Dokumendiregister | Justiitsministeerium |
Viit | 21-4/25/5107-1 |
Registreeritud | 12.06.2025 |
Sünkroonitud | 13.06.2025 |
Liik | Sissetulev kiri |
Funktsioon | 21 Digiarengu korraldamine |
Sari | 21-4 Elektroonilise side koostööalane kirjavahetus rahvusvaheliste organisatsioonidega |
Toimik | 21-4/2025 |
Juurdepääsupiirang | Avalik |
Juurdepääsupiirang | |
Adressaat | European Communications Office |
Saabumis/saatmisviis | European Communications Office |
Vastutaja | Tõnu Nirk (Justiits- ja Digiministeerium, Kantsleri vastutusvaldkond, Digitaristu- ja küberturvalisuse valdkond, Digitaristu- ja küberturvalisuse osakond, Sideturgude talitus) |
Originaal | Ava uues aknas |
Tere
Edastame kuuluvuselt Justiits- ja Digiministeeriumile.
Heade soovidega
Majandus- ja Kommunikatsiooniministeerium
From: Anne-Dorthe Hjelm Christensen <[email protected]>
Sent: Thursday, June 12, 2025 1:05 PM
Cc: Public Consultation <[email protected]>
Subject: 2 weeks consultation from WG FM, deadline Thursday 26 June 2025
Tähelepanu!
Tegemist on välisvõrgust saabunud kirjaga. |
To ECC List A
WG FM#110 was held on 2-6 June 2025. WG FM approved the following draft ECC deliverables for public consultation:
Title: “Relating to the use of Short Range Devices (SRD)”
Link: Draft revision of ERC Recommendation 70-03
Title: “Technical characteristics, exemption from individual licensing and free circulation and use of specific radiodetermination applications in the frequency range 116-260 GHz”
Link: Draft revision of ECC Decision (22)03
Title: “Cross-border coordination for Railway Mobile Radio (RMR) in the 900 MHz frequency band excluding GSM-R vs. GSM-R”
Link: Draft ECC Recommendation (25)02
Title: “Guidelines for the protection of FS and FSS and their future deployment when introducing low and medium power terrestrial wireless broadband systems (WBB LMP) in the 3800-4200 MHz band also considering cross border situations”
Link: Draft ECC Recommendation (25)03
Title: “Measuring non-ionising electromagnetic radiation (9 kHz – 300 GHz)”
Link: Draft revision of ECC Recommendation (02)04
In accordance with the ECC Working Methods, we now launch the period of two weeks consultation with administrations. If you have any objection to proceed to the public consultation stage for the above ECC deliverables, please notify Mr. Robin Donoghue ([email protected]) by Thursday 26 June 2025 stating the reasons for your objection.
Provided no objections are received, the public consultation for the above draft ECC deliverables will commence on Friday 27 June 2025 and public consultation will end on Friday 8 August 2025.
During the public consultation period, comments to the content of the above ECC deliverables may be provided by CEPT administrations and any other interested parties.
Kind regards
* ECO has published the Annual Report 2024 - click to read online *
|