporting
documents;
• targeted coverage: specific outreach was undertaken to industry, SMEs, research
organisations, Member States, infrastructure operators, investors, standards
organisations and implementing bodies;
15
• data protection and confidentiality: publication choices were respected, interview
transcripts were anonymised and commercially sensitive information was
aggregated; and
• feedback: the principal consultation findings and their use in policy design are
explained in this annex and reflected in the Impact Assessment Report.
The English-language Call for Evidence opened on 29 October 2025 and closed on 26
November 2025. Translated versions remained open until 17 December 2025.
10.1. OVERVIEW OF CONSULTATION ACTIVITIES
Activity Participation Timing Principal purpose
Call for
Evidence
228 inputs: 216 portal
submissions and 12 additional
papers
29 October–
17 December
2025
Test the problem definition, possible
measures and impacts; receive
supporting evidence and position
papers
Targeted
interviews
32 interviews from 74 invitations 2 February–24
March 2026
Explore problem drivers,
implementation constraints, costs,
risks and policy design
Industry
survey
41 responses from 418
invitations
25 February–
16 March
2026
Gather structured evidence from
companies on financing,
infrastructure, demand, dependencies
and possible measures
Member
State
engagement
Five Member State authorities
interviewed, complemented by
exchanges through established
quantum-policy and programme
channels
2025–2026 Test subsidiarity, governance,
national-programme interaction and
implementation feasibility
Stakeholder
and expert
exchanges
Industry, research,
infrastructure, cybersecurity,
finance and standards
stakeholders
2025–2026 Validate specific measures and
evidence, including PQC, standards,
procurement and supply-chain
resilience
Targeted/ad
hoc
technical
contribution
European Patent Office March-15 July
2026
The European Patent Office provided
an ad hoc technical contribution on
the quantum patent landscape.
Table 2.1. Consultation activities
10.2. PARTICIPANTS AND ANALYTICAL METHODOLOGY
10.2.1. Call for Evidence participants
The Call for Evidence dataset contains 228 inputs. Of these, 132 included an attachment.
Twenty-nine substantive position papers were extracted for a separate attachment-level
qualitative review after quality-control and de-duplication.
Portal categories were consolidated for analytical presentation. The original labels do not
always identify the substantive interest represented: for example, some individuals
submitted contributions on behalf of companies, research bodies or other organisations.
Stakeholder category Number of inputs Share
Businesses 56 24.6%
Business and industry associations 24 10.5%
Academic and research organisations 44 19.3%
Citizens 52 22.8%
NGOs, civil-society organisations and trade unions 20 8.8%
16
Public authorities 8 3.5%
Other, including networks and technical organisations 24 10.5%
Total 228 100%
Table 2.2. Call for Evidence respondents by consolidated category. Commission-services analysis of the Call
for Evidence classification dataset. Categories have been consolidated from the original Have Your Say
classifications.
Of the 228 submissions, 197 originated in the EU, 30 outside the EU and one did not identify
a country. The highest numbers of contributions came from Germany (44), Italy (26), France
(22), Belgium (18), the Netherlands (17), Spain and the United States (12 each), and Austria
(11). The geographic distribution reflects the concentration of existing quantum ecosystems
and active stakeholder networks and should not be interpreted as representative of
population or market size.
No mass-response campaign was identified. The dataset included some coordinated
contributions and cases where the same or substantially similar supporting document was
submitted by more than one respondent. Individual submissions were retained in the
participation counts, while identical or near-identical attachments were counted once in the
attachment-level qualitative synthesis to avoid double weighting.
10.3. TARGETED INTERVIEWS
The external study conducted 32 semi-structured interviews.
Stakeholder group Interviews
Member State authorities 5
EU bodies or EU-supported programmes 4
Industry representatives 10
Industry associations 4
Research and academic organisations 4
Standards organisations 2
Investors 3
Total 32
Table 2.3. Interviews by stakeholder group
Before each interview, participants received a topic note aligned with the intervention logic.
Interviews covered governance, infrastructure, financing, market uptake, skills, standards,
supply chains, expected impacts, costs and monitoring indicators.
Transcripts were anonymised and coded using a common taxonomy covering:
• fragmentation of governance and funding;
• lab-to-fab and infrastructure-access bottlenecks;
• scale-up investment and de-risking;
• demand, procurement, standards and user support;
• strategic dependencies and leakage risks;
• skills and uneven access;
• proposed policy measures;
• expected positive and negative impacts; and
• monitoring indicators.
Digital tools were used to support the organisation and comparison of coded material. All
coding, interpretation and synthesis were reviewed by the study team.
17
10.4. INDUSTRY SURVEY
The survey received 41 responses from organisations in 13 Member States. Thirty-three
responses, or approximately 80%, came from micro, small or medium-sized organisations.
Organisation size Responses
Micro, 1–9 employees 12
Small, 10–49 employees 14
Medium, 50–250 employees 7
Large, 250–999 employees 4
Very large or global enterprise 3
Other 1
Total 41
Table 2.4. Survey respondents by organisation size
Germany accounted for 13 responses, France and the Netherlands for five each, Finland for
three, and Austria, Denmark, Ireland, Italy, Romania and Sweden for two each. Croatia,
Slovenia and Spain accounted for one response each. Closed questions were analysed
quantitatively. Open answers were coded using the same broad taxonomy as the interview
material, allowing comparison between consultation channels.
10.5. CALL FOR EVIDENCE CLASSIFICATION
Call for Evidence inputs were classified through a multi-tag taxonomy covering policy
pillars, policy areas, instruments, value-chain stages, application sectors and impact
dimensions. Each contribution could receive several tags.
Policy area Inputs tagged
Funding and grants 205
Infrastructure, testbeds and pilots 157
Market creation and procurement 134
Supply chains, resilience and economic security 125
Governance and coordination 119
International cooperation 107
Investment and finance 97
Security, cryptography and cybersecurity 97
Standards, certification and interoperability 92
Skills, education and mobility 85
Table 2.5. Most frequent policy-area tags in Call for Evidence inputs. Source: Call for Evidence
classification dataset.
Because multiple tags could be assigned to a contribution, the figures are not additive and
do not constitute votes in favour of particular measures. They indicate the prevalence of
issues discussed.
10.6. TARGETED/AD HOC TECHNICAL CONTRIBUTIONS
The European Patent Office provided an ad hoc technical contribution on the quantum patent
landscape, dated 15 July 2026. The contribution informed the assessment of scale-up and
value-capture conditions, patent intelligence, finance readiness and participation in
standardisation. It was treated as technical evidence rather than as an expression of
stakeholder preference between policy options.
18
The High-Level Board on Quantum Technologies supported a lifecycle approach linking
scientific excellence, technology maturation, infrastructure access, procurement,
deployment and scale-up finance. It recommended milestone-based Grand Challenges, a
limited number of specialised Innovation Hubs connected to distributed competence or
access points, stronger first-buyer pathways and safeguards against forced SME consortia
or unnecessary disclosure of commercially sensitive information. These recommendations
informed the detailed PO2 design. Its stronger proposals dedicated risk-bearing investment
capacity, stronger strategic procurement conditions, targeted mandatory assurance, wider
targeted dependency information requirements and binding PQC-preparedness duties for
defined critical actors were considered through PO3.1
10.7. LIMITATIONS
The consultation evidence has several limitations:
• participation was voluntary and self-selected;
• the Call for Evidence did not use a structured questionnaire;
• some stakeholder categories and Member States were more strongly represented than
others;
• the industry survey had 41 responses and was not statistically representative;
• interview participants were purposively selected for expertise rather than randomly
sampled;
• contributions differed significantly in length and level of detail;
• organised stakeholders generally had greater capacity to submit detailed position
papers;
• commercially sensitive information could not always be reproduced in the public
analysis; and
• frequency of mention does not indicate the economic importance of an issue or
support for a specific policy instrument.
The consultation findings were therefore used primarily to identify issues, test causal
mechanisms, understand implementation constraints and capture divergent positions.
Quantitative problem indicators and impact estimates were derived from the wider evidence
base.
11. PRINCIPAL CONSULTATION FINDINGS
11.0. OVERVIEW
The different consultation channels broadly confirmed three structural problems, which are
detailed in Chapter 2 of the Impact Assessment:
1. slow conversion of research excellence into deployable technologies;
2. insufficient conditions for firms to scale and for early markets to develop; and
3. strategic dependencies and insufficient resilience.
They also supported the seven drivers identified in the main report: insufficient strategic
alignment, uneven access to industrialisation infrastructure, skills gaps, financing
discontinuities, weak demand pull, incomplete standards and assurance pathways, and
limited visibility of dependencies.
Theme Interviews Industry survey
Governance or institutional design 32/32 —
Lack of EU–Member State coordination 30/32 16/41
1 Draft Second Report on Quantum Act Priorities, July 2026, produced by the Top-Level Specialists in
Quantum Technologies Commission expert group.
19
Funding instruments and financial mechanisms 29/32 20/41
Lack of strategic EU-level priorities 25/32 —
Dependence on non-EU suppliers 24/32 20/41
Absence of late-stage capital 23/32 27/41
Positive effects expected from stronger coordination 22/32 —
Risks or negative impacts from stronger intervention 21/32 —
Insufficient or inefficient public funding 21/32 8/41
Procurement and demand-side measures 20/32 10/41
Lack of de-risking mechanisms — 19/41
Skills and workforce constraints — 19/41
Infrastructure development and access — 10/41
Lack of accessible testbeds or pilot lines — 9/41
Table 2.6. Selected quantitative findings from targeted consultation. Source: PPMI/d-fine interview and
survey coding. A respondent could be coded under several themes.
11.1. COMPARISON ACROSS CONSULTATION CHANNELS
Theme Common finding
across channels
Complementary evidence Main divergence
Coordination Fragmented EU and
national action limits
scale and coherence
Interviews provided
examples of parallel
planning and unclear
institutional interfaces
Dedicated institution versus
coordination through existing
structures
Lab-to-fab and
access
Firms, particularly
SMEs, face access and
qualification barriers
Interviews identified
contractual, cost and facility-
design problems
Some survey respondents
considered existing capacity
sufficient in their domain
Finance Growth-stage capital
and financing
continuity are
insufficient
Investors explained lead-
investor, valuation and
public-private risk-sharing
issues
Dedicated quantum fund
versus thematic use of existing
instruments
Demand Public procurement
can create reference
markets and early
revenues
National procurement
examples illustrated possible
delivery models
General “Buy European”
preference versus open, risk-
based procurement
Standards and
trust
Common benchmarks
and testing references
would support uptake
Standards organisations
identified sequencing and
measurement requirements
Horizontal certification versus
maturity-dependent targeted
assurance
PQC Coordinated
preparation and
technical support are
needed
Cybersecurity actors stressed
links with existing EU
frameworks
Broad support for technical
coordination; divergent views
on binding planning or
procurement obligations.
Dependencies Better visibility and
mitigation of critical
dependencies are
needed
Industry identified
component categories and
qualification constraints
Strategic autonomy through
restrictions versus openness
and diversification
Skills Industrial, engineering
and user-side skills
require attention
SMEs stressed practical
recruitment and training
barriers
Broad educational or visa
measures versus targeted
deployment-linked action
Table 2.7. Consistency, complementarity and divergence
20
11.2. FEEDBACK AND FUTURE USE OF CONSULTATION EVIDENCE
The consultation results have been incorporated into the problem definition, option design,
impact assessment, SME analysis, competitiveness check and monitoring framework.
Following adoption of the initiative, the synopsis report will be published with the Impact
Assessment. Contributions submitted through the Have Your Say portal remain available in
accordance with respondents’ publication choices and applicable data-protection rules.
Monitoring will continue to involve Member States, industry, research organisations,
infrastructure operators, investors, standards bodies, buyers and users. The first
implementation review will assess whether the measures address the practical barriers
identified during consultation and whether the reporting, access, funding and procurement
arrangements create unintended or disproportionate burdens, particularly for SMEs and
smaller public administrations.
21
ANNEX 3: WHO IS AFFECTED AND HOW?
12. PRACTICAL IMPLICATIONS OF THE INITIATIVE
The preferred option primarily affects the Commission, Member States, Union
implementing bodies, designated or Union-supported infrastructures and projects, and
businesses participating in support, procurement or project activities.
Most obligations fall on public authorities, implementing bodies and actors receiving or
applying for support. For businesses, participation in most measures is voluntary. Binding
requirements are limited to clearly defined cases, notably reporting or information
obligations linked to supported activities, designated projects, supported procurement or
targeted strategic-intelligence requests. The initiative does not impose direct obligations on
citizens or consumers.
The preferred option is therefore expected to generate mainly administrative and
implementation costs for public authorities and implementing bodies, while business-facing
costs are concentrated on applicants, beneficiaries and other directly participating actors.
Around 65% of the modelled PO2 societal costs fall on Commission/Union services and
Member State authorities; including implementing bodies, facility operators and
Commission-financed experts, around 92% falls on the public and implementation side.
Stakeholder group Main practical implications
Commission and
Union services
Operate the Quantum Strategy Board and common programming/review cycle;
coordinate Strategic Projects, infrastructure, finance, procurement, standards,
strategic intelligence and monitoring; maintain common methods, templates and
data systems.
Member State
authorities and
public buyers
Participate in governance and programming; contribute to national quantum
planning and implementation; cooperate on procurement, skills, PQC and
resilience; provide information for the biennial PQC preparedness assessment,
take part in coordinated PQC exercises and apply PQC requirements in public
procurement; provide proportionate information where required.
Implementing
bodies, Joint
Undertakings and
agencies
Administer relevant calls, access arrangements and projects; support
implementation and monitoring; assess milestones and coordinate with the
Commission and Member States within their existing mandates.
Infrastructure and
Centre operators
Provide additional access, user-support, testing, validation and referral services
where selected or supported; adapt existing services where necessary.
Businesses, including
start-ups and SMEs
Mainly voluntary participation in funding, infrastructure access, finance,
procurement, standards, matchmaking and support measures. Targeted
information obligations may apply to beneficiaries, designated projects or actors
in clearly defined critical categories; suppliers bidding in public procurement that
sets PQC requirements provide evidence of compliance.
Investors and
financial institutions
Participate voluntarily in investment-readiness, syndication and financing
activities; individual investment and due-diligence decisions remain with the
competent institutions and investors.
Citizens and
consumers
No direct administrative or compliance obligations. Potential benefits are indirect
and depend on successful future deployment of quantum technologies.
Table 3.1. Practical implications by stakeholder group
The existing analysis already identifies these actor groups and distinguishes business
participation from public-sector implementation responsibilities.
13. SUMMARY OF COSTS AND BENEFITS
The preferred option is expected to generate direct administrative and transaction-cost
savings and wider benefits through improved coordination, infrastructure access, financing
continuity, demand formation, standards and assurance, skills and supply-chain resilience.
22
Only benefits supported by sufficiently explicit causal mechanisms and data are monetised.
Wider effects on industrial capacity, innovation, firm growth, employment, productivity,
resilience and security are assessed qualitatively or through scenarios and are not aggregated
into a single monetary benefit estimate. This avoids double counting and reflects the
substantial uncertainty surrounding the development and uptake of quantum technologies.
I. Overview of Benefits (total for all provisions) – Preferred Option
Description Amount Comments
Direct benefits
Administrative and
transaction-cost
savings
EUR 13.59
million NPV
Modelled time and transaction-cost savings under PO2 comprise approximately EUR
6.86 million for Member State authorities, EUR 6.45 million for businesses and EUR
0.27 million for implementing bodies.
Improved
infrastructure access
Not robustly
monetisable
Common access arrangements, referrals and user support may reduce search,
negotiation and waiting costs and accelerate access to engineering, testing, validation
and qualification. Illustrative scenarios are reported separately and are not added to
the monetised total.
Improved access to
scale-up finance
Not robustly
monetisable
Better investment readiness, referrals and cross-border syndication may improve
financing continuity. Financing volumes are treated as activity indicators, not welfare
benefits.
Improved demand and
first-buyer pathways
Not robustly
monetisable
Coordinated innovation procurement and reference deployments may generate earlier
revenues, customer validation and stronger investor confidence. Effects depend on
buyer participation and technological maturity.
Indirect benefits
Industrial capability
and innovation
Not robustly
monetisable
Improved continuity from research to industrial validation and deployment may
strengthen European industrial capacity and value capture.
Standards,
benchmarking and
trusted deployment
Not robustly
monetisable
Common terminology, benchmarks, test methods and interoperability profiles may
reduce repeated due diligence and improve comparability and trust.
Skills and user
capability
Not robustly
monetisable
Training, mobility and user-support measures may improve availability of technical,
industrial and deployment skills.
Supply-chain
resilience
Not robustly
monetisable
Earlier identification of dependencies and support for diversification and supplier
qualification may reduce disruption risks and technical lock-in.
Wider societal benefits Not robustly
monetisable
Potential benefits in areas such as health, energy, security, navigation and
environmental monitoring depend on the successful development and deployment of
specific quantum applications and cannot be attributed fully to the Act.
Table 3.2. Overview of benefits (preferred option)
The EUR 13.59 million total is the modelled monetised saving for PO2; the wider benefit channels are already set
out in the existing Annex 5 analysis.
II. Overview of costs – Preferred option (PO2), EUR million, net present value 2028–2037
Citizens/Consumers Businesses Administrations
One-off Recurrent One-off Recurrent One-off Recurrent
Action (a): conditions
attached to Union
funding (PM1b project
metadata; PM3b stage-
gate reporting)
Direct
administrative
costs
Not
applicable
Not
applicable 0.20 1.89
Not
applicable
Not
applicable
Action (b): Strategic
Project designation
(PM5b applications,
reporting and
safeguards)
Direct
administrative
costs
Not
applicable
Not
applicable
Not
applicable 0.92
Not
applicable
Not
applicable
23
Action (c): supported
innovation
procurement and PQC
requirements in public
procurement (PM7b
documentation of
origin by bidders;
PM13b evidence of
PQC compliance)
Direct
administrative
costs
Not
applicable
Not
applicable
Not
applicable 1.29
Not
applicable
Not
applicable
Action (d): targeted
information requests
(PM11b dependency
information)
Direct
administrative
costs
Not
applicable
Not
applicable 0.05 0.43
Not
applicable
Not
applicable
Action (e): taking part
in regulatory
sandboxes, the
business platform or
investment support
(PM6b, PM12b,
PM10b)
Direct
administrative
costs (sandbox
participation;
platform
onboarding;
documentation
for investment
transactions)
Not
applicable
Not
applicable 0.04 0.68
Not
applicable
Not
applicable
Action (f):
governance,
programming,
monitoring and
enforcement by public
authorities (all
measures)
Direct
administrative
costs (Member
State authorities
26.06;
implementing
bodies 1.60)
Not
applicable
Not
applicable
Not
applicable
Not
applicable 1.08 26.59
Direct
enforcement
costs
(Commission
3.98; Member
State authorities
1.35)
Not
applicable
Not
applicable
Not
applicable
Not
applicable
Not
applicable 5.33
Direct
enforcement
costs:
implementation
(Commission
administration
25.65;
Commission
non-staff
resources 8.44;
implementing-
body delivery
4.67; external
experts 0.55)
Not
applicable
Not
applicable
Not
applicable
Not
applicable 4.67 34.63
Action (g): Hub and
Centre services
(PM4b, PM6b;
existing, publicly
funded operators)
Direct
enforcement
costs:
implementation
(Centre
adaptation; hub
services)
Not
applicable
Not
applicable
Not
applicable
Not
applicable 4.37 17.04
24
Action (h): measures
that Member States
may opt into (PM7b
joint innovation
procurement; PM13b
PQC expert support)
Direct
enforcement
costs:
implementation
by Member State
authorities
Not
applicable
Not
applicable
Not
applicable
Not
applicable
Not
applicable 3.40
Other: participation by
firms without a legal
requirement (PM16b
Alliance input; PM8b
standards, testing and
advisory work; PM12b
platform input and
matchmaking; PM13b
expert time)
Not a
compliance cost;
part of the
societal cost
Not
applicable
Not
applicable
Not
applicable 3.33
Not
applicable
Not
applicable
Total (EUR 105.92
million) All cost types
Not
applicable
Not
applicable 0.29 8.54 10.12 86.97
Memorandum: transfers (not included
above)
Programme expenditure, grants, procurement contracts and financial-instrument
capital are transfers. Indicative Union programme resources for 2028–2034: EUR
5.19–6.12 billion, nominal (Annex 4, Part D).
Table 3.3. Overview of costs – Preferred option
The table above sets out the full incremental costs of the preferred option by actor and action.
Detailed calculations, assumptions, affected populations, unit costs and sensitivity ranges
are provided in Annex 4. Programme expenditure, grants, procurement expenditure and
financial-instrument capital are transfers; they are reported separately (Annex 4, Part D) and
are not included in the costs above.2
Values are central net present values for 2028–2037 (EUR million; 3% discount rate; base
year 2028). The rows add up to the total societal cost of PO2 (EUR 105.92 million): EUR
8.83 million for businesses and EUR 97.09 million for administrations, which cover the
Commission, Member State authorities, implementing bodies, Commission-financed
external experts and the existing Hub and Centre operators; these operators are publicly
funded. Business administrative costs (EUR 5.50 million) arise only where a firm receives
Union funding (EUR 2.10 million: PM1b project metadata from 180 funded beneficiaries,
EUR 1.91 million including a one-off set-up of EUR 0.20 million; PM3b stage-gate
reporting by 15 funded consortia, EUR 0.19 million), seeks designation as a Strategic Project
(EUR 0.92 million: applications EUR 0.33 million, reporting EUR 0.48 million, safeguards
EUR 0.10 million), bids in supported innovation procurement (EUR 0.07 million) or in
public procurement that sets PQC requirements (EUR 1.23 million), receives a targeted
information request on dependencies (EUR 0.48 million) or takes part in a regulatory
sandbox, the business platform or investment support (EUR 0.72 million: sandbox
participation EUR 0.64 million, platform onboarding EUR 0.04 million, documentation for
investment transactions EUR 0.05 million). EUR 5.46 million of these costs fall within One-
In, One-Out (Table 3.4); the documentation for investment support is an application for
financial support and is not offset (Tool #58, Box 4). The one-off business cost is EUR 0.29
2 Central estimates, real 2024 prices, 2028–2037. The business administrative-cost total is EUR 5.50 million
NPV (EUR 5.46 million within One-in, One-out), including EUR 0.29 million NPV in one-off administrative
burden. The administration figures comprise Member State/public-administration and implementing-body
administrative costs. The administrations' columns cover the Commission, Member State authorities,
implementing bodies, Commission-financed external experts and the existing Hub and Centre operators, which
are publicly funded. Small differences may arise from rounding. Total societal cost under PO2 is EUR 105.92
million NPV. Programme expenditure, grants, procurement expenditure and financial-instrument capital are
reported separately and are not included as regulatory compliance costs.
25
million NPV (EUR 0.30 million nominal). Commission administration and resources,
implementing-body delivery, experts, the Hub and Centre resources and the effort of
Member State authorities in measures that the act enables but does not require (EUR 3.40
million) are implementation costs, shown as enforcement costs. Time that firms choose to
spend in the new structures without any legal requirement (EUR 3.33 million) is not a
compliance cost; it is shown separately because it is part of the societal cost. PO2 creates no
adjustment costs and no regulatory fees or charges. Small differences are due to rounding.
Calculations are set out in Annex 4.
III. Application of the ‘one in, one out’ approach – Preferred option
[M€]
One-off
(annualised total net present
value over the relevant period)
Recurrent
(nominal values per year)
Total
Businesses
New administrative
burdens (INs) 0.033 0.663 0.696
Removed administrative
burdens (OUTs) 0 0 0
Net administrative
burdens* 0.033 0.663 0.696
Adjustment costs**0 0
Citizens
New administrative
burdens (INs) 0 0 0
Removed administrative
burdens (OUTs) 0 0 0
Net administrative
burdens* 0 0 0
Adjustment costs**0 0
Total administrative
burdens*** 0.033 0.663 0.696
Table 3.4. Application of the ‘one in, one out’ approach – Preferred option
(*) Net administrative burdens = INs – OUTs;
(**) Adjustment costs falling under the scope of the OIOO approach are the same as reported in Table II above. Non-
annualised values;
(***) Total administrative burdens = Net administrative burdens for businesses + net administrative burdens for
citizens.
The figures are central estimates. Detailed calculations and assumptions are provided in Annex 4
The preferred option introduces a limited amount of new administrative burden for
businesses. These burdens arise from information obligations that apply only to firms that
receive Union funding, seek designation as Strategic Project, bid in supported innovation
procurement or in public procurement that sets PQC requirements, take part in a regulatory
sandbox or the business platform, or receive a targeted information request. Documentation
for investment support (EUR 0.05 million), time that firms choose to spend in the new
26
structures without a legal requirement. Voluntary participation costs, public-administration
resources, programme expenditure and transfers are outside the administrative-burden
component of the One-In, One-Out calculation. The initiative does not remove existing
obligations that qualify as administrative offsets and does not impose administrative burdens
on citizens.
The one-off column annualises the one-off burden over 2028-2037 (EUR 0.30 million
nominal). The recurrent column gives the average nominal annual burden in the years in
which it arises, 2029-2037 (between EUR 0.56 million and EUR 0.72 million a year). On a
discounted basis, the business administrative burden is EUR 5.46 million NPV over 2028-
2037, equivalent to EUR 0.621 million a year. No administrative burdens are imposed on
citizens and no qualifying administrative offsets or business adjustment costs are identified
under PO2.
14. RELEVANT SUSTAINABLE DEVELOPMENT GOALS
The preferred option is expected to contribute principally to Sustainable Development
Goals 4, 8 and 9.
IV. Overview of relevant Sustainable Development Goals – Preferred Option(s)
Relevant SDG Relevant SDG Relevant SDG
SDG 4 – Quality education Positive contribution through quantum skills, training,
mobility and user-capability measures.
Effects depend on
participation, programme
resources and the capacity to
address identified skills gaps.
SDG 8 – Decent work and
economic growth
Positive contribution through support for firm growth,
investment, industrial deployment and specialised
employment.
No aggregate employment
effect is quantified ex ante
because impacts depend on
technological and market
development.
SDG 9 – Industry, innovation and
infrastructure
Strong positive contribution through improved research-
to-deployment pathways, shared infrastructure,
industrialisation support and innovation uptake.
Table 3.5. Overview of relevant sustainable development goals (preferred option)
15. IMPACTS ON FUNDAMENTAL RIGHTS
Measure Right or interest affected Required safeguards
Information requests and
reporting
Data protection, trade secrets and
freedom to conduct a business
Defined purpose and population, necessity,
minimisation, confidentiality, once-only reuse
and review rights
Project designation, access and
support
Equal treatment, property interests and
freedom to conduct a business
Transparent criteria, reasoned decisions, right to
be heard, review and withdrawal procedures
Procurement and eligibility
conditions
Equal treatment, market access and
business freedom
Prior market analysis, proportionality,
availability tests and transparent exceptions
Standards and assurance Technological neutrality and
compliance costs
Maturity triggers, phased application, defined
scope and periodic review
Security-sensitive
participation conditions
Academic freedom, openness of
research and international cooperation
Risk-based assessment and distinction between
open research and sensitive deployment
Table 3.6. Fundamental-rights and procedural safeguards
27
ANNEX 4: ANALYTICAL METHODS
16. PART A - ANALYTICAL FRAMEWORK
16.0. PURPOSE AND SCOPE
This annex explains the analytical methods used to assess the impacts of the retained policy
options for the EU Quantum Act.
It describes:
• the analytical framework and evidence base;
• the treatment of the dynamic baseline;
• the construction of the policy options;
• the methodology used to assess costs and benefits;
• the Standard Cost Model;
• the aggregation of measure-level impacts into option-level results;
• the treatment of programme expenditure;
• the approach to uncertainty and sensitivity; and
• the development, governance, validation and quality-assurance arrangements of the
analytical work
Detailed option- and measure-level impacts are provided in Annex 8. Parts B and C of this
annex present the detailed cost model, assumptions and sensitivity analysis.
The analysis follows the European Commission’s Better Regulation methodology, including
the typology of costs and benefits, the Standard Cost Model, discounting and sensitivity
analysis. It combines quantitative analysis where a sufficiently robust causal mechanism and
data source are available with structured qualitative assessment where monetisation would
be speculative or misleading.
The quantitative estimates are central values; Parts B and C set out their low and high values
and the sensitivity and probabilistic analysis.
16.1. DEVELOPMENT, GOVERNANCE, VALIDATION AND TRANSPARENCY OF THE
ANALYTICAL WORK
The analytical work supporting the Impact Assessment was developed through a
combination of external analytical support and Commission-services analysis. The external
support study undertaken by PPMI/d-fine was designed to provide a comprehensive
evidence base for the assessment of a potential European Quantum Act. Its methodological
framework combined quantitative evidence, including statistics, indicators, funding and
market data, with qualitative evidence, including stakeholder interviews and surveys. The
methodology supported the problem analysis, assessment of impacts and cost-benefit
analysis of the policy measures and policy options.
The scope and methodological approach of the external study were developed iteratively
with the Commission. The Contractor provided evidence, analytical input, feedback and
suggestions as the Impact Assessment evolved, while responsibility for the Impact
Assessment, the Policy Option design and the analytical and policy conclusions remained
with the Commission. The scope and approach were discussed and refined through meetings
and written exchanges with the Commission, including the methodological agreements and
successive updates documented in the study.
Validation and quality assurance relied principally on triangulation across different types
and sources of evidence. Quantitative data, including statistical indicators and financing
data, were assessed alongside qualitative evidence from interviews, surveys and other
stakeholder inputs. This approach was used to test the consistency of findings across
28
evidence sources and to identify areas of uncertainty or divergence. The Commission further
assessed the evidence against Union and national programme data, Commission-services
analysis and published institutional and academic sources. Assumptions that could not be
supported by sufficiently robust point estimates are treated through low, central and high
values, sensitivity analysis or explicitly identified qualitative or scenario-based assessment.
Where possible, evidence was disaggregated by Member State or non-EU country and by
quantum-technology pillar. The Impact Assessment presents aggregate findings and
methodological assumptions, while commercially confidential or security-sensitive
underlying evidence is handled separately as described in Annex 1.
16.2. ANALYTICAL FRAMEWORK
The assessment follows the intervention logic established in the Main Report:
problem drivers → problems → specific objectives → policy measures →
policy options → outputs → results → impacts
Each Policy Measure family is linked to one or more problem drivers and specific objectives.
Its incremental costs and expected effects are assessed relative to the dynamic baseline
through an explicit causal mechanism. Policy measures are then packaged into three
mutually exclusive policy options representing increasing intervention intensity.
Step Principal analytical question Main output
1. Problem
evidence
What is the nature and scale of the
problem, and how strong is the
evidence?
Baseline indicators, stakeholder evidence
and explicit data limitations.
2. Intervention
logic
Which drivers can Union action
influence?
Section 2.2 in the Impact Assessment
Main Report
3. Measure
assessment
What activities, actors, costs and
outcomes would each PM variant
generate?
PM definitions and variants (Table 4.5
and Table 4.6), measure-level impact
assessment (Table 8.4), and monitoring
indicators (Table 10.4).
4. Option
construction
How do PO1, PO2 and PO3 differ in
legal force, coverage and
implementation intensity?
PM1–PM16 Policy Measure variant matrix
(Table 4.6)
5. Impact
assessment
What economic, social, environmental,
fundamental-rights, governance and
implementation impacts are expected?
Monetised results, physical or financial
scenarios and qualitative assessment.
6. Option
comparison
Which option performs best on
effectiveness, efficiency, coherence,
proportionality and feasibility?
Structured comparison and transparent
MCDA support.
7. Uncertainty
testing
Do the conclusions change under
plausible alternative assumptions?
Deterministic ranges, infrastructure
scenarios, switching values and weight
sensitivity.
Table 4.1. Analytical steps
16.3. EVIDENCE BASE
The analytical evidence consists principally of:
• the stakeholder consultation described in Annex 2;
• the external PPMI/d-fine support study;
• Union and national programme and administrative data;
• mappings of quantum firms, investments, infrastructures, procurement schemes,
standardisation activities, skills and critical components;
• the Quantum Europe Strategy and the Strategic Research and Industry Agenda 2030;
• JRC, EIB, EPO/OECD and other institutional analyses;
• academic evidence on innovation procurement and financing; and
29
• comparable Union impact assessments and instruments, including the Chips Act,
Critical Raw Materials Act and cybersecurity legislation.
Evidence was triangulated across sources where possible. Company, investment,
infrastructure and procurement mappings are not exhaustive. Supplier and dependency
information is particularly affected by commercial confidentiality and incomplete visibility
beyond firms’ direct suppliers.
The public analysis therefore presents aggregate results. Detailed commercially confidential
or security-sensitive material is placed in the Restricted Evidence Pack.
16.4. ANALYTICAL PERIMETER AND CONVENTIONS
Element Treatment in the model
Assessment period 2028–2037
Price base Real 2024 prices
Discount rate 3% per year
Discounting convention Present value in 2028:
= ∑
(1+0.03)(−2028) 2037 =2028
Policy baseline Dynamic baseline including existing Union and Member State
programmes, infrastructures and already planned measures.
Existing laboratories and
facilities
Construction costs and ordinary operating expenditure remain in the
baseline.
Existing Chips Act or other
competence/acceleration
centres
Existing capacity remains in the baseline; only incremental quantum-
related adaptation is counted.
One-off costs Assigned to the expected year in which the obligation or activity begins.
Recurrent costs Applied annually from the relevant starting year until 2037.
Labour resources Person-days multiplied by the relevant fully loaded labour-cost rate.
FTE conversion 225 person-days per FTE.
Administrative burdens Information obligations only, in accordance with the Standard Cost
Model.
Adjustment costs Substantive costs of changing procedures, systems or behaviour, shown
separately from information obligations.
Transfers Grants, vouchers, procurement expenditure and financial commitments
are not treated automatically as societal costs.
User fees Budgetary transfers; they do not affect societal net present value.
Residual value Included only for eligible durable incremental assets; zero in the central
case.
Monetised benefits Demonstrable time and resource savings only.
Strategic benefits Assessed qualitatively or through explicitly labelled scenarios.
Main societal-cost perimeter Core policy machinery plus marginal hub-service and centre-adaptation
resources.
PO2 programme-resource
envelope
Single bottom-up envelope reported separately in Annex 4; excluded
from the Standard Cost Model, option totals and societal-cost calculation.
Table 4.2. Analytical conventions used in the model
The model distinguishes three analytical views:
1. Core policy machinery: administrative, adjustment, coordination, monitoring,
assessment and other real resources required to operate the measures.
2. Incremental implementation resources: marginal public-facing services provided
through existing hubs and adaptation of existing or suitable Centres.
3. Total societal cost: core policy machinery plus incremental implementation
resources.
30
Public-budget expenditure and financing or investment volumes are reported separately.
This prevents transfers, financing targets and real-resource costs from being added together.
16.5. DYNAMIC BASELINE AND ATTRIBUTION
All impacts are assessed relative to the dynamic baseline described in Section 5.1 of the
Main Report. The baseline includes the expected implementation of the Quantum Europe
Strategy; the expanded EuroHPC JU mandate; quantum-chip design, pilot-line and
validation activities under the Chips JU; Horizon Europe and the Digital Europe
Programme; EuroQCI and related connectivity activities; existing EIC, InvestEU and EIB
Group instruments; Member State strategies, programmes and infrastructures; European and
international standardisation; the coordinated PQC roadmap; and the existing cybersecurity,
foreign-investment-screening, export-control and critical-raw-material frameworks.
Costs and benefits already expected under those instruments are not attributed to the
Quantum Act. Only the incremental effects of PO1, PO2 and PO3 are counted. Where an
option uses an existing programme, institution, facility or administrative system, the model
counts only the additional activity attributable to the Quantum Act, not the historical
construction cost or ordinary operation of the underlying programme or institution.
The central infrastructure case assumes reuse of existing laboratories and adaptation of
existing or suitable competence and acceleration centres. It includes only marginal public-
facing services and quantum-related adaptation. A separate full-build scenario is retained as
a stress test and does not represent the central policy design.
The substantive costs of the transition to post-quantum cryptography are included in the
baseline because the coordinated roadmap and relevant cybersecurity and sectoral
frameworks already establish the policy direction. If implementation of the baseline PQC
roadmap materially lags behind the central assumption, incremental costs attributable to the
Act could be higher. This is considered through baseline sensitivity analysis. PO1 adds no
PQC-specific measure or incremental PQC cost beyond the dynamic baseline. Under PO2,
PM13 is credited only with the incremental costs of a biennial EU preparedness assessment
based on information from Member States and Union entities (the first by the end of 2028),
coordinated PQC exercises, PQC requirements in public procurement and structured
cooperation between the Quantum Strategy Board and the NIS Cooperation Group,
including regular exchange, coordination and monitoring of implementation of the existing
PQC roadmap. Under PO3, implementation of the existing PQC roadmap becomes binding
through time-bound migration requirements. No separate substantive PQC migration,
testing or certification costs are attributed to PO3, as these implementation costs are already
part of the dynamic baseline. Technical migration costs already attributable to the baseline
are not counted again.
Sensitivity analysis tests a stronger baseline, lower and higher participation and cost
assumptions, and alternative infrastructure-resource cases. The purpose is to identify
whether the relative option ranking depends on optimistic assumptions about the
additionality of the Act.
16.6. ANALYTICAL BOUNDARY AND TREATMENT OF THE BASELINE
The calculations are incremental to the dynamic baseline described in the main report.
Existing Union and Member State programmes, existing laboratories, existing testing
capacity and the ordinary operation of existing facilities are included in PO0. Their historical
construction expenditure and ordinary operating expenditure are not attributed to the
Quantum Act.
The central case assumes that the Act coordinates and improves access to existing Member
State laboratories and adapts existing Chips Act or comparable centres for quantum-related
services. It counts only the resources that would be additional to the baseline, including:
31
• marginal resources for public-facing hub coordination and user services;
• one-off or targeted adaptation of existing centres;
• specialist technical support attributable to the additional quantum functions;
• operation of the governance, monitoring and delivery framework;
• information obligations and adjustment costs created by the option; and
• other incremental administrative and implementation resources.
The central case does not attribute to the Act:
• the original construction cost of existing facilities;
• ordinary laboratory or centre operating expenditure that would occur without the
Act;
• the full value of grants, financial instruments, procurement or investment envelopes
as societal costs;
• financing volumes as economic benefits;
• user-fee receipts as societal benefits; or
• an assumed monetary value for services provided by hubs or centres where there is
insufficient evidence to establish additionality, utilisation and willingness to pay.
A separate full-build scenario is retained only as a stress test. It illustrates the consequences
of attributing new-build and broader infrastructure costs to the options but does not represent
the central policy design.
View Content Treatment in the Impact Assessment
View 1 - Core
policy
machinery
Administrative, adjustment, coordination,
monitoring, implementation and other real-
resource costs generated by the policy
measures
Included in the central societal cost
View 2a - Gross
incremental
implementation
resources
Marginal hub services and quantum
adaptation of existing centres before any
residual-value adjustment
Included where additional to PO0
View 2b -
Residual-value
credit
Remaining value of eligible durable
incremental assets at the end of the
assessment period
Included only where an eligible durable
asset is evidenced
View 2 - Net
incremental
implementation
resources
Gross incremental resources less any
eligible residual value
Included in the central societal cost
View 3 - Total
societal cost
View 1 plus View 2 Headline cost perimeter
Public-budget
impact
EU and Member State expenditure,
including transfers and financial
commitments where applicable
Reported separately from societal cost
Financing-
volume view
Mobilised finance, investment pipeline or
demand volumes
Indicator only; not added to welfare
benefits
Full-build stress
case
Counterfactual construction and broader
facility-operation scenario
Sensitivity test only
PO2
programme-
resource
memorandum
EUR 5.19–6.12 billion indicative Union
contribution, corresponding to EUR 12.90–
18.08 billion total direct programme
resources, with action-specific Member
State and industry participation
Reported separately in part D of this
Annex; excluded from societal-cost,
administrative-burden, OIOO and
financing-volume calculations. Broader
sector financing needs are reported
independently.
Table 4.3. Cost and resource views used in the workbook
This separation prevents transfers, investment volumes and real economic-resource costs
from being combined in a single total.
32
16.7. POLICY OPTIONS
The options are alternative appraisal packages constructed along an increasing-intensity
ladder. PO2 proposes measures that retain the useful enabling aspects of PO1 while adding
targeted legislative and delivery mechanisms. PO3 proposes higher-intensity variants where
possible and retains the PO2 architecture where the assessment showed that a higher-
intensity implementation would not be feasible. The options remain mutually exclusive for
appraisal.
Scenario /
policy option
Intervention logic Main content
PO1 –
Voluntary
horizontal
framework
Non-legislative,
ecosystem-wide and
market-enabling
approach based on
voluntary
participation.
Voluntary Commission-Member State coordination and
structured stakeholder input; non-binding alignment of priorities,
scientific cooperation and challenge mapping; voluntary
cooperation among facilities, competence centres, investors,
buyers and users; and support for skills, standards, supply-chain
mapping and international cooperation. It would create no new
legal obligations, formal designations, reserved finance or
mandatory reporting. Participation by Member States and
ecosystem actors would remain voluntary.
PO2 –
Enabling
Quantum
Framework
Act
Targeted legislative
framework
establishing
structured EU–
Member State
governance and
delivery
arrangements, while
relying mainly on
existing
implementing bodies.
A Regulation would establish common planning and review,
governance bodies and a platform gathering structured
stakeholder input; formal cooperation between research
institutions, quantum facilities and infrastructure to improve
access and accelerate technological and industrial development;
structured investment and first-buyer support; skills,
standardisation and benchmarking coordination; risk-based
dependency monitoring; quantum-safe preparedness through a
biennial EU preparedness assessment, coordinated exercises and
PQC requirements in public procurement, with structured
cooperation between the Quantum Strategy Board and the NIS
Cooperation Group on implementation and monitoring of the
existing PQC roadmap; and coordinated international
cooperation. Obligations would fall mainly on the Commission,
Member States and designated or Union-supported actors, while
participation by other firms and users would generally remain
voluntary. The option would not create a new Union agency or
an automatic entitlement to funding.
PO3 – High-
intensity
targeted
framework
PO2 architecture
combined with
stronger, binding
variants in a limited
number of areas
where greater
implementation
certainty is being
tested.
PO3 would retain the full architecture of PO2 and add stronger
variants only for PM7, PM10, PM11 and PM13: strategic
procurement conditions in predefined categories; dedicated or
ring-fenced risk-bearing finance capacity; wider mandatory
dependency information and mitigation; and binding
implementation of the PQC roadmap. All other measures operate
as under PO2.
Table 4.4. Policy Option architecture
PO1 contains 15 costed PM families, including the voluntary PM3a challenge-mapping
variant; for PM13 it adds no measure beyond the dynamic baseline. PO2 and PO3 also
contain all 16. PO3 differs from PO2 only for PM7, PM10, PM11, PM13. Where PO2 and
PO3 use the same PM variant, differences in implementation conditions are tested through
sensitivity analysis rather than by assuming a different central physical-infrastructure
system.
16.8. SELECTION OF POLICY MEASURES
The following table defines the common function of each policy measure. It identifies the
baseline gap that justified its inclusion, its principal operating mechanism, the actors
33
concerned and the main delivery safeguards. The measure names describe policy functions
and do not necessarily imply the creation of separate legal entities or funding instruments.
Measure Baseline gap and reason for
selection
Operational content and
causal mechanism
Principal addressees,
delivery and safeguards
PM1 – Common
programming
framework
Union and national
programmes operate through
separate priorities and
planning cycles.
Establishes common priorities,
an EU programme chapter and
structured national quantum
chapters, supported by
portfolio and gap analysis.
Commission, Member States
and implementing bodies.
Funding decisions remain
with competent programmes
and authorities.
PM2 – Quantum Science
and Technology (S&T)
Excellence Network
European scientific
capabilities are strong but
dispersed across institutions,
programmes and Member
States.
Connects leading and
emerging capabilities around
shared scientific priorities,
mobility and access to
enabling infrastructures.
Universities, research
organisations and RTOs.
Distributed structure, open
participation and excellence-
based selection.
PM3 – Quantum Grand
Challenges
Existing calls do not always
concentrate sufficient critical
mass on shared scientific and
engineering bottlenecks.
Uses mission-oriented
competitions, milestones and
stage gates to concentrate
resources and redirect or
terminate underperforming
activities.
Research organisations,
firms and specialised
facilities. Open competition,
technology neutrality and
independent review.
PM4 – Technology and
Innovation Hubs
Firms face fragmented access
to engineering, prototyping,
integration, testing, validation
and qualification capabilities.
Designates specialised
capabilities and creates
transparent cross-border
access, accelerating
progression from laboratory
results to deployable
technologies.
Start-ups, SMEs, RTOs and
facility operators. Existing
capacity first; additional
capacity only after
demonstrated gap and
demand assessment.
PM5 –Strategic
Quantum
Infrastructures and
Strategic Quantum
Projects
Cross-border projects must
navigate research,
infrastructure, finance and
procurement instruments
separately.
Provides transparent
designation and coordinated
sequencing of relevant support
pathways.
Project promoters, Member
States, programmes,
facilities and financial
institutions. No automatic
funding, State-aid approval,
procurement preference or
regulatory exemption.
PM6 – Competence and
Acceleration Centres
Potential users and SMEs
lack accessible first-level
support for identifying use
cases and navigating
expertise, finance and
infrastructure.
Creates a distributed first-level
orientation and referral
network connected to Hubs,
skills, suppliers, finance and
procurement.
SMEs, public authorities and
other users. Suitable existing
national and regional
structures should be reused;
Centres do not duplicate Hub
engineering functions.
PM7 – Innovation
procurement
Public demand is fragmented
and successful pilots do not
systematically progress to
reference deployment or
repeat purchasing.
Supports buyer groups,
PCP/PPI, functional
specifications and reference
deployments, creating early
revenues and operational
evidence.
Contracting authorities,
public users and suppliers.
Award decisions remain with
contracting authorities;
conditions require market
analysis and proportionality.
PM8 – Standards,
benchmarking and
assurance
Incomplete terminology,
benchmarks, test methods and
interoperability references
increase due-diligence and
deployment costs.
Coordinates measurement
methods, benchmarks,
interoperability profiles,
testing references and
maturity-based assurance
pathways.
Suppliers, users, metrology
bodies and standardisation
organisations. Formal
standards remain with
recognised bodies; PO3 uses
the same PM8 variant as
PO2.
PM9 – Skills and
mobility
Industrial engineering,
software, technical,
procurement and user-side
skills are insufficiently
connected to deployment
needs.
Links skills intelligence,
training, mobility and user-
capability actions to
infrastructures, projects and
procurement.
Member States, education
providers, firms, facilities
and users. National
education competence is
preserved;.
34
PM10 – Quantum
Investment Service Desk
Firms face discontinuity
between grants, early equity
and later-stage industrial
finance.
Creates an investment pipeline
and thematic window or
mandate linking firms and
projects to appropriate Union,
national and private financing.
Firms, Strategic Projects,
financial institutions and
private investors.
Independent due diligence,
additionality and risk-
sharing remain applicable.
PM11 – Strategic
intelligence and
dependency monitoring
No actor has a sufficiently
complete Union-level view of
critical components,
suppliers, substitutability and
disruption risks.
Establishes a dashboard, risk-
based dependency mapping,
early warning and links to
diversification and mitigation.
Commission, Member
States, supported actors and
defined critical value-chain
actors. Necessary and
proportionate requests,
confidentiality, data
minimisation and once-only
reuse.
PM12 – Quantum
Business Platform
Commercial, investment and
partnership information is
fragmented across countries
and technology domains.
Provides voluntary
matchmaking among
suppliers, users, investors and
facilities and improves market
visibility.
Firms, users, investors and
facilities. Participation
remains voluntary and
commercial information is
separated from regulatory
reporting.
PM13 – Quantum-safe
preparedness
Implementation readiness
under the existing PQC
roadmap varies across
Member States and critical
sectors.
PO1 adds no measure beyond
the baseline. PO2 provides for
a biennial EU preparedness
assessment based on
information from Member
States and Union entities,
coordinated exercises and PQC
requirements in public
procurement, and establishes
structured cooperation
between the Quantum Strategy
Board and the NIS
Cooperation Group for regular
exchange, coordination and
monitoring of implementation
of the existing PQC roadmap;
PO3 additionally tests binding
roadmap implementation for
defined critical actors.
Commission, Member
States, ENISA, cybersecurity
authorities and defined
critical operators. No parallel
cybersecurity authority,
certification body or
incident-reporting regime.
PM14 – Strategic
international
cooperation
Union and Member State
cooperation with third
countries is not always
coordinated around common
priorities, reciprocity and
resilience.
Establishes criteria-based
coordination for research,
standards, skills, market access
and trusted supply
partnerships.
Commission, Member States
and international partners.
Applicable programme,
trade, security and
international-law safeguards
remain fully applicable.
PM15 – Quantum
Strategy Board
PD1: no durable process
jointly reviewing Union and
national priorities, gaps and
implementation.
Establishes a regular
Commission–Member State
strategic review cycle,
improving visibility,
sequencing and coordination.
Commission and Member
States. Strategic role only; no
transfer of national budgets
or programme-management
powers.
PM16 – European
Quantum Alliance
Stakeholder input from
industry, research, users,
investors and standards
communities remains
fragmented.
Provides a structured interface
through which ecosystem
evidence and implementation
feedback inform strategic
review.
Industry, start-ups, RTOs,
researchers, users and
investors. No funding,
certification or enforcement
powers.
Table 4.5. Reasoning behind the selection of policy measures
35
16.9. POLICY MEASURES VARIANTS PER POLICY OPTION
Below we describe in more detail the different implementations proposed for each Policy
Measure (PM), depending on the Policy Option (PO) implemented.
Policy measure PO1 – Voluntary framework PO2 – Enabling Quantum
Framework
PO3 – High-intensity
targeted framework
INTERVENTION AREA 1: Sustaining and further developing Europe’s quantum R&I excellence
PM1: Common
programming
framework
PM1a: Provides a voluntary exchange
of information on EU and Member
States programmes, and voluntary
alignment on common priorities,
reinforcing coordination as compared
to the dynamic baseline.
PM1b. Provides a common EU–
Member State framework for
developing a shared quantum
strategy and linking Union and
national programmes through a
common programming
framework around agreed
priorities, while funding and
work-programme decisions
remain with the competent
bodies
PM1b. same as PO2.
PM2: Quantum
Science and
Technology
Excellence
Network
PM2a: Strengthening links across the
Quantum Flagship community and
European Research Area Networks
via a voluntary quantum-focused
network of Coordination and Support
Actions.
PM2b: Statutory establishment
of a distributed cooperation
network between leading and
emerging laboratories,
universities, RTOs and
infrastructures; creates sustained
European scientific and
technological critical mass
without establishing a central
institution. It would foster long-
term scientific cooperation and
enhance R&I capacity
PM2b. same as PO2.
PM3: Quantum
Grand Challenges
PM3a: Voluntary mapping and
alignment on challenges, identified
through screening of calls from the
EuroHPC JU, EIC
Pathfinder/Accelerator Challenges,
and other relevant EU, national and
regional programmes; no process to
redirect or stop unsuccessful
pathways.
PM3b: Competitively selected,
mission-oriented R&I actions
bringing together research
organisations, firms’ industry,
start-ups, scale-ups and
specialised facilities around
ambitious objectives and
milestones. They would
concentrate resources on
selected scientific and
technological bottlenecks and
unsuccessful pathways would be
redirected or stopped thanks to
independent review points.
PM3b. same as PO2.
INTERVENTION AREA 2: Accelerating Europe’s quantum industrialisation, deployment and demand
36
PM4: Technology
and Innovation
Hubs
PM4a.Voluntary creation of
Specialised Hubs. They would be
centred on start-ups and SMEs,
bringing together the expertise,
services and infrastructure needed for
accelerating the technological
developments of SMEs, while also
providing infrastructure facilities for
industrial engineering, prototyping,
system integration, testing, validation
and qualification of quantum systems
and processes.
PM4b. Creation of a limited
number of Specialised Hubs as
described in PM4a. Existing
facilities would be used first.
Upgrades or new capacity would
be supported only where EU-
level mapping shows
unaddressed important gaps or
additional demand for a facility
or service.
PM4b. same as PO2.
PM5.1 :
Strategic
Quantum
Infrastructures
PM5.1a. Supporting, on a voluntary
basis, the further development of
existing or new large-scale strategic
European Pilot infrastructures to
demonstrate and validate quantum
technologies at European scale before
wider deployment. Examples include
the European Quantum
Communication Infrastructure
(EuroQCI) for quantum secure
communications, quantum-enhanced
medical imaging, a full-scale
European quantum computer, the
quantum Internet or quantum sensing
and gravimetry.
PM5.1b. As under PO1, but
within a statutory Union
framework enabling the
continued implementation of
existing infrastructures and the
selection and development of
new pilot quantum
infrastructures on Union on the
basis of EU added value, cross-
border relevance, technological
maturity and deployment needs.
Funding, procurement and
access arrangements would
remain under the relevant
programmes and competent
bodies.
PM5.1b. same as PO2.
PM5.2:
Strategic
Quantum Projects
PM5.2a Voluntary identification and
coordination of major industrial
projects of European relevance, such
as quantum foundries, or other
strategic industrial capabilities.
PM5.2b The Commission would
designate Strategic Quantum
Projects through an open process
based on predefined criteria,
including Union added value,
cross-border relevance, strategic
importance and implementation
maturity, with input from the
Quantum Strategy Board (see
PM15). Designation would not
automatically confer funding or
State aid approval.
PM5.2b - same as PO2.
PM6: Competence
and Acceleration
Centres
PM6a. Voluntary distributed first-
contact points helping start-ups,
SMEs, public authorities and other
users identify relevant use cases, and
obtain initial technical and business
support and referral to Hubs,
infrastructures, finance, skills,
suppliers and procurement
opportunities. They would reduce
navigation and adoption barriers
without duplicating the specialised
engineering role of the Hubs (PM4).
PM6b. The centres, as described
in PM6a, would be formally
created. Each Member State
would establish at least one
Quantum Competence and
Acceleration Centre,
individually or jointly with other
Member States or partner states.
PM6b. same as PO2.
37
PM7: Innovation
procurement
PM7a. Voluntary buyer groups,
market consultations, supplier–user
matchmaking, model procurement
documents and technical guidance.
PM7b. Coordinated pre-
commercial procurement, public
procurement of innovative
solutions and reference
deployments based on common
use cases and functional
specifications. The measure
would strengthen buyer capacity
and support progression from
experimentation to operational
deployment and repeat demand.
Procurement decisions would
remain with the competent
contracting authorities.
PM7c. PO2 measures
combined with common
eligibility or sourcing
conditions in predefined
strategic procurement
categories, only where
objectively justified by
security of supply or
resilience and subject to
market-availability tests,
proportionate exceptions
and applicable Union and
international law.
PM8: Standards,
benchmarking and
assurance
PM8a. Support for pre-
standardisation, measurement,
benchmarking and voluntary technical
cooperation.
PM8b. Support common
terminology, measurement
methods, performance
benchmarks, interoperability
profiles and testing procedures in
a structured common pathway.
Where technologies and
assessment methods are
sufficiently mature, voluntary
third-party testing or labelling
may be used to verify specified
performance, interoperability or
security claims. Formal
standards would remain within
the recognised standardisation
system.
PM8b. Same as PO2.
PM9: Skills and
mobility
PM9a. Voluntary mapping and
exchange on skills needs, training
offers, mobility and user-support
services.
PM9b. Coordinated skills
intelligence, training, mobility
and reskilling linked to the
common programming
framework, infrastructures,
Hubs, Grand Challenges,
Strategic Projects and user
capabilities. The measure would
focus on demonstrated shortages
in engineering, software,
systems integration, technical
operations and user- and buyer-
side expertise, while respecting
Member State responsibility for
education policy.
PM9b. same as PO2.
INTERVENTION AREA 3: Improving Europe’s quantum resilience, monitoring and governance mechanisms
PM10: Quantum
Investment
Service Desk
PM10a. Voluntary investor–company
matchmaking, investment-readiness
guidance and referrals to existing
Union, national and private financing
instruments.
PM10b. A Commission-
coordinated Quantum
Investment Service Desk
providing investment-readiness
advice and facilitating referrals
to existing Union, national and
private financing opportunities.
It may facilitate coordination
among financing actors, while
individual financing decisions
remain with the competent
institutions.
PM10c. Retains PM10b
and adds dedicated
quantum investment
mandate or capacity
within existing or future
financial instruments,
providing greater risk-
bearing and rapid-
response support for
scale-up and strategic
capabilities.
38
PM11: Strategic
intelligence and
dependency
monitoring
PM11a. Voluntary dashboard based
on public and voluntarily supplied
information.
PM11b. Commission-led, risk-
based mapping and early
warning covering defined
critical components, suppliers,
concentration, substitutability
and disruption risks. Existing
information would be used first;
supported facilities, designated
Strategic Projects and actors in
clearly defined critical
categories could be required to
contribute proportionate
information where necessary.
PM11c. PM11b mapping
combined with targeted
mandatory information
requests for designated
projects, infrastructure
operators and actors in
predefined critical value-
chain categories.
Identified risks would be
referred to existing
finance, procurement,
supplier-qualification,
diversification and
economic-security
instruments.
PM12: Quantum
Business Platform
PM12a. Voluntary creation and
participation in a light-touch platform
providing company visibility,
matchmaking and information on
capabilities and needs.
PM12b. Voluntary participation
in a formally supported platform
bringing together quantum firms,
users, investors, facilities and
public buyers. The platform
provides regular matchmaking,
market intelligence and visibility
of capabilities, needs and
partnership opportunities.
Commercial information
submitted to the platform would
remain separate from regulatory
reporting and funding eligibility.
PM12b. same as PO2.
PM13: Quantum-
safe preparedness
PM13a. No additional measure
beyond the dynamic baseline.
PM13b. Structured cooperation
on PQC between the Quantum
Strategy Board, the NIS
Cooperation Group and other
relevant existing cybersecurity
structures, providing for regular
exchange, coordination and
monitoring of implementation
of the existing PQC roadmap; a
biennial EU PQC preparedness
assessment, the first by the end
of 2028, based on information
from Member States and Union
entities; coordinated PQC
exercises; and PQC
requirements in public
procurement.
PM13c. Make binding
the implementation of the
existing PQC roadmap
through time-bound
migration requirements.
PM14: Strategic
international
cooperation
PM14a. Existing partnerships and
dialogues would continue, supported
by voluntary coordination and
information exchange.
PM14b. COM, advised by the
Quantum Strategy Board (see
PM15), would coordinate
trusted and reciprocal
cooperation with third countries
covering research, standards,
skills, reciprocal infrastructure
and market access, use cases
and supply diversification. It
would coordinate EU and
Member State approaches, help
build critical mass and resilient
supply relationships while
distinguishing open research
from sensitive deployment and
protecting Union interests.
PM14b. same as PO2.
39
PM15: Quantum
Strategy Board
PM15a: Advisory group bringing
together the Commission, Member
States and relevant national
implementing bodies. It will
strengthen the informal EU-MS
coordination of the dynamic baseline,
while exchange of information and
alignment would remain purely
voluntary.
PM15b: High-level
Commission–Member State
body for developing a shared
strategy, agreeing common
priorities, reviewing
implementation and identifying
investment, infrastructure and
capability gaps and potential
synergies. It is needed because
no existing body reviews the
combined Union and national
quantum portfolio.
PM15b. same as PO2.
PM16: European
Quantum Alliance
PM16a: Voluntary structured
stakeholder platform bringing
together industry, start-ups, research
organisations, RTOs, users, investors
and standards communities. It would
provide evidence and implementation
feedback, enabling structured
stakeholder input as compared to the
informal research and industry
networks of the dynamic baseline.
PM16b same as PM16a, with
the Alliance being formally
established and linked to the
Quantum Strategy Board for the
functions detailed in PM16a.
PM16b. same as PO2
Table 4.6. Policy Measures per Policy Option
Together, the measures address the full intervention chain from strategic prioritisation and
scientific excellence to industrialisation, finance, deployment, trusted uptake and resilience.
Several measures respond to more than one driver because the identified market,
coordination and information failures are mutually reinforcing.
40
17. PART B - COST MODEL
17.0. COST TYPOLOGY
Costs are classified in accordance with the Better Regulation Toolbox.
Cost category Examples in the Quantum Act
One-off administrative
costs
Initial templates, national chapters, dashboard design, designation procedures
and establishment of structured PQC coordination arrangements between the
Quantum Strategy Board and the NIS Cooperation Group.
Recurrent
administrative costs
Board participation, periodic updates, monitoring, reporting, targeted
information responses and information validation, national information for the
PQC preparedness assessment, evidence of compliance with PQC requirements
in public procurement and its verification, and the information that firms
provide to take part in regulatory sandboxes, the business platform or
investment support (applications for investment support are not offset under
One-In, One-Out)
One-off adjustment
costs
Adapting facility procedures, data systems or internal processes
Recurrent adjustment
costs
Access management, assurance activities, updating migration plans and
maintaining cryptographic-asset inventories (PM13c, PO3 only).
Enforcement and
implementation costs
Review of obligations, Strategic Project monitoring, follow-up to information
requests and Member State participation in coordinated PQC exercises;
implementation of the act by the Commission (administration, platform build
and operation), implementing bodies, Commission-financed experts and Hub
and Centre operators; effort of Member State authorities in measures that the
act enables but does not require (joint innovation procurement, PQC
cooperation)
Participation without a
legal requirement (not a
compliance cost)
Time that firms choose to spend in the new structures without any legal
requirement (Alliance input, standards and benchmarking work, platform input
and matchmaking, PQC expert time). Counted in the total societal cost; not a
compliance cost under Tool #56 and outside One-In, One-Out.
Substantive
programme
expenditure
Grants, procurement, infrastructure support and financial allocations; treated
separately from administrative costs
Regulatory fees or
charges
None assumed unless expressly introduced in the final legal design
Table 4.7. Cost categories
Costs are allocated to:
• Commission and Union services;
• Member State authorities;
• implementing bodies, Joint Undertakings and agencies;
• businesses and infrastructure operators; and
• other affected actors where relevant.
Information that firms provide as a condition of Union funding, Strategic Project
designation, supported procurement or PQC requirements in public procurement, in reply to
a targeted request, or to take part in a regulatory sandbox, the business platform or
investment support is costed as an administrative cost. Documentation for investment
support (PM10) is an application for financial support and is therefore not offset under One-
In, One-Out (Tool #58, Box 4). The effort of Member State authorities in measures that the
act enables but does not require (joint innovation procurement, PQC cooperation) is an
implementation cost, which Tool #56 counts as an enforcement cost. Time that firms choose
41
to spend in the new structures without any legal requirement is not a compliance cost; it is
included in the total societal cost and shown separately (Table 4.21).
17.1. CALCULATION METHODOLOGY
Each individual model item identifies:
• the responsible or affected actor;
• the cost or benefit category;
• whether the item is one-off or recurrent;
• the starting year and duration;
• the affected population;
• the frequency of the activity;
• the time requirement;
• the applicable labour-cost rate;
• any non-labour unit cost;
• the relevant Policy Measure variant;
• the low, central and high assumptions; and
• the source and evidential strength of the assumption.
Component Calculation approach
One-off labour cost Number of affected actors × person-days per actor × labour-cost rate
Recurrent labour cost Number of affected actors × frequency per year × person-days per event ×
labour-cost rate
Non-labour resource
cost
Number of actors or activities × applicable unit cost
Administrative burden
on businesses
Business population × frequency × time per information obligation × labour-
cost rate, plus necessary external costs
Commission resources Commission person-days divided by 225 to obtain FTE, plus relevant non-staff
resources
Member State
resources
Aggregate person-days across Member States divided by 225; per-Member-
State figures divide the aggregate by 27
Hub-service resources Number of hubs × marginal annual service cost per hub × years of service
Centre adaptation Number of Centres × incremental quantum-adaptation cost per Centre, phased
over the implementation period
Cost savings Time or resource saving per beneficiary × beneficiary population × frequency,
subject to applicable caps
Net modelled cost Total societal cost minus modelled monetised cost savings
Partial benefit-cost
ratio
Modelled monetised cost savings divided by total societal cost
Public-budget impact Relevant administrative resources plus programme expenditure and transfers,
net of any fee revenue
Financing volume Potential financing or investment activity; memorandum indicator only
Table 4.8. Principal calculation methods
All annual values are discounted at 3%. Low and high values are used in deterministic
sensitivity analysis. Where the evidence is insufficient to support a central value, the
possible impact is either excluded or shown as a separate scenario.
17.2. STANDARD COST MODEL
The model is a bottom-up Standard Cost Model covering 16 PM families, 35 live Policy
Measure variant sheets (15 variants in PO1, 16 in PO2 and in PO3). Each item identifies the
actor, activity, cost or saving category, one-off or recurrent character, start year, affected
population, frequency, person-days, labour rate, non-labour unit cost, PM variant,
low/central/high assumptions, source and evidential strength.
42
Annual costs are calculated separately for one-off labour, recurrent labour and non-labour
resources:
One-off labour cost in year t = number of affected actors × person-days per actor ×
applicable person-day rate.
Recurrent labour cost in year t = number of affected actors × annual frequency ×
person-days per event × applicable person-day rate.
Non-labour resource cost in year t = quantity of resources or activities × applicable
unit cost.
Annual costs and savings are converted to present values in the 2028 base year:
PV(X) = Σ from t = 2028 to 2037 of Xₜ / (1 + r)^(t − 2028), with r = 0.03 in the central
case.
The model reports two equivalent net concepts and keeps their signs explicit:
• Signed monetised NPV = present value of modelled savings minus present value of
total societal cost.
• Positive net modelled cost = present value of total societal cost minus present value of
modelled savings.
• Partial benefit-cost ratio = present value of modelled monetised savings divided by
present value of total societal cost.
The partial ratio is not a complete welfare benefit-cost ratio because most strategic and
capability benefits are not monetised.
17.3. CALCULATION COMMON PARAMETERS
This section sets out the equations used to calculate annual costs, present values, net present
values, staffing requirements and the equivalent annual administrative burden. All monetary
values are expressed in real 2024 prices unless stated otherwise. Factors that are not
applicable to a specific cost item are set equal to one.
17.3.1. Annual cost calculation
For a labour-based cost item i in year t, the central annual cost is calculated as:
, = × , × , × , × , ×
where:
dᵢ – person-days required per occurrence or entity;
Nᵢ,ₜ – number of relevant entities, cases or occurrences in year t;
fᵢ,ₜ – frequency per year;
pᵢ,ₜ – participation or coverage rate;
aᵢ,ₜ – share attributable to the policy option rather than the baseline; and
Rᵢ – relevant fully loaded person-day rate.
For a non-labour resource item, the annual cost is calculated as:
, − = × , × , × ,
where uᵢ is the unit cost and qᵢ,ₜ is the relevant quantity in year t. Total annual cost is the sum
of all labour and non-labour cost items:
43
= ∑ ,
=1
One-off costs are entered only in the year in which they arise. Recurrent costs are entered
from the applicable start year to the end of the assessment period, unless the measure has a
specified shorter duration.
17.3.2. Present-value calculation
For any annual stream Xₜ, the present value in the 2028 base year is calculated as:
() = ∑
(1 + )−2028
2037
2028
where r is the real discount rate. The central calculation uses r = 3%. The same formula is
applied separately to the annual benefit stream Bₜ and the annual cost stream Cₜ.
= () − ()
A positive NPV indicates that monetised benefits exceed monetised costs. For tables that
report the positive value of the net modelled cost rather than signed NPV, the following
identity is used:
= () − () = −
where NMC denotes the net modelled cost. The benefit-cost ratio is calculated as:
= ()
()
The benefit-cost ratio is reported only where PV(C) is greater than zero and the benefit and
cost estimates use the same analytical perimeter.
17.3.3. Conversion of person-days into full-time equivalents
Annual person-days are converted into full-time equivalents using 225 working days per
FTE:
=
225
where Dₜ is the total number of person-days required in year t. Peak FTE is the highest annual
FTE requirement during the assessment period:
= ∈{2028,…,2037}
These estimates indicate the workload implied by the modelled activities and do not
constitute an establishment-plan decision.
17.3.4. Equivalent annual administrative burden for One-In, One-Out reporting
The equivalent annual administrative burden is obtained by converting the present value of
the administrative-burden stream into a constant annual amount over 2028-2037 using the
same discounting convention:
= ()
∑ (1 + )−(−2028)2037 2028
where PV(AB) is the present value of the relevant administrative-burden stream. With r =
3% and ten annual observations from 2028 to 2037 inclusive, the denominator is 8.78611:
= ()
8.78611
44
This produces an equivalent constant annual amount that has the same 2028 present value
as the original burden stream. The classification of costs as OIOO-relevant remains separate
from the mathematical annualization.
17.4. COMMON VALUATION ASSUMPTIONS
Parameter Central value Treatment
Price year 2024 All monetary values expressed in real 2024 prices, except the
Commission labour-cost anchor, which keeps its 2022
comparator value (see Table 4.12).
Assessment period 2028–2037 One-off and recurrent flows assigned to the relevant year;
present-value base year 2028.
Discount rate 3% real Sensitivity at 1.5% and 4.5%.
Hours per person-day 8 Standard Cost Model convention.
Working days per
FTE
225 Applied consistently to Commission, Member State and
implementing-body staffing estimates.
Member States 27 All 27 for obligations under PO2 and PO3; for voluntary
activities, the number of participating Member States
recorded for each activity
Coordination-adoption
share
64% Share of the addressed population adopting a structured
coordination output; Chips Act 2.0 IA survey used as a
proxy. Sensitivity 53-75%.
Voluntary-
participation share
55% Share of the eligible population taking up a voluntary tool;
expert judgement, no observed quantum rate. Sensitivity 40-
75%. Drives 11 model items.
Baseline
fragmentation pool
EUR
110m/year
Upper bound on monetised coordination/duplication savings;
sensitivity EUR 66–176m/year. Non-binding ceiling on
coordination and duplication savings (sensitivity EUR 66-
176m/year); modelled savings stay far below it, so it is not
evidence that they occur.
Table 4.9. Common valuation assumptions
At 3%, the discounted annuity factor for recurrent annual administrative burdens over 2028–
2037 is approximately 8.78611. The equivalent annual OIOO burden is the NPV of the
administrative burden divided by this factor.
Assumption Definition and
denominator
Low / central
/ high
Source Where used and
sensitivity
Voluntary-
participation
share
Share of the eligible
beneficiaries taking
up a voluntary tool;
denominator = the
item's population
(e.g. 40 firms
seeking finance a
year; 115
programme units)
40% / 55% /
75%
Benchmarks: a costly
joint project drew 14
of 27 Member States
(52%; IPCEI on
microelectronics and
communication
technologies, 2023); a
low-cost pledge drew
11 at signature (41%)
and all 27 by mid-
2025 (European
Declaration on
Quantum
Technologies).
Central value set near
the costly-
commitment
benchmark, as the
savings need effort
from participants; the
range spans both; no
observed take-up rate
specifically for
quantum support
tools.
Savings only (Table
4.16): nine PO1 lines
(EUR 3.99m of
5.39m); PM10b under
PO2 (0.44m of
13.59m); PM10c
under PO3 (0.69m).
Also inside the
overlap-adjusted
factor of PM6b
navigation (2.48m,
PO2 and PO3) and of
two PO1 lines, which
the participation cases
do not vary.
Participation cases:
Table 4.27
45
Coordination-
adoption share
Share of the
addressed population
adopting a structured
coordination output;
for PM1a it is
applied to all 27
Member States as a
participation share
53% / 64% /
75%
Chips Act 2.0 impact
assessment,
stakeholder survey
(Synopsis Report,
Figure 11): 75% of
authorities, 53% of
research and
technology
organisations; central
value = mid-point,
range = the two
values. Stated
intentions in the
semiconductor
ecosystem;
transferability to
quantum coordination
not demonstrated.
PO2: nine savings
lines, EUR 9.05m of
13.59m (Table 4.16);
PO3: nine lines, EUR
9.25m of 14.04m;
PO1: PM1a Member
State participation (27
× 0.64), a cost of EUR
0.35m. Participation
cases: Table 4.27
Member State
participation
Number of Member
States performing an
activity. Obligations
(PO2, PO3): all 27.
Opt-in and PO1
activities: those
expected to take part
(PM7 buyer group 5;
PM7b 8
procurements a year;
PM1a exchanges 27
× 0.64, about 17).
Other PO1 Member
State lines (Board,
mapping,
monitoring, skills,
international
coordination)
assume all 27, an
upper bound for a
voluntary option.
Obligations:
27; PM7 buyer
group: 4 / 5 / 6;
PM1a: 27 ×
53% / 64% /
75%
Tool #58 (full
compliance with
obligations);
participation
benchmarks as for the
voluntary-
participation share.
All Member State
cost lines; the all-27
assumption carries
EUR 11.40m of the
EUR 14.51m of PO1
Member State costs
Quantum-safe
preparedness
(PM13b;
retained under
PO3)
Biennial EU
preparedness
assessment with
information from the
27 Member States;
coordinated
exercises every two
years; PQC
requirements in
public procurement,
applied in 60% of
270 relevant
procedures a year;
Commission work
on the function
Per cycle and
Member State:
information
30 days,
exercises 6
days; per
procedure: 3
bidder-days, 2
authority-
days;
Commission
4.0 FTE. Low
/ high: 0.5 / 1.5
times
(Commission
work 0.67 /
1.5 times)
Commission estimate
by task (Table 4.15);
Member State, bidder
and authority days set
by analogy with other
information
obligations in the
model; no observed
data on PQC
procurement.
PO2: PM13b EUR
8.72m NPV, of which
Commission 4.57m,
Member States 2.75m
and businesses 1.40m
(1.23m within One-
In, One-Out); PO3:
retained in PM13c.
PM13c
covered
entities
Critical public
authorities (60%)
and operators (40%)
subject to binding
PQC migration
duties
250 / 450 / 800 Scoping assumption;
depends on the scope
of the binding duties;
Low
PO3 only: PO3 cost
EUR 141.6m /
163.6m / 202.1m
NPV
46
PM13c reuse
of existing
plans
Share of one-off
migration-plan effort
already covered by
existing inventories
and plans (baseline
deduction on one-off
rows only)
5% / 25% /
44%
Expert assumption. PO3 only: EUR -1.8m
/ +1.9m NPV
Hubs costed
(Central case)
Existing hubs
providing marginal
public-facing
services from 2030
5 (ambition up
to 8)
Illustrative costing
assumption
(Commission choice)
8 hubs: +EUR 10.2m
NPV
Marginal
service per
hub-year
Additional public-
facing service
beyond ordinary
operation
EUR 0.25m /
0.50m / 1.00m
EuroCC competence
centres: EUR 57m
over two years for 33
centres, half EU-
funded (about EUR
0.86m per centre-
year); EDIH: EU
funding of EUR 0.5–
1.0m per hub-year.
Central value = EU
share of an EDIH-
type service layer at a
facility whose
ordinary operation
stays in the baseline.
PO2, PO3: 5 hubs ×
EUR 0.50m a year,
2030–2037 = EUR
17.04m NPV. RC-L /
RC-H: Table 4.26
Centres costed
and
adaptation per
Centre
Existing or suitable
Centres adapted
once, 2028-2030
15 (ambition
27); EUR
0.10m / 0.30m
/ 0.75m
Set against EDIH
grant levels (EU
funding of EUR 0.5–
1.0m per hub-year)
for a one-off
adaptation of an
existing facility.
PO2, PO3: 15 × EUR
0.30m, a third a year
in 2028–2030 = EUR
4.37m NPV. 27
Centres: +EUR 3.5m
NPV
Specialist top-
up per Centre-
year
Additional specialist
support from 2030,
high case only
0 / 0 / EUR
0.20m
Policy choice Included in RC-H
only
Commission
day rate
EUR 130,000 per
FTE-year incl.
overheads / 225
productive days
(2022 comparator,
not re-based)
EUR 533 / 578
/ 636
Comparable IA
(SWD(2022) 286);
Medium; verified
salary-scale factor
1.1014 applied to the
high case only
Price-year case: PO2
+EUR 3.00m NPV
Member State
day rate
Fully loaded national
official
EUR 320 / 380
/ 440
Standard Cost Model
of the PPMI/d-fine
support study.
PO2 EUR 101.1m /
r8m NPV
Commission
staffing by
function
Commission staff
needed for each
function (e.g.
dependency
monitoring, EU
programming
chapter, quantum-
safe preparedness,
Quantum Strategy
Board secretariat,
investment pipeline,
supervision of
Strategic Projects)
PO2: 26.0
FTE on
average (22.3
in 2028, 26.2
to 26.7 a year
from 2029);
uncertainty in
the
probabilistic
analysis
(Table 4.30)
Standard Cost Model
of the support study;
comparable functions
in other impact
assessments and
bodies (Chips Act 2.0,
Critical Raw
Materials Board);
Commission
estimates where
neither applies.
Commission staff
cost.
Fragmentation
pool (ceiling)
EU and national
public quantum
funding x
recoverable
duplication share
EUR 66m /
110m / 176m a
year
COM(2025) 363
funding base x 5%
diagnostic share.
Non-binding;
stronger-baseline case
changes savings
instead
47
Table 4.10. Register of material assumptions
17.5. CENTRAL IMPLEMENTATION AND PROGRAMME ASSUMPTIONS
The central case assumes reuse of existing infrastructures. The numbers of hubs and Centres
are costing assumptions rather than predetermined policy commitments. The actual facilities
would be determined through capacity and gap assessments, transparent selection
procedures and future implementation decisions.
Parameter Low Central High Period and analytical
treatment
Existing hubs used for
costing
5 5 5 Illustrative network size; no new
construction in the central case
Marginal public-facing
service per hub
EUR
0.25m/year
EUR
0.50m/year
EUR
1.00m/year
2030–2037; counted as a real
societal resource
Total marginal hub service EUR
1.25m/year
EUR
2.50m/year
EUR
5.00m/year
Five hubs; ordinary facility
operation remains in the baseline
Existing or suitable
Centres used for costing
15 15 15 Illustrative number; not a
commitment to designate
particular Centres
Quantum adaptation per
Centre
EUR
0.10m
EUR
0.30m
EUR
0.75m
Phased over 2028–2030; counted
as a real societal resource
Total Centre adaptation EUR
1.50m
EUR
4.50m
EUR
11.25m
Nominal amount before
discounting
Specialist top-up per
Centre
EUR 0 EUR 0 EUR
0.20m/year
2030-2037; high case (RC-H)
only; together with the higher
unit costs it raises the module to
EUR 65.45m NPV
PO2 substantive
programme-resource
envelope
EUR 5.19–
6.12bn EU
2028–2034 planning range;
detailed allocation in part D of
this Annex; memorandum only
and excluded from the Standard
Cost Model
Excellence Network
coordination envelope
EUR
0.50m/year
EUR
1.00m/year
EUR
1.50m/year
2029–2037; coordination
resources
Financing mobilisation
target
EUR 1bn EUR 2bn EUR 3bn Financing-volume indicator
Illustrative co-financing
leverage
1.5× 2.5× 4.0× Indicator, not a monetised benefit
Fragmentation/duplication
pool
EUR
66m/year
EUR
110m/year
EUR
176m/year
Used to cap coordination savings
PQC migration
expenditure
EUR 3bn EUR 6.5bn EUR 10bn Baseline context for 2025–2035;
not attributed to the Quantum Act
Table 4.11. Principal implementation and programme parameters
These are model assumptions rather than observed population data. The low and high values
show the range tested.
Under the central assumptions, marginal services through five existing hubs (EUR 0.50
million per hub-year, 2030-2037) have an NPV of EUR 17.04 million and the one-off
adaptation of fifteen Centre (EUR 0.30 million each, phased equally over 2028-2030) has
an NPV of EUR 4.37 million. Their combined central NPV is therefore EUR 21.41 million
under PO2 and PO3. The high case raises the unit costs to EUR 1.00 million per hub-year
and EUR 0.75 million per Centre and adds the specialist top-up, for EUR 65.45 million in
total: it changes the scope and timing of the support, not only two unit costs. The rollout
beyond five hubs and fifteen Centres is not costed (see Part A).
17.6. LABOUR-COST PROXIES
Actor Central rate Basis
Commission and Union
services
EUR
577.78/person-day
EUR 130,000 per FTE-year including overheads,
from the European Media Freedom Act IA
48
(SWD(2022) 286), divided by 225 productive
days. Used at its 2022 value; the verified 2022-
2024 salary-scale factor (1.1014) gives EUR
636.34 which is used in the high case.
Member State authorities EUR 380/person-
day
Fully loaded national official; rate from the
Standard Cost Model of the PPMI/d-fine support
study; sensitivity EUR 320-440.
Implementing bodies and
operators
EUR
261.60/person-day
Applied to the programme, facility and delivery
functions of implementing bodies and operators,
including calls and network coordination or
oversight under PM2b, PM4b and PM6b. Rate
from the Standard Cost Model of the PPMI/d-fine
support study
Businesses and private actors EUR 324/person-
day
Applied to business information and participation
activities. Rate from the Standard Cost Model of
the PPMI/d-fine support study.
External experts EUR 450/person-
day
Applied where external technical expertise is
purchased. Rate from the Standard Cost Model of
the PPMI/d-fine support study.
Table 4.12. Labour-cost proxies
17.7. STAFF-TIME AND FTE ASSUMPTIONS
Annual FTE = annual person-days / 225. The estimates indicate the resources implied by
the modelled activities. They do not constitute decisions on the Commission establishment
plan or national staffing allocations and remain sensitive to the final allocation of
responsibilities and the extent to which existing teams can absorb tasks.
The total number of FTEs were derived from the estimated effort required in person-days
for the performance of the tasks of each PM.
Resource indicator PO1 PO2 PO3
Commission peak FTE 17.0 26.7 31.7
Commission average FTE, 2028–2037 16.8 26.0 30.8
Member State peak FTE, EU aggregate 19.9 42.3 117.7
Member State average FTE, EU aggregate 19.4 41.2 86.5
Member State peak FTE per Member State 0.74 1.57 4.36
Member State average FTE per Member State 0.72 1.52 3.20
Table 4.13. Indicative administrative resource requirements
The Commission FTEs needs are broken down by each Policy Measure and Policy Option
are as follows:
PM Measure PO1 PO2 PO3
Avg Peak Avg Peak Avg Peak
PM1 Common programming
framework 2.76 3.56 4.08 4.80 4.08 4.80
PM2 Quantum S&T Excellence
Network 1.24 1.33 0.03 0.32 0.03 0.32
PM3 Quantum Grand Challenges 0.36 0.36 0.53 0.59 0.53 0.59
PM4 Technology and Innovation
Hubs 0.64 0.67 0.00 0.00 0.00 0.00
PM5 Strategic Quantum Projects 0.97 1.00 2.37 2.50 2.37 2.50
PM6 Competence and Acceleration
Centres 0.65 0.67 1.00 1.00 1.00 1.00
PM7 Innovation procurement 0.30 0.33 0.64 0.71 1.41 1.64
PM8 Standards, benchmarking and
assurance 0.63 0.64 0.91 0.96 0.91 0.96
PM9 Skills and mobility 1.20 1.40 1.00 1.00 1.00 1.00
PM10 Quantum Investment Service
Desk 1.40 1.40 2.89 2.90 5.44 6.80
49
PM11 Strategic intelligence and
dependency monitoring 2.53 2.67 4.26 4.53 5.28 5.73
PM12 Quantum Business Platform 0.10 0.11 0.19 0.21 0.19 0.21
PM13 Quantum-safe preparedness 0.00 0.00 4.00 4.00 4.41 4.53
PM14 Strategic international
cooperation 0.60 0.60 1.00 1.00 1.00 1.00
PM15 Quantum Strategy Board 1.39 1.87 2.92 3.92 2.92 3.92
PM16 European Quantum Alliance 2.05 2.53 0.18 0.18 0.18 0.18
Total 16.8 17.0 26.0 26.7 30.8 31.7
Table 4.14. European Commission estimated effort in FTEs breakdown per PM
Table 4.14 converts the Commission person-days of the cost items in Table 4.15 into FTE
(225 days per FTE). For PO2 the requirement is 22.3 FTE in 2028, 26.2 in 2029 and 26.4 to
26.7 a year from 2030. Average FTE is the mean of the ten annual values 2028-2037; a
measure's peak is its own highest year, and the package peak in the Total row is the highest
annual package total, which is lower than the sum of measure peaks (PO2: 26.7 against
28.6). The estimates are task-equivalent workload, not establishment-plan posts.
Table 4.15 sets out the Commission functions behind the PO2 staffing estimate in Table
4.14: what the Commission does and what others deliver, the scale of the activity, the basis
for the estimate, and the start-up and continuing requirement. Repeatable work is calculated
from volumes and days per case; continuing secretariat, coordination and supervision work
rests on the Standard Cost Model of the support study, on comparable functions in other
impact assessments and bodies or, where neither applies, on Commission estimates. The
figures are task-equivalent workload, not establishment-plan posts; their uncertainty is
covered by the probabilistic analysis (Table 4.30).
Function Commission role and
scope
Scale Basis for the
estimate
FTE
2028
FTE
2029–
2037
(average
)
FTE 2028–
2037 (total
average, Table
4.14)
Strategic
intelligence
and
dependency
monitoring
(PM11b)
Sector taxonomy and
registry (2028); annual
dependency dashboard
and early warning;
critical-components list;
verification of the
reports requested from
firms; scenario exercises.
Member States supply
national data.
27 national data returns; 45
reporting firms; one
dashboard release a year
Standard Cost
Model of the
support study;
critical-
components list on
the model of the
Critical Raw
Materials Act;
verification and
scenario exercises:
Commission
estimates
2.00 4.51 4.26
Common
programmi
ng
framework
(PM1b)
National-chapter
template (2028); annual
EU chapter and
programme-alignment
report; assessment of
non-aligned national
chapters (comply-or-
explain).
27 national chapters; 2
Joint Undertakings
Template:
Standard Cost
Model of the
support study; EU
chapter and
alignment report
scaled from the
Chips Act 2.0
impact assessment;
comply-or-explain:
Commission
estimate
4.80 4.00 4.08
50
Quantum-
safe
preparedne
ss (PM13b)
Biennial PQC
preparedness assessment
(the first by the end of
2028) on the basis of
information from
Member States and
Union entities;
coordinated exercises;
guidance and follow-up
on PQC requirements in
public procurement;
cryptanalysis follow-up;
coordination with the
NIS Cooperation Group
and other cybersecurity
structures. Member
States supply the
information and take part
in the exercises;
contracting authorities
apply the procurement
requirements.
27 Member States; one
assessment and one
exercise every two years
Commission
estimate by task:
assessment cycle
300 days,
exercises 160,
procurement 140,
coordination 120
and
implementation
support 180 a year
4.00 4.00 4.00
Quantum
Strategy
Board
(PM15b)
Chair and secretariat:
set-up, governance
calendar, plenary and
sub-group papers,
written procedures,
records and
transparency,
coordination of Member
State positions,
monitoring, reporting
and follow-up. Member
States and the Joint
Undertakings bear their
own participation.
27 Member States; 4
plenaries and 5 sub-groups
a year
Secretariat of 2
FTE, as for
comparable boards
(Critical Raw
Materials Board);
meetings under the
horizontal rules on
Commission
expert groups; sub-
groups 5 × 30 days
a year
(Commission
share)
3.92 2.81 2.92
Quantum
Investment
Service
Desk
(PM10b)
Investment pipeline:
intake, eligibility and
assessment, decision
support, monitoring of
supported cases and
reporting; due diligence;
opinions on strategic-
capability transactions.
Investment decisions
remain with the financial
institutions concerned.
About 12 investment cases
and 1 strategic-capability
transaction a year
Due diligence: 15
days per case
(Standard Cost
Model of the
support study);
pipeline
coordination: 2
FTE, Commission
estimate
2.80 2.90 2.89
Strategic
Quantum
Projects
(PM5b)
Designation framework
(2028); assessment of
applications, designation
decisions, monitoring of
designated projects,
withdrawal and
escalation.
About 9 applications a year
in 2029–2033; up to 15
designated projects
Framework:
Standard Cost
Model of the
support study;
designation and
supervision sized
on the caseload
(2.5 FTE from
2029)
1.20 2.50 2.37
Strategic
internation
al
cooperation
(PM14b)
Identification and
assessment of partners,
preparation of
cooperation frameworks,
follow-up and reporting.
4 partner assessments a
year
Partner
assessments 4 × 25
days a year and
framework
conclusions:
Commission
estimates
1.00 1.00 1.00
51
Oversight
of the
Centre
network
(PM6b)
Residual oversight of the
network run by an
implementing body:
framework approval,
work-programme and
performance review, hub
supervision, sandbox
oversight, escalation,
reporting and evaluation.
15 Centres; 5 hubs; 3
sandbox cycles a year
Commission
estimate of the
oversight retained
when the network
is run by an
implementing
body
1.00 1.00 1.00
Skills and
mobility
(PM9b)
Coordination of skills,
mobility, training and
user-capability actions;
annual user-capability
report.
Annual cycle of Union
skills and mobility actions
Commission
estimate, by
reference to the
coordination of the
European Digital
Innovation Hubs
and EuroCC
1.00 1.00 1.00
Other
measures
(PM2b,
PM3b,
PM7b,
PM8b,
PM12b,
PM16b)
Grand Challenge gate
reviews and benchmarks;
procurement templates
and support to buyer
groups; standardisation
requests and
benchmarking; platform
matchmaking; Alliance
linkage; review of the
Excellence Network's
legal form.
3 Grand Challenges; 8
supported procurements, 2
standardisation requests
and 4 matchmaking events
a year
Repeatable work:
volume × days per
case (40 per gate
review, 20 per
supported
procurement, 80
per standardisation
request, 30 per
matchmaking
event; where work
is shared, the
Commission share
only); other work:
Commission
estimates
0.60 2.68 2.48
Total PO2 22.32 26.40 26.00
Table 4.15. Commission staffing by function, PO2 (FTE)
17.8. TREATMENT OF BENEFITS
Benefits are quantified or monetised only where the causal mechanism is sufficiently clear
and the underlying assumption can be tested, otherwise, the benefits are treated qualitatively
rather than quantitatively.
17.9. DIRECT ADMINISTRATIVE SAVINGS
Direct savings may arise from:
• common templates;
• reduced duplicate reporting;
• reuse of existing programme data;
• a single-entry point for infrastructure access;
• common specifications; and
• reduced search, application or negotiation time.
Savings are calculated using the same staff-time and labour-cost methodology as
administrative costs.
Each monetised saving line applies the structure: annual saving = beneficiary population x
days saved per unit x take-up or participation share x beneficiary day rate, from the start
year to 2037, discounted to 2028. Take-up and additionality are embedded once in the
registered share. Worked example (PM10b, financing search): 40 firms x 55% x 8 days x
EUR 324 = EUR 57,024 a year from 2029 to 2037, or EUR 443,995 NPV. Table 4.16 sets
out every monetised saving line of the three options.
52
17.10. QUANTIFIED NON-MONETARY OUTCOMES
Where monetisation would require speculative assumptions, the assessment uses physical
or financial outcome indicators.
Channel Calculation Illustrative result
Infrastructure
access
40–120 projects × one to two months
earlier access or qualification
40–240 project-months brought forward
annually
Scale-up finance EUR 100m Union risk-bearing finance
× 1.5–3.5 private leverage
EUR 150–350m private co-investment
Innovation
procurement
EUR 100m procurement × empirical
supplier-revenue and investment
coefficients
EUR 25–50m persistent supplier revenue
and EUR 10–20m additional private
investment
Supply-chain
resilience
191 observed delay days × 10–30%
avoidable share
19–57 days saved per comparable affected
project
Table 4.16. Principal quantified benefit scenarios
These scenarios use different units and must not be added together.
The infrastructure and resilience scenarios are based partly on observed quantum-sector
evidence. The finance and procurement scenarios are informed by comparable instruments
and cross-sector studies and are therefore assigned lower confidence regarding their
magnitude.
Table 4.17 lists every monetised saving line of the three options. Annual saving = population
× days saved per unit × take-up share (× overlap adjustment) × beneficiary day rate, from
the start year to 2037, discounted to 2028. The take-up shares are the coordination-adoption
share (0.64), the voluntary-participation share (0.55), sandbox output adoption (0.40),
platform participation (0.50 under PO1, 0.70 under PO2 and PO3) and template and
benchmark uptake (0.80). The overlap adjustment (0.65 or 0.85) removes the part of an
effect already counted under another measure.
Measure Saving line Beneficiary Options Population × days
saved × take-up (×
overlap) × day rate
Years Annual saving
(EUR)
NPV (EUR
million)
PM1a Reduced
duplication
(voluntary
uptake)
Member
States
PO1 115 × 8 days × 0.55
× EUR 380
2029–
2037
192,280 1.50
PM1b Reduced
duplication in
programme
planning
Member
States
PO2,
PO3
115 × 16 days × 0.64
× EUR 380
2029–
2037
447,488 3.48
PM2a Avoided
duplication
Implementin
g bodies
PO1 25 × 5 days × 0.55 ×
EUR 261.60
2030–
2037
17,985 0.12
PM2b Avoided
duplication of
frontier
coordination
Implementin
g bodies
PO2,
PO3
30 × 8 days × 0.64 ×
EUR 261.60
2030–
2037
40,182 0.27
PM4a Qualification
access
(voluntary)
Businesses PO1 80 × 4 days × 0.55 ×
EUR 324
2030–
2037
57,024 0.39
PM4b Avoided
duplicated
qualification and
testing
Businesses PO2,
PO3
120 × 10 days × 0.64
× EUR 324
2030–
2037
248,832 1.70
PM5a Visibility and
coordination
Businesses PO1 15 × 4 days × 0.55 ×
EUR 324
2030–
2037
10,692 0.07
53
Measure Saving line Beneficiary Options Population × days
saved × take-up (×
overlap) × day rate
Years Annual saving
(EUR)
NPV (EUR
million)
PM5b Coordination
and priority
access, wave 1
Businesses PO2,
PO3
6 × 12 days × 0.64 ×
EUR 324
2030–
2037
14,930 0.10
PM5b Coordination
and priority
access, wave 2
Businesses PO2,
PO3
9 × 12 days × 0.64 ×
EUR 324
2032–
2037
22,395 0.11
PM6a Navigation
(overlap-
adjusted ×0.85)
Businesses PO1 250 × 3 days × 0.55
× 0.85 × EUR 324
2030–
2037
113,602 0.77
PM6b Navigation and
first access
(overlap-
adjusted ×0.85)
Businesses PO2,
PO3
400 × 6 days × 0.55
× 0.85 × EUR 324
2030–
2037
363,528 2.48
PM6b Sandbox
avoided rework
Businesses PO2,
PO3
36 × 8 days × 0.40 ×
EUR 324
2031–
2037
37,325 0.22
PM7a Templates Member
States
PO1 5 × 4 days × 0.55 ×
EUR 380
2030–
2037
4,180 0.03
PM7b Template and
evaluation
savings
Member
States
PO2 8 × 5 days × 0.64 ×
EUR 380
2030–
2037
9,728 0.07
PM7c Templates Member
States
PO3 8 × 5 days × 0.64 ×
EUR 380
2030–
2037
9,728 0.07
PM8a Qualification
(guidance
uptake)
Businesses PO1 100 × 1 days × 0.80
× 0.85 × EUR 324
2030–
2037
22,032 0.15
PM8b Avoided
qualification
cost
Businesses PO2,
PO3
150 × 3 days × 0.80
× 0.85 × EUR 324
2030–
2037
99,144 0.68
PM10a Financing
search
Businesses PO1 30 × 5 days × 0.55 ×
EUR 324
2029–
2037
26,730 0.21
PM10b Financing
search costs
Businesses PO2 40 × 8 days × 0.55 ×
EUR 324
2029–
2037
57,024 0.44
PM10c Financing
search costs
Businesses PO3 50 × 10 days × 0.55
× EUR 324
2029–
2037
89,100 0.69
PM11a Avoided
duplicated
monitoring
Member
States
PO1 60 × 6 days × 0.55 ×
EUR 380
2030–
2037
75,240 0.51
PM11b Avoided
duplicated
national
monitoring
Member
States
PO2 60 × 10 days × 0.64
× EUR 380
2030–
2037
145,920 0.99
PM11c Avoided
duplicated
monitoring
Member
States
PO3 60 × 12 days × 0.64
× EUR 380
2030–
2037
175,104 1.19
PM12a Partner search
(overlap-
adjusted ×0.65)
Businesses PO1 180 × 2 days × 0.50
× 0.65 × EUR 324
2030–
2037
37,908 0.26
PM12b Partner search
(overlap-
adjusted ×0.65)
Businesses PO2,
PO3
180 × 4 days × 0.70
× 0.65 × EUR 324
2030–
2037
106,142 0.72
PM14a Avoided
duplicated
engagement
Member
States
PO1 10 × 2 days × 0.55 ×
EUR 380
2029–
2037
4,180 0.03
PM14b Avoided
duplicated
bilateral
engagement
Member
States
PO2,
PO3
15 × 5 days × 0.64 ×
EUR 380
2029–
2037
18,240 0.14
54
Measure Saving line Beneficiary Options Population × days
saved × take-up (×
overlap) × day rate
Years Annual saving
(EUR)
NPV (EUR
million)
PM15a Prioritisation
(voluntary
uptake)
Member
States
PO1 115 × 6 days × 0.55
× EUR 380
2029–
2037
144,210 1.12
PM15b Faster
prioritisation,
reduced
duplication
Member
States
PO2,
PO3
115 × 10 days × 0.64
× EUR 380
2029–
2037
279,680 2.18
PM16a Partner search
and consortium
building
(overlap-
adjusted ×0.65)
Businesses PO1 80 × 3 days × 0.55 ×
0.65 × EUR 324
2029–
2037
27,799 0.22
Total PO1 (13
lines)
5.39
Total PO2 (14
lines)
13.59
Total PO3 (14
lines)
14.04
Table 4.17. Monetised saving lines by option (NPV 2028–2037)
Table 4.18 reconciles the PO2 monetised savings by mechanism and by beneficiary.
Breakdown of PO2 modelled savings EUR million
NPV
By mechanism: coordination and duplication avoidance (capped by the
fragmentation pool, Table 4.10)
6.66
By mechanism: other time and transaction-cost savings 6.93
By beneficiary: Member State authorities 6.86
By beneficiary: businesses 6.45
By beneficiary: implementing bodies 0.27
Total modelled savings (each view) 13.59 Table 4.18. PO2 modelled savings by mechanism and by beneficiary (EUR million NPV, 2028–2037)
17.11. QUALITATIVE BENEFITS
The following benefits are assessed principally through structured qualitative analysis:
• research and innovation spillovers;
• ecosystem development;
• industrial capability;
• strategic autonomy and economic security;
• trust and interoperability;
• quantum-safe preparedness;
• employment and skills;
• territorial effects;
• environmental effects; and
• fundamental rights.
The absence of monetisation does not imply that these effects are immaterial. It reflects
insufficient evidence to assign a robust monetary value.
55
18. PART C - RESULTS, UNCERTAINTY AND QUALITY ASSURANCE
18.0. ECONOMIC IMPACTS
18.0.1. Regulatory, administrative and indirect costs
The Standard Cost Model estimates the incremental costs of governance, planning,
applications, assessment, monitoring, reporting, information provision, programme
administration and enforcement. It also separately identifies the possible price premium
associated with European procurement conditions.
The model does not include the substantive value of grants, infrastructure investment,
procurement contracts, vouchers or capital committed through financial instruments. Such
expenditure depends on future budgetary decisions and is reported separately as
memorandum information.
Central NPV, EUR million, 2028-2037 PO1 PO2 PO3
One-off administrative cost 0.00 1.37 8.44
Recurrent administrative cost 0.65 31.80 54.50
One-off adjustment cost 0.00 0.00 0.32
Recurrent adjustment cost 0.00 0.00 18.38
Enforcement cost (Commission and
Member State authorities)
0.79 5.33 9.84
Implementation cost: Member State
authorities in opt-in measures
14.06 3.40 3.40
Implementation cost: Commission
administration and non-staff resources,
implementing bodies, experts
23.16 39.30 43.95
Implementation cost: incremental
Hub/Centre resources
0.00 21.41 21.41
Participation by firms without a legal
requirement (not a compliance cost)
2.77 3.33 3.33
Total societal cost 41.44 105.92 163.56
Modelled monetised savings 5.39 13.59 14.04
Net modelled cost 36.05 92.34 149.52
Partial benefit-cost ratio 0.13 0.13 0.09
Table 4.19. Modelled costs by category and option. Source: Commission-services Standard Cost Model.
Central estimates, real prices and NPV over 2028–2037.
Interpretation of the monetary results. All figures are central net present values for 2028-
2037. Total societal cost covers the incremental real-resource costs of operating the
framework, including EUR 21.41 million of illustrative marginal service and adaptation
resources for existing hubs and Centres under PO2 and PO3. It excludes substantive grants,
procurement expenditure and capital committed through financial instruments. Modelled
monetised benefits include only demonstrable time and resource savings. They exclude
wider strategic, innovation, resilience, skills, infrastructure-service and security benefits.
Net modelled cost is calculated as total societal cost minus modelled cost savings. A positive
figure therefore represents the residual cost under the partial monetised assessment; it does
not mean that the option produces no wider benefits. Adjustment costs arise only under PO3
(EUR 7.20 million for businesses and EUR 11.50 million for public administrations).
Implementation costs count as enforcement costs under Tool #56: the effort of Member State
authorities in measures they opt into, Commission administration and non-staff resources
(platform build and operation), implementing-body delivery, external experts and the
Hub/Centre resources (PO2: EUR 3.40 million, 25.65 million, 8.44 million, 7.44 million,
0.55 million and 21.41 million). Time that firms choose to spend in the new structures
without a legal requirement is not a compliance cost but is part of the societal cost (PO2:
EUR 3.33 million).
56
The estimates were calculated using a bottom-up Standard Cost Model. For each measure,
the number of affected actors was combined with the expected frequency, staff time, labour
cost and other unit-resource requirements, distinguishing one-off and recurrent costs.
Annual costs were expressed in 2024 prices and discounted at 3% over 2028-2037. Existing
infrastructure and ordinary operating costs are included in the baseline; only incremental
service and adaptation resources are counted. Transfers and financing volumes are reported
separately.
The central case reuses existing infrastructure. Five hubs and fifteen existing or suitable
competence/acceleration centres are illustrative costing assumptions, not predetermined
policy commitments. Final numbers depend on capacity and gap assessment, competitive
selection and operator-level cost validation. Construction and ordinary operating costs of
existing facilities remain in the baseline. Procurement-related price effects are excluded
from the central societal-cost totals. A separate low-confidence PO3 procurement premium
deadweight stress scenario is approximately EUR 11.04 million NPV. It is excluded from
the central societal-cost estimate and does not change the option ranking3.
PO1 has the lowest cost because it relies mainly on voluntary coordination, guidance and
information tools. PO2 entails higher costs for structured governance, Strategic Project
designation, common facility arrangements, procurement coordination, standards, PQC
preparedness assessment, exercises and procurement requirements and targeted dependency
reporting. PO3 retains the PO2 variants for PM1-PM6, PM8, PM9, PM12 and PM14-PM16
and applies higher-intensity variants only to PM7, PM10, PM11 and PM13. These add
stronger strategic procurement conditions, targeted mandatory assurance, dedicated mandate
or risk-bearing finance capacity, wider mandatory dependency reporting and binding PQC-
preparedness duties.
Cost bearer PO1 PO2 PO3
Commission and Union services EUR 22.32m EUR 38.07m EUR 43.47m
Member State authorities/public buyers EUR 14.51m EUR 30.81m EUR 64.54m
Implementing bodies/JUs EUR 1.81m EUR 6.26m EUR 6.37m
Existing Hub/Centre operators: marginal
services and adaptation
EUR 0.00m EUR 21.41m EUR 21.41m
Businesses/private actors EUR 2.77m EUR 8.83m EUR 26.94m
External experts EUR 0.03m EUR 0.55m EUR 0.83m
Total EUR 41.44m EUR 105.92m EUR 163.56m
Table 4.20. Distribution of costs by bearer
Cost category, EUR million NPV PO1 PO2 PO3
Administrative burden on businesses 0.00 5.50 16.41
of which within One-In, One-Out 0.00 5.46 16.28
Administrative burden on public administrations 0.45 26.06 44.93
Administrative burden on implementing bodies 0.20 1.60 1.60
Business adjustment costs 0.00 0.00 7.20
Adjustment costs for public administrations 0.00 0.00 11.50
Enforcement costs (Commission and Member State
authorities)
0.79 5.33 9.84
Implementation costs: Member State authorities in
measures they opt into
14.06 3.40 3.40
Implementation costs: Commission administration 18.39 25.65 29.91
3 The procurement-premium estimate depends on expert-judgement parameters concerning the affected
procurement share, possible price difference and annual coordinated-pipeline value. The PM7c fiche should
define the eligible geographical scope, market-availability test, exceptions and relationship with Directive
2014/24/EU and Directive 2014/25/EU on public procurement; Regulation (EU) 2022/1031, the WTO
Agreement on Government Procurement and relevant Union international agreements.
57
Implementation costs: external experts financed by the
Commission
0.03 0.55 0.83
Implementation costs: implementing-body delivery 1.61 4.66 4.77
Implementation costs: Commission non-staff resources
(platform build and operation)
3.14 8.44 8.44
Implementation costs: incremental Hub/Centre resources
(publicly funded operators)
0.00 21.41 21.41
Participation by firms without a legal requirement (not a
compliance cost)
2.77 3.33 3.33
Total societal cost 41.44 105.92 163.56 Table 4.21. Costs by category, reconciled with total societal cost
Displayed bearer components are individually rounded; headline totals are calculated from
unrounded workbook values. Approximately 65.0% of PO2 societal costs fall on
Commission/Union services and Member State authorities. Including implementing bodies,
facility operators and Commission-financed external experts, the public and implementation
share is approximately 91.7%. Business-facing costs are concentrated on applicants,
beneficiaries, designated Strategic Projects and actors subject to narrowly scoped
information requirements. They do not apply to the general quantum-business population.
Under the One-In, One-Out methodology, new administrative burdens on businesses are
estimated at EUR 5.46 million NPV under PO2, equivalent to approximately EUR 0.621
million annually, and EUR 16.28 million NPV under PO3, equivalent to approximately EUR
1.853 million annually4. These figures include the requirements for taking part in regulatory
sandboxes and the business platform (EUR 0.68 million) and the evidence that bidders
provide on PQC requirements in public procurement (EUR 1.23 million). Documentation
for investment support under PM10 (EUR 0.05 million under PO2 and EUR 0.13 million
under PO3) is an administrative cost but, as an application for financial support, is not offset.
Common templates, digital procedures, proportionate thresholds, technical assistance and
once-only reuse of information are expected to reduce costs. Their effects are included
within the modelled savings and are not counted separately under an additional
simplification measure.
4 European Commission, Better Regulation Toolbox, 2025, Tools #56, #58 and the One-In, One-Out
methodology. Detailed activities, populations, frequencies, per-firm estimates and bearer allocations are
provided in this Annex.
58
Table 4.22 shows how each cost line of Table 4.21 is calculated, for each option, with its
main inputs. Annual values are discounted to 2028 at 3%: the discount factors sum to
8.78611 over 2028–2037, 7.78611 over 2029–2037 and 6.81524 over 2030–2037.
Cost line PO1 PO2 PO3 Calculation and main inputs (EUR million NPV unless stated)
Administrative
burden on businesses
0.00 5.50 16.41 Firms × person-days × EUR 324 a day (Table 4.15). PO2: Union
funding 2.10 (PM1b metadata from 180 funded beneficiaries: 180 ×
3.5 days = EUR 204,120 in 2028, then 180 × 3.75 days = EUR
218,700 a year; PM3b reporting by 15 consortia, 0.19); Strategic
Project designation 0.92 (applications 0.33, reporting 0.48, safeguards
0.10); supported procurement 0.07 (10 bidders × 3 days a year); PQC
requirements in public procurement 1.23 (evidence from bidders, 270
procedures × 60% × 3 days a year from 2029); targeted requests 0.48
(45 firms × 3.5 days in 2029, then × 3.75 days a year); participation
requirements 0.72 (36 sandbox participants × 8 days = EUR 93,312 a
year from 2030, 0.64; platform onboarding of 126 firms in 2029, 0.04;
documentation for investment transactions, 0.05, not offset). PO3:
funding, designation, sandbox and platform as PO2 (3.69), PQC
requirements in public procurement as PO2 (1.23), binding PQC
duties for 180 critical operators 10.40 (plans 2.55, plan updates 4.11,
progress reports 2.38, 20% of inventory maintenance 1.36),
dependency reporting by 80 firms 0.84, origin documentation by 18
bidders 0.12 and transaction documentation 0.13, not offset. PO1
imposes no obligation.
of which within One-
In, One-Out
0.00 5.46 16.28 All of the above except documentation for investment support (PO2
0.05; PO3 0.13), an application for financial support (Tool #58, Box
4). Annualised: NPV ÷ 8.78611 = EUR 0.621 million a year (PO2)
and EUR 1.853 million a year (PO3).
Administrative
burden on public
administrations
0.45 26.06 44.93 Member States × person-days × EUR 380 a day. PO2: Quantum
Strategy Board 13.72 (position work 27 × 120 days = EUR 1,231,200
a year, 10.82; meeting preparation 56 delegates × 12 days, 2.24; sub-
groups and set-up 0.65); dependency-monitoring contributions 27 ×
60 days = EUR 615,600 a year from 2029, 4.79; national chapters
3.58 (set-up 27 × 90 days in 2028, updates every two years, alignment
sessions); international coordination 0.72; sandbox cycles 0.47; other
0.48; PQC preparedness 2.31 (national information for the biennial
assessment, 27 × 30 days every two years, 1.35; specification and
verification of PQC requirements by contracting authorities, 270
procedures × 60% × 2 days a year from 2029, 0.96). PO3 adds binding
PQC duties for 270 critical public authorities 18.30 (plans 4.48, plan
updates 7.23, progress reports 4.20, 20% of inventory maintenance
2.40), mitigation-plan follow-up 1.40 and procurement safeguards
0.12; the verification of PQC requirements by contracting authorities
(0.96) is replaced by PQC-ready procurement administration
(adjustment costs). PO1: skills focal points, 27 × 5 days a year, 0.45.
Administrative
burden on
implementing bodies
0.20 1.60 1.60 Reports by hub and Centre operators at EUR 261.60 a day: hubs, 2 ×
60 days a year from 2029 and 3 more from 2031 (0.52); Centre nodes,
8 × 40 days a year from 2029 and 7 more from 2031 (1.08). PO1: 5
labelled facilities × 20 days a year (0.20).
Business adjustment
costs
0.00 0.00 7.20 PO3 only: 80% of cryptographic-asset inventory maintenance by 180
critical operators (180 × 15 days × EUR 324 a year, 5.45), PQC-ready
procurement administration (1.09) and PM11c mitigation plans of 30
critical firms (0.66).
Adjustment costs for
public
administrations
0.00 0.00 11.50 PO3 only: 80% of inventory maintenance by 270 critical public
authorities (270 × 15 days × EUR 380 a year, 9.59) and PQC-ready
procurement administration (1.92).
59
Enforcement costs
(Commission and
Member State
authorities)
0.79 5.33 9.84 PO2: Commission 3.98 (PM5b designation, monitoring and
withdrawal, 562.5 days a year (2.5 FTE) from 2029 = EUR 325,000 a
year, 2.53; comply-or-explain enforcement 0.76; gate reviews 0.32;
verification of dependency reports 0.36); Member States 1.35
(comply-or-explain responses 27 × 10 days a year, 0.80; origin
verification 0.31; participation in coordinated PQC exercises, 27 × 6
days every two years from 2029, 0.24). PO3 replaces the PM7b and
PM11b lines (origin verification and trade-defence work 1.11;
reporting enforcement 0.45) and adds supervision of the PQC duties
(3.62). PO1: Commission monitoring (0.79).
Implementation
costs: Member State
authorities in
measures they opt
into
14.06 3.40 3.40 PO2 and PO3: buyer-group coordination, 5 Member States × 120 days
= EUR 228,000 a year from 2029 (1.78); incremental effort in 8 pre-
commercial or innovation procurements a year × 60 days (1.42); PQC
expert time (0.20). PO1, where all Member State effort is voluntary:
Board participation 6.81 (position work 27 × 60 days a year, 5.41);
mapping input 27 × 30 days a year (2.70); monitoring contributions 27
× 30 days a year (2.40); buyer group of 5 Member States (1.33);
programming exchanges 27 × 0.64 × 6 days a year (0.35); other
(0.47).
Implementation
costs: Commission
administration
18.39 25.65 29.91 Commission staff time at EUR 577.78 a day, i.e. the FTE of Table
4.14 × EUR 130,000 a year, discounted. PO2: 22.32 FTE in 2028,
26.21 in 2029 and on average 26.43 a year in 2030–2037, EUR 29.63
million in total, of which 25.65 administration and 3.98 enforcement.
Largest functions: quantum-safe preparedness 4.57 (PM13b),
dependency monitoring 4.47 (PM11b), EU chapter 3.91 (PM1b),
Quantum Strategy Board 3.35 (PM15b) and Investment Advisory
Facility 3.30 (PM10b). PO1: 16.81 FTE on average; PO3: 30.75 FTE
(adds the PM7c, PM10c, PM11c and PM13c tasks).
Implementation
costs: external
experts financed by
the Commission
0.03 0.55 0.83 Person-days × EUR 450 a day. PO2 and PO3: standardisation
requests, 2 × 80 days × 40% = 64 days a year (0.25); Grand Challenge
gate reviews, 48 days a year from 2029 (0.17); portfolio and gap
review, 30 days a year (0.11); legal-form review, 48 days in 2032
(0.02). PO3 adds financial, legal and valuation support for a European
co-investment, 2 × 40 days a year (0.28). PO1: competence-
framework mapping, 60 days in 2028 (0.03).
Implementation
costs: implementing-
body delivery
1.61 4.66 4.77 PO2 and PO3: six coordination and oversight tasks transferred from
the Commission and priced at its rate of EUR 577.78 a day (5.08):
Centre network oversight and voucher administration, 500 days a year
(2.25); excellence-network coordination and hub-network oversight,
450 days × 0.6 a year each (1.21 each); calls in 2028 (0.40). Other
tasks at EUR 261.60 a day (2.36): Joint Undertaking metadata and
briefings (1.12), laboratory participation in the excellence network, 30
× 15 days a year (0.92), sandbox cycles (0.32). At EUR 261.60 a day
the six tasks would cost EUR 2.78 million less. PO3 adds post-
investment monitoring (0.11). PO1: laboratories, signposting nodes
and Joint Undertakings (1.61).
Implementation
costs: Commission
non-staff resources
(platform build and
operation)
3.14 8.44 8.44 Cash costs of the Quantum Business Platform (PM12), from the
Union budget. PO2 and PO3: build stage 1, EUR 800,000 in 2028
(0.80); stage 2, EUR 700,000 in 2029 (0.68); stage 3, EUR 2,500,000
in 2031 (2.29); operation, EUR 600,000 a year in 2029–2037 (4.67).
PO1: build, EUR 800,000 in 2028 (0.80), and operation, EUR 300,000
a year in 2029–2037 (2.34).
Implementation
costs: incremental
Hub/Centre resources
(publicly funded
operators)
0.00 21.41 21.41 Marginal services at 5 existing hubs, EUR 0.50 million each a year in
2030–2037 (17.04), and one-off adaptation of 15 existing Centres,
EUR 0.30 million each, a third in each year 2028–2030 (4.37) (Table
4.11).
Participation by
firms without a legal
requirement (not a
compliance cost)
2.77 3.33 3.33 Firms × days × EUR 324 a day. PO2 and PO3: Alliance stakeholder
input, 200 × 2 days = EUR 129,600 a year (1.14); standards-body
experts (15 × 20 days a year), testing references and Advisory Board
time (1.29); platform input by 126 firms × 2 days a year and
matchmaking (0.73); PQC expert time (0.17). PO1: participation in
the voluntary PO1 measures (2.77).
60
Total societal cost 41.44 105.92 163.56 Sum of the lines above. Small differences are due to rounding.
Table 4.22. Calculation of the cost lines by option (EUR million NPV, 2028–2037)
18.1. PATENT EVIDENCE
The EPO analysis covers more than 31,700 published patent families with earliest
publication years between 2005 and 2024 across quantum computing and simulation,
quantum communication and quantum sensing. The revised applicant table uses unweighted
counts of international patent families with filings in IP5 jurisdictions and identifies
applicants at local-establishment level. “Europe” means the 40 EPC contracting states and
is not interchangeable with the EU27. Patent counts proxy inventive activity, protection
strategy, internationalisation and portfolio concentration; they do not measure patent quality,
commercialisation, freedom to operate or market power. Results are sensitive to the search
and classification strategy, publication lag, applicant-name consolidation, geographic
attribution and multi-applicant counting. No causal effect of the Quantum Act is inferred
from these data
18.2. OPTION AGGREGATION
Measure-level costs and modelled savings are aggregated into option-level results using the
following rules:
1. PO0 is the counterfactual and has no incremental Quantum Act cost.
2. PO1 contains 16 voluntary, advisory or enabling PM variants; one from each of
PM1–PM16, including the voluntary PM3a challenge-mapping variant.
3. PO2 contains one targeted framework variant from each of PM1–PM16.
4. PO3 contains one higher-intensity or retained PO2 variant from each of PM1–PM16;
PM15 uses a voluntary technical-coordination variant under PO1 and the same
structured implementation-support variant under PO2 and PO3.
5. Each PM family contributes only the cost items activated for the relevant option.
6. Shared governance, reporting, data and platform activities are counted once.
7. Construction and ordinary operation of existing infrastructures remain in the
baseline; the central case counts only incremental services and adaptation.
8. Programme expenditure, transfers and financing volumes are reported separately
from societal resource cost.
9. Benefits affecting the same firm, project, facility or transaction are not summed
across several PMs.
10. Physical, financial and qualitative scenarios with different units or counterfactuals
are not aggregated into a single benefit total.
18.3. AVOIDING DOUBLE COUNTING
The following rules are applied throughout the model and impact analysis:
Area Anti-double-counting rule
Administrative
information
Where the same information supports governance, Strategic Project
monitoring, business-platform functions, strategic intelligence or dependency
assessment, its provision is costed once. Existing information is reused before
a new request is created.
Governance and
programming
General governance benefits under PM1, PM15 and PM16 are not monetised
separately where they are already reflected in modelled time or coordination
savings.
61
Research,
infrastructure and
deployment
PM2–PM6 may affect the same research-to-deployment pathway. A time
saving from earlier access, testing, qualification or project coordination is
counted once.
Finance, Strategic
Projects and
procurement
PM5.2, PM7 and PM10may affect the same company or project. Financing
volumes, supplier revenue and procurement expenditure are not summed as
welfare benefits or added to the same transaction more than once.
Standards and
assurance
Reduced testing, due-diligence or qualification costs are attributed once even
where PM4, PM7 and PM8 all contribute.
Skills and user support PM6 and PM9 may support the same beneficiary. Participation and support
costs are allocated to the principal activity and are not duplicated.
Quantum-safe
preparedness
The substantive PQC migration cost arises under the baseline. PO1 adds no
PQC-specific cost beyond the baseline. Under PO2, only the incremental costs
of the preparedness assessment, the exercises, the evidence and verification
required by PQC requirements in public procurement and structured QSB–NIS
Cooperation Group cooperation are attributed to the Act, while the cost of the
PQC-capable products bought stays in the baseline; PO3 additionally includes
the incremental costs of the targeted binding roadmap-implementation duties.
Strategic intelligence
and resilience
PM11 and PM14 may draw on the same dependency information. Mapping
benefits are not added again where the same evidence supports mitigation,
procurement or international cooperation.
Simplification Common taxonomies, templates, digital procedures and once-only reuse are
incorporated in the affected PM cost and saving items. They are not counted as
a separate benefit category
Table 4.23. Anti-double-counting rules
18.4. CENTRAL OPTION-LEVEL RESULTS
The central existing-infrastructure-reuse case produces the following results. Values are
EUR million, present value over 2028–2037 in real 2024 prices.
Central result PO1 PO2 PO3
Total societal cost 41.44105.92163.56
Evidenced monetised savings 5.39 13.59 14.04
Signed monetised NPV: savings minus
cost
-36.05 -92.34 -149.52
Positive net modelled cost: cost minus
savings
36.05 92.34 149.52
Partial benefit-cost ratio 0.13 0.13 0.09
Table 4.24. Policy Options monetised costs and benefits
All partial benefit-cost ratios are below one because the model monetizes only modelled
process and transaction-cost savings with an explicit causal mechanism and deliberately
excludes most strategic and capability benefits. The monetary results therefore do not, on
their own, demonstrate positive net welfare. The preferred option is identified after
combining these results with the qualitative impact assessment, proportionality analysis,
implementation feasibility and MCDA.
Complementary analytical view PO1 PO2 PO3
Business administrative burden within
One-In, One-Out, NPV
0.00 5.46 16.28
Equivalent annual business
administrative burden
0 EUR 0.621m/year EUR 1.853m/year
Layer 2 – EU and Member State
administrative and implementation
expenditure at resource rates, EUR
million NPV
36.83 90.28 129.42
Table 4.25. Administrative-burden and budgetary views
Layer 2 is the EU and Member State administrative and implementation expenditure costed
at resource rates: EUR 90.28 million NPV for PO2, of which EUR 68.87 million for EU and
Member State tasks and EUR 21.41 million for the hub and Centre module. Implementing-
body work (EUR 9.05 million) and external experts (EUR 0.55 million) are financed from
62
the Union budget but sit outside Layer 2. Programme envelopes and transfers are not part of
Layer 2: they are reported separately and must not be added to societal cost or treated as a
welfare benefit.
18.5. SENSITIVITY ANALYSIS
Deterministic sensitivity analysis varies participation, reporting frequency, affected
populations, staff time and rates, infrastructure-service and adaptation resources, private-
finance leverage, procurement parameters, targeted information requests, data reuse and the
strength of the dynamic baseline. Low and high assumptions are plausible implementation
cases, not statistical confidence intervals.
Infrastructure-
resource case
PO1 total
cost
PO2 total
cost
PO3 total
cost
PO2 incremental
implementation
resources
Interpretation
RC-L – Low
marginal/adaptation
cost
41.44 94.49 152.12 9.98 Low marginal
service and
adaptation costs
RC0 – Central
existing-
infrastructure reuse
41.44 105.92 163.56 21.41 Central existing-
infrastructure reuse
case
RC-H – High
marginal/adaptation
cost
41.44 149.96 207.60 65.45 High marginal
service, adaptation
and specialist
support
Full-build stress 41.44 689.99 747.62 605.47 Counterfactual
construction and full-
operation case
Table 4.26. Sensitivity to infrastructure-service and adaptation assumptions, EUR million NPV
Uncertainty in the monetised results is tested through a deterministic scenario suite covering
resource intensity, consolidation economies, price-year treatment, discount rate and a
combined adverse case. Each scenario varies a defined lever and is recalculated in full. The
suite establishes the range within which the option ranking holds; it does not express results
as probabilities.
A transparent MCDA (Table 4.32) supplements, but does not replace, the reasoned
comparison in the Main Report. Criteria, scores and weights are disclosed, and the results
are used as decision support rather than as a mechanical rule.
PO2 remains first under the central weighting because it combines broad effectiveness with
targeted scope, use of existing structures and lower burden than PO3. PO3 may overtake
PO2 only where substantially greater weight is placed on its additional formal coverage in
selected strategic criteria.
18.6. IMPLEMENTATION-RESOURCE SCENARIOS
The main uncertainty concerning the infrastructure-related measures is not the construction
of new facilities, which is excluded from the central option design, but the marginal cost of
delivering additional services through existing hubs and adapting existing Centres.
The full-build stress scenario is not the central policy design. It shows the possible cost if
existing infrastructure could not be reused and construction and full facility operation had
to be attributed to the initiative.
In the full-build stress scenario, the principal incremental components are approximately
EUR 194.23 million NPV of hub capital expenditure, EUR 340.76 million of full facility
operating expenditure and EUR 131.79 million of full node operations, partly offset by an
estimated EUR 61.31 million residual-value credit (net EUR 605.47 million).
63
18.7. DETERMINISTIC SENSITIVITY ANALYSIS
Signed net NPV in EUR million; benefits minus costs:
Scenario PO1 PO2 PO3
Central existing-infrastructure case -36.05 -92.34 -149.52
Low marginal service/adaptation costs -36.05 -80.90 -138.09
High marginal service/adaptation costs -36.05 -136.38 -193.56
PO3 service intensity 1.5 times central -36.05 -92.34 -160.23
One-year implementation delay -36.05 -89.85 -147.04
Two-year implementation delay -36.05 -87.44 -144.63
20% implementation-resource overrun -36.05 -96.62 -153.80
40% implementation-resource overrun -36.05 -100.90 -158.08
Modelled benefits 20% lower -37.13 -95.05 -152.33
Modelled benefits 20% higher -34.97 -89.62 -146.71
Full-build stress -36.05 -676.40 -733.58
50% user-fee recovery -36.05 -92.34 -149.52
Stronger baseline: Assumption that 25% of
savings and of Member State effort in opt-in
measures would occur anyway
-33.88 -94.88 -152.14
Participation shares at low values (53% / 40%) -37.08 -94.01 -151.30
Participation shares at high values (75% /
75%)
-34.66 -90.62 -147.68
Member State day rate EUR 320 -34.26 -88.56 -140.45
Member State day rate EUR 440 -37.84 -96.12 -158.60
Discount rate 1.5% instead of 3% -38.36 -98.34 -159.54
Discount rate 4.5% instead of 3% -33.97 -86.92 -140.49
PM13c covered entities low (250) / high (800)
[PO3 only]
- - -127.54 / -188.03
Combined adverse case including the high
PM13c population
-41.58 -149.27 -245.86
Table 4.27. Scenario analysis
Implementation delay makes the discounted monetary result mechanically less negative
because expenditure occurs later. This should not be interpreted as a policy advantage, since
the table does not monetise, the benefits lost through delayed delivery.
Discounting at 1.5% or 4.5% instead of 3% moves all options in the same direction (PO2
net modelled cost EUR 98.34 million or EUR 86.92 million) and does not change their order.
Fee recovery has no effect on societal net present value because it transfers resources
between users and the public operator. It affects the distribution of budgetary costs only.
Across the deterministic tests, PO1 remains the least costly option and PO2 remains less
costly than PO3. In the participation cases costs barely move while savings change; in the
stronger-baseline case both savings and Member State effort in opt-in measures fall, so costs
and savings move together. The PM13c population is the single most influential assumption
for PO3. This result concerns the partial monetised assessment and does not determine the
overall preferred option.
18.8. SWITCHING VALUES
Switching values indicate the additional benefits or cost reductions that would be required
for the modelled monetised benefits to equal the modelled societal costs.
Switching-value indicator PO1 PO2 PO3
64
Additional annual benefit required for net
NPV of zero, 2029–2037
EUR 4.63m/year EUR 11.86m/year EUR 19.20m/year
Required multiplier on modelled benefits 7.69× 7.80× 11.65×
Required reduction in total modelled cost 87.0% 87.2% 91.4%
Marginal hub cost recreating full-build
stress
Not applicable EUR 17.64m per
hub/year
EUR 17.64m per
hub/year
Centre-adaptation cost recreating full-build
stress
Not applicable EUR 40.39m per
Centre
EUR 40.39m per
Centre
Effect of fee recovery on societal NPV Zero Zero Zero
Table 4.28. Switching values outcomes
The high benefit multipliers illustrate the incompleteness of the monetised benefit perimeter.
They should not be interpreted as evidence that the options could not generate benefits of
that order. Rather, they show how much non-monetised value would have to be
demonstrated for a complete welfare balance to reach zero.
18.9. STRATEGIC AND LOW-CONFIDENCE BENEFIT SCENARIOS
Some potentially material impacts could not be included in the central calculation because
their probability, scale or attribution could not be estimated with sufficient confidence.
Scenario Low Reference High Treatment and interpretation
Systemic GDP at
risk
EUR
0.40bn
EUR
1.50bn
EUR
3.00bn
Contextual stress indicator only; never
included in NPV
PO3 procurement-
premium
deadweight cost
EUR 0 EUR 0 EUR
11.04m
Low-confidence stress scenario; worsens
PO3 but does not change the ranking
Stop-rule avoided
sunk costs
Not
monetised
Not
monetised
Not
monetised
Probability of project failure at stage gates
is not sufficiently established
Financing
additionality
Not
monetised
Not
monetised
Not
monetised
Requires ex post counterfactual evaluation
Long-run R&D and
innovation
spillovers
Not
monetised
Not
monetised
Not
monetised
Causal and temporal uncertainty is too high
for the central model
Infrastructure-
service value
Not
monetised
Not
monetised
Not
monetised
Requires operator and user evidence on
additional service volumes and willingness
to pay
Table 4.29. Strategic and low-confidence scenarios excluded from the headline results
The systemic GDP-at-risk figures (EUR 0.40 / 1.50 / 3.00 billion) are contextual stress
indicators, not forecasts, and never enter the NPV. They are not and must not be considered
on the central benefits.
Uncertainty in the monetised assessment is addressed through deterministic scenarios,
workload ranges, switching values combined adverse cases and a probabilistic analysis of
the registered uncertainty ranges. The probabilistic results are reported in the following
section. They describe the dispersion of the modelled cost around the central case; they do
not alter the central estimates, which remain the reference figures throughout this Impact
Assessment.
18.10. PROBABILISTIC UNCERTAINTY ANALYSIS
The deterministic scenarios above vary one lever, or a defined bundle of levers, at a time.
They show how far the results can move, but not how likely any outcome is. A probabilistic
analysis was therefore run on the same model. Each of the 313 modelled cost and benefit
lines was drawn simultaneously from a triangular distribution defined by the low, central
and high values already registered for that line in the calculation workbook, together with
the Commission day-rate band and the marginal service and adaptation band. The discount
rate is held at 3%. Dependence between lines uses the correlation parameters registered in
65
the workbook. The run comprises 200 000 iterations and reproduces the deterministic central
case exactly when every draw is set to its central value.
Option Central case Mean P50 P80 P95
PO1 41.44 47.95 47.84 51.47 54.97
PO2 105.92 132.92 131.90 145.73 158.69
PO3 163.56 226.15 224.41 251.92 278.55
Table 4.30. Probabilistic distribution of total societal cost on the registered uncertainty ranges, EUR million
NPV, 200 000 iterations
The dispersion in Table 4.30 - between P50 (50th percentile), P80 (80th percentile) and P95
(95th percentile) - should not be read as evidence that the central estimates are too low. It
reflects the shape of the ranges recorded in the model. For 95% of the modelled lines the
registered high value lies further above the central value than the low value lies below it,
and the asymmetry is systematically wider where the evidence is weaker: the ratio of upside
to downside is 1.0 for lines rated High, 1.9 for Medium and 2.6 for Low. Part of the
difference between the central case and the median outcome is therefore a property of how
uncertainty was recorded under weak evidence, rather than a measurement of expected cost.
The probabilistic results are reported as evidence on dispersion and on evidence priorities.
They do not replace the central estimates, and they inherit the limitations of the ranges they
sample.
18.11. MULTI-CRITERIA DECISION ANALYSIS (MCDA)
A multi-criteria decision analysis was used as a structured transparency and decision-support
tool. It supplements, but does not replace, the reasoned comparison of the policy options. Its
purpose is to bring together the partial monetised assessment and material qualitative effects
that cannot be expressed reliably in monetary terms.
The retained options were assessed against eight criteria: effectiveness; efficiency;
coherence; proportionality; feasibility and implementation risk; competitiveness and SME
effects; resilience and economic security; and social, skills and cohesion effects. Scores use
an ordinal scale from 1 to 5, where a higher score represents more favourable performance.
Intermediate scores distinguish comparatively close judgements but do not imply statistical
precision.
The balanced reference case assigns an equal weight of 12.5% to each criterion. Equal
weighting is used as a transparent reference because there is no empirical basis for assigning
more precise central weights. The weighted score for each option is calculated as the sum of
its criterion scores multiplied by the corresponding weights. Criteria, scores and weights
remain policy judgements rather than statistically estimated parameters.
66
18.11.1. Criteria, definitions, central weights and principal evidence
The criteria, definitions, central weights and principal evidence sources are set out in table
below:
Criterion Definition and scoring
direction
Central weight Principal evidence
Effectiveness Credible coverage and delivery
of SO-A–SO-G, excluding
downstream impacts scored
separately. Higher means
stronger delivery.
12.5% Intervention logic, Table
8.13 and Impact Register
Efficiency Evidenced benefits relative to
incremental societal resource
cost. Higher means a more
favourable cost-effectiveness
position.
12.5% Table 4.19 and Table 4.24
and sensitivity analysis
Coherence Complementarity with existing
Union instruments and
avoidance of duplication or
conflict.
12.5% Baseline and coherence
analysis
Proportionality Targeting and legal or
administrative intrusiveness
relative to the problem
addressed. Higher means more
proportionate.
12.5% Legal analysis and
administrative-burden
assessment
Feasibility and
implementation
risk
Deliverability within the
available institutional capacity,
resources and timetable.
12.5% Commission, Member-State
and delivery-body resource
analysis
Competitiveness
and SME effects
Expected effects on industrial
capability, market access and
SMEs, net of direct burdens.
12.5% Competitiveness Check,
SME analysis and OIOO
results
Resilience and
economic security
Expected contribution to supply-
chain, technological and
quantum-safe resilience.
12.5% Impact Register and
dependency/PQC analysis
Social, skills and
cohesion
Expected skills, employment,
distributional and territorial
effects.
12.5% Skills and distributional-
impact analysis
Table 4.31. MCDA criteria, definitions and weights
The aggregation formula is:
= ∑
8
=1
where is the score of option on criterion k, and the weights sum to one.
18.11.2. Double-counting controls
Double counting is controlled by distinguishing the role of each criterion. Effectiveness
concerns the credible coverage and delivery of the policy objectives. Efficiency uses the
societal-cost and modelled-benefit perimeter of the cost-benefit analysis and does not use
total public-budget outflow. Proportionality concerns the targeting and intrusiveness of the
intervention, while feasibility concerns administrative and institutional deliverability.
Competitiveness, resilience and social effects cover impact-specific consequences not
already counted in the effectiveness score.
Criterion Weight PO0 PO1 PO2 PO3
Effectiveness 12.5% 1.00 2.75 3.75 4.25
67
Efficiency 12.5% 3.00 3.75 2.50 1.25
Coherence 12.5% 2.00 3.00 4.00 4.00
Proportionality 12.5% 4.00 4.00 3.50 2.25
Feasibility and implementation risk 12.5% 4.00 4.00 3.00 2.00
Competitiveness and SME effects 12.5% 1.50 2.50 3.50 3.75
Resilience and economic security 12.5% 1.00 2.00 3.75 4.50
Social, skills and cohesion 12.5% 1.50 2.00 3.50 3.50
Weighted score 100% 2.250 3.000 3.438 3.188
Rank among retained options
— 3 1 2
Table 4.32. MCDA central score matrix
PO0 is included as a baseline reference but is not a retained option.
18.11.3. Rationale for the scores
Effectiveness: PO1 relies predominantly on voluntary coordination. PO2 introduces
structured EU-wide planning, support and implementation mechanisms. PO3 adds targeted
binding preparedness, assurance, dependency-reporting and procurement requirements.
Efficiency: PO1 has the lowest partial monetised net cost. PO2 costs more but provides
wider coverage. PO3 has the highest cost and burden within the quantified perimeter.
Coherence: PO2 and PO3 use comparable coordination interfaces with existing Union
legislation and programmes; PO3’s additional binding layer does not itself increase
coherence.
Proportionality: PO1 is least intrusive. PO2 remains targeted and mainly uses existing
structures. PO3 adds binding requirements.
Feasibility: PO3 requires a larger supervisory and compliance-review function than PO2.
PO1 is easiest to administer but delivers fewer policy mechanisms.
Competitiveness and SME effects: PO2 improves access, coordination and scale-up
support with lower direct burden than PO3. PO3 provides stronger formal coverage but
introduces materially higher business-facing obligations.
Resilience and economic security: PO3 scores highest because it adds binding
preparedness and reporting requirements. PO2 provides structured implementation support
without the same mandatory coverage.
Social, skills and cohesion: PO2 and PO3 retain the same principal skills architecture. No
sufficiently direct additional PO3 effect has been demonstrated, so they receive the same
score.
Under the balanced central weighting case, PO2 obtains the highest weighted score. It
provides materially stronger and more structured delivery than PO1 while avoiding part of
the legal intensity, administrative burden and implementation risk associated with PO3. PO3
scores higher on effectiveness and resilience but lower on efficiency, proportionality and
feasibility.
18.11.4. Robustness of the MCDA results
Because both scores and weights can be considered judgemental, and the ranking is weight
dependent, the stability of the result was tested under alternative weighting assumptions and
criterion-exclusion tests.
Test PO1 PO2 PO3 Result
68
Balanced:
12.5% each
3 3.438 3.188 PO2 first
Efficiency-heavy:
efficiency 30%, others 10%
3.15 3.25 2.8 PO2 first
Security-heavy:
resilience 30%, others 10%
2.8 3.5 3.45 PO2 and PO3 very
close
Competitiveness criterion excluded 3.071 3.429 3.107 PO2 first
Efficiency criterion excluded 2.893 3.571 3.464 PO2 first
Table 4.33. MCDA Robustness test results
Under all tested scenarios, PO2 remains ahead of the alternative options. But on the security-
heavy case, PO2 is narrowly first, in this test PO3 would overtake PO2 only if the resilience
and economic-security criterion received a weight above approximately 34.4%, with other
weights adjusted proportionally. This threshold does not provide a probability or empirical
estimation, but shows how much more relevant than the other weights, security criterion
would have to be in order to change the results. In that case, all other criteria would need to
have a weight below 9.38%, while security would have to dominate the results with a weight
of 34.4%.
18.11.5. MCDA-specific limitations
The MCDA alone does not demonstrate that a policy option has a positive monetised net
benefit and does not mechanically determine the preferred option. It makes explicit the
policy judgements needed to combine monetised costs, qualitative impacts, proportionality
and implementation considerations. The preferred option therefore continues to rest on the
reasoned assessment of the evidence as a whole.
18.12. LIMITATIONS
The analysis is subject to substantial technological, market, implementation and data
uncertainty. Quantum technologies differ in maturity, capital intensity, supply chains and
applications, and the timing and scale of breakthroughs cannot be forecast reliably.
Company, investment and procurement databases are not exhaustive. Infrastructure
mappings do not always reveal actual utilisation, available capacity, waiting times or
contractual barriers. Supplier mapping is selective and constrained by confidentiality and
limited visibility beyond direct suppliers.
The model deliberately monetises only incremental resources and modelled time or
transaction-cost savings. It does not monetise most expected effects on industrial capability,
innovation spillovers, firm growth, infrastructure-service value, strategic resilience,
cybersecurity preparedness, employment or long-term productivity. A negative signed
monetised NPV therefore does not imply that an option has no strategic or societal value; it
means that the quantified savings are lower than the modelled costs within the deliberately
partial monetary perimeter.
The central case assumes reuse of existing infrastructure and includes illustrative marginal
service and adaptation resources. The full-build case is a stress test and should not be
presented as the expected cost of the preferred option. Programme-resource scenarios
depend on future budgetary decisions and are not fixed by the Regulation.
The assessment mitigates these limitations by triangulating evidence, distinguishing
observations from assumptions, avoiding unsupported forecasts, presenting low/central/high
probabilistic and deterministic sensitivity results, applying conservative anti-double-
counting rules, separating societal, budgetary and financing views, and defining monitoring
indicators that will permit ex-post validation.
1. The model does not value the service received by users of hubs and Centres. These
costs are therefore included without an offsetting service-value benefit.
69
2. Take-up affected populations and staff-time assumptions are necessarily uncertain
because the initiative has not yet been implemented.
3. The model cannot reliably monetise long-term innovation, resilience, strategic-
autonomy, skills, cohesion or productivity effects.
4. The PO2 programme-resource envelope depends on future Multiannual Financial
Framework, programme-legislation and national-budget decisions.
5. The model assumes that existing laboratories and Centres can be reused. The full-
build scenario shows that the results would be materially different if substantial new
construction became necessary.
6. The policy measures, projects, technologies and portfolio allocations will evolve.
The model is therefore an appraisal tool and not a predetermined implementation
plan.
The model should be updated during implementation using observed participation, time
requirements, utilisation rates, administrative burdens, project performance, service
volumes and unit costs. Monitoring should distinguish SMEs from larger businesses, host
from non-host Member States and different categories of infrastructure users.
19. PART D – INDICATIVE PROGRAMME-RESOURCE ENVELOPE FOR PO2, 2028-
2034
19.0. PURPOSE, SCOPE AND ANALYTICAL BOUNDARY
The administrative, adjustment and implementation costs estimated elsewhere in this Annex
concern the operation of the regulatory, governance and delivery framework established by
the initiative. They do not represent the substantive programme resources that could be
required to finance Quantum Grand Challenges, Strategic Projects, infrastructures, shared-
access measures, innovation procurement, skills, standards, dependency mitigation or other
programme actions.
This section therefore presents a separate bottom-up estimate of the programme resources
that could support implementation of Policy Option 2 over the period 2028–2034. The
estimate is intended to illustrate the order of magnitude and composition of the resources
that could be required to implement the preferred option with sufficient scale and continuity.
The estimate is not a financing proposal, a forecast of future appropriations or a list of pre-
selected projects. It does not create an automatic funding entitlement for any project, facility,
company or Member State. Actual resources would remain subject to the future Multiannual
Financial Framework, programme legislation, annual Union budgetary procedures, national
and regional budgetary decisions, applicable State-aid and procurement rules and individual
project-selection and investment decisions.
The following analytical conventions apply:
• the amounts are indicative, non-discounted planning amounts for 2028–2034; no
separate inflation uplift is applied;
• the estimate covers new or incremental action under the preferred option. Activities
already financed under the dynamic baseline are excluded unless the estimate
concerns an identifiable expansion, upgrade or additional cross-border service;
• Union, Member State and industry contributions are estimated separately at measure
level. The resulting portfolio-level distribution does not imply a uniform co-
financing rate for every action;
• Member State contributions may comprise national and regional resources and other
public co-financing attributable to participating Member States;
70
• industry contributions represent direct project-level co-investment, in-kind
contributions where eligible and verifiable, co-funded reference deployments and
private-user participation;
• additional private capital mobilised through equity, loans, guarantees, syndication or
the Quantum Investment Service Desk is excluded from the central envelope and
would be reported separately;
• procurement expenditure is not treated as a benefit, and supplier revenues from
procurement contracts are not treated as supplier co-financing;
• programme expenditure is not added mechanically to the administrative, adjustment
or societal-cost estimates generated through the Standard Cost Model; and
• the estimate is associated with the delivery of PO2 but does not alter the legal content
of the option or determine the option ranking.
19.1. BOTTOM-UP CALIBRATION AND FINANCING STRUCTURE
The estimate is built bottom-up from the portfolio of actions. It reflects updated assumptions
concerning scientific excellence, Technology and Innovation Hubs, competence clusters,
Grand Challenges, ecosystem R&I, quantum-computing platforms and systems, testing
facilities, Strategic Projects, skills and horizontal ecosystem-support measures.
Deployment and first-buyer expenditure is embedded in the relevant computing-system and
Strategic Project lines. It is therefore not presented as a separate additional procurement
envelope. Similarly, support for dependencies, standards, benchmarking, PQC
implementation, strategic intelligence and studies may be financed through the relevant
ecosystem R&I and horizontal-support lines and should not be added again as separate
budget categories.
High-level area Union contribution Total resources
Scientific excellence, R&I and technology
maturation
EUR 1.0575–1.4575bn EUR 2.665–3.865bn
Quantum infrastructures and testing EUR 1.90–2.25bn EUR 4.60–5.30bn
Pilot infrastructures, Strategic Projects and first
deployments
EUR 1.90–2.00bn EUR 5.20–8.40bn
Skills and horizontal/ecosystem measures EUR 0.33–0.41bn EUR 0.43–0.51bn
Total EUR 5.1875–
6.1175bn
EUR 12.895–
18.075bn
Table 4.34 Summary of indicative PO2 programme-resource planning ranges, 2028–2034. Source:
Commission-services bottom-up estimate. Member State and industry amounts are derived from the
indicative co-financing assumptions applied to each action and do not constitute confirmed commitments.
19.2. INDICATIVE ALLOCATION FOR PO2
The allocation below translates the principal measures included in PO2 into an indicative
programme-resource structure. It combines measures implemented primarily through Union
programmes, measures expected to involve Member State co-financing and actions in which
direct industry participation could reasonably be expected.
The bottom-up planning exercise identifies an indicative Union programme contribution of
EUR 5.19–6.12 billion for PO2 over 2028–2034. Applying the action-specific resource
assumptions underlying the portfolio gives an indicative total direct programme volume of
approximately EUR 12.90–18.08 billion, including Union resources and expected Member
State and industry participation where relevant. These ranges reflect alternative scales of
implementation rather than statistical confidence intervals. They do not imply a uniform co-
financing rate or a legal commitment by Member States or industry.
Area/action Union
contribution
Total
resources
Planning basis
71
Scientific excellence, R&I and technology maturation
Quantum S&T Excellence
Network
EUR 87.5m EUR 175m Distributed research-excellence
cooperation
Technology and Innovation
Hubs
EUR 185m EUR 370m Specialised engineering, testing and
maturation capabilities
Competence and Acceleration
Centres
EUR 235m EUR 470m Distributed user access, acceleration
and referral
Quantum Grand Challenges EUR 400–
700m
EUR 1.2–
2.1bn
Scalable according to number and
ambition of Challenges
Other ecosystem R&I EUR 150–
250m
EUR 450–
750m
Additional maturation and enabling-
technology actions
R&I subtotal EUR 1.0575–
1.4575bn
EUR 2.665–
3.865bn
Quantum infrastructures and testing
20–27 quantum machines
integrated with AI Factories
EUR 1.0–
1.35bn
EUR 2.0–
2.7bn
Number of systems scalable to
available resources
Further development of 6
quantum-computing
platforms and 2 simulators
EUR 800m EUR 2.4bn Development of existing/prototype
European platforms
Testing and experimentation EUR 100m EUR 200m System-level and non-chip-specific
capabilities
Infrastructure subtotal EUR 1.90–
2.25bn
EUR 4.60–
5.30bn
Strategic Projects and first deployments
EuroQCI EUR 800m EUR 1.6bn Incremental activity; avoid baseline
double counting
Quantum Internet EUR 200m EUR 400m Development/deployment
Quantum gravimetry/PNT EUR 200m EUR 400m Strategic sensing and navigation
capability
Quantum-enhanced MRI EUR 200m EUR 400m Deployment and scale-up of
validated capability
Quantum software EUR 200m EUR 600m Software stacks, middleware,
algorithms and applications
Other Strategic Projects EUR 300–
400m
EUR 1.8–
5.0bn
Scalable portfolio; €4bn may be used
as central internal planning case
Pilot infrastructures and
Strategic Projects subtotal
EUR 1.90–
2.00bn
EUR 5.20–
8.40bn
Skills and horizontal/ecosystem measures
Skills and mobility EUR 100m EUR 200m Industrial, technical, deployment and
user-side skills
International cooperation EUR 150–
200m
EUR 150–
200m
Strategic partnerships and joint
activities
Quantum Business Platform EUR 30m EUR 30m Development and operation
CSAs, studies and programme
support
EUR 50–80m EUR 50–
80m
Governance, intelligence,
coordination and studies
Horizontal subtotal EUR 330–
410m
EUR 430–
510m
TOTAL QUANTUM ACT
PROGRAMME
RESOURCES
EUR 5.1875–
6.1175bn
EUR
12.895–
18.075bn
Excludes broader sector financing
needs and Chips JU activities.
Table 4.35. Bottom-up programme suggested budget -
72
Source: Commission-services bottom-up estimate. The figures indicate possible portfolio composition and do
not earmark funds, predetermine project selection or establish a legal obligation on Member States or
industry to provide the amounts shown5.
The number, scale and technological orientation of the individual actions would be
determined through roadmaps, competitive selection, maturity and demand assessments and
portfolio reviews. In particular:
• the legislation would not predetermine the number or location of competence and
user-support nodes;
• the assumptions of up to eight Technology and Innovation Hubs and seven Grand
Challenges, comprising one FTQC Grand Challenge and six additional Grand
Challenges, are programme-planning assumptions rather than statutory
requirements;
• additional infrastructure would be financed only where capability mapping, access
data or demand evidence demonstrate a missing capability or persistent capacity
constraint;
• support for EuroQCI concerns incremental activity over 2028–2034 and do not
duplicate activities already financed under the dynamic baseline;
• the testing and experimentation amount covers system-level and non-chip-specific
facilities and does not include quantum-chip or semiconductor pilot-line
expenditure;
• any PQC implementation support included within the “Other measures” line
concerns technical advice, common tools, testing and implementation coordination
attributable to the Quantum Act, not the economy-wide cost of replacing
cryptographic assets or complying with existing cybersecurity obligations; and
• the broader sector financing-needs estimate is not included in the programme-
resource total and is reported separately below.
19.3. DIRECT INDUSTRY PARTICIPATION AND ADDITIONAL PRIVATE
MOBILISATION
The total-resource ranges include action-specific Member State and industry participation
where this forms part of the underlying delivery assumption. They should not be interpreted
as implying a uniform co-financing rate or confirmed commitments. Direct project-level
industry participation is analytically distinct from additional private capital mobilised
through financial instruments. The latter is therefore reported separately and is not included
in the EUR 12.90–18.08 billion direct programme-resource range.
Direct industry contributions to other actions may arise during implementation but are not
included in the central estimate unless a specific co-financing assumption has been
identified. Additional private capital mobilised through equity, debt, guarantees or the
Quantum Investment Service Desk is reported separately.
19.4. INDICATIVE SECTOR FINANCING NEEDS
Financing need Indicative amount
20–40 start-ups, up to EUR 100m each EUR up to 4bn
5 Figures reflect rounded programme-planning assumptions. Consequently, some formula components may
not sum exactly before rounding. The quantum-computing platform, system-acquisition and testing lines cover
full systems and non-chip-specific capabilities. Quantum-chip design, fabrication, pilot-line, prototyping,
testing and validation expenditure is excluded and remains under the Chips Act and the Chips Joint
Undertaking. The number and location of actions are indicative programme assumptions, not requirements
established by the Regulation.
73
Up to 50 scale-ups, Series B/C, EUR 400–500m each EUR 20–25bn
Large strategic projects and foundries EUR 25–30bn
Total indicative sector financing need Around EUR 50–60bn
Table 4.36. Financing need per size of player
These figures represent indicative sector financing needs, mainly equity, rather than
programme expenditure or a funding commitment. They could be addressed through a
combination of private investment and instruments such as the EIC, InvestEU, STEF and
others. They are separate from the EUR 5.19–6.12 billion Union programme-resource range.
Related Chips JU quantum activities EU contribution Total resources
Up to six quantum pilot lines EUR 300–400m EUR 900m–1.2bn
Design tools EUR 50m EUR 100m
Enabling technologies EUR 100m EUR 200m
CSAs/community/studies EUR 30m EUR 30m
Subtotal excluding foundries EUR 480–580m EUR 1.23–1.53bn
Quantum foundries TBD TBD
Table 4.37. JU activities expected budget
These activities are presented for completeness and to clarify the boundary between the
Quantum Act planning exercise and the Chips JU. They are not included in the Quantum
Act programme-resource totals above. Future quantum-foundry investment remains to be
determined, and any use of Union financial instruments should be checked for overlap with
the broader sector financing-needs estimate.
19.5. RELATIONSHIP WITH THE POLICY OPTIONS
The programme-resource estimate is presented for PO2 because it is the preferred option
and contains the delivery architecture required to coordinate the portfolio, including
common programming, Grand Challenges, Strategic Projects, infrastructure access,
procurement pathways, finance support and monitoring.
PO1 would rely principally on voluntary cooperation and improved use of existing
instruments. No separate programme-resource envelope is estimated for PO1, although
ordinary programme expenditure could continue under the dynamic baseline.
PO3 would retain the PO2 delivery architecture but could require additional resources for a
dedicated investment mandate or capacity within existing or future financial instruments and
higher-intensity strategic procurement. No separate PO3 envelope is quantified because its
scale would depend on the final design of those instruments and future budgetary decisions.
The absence of a separate PO3 envelope does not imply that its programme-resource
requirements would be identical to those of PO2.
The programme-resource estimate does not determine the option ranking. The comparison
of PO1, PO2 and PO3 remains based on their effectiveness, efficiency, coherence,
proportionality, rights implications and implementation feasibility.
19.6. GOVERNANCE, SELECTION AND REALLOCATION SAFEGUARDS
A portfolio of this scale should be managed as a staged investment programme rather than
as a fixed list of projects. The following safeguards would apply:
• publication and periodic updating of technology, infrastructure, demand and
dependency roadmaps;
• open, competitive and transparent selection, except where security or duly justified
strategic considerations require a restricted procedure consistent with applicable law;
• independent technical, financial and market assessment before major commitments;
74
• milestones and stage gates for Grand Challenges and Strategic Projects, with later
tranches conditional on satisfactory progress;
• additionality tests to establish whether the action would proceed at the same scale
and timing without public support;
• technology-neutral selection criteria, except where a roadmap or use case objectively
requires a defined capability;
• cross-border participation and European-spillover requirements proportionate to the
type of action;
• common and transparent access conditions for publicly supported infrastructures;
• SME and start-up participation measures, including simplified procedures, technical
assistance and proportionate reporting;
• monitoring of beneficiary, Member State and industry co-financing;
• portfolio reviews allowing resources to be redirected from underperforming actions,
obsolete priorities or facilities with insufficient utilisation;
• monitoring of environmental performance, security, skills, geographic participation
and supply-chain effects;
• assessment of whether investments duplicate existing facilities, displace national
expenditure already included in the baseline or crowd out viable private financing;
and
• explicit controls preventing the same expenditure, output or private investment from
being reported under more than one programme category.
Subject to applicable programme and budgetary rules, up to 10% of the portfolio could be
reallocated between action categories following a major portfolio review without increasing
the total Union envelope.
19.7. MONITORING
Delivery of the programme envelope should be monitored through the framework
established in Annex 10. Relevant indicators would include:
• Union resources committed and paid by measure and action category;
• Member State commitments and payments;
• direct beneficiary and industry co-financing;
• additional private capital mobilised through financial instruments, reported
separately;
• number and value of Strategic Projects and Grand Challenges selected;
• technical, industrial and deployment milestones achieved;
• projects continued, redirected or discontinued following stage-gate reviews;
• new or upgraded production, testing and infrastructure capacity;
• infrastructure utilisation, waiting times and number of cross-border users;
• SME and start-up participation;
• number and value of PCP, PPI and reference-deployment actions;
• number and diversity of participating public and private buyers;
• prototypes validated and operational deployments achieved;
75
• follow-on purchases, customer contracts or private investment following reference
deployments;
• progress in qualifying alternative suppliers and mitigating identified dependencies;
• people trained, mobility actions and industrial placements completed; and
• contributions to standards, benchmarks, testing methods and assurance
arrangements.
Commitments, payments, financial-instrument volumes, direct industry co-financing,
additional private mobilisation and physical outputs should be reported separately. They
should not be aggregated into a single headline figure without explaining the different
financial and economic nature of each category.
19.8. TREATMENT IN THE COST-BENEFIT AND BUDGET ANALYSIS
The bottom-up planning exercise identifies an indicative Union programme contribution of
EUR 5.19–6.12 billion and total direct programme resources of EUR 12.90–18.08 billion
over 2028–2034, including action-specific Member State and industry participation where
relevant. These ranges are presented as a separate programme-resource view and do not
replace or alter the administrative, adjustment, public-budget or societal-cost totals produced
by the Standard Cost Model. Separately, broader sector financing needs are estimated at
around EUR 50–60 billion, mainly equity, comprising approximately EUR 2–4 billion for
20–40 start-ups, EUR 20–25 billion for up to 50 scale-ups, and EUR 25–30 billion for large
strategic projects and foundries. These are ceilings on a financing need, not committed or
mobilised finance. These needs could be addressed through private investment and
instruments such as the EIC, InvestEU, STEF and others. They are reported separately and
are not added to the programme-resource total.
The following treatment applies:
• grants, vouchers and similar support are recorded in the public-budget view as
transfers and are not automatically treated as societal costs;
• procurement expenditure is a budgetary amount and an activity indicator, not a
benefit. Any procurement price premium or incremental resource cost should be
assessed separately where evidence permits;
• equity, loans and guarantees are financial instruments. Their face value, public risk-
bearing amount and private investment mobilised should be reported separately;
• infrastructure investment should distinguish expenditure, real resource use, existing
assets reused and any transfer component;
• Member State and direct industry participation is included in the total programme-
resource range only where it represents a separately identifiable contribution to the
supported activity;
• supplier revenue from a public procurement contract is not simultaneously counted
as private co-investment;
• follow-on private investment should not be added where it is already included within
the financing volumes attributed to the Quantum Investment Service Desk; and
• the EUR 12.90–18.08 billion total direct programme-resource range must not be
added mechanically to the PO2 societal-cost estimate or to the financing and
investment activity indicators produced by the Standard Cost Model.
76
19.9. UNCERTAINTY AND LIMITATIONS
The programme-resource planning range is subject to substantial uncertainty. The final cost
of actions will depend on technological progress, project scale, location, infrastructure
requirements, procurement design, participation by Member States and industry, applicable
aid intensities and the outcome of the future Multiannual Financial Framework.
The estimated Member State and industry contributions are leverage assumptions rather than
confirmed commitments. They should be validated through consultation with the relevant
programme authorities, implementing bodies, Member States, infrastructure operators and
industry before final budgetary decisions.
The estimate does not quantify:
• a dedicated capital envelope for the Quantum Investment Service Desk;
• all private capital that could be mobilised through financial instruments;
• wider company investment triggered by improved market expectations;
• follow-on commercial investment after successful procurement or reference
deployment;
• expenditure financed entirely under the dynamic baseline; or
• economy-wide PQC migration and replacement costs attributable to existing
cybersecurity frameworks.
The estimates should therefore be interpreted as a transparent bottom-up planning reference
for PO2, not as a forecast of actual expenditure or total investment generated by the
initiative.
77
ANNEX 5: COMPETITIVENESS CHECK
20. OVERVIEW OF IMPACTS ON COMPETITIVENESS
Dimensions of
Competitiveness
Impact of the initiative (++ / +
/ 0 / - / -- / n.a.)
References to sub-sections of the main
report or annexes
Cost and price
competitiveness +
Main Report, Section 6.3; Annex 3;
Annex 4; Annex 8
International
competitiveness ++
Main Report, Sections 2.1 and 6.3;
Annex 8
Capacity to innovate ++ Main Report, Section 6.3; Annex 8
SME competitiveness + Main Report, Section 6.3; Annex 6
Table 5.1. Overview of impacts on competitiveness
21. SYNTHETIC ASSESSMENT
PO2 is expected to have an overall positive impact on the competitiveness of the EU
quantum sector, mainly by improving the transition from research and start-up creation to
industrial validation, scale-up and deployment. This responds to a clear competitiveness gap
(for more details, see Section 2 of the Impact Assessment and Annex 6: SME check). Cost
and price competitiveness is assessed as moderately positive, with EUR 8.83 million NPV
in business costs compared with EUR 6.45 million in modelled savings, excluding wider
benefits not captured by the model. International competitiveness and innovation capacity
are assessed as strongly positive, while SME competitiveness is moderately positive,
provided that administrative burdens and access barriers are effectively mitigated.
22. COMPETITIVE POSITION OF THE MOST AFFECTED SECTORS
The initiative primarily affects the emerging European quantum-technology ecosystem and
its specialised enabling supply chains, including quantum computing and simulation,
quantum communication, quantum sensing and metrology, software, components and
related enabling technologies.
Available company mapping identifies 141 EU-based quantum companies in a global
sample of 441 companies. The European ecosystem is characterised by a large number of
young and relatively small firms: around 60% of mapped EU quantum firms were
established after 2018, and only around 7.6% of firms for which employment data are
available have more than 100 employees.
At the same time, the evidence points to weaker progression towards later-stage financing
and industrial scale. Mapped EU quantum firms attracted approximately EUR 862 million
in venture-capital investment between 2012 and 2024, compared with approximately EUR
2.9 billion for US firms. The EU therefore combines a strong scientific and entrepreneurial
base with a comparatively weaker capacity to finance and scale companies through later
stages of industrial development.
The preferred option is expected to strengthen the competitive position of the affected
sectors by improving access to shared infrastructure, scale-up finance, first buyers, testing
and standards, skills and cross-border industrial cooperation. The magnitude of these effects
remains uncertain and will depend on technological maturity, market uptake and the
implementation of accompanying Union and Member State programmes.
78
ANNEX 6: SME CHECK
23. OVERVIEW OF IMPACTS ON SMES
The initiative is considered highly relevant for SMEs. European quantum companies are
predominantly young and relatively small. SMEs and start-ups are therefore central to the
expected benefits and may also be disproportionately affected by fixed application,
reporting, testing, qualification and procurement costs.
SME Check Assessment
(1) IDENTIFICATION OF AFFECTED BUSINESSES AND ASSESSMENT OF RELEVANCE
Are SMEs directly affected?
(Yes/No) In which sectors?
Yes. SMEs are directly affected in quantum hardware, software and
applications, components and enabling technologies,
cybersecurity/PQC, specialised engineering, testing and related
technical services.
Estimated number of directly
affected SMEs
A robust EU-wide estimate by SME size is not available because
quantum technologies do not correspond to a single statistical business
category and SME status is incomplete in the available datasets. The
mapping identifies 141 EU-based quantum companies out of 441
mapped globally and indicates that the ecosystem is predominantly
composed of young and relatively small firms.
Estimated number of
employees in directly affected
SMEs
A robust EU-wide estimate is not available because employment
coverage and SME status are incomplete across the available company
datasets.
Are SMEs indirectly affected?
(Yes/No) In which sectors?
What is the estimated number
of indirectly affected SMEs and
employees?
Yes. SMEs may be indirectly affected as suppliers, subcontractors,
consortium partners, infrastructure users and adopters of quantum
technologies. A reliable EU-wide estimate of indirectly affected SMEs
and employees is not available.
(2) CONSULTATION OF SME STAKEHOLDERS
How has the input from the
SME community been taken
into consideration?
SMEs participated in the Call for Evidence, targeted interviews and
industry survey. Of 41 industry-survey respondents, 33 were micro,
small or medium-sized organisations: 12 micro, 14 small and 7
medium-sized. Their input informed the design of measures on
infrastructure access, finance, procurement, standards, reporting and
simplification.
Are SMEs’ views different
from those of large businesses?
(Yes/No)
Yes, to some extent. SMEs placed greater emphasis on affordable
infrastructure access, later-stage finance, first customers, simplified
procedures and the disproportionate impact of fixed testing,
qualification and reporting costs. The number of large-company
respondents was too small for a robust quantitative comparison.
(3) ASSESSMENT OF IMPACTS ON SMEs
What are the estimated direct
costs for SMEs of the preferred
policy option? – Qualitative
assessment
Costs may arise from applications, project monitoring, testing and
qualification, procurement participation and narrowly targeted
information requests. Most business participation remains voluntary.
Quantitative assessment The model does not permit a robust allocation of costs by company
size. For businesses/private actors as a whole, PO2 entails EUR 8.83
million NPV, including EUR 5.50 million NPV of administrative costs
(EUR 5.46 million within One-In, One-Out). These figures should not
be interpreted as SME-specific costs.
What are the estimated direct
benefits/cost savings for SMEs
of the preferred policy option?
– Qualitative assessment
SMEs are expected to benefit from improved access to specialised
infrastructure, finance and investors, procurement and reference
customers, testing and standards support, skills and user-support
services.
Quantitative assessment Modelled savings for businesses and private actors as a whole amount
to EUR 6.45 million NPV under PO2. The available data do not allow
these savings to be allocated reliably between SMEs and larger
businesses.
What are the indirect impacts
of this initiative on SMEs?
Expected positive impacts include stronger supply chains, improved
market opportunities, greater investor and customer confidence and
79
better access to cross-border ecosystems. Potential negative impacts
include concentration of support, incumbent advantage, skills shortages
and fixed testing, qualification and reporting costs.
(4) MINIMISING NEGATIVE IMPACTS ON SMEs
Are SMEs disproportionately
affected compared to large
companies? (Yes/No) If yes, are
there any specific subgroups of
SMEs more exposed than
others?
Potentially yes. Fixed application, reporting, testing and qualification
costs can represent a higher relative burden for micro and small
enterprises, in particular firms with limited administrative capacity.
Have mitigating measures been
included in the preferred
option/proposal? (Yes/No)
Yes. Measures include simplified and staged applications, common
templates, digital processes, once-only information reuse,
proportionate requirements, technical assistance, shared testing and
vouchers, staged procurement and cross-border infrastructure access.
Targeted information requests are limited by necessity and
proportionality.
CONTRIBUTION TO THE 35% BURDEN REDUCTION TARGET FOR SMEs
Are there any administrative
cost savings relevant for the
35% burden reduction target
for SMEs?
No quantified contribution is claimed. Although the model identifies
EUR 6.45 million NPV of business-side savings, these cannot currently
be allocated reliably to SMEs and do not necessarily constitute
qualifying administrative OUTs. Annex 3 therefore reports EUR 0 of
qualifying administrative OUTs.
Table 6.1. Impacts on SMEs
The classification as highly relevant should be reflected in the Inter-Service Group
conclusions, the executive summary, the Main Report and the monitoring framework.
ADDITIONALINFORMATION
24. IDENTIFICATION OF AFFECTED SMES
24.0. SME POPULATION AND CHARACTERISTICS
The quantum sector does not correspond to a single statistical business category. Quantum
firms operate across research and development, specialized electronics, photonics,
semiconductors, software, cybersecurity, telecommunications, sensing, aerospace and
professional services. Standard structural-business datasets therefore do not provide a
complete count of quantum SMEs by size. The available mappings nevertheless indicate
that the EU has a comparatively large and young entrepreneurial base:
• 141 of 441 mapped global quantum companies were EU-based;
• approximately 60% of the mapped EU firms were established after 2018;
• only approximately 7.6% of EU firms with available employment data exceeded 100
employees;
• EU firms participated in 18 of 95 identified financing rounds above EUR 25 million;
and
• EU quantum firms raised approximately EUR 862 million in venture capital between
2012 and 2024, compared with EUR 2.9 billion raised by US firms.
These figures use different datasets and should not be combined arithmetically. Taken
together, they indicate that most EU quantum companies are at start-up or early growth stage
and that comparatively few have reached substantial industrial scale.
24.1. PRINCIPAL SME GROUPS AFFECTED
SME group Typical role Principal policy measures
80
Quantum
hardware
developers
Computing,
communication or sensing
systems and subsystems
PM2 Quantum S&T Excellence Network; PM3 Quantum
Grand Challenges; PM4 Technology and Innovation Hubs;
PM5 Strategic Quantum Infrastructuress and Strategic
Quantum Projects; PM7 innovation procurement; PM8
standards, benchmarking and assurance; PM9 skills and
mobility; PM10 Quantum Investment Service Desk;
Quantum
software and
application
firms
Algorithms, middleware,
control, integration and
sectoral applications
PM2–PM3 research; PM5 Strategic Quantum
Infrastructuress and Strategic Quantum Projects; PM6
Competence and Acceleration Centres; PM7 procurement;
PM8 standards; PM9 skills; PM10 Quantum Investment
Service Desk; PM12 Quantum Business Platform
Component
and enabling-
technology
suppliers
Photonics, electronics,
cryogenics, materials,
packaging, testing and
specialist equipment
PM4 Technology and Innovation hubs; PM5 Strategic
Quantum Infrastructuress and Strategic Quantum Projects;
PM7 procurement; PM8 standards; PM10 Quantum
Investment Service Desk; PM11 strategic intelligence and
dependency monitoring; PM14 strategic international
cooperation
Cybersecurity
and PQC
providers
Cryptographic products,
migration tools, testing and
integration
PM6 Competence and Acceleration Centres; PM7
procurement; PM8 standards; PM9 skills; PM13 quantum-
safe preparedness
Specialised
engineering
and service
firms
Testing, integration,
consultancy, training,
metrology and user support
PM4 Technology and Innovation hubs; PM6 Competence
and Acceleration Centres; PM7 procurement; PM8
standards; PM9 skills; PM12 Quantum Business Platform
SME users
and adopters
Industrial or service-sector
firms experimenting with
or procuring quantum
solutions
PM4 Technology and Innovation hubs; PM6 Competence
and Acceleration Centres; PM7 procurement; PM8
standards; PM9 skills; PM12 Business Platform; PM13
quantum-safe preparedness
SME
infrastructure
operators or
RTO-linked
entities
Access, testing,
qualification and technical
services
PM2–PM4 research and access; PM5 Strategic Quantum
Infrastructuress and Strategic Quantum Projects; PM6
Competence and Acceleration Centres; PM8 standards;
PM9 skills; PM11 strategic intelligence
Table 6.2. Principal SME groups affected under the final PM1–PM16 architecture.
SMEs are not affected uniformly. Hardware and component firms are generally more
capital-intensive and depend more heavily on specialised facilities. Software and service
firms may face lower physical-infrastructure requirements but depend strongly on hardware
access, user demand and interoperability. PQC providers may operate in more mature
markets but interact with existing cybersecurity requirements and assurance schemes. SME
users may benefit from support in identifying viable use cases but may lack the expertise
and resources required for early adoption.
25. DIRECT AND INDIRECT SCOPE
SMEs may be directly affected where they:
• apply for infrastructure access, a voucher, grant, finance or procurement opportunity;
• participate in a European Quantum Science and Technology Excellence Network
activity, Grand Challenge or Strategic Project;
• receive user-support or skills services;
• provide proportionate monitoring information as a condition of support;
• test products against common benchmarks or assurance requirements;
• participate voluntarily in standards, matchmaking or investment-readiness activities;
or
• receive a targeted information request because they operate in a clearly defined
critical category.
81
SMEs may be indirectly affected as suppliers, consortium partners, subcontractors, users or
competitors of supported firms. The initiative does not impose general obligations on all
SMEs or on businesses unrelated to quantum technologies.
26. CONSULTATION OF SME STAKEHOLDERS
SMEs and start-ups were covered through the Call for Evidence, targeted interviews, the
PPMI/d-fine industry survey and exchanges with industry associations. The industry survey
provides the clearest size breakdown.
Organization size Responses Share of total
Micro, 1–9 employees 12 29%
Small, 10–49 employees 14 34%
Medium, 50–250 employees 7 17%
Large, 250–999 employees 4 10%
Very large or global enterprise 3 7%
Other 1 2%
Total 41 100%
Table 6.3. Industry-survey respondents by size.
Approximately 80% of survey respondents were micro, small or medium-sized
organisations. The consultation was not statistically representative, and the number of
larger-company responses was too small to support robust quantitative comparison between
size classes. It nevertheless identified consistent differences in administrative capacity,
financing needs and exposure to fixed testing and qualification costs.
SME concern Design response under PO2
Difficulty identifying and accessing
suitable infrastructure
PM4 common access arrangements and PM6 user-support Centres;
transparent service information, referral and SME-oriented support
High cost of specialised equipment
and expertise
Shared facilities, vouchers, technical assistance and targeted
adaptation of existing centres
Later-stage financing gap Quantum Investment Service Desk combining a structured
investment pipeline, investment-readiness support, access to
appropriate financial products and case-by-case strategic-
capability support through existing or future instruments.
Lack of reference customers PM7 buyer coordination, PCP/PPI, staged procurement and
reference deployments
Complex applications and
fragmented reporting
Common templates, digital processes, staged applications and
once-only information reuse across the package
Fixed testing and assurance costs PM8 common benchmarks, shared testing and reusable results; no
horizontal compulsory certification under PO2
Difficulty participating in
standards
Support for SME participation in pre-standardisation, standards
and testing activities
Concern about recurring supply-
chain reporting
PM11 risk-based, scoped information requests limited to necessary
information unavailable elsewhere
Risk of incumbent advantage Open selection, stage gates, appropriate lotting, multi-supplier
approaches and monitoring of beneficiary concentration
Geographic concentration of
facilities
Distributed PM6 user-support Centres and cross-border access
under PM4
Table 6.4. How SME input influenced the preferred option.
27. ASSESSMENT OF IMPACTS ON SMES
27.0. DIRECT BENEFITS
Infrastructure access and user support. PM4 and PM6 should reduce search, navigation
and negotiation costs and improve access to shared fabrication, testing, metrology,
integration and qualification capabilities. The illustrative scenario indicates that, if 40–120
projects obtain access or qualification one to two months earlier, approximately 40–240
project-months of development could be brought forward annually. The available evidence
does not permit a reliable SME-specific allocation.
82
Research, Grand Challenges, Advanced/Pilot Infrastructures and Strategic Projects.
PM2, PM3 and PM5 can give SMEs access to cross-border consortia, milestone-based
development pathways, specialist capabilities and stronger project visibility. Designation
must not create an automatic funding entitlement or exclude non-designated SMEs from
other support.
Finance. PM10 would establish a Quantum Investment Service Desk helping quantum
SMEs and scale-ups improve investment readiness and access relevant Union, national and
private financing opportunities. It would facilitate referrals and coordination among
financing actors without making individual financing decisions. PO3 would involve a
separate dedicated financing mandate or capacity.
Demand and procurement. PM7 can provide SMEs with early revenues, operational
validation, reference customers, user feedback and stronger evidence for investors. The
procurement scenario indicates that EUR 100 million of well-designed innovation
procurement could be associated with approximately EUR 25–50 million in persistent
supplier revenue and EUR 10–20 million in additional private investment. These
coefficients are illustrative and not quantum-specific forecasts.
Standards and trusted deployment. PM8 should reduce repeated testing and buyer
uncertainty through common terminology, benchmarks, test methods and interoperability
profiles. SMEs may benefit particularly because they have less capacity than large firms to
negotiate bespoke technical requirements with each customer.
Skills and user capability. PM9 should improve access to engineering, software,
integration, cybersecurity, procurement, product-development and commercialisation
capabilities.
Strategic intelligence, matchmaking and international cooperation. PM11, PM12 and
PM14 can improve visibility of supply-chain opportunities, users, investors, partners and
emerging risks, subject to confidentiality, data minimisation and separation between
voluntary commercial functions and regulatory information requests.
27.1. QUANTIFIED BUSINESS-FACING COSTS AND SAVINGS
The model reports costs for businesses and other private actors as a whole. It does not
provide a reliable allocation between micro, small, medium-sized and large firms. The
values below must therefore not be presented as SME-specific costs.
Business/private-actor result, EUR million NPV PO1 PO2 PO3
Total costs 2.77 8.83 26.94
Modelled savings 2.07 6.45 6.70
Net modelled business cost 0.70 2.38 20.24
Of total costs: administrative costs 0.00 5.50 16.41
Of total costs: administrative costs within One-In, One-
Out
0.00 5.46 16.28
Of total costs: adjustment costs 0.00 0.00 7.20
Of total costs: participation without a legal requirement
(not a compliance cost)
2.77 3.33 3.33
Table 6.5. Business-facing costs and modelled business savings. Values are not SME-specific.
Under PO2, the directly modelled net business cost is modest: EUR 8.83 million NPV of
business and private-actor costs is set against EUR 6.45 million of modelled business-side
savings, leaving a net directly modelled cost of EUR 2.38 million. This does not include
wider benefits from improved infrastructure access, finance, firm survival or growth.
The PO2 business costs comprise EUR 5.50 million NPV of administrative costs, of which
EUR 5.46 million fall within One-In, One-Out (including EUR 1.23 million of evidence on
PQC requirements in public procurement), and EUR 3.33 million of time that firms choose
83
to spend in the new structures without a legal requirement, which is not a compliance cost6.
No business adjustment costs are modelled under PO2. The PO3 figures are materially
higher because the option introduces wider dependency reporting, binding PQC-
preparedness duties for defined critical entities (business adjustment costs of EUR 7.20
million) and more intensive procurement conditions.
Under PO3, targeted binding PQC-preparedness duties could also affect SMEs that fall
within the defined critical-actor population. The model does not assume that all quantum or
cybersecurity SMEs would be covered. Scope thresholds, technical assistance, phased
implementation, reuse of existing documentation and proportionate reporting would be
necessary to avoid disproportionate fixed costs.
27.2. PRINCIPAL SME-FACING ACTIVITIES
Activity Likely frequency Indicative burden Nature
User-support orientation or
initial infrastructure request
Per request Low Voluntary
Application for infrastructure
support or a voucher
Per application Low–moderate Voluntary
Grand Challenge or project
application
Per application Moderate Voluntary
Strategic Project application Per application Moderate–high Voluntary
Reporting for a supported
project or facility
Normally annual or
milestone-based
Moderate Condition of support
Procurement participation Per procedure Moderate–high Voluntary
Evidence of compliance with
PQC requirements in public
procurement
Per procedure
where the
requirements apply
Low Condition of taking
part in the procedure
Standards, benchmarking or
testing participation
Activity-dependent Moderate Normally voluntary
Targeted strategic-intelligence
request
Risk-based, not
routine
Low–moderate;
potentially higher in
complex cases
Mandatory only where
a legal basis applies
Table 6.6. Indicative SME-facing activities. Detailed assumptions are provided in Annex 4 .
27.3. INDIRECT IMPACTS
Expected positive indirect impacts include:
• stronger investor and customer confidence;
• growth of European supplier networks and cross-border consortia;
• improved visibility of commercial and procurement opportunities;
• reduced risk of project disruption and technical lock-in;
• improved access to large industrial and public users; and
• greater capacity to retain intellectual property, employment and industrial activity in
the Union.
Potential negative indirect impacts include:
• concentration of support among firms already connected to established clusters;
• advantage for incumbents able to co-finance or manage complex applications;
• procurement or assurance requirements favouring established technologies;
• exclusive or proprietary infrastructure arrangements;
6 Administrative costs comprise information obligations attached to Union funding, Strategic Project
designation, supported procurement, PQC requirements in public procurement and targeted requests (EUR
4.78 million NPV) and the requirements for taking part in regulatory sandboxes, the business platform and
investment support (EUR 0.72 million); documentation for investment support (EUR 0.05 million) is not offset
under One-In, One-Out (Tool #58, Box 4). Displayed components are rounded; total business/private-actor
costs are EUR 8.83 million NPV.
84
• increased competition for scarce skills;
• requirements being applied before smaller firms or technologies are sufficiently
mature; and
• possible disclosure of commercially sensitive supplier information.
28. DISPROPORTIONATE IMPACTS AND MITIGATING MEASURES
Fixed regulatory and administrative costs generally affect smaller firms more strongly
because they are spread over fewer employees and lower revenues and because SMEs have
fewer dedicated legal, regulatory and public-affairs resources. A general SME exemption
would not be appropriate: most participation is voluntary, while a blanket exemption could
create a material evidence gap where a micro or small company is the sole supplier of a
critical component. The preferred approach is proportionality by design.
Potential disproportionate effect Mitigating measure
Fixed application costs Short standard forms, staged applications and reuse of company
information
Difficulty navigating programmes and
facilities
Common digital interface and personalised support through
PM6 Competence and Acceleration Centres
Limited capacity to prepare technical
proposals
Technical assistance, brokerage and consortium-building
support
Cost of facility access Vouchers, transparent pricing and proportionate co-financing
High reporting burden Minimum necessary indicators, once-only submission and
consolidated reporting
Standards and testing costs Supported participation, shared testing, reusable results and no
general compulsory certification under PO2
Procurement favouring large firms Staged PCP/PPI, appropriate lotting, consortia and functional
specifications
Cash-flow pressure Proportionate pre-financing and payment schedules under the
relevant programme rules
Requirements introduced before
maturity
Phased implementation, maturity tests and review clauses
Strategic-intelligence requests Risk-based scope, data minimisation, confidentiality safeguards
and adjusted deadlines
Difficulty proving SME status Use only the SME-definition criteria necessary for the measure
and avoid repeated verification
Geographic concentration of benefits Cross-border access, widening outreach and monitoring by
Member State, region and firm size
Table 6.7. SME mitigating measures.
Commission Recommendation 2003/361/EC and any successor definition should be used
only where an SME-specific measure requires it. Repeated proof of SME status should be
avoided because application of the definition itself creates administrative cost.
29. MONITORING OF SME IMPACTS
Because the initiative is highly relevant for SMEs, the monitoring framework should include
SME-specific indicators collected through existing programme and administrative systems
wherever possible.
Dimension Indicator
Participation Number and share of micro, small and medium-sized applicants, users and
beneficiaries
Access SME access requests, approval rates, waiting times and cross-border use
Finance Finance committed to SMEs; private leverage; follow-on rounds and cross-border
syndication
Procurement SME participation and success in PCP/PPI; pilots progressing to reference
deployment or repeat procurement
Burden Application and reporting staff time by firm size; duplicate requests avoided
85
Standards SME participation in standards, benchmarking and testing; use of supported testing
Growth Supported firms reaching employment, revenue, investment or market-entry
milestones
Competition Beneficiary and supplier concentration; participation of new entrants
Geography SME beneficiaries and users by Member State and region
Resilience Number of SME suppliers receiving targeted requests and average response burden
Table 6.8.SME monitoring indicators.
Indicators should be disaggregated by company size without creating a new recurring reporting system. Data
already available through calls, procurement, finance, infrastructure-access and programme-monitoring
systems should be reused.
30. ONE-IN, ONE-OUT AND THE SME BURDEN-REDUCTION TARGET
Under PO2, new business administrative burdens within the scope of One-In, One-Out are
estimated at EUR 5.46 million NPV, equivalent to approximately EUR 0.621 million per
year across the affected business population. The estimate cannot currently be allocated
reliably between SMEs and larger businesses.
The model identifies EUR 6.45 million NPV of modelled savings accruing to businesses.
These are economic benefits but are not automatically treated as formal One-In, One-Out
offsets because they do not necessarily result from the repeal or simplification of an existing
Union information obligation. No amount should therefore be reported as a contribution to
the SME burden-reduction target unless the final legal obligations and monitoring data
distinguish qualifying administrative INs and OUTs by company size.
31. OVERALL CONCLUSION
The preferred option is expected to have a positive overall effect on SMEs because its main
economic measures address the constraints faced by young and smaller quantum firms:
access to specialised facilities, growth finance, first customers, technical and user skills,
standards support and trusted deployment pathways.
SMEs may nevertheless face proportionately greater fixed application, reporting, testing and
qualification costs than larger firms. The positive assessment therefore depends on effective
implementation of simplified procedures, technical assistance, once-only reporting,
proportionate information requests, maturity-sensitive requirements, open infrastructure
access and contestable procurement.
A blanket SME exemption is neither necessary nor appropriate. Most business participation
is voluntary, while narrowly defined obligations may be necessary where a small firm
performs a critical supply-chain role. Proportionality by size, activity, risk and
administrative capacity provides the more effective safeguard.
86
ANNEX 7: KEY TECHNICAL CONCEPTS
Quantum technologies (QT) exploit quantum-mechanical effects (notably superposition,
entanglement and quantum measurement7) to enable capabilities that are difficult or
impossible to achieve with classical technologies. In policy terms, quantum technologies are
usually grouped into three pillars: quantum computing and simulation, quantum
communication, and quantum sensing. While these pillars share scientific foundations, they
have different industrial value chains, maturity profiles, infrastructure needs, and
standardisation/trust requirements. This annex clarifies the key technical concepts needed to
understand the intervention logic, the measures and the impacts assessed in this impact
assessment.
In simplified terms, superposition allows a quantum system to be described by a
combination of several possible states until it is measured, while entanglement creates
correlations between quantum systems that cannot be reproduced by classical systems.
Together with quantum measurement and other quantum effects, these properties underpin
the capabilities exploited by quantum technologies.
32. QUANTUM TECHNOLOGIES AND THEIR VALUE CHAINS
Quantum technologies do not form a single, linear value chain. They comprise several
overlapping ecosystems covering quantum computing and simulation, quantum
communication, and quantum sensing and metrology. These ecosystems use different
physical platforms, components and infrastructures, but share important enabling
technologies, including advanced semiconductors, photonics, lasers, cryogenics, vacuum
systems, control electronics, specialised materials, software, classical computing and
metrology. The same supplier, facility or technical capability may therefore support more
than one quantum pillar.
For the purposes of this impact assessment, a quantum-technology value chain covers the
progression from scientific knowledge and enabling inputs to integrated systems,
deployment and operational use. It includes the following functional layers:
Value-chain layer Typical activities and inputs Principal policy relevance
Research and
technology
development
Fundamental and applied research;
development of qubit, photon, atomic,
material and device concepts; algorithms
and protocols
Scientific excellence, common
priorities, intellectual property,
researcher mobility and progression
towards higher technological maturity
Enabling
components and
fabrication
Semiconductor and photonic devices,
specialised materials, lasers, detectors,
cryogenic and vacuum equipment, control
and readout electronics, timing and
frequency components
Access to fabrication and pilot-line
capacity, supplier concentration,
production scale, qualification and
critical dependencies
Subsystem and
system integration
Integration of quantum devices with control
systems, packaging, classical computing,
communications equipment, power and
thermal-management systems
Engineering capability,
interoperability, systems integration,
access to testbeds and progression
from laboratory prototypes to
deployable systems
Software, control
and service layers
Firmware, control software, compilers,
middleware, algorithms, orchestration
platforms, network-management tools,
cloud or HPC integration and application
software
Hardware–software integration,
portability, access to systems, user
capability, cybersecurity and
development of commercial services
7 In simplified terms, superposition allows a quantum system to be described by several possible states until it
is measured, while entanglement creates correlations between quantum systems that cannot be reproduced by
classical systems.
87
Testing,
measurement and
qualification
Metrology, calibration, performance
benchmarking, reliability and
environmental testing, interoperability
testing, security evaluation and conformity
assessment where appropriate
Comparable performance claims,
trusted deployment, procurement
readiness, supplier substitution and
avoidance of premature technological
lock-in
Deployment,
operation and
market uptake
Installation, integration into user
environments, procurement, maintenance,
upgrades, training, customer support and
application development
First buyers, reference deployments,
user skills, operational evidence,
repeat demand and financing
continuity
Table 7.1. Quantum value-chain functional layers
This representation is functional rather than institutional. A company or research
organisation may operate at several layers, while some functions may be performed through
shared facilities or partnerships. The boundaries also evolve as technologies mature. For
example, an activity conducted within a research infrastructure may later become a
commercial testing or manufacturing service. Conversely, an apparently mature component
may still require substantial redesign or qualification when integrated into a different
quantum platform.
The value chains are also highly international and technically interdependent. System
developers may have visibility over their direct suppliers but less information on the origin,
concentration, production capacity and substitutability of upstream sub-components,
materials, software or specialised services. A dependency is therefore not established merely
because an input is sourced outside the Union. Strategic concern arises where external
sourcing is combined with supplier concentration, limited substitutability, long lead times,
difficult redesign or requalification, foreign control, or risks affecting secure and continuous
operation.
The three pillars have different maturity profiles and bottlenecks. Quantum-computing value
chains place particular emphasis on QPU fabrication, control, cryogenic or optical systems,
software and integration with classical computing. Quantum-communication value chains
depend strongly on photonic components, sources, detectors, network equipment and
interoperability and security arrangements. Quantum-sensing and metrology value chains
include a wide variety of atomic, photonic, solid-state and precision-measurement platforms,
often requiring application-specific integration and qualification. These differences mean
that infrastructure, standards, assurance and market-support measures should be adapted to
the relevant technology and maturity rather than applied uniformly across the sector.
For the intervention logic, the value-chain perspective helps identify where discontinuities
occur between research and engineering; between components and integrated systems;
between prototypes and qualified products; between early public support and scale-up
finance; and between pilot deployment and repeat demand. It also explains why isolated
measures are unlikely to be sufficient. Research, industrialisation infrastructure, finance,
procurement, skills, standards and dependency monitoring must operate as connected but
non-automatic pathways, while preserving competition, technological neutrality and the
responsibilities of the competent programmes and authorities.
33. QUANTUM COMPUTING AND SIMULATION
A quantum computer processes information using qubits, which can represent combinations
of 0 and 1 and can be entangled with each other. A quantum computing system is not a single
device, but a stack of tightly coupled subsystems: the QPU (quantum processing unit), the
control electronics (microwave/laser control and readout), the cryogenic and vacuum
infrastructure (for certain platforms), classical compute for orchestration, and a software
toolchain for compiling and running quantum programs. The performance of a quantum
system is not adequately described by a single metric (e.g., “number of qubits”); what
88
matters is the ability to execute circuits reliably, which depends on error rates, connectivity,
stability, and the classical control environment.
In the near term (“NISQ” era), quantum computing is expected to deliver value in selected
domains through hybrid workflows, where classical HPC/cloud systems handle data
preparation and optimisation loops while the QPU is used for specific quantum subroutines.
Over the longer term, fault-tolerant quantum computing aims to run complex algorithms
reliably using quantum error correction, but requires substantial advances in hardware
stability, fabrication, control and systems engineering.
34. QUANTUM COMMUNICATION
Quantum communication includes technologies that use quantum states to transmit
information or enable security properties. The most mature application today is quantum
key distribution (QKD), which enables detection of eavesdropping under defined
assumptions, and is often discussed alongside post-quantum cryptography (PQC), which is
classical cryptography designed to resist attacks from future quantum computers. Quantum
communication systems rely on components such as photon sources, detectors,
timing/synchronisation, optics, and networking integration, and require interoperability and
trust frameworks to support deployment in critical contexts.
The assessment distinguishes the technical PQC transition already expected under the
coordinated roadmap and sectoral cybersecurity frameworks from the incremental effects of
the Quantum Act options. PO1 adds no PQC-specific measure beyond the dynamic baseline.
PO2 provides for a biennial EU preparedness assessment based on information from
Member States and Union entities, coordinated exercises and PQC requirements in public
procurement, and establishes structured cooperation on PQC between the Commission,
Member States and relevant bodies to coordinate implementation and monitor progress
under the existing PQC roadmap. PO3 additionally tests binding implementation of the
existing PQC roadmap through time-bound migration requirements. These duties would not
replace applicable PQC standards or create a parallel cybersecurity regime.
35. QUANTUM SENSING
Quantum sensing uses quantum effects to achieve higher precision or sensitivity in
measurement (time, gravity, inertial, magnetic/electric fields, etc.). Unlike quantum
computing, many sensing technologies can reach application readiness earlier, but still face
scale-up challenges linked to manufacturing reproducibility, calibration, metrology, and
certification for regulated environments.
89
Figure 7.1. Quantum technologies landscape. Three pillars (QC/QSim, QComm, QSensing)
with typical use cases, dominant bottlenecks, and maturity bands
36. THE QUANTUM COMPUTING STACK AND WHAT “CAPACITY” MEANS
36.0. HARDWARE PLATFORMS AND SYSTEM COMPONENTS
Qubits can be realised using different physical platforms (e.g., superconducting circuits,
trapped ions, neutral atoms, photonics, spin-based systems). Each platform has its own
supply chain and manufacturing constraints, but most systems require:
• a QPU with qubits and couplers/interconnects
• control and readout electronics (often high-frequency)
• cryogenics/vacuum/laser infrastructure depending on the platform
• classical compute for control loops and data processing
• system integration and packaging
This means that “industrialisation” is not only a matter of producing qubits, but of producing
repeatable full systems with predictable performance and maintainability.
36.1. PERFORMANCE METRICS AND WHY THEY ARE MULTI-DIMENSIONAL
Commonly cited metrics include qubit count, gate fidelity, coherence times, circuit depth,
connectivity, uptime, and calibration stability. For policy purposes, a useful way to
communicate “capacity” is to distinguish:
• physical capability (raw hardware scale and stability)
• usable capability (how reliably useful circuits can be executed)
• application readiness (availability of toolchains, benchmarks, and user support for
real tasks)
Because no single metric captures these dimensions, benchmarking needs to be contextual
(by platform and use case) and should avoid simplistic comparisons.
90
Figure 7.2. The quantum computing stack.
37. FROM LAB TO FAB: MATURITY, PILOT LINES, QUALIFICATION AND “STAGE-
GATES”
37.0. WHY THE LAB-TO-FAB GAP IS STRUCTURAL
Quantum technologies often face discontinuities between early R&I and industrial
deployment because scaling requires reproducible fabrication, packaging, calibration
workflows, quality control, component supply stability, and trained engineering teams. Even
when prototypes work in a lab environment, industrial contexts require repeatability,
serviceability, and predictable performance.
37.1. PILOT LINES, METROLOGY AND QUALIFICATION
Pilot lines are pre-production environments that establish repeatable processes and produce
small volumes with quality control. For quantum, pilot-line capacity often needs to be
complemented by metrology and qualification capabilities: measurement, calibration, and
testing protocols that allow claims about performance and interoperability to be trusted
across sites and sectors. These elements are central to the Act’s logic on scaling capacity
and enabling trusted deployment.
37.2. STAGE-GATES (TRL CONTINUITY)
A stage-gate approach is a milestone-based method to ensure continuity across TRL steps
(from research to demonstrators to early industrialisation). For quantum, stage-gates can
include agreed evidence packs (benchmarks, stability tests, integration readiness), reducing
the risk of “stop-start” funding and accelerating progression through the pipeline.
Figure 7.3. Lab-to-fab pipeline with stage-gates. TRL3–7 pathway showing where testbeds, pilot lines,
qualification, Advanced/Pilot Quantum Infrastructure and Strategic Projects sit.
91
38. ACCESS, USER SUPPORT AND HYBRID WORKFLOWS (HPC–QUANTUM
INTEGRATION)
Quantum systems require specialised access conditions (booking, calibration windows,
tooling, security policies, IP/confidentiality handling). For many users—especially SMEs—
the main barrier is not theoretical knowledge, but navigation cost: understanding where to
access, what prerequisites exist, how to benchmark, and how to integrate results into
workflows. “Access + user support” therefore has a technical dimension (interfaces,
toolchains, data formats) and an operational one (service catalogues, response times, support
expertise).
In practical deployments, quantum computing is often used in hybrid mode, where classical
HPC or cloud resources handle large-scale data processing and optimisation loops while the
quantum device is used for targeted subroutines. This is why the Act discusses access and
adoption in a way that is connected to existing compute infrastructures and user-support
networks.
Figure 7.4. Hybrid classical–quantum workflow. Data preparation → classical optimiser → quantum circuit
execution → measurement → classical update loop → application result
39. TRUST, INTEROPERABILITY AND CONFORMITY (WHY “TRUSTED
DEPLOYMENT” MATTERS)
For deployments in defined critical or sensitive contexts, trust requirements become central.
“Trusted deployment” refers to the ability to rely on the system’s performance, security
properties, and interoperability in a way that is consistent across stakeholders (operators,
procurers, regulators). Technically, this often requires:
• interoperability profiles (constrained subsets of standards that ensure two
implementations actually work together)
• reference implementations / test suites (to reduce ambiguity)
• interoperability testing events (multi-vendor testing of profiles)
• proportionate conformity pathways in defined contexts (evidence that requirements
are met)
The goal is not to impose blanket requirements on all quantum activity, but to enable
adoption where assurance is necessary and to reduce uncertainty for procurers and operators.
92
Figure 7.5. Trusted deployment pathway. Standards roadmap → profiles → reference implementations/test
suites → interoperability testing → (where justified) conformity evidence for defined critical/sensitive uses.
40. DEPENDENCIES, ENABLING TECHNOLOGIES AND RESILIENCE
Quantum systems depend on a set of enabling technologies and components that can be
concentrated in limited supply chains: cryogenics, lasers, electronics, specialised materials,
optics, detectors, timing and control systems. Resilience requires visibility of chokepoints,
diversification options, and the ability to coordinate mitigation when risks become systemic.
This motivates the Act’s focus on dependency mapping, monitoring/early warning, and
targeted Strategic Projects for chokepoints.
Figure 7.6. Quantum supply chain “chokepoints map”. Enabling components → subsystem integrators →
system builders → deployments/users, with highlighted high-risk dependencies
93
ANNEX 8: DETAILED IMPLEMENTATION AND IMPACTS
41. PURPOSE, SCOPE AND ANALYTICAL CONVENTIONS
This annex provides the detailed assessment of the implications of the retained policy
options for the EU Quantum Act relative to the dynamic baseline, Policy Option 0. It
expands Chapters 6 and 7 of the Main Report and links the option-level conclusions to the
final PM1–PM16 architecture. It also includes a more detailed description of potential
impacts of the PMs.
The principal policy horizon is 2030, in line with the Quantum Europe Strategy. Costs are
modelled over 2028–2037 in real 2024 prices. Longer-term industrial, resilience and security
effects are assessed qualitatively or through scenarios where robust forecasting is not
possible.
The assessment distinguishes societal resource costs, administrative burdens, adjustment
costs, public-budget expenditure, transfers, financing volumes and scenario-only effects.
Financing volumes and public expenditure are not treated automatically as societal costs or
benefits. User-fee receipts and transfers are not added to welfare benefits.
Only effects with a sufficiently explicit causal pathway are monetised. Innovation, scale-up,
resilience, skills, territorial and long-term productivity effects are principally assessed
through qualitative evidence, ranges and monitoring indicators. The central infrastructure
case assumes reuse of existing laboratories and centres, with only marginal service and
targeted adaptation resources counted. A full-build scenario is retained only as a stress test.
Measures are assessed with technology-neutral criteria and differentiation by maturity.
Binding or assurance requirements are considered only for clearly defined mature
applications. Uncertainty is reflected through low, central and high assumptions,
deterministic scenarios and switching values. All quantitative results are incremental to the
dynamic baseline. Monetary values are expressed in real 2024 prices and present value over
2028–2037 using a 3% real discount rate. Societal resource costs, administrative burdens,
public-budget expenditure, transfers and financing volumes are reported separately and must
not be added together.
94
42. OVERVIEW OF IMPACT PATHWAYS AND PRINCIPAL POLICY MEASURES.
Impact pathway
and principal
policy measures
Main expected
positive effects
Main potential
negative effects and
trade-offs
Differences across
the options
Evidence and
uncertainty
EU-level
coordination of
activities and
strategic
programming:
PM1, PM15 and
PM16
Better alignment of
Union and national
priorities, and
identification of
gaps. Coordination
can bring
economies of scale
(avoiding
fragmentation and
waste of resources)
and faster
technological
progress through
prioritisation, by
focusing financial
and human
resources on agreed
S&T objectives,
technological and
engineering
challenges.
Stronger coordination
may require more
time to establish and
may reduce the
flexibility of national
programmes.
PO1 relies on
voluntary
alignment.
PO2 introduces
structured planning
and review
mechanisms.
PO3 maintains the
same planning and
governance
arrangements as
PO2.
High confidence for
institutional outputs
and costs; medium
confidence for
reduced
fragmentation and
improved alignment
of investments.
R&I excellence,
industrialisation
and deployment:
PM2–PM6
Greater scientific
critical mass to
address grand S&T
challenges;
accelerated
progress from
research and
technology
development to
industrialisation;
faster quantum
deployment.
Risk of premature
technology choices,
under-utilisation of
facilities, geographic
concentration and
opportunity costs for
other R&I priorities.
PO1 primarily
improves
cooperation and
information
exchange on a
voluntary basis.
PO2 establishes
Grand Challenges,
Hubs, Centres and
Strategic Projects.
PO3 maintains the
same arrangements
as PO2.
Medium confidence;
effects depend on
technological
maturity, the quality
of selected facilities,
the demand for
facilities, utilisation
rates and available
programme
resources.
Scale-up finance
and strategic
capabilities:
PM5, PM10 and
PM12
Improved
investment
readiness and
greater continuity
of financing;
enhanced
opportunities for
co-investment
between EU and
MS and public
financial actors and
private investors,
and stronger
capacity to retain
strategically
important firms and
capabilities.
Crowding out of
private finance,
financial exposure to
technological failure,
selection risks and
concentration of
support.
PO1 supports
investor
coordination and
referral
mechanisms.
PO2 establishes a
structured
investment pipeline
through existing or
future instruments.
PO3 introduces
dedicated mandate
or risk-bearing
capacity (cf.
PM10).
Medium confidence
in improved
financing
coordination; lower
confidence in
additional
investment, firm
growth and outcomes
related to strategic
capabilities.
95
Demand, first
buyers and SME
market access:
PM5, PM6, PM7
and PM12
Stronger links
between suppliers
and users,
reference
deployments,
customer
validation, and the
use of innovation
procurement to
help translate pilots
into follow-on
demand and wider
market uptake.
Procurement price
premiums, reduced
bidder participation
in procurements, the
purchase of immature
technologies and
risks of technology
lock-in.
PO1 sets voluntary
frameworks for
coordination
among buyers.
PO2 supports
coordinated
PCP/PPI and
reference
deployments based
on common use
cases and
functional
specifications.
PO3 applies
mandatory
requirements in
wider, predefined
procurement
categories.
Medium-to-low
confidence as effects
depend on buyer
participation,
supplier availability,
market maturity,
procurement scale
and the extent to
which initial
procurement
translates into repeat
demand.
Skills, social and
territorial
impacts:
PM6 and PM9,
supported by
PM2-PM6
Increased technical,
engineering and
user capabilities;
practical training
and mobility;
broader access to
support and
expertise across
Member States.
Skills shortages and
wage pressure may
increase; benefits
may concentrate in
established firms,
universities and
competence centres;
smaller or weaker
ecosystems may face
access barriers.
PO1 improves
information
provision and
sharing.
PO2 connects skills
and user support to
projects, facilities
and procurement.
PO3 has the same
arrangements as
PO2.
Overall positive
effects are expected,
but employment and
regional outcomes
cannot be reliably
assessed until
programme scale,
project location and
market demand are
clearer.
Standards,
trusted
deployment and
quantum-safe
preparedness:
PM8 and PM13,
supported by
PM7
Greater
comparability,
interoperability
across quantum and
quantum-classical
hybrid platforms;
and buyer
confidence; lower
testing and due-
diligence costs;
stronger PQC
implementation
preparedness.
Premature standards
or assurance
requirements could
create technological
lock-in; testing and
compliance costs may
impose a
disproportionate
burden on SMEs; risk
of overlap with
cybersecurity
frameworks.
PO1 supports
voluntary pre-
standardisation
activities but adds
no PQC-specific
measure beyond
the baseline. PO2
adds a biennial
preparedness
assessment,
coordinated
exercises, PQC
requirements in
public procurement
and structured
QSB–NIS
Cooperation Group
cooperation
alongside standards
and testing. PO3
further introduces
binding
implementation of
the PQC roadmap,
including testing,
verification and
certification in
critical
infrastructures.
Medium confidence
as regards
coordination and
preparedness.
Benefits stemming
from the baseline
PQC transition are
not attributed to the
Act; any additional
avoided- effects in
terms of security-loss
remain highly
uncertain.
96
Dependencies,
resilience and
international
cooperation:
PM11 and
PM14, supported
by PM5, PM7
and PM10
Improved visibility
of chokepoints, and
critical technology
dependencies,
earlier warning of
emerging
vulnerabilities,
greater
diversification,
enhanced
qualification of
alternative-supplier
and trusted
international
partnerships.
Costs related to
supply chain mapping
and mitigation;
potential exposure of
trade secrets; possible
constraints on
beneficial investment,
cooperation and
supplier choice.
PO1 relies on
publicly available
and voluntary
information to map
the quantum supply
chain.
PO2 introduces
targeted
information
requests and
referrals for
mitigation
measures.
PO3 extends
mandatory
reporting and
mitigation planning
to a broader set of
defined critical
categories.
Medium confidence
as regards improved
visibility; lower
confidence as regards
disruption avoidance,
substitution lead
times and the
effectiveness of
mitigation measures.
Environmental
and resource
impacts:
PM3–PM5 and
PM7
Shared
infrastructure may
improve utilisation
rates and avoid
unnecessary
duplication of
capacity; selected
applications may
support
improvements in
energy use,
materials, logistics
and environmental
monitoring.
Additional impacts
may arise from
electricity demand,
cooling, water,
cleanroom
requirements,
specialist-material
and equipment-
related waste; under-
utilised infrastructure
may generate
environmental costs
without
corresponding
benefits.
PO1 has limited
direct effects.
PO2 may generate
localised impacts
through selected
facilities and their
deployment.
PO3 has the same
central
infrastructure
configuration as
PO2; any higher
impacts would
arise only from
separate future
deployment
decisions.
Low-to-medium
confidence. Effects
depend on
technology mix,
utilisation rates and
energy sources.
Application-level
benefits should be
recognised only
where they are
demonstrated against
relevant conventional
alternatives.
Administrative
burden and
implementation:
PM5, PM7, PM8,
PM11 and PM13
Improved
cybersecurity
preparedness,
lowering the risk of
incidents, data
breaches and
service disruptions.
Transparent project
and access
procedures make
requirements
clearer and more
predictable,
reducing delays
and duplications.
Digital and
reusable
information
processes further
simplify
administrative
burdens.
Possible effects
concern the freedom
to conduct business,
intellectual property,
personal data
protection, trade
secrets, equal
treatment and the
right to good
administration, as
well as additional
staffing, application,
monitoring and
compliance costs.
PO1 has limited
direct implications.
PO2 would
introduce targeted
obligations for
clearly defined
actors.
PO3 would affect a
broader set of
actors and require
stronger
safeguards,
enhanced
supervision and
greater
administrative
capacity.
High confidence in
the relative ordering
of costs but only a
medium level of
confidence in
realised
simplification
savings and
implementation
capacity.
Table 8.1. Impacts per related group of Policy Measures
97
43. DETAILED IMPACTS BY INTERVENTION DIMENSION
Dimension PO1 PO2 PO3 Evidence and
uncertainty
Coordination
and
programming
Better information
exchange and
voluntary
alignment;
coverage depends
on participation
Common planning
and review
covering all
Member States,
with structured
national inputs
Binding multiannual
planning, broader
reporting and stronger
central steering
High confidence for
institutional coverage;
medium confidence for
reduced fragmentation
and improved
investment alignment
R&I and
industrialization
Improved
visibility and
navigation; no
formal hubs or
Strategic Projects
Selected hubs,
user-support
Centres, Grand
Challenges,
Strategic
Quantum
Infrastructuress
and Strategic
Project
designation
Same physical
infrastructure profile
as PO2; more
centralised portfolio
management and
stronger priority
treatment. Additional
capacity is outside the
central quantified
case.
Medium confidence;
depends on facility
selection, utilization,
program resources and
technology maturity
Scale-up finance Investor
coordination,
finance readiness
and referral
Structured
investment
pipeline and
thematic window
within existing
instruments
Dedicated risk-
bearing financial
capacity
Mobilization scenarios
suggest EUR 150–
350m of private co-
investment per EUR
100m of Union risk-
bearing finance;
illustrative, not a
forecast
Demand and
first buyers
Buyer groups,
market
consultation and
guidance
Coordinated
PCP/PPI,
reference
deployments and
targeted
conditions in
selected strategic
procurements
Broader preference or
eligibility conditions
across defined
categories
Medium-to-low
confidence; depends on
buyer participation,
market maturity,
pipeline size and
supplier availability
Skills and user
capabilities
Better information
and voluntary
coordination
Training, mobility
and user-support
actions linked to
infrastructures,
projects and
procurement
Broader national
planning and
reporting
Positive direction
expected, but
employment and skills
totals cannot be forecast
before program scale
and demand are known
98
Standards and
quantum-safe
deployment
Pre-
standardization
support; no
additional PQC-
specific measure
beyond the
baseline
Structured
standards and
benchmarking
programme;
voluntary
assurance;
structured
cooperation
between the
Commission,
Member States
and relevant
bodies on
implementation of
the PQC roadmap;
biennial
preparedness
assessment,
coordinated
exercises and
PQC requirements
in public
procurement
PO2 structured
standards and PQC
cooperation,
supplemented by
binding
implementation of the
existing PQC
roadmap through
time-bound migration
requirements for
defined critical public
authorities and, where
justified, critical
operators.
Medium confidence for
coordination and
assurance pathways.
PM13c costs and
effects are sensitive to
the covered population,
reporting frequency,
reuse of existing plans
and inventories, and
supervisory intensity.
Avoided-security-loss
effects remain scenario-
only and do not affect
the central ranking.
Dependencies
and resilience
Voluntary
dashboard and
existing
cooperation
channels
Scoped strategic
mapping, targeted
requests, early
warning and links
to mitigation
Broader ecosystem
reporting and stronger
monitoring coverage
Medium confidence for
visibility; lower
confidence for the scale
and timing of avoided
disruption
Table 8.2. Detailed impacts by intervention dimension.
44. BASELINE INDICATORS PER SPECIFIC OBJECTIVE
Specific Objective Baseline Indicators
SO-A – R&I
alignment and
delivery
Fragmented programming despite
substantial investment: EU and
Member States invest significantly in
quantum, but priorities, programmes
and investments remain insufficiently
coordinated.
• Share of MS quantum strategies/programmes
aligned with common EU priorities
• Number of joint/co-programmed EU-MS
R&I initiatives
SO-B – Lab-to-fab
and shared
infrastructures
Limited industrialisation capacity: six
quantum chip pilot lines and a
quantum design facility are being
established; access to existing
infrastructure remains fragmented.
• Number and capacity of EU-accessible pilot
lines/design/fab facilities
• Cross-border users/projects
• Time and cost from prototype to industrial
validation
• Technologies progressing from lab to
pilot/production
SO-C – Scale-up and
financing continuity
Strong start-up base but weak scale-
up: the EU hosts about one-third of
global quantum companies, but has a
much smaller share of global quantum
patents and private investment.
• Annual EU quantum VC/private investment
• EU share of global quantum VC
• Number/value of Series B+ investments
• EU quantum companies scaling in Europe
SO-D – Demand pull
and first buyers
Market uptake lags scientific and
entrepreneurial strength: Europe has a
strong company base, but limited lead-
user engagement, reference
deployments and repeat procurement.
• Number/value of public and industrial
procurements
• Reference deployments progressing to repeat
procurement
99
Specific Objective Baseline Indicators
• Number of industrial/public users
• EU quantum technology revenues
SO-E – Skills and
user support
Strong scientific base but industrial
skills shortages: Europe has a large
quantum talent pool, but shortages
remain in engineering, software,
technical, operational and user-side
skills.
• Quantum graduates and industry
professionals
• Quantum vacancies / skills gaps
• People trained through EU/MS programmes
• Cross-border mobility of quantum talent
SO-F – Trusted and
quantum-safe
deployment
Standards and assurance are still
developing: common EU approaches
to standards, benchmarking and
testing are not yet established across
the ecosystem; Member States are
beginning to implement the
coordinated PQC roadmap.
• European/international standards and
benchmarks adopted
• Technologies/products assessed against
common methods
• MS implementation of PQC roadmap
milestones
• Critical systems assessed for PQC readiness
SO-G –
Dependencies and
economic security
Critical dependencies remain
insufficiently mapped: supply-chain
assessments are being developed
across materials, precision
components, control electronics and
software.
• Share of critical value-chain segments
covered by dependency assessments
• Critical dependencies with mitigation
measures
• Supplier concentration for critical
components
• EU share of production/capacity for strategic
components
45. OVERVIEW OF PRINCIPAL EXPECTED EFFECTS BY INTERVENTION DIMENSION
Specific objective
and principal
policy measures
Main expected positive
effects
Main potential
negative effects and
trade-offs
Differences across the
options
SO-A – Improve
EU–Member
State R&I
alignment and
delivery to sustain
S&T excellence –
PM1, PM15,
PM16
Economies of scale
through reduced
fragmentation and the
elimination of avoidable
duplication; concentration
of financial and human
resources around agreed
S&T, technological and
engineering priorities;
improved identification of
gaps and better
coordination of
investments and
implementation;
potentially faster
technological progress.
Enhanced coordination
between EU and
Member States takes
time and resources to
establish; possible
overlaps with existing
governance structures;
excessive central
steering could reduce
national flexibility.
PO1: voluntary
information exchange and
alignment.
PO2: structured common
programming, a Strategy
Board and review.
PO3: the same
programming and
governance arrangements
as PO2.
SO-B – Reduce
lab-to-fab
bottlenecks and
improve access to
shared
industrialisation
infrastructures –
PM2–PM6
Greater scientific and
technological critical mass;
accelerated progress from
research and technology
development to
industrialisation; improved
cross-border access to and
use of specialised
capabilities.
Premature technology
choices; under-
utilisation of facilities;
geographical
concentration;
opportunity costs if
resources are
concentrated on
unsuccessful pathways.
PO1: voluntary research
cooperation, mapping and
access to information.
PO2: S&T Excellence
Network, Grand
Challenges, Hubs,
Strategic Quantum
Infrastructuress, Strategic
Projects and Acceleration
Centres. PO3: same as
PO2.
SO-C – Improve Improved investment Risk of crowding out PO1: investment-
100
scale-up
conditions
through de-
risking and
financing
continuity –
PM5.2, PM10,
PM12
readiness and continuity of
financing (from grants to
private investment and
later-stage finance);
stronger co-investment
opportunities between
Union and national
financial actors and private
investors; enhanced
capacity to scale strategic
firms and capabilities in
Europe.
private finance; public
financial exposure to
technological failure;
selection and
concentration risks;
effectiveness depending
on investor
participation.
readiness support and
referral mechanisms.
PO2: structured financing
pipeline and coordination
through existing or future
instruments.
PO3: adds dedicated
mandate or risk-bearing
financial capacity.
SO-D–
Strengthen
demand pull and
support pathways
to first buyers
and wider
deployment –
PM5.1, PM6,
PM7, PM12
Stronger buyer–supplier
linkages; more coordinated
innovation procurement;
operational validation and
reference deployments;
progression from pilots
towards repeat
procurement and broader
market demand.
Buyer preparation and
procurement costs; risk
of purchasing immature
solutions or creating
technological lock-in.
Under PO3, sourcing or
eligibility conditions
could reduce the pool of
available suppliers and
raise procurement costs
where market
alternatives are limited.
PO1: voluntary buyer
groups, market
consultations and
guidance.
PO2: coordinated
PCP/PPI and reference
deployments based on
common use cases and
functional specifications.
Targeted sourcing or
eligibility conditions in
predefined strategic
procurements where
objectively justified.
PO3: PO2 plus
application of stronger
and/or common
conditions to predefined
strategic procurement
categories.
SO-E – Improve
targeted skills
and user support
for deployment –
PM6, PM9,
supported by
PM3–PM5 and
PM7
Greater availability and
mobility of engineering,
software, technical,
operational and user-side
capabilities; more practical
training linked to projects
and infrastructures;
improved capacity among
users to identify, assess
and adopt quantum
solutions.
Increased training and
coordination costs;
existing skills shortages
may persist despite
intervention; benefits
may concentrate in
already strong
ecosystems unless
access and mobility
measures are effective.
PO1: mapping of skills
needs and exchange of
information on training
opportunities.
PO2: targeted training,
mobility and user support
measures linked to
infrastructures, projects
and procurement.
PO3: same as PO2.
SO-F – Improve
trusted and
quantum-safe
deployment
through
standards,
benchmarking,
testing and
implementation
support – PM8,
PM13, supported
by PM7
Greater comparability of
performance; improved
interoperability between
quantum components,
systems and interfaces;
lower testing and due-
diligence costs; greater
buyer confidence; better
coordinated
implementation of the
existing PQC roadmap.
Premature
standardisation or
assurance requirements
could create technology
lock-in and limit
flexibility in a rapidly
evolving field; testing
and compliance costs
could impose additional
burdens; risk of
duplication with existing
cybersecurity
frameworks if poorly
coordinated.
PO1: voluntary pre-
standardisation and
benchmarking support.
PO2: structured
standards, benchmarking
and testing, and
cooperation on
implementation of the
PQC roadmap, a biennial
preparedness assessment,
coordinated exercises and
PQC requirements in
public procurement.
PO3: PO2 plus binding
implementation of the
existing PQC roadmap
through time-bound
migration requirements.
SO-G – Improve
visibility, early
Improved visibility of
critical dependencies and
Information and
administrative burdens
PO1: based on public and
voluntary information.
101
warning and
mitigation of
critical
dependencies –
PM11, PM14,
supported by
PM5.2, PM7 and
PM10
supply-chain chokepoints;
earlier warning of
emerging risks and
vulnerabilities; improved
supplier diversification and
qualification of alternative
sources; strengthened
connection between
identified risks to finance,
procurement and trusted
international partnerships.
for companies and
public authorities;
confidentiality and
trade-secret concerns;
over-classification of
ordinary dependencies
as critical; nor carefully
targeted measures could
restrict beneficial
supplier choice,
investment or
cooperation.
PO2: risk-based mapping,
proportionate targeted
information requests and
referral of identified risks
to existing mitigation
instruments.
PO3: wider targeted
mandatory information
requests for predefined
critical value-chain
categories.
Table 8.3. Overview of principal expected effects by intervention dimension8
46. DETAILED IMPACTS BY POLICY MEASURE
Measure Drivers and
objectives
Main benefits Main costs and
risks
Safeguards Option
conclusion
PM1 –
Common
programming
framework
PD1; SO-A Improves
common review,
priority
alignment and
visibility of
implementation
gaps
Commission
and Member
State staff time;
risk of duplicate
governance
Separate
strategic
review from
operational
decisions;
common
calendar and
templates
PO2 materially
improves
coverage; PO3
adds certainty but
higher burden and
centralisation risk
PM2 –
Quantum
Science and
Technology
(S&T)
Excellence
Network
PD1 and PD3;
SO-A, SO-B
and SO-E
Strengthens
scientific
cooperation,
critical mass,
mobility and
links to later
stages
Coordination
and
participation
costs; risk of
concentration
Open
excellence
criteria,
distributed
participation
and periodic
review
Positive under all
options; stronger
institutional
continuity under
PO2/PO3
PM3 –
Quantum
Grand
Challenges
PD1, PD2 and
PD3; SO-A,
SO-B and
SO-E
Focuses
resources on
shared
bottlenecks and
creates
measurable
progression
Programme
administration
and risk of
premature
technology
selection
Technology
neutrality,
staged
competition,
independent
review and stop
rules
PO1 is limited to
voluntary
challenge
mapping;
meaningful
additionality
arises under PO2;
PO3 uses the
same design as
PO2. no material
extra design
benefit under PO3
PM4 –
Technology
and Innovation
Hubs
PD2; SO-B Reduces search
and access
barriers and
improves use of
shared facilities
Marginal
service and
adaptation
resources; risk
of low
utilisation or
duplication
Existing
capacity first,
demand
assessment,
transparent
access and
utilisation
review
PO2/PO3 central
case uses the same
existing-
infrastructure
profile
8 The PM references identify the principal causal pathway and are not mutually exclusive. Territorial,
environmental, fundamental-rights, administrative and implementation impacts cut across several measures
and are assessed in Sections 6.4–6.5 of the Impact Assessment.
102
PM5 –
Strategic
Quantum
Infrastructures
s and Strategic
Quantum
Projects
PD1–PD5 and
PD7; SO-A–
SO-D and SO-
G
Improves
coordination,
visibility,
milestones and
access to
relevant support
pathways
Application,
review and
monitoring
costs; risk of
automatic
advantage or
concentration
Transparent
criteria,
reasoned
decisions,
review and no
automatic
entitlement
PO2 balances
visibility and
safeguards; PO3
stronger
rights/obligations
increase lock-in
and rights risks
PM6 –
Competence
and
Acceleration
Centres
PD2, PD3 and
PD5; SO-B,
SO-D and SO-
E
Helps firms and
users identify
use cases,
facilities,
finance, skills
and suppliers
Operating costs
and possible
proliferation of
centres
Reuse suitable
existing
structures;
common
minimum
services and
performance
indicators
PO2/PO3
improve
coverage; effects
depend on service
quality and
demand
PM7 –
Innovation
Procurement
PD5 and PD6;
SO-D and SO-
F
Creates early
demand,
reference
customers,
feedback and
potential follow-
on revenue
Buyer costs,
possible price
premiums,
reduced
competition and
lock-in
Functional
specifications,
staged
PCP/PPI,
multiple
suppliers and
market analysis
PO2 targeted use
is proportionate;
PO3 broader
restrictions
materially
increase risk
PM8 –
Standards,
benchmarking
and assurance
PD6; SO-F Improves
comparability,
interoperability,
testing and
trusted
deployment
Standards
participation
and testing
costs; risk of
premature lock-
in
Maturity
triggers,
technology
neutrality,
shared testing
and periodic
review
PO2 voluntary
approach is
proportionate;
PO3 uses the
same measure
variant as PO2
(PM8b)
PM9 – Skills
and mobility
PD3; SO-E Improves
deployment-
linked
engineering,
software,
procurement,
operational and
user capabilities
Programme and
participation
costs; possible
duplication of
education
initiatives
Use existing
programmes,
employer and
user evidence,
and targeted
profiles
PO3 planning
obligations do not
by themselves
increase talent
supply
PM10 –
Quantum
Investment
Service Desk
PD4; SO-C Improves
investment
readiness,
referrals,
syndication and
continuity
between support
stages
Public-budget
exposure,
crowding out
and
concentration
risk
Independent
investment
decisions,
additionality
tests and
private risk-
sharing
PO2 uses the
Quantum
Investment
Service Desk
through existing
or future
instruments.
PO3’s dedicated
mandate or
capacity within
existing or future
financial
instruments’
envelope
increases
budgetary,
governance and
additionality risks
but does not
require a new
institution.
103
PM11 –
Strategic
intelligence
and
dependency
monitoring
PD7 and PD1;
SO-G and SO-
A
Improves
visibility of
dependencies,
bottlenecks and
mitigation needs
Information
burden and
confidentiality
or security risks
Risk-based
scope, data
minimisation,
secure
handling,
thresholds and
once-only
reuse
PO2 scoped
mapping is
proportionate;
PO3 broader
reporting
increases
coverage and
burden
PM12 –
Quantum
Business
Platform
PD4 and PD5;
SO-C and SO-
D
Supports
matchmaking
among firms,
users, investors
and partners
Platform
operation costs,
data-quality risk
and possible
market
distortion
Voluntary
participation,
neutral
governance and
separation from
regulatory
monitoring
Similar
substantive
benefits under
PO2/PO3;
dependent on
uptake
PM13 –
Quantum-safe
preparedness
PD6; SO-F Improves
implementation
support,
migration
planning,
cryptographic-
asset visibility,
progress
monitoring and
crypto-agility or
PQC-readiness.
Administrative,
adjustment and
supervisory
costs; possible
duplication with
cybersecurity
obligations;
disproportionate
fixed costs for
smaller covered
actors.
Risk-based
scope and
thresholds;
alignment with
the existing
roadmap and
sectoral
frameworks;
reuse of
existing plans
and
inventories;
proportionate
frequency;
implementation
through
existing
competent
authorities.
PO1 adds no
measure
beyond the
baseline, PO2
adds a biennial
preparedness
assessment,
coordinated
exercises, PQC
requirements in
public
procurement
and
implementatio
n-support
functions of
different
intensity. PO3
provides
greater
preparedness
coverage but is
a major cost,
burden,
feasibility and
coherence
driver.
PM14 –
Strategic
international
cooperation
PD4, PD6 and
PD7; SO-C,
SO-F and SO-
G
Supports
research,
standards,
supply
diversification,
reciprocity and
market access
Coordination
and research-
security costs;
possible
restriction of
beneficial
cooperation
Criteria-based
partnerships,
proportional
safeguards and
consistency
with
international
commitments
PO2/PO3 provide
more strategic
coordination than
PO1
PM15 –
Quantum
Strategy Board
PD1; SO-A Links Union
priorities with
structured
national inputs
and
implementation
review
Preparation and
reporting
burden; possible
reduction of
national
flexibility
National
budgets remain
national;
proportionate
chapters and
once-only data
reuse
PO2 provides
durable
coordination; PO3
has stronger
coverage but
higher burden
104
PM16 –
European
Quantum
Alliance
PD1–PD6;
SO-A–SO-F
Improves
stakeholder
intelligence,
user and
industry input
and policy
feedback
Participation
and secretariat
costs; risk of
duplicating
formal advisory
bodies or
capture by
organised
interests
Light open
interface,
balanced
representation
and routing to
competent
bodies
PO1/PO2 benefits
depend on
participation; PO3
formal
compliance
regime is less
proportionate
Table 8.4. Detailed impacts per PM
47. AFFECTED STAKEHOLDERS AND PRACTICAL IMPLICATIONS
Affected
stakeholder
Actions required or
expected
Main costs and risks Main benefits
Commission and
Union services
Operate the Board and review
cycle; maintain common
methods and intelligence
tools; coordinate Strategic
Project, infrastructure,
finance, procurement,
standards and monitoring
functions.
Staff, analytical,
governance, data-
management and
coordination resources;
risk of overlap if
institutional interfaces are
unclear.
More coherent Union
action; improved evidence;
earlier identification of
delivery gaps and
dependencies; stronger
policy learning.
Member State
authorities and
public buyers
Prepare national quantum
chapters; participate in
governance, procurement,
skills, PQC and resilience
cooperation; provide
information for the biennial
PQC preparedness
assessment, take part in
coordinated exercises and
apply PQC requirements in
public procurement; validate
proportionate national
information.
Administrative and
technical resources;
possible capacity
constraints in smaller
administrations.
Better visibility of Union
and national priorities;
opportunities for joint
action; lower duplication;
access to common evidence
and methodologies.
Implementing
bodies, Joint
Undertakings and
agencies
Administer relevant calls,
access arrangements, projects
and monitoring; assess
milestones and coordinate
with the Board and
programme authorities.
Additional programme-
management and
technical-assessment
tasks.
More coherent pathway
from R&I to infrastructure,
finance, procurement and
deployment; improved
programme additionality.
Quantum start-
ups, SMEs and
scale-ups
Voluntarily apply for
facilities, finance, projects,
procurement or user support;
provide proportionate
information where supported
or specifically covered by a
targeted request.
Application, monitoring,
testing and qualification
costs; risk of
disproportionate fixed
costs or incumbent
advantage.
Improved access to
facilities, finance,
customers and reference
deployments; lower search
costs; stronger investor and
buyer confidence.
Larger quantum
firms and system
integrators
Participate in projects,
procurement, standards,
deployment, business
matchmaking and supply-
chain cooperation.
Project, reporting and
assurance costs; possible
restrictions in defined
strategic procurements
under higher-intensity
designs.
Larger and more
predictable European
market; stronger supplier
and infrastructure base;
cross-border deployment
opportunities.
Infrastructure
operators, RTOs
and universities
Publish service catalogues;
apply common access
principles where supported;
report utilisation and
outcomes proportionately;
provide technical user
support.
Adjustment of access
processes; service,
monitoring and user-
support resources.
Higher utilisation; broader
industrial and cross-border
user base; stronger links
between research,
engineering and
deployment.
105
Component and
enabling-
technology
suppliers
Respond to targeted requests
where justified; support
alternative-supplier
qualification, diversification
or contingency planning
where relevant.
Information and
confidentiality-
management costs;
possible disproportionate
burden on small critical
suppliers.
Improved demand
visibility; support for
qualification and capacity
development; reduced
disruption exposure.
Public procurers
and user
organisations
Preparation, technical-
assessment and learning
costs; risk of purchasing
immature solutions.
Better specifications and
market intelligence; shared
procurement preparation;
access to operational
evidence and innovative
solutions.
Financial
institutions and
private investors
Participate voluntarily in
investment-readiness,
financing and cross-border
syndication activities when
relevant transactions or
projects arise. Where
participating in
implementation monitoring,
provide aggregated pipeline
and mobilisation information
through the applicable
reporting arrangements,
normally annually.
Due-diligence and
coordination resources.
Improved project pipeline;
lower information
asymmetry; opportunities
for larger cross-border
investments.
Workers,
students and
researchers
Participate voluntarily in
training, mobility, research,
engineering and deployment
activities for the duration of
the relevant programme,
project or training action.
No recurring regulatory
reporting obligation is
foreseen.
Adjustment of training
provision; possible
concentration of demand
in established clusters.
Greater mobility,
specialised training and
industrial career
opportunities.
Citizens and
society
No direct action required. No direct administrative
cost; opportunity cost of
public expenditure;
possible environmental
footprint of additional
activity.
Potential long-term
benefits from applications,
employment and
knowledge spillovers;
improved continuity and
security of digital services.
Table 8.5. Practical implications by stakeholder group
48. EXPECTED BENEFITS AND COSTS
48.0. EXPECTED BENEFITS
The preferred option is expected to generate direct process and transaction-cost savings and
wider benefits for industrial capability, investment, demand, skills, trusted deployment and
resilience. Most wider benefits cannot be monetised robustly because they depend on
technological progress, future programme resources, facility use, investor response and
buyer participation.
Benefit channel Main beneficiaries Expected benefit Quantified indicator or
scenario
Strategic
coordination
Commission,
Member States and
implementing bodies
More complete planning
and improved identification
of gaps, complementarities
and opportunities for joint
action.
Structured review and national
quantum chapters covering all
27 Member States; monetised
coordination savings included
within the EUR 13.590 million
total modelled savings.
106
Infrastructure
access
SMEs, firms,
researchers and users
Lower search and
negotiation costs and earlier
access to engineering,
testing, validation and
qualification.
Illustrative scenario: 40–240
project-months per year
brought forward if 40–120
projects obtain access one to
two months earlier.
Scale-up finance Start-ups, scale-ups
and investors
Greater financing
continuity and stronger
cross-border syndication.
Illustrative mobilisation range
of EUR 150–350 million of
private co-investment per EUR
100 million of Union risk-
bearing finance. Financing
volumes are not treated as
welfare benefits.
Demand and first
buyers
Suppliers, public
buyers and users
Early revenues, reference
customers, operational
validation and stronger
investor confidence.
Illustrative scenario per EUR
100 million of innovation
procurement: EUR 25–50
million of persistent supplier
revenue and EUR 10–20
million of additional private
investment. These are not
added to the CBA.
Standards and
assurance
Buyers, suppliers and
infrastructure
operators
More comparable
performance claims, lower
repeated due diligence and
improved interoperability
and substitutability.
Tracked through common
benchmarks, specifications,
test methods and reuse of
recognised results; no central
monetary value assigned.
Quantum-safe
preparedness
Member States,
public authorities and
critical-system
operators
Improved access to
technical advice,
implementation experience
and good practices.
Preparedness assessments,
exercises, procurement
requirements, advisory outputs
and monitoring coordination.
Under PO2, the quantified
outputs concern the biennial
preparedness assessment,
coordinated exercises, PQC
requirements in public
procurement, technical advice,
implementation support and
monitoring coordination. The
PO3-specific binding
preparedness duties are costed
in Annex 4 and assessed under
PM13 in Table 8.4 and are not
attributed to the preferred
option.
Supply-chain
resilience
Projects, suppliers,
authorities and users
Earlier identification of
dependencies and support
for diversification and
alternative-supplier
qualification.
Illustrative sensitivity: 19–57
days saved per affected project
if 10–30% of delays
comparable to documented
cases are avoided.
Skills and user
capability
Workers, students,
firms and public users
Training and mobility better
linked to infrastructures,
projects, procurement and
deployment.
Participation, completion,
vacancy-fill, mobility and
user-capability indicators; no
robust employment total is
forecast.
Administrative
simplification
Authorities,
applicants and
beneficiaries
Common taxonomies,
templates, digital processes
and once-only information
reuse.
EUR 13.590 million of
modelled savings under PO2:
EUR 6.860 million for
Member State authorities,
EUR 6.450 million for
businesses and EUR 0.27
million for implementing
bodies.
Table 8.6. Overview of principal benefits of PO2
107
The quantified outcome scenarios use different units and assumptions and are not forecasts.
They must not be aggregated into a single benefit figure. Detailed assumptions, causal
pathways and sensitivity treatment are presented in Annex 4.
48.1. OVERVIEW OF COSTS OF THE RETAINED OPTIONS
The Standard Cost Model covers the incremental administrative, adjustment, coordination,
monitoring and implementation resources generated by the framework. It excludes the
substantive value of grants, procurement contracts, financial instruments and capital
commitments, which are transfers or financing volumes rather than automatically societal
costs.
Central NPV, EUR million, 2028–2037 PO1 PO2 PO3
Core policy machinery 41.44 84.5184.51 142.1515
Incremental Hub/Centre resources 0.00 21.41 21.41
Total societal cost 41.44 105.92 163.56
Modelled monetised savings 5.39 13.59 14.04
Net modelled cost 36.05 92.3492.34 149.5252
Partial benefit-cost ratio 0.13 0.13 0.09
Table 8.7. Modelled societal costs and modelled savings by option
The partial benefit-cost ratio is not a complete welfare benefit-cost ratio. It compares total
societal cost only with the limited set of time and resource savings that could be monetised
with a sufficiently explicit causal mechanism. It excludes most expected benefits relating to
industrial capacity, innovation, infrastructure services, private investment, employment,
interoperability, resilience and security.
PO2 costs approximately EUR 64.49 million more than PO1, while PO3 costs
approximately EUR 57.63 million more than PO2. PO3 is therefore around 54% more costly
than PO2 in the central case.
48.2. DISTRIBUTION OF COSTS
Approximately 6565.05.% of PO2 societal costs fall on Commission or Union services and
Member State authorities. Including implementing bodies, existing Hub/Centre operators
and Commission-financed external experts, approximately 91.77% falls on the public and
implementation side. Business-facing costs are concentrated on applicants, beneficiaries,
designated Strategic Projects, and actors subject to specifically defined information
obligations; they do not apply to the general business population.
48.3. PUBLIC-BUDGET IMPLICATIONS AND FINANCING VOLUMES
Budgetary results are reported separately from societal resource cost. The Layer 2 is the
administrative and implementation expenditure of the Commission Commissionand the
Member States, costed at resource rates (PO2: EUR 90.28 million NPV, of which EUR
21.41 million for the hub and Centre module; Annex 4, Table 4.25); because it includes
Member State costs, it is not a Union-budget figure. Programme envelopes and transfers are
memorandum items and must not be added to societal cost figures). Layer 2 is reported only
as total budget outflow with the transfer caveat.
Possible program expenditure under PO2 are detailed in Table 4.35 on Annex 4. The amount
depends on future Union and national budgetary decisions, including the next Multiannual
Financial Framework. The Regulation would not create an automatic funding entitlement
for a project, facility or company.
Annex 4 presents a bottom-up planning range for PO2 of EUR 5.19–6.12 billion in
indicative Union programme resources, corresponding to approximately EUR 12.90–18.08
billion in total direct programme resources. Separately, broader sector financing needs are
estimated at around EUR 50–60 billion, mainly equity; up to EUR 2–4 billion for start-ups,
up to EUR 20–25 billion for scale-ups and EUR 25–30 billion for large strategic projects
108
and foundries. These are ceilings on a financing need, not committed or mobilised finance.
These are reported separately from the programme-resource, societal-cost and
administrative-cost estimates.
48.4. ONE-IN, ONE-OUT AND SIMPLIFICATION
For the administrative-burden component of the One-In, One-Out (OIOO) approach,
administrative burden comprises the incremental cost of administrative activities undertaken
solely because of legal obligations, net of business-as-usual costs. Documentation for
investment support, time that firms choose to spend in the new structures without a legal
requirement, programme expenditure and public-administration resources are excluded
from that component, while adjustment costs are identified separately as the second leg of
OIOO. As the initiative does not remove existing obligations that qualify as administrative
offsets, its net administrative-burden position equals the new administrative burden, which
arises only from conditions attached to Union funding, designation and supported
procurement, from the requirements for taking part in regulatory sandboxes and the business
platform, and from targeted information requests.9
OIOO indicator PO1 PO2 PO3
One-off business administrative burden, nominal EUR 0 EUR 0.296m EUR 2.960m
Recurrent business administrative burden, steady-
state peak per year
EUR 0 EUR 0.719m EUR 1.994m
Business administrative burden, NPV EUR 0 EUR 5.46m EUR 16.28m
Equivalent annual business administrative burden EUR 0/year EUR
0.621m/year
EUR 1.853m/year
Existing obligations removed as administrative
offsets
EUR 0 EUR 0 EUR 0
Net OIOO administrative-burden position EUR 0 EUR 5.46m
NPV
EUR 16.28m
NPV
Business adjustment costs reported separately EUR 0 EUR 0 EUR 7.20m NPV
Citizens: new or removed administrative burden EUR 0 EUR 0 EUR 0
Table 8.8. Application of the One-In, One-Out approach
49. OVERVIEW OF IMPLICATIONS AND IMPACTS
This section overviews the main implications of the preferred option, as well as the expected
impacts regarding economic, environment, territorial, social and fundamental rights aspects.
49.0. BROADER IMPACTS OF QUANTUM TECHNOLOGIES
Before comparing the policy options, it is necessary to distinguish between the broader
potential of quantum technologies and the incremental effects of the initiative.
Quantum computing and simulation can support advances in materials, pharmaceuticals,
finance, energy, manufacturing, logistics and other optimisation-intensive activities by
offering practical advantages over classical alternatives. Quantum sensing and metrology
can improve health diagnostics, navigation, timing, geophysical exploration (e.g. gravity
and magnetic field detection, deep earth exploration) and environmental and infrastructure
monitoring (e.g. detecting subsidence or changes in underground structures, drought
monitoring and water management)5. Quantum communications may enhance security in
certain use cases. PQC, designed to resist both quantum and classical attacks, will allow the
continued secure operation of digital services, critical infrastructures and public
administration35.
These developments could improve productivity, innovation, resilience and preparedness,
9 European Commission, Better Regulation Toolbox, December 2025, Tools #56, #58 and #59, especially pp.
507-512 and 526-543; Jacopo Torriti, 'Standard Cost Model: Three Different Paths and their Common
Problems', Journal of Contemporary European Research 8(1) (2012), pp. 90-108.
109
public-services, health, security and the environment10. Quantum computing and AI may
also reinforce each other: machine learning already supports quantum-system control, error
mitigation, circuit design and simulation, while future hybrid quantum-classical
supercomputers may support selected AI applications11. However, practical quantum
advantage for AI applications remains unproven and is therefore not included in the
quantified impacts.
However, impacts remain application-specific and uncertain, depending on technological
performance, cost, scalability, user adoption and demonstrated advantages over classical
alternatives. Quantum technologies may also pose risks, such as threats to existing
cryptography, surveillance and dual-use applications, the concentration of strategic
capabilities that may destabilise the economy and society, considerable energy, material and
waste footprint of specialised infrastructures and shortages in the skilled workforce needed
for the functioning of such technologies. The main security risk is the compromise of public-
key cryptography, which requires asset inventories, risk-based planning, crypto-agility and
coordinated upgrades. PQC is the primary response, with QKD complementing it in limited
high security cases12.
The policy options would not produce these broader effects directly, but could influence
their probability, timing, scale and the EU’s share of benefits by improving research to
deployment continuity, access to engineering and testing capabilities, financing, demand,
skills, standards and supply-chain resilience. PO1 would primarily support progress, through
voluntary participation. PO2 would create a targeted pathway from scientific excellence to
industrialisation and deployment. PO3 could strengthen strategic effects via intensive
planning, finance, procurement and dependency monitoring, but would offer little additional
benefit over PO2 and may introduce higher administrative burden, market and
technological-lock-in risks. Thus, the broader potential of quantum technologies alone
cannot justify the most intensive policy option.
49.1. ECONOMIC IMPACTS
Competitiveness and innovation. PO1 provides low-cost coordination but leaves important
delivery gaps. PO2 improves continuity from research to testing, industrialisation and
deployment through Grand Challenges, shared infrastructure, Strategic Projects, finance and
procurement pathways. PO3 offers the strongest formal coverage but creates higher cost,
market-access and technology-lock-in risks. PO2 provides the most favourable overall
competitiveness balance.
SMEs and start-ups. PO2 should improve access to facilities, finance, users, first buyers
and common testing. Its business/private-actor costs are EUR 8.83 million NPV, including
EUR 5.50 million of administrative costs (EUR 5.46 million within One-In, One-Out); the
balance (EUR 3.33 million) is time that firms choose to spend in the new structures without
a legal requirement. Modelled business-side savings are EUR 6.4545 million NPV. No
business adjustment costs are modelled under PO2.
Finance and investment. The Quantum Investment Service Desk may improve investment
readiness, access to financing and coordination among public and private financing actors.
Effects depend on additionality and private participation. PO3's dedicated financing
mandate or capacity would entail higher budgetary and governance requirements and
potential risks of crowding out existing instruments.
10 GESDA and OQI, Intelligence Report on Quantum Diplomacy in Action 2025–2026, 2025, p.5. 11 Alexeev, Y., Farag, M.H., Patti, T.L. et al. Artificial intelligence for quantum computing. Nat Commun 16,
10829 (2025). 12 GESDA and OQI, Intelligence Report, pp. 28-31.
110
Demand and market formation. Buyer coordination, PCP/PPI and reference deployments
may accelerate customer validation and follow-on demand. The effect is uncertain because
technology maturity, procurement pipelines and supplier availability differ by domain.
Broader preferences under PO3 may increase prices or exclude suitable products.
Internal market and competition. PO2 principally uses common information, access and
support pathways and creates only targeted conditions. PO3 creates greater risks of market
fragmentation, reduced competition and barriers to cross-border or international
participation. Strategic Project designation must not create an automatic market advantage.
Resilience and economic security. PM11 and PM14 improve visibility, early warning,
supplier qualification and diversification. Avoided disruption effects remain difficult to
monetise. Measures must preserve beneficial international trade and investment and avoid
treating the entire sector as restricted.
Lastly, the initiative is particularly relevant for SMEs and start-ups, which constitute the
large majority of the European core quantum-company population mapped for this impact
assessment. Enabling-component SMEs and SMEs seeking to adopt quantum solutions form
additional affected groups. This SME focus is especially important because capital,
advanced infrastructure and specialised talent are increasingly concentrated among a limited
number of highly capitalised firms. The detailed SME Test is presented in Annex 6.13 14
49.2. DISTRIBUTIONAL, TERRITORIAL AND SOCIAL IMPLICATIONS
These impacts would mainly relate to employment and skills, access to expertise and
infrastructure, participation in the quantum sector and the wider uptake of quantum
technologies. They are expected to emerge progressively and unevenly across technologies
and regions.
Quantum industrialisation could increase demand for highly qualified scientific,
engineering, technical, software, cybersecurity, procurement and interdisciplinary
professional profiles. This may, however, intensify existing skills shortages and recruitment
bottlenecks in these areas, particularly where specialised expertise remains scarce. Quantum
applications, often combined with AI, will support public services in areas such as health
diagnostics, designing better medicines or discovering new drugs, navigation and timing,
infrastructure and environmental monitoring and secure communications. However, these
benefits remain uncertain, as they depend on depend on affordability, successful deployment
and demonstrated performance advantages over classical alternatives. These potential
benefits should therefore not be attributed solely to the initiative.
Impact PO1 PO2 PO3
Skills and
employment
Limited enabling
effect
Training and user
support linked to
delivery measures
Potentially broader effects,
dependent on greater
expenditure
Participation and
territorial access
Better information
and voluntary
outreach
Distributed user support
linked to specialised
cross-border facilities
Wider capacity, but greater
risk of concentration or
duplication
Application-level
benefits
Possible but highly
uncertain
Greater scope for
validated applications
Potentially wider deployment;
benefits not assumed ex ante
13 McKinsey & Company (2026), Quantum Technology Monitor 2026: A commercial tipping point, 2026.
especially pp. 27, 34-40 and 63. The statement on the SME share is based on the company mapping
underpinning this impact assessment; McKinsey is cited for the external evidence on investment concentration,
infrastructure and talent. 14 Oliver Mallett, Robert Wapshott and Tim Vorley, 'How Do Regulations Affect SMEs? A Review of the
Qualitative Evidence and a Research Agenda', International Journal of Management Reviews 21(3) (2019),
pp. 294-316. The review identifies threshold effects, perceived burden, and regulatory stability and consistency
as key dimensions of SME impacts.
111
Table 8.9. Social, and territorial impacts
Employment effects cannot be estimated robustly before programme budgets, project
selection and technology demand are known. Monitoring should therefore focus on
participants, placements, vacancy indicators, firm growth and user capability rather than an
unsupported aggregate job forecast.
Europe has around 40 specialised quantum-technology or quantum-engineering master’s
programmes, but expected graduate output remains below anticipated industrial needs.
These findings support targeted training, mobility and user-capability measures, but do not
justify forecasting net employment creation.
Lastly, territorial effects would depend on the location of specialised facilities and the
practical accessibility of their services. The PPMI/d-fine study mapping identified 91
testbeds and 27 pilot lines, but only 18 testbeds and 8 pilot lines were identified as open to
start-ups68. While coverage is incomplete, this illustrates the limited visibility and uneven
accessibility of existing facilities rather than an overall shortage of capacity.
In consequence, PO1 would improve information on existing capabilities but would not
materially change their geographical accessibility. PO2 would combine first-level user
support, aiming at one access point per Member State with specialised capability-based
Hubs serving users across borders. PO3 would retain the same territorial architecture.
49.3. ENVIRONMENTAL IMPLICATIONS
Environmental effects15 may arise directly from the production, operation and end-of-life
treatment of quantum hardware and related facilities, and indirectly, through downstream
applications that may support or undermine sustainability objectives. Overall, quantum
technologies could deliver environmental benefits through scientific discovery, modelling,
sensing and optimisation relevant to the green transition, including advances in materials
and energy technologies, optimisation of logistics and energy systems, climate modelling
and more precise environmental and infrastructure sensing16.
Quantum computing could require substantially less electrical power than today’s
most powerful classical supercomputers. Leading exascale supercomputers consume tens
of megawatts, while many quantum-computing platforms, especially the most energy-
efficient architectures, are expected to operate with system-level power requirements two to
three orders of magnitude lower. This potentially substantial reduction in power demand
could lower operating costs and ease pressure on electricity infrastructure as quantum
computing scales.
Energy efficiency may also become a key competitiveness and scalability factor for quantum
systems. According to input from QuIC17 and the Quantum Energy Initiative18, energy use
should be evaluated at the full-system level encompassing the entire hardware and software
15 The environmental assessment examines the additional footprint linked to the capacity supported by the
forthcoming legislative intervention, including cases where quantum capabilities are integrated into HPC/AI
infrastructure. It does not attribute the overall energy footprint of AI/datacentres to the forthcoming legislation. 16 Root, D., Quantum Technologies in the Context of Climate Change: Emphasizing Sustainability in a
Responsible Innovation Approach to Quantum Innovation, NanoEthics, Vol. 19 (2025); Auffèves, A.,
Quantum Technologies Need a Quantum Energy Initiative, PRX Quantum, Vol. 3 (2022); kiutra and
CIRCULAR REPUBLIC, Circularity in the Quantum Industry: Securing Our Quantum Future Through
Circular Economy Strategies, white paper (2026). 17 The European Quantum Industry Consortium (QuIC) is an industry-led association that unites European
businesses, research centres, and startups to foster a competitive commercial ecosystem for quantum
technologies. 18 The Quantum Energy Initiative is a global consortium of scientists and industry experts focused on
understanding, optimizing, and reducing the environmental footprint and energy consumption of quantum
computing and technologies.
112
stack and supporting classical computing. The initiative recommends developing
comparable energy and power metrics for R&I, infrastructure and procurement. Such
benchmarks could help identify architectures and applications that deliver practical
performance with lower operating costs and reduced energy infrastructure demands.
However, any claimed quantum energy advantage should be demonstrated for the specific
application against the best classical alternative and should not be assumed in advance19.
Shared facilities and cross-border access could also improve resource utilisation and
efficiency by avoiding duplication. By contrast, supporting under-used facilities would
impose environmental costs without matching industrial or societal benefits. Expected
demand and utilisation should therefore inform project selection and periodic review.
Potential negative impacts include increased demand for energy-intensive infrastructure,
pressure on scarce materials and additional electronic and industrial waste. Relevant
facilities and projects should monitor, where proportionate, energy use and greenhouse-gas
emissions, cooling and water needs, specialist-gas and material use, utilisation, and
equipment end-of-life.
PO2 may increase operational energy, cooling-related resource use, consumables and
equipment-related impacts where it induces additional services, equipment or infrastructure
adaptation. Available life-cycle evidence shows that results depend on hardware
architecture, operating time, error-correction overhead and the electronic components
required for a functionally equivalent workload. Infrastructure operators and supported
projects should therefore monitor operational energy, cooling, consumables, equipment
lifetime, utilisation and relevant embodied impacts per validated workload, where
proportionate20;21.
Reuse, remote access and federation of existing facilities may avoid unnecessary duplication
and improve utilisation, while cloud access can permit experimentation without each user
acquiring dedicated on-site hardware. Conversely, under-used or prematurely constructed
capacity would increase environmental and budgetary costs without corresponding benefits.
The central model therefore assumes reuse of existing infrastructure and treats a full-build
configuration only as a stress test20;22.
Potential environmental benefits from quantum applications, including in net-zero power-
system optimisation, are not counted ex ante unless demonstrated against the best available
classical alternative using a functionally equivalent workload. The comparison should
include hybrid processing, sampling, error-correction and relevant infrastructure overheads,
since peer-reviewed evidence indicates that any environmental or energy-efficiency
advantage is workload-specific and conditional on hardware and algorithmic
performance20;23.
19 QuIC and Quantum Energy Initiative, The EU quantum energetic strategic advantage, 17 October 2025;
Fellous-Asiani et al., The energetic challenges of fault-tolerant quantum computing, 29 June 2026. 20 Sylvain Cordier, Karl Thibault, Marie-Luc Arpin and Ben Amor, 'Scaling up to problem sizes: an
environmental life cycle assessment of quantum computing', Quantum Science and Technology 10(2) 025058
(2025). The central-model infrastructure assumptions stated in the paragraph remain internal model
assumptions. 21 European Commission, Better Regulation Toolbox, December 2025, Tool #66. 22 McKinsey & Company (2026), Quantum Technology Monitor 2026: A commercial tipping point, 2026, p.
79.; 23 Daniel Jaschke and Simone Montangero, 'Is quantum computing green? An estimate for an energy-efficiency
quantum advantage', Quantum Science and Technology 8(2) (2023), 025001; Thomas Morstyn and Xiangyue
Wang, 'Opportunities for quantum computing within net-zero power system optimization', Joule 8(6) (2024),
pp. 1619-1640.
113
49.4. FUNDAMENTAL RIGHTS AND SUSTAINABLE DEVELOPMENT GOALS
IMPLICATIONS
Measure Right or interest affected Required safeguards
Information requests and
reporting
Data protection, trade secrets and
freedom to conduct a business
Defined purpose and population,
necessity, minimisation, confidentiality,
once-only reuse and review rights
Project designation,
access and support
Equal treatment, property
interests and freedom to conduct
a business
Transparent criteria, reasoned decisions,
right to be heard, review and withdrawal
procedures
Procurement and
eligibility conditions
Equal treatment, market access
and business freedom
Prior market analysis, proportionality,
availability tests and transparent
exceptions
Standards and assurance Technological neutrality and
compliance costs
Maturity triggers, phased application,
defined scope and periodic review
Security-sensitive
participation conditions
Academic freedom, openness of
research and international
cooperation
Risk-based assessment and distinction
between open research and sensitive
deployment
Table 8.10. Fundamental-rights and procedural safeguards.
Sustainable Development Goal Expected contribution Qualification
SDG 4 – Quality education Skills, training, mobility and user-
capability measures.
Positive direction, dependent on
program resources and
participation.
SDG 8 – Decent work and
economic growth
Support for firm growth,
investment, deployment and
specialized employment.
Positive direction; no aggregate
employment forecast.
SDG 9 – Industry, innovation
and infrastructure
Improved research-to-deployment
pathways, shared infrastructure,
finance and procurement.
Principal expected positive
contribution.
SDG 12 – Responsible
consumption and production
Shared facilities and supplier
qualification may improve
utilization and equipment
longevity.
Mixed; additional activity may
also use energy, water, materials
and specialist gases.
SDG 13 – Climate action Future quantum applications may
support energy, materials and
climate analysis.
Potential benefit not counted
without application-level
evidence.
SDG 16 – Peace, justice and
strong institutions
More resilient and quantum-safe
public and critical systems;
transparent governance and
safeguards.
Positive, subject to effective
implementation and protection
of confidential information.
SDG 17 – Partnerships for the
goals
EU–Member State cooperation,
cross-border projects and trusted
international partnerships.
Positive.
Table 8.11. Contribution to relevant Sustainable Development Goals
50. TRADE OFF AND SYNERGIES
Issue Synergies Trade-offs
Coordination
and investment
Better alignment of R&I, infrastructure,
finance and procurement can strengthen
overall effectiveness and support more
coherent investment decisions.
Stronger steering may reduce
flexibility and may limit the ability of
actors to respond to emerging needs or
technological developments
114
Infrastructure
and access
Shared facilities can widen access,
improve utilisation rates and support more
efficient use of resources.
Concentration may reinforce existing
clusters; geographical dispersal may
duplicate capacity and reduce
efficiency
Finance and
demand
Lead customers and procurement revenues
can facilitate investment by improving
market visibility and reducing uncertainty.
Public support may crowd out private
finance or favour technologies that
remain sufficiently immature
Procurement
and resilience
Procurement can create early demand,
accelerate market formation and supports
security of supply.
It may increase prices and reduce
supplier choice particularly where
competition is limited.
Standards and
assurance
Common standards and assurance
mechanisms can improve comparability,
interoperability and trust.
Requirements introduced too early
may create technological lock-in and
constrain innovation.
Skills and
deployment
Projects and facilities can provide practical
training opportunities and help develop the
skills base industry needs.
In the short term, increased demand
may intensify existing talent shortages
Dependencies
and openness
Measures can support diversification and
trusted partnerships, thereby strengthening
resilience.
Reporting requirements or restrictions
may impose additional burdens on
firms and reduce beneficial
international cooperation.
Table 8.12. Trade-offs and synergies breakdown
51. UNCERTAINTY AND DATA LIMITATIONS
The estimates remain sensitive to the final legal drafting, the number and configuration of
supported activities, Member State and stakeholder participation, future programme
resources, the frequency and scope of information requests, technological maturity, private-
investor and buyer response, and the extent to which existing data and administrative
systems can be reused.
Low, central and high assumptions and deterministic sensitivity analysis are used to test the
monetary results. These ranges are not statistical confidence intervals. A probabilistic
analysis of the same ranges (Annex 4, Table 4.30) shows that, because the ranges are skewed
upwards, most sampled outcomes lie above the central estimates; since the ranges are
judgement bands rather than calibrated probabilities, this describes the spread of the
assumptions rather than a likelihood of cost overrun. The dispersion is concentrated in the
marginal service and adaptation assumptions and, for PO3, in the population subject to the
quantum-safe preparedness duties. They represent alternative implementation and cost
conditions. The central infrastructure case assumes reuse of existing facilities; separate low,
high and full-build stress cases test the effect of different marginal service and adaptation
assumptions.
Uncertainty Impacts affected Treatment
Technology maturity
and timing
Industrialisation, procurement,
standards and quantum-safe
deployment
Maturity scenarios; qualitative assessment
where timing cannot be forecast
Future programme
resources
Hubs, projects, finance,
procurement, employment and
territorial impacts
Programme expenditure reported
separately; implementation conditional on
future legal and budgetary decisions
Participation and
utilisation
Coordination, Centres, facilities
and voluntary activities
Low, central and high take-up and
utilisation assumptions
Private-investment
mobilisation
Scale-up finance and firm
growth
Illustrative ranges rather than point
forecasts
Procurement pipeline
and price premium
Demand, supplier revenue and
public cost
Alternative pipeline, affected share and
premium assumptions
115
Avoided disruption and
security losses
Resilience and quantum-safe
preparedness
Low-confidence scenarios; not included in
the central ranking
Administrative and
implementation costs
Efficiency and burden
distribution
Alternative populations, frequencies, time
requirements and unit costs
Strength of the baseline Additionality of all options Stronger- and weaker-baseline scenarios
Table 8.13. Principal uncertainties and analytical treatment
Specific objective PO1 PO2 PO3
SO-A – Coordination and delivery + ++ +++
SO-B – Lab-to-fab and infrastructure access + ++ +++
SO-C – Scale-up finance + ++ +++
SO-D – Demand and first buyers + ++ ++
SO-E – Skills and user support + ++ ++
SO-F – Trusted and quantum-safe deployment + ++ +++
SO-G – Dependencies and resilience + ++ +++
Table 8.14. Relative effectiveness by specific objective. + limited; ++ substantial; +++ highest formal
coverage
Option Weighted score Rank
PO1 3.000 3
PO2 3.438 1
PO3 3.188 2
Table 8.15. Central multi-criteria results
(The MCDA results are described in more details in Table 4.32 and Table 4.33)
PO2 ranks first under the balanced central weighting. PO3 may rank first where substantially
greater weight is placed on resilience and formal coverage. PO1 ranks best on partial
monetized cost because it is the least intensive option, but it does not address all residual
gaps. The preferred option therefore reflects a balanced judgement across effectiveness,
efficiency, coherence, proportionality, feasibility and uncertainty.
Wider impact Potential benefits and risks Relevance for the option
assessment
Impacts on S&T
excellence,
innovation and
industrial
competitiveness
Benefits: Technology maturation, new products,
firm growth and stronger EU value chains.
Risks: premature concentration; and, ineffective
expenditure.
PO1 improves coordination.
PO2 creates a connected
research-to-deployment
pathway.
PO3 strengthens selected
finance and procurement
measures but does not
automatically generate greater
benefits.
Societal,
employment and
public services
impacts
Benefits: Potential improvements in health,
navigation, monitoring, secure services and high-
skilled employment. Risks: unequal access to
emerging high-skilled employment opportunities;
geographical concentration of jobs and expertise
in already strong quantum ecosystems; and
persistent shortages of specialised skills. unequal
access; concentration and skills shortages.
PO1 improves awareness.
PO2 links skills, user support
and deployment. PO3 retains the
same skills and user-support
arrangements as PO2; additional
effects would be indirect.
116
Security,
resilience and
fundamental
rights impacts
Benefits: PQC and secure communications could
strengthen cybersecurity and improve resilience
against future quantum-enabled threats.
Risks: Sensing and dual-use applications may
give rise to privacy risks, misuse and broader
security concerns. Other risks include
compliance burdens, administrative costs and
potential risks rights and freedoms, depending
on implementation.
The PQC transition is mainly
part of the baseline. PO1 adds no
PQC-specific measure beyond
that baseline. PO2 adds a
biennial preparedness
assessment, coordinated
exercises, PQC requirements in
public procurement and
structured QSB–NIS
Cooperation Group cooperation.
PO3: PO2 structured PQC
cooperation supplemented by
binding implementation of the
existing PQC roadmap through
time-bound migration
requirements.
Environmental,
energy and
resource impacts
Benefits: for energy, advanced materials and
environmental monitoring. Direct impacts
include energy, cooling, materials and
equipment waste.
Risks: increased electricity and cooling demand,
use of specialised materials and generation of
electronic and industrial waste from additional
infrastructure and equipment.
PO1 has limited direct effects.
PO2 may support selected
shared capacity, which could
increase direct infrastructure-
related impacts.
PO3 has the same central
infrastructure configuration as
PO2; any additional effects
would depend on separate
funding decisions, rather than
the option itself.
Table 8.16. Wider Impacts
52. OVERALL CONCLUSION
PO1 has the lowest cost and burden but remains vulnerable to incomplete participation and
leaves significant delivery gaps. PO3 provides the highest formal coverage for several
objectives but entails the highest societal cost, public-budget impact, administrative capacity
needs and risks of market restriction, duplication and premature technology lock-in.
PO2 provides the best overall balance. It creates durable coordination and research-to-
deployment pathways, improves access, finance and demand, and introduces targeted
standards, quantum-safe and dependency measures while limiting obligations to defined
actors and activities. Its success depends on effective use of existing bodies, adequate future
program resources, transparent selection, high facility utilization, private additionality,
proportionate information requests and continuous simplification.
117
ANNEX 9: COHERENCE WITH EXISTING EU LEGISLATION AND
INITIATIVES (ACQUIS MAPPING)
53. PURPOSE AND SCOPE
This annex assesses the coherence of the proposed EU Quantum Act with the principal
Union legislative, policy, funding and implementation frameworks relevant to quantum
technologies. It supports the coherence assessment in Chapter 7 of the Main Report and
explains how the final PM1–PM16 architecture would complement existing instruments
without duplicating their legal, financial, programme-management, procurement,
standardisation, cybersecurity, investment-screening or enforcement functions.
The quantitative analytical cut-off is 19 July 2026. For the purposes of coherence and
additionality, this Annex also takes account qualitatively of relevant initiatives proposed or
adopted up to 30 September 2026. It takes account in particular of Council Regulation (EU)
2026/150 amending the EuroHPC Regulation, Regulation (EU) 2026/1386 on the screening
of foreign investments in the Union and the Commission proposal for the Chips Act 2.0, the
Cloud and AI Development Act, the EU Inc. Corporate legal framework, the European
Innovation Act and the Public Procurement Act. Pending initiatives, including the European
Research Area Act and the revision of the European Standardisation Regulation, are
considered where relevant to future coherence but are not treated as applicable acquis.
54. PRINCIPLES GOVERNING COHERENCE AND ADDITIONALITY
1. The Quantum Act would address residual coordination and delivery gaps identified
against the dynamic baseline. It would not attribute to the Act activities, expenditure or
outcomes that would occur under existing Union or Member State instruments.
2. Existing competent bodies and instruments would be used wherever they can perform
the required function. The Act would create new structures only where a specific
coordination or delivery gap cannot be addressed proportionately through an existing
body.
3. The Quantum Strategy Board would provide ecosystem-level strategic review and EU–
Member State coordination. It would not replace the statutory programming,
procurement, infrastructure or funding functions of EuroHPC, the Chips Joint
Undertaking, the Commission, financial institutions or Member State authorities.
4. The European Quantum Alliance would be a light stakeholder interface. It would not
duplicate the formal advisory functions of EuroHPC bodies or exercise funding,
certification, procurement or enforcement powers.
5. Strategic Project designation would recognise European relevance and facilitate
coordination. It would not create an automatic entitlement to funding, State-aid approval,
procurement preference, regulatory exemption or priority access.
6. Existing facilities would be mapped, networked and used before additional capacity is
supported. New or upgraded capacity would require evidence of a European capability
gap, unmet demand, cross-border added value, expected utilisation and operational
sustainability.
7. Investment decisions would remain with the EIC, InvestEU, the EIB Group, national
promotional institutions and other competent financial bodies under their own legal,
governance, risk and additionality rules.
8. Procurement support would preserve the responsibilities of contracting authorities. Any
security, resilience, participation or sourcing conditions would require prior market
analysis and case-specific justification under applicable Union and international rules.
118
9. Formal standards would continue to be developed through the recognized European and
international standardization system. The Act would not create a parallel standards body.
10. Under PO2, PQC and quantum-safe preparedness would be addressed through a biennial
EU preparedness assessment based on information from Member States and Union
entities, coordinated exercises and PQC requirements in public procurement, together
with structured cooperation between the Quantum Strategy Board and the NIS
Cooperation Group, providing regular exchange, coordination and monitoring of
implementation of the existing PQC roadmap. The assessment and exercises use existing
cybersecurity structures and reporting channels. Under PO3, defined critical public
authorities and, where justified, critical operators would be subject to binding roadmap-
implementation duties through existing competent cybersecurity authorities.
11. Information requests would be necessary, proportionate, risk-based and limited to
information unavailable from existing sources. Common definitions, interoperable
formats, data minimization and once-only reuse would apply across the package.
12. International cooperation would remain open and criteria-based. Stronger participation
or security conditions would be limited to clearly defined sensitive or strategic contexts
and would respect the Union's international commitments.
55. DETAILED COHERENCE AND NON-DUPLICATION MAPPING
Instrument or initiative Residual issue Quantum Act
complement
Non duplication
safeguard
Quantum Europe Strategy,
COM(2025) 363 final
Political direction
but no durable
common
implementation
cycle or complete
delivery
framework
PM1–PM16
operationalise
selected actions
through coordination
and delivery
pathways
The Act implements
the Strategy;
priorities remain
periodically
reviewable
EuroHPC Regulation, Regulation
(EU) 2021/1173 as amended by
Council Regulation (EU) 2026/150
Broad quantum
implementation
mandate, but not
complete
alignment of all
national strategies,
budgets or external
policy functions
PM1–PM7, PM9,
PM11 and PM14–
PM16 may structure
ecosystem-level
coordination and
feed implementation
EuroHPC retains
statutory
programming,
procurement,
infrastructure and
funding functions
EuroHPC Quantum Technologies
Advisory Group
Formal advice on
EuroHPC quantum
activities
PM16 provides a
wider light interface
across users, finance,
procurement,
standards and value
chains
Alliance outputs are
routed to the
competent formal
body
Horizon Europe and successor R&I
instruments
Excellent and
collaborative R&I
PM2–PM3 connect
research to common
priorities, milestones
and later maturation
Programme
excellence,
eligibility and
financial rules
remain unchanged
Digital Europe Programme Deployment,
strategic digital
capacities and
skills
PM6 and PM9
improve user access,
training and
deployment support
Programme
authorities retain
selection and
funding
responsibility
119
European Chips Act, Chips JU and
the pending Chips Act 2.0 proposal
Semiconductor
design, pilot lines,
capacity, demand
and resilience
PM4–PM6 connect
quantum systems,
photonics,
cryogenics, control,
software and users to
Chips-supported
capabilities
Quantum-chip
fabrication and
semiconductor pilot
lines remain under
Chips JU; pending
proposal is not
treated as applicable
acquis
Cloud and AI Development Act Cloud and AI
infrastructure and
capacity
PM4–PM6 connect
quantum testing,
integration and
deployment with
relevant cloud and
AI infrastructures
Cloud and AI
infrastructure
governance, funding
and regulatory
functions remain
under the relevant
framework
EuroQCI, CEF and IRIS² Secure-
connectivity
infrastructure and
deployment
PM4–PM6, PM8,
PM7, PM11 and
PM14 support
access, testing,
interoperability,
users and resilient
supply
Infrastructure
governance,
security
accreditation and
procurement remain
under the relevant
instruments
EIC, InvestEU and EIB Group Grants, equity,
guarantees, debt
and project finance
PM5 and the
Quantum Investment
Service Desk
improve project
preparation,
referrals,
syndication,
financing continuity
and, where justified,
European co-
investment or
coordinated
counteroffers
concerning strategic
capabilities.
Financial
institutions retain
independent due
diligence and
decisions
STEP and proposed European
Competitiveness Fund
Visibility and
potential financing
of strategic
technologies
PM5 identifies and
prepares relevant
quantum projects
Quantum
designation remains
legally separate
from STEP, ECF or
equivalent status
European Defence Fund and defence
instruments
Defence R&I and
capability
development
PM2–PM5, PM7,
PM9, PM11 PM15
and PM14 may
improve civilian-
security interfaces
Defence eligibility,
ownership, security
and funding rules
remain fully
applicable
Procurement Directives and Financial
Regulation
Equal treatment,
transparency,
competition and
procedural rules
PM7 provides buyer
coordination,
functional
specifications,
PCP/PPI and
reference
deployment
Contracting
authorities retain
award
responsibility; any
conditions are
necessary and
proportionate
State-aid and competition rules Govern public
support,
cooperation and
market conduct
PM5 coordinates
projects and funding
pathways; PM7 and
PM10 improve
finance and demand
preparation
Designation does
not constitute State-
aid approval or
displace
competition
assessment
120
European standardisation
framework, Regulation (EU) No
1025/2012
Formal European
standardisation
procedures
PM8 supports
roadmaps, pre-
standardisation,
benchmarks and
testing references
CEN, CENELEC,
ETSI and
international bodies
retain formal
standard-setting
functions
NIS2 Directive Technology-
neutral
cybersecurity risk
management and
reporting
PM13 provides
quantum-specific
technical advice and
implementation
support
NIS2 authorities
retain supervision
and enforcement; no
duplicate reporting
Cybersecurity Act ENISA and
European
cybersecurity
certification
framework
PM8 and PM13
support technical
preparation and
reference applicable
schemes
No competing
horizontal Quantum
Act certification
regime
Cyber Resilience Act Cybersecurity
requirements for
products with
digital elements
PM13 coordinates
quantum-safe
implementation
support
Product obligations
remain governed by
the CRA; duplicate
documentation is
avoided
PQC Recommendation (EU)
2024/1101 and coordinated roadmap
Common
direction,
milestones and
technical basis for
PQC transition
PM13b establishes
structured
cooperation between
the QSB and the NIS
Cooperation Group
for regular exchange,
coordination and
monitoring of
implementation of
the existing
roadmap; the
biennial
preparedness
assessment and
exercises build on
the roadmap
milestones and reuse
existing reporting.
No competing
algorithms or
parallel
cybersecurity
regime. PO3-
specific duties
would be targeted,
risk-based, aligned
with the existing
roadmap and
implemented
through existing
competent
authorities.
Economic Security Strategy and
Recommendation (EU) 2023/2113
Risk-based
framework for
technology
security, leakage
and resilience
PM11 supplies
quantum-specific
technical mapping
and early warning
The Act provides
evidence and
mitigation support,
not a parallel risk-
assessment regime
FDI Screening Regulations (EU)
2019/452 and (EU) 2026/1386
Transaction-
specific screening
on security or
public-order
grounds
PM11 may provide
aggregated technical
information to
competent
authorities
No Quantum Act
notification,
authorisation,
statutory matching
or step-in
mechanism. The
Quantum
Investment Service
Desk may facilitate
voluntary European
co-investment or
coordinated
counteroffers
without affecting
the competent
authority’s FDI-
screening decision.
121
Dual-use Regulation (EU) 2021/821 Export, brokering,
technical
assistance and
transfer controls
PM11 maps import-
side dependencies
and resilience needs
Classification,
authorisation and
enforcement remain
under export-control
law
Critical Raw Materials Act Secure and
sustainable supply
of listed materials
PM11 covers
quantum-specific
manufactured
components,
equipment, software
and services outside
the material scope
Quantum-specific
manufactured
components not
covered by the
CRMA material
framework are
complemented
Foreign Subsidies Regulation Addresses
distortions caused
by foreign
subsidies
PM5 and PM7 may
identify projects or
procurements
relevant to the wider
framework
Commission powers
and notification
procedures remain
unchanged
GDPR, Trade Secrets Directive and
Data Act
Personal data,
confidential
business
information and
lawful data use
PM11–PM12 use
minimisation,
aggregation, access
controls and purpose
separation
Appropriate legal
basis,
confidentiality and
procedural rights
apply
EU Inc. corporate legal framework Optional EU-wide
corporate
framework
facilitating
company
establishment and
cross-border scale-
up
PM4–PM7 and
PM10 address
quantum-specific
scale-up needs
through
infrastructure access,
industrialisation,
deployment,
procurement and
finance
Company
formation, corporate
governance and
company-law
requirements remain
under the EU Inc.
framework and
applicable company
law
European Innovation Act Horizontal
framework
conditions for
innovation,
including
innovation
procurement
PM7 addresses
quantum-specific
innovation
procurement and
first-deployment
needs
Horizontal
innovation and
innovation-
procurement rules
remain under the
European
Innovation Act; no
parallel framework
is created
Public Procurement Act Horizontal rules
for public
contracts and
concessions
PM7 supports
quantum-specific
buyer coordination,
PCP/PPI and
reference
deployment
Procurement
procedures and
award
responsibilities
remain under the
horizontal
procurement
framework and with
contracting
authorities
European Research Area Act Horizontal
coordination of
Union and national
R&I policies and
investment,
researcher
mobility and
knowledge
circulation
PM1–PM3 and PM9
provide quantum-
specific
programming,
scientific
cooperation, Grand
Challenges and skills
coordination
Horizontal R&I
coordination,
mobility and
knowledge-
circulation functions
remain under the
ERA framework
Table 9.1. Detailed coherence and non-duplication mapping.
122
56. COMPARISON BETWEEN THE QUANTUM EUROPE STRATEGY ACTIONS AND
THE QUANTUM ACT MEASURES
Quantum Europe Strategy Actions Summary Quantum Act measures
Area 1: Quantum Research and Innovation Initiative
• Amend EuroHPC JU Regulation to extend its remit to all
quantum technologies and, as a first step, transfer present
Horizon Europe R&I quantum activities into the JU
• Present the Quantum Act proposal
• Pilot two Quantum Grand Challenges (Fault-Tolerant
Quantum Computing and Quantum PNT systems)
PM2, PM3
Area 2: Quantum Europe Infrastructures
• Publish EU Quantum Computing and Simulation Roadmap
• Expand the number and capacity of EuroHPC-based
quantum computing systems
• Set up a monitoring framework for quantum computing
• Deploy the first EU-interconnected experimental quantum
terrestrial and space secure communication network
• Publish a Quantum Communication Roadmap
• Launch a pilot facility for the European Quantum Internet
• Deploy a distributed system of gravimeters across Europe
• Publish a Quantum Sensing Roadmap
• Establish a European Q-MRI Pilot Infrastructure and scale
it up across Europe
PM4, PM5
Area 3: The Quantum Europe ecosystem
• Establish six new quantum pilot production lines under the
Chips Joint Undertaking
• Launch a quantum design facility
• Release a Quantum Chips Industrialisation Roadmap
• Publish a European Quantum Standards Roadmap
• Expand the network of quantum competence clusters
• Carry out and finalise EU-wide assessments of supply
chain vulnerabilities
PM1, PM6, PM7, PM8, PM10,
PM11, PM12, PM15, PM16
Area 4: Space & Dual Use Potential Quantum Technologies
(Security & Defence)
• Sign a cooperation agreement with ESA for the
development of a Quantum Technology Roadmap in space
• Develop a quantum sensing space & defence technology
roadmap
• Contribute to the European Armament Technological
Roadmap
• Launch spin-in initiatives to bring-in civil companies and
academia for defence applications
PM1, PM3 and PM5, where
relevant. Defence- and space-
specific actions remain under the
relevant Union instruments and
competent authorities.
Area 5: Quantum Skills
• Establish the European Quantum Skills Academy
• Launch European Advanced Digital Skills Competitions in
quantum
• Launch a Pilot Programme on Researcher-in-Residence in
Quantum technology startups
• Launch the European Quantum Mobility Programme
PM9, PM15
International Cooperation
• Launch bilateral and multilateral cooperation initiatives PM 14
123
• Work with the Member States to establish European
Quantum International Cooperation Framework
Table 9.2. Table comparing the Strategy’s actions with the Act’s measures
57. INTERFACES REQUIRING COORDINATED IMPLEMENTATION
Governance and EuroHPC. The Quantum Strategy Board should review ecosystem-level
priorities, national chapters, capability gaps, Strategic Projects and resilience findings. It
should not approve EuroHPC work programmes, procurement or infrastructure operations.
Recommendations should be transmitted to the competent body for decision.
Research, Grand Challenges and infrastructure. PM2–PM6 should form a continuous
but non-automatic pathway. Success in research or a Grand Challenge should not guarantee
infrastructure access, designation, funding or procurement. Existing capacity must be
assessed before new capacity is financed, and reporting must distinguish scientific,
maturation and user-support functions.
Pilot lines, Strategic Projects and finance. PM5 should improve coordination and project
preparation without prejudging the decisions of programmes, financial institutions, State-
aid authorities or contracting authorities. Under PO3, a dedicated quantum investment
mandate or capacity would operate within an existing or future financial instrument rather
than creating a new stand-alone institution. Its implementation would require clear
governance, additionality, risk-sharing and budgetary arrangements.
Procurement. PM7 should use functional requirements, staged competition and multiple
suppliers where feasible. A Grand Challenge or Strategic Project must not automatically
determine a subsequent procurement winner. Any preference, eligibility or security
condition must be justified by the market and sensitivity of the use case.
Standards, assurance and sandboxes. PM8 may support benchmarks, test methods,
interoperability profiles and certification-readiness. Formal standards remain voluntary
unless incorporated into a separate legal requirement. Regulatory experimentation must be
undertaken with the competent sectoral authority and cannot suspend applicable law without
an existing legal basis.
PQC and cybersecurity. Under PO2, the preparedness assessment, coordinated exercises
and PQC requirements in public procurement are organised with the NIS Cooperation Group
and the competent authorities, without creating a parallel cybersecurity regime.Under PO3,
defined critical public authorities and operators would additionally be subject to targeted
preparedness duties implemented through the existing competent authorities.
Dependencies and economic security. PM11 may support supplier diversification,
qualification of alternatives and contingency planning. Screening, export-control,
competition, State-aid, foreign-subsidy and procurement decisions remain with the
competent authorities.
Business Platform and data governance. PM12 is voluntary. Information submitted for
commercial matchmaking must not automatically be repurposed for regulatory or economic-
security action. Mandatory requests under PM11 require a separate lawful purpose,
transparency and safeguards.
58. INTERNAL-MARKET COHERENCE AND LEGAL-BASIS IMPLICATIONS
The predominant objective and content of the retained package concern the competitiveness
and resilience of the Union’s quantum-technology industrial ecosystem. Article 173(3)
TFEU therefore constitutes the principal legal basis for the current package. Article 114
TFEU constitutes only for clearly separable provisions approximating national rules where
124
concrete or likely internal-market obstacles or appreciable distortions of competition are
demonstrated.
Any provision based on Article 114 should identify:
• the existing or likely divergent national rules concerned;
• the concrete obstacle to cross-border trade or appreciable distortion of competition;
• the products, services and actors affected;
• why mutual recognition, programme conditions or voluntary coordination are
insufficient; and
• why the proposed harmonisation is necessary and proportionate.
Where this evidence is not available, the relevant measure should remain an industrial-
policy, research, programme, procurement, funding or voluntary-standardisation measure.
The final legal basis and provision-by-provision justification remain subject to Legal Service
confirmation.
59. OVERALL CONCLUSION
The preferred option is coherent with the Union acquis and current initiatives provided that
it operates as a connecting and delivery framework rather than a parallel programme or
regulatory system. Its added value lies in common strategic review, continuity between
research and deployment, structured project, finance and procurement pathways, user
support, shared technical references, quantum-safe coordination and targeted dependency
intelligence.
Coherence depends on respecting the statutory mandates of EuroHPC, the Chips JU,
programme authorities, financial institutions, cybersecurity and economic-security
authorities and contracting authorities; avoiding automatic benefits from designation;
reusing existing structures and data; and limiting stronger requirements to mature, clearly
defined and objectively justified contexts.
Intervention
dimension
PO1 – Voluntary
horizontal framework
PO2 – Enabling Quantum
Framework Act
PO3 – High-
intensity targeted
framework
Overall
approach
Non-legislative,
voluntary and market-
enabling. No new
mandatory requirements.
Targeted legislative framework
establishing structured EU–
Member State governance and
delivery arrangements, mainly
through existing bodies.
Retains PO2
architecture but
applies higher-
intensity variants to a
limited number of
measures.
R&I excellence Voluntary EU–Member
State coordination,
research networking and
alignment on common
priorities and challenges
(PM1–PM3).
Common programming
framework, European Quantum
S&T Excellence Network and
competitively selected,
milestone-based Grand
Challenges (PM1–PM3).
Same as PO2.
Industrialisation,
deployment and
demand
Voluntary access and
user-support
arrangements,
investment-readiness
support, skills
coordination, pre-
standardisation and buyer
cooperation (PM4–
PM10).
Technology and Innovation
Hubs, Strategic European
Quantum Infrastructures and
large-scale Quantum Projects
, Competence and Acceleration
Centres, innovation
procurement, standards and
benchmarking, skills and
mobility, and structured access
to financing (PM4–PM10).
Same architecture as
PO2, with stronger
variants for
investment capacity
and selected strategic
procurement
condition.
125
Security and
resilience
Voluntary dependency
information and
dashboard, business
matchmaking, technical
quantum-safe exchange
and existing international
cooperation (PM11–
PM14).
Risk-based dependency
mapping and early warning,
voluntary Business Platform,
quantum-safe preparedness
(assessment, exercises,
procurement requirements and
implementation support) and
strategic international
cooperation (PM11–PM14).
PO2 support
architecture with
wider information
requirements for
defined critical
dependency
categories; other
measures remain as
under PO2.
Governance and
delivery
Voluntary cooperation
and informal
coordination.
Quantum Strategy Board and
European Quantum Alliance;
implementation principally
through existing competent
Union and national bodies
(PM15–PM16).
Same governance and
delivery architecture
as PO2.
Table 9.3. Comparative summary of the policy options
126
ANNEX 10: MONITORING AND EVALUATION FRAMEWORK
60. PURPOSE AND INTERVENTION LOGIC
This annex sets out the monitoring and evaluation framework for the preferred option. The
core indicators also provide the basis for assessing the added value of PO2 compared with
the dynamic baseline. It operationalises the intervention logic established in the Main
Report: problem drivers → problems → specific objectives → policy measures → outputs
→ results → impacts.
The framework serves four purposes:
• to monitor whether the measures established or enabled by the Quantum Act are
implemented as intended;
• to assess whether they improve the functioning and performance of the European
quantum ecosystem;
• to support evidence-based adjustment, continuation, scaling, simplification or
termination of measures; and
• to provide the evidence required for the evaluation of the initiative.
Monitoring will begin from the date of application. The principal policy horizon is 2030.
Costs, burdens and implementation resources will be monitored over the 2028–2037
assessment period, while longer-term trends may be examined up to 2035 or later where
data are reliable.
The framework distinguishes output indicators, result indicators and impact indicators. It
does not assume that all observed changes can be attributed to the Quantum Act.
Technological breakthroughs, macroeconomic conditions, national investment, other Union
instruments and international developments will also affect outcomes.
61. MONITORING PRINCIPLES
Principle Operational meaning
Reuse before new
collection
Reuse information held by Union bodies, Member States, programmes,
financial institutions, infrastructure operators and competent authorities
wherever lawful and technically possible.
Proportionality Match frequency and granularity to the measure, public support, strategic role,
sensitivity, maturity, risk and administrative capacity of the reporting actor.
Annual reporting as
default
Use more frequent reporting only for project milestones or defined early-
warning situations.
Monitoring by function Record scientific excellence, technology maturation and user-support
functions separately even where one organisation performs more than one
function.
Outcome orientation Track progression, access, finance, customers, utilisation, skills and
mitigation, not only expenditure, meetings or designations.
Technology and
maturity differentiation
Disaggregate computing and simulation, communication, sensing and
metrology and enabling technologies where materially different.
Confidentiality and
security
Use aggregation, anonymisation, restricted access and secure systems for
commercially or security-sensitive information.
Adaptive
implementation
Simplify, revise or discontinue indicators and measures that do not provide
proportionate analytical or operational value.
No duplicate reporting Apply common definitions, interoperable formats, pre-filled forms and once-
only reuse across PM1–PM16.
Table 10.1. Monitoring principles.
62. GOVERNANCE AND MONITORING CYCLE
The Commission will have overall responsibility for monitoring implementation and
impacts. Member States will provide structured inputs through national quantum chapters
127
and the Quantum Strategy Board. EuroHPC JU, the Chips JU and other implementing bodies
will provide programme, project, facility and infrastructure data. Financial institutions will
provide aggregated pipeline, operation and private-mobilisation data. Public buyers,
supported projects, Strategic Projects, infrastructure operators, standards and testing bodies,
ENISA and relevant cybersecurity structures will contribute through existing or
proportionate reporting channels.
The Quantum Strategy Board will review implementation strategically. It will not replace
programme management, statutory monitoring, supervision or enforcement assigned to
other bodies. The European Quantum Alliance may provide stakeholder feedback but will
not validate official results.
Monitoring
product
Timing Principal content Responsibility
Initial baseline and
indicator
dictionary
Within six
months of
application
Definitions, populations, data owners,
sources, baselines, milestones,
confidentiality and cost of collection
Commission with
Member States and
implementing
bodies
Annual
implementation
dashboard
Annually Stable core indicators, outputs, costs,
burdens, participation, access, finance,
procurement and risk findings
Commission
National quantum
chapters/review
At least
annually or as
defined in the
Act
National priorities, programmes,
investments, infrastructures, milestones
and implementation issues
Member States and
Commission
Thematic reviews As needed,
normally every
two years
Infrastructure utilisation, finance
additionality, procurement conversion,
standards uptake, skills, dependencies or
burden
Commission and
relevant competent
bodies
Mid-course
implementation
review
Approximately
three years after
application
Operational effectiveness, burden,
utilisation, duplication and need for
adaptation
Commission and
Quantum Strategy
Board
Comprehensive
evaluation
Five years after
entry into force
Effectiveness, efficiency, coherence, EU
added value, proportionality and
continued relevance
Commission,
supported by
independent
evaluation where
appropriate
Table 10.2. Monitoring and evaluation cycle
63. CORE INDICATORS BY SPECIFIC OBJECTIVE
Objective Core indicators Baseline 2030 milestone or
direction
Source/frequency
SO-A –
Coordination
and delivery
National chapters
submitted and
updated; common
reviews completed;
recommendations
followed up; identified
gaps or overlaps
addressed
Fourteen Member
States had
strategies and four
were preparing
one; no common
Union review
cycle
Chapters from all
Member States;
regular review and
dashboard; findings
addressed or
explained
Commission,
Member States
and programme
data; annual
SO-B – Lab-
to-fab and
infrastructure
access
Facilities participating;
users supported; SME
and cross-border use;
utilisation; waiting
times; progression to
validation or
qualification
91 testbeds and 27
pilot lines
mapped; 18
testbeds and eight
pilot lines
identified as open
to start-ups
Supported facilities
publish access and
utilisation
information; SME
and cross-border
use increases;
waiting and
validation times
decrease
EuroHPC, Chips
JU, facilities and
access systems;
annual
128
SO-C – Scale-
up finance
Firms referred and
financed; public and
private capital
mobilised; follow-on
rounds; cross-border
syndication; firms
reaching scale
indicators
EU firms under-
represented in
mapped rounds
above EUR 25m;
fragmented
financing
pathways
Increased
participation in
later-stage rounds,
cross-border
finance and private
co-investment;
continuity improves
EIC, InvestEU,
EIB/EIF, national
institutions and
market data;
annual
SO-D –
Demand and
first buyers
PCP/PPI actions;
reference
deployments; pilots
progressing to follow-
on or repeat
procurement; buyer
number and diversity
32 computing
procurement
schemes, 52
communication
deployments and
one microsatellite
initiative mapped;
no systematic
conversion
baseline
Conversion baseline
established in first
cycle; increasing
share progresses to
reference or repeat
procurement
Public buyers,
procurement
systems and
supported
projects; annual
SO-E – Skills
and user
support
People trained;
placements and
mobility; user
organisations
supported; vacancy
and skills-gap
indicators;
participation by sex
where available
Around 40
specialised
master’s
programmes; no
harmonised Union
skills-gap or user-
capability baseline
Common baseline
established;
participation and
completion
increase; supported
activities include
relevant skills or
user-capability
measures
Programmes,
training providers,
employers and
surveys;
annual/biennial
SO-F –
Trusted and
quantum-safe
deployment
Benchmarks, testing
methods and
specifications
developed and used;
voluntary assurance
activities; structured
PQC cooperation
between the
Commission, Member
States and relevant
bodies and
participation; biennial
PQC preparedness
assessments
completed; Member
States providing
information and taking
part in exercises;
public procurement
procedures applying
PQC requirements
165
standardisation
items mapped,
around 30%
published formal
standards;
coordinated PQC
roadmap in place
Increasing use of
common methods in
mature areas;
structured QSB–
NIS Cooperation
Group cooperation
operational, with
broad Member State
participation;
biennal PQC
preparedness
assessments
completed (the first
by the end of 2028
and coordinated
exercises held.
Standards bodies,
testing
organisations,
ENISA and
Member State
channels; annual
SO-G –
Dependencies
and resilience
Critical inputs
assessed; alternatives
qualified; mitigation
actions initiated;
substitution time and
disruption delays
47 inputs mapped;
nine without an
identified EU
supplier;
alternative
sourcing weaker at
sub-component
level
Listed inputs
periodically
reviewed;
mitigation for high-
risk dependencies;
alternatives increase
and delays decrease
Strategic-
intelligence
system,
programmes and
restricted
evidence; annual
or risk-triggered
Table 10.3. Core indicators by specific objective
129
64.OPERATIONAL INDICATORS BY POLICY MEASURE
Policy measure Principal implementation and early-result
indicators
Data owner Frequency
PM1 – Common
programming
framework
National chapters; common priorities;
overlaps/gaps identified and addressed; time
to follow-up
Commission
and Member
States
Annual
PM2 – Quantum
Science and
Technology (S&T)
Excellence Network
Participating organisations and Member
States; joint priorities; mobility; progression
to later support
Research
programmes
and network
Annual
PM3 – Quantum
Grand Challenges
Calls, participants, milestones achieved,
continuation/stop decisions and outputs
progressing to validation
Implementing
programme
Per milestone
and annual
PM4 – Technology and
Innovation Hubs
Facilities, service catalogues, access requests,
waiting time, utilisation, SME and cross-
border use
Facility
operators and
access
systems
Annual
PM5 – Strategic
Quantum
Infrastructuress and
Strategic Quantum
Projects
Applications, designations, processing time,
milestones, review decisions, finance and
procurement follow-up
Commission
and project
promoters
Annual/per
milestone
PM6 – Competence
and Acceleration
Centres
Users supported, referrals, use cases, training,
satisfaction and progression to facilities,
finance or buyers
Centre
operators
Annual
PM7 – Innovation
Procurement
Buyer groups, PCP/PPI, suppliers, reference
deployments, follow-on procurement, cycle
time and price premium
Public buyers Annual
PM8 – Standards,
benchmarking and
assurance
Roadmaps, work items, benchmarks, testing
methods, use in projects/procurement and
repeated testing avoided
Standards and
testing bodies
Annual
PM9 – Skills and
mobility
Training actions, participants, completion,
placement, mobility, vacancy indicators and
user capability
Programmes
and providers
Annual/bienn
ial
PM10 – Quantum
Investment Service
Desk
Firms advised and referred; investment-
readiness support provided; referrals resulting
in financing; follow-on investment; time from
referral to financing decision.
Financial
institutions
Annual
PM11 – Strategic
intelligence and
dependency
monitoring
Categories mapped, requests, response
burden, alerts, mitigation, alternatives and
disruption duration
Commission
and competent
bodies
Annual/risk-
triggered
PM12 – Quantum
Business Platform
Users, matches, opportunities,
investment/user contacts, satisfaction and
data-quality indicators
Platform
operator
Annual
PM13 – Quantum-safe
preparedness
Structured PQC cooperation between the
Commission, Member States and relevant
bodies, participation and evidence on
implementation of the existing PQC roadmap;
preparedness assessments published (the first
by the end of 2028), exercises held and
Member States taking part; procurement
procedures applying PQC requirements.
Commission,
ENISA and
relevant
bodies
Annual
PM14 – Strategic
international
cooperation
Partnerships, reciprocity, participation, joint
standards/research/supply actions and
safeguards
Commission
and
programme
bodies
Annual
130
PM15 – Quantum
Strategy Board
Board established; meetings and reviews;
recommendations; implementation follow-up
Commission
and Board
secretariat
Annual
PM16 – European
Quantum Alliance
Membership and balance; meetings;
contributions used; stakeholder satisfaction
Alliance
secretariat
Annual
Table 10.4. Operational indicators by final policy measure
65. HORIZONTAL INDICATORS
Dimension Indicators
SMEs and start-ups Applicants, users, beneficiaries, success rates, finance, procurement, waiting
time and burden by micro, small and medium-sized enterprise
Territorial distribution Participation and benefits by Member State and region; cross-border access;
concentration of support and facilities
Competition and market
structure
Supplier and beneficiary concentration, number of suppliers retained, new
entrants and use of proprietary interfaces
Environmental
performance
Energy, cooling, water, materials, utilisation and comparison with feasible
alternatives where material
Fundamental rights and
procedural safeguards
Requests, objections, review, appeals, confidentiality incidents, data-protection
issues and processing time
Administrative burden and
simplification
Actual staff time and cost by actor; reporting cycles and fields; reused data;
duplicate requests avoided; SME burden; deviation from ex ante assumptions
International cooperation Partnerships, reciprocity or market-access arrangements and participation of
partners in relevant projects and procurement
Gender and inclusion Participation in skills, mobility and relevant actions where reliable and
proportionate data are available
Public-budget and staffing Actual EU and Member State expenditure, transfers, Commission and Member
State person-days/FTE and implementing-body resources
Table 10.5. Horizontal monitoring dimensions
66. INDICATOR MANAGEMENT AND DATA QUALITY
A common indicator dictionary will be prepared within six months of application. For each
indicator it will specify:
• identifier, title and link to the intervention logic and policy measure;
• output, result or impact classification;
• definition, unit, population, scope, baseline and direction of travel;
• data source, data owner, reporting body and frequency;
• validation method and required breakdowns;
• confidentiality classification and retention conditions;
• estimated cost of collection and known limitations; and
• conditions for revision or discontinuation.
Principal quality risks include incomplete coverage, inconsistent definitions, double
counting, self-reporting, survivorship bias, unavailable firm-level data, confidentiality
restrictions, technology differences and attribution of wider market changes.
These risks will be addressed through common definitions, data reconciliation, audit
sampling, methodological transparency, case studies, independent studies and stable time-
series metadata. Changes in definitions or population coverage must be documented.
67. DATA GOVERNANCE AND CONFIDENTIALITY
Issue Safeguard Practical implementation
131
Data minimisation Collect only data necessary for
implementation, monitoring or
evaluation
Limit fields and populations; apply
thresholds and risk-based scope
Reuse and once-only
reporting
Reuse information already available Pre-fill forms and use interoperable
templates and lawful data-sharing
arrangements
Commercial
confidentiality
Protect trade secrets and sensitive
business information
Aggregation, restricted access,
anonymisation and secure channels
Security-sensitive
information
Separate public monitoring from
restricted intelligence
Role-based access and secure systems
Personal data Apply applicable data-protection
principles and rules
Purpose limitation, lawful basis,
retention limits and impact screening
Data quality Use common definitions and
validation
Indicator dictionary, automated checks,
workshops and audit samples
Proportionality Match reporting to risk, support and
actor capacity
Annual default, simplified SME formats
and targeted requests
Transparency Explain methodologies and changes Public metadata and methodological
notes for aggregated indicators
Procedural rights Allow correction and review where
information is used in formal
decisions
Notification, right to be heard and
review arrangements
Table 10.6. Data-governance safeguards
Non-participation in the voluntary Business Platform must not lead to additional regulatory
reporting or adverse treatment. Information supplied for commercial matchmaking must not
be reused automatically for regulatory or economic-security purposes without an appropriate
legal basis and safeguards.
68. COST AND BURDEN MONITORING
Actual implementation costs will be compared with the ex ante central estimates in Annex
4. Monitoring will distinguish administrative burdens, adjustment costs, enforcement and
implementation costs, participation costs that are not compliance costs, other real-resource
costs, public expenditure, transfers and financing volumes.
For the preferred option, deviations should be examined at least annually. Material increases
should trigger analysis of population coverage, reporting frequency, staff time, unit cost,
facility utilisation, duplication and whether simplification or narrowing of scope is required.
69. EVALUATION FRAMEWORK
The Commission will carry out a comprehensive evaluation five years after entry into force.
The timing should allow the principal governance, access, finance, procurement and
monitoring mechanisms to operate while enabling the findings to inform future
programming and any amendment of the framework.
Criterion Principal evaluation questions Main evidence
Effectiveness To what extent were SO-A–SO-G achieved?
Which measures produced the intended outputs
and results? Which causal pathways were
supported by evidence?
Monitoring data, program data,
surveys, interviews, case studies
and comparative analysis
Efficiency Were costs and burdens proportionate to results?
Did actual costs differ from ex ante estimates?
Were facilities and support effectively used?
Updated Standard Cost Model,
expenditure, staffing, burden
and utilization data
Coherence Did the Act complement EuroHPC JU, Chips JU,
programs, cybersecurity and economic-security
instruments without duplication?
Acquis mapping, governance
records, stakeholder and
institutional evidence
EU added value Which outcomes required Union scale, cross-
border access, common intelligence or integrated
demand and finance pathways?
National counterfactuals, cross-
border participation, case studies
132
and comparison with non-
supported activity
Relevance Do the problems and objectives remain material
given technological, market and international
developments?
Updated problem indicators,
market evidence, technology
review and stakeholder
consultation
Proportionality
and rights
Were obligations, information requests,
procurement and assurance requirements
necessary and proportionate? Were safeguards
effective?
Complaints, review decisions,
burden data, rights and
confidentiality incidents
SME and
distributional
impacts
How were costs and benefits distributed by firm
size, Member State, region, technology domain
and actor type?
Disaggregated administrative,
finance, access, procurement
and skills data
Sustainability
and resilience
Did the initiative improve capability, supplier
diversity, trusted deployment and continuity
without unjustified restriction of openness?
Dependency mapping,
disruption cases, standards
uptake and international-
cooperation evidence
Table 10.7. Evaluation criteria and questions
70. EVALUATION DESIGN AND METHODS
The evaluation will use a mixed-method approach, including:
• administrative, programme, firm, investment and procurement data;
• infrastructure-access, waiting-time and utilisation analysis;
• surveys and interviews with firms, users, buyers, researchers, Member States and
implementing bodies;
• project, technology and value-chain case studies;
• process tracing and contribution analysis;
• comparison of supported and non-supported firms, projects, facilities or
procurements where feasible;
• international comparison;
• updated Standard Cost Model and burden estimates; and
• secure analysis of confidential or security-sensitive evidence.
The evaluation must distinguish the contribution of the Act from general technological
progress, macroeconomic developments, national expenditure, other Union programmes
and international policy changes. Where direct attribution is not possible, it should assess
the plausibility and strength of the initiative's contribution.
71. REVIEW AND ADAPTIVE IMPLEMENTATION
Monitoring and evaluation findings will inform:
• revision of strategic priorities and future Grand Challenges;
• selection, continuation, modification or termination of supported measures;
• Strategic Project designation and review;
• infrastructure-capacity and access decisions;
• finance and procurement pipeline design;
• standards, testing, skills and quantum-safe priorities;
• dependency mitigation and international cooperation;
• simplification of reporting and information requests; and
• possible amendment of the legal or delivery framework.
A measure should be adapted, suspended or terminated where evidence shows that it:
• does not provide sufficient Union added value;
133
• duplicates another instrument;
• creates disproportionate administrative or compliance costs;
• produces insufficient use or demand;
• distorts competition without adequate justification;
• locks in an immature technology;
• creates unnecessary barriers to cooperation; or
• no longer responds to a material policy need.
Any future consideration of a stand-alone financial vehicle, broader assurance requirements,
stronger reporting or additional binding quantum-safe obligations would require updated
evidence and, where appropriate, a new impact assessment.
134
ANNEX 11: SUPPORTING DATA AND ANALYTICAL EVIDENCE
This annex presents selected data and analytical findings from the PPMI/d-fine supporting
study and the Joint Research Centre (JRC) analysis used to inform the Impact Assessment.
The evidence is organised by thematic area, covering existing national policy measures,
research and innovation, commercialisation and financing, infrastructure accessibility,
supply-chain dependencies, public procurement and standardisation.
72. QUANTUM POLICY MEASURES
This section presents an overview of national policy measures supporting the development
of quantum technologies across EU Member States, based on the mapping conducted by the
supporting PPMI/d-fine study. It covers quantum-specific strategies and initiatives, as well
as the distribution of mapped national- and EU-level actions across key quantum technology
areas.
Table 11.1 provides an overview of quantum-specific strategies and initiatives adopted or
under preparation in EU Member States, including their implementation timelines and
associated funding envelopes, where available.
Member
State
Title Timeline Main funding envelopes
(estimations)
A. Adopted quantum-specific strategies and initiatives
Austria Quantum Austria Funding
Initiative 2021-2026 EUR 107 million
Czechia National Strategy for Quantum
Technologies
2026–2031,
to be updated in
2030 for 2031-
2036
EUR 192,5 million until 2030
Denmark National Strategy for Quantum
Technologies 2023-2027
EUR 130 million for R&I; EUR
26 million from 2024 to 2027 for
Commercialisation & Security
Finland Finnish Quantum Technology
Strategy 2025-2035 Not specified
France National Acceleration Strategy for
Quantum Technologies 2021-2025
EUR 1 billion in state
investment; EUR 1.8 billion
total
Germany
Quantum Technologies
Conceptual Framework
Programme of the Federal
Government
2024-2026
EUR 2.18 billion;
approximately EUR 850 million
in complementary research
activities
Ireland National Quantum Technologies
Strategy for Ireland
Towards 2030 Not specified
Italy Italian Strategy on Quantum
Technologies
2025-2030 Around EUR 200 million per
year for 5 years
Luxembourg Luxembourg's Quantum Strategy 2025-2030 EUR 100 million in total for
strategies for data, AI and
quantum
135
Table 11.1. Overview of quantum strategies and policy initiatives across EU Member States
The funding envelopes associated with these measures vary substantially, although direct
comparisons are limited by differences in scope, implementation periods and the availability
of quantum-specific funding information.
In addition to the quantum-specific strategies and initiatives presented in Table 11.1,
Member States support the development of quantum technologies through broader policy
frameworks at national and regional levels, including digitalisation, research and innovation,
cybersecurity and industrial strategies. Support is also provided through institutional
funding, dedicated projects and programmes. These additional measures are not covered by
the overview presented in Table 11.1.
Beyond the mapping of national strategies and initiatives, the supporting PPMI/d-fine study
also identifies national- and EU-level actions across four quantum technology areas. Table
11.2 presents the distribution of these mapped actions.
Quantum technology area National-level actions EU-level actions
Quantum computing and simulation 92 34
Quantum sensing and metrology 43 18
Quantum communication 24 9
Enabling technologies 11 10
Netherlands National Agenda for Quantum
Technology
Published in 2019 EUR 102 million annually,
including EUR 69 million from
existing programmes
Romania National Strategy for Quantum
Technologies for the period 2024 -
2029
2024-2029
Not specified
Slovenia Strategy for the Development of
Quantum Technologies in
Slovenia
Until 2035
Around EUR 54 million
Spain Spain Quantum Technologies
Strategy
2025-2030 EUR 808 million
Complementary Quantum
Communications Plan
- EUR 76 million
Sweden Swedish Quantum Agenda Published in 2023 Preliminary funding: EUR 4.6
million for 2027, EUR 9.2
million for 2028
B. Quantum-specific strategies and initiatives under preparation
Bulgaria
Draft Decision of the Council of
Ministers for approval of the
National Program "Increasing the
Capacity in the Field of Quantum
Informatics"
2025-2031 EUR 6.2 million (proposed)
Greece National Quantum Strategy (under
preparation) Towards 2030 Not specified
Poland Polish Quantum Strategy Forthcoming;
until 2035 EUR 1 billion (proposed)
Slovakia Strategy for the Development of
Quantum Technologies
2027-2035 Not specified
136
Table 11.2. Number of mapped national- and EU-level actions by technology area
73. RESEARCH AND INNOVATION IN QUANTUM TECHNOLOGIES
This section presents findings from the supporting PPMI/d-fine study on EU-funded
research and innovation projects in quantum technologies under Horizon 2020 and Horizon
Europe, as well as global patenting trends and the geographical distribution of patent activity
across quantum technology platforms.
73.0. EU-FUNDED QUANTUM RESEARCH AND INNOVATION PROJECTS
This subsection presents an overview of EU-funded research and innovation projects in
quantum technologies under Horizon 2020 and Horizon Europe. The analysis covers
quantum computing and simulation, quantum communication (including quantum key
distribution), quantum sensing and metrology, post-quantum cryptography, and key
enabling technologies, such as quantum photonics, cryogenics and control electronics.
Project-level information was extracted from the European Commission's CORDIS
database. Projects were classified according to their EU funding programme and funding
scheme, with the latter grouped into low- and high-technology readiness level (TRL)
categories. This classification enables an assessment of the number and timelines of projects
across different stages of technological development.
Table 11.3 presents the distribution of the identified projects by funding programme, TRL
category (Low/High) and completion status (Y/N). In total, 283 projects were identified, of
which 200 are classified as low-TRL and 83 as high-TRL.
Count of ID Projects
High High Total Low Low Total Grand Total
Completion status N Y N Y
H2020 1 17 18 2 92 94 112
ERA-NET-Cofund 1 1 2
2
IA 1 1 1
RIA 2 92 94 94
SME-1 6 6 6
SME-2 8 8 8
SME-2b 1 1 1
HORIZON 38 27 65 97 9 106 171
HORIZON-EIC 11 8 19 42 2 44 63
HORIZON-EIC-ACC 13 13 13
HORIZON-EIC-ACC-BF 3 19 22 22
HORIZON-IA 11 11 11
HORIZON-JU-RIA 5 1 6 6
HORIZON-RIA 50 6 56 56
Grand Total 39 44 83 99 101 200 283
Table 11.3. Number of EU-funded projects on quantum technologies by programme, TRL class and
completion status
137
73.0.1. Start year of EU-funded projects on quantum technologies
Table 11.4 presents the distribution of EU-funded quantum technology projects by start year,
funding programme (H2020/HORIZON) and TRL category (Low/High) over the period
2015–2026.
Year
Low TRL High TRL Grand Total
H2020 HORIZON TOTAL H2020 HORIZON TOTAL
2015 14 14
14
2016 4 4 2 2 6
2017 6 6 2 2 8
2018 26 26 2 2 28
2019 13 13 4 4 17
2020 21 21 5 5 26
2021 9 9 3 3 12
2022 1 29 30 15 15 45
2023 29 29 20 20 49
2024 20 20 12 12 32
2025 19 19 18 18 37
2026 9 9 9
Grand Total 94 106 200 18 65 83 283
Table 11.4. EU-funded quantum technology projects by start year, programme and TRL class
73.0.2. End year of EU-funded projects on quantum technologies
Table 11.5 presents the distribution of EU-funded quantum technology projects by end year,
funding programme (H2020/HORIZON) and TRL category (Low/High) over the period
2017–2032.
Low TRL High TRL Grand Total
Year H2020 HORIZON TOTAL H2020 HORIZON TOTAL
2017 1 1 2 2 3
2018 8 8 1 1 9
2019 7 7 4 4 11
2020 2 2 2
2021 7 7 1 1 8
2022 27 27 4 4 31
2023 15 15 4 4 19
2024 16 16 1 9 10 26
2025 8 8 16 13 13 29
2026 3 41 44 1 22 23 67
2027 29 29 14 14 43
2028 11 11 6 6 17
2029 10 10 1 1 11
2030 5 5 5
138
2031 1 1 1
2032 1 1 1
Grand Total 94 106 200 18 65 83 283
Table 11.5. EU-funded quantum technology projects by end year, programme and TRL class
The share of high-TRL projects among all EU-funded quantum technology projects
concluding each year increased from 21% in 2023 to 45% in 2025, indicating progress
towards validation and deployment.
73.1. PATENT ACTIVITY IN QUANTUM TECHNOLOGIES
This subsection presents an overview of global patenting activity in quantum technologies,
focusing on patent filing trends and the geographical distribution of patent activity across
seven technology families: superconducting circuits, trapped ions, neutral atoms,
semiconductor-based spin qubits, photonic qubits, diamond/nitrogen-vacancy (NV) centres,
and quantum metrology.
The analysis draws on patent data extracted from the European Patent Office's (EPO)
Espacenet database24 using technology-specific keyword searches and Cooperative Patent
Classification (CPC) codes25. The search results were grouped into patent families, with
exclusion filters applied to minimise overlaps between technology categories. The findings
were cross-validated, where applicable, against the European Quantum Industry
Consortium's (QuIC) 2026 white paper, A Portrait of the Global Patent Landscape in
Quantum Technologies26.
The following subsections present the findings of the supporting study, focusing on patent
filing trends over time and the geographical distribution of patent activity across quantum
technology platforms.
73.1.1. Global evolution of patent filings across quantum technology platforms
Table 11.6 presents the global evolution of patenting activity across seven quantum
technology families by earliest priority year, based on findings from the supporting PPMI/d-
fine study. The data indicate a substantial increase in patenting activity between 2018 and
2023, with superconducting circuits accounting for the largest number of identified patent
families, followed by trapped-ion technologies. While patenting activity increased across
most technology families over this period, the scale and pace of growth varied across
platforms.
Priority
Year
Technology family Total
per
year Super-
conducting
Trapped
Ions
Neutral
Atoms
Spin
Qubits
Photonic
Qubits
Diamond
/ NV
Quantum
Metrology
2018 133 26 6 15 4 23 21 228
2019 161 41 7 11 11 36 34 301
2020 260 70 29 22 33 44 34 492
2021 246 107 33 35 34 60 60 575
2022 333 152 48 26 32 56 46 693
2023 362 200 46 30 43 86 51 818
2024 195 103 21 15 34 49 61 478
24 European Patent Office (EPO), Espacenet – Patent Search. 25 European Patent Office (EPO), Quantum Technologies – Technology Platform. 26 QuIC (2026), A Portrait of the Global Patent Landscape in Quantum Technologies.
139
2025 51 7 9 1 7 7 40 122
Total
per tech 1741 706 199 155 198 361 347
Table 11.6. Global patent filing trends by earliest priority year and quantum technology platform
The lower figures recorded for 2024 and 2025 should be interpreted with caution, as recent
priority years are affected by patent publication delays and may not yet be fully represented
in the available data.
73.1.2. Geographical distribution of patent activity
Table 11.7 presents the geographical distribution of patent activity across quantum
technology platforms, highlighting differences in the relative positions of major regions. US
applicants account for the largest shares of patenting activity in five of the seven technology
families. European applicants lead in semiconductor-based spin qubits and diamond/NV
centres, while also maintaining a substantial presence in neutral-atom technologies.
Table 11.7. Patent mapping by technology family and geographical share
Geographical shares were calculated based on applicant-country instances, meaning that
patents involving applicants from multiple countries may contribute to several geographical
categories. For the purposes of the analysis, Europe includes the EU27, the United Kingdom,
Switzerland, Norway and Iceland.
Technology Family Total
patents
Europe’s
share (%)
US share
(%)
CN share
(%)
JP/KR
share (%)
Other
(%)
Superconducting circuits 1741 18.8% 56.9% 6.5% 10.1% 7.7%
Trapped ions 706 30.0% 53.2% 4.7% 7.5% 4.5%
Neutral atoms 199 36.8% 48.9% 1.5% 7.8% 5.0%
Semiconductors / spin qubits 155 48.8% 19.1% 1.3% 5.2% 25.6%
Photonics qubits 198 29.3% 41.4% 4.0% 10.7% 14.6%
Diamond / NV centres 361 36.1% 30.6% 2.4% 16.6% 14.2%
Quantum metrology 347 20.3% 49.3% 10.5% 14.7% 5.2%
140
74. STANDARDISATION IN QUANTUM TECHNOLOGIES
This section presents findings from the supporting PPMI/d-fine study on standardisation
activities in quantum technologies. The study maps 165 standardisation-related items
identified through a review of official websites and publications of European and
international standardisation organisations, national and regional cybersecurity agencies,
industry stakeholders and relevant research initiatives. The analysis covers quantum
computing and simulation, quantum sensing and metrology, quantum communication, and
post-quantum cryptography, examining the distribution of identified items by entity type,
thematic area, activity type and status, as well as the evolution of published standardisation
outputs over time.
74.0. STANDARDISATION EFFORTS BY THEMATIC AREA AND STATUS
Tables 11.7 and 11.8 present the distribution of the 165 mapped standardisation-related
items. Table 11.8 shows their distribution by entity type and thematic area, while Table 11.9
distinguishes between formal standards, pre-normative standardisation, de facto
standardisation and pre-standardisation research and development, according to their
respective status.
All
quantu
m
technolo
gies
Quantum
Computi
ng &
Simulatio
n
Quantum
Sensing
&
Metrolog
y
Quantum
Commun
ication
Post-
Quantum
Cryptogr
aphy
Hybrid
Quantum
Communica
tion and
PQC
Gran
d
Total
Corporate 1 6 4 11
European
Research
4 4 4 6 1 19
European
Standardisatio
n
6 10 4 19 20 3 62
Global
Standardisatio
n
5 5 2 47 4
63
Non-European
Standardisatio
n
10
10
Grand Total 12 25 10 70 44 4 165
Table 11.8. Standardisation efforts by entity type and thematic pillar
Published Under
Drafting
Planned Conclude
d
Ongoing Grand
Total
Formal standard 50 25 5 80
Pre-normative
standardisation/pre-
standard
44 4 4
52
De-facto standardisation 9 4 13
Pre-standardisation R&D 7 13 20
Grand Total 103 29 9 7 17 165
Table 11.9. Standardisation efforts by activity type and status
141
74.1. EVOLUTION OF PUBLISHED STANDARDISATION OUTPUTS
Table 11.10 presents the annual number of published standardisation outputs identified in
the mapping, including formal standards, pre-standards and de facto standardisation. The
data show an increase in published outputs in recent years, particularly in 2024 and 2025.
Data for 2026 cover only outputs identified at the time of the study.
Published Year Count
2010 3
2011 0
2012 0
2013 0
2014 1
2015 0
2016 3
2017 4
2018 3
2019 4
2020 5
2021 7
2022 10
2023 13
2024 22
2025 23
2026 5
Grand Total 103
Table 11.10. Published standardisation outputs per year
142
75. COMMERCIALISATION AND FINANCING OF QUANTUM COMPANIES
This section examines the commercialisation and financing of quantum technology
companies, drawing on findings from the JRC and the supporting PPMI/d-fine study. It
covers the market availability of quantum technology products, venture capital investment
across financing stages, the geographical origin of investors in large funding rounds, and
public procurement as a demand-side support mechanism.
75.0. COMMERCIALISATION STATUS OF EU QUANTUM COMPANIES
Tables 11.10 and 11.11 present findings from a JRC analysis conducted in May 2026 on a
sample of 140 EU-based quantum technology companies. The analysis examines whether
these companies had products available on the market, providing an indication of their
commercialisation status. Results are presented by Member State and quantum technology
segment.
The findings indicate that approximately 72% of the companies examined had products
available on the market, while 21% did not and the status of the remaining 7% was unclear.
Country No Unclear Yes Grand Total
AT 6 6
BE 1 1 2
BG 1 1
DE 8 26 34
DK 2 3 3 8
EE 1 1
ES 3 7 10
FI 1 8 9
FR 4 2 22 28
EL 1 1
IE 1 1
IT 5 1 7 13
NL 2 1 12 15
PL 1 1 6 8
PT 1 1
SE 1 1
SI 1 1
Grand Total 30 9 101 140
~21% ~7% ~72%
Table 11.11. Market availability of quantum technology products by Member State
Table 11.12 provides a further breakdown of product availability among EU quantum
technology companies by technology segment.
Products No Unclear Yes
Quantum sensing 28% 11% 61%
Quantum computing software 25% 7% 68%
Quantum computing hardware 26% 3% 71%
Quantum communication/key distribution 16% 4% 80%
Post-quantum cryptography 10% 5% 85%
Quantum control and metrology 0% 0% 100%
143
Quantum products for space 20% 0% 80%
Quantum chips 14% 14% 71%
Quantum random number generators 0% 40% 60%
Table 11.12. Commercialisation status of EU quantum technology companies by technology area (%)
Commercial readiness varies across technology domains, with the highest shares of firms
marketing products in post-quantum cryptography (85%) and quantum key distribution
(80%), compared with quantum sensing (61%) and quantum computing software and
hardware (68% and 71%, respectively).
75.1. VENTURE CAPITAL INVESTMENT BY FINANCING STAGE
Tables 11.12 and 11.13 present annual venture capital (VC) investments in quantum
technology companies by financing stage and location of the recipient company (EU27,
United States and rest of the world). The figures are based on a JRC analysis using
PitchBook data and are expressed in EUR million. While the annual data extend back to
2015, the aggregate comparisons cover the period 2020–2025.
75.1.1. Early-stage VC
Table 11.13 presents annual early-stage VC investments in quantum technology companies
by geographical location.
Early-stage VC Location of target Q company
EU27 US Rest
2015 0.7 71.9
2016 35.2 11.5
2017 165.0 5.6
2018 0.0 35.7 27.4
2019 16.8 36.4 74.6
2020 7.9 61.6 77.9
2021 81.8 85.0 295.3
2022 96.2 99.7 274.0
2023 219.2 10.8 117.9
2024 86.7 20.0 48.4
2025 17.5 24.7 5.3
total 2020-25 509.3 301.8 818.8
Table 11.13. Early-stage VC investments by location (EUR million)
75.1.2. Late-stage VC
Table 11.14 presents the corresponding figures for late-stage VC investments.
Late-stage VC Location of target Q company
EU27 US Rest
2015
2016
2017
2018 0.0
144
2019 35.4
2020 410.5 63.3
2021 430.0 128.1
2022 160.2 585.5 322.7
2023 84.7 24.9 334.1
2024 104.4 648.7 322.0
2025 144.2 124.6 49.7
total 2020-25 493.4 2,224.0 1,219.8
Table 11.14. Late-stage VC investments by location (EUR million)
75.2. LARGE FUNDING ROUNDS AND INVESTOR ORIGIN
This subsection presents findings from the supporting PPMI/d-fine study on large funding
rounds in quantum technology companies. The analysis covers 188 funding rounds,
classified by funding round size and geographical origin of investors.
Table 11.15 presents the distribution of the identified funding rounds by investor origin
across all quantum technology companies included in the study.
Funding Round Size Only EU
Investors
Mixed
Investors
Only
Non-EU
Investors
Investor
Origin
unknown
Total %
Large (>25M EUR) 13 7 58 17 95 100
Very Large (>50M EUR) 8 3 36 12 59 100
Extremely Large (>100M EUR) 3 3 18 10 34 100
Total 188
Table 11.15. Large funding rounds by investor origin considering all quantum companies
Table 11.16 provides the corresponding breakdown for EU-based quantum technology
companies.
Funding Round Size Only EU
Investors
Mixed
Investors
Only
Non-EU
Investors
Investor
Origin
unknown
Total %
Large (>25M EUR) 12 1 3 2 18 18.9%
Very Large (>50M EUR) 7 1 2 1 11 18.6%
Extremely Large (>100M EUR) 3 1 1 1 6 17.6%
Total 35
Table 11.16. Large funding rounds by investor origin considering EU-based quantum companies
75.3. DEMAND-SIDE SUPPORT AND PUBLIC PROCUREMENT
This subsection presents findings from the supporting PPMI/d-fine study on public
procurement initiatives supporting quantum technologies in the EU. The mapping covers
quantum computing systems, quantum communication infrastructure deployments and a
quantum key distribution microsatellite pilot mission.
Table 11.17 provides an overview of the identified procurement schemes, including the
types and numbers of quantum systems procured, their geographical scope and the buyers
involved.
145
Procurement scheme Country
/level
Quantum
systems
procured
Number
of distinct
buyers
Buyers identified Ref.
EuroHPC JU
quantum computer
acquisition
EU 8 8IT4Innovations, PSNC, FZ
Jülich, CEA/GENCI, LRZ,
CINECA, BSC, LuxProvide,
SURF.
1
HPCQS PPI EU + MS 2 2CEA/GENCI, FZ Jülich 2
DLR Quantum
Computing Initiative
(DLR QCI)
DE (MS) 11 1DLR 3
VTT FiQCI original
procurement (5→50
qubit)
FI (MS) 1 1VTT 4
VTT FiQCI new
procurement
(150→300 qubit)
FI (MS) 2 1VTT 5
EuroQCI national
deployment projects
(incl. CEF Digital
cross-border)
EU + 27
MS
27
national +
19 cross-
border + 6
industry
27 MS + 6
industry
Minimum 27 national
implementing bodies (NRENs,
telecom regulators, research
institutes). Actual count higher:
some projects have multiple
partners.
6
BMBF Quantum
Systems
DE (MS) 2 1LRZ 7
QuNorth / Magne
(Denmark quantum
computer
acquisition)
DK (MS) 1 2EIFO (quasi-public) + Novo
Nordisk Foundation
(private).+M15+M13
8
PROQCIMA
(French defence
quantum computer
programme)
FR (MS) 5 1DGA/French Ministry of Armed
Forces
9
Quantum Spain
(national quantum
computer
procurement)
ES (MS) 1 1BSC (Barcelona Supercomputing
Center) as host/operator.
10
IRIS² QKD
microsatellite pilot
mission
EU 1 1 DG CNECT 11
Table 11.17. Public procurement schemes supporting quantum technologies in the EU
The mapping identifies the procurement of 32 quantum computer prototypes, 52 quantum
communication infrastructure deployments and one microsatellite system. It also identifies
12 distinct buyers of quantum computer prototypes, 33 buyers of quantum communication
infrastructures, and one buyer of the microsatellite system.
1 EuroHPC JU, Consolidated Annual Activity Report 2022, p. 25 (quantum computer acquisition budgets of €8–10
million and 50% EuroHPC JU co-funding; see also EuroHPC JU Governing Board Decision No. 27/2022); EuroHPC JU,
Consolidated Annual Activity Report 2023, annex to Governing Board Decision No. 27/2024, p. 65 (quantum
infrastructure activities, hosting agreements, calls for expressions of interest and consortium arrangements); EuroHPC
JU, Consolidated Annual Activity Report 2024, annex to Governing Board Decision No. 24/2025, p. 6 (four procurement
contracts totalling €50,653,000, including an EU contribution of €22,826,500), pp. 43–44 (procurement activities) and
pp. 54–58 (quantum computer specifications). Reports available via the EuroHPC JU official document repository. 2 HPCQS Consortium, New EU Research Project HPCQS, project announcement
146
3 German Aerospace Center (DLR), Quantum Computers, DLR Quantum Computing Initiative; German Federal
Ministry for Economic Affairs and Climate Action, Quantum Computing in Germany, press release (2022); DLR,
Quantum Computers: Out of the Lab, into the World, news article (2023). 4 Finnish Ministry of Economic Affairs and Employment, Building of Finland’s First Quantum Computer Begins: VTT
Partners with Quantum Startup IQM, press release; Finnish Public Procurement Competence Centre, Procurement of a
Quantum Computer: Case VTT, case study; VTT Technical Research Centre of Finland, VTT and IQM Launch First 50-
Qubit Quantum Computer Developed in Europe, news release. 5 Finnish Ministry of Economic Affairs and Employment, Building of Finland’s First Quantum Computer Begins: VTT
Partners with Quantum Startup IQM, press release; Finnish Public Procurement Competence Centre, Procurement of a
Quantum Computer: Case VTT, case study; VTT Technical Research Centre of Finland, VTT and IQM Launch First 50-
Qubit Quantum Computer Developed in Europe, news release. 6 VTT Technical Research Centre of Finland, IQM Quantum Computers to Supply Finland with a World-Leading
Superconducting 300-Qubit Quantum Computer, news release. 7 European Health and Digital Executive Agency (HaDEA), European Quantum Communication Infrastructure
(EuroQCI), European Commission, programme overview. 8 German Federal Ministry of Research, Technology and Space, Q-Exa: Quantencomputer-Erweiterung durch Exa-Scale-
HPC, project profile (2021–2024); German Federal Ministry of Research, Technology and Space, MAQCS: Multikern
Atomare Quantencomputing Systeme, project profile (2023–2027); Quantum Computing Report, Denmark’s QuNorth to
Acquire 50 Logical Qubit Magne Quantum Computer from Atom Computing and Microsoft, industry news article. 9 Alice & Bob, French Government Taps Alice & Bob to Deliver Scalable Fault-Tolerant Systems with €500M in
Funding, press release (2024); The Quantum Insider, French Defense Agency to Award Startups €500 Million Plus to
Build Universal Quantum Computers, 9 March 2024. 10 European Commission, Quantum Spain: Spanish Supercomputing Network, Recovery and Resilience Facility project
overview; Qilimanjaro Quantum Tech, Successful First Delivery for the Quantum Spain Project to Build the First
Spanish Quantum Computer, company announcement; Barcelona Supercomputing Center (BSC-CNS), BSC Quantum
Spain Computer, project information. 11 European Commission, Directorate-General for Communications Networks, Content and Technology (DG CNECT),
IRIS² QKD Microsatellite Pilot Mission — Tender Specifications, procurement reference EC-CNECT/2025/OP/0129
(2025).
147
76. ACCESS TO QUANTUM TECHNOLOGY INFRASTRUCTURES
The tables below present aggregated findings from the supporting PPMI/d-fine study, which
mapped quantum technology infrastructures across the EU, including quantum computing,
communication and sensing testbeds, as well as pilot lines.
The findings indicate that only 18 of the 91 mapped testbeds were identified as offering
some form of access or potential access to start-ups, while 8 of the 27 mapped pilot lines
had identified access arrangements (Table 11.18). A substantial proportion of the mapped
infrastructures are either still planned or subject to restricted, project-based or unclear access
conditions.
Infrastructure category Total mapped
Accessible or
potentially
accessible
Restricted,
unclear or
unspecified
Planned
Quantum computing testbeds 49 12 11 26
Quantum communication testbeds 36 4 31 1
Quantum sensing testbeds 6 2 3 1
Total testbeds 91 18 45 28
Pilot lines 27 8 10 9
Total 118 26 55 37
Table 11.18. Accessibility of mapped quantum technology testbeds and pilot lines in the EU
As shown in Table 11.19, access modalities vary across infrastructure types, including paid
access, calls for applications, conditional access and national access arrangements. Access
to quantum computing testbeds is predominantly fee-based, whereas access to pilot lines is
mainly organised through calls for applications or national arrangements. These differences
illustrate that the availability of infrastructure does not necessarily translate into unrestricted
access for start-ups.
Access modality Quantum
computing
Quantum
communicati
on
Quantum
sensing Pilot lines
Total infrastructures mapped 49 36 6 27
Paid access 10 0 0 1
Call-based access 1 1 1 4
Conditional access 1 0 0 0
Open access 0 1 0 0
National access arrangements 0 0 0 3
Potential access through direct contact 0 2 1 1
Restricted, project-based or unclear access 9 31 3 9
Access not specified 2 0 0 0
Planned 26 1 1 9
Table 11.19. Access modalities for mapped quantum technology testbeds and pilot lines in the EU
148
77. SUPPLY CHAIN DEPENDENCIES AND VULNERABILITIES
This section presents findings from the supporting PPMI/d-fine study on EU supplier
availability, dependencies on non-EU sources and project extensions associated with supply
constraints in quantum technologies.
77.0. EU SUPPLIER AVAILABILITY FOR COMPONENTS AND SUBCOMPONENTS
The supporting PPMI/d-fine study assessed the availability of EU suppliers for 47 quantum
technology components and subcomponents. Table 11.20 presents the distribution of these
items according to whether no EU supplier, a single EU supplier or multiple EU suppliers
were identified.
Category No EU source Single EU source Multiple EU
sources
Total components
evaluated
Main components 3 1 27 31
Subcomponents 6 2 8 16
Total 9 3 35 47
Table 11.20. Availability of EU suppliers for quantum technology components and subcomponents
77.1. DEPENDENCIES ON NON-EU SOURCES BY TECHNOLOGY USE CASE
Table 11.21 presents the findings of the supporting study on dependencies on non-EU
sources across nine quantum technology use cases, distinguishing between dependencies
identified for main components alone and those identified when subcomponents are also
considered.
Use case Depends on non-EU
excluding sub-components
Depends on non-EU
including sub-components
Quantum Computing/Simulation
– Neutral atoms
TRUE TRUE
Quantum Computing/Simulation
– Ions
TRUE TRUE
Quantum Computing/Simulation
– Superconducting Qubits
TRUETRUE
Quantum Computing/Simulation
– Photons
FALSETRUE
Quantum Computing/Simulation
– Vacancy centres
FALSETRUE
Quantum Communication FALSETRUE
Quantum Sensing – Ions TRUETRUE
Quantum Sensing – Neutral atoms TRUETRUE
Quantum Sensing – Vacancy
centres
FALSETRUE
Use cases with non-EU dependencies 5 of 9 9 of 9
Table 11.21. Dependency on non-EU sources by quantum technology use case
77.2. PROJECT EXTENSIONS ASSOCIATED WITH SUPPLY CONSTRAINTS
The supporting study examined an illustrative sample of 23 quantum communication
projects to assess project extensions and their reported causes. Table 11.22 presents the
number and proportion of projects affected, distinguishing between predominantly
149
component- or supply-related constraints and administrative or regulatory factors, together
with the average extension duration.
Project status / reported cause Number of
projects
Share of
total
projects
Share of
extended
projects
Average
extension
(days)
Projects with extensions 11 48% 100%
Of which: predominantly component or
supply-related constraints 8 35% 73%
191
Of which: predominantly administrative
or regulatory factors 3 13% 27%
303
Projects completed on time 12 52% 0
Total projects examined 23 100%
Table 11.22. Project-level analysis of 23 quantum communication projects; percentages are rounded
In total 11 (48%) experienced extensions. Predominantly component- or supply-chain-
related constraints affected 8 of these projects (73%), with an average delay of
approximately 191 days, while the remaining 3 (27%) reported administrative or regulatory
factors, averaging 303 days.
EN EN
EUROPEAN COMMISSION
Brussels, 25.11.2026 SWD(2026) 966 final
COMMISSION STAFF WORKING DOCUMENT
EXECUTIVE SUMMARY OF THE IMPACT ASSESSMENT REPORT
Accompanying the document
Proposal for a Regulation of the European Parliament and of the Council
on a framework of measures for strengthening the Union's quantum ecosystem
(Quantum Act)
{COM(2026) 965 final} - {SEC(2026) 966 final} - {SWD(2026) 965 final} - {SWD(2026) 967 final}
1
1. Identification of the problem and EU-level dimension
Quantum technologies comprise quantum computing and simulation, quantum communication,
and quantum sensing and metrology. Europe has a strong scientific base, substantial public
investment and a dynamic start-up ecosystem. However, these strengths do not consistently
translate into deployable technologies, firms operating at industrial scale or resilient value
chains.
The impact assessment identifies three interrelated structural problems:
• Slow conversion of research excellence into deployable quantum technologies.
Fragmented efforts across the Union and the Member States mean that research results and
prototypes do not consistently progress into validated, manufacturable and operational
products and services.
• Insufficient conditions for European quantum firms to scale and for early markets
to develop. Firms struggle to secure continuous finance and reach industrial scale, while
demand remains too limited and fragmented to provide predictable revenue streams and
reference customers.
• Strategic dependencies and insufficient resilience in quantum value chains. The
Union relies on concentrated and, in some cases, non-EU sources for specialised
components and enabling technologies, while visibility and coordinated mitigation of
these dependencies remain limited.
These problems have a clear cross-border dimension. Research consortia, firms, investors,
facilities, suppliers and users operate across several Member States, while specialised
infrastructures have high fixed costs and cannot be replicated efficiently in every country.
Existing Union and national initiatives address parts of the ecosystem but do not provide a
durable framework connecting priorities, industrialisation infrastructures, finance, demand,
skills, trusted deployment and dependency monitoring.
2. Aim of the initiative
The Quantum Act aims to sustain the Union's scientific and technological leadership,
strengthen its competitiveness and industrial deployment capacity in quantum technologies,
and improve EU resilience, trusted and quantum-safe deployment and economic security.
It sets out to:
• improve EU and Member State alignment and delivery of research and innovation
priorities;
• accelerate lab-to-fab progression and access to shared industrialisation infrastructures;
• improve scale-up finance and financing continuity;
• stimulate demand, first-buyer opportunities and wider deployment;
• strengthen targeted skills and user support;
• support standards, benchmarking, testing and quantum-safe implementation; and
• improve the visibility, early warning and mitigation of critical dependencies.
Coordination and lab-to-fab measures respond to the slow conversion of research into
deployable technologies; finance, demand, skills and user support address the barriers to firm
2
and market scale-up; and trusted-deployment and dependency-monitoring measures strengthen
resilience.
3. Value added at EU level
Union action provides a common framework to coordinate priorities, pool demand and make
more effective use of specialised infrastructures and expertise across borders. It can create
economies of scale, reduce unnecessary duplication and provide firms with a larger and more
predictable market.
Common approaches to standards, benchmarking, testing and interoperability can reduce
uncertainty for firms and users. Coordinated strategic intelligence can also provide a more
complete picture of cross-border and multi-tier dependencies than Member States could obtain
individually. The initiative therefore delivers benefits beyond national action while preserving
Member State responsibilities and relying, wherever possible, on existing bodies and
instruments.
4. Options evaluated and preferred option
The impact assessment compares three policy options with a dynamic baseline under which
existing and sufficiently certain Union and national initiatives continue without an EU
Quantum Act.
• PO1, a Voluntary Horizontal Framework, relies mainly on non-binding coordination,
guidance and voluntary cooperation concerning infrastructures, investment, procurement,
skills, pre-standardisation and dependency mapping.
• PO2, an Enabling Quantum Framework Act, establishes structured EU and Member
State governance and delivery mechanisms, together with narrowly targeted obligations for
defined authorities, supported or designated actors and critical value-chain categories.
• PO3, a High-Intensity Targeted Intervention, supplements PO2 with stronger planning
and reporting requirements and more intensive measures concerning finance, strategic
demand, trusted deployment and resilience.
PO2 is the preferred option. Compared to the baseline, PO2 would provide a binding and
reliable EU-MS coordination framework, ensuring predictable pathways from research through
testing, finance and procurement to deployment, and systematic quantum-specific market and
dependency intelligence, while relying primarily on existing bodies and instruments. The
binding monitoring and coordination framework will ensure the full achievements of the
envisaged objectives eliminating uncertainties that come with a voluntary scheme.
5. Stakeholders' support
Stakeholders broadly support stronger European coordination, improved access to specialised
infrastructures and expertise, greater financing continuity, first-buyer pathways, skills
measures, standards support and better visibility of supply-chain risks. SMEs and start-ups
particularly stressed the need for affordable shared facilities, technical assistance and simple
and predictable procedures.
Views differed on the intensity of intervention. Some stakeholders called for stronger funding,
procurement or security measures, while others warned against premature certification, broad
3
sourcing restrictions, duplicative governance and recurrent reporting. PO2 reflects this balance
through targeted, proportionate and maturity-sensitive measures.
6. Benefits and costs of the preferred option
The preferred option is expected to generate economic, technological and strategic benefits
relative to the baseline, notably by accelerating the conversion of quantum research into
validated and deployable technologies, improve the use of European facilities and strengthen
continuity between grants, finance, industrialisation and demand. Common benchmarks,
testing methods and interoperability profiles should reduce uncertainty for companies,
investors, users and public buyers. Strategic intelligence and coordination of the existing post-
quantum cryptography roadmap should strengthen resilience and preparedness.
Under the preferred option, most costs would fall on the Commission, Union implementing
bodies, Member State authorities and operators of designated or Union-supported Hubs,
Competence and Acceleration Centres and other relevant facilities. Business-facing costs
would be limited to applicants, beneficiaries, designated projects and actors falling within
narrowly defined information requests.
To achieve the objectives of the Quantum Act, a bottom-up planning exercise suggests
indicative Union programme financing needs of around EUR 5.2-6.1 billion under the next
MFF (2028-2034). Depending on the level of Member State and industry participation in
specific actions, this could mobilise around EUR 12.9-18.1 billion in total direct programme
resources. The main spending areas would be scientific excellence and R&I, quantum
infrastructures and testing, pilot infrastructures, Strategic Projects and first deployments, and
skills and other horizontal ecosystem measures.
The assessment also points to wider sector financing needs of around EUR 50-60 billion,
mainly in equity. This includes up to EUR 4 billion for 20-40 start-ups, EUR 20-25 billion for
up to 50 scale-ups, and EUR 25-30 billion for large strategic projects and quantum foundries.
7. Impact on SMEs and competitiveness
The preferred option should enable positive impact for SMEs through improved access to
specialised facilities and expertise, finance, customers, procurement opportunities, testing,
standards support and skills. Fixed application, reporting, testing and procurement costs may
nevertheless affect smaller firms proportionately more, which would be offset by simplified
and staged procedures, technical assistance, common templates, proportionate thresholds,
secure once-only reuse of information and risk-based information requests.
For competitiveness, the initiative aims to turn Europe's scientific strength into industrial and
commercial leadership. Its impact will depend on whether improved coordination and access
are accompanied by sufficient investment, demand and effective use of facilities.
8. Other significant impacts
PO2 is expected to strengthen Europe's quantum skills base by linking training, mobility and
user support to infrastructures, strategic projects and procurement. It may support high-value
employment and wider uptake of quantum technologies. Transparent access rules, cross-border
services and targeted support for less-developed ecosystems should help broaden participation.
4
Environmental effects are expected to be limited overall but could be significant at individual
sites, where expanded activities may increase demand for electricity, cooling and water. Shared
facilities and cross-border access could reduce duplication. Project selection should therefore
consider utilisation, resource use, waste and mitigation measures. In the longer term, quantum
technologies may contribute to areas such as energy optimisation, climate modelling and
environmental sensing.
9. Follow-up
The Commission will monitor implementation and prepare a comprehensive evaluation five
years after the entry into force. The findings will inform future programme and budgetary
decisions and any proposal to simplify, expand, modify or discontinue individual measures.