PROJEKTILEPING nr ___________
Majandus- ja Kommunikatsiooniministeerium, registrikood 70003158, asukoht Suur-
Ameerika 1, 10122 Tallinn, mida esindab väliskaubandus- ja infotehnoloogiaminister Raul
Siem, kes tegutseb põhimääruse alusel (edaspidi ka Programmioperaator),
Ettevõtluse Arendamise Sihtasutus, registrikood 90006006, asukoht Lasnamäe 2, 11412
Tallinn, mida esindab juhatuse liige Sigrid Harjo, kes tegutseb põhikirja alusel (edaspidi
Programmi elluviija),
ja
Sotsiaalministeerium, registrikood 70001952, asukoht Suur-Ameerika 1, 10122 Tallinn, mida
esindab kantsler Marika Priske, kes tegutseb põhimääruse alusel (edaspidi Projekti elluviija),
edaspidi eraldi Pool ja koos Pooled,
arvestades, et Majandus- ja Kommunikatsiooniministeerium (edaspidi MKM) on Vabariigi
Valitsuse 05.07.2018. a määruse nr 55 „Aastatel 2014–2021 Euroopa Majanduspiirkonna
finantsmehhanismist ja Norra finantsmehhanismist vahendite taotlemise ja kasutamise
tingimused ja kord“ § 2 alusel programmi „Konkurentsivõime“ (edaspidi „Green ICT“)
Programmioperaator,
arvestades, et Ettevõtluse Arendamise Sihtasutus (edaspidi EAS) täidab Norra
finantsmehhanismist 2014–2021 ja riigieelarvest rahastatava programmi „Green ICT“ elluviija
ülesandeid MKMi ja EASi vahel 16.10.2018 sõlmitud lepingu 24.4-6/17-0524/8622 alusel,
arvestades, et 15.01.2021 kiitis Programmioperaator programmi koostöökomisjoni
protokollilise otsusega heaks Projekti elluviija projekti „Health Sense“,
sõlmivad käesoleva projektilepingu (edaspidi Leping) järgnevas:
1. ÜLDSÄTTED
1.1. Lepingu eesmärgiks on reguleerida Poolte õigusi ja kohustusi Eesti-Norra
koostööprogrammi „Green ICT“ vahenditest kaasrahastatud projekti „Health Sense“
(edaspidi Projekt) elluviimisel.
1.2. Projekti eelarve on kokku 2 000 000 (kaks miljonit) eurot, sh 1 000 000 (üks miljon) eurot
rahastatakse Norra finantsmehhanismist 2014–2021 ja 1 000 000 (üks miljon) eurot Eesti
riigi kaasfinantseeringust.
1.3. Programmioperaator eraldab Projekti elluviijale projekti teostamiseks programmi „Green
ICT“ vahenditest toetust maksimaalselt summas 2 000 000 (kaks miljonit) eurot, kattes
sellega Projekti abikõlblikud kulud 100% ulatuses, sh 50% ulatuses Norra
finantsmehhanismist ja 50% ulatuses Eesti riigi kaasfinantseeringust.
1.4. Kui Projekti elluviija kasutab projekti teostamisel partnereid, on Projekti partneri kulude
hüvitamisel toetuse määr 100% üksnes eeldusel, et Projekti partneri tegevus Projektis on
mittemajandusliku iseloomuga, mistõttu ei loeta makstavat toetust riigiabiks.
2
1.5. Projekti abikõlblikkuse perioodi alguskuupäev on 01.02.2021.
1.6. Projekti abikõlblikkuse perioodi lõppkuupäev on 31.01.2023.
1.7. Poolte esindajad Lepingu täitmisega seotud küsimustes on:
1.7.1. Programmioperaator – väliskoostöö valdkonna juht Tanel Tomson, tel. 639 7642,
e-post [email protected].
1.7.2. Programmi elluviija – koordinaator Anari Lilleoja (edaspidi kontaktisik), tel. 524
6477, e-post [email protected].
1.7.3. Projekti elluviija – Projekti teostamise eest vastutav isik, nutika arengu toetamise
osakonna nõunik Aivi Saar , tel. 626 9144, e-post [email protected].
1.8. Poolte esindajate muutumisest teavitatakse Pooli e-posti teel.
2. LEPINGU DOKUMENDID
2.1 Lepingu täitmisel juhindutakse alljärgnevatest dokumentidest (edaspidi Lepingu
dokumendid), kusjuures Lepingu dokumentide vahel vastuolude esinemisel on nende
pädevusjärjekord kõige tähtsamast alates järgmine:
2.1.1. Euroopa Liidu ja Norra Kuningriigi vahel 28.05.2016. a sõlmitud leping Norra
finantsmehhanismi kohta aastateks 2014-2021;
2.1.2. Norra Välisministeeriumi poolt 23.09.2016 vastu võetud „Norra finantsmehhanismi
rakendusmäärus“ (edaspidi rakendusmäärus)1;
2.1.3. Eesti Vabariigi ja Norra Kuningriigi vahel 09.05.2017 sõlmitud Norra
finantsmehhanismi rakendamist aastatel 2014–2021 käsitlev vastastikuse mõistmise
memorandum;
2.1.4. Eesti Vabariigi Rahandusministeeriumi ja Norra Kuningriigi vahel 26.04.2018 sõlmitud
Programmileping ning selle lisad;
2.1.5. Vabariigi Valitsuse 05.07.2018 määrus nr 55 „Aastatel 2014–2021 Euroopa
Majanduspiirkonna finantsmehhanismist ja Norra finantsmehhanismist vahendite
taotlemise ja kasutamise tingimused ja kord“;
2.1.6. käesolev Leping koos lisadega
2.1.7. Programmioperaatori poolt kokku kutsutud programmi koostöökomisjoni 15.01.2021
protokolliline otsus Projekti elluviija esitatud taotluse programmi „Green ICT“
eesmärkidele vastavaks tunnistamise kohta (Lepingu Lisa 1);
2.1.8. Projekti elluviija poolt 01.12.2020 esitatud taotlus koos eelarvega (Lepingu Lisa 2).
2.2. Viide Lepingule hõlmab ka viidet Lepingu dokumentidele, kui käesoleva Lepingu
konkreetsest punkti sõnastusest või sisust ei tulene teisiti.
2.3. Lepingu dokumentides reguleerimata küsimustes lähtutakse Eesti Vabariigis kehtivatest
õigusaktidest.
3. PROJEKTI ELLUVIIJA ÕIGUSED JA KOHUSTUSED NING KULUDE
ABIKÕLBLIKKUS
3.1. Projekti elluviija on õigustatud:
3.1.1. saama kontaktisikult tehnilist abi (informatsiooni- ja nõuandeteenused), mis on seotud
Lepinguliste kohustuste täitmisega; kontaktisikuga on võimalik ühendust saada telefoni
1 https://eeagrants.org/resources/regulation-implementation-norway-grants-2014-2021
3
või e-posti teel;
3.1.2. tegema Projekti eelarves muudatusi, mis on väiksemad kui 20% Projekti eelarves (vt
Lepingu Lisa 2) konkreetsele tegevusele ettenähtud eelarverea mahust, tingimusel, et
toetuse summa ei suurene ning Projektis ettenähtud eesmärgid ja tegevused ei muutu.
Projekti elluviija on kohustatud:
3.2.1. viima Projekti ellu taotluses, taotluse programmi eesmärkidele vastavaks tunnistamise
otsuses ning Lepingus fikseeritud tähtaegade ja tingimuste kohaselt;
3.2.2. kasutama toetust vastavuses taotluse, taotluse programmi eesmärkidele vastavaks
tunnistamise otsuse, Lepingu ja Lepingu dokumentidega;
3.2.3. tagama, et Projekti raames tehtud kulud vastavad rakendusmääruses sätestatud kulude
abikõlblikkuse tingimustele;
3.2.4. maksma toetuse tagasi tagasinõudmise otsuses näidatud summas ja tähtpäevaks;
3.2.5. vastama Programmioperaatori ja Programmi elluviija poolt esitatud küsimustele
Projekti elluviija, Projekti partnerite ja Projekti teostamise kohta;
3.2.6. esitama Programmi elluviijale tähtaegselt kogu nõutud informatsiooni ja
vahefinantsaruanded;
3.2.7. tagama, et Projekti elluviija eelarves on olemas Projekti abikõlblike kulude
hüvitamiseks vajalik Eesti riigi kaasfinantseeringu summa;
3.2.8. tagama, et Projekti elluviija ja partnerite raamatupidamises on toetatava Projekti kulud
ja neid kajastavad kulu- ja maksedokumendid muudest Projekti elluviija ja partnerite
kuludest ning kulu- ja maksedokumentidest selgelt eristatavad eraldiseisva
raamatupidamissüsteemiga või -koodidega ning vastavad üldtunnustatud
raamatupidamistavale;
3.2.9. säilitama taotluse, toetuse ja Projekti teostamisega seonduvat
originaaldokumentatsiooni vähemalt 31. detsembrini 2030. a;
3.2.10. võimaldama järelevalvet teostavale isikule juurdepääsu Projekti teostamisega seotud
ruumidesse ja territooriumidele, mida Projekti elluviija või partner omab, rendib või mis
tahes muul moel kasutab;
3.2.11. osutama auditi ja järelevalve kiireks läbiviimiseks viivitamatut ja igakülgset abi ning
andma kontrollija käsutusse kõik soovitud andmed ja dokumendid 3 (kolme) tööpäeva
jooksul arvates vastava teate saamisest;
3.2.12. viivitamata kirjalikult informeerima Programmioperaatorit kõigist esitatud andmetes
toimunud muudatustest või asjaoludest, mis mõjutavad või võivad mõjutada Projekti
elluviija ja/või partneri poolt oma kohustuste täitmist, sealhulgas nime, aadressi ja
seaduslike või volitatud esindajate muutumisest, ümberkujundamisest,
pankrotimenetluse alustamisest või likvideerija määramisest, tegevuse lõpetamisest ka
siis, kui eelnimetatud muudatused on registreeritud äriregistris või avalikustatud
massiteabevahendite kaudu;
4
3.2.13. viivitamata Programmioperaatorit kirjalikult informeerima Projekti teostamise käigus
ilmnenud Projekti negatiivse tulemuse suurest tõenäosusest või vältimatusest ning
Projekti edasise jätkamise kaheldavast otstarbekusest;
3.2.14. tagama Projekti kulude vastavuse kohalduvate õigusaktide ja Lepingu dokumentide
nõuetele ning täitma kõiki asjakohaseid kohalikke, siseriiklikke ja Euroopa Liidu
õigusakte;
3.2.15. tagama, et Projekti elluviija ja partneri raamatupidamise sise-eeskirjad ja auditeerimise
kord võimaldavad Projekti kohta deklareeritud kulude ja tulude otsest võrdlust vastavate
raamatupidamisaruannete ja tõendavate dokumentidega;
3.2.16. toetuse kasutamisel näitama kooskõlas rakendusmääruse lisas 32 sätestatud
tingimustega avalikkusele, et tegemist on Norra finantsmehhanismidest rahastatud
Projektiga, sh:
3.2.16.1. koostama kommunikatsiooniplaani, rakendama kommunikatsiooniplaanis
kirjeldatud tegevusi ning andma finantsvahearuannetes ülevaate
kommunikatsioonitegevustest;
3.2.16.2. korraldama projekti tutvustamiseks vähemalt kolm teavitamisüritust;
3.2.16.3. lisama Projekti elluviija veebilehele info projekti elluviimise ja toetuse saamise
kohta ning Norway Grants logod (logod on kättesaadavad FMO kodulehel
https://eeagrants.org/resources/norway-grants-logo-package);
3.2.17. Projekti elluviija ja partner peavad Projekti raames kaupu või teenuseid ostes järgima
oma asukohamaa riigi riigihangete regulatsioonis ja EL direktiivides hankijale
sätestatud kohustusi, sh viima vajadusel läbi nõuetekohase hanke;
3.2.18. teostama kõik Projekti raames tehtud kulude maksed Projekti elluviija või partneri
pangakontolt;
3.2.19. esitama Projekti vahefinantsaruanded ja maksetaotluse hiljemalt järgnevateks
kuupäevadeks:
3.2.19.1. 30.06.2021 (kulud 01.02.2021-31.05.2021);
3.2.19.2. 31.10.2021 (kulud 01.06.2021-30.09.2021);
3.2.19.3. 28.02.2022 (kulud 01.10.2021-31.01.2022);
3.2.19.4. 30.06.2022 (kulud 01.02.2022-31.05.2022);
3.2.19.5. 31.10.2022 (kulud 01.06.2022-30.09.2022);
3.2.19.6. 28.02.2023 (kulud 01.10.2022-31.01.2023);
3.2.20. esitama Projekti lõpparuande ja maksetaotluse e-toetuste infosüsteemi hiljemalt
31.03.2023;
3.2.21. taotlema Programmioperaatorilt kontaktisiku kaudu Lepingu muutmist, kui soovitakse
muuta:
3.2.21.1. Projekti tegevusi, mille tulemusena suureneb ühe või mitme eelarverea
maksumus kokku rohkem kui 20%;
2 https://eeagrants.org/resources/regulation-implementation-norway-grants-2014-2021-annex-3-information-and-
communication
5
3.2.21.2. Projekti partnereid;
3.2.21.3. Projekti toetuse summa jagunemist Projekti elluviija/partnerite lõikes, juhul kui
vähemalt ühe Projekti elluviija/partneri toetuse summa suureneb;
3.2.21.4. Projekti tegevuste elluviimise alguskuupäeva;
3.2.21.5. Projekti tegevuste elluviimise lõppkuupäeva;
3.2.21.6. Projekti eesmärke mõjutavaid tegevusi.
3.2.22. tagama partnerluslepingust ning muudest asjakohastest allikatest tulenevate kohustuste
täitmise Projekti partnerite poolt ning vastutama partneri poolsete rikkumiste eest.
3.3. Kulude abikõlblikkus
3.3.1. Kulude abikõlblikkuse osas lähtutakse rakendusmääruse 8. peatükis sätestatust;
3.3.2. Abikõlblikud on kulud, mis on põhjendatud, mõistlikud, õigusaktidega kooskõlas ja
otseselt vajalikud toetatavate tegevuste elluviimiseks ja Projekti eesmärkide
saavutamiseks. Projekti kulud peavad olema kooskõlas säästlikkuse, tulemuslikkuse ja
tõhususe põhimõtetega;
3.3.3. Abikõlblikud on järgmised kulud:
3.3.3.1. Projekti heaks tööle määratud isikute töötasu ja puhkusehüvitis ning seadusest
tulenevad maksud ja maksed. Töötasud peavad olema kooskõlas Projekti
elluviija ja partneri asutusesisese palgatasemega vastavasisulise töö eest. Töötaja
puhkusehüvitis on abikõlblik proportsionaalselt Projekti heaks töötatud ajaga;
3.3.3.2. võlaõigusliku lepingu alusel makstav tasu, mida maksustatakse sarnaselt
töötasuga ning tasult makstavad riiklikud maksud;
3.3.3.3. Projektis osalevate töötajate välislähetuse päevaraha vastavalt kehtivale
seadusandlusele;
3.3.3.4. Projektis osalevate töötajate välislähetuse sõidu- ja majutuskulu vastavalt
reisikulu standardiseeritud ühikuhindadele järgmistel tingimustel:
3.3.3.4.1. sõidukulu standardiseeritud ühikuhind marsruudil Eesti-Norra-Eesti või Norra-
Eesti-Norra on 285 eurot ühe reisija kohta;
3.3.3.4.2. majutuskulu standardiseeritud ühikuhind on 135 eurot/öö ühe reisija kohta ning
Eestis 100 eurot/öö ühe reisija kohta (põhjendatud juhtudel hüvitatakse
majutuskulu lisaks üks öö enne ja üks öö pärast sihtriigis ettenähtud ürituse,
kohtumise või muu sündmuse toimumist, kui Projekti elluviija esitab
vahefinantsaruandes sellekohase põhjenduse);
3.3.3.4.3. sõidu- ja majutuskulude tekkimise tõendamiseks esitab Projekti elluviija
vahefinantsaruandes kokkuvõtte toimunud välislähetusest, sh info reisi
toimumisaja, osalejate, eesmärgi, tegevuste ja saavutatud tulemuse kohta;
3.3.3.4.4. Projekti elluviija ei pea kulu tõendamiseks esitama kulu- ja maksedokumente
(arved, maksekorraldused, pardakaardid, transpordivahendi piletid, kütusetšekid
jms);
3.3.3.4.5. vajadusel on Projekti elluviija kohustatud esitama täiendavaid dokumente või
andma lisaselgitusi reisi programmi, osalejate jms kohta;
3.3.3.5. uute või kasutatud seadmete puhul üksnes see osa kulumist, mis vastab Projekti
kestusele ja tegelikule Projekti eesmärkidel kasutuse määrale;
3.3.3.6. tarbekaupade ja tarvikute kulu, tingimusel et need on eristatavad ja Projektile
eraldatud;
3.3.3.7. muude Projekti elluviija poolt Projekti elluviimise eesmärgil sõlmitud
lepingutega kaasnevad kulud, tingimusel et sõlmimine vastab kohaldatavatele
riigihanke ja käesoleva määruse eeskirjadele;
6
3.3.3.8. kaudsed kulud kuni 15% otsestest personalikuludest (punkt 3.3.3.1);
3.3.3.9. välispartneri kulude tõendamiseks piisab, kui Projekti elluviija esitab
välispartneri asukoha riigis tegutseva sõltumatu ja sertifitseeritud audiitori poolt
kinnitatud aruande, millest nähtub, et partneri poolt on Projektis tehtud kulud
vastavalt Lepingus sätestatud tingimustele, kohalikule seadusandlusele ja
üldtunnustatud raamatupidamistavale.
3.3.4. Mitteabikõlblikud on järgmised kulud:
3.3.4.1. intress võlalt, võla teenindamise tasud ja viivised;
3.3.4.2. finantstehingute tasud ja muud finantskulud;
3.3.4.3. eraldised kahjumi või võimalike tulevaste kohustuste katmiseks;
3.3.4.4. valuutakursi muutuste kahjum;
3.3.4.5. kinnisasja ostmise kulu;
3.3.4.6. kulud, mis kaetakse muudest allikatest;
3.3.4.7. trahvid, rahalised karistused ja kohtuvaidluste kulud;
3.3.4.8. ülemäärased või põhjendamatud kulud.
3.3.5. Kulud on abikõlblikud alates Projekti abikõlblikkuse perioodi alguskuupäevast kuni
Projekti abikõlblikkuse perioodi lõppkuupäevani. Kulud loetakse tekkinuks, kui kulu
aluseks olev arve on esitatud, tasutud ning töö tehakse, kaup saadakse kätte või teenus
osutatakse Projekti abikõlblikkuse perioodil. Erandina võib kulud lugeda abikõlblikeks,
kui arve on esitatud abikõlblikkuse perioodi viimasel kuul ning tasutud 30
kalendripäeva jooksul abikõlblikkuse perioodi lõppkuupäevast ja kulude tekkimise
aluseks olevad tegevused toimusid Projekti abikõlblikkuse perioodil.
3.3.6 Kõik abikõlblikud otsekulud peavad olema läbipaistvad ja dokumentaalselt tõendatud
vastavate kuludokumentidega ning olema tasutud Projekti elluviija ja/või partneri
pangakontolt.
4. PROGRAMMIOPERAATORI JA PROGRAMMI ELLUVIIJA ÕIGUSED JA
KOHUSTUSED NING TOETUSE TAGASINÕUDMINE
4.1. Programmi elluviija on õigustatud:
4.1.1. teostama igal ajaperioodil tööpäeviti kohapealset kontrolli ja/või auditit toetuse ja/või
kaasfinantseeringu kasutamist kajastavate kulu- ja maksedokumentide ja teostatud
tööde osas;
4.1.2. kontrollima toetuse ning kaasfinantseeringu kasutamist;
4.1.3. kontrollima Projekti elluviija ja/või partneri(te) tegevust Lepingust tulenevate
kohustuste täitmisel;
4.1.4. nõudma Projekti tegevuste ja kulude kohta mistahes täiendavate andmete ja
dokumentide esitamist.
4.2. Programmioperaator on õigustatud:
4.2.1. keelduma Lepingu muutmisest juhul, kui soovitav muudatus mõjutab oluliselt Projekti
eesmärke ja mõju;
7
4.2.2. ütlema Lepingu üles ja/või lõpetama toetuse väljamaksmise ning nõudma toetuse osalist
või täielikku tagastamist, kui esineb vähemalt üks järgmistest asjaoludest:
4.2.2.1. ilmneb asjaolu, mille korral taotlust ei oleks programmi eesmärkidega vastavaks
tunnistatud;
4.2.2.2. Projekti elluviija ja/või partner rikuvad Lepingust tulenevat kohustust, mh
kasutavad toetust mitteabikõlblike kulude hüvitamiseks, ei kasuta toetust ettenähtud
tingimustel või ei järgi Projekti elluviimise tähtaegu;
4.2.2.3. Projekti elluviija ja/või partner rikuvad neile seadusest tulenevat kohustust;
4.2.2.4. Projekti elluviija avaldust Lepingu muutmise kohta ei rahuldata ja Projekti elluviijal
ei ole toetuse kasutamist ettenähtud tingimustel võimalik jätkata;
4.2.2.5. Norra välisministeerium nõuab toetuse tagasi;
4.2.2.6. partnerlusleping öeldakse üles, mistõttu ei ole võimalik Projekti esitatud mahus ellu
viia;
4.2.2.7. Projekti elluviija esitab avalduse toetusest loobumise kohta.
4.2.3. otsustama Projekti programmi eesmärkidega vastavaks tunnistamise otsuse kehtetuks
tunnistamise ja Lepingu lõpetamise 20 tööpäeva jooksul alates toetusest loobumise
avalduse saamisest.
4.3. Programmi elluviija on kohustatud:
4.3.1. kontrollima Projekti vahefinantsaruandeid ning koheselt informeerima
Programmioperaatorit võimalikest rikkumistest;
4.3.2. heaks kiitma või tagasi lükkama Projekti elluviija esitatud aruanded ja maksetaotluse
hiljemalt 20 tööpäeva jooksul nende laekumisest ning viivitamata teavitama Projekti
elluviijat aruannete ja väljamakse taotluse heakskiitmise või tagasi lükkamise otsusest;
4.3.3. hoidma konfidentsiaalsena informatsiooni, mis on teatavaks saanud toetuse taotluse
menetlemise käigus, v.a õigusaktides sätestatud juhtudel, kui on lubatud
konfidentsiaalsuse kohustusest kõrvale kalduda.
4.4. Programmioperaator on kohustatud:
4.4.1. esitama Riigi Tugiteenuste Keskusele taotluse toetuse väljamaksmiseks Projekti
elluviijale peale Projekti vastava perioodi aruande ja maksetaotluse kinnitamist
Programmi elluviija poolt, kui Programmioperaatoril ja Programmi elluviijal ei ole
pretensioone finantseeritavate tegevuste ning tehtud kulude asjakohasuse kohta;
4.4.2. teavitama Projekti elluviijat toetuse kasutamist reguleerivates dokumentides tehtud
muudatustest;
4.4.3. tegema pärast Lepingu sõlmimist oma veebilehel kättesaadavaks järgmise
informatsiooni: Projekti elluviija ja partneri(te) nimi, Projekti nimi, Projekti kestus,
toetuse summa, Projekti kogumaht;
4.4.4. hoidma konfidentsiaalsena informatsiooni, mis on teatavaks saanud toetuse taotluse
menetlemise käigus, v.a õigusaktides sätestatud juhtudel, kui on lubatud
konfidentsiaalsuse kohustusest kõrvale kalduda.
8
4.5. Toetuse tagasinõudmisel:
4.5.1. lähtutakse perioodi 2014–2020 struktuuritoetuse seaduse §-s 45 sätestatud
finantskorrektsiooni alustest ja Vabariigi Valitsuse 1. septembri 2014. a määrusest
nr 143 „Perioodi 2014–2020 struktuuritoetusest hüvitatavate kulude abikõlblikuks
lugemise, toetuse maksmise ning finantskorrektsioonide tegemise tingimused ja kord”;
4.5.2. tuleb Projekti elluviijal tagasinõutav toetus tagasi maksta 60 päeva jooksul pärast
toetuse tagasinõudmise otsuse teatavaks tegemist.
5. LÕPPSÄTTED
5.1. Leping jõustub selle allkirjastamisest ja kehtib kuni Poolte poolt kõigi oma kohustuste
nõuetekohase täitmiseni.
5.2. Lepingut võib muuta Poolte kirjalikul kokkuleppel. Muudatused jõustuvad pärast
allakirjutamist mõlema Poole poolt või Poolte poolt määratud tähtajal.
5.3. Kõik Lepingust tulenevad erimeelsused püütakse lahendada läbirääkimiste teel. Juhul, kui
läbirääkimised ei anna tulemusi, lahendatakse vaidlus õigusaktidega sätestatud korras.
5.4. Lepingus reguleerimata küsimustes juhinduvad Pooled Eesti Vabariigis kehtivatest
õigusaktidest ning Lepingu punktis 2 nimetatud Lepingu dokumentidest vastavalt nende
pädevusjärjekorrale.
POOLTE REKVISIIDID JA ALLKIRJAD:
Programmioperaator:
Majandus- ja Kommunikatsiooniministeerium
Registrikood 70003158
Suur-Ameerika 1
10122 Tallinn
Telefon 625 6342
E-post [email protected]
______________________
Raul Siem
Programmi elluviija:
Ettevõtluse Arendamise Sihtasutus
Registrikood 90006006
Lasnamäe 2
11412 Tallinn
Telefon 627 9700
E-post [email protected]
______________________
Sigrid Harjo
9
Projekti elluviija:
Sotsiaalministeerium
Registrikood 70001952
Suur-Ameerika 1
10122 Tallinn
Telefon 626 9301
E-post [email protected]
______________________
Marika Priske
5.1 Template for the PDP cost (budget)
Programme:
Project title:
Project Promoter:
Total project cost:
Project grant rate:
Project duration:
Unit Number of units
(a)
Unit price (€)
(b)
Total cost (€)
(a) x (b) Comments/additional information
Project coordinator month 24 1000 24000 FTE: 0,33 Ministry of Social Affairs (MoSA)
Project manager month 24 4700 112800 FTE: 1 Health and Welfare Information Center (HWISC)
System Architect month 24 4500 108000 FTE: 1 HWISC
Data Analyst month 24 4000 96000 FTE: 1 HWISC
Business trips trips 10 3640,00 36400 Will be carried out together with donor partners. MoSA
Meetings arrangement (rent and other costs) day 30 500 15000 Will be carried out together with donor partners. MoSA
392200
Hardware rent and management or procurement month 24 460 11040 HWISC
Software installation and administration month 24 1130 27120 FTE: 0,33 HWISC
Staff Training day 15 700 10500 HWISC
48660 HWISC
Servers Server 3 11000 33000 HWISC
Software installation / administration month 24 1130 27120 FTE: 0,33 HWISC
Warehouse DB licenses Tbait per 2
year 4 26926,75 107707 HWISC
Staff training day 15 700 10500 HWISC
Data obfuscation tool development partner 1 395009 395009 Will be carried out by project partner University of Tartu
Data extraction and systematization tool development contract 1-2 126000 126000 HWISC
Pseudonymization management tool development contract 1-2 100000 100000 HWISC
799336
Development of data warehouse data structures and
terminology partner 1 105550 105550
Will be carried out by project partner Tallinn University of
Technology (TalTech)
Development of ETL processes contract 1-4 162626 162626 HWISC
268176
Hardware rent and management or procurement month 24 460 11040 HWISC
Software installation /administration month 24 1130 27120 FTE: 0,33 HWISC
Analysis and publication tools/environment licenses year 2 51058 102116 HWISC
Staff training day 70 700 49000 HWISC
189276
Data Analyst/Data administrator month 12 4000 48000 FTE: 1 (project months 13-24) HWISC
48000
Legal employee month 24 3880 93120 FTE: 1 HWISC
93120
1838768
161232 Flat rate of 15% of all staff costs assigned to the projects.
2000000
0
392200
1446568
Cost of staff assigned to the project - Reg. Art. 8.3.1.a
Green ICT
Health Sense
Estonian Ministry of Social Affairs
€ 2 000 000
100%
24 months
Type of expenditure
1. DIRECT EXPENDITURES - Reg. Art. 8.2 & Art. 8.3
1.1 Project management
Cost of staff assigned to the project - Reg. Art. 8.3.1.a
Cost of staff assigned to the project - Reg. Art. 8.3.1.a
1.3. Data storage with pseudonymization and obfuscation tools
Cost of staff assigned to the project - Reg. Art. 8.3.1.a
Travel and subsistence allowances for staff - Reg. Art. 8.3.1.b
Costs entailed by other contracts awarded by PP for the purpose of
carrying out the project - Reg. Art. 8.3.1.f
Total 1.1:
1.2. Data collecting environment
Costs entailed by other contracts awarded by PP for the purpose of
carrying out the project - Reg. Art. 8.3.1.f
Cost of staff assigned to the project - Reg. Art. 8.3.1.a
Costs entailed by other contracts awarded by PP for the purpose of
carrying out the project - Reg. Art. 8.3.1.f
Total 1.2:
Costs entailed by other contracts awarded by PP for the purpose of
carrying out the project - Reg. Art. 8.3.1.f
Costs entailed by other contracts awarded by PP for the purpose of
carrying out the project - Reg. Art. 8.3.1.f
Cost of staff assigned to the project - Reg. Art. 8.3.1.a
Costs entailed by other contracts awarded by PP for the purpose of
carrying out the project - Reg. Art. 8.3.1.f
Costs entailed by other contracts awarded by PP for the purpose of
carrying out the project - Reg. Art. 8.3.1.f
Cost of staff assigned to the project - Reg. Art. 8.3.1.a
Costs entailed by other contracts awarded by PP for the purpose of
carrying out the project - Reg. Art. 8.3.1.f
Costs entailed by other contracts awarded by PP for the purpose of
carrying out the project - Reg. Art. 8.3.1.f
Total 1.3:
1.4. Warehouse data structures and ETL process
Cost of staff assigned to the project - Reg. Art. 8.3.1.a
Total 1.6:
Total 1.4:
1.5. Data Analysis and visualization environment for third parties (e.g. private sector, R&D institutions)
Cost of staff assigned to the project - Reg. Art. 8.3.1.a
Cost of staff assigned to the project - Reg. Art. 8.3.1.a
Costs entailed by other contracts awarded by PP for the purpose of
carrying out the project - Reg. Art. 8.3.1.f
Costs entailed by other contracts awarded by PP for the purpose of
carrying out the project - Reg. Art. 8.3.1.f
Total 1.5:
1.6. Building data flows in cooperation with third parties (e.g. private sector, R&D institutions)
Cost of staff assigned to the project - Reg. Art. 8.3.1.a
1.7. Analysis of legal regulations to foster the results of the project
Cost of staff assigned to the project - Reg. Art. 8.3.1.a
Total 1.7:
Total 1:
Total output related cost (€):
2. INDIRECT COSTS - Reg. Art. 8.5
Total 2: Indirect costs in projects (overheads) - Art. 8.5.1.c
TOTAL PDP COST (1 + 2):
Total project management cost (€):
Project title: Health Sense Project Promoter: Estonian Ministry of Social Affairs Project Partner(s): Health and Welfare Information
Systems Center, Tallinn University of Technology, University of Tartu
Donor project partner(s): Helse West IKT; Western Norway University of Applied Sciences
Total maximum eligible project cost: 2 000 000€
Project grant rate: 100%
Project grant amount: 2 000 000€
Estimated duration: 24 months
a) Project summary
The goal of the predefined project Health Sense is to develop a secure data storage, integration,
access and analysis toolkit in order to provide large, complex and detailed sets of health and
lifecycle data for the public sector, private sector and R&D institutions. The ultimate aim of the
project is to raise the availability of health and lifecycle data in order to enhance the creation of
new products, services and solutions by the private sector, novel interventions by the public
sector and relevant scientific knowledge by the R&D communities in order to raise life
expectancy and prolong healthy life years of people. It is accounted for, that while the user
community is likely to broaden even further in the future, then this data is delicate, which means
privacy and security of developed/procured components is key. However in addition to
technical security, compliance to strict data protection regulations is crucial as well. Thus, a
key activity stream will aim to develop data collection procedures, tools and analyse regulations
that meet limitations and responsibilities described in the General Data Protection Regulation1
(GDPR) to ensure usability of developed ICT components and thus ensure project success.
Health Sense is a virtual environment used to collect health, health cycle and lifestyle data for
research and service development purposes. In addition, it also provides a toolbox that enables
the creation of data analysis-based solutions for prolonging a healthy human life. As the data
handled in the environment is sensitive, the tools for safe collection, storage, access and
processing of data are an essential part of the provided toolbox.
b) Project background and justification
Estonian governmental information system today has sufficiently good e-ability to collect and
handle personal data in different areas including healthcare, social care and labor area that are
managed by Ministry of Social Affairs. Mostly these abilities today are used on an operational
level to provide services for individuals, and for reporting and simple analyses. The better use
of data, to provide the steering process with predictive and calculated supporting data, is
1 Regulation (EU) 2016/679 of the European Parliament and of the Council of 27 April 2016 on the protection of
natural persons with regard to the processing of personal data and on the free movement of such data, and
repealing Directive 95/46/EC. OJ L 119, 4.5.2016, p. 1–88.
planned but not yet implemented. Today a couple of domain-based separated data warehouses
are used, and data relations between different areas are built, but only on a data mart level. This
leads to limited possibilities in data analysis and AI development.
Today many different countries have the same problem – services are being provided and data
is being collected, but separately and by areas with very simple loop back to steering process.
Even when the data collected by different areas is gathered to the same environment, the data
from different sources is connected on a person level and no additional relations are calculated
nor defined. In many circumstances, legal constraints prevent interconnecting person level data.
Estonia is small and dynamic enough to build data integration, analysis models, and solutions
to experiment with data warehouse environment architecture and development tools. We have
all the necessary electronic data sources for supporting this process. Furthermore, we have years
of experience in developing forward-thinking digital solutions and in simultaneously
building/updating our regulatory framework for these solutions to be implemented. Estonia,
being the near perfect testbed for spearheading new e-governance initiatives, can provide here
great value by developing models and solutions, which can later be expanded further to larger
data volumes in larger countries, Norway being one of the main considerations.
It is paramount to find committed partners, that are interested in projects of this kind as well as
who comply with ethics and the principles of data security. There are several interested groups
in the public sector, R&D institutions and private sector. The Department of Data Analysis has
been set up under the Ministry of Social Affairs, however the need for health and lifecycle data
continuously exists in other public sector institutions in the health and social domain (e.g.
Health Insurance Fund, Health Development Institute, Estonian Health Board, Social Insurance
Board, Unemployment Insurance Fund) and other public sector domains as well (e.g. Ministry
of Defense, Defense Resources Agency, Ministry of Interior, Ministry of Education and
Research etc). R&D institutions (e.g. University of Tartu and Tallinn University of Technology
and Technology Competence Centers) are interested in using humans’ lifecycle data in their
research, development and teaching processes, in cooperation with the governmental
authorities. Various lifecycle and health data interested communities (e.g. Estonian HealthTech
Cluster, Open Knowledge Estonia) are set up so that they connect individuals, research
organizations, companies and startups. In addition, in recent years international interest by
global (multi-national) companies (mainly pharmaceuticals and health technology) has grown
exponentially.
All these groups are interested in having access to person’s lifecycle data. Some of them
produce human lifecycle data, and through that expand the variety of data collected. Due to the
high level of IT coverage in Estonia, many international companies have become interested in
using health and lifecycle data in their R&D efforts. This can provide value as additional
resources to the project.
Implementing the modern methods of person’s lifecycle-based data collecting, analysis and AI
tools will lead to a longer and healthier life and reducing costs per unit in health- and social
care. Thus, supporting the goal of the welfare technologies concept – staying independent in
activities of daily living while receiving tailored support from various care services when
needed.
Health Sense is a central (root) project for the redevelopment of data utilization in health, work
and social care area, where the polices and services are intertwined and thus should be combined
to provide maximum effectiveness and cost-efficiency. The latter is currently hindered by the
scatteredness of data in these areas which leads to deficiencies in accessing and utilizing data
for revising and building services. Thus, the toolkit developed through Health Sense would
enable to modify, create and provide invisible and/or preventive services to citizens based on
evidence gather through complex data analysis/findings. The project will be implemented as a
predefined project because it requires the coordination between several public and private
actors, many of which have very specific knowledge in the project area. Without the successful
implementation of this project today, the push for combined evidence and data-led
improvement of human social and health wellbeing, will be delayed for years.
c) Objective, expected outcome(s) and list of outputs
Project activity streams:
1.1. Project management
1.2. Data collecting environment
1.3. Data storage with pseudonymization and obfuscation tools
1.4. Warehouse data structures and ETL process
1.5. Data Analysis and visualization environment for third parties (e.g. private sector, R&D
institutions)
1.6. Building data flows in cooperation with third parties (e.g. private sector, R&D institutions)
1.7. Analysis of legal regulations to foster the results of the project
For more detailed activities see timetable/milestone plan (e). For budget overview see sheet
accompanied with this document.
Expected outputs:
data collection environment from different sources (governmental and non-governmental)
data pseudonymization, obfuscation and long text extraction tools
partly encrypted data storage with encryption/decryption tools and methodology
data flows from runtime information system to data warehouse (built on needs of third
parties). Illustrated with more detail in Appendix 2 and 3.
user rights and consent management system
data analysis environment for third parties
Analysis of legal regulations to ensure project outcomes
data warehouse environment for Ministry of Social Affairs and other governmental
institutions (for reporting and analysis purposes)
Expected outcomes:
to create a data management platform for developing innovative solutions for healthcare
and welfare service providers to develop and experiment new innovative products and
services;
to encourage the emergence of new health, welfare and lifestyle businesses and data driven
business models;
to create a launch pad for new healthcare and welfare services for their emergence to the
market in cooperation with SMEs and start-ups;
to promote scientific thinking and provide new inputs for research, development and
innovation in SMEs and start-ups in the delivery of health and welfare services and educate
highly skilled workforce in cooperation with universities.
Expected
project
result
Indicator
Unit of
measure
ment
Source of
verification
Frequency
of reporting
Baseline
value
Baseline
year
Target
value
Health
Sense data
management
platform
developed
and
operating
Data analysis
procedures/too
ls in place and
documented
Binary
Documentation
available on
HWISC website,
software hosted
at HWISC or
state cloud
infrastructure
Semi-
annually No 2018 Yes
Data
collection and
publishing
procedures/too
ls in place and
documented
Binary
Documentation
available on
HWISC website,
software hosted
at HWISC or
state cloud
infrastructure
Semi-
annually No 2018 Yes
Data
collection, and
publishing
environment
architecture
and data
analysis
environment
architecture
developed and
published
Binary
Documentation
available on
HWISC website,
software hosted
at HWISC or
state cloud
infrastructure
Semi-
annually No 2018 Yes
Number of
data
mining/Artific
ial Intelligence
pilot projects
successfully
finished
Number
Documentation
outlining
projects and
results available
on HWISC
website
Semi-
annually 0 N/A 3
Number of
professional
staff trained
Number Attendance
sheets
Semi-
annually 0 N/A 10
Project sustainability
All results created during the project will be maintained by Health and Welfare Information
Systems Centre and Ministry of Social Affairs. All software created during the project will be
hosted and maintained by Health and Welfare Information Systems Centre. The necessary
resources to maintain and host results will be applied from the annual state budget of Estonia.
Intellectual property
Unless stipulated otherwise in the agreements between project promoter and project partners,
intellectual property rights of the results of the project shall be owned by the party generating
it. When results are generated jointly, it shall be jointly owned, unless the parties in question
agree on a different solution. The method of defining joint ownership shall be based on their
contributing efforts towards the result in shares proportionate to their scope of work/budget for
that result.
After completion of the project, project promoter shall have the non-exclusive, royalty-free
right to use, modify, copy, transfer or make derivative results of the project. The rights of the
project promoter shall not be limited with regard to certain rights or to the purpose, term,
territory, extent, manner or means of using the results of the project.
d) Information on the project promoter and project partner(s)
Ministry of Social Affairs is a governmental institution that operates in the field of
social security. For ministry have been set five strategic objectives - ensure people's
economic prosperity and their good work, ensure people's social coping and
development, support the well-being of children and families, promote people's
mutual care, equal opportunities and gender equality, and ensure people's long and
high-quality life. Ministry of Social Affairs emerges objectives through compiling
development plans for the fields being under control of ministry, as well as
organization-based development plans.
Ministry of Social Affairs as project promoter, will ensure seamless project
coordination.
Health and Welfare Information Systems Centre (HWISC) is info technology
competence centre of Ministry of Social Affairs. HWISC is involved in the
development, and management of ICT services in the health, social and labour fields
within the area of government of the Ministry of Social Affairs. HWISC is a
representative of the Ministry of Social Affairs in the „Health Sense“ project as the
project manager.
HWISC will take upon the leading role in most of the project activities including
procuring the necessary licensed software and hosting as well as designing the
technical architecture of components and maintaining the solutions developed
during Health Sense project. HWISC will assist in project coordination and in
organising meetings as well as in analysis of legal regulations to ensure the success
of the project.
Tallinn University of Technology (TalTech), the second largest university in
Estonia, is international university teaching the knowledge and skills necessary for
today’s international and competitive marketplace. TalTech is the top centre of
science in Estonia. With strong emphasis on internationalization, TalTech has a
strong multicultural student body, many international professors (11% foreign staff
members), great cooperation with the world's top universities (e.g. Stanford,
Technische Universität München, Del University of Technology and KTH Royal
Institute of Technology in Europe) and with international companies (e.g.,
Microsoft, ABB, IBM. etc.). There are over 30 fully accredited international degree
programmes (4 Bachelor programmes, 18 Master programmes and 10 PhD
programmes) that are available fully in English.
TalTech will develop the appropriate model for digital health care data that could
be used for data collection and storage in new generation Estonian Health
Information System with the feasibility to implement the same model in other large
scale Electronic Health Records (EHR). TalTech will develop the data model for
digital medical data capture and storage to achieve semantic interoperability and
develop universal continuity of care process standard.
University of Tartu (UT) is Estonia’s leading centre of research and training. It
preserves the culture of the Estonian people and spearheads the country's reputation
in research and provision of higher education. UT belongs to the top 1.2% of world's
best universities.
As Estonia's national university, UT stresses the importance of international co-
operation and partnerships with reputable research universities all over the world.
The robust research potential of the university is evidenced by the fact that the
University of Tartu has been invited to join the Coimbra Group, a prestigious club
of renowned research universities.
UT includes four faculties. To support and develop the professional competence of
its students and academic staff, the university has entered into bilateral co-operation
agreements with 79 partner institutions in 31 countries.
University of Tartu will undertake the development of obfuscation toolkit.
Helse West IKT and Western Norway University of Applied Sciences are
cooperating in building infrastructure for Intromat (https://intromat.no/), a project
on introducing e-health in mental health. As Intromat requires designing of
architecture, API-s, interfaces, pseudonimization/synonimization tools similar to the
aim of Health Sense proposal, then it provides an ample opportunity to build
synergies for both projects and future collaborations. Helse Vest IKT supplies all
IT services to specialized health services in the counties of Rogaland, Hordaland
and Sogn og Fjordane. Helse Vest customers include the public hospitals in Helse
Vest, and several private health service providers in the region. Both Helse Vest IKT
and Western Norway University of Applied Sciences have extensive experiences in
designing and building software architecture.
Bilateral partners will provide consultations and best practice exchange on the
following topics: warehousing architecture (e.g. component architecture, processes,
relations with other warehouses, ETL principles and relations with data providers,
standards), licensed components (database environment, ETL tools, analytical tools,
data virtualization environments) and developed tools (synonymization tools,
obfuscation tools, tools for long text extraction, data encryption/decryption). The
bilateral partnership is crucial to ensure, that solutions developed in Estonia are
state-of-the-art, internationally relevant and to gauge the potential for sharing
components with Norwegian counterparts.
e) Timetable / Milestone plan *)
Extensive timetable is also visualized in a separate excel sheet
Activity (see attached
timetable)
Activity
stream
Leader Timeframe
(week from
project
starting date)
Project kick-off: 1st February 2021 (or as soon as possible)
Staffing the project
team
1.1 Ministry of Social Affairs, Health and
Welfare Information Systems Centre
1-6
A communication
campaign and
negotiations to select
third party projects
1.1 Ministry of Social Affairs, Health and
Welfare Information Systems Centre
1-63
Building overall
system architecture
1.1 – 1.7 Health and Welfare Information
Systems Centre (incl. project
consortium*)
1-17
Analysis of legal
regulations to ensure
project success
1.7 Ministry of Social Affairs, Health and
Welfare Information Systems Centre
5-102
Selecting and
describing projects for
develompent with third
parties (private sector,
R&D institutions)
1.1, 1.5-1.6 Health and Welfare Information
Systems Centre
6-63
Building hardware
architecture
1.1 – 1.7 Health and Welfare Information
Systems Centre (incl. project
consortium*)
4-9
Describing the criteria
and restrictions for the
Initial software
components to be
procured (ETL, DW
database, NoSQL.
Encryption/decryption,
obfuscation,
pseudonymisation,
user permissions,
virtualization etc.
1.1 – 1.7 Health and Welfare Information
Systems Centre (incl. project
consortium*)
1-14
Installation of initial
hardware environment
to infrastructure
(probably Estonian
state cloud “Riigipilv”)
1.1 - 1.6 Health and Welfare Information
Systems Centre
8-11
Component selection,
installation, and testing
(Data collecting
environment – ETL,
BIW tools)
1.1, 1.4,
1.5
Health and Welfare Information
Systems Centre
9-14
Building virtual
working environment
for third parties (closed
environment for ETL,
data marts, and analyse
tools)
1.1, 1.5 -
1.6
Health and Welfare Information
Systems Centre
12-19
Tenders of licenced
tools
1.1 – 1.5 Health and Welfare Information
Systems Centre
9-16
Completing initial
environment (tender
result installations) –
1.1 – 1.5 Health and Welfare Information
Systems Centre
17-21
central DW and data
lake environment
Testing of
environment
1.1 – 1.5 Health and Welfare Information
Systems Centre
22-25
Description of initial
environment, user
manuals
1.1 – 1.5 Health and Welfare Information
Systems Centre
9-25
Development/detailing
of architecture
1.4 Project consortium* 5-75
Building BIW for IS-s 1.1 – 1.5 Health and Welfare Information
Systems Centre
26-90
Development of
logical data structures
for DW
1.4 Tallinn University of Technology 2-64
Building data flows
from BIW to central
DW (ETL)
1.1 - 1.5 Health and Welfare Information
Systems Centre
17-90
Development of user
rights environment
1.1 – 1.5 Health and Welfare Information
Systems Centre
22-34
API, REST etc.
interfaces to access
data
1.5 Health and Welfare Information
Systems Centre
40-60
Third party projects
testing the built
toolkits and
environment
1.1 - 1.6 Health and Welfare Information
Systems Centre
26-102
Development of tools
for collection of
aggregated data
1.5 - 1.6 Health and Welfare Information
Systems Centre
52-60
Environment for
publishing data sets
and statistical results
(Open Data)
1.5 Health and Welfare Information
Systems Centre
58-70
Development of
pseudonymisation
toolset
1.3 Health and Welfare Information
Systems Centre
9-47
Development of
obfuscation toolset
1.3 University of Tartu 9-97
Development of long
text extraction tool
1.3 Health and Welfare Information
Systems Centre
9-97
Meetings with partners
(in Estonia)
1.1 Health and Welfare Information
Systems Centre, Helse-West IKT,
Western Norway University of Applied
Sciences
6, 26, 46, 66,
96
Meetings with partners
(in Norway)
1.1 Helse-West IKT, Western Norway
University of Applied Sciences, Health
and Welfare Information Systems
Centre
16, 36, 56, 76,
86
Final descriptions of
environment, user
manuals
1.1 Health and Welfare Information
Systems Centre 90-100
Promotion of project
results
1.1 Health and Welfare Information
Systems Centre 95-102
End of project: 31st January 2023
*Project consortium includes project promoter and all project partners (incl. donor partners).
f) Budget
Included in separate Excel sheet.
g) Overview of risks:
1. Legal frame obstacles to be followed in order to merge the different datasets.
a. Probability: Likely
b. Impact: Moderate
c. Response: Development of legal framework (incl. revising current regulations)
will go in strong cooperation with the project team and project objectives.
Revising regulations is part of not only major, but also minor e-government
initiatives in Estonia. This is done regularly, routinely and simultaneously for
all new governmental ICT-related initiatives as well as for minor modifications
in existing digital infrastructure.
2. Breech of principles and laws regarding privacy, data safety and ethics.
a. Probability: Unlikely
b. Impact: Major
c. Response: Apply strict data security measures and methods throughout data
storage and transfer infrastructure. Provide third-party access to only
pseudonymized data only within the secure environment with access to
analytical tools. Log all actions, which are done with the data in the secure
environment. Allow only aggregated/analysed data to be exported out of the
secure environment after logs have been checked for any suspicions. Additional
principles regarding data privacy and trust to minimize this risk are detailed in
Appendix 1.
3. Procurements for hardware and/or software fail or will be delayed that leads to difficulty
to support requested activities.
a. Probability: Unlikely
b. Impact: Major
c. Response: Thorough preparation of the procurement documents
4. Lack of interest from SMEs and/or academia that leads to underuse of the Health sense
capability.
a. Probability: Unlikely
b. Impact: Moderate
c. Response: Engage additional entities to promote the capability. Provide
additional operational support from governmental agencies (e.g. datasets that
can be used to solve specific problems).
5. Reputation damage to the project owner and project partners
a. Probability: Unlikely
b. Impact: Minor
c. Response: Carefully plan, prepare and staff the project before the official start
to mitigate planning fallacies. Carefully select partners based on their showcased
skills, interest, past commitments and adherence to data privacy and ethical
principles.
6. Postponement of welfare technology open call projects
a. Probability: Likely
b. Impact: Moderate
c. Response: Include also projects/partners with reliable funding outside of welfare
technology open call in addition to the open call projects.
APPENDIX 1 – Privacy and trust requirements and related responses
1. Requirements
a. The results of the project require the application of high-level data protection and sensitivity
rules to prevent data misuse and privacy breaches.
b. All data processing activities must be verifiable at a later stage.
c. Data processing must take place on the basis of legislation.
d. Only deal with ethical and technically capable partners who can provide a secure data storage
environment and trusted team.
2. Responses
a. Data storages are divided to two securely separated areas: data owner area and researchers
area; personalized data can be stored only at the data owner area; at the researchers area data
can be stored in pseudonymized and aggregated manner; pseudonymized and aggregated
data can also be stored at the data owner area. (requirement a)
b. Data owner area is also divided to two separated areas: personalized data area and
impersonalized data area. This allows better to separate users who need personal information
from users who do not need them. (requirement a)
c. Access to the personal and pseudonymized data can only be done through secure
environments using highest-level authorization tools (corresponding to EIDAS “high”).
(requirement a)
d. Each dataset must be compiled using the different pseudonym for the same person.
(requirement a)
e. Along with data pseudonymizing, obfuscation is always applied. (requirement a)
f. “Aggregated data” is in most cases the synonym of “open data”; however, this is only
possible if a sufficient amount of data is aggregated on one line; the minimum number of
aggregated rows must be defined for each data set (requirement a)
g. It is mandatory to create isolated sandbox-like environments where researchers can analyse
(anonymized or aggregated) data; only aggregated (statistical) data can be extracted from
these environments. (requirement a)
h. All activities with the data must be stored in logs; it is necessary to build a log analysis
environment to detect misuse of data. (requirement b)
i. At the first stages of the project, it is necessary to find solutions for the creation of data
processing activities in accordance with current legislation; at the same time, it is necessary
to identify regulatory shortcomings that prevent data processing in the interests of
individuals and initiate changes to these laws. (requirement c)
j. The background, intent and goals of all partners must be verified every time when data usage
permission is granted; all data usage is monitored on the basis of log analysis; when the
misuse of data is detected, the misusers accounts will be closed until the decision is made
(requirement e)
APPENDIX 2 – Health Sense overall component architecture