Dokumendiregister | Transpordiamet |
Viit | 1.8-5/24/6414-1 |
Registreeritud | 15.04.2024 |
Sünkroonitud | 18.04.2024 |
Liik | Valjaminev kiri |
Funktsioon | 1.8 Rahvusvahelise koostöö korraldamine |
Sari | 1.8-5 Rahvusvaheline kirjavahetus lennundusohutuse küsimustes: ECAC, ICAO, EASA, Eurocontrol, State Letterid |
Toimik | 1.8-5/2024 |
Juurdepääsupiirang | Avalik |
Juurdepääsupiirang | |
Adressaat | 'DELL' ORTO Luca', LSSIP Support |
Saabumis/saatmisviis | 'DELL' ORTO Luca', LSSIP Support |
Vastutaja | Moonika Käst (Users, Lennundusteenistus, Lennuliiklusteeninduse ja lennuväljade osakond) |
Originaal | Ava uues aknas |
Hello!
As previously agreed, Estonia was using this time the e-signature possibility (in PDF format fail) and all our representators have signed the LSSIP 2023 WLA for now.
Please find signed Document in the attachment.
One version has 3 last pages with additional timestamp/document moving information on it and another is without timestamp additional information, but still with e-signatures.
I hope your IT will find it OK to use to prepare final publication, as needed.
And thanks again for all your help in this cycle!
Kind regards
Moonika KƤst
MET Senior Inspector
Air Traffic Services and Aerodrome Department
Mob +372 58134428
LƵƵtsa 5 / 11415 Tallinn (ATS/AD)
Valge 4 / 11413 Tallinn (ADMIN)
Estonian Transport Administration
LSSIP Year 2023 Estonia Working Level Agreed
LSSIP Year 2023 Estonia Working Level Agreed
Foreword
The EUROCONTROL Local Single Sky Implementa�on (LSSIP) is a long-standing process celebra�ng its 30th anniversary. Its main goal is to improve the overall streamlined planning process in avia�on and in ATM, allowing avia�on stakeholders to deploy the agreed set of technological and infrastructure evolu�ons in a �mely manner and put the new func�onali�es into opera�ons in an orchestrated way across Europe.
The usage of the common LSSIP+ tool to gather data from the ATM stakeholders is a very good showcase of our collec�ve efforts, EUROCONTROL and SDM, in advancing the European ATM Network in support of our opera�onal stakeholders, moving towards the single value chain.
The LSSIP process is con�nuously improving the planning and repor�ng accuracy and consistency. It ensures the regular monitoring of the implementa�on of all func�onali�es.
The opera�onal stakeholders are facing the challenges of traffic growth, capacity and constantly increasing sustainability requirements. The need to maintain a process and pla�orm for the European avia�on community which provides a visibility of their plans and progress within the agreed �meline is stronger than ever. The con�nuous engagement in the LSSIP process shows the commitment towards a robust unified planning and monitoring process of the European ATM modernisa�on.
The na�onal LSSIP documents not only provide a unified view of the plans and progress of implementa�on at both Na�onal and ECAC levels. They also form the core of the ICAO’s Avia�on System Block Upgrades (ASBUs) Implementa�on Monitoring Report within the ICAO EUR Region. Developed by EUROCONTROL on behalf of ICAO, it is based on the reported LSSIP data for all 55 ICAO/EUR States and informs at global level about the European progress of implementa�on of the Global Air Naviga�on Plan (GANP).
Moreover, star�ng this year, the EUR RASP ques�onnaire, a joint effort between the ICAO EUR Office and EASA, directly supported by EUROCONTROL, has been officially incorporated into the LSSIP mechanism, thereby enhancing the collabora�on between our organisa�ons.
I would like to thank all our stakeholders for their con�nued commitment and significant effort in contribu�ng to the LSSIP process, the produc�on of this LSSIP document and in suppor�ng EUROCONTROL towards our goal of diligently guiding and informing the Avia�on community on ATM deployment.
Enjoy reading! Iacopo Prissinotti Director NM - Network Manager EUROCONTROL
LSSIP Year 2023 Estonia Working Level Agreed
SESAR Deployment Manager Lookout
This document serves as a testament to our collec�ve efforts in advancing the European ATM Network, and a roadmap for the challenges that lie ahead. We can truly state that this is the result of ac�ng as one team for the modernisa�on of European avia�on.
The SESAR Deployment Programme progress informa�on, collected through the LSSIP+ tool, via the unified monitoring and repor�ng process is a cornerstone of this document and at the same �me directly supports the delivery of the SESAR Deployment Programme Monitoring View 2023.
This drives the re-direc�on of our work at SDM to guide and support the opera�onal stakeholders in their implementa�on efforts of CP1 to make sure the ATM industry is able to achieve the target goals. It gives SDM, since the first edi�on of the Monitoring View in 2015, the opportunity to iden�fy implementa�on risks and beter support stakeholders to accelerate deployment.
I would like to extend my gra�tude to all European organisa�ons involved and contribu�ng with data in LSSIP+ tool. As it is only through stakeholders' coopera�on, efforts and partnerships' spirit that we will keep pushing deployment forward within the European skies, avoiding delays in the adop�on of CP1 and building an ATM industry that can overcome the challenges of the upcoming years.
The two CP1 regulatory target deadlines already surpassed, and the approaching ones, underscore the urgency of our mission to beter support stakeholders to accelerate deployment. The significant progress achieved in the status of its implementa�on is living proof for the joint effort of ATM stakeholders throughout Europe.
Those deadlines serve as a reminder that our work is not just about mee�ng regulatory requirements, but about shaping the future of avia�on in Europe. Every objec�ve we complete, every milestone we achieve, brings us one step closer to that future.
As you dive into this document and SDP Monitoring View 2023, we hope it provides you with a clear understanding of our common journey so far and the path that lies ahead. We look forward to naviga�ng these challenges together, driven by our shared commitment to a safer, more efficient, and sustainable European sky. Mariagrazia La Piscopia Chief Strategy and Programme SESAR Deployment Manager
LSSIP Year 2023 Estonia Working Level Agreed
Document Title LSSIP Year 2023 for Estonia
Info Centre Reference <XX> (LSSIP Support)
Date of Edi�on <Date>
LSSIP Focal Point Moonika Käst – moonika.kast@transpordiamet.ee Estonian Transport Administra�on
LSSIP Contact Person Luca Dell’Orto – luca.dellorto@eurocontrol.int EUROCONTROL/NMD/INF/PAS
LSSIP Support Team lssip.support@eurocontrol.int
Status Ini�al Dra�
Intended for EUROCONTROL Stakeholders
Available in htps://www.eurocontrol.int/service/local-single-sky-implementa�on- monitoring
Reference Documents
LSSIP Documents htps://www.eurocontrol.int/service/local-single-sky-implementa�on- monitoring
Master Plan Level 3 – Plan Edi�on 2023
htps://www.eurocontrol.int/publica�on/european-atm-master-plan- implementa�on-plan-level-3
Master Plan Level 3 – Report Year 2023
htps://www.eurocontrol.int/publica�on/european-atm-master-plan- implementa�on-report-level-3
European ATM Portal htps://www.atmmasterplan.eu/
STATFOR Forecasts htps://www.eurocontrol.int/sta�or
Na�onal AIP https://aim.eans.ee
LSSIP Year 2023 Estonia Working Level Agreed
Approval Sheet
The following authorities have approved all parts of the LSSIP Year 2023 document, and the signatures confirm the correctness of the reported information and reflect the commitment to implement the actions laid down in the European ATM Master Plan Level 3 (Implementation View) – Edition 2023.
Stakeholder / Organisation
Name Position Signature and date
Estonian Transport Administration
Üllar Salumäe Director of Aviation Division
Estonian Air Naviga�on Services
Ivar Värk Chairman of Management Board and CEO
Estonian Air Force Toomas Susi
Active Commander of the Estonian Air Force Brigadier General
AS Tallinna Lennujaam Riivo Tuvike Chairman of Management Board
Estonian Environment Agency
Taimar Ala Director General
Üllar Salumäe (Apr 11, 2024 10:53 GMT+3) Üllar Salumäe
Ivar Värk, CEO EANS (Apr 11, 2024 13:08 GMT+3)
Toomas Susi (Apr 11, 2024 14:29 GMT+3) Toomas Susi
Riivo Tuvike (Apr 15, 2024 16:31 GMT+3) Riivo Tuvike
Taimar Ala (Apr 15, 2024 16:44 GMT+3) Taimar Ala
LSSIP Year 2023 Estonia Working Level Agreed
Table of Contents
EXECUTIVE SUMMARY ........................................................................................................................................ 1
HIGH LEVEL STATS DASHBOARD ........................................................................................................................................ 1 TRAFFIC AND CAPACITY ................................................................................................................................................... 2 IMPLEMENTATION SUMMARY ........................................................................................................................................... 3
Summary of the implementation of the objectives ............................................................................................... 3 Other 2023 developments: .................................................................................................................................... 3
INTRODUCTION .................................................................................................................................................. 4
1 NATIONAL IMPLEMENTATION VIEW ............................................................................................................. 5
1.1 NATIONAL ATM SCOPE ...................................................................................................................................... 5 International Membership .................................................................................................................................... 5 Estonia is part of: .................................................................................................................................................. 5 Main National Stakeholders .................................................................................................................................. 6
1.2 IMPLEMENTATION VIEWS .................................................................................................................................... 7 Progress per SESAR Phase ..................................................................................................................................... 7 Progress per SESAR Essential Operational Changes and Phase............................................................................. 8 Objective Progress per SESAR Essential Operational Changes .............................................................................. 9 ICAO ASBU Implementation Progress – Blocks 0 and 1 ....................................................................................... 13 ICAO ASBU Implementation Progress .................................................................................................................. 14 Overall situation of Implementation Objectives .................................................................................................. 18
TRAFFIC AND CAPACITY .................................................................................................................................... 24
1.3 NATIONAL ATM STRUCTURE ............................................................................................................................. 24 Geographical description of the FIR(s) ................................................................................................................ 24 Airspace Classification and Organisation ............................................................................................................ 25
EVOLUTION OF TRAFFIC IN ESTONIA ................................................................................................................................ 26 TALLINN ACC.............................................................................................................................................................. 27
Traffic and en-route ATFM delays 2019-2029 ..................................................................................................... 27 2023 performance ............................................................................................................................................... 27 Planning Period – Summer 2024-2029 ................................................................................................................ 28
2 NATIONAL ATM ENVIRONMENT ................................................................................................................ 30
MAIN NATIONAL STAKEHOLDERS .................................................................................................................................... 30 Civil Regulator(s) ................................................................................................................................................. 30 Airports ................................................................................................................................................................ 33 Meteorological Service Providers ........................................................................................................................ 34 Military Authorities ............................................................................................................................................. 34
3 IMPLEMENTATION PROJECTS ..................................................................................................................... 38
3.1 NATIONAL PROJECTS ......................................................................................................................................... 38 3.2 FAB PROJECTS ................................................................................................................................................. 39 3.3 MULTINATIONAL PROJECTS ................................................................................................................................ 39
4 COOPERATION ACTIVITIES ......................................................................................................................... 40
4.1 FAB COORDINATION ........................................................................................................................................ 40 4.2 MULTINATIONAL COOPERATION INITIATIVES ......................................................................................................... 40
LSSIP Year 2023 Estonia Working Level Agreed
5 DETAILED OBJECTIVES IMPLEMENTATION PROGRESS ................................................................................. 42
Main Objectives ................................................................................................................................................... 42 Additional Objectives for ICAO ASBU Monitoring ............................................................................................... 64 Local Objectives ................................................................................................................................................... 66
ANNEX A: SPECIALISTS INVOLVED IN THE ATM IMPLEMENTATION REPORTING FOR ESTONIA ............................. 72
ANNEX B: QUESTIONNAIRES ............................................................................................................................. 73
1. SURVEILLANCE (SUR) QUESTIONNAIRE ..................................................................................................................... 73 2. EAPAIRR AND GAPPRE QUESTIONNAIRE ................................................................................................................. 74 3. SESAR SOLUTIONS IMPLEMENTED IN A VOLUNTARY WAY .............................................................................................. 75
ANNEX C: IMPLEMENTATION OBJECTIVES’ LINKS WITH OTHER PLANS ............................................................... 76
ANNEX D: NATIONAL STAKEHOLDERS ORGANISATION CHARTS ............................................................................. 86
ANNEX E: GLOSSARY OF TERMS ........................................................................................................................ 91
LSSIP Year 2023 Estonia 1 Working Level Agreed
Execu�ve Summary
High Level Stats dashboard
LSSIP Year 2023 Estonia 2 Working Level Agreed
Traffic and Capacity
Level of traffic compared to 2019.
Summer En-Route Delay Tallinn ACC
Forecast between 2024-2029
2022 2023 N/A
65%
2.7% 2024-2029
LSSIP Year 2023 Estonia 3 Working Level Agreed
Implementation Summary
Summary of the implementa�on of the objec�ves
The introduc�on of a new Voice Communica�on System was a major project, which was finalised by the first half of 2023 and contributed to the comple�on of Objec�ves COM11.1 and COM11.2.
The Objec�ve FCM04.2 Enhanced Short Term ATFCM Measures was fully completed.
All the SWIM related Objec�ves are planned or ongoing, but there are foreseen delays in implementa�on due to complex ATM systems. Nevertheless, in 2023 several AIS ac�vi�es were carried out, which contribute to the implementa�on of digital NOTAM Service. EANS is also par�cipa�ng in project ACADIA (Accelera�on of Aeronau�cal Digital Informa�on Availability) to ensure accordance.
ITY-ACID Aircra� Iden�fica�on is s�ll ongoing with an implementa�on date later than the FOC date due to a delay of neighbouring ANSP-s implementa�on plans.
The local Objec�ve AOP14.1 Remote Tower Services first stage was fully implemented and is envisaged to be completed for the next aerodrome (EEKE) by 2024.
Other 2023 developments:
- Installation of new meteorological systems at EEKA, EEKE, EETN and EETU AD is finished. Certification process is ongoing.
- Implementation of CAT II at Tallinn Airport is ongoing. - Changes in governmental system. Estonian Transport Administration and Environment
Agency moved into area of Ministry of Climate.
Implemen�ng progress of AOM13.1, INF07 has gone very slowly due to constant lack of human resources in Estonian Transport Administra�on.
LSSIP Year 2023 Estonia 4 Working Level Agreed
Introduc�on
The Local Single Sky ImPlementa�on (LSSIP) documents, as an integral part of the Master Plan (MP) Level 3 (L3)/LSSIP mechanism, cons�tute a short/medium term implementa�on plan containing ECAC+ States’ ac�ons to achieve the Implementa�on Objec�ves as set out by the MP Level 3 and to improve the performance of their na�onal ATM System. This LSSIP document describes the situa�on in the State at the end of December 2023, together with plans for the next years.
Chapter 1 provides an overview of the na�onal ATM scope within the State, which is relevant for the implementa�on ac�vi�es, as well as an overview of the planning ac�vi�es by providing different charts on the progress reported by the different stakeholders.
Chapter 2 provides a comprehensive picture of the situa�on of Air Traffic, Capacity and ATFM Delay per each ACC in the State. It shows the evolu�on of Air Traffic and Delay in the last five years and the forecast for the next five years. It also presents the achieved performance in terms of delay during the summer season period and the planned projects assumed to offer the required capacity which will match the foreseen traffic increase and keep the delay at the agreed performance level.
Chapter 3 provides an overview of the ATM ins�tu�onal arrangements within the State. Chapter 4 provides the main Implementa�on Projects which contribute directly to the implementa�on of the MP Opera�onal Improvements and/or Enablers and Implementa�on Objec�ves. The LSSIP document covers a high-level list of the projects showing the applicable links. All other details like descrip�on, �mescale, progress made and expected contribu�on to the ATM Key Performance Areas provided by the State per each project are available in the LSSIP DB (extrac�on can be asked to LSSIP FP or LSSIP CP).
Chapter 5 deals with other coopera�on ac�vi�es beyond Implementa�on Projects. It provides an overview of the FAB coopera�on, as well as all other mul�na�onal ini�a�ves, which are out of the FAB scope. The content of this chapter generally is developed and agreed in close coopera�on between the States concerned.
Chapter 6 provides the high-level informa�on on progress and plans of each Implementa�on Objec�ve. The informa�on for each Implementa�on Objec�ve is presented in boxes giving a summary of the progress and plans of implementa�on for each Stakeholder. The conven�ons used are presented at the beginning of the sec�on.
The information contained in Chapter 6 – Implementation Objectives Progress is deemed sufficient to satisfy State reporting requirements towards ICAO in relation to ASBU (Aviation System Block Upgrades) monitoring.
LSSIP Year 2023 Estonia 5 Working Level Agreed
1 Na�onal Implementa�on View
1.1 Na�onal ATM Scope
Interna�onal Membership
Estonia is a member of the following interna�onal organisa�ons in the field of ATM:
Organisa�on Since Organisa�on Since
2015
2004
1995
2004
1992
2004
2004
1992
1992
Estonia is part of: The North European Func�onal Airspace Block (NEFAB).
In 2023 the GDP decreased by 3,5%, the forecast for 2024 is about 0,4% of deficiency. Main airport covered by LSSIP: EETN AD.
Number of national projects: 4 Number of FAB projects: NIL Number of multinational projects: 3
LSSIP Year 2023 Estonia 6 Working Level Agreed
Main Na�onal Stakeholders
The main National Stakeholders involved in ATM in Estonia are the following:
- Ministry of Climate;
- Ministry of Economic Affairs and Communica�ons;
- Ministry of Defence;
- Estonian Transport Administration;
- Estonian Air Navigation Services (EANS);
- Estonian Environment Agency;
- Estonian Defence Forces Air Force;
- AS Tallinna Lennujaam.
Their activities are detailed in the following subchapters and their relationships are shown in the diagram below.
LSSIP Year 2023 Estonia 7 Working Level Agreed
1.2 Implementa�on Views
Progress per SESAR Phase
The figure below shows the progress made so far in the implementation of objectives stemming from different R&D phases (Pre-SESAR, SESAR1 and SESAR 2020).
It shows the average implementation progress for all objectives grouped by SESAR Phase, excluding those for which the State is outside the applicability area as defined on a yearly basis in the European ATM Master Plan (Level 3) 2023, i.e., disregarding the declared “NOT APPLICABLE” LSSIP progress status.
Source: EUROCONTROL LSSIP+ DB
LSSIP Year 2023 Estonia 8 Working Level Agreed
Progress per SESAR Essen�al Opera�onal Changes and Phase
The figure below shows the progress made so far, per SESAR Essential Operational Changes, in the implementation of the SESAR phases. The percentages are calculated as an average, per EOC, of the same objectives as in the previous paragraph.
Source: EUROCONTROL LSSIP+ DB
LSSIP Year 2023 Estonia 9 Working Level Agreed
Objec�ve Progress per SESAR Essen�al Opera�onal Changes
LSSIP Year 2023 Estonia 10 Working Level Agreed
No implementa�on objec�ves are available yet for this EOC.
LSSIP Year 2023 Estonia 11 Working Level Agreed
LSSIP Year 2023 Estonia 12 Working Level Agreed
No implementa�on objec�ves are available yet for this EOC. Source: EUROCONTROL LSSIP+ DB
LSSIP Year 2023 Estonia 13 Working Level Agreed
ICAO ASBU Implementa�on Progress – Blocks 0 and 1
The figure below shows the progress made so far in the implementation of the ICAO ASBU Blocks 0 and 1, according to ICAO Global Air Navigation Plan 7th Edition (2022). The overall percentage is calculated as an average of the relevant Objectives contributing to each of the relevant ASBU Blocks; this is a summary of the table explained on the next page – ICAO ASBU Implementation Progress.
Source: EUROCONTROL LSSIP+ DB
LSSIP Year 2023 Estonia 14 Working Level Agreed
ICAO ASBU Implementa�on Progress
The tables below show for each ASBU Elements belonging to a particular ASBU Thread and Block, the overall status, the final date foreseen for completion and the percentage of progress achieved in the current cycle.
The set of Block 0 and Block 1 ASBU elements to be monitored in ICAO EUR Region has been approved through written consultation by European Aviation System Planning Group (EASPG) in April 2021, based on the conclusions of the EUR Global Air Navigation Plan (GANP) Transition Project Team. The set of monitored Elements has been subsequently amended following the publication of the 7th version of the GANP, endorsed in October 2022.
Results below were determined using the LSSIP Year 2023 declared statuses and progress of the relevant Implementation objectives in accordance with the updated mapping.
Note: Only the ASBU elements that are linked to an active implementation Objective are shown
Source: EUROCONTROL LSSIP+ DB
LSSIP Year 2023 Estonia 15 Working Level Agreed
ATM Deployment Outlook
State Objec�ves
Deployed in 2023
- Interac�ve Rolling NOP
[FCM10] 100 % progress
- Improve Runway Safety by Preven�ng Runway Excursions
[SAF11.1] 100 % progress
- Collabora�ve Flight Planning
[FCM03] 100 % progress
- Voice over Internet Protocol (VoIP) in En-Route
[COM11.1] 100 % progress
- Voice over Internet Protocol (VoIP) in Airport/Terminal
[COM11.2] 100 % progress
- Enhanced Short Term ATFCM Measures
[FCM04.2] 100 % progress
- Automated Support for Traffic Complexity Assessment and Flight Planning interfaces
[FCM06.1] 100 % progress
By 2024
- Aeronau�cal Informa�on Exchange - Airspace Reserva�on (ARES)
[INF10.5] 3 % progress
- Harmonise Opera�onal Air Traffic (OAT) and General Air Traffic (GAT) Handling
[AOM13.1] 56 % progress
- Aircra� Iden�fica�on
[ITY-ACID] 92 % progress
Source: EUROCONTROL LSSIP+ DB
LSSIP Year 2023 Estonia 16 Working Level Agreed
By 2025
- Aeronau�cal Informa�on Exchange - Aerodrome mapping service
[INF10.7] 0 % progress
- Aeronau�cal Informa�on Exchange - Aeronau�cal Informa�on Features service
[INF10.8] 8 % progress
- Meteorological Informa�on Exchange - Aerodrome Meteorological informa�on Service
[INF10.10] 47 % progress
- Electronic Terrain and Obstacle Data (eTOD)
[INF07] 6 % progress
- Stakeholders’ SWIM PKI and cyber security
[INF10.2] 13 % progress
- Meteorological Informa�on Exchange - Network Meteorological Informa�on
[INF10.12] 0 % progress
- Aeronau�cal Informa�on Exchange – Digital NOTAM service
[INF10.6] 64 % progress
- Meteorological Informa�on Exchange - Volcanic Ash Mass Concentra�on informa�on service
[INF10.9] 3 % progress
- Meteorological Informa�on Exchange - En-Route and Approach Meteorological informa�on service
[INF10.11] 5 % progress
Source: EUROCONTROL LSSIP+ DB
By 2027+
- Flight Informa�on Exchange (Yellow Profile) - Data Publica�on Service
[INF10.21] 0 % progress
- Flight Informa�on Exchange (Yellow Profile) - No�fica�on Service
[INF10.20] 0 % progress
- Implement measures to reduce the risk to aircra� opera�ons caused by airspace infringements
[SAF10.1] 30 % progress
- Flight Informa�on Exchange (Yellow Profile) - Flight Data Request Service
[INF10.19] 0 % progress
Source: EUROCONTROL LSSIP+ DB
Airport Objec�ves Tallinn Airport
Deployed in 2023
- Con�nuous Descent Opera�ons (CDO)
[ENV01] 100 % progress
LSSIP Year 2023 Estonia 17 Working Level Agreed
By 2024
- Remote Tower Services
[AOP14.1] 40 % progress
- RNAV 1 in TMA Opera�ons
[NAV03.1] 97 % progress
Source: EUROCONTROL LSSIP+ DB
By 2027+
- Airport Collabora�ve Decision Making (A-CDM)
[AOP05] 1 % progress
Source: EUROCONTROL LSSIP+ DB
LSSIP Year 2023 Estonia 18 Working Level Agreed
Overall situa�on of Implementa�on Objec�ves
Main Objec�ves Topic Progress at the end of
2023 Status 2023 2024 2025 2026 2027 2028
2029 >2029
AOM13.1 Harmonise Opera�onal Air Traffic (OAT) and General Air Traffic (GAT) Handling
56% Ongoing
AOM19.4 Management of Predefined Airspace Configura�ons
100% Completed
AOM19.5 ASM and A-FUA 100% Completed AOM21.1 Direct Rou�ng 0% Not Applicable AOM21.2 Ini�al Free Route Airspace 100% Completed AOM21.3 Enhanced Free Route Airspace Opera�ons 100% Completed *
AOP04.1(EETN) Advanced Surface Movement Guidance and Control System A-SMGCS Surveillance
Service (former ICAO Level 1)
100% Completed
AOP04.2(EETN) Advanced Surface Movement Guidance and Control System (A-SMGCS) Runway Monitoring and Conflict Aler�ng (RMCA) (Airport Safety Support Service = former
ICAO Level 2)
100% Completed *
AOP05(EETN) Airport Collabora�ve Decision Making (A- CDM)
1% Ongoing
AOP10(EETN) Time-Based Separa�on 0% Not Applicable * AOP11.1(EETN) Ini�al Airport Opera�ons Plan 0% Not Applicable * AOP11.2(EETN) Extended Airport Opera�ons Plan 0% Not Applicable * AOP12.1(EETN) Airport Safety Nets 0% Not Applicable * AOP13(EETN) Automated Assistance to Controller for
Surface Movement Planning and Rou�ng 0% Not Applicable *
AOP14.1(EETN) Remote Tower Services 40% Ongoing 2030 AOP15 Enhanced traffic situa�onal awareness
and airport safety nets for the vehicle drivers
0% Not Applicable 2030
AOP16 Guidance assistance through airfield ground ligh�ng
0% Not Applicable 2030
LSSIP Year 2023 Estonia 19 Working Level Agreed
Main Objec�ves Topic Progress at the end of
2023 Status 2023 2024 2025 2026 2027 2028
2029 >2029
AOP17 Provision/integra�on of departure planning informa�on to NMOC
0% Not Applicable 2030
AOP18 Runway Status Lights (RWSL) 0% Not Applicable 2030 AOP19(EETN) Departure Management Synchronised
with Pre-departure sequencing 0% Not Applicable
AOP21 Wake Turbulence Separa�ons for Arrivals based on Sta�c Aircra� Characteris�cs (S-
PWS-A)
0% Not Applicable 2030
AOP23(EETN) Integrated runway sequence for full traffic op�miza�on on single and mul�ple
runway airports
0% Not yet planned 2030
AOP25(EETN) De-icing management tool 0% Not yet planned 2030 AOP26 Reduced separa�on based on local
Runway Occupancy Time (ROT) characterisa�on
0% Not Applicable 2030
ATC02.2 Implement ground based safety nets - Short Term Conflict Alert (STCA) - level 2
for en-route opera�ons
100% Completed
ATC02.8 Ground-Based Safety Nets 100% Completed ATC02.9 Short Term Conflict Alert (STCA) for TMAs 100% Completed
ATC07.1(EETN) AMAN Tools and Procedures 0% Not Applicable ATC12.1 Automated Support for Conflict Detec�on,
Resolu�on Support Informa�on and Conformance Monitoring
100% Completed
ATC15.1 Informa�on Exchange with En-route in Support of AMAN
100% Completed
ATC15.2(EETN) Arrival Management Extended to En-route Airspace
0% Not Applicable *
ATC16 Implement ACAS II compliant with TCAS II change 7.1
100% Completed
ATC18 Mul�-Sector Planning En-route - 1P2T 0% Not Applicable 2030 ATC19(EETN) AMAN/DMAN Integra�on 0% Not Applicable *
LSSIP Year 2023 Estonia 20 Working Level Agreed
Main Objec�ves Topic Progress at the end of
2023 Status 2023 2024 2025 2026 2027 2028
2029 >2029
ATC20 Enhanced STCA with down-linked parameters via Mode S EHS
0% Not Applicable 2030
ATC23 Ini�al Air-Ground Trajectory Informa�on Sharing (Ground Domain)
0% Not yet planned *
ATC25 Ini�al Trajectory Informa�on Sharing ground distribu�on
0% Not yet planned *
ATC26(EETN) Point Merge in complex TMA 0% Not Applicable 2030 COM10.1 Migrate from AFTN to AMHS (Basic
service) 100% Completed
COM10.2 Extended AMHS 100% Completed * COM11.1 Voice over Internet Protocol (VoIP) in En-
Route 100% Completed
COM11.2 Voice over Internet Protocol (VoIP) in Airport/Terminal
100% Completed *
COM12 New Pan-European Network Service (NewPENS)
100% Completed *
COM13 Air Traffic Services (ATS) datalink using SatCom Class B
0% Not yet planned 2030
ENV01(EETN) Con�nuous Descent Opera�ons (CDO) 100% Completed * ENV02(EETN) Airport Collabora�ve Environmental
Management 100% Completed 2030
ENV03(EETN) Con�nuous Climb Opera�ons (CCO) 0% Not Applicable 2030 FCM01 Implement enhanced tac�cal flow
management services 100% Completed
FCM03 Collabora�ve Flight Planning 100% Completed FCM04.2 Enhanced Short Term ATFCM Measures 100% Completed FCM06.1 Automated Support for Traffic Complexity
Assessment and Flight Planning interfaces 100% Completed
FCM10 Interac�ve Rolling NOP 100% Completed * FCM11.1(EETN) Ini�al AOP/NOP Informa�on Sharing 0% Not Applicable * FCM11.2(EETN) AOP/NOP integra�on 0% Not Applicable *
INF07 Electronic Terrain and Obstacle Data 6% Ongoing
LSSIP Year 2023 Estonia 21 Working Level Agreed
Main Objec�ves Topic Progress at the end of
2023 Status 2023 2024 2025 2026 2027 2028
2029 >2029
(eTOD) INF10.10 Meteorological Informa�on Exchange -
Aerodrome Meteorological informa�on Service
47% Ongoing *
INF10.11 Meteorological Informa�on Exchange - En-Route and Approach Meteorological
informa�on service
5% Ongoing *
INF10.12 Meteorological Informa�on Exchange - Network Meteorological Informa�on
0% Planned *
INF10.13 Coopera�ve Network Informa�on Exchange - ATFCM Tac�cal Updates
Service (Airport Capacity and Enroute)
0% Not Applicable *
INF10.14 Coopera�ve Network Informa�on Exchange – Flight Management Service
(Slots and NOP/AOP integra�on)
0% Not Applicable *
INF10.15 Coopera�ve Network Informa�on Exchange – Measures Service (Traffic
Regula�on)
0% Not Applicable *
INF10.16 Coopera�ve Network Informa�on Exchange - Short Term ATFCM Measures
services (MCDM, eHelpdesk, STAM measures)
0% Not Applicable *
INF10.17 Coopera�ve Network Informa�on Exchange – Counts service (ATFCM
Conges�on Points)
0% Not Applicable *
INF10.19 Flight Informa�on Exchange (Yellow Profile) - Flight Data Request Service
0% Planned *
INF10.2 Stakeholders’ SWIM PKI and cyber security
13% Ongoing *
INF10.20 Flight Informa�on Exchange (Yellow Profile) - No�fica�on Service
0% Planned *
INF10.21 Flight Informa�on Exchange (Yellow Profile) - Data Publica�on Service
0% Planned *
LSSIP Year 2023 Estonia 22 Working Level Agreed
Main Objec�ves Topic Progress at the end of
2023 Status 2023 2024 2025 2026 2027 2028
2029 >2029
INF10.23 Flight Informa�on Exchange (Yellow Profile) - Extended AMAN SWIM Service
0% Not Applicable *
INF10.3 Aeronau�cal Informa�on Exchange - Airspace structure service
100% Completed *
INF10.4 Aeronau�cal Informa�on Exchange - Airspace Availability Service
100% Completed *
INF10.5 Aeronau�cal Informa�on Exchange - Airspace Reserva�on (ARES)
3% Ongoing *
INF10.6 Aeronau�cal Informa�on Exchange – Digital NOTAM service
64% Ongoing *
INF10.7 Aeronau�cal Informa�on Exchange - Aerodrome mapping service
0% Ongoing *
INF10.8 Aeronau�cal Informa�on Exchange - Aeronau�cal Informa�on Features service
8% Ongoing *
INF10.9 Meteorological Informa�on Exchange - Volcanic Ash Mass Concentra�on
informa�on service
3% Ongoing *
ITY-ACID Aircra� Iden�fica�on 92% Ongoing ITY-AGDL Ini�al ATC Air-Ground Data Link Services 100% Completed
ITY-AGVCS2 8,33 kHz Air-Ground Voice Channel Spacing below FL195
100% Completed
ITY-COTR Implementa�on of ground-ground automated co-ordina�on processes
100% Completed
ITY-FMTP Common Flight Message Transfer Protocol (FMTP)
100% Completed
NAV03.1(EETN) RNAV 1 in TMA Opera�ons 97% Ongoing 2030 NAV03.2(EETN) RNP 1 in TMA Opera�ons 0% Not Applicable 2030 NAV10(EETN) RNP Approach Procedures to instrument
RWY 100% Completed *
NAV11.1 Implement precision approach procedures using GBAS CAT II based on GAST C
0% Not Applicable 2030
NAV12 ATS IFR Routes for Rotorcra� Opera�ons 0% Not Applicable 2030
LSSIP Year 2023 Estonia 23 Working Level Agreed
Main Objec�ves Topic Progress at the end of
2023 Status 2023 2024 2025 2026 2027 2028
2029 >2029
SAF10.1 Implement measures to reduce the risk to aircra� opera�ons caused by airspace
infringements
30% Ongoing 2030
SAF11.1 Improve Runway Safety by Preven�ng Runway Excursions
100% Completed 2030
LEGEND:
* Full Operational Capability (FOC) date The Planned Implementation Date as reported in the LSSIP DB for each objective
LSSIP Year 2023 Estonia 24 Working Level Agreed
Traffic and Capacity
1.3 Na�onal ATM Structure
Geographical description of the FIR(s)
The geographical scope of this document addresses the Estonia ‘Tallinn Flight Information Region’ FIR:
Tallinn FIR is surrounded by FIRs of 4 States, namely Helsinki FIR and Helsinki TMA in the north, St. Petersburg FIR in the east, Riga FIR/TMA in the south and Sweden FIR-s in the west.
St. Petersburg belongs to the Russian Federation, a non- ECAC State.
The Control Area (CTA) covers the geographical limits of the Tallinn FIR from FL 95 up to FL 660. Control Zones (CTR-s) are implemented around 2 airports, namely Tallinn and Ämari (Military). In addition, there are Kärdla, Kuressaare, Pärnu and Tartu FIZ.
LSSIP Year 2023 Estonia 25 Working Level Agreed
Airspace Classification and Organisation
FIR: SFC - UNL
CTA: FL 95 - FL 660
In accordance with national regulations, only the Imperial System is used in Estonia.
ATC Units
The ATC units in the Estonian airspace, which are of concern to this LSSIP, are the following:
ATC Unit Number of sectors Associated FIR(s) Remarks
En-route TMA
TALLINN ATCC 2+1 1 Tallinn
CTA (Class C)
+ 1 Feeder sector suite operational regularly as from Nov 2005
Tallinn APP 1 Tallinn TMA Collocated with Tallinn ACC
LSSIP Year 2023 Estonia 26 Working Level Agreed
Evolu�on of Traffic in Estonia
2023 Traffic in Estonia increased by 5% compared to 2022 and recovery was at 65% of 2019.
2024-2029
The EUROCONTROL Seven-Year forecast predicts an average annual increase between 0.9% and 4.5% during the planning cycle, with an average baseline growth of 2.7%.
0
50000
100000
150000
200000
250000
2019 A 2020 A 2021 A 2022 A 2023 F 2024 F 2025 F 2026 F 2027 F 2028 F 2029 F
IF R
fli gh
ts
Estonia - Annual IFR Movements
IFR movements - Actuals
IFR movements - Base
IFR movements - High
IFR movements - Low
2020 A 2021 A 2022 A 2023 F 2024 F 2025 F 2026 F 2027 F 2028 F 2029 F
High . . . 6.8% 10.0% 4.0% 3.7% 3.4% 3.3% 2.6% Base -58% 13% 30% 6.1% 8.3% 1.7% 1.9% 1.7% 1.6% 1.0% Low . . . 5.4% 6.2% -0.5% 0.3% 0.0% 0.1% -0.5% High . . . 10% 9.1% 3.6% 3.4% 2.9% 2.7% 2.1% Base -55% 25% 48% 10% 6.9% 1.7% 2.0% 1.7% 1.7% 1.0% Low . . . 8.8% 5.9% -0.1% 0.5% 0.3% 0.4% -0.3%
EUROCONTROL Forecast Update 2023-2029 - October 2023
IFR Movements (Growth)
Estonia
ECAC
LSSIP Year 2023 Estonia 27 Working Level Agreed
Tallinn ACC
Traffic and en-route ATFM delays 2019-2029
2023 performance
Tallinn ACC
Traffic En-route Delay (min. per flight)
Capacity
2023 vs.2022
% of 2019 All reasons
ACC Reference
Value
Capacity Gap?
Baseline
Year +5% 63% 0.00 0.03 No
Summer +9% 66% 0.00 51
Summer 2023 performance assessment
The average delay per flight was zero in Summer 2023.
Opera�onal ac�ons Achieved Comments Review and analysis of exis�ng FRA connec�ng routes (FINEST AREA) Ongoing Pending FINEST state-level agreement
FINEST: review and update of necessary procedures Ongoing Pending FINEST state-level agreement
Bal�c three-state CIV-MIL mee�ngs Ongoing All military exercises in Bal�c Sea region are properly coordinated
Possible modifica�ons according to KPIs and customer feedback Ongoing
Moderniza�on of Tallinn TMA and CTR Ongoing CTR modernisa�on planned for spring 2024, and TMA modernisa�on to be launched during spring 2024
Dynamic sectorisa�on in Tallinn FIR Ongoing Simula�ons are ongoing to find addi�onal configura�ons for summer 2024, based on 2023 airblocks
Harmonized ATC procedures between Finland and Estonia Ongoing Pending FINEST state-level agreement FINEST: review and update of necessary ATM procedures Ongoing Pending FINEST state-level agreement
VCS update 23 MAR 2023 Yes
Maximum configura�on: 3 EETT / 10 FINEST* Yes *Pending FINEST state-level agreement
2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Peak Day Traffic 777 553 468 470 503 Summer Traffic 669 207 318 408 445 Yearly Traffic 605 253 288 365 382 Summer Traffic Forecast - Baseline 473 482 488 495 501 507 Summer Traffic Forecast - High 480 495 508 522 535 546 Summer Traffic Forecast - Low 465 465 466 467 466 465 Summer enroute delay (all causes) 0.01 0.00 0.00 0.00 0.00 Yearly enroute delay (all causes) 0.00 0.00 0.00 0.00 0.00
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0
100
200
300
400
500
600
700
800
900
En ro
ut e
De la
y (m
in ut
es p
er fl
ig ht
)
IF R
fli gh
ts (D
ai ly
A ve
ra ge
) EETTACC - Traffic and en-route ATFM delays
LSSIP Year 2023 Estonia 28 Working Level Agreed
Planning Period – Summer 2024-2029 The planning focuses on the summer season to reflect the most demanding period of the year from a capacity perspective. This approach ensures consistency with the previous planning cycles. The measures for each year are the measures that will be implemented before the summer season.
Summer Capacity Plan
2024 2025 2026 2027 2028 2029
Free Route Airspace Follow up of and possible modifica�ons to support ATFCM
Airspace Management Advanced FUA
FINEST: review and update of necessary procedures
Bal�c three-state CIV-MIL mee�ngs
Airport & TMA Network Integra�on Possible modifica�ons according to KPIs and customer feedback
Moderniza�on of Tallinn CTR
Moderniza�on of Tallinn TMA
Coopera�ve Traffic Management FINEST review and update as necessary
Common FMP for Estonia and Finland
Airspace
Dynamic Cross-border sectorisa�on Estonia/Finland
Dynamic sectorisa�on in
Tallinn FIR
FINEST: review and update of airspace as necessary a�er the FINEST implementa�on
Procedures Harmonized ATC procedures between Finland and Estonia
FINEST: review and update of necessary ATM procedures
Staffing ATCO cross border opera�ons between Finland and Estonia
Technical
ATM system upgrade and
interface with LARA (spring 2024)
Capacity
One configura�on for FINEST managed by common FMP
FINEST capacity based on CAPAN. Pending FINEST
cross-border service with 1FDP
FINEST capacity annual review. Pending FINEST cross-border service with 1FDP
Significant Events
Max sectors 4 EETT 4 EETT 10 FINEST*
4 EETT 10 FINEST*
4 EETT 10 FINEST*
4 EETT 10 FINEST*
4 EETT 10 FINEST*
Planned Annual Capacity Increase 3% 3% 3% 3% 3% 3%
Capacity Profile - Base Annual % Increase 0%
Capacity Plan v. Profile - Base 4%
Annual Reference Value (min) 0.02
Addi�onal informa�on * Pending FINEST cross-border service with 1FDP
LSSIP Year 2023 Estonia 29 Working Level Agreed
0
1
2
3
4
00 :0
0 01
:0 0
02 :0
0 03
:0 0
04 :0
0 05
:0 0
06 :0
0 07
:0 0
08 :0
0 09
:0 0
10 :0
0 11
:0 0
12 :0
0 13
:0 0
14 :0
0 15
:0 0
16 :0
0 17
:0 0
18 :0
0 19
:0 0
20 :0
0 21
:0 0
22 :0
0 23
:0 0
EETTCTA - May-October 2024
Nb sectors (std) Nb sectors (max)
2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2024-2029 Plan 53 55 57 59 61 63 2024-2029 Capacity Profile BASE 51 Capacity Baseline 67 36 40 51 51
0
10
20
30
40
50
60
70
80
Ca pa
ci ty
p ro
fil e
(m ov
em en
ts p
er h
ou r)
EETTCTA - Reference capacity profile
2024-2029 Outlook
No capacity issues are foreseen for Tallinn ACC for the period 2024-2029.
LSSIP Year 2023 Estonia 30 Working Level Agreed
2 Na�onal ATM Environment
Main Na�onal Stakeholders
Civil Regulator(s)
General Information Civil Aviation in Estonia is the responsibility of the Ministry of Climate. The different national entities having regulatory responsibilities in ATM are summarised in the table below. The Estonian Transport Administration is further detailed in the following sections.
Activity in ATM: Organisation responsible Legal Basis
Rulemaking Ministry of Climate Rulemaking: Ministry of Climate.
Statutes of Ministry of Climate
(Regulation of Government of the Republic of Estonia No 71 of 29. June 2023)
Safety Oversight The Estonian Transport Administration (Estonian NSA)
(From 01.01.2021)
Safety Oversight: Estonian Transport Administration
Aviation Act
Statutes of Estonian Transport Administration
(Regulation of the Minister of Economic Affairs and Infrastructure No 82 of 03. December 2020)
Enforcement actions in case of non-compliance with safety regulatory requirements
Estonian NSA Aviation Act
Statutes of Estonian Transport Administration
(Regulation of the Minister of Economic Affairs and Infrastructure No 82 of 03. December 2020)
Airspace Estonian NSA Aviation Act
Statutes of Estonian Transport Administration
(Regulation of the Minister of Economic Affairs and Infrastructure No 82 of 03. December 2020)
Economic MoEA&C Statutes of Ministry of Climate
(Regulation of Government of the Republic of Estonia No 71 of 29. June 2023)
Environment Ministry of Environment Statutes of Climate
(Regulation of Government of the Republic of Estonia No 71 of 29. June 2023)
Security Estonian NSA Aviation Act
Statutes of Estonian Transport Administration
(Regulation of the Minister of Economic Affairs and Infrastructure No 82 of 03. December 2020)
Accident investigation Estonian Safety Investigation Bureau (ESIB)
Aviation Act
Statues of Ministry of Economic Affairs and
LSSIP Year 2023 Estonia 31 Working Level Agreed
Communica�on
(Regula�on of Government of the Republic of Estonia No 323 of 10. December 2002)
Estonian Transport Administration
The Estonian Transport Administration (Estonian NSA) is in the jurisdiction of the Ministry of Climate, and it is the Estonian Safety Supervisory Authority, responsible for exercising state supervision over the compliance with the requirements deriving from legal acts regulating the field of activity of Estonian NSA. It has enforcement powers, and it is the extra-judicial body, which conducts proceedings in matters of misdemeanours. Estonian NSA participates in the drafting of legal acts concerning its area of activities, makes proposals on the amendments of those legal acts, such as the improvement of Estonian-language aviation terminology, participates in the development of policies, strategies, development plans, prepares and implements projects in its area of activities, including international projects. The Estonian NSA is institutionally separated from the Estonian Service Providers.
Annual Report published: Y Annual Safety report of 2023 has been published here.
National Civil Aviation Master Plan (CAMP):
N National CAMP is referenced in ICAO resolutions below:
• A39-23: No Country Left Behind (NCLB) Initiative (Draws the attention of Contracting States requesting technical cooperation and technical assistance to the advantages to be derived from well-defined projects based on civil aviation master plans)
• A39-25: Aviation’s contribution towards the United Nations 2030 Agenda for Sustainable Development (Urges Member States to enhance their air transport systems by effectively implementing SARPs and policies while at the same time including and elevating the priority of the aviation sector into their national development plans supported by robust air transport sector strategic plans and civil aviation master plans, thereby leading to the attainment of the SDGs)
• A39-26: Resource Mobilization (Requests the Secretary General to develop guidance material to assist States in including and elevating the priority of the aviation sector into their national development plans and developing robust air transport sector strategic plans and civil aviation master plans).
The Estonian Transport Administration website is: https://transpordiamet.ee/en
The organization chart is available in Annex D.
LSSIP Year 2023 Estonia 32 Working Level Agreed
Estonian Air Navigation Services - EANS
Service provided
In accordance with international standards the controlled airspace is divided into 3 air traffic control units to fulfil different tasks: Tower Control Unit, Approach Control Unit and Area Control Centre. In addition to these services the ATS units also provide alerting service and flight information service.
The services of EANS are:
- Provision of Air Traffic Service;
- Publication, exchange and dissemination of Aeronautical Information - Aeronautical Information Services;
- Technology: ATM Systems, Navigation, Radio Communication, Surveillance;
- Consultancy Services and expertise in the field of aviation;
- Development activities.
EANS
Governance: MoEA&C Ownership: 100% State (MoEA&C)
Services provided Y/N Comment
ATC en-route Y
ATC approach Y
ATC Aerodrome(s) Y Tallinn CTR.
AIS Y
CNS Y
MET N Estonian Environment Agency
ATCO training Y EANS provides OJT and complementary training.
Others Remote TWR (rAFIS) service in Tallinn for Tartu AD. There is a plan to start provision of the AFIS also at other Estonian regional airports by using Remote TWR (rAFIS) concept.
Additional information: -
Provision of services in other State(s):
N
Annual Report published: Y This is the annual report covering yearly activities of the ANSP.
Further information is available on the EANS website: http://www.eans.ee/en
The organisation chart is available in Annex D.
LSSIP Year 2023 Estonia 33 Working Level Agreed
ATC systems in use
Main ANSP part of any technology alliance1 Y FINEST
FDPS
Specify the manufacturer of the ATC system currently in use: Thales
Upgrade2 of the ATC system is performed or planned? Software and hardware upgrade planned 2024
Replacement of the ATC system by the new one is planned? Not planned
ATC Unit ACC/APP
SDPS
Specify the manufacturer of the ATC system currently in use: Thales
Upgrade of the ATC system is performed or planned? Software and hardware upgrade planned 2024
Replacement of the ATC system by the new one is planned? Not planned
ATC Unit ACC/APP
Airports
General information The main airports of Estonia: Tallinn, Tartu, Kuressaare, Kärdla, Pärnu airports, and Kihnu, Ruhnu airfields are operated by AS Tallinna Lennujaam. It is a 100% State owned stock company under the supervision of the Ministry of Climate.
Airport(s) covered by the LSSIP Referring to the List of Airports in the European ATM Master Plan Level 3 Implementation Plan Edition 2023– Annex 2, it is up to the individual State to decide which additional airports will be reported through LSSIP for those Objectives. The airport that is covered in this LSSIP is Tallinn Airport (non CP1).
https://airport.ee/en/corporate/lennart-meri-tallinn-airport-estonias-aerial-gateway/
The EUROCONTROL Public Airport Corner also provides information for Tallinn Airport: https://ext.eurocontrol.int/airport_corner_public/
The organisation chart is available in Annex D.
1 Technology alliance is an alliance with another service provider for joint procurement of technology from a particular supplier (e.g., COOPANS alliance) 2 Upgrade is defined as any modification that changes the operational characteristics of the system (SES Framework Regulation 549/2004, Article 2 (40))
LSSIP Year 2023 Estonia 34 Working Level Agreed
Meteorological Service Providers
Estonian Environment Agency Estonian Environment Agency, which is responsible for all activities carried out by national civil meteorological and hydrological service. The Estonian Environment Agency is responsible for provision of meteorological service (forecasting and weather warning services) for international and domestic aviation within Tallinn Flight Information Region (FIR), except EEEI AD CTR (MIL). The Weather Forecasting Department is a part of the Estonian Environment Agency (ESTEA).
Estonian Environment Agency`s objective is contribution towards the safety, regularity and efficiency of international air navigation by supplying the operators, flight crew members, air traffic service units, search and rescue services units, airport managements and other customers concerned with the conduct or development of international air navigation with the meteorological information.
The contacts of the Estonian Environment Agency and the Weather Forecasting Department can be found at https://keskkonnaagentuur.ee/en.
Service provided
Estonian Environment Agency provides 24/7 forecasting and weather warning service to Kuressaare, Kärdla, Pärnu, Tallinn, Tartu aerodromes and within Tallinn FIR. Additionally, they provide weather observation service for Estonian Civil Airports.
The organisa�on chart is available in Annex D.
Military Authorities
The Military Authorities in Estonia concerned with ATM are:
- Ministry of Defence;
- Estonian Military Aviation Authority;
- Defence Forces Air Force Staff;
- Ämari Airbase.
They report to the Ministry of Defence.
Their regulatory, service provision and user role in ATM are detailed below.
Estonian Military Aviation Authority is responsible for setting, monitoring and enforcing safety standards through military aviation regulations.
Estonian Defence Forces Air Force Staff is responsible for the safety, monitoring of military aviation tasks and participation in decision making progress concerning airspace management.
Ämari Airbase is responsible for air navigation service at Ämari military airfield and within Ämari control zone.
Co-ordination between civil air navigation service providers and the military authorities is ensured through Letters of Agreements (LoAs).
Further information is available on the Estonian Defence Forces website: https://mil.ee/en.
The organisation chart is available in Annex D.
LSSIP Year 2023 Estonia 35 Working Level Agreed
Regulatory role
Regulatory framework and rulemaking
Oversight
OAT GAT
OAT and provision of service for OAT governed by national legal provisions?
Y Provision of service for GAT by the Military governed by national legal provisions?
Y
Level of such legal provision: Ministry of Defence Level of such legal provision: Ministry of Defence, Estonian NSA
Authority signing such legal provision: Minister of Defence Authority signing such legal provision: Ministry of Defence
These provisions cover: These provisions cover:
Rules of the Air for OAT Y
Organisation of military ATS for OAT Y Organisation of military ATS for GAT Y
OAT/GAT Co-ordination Y OAT/GAT Co-ordination Y
ATCO Training Y ATCO Training Y
ATCO Licensing Y ATCO Licensing Y
ANSP Certification NA ANSP Certification Y
ANSP Supervision NA ANSP Supervision Y
Aircrew Training Y ESARR applicability NA
Aircrew Licensing Y
Additional Information: - Additional Information: -
Means used to inform airspace users (other than military) about these provisions:
Means used to inform airspace users (other than military) about these provisions:
National AIP NA National AIP Y
National Military AIP NA National Military AIP NA
EUROCONTROL eAIP NA EUROCONTROL eAIP NA
Other: Y Other: -
OAT GAT
NSA (as per SES reg. 550/2004) for GAT services provided by the military is CAA.
NSA for OAT is MoD
NSA (as per SES reg. 550/2004) for GAT services provided by the military is Estonian Transport Administration.
Additional information: - Estonian Transport Administration is responsible for the certification for GAT.
LSSIP Year 2023 Estonia 36 Working Level Agreed
Service Provision role
Military ANSP providing GAT services SES certified?
Y If YES, since: 01.05.2017 Duration of the Certificate:
NIL
Certificate issued by: Estonian Transport Administration
If NO, is this fact reported to the EC in accordance with SES regulations?
NA
Additional Information: Military provides service to GAT in Ämari CTR.
User role
OAT GAT
Services Provided: Services Provided:
En-Route N En-Route Military fly GAT, the service is provided by EANS
En-Route N
Approach/TMA N EANS Approach/TMA N
Airfield/TWR/GND Y Airfield/TWR/GND Y
AIS Y AIS N
MET Y MET Y
SAR Y SAR Y
TSA/TRA monitoring Y FIS Y
Other: - Other: -
Additional Information: Additional Information:
IFR inside controlled airspace, Military aircraft can fly?
OAT only N GAT only N Both OAT and GAT Y
If Military fly OAT-IFR inside controlled airspace, specify the available options:
Free Routing Y Within specific corridors only N
Within the regular (GAT) national route network Y Under radar control Y
Within a special OAT route system N Under radar advisory service N
If Military fly GAT-IFR inside controlled airspace, specify existing special arrangements:
No special arrangements Y Exemption from Route Charges N
Exemption from flow and capacity (ATFCM) measures N Provision of ATC in UHF N
CNS exemptions: RVSM N 8.33 N Mode S N ACAS N
Others: Provision of ATC in UHF available only by Ämari TWR.
LSSIP Year 2023 Estonia 37 Working Level Agreed
Flexible Use of Airspace (FUA)
Military in Estonia applies FUA requirements as specified in the Regulation No 2150/2005: Y
FUA Level 1 implemented: Y
FUA Level 2 implemented: Y
FUA Level 3 implemented: Y
LSSIP Year 2023 Estonia 38 Working Level Agreed
3 Implementa�on Projects
The tables below present high-level information about the main projects currently ongoing in Estonia. The details of each project are available in the LSSIP DB.
3.1 Na�onal projects
Name of project: Organisation(s): Schedule: Progress Description: Links: Implementation of UTM software
EANS (EE), Estonian Transport Administration (EE), Frequentis AG
Coordination of unmanned flights in Tallinn CTR started in 2023, services at Tartu and other regional airports will be added in the following years. UTM services for authority users (emergency services, police etc) are planned for 2024-2025. Interfacing with national drone registry is planned for early 2025. Provision of CIS services is planned in the coming years, with the implementation of U-space.
Additional services are added to the UTM system in 2024 March, together with mobile applications for pilots. Project to provide UTM services in Tartu airport begins in II quarter of 2024 with implementation planned for late 2024. Preparations for getting data from national drone registry started in 2023 and will continue throughout 2024. Discussions and workshops to design UTM services for authority users started in early 2024.
-
Navigation Infrastructure Rationalisation
EANS (EE), Estonian Transport Administration (EE)
2024 IQ Implementation and activities are ongoing, project is planned to be implemented by the first quarter of 2024.
L3: NAV03.1
Tallinn Airport A-CDM implementation project
EANS (EE), TALLINN AIRPORT Ltd. (EE)
- Delayed. Due to Covid-19 economic crisis, resources are minimized.
L3: AOP05
LSSIP Year 2023 Estonia 39 Working Level Agreed
Name of project: Organisation(s): Schedule: Progress Description: Links: rTWR Implementation EANS (EE), Estonian
Transport Administration (EE), TALLINN AIRPORT Ltd. (EE)
Tartu is operational since April 2023 and Kuressaare aerodrome should be operational in IIQ 2024.
Two airports' (Kuressaare and Tartu) remote tower installations are ready, governing body Estonian Transportation Administration has issued aeronautical equipment certificate separately for both installations. Service validation activities for Kuressaare aerodrome's remote tower are starting in November 2023. Kuressaare remote tower is expected to be operational in IIQ 2024.
-
3.2 FAB projects
NIL
3.3 Mul�na�onal projects
Name of project: Organisation(s): Schedule: Progress Description: Links: Borealis FRA Implementation (Part 2) (2015_227_AF3_A; 2015_227_AF3_B)
AVINOR AS (NO), AirNav Ireland-ATS Provider (IE), EANS (EE), Fintraffic ANS (FI), LFV (SE), LGS (LV), NATS (UK), Naviair (DK)
2015 - 2024 Work in progress L3: AOM21.2
CONCERTO Solution 2 Borealis Alliance, DLR, EANS (EE), EUROCONTROL, IcelandAir, Thales
Planning in progress Project started 2023.
Implementation planned 2023-2026
-
EANS Support to ACADIA (2022_014_AF5)
EANS (EE), EUROCONTROL Project ongoing Implementation plan established and subtask 2 achieved.
L3: INF10.7, INF10.6, INF10.8
LSSIP Year 2023 Estonia 40 Working Level Agreed
4 Coopera�on Ac�vi�es
4.1 FAB Coordina�on
NEFAB
The main objectives of ANSPs cooperation in the framework of NEFAB are coordination of efforts, sharing of resources
and synergy.
This cooperation includes:
- Coordinated cooperation with States to support NEFAB Committees and Council;
- Analysis and monitoring of SES requirements, coordinating with EU initiatives;
- Common representation of the NEFAB ANSPs at the NMB;
- Cooperation and information sharing between NEFAB ANSPs on CANSO and NM working groups activities;
- Coordinated contribution to NDOP, NDTECH and development of network services.
4.2 Mul�na�onal Coopera�on Ini�a�ves
Borealis FRA
The Borealis Alliance is the industrial partnership between 9 European ANSPs - LFV (Sweden), ANS Finland (Finland), Avinor (Norway), Isavia ANS (Iceland), Naviair (Denmark), EANS (Estonia), IAA (Ireland), LGS (Latvia) and NATS (UK). The objective of the Alliance is to enable joint initiatives to improve flight efficiency and reduce environmental impact, delivered across the whole area in a move which will also streamline cost of services and operational/technical infrastructure.
Alliance continues to work on Free Route Airspace (FRA) Programme execution to create a multi-FAB FRA by establishing interfaces between FRA areas in 3 FABs and Iceland. FRA implementation is still on-going in UK and is expected to complete in 2028.
Meanwhile, the IAA expanded Free Route Airspace (FRA) in 2017 to include Low Level airspace from FL075. In 2019 the Borealis Alliance commenced cross-border FRA between the Maastricht UAC area of responsibility, the DK/SE FAB and the northern part of Germany; and remains open to considering other cross-border proposals should they arise.
Successful FRA implementation in NEFRA airspace enabled the removal of ATS routes in Estonia and Finland. Some other States also consider removal of ATS routes.
FINEST
FINEST is a bilateral coopera�on programme between Estonia EANS and Fintraffic ANS intended to respond to the demands of increased air traffic and Single European Sky requirements.
The objec�ve of FINEST is to achieve op�mal performance in the areas of service provision, cost-efficiency, capacity, flight efficiency, con�nuity and safety. This has been expected to be achieved by providing dynamic cross-border service with common technical system infrastructure from two loca�ons.
LSSIP Year 2023 Estonia 41 Working Level Agreed
The project was kicked off in 2018 and since then, both EANS and Fintraffic ANS have been working together, involving also other par�es in both countries, to both legally and technically make the service provision in the shared airspace happen. FINEST is planned to be launched in phases. ANSP-s have harmonized the ATM System parameters in 2020, have installed the upgraded version of ATM System TopSky on both sides in spring 2021. At the beginning of 2022 EANS finalized airspace changes which is the enabler for the cross border FINEST project and harmonized opera�onal procedures. Due to geopoli�cal situa�on the approval for the project from MoDs have been delayed as addi�onal concerns were raised. Throughout the year 2023 the dialogue with owners and MoDs were kept open to define the way for approval in the changed geopoli�cal situa�on. The cross-border service provision shall be ini�ated a�er the final approval from both Sates.
LSSIP Year 2023 Estonia 42 Working Level Agreed
5 Detailed Objec�ves Implementa�on progress
Objective/Stakeholder Progress Code:
Completed Not yet planned
Ongoing Not Applicable
Planned Missing Data
In 2023, there was a greater focus on mee�ng the requirements of CP1, and several ac�vi�es were completed. Yet some projects have got a delay, and some have been postponed (Due to luck of human resource and budget-related issues).
Main Objectives
AOM13.1
Harmonise Opera�onal Air Traffic (OAT) and General Air Traffic (GAT) Handling Timescales: Ini�al opera�onal capability: 01/01/2012 Full opera�onal capability: 31/12/2018
56 Ongoing
- Ac�vity should be completed by the end 2024. 31/12/2024
REG (By:12/2018) Estonian Air Force (MIL) 40% Ongoing Estonian na�onal military avia�on regula�ons are in force. Review of IFR OAT harmonisa�on procedures is postponed to 2024. - 31/12/2024
Estonian Transport Administra�on 40% Ongoing Objec�ve is in late status. The ac�vity was not completed in 2023 due to ongoing lack of HUM resources. - 31/12/2024
ASP (By:12/2018) EANS 100% Completed Objec�ve ac�vi�es completed by EANS. - 28/02/2022 Estonian Air Force (MIL) 100% Completed Estonian na�onal military avia�on regula�ons are in force. TRG is done. - 31/12/2021
MIL (By:12/2018) Estonian Air Force (MIL) 20% Ongoing Estonian AF will connect na�onal route structures and arrangements to form a flexible system facilita�ng OAT-IFR cross-border flights across Europe and implement harmonized military flight planning for OAT cross-border opera�ons.
- 31/12/2024
SDP 3.1.2 AOM19.4
Management of Predefined Airspace Configura�ons Timescales: Ini�al opera�onal capability: 01/01/2018 Full Opera�onal Capability / Target Date: 31/12/2022
100 Completed
- Objec�ve completed. 27/01/2022
ASP (By:12/2022) EANS 100% Completed
LSSIP Year 2023 Estonia 43 Working Level Agreed
SDP 3.1.2 AOM19.4
Management of Predefined Airspace Configura�ons Timescales: Ini�al opera�onal capability: 01/01/2018 Full Opera�onal Capability / Target Date: 31/12/2022
100 Completed
Objec�ve completed. - 27/01/2022
SDP 3.1.1 AOM19.5
ASM and A-FUA Timescales: Ini�al Opera�onal Capability: 01/01/2014 Full Opera�onal Capability / Target Date: 31/12/2022
100 Completed
- The status of the objec�ve is "late", since project relates to the FINEST project. FINEST was postponed from the co-opera�onal State side. Nonetheless, according to the last feedback received from SDM AF3 Experts (27 Feb 2023): EANS is already compliant even if using a local ASM and not having any automated connec�on with ATC system at the moment, but manually triggering reserved areas on ATCOs CWPs. This automated exchange shall be there for AF5 target date (31.12.2025).
31/12/2021
ASP (By:12/2022) EANS 100% Completed 2022 was planned common ASM system with FINEST CROSS BDRY service, but project postponed. Fully completed when LARA-Topsky interface is implemented. Nonetheless, according to the last feedback received from SDM AF3 Experts (27 Feb 2023): EANS is already compliant even if using a local ASM and not having any automated connec�on with ATC system at the moment, but manually triggering reserved areas on ATCOs CWPs. This automated exchange shall be there for AF5 target date (31.12.2025).
- 31/12/2021
SDP 3.2.1 AOM21.2
Ini�al Free Route Airspace Timescales: Ini�al opera�onal capability: 01/01/2015 Full Opera�onal Capability / Target Date: 31/12/2022
100 Completed
- Free Route Airspace was implemented within NEFAB area on 12 November 2015. 12/11/2015
ASP (By:12/2022) EANS 100% Completed
NEFAB Free Route Airspace was implemented on 12 November 2015. Borealis FRA
Implementa�on (Part 2)
12/11/2015
SDP 3.2.2 AOM21.3
Enhanced Free Route Airspace Opera�ons Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
100 Completed
- Completed. 23/04/2020
ASP (By:12/2025) EANS 100% Completed
LSSIP Year 2023 Estonia 44 Working Level Agreed
SDP 3.2.2 AOM21.3
Enhanced Free Route Airspace Opera�ons Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
100 Completed
- The neighbouring countries with which they have cross-border FRA opera�ons (being) implemented: Latvia, Finland, Sweden. - The TMAs with which FRA connec�vity to TMAs (being) implemented: Helsinki TMA ja Tallinn TMA. - Time limita�ons: NIL - Flight Level: FL095+ excl Tallinn TMA ja Helsinki TMA - Published Constraints: restric�ons Estonian AIP ENR3.3, ENR1 FRA General procedures, ENR 3.5, ENR4.4 (FRA relevance). - Area of Responsibility: Tallinn FIR, NEFRA
- 23/04/2020
AOP04.1
Advanced Surface Movement Guidance and Control System A-SMGCS Surveillance Service (former ICAO Level 1) Timescales: Ini�al opera�onal capability: 01/01/2007 Full opera�onal capability: 31/12/2020
100 Completed
EETN - Tallinn Airport A-SMGCS Level 1 system is implemented on 10 February 2011. 31/12/2013
REG (By:12/2010) Estonian Transport Administra�on 100% Completed Transponder opera�ng procedures are published in the AIP. - 31/12/2013
ASP (By:01/2021) EANS 100% Completed A-SMGCS system on the Tallinn airport is implemented on February, 10 2011. - 28/02/2011
APO (By:01/2021) TALLINN AIRPORT Ltd. 100% Completed A-SMGCS system on the Tallinn airport is implemented on February 10 2011. - 28/02/2011
AOP04.2
Advanced Surface Movement Guidance and Control System (A-SMGCS) Runway Monitoring and Conflict Aler�ng (RMCA) (Airport Safety Support Service = former ICAO Level 2) Timescales: Ini�al opera�onal capability: 01/01/2021 Full opera�onal capability: 31/12/2025
100 Completed
EETN - Tallinn Airport A-SMGCS Level II system at Tallinn Airport is implemented on 10 February 2011. 28/02/2011
ASP (By:12/2025) EANS 100% Completed A-SMGCS Level II system at the Tallinn airport is implemented on 10 February 2011. - 28/02/2011
APO (By:12/2025) TALLINN AIRPORT Ltd. 100% Completed A-SMGCS Level II system at Tallinn Airport is implemented on 10 February 2011. - 28/02/2011
AOP05
Airport Collabora�ve Decision Making (A-CDM) Timescales: Ini�al opera�onal capability: 01/01/2004 Full opera�onal capability: 31/12/2020
1 Ongoing
EETN - Tallinn Airport
LSSIP Year 2023 Estonia 45 Working Level Agreed
AOP05
Airport Collabora�ve Decision Making (A-CDM) Timescales: Ini�al opera�onal capability: 01/01/2004 Full opera�onal capability: 31/12/2020
1 Ongoing
EANS and Tallinn airport postponed the implementa�on of A-CDM at Tallinn aerodrome. A-CDM should be implemented in the frame of project Airport 4.0. 31/12/2030
ASP (By:01/2021)
EANS 0% Not yet planned
The full implementa�on of A-CDM is currently not planned, and a more detailed analysis is planned in 2025.
Tallinn Airport A- CDM
implementa�on project
-
APO (By:01/2021) TALLINN AIRPORT Ltd. 2% Ongoing
The full implementa�on of A-CDM is currently not planned. More detailed analysis is planned in 2025.
Tallinn Airport A- CDM
implementa�on project
31/12/2030
AOP10 Time-Based Separa�on Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport No opera�onal need to implement TBS in EETN -
REG (By:01/2024)
Estonian Transport Administra�on 0% Not Applicable
No opera�onal need to implement TBS in EETN - - ASP (By:12/2024)
EANS 0% Not Applicable
No opera�onal need to implement TBS in EETN - -
SDP 2.2.1 AOP11.1
Ini�al Airport Opera�ons Plan Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport N/A for EETN AD, according to bilateral mee�ng Bilateral mee�ng NEFAB. -
ASP (By:12/2023)
EANS 0% Not Applicable
N/A. - - APO (By:12/2023)
SDP 2.2.2 AOP11.2
Extended Airport Opera�ons Plan Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport Outside of applicability area, EETN is non-CP1 Airport. -
ASP (By:12/2027)
EANS 0% Not Applicable
Outside of applicability area. - - APO (By:12/2027)
LSSIP Year 2023 Estonia 46 Working Level Agreed
SDP 2.2.2 AOP11.2
Extended Airport Opera�ons Plan Timescales: - not applicable -
0 Not Applicable
TALLINN AIRPORT Ltd. 0% Not Applicable
EETN is non-CP1 Airport. - -
SDP 2.3.1 AOP12.1
Airport Safety Nets Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport N/A for EETN AD, according to bilateral mee�ng and MPL3 Plan 2022_Technical Annex_v1.1_ANNEX 3 – APPLICABILITY TO AIRPORTS -
ASP (By:12/2025)
EANS 0% Not Applicable
N/A. - - APO (By:12/2025)
AOP13
Automated Assistance to Controller for Surface Movement Planning and Rou�ng Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport No opera�onal need in EETN -
REG (By:12/2025)
Estonian Transport Administra�on 0% Not Applicable
No opera�onal need in EETN - - ASP (By:12/2025)
EANS 0% Not Applicable
No opera�onal need in EETN - -
SDP 2.1.1 AOP19
Departure Management Synchronised with Pre-departure sequencing Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport EETN is non-CP1 Airport -
ASP (By:12/2022)
EANS 0% Not Applicable
Outside of applicability area. - - APO (By:12/2022)
ATC02.8
Ground-Based Safety Nets Timescales: Ini�al opera�onal capability: 01/01/2009 Full opera�onal capability: 31/12/2021
100 Completed
- System is ready for use, but no demand, thereof ATC TRG NA also. Planned ac�va�on date is unknown. 31/12/2022
ASP (By:12/2021) EANS 100% Completed
LSSIP Year 2023 Estonia 47 Working Level Agreed
ATC02.8
Ground-Based Safety Nets Timescales: Ini�al opera�onal capability: 01/01/2009 Full opera�onal capability: 31/12/2021
100 Completed
MSAW and APM func�ons are technically available in ATM system, however, due to no opera�onal demand and low ground structure, there is no need to ac�vate MSAW and APM func�ons. APW func�on is implemented.
- 31/12/2022
ATC07.1 AMAN Tools and Procedures Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport There is no opera�onal need for basic AMAN. No forecast indica�ng the need. However, EANS is using AMAN for Helsinki inbound traffic and affected by ESSA extended AMAN plans.
-
ASP (By:01/2020)
EANS 0% Not Applicable
There is no opera�onal need for basic AMAN. No forecast indica�ng the need. However, we are using AMAN for Helsinki inbound traffic and affected by ESSA extended AMAN plans.
- -
ATC12.1
Automated Support for Conflict Detec�on, Resolu�on Support Informa�on and Conformance Monitoring Timescales: Ini�al opera�onal capability: 01/01/2015 Full opera�onal capability: 31/12/2021
100 Completed
- MTCD, resolu�on support func�on and MONA are available since 2012. No definite plans to implement TCT. 31/05/2012
ASP (By:12/2021) EANS 100% Completed MTCD, resolu�on support func�on and MONA are available since 2012. No definite plans to implement TCT. - 31/05/2012
ATC15.1
Informa�on Exchange with En-route in Support of AMAN Timescales: Ini�al opera�onal capability: 01/01/2012 Full opera�onal capability: 31/12/2019
100 Completed
- In En-Route opera�ons, informa�on exchange mechanisms, tools and procedures are implemented. 31/01/2017
ASP (By:12/2019) EANS 100% Completed In En-Route opera�ons, informa�on exchange mechanisms, tools and procedures are implemented. - 31/01/2017
SDP 1.1.1 ATC15.2
Arrival Management Extended to En-route Airspace Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport N/A for EETN AD, EETN AD is non-CP1. -
ASP (By:12/2024)
EANS 0% Not Applicable
Tallinn Airport is not listed in CP1 Geographical Scope. - -
LSSIP Year 2023 Estonia 48 Working Level Agreed
SDP 1.2.1 ATC19
AMAN/DMAN Integra�on Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport N/A for EETN AD, Tallinn Airport is not listed in CP1 Geographical Scope. -
ASP (By:12/2027)
EANS 0% Not Applicable
No planned ac�vi�es. Tallinn Airport is not listed in CP1 Geographical Scope. - - APO (By:12/2027)
TALLINN AIRPORT Ltd. 0% Not Applicable
Not planned, Tallinn Airport is not listed in CP1 Geographical Scope. - -
SDP 6.1.2 ATC23
Ini�al Air-Ground Trajectory Informa�on Sharing (Ground Domain) Timescales: Ini�al Opera�onal Capability: 01/01/2024 Full Opera�onal Capability / Target Date: 31/12/2027
0 Not yet planned
- The objec�ve is not planned yet. -
ASP (By:12/2027)
EANS 0% Not yet planned
The objec�ve is not planned yet. - -
SDP 6.3.1 ATC25
Ini�al Trajectory Informa�on Sharing ground distribu�on Timescales: Ini�al Opera�onal Capability: 01/01/2024 Full Opera�onal Capability / Target Date: 31/12/2027
0 Not yet planned
- Not yet planned. -
ASP (By:12/2027)
EANS 0% Not yet planned
Not yet planned. Currently we are looking into the possibility to join the ACDLS. - -
COM10.2
Extended AMHS Timescales: Ini�al Opera�onal Capability: 01/12/2011 Full Opera�onal Capability: 31/12/2024
100 Completed
- AMHS capability is available, tested, validated, but not in use yet. 12/10/2021
ASP (By:12/2024) EANS 100% Completed Capability is available, tested, validated, but not in use. There is no need for enhanced capability. - 12/10/2021
COM11.1
Voice over Internet Protocol (VoIP) in En-Route Timescales: Ini�al opera�onal capability: 01/01/2013 Full opera�onal capability: 31/12/2021
100 Completed
- The VCS project was completed by 23. March 2023. 23/03/2023
ASP (By:12/2021)
LSSIP Year 2023 Estonia 49 Working Level Agreed
EANS 100% Completed The VCS project completed. The new MAIN VoIP VCS and B-up VCS are opera�onal. - 23/03/2023
COM11.2
Voice over Internet Protocol (VoIP) in Airport/Terminal Timescales: Ini�al opera�onal capability: 01/01/2013 Full opera�onal capability: 31/12/2023
100 Completed
- Ac�vi�es are completed, related to the development of remote tower. EETU AD remote Aerodrome Flight Informa�on Service is cer�fied on 20.04.2023. 20/04/2023
ASP (By:12/2023) EANS 100% Completed Ac�vi�es are completed, related to the development of remote tower. - 20/04/2023
COM12
New Pan-European Network Service (NewPENS) Timescales: Ini�al opera�onal capability: 01/01/2018 Full opera�onal capability: 31/12/2024
100 Completed
- CPA has been signed. EANS migrated to NewPENS in July 2019. AD has announced on JAN 2021, that they have no plans to migrate into the NewPENS. 31/07/2019
ASP (By:12/2024) EANS 100% Completed EANS migrated to NewPENS in July 2019. - 31/07/2019
APO (By:12/2024)
TALLINN AIRPORT Ltd. 0% Not Applicable
AD has no plans to migrate into the NewPENS. - -
ENV01
Con�nuous Descent Opera�ons (CDO) Timescales: Ini�al opera�onal capability: 01/07/2007 Full opera�onal capability: 31/12/2023
100 Completed
EETN - Tallinn Airport CDO and P-RNAV procedures were implemented in Tallinn TMA 30 May 2013. Performance monitoring is done. 31/12/2023
ASP (By:12/2023) EANS 100% Completed EANS implemented P-RNAV and CDO techniques in May 2013. Performance monitoring by ANSP side is done via Eurocontrol site htps://ansperformance.eu/ and also in coopera�on with Tallinn Airport.
- 31/12/2023
APO (By:12/2023) TALLINN AIRPORT Ltd. 100% Completed Monitoring of performance is established, data received from EANS. - 31/12/2017
FCM03
Collabora�ve Flight Planning Timescales: Ini�al opera�onal capability: 01/01/2000 Full opera�onal capability: 31/12/2022
100 Completed
-
LSSIP Year 2023 Estonia 50 Working Level Agreed
Func�onality installed and available but problems so far at NM within automa�cally processing and firmly specifying the use of AFP-messages in the Free Route Airspace environment causes that full FoC implementa�on of collabora�ve flight planning. Though all func�onality has been installed according to spec, the interoperability between Thales TopSky and NM system has not been achieved due to complicated FRA opera�ons environment, not fully covered at NM.
01/01/2023
ASP (By:12/2022) EANS 100% Completed Func�onality installed and available but problems so far at NM within automa�cally processing and firmly specifying the use of AFP-messages in the Free Route Airspace environment causes that full FoC implementa�on of collabora�ve flight planning. Though all func�onality has been installed according to spec, the interoperability between Thales TopSky and NM system has not been achieved due to complicated FRA opera�ons environment, not fully covered at NM.
- 01/01/2023
SDP 4.1.1 FCM04.2
Enhanced Short Term ATFCM Measures Timescales: Ini�al opera�onal capability: 01/11/2017 Full Opera�onal Capability / Target Date: 31/12/2022
100 Completed
- STAM is in opera�onal use in accordance to NM CHMI and related training package. 30/06/2023
ASP (By:12/2022) EANS 100% Completed EANS is using NM STAM so�ware tool, and all the needed trainings are completed. - 30/06/2023
SDP 4.3.1 FCM06.1
Automated Support for Traffic Complexity Assessment and Flight Planning interfaces Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target date: 31/12/2022
100 Completed
- ANSP EANS relies to NM system support & development and is using CHMI and NMP Flow applica�on. Processing of APL and ACL messages is completed.
31/12/2023
ASP (By:12/2022) EANS 100% Completed EANS relies to NM system support & development and is using CHMI and NMP Flow applica�on. Processing of APL and ACL messages is completed.
- 31/12/2023
SDP 4.2.1 FCM10
Interac�ve Rolling NOP Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2023
100 Completed
- Objec�ve FCM10 does not apply to Tallinn Airport, therefore SLoA FCM10-APO01 is marked N/A. Which brings FCM10 to ‘Completed’. 30/06/2023
ASP (By:12/2023) EANS 100% Completed CHMI updates and related trainings done. - 30/06/2023
APO (By:12/2023)
LSSIP Year 2023 Estonia 51 Working Level Agreed
SDP 4.2.1 FCM10
Interac�ve Rolling NOP Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2023
100 Completed
TALLINN AIRPORT Ltd. 0% Not Applicable
According to NEFAB Bilateral mee�ng informa�on, objec�ve FCM10 does not apply to Tallinn Airport. - -
SDP 4.2.2 FCM11.1
Ini�al AOP/NOP Informa�on Sharing Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport EETN AD is non-CP1, N/A according to MPL3 Plan 2023 Technical Annex, Annex 3. Nevertheless A-CDM for EETN AD is s�ll in plans, more detailed informa�on is expected to come on 2025.
-
ASP (By:12/2023)
EANS 0% Not Applicable
Outside applicability area. - - APO (By:12/2023)
SDP 4.4.1 FCM11.2
AOP/NOP integra�on Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport EETN AD is non-CP1 Airport, N/A according to MPL3 Plan 2023 Technical Annex 3. -
ASP (By:12/2027)
EANS 0% Not Applicable
Outside applicability area. - - APO (By:12/2027)
INF07
Electronic Terrain and Obstacle Data (eTOD) Timescales: Ini�al opera�onal capability: 01/11/2014 Full opera�onal capability: 31/12/2018
6 Ongoing
- Process is in late status due to constant lack of human resources in NSA. Electronic TOD should be established by 31 December 2024. 31/12/2025
REG (By:01/2019) Estonian Transport Administra�on 8% Ongoing Process is in late status due to constant lack of human resources in NSA. Electronic TOD should be established by 31 December 2024. - 31/12/2024
ASP (By:01/2019) EANS 5% Ongoing No progress compared to last year, EANS cannot con�nue any ac�vity before Na�onal TOD Policy is available. - 31/12/2025
APO (By:01/2019) TALLINN AIRPORT Ltd. 5% Ongoing All AO related ac�vi�es will be performed a�er Na�onal TOD Policy is available. - 31/12/2025
LSSIP Year 2023 Estonia 52 Working Level Agreed
SDP 5.2.1 INF10.2
Stakeholders’ SWIM PKI and cyber security Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
13 Ongoing
- Process is slowly ongoing. 31/12/2025
ASP (By:12/2025) EANS 8% Ongoing EANS will be using the EACP solu�on. - 31/12/2024
APO (By:12/2025)
TALLINN AIRPORT Ltd. 0% Not yet planned
AD has not yet decided, with what to go further and how. Discussions with other local Stakeholders are ongoing. - -
MET (By:12/2025) Estonian Environment Agency 18% Ongoing NIL - 31/12/2025
SDP 5.3.1 INF10.3
Aeronau�cal Informa�on Exchange - Airspace structure service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
100 Completed
- LARA adapted/in use. 10/06/2020
ASP (By:12/2025) EANS 100% Completed LARA is used according to their installa�on. - 10/06/2020
SDP 5.3.1 INF10.4
Aeronau�cal Informa�on Exchange - Airspace Availability Service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
100 Completed
- ANSP has ASM system LARA which provides the AUP/UUP to NM. 31/12/2022
ASP (By:12/2025) EANS 100% Completed EANS has ASM system LARA which provides the AUP/UUP to NM. EANS is par�cipa�ng in LARA user group and also following the ac�vi�es of "ASM SWIM" project ac�vi�es to ensure the compliance of LARA tool.
- 31/12/2022
SDP 5.3.1 INF10.5
Aeronau�cal Informa�on Exchange - Airspace Reserva�on (ARES) Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
3 Ongoing
- LARA is in use. ARES info is visible to all LARA customers who have access to LARA. ANSP is wai�ng for release v5, when LARA will enable to implement the full scope of ARES exchanges via SWIM.
31/12/2024
ASP (By:12/2025) EANS 3% Ongoing
LSSIP Year 2023 Estonia 53 Working Level Agreed
LARA is used. ARES info is visible to all LARA customers who have access to LARA. Systems are used according to their installa�on. Wai�ng for release v5, when LARA will enable to implement the full scope of ARES exchanges via SWIM.
- 31/12/2024
SDP 5.3.1 INF10.6
Aeronau�cal Informa�on Exchange – Digital NOTAM service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
64 Ongoing
- Will be implemented with SWIM and informa�on exchange system developments, systems planned to be ready 2025. 31/12/2025
ASP (By:12/2025) EANS 0% Planned EANS is par�cipa�ng in project ACADIA to ensure accordance. Ac�vi�es started in 2023 and objec�ve is planned to be in opera�onal use by 2025.
EANS Support to ACADIA 31/12/2025
AIS (By:12/2025) EANS 80% Ongoing EANS is par�cipa�ng in project ACADIA to ensure accordance. Ac�vi�es are ongoing in the project plan.
EANS Support to ACADIA 31/12/2025
SDP 5.3.1 INF10.7
Aeronau�cal Informa�on Exchange - Aerodrome mapping service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Ongoing
- Outside of the area of applicability. Nevertheless ANSP is par�cipa�ng in the ACADIA project and aerodrome mapping service is also in the scope.
31/12/2025
AIS (By:12/2025) EANS 10% Ongoing EANS is par�cipa�ng in the ACADIA project and aerodrome mapping service is also in the scope.
EANS Support to ACADIA 31/12/2025
SDP 5.3.1 INF10.8
Aeronau�cal Informa�on Exchange - Aeronau�cal Informa�on Features service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
8 Ongoing
- Ac�vi�es are part of ACADIA project. 31/12/2025
ASP (By:12/2025) EANS 0% Planned
Ac�vi�es part of ACADIA project. EANS Support to ACADIA 31/12/2025
AIS (By:12/2025) EANS 10% Ongoing
Ongoing, ac�vi�es part of ACADIA project. EANS Support to ACADIA 31/12/2025
LSSIP Year 2023 Estonia 54 Working Level Agreed
SDP 5.4.1 INF10.9
Meteorological Informa�on Exchange - Volcanic Ash Mass Concentra�on informa�on service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
3 Ongoing
- Implementa�on should be via ANSP co-opera�on ready for 31.12.2025. 31/12/2025
ASP (By:12/2025) EANS 0% Planned We are planning system upgrades to consume SWIM MET services, depends on MET service provider. - 31/12/2025
MET (By:12/2025) Estonian Environment Agency 3% Ongoing We are planning system upgrades to provide SWIM MET services, poten�al coopera�on with NamCon countries to be clarified during 2024. For the Volcanic Ash Mass Concentra�on Informa�on Service, it is clarified that this informa�on will be provided in SWIM format by the VAACs. The VAACs expects to be fully opera�onal by 2024; ESTEA as MET Provider will contact the UK MET Office and Meteo France in order to discuss the service defini�on in view of the future consump�on of the informa�on.
- 31/12/2025
SDP 5.4.1 INF10.10
Meteorological Informa�on Exchange - Aerodrome Meteorological informa�on Service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
47 Ongoing
- SWIM implementa�on should be ready on 2025. MET ANSP is serving AD and its users as demanded by IR (EU) 2017/373 using TAC/IWXXM. 31/12/2025
ASP (By:12/2025) EANS 0% Planned Depends on MET service provider. - 31/12/2025
APO (By:12/2025) TALLINN AIRPORT Ltd. 0% Planned AS Tallinna Lennujaam (Tallinn Airport Ltd.) is not MET service provider, the service is provided by Environmental Agency (Keskkonnaagentuur) from August 2020.
- 31/12/2024
MET (By:12/2025) Estonian Environment Agency 53% Ongoing MET ANSP is serving AD and its users as demanded by IR (EU) 2017/373 using TAC/IWXXM. - 31/12/2025
SDP 5.4.1 INF10.11
Meteorological Informa�on Exchange - En-Route and Approach Meteorological informa�on service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
5 Ongoing
- SWIM implementa�on should be ready in 2025. 31/12/2025
ASP (By:12/2025) EANS 0% Planned We are planning system upgrades to consume SWIM MET services. - 31/12/2025
MET (By:12/2025) Estonian Environment Agency 7% Ongoing We are planning to provide services accordingly SWIM MET services, poten�al coopera�on within NamCon countries for development. - 31/12/2025
LSSIP Year 2023 Estonia 55 Working Level Agreed
SDP 5.4.1 INF10.12
Meteorological Informa�on Exchange - Network Meteorological Informa�on Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Planned
- SWIM PKI etc. implementa�on should be ready in 2025. ATS ANSP is planning to consume SWIM MET services. 31/12/2025
ASP (By:12/2025) EANS 0% Planned We are planning system upgrades to consume SWIM MET services. - 31/12/2025
MET (By:12/2025)
Estonian Environment Agency 0% Not Applicable
ESTEA do not contribute in EUMETNET CBCF, so we are not mandated to provide the service. - -
SDP 5.5.1 INF10.13
Coopera�ve Network Informa�on Exchange - ATFCM Tac�cal Updates Service (Airport Capacity and Enroute) Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Not Applicable
- Not applicable. -
ASP (By:12/2025)
EANS 0% Not Applicable
Applies only if local complexity tool is used. N/A for this monitoring cycle. - -
SDP 5.5.1 INF10.14
Coopera�ve Network Informa�on Exchange – Flight Management Service (Slots and NOP/AOP integra�on) Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Not Applicable
- As per SDM instruc�ons, Estonia is not mandated to implement iAOP/eAOP (Tallinn Airport is exempted from the implementa�on of (i)AOP). Thereof this objec�ve is reported as Not Applicable,
-
ASP (By:12/2025)
EANS 0% Not Applicable
As per SDM instruc�ons as Estonia is not mandated to implement iAOP/eAOP, this Objec�ve can be reported as Not Applicable. - -
APO (By:12/2025)
TALLINN AIRPORT Ltd. 0% Not Applicable
Not planned either. - -
SDP 5.5.1 INF10.15
Coopera�ve Network Informa�on Exchange – Measures Service (Traffic Regula�on) Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Not Applicable
- Not applicable. -
ASP (By:12/2025)
LSSIP Year 2023 Estonia 56 Working Level Agreed
EANS 0% Not Applicable
Applies only if local complexity tool is used. N/A for this monitoring cycle. - -
SDP 5.5.1 INF10.16
Coopera�ve Network Informa�on Exchange - Short Term ATFCM Measures services (MCDM, eHelpdesk, STAM measures) Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Not Applicable
- Not applicable. -
ASP (By:12/2025)
EANS 0% Not Applicable
Applies only if local complexity tool is used. N/A for this monitoring cycle. - -
SDP 5.5.1 INF10.17
Coopera�ve Network Informa�on Exchange – Counts service (ATFCM Conges�on Points) Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Not Applicable
- Not applicable. -
ASP (By:12/2025)
EANS 0% Not Applicable
Applies only if local complexity tool is used. N/A for this monitoring cycle. - -
SDP 5.6.1 INF10.19
Flight Informa�on Exchange (Yellow Profile) - Flight Data Request Service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Planned
- Planned to reach objec�ve according to SP ac�vi�es. 31/12/2030
ASP (By:12/2025) EANS 0% Planned
LSSIP Year 2023 Estonia 57 Working Level Agreed
SDP 5.6.1 INF10.19
Flight Informa�on Exchange (Yellow Profile) - Flight Data Request Service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Planned
Planned to consume NM B2B services: - ARO briefing systems by 2024 - ac�vi�es ongoing. - ATM systems: TWR systems 2028 (according to CP1 not an obliga�on) and ACC 2030 - ac�vi�es planned. ATM system provider not fully decided. - rTWR: TBD (according to CP1 not an obliga�on). ARO systems: The system will be extended to support the submission of FPL and update messages via NM B2B using their FF-ICE services. The following transforma�ons are done from current message input to service: FilingService: FPL: FiledFlightPlanRequest CHG: FlightPlanUpdateRequest DLA: FlightPlanUpdateRequest CNL: FlightPlanCancella�onRequest TrialService: FPL valida�on only: TrialRequest FlightDataRequestService: RQP: FlightDataRequest RQS: FlightDataRequest No�fica�onService: DEP: FlightDepartureRequest ARR: FlightArrivalRequest When in the Center Terminal a message with above type is sent to the IFPS, then the corresponding B2B service is used for transmi�ng the data via FFICE service instead of AFTN/AMHS message. A system parameter allows to enable/disable the submission of the data via NM B2B. When disabled the message is sent out in the tradi�onal way via AFTN/AMHS ICAO text messages.
- 31/12/2030
SDP 5.6.1 INF10.20
Flight Informa�on Exchange (Yellow Profile) - No�fica�on Service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Planned
- Planned according to SP ac�vi�es. 31/12/2030
ASP (By:12/2025) EANS 0% Planned
LSSIP Year 2023 Estonia 58 Working Level Agreed
SDP 5.6.1 INF10.20
Flight Informa�on Exchange (Yellow Profile) - No�fica�on Service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Planned
Planned to consume NM B2B services (ATM systems and ARO briefing). - ARO briefing systems by 2025 - ac�vi�es ongoing. - ATM systems: TWR systems 2028 (not CP1 obliga�on) and ACC 2030 - ac�vi�es planned (ATM system provider not fully decided). - rTWR: TBD (not CP1 obliga�on). ARO systems: The system will be extended to support the submission of FPL and update messages via NM B2B using their FF-ICE services. The following transforma�ons are done from current message input to service: FilingService: FPL: FiledFlightPlanRequest CHG: FlightPlanUpdateRequest DLA: FlightPlanUpdateRequest CNL: FlightPlanCancella�onRequest TrialService: FPL valida�on only: TrialRequest FlightDataRequestService: RQP: FlightDataRequest RQS: Flight Data Request No�fica�onService: DEP: FlightDepartureRequest ARR: FlightArrivalRequest When in the Center Terminal a message with above type is sent to the IFPS, then the corresponding B2B service is used for transmi�ng the data via FFICE service instead of AFTN/AMHS message. A system parameter allows to enable/disable the submission of the data via NM B2B. When disabled the message is sent out in the tradi�onal way via AFTN/AMHS ICAO text messages.
- 31/12/2030
SDP 5.6.1 INF10.21
Flight Informa�on Exchange (Yellow Profile) - Data Publica�on Service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Planned
- Planned according to SP ac�vi�es. 31/12/2030
ASP (By:12/2025) EANS 0% Planned
LSSIP Year 2023 Estonia 59 Working Level Agreed
SDP 5.6.1 INF10.21
Flight Informa�on Exchange (Yellow Profile) - Data Publica�on Service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Planned
Planned to consume NM B2B services (ATM systems and ARO briefing). ARO systems will be ready by 2025, ATM systems by 2030. ARO systems: The system will be extended to support the submission of FPL and update messages via NM B2B using their FF-ICE services. The following transforma�ons are done from current message input to service: FilingService: FPL: FiledFlightPlanRequest CHG: FlightPlanUpdateRequest DLA: FlightPlanUpdateRequest CNL: FlightPlanCancella�onRequest TrialService: FPL valida�on only: TrialRequest FlightDataRequestService: RQP: FlightDataRequest RQS: FlightDataRequest No�fica�onService: DEP: FlightDepartureRequest ARR: FlightArrivalRequest When in the Center Terminal a message with above type is sent to the IFPS, then the corresponding B2B service is used for transmi�ng the data via FFICE service instead of AFTN/AMHS message. A system parameter allows to enable/disable the submission of the data via NM B2B. When disabled the message is sent out in the tradi�onal way via AFTN/AMHS ICAO text messages.
- 31/12/2030
SDP 5.6.1 INF10.23
Flight Informa�on Exchange (Yellow Profile) - Extended AMAN SWIM Service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Not Applicable
- N/A as there are no domes�c airports to which this applies (EETN AD is not CP1 AD). -
ASP (By:12/2025)
EANS 0% Not Applicable
N/A as there are no domes�c airports to which this applies. - -
ITY-ACID
Aircra� Iden�fica�on Timescales: Entry into force of the Regula�on: 13/12/2011 System capability: 02/01/2020
92 Ongoing
- EANS have sent template for Mode S Declara�on to NM on 30/01/2020, confirming that Mode S is implemented in Tallinn FIR above FL95. System will be fully implemented when neighbouring ANSP-s have the capability as well.
31/12/2024
LSSIP Year 2023 Estonia 60 Working Level Agreed
ITY-ACID
Aircra� Iden�fica�on Timescales: Entry into force of the Regula�on: 13/12/2011 System capability: 02/01/2020
92 Ongoing
ASP (By:01/2020) EANS 92% Ongoing EANS have sent template for Mode S Declara�on to NM on 30/01/2020, confirming that Mode S is implemented in Tallinn FIR above FL95. According to the response from NM, the system can only be implemented when neighbouring countries are ready. Will be fully implemented when neighbouring ANSP-s have the capability.
- 31/12/2024
ITY-AGDL
Ini�al ATC Air-Ground Data Link Services Timescales: Entry into force: 06/02/2009 ATS unit opera�onal capability: 05/02/2018 Aircra� capability: 05/02/2020
100 Completed
- Estonia implemented CPDLC in Tallinn FIR in June 2018. LOF and NAN implementa�on finished 30.12.2021. 30/12/2021
REG (By:02/2018) Estonian Transport Administra�on 100% Completed ECAA will ensure the processing and the distribu�on of the informa�on on the data link capability by the IFPS. - 30/04/2018
ASP (By:02/2018) EANS 100% Completed Implementa�on was finished in June 2018 (SITA 06.04.2018, ARINC 28.06.2018). Procedures implemen�ng the Next Authority process is implemented with Sweden, Finland (2021) and Latvia (2021).
Air-ground data link
implementa�on 30/12/2021
MIL (By:01/2019)
Estonian Air Force (MIL) 0% Not Applicable
Data link capability is not required. - -
ITY-AGVCS2
8,33 kHz Air-Ground Voice Channel Spacing below FL195 Timescales: Entry into force: 07/12/2012 New and upgraded radio equipment: 17/11/2013 New or upgraded radios on State aircra�: 01/01/2014 Interim target for freq. conversions: 31/12/2014 All radio equipment: 31/12/2017 All frequencies converted: 31/12/2018 State aircra� equipped, except those no�fied to EC: 31/12/2018 State aircra� equipped, except those exempted [Art 9(11)]: 31/12/2020
100 Completed
- Tallinn FIR radio renewed according to Implemen�ng Regula�on (EU) No 1079/2012 in December 2015. 31 frequencies converted on 02/01/2020. Estonia has 61 frequencies, from which 49 are converted as of 03/01/2020 (was reported to SAFIRE Data base). 9 frequencies are exempted (shall be converted on 2027), 3 are interna�onal frequencies, which should not be converted.
02/01/2020
REG (By:12/2018) Estonian Transport Administra�on 100% Completed Tallinn FIR radio renewed according to Implemen�ng Regula�on (EU) No 1079/2012 in December 2015. Frequency converted on 02/01/2020. - 02/01/2020
ASP (By:12/2018)
LSSIP Year 2023 Estonia 61 Working Level Agreed
ITY-AGVCS2
8,33 kHz Air-Ground Voice Channel Spacing below FL195 Timescales: Entry into force: 07/12/2012 New and upgraded radio equipment: 17/11/2013 New or upgraded radios on State aircra�: 01/01/2014 Interim target for freq. conversions: 31/12/2014 All radio equipment: 31/12/2017 All frequencies converted: 31/12/2018 State aircra� equipped, except those no�fied to EC: 31/12/2018 State aircra� equipped, except those exempted [Art 9(11)]: 31/12/2020
100 Completed
EANS 100% Completed Frequency converted on 02/01/2020. - 02/01/2020
MIL (By:12/2020) Estonian Air Force (MIL) 100% Completed All of the State aircra� are equipped with 8,33 kHz radios. - 31/12/2018
APO (By:12/2018) TALLINN AIRPORT Ltd. 100% Completed There are 2 working channels on EETN AD, what are converted accordingly. REF EST AIP AD 2.EETN, EETN AD 2.18. Non-8,33 kHz equipped vehicles do not communicate with aircra�s.
- 02/01/2020
Estonian Air Force (MIL) 0% Not Applicable
NATO combined frequency requirements will maintain the 122,100 MHz frequency in 25 kHz channel spacing un�l a suitable alterna�ve is found. - -
ITY-FMTP
Common Flight Message Transfer Protocol (FMTP) Timescales: Entry into force of regula�on: 28/06/2007 All EATMN systems put into service a�er 01/01/09: 01/01/2009 All EATMN systems in opera�on by 20/04/11: 20/04/2011 Transi�onal arrangements: 31/12/2012 Transi�onal arrangements when bilaterally agreed between ANSPs: 31/12/2014
100 Completed
- A common flight message transfer protocol (FMTP) is implemented during a major system upgrade. However, IPver6 is not fully implemented. Connec�ons with Malmö and Stockholm of Sweden are opera�onal since August 2015.
31/12/2018
ASP (By:12/2014) EANS 100% Completed Completed. - 31/12/2018
MIL (By:12/2014)
Estonian Air Force (MIL) 0% Not Applicable
Military ATC do not provide RADAR services - -
NAV03.1
RNAV 1 in TMA Opera�ons Timescales: Ini�al opera�onal capability: 01/01/2001 One SID and STAR per instrument RWY, where established: 25/01/2024 All SIDs and STARs per instrument RWY, where established: 06/06/2030
97 Ongoing
EETN - Tallinn Airport
LSSIP Year 2023 Estonia 62 Working Level Agreed
RNAV 1 procedures and CDA in Tallinn TMA implemented on 30 May 2013. Estonia’s PBN Implementa�on (transi�on) plan has successfully passed consulta�on with Estonian Stakeholders and with Network Manager (NM). The Plan has also been commented by IATA. PBN Implementa�on Plan Ver 1.0 document was approved by CAA and communicated to the neighbouring ATC Centres. Naviga�on infrastructure ra�onaliza�on project was delayed due to economic crises caused by COVID 19, project is ongoing.
21/03/2024
REG (By:06/2030) Estonian Transport Administra�on 100% Completed
The transi�on plan for PBN is approved by NSA in DEC 2020. Naviga�on
Infrastructure Ra�onalisa�on
31/12/2020
ASP (By:06/2030) EANS 96% Ongoing Estonia’s PBN Implementa�on (transi�on) plan has successfully passed consulta�on with Estonian Stakeholders and with Network Manager (NM). The Plan has also been commented by IATA. PBN Implementa�on Plan Ver 1.0 document was approved by CAA and communicated to the neighbouring ATC Centres. Naviga�on infrastructure ra�onalisa�on project is ongoing.
Naviga�on Infrastructure Ra�onalisa�on
21/03/2024
NAV03.2 RNP 1 in TMA Opera�ons Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport There is no inten�on to Implement it because it is not jus�fied par�cularly in terms of the cost/benefit ra�o as RNAV1 is considered to be sufficient. -
REG (By:06/2030)
Estonian Transport Administra�on 0% Not Applicable
There is no inten�on to Implement it because it is not jus�fied par�cularly in terms of the cost/benefit ra�o as RNAV1 is considered to be sufficient. - -
ASP (By:06/2030)
EANS 0% Not Applicable
There is no inten�on to Implement it because it is not jus�fied par�cularly in terms of the cost/benefit ra�o as RNAV1 is considered to be sufficient. - -
NAV10
RNP Approach Procedures to instrument RWY Timescales: Ini�al opera�onal capability: 01/06/2011 Instrument RWY ends without precision approach in EU SES States.: 03/12/2020 Instrument RWY ends served by precision approach.: 25/01/2024
100 Completed
EETN - Tallinn Airport RNP APCH procedures are published and implemented at EETN, EEKE, EEKA, EEPU and EETU aerodromes. EANS PBN Transi�on plan has been dra�ed and submited to CAA and MIL.
21/04/2022
REG (By:01/2024) Estonian Transport Administra�on 100% Completed The na�onal PBN plan is approved by NSA in DEC 2020. - 31/12/2020
ASP (By:01/2024) EANS 100% Completed
LSSIP Year 2023 Estonia 63 Working Level Agreed
NAV10
RNP Approach Procedures to instrument RWY Timescales: Ini�al opera�onal capability: 01/06/2011 Instrument RWY ends without precision approach in EU SES States.: 03/12/2020 Instrument RWY ends served by precision approach.: 25/01/2024
100 Completed
RNP APCH procedures are published and implemented at EETN, EEKE, EEKA, EETU and EEPU aerodromes. PBN Implementa�on (transi�on) plan is approved by ECAA.
RNP APCH procedures
implementa�on on EETN
aerodrome
21/04/2022
NAV12
ATS IFR Routes for Rotorcra� Opera�ons Timescales: Rotorcra� RNP0.3, RNP1 or RNAV1 ATS routes above FL150, where established.: 03/12/2020 One rotorcra� RNP0.3, RNP01 or RNAV1 SID and STAR per instrument RWY, where established.: 25/01/2024 Rotorcra� RNP0.3, RNP1 or RNAV1 ATS routes below FL150, where established.: 25/01/2024 All rotorcra� RNP0.3, RNP01 or RNAV1 SIDs and STARs per instrument RWY, where established.: 06/06/2030
0 Not Applicable
- Tallinn FIR is FRA. ATS IFR routes for rotorcra� opera�on implementa�on are not planned. -
REG (By:06/2030)
Estonian Transport Administra�on 0% Not Applicable
Tallinn FIR is FRA. ATS IFR routes for rotorcra� opera�on implementa�on are not planned, no demand, too exiguous IFR rotocra� traffic. - -
ASP (By:06/2030)
EANS 0% Not Applicable
LLR procedures only in Tallinn CTR are completed. No other plans to implement. - -
LSSIP Year 2023 Estonia 64 Working Level Agreed
Additional Objectives for ICAO ASBU Monitoring
AOM21.1
Direct Rou�ng (Outside Applicability Area) Timescales: - not applicable -
0 Not Applicable
- Estonia is outside for the objec�ve applicability area. FRA is implemented. -
ASP (By:12/2017)
EANS 0% Not Applicable
FRA is implemented. - -
ATC02.2
Implement ground based safety nets - Short Term Conflict Alert (STCA) - level 2 for en-route opera�ons Timescales: Ini�al opera�onal capability: 01/01/2008 Full opera�onal capability: 31/01/2013
100 Completed
- STCA Level II func�on was implemented in 2012 and safety assessment was performed. Safety oversight was conducted on �me.
31/12/2012
ASP (By:01/2013) EANS 100% Completed The EUROCAT 2000 System has STCA implemented and opera�onal (Ini�al Opera�onal Capability). The STCA Level 2 was implemented and opera�onal since 2002. FOC was implemented in March 2012.
- 31/12/2012
ATC02.9
Short Term Conflict Alert (STCA) for TMAs Timescales: Ini�al opera�onal capability: 01/01/2018 Full opera�onal capability: 31/12/2020
100 Completed
- STCA func�on is implemented. 31/12/2012
ASP (By:12/2020) EANS 100% Completed STCA func�on is implemented. - 31/12/2012
ATC16
Implement ACAS II compliant with TCAS II change 7.1 Timescales: Ini�al opera�onal capability: 01/03/2012 Full opera�onal capability: 31/12/2015
100 Completed
- ACAS II compliant with TCAS II change 7.1 is implemented on �me. 04/01/2019
REG (By:12/2015) Estonian Transport Administra�on 100% Completed ECAA has supervised compliance with regulatory provisions for ACAS II (TCAS II version 7.1). - 31/12/2015
ASP (By:03/2012) EANS 100% Completed The ATC staff was trained in December 2015. - 31/12/2015
MIL (By:12/2015) Estonian Air Force (MIL) 100% Completed Estonian Air Force M-28 transport-type aircra� are TCAS II 7.1 equipped. - 04/01/2019
LSSIP Year 2023 Estonia 65 Working Level Agreed
COM10.1
Migrate from AFTN to AMHS (Basic service) Timescales: Ini�al Opera�onal Capability: 01/12/2011 Full Opera�onal Capability: 31/12/2018
100 Completed
- Exis�ng COM centres are upgraded to provide AMHS capability or implement EATMP Communica�ons Gateway (ECG). 31/12/2018
ASP (By:12/2018) EANS 100% Completed The migra�on took place in August 2016. - 31/12/2018
FCM01
Implement enhanced tac�cal flow management services Timescales: Ini�al opera�onal capability: 01/08/2001 Full opera�onal capability: 31/12/2006
100 Completed
- Since May 2008, Estonia is in the IFPS zone. Currently only the FMP is connected to NM. During the major system upgrade, all the requirements were implemented in 2012. FSA, CPR format tuning and tes�ng completed. NM/ETFMS supplies with flight plan related updates that are only available shortly before departure.
30/06/2015
ASP (By:07/2014) EANS 100% Completed All necessary func�onali�es are installed during system upgrade. Tuning, tes�ng and LoA revision completed. - 30/06/2015
ITY-COTR
Implementa�on of ground-ground automated co- ordina�on processes Timescales: Entry into force of Regula�on: 27/07/2006 For pu�ng into service of EATMN systems in respect of no�fica�on and ini�al coordina�on processes: 27/07/2006 For pu�ng into service of EATMN systems in respect of Revision of Coordina�on, Abroga�on of Coordina�on, Basic Flight Data and Change to Basic Flight Data: 01/01/2009 To all EATMN systems in opera�on by 12/2012: 31/12/2012
100 Completed
- Implementa�on of G-G automated co-ordina�on has been finalised within Eurocat 2000 upgrade project in 2012. 31/12/2012
ASP (By:12/2012) EANS 100% Completed OLDI basic messages exchange is implemented. Other ground-ground automated coordina�on processes and the training of ATC personnel have been performed.
- 31/12/2012
MIL (By:12/2012)
Estonian Air Force (MIL) 0% Not Applicable
OLDI not required as EAF currently provides only ADI service. Other ground- ground automated coordina�on is planned. - -
LSSIP Year 2023 Estonia 66 Working Level Agreed
Local Objectives
Note: Local Objectives are addressing solutions that are considered beneficial for specific operating environments, therefore for which a clear widespread commitment has not been expressed yet. They are characterised with no deadline and voluntary applicability area.
AOP14.1 Remote Tower Services Applicability and timescale: Local 40 Ongoing
EETN - Tallinn Airport EANS (not EETN AD) runs rTWR implementa�on project. - The Remote Tower Center is in Tallinn, in EANS headquarters. Two airports' (Kuressaare and Tartu) remote tower installa�ons are ready, governing body Estonian Transporta�on Administra�on has issued aeronau�cal equipment cer�ficate separately for both installa�ons. Remote tower for Tartu aerodrome went fully opera�onal in April 2023, since then the service has been provided only from the remote tower center in Tallinn. Service valida�on ac�vi�es for Kuressaare aerodrome's remote tower started in November 2023. Kuressaare remote tower is expected to be opera�onal in March 2024. - Future: The Remote Tower Centre is planned for all four Estonian regional aerodromes (Tartu, Kuressaare, Kärdla and Pärnu (not planned for EETN AD)). - For daily service provision.
31/03/2024
REG (By:) Estonian Transport Administra�on Ongoing EANS (not EETN AD) runs rTWR implementa�on project. - The Remote Tower Center is in Tallinn, in EANS headquarters. Two airports' (Kuressaare and Tartu) remote tower installa�ons are ready, governing body Estonian Transporta�on Administra�on has issued aeronau�cal equipment cer�ficate separately for both installa�ons. Remote tower for Tartu aerodrome went fully opera�onal in April 2023, since then the service has been provided only from the remote tower center in Tallinn. Service valida�on ac�vi�es for Kuressaare aerodrome's remote tower (rAFIS) started in November 2023. Kuressaare remote tower is expected to be opera�onal in March 2024. - Future: The Remote Tower Centre is planned for all four Estonian regional aerodromes (Tartu, Kuressaare, Kärdla and Pärnu (not planned for EETN AD)). - For daily service provision.
- 31/03/2024
ASP (By:) EANS Ongoing EANS (not EETN AD) runs rTWR implementa�on project. - The Remote Tower Center is in Tallinn, in EANS headquarters. Two airports' (Kuressaare and Tartu) remote tower installa�ons are ready, governing body Estonian Transporta�on Administra�on has issued aeronau�cal equipment cer�ficate separately for both installa�ons. Remote tower for Tartu aerodrome went fully opera�onal in April 2023, since then the service has been provided only from the remote tower center in Tallinn. Service valida�on ac�vi�es for Kuressaare aerodrome's remote tower were star�ng in November 2023. Kuressaare remote tower is expected to be opera�onal in March 2024. - The Remote Tower Centre is planned for all four Estonian regional aerodromes – Tartu, Kuressaare, Kärdla and Pärnu (not planned for EETN AD). - For daily service provision.
- 31/03/2024
APO (By:) TALLINN AIRPORT Ltd. Ongoing
LSSIP Year 2023 Estonia 67 Working Level Agreed
AOP14.1 Remote Tower Services Applicability and timescale: Local 40 Ongoing
EANS (not EETN AD) runs rTWR implementa�on project. Project is connected to Tallinn Airports Ltd-s ac�vi�es, since all regional airports are under Tallinn Airport Ltd.
- 31/03/2024
AOP15
Enhanced traffic situa�onal awareness and airport safety nets for the vehicle drivers Applicability and timescale: Local
0 Not Applicable
- Not planned. -
REG (By:04/2019)
Estonian Transport Administra�on Not Applicable
Not planned. - - APO (By:)
TALLINN AIRPORT Ltd. Not Applicable
Not planned. - -
AOP16 Guidance assistance through airfield ground ligh�ng Applicability and timescale: Local
0 Not Applicable
- Not planned. -
ASP (By:)
EANS Not Applicable
Not planned. - - APO (By:)
TALLINN AIRPORT Ltd. Not Applicable
Not planned. - -
AOP17
Provision/integra�on of departure planning informa�on to NMOC Applicability and timescale: Local
0 Not Applicable
- NA for State. EANS and Tallinn airport postponed the implementa�on of A-CDM at Tallinn aerodrome. A-CDM should be implemented in the frame of project Airport 4.0 and implementa�on probably not earlier than 31.12.2030.
-
ASP (By:)
EANS Not Applicable
EANS and Tallinn airport postponed the implementa�on of A-CDM at Tallinn aerodrome. A-CDM should be implemented in the frame of project Airport 4.0 and implementa�on probably not earlier than 31.12.2030.
- -
AOP18 Runway Status Lights (RWSL) Applicability and timescale: Local
0 Not Applicable
- Traffic density does not jus�fy the implementa�on of the Objec�ve and we`ll keep status N/A. -
REG (By:)
LSSIP Year 2023 Estonia 68 Working Level Agreed
AOP18 Runway Status Lights (RWSL) Applicability and timescale: Local
0 Not Applicable
Estonian Transport Administra�on Not Applicable
Traffic density does not jus�fy the implementa�on of the Objec�ve. - - ASP (By:)
EANS Not Applicable
Traffic density does not jus�fy the implementa�on of the Objec�ve. - - APO (By:)
TALLINN AIRPORT Ltd. Not Applicable
Traffic density does not jus�fy the implementa�on of the Objec�ve. - -
AOP21
Wake Turbulence Separa�ons for Arrivals based on Sta�c Aircra� Characteris�cs (S-PWS-A) Applicability and timescale: Local
0 Not Applicable
- No opera�onal need at the moment. -
ASP (By:)
EANS Not Applicable
No opera�onal needs at the moment. - -
AOP23 Integrated runway sequence for full traffic op�miza�on on single and mul�ple runway airports Applicability and timescale: Local
0 Not yet planned
EETN - Tallinn Airport N/A for EETN AD, Tallinn Airport is not listed in CP1 Geographical Scope. AD has not planned it (yet). -
ASP (By:)
EANS Not yet planned
Depends on Tallinn airport plans. - - APO (By:)
TALLINN AIRPORT Ltd. Not yet planned
Not yet planned. - -
AOP25 De-icing management tool Applicability and timescale: Local 0 Not yet
planned
EETN - Tallinn Airport Development according to SP-s ac�vi�es. -
ASP (By:)
EANS Not yet planned
Further plans depend on EETN airport. - - APO (By:)
TALLINN AIRPORT Ltd. Not yet planned
Not yet planned. - -
LSSIP Year 2023 Estonia 69 Working Level Agreed
AOP26
Reduced separa�on based on local Runway Occupancy Time (ROT) characterisa�on Applicability and timescale: Local
0 Not Applicable
- N/A, not planned either. -
ASP (By:)
EANS Not Applicable
Local objec�ve, not planned. - -
ATC18 Mul�-Sector Planning En-route - 1P2T Applicability and timescale: Local 0 Not
Applicable
- N/A, but objec�ve might come into the plans, in case FINEST realizes. -
ASP (By:01/2030)
EANS Not Applicable
N/A - -
ATC20 Enhanced STCA with down-linked parameters via Mode S EHS Applicability and timescale: Local
0 Not Applicable
- Estonia is outside of applicability area. SFL via Mode-S EHS is implemented. No need for enhancement of STCA with selected flight level is iden�fied.
-
REG (By:01/2030)
Estonian Transport Administra�on Not Applicable
Estonia is outside of applicability area. - - ASP (By:01/2030)
EANS Not Applicable
SFL via Mode S EHS is implemented. No need for enhancement of STCA with selected flight level is iden�fied. - -
ATC26 Point Merge in complex TMA Applicability and timescale: Local 0 Not
Applicable
EETN - Tallinn Airport Not planned. -
ASP (By:)
EANS Not Applicable
No plans to implement. - -
COM13 Air Traffic Services (ATS) datalink using SatCom Class B Applicability and timescale: Local 0 Not yet
planned
- Subject to local need, It has not yet been decided whether ANSP will par�cipate in the test phase. -
REG (By:)
Estonian Transport Administra�on Not Applicable
LSSIP Year 2023 Estonia 70 Working Level Agreed
COM13 Air Traffic Services (ATS) datalink using SatCom Class B Applicability and timescale: Local 0 Not yet
planned
N/A, and it has not yet been decided whether ANSP will par�cipate in the test phase. - -
ASP (By:)
EANS Not yet planned
NYP, lack of resources at the moment. - -
ENV02 Airport Collabora�ve Environmental Management Applicability and timescale: Local 100 Completed
EETN - Tallinn Airport Tallinn Airport has implemented Collabora�ve Environmental Management (CEM). 31/12/2016
ASP (By:) EANS Completed Completed - 31/12/2016
APO (By:) TALLINN AIRPORT Ltd. Completed Completed - 31/12/2016
ENV03 Con�nuous Climb Opera�ons (CCO) Applicability and timescale: Local 0 Not
Applicable
EETN - Tallinn Airport Not applicable at State level. Nevertheless, EETN AD has got the noise abatement procedures, what are applicable below the al�tude of 3000 � AMSL. REF EST AIP EETN AD 2.21.
-
ASP (By:)
EANS Not Applicable
Not applicable at State level. - - APO (By:)
TALLINN AIRPORT Ltd. Not Applicable
Not applicable at State level. - -
NAV11.1
Implement precision approach procedures using GBAS CAT II based on GAST C Applicability and timescale: Local
0 Not Applicable
- Subject to local need, not planned. -
REG (By:)
Estonian Transport Administra�on Not Applicable
ANSP has no plans to implement. - - ASP (By:)
EANS Not Applicable
EANS has no plans to implement precision approach procedures using GBAS CAT II based on GAST C. Considering the traffic capacity, it is not reasonable. - -
LSSIP Year 2023 Estonia 71 Working Level Agreed
SAF10.1 Implement measures to reduce the risk to aircra� opera�ons caused by airspace infringements Applicability and timescale: Local
30 Ongoing
- Ac�vity ongoing. 31/12/2030
REG (By:) Estonian Transport Administra�on Ongoing NIL - 31/12/2030
ASP (By:) EANS Ongoing According to EAPAIRR ques�onnaire, some of the parts of the European Ac�on Plan for Airspace Infringement Risk Reduc�on, are completed, some are ongoing and not yet planned.
- 31/12/2030
AIS (By:) EANS Ongoing Improving availability and access of VFR en-route charts ongoing, planned to analyse GPS moving maps on portable devices. AIM1 in SAF EAPAIRR ques�onnaire ongoing.
- 31/12/2025
SAF11.1 Improve Runway Safety by Preven�ng Runway Excursions Applicability and timescale: Local 100 Completed
- Since not all the ac�vi�es are reasonable to implement and some are constantly ongoing (others completed), we have considered this area Completed. 31/12/2023
REG (By:) Estonian Transport Administra�on Completed Some ASP_EANS ac�vi�es are constantly ongoing, others are completed. It has decided not to plan Approach Path Management (depending on the future traffic types/amount- thus plans might change).
- -
ASP (By:) EANS Completed GAPPRE Recommenda�ons ANSP3 and ANSP6 are constantly ongoing as they are part of the safety everyday work in ANSP. Other Recommenda�ons for ANSP completed.
- -
APO (By:) TALLINN AIRPORT Ltd. Completed Relevant/selected safety recommenda�ons from the Global Ac�on Plan for the Preven�on of Runway Excursions for their relevance against the local condi�ons and specific context have been assessed and implemented. Approach Path Management is not planned.
- 31/12/2023
LSSIP Year 2023 Estonia 72 Working Level Agreed
Annex A: Specialists involved in the ATM implementa�on repor�ng for Estonia
LSSIP Focal Points Organisa�on Name
LSSIP Na�onal Focal Point Estonian Transport Administra�on
Moonika KÄST
LSSIP Focal Point for NSA Estonian Transport Administra�on
Moonika KÄST
LSSIP Focal Point for ANSP Estonian ANS Kei� MERIKÜLL
LSSIP Focal Point for Airport Tallinn Airport Ilona SOITU
LSSIP Focal Point for Military Estonian Defence Forces Air Force
David-Andreas MELLOV
LSSIP Focal point for MET Estonian Environment Agency Jüri JOONAS
Other Focal Points Organisa�on Name
Focal Point for NETSYS EANS (Estonian ANS) Brenda ROOSIMAA
Focal Point for SUR EANS (Estonian ANS) Steve SÕERUER
Focal Point for SDP/CP1 EANS (Estonian ANS) Kei� MERIKÜLL
Focal Point for U-space Estonian Transport Administra�on
Priit RIFK
LSSIP Year 2023 Estonia 73 Working Level Agreed
Annex B: Ques�onnaires
1. Surveillance (SUR) Ques�onnaire This Annex is not published in the LSSIP Document, but is available in the LSSIP Tool, which can be made available upon request to Focal Point and/or Contact Person.
LSSIP Year 2023 Estonia 74 Working Level Agreed
2. EAPAIRR and GAPPRE Ques�onnaire
European Action Plan for Airspace Infringement Risk Reduction
This Annex is not published in the LSSIP Document, but is available in the LSSIP Tool, which can be made available upon request to Focal Point and/or Contact Person.
LSSIP Year 2023 Estonia 75 Working Level Agreed
3. SESAR Solu�ons implemented in a voluntary way3
This Annex is not published in the LSSIP Document, but is available in the LSSIP Tool, which can be made available upon request to Focal Point and/or Contact Person.
3 Referred as ‘Non-committed’ SESAR solutions in the MP L3 Report.
LSSIP Year 2023 Estonia 76 Working Level Agreed
Annex C: Implementa�on Objec�ves’ links with other plans
The table below (extracted from the MPL3 Plan 2023) shows for each implementation objective, the mapping of the L3 implementation Objectives to the corresponding SESAR Essential Operational Changes, the SESAR Solutions, the Deployment Program families, the ICAO ASBU, the EASA EPAS, the Network Strategy Plan, the Airspace Architecture Study Transition Plan (AAS TP) Milestones and the SESAR Key Features.
Level 3
Implementation Objective
SESAR Solution
SDP Family
OI Steps/ Enablers
ICAO ASBUs EPAS NSP AAS TP KF
ATC21 – Composite surveillance ADS- B/WAM
#114 -
CTE-S06, CTE-S05,
CTE-S03a, CTE-S03b, CTE-S04a
ASUR- B0/1
ASUR- B0/2
RMT.067 9
RMT.051 9
SO8/3 SO8/4 AM-1.17 EAI
COM10.2 – Extended AMHS - - CTE-C06c COMI-
B0/7 - SO7/4 - EAI
COM11.1 – Voice over Internet Protocol (VoIP) in En-Route
- - CTE-C05a CTE‐C05b
COMI- B2/1 - SO8/4 AM-1.3 EAI
COM11.2 – Voice over Internet Protocol (VoIP) in Airport/Terminal
- - CTE-C05a CTE‐C05b
COMI- B2/1 - SO8/4 - EAI
COM13 – Air Traffic Services (ATS) datalink using SatCom Class B
#109 - POI-0018- COM
COMI- B1/3 - - AM-1.16 EAI
ITY-ACID – Aircraft identification - - GSURV‐0101 - - SO8/2 - EAI
ITY-AGDL – Initial ATC air-ground data link services
- - AUO-0301
COMI- B0/4
COMI- B1/2
RMT.052 4
SO4/1 SO8/3 AM-1.1 EAI
ITY-AGVCS2 – 8.33 kHz Air-Ground Voice Channel Spacing below FL195
- - CTE-C01a - - SO8/1 - EAI
NAV10 – RNP Approach Procedures to instrument RWY
#103 -
AOM-0602 AOM-0604 CTE-N06a CTE-N06b
APTA- B0/1
APTA- B1/1
NAVS- B0/2
RMT.044 5
RMT.064 3
SO6/5 - AAT S
NAV11.2 – Implement precision approach procedures using GBAS CAT II/III based
#55 - AO-0505-A NAVS- B1/1
RMT.068 2 - - HPA
O
LSSIP Year 2023 Estonia 77 Working Level Agreed
Level 3
Implementation Objective
SESAR Solution
SDP Family
OI Steps/ Enablers
ICAO ASBUs EPAS NSP AAS TP KF
on GPS L1 and/or GALILEO E1
Level 3 Implementation
Objective
SESAR Solution
SDP Family
OI Steps/Enabler
s
ICAO ASBUs EPAS NSP AAS TP KF
AOM13.1 – Harmonise OAT and GAT handling
- - AOM-0301 AOM-0303 - - SO6/2 - OAN
S
AOP11.1 – Initial Airport Operations Plan
#21 2.2.1 AO-0801-A ACDM- B1/1 - SO6/2 - HPA
O
AOP11.2 – Extended Airport Operations Plan
#21 2.2.2
AO-0801-A, AO-0802-A, AO-0803, DCB-0310
ACDM- B1/1 - SO5/2 - HPA
O
AOP17 – Provision/integration of DPI to NMOC
#61 - DCB-0304 NOPS- B0/4 - - - HPA
O
COM12 – NewPENS - - CTE‐C06b COMI- B1/1 -
SO2/3, SO2/4, SO8/3, SO8/4
- EAI
FCM03 – Collaborative flight planning
- - IS-0102 NOPS- B0/2 - SO4/3 AM-1.14 OAN
S
FCM04.2 – Enhanced Short Term ATFCM Measures
#17 4.1.1 DCB-0308 NOPS- B1/1 - SO4/5 AM-1.11 OAN
S
FCM06.1 – Automated Support for Traffic Complexity Assessment and Flight Planning interfaces
#19 PJ.18-
02c 4.3.1
CM-0101 CM-0103-A
IS-0102
NOPS- B0/2
NOPS- B1/4
- SO4/3 SO4/5 AM-1.13 OAN
S
FCM10 – Interactive rolling NOP
#18 #20 4.2.1 DCB-0102
DCB-0208
NOPS- B1/2
NOPS- B1/9
- SO2/2, SO4/2, SO4/5
AM-1.9 AM-1.12
OAN S
FCM11.1 – Initial AOP/NOP Information Sharing
#20 #21 4.2.2 DCB-0103-A
AO-0801-A NOPS- B0/4 -
SO4/4, SO4/5, SO5/2
AM-1.12 OAN S
LSSIP Year 2023 Estonia 78 Working Level Agreed
Level 3 Implementation
Objective
SESAR Solution
SDP Family
OI Steps/Enabler
s
ICAO ASBUs EPAS NSP AAS TP KF
FCM11.2 – AOP/NOP integration
#18 #20 #21
4.4.1
AO-0801–A, AO-0802–A,
AO-0803, DCB-0310,
DCB-0103-A, DCB-0208
NOPS- B1/3 -
SO4/4, SO4/5, SO5/2
AM-1.12 OAN S
INF10.2 – Stakeholders’ SWIM PKI and cyber security
#46 5.2.1 IS-0901-A SWIM- B2/3
RMT.072 0 SO2/4 AM-1.5 EAI
INF10.3 – Aeronautical Information Exchange - Airspace structure service
#46 5.3.1 IS-0901-A - - SO2/4 AM-1.5 EAI
INF10.4 – Aeronautical Information Exchange - Airspace availability service
#46 5.3.1 IS-0901-A - - SO2/4 AM-1.5 EAI
INF10.5 – Aeronautical Information Exchange - Airspace Reservation (ARES) service
#46 5.3.1 IS-0901-A - - SO2/4 AM-1.5 EAI
INF10.6 – Aeronautical Information Exchange - Digital NOTAM service
#34 #46 5.3.1 IS-0901-A
IS-0205 - - SO2/4 AM-1.5 EAI
INF10.7 – Aeronautical Information Exchange - Aerodrome Mapping information exchange service
#34 #46 5.3.1 IS-0901-A
IS-0205 - - SO2/4 AM-1.5 EAI
INF10.8 – Aeronautical Information Exchange - Aeronautical Information Features service
#34 #46 5.3.1 IS-0901-A
IS-0205 - - SO2/4 AM-1.5 EAI
INF10.9 – Meteorological Information Exchange - Volcanic ash concentration service
#34 #35 #46
5.4.1 IS-0901-A IS-0205
MET-0101 - - SO2/4 AM-1.5 EAI
LSSIP Year 2023 Estonia 79 Working Level Agreed
Level 3 Implementation
Objective
SESAR Solution
SDP Family
OI Steps/Enabler
s
ICAO ASBUs EPAS NSP AAS TP KF
INF10.10 – Meteorological Information Exchange - Aerodrome Meteorological information Service
#34 #35 #46
5.4.1 IS-0901-A IS-0205
MET-0101 - - SO2/4 AM-1.5 EAI
INF10.11 – Meteorological Information Exchange - En-Route and Approach Meteorological information service
#34 #35 #46
5.4.1 IS-0901-A IS-0205
MET-0101 - - SO2/4 AM-1.5 EAI
INF10.12 – Meteorological Information Exchange - Network Manager Meteorological Information
#34 #35 #46
5.4.1 IS-0901-A IS-0205
MET-0101 - - SO2/4 AM-1.5 EAI
INF10.13 – Cooperative Network Information Exchange - ATFCM Tactical Updates Service
#46 5.5.1 IS-0901-A - - SO2/4 AM-1.5 EAI
INF10.14 – Cooperative Network Information Exchange - Flight Management Service
#46 5.5.1 IS-0901-A - - SO2/4 SO5/2 AM-1.5 EAI
INF10.15 – Cooperative Network Information Exchange - Measures Service
#46 5.5.1 IS-0901-A - - SO2/4 SO4/5 AM-1.5 EAI
INF10.16 – Cooperative Network Information Exchange - Short Term ATFCM Measures services
#46 5.5.1 IS-0901-A - - SO2/4 SO4/5 AM-1.5 EAI
INF10.17 – Cooperative Network Information Exchange - Counts service
#46 5.5.1 IS-0901-A - - SO2/4 AM-1.5 EAI
INF10.18 – Flight Information Exchange -Filing Service
#46 5.6.1 AUO-0207 FICE- B2/2 - SO2/4 AM-1.5 EAI
INF10.19 – Flight Information Exchange #46 5.6.1 AUO-0207 FICE-
B2/4 - SO2/4 AM-1.5 EAI
LSSIP Year 2023 Estonia 80 Working Level Agreed
Level 3 Implementation
Objective
SESAR Solution
SDP Family
OI Steps/Enabler
s
ICAO ASBUs EPAS NSP AAS TP KF
- Flight Data Request Service
INF10.20 – Flight Information Exchange - Notification Service
#46 5.6.1 AUO-0207 FICE- B2/5 - SO2/4 AM-1.5 EAI
INF10.21 – Flight Information Exchange - Publication Service
#46 5.6.1 AUO-0207 FICE- B2/6 - SO2/4 AM-1.5 EAI
INF10.22 – Flight Information Exchange - Trial Service
#46 5.6.1 AUO-0219 FICE- B2/3 - SO2/4 AM-1.5 EAI
INF10.23 – Flight Information Exchange - Extended AMAN SWIM Service
#46 5.6.1 AUO-0207
DAIM- B2/1
SWIM- B3/1
- SO2/4 AM-1.5 EAI
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
INF07 – Electronic Terrain and Obstacle Data (e-TOD)
- - AIMS-16
DAIM- B1/3
DAIM- B1/4
RMT.070 3
RMT.072 2
SO2/5 - EAI
INF11.1 – Enhanced Ground Weather Management System (GWMS) as local 4DWxCube
PJ.18- 04b-01 - POI-0044-
MET - - - - EAI
INF11.2 – Cb-global capability and service
PJ.18- 04b-02 - POI-0048-
MET - - - - EAI
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
AOP04.1 – A-SMGCS Surveillance Service (former ICAO Level 1)
#70 #110 -
AO-0201 AO-0201-A POI-0071-
SUR
SURF- B0/2
MST.002 9 SO6/6 - HPA
O
LSSIP Year 2023 Estonia 81 Working Level Agreed
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
AOP04.2 – A-SMGCS RMCA (former ICAO Level 2)
- - AO-0102 SURF- B0/3
MST.002 9 SO6/6 - HPA
O
AOP05 – Airport CDM - -
AO-0501, AO-0601, AO-0602, AO-0603, TS-0201
ACDM- B0/1
ACDM- B0/2
NOPS- B0/4
- SO6/4 - HPA O
AOP10 – Time Based Separation #64 - AO-0303 WAKE-
B2/7 - SO6/5 - HPA O
AOP12.1 – Airport Safety Nets #02 2.3.1 AO-0104-A SURF-
B1/3 MST.002
9 SP6/6 - HPA O
AOP13 – Automated assistance to Controller for Surface Movement planning and routing
#22 #53 - AO-0205
TS-0202 SURF- B1/4
MST.002 9 SO6/6 - HPA
O
AOP15 – Safety Nets for vehicle drivers #04 - AO-0105
AO-0204 SURF- B2/2
MST.002 9 - - HPA
O
AOP16 – Guidance assistance through airfield lighting
#47 - AO-0222-A SURF- B1/1
MST.002 9 - - HPA
O
AOP18 – Runway Status Lights #01 - AO-0209
SURF- B2/2, SURF- B2/3-
MST.002 9 - - HPA
O
AOP19 – Departure Management Synchronised with Pre-departure sequencing
#53 #106 2.1.1 AO-0602
TS-0201 RSEQ- B0/2 - - - HPA
O
AOP20 – Wake Turbulence Separations for Departures based on Static Aircraft Characteristics (S- PWS-D)
PJ.02-01- 06 - AO-0323 - RMT.047
6 - - HPA O
AOP21 – Wake Turbulence Separations for Arrivals based on Static Aircraft Characteristics (S- PWS-A)
PJ.02-01- 04 - AO-0306 WAKE-
B3/3 RMT.047
6 - - HPA O
LSSIP Year 2023 Estonia 82 Working Level Agreed
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
AOP22 – Minimum pair separations based on SRP
PJ.02-03 - AO-0309 - - - - HPA O
AOP23 – Integrated runway sequence for full traffic optimization on single and multiple runway airports
PJ.02-08- 01 - TS-0301 RSEQ-
B2/1 - - - HPA O
AOP24 – Optimised use of runway configuration for multiple runway airports
PJ.02-08- 02 - TS-0313 - - - - HPA
O
AOP25 – De-icing Management Tool #116 - POI-0070-
AO - - - - HPA O
AOP26 – Reduced separation based on local Runway Occupancy Time (ROT) characterisation
PJ.02-08- 03 - AO-0337 - - - - HPA
O
ATC07.1 – Arrival management tools - - TS-0102 RSEQ-
B0/1 - SO4/1 - AAT S
ATC19 – Enhanced AMAN-DMAN integration
#54 1.2.1 TS-0308 RSEQ- B2/1 - SO6/5
SO4/1 - EAI
ATC26 – Point Merge in complex TMA #107 - AOM-0601 RSEQ-
B0/3 - - - AAT S
ENV01 – Continuous Descent Operations #11 -
AOM-0701 AOM-0702-
A
APTA- B0/4
APTA- B1/4
- SO6/5 - AAT S
ENV02 – Airport Collaborative Environmental Management
- - AO-0703, AO-0705, AO-0706
- - - - HPA O
ENV03 – Continuous Climb Operations - - AOM-0703
APTA- B0/5
APTA- B1/5
- SO6/5 - AAT S
NAV03.1 – RNAV1 in TMA Operations #62 - AOM-0601
CTE-N08 APTA- B0/2
RMT.044 5 SO6/5 - AAT
S
NAV03.2 – RNP1 in TMA Operations #09 - AOM-0603
AOM-0605 APTA- B1/2
RMT.044 5 SO6/5 - AAT
S
LSSIP Year 2023 Estonia 83 Working Level Agreed
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
#51 PJ.14-03-
04
POI-0032- NAV
NAV11.1 – GLS CAT II operations using GBAS GAST-C
#119 - AO-0506 NAVS- B1/1
RMT.068 2
RMT.379 - - HPA
O
SAF11.1 – Improve runway safety by preventing runway excursions
- - - - - - - HPA O
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
AOM19.4 – Management of Pre- defined Airspace Configurations
#31 #66 3.1.2
AOM-0202- A
AOM-0206- A
CM-0102-A
FRTO- B1/4, NOPS- B1/6
- SO3/2 SO3/3
AM-1.10 AM-1.8-
OAN S
AOM19.5 – ASM and A-FUA
#31 #66 3.1.1
AOM-0202 AOM-0202-
A AOM-0206-
A
NOPS B1/5, NOPS B0/1, FRTO B1/3, FRTO B0/2
- SO3/2 SO3/3
AM-1.10 AM-1.8
OAN S
AOM21.2 – Initial Free Route Airspace
#32 #33 #66
3.2.1 AOM-0501 AOM-0505 CM-0102-A
FRTO- B1/1 - SO3/1
SO3/4 AM-1.10 AM-5.1
AAT S
AOM21.3 – Enhanced Free Route Airspace Operations
#33 PJ.06-01 3.2.2 AOM-0501
AOM-0505 FRTO- B2/3 - SO3/1
SO3/4 AM-1.6 AM-1.7
AAT S
ATC12.1 – MONA, TCT and MTCD
#27 #104 -
CM-0202, CM-0203, CM-0205,
CM-0207-A
FRTO- B0/4
FRTO- B1/5
- SO3/1 SO4/1
AM-1.15 AM-5.1
AAT S
ATC15.1 – Initial Extension of AMAN to En-route
- - TS-0305 - - SO4/1 - AAT S
ATC15.2 – Arrival Management #05 1.1.1 TS-0305-A RSEQ-
B1/1 - SO4/1 AM-1.3 AAT S
LSSIP Year 2023 Estonia 84 Working Level Agreed
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
Extended to En-route Airspace
NOPS- B1/8
ATC18 – Multi Sector Planning En-route – 1P2T
#63 #118
- CM-0301 FRTO-
B1/6 - SO4/1 AM-4.3 AM-5.1
AAT S
ITY-FMTP – Apply a common flight message transfer protocol (FMTP)
- - CTE-C06 - - SO8/3 AM-1.3 EAI
SAF10.1 – Implement measures to reduce the risk to aircraft operations caused by airspace infringements
- - - - SI.2025 - - AAT S
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
ATC02.8 – Ground based safety nets - - CM-0801
SNET- B0/2 SNET- B0/3 SNET- B0/4
- SO4/1 - AAT S
ATC20 – Enhanced STCA with DAP via Mode S EHS
#69 - CM-0807-A SNET- B1/1
MST.003 0 SO7/2 - AAT
S
ATC22 – Initial Air- Ground Trajectory Information Sharing (Airborne Domain)
#115 6.1.1 IS-0303-A - RMT.068 2 SO4/5 AM-1.2 EAI
ATC23 – Initial Air- Ground Trajectory Information Sharing (Ground Domain)
#115 PJ.18- 06b1
6.1.2 IS-0303-A - RMT.068 2 SO4/5 AM-1.2 EAI
ATC24 – Network Manager Trajectory Information Enhancement
PJ.18- 06b1 6.2.1 POI-0011-IS
POI-0013-IS - RMT.068 2 SO4/5 - EAI
ATC25 – Initial Trajectory #115 6.3.1 IS-0303-A - MST.003
1 AM-1.2 EAI
LSSIP Year 2023 Estonia 85 Working Level Agreed
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
Information Sharing ground distribution
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
NAV12 – ATS IFR Routes for Rotorcraft Operations
#113 - AOM-0810 APTA- B0/6
MST.003 1 SO6/5 - AAT
S
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
- - - - - - - - -
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
AOP14.1 – Remote Tower Services
#12 #13 #52 #71 -
SDM-0201 SDM-0204 SDM-0205
RATS- B1/1
RMT.062 4 SO6/5 - HPA
O
AOP14.2 – Multiple Remote Tower Module
PJ.05-02 - SDM-0207 RATS- B1/1
RMT.062 4 SO6/5 - HPA
O
LSSIP Year 2023 Estonia 86 Working Level Agreed
Annex D: Na�onal stakeholders organisa�on charts
Structure of Estonian Transport Administration
LSSIP Year 2023 Estonia 87 Working Level Agreed
Structure of EANS
LSSIP Year 2023 Estonia 88 Working Level Agreed
Structure of AS Tallinna Lennujaam
LSSIP Year 2023 Estonia 89 Working Level Agreed
Structure of MET
LSSIP Year 2023 Estonia 90 Working Level Agreed
Structure of MIL
LSSIP Year 2023 Estonia 91 Working Level Agreed
Annex E: Glossary of Terms
This Annex mainly shows the abbreviations that are specific to the LSSIP Document for Estonia.
Other general abbreviations are in the Acronyms and Abbreviations document in:
https://www.eurocontrol.int/airial/
Term Description
AF ATM Functionality
EANS Estonian Air Navigation Services (Estonian ANS)
ESTEA Estonian Environment Agency
LOF Log-On Forwarding message
NAMCON The Northern Europe Aviation Meteorology Consortium
NAN Next Authority Notified message
NEFAB North European Functional Airspace Block
NEFRA North European Free Route Airspace
NSA National Supervisory Authority
rAFIS Remote AFIS
rTWR Remote TWR
LSSIP 2023_WLA_EE Final Audit Report 2024-04-15
Created: 2024-04-11
By: Moonika Käst (moonika.kast@transpordiamet.ee)
Status: Signed
Transaction ID: CBJCHBCAABAAps3iHTQFh1AO4MazHVthwhYDl2rsx_UZ
"LSSIP 2023_WLA_EE" History Document created by Moonika Käst (moonika.kast@transpordiamet.ee) 2024-04-11 - 7:41:38 AM GMT
Document emailed to null TRAM (yllar.salumae@transpordiamet.ee) for signature 2024-04-11 - 7:43:18 AM GMT
Document emailed to null EANS (ivar.vark@eans.ee) for signature 2024-04-11 - 7:43:18 AM GMT
Document emailed to null KAUR (taimar.ala@envir.ee) for signature 2024-04-11 - 7:43:19 AM GMT
Document emailed to AS TLL (riivo.tuvike@tll.aero) for signature 2024-04-11 - 7:43:19 AM GMT
Document emailed to null MIL (david-andreas.mellov@mil.ee) for signature 2024-04-11 - 7:43:19 AM GMT
Email viewed by null TRAM (yllar.salumae@transpordiamet.ee) 2024-04-11 - 7:52:55 AM GMT
Signer null TRAM (yllar.salumae@transpordiamet.ee) entered name at signing as Üllar Salumäe 2024-04-11 - 7:53:56 AM GMT
Document e-signed by Üllar Salumäe (yllar.salumae@transpordiamet.ee) Signature Date: 2024-04-11 - 7:53:58 AM GMT - Time Source: server
Email viewed by null MIL (david-andreas.mellov@mil.ee) 2024-04-11 - 8:09:56 AM GMT
Document signing delegated to Pirje Reede, käsundusallohvitser (pirje.reede@mil.ee) by null MIL (david- andreas.mellov@mil.ee) 2024-04-11 - 8:12:46 AM GMT
Document emailed to Pirje Reede, käsundusallohvitser (pirje.reede@mil.ee) for signature 2024-04-11 - 8:12:46 AM GMT
Email viewed by null EANS (ivar.vark@eans.ee) 2024-04-11 - 10:05:41 AM GMT
Signer null EANS (ivar.vark@eans.ee) entered name at signing as Ivar Värk, CEO EANS 2024-04-11 - 10:08:23 AM GMT
Document e-signed by Ivar Värk, CEO EANS (ivar.vark@eans.ee) Signature Date: 2024-04-11 - 10:08:25 AM GMT - Time Source: server
Email viewed by Pirje Reede, käsundusallohvitser (pirje.reede@mil.ee) 2024-04-11 - 11:21:18 AM GMT
Document signing delegated to Toomas Susi (toomas.susi@mil.ee) by Pirje Reede, käsundusallohvitser (pirje.reede@mil.ee) 2024-04-11 - 11:28:01 AM GMT
Document emailed to Toomas Susi (toomas.susi@mil.ee) for signature 2024-04-11 - 11:28:01 AM GMT
Email viewed by Toomas Susi (toomas.susi@mil.ee) 2024-04-11 - 11:28:27 AM GMT
Document e-signed by Toomas Susi (toomas.susi@mil.ee) Signature Date: 2024-04-11 - 11:29:10 AM GMT - Time Source: server
Email viewed by AS TLL (riivo.tuvike@tll.aero) 2024-04-15 - 1:25:58 PM GMT
Signer AS TLL (riivo.tuvike@tll.aero) entered name at signing as Riivo Tuvike 2024-04-15 - 1:31:49 PM GMT
Document e-signed by Riivo Tuvike (riivo.tuvike@tll.aero) Signature Date: 2024-04-15 - 1:31:51 PM GMT - Time Source: server
Email viewed by null KAUR (taimar.ala@envir.ee) 2024-04-15 - 1:39:37 PM GMT
Signer null KAUR (taimar.ala@envir.ee) entered name at signing as Taimar Ala 2024-04-15 - 1:44:21 PM GMT
Document e-signed by Taimar Ala (taimar.ala@envir.ee) Signature Date: 2024-04-15 - 1:44:23 PM GMT - Time Source: server
Agreement completed. 2024-04-15 - 1:44:23 PM GMT
LSSIP Year 2023 Estonia Working Level Agreed
LSSIP Year 2023 Estonia Working Level Agreed
Foreword
The EUROCONTROL Local Single Sky Implementa�on (LSSIP) is a long-standing process celebra�ng its 30th anniversary. Its main goal is to improve the overall streamlined planning process in avia�on and in ATM, allowing avia�on stakeholders to deploy the agreed set of technological and infrastructure evolu�ons in a �mely manner and put the new func�onali�es into opera�ons in an orchestrated way across Europe.
The usage of the common LSSIP+ tool to gather data from the ATM stakeholders is a very good showcase of our collec�ve efforts, EUROCONTROL and SDM, in advancing the European ATM Network in support of our opera�onal stakeholders, moving towards the single value chain.
The LSSIP process is con�nuously improving the planning and repor�ng accuracy and consistency. It ensures the regular monitoring of the implementa�on of all func�onali�es.
The opera�onal stakeholders are facing the challenges of traffic growth, capacity and constantly increasing sustainability requirements. The need to maintain a process and pla�orm for the European avia�on community which provides a visibility of their plans and progress within the agreed �meline is stronger than ever. The con�nuous engagement in the LSSIP process shows the commitment towards a robust unified planning and monitoring process of the European ATM modernisa�on.
The na�onal LSSIP documents not only provide a unified view of the plans and progress of implementa�on at both Na�onal and ECAC levels. They also form the core of the ICAO’s Avia�on System Block Upgrades (ASBUs) Implementa�on Monitoring Report within the ICAO EUR Region. Developed by EUROCONTROL on behalf of ICAO, it is based on the reported LSSIP data for all 55 ICAO/EUR States and informs at global level about the European progress of implementa�on of the Global Air Naviga�on Plan (GANP).
Moreover, star�ng this year, the EUR RASP ques�onnaire, a joint effort between the ICAO EUR Office and EASA, directly supported by EUROCONTROL, has been officially incorporated into the LSSIP mechanism, thereby enhancing the collabora�on between our organisa�ons.
I would like to thank all our stakeholders for their con�nued commitment and significant effort in contribu�ng to the LSSIP process, the produc�on of this LSSIP document and in suppor�ng EUROCONTROL towards our goal of diligently guiding and informing the Avia�on community on ATM deployment.
Enjoy reading! Iacopo Prissinotti Director NM - Network Manager EUROCONTROL
LSSIP Year 2023 Estonia Working Level Agreed
SESAR Deployment Manager Lookout
This document serves as a testament to our collec�ve efforts in advancing the European ATM Network, and a roadmap for the challenges that lie ahead. We can truly state that this is the result of ac�ng as one team for the modernisa�on of European avia�on.
The SESAR Deployment Programme progress informa�on, collected through the LSSIP+ tool, via the unified monitoring and repor�ng process is a cornerstone of this document and at the same �me directly supports the delivery of the SESAR Deployment Programme Monitoring View 2023.
This drives the re-direc�on of our work at SDM to guide and support the opera�onal stakeholders in their implementa�on efforts of CP1 to make sure the ATM industry is able to achieve the target goals. It gives SDM, since the first edi�on of the Monitoring View in 2015, the opportunity to iden�fy implementa�on risks and beter support stakeholders to accelerate deployment.
I would like to extend my gra�tude to all European organisa�ons involved and contribu�ng with data in LSSIP+ tool. As it is only through stakeholders' coopera�on, efforts and partnerships' spirit that we will keep pushing deployment forward within the European skies, avoiding delays in the adop�on of CP1 and building an ATM industry that can overcome the challenges of the upcoming years.
The two CP1 regulatory target deadlines already surpassed, and the approaching ones, underscore the urgency of our mission to beter support stakeholders to accelerate deployment. The significant progress achieved in the status of its implementa�on is living proof for the joint effort of ATM stakeholders throughout Europe.
Those deadlines serve as a reminder that our work is not just about mee�ng regulatory requirements, but about shaping the future of avia�on in Europe. Every objec�ve we complete, every milestone we achieve, brings us one step closer to that future.
As you dive into this document and SDP Monitoring View 2023, we hope it provides you with a clear understanding of our common journey so far and the path that lies ahead. We look forward to naviga�ng these challenges together, driven by our shared commitment to a safer, more efficient, and sustainable European sky. Mariagrazia La Piscopia Chief Strategy and Programme SESAR Deployment Manager
LSSIP Year 2023 Estonia Working Level Agreed
Document Title LSSIP Year 2023 for Estonia
Info Centre Reference <XX> (LSSIP Support)
Date of Edi�on <Date>
LSSIP Focal Point Moonika Käst – moonika.kast@transpordiamet.ee Estonian Transport Administra�on
LSSIP Contact Person Luca Dell’Orto – luca.dellorto@eurocontrol.int EUROCONTROL/NMD/INF/PAS
LSSIP Support Team lssip.support@eurocontrol.int
Status Ini�al Dra�
Intended for EUROCONTROL Stakeholders
Available in htps://www.eurocontrol.int/service/local-single-sky-implementa�on- monitoring
Reference Documents
LSSIP Documents htps://www.eurocontrol.int/service/local-single-sky-implementa�on- monitoring
Master Plan Level 3 – Plan Edi�on 2023
htps://www.eurocontrol.int/publica�on/european-atm-master-plan- implementa�on-plan-level-3
Master Plan Level 3 – Report Year 2023
htps://www.eurocontrol.int/publica�on/european-atm-master-plan- implementa�on-report-level-3
European ATM Portal htps://www.atmmasterplan.eu/
STATFOR Forecasts htps://www.eurocontrol.int/sta�or
Na�onal AIP https://aim.eans.ee
LSSIP Year 2023 Estonia Working Level Agreed
Approval Sheet
The following authorities have approved all parts of the LSSIP Year 2023 document, and the signatures confirm the correctness of the reported information and reflect the commitment to implement the actions laid down in the European ATM Master Plan Level 3 (Implementation View) – Edition 2023.
Stakeholder / Organisation
Name Position Signature and date
Estonian Transport Administration
Üllar Salumäe Director of Aviation Division
Estonian Air Naviga�on Services
Ivar Värk Chairman of Management Board and CEO
Estonian Air Force Toomas Susi
Active Commander of the Estonian Air Force Brigadier General
AS Tallinna Lennujaam Riivo Tuvike Chairman of Management Board
Estonian Environment Agency
Taimar Ala Director General
Üllar Salumäe (Apr 11, 2024 10:53 GMT+3) Üllar Salumäe
Ivar Värk, CEO EANS (Apr 11, 2024 13:08 GMT+3)
Toomas Susi (Apr 11, 2024 14:29 GMT+3) Toomas Susi
Riivo Tuvike (Apr 15, 2024 16:31 GMT+3) Riivo Tuvike
Taimar Ala (Apr 15, 2024 16:44 GMT+3) Taimar Ala
LSSIP Year 2023 Estonia Working Level Agreed
Table of Contents
EXECUTIVE SUMMARY ........................................................................................................................................ 1
HIGH LEVEL STATS DASHBOARD ........................................................................................................................................ 1 TRAFFIC AND CAPACITY ................................................................................................................................................... 2 IMPLEMENTATION SUMMARY ........................................................................................................................................... 3
Summary of the implementation of the objectives ............................................................................................... 3 Other 2023 developments: .................................................................................................................................... 3
INTRODUCTION .................................................................................................................................................. 4
1 NATIONAL IMPLEMENTATION VIEW ............................................................................................................. 5
1.1 NATIONAL ATM SCOPE ...................................................................................................................................... 5 International Membership .................................................................................................................................... 5 Estonia is part of: .................................................................................................................................................. 5 Main National Stakeholders .................................................................................................................................. 6
1.2 IMPLEMENTATION VIEWS .................................................................................................................................... 7 Progress per SESAR Phase ..................................................................................................................................... 7 Progress per SESAR Essential Operational Changes and Phase............................................................................. 8 Objective Progress per SESAR Essential Operational Changes .............................................................................. 9 ICAO ASBU Implementation Progress – Blocks 0 and 1 ....................................................................................... 13 ICAO ASBU Implementation Progress .................................................................................................................. 14 Overall situation of Implementation Objectives .................................................................................................. 18
TRAFFIC AND CAPACITY .................................................................................................................................... 24
1.3 NATIONAL ATM STRUCTURE ............................................................................................................................. 24 Geographical description of the FIR(s) ................................................................................................................ 24 Airspace Classification and Organisation ............................................................................................................ 25
EVOLUTION OF TRAFFIC IN ESTONIA ................................................................................................................................ 26 TALLINN ACC.............................................................................................................................................................. 27
Traffic and en-route ATFM delays 2019-2029 ..................................................................................................... 27 2023 performance ............................................................................................................................................... 27 Planning Period – Summer 2024-2029 ................................................................................................................ 28
2 NATIONAL ATM ENVIRONMENT ................................................................................................................ 30
MAIN NATIONAL STAKEHOLDERS .................................................................................................................................... 30 Civil Regulator(s) ................................................................................................................................................. 30 Airports ................................................................................................................................................................ 33 Meteorological Service Providers ........................................................................................................................ 34 Military Authorities ............................................................................................................................................. 34
3 IMPLEMENTATION PROJECTS ..................................................................................................................... 38
3.1 NATIONAL PROJECTS ......................................................................................................................................... 38 3.2 FAB PROJECTS ................................................................................................................................................. 39 3.3 MULTINATIONAL PROJECTS ................................................................................................................................ 39
4 COOPERATION ACTIVITIES ......................................................................................................................... 40
4.1 FAB COORDINATION ........................................................................................................................................ 40 4.2 MULTINATIONAL COOPERATION INITIATIVES ......................................................................................................... 40
LSSIP Year 2023 Estonia Working Level Agreed
5 DETAILED OBJECTIVES IMPLEMENTATION PROGRESS ................................................................................. 42
Main Objectives ................................................................................................................................................... 42 Additional Objectives for ICAO ASBU Monitoring ............................................................................................... 64 Local Objectives ................................................................................................................................................... 66
ANNEX A: SPECIALISTS INVOLVED IN THE ATM IMPLEMENTATION REPORTING FOR ESTONIA ............................. 72
ANNEX B: QUESTIONNAIRES ............................................................................................................................. 73
1. SURVEILLANCE (SUR) QUESTIONNAIRE ..................................................................................................................... 73 2. EAPAIRR AND GAPPRE QUESTIONNAIRE ................................................................................................................. 74 3. SESAR SOLUTIONS IMPLEMENTED IN A VOLUNTARY WAY .............................................................................................. 75
ANNEX C: IMPLEMENTATION OBJECTIVES’ LINKS WITH OTHER PLANS ............................................................... 76
ANNEX D: NATIONAL STAKEHOLDERS ORGANISATION CHARTS ............................................................................. 86
ANNEX E: GLOSSARY OF TERMS ........................................................................................................................ 91
LSSIP Year 2023 Estonia 1 Working Level Agreed
Execu�ve Summary
High Level Stats dashboard
LSSIP Year 2023 Estonia 2 Working Level Agreed
Traffic and Capacity
Level of traffic compared to 2019.
Summer En-Route Delay Tallinn ACC
Forecast between 2024-2029
2022 2023 N/A
65%
2.7% 2024-2029
LSSIP Year 2023 Estonia 3 Working Level Agreed
Implementation Summary
Summary of the implementa�on of the objec�ves
The introduc�on of a new Voice Communica�on System was a major project, which was finalised by the first half of 2023 and contributed to the comple�on of Objec�ves COM11.1 and COM11.2.
The Objec�ve FCM04.2 Enhanced Short Term ATFCM Measures was fully completed.
All the SWIM related Objec�ves are planned or ongoing, but there are foreseen delays in implementa�on due to complex ATM systems. Nevertheless, in 2023 several AIS ac�vi�es were carried out, which contribute to the implementa�on of digital NOTAM Service. EANS is also par�cipa�ng in project ACADIA (Accelera�on of Aeronau�cal Digital Informa�on Availability) to ensure accordance.
ITY-ACID Aircra� Iden�fica�on is s�ll ongoing with an implementa�on date later than the FOC date due to a delay of neighbouring ANSP-s implementa�on plans.
The local Objec�ve AOP14.1 Remote Tower Services first stage was fully implemented and is envisaged to be completed for the next aerodrome (EEKE) by 2024.
Other 2023 developments:
- Installation of new meteorological systems at EEKA, EEKE, EETN and EETU AD is finished. Certification process is ongoing.
- Implementation of CAT II at Tallinn Airport is ongoing. - Changes in governmental system. Estonian Transport Administration and Environment
Agency moved into area of Ministry of Climate.
Implemen�ng progress of AOM13.1, INF07 has gone very slowly due to constant lack of human resources in Estonian Transport Administra�on.
LSSIP Year 2023 Estonia 4 Working Level Agreed
Introduc�on
The Local Single Sky ImPlementa�on (LSSIP) documents, as an integral part of the Master Plan (MP) Level 3 (L3)/LSSIP mechanism, cons�tute a short/medium term implementa�on plan containing ECAC+ States’ ac�ons to achieve the Implementa�on Objec�ves as set out by the MP Level 3 and to improve the performance of their na�onal ATM System. This LSSIP document describes the situa�on in the State at the end of December 2023, together with plans for the next years.
Chapter 1 provides an overview of the na�onal ATM scope within the State, which is relevant for the implementa�on ac�vi�es, as well as an overview of the planning ac�vi�es by providing different charts on the progress reported by the different stakeholders.
Chapter 2 provides a comprehensive picture of the situa�on of Air Traffic, Capacity and ATFM Delay per each ACC in the State. It shows the evolu�on of Air Traffic and Delay in the last five years and the forecast for the next five years. It also presents the achieved performance in terms of delay during the summer season period and the planned projects assumed to offer the required capacity which will match the foreseen traffic increase and keep the delay at the agreed performance level.
Chapter 3 provides an overview of the ATM ins�tu�onal arrangements within the State. Chapter 4 provides the main Implementa�on Projects which contribute directly to the implementa�on of the MP Opera�onal Improvements and/or Enablers and Implementa�on Objec�ves. The LSSIP document covers a high-level list of the projects showing the applicable links. All other details like descrip�on, �mescale, progress made and expected contribu�on to the ATM Key Performance Areas provided by the State per each project are available in the LSSIP DB (extrac�on can be asked to LSSIP FP or LSSIP CP).
Chapter 5 deals with other coopera�on ac�vi�es beyond Implementa�on Projects. It provides an overview of the FAB coopera�on, as well as all other mul�na�onal ini�a�ves, which are out of the FAB scope. The content of this chapter generally is developed and agreed in close coopera�on between the States concerned.
Chapter 6 provides the high-level informa�on on progress and plans of each Implementa�on Objec�ve. The informa�on for each Implementa�on Objec�ve is presented in boxes giving a summary of the progress and plans of implementa�on for each Stakeholder. The conven�ons used are presented at the beginning of the sec�on.
The information contained in Chapter 6 – Implementation Objectives Progress is deemed sufficient to satisfy State reporting requirements towards ICAO in relation to ASBU (Aviation System Block Upgrades) monitoring.
LSSIP Year 2023 Estonia 5 Working Level Agreed
1 Na�onal Implementa�on View
1.1 Na�onal ATM Scope
Interna�onal Membership
Estonia is a member of the following interna�onal organisa�ons in the field of ATM:
Organisa�on Since Organisa�on Since
2015
2004
1995
2004
1992
2004
2004
1992
1992
Estonia is part of: The North European Func�onal Airspace Block (NEFAB).
In 2023 the GDP decreased by 3,5%, the forecast for 2024 is about 0,4% of deficiency. Main airport covered by LSSIP: EETN AD.
Number of national projects: 4 Number of FAB projects: NIL Number of multinational projects: 3
LSSIP Year 2023 Estonia 6 Working Level Agreed
Main Na�onal Stakeholders
The main National Stakeholders involved in ATM in Estonia are the following:
- Ministry of Climate;
- Ministry of Economic Affairs and Communica�ons;
- Ministry of Defence;
- Estonian Transport Administration;
- Estonian Air Navigation Services (EANS);
- Estonian Environment Agency;
- Estonian Defence Forces Air Force;
- AS Tallinna Lennujaam.
Their activities are detailed in the following subchapters and their relationships are shown in the diagram below.
LSSIP Year 2023 Estonia 7 Working Level Agreed
1.2 Implementa�on Views
Progress per SESAR Phase
The figure below shows the progress made so far in the implementation of objectives stemming from different R&D phases (Pre-SESAR, SESAR1 and SESAR 2020).
It shows the average implementation progress for all objectives grouped by SESAR Phase, excluding those for which the State is outside the applicability area as defined on a yearly basis in the European ATM Master Plan (Level 3) 2023, i.e., disregarding the declared “NOT APPLICABLE” LSSIP progress status.
Source: EUROCONTROL LSSIP+ DB
LSSIP Year 2023 Estonia 8 Working Level Agreed
Progress per SESAR Essen�al Opera�onal Changes and Phase
The figure below shows the progress made so far, per SESAR Essential Operational Changes, in the implementation of the SESAR phases. The percentages are calculated as an average, per EOC, of the same objectives as in the previous paragraph.
Source: EUROCONTROL LSSIP+ DB
LSSIP Year 2023 Estonia 9 Working Level Agreed
Objec�ve Progress per SESAR Essen�al Opera�onal Changes
LSSIP Year 2023 Estonia 10 Working Level Agreed
No implementa�on objec�ves are available yet for this EOC.
LSSIP Year 2023 Estonia 11 Working Level Agreed
LSSIP Year 2023 Estonia 12 Working Level Agreed
No implementa�on objec�ves are available yet for this EOC. Source: EUROCONTROL LSSIP+ DB
LSSIP Year 2023 Estonia 13 Working Level Agreed
ICAO ASBU Implementa�on Progress – Blocks 0 and 1
The figure below shows the progress made so far in the implementation of the ICAO ASBU Blocks 0 and 1, according to ICAO Global Air Navigation Plan 7th Edition (2022). The overall percentage is calculated as an average of the relevant Objectives contributing to each of the relevant ASBU Blocks; this is a summary of the table explained on the next page – ICAO ASBU Implementation Progress.
Source: EUROCONTROL LSSIP+ DB
LSSIP Year 2023 Estonia 14 Working Level Agreed
ICAO ASBU Implementa�on Progress
The tables below show for each ASBU Elements belonging to a particular ASBU Thread and Block, the overall status, the final date foreseen for completion and the percentage of progress achieved in the current cycle.
The set of Block 0 and Block 1 ASBU elements to be monitored in ICAO EUR Region has been approved through written consultation by European Aviation System Planning Group (EASPG) in April 2021, based on the conclusions of the EUR Global Air Navigation Plan (GANP) Transition Project Team. The set of monitored Elements has been subsequently amended following the publication of the 7th version of the GANP, endorsed in October 2022.
Results below were determined using the LSSIP Year 2023 declared statuses and progress of the relevant Implementation objectives in accordance with the updated mapping.
Note: Only the ASBU elements that are linked to an active implementation Objective are shown
Source: EUROCONTROL LSSIP+ DB
LSSIP Year 2023 Estonia 15 Working Level Agreed
ATM Deployment Outlook
State Objec�ves
Deployed in 2023
- Interac�ve Rolling NOP
[FCM10] 100 % progress
- Improve Runway Safety by Preven�ng Runway Excursions
[SAF11.1] 100 % progress
- Collabora�ve Flight Planning
[FCM03] 100 % progress
- Voice over Internet Protocol (VoIP) in En-Route
[COM11.1] 100 % progress
- Voice over Internet Protocol (VoIP) in Airport/Terminal
[COM11.2] 100 % progress
- Enhanced Short Term ATFCM Measures
[FCM04.2] 100 % progress
- Automated Support for Traffic Complexity Assessment and Flight Planning interfaces
[FCM06.1] 100 % progress
By 2024
- Aeronau�cal Informa�on Exchange - Airspace Reserva�on (ARES)
[INF10.5] 3 % progress
- Harmonise Opera�onal Air Traffic (OAT) and General Air Traffic (GAT) Handling
[AOM13.1] 56 % progress
- Aircra� Iden�fica�on
[ITY-ACID] 92 % progress
Source: EUROCONTROL LSSIP+ DB
LSSIP Year 2023 Estonia 16 Working Level Agreed
By 2025
- Aeronau�cal Informa�on Exchange - Aerodrome mapping service
[INF10.7] 0 % progress
- Aeronau�cal Informa�on Exchange - Aeronau�cal Informa�on Features service
[INF10.8] 8 % progress
- Meteorological Informa�on Exchange - Aerodrome Meteorological informa�on Service
[INF10.10] 47 % progress
- Electronic Terrain and Obstacle Data (eTOD)
[INF07] 6 % progress
- Stakeholders’ SWIM PKI and cyber security
[INF10.2] 13 % progress
- Meteorological Informa�on Exchange - Network Meteorological Informa�on
[INF10.12] 0 % progress
- Aeronau�cal Informa�on Exchange – Digital NOTAM service
[INF10.6] 64 % progress
- Meteorological Informa�on Exchange - Volcanic Ash Mass Concentra�on informa�on service
[INF10.9] 3 % progress
- Meteorological Informa�on Exchange - En-Route and Approach Meteorological informa�on service
[INF10.11] 5 % progress
Source: EUROCONTROL LSSIP+ DB
By 2027+
- Flight Informa�on Exchange (Yellow Profile) - Data Publica�on Service
[INF10.21] 0 % progress
- Flight Informa�on Exchange (Yellow Profile) - No�fica�on Service
[INF10.20] 0 % progress
- Implement measures to reduce the risk to aircra� opera�ons caused by airspace infringements
[SAF10.1] 30 % progress
- Flight Informa�on Exchange (Yellow Profile) - Flight Data Request Service
[INF10.19] 0 % progress
Source: EUROCONTROL LSSIP+ DB
Airport Objec�ves Tallinn Airport
Deployed in 2023
- Con�nuous Descent Opera�ons (CDO)
[ENV01] 100 % progress
LSSIP Year 2023 Estonia 17 Working Level Agreed
By 2024
- Remote Tower Services
[AOP14.1] 40 % progress
- RNAV 1 in TMA Opera�ons
[NAV03.1] 97 % progress
Source: EUROCONTROL LSSIP+ DB
By 2027+
- Airport Collabora�ve Decision Making (A-CDM)
[AOP05] 1 % progress
Source: EUROCONTROL LSSIP+ DB
LSSIP Year 2023 Estonia 18 Working Level Agreed
Overall situa�on of Implementa�on Objec�ves
Main Objec�ves Topic Progress at the end of
2023 Status 2023 2024 2025 2026 2027 2028
2029 >2029
AOM13.1 Harmonise Opera�onal Air Traffic (OAT) and General Air Traffic (GAT) Handling
56% Ongoing
AOM19.4 Management of Predefined Airspace Configura�ons
100% Completed
AOM19.5 ASM and A-FUA 100% Completed AOM21.1 Direct Rou�ng 0% Not Applicable AOM21.2 Ini�al Free Route Airspace 100% Completed AOM21.3 Enhanced Free Route Airspace Opera�ons 100% Completed *
AOP04.1(EETN) Advanced Surface Movement Guidance and Control System A-SMGCS Surveillance
Service (former ICAO Level 1)
100% Completed
AOP04.2(EETN) Advanced Surface Movement Guidance and Control System (A-SMGCS) Runway Monitoring and Conflict Aler�ng (RMCA) (Airport Safety Support Service = former
ICAO Level 2)
100% Completed *
AOP05(EETN) Airport Collabora�ve Decision Making (A- CDM)
1% Ongoing
AOP10(EETN) Time-Based Separa�on 0% Not Applicable * AOP11.1(EETN) Ini�al Airport Opera�ons Plan 0% Not Applicable * AOP11.2(EETN) Extended Airport Opera�ons Plan 0% Not Applicable * AOP12.1(EETN) Airport Safety Nets 0% Not Applicable * AOP13(EETN) Automated Assistance to Controller for
Surface Movement Planning and Rou�ng 0% Not Applicable *
AOP14.1(EETN) Remote Tower Services 40% Ongoing 2030 AOP15 Enhanced traffic situa�onal awareness
and airport safety nets for the vehicle drivers
0% Not Applicable 2030
AOP16 Guidance assistance through airfield ground ligh�ng
0% Not Applicable 2030
LSSIP Year 2023 Estonia 19 Working Level Agreed
Main Objec�ves Topic Progress at the end of
2023 Status 2023 2024 2025 2026 2027 2028
2029 >2029
AOP17 Provision/integra�on of departure planning informa�on to NMOC
0% Not Applicable 2030
AOP18 Runway Status Lights (RWSL) 0% Not Applicable 2030 AOP19(EETN) Departure Management Synchronised
with Pre-departure sequencing 0% Not Applicable
AOP21 Wake Turbulence Separa�ons for Arrivals based on Sta�c Aircra� Characteris�cs (S-
PWS-A)
0% Not Applicable 2030
AOP23(EETN) Integrated runway sequence for full traffic op�miza�on on single and mul�ple
runway airports
0% Not yet planned 2030
AOP25(EETN) De-icing management tool 0% Not yet planned 2030 AOP26 Reduced separa�on based on local
Runway Occupancy Time (ROT) characterisa�on
0% Not Applicable 2030
ATC02.2 Implement ground based safety nets - Short Term Conflict Alert (STCA) - level 2
for en-route opera�ons
100% Completed
ATC02.8 Ground-Based Safety Nets 100% Completed ATC02.9 Short Term Conflict Alert (STCA) for TMAs 100% Completed
ATC07.1(EETN) AMAN Tools and Procedures 0% Not Applicable ATC12.1 Automated Support for Conflict Detec�on,
Resolu�on Support Informa�on and Conformance Monitoring
100% Completed
ATC15.1 Informa�on Exchange with En-route in Support of AMAN
100% Completed
ATC15.2(EETN) Arrival Management Extended to En-route Airspace
0% Not Applicable *
ATC16 Implement ACAS II compliant with TCAS II change 7.1
100% Completed
ATC18 Mul�-Sector Planning En-route - 1P2T 0% Not Applicable 2030 ATC19(EETN) AMAN/DMAN Integra�on 0% Not Applicable *
LSSIP Year 2023 Estonia 20 Working Level Agreed
Main Objec�ves Topic Progress at the end of
2023 Status 2023 2024 2025 2026 2027 2028
2029 >2029
ATC20 Enhanced STCA with down-linked parameters via Mode S EHS
0% Not Applicable 2030
ATC23 Ini�al Air-Ground Trajectory Informa�on Sharing (Ground Domain)
0% Not yet planned *
ATC25 Ini�al Trajectory Informa�on Sharing ground distribu�on
0% Not yet planned *
ATC26(EETN) Point Merge in complex TMA 0% Not Applicable 2030 COM10.1 Migrate from AFTN to AMHS (Basic
service) 100% Completed
COM10.2 Extended AMHS 100% Completed * COM11.1 Voice over Internet Protocol (VoIP) in En-
Route 100% Completed
COM11.2 Voice over Internet Protocol (VoIP) in Airport/Terminal
100% Completed *
COM12 New Pan-European Network Service (NewPENS)
100% Completed *
COM13 Air Traffic Services (ATS) datalink using SatCom Class B
0% Not yet planned 2030
ENV01(EETN) Con�nuous Descent Opera�ons (CDO) 100% Completed * ENV02(EETN) Airport Collabora�ve Environmental
Management 100% Completed 2030
ENV03(EETN) Con�nuous Climb Opera�ons (CCO) 0% Not Applicable 2030 FCM01 Implement enhanced tac�cal flow
management services 100% Completed
FCM03 Collabora�ve Flight Planning 100% Completed FCM04.2 Enhanced Short Term ATFCM Measures 100% Completed FCM06.1 Automated Support for Traffic Complexity
Assessment and Flight Planning interfaces 100% Completed
FCM10 Interac�ve Rolling NOP 100% Completed * FCM11.1(EETN) Ini�al AOP/NOP Informa�on Sharing 0% Not Applicable * FCM11.2(EETN) AOP/NOP integra�on 0% Not Applicable *
INF07 Electronic Terrain and Obstacle Data 6% Ongoing
LSSIP Year 2023 Estonia 21 Working Level Agreed
Main Objec�ves Topic Progress at the end of
2023 Status 2023 2024 2025 2026 2027 2028
2029 >2029
(eTOD) INF10.10 Meteorological Informa�on Exchange -
Aerodrome Meteorological informa�on Service
47% Ongoing *
INF10.11 Meteorological Informa�on Exchange - En-Route and Approach Meteorological
informa�on service
5% Ongoing *
INF10.12 Meteorological Informa�on Exchange - Network Meteorological Informa�on
0% Planned *
INF10.13 Coopera�ve Network Informa�on Exchange - ATFCM Tac�cal Updates
Service (Airport Capacity and Enroute)
0% Not Applicable *
INF10.14 Coopera�ve Network Informa�on Exchange – Flight Management Service
(Slots and NOP/AOP integra�on)
0% Not Applicable *
INF10.15 Coopera�ve Network Informa�on Exchange – Measures Service (Traffic
Regula�on)
0% Not Applicable *
INF10.16 Coopera�ve Network Informa�on Exchange - Short Term ATFCM Measures
services (MCDM, eHelpdesk, STAM measures)
0% Not Applicable *
INF10.17 Coopera�ve Network Informa�on Exchange – Counts service (ATFCM
Conges�on Points)
0% Not Applicable *
INF10.19 Flight Informa�on Exchange (Yellow Profile) - Flight Data Request Service
0% Planned *
INF10.2 Stakeholders’ SWIM PKI and cyber security
13% Ongoing *
INF10.20 Flight Informa�on Exchange (Yellow Profile) - No�fica�on Service
0% Planned *
INF10.21 Flight Informa�on Exchange (Yellow Profile) - Data Publica�on Service
0% Planned *
LSSIP Year 2023 Estonia 22 Working Level Agreed
Main Objec�ves Topic Progress at the end of
2023 Status 2023 2024 2025 2026 2027 2028
2029 >2029
INF10.23 Flight Informa�on Exchange (Yellow Profile) - Extended AMAN SWIM Service
0% Not Applicable *
INF10.3 Aeronau�cal Informa�on Exchange - Airspace structure service
100% Completed *
INF10.4 Aeronau�cal Informa�on Exchange - Airspace Availability Service
100% Completed *
INF10.5 Aeronau�cal Informa�on Exchange - Airspace Reserva�on (ARES)
3% Ongoing *
INF10.6 Aeronau�cal Informa�on Exchange – Digital NOTAM service
64% Ongoing *
INF10.7 Aeronau�cal Informa�on Exchange - Aerodrome mapping service
0% Ongoing *
INF10.8 Aeronau�cal Informa�on Exchange - Aeronau�cal Informa�on Features service
8% Ongoing *
INF10.9 Meteorological Informa�on Exchange - Volcanic Ash Mass Concentra�on
informa�on service
3% Ongoing *
ITY-ACID Aircra� Iden�fica�on 92% Ongoing ITY-AGDL Ini�al ATC Air-Ground Data Link Services 100% Completed
ITY-AGVCS2 8,33 kHz Air-Ground Voice Channel Spacing below FL195
100% Completed
ITY-COTR Implementa�on of ground-ground automated co-ordina�on processes
100% Completed
ITY-FMTP Common Flight Message Transfer Protocol (FMTP)
100% Completed
NAV03.1(EETN) RNAV 1 in TMA Opera�ons 97% Ongoing 2030 NAV03.2(EETN) RNP 1 in TMA Opera�ons 0% Not Applicable 2030 NAV10(EETN) RNP Approach Procedures to instrument
RWY 100% Completed *
NAV11.1 Implement precision approach procedures using GBAS CAT II based on GAST C
0% Not Applicable 2030
NAV12 ATS IFR Routes for Rotorcra� Opera�ons 0% Not Applicable 2030
LSSIP Year 2023 Estonia 23 Working Level Agreed
Main Objec�ves Topic Progress at the end of
2023 Status 2023 2024 2025 2026 2027 2028
2029 >2029
SAF10.1 Implement measures to reduce the risk to aircra� opera�ons caused by airspace
infringements
30% Ongoing 2030
SAF11.1 Improve Runway Safety by Preven�ng Runway Excursions
100% Completed 2030
LEGEND:
* Full Operational Capability (FOC) date The Planned Implementation Date as reported in the LSSIP DB for each objective
LSSIP Year 2023 Estonia 24 Working Level Agreed
Traffic and Capacity
1.3 Na�onal ATM Structure
Geographical description of the FIR(s)
The geographical scope of this document addresses the Estonia ‘Tallinn Flight Information Region’ FIR:
Tallinn FIR is surrounded by FIRs of 4 States, namely Helsinki FIR and Helsinki TMA in the north, St. Petersburg FIR in the east, Riga FIR/TMA in the south and Sweden FIR-s in the west.
St. Petersburg belongs to the Russian Federation, a non- ECAC State.
The Control Area (CTA) covers the geographical limits of the Tallinn FIR from FL 95 up to FL 660. Control Zones (CTR-s) are implemented around 2 airports, namely Tallinn and Ämari (Military). In addition, there are Kärdla, Kuressaare, Pärnu and Tartu FIZ.
LSSIP Year 2023 Estonia 25 Working Level Agreed
Airspace Classification and Organisation
FIR: SFC - UNL
CTA: FL 95 - FL 660
In accordance with national regulations, only the Imperial System is used in Estonia.
ATC Units
The ATC units in the Estonian airspace, which are of concern to this LSSIP, are the following:
ATC Unit Number of sectors Associated FIR(s) Remarks
En-route TMA
TALLINN ATCC 2+1 1 Tallinn
CTA (Class C)
+ 1 Feeder sector suite operational regularly as from Nov 2005
Tallinn APP 1 Tallinn TMA Collocated with Tallinn ACC
LSSIP Year 2023 Estonia 26 Working Level Agreed
Evolu�on of Traffic in Estonia
2023 Traffic in Estonia increased by 5% compared to 2022 and recovery was at 65% of 2019.
2024-2029
The EUROCONTROL Seven-Year forecast predicts an average annual increase between 0.9% and 4.5% during the planning cycle, with an average baseline growth of 2.7%.
0
50000
100000
150000
200000
250000
2019 A 2020 A 2021 A 2022 A 2023 F 2024 F 2025 F 2026 F 2027 F 2028 F 2029 F
IF R
fli gh
ts
Estonia - Annual IFR Movements
IFR movements - Actuals
IFR movements - Base
IFR movements - High
IFR movements - Low
2020 A 2021 A 2022 A 2023 F 2024 F 2025 F 2026 F 2027 F 2028 F 2029 F
High . . . 6.8% 10.0% 4.0% 3.7% 3.4% 3.3% 2.6% Base -58% 13% 30% 6.1% 8.3% 1.7% 1.9% 1.7% 1.6% 1.0% Low . . . 5.4% 6.2% -0.5% 0.3% 0.0% 0.1% -0.5% High . . . 10% 9.1% 3.6% 3.4% 2.9% 2.7% 2.1% Base -55% 25% 48% 10% 6.9% 1.7% 2.0% 1.7% 1.7% 1.0% Low . . . 8.8% 5.9% -0.1% 0.5% 0.3% 0.4% -0.3%
EUROCONTROL Forecast Update 2023-2029 - October 2023
IFR Movements (Growth)
Estonia
ECAC
LSSIP Year 2023 Estonia 27 Working Level Agreed
Tallinn ACC
Traffic and en-route ATFM delays 2019-2029
2023 performance
Tallinn ACC
Traffic En-route Delay (min. per flight)
Capacity
2023 vs.2022
% of 2019 All reasons
ACC Reference
Value
Capacity Gap?
Baseline
Year +5% 63% 0.00 0.03 No
Summer +9% 66% 0.00 51
Summer 2023 performance assessment
The average delay per flight was zero in Summer 2023.
Opera�onal ac�ons Achieved Comments Review and analysis of exis�ng FRA connec�ng routes (FINEST AREA) Ongoing Pending FINEST state-level agreement
FINEST: review and update of necessary procedures Ongoing Pending FINEST state-level agreement
Bal�c three-state CIV-MIL mee�ngs Ongoing All military exercises in Bal�c Sea region are properly coordinated
Possible modifica�ons according to KPIs and customer feedback Ongoing
Moderniza�on of Tallinn TMA and CTR Ongoing CTR modernisa�on planned for spring 2024, and TMA modernisa�on to be launched during spring 2024
Dynamic sectorisa�on in Tallinn FIR Ongoing Simula�ons are ongoing to find addi�onal configura�ons for summer 2024, based on 2023 airblocks
Harmonized ATC procedures between Finland and Estonia Ongoing Pending FINEST state-level agreement FINEST: review and update of necessary ATM procedures Ongoing Pending FINEST state-level agreement
VCS update 23 MAR 2023 Yes
Maximum configura�on: 3 EETT / 10 FINEST* Yes *Pending FINEST state-level agreement
2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Peak Day Traffic 777 553 468 470 503 Summer Traffic 669 207 318 408 445 Yearly Traffic 605 253 288 365 382 Summer Traffic Forecast - Baseline 473 482 488 495 501 507 Summer Traffic Forecast - High 480 495 508 522 535 546 Summer Traffic Forecast - Low 465 465 466 467 466 465 Summer enroute delay (all causes) 0.01 0.00 0.00 0.00 0.00 Yearly enroute delay (all causes) 0.00 0.00 0.00 0.00 0.00
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0
100
200
300
400
500
600
700
800
900
En ro
ut e
De la
y (m
in ut
es p
er fl
ig ht
)
IF R
fli gh
ts (D
ai ly
A ve
ra ge
) EETTACC - Traffic and en-route ATFM delays
LSSIP Year 2023 Estonia 28 Working Level Agreed
Planning Period – Summer 2024-2029 The planning focuses on the summer season to reflect the most demanding period of the year from a capacity perspective. This approach ensures consistency with the previous planning cycles. The measures for each year are the measures that will be implemented before the summer season.
Summer Capacity Plan
2024 2025 2026 2027 2028 2029
Free Route Airspace Follow up of and possible modifica�ons to support ATFCM
Airspace Management Advanced FUA
FINEST: review and update of necessary procedures
Bal�c three-state CIV-MIL mee�ngs
Airport & TMA Network Integra�on Possible modifica�ons according to KPIs and customer feedback
Moderniza�on of Tallinn CTR
Moderniza�on of Tallinn TMA
Coopera�ve Traffic Management FINEST review and update as necessary
Common FMP for Estonia and Finland
Airspace
Dynamic Cross-border sectorisa�on Estonia/Finland
Dynamic sectorisa�on in
Tallinn FIR
FINEST: review and update of airspace as necessary a�er the FINEST implementa�on
Procedures Harmonized ATC procedures between Finland and Estonia
FINEST: review and update of necessary ATM procedures
Staffing ATCO cross border opera�ons between Finland and Estonia
Technical
ATM system upgrade and
interface with LARA (spring 2024)
Capacity
One configura�on for FINEST managed by common FMP
FINEST capacity based on CAPAN. Pending FINEST
cross-border service with 1FDP
FINEST capacity annual review. Pending FINEST cross-border service with 1FDP
Significant Events
Max sectors 4 EETT 4 EETT 10 FINEST*
4 EETT 10 FINEST*
4 EETT 10 FINEST*
4 EETT 10 FINEST*
4 EETT 10 FINEST*
Planned Annual Capacity Increase 3% 3% 3% 3% 3% 3%
Capacity Profile - Base Annual % Increase 0%
Capacity Plan v. Profile - Base 4%
Annual Reference Value (min) 0.02
Addi�onal informa�on * Pending FINEST cross-border service with 1FDP
LSSIP Year 2023 Estonia 29 Working Level Agreed
0
1
2
3
4
00 :0
0 01
:0 0
02 :0
0 03
:0 0
04 :0
0 05
:0 0
06 :0
0 07
:0 0
08 :0
0 09
:0 0
10 :0
0 11
:0 0
12 :0
0 13
:0 0
14 :0
0 15
:0 0
16 :0
0 17
:0 0
18 :0
0 19
:0 0
20 :0
0 21
:0 0
22 :0
0 23
:0 0
EETTCTA - May-October 2024
Nb sectors (std) Nb sectors (max)
2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2024-2029 Plan 53 55 57 59 61 63 2024-2029 Capacity Profile BASE 51 Capacity Baseline 67 36 40 51 51
0
10
20
30
40
50
60
70
80
Ca pa
ci ty
p ro
fil e
(m ov
em en
ts p
er h
ou r)
EETTCTA - Reference capacity profile
2024-2029 Outlook
No capacity issues are foreseen for Tallinn ACC for the period 2024-2029.
LSSIP Year 2023 Estonia 30 Working Level Agreed
2 Na�onal ATM Environment
Main Na�onal Stakeholders
Civil Regulator(s)
General Information Civil Aviation in Estonia is the responsibility of the Ministry of Climate. The different national entities having regulatory responsibilities in ATM are summarised in the table below. The Estonian Transport Administration is further detailed in the following sections.
Activity in ATM: Organisation responsible Legal Basis
Rulemaking Ministry of Climate Rulemaking: Ministry of Climate.
Statutes of Ministry of Climate
(Regulation of Government of the Republic of Estonia No 71 of 29. June 2023)
Safety Oversight The Estonian Transport Administration (Estonian NSA)
(From 01.01.2021)
Safety Oversight: Estonian Transport Administration
Aviation Act
Statutes of Estonian Transport Administration
(Regulation of the Minister of Economic Affairs and Infrastructure No 82 of 03. December 2020)
Enforcement actions in case of non-compliance with safety regulatory requirements
Estonian NSA Aviation Act
Statutes of Estonian Transport Administration
(Regulation of the Minister of Economic Affairs and Infrastructure No 82 of 03. December 2020)
Airspace Estonian NSA Aviation Act
Statutes of Estonian Transport Administration
(Regulation of the Minister of Economic Affairs and Infrastructure No 82 of 03. December 2020)
Economic MoEA&C Statutes of Ministry of Climate
(Regulation of Government of the Republic of Estonia No 71 of 29. June 2023)
Environment Ministry of Environment Statutes of Climate
(Regulation of Government of the Republic of Estonia No 71 of 29. June 2023)
Security Estonian NSA Aviation Act
Statutes of Estonian Transport Administration
(Regulation of the Minister of Economic Affairs and Infrastructure No 82 of 03. December 2020)
Accident investigation Estonian Safety Investigation Bureau (ESIB)
Aviation Act
Statues of Ministry of Economic Affairs and
LSSIP Year 2023 Estonia 31 Working Level Agreed
Communica�on
(Regula�on of Government of the Republic of Estonia No 323 of 10. December 2002)
Estonian Transport Administration
The Estonian Transport Administration (Estonian NSA) is in the jurisdiction of the Ministry of Climate, and it is the Estonian Safety Supervisory Authority, responsible for exercising state supervision over the compliance with the requirements deriving from legal acts regulating the field of activity of Estonian NSA. It has enforcement powers, and it is the extra-judicial body, which conducts proceedings in matters of misdemeanours. Estonian NSA participates in the drafting of legal acts concerning its area of activities, makes proposals on the amendments of those legal acts, such as the improvement of Estonian-language aviation terminology, participates in the development of policies, strategies, development plans, prepares and implements projects in its area of activities, including international projects. The Estonian NSA is institutionally separated from the Estonian Service Providers.
Annual Report published: Y Annual Safety report of 2023 has been published here.
National Civil Aviation Master Plan (CAMP):
N National CAMP is referenced in ICAO resolutions below:
• A39-23: No Country Left Behind (NCLB) Initiative (Draws the attention of Contracting States requesting technical cooperation and technical assistance to the advantages to be derived from well-defined projects based on civil aviation master plans)
• A39-25: Aviation’s contribution towards the United Nations 2030 Agenda for Sustainable Development (Urges Member States to enhance their air transport systems by effectively implementing SARPs and policies while at the same time including and elevating the priority of the aviation sector into their national development plans supported by robust air transport sector strategic plans and civil aviation master plans, thereby leading to the attainment of the SDGs)
• A39-26: Resource Mobilization (Requests the Secretary General to develop guidance material to assist States in including and elevating the priority of the aviation sector into their national development plans and developing robust air transport sector strategic plans and civil aviation master plans).
The Estonian Transport Administration website is: https://transpordiamet.ee/en
The organization chart is available in Annex D.
LSSIP Year 2023 Estonia 32 Working Level Agreed
Estonian Air Navigation Services - EANS
Service provided
In accordance with international standards the controlled airspace is divided into 3 air traffic control units to fulfil different tasks: Tower Control Unit, Approach Control Unit and Area Control Centre. In addition to these services the ATS units also provide alerting service and flight information service.
The services of EANS are:
- Provision of Air Traffic Service;
- Publication, exchange and dissemination of Aeronautical Information - Aeronautical Information Services;
- Technology: ATM Systems, Navigation, Radio Communication, Surveillance;
- Consultancy Services and expertise in the field of aviation;
- Development activities.
EANS
Governance: MoEA&C Ownership: 100% State (MoEA&C)
Services provided Y/N Comment
ATC en-route Y
ATC approach Y
ATC Aerodrome(s) Y Tallinn CTR.
AIS Y
CNS Y
MET N Estonian Environment Agency
ATCO training Y EANS provides OJT and complementary training.
Others Remote TWR (rAFIS) service in Tallinn for Tartu AD. There is a plan to start provision of the AFIS also at other Estonian regional airports by using Remote TWR (rAFIS) concept.
Additional information: -
Provision of services in other State(s):
N
Annual Report published: Y This is the annual report covering yearly activities of the ANSP.
Further information is available on the EANS website: http://www.eans.ee/en
The organisation chart is available in Annex D.
LSSIP Year 2023 Estonia 33 Working Level Agreed
ATC systems in use
Main ANSP part of any technology alliance1 Y FINEST
FDPS
Specify the manufacturer of the ATC system currently in use: Thales
Upgrade2 of the ATC system is performed or planned? Software and hardware upgrade planned 2024
Replacement of the ATC system by the new one is planned? Not planned
ATC Unit ACC/APP
SDPS
Specify the manufacturer of the ATC system currently in use: Thales
Upgrade of the ATC system is performed or planned? Software and hardware upgrade planned 2024
Replacement of the ATC system by the new one is planned? Not planned
ATC Unit ACC/APP
Airports
General information The main airports of Estonia: Tallinn, Tartu, Kuressaare, Kärdla, Pärnu airports, and Kihnu, Ruhnu airfields are operated by AS Tallinna Lennujaam. It is a 100% State owned stock company under the supervision of the Ministry of Climate.
Airport(s) covered by the LSSIP Referring to the List of Airports in the European ATM Master Plan Level 3 Implementation Plan Edition 2023– Annex 2, it is up to the individual State to decide which additional airports will be reported through LSSIP for those Objectives. The airport that is covered in this LSSIP is Tallinn Airport (non CP1).
https://airport.ee/en/corporate/lennart-meri-tallinn-airport-estonias-aerial-gateway/
The EUROCONTROL Public Airport Corner also provides information for Tallinn Airport: https://ext.eurocontrol.int/airport_corner_public/
The organisation chart is available in Annex D.
1 Technology alliance is an alliance with another service provider for joint procurement of technology from a particular supplier (e.g., COOPANS alliance) 2 Upgrade is defined as any modification that changes the operational characteristics of the system (SES Framework Regulation 549/2004, Article 2 (40))
LSSIP Year 2023 Estonia 34 Working Level Agreed
Meteorological Service Providers
Estonian Environment Agency Estonian Environment Agency, which is responsible for all activities carried out by national civil meteorological and hydrological service. The Estonian Environment Agency is responsible for provision of meteorological service (forecasting and weather warning services) for international and domestic aviation within Tallinn Flight Information Region (FIR), except EEEI AD CTR (MIL). The Weather Forecasting Department is a part of the Estonian Environment Agency (ESTEA).
Estonian Environment Agency`s objective is contribution towards the safety, regularity and efficiency of international air navigation by supplying the operators, flight crew members, air traffic service units, search and rescue services units, airport managements and other customers concerned with the conduct or development of international air navigation with the meteorological information.
The contacts of the Estonian Environment Agency and the Weather Forecasting Department can be found at https://keskkonnaagentuur.ee/en.
Service provided
Estonian Environment Agency provides 24/7 forecasting and weather warning service to Kuressaare, Kärdla, Pärnu, Tallinn, Tartu aerodromes and within Tallinn FIR. Additionally, they provide weather observation service for Estonian Civil Airports.
The organisa�on chart is available in Annex D.
Military Authorities
The Military Authorities in Estonia concerned with ATM are:
- Ministry of Defence;
- Estonian Military Aviation Authority;
- Defence Forces Air Force Staff;
- Ämari Airbase.
They report to the Ministry of Defence.
Their regulatory, service provision and user role in ATM are detailed below.
Estonian Military Aviation Authority is responsible for setting, monitoring and enforcing safety standards through military aviation regulations.
Estonian Defence Forces Air Force Staff is responsible for the safety, monitoring of military aviation tasks and participation in decision making progress concerning airspace management.
Ämari Airbase is responsible for air navigation service at Ämari military airfield and within Ämari control zone.
Co-ordination between civil air navigation service providers and the military authorities is ensured through Letters of Agreements (LoAs).
Further information is available on the Estonian Defence Forces website: https://mil.ee/en.
The organisation chart is available in Annex D.
LSSIP Year 2023 Estonia 35 Working Level Agreed
Regulatory role
Regulatory framework and rulemaking
Oversight
OAT GAT
OAT and provision of service for OAT governed by national legal provisions?
Y Provision of service for GAT by the Military governed by national legal provisions?
Y
Level of such legal provision: Ministry of Defence Level of such legal provision: Ministry of Defence, Estonian NSA
Authority signing such legal provision: Minister of Defence Authority signing such legal provision: Ministry of Defence
These provisions cover: These provisions cover:
Rules of the Air for OAT Y
Organisation of military ATS for OAT Y Organisation of military ATS for GAT Y
OAT/GAT Co-ordination Y OAT/GAT Co-ordination Y
ATCO Training Y ATCO Training Y
ATCO Licensing Y ATCO Licensing Y
ANSP Certification NA ANSP Certification Y
ANSP Supervision NA ANSP Supervision Y
Aircrew Training Y ESARR applicability NA
Aircrew Licensing Y
Additional Information: - Additional Information: -
Means used to inform airspace users (other than military) about these provisions:
Means used to inform airspace users (other than military) about these provisions:
National AIP NA National AIP Y
National Military AIP NA National Military AIP NA
EUROCONTROL eAIP NA EUROCONTROL eAIP NA
Other: Y Other: -
OAT GAT
NSA (as per SES reg. 550/2004) for GAT services provided by the military is CAA.
NSA for OAT is MoD
NSA (as per SES reg. 550/2004) for GAT services provided by the military is Estonian Transport Administration.
Additional information: - Estonian Transport Administration is responsible for the certification for GAT.
LSSIP Year 2023 Estonia 36 Working Level Agreed
Service Provision role
Military ANSP providing GAT services SES certified?
Y If YES, since: 01.05.2017 Duration of the Certificate:
NIL
Certificate issued by: Estonian Transport Administration
If NO, is this fact reported to the EC in accordance with SES regulations?
NA
Additional Information: Military provides service to GAT in Ämari CTR.
User role
OAT GAT
Services Provided: Services Provided:
En-Route N En-Route Military fly GAT, the service is provided by EANS
En-Route N
Approach/TMA N EANS Approach/TMA N
Airfield/TWR/GND Y Airfield/TWR/GND Y
AIS Y AIS N
MET Y MET Y
SAR Y SAR Y
TSA/TRA monitoring Y FIS Y
Other: - Other: -
Additional Information: Additional Information:
IFR inside controlled airspace, Military aircraft can fly?
OAT only N GAT only N Both OAT and GAT Y
If Military fly OAT-IFR inside controlled airspace, specify the available options:
Free Routing Y Within specific corridors only N
Within the regular (GAT) national route network Y Under radar control Y
Within a special OAT route system N Under radar advisory service N
If Military fly GAT-IFR inside controlled airspace, specify existing special arrangements:
No special arrangements Y Exemption from Route Charges N
Exemption from flow and capacity (ATFCM) measures N Provision of ATC in UHF N
CNS exemptions: RVSM N 8.33 N Mode S N ACAS N
Others: Provision of ATC in UHF available only by Ämari TWR.
LSSIP Year 2023 Estonia 37 Working Level Agreed
Flexible Use of Airspace (FUA)
Military in Estonia applies FUA requirements as specified in the Regulation No 2150/2005: Y
FUA Level 1 implemented: Y
FUA Level 2 implemented: Y
FUA Level 3 implemented: Y
LSSIP Year 2023 Estonia 38 Working Level Agreed
3 Implementa�on Projects
The tables below present high-level information about the main projects currently ongoing in Estonia. The details of each project are available in the LSSIP DB.
3.1 Na�onal projects
Name of project: Organisation(s): Schedule: Progress Description: Links: Implementation of UTM software
EANS (EE), Estonian Transport Administration (EE), Frequentis AG
Coordination of unmanned flights in Tallinn CTR started in 2023, services at Tartu and other regional airports will be added in the following years. UTM services for authority users (emergency services, police etc) are planned for 2024-2025. Interfacing with national drone registry is planned for early 2025. Provision of CIS services is planned in the coming years, with the implementation of U-space.
Additional services are added to the UTM system in 2024 March, together with mobile applications for pilots. Project to provide UTM services in Tartu airport begins in II quarter of 2024 with implementation planned for late 2024. Preparations for getting data from national drone registry started in 2023 and will continue throughout 2024. Discussions and workshops to design UTM services for authority users started in early 2024.
-
Navigation Infrastructure Rationalisation
EANS (EE), Estonian Transport Administration (EE)
2024 IQ Implementation and activities are ongoing, project is planned to be implemented by the first quarter of 2024.
L3: NAV03.1
Tallinn Airport A-CDM implementation project
EANS (EE), TALLINN AIRPORT Ltd. (EE)
- Delayed. Due to Covid-19 economic crisis, resources are minimized.
L3: AOP05
LSSIP Year 2023 Estonia 39 Working Level Agreed
Name of project: Organisation(s): Schedule: Progress Description: Links: rTWR Implementation EANS (EE), Estonian
Transport Administration (EE), TALLINN AIRPORT Ltd. (EE)
Tartu is operational since April 2023 and Kuressaare aerodrome should be operational in IIQ 2024.
Two airports' (Kuressaare and Tartu) remote tower installations are ready, governing body Estonian Transportation Administration has issued aeronautical equipment certificate separately for both installations. Service validation activities for Kuressaare aerodrome's remote tower are starting in November 2023. Kuressaare remote tower is expected to be operational in IIQ 2024.
-
3.2 FAB projects
NIL
3.3 Mul�na�onal projects
Name of project: Organisation(s): Schedule: Progress Description: Links: Borealis FRA Implementation (Part 2) (2015_227_AF3_A; 2015_227_AF3_B)
AVINOR AS (NO), AirNav Ireland-ATS Provider (IE), EANS (EE), Fintraffic ANS (FI), LFV (SE), LGS (LV), NATS (UK), Naviair (DK)
2015 - 2024 Work in progress L3: AOM21.2
CONCERTO Solution 2 Borealis Alliance, DLR, EANS (EE), EUROCONTROL, IcelandAir, Thales
Planning in progress Project started 2023.
Implementation planned 2023-2026
-
EANS Support to ACADIA (2022_014_AF5)
EANS (EE), EUROCONTROL Project ongoing Implementation plan established and subtask 2 achieved.
L3: INF10.7, INF10.6, INF10.8
LSSIP Year 2023 Estonia 40 Working Level Agreed
4 Coopera�on Ac�vi�es
4.1 FAB Coordina�on
NEFAB
The main objectives of ANSPs cooperation in the framework of NEFAB are coordination of efforts, sharing of resources
and synergy.
This cooperation includes:
- Coordinated cooperation with States to support NEFAB Committees and Council;
- Analysis and monitoring of SES requirements, coordinating with EU initiatives;
- Common representation of the NEFAB ANSPs at the NMB;
- Cooperation and information sharing between NEFAB ANSPs on CANSO and NM working groups activities;
- Coordinated contribution to NDOP, NDTECH and development of network services.
4.2 Mul�na�onal Coopera�on Ini�a�ves
Borealis FRA
The Borealis Alliance is the industrial partnership between 9 European ANSPs - LFV (Sweden), ANS Finland (Finland), Avinor (Norway), Isavia ANS (Iceland), Naviair (Denmark), EANS (Estonia), IAA (Ireland), LGS (Latvia) and NATS (UK). The objective of the Alliance is to enable joint initiatives to improve flight efficiency and reduce environmental impact, delivered across the whole area in a move which will also streamline cost of services and operational/technical infrastructure.
Alliance continues to work on Free Route Airspace (FRA) Programme execution to create a multi-FAB FRA by establishing interfaces between FRA areas in 3 FABs and Iceland. FRA implementation is still on-going in UK and is expected to complete in 2028.
Meanwhile, the IAA expanded Free Route Airspace (FRA) in 2017 to include Low Level airspace from FL075. In 2019 the Borealis Alliance commenced cross-border FRA between the Maastricht UAC area of responsibility, the DK/SE FAB and the northern part of Germany; and remains open to considering other cross-border proposals should they arise.
Successful FRA implementation in NEFRA airspace enabled the removal of ATS routes in Estonia and Finland. Some other States also consider removal of ATS routes.
FINEST
FINEST is a bilateral coopera�on programme between Estonia EANS and Fintraffic ANS intended to respond to the demands of increased air traffic and Single European Sky requirements.
The objec�ve of FINEST is to achieve op�mal performance in the areas of service provision, cost-efficiency, capacity, flight efficiency, con�nuity and safety. This has been expected to be achieved by providing dynamic cross-border service with common technical system infrastructure from two loca�ons.
LSSIP Year 2023 Estonia 41 Working Level Agreed
The project was kicked off in 2018 and since then, both EANS and Fintraffic ANS have been working together, involving also other par�es in both countries, to both legally and technically make the service provision in the shared airspace happen. FINEST is planned to be launched in phases. ANSP-s have harmonized the ATM System parameters in 2020, have installed the upgraded version of ATM System TopSky on both sides in spring 2021. At the beginning of 2022 EANS finalized airspace changes which is the enabler for the cross border FINEST project and harmonized opera�onal procedures. Due to geopoli�cal situa�on the approval for the project from MoDs have been delayed as addi�onal concerns were raised. Throughout the year 2023 the dialogue with owners and MoDs were kept open to define the way for approval in the changed geopoli�cal situa�on. The cross-border service provision shall be ini�ated a�er the final approval from both Sates.
LSSIP Year 2023 Estonia 42 Working Level Agreed
5 Detailed Objec�ves Implementa�on progress
Objective/Stakeholder Progress Code:
Completed Not yet planned
Ongoing Not Applicable
Planned Missing Data
In 2023, there was a greater focus on mee�ng the requirements of CP1, and several ac�vi�es were completed. Yet some projects have got a delay, and some have been postponed (Due to luck of human resource and budget-related issues).
Main Objectives
AOM13.1
Harmonise Opera�onal Air Traffic (OAT) and General Air Traffic (GAT) Handling Timescales: Ini�al opera�onal capability: 01/01/2012 Full opera�onal capability: 31/12/2018
56 Ongoing
- Ac�vity should be completed by the end 2024. 31/12/2024
REG (By:12/2018) Estonian Air Force (MIL) 40% Ongoing Estonian na�onal military avia�on regula�ons are in force. Review of IFR OAT harmonisa�on procedures is postponed to 2024. - 31/12/2024
Estonian Transport Administra�on 40% Ongoing Objec�ve is in late status. The ac�vity was not completed in 2023 due to ongoing lack of HUM resources. - 31/12/2024
ASP (By:12/2018) EANS 100% Completed Objec�ve ac�vi�es completed by EANS. - 28/02/2022 Estonian Air Force (MIL) 100% Completed Estonian na�onal military avia�on regula�ons are in force. TRG is done. - 31/12/2021
MIL (By:12/2018) Estonian Air Force (MIL) 20% Ongoing Estonian AF will connect na�onal route structures and arrangements to form a flexible system facilita�ng OAT-IFR cross-border flights across Europe and implement harmonized military flight planning for OAT cross-border opera�ons.
- 31/12/2024
SDP 3.1.2 AOM19.4
Management of Predefined Airspace Configura�ons Timescales: Ini�al opera�onal capability: 01/01/2018 Full Opera�onal Capability / Target Date: 31/12/2022
100 Completed
- Objec�ve completed. 27/01/2022
ASP (By:12/2022) EANS 100% Completed
LSSIP Year 2023 Estonia 43 Working Level Agreed
SDP 3.1.2 AOM19.4
Management of Predefined Airspace Configura�ons Timescales: Ini�al opera�onal capability: 01/01/2018 Full Opera�onal Capability / Target Date: 31/12/2022
100 Completed
Objec�ve completed. - 27/01/2022
SDP 3.1.1 AOM19.5
ASM and A-FUA Timescales: Ini�al Opera�onal Capability: 01/01/2014 Full Opera�onal Capability / Target Date: 31/12/2022
100 Completed
- The status of the objec�ve is "late", since project relates to the FINEST project. FINEST was postponed from the co-opera�onal State side. Nonetheless, according to the last feedback received from SDM AF3 Experts (27 Feb 2023): EANS is already compliant even if using a local ASM and not having any automated connec�on with ATC system at the moment, but manually triggering reserved areas on ATCOs CWPs. This automated exchange shall be there for AF5 target date (31.12.2025).
31/12/2021
ASP (By:12/2022) EANS 100% Completed 2022 was planned common ASM system with FINEST CROSS BDRY service, but project postponed. Fully completed when LARA-Topsky interface is implemented. Nonetheless, according to the last feedback received from SDM AF3 Experts (27 Feb 2023): EANS is already compliant even if using a local ASM and not having any automated connec�on with ATC system at the moment, but manually triggering reserved areas on ATCOs CWPs. This automated exchange shall be there for AF5 target date (31.12.2025).
- 31/12/2021
SDP 3.2.1 AOM21.2
Ini�al Free Route Airspace Timescales: Ini�al opera�onal capability: 01/01/2015 Full Opera�onal Capability / Target Date: 31/12/2022
100 Completed
- Free Route Airspace was implemented within NEFAB area on 12 November 2015. 12/11/2015
ASP (By:12/2022) EANS 100% Completed
NEFAB Free Route Airspace was implemented on 12 November 2015. Borealis FRA
Implementa�on (Part 2)
12/11/2015
SDP 3.2.2 AOM21.3
Enhanced Free Route Airspace Opera�ons Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
100 Completed
- Completed. 23/04/2020
ASP (By:12/2025) EANS 100% Completed
LSSIP Year 2023 Estonia 44 Working Level Agreed
SDP 3.2.2 AOM21.3
Enhanced Free Route Airspace Opera�ons Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
100 Completed
- The neighbouring countries with which they have cross-border FRA opera�ons (being) implemented: Latvia, Finland, Sweden. - The TMAs with which FRA connec�vity to TMAs (being) implemented: Helsinki TMA ja Tallinn TMA. - Time limita�ons: NIL - Flight Level: FL095+ excl Tallinn TMA ja Helsinki TMA - Published Constraints: restric�ons Estonian AIP ENR3.3, ENR1 FRA General procedures, ENR 3.5, ENR4.4 (FRA relevance). - Area of Responsibility: Tallinn FIR, NEFRA
- 23/04/2020
AOP04.1
Advanced Surface Movement Guidance and Control System A-SMGCS Surveillance Service (former ICAO Level 1) Timescales: Ini�al opera�onal capability: 01/01/2007 Full opera�onal capability: 31/12/2020
100 Completed
EETN - Tallinn Airport A-SMGCS Level 1 system is implemented on 10 February 2011. 31/12/2013
REG (By:12/2010) Estonian Transport Administra�on 100% Completed Transponder opera�ng procedures are published in the AIP. - 31/12/2013
ASP (By:01/2021) EANS 100% Completed A-SMGCS system on the Tallinn airport is implemented on February, 10 2011. - 28/02/2011
APO (By:01/2021) TALLINN AIRPORT Ltd. 100% Completed A-SMGCS system on the Tallinn airport is implemented on February 10 2011. - 28/02/2011
AOP04.2
Advanced Surface Movement Guidance and Control System (A-SMGCS) Runway Monitoring and Conflict Aler�ng (RMCA) (Airport Safety Support Service = former ICAO Level 2) Timescales: Ini�al opera�onal capability: 01/01/2021 Full opera�onal capability: 31/12/2025
100 Completed
EETN - Tallinn Airport A-SMGCS Level II system at Tallinn Airport is implemented on 10 February 2011. 28/02/2011
ASP (By:12/2025) EANS 100% Completed A-SMGCS Level II system at the Tallinn airport is implemented on 10 February 2011. - 28/02/2011
APO (By:12/2025) TALLINN AIRPORT Ltd. 100% Completed A-SMGCS Level II system at Tallinn Airport is implemented on 10 February 2011. - 28/02/2011
AOP05
Airport Collabora�ve Decision Making (A-CDM) Timescales: Ini�al opera�onal capability: 01/01/2004 Full opera�onal capability: 31/12/2020
1 Ongoing
EETN - Tallinn Airport
LSSIP Year 2023 Estonia 45 Working Level Agreed
AOP05
Airport Collabora�ve Decision Making (A-CDM) Timescales: Ini�al opera�onal capability: 01/01/2004 Full opera�onal capability: 31/12/2020
1 Ongoing
EANS and Tallinn airport postponed the implementa�on of A-CDM at Tallinn aerodrome. A-CDM should be implemented in the frame of project Airport 4.0. 31/12/2030
ASP (By:01/2021)
EANS 0% Not yet planned
The full implementa�on of A-CDM is currently not planned, and a more detailed analysis is planned in 2025.
Tallinn Airport A- CDM
implementa�on project
-
APO (By:01/2021) TALLINN AIRPORT Ltd. 2% Ongoing
The full implementa�on of A-CDM is currently not planned. More detailed analysis is planned in 2025.
Tallinn Airport A- CDM
implementa�on project
31/12/2030
AOP10 Time-Based Separa�on Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport No opera�onal need to implement TBS in EETN -
REG (By:01/2024)
Estonian Transport Administra�on 0% Not Applicable
No opera�onal need to implement TBS in EETN - - ASP (By:12/2024)
EANS 0% Not Applicable
No opera�onal need to implement TBS in EETN - -
SDP 2.2.1 AOP11.1
Ini�al Airport Opera�ons Plan Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport N/A for EETN AD, according to bilateral mee�ng Bilateral mee�ng NEFAB. -
ASP (By:12/2023)
EANS 0% Not Applicable
N/A. - - APO (By:12/2023)
SDP 2.2.2 AOP11.2
Extended Airport Opera�ons Plan Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport Outside of applicability area, EETN is non-CP1 Airport. -
ASP (By:12/2027)
EANS 0% Not Applicable
Outside of applicability area. - - APO (By:12/2027)
LSSIP Year 2023 Estonia 46 Working Level Agreed
SDP 2.2.2 AOP11.2
Extended Airport Opera�ons Plan Timescales: - not applicable -
0 Not Applicable
TALLINN AIRPORT Ltd. 0% Not Applicable
EETN is non-CP1 Airport. - -
SDP 2.3.1 AOP12.1
Airport Safety Nets Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport N/A for EETN AD, according to bilateral mee�ng and MPL3 Plan 2022_Technical Annex_v1.1_ANNEX 3 – APPLICABILITY TO AIRPORTS -
ASP (By:12/2025)
EANS 0% Not Applicable
N/A. - - APO (By:12/2025)
AOP13
Automated Assistance to Controller for Surface Movement Planning and Rou�ng Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport No opera�onal need in EETN -
REG (By:12/2025)
Estonian Transport Administra�on 0% Not Applicable
No opera�onal need in EETN - - ASP (By:12/2025)
EANS 0% Not Applicable
No opera�onal need in EETN - -
SDP 2.1.1 AOP19
Departure Management Synchronised with Pre-departure sequencing Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport EETN is non-CP1 Airport -
ASP (By:12/2022)
EANS 0% Not Applicable
Outside of applicability area. - - APO (By:12/2022)
ATC02.8
Ground-Based Safety Nets Timescales: Ini�al opera�onal capability: 01/01/2009 Full opera�onal capability: 31/12/2021
100 Completed
- System is ready for use, but no demand, thereof ATC TRG NA also. Planned ac�va�on date is unknown. 31/12/2022
ASP (By:12/2021) EANS 100% Completed
LSSIP Year 2023 Estonia 47 Working Level Agreed
ATC02.8
Ground-Based Safety Nets Timescales: Ini�al opera�onal capability: 01/01/2009 Full opera�onal capability: 31/12/2021
100 Completed
MSAW and APM func�ons are technically available in ATM system, however, due to no opera�onal demand and low ground structure, there is no need to ac�vate MSAW and APM func�ons. APW func�on is implemented.
- 31/12/2022
ATC07.1 AMAN Tools and Procedures Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport There is no opera�onal need for basic AMAN. No forecast indica�ng the need. However, EANS is using AMAN for Helsinki inbound traffic and affected by ESSA extended AMAN plans.
-
ASP (By:01/2020)
EANS 0% Not Applicable
There is no opera�onal need for basic AMAN. No forecast indica�ng the need. However, we are using AMAN for Helsinki inbound traffic and affected by ESSA extended AMAN plans.
- -
ATC12.1
Automated Support for Conflict Detec�on, Resolu�on Support Informa�on and Conformance Monitoring Timescales: Ini�al opera�onal capability: 01/01/2015 Full opera�onal capability: 31/12/2021
100 Completed
- MTCD, resolu�on support func�on and MONA are available since 2012. No definite plans to implement TCT. 31/05/2012
ASP (By:12/2021) EANS 100% Completed MTCD, resolu�on support func�on and MONA are available since 2012. No definite plans to implement TCT. - 31/05/2012
ATC15.1
Informa�on Exchange with En-route in Support of AMAN Timescales: Ini�al opera�onal capability: 01/01/2012 Full opera�onal capability: 31/12/2019
100 Completed
- In En-Route opera�ons, informa�on exchange mechanisms, tools and procedures are implemented. 31/01/2017
ASP (By:12/2019) EANS 100% Completed In En-Route opera�ons, informa�on exchange mechanisms, tools and procedures are implemented. - 31/01/2017
SDP 1.1.1 ATC15.2
Arrival Management Extended to En-route Airspace Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport N/A for EETN AD, EETN AD is non-CP1. -
ASP (By:12/2024)
EANS 0% Not Applicable
Tallinn Airport is not listed in CP1 Geographical Scope. - -
LSSIP Year 2023 Estonia 48 Working Level Agreed
SDP 1.2.1 ATC19
AMAN/DMAN Integra�on Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport N/A for EETN AD, Tallinn Airport is not listed in CP1 Geographical Scope. -
ASP (By:12/2027)
EANS 0% Not Applicable
No planned ac�vi�es. Tallinn Airport is not listed in CP1 Geographical Scope. - - APO (By:12/2027)
TALLINN AIRPORT Ltd. 0% Not Applicable
Not planned, Tallinn Airport is not listed in CP1 Geographical Scope. - -
SDP 6.1.2 ATC23
Ini�al Air-Ground Trajectory Informa�on Sharing (Ground Domain) Timescales: Ini�al Opera�onal Capability: 01/01/2024 Full Opera�onal Capability / Target Date: 31/12/2027
0 Not yet planned
- The objec�ve is not planned yet. -
ASP (By:12/2027)
EANS 0% Not yet planned
The objec�ve is not planned yet. - -
SDP 6.3.1 ATC25
Ini�al Trajectory Informa�on Sharing ground distribu�on Timescales: Ini�al Opera�onal Capability: 01/01/2024 Full Opera�onal Capability / Target Date: 31/12/2027
0 Not yet planned
- Not yet planned. -
ASP (By:12/2027)
EANS 0% Not yet planned
Not yet planned. Currently we are looking into the possibility to join the ACDLS. - -
COM10.2
Extended AMHS Timescales: Ini�al Opera�onal Capability: 01/12/2011 Full Opera�onal Capability: 31/12/2024
100 Completed
- AMHS capability is available, tested, validated, but not in use yet. 12/10/2021
ASP (By:12/2024) EANS 100% Completed Capability is available, tested, validated, but not in use. There is no need for enhanced capability. - 12/10/2021
COM11.1
Voice over Internet Protocol (VoIP) in En-Route Timescales: Ini�al opera�onal capability: 01/01/2013 Full opera�onal capability: 31/12/2021
100 Completed
- The VCS project was completed by 23. March 2023. 23/03/2023
ASP (By:12/2021)
LSSIP Year 2023 Estonia 49 Working Level Agreed
EANS 100% Completed The VCS project completed. The new MAIN VoIP VCS and B-up VCS are opera�onal. - 23/03/2023
COM11.2
Voice over Internet Protocol (VoIP) in Airport/Terminal Timescales: Ini�al opera�onal capability: 01/01/2013 Full opera�onal capability: 31/12/2023
100 Completed
- Ac�vi�es are completed, related to the development of remote tower. EETU AD remote Aerodrome Flight Informa�on Service is cer�fied on 20.04.2023. 20/04/2023
ASP (By:12/2023) EANS 100% Completed Ac�vi�es are completed, related to the development of remote tower. - 20/04/2023
COM12
New Pan-European Network Service (NewPENS) Timescales: Ini�al opera�onal capability: 01/01/2018 Full opera�onal capability: 31/12/2024
100 Completed
- CPA has been signed. EANS migrated to NewPENS in July 2019. AD has announced on JAN 2021, that they have no plans to migrate into the NewPENS. 31/07/2019
ASP (By:12/2024) EANS 100% Completed EANS migrated to NewPENS in July 2019. - 31/07/2019
APO (By:12/2024)
TALLINN AIRPORT Ltd. 0% Not Applicable
AD has no plans to migrate into the NewPENS. - -
ENV01
Con�nuous Descent Opera�ons (CDO) Timescales: Ini�al opera�onal capability: 01/07/2007 Full opera�onal capability: 31/12/2023
100 Completed
EETN - Tallinn Airport CDO and P-RNAV procedures were implemented in Tallinn TMA 30 May 2013. Performance monitoring is done. 31/12/2023
ASP (By:12/2023) EANS 100% Completed EANS implemented P-RNAV and CDO techniques in May 2013. Performance monitoring by ANSP side is done via Eurocontrol site htps://ansperformance.eu/ and also in coopera�on with Tallinn Airport.
- 31/12/2023
APO (By:12/2023) TALLINN AIRPORT Ltd. 100% Completed Monitoring of performance is established, data received from EANS. - 31/12/2017
FCM03
Collabora�ve Flight Planning Timescales: Ini�al opera�onal capability: 01/01/2000 Full opera�onal capability: 31/12/2022
100 Completed
-
LSSIP Year 2023 Estonia 50 Working Level Agreed
Func�onality installed and available but problems so far at NM within automa�cally processing and firmly specifying the use of AFP-messages in the Free Route Airspace environment causes that full FoC implementa�on of collabora�ve flight planning. Though all func�onality has been installed according to spec, the interoperability between Thales TopSky and NM system has not been achieved due to complicated FRA opera�ons environment, not fully covered at NM.
01/01/2023
ASP (By:12/2022) EANS 100% Completed Func�onality installed and available but problems so far at NM within automa�cally processing and firmly specifying the use of AFP-messages in the Free Route Airspace environment causes that full FoC implementa�on of collabora�ve flight planning. Though all func�onality has been installed according to spec, the interoperability between Thales TopSky and NM system has not been achieved due to complicated FRA opera�ons environment, not fully covered at NM.
- 01/01/2023
SDP 4.1.1 FCM04.2
Enhanced Short Term ATFCM Measures Timescales: Ini�al opera�onal capability: 01/11/2017 Full Opera�onal Capability / Target Date: 31/12/2022
100 Completed
- STAM is in opera�onal use in accordance to NM CHMI and related training package. 30/06/2023
ASP (By:12/2022) EANS 100% Completed EANS is using NM STAM so�ware tool, and all the needed trainings are completed. - 30/06/2023
SDP 4.3.1 FCM06.1
Automated Support for Traffic Complexity Assessment and Flight Planning interfaces Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target date: 31/12/2022
100 Completed
- ANSP EANS relies to NM system support & development and is using CHMI and NMP Flow applica�on. Processing of APL and ACL messages is completed.
31/12/2023
ASP (By:12/2022) EANS 100% Completed EANS relies to NM system support & development and is using CHMI and NMP Flow applica�on. Processing of APL and ACL messages is completed.
- 31/12/2023
SDP 4.2.1 FCM10
Interac�ve Rolling NOP Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2023
100 Completed
- Objec�ve FCM10 does not apply to Tallinn Airport, therefore SLoA FCM10-APO01 is marked N/A. Which brings FCM10 to ‘Completed’. 30/06/2023
ASP (By:12/2023) EANS 100% Completed CHMI updates and related trainings done. - 30/06/2023
APO (By:12/2023)
LSSIP Year 2023 Estonia 51 Working Level Agreed
SDP 4.2.1 FCM10
Interac�ve Rolling NOP Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2023
100 Completed
TALLINN AIRPORT Ltd. 0% Not Applicable
According to NEFAB Bilateral mee�ng informa�on, objec�ve FCM10 does not apply to Tallinn Airport. - -
SDP 4.2.2 FCM11.1
Ini�al AOP/NOP Informa�on Sharing Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport EETN AD is non-CP1, N/A according to MPL3 Plan 2023 Technical Annex, Annex 3. Nevertheless A-CDM for EETN AD is s�ll in plans, more detailed informa�on is expected to come on 2025.
-
ASP (By:12/2023)
EANS 0% Not Applicable
Outside applicability area. - - APO (By:12/2023)
SDP 4.4.1 FCM11.2
AOP/NOP integra�on Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport EETN AD is non-CP1 Airport, N/A according to MPL3 Plan 2023 Technical Annex 3. -
ASP (By:12/2027)
EANS 0% Not Applicable
Outside applicability area. - - APO (By:12/2027)
INF07
Electronic Terrain and Obstacle Data (eTOD) Timescales: Ini�al opera�onal capability: 01/11/2014 Full opera�onal capability: 31/12/2018
6 Ongoing
- Process is in late status due to constant lack of human resources in NSA. Electronic TOD should be established by 31 December 2024. 31/12/2025
REG (By:01/2019) Estonian Transport Administra�on 8% Ongoing Process is in late status due to constant lack of human resources in NSA. Electronic TOD should be established by 31 December 2024. - 31/12/2024
ASP (By:01/2019) EANS 5% Ongoing No progress compared to last year, EANS cannot con�nue any ac�vity before Na�onal TOD Policy is available. - 31/12/2025
APO (By:01/2019) TALLINN AIRPORT Ltd. 5% Ongoing All AO related ac�vi�es will be performed a�er Na�onal TOD Policy is available. - 31/12/2025
LSSIP Year 2023 Estonia 52 Working Level Agreed
SDP 5.2.1 INF10.2
Stakeholders’ SWIM PKI and cyber security Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
13 Ongoing
- Process is slowly ongoing. 31/12/2025
ASP (By:12/2025) EANS 8% Ongoing EANS will be using the EACP solu�on. - 31/12/2024
APO (By:12/2025)
TALLINN AIRPORT Ltd. 0% Not yet planned
AD has not yet decided, with what to go further and how. Discussions with other local Stakeholders are ongoing. - -
MET (By:12/2025) Estonian Environment Agency 18% Ongoing NIL - 31/12/2025
SDP 5.3.1 INF10.3
Aeronau�cal Informa�on Exchange - Airspace structure service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
100 Completed
- LARA adapted/in use. 10/06/2020
ASP (By:12/2025) EANS 100% Completed LARA is used according to their installa�on. - 10/06/2020
SDP 5.3.1 INF10.4
Aeronau�cal Informa�on Exchange - Airspace Availability Service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
100 Completed
- ANSP has ASM system LARA which provides the AUP/UUP to NM. 31/12/2022
ASP (By:12/2025) EANS 100% Completed EANS has ASM system LARA which provides the AUP/UUP to NM. EANS is par�cipa�ng in LARA user group and also following the ac�vi�es of "ASM SWIM" project ac�vi�es to ensure the compliance of LARA tool.
- 31/12/2022
SDP 5.3.1 INF10.5
Aeronau�cal Informa�on Exchange - Airspace Reserva�on (ARES) Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
3 Ongoing
- LARA is in use. ARES info is visible to all LARA customers who have access to LARA. ANSP is wai�ng for release v5, when LARA will enable to implement the full scope of ARES exchanges via SWIM.
31/12/2024
ASP (By:12/2025) EANS 3% Ongoing
LSSIP Year 2023 Estonia 53 Working Level Agreed
LARA is used. ARES info is visible to all LARA customers who have access to LARA. Systems are used according to their installa�on. Wai�ng for release v5, when LARA will enable to implement the full scope of ARES exchanges via SWIM.
- 31/12/2024
SDP 5.3.1 INF10.6
Aeronau�cal Informa�on Exchange – Digital NOTAM service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
64 Ongoing
- Will be implemented with SWIM and informa�on exchange system developments, systems planned to be ready 2025. 31/12/2025
ASP (By:12/2025) EANS 0% Planned EANS is par�cipa�ng in project ACADIA to ensure accordance. Ac�vi�es started in 2023 and objec�ve is planned to be in opera�onal use by 2025.
EANS Support to ACADIA 31/12/2025
AIS (By:12/2025) EANS 80% Ongoing EANS is par�cipa�ng in project ACADIA to ensure accordance. Ac�vi�es are ongoing in the project plan.
EANS Support to ACADIA 31/12/2025
SDP 5.3.1 INF10.7
Aeronau�cal Informa�on Exchange - Aerodrome mapping service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Ongoing
- Outside of the area of applicability. Nevertheless ANSP is par�cipa�ng in the ACADIA project and aerodrome mapping service is also in the scope.
31/12/2025
AIS (By:12/2025) EANS 10% Ongoing EANS is par�cipa�ng in the ACADIA project and aerodrome mapping service is also in the scope.
EANS Support to ACADIA 31/12/2025
SDP 5.3.1 INF10.8
Aeronau�cal Informa�on Exchange - Aeronau�cal Informa�on Features service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
8 Ongoing
- Ac�vi�es are part of ACADIA project. 31/12/2025
ASP (By:12/2025) EANS 0% Planned
Ac�vi�es part of ACADIA project. EANS Support to ACADIA 31/12/2025
AIS (By:12/2025) EANS 10% Ongoing
Ongoing, ac�vi�es part of ACADIA project. EANS Support to ACADIA 31/12/2025
LSSIP Year 2023 Estonia 54 Working Level Agreed
SDP 5.4.1 INF10.9
Meteorological Informa�on Exchange - Volcanic Ash Mass Concentra�on informa�on service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
3 Ongoing
- Implementa�on should be via ANSP co-opera�on ready for 31.12.2025. 31/12/2025
ASP (By:12/2025) EANS 0% Planned We are planning system upgrades to consume SWIM MET services, depends on MET service provider. - 31/12/2025
MET (By:12/2025) Estonian Environment Agency 3% Ongoing We are planning system upgrades to provide SWIM MET services, poten�al coopera�on with NamCon countries to be clarified during 2024. For the Volcanic Ash Mass Concentra�on Informa�on Service, it is clarified that this informa�on will be provided in SWIM format by the VAACs. The VAACs expects to be fully opera�onal by 2024; ESTEA as MET Provider will contact the UK MET Office and Meteo France in order to discuss the service defini�on in view of the future consump�on of the informa�on.
- 31/12/2025
SDP 5.4.1 INF10.10
Meteorological Informa�on Exchange - Aerodrome Meteorological informa�on Service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
47 Ongoing
- SWIM implementa�on should be ready on 2025. MET ANSP is serving AD and its users as demanded by IR (EU) 2017/373 using TAC/IWXXM. 31/12/2025
ASP (By:12/2025) EANS 0% Planned Depends on MET service provider. - 31/12/2025
APO (By:12/2025) TALLINN AIRPORT Ltd. 0% Planned AS Tallinna Lennujaam (Tallinn Airport Ltd.) is not MET service provider, the service is provided by Environmental Agency (Keskkonnaagentuur) from August 2020.
- 31/12/2024
MET (By:12/2025) Estonian Environment Agency 53% Ongoing MET ANSP is serving AD and its users as demanded by IR (EU) 2017/373 using TAC/IWXXM. - 31/12/2025
SDP 5.4.1 INF10.11
Meteorological Informa�on Exchange - En-Route and Approach Meteorological informa�on service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
5 Ongoing
- SWIM implementa�on should be ready in 2025. 31/12/2025
ASP (By:12/2025) EANS 0% Planned We are planning system upgrades to consume SWIM MET services. - 31/12/2025
MET (By:12/2025) Estonian Environment Agency 7% Ongoing We are planning to provide services accordingly SWIM MET services, poten�al coopera�on within NamCon countries for development. - 31/12/2025
LSSIP Year 2023 Estonia 55 Working Level Agreed
SDP 5.4.1 INF10.12
Meteorological Informa�on Exchange - Network Meteorological Informa�on Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Planned
- SWIM PKI etc. implementa�on should be ready in 2025. ATS ANSP is planning to consume SWIM MET services. 31/12/2025
ASP (By:12/2025) EANS 0% Planned We are planning system upgrades to consume SWIM MET services. - 31/12/2025
MET (By:12/2025)
Estonian Environment Agency 0% Not Applicable
ESTEA do not contribute in EUMETNET CBCF, so we are not mandated to provide the service. - -
SDP 5.5.1 INF10.13
Coopera�ve Network Informa�on Exchange - ATFCM Tac�cal Updates Service (Airport Capacity and Enroute) Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Not Applicable
- Not applicable. -
ASP (By:12/2025)
EANS 0% Not Applicable
Applies only if local complexity tool is used. N/A for this monitoring cycle. - -
SDP 5.5.1 INF10.14
Coopera�ve Network Informa�on Exchange – Flight Management Service (Slots and NOP/AOP integra�on) Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Not Applicable
- As per SDM instruc�ons, Estonia is not mandated to implement iAOP/eAOP (Tallinn Airport is exempted from the implementa�on of (i)AOP). Thereof this objec�ve is reported as Not Applicable,
-
ASP (By:12/2025)
EANS 0% Not Applicable
As per SDM instruc�ons as Estonia is not mandated to implement iAOP/eAOP, this Objec�ve can be reported as Not Applicable. - -
APO (By:12/2025)
TALLINN AIRPORT Ltd. 0% Not Applicable
Not planned either. - -
SDP 5.5.1 INF10.15
Coopera�ve Network Informa�on Exchange – Measures Service (Traffic Regula�on) Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Not Applicable
- Not applicable. -
ASP (By:12/2025)
LSSIP Year 2023 Estonia 56 Working Level Agreed
EANS 0% Not Applicable
Applies only if local complexity tool is used. N/A for this monitoring cycle. - -
SDP 5.5.1 INF10.16
Coopera�ve Network Informa�on Exchange - Short Term ATFCM Measures services (MCDM, eHelpdesk, STAM measures) Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Not Applicable
- Not applicable. -
ASP (By:12/2025)
EANS 0% Not Applicable
Applies only if local complexity tool is used. N/A for this monitoring cycle. - -
SDP 5.5.1 INF10.17
Coopera�ve Network Informa�on Exchange – Counts service (ATFCM Conges�on Points) Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Not Applicable
- Not applicable. -
ASP (By:12/2025)
EANS 0% Not Applicable
Applies only if local complexity tool is used. N/A for this monitoring cycle. - -
SDP 5.6.1 INF10.19
Flight Informa�on Exchange (Yellow Profile) - Flight Data Request Service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Planned
- Planned to reach objec�ve according to SP ac�vi�es. 31/12/2030
ASP (By:12/2025) EANS 0% Planned
LSSIP Year 2023 Estonia 57 Working Level Agreed
SDP 5.6.1 INF10.19
Flight Informa�on Exchange (Yellow Profile) - Flight Data Request Service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Planned
Planned to consume NM B2B services: - ARO briefing systems by 2024 - ac�vi�es ongoing. - ATM systems: TWR systems 2028 (according to CP1 not an obliga�on) and ACC 2030 - ac�vi�es planned. ATM system provider not fully decided. - rTWR: TBD (according to CP1 not an obliga�on). ARO systems: The system will be extended to support the submission of FPL and update messages via NM B2B using their FF-ICE services. The following transforma�ons are done from current message input to service: FilingService: FPL: FiledFlightPlanRequest CHG: FlightPlanUpdateRequest DLA: FlightPlanUpdateRequest CNL: FlightPlanCancella�onRequest TrialService: FPL valida�on only: TrialRequest FlightDataRequestService: RQP: FlightDataRequest RQS: FlightDataRequest No�fica�onService: DEP: FlightDepartureRequest ARR: FlightArrivalRequest When in the Center Terminal a message with above type is sent to the IFPS, then the corresponding B2B service is used for transmi�ng the data via FFICE service instead of AFTN/AMHS message. A system parameter allows to enable/disable the submission of the data via NM B2B. When disabled the message is sent out in the tradi�onal way via AFTN/AMHS ICAO text messages.
- 31/12/2030
SDP 5.6.1 INF10.20
Flight Informa�on Exchange (Yellow Profile) - No�fica�on Service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Planned
- Planned according to SP ac�vi�es. 31/12/2030
ASP (By:12/2025) EANS 0% Planned
LSSIP Year 2023 Estonia 58 Working Level Agreed
SDP 5.6.1 INF10.20
Flight Informa�on Exchange (Yellow Profile) - No�fica�on Service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Planned
Planned to consume NM B2B services (ATM systems and ARO briefing). - ARO briefing systems by 2025 - ac�vi�es ongoing. - ATM systems: TWR systems 2028 (not CP1 obliga�on) and ACC 2030 - ac�vi�es planned (ATM system provider not fully decided). - rTWR: TBD (not CP1 obliga�on). ARO systems: The system will be extended to support the submission of FPL and update messages via NM B2B using their FF-ICE services. The following transforma�ons are done from current message input to service: FilingService: FPL: FiledFlightPlanRequest CHG: FlightPlanUpdateRequest DLA: FlightPlanUpdateRequest CNL: FlightPlanCancella�onRequest TrialService: FPL valida�on only: TrialRequest FlightDataRequestService: RQP: FlightDataRequest RQS: Flight Data Request No�fica�onService: DEP: FlightDepartureRequest ARR: FlightArrivalRequest When in the Center Terminal a message with above type is sent to the IFPS, then the corresponding B2B service is used for transmi�ng the data via FFICE service instead of AFTN/AMHS message. A system parameter allows to enable/disable the submission of the data via NM B2B. When disabled the message is sent out in the tradi�onal way via AFTN/AMHS ICAO text messages.
- 31/12/2030
SDP 5.6.1 INF10.21
Flight Informa�on Exchange (Yellow Profile) - Data Publica�on Service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Planned
- Planned according to SP ac�vi�es. 31/12/2030
ASP (By:12/2025) EANS 0% Planned
LSSIP Year 2023 Estonia 59 Working Level Agreed
SDP 5.6.1 INF10.21
Flight Informa�on Exchange (Yellow Profile) - Data Publica�on Service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Planned
Planned to consume NM B2B services (ATM systems and ARO briefing). ARO systems will be ready by 2025, ATM systems by 2030. ARO systems: The system will be extended to support the submission of FPL and update messages via NM B2B using their FF-ICE services. The following transforma�ons are done from current message input to service: FilingService: FPL: FiledFlightPlanRequest CHG: FlightPlanUpdateRequest DLA: FlightPlanUpdateRequest CNL: FlightPlanCancella�onRequest TrialService: FPL valida�on only: TrialRequest FlightDataRequestService: RQP: FlightDataRequest RQS: FlightDataRequest No�fica�onService: DEP: FlightDepartureRequest ARR: FlightArrivalRequest When in the Center Terminal a message with above type is sent to the IFPS, then the corresponding B2B service is used for transmi�ng the data via FFICE service instead of AFTN/AMHS message. A system parameter allows to enable/disable the submission of the data via NM B2B. When disabled the message is sent out in the tradi�onal way via AFTN/AMHS ICAO text messages.
- 31/12/2030
SDP 5.6.1 INF10.23
Flight Informa�on Exchange (Yellow Profile) - Extended AMAN SWIM Service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Not Applicable
- N/A as there are no domes�c airports to which this applies (EETN AD is not CP1 AD). -
ASP (By:12/2025)
EANS 0% Not Applicable
N/A as there are no domes�c airports to which this applies. - -
ITY-ACID
Aircra� Iden�fica�on Timescales: Entry into force of the Regula�on: 13/12/2011 System capability: 02/01/2020
92 Ongoing
- EANS have sent template for Mode S Declara�on to NM on 30/01/2020, confirming that Mode S is implemented in Tallinn FIR above FL95. System will be fully implemented when neighbouring ANSP-s have the capability as well.
31/12/2024
LSSIP Year 2023 Estonia 60 Working Level Agreed
ITY-ACID
Aircra� Iden�fica�on Timescales: Entry into force of the Regula�on: 13/12/2011 System capability: 02/01/2020
92 Ongoing
ASP (By:01/2020) EANS 92% Ongoing EANS have sent template for Mode S Declara�on to NM on 30/01/2020, confirming that Mode S is implemented in Tallinn FIR above FL95. According to the response from NM, the system can only be implemented when neighbouring countries are ready. Will be fully implemented when neighbouring ANSP-s have the capability.
- 31/12/2024
ITY-AGDL
Ini�al ATC Air-Ground Data Link Services Timescales: Entry into force: 06/02/2009 ATS unit opera�onal capability: 05/02/2018 Aircra� capability: 05/02/2020
100 Completed
- Estonia implemented CPDLC in Tallinn FIR in June 2018. LOF and NAN implementa�on finished 30.12.2021. 30/12/2021
REG (By:02/2018) Estonian Transport Administra�on 100% Completed ECAA will ensure the processing and the distribu�on of the informa�on on the data link capability by the IFPS. - 30/04/2018
ASP (By:02/2018) EANS 100% Completed Implementa�on was finished in June 2018 (SITA 06.04.2018, ARINC 28.06.2018). Procedures implemen�ng the Next Authority process is implemented with Sweden, Finland (2021) and Latvia (2021).
Air-ground data link
implementa�on 30/12/2021
MIL (By:01/2019)
Estonian Air Force (MIL) 0% Not Applicable
Data link capability is not required. - -
ITY-AGVCS2
8,33 kHz Air-Ground Voice Channel Spacing below FL195 Timescales: Entry into force: 07/12/2012 New and upgraded radio equipment: 17/11/2013 New or upgraded radios on State aircra�: 01/01/2014 Interim target for freq. conversions: 31/12/2014 All radio equipment: 31/12/2017 All frequencies converted: 31/12/2018 State aircra� equipped, except those no�fied to EC: 31/12/2018 State aircra� equipped, except those exempted [Art 9(11)]: 31/12/2020
100 Completed
- Tallinn FIR radio renewed according to Implemen�ng Regula�on (EU) No 1079/2012 in December 2015. 31 frequencies converted on 02/01/2020. Estonia has 61 frequencies, from which 49 are converted as of 03/01/2020 (was reported to SAFIRE Data base). 9 frequencies are exempted (shall be converted on 2027), 3 are interna�onal frequencies, which should not be converted.
02/01/2020
REG (By:12/2018) Estonian Transport Administra�on 100% Completed Tallinn FIR radio renewed according to Implemen�ng Regula�on (EU) No 1079/2012 in December 2015. Frequency converted on 02/01/2020. - 02/01/2020
ASP (By:12/2018)
LSSIP Year 2023 Estonia 61 Working Level Agreed
ITY-AGVCS2
8,33 kHz Air-Ground Voice Channel Spacing below FL195 Timescales: Entry into force: 07/12/2012 New and upgraded radio equipment: 17/11/2013 New or upgraded radios on State aircra�: 01/01/2014 Interim target for freq. conversions: 31/12/2014 All radio equipment: 31/12/2017 All frequencies converted: 31/12/2018 State aircra� equipped, except those no�fied to EC: 31/12/2018 State aircra� equipped, except those exempted [Art 9(11)]: 31/12/2020
100 Completed
EANS 100% Completed Frequency converted on 02/01/2020. - 02/01/2020
MIL (By:12/2020) Estonian Air Force (MIL) 100% Completed All of the State aircra� are equipped with 8,33 kHz radios. - 31/12/2018
APO (By:12/2018) TALLINN AIRPORT Ltd. 100% Completed There are 2 working channels on EETN AD, what are converted accordingly. REF EST AIP AD 2.EETN, EETN AD 2.18. Non-8,33 kHz equipped vehicles do not communicate with aircra�s.
- 02/01/2020
Estonian Air Force (MIL) 0% Not Applicable
NATO combined frequency requirements will maintain the 122,100 MHz frequency in 25 kHz channel spacing un�l a suitable alterna�ve is found. - -
ITY-FMTP
Common Flight Message Transfer Protocol (FMTP) Timescales: Entry into force of regula�on: 28/06/2007 All EATMN systems put into service a�er 01/01/09: 01/01/2009 All EATMN systems in opera�on by 20/04/11: 20/04/2011 Transi�onal arrangements: 31/12/2012 Transi�onal arrangements when bilaterally agreed between ANSPs: 31/12/2014
100 Completed
- A common flight message transfer protocol (FMTP) is implemented during a major system upgrade. However, IPver6 is not fully implemented. Connec�ons with Malmö and Stockholm of Sweden are opera�onal since August 2015.
31/12/2018
ASP (By:12/2014) EANS 100% Completed Completed. - 31/12/2018
MIL (By:12/2014)
Estonian Air Force (MIL) 0% Not Applicable
Military ATC do not provide RADAR services - -
NAV03.1
RNAV 1 in TMA Opera�ons Timescales: Ini�al opera�onal capability: 01/01/2001 One SID and STAR per instrument RWY, where established: 25/01/2024 All SIDs and STARs per instrument RWY, where established: 06/06/2030
97 Ongoing
EETN - Tallinn Airport
LSSIP Year 2023 Estonia 62 Working Level Agreed
RNAV 1 procedures and CDA in Tallinn TMA implemented on 30 May 2013. Estonia’s PBN Implementa�on (transi�on) plan has successfully passed consulta�on with Estonian Stakeholders and with Network Manager (NM). The Plan has also been commented by IATA. PBN Implementa�on Plan Ver 1.0 document was approved by CAA and communicated to the neighbouring ATC Centres. Naviga�on infrastructure ra�onaliza�on project was delayed due to economic crises caused by COVID 19, project is ongoing.
21/03/2024
REG (By:06/2030) Estonian Transport Administra�on 100% Completed
The transi�on plan for PBN is approved by NSA in DEC 2020. Naviga�on
Infrastructure Ra�onalisa�on
31/12/2020
ASP (By:06/2030) EANS 96% Ongoing Estonia’s PBN Implementa�on (transi�on) plan has successfully passed consulta�on with Estonian Stakeholders and with Network Manager (NM). The Plan has also been commented by IATA. PBN Implementa�on Plan Ver 1.0 document was approved by CAA and communicated to the neighbouring ATC Centres. Naviga�on infrastructure ra�onalisa�on project is ongoing.
Naviga�on Infrastructure Ra�onalisa�on
21/03/2024
NAV03.2 RNP 1 in TMA Opera�ons Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport There is no inten�on to Implement it because it is not jus�fied par�cularly in terms of the cost/benefit ra�o as RNAV1 is considered to be sufficient. -
REG (By:06/2030)
Estonian Transport Administra�on 0% Not Applicable
There is no inten�on to Implement it because it is not jus�fied par�cularly in terms of the cost/benefit ra�o as RNAV1 is considered to be sufficient. - -
ASP (By:06/2030)
EANS 0% Not Applicable
There is no inten�on to Implement it because it is not jus�fied par�cularly in terms of the cost/benefit ra�o as RNAV1 is considered to be sufficient. - -
NAV10
RNP Approach Procedures to instrument RWY Timescales: Ini�al opera�onal capability: 01/06/2011 Instrument RWY ends without precision approach in EU SES States.: 03/12/2020 Instrument RWY ends served by precision approach.: 25/01/2024
100 Completed
EETN - Tallinn Airport RNP APCH procedures are published and implemented at EETN, EEKE, EEKA, EEPU and EETU aerodromes. EANS PBN Transi�on plan has been dra�ed and submited to CAA and MIL.
21/04/2022
REG (By:01/2024) Estonian Transport Administra�on 100% Completed The na�onal PBN plan is approved by NSA in DEC 2020. - 31/12/2020
ASP (By:01/2024) EANS 100% Completed
LSSIP Year 2023 Estonia 63 Working Level Agreed
NAV10
RNP Approach Procedures to instrument RWY Timescales: Ini�al opera�onal capability: 01/06/2011 Instrument RWY ends without precision approach in EU SES States.: 03/12/2020 Instrument RWY ends served by precision approach.: 25/01/2024
100 Completed
RNP APCH procedures are published and implemented at EETN, EEKE, EEKA, EETU and EEPU aerodromes. PBN Implementa�on (transi�on) plan is approved by ECAA.
RNP APCH procedures
implementa�on on EETN
aerodrome
21/04/2022
NAV12
ATS IFR Routes for Rotorcra� Opera�ons Timescales: Rotorcra� RNP0.3, RNP1 or RNAV1 ATS routes above FL150, where established.: 03/12/2020 One rotorcra� RNP0.3, RNP01 or RNAV1 SID and STAR per instrument RWY, where established.: 25/01/2024 Rotorcra� RNP0.3, RNP1 or RNAV1 ATS routes below FL150, where established.: 25/01/2024 All rotorcra� RNP0.3, RNP01 or RNAV1 SIDs and STARs per instrument RWY, where established.: 06/06/2030
0 Not Applicable
- Tallinn FIR is FRA. ATS IFR routes for rotorcra� opera�on implementa�on are not planned. -
REG (By:06/2030)
Estonian Transport Administra�on 0% Not Applicable
Tallinn FIR is FRA. ATS IFR routes for rotorcra� opera�on implementa�on are not planned, no demand, too exiguous IFR rotocra� traffic. - -
ASP (By:06/2030)
EANS 0% Not Applicable
LLR procedures only in Tallinn CTR are completed. No other plans to implement. - -
LSSIP Year 2023 Estonia 64 Working Level Agreed
Additional Objectives for ICAO ASBU Monitoring
AOM21.1
Direct Rou�ng (Outside Applicability Area) Timescales: - not applicable -
0 Not Applicable
- Estonia is outside for the objec�ve applicability area. FRA is implemented. -
ASP (By:12/2017)
EANS 0% Not Applicable
FRA is implemented. - -
ATC02.2
Implement ground based safety nets - Short Term Conflict Alert (STCA) - level 2 for en-route opera�ons Timescales: Ini�al opera�onal capability: 01/01/2008 Full opera�onal capability: 31/01/2013
100 Completed
- STCA Level II func�on was implemented in 2012 and safety assessment was performed. Safety oversight was conducted on �me.
31/12/2012
ASP (By:01/2013) EANS 100% Completed The EUROCAT 2000 System has STCA implemented and opera�onal (Ini�al Opera�onal Capability). The STCA Level 2 was implemented and opera�onal since 2002. FOC was implemented in March 2012.
- 31/12/2012
ATC02.9
Short Term Conflict Alert (STCA) for TMAs Timescales: Ini�al opera�onal capability: 01/01/2018 Full opera�onal capability: 31/12/2020
100 Completed
- STCA func�on is implemented. 31/12/2012
ASP (By:12/2020) EANS 100% Completed STCA func�on is implemented. - 31/12/2012
ATC16
Implement ACAS II compliant with TCAS II change 7.1 Timescales: Ini�al opera�onal capability: 01/03/2012 Full opera�onal capability: 31/12/2015
100 Completed
- ACAS II compliant with TCAS II change 7.1 is implemented on �me. 04/01/2019
REG (By:12/2015) Estonian Transport Administra�on 100% Completed ECAA has supervised compliance with regulatory provisions for ACAS II (TCAS II version 7.1). - 31/12/2015
ASP (By:03/2012) EANS 100% Completed The ATC staff was trained in December 2015. - 31/12/2015
MIL (By:12/2015) Estonian Air Force (MIL) 100% Completed Estonian Air Force M-28 transport-type aircra� are TCAS II 7.1 equipped. - 04/01/2019
LSSIP Year 2023 Estonia 65 Working Level Agreed
COM10.1
Migrate from AFTN to AMHS (Basic service) Timescales: Ini�al Opera�onal Capability: 01/12/2011 Full Opera�onal Capability: 31/12/2018
100 Completed
- Exis�ng COM centres are upgraded to provide AMHS capability or implement EATMP Communica�ons Gateway (ECG). 31/12/2018
ASP (By:12/2018) EANS 100% Completed The migra�on took place in August 2016. - 31/12/2018
FCM01
Implement enhanced tac�cal flow management services Timescales: Ini�al opera�onal capability: 01/08/2001 Full opera�onal capability: 31/12/2006
100 Completed
- Since May 2008, Estonia is in the IFPS zone. Currently only the FMP is connected to NM. During the major system upgrade, all the requirements were implemented in 2012. FSA, CPR format tuning and tes�ng completed. NM/ETFMS supplies with flight plan related updates that are only available shortly before departure.
30/06/2015
ASP (By:07/2014) EANS 100% Completed All necessary func�onali�es are installed during system upgrade. Tuning, tes�ng and LoA revision completed. - 30/06/2015
ITY-COTR
Implementa�on of ground-ground automated co- ordina�on processes Timescales: Entry into force of Regula�on: 27/07/2006 For pu�ng into service of EATMN systems in respect of no�fica�on and ini�al coordina�on processes: 27/07/2006 For pu�ng into service of EATMN systems in respect of Revision of Coordina�on, Abroga�on of Coordina�on, Basic Flight Data and Change to Basic Flight Data: 01/01/2009 To all EATMN systems in opera�on by 12/2012: 31/12/2012
100 Completed
- Implementa�on of G-G automated co-ordina�on has been finalised within Eurocat 2000 upgrade project in 2012. 31/12/2012
ASP (By:12/2012) EANS 100% Completed OLDI basic messages exchange is implemented. Other ground-ground automated coordina�on processes and the training of ATC personnel have been performed.
- 31/12/2012
MIL (By:12/2012)
Estonian Air Force (MIL) 0% Not Applicable
OLDI not required as EAF currently provides only ADI service. Other ground- ground automated coordina�on is planned. - -
LSSIP Year 2023 Estonia 66 Working Level Agreed
Local Objectives
Note: Local Objectives are addressing solutions that are considered beneficial for specific operating environments, therefore for which a clear widespread commitment has not been expressed yet. They are characterised with no deadline and voluntary applicability area.
AOP14.1 Remote Tower Services Applicability and timescale: Local 40 Ongoing
EETN - Tallinn Airport EANS (not EETN AD) runs rTWR implementa�on project. - The Remote Tower Center is in Tallinn, in EANS headquarters. Two airports' (Kuressaare and Tartu) remote tower installa�ons are ready, governing body Estonian Transporta�on Administra�on has issued aeronau�cal equipment cer�ficate separately for both installa�ons. Remote tower for Tartu aerodrome went fully opera�onal in April 2023, since then the service has been provided only from the remote tower center in Tallinn. Service valida�on ac�vi�es for Kuressaare aerodrome's remote tower started in November 2023. Kuressaare remote tower is expected to be opera�onal in March 2024. - Future: The Remote Tower Centre is planned for all four Estonian regional aerodromes (Tartu, Kuressaare, Kärdla and Pärnu (not planned for EETN AD)). - For daily service provision.
31/03/2024
REG (By:) Estonian Transport Administra�on Ongoing EANS (not EETN AD) runs rTWR implementa�on project. - The Remote Tower Center is in Tallinn, in EANS headquarters. Two airports' (Kuressaare and Tartu) remote tower installa�ons are ready, governing body Estonian Transporta�on Administra�on has issued aeronau�cal equipment cer�ficate separately for both installa�ons. Remote tower for Tartu aerodrome went fully opera�onal in April 2023, since then the service has been provided only from the remote tower center in Tallinn. Service valida�on ac�vi�es for Kuressaare aerodrome's remote tower (rAFIS) started in November 2023. Kuressaare remote tower is expected to be opera�onal in March 2024. - Future: The Remote Tower Centre is planned for all four Estonian regional aerodromes (Tartu, Kuressaare, Kärdla and Pärnu (not planned for EETN AD)). - For daily service provision.
- 31/03/2024
ASP (By:) EANS Ongoing EANS (not EETN AD) runs rTWR implementa�on project. - The Remote Tower Center is in Tallinn, in EANS headquarters. Two airports' (Kuressaare and Tartu) remote tower installa�ons are ready, governing body Estonian Transporta�on Administra�on has issued aeronau�cal equipment cer�ficate separately for both installa�ons. Remote tower for Tartu aerodrome went fully opera�onal in April 2023, since then the service has been provided only from the remote tower center in Tallinn. Service valida�on ac�vi�es for Kuressaare aerodrome's remote tower were star�ng in November 2023. Kuressaare remote tower is expected to be opera�onal in March 2024. - The Remote Tower Centre is planned for all four Estonian regional aerodromes – Tartu, Kuressaare, Kärdla and Pärnu (not planned for EETN AD). - For daily service provision.
- 31/03/2024
APO (By:) TALLINN AIRPORT Ltd. Ongoing
LSSIP Year 2023 Estonia 67 Working Level Agreed
AOP14.1 Remote Tower Services Applicability and timescale: Local 40 Ongoing
EANS (not EETN AD) runs rTWR implementa�on project. Project is connected to Tallinn Airports Ltd-s ac�vi�es, since all regional airports are under Tallinn Airport Ltd.
- 31/03/2024
AOP15
Enhanced traffic situa�onal awareness and airport safety nets for the vehicle drivers Applicability and timescale: Local
0 Not Applicable
- Not planned. -
REG (By:04/2019)
Estonian Transport Administra�on Not Applicable
Not planned. - - APO (By:)
TALLINN AIRPORT Ltd. Not Applicable
Not planned. - -
AOP16 Guidance assistance through airfield ground ligh�ng Applicability and timescale: Local
0 Not Applicable
- Not planned. -
ASP (By:)
EANS Not Applicable
Not planned. - - APO (By:)
TALLINN AIRPORT Ltd. Not Applicable
Not planned. - -
AOP17
Provision/integra�on of departure planning informa�on to NMOC Applicability and timescale: Local
0 Not Applicable
- NA for State. EANS and Tallinn airport postponed the implementa�on of A-CDM at Tallinn aerodrome. A-CDM should be implemented in the frame of project Airport 4.0 and implementa�on probably not earlier than 31.12.2030.
-
ASP (By:)
EANS Not Applicable
EANS and Tallinn airport postponed the implementa�on of A-CDM at Tallinn aerodrome. A-CDM should be implemented in the frame of project Airport 4.0 and implementa�on probably not earlier than 31.12.2030.
- -
AOP18 Runway Status Lights (RWSL) Applicability and timescale: Local
0 Not Applicable
- Traffic density does not jus�fy the implementa�on of the Objec�ve and we`ll keep status N/A. -
REG (By:)
LSSIP Year 2023 Estonia 68 Working Level Agreed
AOP18 Runway Status Lights (RWSL) Applicability and timescale: Local
0 Not Applicable
Estonian Transport Administra�on Not Applicable
Traffic density does not jus�fy the implementa�on of the Objec�ve. - - ASP (By:)
EANS Not Applicable
Traffic density does not jus�fy the implementa�on of the Objec�ve. - - APO (By:)
TALLINN AIRPORT Ltd. Not Applicable
Traffic density does not jus�fy the implementa�on of the Objec�ve. - -
AOP21
Wake Turbulence Separa�ons for Arrivals based on Sta�c Aircra� Characteris�cs (S-PWS-A) Applicability and timescale: Local
0 Not Applicable
- No opera�onal need at the moment. -
ASP (By:)
EANS Not Applicable
No opera�onal needs at the moment. - -
AOP23 Integrated runway sequence for full traffic op�miza�on on single and mul�ple runway airports Applicability and timescale: Local
0 Not yet planned
EETN - Tallinn Airport N/A for EETN AD, Tallinn Airport is not listed in CP1 Geographical Scope. AD has not planned it (yet). -
ASP (By:)
EANS Not yet planned
Depends on Tallinn airport plans. - - APO (By:)
TALLINN AIRPORT Ltd. Not yet planned
Not yet planned. - -
AOP25 De-icing management tool Applicability and timescale: Local 0 Not yet
planned
EETN - Tallinn Airport Development according to SP-s ac�vi�es. -
ASP (By:)
EANS Not yet planned
Further plans depend on EETN airport. - - APO (By:)
TALLINN AIRPORT Ltd. Not yet planned
Not yet planned. - -
LSSIP Year 2023 Estonia 69 Working Level Agreed
AOP26
Reduced separa�on based on local Runway Occupancy Time (ROT) characterisa�on Applicability and timescale: Local
0 Not Applicable
- N/A, not planned either. -
ASP (By:)
EANS Not Applicable
Local objec�ve, not planned. - -
ATC18 Mul�-Sector Planning En-route - 1P2T Applicability and timescale: Local 0 Not
Applicable
- N/A, but objec�ve might come into the plans, in case FINEST realizes. -
ASP (By:01/2030)
EANS Not Applicable
N/A - -
ATC20 Enhanced STCA with down-linked parameters via Mode S EHS Applicability and timescale: Local
0 Not Applicable
- Estonia is outside of applicability area. SFL via Mode-S EHS is implemented. No need for enhancement of STCA with selected flight level is iden�fied.
-
REG (By:01/2030)
Estonian Transport Administra�on Not Applicable
Estonia is outside of applicability area. - - ASP (By:01/2030)
EANS Not Applicable
SFL via Mode S EHS is implemented. No need for enhancement of STCA with selected flight level is iden�fied. - -
ATC26 Point Merge in complex TMA Applicability and timescale: Local 0 Not
Applicable
EETN - Tallinn Airport Not planned. -
ASP (By:)
EANS Not Applicable
No plans to implement. - -
COM13 Air Traffic Services (ATS) datalink using SatCom Class B Applicability and timescale: Local 0 Not yet
planned
- Subject to local need, It has not yet been decided whether ANSP will par�cipate in the test phase. -
REG (By:)
Estonian Transport Administra�on Not Applicable
LSSIP Year 2023 Estonia 70 Working Level Agreed
COM13 Air Traffic Services (ATS) datalink using SatCom Class B Applicability and timescale: Local 0 Not yet
planned
N/A, and it has not yet been decided whether ANSP will par�cipate in the test phase. - -
ASP (By:)
EANS Not yet planned
NYP, lack of resources at the moment. - -
ENV02 Airport Collabora�ve Environmental Management Applicability and timescale: Local 100 Completed
EETN - Tallinn Airport Tallinn Airport has implemented Collabora�ve Environmental Management (CEM). 31/12/2016
ASP (By:) EANS Completed Completed - 31/12/2016
APO (By:) TALLINN AIRPORT Ltd. Completed Completed - 31/12/2016
ENV03 Con�nuous Climb Opera�ons (CCO) Applicability and timescale: Local 0 Not
Applicable
EETN - Tallinn Airport Not applicable at State level. Nevertheless, EETN AD has got the noise abatement procedures, what are applicable below the al�tude of 3000 � AMSL. REF EST AIP EETN AD 2.21.
-
ASP (By:)
EANS Not Applicable
Not applicable at State level. - - APO (By:)
TALLINN AIRPORT Ltd. Not Applicable
Not applicable at State level. - -
NAV11.1
Implement precision approach procedures using GBAS CAT II based on GAST C Applicability and timescale: Local
0 Not Applicable
- Subject to local need, not planned. -
REG (By:)
Estonian Transport Administra�on Not Applicable
ANSP has no plans to implement. - - ASP (By:)
EANS Not Applicable
EANS has no plans to implement precision approach procedures using GBAS CAT II based on GAST C. Considering the traffic capacity, it is not reasonable. - -
LSSIP Year 2023 Estonia 71 Working Level Agreed
SAF10.1 Implement measures to reduce the risk to aircra� opera�ons caused by airspace infringements Applicability and timescale: Local
30 Ongoing
- Ac�vity ongoing. 31/12/2030
REG (By:) Estonian Transport Administra�on Ongoing NIL - 31/12/2030
ASP (By:) EANS Ongoing According to EAPAIRR ques�onnaire, some of the parts of the European Ac�on Plan for Airspace Infringement Risk Reduc�on, are completed, some are ongoing and not yet planned.
- 31/12/2030
AIS (By:) EANS Ongoing Improving availability and access of VFR en-route charts ongoing, planned to analyse GPS moving maps on portable devices. AIM1 in SAF EAPAIRR ques�onnaire ongoing.
- 31/12/2025
SAF11.1 Improve Runway Safety by Preven�ng Runway Excursions Applicability and timescale: Local 100 Completed
- Since not all the ac�vi�es are reasonable to implement and some are constantly ongoing (others completed), we have considered this area Completed. 31/12/2023
REG (By:) Estonian Transport Administra�on Completed Some ASP_EANS ac�vi�es are constantly ongoing, others are completed. It has decided not to plan Approach Path Management (depending on the future traffic types/amount- thus plans might change).
- -
ASP (By:) EANS Completed GAPPRE Recommenda�ons ANSP3 and ANSP6 are constantly ongoing as they are part of the safety everyday work in ANSP. Other Recommenda�ons for ANSP completed.
- -
APO (By:) TALLINN AIRPORT Ltd. Completed Relevant/selected safety recommenda�ons from the Global Ac�on Plan for the Preven�on of Runway Excursions for their relevance against the local condi�ons and specific context have been assessed and implemented. Approach Path Management is not planned.
- 31/12/2023
LSSIP Year 2023 Estonia 72 Working Level Agreed
Annex A: Specialists involved in the ATM implementa�on repor�ng for Estonia
LSSIP Focal Points Organisa�on Name
LSSIP Na�onal Focal Point Estonian Transport Administra�on
Moonika KÄST
LSSIP Focal Point for NSA Estonian Transport Administra�on
Moonika KÄST
LSSIP Focal Point for ANSP Estonian ANS Kei� MERIKÜLL
LSSIP Focal Point for Airport Tallinn Airport Ilona SOITU
LSSIP Focal Point for Military Estonian Defence Forces Air Force
David-Andreas MELLOV
LSSIP Focal point for MET Estonian Environment Agency Jüri JOONAS
Other Focal Points Organisa�on Name
Focal Point for NETSYS EANS (Estonian ANS) Brenda ROOSIMAA
Focal Point for SUR EANS (Estonian ANS) Steve SÕERUER
Focal Point for SDP/CP1 EANS (Estonian ANS) Kei� MERIKÜLL
Focal Point for U-space Estonian Transport Administra�on
Priit RIFK
LSSIP Year 2023 Estonia 73 Working Level Agreed
Annex B: Ques�onnaires
1. Surveillance (SUR) Ques�onnaire This Annex is not published in the LSSIP Document, but is available in the LSSIP Tool, which can be made available upon request to Focal Point and/or Contact Person.
LSSIP Year 2023 Estonia 74 Working Level Agreed
2. EAPAIRR and GAPPRE Ques�onnaire
European Action Plan for Airspace Infringement Risk Reduction
This Annex is not published in the LSSIP Document, but is available in the LSSIP Tool, which can be made available upon request to Focal Point and/or Contact Person.
LSSIP Year 2023 Estonia 75 Working Level Agreed
3. SESAR Solu�ons implemented in a voluntary way3
This Annex is not published in the LSSIP Document, but is available in the LSSIP Tool, which can be made available upon request to Focal Point and/or Contact Person.
3 Referred as ‘Non-committed’ SESAR solutions in the MP L3 Report.
LSSIP Year 2023 Estonia 76 Working Level Agreed
Annex C: Implementa�on Objec�ves’ links with other plans
The table below (extracted from the MPL3 Plan 2023) shows for each implementation objective, the mapping of the L3 implementation Objectives to the corresponding SESAR Essential Operational Changes, the SESAR Solutions, the Deployment Program families, the ICAO ASBU, the EASA EPAS, the Network Strategy Plan, the Airspace Architecture Study Transition Plan (AAS TP) Milestones and the SESAR Key Features.
Level 3
Implementation Objective
SESAR Solution
SDP Family
OI Steps/ Enablers
ICAO ASBUs EPAS NSP AAS TP KF
ATC21 – Composite surveillance ADS- B/WAM
#114 -
CTE-S06, CTE-S05,
CTE-S03a, CTE-S03b, CTE-S04a
ASUR- B0/1
ASUR- B0/2
RMT.067 9
RMT.051 9
SO8/3 SO8/4 AM-1.17 EAI
COM10.2 – Extended AMHS - - CTE-C06c COMI-
B0/7 - SO7/4 - EAI
COM11.1 – Voice over Internet Protocol (VoIP) in En-Route
- - CTE-C05a CTE‐C05b
COMI- B2/1 - SO8/4 AM-1.3 EAI
COM11.2 – Voice over Internet Protocol (VoIP) in Airport/Terminal
- - CTE-C05a CTE‐C05b
COMI- B2/1 - SO8/4 - EAI
COM13 – Air Traffic Services (ATS) datalink using SatCom Class B
#109 - POI-0018- COM
COMI- B1/3 - - AM-1.16 EAI
ITY-ACID – Aircraft identification - - GSURV‐0101 - - SO8/2 - EAI
ITY-AGDL – Initial ATC air-ground data link services
- - AUO-0301
COMI- B0/4
COMI- B1/2
RMT.052 4
SO4/1 SO8/3 AM-1.1 EAI
ITY-AGVCS2 – 8.33 kHz Air-Ground Voice Channel Spacing below FL195
- - CTE-C01a - - SO8/1 - EAI
NAV10 – RNP Approach Procedures to instrument RWY
#103 -
AOM-0602 AOM-0604 CTE-N06a CTE-N06b
APTA- B0/1
APTA- B1/1
NAVS- B0/2
RMT.044 5
RMT.064 3
SO6/5 - AAT S
NAV11.2 – Implement precision approach procedures using GBAS CAT II/III based
#55 - AO-0505-A NAVS- B1/1
RMT.068 2 - - HPA
O
LSSIP Year 2023 Estonia 77 Working Level Agreed
Level 3
Implementation Objective
SESAR Solution
SDP Family
OI Steps/ Enablers
ICAO ASBUs EPAS NSP AAS TP KF
on GPS L1 and/or GALILEO E1
Level 3 Implementation
Objective
SESAR Solution
SDP Family
OI Steps/Enabler
s
ICAO ASBUs EPAS NSP AAS TP KF
AOM13.1 – Harmonise OAT and GAT handling
- - AOM-0301 AOM-0303 - - SO6/2 - OAN
S
AOP11.1 – Initial Airport Operations Plan
#21 2.2.1 AO-0801-A ACDM- B1/1 - SO6/2 - HPA
O
AOP11.2 – Extended Airport Operations Plan
#21 2.2.2
AO-0801-A, AO-0802-A, AO-0803, DCB-0310
ACDM- B1/1 - SO5/2 - HPA
O
AOP17 – Provision/integration of DPI to NMOC
#61 - DCB-0304 NOPS- B0/4 - - - HPA
O
COM12 – NewPENS - - CTE‐C06b COMI- B1/1 -
SO2/3, SO2/4, SO8/3, SO8/4
- EAI
FCM03 – Collaborative flight planning
- - IS-0102 NOPS- B0/2 - SO4/3 AM-1.14 OAN
S
FCM04.2 – Enhanced Short Term ATFCM Measures
#17 4.1.1 DCB-0308 NOPS- B1/1 - SO4/5 AM-1.11 OAN
S
FCM06.1 – Automated Support for Traffic Complexity Assessment and Flight Planning interfaces
#19 PJ.18-
02c 4.3.1
CM-0101 CM-0103-A
IS-0102
NOPS- B0/2
NOPS- B1/4
- SO4/3 SO4/5 AM-1.13 OAN
S
FCM10 – Interactive rolling NOP
#18 #20 4.2.1 DCB-0102
DCB-0208
NOPS- B1/2
NOPS- B1/9
- SO2/2, SO4/2, SO4/5
AM-1.9 AM-1.12
OAN S
FCM11.1 – Initial AOP/NOP Information Sharing
#20 #21 4.2.2 DCB-0103-A
AO-0801-A NOPS- B0/4 -
SO4/4, SO4/5, SO5/2
AM-1.12 OAN S
LSSIP Year 2023 Estonia 78 Working Level Agreed
Level 3 Implementation
Objective
SESAR Solution
SDP Family
OI Steps/Enabler
s
ICAO ASBUs EPAS NSP AAS TP KF
FCM11.2 – AOP/NOP integration
#18 #20 #21
4.4.1
AO-0801–A, AO-0802–A,
AO-0803, DCB-0310,
DCB-0103-A, DCB-0208
NOPS- B1/3 -
SO4/4, SO4/5, SO5/2
AM-1.12 OAN S
INF10.2 – Stakeholders’ SWIM PKI and cyber security
#46 5.2.1 IS-0901-A SWIM- B2/3
RMT.072 0 SO2/4 AM-1.5 EAI
INF10.3 – Aeronautical Information Exchange - Airspace structure service
#46 5.3.1 IS-0901-A - - SO2/4 AM-1.5 EAI
INF10.4 – Aeronautical Information Exchange - Airspace availability service
#46 5.3.1 IS-0901-A - - SO2/4 AM-1.5 EAI
INF10.5 – Aeronautical Information Exchange - Airspace Reservation (ARES) service
#46 5.3.1 IS-0901-A - - SO2/4 AM-1.5 EAI
INF10.6 – Aeronautical Information Exchange - Digital NOTAM service
#34 #46 5.3.1 IS-0901-A
IS-0205 - - SO2/4 AM-1.5 EAI
INF10.7 – Aeronautical Information Exchange - Aerodrome Mapping information exchange service
#34 #46 5.3.1 IS-0901-A
IS-0205 - - SO2/4 AM-1.5 EAI
INF10.8 – Aeronautical Information Exchange - Aeronautical Information Features service
#34 #46 5.3.1 IS-0901-A
IS-0205 - - SO2/4 AM-1.5 EAI
INF10.9 – Meteorological Information Exchange - Volcanic ash concentration service
#34 #35 #46
5.4.1 IS-0901-A IS-0205
MET-0101 - - SO2/4 AM-1.5 EAI
LSSIP Year 2023 Estonia 79 Working Level Agreed
Level 3 Implementation
Objective
SESAR Solution
SDP Family
OI Steps/Enabler
s
ICAO ASBUs EPAS NSP AAS TP KF
INF10.10 – Meteorological Information Exchange - Aerodrome Meteorological information Service
#34 #35 #46
5.4.1 IS-0901-A IS-0205
MET-0101 - - SO2/4 AM-1.5 EAI
INF10.11 – Meteorological Information Exchange - En-Route and Approach Meteorological information service
#34 #35 #46
5.4.1 IS-0901-A IS-0205
MET-0101 - - SO2/4 AM-1.5 EAI
INF10.12 – Meteorological Information Exchange - Network Manager Meteorological Information
#34 #35 #46
5.4.1 IS-0901-A IS-0205
MET-0101 - - SO2/4 AM-1.5 EAI
INF10.13 – Cooperative Network Information Exchange - ATFCM Tactical Updates Service
#46 5.5.1 IS-0901-A - - SO2/4 AM-1.5 EAI
INF10.14 – Cooperative Network Information Exchange - Flight Management Service
#46 5.5.1 IS-0901-A - - SO2/4 SO5/2 AM-1.5 EAI
INF10.15 – Cooperative Network Information Exchange - Measures Service
#46 5.5.1 IS-0901-A - - SO2/4 SO4/5 AM-1.5 EAI
INF10.16 – Cooperative Network Information Exchange - Short Term ATFCM Measures services
#46 5.5.1 IS-0901-A - - SO2/4 SO4/5 AM-1.5 EAI
INF10.17 – Cooperative Network Information Exchange - Counts service
#46 5.5.1 IS-0901-A - - SO2/4 AM-1.5 EAI
INF10.18 – Flight Information Exchange -Filing Service
#46 5.6.1 AUO-0207 FICE- B2/2 - SO2/4 AM-1.5 EAI
INF10.19 – Flight Information Exchange #46 5.6.1 AUO-0207 FICE-
B2/4 - SO2/4 AM-1.5 EAI
LSSIP Year 2023 Estonia 80 Working Level Agreed
Level 3 Implementation
Objective
SESAR Solution
SDP Family
OI Steps/Enabler
s
ICAO ASBUs EPAS NSP AAS TP KF
- Flight Data Request Service
INF10.20 – Flight Information Exchange - Notification Service
#46 5.6.1 AUO-0207 FICE- B2/5 - SO2/4 AM-1.5 EAI
INF10.21 – Flight Information Exchange - Publication Service
#46 5.6.1 AUO-0207 FICE- B2/6 - SO2/4 AM-1.5 EAI
INF10.22 – Flight Information Exchange - Trial Service
#46 5.6.1 AUO-0219 FICE- B2/3 - SO2/4 AM-1.5 EAI
INF10.23 – Flight Information Exchange - Extended AMAN SWIM Service
#46 5.6.1 AUO-0207
DAIM- B2/1
SWIM- B3/1
- SO2/4 AM-1.5 EAI
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
INF07 – Electronic Terrain and Obstacle Data (e-TOD)
- - AIMS-16
DAIM- B1/3
DAIM- B1/4
RMT.070 3
RMT.072 2
SO2/5 - EAI
INF11.1 – Enhanced Ground Weather Management System (GWMS) as local 4DWxCube
PJ.18- 04b-01 - POI-0044-
MET - - - - EAI
INF11.2 – Cb-global capability and service
PJ.18- 04b-02 - POI-0048-
MET - - - - EAI
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
AOP04.1 – A-SMGCS Surveillance Service (former ICAO Level 1)
#70 #110 -
AO-0201 AO-0201-A POI-0071-
SUR
SURF- B0/2
MST.002 9 SO6/6 - HPA
O
LSSIP Year 2023 Estonia 81 Working Level Agreed
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
AOP04.2 – A-SMGCS RMCA (former ICAO Level 2)
- - AO-0102 SURF- B0/3
MST.002 9 SO6/6 - HPA
O
AOP05 – Airport CDM - -
AO-0501, AO-0601, AO-0602, AO-0603, TS-0201
ACDM- B0/1
ACDM- B0/2
NOPS- B0/4
- SO6/4 - HPA O
AOP10 – Time Based Separation #64 - AO-0303 WAKE-
B2/7 - SO6/5 - HPA O
AOP12.1 – Airport Safety Nets #02 2.3.1 AO-0104-A SURF-
B1/3 MST.002
9 SP6/6 - HPA O
AOP13 – Automated assistance to Controller for Surface Movement planning and routing
#22 #53 - AO-0205
TS-0202 SURF- B1/4
MST.002 9 SO6/6 - HPA
O
AOP15 – Safety Nets for vehicle drivers #04 - AO-0105
AO-0204 SURF- B2/2
MST.002 9 - - HPA
O
AOP16 – Guidance assistance through airfield lighting
#47 - AO-0222-A SURF- B1/1
MST.002 9 - - HPA
O
AOP18 – Runway Status Lights #01 - AO-0209
SURF- B2/2, SURF- B2/3-
MST.002 9 - - HPA
O
AOP19 – Departure Management Synchronised with Pre-departure sequencing
#53 #106 2.1.1 AO-0602
TS-0201 RSEQ- B0/2 - - - HPA
O
AOP20 – Wake Turbulence Separations for Departures based on Static Aircraft Characteristics (S- PWS-D)
PJ.02-01- 06 - AO-0323 - RMT.047
6 - - HPA O
AOP21 – Wake Turbulence Separations for Arrivals based on Static Aircraft Characteristics (S- PWS-A)
PJ.02-01- 04 - AO-0306 WAKE-
B3/3 RMT.047
6 - - HPA O
LSSIP Year 2023 Estonia 82 Working Level Agreed
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
AOP22 – Minimum pair separations based on SRP
PJ.02-03 - AO-0309 - - - - HPA O
AOP23 – Integrated runway sequence for full traffic optimization on single and multiple runway airports
PJ.02-08- 01 - TS-0301 RSEQ-
B2/1 - - - HPA O
AOP24 – Optimised use of runway configuration for multiple runway airports
PJ.02-08- 02 - TS-0313 - - - - HPA
O
AOP25 – De-icing Management Tool #116 - POI-0070-
AO - - - - HPA O
AOP26 – Reduced separation based on local Runway Occupancy Time (ROT) characterisation
PJ.02-08- 03 - AO-0337 - - - - HPA
O
ATC07.1 – Arrival management tools - - TS-0102 RSEQ-
B0/1 - SO4/1 - AAT S
ATC19 – Enhanced AMAN-DMAN integration
#54 1.2.1 TS-0308 RSEQ- B2/1 - SO6/5
SO4/1 - EAI
ATC26 – Point Merge in complex TMA #107 - AOM-0601 RSEQ-
B0/3 - - - AAT S
ENV01 – Continuous Descent Operations #11 -
AOM-0701 AOM-0702-
A
APTA- B0/4
APTA- B1/4
- SO6/5 - AAT S
ENV02 – Airport Collaborative Environmental Management
- - AO-0703, AO-0705, AO-0706
- - - - HPA O
ENV03 – Continuous Climb Operations - - AOM-0703
APTA- B0/5
APTA- B1/5
- SO6/5 - AAT S
NAV03.1 – RNAV1 in TMA Operations #62 - AOM-0601
CTE-N08 APTA- B0/2
RMT.044 5 SO6/5 - AAT
S
NAV03.2 – RNP1 in TMA Operations #09 - AOM-0603
AOM-0605 APTA- B1/2
RMT.044 5 SO6/5 - AAT
S
LSSIP Year 2023 Estonia 83 Working Level Agreed
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
#51 PJ.14-03-
04
POI-0032- NAV
NAV11.1 – GLS CAT II operations using GBAS GAST-C
#119 - AO-0506 NAVS- B1/1
RMT.068 2
RMT.379 - - HPA
O
SAF11.1 – Improve runway safety by preventing runway excursions
- - - - - - - HPA O
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
AOM19.4 – Management of Pre- defined Airspace Configurations
#31 #66 3.1.2
AOM-0202- A
AOM-0206- A
CM-0102-A
FRTO- B1/4, NOPS- B1/6
- SO3/2 SO3/3
AM-1.10 AM-1.8-
OAN S
AOM19.5 – ASM and A-FUA
#31 #66 3.1.1
AOM-0202 AOM-0202-
A AOM-0206-
A
NOPS B1/5, NOPS B0/1, FRTO B1/3, FRTO B0/2
- SO3/2 SO3/3
AM-1.10 AM-1.8
OAN S
AOM21.2 – Initial Free Route Airspace
#32 #33 #66
3.2.1 AOM-0501 AOM-0505 CM-0102-A
FRTO- B1/1 - SO3/1
SO3/4 AM-1.10 AM-5.1
AAT S
AOM21.3 – Enhanced Free Route Airspace Operations
#33 PJ.06-01 3.2.2 AOM-0501
AOM-0505 FRTO- B2/3 - SO3/1
SO3/4 AM-1.6 AM-1.7
AAT S
ATC12.1 – MONA, TCT and MTCD
#27 #104 -
CM-0202, CM-0203, CM-0205,
CM-0207-A
FRTO- B0/4
FRTO- B1/5
- SO3/1 SO4/1
AM-1.15 AM-5.1
AAT S
ATC15.1 – Initial Extension of AMAN to En-route
- - TS-0305 - - SO4/1 - AAT S
ATC15.2 – Arrival Management #05 1.1.1 TS-0305-A RSEQ-
B1/1 - SO4/1 AM-1.3 AAT S
LSSIP Year 2023 Estonia 84 Working Level Agreed
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
Extended to En-route Airspace
NOPS- B1/8
ATC18 – Multi Sector Planning En-route – 1P2T
#63 #118
- CM-0301 FRTO-
B1/6 - SO4/1 AM-4.3 AM-5.1
AAT S
ITY-FMTP – Apply a common flight message transfer protocol (FMTP)
- - CTE-C06 - - SO8/3 AM-1.3 EAI
SAF10.1 – Implement measures to reduce the risk to aircraft operations caused by airspace infringements
- - - - SI.2025 - - AAT S
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
ATC02.8 – Ground based safety nets - - CM-0801
SNET- B0/2 SNET- B0/3 SNET- B0/4
- SO4/1 - AAT S
ATC20 – Enhanced STCA with DAP via Mode S EHS
#69 - CM-0807-A SNET- B1/1
MST.003 0 SO7/2 - AAT
S
ATC22 – Initial Air- Ground Trajectory Information Sharing (Airborne Domain)
#115 6.1.1 IS-0303-A - RMT.068 2 SO4/5 AM-1.2 EAI
ATC23 – Initial Air- Ground Trajectory Information Sharing (Ground Domain)
#115 PJ.18- 06b1
6.1.2 IS-0303-A - RMT.068 2 SO4/5 AM-1.2 EAI
ATC24 – Network Manager Trajectory Information Enhancement
PJ.18- 06b1 6.2.1 POI-0011-IS
POI-0013-IS - RMT.068 2 SO4/5 - EAI
ATC25 – Initial Trajectory #115 6.3.1 IS-0303-A - MST.003
1 AM-1.2 EAI
LSSIP Year 2023 Estonia 85 Working Level Agreed
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
Information Sharing ground distribution
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
NAV12 – ATS IFR Routes for Rotorcraft Operations
#113 - AOM-0810 APTA- B0/6
MST.003 1 SO6/5 - AAT
S
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
- - - - - - - - -
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
AOP14.1 – Remote Tower Services
#12 #13 #52 #71 -
SDM-0201 SDM-0204 SDM-0205
RATS- B1/1
RMT.062 4 SO6/5 - HPA
O
AOP14.2 – Multiple Remote Tower Module
PJ.05-02 - SDM-0207 RATS- B1/1
RMT.062 4 SO6/5 - HPA
O
LSSIP Year 2023 Estonia 86 Working Level Agreed
Annex D: Na�onal stakeholders organisa�on charts
Structure of Estonian Transport Administration
LSSIP Year 2023 Estonia 87 Working Level Agreed
Structure of EANS
LSSIP Year 2023 Estonia 88 Working Level Agreed
Structure of AS Tallinna Lennujaam
LSSIP Year 2023 Estonia 89 Working Level Agreed
Structure of MET
LSSIP Year 2023 Estonia 90 Working Level Agreed
Structure of MIL
LSSIP Year 2023 Estonia 91 Working Level Agreed
Annex E: Glossary of Terms
This Annex mainly shows the abbreviations that are specific to the LSSIP Document for Estonia.
Other general abbreviations are in the Acronyms and Abbreviations document in:
https://www.eurocontrol.int/airial/
Term Description
AF ATM Functionality
EANS Estonian Air Navigation Services (Estonian ANS)
ESTEA Estonian Environment Agency
LOF Log-On Forwarding message
NAMCON The Northern Europe Aviation Meteorology Consortium
NAN Next Authority Notified message
NEFAB North European Functional Airspace Block
NEFRA North European Free Route Airspace
NSA National Supervisory Authority
rAFIS Remote AFIS
rTWR Remote TWR
LSSIP Year 2023 Estonia Working Level Agreed
LSSIP Year 2023 Estonia Working Level Agreed
Foreword
The EUROCONTROL Local Single Sky Implementa�on (LSSIP) is a long-standing process celebra�ng its 30th anniversary. Its main goal is to improve the overall streamlined planning process in avia�on and in ATM, allowing avia�on stakeholders to deploy the agreed set of technological and infrastructure evolu�ons in a �mely manner and put the new func�onali�es into opera�ons in an orchestrated way across Europe.
The usage of the common LSSIP+ tool to gather data from the ATM stakeholders is a very good showcase of our collec�ve efforts, EUROCONTROL and SDM, in advancing the European ATM Network in support of our opera�onal stakeholders, moving towards the single value chain.
The LSSIP process is con�nuously improving the planning and repor�ng accuracy and consistency. It ensures the regular monitoring of the implementa�on of all func�onali�es.
The opera�onal stakeholders are facing the challenges of traffic growth, capacity and constantly increasing sustainability requirements. The need to maintain a process and pla�orm for the European avia�on community which provides a visibility of their plans and progress within the agreed �meline is stronger than ever. The con�nuous engagement in the LSSIP process shows the commitment towards a robust unified planning and monitoring process of the European ATM modernisa�on.
The na�onal LSSIP documents not only provide a unified view of the plans and progress of implementa�on at both Na�onal and ECAC levels. They also form the core of the ICAO’s Avia�on System Block Upgrades (ASBUs) Implementa�on Monitoring Report within the ICAO EUR Region. Developed by EUROCONTROL on behalf of ICAO, it is based on the reported LSSIP data for all 55 ICAO/EUR States and informs at global level about the European progress of implementa�on of the Global Air Naviga�on Plan (GANP).
Moreover, star�ng this year, the EUR RASP ques�onnaire, a joint effort between the ICAO EUR Office and EASA, directly supported by EUROCONTROL, has been officially incorporated into the LSSIP mechanism, thereby enhancing the collabora�on between our organisa�ons.
I would like to thank all our stakeholders for their con�nued commitment and significant effort in contribu�ng to the LSSIP process, the produc�on of this LSSIP document and in suppor�ng EUROCONTROL towards our goal of diligently guiding and informing the Avia�on community on ATM deployment.
Enjoy reading! Iacopo Prissinotti Director NM - Network Manager EUROCONTROL
LSSIP Year 2023 Estonia Working Level Agreed
SESAR Deployment Manager Lookout
This document serves as a testament to our collec�ve efforts in advancing the European ATM Network, and a roadmap for the challenges that lie ahead. We can truly state that this is the result of ac�ng as one team for the modernisa�on of European avia�on.
The SESAR Deployment Programme progress informa�on, collected through the LSSIP+ tool, via the unified monitoring and repor�ng process is a cornerstone of this document and at the same �me directly supports the delivery of the SESAR Deployment Programme Monitoring View 2023.
This drives the re-direc�on of our work at SDM to guide and support the opera�onal stakeholders in their implementa�on efforts of CP1 to make sure the ATM industry is able to achieve the target goals. It gives SDM, since the first edi�on of the Monitoring View in 2015, the opportunity to iden�fy implementa�on risks and beter support stakeholders to accelerate deployment.
I would like to extend my gra�tude to all European organisa�ons involved and contribu�ng with data in LSSIP+ tool. As it is only through stakeholders' coopera�on, efforts and partnerships' spirit that we will keep pushing deployment forward within the European skies, avoiding delays in the adop�on of CP1 and building an ATM industry that can overcome the challenges of the upcoming years.
The two CP1 regulatory target deadlines already surpassed, and the approaching ones, underscore the urgency of our mission to beter support stakeholders to accelerate deployment. The significant progress achieved in the status of its implementa�on is living proof for the joint effort of ATM stakeholders throughout Europe.
Those deadlines serve as a reminder that our work is not just about mee�ng regulatory requirements, but about shaping the future of avia�on in Europe. Every objec�ve we complete, every milestone we achieve, brings us one step closer to that future.
As you dive into this document and SDP Monitoring View 2023, we hope it provides you with a clear understanding of our common journey so far and the path that lies ahead. We look forward to naviga�ng these challenges together, driven by our shared commitment to a safer, more efficient, and sustainable European sky. Mariagrazia La Piscopia Chief Strategy and Programme SESAR Deployment Manager
LSSIP Year 2023 Estonia Working Level Agreed
Document Title LSSIP Year 2023 for Estonia
Info Centre Reference <XX> (LSSIP Support)
Date of Edi�on <Date>
LSSIP Focal Point Moonika Käst – moonika.kast@transpordiamet.ee Estonian Transport Administra�on
LSSIP Contact Person Luca Dell’Orto – luca.dellorto@eurocontrol.int EUROCONTROL/NMD/INF/PAS
LSSIP Support Team lssip.support@eurocontrol.int
Status Ini�al Dra�
Intended for EUROCONTROL Stakeholders
Available in htps://www.eurocontrol.int/service/local-single-sky-implementa�on- monitoring
Reference Documents
LSSIP Documents htps://www.eurocontrol.int/service/local-single-sky-implementa�on- monitoring
Master Plan Level 3 – Plan Edi�on 2023
htps://www.eurocontrol.int/publica�on/european-atm-master-plan- implementa�on-plan-level-3
Master Plan Level 3 – Report Year 2023
htps://www.eurocontrol.int/publica�on/european-atm-master-plan- implementa�on-report-level-3
European ATM Portal htps://www.atmmasterplan.eu/
STATFOR Forecasts htps://www.eurocontrol.int/sta�or
Na�onal AIP https://aim.eans.ee
LSSIP Year 2023 Estonia Working Level Agreed
Approval Sheet
The following authorities have approved all parts of the LSSIP Year 2023 document, and the signatures confirm the correctness of the reported information and reflect the commitment to implement the actions laid down in the European ATM Master Plan Level 3 (Implementation View) – Edition 2023.
Stakeholder / Organisation
Name Position Signature and date
Estonian Transport Administration
Üllar Salumäe Director of Aviation Division
Estonian Air Naviga�on Services
Ivar Värk Chairman of Management Board and CEO
Estonian Air Force Toomas Susi
Active Commander of the Estonian Air Force Brigadier General
AS Tallinna Lennujaam Riivo Tuvike Chairman of Management Board
Estonian Environment Agency
Taimar Ala Director General
Üllar Salumäe (Apr 11, 2024 10:53 GMT+3) Üllar Salumäe
Ivar Värk, CEO EANS (Apr 11, 2024 13:08 GMT+3)
Toomas Susi (Apr 11, 2024 14:29 GMT+3) Toomas Susi
Riivo Tuvike (Apr 15, 2024 16:31 GMT+3) Riivo Tuvike
Taimar Ala (Apr 15, 2024 16:44 GMT+3) Taimar Ala
LSSIP Year 2023 Estonia Working Level Agreed
Table of Contents
EXECUTIVE SUMMARY ........................................................................................................................................ 1
HIGH LEVEL STATS DASHBOARD ........................................................................................................................................ 1 TRAFFIC AND CAPACITY ................................................................................................................................................... 2 IMPLEMENTATION SUMMARY ........................................................................................................................................... 3
Summary of the implementation of the objectives ............................................................................................... 3 Other 2023 developments: .................................................................................................................................... 3
INTRODUCTION .................................................................................................................................................. 4
1 NATIONAL IMPLEMENTATION VIEW ............................................................................................................. 5
1.1 NATIONAL ATM SCOPE ...................................................................................................................................... 5 International Membership .................................................................................................................................... 5 Estonia is part of: .................................................................................................................................................. 5 Main National Stakeholders .................................................................................................................................. 6
1.2 IMPLEMENTATION VIEWS .................................................................................................................................... 7 Progress per SESAR Phase ..................................................................................................................................... 7 Progress per SESAR Essential Operational Changes and Phase............................................................................. 8 Objective Progress per SESAR Essential Operational Changes .............................................................................. 9 ICAO ASBU Implementation Progress – Blocks 0 and 1 ....................................................................................... 13 ICAO ASBU Implementation Progress .................................................................................................................. 14 Overall situation of Implementation Objectives .................................................................................................. 18
TRAFFIC AND CAPACITY .................................................................................................................................... 24
1.3 NATIONAL ATM STRUCTURE ............................................................................................................................. 24 Geographical description of the FIR(s) ................................................................................................................ 24 Airspace Classification and Organisation ............................................................................................................ 25
EVOLUTION OF TRAFFIC IN ESTONIA ................................................................................................................................ 26 TALLINN ACC.............................................................................................................................................................. 27
Traffic and en-route ATFM delays 2019-2029 ..................................................................................................... 27 2023 performance ............................................................................................................................................... 27 Planning Period – Summer 2024-2029 ................................................................................................................ 28
2 NATIONAL ATM ENVIRONMENT ................................................................................................................ 30
MAIN NATIONAL STAKEHOLDERS .................................................................................................................................... 30 Civil Regulator(s) ................................................................................................................................................. 30 Airports ................................................................................................................................................................ 33 Meteorological Service Providers ........................................................................................................................ 34 Military Authorities ............................................................................................................................................. 34
3 IMPLEMENTATION PROJECTS ..................................................................................................................... 38
3.1 NATIONAL PROJECTS ......................................................................................................................................... 38 3.2 FAB PROJECTS ................................................................................................................................................. 39 3.3 MULTINATIONAL PROJECTS ................................................................................................................................ 39
4 COOPERATION ACTIVITIES ......................................................................................................................... 40
4.1 FAB COORDINATION ........................................................................................................................................ 40 4.2 MULTINATIONAL COOPERATION INITIATIVES ......................................................................................................... 40
LSSIP Year 2023 Estonia Working Level Agreed
5 DETAILED OBJECTIVES IMPLEMENTATION PROGRESS ................................................................................. 42
Main Objectives ................................................................................................................................................... 42 Additional Objectives for ICAO ASBU Monitoring ............................................................................................... 64 Local Objectives ................................................................................................................................................... 66
ANNEX A: SPECIALISTS INVOLVED IN THE ATM IMPLEMENTATION REPORTING FOR ESTONIA ............................. 72
ANNEX B: QUESTIONNAIRES ............................................................................................................................. 73
1. SURVEILLANCE (SUR) QUESTIONNAIRE ..................................................................................................................... 73 2. EAPAIRR AND GAPPRE QUESTIONNAIRE ................................................................................................................. 74 3. SESAR SOLUTIONS IMPLEMENTED IN A VOLUNTARY WAY .............................................................................................. 75
ANNEX C: IMPLEMENTATION OBJECTIVES’ LINKS WITH OTHER PLANS ............................................................... 76
ANNEX D: NATIONAL STAKEHOLDERS ORGANISATION CHARTS ............................................................................. 86
ANNEX E: GLOSSARY OF TERMS ........................................................................................................................ 91
LSSIP Year 2023 Estonia 1 Working Level Agreed
Execu�ve Summary
High Level Stats dashboard
LSSIP Year 2023 Estonia 2 Working Level Agreed
Traffic and Capacity
Level of traffic compared to 2019.
Summer En-Route Delay Tallinn ACC
Forecast between 2024-2029
2022 2023 N/A
65%
2.7% 2024-2029
LSSIP Year 2023 Estonia 3 Working Level Agreed
Implementation Summary
Summary of the implementa�on of the objec�ves
The introduc�on of a new Voice Communica�on System was a major project, which was finalised by the first half of 2023 and contributed to the comple�on of Objec�ves COM11.1 and COM11.2.
The Objec�ve FCM04.2 Enhanced Short Term ATFCM Measures was fully completed.
All the SWIM related Objec�ves are planned or ongoing, but there are foreseen delays in implementa�on due to complex ATM systems. Nevertheless, in 2023 several AIS ac�vi�es were carried out, which contribute to the implementa�on of digital NOTAM Service. EANS is also par�cipa�ng in project ACADIA (Accelera�on of Aeronau�cal Digital Informa�on Availability) to ensure accordance.
ITY-ACID Aircra� Iden�fica�on is s�ll ongoing with an implementa�on date later than the FOC date due to a delay of neighbouring ANSP-s implementa�on plans.
The local Objec�ve AOP14.1 Remote Tower Services first stage was fully implemented and is envisaged to be completed for the next aerodrome (EEKE) by 2024.
Other 2023 developments:
- Installation of new meteorological systems at EEKA, EEKE, EETN and EETU AD is finished. Certification process is ongoing.
- Implementation of CAT II at Tallinn Airport is ongoing. - Changes in governmental system. Estonian Transport Administration and Environment
Agency moved into area of Ministry of Climate.
Implemen�ng progress of AOM13.1, INF07 has gone very slowly due to constant lack of human resources in Estonian Transport Administra�on.
LSSIP Year 2023 Estonia 4 Working Level Agreed
Introduc�on
The Local Single Sky ImPlementa�on (LSSIP) documents, as an integral part of the Master Plan (MP) Level 3 (L3)/LSSIP mechanism, cons�tute a short/medium term implementa�on plan containing ECAC+ States’ ac�ons to achieve the Implementa�on Objec�ves as set out by the MP Level 3 and to improve the performance of their na�onal ATM System. This LSSIP document describes the situa�on in the State at the end of December 2023, together with plans for the next years.
Chapter 1 provides an overview of the na�onal ATM scope within the State, which is relevant for the implementa�on ac�vi�es, as well as an overview of the planning ac�vi�es by providing different charts on the progress reported by the different stakeholders.
Chapter 2 provides a comprehensive picture of the situa�on of Air Traffic, Capacity and ATFM Delay per each ACC in the State. It shows the evolu�on of Air Traffic and Delay in the last five years and the forecast for the next five years. It also presents the achieved performance in terms of delay during the summer season period and the planned projects assumed to offer the required capacity which will match the foreseen traffic increase and keep the delay at the agreed performance level.
Chapter 3 provides an overview of the ATM ins�tu�onal arrangements within the State. Chapter 4 provides the main Implementa�on Projects which contribute directly to the implementa�on of the MP Opera�onal Improvements and/or Enablers and Implementa�on Objec�ves. The LSSIP document covers a high-level list of the projects showing the applicable links. All other details like descrip�on, �mescale, progress made and expected contribu�on to the ATM Key Performance Areas provided by the State per each project are available in the LSSIP DB (extrac�on can be asked to LSSIP FP or LSSIP CP).
Chapter 5 deals with other coopera�on ac�vi�es beyond Implementa�on Projects. It provides an overview of the FAB coopera�on, as well as all other mul�na�onal ini�a�ves, which are out of the FAB scope. The content of this chapter generally is developed and agreed in close coopera�on between the States concerned.
Chapter 6 provides the high-level informa�on on progress and plans of each Implementa�on Objec�ve. The informa�on for each Implementa�on Objec�ve is presented in boxes giving a summary of the progress and plans of implementa�on for each Stakeholder. The conven�ons used are presented at the beginning of the sec�on.
The information contained in Chapter 6 – Implementation Objectives Progress is deemed sufficient to satisfy State reporting requirements towards ICAO in relation to ASBU (Aviation System Block Upgrades) monitoring.
LSSIP Year 2023 Estonia 5 Working Level Agreed
1 Na�onal Implementa�on View
1.1 Na�onal ATM Scope
Interna�onal Membership
Estonia is a member of the following interna�onal organisa�ons in the field of ATM:
Organisa�on Since Organisa�on Since
2015
2004
1995
2004
1992
2004
2004
1992
1992
Estonia is part of: The North European Func�onal Airspace Block (NEFAB).
In 2023 the GDP decreased by 3,5%, the forecast for 2024 is about 0,4% of deficiency. Main airport covered by LSSIP: EETN AD.
Number of national projects: 4 Number of FAB projects: NIL Number of multinational projects: 3
LSSIP Year 2023 Estonia 6 Working Level Agreed
Main Na�onal Stakeholders
The main National Stakeholders involved in ATM in Estonia are the following:
- Ministry of Climate;
- Ministry of Economic Affairs and Communica�ons;
- Ministry of Defence;
- Estonian Transport Administration;
- Estonian Air Navigation Services (EANS);
- Estonian Environment Agency;
- Estonian Defence Forces Air Force;
- AS Tallinna Lennujaam.
Their activities are detailed in the following subchapters and their relationships are shown in the diagram below.
LSSIP Year 2023 Estonia 7 Working Level Agreed
1.2 Implementa�on Views
Progress per SESAR Phase
The figure below shows the progress made so far in the implementation of objectives stemming from different R&D phases (Pre-SESAR, SESAR1 and SESAR 2020).
It shows the average implementation progress for all objectives grouped by SESAR Phase, excluding those for which the State is outside the applicability area as defined on a yearly basis in the European ATM Master Plan (Level 3) 2023, i.e., disregarding the declared “NOT APPLICABLE” LSSIP progress status.
Source: EUROCONTROL LSSIP+ DB
LSSIP Year 2023 Estonia 8 Working Level Agreed
Progress per SESAR Essen�al Opera�onal Changes and Phase
The figure below shows the progress made so far, per SESAR Essential Operational Changes, in the implementation of the SESAR phases. The percentages are calculated as an average, per EOC, of the same objectives as in the previous paragraph.
Source: EUROCONTROL LSSIP+ DB
LSSIP Year 2023 Estonia 9 Working Level Agreed
Objec�ve Progress per SESAR Essen�al Opera�onal Changes
LSSIP Year 2023 Estonia 10 Working Level Agreed
No implementa�on objec�ves are available yet for this EOC.
LSSIP Year 2023 Estonia 11 Working Level Agreed
LSSIP Year 2023 Estonia 12 Working Level Agreed
No implementa�on objec�ves are available yet for this EOC. Source: EUROCONTROL LSSIP+ DB
LSSIP Year 2023 Estonia 13 Working Level Agreed
ICAO ASBU Implementa�on Progress – Blocks 0 and 1
The figure below shows the progress made so far in the implementation of the ICAO ASBU Blocks 0 and 1, according to ICAO Global Air Navigation Plan 7th Edition (2022). The overall percentage is calculated as an average of the relevant Objectives contributing to each of the relevant ASBU Blocks; this is a summary of the table explained on the next page – ICAO ASBU Implementation Progress.
Source: EUROCONTROL LSSIP+ DB
LSSIP Year 2023 Estonia 14 Working Level Agreed
ICAO ASBU Implementa�on Progress
The tables below show for each ASBU Elements belonging to a particular ASBU Thread and Block, the overall status, the final date foreseen for completion and the percentage of progress achieved in the current cycle.
The set of Block 0 and Block 1 ASBU elements to be monitored in ICAO EUR Region has been approved through written consultation by European Aviation System Planning Group (EASPG) in April 2021, based on the conclusions of the EUR Global Air Navigation Plan (GANP) Transition Project Team. The set of monitored Elements has been subsequently amended following the publication of the 7th version of the GANP, endorsed in October 2022.
Results below were determined using the LSSIP Year 2023 declared statuses and progress of the relevant Implementation objectives in accordance with the updated mapping.
Note: Only the ASBU elements that are linked to an active implementation Objective are shown
Source: EUROCONTROL LSSIP+ DB
LSSIP Year 2023 Estonia 15 Working Level Agreed
ATM Deployment Outlook
State Objec�ves
Deployed in 2023
- Interac�ve Rolling NOP
[FCM10] 100 % progress
- Improve Runway Safety by Preven�ng Runway Excursions
[SAF11.1] 100 % progress
- Collabora�ve Flight Planning
[FCM03] 100 % progress
- Voice over Internet Protocol (VoIP) in En-Route
[COM11.1] 100 % progress
- Voice over Internet Protocol (VoIP) in Airport/Terminal
[COM11.2] 100 % progress
- Enhanced Short Term ATFCM Measures
[FCM04.2] 100 % progress
- Automated Support for Traffic Complexity Assessment and Flight Planning interfaces
[FCM06.1] 100 % progress
By 2024
- Aeronau�cal Informa�on Exchange - Airspace Reserva�on (ARES)
[INF10.5] 3 % progress
- Harmonise Opera�onal Air Traffic (OAT) and General Air Traffic (GAT) Handling
[AOM13.1] 56 % progress
- Aircra� Iden�fica�on
[ITY-ACID] 92 % progress
Source: EUROCONTROL LSSIP+ DB
LSSIP Year 2023 Estonia 16 Working Level Agreed
By 2025
- Aeronau�cal Informa�on Exchange - Aerodrome mapping service
[INF10.7] 0 % progress
- Aeronau�cal Informa�on Exchange - Aeronau�cal Informa�on Features service
[INF10.8] 8 % progress
- Meteorological Informa�on Exchange - Aerodrome Meteorological informa�on Service
[INF10.10] 47 % progress
- Electronic Terrain and Obstacle Data (eTOD)
[INF07] 6 % progress
- Stakeholders’ SWIM PKI and cyber security
[INF10.2] 13 % progress
- Meteorological Informa�on Exchange - Network Meteorological Informa�on
[INF10.12] 0 % progress
- Aeronau�cal Informa�on Exchange – Digital NOTAM service
[INF10.6] 64 % progress
- Meteorological Informa�on Exchange - Volcanic Ash Mass Concentra�on informa�on service
[INF10.9] 3 % progress
- Meteorological Informa�on Exchange - En-Route and Approach Meteorological informa�on service
[INF10.11] 5 % progress
Source: EUROCONTROL LSSIP+ DB
By 2027+
- Flight Informa�on Exchange (Yellow Profile) - Data Publica�on Service
[INF10.21] 0 % progress
- Flight Informa�on Exchange (Yellow Profile) - No�fica�on Service
[INF10.20] 0 % progress
- Implement measures to reduce the risk to aircra� opera�ons caused by airspace infringements
[SAF10.1] 30 % progress
- Flight Informa�on Exchange (Yellow Profile) - Flight Data Request Service
[INF10.19] 0 % progress
Source: EUROCONTROL LSSIP+ DB
Airport Objec�ves Tallinn Airport
Deployed in 2023
- Con�nuous Descent Opera�ons (CDO)
[ENV01] 100 % progress
LSSIP Year 2023 Estonia 17 Working Level Agreed
By 2024
- Remote Tower Services
[AOP14.1] 40 % progress
- RNAV 1 in TMA Opera�ons
[NAV03.1] 97 % progress
Source: EUROCONTROL LSSIP+ DB
By 2027+
- Airport Collabora�ve Decision Making (A-CDM)
[AOP05] 1 % progress
Source: EUROCONTROL LSSIP+ DB
LSSIP Year 2023 Estonia 18 Working Level Agreed
Overall situa�on of Implementa�on Objec�ves
Main Objec�ves Topic Progress at the end of
2023 Status 2023 2024 2025 2026 2027 2028
2029 >2029
AOM13.1 Harmonise Opera�onal Air Traffic (OAT) and General Air Traffic (GAT) Handling
56% Ongoing
AOM19.4 Management of Predefined Airspace Configura�ons
100% Completed
AOM19.5 ASM and A-FUA 100% Completed AOM21.1 Direct Rou�ng 0% Not Applicable AOM21.2 Ini�al Free Route Airspace 100% Completed AOM21.3 Enhanced Free Route Airspace Opera�ons 100% Completed *
AOP04.1(EETN) Advanced Surface Movement Guidance and Control System A-SMGCS Surveillance
Service (former ICAO Level 1)
100% Completed
AOP04.2(EETN) Advanced Surface Movement Guidance and Control System (A-SMGCS) Runway Monitoring and Conflict Aler�ng (RMCA) (Airport Safety Support Service = former
ICAO Level 2)
100% Completed *
AOP05(EETN) Airport Collabora�ve Decision Making (A- CDM)
1% Ongoing
AOP10(EETN) Time-Based Separa�on 0% Not Applicable * AOP11.1(EETN) Ini�al Airport Opera�ons Plan 0% Not Applicable * AOP11.2(EETN) Extended Airport Opera�ons Plan 0% Not Applicable * AOP12.1(EETN) Airport Safety Nets 0% Not Applicable * AOP13(EETN) Automated Assistance to Controller for
Surface Movement Planning and Rou�ng 0% Not Applicable *
AOP14.1(EETN) Remote Tower Services 40% Ongoing 2030 AOP15 Enhanced traffic situa�onal awareness
and airport safety nets for the vehicle drivers
0% Not Applicable 2030
AOP16 Guidance assistance through airfield ground ligh�ng
0% Not Applicable 2030
LSSIP Year 2023 Estonia 19 Working Level Agreed
Main Objec�ves Topic Progress at the end of
2023 Status 2023 2024 2025 2026 2027 2028
2029 >2029
AOP17 Provision/integra�on of departure planning informa�on to NMOC
0% Not Applicable 2030
AOP18 Runway Status Lights (RWSL) 0% Not Applicable 2030 AOP19(EETN) Departure Management Synchronised
with Pre-departure sequencing 0% Not Applicable
AOP21 Wake Turbulence Separa�ons for Arrivals based on Sta�c Aircra� Characteris�cs (S-
PWS-A)
0% Not Applicable 2030
AOP23(EETN) Integrated runway sequence for full traffic op�miza�on on single and mul�ple
runway airports
0% Not yet planned 2030
AOP25(EETN) De-icing management tool 0% Not yet planned 2030 AOP26 Reduced separa�on based on local
Runway Occupancy Time (ROT) characterisa�on
0% Not Applicable 2030
ATC02.2 Implement ground based safety nets - Short Term Conflict Alert (STCA) - level 2
for en-route opera�ons
100% Completed
ATC02.8 Ground-Based Safety Nets 100% Completed ATC02.9 Short Term Conflict Alert (STCA) for TMAs 100% Completed
ATC07.1(EETN) AMAN Tools and Procedures 0% Not Applicable ATC12.1 Automated Support for Conflict Detec�on,
Resolu�on Support Informa�on and Conformance Monitoring
100% Completed
ATC15.1 Informa�on Exchange with En-route in Support of AMAN
100% Completed
ATC15.2(EETN) Arrival Management Extended to En-route Airspace
0% Not Applicable *
ATC16 Implement ACAS II compliant with TCAS II change 7.1
100% Completed
ATC18 Mul�-Sector Planning En-route - 1P2T 0% Not Applicable 2030 ATC19(EETN) AMAN/DMAN Integra�on 0% Not Applicable *
LSSIP Year 2023 Estonia 20 Working Level Agreed
Main Objec�ves Topic Progress at the end of
2023 Status 2023 2024 2025 2026 2027 2028
2029 >2029
ATC20 Enhanced STCA with down-linked parameters via Mode S EHS
0% Not Applicable 2030
ATC23 Ini�al Air-Ground Trajectory Informa�on Sharing (Ground Domain)
0% Not yet planned *
ATC25 Ini�al Trajectory Informa�on Sharing ground distribu�on
0% Not yet planned *
ATC26(EETN) Point Merge in complex TMA 0% Not Applicable 2030 COM10.1 Migrate from AFTN to AMHS (Basic
service) 100% Completed
COM10.2 Extended AMHS 100% Completed * COM11.1 Voice over Internet Protocol (VoIP) in En-
Route 100% Completed
COM11.2 Voice over Internet Protocol (VoIP) in Airport/Terminal
100% Completed *
COM12 New Pan-European Network Service (NewPENS)
100% Completed *
COM13 Air Traffic Services (ATS) datalink using SatCom Class B
0% Not yet planned 2030
ENV01(EETN) Con�nuous Descent Opera�ons (CDO) 100% Completed * ENV02(EETN) Airport Collabora�ve Environmental
Management 100% Completed 2030
ENV03(EETN) Con�nuous Climb Opera�ons (CCO) 0% Not Applicable 2030 FCM01 Implement enhanced tac�cal flow
management services 100% Completed
FCM03 Collabora�ve Flight Planning 100% Completed FCM04.2 Enhanced Short Term ATFCM Measures 100% Completed FCM06.1 Automated Support for Traffic Complexity
Assessment and Flight Planning interfaces 100% Completed
FCM10 Interac�ve Rolling NOP 100% Completed * FCM11.1(EETN) Ini�al AOP/NOP Informa�on Sharing 0% Not Applicable * FCM11.2(EETN) AOP/NOP integra�on 0% Not Applicable *
INF07 Electronic Terrain and Obstacle Data 6% Ongoing
LSSIP Year 2023 Estonia 21 Working Level Agreed
Main Objec�ves Topic Progress at the end of
2023 Status 2023 2024 2025 2026 2027 2028
2029 >2029
(eTOD) INF10.10 Meteorological Informa�on Exchange -
Aerodrome Meteorological informa�on Service
47% Ongoing *
INF10.11 Meteorological Informa�on Exchange - En-Route and Approach Meteorological
informa�on service
5% Ongoing *
INF10.12 Meteorological Informa�on Exchange - Network Meteorological Informa�on
0% Planned *
INF10.13 Coopera�ve Network Informa�on Exchange - ATFCM Tac�cal Updates
Service (Airport Capacity and Enroute)
0% Not Applicable *
INF10.14 Coopera�ve Network Informa�on Exchange – Flight Management Service
(Slots and NOP/AOP integra�on)
0% Not Applicable *
INF10.15 Coopera�ve Network Informa�on Exchange – Measures Service (Traffic
Regula�on)
0% Not Applicable *
INF10.16 Coopera�ve Network Informa�on Exchange - Short Term ATFCM Measures
services (MCDM, eHelpdesk, STAM measures)
0% Not Applicable *
INF10.17 Coopera�ve Network Informa�on Exchange – Counts service (ATFCM
Conges�on Points)
0% Not Applicable *
INF10.19 Flight Informa�on Exchange (Yellow Profile) - Flight Data Request Service
0% Planned *
INF10.2 Stakeholders’ SWIM PKI and cyber security
13% Ongoing *
INF10.20 Flight Informa�on Exchange (Yellow Profile) - No�fica�on Service
0% Planned *
INF10.21 Flight Informa�on Exchange (Yellow Profile) - Data Publica�on Service
0% Planned *
LSSIP Year 2023 Estonia 22 Working Level Agreed
Main Objec�ves Topic Progress at the end of
2023 Status 2023 2024 2025 2026 2027 2028
2029 >2029
INF10.23 Flight Informa�on Exchange (Yellow Profile) - Extended AMAN SWIM Service
0% Not Applicable *
INF10.3 Aeronau�cal Informa�on Exchange - Airspace structure service
100% Completed *
INF10.4 Aeronau�cal Informa�on Exchange - Airspace Availability Service
100% Completed *
INF10.5 Aeronau�cal Informa�on Exchange - Airspace Reserva�on (ARES)
3% Ongoing *
INF10.6 Aeronau�cal Informa�on Exchange – Digital NOTAM service
64% Ongoing *
INF10.7 Aeronau�cal Informa�on Exchange - Aerodrome mapping service
0% Ongoing *
INF10.8 Aeronau�cal Informa�on Exchange - Aeronau�cal Informa�on Features service
8% Ongoing *
INF10.9 Meteorological Informa�on Exchange - Volcanic Ash Mass Concentra�on
informa�on service
3% Ongoing *
ITY-ACID Aircra� Iden�fica�on 92% Ongoing ITY-AGDL Ini�al ATC Air-Ground Data Link Services 100% Completed
ITY-AGVCS2 8,33 kHz Air-Ground Voice Channel Spacing below FL195
100% Completed
ITY-COTR Implementa�on of ground-ground automated co-ordina�on processes
100% Completed
ITY-FMTP Common Flight Message Transfer Protocol (FMTP)
100% Completed
NAV03.1(EETN) RNAV 1 in TMA Opera�ons 97% Ongoing 2030 NAV03.2(EETN) RNP 1 in TMA Opera�ons 0% Not Applicable 2030 NAV10(EETN) RNP Approach Procedures to instrument
RWY 100% Completed *
NAV11.1 Implement precision approach procedures using GBAS CAT II based on GAST C
0% Not Applicable 2030
NAV12 ATS IFR Routes for Rotorcra� Opera�ons 0% Not Applicable 2030
LSSIP Year 2023 Estonia 23 Working Level Agreed
Main Objec�ves Topic Progress at the end of
2023 Status 2023 2024 2025 2026 2027 2028
2029 >2029
SAF10.1 Implement measures to reduce the risk to aircra� opera�ons caused by airspace
infringements
30% Ongoing 2030
SAF11.1 Improve Runway Safety by Preven�ng Runway Excursions
100% Completed 2030
LEGEND:
* Full Operational Capability (FOC) date The Planned Implementation Date as reported in the LSSIP DB for each objective
LSSIP Year 2023 Estonia 24 Working Level Agreed
Traffic and Capacity
1.3 Na�onal ATM Structure
Geographical description of the FIR(s)
The geographical scope of this document addresses the Estonia ‘Tallinn Flight Information Region’ FIR:
Tallinn FIR is surrounded by FIRs of 4 States, namely Helsinki FIR and Helsinki TMA in the north, St. Petersburg FIR in the east, Riga FIR/TMA in the south and Sweden FIR-s in the west.
St. Petersburg belongs to the Russian Federation, a non- ECAC State.
The Control Area (CTA) covers the geographical limits of the Tallinn FIR from FL 95 up to FL 660. Control Zones (CTR-s) are implemented around 2 airports, namely Tallinn and Ämari (Military). In addition, there are Kärdla, Kuressaare, Pärnu and Tartu FIZ.
LSSIP Year 2023 Estonia 25 Working Level Agreed
Airspace Classification and Organisation
FIR: SFC - UNL
CTA: FL 95 - FL 660
In accordance with national regulations, only the Imperial System is used in Estonia.
ATC Units
The ATC units in the Estonian airspace, which are of concern to this LSSIP, are the following:
ATC Unit Number of sectors Associated FIR(s) Remarks
En-route TMA
TALLINN ATCC 2+1 1 Tallinn
CTA (Class C)
+ 1 Feeder sector suite operational regularly as from Nov 2005
Tallinn APP 1 Tallinn TMA Collocated with Tallinn ACC
LSSIP Year 2023 Estonia 26 Working Level Agreed
Evolu�on of Traffic in Estonia
2023 Traffic in Estonia increased by 5% compared to 2022 and recovery was at 65% of 2019.
2024-2029
The EUROCONTROL Seven-Year forecast predicts an average annual increase between 0.9% and 4.5% during the planning cycle, with an average baseline growth of 2.7%.
0
50000
100000
150000
200000
250000
2019 A 2020 A 2021 A 2022 A 2023 F 2024 F 2025 F 2026 F 2027 F 2028 F 2029 F
IF R
fli gh
ts
Estonia - Annual IFR Movements
IFR movements - Actuals
IFR movements - Base
IFR movements - High
IFR movements - Low
2020 A 2021 A 2022 A 2023 F 2024 F 2025 F 2026 F 2027 F 2028 F 2029 F
High . . . 6.8% 10.0% 4.0% 3.7% 3.4% 3.3% 2.6% Base -58% 13% 30% 6.1% 8.3% 1.7% 1.9% 1.7% 1.6% 1.0% Low . . . 5.4% 6.2% -0.5% 0.3% 0.0% 0.1% -0.5% High . . . 10% 9.1% 3.6% 3.4% 2.9% 2.7% 2.1% Base -55% 25% 48% 10% 6.9% 1.7% 2.0% 1.7% 1.7% 1.0% Low . . . 8.8% 5.9% -0.1% 0.5% 0.3% 0.4% -0.3%
EUROCONTROL Forecast Update 2023-2029 - October 2023
IFR Movements (Growth)
Estonia
ECAC
LSSIP Year 2023 Estonia 27 Working Level Agreed
Tallinn ACC
Traffic and en-route ATFM delays 2019-2029
2023 performance
Tallinn ACC
Traffic En-route Delay (min. per flight)
Capacity
2023 vs.2022
% of 2019 All reasons
ACC Reference
Value
Capacity Gap?
Baseline
Year +5% 63% 0.00 0.03 No
Summer +9% 66% 0.00 51
Summer 2023 performance assessment
The average delay per flight was zero in Summer 2023.
Opera�onal ac�ons Achieved Comments Review and analysis of exis�ng FRA connec�ng routes (FINEST AREA) Ongoing Pending FINEST state-level agreement
FINEST: review and update of necessary procedures Ongoing Pending FINEST state-level agreement
Bal�c three-state CIV-MIL mee�ngs Ongoing All military exercises in Bal�c Sea region are properly coordinated
Possible modifica�ons according to KPIs and customer feedback Ongoing
Moderniza�on of Tallinn TMA and CTR Ongoing CTR modernisa�on planned for spring 2024, and TMA modernisa�on to be launched during spring 2024
Dynamic sectorisa�on in Tallinn FIR Ongoing Simula�ons are ongoing to find addi�onal configura�ons for summer 2024, based on 2023 airblocks
Harmonized ATC procedures between Finland and Estonia Ongoing Pending FINEST state-level agreement FINEST: review and update of necessary ATM procedures Ongoing Pending FINEST state-level agreement
VCS update 23 MAR 2023 Yes
Maximum configura�on: 3 EETT / 10 FINEST* Yes *Pending FINEST state-level agreement
2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Peak Day Traffic 777 553 468 470 503 Summer Traffic 669 207 318 408 445 Yearly Traffic 605 253 288 365 382 Summer Traffic Forecast - Baseline 473 482 488 495 501 507 Summer Traffic Forecast - High 480 495 508 522 535 546 Summer Traffic Forecast - Low 465 465 466 467 466 465 Summer enroute delay (all causes) 0.01 0.00 0.00 0.00 0.00 Yearly enroute delay (all causes) 0.00 0.00 0.00 0.00 0.00
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0
100
200
300
400
500
600
700
800
900
En ro
ut e
De la
y (m
in ut
es p
er fl
ig ht
)
IF R
fli gh
ts (D
ai ly
A ve
ra ge
) EETTACC - Traffic and en-route ATFM delays
LSSIP Year 2023 Estonia 28 Working Level Agreed
Planning Period – Summer 2024-2029 The planning focuses on the summer season to reflect the most demanding period of the year from a capacity perspective. This approach ensures consistency with the previous planning cycles. The measures for each year are the measures that will be implemented before the summer season.
Summer Capacity Plan
2024 2025 2026 2027 2028 2029
Free Route Airspace Follow up of and possible modifica�ons to support ATFCM
Airspace Management Advanced FUA
FINEST: review and update of necessary procedures
Bal�c three-state CIV-MIL mee�ngs
Airport & TMA Network Integra�on Possible modifica�ons according to KPIs and customer feedback
Moderniza�on of Tallinn CTR
Moderniza�on of Tallinn TMA
Coopera�ve Traffic Management FINEST review and update as necessary
Common FMP for Estonia and Finland
Airspace
Dynamic Cross-border sectorisa�on Estonia/Finland
Dynamic sectorisa�on in
Tallinn FIR
FINEST: review and update of airspace as necessary a�er the FINEST implementa�on
Procedures Harmonized ATC procedures between Finland and Estonia
FINEST: review and update of necessary ATM procedures
Staffing ATCO cross border opera�ons between Finland and Estonia
Technical
ATM system upgrade and
interface with LARA (spring 2024)
Capacity
One configura�on for FINEST managed by common FMP
FINEST capacity based on CAPAN. Pending FINEST
cross-border service with 1FDP
FINEST capacity annual review. Pending FINEST cross-border service with 1FDP
Significant Events
Max sectors 4 EETT 4 EETT 10 FINEST*
4 EETT 10 FINEST*
4 EETT 10 FINEST*
4 EETT 10 FINEST*
4 EETT 10 FINEST*
Planned Annual Capacity Increase 3% 3% 3% 3% 3% 3%
Capacity Profile - Base Annual % Increase 0%
Capacity Plan v. Profile - Base 4%
Annual Reference Value (min) 0.02
Addi�onal informa�on * Pending FINEST cross-border service with 1FDP
LSSIP Year 2023 Estonia 29 Working Level Agreed
0
1
2
3
4
00 :0
0 01
:0 0
02 :0
0 03
:0 0
04 :0
0 05
:0 0
06 :0
0 07
:0 0
08 :0
0 09
:0 0
10 :0
0 11
:0 0
12 :0
0 13
:0 0
14 :0
0 15
:0 0
16 :0
0 17
:0 0
18 :0
0 19
:0 0
20 :0
0 21
:0 0
22 :0
0 23
:0 0
EETTCTA - May-October 2024
Nb sectors (std) Nb sectors (max)
2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2024-2029 Plan 53 55 57 59 61 63 2024-2029 Capacity Profile BASE 51 Capacity Baseline 67 36 40 51 51
0
10
20
30
40
50
60
70
80
Ca pa
ci ty
p ro
fil e
(m ov
em en
ts p
er h
ou r)
EETTCTA - Reference capacity profile
2024-2029 Outlook
No capacity issues are foreseen for Tallinn ACC for the period 2024-2029.
LSSIP Year 2023 Estonia 30 Working Level Agreed
2 Na�onal ATM Environment
Main Na�onal Stakeholders
Civil Regulator(s)
General Information Civil Aviation in Estonia is the responsibility of the Ministry of Climate. The different national entities having regulatory responsibilities in ATM are summarised in the table below. The Estonian Transport Administration is further detailed in the following sections.
Activity in ATM: Organisation responsible Legal Basis
Rulemaking Ministry of Climate Rulemaking: Ministry of Climate.
Statutes of Ministry of Climate
(Regulation of Government of the Republic of Estonia No 71 of 29. June 2023)
Safety Oversight The Estonian Transport Administration (Estonian NSA)
(From 01.01.2021)
Safety Oversight: Estonian Transport Administration
Aviation Act
Statutes of Estonian Transport Administration
(Regulation of the Minister of Economic Affairs and Infrastructure No 82 of 03. December 2020)
Enforcement actions in case of non-compliance with safety regulatory requirements
Estonian NSA Aviation Act
Statutes of Estonian Transport Administration
(Regulation of the Minister of Economic Affairs and Infrastructure No 82 of 03. December 2020)
Airspace Estonian NSA Aviation Act
Statutes of Estonian Transport Administration
(Regulation of the Minister of Economic Affairs and Infrastructure No 82 of 03. December 2020)
Economic MoEA&C Statutes of Ministry of Climate
(Regulation of Government of the Republic of Estonia No 71 of 29. June 2023)
Environment Ministry of Environment Statutes of Climate
(Regulation of Government of the Republic of Estonia No 71 of 29. June 2023)
Security Estonian NSA Aviation Act
Statutes of Estonian Transport Administration
(Regulation of the Minister of Economic Affairs and Infrastructure No 82 of 03. December 2020)
Accident investigation Estonian Safety Investigation Bureau (ESIB)
Aviation Act
Statues of Ministry of Economic Affairs and
LSSIP Year 2023 Estonia 31 Working Level Agreed
Communica�on
(Regula�on of Government of the Republic of Estonia No 323 of 10. December 2002)
Estonian Transport Administration
The Estonian Transport Administration (Estonian NSA) is in the jurisdiction of the Ministry of Climate, and it is the Estonian Safety Supervisory Authority, responsible for exercising state supervision over the compliance with the requirements deriving from legal acts regulating the field of activity of Estonian NSA. It has enforcement powers, and it is the extra-judicial body, which conducts proceedings in matters of misdemeanours. Estonian NSA participates in the drafting of legal acts concerning its area of activities, makes proposals on the amendments of those legal acts, such as the improvement of Estonian-language aviation terminology, participates in the development of policies, strategies, development plans, prepares and implements projects in its area of activities, including international projects. The Estonian NSA is institutionally separated from the Estonian Service Providers.
Annual Report published: Y Annual Safety report of 2023 has been published here.
National Civil Aviation Master Plan (CAMP):
N National CAMP is referenced in ICAO resolutions below:
• A39-23: No Country Left Behind (NCLB) Initiative (Draws the attention of Contracting States requesting technical cooperation and technical assistance to the advantages to be derived from well-defined projects based on civil aviation master plans)
• A39-25: Aviation’s contribution towards the United Nations 2030 Agenda for Sustainable Development (Urges Member States to enhance their air transport systems by effectively implementing SARPs and policies while at the same time including and elevating the priority of the aviation sector into their national development plans supported by robust air transport sector strategic plans and civil aviation master plans, thereby leading to the attainment of the SDGs)
• A39-26: Resource Mobilization (Requests the Secretary General to develop guidance material to assist States in including and elevating the priority of the aviation sector into their national development plans and developing robust air transport sector strategic plans and civil aviation master plans).
The Estonian Transport Administration website is: https://transpordiamet.ee/en
The organization chart is available in Annex D.
LSSIP Year 2023 Estonia 32 Working Level Agreed
Estonian Air Navigation Services - EANS
Service provided
In accordance with international standards the controlled airspace is divided into 3 air traffic control units to fulfil different tasks: Tower Control Unit, Approach Control Unit and Area Control Centre. In addition to these services the ATS units also provide alerting service and flight information service.
The services of EANS are:
- Provision of Air Traffic Service;
- Publication, exchange and dissemination of Aeronautical Information - Aeronautical Information Services;
- Technology: ATM Systems, Navigation, Radio Communication, Surveillance;
- Consultancy Services and expertise in the field of aviation;
- Development activities.
EANS
Governance: MoEA&C Ownership: 100% State (MoEA&C)
Services provided Y/N Comment
ATC en-route Y
ATC approach Y
ATC Aerodrome(s) Y Tallinn CTR.
AIS Y
CNS Y
MET N Estonian Environment Agency
ATCO training Y EANS provides OJT and complementary training.
Others Remote TWR (rAFIS) service in Tallinn for Tartu AD. There is a plan to start provision of the AFIS also at other Estonian regional airports by using Remote TWR (rAFIS) concept.
Additional information: -
Provision of services in other State(s):
N
Annual Report published: Y This is the annual report covering yearly activities of the ANSP.
Further information is available on the EANS website: http://www.eans.ee/en
The organisation chart is available in Annex D.
LSSIP Year 2023 Estonia 33 Working Level Agreed
ATC systems in use
Main ANSP part of any technology alliance1 Y FINEST
FDPS
Specify the manufacturer of the ATC system currently in use: Thales
Upgrade2 of the ATC system is performed or planned? Software and hardware upgrade planned 2024
Replacement of the ATC system by the new one is planned? Not planned
ATC Unit ACC/APP
SDPS
Specify the manufacturer of the ATC system currently in use: Thales
Upgrade of the ATC system is performed or planned? Software and hardware upgrade planned 2024
Replacement of the ATC system by the new one is planned? Not planned
ATC Unit ACC/APP
Airports
General information The main airports of Estonia: Tallinn, Tartu, Kuressaare, Kärdla, Pärnu airports, and Kihnu, Ruhnu airfields are operated by AS Tallinna Lennujaam. It is a 100% State owned stock company under the supervision of the Ministry of Climate.
Airport(s) covered by the LSSIP Referring to the List of Airports in the European ATM Master Plan Level 3 Implementation Plan Edition 2023– Annex 2, it is up to the individual State to decide which additional airports will be reported through LSSIP for those Objectives. The airport that is covered in this LSSIP is Tallinn Airport (non CP1).
https://airport.ee/en/corporate/lennart-meri-tallinn-airport-estonias-aerial-gateway/
The EUROCONTROL Public Airport Corner also provides information for Tallinn Airport: https://ext.eurocontrol.int/airport_corner_public/
The organisation chart is available in Annex D.
1 Technology alliance is an alliance with another service provider for joint procurement of technology from a particular supplier (e.g., COOPANS alliance) 2 Upgrade is defined as any modification that changes the operational characteristics of the system (SES Framework Regulation 549/2004, Article 2 (40))
LSSIP Year 2023 Estonia 34 Working Level Agreed
Meteorological Service Providers
Estonian Environment Agency Estonian Environment Agency, which is responsible for all activities carried out by national civil meteorological and hydrological service. The Estonian Environment Agency is responsible for provision of meteorological service (forecasting and weather warning services) for international and domestic aviation within Tallinn Flight Information Region (FIR), except EEEI AD CTR (MIL). The Weather Forecasting Department is a part of the Estonian Environment Agency (ESTEA).
Estonian Environment Agency`s objective is contribution towards the safety, regularity and efficiency of international air navigation by supplying the operators, flight crew members, air traffic service units, search and rescue services units, airport managements and other customers concerned with the conduct or development of international air navigation with the meteorological information.
The contacts of the Estonian Environment Agency and the Weather Forecasting Department can be found at https://keskkonnaagentuur.ee/en.
Service provided
Estonian Environment Agency provides 24/7 forecasting and weather warning service to Kuressaare, Kärdla, Pärnu, Tallinn, Tartu aerodromes and within Tallinn FIR. Additionally, they provide weather observation service for Estonian Civil Airports.
The organisa�on chart is available in Annex D.
Military Authorities
The Military Authorities in Estonia concerned with ATM are:
- Ministry of Defence;
- Estonian Military Aviation Authority;
- Defence Forces Air Force Staff;
- Ämari Airbase.
They report to the Ministry of Defence.
Their regulatory, service provision and user role in ATM are detailed below.
Estonian Military Aviation Authority is responsible for setting, monitoring and enforcing safety standards through military aviation regulations.
Estonian Defence Forces Air Force Staff is responsible for the safety, monitoring of military aviation tasks and participation in decision making progress concerning airspace management.
Ämari Airbase is responsible for air navigation service at Ämari military airfield and within Ämari control zone.
Co-ordination between civil air navigation service providers and the military authorities is ensured through Letters of Agreements (LoAs).
Further information is available on the Estonian Defence Forces website: https://mil.ee/en.
The organisation chart is available in Annex D.
LSSIP Year 2023 Estonia 35 Working Level Agreed
Regulatory role
Regulatory framework and rulemaking
Oversight
OAT GAT
OAT and provision of service for OAT governed by national legal provisions?
Y Provision of service for GAT by the Military governed by national legal provisions?
Y
Level of such legal provision: Ministry of Defence Level of such legal provision: Ministry of Defence, Estonian NSA
Authority signing such legal provision: Minister of Defence Authority signing such legal provision: Ministry of Defence
These provisions cover: These provisions cover:
Rules of the Air for OAT Y
Organisation of military ATS for OAT Y Organisation of military ATS for GAT Y
OAT/GAT Co-ordination Y OAT/GAT Co-ordination Y
ATCO Training Y ATCO Training Y
ATCO Licensing Y ATCO Licensing Y
ANSP Certification NA ANSP Certification Y
ANSP Supervision NA ANSP Supervision Y
Aircrew Training Y ESARR applicability NA
Aircrew Licensing Y
Additional Information: - Additional Information: -
Means used to inform airspace users (other than military) about these provisions:
Means used to inform airspace users (other than military) about these provisions:
National AIP NA National AIP Y
National Military AIP NA National Military AIP NA
EUROCONTROL eAIP NA EUROCONTROL eAIP NA
Other: Y Other: -
OAT GAT
NSA (as per SES reg. 550/2004) for GAT services provided by the military is CAA.
NSA for OAT is MoD
NSA (as per SES reg. 550/2004) for GAT services provided by the military is Estonian Transport Administration.
Additional information: - Estonian Transport Administration is responsible for the certification for GAT.
LSSIP Year 2023 Estonia 36 Working Level Agreed
Service Provision role
Military ANSP providing GAT services SES certified?
Y If YES, since: 01.05.2017 Duration of the Certificate:
NIL
Certificate issued by: Estonian Transport Administration
If NO, is this fact reported to the EC in accordance with SES regulations?
NA
Additional Information: Military provides service to GAT in Ämari CTR.
User role
OAT GAT
Services Provided: Services Provided:
En-Route N En-Route Military fly GAT, the service is provided by EANS
En-Route N
Approach/TMA N EANS Approach/TMA N
Airfield/TWR/GND Y Airfield/TWR/GND Y
AIS Y AIS N
MET Y MET Y
SAR Y SAR Y
TSA/TRA monitoring Y FIS Y
Other: - Other: -
Additional Information: Additional Information:
IFR inside controlled airspace, Military aircraft can fly?
OAT only N GAT only N Both OAT and GAT Y
If Military fly OAT-IFR inside controlled airspace, specify the available options:
Free Routing Y Within specific corridors only N
Within the regular (GAT) national route network Y Under radar control Y
Within a special OAT route system N Under radar advisory service N
If Military fly GAT-IFR inside controlled airspace, specify existing special arrangements:
No special arrangements Y Exemption from Route Charges N
Exemption from flow and capacity (ATFCM) measures N Provision of ATC in UHF N
CNS exemptions: RVSM N 8.33 N Mode S N ACAS N
Others: Provision of ATC in UHF available only by Ämari TWR.
LSSIP Year 2023 Estonia 37 Working Level Agreed
Flexible Use of Airspace (FUA)
Military in Estonia applies FUA requirements as specified in the Regulation No 2150/2005: Y
FUA Level 1 implemented: Y
FUA Level 2 implemented: Y
FUA Level 3 implemented: Y
LSSIP Year 2023 Estonia 38 Working Level Agreed
3 Implementa�on Projects
The tables below present high-level information about the main projects currently ongoing in Estonia. The details of each project are available in the LSSIP DB.
3.1 Na�onal projects
Name of project: Organisation(s): Schedule: Progress Description: Links: Implementation of UTM software
EANS (EE), Estonian Transport Administration (EE), Frequentis AG
Coordination of unmanned flights in Tallinn CTR started in 2023, services at Tartu and other regional airports will be added in the following years. UTM services for authority users (emergency services, police etc) are planned for 2024-2025. Interfacing with national drone registry is planned for early 2025. Provision of CIS services is planned in the coming years, with the implementation of U-space.
Additional services are added to the UTM system in 2024 March, together with mobile applications for pilots. Project to provide UTM services in Tartu airport begins in II quarter of 2024 with implementation planned for late 2024. Preparations for getting data from national drone registry started in 2023 and will continue throughout 2024. Discussions and workshops to design UTM services for authority users started in early 2024.
-
Navigation Infrastructure Rationalisation
EANS (EE), Estonian Transport Administration (EE)
2024 IQ Implementation and activities are ongoing, project is planned to be implemented by the first quarter of 2024.
L3: NAV03.1
Tallinn Airport A-CDM implementation project
EANS (EE), TALLINN AIRPORT Ltd. (EE)
- Delayed. Due to Covid-19 economic crisis, resources are minimized.
L3: AOP05
LSSIP Year 2023 Estonia 39 Working Level Agreed
Name of project: Organisation(s): Schedule: Progress Description: Links: rTWR Implementation EANS (EE), Estonian
Transport Administration (EE), TALLINN AIRPORT Ltd. (EE)
Tartu is operational since April 2023 and Kuressaare aerodrome should be operational in IIQ 2024.
Two airports' (Kuressaare and Tartu) remote tower installations are ready, governing body Estonian Transportation Administration has issued aeronautical equipment certificate separately for both installations. Service validation activities for Kuressaare aerodrome's remote tower are starting in November 2023. Kuressaare remote tower is expected to be operational in IIQ 2024.
-
3.2 FAB projects
NIL
3.3 Mul�na�onal projects
Name of project: Organisation(s): Schedule: Progress Description: Links: Borealis FRA Implementation (Part 2) (2015_227_AF3_A; 2015_227_AF3_B)
AVINOR AS (NO), AirNav Ireland-ATS Provider (IE), EANS (EE), Fintraffic ANS (FI), LFV (SE), LGS (LV), NATS (UK), Naviair (DK)
2015 - 2024 Work in progress L3: AOM21.2
CONCERTO Solution 2 Borealis Alliance, DLR, EANS (EE), EUROCONTROL, IcelandAir, Thales
Planning in progress Project started 2023.
Implementation planned 2023-2026
-
EANS Support to ACADIA (2022_014_AF5)
EANS (EE), EUROCONTROL Project ongoing Implementation plan established and subtask 2 achieved.
L3: INF10.7, INF10.6, INF10.8
LSSIP Year 2023 Estonia 40 Working Level Agreed
4 Coopera�on Ac�vi�es
4.1 FAB Coordina�on
NEFAB
The main objectives of ANSPs cooperation in the framework of NEFAB are coordination of efforts, sharing of resources
and synergy.
This cooperation includes:
- Coordinated cooperation with States to support NEFAB Committees and Council;
- Analysis and monitoring of SES requirements, coordinating with EU initiatives;
- Common representation of the NEFAB ANSPs at the NMB;
- Cooperation and information sharing between NEFAB ANSPs on CANSO and NM working groups activities;
- Coordinated contribution to NDOP, NDTECH and development of network services.
4.2 Mul�na�onal Coopera�on Ini�a�ves
Borealis FRA
The Borealis Alliance is the industrial partnership between 9 European ANSPs - LFV (Sweden), ANS Finland (Finland), Avinor (Norway), Isavia ANS (Iceland), Naviair (Denmark), EANS (Estonia), IAA (Ireland), LGS (Latvia) and NATS (UK). The objective of the Alliance is to enable joint initiatives to improve flight efficiency and reduce environmental impact, delivered across the whole area in a move which will also streamline cost of services and operational/technical infrastructure.
Alliance continues to work on Free Route Airspace (FRA) Programme execution to create a multi-FAB FRA by establishing interfaces between FRA areas in 3 FABs and Iceland. FRA implementation is still on-going in UK and is expected to complete in 2028.
Meanwhile, the IAA expanded Free Route Airspace (FRA) in 2017 to include Low Level airspace from FL075. In 2019 the Borealis Alliance commenced cross-border FRA between the Maastricht UAC area of responsibility, the DK/SE FAB and the northern part of Germany; and remains open to considering other cross-border proposals should they arise.
Successful FRA implementation in NEFRA airspace enabled the removal of ATS routes in Estonia and Finland. Some other States also consider removal of ATS routes.
FINEST
FINEST is a bilateral coopera�on programme between Estonia EANS and Fintraffic ANS intended to respond to the demands of increased air traffic and Single European Sky requirements.
The objec�ve of FINEST is to achieve op�mal performance in the areas of service provision, cost-efficiency, capacity, flight efficiency, con�nuity and safety. This has been expected to be achieved by providing dynamic cross-border service with common technical system infrastructure from two loca�ons.
LSSIP Year 2023 Estonia 41 Working Level Agreed
The project was kicked off in 2018 and since then, both EANS and Fintraffic ANS have been working together, involving also other par�es in both countries, to both legally and technically make the service provision in the shared airspace happen. FINEST is planned to be launched in phases. ANSP-s have harmonized the ATM System parameters in 2020, have installed the upgraded version of ATM System TopSky on both sides in spring 2021. At the beginning of 2022 EANS finalized airspace changes which is the enabler for the cross border FINEST project and harmonized opera�onal procedures. Due to geopoli�cal situa�on the approval for the project from MoDs have been delayed as addi�onal concerns were raised. Throughout the year 2023 the dialogue with owners and MoDs were kept open to define the way for approval in the changed geopoli�cal situa�on. The cross-border service provision shall be ini�ated a�er the final approval from both Sates.
LSSIP Year 2023 Estonia 42 Working Level Agreed
5 Detailed Objec�ves Implementa�on progress
Objective/Stakeholder Progress Code:
Completed Not yet planned
Ongoing Not Applicable
Planned Missing Data
In 2023, there was a greater focus on mee�ng the requirements of CP1, and several ac�vi�es were completed. Yet some projects have got a delay, and some have been postponed (Due to luck of human resource and budget-related issues).
Main Objectives
AOM13.1
Harmonise Opera�onal Air Traffic (OAT) and General Air Traffic (GAT) Handling Timescales: Ini�al opera�onal capability: 01/01/2012 Full opera�onal capability: 31/12/2018
56 Ongoing
- Ac�vity should be completed by the end 2024. 31/12/2024
REG (By:12/2018) Estonian Air Force (MIL) 40% Ongoing Estonian na�onal military avia�on regula�ons are in force. Review of IFR OAT harmonisa�on procedures is postponed to 2024. - 31/12/2024
Estonian Transport Administra�on 40% Ongoing Objec�ve is in late status. The ac�vity was not completed in 2023 due to ongoing lack of HUM resources. - 31/12/2024
ASP (By:12/2018) EANS 100% Completed Objec�ve ac�vi�es completed by EANS. - 28/02/2022 Estonian Air Force (MIL) 100% Completed Estonian na�onal military avia�on regula�ons are in force. TRG is done. - 31/12/2021
MIL (By:12/2018) Estonian Air Force (MIL) 20% Ongoing Estonian AF will connect na�onal route structures and arrangements to form a flexible system facilita�ng OAT-IFR cross-border flights across Europe and implement harmonized military flight planning for OAT cross-border opera�ons.
- 31/12/2024
SDP 3.1.2 AOM19.4
Management of Predefined Airspace Configura�ons Timescales: Ini�al opera�onal capability: 01/01/2018 Full Opera�onal Capability / Target Date: 31/12/2022
100 Completed
- Objec�ve completed. 27/01/2022
ASP (By:12/2022) EANS 100% Completed
LSSIP Year 2023 Estonia 43 Working Level Agreed
SDP 3.1.2 AOM19.4
Management of Predefined Airspace Configura�ons Timescales: Ini�al opera�onal capability: 01/01/2018 Full Opera�onal Capability / Target Date: 31/12/2022
100 Completed
Objec�ve completed. - 27/01/2022
SDP 3.1.1 AOM19.5
ASM and A-FUA Timescales: Ini�al Opera�onal Capability: 01/01/2014 Full Opera�onal Capability / Target Date: 31/12/2022
100 Completed
- The status of the objec�ve is "late", since project relates to the FINEST project. FINEST was postponed from the co-opera�onal State side. Nonetheless, according to the last feedback received from SDM AF3 Experts (27 Feb 2023): EANS is already compliant even if using a local ASM and not having any automated connec�on with ATC system at the moment, but manually triggering reserved areas on ATCOs CWPs. This automated exchange shall be there for AF5 target date (31.12.2025).
31/12/2021
ASP (By:12/2022) EANS 100% Completed 2022 was planned common ASM system with FINEST CROSS BDRY service, but project postponed. Fully completed when LARA-Topsky interface is implemented. Nonetheless, according to the last feedback received from SDM AF3 Experts (27 Feb 2023): EANS is already compliant even if using a local ASM and not having any automated connec�on with ATC system at the moment, but manually triggering reserved areas on ATCOs CWPs. This automated exchange shall be there for AF5 target date (31.12.2025).
- 31/12/2021
SDP 3.2.1 AOM21.2
Ini�al Free Route Airspace Timescales: Ini�al opera�onal capability: 01/01/2015 Full Opera�onal Capability / Target Date: 31/12/2022
100 Completed
- Free Route Airspace was implemented within NEFAB area on 12 November 2015. 12/11/2015
ASP (By:12/2022) EANS 100% Completed
NEFAB Free Route Airspace was implemented on 12 November 2015. Borealis FRA
Implementa�on (Part 2)
12/11/2015
SDP 3.2.2 AOM21.3
Enhanced Free Route Airspace Opera�ons Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
100 Completed
- Completed. 23/04/2020
ASP (By:12/2025) EANS 100% Completed
LSSIP Year 2023 Estonia 44 Working Level Agreed
SDP 3.2.2 AOM21.3
Enhanced Free Route Airspace Opera�ons Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
100 Completed
- The neighbouring countries with which they have cross-border FRA opera�ons (being) implemented: Latvia, Finland, Sweden. - The TMAs with which FRA connec�vity to TMAs (being) implemented: Helsinki TMA ja Tallinn TMA. - Time limita�ons: NIL - Flight Level: FL095+ excl Tallinn TMA ja Helsinki TMA - Published Constraints: restric�ons Estonian AIP ENR3.3, ENR1 FRA General procedures, ENR 3.5, ENR4.4 (FRA relevance). - Area of Responsibility: Tallinn FIR, NEFRA
- 23/04/2020
AOP04.1
Advanced Surface Movement Guidance and Control System A-SMGCS Surveillance Service (former ICAO Level 1) Timescales: Ini�al opera�onal capability: 01/01/2007 Full opera�onal capability: 31/12/2020
100 Completed
EETN - Tallinn Airport A-SMGCS Level 1 system is implemented on 10 February 2011. 31/12/2013
REG (By:12/2010) Estonian Transport Administra�on 100% Completed Transponder opera�ng procedures are published in the AIP. - 31/12/2013
ASP (By:01/2021) EANS 100% Completed A-SMGCS system on the Tallinn airport is implemented on February, 10 2011. - 28/02/2011
APO (By:01/2021) TALLINN AIRPORT Ltd. 100% Completed A-SMGCS system on the Tallinn airport is implemented on February 10 2011. - 28/02/2011
AOP04.2
Advanced Surface Movement Guidance and Control System (A-SMGCS) Runway Monitoring and Conflict Aler�ng (RMCA) (Airport Safety Support Service = former ICAO Level 2) Timescales: Ini�al opera�onal capability: 01/01/2021 Full opera�onal capability: 31/12/2025
100 Completed
EETN - Tallinn Airport A-SMGCS Level II system at Tallinn Airport is implemented on 10 February 2011. 28/02/2011
ASP (By:12/2025) EANS 100% Completed A-SMGCS Level II system at the Tallinn airport is implemented on 10 February 2011. - 28/02/2011
APO (By:12/2025) TALLINN AIRPORT Ltd. 100% Completed A-SMGCS Level II system at Tallinn Airport is implemented on 10 February 2011. - 28/02/2011
AOP05
Airport Collabora�ve Decision Making (A-CDM) Timescales: Ini�al opera�onal capability: 01/01/2004 Full opera�onal capability: 31/12/2020
1 Ongoing
EETN - Tallinn Airport
LSSIP Year 2023 Estonia 45 Working Level Agreed
AOP05
Airport Collabora�ve Decision Making (A-CDM) Timescales: Ini�al opera�onal capability: 01/01/2004 Full opera�onal capability: 31/12/2020
1 Ongoing
EANS and Tallinn airport postponed the implementa�on of A-CDM at Tallinn aerodrome. A-CDM should be implemented in the frame of project Airport 4.0. 31/12/2030
ASP (By:01/2021)
EANS 0% Not yet planned
The full implementa�on of A-CDM is currently not planned, and a more detailed analysis is planned in 2025.
Tallinn Airport A- CDM
implementa�on project
-
APO (By:01/2021) TALLINN AIRPORT Ltd. 2% Ongoing
The full implementa�on of A-CDM is currently not planned. More detailed analysis is planned in 2025.
Tallinn Airport A- CDM
implementa�on project
31/12/2030
AOP10 Time-Based Separa�on Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport No opera�onal need to implement TBS in EETN -
REG (By:01/2024)
Estonian Transport Administra�on 0% Not Applicable
No opera�onal need to implement TBS in EETN - - ASP (By:12/2024)
EANS 0% Not Applicable
No opera�onal need to implement TBS in EETN - -
SDP 2.2.1 AOP11.1
Ini�al Airport Opera�ons Plan Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport N/A for EETN AD, according to bilateral mee�ng Bilateral mee�ng NEFAB. -
ASP (By:12/2023)
EANS 0% Not Applicable
N/A. - - APO (By:12/2023)
SDP 2.2.2 AOP11.2
Extended Airport Opera�ons Plan Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport Outside of applicability area, EETN is non-CP1 Airport. -
ASP (By:12/2027)
EANS 0% Not Applicable
Outside of applicability area. - - APO (By:12/2027)
LSSIP Year 2023 Estonia 46 Working Level Agreed
SDP 2.2.2 AOP11.2
Extended Airport Opera�ons Plan Timescales: - not applicable -
0 Not Applicable
TALLINN AIRPORT Ltd. 0% Not Applicable
EETN is non-CP1 Airport. - -
SDP 2.3.1 AOP12.1
Airport Safety Nets Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport N/A for EETN AD, according to bilateral mee�ng and MPL3 Plan 2022_Technical Annex_v1.1_ANNEX 3 – APPLICABILITY TO AIRPORTS -
ASP (By:12/2025)
EANS 0% Not Applicable
N/A. - - APO (By:12/2025)
AOP13
Automated Assistance to Controller for Surface Movement Planning and Rou�ng Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport No opera�onal need in EETN -
REG (By:12/2025)
Estonian Transport Administra�on 0% Not Applicable
No opera�onal need in EETN - - ASP (By:12/2025)
EANS 0% Not Applicable
No opera�onal need in EETN - -
SDP 2.1.1 AOP19
Departure Management Synchronised with Pre-departure sequencing Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport EETN is non-CP1 Airport -
ASP (By:12/2022)
EANS 0% Not Applicable
Outside of applicability area. - - APO (By:12/2022)
ATC02.8
Ground-Based Safety Nets Timescales: Ini�al opera�onal capability: 01/01/2009 Full opera�onal capability: 31/12/2021
100 Completed
- System is ready for use, but no demand, thereof ATC TRG NA also. Planned ac�va�on date is unknown. 31/12/2022
ASP (By:12/2021) EANS 100% Completed
LSSIP Year 2023 Estonia 47 Working Level Agreed
ATC02.8
Ground-Based Safety Nets Timescales: Ini�al opera�onal capability: 01/01/2009 Full opera�onal capability: 31/12/2021
100 Completed
MSAW and APM func�ons are technically available in ATM system, however, due to no opera�onal demand and low ground structure, there is no need to ac�vate MSAW and APM func�ons. APW func�on is implemented.
- 31/12/2022
ATC07.1 AMAN Tools and Procedures Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport There is no opera�onal need for basic AMAN. No forecast indica�ng the need. However, EANS is using AMAN for Helsinki inbound traffic and affected by ESSA extended AMAN plans.
-
ASP (By:01/2020)
EANS 0% Not Applicable
There is no opera�onal need for basic AMAN. No forecast indica�ng the need. However, we are using AMAN for Helsinki inbound traffic and affected by ESSA extended AMAN plans.
- -
ATC12.1
Automated Support for Conflict Detec�on, Resolu�on Support Informa�on and Conformance Monitoring Timescales: Ini�al opera�onal capability: 01/01/2015 Full opera�onal capability: 31/12/2021
100 Completed
- MTCD, resolu�on support func�on and MONA are available since 2012. No definite plans to implement TCT. 31/05/2012
ASP (By:12/2021) EANS 100% Completed MTCD, resolu�on support func�on and MONA are available since 2012. No definite plans to implement TCT. - 31/05/2012
ATC15.1
Informa�on Exchange with En-route in Support of AMAN Timescales: Ini�al opera�onal capability: 01/01/2012 Full opera�onal capability: 31/12/2019
100 Completed
- In En-Route opera�ons, informa�on exchange mechanisms, tools and procedures are implemented. 31/01/2017
ASP (By:12/2019) EANS 100% Completed In En-Route opera�ons, informa�on exchange mechanisms, tools and procedures are implemented. - 31/01/2017
SDP 1.1.1 ATC15.2
Arrival Management Extended to En-route Airspace Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport N/A for EETN AD, EETN AD is non-CP1. -
ASP (By:12/2024)
EANS 0% Not Applicable
Tallinn Airport is not listed in CP1 Geographical Scope. - -
LSSIP Year 2023 Estonia 48 Working Level Agreed
SDP 1.2.1 ATC19
AMAN/DMAN Integra�on Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport N/A for EETN AD, Tallinn Airport is not listed in CP1 Geographical Scope. -
ASP (By:12/2027)
EANS 0% Not Applicable
No planned ac�vi�es. Tallinn Airport is not listed in CP1 Geographical Scope. - - APO (By:12/2027)
TALLINN AIRPORT Ltd. 0% Not Applicable
Not planned, Tallinn Airport is not listed in CP1 Geographical Scope. - -
SDP 6.1.2 ATC23
Ini�al Air-Ground Trajectory Informa�on Sharing (Ground Domain) Timescales: Ini�al Opera�onal Capability: 01/01/2024 Full Opera�onal Capability / Target Date: 31/12/2027
0 Not yet planned
- The objec�ve is not planned yet. -
ASP (By:12/2027)
EANS 0% Not yet planned
The objec�ve is not planned yet. - -
SDP 6.3.1 ATC25
Ini�al Trajectory Informa�on Sharing ground distribu�on Timescales: Ini�al Opera�onal Capability: 01/01/2024 Full Opera�onal Capability / Target Date: 31/12/2027
0 Not yet planned
- Not yet planned. -
ASP (By:12/2027)
EANS 0% Not yet planned
Not yet planned. Currently we are looking into the possibility to join the ACDLS. - -
COM10.2
Extended AMHS Timescales: Ini�al Opera�onal Capability: 01/12/2011 Full Opera�onal Capability: 31/12/2024
100 Completed
- AMHS capability is available, tested, validated, but not in use yet. 12/10/2021
ASP (By:12/2024) EANS 100% Completed Capability is available, tested, validated, but not in use. There is no need for enhanced capability. - 12/10/2021
COM11.1
Voice over Internet Protocol (VoIP) in En-Route Timescales: Ini�al opera�onal capability: 01/01/2013 Full opera�onal capability: 31/12/2021
100 Completed
- The VCS project was completed by 23. March 2023. 23/03/2023
ASP (By:12/2021)
LSSIP Year 2023 Estonia 49 Working Level Agreed
EANS 100% Completed The VCS project completed. The new MAIN VoIP VCS and B-up VCS are opera�onal. - 23/03/2023
COM11.2
Voice over Internet Protocol (VoIP) in Airport/Terminal Timescales: Ini�al opera�onal capability: 01/01/2013 Full opera�onal capability: 31/12/2023
100 Completed
- Ac�vi�es are completed, related to the development of remote tower. EETU AD remote Aerodrome Flight Informa�on Service is cer�fied on 20.04.2023. 20/04/2023
ASP (By:12/2023) EANS 100% Completed Ac�vi�es are completed, related to the development of remote tower. - 20/04/2023
COM12
New Pan-European Network Service (NewPENS) Timescales: Ini�al opera�onal capability: 01/01/2018 Full opera�onal capability: 31/12/2024
100 Completed
- CPA has been signed. EANS migrated to NewPENS in July 2019. AD has announced on JAN 2021, that they have no plans to migrate into the NewPENS. 31/07/2019
ASP (By:12/2024) EANS 100% Completed EANS migrated to NewPENS in July 2019. - 31/07/2019
APO (By:12/2024)
TALLINN AIRPORT Ltd. 0% Not Applicable
AD has no plans to migrate into the NewPENS. - -
ENV01
Con�nuous Descent Opera�ons (CDO) Timescales: Ini�al opera�onal capability: 01/07/2007 Full opera�onal capability: 31/12/2023
100 Completed
EETN - Tallinn Airport CDO and P-RNAV procedures were implemented in Tallinn TMA 30 May 2013. Performance monitoring is done. 31/12/2023
ASP (By:12/2023) EANS 100% Completed EANS implemented P-RNAV and CDO techniques in May 2013. Performance monitoring by ANSP side is done via Eurocontrol site htps://ansperformance.eu/ and also in coopera�on with Tallinn Airport.
- 31/12/2023
APO (By:12/2023) TALLINN AIRPORT Ltd. 100% Completed Monitoring of performance is established, data received from EANS. - 31/12/2017
FCM03
Collabora�ve Flight Planning Timescales: Ini�al opera�onal capability: 01/01/2000 Full opera�onal capability: 31/12/2022
100 Completed
-
LSSIP Year 2023 Estonia 50 Working Level Agreed
Func�onality installed and available but problems so far at NM within automa�cally processing and firmly specifying the use of AFP-messages in the Free Route Airspace environment causes that full FoC implementa�on of collabora�ve flight planning. Though all func�onality has been installed according to spec, the interoperability between Thales TopSky and NM system has not been achieved due to complicated FRA opera�ons environment, not fully covered at NM.
01/01/2023
ASP (By:12/2022) EANS 100% Completed Func�onality installed and available but problems so far at NM within automa�cally processing and firmly specifying the use of AFP-messages in the Free Route Airspace environment causes that full FoC implementa�on of collabora�ve flight planning. Though all func�onality has been installed according to spec, the interoperability between Thales TopSky and NM system has not been achieved due to complicated FRA opera�ons environment, not fully covered at NM.
- 01/01/2023
SDP 4.1.1 FCM04.2
Enhanced Short Term ATFCM Measures Timescales: Ini�al opera�onal capability: 01/11/2017 Full Opera�onal Capability / Target Date: 31/12/2022
100 Completed
- STAM is in opera�onal use in accordance to NM CHMI and related training package. 30/06/2023
ASP (By:12/2022) EANS 100% Completed EANS is using NM STAM so�ware tool, and all the needed trainings are completed. - 30/06/2023
SDP 4.3.1 FCM06.1
Automated Support for Traffic Complexity Assessment and Flight Planning interfaces Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target date: 31/12/2022
100 Completed
- ANSP EANS relies to NM system support & development and is using CHMI and NMP Flow applica�on. Processing of APL and ACL messages is completed.
31/12/2023
ASP (By:12/2022) EANS 100% Completed EANS relies to NM system support & development and is using CHMI and NMP Flow applica�on. Processing of APL and ACL messages is completed.
- 31/12/2023
SDP 4.2.1 FCM10
Interac�ve Rolling NOP Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2023
100 Completed
- Objec�ve FCM10 does not apply to Tallinn Airport, therefore SLoA FCM10-APO01 is marked N/A. Which brings FCM10 to ‘Completed’. 30/06/2023
ASP (By:12/2023) EANS 100% Completed CHMI updates and related trainings done. - 30/06/2023
APO (By:12/2023)
LSSIP Year 2023 Estonia 51 Working Level Agreed
SDP 4.2.1 FCM10
Interac�ve Rolling NOP Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2023
100 Completed
TALLINN AIRPORT Ltd. 0% Not Applicable
According to NEFAB Bilateral mee�ng informa�on, objec�ve FCM10 does not apply to Tallinn Airport. - -
SDP 4.2.2 FCM11.1
Ini�al AOP/NOP Informa�on Sharing Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport EETN AD is non-CP1, N/A according to MPL3 Plan 2023 Technical Annex, Annex 3. Nevertheless A-CDM for EETN AD is s�ll in plans, more detailed informa�on is expected to come on 2025.
-
ASP (By:12/2023)
EANS 0% Not Applicable
Outside applicability area. - - APO (By:12/2023)
SDP 4.4.1 FCM11.2
AOP/NOP integra�on Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport EETN AD is non-CP1 Airport, N/A according to MPL3 Plan 2023 Technical Annex 3. -
ASP (By:12/2027)
EANS 0% Not Applicable
Outside applicability area. - - APO (By:12/2027)
INF07
Electronic Terrain and Obstacle Data (eTOD) Timescales: Ini�al opera�onal capability: 01/11/2014 Full opera�onal capability: 31/12/2018
6 Ongoing
- Process is in late status due to constant lack of human resources in NSA. Electronic TOD should be established by 31 December 2024. 31/12/2025
REG (By:01/2019) Estonian Transport Administra�on 8% Ongoing Process is in late status due to constant lack of human resources in NSA. Electronic TOD should be established by 31 December 2024. - 31/12/2024
ASP (By:01/2019) EANS 5% Ongoing No progress compared to last year, EANS cannot con�nue any ac�vity before Na�onal TOD Policy is available. - 31/12/2025
APO (By:01/2019) TALLINN AIRPORT Ltd. 5% Ongoing All AO related ac�vi�es will be performed a�er Na�onal TOD Policy is available. - 31/12/2025
LSSIP Year 2023 Estonia 52 Working Level Agreed
SDP 5.2.1 INF10.2
Stakeholders’ SWIM PKI and cyber security Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
13 Ongoing
- Process is slowly ongoing. 31/12/2025
ASP (By:12/2025) EANS 8% Ongoing EANS will be using the EACP solu�on. - 31/12/2024
APO (By:12/2025)
TALLINN AIRPORT Ltd. 0% Not yet planned
AD has not yet decided, with what to go further and how. Discussions with other local Stakeholders are ongoing. - -
MET (By:12/2025) Estonian Environment Agency 18% Ongoing NIL - 31/12/2025
SDP 5.3.1 INF10.3
Aeronau�cal Informa�on Exchange - Airspace structure service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
100 Completed
- LARA adapted/in use. 10/06/2020
ASP (By:12/2025) EANS 100% Completed LARA is used according to their installa�on. - 10/06/2020
SDP 5.3.1 INF10.4
Aeronau�cal Informa�on Exchange - Airspace Availability Service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
100 Completed
- ANSP has ASM system LARA which provides the AUP/UUP to NM. 31/12/2022
ASP (By:12/2025) EANS 100% Completed EANS has ASM system LARA which provides the AUP/UUP to NM. EANS is par�cipa�ng in LARA user group and also following the ac�vi�es of "ASM SWIM" project ac�vi�es to ensure the compliance of LARA tool.
- 31/12/2022
SDP 5.3.1 INF10.5
Aeronau�cal Informa�on Exchange - Airspace Reserva�on (ARES) Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
3 Ongoing
- LARA is in use. ARES info is visible to all LARA customers who have access to LARA. ANSP is wai�ng for release v5, when LARA will enable to implement the full scope of ARES exchanges via SWIM.
31/12/2024
ASP (By:12/2025) EANS 3% Ongoing
LSSIP Year 2023 Estonia 53 Working Level Agreed
LARA is used. ARES info is visible to all LARA customers who have access to LARA. Systems are used according to their installa�on. Wai�ng for release v5, when LARA will enable to implement the full scope of ARES exchanges via SWIM.
- 31/12/2024
SDP 5.3.1 INF10.6
Aeronau�cal Informa�on Exchange – Digital NOTAM service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
64 Ongoing
- Will be implemented with SWIM and informa�on exchange system developments, systems planned to be ready 2025. 31/12/2025
ASP (By:12/2025) EANS 0% Planned EANS is par�cipa�ng in project ACADIA to ensure accordance. Ac�vi�es started in 2023 and objec�ve is planned to be in opera�onal use by 2025.
EANS Support to ACADIA 31/12/2025
AIS (By:12/2025) EANS 80% Ongoing EANS is par�cipa�ng in project ACADIA to ensure accordance. Ac�vi�es are ongoing in the project plan.
EANS Support to ACADIA 31/12/2025
SDP 5.3.1 INF10.7
Aeronau�cal Informa�on Exchange - Aerodrome mapping service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Ongoing
- Outside of the area of applicability. Nevertheless ANSP is par�cipa�ng in the ACADIA project and aerodrome mapping service is also in the scope.
31/12/2025
AIS (By:12/2025) EANS 10% Ongoing EANS is par�cipa�ng in the ACADIA project and aerodrome mapping service is also in the scope.
EANS Support to ACADIA 31/12/2025
SDP 5.3.1 INF10.8
Aeronau�cal Informa�on Exchange - Aeronau�cal Informa�on Features service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
8 Ongoing
- Ac�vi�es are part of ACADIA project. 31/12/2025
ASP (By:12/2025) EANS 0% Planned
Ac�vi�es part of ACADIA project. EANS Support to ACADIA 31/12/2025
AIS (By:12/2025) EANS 10% Ongoing
Ongoing, ac�vi�es part of ACADIA project. EANS Support to ACADIA 31/12/2025
LSSIP Year 2023 Estonia 54 Working Level Agreed
SDP 5.4.1 INF10.9
Meteorological Informa�on Exchange - Volcanic Ash Mass Concentra�on informa�on service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
3 Ongoing
- Implementa�on should be via ANSP co-opera�on ready for 31.12.2025. 31/12/2025
ASP (By:12/2025) EANS 0% Planned We are planning system upgrades to consume SWIM MET services, depends on MET service provider. - 31/12/2025
MET (By:12/2025) Estonian Environment Agency 3% Ongoing We are planning system upgrades to provide SWIM MET services, poten�al coopera�on with NamCon countries to be clarified during 2024. For the Volcanic Ash Mass Concentra�on Informa�on Service, it is clarified that this informa�on will be provided in SWIM format by the VAACs. The VAACs expects to be fully opera�onal by 2024; ESTEA as MET Provider will contact the UK MET Office and Meteo France in order to discuss the service defini�on in view of the future consump�on of the informa�on.
- 31/12/2025
SDP 5.4.1 INF10.10
Meteorological Informa�on Exchange - Aerodrome Meteorological informa�on Service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
47 Ongoing
- SWIM implementa�on should be ready on 2025. MET ANSP is serving AD and its users as demanded by IR (EU) 2017/373 using TAC/IWXXM. 31/12/2025
ASP (By:12/2025) EANS 0% Planned Depends on MET service provider. - 31/12/2025
APO (By:12/2025) TALLINN AIRPORT Ltd. 0% Planned AS Tallinna Lennujaam (Tallinn Airport Ltd.) is not MET service provider, the service is provided by Environmental Agency (Keskkonnaagentuur) from August 2020.
- 31/12/2024
MET (By:12/2025) Estonian Environment Agency 53% Ongoing MET ANSP is serving AD and its users as demanded by IR (EU) 2017/373 using TAC/IWXXM. - 31/12/2025
SDP 5.4.1 INF10.11
Meteorological Informa�on Exchange - En-Route and Approach Meteorological informa�on service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
5 Ongoing
- SWIM implementa�on should be ready in 2025. 31/12/2025
ASP (By:12/2025) EANS 0% Planned We are planning system upgrades to consume SWIM MET services. - 31/12/2025
MET (By:12/2025) Estonian Environment Agency 7% Ongoing We are planning to provide services accordingly SWIM MET services, poten�al coopera�on within NamCon countries for development. - 31/12/2025
LSSIP Year 2023 Estonia 55 Working Level Agreed
SDP 5.4.1 INF10.12
Meteorological Informa�on Exchange - Network Meteorological Informa�on Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Planned
- SWIM PKI etc. implementa�on should be ready in 2025. ATS ANSP is planning to consume SWIM MET services. 31/12/2025
ASP (By:12/2025) EANS 0% Planned We are planning system upgrades to consume SWIM MET services. - 31/12/2025
MET (By:12/2025)
Estonian Environment Agency 0% Not Applicable
ESTEA do not contribute in EUMETNET CBCF, so we are not mandated to provide the service. - -
SDP 5.5.1 INF10.13
Coopera�ve Network Informa�on Exchange - ATFCM Tac�cal Updates Service (Airport Capacity and Enroute) Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Not Applicable
- Not applicable. -
ASP (By:12/2025)
EANS 0% Not Applicable
Applies only if local complexity tool is used. N/A for this monitoring cycle. - -
SDP 5.5.1 INF10.14
Coopera�ve Network Informa�on Exchange – Flight Management Service (Slots and NOP/AOP integra�on) Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Not Applicable
- As per SDM instruc�ons, Estonia is not mandated to implement iAOP/eAOP (Tallinn Airport is exempted from the implementa�on of (i)AOP). Thereof this objec�ve is reported as Not Applicable,
-
ASP (By:12/2025)
EANS 0% Not Applicable
As per SDM instruc�ons as Estonia is not mandated to implement iAOP/eAOP, this Objec�ve can be reported as Not Applicable. - -
APO (By:12/2025)
TALLINN AIRPORT Ltd. 0% Not Applicable
Not planned either. - -
SDP 5.5.1 INF10.15
Coopera�ve Network Informa�on Exchange – Measures Service (Traffic Regula�on) Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Not Applicable
- Not applicable. -
ASP (By:12/2025)
LSSIP Year 2023 Estonia 56 Working Level Agreed
EANS 0% Not Applicable
Applies only if local complexity tool is used. N/A for this monitoring cycle. - -
SDP 5.5.1 INF10.16
Coopera�ve Network Informa�on Exchange - Short Term ATFCM Measures services (MCDM, eHelpdesk, STAM measures) Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Not Applicable
- Not applicable. -
ASP (By:12/2025)
EANS 0% Not Applicable
Applies only if local complexity tool is used. N/A for this monitoring cycle. - -
SDP 5.5.1 INF10.17
Coopera�ve Network Informa�on Exchange – Counts service (ATFCM Conges�on Points) Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Not Applicable
- Not applicable. -
ASP (By:12/2025)
EANS 0% Not Applicable
Applies only if local complexity tool is used. N/A for this monitoring cycle. - -
SDP 5.6.1 INF10.19
Flight Informa�on Exchange (Yellow Profile) - Flight Data Request Service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Planned
- Planned to reach objec�ve according to SP ac�vi�es. 31/12/2030
ASP (By:12/2025) EANS 0% Planned
LSSIP Year 2023 Estonia 57 Working Level Agreed
SDP 5.6.1 INF10.19
Flight Informa�on Exchange (Yellow Profile) - Flight Data Request Service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Planned
Planned to consume NM B2B services: - ARO briefing systems by 2024 - ac�vi�es ongoing. - ATM systems: TWR systems 2028 (according to CP1 not an obliga�on) and ACC 2030 - ac�vi�es planned. ATM system provider not fully decided. - rTWR: TBD (according to CP1 not an obliga�on). ARO systems: The system will be extended to support the submission of FPL and update messages via NM B2B using their FF-ICE services. The following transforma�ons are done from current message input to service: FilingService: FPL: FiledFlightPlanRequest CHG: FlightPlanUpdateRequest DLA: FlightPlanUpdateRequest CNL: FlightPlanCancella�onRequest TrialService: FPL valida�on only: TrialRequest FlightDataRequestService: RQP: FlightDataRequest RQS: FlightDataRequest No�fica�onService: DEP: FlightDepartureRequest ARR: FlightArrivalRequest When in the Center Terminal a message with above type is sent to the IFPS, then the corresponding B2B service is used for transmi�ng the data via FFICE service instead of AFTN/AMHS message. A system parameter allows to enable/disable the submission of the data via NM B2B. When disabled the message is sent out in the tradi�onal way via AFTN/AMHS ICAO text messages.
- 31/12/2030
SDP 5.6.1 INF10.20
Flight Informa�on Exchange (Yellow Profile) - No�fica�on Service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Planned
- Planned according to SP ac�vi�es. 31/12/2030
ASP (By:12/2025) EANS 0% Planned
LSSIP Year 2023 Estonia 58 Working Level Agreed
SDP 5.6.1 INF10.20
Flight Informa�on Exchange (Yellow Profile) - No�fica�on Service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Planned
Planned to consume NM B2B services (ATM systems and ARO briefing). - ARO briefing systems by 2025 - ac�vi�es ongoing. - ATM systems: TWR systems 2028 (not CP1 obliga�on) and ACC 2030 - ac�vi�es planned (ATM system provider not fully decided). - rTWR: TBD (not CP1 obliga�on). ARO systems: The system will be extended to support the submission of FPL and update messages via NM B2B using their FF-ICE services. The following transforma�ons are done from current message input to service: FilingService: FPL: FiledFlightPlanRequest CHG: FlightPlanUpdateRequest DLA: FlightPlanUpdateRequest CNL: FlightPlanCancella�onRequest TrialService: FPL valida�on only: TrialRequest FlightDataRequestService: RQP: FlightDataRequest RQS: Flight Data Request No�fica�onService: DEP: FlightDepartureRequest ARR: FlightArrivalRequest When in the Center Terminal a message with above type is sent to the IFPS, then the corresponding B2B service is used for transmi�ng the data via FFICE service instead of AFTN/AMHS message. A system parameter allows to enable/disable the submission of the data via NM B2B. When disabled the message is sent out in the tradi�onal way via AFTN/AMHS ICAO text messages.
- 31/12/2030
SDP 5.6.1 INF10.21
Flight Informa�on Exchange (Yellow Profile) - Data Publica�on Service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Planned
- Planned according to SP ac�vi�es. 31/12/2030
ASP (By:12/2025) EANS 0% Planned
LSSIP Year 2023 Estonia 59 Working Level Agreed
SDP 5.6.1 INF10.21
Flight Informa�on Exchange (Yellow Profile) - Data Publica�on Service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Planned
Planned to consume NM B2B services (ATM systems and ARO briefing). ARO systems will be ready by 2025, ATM systems by 2030. ARO systems: The system will be extended to support the submission of FPL and update messages via NM B2B using their FF-ICE services. The following transforma�ons are done from current message input to service: FilingService: FPL: FiledFlightPlanRequest CHG: FlightPlanUpdateRequest DLA: FlightPlanUpdateRequest CNL: FlightPlanCancella�onRequest TrialService: FPL valida�on only: TrialRequest FlightDataRequestService: RQP: FlightDataRequest RQS: FlightDataRequest No�fica�onService: DEP: FlightDepartureRequest ARR: FlightArrivalRequest When in the Center Terminal a message with above type is sent to the IFPS, then the corresponding B2B service is used for transmi�ng the data via FFICE service instead of AFTN/AMHS message. A system parameter allows to enable/disable the submission of the data via NM B2B. When disabled the message is sent out in the tradi�onal way via AFTN/AMHS ICAO text messages.
- 31/12/2030
SDP 5.6.1 INF10.23
Flight Informa�on Exchange (Yellow Profile) - Extended AMAN SWIM Service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Not Applicable
- N/A as there are no domes�c airports to which this applies (EETN AD is not CP1 AD). -
ASP (By:12/2025)
EANS 0% Not Applicable
N/A as there are no domes�c airports to which this applies. - -
ITY-ACID
Aircra� Iden�fica�on Timescales: Entry into force of the Regula�on: 13/12/2011 System capability: 02/01/2020
92 Ongoing
- EANS have sent template for Mode S Declara�on to NM on 30/01/2020, confirming that Mode S is implemented in Tallinn FIR above FL95. System will be fully implemented when neighbouring ANSP-s have the capability as well.
31/12/2024
LSSIP Year 2023 Estonia 60 Working Level Agreed
ITY-ACID
Aircra� Iden�fica�on Timescales: Entry into force of the Regula�on: 13/12/2011 System capability: 02/01/2020
92 Ongoing
ASP (By:01/2020) EANS 92% Ongoing EANS have sent template for Mode S Declara�on to NM on 30/01/2020, confirming that Mode S is implemented in Tallinn FIR above FL95. According to the response from NM, the system can only be implemented when neighbouring countries are ready. Will be fully implemented when neighbouring ANSP-s have the capability.
- 31/12/2024
ITY-AGDL
Ini�al ATC Air-Ground Data Link Services Timescales: Entry into force: 06/02/2009 ATS unit opera�onal capability: 05/02/2018 Aircra� capability: 05/02/2020
100 Completed
- Estonia implemented CPDLC in Tallinn FIR in June 2018. LOF and NAN implementa�on finished 30.12.2021. 30/12/2021
REG (By:02/2018) Estonian Transport Administra�on 100% Completed ECAA will ensure the processing and the distribu�on of the informa�on on the data link capability by the IFPS. - 30/04/2018
ASP (By:02/2018) EANS 100% Completed Implementa�on was finished in June 2018 (SITA 06.04.2018, ARINC 28.06.2018). Procedures implemen�ng the Next Authority process is implemented with Sweden, Finland (2021) and Latvia (2021).
Air-ground data link
implementa�on 30/12/2021
MIL (By:01/2019)
Estonian Air Force (MIL) 0% Not Applicable
Data link capability is not required. - -
ITY-AGVCS2
8,33 kHz Air-Ground Voice Channel Spacing below FL195 Timescales: Entry into force: 07/12/2012 New and upgraded radio equipment: 17/11/2013 New or upgraded radios on State aircra�: 01/01/2014 Interim target for freq. conversions: 31/12/2014 All radio equipment: 31/12/2017 All frequencies converted: 31/12/2018 State aircra� equipped, except those no�fied to EC: 31/12/2018 State aircra� equipped, except those exempted [Art 9(11)]: 31/12/2020
100 Completed
- Tallinn FIR radio renewed according to Implemen�ng Regula�on (EU) No 1079/2012 in December 2015. 31 frequencies converted on 02/01/2020. Estonia has 61 frequencies, from which 49 are converted as of 03/01/2020 (was reported to SAFIRE Data base). 9 frequencies are exempted (shall be converted on 2027), 3 are interna�onal frequencies, which should not be converted.
02/01/2020
REG (By:12/2018) Estonian Transport Administra�on 100% Completed Tallinn FIR radio renewed according to Implemen�ng Regula�on (EU) No 1079/2012 in December 2015. Frequency converted on 02/01/2020. - 02/01/2020
ASP (By:12/2018)
LSSIP Year 2023 Estonia 61 Working Level Agreed
ITY-AGVCS2
8,33 kHz Air-Ground Voice Channel Spacing below FL195 Timescales: Entry into force: 07/12/2012 New and upgraded radio equipment: 17/11/2013 New or upgraded radios on State aircra�: 01/01/2014 Interim target for freq. conversions: 31/12/2014 All radio equipment: 31/12/2017 All frequencies converted: 31/12/2018 State aircra� equipped, except those no�fied to EC: 31/12/2018 State aircra� equipped, except those exempted [Art 9(11)]: 31/12/2020
100 Completed
EANS 100% Completed Frequency converted on 02/01/2020. - 02/01/2020
MIL (By:12/2020) Estonian Air Force (MIL) 100% Completed All of the State aircra� are equipped with 8,33 kHz radios. - 31/12/2018
APO (By:12/2018) TALLINN AIRPORT Ltd. 100% Completed There are 2 working channels on EETN AD, what are converted accordingly. REF EST AIP AD 2.EETN, EETN AD 2.18. Non-8,33 kHz equipped vehicles do not communicate with aircra�s.
- 02/01/2020
Estonian Air Force (MIL) 0% Not Applicable
NATO combined frequency requirements will maintain the 122,100 MHz frequency in 25 kHz channel spacing un�l a suitable alterna�ve is found. - -
ITY-FMTP
Common Flight Message Transfer Protocol (FMTP) Timescales: Entry into force of regula�on: 28/06/2007 All EATMN systems put into service a�er 01/01/09: 01/01/2009 All EATMN systems in opera�on by 20/04/11: 20/04/2011 Transi�onal arrangements: 31/12/2012 Transi�onal arrangements when bilaterally agreed between ANSPs: 31/12/2014
100 Completed
- A common flight message transfer protocol (FMTP) is implemented during a major system upgrade. However, IPver6 is not fully implemented. Connec�ons with Malmö and Stockholm of Sweden are opera�onal since August 2015.
31/12/2018
ASP (By:12/2014) EANS 100% Completed Completed. - 31/12/2018
MIL (By:12/2014)
Estonian Air Force (MIL) 0% Not Applicable
Military ATC do not provide RADAR services - -
NAV03.1
RNAV 1 in TMA Opera�ons Timescales: Ini�al opera�onal capability: 01/01/2001 One SID and STAR per instrument RWY, where established: 25/01/2024 All SIDs and STARs per instrument RWY, where established: 06/06/2030
97 Ongoing
EETN - Tallinn Airport
LSSIP Year 2023 Estonia 62 Working Level Agreed
RNAV 1 procedures and CDA in Tallinn TMA implemented on 30 May 2013. Estonia’s PBN Implementa�on (transi�on) plan has successfully passed consulta�on with Estonian Stakeholders and with Network Manager (NM). The Plan has also been commented by IATA. PBN Implementa�on Plan Ver 1.0 document was approved by CAA and communicated to the neighbouring ATC Centres. Naviga�on infrastructure ra�onaliza�on project was delayed due to economic crises caused by COVID 19, project is ongoing.
21/03/2024
REG (By:06/2030) Estonian Transport Administra�on 100% Completed
The transi�on plan for PBN is approved by NSA in DEC 2020. Naviga�on
Infrastructure Ra�onalisa�on
31/12/2020
ASP (By:06/2030) EANS 96% Ongoing Estonia’s PBN Implementa�on (transi�on) plan has successfully passed consulta�on with Estonian Stakeholders and with Network Manager (NM). The Plan has also been commented by IATA. PBN Implementa�on Plan Ver 1.0 document was approved by CAA and communicated to the neighbouring ATC Centres. Naviga�on infrastructure ra�onalisa�on project is ongoing.
Naviga�on Infrastructure Ra�onalisa�on
21/03/2024
NAV03.2 RNP 1 in TMA Opera�ons Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport There is no inten�on to Implement it because it is not jus�fied par�cularly in terms of the cost/benefit ra�o as RNAV1 is considered to be sufficient. -
REG (By:06/2030)
Estonian Transport Administra�on 0% Not Applicable
There is no inten�on to Implement it because it is not jus�fied par�cularly in terms of the cost/benefit ra�o as RNAV1 is considered to be sufficient. - -
ASP (By:06/2030)
EANS 0% Not Applicable
There is no inten�on to Implement it because it is not jus�fied par�cularly in terms of the cost/benefit ra�o as RNAV1 is considered to be sufficient. - -
NAV10
RNP Approach Procedures to instrument RWY Timescales: Ini�al opera�onal capability: 01/06/2011 Instrument RWY ends without precision approach in EU SES States.: 03/12/2020 Instrument RWY ends served by precision approach.: 25/01/2024
100 Completed
EETN - Tallinn Airport RNP APCH procedures are published and implemented at EETN, EEKE, EEKA, EEPU and EETU aerodromes. EANS PBN Transi�on plan has been dra�ed and submited to CAA and MIL.
21/04/2022
REG (By:01/2024) Estonian Transport Administra�on 100% Completed The na�onal PBN plan is approved by NSA in DEC 2020. - 31/12/2020
ASP (By:01/2024) EANS 100% Completed
LSSIP Year 2023 Estonia 63 Working Level Agreed
NAV10
RNP Approach Procedures to instrument RWY Timescales: Ini�al opera�onal capability: 01/06/2011 Instrument RWY ends without precision approach in EU SES States.: 03/12/2020 Instrument RWY ends served by precision approach.: 25/01/2024
100 Completed
RNP APCH procedures are published and implemented at EETN, EEKE, EEKA, EETU and EEPU aerodromes. PBN Implementa�on (transi�on) plan is approved by ECAA.
RNP APCH procedures
implementa�on on EETN
aerodrome
21/04/2022
NAV12
ATS IFR Routes for Rotorcra� Opera�ons Timescales: Rotorcra� RNP0.3, RNP1 or RNAV1 ATS routes above FL150, where established.: 03/12/2020 One rotorcra� RNP0.3, RNP01 or RNAV1 SID and STAR per instrument RWY, where established.: 25/01/2024 Rotorcra� RNP0.3, RNP1 or RNAV1 ATS routes below FL150, where established.: 25/01/2024 All rotorcra� RNP0.3, RNP01 or RNAV1 SIDs and STARs per instrument RWY, where established.: 06/06/2030
0 Not Applicable
- Tallinn FIR is FRA. ATS IFR routes for rotorcra� opera�on implementa�on are not planned. -
REG (By:06/2030)
Estonian Transport Administra�on 0% Not Applicable
Tallinn FIR is FRA. ATS IFR routes for rotorcra� opera�on implementa�on are not planned, no demand, too exiguous IFR rotocra� traffic. - -
ASP (By:06/2030)
EANS 0% Not Applicable
LLR procedures only in Tallinn CTR are completed. No other plans to implement. - -
LSSIP Year 2023 Estonia 64 Working Level Agreed
Additional Objectives for ICAO ASBU Monitoring
AOM21.1
Direct Rou�ng (Outside Applicability Area) Timescales: - not applicable -
0 Not Applicable
- Estonia is outside for the objec�ve applicability area. FRA is implemented. -
ASP (By:12/2017)
EANS 0% Not Applicable
FRA is implemented. - -
ATC02.2
Implement ground based safety nets - Short Term Conflict Alert (STCA) - level 2 for en-route opera�ons Timescales: Ini�al opera�onal capability: 01/01/2008 Full opera�onal capability: 31/01/2013
100 Completed
- STCA Level II func�on was implemented in 2012 and safety assessment was performed. Safety oversight was conducted on �me.
31/12/2012
ASP (By:01/2013) EANS 100% Completed The EUROCAT 2000 System has STCA implemented and opera�onal (Ini�al Opera�onal Capability). The STCA Level 2 was implemented and opera�onal since 2002. FOC was implemented in March 2012.
- 31/12/2012
ATC02.9
Short Term Conflict Alert (STCA) for TMAs Timescales: Ini�al opera�onal capability: 01/01/2018 Full opera�onal capability: 31/12/2020
100 Completed
- STCA func�on is implemented. 31/12/2012
ASP (By:12/2020) EANS 100% Completed STCA func�on is implemented. - 31/12/2012
ATC16
Implement ACAS II compliant with TCAS II change 7.1 Timescales: Ini�al opera�onal capability: 01/03/2012 Full opera�onal capability: 31/12/2015
100 Completed
- ACAS II compliant with TCAS II change 7.1 is implemented on �me. 04/01/2019
REG (By:12/2015) Estonian Transport Administra�on 100% Completed ECAA has supervised compliance with regulatory provisions for ACAS II (TCAS II version 7.1). - 31/12/2015
ASP (By:03/2012) EANS 100% Completed The ATC staff was trained in December 2015. - 31/12/2015
MIL (By:12/2015) Estonian Air Force (MIL) 100% Completed Estonian Air Force M-28 transport-type aircra� are TCAS II 7.1 equipped. - 04/01/2019
LSSIP Year 2023 Estonia 65 Working Level Agreed
COM10.1
Migrate from AFTN to AMHS (Basic service) Timescales: Ini�al Opera�onal Capability: 01/12/2011 Full Opera�onal Capability: 31/12/2018
100 Completed
- Exis�ng COM centres are upgraded to provide AMHS capability or implement EATMP Communica�ons Gateway (ECG). 31/12/2018
ASP (By:12/2018) EANS 100% Completed The migra�on took place in August 2016. - 31/12/2018
FCM01
Implement enhanced tac�cal flow management services Timescales: Ini�al opera�onal capability: 01/08/2001 Full opera�onal capability: 31/12/2006
100 Completed
- Since May 2008, Estonia is in the IFPS zone. Currently only the FMP is connected to NM. During the major system upgrade, all the requirements were implemented in 2012. FSA, CPR format tuning and tes�ng completed. NM/ETFMS supplies with flight plan related updates that are only available shortly before departure.
30/06/2015
ASP (By:07/2014) EANS 100% Completed All necessary func�onali�es are installed during system upgrade. Tuning, tes�ng and LoA revision completed. - 30/06/2015
ITY-COTR
Implementa�on of ground-ground automated co- ordina�on processes Timescales: Entry into force of Regula�on: 27/07/2006 For pu�ng into service of EATMN systems in respect of no�fica�on and ini�al coordina�on processes: 27/07/2006 For pu�ng into service of EATMN systems in respect of Revision of Coordina�on, Abroga�on of Coordina�on, Basic Flight Data and Change to Basic Flight Data: 01/01/2009 To all EATMN systems in opera�on by 12/2012: 31/12/2012
100 Completed
- Implementa�on of G-G automated co-ordina�on has been finalised within Eurocat 2000 upgrade project in 2012. 31/12/2012
ASP (By:12/2012) EANS 100% Completed OLDI basic messages exchange is implemented. Other ground-ground automated coordina�on processes and the training of ATC personnel have been performed.
- 31/12/2012
MIL (By:12/2012)
Estonian Air Force (MIL) 0% Not Applicable
OLDI not required as EAF currently provides only ADI service. Other ground- ground automated coordina�on is planned. - -
LSSIP Year 2023 Estonia 66 Working Level Agreed
Local Objectives
Note: Local Objectives are addressing solutions that are considered beneficial for specific operating environments, therefore for which a clear widespread commitment has not been expressed yet. They are characterised with no deadline and voluntary applicability area.
AOP14.1 Remote Tower Services Applicability and timescale: Local 40 Ongoing
EETN - Tallinn Airport EANS (not EETN AD) runs rTWR implementa�on project. - The Remote Tower Center is in Tallinn, in EANS headquarters. Two airports' (Kuressaare and Tartu) remote tower installa�ons are ready, governing body Estonian Transporta�on Administra�on has issued aeronau�cal equipment cer�ficate separately for both installa�ons. Remote tower for Tartu aerodrome went fully opera�onal in April 2023, since then the service has been provided only from the remote tower center in Tallinn. Service valida�on ac�vi�es for Kuressaare aerodrome's remote tower started in November 2023. Kuressaare remote tower is expected to be opera�onal in March 2024. - Future: The Remote Tower Centre is planned for all four Estonian regional aerodromes (Tartu, Kuressaare, Kärdla and Pärnu (not planned for EETN AD)). - For daily service provision.
31/03/2024
REG (By:) Estonian Transport Administra�on Ongoing EANS (not EETN AD) runs rTWR implementa�on project. - The Remote Tower Center is in Tallinn, in EANS headquarters. Two airports' (Kuressaare and Tartu) remote tower installa�ons are ready, governing body Estonian Transporta�on Administra�on has issued aeronau�cal equipment cer�ficate separately for both installa�ons. Remote tower for Tartu aerodrome went fully opera�onal in April 2023, since then the service has been provided only from the remote tower center in Tallinn. Service valida�on ac�vi�es for Kuressaare aerodrome's remote tower (rAFIS) started in November 2023. Kuressaare remote tower is expected to be opera�onal in March 2024. - Future: The Remote Tower Centre is planned for all four Estonian regional aerodromes (Tartu, Kuressaare, Kärdla and Pärnu (not planned for EETN AD)). - For daily service provision.
- 31/03/2024
ASP (By:) EANS Ongoing EANS (not EETN AD) runs rTWR implementa�on project. - The Remote Tower Center is in Tallinn, in EANS headquarters. Two airports' (Kuressaare and Tartu) remote tower installa�ons are ready, governing body Estonian Transporta�on Administra�on has issued aeronau�cal equipment cer�ficate separately for both installa�ons. Remote tower for Tartu aerodrome went fully opera�onal in April 2023, since then the service has been provided only from the remote tower center in Tallinn. Service valida�on ac�vi�es for Kuressaare aerodrome's remote tower were star�ng in November 2023. Kuressaare remote tower is expected to be opera�onal in March 2024. - The Remote Tower Centre is planned for all four Estonian regional aerodromes – Tartu, Kuressaare, Kärdla and Pärnu (not planned for EETN AD). - For daily service provision.
- 31/03/2024
APO (By:) TALLINN AIRPORT Ltd. Ongoing
LSSIP Year 2023 Estonia 67 Working Level Agreed
AOP14.1 Remote Tower Services Applicability and timescale: Local 40 Ongoing
EANS (not EETN AD) runs rTWR implementa�on project. Project is connected to Tallinn Airports Ltd-s ac�vi�es, since all regional airports are under Tallinn Airport Ltd.
- 31/03/2024
AOP15
Enhanced traffic situa�onal awareness and airport safety nets for the vehicle drivers Applicability and timescale: Local
0 Not Applicable
- Not planned. -
REG (By:04/2019)
Estonian Transport Administra�on Not Applicable
Not planned. - - APO (By:)
TALLINN AIRPORT Ltd. Not Applicable
Not planned. - -
AOP16 Guidance assistance through airfield ground ligh�ng Applicability and timescale: Local
0 Not Applicable
- Not planned. -
ASP (By:)
EANS Not Applicable
Not planned. - - APO (By:)
TALLINN AIRPORT Ltd. Not Applicable
Not planned. - -
AOP17
Provision/integra�on of departure planning informa�on to NMOC Applicability and timescale: Local
0 Not Applicable
- NA for State. EANS and Tallinn airport postponed the implementa�on of A-CDM at Tallinn aerodrome. A-CDM should be implemented in the frame of project Airport 4.0 and implementa�on probably not earlier than 31.12.2030.
-
ASP (By:)
EANS Not Applicable
EANS and Tallinn airport postponed the implementa�on of A-CDM at Tallinn aerodrome. A-CDM should be implemented in the frame of project Airport 4.0 and implementa�on probably not earlier than 31.12.2030.
- -
AOP18 Runway Status Lights (RWSL) Applicability and timescale: Local
0 Not Applicable
- Traffic density does not jus�fy the implementa�on of the Objec�ve and we`ll keep status N/A. -
REG (By:)
LSSIP Year 2023 Estonia 68 Working Level Agreed
AOP18 Runway Status Lights (RWSL) Applicability and timescale: Local
0 Not Applicable
Estonian Transport Administra�on Not Applicable
Traffic density does not jus�fy the implementa�on of the Objec�ve. - - ASP (By:)
EANS Not Applicable
Traffic density does not jus�fy the implementa�on of the Objec�ve. - - APO (By:)
TALLINN AIRPORT Ltd. Not Applicable
Traffic density does not jus�fy the implementa�on of the Objec�ve. - -
AOP21
Wake Turbulence Separa�ons for Arrivals based on Sta�c Aircra� Characteris�cs (S-PWS-A) Applicability and timescale: Local
0 Not Applicable
- No opera�onal need at the moment. -
ASP (By:)
EANS Not Applicable
No opera�onal needs at the moment. - -
AOP23 Integrated runway sequence for full traffic op�miza�on on single and mul�ple runway airports Applicability and timescale: Local
0 Not yet planned
EETN - Tallinn Airport N/A for EETN AD, Tallinn Airport is not listed in CP1 Geographical Scope. AD has not planned it (yet). -
ASP (By:)
EANS Not yet planned
Depends on Tallinn airport plans. - - APO (By:)
TALLINN AIRPORT Ltd. Not yet planned
Not yet planned. - -
AOP25 De-icing management tool Applicability and timescale: Local 0 Not yet
planned
EETN - Tallinn Airport Development according to SP-s ac�vi�es. -
ASP (By:)
EANS Not yet planned
Further plans depend on EETN airport. - - APO (By:)
TALLINN AIRPORT Ltd. Not yet planned
Not yet planned. - -
LSSIP Year 2023 Estonia 69 Working Level Agreed
AOP26
Reduced separa�on based on local Runway Occupancy Time (ROT) characterisa�on Applicability and timescale: Local
0 Not Applicable
- N/A, not planned either. -
ASP (By:)
EANS Not Applicable
Local objec�ve, not planned. - -
ATC18 Mul�-Sector Planning En-route - 1P2T Applicability and timescale: Local 0 Not
Applicable
- N/A, but objec�ve might come into the plans, in case FINEST realizes. -
ASP (By:01/2030)
EANS Not Applicable
N/A - -
ATC20 Enhanced STCA with down-linked parameters via Mode S EHS Applicability and timescale: Local
0 Not Applicable
- Estonia is outside of applicability area. SFL via Mode-S EHS is implemented. No need for enhancement of STCA with selected flight level is iden�fied.
-
REG (By:01/2030)
Estonian Transport Administra�on Not Applicable
Estonia is outside of applicability area. - - ASP (By:01/2030)
EANS Not Applicable
SFL via Mode S EHS is implemented. No need for enhancement of STCA with selected flight level is iden�fied. - -
ATC26 Point Merge in complex TMA Applicability and timescale: Local 0 Not
Applicable
EETN - Tallinn Airport Not planned. -
ASP (By:)
EANS Not Applicable
No plans to implement. - -
COM13 Air Traffic Services (ATS) datalink using SatCom Class B Applicability and timescale: Local 0 Not yet
planned
- Subject to local need, It has not yet been decided whether ANSP will par�cipate in the test phase. -
REG (By:)
Estonian Transport Administra�on Not Applicable
LSSIP Year 2023 Estonia 70 Working Level Agreed
COM13 Air Traffic Services (ATS) datalink using SatCom Class B Applicability and timescale: Local 0 Not yet
planned
N/A, and it has not yet been decided whether ANSP will par�cipate in the test phase. - -
ASP (By:)
EANS Not yet planned
NYP, lack of resources at the moment. - -
ENV02 Airport Collabora�ve Environmental Management Applicability and timescale: Local 100 Completed
EETN - Tallinn Airport Tallinn Airport has implemented Collabora�ve Environmental Management (CEM). 31/12/2016
ASP (By:) EANS Completed Completed - 31/12/2016
APO (By:) TALLINN AIRPORT Ltd. Completed Completed - 31/12/2016
ENV03 Con�nuous Climb Opera�ons (CCO) Applicability and timescale: Local 0 Not
Applicable
EETN - Tallinn Airport Not applicable at State level. Nevertheless, EETN AD has got the noise abatement procedures, what are applicable below the al�tude of 3000 � AMSL. REF EST AIP EETN AD 2.21.
-
ASP (By:)
EANS Not Applicable
Not applicable at State level. - - APO (By:)
TALLINN AIRPORT Ltd. Not Applicable
Not applicable at State level. - -
NAV11.1
Implement precision approach procedures using GBAS CAT II based on GAST C Applicability and timescale: Local
0 Not Applicable
- Subject to local need, not planned. -
REG (By:)
Estonian Transport Administra�on Not Applicable
ANSP has no plans to implement. - - ASP (By:)
EANS Not Applicable
EANS has no plans to implement precision approach procedures using GBAS CAT II based on GAST C. Considering the traffic capacity, it is not reasonable. - -
LSSIP Year 2023 Estonia 71 Working Level Agreed
SAF10.1 Implement measures to reduce the risk to aircra� opera�ons caused by airspace infringements Applicability and timescale: Local
30 Ongoing
- Ac�vity ongoing. 31/12/2030
REG (By:) Estonian Transport Administra�on Ongoing NIL - 31/12/2030
ASP (By:) EANS Ongoing According to EAPAIRR ques�onnaire, some of the parts of the European Ac�on Plan for Airspace Infringement Risk Reduc�on, are completed, some are ongoing and not yet planned.
- 31/12/2030
AIS (By:) EANS Ongoing Improving availability and access of VFR en-route charts ongoing, planned to analyse GPS moving maps on portable devices. AIM1 in SAF EAPAIRR ques�onnaire ongoing.
- 31/12/2025
SAF11.1 Improve Runway Safety by Preven�ng Runway Excursions Applicability and timescale: Local 100 Completed
- Since not all the ac�vi�es are reasonable to implement and some are constantly ongoing (others completed), we have considered this area Completed. 31/12/2023
REG (By:) Estonian Transport Administra�on Completed Some ASP_EANS ac�vi�es are constantly ongoing, others are completed. It has decided not to plan Approach Path Management (depending on the future traffic types/amount- thus plans might change).
- -
ASP (By:) EANS Completed GAPPRE Recommenda�ons ANSP3 and ANSP6 are constantly ongoing as they are part of the safety everyday work in ANSP. Other Recommenda�ons for ANSP completed.
- -
APO (By:) TALLINN AIRPORT Ltd. Completed Relevant/selected safety recommenda�ons from the Global Ac�on Plan for the Preven�on of Runway Excursions for their relevance against the local condi�ons and specific context have been assessed and implemented. Approach Path Management is not planned.
- 31/12/2023
LSSIP Year 2023 Estonia 72 Working Level Agreed
Annex A: Specialists involved in the ATM implementa�on repor�ng for Estonia
LSSIP Focal Points Organisa�on Name
LSSIP Na�onal Focal Point Estonian Transport Administra�on
Moonika KÄST
LSSIP Focal Point for NSA Estonian Transport Administra�on
Moonika KÄST
LSSIP Focal Point for ANSP Estonian ANS Kei� MERIKÜLL
LSSIP Focal Point for Airport Tallinn Airport Ilona SOITU
LSSIP Focal Point for Military Estonian Defence Forces Air Force
David-Andreas MELLOV
LSSIP Focal point for MET Estonian Environment Agency Jüri JOONAS
Other Focal Points Organisa�on Name
Focal Point for NETSYS EANS (Estonian ANS) Brenda ROOSIMAA
Focal Point for SUR EANS (Estonian ANS) Steve SÕERUER
Focal Point for SDP/CP1 EANS (Estonian ANS) Kei� MERIKÜLL
Focal Point for U-space Estonian Transport Administra�on
Priit RIFK
LSSIP Year 2023 Estonia 73 Working Level Agreed
Annex B: Ques�onnaires
1. Surveillance (SUR) Ques�onnaire This Annex is not published in the LSSIP Document, but is available in the LSSIP Tool, which can be made available upon request to Focal Point and/or Contact Person.
LSSIP Year 2023 Estonia 74 Working Level Agreed
2. EAPAIRR and GAPPRE Ques�onnaire
European Action Plan for Airspace Infringement Risk Reduction
This Annex is not published in the LSSIP Document, but is available in the LSSIP Tool, which can be made available upon request to Focal Point and/or Contact Person.
LSSIP Year 2023 Estonia 75 Working Level Agreed
3. SESAR Solu�ons implemented in a voluntary way3
This Annex is not published in the LSSIP Document, but is available in the LSSIP Tool, which can be made available upon request to Focal Point and/or Contact Person.
3 Referred as ‘Non-committed’ SESAR solutions in the MP L3 Report.
LSSIP Year 2023 Estonia 76 Working Level Agreed
Annex C: Implementa�on Objec�ves’ links with other plans
The table below (extracted from the MPL3 Plan 2023) shows for each implementation objective, the mapping of the L3 implementation Objectives to the corresponding SESAR Essential Operational Changes, the SESAR Solutions, the Deployment Program families, the ICAO ASBU, the EASA EPAS, the Network Strategy Plan, the Airspace Architecture Study Transition Plan (AAS TP) Milestones and the SESAR Key Features.
Level 3
Implementation Objective
SESAR Solution
SDP Family
OI Steps/ Enablers
ICAO ASBUs EPAS NSP AAS TP KF
ATC21 – Composite surveillance ADS- B/WAM
#114 -
CTE-S06, CTE-S05,
CTE-S03a, CTE-S03b, CTE-S04a
ASUR- B0/1
ASUR- B0/2
RMT.067 9
RMT.051 9
SO8/3 SO8/4 AM-1.17 EAI
COM10.2 – Extended AMHS - - CTE-C06c COMI-
B0/7 - SO7/4 - EAI
COM11.1 – Voice over Internet Protocol (VoIP) in En-Route
- - CTE-C05a CTE‐C05b
COMI- B2/1 - SO8/4 AM-1.3 EAI
COM11.2 – Voice over Internet Protocol (VoIP) in Airport/Terminal
- - CTE-C05a CTE‐C05b
COMI- B2/1 - SO8/4 - EAI
COM13 – Air Traffic Services (ATS) datalink using SatCom Class B
#109 - POI-0018- COM
COMI- B1/3 - - AM-1.16 EAI
ITY-ACID – Aircraft identification - - GSURV‐0101 - - SO8/2 - EAI
ITY-AGDL – Initial ATC air-ground data link services
- - AUO-0301
COMI- B0/4
COMI- B1/2
RMT.052 4
SO4/1 SO8/3 AM-1.1 EAI
ITY-AGVCS2 – 8.33 kHz Air-Ground Voice Channel Spacing below FL195
- - CTE-C01a - - SO8/1 - EAI
NAV10 – RNP Approach Procedures to instrument RWY
#103 -
AOM-0602 AOM-0604 CTE-N06a CTE-N06b
APTA- B0/1
APTA- B1/1
NAVS- B0/2
RMT.044 5
RMT.064 3
SO6/5 - AAT S
NAV11.2 – Implement precision approach procedures using GBAS CAT II/III based
#55 - AO-0505-A NAVS- B1/1
RMT.068 2 - - HPA
O
LSSIP Year 2023 Estonia 77 Working Level Agreed
Level 3
Implementation Objective
SESAR Solution
SDP Family
OI Steps/ Enablers
ICAO ASBUs EPAS NSP AAS TP KF
on GPS L1 and/or GALILEO E1
Level 3 Implementation
Objective
SESAR Solution
SDP Family
OI Steps/Enabler
s
ICAO ASBUs EPAS NSP AAS TP KF
AOM13.1 – Harmonise OAT and GAT handling
- - AOM-0301 AOM-0303 - - SO6/2 - OAN
S
AOP11.1 – Initial Airport Operations Plan
#21 2.2.1 AO-0801-A ACDM- B1/1 - SO6/2 - HPA
O
AOP11.2 – Extended Airport Operations Plan
#21 2.2.2
AO-0801-A, AO-0802-A, AO-0803, DCB-0310
ACDM- B1/1 - SO5/2 - HPA
O
AOP17 – Provision/integration of DPI to NMOC
#61 - DCB-0304 NOPS- B0/4 - - - HPA
O
COM12 – NewPENS - - CTE‐C06b COMI- B1/1 -
SO2/3, SO2/4, SO8/3, SO8/4
- EAI
FCM03 – Collaborative flight planning
- - IS-0102 NOPS- B0/2 - SO4/3 AM-1.14 OAN
S
FCM04.2 – Enhanced Short Term ATFCM Measures
#17 4.1.1 DCB-0308 NOPS- B1/1 - SO4/5 AM-1.11 OAN
S
FCM06.1 – Automated Support for Traffic Complexity Assessment and Flight Planning interfaces
#19 PJ.18-
02c 4.3.1
CM-0101 CM-0103-A
IS-0102
NOPS- B0/2
NOPS- B1/4
- SO4/3 SO4/5 AM-1.13 OAN
S
FCM10 – Interactive rolling NOP
#18 #20 4.2.1 DCB-0102
DCB-0208
NOPS- B1/2
NOPS- B1/9
- SO2/2, SO4/2, SO4/5
AM-1.9 AM-1.12
OAN S
FCM11.1 – Initial AOP/NOP Information Sharing
#20 #21 4.2.2 DCB-0103-A
AO-0801-A NOPS- B0/4 -
SO4/4, SO4/5, SO5/2
AM-1.12 OAN S
LSSIP Year 2023 Estonia 78 Working Level Agreed
Level 3 Implementation
Objective
SESAR Solution
SDP Family
OI Steps/Enabler
s
ICAO ASBUs EPAS NSP AAS TP KF
FCM11.2 – AOP/NOP integration
#18 #20 #21
4.4.1
AO-0801–A, AO-0802–A,
AO-0803, DCB-0310,
DCB-0103-A, DCB-0208
NOPS- B1/3 -
SO4/4, SO4/5, SO5/2
AM-1.12 OAN S
INF10.2 – Stakeholders’ SWIM PKI and cyber security
#46 5.2.1 IS-0901-A SWIM- B2/3
RMT.072 0 SO2/4 AM-1.5 EAI
INF10.3 – Aeronautical Information Exchange - Airspace structure service
#46 5.3.1 IS-0901-A - - SO2/4 AM-1.5 EAI
INF10.4 – Aeronautical Information Exchange - Airspace availability service
#46 5.3.1 IS-0901-A - - SO2/4 AM-1.5 EAI
INF10.5 – Aeronautical Information Exchange - Airspace Reservation (ARES) service
#46 5.3.1 IS-0901-A - - SO2/4 AM-1.5 EAI
INF10.6 – Aeronautical Information Exchange - Digital NOTAM service
#34 #46 5.3.1 IS-0901-A
IS-0205 - - SO2/4 AM-1.5 EAI
INF10.7 – Aeronautical Information Exchange - Aerodrome Mapping information exchange service
#34 #46 5.3.1 IS-0901-A
IS-0205 - - SO2/4 AM-1.5 EAI
INF10.8 – Aeronautical Information Exchange - Aeronautical Information Features service
#34 #46 5.3.1 IS-0901-A
IS-0205 - - SO2/4 AM-1.5 EAI
INF10.9 – Meteorological Information Exchange - Volcanic ash concentration service
#34 #35 #46
5.4.1 IS-0901-A IS-0205
MET-0101 - - SO2/4 AM-1.5 EAI
LSSIP Year 2023 Estonia 79 Working Level Agreed
Level 3 Implementation
Objective
SESAR Solution
SDP Family
OI Steps/Enabler
s
ICAO ASBUs EPAS NSP AAS TP KF
INF10.10 – Meteorological Information Exchange - Aerodrome Meteorological information Service
#34 #35 #46
5.4.1 IS-0901-A IS-0205
MET-0101 - - SO2/4 AM-1.5 EAI
INF10.11 – Meteorological Information Exchange - En-Route and Approach Meteorological information service
#34 #35 #46
5.4.1 IS-0901-A IS-0205
MET-0101 - - SO2/4 AM-1.5 EAI
INF10.12 – Meteorological Information Exchange - Network Manager Meteorological Information
#34 #35 #46
5.4.1 IS-0901-A IS-0205
MET-0101 - - SO2/4 AM-1.5 EAI
INF10.13 – Cooperative Network Information Exchange - ATFCM Tactical Updates Service
#46 5.5.1 IS-0901-A - - SO2/4 AM-1.5 EAI
INF10.14 – Cooperative Network Information Exchange - Flight Management Service
#46 5.5.1 IS-0901-A - - SO2/4 SO5/2 AM-1.5 EAI
INF10.15 – Cooperative Network Information Exchange - Measures Service
#46 5.5.1 IS-0901-A - - SO2/4 SO4/5 AM-1.5 EAI
INF10.16 – Cooperative Network Information Exchange - Short Term ATFCM Measures services
#46 5.5.1 IS-0901-A - - SO2/4 SO4/5 AM-1.5 EAI
INF10.17 – Cooperative Network Information Exchange - Counts service
#46 5.5.1 IS-0901-A - - SO2/4 AM-1.5 EAI
INF10.18 – Flight Information Exchange -Filing Service
#46 5.6.1 AUO-0207 FICE- B2/2 - SO2/4 AM-1.5 EAI
INF10.19 – Flight Information Exchange #46 5.6.1 AUO-0207 FICE-
B2/4 - SO2/4 AM-1.5 EAI
LSSIP Year 2023 Estonia 80 Working Level Agreed
Level 3 Implementation
Objective
SESAR Solution
SDP Family
OI Steps/Enabler
s
ICAO ASBUs EPAS NSP AAS TP KF
- Flight Data Request Service
INF10.20 – Flight Information Exchange - Notification Service
#46 5.6.1 AUO-0207 FICE- B2/5 - SO2/4 AM-1.5 EAI
INF10.21 – Flight Information Exchange - Publication Service
#46 5.6.1 AUO-0207 FICE- B2/6 - SO2/4 AM-1.5 EAI
INF10.22 – Flight Information Exchange - Trial Service
#46 5.6.1 AUO-0219 FICE- B2/3 - SO2/4 AM-1.5 EAI
INF10.23 – Flight Information Exchange - Extended AMAN SWIM Service
#46 5.6.1 AUO-0207
DAIM- B2/1
SWIM- B3/1
- SO2/4 AM-1.5 EAI
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
INF07 – Electronic Terrain and Obstacle Data (e-TOD)
- - AIMS-16
DAIM- B1/3
DAIM- B1/4
RMT.070 3
RMT.072 2
SO2/5 - EAI
INF11.1 – Enhanced Ground Weather Management System (GWMS) as local 4DWxCube
PJ.18- 04b-01 - POI-0044-
MET - - - - EAI
INF11.2 – Cb-global capability and service
PJ.18- 04b-02 - POI-0048-
MET - - - - EAI
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
AOP04.1 – A-SMGCS Surveillance Service (former ICAO Level 1)
#70 #110 -
AO-0201 AO-0201-A POI-0071-
SUR
SURF- B0/2
MST.002 9 SO6/6 - HPA
O
LSSIP Year 2023 Estonia 81 Working Level Agreed
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
AOP04.2 – A-SMGCS RMCA (former ICAO Level 2)
- - AO-0102 SURF- B0/3
MST.002 9 SO6/6 - HPA
O
AOP05 – Airport CDM - -
AO-0501, AO-0601, AO-0602, AO-0603, TS-0201
ACDM- B0/1
ACDM- B0/2
NOPS- B0/4
- SO6/4 - HPA O
AOP10 – Time Based Separation #64 - AO-0303 WAKE-
B2/7 - SO6/5 - HPA O
AOP12.1 – Airport Safety Nets #02 2.3.1 AO-0104-A SURF-
B1/3 MST.002
9 SP6/6 - HPA O
AOP13 – Automated assistance to Controller for Surface Movement planning and routing
#22 #53 - AO-0205
TS-0202 SURF- B1/4
MST.002 9 SO6/6 - HPA
O
AOP15 – Safety Nets for vehicle drivers #04 - AO-0105
AO-0204 SURF- B2/2
MST.002 9 - - HPA
O
AOP16 – Guidance assistance through airfield lighting
#47 - AO-0222-A SURF- B1/1
MST.002 9 - - HPA
O
AOP18 – Runway Status Lights #01 - AO-0209
SURF- B2/2, SURF- B2/3-
MST.002 9 - - HPA
O
AOP19 – Departure Management Synchronised with Pre-departure sequencing
#53 #106 2.1.1 AO-0602
TS-0201 RSEQ- B0/2 - - - HPA
O
AOP20 – Wake Turbulence Separations for Departures based on Static Aircraft Characteristics (S- PWS-D)
PJ.02-01- 06 - AO-0323 - RMT.047
6 - - HPA O
AOP21 – Wake Turbulence Separations for Arrivals based on Static Aircraft Characteristics (S- PWS-A)
PJ.02-01- 04 - AO-0306 WAKE-
B3/3 RMT.047
6 - - HPA O
LSSIP Year 2023 Estonia 82 Working Level Agreed
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
AOP22 – Minimum pair separations based on SRP
PJ.02-03 - AO-0309 - - - - HPA O
AOP23 – Integrated runway sequence for full traffic optimization on single and multiple runway airports
PJ.02-08- 01 - TS-0301 RSEQ-
B2/1 - - - HPA O
AOP24 – Optimised use of runway configuration for multiple runway airports
PJ.02-08- 02 - TS-0313 - - - - HPA
O
AOP25 – De-icing Management Tool #116 - POI-0070-
AO - - - - HPA O
AOP26 – Reduced separation based on local Runway Occupancy Time (ROT) characterisation
PJ.02-08- 03 - AO-0337 - - - - HPA
O
ATC07.1 – Arrival management tools - - TS-0102 RSEQ-
B0/1 - SO4/1 - AAT S
ATC19 – Enhanced AMAN-DMAN integration
#54 1.2.1 TS-0308 RSEQ- B2/1 - SO6/5
SO4/1 - EAI
ATC26 – Point Merge in complex TMA #107 - AOM-0601 RSEQ-
B0/3 - - - AAT S
ENV01 – Continuous Descent Operations #11 -
AOM-0701 AOM-0702-
A
APTA- B0/4
APTA- B1/4
- SO6/5 - AAT S
ENV02 – Airport Collaborative Environmental Management
- - AO-0703, AO-0705, AO-0706
- - - - HPA O
ENV03 – Continuous Climb Operations - - AOM-0703
APTA- B0/5
APTA- B1/5
- SO6/5 - AAT S
NAV03.1 – RNAV1 in TMA Operations #62 - AOM-0601
CTE-N08 APTA- B0/2
RMT.044 5 SO6/5 - AAT
S
NAV03.2 – RNP1 in TMA Operations #09 - AOM-0603
AOM-0605 APTA- B1/2
RMT.044 5 SO6/5 - AAT
S
LSSIP Year 2023 Estonia 83 Working Level Agreed
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
#51 PJ.14-03-
04
POI-0032- NAV
NAV11.1 – GLS CAT II operations using GBAS GAST-C
#119 - AO-0506 NAVS- B1/1
RMT.068 2
RMT.379 - - HPA
O
SAF11.1 – Improve runway safety by preventing runway excursions
- - - - - - - HPA O
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
AOM19.4 – Management of Pre- defined Airspace Configurations
#31 #66 3.1.2
AOM-0202- A
AOM-0206- A
CM-0102-A
FRTO- B1/4, NOPS- B1/6
- SO3/2 SO3/3
AM-1.10 AM-1.8-
OAN S
AOM19.5 – ASM and A-FUA
#31 #66 3.1.1
AOM-0202 AOM-0202-
A AOM-0206-
A
NOPS B1/5, NOPS B0/1, FRTO B1/3, FRTO B0/2
- SO3/2 SO3/3
AM-1.10 AM-1.8
OAN S
AOM21.2 – Initial Free Route Airspace
#32 #33 #66
3.2.1 AOM-0501 AOM-0505 CM-0102-A
FRTO- B1/1 - SO3/1
SO3/4 AM-1.10 AM-5.1
AAT S
AOM21.3 – Enhanced Free Route Airspace Operations
#33 PJ.06-01 3.2.2 AOM-0501
AOM-0505 FRTO- B2/3 - SO3/1
SO3/4 AM-1.6 AM-1.7
AAT S
ATC12.1 – MONA, TCT and MTCD
#27 #104 -
CM-0202, CM-0203, CM-0205,
CM-0207-A
FRTO- B0/4
FRTO- B1/5
- SO3/1 SO4/1
AM-1.15 AM-5.1
AAT S
ATC15.1 – Initial Extension of AMAN to En-route
- - TS-0305 - - SO4/1 - AAT S
ATC15.2 – Arrival Management #05 1.1.1 TS-0305-A RSEQ-
B1/1 - SO4/1 AM-1.3 AAT S
LSSIP Year 2023 Estonia 84 Working Level Agreed
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
Extended to En-route Airspace
NOPS- B1/8
ATC18 – Multi Sector Planning En-route – 1P2T
#63 #118
- CM-0301 FRTO-
B1/6 - SO4/1 AM-4.3 AM-5.1
AAT S
ITY-FMTP – Apply a common flight message transfer protocol (FMTP)
- - CTE-C06 - - SO8/3 AM-1.3 EAI
SAF10.1 – Implement measures to reduce the risk to aircraft operations caused by airspace infringements
- - - - SI.2025 - - AAT S
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
ATC02.8 – Ground based safety nets - - CM-0801
SNET- B0/2 SNET- B0/3 SNET- B0/4
- SO4/1 - AAT S
ATC20 – Enhanced STCA with DAP via Mode S EHS
#69 - CM-0807-A SNET- B1/1
MST.003 0 SO7/2 - AAT
S
ATC22 – Initial Air- Ground Trajectory Information Sharing (Airborne Domain)
#115 6.1.1 IS-0303-A - RMT.068 2 SO4/5 AM-1.2 EAI
ATC23 – Initial Air- Ground Trajectory Information Sharing (Ground Domain)
#115 PJ.18- 06b1
6.1.2 IS-0303-A - RMT.068 2 SO4/5 AM-1.2 EAI
ATC24 – Network Manager Trajectory Information Enhancement
PJ.18- 06b1 6.2.1 POI-0011-IS
POI-0013-IS - RMT.068 2 SO4/5 - EAI
ATC25 – Initial Trajectory #115 6.3.1 IS-0303-A - MST.003
1 AM-1.2 EAI
LSSIP Year 2023 Estonia 85 Working Level Agreed
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
Information Sharing ground distribution
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
NAV12 – ATS IFR Routes for Rotorcraft Operations
#113 - AOM-0810 APTA- B0/6
MST.003 1 SO6/5 - AAT
S
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
- - - - - - - - -
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
AOP14.1 – Remote Tower Services
#12 #13 #52 #71 -
SDM-0201 SDM-0204 SDM-0205
RATS- B1/1
RMT.062 4 SO6/5 - HPA
O
AOP14.2 – Multiple Remote Tower Module
PJ.05-02 - SDM-0207 RATS- B1/1
RMT.062 4 SO6/5 - HPA
O
LSSIP Year 2023 Estonia 86 Working Level Agreed
Annex D: Na�onal stakeholders organisa�on charts
Structure of Estonian Transport Administration
LSSIP Year 2023 Estonia 87 Working Level Agreed
Structure of EANS
LSSIP Year 2023 Estonia 88 Working Level Agreed
Structure of AS Tallinna Lennujaam
LSSIP Year 2023 Estonia 89 Working Level Agreed
Structure of MET
LSSIP Year 2023 Estonia 90 Working Level Agreed
Structure of MIL
LSSIP Year 2023 Estonia 91 Working Level Agreed
Annex E: Glossary of Terms
This Annex mainly shows the abbreviations that are specific to the LSSIP Document for Estonia.
Other general abbreviations are in the Acronyms and Abbreviations document in:
https://www.eurocontrol.int/airial/
Term Description
AF ATM Functionality
EANS Estonian Air Navigation Services (Estonian ANS)
ESTEA Estonian Environment Agency
LOF Log-On Forwarding message
NAMCON The Northern Europe Aviation Meteorology Consortium
NAN Next Authority Notified message
NEFAB North European Functional Airspace Block
NEFRA North European Free Route Airspace
NSA National Supervisory Authority
rAFIS Remote AFIS
rTWR Remote TWR
LSSIP 2023_WLA_EE Final Audit Report 2024-04-15
Created: 2024-04-11
By: Moonika Käst (moonika.kast@transpordiamet.ee)
Status: Signed
Transaction ID: CBJCHBCAABAAps3iHTQFh1AO4MazHVthwhYDl2rsx_UZ
"LSSIP 2023_WLA_EE" History Document created by Moonika Käst (moonika.kast@transpordiamet.ee) 2024-04-11 - 7:41:38 AM GMT
Document emailed to null TRAM (yllar.salumae@transpordiamet.ee) for signature 2024-04-11 - 7:43:18 AM GMT
Document emailed to null EANS (ivar.vark@eans.ee) for signature 2024-04-11 - 7:43:18 AM GMT
Document emailed to null KAUR (taimar.ala@envir.ee) for signature 2024-04-11 - 7:43:19 AM GMT
Document emailed to AS TLL (riivo.tuvike@tll.aero) for signature 2024-04-11 - 7:43:19 AM GMT
Document emailed to null MIL (david-andreas.mellov@mil.ee) for signature 2024-04-11 - 7:43:19 AM GMT
Email viewed by null TRAM (yllar.salumae@transpordiamet.ee) 2024-04-11 - 7:52:55 AM GMT
Signer null TRAM (yllar.salumae@transpordiamet.ee) entered name at signing as Üllar Salumäe 2024-04-11 - 7:53:56 AM GMT
Document e-signed by Üllar Salumäe (yllar.salumae@transpordiamet.ee) Signature Date: 2024-04-11 - 7:53:58 AM GMT - Time Source: server
Email viewed by null MIL (david-andreas.mellov@mil.ee) 2024-04-11 - 8:09:56 AM GMT
Document signing delegated to Pirje Reede, käsundusallohvitser (pirje.reede@mil.ee) by null MIL (david- andreas.mellov@mil.ee) 2024-04-11 - 8:12:46 AM GMT
Document emailed to Pirje Reede, käsundusallohvitser (pirje.reede@mil.ee) for signature 2024-04-11 - 8:12:46 AM GMT
Email viewed by null EANS (ivar.vark@eans.ee) 2024-04-11 - 10:05:41 AM GMT
Signer null EANS (ivar.vark@eans.ee) entered name at signing as Ivar Värk, CEO EANS 2024-04-11 - 10:08:23 AM GMT
Document e-signed by Ivar Värk, CEO EANS (ivar.vark@eans.ee) Signature Date: 2024-04-11 - 10:08:25 AM GMT - Time Source: server
Email viewed by Pirje Reede, käsundusallohvitser (pirje.reede@mil.ee) 2024-04-11 - 11:21:18 AM GMT
Document signing delegated to Toomas Susi (toomas.susi@mil.ee) by Pirje Reede, käsundusallohvitser (pirje.reede@mil.ee) 2024-04-11 - 11:28:01 AM GMT
Document emailed to Toomas Susi (toomas.susi@mil.ee) for signature 2024-04-11 - 11:28:01 AM GMT
Email viewed by Toomas Susi (toomas.susi@mil.ee) 2024-04-11 - 11:28:27 AM GMT
Document e-signed by Toomas Susi (toomas.susi@mil.ee) Signature Date: 2024-04-11 - 11:29:10 AM GMT - Time Source: server
Email viewed by AS TLL (riivo.tuvike@tll.aero) 2024-04-15 - 1:25:58 PM GMT
Signer AS TLL (riivo.tuvike@tll.aero) entered name at signing as Riivo Tuvike 2024-04-15 - 1:31:49 PM GMT
Document e-signed by Riivo Tuvike (riivo.tuvike@tll.aero) Signature Date: 2024-04-15 - 1:31:51 PM GMT - Time Source: server
Email viewed by null KAUR (taimar.ala@envir.ee) 2024-04-15 - 1:39:37 PM GMT
Signer null KAUR (taimar.ala@envir.ee) entered name at signing as Taimar Ala 2024-04-15 - 1:44:21 PM GMT
Document e-signed by Taimar Ala (taimar.ala@envir.ee) Signature Date: 2024-04-15 - 1:44:23 PM GMT - Time Source: server
Agreement completed. 2024-04-15 - 1:44:23 PM GMT
LSSIP Year 2023 Estonia Working Level Agreed
LSSIP Year 2023 Estonia Working Level Agreed
Foreword
The EUROCONTROL Local Single Sky Implementa�on (LSSIP) is a long-standing process celebra�ng its 30th anniversary. Its main goal is to improve the overall streamlined planning process in avia�on and in ATM, allowing avia�on stakeholders to deploy the agreed set of technological and infrastructure evolu�ons in a �mely manner and put the new func�onali�es into opera�ons in an orchestrated way across Europe.
The usage of the common LSSIP+ tool to gather data from the ATM stakeholders is a very good showcase of our collec�ve efforts, EUROCONTROL and SDM, in advancing the European ATM Network in support of our opera�onal stakeholders, moving towards the single value chain.
The LSSIP process is con�nuously improving the planning and repor�ng accuracy and consistency. It ensures the regular monitoring of the implementa�on of all func�onali�es.
The opera�onal stakeholders are facing the challenges of traffic growth, capacity and constantly increasing sustainability requirements. The need to maintain a process and pla�orm for the European avia�on community which provides a visibility of their plans and progress within the agreed �meline is stronger than ever. The con�nuous engagement in the LSSIP process shows the commitment towards a robust unified planning and monitoring process of the European ATM modernisa�on.
The na�onal LSSIP documents not only provide a unified view of the plans and progress of implementa�on at both Na�onal and ECAC levels. They also form the core of the ICAO’s Avia�on System Block Upgrades (ASBUs) Implementa�on Monitoring Report within the ICAO EUR Region. Developed by EUROCONTROL on behalf of ICAO, it is based on the reported LSSIP data for all 55 ICAO/EUR States and informs at global level about the European progress of implementa�on of the Global Air Naviga�on Plan (GANP).
Moreover, star�ng this year, the EUR RASP ques�onnaire, a joint effort between the ICAO EUR Office and EASA, directly supported by EUROCONTROL, has been officially incorporated into the LSSIP mechanism, thereby enhancing the collabora�on between our organisa�ons.
I would like to thank all our stakeholders for their con�nued commitment and significant effort in contribu�ng to the LSSIP process, the produc�on of this LSSIP document and in suppor�ng EUROCONTROL towards our goal of diligently guiding and informing the Avia�on community on ATM deployment.
Enjoy reading! Iacopo Prissinotti Director NM - Network Manager EUROCONTROL
LSSIP Year 2023 Estonia Working Level Agreed
SESAR Deployment Manager Lookout
This document serves as a testament to our collec�ve efforts in advancing the European ATM Network, and a roadmap for the challenges that lie ahead. We can truly state that this is the result of ac�ng as one team for the modernisa�on of European avia�on.
The SESAR Deployment Programme progress informa�on, collected through the LSSIP+ tool, via the unified monitoring and repor�ng process is a cornerstone of this document and at the same �me directly supports the delivery of the SESAR Deployment Programme Monitoring View 2023.
This drives the re-direc�on of our work at SDM to guide and support the opera�onal stakeholders in their implementa�on efforts of CP1 to make sure the ATM industry is able to achieve the target goals. It gives SDM, since the first edi�on of the Monitoring View in 2015, the opportunity to iden�fy implementa�on risks and beter support stakeholders to accelerate deployment.
I would like to extend my gra�tude to all European organisa�ons involved and contribu�ng with data in LSSIP+ tool. As it is only through stakeholders' coopera�on, efforts and partnerships' spirit that we will keep pushing deployment forward within the European skies, avoiding delays in the adop�on of CP1 and building an ATM industry that can overcome the challenges of the upcoming years.
The two CP1 regulatory target deadlines already surpassed, and the approaching ones, underscore the urgency of our mission to beter support stakeholders to accelerate deployment. The significant progress achieved in the status of its implementa�on is living proof for the joint effort of ATM stakeholders throughout Europe.
Those deadlines serve as a reminder that our work is not just about mee�ng regulatory requirements, but about shaping the future of avia�on in Europe. Every objec�ve we complete, every milestone we achieve, brings us one step closer to that future.
As you dive into this document and SDP Monitoring View 2023, we hope it provides you with a clear understanding of our common journey so far and the path that lies ahead. We look forward to naviga�ng these challenges together, driven by our shared commitment to a safer, more efficient, and sustainable European sky. Mariagrazia La Piscopia Chief Strategy and Programme SESAR Deployment Manager
LSSIP Year 2023 Estonia Working Level Agreed
Document Title LSSIP Year 2023 for Estonia
Info Centre Reference <XX> (LSSIP Support)
Date of Edi�on <Date>
LSSIP Focal Point Moonika Käst – moonika.kast@transpordiamet.ee Estonian Transport Administra�on
LSSIP Contact Person Luca Dell’Orto – luca.dellorto@eurocontrol.int EUROCONTROL/NMD/INF/PAS
LSSIP Support Team lssip.support@eurocontrol.int
Status Ini�al Dra�
Intended for EUROCONTROL Stakeholders
Available in htps://www.eurocontrol.int/service/local-single-sky-implementa�on- monitoring
Reference Documents
LSSIP Documents htps://www.eurocontrol.int/service/local-single-sky-implementa�on- monitoring
Master Plan Level 3 – Plan Edi�on 2023
htps://www.eurocontrol.int/publica�on/european-atm-master-plan- implementa�on-plan-level-3
Master Plan Level 3 – Report Year 2023
htps://www.eurocontrol.int/publica�on/european-atm-master-plan- implementa�on-report-level-3
European ATM Portal htps://www.atmmasterplan.eu/
STATFOR Forecasts htps://www.eurocontrol.int/sta�or
Na�onal AIP https://aim.eans.ee
LSSIP Year 2023 Estonia Working Level Agreed
Approval Sheet
The following authorities have approved all parts of the LSSIP Year 2023 document, and the signatures confirm the correctness of the reported information and reflect the commitment to implement the actions laid down in the European ATM Master Plan Level 3 (Implementation View) – Edition 2023.
Stakeholder / Organisation
Name Position Signature and date
Estonian Transport Administration
Üllar Salumäe Director of Aviation Division
Estonian Air Naviga�on Services
Ivar Värk Chairman of Management Board and CEO
Estonian Air Force Toomas Susi
Active Commander of the Estonian Air Force Brigadier General
AS Tallinna Lennujaam Riivo Tuvike Chairman of Management Board
Estonian Environment Agency
Taimar Ala Director General
Üllar Salumäe (Apr 11, 2024 10:53 GMT+3) Üllar Salumäe
Ivar Värk, CEO EANS (Apr 11, 2024 13:08 GMT+3)
Toomas Susi (Apr 11, 2024 14:29 GMT+3) Toomas Susi
Riivo Tuvike (Apr 15, 2024 16:31 GMT+3) Riivo Tuvike
Taimar Ala (Apr 15, 2024 16:44 GMT+3) Taimar Ala
LSSIP Year 2023 Estonia Working Level Agreed
Table of Contents
EXECUTIVE SUMMARY ........................................................................................................................................ 1
HIGH LEVEL STATS DASHBOARD ........................................................................................................................................ 1 TRAFFIC AND CAPACITY ................................................................................................................................................... 2 IMPLEMENTATION SUMMARY ........................................................................................................................................... 3
Summary of the implementation of the objectives ............................................................................................... 3 Other 2023 developments: .................................................................................................................................... 3
INTRODUCTION .................................................................................................................................................. 4
1 NATIONAL IMPLEMENTATION VIEW ............................................................................................................. 5
1.1 NATIONAL ATM SCOPE ...................................................................................................................................... 5 International Membership .................................................................................................................................... 5 Estonia is part of: .................................................................................................................................................. 5 Main National Stakeholders .................................................................................................................................. 6
1.2 IMPLEMENTATION VIEWS .................................................................................................................................... 7 Progress per SESAR Phase ..................................................................................................................................... 7 Progress per SESAR Essential Operational Changes and Phase............................................................................. 8 Objective Progress per SESAR Essential Operational Changes .............................................................................. 9 ICAO ASBU Implementation Progress – Blocks 0 and 1 ....................................................................................... 13 ICAO ASBU Implementation Progress .................................................................................................................. 14 Overall situation of Implementation Objectives .................................................................................................. 18
TRAFFIC AND CAPACITY .................................................................................................................................... 24
1.3 NATIONAL ATM STRUCTURE ............................................................................................................................. 24 Geographical description of the FIR(s) ................................................................................................................ 24 Airspace Classification and Organisation ............................................................................................................ 25
EVOLUTION OF TRAFFIC IN ESTONIA ................................................................................................................................ 26 TALLINN ACC.............................................................................................................................................................. 27
Traffic and en-route ATFM delays 2019-2029 ..................................................................................................... 27 2023 performance ............................................................................................................................................... 27 Planning Period – Summer 2024-2029 ................................................................................................................ 28
2 NATIONAL ATM ENVIRONMENT ................................................................................................................ 30
MAIN NATIONAL STAKEHOLDERS .................................................................................................................................... 30 Civil Regulator(s) ................................................................................................................................................. 30 Airports ................................................................................................................................................................ 33 Meteorological Service Providers ........................................................................................................................ 34 Military Authorities ............................................................................................................................................. 34
3 IMPLEMENTATION PROJECTS ..................................................................................................................... 38
3.1 NATIONAL PROJECTS ......................................................................................................................................... 38 3.2 FAB PROJECTS ................................................................................................................................................. 39 3.3 MULTINATIONAL PROJECTS ................................................................................................................................ 39
4 COOPERATION ACTIVITIES ......................................................................................................................... 40
4.1 FAB COORDINATION ........................................................................................................................................ 40 4.2 MULTINATIONAL COOPERATION INITIATIVES ......................................................................................................... 40
LSSIP Year 2023 Estonia Working Level Agreed
5 DETAILED OBJECTIVES IMPLEMENTATION PROGRESS ................................................................................. 42
Main Objectives ................................................................................................................................................... 42 Additional Objectives for ICAO ASBU Monitoring ............................................................................................... 64 Local Objectives ................................................................................................................................................... 66
ANNEX A: SPECIALISTS INVOLVED IN THE ATM IMPLEMENTATION REPORTING FOR ESTONIA ............................. 72
ANNEX B: QUESTIONNAIRES ............................................................................................................................. 73
1. SURVEILLANCE (SUR) QUESTIONNAIRE ..................................................................................................................... 73 2. EAPAIRR AND GAPPRE QUESTIONNAIRE ................................................................................................................. 74 3. SESAR SOLUTIONS IMPLEMENTED IN A VOLUNTARY WAY .............................................................................................. 75
ANNEX C: IMPLEMENTATION OBJECTIVES’ LINKS WITH OTHER PLANS ............................................................... 76
ANNEX D: NATIONAL STAKEHOLDERS ORGANISATION CHARTS ............................................................................. 86
ANNEX E: GLOSSARY OF TERMS ........................................................................................................................ 91
LSSIP Year 2023 Estonia 1 Working Level Agreed
Execu�ve Summary
High Level Stats dashboard
LSSIP Year 2023 Estonia 2 Working Level Agreed
Traffic and Capacity
Level of traffic compared to 2019.
Summer En-Route Delay Tallinn ACC
Forecast between 2024-2029
2022 2023 N/A
65%
2.7% 2024-2029
LSSIP Year 2023 Estonia 3 Working Level Agreed
Implementation Summary
Summary of the implementa�on of the objec�ves
The introduc�on of a new Voice Communica�on System was a major project, which was finalised by the first half of 2023 and contributed to the comple�on of Objec�ves COM11.1 and COM11.2.
The Objec�ve FCM04.2 Enhanced Short Term ATFCM Measures was fully completed.
All the SWIM related Objec�ves are planned or ongoing, but there are foreseen delays in implementa�on due to complex ATM systems. Nevertheless, in 2023 several AIS ac�vi�es were carried out, which contribute to the implementa�on of digital NOTAM Service. EANS is also par�cipa�ng in project ACADIA (Accelera�on of Aeronau�cal Digital Informa�on Availability) to ensure accordance.
ITY-ACID Aircra� Iden�fica�on is s�ll ongoing with an implementa�on date later than the FOC date due to a delay of neighbouring ANSP-s implementa�on plans.
The local Objec�ve AOP14.1 Remote Tower Services first stage was fully implemented and is envisaged to be completed for the next aerodrome (EEKE) by 2024.
Other 2023 developments:
- Installation of new meteorological systems at EEKA, EEKE, EETN and EETU AD is finished. Certification process is ongoing.
- Implementation of CAT II at Tallinn Airport is ongoing. - Changes in governmental system. Estonian Transport Administration and Environment
Agency moved into area of Ministry of Climate.
Implemen�ng progress of AOM13.1, INF07 has gone very slowly due to constant lack of human resources in Estonian Transport Administra�on.
LSSIP Year 2023 Estonia 4 Working Level Agreed
Introduc�on
The Local Single Sky ImPlementa�on (LSSIP) documents, as an integral part of the Master Plan (MP) Level 3 (L3)/LSSIP mechanism, cons�tute a short/medium term implementa�on plan containing ECAC+ States’ ac�ons to achieve the Implementa�on Objec�ves as set out by the MP Level 3 and to improve the performance of their na�onal ATM System. This LSSIP document describes the situa�on in the State at the end of December 2023, together with plans for the next years.
Chapter 1 provides an overview of the na�onal ATM scope within the State, which is relevant for the implementa�on ac�vi�es, as well as an overview of the planning ac�vi�es by providing different charts on the progress reported by the different stakeholders.
Chapter 2 provides a comprehensive picture of the situa�on of Air Traffic, Capacity and ATFM Delay per each ACC in the State. It shows the evolu�on of Air Traffic and Delay in the last five years and the forecast for the next five years. It also presents the achieved performance in terms of delay during the summer season period and the planned projects assumed to offer the required capacity which will match the foreseen traffic increase and keep the delay at the agreed performance level.
Chapter 3 provides an overview of the ATM ins�tu�onal arrangements within the State. Chapter 4 provides the main Implementa�on Projects which contribute directly to the implementa�on of the MP Opera�onal Improvements and/or Enablers and Implementa�on Objec�ves. The LSSIP document covers a high-level list of the projects showing the applicable links. All other details like descrip�on, �mescale, progress made and expected contribu�on to the ATM Key Performance Areas provided by the State per each project are available in the LSSIP DB (extrac�on can be asked to LSSIP FP or LSSIP CP).
Chapter 5 deals with other coopera�on ac�vi�es beyond Implementa�on Projects. It provides an overview of the FAB coopera�on, as well as all other mul�na�onal ini�a�ves, which are out of the FAB scope. The content of this chapter generally is developed and agreed in close coopera�on between the States concerned.
Chapter 6 provides the high-level informa�on on progress and plans of each Implementa�on Objec�ve. The informa�on for each Implementa�on Objec�ve is presented in boxes giving a summary of the progress and plans of implementa�on for each Stakeholder. The conven�ons used are presented at the beginning of the sec�on.
The information contained in Chapter 6 – Implementation Objectives Progress is deemed sufficient to satisfy State reporting requirements towards ICAO in relation to ASBU (Aviation System Block Upgrades) monitoring.
LSSIP Year 2023 Estonia 5 Working Level Agreed
1 Na�onal Implementa�on View
1.1 Na�onal ATM Scope
Interna�onal Membership
Estonia is a member of the following interna�onal organisa�ons in the field of ATM:
Organisa�on Since Organisa�on Since
2015
2004
1995
2004
1992
2004
2004
1992
1992
Estonia is part of: The North European Func�onal Airspace Block (NEFAB).
In 2023 the GDP decreased by 3,5%, the forecast for 2024 is about 0,4% of deficiency. Main airport covered by LSSIP: EETN AD.
Number of national projects: 4 Number of FAB projects: NIL Number of multinational projects: 3
LSSIP Year 2023 Estonia 6 Working Level Agreed
Main Na�onal Stakeholders
The main National Stakeholders involved in ATM in Estonia are the following:
- Ministry of Climate;
- Ministry of Economic Affairs and Communica�ons;
- Ministry of Defence;
- Estonian Transport Administration;
- Estonian Air Navigation Services (EANS);
- Estonian Environment Agency;
- Estonian Defence Forces Air Force;
- AS Tallinna Lennujaam.
Their activities are detailed in the following subchapters and their relationships are shown in the diagram below.
LSSIP Year 2023 Estonia 7 Working Level Agreed
1.2 Implementa�on Views
Progress per SESAR Phase
The figure below shows the progress made so far in the implementation of objectives stemming from different R&D phases (Pre-SESAR, SESAR1 and SESAR 2020).
It shows the average implementation progress for all objectives grouped by SESAR Phase, excluding those for which the State is outside the applicability area as defined on a yearly basis in the European ATM Master Plan (Level 3) 2023, i.e., disregarding the declared “NOT APPLICABLE” LSSIP progress status.
Source: EUROCONTROL LSSIP+ DB
LSSIP Year 2023 Estonia 8 Working Level Agreed
Progress per SESAR Essen�al Opera�onal Changes and Phase
The figure below shows the progress made so far, per SESAR Essential Operational Changes, in the implementation of the SESAR phases. The percentages are calculated as an average, per EOC, of the same objectives as in the previous paragraph.
Source: EUROCONTROL LSSIP+ DB
LSSIP Year 2023 Estonia 9 Working Level Agreed
Objec�ve Progress per SESAR Essen�al Opera�onal Changes
LSSIP Year 2023 Estonia 10 Working Level Agreed
No implementa�on objec�ves are available yet for this EOC.
LSSIP Year 2023 Estonia 11 Working Level Agreed
LSSIP Year 2023 Estonia 12 Working Level Agreed
No implementa�on objec�ves are available yet for this EOC. Source: EUROCONTROL LSSIP+ DB
LSSIP Year 2023 Estonia 13 Working Level Agreed
ICAO ASBU Implementa�on Progress – Blocks 0 and 1
The figure below shows the progress made so far in the implementation of the ICAO ASBU Blocks 0 and 1, according to ICAO Global Air Navigation Plan 7th Edition (2022). The overall percentage is calculated as an average of the relevant Objectives contributing to each of the relevant ASBU Blocks; this is a summary of the table explained on the next page – ICAO ASBU Implementation Progress.
Source: EUROCONTROL LSSIP+ DB
LSSIP Year 2023 Estonia 14 Working Level Agreed
ICAO ASBU Implementa�on Progress
The tables below show for each ASBU Elements belonging to a particular ASBU Thread and Block, the overall status, the final date foreseen for completion and the percentage of progress achieved in the current cycle.
The set of Block 0 and Block 1 ASBU elements to be monitored in ICAO EUR Region has been approved through written consultation by European Aviation System Planning Group (EASPG) in April 2021, based on the conclusions of the EUR Global Air Navigation Plan (GANP) Transition Project Team. The set of monitored Elements has been subsequently amended following the publication of the 7th version of the GANP, endorsed in October 2022.
Results below were determined using the LSSIP Year 2023 declared statuses and progress of the relevant Implementation objectives in accordance with the updated mapping.
Note: Only the ASBU elements that are linked to an active implementation Objective are shown
Source: EUROCONTROL LSSIP+ DB
LSSIP Year 2023 Estonia 15 Working Level Agreed
ATM Deployment Outlook
State Objec�ves
Deployed in 2023
- Interac�ve Rolling NOP
[FCM10] 100 % progress
- Improve Runway Safety by Preven�ng Runway Excursions
[SAF11.1] 100 % progress
- Collabora�ve Flight Planning
[FCM03] 100 % progress
- Voice over Internet Protocol (VoIP) in En-Route
[COM11.1] 100 % progress
- Voice over Internet Protocol (VoIP) in Airport/Terminal
[COM11.2] 100 % progress
- Enhanced Short Term ATFCM Measures
[FCM04.2] 100 % progress
- Automated Support for Traffic Complexity Assessment and Flight Planning interfaces
[FCM06.1] 100 % progress
By 2024
- Aeronau�cal Informa�on Exchange - Airspace Reserva�on (ARES)
[INF10.5] 3 % progress
- Harmonise Opera�onal Air Traffic (OAT) and General Air Traffic (GAT) Handling
[AOM13.1] 56 % progress
- Aircra� Iden�fica�on
[ITY-ACID] 92 % progress
Source: EUROCONTROL LSSIP+ DB
LSSIP Year 2023 Estonia 16 Working Level Agreed
By 2025
- Aeronau�cal Informa�on Exchange - Aerodrome mapping service
[INF10.7] 0 % progress
- Aeronau�cal Informa�on Exchange - Aeronau�cal Informa�on Features service
[INF10.8] 8 % progress
- Meteorological Informa�on Exchange - Aerodrome Meteorological informa�on Service
[INF10.10] 47 % progress
- Electronic Terrain and Obstacle Data (eTOD)
[INF07] 6 % progress
- Stakeholders’ SWIM PKI and cyber security
[INF10.2] 13 % progress
- Meteorological Informa�on Exchange - Network Meteorological Informa�on
[INF10.12] 0 % progress
- Aeronau�cal Informa�on Exchange – Digital NOTAM service
[INF10.6] 64 % progress
- Meteorological Informa�on Exchange - Volcanic Ash Mass Concentra�on informa�on service
[INF10.9] 3 % progress
- Meteorological Informa�on Exchange - En-Route and Approach Meteorological informa�on service
[INF10.11] 5 % progress
Source: EUROCONTROL LSSIP+ DB
By 2027+
- Flight Informa�on Exchange (Yellow Profile) - Data Publica�on Service
[INF10.21] 0 % progress
- Flight Informa�on Exchange (Yellow Profile) - No�fica�on Service
[INF10.20] 0 % progress
- Implement measures to reduce the risk to aircra� opera�ons caused by airspace infringements
[SAF10.1] 30 % progress
- Flight Informa�on Exchange (Yellow Profile) - Flight Data Request Service
[INF10.19] 0 % progress
Source: EUROCONTROL LSSIP+ DB
Airport Objec�ves Tallinn Airport
Deployed in 2023
- Con�nuous Descent Opera�ons (CDO)
[ENV01] 100 % progress
LSSIP Year 2023 Estonia 17 Working Level Agreed
By 2024
- Remote Tower Services
[AOP14.1] 40 % progress
- RNAV 1 in TMA Opera�ons
[NAV03.1] 97 % progress
Source: EUROCONTROL LSSIP+ DB
By 2027+
- Airport Collabora�ve Decision Making (A-CDM)
[AOP05] 1 % progress
Source: EUROCONTROL LSSIP+ DB
LSSIP Year 2023 Estonia 18 Working Level Agreed
Overall situa�on of Implementa�on Objec�ves
Main Objec�ves Topic Progress at the end of
2023 Status 2023 2024 2025 2026 2027 2028
2029 >2029
AOM13.1 Harmonise Opera�onal Air Traffic (OAT) and General Air Traffic (GAT) Handling
56% Ongoing
AOM19.4 Management of Predefined Airspace Configura�ons
100% Completed
AOM19.5 ASM and A-FUA 100% Completed AOM21.1 Direct Rou�ng 0% Not Applicable AOM21.2 Ini�al Free Route Airspace 100% Completed AOM21.3 Enhanced Free Route Airspace Opera�ons 100% Completed *
AOP04.1(EETN) Advanced Surface Movement Guidance and Control System A-SMGCS Surveillance
Service (former ICAO Level 1)
100% Completed
AOP04.2(EETN) Advanced Surface Movement Guidance and Control System (A-SMGCS) Runway Monitoring and Conflict Aler�ng (RMCA) (Airport Safety Support Service = former
ICAO Level 2)
100% Completed *
AOP05(EETN) Airport Collabora�ve Decision Making (A- CDM)
1% Ongoing
AOP10(EETN) Time-Based Separa�on 0% Not Applicable * AOP11.1(EETN) Ini�al Airport Opera�ons Plan 0% Not Applicable * AOP11.2(EETN) Extended Airport Opera�ons Plan 0% Not Applicable * AOP12.1(EETN) Airport Safety Nets 0% Not Applicable * AOP13(EETN) Automated Assistance to Controller for
Surface Movement Planning and Rou�ng 0% Not Applicable *
AOP14.1(EETN) Remote Tower Services 40% Ongoing 2030 AOP15 Enhanced traffic situa�onal awareness
and airport safety nets for the vehicle drivers
0% Not Applicable 2030
AOP16 Guidance assistance through airfield ground ligh�ng
0% Not Applicable 2030
LSSIP Year 2023 Estonia 19 Working Level Agreed
Main Objec�ves Topic Progress at the end of
2023 Status 2023 2024 2025 2026 2027 2028
2029 >2029
AOP17 Provision/integra�on of departure planning informa�on to NMOC
0% Not Applicable 2030
AOP18 Runway Status Lights (RWSL) 0% Not Applicable 2030 AOP19(EETN) Departure Management Synchronised
with Pre-departure sequencing 0% Not Applicable
AOP21 Wake Turbulence Separa�ons for Arrivals based on Sta�c Aircra� Characteris�cs (S-
PWS-A)
0% Not Applicable 2030
AOP23(EETN) Integrated runway sequence for full traffic op�miza�on on single and mul�ple
runway airports
0% Not yet planned 2030
AOP25(EETN) De-icing management tool 0% Not yet planned 2030 AOP26 Reduced separa�on based on local
Runway Occupancy Time (ROT) characterisa�on
0% Not Applicable 2030
ATC02.2 Implement ground based safety nets - Short Term Conflict Alert (STCA) - level 2
for en-route opera�ons
100% Completed
ATC02.8 Ground-Based Safety Nets 100% Completed ATC02.9 Short Term Conflict Alert (STCA) for TMAs 100% Completed
ATC07.1(EETN) AMAN Tools and Procedures 0% Not Applicable ATC12.1 Automated Support for Conflict Detec�on,
Resolu�on Support Informa�on and Conformance Monitoring
100% Completed
ATC15.1 Informa�on Exchange with En-route in Support of AMAN
100% Completed
ATC15.2(EETN) Arrival Management Extended to En-route Airspace
0% Not Applicable *
ATC16 Implement ACAS II compliant with TCAS II change 7.1
100% Completed
ATC18 Mul�-Sector Planning En-route - 1P2T 0% Not Applicable 2030 ATC19(EETN) AMAN/DMAN Integra�on 0% Not Applicable *
LSSIP Year 2023 Estonia 20 Working Level Agreed
Main Objec�ves Topic Progress at the end of
2023 Status 2023 2024 2025 2026 2027 2028
2029 >2029
ATC20 Enhanced STCA with down-linked parameters via Mode S EHS
0% Not Applicable 2030
ATC23 Ini�al Air-Ground Trajectory Informa�on Sharing (Ground Domain)
0% Not yet planned *
ATC25 Ini�al Trajectory Informa�on Sharing ground distribu�on
0% Not yet planned *
ATC26(EETN) Point Merge in complex TMA 0% Not Applicable 2030 COM10.1 Migrate from AFTN to AMHS (Basic
service) 100% Completed
COM10.2 Extended AMHS 100% Completed * COM11.1 Voice over Internet Protocol (VoIP) in En-
Route 100% Completed
COM11.2 Voice over Internet Protocol (VoIP) in Airport/Terminal
100% Completed *
COM12 New Pan-European Network Service (NewPENS)
100% Completed *
COM13 Air Traffic Services (ATS) datalink using SatCom Class B
0% Not yet planned 2030
ENV01(EETN) Con�nuous Descent Opera�ons (CDO) 100% Completed * ENV02(EETN) Airport Collabora�ve Environmental
Management 100% Completed 2030
ENV03(EETN) Con�nuous Climb Opera�ons (CCO) 0% Not Applicable 2030 FCM01 Implement enhanced tac�cal flow
management services 100% Completed
FCM03 Collabora�ve Flight Planning 100% Completed FCM04.2 Enhanced Short Term ATFCM Measures 100% Completed FCM06.1 Automated Support for Traffic Complexity
Assessment and Flight Planning interfaces 100% Completed
FCM10 Interac�ve Rolling NOP 100% Completed * FCM11.1(EETN) Ini�al AOP/NOP Informa�on Sharing 0% Not Applicable * FCM11.2(EETN) AOP/NOP integra�on 0% Not Applicable *
INF07 Electronic Terrain and Obstacle Data 6% Ongoing
LSSIP Year 2023 Estonia 21 Working Level Agreed
Main Objec�ves Topic Progress at the end of
2023 Status 2023 2024 2025 2026 2027 2028
2029 >2029
(eTOD) INF10.10 Meteorological Informa�on Exchange -
Aerodrome Meteorological informa�on Service
47% Ongoing *
INF10.11 Meteorological Informa�on Exchange - En-Route and Approach Meteorological
informa�on service
5% Ongoing *
INF10.12 Meteorological Informa�on Exchange - Network Meteorological Informa�on
0% Planned *
INF10.13 Coopera�ve Network Informa�on Exchange - ATFCM Tac�cal Updates
Service (Airport Capacity and Enroute)
0% Not Applicable *
INF10.14 Coopera�ve Network Informa�on Exchange – Flight Management Service
(Slots and NOP/AOP integra�on)
0% Not Applicable *
INF10.15 Coopera�ve Network Informa�on Exchange – Measures Service (Traffic
Regula�on)
0% Not Applicable *
INF10.16 Coopera�ve Network Informa�on Exchange - Short Term ATFCM Measures
services (MCDM, eHelpdesk, STAM measures)
0% Not Applicable *
INF10.17 Coopera�ve Network Informa�on Exchange – Counts service (ATFCM
Conges�on Points)
0% Not Applicable *
INF10.19 Flight Informa�on Exchange (Yellow Profile) - Flight Data Request Service
0% Planned *
INF10.2 Stakeholders’ SWIM PKI and cyber security
13% Ongoing *
INF10.20 Flight Informa�on Exchange (Yellow Profile) - No�fica�on Service
0% Planned *
INF10.21 Flight Informa�on Exchange (Yellow Profile) - Data Publica�on Service
0% Planned *
LSSIP Year 2023 Estonia 22 Working Level Agreed
Main Objec�ves Topic Progress at the end of
2023 Status 2023 2024 2025 2026 2027 2028
2029 >2029
INF10.23 Flight Informa�on Exchange (Yellow Profile) - Extended AMAN SWIM Service
0% Not Applicable *
INF10.3 Aeronau�cal Informa�on Exchange - Airspace structure service
100% Completed *
INF10.4 Aeronau�cal Informa�on Exchange - Airspace Availability Service
100% Completed *
INF10.5 Aeronau�cal Informa�on Exchange - Airspace Reserva�on (ARES)
3% Ongoing *
INF10.6 Aeronau�cal Informa�on Exchange – Digital NOTAM service
64% Ongoing *
INF10.7 Aeronau�cal Informa�on Exchange - Aerodrome mapping service
0% Ongoing *
INF10.8 Aeronau�cal Informa�on Exchange - Aeronau�cal Informa�on Features service
8% Ongoing *
INF10.9 Meteorological Informa�on Exchange - Volcanic Ash Mass Concentra�on
informa�on service
3% Ongoing *
ITY-ACID Aircra� Iden�fica�on 92% Ongoing ITY-AGDL Ini�al ATC Air-Ground Data Link Services 100% Completed
ITY-AGVCS2 8,33 kHz Air-Ground Voice Channel Spacing below FL195
100% Completed
ITY-COTR Implementa�on of ground-ground automated co-ordina�on processes
100% Completed
ITY-FMTP Common Flight Message Transfer Protocol (FMTP)
100% Completed
NAV03.1(EETN) RNAV 1 in TMA Opera�ons 97% Ongoing 2030 NAV03.2(EETN) RNP 1 in TMA Opera�ons 0% Not Applicable 2030 NAV10(EETN) RNP Approach Procedures to instrument
RWY 100% Completed *
NAV11.1 Implement precision approach procedures using GBAS CAT II based on GAST C
0% Not Applicable 2030
NAV12 ATS IFR Routes for Rotorcra� Opera�ons 0% Not Applicable 2030
LSSIP Year 2023 Estonia 23 Working Level Agreed
Main Objec�ves Topic Progress at the end of
2023 Status 2023 2024 2025 2026 2027 2028
2029 >2029
SAF10.1 Implement measures to reduce the risk to aircra� opera�ons caused by airspace
infringements
30% Ongoing 2030
SAF11.1 Improve Runway Safety by Preven�ng Runway Excursions
100% Completed 2030
LEGEND:
* Full Operational Capability (FOC) date The Planned Implementation Date as reported in the LSSIP DB for each objective
LSSIP Year 2023 Estonia 24 Working Level Agreed
Traffic and Capacity
1.3 Na�onal ATM Structure
Geographical description of the FIR(s)
The geographical scope of this document addresses the Estonia ‘Tallinn Flight Information Region’ FIR:
Tallinn FIR is surrounded by FIRs of 4 States, namely Helsinki FIR and Helsinki TMA in the north, St. Petersburg FIR in the east, Riga FIR/TMA in the south and Sweden FIR-s in the west.
St. Petersburg belongs to the Russian Federation, a non- ECAC State.
The Control Area (CTA) covers the geographical limits of the Tallinn FIR from FL 95 up to FL 660. Control Zones (CTR-s) are implemented around 2 airports, namely Tallinn and Ämari (Military). In addition, there are Kärdla, Kuressaare, Pärnu and Tartu FIZ.
LSSIP Year 2023 Estonia 25 Working Level Agreed
Airspace Classification and Organisation
FIR: SFC - UNL
CTA: FL 95 - FL 660
In accordance with national regulations, only the Imperial System is used in Estonia.
ATC Units
The ATC units in the Estonian airspace, which are of concern to this LSSIP, are the following:
ATC Unit Number of sectors Associated FIR(s) Remarks
En-route TMA
TALLINN ATCC 2+1 1 Tallinn
CTA (Class C)
+ 1 Feeder sector suite operational regularly as from Nov 2005
Tallinn APP 1 Tallinn TMA Collocated with Tallinn ACC
LSSIP Year 2023 Estonia 26 Working Level Agreed
Evolu�on of Traffic in Estonia
2023 Traffic in Estonia increased by 5% compared to 2022 and recovery was at 65% of 2019.
2024-2029
The EUROCONTROL Seven-Year forecast predicts an average annual increase between 0.9% and 4.5% during the planning cycle, with an average baseline growth of 2.7%.
0
50000
100000
150000
200000
250000
2019 A 2020 A 2021 A 2022 A 2023 F 2024 F 2025 F 2026 F 2027 F 2028 F 2029 F
IF R
fli gh
ts
Estonia - Annual IFR Movements
IFR movements - Actuals
IFR movements - Base
IFR movements - High
IFR movements - Low
2020 A 2021 A 2022 A 2023 F 2024 F 2025 F 2026 F 2027 F 2028 F 2029 F
High . . . 6.8% 10.0% 4.0% 3.7% 3.4% 3.3% 2.6% Base -58% 13% 30% 6.1% 8.3% 1.7% 1.9% 1.7% 1.6% 1.0% Low . . . 5.4% 6.2% -0.5% 0.3% 0.0% 0.1% -0.5% High . . . 10% 9.1% 3.6% 3.4% 2.9% 2.7% 2.1% Base -55% 25% 48% 10% 6.9% 1.7% 2.0% 1.7% 1.7% 1.0% Low . . . 8.8% 5.9% -0.1% 0.5% 0.3% 0.4% -0.3%
EUROCONTROL Forecast Update 2023-2029 - October 2023
IFR Movements (Growth)
Estonia
ECAC
LSSIP Year 2023 Estonia 27 Working Level Agreed
Tallinn ACC
Traffic and en-route ATFM delays 2019-2029
2023 performance
Tallinn ACC
Traffic En-route Delay (min. per flight)
Capacity
2023 vs.2022
% of 2019 All reasons
ACC Reference
Value
Capacity Gap?
Baseline
Year +5% 63% 0.00 0.03 No
Summer +9% 66% 0.00 51
Summer 2023 performance assessment
The average delay per flight was zero in Summer 2023.
Opera�onal ac�ons Achieved Comments Review and analysis of exis�ng FRA connec�ng routes (FINEST AREA) Ongoing Pending FINEST state-level agreement
FINEST: review and update of necessary procedures Ongoing Pending FINEST state-level agreement
Bal�c three-state CIV-MIL mee�ngs Ongoing All military exercises in Bal�c Sea region are properly coordinated
Possible modifica�ons according to KPIs and customer feedback Ongoing
Moderniza�on of Tallinn TMA and CTR Ongoing CTR modernisa�on planned for spring 2024, and TMA modernisa�on to be launched during spring 2024
Dynamic sectorisa�on in Tallinn FIR Ongoing Simula�ons are ongoing to find addi�onal configura�ons for summer 2024, based on 2023 airblocks
Harmonized ATC procedures between Finland and Estonia Ongoing Pending FINEST state-level agreement FINEST: review and update of necessary ATM procedures Ongoing Pending FINEST state-level agreement
VCS update 23 MAR 2023 Yes
Maximum configura�on: 3 EETT / 10 FINEST* Yes *Pending FINEST state-level agreement
2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Peak Day Traffic 777 553 468 470 503 Summer Traffic 669 207 318 408 445 Yearly Traffic 605 253 288 365 382 Summer Traffic Forecast - Baseline 473 482 488 495 501 507 Summer Traffic Forecast - High 480 495 508 522 535 546 Summer Traffic Forecast - Low 465 465 466 467 466 465 Summer enroute delay (all causes) 0.01 0.00 0.00 0.00 0.00 Yearly enroute delay (all causes) 0.00 0.00 0.00 0.00 0.00
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0
100
200
300
400
500
600
700
800
900
En ro
ut e
De la
y (m
in ut
es p
er fl
ig ht
)
IF R
fli gh
ts (D
ai ly
A ve
ra ge
) EETTACC - Traffic and en-route ATFM delays
LSSIP Year 2023 Estonia 28 Working Level Agreed
Planning Period – Summer 2024-2029 The planning focuses on the summer season to reflect the most demanding period of the year from a capacity perspective. This approach ensures consistency with the previous planning cycles. The measures for each year are the measures that will be implemented before the summer season.
Summer Capacity Plan
2024 2025 2026 2027 2028 2029
Free Route Airspace Follow up of and possible modifica�ons to support ATFCM
Airspace Management Advanced FUA
FINEST: review and update of necessary procedures
Bal�c three-state CIV-MIL mee�ngs
Airport & TMA Network Integra�on Possible modifica�ons according to KPIs and customer feedback
Moderniza�on of Tallinn CTR
Moderniza�on of Tallinn TMA
Coopera�ve Traffic Management FINEST review and update as necessary
Common FMP for Estonia and Finland
Airspace
Dynamic Cross-border sectorisa�on Estonia/Finland
Dynamic sectorisa�on in
Tallinn FIR
FINEST: review and update of airspace as necessary a�er the FINEST implementa�on
Procedures Harmonized ATC procedures between Finland and Estonia
FINEST: review and update of necessary ATM procedures
Staffing ATCO cross border opera�ons between Finland and Estonia
Technical
ATM system upgrade and
interface with LARA (spring 2024)
Capacity
One configura�on for FINEST managed by common FMP
FINEST capacity based on CAPAN. Pending FINEST
cross-border service with 1FDP
FINEST capacity annual review. Pending FINEST cross-border service with 1FDP
Significant Events
Max sectors 4 EETT 4 EETT 10 FINEST*
4 EETT 10 FINEST*
4 EETT 10 FINEST*
4 EETT 10 FINEST*
4 EETT 10 FINEST*
Planned Annual Capacity Increase 3% 3% 3% 3% 3% 3%
Capacity Profile - Base Annual % Increase 0%
Capacity Plan v. Profile - Base 4%
Annual Reference Value (min) 0.02
Addi�onal informa�on * Pending FINEST cross-border service with 1FDP
LSSIP Year 2023 Estonia 29 Working Level Agreed
0
1
2
3
4
00 :0
0 01
:0 0
02 :0
0 03
:0 0
04 :0
0 05
:0 0
06 :0
0 07
:0 0
08 :0
0 09
:0 0
10 :0
0 11
:0 0
12 :0
0 13
:0 0
14 :0
0 15
:0 0
16 :0
0 17
:0 0
18 :0
0 19
:0 0
20 :0
0 21
:0 0
22 :0
0 23
:0 0
EETTCTA - May-October 2024
Nb sectors (std) Nb sectors (max)
2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2024-2029 Plan 53 55 57 59 61 63 2024-2029 Capacity Profile BASE 51 Capacity Baseline 67 36 40 51 51
0
10
20
30
40
50
60
70
80
Ca pa
ci ty
p ro
fil e
(m ov
em en
ts p
er h
ou r)
EETTCTA - Reference capacity profile
2024-2029 Outlook
No capacity issues are foreseen for Tallinn ACC for the period 2024-2029.
LSSIP Year 2023 Estonia 30 Working Level Agreed
2 Na�onal ATM Environment
Main Na�onal Stakeholders
Civil Regulator(s)
General Information Civil Aviation in Estonia is the responsibility of the Ministry of Climate. The different national entities having regulatory responsibilities in ATM are summarised in the table below. The Estonian Transport Administration is further detailed in the following sections.
Activity in ATM: Organisation responsible Legal Basis
Rulemaking Ministry of Climate Rulemaking: Ministry of Climate.
Statutes of Ministry of Climate
(Regulation of Government of the Republic of Estonia No 71 of 29. June 2023)
Safety Oversight The Estonian Transport Administration (Estonian NSA)
(From 01.01.2021)
Safety Oversight: Estonian Transport Administration
Aviation Act
Statutes of Estonian Transport Administration
(Regulation of the Minister of Economic Affairs and Infrastructure No 82 of 03. December 2020)
Enforcement actions in case of non-compliance with safety regulatory requirements
Estonian NSA Aviation Act
Statutes of Estonian Transport Administration
(Regulation of the Minister of Economic Affairs and Infrastructure No 82 of 03. December 2020)
Airspace Estonian NSA Aviation Act
Statutes of Estonian Transport Administration
(Regulation of the Minister of Economic Affairs and Infrastructure No 82 of 03. December 2020)
Economic MoEA&C Statutes of Ministry of Climate
(Regulation of Government of the Republic of Estonia No 71 of 29. June 2023)
Environment Ministry of Environment Statutes of Climate
(Regulation of Government of the Republic of Estonia No 71 of 29. June 2023)
Security Estonian NSA Aviation Act
Statutes of Estonian Transport Administration
(Regulation of the Minister of Economic Affairs and Infrastructure No 82 of 03. December 2020)
Accident investigation Estonian Safety Investigation Bureau (ESIB)
Aviation Act
Statues of Ministry of Economic Affairs and
LSSIP Year 2023 Estonia 31 Working Level Agreed
Communica�on
(Regula�on of Government of the Republic of Estonia No 323 of 10. December 2002)
Estonian Transport Administration
The Estonian Transport Administration (Estonian NSA) is in the jurisdiction of the Ministry of Climate, and it is the Estonian Safety Supervisory Authority, responsible for exercising state supervision over the compliance with the requirements deriving from legal acts regulating the field of activity of Estonian NSA. It has enforcement powers, and it is the extra-judicial body, which conducts proceedings in matters of misdemeanours. Estonian NSA participates in the drafting of legal acts concerning its area of activities, makes proposals on the amendments of those legal acts, such as the improvement of Estonian-language aviation terminology, participates in the development of policies, strategies, development plans, prepares and implements projects in its area of activities, including international projects. The Estonian NSA is institutionally separated from the Estonian Service Providers.
Annual Report published: Y Annual Safety report of 2023 has been published here.
National Civil Aviation Master Plan (CAMP):
N National CAMP is referenced in ICAO resolutions below:
• A39-23: No Country Left Behind (NCLB) Initiative (Draws the attention of Contracting States requesting technical cooperation and technical assistance to the advantages to be derived from well-defined projects based on civil aviation master plans)
• A39-25: Aviation’s contribution towards the United Nations 2030 Agenda for Sustainable Development (Urges Member States to enhance their air transport systems by effectively implementing SARPs and policies while at the same time including and elevating the priority of the aviation sector into their national development plans supported by robust air transport sector strategic plans and civil aviation master plans, thereby leading to the attainment of the SDGs)
• A39-26: Resource Mobilization (Requests the Secretary General to develop guidance material to assist States in including and elevating the priority of the aviation sector into their national development plans and developing robust air transport sector strategic plans and civil aviation master plans).
The Estonian Transport Administration website is: https://transpordiamet.ee/en
The organization chart is available in Annex D.
LSSIP Year 2023 Estonia 32 Working Level Agreed
Estonian Air Navigation Services - EANS
Service provided
In accordance with international standards the controlled airspace is divided into 3 air traffic control units to fulfil different tasks: Tower Control Unit, Approach Control Unit and Area Control Centre. In addition to these services the ATS units also provide alerting service and flight information service.
The services of EANS are:
- Provision of Air Traffic Service;
- Publication, exchange and dissemination of Aeronautical Information - Aeronautical Information Services;
- Technology: ATM Systems, Navigation, Radio Communication, Surveillance;
- Consultancy Services and expertise in the field of aviation;
- Development activities.
EANS
Governance: MoEA&C Ownership: 100% State (MoEA&C)
Services provided Y/N Comment
ATC en-route Y
ATC approach Y
ATC Aerodrome(s) Y Tallinn CTR.
AIS Y
CNS Y
MET N Estonian Environment Agency
ATCO training Y EANS provides OJT and complementary training.
Others Remote TWR (rAFIS) service in Tallinn for Tartu AD. There is a plan to start provision of the AFIS also at other Estonian regional airports by using Remote TWR (rAFIS) concept.
Additional information: -
Provision of services in other State(s):
N
Annual Report published: Y This is the annual report covering yearly activities of the ANSP.
Further information is available on the EANS website: http://www.eans.ee/en
The organisation chart is available in Annex D.
LSSIP Year 2023 Estonia 33 Working Level Agreed
ATC systems in use
Main ANSP part of any technology alliance1 Y FINEST
FDPS
Specify the manufacturer of the ATC system currently in use: Thales
Upgrade2 of the ATC system is performed or planned? Software and hardware upgrade planned 2024
Replacement of the ATC system by the new one is planned? Not planned
ATC Unit ACC/APP
SDPS
Specify the manufacturer of the ATC system currently in use: Thales
Upgrade of the ATC system is performed or planned? Software and hardware upgrade planned 2024
Replacement of the ATC system by the new one is planned? Not planned
ATC Unit ACC/APP
Airports
General information The main airports of Estonia: Tallinn, Tartu, Kuressaare, Kärdla, Pärnu airports, and Kihnu, Ruhnu airfields are operated by AS Tallinna Lennujaam. It is a 100% State owned stock company under the supervision of the Ministry of Climate.
Airport(s) covered by the LSSIP Referring to the List of Airports in the European ATM Master Plan Level 3 Implementation Plan Edition 2023– Annex 2, it is up to the individual State to decide which additional airports will be reported through LSSIP for those Objectives. The airport that is covered in this LSSIP is Tallinn Airport (non CP1).
https://airport.ee/en/corporate/lennart-meri-tallinn-airport-estonias-aerial-gateway/
The EUROCONTROL Public Airport Corner also provides information for Tallinn Airport: https://ext.eurocontrol.int/airport_corner_public/
The organisation chart is available in Annex D.
1 Technology alliance is an alliance with another service provider for joint procurement of technology from a particular supplier (e.g., COOPANS alliance) 2 Upgrade is defined as any modification that changes the operational characteristics of the system (SES Framework Regulation 549/2004, Article 2 (40))
LSSIP Year 2023 Estonia 34 Working Level Agreed
Meteorological Service Providers
Estonian Environment Agency Estonian Environment Agency, which is responsible for all activities carried out by national civil meteorological and hydrological service. The Estonian Environment Agency is responsible for provision of meteorological service (forecasting and weather warning services) for international and domestic aviation within Tallinn Flight Information Region (FIR), except EEEI AD CTR (MIL). The Weather Forecasting Department is a part of the Estonian Environment Agency (ESTEA).
Estonian Environment Agency`s objective is contribution towards the safety, regularity and efficiency of international air navigation by supplying the operators, flight crew members, air traffic service units, search and rescue services units, airport managements and other customers concerned with the conduct or development of international air navigation with the meteorological information.
The contacts of the Estonian Environment Agency and the Weather Forecasting Department can be found at https://keskkonnaagentuur.ee/en.
Service provided
Estonian Environment Agency provides 24/7 forecasting and weather warning service to Kuressaare, Kärdla, Pärnu, Tallinn, Tartu aerodromes and within Tallinn FIR. Additionally, they provide weather observation service for Estonian Civil Airports.
The organisa�on chart is available in Annex D.
Military Authorities
The Military Authorities in Estonia concerned with ATM are:
- Ministry of Defence;
- Estonian Military Aviation Authority;
- Defence Forces Air Force Staff;
- Ämari Airbase.
They report to the Ministry of Defence.
Their regulatory, service provision and user role in ATM are detailed below.
Estonian Military Aviation Authority is responsible for setting, monitoring and enforcing safety standards through military aviation regulations.
Estonian Defence Forces Air Force Staff is responsible for the safety, monitoring of military aviation tasks and participation in decision making progress concerning airspace management.
Ämari Airbase is responsible for air navigation service at Ämari military airfield and within Ämari control zone.
Co-ordination between civil air navigation service providers and the military authorities is ensured through Letters of Agreements (LoAs).
Further information is available on the Estonian Defence Forces website: https://mil.ee/en.
The organisation chart is available in Annex D.
LSSIP Year 2023 Estonia 35 Working Level Agreed
Regulatory role
Regulatory framework and rulemaking
Oversight
OAT GAT
OAT and provision of service for OAT governed by national legal provisions?
Y Provision of service for GAT by the Military governed by national legal provisions?
Y
Level of such legal provision: Ministry of Defence Level of such legal provision: Ministry of Defence, Estonian NSA
Authority signing such legal provision: Minister of Defence Authority signing such legal provision: Ministry of Defence
These provisions cover: These provisions cover:
Rules of the Air for OAT Y
Organisation of military ATS for OAT Y Organisation of military ATS for GAT Y
OAT/GAT Co-ordination Y OAT/GAT Co-ordination Y
ATCO Training Y ATCO Training Y
ATCO Licensing Y ATCO Licensing Y
ANSP Certification NA ANSP Certification Y
ANSP Supervision NA ANSP Supervision Y
Aircrew Training Y ESARR applicability NA
Aircrew Licensing Y
Additional Information: - Additional Information: -
Means used to inform airspace users (other than military) about these provisions:
Means used to inform airspace users (other than military) about these provisions:
National AIP NA National AIP Y
National Military AIP NA National Military AIP NA
EUROCONTROL eAIP NA EUROCONTROL eAIP NA
Other: Y Other: -
OAT GAT
NSA (as per SES reg. 550/2004) for GAT services provided by the military is CAA.
NSA for OAT is MoD
NSA (as per SES reg. 550/2004) for GAT services provided by the military is Estonian Transport Administration.
Additional information: - Estonian Transport Administration is responsible for the certification for GAT.
LSSIP Year 2023 Estonia 36 Working Level Agreed
Service Provision role
Military ANSP providing GAT services SES certified?
Y If YES, since: 01.05.2017 Duration of the Certificate:
NIL
Certificate issued by: Estonian Transport Administration
If NO, is this fact reported to the EC in accordance with SES regulations?
NA
Additional Information: Military provides service to GAT in Ämari CTR.
User role
OAT GAT
Services Provided: Services Provided:
En-Route N En-Route Military fly GAT, the service is provided by EANS
En-Route N
Approach/TMA N EANS Approach/TMA N
Airfield/TWR/GND Y Airfield/TWR/GND Y
AIS Y AIS N
MET Y MET Y
SAR Y SAR Y
TSA/TRA monitoring Y FIS Y
Other: - Other: -
Additional Information: Additional Information:
IFR inside controlled airspace, Military aircraft can fly?
OAT only N GAT only N Both OAT and GAT Y
If Military fly OAT-IFR inside controlled airspace, specify the available options:
Free Routing Y Within specific corridors only N
Within the regular (GAT) national route network Y Under radar control Y
Within a special OAT route system N Under radar advisory service N
If Military fly GAT-IFR inside controlled airspace, specify existing special arrangements:
No special arrangements Y Exemption from Route Charges N
Exemption from flow and capacity (ATFCM) measures N Provision of ATC in UHF N
CNS exemptions: RVSM N 8.33 N Mode S N ACAS N
Others: Provision of ATC in UHF available only by Ämari TWR.
LSSIP Year 2023 Estonia 37 Working Level Agreed
Flexible Use of Airspace (FUA)
Military in Estonia applies FUA requirements as specified in the Regulation No 2150/2005: Y
FUA Level 1 implemented: Y
FUA Level 2 implemented: Y
FUA Level 3 implemented: Y
LSSIP Year 2023 Estonia 38 Working Level Agreed
3 Implementa�on Projects
The tables below present high-level information about the main projects currently ongoing in Estonia. The details of each project are available in the LSSIP DB.
3.1 Na�onal projects
Name of project: Organisation(s): Schedule: Progress Description: Links: Implementation of UTM software
EANS (EE), Estonian Transport Administration (EE), Frequentis AG
Coordination of unmanned flights in Tallinn CTR started in 2023, services at Tartu and other regional airports will be added in the following years. UTM services for authority users (emergency services, police etc) are planned for 2024-2025. Interfacing with national drone registry is planned for early 2025. Provision of CIS services is planned in the coming years, with the implementation of U-space.
Additional services are added to the UTM system in 2024 March, together with mobile applications for pilots. Project to provide UTM services in Tartu airport begins in II quarter of 2024 with implementation planned for late 2024. Preparations for getting data from national drone registry started in 2023 and will continue throughout 2024. Discussions and workshops to design UTM services for authority users started in early 2024.
-
Navigation Infrastructure Rationalisation
EANS (EE), Estonian Transport Administration (EE)
2024 IQ Implementation and activities are ongoing, project is planned to be implemented by the first quarter of 2024.
L3: NAV03.1
Tallinn Airport A-CDM implementation project
EANS (EE), TALLINN AIRPORT Ltd. (EE)
- Delayed. Due to Covid-19 economic crisis, resources are minimized.
L3: AOP05
LSSIP Year 2023 Estonia 39 Working Level Agreed
Name of project: Organisation(s): Schedule: Progress Description: Links: rTWR Implementation EANS (EE), Estonian
Transport Administration (EE), TALLINN AIRPORT Ltd. (EE)
Tartu is operational since April 2023 and Kuressaare aerodrome should be operational in IIQ 2024.
Two airports' (Kuressaare and Tartu) remote tower installations are ready, governing body Estonian Transportation Administration has issued aeronautical equipment certificate separately for both installations. Service validation activities for Kuressaare aerodrome's remote tower are starting in November 2023. Kuressaare remote tower is expected to be operational in IIQ 2024.
-
3.2 FAB projects
NIL
3.3 Mul�na�onal projects
Name of project: Organisation(s): Schedule: Progress Description: Links: Borealis FRA Implementation (Part 2) (2015_227_AF3_A; 2015_227_AF3_B)
AVINOR AS (NO), AirNav Ireland-ATS Provider (IE), EANS (EE), Fintraffic ANS (FI), LFV (SE), LGS (LV), NATS (UK), Naviair (DK)
2015 - 2024 Work in progress L3: AOM21.2
CONCERTO Solution 2 Borealis Alliance, DLR, EANS (EE), EUROCONTROL, IcelandAir, Thales
Planning in progress Project started 2023.
Implementation planned 2023-2026
-
EANS Support to ACADIA (2022_014_AF5)
EANS (EE), EUROCONTROL Project ongoing Implementation plan established and subtask 2 achieved.
L3: INF10.7, INF10.6, INF10.8
LSSIP Year 2023 Estonia 40 Working Level Agreed
4 Coopera�on Ac�vi�es
4.1 FAB Coordina�on
NEFAB
The main objectives of ANSPs cooperation in the framework of NEFAB are coordination of efforts, sharing of resources
and synergy.
This cooperation includes:
- Coordinated cooperation with States to support NEFAB Committees and Council;
- Analysis and monitoring of SES requirements, coordinating with EU initiatives;
- Common representation of the NEFAB ANSPs at the NMB;
- Cooperation and information sharing between NEFAB ANSPs on CANSO and NM working groups activities;
- Coordinated contribution to NDOP, NDTECH and development of network services.
4.2 Mul�na�onal Coopera�on Ini�a�ves
Borealis FRA
The Borealis Alliance is the industrial partnership between 9 European ANSPs - LFV (Sweden), ANS Finland (Finland), Avinor (Norway), Isavia ANS (Iceland), Naviair (Denmark), EANS (Estonia), IAA (Ireland), LGS (Latvia) and NATS (UK). The objective of the Alliance is to enable joint initiatives to improve flight efficiency and reduce environmental impact, delivered across the whole area in a move which will also streamline cost of services and operational/technical infrastructure.
Alliance continues to work on Free Route Airspace (FRA) Programme execution to create a multi-FAB FRA by establishing interfaces between FRA areas in 3 FABs and Iceland. FRA implementation is still on-going in UK and is expected to complete in 2028.
Meanwhile, the IAA expanded Free Route Airspace (FRA) in 2017 to include Low Level airspace from FL075. In 2019 the Borealis Alliance commenced cross-border FRA between the Maastricht UAC area of responsibility, the DK/SE FAB and the northern part of Germany; and remains open to considering other cross-border proposals should they arise.
Successful FRA implementation in NEFRA airspace enabled the removal of ATS routes in Estonia and Finland. Some other States also consider removal of ATS routes.
FINEST
FINEST is a bilateral coopera�on programme between Estonia EANS and Fintraffic ANS intended to respond to the demands of increased air traffic and Single European Sky requirements.
The objec�ve of FINEST is to achieve op�mal performance in the areas of service provision, cost-efficiency, capacity, flight efficiency, con�nuity and safety. This has been expected to be achieved by providing dynamic cross-border service with common technical system infrastructure from two loca�ons.
LSSIP Year 2023 Estonia 41 Working Level Agreed
The project was kicked off in 2018 and since then, both EANS and Fintraffic ANS have been working together, involving also other par�es in both countries, to both legally and technically make the service provision in the shared airspace happen. FINEST is planned to be launched in phases. ANSP-s have harmonized the ATM System parameters in 2020, have installed the upgraded version of ATM System TopSky on both sides in spring 2021. At the beginning of 2022 EANS finalized airspace changes which is the enabler for the cross border FINEST project and harmonized opera�onal procedures. Due to geopoli�cal situa�on the approval for the project from MoDs have been delayed as addi�onal concerns were raised. Throughout the year 2023 the dialogue with owners and MoDs were kept open to define the way for approval in the changed geopoli�cal situa�on. The cross-border service provision shall be ini�ated a�er the final approval from both Sates.
LSSIP Year 2023 Estonia 42 Working Level Agreed
5 Detailed Objec�ves Implementa�on progress
Objective/Stakeholder Progress Code:
Completed Not yet planned
Ongoing Not Applicable
Planned Missing Data
In 2023, there was a greater focus on mee�ng the requirements of CP1, and several ac�vi�es were completed. Yet some projects have got a delay, and some have been postponed (Due to luck of human resource and budget-related issues).
Main Objectives
AOM13.1
Harmonise Opera�onal Air Traffic (OAT) and General Air Traffic (GAT) Handling Timescales: Ini�al opera�onal capability: 01/01/2012 Full opera�onal capability: 31/12/2018
56 Ongoing
- Ac�vity should be completed by the end 2024. 31/12/2024
REG (By:12/2018) Estonian Air Force (MIL) 40% Ongoing Estonian na�onal military avia�on regula�ons are in force. Review of IFR OAT harmonisa�on procedures is postponed to 2024. - 31/12/2024
Estonian Transport Administra�on 40% Ongoing Objec�ve is in late status. The ac�vity was not completed in 2023 due to ongoing lack of HUM resources. - 31/12/2024
ASP (By:12/2018) EANS 100% Completed Objec�ve ac�vi�es completed by EANS. - 28/02/2022 Estonian Air Force (MIL) 100% Completed Estonian na�onal military avia�on regula�ons are in force. TRG is done. - 31/12/2021
MIL (By:12/2018) Estonian Air Force (MIL) 20% Ongoing Estonian AF will connect na�onal route structures and arrangements to form a flexible system facilita�ng OAT-IFR cross-border flights across Europe and implement harmonized military flight planning for OAT cross-border opera�ons.
- 31/12/2024
SDP 3.1.2 AOM19.4
Management of Predefined Airspace Configura�ons Timescales: Ini�al opera�onal capability: 01/01/2018 Full Opera�onal Capability / Target Date: 31/12/2022
100 Completed
- Objec�ve completed. 27/01/2022
ASP (By:12/2022) EANS 100% Completed
LSSIP Year 2023 Estonia 43 Working Level Agreed
SDP 3.1.2 AOM19.4
Management of Predefined Airspace Configura�ons Timescales: Ini�al opera�onal capability: 01/01/2018 Full Opera�onal Capability / Target Date: 31/12/2022
100 Completed
Objec�ve completed. - 27/01/2022
SDP 3.1.1 AOM19.5
ASM and A-FUA Timescales: Ini�al Opera�onal Capability: 01/01/2014 Full Opera�onal Capability / Target Date: 31/12/2022
100 Completed
- The status of the objec�ve is "late", since project relates to the FINEST project. FINEST was postponed from the co-opera�onal State side. Nonetheless, according to the last feedback received from SDM AF3 Experts (27 Feb 2023): EANS is already compliant even if using a local ASM and not having any automated connec�on with ATC system at the moment, but manually triggering reserved areas on ATCOs CWPs. This automated exchange shall be there for AF5 target date (31.12.2025).
31/12/2021
ASP (By:12/2022) EANS 100% Completed 2022 was planned common ASM system with FINEST CROSS BDRY service, but project postponed. Fully completed when LARA-Topsky interface is implemented. Nonetheless, according to the last feedback received from SDM AF3 Experts (27 Feb 2023): EANS is already compliant even if using a local ASM and not having any automated connec�on with ATC system at the moment, but manually triggering reserved areas on ATCOs CWPs. This automated exchange shall be there for AF5 target date (31.12.2025).
- 31/12/2021
SDP 3.2.1 AOM21.2
Ini�al Free Route Airspace Timescales: Ini�al opera�onal capability: 01/01/2015 Full Opera�onal Capability / Target Date: 31/12/2022
100 Completed
- Free Route Airspace was implemented within NEFAB area on 12 November 2015. 12/11/2015
ASP (By:12/2022) EANS 100% Completed
NEFAB Free Route Airspace was implemented on 12 November 2015. Borealis FRA
Implementa�on (Part 2)
12/11/2015
SDP 3.2.2 AOM21.3
Enhanced Free Route Airspace Opera�ons Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
100 Completed
- Completed. 23/04/2020
ASP (By:12/2025) EANS 100% Completed
LSSIP Year 2023 Estonia 44 Working Level Agreed
SDP 3.2.2 AOM21.3
Enhanced Free Route Airspace Opera�ons Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
100 Completed
- The neighbouring countries with which they have cross-border FRA opera�ons (being) implemented: Latvia, Finland, Sweden. - The TMAs with which FRA connec�vity to TMAs (being) implemented: Helsinki TMA ja Tallinn TMA. - Time limita�ons: NIL - Flight Level: FL095+ excl Tallinn TMA ja Helsinki TMA - Published Constraints: restric�ons Estonian AIP ENR3.3, ENR1 FRA General procedures, ENR 3.5, ENR4.4 (FRA relevance). - Area of Responsibility: Tallinn FIR, NEFRA
- 23/04/2020
AOP04.1
Advanced Surface Movement Guidance and Control System A-SMGCS Surveillance Service (former ICAO Level 1) Timescales: Ini�al opera�onal capability: 01/01/2007 Full opera�onal capability: 31/12/2020
100 Completed
EETN - Tallinn Airport A-SMGCS Level 1 system is implemented on 10 February 2011. 31/12/2013
REG (By:12/2010) Estonian Transport Administra�on 100% Completed Transponder opera�ng procedures are published in the AIP. - 31/12/2013
ASP (By:01/2021) EANS 100% Completed A-SMGCS system on the Tallinn airport is implemented on February, 10 2011. - 28/02/2011
APO (By:01/2021) TALLINN AIRPORT Ltd. 100% Completed A-SMGCS system on the Tallinn airport is implemented on February 10 2011. - 28/02/2011
AOP04.2
Advanced Surface Movement Guidance and Control System (A-SMGCS) Runway Monitoring and Conflict Aler�ng (RMCA) (Airport Safety Support Service = former ICAO Level 2) Timescales: Ini�al opera�onal capability: 01/01/2021 Full opera�onal capability: 31/12/2025
100 Completed
EETN - Tallinn Airport A-SMGCS Level II system at Tallinn Airport is implemented on 10 February 2011. 28/02/2011
ASP (By:12/2025) EANS 100% Completed A-SMGCS Level II system at the Tallinn airport is implemented on 10 February 2011. - 28/02/2011
APO (By:12/2025) TALLINN AIRPORT Ltd. 100% Completed A-SMGCS Level II system at Tallinn Airport is implemented on 10 February 2011. - 28/02/2011
AOP05
Airport Collabora�ve Decision Making (A-CDM) Timescales: Ini�al opera�onal capability: 01/01/2004 Full opera�onal capability: 31/12/2020
1 Ongoing
EETN - Tallinn Airport
LSSIP Year 2023 Estonia 45 Working Level Agreed
AOP05
Airport Collabora�ve Decision Making (A-CDM) Timescales: Ini�al opera�onal capability: 01/01/2004 Full opera�onal capability: 31/12/2020
1 Ongoing
EANS and Tallinn airport postponed the implementa�on of A-CDM at Tallinn aerodrome. A-CDM should be implemented in the frame of project Airport 4.0. 31/12/2030
ASP (By:01/2021)
EANS 0% Not yet planned
The full implementa�on of A-CDM is currently not planned, and a more detailed analysis is planned in 2025.
Tallinn Airport A- CDM
implementa�on project
-
APO (By:01/2021) TALLINN AIRPORT Ltd. 2% Ongoing
The full implementa�on of A-CDM is currently not planned. More detailed analysis is planned in 2025.
Tallinn Airport A- CDM
implementa�on project
31/12/2030
AOP10 Time-Based Separa�on Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport No opera�onal need to implement TBS in EETN -
REG (By:01/2024)
Estonian Transport Administra�on 0% Not Applicable
No opera�onal need to implement TBS in EETN - - ASP (By:12/2024)
EANS 0% Not Applicable
No opera�onal need to implement TBS in EETN - -
SDP 2.2.1 AOP11.1
Ini�al Airport Opera�ons Plan Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport N/A for EETN AD, according to bilateral mee�ng Bilateral mee�ng NEFAB. -
ASP (By:12/2023)
EANS 0% Not Applicable
N/A. - - APO (By:12/2023)
SDP 2.2.2 AOP11.2
Extended Airport Opera�ons Plan Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport Outside of applicability area, EETN is non-CP1 Airport. -
ASP (By:12/2027)
EANS 0% Not Applicable
Outside of applicability area. - - APO (By:12/2027)
LSSIP Year 2023 Estonia 46 Working Level Agreed
SDP 2.2.2 AOP11.2
Extended Airport Opera�ons Plan Timescales: - not applicable -
0 Not Applicable
TALLINN AIRPORT Ltd. 0% Not Applicable
EETN is non-CP1 Airport. - -
SDP 2.3.1 AOP12.1
Airport Safety Nets Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport N/A for EETN AD, according to bilateral mee�ng and MPL3 Plan 2022_Technical Annex_v1.1_ANNEX 3 – APPLICABILITY TO AIRPORTS -
ASP (By:12/2025)
EANS 0% Not Applicable
N/A. - - APO (By:12/2025)
AOP13
Automated Assistance to Controller for Surface Movement Planning and Rou�ng Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport No opera�onal need in EETN -
REG (By:12/2025)
Estonian Transport Administra�on 0% Not Applicable
No opera�onal need in EETN - - ASP (By:12/2025)
EANS 0% Not Applicable
No opera�onal need in EETN - -
SDP 2.1.1 AOP19
Departure Management Synchronised with Pre-departure sequencing Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport EETN is non-CP1 Airport -
ASP (By:12/2022)
EANS 0% Not Applicable
Outside of applicability area. - - APO (By:12/2022)
ATC02.8
Ground-Based Safety Nets Timescales: Ini�al opera�onal capability: 01/01/2009 Full opera�onal capability: 31/12/2021
100 Completed
- System is ready for use, but no demand, thereof ATC TRG NA also. Planned ac�va�on date is unknown. 31/12/2022
ASP (By:12/2021) EANS 100% Completed
LSSIP Year 2023 Estonia 47 Working Level Agreed
ATC02.8
Ground-Based Safety Nets Timescales: Ini�al opera�onal capability: 01/01/2009 Full opera�onal capability: 31/12/2021
100 Completed
MSAW and APM func�ons are technically available in ATM system, however, due to no opera�onal demand and low ground structure, there is no need to ac�vate MSAW and APM func�ons. APW func�on is implemented.
- 31/12/2022
ATC07.1 AMAN Tools and Procedures Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport There is no opera�onal need for basic AMAN. No forecast indica�ng the need. However, EANS is using AMAN for Helsinki inbound traffic and affected by ESSA extended AMAN plans.
-
ASP (By:01/2020)
EANS 0% Not Applicable
There is no opera�onal need for basic AMAN. No forecast indica�ng the need. However, we are using AMAN for Helsinki inbound traffic and affected by ESSA extended AMAN plans.
- -
ATC12.1
Automated Support for Conflict Detec�on, Resolu�on Support Informa�on and Conformance Monitoring Timescales: Ini�al opera�onal capability: 01/01/2015 Full opera�onal capability: 31/12/2021
100 Completed
- MTCD, resolu�on support func�on and MONA are available since 2012. No definite plans to implement TCT. 31/05/2012
ASP (By:12/2021) EANS 100% Completed MTCD, resolu�on support func�on and MONA are available since 2012. No definite plans to implement TCT. - 31/05/2012
ATC15.1
Informa�on Exchange with En-route in Support of AMAN Timescales: Ini�al opera�onal capability: 01/01/2012 Full opera�onal capability: 31/12/2019
100 Completed
- In En-Route opera�ons, informa�on exchange mechanisms, tools and procedures are implemented. 31/01/2017
ASP (By:12/2019) EANS 100% Completed In En-Route opera�ons, informa�on exchange mechanisms, tools and procedures are implemented. - 31/01/2017
SDP 1.1.1 ATC15.2
Arrival Management Extended to En-route Airspace Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport N/A for EETN AD, EETN AD is non-CP1. -
ASP (By:12/2024)
EANS 0% Not Applicable
Tallinn Airport is not listed in CP1 Geographical Scope. - -
LSSIP Year 2023 Estonia 48 Working Level Agreed
SDP 1.2.1 ATC19
AMAN/DMAN Integra�on Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport N/A for EETN AD, Tallinn Airport is not listed in CP1 Geographical Scope. -
ASP (By:12/2027)
EANS 0% Not Applicable
No planned ac�vi�es. Tallinn Airport is not listed in CP1 Geographical Scope. - - APO (By:12/2027)
TALLINN AIRPORT Ltd. 0% Not Applicable
Not planned, Tallinn Airport is not listed in CP1 Geographical Scope. - -
SDP 6.1.2 ATC23
Ini�al Air-Ground Trajectory Informa�on Sharing (Ground Domain) Timescales: Ini�al Opera�onal Capability: 01/01/2024 Full Opera�onal Capability / Target Date: 31/12/2027
0 Not yet planned
- The objec�ve is not planned yet. -
ASP (By:12/2027)
EANS 0% Not yet planned
The objec�ve is not planned yet. - -
SDP 6.3.1 ATC25
Ini�al Trajectory Informa�on Sharing ground distribu�on Timescales: Ini�al Opera�onal Capability: 01/01/2024 Full Opera�onal Capability / Target Date: 31/12/2027
0 Not yet planned
- Not yet planned. -
ASP (By:12/2027)
EANS 0% Not yet planned
Not yet planned. Currently we are looking into the possibility to join the ACDLS. - -
COM10.2
Extended AMHS Timescales: Ini�al Opera�onal Capability: 01/12/2011 Full Opera�onal Capability: 31/12/2024
100 Completed
- AMHS capability is available, tested, validated, but not in use yet. 12/10/2021
ASP (By:12/2024) EANS 100% Completed Capability is available, tested, validated, but not in use. There is no need for enhanced capability. - 12/10/2021
COM11.1
Voice over Internet Protocol (VoIP) in En-Route Timescales: Ini�al opera�onal capability: 01/01/2013 Full opera�onal capability: 31/12/2021
100 Completed
- The VCS project was completed by 23. March 2023. 23/03/2023
ASP (By:12/2021)
LSSIP Year 2023 Estonia 49 Working Level Agreed
EANS 100% Completed The VCS project completed. The new MAIN VoIP VCS and B-up VCS are opera�onal. - 23/03/2023
COM11.2
Voice over Internet Protocol (VoIP) in Airport/Terminal Timescales: Ini�al opera�onal capability: 01/01/2013 Full opera�onal capability: 31/12/2023
100 Completed
- Ac�vi�es are completed, related to the development of remote tower. EETU AD remote Aerodrome Flight Informa�on Service is cer�fied on 20.04.2023. 20/04/2023
ASP (By:12/2023) EANS 100% Completed Ac�vi�es are completed, related to the development of remote tower. - 20/04/2023
COM12
New Pan-European Network Service (NewPENS) Timescales: Ini�al opera�onal capability: 01/01/2018 Full opera�onal capability: 31/12/2024
100 Completed
- CPA has been signed. EANS migrated to NewPENS in July 2019. AD has announced on JAN 2021, that they have no plans to migrate into the NewPENS. 31/07/2019
ASP (By:12/2024) EANS 100% Completed EANS migrated to NewPENS in July 2019. - 31/07/2019
APO (By:12/2024)
TALLINN AIRPORT Ltd. 0% Not Applicable
AD has no plans to migrate into the NewPENS. - -
ENV01
Con�nuous Descent Opera�ons (CDO) Timescales: Ini�al opera�onal capability: 01/07/2007 Full opera�onal capability: 31/12/2023
100 Completed
EETN - Tallinn Airport CDO and P-RNAV procedures were implemented in Tallinn TMA 30 May 2013. Performance monitoring is done. 31/12/2023
ASP (By:12/2023) EANS 100% Completed EANS implemented P-RNAV and CDO techniques in May 2013. Performance monitoring by ANSP side is done via Eurocontrol site htps://ansperformance.eu/ and also in coopera�on with Tallinn Airport.
- 31/12/2023
APO (By:12/2023) TALLINN AIRPORT Ltd. 100% Completed Monitoring of performance is established, data received from EANS. - 31/12/2017
FCM03
Collabora�ve Flight Planning Timescales: Ini�al opera�onal capability: 01/01/2000 Full opera�onal capability: 31/12/2022
100 Completed
-
LSSIP Year 2023 Estonia 50 Working Level Agreed
Func�onality installed and available but problems so far at NM within automa�cally processing and firmly specifying the use of AFP-messages in the Free Route Airspace environment causes that full FoC implementa�on of collabora�ve flight planning. Though all func�onality has been installed according to spec, the interoperability between Thales TopSky and NM system has not been achieved due to complicated FRA opera�ons environment, not fully covered at NM.
01/01/2023
ASP (By:12/2022) EANS 100% Completed Func�onality installed and available but problems so far at NM within automa�cally processing and firmly specifying the use of AFP-messages in the Free Route Airspace environment causes that full FoC implementa�on of collabora�ve flight planning. Though all func�onality has been installed according to spec, the interoperability between Thales TopSky and NM system has not been achieved due to complicated FRA opera�ons environment, not fully covered at NM.
- 01/01/2023
SDP 4.1.1 FCM04.2
Enhanced Short Term ATFCM Measures Timescales: Ini�al opera�onal capability: 01/11/2017 Full Opera�onal Capability / Target Date: 31/12/2022
100 Completed
- STAM is in opera�onal use in accordance to NM CHMI and related training package. 30/06/2023
ASP (By:12/2022) EANS 100% Completed EANS is using NM STAM so�ware tool, and all the needed trainings are completed. - 30/06/2023
SDP 4.3.1 FCM06.1
Automated Support for Traffic Complexity Assessment and Flight Planning interfaces Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target date: 31/12/2022
100 Completed
- ANSP EANS relies to NM system support & development and is using CHMI and NMP Flow applica�on. Processing of APL and ACL messages is completed.
31/12/2023
ASP (By:12/2022) EANS 100% Completed EANS relies to NM system support & development and is using CHMI and NMP Flow applica�on. Processing of APL and ACL messages is completed.
- 31/12/2023
SDP 4.2.1 FCM10
Interac�ve Rolling NOP Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2023
100 Completed
- Objec�ve FCM10 does not apply to Tallinn Airport, therefore SLoA FCM10-APO01 is marked N/A. Which brings FCM10 to ‘Completed’. 30/06/2023
ASP (By:12/2023) EANS 100% Completed CHMI updates and related trainings done. - 30/06/2023
APO (By:12/2023)
LSSIP Year 2023 Estonia 51 Working Level Agreed
SDP 4.2.1 FCM10
Interac�ve Rolling NOP Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2023
100 Completed
TALLINN AIRPORT Ltd. 0% Not Applicable
According to NEFAB Bilateral mee�ng informa�on, objec�ve FCM10 does not apply to Tallinn Airport. - -
SDP 4.2.2 FCM11.1
Ini�al AOP/NOP Informa�on Sharing Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport EETN AD is non-CP1, N/A according to MPL3 Plan 2023 Technical Annex, Annex 3. Nevertheless A-CDM for EETN AD is s�ll in plans, more detailed informa�on is expected to come on 2025.
-
ASP (By:12/2023)
EANS 0% Not Applicable
Outside applicability area. - - APO (By:12/2023)
SDP 4.4.1 FCM11.2
AOP/NOP integra�on Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport EETN AD is non-CP1 Airport, N/A according to MPL3 Plan 2023 Technical Annex 3. -
ASP (By:12/2027)
EANS 0% Not Applicable
Outside applicability area. - - APO (By:12/2027)
INF07
Electronic Terrain and Obstacle Data (eTOD) Timescales: Ini�al opera�onal capability: 01/11/2014 Full opera�onal capability: 31/12/2018
6 Ongoing
- Process is in late status due to constant lack of human resources in NSA. Electronic TOD should be established by 31 December 2024. 31/12/2025
REG (By:01/2019) Estonian Transport Administra�on 8% Ongoing Process is in late status due to constant lack of human resources in NSA. Electronic TOD should be established by 31 December 2024. - 31/12/2024
ASP (By:01/2019) EANS 5% Ongoing No progress compared to last year, EANS cannot con�nue any ac�vity before Na�onal TOD Policy is available. - 31/12/2025
APO (By:01/2019) TALLINN AIRPORT Ltd. 5% Ongoing All AO related ac�vi�es will be performed a�er Na�onal TOD Policy is available. - 31/12/2025
LSSIP Year 2023 Estonia 52 Working Level Agreed
SDP 5.2.1 INF10.2
Stakeholders’ SWIM PKI and cyber security Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
13 Ongoing
- Process is slowly ongoing. 31/12/2025
ASP (By:12/2025) EANS 8% Ongoing EANS will be using the EACP solu�on. - 31/12/2024
APO (By:12/2025)
TALLINN AIRPORT Ltd. 0% Not yet planned
AD has not yet decided, with what to go further and how. Discussions with other local Stakeholders are ongoing. - -
MET (By:12/2025) Estonian Environment Agency 18% Ongoing NIL - 31/12/2025
SDP 5.3.1 INF10.3
Aeronau�cal Informa�on Exchange - Airspace structure service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
100 Completed
- LARA adapted/in use. 10/06/2020
ASP (By:12/2025) EANS 100% Completed LARA is used according to their installa�on. - 10/06/2020
SDP 5.3.1 INF10.4
Aeronau�cal Informa�on Exchange - Airspace Availability Service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
100 Completed
- ANSP has ASM system LARA which provides the AUP/UUP to NM. 31/12/2022
ASP (By:12/2025) EANS 100% Completed EANS has ASM system LARA which provides the AUP/UUP to NM. EANS is par�cipa�ng in LARA user group and also following the ac�vi�es of "ASM SWIM" project ac�vi�es to ensure the compliance of LARA tool.
- 31/12/2022
SDP 5.3.1 INF10.5
Aeronau�cal Informa�on Exchange - Airspace Reserva�on (ARES) Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
3 Ongoing
- LARA is in use. ARES info is visible to all LARA customers who have access to LARA. ANSP is wai�ng for release v5, when LARA will enable to implement the full scope of ARES exchanges via SWIM.
31/12/2024
ASP (By:12/2025) EANS 3% Ongoing
LSSIP Year 2023 Estonia 53 Working Level Agreed
LARA is used. ARES info is visible to all LARA customers who have access to LARA. Systems are used according to their installa�on. Wai�ng for release v5, when LARA will enable to implement the full scope of ARES exchanges via SWIM.
- 31/12/2024
SDP 5.3.1 INF10.6
Aeronau�cal Informa�on Exchange – Digital NOTAM service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
64 Ongoing
- Will be implemented with SWIM and informa�on exchange system developments, systems planned to be ready 2025. 31/12/2025
ASP (By:12/2025) EANS 0% Planned EANS is par�cipa�ng in project ACADIA to ensure accordance. Ac�vi�es started in 2023 and objec�ve is planned to be in opera�onal use by 2025.
EANS Support to ACADIA 31/12/2025
AIS (By:12/2025) EANS 80% Ongoing EANS is par�cipa�ng in project ACADIA to ensure accordance. Ac�vi�es are ongoing in the project plan.
EANS Support to ACADIA 31/12/2025
SDP 5.3.1 INF10.7
Aeronau�cal Informa�on Exchange - Aerodrome mapping service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Ongoing
- Outside of the area of applicability. Nevertheless ANSP is par�cipa�ng in the ACADIA project and aerodrome mapping service is also in the scope.
31/12/2025
AIS (By:12/2025) EANS 10% Ongoing EANS is par�cipa�ng in the ACADIA project and aerodrome mapping service is also in the scope.
EANS Support to ACADIA 31/12/2025
SDP 5.3.1 INF10.8
Aeronau�cal Informa�on Exchange - Aeronau�cal Informa�on Features service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
8 Ongoing
- Ac�vi�es are part of ACADIA project. 31/12/2025
ASP (By:12/2025) EANS 0% Planned
Ac�vi�es part of ACADIA project. EANS Support to ACADIA 31/12/2025
AIS (By:12/2025) EANS 10% Ongoing
Ongoing, ac�vi�es part of ACADIA project. EANS Support to ACADIA 31/12/2025
LSSIP Year 2023 Estonia 54 Working Level Agreed
SDP 5.4.1 INF10.9
Meteorological Informa�on Exchange - Volcanic Ash Mass Concentra�on informa�on service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
3 Ongoing
- Implementa�on should be via ANSP co-opera�on ready for 31.12.2025. 31/12/2025
ASP (By:12/2025) EANS 0% Planned We are planning system upgrades to consume SWIM MET services, depends on MET service provider. - 31/12/2025
MET (By:12/2025) Estonian Environment Agency 3% Ongoing We are planning system upgrades to provide SWIM MET services, poten�al coopera�on with NamCon countries to be clarified during 2024. For the Volcanic Ash Mass Concentra�on Informa�on Service, it is clarified that this informa�on will be provided in SWIM format by the VAACs. The VAACs expects to be fully opera�onal by 2024; ESTEA as MET Provider will contact the UK MET Office and Meteo France in order to discuss the service defini�on in view of the future consump�on of the informa�on.
- 31/12/2025
SDP 5.4.1 INF10.10
Meteorological Informa�on Exchange - Aerodrome Meteorological informa�on Service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
47 Ongoing
- SWIM implementa�on should be ready on 2025. MET ANSP is serving AD and its users as demanded by IR (EU) 2017/373 using TAC/IWXXM. 31/12/2025
ASP (By:12/2025) EANS 0% Planned Depends on MET service provider. - 31/12/2025
APO (By:12/2025) TALLINN AIRPORT Ltd. 0% Planned AS Tallinna Lennujaam (Tallinn Airport Ltd.) is not MET service provider, the service is provided by Environmental Agency (Keskkonnaagentuur) from August 2020.
- 31/12/2024
MET (By:12/2025) Estonian Environment Agency 53% Ongoing MET ANSP is serving AD and its users as demanded by IR (EU) 2017/373 using TAC/IWXXM. - 31/12/2025
SDP 5.4.1 INF10.11
Meteorological Informa�on Exchange - En-Route and Approach Meteorological informa�on service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
5 Ongoing
- SWIM implementa�on should be ready in 2025. 31/12/2025
ASP (By:12/2025) EANS 0% Planned We are planning system upgrades to consume SWIM MET services. - 31/12/2025
MET (By:12/2025) Estonian Environment Agency 7% Ongoing We are planning to provide services accordingly SWIM MET services, poten�al coopera�on within NamCon countries for development. - 31/12/2025
LSSIP Year 2023 Estonia 55 Working Level Agreed
SDP 5.4.1 INF10.12
Meteorological Informa�on Exchange - Network Meteorological Informa�on Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Planned
- SWIM PKI etc. implementa�on should be ready in 2025. ATS ANSP is planning to consume SWIM MET services. 31/12/2025
ASP (By:12/2025) EANS 0% Planned We are planning system upgrades to consume SWIM MET services. - 31/12/2025
MET (By:12/2025)
Estonian Environment Agency 0% Not Applicable
ESTEA do not contribute in EUMETNET CBCF, so we are not mandated to provide the service. - -
SDP 5.5.1 INF10.13
Coopera�ve Network Informa�on Exchange - ATFCM Tac�cal Updates Service (Airport Capacity and Enroute) Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Not Applicable
- Not applicable. -
ASP (By:12/2025)
EANS 0% Not Applicable
Applies only if local complexity tool is used. N/A for this monitoring cycle. - -
SDP 5.5.1 INF10.14
Coopera�ve Network Informa�on Exchange – Flight Management Service (Slots and NOP/AOP integra�on) Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Not Applicable
- As per SDM instruc�ons, Estonia is not mandated to implement iAOP/eAOP (Tallinn Airport is exempted from the implementa�on of (i)AOP). Thereof this objec�ve is reported as Not Applicable,
-
ASP (By:12/2025)
EANS 0% Not Applicable
As per SDM instruc�ons as Estonia is not mandated to implement iAOP/eAOP, this Objec�ve can be reported as Not Applicable. - -
APO (By:12/2025)
TALLINN AIRPORT Ltd. 0% Not Applicable
Not planned either. - -
SDP 5.5.1 INF10.15
Coopera�ve Network Informa�on Exchange – Measures Service (Traffic Regula�on) Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Not Applicable
- Not applicable. -
ASP (By:12/2025)
LSSIP Year 2023 Estonia 56 Working Level Agreed
EANS 0% Not Applicable
Applies only if local complexity tool is used. N/A for this monitoring cycle. - -
SDP 5.5.1 INF10.16
Coopera�ve Network Informa�on Exchange - Short Term ATFCM Measures services (MCDM, eHelpdesk, STAM measures) Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Not Applicable
- Not applicable. -
ASP (By:12/2025)
EANS 0% Not Applicable
Applies only if local complexity tool is used. N/A for this monitoring cycle. - -
SDP 5.5.1 INF10.17
Coopera�ve Network Informa�on Exchange – Counts service (ATFCM Conges�on Points) Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Not Applicable
- Not applicable. -
ASP (By:12/2025)
EANS 0% Not Applicable
Applies only if local complexity tool is used. N/A for this monitoring cycle. - -
SDP 5.6.1 INF10.19
Flight Informa�on Exchange (Yellow Profile) - Flight Data Request Service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Planned
- Planned to reach objec�ve according to SP ac�vi�es. 31/12/2030
ASP (By:12/2025) EANS 0% Planned
LSSIP Year 2023 Estonia 57 Working Level Agreed
SDP 5.6.1 INF10.19
Flight Informa�on Exchange (Yellow Profile) - Flight Data Request Service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Planned
Planned to consume NM B2B services: - ARO briefing systems by 2024 - ac�vi�es ongoing. - ATM systems: TWR systems 2028 (according to CP1 not an obliga�on) and ACC 2030 - ac�vi�es planned. ATM system provider not fully decided. - rTWR: TBD (according to CP1 not an obliga�on). ARO systems: The system will be extended to support the submission of FPL and update messages via NM B2B using their FF-ICE services. The following transforma�ons are done from current message input to service: FilingService: FPL: FiledFlightPlanRequest CHG: FlightPlanUpdateRequest DLA: FlightPlanUpdateRequest CNL: FlightPlanCancella�onRequest TrialService: FPL valida�on only: TrialRequest FlightDataRequestService: RQP: FlightDataRequest RQS: FlightDataRequest No�fica�onService: DEP: FlightDepartureRequest ARR: FlightArrivalRequest When in the Center Terminal a message with above type is sent to the IFPS, then the corresponding B2B service is used for transmi�ng the data via FFICE service instead of AFTN/AMHS message. A system parameter allows to enable/disable the submission of the data via NM B2B. When disabled the message is sent out in the tradi�onal way via AFTN/AMHS ICAO text messages.
- 31/12/2030
SDP 5.6.1 INF10.20
Flight Informa�on Exchange (Yellow Profile) - No�fica�on Service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Planned
- Planned according to SP ac�vi�es. 31/12/2030
ASP (By:12/2025) EANS 0% Planned
LSSIP Year 2023 Estonia 58 Working Level Agreed
SDP 5.6.1 INF10.20
Flight Informa�on Exchange (Yellow Profile) - No�fica�on Service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Planned
Planned to consume NM B2B services (ATM systems and ARO briefing). - ARO briefing systems by 2025 - ac�vi�es ongoing. - ATM systems: TWR systems 2028 (not CP1 obliga�on) and ACC 2030 - ac�vi�es planned (ATM system provider not fully decided). - rTWR: TBD (not CP1 obliga�on). ARO systems: The system will be extended to support the submission of FPL and update messages via NM B2B using their FF-ICE services. The following transforma�ons are done from current message input to service: FilingService: FPL: FiledFlightPlanRequest CHG: FlightPlanUpdateRequest DLA: FlightPlanUpdateRequest CNL: FlightPlanCancella�onRequest TrialService: FPL valida�on only: TrialRequest FlightDataRequestService: RQP: FlightDataRequest RQS: Flight Data Request No�fica�onService: DEP: FlightDepartureRequest ARR: FlightArrivalRequest When in the Center Terminal a message with above type is sent to the IFPS, then the corresponding B2B service is used for transmi�ng the data via FFICE service instead of AFTN/AMHS message. A system parameter allows to enable/disable the submission of the data via NM B2B. When disabled the message is sent out in the tradi�onal way via AFTN/AMHS ICAO text messages.
- 31/12/2030
SDP 5.6.1 INF10.21
Flight Informa�on Exchange (Yellow Profile) - Data Publica�on Service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Planned
- Planned according to SP ac�vi�es. 31/12/2030
ASP (By:12/2025) EANS 0% Planned
LSSIP Year 2023 Estonia 59 Working Level Agreed
SDP 5.6.1 INF10.21
Flight Informa�on Exchange (Yellow Profile) - Data Publica�on Service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Planned
Planned to consume NM B2B services (ATM systems and ARO briefing). ARO systems will be ready by 2025, ATM systems by 2030. ARO systems: The system will be extended to support the submission of FPL and update messages via NM B2B using their FF-ICE services. The following transforma�ons are done from current message input to service: FilingService: FPL: FiledFlightPlanRequest CHG: FlightPlanUpdateRequest DLA: FlightPlanUpdateRequest CNL: FlightPlanCancella�onRequest TrialService: FPL valida�on only: TrialRequest FlightDataRequestService: RQP: FlightDataRequest RQS: FlightDataRequest No�fica�onService: DEP: FlightDepartureRequest ARR: FlightArrivalRequest When in the Center Terminal a message with above type is sent to the IFPS, then the corresponding B2B service is used for transmi�ng the data via FFICE service instead of AFTN/AMHS message. A system parameter allows to enable/disable the submission of the data via NM B2B. When disabled the message is sent out in the tradi�onal way via AFTN/AMHS ICAO text messages.
- 31/12/2030
SDP 5.6.1 INF10.23
Flight Informa�on Exchange (Yellow Profile) - Extended AMAN SWIM Service Timescales: Ini�al Opera�onal Capability: 01/01/2021 Full Opera�onal Capability / Target Date: 31/12/2025
0 Not Applicable
- N/A as there are no domes�c airports to which this applies (EETN AD is not CP1 AD). -
ASP (By:12/2025)
EANS 0% Not Applicable
N/A as there are no domes�c airports to which this applies. - -
ITY-ACID
Aircra� Iden�fica�on Timescales: Entry into force of the Regula�on: 13/12/2011 System capability: 02/01/2020
92 Ongoing
- EANS have sent template for Mode S Declara�on to NM on 30/01/2020, confirming that Mode S is implemented in Tallinn FIR above FL95. System will be fully implemented when neighbouring ANSP-s have the capability as well.
31/12/2024
LSSIP Year 2023 Estonia 60 Working Level Agreed
ITY-ACID
Aircra� Iden�fica�on Timescales: Entry into force of the Regula�on: 13/12/2011 System capability: 02/01/2020
92 Ongoing
ASP (By:01/2020) EANS 92% Ongoing EANS have sent template for Mode S Declara�on to NM on 30/01/2020, confirming that Mode S is implemented in Tallinn FIR above FL95. According to the response from NM, the system can only be implemented when neighbouring countries are ready. Will be fully implemented when neighbouring ANSP-s have the capability.
- 31/12/2024
ITY-AGDL
Ini�al ATC Air-Ground Data Link Services Timescales: Entry into force: 06/02/2009 ATS unit opera�onal capability: 05/02/2018 Aircra� capability: 05/02/2020
100 Completed
- Estonia implemented CPDLC in Tallinn FIR in June 2018. LOF and NAN implementa�on finished 30.12.2021. 30/12/2021
REG (By:02/2018) Estonian Transport Administra�on 100% Completed ECAA will ensure the processing and the distribu�on of the informa�on on the data link capability by the IFPS. - 30/04/2018
ASP (By:02/2018) EANS 100% Completed Implementa�on was finished in June 2018 (SITA 06.04.2018, ARINC 28.06.2018). Procedures implemen�ng the Next Authority process is implemented with Sweden, Finland (2021) and Latvia (2021).
Air-ground data link
implementa�on 30/12/2021
MIL (By:01/2019)
Estonian Air Force (MIL) 0% Not Applicable
Data link capability is not required. - -
ITY-AGVCS2
8,33 kHz Air-Ground Voice Channel Spacing below FL195 Timescales: Entry into force: 07/12/2012 New and upgraded radio equipment: 17/11/2013 New or upgraded radios on State aircra�: 01/01/2014 Interim target for freq. conversions: 31/12/2014 All radio equipment: 31/12/2017 All frequencies converted: 31/12/2018 State aircra� equipped, except those no�fied to EC: 31/12/2018 State aircra� equipped, except those exempted [Art 9(11)]: 31/12/2020
100 Completed
- Tallinn FIR radio renewed according to Implemen�ng Regula�on (EU) No 1079/2012 in December 2015. 31 frequencies converted on 02/01/2020. Estonia has 61 frequencies, from which 49 are converted as of 03/01/2020 (was reported to SAFIRE Data base). 9 frequencies are exempted (shall be converted on 2027), 3 are interna�onal frequencies, which should not be converted.
02/01/2020
REG (By:12/2018) Estonian Transport Administra�on 100% Completed Tallinn FIR radio renewed according to Implemen�ng Regula�on (EU) No 1079/2012 in December 2015. Frequency converted on 02/01/2020. - 02/01/2020
ASP (By:12/2018)
LSSIP Year 2023 Estonia 61 Working Level Agreed
ITY-AGVCS2
8,33 kHz Air-Ground Voice Channel Spacing below FL195 Timescales: Entry into force: 07/12/2012 New and upgraded radio equipment: 17/11/2013 New or upgraded radios on State aircra�: 01/01/2014 Interim target for freq. conversions: 31/12/2014 All radio equipment: 31/12/2017 All frequencies converted: 31/12/2018 State aircra� equipped, except those no�fied to EC: 31/12/2018 State aircra� equipped, except those exempted [Art 9(11)]: 31/12/2020
100 Completed
EANS 100% Completed Frequency converted on 02/01/2020. - 02/01/2020
MIL (By:12/2020) Estonian Air Force (MIL) 100% Completed All of the State aircra� are equipped with 8,33 kHz radios. - 31/12/2018
APO (By:12/2018) TALLINN AIRPORT Ltd. 100% Completed There are 2 working channels on EETN AD, what are converted accordingly. REF EST AIP AD 2.EETN, EETN AD 2.18. Non-8,33 kHz equipped vehicles do not communicate with aircra�s.
- 02/01/2020
Estonian Air Force (MIL) 0% Not Applicable
NATO combined frequency requirements will maintain the 122,100 MHz frequency in 25 kHz channel spacing un�l a suitable alterna�ve is found. - -
ITY-FMTP
Common Flight Message Transfer Protocol (FMTP) Timescales: Entry into force of regula�on: 28/06/2007 All EATMN systems put into service a�er 01/01/09: 01/01/2009 All EATMN systems in opera�on by 20/04/11: 20/04/2011 Transi�onal arrangements: 31/12/2012 Transi�onal arrangements when bilaterally agreed between ANSPs: 31/12/2014
100 Completed
- A common flight message transfer protocol (FMTP) is implemented during a major system upgrade. However, IPver6 is not fully implemented. Connec�ons with Malmö and Stockholm of Sweden are opera�onal since August 2015.
31/12/2018
ASP (By:12/2014) EANS 100% Completed Completed. - 31/12/2018
MIL (By:12/2014)
Estonian Air Force (MIL) 0% Not Applicable
Military ATC do not provide RADAR services - -
NAV03.1
RNAV 1 in TMA Opera�ons Timescales: Ini�al opera�onal capability: 01/01/2001 One SID and STAR per instrument RWY, where established: 25/01/2024 All SIDs and STARs per instrument RWY, where established: 06/06/2030
97 Ongoing
EETN - Tallinn Airport
LSSIP Year 2023 Estonia 62 Working Level Agreed
RNAV 1 procedures and CDA in Tallinn TMA implemented on 30 May 2013. Estonia’s PBN Implementa�on (transi�on) plan has successfully passed consulta�on with Estonian Stakeholders and with Network Manager (NM). The Plan has also been commented by IATA. PBN Implementa�on Plan Ver 1.0 document was approved by CAA and communicated to the neighbouring ATC Centres. Naviga�on infrastructure ra�onaliza�on project was delayed due to economic crises caused by COVID 19, project is ongoing.
21/03/2024
REG (By:06/2030) Estonian Transport Administra�on 100% Completed
The transi�on plan for PBN is approved by NSA in DEC 2020. Naviga�on
Infrastructure Ra�onalisa�on
31/12/2020
ASP (By:06/2030) EANS 96% Ongoing Estonia’s PBN Implementa�on (transi�on) plan has successfully passed consulta�on with Estonian Stakeholders and with Network Manager (NM). The Plan has also been commented by IATA. PBN Implementa�on Plan Ver 1.0 document was approved by CAA and communicated to the neighbouring ATC Centres. Naviga�on infrastructure ra�onalisa�on project is ongoing.
Naviga�on Infrastructure Ra�onalisa�on
21/03/2024
NAV03.2 RNP 1 in TMA Opera�ons Timescales: - not applicable -
0 Not Applicable
EETN - Tallinn Airport There is no inten�on to Implement it because it is not jus�fied par�cularly in terms of the cost/benefit ra�o as RNAV1 is considered to be sufficient. -
REG (By:06/2030)
Estonian Transport Administra�on 0% Not Applicable
There is no inten�on to Implement it because it is not jus�fied par�cularly in terms of the cost/benefit ra�o as RNAV1 is considered to be sufficient. - -
ASP (By:06/2030)
EANS 0% Not Applicable
There is no inten�on to Implement it because it is not jus�fied par�cularly in terms of the cost/benefit ra�o as RNAV1 is considered to be sufficient. - -
NAV10
RNP Approach Procedures to instrument RWY Timescales: Ini�al opera�onal capability: 01/06/2011 Instrument RWY ends without precision approach in EU SES States.: 03/12/2020 Instrument RWY ends served by precision approach.: 25/01/2024
100 Completed
EETN - Tallinn Airport RNP APCH procedures are published and implemented at EETN, EEKE, EEKA, EEPU and EETU aerodromes. EANS PBN Transi�on plan has been dra�ed and submited to CAA and MIL.
21/04/2022
REG (By:01/2024) Estonian Transport Administra�on 100% Completed The na�onal PBN plan is approved by NSA in DEC 2020. - 31/12/2020
ASP (By:01/2024) EANS 100% Completed
LSSIP Year 2023 Estonia 63 Working Level Agreed
NAV10
RNP Approach Procedures to instrument RWY Timescales: Ini�al opera�onal capability: 01/06/2011 Instrument RWY ends without precision approach in EU SES States.: 03/12/2020 Instrument RWY ends served by precision approach.: 25/01/2024
100 Completed
RNP APCH procedures are published and implemented at EETN, EEKE, EEKA, EETU and EEPU aerodromes. PBN Implementa�on (transi�on) plan is approved by ECAA.
RNP APCH procedures
implementa�on on EETN
aerodrome
21/04/2022
NAV12
ATS IFR Routes for Rotorcra� Opera�ons Timescales: Rotorcra� RNP0.3, RNP1 or RNAV1 ATS routes above FL150, where established.: 03/12/2020 One rotorcra� RNP0.3, RNP01 or RNAV1 SID and STAR per instrument RWY, where established.: 25/01/2024 Rotorcra� RNP0.3, RNP1 or RNAV1 ATS routes below FL150, where established.: 25/01/2024 All rotorcra� RNP0.3, RNP01 or RNAV1 SIDs and STARs per instrument RWY, where established.: 06/06/2030
0 Not Applicable
- Tallinn FIR is FRA. ATS IFR routes for rotorcra� opera�on implementa�on are not planned. -
REG (By:06/2030)
Estonian Transport Administra�on 0% Not Applicable
Tallinn FIR is FRA. ATS IFR routes for rotorcra� opera�on implementa�on are not planned, no demand, too exiguous IFR rotocra� traffic. - -
ASP (By:06/2030)
EANS 0% Not Applicable
LLR procedures only in Tallinn CTR are completed. No other plans to implement. - -
LSSIP Year 2023 Estonia 64 Working Level Agreed
Additional Objectives for ICAO ASBU Monitoring
AOM21.1
Direct Rou�ng (Outside Applicability Area) Timescales: - not applicable -
0 Not Applicable
- Estonia is outside for the objec�ve applicability area. FRA is implemented. -
ASP (By:12/2017)
EANS 0% Not Applicable
FRA is implemented. - -
ATC02.2
Implement ground based safety nets - Short Term Conflict Alert (STCA) - level 2 for en-route opera�ons Timescales: Ini�al opera�onal capability: 01/01/2008 Full opera�onal capability: 31/01/2013
100 Completed
- STCA Level II func�on was implemented in 2012 and safety assessment was performed. Safety oversight was conducted on �me.
31/12/2012
ASP (By:01/2013) EANS 100% Completed The EUROCAT 2000 System has STCA implemented and opera�onal (Ini�al Opera�onal Capability). The STCA Level 2 was implemented and opera�onal since 2002. FOC was implemented in March 2012.
- 31/12/2012
ATC02.9
Short Term Conflict Alert (STCA) for TMAs Timescales: Ini�al opera�onal capability: 01/01/2018 Full opera�onal capability: 31/12/2020
100 Completed
- STCA func�on is implemented. 31/12/2012
ASP (By:12/2020) EANS 100% Completed STCA func�on is implemented. - 31/12/2012
ATC16
Implement ACAS II compliant with TCAS II change 7.1 Timescales: Ini�al opera�onal capability: 01/03/2012 Full opera�onal capability: 31/12/2015
100 Completed
- ACAS II compliant with TCAS II change 7.1 is implemented on �me. 04/01/2019
REG (By:12/2015) Estonian Transport Administra�on 100% Completed ECAA has supervised compliance with regulatory provisions for ACAS II (TCAS II version 7.1). - 31/12/2015
ASP (By:03/2012) EANS 100% Completed The ATC staff was trained in December 2015. - 31/12/2015
MIL (By:12/2015) Estonian Air Force (MIL) 100% Completed Estonian Air Force M-28 transport-type aircra� are TCAS II 7.1 equipped. - 04/01/2019
LSSIP Year 2023 Estonia 65 Working Level Agreed
COM10.1
Migrate from AFTN to AMHS (Basic service) Timescales: Ini�al Opera�onal Capability: 01/12/2011 Full Opera�onal Capability: 31/12/2018
100 Completed
- Exis�ng COM centres are upgraded to provide AMHS capability or implement EATMP Communica�ons Gateway (ECG). 31/12/2018
ASP (By:12/2018) EANS 100% Completed The migra�on took place in August 2016. - 31/12/2018
FCM01
Implement enhanced tac�cal flow management services Timescales: Ini�al opera�onal capability: 01/08/2001 Full opera�onal capability: 31/12/2006
100 Completed
- Since May 2008, Estonia is in the IFPS zone. Currently only the FMP is connected to NM. During the major system upgrade, all the requirements were implemented in 2012. FSA, CPR format tuning and tes�ng completed. NM/ETFMS supplies with flight plan related updates that are only available shortly before departure.
30/06/2015
ASP (By:07/2014) EANS 100% Completed All necessary func�onali�es are installed during system upgrade. Tuning, tes�ng and LoA revision completed. - 30/06/2015
ITY-COTR
Implementa�on of ground-ground automated co- ordina�on processes Timescales: Entry into force of Regula�on: 27/07/2006 For pu�ng into service of EATMN systems in respect of no�fica�on and ini�al coordina�on processes: 27/07/2006 For pu�ng into service of EATMN systems in respect of Revision of Coordina�on, Abroga�on of Coordina�on, Basic Flight Data and Change to Basic Flight Data: 01/01/2009 To all EATMN systems in opera�on by 12/2012: 31/12/2012
100 Completed
- Implementa�on of G-G automated co-ordina�on has been finalised within Eurocat 2000 upgrade project in 2012. 31/12/2012
ASP (By:12/2012) EANS 100% Completed OLDI basic messages exchange is implemented. Other ground-ground automated coordina�on processes and the training of ATC personnel have been performed.
- 31/12/2012
MIL (By:12/2012)
Estonian Air Force (MIL) 0% Not Applicable
OLDI not required as EAF currently provides only ADI service. Other ground- ground automated coordina�on is planned. - -
LSSIP Year 2023 Estonia 66 Working Level Agreed
Local Objectives
Note: Local Objectives are addressing solutions that are considered beneficial for specific operating environments, therefore for which a clear widespread commitment has not been expressed yet. They are characterised with no deadline and voluntary applicability area.
AOP14.1 Remote Tower Services Applicability and timescale: Local 40 Ongoing
EETN - Tallinn Airport EANS (not EETN AD) runs rTWR implementa�on project. - The Remote Tower Center is in Tallinn, in EANS headquarters. Two airports' (Kuressaare and Tartu) remote tower installa�ons are ready, governing body Estonian Transporta�on Administra�on has issued aeronau�cal equipment cer�ficate separately for both installa�ons. Remote tower for Tartu aerodrome went fully opera�onal in April 2023, since then the service has been provided only from the remote tower center in Tallinn. Service valida�on ac�vi�es for Kuressaare aerodrome's remote tower started in November 2023. Kuressaare remote tower is expected to be opera�onal in March 2024. - Future: The Remote Tower Centre is planned for all four Estonian regional aerodromes (Tartu, Kuressaare, Kärdla and Pärnu (not planned for EETN AD)). - For daily service provision.
31/03/2024
REG (By:) Estonian Transport Administra�on Ongoing EANS (not EETN AD) runs rTWR implementa�on project. - The Remote Tower Center is in Tallinn, in EANS headquarters. Two airports' (Kuressaare and Tartu) remote tower installa�ons are ready, governing body Estonian Transporta�on Administra�on has issued aeronau�cal equipment cer�ficate separately for both installa�ons. Remote tower for Tartu aerodrome went fully opera�onal in April 2023, since then the service has been provided only from the remote tower center in Tallinn. Service valida�on ac�vi�es for Kuressaare aerodrome's remote tower (rAFIS) started in November 2023. Kuressaare remote tower is expected to be opera�onal in March 2024. - Future: The Remote Tower Centre is planned for all four Estonian regional aerodromes (Tartu, Kuressaare, Kärdla and Pärnu (not planned for EETN AD)). - For daily service provision.
- 31/03/2024
ASP (By:) EANS Ongoing EANS (not EETN AD) runs rTWR implementa�on project. - The Remote Tower Center is in Tallinn, in EANS headquarters. Two airports' (Kuressaare and Tartu) remote tower installa�ons are ready, governing body Estonian Transporta�on Administra�on has issued aeronau�cal equipment cer�ficate separately for both installa�ons. Remote tower for Tartu aerodrome went fully opera�onal in April 2023, since then the service has been provided only from the remote tower center in Tallinn. Service valida�on ac�vi�es for Kuressaare aerodrome's remote tower were star�ng in November 2023. Kuressaare remote tower is expected to be opera�onal in March 2024. - The Remote Tower Centre is planned for all four Estonian regional aerodromes – Tartu, Kuressaare, Kärdla and Pärnu (not planned for EETN AD). - For daily service provision.
- 31/03/2024
APO (By:) TALLINN AIRPORT Ltd. Ongoing
LSSIP Year 2023 Estonia 67 Working Level Agreed
AOP14.1 Remote Tower Services Applicability and timescale: Local 40 Ongoing
EANS (not EETN AD) runs rTWR implementa�on project. Project is connected to Tallinn Airports Ltd-s ac�vi�es, since all regional airports are under Tallinn Airport Ltd.
- 31/03/2024
AOP15
Enhanced traffic situa�onal awareness and airport safety nets for the vehicle drivers Applicability and timescale: Local
0 Not Applicable
- Not planned. -
REG (By:04/2019)
Estonian Transport Administra�on Not Applicable
Not planned. - - APO (By:)
TALLINN AIRPORT Ltd. Not Applicable
Not planned. - -
AOP16 Guidance assistance through airfield ground ligh�ng Applicability and timescale: Local
0 Not Applicable
- Not planned. -
ASP (By:)
EANS Not Applicable
Not planned. - - APO (By:)
TALLINN AIRPORT Ltd. Not Applicable
Not planned. - -
AOP17
Provision/integra�on of departure planning informa�on to NMOC Applicability and timescale: Local
0 Not Applicable
- NA for State. EANS and Tallinn airport postponed the implementa�on of A-CDM at Tallinn aerodrome. A-CDM should be implemented in the frame of project Airport 4.0 and implementa�on probably not earlier than 31.12.2030.
-
ASP (By:)
EANS Not Applicable
EANS and Tallinn airport postponed the implementa�on of A-CDM at Tallinn aerodrome. A-CDM should be implemented in the frame of project Airport 4.0 and implementa�on probably not earlier than 31.12.2030.
- -
AOP18 Runway Status Lights (RWSL) Applicability and timescale: Local
0 Not Applicable
- Traffic density does not jus�fy the implementa�on of the Objec�ve and we`ll keep status N/A. -
REG (By:)
LSSIP Year 2023 Estonia 68 Working Level Agreed
AOP18 Runway Status Lights (RWSL) Applicability and timescale: Local
0 Not Applicable
Estonian Transport Administra�on Not Applicable
Traffic density does not jus�fy the implementa�on of the Objec�ve. - - ASP (By:)
EANS Not Applicable
Traffic density does not jus�fy the implementa�on of the Objec�ve. - - APO (By:)
TALLINN AIRPORT Ltd. Not Applicable
Traffic density does not jus�fy the implementa�on of the Objec�ve. - -
AOP21
Wake Turbulence Separa�ons for Arrivals based on Sta�c Aircra� Characteris�cs (S-PWS-A) Applicability and timescale: Local
0 Not Applicable
- No opera�onal need at the moment. -
ASP (By:)
EANS Not Applicable
No opera�onal needs at the moment. - -
AOP23 Integrated runway sequence for full traffic op�miza�on on single and mul�ple runway airports Applicability and timescale: Local
0 Not yet planned
EETN - Tallinn Airport N/A for EETN AD, Tallinn Airport is not listed in CP1 Geographical Scope. AD has not planned it (yet). -
ASP (By:)
EANS Not yet planned
Depends on Tallinn airport plans. - - APO (By:)
TALLINN AIRPORT Ltd. Not yet planned
Not yet planned. - -
AOP25 De-icing management tool Applicability and timescale: Local 0 Not yet
planned
EETN - Tallinn Airport Development according to SP-s ac�vi�es. -
ASP (By:)
EANS Not yet planned
Further plans depend on EETN airport. - - APO (By:)
TALLINN AIRPORT Ltd. Not yet planned
Not yet planned. - -
LSSIP Year 2023 Estonia 69 Working Level Agreed
AOP26
Reduced separa�on based on local Runway Occupancy Time (ROT) characterisa�on Applicability and timescale: Local
0 Not Applicable
- N/A, not planned either. -
ASP (By:)
EANS Not Applicable
Local objec�ve, not planned. - -
ATC18 Mul�-Sector Planning En-route - 1P2T Applicability and timescale: Local 0 Not
Applicable
- N/A, but objec�ve might come into the plans, in case FINEST realizes. -
ASP (By:01/2030)
EANS Not Applicable
N/A - -
ATC20 Enhanced STCA with down-linked parameters via Mode S EHS Applicability and timescale: Local
0 Not Applicable
- Estonia is outside of applicability area. SFL via Mode-S EHS is implemented. No need for enhancement of STCA with selected flight level is iden�fied.
-
REG (By:01/2030)
Estonian Transport Administra�on Not Applicable
Estonia is outside of applicability area. - - ASP (By:01/2030)
EANS Not Applicable
SFL via Mode S EHS is implemented. No need for enhancement of STCA with selected flight level is iden�fied. - -
ATC26 Point Merge in complex TMA Applicability and timescale: Local 0 Not
Applicable
EETN - Tallinn Airport Not planned. -
ASP (By:)
EANS Not Applicable
No plans to implement. - -
COM13 Air Traffic Services (ATS) datalink using SatCom Class B Applicability and timescale: Local 0 Not yet
planned
- Subject to local need, It has not yet been decided whether ANSP will par�cipate in the test phase. -
REG (By:)
Estonian Transport Administra�on Not Applicable
LSSIP Year 2023 Estonia 70 Working Level Agreed
COM13 Air Traffic Services (ATS) datalink using SatCom Class B Applicability and timescale: Local 0 Not yet
planned
N/A, and it has not yet been decided whether ANSP will par�cipate in the test phase. - -
ASP (By:)
EANS Not yet planned
NYP, lack of resources at the moment. - -
ENV02 Airport Collabora�ve Environmental Management Applicability and timescale: Local 100 Completed
EETN - Tallinn Airport Tallinn Airport has implemented Collabora�ve Environmental Management (CEM). 31/12/2016
ASP (By:) EANS Completed Completed - 31/12/2016
APO (By:) TALLINN AIRPORT Ltd. Completed Completed - 31/12/2016
ENV03 Con�nuous Climb Opera�ons (CCO) Applicability and timescale: Local 0 Not
Applicable
EETN - Tallinn Airport Not applicable at State level. Nevertheless, EETN AD has got the noise abatement procedures, what are applicable below the al�tude of 3000 � AMSL. REF EST AIP EETN AD 2.21.
-
ASP (By:)
EANS Not Applicable
Not applicable at State level. - - APO (By:)
TALLINN AIRPORT Ltd. Not Applicable
Not applicable at State level. - -
NAV11.1
Implement precision approach procedures using GBAS CAT II based on GAST C Applicability and timescale: Local
0 Not Applicable
- Subject to local need, not planned. -
REG (By:)
Estonian Transport Administra�on Not Applicable
ANSP has no plans to implement. - - ASP (By:)
EANS Not Applicable
EANS has no plans to implement precision approach procedures using GBAS CAT II based on GAST C. Considering the traffic capacity, it is not reasonable. - -
LSSIP Year 2023 Estonia 71 Working Level Agreed
SAF10.1 Implement measures to reduce the risk to aircra� opera�ons caused by airspace infringements Applicability and timescale: Local
30 Ongoing
- Ac�vity ongoing. 31/12/2030
REG (By:) Estonian Transport Administra�on Ongoing NIL - 31/12/2030
ASP (By:) EANS Ongoing According to EAPAIRR ques�onnaire, some of the parts of the European Ac�on Plan for Airspace Infringement Risk Reduc�on, are completed, some are ongoing and not yet planned.
- 31/12/2030
AIS (By:) EANS Ongoing Improving availability and access of VFR en-route charts ongoing, planned to analyse GPS moving maps on portable devices. AIM1 in SAF EAPAIRR ques�onnaire ongoing.
- 31/12/2025
SAF11.1 Improve Runway Safety by Preven�ng Runway Excursions Applicability and timescale: Local 100 Completed
- Since not all the ac�vi�es are reasonable to implement and some are constantly ongoing (others completed), we have considered this area Completed. 31/12/2023
REG (By:) Estonian Transport Administra�on Completed Some ASP_EANS ac�vi�es are constantly ongoing, others are completed. It has decided not to plan Approach Path Management (depending on the future traffic types/amount- thus plans might change).
- -
ASP (By:) EANS Completed GAPPRE Recommenda�ons ANSP3 and ANSP6 are constantly ongoing as they are part of the safety everyday work in ANSP. Other Recommenda�ons for ANSP completed.
- -
APO (By:) TALLINN AIRPORT Ltd. Completed Relevant/selected safety recommenda�ons from the Global Ac�on Plan for the Preven�on of Runway Excursions for their relevance against the local condi�ons and specific context have been assessed and implemented. Approach Path Management is not planned.
- 31/12/2023
LSSIP Year 2023 Estonia 72 Working Level Agreed
Annex A: Specialists involved in the ATM implementa�on repor�ng for Estonia
LSSIP Focal Points Organisa�on Name
LSSIP Na�onal Focal Point Estonian Transport Administra�on
Moonika KÄST
LSSIP Focal Point for NSA Estonian Transport Administra�on
Moonika KÄST
LSSIP Focal Point for ANSP Estonian ANS Kei� MERIKÜLL
LSSIP Focal Point for Airport Tallinn Airport Ilona SOITU
LSSIP Focal Point for Military Estonian Defence Forces Air Force
David-Andreas MELLOV
LSSIP Focal point for MET Estonian Environment Agency Jüri JOONAS
Other Focal Points Organisa�on Name
Focal Point for NETSYS EANS (Estonian ANS) Brenda ROOSIMAA
Focal Point for SUR EANS (Estonian ANS) Steve SÕERUER
Focal Point for SDP/CP1 EANS (Estonian ANS) Kei� MERIKÜLL
Focal Point for U-space Estonian Transport Administra�on
Priit RIFK
LSSIP Year 2023 Estonia 73 Working Level Agreed
Annex B: Ques�onnaires
1. Surveillance (SUR) Ques�onnaire This Annex is not published in the LSSIP Document, but is available in the LSSIP Tool, which can be made available upon request to Focal Point and/or Contact Person.
LSSIP Year 2023 Estonia 74 Working Level Agreed
2. EAPAIRR and GAPPRE Ques�onnaire
European Action Plan for Airspace Infringement Risk Reduction
This Annex is not published in the LSSIP Document, but is available in the LSSIP Tool, which can be made available upon request to Focal Point and/or Contact Person.
LSSIP Year 2023 Estonia 75 Working Level Agreed
3. SESAR Solu�ons implemented in a voluntary way3
This Annex is not published in the LSSIP Document, but is available in the LSSIP Tool, which can be made available upon request to Focal Point and/or Contact Person.
3 Referred as ‘Non-committed’ SESAR solutions in the MP L3 Report.
LSSIP Year 2023 Estonia 76 Working Level Agreed
Annex C: Implementa�on Objec�ves’ links with other plans
The table below (extracted from the MPL3 Plan 2023) shows for each implementation objective, the mapping of the L3 implementation Objectives to the corresponding SESAR Essential Operational Changes, the SESAR Solutions, the Deployment Program families, the ICAO ASBU, the EASA EPAS, the Network Strategy Plan, the Airspace Architecture Study Transition Plan (AAS TP) Milestones and the SESAR Key Features.
Level 3
Implementation Objective
SESAR Solution
SDP Family
OI Steps/ Enablers
ICAO ASBUs EPAS NSP AAS TP KF
ATC21 – Composite surveillance ADS- B/WAM
#114 -
CTE-S06, CTE-S05,
CTE-S03a, CTE-S03b, CTE-S04a
ASUR- B0/1
ASUR- B0/2
RMT.067 9
RMT.051 9
SO8/3 SO8/4 AM-1.17 EAI
COM10.2 – Extended AMHS - - CTE-C06c COMI-
B0/7 - SO7/4 - EAI
COM11.1 – Voice over Internet Protocol (VoIP) in En-Route
- - CTE-C05a CTE‐C05b
COMI- B2/1 - SO8/4 AM-1.3 EAI
COM11.2 – Voice over Internet Protocol (VoIP) in Airport/Terminal
- - CTE-C05a CTE‐C05b
COMI- B2/1 - SO8/4 - EAI
COM13 – Air Traffic Services (ATS) datalink using SatCom Class B
#109 - POI-0018- COM
COMI- B1/3 - - AM-1.16 EAI
ITY-ACID – Aircraft identification - - GSURV‐0101 - - SO8/2 - EAI
ITY-AGDL – Initial ATC air-ground data link services
- - AUO-0301
COMI- B0/4
COMI- B1/2
RMT.052 4
SO4/1 SO8/3 AM-1.1 EAI
ITY-AGVCS2 – 8.33 kHz Air-Ground Voice Channel Spacing below FL195
- - CTE-C01a - - SO8/1 - EAI
NAV10 – RNP Approach Procedures to instrument RWY
#103 -
AOM-0602 AOM-0604 CTE-N06a CTE-N06b
APTA- B0/1
APTA- B1/1
NAVS- B0/2
RMT.044 5
RMT.064 3
SO6/5 - AAT S
NAV11.2 – Implement precision approach procedures using GBAS CAT II/III based
#55 - AO-0505-A NAVS- B1/1
RMT.068 2 - - HPA
O
LSSIP Year 2023 Estonia 77 Working Level Agreed
Level 3
Implementation Objective
SESAR Solution
SDP Family
OI Steps/ Enablers
ICAO ASBUs EPAS NSP AAS TP KF
on GPS L1 and/or GALILEO E1
Level 3 Implementation
Objective
SESAR Solution
SDP Family
OI Steps/Enabler
s
ICAO ASBUs EPAS NSP AAS TP KF
AOM13.1 – Harmonise OAT and GAT handling
- - AOM-0301 AOM-0303 - - SO6/2 - OAN
S
AOP11.1 – Initial Airport Operations Plan
#21 2.2.1 AO-0801-A ACDM- B1/1 - SO6/2 - HPA
O
AOP11.2 – Extended Airport Operations Plan
#21 2.2.2
AO-0801-A, AO-0802-A, AO-0803, DCB-0310
ACDM- B1/1 - SO5/2 - HPA
O
AOP17 – Provision/integration of DPI to NMOC
#61 - DCB-0304 NOPS- B0/4 - - - HPA
O
COM12 – NewPENS - - CTE‐C06b COMI- B1/1 -
SO2/3, SO2/4, SO8/3, SO8/4
- EAI
FCM03 – Collaborative flight planning
- - IS-0102 NOPS- B0/2 - SO4/3 AM-1.14 OAN
S
FCM04.2 – Enhanced Short Term ATFCM Measures
#17 4.1.1 DCB-0308 NOPS- B1/1 - SO4/5 AM-1.11 OAN
S
FCM06.1 – Automated Support for Traffic Complexity Assessment and Flight Planning interfaces
#19 PJ.18-
02c 4.3.1
CM-0101 CM-0103-A
IS-0102
NOPS- B0/2
NOPS- B1/4
- SO4/3 SO4/5 AM-1.13 OAN
S
FCM10 – Interactive rolling NOP
#18 #20 4.2.1 DCB-0102
DCB-0208
NOPS- B1/2
NOPS- B1/9
- SO2/2, SO4/2, SO4/5
AM-1.9 AM-1.12
OAN S
FCM11.1 – Initial AOP/NOP Information Sharing
#20 #21 4.2.2 DCB-0103-A
AO-0801-A NOPS- B0/4 -
SO4/4, SO4/5, SO5/2
AM-1.12 OAN S
LSSIP Year 2023 Estonia 78 Working Level Agreed
Level 3 Implementation
Objective
SESAR Solution
SDP Family
OI Steps/Enabler
s
ICAO ASBUs EPAS NSP AAS TP KF
FCM11.2 – AOP/NOP integration
#18 #20 #21
4.4.1
AO-0801–A, AO-0802–A,
AO-0803, DCB-0310,
DCB-0103-A, DCB-0208
NOPS- B1/3 -
SO4/4, SO4/5, SO5/2
AM-1.12 OAN S
INF10.2 – Stakeholders’ SWIM PKI and cyber security
#46 5.2.1 IS-0901-A SWIM- B2/3
RMT.072 0 SO2/4 AM-1.5 EAI
INF10.3 – Aeronautical Information Exchange - Airspace structure service
#46 5.3.1 IS-0901-A - - SO2/4 AM-1.5 EAI
INF10.4 – Aeronautical Information Exchange - Airspace availability service
#46 5.3.1 IS-0901-A - - SO2/4 AM-1.5 EAI
INF10.5 – Aeronautical Information Exchange - Airspace Reservation (ARES) service
#46 5.3.1 IS-0901-A - - SO2/4 AM-1.5 EAI
INF10.6 – Aeronautical Information Exchange - Digital NOTAM service
#34 #46 5.3.1 IS-0901-A
IS-0205 - - SO2/4 AM-1.5 EAI
INF10.7 – Aeronautical Information Exchange - Aerodrome Mapping information exchange service
#34 #46 5.3.1 IS-0901-A
IS-0205 - - SO2/4 AM-1.5 EAI
INF10.8 – Aeronautical Information Exchange - Aeronautical Information Features service
#34 #46 5.3.1 IS-0901-A
IS-0205 - - SO2/4 AM-1.5 EAI
INF10.9 – Meteorological Information Exchange - Volcanic ash concentration service
#34 #35 #46
5.4.1 IS-0901-A IS-0205
MET-0101 - - SO2/4 AM-1.5 EAI
LSSIP Year 2023 Estonia 79 Working Level Agreed
Level 3 Implementation
Objective
SESAR Solution
SDP Family
OI Steps/Enabler
s
ICAO ASBUs EPAS NSP AAS TP KF
INF10.10 – Meteorological Information Exchange - Aerodrome Meteorological information Service
#34 #35 #46
5.4.1 IS-0901-A IS-0205
MET-0101 - - SO2/4 AM-1.5 EAI
INF10.11 – Meteorological Information Exchange - En-Route and Approach Meteorological information service
#34 #35 #46
5.4.1 IS-0901-A IS-0205
MET-0101 - - SO2/4 AM-1.5 EAI
INF10.12 – Meteorological Information Exchange - Network Manager Meteorological Information
#34 #35 #46
5.4.1 IS-0901-A IS-0205
MET-0101 - - SO2/4 AM-1.5 EAI
INF10.13 – Cooperative Network Information Exchange - ATFCM Tactical Updates Service
#46 5.5.1 IS-0901-A - - SO2/4 AM-1.5 EAI
INF10.14 – Cooperative Network Information Exchange - Flight Management Service
#46 5.5.1 IS-0901-A - - SO2/4 SO5/2 AM-1.5 EAI
INF10.15 – Cooperative Network Information Exchange - Measures Service
#46 5.5.1 IS-0901-A - - SO2/4 SO4/5 AM-1.5 EAI
INF10.16 – Cooperative Network Information Exchange - Short Term ATFCM Measures services
#46 5.5.1 IS-0901-A - - SO2/4 SO4/5 AM-1.5 EAI
INF10.17 – Cooperative Network Information Exchange - Counts service
#46 5.5.1 IS-0901-A - - SO2/4 AM-1.5 EAI
INF10.18 – Flight Information Exchange -Filing Service
#46 5.6.1 AUO-0207 FICE- B2/2 - SO2/4 AM-1.5 EAI
INF10.19 – Flight Information Exchange #46 5.6.1 AUO-0207 FICE-
B2/4 - SO2/4 AM-1.5 EAI
LSSIP Year 2023 Estonia 80 Working Level Agreed
Level 3 Implementation
Objective
SESAR Solution
SDP Family
OI Steps/Enabler
s
ICAO ASBUs EPAS NSP AAS TP KF
- Flight Data Request Service
INF10.20 – Flight Information Exchange - Notification Service
#46 5.6.1 AUO-0207 FICE- B2/5 - SO2/4 AM-1.5 EAI
INF10.21 – Flight Information Exchange - Publication Service
#46 5.6.1 AUO-0207 FICE- B2/6 - SO2/4 AM-1.5 EAI
INF10.22 – Flight Information Exchange - Trial Service
#46 5.6.1 AUO-0219 FICE- B2/3 - SO2/4 AM-1.5 EAI
INF10.23 – Flight Information Exchange - Extended AMAN SWIM Service
#46 5.6.1 AUO-0207
DAIM- B2/1
SWIM- B3/1
- SO2/4 AM-1.5 EAI
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
INF07 – Electronic Terrain and Obstacle Data (e-TOD)
- - AIMS-16
DAIM- B1/3
DAIM- B1/4
RMT.070 3
RMT.072 2
SO2/5 - EAI
INF11.1 – Enhanced Ground Weather Management System (GWMS) as local 4DWxCube
PJ.18- 04b-01 - POI-0044-
MET - - - - EAI
INF11.2 – Cb-global capability and service
PJ.18- 04b-02 - POI-0048-
MET - - - - EAI
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
AOP04.1 – A-SMGCS Surveillance Service (former ICAO Level 1)
#70 #110 -
AO-0201 AO-0201-A POI-0071-
SUR
SURF- B0/2
MST.002 9 SO6/6 - HPA
O
LSSIP Year 2023 Estonia 81 Working Level Agreed
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
AOP04.2 – A-SMGCS RMCA (former ICAO Level 2)
- - AO-0102 SURF- B0/3
MST.002 9 SO6/6 - HPA
O
AOP05 – Airport CDM - -
AO-0501, AO-0601, AO-0602, AO-0603, TS-0201
ACDM- B0/1
ACDM- B0/2
NOPS- B0/4
- SO6/4 - HPA O
AOP10 – Time Based Separation #64 - AO-0303 WAKE-
B2/7 - SO6/5 - HPA O
AOP12.1 – Airport Safety Nets #02 2.3.1 AO-0104-A SURF-
B1/3 MST.002
9 SP6/6 - HPA O
AOP13 – Automated assistance to Controller for Surface Movement planning and routing
#22 #53 - AO-0205
TS-0202 SURF- B1/4
MST.002 9 SO6/6 - HPA
O
AOP15 – Safety Nets for vehicle drivers #04 - AO-0105
AO-0204 SURF- B2/2
MST.002 9 - - HPA
O
AOP16 – Guidance assistance through airfield lighting
#47 - AO-0222-A SURF- B1/1
MST.002 9 - - HPA
O
AOP18 – Runway Status Lights #01 - AO-0209
SURF- B2/2, SURF- B2/3-
MST.002 9 - - HPA
O
AOP19 – Departure Management Synchronised with Pre-departure sequencing
#53 #106 2.1.1 AO-0602
TS-0201 RSEQ- B0/2 - - - HPA
O
AOP20 – Wake Turbulence Separations for Departures based on Static Aircraft Characteristics (S- PWS-D)
PJ.02-01- 06 - AO-0323 - RMT.047
6 - - HPA O
AOP21 – Wake Turbulence Separations for Arrivals based on Static Aircraft Characteristics (S- PWS-A)
PJ.02-01- 04 - AO-0306 WAKE-
B3/3 RMT.047
6 - - HPA O
LSSIP Year 2023 Estonia 82 Working Level Agreed
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
AOP22 – Minimum pair separations based on SRP
PJ.02-03 - AO-0309 - - - - HPA O
AOP23 – Integrated runway sequence for full traffic optimization on single and multiple runway airports
PJ.02-08- 01 - TS-0301 RSEQ-
B2/1 - - - HPA O
AOP24 – Optimised use of runway configuration for multiple runway airports
PJ.02-08- 02 - TS-0313 - - - - HPA
O
AOP25 – De-icing Management Tool #116 - POI-0070-
AO - - - - HPA O
AOP26 – Reduced separation based on local Runway Occupancy Time (ROT) characterisation
PJ.02-08- 03 - AO-0337 - - - - HPA
O
ATC07.1 – Arrival management tools - - TS-0102 RSEQ-
B0/1 - SO4/1 - AAT S
ATC19 – Enhanced AMAN-DMAN integration
#54 1.2.1 TS-0308 RSEQ- B2/1 - SO6/5
SO4/1 - EAI
ATC26 – Point Merge in complex TMA #107 - AOM-0601 RSEQ-
B0/3 - - - AAT S
ENV01 – Continuous Descent Operations #11 -
AOM-0701 AOM-0702-
A
APTA- B0/4
APTA- B1/4
- SO6/5 - AAT S
ENV02 – Airport Collaborative Environmental Management
- - AO-0703, AO-0705, AO-0706
- - - - HPA O
ENV03 – Continuous Climb Operations - - AOM-0703
APTA- B0/5
APTA- B1/5
- SO6/5 - AAT S
NAV03.1 – RNAV1 in TMA Operations #62 - AOM-0601
CTE-N08 APTA- B0/2
RMT.044 5 SO6/5 - AAT
S
NAV03.2 – RNP1 in TMA Operations #09 - AOM-0603
AOM-0605 APTA- B1/2
RMT.044 5 SO6/5 - AAT
S
LSSIP Year 2023 Estonia 83 Working Level Agreed
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
#51 PJ.14-03-
04
POI-0032- NAV
NAV11.1 – GLS CAT II operations using GBAS GAST-C
#119 - AO-0506 NAVS- B1/1
RMT.068 2
RMT.379 - - HPA
O
SAF11.1 – Improve runway safety by preventing runway excursions
- - - - - - - HPA O
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
AOM19.4 – Management of Pre- defined Airspace Configurations
#31 #66 3.1.2
AOM-0202- A
AOM-0206- A
CM-0102-A
FRTO- B1/4, NOPS- B1/6
- SO3/2 SO3/3
AM-1.10 AM-1.8-
OAN S
AOM19.5 – ASM and A-FUA
#31 #66 3.1.1
AOM-0202 AOM-0202-
A AOM-0206-
A
NOPS B1/5, NOPS B0/1, FRTO B1/3, FRTO B0/2
- SO3/2 SO3/3
AM-1.10 AM-1.8
OAN S
AOM21.2 – Initial Free Route Airspace
#32 #33 #66
3.2.1 AOM-0501 AOM-0505 CM-0102-A
FRTO- B1/1 - SO3/1
SO3/4 AM-1.10 AM-5.1
AAT S
AOM21.3 – Enhanced Free Route Airspace Operations
#33 PJ.06-01 3.2.2 AOM-0501
AOM-0505 FRTO- B2/3 - SO3/1
SO3/4 AM-1.6 AM-1.7
AAT S
ATC12.1 – MONA, TCT and MTCD
#27 #104 -
CM-0202, CM-0203, CM-0205,
CM-0207-A
FRTO- B0/4
FRTO- B1/5
- SO3/1 SO4/1
AM-1.15 AM-5.1
AAT S
ATC15.1 – Initial Extension of AMAN to En-route
- - TS-0305 - - SO4/1 - AAT S
ATC15.2 – Arrival Management #05 1.1.1 TS-0305-A RSEQ-
B1/1 - SO4/1 AM-1.3 AAT S
LSSIP Year 2023 Estonia 84 Working Level Agreed
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
Extended to En-route Airspace
NOPS- B1/8
ATC18 – Multi Sector Planning En-route – 1P2T
#63 #118
- CM-0301 FRTO-
B1/6 - SO4/1 AM-4.3 AM-5.1
AAT S
ITY-FMTP – Apply a common flight message transfer protocol (FMTP)
- - CTE-C06 - - SO8/3 AM-1.3 EAI
SAF10.1 – Implement measures to reduce the risk to aircraft operations caused by airspace infringements
- - - - SI.2025 - - AAT S
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
ATC02.8 – Ground based safety nets - - CM-0801
SNET- B0/2 SNET- B0/3 SNET- B0/4
- SO4/1 - AAT S
ATC20 – Enhanced STCA with DAP via Mode S EHS
#69 - CM-0807-A SNET- B1/1
MST.003 0 SO7/2 - AAT
S
ATC22 – Initial Air- Ground Trajectory Information Sharing (Airborne Domain)
#115 6.1.1 IS-0303-A - RMT.068 2 SO4/5 AM-1.2 EAI
ATC23 – Initial Air- Ground Trajectory Information Sharing (Ground Domain)
#115 PJ.18- 06b1
6.1.2 IS-0303-A - RMT.068 2 SO4/5 AM-1.2 EAI
ATC24 – Network Manager Trajectory Information Enhancement
PJ.18- 06b1 6.2.1 POI-0011-IS
POI-0013-IS - RMT.068 2 SO4/5 - EAI
ATC25 – Initial Trajectory #115 6.3.1 IS-0303-A - MST.003
1 AM-1.2 EAI
LSSIP Year 2023 Estonia 85 Working Level Agreed
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
Information Sharing ground distribution
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
NAV12 – ATS IFR Routes for Rotorcraft Operations
#113 - AOM-0810 APTA- B0/6
MST.003 1 SO6/5 - AAT
S
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
- - - - - - - - -
Level 3 Implementation
Objective
SESAR Solution
SDP Famil
y
OI Steps/Enable
rs
ICAO ASBUs EPAS NSP AAS TP KF
AOP14.1 – Remote Tower Services
#12 #13 #52 #71 -
SDM-0201 SDM-0204 SDM-0205
RATS- B1/1
RMT.062 4 SO6/5 - HPA
O
AOP14.2 – Multiple Remote Tower Module
PJ.05-02 - SDM-0207 RATS- B1/1
RMT.062 4 SO6/5 - HPA
O
LSSIP Year 2023 Estonia 86 Working Level Agreed
Annex D: Na�onal stakeholders organisa�on charts
Structure of Estonian Transport Administration
LSSIP Year 2023 Estonia 87 Working Level Agreed
Structure of EANS
LSSIP Year 2023 Estonia 88 Working Level Agreed
Structure of AS Tallinna Lennujaam
LSSIP Year 2023 Estonia 89 Working Level Agreed
Structure of MET
LSSIP Year 2023 Estonia 90 Working Level Agreed
Structure of MIL
LSSIP Year 2023 Estonia 91 Working Level Agreed
Annex E: Glossary of Terms
This Annex mainly shows the abbreviations that are specific to the LSSIP Document for Estonia.
Other general abbreviations are in the Acronyms and Abbreviations document in:
https://www.eurocontrol.int/airial/
Term Description
AF ATM Functionality
EANS Estonian Air Navigation Services (Estonian ANS)
ESTEA Estonian Environment Agency
LOF Log-On Forwarding message
NAMCON The Northern Europe Aviation Meteorology Consortium
NAN Next Authority Notified message
NEFAB North European Functional Airspace Block
NEFRA North European Free Route Airspace
NSA National Supervisory Authority
rAFIS Remote AFIS
rTWR Remote TWR