| Dokumendiregister | Transpordiamet |
| Viit | 7.1-2/25/7052-6 |
| Registreeritud | 04.09.2025 |
| Sünkroonitud | 05.09.2025 |
| Liik | Valjaminev kiri |
| Funktsioon | 7.1 Teetaristuga seotud õiguste andmine |
| Sari | 7.1-2 Väliste isikute ehitiste ja lubade kooskõlastamise dokumendid |
| Toimik | 7.1-2/2025 |
| Juurdepääsupiirang | Avalik |
| Juurdepääsupiirang | |
| Adressaat | Harku Vallavalitsus |
| Saabumis/saatmisviis | Harku Vallavalitsus |
| Vastutaja | Laur Kõiv (Users, Teehoiuteenistus, Planeerimise osakond, Tehnovõrkude üksus) |
| Originaal | Ava uues aknas |
19.08.2025 1/18
Pikk tn 19 ja 19a kinnistute järgsed teed ning tehnovõrgud Töö nr 23035
Harku alevik, Harku vald, Harju maakond Road-Expert OÜ
TEEDEEHITUSLIK OSA / EELPROJEKT Seletuskirja koostas: Kert Jõeäär
I SELETUSKIRI
Sisukord 1. Üldosa .............................................................................................................................................. 3
1.1. Kontaktandmed ......................................................................................................................... 3 2. Olemasolev olukord ......................................................................................................................... 3
2.1. Olemasoleva olukorra kirjeldus ................................................................................................ 3 2.2. Kaitsealused objektid ................................................................................................................ 3 2.3. Olemasolevad tehnovõrgud ....................................................................................................... 4
3. Planeeringud ning seotud projektid ................................................................................................. 4 3.1. Harku alevikus Pikk tn 19 ja Pikk tn 19a kinnistute ning lähiala detailplaneering ................... 4 3.2. Harku alevikus Betooni, Betooni 1-3, Betoooni 5, Betooni 7 kinnistute detailplaneeringu ala
teed ja tehnovõrgud. I projekteerimisetapp. ......................................................................................... 4 4. Etapid ............................................................................................................................................... 5 5. Geodeetiline mõõdistusvõrk ............................................................................................................ 5 6. Uuringud .......................................................................................................................................... 5
6.1. Ehitusgeodeetilised uuringud .................................................................................................... 5 6.2. Ehitusgeoloogilised uuringud .................................................................................................... 5
6.2.1. Geoloogiline ehitus ............................................................................................................ 5 6.2.2. Pinnaseveetase ................................................................................................................... 7 6.2.3. Geoloogilised tingimused .................................................................................................. 7
7. Projektlahendus ................................................................................................................................ 8 7.1. Üldandmed ................................................................................................................................ 8 7.2. Plaanilahendus ........................................................................................................................... 8
7.2.1. Mahasõidud ........................................................................................................................ 9 7.3. Vertikaalplaneering ................................................................................................................... 9 7.4. Katend ....................................................................................................................................... 9
7.4.1. Projekteeritud katendikonstruktsioonid ............................................................................. 9 7.5. Tee-ehitusmaterjalid ................................................................................................................ 10
7.5.1. Nõuded materjalidele ....................................................................................................... 10 7.6. Veeviimarid ............................................................................................................................. 12
7.6.1. Sademevee ära juhtimine ja kraavid ................................................................................ 12 7.6.2. Truubid ............................................................................................................................. 12
7.7. Konstruktsioonid ..................................................................................................................... 12 7.8. Liikluskorraldus- ja ohutusvahendid ....................................................................................... 12
7.8.1. Liiklusmärgid ................................................................................................................... 12 7.8.2. Teekattemärgistus ............................................................................................................ 13
7.9. Tehnovõrgud ........................................................................................................................... 13 7.10. Keskkonnakaitse...................................................................................................................... 13 7.11. Maastikukujundustööd ............................................................................................................ 14
7.11.1. Ettevalmistus ja haljastuse likvideerimine ....................................................................... 14 7.11.2. Puude kaitsmine ehitustööde ajal ..................................................................................... 14 7.11.3. Projekteeritud haljastus .................................................................................................... 14
19.08.2025 2/18
Pikk tn 19 ja 19a kinnistute järgsed teed ning tehnovõrgud Töö nr 23035
Harku alevik, Harku vald, Harju maakond Road-Expert OÜ
TEEDEEHITUSLIK OSA / EELPROJEKT Seletuskirja koostas: Kert Jõeäär
8. Tööde teostamine ........................................................................................................................... 15 8.1. Üldosa...................................................................................................................................... 15 8.2. Ettevalmistustööd .................................................................................................................... 15
8.2.1. Teetööde lühikirjeldus ..................................................................................................... 16 8.2.2. Nõuded mulde ja aluse tihendustegurile ning kandevõimele .......................................... 16
9. Hooldusjuhend ............................................................................................................................... 17 9.1. Suvihoole ................................................................................................................................. 17 9.2. Talihoole.................................................................................................................................. 18 9.3. Liikluskorraldusvahendite hoole ............................................................................................. 18 9.4. Haljastuse hoole ...................................................................................................................... 18
19.08.2025 3/18
Pikk tn 19 ja 19a kinnistute järgsed teed ning tehnovõrgud Töö nr 23035
Harku alevik, Harku vald, Harju maakond Road-Expert OÜ
TEEDEEHITUSLIK OSA / EELPROJEKT Seletuskirja koostas: Kert Jõeäär
1. ÜLDOSA
Käesolev projekt on koostatud Astlanda Kinnisvara OÜ tellimusel. Projekti koostamisel on aluseks
võetud tellija poolt väljastatud projekteerimistingimused, tehniline kirjeldus, võrguvaldajate tehnilised
tingimused ning projekti koosolekutel vastu võetud otsused.
Projekti eesmärk on projekteerida Pikk tn, Päikese tn ja Kuu tn sõiduteed ja jalg- ja jalgrattateed.
Projekteerimisel on arvestatud Eestis kehtivaid seadusi, standardeid, normdokumente ning juhendeid,
mis on kätte saadavad Elektroonilise Riigi Teataja kataloogist - www.riigiteataja.ee, Eesti Standardimis-
ja Akrediteerimiskeskus – www.evs.ee ning Transpordiameti veebilehel -
www.transpordiamet.ee/juhendid.
1.1. Kontaktandmed
Tellija:
Astlanda Kinnisvara OÜ
Mäealuse 2/4
+372 6988 000
Projekteerija:
Road-Expert OÜ
Kadaka tee 42b, Tallinn, Harjumaa 12915
+372 5665 0034
reg nr: 14449962
2. OLEMASOLEV OLUKORD
2.1. Olemasoleva olukorra kirjeldus
Olemasolevad krundid asuvad Harju maakonnas, Harku alevikus endise Harku naistevangla
territooriumil, mille põhja ossa rajatakse kahe kuni kolme korruselised kortermajad koos nende vaheliste
teedega. Lõunapoolsesse ossa plaanitakse rida- ja ühepere elamud. 1920-ndatel rajatud Harku
kinnipidamiseasutus suleti 2016. a. Ja sellest ajast lõpetati ka vanglahoonete kasutamine. Aastate jooksul
on hooneid lammutatud ja ka uusi rajatud.
Reljeef on tasane, väikese langusega põhja ja kirde suunas. Maapinda on tõstetud, reljeefi liigestavad
täitekuhjatised ja tiik. Maapinna kõrgused on vahemikus 28,6...34,4m.
Alast ida ja lõuna suunas paikneb rabamassiiv – Harku raba, Mustraba, Valgeraba ja Kollane raba.
Rabamassiivil on maapinna kõrgus reeglina suurem – Mustarabas 30…31 m, Harku rabas 38...40 m ja
Valgerabas 38…43 m. Rabad uuringuala vahetus naabruses tagavad pideva pinnasevee pideva
juurdevoolu huvialale, mistõttu on veetase pidevalt kõrgel. Huvialast lõunas asub Mõisajärv, mille
veetaseme määrab veetase raba servaaladel ja paikneb absoluutkõrgusel 37 m, kõrgemal kui uuringuala
maapind.
Pinnasevee taseme alandamine huvialal on väga keeruline, kuna eelvool Paldiski mnt alt on piiratud.
2.2. Kaitsealused objektid
Projekteeritud ehitustööde ala ei jää kultuurimälestiste kaitsevööndisse.
19.08.2025 4/18
Pikk tn 19 ja 19a kinnistute järgsed teed ning tehnovõrgud Töö nr 23035
Harku alevik, Harku vald, Harju maakond Road-Expert OÜ
TEEDEEHITUSLIK OSA / EELPROJEKT Seletuskirja koostas: Kert Jõeäär
2.3. Olemasolevad tehnovõrgud
Sidevarustus:
Projekteeritaval alal asuvad sidevarustuse kaablikanalisatsioon ning side maakaabel.
Sidevarustuse haldaja on Telia Eesti AS.
Veevarustus ja kanalisatsioon:
Projekteeritaval alal asuvad vee- ja kanalisatsioonitorustikud.
Torustike haldaja on Osaühing Strantum.
Elektrivarustus:
Projekteeritaval alal asuvad elektrivarustuse maakaablid ning õhuliinid.
Elektrivarustuse haldaja on Elektrilevi OÜ.
Välisvalgustus:
Projekteeritaval alal on olemasolev välisvalgustus.
Välisvalgustuse haldaja on Harku Vallavalitsus.
Soojusvarustus:
Projekteeritaval alal asub kaugküttetorustik.
Kaugküttetorustiku haldaja on SW Energia OÜ.
3. PLANEERINGUD NING SEOTUD PROJEKTID
3.1. Harku alevikus Pikk tn 19 ja Pikk tn 19a kinnistute ning lähiala
detailplaneering
Alal on kehtiv detailplaneering nimetusega „Pikk tn 19 ja 19a kinnistute detailplaneering“. Projekt on
koostatud Ruum ja Maastik OÜ poolt, töö nr T032-062/08.
Detailplaneeringu koostamise eesmärgiks on Harku vangla maa-ala jagamine elamumaa, sotsiaalmaa,
transpordimaa ja tootmismaa kruntideks ning ehitusõiguse seadmine. Samuti aga ka planeeritavate
kruntide juurdepääsude, haljastuse, heakorra ja tehnovõrkude vasustatuse planeerimine.
Käesolev teedeosa projekt on otseselt seotud antud detailplaneeringuga, kuna Pikk tn, Päikese tn ja
Kuu tänav tulevad endisele Harku vangla maa-alale, mis on juba kruntideks jaotatud eelnevalt
mainitud detailplaneeringu raames.
3.2. Harku alevikus Betooni, Betooni 1-3, Betoooni 5, Betooni 7 kinnistute
detailplaneeringu ala teed ja tehnovõrgud. I projekteerimisetapp.
Töö on koostatud SWECO Projekt AS poolt, töö nr 21240-001301. Töö eesmärk on sarnane, mis
käesoleval teedeosa projektil. Territoorium on kruntideks jaotatud ning tegemist on tänavate ja
tehnovõrkude lahendustega.
19.08.2025 5/18
Pikk tn 19 ja 19a kinnistute järgsed teed ning tehnovõrgud Töö nr 23035
Harku alevik, Harku vald, Harju maakond Road-Expert OÜ
TEEDEEHITUSLIK OSA / EELPROJEKT Seletuskirja koostas: Kert Jõeäär
Käesolev teedeosa projekt ja SWECO Projekt AS poolt koostatav projekt tuleb omavahel siduda Pikk
tn põhjapoolses otsas, kus see liitub Aia tänavaga.
4. ETAPID
Arendusala on jaotatud etappideks:
1. etapp - rajatakse teed ja kõik tehnovõrgud, selle etapijärgselt on võimalik kõikide Kuu tänava
kruntide arendamine, sh: Kuu tn 1, 3, 5, 7, 9 ja Kuu tn 2, 4, 6, 8, 10, 12, 14, 16, 18, 20
1. etapp - rajatakse VK võrgud, reoveepumpla ja killustikkattega juurdepääsutee pumplale
2. etapp - rajatakse teed ja ülejäänud tehnovõrgud
2. etapp - rajatakse teed ja kõik tehnovõrgud, peale teise etapi valmimist on võimalik kõikide
planeeringuala kruntide arendamine
Etappide skeem on toodud joonisel 23035_EP_TL-4-05_etapid.pdf.
5. GEODEETILINE MÕÕDISTUSVÕRK
Projekteeritud ehitustööde alasse ei jää geodeetilise põhivõrgu punkte.
6. UURINGUD
6.1. Ehitusgeodeetilised uuringud
AS EXACT Geomark töö nimega „Pikk tn 19, 19a ja lähiala“ töö nr 10031.
6.2. Ehitusgeoloogilised uuringud
IPT Projektijuhtimine OÜ töö nimega „Pikk tn 19 ja 19a Harku alevik, Harku vald, Harju maakond“,
töö nr 23-08-1829.
6.2.1. Geoloogiline ehitus
Kiht A Asfalt
Pika tänava ja siseteede katteks on asfalt paksusega 0,08...0,15 m.
Kiht K Lubjakivikillustik
Lubjakivikillustik moodustab asfaltkatte aluse 0,19...0,35 m pkasuselt.
Kiht KS Lubjakivisõelmed
Lubjakivisõelmed on vangla perimeetril olevate valveaedade vahel pindmiseks kihiks paksusega
0,25...0,70 m.
Täitepinnas esineb kogu vaadeldaval alal ja on koostise järgi jaotatud neljaks erimiks: mullane täide
ehitusprahiga (kiht 1, 1A) ja liiv (kiht 2) või savikas möll kruusa ja vähese mullaga (kiht 2A).
Kiht 1 Täide: muld ehitusprahiga
19.08.2025 6/18
Pikk tn 19 ja 19a kinnistute järgsed teed ning tehnovõrgud Töö nr 23035
Harku alevik, Harku vald, Harju maakond Road-Expert OÜ
TEEDEEHITUSLIK OSA / EELPROJEKT Seletuskirja koostas: Kert Jõeäär
Täiteline mullakiht sisaldab ehitusprahti kruusa, liiva, paetükke, tuhka, tellise- ja klaasijäätmeid jms.
Jämepurdse täitematerjali sisaldus on varieeruv. Eraldatud kiht esineb endise vangla territooriumil
pindmise kihina või kattekihtide all. Mullase täitepinnase paksus on 0,4...1,5 m.
Kiht 1A Täide
Alakihina (kiht 1A) on eraldatud kivine ehituspraht (killustik, paetükid, tellisejäänused, kruus, kunagise
katlamaja ümbruses puuraugus PA42 tuhk, šlakk, põletusjäätmed mullase vahetäitega. Kunagise
katlamaja taha jääv kuhjatis koosneb katlamaja jäätmetest (PA42). Kihi paksus on 0,45...0,90 m, kohati
kuni 1,5 m ja enamgi.
Kiht 2 Täide : liiv
Keskliiv on paiguti segunenud mullaga, paesõelmetega, sisaldab üksikuid kive. Täiteliiv moodustab
läätsedena perimeetris katteks olevate paesõelmete lamami. Kihi paksus on 0,4...0,7 m.
Kiht 2A Täide: savikas möll
Eraldatud kiht koosneb savikast möllist kruusaga/ liivaga ja esineb vaid Pika tänava lõikes (PA26 kuni
PA28) 0,25...0,58 m paksuselt. Täitekihtide all lasuvad looduslikud pinnased: muld, turvas, peenliiv ja
mölline peenliiv.
Kiht 3 Muld
Looduslik muld on valdavalt kogu alal säilinud kattekihtide, täitepinnaste all ja väljaspool
kaitseaedadega ümbritsetud territooriumi pindmise kihina. Kihi paksus on 0,15...0,85 m, keskmiselt
0,3...0,5 m.
Kiht 4 Turvas
Turvas on keskmiselt kuni hästi lagunenud, sisaldab paikselt orgaanikaga liiva kuni 0,1 m paksusi
vahekihte. Turvas levib ala põhja-idasuunalisel osal ja jääb täitepinnaste alla või on osaliselt asendatud.
Kihi paksus on 0,2...1,15 m.
Kiht 5 Muda
Eraldatud kiht koosneb veeküllastunud mudast vähese liivaga või mölliga. Muda moodustab
turbakompleksi alumise osas või on jäänuk turbakihi eemaldamisest. Kihi pealispind on 0,75...1,50 m
sügavusel maapinnast, absoluutkõrgustel 28...29,5 m. Paksus on 0,2...0,65 m.
Kiht 6 Liiv
Peen- ja keskliiv esineb läätsedena ala kirdeosas. Liivakihi ülemises osas on orgaanilist ainet, alumises
osas kesk- ja jämeliiva vahekihte. Valdavalt veeküllastunud liiv on laialdase levikuga ala kirdeservas
(PA18, 19, 20, 42), kus paksus on 0,9...1,75 m. Ülejäänud alal esineb 0,2...0,4 m liivaläätsi turba või
täitekihi all. Pealispind on 1,2...1,9 m sügavusel, absoluutkõrgusel 28,5...29 m..
Kiht 7 Savimöll
Jämepurruta savimöll on kihiti liivane või üleminekuga möllsaviks, määrdunud pruun kunikollakasbeež,
konsistentsilt pehme. Tegemist võib olla läbipestud moreeniga või jääjärveliste savipinnastega.
19.08.2025 7/18
Pikk tn 19 ja 19a kinnistute järgsed teed ning tehnovõrgud Töö nr 23035
Harku alevik, Harku vald, Harju maakond Road-Expert OÜ
TEEDEEHITUSLIK OSA / EELPROJEKT Seletuskirja koostas: Kert Jõeäär
Eraldatud kiht esineb ala keskosas loode-kagusuunalise lõiguna (PA6, 9, 10, 32, 39) lubjakivi või
moreeni peal. Pealispind on 1...1,3 m sügavusel, absoluutkõrhusel 29...30,5 m, kihi paksus 0,2...0.7 m.
Kiht 8 Savimöllmoreen
Savimöllmoreen on halli värvusega, sisaldab jämepurdu visuaalselt 5-20 %, kihiti kuni 30- 35%.
Liustikuline moreen levib aluspõhja peal 0,1...0,85 m kihina või hoopis puudub. Pealispind on 0,4...2,85
m sügavusel, absoluutkõrgusel 27,65...30,25 m..
Kiht 8A Jämepurdmoreen
Jämepurdmoreenina eraldatud kiht koosneb liivasest savimöllist või kruusast, milles on jämepurdset
materjali ca 50 %. Eraldatud kiht esineb ala läänepoolses osas (PA26, 27, 28) maapinnast 1,2...1,65 m
sügavusel, absoluutkõrgusel 30,8...32,1 m. Kihi paksus on 0,15...0,60 m, esineb üleminekuid murenenud
lubjakiviks.
Kiht 9 Lubjakivi
Põhjaosas esineb Kesk-Ordoviitsiumi Kõrgekalda kihistu ja lõuna osas ÜlemOrdoviitsiumi Viivikonna
kihistu karbonaatkivimid (lubjakivid savikate või kukersiidi vahekihtidega). Värvuselt valkjas või
hallikas lubjakivi on keskmise kuni paksukihiline, kesktugev kuni tugev. Läätsedena on lubjakivi
ülemises osas 0,1...0,3 m paksuselt murenenud (kiht 9A).
Lubjakivi pealispind on 0,45...3,10 m sügavusel, absoluutkõrgusel vastavalt 33,90...27,40 m. Lubjakivi
läbiti maksimaalselt 3,8 m. Lubjakivi pealispinna üldine langus on kirde suunas.
6.2.2. Pinnaseveetase
Pinnasevesi oli välitööde ajal (29.-31.08.2023.a.) maapinnast 0,05...1,50 sügavusel maapinnast,
absoluutkõrgusel 28,2...31,55 m. Veetase fikseeriti puurimisele järgneval päeval. Ülejäänud
puuraukudesse vett ei kogunenud.
Alal esineb vabapinnaline veekihind, mis paikneb lubjakivi katvates kihtides. Pinnasevee liikumine
gravitatsiooniliselt uuringualalt ära toimub edelast kirdesse. Eelvoolu kõrgus on seotud idas paikneva
Mustraba veetaseme dünaamikaga. Juurdevoolu tagab lõunas ja edelas paiknev rabamassiiv ja märgatav
kõrgemal asuv veetase. Vett kandvateks kihtideks alal on täitepinnas, liiv, jämepurrurohke moreen ja
lubjakivi.
Pinnasevee tase on kõrge ja drenaaaživõimalused on keerulised. Hetkel toimub ala osaline dreenimine
läbi idas paikneva Laabi kraavi põhja suunas. Kuid kuna Laabi kraavi toitelala on väga suur,
läbilaskevõime aga piiratud, siis ei ole tema mõju veerežiimi kontrollimisel kuigivõrd suur.
6.2.3. Geoloogilised tingimused
Geotehnilised tingimused on vaadeldaval alal keerukad ja väga muutlikud. Pinnasevee tase on kõrge ja
kuivendamise võimalused eelvoolu piiratuse tõttu praktiliselt puuduvad.
Projekteeritakse elamutevahelised teed. Maapinna absoluutkõrgused 29,4...34,4 m vahemikus. 50-80 m
sammuga tehti planeeritavate teede trassidele puuraugud (PA22-PA42).
Uuringupunktide asukohad on Joonisel 1.1 ja 1.2. Pinnaste kirjeldused ja kihipaksused on geoloogilistes
tulpades Joonisel 2.8...2.14, illustreerivad pikilõiked on Joonistel 3.1...3.2. Olemasoleva Pika tänava 170
19.08.2025 8/18
Pikk tn 19 ja 19a kinnistute järgsed teed ning tehnovõrgud Töö nr 23035
Harku alevik, Harku vald, Harju maakond Road-Expert OÜ
TEEDEEHITUSLIK OSA / EELPROJEKT Seletuskirja koostas: Kert Jõeäär
m pikkusel lõigul (PA25, 26, 27) on sõidutee katteks asfalt (kiht A) 0,08...0,15 m kihina. Aluskihiks on
lubjakivikillustik (kiht K) paksusega 0,19...0,35 m.
Katendi lamamiks on savikas möll kruusaga ja vähese liivaga (kiht 2A) või muld (kiht 3). Elastsete
teekatendite projekteerimise juhendi (2001-52) tabeli L1.T1. niiskuspaikkonnab määrangul on
kirdeosas-idaosas III niiskuspaikkond (märg) ja muutub edelaosas I paikkonnaks (kuiv). Aastakümnete
jooksul tehtud ehitustööd koos maapinna tõstmisega on nimetatud määrangud muutnud ebamäärasteks.
Maapinna tõstmisega saab niiskuspaikkonna määrangut muuta.
7. PROJEKTLAHENDUS
7.1. Üldandmed
Projekteeritava tänava tehnilised andmed:
• Projekteerimise lähtetase „hea”
• Tänava liik kõrvaltänav
• Projektkiirus 30 km/h
• Sõiduradade arv 2
• Sõiduraja laius 2,5 m
• Tugipeenra laius 0,5 m
• Jalg- ja jalgrattatee laius 3,0 m
• Ohutusriba sõidutee ja jalgtee vahel 2,0 m
• Kavandatav eluiga 20 aastat
Projekteeritava tänava tehnilised andmed:
• Projekteerimise lähtetase „rahuldav”
• Tänava liik kvartalisisene tänav
• Projektkiirus 30 km/h rahuldav
• Sõiduradade arv 2
• Sõiduraja laius 2,25 m
• Tugipeenra laius 0,5 m
• Jalg- ja jalgrattatee laius 2,5 m
• Ohutusriba sõidutee ja jalgtee vahel 2,0 m
• Kavandatav eluiga 20 aastat
Projekteeritavate ristmike põhilised näitajad:
• teenindustase kavandatava perioodi lõpuks A
• kurviraadiused 7,0 m
7.2. Plaanilahendus
Projekteeritud on uusarenduse territooriumi sõiduteede ja kergliiklusteede võrgustik. Peatee rolli kannab
Pikk tänav, mis on projekteeritud kõrvaltänavana. Ristuvad tänavad Kuu tn ja Päikese tn tekitavad kokku
neli ristmiku.3Kaks neist neljaharulised ja kaks kolmeharulised t-kujulised ristmikud. Kõik ristmikud
on Pikk tänava suhtes tõstetud ehk künnistega. Künnised ja ülekäigukohad on vastavalt tähistatud
liiklusmärkide ja teekattemärgistusega. Lisaks künnistele on liikluse rahustamiseks kasutatud tee
19.08.2025 9/18
Pikk tn 19 ja 19a kinnistute järgsed teed ning tehnovõrgud Töö nr 23035
Harku alevik, Harku vald, Harju maakond Road-Expert OÜ
TEEDEEHITUSLIK OSA / EELPROJEKT Seletuskirja koostas: Kert Jõeäär
kitsendusi, millest kaks on projekteeritud Pikk tn algusesse ja lõppu ning üks Päikese tänavale. Tee
kitsendus on selline, et läbi mahub liikuma vaid üks auto korraga ning tee servad on piiritletud
äärekiviga. Piirkiirus antud territooriumil on 30 km/h. Tänavad on projekteeritud ühekihilise
asfaltbetoonkatendiga. Kvartalisiseste tänavate kurvides on laiendused projekteeritud selliselt, et kaks
sõiduautot saavad üksteisele vastusõites probleemideta mööduda. Suuremate masinate puhul on
konfliktide vältimiseks ette nähtud poole meetri laiune tugipeenar.
7.2.1. Mahasõidud
Projekteeritud asfaltkatte kokku viimisel olemasoleva maapinna/mahasõidu kõrgusarvudega võib
pikikalle olla ≤10%.
Projekteeritud mahasõitude asfaltbetoonkate viia sujuvalt kokku olemasoleva mahasõidu
asfaltbetoonkattega või mustkattega.
Projekteeritud mahasõitude asfaltbetoonkate viia kokku olemasoleva kruuskattega või pinnasega,
kasutades optimaalse terakoostisega segu.
Mahasõitude tugipeenrad ehitada optimaalse terakoostisega segust. Mahasõitude tugipeenra laius on
0,5m.
7.3. Vertikaalplaneering
Sõiduteele on projekteeritud ühepoolne põikkalle 2,5%.
Tugipeenardele on projekteeritud põikkalle 4,0%.
Jalgratta- ja jalgteele on projekteeritud ühepoolne põikkalle 2,0%.
7.4. Katend
Katendi projekteerimisel on lähtutud juhendist „Elastsete teekatendite projekteerimine“
(Transpordiamet 2023).
Katendi arvutamisel on kasutatud KAP katendi arvutamise programmi (KAP 2.00, 23.02.2017).
Katendi kasutusajaks võetud 20 aastat (vastavalt juhendile „Elastsete teekatendite projekteerimise
juhend“).
7.4.1. Projekteeritud katendikonstruktsioonid
Katendite konstruktsioonid on näidatud plaanijoonistel erinevate värvidega.
Konstruktsioon 1. Projekteeritud sõidutee katend freesitud alusel
• Asfaltkate AC 16 surf 70/100 h = 4 cm
• Olemasolev tasandusfreesitud asfaltbetoonkate hfrees = 4 cm
Konstruktsioon 2. Projekteeritud sõidutee ühekihiline ab-katend
• Asfaltkate AC 16 surf 70/100 h = 6 cm
• Killustikalus fr 32/63 kiilutud h = 30 cm
19.08.2025 10/18
Pikk tn 19 ja 19a kinnistute järgsed teed ning tehnovõrgud Töö nr 23035
Harku alevik, Harku vald, Harju maakond Road-Expert OÜ
TEEDEEHITUSLIK OSA / EELPROJEKT Seletuskirja koostas: Kert Jõeäär
• Liivalus Tm_105 h = 25 cm
• Täide Tm_65 h = 75 cm
• Olemasolev aluspinnas
Sõidutee katendi projekteerimisel on lähtutud vajalikust kõrvaltänava ja kvartalisisene tänava
elastusmoodulist 200 MPa vastavalt EVS 843 tabelile 6.18 – „Katendi parameetrid“. Ette on nähtud
ehitada katendikonstruktsioon 1,36m ulatuses külmakindlatest materjalidest. Lõikudes, kuhu jääb
muda või turvas alla, tuleb see väljakaevata.
Konstruktsioon 3. Projekteeritud jalg- ja jalgrattatee ab-katend
• Asfaltkate AC 8 surf 70/100 h = 5 cm
• Killustikalus fr 32/63 kiilutud h = 20 cm
• Liivalus Tm_105 h = 20 cm
• Täide Tm_65 h = 55 cm
• Olemasolev aluspinnas
Konstruktsioon 4. Projekteeritud mahasõidu kokkuviimine
• Sidumata segu (segu 6) h = 10 cm
• Liivalus Tm_105 h = 20 cm
• Olemasolev aluspinnas
Konstruktsioon 5. Projekteeritud tugipeenar
• Sidumata segu (segu 6) h = 6 cm
• Projekteeritud katendikonstruktsioon
Konstruktsioon 6. Projekteeritud haljasalade murukate
• Murukülv (klass II)
• Kasvualus h = 10 cm
• Täide kohalikust pinnasest (vajadusel)
Konstruktsioon 7. Projekteeritud kruuskatte taastamine
• Killustikust kate fr 0/32 h = 20 cm
• Tagasitäide olemasolevast pinnasest h = muutuv
• Projekteeritud tehnovõrk
• Olemasolev aluspinnas
7.5. Tee-ehitusmaterjalid
7.5.1. Nõuded materjalidele
MATERJALIDE
NÕUDED: Materjal
Kihi
paksus,
[cm]
Konstruktsiooni
nr Materjali minimaalsed nõuded
19.08.2025 11/18
Pikk tn 19 ja 19a kinnistute järgsed teed ning tehnovõrgud Töö nr 23035
Harku alevik, Harku vald, Harju maakond Road-Expert OÜ
TEEDEEHITUSLIK OSA / EELPROJEKT Seletuskirja koostas: Kert Jõeäär
Asfaltbetoonsegud AC 8 surf 5 3
Jalgratta-, jalg- ja kõnniteed ning
õuealad
(EVS 901-3:2021) FNaCl (45%
tardkivi)
AC 16 surf 6 1, 2
AKÖL <900
(EVS 901-3:2021) FNaCl
Killustik Paekillustik fr
32/63 20/30 2, 3 AKÖL 20 500 - 3000 (KKEJ)
Juurde-
veetavad
pinnased
Katendis
kasutatud
arvutuslik
liivalus Tm_105 20/25 2, 3
Vastavalt juhendi „Elastsete teekatendite
projekteerimine“ L2.T3-le ja
0,063mm osakesi < 7%
Täide Tm_65 55/75 2, 3
Vastavalt juhendi „Elastsete teekatendite
projekteerimine“ L2.T3-le ja
0,063mm osakesi < 7%
Tugipeenrad
sidumata segu
fr 0/31,5 [segu
nr 6 (TEKN)]
6 5 Purunemiskindlus ≤LA35 ;
külmakindlus F4 ; TEKN;
Mahasõidu
kokkuviimised
sidumata segu
fr 0/31,5 [segu
nr 6 (TEKN)]
10 4 Purunemiskindlus ≤LA35 ;
külmakindlus F4 ; TEKN;
Tm_65 nõuded – plaatsus Rootsi WLR 10...25, Sõelkõver 2...0,25mm>50%, plaatsus Vassiljev 1...7,
0,063mm osakesi < 7%
Märkused:
• Kasutatava asfaltsegu omadused ja sõelkõver peavad rahuldama EVS 901-3:2021 toodud
vastava segulehe tingimusi.
• Asfaltsegudes kasutatav filler peab rahuldama EVS 901-1:2020 nõudeid.
• Täitematerjalide ja filleri minimaalsed katsesagedused ja katsemeetodid on määratud EVS 901-
1:2020.
• AKEJ – Asfaldist katendikihtide ehitamise juhis
• KKEJ – Killustikust katendikihtide ehitamise juhis
• TEKN – Tee ehitamise kvaliteedi nõuded
• Tööde teostamisel juhinduda määrusest „Tee ehitamise kvaliteedi nõuded“.
• Asfaltbetoonkatte pikivuugid teostada kuumvuukidena. Vuukide töötlemine teostada vastavalt
juhendile „Asfaldist katendikihtide ehitamise juhis“.
• Killustikalused ehitada vastavalt juhisele „Killustikust katendikihtide ehitamise juhis“. Lubatud
ei ole kasutada sidumata segusid.
EVS-EN 13242 ja EVS-EN 13285 standardite järgi toodetud materjal või peentäitematerjalid loetakse
katendiehituseks sobivaks juhul kui osakesi tera suurusega alla 0,063mm on vähem kui 7%.
19.08.2025 12/18
Pikk tn 19 ja 19a kinnistute järgsed teed ning tehnovõrgud Töö nr 23035
Harku alevik, Harku vald, Harju maakond Road-Expert OÜ
TEEDEEHITUSLIK OSA / EELPROJEKT Seletuskirja koostas: Kert Jõeäär
7.6. Veeviimarid
7.6.1. Sademevee ära juhtimine ja kraavid
Sademeveed on juhitud sõidutee ja jalg- ja jalgratta tee vahel asuvatele haljasaladele/nõvadesse ja osati
sealt omakorda mööda drenaažitorusid immutuskraavidesse, st. et sademeveed immutatakse terve
arenduse alal kinnistu piires. Projektiga rajatavatest immutuskraavidest kinnistu põhjapoolses küljes
puudub väljavool ja vesi imbub kinnistu piires pinnasesse. Kraavide rajamisel lähtuda konstruktiivsest
lõikest Lõige 5-5.
Lisaks on projektiga ette nähtud kolme kraavi sulgemine:
Suletav kraav nr 1: Olemasolev kraav suletetakse ning täidetakse olemasoleva kohapealse pinnasega
nõlvade ülemise servani ehk kõrguseni 28.50. Kraavi otsa põhja kõrgus jääb samaks olemasoleva kraavi
põhjaga – 27.99. Projekteeritud imbkraavi nõlva ülemise serva kõrgus suletava kraavi kohal on 30.00.
Suletav kraav nr 2: Olemasolev kraav suletetakse ning täidetakse olemasoleva kohapealse pinnasega
nõlvade ülemise servani ehk kõrguseni 28.50. Kraavi otsa põhja kõrgus jääb samaks olemasoleva kraavi
põhjaga – 27.95. Projekteeritud imbkraavi nõlva ülemise serva kõrgus suletava kraavi kohal on 30.00.
Suletav kraav nr 3: Olemasolev kraav suletetakse ning täidetakse olemasoleva kohapealse pinnasega
nõlvade ülemise servani ehk kõrguseni 30.95. Kraavi otsa põhja kõrgus jääb samaks olemasoleva kraavi
põhjaga – 30.40.
Kraavide otsad viimistletakse vastavalt maaparandusrajatiste tüüpjoonistele.
7.6.2. Truubid
Projekteeritud truup ning truubi päised ehitada vastavalt tüüpjoonistele (vt „Põhitee truubi
tüüpjoonis“).
Plastikust truupidel kasutada PE või PP toru, mille rõngasjäikus min SN8.
7.7. Konstruktsioonid
Käesoleva projekti puhul ei kohaldu.
7.8. Liikluskorraldus- ja ohutusvahendid
7.8.1. Liiklusmärgid
Projekteeritud liiklusmärgid sõiduteel peavad kuuluma suurusgruppi 1. Projekteeritud liiklusmärgid
jalgratta- ja jalgteedel peavad kuuluma suurusgruppi 0. Liiklusmärkide ja viitade alused sõiduteel
valmistada alumiiniumist. Liiklusmärkide alused jalgratta- ja jalgteedel valmistada tsinkplekist.
Tekstiliste märkide tähekõrgus 150 mm. Sõiduteele paigaldatavatel liiklusmärkidel kasutada II-klassi
valgustpeegeldavat kilet. Kinnitusdetailid peavad olema tsingitud. Jalgratta- ja jalgteede liiklusmärkidel
kasutada I-klassi valgustpeegeldavat kilet.
Liiklusmärkide materjalinõuded:
Kõik liiklusmärgid, liiklusmärkide postid ja kinnitustarvikud peavad vastu pidama EVS-EN 12899-1
kirjeldatud koormustele. Minimaalsed koormuste nõuded on toodud Riigiteede liikluskorralduse juhise
tabelis II-1.4b. Vundamentide ehitamisel peab kasutama EVS-EN 206-1 nõuetele vastavat betooni.
Betooni keskkonnaklassid valida vastavalt Riigiteede liikluskorralduse juhise punktile 1.5.6. Kasutatava
liiklusmärgikile kohta tuleb esitada vastavussertifikaadid.
19.08.2025 13/18
Pikk tn 19 ja 19a kinnistute järgsed teed ning tehnovõrgud Töö nr 23035
Harku alevik, Harku vald, Harju maakond Road-Expert OÜ
TEEDEEHITUSLIK OSA / EELPROJEKT Seletuskirja koostas: Kert Jõeäär
Liiklusmärkide postid ja tarvikud:
Kõik postid peavad olema kuum-galvaniseeritud terastorud, mille mõõtmed tagavad
liikluskorraldusvahendi püsimise EN 12899 kirjeldatud koormuste korral. Kõik avatud ülemise otsaga
postid tuleb varustada vastupidavast materjalist kattega, mis takistab vee sissepääsu posti.
Liiklusmärkide paigaldamine:
Projekteeritud liiklusmärgid paigaldada vastavalt standardile EVS 613:2023 „Liiklusmärgid ja nende
kasutamine”.
Vundament peab vastu võtma EN 12899-1 kirjeldatud koormused. Liiklusmärgi konstruktsiooni võib
paigaldada betoonvundamendile, kui vundament on saavutanud 80 % tugevusest.
Enne tekstiliste liiklusmärkide tellimist, tootmist ja paigaldamist, tuleb Töövõtjal liiklusmärkide
tööjoonised kooskõlastada tellijaga.
7.8.2. Teekattemärgistus
Teekattemärgistuse projekteerimisel on lähtutud Maanteeameti juhendist „Riigiteede liikluskorralduse
juhis“.
Telgjoon ja käsimärgistusena teekattele kantavad teekattemärgistus teostada termo valuplastikuga
(TVP).
Projekteeritud teekattemärgistus paigaldada vastavalt standardile „EVS 614:2022 Teemärgised ja
nende kasutamine”.
7.9. Tehnovõrgud
Tehnovõrkude projektid asuvad eraldiseisvates köidetes.
7.10. Keskkonnakaitse
Töövõtja peab oma tegevuses lähtuma headest ehitustavadest ning ei tohi kahjustada keskkonda.
Töövõtja peab vältima saasteainete sattumist pinnasesse ja/või (põhja) vette. Kütused ja õlid peavad
olema ladustatud viisil, mis välistab võimalikud lekked. Masinate ja seadmete tankimine ei tohi toimuda
veekogule lähemal kui 50 meetrit. Töövõtja peab olema valmis hädaolukordadeks ja nende puhul
vastavalt tegutsema. Töövõtja peab koheselt Tellijat teavitama õnnetusjuhtumistest, mis võivad olla
keskkonnale ohtlikud.
Ehituse Töövõtja vastutab ehitusperioodil keskkonnakaitse eest ehitusplatsil ja sellega vahetult
piirnevail aladel vastavalt Eesti Vabariigis kehtivaile seadustele ja nõuetele ning Tellija poolt esitatud
juhistele. Tähelepanu tuleb pöörata ehitustöödel tekkivate jäätmete käitlusele. Ohtlikud jäätmed tuleb
koguda muudest jäätmetest eraldi ning üle anda ohtlike jäätmete käitlemise litsentsi omavatele
ettevõtetele.
19.08.2025 14/18
Pikk tn 19 ja 19a kinnistute järgsed teed ning tehnovõrgud Töö nr 23035
Harku alevik, Harku vald, Harju maakond Road-Expert OÜ
TEEDEEHITUSLIK OSA / EELPROJEKT Seletuskirja koostas: Kert Jõeäär
Ehitusjäätmete kogumine ja utiliseerimine on Töövõtja kohustus. Tööde piirkonnas peavad olema
prügikonteinerid ning kõik tekkivad jäätmed tuleb ladustada sinna. Jäätmete ladustamine väljaspool
selleks ettenähtud kohti on keelatud. Kõik ehitustööde ajal ajutiselt hõivatud tööpiirkonnad tuleb lepingu
lõppedes taastada nende endises seisukorras.
7.11. Maastikukujundustööd
7.11.1. Ettevalmistus ja haljastuse likvideerimine
Tee maa-ala tuleb puhastada, võsast, põõsastest, kividest, prügist jne. Likvideeritavate puude ja võsa
kännud juurida ning utiliseerida. Jäätmete utiliseerimise kohutus on Töövõtjal.
Liiklusohutuse huvides on vajalik kärpida oksi sõidutee äärsetel puudel, et tagada vajalik
nähtavuskaugus ning kõrgusgabariit. Oksad kärpida nähtavuskauguse ja kõrgusgabariidi tagamiseks
sõidutee kattest 5,5m kõrguselt.
Ehitustööde käigus vigastada saanud olemasolevad puud, hekid ja põõsad tuleb asendada sama
liiki hekkide ja põõsastega.
Istutatavad taimed peavad vastama Eesti standardile 939-2:2020.
Olemasolevad säilitatavad puud tuleb ehitustööde vältamise ajaks kaitsta.
7.11.2. Puude kaitsmine ehitustööde ajal
Puu tüve ümber siduda püstised prussid, prusside ja tüve vahele panna pehmendus (kivivill, autokummid
vms, prussidest kaitse peab ulatuma kogu tüve kõrguseni) ning jälgida, et ehitustööde käigus ei
vigastataks puu oksi. Vajadusel võib kärpida puu alumisi oksi, kuid peab säilima antud puule
iseloomulik võra kuju.
Üle 4 cm läbimõõduga juuri ei tohiks läbi raiuda. Kui sellise läbimõõduga juured jäävad kaevetööde
alasse, siis tuleb seal kaevata labidaga käsitsi.
Samuti tuleb jälgida, et ehitusseadmetega ei sõidetaks puude juurtel ega ladustataks ehitusmaterjale
sinna. Tallamise eest kaitset vajav juurestik ulatub vähemalt puu võra välisjooneni.
Kui ruumipuudus sunnib ehitusmaterjali puu alla ladustama, kaetakse koht kõigepealt ~20 cm paksuse
liiva- või kergkruusakihiga, mille peale asetatakse puidust vms materjalist restid ehitusmaterjalide
ladustamiseks.
Ehituse lõppedes koristatakse kaitsekihid. Viide: Kadi Tuul, 2006 „Linnahaljastus“.
7.11.3. Projekteeritud haljastus
Projektiga on ette nähtud haljastada tasapinnalised haljasalad murukülviga (klass II). Projektiga on ette
nähtud kraavide nõlvad haljastada murukülviga (klass III). Lubatud on kraavide nõlvade haljastamine
hüdrokülviga.
19.08.2025 15/18
Pikk tn 19 ja 19a kinnistute järgsed teed ning tehnovõrgud Töö nr 23035
Harku alevik, Harku vald, Harju maakond Road-Expert OÜ
TEEDEEHITUSLIK OSA / EELPROJEKT Seletuskirja koostas: Kert Jõeäär
Haljasalad rajada kasvualusele. Kasvualuse projekteeritud paksus on 10cm.
Kasvualuse rajamiseks on lubatud kasutada välja kaevatud kasvupinnast, kui see vastab kasvualusele
esitatud nõuetele.
Kasvualus peab olema taimekasvuks sobiv ega tohi sisaldada ohtlikke aineid üle piirmäära. Kasvumuld
ei tohi sisaldada prahti, kive ega mitmeaastasi juur-umbrohte. Kasvumuld ei tohi olla liiga tihke ja
kõvastunud: peab surumisel kergesti lagunema.
Uue kasvualuse rajamisel tuleb kasvualuse materjal laotada eelnevalt planeeritud pinnale, seda veidi
aluspinda segades, et ei tekkiks järsku üleminekut eri kihtide vahel. Tihedatel liigniisketel savimaadel
võib puude ja põõsaste kasvualuse rajada aluspinnase peale, et vesi ei koguneks istutusauku, kuid
kasvualus ei tohi olla väiksema mahuga kui nõutud.
Töövõtja peab kindlustama, et kasvualuse valminud osadel ei liiguks rasked masinad. Juhul kui
kasvualus on liigselt tihenenud, tuleb see kobestada ja taastada. Muru külviks tuleb kasutada kodumaise
või naaberriikide päritoluga seemneid, millel on head idanemis- ja katvusomadused.
Ehitustööde käigus rikutud või kahjustatud haljasalad tuleb taastada.
8. TÖÖDE TEOSTAMINE
8.1. Üldosa
Ehitustööde teostamisel peab järgima projekti kooskõlastustel ja/või ehitusloal märgitud kolmandate
osapoolte võimalike täiendavate tingimustega.
8.2. Ettevalmistustööd
Ehitustööde tegemise ajaks on vajalik objekt nõuetekohaselt märkide ja viitadega tähistada.
Enne põhiliste ehitustööde algust tuleb välja märkida kõik iseloomulikud tee-elemendid. Väljamärgitud
punktid tuleks looduses kindlustada ning vastavalt vajadusele ka taastada või uuesti välja märkida.
Kõik tööde korrektseks teostamiseks vajalikud ajutised laoplatsid kuuluvad lahutamatu osana iga
konkreetse tööetapi juurde. Ajutiste laoplatside asukohad on Töövõtja kohustatud ise enne tööde algust
leidma ning vajadusel sõlmima nende kasutamiseks vajalikud kokkulepped. Vajadusel tuleb ajutiste
laoplatside asukohad täpsustada ja/või kooskõlastada täiendavalt Tellija või omavalitsusega enne
ehitustööde algust. Kasutuskõlblikud lammutus saadused anda üle tee valdajale, ülejääk utiliseerida
vastavalt jäätmekäitlusseadusele.
Töövõtja peab hoolitsema, et ehitustööde käigus teostataks kõik seaduste ja määrustega määratud
ülevaatused ja kontrollid vastavate ametiisikute poolt. Kontrollidest tuleb eelnevalt Tellijat teavitada,
kuid mitte vähem kui 1 tööpäev ette, et tema esindaja võiks ülevaatustest osa võtta.
Tööde alustamisel tuleb informeerida tehnovõrkude valdajaid ja vajadusel täpsustada tehnovõrkude
täpne asukoht surfimise teel.
19.08.2025 16/18
Pikk tn 19 ja 19a kinnistute järgsed teed ning tehnovõrgud Töö nr 23035
Harku alevik, Harku vald, Harju maakond Road-Expert OÜ
TEEDEEHITUSLIK OSA / EELPROJEKT Seletuskirja koostas: Kert Jõeäär
Kaevamistöid võib alustada vastavate lubade olemasolul ning tööde teostamine peab olema kooskõlas
tööde tellijaga. Tööde teostamisel tehnovõrkude kaitsetsoonis tuleb kinni pidada kehtestatud
ohutustehnilistest ja võrguvaldajate poolt eraldi välja toodud nõuetest.
Tööde läbiviimisel ja ehituskaeviku piirestamisel lähtuda määrusest “Nõuded ajutisele
liikluskorraldusele”.
Ehitusaegse liikluskorralduse eest vastutab Töövõtja. Enne ehitustööde alustamist kohustub koostama
Töövõtja ehitusaegse liikluskorralduse skeemi, mille kohustub kooskõlastama Transpordiameti
liikluskorralduse spetsialistiga. Ehitusaegne liikluskorraldus ehitusobjektil peab vastama kooskõlastatud
skeemile.
Töövõtja peab tagama ehitusperioodil kodanikele ligipääsu oma kinnistutele, mis piirnevad
ehitusobjektiga.
8.2.1. Teetööde lühikirjeldus
• Veenduda vajalike lubade, kooskõlastuste ja pädevuste olemasolus.
• Objekt tähistada nõuetekohaselt (infotahvlid, ajutine liikluskorraldus).
• Ehitustööde teostamisel erakinnistutelt lähtuda maaomanike poolt seatud kooskõlastuste
tingimustest.
• Märkida välja tee geomeetrilised elemendid.
• Eemaldada likvideeritavad puud, võsa, kännud, kivid.
• Freesida asfaltkate (freespuru kasutamine leppida kokku tellijaga).
• Teostada väljakaeved. Eemaldada projekteeritud katendite alt kasvupinnas ja mitte sobiv pinnas.
Projektis on arvestatud 0,3 m paksuse kasvupinnase kihiga. Profileerida ja tihendada olemasolev
aluspinnas.
• Ehitada välja tehnovõrkude projektlahendused.
• Paigaldada, profileerida ja tihendada täitepinnas.
• Rajada dreenkihid ja liivalused.
• Rajada killustikalused.
• Paigaldada äärekivid.
• Paigaldada sillutiskivid.
• Paigaldada asfaltbetoonkate.
• Paigaldada ja tihendada peenra katte materjal. Planeerida nõlvad, külvata muru. Kindlustada
nõlvad, kus see on ette nähtud.
• Teostada haljastus ja heakorrastus.
• Teostada kattemärgistus ning paigaldada liikluskorraldusvahendid.
• Puhastada teemaa-ala.
• Kontrollmõõtmised, tööde üleandmine, objekti valmimine.
8.2.2. Nõuded mulde ja aluse tihendustegurile ning kandevõimele
Kandevõime:
19.08.2025 17/18
Pikk tn 19 ja 19a kinnistute järgsed teed ning tehnovõrgud Töö nr 23035
Harku alevik, Harku vald, Harju maakond Road-Expert OÜ
TEEDEEHITUSLIK OSA / EELPROJEKT Seletuskirja koostas: Kert Jõeäär
• Elastsusmoodul mõõdetuna teel LOADMAN- või INSPECTOR-tüüpi seadmega tihendatud
dreenkihi peal peab olema ≥ 65 MPa.
• Elastsusmoodul mõõdetuna teel LOADMAN- või INSPECTOR-tüüpi seadmega tihendatud
killustikaluse peal peab olema sõiduteel ning teenindava transpordiga kõnniteel ≥ 170 MPa.
• Elastsusmoodul mõõdetuna teel LOADMAN- või INSPECTOR-tüüpi seadmega tihendatud
killustikaluse peal peab olema kõnniteel, jalgratta- ja jalgteel ≥ 140 MPa.
• Elastsusmoodul mõõdetuna teel LOADMAN- või INSPECTOR-tüüpi seadmega tihendatud
killustikaluse peal peab olema eraldussaarel ≥ 120 MPa.
• Tugipeenarde elastsusmoodul mõõdetuna LOADMAN- või INSPECTOR-tüüpi seadmega
tugipeenra keskelt peab olema ≥130 MPa.
Tihendustegur:
• tihendustegur katendi põhjast kuni 0,4 m sügavuseni ≥ 0,98 (valik vastavalt TEKN lisa 6)
• tihendustegur katendi põhjast üle 0,4 m sügavusel ≥ 0,96 (valik vastavalt TEKN lisa 6)
9. HOOLDUSJUHEND
Avalikult kasutatava tee seisundinõuded on määratud Majandus- ja taristuministri määrusega „Tee
seisundinõuded. Lähtuda tuleb määruse kehtivast redaktsioonist. Avalikult kasutatava tee omanik või
teehoiu eest vastutav isik on kohustatud hoidma tee seisunditaseme nõuetele vastavas seisukorras.
Käesolevas seletuskirjas on tähelepanu juhitud projekti peamistele eripäradele, muus osas kehtivad
üldised hooldamise tingimused, mis tulenevad tee omaniku ja töövõtja vahelisest lepingust.
Konkreetsete, ehitusöödel kasutatud toodete (truubid, kaevud, valgustid, liiklusmärgid vms)
tootjapoolsed hooldus- ja kasutusjuhendid tuleb töövõtjal edastada Tellijale. Toodete hooldamisel
lähtuda edastatud hooldusjuhendistest.
9.1. Suvihoole
• Kattele sattunud kemikaalid, mis võivad kahjustada nii teekatet kui ka markeeringut, tuleb
eemaldada koheselt, et vältida võimalikke katte kahjustusi.
• Kattele tekkinud mehaanilised vigastused tuleb koheselt kaitsta, kas asfalteerimise, pindamise
vmt teel, et vältida kahjustuse süvenemist alumistesse katendikihtidesse.
• Peenarde kaitsmiseks tuleb neid regulaarselt hooldada, s.t. tuleb uuendada peenarde
pealispinda materjali lisamise ning profileerimisega. Kui peenral on näha uhtumise märke,
tuleb need koheselt likvideerida vältimaks peenra ulatuslikumat kahjustumist (täita peenra
materjaliga ning tihendada).
• Liiklusmärgid peavad olema puhtad, loetavad ja reflekteeruvad.
• Truupide olukorda (ummistumist, otsade kindlustust) tuleb süstemaatiliselt kontrollida, eriti
pärast tugevaid vihmaperioode.
• Teostada süstemaatiliselt kontrolle kraavide seisukorra hindamiseks. Avastatud puudused
likvideerida.
• Betoonkivist sillutisega ohutussaartel teostada vajadusel umbrohutõrjet.
• Teostada süstemaatiliselt kontrolle sademevee restluukide seisukorra hindamiseks. Avastatud
puudused (ummistused vms) likvideerida koheselt.
19.08.2025 18/18
Pikk tn 19 ja 19a kinnistute järgsed teed ning tehnovõrgud Töö nr 23035
Harku alevik, Harku vald, Harju maakond Road-Expert OÜ
TEEDEEHITUSLIK OSA / EELPROJEKT Seletuskirja koostas: Kert Jõeäär
9.2. Talihoole
• Sulaperioodil ei tohi lund lükata hange kindlustamata teepeenardele, kuna see takistab vee
äravoolu sõiduteelt ning nõrgestab tugipeenra kandevõimet.
• Ülekäigukohad ja kergliiklusteed tuleb hoida lumevabad.
• Vältida lume ladustamist eraldusribadele.
• Lumevallide lükkamisel teedelt peab jälgima, et lükatav lumi ja tehnika ei vigastaks
liikluskorraldusvahendeid. Vigastatud liikluskorraldusvahendid tuleb koheselt asendada.
• Betoonkividega äärekivide juures lume lükkamisel, tuleb vältida äärekivide kahjustamist.
9.3. Liikluskorraldusvahendite hoole
• Liiklusmärgid peavad olema puhtad, loetavad ja reflekteeruvad, 95% märgi pinnast peab olema
vigastusteta. Juhul kui nimetatud tingimused ei ole täidetud, tuleb märgid korrastada või välja
vahetada.
• Kattemärgistus tuleb uuendada, kui selle peegeldusvõime langeb alla lubatud normi.
9.4. Haljastuse hoole
• Muru tuleb regulaarselt niita. Niitmiskõrgus valida vastavalt muru klassile juhendist
„Riigiteede haljastustööde juhis“.
• Tee peenardel paikneva murukamara kõrgus ei tohi takistada vee äravoolu tee pinnalt.
Vajadusel tuleb peenrad profileerida, et tagada vee äravool.
• Kraavides tuleb teostada niitmist sagedusega, mis takistab kraavide kinni kasvamise.
• Kõnniteede kohalt tuleb puu oksad likvideerida, kui nende kõrgus on alla 300 cm maapinnast;
• Sõiduteede kohalt tuleb puu oksad likvideerida, kui nende kõrgus on alla 500 cm maapinnast;
• Teedelt ei tohi lükata soolatud lund teeäärsetele puudele ja põõsastele.
Seletuskirja koostaja: Kert Jõeäär (Allkirjastatud digitaalselt)
Kuupäev: 19.08.2025
TSOON 2 - Päike
TSOON 4 - Kuu
TSOON 3 - Kuu
P1.1
2xJk1.1
Päikese tänav
Pikk tänav
K uu tänav
Pikk tänav
K uu tänav
Kuu tänav
Päikese tänav
TSOON 1 - Päike
rida Harilik vaher 'Crimson King'
rida Harilik vaher 'Crimson King'
Punapaju 'Nana'
Harilik sirel 'Madame Lemoine'
rida Harilik vaher 'Drummondii'
Punapaju 'Nana'
rida Harilik vaher 'Drummondii'
rida Harilik vaher 'Crimson King'
Punapaju 'Nana'
rida Harilik vaher 'Drummondii'
PK1.1 P1.1
PK1.1
P1.1
P1.2
PK1.2
2xJk1.1
PK1.1
PK1.1P1.1
K1.1
TK1
K2
R1
PL1.1
PL1.1
PL1.1
P2
P2
P2
P2
4xJk1.1
PK1.1
PK1.1
K3
K3
VP
KP
T
LT
P1.2
Jk1.2
PK1.2
R2
KS
TK2
K1.2 P1.2
PK1.2
MURUALA PALLIMÄNGUDEKS
jms
P1.2PK1.2
4xJk1.2
PL1.2 PL1.2
R3 K1.2
LK
TK3
Kelgumägi, h=1,6m
Puitastmed
PL1.1
Säiliv puu (arukask, nr 173). Juurestikukaitsevööndis teostada
kaevetöid (puu tüvest r=9,28 m) käsitsi
Si - 20tk
Si - 20tk
Si - 2tk
PaP - 6tk
PaP - 9tk
PaP - 33tk
PaP - 45tk
PaP - 4tk
PaP - 15tk
VaC - 4tk reas
VaC - 12tk reas
Va - 7tk reas
Va - 5tk reas
Va - 5tk reas
Va - 9tk reas
VaC - 12tk reas
PaP - 14tk
PaP - 9tk
KaT - 32tk
KaT - 18tk
PaP - 6tk
KaT - 28tk
KaT - 24tk
14
13
OCT1 06
top
top
MSF00 1 top
top 3D
_A
14 14
14
15
15
15
13 13
13
13
17 17
17
17
17 17
17
17 17
17
17 17
18 18
18 18
18
18
13 13
1414 14
14 14
14 14
17
12
15
15
13 13
13
1212
12 12
17
17 17 17
17 17
17 17
17 17
15
13
12
17 17
17
17 17
4
3
5
1
2
6
7
2
18 14
PINK
PIN K
PINK
PINK
0.71
2.00
R2.00
16.00
30.95
2.00
R 10.00
R10.00
R5.00
R11.50
R5.00
R 13.00
R9.50
R7.50
R18.00
R24.00
E T
E T
ET
ET
ET
E T
E T
E T
E T
E T
E T
E T E T E T
E T
E T
E
TE
TE
T
E
T
E
T
E
T
E
T
E
T
2
Torupiire pum pla
kaitseks
PER SPEKVIIVN
E
BU SSIPEATU
S
945a
945a
PERSPEKVIIVN E
BU SSIPEATU
S
945 a
945a
Lahendatakse eraldi
projektiga
1.67 0.89
2.45
6.50
0.84
4.00
10.00
3.50
15.00
1.50
2.50
2.50 R
4.00
R4.00
R8.00
R8.00
R 4.00
R8.00
R 8.00
R4.00
R 4.00
R80.00
R80.00 R47.50
1.31
3.50
946c
6.00
20
R4.00
R 4.00
R5.00
6.00
6.00
6.00
R3.00
977
977
1:3
1:3
1:3
1:3
1:3
1:1,5
1:1,5
1:3
PK 0+
00
PK 0+ 25
PK 0+50
PK 0+75
PK 1+00
PK 1+25
PK 1+ 50
PK 1+ 75
PK 2+ 00
PK 2+ 25
6.00
R 4.00
R2.00
R 2.00
2.50
2.50
5.00 4.38
1.00
3.90 5.00
15.00
2.50
6.00
6.00
6.00
6.00
1
0.80%
0.70%
0.92%
1.03%
0.28%
-0.76%
-2.19%
-2.91%
0.77%
PK 0+ 80
PK 1+ 00
PK 1+ 20
PK 1+ 40
PK 1+ 60
PK 1+ 80
PK 2
+ 00
PK 2
+ 05
946c
943
2.00
±0.00 = abs.k.33.30
±0.00 = abs.k.34.30
±0.00 = abs.k.34.30
±0.00 = abs.k.35.00
±0.00 = abs.k.34.90
±0.00 = abs.k.34.50
±0.00 = abs.k.33.90
±0.00 = abs.k.33.30
±0.00 = abs.k.32.10
±0.00 = abs.k.31.50 ±0.00 =
abs.k.31.20
±0.00 = abs.k.31.30±0.00 =
abs.k.31.40
±0.00 = abs.k.31.60
±0.00 = abs.k.33.50
±0.00 = abs.k.31.50
±0.00 = abs.k.31.30
±0.00 = abs.k.30.70
±0.00 = abs.k.30.70
±0.00 = abs.k.30.00
±0.00 = abs.k.30.00
±0.00 = abs.k.29.70
±0.00 = abs.k.29.60
±0.00 = abs.k.31.00
±0.00 = abs.k.30.40
±0.00 = abs.k.30.00
±0.00 = abs.k.30.90
±0.00 = abs.k.31.10
±0.00 = abs.k.30.60
±0.00 = abs.k.30.50 ±0.00 =
abs.k.30.00
±0.00 = abs.k.30.00
±0.00 = abs.k.29.80
±0.00 = abs.k.29.80
±0.00 = abs.k.29.80
±0.00 = abs.k.29.80
Lai kraav 1: mahutavus 370 m³
Lai kraav 2: mahutavus 250 m³
3.00
3.502.50
3.00 2.00
2.00 3.00
2.505.00 3.50
2.50 2.00
2.50 4.50 2.50
3.50
3.50 2.50
2.50 2.50
2.00
5.40
5.33
5.45
5.40 5.69
42.71
SIRGE L=63.9 0+63.9
R=500.0
R=500.0 0+96.1
SIRGE L=41.5
SIRGE L=41.5 1+37.6
R=90.0
R=90.01+95.2
SIRGE L=32.0
SIRGE L=32.02+27.2 R=50.0
R=50.02+42.8 SIRGE L=36.4
SIRGE L=36.42+79.2 R=40.0
R=40.0 3+05.8
SIRGE L=22.5
SIRGE L=22.5 3+28.2
R=40.0
R=40.0 3+62.3
SIRGE L=75.3
SIRGE L=75.3 4+37.7 R=70.0
R=70.0 4+59.1 SIRGE L=45.8
SIRGE L=45.8 5+04.9 R=200.0
R=200.0 5+37.7
SIRGE L=77.6
SIRGE L=77.6 6+15.3 R=90.0
R=90.0 6+53.4
SIRGE L=44.0
SIRGE L=190.9 1+90.9 R=27.0
R=27.0 2+33.0 SIRGE L=65.8
0+00 0+25
0+50 0+75
1+00 1+25
1+50 1+75 2+00
2+25
2+50 2+75
2+99
0+00
0+25
0+50
0+75
1+00
1+25
1+50 1+75
2+00
2+25 2+50
2+75
3+00
3+25
3+50 3+75 4+00 4+25 4+50
4+75
5+00
5+25
5+50
5+75
6+00
6+25
6+5 0
6+7 5
6+9 7
0+00 0+25
0+50 0+75
1+00
1+25
1+50 1+75
2+00 2+25
2+50
2+75
3+00 3+25 3+50 3+75 4+00
4+2 5
4+ 50
4+ 75
4+ 84
SIR GE
L= 10
1.7 1+
01 .7
R= 25
.0
R=25.01+40.4 SIRGE L=111.0
SIRGE L=111.02+51.4 R=25.0
R=25.0 2+89.0
SIRGE L=107.1
SIRGE L=107.1 3+96.2 R=25.0
R=25.0 4+35.7SIRGE L=48.5
R18.5
R18.5
R20.0
R20.0
0+00 0+25
0+50
0+75 1+00 1+25 1+50
1+75 2+
00 2+
25 2+
50 2+
74
SIRGE L=46.10+46.1 R=22.0
R=22.0 0+80.3
SIRGE L=80.2
SIRGE L=80.2 1+60.5 R=22.0
R=22.0 1+98.3SIRGE L=75.4
4.50 2.50
2.50 2.00 2.50
Pikk tn
Pikk tn
Pikk tn
Pikk tn
Pikk tn
Pikk tn
Kuu tn
Kuu tn
Kuu tn
Kuu tn
Päikese tn L1
Päikese tn L1
Päikese tn L2
Päikese tn L2
Päikese tn L2
Tööm ahtude piir
M uru RK
28.38
0+00 0+25
0+50 0+75
1+00 1+25
1+50 1+75
2+00
2+25 2+50
2+75 3+00
3+25 3+50
3+75 4+00
4+25 4+50
4+75
5+005+255+505+756+006+256+506+757+007+257+507+758+008+258+508+759+009+259+50
9+ 75
10 +0
0 10
+2 5
10 +5
0 10
+7 5
11 +0
0 11
+2 5
11 +5
0 11
+7 5
12+00
12+25
12+50 12+57
30.20
28.75
28.58
28.40
28.40
29.71
33.04
33.88
33.94
???
30.05
29.87
29.70
29.52
29.35
29.17
28.99
28.82
28.72 28.68
28.64 28.60
28.51 28.40
28.40 28.40
28.40 28.40
28.40 28.41
28.54
28.68
28.81
28.94
29.07
29.21
29.34
29.47
29.61
29.77
30.02
30.27
30.52
30.77
31.02
31.27
31.52
31.77
32.02
32.27
32.52
32.77
33.02
33.20
33.38
33.55
33.73 33.89
33.91
33.94
3.00
R4.00 R4.00
4.10
4.90
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1 M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1 M8-VV1
M8-VV1 M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1M8-VV1
M8-VV1
M8-VV1M8-VV1
M8-VV1
M8-VV1M8-VV1
M8-VV1
M8-VV1 M8-VV1
M8-VV1 M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1 M8-VV1
M5-VV4
M5-VV4
M5-VV4
M5-VV4M5-VV4M5-VV4
M5-VV4 M5-VV4
M5-VV4
M5-VV4
M5-VV4
M5-VV4
M5-VV4
M5-VV4
M5-VV3M5-VV3
M5-VV3
M5-VV3
M5-VV3 M5-VV3
M5-VV3
M6-VV2
M6-VV2
M6-VV2
M6-VV2
M6-ÜV1
M6-ÜV1+ÜV2
M6-ÜV2
M6-ÜV2
M6-ÜV2
M6-ÜV1
M6-ÜV1
M6-ÜV1
M6-ÜV1 M6-ÜV1
M6-ÜV1
M6-ÜV1
M6-ÜV2
M5-VV4
M6-ÜV1+ÜV2
Suletav kraav nr 3
Suletav kraav nr 2
Suletav kraav nr 1
0+00
0+25
0+50
0+62
0+000+250+50
0+ 75
0+ 88
0+00 0+25
0+38
0+00 0+25
0+46
N
S
W
E
Road Expert
/allkirjastatud digitaalselt/
/allkirjastatud digitaalselt/
/allkirjastatud digitaalselt/
/allkirjastatud digitaalselt/
Road-Expert OÜ Reg kood 14449962 Tel +372 5665 0034 [email protected] www.roadexpert.ee
Tellija:
Projekti nimetus
Objekti asukoht
Joonise nimetus
Projekti number Projekti staadium Joonise number Joonise mõõtkava Kuupäev
Geoalus Autor: Töö number: Mõõdistatud:
Geodeetiline alusplaan on koostatud
25.08.2025
koordinaatsüsteemis ja kõrgussüsteemis
Projektijuht
Projekteerija
Projekteerija
Ivar Kartusov
Meelis Kreevan
Kert Jõeäär
Pikk tn 19 ja 19a kinnistute DP järgsed teed ning tehnovõrgud
Harku alevik, Harku vald, Harju maakond
Asendiplaan
23035 Eelprojekt TL-4-03 1:500
EXACT Geomark AS 10031 07.2023
Astlanda Kinnisvara OÜ Reg kood 11660165 [email protected]
L-EST 97 EH2000
Märkused: 1. Kraavide ja tiikide mahutavuse hindamiseks on eeldus, et kraavidest imbumise kiirus peab olema vähemalt 5 l/s. Sellisel juhul kraavide
ja tiikide puhverdav maht peab olema vähemalt 1350 m³ 2. Seni koostatud projektlahenduse kraavide ja tiikide summaarne mahutavus on hetkel 1550 m³. Seejuures pole siia juurde arvestatud
kitsaid kraave, mis arenduse perimeetril kulgevad.
Haljastuse hinnangu tingmärgid (OÜ Visioon Haljastus töö nr 454/2023)
Haljastusliku objekti number II väärtusklassi haljastus III väärtusklassi haljastus IV väärtusklassi hljastus V väärtusklassi haljastus
Alusplaanile juurde lisatud puu
Känd/ ei eksisteeri
TL osa tingmärgid Katastriüksuse piir Detailplaneeringu järgne krundi piir
Maapealne hoonestusala (vastavalt detailplaneeringule) Projekteeritud tee telgjoon Projekteeritud tee servajooned Projekteeritud sõidutee äärekivi 150x290 (h=8 cm) Projekteeritud kõnnitee äärekivi 80x200 (h=0 cm) Projekteeritud tugipeenar Projekteeritud sõidutee künnis Projekteeritud liiklusmärgi post Projekteeritud truup Projekteeritud restkaev (ümmargune restluuk)
Projekteeritud sõidutee katend freesitud alusel
Projekteeritud sõidutee ühekihiline ab-katend
Projekteeritud jalg- ja jalgrattatee ab-katend
Projekteeritud graniitkividest katend
Projekteeritud mahasõidu kokkuviimine
Projekteeritud haljasalade murukate
Projekteeritud kruuskatte taastamine
Varem projekteeritud objektid (SWECO Projekt AS, töö nr 21240-013)
Koostamisel olev kinnistute sisene projektlahendus
Likvideeritavad objektid
Projekteeritud kraav ELV osa tingmärgid (3INS OÜ töö nr 24014)
Projekteeritud tänavavalgustuse juhtimiskilp
Perspektiivne Elektrilevi paigaldatav ja projekteeritav liitumiskilp
Pumpla automaatika kilp
Projekteeritud ülekäiguraja valgusti
Projekteeritud tänavavalgusti
Projekteeritud pargivalgusti
Projekteeritud mänguväljaku- ja tegevusala valgusti
Projekteeritud korvpalli- ja võrkplatsi valgusti
Projekteeritud MP õhuliini masti tõmmits
MA osa tingmärgid (K-Projekt AS, töö nr 23078)
Alade tsoneeringu piirjoon
Kinnistu piir
Puu juurestiku kaitsevööndi piir EVS 939:2020, p 6.2.2 tabel 6.1 "Juurestiku kaitseala arvutamine"
Projekteeritud tiigid/nõvad
Projekteeritud künkad/kelgumäed
Projekteeritud asfaltkatend
Projekteeritud graniitsõelmekatend
Projekteeritud liivakatend
Projekteeritud looduslike koosluste ala (kõrge heinane ala)
Projekteeritud kõrreliste ala (KaT)
Projekteeritud haljasalad
Projekteeritud puitääris
Projekteeritud tumeda lehestikuga puu - Harilik vaher 'Crimson King' (VaC)
Projekteeritud heleda/kirju lehestikuga puu - Harilik vaher 'Drummondii' (Va)
Projekteeritud põõsas - Harilik sirel 'Madame Lemoine' (Si)
Projekteeritud põõsas - Punapaju 'Nana' (PaP)
Projekteeritud maakivi
Projekteeritud rattahoidik
Projekteeritud seljatoega pargipink
Projekteeritud seljatoeta lihtne pargipink
Projekteeritud prügikast
Projekteeritud pikniku komplekt
Projekteeritud väikevormi (vt MA-8-01) tähisK2
±0.00 = abs.k.33.30
±0.00 = abs.k.34.30
±0.00 = abs.k.34.30
±0.00 = abs.k.35.00
±0.00 = abs.k.34.90
±0.00 = abs.k.34.50
±0.00 = abs.k.33.90
±0.00 = abs.k.33.30
±0.00 = abs.k.32.10
±0.00 = abs.k.31.50 ±0.00 =
abs.k.31.20
±0.00 = abs.k.31.30±0.00 =
abs.k.31.40
±0.00 = abs.k.31.60
±0.00 = abs.k.33.50
±0.00 = abs.k.31.50
±0.00 = abs.k.31.30
±0.00 = abs.k.30.70
±0.00 = abs.k.30.70
±0.00 = abs.k.30.00
±0.00 = abs.k.30.00
±0.00 = abs.k.29.70
±0.00 = abs.k.29.60
±0.00 = abs.k.31.00
±0.00 = abs.k.30.40
±0.00 = abs.k.30.00
±0.00 = abs.k.30.90
±0.00 = abs.k.31.10
±0.00 = abs.k.30.60
±0.00 = abs.k.30.50 ±0.00 =
abs.k.30.00
±0.00 = abs.k.30.00
±0.00 = abs.k.29.80
±0.00 = abs.k.29.80
±0.00 = abs.k.29.80
±0.00 = abs.k.29.80
Lai kraav 1: mahutavus 370 m³
Lai kraav 2: mahutavus 250 m³
3.00
3.502.50
3.00 2.00
2.00 3.00
2.505.00 3.50
2.50 2.00
2.50 4.50 2.50
3.50
3.50 2.50
2.50 2.50
2.00
5.40
5.33
5.45
5.40 5.69
42.71
R18.5
R18.5
R20.0
R20.0
4.50 2.50
2.50 2.00 2.50
Pikk tn
Pikk tn
Pikk tn
Pikk tn
Pikk tn
Pikk tn
Kuu tn
Kuu tn
Kuu tn
Kuu tn
Päikese tn L1
Päikese tn L1
Päikese tn L2
Päikese tn L2
Päikese tn L2
Tööm ahtude piir
M uru RK
29.60
M uru RK
28.38
M uru RK
29.36
M uru RK
29.25
30.20
28.75
28.58
28.40
28.40
29.71
33.04
33.88
33.94
???
30.05
29.87
29.70
29.52
29.35
29.17
28.99
28.82
28.72 28.68
28.64 28.60
28.51 28.40
28.40 28.40
28.40 28.40
28.40 28.41
28.54
28.68
28.81
28.94
29.07
29.21
29.34
29.47
29.61
29.77
30.02
30.27
30.52
30.77
31.02
31.27
31.52
31.77
32.02
32.27
32.52
32.77
33.02
33.20
33.38
33.55
33.73 33.89
33.91
33.94
3.00
R4.00 R4.00
4.10
4.90
Suletav kraav nr 3
Suletav kraav nr 2
Suletav kraav nr 1
28.54
28.43
1:3,0
1:3,0
1:3,0
1:3,0
-33.29%
1:3,0
1:3,0
1:3 ,0
TSOON 2 - Päike
TSOON 4 - Kuu
TSOON 3 - Kuu
P1.1
2xJk1.1
Päikese tänav
Pikk tänav
K uu tänav
Pikk tänav
K uu tänav
Kuu tänav
Päikese tänav
TSOON 1 - Päike
PK1.1 P1.1
PK1.1
P1.1
P1.2
PK1.2
2xJk1.1
PK1.1
PK1.1P1.1
K1.1
TK1
K2
R1
PL1.1
PL1.1
PL1.1
P2
P2
P2
P2
4xJk1.1
PK1.1
PK1.1
K3
K3
VP
KP
T
LT
P1.2
Jk1.2
PK1.2
R2
KS
TK2
K1.2 P1.2
PK1.2
MURUALA PALLIMÄNGUDEKS
jms
P1.2PK1.2
4xJk1.2
PL1.2 PL1.2
R3 K1.2
LK
TK3
Kelgumägi, h=1,6m
Puitastmed
PL1.1
Säiliv puu (arukask, nr 173). Juurestikukaitsevööndis teostada
kaevetöid (puu tüvest r=9,28 m) käsitsi
Si - 20tk
Si - 20tk
Si - 2tk
PaP - 6tk
PaP - 9tk
PaP - 33tk
PaP - 45tk
PaP - 4tk
PaP - 15tk
VaC - 4tk reas
VaC - 12tk reas
Va - 7tk reas
Va - 5tk reas
Va - 5tk reas
Va - 9tk reas
VaC - 12tk reas
PaP - 14tk
PaP - 9tk
KaT - 32tk
KaT - 18tk
PaP - 6tk
KaT - 28tk
KaT - 24tk
D N
40+40/180
D N
40+40/180
DN40+40/180
DN40+40/180
DN50+50/225
DN200/355
DN200/355 D
N 50+50/225
D N
50+50/225
D N
200/355
D N
200/355
D N
100/225
D N
80/180
DN65+65/250 DN50+50/225
D N
40+40/180
DN80+80/280
DN65+65/250
DN80+80/280
D N
40+40/180
D N
40+40/180
D N
50+50/225
DN50+50/225 DN200/355
DN40+40/180
DN40+40/180
DN40+40/180
D N
200/355
D N
40+40/180
DN150/280
DN15 0/2
80
D N
40+40/180
D N
40+40/180
DN40+40/180
D N
40+40/180
D N
50+50/225
D N
32+32/180
D N
32+32/180
D N
32+32/180
DN80+80/280
DN50+50/225
D N
32+32/180
D N
32+32/180
DN65+65/250
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/ 2/
2/
2/
W 1.1
W 1.1
W 1.1
W 1.1
W1.1 W1.1 W1.1 W1.1 W1.1 W1.1
Projekteeritud tänavavalgustuse juhtimiskilp
W1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W1.1
W1.1
W1.1 W1.1 W1.1 W1.1 W1.1 W1.1 W1.1
W1.1
W1.1 W1.1
W1.1
W1.1
W1.1
W1.1
W1.1
W1.1
W1.1
W1.1
W1.1
W1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W1.1 W1.1 W1.1 W1.1 W1.1 W1.1
W1.1 W1.1 W1.1 W1.1 W1.1 W1.1
W1.1 W1.1 W1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W1.1 W1.1
.
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W1.1W1.1 W1.1W1.1W1.1W1.1W1.1W1.1W1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W1.1 W1.1 W1.1 W1.1 W1.1 W1.1 W1.1 W1.1 W1.1
W 1.1
W 1.1
W 1.1
W 1.1
W1.1
W1.1
W1.1
W1.1
W1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W1.1
W1.1
W1.1
W1.1
W1.1W1.1W1.1W1.1W1.1W1.1
W1.1
W 1.1
Pumpla liitumiskilp, elektrilevi töövõtus
Pumpla automaatika kilp
SK-2 KKS2
SK-3 KKS2
SK-4 KKS2
SK-6 KKS2
SK-7 KKS2
SK-8 KKS2
SK-9 KKS2
SK-15 KKS2
SK-12 KKS2
SK-13 KKS2
SK-14 KKS2
SK-16 KKS2
SK-36 KKS2
SK-26 KKS2
SK-27 KKS2
SK-28 KKS2
SK-30 KKS2
SK-29 KKS2
SK-31 KKS2
SK-33 KKS2
SK-34 KKS2
SK-23 KKS2
SK-22 KKS2
SK-5 KKS2
SK-1 KKS2
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W1.1
W1.1
W 1.1
W1.1
2/ 2/ 2/ 2/
2/ 2/
2/ 2/
2/ 2/
2/ 2/ 2/ 2/
2/ 2/
2/
2/ 2/
2/
2/
2/
2/
2/ 2/
2/
2/
2/
2/
2/ 2/
2/ 2/
2/ 2/
2/
2/
2/ 2/
2/ 2/ 2/ 2/ 2/
2/ 2/ 2/
2/ 2/ 2/ 2/ 2/
2/
2/
2/ 2/ 2/ 2/ 2/
2/2/2/2/2/
2/ 2/
2/
2/ 2/
2/ 2/
2/ 2/
2/ 2/
2/
2/
2/ 2/
2/2/2/2/ 2/2/2/ 2/
2/
2/
2/
2/
2/ 2/
2/ 2/
2/ 2/
2/ 2/
2/ 2/
2/
2/ 2/ 2/ 2/ 2/
SK-10 KKS2
SK-11 KKS2
SK-17 KKS2
SK-18 KKS2
SK-19 KKS2
SK-20 KKS2
SK-21 KKS2
SK-24 KKS2
SK-25 KKS2
SK-35 KKS2
SK-32 KKS2
W1.1
W1.1
W1.1
W1.1
W1.1
W 1.1
W 1.1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1 M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1 M8-VV1
M8-VV1 M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1M8-VV1
M8-VV1
M8-VV1M8-VV1
M8-VV1
M8-VV1M8-VV1
M8-VV1
M8-VV1 M8-VV1
M8-VV1 M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1 M8-VV1
M5-VV4
M5-VV4
M5-VV4
M5-VV4M5-VV4M5-VV4
M5-VV4 M5-VV4
M5-VV4
M5-VV4
M5-VV4
M5-VV4
M5-VV4
M5-VV4
M5-VV3M5-VV3
M5-VV3
M5-VV3
M5-VV3 M5-VV3
M5-VV3
M6-VV2
M6-VV2
M6-VV2
M6-VV2
M6-ÜV1
M6-ÜV1+ÜV2
M6-ÜV2
M6-ÜV2
M6-ÜV2
M6-ÜV1
M6-ÜV1
M6-ÜV1
M6-ÜV1 M6-ÜV1
M6-ÜV1
M6-ÜV1
M6-ÜV2
M5-VV4
M6-ÜV1+ÜV2
E T
E T
ET
ET
ET
E T
E T
E T
E T
E T
E T
E T E T E T
E T
E T
E
TE
TE
T
E
T
E
T
E
T
E
T
E
T
2
Torupiire pum pla
kaitseks
PER SPEKVIIVN
E
BU SSIPEATU
S
PERSPEKVIIVN E
BU SSIPEATU
S
Lahendatakse eraldi
projektiga
1:3
1:3
1:3
1:3
1:3
1:1,5
1:1,5
1:3
1
0.80%
0.70%
0.92%
1.03%
0.28%
-0.76%
-2.19%
-2.91%
0.77%
K1
V1
V1
V1
K1
K1
K1
SK1
SK1
V1
V1
K1
K1
SK1V1 K1
V1
K1
K1
V1
V1
V1
K1
K1
K1
K1
SK1
SK1
KS1
KS1
VRK-01
Ø560 29.30 (29.30)
27.75 28.21 1.55
V1
V1
V1
V1
V1
V1
V1
V1
V1
V1
V1
V1 V1
V1
V1
V1
V1
V1
V1
Ühendussiiber AS Tallinna Vesi torustikuga
tavaolukorras suletud
V1
V1
V1
V1
V1
V1
V1
V1
V1
V1
V1
V1
V1
V1
V1
V1
V1
SK1
SK1
SK1
V1
V1
V1
V1
V1
SK1
SK1
SK1
V1
O l.ol kaev
välja vahetada!
SK1
SK1
V1
V1
V1
V1
SK1
SK1
SK1
SK1
SK1
1 2
V1
V1
V1
V1
V1
V1
1 2
Kanalisatsioonitorustik soojustada!
De110 L=6.0m i=0.1373
O l.ol kaev
välja vahetada!
1
2
SK1
SK1
SK1
K
K
K
K
K
De315 L=36.5m i=0.0057
K
K
K De315 L=50.2m
i=0.0024
K
De315 L=10.4m
i=0.0029
K
K
K
K
K
De315 L=40.4m
i=0.0025
K
K
De315 L=20.2m
i=0.0025
K K
K K
K K
K 1
2
1 2
3
K
K
K
K
De315 L=35.4mi=0.0034
1 2
1 23
45
1 2
1
2 3
SK1
SK1
SK1
SK1
SK1
SK1
SK1
SK1
SK1
De110 L=17.8m
i=0.0096
1 2
1
2 1
2
1
2
1
2 1
2
3 4
1 2
1 2
Torustik soojustada!
1
2
1
2
1 2
1 23 4
5
6
1
2 3
1
2
1 2
3 4
1 2
3
1 2
3 4
1
2
1 2
1
2 3
1
2 3
1
2
1
2
OK-09 Ø400 28.62 (28.49)
27.53 27.53 1.09
1
2
3
1
2
O lem
asolev kaev
likvideerida! O lem
asolevad
torustikud om avahel ühendada
Proj. tänavavalgustuse juhtimiskilp
W1.1
W1.1
W1.1
W1.1
W1.1
W1.1
W1.1
W1.1
W1.1
W1.1
SK-5
/
SK-7
/
SK-8
/
/
/
/
/
/
W1.1
W1.1
W1.1
N
E
S
W
W 1.1
W1.1
F1-2 L2
8|1 m
F1-18 L3 8|2,5 m
8|2,5 m
F2-2 L2 8|1 m
F2-1 L1
8|1 m
F2-10 L1 8|1 m
6 m
F2-3 L3
6 m
F2-3 9 L
3
6 m
F2-11 L2
F2-27 L3 4 m
F2-36 L3 4 m
F2-38 L2 4 m
F2 -29
L2 4 m
F2-28 L1 4 m
F2-30 L3 4 m
F2-37 L1 6 m
F2-35 L2 6 m
F2-33 L3 4 m
F2-3 2 L
2 4 m
F2-31 L1 4 m
F2-34 L14 m
6 m
F2-4 L1
F2-7 L1 8|1 m
F2 -25
L1 8|1
m
F2-26 L2 8|1 m
6 m
F1-22 L1
6 m
F2-6 L3
6 m
F2 -5
L2
6 m
F2-8 L2
6 m
F2-9 L3
6 m
F1 -1
L1
6 m
F1-13 L1
F2-12 L3 8|1 m
F2-13 L1
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X XMPS
+K05
+K03
+K01
+K06
+K04
+K02
KPS I
KPS II
2W 1
2W 1
2W 1
2W 1
2W1
2W 1
2W 1
2W 1
2W 1
2W1
2W1
2W1
2W1
2W1
2W1
2W1
1W1
1W1
2W 1
2W 1
2W 1
2W 1
1W 2
1W2
1W2 1W2
1W2
1W2
1W2
1W2
1W2
1W2
1W2
1W2
1W2
1W2
1W2
1W2
1W2
1W 2
1W 2
1W 2
2 1
2 1
2 1
2 1
2 1
1 2
1 2
1 2
1 2
1W 1
1W 1
1W1
1
T2
T2
T1
T1
T1T2
T2
T2
T2
T2
T2
T2
T1
T1
T1
T1
T1
T1
T1
T1
T2
T2
T1
T1
T1
T1
T1
T1
T1
T1
T1
T1
T1
T1
T1
T1
T1
T1
T1
T1
T1
T1
T1
T1
T1T1
T2
T2
T2
T2
T2
T2
T2
T2
T2
T2
T2
T2
T2
T2
T2
T2
T2
T2
T2
T2
T2
T2
T1
T1
T2
T2
T1
T1 T2
T2
T2
T2
T1
T1
T1
T2 T1
T1
T1
T1
T1
T1
T2
T2
T2
T2
T2
90°
65/160 L=13,0
14
13
OCT1 06
top
top
MSF001 top
top 3D
_A
14 14
14
15
15
15
13 13
13
13
17 17
17
17
17 17
17
17 17
17
17 17
18 18
18 18
18
18
13 13
1414 14
14 14
14 14
17
12
15
15
13 13
13
1212
12 12
17
17 17 17
17 17
17 17
17 17
15
13
12
17 17
17
17 17
4
3
5
1
2
6
7
2
18 14
PINK
PIN K
PINK
PINK
0.71
2.00
R2.00
16.00
30.95
2.00
R 10.00
R10.00
R5.00
R11.50
R5.00
R 13.00
R9.50
R7.50
R18.00
R24.00
1W 1
1W1 1W1 1W1 1W1 1W1 1W1
1W1
1W 1
1W 1
2W1
1W 1
1W 1
1W 1
1W 1
1W 1
1W 1
1W 1
1W1
1W 1
1W 1
1W1 1W1 1W1 1W1 1W1
1W 1
W1 1W1
1W 1
2W1
1W 1
1W 1
1W 1
1W 1
1W 1
1W11W1
2W1
1W 1
1W 1
1W 1
1W 1
1W 1
1W 1
1W 1
1W 1
1W1 1W1 1W1 1W1 1W1 1W1
2N2U2V2W 1W
1V
1U
+KP -E3.2+KPS I
+.K01+.K03+.K05+.K07+.K09
-SA1.1
-SD1
+AU T I +TR
-T1
+M PS
-M EB
+M P
-E3.1 -SD3
-SD2
-SA2.1
1W1 1W1
1W1 1W1
1W1
2W 1
1W1 1W1
1W1 1W1
1W1
1W 1
1W1
1W 1
1W 1
1W 1
1W 1
1W 1
1W 1
1W 1
1W 1
1W 1
1W 1
2W1
1W 1
1W 1
2W1 2W1 2W1 2W1
1W 1
1W11W11W1
1W1
2W 1
3W 1
3W 1
3W 1
3W 1
3W 1
3W16W1
1W1 1W1 1W1 1W1 1W1 1W1 1W1 1W1 1W1 1W1
2
1
1
K1 K1
K1 2
K1 K1 1
2
K1 K1
13
K1
12
13 K1 K1 K1
2
K1 K1 K1 K1
12
K1 K1
K1
K1 K1
K1 K1
1
K1
K1
K1
K1
2 1
K1
2 1
K1
K1
2 1
3
1 242
13
K1
K1
32
K1
K1
K1
K1
1
2
1
2
K1 K1 K1 K1 K1 13
K1 K1
K1 K1
1
1 2
K1 K1 K1
13K1 K1 12K1 K1 K1
13
K1
31 4 1
1
V1 → de110
V1
V1 →
de110
3 1
3 1
3 1
V1 V1
V1 V1
→ de110
1 2
2 1
2 1
1 2 2 1
V11 2
V1 V1 V1→de110
2 1
V1 →de110
3 1
V1 V1 →de110
2 1
1
1
1 3
1 2
V1
1
2
1
2
3
V1 V1 V1 V1→de110
12
V1 V1 V1 V1→de110
13
V1 V1
→ de110
1 2
V1 V1
V1 V1
V1 V1
V1
3 1
V1 V1
V1 V1
1 2
V1 V1 →de1101
2
V1 V1 V1 →de1101 3 3 1
V1 V1 V1
2 1 1 3
V1 V1 V1 V1 V1
2
2 1 1 3 1
1
3
V1 V1
V1 V1
→ de110
3
2
V1 V1 12V1 V1→de110
13V1 V1 12V1 131 2
2 1
3
2 1
V1 V1
V1 →
de110 1
2
V1
1
de160
de160
K1s
D 1
D 1
D 1
D 1
2
3
K21K21K21
K21 K21
K21 K21
K21
K21 K21 K21
K21
K21
K21
K21
K21
K21 K21
K21 K21
K2 1
K2 1
K2 1
K2 1
K2 1
K2 1
K2 1
K21
K21
K21
K2 K2
K2 K2
K2 K2
1 2
2
1
K2 K2
K2
3
K1 K1
K1 K1
K1 K1
K1 1
3
3 1
D12 1
2 1
12
K1 K1
K1 K1
1 2
1
D1
D1
D1
D1
D1
K1
K1
K1
K1 K1 K1
K1 K1
K1 K1
1 3
K1 K1
K1 K1
2
1 23
1 2
3 1
2
3 1
2
3 1
22 1
2
→de110
3 1
2
3 1
2
1 2
1 2
2 1
2
3 1
2
2 1
2
V1 V1
V1 →
de110 1
2
312
3 1
2
K1 K1 K1
12
3 1
21 2
2 1
2 4
1 2
2 1
2
← de110
1 3
212
3
1 2
2
1 22
1 2
2
1 2
K1 1 2
3 1
2 2
1
2
1
1
2
K1 K1 12
K1 K1 K1 K1 13
→ de110
3 1
2
2 1
2
3 2
2 1
2 2
1 2
3 1
2
2 1
2
3 1
2
3 2
1
212
1 2
212
→ de110
2 1
2 4
1 2
3 1
2
2 1
2 4
1 2
4 1
2 2
1 2
421
3 2
1
312
→ de110
4 1
2 2
1 2
3 1
2
4 1
2 2
1 2
2 1
2 4
1 2
2 1
2
312
212
1 2
1 2
3 1
2
2 1
2 4
1 2
3 1
2
3 1
2
2
1 2
V1 → de110
2 1
3
2 1
V1
2
1
2
V1
2
1
2
2
K1
3
1
2
K1
3
1
2
K1
2
3
1
2
→de63
1
2
V1
3
1
2 K1
3
1
2
2 1
V1
V1
V1
V1
V1
K1 K1 K1
K1
12
3 1
2
K21
K21
K21
K2 K2
K2 K2
K2
K21
K21
K21
K21
2
1
K1
1 2
1
2 3
1
12
3
1 2 3
2 3
V1
V1
V1
V1
V1
V1
V1
1 2
K21 K21
K21 1
2
K1s
K1s
K1s
K1s
K1s
K1s
K1s
K1s
K1s
1 2
3
← de110
K1
2
1
D1 D1 D1
V1
V1
V1
← de110
1 2
V1 V1
→ de110
2 1
V1
22 1
V1
← de110
2 1
← de110
1 2
1 2
K1 K1
K1 K1
K1 1
2
V1 →de110 12
1 2→de110 12
2 1
V1
V1
V1 →
de110
2 1
V1 → de110
2 1
V1
2
1
K1
2 12 1
2 1
3
→ de110
→de110 →de110
← de110
→de110 →de110
→de110
K1 s
K1s
K1s
K1s
K1s
K1s
K1s
K1s
V1
←PE de110 L=16.4
i=0.0034
K1
1 2
←de40
←de40
V1 V1 →
PE de110 L=24.9 i=0.0080
2
2
←de40
12
3 1
2 3
21
→ PE de40 L=8.7
i=0.01953 1
1 22
→de40
← de40
←de110
← PE de110
L= 7.2
i= 0.0221
K1 K1V1 V1 →PE de 10 L=24.3 i=0.0019
→ PE de40 L=
9.3 i=
0.0083 3
2 12
1 1D1 D1 D1 D1 D1 D1 D1 D1
4 1
D1
2
2
1
1 2
→ de32
→ de32
→ de40
← de110
→de110
→ de40
→ de40
→ de40
→ de40
→de40
→de32
← de32 ← de32 ← de32
← de40
→ de32
K
1
2
1
12
V1 V1 V1 V V1 V1 V1 →
PE de110 L=82.4 i=0.0160
1 2
1
2
12
2
1
1
2
→de110
1
2 1
2
D1
12
2 1
12
←de32
← de110
1 2
← de110
1 2
← de110
V1 → PE de110 L=16.5 i=0.0080
V1 2
1
← de40
1 1
2
1 2
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D1
D1
D1
D1
D 1
2 3 12
1
D 1
D 1
3
1 2
1 2
V1
← PE de110
L=12.4 i=0.0031
2 1
1 3
2 1
2 2
1 3
2 1 2
2
V1
2 1 2 1
V1
V1
2 1
V1
V1
V1
2
1
V1
2
1
2
1
2
1
de1 011 2 de110
de110
de110
de110 de110
1 2
3
2 1
2 1
1 2
V1
1 2
2 1
3
K1 K1
3 1
V1 V1
← PE de110 L=
23.3 i= 0.0019
1 3 V1
→PE de40 L=12.3
i=0.01682 12
de110 1 2
PE de110
L=18.3 i=0.0080
PE de110
L=24.4 i=0.0072
D1 D1 D1 D1 D1
D1 D1 D1 D1 D1 D1
12
1 2
PE de63
L=9.5 i=0.0109
PE de110
L=59.8 i=0.0115
PE de110
L=78.2 i=0.0061
K2
K2 K2
K2
V1
V1
V1
V1
V1
V
1 2
1
2
1
2 3
V1 1
2
V1
V1
1 2
V1 1
2
V1
1 2
1
2 1
3
V1
1
2
1 2
2
PE de110
L=16.1 i=0.0999
PE de110
L=77.2 i=0.0062
PE de110
L=13.5 i=0.0445
PE de110
L=20.1 i=0.0304
PE de110
L=17.5 i=0.0029
PE de110
L=25.2 i=0.0329
K2
K2
K2
K2
K2 K2
N
S
W
E
Road Expert
/allkirjastatud digitaalselt/
/allkirjastatud digitaalselt/
/allkirjastatud digitaalselt/
/allkirjastatud digitaalselt/
Road-Expert OÜ Reg kood 14449962 Tel +372 5665 0034 [email protected] www.roadexpert.ee
Tellija:
Projekti nimetus
Objekti asukoht
Joonise nimetus
Projekti number Projekti staadium Joonise number Joonise mõõtkava Kuupäev
Geoalus Autor: Töö number: Mõõdistatud:
Geodeetiline alusplaan on koostatud
25.08.2025
koordinaatsüsteemis ja kõrgussüsteemis
Projektijuht
Projekteerija
Projekteerija
Ivar Kartusov
Meelis Kreevan
Kert Jõeäär
Pikk tn 19 ja 19a kinnistute DP järgsed teed ning tehnovõrgud
Harku alevik, Harku vald, Harju maakond
Tehnovõrkude koondplaan
23035 Eelprojekt TL-5-01 1:500
EXACT Geomark AS 10031 07.2023
Astlanda Kinnisvara OÜ Reg kood 11660165 [email protected]
L-EST 97 EH2000
ELV osa tingmärgid (3INS OÜ, töö nr 24014)VKV osa tingmärgid (VP Projekt OÜ, töö nr 202324)
Haljastuse hinnangu tingmärgid (OÜ Visioon Haljastus töö nr 454/2023)
Haljastusliku objekti number II väärtusklassi haljastus III väärtusklassi haljastus IV väärtusklassi hljastus V väärtusklassi haljastus
Alusplaanile juurde lisatud puu
Känd/ ei eksisteeri
TL osa tingmärgid Katastriüksuse piir Detailplaneeringu järgne krundi piir Maapealne hoonestusala (vastavalt detailplaneeringule) Projekteeritud tee telgjoon Projekteeritud tee servajooned Projekteeritud sõidutee äärekivi 150x290 (h=8 cm) Projekteeritud kõnnitee äärekivi 80x200 (h=0 cm) Projekteeritud tugipeenar Projekteeritud sõidutee künnis Projekteeritud liiklusmärgi post Projekteeritud truup Projekteeritud restkaev (ümmargune restluuk) Projekteeritud sõidutee katend freesitud alusel
Projekteeritud sõidutee ühekihiline ab-katend
Projekteeritud jalg- ja jalgrattatee ab-katend
Projekteeritud graniitkividest katend
Projekteeritud mahasõidu kokkuviimine
Projekteeritud haljasalade murukate
Varem projekteeritud objektid (SWECO Projekt AS, töö nr 21240-013)
Koostamisel olev kinnistute sisene projektlahendus
Likvideeritavad objektid
Projekteeritud kraav
Projekteeritud maa-alune kaugküttetorustik
SVV osa tingmärgid (OÜ Soojatooja, töö nr 2396)
MA osa tingmärgid (K-Projekt AS, töö nr 23078)
Alade tsoneeringu piirjoon
Kinnistu piir
Puu juurestiku kaitsevööndi piir EVS 939:2020, p 6.2.2 tabel 6.1 "Juurestiku kaitseala arvutamine"
Projekteeritud tiigid/nõvad
Projekteeritud künkad/kelgumäed
Projekteeritud asfaltkatend
Projekteeritud graniitsõelmekatend
Projekteeritud liivakatend
Projekteeritud looduslike koosluste ala (kõrge heinane ala)
Projekteeritud kõrreliste ala (KaT)
Projekteeritud haljasalad
Projekteeritud puitääris
Projekteeritud tumeda lehestikuga puu - Harilik vaher 'Crimson King' (VaC)
Projekteeritud heleda/kirju lehestikuga puu - Harilik vaher 'Drummondii' (Va)
Projekteeritud põõsas - Harilik sirel 'Madame Lemoine' (Si)
Projekteeritud põõsas - Punapaju 'Nana' (PaP)
Projekteeritud maakivi
Projekteeritud rattahoidik
Projekteeritud seljatoega pargipink
Projekteeritud seljatoeta lihtne pargipink
Projekteeritud prügikast
Projekteeritud pikniku komplekt
Projekteeritud väikevormi (vt MA-8-01) tähisK2
Olemasolev sidekanalisatsioon Olemasolev keskpingekaabel Olemasolev madalpingekaabel Olemasolev valgustuspost
Perspektiivne Elektrilevi paigaldatav ja projekteeritav liitumiskilp, kilbi värvus RAL7016
x- kaablikaitsetorude arv
Projekteeritud tänavavalgustuse juhtimiskilp, kilbi värvus RAL7016
Projekteeritud valgustuse kaabelliinW1.1 W1.1 W1.1
XW1 XW1 XW1 Projekteeritud MP kaabelliin (X - kaablite arv)
Projekteeritud ülekäiguraja valgusti, 6m mastil
Projekteeritud tänavavalgusti 8m mastil, 1,0m konsool
Projekteeritud pargivalgusti, 5m mastil, ühe valgustiga
Projekteeritud korvpalli- ja võrkpalliplatsi valgusti, 6m mastil, ühe valgustiga
Projekteeritud mänguväljaku- ja tegevusala valgusti, 5m mastil, ühe valgustiga
Pumpla automaatika kilp
Projekteeritud sidekanalisatsiooni kaev, KKS2 täiskaev, Telia asendusrajatis
Projekteeritud sidekanalisatsioon, Telia asendusrajatis, kaablikaitsetoru 2xØ100 UPOTEL PVC, katekooria A 4,8mm2/ 2/ 2/ 2/
Projekteeritud sidekanalisatsiooni pallmarker
Likvideeritav objektX X X X X X
/ Projekteeritud MP õhuliini masti tõmmits
Projekteeritud sidekanalisatsiooni kaev, KKS2 täiskaev Projekteeritud sidekanalisatsioon, kaablikaitsetoru Ø100 UPOTEL PVC, katekooria A 4,8mm
SK-x KKS2
Projekteeritud sidekaevu markeering
Projekteeritud sidekanalisatsioon, kaablikaitsetoru 2xØ100 UPOTEL PVC, katekooria A 4,8mm2/ 2/ 2/ 2/
Kanalisatsiooni vaatluskaev Survekanalisatsiooni sõlm Sademeveveekanalisatsiooni väljalask Sademeveekanalisatsiooni vaatluskaev Drenaaži vaatluskaev Projekteeritud hüdrant Veesõlm
Projekteeritud kanalisatsioon K1s K1s Projekteeritud survekanalisatsioon
Projekteeritud veetoru
Likvideeritav torustik
Projekteeritud sademeveekanalisatsioon
Projekteeritud drenaaž Perspektiivne kinnistute sademeveekanalisatsioon
Projekteeritud veetoru etapilise ehitamise võimaldamiseks
Proj. 21 kV kaabel (eesmine nr on kaablite arv) Proj. 0.4 kV kaabel (eesmine nr on kaablite arv)
Proj. jaotus- ja liitumiskilp (reservtoruga)
Proj. reservtoru
Stromtec töö nr. 24-201 (projekti tellija Enefit AS) tingmärgid:
Lõige 1-1
30.50 31.00 31.50 32.00 32.50 33.00
33.50 34.00 34.50 35.00
Lõige 4-4
28.50 29.00
29.50 30.00 30.50 31.00 31.50 32.00
Lõige 2-2
29.00 29.50 30.00 30.50
31.00 31.50 32.00 32.50 33.00
olol. maapind
0.500.502.383.00
olol. maapind
2.50 2.00 0.50 4.50 0.50
2.50%2.00% 2.00% 2.50%-4.00%-4.00% 2.00% -4.00%
-20.00%20.00%
-50.00% -20.00%20.00% 2.00%
Projekteeritud valgustuse kaabelliin
Projekteeritud sidekanalisatsioon
Projekteeritud veetoru
Projekteeritud kanalisatsioon
Projekteeritud elektrikaabelliin
(Elektrilevi)
1.00 0.53 0.97 2.59 0.80 8.10
Lõige 3-3
28.00 28.50 29.00 29.50 30.00 30.50 31.00 31.50 32.00
-2.50%2.00% 2.00% 2.50%
-4.00%-4.00% 2.00% -4.00%
-50.00% -50.00% -50.00%
-20.00%20.00%50.00%
-2.50%2.00% 2.00% 2.50%
-4.00%-4.00% 2.00% -4.00%
-5.10%
-50.00%-50.00% -50.00%
50.00%
Projekteeritud elektrikaabelliin
(Elektrilevi)
1.00 0.60 1.05 2.10 0.75 0.75 4.60 3.15
Projekteeritud valgustuse kaabelliin
Projekteeritud sidekanalisatsioon
Projekteeritud küttetorustik
Projekteeritud veetoru
Projekteeritud kanalisatsioon
Projekteeritud drenaaž
1.41 1.51 2.33 0.75 0.75 4.01 5.24
Projekteeritud küttetorustikProjekteeritud
valgustuse kaabelliin
Projekteeritud sidekanalisatsioon
Projekteeritud drenaaž
Projekteeritud kanalisatsioon
Projekteeritud veetoru etapilise ehituse võimaldamiseks
3.00 2.00 0.50 5.00 0.50
2.50 2.00 0.50 4.50 0.50
KONSTRUKTSIOON 3 KONSTRUKTSIOON 2
olol. maapind perspektiivne maapind
perspektiivne maapind
KONSTRUKTSIOON 3 KONSTRUKTSIOON 2
perspektiivne maapind perspektiivne maapind
KONSTRUKTSIOON 3 KONSTRUKTSIOON 2
perspektiivne maapind perspektiivne maapind
KONSTRUKTSIOON 3Projekteeritud kanalisatsioon Projekteeritud
veetoru
Projekteeritud valgustuse kaabelliin Projekteeritud
sidekanalisatsioon, Telia asendusrajatis
KONSTRUKTSIOON 1
-20.00%20.00%
LÕIGE 5-5
26.50 27.00 27.50 28.00 28.50
29.00 29.50 30.00 30.50
3.506.40 6.40
1:1,5 1:1,51:41:4
olol. maapind olol. maapind
3. 00 2.003.00 2.505.00 3.50
2.50
2.00
2.50 4.50 2.50
3.50
3.50 2.50
2.50 2.50
2.00
5.40
5.33
5.45
5.40
5.69
42 .71
0+ 00
0+ 25
0+ 50
0+ 75
1+ 00
1+ 25
1+ 50
1+ 75
2+0 0
2+25
2+50
2+75
2+99
0+00 0+25
0+50 0+75 1+00 1+25 1+50
1+75
2+00
2+25
2+50
2+75
3+00
3+25
3+5 0
3+ 75
4+ 00
4+2 5
4+ 50
4+ 75
5+ 00
5+ 25
5+ 50
5+ 75
0+00
0+25
0+50
0+75
1+00
1+25
1+50
1+75
2+00
2+25
2+50
2+75
3+ 00
3+ 25
3+5 0
3+7 5
4+ 00
4+2 5
4+50
4+75
4+84
R18.5
R18.5
0+00
0+25
0+50
0+7 5
1+0 0
1+2 5
1+5 0
1+ 75
2+00
2+25
2+50
2+74
4.502.50
2.50 2.00
2.50
Pikk tn
Pikk tn
Pi kk
tn
Pik k t
n
Pikk tn
Kuu tn
Ku u t
n
Kuu tn
Ku u
tn
Päikese tn L1
Pä ike
se tn
L 1
Päikese tn L2
Päikese tn L2
Pä ike
se tn
L2
29.50
29.60 29.70 29.80
29.90 29.90
29.90
30.00 30.10
30.20
30.30
30.40 30.50
30.60
30.70
30.70
30.70
30.80
30.90
31.00
31.10
31.20
31.30 31.40
31.50
31.50
31.50
31.60
31.70
31.80 31.90
32.00
32.10
32 .2
032.30
32 .40
32.40
32 .40
32 .50
32 .60
32 .70
32.80
32.90 33.0033.1033.2033.3033.4033.5033.6033.7033.8033.90
31.00
31.00
31.10
31.10 31.20
31.20
31.30
31.30
31.40
31.40
31.50
31.5031.60
31.60
31.60
31.70
31.80
31.90
32.00
32.10
32.20
32.30
32.40
32.40
32.50
32 .50
32.60
32 .60
32.70
32 .70
32 .80
32.80
32 .90
32 .90
33 .00
33 .0
0 33
.1 0
33.10
33 .2
0
33.20
33.30
33 .3
0 33
.4 0
33.40
33.50
33 .5
0 33
.6 0
33.60
33 .7
0
33.70
33.80
33 .8
0 33
.9 0
33.90
34.00
34 .0
0
34.10
34 .10
34 .20
34 .20
29.60
29.60
29.70
29.70
29.80
29.80
29.90
30.00
30 .10
30 .2
0
30 .3
0
30 .4
0
30 .5
0
30 .6
0
30 .7
0
30 .8
0
30 .9
0
31 .0
0
31 .1
0 31
.2 0
31 .30
31 .4
0 31
.5 0
31 .6
0 31
.7 0
31 .8
0 31
.9 0
32 .0
0 32
.1 0
32 .2
0 32
.30
29.70
29.70
29.80
29.80
29.90
29.90
29.90
30.00
30.00
30.00
30.10
30.20
30.30
30.40
30.50
30.60
30.70
30.70
30.80
30.80
33.40
33.50
34 .30
34 .30
30.90
29.80
30 .00
29.702 9.70
29.80
29.80 29.90
32.30
32.30
32.40
32.50
32.60
32.70
32.8032.9033.0033.1033.2033.3033.4033.5033.6033.70
32.20
32.1032.10
32.20
32.20
32 .20
31.9031.90
32.00
31 .9
0
32.00
32.50
29 .40
29 .50
29.60 29.60
29.60
29.70
29.70 29.70
29 .8
0 29
.9 0
30 .0
0 30
.1 0
30 .2
0
30 .30
30 .4
0
30 .5
0
30 .6
0
30 .7
0
30 .8
0
30 .9
0
31 .0
0 31
.10 31
.20 31
.3 0
31 .40
31.50
31.60
31.70 31.80
31.90
32.00
32 .10
30 .90
30.90
31 .0
0
31 .00
31 .1
0
31 .10
31 .2
0
31 .2
0
31 .30
31 .3
0
31 .4
0
31 .4
0
31 .5
0
31 .5
031 .60
31 .6
0
31.60
31 .70
31 .80
31 .90
32 .00
32 .10
32 .20
32 .3
0
32.40
32 .4
0
32 .5
0
32.50
32 .6
0
32.60
32 .7
0
32.70
32.80
32 .8032
.90
32.90
33.00
33.00
33.10
33.10
33.20
33.20
33.30
33.30
33.40
33.40
33.50
33.50
33.60
33.60
33.70
33.70
33.80
33.80
33.90
33.90
34.00
34.00
34.10
34.10
30.80 30.80 30.90
29.50
29.50
29.60 29.70
29.80 29.90
30.00
30.10
30.20
30.30
30.40
30.50
30.60
30.70
30.80
30.90
31.00
31.10
31.20
31.30
31.40
31.50
31.60
31.70
31.80
31.90
29 .6
0
29 .60
29 .7
0
29.70
29 .8
0
29.80
29.90
29 .9
0
30 .0
0
30.00
30.00
30 .1
0
30 .2
0
30 .3
0
30 .40
30.50 30.60
30.70
30.70
30.6030.60 30.70
29.70
29.70
29 .6
0 29.60 29.70
29 .7
0
29.60
31.30
31.30
31.40
30 .50 30.5030 .6
0
Muru RK 29.60
Muru RK 29.36
Muru RK 29.25
31.3031.30
31.40
31.30 31.40
33.9033.90
34.10
29.3029.30
29.40
29 .40
29.40
29.50
29.50 29.60 29.60
29.70
29.70
29.80
32.20
32 .50
0+ 00
0+ 25
0+ 50
0+ 75
1+ 00
1+ 25
1+ 50
3+75
4+00
4+25
4+50
4+75
5+25
5+50
5+75
6+00
6+25
6+50
6+75
7+00
7+25
7+50
7+75
8+00
8+25
8+50
8+75
11+50
11+75
12 +0
0
12 +2
5
12 +5
0 12
+5 7
30.20
29.71
33.88
33.94
???
30.05
29.87
29.70
29.52
29.35
29.17
28.40
28.40
28.40
28.40
28.40
28.54
28.68
28.81
28.94
29.07
29.21
29.34
29.47
29.61
29.77
30.02
30.27
30.52
30.77
31.02
33.55
33.73
33.89
33.91
33.94
3.00
R4.00
R4.00
4. 10
4.90
644 AIA tn
64 4AIA tn
Ü
644 AIA tn
64 4AIA tn
Ü
30.10
Pikk tn
Pi k tn
Pi kk
tn
Pik k t
n
Pikk tn
Kuu tn
Ku u t
n
Kuu tn
Ku u
tn
Päikese tn L1
Pä ike
se tn
L 1
Päi ese tn L2
Päikese tn L2
Pä ike
se tn
L2
33.80
33.60
32.60
32.60
33.90 34.00
34.10 34.20
34.30
34 .20
32 .3032 .4032 .5032 .6032 .7032.8032.9033.00
30.60
30.10
30.00
29.90
29.80
29.70
29.60
29.40
29.40
29.50
29.50
30.80
29 .20
29 .30
29 .40
29 .50
29 .60
29 .7
0
30.10
Suletav kraav nr 3
28.83
28.95
29.00
29.10
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.0030.00
30.0030.00
30.00
30.00
29.25
28.42
29.09
29.20
29.48
29.42
30.26 30.26
30.29 30.70
29.51
29.42
28.82
30.00
28.40
30.00
30.4030.50 30.95
31 .0
0
31.00
31 .10
31 .2
0
31 .3
0 31
.4 0
31 .50
31 .6
0 31
.7 0
31 .8
0 31
.9 0
32 .0
0 32
.1 0
32 .2
0
32 .3
0 32
.4 0
32 .50
32 .6
0
32 .70
32 .80
32 .9
0
33 .0
0
33 .1
0
33 .2
0
33 .30
33 .40
33 .50
33 .60
33 .70
31 .1
0
31 .2
0
31 .3
0 31
.4 0
31 .5
0
31 .60
31 .7
0 31
.8 0
31 .9
0
32 .0
0
32 .1
0
32 .2
0
32 .3
0
32 .4
0
32 .50
32 .60
32 .7
0 32
.80 32
.9 0
33 .0
0 33
.10 33
.20 33
.30 33
.40 33
.50
33 .60
32 .50
32 .60
32 .70
32.80
32.4032.5032.6032 .7
0
32 .8
0
32 .9
0 33
.0 0
31.0031.1031.2031.3031.4031.50
31.40
31.50
31 .60
31 .7
0 31
.8 0
31.90
32.0032 .10
32.2032 .3032
.40
32.50
32.60
32.70
32.80
32 .4
032 .5
032 .6
032 .7
032 .8
032 .9
033 .0
0
31 .5
0 31
.6 031
.7031 .8
0 31
.9 0
32 .0
0 32
.1 0
32 .2032
.3 0
32 .4
0
32 .50
32 .60
32 .70
32 .8
0
32 .9
0
33 .0
0
31.1031 .20
31 .30
31 .40
31 .50
31 .60
31 .70
31 .80
31 .90
32 .00
32 .10
31.1031.1031 .20
31.20
31 .30
31.30
31.40
31 .40
31 .50
31 .50
31 .60
31 .60
31 .70
31 .70
31 .80
31 .90
32.00
31.00
31.00
31.10
31.10
31.20
31.20
31 .30
31.30
31 .40
31.40
31.50
31.50
31.60
31.60
31.70
31.70
31.80
31.90
32.00
31.00
31.10
31.20
31.30
31.40
30 .6
0
30.60
30.603 0.6
0
30 .7
0
30 .7
0
30 .8
0
30 .8
0
30 .90
30 .90
31 .00
31.00
31 .10
31 .10
31 .2
0
31 .2
031.30
31.30
31 .40
31.40
31.50
31 .50
31.60
30 .1
0
30 .20
30 .2
0
30.30
30 .3
0
30 .40
30 .4
0
30.5030 .50
30 .5
0
30 .5
0
30 .6
0
30 .70
30.80
30 .80
30.80
30.90
31.00
31.10 31.20 31.30
29 .70
29 .80
29 .8
0
29 .8
0
29.90
29 .90
30 .00
30 .00
30 .00
30 .1
0 30
.1 0
30 .10
30.10
30 .1
0
30.20
29.90
30.00
30.00
30.00
33.10
33.20
33.30
33 .00
33 .1
0 33
.2 0
33 .3
0 33
.4 0
33 .50
33 .6
0 33
.7 0
32.30
32 .30
32.40
32.40
32.50
32.50
32.60
32.60
32.70
32.70
32.80
32.80
32.90
32.9033.00
33.00
33.1033 .2
033.20 32.30
32.40
31 .6
0 31.60
31 .70
31 .8
0
31 .9
0 31 .90
32 .0
0
32 .1
0
32 .2
0
32 .3
0
32.20
32.30
32.40
33.10 33.20
30.54
30.42
31.80
31.90
31.50
31.60
29.73
29.64
29.59
30.80 30.90
31.00
30.50 30.60
30.70 30.80
30 .90
30.90
30.20 30.30
30.40 30.50
30.60
28.80
30.00 30.00
30.10
30.10
30.10
30.10
30.20
30.20
29 .8
029 .9
0
0+ 00
0+ 25
0+ 50
0+6 2
0+00
0+25
0+50
0+75
0+88
0+ 00
0+ 25
0+ 38
0+00
0+25
0+46
1:3,0
1:3,0
1: 3,
0
1: 3,0
-3 3.
29 %
1:3,0
1:3,01: 3,0
5. 03
2/ 2/
2/
2/ 2/ 2/ 2/ 2/ 2/ 2/ 2/ 2/ 2/ 2/
2/
2/
2/
2/
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X
X X
X
X
X X
X
X X
X X
X X
X
X X
X X
X
X X
X X
X
X X
X X
X
X X
X
X X
X X
X
X
X
X
X
X
X X
X
X X
X X
X X
X
X X
X X
X
X X
X
X
X
X
X X
X
X
X
X
X
X
X
X
XX
X
X
X X
X X
X
X X
X
X X
X
X
X
X X
X
X
X
X X
X X
X
X X
X X
X X
X
X
X
X X
X X
X
X X
X X
X
X
X
X
X X
X
X X
X
X X
X X X
X X
X X
X X
X
X X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X
X X
X
X X
X X
X X
X
X X
X X
X X
X
X
X
X X
X X
X
X X
X
X X
X X
X
X X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X X
X
X X
X X
X
X X
XX
X
X X
X X
X X
X X
X X
X
X X
X
X X
X X
X
X X
X
X
X
X
X
X XXXXXX
X X
X
X X
XX X
X
X X
X X
X X X X X X
X
X
X
X
X
X X
X
X XXXXXX
X
X X
X X
X
X X
X
X
X X
X X
X
X
X
X X
X X
X
X
X
X
X
X
X
X
X
X X X
X X
X X
X
X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X X
X
X X
X
X X
X
X X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X X
X
X X
X
X
X
X
X
X
X
X X
X
X X
X X
X
X
X
X
X
X
X X
X X
X X
X
X X
X
X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X X
X X
X
X X
X X
X X
X X
X X
X X
X
X
X X
X
X
X X
X
X X
X X
X X
X
X X
X
X X
X
X X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X
X
X
X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XXXX
X
X X
X X
X X
X X X
X X
X X
X X
X
X
X
X
X
X
X
X
X X
X
X
X X
X X
X
X
X X
X X
X
X
X
X
X
X
X
X
X
X X X X
X
X
X
X
X
X
XX
X
X
X X
X X
X X
X
X
X
X
X X
X
X
X
X
X
X
X
X X
X X
X X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X X X
X X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X X
X
X
X
X
X X
X
X X
X X
X
X X
X XX
X
X X
X
X
X
X X
X X
X
X
X X
X X
X XX
XX X
X
X
X
X
X X
X X
X X
X X
X
X X
X
X X
X X
X
X X
X X
X X
X X
X X
X X X X X X X X X X X X X
X X X X X X X X X X
X X X X X X
X
X
X X
X X
X X
X X
X
X X
X X
X X
X X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
W1.1
W1.1
W1.1
W1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
Projekteeritud tänavavalgustuse juhtimiskilp
W1.1
W1.1
W1.1
W1.1
W1.1
W1.1
W1.1
W1.1
W1.1 W1.1
W1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W1.1
W1.1 W1.1
W1.1 W1.1
W1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W1.1
W1.1 W1.1
W1.1
W1.1
W1.1
W1.1
W1.1
W1.1
W1.1
W1.1 W1.1W1.1
W1.1
.
1.1
1.1
1.1
W1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W1.1
W1.1
W1.1
W1.1
W1.1
W1.1
W1.1
W1.1 W1.1
W1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W1.1
W1.1
W1.1
W1.1
W1.1
W1.1
W1.1
W1.1
W1.1 W1.1
W1.1
W1.1
W1.1
W1.1
W1.1
W 1.1
W 1.1
W 1.1
W1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W 1.1
W1.1
X X
X
X
X
X
X
X
X
Pumpla liitumiskilp, elektrilevi töövõtus Pumpla automaatika kilp
W1.1 W1.1 W1.1 W1.1 W1.1 W1.1 W1.1 W1.1 W1.1 W1.1
W1.1
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/ 2/
2/
2/
2/
2/
2/ 2/
2/ 2/
2/ 2/
2/ 2/
2/ 2/
2/
2/
2/ 2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/ 2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
2/
W 1.1
W 1.1
W1.1
W 1.1
W 1.1
W1.1
W1.1
M8-VV1
M8-VV1 M8-VV1 M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1 M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M8-VV1
M5-VV4
M5-VV4
M5-VV4
M5-VV4
M5-VV4
M5-VV4
M5-VV4
M5-VV4
M5-VV4
M5-VV4
M5-VV4
M5-VV4
M5-VV4
M5-VV4
M5-VV3
M5-VV3
M5-VV3
M5-VV3
M5-VV3 M5-VV3
M5-VV3
M6-VV2
M6-VV2
M6-VV2
M6-VV2
M6-ÜV1
M6-ÜV1+ÜV2
M6-ÜV2
M6-ÜV2 M6-ÜV2
M6-ÜV1
M6-ÜV1
M6-ÜV1
M6-ÜV1
M6-ÜV1
M6-ÜV1
M6-ÜV1
M6-ÜV2
M5-VV4
M6-ÜV1+ÜV2
2
1
1
K1
K1
K1 2
K1
K1
1 2
K1
K1
1
3
K1
1
2
1
3
K1
K1
K1
2
K1
K1
K1
K1
1
2
K1
K1
K1
K1
K1
K1
K1
← PVC de160 L=47.2 i=0.0070
1
K1K1K1K1 ←PVC de160 L=44.4 i=0.0070 21
K1←de160 21
K1K1 ←de160 21
3
1
2
4
2
1
3
K1 K1
→ de
16 0
3
2
K1 K1
K1 K1
→ de
16 0
1
2
1
2
K1
K1
K1
K1
K1
→ de
16 0
1
3
K1
K1
K1
K1
1
1 2
K1
K1
K1
1
3
K1
K1
1
2
K1
K1
K1
1
3
K1
3
14
1
1
V1 V1 V1 3 1
3 1 3 1
V1
V1
V1
V1
1 2
2 1
2 1
1 2
2
1
V1
1
2
V1
V1
V1
2
1
V1
3
1
V1
V1
2
1
1
1
1 3
1 2
3
V1
V1
V1
V1
1
2
V1
V1
V1
V1
1
3
V1
V1
1 2
V1
V1
V1
1
V1
V1
V1
3 1
V1
V1
V1
V1
1 2
V1
V1
1 2
V1
V1
V1
1
3
3
1
V1
V1
V1
2
1
1
3
V1
V1
V1
V1
V1
2
2
1
1
3
1
1
3
V1 V1
V1
V1
3
2
V1
V1
1
2
V1
V1
1
3
V1
V1
1
2
V1
1
3
12
2 1
3
2 1
V1
V1
V1
1 2
V1
1
X X
X X
X X
X
X X
X X
X
X X
X
X X
X
X X
X X
X X
X X
X
X X
X
X
X X
X X
X X X X X X X X
X
X X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X
X X
X
X
X
X
X
X
X
X
X
X X X
X X
X
X X
X X
X
X X
X X
X X X
X X
X X
X X
X
X X
X X
X
X X
X
X
X
X X X
X
X
X X
X
X
X X
X X
X
X
X
X X
X X
X
X X
X X
X
X X
X X
X X
X
X
X
X
X X
X X
X
X
X X
X X
X
X
X X
X X
X
X
X
X
X
X
X
X X
X
X X
X X
X
X
X X X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X
X
X
X
X
X
X
X
X X
X
X X
X
X X
X
X X
X
X X X X X X X X X X X X X X X X X X
X X X
X
X
X
X
X
X
X
X
X
X X
X
X
D1
D1
D1
D1
X
X X
2 3
K21
K21
K21
K21 K21
K21 K21
K21
K2 1
K2 1
K2 1
K2 1
K2 1
K2 1
K21
K21
K21
K21
K21
K21
K21
K21
K21
K21
K21
K21
K21
K21
K21
K21
K2
K2
→ de
20 0
K2
K2
K2
K2
→ PP de200 L=42.2 i=0.0050
1 2
2 1
K2 K2
K2
→PP de2 0 L=33.4 i=0.0050
3
K1
K1
K1
K1
K1
K1
K1
→ PVC de160 L=80.4 i=0.0080
1 3
3 1
D 1→
PE d
e1 60
L= 11
.8 i=
0. 00
30
2
1
→ PE de160
L=28.3
i=0.0124 2
1
1
2
K1
K1
K1
K1
→ PVC de160 L=51.7 i=0.0100
12
1
D 1
D 1
D 1
D 1
→ PE
d e1
60 L
=4 7.
8 i=
0. 00
30
D 1→
PE d
e1 60
L =
18 .4
i= 0.
00 30
K1
K1 K1
K1 →
PVC de160 L=46.0 i=0.0100
K1
K1 ← PVC de160 L=22.2 i=0.0070
K1 K1
K1
K1
1 3
K1
K1
K1
K1
→ PVC de160 L=45.9 i=0.0185
2
1
2
3
1
23
12
3
12
3 1
2
2 1
2
3 1
2
3
12
1 2 1 2
2 1 2
3
12
2 1 2
V1
V1
V1 1
2 3
1
2
312
K1
K1
K1
→ PV
C de
16 0
L= 35
.8 i=
0. 00
70
1
2
3 1
2
1 2
2 1
2
4 1
2
2
1 2
1 3
2
1
2
3
1
2
2
1
2
2
1
2
2
1
2
K1
1
2
3
1 22
1
2
1
1
2
K1
K1
1
2
K1
K1
K1
K1
1
3
3 1
2
2
1 2
3 1
2
2
1 2
2
1 2
3 1
2
2
1 2
3 1
2
3
2 1
2
1
2
1 2
2
1
2
2 1
2
4
1 2
3 1
2
2
1 2
4 1
2
4
1 2
2 1
2
4 3
2 1
3
1
2
4 1
2
2
1 2
31 2
4 1
2
2
1 2
2
1 2
41 2
2
1 2
3
2
1
2
1 2 1
2
3
12
2 1
2
4
12
3
1 2
3
1 2
← PV
C de
16 0
L= 8.7
i= 0.0
07 0
2
1
2
V1
2 1
3
2
1
V1
2
1
2
V1
2
1
2
2
K1
3
1
2
K1
3
1
2
K1
2
3
1
2
1 2
V1
3
1
2
K1
3
1
2
K1
K1
K1
K1
1
2
3
12
K21
K21
K21
K2
K2
K2
K2
K2
→ PP de200 L=60.7 i=0.0025
K21
K21
K21
K21
X
K1
←PVC de160L=17.4 i=0.00701 2
1 2
3 1
1
2
3
1
2 3
2 3
V1 V1
V1 V1
1
2
K21
K21
K21
→ PP de200 L=38.3 i=0.0129
12
K1 s
K1 s
K1 s
K1 s
K1 s ←
PE de110 L=78.4 i=0.0077
1
2
1 2
3
D1
D1
D1
V1
V1
V1
1 2
V1
V1
2 1
V1
2
2
1
V1
21
1 2
1
2
K1
K1
K1
K1
K1
1 2
V1
1
2
1 2
1
2
2
1
V1 V1 V1
2 1V1 2 1
V1
2
1
K1 2 12
1
PVC de160 L=49.7 i=0.0133
PVC de160 L=34.7 i=0.0147
PVC de160 L=50.3 i=0.0075
PVC de160 L=9.4 i=0.0075
PVC de160 L=32.8 i=0.0079
PVC de160 L=19.9 i=0.0201
PVC de160 L=40.1 i=0.0120
PVC de160 L=29.3 i=0.0078
→ PVC de160 L=32.7 i=0.0079
PVC de160 L=10.8 i=0.0080
PVC de160 L=18.2 i=0.0115
PVC de160 L=24.8 i=0.0113
PVC de160 L=33.3 i=0.0070
K1s
←PE de11L=11.3i=0.0 57 2
1
PVC de160 L=3.8 i=0.0100
PVC de160 L=14.5 i=0.0070
V1
PVC de160 L=10.0 i=0.0070
K1
← PVC de160
L=14.6 i=0.0070
1 2
V1
V1
2
2
1
2
312 3
2
1
3 1
1 22
K1
K1
V1
V1
3 2
1 2
1
1
D1
D1
D1
D1
D1
D1
D1
D1
4 1
D 1
2
2
1
12
K1
1
2
1
1
2
V1
V1
V1
V1
V1
V1
V1
12
1
2
1
2
2
1
1
2
1
2
1
2
D1
1
2
2 1
→ PV
C de
16 0
L= 8.
9 i=
0. 00
70
→ PV
C de
16 0
L= 9.
2 i=
0. 00
70
1
2
12
1
2
V1
V1
2 1
1 1
2
1 2
X
X X X X X X X X X
PVC de160 L=13.7 i=0.0100
PVC de160 L=14.1 i=0.0100
PVC de160 L=11.8 i=0.0100
PVC de160 L=14.2 i=0.0100
PVC de160 L=9.5 i=0.0100
PVC de160 L=48.2 i=0.0070
PVC de160 L=13.0 i=0.0070
PVC de160 L=10.1 i=0.0070
PVC de160 L=9.5 i=0.0070
PVC de160 L=14.1 i=0.0070
PVC de160 L=9.5 i=0.0070
D1
D1
D1
D1 D1
D1
D
D1
→ PE de160 L=88.1 i=0.0030
D 1
D 1
D 1
D 1
← PE de160 L=44.2 i=0.0030
D1
←PE de160L=14.9i=0.0030 23
→ PE
d e1
60 L=
7. 4
i= 0.
00 30
1
2
1
→PE de160L=10.3i=0.0030
D1
D1
→ PE de160 L=26.6 i=0.0030
3
→PE de160L=8.5i=0.0030 1
2
1
2
V1
2 1
1 3
2 1 2
2
1
321 2
2
V1
2
1
2
1
V1 V1
2
1
V1 V1
V1
2
1
V1
2
1
2
1
2
1
1 1
2
1 2
3
2 1 2
1
1 2
V11 2
2 13
PVC de160 L=10.5 i=0.0100
PVC de160 L=3.5 i=0.0100
PVC de160 L=9.5 i=0.0100
PVC de160 L=9.5 i=0.0100
PE de160 L=43.9 i=0.0030
K1
K1
3
1
V1
V1
1 3
V1
2
1
2
PVC de160 L=24.5 i=0.0070
PVC de160 L=24.1 i=0.0070
PVC de160 L=21.7 i=0.0070
PVC de160 L=3.5 i=0.0070
1
2
KV-429.70 1) 29.80 de200
PVC de160 L=52.9 i=0.0070
L=9.5 i=0.0100
PE de160 L=50.0 i=0.0055
PVC de160 L=25.8 i=0.0070
PVC de160 L=9.5 i=0.0070
PE de160 L=85.7 i=0.0051
PVC de160 L=24.3 i=0.0070
PVC de160 L=9.4 i=0.0100
PVC de160 L=9.4 i=0.0100
PVC de160 L=9.4 i=0.0100
PVC de160 L=9.5 i=0.0100
PVC de160 L=9.5 i=0.0100
PVC de160 L=9.1 i=0.0100
PVC de160 L=8.5 i=0.0070
PVC de160 L=9.5 i=0.0100
PVC de160 L=9.5 i=0.0100
PVC de160 L=9.5 i=0.0100
PVC de160 L=8.0 i=0.0075
PVC de160 L=9.1 i=0.0075 PVC de160
L=8.0 i=0.0075
D 1
D1 D1
D 1
D 1
→ PE
d e1
60 L
=5 6.
2 i=
0. 00
62
D1 D1
D 1
D1 D1
D 1
→ PE
d e1
60 L
=6 4.
1 i=
0. 00
94
1
2
PVC de160 L=35.3 i=0.0096
← PE de160 L=
17.5 i= 0.0030
1
2
PVC de160 L=29.9 i=0.008
X
X
K2 K2
K2
→ PP
d e2
00 L
=3 7.
1 i=
0. 00
50
K2
K2
K2
K2
K2
→
PP de2
00 L=55.
0 i= 0.0
050
KV-12 30.90 1) 30.40 de200 PP 315
KV-1131.35 1) 31.11 de200 PP 315
KV-1031.80 1) 31.30 de200 PP 315
KV-1331.05 1) 30.13 de200 PP 315
K2
K2
K2
K2 K2-11 30.60
1) 29.40 de200 2) 29.40 de200 PE de560/500
KV-9 29.85 1) 29.26 de200
KV-828.83 1) 28.88 de200
K2-9 29.71 1) 29.12 de200 2) 29.12 de200 PE de560/500
K2-629.95 1) 29.33 de200 2) 29.33 de200 PE de560/500
K2
K2
K2
K2
K2 K2
K2-12 31.40 1) 30.22 de 00 PE de560/500 K2-4 31.18
1) 30.07 de200 PE de560/500
K2-1031.00 1) 29.97 de200 PE de560/500
K2-7 29.95 29.60 1) 29.46 de200 PE de560/500
Road Expert
/allkirjastatud digitaalselt/
/allkirjastatud digitaalselt/
/allkirjastatud digitaalselt/
/allkirjastatud digitaalselt/
Road-Expert OÜ Reg kood 14449962 Tel +372 5665 0034 [email protected] www.roadexpert.ee
Tellija:
Projekti nimetus
Objekti asukoht
Joonise nimetus
Projekti number Projekti staadium Joonise number Joonise mõõtkava Kuupäev
19.08.2025
Projektijuht
Projekteerija
Projekteerija
Ivar Kartusov
Meelis Kreevan
Kert Jõeäär
Pikk tn 19 ja 19a kinnistute DP järgsed teed ning tehnovõrgud
Harku alevik, Harku vald, Harju maakond
Lõiked
23035 Eelprojekt TL-6-01 1:100
Astlanda Kinnisvara OÜ Reg kood 11660165 [email protected]
Lõige 1-1
Lõige 2-2
õige -3 Lõige -4
Lõige 5-5
Valge 4 / 11413 Tallinn / 620 1200 / [email protected] / www.transpordiamet.ee
Registrikood 70001490
Harku Vallavalitsus
Kallaste tn 12
76901, Harju maakond, Harku vald,
Tabasalu alevik
Teie 26.08.2025
Meie 04.09.2025 nr 7.1-2/25/7052-6
Ehitusloa eelnõu nr 2411271/08015
kooskõlastamine märkustega
Olete esitanud Transpordiametile kooskõlastamiseks Harju maakonna Harku valla Harku aleviku
ehitusloa eelnõu (menetlus nr 438451).
Ehitusluba antakse välja teede, side kanalisatsiooni, veetorustiku, reovee kanalisatsioonitorustiku,
sajuveekanalisatsiooni torustiku, soojustorustiku, pargi, tuletõrjeveehüdrandi ehitamiseks.
Ehitusloa aluseks on projektid:
„Pikk tn 19 ja 19a kinnistute DP järgsed teed ning tehnovõrgud“ projekteerija Road-Expert OÜ
töö nr 23035.
„Pikk tn 19 ja 19a kinnistute DP järgsed teed ja tehnovõrgud Köide: Maastikuarhitektuurne
lahendus“ projekteerija K-Projekt AS töö nr 23078.
„Pikk tn 19 ja 19a kinnistud. Elektri-, nõrkvoolu- ja valgustuspaigaldise
välisvõrgud“ projekteerija 3INS OÜ töö nr 24014.
„Pikk tn 19 ja 19a kinnistute DP järgsed teed ning tehnovõrgud. Veevarustuse ja kanalisatsiooni
välisvõrk (VKV)“ projekteerija VP Projekt OÜ töö nr 202324.
„Pikk tn 19 ja 19a kinnistute DP järgsed teed ning tehnovõrgud“ projekteerija Soojatooja OÜ töö
nr 2396.
Ehitusloa aluseks olevatest projektidest nähtub, et riigitee kaitsevööndisse ega riigitee alusele
maale rajatisi ei kavandata.
Lähtudes ehitusseadustiku § 70 lg, kooskõlastame ehitusloa eelnõu nr 2411271/08015 eeldusel,
et riigitee kaitsevööndisse ja riigitee alusele maale rajatisi ei kavandata ning kavandatava arenduse
alalt sademevee juhtimist riigitee alusele maaüksusele, sh riigitee koosseisu kuuluvatesse
teekraavidesse ja truupidesse ei toimu. Lisaks nähakse ette vastavalt projektile (Road-Expert OÜ
töö nr 23035) kolme kraavi sulgemine.
Kooskõlastatud projekti muutmisel riigitee piirides ja/või kaitsevööndis tuleb projektlahendus
Transpordiametiga uuesti kooskõlastada.
Kooskõlastus kehtib kaks aastat välja andmise kuupäevast. Kui ehitusluba ei ole selleks ajaks
antud, siis palume Transpordiamet kaasata uuesti ehitusloa või projekteerimistingimuste
menetlusse.
2 (2)
Lugupidamisega
(allkirjastatud digitaalselt)
Laur Kõiv
peaspetsialist
planeerimise osakonna tehnovõrkude üksus
Lisa: Asendiplaanid
Seletuskiri
Läbilõike joonis
Laur Kõiv
55901417, [email protected]
| Nimi | K.p. | Δ | Viit | Tüüp | Org | Osapooled |
|---|---|---|---|---|---|---|
| EHR- Harjumaa, Harku alevik, Pikk tn 19 ja 19a kinnistutel rajatiste ehitusloa taotlus, menetlus nr 438451 | 26.08.2025 | 1 | 7.1-2/25/7052-5 | Sissetulev kiri | transpordiamet | Harku Vallavalitsus |
| Vastus EHR- Harjumaa, Harku alevik, Pikk tn 19 ja 19a kinnistutel rajatiste ehitusloa taotlus, menetlus nr 438451 | 27.06.2025 | 3 | 7.1-2/25/7052-4 | Valjaminev kiri | transpordiamet | Harku Vallavalitsus |
| EHR- Harjumaa, Harku alevik, Pikk tn 19 ja 19a kinnistutel rajatiste ehitusloa taotlus, menetlus nr 438451 | 13.06.2025 | 3 | 7.1-2/25/7052-3 | Sissetulev kiri | transpordiamet | Harku Vallavalitsus |
| Vastus EHR- Harjumaa, Harku alevik, Pikk tn 19 ja 19a kinnistutel rajatiste ehitusloa taotlus, menetlus nr 438451 | 09.05.2025 | 3 | 7.1-2/25/7052-2 | Valjaminev kiri | transpordiamet | Harku Vallavalitsus |