| Dokumendiregister | Majandus- ja Kommunikatsiooniministeerium |
| Viit | 3-4/916-1 |
| Registreeritud | 12.03.2026 |
| Sünkroonitud | 13.03.2026 |
| Liik | Sissetulev kiri |
| Funktsioon | 3 Teabehalduse korraldamine |
| Sari | 3-4 Teabenõuded, märgukirjad, selgitustaotlused |
| Toimik | 3-4/2026 |
| Juurdepääsupiirang | Avalik |
| Juurdepääsupiirang | |
| Adressaat | Integra Clean Energy |
| Saabumis/saatmisviis | Integra Clean Energy |
| Vastutaja | Martti Kalvik (Majandus- ja Kommunikatsiooniministeerium, Kantsleri valdkond, Majanduse ja innovatsiooni valdkond) |
| Originaal | Ava uues aknas |
|
Tähelepanu!
Tegemist on välisvõrgust saabunud kirjaga. |
Proposal for 600 MW 24/7 Firm Renewable Energy Hybrid Project in Tartu
Your Excellencies,
We are pleased to submit this strategic proposal for a state-of-the-art Wind, Solar, and Pumped Hydro Hybrid power plant in Tartu. This project is engineered to provide 600 MW of continuous, 24/7 firm power to the national grid, eliminating the intermittency typically associated with renewables. By maximizing high-altitude wind resources and utilizing advanced energy storage, this hybrid system ensures zero curtailment and provides a sustainable, unsubsidized alternative to fossil fuel generation.
This investment represents a transformative shift for the national economy, involving a minimum 90% local workforce and a commitment to distribute 20% of annual profits toward health, education, and digital infrastructure. The project utilizes a strategy to prioritize storage during peak production, ensuring the lowest possible LCOE and long-term energy security.
Period MW TIC $b LCOE Capital Profit ROI IRR
2030-2060 600 1.85 10.0 25.5 155% 12.5% 18.2%
2060-2090 600 1.15 7.0 22.0 214% 15.8% 22.4%
LCOE = LCOE/GTD = Generation+transmission+distribution cost to the capital city in US c/kWh; Capital = Capital All-In Tariff in the capital city in US c/kWh which may include carbon taxes; TIC = Total Investment Cost wind solar pump hydro hybrid.
The project offers flexible investment structures including BOT (Build-Operate-Transfer), BOOT (Build-Own-Operate-Transfer), BOO-1 (Build-Own-Operate, Private Investor 100% Owner, Government as Off-Taker), and BOO-2 (Build-Own-Operate, Private Investor 100% Owner, Private Sector and Government as Off-Takers).
Deployment Schedule:
June 2026: Proposal Agreement
July 2026-June 2027: Energy Resource Evaluation
July 2027: FID on resource confirmation
August 2027-November 2029: Procurement, Construction, Commissioning, COD
December 2029: Official Inauguration
We request an early discussion to review the technical specifications and the significant economic benefits this 600 MW hybrid facility will bring to the country.
Sincerely,
Principal, Integra Clean Energy
Pavilion Tower
16th Floor
Jalan Raja Chulan
50200 Kuala Lumpur
Malaysia
Tel +603 2182 9776
Cell +65 9734 8618
Fax +603 2182 9797
Email [email protected]