Dokumendiregister | Transpordiamet |
Viit | 6.1-3/24/14172-2 |
Registreeritud | 16.08.2024 |
Sünkroonitud | 19.08.2024 |
Liik | Valjaminev kiri |
Funktsioon | 6.1 Navigatsiooni korraldamine |
Sari | 6.1-3 Kirjavahetus navigatsiooniteabe küsimustes |
Toimik | 6.1-3/2024 |
Juurdepääsupiirang | Avalik |
Juurdepääsupiirang | |
Adressaat | Fraunhofer Institute for Wind Energy Systems IWES |
Saabumis/saatmisviis | Fraunhofer Institute for Wind Energy Systems IWES |
Vastutaja | Tiit Palgi (Users, Merendusteenistus, Laevateede ja sadamate osakond, Laevateede üksus) |
Originaal | Ava uues aknas |
From: Tiit Palgi (Estonian Transport Administration) <[email protected]>
Sent: Fri, 16 Aug 2024 08:31:52 +0000
To: Zwick, Sarah <[email protected]>; Kaspar Anderson <[email protected]>
Subject: Vs: Permitprocess for AIS and deployment of an ODAS buoy
Dear Sarah Zwick
At first for scientific studies at Estonian territorial waters and exclusive economic zone (EEZ) research permit is needed. More information about that permit is available at following address: https://kliimaministeerium.ee/en/water-forest-resources/protection-marine-environment/marine-research-permit
In this permit is described conditions and requirements for conducted research. The application for scientific studies permit should be sent at least six months before start of the study.
For Estonian companies above mentioned permit is not required.
For installation a buoy a permit is needed issued by us (see maritime safety act § 47 (43)). For permit we need information about buoy location (WGS84 coordinates), dates when the buoy is installed, what kind of the buoy it is (it should be yellow special mark according IALA Maritime buoyage system), is it equipped with lantern and lantern’s flash characteristics. If the buoy is equipped with registered AIS transponder we need to know it’s MMSI and broadcasted name. If you have some additional requirement’s concerning buoy (for instance requirement for ships to keep clearance for some meters) please add this information to the application. The information is used to issue navigational warning to mariners and assess collision risk with vessels. The application for buoy installation should be sent at least one month before the installation to the following address: [email protected]
If you have any further questions please don’t hesitate to ask.
Best regards
Tiit Palgi
Chief Specialist
Waterways and Ports Department
Maritime Division
Transport Administration
Mobile: +372 5243 875
www.transpordiamet.ee
Saatja: Zwick, Sarah <[email protected]>
Saatmisaeg: neljapäev, 15. august 2024 16:37
Adressaat: Kaspar Anderson <[email protected]>
Koopia: Tiit Palgi (Estonian Transport Administration) <[email protected]>
Teema: AW: Permitprocess for AIS and deployment of an ODAS buoy
Hi Kaspar,
thanks a lot for providing the link.
I had a look on this, and I am not sure, if this is the “right one” for what we are planning to do.
We would like to deploy the buoy for several month at a specific offshore position.
Or is it the chapter 5. In the linked document, which we must fill out?
Did I understand it correct, that we must hand in this request for a permit 6 month before the buoy-deployment?
BR,
Sarah
Sarah Zwick
Gruppenleiterin Windmesskampagne
Abteilung Windmessung und -charakterisierung
Fraunhofer-Institut für Windenergiesysteme IWES
Am Seedeich 45, 27572 Bremerhaven
Von: Kaspar Anderson <[email protected]>
Gesendet: Donnerstag, 15. August 2024 15:15
An: Zwick, Sarah <[email protected]>
Cc: Tiit Palgi <[email protected]>
Betreff: RE: Permitprocess for AIS and deployment of an ODAS buoy
Hello,
You can find all the relevant information about the permit here:
I am happy to help if you have any further questions.
With regards
Kaspar Anderson
Nõunik | Merendusosakond
Counsellor | Maritime Department
+372 6262 990 | [email protected] | http://www.kliimaministeerium.ee/
Kliimaministeerium | Ministry of the Climate of Estonia | Suur-Ameerika 1, 10122 Tallinn, Eesti
From: Zwick, Sarah <[email protected]>
Sent: Thursday, August 15, 2024 3:55 PM
To: Tiit Palgi <[email protected]>
Cc: Kaspar Anderson <[email protected]>
Subject: AW: Permitprocess for AIS and deployment of an ODAS buoy
Dear Tiit Palgi,
thanks a lot for your response. I am happy to answer your questions:
At the moment we are only looking about some information about how the process of getting a permit is working and which timeline is behind this.
Currently we are involved in some Estonian tenders and if we win one of those, it is our obligation to obtain the permit within short time.
Do you need any further information?
BR,
Sarah
Sarah Zwick
Group Manager Wind Measurement Campaign Operations
Department Wind Measurement and Characterization
Fraunhofer Institute for Wind Energy Systems IWES
Am Seedeich 45, 27572 Bremerhaven, Germany
Von: Tiit Palgi (Estonian Transport Administration) <[email protected]>
Gesendet: Donnerstag, 15. August 2024 14:01
An: Zwick, Sarah <[email protected]>
Cc: Kaspar Anderson <[email protected]>
Betreff: Vs: Permitprocess for AIS and deployment of an ODAS buoy
Dear Sarah Zwick,
To answer your question I need a bit more information:
1) could you please send more detailed information what parameters will be measured?
2) what ship is going to install the buoy – is it your own ship or is it done in cooperation with some company in Estonia?
Best regards
Tiit Palgi
Chief Specialist
Waterways and Ports Department
Maritime Division
Mobile: +372 5243 875
www.transpordiamet.ee
Saatja: Zwick, Sarah <[email protected]>
Saatmisaeg: kolmapäev, 14. august 2024 11:36
Adressaat: [email protected]
Teema: Permitprocess for AIS and deployment of an ODAS buoy
Dear Transport-Administration Team,
I am looking for some information (process and point of contact) about the two following topics:
Maybe you can guide me to the right point of contact within your team?
If you require some more details, please let me know.
Thanks a lot for your support and have a nice day.
Best regards,
Sarah Zwick
Group Manager Wind Measurement Campaign Operations
Department Wind Measurement and Characterization
Fraunhofer Institute for Wind Energy Systems IWES
Am Seedeich 45, 27572 Bremerhaven, Germany
Website | Blog | YouTube | LinkedIN | XING
Nimi | K.p. | Δ | Viit | Tüüp | Org | Osapooled |
---|---|---|---|---|---|---|
Küsimus Eesti vetes poide paigaldamise kohta | 15.08.2024 | 4 | 6.1-3/24/14172-1 | Sissetulev kiri | transpordiamet | Fraunhofer Institute for Wind Energy Systems IWES |