Dokumendiregister | Konkurentsiamet |
Viit | 7-26/2025-004 |
Registreeritud | 13.10.2025 |
Sünkroonitud | 14.10.2025 |
Liik | Otsus |
Funktsioon | 7 Energiavaldkond |
Sari | 7-26 Elektrienergia võrgueeskirjade otsused |
Toimik | 7-26/2025 |
Juurdepääsupiirang | Avalik |
Juurdepääsupiirang | |
Adressaat | |
Saabumis/saatmisviis | |
Vastutaja | Armin Ilisson (Konkurentsiamet, Regulatsiooniteenistus, Energiaturgude osakond) |
Originaal | Ava uues aknas |
1
Finnish, Estonian and Latvian TSOs of
Baltic CCR TSOs’ Common Methodology for Splitting Long-Term Cross-Zonal
Capacity in Accordance with Article 16 of Commission Regulation (EU) 2016/1719 of
26 September 2016 Establishing a Guideline on Forward Capacity Allocation
October 2025
2
Whereas
(1) This document by Finnish, Estonian and Latvian Transmission System Operators of Baltic Capacity
Calculation Region (hereafter referred to as “Baltic CCR”) as defined in accordance with Article 15 of
Commission Regulation (EU) 2015/1222 establishing a guideline on Capacity Allocation and
Congestion Management (hereafter referred to as the “CACM Regulation”) describes a common
Methodology for Splitting Long-Term Cross-Zonal Capacity (hereafter referred to as the “LTCS”) in
accordance with Article 16 of the Commission Regulation 2016/1719 (hereafter referred to as the “FCA
Regulation).
(2) This LTCS takes into account the general principles, goals and other methodologies set in the FCA
Regulation, CACM Regulation, Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing
a Guideline on Electricity Transmission System Operation (hereafter referred to as "SO Regulation"),
and Regulation 2019/943 of the European Parliament and of the Council of 5 June 2019 on the internal
market for electricity (hereafter referred to as “Regulation No 2019/943”).
(3) The goal of the FCA Regulation is the coordination and harmonisation of cross-zonal capacity
calculation and capacity allocation in the forward markets, and it sets requirements for the TSOs to
cooperate on the level of capacity calculation regions (hereinafter referred to as “CCRs”), on a pan-
European level and across bidding zone borders. The FCA Regulation also sets rules for establishing
capacity calculation methodologies based either on the coordinated net transmission capacity approach
(hereafter referred to as “CNTC approach”) or on the flow-based approach (hereafter referred to as “FB
approach”). In case of the TSO(s) allocating long term transmissions rights (hereinafter referred to as
“LTTRs”), the FCA Regulation also sets rules for establishing a methodology for the splitting of long
term capacity on different time frames, e.g. month and year.
(4) This LTCS fulfills the requirement of Article 16(2)(a) of the FCA Regulation as it ensures the
availability of LTTRs for market participants at least for the yearly and monthly timeframes.
(5) This LTCS fulfills the requirement of Artice 16(2)(b) by taking into account the Capacity Calculation
Methodology developed in accordance with Article 10 of the FCA Regulation (hereinafter „Long-term
CCM“), and approved pursuant to Article 4(7)(a) of FCA Regulation, thereby being coherent with the
said methodology.
(6) This LTCS fulfills the requirement of Article 16(2)(c) as it ensures that yearly capacity shall not be
allocated for the entire volume in the yearly auction in order to allow market participants to cover their
hedging needs at least on yearly and monthly timeframes and thus allowing the market participant to
access hedging opportunities in both timeframes. Further, this LTCS does not lead to restrictions in
competition, in particular for access to long-term transmission rights, as the splitted long-term cross-
zonal capacity is allocated in public auctions.
(7) Article 4(8) of the FCA Regulation requires that the expected impact of the LTCS on the objectives
of the FCA Regulation is described. The impact is presented below (points (8) to (12) of this Whereas
Section).
(8) The LTCS contributes to and does not in any way hamper the achievement of the objectives of
Article 3 of the FCA Regulation. In particular, the LTCS serves the objectives of optimising the
calculation and allocation of long-term transmission rights (Article 3(b) of the FCA Regulation),
providing non-discriminatory access to long-term transmission rights (Article 3(c) of the FCA
Regulation), respecting the need for a fair and orderly forward capacity allocation and orderly price
formation (Article 3(e) of the FCA Regulation), ensuring and enhancing the transparency and reliability
of information on forward capacity allocation (Article 3(f) of the FCA Regulation) and contributing to
the efficient long-term operation and development of the electricity transmission system and electricity
sector in the Union (Article 3(g) of the FCA Regulation).
3
(9) The LTCS serves the objective of optimising the calculation and allocation of long-term transmission
rights in accordance with Article 3(b) of the FCA Regulation by using the Long-term CCM of the Baltic
CCR for calculating the available long-term cross-zonal capacities and using these values as a point of
departure for determining the capacities provided for the purpose of allocating LTTRs.
(10) The LTCS provides non-discriminatory access to LTTRs (Article 3(c) of the FCA Regulation) as
there are no barriers for access to the auction of LTTRs if the conditions, cf. the Harmonised Allocations
Rules, are fulfilled. Moreover it ensures fair and nondiscriminatory treatment of TSOs, the Agency,
regulatory authorities and market participants (Article 3(d) of the FCA Regulation) as the rules provide
no undue discrimination for market participants and allows for access to data by the Agency regulatory
authorities and market participants.
(11) The LTCS contributes to the objective of respecting the need for a fair and orderly forward capacity
allocation and price formation (Article 3(e) of the FCA Regulation) by making available in due time the
cross-zonal capacity to be released in the long-term time frame and forward markets, where appropriate.
(12) The LTCS serves the objective of transparency and reliability of information (Article 3(f) of the
FCA Regulation) as the LTCS determines the main principles and main processes for allocating LTTRs.
The LTCS enables Baltic CCR TSOs to provide market participants with the same reliable information
on cross-zonal capacities and allocation constraints for long-term allocation and forecasting purposes in
a transparent way. To facilitate transparency, Baltic CCR TSOs will publish data to the market on a
regular basis to help market participants to evaluate the LTTR process and long-term capacity forecasts.
Baltic CCR TSOs will engage stakeholders in dialogue to specify necessary hedging needs to this effect.
(13) The LTCS does not hinder an efficient long-term operation in Baltic CCR and adjacent CCRs, and
the development of the transmission system in the European Union (Article 3(g) of the FCA Regulation).
The LTCS serves the objective of efficient long-term operation and development of the electricity
transmission system and electricity sector in the European Union (Article 3 (g) of the FCA Regulation)
by taking into account the Long – term CCM developed in accordance with Article 10 of the FCA
Regulation and approved pursuant to Article 4(7)(a) of FCA Regulation when determining the capacities
for the purpose of allocating LTTRs, and by contributing to the hedging opportunities of the market
participants.
(14) In conclusion, the methodology for splitting rules contributes to the general objectives of the FCA
Regulation to the benefit of market participants and electricity end consumers.
(15) The calculation of the LTTR volumes on the Finland–Estonia bidding zone border takes into
account the technical capabilities of the two HVDC interconnectors (i.e. ESTLINK 1 and ESTLINK 2)
of this border by limiting the volumes of the FI-EE LTTRs to reflect the maximum physical flow of
electricity in a situation where only one interconnector is in use. Initially, the TSOs active on this border
considered it feasible to limit the sum of yearly and monthly LTTRs to 650 MW, which corresponds to
the maximum physical electricity flow hosted by the larger of the two interconnectors (i.e. ESTLINK
2).
4
TITLE I
General
Article 1
Subject matter and scope
1. The LTCS is the methodology of Baltic CCR in accordance with Article 16(2) of the FCA Regulation.
2. This LTCS applies solely to the bidding zones borders:
a. Finland – Estonia
b. Estonia - Latvia
3. This LTCS covers the methodology for splitting capacity calculated as long-term cross-zonal capacity
for the long-term time frame, for which the LTTRs are foreseen in the regional design of long-term
transmission rights pursuant to Article 31 of FCA Regulation.
Article 2
Definitions and interpretation
1. For the purposes of the Proposal, the terms used shall have the meaning given to them in Article 2 of
Regulation 2019/943 , Article 2 of the FCA Regulation, Article 2 of the CACM Regulation, Article 2 of
the Harmonised Allocation Rules for long‐term transmissioon rights in accordance with Article 51 of
FCA Regulation (EU) and Article 2 of Commission Regulation (EU) No 543/2013 of 14 June 2013 on
submission and publication of data in electricity markets and amending Annex I to Regulation (EC) No
714/2009 of the European Parliament and of the Council (hereafter referred to as "Transparency
Regulation") and Article 2 of capacity calculation methodology developed in Baltic CCR in accordance
with Article 20(2) of the CACM Regulation.
2. In addition, in this LTCS, the following terms shall have the meaning below:
a. “LTTR” means a Physical or a Financial Long Term Transmission Rights;
b. “HAR” means Harmonised Allocation Rules;
c. “SAP” means Single Allocation Platform;
d. "FCA Regulation" means guideline on Forward Capacity Allocation;
e. "Long-term CCM " means the Capacity Calculation Methodology in accordance with Article
10 of the FCA Regulation.
3. In this LTCS, unless the context requires otherwise:
a. the singular indicates the plural and vice versa;
b. headings are inserted for convenience only and do not affect the interpretation of this
LTCS; and
c. any reference to legislation, regulations, directives, orders, instruments, codes or any other
enactment shall include any modification, extension or re-enactment of it when in force.
4. For the sake of clarity this LTCS does not affect TSOs' right to delegate all or part of their task in
accordance with the Article 62 of the FCA Regulation. In this LTCS "TSO" shall refer to Transmission
System Operator or to a third party whom the TSO has delegated task(s) to in accordance with the FCA
5
Regulation, where applicable. However, the delegating TSO shall remain responsible for ensuring
compliance with the obligations under the FCA Regulation and under the HAR.
TITLE 2
Applying of capacity calculated for long-term time frame
Article 3
Applying of capacity calculated for long-term time frame
1. The Baltic CCR TSOs shall apply the long term capacity calculated by the methodology set out by
the Long-term CCM for each long term time frame as a point of departure for calculating the amount
of LTTRs for the different time frames. This methodology applies to all time frames foreseen in the
regional design of long-term transmission rights in accordance with Article 31(2) of the FCA
Regulation.
2. The Baltic CCR TSOs shall apply the following procedure when splitting and issuing the amount of
LTTRs for each different time frames:
a. A week prior to the yearly allocation, the amount of yearly LTTRs for the upcoming yearly
allocation shall be published to the market.
b. If relevant, once a quarter and no later than two (2) Working Days prior to the quarterly
allocation, the amount of quarterly LTTRs shall be publish to the market.
c. Once a month and no later than two (2) Working Days prior to the monthly allocation, the
amount of LTTRs with a monthly time frame shall be published to the market.
d. In case other time frames than year, quarter and month are introduced, the amount of LTTRs
within that time frame shall be published to the market no later than two working days prior to
the allocation in the month before the time frame of where the LTTRs apply.
Article 4
Methodology for splitting long-term cross-zonal capacity
1. The relevant TSOs shall split the calculated long-term cross-zonal capacity for each forward capacity
allocation by applying the methodology for splitting cross-zonal capacity pursuant to point 3 in this
Article 4.
2. The splitting of long-term cross-zonal capacity shall be performed primarily by relevant TSOs. The
relevant TSOs may delegate the splitting of long-term cross-zonal capacity to the coordinated capacity
calculator provided that they have evaluated the effectiveness of this function as performed by the
coordinated capacity calculator, in accordance with Article 62(1) of the FCA Regulation. Delegation to
the coordinated capacity calculator (Baltic Regional Coordination Centre, hereafter referred to as
"BRCC”) shall only take place if the TSOs determine that the BRCC can effectively carry out this
function.
3. The calculation of amount of LTTRs for each timeframe shall be done in the following way:
a. The long-term cross-zonal capacity (hereinafter referred to as “LTCZC") for respective
timeframe and respective border shall be calculated according to the Long-term CCM of Baltic
CCR, as stated in FCA Regulation Article 10.
6
b. The following splitting shares of long-term cross-zonal capacity for EE-LV border shall be
applied when allocating yearly, quarterly and montly shares of LTTRs capacity (in MW). When
allocating shares of LTTR capacity, the limiting factor is the forecast value of LTCZC. For EE-
LV border maximum % of LTCZC that can be reserved for Baltic frequency reserves market
for balancing reserves sharing and exchange is set in the Methodology for the market-based
allocation process of cross-zonal capacity for the exchange of balancing capacity for the Baltic
CCR in accordance with Article 41(1) of the Commission Regulation (EU) 2017/2195 of 23
November 2017 establishing a guideline on electricity balancing:
LTTRY(n) = min (Ω*minLTCZCY(n); 300)
LTTRQ(n) = min (Ω*minLTCZCQ(n)– LTTRY(n); 50)
LTTRM(n) = min (Ω*minLTCZCM(n)– LTTRY(n) – LTTRQ(n) ; 100)
Where:
LTTRY(n) – LTTRs capacity offered in yearly timeframe for year n in MW;
LTTRQ(n) – LTTRs capacity offered in relevant quarterly timeframe for year n in MW;
LTTRM(n) – LTTRs capacity offered in relevant monthly timeframe for year n in MW;
Ω - the maximum actual share of cross-zonal capacity (as a percentage of day-ahead NTC) in
the direction from Estonia to Latvia reserved for the exchange of balancing capacity within the
Baltic CCR, per market time unit, during the six-month period preceding the month in which
the forward capacity allocation takes place, excluding the top 1% of market time units with the
highest allocated share of cross-zonal capacity;
minLTCZCY(n)– the minimum forecasted monthly NTC value in MW of the long-term cross-
zonal capacity for respective border and respective year (n) calculated according to the Long-
term CCM of Baltic CCR, as stated in FCA Regulation Article 10;
minLTCZCQ(n) – the minimum forecasted monthly NTC value in MW of the long-term cross-
zonal capacity for respective border and respective year (n) or quarter (n) calculated according
to the Long-term CCM of Baltic CCR, as stated in FCA Regulation Article 10;
minLTCZCM(n)– the minimum forecasted daily NTC value in MW of the long-term cross-
zonal capacity for respective border and respective month n calculated according to the Long-
term CCM of Baltic CCR, as stated in FCA Regulation Article 10.
c. The following splitting shares of long-term cross-zonal capacity for FI-EE border shall be
applied when allocating yearly and montly shares of LTTRs capacity (in MW):
LTTRY(n) = min (minLTCZCY(n); 350)
LTTRM(n) = min (minLTCZCM(n)– LTTRY(n); 300)
Where:
LTTRY(n) – LTTRs capacity offered in yearly timeframe for year n in MW;
LTTRM(n) – LTTRs capacity offered in relevant monthly timeframe for year n in MW;
7
minLTCZCY(n)– the minimum forecasted monthly NTC value in MW of the long-term cross-
zonal capacity for respective border and respective year (n) calculated according to the Long-
term CCM of Baltic CCR, as stated in FCA Regulation Article 10;
minLTCZCM(n)– the minimum forecasted daily NTC value in MW of the long-term cross-
zonal capacity for respective border and respective month n calculated according to the Long-
term CCM of Baltic CCR, as stated in FCA Regulation Article 10.
Article 5
Rules for avoiding undue discrimination of access to purchase of long term
transmissions right
1. In accordance with article 16(2c) of FCA Regulation there shall be no restrictions on the access to
purchase LTTRs that lead to undue discrimination of access to purchase LTTRs or undue restrictions in
competition between purchasers of LTTRs in the auctions of LTTRs.
2. All market players shall be given access to purchase LTTRs if they fulfil the general condition set
out in Chapter 2 and 3 of the HAR.
Article 6
Methodology for the validation of cross-zonal capacity allocated as LTTR´s for long
term time frame
Baltic CCR TSOs shall perform the validation of amount of LTTRs on its bidding zone border(s) to
ensure that the results of regional calculation of LTTRs and splitting between time frames will ensure
operational security. When performing the validation, the TSO shall consider operational security,
taking into account new and relevant information obtained during or after the most recent capacity
calculation.
TITLE 3
Miscellaneous
Article 7
Publication of data
1. The TSOs shall, in compliance with Article 47 of the FCA Regulation and in accordance with Article
3(f) of the FCA Regulation, and in addition to the data items and definitions of Transparency Regulation,
publish data regarding the LTTR auctions on a regular basis and as soon as possible.
2. The publication of the data referred to in paragraph 1 can be done on behalf of the TSOs on SAP´s
web page.
Article 8
Capacity calculation process
1. Within the capacity calculation process, reduction periods may be defined in accordance with HAR
Article 30. The reduction periods will not be taken into account when using the LTCS cf. Article 4.
8
2. When the amount of LTTRs are provided to the SAP for the auction the reduction periods will be
included in the final product. This ensures that the final product allocated to the market via the SAP
includes reduction periods as given by the capacity calculation process.
TITLE 4
Final provisions
Article 9
Publication and Implementation
1. Batic CCR TSOs shall publish the LTCS without undue delay after the Baltic CCR NRAs has
approved the LTCS or a decision has been taken by the Agency for the Cooperation of Energy
Regulators in accordance with Article 4(9), Article 4(10) and Article (11) of the FCA Regulation
regarding the methodology.
2. The methodology will be implemented from the first LTTR auction after the Baltic CCR NRAs has
approved the LTCS or a decision has been taken by the Agency for the Cooperation of Energy
Regulators in accordance with Article 4(9), Article 4(10) and Article 4(11) of the FCA Regulation
regarding the methodology, and after the implementation of the Long-term CCM of Baltic CCR.
Article 10
Language
The reference language for this LTCS shall be English. For the avoidance of doubt, where TSOs need
to translate this LTCS into their national language(s), in the event of inconsistencies between the English
version published by TSOs in accordance with Article 4(13) of the FCA Regulation and any version in
another language, the relevant TSOs shall be obliged to dispel any inconsistencies by providing a revised
translation of this LTCS to their relevant national regulatory authorities.
1
Position paper by the Baltic States National Regulatory Authorities of Estonia, Finland and Latvia
on
Finnish, Estonian and Latvian TSOs of Baltic CCR TSOs’ Common Methodology for Splitting Long-Term Cross-Zonal Capacity in
Accordance with Article 16 of Commission Regulation (EU) 2016/1719 of 26 September 2016 Establishing a Guideline on
Forward Capacity Allocation
7 October 2025
2
1. INTRODUCTION AND LEGAL CONTEXT
Pursuant to Articles 4(1), 4(7)(b), and 16(1) of the Commission Regulation (EU)
2016/1719 of 26 September 2016 establishing a guideline on forward capacity
allocation (hereinafter - Regulation 2016/1719), the transmission system operators
of the Baltic capacity calculation region (CCR) are required to jointly develop a
proposal for a methodology for splitting long-term cross-zonal capacity in a
coordinated manner between different long-term time frames within the respective
region. The methodology for splitting long-term cross-zonal capacity applies to the
Finnish-Estonian and Estonian-Latvian bidding zone borders.
This document elaborates an agreement, between National Regulatory Authorities
of Estonia, Finland and Latvia (hereinafter – NRAs)1, agreed on 7 October 2025, on
the Finnish, Estonian and Latvian transmission system operators (hereinafter – the
TSOs)2 proposal on the Baltic Capacity Calculation Region (hereinafter – Baltic
CCR) Common Methodology for Splitting Long-Term Cross-Zonal Capacity in
Accordance with Article 16 of Regulation 2016/1719 (hereinafter – LTCS Proposal).
The TSOs submitted the LTCS Proposal in accordance with Article 16(1) of the
Regulation 2016/1719 and the last concerned NRA received the proposal on 18
February 2025.
Article 4(9) of the Regulation 2016/1719 requires NRAs to consult and closely
cooperate and coordinate with each other in order to reach an agreement and take a
decision within six months following receipt of submission of the proposal to the
last Baltic NRA.
On 19 June 2025 in accordance with Article 4(11) of the Regulation 2016/1719 the
NRAs jointly requested an amendment to the LTCS Proposal. On 20 August 2025
the TSOs submitted an amended LTCS Proposal for approval within 2 months
following the request from NRAs.
The NRAs shall decide on the amended LTCS Proposal within 2 months following
from its submission, no later than 21 October 2025.
This agreement of the NRAs shall provide evidence that the LTCS Proposal, does
not, at this stage, need to be adopted by the Agency for the Cooperation of Energy
Regulators (hereinafter ACER or Agency) pursuant to Article 4(10) of the
Regulation 2016/1719. It is intended to constitute the basis on which the NRAs will
each subsequently issue a national decision to approve the LTCS Proposal, pursuant
to Article 4(9) of the Regulation 2016/1719.
The legal provisions that lie at the basis of the LTCS Proposal, and this NRAs’
agreement on the LTCS Proposal can be found in Articles 3, 4 and 16 of the
Regulation 2016/1719, and in Article 5 of the Regulation (EU) 2019/942 of the
European Parliament and of the Council of 5 June 2019 establishing a European
Union Agency for the Cooperation of Energy Regulators (hereinafter – Regulation
2019/942). These articles are set out below for reference.
1 Estonian Competition Authority, Energy Authority of Finland, Public Utilities Commission of Latvia 2 Elering AS, Fingrid Oyj, AS "Augstsprieguma tīkls"
3
REGULATION 2016/1719
Article 3
Objectives of forward capacity allocation
This Regulation aims at:
(a) promoting effective long-term cross-zonal trade with long-term cross-zonal hedging
opportunities for market participants;
(b) optimising the calculation and allocation of long-term cross-zonal capacity;
(c) providing non-discriminatory access to long-term cross-zonal capacity;
(d) ensuring fair and non-discriminatory treatment of TSOs, the Agency, regulatory
authorities and market participants;
(e) respecting the need for a fair and orderly forward capacity allocation and orderly
price formation;
(f) ensuring and enhancing the transparency and reliability of information on forward
capacity allocation;
(g) contributing to the efficient long-term operation and development of the electricity
transmission system and electricity sector in the Union.
Article 4
Adoption of terms and conditions or methodologies (…)
1. TSOs shall develop the terms and conditions or methodologies required by this
Regulation and submit them for approval to the Agency or the competent regulatory
authorities within the respective deadlines set out in this Regulation. In exceptional
circumstances, notably in cases where a deadline cannot be met due to circumstances
external to the sphere of TSOs, the deadlines for terms and conditions or methodologies
may be prolonged by the Agency in procedures pursuant to paragraph 6, and jointly by
all competent regulatory authorities in procedures pursuant to paragraph 7. Where a
proposal for terms and conditions or methodologies pursuant to this Regulation needs
to be developed and agreed by more than one TSO, the participating TSOs shall closely
cooperate. TSOs, with the assistance of the ENTSO for Electricity, shall regularly
inform the competent regulatory authorities and the Agency about the progress of the
development of those terms and conditions or methodologies.
(…)
5. Each regulatory authority or where applicable the Agency, as the case may be, shall
be responsible for approving the terms and conditions or methodologies referred to in
paragraphs 6 and 7. Before approving the terms and conditions or methodologies, the
Agency or the competent regulatory authorities shall revise the proposals where
necessary, after consulting the respective TSOs, in order to ensure that they are in line
with the purpose of this Regulation and contribute to market integration, non-
discrimination, effective competition and the proper functioning of the market.
(…)
4
7. The proposals for the following terms and conditions or methodologies and any
amendments thereof shall be subject to approval by all regulatory authorities of the
concerned region:
(…)
b) the methodology for splitting cross-zonal capacity pursuant to Article 16;
(…)
9. Where the approval of the terms and conditions or methodologies in accordance with
paragraph 7 or the amendment in accordance with paragraph 11 requires a decision
by more than one regulatory authority, the competent regulatory authorities shall
consult and closely cooperate and coordinate with each other in order to reach an
agreement. Where applicable, the competent regulatory authorities shall take into
account the opinion of the Agency. Regulatory authorities or, where competent, the
Agency shall take decisions concerning the submitted terms and conditions or
methodologies in accordance with paragraphs 6 and 7, within 6 months following the
receipt of the terms and conditions or methodologies by the Agency or, where
applicable, by the last regulatory authority concerned. The period shall begin on the
day following that on which the proposal was submitted to the Agency in accordance
with paragraph 6 or to the last regulatory authority concerned in accordance with
paragraph 7.
10. Where the regulatory authorities have not been able to reach an agreement within
the period referred to in paragraph 9, or upon their joint request, or upon the Agency’s
request according to the third subparagraph of Article 5(3) of Regulation (EU)
2019/942, the Agency shall adopt a decision concerning the submitted proposals for
terms and conditions or methodologies within 6 months, in accordance with Article
5(3) and the second subparagraph of Article 6(10) of Regulation (EU) 2019/942.
11. In the event that the Agency or all competent regulatory authorities jointly request
an amendment to approve the terms and conditions or methodologies submitted in
accordance with paragraphs 6 and 7, the relevant TSOs shall submit a proposal for
amended terms and conditions or methodologies for approval within 2 months
following the request from the Agency or the regulatory authorities. The Agency or the
competent regulatory authorities shall decide on the amended terms and conditions or
methodologies within 2 months following their submission. Where the competent
regulatory authorities have not been able to reach an agreement on terms and
conditions or methodologies pursuant to paragraph 7 within the 2-month deadline, or
upon their joint request, or upon the Agency’s request according to the third
subparagraph of Article 5(3) of Regulation (EU) 2019/942, the Agency shall adopt a
decision concerning the amended terms and conditions or methodologies within 6
months, in accordance with Article 5(3) and the second subparagraph of Article 6(10)
of Regulation (EU) 2019/942. If the relevant TSOs fail to submit a proposal for
amended terms and conditions or methodologies, the procedure provided for in
paragraph 4 shall apply.
(…)
13. TSOs responsible for establishing the terms and conditions or methodologies in
accordance with this Regulation shall publish them on the internet after approval by
the Agency or the competent regulatory authorities or, if no such approval is required,
5
after their establishment, except where such information is considered as confidential
in accordance with Article 7.
Article 16
Methodology for splitting long-term cross-zonal capacity
1. No later than the submission of the capacity calculation methodology referred to in
Article 10, the TSOs of each capacity calculation region shall jointly develop a proposal
for a methodology for splitting long-term cross-zonal capacity in a coordinated manner
between different long-term time frames within the respective region. The proposal shall
be subject to consultation in accordance with Article 6.
2. The methodology for splitting long-term cross-zonal capacity shall comply with
the following conditions:
(a) it shall meet the hedging needs of market participants;
(b) it shall be coherent with the capacity calculation methodology;
(c) it shall not lead to restrictions in competition, in particular for access to long-term
transmission rights.
REGULATION 2019/942
Article 5
Tasks of ACER as regards the development and implementation of network codes
and guidelines
(…)
3. Where one of the following legal acts provides for the development of proposals for
terms and conditions or methodologies for the implementation of network codes and
guidelines which require the approval of all the regulatory authorities of the region
concerned, those regulatory authorities shall agree unanimously on the common terms
and conditions or methodologies to be approved by each of those regulatory
authorities:
(a) a legislative act of the Union adopted under the ordinary legislative procedure;
(b) network codes and guidelines that were adopted before 4 July 2019 and subsequent
revisions of those network codes and guidelines; or
(c) network codes and guidelines adopted as implementing acts pursuant to Article 5 of
Regulation (EU) No 182/2011.
(…)
6. Before approving the terms and conditions or methodologies referred to in
paragraphs 2 and 3, the regulatory authorities, or, where competent, ACER, shall
revise them where necessary, after consulting the ENTSO for Electricity, the ENTSO
for Gas or the EU DSO entity, in order to ensure that they are in line with the purpose
6
of the network code or guideline and contribute to market integration, non-
discrimination, effective competition and the proper functioning of the market. ACER
shall take a decision on the approval within the period specified in the relevant network
codes and guidelines. That period shall begin on the day following that on which the
proposal was referred to ACER.
2. THE PROPOSAL AND PROCESS
The NRAs have conducted a thorough and coordinated assessment of the amended
LTCS Proposal. Having assessed the amended LTCS proposal, the NRAs came to the
conclusion that even though the amendments are largely in line with the request for
amendments, there still are some places to improve. As a result, the NRAs decided to
revise parts of the LTCS Proposal before the approval, in accordance with Article 5(6)
of Regulation 2019/942 and Article 4(5) of the Regulation 2016/1719. On 23 September
2025, the NRAs sent a letter to the TSOs’ representatives to consult the TSOs on the
planned revisions to the methodology and to provide their opinion on the proposed
corrections within 14 calendar days. On 25 September 2025 the TSOs informed that
they have reviewed the NRAs proposal and find it fully acceptable.
3. NRAS’ REVISIONS ON THE AMENDED LTCS PROPOSAL
NRAs decided to revise the LTCS Proposal by making the following changes:
(Added corrections are marked in red and removed parts are crossed out.)
Whereas (13):
(13) The LTCS does not hinder an efficient long-term operation in Baltic CCR and
adjacent CCRs, and the development of the transmission system in the European
Union (Article 3(g) of the FCA Regulation). The LTCS serves the objective of efficient
long-term operation and development of the electricity transmission system and
electricity sector in the European Union (Article 3 (g) of the FCA Regulation) by
taking into account Long – term CCM developed in accordance with Article 10 of the
FCA Regulation and approved pursuant to Article 4(7)(a) of FCA Regulation when
determining the capacities for the purpose of allocating LTTRs, and by contributing to
the hedging opportunities of the market participants.
Whereas (15):
(15) The calculation of the LTTR volumes on the Finland–Estonia bidding zone border
takes into account the technical capabilities of the two HVDC interconnectors (i.e.
ESTLINK 1 and ESTLINK 2) of this border by limiting the volumes of the FI-EE
LTTRs to reflect the maximum physical flow of electricity in a situation where only
one interconnector is in use. Initially, the TSOs active on this border considered it
feasible to limit the sum of yearly and monthly LTTRs to 650 MW, which corresponds
to the maximum physical electricity flow hosted by the larger of the two
interconnectors (i.e. ESTLINK 2). Due to procedural reasons, this approach is still
maintained in this proposal although the concerned TSOs after the launch of the public
consultation of this proposal identified a clear need to limit the sum of the yearly and
monthly FI-EE LTTR volumes to reflect the actual observed technical capability of the
interconnectors. Therefore, following the submission of this current proposal, the
concerned TSOs are planning to submit a new proposal in near future to take into
account this obtained new information. In the new proposal, the concerned TSOs will
7
propose a change that is expected to primarily alleviate the impacts of the observed
underselling of the FI-EE LTTRs, thus preventing a transfer of wealth from tariff
payers to traders.
Other corrections on:
• The title page – October 2025
• Whereas (5) - FCA Regulation instead of Regulation FCA
• in Article 9(2) - … in accordance with Article 4(9), Article 4(10) and Article
4(11) …
4. CONCLUSIONS
The NRAs have consulted, closely cooperated and coordinated to reach an agreement
on the LTCS Proposal which after the NRAs revision meets the requirements of the
Regulation 2016/1719 and can thus be approved by the NRAs. Thereby, the NRAs
shall take their respective national decisions to approve the LTCS proposal, based on
this agreement.
Tatari 39 / 10134 Tallinn / 667 2400 / [email protected] / Registrikood 70000303
OTSUS
13.10.2025 nr 7-26/2025-004
Soome, Eesti ja Läti põhivõrguettevõtjate metoodika, vastavalt Komisjoni määruse (EL)
2016/1719, millega kehtestatakse võimsuse jaotamise forvardturu eeskiri, artikli 16
lõikele 1, kooskõlastamise kohta
1. Haldusmenetluse alustamine
Euroopa Komisjoni määrusega (EL) 2016/1719 kehtestati võimsuse jaotamise forvardturu
eeskiri (edaspidi ka FCA või FCA määrus)1.
FCA artikli 4 lõike 1 alusel töötavad põhivõrguettevõtjad välja FCA määrusega nõutud
tingimused ja meetodid ning esitavad need heakskiitmiseks koostööametile2 või pädevatele
reguleerivatele asutustele vastavalt FCA määruses sätestatud tähtaegadele. Erandlikel
asjaoludel, eelkõige juhul, kui tähtajast ei ole võimalik kinni pidada põhivõrguettevõtjatest
sõltumatute asjaolude tõttu, võib lõike 6 kohaste menetluste puhul tingimuste või meetodite
tähtaegu pikenda koostööamet ning lõike 7 kohaste menetluste puhul võivad seda teha kõik
pädevad reguleerivad asutused ühiselt. Kui käesoleva määruse kohase tingimuste või meetodite
kehtestamise ettepaneku väljatöötamises ja kokkuleppimises peab osalema rohkem kui üks
põhivõrguettevõtja, peavad osalevad põhivõrguettevõtjad tegema tihedat koostööd.
Põhivõrguettevõtjad peavad koostöös Euroopa elektri põhivõrguettevõtjate võrgustikuga
korrapäraselt teavitama pädevaid reguleerivaid asutusi ja koostööametit nimetatud tingimuste
või meetodite väljatöötamise edenemisest.
FCA artikli 4 lõike 5 järgi vastutab iga reguleeriv asutus või vajaduse korral koostööamet artikli
4 lõigetes 6 ja 7 osutatud tingimuste või meetodite heakskiitmise eest. Enne tingimuste ja
meetodite heakskiitmist vaatavad koostööamet või pädevad reguleerivad asutused pärast
asjaomaste põhivõrguettevõtjatega konsulteerimist vajaduse korral ettepanekud läbi, et tagada
nende kooskõla käesoleva määruse eesmärgiga ning aidata kaasa turgude lõimimisele,
mittediskrimineerimisele, tõhusale konkurentsile ja turu nõuetekohasele toimimisele.
FCA artikli 4 lõike 7 punkti b) alusel peab piirkonnaülese võimsuse jaotamise metoodika
kooskõlas FCA artikliga 16 saama kõigi asjaomase piirkonna reguleerivate asutuste heakskiidu.
FCA artikli 4 lõike 9 järgi, kui tingimuste või meetodite heakskiitmiseks vastavalt lõikele 7 või
nende muutmiseks vastavalt lõikele 11 on vaja rohkem kui ühe reguleeriva asutuse otsust,
peavad pädevad reguleerivad asutused kokkuleppele jõudmiseks omavahel konsulteerima,
tegema tihedat koostööd ja kooskõlastama oma tegevuse. Vajaduse korral võtavad pädevad
reguleerivad asutused arvesse koostööameti arvamust. Reguleerivad asutused või vajaduse
1 Kättesaadav: https://eur-lex.europa.eu/legal-content/ET/TXT/?uri=CELEX%3A02016R1719-20210315 2 Energeetikasektorit Reguleerivate Asutuste Koostöö Amet (ingl Agency for the Cooperation of Energy
Regulators ehk ACER)
2 (5)
korral koostööamet teevad lõigete 6 ja 7 kohaselt esitatud tingimuste ja meetodite kohta otsuse
kuue kuu jooksul alates sellest, kui koostööamet või asjakohasel juhul viimane asjaomane
reguleeriv asutus on tingimused või meetodid kätte saanud. Ajavahemik algab järgmisel päeval
pärast seda, kui ettepanek esitati koostööametile vastavalt lõikele 6 või viimasele asjaomasele
reguleerivale asutusele vastavalt lõikele 7.
FCA artikli 4 lõike 11 alusel, kui koostööamet või kõik pädevad reguleerivad asutused ühiselt
nõuavad lõigete 6 ja 7 kohaselt esitatud tingimuste või meetodite muutmist enne nende
heakskiitmist, peavad asjaomased põhivõrguettevõtjad esitama muudetud tingimuste või
meetodite ettepaneku heakskiitmiseks kahe kuu jooksul alates koostööameti või reguleerivate
asutuste sellekohase taotluse esitamisest. Koostööamet või pädevad reguleerivad asutused
teevad muudetud tingimuste või meetodite kohta otsuse kahe kuu jooksul pärast nende
esitamist. Kui pädevad reguleerivad asutused ei ole jõudnud kokkuleppele lõikes 7 osutatud
tingimuste või meetodite osas kahe kuu pikkuse tähtaja jooksul või nende ühise taotluse korral
või koostööameti taotlusel vastavalt määruse (EL) 2019/942 artikli 5 lõike 3 kolmandale
lõigule, võtab koostööamet kuue kuu jooksul vastavalt määruse (EL) 2019/942 artikli 5 lõikele
3 ja artikli 6 lõike 10 teisele lõigule vastu otsuse muudetud tingimuste või meetodite kohta. Kui
asjaomased põhivõrguettevõtjad ei esita tingimuste või meetodite muutmise ettepanekut,
kohaldatakse lõikes 4 kirjeldatud menetlust.
FCA artikli 4 lõike 13 alusel FCA määruse kohaste tingimuste ja meetodite väljatöötamise eest
vastutavad põhivõrguettevõtjad avaldavad need tingimused ja meetodid internetis pärast nende
heakskiitmist ameti või pädevate reguleerivate asutuste poolt, või kui heakskiitu ei ole vaja, siis
pärast nende tingimuste ja meetodite väljatöötamist, välja arvatud juhul, kui selline teave on
artikli 7 kohaselt konfidentsiaalne.
FCA artikli 16 lõike 1 järgi peavad iga võimsusarvutuse ala põhivõrguettevõtjad, hiljemalt
artiklis 10 sätestatud võimsuse arvutamise metoodika esitamise ajaks, välja töötama metoodika
ettepaneku piirkonnaülese võimsuse jagamiseks pikkade ajavahemike korral koordineeritud
viisil erinevates võimsuse jaotamise ajavahemikes vastavas piirkonnas. Ettepaneku üle tuleb
pidada konsultatsioone kooskõlas artikliga 6.
FCA artikli 16 lõike 2 järgi peab piirkonnaülese võimsuse jagamise meetod pikkade
ajavahemike korral vastama järgmistele tingimustele:
a) see peab vastama turuosaliste riskimaandamise vajadustele;
b) see peab olema kooskõlas võimsuse arvutamise metoodikaga;
c) see ei tohi kaasa tuua konkurentsi piiranguid, eelkõige seoses juurdepääsuga pikaajalistele
ülekandeõigustele.
Euroopa Parlamendi ja nõukogu määrusega (EL) 2019/942 asutati Euroopa Liidu
Energeetikasektorit Reguleerivate Asutuste Koostöö Amet (edaspidi ka ACERi määrus)3.
ACERi määruse artikli 5 lõike 3 järgi kui õigusaktiga nähakse ette ettepanekute koostamine
võrgueeskirjade ja suuniste rakendamise selliste tingimuste ja metoodika kohta, mis peavad
saama asjaomase piirkonna kõigi pädevate reguleerivate asutuste regulatiivse heakskiidu,
peavad nimetatud reguleerivad asutused saavutama ühehäälse kokkuleppe, kui see toimub ühe
järgmise õigusaktiga:
a) seadusandliku tavamenetluse kohaselt vastu võetud liidu õigusakt;
b) võrgueeskirjad ja suunised, mis on vastu võetud enne 4. juulit 2019 ning nende
3 Kättesaadav: https://eur-lex.europa.eu/legal-content/ET/TXT/?uri=CELEX%3A02019R0942-20250205
3 (5)
võrgueeskirjade ja suuniste hilisemad läbivaatamised, või
c) vastavalt määruse (EL) nr 182/2011 artiklile 5 rakendusaktidena vastu võetud
võrgueeskirjad ja suunised.
[…]
ACERi määruse artikli 5 lõike 6 alusel, vaatavad reguleerivad asutused või ACER, kui viimasel
on vastav pädevus, enne lõigetes 2 ja 3 osutatud tingimuste ja metoodika heakskiitmist
tingimused ja metoodika läbi ja muudavad neid vastavalt vajadusele, konsulteerides Euroopa
elektri põhivõrguettevõtjate võrgustikuga (ENTSO-E), Euroopa gaasi põhivõrguettevõtjate
võrgustikuga (ENTSOG) või ELi jaotusvõrguettevõtjate üksusega, et tagada nende kooskõla
võrgueeskirja või suunise eesmärgiga ning et need aitaksid kaasa turgude lõimimisele,
mittediskrimineerimisele, tõhusale konkurentsile ja turu nõuetekohasele toimimisele. ACER
võtab heakskiitmise otsuse vastu asjaomastes võrgueeskirjades ja suunistes sätestatud
ajavahemiku jooksul. See ajavahemik algab ettepaneku ACERile edastamise päevale järgnevast
päevast.
Haldusmenetluse seaduse (HMS) § 14 lõike 1 järgi esitatakse haldusmenetluse algatamiseks
haldusorganile vabas vormis avaldus (taotlus).
2. Menetlusosaline
Elering AS, äriregistri kood 11022625, asukoht Kadaka tee 42, Tallinn, 12915, e-post:
3. Asjaolud ja menetluse käik
06.02.2025 esitas Elering AS (edaspidi Elering) Konkurentsiametile kooskõlastamiseks
Soome, Eesti ja Läti põhivõrguettevõtjate (edaspidi ka põhivõrguettevõtjad) ühise metoodika
ettepaneku piirkonnaülese võimsuse jagamiseks pikkade ajavahemike korral koordineeritud
viisil erinevates võimsuse jaotamise ajavahemikes Balti koordineeritud võimsusarvutuse alas,
kooskõlas FCA artikli 16 lõikega 1 (metoodika). Viimane asjaomane riiklik reguleeriv asutus4
sai metoodika ettepaneku kätte 18.02.2025.
Põhivõrguettevõtjad on kooskõlas FCA artikliga 6 metoodika ettepanekut koos selgitava
dokumendiga ENTSO-E konsultatsioonikeskkonnas perioodil 14.11.2024 kuni 13.12.2024.5
19.06.2025 jõudsid kõik asjaomased riiklikud reguleerivad asutused kokkuleppele taotleda
metoodika ettepaneku muutmist FCA artikli 4 lõike 11 alusel. Kooskõlas FCA artikli 4 lõikega
9 konsulteerisid asjaomased riiklikud reguleerivad asutused omavahel, tegid tihedat koostööd
ja kooskõlastasid oma tegevust, et jõuda metoodika kooskõlastamise asjus kokkuleppele.
19.06.2025 edastas Konkurentsiamet Eleringile kirja muudatusnõuete kohta.
19.08.2025 esitas Elering Konkurentsiametile muudetud metoodika ettepaneku, mis oli ühiselt
heakskiidetud asjaomaste põhivõrguettevõtjate poolt. Viimane asjaomane riiklik reguleeriv
asutus sai metoodika ettepaneku kätte 20.08.2025.
4 Antud metoodika puhul asjaomasteks riiklikeks reguleerivateks asutusteks on Eesti, Läti ja Soome riiklikud
reguleerivad asutused. 5 Kättesaadav: https://consultations.entsoe.eu/markets/pfa-of-baltic-ccr-tsos-common-methodology/
4 (5)
23.09.2025 konsulteerisid asjaomased riiklikud reguleerivad asutused põhivõrguettevõtjatega
e-kirja vahendusel muudetud kujul metoodika ettepanekut. Eelnimetatud muudatused
käsitlevad muuhulgas täpsustust FCA määruse artikli 3 punkti g eesmärgi täitmise osas ning
põhimõtte eemaldamist, mis sätestaks aluse ja eelheakskiidu tulevase metoodikamuudatuse
jaoks. Detailsemalt on muudatuste sisu välja toodud asjaomaste riiklike reguleerivate asutuste
ühise seisukoha punktis 3 (Lisa 2).
07.10.2025 kiitsid asjaomased riiklikud reguleerivad asutused ühiselt põhivõrguettevõtjate
metoodika ettepaneku muudetud kujul (Lisa 1) heaks (Lisa 2).
4. Asjaomaste reguleerivate asutuste ühine seisukoht
Asjaomased riiklikud reguleerivad asutused on hinnanud põhivõrguettevõtjate esitatud
metoodika ettepanekut ning otsustasid enne metoodika ettepaneku kooskõlastamist muuta
metoodikat, FCA artikli 4 lõike 5 ja ACERi määruse artikli 5 lõike 6 alusel, et tagada metoodika
ettepaneku kooskõla FCA määrusega. Asjaomaste riiklike reguleerivate asutuste tehtud
muudatused metoodika ettepanekus puudutavad muuhulgas täpsustust FCA määruse artikli 3
punkti g eesmärgi täitmise osas ning põhimõtte eemaldamist, mis sätestaks aluse ja
eelheakskiidu tulevase metoodikamuudatuse jaoks. Detailsemalt on muudatuste sisu välja
toodud asjaomaste riiklike reguleerivate asutuste ühise seisukoha punktis 3 (Lisa 2).
Kokkuvõte
Konkurentsiamet töötas läbi 19.08.2025 Eleringi poolt ametile kooskõlastamiseks esitatud
Soome, Eesti ja Läti põhivõrguettevõtjate ühise metoodika ettepaneku piirkonnaülese võimsuse
jagamiseks pikkade ajavahemike korral koordineeritud viisil erinevates võimsuse jaotamise
ajavahemikes Balti koordineeritud võimsusarvutuse alas, kooskõlas FCA artikli 16 lõikega 1,
ning asub seisukohale, et pärast asjaomaste riiklike reguleerivate asutuste ühiselt sisse viidud
muudatusi, arvestab nimetatud dokument kehtivast seadusandlusest tulenevate alusetega ning
ei ole vastuolus FCAst tuleneva regulatsiooniga.
FCA artikli 4 lõike 13 alusel FCA määruse kohaste tingimuste ja meetodite väljatöötamise eest
vastutavad põhivõrguettevõtjad avaldavad need tingimused ja meetodid internetis pärast nende
heakskiitmist ameti või pädevate reguleerivate asutuste poolt, või kui heakskiitu ei ole vaja, siis
pärast nende tingimuste ja meetodite väljatöötamist, välja arvatud juhul, kui selline teave on
artikli 7 kohaselt konfidentsiaalne.
Arvestades eeltoodut ja tuginedes FCA artikli 4 lõikele 7 punktile b)
otsustan:
kooskõlastada Soome, Eesti ja Läti põhivõrguettevõtjate ühise metoodika ettepaneku
piirkonnaülese võimsuse jagamiseks pikkade ajavahemike korral koordineeritud viisil
erinevates võimsuse jaotamise ajavahemikes Balti koordineeritud võimsusarvutuse alas,
kooskõlas Komisjoni määruse (EL) 2016/1719, 26. september 2016, millega kehtestatakse
võimsuse jaotamise forvardturu eeskiri, artikli 16 lõikega 1, vastavalt käesoleva otsuse lisale 1.
Käesoleva otsusega mittenõustumise korral on õigus esitada kaebus otsuse tühistamiseks
Tallinna Halduskohtule. Kaebuse halduskohtule võib esitada 30 päeva jooksul arvates
käesoleva otsuse teatavaks tegemisest.
5 (5)
(allkirjastatud digitaalselt)
Evelin Pärn-Lee
peadirektor
Lisad:
1. Finnish, Estonian and Latvian TSOs of Baltic CCR TSOs’ Common Methodology for
Splitting Long-Term Cross-Zonal Capacity in Accordance with Article 16 of
Commission Regulation (EU) 2016/1719 of 26 September 2016 Establishing a
Guideline on Forward Capacity Allocation
2. Position paper by the Baltic States National Regulatory Authorities of Estonia, Finland
and Latvia on Finnish, Estonian and Latvian TSOs of Baltic CCR TSOs’ Common
Methodology for Splitting Long-Term Cross-Zonal Capacity in Accordance with
Article 16 of Commission Regulation (EU) 2016/1719 of 26 September 2016
Establishing a Guideline on Forward Capacity Allocation
Nimi | K.p. | Δ | Viit | Tüüp | Org | Osapooled |
---|---|---|---|---|---|---|