Dokumendiregister | Transpordiamet |
Viit | 7.1-2/24/15351-1 |
Registreeritud | 05.09.2024 |
Sünkroonitud | 09.09.2024 |
Liik | Sissetulev kiri |
Funktsioon | 7.1 Teetaristuga seotud õiguste andmine |
Sari | 7.1-2 Planeeringud ja lepingukohustuseta ehitiste kooskõlastamise dokumendid |
Toimik | 7.1-2/2024 |
Juurdepääsupiirang | Avalik |
Juurdepääsupiirang | |
Adressaat | Hepta Group Energy OÜ |
Saabumis/saatmisviis | Hepta Group Energy OÜ |
Vastutaja | Arvo Veltri (Users, Teehoiuteenistus, Planeerimise osakond, Tehnovõrkude üksus) |
Originaal | Ava uues aknas |
g1 66.511
g2 66.628
g3 66.559
g4 66.514
g5 66.480
g6 66.513
g7 66.511 g8 66.564
g9 66.590 g1
66.583
g11 66.588
g12 66.629
g13 66.545
g14 66.509
g15 66.494
g16 66.577
g17 66.499
g18 66.531
g19 66.499
g20 66.579 g21
66.585
g22 66.570
g23 67.563
g24 66.502
g25 66.319
g26 66.209
g27 66.368
g28 66.347
g29 66.329
g30 66.399
g31 66.386
HTO_605505 66.496 g32 66.496
g33 66.424
g34 66.425
g35 66.454
g36 66.483
g37 66.668
g38 66.637
g39 66.769
g40 66.828
g41 66.789
g42 67.035
g43 66.770
g44 66.709
g45 66.829
g46 66.841 g47 66.883
g48 66.838
g49 66.818
g50 66.812
g51 66.745
2 52
g53 66.808
g54 66.698
g55 66.560
g56 66.652
g57 66.620
g58 66.491
g59 66.663
g60 66.563
g61 66.558
g62
66.538
g63 66.422
g64 66.685
g65 66.387
g66 66.552
g67 66.515
g68 6 .227
g69 66.613
g70 66.705
g71 66.768
g72 66.739
g73 66.610
g74 66.464
g75 66.575
g76 66.506
g77 66.544
g78 66.254
g79 65.933
g80 66.379
g81 66.373 g82 66.088
g83 65.882
g84 66.133
g85 66.338
g86 66.131
g87 66.410
g88 66.272
g89 66.214
g90 66.328
g91 66.213
g92 66.041
g93 66.296
g94 65.954
g95 65.906
g96 65.739
g97 66.023
g98 66.097
g99 66.100
g100 65.979
g101 65.983
g102 65.877
g103 65.546
g104 65.696
g105 65.785
g106 65.738
g107 65.631
g108 65.889
g109 65.520
g110 65.599
g111 65.924
g112 65.923
g113 65.935
g114 65.822
g115 65.827
g116 65.730
g117 65.487
g118 65.626
g119 65.722
g120 65.644
g121 65.530
g122 65.663
g123 65.437
g124 65.706
g125 65.720
g126 65.624
g127 65.626
g128 65.505
g129 65.296
g130 65.542
g131 65.506
g132 65.597
g133 65.410
g134 65.459
g135 65.414
g136 65.611
g137 65.439
g138 65.314
g139 65.518
g140 65.605
g141 65.635
g142 65.572
g143 65.664
g144 65.580
g145 65.767
g146 65.573
g147 65.492
g148 65.563
g149 65.589
HTO_310512 65.804 g150 65.804
HTO_351590 65.405 g151 65.405
g152 65.366
g153 65.299
g154 65.297
g155 65.227
g156 64.638
g157 64.859 g158 64.555
g159 65.302
g160 65.308
g161 65.274
g162 64.756
g163 65.137
g164 65.223
g165 65.050
g166 64.613
g167 65.066
g168 65.234
g169 65.177 g170
65.093
g171 65.132
g172 65.130
g173 65.263 g174 65.274
g175 65.277
g176 65.141
g177 65.362
g178 65.724
g179 65.785
g180 65.663
g181 65.642
g182 65.221
g183 65.150
g184 64.916
g185 65.247
g186 65.315
g187 65.339
g522 65.700
g523 65.592
g524 65.394
g525 65.257
g526 65.098
g527 64.268
g528 65.171
g529 64.417
g530 64.379
g544 66.304
g545 65.564
g546 66.345
g547 65.564
g548 65.561
g549 65.370
g550 65.435
g551 65.480
g552 65.508
g553 65.507
g554 65.501
g555 65.213
g556 65.149
HTO_108408 65.540
g557 65.540
g558 65.157
g559 65.226
g560 65.270
g561 65.303
g562 65.536
g563 65.555
g564 65.368
g565 65.352
g566 65.421
g567 65.360
g568 65.477
g569 65.551
g570 65.482
g571 65.434
g572 65.599
g573 65.688
g574 65.630 g575 65.656
g576 66.151 g577
66.168
g578 66.188 g579 66.165
g580 65.641
g581 65.738
g582 65.744
g583 65.741
g584 65.655
g585 66.147 g586
66.173
g587 65.632
g588 65.655
g589 66.127
g590 65.972
g591 67.794
HTO_912362 65.939
g592 65.939
g593 65.823
g594 65.725
g595 65.650 g596
66.093
g597 67.859
g598 67.928
g599 67.934
g600 66.107
g601 66.415
g602 66.577 g603
66.528
g604 65.936
g605 65.985
g606 65.938
g607 66.145
g608 65.993
g609 66.034
g610 66.061
g611 66.039
g612 66.306
g613 66.238
g614 67.907
g615 67.910
g616 66.456
g617 67.217
g618 66.470
g619 66.376
g620 66.385
g621 66.335
g622 66.407
g623 66.640
g624 66.698
g625 66.824
g626 66.700
g627 66.758
g628 66.691
g629 66.798
g630 66.797
g631 66.762
g632 67.031
g633 66.619
g634 68.281
g635 67.408
g636 67.522
g637 67.758
g638 68.600
g639 67.398
g640 67.425
g641 67.531
g642 67.431
g643 67.444
g644 67.416 g645 67.423
g646 67.686
g647 67.523
g648 67.816
g649 67.524
g650 67.412
g651 67.640
g652 67.669
g653 67.652
g654 68.973
g655 67.086
g656 67.129
g657 66.535
g658 66.481
g659 66.261
g660 66.275
g661 66.137
g662 65.892
g663 65.546
g664 65.370
g665 65.530
g666 65.203
g667 65.302
g668 64.893
g669 65.123
g670 65.351
g671 65.888 g672 65.883
g685 65.188
g686 63.788
g687 63.993
g688 63.828
g689 63.812
Teostada mastivahetus//Põhjus: gabariit Paigaldada 10m puitmast (8m maapinnast).
Teostada mastivahetus//Põhjus: gabariit Paigaldada 10m puitmast (8m maapinnast).
Teostada mastivahetus//Põhjus: gabariit Paigaldada 10m puitmast (8m maapinnast).
Teostada mastivahetus//Põhjus: gabariit Paigaldada 10m puitmast (8m maapinnast).
Olemasolev ELA SA kaev 085K75>085M35
Vt Ristmevälja joonis nr.1
Teostada mastipüstitus//Põhjus: Sideõhuliini pikendus. Paigaldada 10m puitmast (8m maapinnast).
Kinnitada eraomanikuga masti kasutust ning sideõhuliini jätkamist
TINGMÄRGID, PROJKETEERITUD
Projekteeritud side vahejaotuspunkt (kapp mastil). Mõõdud 700x400x300mm.
Projekteeritud side jaotuspunkt (kapp maapinnal). Mõõdud ca1100x700x430mm, kõrgus maapinnast ca 1,3m.
Projekteeritud lõpp-punkt mastil (ühenduskarp mastil). Mõõdud 150x200mm.
Puhumiskaevik
Projekteeritud puitmast (kõrgus/tüüp väljatoodud viites)
Projekteeritud puitmasti toe komplekt (kõrgus/tüüp väljatoodud viites).
Projekteeritud maasisene multitoru(side) - DB-klassi (Direct Bury) märgistusega, min 1250N.
Projekteeritud perspektiivne kliendiliin(side) - maa sees.
Projekteeritud maasisene multitoru(side) kinnisel meetodil - puurumistoru PE D75, 1250N.
Projekteeritud multitoru(side) ol.oleval elektrivõrgu õhuliinil.
Projekteeritud perspektiivne kliendiliin(side) - õhuliin.
Taastatav haljasala - ca 459 m2.
Taastatav freespuru-, kruusa- või killustikkate - ca 4.5m2.
Suundpuurimise lõpu- ja alguskaevik.
MURUKÜLV
TAGASITÄIDE (Kt=0.98, Kf≥0.5 m/ööp) (märkus 3) LIIV (Kt=0.98, Kf>0.5 m/ööp) LIIV Kf>0.5 m/ööp OLEMASOLEV PINNAS Kt=0.95
15 cmSõelutud mineraalmuld kasvukihina
Haljasala taastamine
10 cm
Hoiatuslint
Projekt. multitoru
0, 7
0, 1
MÄRKUSED
1. Kõik tööd teostada vastavalt kehtivatele normatiividele ja seadustele.
2. Koordinaadid joonistel on L-EST süsteemis, kõrgused EH2000 süsteemis.
3. Projektis kasutatud peamiselt lahtist meetodit, v.a teisiti tähistatud kohtades (jälgida viiteid).
4. Haljasalal paigaldada kaabel 0,7m sügavusele, sõidutee 1m ning kõnnitee alla 1m sügavusele. Kitsaskohtades teostada kaevetööd käsitsi, vajadusel toestada teisi tehnovõrke.
5. Arvestada ol. olevate tehnorajatiste kaablikaitsevöönditega, milles kõikvõimalikud kaeve ja mullatööd ilma kaablivaldaja loata on keelatud. Tööde teostamine liinirajatiste kaitsevööndis võib toimuda kooskõlastatult vastava rajatise valdaja järelevalve üksusega.
6. Olemasolevad katted taastatakse samaväärseks kogu projekti ulatuses.
Hoiatuslint
Projekt. kaabel
PAEKILLUSTIK E>170 MPa fraktsioon 16/32 fraktsioon 32/63 kiilekillustiku fraktsioon 4/16-kulu 25 kg/m2
DREENKIHT LIIVAST (Kt=0.98, Kf>2.0 m/ööp) TAGASITÄIDE (Kt=0.98, Kf≥0.5 m/ööp) (märkus 3) LIIV (Kt=0.98, Kf>0.5 m/ööp) LIIV Kf>0.5 m/ööp OLEMASOLEV PINNAS Kt=0.95
12 cm
10 cm 15 cm
20 cm
10 cm
Tüüp 5 Kruusa taastamine
Ol.olev asfalt
PAEKILLUSTIK
0, 1
E201
E202
E203
Joonise nr
Projekti nr
Kuupäev
Mõõtkava
Projekteerija Hepta Group Energy OÜ Mäealuse 2/1 12618 TALLINN EESTI Tel. +372 5179698 [email protected]
Projekti nimetus
Joonise nimetus
Tellija
Staadium
30.08.2024
Enefit AS // Reg kood 16130213 Lelle tn 22, Kesklinna linnaosa, 11318 Tallinn, Harju maakond Tel +372 55522205 [email protected]
Asendiplaan (VT2103)
E201
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRU MAAKONNAS JA JÄRVA MAAKONNAS (P2024-08)
Kontrollija
Projektijuht
Projekteerija
S. Kulp
S. Kulp
M. Banko
24019 (VT2103)EP 1:1000
g1 66.511
g2 66.628
g3 66.559
g4 66.514
g5 66.480
g6 66.513
g7 66.511 g8 66.564
g9 66.590 g1
66.583
g11 66.588
g12 66.629
g13 66.545
g14 66.509
g15 66.494
g16 66.577
g17 66.499
g18 66.531
g19 66.499
g20 66.579 g21 66.585
g22 66.570
g23 67.563
g24 66.502
g25 66.319
g26 66.209
g27 66.368
g28 66.347
g29 66.329
g30 66.399
g31 66.386
HTO_605505 66.496 g32 66.496
g33 66.424
g34 66.425
g35 66.454
g36 66.483
g37 66.668
g38 66.637
g39 66.769
g40 66.828
g41 66.789
g42 67.035
g43 66.770
g44 66.709
g45 66.829
g46 66.841 g47 66.883
g48 66.838
g49 66.818
g50 66.812
g51 66.745
2 52
g53 66.808
g54 66.698
g55 66.560
g56 66.652
g57 66.620
g58 66.491
g59 66.663
g60 66.563
g61 66.558
g62
66.538
g63 66.422
g64 66.685
g65 66.387
g66 66.552
g67 66.515
g68 6 .227
g69 66.613
g70 66.705
g71 66.768
g72 66.739
g73 66.610
g74 66.464
g75 66.575
g76 66.506
g77 66.544
g78 66.254
g79 65.933
g80 66.379
g81 66.373 g82 66.088
g83 65.882
g84 66.133
g85 66.338
g86 66.131
g87 66.410
g88 66.272
g89 66.214
g90 66.328
g91 66.213
g92 66.041
g93 66.296
g94 65.954
g95 65.906
g96 65.739
g97 66.023
g98 66.097
g99 66.100
g100 65.979
g101 65.983
g102 65.877
g103 65.546
g104 65.696
g105 65.785
g106 65.738
g107 65.631
g108 65.889
g109 65.520
g110 65.599
g111 65.924
g112 65.923
g113 65.935
g114 65.822
g115 65.827
g116 65.730
g117 65.487
g118 65.626
g119 65.722
g120 65.644
g121 65.530
g122 65.663
g123 65.437
g124 65.706
g125 65.720
g126 65.624
g127 65.626
g128 65.505
g129 65.296
g130 65.542
g131 65.506
g132 65.597
g133 65.410
g134 65.459
g135 65.414
g136 65.611
g137 65.439
g138 65.314
g139 65.518
g140 65.605
g141 65.635
g142 65.572
g143 65.664
g144 65.580
g145 65.767
g146 65.573
g147 65.492
g148 65.563
g149 65.589
HTO_310512 65.804 g150 65.804
HTO_351590 65.405 g151 65.405
g152 65.366
g153 65.299
g154 65.297
g155 65.227
g156 64.638
g157 64.859
g158 64.555
g159 65.302
g160 65.308
g161 65.274
g162 64.756
g163 65.137
g164 65.223
g165 65.050
g166 64.613
g167 65.066
g168 65.234
g169 65.177 g170
65.093
g171 65.132
g172 65.130
g173 65.263 g174 65.274
g175 65.277
g176 65.141
g177 65.362
g178 65.724
g179 65.785
g180 65.663
g181 65.642
g182 65.221
g183 65.150
g184 64.916
g185 65.247
g186 65.315
g187 65.339
g188 65.316
g189 65.299
g190 65.288 g191
65.298
g192 65.292
g193 65.134
g194 65.275
g195 65.238
g196 65.274
g197 65.241
g198 65.262 9 . 51
g200 65.263
g201 65.251
g202 65.204
g203 65.160
g204 65.193
g205 65.249
g206 65.314
g207 65.311
g208 65.280
g209 65.307
g210 65.361
g211 65.348
g212 65.362
g213 65.530
g214 65.475
g215 65.324
g216 65.384
g217 65.404
g218 65.410
g219 65.366
HTO_473539 65.599
g220 65.599
g221 65.477
g222 65.286
g223 66.084
HTO_584569 65.321
g224 65.321 g225 65.174
g226 65.362
g227 65.397
g228 65.189
g229 65.085
g230 65.059
g231 65.404
g232 65.343
g233 65.345
g234 65.325
g235 65.231
g236 65.072
g237 64.952
g238 65.276
g239 64.983
g240 65.067
g241 65.082
g242 65.214
g243 65.354
g244 65.383
g245 65.456
g246 65.440
g247 65.287
g248 65.193
g249 65.236
g250 65.086
g251 65.460
g252 65.256
g253 65.295
g254 65.045
g255 65.407
g256 65.437
g257 65.472
g258 65.462
g259 65.443
g260 65.405
g261 64.804
g262 65.177
g263 65.273
g264 65.262
g265 65.279
g266 64.736
g267 65.463
g268 65.472 g269 65.472
g270 65.482
g271 65.453
g272 65.449
g273 64.723
g274 65.487
g275 65.500
g276 65.440
g277 64.800
g278 65.247
g279 65.332
g280 65.516
g281 65.535
g282 65.543
g283 65.523
g284 65.549
g285 64.693
g286 65.262
g287 65.397
g288 65.274
g289 64.709
g290 65.519
g291 65.472
g292 65.517
g293 65.493
g294 65.484
g295 65.476
g296 64.639
g297 64.588
g298 65.407
g299 65.424
g300 65.393
g301 65.175
g302 65.183
g303 64.518
g304 65.363
g305 65.371
g306 65.332
g307 65.250
g308 65.257
g309 65.191
g310 64.204
g311 64.813
g312 64.892
g313 64.598
g314 64.662
g315 64.571
g316 64.010
g317 64.469
g318 63.950
g319 64.054
g320 64.163
g321 65.117
g322 65.165
g323 65.144
g324 65.129
g325 65.142
g326 65.173
g327 64.472
g328 64.507
g329 65.120
g330 65.120
g331 65.115
g332 64.620
g333 64.564
g334 64.553
g335 64.627
g336 65.160 g337 65.107
g338 65.127
g339 65.088
g340 65.031
g341 65.031
g342 65.014
g343 64.742
g344 64.994
g345 65.020
g346 64.609
g347 64.460
g348 64.747
g349 64.681
g350 65.072
g351 65.049
g352 65.104
g353 65.122
g354 65.091
g355 64.732
g356 64.807
g357 65.217
g358 65.175
g359 65.138
g360 65.153
g361 65.192
g362 64.855
g363 64.768
g364 65.139
g365 65.159
g366 65.085
g367 65.077 g368
65.015
g369 64.904
g370 64.821
g371 64.980
g372 65.020
g373 64.930
g374 64.942
g375 65.050
g376 65.041
g377 64.939 g378 64.978
g379 65.036
g380 64.939
g381 64.935
g382 65.063
g383 65.018
g384 64.903
g385 64.909
g386 64.884
g387 64.920
g388 65.014
g389 64.894
g390 64.895
g391 64.722
g392 64.156
g393 64.859
g394 64.892
g395 65.050
g396 64.888
g397 64.835
g398 64.804
g399 64.857
g400 64.727
g401 64.931
g402 64.919
g403 64.938
g404 64.891
g405 64.945 g406
64.943
g407 65.045
g408 65.043
g409 65.143
g410 65.120
g411 65.124
g412 65.113
g413 65.042
g414 64.914
g415 65.089 g416 65.065
g417 65.034 8 . 60
g419 65.073
g420 65.034
g421 64.935
g422 65.049
g423 64.346
g424 64.377
g425 64.360
g426 64.306
g427 64.300
g428 64.323
g429 64.316
g430 64.304
g431 64.779
g432 64.536
g443 64.359
g444 64.533
g445 64.547
g446 64.555
g447 64.692
g448 64.606
g449 64.563
g450 64.537
g451 64.569
g452 64.638
g453 64.784
g454 64.752
g455 64.728
g456 65.325
g457 65.687
g458 65.440
g459 65.452
g460 65.448
g461 65.910
g462 65.834
g463 65.939
g464 65.955
g465 65.500
g466 65.587
g467 65.666
g468 65.645
g469 65.642
g522 65.700
g523 65.592
g524 65.394
g525 65.257
g526 65.098
g527 64.268
g528 65.171
g529 64.417
g530 64.379
g531 65.007
g532 65.004
g533 64.978
g534 64.352
g535 64.377
g536 65.083
g537 64.138
g538 64.298
g539 65.686
g540 64.747
g541 65.217
g542 65.350
g543 65.228
g544 66.304
g545 65.564
g572 65.599
g573 65.688
g574 65.630 g575 65.656
g576 66.151 g577
66.168
g578 66.188 g579 66.165
g580 65.641
g581 65.738
g582 65.744
g583 65.741
g584 65.655
g585 66.147 g586
66.173
g587 65.632
g588 65.655
g589 66.127
g590 65.972
g591 67.794
HTO_912362 65.939
g592 65.939
g593 65.823
g594 65.725
g595 65.650 g596 66.093
g597 67.859
g598 67.928
g599 67.934
g600 66.107
g601 66.415
g602 66.577 g603
66.528
g604 65.936
g605 65.985
g606 65.938
g607 66.145
g608 65.993
g609 66.034
g610 66.061
g612 66.306
g613 66.238
g614 67.907
g615 67.910
g616 66.456
g617 67.217
g618 66.470
g629 66.798
g630 66.797
g631 66.762
g660 66.275
g663 65.546
g664 65.370
g665 65.530
g666 65.203
g667 65.302
g669 65.123
g670 65.351
g671 65.888 g672 65.883
g683 65.046
g684 65.167
g685 65.188
g686 63.788
g687 63.993
g688 63.828
g689 63.812
g690 63.767
g691 63.846 g692 63.841
g693 64.379
Teostada mastivahetus//Põhjus: gabariit Paigaldada 12m puitmast (10m maapinnast) koos toega.
Teostada mastivahetus//Põhjus: gabariit Paigaldada 12m puitmast (10m maapinnast) koos toega.
Vt Ristmevälja joonis nr.1
Teostada mastipüstitus//Põhjus: Sideõhuliini pikendus. Paigaldada 10m puitmast (8m maapinnast).
Kinnitada eraomanikuga masti kasutust ning sideõhuliini jätkamist
TINGMÄRGID, PROJKETEERITUD
Projekteeritud side vahejaotuspunkt (kapp mastil). Mõõdud 700x400x300mm.
Projekteeritud side jaotuspunkt (kapp maapinnal). Mõõdud ca1100x700x430mm, kõrgus maapinnast ca 1,3m.
Projekteeritud lõpp-punkt mastil (ühenduskarp mastil). Mõõdud 150x200mm.
Puhumiskaevik
Projekteeritud puitmast (kõrgus/tüüp väljatoodud viites)
Projekteeritud puitmasti toe komplekt (kõrgus/tüüp väljatoodud viites).
Projekteeritud maasisene multitoru(side) - DB-klassi (Direct Bury) märgistusega, min 1250N.
Projekteeritud perspektiivne kliendiliin(side) - maa sees.
Projekteeritud maasisene multitoru(side) kinnisel meetodil - puurumistoru PE D75, 1250N.
Projekteeritud multitoru(side) ol.oleval elektrivõrgu õhuliinil.
Projekteeritud perspektiivne kliendiliin(side) - õhuliin.
Taastatav haljasala - ca 459 m2.
Taastatav freespuru-, kruusa- või killustikkate - ca 4.5m2.
Suundpuurimise lõpu- ja alguskaevik.
MURUKÜLV
TAGASITÄIDE (Kt=0.98, Kf≥0.5 m/ööp) (märkus 3) LIIV (Kt=0.98, Kf>0.5 m/ööp) LIIV Kf>0.5 m/ööp OLEMASOLEV PINNAS Kt=0.95
15 cmSõelutud mineraalmuld kasvukihina
Haljasala taastamine
10 cm
Hoiatuslint
Projekt. multitoru
0, 7
0, 1
MÄRKUSED
1. Kõik tööd teostada vastavalt kehtivatele normatiividele ja seadustele.
2. Koordinaadid joonistel on L-EST süsteemis, kõrgused EH2000 süsteemis.
3. Projektis kasutatud peamiselt lahtist meetodit, v.a teisiti tähistatud kohtades (jälgida viiteid).
4. Haljasalal paigaldada kaabel 0,7m sügavusele, sõidutee 1m ning kõnnitee alla 1m sügavusele. Kitsaskohtades teostada kaevetööd käsitsi, vajadusel toestada teisi tehnovõrke.
5. Arvestada ol. olevate tehnorajatiste kaablikaitsevöönditega, milles kõikvõimalikud kaeve ja mullatööd ilma kaablivaldaja loata on keelatud. Tööde teostamine liinirajatiste kaitsevööndis võib toimuda kooskõlastatult vastava rajatise valdaja järelevalve üksusega.
6. Olemasolevad katted taastatakse samaväärseks kogu projekti ulatuses.
Hoiatuslint
Projekt. kaabel
PAEKILLUSTIK E>170 MPa fraktsioon 16/32 fraktsioon 32/63 kiilekillustiku fraktsioon 4/16-kulu 25 kg/m2
DREENKIHT LIIVAST (Kt=0.98, Kf>2.0 m/ööp) TAGASITÄIDE (Kt=0.98, Kf≥0.5 m/ööp) (märkus 3) LIIV (Kt=0.98, Kf>0.5 m/ööp) LIIV Kf>0.5 m/ööp OLEMASOLEV PINNAS Kt=0.95
12 cm
10 cm 15 cm
20 cm
10 cm
Tüüp 5 Kruusa taastamine
Ol.olev asfalt
PAEKILLUSTIK
0, 1
E201
E202
E203
Joonise nr
Projekti nr
Kuupäev
Mõõtkava
Projekteerija Hepta Group Energy OÜ Mäealuse 2/1 12618 TALLINN EESTI Tel. +372 5179698 [email protected]
Projekti nimetus
Joonise nimetus
Tellija
Staadium
30.08.2024
Enefit AS // Reg kood 16130213 Lelle tn 22, Kesklinna linnaosa, 11318 Tallinn, Harju maakond Tel +372 55522205 [email protected]
Asendiplaan (VT2103)
E202
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRU MAAKONNAS JA JÄRVA MAAKONNAS (P2024-08)
Kontrollija
Projektijuht
Projekteerija
S. Kulp
S. Kulp
M. Banko
24019 (VT2103)EP 1:1000
g225 65.174
g226 65.362
g227 65.397
g228 65.189
g229 65.085
g230 65.059
g231 65.404
g232 65.343
g233 65.345
g234 65.325
g235 65.231
g236 65.072
g237 64.952
g238 65.276
g239 64.983
g240 65.067
g241 65.082
g242 65.214
g243 65.354
g244 65.383
g245 65.456
g246 65.440
g247 65.287
g248 65.193
g249 65.236
g250 65.086
g251 65.460
g252 65.256
g253 65.295
g254 65.045
g255 65.407
g256 65.437
g257 65.472
g258 65.462
g259 65.443
g260 65.405
g261 64.804
g262 65.177
g263 65.273
g264 65.262
g265 65.279
g266 64.736
g267 65.463
g268 65.472
g269 65.472
g270 65.482
g271 65.453
g272 65.449
g273 64.723
g274 65.487
g275 65.500
g276 65.440
g277 64.800
g278 65.247
g279 65.332
g280 65.516
g281 65.535
g282 65.543
g283 65.523
g284 65.549
g285 64.693
g286 65.262
g287 65.397
g288 65.274
g289 64.709
g290 65.519
g291 65.472
g292 65.517
g293 65.493
g294 65.484
g295 65.476
g296 64.639
g297 64.588
g298 65.407
g299 65.424
g300 65.393
g301 65.175
g302 65.183
g303 64.518
g304 65.363
g305 65.371
g306 65.332
g307 65.250
g308 65.257
g309 65.191
g310 64.204
g311 64.813
g312 64.892
g313 64.598
g314 64.662
g315 64.571
g316 64.010
g317 64.469
g318 63.950
g319 64.054
g320 64.163
g321 65.117
g322 65.165
g323 65.144
g324 65.129
g325 65.142
g326 65.173
g327 64.472
g328 64.507
g329 65.120
g330 65.120
g331 65.115
g332 64.620
g333 64.564
g334 64.553
g335 64.627
g336 65.160 g337
65.107
g338 65.127
g339 65.088
g340 65.031
g341 65.031
g342 65.014
g343 64.742
g344 64.994
g345 65.020
g346 64.609
g347 64.460
g348 64.747
g349 64.681
g350 65.072
g351 65.049 g352 65.104
g353 65.122
g354 65.091
g355 64.732
g356 64.807
g357 65.217
g358 65.175
g359 65.138
g360 65.153
g361 65.192
g362 64.855
g363 64.768
g364 65.139
g365 65.159
g366 65.085
g367 65.077 g368 65.015
g369 64.904
g370 64.821
g371 64.980
g372 65.020
g373 64.930
g374 64.942
g375 65.050
g376 65.041
g377 64.939 g378 64.978
g379 65.036
g380 64.939
g381 64.935
g382 65.063
g383 65.018
g384 64.903
g385 64.909
g386 64.884
g387 64.920
g388 65.014
g389 64.894
g390 64.895
g391 64.722
g392 64.156
g393 64.859
g394 64.892
g395 65.050
g396 64.888
g397 64.835
g398 64.804
g399 64.857
g400 64.727
g401 64.931
g402 64.919
g403 64.938
g404 64.891
g405 64.945 g406
64.943
g407 65.045 g408
65.043
g409 65.143
g410 65.120
g411 65.124
g412 65.113
g413 65.042
g414 64.914
g415 65.089
g416 65.065
g417 65.034 8 . 60
g419 65.073
g420 65.034
g421 64.935
g422 65.049
g423 64.346
g424 64.377
g425 64.360
g426 64.306
g427 64.300
g428 64.323
g429 64.316
g430 64.304
g431 64.779
g432 64.536
g433 65.110
g434 65.874
g435 65.006
g436 65.119
g437 65.137
g438 64.680
g439 64.717
g440 64.794
g441 64.921
g442 64.759
g443 64.359
g444 64.533
g445 64.547
g446 64.555
g447 64.692
g448 64.606
g449 64.563
g450 64.537 g451 64.569
g452 64.638
g453 64.784
g454 64.752
g455 64.728
g456 65.325
g457 65.687
g458 65.440
g459 65.452
g460 65.448
g461 65.910
g462 65.834
g463 65.939
g464 65.955
g465 65.500
g466 65.587
g467 65.666
g468 65.645
g469 65.642
g470 65.238
g471 65.201
g472 65.283
g473 65.222
g474 65.333
g475 65.314
g476 65.309
g477 65.370
g478 65.406
g479 65.156
g480 64.817
g481 64.884
g482 65.333
g483 64.984
g484 65.545
g485 65.576
g486 65.610
g487 66.094
g488 65.926
g489 65.953
g490 65.811
g491 65.808
g492 65.914
g493 65.923
g494 65.866
g495 65.873
g496 66.017
g497 66.178
g498 66.204
g499 66.186
g500 66.260
g501 66.167
g502 66.108 g503 66.111
g504 66.063
g505 66.102
g506 65.961
g507 66.051
g508 65.937
g509 66.493
g510 65.871
g511 66.137
g512 66.630
g513 66.798
g514 67.360
g515 67.341
g516 67.607
g517 68.565
g518 68.190
g519 70.258
g520 69.270
g521 69.208
g673 64.913
g674 66.614
g675 64.620
g676 64.935
g677 65.256
g678 65.642
g679 65.398
g680 65.638
g681 65.789
g682 65.039
g683 65.046
g684 65.167
Teostada mastivahetus//Põhjus: gabariit Paigaldada 12m puitmast (10m maapinnast) koos toega.
Teostada mastivahetus//Põhjus: gabariit Paigaldada 12m puitmast (10m maapinnast) koos toega.
Vt Ristmevälja joonis nr.2
TINGMÄRGID, PROJKETEERITUD
Projekteeritud side vahejaotuspunkt (kapp mastil). Mõõdud 700x400x300mm.
Projekteeritud side jaotuspunkt (kapp maapinnal). Mõõdud ca1100x700x430mm, kõrgus maapinnast ca 1,3m.
Projekteeritud lõpp-punkt mastil (ühenduskarp mastil). Mõõdud 150x200mm.
Puhumiskaevik
Projekteeritud puitmast (kõrgus/tüüp väljatoodud viites)
Projekteeritud puitmasti toe komplekt (kõrgus/tüüp väljatoodud viites).
Projekteeritud maasisene multitoru(side) - DB-klassi (Direct Bury) märgistusega, min 1250N.
Projekteeritud perspektiivne kliendiliin(side) - maa sees.
Projekteeritud maasisene multitoru(side) kinnisel meetodil - puurumistoru PE D75, 1250N.
Projekteeritud multitoru(side) ol.oleval elektrivõrgu õhuliinil.
Projekteeritud perspektiivne kliendiliin(side) - õhuliin.
Taastatav haljasala - ca 459 m2.
Taastatav freespuru-, kruusa- või killustikkate - ca 4.5m2.
Suundpuurimise lõpu- ja alguskaevik.
MURUKÜLV
TAGASITÄIDE (Kt=0.98, Kf≥0.5 m/ööp) (märkus 3) LIIV (Kt=0.98, Kf>0.5 m/ööp) LIIV Kf>0.5 m/ööp OLEMASOLEV PINNAS Kt=0.95
15 cmSõelutud mineraalmuld kasvukihina
Haljasala taastamine
10 cm
Hoiatuslint
Projekt. multitoru
0, 7
0, 1
MÄRKUSED
1. Kõik tööd teostada vastavalt kehtivatele normatiividele ja seadustele.
2. Koordinaadid joonistel on L-EST süsteemis, kõrgused EH2000 süsteemis.
3. Projektis kasutatud peamiselt lahtist meetodit, v.a teisiti tähistatud kohtades (jälgida viiteid).
4. Haljasalal paigaldada kaabel 0,7m sügavusele, sõidutee 1m ning kõnnitee alla 1m sügavusele. Kitsaskohtades teostada kaevetööd käsitsi, vajadusel toestada teisi tehnovõrke.
5. Arvestada ol. olevate tehnorajatiste kaablikaitsevöönditega, milles kõikvõimalikud kaeve ja mullatööd ilma kaablivaldaja loata on keelatud. Tööde teostamine liinirajatiste kaitsevööndis võib toimuda kooskõlastatult vastava rajatise valdaja järelevalve üksusega.
6. Olemasolevad katted taastatakse samaväärseks kogu projekti ulatuses.
Hoiatuslint
Projekt. kaabel
PAEKILLUSTIK E>170 MPa fraktsioon 16/32 fraktsioon 32/63 kiilekillustiku fraktsioon 4/16-kulu 25 kg/m2
DREENKIHT LIIVAST (Kt=0.98, Kf>2.0 m/ööp) TAGASITÄIDE (Kt=0.98, Kf≥0.5 m/ööp) (märkus 3) LIIV (Kt=0.98, Kf>0.5 m/ööp) LIIV Kf>0.5 m/ööp OLEMASOLEV PINNAS Kt=0.95
12 cm
10 cm 15 cm
20 cm
10 cm
Tüüp 5 Kruusa taastamine
Ol.olev asfalt
PAEKILLUSTIK
0, 1
E201
E202
E203
Joonise nr
Projekti nr
Kuupäev
Mõõtkava
Projekteerija Hepta Group Energy OÜ Mäealuse 2/1 12618 TALLINN EESTI Tel. +372 5179698 [email protected]
Projekti nimetus
Joonise nimetus
Tellija
Staadium
30.08.2024
Enefit AS // Reg kood 16130213 Lelle tn 22, Kesklinna linnaosa, 11318 Tallinn, Harju maakond Tel +372 55522205 [email protected]
Asendiplaan (VT2103)
E203
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRU MAAKONNAS JA JÄRVA MAAKONNAS (P2024-08)
Kontrollija
Projektijuht
Projekteerija
S. Kulp
S. Kulp
M. Banko
24019 (VT2103)EP 1:1000
0 1 2
4 5 6 7 8 9
3
10 11
Ristmevälja joonis Nr. 1
Joonise nr
Projekti nr
Kuupäev
Mõõtkava
Projekteerija Hepta Group Energy OÜ Mäealuse 2/1 12618 TALLINN EESTI Tel. +372 5179698 [email protected]
Projekti nimetus
Joonise nimetus
Tellija
Staadium
19.08.2024
Enefit AS // Reg kood 16130213 Lelle tn 22, Kesklinna linnaosa, 11318 Tallinn, Harju maakond Tel +372 55522205 [email protected]
Ristmevälja joonis nr.1
E101
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRU MAAKONNAS JA JÄRVA MAAKONNAS (P2024-09)
Kontrollija
Projektijuht
Projekteerija
S. Kulp
S. Kulp
M. Banko
24019 (VT2103)EP 1:150
D
C
B
A
1 2 3 4 5 6 7 8
F
E
D
C
B
A
1 2 3 4 5 6 7 8
F
E
0 1 2
4 5 6 7 8 9
3
10 11
Ristmevälja joonis Nr. 2
Joonise nr
Projekti nr
Kuupäev
Mõõtkava
Projekteerija Hepta Group Energy OÜ Mäealuse 2/1 12618 TALLINN EESTI Tel. +372 5179698 [email protected]
Projekti nimetus
Joonise nimetus
Tellija
Staadium
19.08.2024
Enefit AS // Reg kood 16130213 Lelle tn 22, Kesklinna linnaosa, 11318 Tallinn, Harju maakond Tel +372 55522205 [email protected]
Ristmevälja joonis nr.2
E101
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRU MAAKONNAS JA JÄRVA MAAKONNAS (P2024-09)
Kontrollija
Projektijuht
Projekteerija
S. Kulp
S. Kulp
M. Banko
24019 (VT2103)EP 1:150
D
C
B
A
1 2 3 4 5 6 7 8
F
E
D
C
B
A
1 2 3 4 5 6 7 8
F
E
Tellija:
Enefit AS
Lelle tn 22, Kesklinna linnaosa, 11318 Tallinn, Harju maakond
Dokumendi tüüp:
Eelprojekt
Kuupäev:
21.08.2024
Projekti nr:
24019
Objekti aadress:
Röa küla, Türi vald, Järva maakond
SIDEVÕRGU
PROJEKTEERIMINE IDA-
VIRUMAAKONNAS JA JÄRVA
MAAKONNAS (P2024-08)
VT2103
EELPROJEKT
www.hepta.ee
Hepta Group Energy OÜ
Teaduspargi 6/1
12618 Tallinn
T +372 53 42 6358
MTR TEL002175
12502103
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRUMAAKONNAS JA JÄRVA MAAKONNAS (P2024-08)
VT2103
Side välisvõrk
Projekti nr. 24019 Projekti koostaja: Hepta Group Energy OÜ
Staadium: Eelprojekt Vastutav spetsialist: Sander Kulp
Versioon: v01 Projekteerija: Marek Banko
Dokument: 2401_EP_ENV-4-01_Seletuskiri-VT2103 Kuupäev: 21.08.2024
2 / 11
Versioon 01
Projekteerija: Marek Banko
Projektijuht: Sander Kulp Diplomeeritud elektriinsener - tase 7 (Kutsetunnistus 187042)
SISUKORD SIDEVÕRKUDE LAHENDUSED ............................................................................ 3
1.1. Standardid .......................................................................................................... 3 1.2. Üldosa ................................................................................................................ 3 1.3. Trassivalik ........................................................................................................... 4 1.4. Maasisese multitoru paigaldus ............................................................................... 4 1.5. Sideõhuliini paigaldus ........................................................................................... 4 1.6. Sideliitumine ....................................................................................................... 5 1.7. Nõuded olemasolevate kommunikatsioonide kaitsmiseks kaevetöödel ......................... 5 1.8. Täiendav info ....................................................................................................... 6 1.9. Multitorustik ........................................................................................................ 7 1.10. AS Gaasivõrk ....................................................................................................... 8
TAIMEDE KAITSE ............................................................................................... 8
2.1. Soovituslikud hooldusvõtted .................................................................................. 8 2.2. Puude kaitsmine .................................................................................................. 9 2.3. Puujuurte kaitsmine ............................................................................................. 9
EHITAMINE KAITSEALADES .............................................................................. 9
3.1. Keskkonnakaitse .................................................................................................. 9 3.2. Muinsuskaitse .......................................................... Error! Bookmark not defined.
PUUTUMUSED RIIGITEEGA .............................................................................. 10
4.1. Ristumine riigimaanteega õhuliiniga ........................... Error! Bookmark not defined. 4.2. Ristumine riigimaanteega maa-liiniga ................................................................... 10 4.3. Kulgemine riigimaanteel maa-liiniga ..................................................................... 10 4.4. Kaablipaigaldus nõuded riigiteede katastris ........................................................... 10
JOONISED ....................................................................................................... 10
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRUMAAKONNAS JA JÄRVA MAAKONNAS (P2024-08)
VT2103
Side välisvõrk
Projekti nr. 24019 Projekti koostaja: Hepta Group Energy OÜ
Staadium: Eelprojekt Vastutav spetsialist: Sander Kulp
Versioon: v01 Projekteerija: Marek Banko
Dokument: 2401_EP_ENV-4-01_Seletuskiri-VT2103 Kuupäev: 21.08.2024
3 / 11
SIDEVÕRKUDE LAHENDUSED
1.1. Standardid
Käesoleva projekti koostamisel on lähtutud järgnevatest nõutest ja standarditest:
• EVS 932:2017 Ehitusprojekt.
• ELA SA elektroonilise side alased tehnilised tingimused nr: TLVT24007
• EVS 843:2016 Linnatänavad
• EVS-EN 50341:1:2013 Elektriõhuliinid vahelduvpingega üle 1 kV. Osa 1: Üldnõuded.
Ühised eeskirjad
• EVS-EN 50341:2:2018 Elektriõhuliinid vahelduvpingega üle 1 kV. Osa 2-20: Eesti
siseriiklikud erinõuded
• EVS-EN 61936-1:2010/A1:2014 Tugevvoolupaigaldised nimivahelduvpingega üle 1 kV.
Osa 1: Üldnõuded
1.2. Üldosa
Käesolevas projektis on lahendatud sidevõrgu projekt Järva maakonnas projekti viitega VT2102
piirkond.
Eelprojekti põhilisteks eesmärkideks on:
• Projekteerida ehitatavale passiivsele elektroonilisele side juurdepääsivõrgule
multitorustiku trass, sidekaevud, vahejaotus- ja lõpp-punktide asukohad koos
kliendiliinidega;
• Ühendada kõik lähteandmetes toodud aadressid operaatorineutraalse sidevõrguga, mis
omakorda ühendatakse baasvõrguga;
• Kontrollida nõuetekohaseid gabariite projekteeritavale multitorustikule;
• Kontrollida olemasolevate mastide seisukorda, kuhu sideliin rajatakse.
Projekteerimistöö aluseks on Enefit AS poolt väljastatud projekteerimisülesanne (Lähteülesanne
VT2102) ja MTÜ Eesti Andmesidevõrk tehnilised tingimused.
Nimetatud dokumentidega tuleb arvestada ka tööprojekti koostamisel ja ehitustööde teostamisel.
Käesolev projekt ei sisalda ehitustööde organiseerimise osa. Ehitustööde teostaja lahendab tööde
teostamise tehnoloogilise järjekorra koos sellega kaasnevate töödega, sh ehitusaegsete ajutiste
tehnovõrkude rajamisega või ümberehitustega. Lahendused ümberehitustele kuuluvad ehituse
töövõttu.
Ehitajal on kohustus enne hinnapakkumise tegemist tutvuda olukorraga kohapeal. Enne tööde
algust tutvuda kooskõlastus tingimustega ning arvestada nende nõudmistega. Vähemalt kolm
päeva enne liiniehitustööde algust tuleb võtta ühendust kinnistute valdajatega ning teavitada neid
tööde teostamisest nende maaüksusel. Tööde alustamisel tuleb informeerida tehnovõrkude
valdajaid ja täpsustada tehnovõrkude täpne asukoht.
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRUMAAKONNAS JA JÄRVA MAAKONNAS (P2024-08)
VT2103
Side välisvõrk
Projekti nr. 24019 Projekti koostaja: Hepta Group Energy OÜ
Staadium: Eelprojekt Vastutav spetsialist: Sander Kulp
Versioon: v01 Projekteerija: Marek Banko
Dokument: 2401_EP_ENV-4-01_Seletuskiri-VT2103 Kuupäev: 21.08.2024
4 / 11
Projekti koostamisel on kasutatud järgmisi materjale:
• Geodeetilise täpsusega määratud olemasolevate mastide asukohad ning geodeetiline
alusplaan, valitud kohtades;
• Maa-ameti avaandmetena kätte saadavad katastriüksuste, teede ning hoonete piiri
andmed;
• Enefit AS geoinfromatiivse veebikeskkonna „Trimble“ väljavõtted;
• MTÜ Eesti Andmesidevõrk poolt väljastatud tehnilised tingimused.
1.3. Trassivalik
Multitoru trassi projekteerimisel on võimalikult suurel määral kasutatud olemasolevaid Elektrilevi
OÜ ja vallale kuuluvaid maste. Sellisel juhul on võimalik uus sidevõrk paigaldada olemasolevate
tehnovõrkudega samasse kaitsevööndisse. Kohtades, kus selline võimalus puudub on uus sidetrass
projekteeritud maakaabelliinina või õhuliinina. Baasvõrgu ühenduskoht on ette määratud
lähteülesandes.
1.4. Maasisese multitoru paigaldus
Maasisene multitoru paigaldada pinnasesse vähemalt 0,7 m sügavusele liivapadjas kaitsetorusse.
Teemaal paigaldatakse multitoru minimaalselt 1 m sügavusele ning ristumisel teetruupidega
minimaalselt 1,0m vertikaalvahega truubi alt. Ristumisel kommunikatsioonidega paigaldada
projekteeritavad tehnorajatised plasttorus ja juhinduda normide kohastest püst- ja
horisontaalvahekaugustest ning kooskõlastustes toodud tingimustest. Multitoru montaažil jälgida
multitoru tootja poolt lubatud painderaadiusi ja tõmbejõudusid. Ristuvale allmaarajatisele lähemal
kui 1 m kaevata äärmise ettevaatlikkusega ning vajadusel käsitsi (vt. kooskõlastuste tingimusi).
Mehhaniseeritud kaevamine on lubatav ainult maa-aluste rajatiste valdajate loal, seejuures enne
kontrollides, kas maa sees ei leidu plaanidele kandmata rajatisi. Ristumistel allmaarajatistega tuleb
multitoru paigaldussügavus täpsustada kohapeal ehituse käigus, tehes käsitsi kaevates kindlaks
nende täpse asukoha ja suuna. Pärast kaevetööde ja multitoru paigaldustööde lõppu tuleb kaevis
täita tihendatud pinnasega (pinnase tihendamise koefitsient sõidu- ja kõnniteedel on 0,98). Samuti
taastada teekatted ja haljastus endisele või maapinna taastamise joonisel ettenähtud kujule.
1.5. Sideõhuliini paigaldus
Sideõhuliin paigaldada olemasolevatele mastidele olemasolevast elektriliinist alla poole. Isoleeritud
elektrikaabli korral paigaldada sideliin paralleelselt elektrikaabliga teisele poole masti. Seda juhul,
kui olukord seda võimaldab ja nõutud gabariit elektriliiniga välja annab. Madalpingeõhu-kaabli ja
sideliinide kinnituskohtade vahe mastil peab olema vähemalt 0,3m. Vähim vertikaalvahemik
madalpinge õhukaabli ristumisel sideliiniga peab visangus olema 0,3m. Keskpinge õhukaabli puhul
on see 0,5m ning isoleerimata faasijuhtmest 1,5m.
Sideõhuliini paigaldusel tuleb arvestada standardis EVS-EN 50341-2-20:2018 esitatud
õhkvahemikega sideliini ja maa vahel.
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRUMAAKONNAS JA JÄRVA MAAKONNAS (P2024-08)
VT2103
Side välisvõrk
Projekti nr. 24019 Projekti koostaja: Hepta Group Energy OÜ
Staadium: Eelprojekt Vastutav spetsialist: Sander Kulp
Versioon: v01 Projekteerija: Marek Banko
Dokument: 2401_EP_ENV-4-01_Seletuskiri-VT2103 Kuupäev: 21.08.2024
5 / 11
Tabel. 2 Nõutud gabariidid sideõhuliini ja maa vahel
Maani Sõiduteeni Kergliiklusteeni Suuregabariidiliste töömasinate töötamisaladel
4,0m 7,0m* 4,5m 5,0m
*Teeomaniku kooskõlastamisel võib vahekaugust vähendada 1,5m võrra
1.6. Sideliitumine
Tehtavad tööd: Passiivse elektroonilise side juurdepääsuvõrgu rajamine olemasolevast ELA SA
kaevust 085K75>085M35
1.7. Nõuded olemasolevate kommunikatsioonide kaitsmiseks kaevetöödel
Projekti koostamisel on eeldatud, et geodeetiliste tööde aruandes esitatud informatsioon
olemasolevate insenertehniliste kommunikatsioonide asukoha kohta on tõene.
Kõik ehitustööd tuleb läbi viia vastavuses Eesti Vabariigis kehtivate seaduste ja nõuetega,
projektlahendusest tulenevate teiste normide ja standarditega ning üldkehtivatele põhimõtetele ja
arusaamadele kvaliteetsest tööst.
Töövõtja peab enne tööde algust veenduma, et ta ei kahjustaks ühtegi olemasolevat rajatist ja
kommunikatsiooni. Enne töödega alustamist tuleb Töövõtjal koostöös olemasolevate maa-aluste
rajatiste valdajatega rajatiste asukohad ja sügavused täpsustada ja tähistada, et vältida
ehitustööde käigus tekkida võivat kahju.
Rajatiste, kommunikatsioonide rikkumise korral peab Töövõtja heastama ja taastama olemasoleva
olukorra ja katma kõik sellega seotud kulutused ja ametkondade nõuded.
Töövõtja ei tohi demonteerida olemasolevaid süsteeme, rajatisi ja seadmeid enne kui on
korraldatud ajutised ühendused või uued süsteemid on võimalik töösse rakendada, et tagada
vajalikud teenused tarbijatele, vesi, kanalisatsioon, sadevesi, elekter, telefon, teed, tänavad jms.
Töövõtjal tuleb rajatiste ja kommunikatsioonide vahetus läheduses töötamisel täita valdajate poolt
esitatavaid nõudeid. Tööd elektri-ja siderajatiste kaitsevööndis tuleb teostada kooskõlastatult
omanikega ja siderajatiste korral.
Olemasolevate kaablite, õhuliinide, jm vahetus läheduses tuleb kaevetöid teha nende ehitiste
omaniku juhendite kohaselt. Siderajatiste kaitsetsoonis võib töid teostada volitatud esindaja
kirjaliku tööloa alusel.
Kaevetööde teostamisel olemasolevate elektri-ja sideliinirajatiste vahetus läheduses tuleb rajatised
toestada ja kaitsta nii, et need ei liiguks ehitustööde jooksul või neid ei vigastataks.. Kaablite
vahetus läheduses kaevata käsitsi.
Valgustusposti paiknemisel tehnovõrkude vahetus läheduses, tuleb tehnovõrgud käsitsi lahti
kaevata ja tõsta valgustusposti jalandi kõrvale, vigastamata kaablit.
Töövõtja peab kindlustama kaeviku seinad, vältimaks kaeviku seinte varisemist koos vahetus
läheduses oleva sidekaabliga. Kaeviku toestus peab ära hoidma külgnevate pinnaste,
vundamentide, sidekaabli, rajatiste ja muu omandi häirimise või kokkuvarisemise.
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRUMAAKONNAS JA JÄRVA MAAKONNAS (P2024-08)
VT2103
Side välisvõrk
Projekti nr. 24019 Projekti koostaja: Hepta Group Energy OÜ
Staadium: Eelprojekt Vastutav spetsialist: Sander Kulp
Versioon: v01 Projekteerija: Marek Banko
Dokument: 2401_EP_ENV-4-01_Seletuskiri-VT2103 Kuupäev: 21.08.2024
6 / 11
Vajaduse korral tuleb olemasolev sidekaabel (nii paralleelselt kulgev kui ka ristuv kaabel) kaitsta
ja üles riputada. Eriti kitsastes tingimustes on soovitav kaevetööd läbi viia lõikude kaupa.
Töövõtja peab pinnase tihendamise kaevikute tagasitäitmisel läbi viima selliselt, et ei kahjustataks
torustikku ja võimalikke kaableid ning saavutatakse nõutava pinnase taastamine.
Tagasitäite tegemisel tuleb jälgida, et materjal ei sisaldaks näiteks suuri kive, mis võivad oma
kukkumisega mõjutada nii torustikku kui näiteks erinevaid kaableid (elekter, side).
Lahtikaevatud kaablitel (nii side kui ka elekter) ja torustikel (vesi jm) tuleb alus hoolikalt tihendada,
et kaablid ei jääks pingesse ning tagasitäide tuleb teha hoolikalt, s.t. tagasitäite materjal ei tohi
kaableid rikkuda. Suurimate pinnaseosiste läbimõõt ei tohi ületada 2/3 tihendatava kihi paksusest.
Torustike rajamisel kinnisel meetodil (puurimistööd, rammimine) tuleb määrata enne tööde algust
olemasolevate, ristuvate kaablite sügavus (määrata surfimise teel omaniku juuresolekul).
Olemasolevate õhuliinide all töötamisel on keelatud kasutada kõrgeid mehhanisme. Töövõtja peab
valima töödeks sobivad mehhanismid, mis tagavad min vahekauguse 5 m.
Töövõtja peab kõik kaeviku vahetus läheduses olevad õhuliini postid toestama ning tagama, et
post ei liiguks, kuna liinid on jäigad. Vajaduse korral tuleb ehitustööde ajaks olemasolevate postide
toed ja tõmmitsad teisaldada, seda aga pärast posti toestamist.
Pärast tööde lõpetamist tuleb taastada ehituseelne olukord, kontrollida, et postid oleks
vertikaalsed, et õhuliinid oleks ühtlaselt pingutatud. Tõmmitsate tagasipanek peab olema tehtud
vastavat litsentsi omava firma poolt.
Rajatavate torustike ristumisel olemasolevate soojatorustikega tuleb täita Tellija nõuded.
Kõik ehitustööde käigus rajatavate torustikega ristuvad olemasolevad kommunikatsioonid tuleb
vigastamise korral taastada ja kanda teostusjoonistele.
1.8. Täiendav info
Käes oleva projekti raames on ette näidatud jaotuskappide, vahejaotuskappide, lõpp punktide,
uute mastide ning mastitugede asukohad. Kappide asukohad on projekteeritud võimalikult
ligipääsetavatesse kohtadesse sidevõrgu kõrvale. Vahejaotuskapid paigaldatakse mastidele ning
jaotuskapid paigaldatakse maasse. Täpne lahendus määratakse tööprojekti raames.
Vahejaotuskappide ja jaotuskappide asukohtade määramisel on arvestatud klientide arvuga
piirkonnas ning jaotuskapid jaotatud trassile nii, et oleks võimalik tekitada sideühendus ka
perspektiivsete klientidega.
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRUMAAKONNAS JA JÄRVA MAAKONNAS (P2024-08)
VT2103
Side välisvõrk
Projekti nr. 24019 Projekti koostaja: Hepta Group Energy OÜ
Staadium: Eelprojekt Vastutav spetsialist: Sander Kulp
Versioon: v01 Projekteerija: Marek Banko
Dokument: 2401_EP_ENV-4-01_Seletuskiri-VT2103 Kuupäev: 21.08.2024
7 / 11
Pilt 1. Vahejaotuskapp (vasak) ja peajaotuskapp (parem)
Peajaotuskapp on joonistel tähistatud Cxxxx tingmärgiga ning vahejaotuskapp CxxxxDPxx
tingmärgiga.
Lõpp punkt on projekteeritud igasse masti, millel on ühendus kliendiga. Ühest lõpp punktist on
võimalik viia kliendiliin kuni neljale erinevale majapidamisele. Lõpp punktide asukoha määramisel
on arvestatud ka perspektiivsete ühendustega. Lõpp punkti otsatuskarp, milles alamkliendiliin
ühendatakse läbi pistikliite, paigaldatakse masti kõrgemasse otsa sideliini kõrvale.
Lisaks kappidele ja lõpp punktidele on projektiga ära määratud olemasolevate mastide vahetuse
vajadus ning mastide lisatugede paigaldamise vajadus. Mastide vahetuse vajadus oleneb masti
seisukorrast või juhtme gabariidist. Uued mastid peavad olema puidust tüvega ning sobima
keskkonda. Mastitüüp või mastitoe tüüp määratakse tööprojektis.
1.9. Multitorustik
Magistraalliin paigaldatakse terve projekti ulatuses multitorusse, mis võimaldab tulevikus uusi si-
dekaableid paigaldada puhumismeetodil. Multitorusse asuvad mikrotorud ning ühele lõpp punktile
tuleb reserveerida üks mikrotoru. Mitme paralleelselt kulgeva multitoru asemel eelistada ühte
suuremat mikrotorude arvuga multitoru. Mikrotorusüsteem paigaldada vastavalt tootja poolsetele
juhistele jälgides paigaldustemperatuure, kasutades ettenähtud töövahendeid ja -meetodeid,
järgides nii paigaldusaegseid kui ka puhumiseks sobivaid painderaadiuseid. Mikrotorusüsteem peab
olema korralikult dokumenteeritud ja mikrotorude peavad olema standardi kohaselt tuvastatavad
ka hilisemaks kaablite puhumiseks. Värvikood peab olema nähtav ja torustik peab olema
standardsete meetoditega puhumistööks ligipääsetav. Vältimaks vee sattumist mikrotorusse tuleb
tagada kõigi ühenduste ja lõppude hermeetilisus.
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRUMAAKONNAS JA JÄRVA MAAKONNAS (P2024-08)
VT2103
Side välisvõrk
Projekti nr. 24019 Projekti koostaja: Hepta Group Energy OÜ
Staadium: Eelprojekt Vastutav spetsialist: Sander Kulp
Versioon: v01 Projekteerija: Marek Banko
Dokument: 2401_EP_ENV-4-01_Seletuskiri-VT2103 Kuupäev: 21.08.2024
8 / 11
Kõik pinnasesse paigaldatavad multitorud vastavad tugevusastme kaitsele 1250N.
1.10. AS Gaasivõrk
• AS-i Gaasivõrk gaasipaigaldise kaitsevööndis kaevetööde teostamiseks on vajalik eelnevalt
taotleda AS-ilt Gaasivõrk kaitsevööndis tegutsemise luba ning kutsuda objektile kohale AS-
i Gaasivõrk järelevalve.
• Ehitamisel tuleb kasutada mehhanisme, töövõtteid ja –meetodeid, mis välistavad
gaasipaigaldise ja sellega seotud rajatiste kahjustamist. Kõigi ehitusperioodil töömaal
tekkinud vigastuste likvideerimine toimub ehitustööde teostaja ja vastutaja kulul.
• Gaasipaigaldise ja/või katoodkaitsekaabli lahtikaevamisel ja täpse asukoha tuvastamisel
tuleb kaitsevööndis kaevata labidaga.
• Kui ehitustööde käigus muutub pinnase tasapind gaasivõrgu armatuuri kaitsekapede ja
gaasireguleerkappide ümbruses, siis tuleb gaasivõrgu armatuuri kaitsekaped ja
gaasireguleerkapid tõsta õigele tasapinnale. Selleks tellida täiendavad tööd AS Gaasivõrk
poolt aktsepteeritud ettevõtte käest.
• Peale tööde teostamist peavad AS Gaasivõrk gaasitorud jääma nõuetekohasele sügavusele.
Näha ette kõik meetmed olemasolevate AS Gaasivõrk gaasitorude kaitseks tagamaks
nende säilivus ehitustööde käigus, tagada nõuetekohased sügavused. Tagada trasside
paiknemisel vastavus EVS 843 standardi nõuetega. Tegevuse korraldamisel gaasitrassi
kaitsevööndis juhinduda ehitusseadustiku § 70 ja § 76 nõuetest ning Majandus- ja
taristuministri määrusest nr 73.
• Tööde teostamine gaasipaigaldise kaitsevööndis võib toimuda kooskõlastatult AS-I
Gaasivõrk järelevalvega ja ainult töö- või põhiprojekti alusel.
• Lahti kaevatud gaasitorustik on vajalik enne kinni ajamist ette näidata AS Gaasivõrk
järelevalve esindajale.
• Peale pinnase taastamise töid peavad olema gaasikaped terve ja nähtavad ning need tuleb
näidata ette AS Gaasivõrk järelevalvele.
• Ehitaja peab lisaks arvestama projektile antud seisukoha märkustega.
TAIMEDE KAITSE
2.1. Soovituslikud hooldusvõtted
Kõikidele puudele ning põõsastele ja hekkidele teostada hoolduslõikus. Soovituslikud hooldusvõtted
aitavad säästa olemasolevat loodust, haljastusväärtust ja taastushaljastus väärtust. Teostataval
hoolduslõikusel tuleb jälgida võra vähendamise mahtu, mis ei tohiks ületada 15%. Vajaminev
hoolduslõikus on tuleb läbi viia erialaspetsialisti poolt (vähemalt arborist II kutsetunnistusele
vastav kvalifikatsioon). Vastavad erialaspetsialistid on saadavad näiteks Eesti Arboristide Ühingu
kaudu. Ehitustöödel tuleb vältida puukoorte lõhkumist. Kaevetöödel ei tohi juuri läbi raiuda või
lõhki rebida, vaid juured tuleb eemaldada hargnemiskohtadelt. Puujuurte ümbertõstmisel mitte
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRUMAAKONNAS JA JÄRVA MAAKONNAS (P2024-08)
VT2103
Side välisvõrk
Projekti nr. 24019 Projekti koostaja: Hepta Group Energy OÜ
Staadium: Eelprojekt Vastutav spetsialist: Sander Kulp
Versioon: v01 Projekteerija: Marek Banko
Dokument: 2401_EP_ENV-4-01_Seletuskiri-VT2103 Kuupäev: 21.08.2024
9 / 11
murda juuri kokku. Juurekaelasid ei tohi matta ka ehituse ajaks. Igasugune puuvõrade või põõsaste
kujundamine ja puittaimestiku raie kaitsealuses pargis tuleb enne ehitustööde alustamist
kooskõlastada Keskkonnaametiga. Kaevetöödest üle jäänud kaevise (va muld) laotamine pargi
territooriumile on keelatud. Ehitustööde planeerimisel tuleb arvestada lindude pesitsusperioodiga
(01.04 kuni 31.07)
2.2. Puude kaitsmine
Kaevetöö tegemisel võra projektsioonialal paigaldatakse puudele tüvekaitsed. Ehitustöödel
väärtuslike ja eriti väärtuslike puude- või taimerühma kaitsmiseks kasutada tarastamist 1,5 m
kõrguse taraga järgmiselt, et puude võrad jäävad tara sisse. Kui kaitstavad taimed asuvad
ehitusplatsi ääres, võib tarastada ümber haljastu, või ehitada tara ainult ehitusplatsi poolsele
küljele. Tarastatud ala ei tohi kasutada materjali laoplatsina.
Puutüve ümber tehakse püstplankudest kinnitatud kaitse, kus tüve ja plankude vahele asetatakse
pehme polster. Kui töötingimused puu all ei ole tööd võimaldavad, võib enne töö alustamist
kokkuleppel haljastusspetsialistiga kärpida puu alumisi oksi. Lõige tuleb teostada kas tüve või
lähima jämedama oksa vastast, jätmata tüügast ja kahjustamata oksakraed. Töö õppedes
eemaldatakse tööaegsed kaitseehitised.
2.3. Puujuurte kaitsmine
Kaevetööd lähemal, kui 2m puutüvest teostatakse käsitsi ning vajadusel kasutada Airspade
kaevamise meetodit. Suurte puude juuri lõigatakse võimalikult vähe. Üle 40mm läbimõõduga
juurte läbilõikamine kooskõlastada haljastusspetsialistiga. Lõige teha võimalikult väikese
lõikepinnaga, kaldega allapoole tüve suunas. Katki rebitud juureotsad ristisuunaliselt ära lõigata.
Puujuurte kuivamise vältimiseks kastetakse lahtises süvendis paljandunud puujuuri ning kaetakse
seejärel savika mulla ja geotekstiiliga(aurumise vältimiseks). Hilisem kastmine vähemalt 1x
nädalas põhjalikult. Pikemalt lahti olevas süvendis kaitstakse juuri juurevõrguga(puupostidele
toetatud jäik võrk),millele toetub geotekstiil. Vajadusel asetatakse juurestiku ja piirde vahele
kastmistoru. Puujuurte külmumise vältimiseks on paljandunud murdunud juurte katmine vajalik
temperatuuri langemisel alates –10 0C. Kaetakse juurevõrgu, geotekstiili ja kuivast poorsest
materjalist külmaisolatsiooniga, (penoplast, kivivill vms ehitussoojustusmaterjal). Kergesti
variseva pinnase puhul, kus puujuured võivad kahjustuda pinnase nihkumise tagajärjel, rajatakse
tugiseinad puujuurte kaitsmiseks. Töötamisel säilitatavate puude all kaitstakse juurestiku ala
maapinnale laotatud õhulise liivakihiga, mille peale pannakse killustik. Liivakihi võib asendada
geotekstiiliga.
EHITAMINE KAITSEALADES
3.1. Keskkonnakaitse
Ehitustööd peab tegema keskkonnasäästvalt vastavalt kehtivale kaitse-eeskirjale.
Ehitamisel kasutatavad masinad ja mehhanismid ei tohi lekkida õli, kütust ega muid kemikaale.
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRUMAAKONNAS JA JÄRVA MAAKONNAS (P2024-08)
VT2103
Side välisvõrk
Projekti nr. 24019 Projekti koostaja: Hepta Group Energy OÜ
Staadium: Eelprojekt Vastutav spetsialist: Sander Kulp
Versioon: v01 Projekteerija: Marek Banko
Dokument: 2401_EP_ENV-4-01_Seletuskiri-VT2103 Kuupäev: 21.08.2024
10 / 11
Pärast ehitamist tuleb ümbrus korrastada ja ehituspraht käidelda vastavalt kehtivale
seadusandlusele ning kooskõlas Rakvere linna heakorraeeskirja ja jäätmehoolduseeskirjaga.
Demonteeritavad konsoolid ja valgusti utiliseerida nõuetekohaselt.
Ehitusmaterjale ei tohi põletada.
PUUTUMUSED RIIGITEEGA
4.1. Ristumine riigimaanteega maa-liiniga
1. 15129 Paide-Roovere-Kuimetsa tee 93701:005:0084
4.2. Kulgemine riigimaanteel maa-liiniga
2. 15129 Paide-Roovere-Kuimetsa tee 93701:005:0084
Kaablipaigaldus nõuded riigiteede katastris
1. Kaabli paigaldamise sügavus teemaal minimaalselt 1,0 m ümbritsevast maapinnast.
2. Lähemal kui 1,0 m muldkeha nõlvale kaabli paigaldamise minimaalne sügavus 1,2 m
ümbritsevast maapinnast. Kaabel paigaldada 750N kaitsetorusse.
3. Ristisuunalised läbiminekud olemasolevast teest teostada kinnisel meetodil. Minimaalne
sügavus 1,5 m ümbritsevast maapinnast (põhimaantee või arendushuviga tee katte ja
mulde alla min. 2,2m), süvendi korral teekatte pinnast. Kaabel paigaldada 1250N
kaitsetorusse kogu teemaa laiuses.
4. Kraavidest ristisuunalisel läbiminekul kaabli minimaalne sügavus kraavi põhjast 1,0m.
Kaabel paigaldada metallist või 750N kaitsetorusse vastavalt kehtivatele standarditele.
5. Teega paralleelselt kulgevaid kaableid kraavidesse (põhi, nõlvad) mitte planeerida. Teiste
tehniliste võimaluste puudumisel paigaldada kaablid kraavi põhja 750N kaitsetorusse min
1,0 m sügavusele. Soovitatavalt teostada töö suundpuurimisega. Kaablipaigaldamise jälg
tuleb tihendada, põhi ja nõlvad taastada vastavalt endisele olukorrale.
6. Ristumisel riigiteega, peab õhuliini kõrgus teest olema min. 7 meetrit, k.a ühisriputusega
sideliinide puhul. (Tulenevalt standardist EVS-EN 50341-2-20:2018). Kergliiklusteede
puhul 4,5m pinnast.
JOONISED
TÜÜP KOOD NIMI
Ristmevälja sõlm-joonis E201- E202
24019_EP_ENV-1-02_Ristmevälja_sõlm-joonised-VT2103
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRUMAAKONNAS JA JÄRVA MAAKONNAS (P2024-08)
VT2103
Side välisvõrk
Projekti nr. 24019 Projekti koostaja: Hepta Group Energy OÜ
Staadium: Eelprojekt Vastutav spetsialist: Sander Kulp
Versioon: v01 Projekteerija: Marek Banko
Dokument: 2401_EP_ENV-4-01_Seletuskiri-VT2103 Kuupäev: 21.08.2024
11 / 11
Asendiplaan E200 24019_EP_ENV-4-01_Asendiplaan-VT2103
FO R
M A
A T
A 4
2 10
x 2
97 m
m
Joonise nr
Projekti nr
Kuupäev
Mõõtkava
Projekteerija Hepta Group Energy OÜ Mäealuse 2/1 12618 TALLINN EESTI Tel. +372 5179698 [email protected]
Projekti nimetus
Joonise nimetus
Tellija
Staadium
05.09.2024
Enefit Connect OÜ, Veskiposti tn 2 Tallinn Harjumaa 10138 Tel +372 777 404, [email protected]
Liitumise sideskeem, Aseri alevik VT2103
E101
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRU MAAKONNAS JA JÄRVA MAAKONNAS (P2024-08)
Kontrollija
Projektijuht
Projekteerija
S. Kulp
S. Kulp
M. Banko
24019EP -
g547
65.564
g548
65.561
g549
65.370
g550
65.435
g551
65.480
g552
65.508
g553
65.507
g554
65.501
g555
65.213
g556
65.149
HTO_108408
65.540 g557
65.540
g558
65.157
g559
65.226
g560
65.270
g561
65.303
g562
65.536
g563
65.555
g564
65.368
g565
65.352
g566
65.421
g567
65.360
g568
65.477
g569
65.551
g570
65.482
g571
65.434
TINGMÄRGID
Projekteeritud sideliin maasisene Katastripiir
Kasutusõiguse ala
FO R
M A
A T
A 3
2 97
x 4
20 m
m
Isikliku kasutusõiguse seadmise plaan Aseri alevik, Viru-Nigula vald, Lääne maakond,15129 Paide-Roovere-Kuimetsatee,
Katastri nr. 93701:005:0084 M 1:500
Pos 1
Koostas: Marek Banko Hepta Group Energy OÜ projekteerija
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRUMAAKONNAS
Töö nr. 24019
Töö tellija: Enefit AS
JA JÄRVA MAAKONNAS (P2024-08) VT2103
LK 1/7
g37
66.668
g40
66.828
g43
66.770
g44
66.709
g45
66.829
g46
66.841 g47
66.883
g48
66.838
g49
66.818
g50
66.812
g51
66.745
2
52
g53
66.808
g54
66.698
g55
66.560
g56
66.652
g57
66.620
g58
66.491
g59
66.663
g60
66.563
g61
66.558
g62
66.538
g63
66.422
g64
66.685
g65
66.387
g66
66.552
g67
66.515
g68
66.227
g69
66.613
g70
66.705
g71
66.768
g72
66.739
g73
66.610
g74
66.464
g75
66.575
g76
66.506
g77
66.544
g78
66.254
g79
65.933
g80
66.379
g81
66.373
g82
66.088
g83
65.882
g85
66.338
g88
66.272
g90
66.328
TINGMÄRGID
Katastripiir
Kasutusõiguse ala
Projekteeritud side-õhuliin
FO R
M A
A T
A 3
2 97
x 4
20 m
m
Isikliku kasutusõiguse seadmise plaan Aseri alevik, Viru-Nigula vald, Lääne maakond,15129 Paide-Roovere-Kuimetsatee,
Katastri nr. 93701:005:0084 M 1:500
Pos 2
Koostas: Marek Banko Hepta Group Energy OÜ projekteerija
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRUMAAKONNAS
Töö nr. 24019
Töö tellija: Enefit AS
JA JÄRVA MAAKONNAS (P2024-08) VT2103
LK 2/7
g121
65.530
g122
65.663
g123
65.437
g124
65.706
g125
65.720
g126
65.624
g127
65.626
g128
65.505
g129
65.296
g130
65.542
g131
65.506
g132
65.597
g133
65.410
g134
65.459
g135
65.414
g136
65.611
g137
65.439
g138
65.314
g139
65.518
g140
65.605
g141
65.635
g142
65.572
g143
65.664
g144
65.580
g145
65.767
g146
65.573
g147
65.492
g148
65.563
g149
65.589
g685
65.188
TINGMÄRGID
Projekteeritud sideliin maasisene Katastripiir
Kasutusõiguse ala
FO R
M A
A T
A 3
2 97
x 4
20 m
m
Isikliku kasutusõiguse seadmise plaan Aseri alevik, Viru-Nigula vald, Lääne maakond,15129 Paide-Roovere-Kuimetsatee,
Katastri nr. 93701:005:0084 M 1:500
Pos 3
Koostas: Marek Banko Hepta Group Energy OÜ projekteerija
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRUMAAKONNAS
Töö nr. 24019
Töö tellija: Enefit AS
JA JÄRVA MAAKONNAS (P2024-08) VT2103
LK 3/7
g152
65.366
g153
65.299
g154
65.297
g155
65.227
g156
64.638 g157
64.859
g158
64.555
g159
65.302
g160
65.308
g161
65.274
g162
64.756
g163
65.137
g164
65.223
g165
65.050
g166
64.613
g168
65.234
g169
65.177
g170
65.093
g171
65.132
g172
65.130
g173
65.263
g174
65.274
g175
65.277
g176
65.141
g182
65.221
g183
65.150
g184
64.916
g185
65.247
g186
65.315
g187
65.339
g188
65.316
g189
65.299
g190
65.288
g191
65.298
g192
65.292
g193
65.134
g194
65.275
g195
65.238 g196
65.274
g197
65.241
g198
65.262
9
65.251
g200
65.263
g201
65.251
g202
65.204
g203
65.160
g204
65.193
g205
65.249
g206
65.314
g207
65.311
g208
65.280
g209
65.307
g210
65.361
g211
65.348
g212
65.362
g213
65.530
g214
65.475
g215
65.324
g216
65.384
g217
65.404
g218
65.410
g219
65.366
HTO_473539
65.599
g220
65.599
g221
65.477
g222
65.286
g223
66.084
HTO_584569
65.321
g224
65.321
g225
65.174
g226
65.362
g227
65.397
g228
65.189
g229
65.085
g230
65.059
g231
65.404
g232
65.343
g233
65.345
g234
65.325
g235
65.231
g236
65.072
g237
64.952 g238
65.276
g239
64.983
g240
65.067
g241
65.082
g242
65.214
g243
65.354
g244
65.383
g245
65.456
g246
65.440
g247
65.287
g248
65.193
g249
65.236
g250
65.086
g251
65.460
g252
65.256
g253
65.295
g254
65.045
g255
65.407
g256
65.437
g257
65.472
g260
65.405
g261
64.804
g262
65.177
g263
65.273
TINGMÄRGID
Projekteeritud sideliin maasisene Katastripiir
Kasutusõiguse ala
Projekteeritud plastkaev
FO R
M A
A T
A 3
2 97
x 4
20 m
m
Isikliku kasutusõiguse seadmise plaan Aseri alevik, Viru-Nigula vald, Lääne maakond,15129 Paide-Roovere-Kuimetsatee,
Katastri nr. 93701:005:0084 M 1:1000
Pos 4
Koostas: Marek Banko Hepta Group Energy OÜ projekteerija
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRUMAAKONNAS
Töö nr. 24019
Töö tellija: Enefit AS
JA JÄRVA MAAKONNAS (P2024-08) VT2103
LK 4/7
g258
65.462
g259
65.443
g260
65.405
g261
64.804
g262
65.177
g263
65.273
g264
65.262
g265
65.279
g266
64.736
g267
65.463
g268
65.472
g269
65.472
g270
65.482
g271
65.453
g272
65.449
g273
64.723
g274
65.487
g275
65.500
g276
65.440
g277
64.800
g278
65.247
g279
65.332
g280
65.516
g281
65.535
g282
65.543
g283
65.523
g284
65.549
g285
64.693
g286
65.262
g287
65.397
g288
65.274
g289
64.709
g290
65.519
g291
65.472
g292
65.517
g293
65.493
g294
65.484
g295
65.476
g296
64.639
g297
64.588
g298
65.407
g299
65.424
g300
65.393
g301
65.175
g302
65.183
g303
64.518
g304
65.363
g305
65.371
g306
65.332
g307
65.250
g308
65.257 g309
65.191
g310
64.204
g311
64.813
g312
64.892
g313
64.598
g314
64.662
g315
64.571
g316
64.010
g317
64.469
g318
63.950
g319
64.054
g320
64.163
g321
65.117
g322
65.165
g323
65.144
g324
65.129
g325
65.142
g326
65.173
g327
64.472
g328
64.507
g329
65.120
g330
65.120
g331
65.115
g332
64.620
g333
64.564
TINGMÄRGID
Projekteeritud sideliin maasisene Katastripiir
Kasutusõiguse ala
FO R
M A
A T
A 3
2 97
x 4
20 m
m
Isikliku kasutusõiguse seadmise plaan Aseri alevik, Viru-Nigula vald, Lääne maakond,15129 Paide-Roovere-Kuimetsatee,
Katastri nr. 93701:005:0084 M 1:1000
Pos 4
Koostas: Marek Banko Hepta Group Energy OÜ projekteerija
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRUMAAKONNAS
Töö nr. 24019
Töö tellija: Enefit AS
JA JÄRVA MAAKONNAS (P2024-08) VT2103
LK 5/7
g325
65.142
g326
65.173
g328
64.507
g329
65.120
g330
65.120
g331
65.115
g332
64.620
g333
64.564
g334
64.553
g335
64.627
g336
65.160
g337
65.107
g338
65.127
g339
65.088
g340
65.031
g341
65.031
g342
65.014
g343
64.742
g344
64.994
g345
65.020
g346
64.609
g347
64.460
g348
64.747
g349
64.681
g350
65.072
g351
65.049
g352
65.104
g353
65.122
g354
65.091
g355
64.732
g356
64.807
g357
65.217
g358
65.175 g359
65.138
g360
65.153
g361
65.192 g362
64.855
TINGMÄRGID
Projekteeritud sideliin maasisene Katastripiir
Kasutusõiguse ala
FO R
M A
A T
A 3
2 97
x 4
20 m
m
Isikliku kasutusõiguse seadmise plaan Aseri alevik, Viru-Nigula vald, Lääne maakond,15129 Paide-Roovere-Kuimetsatee,
Katastri nr. 93701:005:0084 M 1:1000
Pos 4
Koostas: Marek Banko Hepta Group Energy OÜ projekteerija
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRUMAAKONNAS
Töö nr. 24019
Töö tellija: Enefit AS
JA JÄRVA MAAKONNAS (P2024-08) VT2103
LK 6/7
g360
65.153
g361
65.192 g362
64.855
g363
64.768
g364
65.139 g365
65.159
g366
65.085
g367
65.077 g368
65.015
g369
64.904
g370
64.821
g371
64.980 g372
65.020
g373
64.930
g374
64.942
g375
65.050
g376
65.041
g377
64.939
g378
64.978
g379
65.036
g380
64.939
g381
64.935
g382
65.063
g383
65.018
g384
64.903
g385
64.909
g386
64.884
g387
64.920
g388
65.014
g389
64.894
g390
64.895
g391
64.722
g392
64.156
g393
64.859
g394
64.892
g395
65.050
g443
64.359
g444
64.533
g445
64.547
g446
64.555
g447
64.692
g448
64.606
g449
64.563
g450
64.537 g451
64.569
g452
64.638
g453
64.784
g454
64.752
g455
64.728
g456
65.325
TINGMÄRGID
Projekteeritud sideliin maasisene Katastripiir
Kasutusõiguse ala
FO R
M A
A T
A 3
2 97
x 4
20 m
m
Isikliku kasutusõiguse seadmise plaan Aseri alevik, Viru-Nigula vald, Lääne maakond,15129 Paide-Roovere-Kuimetsatee,
Katastri nr. 93701:005:0084 M 1:1000
Pos 4
Koostas: Marek Banko Hepta Group Energy OÜ projekteerija
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRUMAAKONNAS
Töö nr. 24019
Töö tellija: Enefit AS
JA JÄRVA MAAKONNAS (P2024-08) VT2103
LK 7/7
|
g1 66.511
g2 66.628
g3 66.559
g4 66.514
g5 66.480
g6 66.513
g7 66.511 g8 66.564
g9 66.590 g1
66.583
g11 66.588
g12 66.629
g13 66.545
g14 66.509
g15 66.494
g16 66.577
g17 66.499
g18 66.531
g19 66.499
g20 66.579 g21
66.585
g22 66.570
g23 67.563
g24 66.502
g25 66.319
g26 66.209
g27 66.368
g28 66.347
g29 66.329
g30 66.399
g31 66.386
HTO_605505 66.496 g32 66.496
g33 66.424
g34 66.425
g35 66.454
g36 66.483
g37 66.668
g38 66.637
g39 66.769
g40 66.828
g41 66.789
g42 67.035
g43 66.770
g44 66.709
g45 66.829
g46 66.841 g47 66.883
g48 66.838
g49 66.818
g50 66.812
g51 66.745
2 52
g53 66.808
g54 66.698
g55 66.560
g56 66.652
g57 66.620
g58 66.491
g59 66.663
g60 66.563
g61 66.558
g62
66.538
g63 66.422
g64 66.685
g65 66.387
g66 66.552
g67 66.515
g68 6 .227
g69 66.613
g70 66.705
g71 66.768
g72 66.739
g73 66.610
g74 66.464
g75 66.575
g76 66.506
g77 66.544
g78 66.254
g79 65.933
g80 66.379
g81 66.373 g82 66.088
g83 65.882
g84 66.133
g85 66.338
g86 66.131
g87 66.410
g88 66.272
g89 66.214
g90 66.328
g91 66.213
g92 66.041
g93 66.296
g94 65.954
g95 65.906
g96 65.739
g97 66.023
g98 66.097
g99 66.100
g100 65.979
g101 65.983
g102 65.877
g103 65.546
g104 65.696
g105 65.785
g106 65.738
g107 65.631
g108 65.889
g109 65.520
g110 65.599
g111 65.924
g112 65.923
g113 65.935
g114 65.822
g115 65.827
g116 65.730
g117 65.487
g118 65.626
g119 65.722
g120 65.644
g121 65.530
g122 65.663
g123 65.437
g124 65.706
g125 65.720
g126 65.624
g127 65.626
g128 65.505
g129 65.296
g130 65.542
g131 65.506
g132 65.597
g133 65.410
g134 65.459
g135 65.414
g136 65.611
g137 65.439
g138 65.314
g139 65.518
g140 65.605
g141 65.635
g142 65.572
g143 65.664
g144 65.580
g145 65.767
g146 65.573
g147 65.492
g148 65.563
g149 65.589
HTO_310512 65.804 g150 65.804
HTO_351590 65.405 g151 65.405
g152 65.366
g153 65.299
g154 65.297
g155 65.227
g156 64.638
g157 64.859 g158 64.555
g159 65.302
g160 65.308
g161 65.274
g162 64.756
g163 65.137
g164 65.223
g165 65.050
g166 64.613
g167 65.066
g168 65.234
g169 65.177 g170
65.093
g171 65.132
g172 65.130
g173 65.263 g174 65.274
g175 65.277
g176 65.141
g177 65.362
g178 65.724
g179 65.785
g180 65.663
g181 65.642
g182 65.221
g183 65.150
g184 64.916
g185 65.247
g186 65.315
g187 65.339
g522 65.700
g523 65.592
g524 65.394
g525 65.257
g526 65.098
g527 64.268
g528 65.171
g529 64.417
g530 64.379
g544 66.304
g545 65.564
g546 66.345
g547 65.564
g548 65.561
g549 65.370
g550 65.435
g551 65.480
g552 65.508
g553 65.507
g554 65.501
g555 65.213
g556 65.149
HTO_108408 65.540
g557 65.540
g558 65.157
g559 65.226
g560 65.270
g561 65.303
g562 65.536
g563 65.555
g564 65.368
g565 65.352
g566 65.421
g567 65.360
g568 65.477
g569 65.551
g570 65.482
g571 65.434
g572 65.599
g573 65.688
g574 65.630 g575 65.656
g576 66.151 g577
66.168
g578 66.188 g579 66.165
g580 65.641
g581 65.738
g582 65.744
g583 65.741
g584 65.655
g585 66.147 g586
66.173
g587 65.632
g588 65.655
g589 66.127
g590 65.972
g591 67.794
HTO_912362 65.939
g592 65.939
g593 65.823
g594 65.725
g595 65.650 g596
66.093
g597 67.859
g598 67.928
g599 67.934
g600 66.107
g601 66.415
g602 66.577 g603
66.528
g604 65.936
g605 65.985
g606 65.938
g607 66.145
g608 65.993
g609 66.034
g610 66.061
g611 66.039
g612 66.306
g613 66.238
g614 67.907
g615 67.910
g616 66.456
g617 67.217
g618 66.470
g619 66.376
g620 66.385
g621 66.335
g622 66.407
g623 66.640
g624 66.698
g625 66.824
g626 66.700
g627 66.758
g628 66.691
g629 66.798
g630 66.797
g631 66.762
g632 67.031
g633 66.619
g634 68.281
g635 67.408
g636 67.522
g637 67.758
g638 68.600
g639 67.398
g640 67.425
g641 67.531
g642 67.431
g643 67.444
g644 67.416 g645 67.423
g646 67.686
g647 67.523
g648 67.816
g649 67.524
g650 67.412
g651 67.640
g652 67.669
g653 67.652
g654 68.973
g655 67.086
g656 67.129
g657 66.535
g658 66.481
g659 66.261
g660 66.275
g661 66.137
g662 65.892
g663 65.546
g664 65.370
g665 65.530
g666 65.203
g667 65.302
g668 64.893
g669 65.123
g670 65.351
g671 65.888 g672 65.883
g685 65.188
g686 63.788
g687 63.993
g688 63.828
g689 63.812
Teostada mastivahetus//Põhjus: gabariit Paigaldada 10m puitmast (8m maapinnast).
Teostada mastivahetus//Põhjus: gabariit Paigaldada 10m puitmast (8m maapinnast).
Teostada mastivahetus//Põhjus: gabariit Paigaldada 10m puitmast (8m maapinnast).
Teostada mastivahetus//Põhjus: gabariit Paigaldada 10m puitmast (8m maapinnast).
Olemasolev ELA SA kaev 085K75>085M35
Vt Ristmevälja joonis nr.1
Teostada mastipüstitus//Põhjus: Sideõhuliini pikendus. Paigaldada 10m puitmast (8m maapinnast).
Kinnitada eraomanikuga masti kasutust ning sideõhuliini jätkamist
TINGMÄRGID, PROJKETEERITUD
Projekteeritud side vahejaotuspunkt (kapp mastil). Mõõdud 700x400x300mm.
Projekteeritud side jaotuspunkt (kapp maapinnal). Mõõdud ca1100x700x430mm, kõrgus maapinnast ca 1,3m.
Projekteeritud lõpp-punkt mastil (ühenduskarp mastil). Mõõdud 150x200mm.
Puhumiskaevik
Projekteeritud puitmast (kõrgus/tüüp väljatoodud viites)
Projekteeritud puitmasti toe komplekt (kõrgus/tüüp väljatoodud viites).
Projekteeritud maasisene multitoru(side) - DB-klassi (Direct Bury) märgistusega, min 1250N.
Projekteeritud perspektiivne kliendiliin(side) - maa sees.
Projekteeritud maasisene multitoru(side) kinnisel meetodil - puurumistoru PE D75, 1250N.
Projekteeritud multitoru(side) ol.oleval elektrivõrgu õhuliinil.
Projekteeritud perspektiivne kliendiliin(side) - õhuliin.
Taastatav haljasala - ca 459 m2.
Taastatav freespuru-, kruusa- või killustikkate - ca 4.5m2.
Suundpuurimise lõpu- ja alguskaevik.
MURUKÜLV
TAGASITÄIDE (Kt=0.98, Kf≥0.5 m/ööp) (märkus 3) LIIV (Kt=0.98, Kf>0.5 m/ööp) LIIV Kf>0.5 m/ööp OLEMASOLEV PINNAS Kt=0.95
15 cmSõelutud mineraalmuld kasvukihina
Haljasala taastamine
10 cm
Hoiatuslint
Projekt. multitoru
0, 7
0, 1
MÄRKUSED
1. Kõik tööd teostada vastavalt kehtivatele normatiividele ja seadustele.
2. Koordinaadid joonistel on L-EST süsteemis, kõrgused EH2000 süsteemis.
3. Projektis kasutatud peamiselt lahtist meetodit, v.a teisiti tähistatud kohtades (jälgida viiteid).
4. Haljasalal paigaldada kaabel 0,7m sügavusele, sõidutee 1m ning kõnnitee alla 1m sügavusele. Kitsaskohtades teostada kaevetööd käsitsi, vajadusel toestada teisi tehnovõrke.
5. Arvestada ol. olevate tehnorajatiste kaablikaitsevöönditega, milles kõikvõimalikud kaeve ja mullatööd ilma kaablivaldaja loata on keelatud. Tööde teostamine liinirajatiste kaitsevööndis võib toimuda kooskõlastatult vastava rajatise valdaja järelevalve üksusega.
6. Olemasolevad katted taastatakse samaväärseks kogu projekti ulatuses.
Hoiatuslint
Projekt. kaabel
PAEKILLUSTIK E>170 MPa fraktsioon 16/32 fraktsioon 32/63 kiilekillustiku fraktsioon 4/16-kulu 25 kg/m2
DREENKIHT LIIVAST (Kt=0.98, Kf>2.0 m/ööp) TAGASITÄIDE (Kt=0.98, Kf≥0.5 m/ööp) (märkus 3) LIIV (Kt=0.98, Kf>0.5 m/ööp) LIIV Kf>0.5 m/ööp OLEMASOLEV PINNAS Kt=0.95
12 cm
10 cm 15 cm
20 cm
10 cm
Tüüp 5 Kruusa taastamine
Ol.olev asfalt
PAEKILLUSTIK
0, 1
E201
E202
E203
Joonise nr
Projekti nr
Kuupäev
Mõõtkava
Projekteerija Hepta Group Energy OÜ Mäealuse 2/1 12618 TALLINN EESTI Tel. +372 5179698 [email protected]
Projekti nimetus
Joonise nimetus
Tellija
Staadium
30.08.2024
Enefit AS // Reg kood 16130213 Lelle tn 22, Kesklinna linnaosa, 11318 Tallinn, Harju maakond Tel +372 55522205 [email protected]
Asendiplaan (VT2103)
E201
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRU MAAKONNAS JA JÄRVA MAAKONNAS (P2024-08)
Kontrollija
Projektijuht
Projekteerija
S. Kulp
S. Kulp
M. Banko
24019 (VT2103)EP 1:1000
g1 66.511
g2 66.628
g3 66.559
g4 66.514
g5 66.480
g6 66.513
g7 66.511 g8 66.564
g9 66.590 g1
66.583
g11 66.588
g12 66.629
g13 66.545
g14 66.509
g15 66.494
g16 66.577
g17 66.499
g18 66.531
g19 66.499
g20 66.579 g21 66.585
g22 66.570
g23 67.563
g24 66.502
g25 66.319
g26 66.209
g27 66.368
g28 66.347
g29 66.329
g30 66.399
g31 66.386
HTO_605505 66.496 g32 66.496
g33 66.424
g34 66.425
g35 66.454
g36 66.483
g37 66.668
g38 66.637
g39 66.769
g40 66.828
g41 66.789
g42 67.035
g43 66.770
g44 66.709
g45 66.829
g46 66.841 g47 66.883
g48 66.838
g49 66.818
g50 66.812
g51 66.745
2 52
g53 66.808
g54 66.698
g55 66.560
g56 66.652
g57 66.620
g58 66.491
g59 66.663
g60 66.563
g61 66.558
g62
66.538
g63 66.422
g64 66.685
g65 66.387
g66 66.552
g67 66.515
g68 6 .227
g69 66.613
g70 66.705
g71 66.768
g72 66.739
g73 66.610
g74 66.464
g75 66.575
g76 66.506
g77 66.544
g78 66.254
g79 65.933
g80 66.379
g81 66.373 g82 66.088
g83 65.882
g84 66.133
g85 66.338
g86 66.131
g87 66.410
g88 66.272
g89 66.214
g90 66.328
g91 66.213
g92 66.041
g93 66.296
g94 65.954
g95 65.906
g96 65.739
g97 66.023
g98 66.097
g99 66.100
g100 65.979
g101 65.983
g102 65.877
g103 65.546
g104 65.696
g105 65.785
g106 65.738
g107 65.631
g108 65.889
g109 65.520
g110 65.599
g111 65.924
g112 65.923
g113 65.935
g114 65.822
g115 65.827
g116 65.730
g117 65.487
g118 65.626
g119 65.722
g120 65.644
g121 65.530
g122 65.663
g123 65.437
g124 65.706
g125 65.720
g126 65.624
g127 65.626
g128 65.505
g129 65.296
g130 65.542
g131 65.506
g132 65.597
g133 65.410
g134 65.459
g135 65.414
g136 65.611
g137 65.439
g138 65.314
g139 65.518
g140 65.605
g141 65.635
g142 65.572
g143 65.664
g144 65.580
g145 65.767
g146 65.573
g147 65.492
g148 65.563
g149 65.589
HTO_310512 65.804 g150 65.804
HTO_351590 65.405 g151 65.405
g152 65.366
g153 65.299
g154 65.297
g155 65.227
g156 64.638
g157 64.859
g158 64.555
g159 65.302
g160 65.308
g161 65.274
g162 64.756
g163 65.137
g164 65.223
g165 65.050
g166 64.613
g167 65.066
g168 65.234
g169 65.177 g170
65.093
g171 65.132
g172 65.130
g173 65.263 g174 65.274
g175 65.277
g176 65.141
g177 65.362
g178 65.724
g179 65.785
g180 65.663
g181 65.642
g182 65.221
g183 65.150
g184 64.916
g185 65.247
g186 65.315
g187 65.339
g188 65.316
g189 65.299
g190 65.288 g191
65.298
g192 65.292
g193 65.134
g194 65.275
g195 65.238
g196 65.274
g197 65.241
g198 65.262 9 . 51
g200 65.263
g201 65.251
g202 65.204
g203 65.160
g204 65.193
g205 65.249
g206 65.314
g207 65.311
g208 65.280
g209 65.307
g210 65.361
g211 65.348
g212 65.362
g213 65.530
g214 65.475
g215 65.324
g216 65.384
g217 65.404
g218 65.410
g219 65.366
HTO_473539 65.599
g220 65.599
g221 65.477
g222 65.286
g223 66.084
HTO_584569 65.321
g224 65.321 g225 65.174
g226 65.362
g227 65.397
g228 65.189
g229 65.085
g230 65.059
g231 65.404
g232 65.343
g233 65.345
g234 65.325
g235 65.231
g236 65.072
g237 64.952
g238 65.276
g239 64.983
g240 65.067
g241 65.082
g242 65.214
g243 65.354
g244 65.383
g245 65.456
g246 65.440
g247 65.287
g248 65.193
g249 65.236
g250 65.086
g251 65.460
g252 65.256
g253 65.295
g254 65.045
g255 65.407
g256 65.437
g257 65.472
g258 65.462
g259 65.443
g260 65.405
g261 64.804
g262 65.177
g263 65.273
g264 65.262
g265 65.279
g266 64.736
g267 65.463
g268 65.472 g269 65.472
g270 65.482
g271 65.453
g272 65.449
g273 64.723
g274 65.487
g275 65.500
g276 65.440
g277 64.800
g278 65.247
g279 65.332
g280 65.516
g281 65.535
g282 65.543
g283 65.523
g284 65.549
g285 64.693
g286 65.262
g287 65.397
g288 65.274
g289 64.709
g290 65.519
g291 65.472
g292 65.517
g293 65.493
g294 65.484
g295 65.476
g296 64.639
g297 64.588
g298 65.407
g299 65.424
g300 65.393
g301 65.175
g302 65.183
g303 64.518
g304 65.363
g305 65.371
g306 65.332
g307 65.250
g308 65.257
g309 65.191
g310 64.204
g311 64.813
g312 64.892
g313 64.598
g314 64.662
g315 64.571
g316 64.010
g317 64.469
g318 63.950
g319 64.054
g320 64.163
g321 65.117
g322 65.165
g323 65.144
g324 65.129
g325 65.142
g326 65.173
g327 64.472
g328 64.507
g329 65.120
g330 65.120
g331 65.115
g332 64.620
g333 64.564
g334 64.553
g335 64.627
g336 65.160 g337 65.107
g338 65.127
g339 65.088
g340 65.031
g341 65.031
g342 65.014
g343 64.742
g344 64.994
g345 65.020
g346 64.609
g347 64.460
g348 64.747
g349 64.681
g350 65.072
g351 65.049
g352 65.104
g353 65.122
g354 65.091
g355 64.732
g356 64.807
g357 65.217
g358 65.175
g359 65.138
g360 65.153
g361 65.192
g362 64.855
g363 64.768
g364 65.139
g365 65.159
g366 65.085
g367 65.077 g368
65.015
g369 64.904
g370 64.821
g371 64.980
g372 65.020
g373 64.930
g374 64.942
g375 65.050
g376 65.041
g377 64.939 g378 64.978
g379 65.036
g380 64.939
g381 64.935
g382 65.063
g383 65.018
g384 64.903
g385 64.909
g386 64.884
g387 64.920
g388 65.014
g389 64.894
g390 64.895
g391 64.722
g392 64.156
g393 64.859
g394 64.892
g395 65.050
g396 64.888
g397 64.835
g398 64.804
g399 64.857
g400 64.727
g401 64.931
g402 64.919
g403 64.938
g404 64.891
g405 64.945 g406
64.943
g407 65.045
g408 65.043
g409 65.143
g410 65.120
g411 65.124
g412 65.113
g413 65.042
g414 64.914
g415 65.089 g416 65.065
g417 65.034 8 . 60
g419 65.073
g420 65.034
g421 64.935
g422 65.049
g423 64.346
g424 64.377
g425 64.360
g426 64.306
g427 64.300
g428 64.323
g429 64.316
g430 64.304
g431 64.779
g432 64.536
g443 64.359
g444 64.533
g445 64.547
g446 64.555
g447 64.692
g448 64.606
g449 64.563
g450 64.537
g451 64.569
g452 64.638
g453 64.784
g454 64.752
g455 64.728
g456 65.325
g457 65.687
g458 65.440
g459 65.452
g460 65.448
g461 65.910
g462 65.834
g463 65.939
g464 65.955
g465 65.500
g466 65.587
g467 65.666
g468 65.645
g469 65.642
g522 65.700
g523 65.592
g524 65.394
g525 65.257
g526 65.098
g527 64.268
g528 65.171
g529 64.417
g530 64.379
g531 65.007
g532 65.004
g533 64.978
g534 64.352
g535 64.377
g536 65.083
g537 64.138
g538 64.298
g539 65.686
g540 64.747
g541 65.217
g542 65.350
g543 65.228
g544 66.304
g545 65.564
g572 65.599
g573 65.688
g574 65.630 g575 65.656
g576 66.151 g577
66.168
g578 66.188 g579 66.165
g580 65.641
g581 65.738
g582 65.744
g583 65.741
g584 65.655
g585 66.147 g586
66.173
g587 65.632
g588 65.655
g589 66.127
g590 65.972
g591 67.794
HTO_912362 65.939
g592 65.939
g593 65.823
g594 65.725
g595 65.650 g596 66.093
g597 67.859
g598 67.928
g599 67.934
g600 66.107
g601 66.415
g602 66.577 g603
66.528
g604 65.936
g605 65.985
g606 65.938
g607 66.145
g608 65.993
g609 66.034
g610 66.061
g612 66.306
g613 66.238
g614 67.907
g615 67.910
g616 66.456
g617 67.217
g618 66.470
g629 66.798
g630 66.797
g631 66.762
g660 66.275
g663 65.546
g664 65.370
g665 65.530
g666 65.203
g667 65.302
g669 65.123
g670 65.351
g671 65.888 g672 65.883
g683 65.046
g684 65.167
g685 65.188
g686 63.788
g687 63.993
g688 63.828
g689 63.812
g690 63.767
g691 63.846 g692 63.841
g693 64.379
Teostada mastivahetus//Põhjus: gabariit Paigaldada 12m puitmast (10m maapinnast) koos toega.
Teostada mastivahetus//Põhjus: gabariit Paigaldada 12m puitmast (10m maapinnast) koos toega.
Vt Ristmevälja joonis nr.1
Teostada mastipüstitus//Põhjus: Sideõhuliini pikendus. Paigaldada 10m puitmast (8m maapinnast).
Kinnitada eraomanikuga masti kasutust ning sideõhuliini jätkamist
TINGMÄRGID, PROJKETEERITUD
Projekteeritud side vahejaotuspunkt (kapp mastil). Mõõdud 700x400x300mm.
Projekteeritud side jaotuspunkt (kapp maapinnal). Mõõdud ca1100x700x430mm, kõrgus maapinnast ca 1,3m.
Projekteeritud lõpp-punkt mastil (ühenduskarp mastil). Mõõdud 150x200mm.
Puhumiskaevik
Projekteeritud puitmast (kõrgus/tüüp väljatoodud viites)
Projekteeritud puitmasti toe komplekt (kõrgus/tüüp väljatoodud viites).
Projekteeritud maasisene multitoru(side) - DB-klassi (Direct Bury) märgistusega, min 1250N.
Projekteeritud perspektiivne kliendiliin(side) - maa sees.
Projekteeritud maasisene multitoru(side) kinnisel meetodil - puurumistoru PE D75, 1250N.
Projekteeritud multitoru(side) ol.oleval elektrivõrgu õhuliinil.
Projekteeritud perspektiivne kliendiliin(side) - õhuliin.
Taastatav haljasala - ca 459 m2.
Taastatav freespuru-, kruusa- või killustikkate - ca 4.5m2.
Suundpuurimise lõpu- ja alguskaevik.
MURUKÜLV
TAGASITÄIDE (Kt=0.98, Kf≥0.5 m/ööp) (märkus 3) LIIV (Kt=0.98, Kf>0.5 m/ööp) LIIV Kf>0.5 m/ööp OLEMASOLEV PINNAS Kt=0.95
15 cmSõelutud mineraalmuld kasvukihina
Haljasala taastamine
10 cm
Hoiatuslint
Projekt. multitoru
0, 7
0, 1
MÄRKUSED
1. Kõik tööd teostada vastavalt kehtivatele normatiividele ja seadustele.
2. Koordinaadid joonistel on L-EST süsteemis, kõrgused EH2000 süsteemis.
3. Projektis kasutatud peamiselt lahtist meetodit, v.a teisiti tähistatud kohtades (jälgida viiteid).
4. Haljasalal paigaldada kaabel 0,7m sügavusele, sõidutee 1m ning kõnnitee alla 1m sügavusele. Kitsaskohtades teostada kaevetööd käsitsi, vajadusel toestada teisi tehnovõrke.
5. Arvestada ol. olevate tehnorajatiste kaablikaitsevöönditega, milles kõikvõimalikud kaeve ja mullatööd ilma kaablivaldaja loata on keelatud. Tööde teostamine liinirajatiste kaitsevööndis võib toimuda kooskõlastatult vastava rajatise valdaja järelevalve üksusega.
6. Olemasolevad katted taastatakse samaväärseks kogu projekti ulatuses.
Hoiatuslint
Projekt. kaabel
PAEKILLUSTIK E>170 MPa fraktsioon 16/32 fraktsioon 32/63 kiilekillustiku fraktsioon 4/16-kulu 25 kg/m2
DREENKIHT LIIVAST (Kt=0.98, Kf>2.0 m/ööp) TAGASITÄIDE (Kt=0.98, Kf≥0.5 m/ööp) (märkus 3) LIIV (Kt=0.98, Kf>0.5 m/ööp) LIIV Kf>0.5 m/ööp OLEMASOLEV PINNAS Kt=0.95
12 cm
10 cm 15 cm
20 cm
10 cm
Tüüp 5 Kruusa taastamine
Ol.olev asfalt
PAEKILLUSTIK
0, 1
E201
E202
E203
Joonise nr
Projekti nr
Kuupäev
Mõõtkava
Projekteerija Hepta Group Energy OÜ Mäealuse 2/1 12618 TALLINN EESTI Tel. +372 5179698 [email protected]
Projekti nimetus
Joonise nimetus
Tellija
Staadium
30.08.2024
Enefit AS // Reg kood 16130213 Lelle tn 22, Kesklinna linnaosa, 11318 Tallinn, Harju maakond Tel +372 55522205 [email protected]
Asendiplaan (VT2103)
E202
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRU MAAKONNAS JA JÄRVA MAAKONNAS (P2024-08)
Kontrollija
Projektijuht
Projekteerija
S. Kulp
S. Kulp
M. Banko
24019 (VT2103)EP 1:1000
g225 65.174
g226 65.362
g227 65.397
g228 65.189
g229 65.085
g230 65.059
g231 65.404
g232 65.343
g233 65.345
g234 65.325
g235 65.231
g236 65.072
g237 64.952
g238 65.276
g239 64.983
g240 65.067
g241 65.082
g242 65.214
g243 65.354
g244 65.383
g245 65.456
g246 65.440
g247 65.287
g248 65.193
g249 65.236
g250 65.086
g251 65.460
g252 65.256
g253 65.295
g254 65.045
g255 65.407
g256 65.437
g257 65.472
g258 65.462
g259 65.443
g260 65.405
g261 64.804
g262 65.177
g263 65.273
g264 65.262
g265 65.279
g266 64.736
g267 65.463
g268 65.472
g269 65.472
g270 65.482
g271 65.453
g272 65.449
g273 64.723
g274 65.487
g275 65.500
g276 65.440
g277 64.800
g278 65.247
g279 65.332
g280 65.516
g281 65.535
g282 65.543
g283 65.523
g284 65.549
g285 64.693
g286 65.262
g287 65.397
g288 65.274
g289 64.709
g290 65.519
g291 65.472
g292 65.517
g293 65.493
g294 65.484
g295 65.476
g296 64.639
g297 64.588
g298 65.407
g299 65.424
g300 65.393
g301 65.175
g302 65.183
g303 64.518
g304 65.363
g305 65.371
g306 65.332
g307 65.250
g308 65.257
g309 65.191
g310 64.204
g311 64.813
g312 64.892
g313 64.598
g314 64.662
g315 64.571
g316 64.010
g317 64.469
g318 63.950
g319 64.054
g320 64.163
g321 65.117
g322 65.165
g323 65.144
g324 65.129
g325 65.142
g326 65.173
g327 64.472
g328 64.507
g329 65.120
g330 65.120
g331 65.115
g332 64.620
g333 64.564
g334 64.553
g335 64.627
g336 65.160 g337
65.107
g338 65.127
g339 65.088
g340 65.031
g341 65.031
g342 65.014
g343 64.742
g344 64.994
g345 65.020
g346 64.609
g347 64.460
g348 64.747
g349 64.681
g350 65.072
g351 65.049 g352 65.104
g353 65.122
g354 65.091
g355 64.732
g356 64.807
g357 65.217
g358 65.175
g359 65.138
g360 65.153
g361 65.192
g362 64.855
g363 64.768
g364 65.139
g365 65.159
g366 65.085
g367 65.077 g368 65.015
g369 64.904
g370 64.821
g371 64.980
g372 65.020
g373 64.930
g374 64.942
g375 65.050
g376 65.041
g377 64.939 g378 64.978
g379 65.036
g380 64.939
g381 64.935
g382 65.063
g383 65.018
g384 64.903
g385 64.909
g386 64.884
g387 64.920
g388 65.014
g389 64.894
g390 64.895
g391 64.722
g392 64.156
g393 64.859
g394 64.892
g395 65.050
g396 64.888
g397 64.835
g398 64.804
g399 64.857
g400 64.727
g401 64.931
g402 64.919
g403 64.938
g404 64.891
g405 64.945 g406
64.943
g407 65.045 g408
65.043
g409 65.143
g410 65.120
g411 65.124
g412 65.113
g413 65.042
g414 64.914
g415 65.089
g416 65.065
g417 65.034 8 . 60
g419 65.073
g420 65.034
g421 64.935
g422 65.049
g423 64.346
g424 64.377
g425 64.360
g426 64.306
g427 64.300
g428 64.323
g429 64.316
g430 64.304
g431 64.779
g432 64.536
g433 65.110
g434 65.874
g435 65.006
g436 65.119
g437 65.137
g438 64.680
g439 64.717
g440 64.794
g441 64.921
g442 64.759
g443 64.359
g444 64.533
g445 64.547
g446 64.555
g447 64.692
g448 64.606
g449 64.563
g450 64.537 g451 64.569
g452 64.638
g453 64.784
g454 64.752
g455 64.728
g456 65.325
g457 65.687
g458 65.440
g459 65.452
g460 65.448
g461 65.910
g462 65.834
g463 65.939
g464 65.955
g465 65.500
g466 65.587
g467 65.666
g468 65.645
g469 65.642
g470 65.238
g471 65.201
g472 65.283
g473 65.222
g474 65.333
g475 65.314
g476 65.309
g477 65.370
g478 65.406
g479 65.156
g480 64.817
g481 64.884
g482 65.333
g483 64.984
g484 65.545
g485 65.576
g486 65.610
g487 66.094
g488 65.926
g489 65.953
g490 65.811
g491 65.808
g492 65.914
g493 65.923
g494 65.866
g495 65.873
g496 66.017
g497 66.178
g498 66.204
g499 66.186
g500 66.260
g501 66.167
g502 66.108 g503 66.111
g504 66.063
g505 66.102
g506 65.961
g507 66.051
g508 65.937
g509 66.493
g510 65.871
g511 66.137
g512 66.630
g513 66.798
g514 67.360
g515 67.341
g516 67.607
g517 68.565
g518 68.190
g519 70.258
g520 69.270
g521 69.208
g673 64.913
g674 66.614
g675 64.620
g676 64.935
g677 65.256
g678 65.642
g679 65.398
g680 65.638
g681 65.789
g682 65.039
g683 65.046
g684 65.167
Teostada mastivahetus//Põhjus: gabariit Paigaldada 12m puitmast (10m maapinnast) koos toega.
Teostada mastivahetus//Põhjus: gabariit Paigaldada 12m puitmast (10m maapinnast) koos toega.
Vt Ristmevälja joonis nr.2
TINGMÄRGID, PROJKETEERITUD
Projekteeritud side vahejaotuspunkt (kapp mastil). Mõõdud 700x400x300mm.
Projekteeritud side jaotuspunkt (kapp maapinnal). Mõõdud ca1100x700x430mm, kõrgus maapinnast ca 1,3m.
Projekteeritud lõpp-punkt mastil (ühenduskarp mastil). Mõõdud 150x200mm.
Puhumiskaevik
Projekteeritud puitmast (kõrgus/tüüp väljatoodud viites)
Projekteeritud puitmasti toe komplekt (kõrgus/tüüp väljatoodud viites).
Projekteeritud maasisene multitoru(side) - DB-klassi (Direct Bury) märgistusega, min 1250N.
Projekteeritud perspektiivne kliendiliin(side) - maa sees.
Projekteeritud maasisene multitoru(side) kinnisel meetodil - puurumistoru PE D75, 1250N.
Projekteeritud multitoru(side) ol.oleval elektrivõrgu õhuliinil.
Projekteeritud perspektiivne kliendiliin(side) - õhuliin.
Taastatav haljasala - ca 459 m2.
Taastatav freespuru-, kruusa- või killustikkate - ca 4.5m2.
Suundpuurimise lõpu- ja alguskaevik.
MURUKÜLV
TAGASITÄIDE (Kt=0.98, Kf≥0.5 m/ööp) (märkus 3) LIIV (Kt=0.98, Kf>0.5 m/ööp) LIIV Kf>0.5 m/ööp OLEMASOLEV PINNAS Kt=0.95
15 cmSõelutud mineraalmuld kasvukihina
Haljasala taastamine
10 cm
Hoiatuslint
Projekt. multitoru
0, 7
0, 1
MÄRKUSED
1. Kõik tööd teostada vastavalt kehtivatele normatiividele ja seadustele.
2. Koordinaadid joonistel on L-EST süsteemis, kõrgused EH2000 süsteemis.
3. Projektis kasutatud peamiselt lahtist meetodit, v.a teisiti tähistatud kohtades (jälgida viiteid).
4. Haljasalal paigaldada kaabel 0,7m sügavusele, sõidutee 1m ning kõnnitee alla 1m sügavusele. Kitsaskohtades teostada kaevetööd käsitsi, vajadusel toestada teisi tehnovõrke.
5. Arvestada ol. olevate tehnorajatiste kaablikaitsevöönditega, milles kõikvõimalikud kaeve ja mullatööd ilma kaablivaldaja loata on keelatud. Tööde teostamine liinirajatiste kaitsevööndis võib toimuda kooskõlastatult vastava rajatise valdaja järelevalve üksusega.
6. Olemasolevad katted taastatakse samaväärseks kogu projekti ulatuses.
Hoiatuslint
Projekt. kaabel
PAEKILLUSTIK E>170 MPa fraktsioon 16/32 fraktsioon 32/63 kiilekillustiku fraktsioon 4/16-kulu 25 kg/m2
DREENKIHT LIIVAST (Kt=0.98, Kf>2.0 m/ööp) TAGASITÄIDE (Kt=0.98, Kf≥0.5 m/ööp) (märkus 3) LIIV (Kt=0.98, Kf>0.5 m/ööp) LIIV Kf>0.5 m/ööp OLEMASOLEV PINNAS Kt=0.95
12 cm
10 cm 15 cm
20 cm
10 cm
Tüüp 5 Kruusa taastamine
Ol.olev asfalt
PAEKILLUSTIK
0, 1
E201
E202
E203
Joonise nr
Projekti nr
Kuupäev
Mõõtkava
Projekteerija Hepta Group Energy OÜ Mäealuse 2/1 12618 TALLINN EESTI Tel. +372 5179698 [email protected]
Projekti nimetus
Joonise nimetus
Tellija
Staadium
30.08.2024
Enefit AS // Reg kood 16130213 Lelle tn 22, Kesklinna linnaosa, 11318 Tallinn, Harju maakond Tel +372 55522205 [email protected]
Asendiplaan (VT2103)
E203
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRU MAAKONNAS JA JÄRVA MAAKONNAS (P2024-08)
Kontrollija
Projektijuht
Projekteerija
S. Kulp
S. Kulp
M. Banko
24019 (VT2103)EP 1:1000
0 1 2
4 5 6 7 8 9
3
10 11
Ristmevälja joonis Nr. 1
Joonise nr
Projekti nr
Kuupäev
Mõõtkava
Projekteerija Hepta Group Energy OÜ Mäealuse 2/1 12618 TALLINN EESTI Tel. +372 5179698 [email protected]
Projekti nimetus
Joonise nimetus
Tellija
Staadium
19.08.2024
Enefit AS // Reg kood 16130213 Lelle tn 22, Kesklinna linnaosa, 11318 Tallinn, Harju maakond Tel +372 55522205 [email protected]
Ristmevälja joonis nr.1
E101
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRU MAAKONNAS JA JÄRVA MAAKONNAS (P2024-09)
Kontrollija
Projektijuht
Projekteerija
S. Kulp
S. Kulp
M. Banko
24019 (VT2103)EP 1:150
D
C
B
A
1 2 3 4 5 6 7 8
F
E
D
C
B
A
1 2 3 4 5 6 7 8
F
E
0 1 2
4 5 6 7 8 9
3
10 11
Ristmevälja joonis Nr. 2
Joonise nr
Projekti nr
Kuupäev
Mõõtkava
Projekteerija Hepta Group Energy OÜ Mäealuse 2/1 12618 TALLINN EESTI Tel. +372 5179698 [email protected]
Projekti nimetus
Joonise nimetus
Tellija
Staadium
19.08.2024
Enefit AS // Reg kood 16130213 Lelle tn 22, Kesklinna linnaosa, 11318 Tallinn, Harju maakond Tel +372 55522205 [email protected]
Ristmevälja joonis nr.2
E101
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRU MAAKONNAS JA JÄRVA MAAKONNAS (P2024-09)
Kontrollija
Projektijuht
Projekteerija
S. Kulp
S. Kulp
M. Banko
24019 (VT2103)EP 1:150
D
C
B
A
1 2 3 4 5 6 7 8
F
E
D
C
B
A
1 2 3 4 5 6 7 8
F
E
Tellija:
Enefit AS
Lelle tn 22, Kesklinna linnaosa, 11318 Tallinn, Harju maakond
Dokumendi tüüp:
Eelprojekt
Kuupäev:
21.08.2024
Projekti nr:
24019
Objekti aadress:
Röa küla, Türi vald, Järva maakond
SIDEVÕRGU
PROJEKTEERIMINE IDA-
VIRUMAAKONNAS JA JÄRVA
MAAKONNAS (P2024-08)
VT2103
EELPROJEKT
www.hepta.ee
Hepta Group Energy OÜ
Teaduspargi 6/1
12618 Tallinn
T +372 53 42 6358
MTR TEL002175
12502103
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRUMAAKONNAS JA JÄRVA MAAKONNAS (P2024-08)
VT2103
Side välisvõrk
Projekti nr. 24019 Projekti koostaja: Hepta Group Energy OÜ
Staadium: Eelprojekt Vastutav spetsialist: Sander Kulp
Versioon: v01 Projekteerija: Marek Banko
Dokument: 2401_EP_ENV-4-01_Seletuskiri-VT2103 Kuupäev: 21.08.2024
2 / 11
Versioon 01
Projekteerija: Marek Banko
Projektijuht: Sander Kulp Diplomeeritud elektriinsener - tase 7 (Kutsetunnistus 187042)
SISUKORD SIDEVÕRKUDE LAHENDUSED ............................................................................ 3
1.1. Standardid .......................................................................................................... 3 1.2. Üldosa ................................................................................................................ 3 1.3. Trassivalik ........................................................................................................... 4 1.4. Maasisese multitoru paigaldus ............................................................................... 4 1.5. Sideõhuliini paigaldus ........................................................................................... 4 1.6. Sideliitumine ....................................................................................................... 5 1.7. Nõuded olemasolevate kommunikatsioonide kaitsmiseks kaevetöödel ......................... 5 1.8. Täiendav info ....................................................................................................... 6 1.9. Multitorustik ........................................................................................................ 7 1.10. AS Gaasivõrk ....................................................................................................... 8
TAIMEDE KAITSE ............................................................................................... 8
2.1. Soovituslikud hooldusvõtted .................................................................................. 8 2.2. Puude kaitsmine .................................................................................................. 9 2.3. Puujuurte kaitsmine ............................................................................................. 9
EHITAMINE KAITSEALADES .............................................................................. 9
3.1. Keskkonnakaitse .................................................................................................. 9 3.2. Muinsuskaitse .......................................................... Error! Bookmark not defined.
PUUTUMUSED RIIGITEEGA .............................................................................. 10
4.1. Ristumine riigimaanteega õhuliiniga ........................... Error! Bookmark not defined. 4.2. Ristumine riigimaanteega maa-liiniga ................................................................... 10 4.3. Kulgemine riigimaanteel maa-liiniga ..................................................................... 10 4.4. Kaablipaigaldus nõuded riigiteede katastris ........................................................... 10
JOONISED ....................................................................................................... 10
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRUMAAKONNAS JA JÄRVA MAAKONNAS (P2024-08)
VT2103
Side välisvõrk
Projekti nr. 24019 Projekti koostaja: Hepta Group Energy OÜ
Staadium: Eelprojekt Vastutav spetsialist: Sander Kulp
Versioon: v01 Projekteerija: Marek Banko
Dokument: 2401_EP_ENV-4-01_Seletuskiri-VT2103 Kuupäev: 21.08.2024
3 / 11
SIDEVÕRKUDE LAHENDUSED
1.1. Standardid
Käesoleva projekti koostamisel on lähtutud järgnevatest nõutest ja standarditest:
• EVS 932:2017 Ehitusprojekt.
• ELA SA elektroonilise side alased tehnilised tingimused nr: TLVT24007
• EVS 843:2016 Linnatänavad
• EVS-EN 50341:1:2013 Elektriõhuliinid vahelduvpingega üle 1 kV. Osa 1: Üldnõuded.
Ühised eeskirjad
• EVS-EN 50341:2:2018 Elektriõhuliinid vahelduvpingega üle 1 kV. Osa 2-20: Eesti
siseriiklikud erinõuded
• EVS-EN 61936-1:2010/A1:2014 Tugevvoolupaigaldised nimivahelduvpingega üle 1 kV.
Osa 1: Üldnõuded
1.2. Üldosa
Käesolevas projektis on lahendatud sidevõrgu projekt Järva maakonnas projekti viitega VT2102
piirkond.
Eelprojekti põhilisteks eesmärkideks on:
• Projekteerida ehitatavale passiivsele elektroonilisele side juurdepääsivõrgule
multitorustiku trass, sidekaevud, vahejaotus- ja lõpp-punktide asukohad koos
kliendiliinidega;
• Ühendada kõik lähteandmetes toodud aadressid operaatorineutraalse sidevõrguga, mis
omakorda ühendatakse baasvõrguga;
• Kontrollida nõuetekohaseid gabariite projekteeritavale multitorustikule;
• Kontrollida olemasolevate mastide seisukorda, kuhu sideliin rajatakse.
Projekteerimistöö aluseks on Enefit AS poolt väljastatud projekteerimisülesanne (Lähteülesanne
VT2102) ja MTÜ Eesti Andmesidevõrk tehnilised tingimused.
Nimetatud dokumentidega tuleb arvestada ka tööprojekti koostamisel ja ehitustööde teostamisel.
Käesolev projekt ei sisalda ehitustööde organiseerimise osa. Ehitustööde teostaja lahendab tööde
teostamise tehnoloogilise järjekorra koos sellega kaasnevate töödega, sh ehitusaegsete ajutiste
tehnovõrkude rajamisega või ümberehitustega. Lahendused ümberehitustele kuuluvad ehituse
töövõttu.
Ehitajal on kohustus enne hinnapakkumise tegemist tutvuda olukorraga kohapeal. Enne tööde
algust tutvuda kooskõlastus tingimustega ning arvestada nende nõudmistega. Vähemalt kolm
päeva enne liiniehitustööde algust tuleb võtta ühendust kinnistute valdajatega ning teavitada neid
tööde teostamisest nende maaüksusel. Tööde alustamisel tuleb informeerida tehnovõrkude
valdajaid ja täpsustada tehnovõrkude täpne asukoht.
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRUMAAKONNAS JA JÄRVA MAAKONNAS (P2024-08)
VT2103
Side välisvõrk
Projekti nr. 24019 Projekti koostaja: Hepta Group Energy OÜ
Staadium: Eelprojekt Vastutav spetsialist: Sander Kulp
Versioon: v01 Projekteerija: Marek Banko
Dokument: 2401_EP_ENV-4-01_Seletuskiri-VT2103 Kuupäev: 21.08.2024
4 / 11
Projekti koostamisel on kasutatud järgmisi materjale:
• Geodeetilise täpsusega määratud olemasolevate mastide asukohad ning geodeetiline
alusplaan, valitud kohtades;
• Maa-ameti avaandmetena kätte saadavad katastriüksuste, teede ning hoonete piiri
andmed;
• Enefit AS geoinfromatiivse veebikeskkonna „Trimble“ väljavõtted;
• MTÜ Eesti Andmesidevõrk poolt väljastatud tehnilised tingimused.
1.3. Trassivalik
Multitoru trassi projekteerimisel on võimalikult suurel määral kasutatud olemasolevaid Elektrilevi
OÜ ja vallale kuuluvaid maste. Sellisel juhul on võimalik uus sidevõrk paigaldada olemasolevate
tehnovõrkudega samasse kaitsevööndisse. Kohtades, kus selline võimalus puudub on uus sidetrass
projekteeritud maakaabelliinina või õhuliinina. Baasvõrgu ühenduskoht on ette määratud
lähteülesandes.
1.4. Maasisese multitoru paigaldus
Maasisene multitoru paigaldada pinnasesse vähemalt 0,7 m sügavusele liivapadjas kaitsetorusse.
Teemaal paigaldatakse multitoru minimaalselt 1 m sügavusele ning ristumisel teetruupidega
minimaalselt 1,0m vertikaalvahega truubi alt. Ristumisel kommunikatsioonidega paigaldada
projekteeritavad tehnorajatised plasttorus ja juhinduda normide kohastest püst- ja
horisontaalvahekaugustest ning kooskõlastustes toodud tingimustest. Multitoru montaažil jälgida
multitoru tootja poolt lubatud painderaadiusi ja tõmbejõudusid. Ristuvale allmaarajatisele lähemal
kui 1 m kaevata äärmise ettevaatlikkusega ning vajadusel käsitsi (vt. kooskõlastuste tingimusi).
Mehhaniseeritud kaevamine on lubatav ainult maa-aluste rajatiste valdajate loal, seejuures enne
kontrollides, kas maa sees ei leidu plaanidele kandmata rajatisi. Ristumistel allmaarajatistega tuleb
multitoru paigaldussügavus täpsustada kohapeal ehituse käigus, tehes käsitsi kaevates kindlaks
nende täpse asukoha ja suuna. Pärast kaevetööde ja multitoru paigaldustööde lõppu tuleb kaevis
täita tihendatud pinnasega (pinnase tihendamise koefitsient sõidu- ja kõnniteedel on 0,98). Samuti
taastada teekatted ja haljastus endisele või maapinna taastamise joonisel ettenähtud kujule.
1.5. Sideõhuliini paigaldus
Sideõhuliin paigaldada olemasolevatele mastidele olemasolevast elektriliinist alla poole. Isoleeritud
elektrikaabli korral paigaldada sideliin paralleelselt elektrikaabliga teisele poole masti. Seda juhul,
kui olukord seda võimaldab ja nõutud gabariit elektriliiniga välja annab. Madalpingeõhu-kaabli ja
sideliinide kinnituskohtade vahe mastil peab olema vähemalt 0,3m. Vähim vertikaalvahemik
madalpinge õhukaabli ristumisel sideliiniga peab visangus olema 0,3m. Keskpinge õhukaabli puhul
on see 0,5m ning isoleerimata faasijuhtmest 1,5m.
Sideõhuliini paigaldusel tuleb arvestada standardis EVS-EN 50341-2-20:2018 esitatud
õhkvahemikega sideliini ja maa vahel.
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRUMAAKONNAS JA JÄRVA MAAKONNAS (P2024-08)
VT2103
Side välisvõrk
Projekti nr. 24019 Projekti koostaja: Hepta Group Energy OÜ
Staadium: Eelprojekt Vastutav spetsialist: Sander Kulp
Versioon: v01 Projekteerija: Marek Banko
Dokument: 2401_EP_ENV-4-01_Seletuskiri-VT2103 Kuupäev: 21.08.2024
5 / 11
Tabel. 2 Nõutud gabariidid sideõhuliini ja maa vahel
Maani Sõiduteeni Kergliiklusteeni Suuregabariidiliste töömasinate töötamisaladel
4,0m 7,0m* 4,5m 5,0m
*Teeomaniku kooskõlastamisel võib vahekaugust vähendada 1,5m võrra
1.6. Sideliitumine
Tehtavad tööd: Passiivse elektroonilise side juurdepääsuvõrgu rajamine olemasolevast ELA SA
kaevust 085K75>085M35
1.7. Nõuded olemasolevate kommunikatsioonide kaitsmiseks kaevetöödel
Projekti koostamisel on eeldatud, et geodeetiliste tööde aruandes esitatud informatsioon
olemasolevate insenertehniliste kommunikatsioonide asukoha kohta on tõene.
Kõik ehitustööd tuleb läbi viia vastavuses Eesti Vabariigis kehtivate seaduste ja nõuetega,
projektlahendusest tulenevate teiste normide ja standarditega ning üldkehtivatele põhimõtetele ja
arusaamadele kvaliteetsest tööst.
Töövõtja peab enne tööde algust veenduma, et ta ei kahjustaks ühtegi olemasolevat rajatist ja
kommunikatsiooni. Enne töödega alustamist tuleb Töövõtjal koostöös olemasolevate maa-aluste
rajatiste valdajatega rajatiste asukohad ja sügavused täpsustada ja tähistada, et vältida
ehitustööde käigus tekkida võivat kahju.
Rajatiste, kommunikatsioonide rikkumise korral peab Töövõtja heastama ja taastama olemasoleva
olukorra ja katma kõik sellega seotud kulutused ja ametkondade nõuded.
Töövõtja ei tohi demonteerida olemasolevaid süsteeme, rajatisi ja seadmeid enne kui on
korraldatud ajutised ühendused või uued süsteemid on võimalik töösse rakendada, et tagada
vajalikud teenused tarbijatele, vesi, kanalisatsioon, sadevesi, elekter, telefon, teed, tänavad jms.
Töövõtjal tuleb rajatiste ja kommunikatsioonide vahetus läheduses töötamisel täita valdajate poolt
esitatavaid nõudeid. Tööd elektri-ja siderajatiste kaitsevööndis tuleb teostada kooskõlastatult
omanikega ja siderajatiste korral.
Olemasolevate kaablite, õhuliinide, jm vahetus läheduses tuleb kaevetöid teha nende ehitiste
omaniku juhendite kohaselt. Siderajatiste kaitsetsoonis võib töid teostada volitatud esindaja
kirjaliku tööloa alusel.
Kaevetööde teostamisel olemasolevate elektri-ja sideliinirajatiste vahetus läheduses tuleb rajatised
toestada ja kaitsta nii, et need ei liiguks ehitustööde jooksul või neid ei vigastataks.. Kaablite
vahetus läheduses kaevata käsitsi.
Valgustusposti paiknemisel tehnovõrkude vahetus läheduses, tuleb tehnovõrgud käsitsi lahti
kaevata ja tõsta valgustusposti jalandi kõrvale, vigastamata kaablit.
Töövõtja peab kindlustama kaeviku seinad, vältimaks kaeviku seinte varisemist koos vahetus
läheduses oleva sidekaabliga. Kaeviku toestus peab ära hoidma külgnevate pinnaste,
vundamentide, sidekaabli, rajatiste ja muu omandi häirimise või kokkuvarisemise.
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRUMAAKONNAS JA JÄRVA MAAKONNAS (P2024-08)
VT2103
Side välisvõrk
Projekti nr. 24019 Projekti koostaja: Hepta Group Energy OÜ
Staadium: Eelprojekt Vastutav spetsialist: Sander Kulp
Versioon: v01 Projekteerija: Marek Banko
Dokument: 2401_EP_ENV-4-01_Seletuskiri-VT2103 Kuupäev: 21.08.2024
6 / 11
Vajaduse korral tuleb olemasolev sidekaabel (nii paralleelselt kulgev kui ka ristuv kaabel) kaitsta
ja üles riputada. Eriti kitsastes tingimustes on soovitav kaevetööd läbi viia lõikude kaupa.
Töövõtja peab pinnase tihendamise kaevikute tagasitäitmisel läbi viima selliselt, et ei kahjustataks
torustikku ja võimalikke kaableid ning saavutatakse nõutava pinnase taastamine.
Tagasitäite tegemisel tuleb jälgida, et materjal ei sisaldaks näiteks suuri kive, mis võivad oma
kukkumisega mõjutada nii torustikku kui näiteks erinevaid kaableid (elekter, side).
Lahtikaevatud kaablitel (nii side kui ka elekter) ja torustikel (vesi jm) tuleb alus hoolikalt tihendada,
et kaablid ei jääks pingesse ning tagasitäide tuleb teha hoolikalt, s.t. tagasitäite materjal ei tohi
kaableid rikkuda. Suurimate pinnaseosiste läbimõõt ei tohi ületada 2/3 tihendatava kihi paksusest.
Torustike rajamisel kinnisel meetodil (puurimistööd, rammimine) tuleb määrata enne tööde algust
olemasolevate, ristuvate kaablite sügavus (määrata surfimise teel omaniku juuresolekul).
Olemasolevate õhuliinide all töötamisel on keelatud kasutada kõrgeid mehhanisme. Töövõtja peab
valima töödeks sobivad mehhanismid, mis tagavad min vahekauguse 5 m.
Töövõtja peab kõik kaeviku vahetus läheduses olevad õhuliini postid toestama ning tagama, et
post ei liiguks, kuna liinid on jäigad. Vajaduse korral tuleb ehitustööde ajaks olemasolevate postide
toed ja tõmmitsad teisaldada, seda aga pärast posti toestamist.
Pärast tööde lõpetamist tuleb taastada ehituseelne olukord, kontrollida, et postid oleks
vertikaalsed, et õhuliinid oleks ühtlaselt pingutatud. Tõmmitsate tagasipanek peab olema tehtud
vastavat litsentsi omava firma poolt.
Rajatavate torustike ristumisel olemasolevate soojatorustikega tuleb täita Tellija nõuded.
Kõik ehitustööde käigus rajatavate torustikega ristuvad olemasolevad kommunikatsioonid tuleb
vigastamise korral taastada ja kanda teostusjoonistele.
1.8. Täiendav info
Käes oleva projekti raames on ette näidatud jaotuskappide, vahejaotuskappide, lõpp punktide,
uute mastide ning mastitugede asukohad. Kappide asukohad on projekteeritud võimalikult
ligipääsetavatesse kohtadesse sidevõrgu kõrvale. Vahejaotuskapid paigaldatakse mastidele ning
jaotuskapid paigaldatakse maasse. Täpne lahendus määratakse tööprojekti raames.
Vahejaotuskappide ja jaotuskappide asukohtade määramisel on arvestatud klientide arvuga
piirkonnas ning jaotuskapid jaotatud trassile nii, et oleks võimalik tekitada sideühendus ka
perspektiivsete klientidega.
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRUMAAKONNAS JA JÄRVA MAAKONNAS (P2024-08)
VT2103
Side välisvõrk
Projekti nr. 24019 Projekti koostaja: Hepta Group Energy OÜ
Staadium: Eelprojekt Vastutav spetsialist: Sander Kulp
Versioon: v01 Projekteerija: Marek Banko
Dokument: 2401_EP_ENV-4-01_Seletuskiri-VT2103 Kuupäev: 21.08.2024
7 / 11
Pilt 1. Vahejaotuskapp (vasak) ja peajaotuskapp (parem)
Peajaotuskapp on joonistel tähistatud Cxxxx tingmärgiga ning vahejaotuskapp CxxxxDPxx
tingmärgiga.
Lõpp punkt on projekteeritud igasse masti, millel on ühendus kliendiga. Ühest lõpp punktist on
võimalik viia kliendiliin kuni neljale erinevale majapidamisele. Lõpp punktide asukoha määramisel
on arvestatud ka perspektiivsete ühendustega. Lõpp punkti otsatuskarp, milles alamkliendiliin
ühendatakse läbi pistikliite, paigaldatakse masti kõrgemasse otsa sideliini kõrvale.
Lisaks kappidele ja lõpp punktidele on projektiga ära määratud olemasolevate mastide vahetuse
vajadus ning mastide lisatugede paigaldamise vajadus. Mastide vahetuse vajadus oleneb masti
seisukorrast või juhtme gabariidist. Uued mastid peavad olema puidust tüvega ning sobima
keskkonda. Mastitüüp või mastitoe tüüp määratakse tööprojektis.
1.9. Multitorustik
Magistraalliin paigaldatakse terve projekti ulatuses multitorusse, mis võimaldab tulevikus uusi si-
dekaableid paigaldada puhumismeetodil. Multitorusse asuvad mikrotorud ning ühele lõpp punktile
tuleb reserveerida üks mikrotoru. Mitme paralleelselt kulgeva multitoru asemel eelistada ühte
suuremat mikrotorude arvuga multitoru. Mikrotorusüsteem paigaldada vastavalt tootja poolsetele
juhistele jälgides paigaldustemperatuure, kasutades ettenähtud töövahendeid ja -meetodeid,
järgides nii paigaldusaegseid kui ka puhumiseks sobivaid painderaadiuseid. Mikrotorusüsteem peab
olema korralikult dokumenteeritud ja mikrotorude peavad olema standardi kohaselt tuvastatavad
ka hilisemaks kaablite puhumiseks. Värvikood peab olema nähtav ja torustik peab olema
standardsete meetoditega puhumistööks ligipääsetav. Vältimaks vee sattumist mikrotorusse tuleb
tagada kõigi ühenduste ja lõppude hermeetilisus.
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRUMAAKONNAS JA JÄRVA MAAKONNAS (P2024-08)
VT2103
Side välisvõrk
Projekti nr. 24019 Projekti koostaja: Hepta Group Energy OÜ
Staadium: Eelprojekt Vastutav spetsialist: Sander Kulp
Versioon: v01 Projekteerija: Marek Banko
Dokument: 2401_EP_ENV-4-01_Seletuskiri-VT2103 Kuupäev: 21.08.2024
8 / 11
Kõik pinnasesse paigaldatavad multitorud vastavad tugevusastme kaitsele 1250N.
1.10. AS Gaasivõrk
• AS-i Gaasivõrk gaasipaigaldise kaitsevööndis kaevetööde teostamiseks on vajalik eelnevalt
taotleda AS-ilt Gaasivõrk kaitsevööndis tegutsemise luba ning kutsuda objektile kohale AS-
i Gaasivõrk järelevalve.
• Ehitamisel tuleb kasutada mehhanisme, töövõtteid ja –meetodeid, mis välistavad
gaasipaigaldise ja sellega seotud rajatiste kahjustamist. Kõigi ehitusperioodil töömaal
tekkinud vigastuste likvideerimine toimub ehitustööde teostaja ja vastutaja kulul.
• Gaasipaigaldise ja/või katoodkaitsekaabli lahtikaevamisel ja täpse asukoha tuvastamisel
tuleb kaitsevööndis kaevata labidaga.
• Kui ehitustööde käigus muutub pinnase tasapind gaasivõrgu armatuuri kaitsekapede ja
gaasireguleerkappide ümbruses, siis tuleb gaasivõrgu armatuuri kaitsekaped ja
gaasireguleerkapid tõsta õigele tasapinnale. Selleks tellida täiendavad tööd AS Gaasivõrk
poolt aktsepteeritud ettevõtte käest.
• Peale tööde teostamist peavad AS Gaasivõrk gaasitorud jääma nõuetekohasele sügavusele.
Näha ette kõik meetmed olemasolevate AS Gaasivõrk gaasitorude kaitseks tagamaks
nende säilivus ehitustööde käigus, tagada nõuetekohased sügavused. Tagada trasside
paiknemisel vastavus EVS 843 standardi nõuetega. Tegevuse korraldamisel gaasitrassi
kaitsevööndis juhinduda ehitusseadustiku § 70 ja § 76 nõuetest ning Majandus- ja
taristuministri määrusest nr 73.
• Tööde teostamine gaasipaigaldise kaitsevööndis võib toimuda kooskõlastatult AS-I
Gaasivõrk järelevalvega ja ainult töö- või põhiprojekti alusel.
• Lahti kaevatud gaasitorustik on vajalik enne kinni ajamist ette näidata AS Gaasivõrk
järelevalve esindajale.
• Peale pinnase taastamise töid peavad olema gaasikaped terve ja nähtavad ning need tuleb
näidata ette AS Gaasivõrk järelevalvele.
• Ehitaja peab lisaks arvestama projektile antud seisukoha märkustega.
TAIMEDE KAITSE
2.1. Soovituslikud hooldusvõtted
Kõikidele puudele ning põõsastele ja hekkidele teostada hoolduslõikus. Soovituslikud hooldusvõtted
aitavad säästa olemasolevat loodust, haljastusväärtust ja taastushaljastus väärtust. Teostataval
hoolduslõikusel tuleb jälgida võra vähendamise mahtu, mis ei tohiks ületada 15%. Vajaminev
hoolduslõikus on tuleb läbi viia erialaspetsialisti poolt (vähemalt arborist II kutsetunnistusele
vastav kvalifikatsioon). Vastavad erialaspetsialistid on saadavad näiteks Eesti Arboristide Ühingu
kaudu. Ehitustöödel tuleb vältida puukoorte lõhkumist. Kaevetöödel ei tohi juuri läbi raiuda või
lõhki rebida, vaid juured tuleb eemaldada hargnemiskohtadelt. Puujuurte ümbertõstmisel mitte
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRUMAAKONNAS JA JÄRVA MAAKONNAS (P2024-08)
VT2103
Side välisvõrk
Projekti nr. 24019 Projekti koostaja: Hepta Group Energy OÜ
Staadium: Eelprojekt Vastutav spetsialist: Sander Kulp
Versioon: v01 Projekteerija: Marek Banko
Dokument: 2401_EP_ENV-4-01_Seletuskiri-VT2103 Kuupäev: 21.08.2024
9 / 11
murda juuri kokku. Juurekaelasid ei tohi matta ka ehituse ajaks. Igasugune puuvõrade või põõsaste
kujundamine ja puittaimestiku raie kaitsealuses pargis tuleb enne ehitustööde alustamist
kooskõlastada Keskkonnaametiga. Kaevetöödest üle jäänud kaevise (va muld) laotamine pargi
territooriumile on keelatud. Ehitustööde planeerimisel tuleb arvestada lindude pesitsusperioodiga
(01.04 kuni 31.07)
2.2. Puude kaitsmine
Kaevetöö tegemisel võra projektsioonialal paigaldatakse puudele tüvekaitsed. Ehitustöödel
väärtuslike ja eriti väärtuslike puude- või taimerühma kaitsmiseks kasutada tarastamist 1,5 m
kõrguse taraga järgmiselt, et puude võrad jäävad tara sisse. Kui kaitstavad taimed asuvad
ehitusplatsi ääres, võib tarastada ümber haljastu, või ehitada tara ainult ehitusplatsi poolsele
küljele. Tarastatud ala ei tohi kasutada materjali laoplatsina.
Puutüve ümber tehakse püstplankudest kinnitatud kaitse, kus tüve ja plankude vahele asetatakse
pehme polster. Kui töötingimused puu all ei ole tööd võimaldavad, võib enne töö alustamist
kokkuleppel haljastusspetsialistiga kärpida puu alumisi oksi. Lõige tuleb teostada kas tüve või
lähima jämedama oksa vastast, jätmata tüügast ja kahjustamata oksakraed. Töö õppedes
eemaldatakse tööaegsed kaitseehitised.
2.3. Puujuurte kaitsmine
Kaevetööd lähemal, kui 2m puutüvest teostatakse käsitsi ning vajadusel kasutada Airspade
kaevamise meetodit. Suurte puude juuri lõigatakse võimalikult vähe. Üle 40mm läbimõõduga
juurte läbilõikamine kooskõlastada haljastusspetsialistiga. Lõige teha võimalikult väikese
lõikepinnaga, kaldega allapoole tüve suunas. Katki rebitud juureotsad ristisuunaliselt ära lõigata.
Puujuurte kuivamise vältimiseks kastetakse lahtises süvendis paljandunud puujuuri ning kaetakse
seejärel savika mulla ja geotekstiiliga(aurumise vältimiseks). Hilisem kastmine vähemalt 1x
nädalas põhjalikult. Pikemalt lahti olevas süvendis kaitstakse juuri juurevõrguga(puupostidele
toetatud jäik võrk),millele toetub geotekstiil. Vajadusel asetatakse juurestiku ja piirde vahele
kastmistoru. Puujuurte külmumise vältimiseks on paljandunud murdunud juurte katmine vajalik
temperatuuri langemisel alates –10 0C. Kaetakse juurevõrgu, geotekstiili ja kuivast poorsest
materjalist külmaisolatsiooniga, (penoplast, kivivill vms ehitussoojustusmaterjal). Kergesti
variseva pinnase puhul, kus puujuured võivad kahjustuda pinnase nihkumise tagajärjel, rajatakse
tugiseinad puujuurte kaitsmiseks. Töötamisel säilitatavate puude all kaitstakse juurestiku ala
maapinnale laotatud õhulise liivakihiga, mille peale pannakse killustik. Liivakihi võib asendada
geotekstiiliga.
EHITAMINE KAITSEALADES
3.1. Keskkonnakaitse
Ehitustööd peab tegema keskkonnasäästvalt vastavalt kehtivale kaitse-eeskirjale.
Ehitamisel kasutatavad masinad ja mehhanismid ei tohi lekkida õli, kütust ega muid kemikaale.
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRUMAAKONNAS JA JÄRVA MAAKONNAS (P2024-08)
VT2103
Side välisvõrk
Projekti nr. 24019 Projekti koostaja: Hepta Group Energy OÜ
Staadium: Eelprojekt Vastutav spetsialist: Sander Kulp
Versioon: v01 Projekteerija: Marek Banko
Dokument: 2401_EP_ENV-4-01_Seletuskiri-VT2103 Kuupäev: 21.08.2024
10 / 11
Pärast ehitamist tuleb ümbrus korrastada ja ehituspraht käidelda vastavalt kehtivale
seadusandlusele ning kooskõlas Rakvere linna heakorraeeskirja ja jäätmehoolduseeskirjaga.
Demonteeritavad konsoolid ja valgusti utiliseerida nõuetekohaselt.
Ehitusmaterjale ei tohi põletada.
PUUTUMUSED RIIGITEEGA
4.1. Ristumine riigimaanteega maa-liiniga
1. 15129 Paide-Roovere-Kuimetsa tee 93701:005:0084
4.2. Kulgemine riigimaanteel maa-liiniga
2. 15129 Paide-Roovere-Kuimetsa tee 93701:005:0084
Kaablipaigaldus nõuded riigiteede katastris
1. Kaabli paigaldamise sügavus teemaal minimaalselt 1,0 m ümbritsevast maapinnast.
2. Lähemal kui 1,0 m muldkeha nõlvale kaabli paigaldamise minimaalne sügavus 1,2 m
ümbritsevast maapinnast. Kaabel paigaldada 750N kaitsetorusse.
3. Ristisuunalised läbiminekud olemasolevast teest teostada kinnisel meetodil. Minimaalne
sügavus 1,5 m ümbritsevast maapinnast (põhimaantee või arendushuviga tee katte ja
mulde alla min. 2,2m), süvendi korral teekatte pinnast. Kaabel paigaldada 1250N
kaitsetorusse kogu teemaa laiuses.
4. Kraavidest ristisuunalisel läbiminekul kaabli minimaalne sügavus kraavi põhjast 1,0m.
Kaabel paigaldada metallist või 750N kaitsetorusse vastavalt kehtivatele standarditele.
5. Teega paralleelselt kulgevaid kaableid kraavidesse (põhi, nõlvad) mitte planeerida. Teiste
tehniliste võimaluste puudumisel paigaldada kaablid kraavi põhja 750N kaitsetorusse min
1,0 m sügavusele. Soovitatavalt teostada töö suundpuurimisega. Kaablipaigaldamise jälg
tuleb tihendada, põhi ja nõlvad taastada vastavalt endisele olukorrale.
6. Ristumisel riigiteega, peab õhuliini kõrgus teest olema min. 7 meetrit, k.a ühisriputusega
sideliinide puhul. (Tulenevalt standardist EVS-EN 50341-2-20:2018). Kergliiklusteede
puhul 4,5m pinnast.
JOONISED
TÜÜP KOOD NIMI
Ristmevälja sõlm-joonis E201- E202
24019_EP_ENV-1-02_Ristmevälja_sõlm-joonised-VT2103
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRUMAAKONNAS JA JÄRVA MAAKONNAS (P2024-08)
VT2103
Side välisvõrk
Projekti nr. 24019 Projekti koostaja: Hepta Group Energy OÜ
Staadium: Eelprojekt Vastutav spetsialist: Sander Kulp
Versioon: v01 Projekteerija: Marek Banko
Dokument: 2401_EP_ENV-4-01_Seletuskiri-VT2103 Kuupäev: 21.08.2024
11 / 11
Asendiplaan E200 24019_EP_ENV-4-01_Asendiplaan-VT2103
FO R
M A
A T
A 4
2 10
x 2
97 m
m
Joonise nr
Projekti nr
Kuupäev
Mõõtkava
Projekteerija Hepta Group Energy OÜ Mäealuse 2/1 12618 TALLINN EESTI Tel. +372 5179698 [email protected]
Projekti nimetus
Joonise nimetus
Tellija
Staadium
05.09.2024
Enefit Connect OÜ, Veskiposti tn 2 Tallinn Harjumaa 10138 Tel +372 777 404, [email protected]
Liitumise sideskeem, Aseri alevik VT2103
E101
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRU MAAKONNAS JA JÄRVA MAAKONNAS (P2024-08)
Kontrollija
Projektijuht
Projekteerija
S. Kulp
S. Kulp
M. Banko
24019EP -
g547
65.564
g548
65.561
g549
65.370
g550
65.435
g551
65.480
g552
65.508
g553
65.507
g554
65.501
g555
65.213
g556
65.149
HTO_108408
65.540 g557
65.540
g558
65.157
g559
65.226
g560
65.270
g561
65.303
g562
65.536
g563
65.555
g564
65.368
g565
65.352
g566
65.421
g567
65.360
g568
65.477
g569
65.551
g570
65.482
g571
65.434
TINGMÄRGID
Projekteeritud sideliin maasisene Katastripiir
Kasutusõiguse ala
FO R
M A
A T
A 3
2 97
x 4
20 m
m
Isikliku kasutusõiguse seadmise plaan Aseri alevik, Viru-Nigula vald, Lääne maakond,15129 Paide-Roovere-Kuimetsatee,
Katastri nr. 93701:005:0084 M 1:500
Pos 1
Koostas: Marek Banko Hepta Group Energy OÜ projekteerija
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRUMAAKONNAS
Töö nr. 24019
Töö tellija: Enefit AS
JA JÄRVA MAAKONNAS (P2024-08) VT2103
LK 1/7
g37
66.668
g40
66.828
g43
66.770
g44
66.709
g45
66.829
g46
66.841 g47
66.883
g48
66.838
g49
66.818
g50
66.812
g51
66.745
2
52
g53
66.808
g54
66.698
g55
66.560
g56
66.652
g57
66.620
g58
66.491
g59
66.663
g60
66.563
g61
66.558
g62
66.538
g63
66.422
g64
66.685
g65
66.387
g66
66.552
g67
66.515
g68
66.227
g69
66.613
g70
66.705
g71
66.768
g72
66.739
g73
66.610
g74
66.464
g75
66.575
g76
66.506
g77
66.544
g78
66.254
g79
65.933
g80
66.379
g81
66.373
g82
66.088
g83
65.882
g85
66.338
g88
66.272
g90
66.328
TINGMÄRGID
Katastripiir
Kasutusõiguse ala
Projekteeritud side-õhuliin
FO R
M A
A T
A 3
2 97
x 4
20 m
m
Isikliku kasutusõiguse seadmise plaan Aseri alevik, Viru-Nigula vald, Lääne maakond,15129 Paide-Roovere-Kuimetsatee,
Katastri nr. 93701:005:0084 M 1:500
Pos 2
Koostas: Marek Banko Hepta Group Energy OÜ projekteerija
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRUMAAKONNAS
Töö nr. 24019
Töö tellija: Enefit AS
JA JÄRVA MAAKONNAS (P2024-08) VT2103
LK 2/7
g121
65.530
g122
65.663
g123
65.437
g124
65.706
g125
65.720
g126
65.624
g127
65.626
g128
65.505
g129
65.296
g130
65.542
g131
65.506
g132
65.597
g133
65.410
g134
65.459
g135
65.414
g136
65.611
g137
65.439
g138
65.314
g139
65.518
g140
65.605
g141
65.635
g142
65.572
g143
65.664
g144
65.580
g145
65.767
g146
65.573
g147
65.492
g148
65.563
g149
65.589
g685
65.188
TINGMÄRGID
Projekteeritud sideliin maasisene Katastripiir
Kasutusõiguse ala
FO R
M A
A T
A 3
2 97
x 4
20 m
m
Isikliku kasutusõiguse seadmise plaan Aseri alevik, Viru-Nigula vald, Lääne maakond,15129 Paide-Roovere-Kuimetsatee,
Katastri nr. 93701:005:0084 M 1:500
Pos 3
Koostas: Marek Banko Hepta Group Energy OÜ projekteerija
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRUMAAKONNAS
Töö nr. 24019
Töö tellija: Enefit AS
JA JÄRVA MAAKONNAS (P2024-08) VT2103
LK 3/7
g152
65.366
g153
65.299
g154
65.297
g155
65.227
g156
64.638 g157
64.859
g158
64.555
g159
65.302
g160
65.308
g161
65.274
g162
64.756
g163
65.137
g164
65.223
g165
65.050
g166
64.613
g168
65.234
g169
65.177
g170
65.093
g171
65.132
g172
65.130
g173
65.263
g174
65.274
g175
65.277
g176
65.141
g182
65.221
g183
65.150
g184
64.916
g185
65.247
g186
65.315
g187
65.339
g188
65.316
g189
65.299
g190
65.288
g191
65.298
g192
65.292
g193
65.134
g194
65.275
g195
65.238 g196
65.274
g197
65.241
g198
65.262
9
65.251
g200
65.263
g201
65.251
g202
65.204
g203
65.160
g204
65.193
g205
65.249
g206
65.314
g207
65.311
g208
65.280
g209
65.307
g210
65.361
g211
65.348
g212
65.362
g213
65.530
g214
65.475
g215
65.324
g216
65.384
g217
65.404
g218
65.410
g219
65.366
HTO_473539
65.599
g220
65.599
g221
65.477
g222
65.286
g223
66.084
HTO_584569
65.321
g224
65.321
g225
65.174
g226
65.362
g227
65.397
g228
65.189
g229
65.085
g230
65.059
g231
65.404
g232
65.343
g233
65.345
g234
65.325
g235
65.231
g236
65.072
g237
64.952 g238
65.276
g239
64.983
g240
65.067
g241
65.082
g242
65.214
g243
65.354
g244
65.383
g245
65.456
g246
65.440
g247
65.287
g248
65.193
g249
65.236
g250
65.086
g251
65.460
g252
65.256
g253
65.295
g254
65.045
g255
65.407
g256
65.437
g257
65.472
g260
65.405
g261
64.804
g262
65.177
g263
65.273
TINGMÄRGID
Projekteeritud sideliin maasisene Katastripiir
Kasutusõiguse ala
Projekteeritud plastkaev
FO R
M A
A T
A 3
2 97
x 4
20 m
m
Isikliku kasutusõiguse seadmise plaan Aseri alevik, Viru-Nigula vald, Lääne maakond,15129 Paide-Roovere-Kuimetsatee,
Katastri nr. 93701:005:0084 M 1:1000
Pos 4
Koostas: Marek Banko Hepta Group Energy OÜ projekteerija
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRUMAAKONNAS
Töö nr. 24019
Töö tellija: Enefit AS
JA JÄRVA MAAKONNAS (P2024-08) VT2103
LK 4/7
g258
65.462
g259
65.443
g260
65.405
g261
64.804
g262
65.177
g263
65.273
g264
65.262
g265
65.279
g266
64.736
g267
65.463
g268
65.472
g269
65.472
g270
65.482
g271
65.453
g272
65.449
g273
64.723
g274
65.487
g275
65.500
g276
65.440
g277
64.800
g278
65.247
g279
65.332
g280
65.516
g281
65.535
g282
65.543
g283
65.523
g284
65.549
g285
64.693
g286
65.262
g287
65.397
g288
65.274
g289
64.709
g290
65.519
g291
65.472
g292
65.517
g293
65.493
g294
65.484
g295
65.476
g296
64.639
g297
64.588
g298
65.407
g299
65.424
g300
65.393
g301
65.175
g302
65.183
g303
64.518
g304
65.363
g305
65.371
g306
65.332
g307
65.250
g308
65.257 g309
65.191
g310
64.204
g311
64.813
g312
64.892
g313
64.598
g314
64.662
g315
64.571
g316
64.010
g317
64.469
g318
63.950
g319
64.054
g320
64.163
g321
65.117
g322
65.165
g323
65.144
g324
65.129
g325
65.142
g326
65.173
g327
64.472
g328
64.507
g329
65.120
g330
65.120
g331
65.115
g332
64.620
g333
64.564
TINGMÄRGID
Projekteeritud sideliin maasisene Katastripiir
Kasutusõiguse ala
FO R
M A
A T
A 3
2 97
x 4
20 m
m
Isikliku kasutusõiguse seadmise plaan Aseri alevik, Viru-Nigula vald, Lääne maakond,15129 Paide-Roovere-Kuimetsatee,
Katastri nr. 93701:005:0084 M 1:1000
Pos 4
Koostas: Marek Banko Hepta Group Energy OÜ projekteerija
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRUMAAKONNAS
Töö nr. 24019
Töö tellija: Enefit AS
JA JÄRVA MAAKONNAS (P2024-08) VT2103
LK 5/7
g325
65.142
g326
65.173
g328
64.507
g329
65.120
g330
65.120
g331
65.115
g332
64.620
g333
64.564
g334
64.553
g335
64.627
g336
65.160
g337
65.107
g338
65.127
g339
65.088
g340
65.031
g341
65.031
g342
65.014
g343
64.742
g344
64.994
g345
65.020
g346
64.609
g347
64.460
g348
64.747
g349
64.681
g350
65.072
g351
65.049
g352
65.104
g353
65.122
g354
65.091
g355
64.732
g356
64.807
g357
65.217
g358
65.175 g359
65.138
g360
65.153
g361
65.192 g362
64.855
TINGMÄRGID
Projekteeritud sideliin maasisene Katastripiir
Kasutusõiguse ala
FO R
M A
A T
A 3
2 97
x 4
20 m
m
Isikliku kasutusõiguse seadmise plaan Aseri alevik, Viru-Nigula vald, Lääne maakond,15129 Paide-Roovere-Kuimetsatee,
Katastri nr. 93701:005:0084 M 1:1000
Pos 4
Koostas: Marek Banko Hepta Group Energy OÜ projekteerija
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRUMAAKONNAS
Töö nr. 24019
Töö tellija: Enefit AS
JA JÄRVA MAAKONNAS (P2024-08) VT2103
LK 6/7
g360
65.153
g361
65.192 g362
64.855
g363
64.768
g364
65.139 g365
65.159
g366
65.085
g367
65.077 g368
65.015
g369
64.904
g370
64.821
g371
64.980 g372
65.020
g373
64.930
g374
64.942
g375
65.050
g376
65.041
g377
64.939
g378
64.978
g379
65.036
g380
64.939
g381
64.935
g382
65.063
g383
65.018
g384
64.903
g385
64.909
g386
64.884
g387
64.920
g388
65.014
g389
64.894
g390
64.895
g391
64.722
g392
64.156
g393
64.859
g394
64.892
g395
65.050
g443
64.359
g444
64.533
g445
64.547
g446
64.555
g447
64.692
g448
64.606
g449
64.563
g450
64.537 g451
64.569
g452
64.638
g453
64.784
g454
64.752
g455
64.728
g456
65.325
TINGMÄRGID
Projekteeritud sideliin maasisene Katastripiir
Kasutusõiguse ala
FO R
M A
A T
A 3
2 97
x 4
20 m
m
Isikliku kasutusõiguse seadmise plaan Aseri alevik, Viru-Nigula vald, Lääne maakond,15129 Paide-Roovere-Kuimetsatee,
Katastri nr. 93701:005:0084 M 1:1000
Pos 4
Koostas: Marek Banko Hepta Group Energy OÜ projekteerija
SIDEVÕRGU PROJEKTEERIMINE IDA-VIRUMAAKONNAS
Töö nr. 24019
Töö tellija: Enefit AS
JA JÄRVA MAAKONNAS (P2024-08) VT2103
LK 7/7