Adressaat | Agency for the Cooperation of Energy Regulators (ACER) |
Saabumis/saatmisviis | Agency for the Cooperation of Energy Regulators (ACER) |
Vastutaja | Armin Ilisson (Konkurentsiamet, Regulatsiooniteenistus, Energiaturgude osakond) |
Originaal | Ava uues aknas |
Page 1 of 8
PUBLIC
DECISION No 04/2025
OF THE EUROPEAN UNION AGENCY
FOR THE COOPERATION OF ENERGY REGULATORS
of 23 June 2025
on the request of the regulatory authorities of the Baltic capacity
calculation region to extend the period for reaching an agreement on the
proposal for the cross-zonal capacity calculation methodology for the long-
term timeframe
THE EUROPEAN UNION AGENCY FOR THE COOPERATION OF ENERGY
REGULATORS,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EU) 2019/942 of the European Parliament and of the Council of
5 June 2019 establishing a European Union Agency for the Cooperation of Energy Regulators1,
and, in particular, Articles 5(3) and 6(10) thereof,
Having regard to Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing
a guideline on forward capacity allocation2 and, in particular, Articles 4(5), 4(7)(a), 4(11) and
10(1) thereof,
Having regard to the outcome of the consultation with ACER’s Electricity Working Group,
Having regard to the favourable opinion of the Board of Regulators of 20 June 2025, delivered
pursuant to Article 22(5)(a) of Regulation (EU) 2019/942,
Whereas:
1. INTRODUCTION
(1) Commission Regulation (EU) 2016/1719 (the ‘FCA Regulation’) sets out requirements
for cross-zonal capacity allocation and congestion management in the long-term (‘LT’)
time frame in electricity. These requirements include the development of a common
1 OJ L 158, 14.6.2019, p. 22. 2 OJ L 259, 27.9.2016, p. 42.
PUBLIC
Decision No 04/2025
Page 2 of 8
capacity calculation methodology (‘CCM’) in each of the capacity calculation regions
(‘CCR’) in accordance with Article 10 of this Regulation.
(2) The present Decision follows from the request of the regulatory authorities of the Baltic
CCR, which includes Estonia, Finland, Latvia, Lithuania, Poland and Sweden, to extend
the period for reaching an agreement on the amended proposal for the methodology for
cross-zonal capacity calculation for the long term timeframes in accordance with Article
10(1) of the FCA Regulation which the transmission system operators (the ‘TSOs’) of
the Baltic CCR submitted. The requested extension is for three months, pursuant to
Article 6(10), subparagraph three, of Regulation (EU) 2019/942.
2. PROCEDURE
2.1. Proceedings in the period 2019-2023
(3) By 17 July 2019, the Baltic regulatory authorities received an ‘All Baltic CCR TSOs’
Common Capacity Calculation Methodology for Long-term Time Frames in
Accordance with Article 10(1) of the Commission Regulation (EU) 2016/1719 of 26
September 2016 Establishing a Guideline on Forward Capacity Allocation’ (the ‘initial
Proposal’).
(4) On 17 January 2020, the Baltic regulatory authorities issued a request for amendment
of the TSOs’ initial Proposal.
(5) By 18 March 2020, the Baltic regulatory authorities received the amended ‘All Baltic
CCR TSOs’ Common Capacity Calculation Methodology for Long-term Time Frames
in Accordance with Article 10(1) of the Commission Regulation (EU) 2016/1719 of 26
September 2016 Establishing a Guideline on Forward Capacity Allocation’ (the
‘amended initial Proposal’).
(6) In a letter dated 18 May 2020, the Baltic regulatory authorities, informed ACER that
they jointly agreed to request ACER to adopt a decision on the amended initial Proposal
pursuant to Article 4(11) of the FCA Regulation due to their diverging views.
(7) In its Decision No 27/2020 of 17 November 20203, ACER found the amended initial
Proposal not compliant with EU law in numerous areas which needed to be addressed
in order to approve the amended initial Proposal. Further, the amendments aiming to
address incompliance with the FCA Regulation and Commission Regulation (EU)
2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and
congestion management (the ‘CACM Regulation’) would inevitably make the Baltic LT
CCM incompliant with the existing agreement among the TSOs of Estonia, Latvia,
Lithuania, Belarus and Russia (the ‘BRELL agreement’). ACER understood that the
BRELL agreement could not be amended or abolished before the desynchronization of
3 ACER Decision No 27/2020 of 17 November 2020 rejecting the Baltic CCR TSOs’ proposal for the long-term
capacity
PUBLIC
Decision No 04/2025
Page 3 of 8
the Baltic networks from Russia and Belarus as this would endanger operational security
of the Baltic networks. For this reason, the amended initial Proposal could only be made
compliant with the FCA Regulation and the CACM Regulation for the period after
desynchronization of the Baltic networks from Russia and Belarus.
(8) Accordingly, ACER rejected the amended initial Proposal and asked the Baltic TSOs to
revise and resubmit it no later than 24 months after Decision No 27/2020. As the
Decision was issued on 17 November 2020, the deadline was set to 17 November 2022.
(9) In a letter received by ACER on 16 February 2023, the Baltic TSOs explained that they
would intend to provide a proposal for the day-ahead and intraday capacity calculation
methodology (‘DA/ID CCM’) for the Baltic CCR by the second quarter of 2023. As the
Baltic LT CCM needed to be compatible with the corresponding DA/ID CCM, they
planned to submit the LT CCM after the approval of the DA/ID CCM.
2.2. Baltic DA/ID CCM and synchronisation with Continental Europe
(10) The Baltic DA/ID CCM was approved by the Baltic regulatory authorities in January
2025. Its implementation was scheduled for the date of the synchronisation of Estonia,
Latvia and Lithuania with Continental Europe.
(11) On 8 February 2025, the networks of Estonia, Latvia and Lithuania were desynchronised
from Russia and Belarus, which also ended the BRELL agreement. On 9 February 2025,
those networks were successfully synchronised with Continental Europe.
2.3. Proceedings during 2024 and 2025
(12) On 21 May 2024, the Baltic TSOs submitted the LT CCM proposal to the Baltic
regulatory authorities.
(13) On 20 November 2024, the Baltic regulatory authorities issued a request for amendment
to the Baltic TSOs.
(14) By 22 January 2025, the Baltic TSOs had submitted their amended proposal on (the
‘Proposal’) to the last of the Baltic regulatory authorities.
(15) By letter dated 19 March 2025, Urząd Regulacji Energetyki (‘URE’), the regulatory
authority of Poland, submitted, also on behalf of all regulatory authorities of the Baltic
CCR, to ACER a joint request to grant a three-month extension according to Article
6(10), subparagraph three, of Regulation (EU) 2019/942, to decide upon the Proposal.
(16) According to the letter, as the regulatory authorities of the Baltic CCR received the
TSOs’ Proposal on 22 January 2025, and accordingly the two-month deadline for the
approval is bound to expire on 23 March 2025.
(17) In support of the request for extension, the letter explains that:
‘Article 10(3) FCA Regulation requires that the capacity calculation methodology shall
be compatible with the capacity calculation methodology established for the day-ahead
PUBLIC
Decision No 04/2025
Page 4 of 8
and intraday time frames pursuant to Article 21(1) of Regulation (EU) 2015/1222
(DA/ID CCM). To fully assess all relevant compatibility aspects, the NRAs require
additional time for the assessment and coordination. Furthermore, the NRAs need to
further assess the proposed allocation constraint (the allocation constraint is described
in annex 1). The annex has been addressed in CCR Hansa and the Hansa NRAs expect
to receive, in light of the balancing market reform in Poland, an updated annex for the
DA/ID CCM in CCR Hansa in April. Consequently, the NRAs view this information as
necessary for assessing the CCR Baltic LT CCM.
The NRAs are thus of the view that they would need to revise the proposal according to
Article 4(5) of the FCA regulation and Article 5(6) of Regulation (EU) 2019/942 of the
European Parliament and of the Council of 5 June 2019 establishing an Agency for the
Corporation of Energy Regulators ("the Regulation 2019/942") and within 3 months
following the extension, if granted by ACER, the NRAs will strive to reach a unanimous
agreement on the CCR Baltic amended LT CCM proposal.’4
(18) The regulatory authorities of the Baltic CCR consider that these issues merit a three-
month extension of the deadline to adopt a decision. The letter also states that within
three months following the extension, if granted by ACER, the regulatory authorities of
the Baltic CCR will strive to reach a unanimous agreement on the Proposal.
(19) On 20 May 2025, a proposed draft of the present decision was submitted to ACER’s
Electricity Working Group for consultation in accordance with Article 24(2) of
Regulation (EU) 2019/942.
(20) By email of 22 May 2025, URE, on behalf of all regulatory authorities of the Baltic
CCR, confirmed that the present request is meant to extend the deadline for reaching an
agreement on the TSOs’ Proposal until 24 June 2025.
(21) On 4 June 2025, ACER’s Electricity Working Group endorsed the draft ACER Decision
on the request of the regulatory authorities of the Baltic CCR to extend the period for
reaching an agreement on the Proposal until 24 June 2025.
(22) On 20 June 2025, ACER’s Board of Regulators issued a favourable opinion pursuant to
Article 22(5)(a) of Regulation (EU) 2019/942.
3. ASSESSMENT OF THE REQUEST
3.1. Legal framework
(23) According to point (b) of the first subparagraph of Article 5(3) of Regulation (EU)
2019/942, all regulatory authorities of the region concerned shall unanimously agree on
proposals for terms and condition or methodologies for the implementation of those
4 CCR Hansa includes the bidding zones of Denmark 1, Denmark 2, Germany/Luxembourg, Sweden 4, Poland,
the Netherlands and Norway 2.
PUBLIC
Decision No 04/2025
Page 5 of 8
network codes or guidelines that were adopted before 4 July 2019 and, where no
unanimous agreement has been reached, shall refer the relevant proposal to ACER for
approval in accordance with point (a) of the second subparagraph of Article 6(10) of
Regulation (EU) 2019/942.
(24) According to point (a) of the second subparagraph of Article 6(10) of Regulation (EU)
2019/942, ACER shall decide on regulatory issues having effects on cross-border trade
or cross-border system security, which require a joint decision by at least two regulatory
authorities, where such competences have been conferred on the regulatory authorities
under network codes and guidelines adopted before 4 July 2019 and subsequent
revisions of those network codes and guidelines and where the competent national
regulatory authorities have not been able to reach an agreement within a period of six
months from the referral of the case to the last of those regulatory authorities.
(25) According to the third subparagraph of Article 6(10) of Regulation (EU) 2019/942, the
competent national regulatory authorities may jointly request that the six-month period
is extended by a period of up to six months.
(26) According to Article 4(7)(a) of the FCA Regulation (which has been adopted as a
guideline before 4 July 2019), the regulatory authorities of the capacity calculation
region shall review and approve the TSOs’ proposal for the methodology for cross-zonal
capacity calculation for long-term timeframes.
(27) According to Article 4(9) of the FCA Regulation, where the approval of the terms and
conditions or methodologies requires a decision by more than one regulatory authority,
the competent regulatory authorities shall consult and closely cooperate and coordinate
with each other in order to reach an agreement, and they shall take decisions concerning
the submitted terms and conditions or methodologies in accordance with Article 4(7),
within six months following the receipt of the terms and conditions or methodologies
by the last regulatory authority concerned.
(28) According to Article 4(11) of the FCA Regulation, where, following a request from the
relevant regulatory authorities, the submitted proposal for the methodology have been
resubmitted with amendments, the relevant regulatory authorities shall decide on that
amended methodology within two months following the resubmission.
(29) According to Article 4(11) of the FCA Regulation, where the relevant regulatory
authorities have not been able to reach an agreement on the amended methodology
within the two-month deadline, ACER shall adopt a decision concerning the amended
methodology within six months, in accordance with Article 5(3) and the second
subparagraph of Article 6(10) of Regulation (EU) 2019/942.
3.2. Admissibility
(30) Article 4(11) of the FCA Regulation stipulates that ACER shall take its decision in
accordance with Articles 5(3) and 6(10) of Regulation (EU) 2019/942 when the
regulatory authorities did not reach an agreement within the two-month deadline. Thus,
PUBLIC
Decision No 04/2025
Page 6 of 8
ACER’s competence is made contingent upon the expiry of the two-month period
referred to in Article 4(11) of the FCA Regulation.
(31) Therefore, the transfer of the decision-making competence from the regulatory
authorities to ACER under Article 4(11) of the FCA Regulation may also be subject to
an extension of the regulatory authorities’ deadline to reach an agreement, in accordance
with Article 6(10), subparagraph three, of Regulation (EU) 2019/942.
(32) For an extension of this two-month period, the joint request by the competent regulatory
authorities should be submitted before the end of the period for reaching an agreement,
and the maximum requested extension should not exceed the period of six months in
accordance with Article 6(10), third subparagraph, of Regulation (EU) 2019/942.
(33) The Proposal to which the request for extension is related falls under the competence of
the requesting regulatory authorities pursuant to Articles 4(7)(a) of the FCA Regulation.
Accordingly, they are also the competent regulatory authorities that may request an
extension of the two-month period for reaching an agreement under Article 4(11) of the
FCA Regulation.
(34) In that regard it is to note that the request for extension was submitted by URE, the
regulatory authority of Poland, on behalf of all regulatory authorities of the Baltic CCR.
(35) It follows from the above, that the relevant competent regulatory authorities to raise the
present request with ACER are the regulatory authorities of the Baltic CCR.
(36) Since the last competent regulatory authority of the Baltic CCR received the Proposal
on 22 January 2025, the competent regulatory authorities were required to agree on it
by Monday, 24 March 2025 (given that 22 and 23 March 2025 fell on Saturday and
Sunday respectively), in accordance with the two-month period of Article 4(11) of the
FCA Regulation. The request for extension was received by ACER on 19 March 2025,
hence before the expiry of the two-month deadline.
(37) In their initial request, the regulatory authorities of the Baltic CCR asked for an
extension of three months, which, given their understanding of the initial deadline
ending on 23 March 2025, led to a requested deadline of 23 June 2025. In ACER’s view,
however, the initial deadline ended on 24 March 2025 so that an extension by three
months results in a new deadline of 24 June 2025. As confirmed by the regulatory
authorities of the Baltic CCR in the email of 22 May 2025, the requested extension is
indeed until 24 June 2025. As such, the requested extension does not exceed the
maximum limit of six months as provided for in Article 6(10), subparagraph three, of
Regulation (EU) 2019/942.
(38) In light of the above, ACER considers the request for extension admissible.
3.3. Substance
(39) Article 6(10), subparagraph three, of Regulation (EU) 2019/942 does not lay down
requirements for the justification of an extension.
PUBLIC
Decision No 04/2025
Page 7 of 8
(40) The justification provided by the requesting regulatory authorities, as reported at recital
(17) above, indicates the need for additional time to properly assess the compatibility of
the proposal for Baltic long-term capacity calculation methodology with the relevant
Baltic day-ahead and intraday capacity calculation methodology pursuant to Article
21(1) of the CACM Regulation. The justification also indicates the need to await the
assessment of the allocation constrains of Poland, which are being addressed within the
pending amendment of the day-ahead and intraday capacity calculation methodology in
Hansa CCR, intended to be submitted by the Hansa TSOs in April 20255. An extension
by three months would allow the regulatory authorities of the Baltic CCR to assess the
required consistency with the day-ahead and intraday methodologies, as well as the
proposed allocation constraints for Poland in light of the balancing market reform.
(41) ACER understands from this justification that the additional period of three months is
needed to allow sufficient time for the regulatory authorities of the Baltic CCR to
properly assess the Proposal’s compatibility with the corresponding Baltic day-ahead
and intraday capacity calculation methodology, having in mind recent synchronisation
of Estonia, Latvia and Lithuania with Continental Europe Synchronous Area from
February 2025, when these methodologies were applied for the first time. Furthermore,
the additional period enables the relevant regulatory authorities to properly assess
Proposal’s annex with proposed consideration of Polish allocation constraints.
(42) ACER considers that continuing and completing the regulatory authorities’ ongoing
assessment can contribute to the efficient conclusion of the pending approval
proceedings. In ACER’s view, this continuation and completion would not unduly
impact the fulfilment of the objectives of the FCA Regulation. Under those
circumstances, ACER deems it reasonable to enable the regulatory authorities to
conclude the pending approval proceedings.
(43) Furthermore, ACER considers that the request for extension until 24 June 2025 is
proportionate in light of the activities to be performed by the competent regulatory
authorities to adopt a decision on the Proposal in accordance with Article 4(9) and 4(11)
of the FCA Regulation.
(44) Therefore, ACER deems it appropriate and justified to grant an extension until 24 June
2025.
4. CONCLUSION
(45) For the above reasons, ACER accepts the request for an extension submitted by the
regulatory authorities of the Baltic CCR and extends the period for those regulatory
authorities to reach an agreement on the Proposal, until 24 June 2025.
5 According to the information from the Polish regulatory authority URE, the Hansa TSOs submitted the
amendment proposal of Hansa DA/ID CCM on 29 April 2025.
PUBLIC
Decision No 04/2025
Page 8 of 8
HAS ADOPTED THIS DECISION:
Article 1
The period within which the regulatory authorities of the Baltic Capacity Calculation Region,
i.e. of Estonia, Finland, Latvia, Lithuania, Poland and Sweden, shall reach an agreement on the
proposal for the methodology for cross-zonal capacity calculation for the long term timeframes
in accordance with Article 10(1) of Commission Regulation (EU) 2016/1719 is extended, in
accordance with Article 6(10) of Regulation (EU) 2019/942, until 24 June 2025.
Article 2
This Decision is addressed to:
1. Konkurentsiamet (Estonia)
2. Energiavirasto (Finland)
3. Valstybinė energetikos reguliavimo taryba (Lithuania)
4. Sabiedrisko pakalpojumu regulēšanas komisija (Latvia)
5. Urząd Regulacji Energetyki (Poland)
6. Energimarknadsinspektionen (Sweden)
Done at Ljubljana, on 23 June 2025.
- SIGNED -
Fоr the Agency
The Director
C. ZINGLERSEN
In accordance with Article 28 of Regulation (EU) 2019/942, the addressees may
appeal against this Decision by filing an appeal, together with the statement of
grounds, in writing at the Board of Appeal of the Agency within two months of the
day of notification of this Decision.
In accordance with Article 29 of Regulation (EU) 2019/942, the addressees may
bring an action for the annulment before the Court of Justice only after the
exhaustion of the appeal procedure referred to in Article 28 of that Regulation.
European Union Agency for the Cooperation of Energy Regulators, Trg republike 3, 1000 Ljubljana, Slovenia
[email protected] / +386 8 205-3409
Page 1 of 2
Ljubljana, 23 June 2025
acer.ele.dir(2025)7059476
By e-mail only
To the attention of:
Energiavirasto
Energimarknadsinspektionen
Sabiedrisko pakalpojumu regulēšanas komisija
Konkurentsiamet
Urząd Regulacji Energetyki
Valstybinė energetikos reguliavimo taryba
Subject: ACER Decision No 04/2025 on the request of the regulatory authorities of
the Baltic capacity calculation region to extend the period for reaching an
agreement on the proposal for the cross-zonal capacity calculation
methodology for the long-term timeframe
Dear Madam, dear Sir,
Please find enclosed the Agency’s Decision on the request of the regulatory authorities of the Baltic capacity calculation region to extend the period for reaching an agreement on the proposal for the cross-zonal capacity calculation methodology for the long-term timeframe.
On 20th June 2025, the Decision was given the favourable opinion of the Board of Regulators pursuant to Article 22(5)(a) of Regulation (EU) 2019/942.
Yours sincerely,
Christian Zinglersen Director
European Union Agency for the Cooperation of Energy Regulators, Trg republike 3, 1000 Ljubljana, Slovenia
[email protected] / +386 8 2053 400
Page 2 of 2
Copy:
- Lukasz Kolinski, Director, DG Ener, Directorate C, European Commission,
- Clara Poletti, Chair of the ACER Board of Regulators, [email protected]